NO.
TOTAL HARGA
URUT D E S K R I P S I
( Rp )
I PEKERJAAN PERSIAPAN -
II PEKERJAAN LANTAI I
A PEKERJAAAN TANAH 113,839,671.67
IV PEKERJAAN LANTAI II
A PEKERJAAN BETON, PASANGAN & LANTAI Err:509
F PEKERJAAN SANITAIR -
F PEKERJAAN SANITAIR -
IMB Err:509
Disetujui Oleh,
PEJABAT PEMBUAT KOMITMEN
PROYEK DINAS KESEHATAN KOTA SIBOLGA T. A. 2009
SANGGA SIHITE
Nip. 1961.01.27-1984.06-1.001
RENCANA ANGGARAN BIAYA (R A B)
841,376.88
D PEKERJAAN ALAT-ALAT PENGGANTUNG
1 Kunci Tanam Union Besar Set #REF! #REF!
2 Engsel Pintu 4 " Bh 12.00 -
3 Engsel Jendela 3" Bh 12.00 -
4 Grendel Pintu 10" Bh 4.00 -
5 Grendel Jendela Bh 12.00 -
6 Hak Angin Jendela Bh 4.00 -
7 Handle Jendela Bh 4.00 -
#REF!
E PEKERJAAN INSTALASI LISTRIK
1 panel lampu unit 1.00 172,182.21 172,182.21
1 Pemipaan dan pengabelan ke Titik Api Titik 15.00 197,560.00 2,963,400.00
2 Lampu TL 40 Watt / complet Set Err:509 78,381.05 Err:509
3 Ac 1 pk Set 2.00 5,106,409.00 10,212,818.00
4 Lampu Pijar Set - -
5 Saklar Bh 1.00 30,779.70 30,779.70
6 Stop Kontak Bh 4.00 197,560.00 790,240.00
Err:509
F PEKERJAAN SANITAIR
1 Pipa air bersih PVC dia. 3/4 " M' 5.00 51,706.50 258,532.50
2 bak air fiber glass unit 1.00 2,170,091.55 2,170,091.55
3 M' -
4 Bh -
5 Bh -
6 Bh -
2,428,624.05
G PEKERJAAN PENGECATAN
1 Cat Kilat kayu M2 Err:509 64,749.35 Err:509
2 Cat Tembok / Plafond M2 113.49 48,144.24 5,463,889.51
Err:509
IV PEKERJAAN LANTAI III
A PEKERJAAN BETON, PASANGAN & LANTAI
1 Balok 20 x 40 cm M3 13.51 4,678,007.41 63,199,880.11
2 Kolom 30 x 30 cm M3 1.51 3,686,409.01 5,573,850.42
3 plat atap M3 Err:509 4,678,007.41 Err:509
4 dinding kerawang motif M2 49.24 80,937.50 3,985,362.50
Err:509
HARGA JUMLAH JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA SEMUA
(Rp.) (Rp.) (Rp.)
B PEK. KOZEN, PINTU & JENDELA
1 M3 -
-
C PEKERJAAN ATAP DAN PLAFOND
1 Rangka furing motif+ flapon gypsum M3 81.00 46,743.16 3,786,195.96
2 M' -
3 pemasangan kubah dia 8m unit 1.00 1.00 1.00
4 pemasangan kubah dia 2m unit 3.00 1.00 3.00
5 Talangan air M' 59.42 -
6 unit - -
3,786,199.96
D PEKERJAAN ALAT-ALAT PENGGANTUNG
-
E PEKERJAAN INSTALASI LISTRIK
1 Pemipaan dan pengabelan ke Titik Api Titik 15.00 -
2 Lampu TL 40 Watt / complet Set Err:509 Err:509
3 Lampu Balon 60 Watt Set 2.00 -
4 Lampu Pijar Set - -
5 Saklar Bh 1.00 -
6 Stop Kontak Bh 4.00 -
Err:509
F PEKERJAAN SANITAIR
1 M' -
2 M' -
-
G PEKERJAAN PENGECATAN
1 Cat Kilat kayu M2 -
2 Cat Tembok / Plafond M2 109.53 49,228.85 5,392,106.27
5,392,106.27
V PEKERJAAN LANTAI IV
A PEKERJAAN BETON, PASANGAN & LANTAI
Balok 20 x 40 cm 5.03 4,688,760.91 23,577,769.15
Kolom 30 x 30 cm 3.89 3,695,195.45 14,374,310.29
Pasangan Batu Bata 1 : 4 245,327.75 -
Plesteran Batu Bata 1 : 4 66,884.19 -
37,952,079.44
B PEK. KOZEN, PINTU & JENDELA
-
D PEKERJAAN ALAT-ALAT PENGGANTUNG
F PEKERJAAN SANITAIR
G PEKERJAAN PENGECATAN
1 pengecatan plafon 3 lapis m2 109.53 49,590.39 5,431,705.99
5,431,705.99
VII PEKERJAAN LAIN-LAIN
1 Foto Dokumentasi / Administrasi Bh 120.00 -
2 Laporan Harian Bln 4.00 -
2 Steling Kerja - Ls 750,000.00
3 Pembersihan Akhir - -
750,000.00
JUMLAH Err:509
PPN 10 % Err:509
IMB Err:509
TOTAL Err:509
DIBULATKAN Err:509
SANGGA SIHITE
. 1961.01.27-1984.06-1.001 Nip. 1961.01.27-1984.06-1.001
Lampiran Rencana Anggaran Biaya :
PEMBANGUNAN MASJID
A.4.4.1.7 Pemasangan 1 m2 dinding bata merah (5xx11x22) cm tebal 1/2 batu campuran 1SP: 2PP
Tenaga Kerja Pekerja L.01 OH 0.3000 96,000.00 28,800.00
Tukang Batu L.02 OH 0.1000 112,500.00 11,250.00
Kepala Tukang L.03 OH 0.0100 150,000.00 1,500.00
Mandor L.04 OH 0.0150 131,250.00 1,968.75
Jumlah harga tenaga kerja ... 43,518.75
Bahan Batu Merah m3 70.0000 1.59 111.24
Semen Portland KG 18.9500 1,340.67 25,405.70
Pasir Pasang m3 0.0380 173,586.75 6,596.30
Jumlah harga bahan ... 32,100.00
Peralatan
Jumlah harga peralatan ...
Harga Satuan Pekerjaan per - m3 … 75,618.75
A.4.4.1.2 Pemasangan 1 m2 dinding bata merah (5xx11x22) cm tebal 1 batu campuran 1SP: 2 PP
Tenaga Kerja Pekerja L.01 OH 0.6000 96,000.00 57,600.00
Tukang Batu L.02 OH 0.2000 112,500.00 22,500.00
Kepala Tukang L.03 OH 0.2000 150,000.00 30,000.00
Mandor L.04 OH 0.3000 131,250.00 39,375.00
Jumlah harga tenaga kerja ... 149,475.00
Bahan Batu Merah m3 140.0000 1.59 222.48
Semen Portland Zak 42.5000 1,787.56 75,971.30
Pasir Pasang m3 0.0800 77,400.00 6,192.00
Peralatan Jumlah harga bahan ... 82,400.00
Pembuatan dan Pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas 1
A.4.6.1.1 Tenaga Kerja
Pekerja L.01 OH 7.0000 96,000.00 672,000.00
Tukang Kayu L.02 OH 21.0000 112,500.00 2,362,500.00
Kepala Tukang L.03 OH 2.1000 150,000.00 315,000.00
Mandor L.04 OH 0.3500 131,250.00 45,937.50
Bahan Jumlah harga tenaga kerja ... 3,395,437.50
Balok Kayu m 3
1.1000 27,286.36 30,015.00
Paku 10 cm Kg 1.2500 18,009.00 22,511.25
Lem Kayu Kg 1.0000 45,010.90 45,010.90
Peralatan Jumlah harga bahan ... 97,500.00
A.BAHAN
TANGKAHAN
QUARRY JARAK
NO. JENIS MATERIAL HARGA (Rp)
SATUAN (LOKASI) (KM)
BAHAN BESI
1 Baut / Murr 1.00 Bh Sekitar - 4,669.00
2 Besi Beton 1.00 Kg Sekitar - 18,676.00
3 Besi Plat 1.00 Kg Sekitar - 26,680.00
4 Besi Profil 1.00 Kg Sekitar - 26,680.00
5 Besi Profil Galvanis 1.00 Kg Sekitar - 44,022.00
6 Besi Sheet File 1.00 Kg Sekitar - 26,680.00
7 Besi Ulir 1.00 Kg Sekitar - 20,010.00
8 Rangka Baja Ringan 1.00 M Sekitar - 490,245.00
PAKU
1 Paku Atap 1.00 Bh Sekitar - 1,334.00
2 Paku Beton 1.00 Bh Sekitar - 1,334.00
3 Paku Seng Gelombang 1.00 Kg Sekitar - 50,025.00
4 Paku Uk. 2" s./d 4 " 1.00 Kg Sekitar - 24,012.00
BAHAN PERPIPAAN
