REKAPITULASI ANGGARAN BIAYA

INSTANSI : DINAS PERINDUSTRIAN, PERDAGANGAN, KOPERASI, DAN UKM


PEKERJAAN : JASA KONSULTAN PERENCANAAN PEMBANGUNAN GEDUNG SISTEM RESI GUDANG (SRG)
LOKASI : DESA NAMANG, KEC. NAMANG, KAB. BANGKA TENGAH
TAHUN : 2020

No URAIAN PEKERJAAN JUMLAH HARGA

1 0 .= Rp. 2,941,834,045.67

2 #NAME? .= Rp. #NAME?

3 #REF! .= Rp. #REF!

4 #REF! .= Rp. #REF!

5 #REF! .= Rp. #REF!

6 #REF! .= Rp. #REF!

7 #REF! .= Rp. #REF!

8 #REF! .= Rp. #REF!

JUMLAH TOTAL #REF!

Jumlah Total = Rp. #REF!


PPN 10 % = Rp. #REF!
Jumlah = Rp. #REF!
Dibulatkan = Rp. #REF!

Terbilang :

Pangkalpinang, 29 Maret 2020

DIBUAT OLEH :
KONSULTAN PERENCANA
CV. LEMBAGA KONSULTANINDO

M. ZULFAN SAPUTRA, S.T.


Direktur
TIME SCH
PELAKSANAAN PEMBANGU
UNIVERSITAS BANGK

NO. URAIAN PEKERJAAN SAT VOL

I #NAME?
A #NAME?
1 #NAME? #NAME? #NAME?
2 #NAME? #NAME? #NAME?
4 #NAME? #NAME? #NAME?

II #NAME?
A #NAME?
1 #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
2 #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
B #NAME?
1 #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
2 #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
3 #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
4 #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
5 #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
6 #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
C #NAME?
1 #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
2 #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
D #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
E #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
F #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?

III #NAME?
III.1 #NAME?
A #NAME?
I Pekerjaan Dinding
1 #NAME? #NAME? #NAME?
2 Pek. Pas. Dinding bata merah 1/2 bata, 1 pc : 4 psr, untuk dinding M2 1609.20
3 #NAME? #NAME? #NAME?
4 #NAME? #NAME? #NAME?
5 Pek. Plesteran 1 pc : 4 psr M2 3218.40
6 Pek. Acian Beton M2 509.00
7 #NAME? #NAME? #NAME?
8 #NAME? #NAME? #NAME?
9 #NAME? #NAME? #NAME?
10 #NAME? #NAME? #NAME?
11 #NAME? #NAME? #NAME?
12 #NAME? #NAME? #NAME?
13 #NAME? #NAME? #NAME?
14 #NAME? #NAME? #NAME?
15 #NAME? #NAME? #NAME?
II #NAME?
1 #NAME? #NAME? #NAME?
2 #NAME? #NAME? #NAME?
3 #NAME? #NAME? #NAME?
III #NAME?
1 #NAME? m2 #NAME?
2 #NAME? #NAME? #NAME?
3 #NAME? m2 #NAME?
4 #NAME? m2 #NAME?
5 #NAME? m2 #NAME?
6 #NAME? m2 #NAME?
IV Pekerjaan Kusen
1 Pek. Jendela J1 Unit 14.0
2 #NAME? #NAME? #NAME?
3 #NAME? #NAME? #NAME?
4 #NAME? #NAME? #NAME?
5 #NAME? #NAME? #NAME?
6 #NAME? #NAME? #NAME?
7 #NAME? #NAME? #NAME?
8 #NAME? #NAME? #NAME?
9 #NAME? #NAME? #NAME?
10 #NAME? #NAME? #NAME?
11 #NAME? #NAME? #NAME?
12 #NAME? #NAME? #NAME?
V Pekerjaan Pengecatan
1 Pek. Pengecatan dinding M2 3218.4
2 #NAME? #NAME? #NAME?
3 #NAME? #NAME? #NAME?
4 #NAME? #NAME? #NAME?
5 #NAME? #NAME? #NAME?
6 Pek. Pengecatan beton ekspose M2 509.0
VI #NAME?
1 #NAME? #NAME? #NAME?
2 #NAME? #NAME? #NAME?
3 #NAME? #NAME? #NAME?
4 #NAME? #NAME? #NAME?
5 #NAME? #NAME? #NAME?
6 #NAME? #NAME? #NAME?
7 #NAME? #NAME? #NAME?
VII Pekerjaan Atap
1 Pek. Pas. Rangka Atap Baja Ringan M2 297
B #NAME?
I #NAME?
1 #NAME? #NAME? #NAME?
2 #NAME? #NAME? #NAME?
3 #NAME? #NAME? #NAME?
4 #NAME? #NAME? #NAME?
5 #NAME? #NAME? #NAME?
6 #NAME? #NAME? #NAME?
7 #NAME? #NAME? #NAME?
8 #NAME? #NAME? #NAME?
9 #NAME? #NAME? #NAME?
10 #NAME? #NAME? #NAME?
11 #NAME? #NAME? #NAME?
12 #NAME? #NAME? #NAME?
13 #NAME? #NAME? #NAME?
14 #NAME? #NAME? #NAME?
15 #NAME? #NAME? #NAME?
16 #NAME? #NAME? #NAME?
II #NAME?
1 #NAME? #NAME? #NAME?
2 #NAME? #NAME? #NAME?
3 #NAME? #NAME? #NAME?
4 #NAME? #NAME? #NAME?
III #NAME?
1 #NAME? #NAME? #NAME?
2 #NAME? #NAME? #NAME?
3 #NAME? #NAME? #NAME?
4 #NAME? #NAME? #NAME?
IV #NAME?
1 #NAME? #NAME? #NAME?
2 #NAME? #NAME? #NAME?
3 #NAME? #NAME? #NAME?
4 #NAME? #NAME? #NAME?
5 #NAME? #NAME? #NAME?
6 #NAME? #NAME? #NAME?
V #NAME?
1 #NAME? #NAME? #NAME?
2 #NAME? #NAME? #NAME?
3 #NAME? #NAME? #NAME?
4 #NAME? #NAME? #NAME?
5 #NAME? #NAME? #NAME?
6 #NAME? #NAME? #NAME?
7 #NAME? #NAME? #NAME?
VI #NAME?
1 #NAME? #NAME? #NAME?
2 #NAME? #NAME? #NAME?
3 #NAME? #NAME? #NAME?
4 #NAME? #NAME? #NAME?
5 #NAME? #NAME? #NAME?
6 #NAME? #NAME? #NAME?
C #NAME?
I #NAME?
1 #NAME? #NAME? #NAME?
2 #NAME? #NAME? #NAME?
3 #NAME? #NAME? #NAME?
4 #NAME? #NAME? #NAME?
5 #NAME? #NAME? #NAME?
6 #NAME? #NAME? #NAME?
7 #NAME? #NAME? #NAME?
8 #NAME? #NAME? #NAME?
9 #NAME? #NAME? #NAME?
10 #NAME? #NAME? #NAME?
11 #NAME? #NAME? #NAME?
12 #NAME? #NAME? #NAME?
13 #NAME? #NAME? #NAME?
14 #NAME? #NAME? #NAME?
15 #NAME? #NAME? #NAME?
II #NAME?
1 #NAME? #NAME? #NAME?
2 #NAME? #NAME? #NAME?
3 #NAME? #NAME? #NAME?
III #NAME?
1 #NAME? #NAME? #NAME?
2 #NAME? #NAME? #NAME?
3 #NAME? #NAME? #NAME?
4 #NAME? #NAME? #NAME?
5 #NAME? #NAME? #NAME?
IV #NAME?
1 #NAME? #NAME? #NAME?
2 #NAME? #NAME? #NAME?
3 #NAME? #NAME? #NAME?
4 #NAME? #NAME? #NAME?
5 #NAME? #NAME? #NAME?
6 #NAME? #NAME? #NAME?
7 #NAME? #NAME? #NAME?
8 #NAME? #NAME? #NAME?
9 #NAME? #NAME? #NAME?
10 #NAME? #NAME? #NAME?
11 #NAME? #NAME? #NAME?
12 #NAME? #NAME? #NAME?
V #NAME?
1 #NAME? #NAME? #NAME?
2 #NAME? #NAME? #NAME?
3 #NAME? #NAME? #NAME?
4 #NAME? #NAME? #NAME?
5 #NAME? #NAME? #NAME?
6 #NAME? #NAME? #NAME?
7 #NAME? #NAME? #NAME?
VI #NAME?
1 #NAME? #NAME? #NAME?
2 #NAME? #NAME? #NAME?
3 #NAME? #NAME? #NAME?
4 #NAME? #NAME? #NAME?
5 #NAME? #NAME? #NAME?
6 #NAME? #NAME? #NAME?
7 #NAME? #NAME? #NAME?
8 #NAME? #NAME? #NAME?
VII #NAME?
1 #NAME? #NAME? #NAME?
### #NAME?
I #NAME?
1 #NAME? #NAME? #NAME?
2 #NAME? #NAME? #NAME?
3 #NAME? #NAME? #NAME?
4 #NAME? #NAME? #NAME?
5 #NAME? #NAME? #NAME?
6 #NAME? #NAME? #NAME?
II #NAME?
1 #NAME? #NAME? #NAME?
III #NAME?
1 #NAME? #NAME? #NAME?
2 #NAME? #NAME? #NAME?
IV #NAME?
1 #NAME? #NAME? #NAME?

III.2 #NAME?
A #NAME?
I #NAME?
1 #NAME? #NAME? #NAME?
2 #NAME? #NAME? #NAME?
3 #NAME? #NAME? #NAME?
4 #NAME? #NAME? #NAME?
5 #NAME? #NAME? #NAME?
6 #NAME? #NAME? #NAME?
II #NAME?
1 #NAME? #NAME? #NAME?
2 #NAME? #NAME? #NAME?
3 #NAME? #NAME? #NAME?
4 #NAME? #NAME? #NAME?
5 #NAME? #NAME? #NAME?
III #NAME?
1 #NAME? #NAME? #NAME?
IV #NAME?
1 #NAME? #NAME? #NAME?
V #NAME?
1 #NAME? #NAME? #NAME?

#NAME? #NAME?
### #NAME?
1 #NAME? #NAME? #NAME?
2 #NAME? #NAME? #NAME?
3 #NAME? #NAME? #NAME?
4 #NAME? #NAME? #NAME?
### #NAME?
1 #NAME? #NAME? #NAME?
2 #NAME? #NAME? #NAME?
3 #NAME? #NAME? #NAME?
4 #NAME? #NAME? #NAME?

V PEKERJAAN MEKANIKAL & ELEKTRIKAL


### #REF!
I #REF!
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
4 #REF! #REF! #REF!
5 #REF! #REF! #REF!
6 #REF! #REF! #REF!
7 #REF! #REF! #REF!
8 #REF! #REF! #REF!
9 #REF! #REF! #REF!
10 #REF! #REF! #REF!
11 #REF! #REF! #REF!
### #REF!
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
4 #REF! #REF! #REF!
5 #REF! #REF! #REF!
6 #REF! #REF! #REF!
7 #REF! #REF! #REF!
8 #REF! #REF! #REF!
9 #REF! #REF! #REF!
10 #REF! #REF! #REF!
11 #REF! #REF! #REF!
### #REF!
### #REF! #REF! #REF!
### #REF! #REF! #REF!
### #REF! #REF! #REF!
B. #REF!
I #REF!
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
II #REF!
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
III #REF!
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
C. #REF!
I #REF!
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
II #REF!
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
D. #REF!
I #REF!
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
II #REF!
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
E. #REF!
I #REF!
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
II #REF!
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
F. #REF!
I #REF!
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
4 #REF! #REF! #REF!
5 #REF! #REF! #REF!
6 #REF! #REF! #REF!
II #REF!
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
4 #REF! #REF! #REF!
5 #REF! #REF! #REF!
6 #REF! #REF! #REF!
III #REF!
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
4 #REF! #REF! #REF!
5 #REF! #REF! #REF!
6 #REF! #REF! #REF!
IV #REF!
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
4 #REF! #REF! #REF!
5 #REF! #REF! #REF!
6 #REF! #REF! #REF!
G. #REF!
I #REF!
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
4 #REF! #REF! #REF!
II #REF!
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
4 #REF! #REF! #REF!
III #REF!
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
4 #REF! #REF! #REF!
H. #REF!
I #REF!
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
4 #REF! #REF! #REF!
II #REF!
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
4 #REF! #REF! #REF!
III #REF!
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
4 #REF! #REF! #REF!
IV #REF!
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
4 #REF! #REF! #REF!
5 #REF! #REF! #REF!
I. #REF!
I
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
4 #REF! #REF! #REF!
I. #REF!
I
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!

TOTAL JUMLAH

PROGRESS PELAKSANA
KOMULATIF PROGRESS PELAKSANA
TIME SCHEDULE
NAAN PEMBANGUNAN GEDUNG REKTORAT
ERSITAS BANGKA BELITUNG

BOBOT KONTROL BULAN


RENCAN BOBOT
Harga/Item JUMLAH HARGA A RENCANA MINGGU 1
% % HARI 1 2 3 4

#NAME? #NAME? #NAME? #NAME?


#NAME? #NAME? #NAME? ### ### ### ###
#NAME? #NAME? #NAME? ### ###
#NAME? #NAME? #NAME? ### ###

#NAME? #NAME? #NAME? #NAME?


#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? ###
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? ###
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?

#NAME? #NAME? #NAME? #NAME?


#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? 0.00
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?

#NAME? #NAME? #NAME? #NAME?


#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?

#NAME? Rp 548,555,983 #REF! #NAME?


#NAME? #NAME? #NAME?
Rp 260,048,329 #REF! #REF!
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
Rp 261,930,321 #REF! #REF!
Rp 26,577,333 #REF! #REF!
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? Rp 160,500,000 #REF! #REF!
Rp 98,000,000 #REF! #REF!
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? Rp 179,678,672 #REF! #REF!
Rp 155,142,415 #REF! #REF!
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
Rp 24,536,257 #REF! #REF!
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
Rp 68,458,500 Rp 73,041,702 #REF! #REF!
Rp 68,458,500 #REF! #REF!

#NAME? #NAME? #NAME? #NAME?


#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?

#NAME? #NAME? #NAME? #NAME?


#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?

#NAME? #NAME? #NAME? #NAME?


#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?

#NAME? #NAME? #NAME? #NAME?


#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?

#NAME? #NAME? #NAME? #NAME?


#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?

#REF! #REF! #REF! #REF!


#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!

#REF! #REF! #REF! #REF!


#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!

#REF! #REF! #REF! #REF!


#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! 0.00

Rp 2,391,498 #REF! #REF! #REF!


#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!

#REF! #REF! #REF! #REF!


#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF!

#REF! #REF! #REF! #REF!


#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF!

#REF! #REF! #REF! #REF!


#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!

#REF! #REF! #REF! #REF!


#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!

#REF! #NAME?

#REF! 0 #REF! #REF! #REF! #REF!


0 #REF! #REF! #REF! #REF!
1
1 2 3
5 6 7 8 9 10 11 12 13 14 15 16 17 18

###
### ### ###

###
### ### ### ### ### ### ###
### ### ### ### ### ###

###
### ### ###
### ### ###

###

###
###

###

###
###

###

###
### #NAME? ###
###
### ### ### ###
### ### ###

###
#REF! #REF! #REF! #REF! #REF!
### ###

### #NAME?
### #NAME?
### #NAME?
#REF!

#REF!

#REF!
#REF!

#REF! #REF! #REF!

#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF! #REF! #REF! #REF! ### #REF! ### ### ### #REF! #REF! ### #NAME? #REF!
#REF! #REF! #REF! #REF! ### #REF! ### ### ### #REF! #REF! ### #NAME? #REF!
3 4 5
19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

###

###

###
### ### ### ### ### ### ### ### ### ### ### ###
#NAME? ### ### ### ### ### ### ### ### ### ### ###

###
### ### ### ### ### ### ### ### ### ### ###
#NAME? ### ### ### ### ### ### ### ###

###
#NAME? ### ### ### ### ### ### ### ### ### ### ###
#NAME? ### ### ### ### ### ### ### ###

###
#NAME? ### ### ### ### ### ### ### ### ### ###
#NAME? ### ### ### ### ### ###

###
#NAME? ### ### ### ### ### ### ### ### ### ###
#NAME? ### ### ###

###
#NAME? ### ### ### ### ### ### ### ### ### ###
#NAME? ### ### ### ###

#NAME? ### ### ### ### ### ### ### ### ### ###
#NAME? ### ### ### ### ### ### ### ###

###
### ### ### ### ### ### ### ### ### ### ### ###
#NAME? ### ### ### ### ### ### ### ### ### ### ###

###
### ###

###
### ###
###
###
###
### ###
### ###
### ###
###

#REF! #REF! #REF! #REF!


### ###
#NAME?
#REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
### ###

###
###
###
### ### ###
### ### ###
### ### ###

#REF!
### ### ### ###

###

###
#REF!
#REF! #REF!
#REF!
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF!

#REF! #REF!

#NAME? #REF! ### #REF! #REF! #REF! #REF! #REF! #REF! #REF! ### #REF! #REF! #REF! #REF! #REF! #REF!
#NAME? #REF! ### #REF! #REF! #REF! #REF! #REF! #REF! #REF! ### #REF! #REF! #REF! #REF! #REF! #REF!
2
6 7 8
36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52

### ###

### ###
### ###

###

###

### ### ###


###

###

###
### ###
###
###
###
###
### ###
### ###
### ###
###

###
### ###
###
###
###
###
###
###
###
###

### ### ### ### ### ###


### ### ### ###
### ### ### ### ### ###

### ### ###


### ### ### ### ### ### ###
### ### ### ### ###

#REF!
### ### ### ### ###
### ### ### ### ###
#REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
### ### #REF! ### ### #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! ### ### ###
### ### #REF! ### ### #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! ### ### ###
8 9 10
53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69
### ### ### ### ###
### ### ###
### ### ### ### ### ### ###
### ### ### ###
### ###

### ### ###

### ### ### ###


### ### ### ### ### ###
### ### ###
#REF! #REF!
###
### ### ### ### ### ### ###
### ### ### ###
### ###
### ### ###
### ### ### ###
### ### ### ### ### ### ###
### ###
### ###
###
###

###

### ### ### ###


### ### ###
### ###
### ###
###
###
###
### ### ###
### ### ###

### ###
###
###
### ### ###
### ### ### ### ###
### ### ### ### ###
### ###
### ### ###
### ###
### ### ### ### ###
### ### ### ###
### ### ### ###
### ###
### ### ### ###

### ### ### ### ###


### ### ### ###
### ### ###
###
###

### ### ###

###
### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
3
11 12 13
70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86
###
###

#REF! #REF! #REF! #REF!


###

### ### ###

### ### ### ### ### ###


### ### ### ### ###
### ### ### ### ###
### ### ###
### ### ###
###
###
###
### ### ### ###
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF!

#REF! #REF! #REF!


#REF! #REF! #REF!
#REF! #REF!

#REF!
#REF!
#REF!

#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
0.00

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

#REF! #REF! #REF!


#REF!
#REF!
#REF!

### ### ### ### #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! ### ###
### ### ### ### #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! ### ###
4
13 14 15
87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103
###
### ###
### ### ### ### ###
### ### ###

### ### ### ### ###


###
### ### ### ### ### ### ###
###
###
###
###
###

###
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
### ### #REF! #REF! ### ### ### ### ### ### ### ### ### ### ### ### ###
### ### #REF! #REF! ### ### ### ### ### ### ### ### ### ### ### ### ###
4
15 16 17 18
104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120
###
### ### ### ###

###
###
###
###
###
###
###

### ###
###
###
###
###
###
###
### ###
###
###
### ###
###
###
###
###
### ### ###

###

### ###
###

### ###
#REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! ### ### ### ### ### ### ###
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! ### ### ### ### ### ### ###
5
18 19 20
121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137
###
### ###
###
###
###
### ###
###
###
###
###
###

###
###

###
###
###

### ### ### ### ### ###


###
###

###
###
###
###
###
###
###
###

###
###
###
### ### ### ###
### ### ###
###
### ### ### ###
### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
5
20 21 22
138 139 140 141 142 143 144 145 146 147 148 149 150
### ###
### ### ### ###
### ### ###
#NAME?

###
### ###

###
### ###
###
### ### ###
### ### ###

### ###
### ###

### ###

### ### ### ###


### ###
### ### ### ### ### ###
### ###

### ### ### ### ### #NAME?


### ### ### ### ### #NAME?
#NAME?
### #NAME? #NAME?
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!

### ### ### ### ### ### ### ### #NAME? #REF! #REF! #REF! #REF!
### ### ### ### ### ### ### ### #NAME? #REF! #REF! #REF! #REF!
EESTIMATE ENGINEERING

INSTANSI -
PEKERJAAN -
LOKASI -
TAHUN : 2020

No URAIAN PEKERJAAN KODE SAT VOLUME HARGA SATUAN JUMLAH

JUMLAH Rp 2,941,834,045.67

I Pekerjaan Persiapan
1 Pek. Pembersihan Lapangan & Perataan A. 2.2.1.9 M2 750.00 Rp 25,217.50 Rp 18,913,125.00
2 Pek. Gudang Bahan & Alat A. 2.2.1.7 M2 12.00 Rp 1,010,135.50 Rp 12,121,626.00
3 Papan Proyek, Pengadaan K3 & Rambu - Rambu ASM. Ls 1.00 Rp 3,000,000.00 Rp 3,000,000.00
4 Pek. Pas. Bowplank A. 2.2.1.4 M3 110.00 Rp 146,640.18 Rp 16,130,419.25
subjumlah : Rp 50,165,170.25

II Pekerjaan Tanah
1 Pek. Galian Tanah A.2.3.1.2 M3 143.50 Rp 124,982.55 Rp 17,934,995.93
2 Pek. Tanah Timbunan A.2.3.1.11 M3 150.00 Rp 106,401.90 Rp 15,960,285.00
3 Pek. Urugan Tanah Kembali A.2.3.1.9 M3 47.83 Rp 75,729.50 Rp 3,622,394.42
subjumlah : Rp 37,517,675.34

III Pekerjaan Pondasi


1 Pek. Pondasi Beton A.4.1.1.28 M3 57.75 Rp 4,518,755.23 Rp 260,958,114.53
2 Pek. Sloof Beton 25 x 40 cm A.4.1.1.29 M3 26.00 Rp 5,476,193.14 Rp 142,381,021.64
3 Pek. Pas. Batu Belah 1SP : 4PP A.3.2.1.2 M3 7.88 Rp 1,193,794.25 Rp 9,401,129.72
4 Pek. Pasir Urug A.2.3.1.11 M3 120.00 Rp 106,401.90 Rp 12,768,228.00
subjumlah : Rp 425,508,493.89

IV Pekerjaan Struktur
1 Pek. Kolom A.4.1.1.32 M3 119.30 Rp 5,829,020.45 Rp 695,402,139.69
2 Pek. Balok A.4.1.1.31 M3 26.00 Rp 6,643,548.89 Rp 172,732,271.14
3 Pek. Plat Atap A.4.1.1.34 M3 48.00 Rp 6,260,493.14 Rp 300,503,670.72
4 Pek. Kubah A.4.1.1.34 M3 6.73 Rp 6,260,493.14 Rp 42,145,639.82
subjumlah : Rp 1,210,783,721.36

V Pekerjaan Lantai
1 Pek. Keramik 60 x 60 DH.12.2 M2 396.00 Rp 302,265.81 Rp 119,697,260.76
2 Pek. Keramik 20 x 20 DH.12.1 M2 72.00 Rp 268,970.90 Rp 19,365,904.80
subjumlah : Rp 139,063,165.56

VI Pekerjaan Dinding
1 Pek. Pas. Dinding bata merah 1/2 bata, 1 pc : 4 psr, untuk dinding DH.2.2 M2 1609.20 Rp 161,601.00 Rp 260,048,329.20
2 Pek. Plesteran 1 pc : 4 psr A. 4.4.2.4 M2 3218.40 Rp 81,385.26 Rp 261,930,320.78
3 Pek. Acian Beton A. 4.4.2.27 M2 509.00 Rp 52,214.80 Rp 26,577,333.20
4 Pek. Pas. Dinding GRC + Pengecatan D,H, M2 25.74 Rp 800,000.00 Rp 20,592,000.00
subjumlah : Rp 548,555,983.18

VII Pekerjaan Kusen


1 Pek. Jendela J1 D.H. Unit 14.00 Rp 7,000,000.00 Rp 98,000,000.00
2 Pek. Jendela J2 D.H. Unit 2.00 Rp 3,500,000.00 Rp 7,000,000.00
3 Pek. Pintu P1 D.H. Unit 2.00 Rp 7,500,000.00 Rp 15,000,000.00
4 Pek. Pintu P2 D.H. Unit 9.00 Rp 4,500,000.00 Rp 40,500,000.00
subjumlah : Rp 160,500,000.00

VIII Pekerjaan Pengecatan


1 Pek. Pengecatan dinding A. 4.7.1.10 M2 3218.40 Rp 48,204.83 Rp 155,142,415.22
2 Pek. Pengecatan beton ekspose A. 4.7.1.10 M2 509.00 Rp 48,204.83 Rp 24,536,256.94
subjumlah : Rp 179,678,672.16

IX Pekerjaan Atap
1 Pek. Pas. Rangka Atap Baja Ringan HSBU M2 297.00 Rp 230,500.00 Rp 68,458,500.00
5 Pek. Pas. Bubungan Alumunium DH.4.2 M' 37.85 Rp 121,088.55 Rp 4,583,201.62
subjumlah : Rp 73,041,701.62

X Pekerjaan Listrik
1 Pek. Pas. Instalasi Lampu & Saklar DH.15.1 TTK 25.00 Rp 171,474.16 Rp 4,286,854.00
2 Pek. Pas. Lampu TL LED 2x18 DH.15.2 SET 15.00 Rp 352,000.00 Rp 5,280,000.00
3 Pek. Pas. Saklar Tunggal DH.15.4 BH 5.00 Rp 26,301.00 Rp 131,505.00
4 Pek. Pas. Saklar Ganda DH.15.5 BH 5.00 Rp 34,540.00 Rp 172,700.00
5 Pek. Pas. Stop Kontak HSBU TTK 10.00 Rp 143,900.00 Rp 1,439,000.00
6 Pek. Pas. Panel Listrik DH.PL.1 bh 1.00 Rp 3,045,075.00 Rp 3,045,075.00
7 Pek. Pas. Grounding DH.15.6 BH 2.00 Rp 990,000.00 Rp 1,980,000.00
subjumlah : Rp 16,335,134.00