1 Pipa PVC 3/4" UNILON A.W 1.00 Btg Sekitar - 44,820.00
2 Pipa PVC 1" UNILON A.W 1.00 Btg Sekitar - 64,830.00
3 Pipa PVC 1,5" UNILON A.W 1.00 Btg Sekitar - 76,038.00
4 Pipa PVC 2" UNILON A.W 1.00 Btg Sekitar - 87,246.00
5 Pipa PVC 3" UNILON A.W 1.00 Btg Sekitar - 163,284.00
6 Pipa PVC 4" UNILON A.W 1.00 Btg Sekitar - 225,714.00
7 Pipa PVC 8" UNILON A.W 1.00 Btg Sekitar - 640,320.00
BAHAN KAPUR
1 Kapur Basah 1.00 M3 Sekitar - 126,063.00
2 Kapur Batu (Kerang) 1.00 M3 Sekitar - 196,098.00
BAHAN SEMEN
1 Semen Portland Pc @ 40 Kg 1.00 ZAK Sekitar 10.00 66,700.00
2 Semen Portland Pc @ 50 Kg 1.00 ZAK Sekitar 10.00 89,378.00
3 Semen Putih @ 40 Kg 1.00 ZAK Sekitar 10.00 160,080.00
4 Kapur Pasang 1.00 Krg Sekitar - 58,696.00
BAHAN CAT
1 Cat Cica 1.00 Kg Sekitar - 138,736.00
2 Cat Dasar 1.00 Kg Sekitar - 133,400.00
3 Cat Decolt 1.00 Kg Sekitar - 74,704.00
4 Cat Ici 1.00 Kg Sekitar - 77,372.00
5 Cat Kayu Besi 1.00 Kg Sekitar - 84,042.00
6 Cat Kuda Terbang Mini 1.00 Kg Sekitar - 53,360.00
7 Cat Menie 1.00 Kg Sekitar - 86,710.00
8 Cat Minyak 1.00 Kg Sekitar - 84,042.00
9 Cat Papan Tulis 1.00 Kg Sekitar - 63,365.00
10 Cat Vinilex 1.00 Kg Sekitar - 49,358.00
11 Dempul 1.00 Kg Sekitar - 20,010.00
12 Kolter 1.00 Kg Sekitar - 105,386.00
13 Kunci Wing 1.00 Bh Sekitar - 63,365.00
14 Minyak Cat - Terpentine 1.00 Ltr Sekitar - 46,023.00
15 Pelitur 1.00 Btl Sekitar - 46,023.00
16 Sidlak 1.00 Kg Sekitar - 61,364.00
17 Sirlak - Tiner 1.00 Kg Sekitar - 67,367.00
BAHAN KAYU
1 Kayu Kelas I 1.00 Ton Sekitar - 20,010,000.00
2 Kayu Kelas II 1.00 Ton Sekitar - 13,340,000.00
3 Kayu Kelas III (Sembarang) 1.00 Ton Sekitar - 6,670,000.00
4 Batang Kelapa 1.00 M Sekitar - 56,028.00
5 Formica 1.00 Lbr Sekitar - 105,386.00
6 Jabar Wood 1.00 Lbr Sekitar - 206,103.00
7 Kayu Bakar 1.00 M3 Sekitar - 252,793.00
8 Polywood Sunkay 1.00 Lbr Sekitar - 130,732.00
9 Polywood Tebal 3 MM 1.00 Lbr Sekitar - 163,415.00
10 Polywood Tebal 4 MM 1.00 Lbr Sekitar - 194,764.00
11 Polywood Tebal 6 MM 1.00 Lbr Sekitar - 240,787.00
12 Polywood Tebal 9 MM 1.00 Lbr Sekitar - 266,800.00
13 Polywood Tebal 12 MM 1.00 Lbr Sekitar - 287,477.00
14 Polywood Jati 1.00 Lbr Sekitar - 311,489.00
15 Taek Wood 1.00 Lbr Sekitar - 326,830.00
16 Tepas Bambu Uk. 2 x 2 M Sisik/Kulit 1.00 Lbr Sekitar - 64,032.00
17 Tepas Bambu 2 X 2 Misi/Hati 1.00 Lbr Sekitar - 70,035.00
PAPAN
1 Papan Kelas I (Damar Laut) 1.00 Kpg Sekitar 10.00 283,475.00
2 Papan Kelas II (Maranti) 1.00 Kpg Sekitar 10.00 186,760.00
3 Papan Kelas III Kayu Acuan (Sembarang) 1.00 Kpg Sekitar 10.00 120,060.00
BAHAN DOLKEN
1 Kayu Galam, Panjang 4 M 1.00 Btg Sekitar 10.00 52,693.00
2 Kayu Laut Diameter 3"-4" 1.00 Btg Sekitar 10.00 141,404.00
3 Kayu Papan Begisting Uk. 1" x 9 " Panjang 4.8 M 1.00 Kpg Sekitar 10.00 245,456.00
4 Kayu Penyanga Lainnya Uk. 2.5" x 2.5" Panjang 4.8 M 1.00 Btg Sekitar 10.00 83,375.00
5 Kayu Penyanga Lainnya Uk. 3" x 3" Panjang 4.8 M 1.00 Btg Sekitar 10.00 85,376.00
6 Kayu Tengar DiaMeter 3" - 4' 1.00 Btg Sekitar 10.00 107,387.00
7 Kayu Uk. 2" x 3" 1.00 Btg Sekitar 10.00 87,377.00
8 Kayu Untuk Cerucuk Diameter 2" (1 x 2) 1.00 Btg Sekitar 10.00 36,018.00
9 Kayu Untuk Cerucuk Diameter 3" (1 x 3) 1.00 Btg Sekitar 10.00 50,025.00
10 Kayu Untuk Cerucuk Diameter 4" (2 x 2) 1.00 Btg Sekitar 10.00 56,695.00
11 Kayu Untuk Cerucuk Diameter 6" (2 x 3) 1.00 Btg Sekitar 10.00 72,036.00
12 Kayu Usuk Klas I Uk. 1" x 2" 1.00 Btg Sekitar 10.00 86,043.00
13 Kayu Usuk Klas II Uk. 1" x 2" 1.00 Btg Sekitar 10.00 71,369.00
BAHAN BAHAN DARI SEMEN
1 Bodem 1.00 BH Sekitar - 49,358.00
2 Kanstin Ukuran 15 X 30 x 60 1.00 Bh. Sekitar - 80,040.00
3 Kanstin Ukuran 15 X 35 x 40 1.00 Bh. Sekitar - 54,694.00
4 Kanstin Ukuran 15 X 30 x 40 1.00 Bh. Sekitar - 48,024.00
5 Kanstin type L Ukuran 10 x 30 x 40 1.00 Bh. Sekitar - 72,036.00
6 Riol Beton 1/2 Ø 15CM - 1M' 1.00 BH Sekitar - 63,365.00
7 Riol Beton Ø 10 CM - 1M' 1.00 BH Sekitar - 54,694.00
8 Riol Beton Ø 20 CM - 1M' 1.00 BH Sekitar - 78,706.00
9 Riol Beton Ø 30 CM - 1M' 1.00 BH Sekitar - 100,050.00
10 Riol Beton Ø 40 CM - 1M' 1.00 BH Sekitar - 157,412.00
11 Riol Beton Ø 50 CM - 1M' 1.00 BH Sekitar - 236,118.00
12 Riol Beton Ø 60 CM - 1M' 1.00 BH Sekitar - 315,491.00
13 Riol Beton Ø 70 CM - 1M' 1.00 BH Sekitar - 378,189.00
14 Riol Beton Ø 80 CM - 1M' 1.00 BH Sekitar - 434,217.00
15 Riol Beton Ø 100 CM - 1M' 1.00 BH Sekitar - 504,252.00
16 Flat Sheet Pile 220 - 500 1.00 M Sekitar - 602,301.00
17 Flat Sheet Pile 320 - 500 1.00 M Sekitar - 882,441.00
BAHAN ACCESSORIES/BAHAN LAINNYA
1 Film Berwarna 1.00 BH Sekitar - 2,700.00
2 Cetak Photo 1.00 LBR Sekitar - 2,700.00
3 Bateray 1.00 BH Sekitar - 2,000.00
4 Alat Bantu 1.00 SET Sekitar - 87,120.00
5 Goni Plastik Isi 50 Kg 1.00 BH Sekitar - 4,669.00
6 Plengki (Bambu) 1.00 BH Sekitar - 35,351.00
7 Plengki (Rotan) 1.00 BH Sekitar - 43,355.00
8 Sapu Lidi Gagang 1.00 IKAT Sekitar - 20,010.00
9 Ceret Aspal 1.00 BH Sekitar - 49,358.00
10 Gayung Aspal 1.00 BH Sekitar - 35,351.00
11 Bros Aspal 1.00 BH Sekitar - 24,012.00
12 Tempat Pemasak Aspal 1.00 BH Sekitar - 181,680.00
13 Sendi/Roll Jembatan 1.00 SET Sekitar - 5,952,975.00
14 Atap Nipah 1.00 LBR Sekitar - 25,346.00
15 Bambu 1.00 Btg Sekitar - 16,008.00
16 Goni 1.00 Bh Sekitar - 4,669.00
17 Ijuk 1.00 Kg Sekitar - 26,680.00
18 Tali Plastik 1.00 Glg Sekitar - 7,337.00
19 Tali Rotan 1.00 Ikat Sekitar - 14,007.00
20 Batu Alam Andesit (15 x 30 cm) 1.00 M2 BA 333,500.00
21 Plastik bond breaker 1.00 M2 7,500.00
22 Air bersih 1.00 Liter 750.00
B.UPAH
HARGA
NO. JENIS UPAH SATUAN TANPA PPn KET
(Rp.)
1 2 3 4
UPAH KERJA
1 DRAFTMAN O/H 123,750.00
2 JAGA MALAM O/H 72,000.00
3 JURU UKUR O/H 150,000.00
4 JURU UKUR PEMBANTU O/H 112,500.00
5 MANDOR O/H 131,250.00
6 OPERATOR O/H 123,750.00
7 OPERATOR PEMBANTU O/H 93,750.00
8 PEKERJA/ BURUH TERLATIH O/H 96,000.00
9 PEKERJA/ BURUH SEMI TERLATIH O/H 84,000.00
10 PEKERJA/ BURUH TIDAK TERLATIH O/H 66,750.00
11 PEMASAK ASPAL O/H 66,750.00
12 SUPIR / DRIVER O/H 112,500.00
13 SUPIR PEMBANTU O/H 66,750.00
14 TUKANG O/H 112,500.00
15 KEPALA TUKANG O/H 150,000.00
16 TUKANG CAT O/H 90,000.00
17 TUKANG CAT PEMBANTU O/H 75,000.00
18 MEKANIK O/H 118,500.00
Disusun Oleh :
Beton
= (( 0.30 x 0.30 ) + ( 1.20 x 1.20 )) / 2.00 x 0.10
Untuk 1 m3 Beton
Untuk 1 m3 Beton
= 1.00 / 0.51 x 3.36 = 6.61 M2
1 PANJANG BESI
Panjang Besi
Kolom = Pokok = 4.00 = 4.00 M
Bengkokan = 2.00 x 0.05 = 0.10 M
Stick = 40.00 x 0.02 = 0.64 M
Total Panjang = 4.74 M
= 4.75 M
BEKISTING
Panjang Besi
Kolom = Pokok = 3.50 = 3.50 M
Bengkokan = 2.00 x 0.05 = 0.10 M
Total Panjang = 3.60 M
Panjang Besi
Kolom = Pokok = 3.00 x 1.00 = 3.00 M
Bengkokan = 2.00 x 0.05 = 0.10 M
Total Panjang = 3.10 M
BERAT BESI
BEKISTING
BALOK SLOOF 30 X 30 CM
Bentang = 3.00 M
Dimensi = 0.30 x 0.30
Volume = 0.30 x 0.40 x 3.00 = 0.36 M3
Panjang Besi
Balok = Pokok = 3.00 x 1.00 = 3.00 M
Bengkokan = 2.00 x 0.05 = 0.10 M
Total Panjang = 3.10 M
BEKISTING
BALOK SLOF 20 X 40 CM
Bentang = 3.50 M
Dimensi = 0.20 x 0.40
Volume = 0.20 x 0.40 x 3.50 = 0.28 M3
Panjang Besi
Balok = Pokok = 3.50 x 1.00 = 3.50 M
Bengkokan = 2.00 x 0.05 = 0.10 M
Total Panjang = 3.60 M
BEKISTING
Besi
Berat Besi
Untuk 1 M3 Beton
Bekisting
= 4.00 x ( 0.20 + 0.40 + 0.40 ) = 4.00 M2
Balok 25 x 40 cm
Bentang = 3.50 M
Dimensi = 0.25 x 0.40
Volume = 0.25 x 0.40 x 3.50 = 0.35 M3
Panjang Besi
Balok = Pokok = 3.50 x 1.00 = 3.50 M
Bengkokan = 2.00 x 0.05 = 0.10 M
Total Panjang = 3.60 M
BALOK 20 X 30 CM
Bentang
Dimensi
Volume = 3.50 M
= 0.20 x 0.30
Panjang Besi = 0.20 x 0.30 x 3.50 = 0.21 M3
Bentang
Dimensi
Volume = 3.50 M
= 0.15 x 0.20
Panjang Besi = 0.15 x 0.20 x 3.50 = 0.11 M3
Tapak
Besi
Dia 14 = 12.00 x ( 0.90 + 0.15 + 0.05 ) x 2.00 x 1.209 = 31.92 Kg
Stick
Dia 14 = 6.00 x ( 0.30 + 2.00 + 0.60 + 0.10 ) x 1.209 = 21.76 Kg
Jml = 53.68 Kg
Beton
= (( 0.20 x 0.20 ) + ( 1.00 x 1.00 )) / 2.00 x 0.10
Untuk 1 M3 Beton
Untuk 1 M3 Beton
1 PANJANG BESI
Panjang Besi
Kolom = Pokok = 4.00 = 4.00 M
Bengkokan = 2.00 x 0.05 = 0.10 M
Stick = 40.00 x 0.02 = 0.64 M
Total Panjang = 4.74 M
= 4.75 M
BEKISTING
1 PANJANG BESI
Panjang Besi
Kolom = Pokok = 3.50 = 3.50 M
Bengkokan = 2.00 x 0.05 = 0.10 M
Total Panjang = 3.60 M
=
BEKISTING
Tapak
= 7.00 x ( 0.55 x 2.00 + 0.16 x 2.00 + 0.10 ) = 8.12 M'
= 4.00 x ( 1.15 x 2.00 + 0.16 x 2.00 + 0.10 ) = 9.62 M'
Dinding
Beton
= 0.60 x 0.20 x 1.20 = 0.14
= 1.20 x 0.20 x 1.00 = 0.24
= 0.38 M3
im3 Beton
Bekisting
= 0.20 x ( 0.60 x 2.00 + 1.20 x 2.00 ) = 0.88
= 1.00 x ( 0.20 x 2.00 + 1.20 x 2.00 ) = 3.60
4.48
im3 Beton
= 11.67 / 2 = 5.83
PEMBANGUNAN MASJID AT TAQWIM
I PEKERJAAN PERSIAPAN
1 papan nama proyek 1 1.00 Ls
2 Pengarikan bow-plank 1.00 1.00 Ls
3 Pembongkaran bangunan existing 1.00 1.00 Ls
II PEKERJAAN TANAH
1 Galian tanah pondasi - Pondasi setempat P1 2.10 2.10 4.41
1.50 1.50 2.25 3.33 5.49 18.30 3.00 54.89
- Pondasi setempat P2 1.90 1.90 3.61
1.30 1.30 1.69 2.65 4.37 11.59 18.00 552.71
- Pondasi setempat P6 1.9 2.35
1.3 1.75 2.28 1.14 1.88 2.13 2.00 4.86
- Pondasi setempat P4 1.80 1.50 2.70
1.2 0.9 1.08 1.89 3.12 5.89 5.00 29.47
- Pondasi setempat P5 1.5 1.5 2.25
0.9 0.9 0.81 1.53 2.52 3.86 1.00 3.86
- Pondasi setempat P2a 1.66 2.2 3.65
1.06 1.6 1.70 2.67 4.41 11.80 1.00 11.80
- Pondasi setempat P23 3.1 1.8 5.58
2.5 1.2 3.00 4.29 7.08 30.37 1.00 30.37
- Pondasi setempat P24a 1.9 2.39 4.54
1.3 1.79 2.33 3.43 5.67 19.46 1.00 19.46
- Pondasi setempat P24b 3.05 1.7 5.19
2.45 1.1 2.70 3.94 6.50 25.61 1.00 25.61
- Pondasi setempat P14 2.1 2.67 5.61
1.5 2.07 3.11 4.36 7.19 31.31 1.00 31.31
- Sloof 0.90 0.90 0.81
0.30 0.30 0.09 0.90 0.50 0.45 - -
- Sloof Entrance 0.30 0.30 0.5 0.15 0.75 2.00 0.23
- Pondasi Tangga 1.20 1.20 2.40 2.88 1.00 1.00 2.88 776.18 M³
0.60 0.60 1.20 1.80 2.70 4.86 1.00 8.75
776.18 1.00 776.18
2 Urugan kembali bekas galian 776.18 1.00 776.18
- Pasir urug 4.57 (1.00) (4.57)
- Lantai kerja beton cor 1 : 3 : 5 0.05 (3.00) (0.15)
- Pondasi setempat P1 3.88 (3.00) (11.64)
- Pondasi setempat P2 2.96 (18.00) (53.19)
- Pondasi setempat P6 4.00 (2.00) (8.01)
- Pondasi setempat P4 1.90 (5.00) (9.49)
- Pondasi setempat P5 1.45 (1.00) (1.45)
- Pondasi setempat P2a 2.81 (1.00) (2.81)
- Pondasi setempat P23 5.12 (1.00) (5.12)
- Pondasi setempat P24a 4.12 (1.00) (4.12)
- Pondasi setempat P24b 4.74 (1.00) (4.74)
- Pondasi setempat P14 5.42 (1.00) (5.42) 657.72 M³
pondasi p6 3.88 (2.00) (7.76)
3 Pasir urug - Pondasi setempat P1 1.5 1.5 0.05 0.11 1 3.00 0.34
- Pondasi setempat P2 1.3 1.3 0.05 0.08 18.00 1.52
- Pondasi setempat P6 1.3 1.75 0.05 0.11 2.00 0.23
- Pondasi setempat P4 1.2 0.9 0.05 0.05 5.00 0.27
- Pondasi setempat P5 0.9 0.9 0.05 0.04 1.00 0.04
- Pondasi setempat P2a 1.06 1.6 0.05 0.08 1.00 0.08
- Pondasi setempat P23 25 1.2 0.05 1.50 1.00 1.50
- Pondasi setempat P24a 1.3 1.79 0.05 0.12 1.00 0.12
- Pondasi setempat P24b 2.45 1.1 0.05 0.13 1.00 0.13
- Pondasi setempat P13 1.5 2.07 0.05 0.16 1.00 0.16
- Pondasi Tangga 0.60 0.60 0.05 0.02 1.00 0.02
- sloof 0.30 0.30 0.05 0.005 34.00 0.15
- Sloof Entrance 0.30 0.30 0.05 0.02 0.75 1.00 0.01
- Bangunan 12.00 8.42 0.05 0.42 1.00 0.42 4.57 M³
9.00 6.00 0.05 2.70 1.00 2.70
3.00 3.00 0.05 0.45 1.00 0.45
- Entrance 1.50 3.00 0.05 0.23 1.00 0.23 3.80 M³
8.37 M³
4 Timbunan peninggi peil sisa timbunan 776.18 657.72 8.37 110.09 1.00 110.0926036 M³
timbunan feil I 12.00 9.00 108.00
II 6.00 6.00 36.00
III 17.76 15.00 133.20 277.20 0.50 1.00 138.60 138.60 M³
28.51 M³
2 Pondasi setempat P1
- Pondasi 1.50 1.50 1.65 3.71 1.00 3.00 11.14
- Kolom 0.30 0.30 1.85 0.17 1.00 3.00 0.50 11.64 M³
3 Pondasi setempat P2
- Pondasi 1.30 1.30 1.65 2.79 1.00 16.00 44.62
- Kolom 0.30 0.30 1.85 0.17 1.00 16.00 2.66 47.28 M³
5 Pondasi setempat p5
- Pondasi 0.90 0.90 1.65 1.34 1.00 3.00 4.01
- Kolom 0.25 0.25 1.85 0.12 1.00 3.00 0.35 4.36 M³
10 Pondasi setempat P14 - Pondasi 1.50 2.07 1.65 5.12 1.00 1.00 5.12
- Kolom 0.30 0.30 1.85 0.17 1.00 1.00 0.17 5.42 M³
- Kolom 0.25 0.25 2.05 0.13 1.00 1.00 0.13
- Besi beton Pj bh ttl.pjg berat ttl.berat
Besi pondasi Ø 14 - 10 0.014 1.94 11.00 21.34 1.21 25.79
Besi pondasi Ø 14 - 10 0.014 1.71 7.00 11.97 1.21 14.46
Besi pondasi Ø 14 - 10 0.014 1.14 12.00 13.68 1.21 16.53
Besi pondasi Ø12 - 20 0.012 1.51 12.00 18.12 0.89 16.09