XI Pekerjaan Sanitasi
Talang Air
1 Pek. Pas. Talang Rangka Galvanis DH.PJ.18 M' 75.70 Rp 472,821.64 Rp 35,792,598.30
2 Pek. Pas. Pipa PVC dia. 4 In A.5.1.1.32 M' 160.00 Rp 65,683.26 Rp 10,509,320.80
3 Pek. Pas. Closet A.5.1.1.1 bh 4.00 Rp 1,144,168.30 Rp 4,576,673.20
4 Pek. Pas. Bak A.5.1.1.9 bh 4.00 Rp 2,039,763.00 Rp 8,159,052.00
5 Pek. Pas. Keran A.5.1.1.19 bh 37.00 Rp 108,760.85 Rp 4,024,151.45
Drainase
1 Pek. Galian Tanah A.2.3.1.1 M3 14.40 Rp 101,004.75 Rp 1,454,468.40
2 Pek. Pas. Batu Bata DH.2.2 M2 144.00 Rp 161,601.00 Rp 23,270,544.00
3 Pek. Plesteran Drainase A. 4.4.2.4 M2 144.00 Rp 81,385.26 Rp 11,719,477.44
4 Pek. Lantai Kerja B.01.a1 M3 1.20 Rp 981,702.26 Rp 1,178,042.71
subjumlah : Rp 100,684,328.30
DAFTAR HARGA SATUAN PEKERJAAN

NO URAIAN PEKERJAAN KODE SATUAN BIAYA

( 1 ) PEKERJAAN PERSIAPAN
1 PEMBUATAN KANTOR SEMENTARA/DIREKSI KEET/Lt. PLESTERAN A. 2.2.1.5 M2 Rp 1,743,860.25
2 PEMBUATAN GUDANG SEMEN DAN ALAT2 A. 2.2.1.7 M2 Rp 1,029,690.75
3 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU A. 2.2.1.6 M2 Rp 1,010,135.50
4 PEKERJAAN PEMBERSIHAN LAPANGAN DAN PEMERATAAN A. 2.2.1.9 M2 Rp 25,217.50
5 PEMBUATAN BEDENG BURUH A. 2.2.1.8 M2 Rp 1,155,737.00
6 PEMBUATAN PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2M A. 2.2.1.2 M' Rp 293,280.35
7 PENGUKURAN & PEMASANGAN 1M' BOUWPLANK A. 2.2.1.4 M' Rp 65,283.35
8 GALIAN TANAH BIASA SEDALAM 1M A.2.3.1.1 M3 Rp 101,004.75
9 GALIAN TANAH BIASA SEDALAM 2M A.2.3.1.2 M3 Rp 124,982.55
10 GALIAN TANAH BIASA SEDALAM 3M A.2.3.1.3 M3 Rp 149,463.93
11 PEKERJAAN TIMBUNAN TANAH KEMBALI A.2.3.1.9 M3 Rp 75,729.50

( 2 ) PEKERJAAN DINDING
1 PASANGAN DINDING BATA MERAH/TEBAL 1/2 BATA/1 PC : 2 PS DH.2.1 M2 Rp 172,101.05
2 PASANGAN DINDING BATA MERAH/TEBAL 1/2 BATA/1 PC : 4 PS DH.2.2 M2 Rp 161,601.00
3 PLESTERAN TEMBOK 1 PC : 2 PS / TEBAL 15 MM A. 4.4.2.2 M2 Rp 88,131.63
4 PLESTERAN TEMBOK 1 PC : 4 PS / TEBAL 15 MM A. 4.4.2.4 M2 Rp 81,385.26
5 ACIAN A. 4.4.2.27 M2 Rp 52,214.80

( 3 ) PEKERJAAN KAYU PINTU


1 KUSEN PINTU DAN JENDELA A. 4.6.1.2 M3 Rp 7,708,789.00
2 PINTU KACA DAN JENDELA KACA A. 4.6.1.6 M2 Rp 652,005.20
3 PASANGAN PINTU TEAKWOOD RANGKAP/ RANGKA KAYU A. 4.6.1.11 M2 Rp 752,517.70

( 4 ) PEKERJAAN ATAP & LANGIT-LANGIT


1 PASANG BUBUNGAN METAL (Standard) DH.4.1 M' Rp 130,988.55
2 PASANG BUBUNGAN ALUMUNIUM DH.4.2 M' Rp 121,088.55
3 PASANG PENUTUP ATAP SENG GALVALUM DH.4.3 M2 Rp 70,817.01
4 PASANG 1M2 ROOFLIGHT FIBERGLASS 90 X 180 CM A.4.5.2.7 M2 Rp 86,898.02
5 PASANG LISPLANK GRC DH.4.5 M' Rp 82,117.37
6 PASANG LIST PLAFOND GYPSUM DH.4.6 M' Rp 46,420.60
7 RANGKA BESI HOLLOW 1X40.40.0,25 MM, modul 60 x 60 cm, untuk plafond A.4.2.1.21 M2 Rp 149,131.62
8 PASANG PLAFOND GYPSUM BOARD tebal 9 mm A. 4.5.1.7 M2 Rp 66,368.07

( 6 ) PEKERJAAN DINDING PEMISAH


1 RANGKA BESI HOLLOW 1X40.40.0,25 MM, modul 60 x 120 cm, untuk partisi A.4.2.1.20 M2 Rp 112,431.77

( 7 ) PEKERJAAN BETON (ADUKAN)


1 MEMBUAT BETON MUTU f'c = 7,4 MPa (K-100) A. 4.1.1.1 M3 Rp 1,081,740.44
2 MEMBUAT BETON MUTU f'c = 14,5 MPa (K-175) A. 4.1.1.5 M3 Rp 1,197,646.34

( 8 ) PEKERJAAN PEMBETONAN
1 MEMBUAT BETON TUMBUK 1PC : 3PS : 5KR B.01.a1 M3 Rp 981,702.26
2 MEMBUAT PONDASI BETON BERTULANG (150 kg besi + Bekesting) A.4.1.1.28 M3 Rp 4,518,755.23
3 MEMBUAT SLOOF BETON BERTULANG (200 kg besi + Bekesting) A.4.1.1.29 M3 Rp 5,476,193.14
4 MEMBUAT DINDING BETON BERTULANG (200 kg besi + Bekesting) A.4.1.1.34 M3 Rp 6,260,493.14
5 MEMBUAT KOLOM BETON BERTULANG (300 kg besi + Bekesting) A.4.1.1.30 M3 Rp 10,734,530.84
6 MEMBUAT BALOK BETON BERTULANG (200 kg besi + Bekesting) A.4.1.1.31 M3 Rp 6,643,548.89
7 MEMBUAT KOLOM BETON BERTULANG (150 kg besi + Bekesting) A.4.1.1.32 M3 Rp 5,829,020.45
8 MEMBUAT KOLOM PRAKTIS BETON BERTULANG/ 11X11 CM A.4.1.1.35 M' Rp 99,974.05
9 MEMBUAT RING BALOK PRAKTIS BETON BERTULANG/ 10X15 CM A.4.1.1.36 M' Rp 127,020.19
10 PEMBESIAN DENGAN BESI POLOS (1 kg) A.4.1.1.17 KG Rp 14,329.67
11 PEMBESIAN DENGAN BESI ULIR (1 kg) A.4.1.1.17 KG Rp 15,303.27
12 PASANGAN BEKISTING UNTUK PONDASI A.4.1.1.20 M2 Rp 211,468.18
13 PASANGAN BEKISTING UNTUK SLOOF A.4.1.1.21 M2 Rp 221,368.18
14 PASANGAN BEKISTING UNTUK KOLOM A.4.1.1.22 M2 Rp 370,670.19
15 PASANGAN BEKISTING UNTUK BALOK A.4.1.1.23 M2 Rp 378,920.19
16 PASANGAN BEKISTING UNTUK PLAT A.4.1.1.24 M2 Rp 414,670.19

( 9 ) PEKERJAAN BAJA
1 PEMASANGAN 1 KG A.4.2.1.2 KG Rp 41,627.41
2 PENGERJAAN 100 KG PEKERJAAN PERAKITAN A.4.2.1.3 KG Rp 269,321.69
3 PENGERJAAN 1 M2 PINTU PLAT BAJA TEBAL 2 MM RANGKAP, RANGKA BAJA SIKU-SIKU A.4.2.1.4 M2 Rp 1,247,361.28
( 10 ) PEKERJAAN SANITASI
1 MEMASANG 1 m' Pipa PVC TIPE AW DIAMETER 3/4" A.5.1.1.26 M' Rp 20,036.78
2 MEMASANG 1 m' PIPA PVC TIPE AW DIAMETER 1/2" A.5.1.1.25 M' Rp 19,077.71
3 MEMASANG 1 m' PIPA PVC TIPE AW DIAMETER 1" A.5.1.1.27 M' Rp 20,889.28
4 MEMASANG 1 m' PIPA PVC TIPE AW DIAMETER 1,5" A.5.1.1.28 M' Rp 31,653.60
5 MEMASANG 1 m' PIPA PVC TIPE AW DIAMETER 2" A.5.1.1.29 M' Rp 32,506.10
6 MEMASANG 1 m' PIPA PVC TIPE AW DIAMETER 3" A.5.1.1.31 M' Rp 53,748.26
7 MEMASANG 1 m' PIPA PVC TIPE AW DIAMETER 4"- 6" A.5.1.1.32 M' Rp 65,683.26
8 MEMASANG 1 bh KRAN A.5.1.1.19 BH Rp 108,760.85
9 MEMASANG 1 BUAH KLOSET JONGKOK A.5.1.1.1 BH Rp 1,144,168.30
10 MEMASANG 1 BH BAK CUCI STAINLES STEEL A.5.1.1.12 BH Rp 380,016.45
11 MEMASANG 1 bh KRAN LEHER ANGSA DH.10.11 BH Rp 713,760.85
12 MEMASANG 1 bh FLOOR DRAIN A.5.1.1.14 BH Rp 60,672.15
13 MEMASANG 1 BH BAK MANDI TERASO VOL. 0,3 M3 A.5.1.1.9 BH Rp 2,039,763.00

( 11 ) PEKERJAAN PENUTUP DINDING


1 PEMASANGAN DINDING KERAMIK 30 X 60 DH.11.1 M2 Rp 292,640.81

( 12 ) PEKERJAAN LANTAI
1 PEMASANGAN LANTAI KERAMIK 20 X 20 ANTI SLIP DH.12.1 M2 Rp 268,970.90
3 PEMASANGAN LANTAI KERAMIK 40 x 40 CORAK DH.12.3 M2 Rp 163,258.59
4 PEMASANGAN LANTAI KERAMIK 30 x 30 CORAK DH.12.4 M2 Rp 262,606.30
5 PEMASANGAN LANTAI KERAMIK 60 X 60 CORAK DH.12.2 M2 Rp 302,265.81

( 13 ) PEKERJAAN PENGECATAN
1 Pengecatan Bidang Kayu/Besi Baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup) A. 4.7.1.5 M2 Rp 75,754.58
PENGECETAN TEMBOK BARU INTERIOR (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT
2 PENUTUP) A. 4.7.1.10 M2 Rp 60,084.83
PENGECETAN TEMBOK BARU EKSTERIOR (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT
3 PENUTUP) A. 4.7.1.10 M2 Rp 48,204.83

( 14 ) PEKERJAAN KUNCI & KACA


1 PASANG KACA, TEBAL 5 CM A.4.6.2.17 M2 Rp 251,296.23
2 PASANG KUNCI TANAM A.4.6.2.2 BH Rp 232,773.75
3 PASANG KUNCI TANAM KAMAR MANDI A. 4.6.2.3 BH Rp 231,638.77
4 PASANG ENGSEL PINTU A.4.6.2.5 BH Rp 57,421.23
5 PASANG KUNCI SLOT A.4.6.2.11 BH Rp 55,828.19
6 PASANG KAIT ANGIN A.4.6.2.9 BH Rp 42,571.23
7 KACA CERMIN TEBAL 8 MM A. 4.6.2.20 M2 Rp 275,384.12

( 15 ) PEKERJAAN INSTALASI LISTRIK


1 1 TTK PEMASANGAN INSTALASI LAMPU & SAKLAR DH.15.1 TTK Rp 171,474.16
2 1 SET PEMASANGAN LAMPU TL.LED 218 DH.15.2 SET Rp 352,000.00
3 1 SET PEMASANGAN LAMPU DL. 18 DH.15.3 SET Rp 102,300.00
4 1 BH PEMASANGAN SAKLAR TUNGGAL DH.15.4 BH Rp 26,301.00
5 1 BH PEMASANGAN SAKLAR GANDA DH.15.5 BH Rp 34,540.00
6 1 BH PEMASANGAN GROUND ROD DH.15.6 BH Rp 990,000.00

( 16 ) PEKERJAAN LANSKAP
1 1 M3 PENGURUGAN DENGAN PASIR URUG A.2.3.1.11 M3 Rp 106,401.90
2 1 M3 PENGURUGAN KEMBALI GALIAN TANAH A.2.3.1.9 M3 Rp 75,729.50
3 1 M3 PONDASI BATU BELAH CAMPURAN 1SP : 4PP A.3.2.1.2 M3 Rp 1,193,794.25
4 1 M2 PEMASANGAN PAVINGBLOCK DH.16.4 M2 Rp 143,092.40
5 1 M3 PENGURUGAN DENGAN SIRTU PADAT A.2.3.1.14 M3 Rp 392,587.25
6 1 M3 PASANGAN BATU KOSONG ANSTAMPING A.3.3.1.9 M3 Rp 756,514.77
7 1 M PASANG KANSTIN DH.16.7 M' Rp 115,844.19

(17) PEKERJAAN KUSEN PINTU JENDELA


1 1 UNIT JALUSI + KAWAT HARMONIKA RANGKAP DH.PJ.1 unit Rp 2,123,807.98
2 1 UNIT KUSEN & DAUN PINTU KAYU P1 KANTOR DH.PJ.2 unit Rp 3,748,203.55
3 1 UNIT KUSEN & DAUN PINTU KAYU P2 KANTOR DH.PJ.3 unit Rp 2,287,390.35
4 1 UNIT KUSEN & DAUN PINTU KAYU P1 (SINGLEPINTU) RP DH.PJ.4 unit Rp 2,098,594.89
5 1 UNIT KUSEN DAN DAUN JENDELA + KACA J1 KANTOR DH.PJ.5 unit Rp 1,305,858.84
6 1 UNIT KUSEN DAN DAUN JENDELA + KACA J2 KANTOR DH.PJ.6 unit Rp 1,419,844.69
7 1 UNIT BV ALUMUNIUM BV DH.PJ.10 unit Rp 384,319.10
8 1 UNIT KUSEN & DAUN JENDELA ALUMUNIUM PJ DH.PJ.11 unit Rp 1,192,328.94
9 1 UNIT KUSEN & DAUN PINTU ALUMUNIUM PJ DH.PJ.12 unit Rp 2,333,415.42
10 1 UNIT KUSEN & DAUN JENDELA ALUMUNIUM J1 RP DH.PJ.7 unit Rp 2,861,235.30
11 1 UNIT KUSEN & DAUN JENDELA ALUMUNIUM J2 RP DH.PJ.8 unit Rp 2,739,982.30
12 1 UNIT KUSEN & DAUN JENDELA ALUMUNIUM J3 RP DH.PJ.9 unit Rp 910,249.45
13 1 UNIT PINTU BESI UTAMA RG DH.PH.13 unit Rp 2,393,543.70
14 1 UNIT BV BESI RG DH.PJ.14 unit Rp 496,274.46
15 1 UNIT RAILING PAGAR BESI DH.PJ.15 unit Rp 1,301,608.20
16 1 UNIT PAGAR BESI GESER DH.PJ.16 unit Rp 8,351,290.69
17 1 UNIT PINTU FIBER WC DH.PJ.17 unit Rp 442,379.30
18 1 M' PASANG TALANG AIR DH.PJ.18 unit Rp 472,821.64
ANALISA HARGA BAHAN DAN UPAH
STANDAR NASIONAL INDONESIA ( S N I )

Bahan/ Harga upah dan Jumlah = Koefisien x


No. Koofisien Sat Uraian Keterangan @ Overhead 10% Total
Upah Bahan Harga

a b c d e f g h i=cxh j = i x (10% s/d k=i+j


15%)