Besi pondasi Ø12 - 20 0.012 1.21 2.00 2.42 0.89 2.15
Besi pondasi Ø12 - 20 0.012 1.21 4.00 4.84 0.89 4.30
Besi kolom 4Ø 14 0.014 2.15 8.00 17.20 1.21 20.78
Besi kolom 6Ø 14 0.014 2.15 12.00 25.80 1.21 31.18
Besi begel Ø8-20 0.008 1.30 20.00 25.92 0.39 10.23 141.50 1.00 141.50 141.50 Kg
26.12 Kg/M3
- Bekisting 0.30 0.30 1.85 2.22 1.00 2.22
- Bekisting 0.25 0.25 1.85 1.85 1.00 1.85 4.07 M²
11 Pondasi setempat P6
- Pondasi 1.50 1.50 1.65 3.71 1.00 2.00 7.43
- Kolom 0.30 0.30 1.85 0.17 1.00 2.00 0.33
- Kolom Ø 0,40 0.13 1 2.00 0.25 8.01 M³
- Besi beton Pj bh ttl.pjg berat ttl.berat
Besi pondasi Ø 14 - 10 0.014 1.74 17.00 29.58 1.21 35.74
Besi pondasi Ø12 - 20 0.012 1.31 8.00 10.48 0.89 9.30
Besi pondasi Ø 14 - 10 0.014 2.19 13.00 28.47 1.21 34.40
Besi pondasi Ø12 - 20 0.012 1.77 6.00 10.62 0.89 9.43
Besi kolom4Ø 14 0.014 2.15 16.00 34.40 1.21 41.57
Besi begel Ø8-20 0.008 1.30 20.00 25.92 0.39 10.23 140.67 2.00 281.34 281.34 Kg
35.13 Kg/M3
- Bekisting 0.30 0.30 1.50 1.80 2.00 3.60 M²
- Bekisting diameter 0,4 1.5 0.19 2.00 0.38 3.98
12 Pondasi tangga
- Pondasi 1.20 1.20 1.65 2.38 1.00 16.00 38.02
- Kolom 0.20 0.20 1.85 0.07 1.00 16.00 1.18 39.20 M³
13 Balok sloof 30 x 30 - Beton cor 1 : 3 : 5 0.30 0.30 0.09 123.49 11.11 11.11 M³
- Besi beton Pj bh ttl.pjg berat ttl.berat
Besi balok 6 Ø 14 0.014 1.00 12.00 12.00 1.21 14.50
Besi begel Ø 8- 20 0.008 1.06 5 5.28 0.39 2.08 16.58 123.49 2,047.88 2,047.88 Kg
184.33 Kg/M3
- Bekisting 0.30 0.30 1.20 123.49 148.19 148.19 M2
14 kolom 25 x 25 - Beton cor 1 : 3 : 5 0.25 0.25 4.00 0.25 10.00 2.50 2.50 M³
- Besi beton Pj bh ttl.pjg berat ttl.berat
Besi balok 5 Ø 14 0.014 4.25 10.00 42.50 1.21 51.35
Besi begel Ø 8- 20 0.008 0.82 21.25 17.43 0.39 6.88 58.23 10.00 582.30 582.30 Kg
232.92 Kg/M3
- Bekisting 0.25 0.25 1.00 4.00 10.00 40.00 40.00 M2
5Ø14
15 Kolom 30 x 30 - Beton cor 1 : 1,5 : 2,5 0.30 0.30 4.00 0.32 26.00 8.42 8.42 M³
- Besi beton Pj bh ttl.pjg berat ttl.berat
Besi balok3 Ø 14 0.014 4.25 6.00 25.50 1.21 30.81
Besi begel Ø 8- 20 0.008 1.02 21.25 21.68 0.39 8.55 39.36 26.00 1,023.48 1,023.48 Kg
121.55 Kg/M3
17 Kolom praktis 15 x 15 bulat - Beton cor k 250 0.15 0.15 4.00 0.09 8.00 0.72 0.72 M³
- Besi beton Pj bh ttl.pjg berat ttl.berat
Besi 3 Ø 14 0.014 4.25 6.00 25.50 1.21 30.81
Besi begel Ø 8- 20 0.008 0.42 21.25 8.93 0.39 3.52 34.33 8.00 274.67 274.67 Kg
381.49 Kg/M3
18 plat kanopi - Beton cor k 250 1.20 0.85 0.10 0.10 3.00 0.31 0.31 M³
- Besi beton Pj bh ttl.pjg berat ttl.berat
Besi Ø 12 - 15 0.014 1.66 8.00 13.28 1.21 16.05
Besi Ø 12- 20 0.008 1.31 4.00 5.24 0.39 2.07 18.11 3.00 54.34 54.34 Kg
175.30 Kg/M3
2 Lampu hias gantung ruang sholat 1.00 1.00 1.00 1.00 Unit
3 Lampu down Light 18 watt inden ruang sholat 14.00 1.00 14.00
mihrab 1.00 1.00 1.00
teras 1.00 1.00 1.00 16.00 Unit
C LANTAI II
I PEKERJAAN BETON DAN PASANGAN
1 lantai cor samping ruang sholat 4.5 8.75 0.1 3.94
5.11 8.18 0.1 4.18
ruang penjaga mesjid 6 6 0.1 3.60 11.72 1 11.72 11.72 M2
- Besi beton Pj bh ttl.pjg berat ttl.berat
Besi lantai Ø 10 - 20 0.010 6.17 30.00 185.10 0.62 114.11
5.08 40.00 203.20 0.62 125.27
4.47 43.00 192.21 0.62 118.50 357.88 2.00 715.77 715.77 Kg
61.09 Kg/M3
Bekisting 11.72 M2
2 Balok 25 x 50 - Beton cor 1 : 3 : 5 0.25 0.50 0.13 112.35 1.00 14.04 14.04 M³
- Besi beton Pj bh ttl.pjg berat ttl.berat
Besi balok 4 Ø 14 0.014 1.00 8.00 8.00 1.21 9.67
Besi begel Ø 8- 20 0.008 1.32 5 6.60 0.39 2.60 12.27 112.35 1,378.63 1,378.63 Kg
98.19 Kg/M3
- Bekisting 0.25 0.50 1.50 112.35 168.53 168.53 M2
3 Kolom 15 x 15 - Beton cor 1 : 1,5 : 2,5 0.15 0.15 4.00 0.08 1.00 0.08 0.08 M³
- Besi beton Pj bh ttl.pjg berat ttl.berat
Besi balok 5 Ø 14 0.014 4.25 10.00 42.50 1.21 51.35
Besi begel Ø 8- 20 0.008 0.42 21 8.93 0.39 3.52 54.88 1.00 54.88 54.88 Kg
685.95 Kg/M3
4 Kolom 25 x 25 - Beton cor 1 : 1,5 : 2,5 0.25 0.25 4.00 0.23 6.00 1.35 1.35 M³
- Besi beton Pj bh ttl.pjg berat ttl.berat
Besi balok 5 Ø 14 0.014 4.25 10.00 42.50 1.21 51.35
Besi begel Ø 8- 20 0.008 0.82 21 17.43 0.39 6.88 58.23 6.00 349.38 349.38 Kg
258.80 Kg/M3
5 Kolom 30 x 30 - Beton cor 1 : 1,5 : 2,5 0.30 0.30 4.00 0.32 28.00 9.07 9.07 M³
- Besi beton Pj bh ttl.pjg berat ttl.berat
Besi kolom 5Ø 14 0.014 4.20 10.00 42.04 1.21 50.80
Besi begel Ø 8- 20 0.008 1.02 21 21.44 0.39 8.46 59.26 28.00 1,659.23 1,659.23 Kg
182.94 Kg/M3
8 Plat kanopi - Beton cor k 250 1.20 0.85 0.10 0.10 3.00 0.31 0.31 M³
- Besi beton Pj bh ttl.pjg berat ttl.berat
Besi Ø 12 - 15 0.014 1.66 8.00 13.28 1.21 16.05
Besi Ø 12- 20 0.008 1.31 4.00 5.24 0.39 2.07 18.11 3.00 54.34 54.34 Kg
175.30 Kg/M3
11 Plesteran camp. 1 : 2 , t = 15 mm - Pas 1/2 bata camp 1:4 3.96 2.00 7.92 7.92 M3
13 Plesteran camp. 1 : 4 , t = 15 mm - Pas 1/2 bata camp 1:4 113.49 2.00 226.98 226.98 M3
2 Pintu sorong p1 Luas Kosen 1.20 2.45 2.94 1.00 2.94 2.94 M2
Luas Jendela 0.45 2.40 1.08 1.00 1.08 2.16 M2
Kosen 0.05 0.10 0.01 7.10 1.00 0.04 0.04 M3
1.00 Unit
0.6 0.6
3 Handrail stainless steel Ø50 ruang sholat 8.42 1.20 10.10 10.10 M2
50.52 50.52 unit
tangga 4.00 1.20 4.80 4.80 M2
24.00 24.00 unit
79.32 unit
III PEKERJAAN ATAP DAN FLAPOND
1 Rangka furing motif ruang penjaga masjid 3.00 3.00 9.00 2.00 18.00 18.00 M²
D LANTAI III
I PEKERJAAN BETON DAN PASANGAN
1 Balok 25 x 50 - Beton cor 1 : 3 : 5 0.20 0.50 0.10 135.08 13.51 13.51 M³
- Besi beton Pj bh ttl.pjg berat ttl.berat
Besi balok 3 Ø 14 0.014 1.00 6.00 6.00 1.21 7.25
Besi begel Ø 8- 20 0.008 1.22 10 12.20 0.39 4.81 12.06 135.08 1,629.56 1,629.56 Kg
120.62 Kg/M3
- Bekisting 0.20 0.50 1.40 135.08 189.11 189.11 M2
2 Balok kubah 20 x 40 - Beton cor 1 : 3 : 5 0.20 0.40 3.14 0.25 2.00 0.50 0.50 M³
- Besi beton Pj bh ttl.pjg berat ttl.berat
Besi balok 3 Ø 14 0.014 4.92 6.00 29.51 1.21 35.66
Besi begel Ø 8- 20 0.008 1.02 49 50.17 0.39 19.79 55.45 3.00 166.35 166.35 Kg
330.82 Kg/M3
- Bekisting 0.20 0.40 1.20 3.00 3.60 3.60 M2
E LANTAI IV
I PEKERJAAN BETON DAN PASANGAN
1 Balok 25 x 40 - Beton cor 1 : 3 : 5 0.25 0.40 50.29 5.03 1.00 5.03 5.03 M³
- Besi beton Pj bh ttl.pjg berat ttl.berat
Besi balok 3 Ø 14 0.014 19.06 6.00 114.37 1.21 138.19
Besi begel Ø 8- 20 0.008 1.42 191 270.67 0.39 106.79 244.99 244.99 Kg
48.72 Kg/M3
- Bekisting 0.25 0.40 1.30 50.29 65.37 65.37 M2
2 Balok 20 x 40 kubah - Beton cor 1 : 3 : 5 0.20 0.40 3.14 0.25 2.00 0.50 0.50 M³
- Besi beton Pj bh ttl.pjg berat ttl.berat
Besi balok 3 Ø 14 0.014 4.92 6.00 29.51 1.21 35.66
Besi begel Ø 8- 20 0.008 1.02 49 50.17 0.39 19.79 55.45 2.00 110.90 110.90 Kg
220.55 Kg/M3
- Bekisting 0.20 0.40 1.20 2.00 2.40 2.40 M2
3 Balok 20 x 40 - Beton cor 1 : 3 : 5 0.20 0.40 0.08 65.42 1.00 65.42 65.42 M³
- Besi beton Pj bh ttl.pjg berat ttl.berat
Besi balok 3 Ø 14 0.014 3.19 6.00 19.16 1.21 23.16
Besi begel Ø 8- 20 0.008 1.02 32 32.58 0.39 12.85 36.01 1.00 36.01 36.01 Kg
0.55 Kg/M3
- Bekisting 0.20 0.40 1.20 1.00 1.20 1.20 M2
total beton cor 65.92 M3
total Besi 146.91 kg
total Bekisting 3.60 M2
4 Kolom 30 x 30 - Beton cor 1 : 1,5 : 2,5 0.30 0.30 4.00 0.32 12.00 3.89 3.89 M³
- Besi beton Pj bh ttl.pjg berat ttl.berat
Besi balok3 Ø 14 0.014 4.20 6.00 25.22 1.21 30.48
Besi begel Ø 8- 20 0.008 1.02 42 42.88 0.39 16.92 47.40 4.00 189.59 189.59 Kg
48.74 Kg/M3
20.48 m2
7 Pasangan 1 bata campuran 1 ; 2 2.8 0.4 4 4.48 4.48 m2
8 Plasteran 1 ; 4 tebal 15 cm 4.48 2 8.96 8.96 m2
II PEKERJAAN PENGECATAN
1 Pengecatan Plafond 3 Lapis Plesteran 1:4
Plafond standard 8.96 M²
Kubah Ø 8.00 201.14 100.57 100.57
109.53 M²
F LANTAI V
1 Kolom 30 x 30 - Beton cor 1 : 1,5 : 2,5 0.30 0.30 3.00 0.23 12.00 2.81 2.81 M³
- Besi beton Pj bh ttl.pjg berat ttl.berat
Besi balok3 Ø 14 0.014 3.20 6.00 19.22 1.21 23.23
Besi begel Ø 8- 20 0.008 1.02 32 32.68 0.39 12.89 36.12 4.00 144.49 144.49 Kg
51.42 Kg/M3
Bekisting 0.30 0.30 1.20 4.00 4.80 4.80 m2
2 Balok 20 x 40 kubah - Beton cor 1 : 3 : 5 0.20 0.40 3.14 0.25 2.00 0.50 0.50 M³
- Besi beton Pj bh ttl.pjg berat ttl.berat
Besi balok 3 Ø 14 0.014 4.92 6.00 29.51 1.21 35.66
Besi begel Ø 8- 20 0.008 1.02 49 50.17 0.39 19.79 55.45 1.00 55.45 55.45 Kg
110.27 Kg/M3
- Bekisting 0.20 0.40 3.14 1.00 3.14 3.14 M2
G PEKERJAAN LANDSCAPE
1 Landscape 1 1 1.00 Ls
3 Saluran air limbah 1.00 0.50 24.00 12.00 1.00 12.00 12.00 M3
IX PEKERJAAN LAIN-LAIN
1 P3K
2 Foto dokumentasi
3 Pembersihan Akhir
ANALISA PEMBESIAN DAN BEKESTING
P x L x T
Volume ( 1 M³ ) = 11.111 0.3 0.3
Pembesian :
C C
30 Tulangan Lentur Ø= 14 mm
V V
v v Jumlah Tul = 12.00 Bh
Berat Kg/M = 1.21 Kg
C C C
V 30
V V Berat Total = 14.50 Kg
v v v Tulangan Geser Ø= 8 mm
Jumlah Tul = 5.00 Bh
Berat Kg/M = 0.39 Kg
Panjang Tul = 1.06 M¹
Berat Total = 2.08 Kg
Berat Total Pembesian = 16.58 Kg
Bekesting :
Luas 1 = M²
Luas 2 = 6.67 M²
Luas Total = 6.67 M²
P x L x T
Volume ( 1 M³ ) = 11.11 0.30 0.3
30 Pembesian :
Tulangan Lentur Ø= 14 mm
Jumlah Tul = 12.00 Bh
Berat Kg/M = 1.21 Kg
30 Berat Total = 162.56 Kg
Tulangan Geser Ø= 8 mm
Jumlah Tul = 111.11 Bh
Berat Kg/M = 0.39 Kg
Panjang Tul = 1.02 M¹
Berat Total = 44.72 Kg
Berat Total Pembesian = 207.28 Kg
Bekesting :
Luas 1 = 6.67 M²
Luas 2 = 3.33 M²
Luas Total = 10.00 M²
Bekesting :
Luas 1 = 8.00 M²
Luas 2 = 0.00 M²
Luas Total = 8.00 M²
P x L x T
Volume ( 1 M³ ) = 4.00 1.20 0.2
Pembesian :
20 Tulangan Lentur 1 Ø= 14 mm
120 Jumlah Tul = 6.00 Bh
Berat Kg/M = 1.21 Kg
Berat Total = 29.73 Kg
Tulangan Lentur 2 Ø= 8 mm
Jumlah Tul = 20.00 Bh
Berat Kg/M = 0.39 Kg
Berat Total = 10.26 Kg
Berat Total Pembesian = 79.97 Kg
Bekesting :
Luas 1 = 4.80 M²
Luas 2 = 1.60 M²
Luas Total = 6.40 M²
LANTAI II
ELEMEN STRUKTUR : BALOK 25 x 50
P x L x T
Volume ( 1 M³ ) = 8.00 0.25 0.5
C C Pembesian :
50 V V Tulangan Lentur Ø= 14 mm
C v C
v
Jumlah Tul = 8.00 Bh
V V
v v
C C
V V
v C C
C v Berat Kg/M = 1.21 Kg
25 V
V V Berat Total = 78.30 Kg
v v v Tulangan Geser Ø= 8 mm
Jumlah Tul = 80.00 Bh
Berat Kg/M = 0.39 Kg
Panjang Tul = 1.32 M¹
Berat Total = 41.67 Kg
Berat Total Pembesian = 119.97 Kg
Bekesting :
Luas 1 = 2.00 M²
Luas 2 = 8.00 M²
Luas Total = 10.00 M²
P x L x T
Volume ( 1 M³ ) = 16.00 0.25 0.25
Pembesian :
Tulangan Lentur Ø= 14 mm
25 Jumlah Tul = 8.00 Bh
Berat Kg/M = 1.21 Kg
25 Berat Total = 155.63 Kg
Tulangan Geser Ø= 8 mm
Jumlah Tul = 160.00 Bh
Berat Kg/M = 0.39 Kg
Panjang Tul = 0.90 M¹
Berat Total = 56.82 Kg
Berat Total Pembesian = 212.45 Kg
Bekesting :
Luas 1 = 8.00 M²
Luas 2 = 0.00 M²
Luas Total = 8.00 M²
P x L x T
Volume ( 1 M³ ) = 11.11 0.30 0.3
30 Pembesian :
Tulangan Lentur Ø= 14 mm
Jumlah Tul = 12.00 Bh
v Berat Kg/M = 1.21 Kg
30
v Berat Total = 162.56 Kg
v Tulangan Geser Ø= 8 mm
v Jumlah Tul = 111.11 Bh
v Berat Kg/M = 0.39 Kg
v Panjang Tul = 1.02 M¹
v Berat Total = 44.72 Kg
v
v
v
v
v
v
v
v
v
v Berat Total Pembesian = 207.28 Kg
v
v
Bekesting :
v
v Luas 1 = 6.67 M²
v Luas 2 = 3.33 M²
v Luas Total = 10.00 M²
v
v
v
v
ELEMEN STRUKTUR : PELAT LANTAI 900 x 10
v
v
P x L x T
v C
Volume ( 1 M³ ) = 1.11 9.00 0.1
v V
v v Pembesian :
10 C v C Tulangan Lentur 1 Ø= 14 mm
900
V v V Jumlah Tul = 45.00 Bh
v v v Berat Kg/M = 1.21 Kg
v Berat Total = 65.85 Kg
v Tulangan Lentur 2 Ø= 8 mm
v Jumlah Tul = 5.56 Bh
v Berat Kg/M = 0.39 Kg
v Berat Total = 19.95 Kg
v Berat Total Pembesian = 171.60 Kg
v
v Bekesting :
v
Luas 1 = 10.00 M²
v
Luas 2 = 0.22 M²
v
v Luas Total = 10.22 M²
v
v
v LANTAI III
v
ELEMEN STRUKTUR : BALOK 25 x 50
v
v P x L x T
v Volume ( 1 M³ ) = 8.00 0.25 0.5
Cv C Pembesian :
50 V V Tulangan Lentur Ø= 14 mm
C v Cv
Jumlah Tul = 8.00 Bh
V V
v C C
C v Berat Kg/M = 1.21 Kg
25 V
V V Berat Total = 78.30 Kg
v v v Tulangan Geser Ø= 8 mm
Jumlah Tul = 80.00 Bh
Berat Kg/M = 0.39 Kg
Panjang Tul = 1.32 M¹
Berat Total = 41.67 Kg
Berat Total Pembesian = 119.97 Kg
Bekesting :
Luas 1 = 2.00 M²
Luas 2 = 8.00 M²
Luas Total = 10.00 M²
ELEMEN STRUKTUR : KOLOM 30 x 30
P x L x T
Volume ( 1 M³ ) = 11.11 0.30 0.3
30 Pembesian :
Tulangan Lentur Ø= 14 mm
Jumlah Tul = 12.00 Bh
Berat Kg/M = 1.21 Kg
30 Berat Total = 162.56 Kg
Tulangan Geser Ø= 8 mm
Jumlah Tul = 111.11 Bh
Berat Kg/M = 0.39 Kg
Panjang Tul = 1.02 M¹
Berat Total = 44.72 Kg
Berat Total Pembesian = 207.28 Kg
Bekesting :
Luas 1 = 6.67 M²
Luas 2 = 3.33 M²
Luas Total = 10.00 M²
P x L x T
Volume ( 1 M³ ) = 12.50 0.20 0.4
Pembesian :
40 Tulangan Lentur Ø= 14 mm
Jumlah Tul = 6.00 Bh
Berat Kg/M = 1.21 Kg
20 Berat Total = 91.35 Kg
Tulangan Geser Ø= 8 mm
Jumlah Tul = 125.00 Bh
Berat Kg/M = 0.22 Kg
Panjang Tul = 1.02 M¹
Berat Total = 28.10 Kg
Berat Total Pembesian = 119.46 Kg
Bekesting :
Luas 1 = 2.50 M²
Luas 2 = 10.00 M²
Luas Total = 12.50 M²
P x L x T
Volume ( 1 M³ ) = 2.08 2.40 0.2
Pembesian :
20 Tulangan Lentur 1 Ø= 14 mm
240 Jumlah Tul = 24.00 Bh
Berat Kg/M = 1.21 Kg
Berat Total = 63.32 Kg
Tulangan Lentur 2 Ø= 8 mm
Jumlah Tul = 20.83 Bh
Berat Kg/M = 0.39 Kg
Berat Total = 20.55 Kg
Berat Total Pembesian = 167.73 Kg
Bekesting :
Luas 1 = 4.53 M²
Luas 2 = M²
Luas Total = 4.53 M²
LANTAI IV
ELEMEN STRUKTUR : BALOK 25 x 50
P x L x T
Volume ( 1 M³ ) = 8.00 0.25 0.5
C C Pembesian :
50 V V Tulangan Lentur Ø= 14 mm
C v Cv
Jumlah Tul = 8.00 Bh
V V
v C C
C v Berat Kg/M = 1.21 Kg
25 V
V V Berat Total = 78.30 Kg
v v v Tulangan Geser Ø= 8 mm
Jumlah Tul = 80.00 Bh
Berat Kg/M = 0.39 Kg
Panjang Tul = 1.32 M¹
Berat Total = 41.67 Kg
Berat Total Pembesian = 119.97 Kg
Bekesting :
Luas 1 = 2.00 M²
Luas 2 = 8.00 M²
Luas Total = 10.00 M²
P x L x T
Volume ( 1 M³ ) = 11.11 0.30 0.3
30 Pembesian :