( 1 ) PEKERJAAN PERSIAPAN
1 PEMBUATAN KANTOR SEMENTARA/DIREKSI KEET/Lt. PLESTERAN M2 Rp 1,743,860.25
A. 2.2.1.5 Bahan
1.25000 bt Dolken Ø 8-10 Cm @ Rp 10,000.00 Rp 12,500.00 Rp 1,250.00 Rp 13,750.00
0.18000 m3 Kayu Kelas IV @ Rp 1,500,000.00 Rp 270,000.00 Rp 27,000.00 Rp 297,000.00
0.85000 kg Paku 2-5" @ Rp 18,000.00 Rp 15,300.00 Rp 1,530.00 Rp 16,830.00
1.10000 kg Besi Strip @ Rp 13,000.00 Rp 14,300.00 Rp 1,430.00 Rp 15,730.00
35.00000 Kg Semen (PC) @ Rp 1,340.00 Rp 46,900.00 Rp 4,690.00 Rp 51,590.00
0.15000 m3 Pasir Pasangan @ Rp 87,500.00 Rp 13,125.00 Rp 1,312.50 Rp 14,437.50
0.10000 m3 Pasir Beton @ Rp - Rp - Rp -
0.15000 m3 Batu Pecah 0,5 + 1 cm Koral beton @ Rp - Rp - Rp -
30.00000 Bh Batu Bata Kecil @ Rp - Rp - Rp -
0.25000 Lbr Seng Plat @ Rp 40,850.00 Rp 10,212.50 Rp 1,021.25 Rp 11,233.75
2.00000 Bh Kaca nako reyben 5 mm (lengkap) @ Rp 200,000.00 Rp 400,000.00 Rp 40,000.00 Rp 440,000.00
0.08000 M2 Kaca 3 mm @ Rp - Rp - Rp -
0.15000 Bh Kunci tanam 1 x putar @ Rp 127,500.00 Rp 19,125.00 Rp 1,912.50 Rp 21,037.50
0.06000 Lbr Plywood 4mm @ Rp 115,000.00 Rp 6,900.00 Rp 690.00 Rp 7,590.00
Upah :
2.00000 Oh Tukang kayu Kayu @ Rp 160,300.00 Rp 320,600.00 Rp 32,060.00 Rp 352,660.00
1.00000 Oh Tukang batu Batu @ Rp 160,300.00 Rp 160,300.00 Rp 16,030.00 Rp 176,330.00
2.00000 Oh Pekerja @ Rp 114,800.00 Rp 229,600.00 Rp 22,960.00 Rp 252,560.00
0.30000 Oh Kepala Tukang @ Rp 183,400.00 Rp 55,020.00 Rp 5,502.00 Rp 60,522.00
0.05000 Oh Mandor Lapangan @ Rp 228,900.00 Rp 11,445.00 Rp 1,144.50 Rp 12,589.50
2 PEMBUATAN GUDANG SEMEN DAN ALAT2 M2 Rp 1,029,690.75
A. 2.2.1.7 Bahan
1.70000 bt Dolken Ø 8-10 Cm @ Rp 10,000.00 Rp 17,000.00 Rp 1,700.00 Rp 18,700.00
0.21000 m3 Kayu Kelas IV @ Rp 1,500,000.00 Rp 315,000.00 Rp 31,500.00 Rp 346,500.00
0.30000 Kg Paku 2-5" @ Rp 18,000.00 Rp 5,400.00 Rp 540.00 Rp 5,940.00
10.50000 Kg Semen (PC) @ Rp 1,340.00 Rp 14,070.00 Rp 1,407.00 Rp 15,477.00
0.03000 m3 Pasir Beton @ Rp 87,500.00 Rp 2,625.00 Rp 262.50 Rp 2,887.50
0.05000 m3 Batu Pecah 2/3 cm @ Rp 415,000.00 Rp 20,750.00 Rp 2,075.00 Rp 22,825.00
1.50000 lbr Seng Gelombang @ Rp 45,000.00 Rp 67,500.00 Rp 6,750.00 Rp 74,250.00
0.25000 lbr Seng pelat @ Rp 40,850.00 Rp 10,212.50 Rp 1,021.25 Rp 11,233.75
Upah :
2.00000 Oh Tukang Kayu Kayu @ Rp 160,300.00 Rp 320,600.00 Rp 32,060.00 Rp 352,660.00
1.00000 Oh Pekerja @ Rp 114,800.00 Rp 114,800.00 Rp 11,480.00 Rp 126,280.00
0.20000 Oh Kepala Tukang @ Rp 183,400.00 Rp 36,680.00 Rp 3,668.00 Rp 40,348.00
0.05000 Oh Mandor Lapangan @ Rp 228,900.00 Rp 11,445.00 Rp 1,144.50 Rp 12,589.50
3 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU M2 Rp 1,010,135.50
A. 2.2.1.6 Bahan
3.00000 bt Dolken Ø 8-10 Cm @ Rp 10,000.00 Rp 30,000.00 Rp 3,000.00 Rp 33,000.00
0.27600 m3 Kayu Kelas IV Usuk 5/7 @ Rp 1,500,000.00 Rp 414,000.00 Rp 41,400.00 Rp 455,400.00
1.50000 lbr Seng Gelombang @ Rp 45,000.00 Rp 67,500.00 Rp 6,750.00 Rp 74,250.00
0.70000 kg Paku 2-5" @ Rp 18,000.00 Rp 12,600.00 Rp 1,260.00 Rp 13,860.00
Upah :
1.50000 Oh Tukang Kayu Kayu @ Rp 160,300.00 Rp 240,450.00 Rp 24,045.00 Rp 264,495.00
1.00000 Oh Pekerja @ Rp 114,800.00 Rp 114,800.00 Rp 11,480.00 Rp 126,280.00
0.15000 Oh Kepala Tukang @ Rp 183,400.00 Rp 27,510.00 Rp 2,751.00 Rp 30,261.00
0.05000 Oh Mandor Lapangan @ Rp 228,900.00 Rp 11,445.00 Rp 1,144.50 Rp 12,589.50
4 PEKERJAAN PEMBERSIHAN LAPANGAN DAN PEMERATAAN M2 Rp 25,217.50
A. 2.2.1.9 Bahan -
Upah :
0.10000 Oh Pekerja @ Rp 114,800.00 Rp 11,480.00 Rp 1,148.00 Rp 12,628.00
0.05000 Oh Mandor Lapangan @ Rp 228,900.00 Rp 11,445.00 Rp 1,144.50 Rp 12,589.50
5 PEMBUATAN BEDENG BURUH M2 Rp 1,155,737.00
A. 2.2.1.8 Bahan
1.25000 bt Dolken Ø 8-10 Cm @ Rp 10,000.00 Rp 12,500.00 Rp 1,250.00 Rp 13,750.00
18.00000 kg Semen (PC) @ Rp 1,340.00 Rp 24,120.00 Rp 2,412.00 Rp 26,532.00
0.18600 m3 Kayu Kelas IV Usuk 5/7 @ Rp 1,500,000.00 Rp 279,000.00 Rp 27,900.00 Rp 306,900.00
0.03000 m3 Pasir Beton @ Rp 87,500.00 Rp 2,625.00 Rp 262.50 Rp 2,887.50
0.05000 m3 Batu Pecah 2/3 cm @ Rp 415,000.00 Rp 20,750.00 Rp 2,075.00 Rp 22,825.00
1.35000 lbr Plywood 4mm @ Rp 115,000.00 Rp 155,250.00 Rp 15,525.00 Rp 170,775.00
1.50000 lbr Seng Gelombang @ Rp 45,000.00 Rp 67,500.00 Rp 6,750.00 Rp 74,250.00
0.30000 kg Paku 2-5" @ Rp 18,000.00 Rp 5,400.00 Rp 540.00 Rp 5,940.00
Upah :
2.00000 Oh Tukang Kayu Kayu @ Rp 160,300.00 Rp 320,600.00 Rp 32,060.00 Rp 352,660.00
1.00000 Oh Pekerja @ Rp 114,800.00 Rp 114,800.00 Rp 11,480.00 Rp 126,280.00
0.20000 Oh Kepala Tukang @ Rp 183,400.00 Rp 36,680.00 Rp 3,668.00 Rp 40,348.00
0.05000 Oh Mandor Lapangan @ Rp 228,900.00 Rp 11,445.00 Rp 1,144.50 Rp 12,589.50
6 PEMBUATAN PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2M M' Rp 293,280.35
A. 2.2.1.2 Bahan
1.25000 bt Dolken Ø 8-10 Cm @ Rp 10,000.00 Rp 12,500.00 Rp 1,250.00 Rp 13,750.00
2.50000 kg Semen (PC) @ Rp 1,340.00 Rp 3,350.00 Rp 335.00 Rp 3,685.00
0.07200 m3 Kayu Kelas IV Usuk 5/7 @ Rp 1,500,000.00 Rp 108,000.00 Rp 10,800.00 Rp 118,800.00
0.00500 m3 Pasir Beton @ Rp 87,500.00 Rp 437.50 Rp 43.75 Rp 481.25
0.00900 m3 Batu Pecah 2/3 cm @ Rp 415,000.00 Rp 3,735.00 Rp 373.50 Rp 4,108.50
0.45000 Liter Meni Besi @ Rp 45,000.00 Rp 20,250.00 Rp 2,025.00 Rp 22,275.00
1.20000 lbr Seng Gelombang @ Rp 45,000.00 Rp 54,000.00 Rp 5,400.00 Rp 59,400.00
0.06000 kg Paku 2-5" @ Rp 18,000.00 Rp 1,080.00 Rp 108.00 Rp 1,188.00
Upah :
0.20000 Oh Tukang Kayu Kayu @ Rp 160,300.00 Rp 32,060.00 Rp 3,206.00 Rp 35,266.00
0.20000 Oh Pekerja @ Rp 114,800.00 Rp 22,960.00 Rp 2,296.00 Rp 25,256.00
0.02000 Oh Kepala Tukang @ Rp 183,400.00 Rp 3,668.00 Rp 366.80 Rp 4,034.80
0.02000 Oh Mandor Lapangan @ Rp 228,900.00 Rp 4,578.00 Rp 457.80 Rp 5,035.80
7 PENGUKURAN & PEMASANGAN 1M' BOUWPLANK M' Rp 65,283.35
A. 2.2.1.4 Bahan
0.01200 m3 Kayu Kelas IV Usuk 5/7 @ Rp 1,500,000.00 Rp 18,000.00 Rp 1,800.00 Rp 19,800.00
0.00700 m3 Kayu Kelas IV Papan Rp 1,500,000.00 Rp 10,500.00 Rp 1,050.00 Rp 11,550.00
0.02000 kg Paku 2-5" @ Rp 18,000.00 Rp 360.00 Rp 36.00 Rp 396.00
Upah :
0.10000 Oh Tukang Kayu Kayu @ Rp 160,300.00 Rp 16,030.00 Rp 1,603.00 Rp 17,633.00
0.10000 Oh Pekerja @ Rp 114,800.00 Rp 11,480.00 Rp 1,148.00 Rp 12,628.00
0.01000 Oh Kepala Tukang @ Rp 183,400.00 Rp 1,834.00 Rp 183.40 Rp 2,017.40
0.00500 Oh Mandor Lapangan @ Rp 228,900.00 Rp 1,144.50 Rp 114.45 Rp 1,258.95
8 GALIAN TANAH BIASA SEDALAM 1M M3 Rp 101,004.75
A.2.3.1.1 Bahan -
Upah
0.75000 Oh Pekerja @ Rp 114,800.00 Rp 86,100.00 Rp 8,610.00 Rp 94,710.00
0.02500 Oh Mandor Lapangan @ Rp 228,900.00 Rp 5,722.50 Rp 572.25 Rp 6,294.75
9 GALIAN TANAH BIASA SEDALAM 2M M3 Rp 124,982.55
A.2.3.1.2 Bahan -
Upah
0.90000 Oh Pekerja @ Rp 114,800.00 Rp 103,320.00 Rp 10,332.00 Rp 113,652.00
0.04500 Oh Mandor Lapangan @ Rp 228,900.00 Rp 10,300.50 Rp 1,030.05 Rp 11,330.55
10 GALIAN TANAH BIASA SEDALAM 3M M3 Rp 149,463.93
A.2.3.1.3 Bahan -
Upah
1.05000 Oh Pekerja @ Rp 114,800.00 Rp 120,540.00 Rp 12,054.00 Rp 132,594.00
0.06700 Oh Mandor Lapangan @ Rp 228,900.00 Rp 15,336.30 Rp 1,533.63 Rp 16,869.93
( 2 ) PEKERJAAN DINDING
1 PASANGAN DINDING BATA MERAH/TEBAL 1/2 BATA/1 PC : 2 PS M2 Rp 172,101.05
DH.2.1 Bahan
45.00000 Bh Bata merah @ Rp 1,600.00 Rp 72,000.00 Rp 7,200.00 Rp 79,200.00
18.95000 kg Semen (PC) @ Rp 1,340.00 Rp 25,393.00 Rp 2,539.30 Rp 27,932.30
0.03800 m3 Pasir Pasang @ Rp 87,500.00 Rp 3,325.00 Rp 332.50 Rp 3,657.50
Upah :
0.30000 Oh Pekerja @ Rp 114,800.00 Rp 34,440.00 Rp 3,444.00 Rp 37,884.00
0.10000 Oh Tukang batu @ Rp 160,300.00 Rp 16,030.00 Rp 1,603.00 Rp 17,633.00
0.01000 Oh Kepala Tukang @ Rp 183,400.00 Rp 1,834.00 Rp 183.40 Rp 2,017.40
0.01500 Oh Mandor Lapangan @ Rp 228,900.00 Rp 3,433.50 Rp 343.35 Rp 3,776.85
2 PASANGAN DINDING BATA MERAH/TEBAL 1/2 BATA/1 PC : 4 PS M2 Rp 161,601.00
DH.2.2 Bahan
45.00000 Bh Bata merah @ Rp 1,600.00 Rp 72,000.00 Rp 7,200.00 Rp 79,200.00
11.50000 kg Semen (PC) @ Rp 1,340.00 Rp 15,410.00 Rp 1,541.00 Rp 16,951.00
0.04300 m3 Pasir Pasangan @ Rp 87,500.00 Rp 3,762.50 Rp 376.25 Rp 4,138.75
Upah :
0.30000 Oh Pekerja @ Rp 114,800.00 Rp 34,440.00 Rp 3,444.00 Rp 37,884.00
0.10000 Oh Tukang batu @ Rp 160,300.00 Rp 16,030.00 Rp 1,603.00 Rp 17,633.00
0.01000 Oh Kepala Tukang @ Rp 183,400.00 Rp 1,834.00 Rp 183.40 Rp 2,017.40
0.01500 Oh Mandor Lapangan @ Rp 228,900.00 Rp 3,433.50 Rp 343.35 Rp 3,776.85
3 PLESTERAN TEMBOK 1 PC : 2 PS / TEBAL 15 MM M2 Rp 88,131.63
A. 4.4.2.2 Bahan
10.22400 kg Semen (PC) @ Rp 1,340.00 Rp 13,700.16 Rp 1,370.02 Rp 15,070.18
0.02000 m3 Pasir Pasangan @ Rp 87,500.00 Rp 1,750.00 Rp 175.00 Rp 1,925.00
Upah :
0.30000 Oh Pekerja @ Rp 114,800.00 Rp 34,440.00 Rp 3,444.00 Rp 37,884.00
0.15000 Oh Tukang batu @ Rp 160,300.00 Rp 24,045.00 Rp 2,404.50 Rp 26,449.50
0.01500 Oh Kepala Tukang @ Rp 183,400.00 Rp 2,751.00 Rp 275.10 Rp 3,026.10
0.01500 Oh Mandor Lapangan @ Rp 228,900.00 Rp 3,433.50 Rp 343.35 Rp 3,776.85
4 PLESTERAN TEMBOK 1 PC : 4 PS / TEBAL 15 MM M2 Rp 81,385.26
A. 4.4.2.4 Bahan
6.24000 kg Semen (PC) @ Rp 1,340.00 Rp 8,361.60 Rp 836.16 Rp 9,197.76
0.02400 m3 Pasir Pasangan @ Rp 87,500.00 Rp 2,100.00 Rp 210.00 Rp 2,310.00
Upah :
0.30000 Oh Pekerja @ Rp 114,800.00 Rp 34,440.00 Rp 3,444.00 Rp 37,884.00
0.15000 Oh Tukang batu @ Rp 160,300.00 Rp 24,045.00 Rp 2,404.50 Rp 26,449.50
0.01500 Oh Kepala Tukang @ Rp 183,400.00 Rp 2,751.00 Rp 275.10 Rp 3,026.10
0.01000 Oh Mandor Lapangan @ Rp 228,900.00 Rp 2,289.00 Rp 228.90 Rp 2,517.90
5 ACIAN M2 Rp 52,214.80
A. 4.4.2.27 Bahan :
3.25000 kg Semen (PC) @ Rp 1,340.00 Rp 4,355.00 Rp 435.50 Rp 4,790.50
Upah :
0.20000 Oh Pekerja @ Rp 114,800.00 Rp 22,960.00 Rp 2,296.00 Rp 25,256.00
0.10000 Oh Tukang @ Rp 160,300.00 Rp 16,030.00 Rp 1,603.00 Rp 17,633.00
0.01000 Oh Kepala Tukang @ Rp 183,400.00 Rp 1,834.00 Rp 183.40 Rp 2,017.40
0.01000 Oh Mandor Lapangan @ Rp 228,900.00 Rp 2,289.00 Rp 228.90 Rp 2,517.90
( 3 ) PEKERJAAN KAYU PINTU
1 KUSEN PINTU DAN JENDELA M3 Rp 7,708,789.00
A. 4.6.1.2 Bahan
1.20000 m3 Kayu Kelas II (balok/Usuk) @ Rp 2,500,000.00 Rp 3,000,000.00 Rp 300,000.00 Rp 3,300,000.00
1.25000 kg Paku 1/2"- 1" @ Rp 20,000.00 Rp 25,000.00 Rp 2,500.00 Rp 27,500.00
1.00000 kg Lem fox/lem putih @ Rp 10,000.00 Rp 10,000.00 Rp 1,000.00 Rp 11,000.00
Upah :
6.00000 Oh Pekerja @ Rp 114,800.00 Rp 688,800.00 Rp 68,880.00 Rp 757,680.00
18.00000 Oh Tukang Kayu @ Rp 160,300.00 Rp 2,885,400.00 Rp 288,540.00 Rp 3,173,940.00
1.80000 Oh Kepala Tukang @ Rp 183,400.00 Rp 330,120.00 Rp 33,012.00 Rp 363,132.00
0.30000 Oh Mandor Lapangan @ Rp 228,900.00 Rp 68,670.00 Rp 6,867.00 Rp 75,537.00
2 PINTU KACA DAN JENDELA KACA M2 Rp 652,005.20
A. 4.6.1.6 Bahan
0.02400 m3 Kayu Papan Kelas II @ Rp 2,500,000.00 Rp 60,000.00 Rp 6,000.00 Rp 66,000.00
0.30000 kg Lem fox/lem putih @ Rp 10,000.00 Rp 3,000.00 Rp 300.00 Rp 3,300.00
Upah :
0.80000 Oh Pekerja @ Rp 114,800.00 Rp 91,840.00 Rp 9,184.00 Rp 101,024.00
2.40000 Oh Tukang kayu @ Rp 160,300.00 Rp 384,720.00 Rp 38,472.00 Rp 423,192.00
0.24000 Oh Kepala Tukang @ Rp 183,400.00 Rp 44,016.00 Rp 4,401.60 Rp 48,417.60
0.04000 Oh Mandor Lapangan @ Rp 228,900.00 Rp 9,156.00 Rp 915.60 Rp 10,071.60
3 PASANGAN PINTU TEAKWOOD RANGKAP/ RANGKA KAYU M2 Rp 752,517.70
A. 4.6.1.11 Bahan
0.02500 m3 Kayu Kelas II Papan @ Rp 2,500,000.00 Rp 62,500.00 Rp 6,250.00 Rp 68,750.00
0.03000 kg Paku 1/2"- 1" @ Rp 20,000.00 Rp 600.00 Rp 60.00 Rp 660.00
0.30000 lt Lem fox/lem putih @ Rp 10,000.00 Rp 3,000.00 Rp 300.00 Rp 3,300.00
1.00000 lbr Teakwood 4mm @ Rp 88,275.00 Rp 88,275.00 Rp 8,827.50 Rp 97,102.50
Upah :
0.80000 Oh Pekerja @ Rp 114,800.00 Rp 91,840.00 Rp 9,184.00 Rp 101,024.00
2.40000 Oh Tukang kayu @ Rp 160,300.00 Rp 384,720.00 Rp 38,472.00 Rp 423,192.00
0.24000 Oh Kepala Tukang @ Rp 183,400.00 Rp 44,016.00 Rp 4,401.60 Rp 48,417.60
0.04000 Oh Mandor Lapangan @ Rp 228,900.00 Rp 9,156.00 Rp 915.60 Rp 10,071.60
( 4 ) PEKERJAAN ATAP & LANGIT-LANGIT
1 PASANG BUBUNGAN METAL (Standard) M' Rp 130,988.55
DH.4.1 Bahan
2.40000 Lbr Bubungan Metal Standar @ Rp 35,000.00 Rp 84,000.00 Rp 8,400.00 Rp 92,400.00
6.00000 bh Paku skrup @ Rp 350.00 Rp 2,100.00 Rp 210.00 Rp 2,310.00
Upah :
0.08400 Oh Pekerja @ Rp 114,800.00 Rp 9,643.20 Rp 964.32 Rp 10,607.52
0.12500 Oh Tukang @ Rp 160,300.00 Rp 20,037.50 Rp 2,003.75 Rp 22,041.25
0.01300 Oh Kepala Tukang @ Rp 183,400.00 Rp 2,384.20 Rp 238.42 Rp 2,622.62
0.00400 Oh Mandor Lapangan @ Rp 228,900.00 Rp 915.60 Rp 91.56 Rp 1,007.16
2 PASANG BUBUNGAN ALUMUNIUM M' Rp 121,088.55
DH.4.2 Bahan
3.00000 Lbr Bubungan Alumunium Standar 40 cm @ Rp 25,000.00 Rp 75,000.00 Rp 7,500.00 Rp 82,500.00
6.00000 bh Paku skrup @ Rp 350.00 Rp 2,100.00 Rp 210.00 Rp 2,310.00
Upah :
0.08400 Oh Pekerja @ Rp 114,800.00 Rp 9,643.20 Rp 964.32 Rp 10,607.52
0.12500 Oh Tukang @ Rp 160,300.00 Rp 20,037.50 Rp 2,003.75 Rp 22,041.25
0.01300 Oh Kepala Tukang @ Rp 183,400.00 Rp 2,384.20 Rp 238.42 Rp 2,622.62
0.00400 Oh Mandor Lapangan @ Rp 228,900.00 Rp 915.60 Rp 91.56 Rp 1,007.16
3 PASANG PENUTUP ATAP SENG GALVALUM M2 Rp 70,817.01
DH.4.3 Bahan
0.75000 Lbr Atap Seng Galvalum 90 X 180 @ Rp 36,000.00 Rp 27,000.00 Rp 2,700.00 Rp 29,700.00
0.20000 % Peralatan Bantu/Aksesoris @ Rp 36,000.00 Rp 7,200.00 Rp 720.00 Rp 7,920.00
Upah :
0.14000 Oh Pekerja @ Rp 114,800.00 Rp 16,072.00 Rp 1,607.20 Rp 17,679.20
0.07000 Oh Tukang @ Rp 160,300.00 Rp 11,221.00 Rp 1,122.10 Rp 12,343.10
0.00700 Oh Kepala Tukang @ Rp 183,400.00 Rp 1,283.80 Rp 128.38 Rp 1,412.18
0.00700 Oh Mandor Lapangan @ Rp 228,900.00 Rp 1,602.30 Rp 160.23 Rp 1,762.53
4 PASANG 1M2 ROOFLIGHT FIBERGLASS 90 X 180 CM M2 Rp 86,898.02
A.4.5.2.7 Bahan
0.60000 Lbr Rooflight Fiberglass 90 x 180 @ Rp 80,500.00 Rp 48,300.00 Rp 4,830.00 Rp 53,130.00
0.05000 Kg Paku Biasa 1/2" - 1" @ Rp 20,000.00 Rp 1,000.00 Rp 100.00 Rp 1,100.00
Upah :
0.14000 Oh Pekerja @ Rp 114,800.00 Rp 16,072.00 Rp 1,607.20 Rp 17,679.20
0.06700 Oh Tukang @ Rp 160,300.00 Rp 10,740.10 Rp 1,074.01 Rp 11,814.11
0.00700 Oh Kepala Tukang @ Rp 183,400.00 Rp 1,283.80 Rp 128.38 Rp 1,412.18
0.00700 Oh Mandor Lapangan @ Rp 228,900.00 Rp 1,602.30 Rp 160.23 Rp 1,762.53
5 PASANG LISPLANK GRC M' Rp 82,117.37
DH.4.5 Bahan
1.05000 Bh Lisplank GRC @ Rp 23,333.00 Rp 24,499.65 Rp 2,449.97 Rp 26,949.62
0.10000 Kg Paku 2"-5" @ Rp 18,000.00 Rp 1,800.00 Rp 180.00 Rp 1,980.00
Upah :
0.10000 Oh Pekerja @ Rp 114,800.00 Rp 11,480.00 Rp 1,148.00 Rp 12,628.00
0.20000 Oh Tukang @ Rp 160,300.00 Rp 32,060.00 Rp 3,206.00 Rp 35,266.00
0.02000 Oh Kepala Tukang @ Rp 183,400.00 Rp 3,668.00 Rp 366.80 Rp 4,034.80
0.00500 Oh Mandor Lapangan @ Rp 228,900.00 Rp 1,144.50 Rp 114.45 Rp 1,258.95
6 PASANG LIST PLAFOND GYPSUM M' Rp 46,420.60
DH.4.6 Bahan
1.05000 M' List Plafondd gypsum uk. Sedang @ Rp 25,000.00 Rp 26,250.00 Rp 2,625.00 Rp 28,875.00
0.15000 kg Kompon @ Rp 3,945.65 Rp 591.85 Rp 59.18 Rp 651.03
Upah :
0.05000 Oh Pekerja @ Rp 114,800.00 Rp 5,740.00 Rp 574.00 Rp 6,314.00
0.05000 Oh Tukang @ Rp 160,300.00 Rp 8,015.00 Rp 801.50 Rp 8,816.50
0.00500 Oh Kepala Tukang @ Rp 183,400.00 Rp 917.00 Rp 91.70 Rp 1,008.70
0.00300 Oh Mandor Lapangan @ Rp 228,900.00 Rp 686.70 Rp 68.67 Rp 755.37
7 RANGKA BESI HOLLOW 1X40.40.0,25 MM, modul 60 x 60 cm, untuk plafond M2 Rp 149,131.62
A.4.2.1.21 Bahan
4.00000 m Besi hollow Galvalum 40.40.0,25 mm @ Rp 5,750.00 Rp 23,000.00 Rp 2,300.00 Rp 25,300.00
1.00000 H-Batang Aksesoris @ Rp 5,750.00 Rp 5,750.00 Rp 575.00 Rp 6,325.00
Upah :
0.35000 Oh Pekerja @ Rp 114,800.00 Rp 40,180.00 Rp 4,018.00 Rp 44,198.00
0.35000 Oh Tukang besi @ Rp 160,300.00 Rp 56,105.00 Rp 5,610.50 Rp 61,715.50
0.03500 Oh Kepala Tukang @ Rp 183,400.00 Rp 6,419.00 Rp 641.90 Rp 7,060.90
0.01800 Oh Mandor @ Rp 228,900.00 Rp 4,120.20 Rp 412.02 Rp 4,532.22
8 PASANG PLAFOND GYPSUM BOARD tebal 9 mm M2 Rp 66,368.07
A. 4.5.1.7 Bahan
0.36800 lmbr Gypsum board 120 x 240 x 9 @ Rp 75,484.00 Rp 27,778.11 Rp 2,777.81 Rp 30,555.92
0.11000 kg Paku skrup @ Rp 100,000.00 Rp 11,000.00 Rp 1,100.00 Rp 12,100.00
Upah :
0.10000 Oh Pekerja @ Rp 114,800.00 Rp 11,480.00 Rp 1,148.00 Rp 12,628.00
0.05000 Oh Tukang @ Rp 160,300.00 Rp 8,015.00 Rp 801.50 Rp 8,816.50
0.00500 Oh Kepala Tukang @ Rp 183,400.00 Rp 917.00 Rp 91.70 Rp 1,008.70
0.00500 Oh Mandor @ Rp 228,900.00 Rp 1,144.50 Rp 114.45 Rp 1,258.95
( 6 ) PEKERJAAN DINDING PEMISAH
1 RANGKA BESI HOLLOW 1X40.40.0,25 MM, modul 60 x 120 cm, untuk partisi M2 Rp 112,431.77
A.4.2.1.20 Bahan
3.50000 m Besi hollow Galvalum 40.40.0,25 mm @ Rp 5,750.00 Rp 20,125.00 Rp 2,012.50 Rp 22,137.50
1.00000 H-Batang Aksesoris @ Rp 5,750.00 Rp 5,750.00 Rp 575.00 Rp 6,325.00
Upah :
0.25000 Oh Pekerja @ Rp 114,800.00 Rp 28,700.00 Rp 2,870.00 Rp 31,570.00
0.25000 Oh Tukang besi @ Rp 160,300.00 Rp 40,075.00 Rp 4,007.50 Rp 44,082.50
0.02500 Oh Kepala tukang @ Rp 183,400.00 Rp 4,585.00 Rp 458.50 Rp 5,043.50
0.01300 Oh Mandor @ Rp 228,900.00 Rp 2,975.70 Rp 297.57 Rp 3,273.27
(7) PEKERJAAN BETON (ADUKAN)
1 MEMBUAT BETON MUTU f'c = 7,4 MPa (K-100) M3 Rp 1,081,740.44
A. 4.1.1.1 Bahan
247.00000 kg Semen (PC) @ Rp 1,340.00 Rp 330,980.00 Rp 33,098.00 Rp 364,078.00
869.00000 kg Pasir Beton @ Rp 89.00 Rp 77,341.00 Rp 7,734.10 Rp 85,075.10
999.00000 kg Batu Pecah 2/3 cm @ Rp 307.00 Rp 306,693.00 Rp 30,669.30 Rp 337,362.30
215.00000 Liter Air @ Rp 50.00 Rp 10,750.00 Rp 1,075.00 Rp 11,825.00
Upah :
1.65000 Oh Pekerja @ Rp 114,800.00 Rp 189,420.00 Rp 18,942.00 Rp 208,362.00
0.27500 Oh Tukang @ Rp 160,300.00 Rp 44,082.50 Rp 4,408.25 Rp 48,490.75
0.02800 Oh Kepala Tukang @ Rp 183,400.00 Rp 5,135.20 Rp 513.52 Rp 5,648.72
0.08300 Oh Mandor Lapangan @ Rp 228,900.00 Rp 18,998.70 Rp 1,899.87 Rp 20,898.57
2 MEMBUAT BETON MUTU f'c = 14,5 MPa (K-175) M3 Rp 1,197,646.34
A. 4.1.1.5 Bahan
371.00000 kg Semen (PC) @ Rp 1,340.00 Rp 497,140.00 Rp 49,714.00 Rp 546,854.00
698.00000 kg Pasir Beton @ Rp 89.00 Rp 62,122.00 Rp 6,212.20 Rp 68,334.20
1,047.00000 kg Batu Pecah 2/3 cm @ Rp 307.00 Rp 321,429.00 Rp 32,142.90 Rp 353,571.90
215.00000 Liter Air @ Rp 50.00 Rp 10,750.00 Rp 1,075.00 Rp 11,825.00
Upah :
1.65000 Oh Pekerja @ Rp 114,800.00 Rp 189,420.00 Rp 18,942.00 Rp 208,362.00
0.27500 Oh Tukang @ Rp 160,300.00 Rp 44,082.50 Rp 4,408.25 Rp 48,490.75
0.02800 Oh Kepala Tukang @ Rp 183,400.00 Rp 5,135.20 Rp 513.52 Rp 5,648.72
0.08300 Oh Mandor Lapangan @ Rp 228,900.00 Rp 18,998.70 Rp 1,899.87 Rp 20,898.57
3 BETON READY MIX 1 M3 K-300 M3 Rp 1,458,974.00
B.13.a1 Bahan
1.02000 m3 Ready Mix K-300 @ Rp 1,003,500.00 Rp 1,023,570.00 Rp 102,357.00 Rp 1,125,927.00
0.12000 H-Beton Perlengkapan/Alat bantu @ Rp 1,003,500.00 Rp 120,420.00 Rp 12,042.00 Rp 132,462.00
Upah :
1.00000 Oh Pekerja @ Rp 114,800.00 Rp 114,800.00 Rp 11,480.00 Rp 126,280.00
0.25000 Oh Tukang @ Rp 160,300.00 Rp 40,075.00 Rp 4,007.50 Rp 44,082.50
0.02500 Kepala tukang @ Rp 183,400.00 Rp 4,585.00 Rp 458.50 Rp 5,043.50
0.10000 Oh Mandor Lapangan @ Rp 228,900.00 Rp 22,890.00 Rp 2,289.00 Rp 25,179.00
( 8 ) PEKERJAAN PEMBETONAN
1 MEMBUAT BETON TUMBUK 1PC : 3PS : 5KR M3 Rp 981,702.26
B.01.a1 Bahan
200.00000 kg Semen (PC) @ Rp 1,340.00 Rp 268,000.00 Rp 26,800.00 Rp 294,800.00
0.52200 m3 Pasir Beton @ Rp 87,500.00 Rp 45,675.00 Rp 4,567.50 Rp 50,242.50
0.86200 m3 Batu Pecah 2/3 cm @ Rp 415,000.00 Rp 357,730.00 Rp 35,773.00 Rp 393,503.00
Upah :
1.32000 Oh Pekerja @ Rp 114,800.00 Rp 151,536.00 Rp 15,153.60 Rp 166,689.60
0.22000 Oh Tukang @ Rp 160,300.00 Rp 35,266.00 Rp 3,526.60 Rp 38,792.60
0.02200 Oh Kepala Tukang @ Rp 183,400.00 Rp 4,034.80 Rp 403.48 Rp 4,438.28
0.13200 Oh Mandor Lapangan @ Rp 228,900.00 Rp 30,214.80 Rp 3,021.48 Rp 33,236.28
2 MEMBUAT PONDASI BETON BERTULANG (150 kg besi + Bekesting) M3 Rp 4,518,755.23
A.4.1.1.28 Bahan
0.20000 m3 Kayu klas IV Papan @ Rp 1,500,000.00 Rp 300,000.00 Rp 30,000.00 Rp 330,000.00
1.50000 Kg Paku 2"-5" @ Rp 18,000.00 Rp 27,000.00 Rp 2,700.00 Rp 29,700.00
157.50000 Kg Besi beton @ Rp 11,131.00 Rp 1,753,132.50 Rp 175,313.25 Rp 1,928,445.75
2.25000 Kg Kawat beton @ Rp 25,000.00 Rp 56,250.00 Rp 5,625.00 Rp 61,875.00
336.00000 Kg Semen PC @ Rp 1,340.00 Rp 450,240.00 Rp 45,024.00 Rp 495,264.00
0.54000 m3 Pasir Beton @ Rp 87,500.00 Rp 47,250.00 Rp 4,725.00 Rp 51,975.00
0.81000 m3 Batu pecah 2/3 @ Rp 415,000.00 Rp 336,150.00 Rp 33,615.00 Rp 369,765.00
Upah
5.30000 Oh Pekerja @ Rp 114,800.00 Rp 608,440.00 Rp 60,844.00 Rp 669,284.00
0.27500 Oh Tukang Batu @ Rp 160,300.00 Rp 44,082.50 Rp 4,408.25 Rp 48,490.75
1.30000 Oh Tukang Kayu @ Rp 160,300.00 Rp 208,390.00 Rp 20,839.00 Rp 229,229.00
1.05000 Oh Tukang Besi @ Rp 160,300.00 Rp 168,315.00 Rp 16,831.50 Rp 185,146.50
0.26200 Oh Kepala Tukang @ Rp 183,400.00 Rp 48,050.80 Rp 4,805.08 Rp 52,855.88
0.26500 Oh Mandor Lapangan @ Rp 228,900.00 Rp 60,658.50 Rp 6,065.85 Rp 66,724.35
3 MEMBUAT SLOOF BETON BERTULANG (200 kg besi + Bekesting) M3 Rp 5,476,193.14
A.4.1.1.29 Bahan
0.27000 m3 Kayu klas IV Papan @ Rp 1,500,000.00 Rp 405,000.00 Rp 40,500.00 Rp 445,500.00
2.00000 Kg Paku 2"-5" @ Rp 18,000.00 Rp 36,000.00 Rp 3,600.00 Rp 39,600.00
210.00000 Kg Besi beton @ Rp 11,131.00 Rp 2,337,510.00 Rp 233,751.00 Rp 2,571,261.00
3.00000 Kg Kawat beton @ Rp 25,000.00 Rp 75,000.00 Rp 7,500.00 Rp 82,500.00
336.00000 Kg Semen PC @ Rp 1,340.00 Rp 450,240.00 Rp 45,024.00 Rp 495,264.00
0.54000 m3 Pasir Beton @ Rp 87,500.00 Rp 47,250.00 Rp 4,725.00 Rp 51,975.00
0.81000 m3 Batu pecah 2/3 @ Rp 415,000.00 Rp 336,150.00 Rp 33,615.00 Rp 369,765.00
Upah
5.65000 Oh Pekerja @ Rp 114,800.00 Rp 648,620.00 Rp 64,862.00 Rp 713,482.00
0.27500 Oh Tukang Batu @ Rp 160,300.00 Rp 44,082.50 Rp 4,408.25 Rp 48,490.75