Tulangan Lentur Ø= 14 mm
Jumlah Tul = 12.00 Bh
Berat Kg/M = 1.21 Kg
30 Berat Total = 162.56 Kg
Tulangan Geser Ø= 8 mm
Jumlah Tul = 111.11 Bh
Berat Kg/M = 0.39 Kg
Panjang Tul = 1.02 M¹
Berat Total = 44.72 Kg
Berat Total Pembesian = 207.28 Kg
Bekesting :
Luas 1 = 6.67 M²
Luas 2 = 3.33 M²
Luas Total = 10.00 M²
P x L x T
Volume ( 1 M³ ) = 12.50 0.20 0.4
Pembesian :
40 Tulangan Lentur Ø= 14 mm
Jumlah Tul = 6.00 Bh
Berat Kg/M = 1.21 Kg
20 Berat Total = 91.35 Kg
Tulangan Geser Ø= 8 mm
Jumlah Tul = 125.00 Bh
Berat Kg/M = 0.00 Kg
Panjang Tul = 1.02 M¹
Berat Total = 0.00 Kg
Berat Total Pembesian = 91.35 Kg
Bekesting :
Luas 1 = 2.50 M²
Luas 2 = 10.00 M²
Luas Total = 12.50 M²
P x L x T
Volume ( 1 M³ ) = 0.63 8.00 0.2
Pembesian :
20 Tulangan Lentur 1 Ø= 14 mm
800 Jumlah Tul = 80.00 Bh
Berat Kg/M = 1.21 Kg
Berat Total = 70.08 Kg
Tulangan Lentur 2 Ø= 8 mm
Jumlah Tul = 6.25 Bh
Berat Kg/M = 0.39 Kg
Berat Total = 19.97 Kg
Berat Total Pembesian = 180.12 Kg
Bekesting :
Luas 1 = 50.29 M²
Luas 2 = M²
Luas Total = 50.29 M²
CC
VV
v v
C CC
V VV
v v v
2230.845
RENCANA ANGGARAN BIAYA
PEMBANGUNAN MASJID AT TAQWIM
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME
ANALISA SATUAN SATUAN HARGA
(Rp.) (Rp.)
A PEKERJAAN PERSIAPAN
1 Pembersihan lapangan Ls 1.00 Ls 10,000,000.00 10,000,000.00
2 Pengukuran dan pemasangan bow-plank Ls 1.00 Ls 1,000,000.00 1,000,000.00
3 Pengadaan air kerja Ls 1.00 Ls 1,000,000.00 1,000,000.00
4 Penerangan kerja Ls 1.00 Ls 1,000,000.00 1,000,000.00
JUMLAH A 13,000,000.00
B LANTAI I
I PEKERJAAN TANAH
1 Galian tanah pondasi 776.18 M3 92,306.25 71,646,504.22
2 Urugan kembali bekas galian 657.72 M3 54,562.50 35,887,070.48
3 Pasir urug 8.37 M3 171,020.70 1,430,742.07
4 timbunan peninggian feil 28.51 M3 297,310.94 8,475,560.83
JUMLAH IB 117,439,877.61
II PEKERJAAN BETON DAN PASANGAN
1 Lantai kerja beton cor k250 3.43 M3 815,155.31 2,798,958.03
2 Pondasi setempat
- Beton cor k 250 103.10 M3 1,087,296.06 112,097,346.33
- Besi beton 3,449.54 Kg 16,804.59 57,968,105.39
2 - Mall/bekisting 76.89 M2 96,064.78 7,386,146.46
3 Pondasi tangga 120 x 120
- Beton cor k 250 39.20 M3 1,087,296.06 42,622,005.55
- Besi beton 68.79 Kg 16,804.59 1,155,987.75
- Mall/bekisting 1.48 M2 263,642.71 390,191.21
4 Balok sloof 30 x 30
- Beton cor k 250 11.11 M3 1,087,296.06 12,079,859.23
- Besi beton 2,047.88 Kg 16,804.59 34,413,762.45
4 - Mall/bekisting 148.19 M2 96,087.52 14,239,209.59
5 kolom 25 x 25
- Beton cor k 250 2.50 M3 1,087,296.06 2,718,240.15
- Besi beton 582.30 Kg 16,804.59 9,785,255.29
5 - Mall/bekisting 40.00 M2 239,340.52 9,573,620.80
6 Kolom utama 30 x 30
- Beton cor k 250 8.42 M3 1,087,296.06 9,155,032.83
- Besi beton 1,023.48 Kg 16,804.59 17,199,224.08
#REF! - Mall/bekisting 31.20 M2 239,340.52 7,467,424.22
7 Kolom bulat
- Beton cor k 250 0.25 M3 1,087,296.06 271,824.02
- Besi beton 126.52 Kg 16,804.59 2,126,126.74
- Mall/bekisting 3.20 M2 239,340.52 765,889.66
8 Kolom praktis 15 x 15
- Beton cor k 125 0.72 M3 971,623.27 699,568.75
- Besi beton 274.67 Kg 16,804.59 4,615,766.21
- Mall/bekisting 4.80 M2 239,340.52 1,148,834.50
9 Kanopi
- Beton cor k 250 0.31 M3 971,623.27 301,203.21
- Besi beton 54.34 Kg 16,804.59 913,207.61
- Mall/bekisting 12.30 M2 239,340.52 2,943,888.40
9 List profil 47.74 M' 50,000.00 2,387,000.00
7 Tangga
- Beton cor k 250 1.20 M3 971,623.27 1,165,947.92
- Besi beton 129.70 Kg 16,804.59 2,179,473.99
- Mall/bekisting 12.00 M2 373,408.96 4,480,907.52
8 Pasangan 1/2 bata camp. 1 65.42 M² 75,618.75 4,947,281.10
9 Pasangan 1/2 bata camp. 1 : 2 184.45 M² 231,875.00 42,769,807.50
10 Plesteran camp. 1 : 2 , t = 15 mm 148.21 M² 67,093.75 9,943,830.50
11 Plesteran camp. 1 : 4 , t = 15 mm 363.01 M² 62,393.75 22,649,679.98
12 Dinding babet 42.25 M² 500,000.00 21,125,000.00
13 Lantai granito 120 x 60 173.50 M² 164,193.96 28,487,652.06
14 Lantai keramik 30 x 30 3.93 M² 215,562.68 847,161.33
15 Lantai keramik 20 x 20 98.15 M² 212,879.25 20,894,396.42
16 lantai keramik 60 x 60 2.88 M' 385,147.42 1,109,224.57
JUMLAH IIB 517,824,041.35
III PEKERJAAN KUSEN PINTU JENDELA
1 Rangka furing motif Ls 18.00 M² 87,780.00 1,580,040.00
2 Plafon gyfsum 9 mm motif 18.00 M² 45,412.66 817,427.88
3 Pintu sorong tipe P1
- rel pintu geser 7.00 set 647,653.75 4,533,576.25
- pintu geser 7.00 Unit 1,875,000.00 13,125,000.00
4 Pintu sorong tipe P2
- rel pintu geser 1.00 set 647,653.75 647,653.75
- pintu geser 1.00 Unit 1,875,000.00 1,875,000.00
5 pintu panel tipe P3 2.00 Unit 900,931.25 1,801,862.50
6 pintu fiber tipe P4 4.00 Unit 383,958.50 1,535,833.99
7 jendela kaca panel tipe J1 5.00 Unit 385,281.83 1,926,409.15
8 jendela kaca panel tipe J2 25.00 Unit 385,281.83 9,632,045.75
JUMLAH IIIB 37,474,849.27
IV PEKERJAAN INSTALASI LISTRIK
1 penel utama Ls 1.00 Unit 174,743.18 Rp 174,743.18
2 panel penerangan 1.00 Unit 72,389.94 Rp 72,389.94
3 instalasi listrik 70.00 Unit 134,700.00 Rp 9,429,000.000
4 lampu downlight 18 watt inden 16.00 Unit 135,000.00 Rp 2,160,000.000
5 Lampu TL 40 Watt / complet 14.00 Unit 47,028.63 658,400.82
6 Lampu gantung 1.00 Unit 5,250,000.00 5,250,000.00
7 -Saklar tunggal 9.00 Unit 26,649.09 239,841.78
- saklar ganda 4.00 Unit 29,508.71 118,034.85
8 AC 1 PK 6.00 Unit 3,500,000.00 21,000,000.00
9 Stop Kontak 15.00 Unit 32,138.82 482,082.26
10 lampu halogen 3.00 Unit 500,000.00 1,500,000.00
11 Lampu taman + tiang 2.00 Unit 541,541.80 1,083,083.60
JUMLAH IVB 41,992,833.26
V PEKERJAAN INSTALASI AIR
1 Pipa air bersih PVC dia. 1 " 24.39 M 51,706.50 1,261,121.54
2 Pipa air kotor PVC dia. 4 " 16.65 M 94,074.13 1,566,334.22
3 Pipa air bekas PVC dia. 4 " 47.85 M 94,074.13 4,501,447.00
4 Closed Jongkok Keramik 4.00 Unit 384,713.84 1,538,855.36
5 Bak fiber glass 4.00 Unit 2,170,091.55 8,680,366.20
6 Floor Drain dia. 4" 8.00 Unit 126,866.25 1,014,930.00
7 pipa air 1/2 " 5.00 M 51,706.50 258,532.50
8 Kran Air dia.1/2" 10.00 Unit 90,576.69 905,766.90
9 Septictank 2.00 unit 11,220,000.00 22,440,000.00
10 pemasangan urinoir 4.00 unit 2,271,787.50 9,087,150.00
11 elbow 1 ' 10.00 Bh 17,284.75 172,847.50
elbow4'' 20.00 Bh 105,404.08 2,108,081.62
12 sambungan 1 '' 6.00 Bh 17,284.75 103,708.50
sambungan 4 '' 16.00 Bh 105,404.08 1,686,465.30
13 pompa setara sanyo 1.00 unit 1,150,000.00 1,150,000.00
JUMLAH VB 56,475,606.64
VI PEKERJAAN PENGECATAN
1 cat tembok 332.66 M2 46,336.55 15,414,316.72
2 cat plafond 18.00 M2 46,336.55 834,057.90
JUMLAH VIB 16,248,374.62
C LANTAI II
I PEKERJAAN BETON DAN PASANGAN
1 lantai beton cor k 250 11.72 M3 1,097,517.62 12,860,140.79
besi beton 715.77 kg 168,854.40 120,860,716.33
bekisting 11.72 M2 284,348.58 3,331,848.83
2 balok 25 x 50
- Beton cor k 250 14.04 M3 1,097,517.62 15,409,147.42
- Besi beton 1,378.63 Kg 16,885.44 23,278,709.60
3 - Mall/bekisting 168.53 M2 244,856.12 41,265,602.32
3 Kolom 15 x 15
- Beton cor k 125 0.08 M3 981,844.83 78,547.59
- Besi beton 54.88 Kg 16,885.44 926,603.68
- Mall/bekisting 2.40 M2 244,828.83 587,589.20
4 Kolom 25 x 25
- Beton cor k 250 1.35 M3 1,097,517.62 1,481,648.79
- Besi beton 349.38 Kg 16,885.44 5,899,400.38
#REF! - Mall/bekisting 24.00 M2 244,828.83 5,875,891.98
5 Kolom 30 x 30
- Beton cor k 250 9.07 M3 1,097,517.62 9,954,484.84
- Besi beton 1,659.23 Kg 16,885.44 28,016,792.46
- Mall/bekisting 112.00 M2 244,828.83 27,420,829.24
6 Plat lantai
beton cor 8.10 M3 1,097,517.62 8,889,892.74
besi beton 506.02 Kg 16,885.44 8,544,424.38
bekisting 40.50 M2 284,348.58 11,516,117.59
7 Tangga profil baja 1.00 LS 50,000,000.00 50,000,000.00
8 Plat kanopi
beton cor k 250 0.31 M3 1,097,517.62 340,230.46
besi beton 54.34 Kg 16,885.44 917,601.22
bekisting 12.30 M2 284,348.58 3,497,487.56
9 List profil 30.00 M' 50,000.00 1,500,000.00
10 Pasangan 1 bata camp. 1 : 2 3.96 M3 239,348.75 947,821.05
11 Pasangan 1/2 bata camp. 1 : 2 113.49 M3 77,794.69 8,828,919.08
12 Plesteran camp. 1 : 2 , t = 15 mm 7.92 M² 69,588.44 551,140.43
13 Plesteran camp. 1 : 4 , t = 15 mm 226.98 M² 64,888.44 14,728,377.54
14 Lantai granito 120 x 60 119.50 M² 166,356.02 19,879,544.69
15 dinding babet ### 100.75 M² 525,000.00 52,893,750.00
JUMLAH IC 480,283,260.21
II PEKERJAAN KUSEN DAN JENDELA
1 Pintu panel type P1 2.00 unit 909,892.81 1,819,785.63
2 pintu sorong p1
- rel pintu sorong 1.00 set 651,786.44 651,786.44
- pintu sorong 1.00 unit 1,875,000.00 1,875,000.00
3 handrail stainless steel 14.90 M' 509,250.00 7,589,862.00
4 Rangka furing motif 18.00 unit 87,780.00 1,580,040.00
5 Plafon gyfsum 9 mm motif 18.00 unit 46,244.22 832,396.01
JUMLAH IIC 14,348,870.07
III PEKERJAAN INSTALASI LISTRIK
1 Panel penerangan 1.00 Unit 72,389.94 72,389.94
2 Lampu Downlight 18 watt 11.00 Unit 135,000.00 1,485,000.00
3 lampu TL 45 watt 2.00 Unit 47,028.63 94,057.26
4 saklar tunggal 4.00 Unit 26,649.09 106,596.35
5 AC 1 PK 2.00 Unit 3,500,000.00 7,000,000.00
6 Saklar Ganda 1.00 bh 29,508.71 29,508.71
7 Stop Kontak 5.00 bh 32,138.82 160,694.09
8 Instalasi Listrik 15.00 ttk 134,700.00 2,020,500.00
JUMLAH IIIC 10,968,746.35
IV PEKERJAAN INSTALASI AIR
1 Pipa air bersih PVC Ø 1" 4.00 m 52,274.93 209,099.70
2 pipa air bekas 4'' 9.30 m 95,349.80 886,753.16
3 elbow + sambungan 1'' 8.00 bh 17,284.75 138,278.00
elbow + sambungan 4'' 8.00 bh 105,404.08 843,232.65
4 Err:509 Err:509 m 63,495.00 Err:509
5 Bak tandon 1000 liter 1.00 bh 3,000,000.00 3,000,000.00
6 Floor drains 4.00 bh 127,584.56 510,338.25
JUMLAH IVC Err:509
V PEKERJAAN PENGECATAN
1 Pengecatan Tembok ### 113.49 M2 48,144.24 5,463,889.51
JUMLAH VC 5,463,889.51
D LANTAI III
I PEKERJAAN BETON DAN PASANGAN
1 balok 25 x 50
- Beton cor k 250 13.51 M3 987,977.77 13,347,579.67
- Besi beton 1,629.56 Kg 16,933.95 27,594,901.34
#REF! - Mall/bekisting` 189.11 M2 248,149.11 46,927,478.19
2 balok kubah 20 x 40
- Beton cor k 250 0.50 M3 987,977.77 496,811.68
- Besi beton 166.35 Kg 16,933.95 2,817,037.16
#REF! - Mall/bekisting 3.60 M2 248,149.11 893,336.80
3 Kolom 20 x 20
- Beton cor k 250 ### 0.60 M3 987,977.77 592,786.66
- Besi beton ### 9.91 Kg 16,933.95 167,874.87
- Mall/bekisting 8.00 M2 248,149.11 1,985,192.88
4 Kolom 30 x 30
- Beton cor k 250 ### 1.51 M3 987,977.77 1,493,822.39
- Besi beton ### 5.12 Kg 16,933.95 86,685.02
- Mall/bekisting 4.00 M2 248,121.82 992,487.28
4 pelat lantai
- Beton cor k 250 13.56 M3 987,977.77 13,394,155.77
- Besi beton 787.15 Kg 16,933.95 13,329,511.33
- Mall/bekisting 67.79 M2 287,641.57 19,497,989.28
5 List profil 9.00 M' 54,000.00 486,000.00
6 Dinding babet 49.24 M2 525,000.00 25,851,000.00
7 Pasangan 1 bata campuran 1 : 2 24.80 M2 243,833.00 6,047,058.40
8 Plasteran 1 : 4 tebal 15 cm 49.60 M3 66,385.25 3,292,708.40
9 Tangga profil baja 1.00 Ls 50,000,000.00 50,000,000.00
JUMLAH ID 229,294,417.12
II PEKERJAAN PLAFOND DAN ATAP
1 Kubah
- Beton cor k 250 1.45 M3 987,977.77 1,430,817.63
- Besi beton 160.55 Kg 16,933.95 2,718,819.42
- Mall/bekisting 9.05 M2 248,121.82 2,245,856.93
2 tangga profile baja 1.00 Ls 50,000,000.00 50,000,000.00
JUMLAH IID 56,395,493.99
III PEKERJAAN INSTALASI AIR
1 Pipa air bekas/pipa talangan 77.20 M' 96,115.21 Rp 7,420,094.02
2 elbow+sambungan 40.00 bh 17,284.75 Rp 691,390.00
JUMLAH III D Rp 8,111,484.02
IV PEKERJAAN PENGECATAN
1 Pengecatan Tembok 42.15 M2 36,986.86 1,559,154.66
JUMLAH IV D 1,559,154.66
E LANTAI IV
I PEKERJAAN BETON DAN PASANGAN
1 balok kubah 25 x 50
- Beton cor k 250 5.03 M3 1,105,694.87 5,560,065.64
- Besi beton 244.99 Kg 16,933.95 4,148,629.86
#REF! - Mall/bekisting 65.37 M2 249,246.77 16,293,261.52
2 Kolom 30 x 30
- Beton cor k 250 3.89 M3 1,105,694.87 4,301,153.05
- Besi beton 189.59 Kg 16,933.95 3,210,556.12
- Mall/bekisting 14.40 M2 249,219.48 3,588,760.55
3 kubah
- Beton cor k 250 26.82 M3 1,105,694.87 29,653,683.44
- Besi beton 407.21 Kg 16,933.95 6,895,666.90
- Mall/bekisting 4.53 M2 249,219.48 1,127,896.17
4 tangga 1.00 LS 50,000,000.00 50,000,000.00
5 Dinding Babet 20.48 M2 525,000.00 10,752,000.00
JUMLAH IE 135,531,673.25
III PEKERJAAN PENGECATAN
1 Pengecatan tembok 109.53 M2 37,090.32 4,062,556.01
JUMLAH IIIE 4,062,556.01
F LANTAI V
I PEKERJAAN BETON DAN PASANGAN
1 Kolom 30 x 30
- Beton cor k 250 2.81 M3 1,107,739.19 3,112,747.11
- Besi beton 144.49 Kg 16,966.29 2,451,538.28
- Mall/bekisting 4.80 M2 250,317.15 1,201,522.30
2 Balok 20 x 40 kubah
- Beton cor k 250 0.50 M3 1,107,739.19 557,034.56
- Besi beton 55.45 Kg 16,966.29 940,805.69
- Mall/bekisting 3.14 M2 250,344.44 786,081.53
3 atap kubah
- Beton cor k 250 0.72 M3 1,107,739.19 802,129.77
- Besi beton 80.28 Kg 16,966.29 1,362,005.88
- Mall/bekisting 4.53 M2 250,317.15 1,132,863.88
4 Dinding babet 7.04 M2 550,000.00 3,872,000.00
5 Pasangan 1 bata campuran 1 ; 2 3.20 M2 72,083.13 230,666.00
6 Plasteran 1 ; 4 tebal 15 cm 6.40 M2 67,383.13 431,252.00
JUMLAH IF 16,880,646.98
G PEKERJAAN LANDSCAPE
1 Landscape 1.00 Ls 10,000,000.00 10,000,000.00
2 Cone block 79.84 M2 246,227.40 19,657,564.48
3 Saluran air limbah 1.00 Ls 50,000,000.00 50,000,000.00
JUMLAH G 79,657,564.48
H PEKERJAAN LAIN-LAIN
1 P3K 1.00 - 500,000.00 500,000.00
2 Foto dokumentasi 1.00 - 500,000.00 500,000.00
3 Pembersihan Akhir 1.00 - 500,000.00 500,000.00
JUMLAH H 1,500,000.00
JUMLAH Err:509
DIBULATKAN Err:509
REKAPITULASI
RENCANA ANGGARAN BIAYA
PEMBANGUNAN MASJID AT TAQWIM
JUMLAH JUMLAH
NO URAIAN PEKERJAAN SUB HARGA HARGA
(Rp) (Rp.)