1.56000 Oh Tukang Kayu @ Rp 160,300.00 Rp 250,068.00 Rp 25,006.80 Rp 275,074.80
1.40000 Oh Tukang Besi @ Rp 160,300.00 Rp 224,420.00 Rp 22,442.00 Rp 246,862.00
0.32300 Oh Kepala Tukang @ Rp 183,400.00 Rp 59,238.20 Rp 5,923.82 Rp 65,162.02
0.28300 Oh Mandor Lapangan @ Rp 228,900.00 Rp 64,778.70 Rp 6,477.87 Rp 71,256.57
4 MEMBUAT DINDING BETON BERTULANG (200 kg besi + Bekesting) M3 Rp 6,260,493.14
A.4.1.1.34 Bahan
0.25000 m3 Kayu klas IV Papan @ Rp 1,500,000.00 Rp 375,000.00 Rp 37,500.00 Rp 412,500.00
3.00000 Kg Paku 2"-5" @ Rp 18,000.00 Rp 54,000.00 Rp 5,400.00 Rp 59,400.00
210.00000 Kg Besi beton @ Rp 11,131.00 Rp 2,337,510.00 Rp 233,751.00 Rp 2,571,261.00
3.00000 Kg Kawat beton @ Rp 25,000.00 Rp 75,000.00 Rp 7,500.00 Rp 82,500.00
336.00000 Kg Semen PC @ Rp 1,340.00 Rp 450,240.00 Rp 45,024.00 Rp 495,264.00
0.54000 m3 Pasir Beton Rp 87,500.00 Rp 47,250.00 Rp 4,725.00 Rp 51,975.00
0.81000 m3 Batu pecah 2/3 Rp 415,000.00 Rp 336,150.00 Rp 33,615.00 Rp 369,765.00
0.10500 m3 Kayu Kelas III Rp 2,000,000.00 Rp 210,000.00 Rp 21,000.00 Rp 231,000.00
2.50000 Lembar Plywood 9mm @ Rp 150,000.00 Rp 375,000.00 Rp 37,500.00 Rp 412,500.00
14.00000 Btg Dolken Ø 8-10 Cm @ Rp 10,000.00 Rp 140,000.00 Rp 14,000.00 Rp 154,000.00
Upah
5.65000 Oh Pekerja @ Rp 114,800.00 Rp 648,620.00 Rp 64,862.00 Rp 713,482.00
0.27500 Oh Tukang Batu @ Rp 160,300.00 Rp 44,082.50 Rp 4,408.25 Rp 48,490.75
1.56000 Oh Tukang Kayu @ Rp 160,300.00 Rp 250,068.00 Rp 25,006.80 Rp 275,074.80
1.40000 Oh Tukang Besi @ Rp 160,300.00 Rp 224,420.00 Rp 22,442.00 Rp 246,862.00
0.32300 Oh Kepala Tukang @ Rp 183,400.00 Rp 59,238.20 Rp 5,923.82 Rp 65,162.02
0.28300 Oh Mandor Lapangan @ Rp 228,900.00 Rp 64,778.70 Rp 6,477.87 Rp 71,256.57
5 MEMBUAT KOLOM BETON BERTULANG (300 kg besi + Bekesting) M3 Rp 10,734,530.84
A.4.1.1.30 Bahan
0.40000 m3 Kayu klas IV Papan @ Rp 1,500,000.00 Rp 600,000.00 Rp 60,000.00 Rp 660,000.00
4.00000 Kg Paku 2"-5" @ Rp 18,000.00 Rp 72,000.00 Rp 7,200.00 Rp 79,200.00
315.00000 Kg Besi beton @ Rp 11,131.00 Rp 3,506,265.00 Rp 350,626.50 Rp 3,856,891.50
4.50000 Kg Kawat beton @ Rp 25,000.00 Rp 112,500.00 Rp 11,250.00 Rp 123,750.00
336.00000 Kg Semen PC @ Rp 1,340.00 Rp 450,240.00 Rp 45,024.00 Rp 495,264.00
0.54000 m3 Pasir Beton @ Rp 87,500.00 Rp 47,250.00 Rp 4,725.00 Rp 51,975.00
0.81000 m3 Batu pecah 2/3 @ Rp 415,000.00 Rp 336,150.00 Rp 33,615.00 Rp 369,765.00
1.15000 m3 Kayu Kelas III Balok @ Rp 2,000,000.00 Rp 2,300,000.00 Rp 230,000.00 Rp 2,530,000.00
3.50000 Lbr Plywood 9mm @ Rp 150,000.00 Rp 525,000.00 Rp 52,500.00 Rp 577,500.00
20.00000 Btg Dolken Ø 8-10 Cm @ Rp 10,000.00 Rp 200,000.00 Rp 20,000.00 Rp 220,000.00
Upah
7.05000 Oh Pekerja @ Rp 114,800.00 Rp 809,340.00 Rp 80,934.00 Rp 890,274.00
0.27500 Oh Tukang Batu @ Rp 160,300.00 Rp 44,082.50 Rp 4,408.25 Rp 48,490.75
1.65000 Oh Tukang Kayu @ Rp 160,300.00 Rp 264,495.00 Rp 26,449.50 Rp 290,944.50
2.10000 Oh Tukang Besi @ Rp 160,300.00 Rp 336,630.00 Rp 33,663.00 Rp 370,293.00
0.40300 Oh Kepala Tukang @ Rp 183,400.00 Rp 73,910.20 Rp 7,391.02 Rp 81,301.22
0.35300 Oh Mandor Lapangan @ Rp 228,900.00 Rp 80,801.70 Rp 8,080.17 Rp 88,881.87
6 MEMBUAT BALOK BETON BERTULANG (200 kg besi + Bekesting) M3 Rp 6,643,548.89
A.4.1.1.31 Bahan
0.32000 m3 Kayu klas IV Papan @ Rp 1,500,000.00 Rp 480,000.00 Rp 48,000.00 Rp 528,000.00
3.20000 Kg Paku 2"-5" @ Rp 18,000.00 Rp 57,600.00 Rp 5,760.00 Rp 63,360.00
210.00000 Kg Besi beton @ Rp 11,131.00 Rp 2,337,510.00 Rp 233,751.00 Rp 2,571,261.00
3.00000 Kg Kawat beton @ Rp 25,000.00 Rp 75,000.00 Rp 7,500.00 Rp 82,500.00
336.00000 Kg Semen PC @ Rp 1,340.00 Rp 450,240.00 Rp 45,024.00 Rp 495,264.00
0.54000 m3 Pasir Beton @ Rp 87,500.00 Rp 47,250.00 Rp 4,725.00 Rp 51,975.00
0.81000 m3 Batu pecah 2/3 @ Rp 415,000.00 Rp 336,150.00 Rp 33,615.00 Rp 369,765.00
0.14000 m3 Kayu Kelas III Balok @ Rp 2,000,000.00 Rp 280,000.00 Rp 28,000.00 Rp 308,000.00
2.80000 Lbr Plywood 9mm @ Rp 150,000.00 Rp 420,000.00 Rp 42,000.00 Rp 462,000.00
16.00000 Btg Dolken Ø 8-10 Cm @ Rp 10,000.00 Rp 160,000.00 Rp 16,000.00 Rp 176,000.00
Upah
6.35000 Oh Pekerja @ Rp 114,800.00 Rp 728,980.00 Rp 72,898.00 Rp 801,878.00
0.27500 Oh Tukang Batu @ Rp 160,300.00 Rp 44,082.50 Rp 4,408.25 Rp 48,490.75
1.65000 Oh Tukang Kayu @ Rp 160,300.00 Rp 264,495.00 Rp 26,449.50 Rp 290,944.50
1.40000 Oh Tukang Besi @ Rp 160,300.00 Rp 224,420.00 Rp 22,442.00 Rp 246,862.00
0.33300 Oh Kepala Tukang @ Rp 183,400.00 Rp 61,072.20 Rp 6,107.22 Rp 67,179.42
0.31800 Oh Mandor Lapangan @ Rp 228,900.00 Rp 72,790.20 Rp 7,279.02 Rp 80,069.22
7 MEMBUAT KOLOM BETON BERTULANG (150 kg besi + Bekesting) M3 Rp 5,829,020.45
A.4.1.1.32 Bahan
0.32000 m3 Kayu klas IV Papan @ Rp 1,500,000.00 Rp 480,000.00 Rp 48,000.00 Rp 528,000.00
3.20000 Kg Paku 2"-5" @ Rp 18,000.00 Rp 57,600.00 Rp 5,760.00 Rp 63,360.00
157.50000 Kg Besi beton @ Rp 11,131.00 Rp 1,753,132.50 Rp 175,313.25 Rp 1,928,445.75
2.25000 Kg Kawat beton @ Rp 25,000.00 Rp 56,250.00 Rp 5,625.00 Rp 61,875.00
336.00000 Kg Semen PC @ Rp 1,340.00 Rp 450,240.00 Rp 45,024.00 Rp 495,264.00
0.54000 m3 Pasir Beton @ Rp 87,500.00 Rp 47,250.00 Rp 4,725.00 Rp 51,975.00
0.81000 m3 Batu pecah 2/3 @ Rp 415,000.00 Rp 336,150.00 Rp 33,615.00 Rp 369,765.00
0.12000 m3 Kayu Kelas III Balok @ Rp 2,000,000.00 Rp 240,000.00 Rp 24,000.00 Rp 264,000.00
2.80000 Lbr Plywood 9mm @ Rp 150,000.00 Rp 420,000.00 Rp 42,000.00 Rp 462,000.00
32.00000 Btg Dolken Ø 8-10 Cm @ Rp 10,000.00 Rp 320,000.00 Rp 32,000.00 Rp 352,000.00
Upah
5.30000 Oh Pekerja @ Rp 114,800.00 Rp 608,440.00 Rp 60,844.00 Rp 669,284.00
0.27500 Oh Tukang Batu @ Rp 160,300.00 Rp 44,082.50 Rp 4,408.25 Rp 48,490.75
1.30000 Oh Tukang Kayu @ Rp 160,300.00 Rp 208,390.00 Rp 20,839.00 Rp 229,229.00
1.05000 Oh Tukang Besi @ Rp 160,300.00 Rp 168,315.00 Rp 16,831.50 Rp 185,146.50
0.26500 Oh Kepala Tukang @ Rp 183,400.00 Rp 48,601.00 Rp 4,860.10 Rp 53,461.10
0.26500 Oh Mandor Lapangan @ Rp 228,900.00 Rp 60,658.50 Rp 6,065.85 Rp 66,724.35
8 MEMBUAT KOLOM PRAKTIS BETON BERTULANG/ 11X11 CM M' Rp 99,974.05
A.4.1.1.35 Bahan
0.00200 m3 Kayu klas IV Papan @ Rp 1,500,000.00 Rp 3,000.00 Rp 300.00 Rp 3,300.00
0.01000 Kg Paku 2"-5" @ Rp 18,000.00 Rp 180.00 Rp 18.00 Rp 198.00
3.00000 Kg Besi beton @ Rp 11,131.00 Rp 33,393.00 Rp 3,339.30 Rp 36,732.30
0.45000 Kg Kawat beton @ Rp 25,000.00 Rp 11,250.00 Rp 1,125.00 Rp 12,375.00
4.00000 Kg Semen PC @ Rp 1,340.00 Rp 5,360.00 Rp 536.00 Rp 5,896.00
0.00600 Kg Pasir Beton @ Rp 87,500.00 Rp 525.00 Rp 52.50 Rp 577.50
0.00900 m3 Batu pecah 2/3 @ Rp 415,000.00 Rp 3,735.00 Rp 373.50 Rp 4,108.50
Upah
0.18000 Oh Pekerja @ Rp 114,800.00 Rp 20,664.00 Rp 2,066.40 Rp 22,730.40
0.02000 Oh Tukang Batu @ Rp 160,300.00 Rp 3,206.00 Rp 320.60 Rp 3,526.60
0.02000 Oh Tukang Kayu @ Rp 160,300.00 Rp 3,206.00 Rp 320.60 Rp 3,526.60
0.02000 Oh Tukang Besi @ Rp 160,300.00 Rp 3,206.00 Rp 320.60 Rp 3,526.60
0.00600 Oh Kepala Tukang @ Rp 183,400.00 Rp 1,100.40 Rp 110.04 Rp 1,210.44
0.00900 Oh Mandor Lapangan @ Rp 228,900.00 Rp 2,060.10 Rp 206.01 Rp 2,266.11
9 MEMBUAT RING BALOK PRAKTIS BETON BERTULANG/ 10X15 CM M' Rp 127,020.19
A.4.1.1.36 Bahan
0.00300 m3 Kayu klas IV Papan @ Rp 1,500,000.00 Rp 4,500.00 Rp 450.00 Rp 4,950.00
0.00200 Kg Paku 2"-5" @ Rp 18,000.00 Rp 36.00 Rp 3.60 Rp 39.60
3.60000 Kg Besi beton @ Rp 11,131.00 Rp 40,071.60 Rp 4,007.16 Rp 44,078.76
0.05000 Kg Kawat beton @ Rp 25,000.00 Rp 1,250.00 Rp 125.00 Rp 1,375.00
5.50000 Kg Semen PC @ Rp 1,340.00 Rp 7,370.00 Rp 737.00 Rp 8,107.00
0.00900 Kg Pasir Beton @ Rp 87,500.00 Rp 787.50 Rp 78.75 Rp 866.25
0.01500 m3 Batu pecah 2/3 @ Rp 415,000.00 Rp 6,225.00 Rp 622.50 Rp 6,847.50
Upah
0.29700 Oh Pekerja @ Rp 114,800.00 Rp 34,095.60 Rp 3,409.56 Rp 37,505.16
0.03300 Oh Tukang Batu @ Rp 160,300.00 Rp 5,289.90 Rp 528.99 Rp 5,818.89
0.03300 Oh Tukang Kayu @ Rp 160,300.00 Rp 5,289.90 Rp 528.99 Rp 5,818.89
0.03300 Oh Tukang Besi @ Rp 160,300.00 Rp 5,289.90 Rp 528.99 Rp 5,818.89
0.01000 Oh Kepala Tukang @ Rp 183,400.00 Rp 1,834.00 Rp 183.40 Rp 2,017.40
0.01500 Oh Mandor Lapangan @ Rp 228,900.00 Rp 3,433.50 Rp 343.35 Rp 3,776.85
10 PEMBESIAN DENGAN BESI POLOS (1 kg) KG Rp 14,329.67
A.4.1.1.17 Bahan
1.05000 kg Besi Beton (polos) @ Rp 10,027.83 Rp 10,529.22 Rp 1,052.92 Rp 11,582.14
0.01500 kg Kawat Beton @ Rp 25,000.00 Rp 375.00 Rp 37.50 Rp 412.50
Upah :
0.00700 Oh Pekerja @ Rp 114,800.00 Rp 803.60 Rp 80.36 Rp 883.96
0.00700 Oh Tukang Besi Besi @ Rp 160,300.00 Rp 1,122.10 Rp 112.21 Rp 1,234.31
0.00070 Oh Kepala Tukang @ Rp 183,400.00 Rp 128.38 Rp 12.84 Rp 141.22
0.00030 Oh Mandor Lapangan @ Rp 228,900.00 Rp 68.67 Rp 6.87 Rp 75.54
11 PEMBESIAN DENGAN BESI ULIR (1 kg) KG Rp 15,303.27
A.4.1.1.17 Bahan
1.05000 kg Besi Beton (ulir) @ Rp 10,870.77 Rp 11,414.31 Rp 1,141.43 Rp 12,555.74
0.01500 kg Kawat Beton @ Rp 25,000.00 Rp 375.00 Rp 37.50 Rp 412.50
Upah :
0.00700 Oh Pekerja @ Rp 114,800.00 Rp 803.60 Rp 80.36 Rp 883.96
0.00700 Oh Tukang Besi @ Rp 160,300.00 Rp 1,122.10 Rp 112.21 Rp 1,234.31
0.00070 Oh Kepala Tukang @ Rp 183,400.00 Rp 128.38 Rp 12.84 Rp 141.22
0.00030 Oh Mandor Lapangan @ Rp 228,900.00 Rp 68.67 Rp 6.87 Rp 75.54
12 PASANGAN BEKISTING UNTUK PONDASI M2 Rp 211,468.18
A.4.1.1.20 Bahan
0.04000 m3 Kayu Kelas III Kayu Terentang @ Rp 1,800,000.00 Rp 72,000.00 Rp 7,200.00 Rp 79,200.00
0.30000 kg Paku 2"- 5" @ Rp 18,000.00 Rp 5,400.00 Rp 540.00 Rp 5,940.00
0.10000 Ltr Minyak Solar Begisting @ Rp 27,500.00 Rp 2,750.00 Rp 275.00 Rp 3,025.00
m3 Kayu Kelas II Kayu Balok Terentang @ Rp 2,500,000.00 Rp - Rp - Rp -
Upah :
0.52000 Oh Pekerja @ Rp 114,800.00 Rp 59,696.00 Rp 5,969.60 Rp 65,665.60
0.26000 Oh Tukang Besi @ Rp 160,300.00 Rp 41,678.00 Rp 4,167.80 Rp 45,845.80
0.02600 Oh Kepala Tukang @ Rp 183,400.00 Rp 4,768.40 Rp 476.84 Rp 5,245.24
0.02600 Oh Mandor Lapangan @ Rp 228,900.00 Rp 5,951.40 Rp 595.14 Rp 6,546.54
13 PASANGAN BEKISTING UNTUK SLOOF M2 Rp 221,368.18
A.4.1.1.21 Bahan
0.04500 m3 Kayu Kelas III Kayu Terentang @ Rp 1,800,000.00 Rp 81,000.00 Rp 8,100.00 Rp 89,100.00
0.30000 kg Paku 2"- 5" @ Rp 18,000.00 Rp 5,400.00 Rp 540.00 Rp 5,940.00
0.10000 Ltr Minyak Solar Begisting @ Rp 27,500.00 Rp 2,750.00 Rp 275.00 Rp 3,025.00
m3 Kayu Kelas II Kayu Balok Terentang @ Rp - Rp - Rp - Rp -
Upah :
0.52000 Oh Pekerja @ Rp 114,800.00 Rp 59,696.00 Rp 5,969.60 Rp 65,665.60
0.26000 Oh Tukang Besi @ Rp 160,300.00 Rp 41,678.00 Rp 4,167.80 Rp 45,845.80
0.02600 Oh Kepala Tukang @ Rp 183,400.00 Rp 4,768.40 Rp 476.84 Rp 5,245.24
0.02600 Oh Mandor Lapangan @ Rp 228,900.00 Rp 5,951.40 Rp 595.14 Rp 6,546.54
14 PASANGAN BEKISTING UNTUK KOLOM M2 Rp 370,670.19
A.4.1.1.22 Bahan
0.04000 m3 Kayu Kelas III Kayu Terentang @ Rp 1,800,000.00 Rp 72,000.00 Rp 7,200.00 Rp 79,200.00
0.40000 kg Paku 2"- 5" @ Rp 18,000.00 Rp 7,200.00 Rp 720.00 Rp 7,920.00
0.20000 Ltr Minyak Solar Begisting @ Rp 27,500.00 Rp 5,500.00 Rp 550.00 Rp 6,050.00
0.01500 m3 Kayu Kelas II Kayu Balok Terentang @ Rp 2,500,000.00 Rp 37,500.00 Rp 3,750.00 Rp 41,250.00
0.35000 lbr Plywood 9 mm @ Rp 150,000.00 Rp 52,500.00 Rp 5,250.00 Rp 57,750.00
2.00000 Btg Dolken Ø 8-10 Cm @ Rp 10,000.00 Rp 20,000.00 Rp 2,000.00 Rp 22,000.00
Upah :
0.66000 Oh Pekerja @ Rp 114,800.00 Rp 75,768.00 Rp 7,576.80 Rp 83,344.80
0.33000 Oh Tukang Besi @ Rp 160,300.00 Rp 52,899.00 Rp 5,289.90 Rp 58,188.90
0.03300 Oh Kepala Tukang @ Rp 183,400.00 Rp 6,052.20 Rp 605.22 Rp 6,657.42
0.03300 Oh Mandor Lapangan @ Rp 228,900.00 Rp 7,553.70 Rp 755.37 Rp 8,309.07
15 PASANGAN BEKISTING UNTUK BALOK M2 Rp 378,920.19
A.4.1.1.23 Bahan
0.04000 m3 Kayu Kelas III Kayu Terentang @ Rp 1,800,000.00 Rp 72,000.00 Rp 7,200.00 Rp 79,200.00
0.40000 kg Paku 2"- 5" @ Rp 18,000.00 Rp 7,200.00 Rp 720.00 Rp 7,920.00
0.20000 Ltr Minyak Solar Begisting @ Rp 27,500.00 Rp 5,500.00 Rp 550.00 Rp 6,050.00
0.01800 m3 Kayu Kelas II Kayu Balok Terentang @ Rp 2,500,000.00 Rp 45,000.00 Rp 4,500.00 Rp 49,500.00
0.35000 lbr Plywood 9 mm @ Rp 150,000.00 Rp 52,500.00 Rp 5,250.00 Rp 57,750.00
2.00000 Btg Dolken Ø 8-10 Cm @ Rp 10,000.00 Rp 20,000.00 Rp 2,000.00 Rp 22,000.00
Upah :
0.66000 Oh Pekerja @ Rp 114,800.00 Rp 75,768.00 Rp 7,576.80 Rp 83,344.80
0.33000 Oh Tukang Kayu Besi @ Rp 160,300.00 Rp 52,899.00 Rp 5,289.90 Rp 58,188.90
0.03300 Oh Kepala Tukang @ Rp 183,400.00 Rp 6,052.20 Rp 605.22 Rp 6,657.42
0.03300 Oh Mandor Lapangan @ Rp 228,900.00 Rp 7,553.70 Rp 755.37 Rp 8,309.07
16 PASANGAN BEKISTING UNTUK PLAT M2 Rp 414,670.19
A.4.1.1.24 Bahan
0.04000 m3 Kayu Kelas III Kayu Terentang @ Rp 1,800,000.00 Rp 72,000.00 Rp 7,200.00 Rp 79,200.00
0.40000 kg Paku 2"- 5" @ Rp 18,000.00 Rp 7,200.00 Rp 720.00 Rp 7,920.00
0.20000 Ltr Minyak Solar Begisting @ Rp 27,500.00 Rp 5,500.00 Rp 550.00 Rp 6,050.00
0.01500 m3 Kayu Kelas II Kayu Balok Terentang @ Rp 2,500,000.00 Rp 37,500.00 Rp 3,750.00 Rp 41,250.00
0.35000 lbr Plywood 9 mm @ Rp 150,000.00 Rp 52,500.00 Rp 5,250.00 Rp 57,750.00
6.00000 Btg Dolken Ø 8-10 Cm @ Rp 10,000.00 Rp 60,000.00 Rp 6,000.00 Rp 66,000.00
Upah :
0.66000 Oh Pekerja @ Rp 114,800.00 Rp 75,768.00 Rp 7,576.80 Rp 83,344.80
0.33000 Oh Tukang Besi @ Rp 160,300.00 Rp 52,899.00 Rp 5,289.90 Rp 58,188.90
0.03300 Oh Kepala Tukang @ Rp 183,400.00 Rp 6,052.20 Rp 605.22 Rp 6,657.42
0.03300 Oh Mandor Lapangan @ Rp 228,900.00 Rp 7,553.70 Rp 755.37 Rp 8,309.07
( 9 ) PEKERJAAN BAJA
1 PEMASANGAN 1 KG KG Rp 41,627.41
A.4.2.1.2 Bahan
1.15000 kg Besi Baja @ Rp 17,000.00 Rp 19,550.00 Rp 1,955.00 Rp 21,505.00
Upah :
0.06000 Oh Pekerja @ Rp 114,800.00 Rp 6,888.00 Rp 688.80 Rp 7,576.80
0.06000 Oh Tukang @ Rp 160,300.00 Rp 9,618.00 Rp 961.80 Rp 10,579.80
0.00600 Oh Kepala Tukang @ Rp 183,400.00 Rp 1,100.40 Rp 110.04 Rp 1,210.44
0.00300 Oh Mandor Lapangan @ Rp 228,900.00 Rp 686.70 Rp 68.67 Rp 755.37
2 PENGERJAAN 100 KG PEKERJAAN PERAKITAN KG Rp 269,321.69
A.4.2.1.3 Bahan
1.00000 Ltr Solar @ Rp 12,500.00 Rp 12,500.00 Rp 1,250.00 Rp 13,750.00
0.10000 Ltr Minyak Pelumas @ Rp 35,000.00 Rp 3,500.00 Rp 350.00 Rp 3,850.00
0.80000 Jam Sewa Alat @ Rp 250,000.00 Rp 200,000.00 Rp 20,000.00 Rp 220,000.00
Upah
0.10000 Oh Pekerja @ Rp 114,800.00 Rp 11,480.00 Rp 1,148.00 Rp 12,628.00
0.10000 Oh Tukang @ Rp 160,300.00 Rp 16,030.00 Rp 1,603.00 Rp 17,633.00
0.00100 Oh Kepala Tukang @ Rp 183,400.00 Rp 183.40 Rp 18.34 Rp 201.74
0.00500 Oh Mandor Lapangan @ Rp 228,900.00 Rp 1,144.50 Rp 114.45 Rp 1,258.95
3 PENGERJAAN 1 M2 PINTU PLAT BAJA TEBAL 2 MM RANGKAP, RANGKA BAJA SIKU-SIKU M2 Rp 1,247,361.28
A.4.2.1.4 Bahan
15.00000 Kg Besi Siku L 30.30.3 @ Rp 17,000.00 Rp 255,000.00 Rp 25,500.00 Rp 280,500.00
32.80000 Kg Besi Plat Baja @ Rp 17,000.00 Rp 557,600.00 Rp 55,760.00 Rp 613,360.00
0.05000 Kg Kawat Las @ Rp 27,000.00 Rp 1,350.00 Rp 135.00 Rp 1,485.00
Upah
1.05000 Oh Pekerja @ Rp 114,800.00 Rp 120,540.00 Rp 12,054.00 Rp 132,594.00
1.05000 Oh Tukang @ Rp 160,300.00 Rp 168,315.00 Rp 16,831.50 Rp 185,146.50
0.10500 Oh Kepala Tukang @ Rp 183,400.00 Rp 19,257.00 Rp 1,925.70 Rp 21,182.70
0.05200 Oh Mandor Lapangan @ Rp 228,900.00 Rp 11,902.80 Rp 1,190.28 Rp 13,093.08
( 10 ) PEKERJAAN SANITASI
1 MEMASANG 1 m' Pipa PVC TIPE AW DIAMETER 3/4" M' Rp 20,036.78
A.5.1.1.26 Bahan
1.20000 m' Pipa PVC ø 3/4 " AW @ Rp 1,875.00 Rp 2,250.00 Rp 225.00 Rp 2,475.00
0.35000 h-pipa perlengkapan @ Rp 1,875.00 Rp 656.25 Rp 65.63 Rp 721.88
Upah :
0.03600 Oh Pekerja @ Rp 114,800.00 Rp 4,132.80 Rp 413.28 Rp 4,546.08
0.06000 Oh Tukang Pipa @ Rp 160,300.00 Rp 9,618.00 Rp 961.80 Rp 10,579.80
0.00600 Oh Kepala Tukang @ Rp 183,400.00 Rp 1,100.40 Rp 110.04 Rp 1,210.44
0.00200 Oh Mandor Lapangan @ Rp 228,900.00 Rp 457.80 Rp 45.78 Rp 503.58
2 MEMASANG 1 m' PIPA PVC TIPE AW DIAMETER 1/2" M' Rp 19,077.71
A.5.1.1.25 Bahan
1.20000 m' Pipa PVC ø 1/2 " AW @ Rp 1,312.50 Rp 1,575.00 Rp 157.50 Rp 1,732.50
0.35000 H-pipa Perlengkapan @ Rp 1,312.50 Rp 459.38 Rp 45.94 Rp 505.31
Upah
0.03600 Oh Pekerja @ Rp 114,800.00 Rp 4,132.80 Rp 413.28 Rp 4,546.08
0.06000 Oh Tukang Pipa @ Rp 160,300.00 Rp 9,618.00 Rp 961.80 Rp 10,579.80
0.00600 Oh Kepala Tukang @ Rp 183,400.00 Rp 1,100.40 Rp 110.04 Rp 1,210.44
0.00200 Oh Mandor Lapangan @ Rp 228,900.00 Rp 457.80 Rp 45.78 Rp 503.58
3 MEMASANG 1 m' PIPA PVC TIPE AW DIAMETER 1" M' Rp 20,889.28
A.5.1.1.27 Bahan
1.20000 m' Pipa PVC 1" x 4 m' @ Rp 2,375.00 Rp 2,850.00 Rp 285.00 Rp 3,135.00
0.35000 H-pipa Perlengkapan @ Rp 2,375.00 Rp 831.25 Rp 83.13 Rp 914.38
Upah :
0.03600 Oh Pekerja @ Rp 114,800.00 Rp 4,132.80 Rp 413.28 Rp 4,546.08
0.06000 Oh Tukang Pipa @ Rp 160,300.00 Rp 9,618.00 Rp 961.80 Rp 10,579.80
0.00600 Oh Kepala Tukang @ Rp 183,400.00 Rp 1,100.40 Rp 110.04 Rp 1,210.44
0.00200 Oh Mandor Lapangan @ Rp 228,900.00 Rp 457.80 Rp 45.78 Rp 503.58
4 MEMASANG 1 m' PIPA PVC TIPE AW DIAMETER 1,5" M' Rp 31,653.60
A.5.1.1.28 Bahan
1.20000 m' Pipa PVC 1,5" x 4 m' @ Rp 3,750.00 Rp 4,500.00 Rp 450.00 Rp 4,950.00
0.35000 H-pipa Perlengkapan @ Rp 3,750.00 Rp 1,312.50 Rp 131.25 Rp 1,443.75
Upah :
0.05400 Oh Pekerja @ Rp 114,800.00 Rp 6,199.20 Rp 619.92 Rp 6,819.12
0.09000 Oh Tukang Pipa @ Rp 160,300.00 Rp 14,427.00 Rp 1,442.70 Rp 15,869.70
0.00900 Oh Kepala Tukang @ Rp 183,400.00 Rp 1,650.60 Rp 165.06 Rp 1,815.66
0.00300 Oh Mandor Lapangan @ Rp 228,900.00 Rp 686.70 Rp 68.67 Rp 755.37
5 MEMASANG 1 m' PIPA PVC TIPE AW DIAMETER 2" M' Rp 32,506.10
A.5.1.1.29 Bahan
1.20000 m' Pipa PVC 2" x 4 m' @ Rp 4,250.00 Rp 5,100.00 Rp 510.00 Rp 5,610.00
0.35000 H-pipa Perlengkapan @ Rp 4,250.00 Rp 1,487.50 Rp 148.75 Rp 1,636.25
Upah :
0.05400 Oh Pekerja @ Rp 114,800.00 Rp 6,199.20 Rp 619.92 Rp 6,819.12
0.09000 Oh Tukang Pipa @ Rp 160,300.00 Rp 14,427.00 Rp 1,442.70 Rp 15,869.70
0.00900 Oh Kepala Tukang @ Rp 183,400.00 Rp 1,650.60 Rp 165.06 Rp 1,815.66
0.00300 Oh Mandor Lapangan @ Rp 228,900.00 Rp 686.70 Rp 68.67 Rp 755.37
6 MEMASANG 1 m' PIPA PVC TIPE AW DIAMETER 3" M' Rp 53,748.26
A.5.1.1.31 Bahan
1.20000 m' Pipa PVC 3" x 4 m' @ Rp 9,375.00 Rp 11,250.00 Rp 1,125.00 Rp 12,375.00
0.35000 H-pipa Perlengkapan @ Rp 9,375.00 Rp 3,281.25 Rp 328.13 Rp 3,609.38
Upah :
0.08100 Oh Pekerja @ Rp 114,800.00 Rp 9,298.80 Rp 929.88 Rp 10,228.68
0.13500 Oh Tukang Pipa @ Rp 160,300.00 Rp 21,640.50 Rp 2,164.05 Rp 23,804.55
0.01350 Oh Kepala Tukang @ Rp 183,400.00 Rp 2,475.90 Rp 247.59 Rp 2,723.49
0.00400 Oh Mandor Lapangan @ Rp 228,900.00 Rp 915.60 Rp 91.56 Rp 1,007.16
7 MEMASANG 1 m' PIPA PVC TIPE AW DIAMETER 4"- 6" M' Rp 65,683.26
A.5.1.1.32 Bahan
1.20000 m' Pipa PVC 4"- 6"x 4 m' @ Rp 16,375.00 Rp 19,650.00 Rp 1,965.00 Rp 21,615.00
0.35000 H-pipa Perlengkapan @ Rp 16,375.00 Rp 5,731.25 Rp 573.13 Rp 6,304.38
Upah
0.08100 Oh Pekerja @ Rp 114,800.00 Rp 9,298.80 Rp 929.88 Rp 10,228.68
0.13500 Oh Tukang Pipa @ Rp 160,300.00 Rp 21,640.50 Rp 2,164.05 Rp 23,804.55
0.01350 Oh Kepala Tukang @ Rp 183,400.00 Rp 2,475.90 Rp 247.59 Rp 2,723.49
0.00400 Oh Mandor Lapangan @ Rp 228,900.00 Rp 915.60 Rp 91.56 Rp 1,007.16
8 MEMASANG 1 bh KRAN BH Rp 108,760.85
A.5.1.1.19 Upah
1.00000 Bh Kran air @ Rp 25,000.00 Rp 25,000.00 Rp 2,500.00 Rp 27,500.00
0.02500 Bh Seal tape @ Rp 5,000.00 Rp 125.00 Rp 12.50 Rp 137.50
Upah
0.01000 Oh Pekerja @ Rp 114,800.00 Rp 1,148.00 Rp 114.80 Rp 1,262.80
0.40000 Oh Tukang Pipa @ Rp 160,300.00 Rp 64,120.00 Rp 6,412.00 Rp 70,532.00
0.04000 Oh Kepala Tukang @ Rp 183,400.00 Rp 7,336.00 Rp 733.60 Rp 8,069.60
0.00500 Oh Mandor Lapangan @ Rp 228,900.00 Rp 1,144.50 Rp 114.45 Rp 1,258.95
9 MEMASANG 1 BUAH KLOSET JONGKOK BH Rp 1,144,168.30
A.5.1.1.1 Bahan
1.00000 Bh Closed Jongkok @ Rp 421,250.00 Rp 421,250.00 Rp 42,125.00 Rp 463,375.00
0.06000 H-Kloset Perlengkapan @ Rp 421,250.00 Rp 25,275.00 Rp 2,527.50 Rp 27,802.50
Upah
3.30000 Oh Pekerja @ Rp 114,800.00 Rp 378,840.00 Rp 37,884.00 Rp 416,724.00
1.10000 Oh Tukang @ Rp 160,300.00 Rp 176,330.00 Rp 17,633.00 Rp 193,963.00
0.01000 Oh Kepala Tukang @ Rp 183,400.00 Rp 1,834.00 Rp 183.40 Rp 2,017.40
0.16000 Oh Mandor Lapangan @ Rp 228,900.00 Rp 36,624.00 Rp 3,662.40 Rp 40,286.40
10 MEMASANG 1 BH BAK CUCI STAINLES STEEL BH Rp 380,016.45
A.5.1.1.12 Bahan
1.00000 Bh Bak cuci stainless steel @ Rp 250,000.00 Rp 250,000.00 Rp 25,000.00 Rp 275,000.00
1.00000 Set Water drain + Asesories @ Rp 35,000.00 Rp 35,000.00 Rp 3,500.00 Rp 38,500.00
Upah
0.03000 Oh Pekerja @ Rp 114,800.00 Rp 3,444.00 Rp 344.40 Rp 3,788.40
0.30000 Oh Tukang @ Rp 160,300.00 Rp 48,090.00 Rp 4,809.00 Rp 52,899.00
0.03000 Oh Kepala Tukang @ Rp 183,400.00 Rp 5,502.00 Rp 550.20 Rp 6,052.20
0.01500 Oh Mandor Lapangan @ Rp 228,900.00 Rp 3,433.50 Rp 343.35 Rp 3,776.85
11 MEMASANG 1 bh KRAN LEHER ANGSA BH Rp 713,760.85
DH.10.11 Bahan
1.00000 Bh Kran Leher angsa ex. Toto @ Rp 575,000.00 Rp 575,000.00 Rp 57,500.00 Rp 632,500.00
0.02500 Bh Seal tape @ Rp 5,000.00 Rp 125.00 Rp 12.50 Rp 137.50
Upah
0.01000 Oh Pekerja @ Rp 114,800.00 Rp 1,148.00 Rp 114.80 Rp 1,262.80
0.40000 Oh Tukang @ Rp 160,300.00 Rp 64,120.00 Rp 6,412.00 Rp 70,532.00
0.04000 Oh Kepala Tukang @ Rp 183,400.00 Rp 7,336.00 Rp 733.60 Rp 8,069.60
0.00500 Oh Mandor Lapangan @ Rp 228,900.00 Rp 1,144.50 Rp 114.45 Rp 1,258.95
12 MEMASANG 1 bh FLOOR DRAIN BH Rp 60,672.15
A.5.1.1.14 Bahan
1.00000 Bh Floor Drain Stainless @ Rp 35,000.00 Rp 35,000.00 Rp 3,500.00 Rp 38,500.00
Upah
0.01000 Oh Pekerja @ Rp 114,800.00 Rp 1,148.00 Rp 114.80 Rp 1,262.80
0.10000 Oh Tukang @ Rp 160,300.00 Rp 16,030.00 Rp 1,603.00 Rp 17,633.00
0.01000 Oh Kepala Tukang @ Rp 183,400.00 Rp 1,834.00 Rp 183.40 Rp 2,017.40
0.00500 Oh Mandor Lapangan @ Rp 228,900.00 Rp 1,144.50 Rp 114.45 Rp 1,258.95