JUMLAH Err:509
DIBULATKAN Err:509
Medan, Desmber 2017
Terbilang: Yang membuat
Satu milyar delapan ratus Lima puluh empat juta rupiah
P x L x T
Volume ( 1 M³ ) = 0.44 1.50 1.5
Pembesian : 0.3
Tulangan Lentur 1 Ø= 14 mm
panjang tulangan = 1.94 m
Jumlah Tul = 30.00 Bh
Berat Kg/M = 1.21 Kg
Berat Total = 70.33 Kg
Tulangan Lentur 2 Ø= 12 mm
panjang tulangan = 1.51 m
Jumlah Tul = 16.00 Bh
Berat Kg/M = 0.89 Kg
Berat Total = 21.45 Kg
begel Ø = 8 mm
panjang tulangan = 1.30 m
Jumlah Tul = 10 Bh
Berat Kg/M = 0.39 Kg
Berat Total = 4.96 kg
tulangan kolom 14 mm
panjang tulangan = 2.15 m
Jumlah Tul = 12 Bh
Berat Kg/M = 1.21 Kg
Berat Total = 31.18 kg
Berat Total Pembesian = 127.91 Kg
Bekesting :
Luas 1 =
Luas 2 = 2.22 M²
Luas Total = 2.22 M²
P x L x T
Volume ( 1 M³ ) = 0.59 1.30 1.3
Pembesian : 0.3
Tulangan Lentur 1 Ø= 14 mm
panjang tulangan = 1.74 m
Jumlah Tul = 26.00 Bh
Berat Kg/M = 1.21 Kg
Berat Total = 54.67 Kg
Tulangan Lentur 2 Ø= 12 mm
panjang tulangan = 1.31 m
Jumlah Tul = 13.00 Bh
Berat Kg/M = 0.89 Kg
Berat Total = 15.12 Kg
begel Ø = 8 mm
panjang tulangan = 1.30 m
Jumlah Tul = 9 Bh
Berat Kg/M = 0.39 Kg
Berat Total = 4.45 kg
tulangan kolom 14 mm
5 panjang tulangan = 2.15 m
Jumlah Tul = 10 Bh
Berat Kg/M = 1.21 Kg
Berat Total = 25.98 kg
Berat Total Pembesian = 100.21 Kg
Bekesting :
Luas 1 =
Luas 2 = 2.22 M²
Luas Total = 2.22 M²
P x L x T
Volume ( 1 M³ ) = 0.93 0.90 1.2
Pembesian : 0.25
Tulangan Lentur 1 Ø= 14 mm
panjang tulangan = 1.34 m
Jumlah Tul = 18.00 Bh
Berat Kg/M = 1.21 Kg
Berat Total = 29.15 Kg
Tulangan Lentur 2 Ø= 12 mm
panjang tulangan = 1.21 m
Jumlah Tul = 12.00 Bh
Berat Kg/M = 0.89 Kg
Berat Total = 12.89 Kg
begel Ø = 8 mm
panjang tulangan = 1.10 m
Jumlah Tul = 10 Bh
Berat Kg/M = 0.39 Kg
Berat Total = 4.32 kg
tulangan kolom 14 mm
5 panjang tulangan = 2.15 m
Jumlah Tul = 10 Bh
Berat Kg/M = 1.21 Kg
Berat Total = 25.98 kg
Berat Total Pembesian = 72.34 Kg
Bekesting :
Luas 1 =
Luas 2 = 1.85 M²
Luas Total = 1.85 M²
P x L x T
Volume ( 1 M³ ) = 1.23 0.90 0.9
Pembesian : 0.25
Tulangan Lentur 1 Ø= 14 mm
panjang tulangan = 1.34 m
Jumlah Tul = 18.00 Bh
Berat Kg/M = 1.21 Kg
Berat Total = 29.15 Kg
Tulangan Lentur 2 Ø= 12 mm
panjang tulangan = 0.91 m
Jumlah Tul = 9.00 Bh
Berat Kg/M = 0.89 Kg
Berat Total = 7.27 Kg
begel Ø = 8 mm
panjang tulangan = 1.10 m
Jumlah Tul = 10 Bh
Berat Kg/M = 0.39 Kg
Berat Total = 4.32 kg
tulangan kolom 14 mm
4 panjang tulangan = 2.15 m
Jumlah Tul = 8 Bh
Berat Kg/M = 1.21 Kg
Berat Total = 20.78 kg
Berat Total Pembesian = 61.52 Kg
Bekesting :
Luas 1 =
Luas 2 = 1.85 M²
Luas Total = 1.85 M²
P x L x T
Volume ( 1 M³ ) = 0.77 1.00 1.3
Pembesian : 0.3
Tulangan Lentur 1 Ø= 14 mm
panjang tulangan = 1.74 m
Jumlah Tul = 20.00 Bh
Berat Kg/M = 1.21 Kg
Berat Total = 42.05 Kg
Tulangan Lentur 2 Ø= 12 mm
panjang tulangan = 0.91 m
Jumlah Tul = 10.00 Bh
Berat Kg/M = 0.89 Kg
Berat Total = 8.08 Kg
begel Ø = 8 mm
panjang tulangan = 1.30 m
Jumlah Tul = 10 Bh
Berat Kg/M = 0.39 Kg
Berat Total = 5.11 kg
tulangan kolom 14 mm
5 panjang tulangan = 2.15 m
Jumlah Tul = 10 Bh
Berat Kg/M = 1.21 Kg
Berat Total = 25.98 kg
Berat Total Pembesian = 81.22 Kg
Bekesting :
Luas 1 =
Luas 2 = 2.22 M²
Luas Total = 2.22 M²
P x L x T
Volume ( 1 M³ ) = 0.33 2.50 1.2
Pembesian : 0.25
Tulangan Lentur 1 Ø= 14 mm
panjang tulangan = 1.94 m
Jumlah Tul = 42.00 Bh
Berat Kg/M = 1.21 Kg
Berat Total = 98.46 Kg
Tulangan Lentur 2 Ø= 12 mm
panjang tulangan = 0.91 m
Jumlah Tul = 25.00 Bh
Berat Kg/M = 0.89 Kg
Berat Total = 20.20 Kg
begel Ø = 8 mm
panjang tulangan = 1.10 m
Jumlah Tul = 19 Bh
Berat Kg/M = 0.39 Kg
Berat Total = 8.39 kg
tulangan kolom 14 mm
5 panjang tulangan = 2.15 m
Jumlah Tul = 20 Bh
Berat Kg/M = 1.21 Kg
Berat Total = 51.96 kg
Berat Total Pembesian = 179.00 Kg
Bekesting :
Luas 1 =
Luas 2 = 1.85 M²
Luas Total = 1.85 M²
P x L x T
Volume ( 1 M³ ) = 0.43 1.30 1.79
Pembesian : 0.25
Tulangan Lentur 1 Ø= 14 mm
panjang tulangan = 1.94 m
Jumlah Tul = 26.00 Bh
Berat Kg/M = 1.21 Kg
Berat Total = 60.95 Kg
Tulangan Lentur 2 Ø= 12 mm
panjang tulangan = 1.51 m
Jumlah Tul = 17.90 Bh
Berat Kg/M = 0.89 Kg
Berat Total = 24.00 Kg
begel Ø = 8 mm
panjang tulangan = 1.10 m
Jumlah Tul = 20 Bh
Berat Kg/M = 0.39 Kg
Berat Total = 8.65 kg
tulangan kolom 14 mm
5 panjang tulangan = 2.15 m
Jumlah Tul = 20 Bh
Berat Kg/M = 1.21 Kg
Berat Total = 51.96 kg
Berat Total Pembesian = 145.55 Kg
Bekesting :
Luas 1 =
Luas 2 = 1.85 M²
Luas Total = 1.85 M²
ELEMEN STRUKTUR PONDASI SETEMPAT p24b 245 x 110
,
P x L x T
Volume ( 1 M³ ) = 0.37 2.45 1.1
Pembesian : 0.3
Tulangan Lentur 1 Ø= 14 mm
panjang tulangan = 1.34 m
Jumlah Tul = 40.00 Bh
Berat Kg/M = 1.21 Kg
Berat Total = 64.77 Kg
Tulangan Lentur 2 Ø= 12 mm
panjang tulangan = 1.51 m
Jumlah Tul = 11.00 Bh
Berat Kg/M = 0.89 Kg
Berat Total = 14.75 Kg
begel Ø = 8 mm
panjang tulangan = 1.30 m
Jumlah Tul = 20 Bh
Berat Kg/M = 0.39 Kg
Berat Total = 10.23 kg
tulangan kolom 14 mm
5 panjang tulangan = 2.15 m
Jumlah Tul = 20 Bh
Berat Kg/M = 1.21 Kg
Berat Total = 51.96 kg
Berat Total Pembesian = 141.70 Kg
Bekesting :
Luas 1 = 1.85
Luas 2 = 2.22 M²
Luas Total = 4.07 M²