13 MEMASANG 1 BH BAK MANDI TERASO VOL. 0,3 M3 BH Rp 2,039,763.00


A.5.1.1.9 Bahan
1.0000 Bh Bak Mandi Vol. 0,3 m3 @ Rp 235,000.00 Rp 235,000.00 Rp 23,500.00 Rp 258,500.00
12.00000 % Perlengkapan @ Rp 28,200.00 Rp 338,400.00 Rp 33,840.00 Rp 372,240.00
Upah
3.00000 Oh Pekerja @ Rp 114,800.00 Rp 344,400.00 Rp 34,440.00 Rp 378,840.00
4.50000 Oh Tukang @ Rp 160,300.00 Rp 721,350.00 Rp 72,135.00 Rp 793,485.00
0.05000 Oh Kepala Tukang @ Rp 183,400.00 Rp 9,170.00 Rp 917.00 Rp 10,087.00
0.90000 Oh Mandor Lapangan @ Rp 228,900.00 Rp 206,010.00 Rp 20,601.00 Rp 226,611.00
( 11 ) PEKERJAAN PENUTUP DINDING
1 PEMASANGAN DINDING KERAMIK 30 X 60 M2 Rp 292,640.81
DH.11.1 Bahan :
5.50000 bh Keramik 30 x 60 @ Rp 31,818.18 Rp 175,000.00 Rp 17,500.00 Rp 192,500.00
9.60000 kg Semen (PC) @ Rp 1,340.00 Rp 12,864.00 Rp 1,286.40 Rp 14,150.40
0.04500 m3 Pasir Pasangan @ Rp 87,500.00 Rp 3,937.50 Rp 393.75 Rp 4,331.25
1.50000 kg Semen Warna @ Rp 15,000.00 Rp 22,500.00 Rp 2,250.00 Rp 24,750.00
Upah :
0.24000 Oh Pekerja @ Rp 114,800.00 Rp 27,552.00 Rp 2,755.20 Rp 30,307.20
0.12000 Oh Tukang Batu @ Rp 160,300.00 Rp 19,236.00 Rp 1,923.60 Rp 21,159.60
0.01200 Oh Kepala Tukang @ Rp 183,400.00 Rp 2,200.80 Rp 220.08 Rp 2,420.88
0.01200 Oh Mandor Lapangan @ Rp 228,900.00 Rp 2,746.80 Rp 274.68 Rp 3,021.48
( 12 ) PEKERJAAN LANTAI
1 PEMASANGAN LANTAI KERAMIK 20 X 20 ANTI SLIP M2 Rp 268,970.90
DH.12.1 Bahan :
1.05000 m2 Kramik 20 x 20, anti slip @ Rp 65,000.00 Rp 68,250.00 Rp 6,825.00 Rp 75,075.00
10.40000 kg Semen (PC) @ Rp 1,340.00 Rp 13,936.00 Rp 1,393.60 Rp 15,329.60
0.04500 m3 Pasir Beton/Pasangan @ Rp 87,500.00 Rp 3,937.50 Rp 393.75 Rp 4,331.25
0.50000 kg Semen Warna @ Rp 15,000.00 Rp 7,500.00 Rp 750.00 Rp 8,250.00
Upah :
0.70000 Oh Pekerja @ Rp 114,800.00 Rp 80,360.00 Rp 8,036.00 Rp 88,396.00
0.35000 Oh Tukang Batu @ Rp 160,300.00 Rp 56,105.00 Rp 5,610.50 Rp 61,715.50
0.03500 Oh Kepala Tukang @ Rp 183,400.00 Rp 6,419.00 Rp 641.90 Rp 7,060.90
0.03500 Oh Mandor Lapangan @ Rp 228,900.00 Rp 8,011.50 Rp 801.15 Rp 8,812.65
2 PEMASANGAN LANTAI KERAMIK 60 X 60 CORAK M2 Rp 302,265.81
DH.12.2 Bahan :
1.05000 m2 Keramik 60 x 60 @ Rp 175,000.00 Rp 183,750.00 Rp 18,375.00 Rp 202,125.00
9.60000 kg Semen (PC) @ Rp 1,340.00 Rp 12,864.00 Rp 1,286.40 Rp 14,150.40
0.04500 m3 Pasir Beton/Pasangan @ Rp 87,500.00 Rp 3,937.50 Rp 393.75 Rp 4,331.25
1.50000 kg Semen Warna @ Rp 15,000.00 Rp 22,500.00 Rp 2,250.00 Rp 24,750.00
Upah :
0.24000 Oh Pekerja @ Rp 114,800.00 Rp 27,552.00 Rp 2,755.20 Rp 30,307.20
0.12000 Oh Tukang Batu @ Rp 160,300.00 Rp 19,236.00 Rp 1,923.60 Rp 21,159.60
0.01200 Oh Kepala Tukang @ Rp 183,400.00 Rp 2,200.80 Rp 220.08 Rp 2,420.88
0.01200 Oh Mandor Lapangan @ Rp 228,900.00 Rp 2,746.80 Rp 274.68 Rp 3,021.48
3 PEMASANGAN LANTAI KERAMIK 40 x 40 CORAK M2 Rp 163,258.59
DH.12.3 Bahan :
1.05000 m2 Keramik 40 x 40 Corak @ Rp 55,000.00 Rp 57,750.00 Rp 5,775.00 Rp 63,525.00
9.80000 kg Semen (PC) @ Rp 1,340.00 Rp 13,132.00 Rp 1,313.20 Rp 14,445.20
0.04500 m3 Pasir Beton/Pasangan @ Rp 87,500.00 Rp 3,937.50 Rp 393.75 Rp 4,331.25
1.30000 kg Semen Warna @ Rp 15,000.00 Rp 19,500.00 Rp 1,950.00 Rp 21,450.00
Upah :
0.25000 Oh Pekerja @ Rp 114,800.00 Rp 28,700.00 Rp 2,870.00 Rp 31,570.00
0.12500 Oh Tukang Batu @ Rp 160,300.00 Rp 20,037.50 Rp 2,003.75 Rp 22,041.25
0.01300 Oh Kepala Tukang @ Rp 183,400.00 Rp 2,384.20 Rp 238.42 Rp 2,622.62
0.01300 Oh Mandor Lapangan @ Rp 228,900.00 Rp 2,975.70 Rp 297.57 Rp 3,273.27

4 PEMASANGAN LANTAI KERAMIK 30 x 30 CORAK M2 Rp 262,606.30


DH.12.4 Bahan :
1.05000 m2 Keramik 30 x 30 Corak @ Rp 60,000.00 Rp 63,000.00 Rp 6,300.00 Rp 69,300.00
10.00000 kg Semen (PC) @ Rp 1,340.00 Rp 13,400.00 Rp 1,340.00 Rp 14,740.00
0.04500 m3 Pasir Beton/Pasangan @ Rp 87,500.00 Rp 3,937.50 Rp 393.75 Rp 4,331.25
0.50000 kg Semen Warna @ Rp 15,000.00 Rp 7,500.00 Rp 750.00 Rp 8,250.00
Upah :
0.70000 Oh Pekerja @ Rp 114,800.00 Rp 80,360.00 Rp 8,036.00 Rp 88,396.00
0.35000 Oh Tukang Batu @ Rp 160,300.00 Rp 56,105.00 Rp 5,610.50 Rp 61,715.50
0.03500 Oh Kepala Tukang @ Rp 183,400.00 Rp 6,419.00 Rp 641.90 Rp 7,060.90
0.03500 Oh Mandor Lapangan @ Rp 228,900.00 Rp 8,011.50 Rp 801.15 Rp 8,812.65
( 13 ) PEKERJAAN PENGECATAN
1 Pengecatan Bidang Kayu/Besi Baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup) M2 Rp 75,754.58
A. 4.7.1.5 Bahan
0.20000 Kg Cat Meni @ Rp 45,000.00 Rp 9,000.00 Rp 900.00 Rp 9,900.00
0.15000 Kg Plamir kayu @ Rp 12,000.00 Rp 1,800.00 Rp 180.00 Rp 1,980.00
0.17000 Kg Cat Dasar 1x @ Rp 57,000.00 Rp 9,690.00 Rp 969.00 Rp 10,659.00
0.35000 Kg Cat Penutup3x @ Rp 57,000.00 Rp 19,950.00 Rp 1,995.00 Rp 21,945.00
0.01000 bh Kuas @ Rp 30,000.00 Rp 300.00 Rp 30.00 Rp 330.00
0.03000 ltr Pengencer @ Rp 8,000.00 Rp 240.00 Rp 24.00 Rp 264.00
0.20000 Lbr Ampelas @ Rp 8,000.00 Rp 1,600.00 Rp 160.00 Rp 1,760.00
Upah
0.07000 Oh Pekerja @ Rp 114,800.00 Rp 8,036.00 Rp 803.60 Rp 8,839.60
0.10500 Oh Tukang Cat @ Rp 160,300.00 Rp 16,831.50 Rp 1,683.15 Rp 18,514.65
0.00400 Oh Kepala Tukang @ Rp 183,400.00 Rp 733.60 Rp 73.36 Rp 806.96
0.00300 Oh Mandor Lapangan @ Rp 228,900.00 Rp 686.70 Rp 68.67 Rp 755.37
2 PENGECETAN TEMBOK BARU INTERIOR (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) M2 Rp 60,084.83
A. 4.7.1.10 Bahan
0.10000 Kg Plamir @ Rp 45,000.00 Rp 4,500.00 Rp 450.00 Rp 4,950.00
0.10000 Kg Cat Tembok interior dasar @ Rp 100,000.00 Rp 10,000.00 Rp 1,000.00 Rp 11,000.00
0.26000 Kg Cat Tembok interior Penutup 2x @ Rp 100,000.00 Rp 26,000.00 Rp 2,600.00 Rp 28,600.00
Upah
0.02000 Oh Pekerja @ Rp 114,800.00 Rp 2,296.00 Rp 229.60 Rp 2,525.60
0.06300 Oh Tukang Cat @ Rp 160,300.00 Rp 10,098.90 Rp 1,009.89 Rp 11,108.79
0.00630 Oh Kepala Tukang @ Rp 183,400.00 Rp 1,155.42 Rp 115.54 Rp 1,270.96
0.00250 Oh Mandor Lapangan @ Rp 228,900.00 Rp 572.25 Rp 57.23 Rp 629.48
3 PENGECETAN TEMBOK BARU EKSTERIOR (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) M2 Rp 48,204.83
A. 4.7.1.10 Bahan
0.10000 Kg Plamir @ Rp 45,000.00 Rp 4,500.00 Rp 450.00 Rp 4,950.00
0.10000 Kg Cat Tembok Eksterior @ Rp 70,000.00 Rp 7,000.00 Rp 700.00 Rp 7,700.00
0.26000 Kg Cat Tembok Eksterior Penutup 2x @ Rp 70,000.00 Rp 18,200.00 Rp 1,820.00 Rp 20,020.00
Upah
0.02000 Oh Pekerja @ Rp 114,800.00 Rp 2,296.00 Rp 229.60 Rp 2,525.60
0.06300 Oh Tukang Cat @ Rp 160,300.00 Rp 10,098.90 Rp 1,009.89 Rp 11,108.79
0.00630 Oh Kepala Tukang @ Rp 183,400.00 Rp 1,155.42 Rp 115.54 Rp 1,270.96
0.00250 Oh Mandor Lapangan @ Rp 228,900.00 Rp 572.25 Rp 57.23 Rp 629.48
( 14 ) PEKERJAAN KUNCI & KACA
1 PASANG KACA, TEBAL 5 CM M2 Rp 251,296.23
A.4.6.2.17 Bahan
1.10000 m2 Kaca 5 mm @ Rp 180,000.00 Rp 198,000.00 Rp 19,800.00 Rp 217,800.00
0.05000 Tube Sealant @ Rp 35,000.00 Rp 1,750.00 Rp 175.00 Rp 1,925.00
Upah
0.01500 Oh Pekerja @ Rp 114,800.00 Rp 1,722.00 Rp 172.20 Rp 1,894.20
0.15000 Oh Tukang @ Rp 160,300.00 Rp 24,045.00 Rp 2,404.50 Rp 26,449.50
0.01500 Oh Kepala Tukang @ Rp 183,400.00 Rp 2,751.00 Rp 275.10 Rp 3,026.10
0.00080 Oh Mandor Lapangan @ Rp 228,900.00 Rp 183.12 Rp 18.31 Rp 201.43
2 PASANG KUNCI TANAM BH Rp 232,773.75
A.4.6.2.2 Bahan
1.00000 Bh Kunci tanam ex. Dexon @ Rp 120,000.00 Rp 120,000.00 Rp 12,000.00 Rp 132,000.00
Upah
0.01000 Oh Pekerja @ Rp 114,800.00 Rp 1,148.00 Rp 114.80 Rp 1,262.80
0.50000 Oh Tukang @ Rp 160,300.00 Rp 80,150.00 Rp 8,015.00 Rp 88,165.00
0.05000 Oh Kepala Tukang @ Rp 183,400.00 Rp 9,170.00 Rp 917.00 Rp 10,087.00
0.00500 Oh Mandor Lapangan @ Rp 228,900.00 Rp 1,144.50 Rp 114.45 Rp 1,258.95
3 PASANG KUNCI TANAM KAMAR MANDI BH Rp 231,638.77
A. 4.6.2.3 Bahan
1.00000 Bh Kunci tanam 1 x putar Kamar Mandi @ Rp 120,000.00 Rp 120,000.00 Rp 12,000.00 Rp 132,000.00
Upah
0.00500 Oh Pekerja @ Rp 114,800.00 Rp 574.00 Rp 57.40 Rp 631.40
0.50000 Oh Tukang @ Rp 160,300.00 Rp 80,150.00 Rp 8,015.00 Rp 88,165.00
0.05000 Oh Kepala Tukang @ Rp 183,400.00 Rp 9,170.00 Rp 917.00 Rp 10,087.00
0.00300 Oh Mandor Lapangan @ Rp 228,900.00 Rp 686.70 Rp 68.67 Rp 755.37
4 PASANG ENGSEL PINTU BH Rp 57,421.23
A.4.6.2.5 Bahan
1.00000 Bh Engsel kuningan @ Rp 23,500.00 Rp 23,500.00 Rp 2,350.00 Rp 25,850.00
Upah
0.01500 Oh Pekerja @ Rp 114,800.00 Rp 1,722.00 Rp 172.20 Rp 1,894.20
0.15000 Oh Tukang @ Rp 160,300.00 Rp 24,045.00 Rp 2,404.50 Rp 26,449.50
0.01500 Oh Kepala Tukang @ Rp 183,400.00 Rp 2,751.00 Rp 275.10 Rp 3,026.10
0.00080 Oh Mandor Lapangan @ Rp 228,900.00 Rp 183.12 Rp 18.31 Rp 201.43
5 PASANG KUNCI SLOT BH Rp 55,828.19
A.4.6.2.11 Bahan
1.00000 Bh Kunci Selot @ Rp 12,500.00 Rp 12,500.00 Rp 1,250.00 Rp 13,750.00
Upah
0.02000 Oh Pekerja @ Rp 114,800.00 Rp 2,296.00 Rp 229.60 Rp 2,525.60
0.20000 Oh Tukang @ Rp 160,300.00 Rp 32,060.00 Rp 3,206.00 Rp 35,266.00
0.02000 Oh Kepala Tukang @ Rp 183,400.00 Rp 3,668.00 Rp 366.80 Rp 4,034.80
0.00100 Oh Mandor Lapangan @ Rp 228,900.00 Rp 228.90 Rp 22.89 Rp 251.79
6 PASANG KAIT ANGIN BH Rp 42,571.23
A.4.6.2.9 Bahan
1.00000 Bh Kait angin @ Rp 10,000.00 Rp 10,000.00 Rp 1,000.00 Rp 11,000.00
Upah
0.01500 Oh Pekerja @ Rp 114,800.00 Rp 1,722.00 Rp 172.20 Rp 1,894.20
0.15000 Oh Tukang @ Rp 160,300.00 Rp 24,045.00 Rp 2,404.50 Rp 26,449.50
0.01500 Oh Kepala Tukang @ Rp 183,400.00 Rp 2,751.00 Rp 275.10 Rp 3,026.10
0.00080 Oh Mandor Lapangan @ Rp 228,900.00 Rp 183.12 Rp 18.31 Rp 201.43
7 KACA CERMIN TEBAL 8 MM M2 Rp 2.00 Rp 275,384.12
A. 4.6.2.20 Bahan
1.10000 m2 Kaca Cermin 8 mm @ Rp 200,000.00 Rp 220,000.00 Rp 22,000.00 Rp 242,000.00
Upah
0.01500 Oh Pekerja @ Rp 114,800.00 Rp 1,722.00 Rp 172.20 Rp 1,894.20
0.15000 Oh Tukang @ Rp 160,300.00 Rp 24,045.00 Rp 2,404.50 Rp 26,449.50
0.01500 Oh Kepala Tukang @ Rp 183,400.00 Rp 2,751.00 Rp 275.10 Rp 3,026.10
0.00800 Oh Mandor Lapangan @ Rp 228,900.00 Rp 1,831.20 Rp 183.12 Rp 2,014.32
( 15 ) PEKERJAAN INSTALASI LISTRIK
1 1 TTK PEMASANGAN INSTALASI LAMPU & SAKLAR TTK Rp 171,474.16
DH.15.1 Bahan
6.00000 m' NYM 3x 2,5 mm2 @ Rp 14,747.60 Rp 88,485.60 Rp 8,848.56 Rp 97,334.16
1.00000 btng Pipa High Impact, dia. 1/2 " @ Rp 11,400.00 Rp 11,400.00 Rp 1,140.00 Rp 12,540.00
Upah :
1.00000 Ls Upah @ Rp 56,000.00 Rp 56,000.00 Rp 5,600.00 Rp 61,600.00
2 1 SET PEMASANGAN LAMPU TL.LED 218 SET Rp 352,000.00
DH.15.2 Bahan
1.00000 set Lampu TL LED 2x18 Watt (Lengkap) @ Rp 300,000.00 Rp 300,000.00 Rp 30,000.00 Rp 330,000.00
Upah :
1.00000 Ls Upah @ Rp 20,000.00 Rp 20,000.00 Rp 2,000.00 Rp 22,000.00
3 1 SET PEMASANGAN LAMPU DL. 18 SET Rp 102,300.00
DH.15.3 Bahan
1.00000 set Lampu DL LED 18 Watt (Lengkap) @ Rp 73,000.00 Rp 73,000.00 Rp 7,300.00 Rp 80,300.00
Upah :
1.00000 Ls Upah @ Rp 20,000.00 Rp 20,000.00 Rp 2,000.00 Rp 22,000.00
4 1 BH PEMASANGAN SAKLAR TUNGGAL BH Rp 26,301.00
DH.15.4 Bahan
1.00000 set Saklar Tunggal @ Rp 13,910.00 Rp 13,910.00 Rp 1,391.00 Rp 15,301.00
Upah :
1.00000 Ls Upah @ Rp 10,000.00 Rp 10,000.00 Rp 1,000.00 Rp 11,000.00
5 1 BH PEMASANGAN SAKLAR GANDA BH Rp 34,540.00
DH.15.5 Bahan
1.00000 set Saklar Ganda @ Rp 21,400.00 Rp 21,400.00 Rp 2,140.00 Rp 23,540.00
Upah :
1.00000 Ls Upah @ Rp 10,000.00 Rp 10,000.00 Rp 1,000.00 Rp 11,000.00
6 1 BH PEMASANGAN GROUND ROD BH Rp 990,000.00
DH.15.6 Bahan
1.00000 btng Round Cooper dia. 5/8 ", 2 M' @ Rp 750,000.00 Rp 750,000.00 Rp 75,000.00 Rp 825,000.00
Upah :
1.00000 Ls Upah @ Rp 150,000.00 Rp 150,000.00 Rp 15,000.00 Rp 165,000.00
( 16 ) PEKERJAAN LANSKAP
1 1 M3 PENGURUGAN DENGAN PASIR URUG M3 Rp 106,401.90
A.2.3.1.11 Bahan
1.20000 m3 Pasir Urug @ Rp 50,000.00 Rp 60,000.00 Rp 6,000.00 Rp 66,000.00
Upah :
0.30000 Oh Pekerja @ Rp 114,800.00 Rp 34,440.00 Rp 3,444.00 Rp 37,884.00
0.01000 Oh Mandor Lapangan @ Rp 228,900.00 Rp 2,289.00 Rp 228.90 Rp 2,517.90
2 1 M3 PENGURUGAN KEMBALI GALIAN TANAH M3 Rp 75,729.50
A.2.3.1.9
Upah :
0.50000 Oh Pekerja @ Rp 114,800.00 Rp 57,400.00 Rp 5,740.00 Rp 63,140.00
0.05000 Oh Mandor Lapangan @ Rp 228,900.00 Rp 11,445.00 Rp 1,144.50 Rp 12,589.50
3 1 M3 PONDASI BATU BELAH CAMPURAN 1SP : 4PP M3 Rp 1,193,794.25
A.3.2.1.2 Bahan
1.20000 m3 Batu Belah @ Rp 415,000.00 Rp 498,000.00 Rp 49,800.00 Rp 547,800.00
163.00000 Kg Semen Portland @ Rp 1,340.00 Rp 218,420.00 Rp 21,842.00 Rp 240,262.00
0.52000 m3 Pasir Pasang @ Rp 87,500.00 Rp 45,500.00 Rp 4,550.00 Rp 50,050.00
Upah :
1.50000 Oh Tukang @ Rp 114,800.00 Rp 172,200.00 Rp 17,220.00 Rp 189,420.00
0.75000 Oh Pekerja @ Rp 160,300.00 Rp 120,225.00 Rp 12,022.50 Rp 132,247.50
0.07500 Oh Kepala Tukang @ Rp 183,400.00 Rp 13,755.00 Rp 1,375.50 Rp 15,130.50
0.07500 Oh Mandor Lapangan @ Rp 228,900.00 Rp 17,167.50 Rp 1,716.75 Rp 18,884.25
4 1 M2 PEMASANGAN PAVINGBLOCK M2 Rp 143,092.40
DH.16.4 Bahan
1.00000 m2 Pavingblock @ Rp 95,000.00 Rp 95,000.00 Rp 9,500.00 Rp 104,500.00
Upah :
0.16000 Oh Tukang @ Rp 114,800.00 Rp 18,368.00 Rp 1,836.80 Rp 20,204.80
0.05000 Oh Pekerja @ Rp 160,300.00 Rp 8,015.00 Rp 801.50 Rp 8,816.50
0.01000 Oh Kepala Tukang @ Rp 183,400.00 Rp 1,834.00 Rp 183.40 Rp 2,017.40
0.03000 Oh Mandor Lapangan @ Rp 228,900.00 Rp 6,867.00 Rp 686.70 Rp 7,553.70
5 1 M3 PENGURUGAN DENGAN SIRTU PADAT M3 Rp 392,587.25
A.2.3.1.14 Bahan
1.20000 m3 Sirtu @ Rp 259,250.00 Rp 311,100.00 Rp 31,110.00 Rp 342,210.00
Upah :
0.25000 Oh Pekerja @ Rp 160,300.00 Rp 40,075.00 Rp 4,007.50 Rp 44,082.50
0.02500 Oh Mandor Lapangan @ Rp 228,900.00 Rp 5,722.50 Rp 572.25 Rp 6,294.75
6 1 M3 PASANGAN BATU KOSONG ANSTAMPING M3 Rp 756,514.77
A.3.3.1.9 Bahan
1.20000 m3 Batu Belah @ Rp 415,000.00 Rp 498,000.00 Rp 49,800.00 Rp 547,800.00
0.43200 m3 Pasir Urug @ Rp 50,000.00 Rp 21,600.00 Rp 2,160.00 Rp 23,760.00
Upah :
0.78000 Oh Tukang @ Rp 114,800.00 Rp 89,544.00 Rp 8,954.40 Rp 98,498.40
0.39000 Oh Pekerja @ Rp 160,300.00 Rp 62,517.00 Rp 6,251.70 Rp 68,768.70
0.03900 Oh Kepala Tukang @ Rp 183,400.00 Rp 7,152.60 Rp 715.26 Rp 7,867.86
0.03900 Oh Mandor Lapangan @ Rp 228,900.00 Rp 8,927.10 Rp 892.71 Rp 9,819.81
7 1 M PASANG KANSTIN M' Rp 115,844.19
DH.16.7 Bahan
2.50000 bh Kanstin Taman 40 x 20 x 10 @ Rp 23,000.00 Rp 57,500.00 Rp 5,750.00 Rp 63,250.00
4.00000 Kg Semen Portland @ Rp 1,340.00 Rp 5,360.00 Rp 536.00 Rp 5,896.00
0.01600 m3 Pasir Pasang @ Rp 87,500.00 Rp 1,400.00 Rp 140.00 Rp 1,540.00
Upah :
0.20000 Oh Tukang @ Rp 114,800.00 Rp 22,960.00 Rp 2,296.00 Rp 25,256.00
0.10000 Oh Pekerja @ Rp 160,300.00 Rp 16,030.00 Rp 1,603.00 Rp 17,633.00
0.01000 Oh Kepala Tukang @ Rp 183,400.00 Rp 1,834.00 Rp 183.40 Rp 2,017.40
0.00100 Oh Mandor Lapangan @ Rp 228,900.00 Rp 228.90 Rp 22.89 Rp 251.79
ANALISA PINTU JENDELA

0 : JASA KONSULTAN PERENCANAAN PEMBANGUNAN GEDUNG SISTEM RESI GUDANG (SRG)


Lokasi : : DESA NAMANG, KEC. NAMANG, KAB. BANGKA TENGAH

Bahan/ Harga upah dan Jumlah = Koefisien x


No. Koofisien Sat Uraian Keterangan KODE @ Overhead 10% Total
Upah Bahan Harga

a b c d e f g h i j=cxi k = j x (10% s/d 15%) l=j+k

PEKERJAAN KUSEN & PINTU JENDELA

1 1 UNIT JALUSI + KAWAT HARMONIKA RANGKAP unit Rp 2,123,807.98


DH.PJ.1 Bahan
12.10000 m' Besi Hollow 40 x 40 x 1,8 mm @ Rp 9,363.00 Rp 113,292.30 Rp 11,329.23 Rp 124,621.53
19.20000 m' Besi Hollow 40 x 20 x 1,8 mm @ Rp 8,226.00 Rp 157,939.20 Rp 15,793.92 Rp 173,733.12
5.76000 m2 Pas. Kawat Harmonika @ Rp 30,000.00 Rp 172,800.00 Rp 17,280.00 Rp 190,080.00
5.96800 m2 Pek. Pengecatan Besi A. 4.7.1.5 @ Rp 75,754.58 Rp 452,103.33 Rp 452,103.33

Upah :
1.00000 ls Upah kerja + pasang + Aksesoris @ Rp 1,075,700.00 Rp 1,075,700.00 Rp 107,570.00 Rp 1,183,270.00

2 1 UNIT KUSEN & DAUN PINTU KAYU P1 (DOUBLE PINTU) KK unit Rp 3,748,203.55
DH.PJ.2
0.02256 m3 KUSEN PINTU DAN JENDELA kusen A. 4.6.1.2 @ Rp 7,708,789.00 Rp 173,910.28 Rp 17,391.03 Rp 191,301.31
2.52000 m2 PASANGAN PINTU TEAKWOOD RANGKAP/ RANGKA KAYU daun pintu A. 4.6.1.11 @ Rp 752,517.70 Rp 1,896,344.60 Rp 189,634.46 Rp 2,085,979.06
2.00000 bh PASANG KUNCI TANAM A.4.6.2.2 @ Rp 232,773.75 Rp 465,547.50 Rp 46,554.75 Rp 512,102.25
6.00000 bh Pasang Engsel Pintu A.4.6.2.5 @ Rp 57,421.23 Rp 344,527.39 Rp 34,452.74 Rp 378,980.13

Upah :
1.00000 ls Upah kerja + pasang + Aksesoris @ Rp 527,128.00 Rp 527,128.00 Rp 52,712.80 Rp 579,840.80

3 1 UNIT KUSEN & DAUN PINTU KAYU P2 (SINGLEPINTU) KK unit Rp 2,287,390.35


DH.PJ.3
0.02040 m3 KUSEN PINTU DAN JENDELA kusen A. 4.6.1.2 @ Rp 7,708,789.00 Rp 157,259.30 Rp 15,725.93 Rp 172,985.23
1.64000 m2 PASANGAN PINTU TEAKWOOD RANGKAP/ RANGKA KAYU daun pintu A. 4.6.1.11 @ Rp 752,517.70 Rp 1,234,129.03 Rp 123,412.90 Rp 1,357,541.93
1.00000 bh PASANG KUNCI TANAM A.4.6.2.2 @ Rp 232,773.75 Rp 232,773.75 Rp 23,277.38 Rp 256,051.13
3.00000 bh Pasang Engsel Pintu A.4.6.2.5 @ Rp 57,421.23 Rp 172,263.70 Rp 17,226.37 Rp 189,490.07
Upah :
1.00000 ls Upah kerja + pasang + Aksesoris @ Rp 283,020.00 Rp 283,020.00 Rp 28,302.00 Rp 311,322.00

4 1 UNIT KUSEN & DAUN PINTU KAYU P1 (SINGLEPINTU) RP unit Rp 2,098,594.89


DH.PJ.4
0.02000 m3 KUSEN PINTU DAN JENDELA kusen A. 4.6.1.2 @ Rp 7,708,789.00 Rp 154,175.78 Rp 15,417.58 Rp 169,593.36
1.43000 m2 PASANGAN PINTU TEAKWOOD RANGKAP/ RANGKA KAYU daun pintu A. 4.6.1.11 @ Rp 752,517.70 Rp 1,076,100.31 Rp 107,610.03 Rp 1,183,710.34
1.00000 bh PASANG KUNCI TANAM A.4.6.2.2 @ Rp 232,773.75 Rp 232,773.75 Rp 23,277.38 Rp 256,051.13
3.00000 bh Pasang Engsel Pintu A.4.6.2.5 @ Rp 57,421.23 Rp 172,263.70 Rp 17,226.37 Rp 189,490.07
Upah :
1.00000 ls Upah kerja + pasang + Aksesoris @ Rp 272,500.00 Rp 272,500.00 Rp 27,250.00 Rp 299,750.00

5 1 UNIT KUSEN & DAUN JENDELA ALUMUNIUM J1 KK unit Rp 1,305,858.84


DH.PJ.5 Bahan
3.72000 m' Kusen Alumunium 4" Coklat kusen @ Rp 100,045.00 Rp 372,167.40 Rp 37,216.74 Rp 409,384.14
3.00000 m' Kusen Alumunium 3" Coklat Daun jendela @ Rp 88,275.00 Rp 264,825.00 Rp 26,482.50 Rp 291,307.50
3.00000 m' Karet @ Rp 3,300.00 Rp 9,900.00 Rp 990.00 Rp 10,890.00
0.50000 tube Sealant @ Rp 35,000.00 Rp 17,500.00 Rp 1,750.00 Rp 19,250.00
1.00000 bh Rambuncis @ Rp 12,000.00 Rp 12,000.00 Rp 1,200.00 Rp 13,200.00
0.28160 m2 Kaca 5 mm @ Rp 180,000.00 Rp 50,688.00 Rp 5,068.80 Rp 55,756.80

Upah :
1.00000 ls Upah kerja + pasang + Aksesoris @ Rp 460,064.00 Rp 460,064.00 Rp 46,006.40 Rp 506,070.40

6 1 UNIT KUSEN & DAUN JENDELA ALUMUNIUM J2 KK unit Rp 1,419,844.69


DH.PJ.6 Bahan
4.12000 m' Kusen Alumunium 4" Coklat kusen @ Rp 100,045.00 Rp 412,185.40 Rp 41,218.54 Rp 453,403.94
3.10000 m' Kusen Alumunium 3" Coklat Daun jendela @ Rp 88,275.00 Rp 273,652.50 Rp 27,365.25 Rp 301,017.75
3.10000 m' Karet @ Rp 3,300.00 Rp 10,230.00 Rp 1,023.00 Rp 11,253.00
0.50000 tube Sealant @ Rp 35,000.00 Rp 17,500.00 Rp 1,750.00 Rp 19,250.00
1.00000 bh Rambuncis @ Rp 12,000.00 Rp 12,000.00 Rp 1,200.00 Rp 13,200.00
0.42000 m2 Kaca 5 mm @ Rp 180,000.00 Rp 75,600.00 Rp 7,560.00 Rp 83,160.00

Upah :
1.00000 ls Upah kerja + pasang + Aksesoris @ Rp 489,600.00 Rp 489,600.00 Rp 48,960.00 Rp 538,560.00

7 1 UNIT KUSEN & DAUN JENDELA ALUMUNIUM J1 RP unit Rp 2,861,235.30


DH.PJ.7 Bahan
7.20000 m' Kusen Alumunium 4" Coklat kusen @ Rp 100,045.00 Rp 720,324.00 Rp 72,032.40 Rp 792,356.40
6.92000 m' Kusen Alumunium 3" Coklat Daun jendela @ Rp 88,275.00 Rp 610,863.00 Rp 61,086.30 Rp 671,949.30
6.92000 m' Karet @ Rp 3,300.00 Rp 22,836.00 Rp 2,283.60 Rp 25,119.60
0.50000 tube Sealant @ Rp 35,000.00 Rp 17,500.00 Rp 1,750.00 Rp 19,250.00
2.00000 bh Rambuncis @ Rp 12,000.00 Rp 24,000.00 Rp 2,400.00 Rp 26,400.00
1.20000 m2 Kaca 5 mm @ Rp 180,000.00 Rp 216,000.00 Rp 21,600.00 Rp 237,600.00

Upah :
1.00000 ls Upah kerja + pasang + Aksesoris @ Rp 989,600.00 Rp 989,600.00 Rp 98,960.00 Rp 1,088,560.00

8 1 UNIT KUSEN & DAUN JENDELA ALUMUNIUM J2 RP unit Rp 2,739,982.30


DH.PJ.8 Bahan
7.40000 m' Kusen Alumunium 4" Coklat kusen @ Rp 100,045.00 Rp 740,333.00 Rp 74,033.30 Rp 814,366.30
5.60000 m' Kusen Alumunium 3" Coklat Daun jendela @ Rp 88,275.00 Rp 494,340.00 Rp 49,434.00 Rp 543,774.00
8.40000 m' Karet @ Rp 3,300.00 Rp 27,720.00 Rp 2,772.00 Rp 30,492.00
0.50000 tube Sealant @ Rp 35,000.00 Rp 17,500.00 Rp 1,750.00 Rp 19,250.00
2.00000 bh Rambuncis @ Rp 12,000.00 Rp 24,000.00 Rp 2,400.00 Rp 26,400.00
1.05000 m2 Kaca 5 mm @ Rp 180,000.00 Rp 189,000.00 Rp 18,900.00 Rp 207,900.00

Upah :
1.00000 ls Upah kerja + pasang + Aksesoris @ Rp 998,000.00 Rp 998,000.00 Rp 99,800.00 Rp 1,097,800.00

9 1 UNIT KUSEN & DAUN JENDELA ALUMUNIUM J3 RP unit Rp 910,249.45


DH.PJ.9 Bahan
3.90000 m' Kusen Alumunium 4" Coklat kusen @ Rp 100,045.00 Rp 390,175.50 Rp 39,017.55 Rp 429,193.05
3.68000 m' Karet @ Rp 3,300.00 Rp 12,144.00 Rp 1,214.40 Rp 13,358.40
0.50000 tube Sealant @ Rp 35,000.00 Rp 17,500.00 Rp 1,750.00 Rp 19,250.00
0.38400 m2 Kaca 5 mm @ Rp 180,000.00 Rp 69,120.00 Rp 6,912.00 Rp 76,032.00

Upah :
1.00000 ls Upah kerja + pasang + Aksesoris @ Rp 338,560.00 Rp 338,560.00 Rp 33,856.00 Rp 372,416.00

10 1 UNIT BV ALUMUNIUM BV unit Rp 384,319.10


DH.PJ.10 Bahan
1.80000 m' Kusen Alumunium 4" Coklat kusen @ Rp 100,045.00 Rp 180,081.00 Rp 18,008.10 Rp 198,089.10
0.50000 tube Sealant @ Rp 35,000.00 Rp 17,500.00 Rp 1,750.00 Rp 19,250.00
0.16000 m2 Kaca 5 mm @ Rp 180,000.00 Rp 28,800.00 Rp 2,880.00 Rp 31,680.00

Upah :
1.00000 ls Upah kerja + pasang + Aksesoris @ Rp 123,000.00 Rp 123,000.00 Rp 12,300.00 Rp 135,300.00

11 1 UNIT KUSEN & DAUN JENDELA ALUMUNIUM PJ unit Rp 1,192,328.94


DH.PJ.11 Bahan
4.32000 m' Kusen Alumunium 4" Coklat kusen @ Rp 100,045.00 Rp 432,194.40 Rp 43,219.44 Rp 475,413.84
1.88000 m' Kusen Alumunium 3" Coklat Daun jendela @ Rp 88,275.00 Rp 165,957.00 Rp 16,595.70 Rp 182,552.70
1.88000 m' Karet @ Rp 3,300.00 Rp 6,204.00 Rp 620.40 Rp 6,824.40
0.50000 tube Sealant @ Rp 35,000.00 Rp 17,500.00 Rp 1,750.00 Rp 19,250.00
1.00000 bh Rambuncis @ Rp 12,000.00 Rp 12,000.00 Rp 1,200.00 Rp 13,200.00
0.30400 m2 Kaca 5 mm @ Rp 180,000.00 Rp 54,720.00 Rp 5,472.00 Rp 60,192.00

Upah :
1.00000 ls Upah kerja + pasang + Aksesoris @ Rp 395,360.00 Rp 395,360.00 Rp 39,536.00 Rp 434,896.00
12 1 UNIT KUSEN & DAUN PINTU ALUMUNIUM PJ unit Rp 2,333,415.42
DH.PJ.12 Bahan
5.22000 m' Kusen Alumunium 4" Coklat kusen @ Rp 100,045.00 Rp 522,234.90 Rp 52,223.49 Rp 574,458.39
3.04000 m2 Besi plat aluminum T= 1mm Daun Pintu @ Rp 144,985.00 Rp 440,754.40 Rp 44,075.44 Rp 484,829.84
4.00000 m' Karet @ Rp 3,300.00 Rp 13,200.00 Rp 1,320.00 Rp 14,520.00
0.50000 tube Sealant @ Rp 35,000.00 Rp 17,500.00 Rp 1,750.00 Rp 19,250.00
0.32000 m2 Kaca 5 mm @ Rp 123,000.00 Rp 39,360.00 Rp 3,936.00 Rp 43,296.00
1.00000 bh Pasang Kunci A.4.6.2.2 @ Rp 232,773.75 Rp 232,773.75 Rp 23,277.38 Rp 256,051.13
3.00000 bh Pasang Engsel Pintu A.4.6.2.5 @ Rp 57,421.23 Rp 172,263.70 Rp 17,226.37 Rp 189,490.07

Upah :
1.00000 ls Upah kerja + pasang + Aksesoris @ Rp 683,200.00 Rp 683,200.00 Rp 68,320.00 Rp 751,520.00

13 1 UNIT PINTU BESI UTAMA RG unit Rp 2,393,543.70


DH.PH.13 Bahan
5.00000 m' Besi Hollow 40 x 40 x 1,8 mm @ Rp 9,363.00 Rp 46,815.00 Rp 4,681.50 Rp 51,496.50
10.52000 m' Besi Hollow 40 x 20 x 1,8 mm @ Rp 8,226.00 Rp 86,537.52 Rp 8,653.75 Rp 95,191.27
23.22000 m' Besi Hollow 20 x 20 x 1,2 mm @ Rp 9,166.00 Rp 212,834.52 Rp 21,283.45 Rp 234,117.97
1.00000 bh Handle Pintu Lengkap @ Rp 250,000.00 Rp 250,000.00 Rp 25,000.00 Rp 275,000.00
3.92000 m2 Pek. Pengecetan Besi A. 4.7.1.5 @ Rp 75,754.58 Rp 296,957.95 Rp 296,957.95

Upah :
1.00000 ls Upah kerja + pasang + Aksesoris @ Rp 1,309,800.00 Rp 1,309,800.00 Rp 130,980.00 Rp 1,440,780.00

14 1 UNIT BV BESI RG unit Rp 496,274.46


DH.PJ.14 Bahan
2.80000 m' Besi Hollow 40 x 40 x 1,8 mm @ Rp 9,363.00 Rp 26,216.40 Rp 2,621.64 Rp 28,838.04
6.21720 kg Plat Besi 2mm @ Rp 11,417.00 Rp 70,981.77 Rp 7,098.18 Rp 78,079.95
0.84400 m2 Pek. Pengecetan Besi A.4.6.2.5 @ Rp 75,754.58 Rp 63,936.87 Rp 63,936.87

Upah :
1.00000 ls Upah kerja + pasang + Aksesoris @ Rp 295,836.00 Rp 295,836.00 Rp 29,583.60 Rp 325,419.60

15 1 UNIT RAILING PAGAR BESI unit Rp 1,301,608.20


DH.PJ.15 Bahan
15.86000 m' Besi Hollow 40 x 40 x 1,8 mm @ Rp 9,363.00 Rp 148,497.18 Rp 14,849.72 Rp 163,346.90
9.60000 m' Besi Hollow 20 x 20 x 1,2 mm @ Rp 9,166.00 Rp 87,993.60 Rp 8,799.36 Rp 96,792.96
3.30560 m2 Pek. Pengecetan Besi A.4.6.2.5 @ Rp 75,754.58 Rp 250,414.34 Rp 250,414.34

Upah :
1.00000 ls Upah kerja + pasang + Aksesoris @ Rp 719,140.00 Rp 719,140.00 Rp 71,914.00 Rp 791,054.00

16 1 UNIT PAGAR BESI GESER unit Rp 8,351,290.69


DH.PJ.16 Bahan
86.80000 m' Besi hollow 20.20.1,2 @ Rp 9,166.00 Rp 795,608.80 Rp 79,560.88 Rp 875,169.68
29.80000 m' Besi hollow 40.40.1,8 @ Rp 9,363.00 Rp 279,017.40 Rp 27,901.74 Rp 306,919.14
5.32000 m2 Besi plat aluminum T= 1mm @ Rp 144,985.00 Rp 771,320.20 Rp 77,132.02 Rp 848,452.22
28.74400 m2 Pengecetan Besi A.4.6.2.5 @ Rp 75,754.58 Rp 2,177,489.65 Rp 2,177,489.65
Upah :
1.00000 ls Upah kerja + pasang + Aksesoris @ Rp 3,766,600.00 Rp 3,766,600.00 Rp 376,660.00 Rp 4,143,260.00

17 1 UNIT PINTU FIBER WC unit Rp 442,379.30


DH.PJ.17 Bahan
1.00000 Unit Pintu Fiber WC @ Rp 252,163.00 Rp 252,163.00 Rp 25,216.30 Rp 277,379.30
Upah :
1.00000 ls Upah kerja + pasang + Aksesoris @ Rp 150,000.00 Rp 150,000.00 Rp 15,000.00 Rp 165,000.00

18 1 M' PASANG TALANG AIR unit Rp 472,821.64


DH.PJ.18 Bahan
5.09000 m' Besi hollow 40.40.1,8 @ Rp 9,363.00 Rp 47,657.67 Rp 4,765.77 Rp 52,423.44
1.05000 m2 Besi Pelat Alumunium T = 1mm @ Rp 144,985.00 Rp 152,234.25 Rp 15,223.43 Rp 167,457.68
0.81440 m2 Pengecetan Besi A.4.6.2.5 @ Rp 75,754.58 Rp 61,694.53 Rp 61,694.53
Upah :
1.00000 ls Upah kerja + pasang + Aksesoris @ Rp 173,860.00 Rp 173,860.00 Rp 17,386.00 Rp 191,246.00
ANALISA PANEL LISTRIK

0 : JASA KONSULTAN PERENCANAAN PEMBANGUNAN GEDUNG SISTEM RESI GUDANG (SRG)


Lokasi : : DESA NAMANG, KEC. NAMANG, KAB. BANGKA TENGAH

NO URAIAN PEKERJAAN VOL. SAT HAR. SAT JUMLAH OVERHEAD 10 % TOTAL

1 PANEL LISTRIK GUDANG 3,045,075.00


DH.PL.1 MCCB 50 A, 3 pole 1 bh 550,000.00 550,000.00 55,000.00 605,000.00
MCB 6 A, 1 pole 4 bh 65,000.00 260,000.00 26,000.00 286,000.00
MCB 10 A, 1 pole 1 bh 65,000.00 65,000.00 6,500.00 71,500.00
Pilot Lamp 3 set 10,000.00 30,000.00 3,000.00 33,000.00
Fuse Pilot Lamp 3 set 10,000.00 30,000.00 3,000.00 33,000.00
Busbar 5 x ( 20 x 3 mm ) 1 set 820,000.00 820,000.00 82,000.00 902,000.00
Panel Kosong uk. 80 x 60 x 25 cm 1 set 750,000.00 750,000.00 75,000.00 825,000.00
Ongkos Pasang & stel 1 lot 263,250.00 263,250.00 26,325.00 289,575.00

2 PANEL LISTRIK KANTOR KARYAWAN 2,962,850.00


DH.PL.2 MCCB 50 A, 3 pole 1 bh 550,000.00 550,000.00 55,000.00 605,000.00
MCB 6 A, 1 pole 3 bh 65,000.00 195,000.00 19,500.00 214,500.00
MCB 10 A, 1 pole 1 bh 65,000.00 65,000.00 6,500.00 71,500.00
Pilot Lamp 3 set 10,000.00 30,000.00 3,000.00 33,000.00
Fuse Pilot Lamp 3 set 10,000.00 30,000.00 3,000.00 33,000.00
Busbar 5 x ( 20 x 3 mm ) 1 set 820,000.00 820,000.00 82,000.00 902,000.00
Panel Kosong uk. 80 x 60 x 25 cm 1 set 750,000.00 750,000.00 75,000.00 825,000.00
Ongkos Pasang & stel 1 lot 253,500.00 253,500.00 25,350.00 278,850.00

3 PANEL LISTRIK RUMAH PENJAGA 2,962,850.00


DH.PL.3 MCCB 50 A, 3 pole 1 bh 550,000.00 550,000.00 55,000.00 605,000.00
MCB 6 A, 1 pole 3 bh 65,000.00 195,000.00 19,500.00 214,500.00
MCB 10 A, 1 pole 1 bh 65,000.00 65,000.00 6,500.00 71,500.00
Pilot Lamp 3 set 10,000.00 30,000.00 3,000.00 33,000.00
Fuse Pilot Lamp 3 set 10,000.00 30,000.00 3,000.00 33,000.00
Busbar 5 x ( 20 x 3 mm ) 1 set 820,000.00 820,000.00 82,000.00 902,000.00
Panel Kosong uk. 80 x 60 x 25 cm 1 set 750,000.00 750,000.00 75,000.00 825,000.00
Ongkos Pasang & stel 1 lot 253,500.00 253,500.00 25,350.00 278,850.00
Aalisa Pekerjaan Lain-Lain

No. Uraian Pekerjaan Kode Satuan Volume Harga Satuan Jumlah


A Pek. Instalasi Penangkal Petir
DH.PLL.1 Penangkal Petir Viking V3 Radius 110 Meter Unit 1.00 Rp 9,560,000.00 Rp 9,560,000.00
Kabel NYA 50 mm m' 20.00 Rp 82,300.00 Rp 1,646,000.00
Kabel BC 50 mm m' 36.00 Rp 52,500.00 Rp 1,890,000.00
Klem Penyangga kabel NYA 50 mm type konduktor bh 50.00 Rp 30,000.00 Rp 1,500,000.00
Klem Cincin bh 6.00 Rp 65,000.00 Rp 390,000.00
Skun bh 2.00 Rp 20,000.00 Rp 40,000.00
Pipa PVC 1" A.5.1.1.27 m' 20.00 Rp 20,889.28 Rp 417,785.50
Pipa PVC 1,5" A.5.1.1.28 m' 36.00 Rp 31,653.60 Rp 1,139,529.60
Tower Monopole 2 Meter bh 1.00 Rp 890,000.00 Rp 890,000.00
Stik Rod Bonded 1,5 Meter btg 3.00 Rp 396,500.00 Rp 1,189,500.00
Box Control + Isolator + Busbar Unit 1.00 Rp 1,050,000.00 Rp 1,050,000.00
Pek. Pengeboran Ø 1,5" Titik 3.00 Rp 2,000,000.00 Rp 6,000,000.00
Kabel Slink m' 18.00 Rp 28,700.00 Rp 516,600.00
Pek. Pas Beton Tumbuk (Pengikat Kabel Slink) dihit. m3 0.03 Rp 981,702.26 Rp 31,414.47
Pek. Bak Kontrol
Pek. Galian Tanah 1 m A.2.3.1.1 m3 0.08 Rp 101,004.75 Rp 8,181.38
Pek. Pas Dinding Batu Bata Bak Kontrol dihit. m2 1.08 Rp 161,601.00 Rp 174,529.08
Pek. Pas Plesteran ad 1 : 2 A. 4.4.2.2 m2 1.08 Rp 88,131.63 Rp 95,182.16
Pek. Pas Beton Tumbuk Lantai Penutup Bak Kontrol dihit. m3 0.03 Rp 981,702.26 Rp 26,505.96
Jumlah Total Rp 26,565,228.15
B Septick Tank
DH.PLL.2 Pek. Galian Tanah Sedalam 2 m A.2.3.1.2 m3 1.80 Rp 124,982.55 Rp 224,968.59
Pek. Beton Tumbuk dihit. m3 0.20 Rp 981,702.26 Rp 192,413.64
Pek. Dinidng 1/2 Bata, 1SP:2PS dihit. m2 5.40 Rp 161,601.00 Rp 872,645.40
Pek. Plesteran, 1SP:2PS A. 4.4.2.2 m2 5.40 Rp 81,385.26 Rp 439,480.40
Pek. Plat Beton Bertulang dihit. m3 0.25 Rp 6,260,493.14 Rp 1,533,820.82
Pek. Pas. Pipa PVC 1" A.5.1.1.27 m1 0.50 Rp 20,889.28 Rp 10,444.64
Pek. Pas. Pipa PVC 4" A.5.1.1.32 m1 7.00 Rp 65,683.26 Rp 459,782.79
Jumlah Total Rp 3,733,556.28
C Sumur Resapan
DH.PLL.3 Pek. Galian Tanah Sedalam 2 m A.2.3.1.2 m3 4.02 Rp 124,982.55 Rp 502,329.86
Pek. Beton Tumbuk dihit. m3 0.10 Rp 981,702.26 Rp 98,641.44
Pek. Buis Beton Dia. 80 cm dihit. bh 4.00 Rp 700,000.00 Rp 2,800,000.00
Pek. Plat Beton Bertulang dihit. m3 0.10 Rp 6,260,493.14 Rp 629,054.35
Pek. Pas ijuk & Kerikil dihit. ls 1.00 Rp 200,000.00 Rp 200,000.00
Jumlah Total Rp 4,230,025.66
HARGA SATUAN BAHAN DAN UPAH (HSBU)

0 : JASA KONSULTAN PERENCANAAN PEMBANGUNAN GEDUNG SISTEM RESI GUDANG (SRG)


Lokasi : : DESA NAMANG, KEC. NAMANG, KAB. BANGKA TENGAH

1 2 3 4
NO URAIAN SATUAN HARGA SATUAN

I. TENAGA KERJA

1 Pekerja Oh Rp 114,800.00
2 Tukang Oh Rp 160,300.00
3 Operator crane Oh
4 Pembantu operator crane Oh
5 Operator Oh
6 Kepala Tukang Oh Rp 183,400.00
7 Mandor Oh Rp 228,900.00
8 Operator alat berat Oh

II. BAHAN MATERIAL

1 Air Liter Rp 50.00


2 Ampelas Lembar Rp 8,000.00
3 Asesoris bak cuci piring Set Rp 35,000.00
Atap Seng bjls Galvalum 90 x 180 cm Lembar Rp 36,000.00
4 Atap Zincalum t= 0,35 mm m2 Rp 53,000.00
5 Bak Mandi Traso Vol. 0,3 m3 Buah Rp 235,000.00
6 Bak cuci piring (sink) stainless steel 1 lobang Buah Rp 250,000.00
7 Baja Ringan Taso 75.75 Btng Rp 85,600.00
###
8 Baja IWF Kg Rp 17,000.00
9 Besi Ulir Ø 13 M' Rp 12,916.67
10 Besi Ulir Ø 13 Kg Rp 12,402.93
11 Besi Ulir Ø 16 M' Rp 16,250.00
12 Besi Ulir Ø 16 Kg Rp 10,300.87
13 Besi Ulir Ø 19 M' Rp 22,916.67
14 Besi Ulir Ø 19 Kg Rp 10,301.61
15 Besi Ulir Ø 22 M' Rp 31,250.00
16 Besi Ulir Ø 22 Kg Rp 10,477.69
17 Besi Polos Ø 10 M' Rp 6,166.67
18 Besi Polos Ø 10 Kg Rp 10,007.17
19 Besi Polos Ø 12 M' Rp 8,916.67
20 Besi Polos Ø 12 Kg Rp 10,048.49
21 Batu Alam m2 Rp 192,600.00
22 Batu bata merah besar (7 x 9 x 20) (Lokal) Bh Rp 1,600.00
23 Batu belah 15-20 (cm) M³ Rp 415,000.00
24 Batu pecah 2 - 3 M³ Rp 415,000.00
25 Batu pecah 2 - 3 (kg) Kg Rp 307.00
Batu Kali Bulat M³ Rp 323,675.00
26 Baut (Screw Driver) Buah Rp 200.00
27 Besi beton Kg Rp 11,131.00
28 Besi Baut Kuda-Kuda Kg Rp 15,000.00
29 Besi Hollow Plafond M' Rp 6,500.00
31 Besi Hollow 20x20 mm t: 1,2mm M' Rp 9,166.00
Besi Hollow 20x40 mm t: 1,8mm M' Rp 8,226.00
30 Besi Hollow 40x40 mm t: 1,8mm M' Rp 9,363.00

31 Besi Hollow Galvalum 20x40 mm t: 0,25 mm Btg Rp 18,000.00


32 Besi Hollow Galvalum 40x40 mm t: 0,25 mm Btg Rp 23,000.00
33 Besi jaring kawat baja Kg Rp 21,000.00
34 Besi plat aluminium t=1mm m2 Rp 144,985.00
35 Besi plat baja Kg Rp 11,417.00
36 Besi strip 2 x 3 cm kg Rp 13,000.00
37 Beton K - 300 M3 Rp 1,003,500.00
38 Box kontrol + isolator + busbar unit Rp 1,050,000.00
39 Busbar 5 x (20 x 3 mm) Set Rp 820,000.00
40 Buis beton bertulang Ø 80 cm buah Rp 700,000.00
41 Bubungan Atap Metal bh Rp 35,000.00
Bubungan Alumunium Standar 40 cm bh Rp 25,000.00
42 Bubungan Atap Zincalum M' Rp 32,100.00
43 Cat Kayu Kg Rp 57,000.00
44 Cat menie Kg Rp 45,000.00
45 Cat minyak Kg Rp 57,000.00
46 Cat tembok (ex platon) Kg Rp 20,000.00
47 Cat tembok ext (ex mowilex) Kg Rp 70,000.00
48 Cat tembok in (ex mowilex) Kg Rp 100,000.00
49 Closed duduk standar (Ex. America Standart) Buah Rp 1,622,477.00
50 Closet Duduk / Monoblock + Jet Washer Buah Rp 2,100,000.00
Closet Jongkok Porcelaint (Lokal) Buah Rp 421,250.00
51 Conblock tebal 6 cm (polos) M² Rp 42,500.00
52 Conblock tebal 6 cm (warna) M² Rp 45,000.00
53 Dempul kayu Kg Rp 35,000.00
54 Dina bolt/ ramset Unit Rp 2,500.00
55 Elektroda penghantar bumi untuk penangkal petir Buah Rp 170,000.00
56 Engsel pintu kaca (pivot) stainless steel Buah Rp 898,800.00
57 Engsel pintu/ jendela 3" (ex.Dexon) Buah Rp 17,500.00
58 Engsel pintu/ jendela 4" (ex.Dexon) Buah Rp 23,500.00
59 Engsel pintu/ jendela 5" (Ex.Dexon) Buah Rp 30,000.00
60 Floor drain stainlessteel Buah Rp 35,000.00
61 Fuse pilot lamp buah Rp 10,000.00
62 Gypsum board motif uk. 1,22 x 2,44 (m), tebal 9 mm Lembar Rp 101,350.00
63 Gypsum board polos uk. 1,22 x 2,44 (m), tebal 9 mm Lembar Rp 75,484.00
64 Groundrod 5/8 2 meter btng Rp 750,000.00
65 Handle + kunci untuk pintu kusen alumunium Alumunium Set Rp 588,500.00
66 Handle jendela Buah Rp 10,000.00
67 Handle pintu Buah Rp 150,000.00
68 Hanger Kabel Tray ukr. 10 bh Rp 15,000.00
69 Hanger Kabel Tray ukr. 20 bh Rp 25,000.00
70 HPL (ex. Taco) Lembar Rp 218,000.00
71 Jendela alumunium lengkap (80x120) cm Buah Rp 802,500.00
72 Jet Shower (ext. Toto) Buah Rp 275,000.00
73 Jet Washer Buah Rp 90,000.00
74 Kabel Data cat 5. M' Rp 4,850.00
75 Kabel listrik NYM 3 x 2,5 mm2 M' Rp 14,747.60
76 Kabel listrik NYY 3 x 2,5 mm2 M' Rp 15,000.00
77 Kabel listrik NYY 3 x 4 mm2 M' Rp 21,900.00
78 Kabel listrik NYY 4 x 2,5 mm2 M' Rp 51,666.00
79 Kabel listrik NYY 4 x 4 mm2 M' Rp 34,235.50
80 Kabel NYM 3x2,5 mm M' Rp 14,133.00
81 Kabel NYM 4x2,5 mm M' Rp 19,089.00
82 Kabel NYYHY 3x1,5 mm M' Rp 10,000.00
83 Kabel NYA 50 mm M' Rp 82,300.00
84 Kabel BC 50 mm M' Rp 52,500.00
85 Kabel slink M' Rp 28,700.00
86 Kabel Signal C5 M' Rp 8,000.00
87 Kabel telepon 2 x 2 x 0,6 mm2 M' Rp 2,500.00
88 Kaca bening tebal 10 mm M² Rp 215,000.00
89 Kaca bening tebal 3 mm M² Rp 150,000.00
90 Kaca bening tebal 5 mm M² Rp 180,000.00
91 Kaca bening tebal 8 mm M² Rp 200,000.00
92 Kaca Cermin tebal 3mm M² Rp 90,950.00
93 Kaca Cermin tebal 5mm M² Rp 133,750.00
94 Kaca Cermin tebal 8mm M² Rp 149,800.00
95 kaca rayban Ukuran 5 mm m² Rp 200,000.00
96 Kaca rayban Ukuran 10 mm m² Rp 240,000.00
97 Kaca Tempred 10 mm + Upah m² Rp 3,437,500.00
98 Kaca Tempered 10 mm m² Rp 665,000.00
99 Kaca Tempered 12 mm m² Rp 700,000.00
100 Kaca Tempered 12 mm non standard m² Rp 950,000.00
101 Kait angin biasa Buah Rp 10,000.00
102 Kait angin istimewa Buah Rp 35,000.00
Kanstin Buah Rp 23,000.00
103 Karet Kaca M' Rp 10,000.00
104 Kawat beton Kg Rp 25,000.00
Kawat Las Kg Rp 27,000.00
Kawat Harmonika M2 Rp 30,000.00
105 Kayu dolken Ø8-10 (cm) panjang 4 m Batang Rp 10,000.00
106 Kayu gergajian kelas I, balok M³ Rp 3,750,000.00
107 Kayu gergajian kelas I, papan M³ Rp 3,750,000.00
108 Kayu gergajian kelas II, balok M³ Rp 2,500,000.00
109 Kayu gergajian kelas II, papan M³ Rp 2,500,000.00
110 Kayu gergajian kelas III, balok M³ Rp 2,000,000.00
111 Kayu gergajian kelas III, papan M³ Rp 1,800,000.00
112 Kayu gergajian kelas IV, balok M³ Rp 1,500,000.00
113 Kayu gergajian kelas IV, papan M³ Rp 1,500,000.00
Glassblock Bh Rp 27,500.00
114 Granit 30x60 (cm) steposing bh Rp 50,000.00
Genset 13,5 KVA, TYG 13 Unit Rp 105,820,000.00
115 Keramik 30x30 (cm) corak M² Rp 60,000.00
###
116 Keramik 40x40 (cm) corak M² Rp 55,000.00
###
117 Keramik 40x40 (cm) polos M² Rp 55,000.00
118 Keramik 50x50 (cm) polos M² Rp 96,300.00
119 Keramik 60x60 (cm) anti slip M² Rp 171,200.00
120 Keramik 60x60 (cm) putih/ berwarna ex. Granito M² Rp 175,000.00
#REF! Keramik 80x80 (cm) polos granit M² Rp 362,239.00
#REF! Keramik KM/WC antislip 20x20 (cm) M² Rp 65,000.00
#REF! Klem Cincin bh Rp 65,000.00
#REF! Klem Penyangga BC 50 mm2 type konduktor bh Rp 30,000.00
#REF! Klem Penyambung/pencabang BC 50 mm2 bh Rp 65,000.00
#REF! Kompon sak Rp 78,913.00
#REF! Kompon gypsum Kg Rp 10,000.00
#REF! Kran air Buah Rp 25,000.00
#REF! Kran Gate Valve Ø 1/2" PVC Buah Rp 15,000.00
#REF! Kran Gate Valve Ø 3/4" PVC Buah Rp 17,000.00
#REF! Kran Gate Valve Ø 1" PVC Buah Rp 25,000.00
#REF! Kran Gate Valve Ø 2" PVC Buah Rp 95,000.00
#REF! Kran leher angsa (ex. toto) Buah Rp 575,000.00
#REF! Kuas Buah Rp 30,000.00
#REF! Kunci jendela (Lokal) Set Rp 10,000.00
#REF! Kunci pintu tanam (Biasa) Set Rp 120,000.00
#REF! Kunci Selot Buah Rp 12,500.00
#REF! Kunci tanam Buah Rp 127,500.00
#REF! Kusen Alumunium 3 inch Coklat m' Rp 88,275.00
#REF! Kusen Alumunium 3 inch hitam m' Rp 90,000.00
#REF! Kusen Alumunium 3 inch silver m' Rp 95,000.00
#REF! Kusen Alumunium 4 inch Coklat m' Rp 100,045.00
#REF! Kusen Alumunium 4 inch hitam m' Rp 100,000.00
#REF! Kusen Alumunium 4 inch silver m' Rp 105,000.00
#REF! Kusen, pintu fiber Unit Rp 252,163.00
#REF! Lampu Downlight 18 Watt (Lengkap) Pcs Rp 73,000.00
#REF! Lampu TL RMI 2x18 Watt (Lengkap) set Rp 300,000.00
#REF! Lampu TL LED 2x18 Watt (Lengkap) set Rp 300,000.00
Lampu Jalan LED COB 22 Watt set Rp 551,250.00
#REF! Lem (standar aica aibond) Kaleng Rp 12,000.00
#REF! Lem (standar Fox)/ perekat Kaleng Rp 10,000.00
#REF! Lem kayu Kg Rp 20,000.00
#REF! List gypsum Kecil m' Rp 15,000.00
#REF! List gypsum sedang M' Rp 25,000.00
#REF! Lisplank GRC Board/Calsiboard 3M M' Rp 23,333.00
#REF! MCCB 3 Pole, 50 Ampere (setara Schneider) buah Rp 550,000.00
#REF! MCCB 3 Pole, 100 Ampere (setara Schneider) buah Rp 550,000.00
#REF! MCB 1 Pole, 6 - 10 Ampere (setara Schneider) buah Rp 65,000.00
#REF! MCB 3 Pole, 6 - 20 Ampere (setara Schneider) buah Rp 335,000.00
#REF! Minyak bekisting Liter Rp 27,500.00
#REF! Minyak pelarut/ pengencer cat (solvent) Liter Rp 8,000.00
#REF! Minyak Pelumas Liter Rp 35,000.00
#REF! Multiplek tebal 12 mm 4x8 (inch) Lembar Rp 190,000.00
#REF! Multiplek tebal 15 mm 4x8 (inch) Lembar Rp 230,000.00
#REF! Multiplek tebal 18 mm 4x8 (inch) Lembar Rp 260,000.00
#REF! Multiplek tebal 6 mm 1,22 x 2,44 (m) Lembar Rp 90,000.00
#REF! Multiplek tebal 9 mm 4x8 (inch) Lembar Rp 135,000.00
#REF! Outlet Data RJ. 45 bh Rp 65,000.00
Pek. Lantai Epoxy M2 Rp 190,000.00
#REF! Penangkal Petir Viking V3 radius 110 Meter Unit Rp 9,560,000.00
#REF! Paku berbagai ukuran (1/2"-1") Kg Rp 20,000.00
#REF! Paku berbagai ukuran (2"-5") Kg Rp 18,000.00
#REF! Paku sekrup (kg) Kg Rp 100,000.00
Paku Sekrup bh Rp 350.00
#REF! Paku seng Kg Rp 40,000.00
#REF! Paku tembok Kg Rp 65,000.00
#REF! Panel Kosong 80 x 60 x 25 cm Buah Rp 750,000.00
#REF! Partisi Kubikel M² Rp 275,000.00
#REF! Partisi Urinoir (ext. Toto) unit Rp 3,500,000.00
#REF! Pasir beton M³ Rp 87,500.00
#REF! Pasir beton (Kg) Kg Rp 89.00
#REF! Pasir pasang M³ Rp 87,500.00
#REF! Pasir urug/ timbun M³ Rp 50,000.00
#REF! Paving Block M² Rp 95,000.00
#REF! Pilot Lamp buah Rp 10,000.00
#REF! Pipa High Impact Ø 1/2 (inch), panjang 4 m btng Rp 11,400.00
#REF! Pipa Besi Galvanis Ø 1,5 (inch) M' Rp 37,500.00
#REF! Pipa Besi Galvanis Ø 2 (inch) M' Rp 43,333.00
#REF! Pipa Besi Galvanis Ø 3 (inch) M' Rp 58,333.00
#REF! Pipa Besi Galvanis Ø 4 (inch) M' Rp 83,333.00
#REF! Pipa PVC Ø 1 (inch) AW, panjang 4 m M' Rp 9,500.00
#REF! Pipa PVC Ø 1,5(inch) AW, panjang 4 m M' Rp 15,000.00
#REF! Pipa PVC Ø 2 (inch) AW, panjang 4 m M' Rp 17,000.00
#REF! Pipa PVC Ø 2,5 (inch) AW, panjang 4 m M' Rp 25,000.00
#REF! Pipa PVC Ø 3 (inch) AW, panjang 4 m M' Rp 37,500.00
#REF! Pipa PVC Ø 4 (inch) AW, panjang 4 m M' Rp 65,500.00
#REF! Pipa PVC Ø 6 (inch) AW, panjang 4 m M' Rp 125,000.00
#REF! Pipa PVC Ø1/2 (inch) AW, panjang 4 m M' Rp 5,250.00
#REF! Pipa PVC Ø3/4 (inch) AW, panjang 4 m M' Rp 7,500.00
#REF! Plamir tembok Kg Rp 12,000.00
#REF! Plint Kramik 60 x 30 cm, Step nose bh Rp 53,500.00
#REF! Plywood uk. 0,30 x 0,60 (m), tebal 4 mm Lembar Rp 75,000.00
#REF! Plywood uk. 0,30 x 0,60 (m), tebal 6 mm Lembar Rp 95,000.00
#REF! Plywood uk. 0,30 x 1,20 (m), tebal 4 mm Lembar Rp 59,385.00
#REF! Plywood uk. 0,30 x 1,20 (m), tebal 6 mm Lembar Rp 87,740.00
#REF! Plywood uk. 1,22 x 2,44 (m), tebal 4 mm Lembar Rp 115,000.00
#REF! Plywood uk. 1,22 x 2,44 (m), tebal 9 mm Lembar Rp 150,000.00
#REF! Plint PVC t = 10 cm M' Rp 75,000.00
#REF! Plafond PVC (standart) Lembar Rp 190,000.00
#REF! Railing tangga stainless steel pipa dia. 2" dan 1" M' Rp 1,118,150.00
#REF! Railing tangga besi hollow M² Rp 600,000.00
#REF! Rambuncis jendela bh Rp 12,000.00
Rangka atap baja ringan (kuda-kuda, gording, assesories) galvanis +
#REF! genteng metal M²
Rp 230,050.00
#REF! Reng Taso 32.45 Btg Rp 41,730.00
#REF! Raound Cooper Ø Tembaga 5/8, 2 m Btg Rp 750,000.00
Rooflight Fiberglass 90 x 180 Lbr Rp 80,500.00
#REF! Roof Drain Steinless, dia. 4" (ex. Toto) bh Rp 342,357.00
Roster Beton bh Rp 15,000.00
#REF! Solar Liter Rp 12,500.00
#REF! Saklar double Buah Rp 25,000.00
#REF! Saklar Double (broco) Buah Rp 21,400.00
#REF! Saklar tunggal Buah Rp 20,000.00
#REF! Saklar tunggal (broco) Buah Rp 13,910.00
#REF! Seal tape bh Rp 5,000.00
#REF! Sealant Tube Rp 35,000.00
#REF! Semen Mortar Kg Rp 7,148.00
#REF! Semen Portland Kg Rp 1,340.00
#REF! Semen putih Kg Rp 6,850.00
#REF! Semen warna (sika graut) Kg Rp 15,000.00
#REF! Seng gelombang uk. 2,10 x 0,90 (m) Lembar Rp 45,000.00
#REF! Seng plat BJLS 27 uk. 0.3 x 1.83 (m) Lembar Rp 40,850.00
#REF! Seng plat BJLS 27 uk. 0.9 x 1.83 (m) Lembar Rp 40,850.00
#REF! Shower + Stop Kran set Rp 86,938.00
#REF! Shower bad Hot & Cool set Rp 599,200.00
#REF! Shower bidet buah Rp 235,400.00
#REF! Shower Mandi buah Rp 225,000.00
#REF! Shower panas dingin set (ex. Washer) bh Rp 4,500,000.00
#REF! Sika Top 107 kg Rp 14,626.20
Sirtu M3 Rp 259,250.00
#REF! Skrup fixer Buah Rp 300.00
#REF! Skun Pcs Rp 20,000.00
#REF! Slot jendela Buah Rp 10,000.00
#REF! Slot pintu Buah Rp 20,000.00
#REF! Slot ventilasi/ bouwvenlight Buah Rp 10,000.00
#REF! Soda Api kg Rp 28,000.00
#REF! Spandeck zincalum setara " Union Deck", T=0,4 mm (1 m x 0,65 m) m2 Rp 100,415.38
#REF! Stik rod bonded 1,5 Meter batang Rp 396,500.00 esi
#REF! Stop Kontak + Saklar (broco) Buah Rp 26,750.00
#REF! Stop Kontak AC (broco) Buah Rp 49,220.00
#REF! Stop kontak ganda/ tiga Buah Rp 26,750.00
#REF! Stop kontak lantai Buah Rp 353,100.00
#REF! Stop kontak saklar Buah Rp 12,840.00
#REF! Stop kontak tunggal Buah Rp 20,000.00
#REF! Stop kontak untuk AC Buah Rp 74,900.00
#REF! Stop kontak+ instalasi Titik Rp 143,900.00
Sumur Bor + Pompa Jet Pump Set Rp 100,000,000.00
#REF! Tangki air fiberglass (oranye) 1000 liter Buah Rp 1,850,000.00
#REF! Teakwood 0,30 x 0,60 (m), tebal 4 mm Lembar Rp 55,426.00
#REF! Teakwood 0,90 x 2,10 (m), tebal 4 mm Lembar Rp 88,275.00
#REF! Teakwood 1,20 x 2,40 (m), tebal 4 mm Unit Rp 105,930.00
#REF! Tower Monopole 2 meter Unit Rp 890,000.00
#REF! Tray Cable 100x100x2 mm (U) m1 Rp 113,333.33
#REF! Tray Cable 100x100x2 mm (C) m1 Rp 116,666.67
#REF! Tray Cable 200x100x2 mm (U) m1 Rp 150,000.00
#REF! Tray Cable 200x100x2 mm (C) m1 Rp 153,333.33
#REF! Triplek tebal 2,5 mm uk. 1,22 x 2,44 (m) Lembar Rp 65,000.00
#REF! Triplek tebal 4 mm uk. 1,22 x 2,44 (m) Lembar Rp 80,000.00
#REF! Triplek tebal 6 mm uk. 1,22 x 2,44 (m) Lembar Rp 110,210.00
#REF! Urinoir Unit Rp 2,000,000.00
#REF! Urinoir (ext. Toto) Set Rp 2,800,000.00
#REF! Wallpaper Dinding Roll Besar M² Rp 65,000.00
#REF! Wallpapaer bermotif M² Rp 45,000.00
#REF! Wallpaper polos M² Rp 35,000.00
#REF! Wastafel (ext. Toto) Set Rp 1,750,000.00
#REF! wastafel Set Rp 1,250,000.00
#REF! Wastafel Ex.American standart (Kecil) Unit Rp 318,325.00
#REF! Wastafel Ex.American standart (Sedang) Unit Rp 374,500.00
#REF! Water drain + Assesories Set Rp 21,400.00
#REF! Water meter dia 1" + pipa gip Unit Rp 535,000.00
#REF! Water Profing Aquatex Kg Rp 141,240.00
#REF! Water Profing Nodrop Kg Rp 46,278.00
#REF! Water Profing ultraprof Kg Rp 41,730.00
#REF! Besi Wiremesh M-8 (2.1 m x 5.4 m) Kg Rp 13,619.00

*) Lampiran XII Standar Satuan Harga Barang Di Lingkungan Pemerintah


Kota Pangkalpinang Tahun 2020
*) Harga Survey Satuan Umum Upah, Bahan & Peralatan
Kabupaten Bangka Tengah Tahun 2020
*) Harga Survey Toko

Pangkalpinang, 29 Maret 2020


Pemasangan Instalasi Penangkal Petir

No. Uraian Pekerjaan Kode Satuan Volume Harga Satuan Jumlah


A Pek. Instalasi Penangkal Petir
1 Penangkal Petir Viking V3 Radius 110 Meter Unit 1.00 Rp 10,516,000.00 Rp 10,516,000.00
2 Kabel NYA 50 mm m' 20.00 Rp 90,530.00 Rp 1,810,600.00
3 Kabel BC 50 mm m' 24.00 Rp 57,750.00 Rp 1,386,000.00
4 Klem Penyangga kabel NYA 50 mm type konduktor bh 50.00 Rp 33,000.00 Rp 1,650,000.00
5 Klem Cincin bh 4.00 Rp 71,500.00 Rp 286,000.00
6 Skun bh 2.00 Rp 22,000.00 Rp 44,000.00
7 Pipa PVC 1" A.5.1.1.27 m' 20.00 Rp 20,889.28 Rp 417,785.50
8 Pipa PVC 1,5" A.5.1.1.28 m' 24.00 Rp 31,653.60 Rp 759,686.40
9 Tower Monopole 2 Meter bh 1.00 Rp 979,000.00 Rp 979,000.00
10 Stik Rod Bonded 1,5 Meter btg 2.00 Rp 436,150.00 Rp 872,300.00
11 Box Control + Isolator + Busbar Unit 1.00 Rp 1,155,000.00 Rp 1,155,000.00
12 Pek. Pengeboran Ø 1,5" Titik 2.00 Rp 2,000,000.00 Rp 4,000,000.00
13 Kabel Slink m' 18.00 Rp 31,570.00 Rp 568,260.00
14 Pek. Pas Beton Tumbuk (Pengikat Kabel Slink) B.01.a1 m3 0.03 Rp 981,702.26 Rp 31,414.47
B Pek. Bak Kontrol
1 Pek. Galian Tanah 1 m A.2.3.1.1 m3 0.05 Rp 101,004.75 Rp 5,454.26
2 Pek. Pas Dinding Batu Bata Bak Kontrol DH.2.1 m2 0.72 Rp 172,101.05 Rp 123,912.76
3 Pek. Pas Plesteran ad 1 : 2 A. 4.4.2.2 m2 0.72 Rp 88,131.63 Rp 63,454.77
4 Pek. Pas Beton Tumbuk Lantai Penutup Bak Kontrol B.01.a1 m3 0.02 Rp 981,702.26 Rp 17,670.64
Jumlah Total Rp 24,686,538.80
Pembuatan Parkiran

NO. URAIAN PEKERJAAN KODE VOLUME SAT HARGA SATUAN JUMLAH


1 2 3 4 5 6 7

I PEKERJAAN TEMPAT PARKIR


1 Pek. Galian Pondasi A.2.3.1.1 13.01 M3 Rp 101,004.75 Rp 1,313,566.77
2 Pek. Urugan Pasir t = 10cm A.2.3.1.11 1.28 M3 Rp 106,401.90 Rp 136,194.43
3 Pek. Coran Pondasi Footplat K-225 A. 4.1.1.7 4.39 M3 Rp 1,263,985.14 Rp 5,554,424.70
4 Pek. Pembesian Pondasi Footplat A.4.1.1.17 429.55 KG Rp 14,329.67 Rp 6,155,355.81
5 Pek. Coran Sloof uk. 0,2 x 0,3 K-225 A. 4.1.1.7 0.72 M3 Rp 1,263,985.14 Rp 910,069.30
6 Pek. Pembesian Sloof A.4.1.1.17 90.74 KG Rp 14,329.67 Rp 1,300,331.21
7 Pek. Dinding Batu Alam Tempel #NAME? 8.40 M2 #NAME? #NAME?
8 Pek. Pas. Cor Beton Tumbuk Lantai Kerja t = 5 cm B.01.a1 0.64 M3 Rp 981,702.26 Rp 628,289.45
9 Pek. Pas. Cor Beton Plat Lantai t = 10 cm B.01.a1 5.40 M3 Rp 981,702.26 Rp 5,301,192.20
10 Pek. Pas. Besi Weremesh M8 dihit. 295.79 KG Rp 14,980.90 Rp 4,431,170.45
11 Pek. Acian Cor Lantai A. 4.4.2.27 66.00 M2 Rp 52,214.80 Rp 3,446,176.80
12 Pek. Besi Tiang Kolom Pipa besi galvanis Ø 4 (inch) #NAME? 6.00 M1 #NAME? #NAME?
13 Pek. Besi Reng Pipa besi galvanis Ø 3 (inch) #NAME? 64.50 M1 #NAME? #NAME?
14 Pek. Besi Tiang Pipa galvanis Ø 3 (inch) #NAME? 37.00 M1 #NAME? #NAME?
15 Pek. Penutup Atap Spandek Zincalum tebal 0,4 mm #NAME? 72.24 M2 #NAME? #NAME?
16 Pek. Pas. Batu Bata Merah #NAME? 4.20 M2 Rp 161,601.00 Rp 678,724.20
17 Pek. Pas. Plesteran Bata Merah A. 4.4.2.4 5.40 M2 Rp 81,385.26 Rp 439,480.40
18 Pek. Pengecatan Pipa besi galvanis A. 4.7.1.5 26.20 M2 Rp 75,754.58 Rp 1,984,758.33
Total #NAME?
ANALISA JUMLAH TENAGA KERJA

Proyek :
Pekerjaan :
Lokasi :

Jumlah
No. & Kode Hari
Volume Koofisien Sat Uraian Keterangan Tenaga
Analisa Kerja
Kerja
a b c d e f

3 PEMBUATAN KANTOR SEMENTARA/DIREKSI KEET/Lt. plesteran


A. 2.2.1.5
2.000 Oh Tukang kayu Kayu 20
1.000 Oh Tukang batu Batu 10
30 2.000 Oh Pekerja 3 20
0.300 Oh Kepala Tukang 3
0.050 Oh Mandor Lapangan 1
4 PEMBUATAN GUDANG SEMEN DAN ALAT2
A. 2.2.1.7
2.000 Oh Tukang Kayu Kayu 24
1.000 Oh Pekerja 12
60 5
0.200 Oh Kepala Tukang 2
0.050 Oh Mandor Lapangan 1
6 PEKERJAAN PEMBERSIHAN LAPANGAN DAN PEMERATAAN
A. 2.2.1.9
0.100 Oh Pekerja 58
2333 4
0.050 Oh Mandor Lapangan 29
8 BONGKARAN BETON BERTULANG
A. 2.2.1.13
13.3334 Oh Pekerja 472
496 14
0.6666 Oh Mandor Lapangan 24
9 BONGKARAN DINDING TEMBOK BATA MERAH
A. 2.2.1.14
6.667 Oh Pekerja 12
5.395 3
0.333 Oh Mandor Lapangan 1
11 MENGUPAS BIDANG CAT
dihit.
12.40 0.040 Oh Pekerja 1 1
(2) PEKERJAAN DINDING
3 PASANGAN DINDING BATA MERAH/TEBAL 1 BATA/ 1 PC : 4 PS
A.4.4.1.3
0.600 Oh Pekerja 68
0.200 Oh Tukang batu 23
563.68 5
0.020 Oh Kepala Tukang 2
0.030 Oh Mandor Lapangan 3
( 3 ) PEKERJAAN PLESTERAN
2 PLESTERAN TEMBOK 1 PC : 4 PS / TEBAL 15 MM
A. 4.4.2.4
0.300 Oh Pekerja 44
0.150 Oh Tukang batu 22
1026.78 7
0.015 Oh Kepala Tukang 2
0.010 Oh Mandor Lapangan 2
3 ACIAN
A. 4.4.2.27
0.200 Oh Pekerja 26
0.100 Oh Tukang 13
516.73 4
0.010 Oh Kepala Tukang 1
0.010 Oh Mandor Lapangan 1
( 4 ) PEKERJAAN KAYU PINTU
1 KUSEN PINTU DAN JENDELA
A. 4.6.1.2
6.000 Oh Pekerja 22
18.000 Oh Tukang Kayu 66
11 3
1.800 Oh Kepala Tukang 7
0.300 Oh Mandor Lapangan 1
2 PINTU KACA DAN JENDELA KACA
A. 4.6.1.6
0.800 Oh Pekerja 2
2.400 Oh Tukang kayu 5
2.00 1
0.240 Oh Kepala Tukang 1
0.040 Oh Mandor Lapangan 0
( 5) PEKERJAAN ALUMUNIUM & CANAI
1 PEKERJAAN PASANGAN PINTU KACA & JENDELA KACA ALUMUNIUM
A.4.2.1.13
0.085 Oh Pekerja 1
0.085 Oh Tukang Alumunium 1
14.00 1
0.009 Oh Kepala Tukang 0
0.005 Oh Mandor Lapangan 0
3 PEKERJAAN PASANGAN RANGKA ATAP CANAI PROFIL C 75.75
A.4.2.1.24.2
0.200 Oh Pekerja 15
0.450 Oh Tukang 35
230.10 3
0.010 Oh Kepala Tukang 1
0.050 Oh Mandor Lapangan 4
4 PEKERJAAN PASANGAN PENUTUP ATAP
dihit.
0.200 Oh Pekerja 23
0.100 Oh Tukang 12
230.10 2
0.010 Oh Kepala Tukang 1
0.001 Oh Mandor Lapangan 0
( 6 ) PEKERJAAN PLAFOND
1 PASANG LIST PLAFOND GYPSUM
dihit.
0.050 Oh Pekerja 23
0.050 Oh Tukang 23
900.80 2
0.005 Oh Kepala Tukang 2
0.003 Oh Mandor Lapangan 1
2 RANGKA BESI HOLLOW 1X40.40.2 MM, modul 60 x 60 cm, untuk plafond
A.4.2.1.21
0.350 Oh Pekerja 82
0.350 Oh Tukang besi 82
1171.27 5
0.035 Oh Kepala Tukang 8
1171.27 5

0.018 Oh Mandor 4
3 PASANG PLAFOND GYPSUM BOARD tebal 9 mm
A. 4.5.1.7
0.200 Oh Pekerja 59
0.300 Oh Tukang 88
1171.27 4
0.030 Oh Kepala Tukang 9
0.010 Oh Mandor 3
(7) PEKERJAAN DINDING PEMISAH
1 RANGKA BESI HOLLOW 1X40.40.2 MM, modul 60 x 120 cm, untuk partisi
A.4.2.1.20
0.250 Oh Pekerja 47
0.250 Oh Tukang besi 47
566.27 3
0.025 Oh Kepala tukang 5
0.013 Oh Mandor 3
(8) PEKERJAAN BETON (ADUKAN)
2 MEMBUAT BETON MUTU f'c = 14,5 MPa (K-175)
A. 4.1.1.5
1.650 Oh Pekerja 31
0.275 Oh Tukang 5
18.88 1
0.028 Oh Kepala Tukang 1
0.083 Oh Mandor Lapangan 2
3 PENULANGAN BETON 1 M3 KOMPONEN UNTUK PLAT PRACETAK
A. 4.1.2.11
0.064 Oh Pekerja 9
0.244 Oh Tukang Batu 33
133.14 0.128 Oh Tukang Vibrator 1 17
0.034 Oh Kepala Tukang 5
0.073 Oh Mandor Lapangan 10
4 PENUANGAN BETON 1 M3 KOMPONEN UNTUK BALOK PRACETAK
A. 4.1.2.12
0.069 Oh Pekerja 13
0.242 Oh Tukang Batu 45
184.11 0.138 Oh Tukang Vibrator 1 26
0.037 Oh Kepala Tukang 7
0.073 Oh Mandor Lapangan 14
5 PENUANGAN BETON 1 M3 KOMPONEN UNTUK KOLOM PRACETAK
A. 4.1.2.13
0.061 Oh Pekerja 4
0.213 Oh Tukang Batu 14
66.76 0.122 Oh Tukang Vibrator 1 8
0.033 Oh Kepala tukang 2
0.073 Oh Mandor Lapangan 5
( 9 ) PEKERJAAN PEMBETONAN
1 MEMBUAT KOLOM PRAKTIS BETON BERTULANG/ 11X11 CM
A.4.1.1.35
0.180 Oh Pekerja 19
0.020 Oh Tukang Batu 2
0.020 Oh Tukang Kayu 2
214.50 2
0.020 Oh Tukang Besi 2
0.006 Oh Kepala Tukang 1
0.009 Oh Mandor Lapangan 1
2 PEMBESIAN DENGAN BESI POLOS (1 kg)
A.4.1.1.17
0.0070 Oh Pekerja 13
0.0070 Oh Tukang Besi Besi 13
1848.68 1
0.0007 Oh Kepala Tukang 1
0.0003 Oh Mandor Lapangan 1
3 PEMBESIAN DENGAN BESI ULIR (1 kg)
A.4.1.1.17
0.0070 Oh Pekerja 20
0.0070 Oh Tukang Besi 20
2895.76 1
0.0007 Oh Kepala Tukang 2
0.0003 Oh Mandor Lapangan 1
4 PASANGAN BEKISTING UNTUK KOLOM
A.4.1.1.22
0.660 Oh Pekerja 66
0.330 Oh Tukang Besi 33
496.00 5
0.033 Oh Kepala Tukang 3
0.033 Oh Mandor Lapangan 3
6 PASANGAN BEKISTING UNTUK BALOK
A.4.1.1.23
0.660 Oh Pekerja 181
0.330 Oh Tukang Kayu Besi 90
1095.18 4
0.033 Oh Kepala Tukang 9
0.033 Oh Mandor Lapangan 9
8 PASANGAN BEKISTING UNTUK PLAT
A.4.1.1.24
0.660 Oh Pekerja 135
0.330 Oh Tukang Besi 68
1024.15 5
0.033 Oh Kepala Tukang 7
0.033 Oh Mandor Lapangan 7
10 PASANGAN BEKISTING UNTUK TANGGA
A.4.1.1.26
0.660 Oh Pekerja 19
0.330 Oh Tukang Besi 10
114.25 4
0.033 Oh Kepala Tukang 1
0.033 Oh Mandor Lapangan 1
( 10 ) PEKERJAAN SANITASI
2 MEMASANG 1 m' PIPA PVC TIPE AW DIAMETER 1/2"
A.5.1.1.25
0.036 Oh Pekerja 1

21 1
0.060 Oh Tukang Pipa 1
21 1
0.006 Oh Kepala Tukang 0
21 1

0.002 Oh Mandor Lapangan 0


3 MEMASANG 1 m' PIPA PVC TIPE AW DIAMETER 1"
A.5.1.1.27
0.036 Oh Pekerja 4
0.060 Oh Tukang Pipa 6
103 1
0.006 Oh Kepala Tukang 1
0.002 Oh Mandor Lapangan 0
4 MEMASANG 1 m' PIPA PVC TIPE AW DIAMETER 2"
A.5.1.1.29
0.054 Oh Pekerja 3
0.090 Oh Tukang Pipa 5
57 1
0.009 Oh Kepala Tukang 1
0.003 Oh Mandor Lapangan 0
6 MEMASANG 1 m' PIPA PVC TIPE AW DIAMETER 4"- 6"
A.5.1.1.32
0.081 Oh Pekerja 6
0.135 Oh Tukang Pipa 9
68 1
0.014 Oh Kepala Tukang 1
0.004 Oh Mandor Lapangan 0
( 11 ) PEKERJAAN PENUTUP DINDING
1 PEMASANGAN DINDING KERAMIK 20 X 20
A. 4.4.3.54
0.900 Oh Pekerja 19
0.450 Oh Tukang Batu 10
42.31 2
0.045 Oh Kepala Tukang 1
0.045 Oh Mandor Lapangan 1
3 PEMASANGAN PLINT KAYU 2 cm x 20 cm
A. 4.4.3.63
0.120 Oh Pekerja 17
0.120 Oh Tukang 17
286.60 2
0.012 Oh Kepala Tukang 2
0.006 Oh Mandor Lapangan 1
( 12 ) PEKERJAAN LANTAI
1 PEMASANGAN LANTAI KERAMIK 20 X 20
A. 4.4.3.36
0.700 Oh Pekerja 15
0.350 Oh Tukang Batu 8
42.31 2
0.035 Oh Kepala Tukang 1
0.035 Oh Mandor Lapangan 1
2 PEMASANGAN LANTAI KERAMIK 60 X 60
A. 4.4.3.13
0.240 Oh Pekerja 91
0.120 Oh Tukang Batu 45
1130.86 3
0.012 Oh Kepala Tukang 5
0.012 Oh Mandor Lapangan 5
( 13 ) PEKERJAAN PENGECATAN
Pengecatan Bidang Kayu/Besi Baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis
1
cat penutup)
A. 4.7.1.5
0.070 Oh Pekerja 5
0.105 Oh Tukang Cat 8
73.87 1
0.004 Oh Kepala Tukang 0
0.003 Oh Mandor Lapangan 0
Pengecatan Tembok Baru Interior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat
2
penutup)
A. 4.7.1.10
0.0200 Oh Pekerja 17
0.0630 Oh Tukang Cat 54
856.54 1
0.0063 Oh Kepala Tukang 5
0.0025 Oh Mandor Lapangan 2
Pengecatan Tembok Baru Eksterior (1 lapis plamir, 1 lapis cat dasar, 2 lapis
3
cat penutup)
A. 4.7.1.10
0.0200 Oh Pekerja 3

155.50 1
0.0630 Oh Tukang Cat 10
155.50 1
0.0063 Oh Kepala Tukang 1
0.0025 Oh Mandor Lapangan 0

Anda mungkin juga menyukai