Architect I Enginering I Consultant I Contractor
Informasi Aktivasi & konsultasi, silahkan contact email : ms.arsitek@gmail.com Lt1

Software RAB Exarch xPRO v6.0 Software RAB Acuan AHSP PUPR Bidang IV CIPTA KARYA &
Standar Nasional Indonesia (SNI)
MENU UTAMA KALKULATOR RAB 2020
711,239,810 995,735,735
Upah 197.50 Bahan 478.25 Alat 35.49
A B C D E F (jt) (jt) (jt)
276.50 669.56 49.68
Harga Acuan Provinsi :
Dashboard Data Project BQ CalcuxPro Basic Price AHSP PU-
Jenis Bangunan :
SNI

G H I J K L Grade Bangunan :
min
Mutu Bahan : Mutu Struktur : max
HS Report AHS Report Detail Report Gantt Chart Curva S Matrix Item G1 K1
Lt1 Lt2 Lt3 Lt4
100.0 90.0 - -
M N O P Q R

Calendar Rekap AHSP Top Brand Info UMP Panduan Disclaimer


DISCLAIMER
Software ini merupakan perangkat (tools) untuk melakukan perhitungan RAB, berisi analisa harga satuan dan format
perhitungan RAB. Dirancang sedemikian rupa untuk membantu dan memudahkan pekerjaan perhitungan RAB.
Pengguna Wajib memahami bahwa perangkat ini tidak bisa mewakili seluruh kebutuhan pengguna di seluruh Indonesia.
Dalam penerapannya, perhitungan harus tetap diesuaikan dengan spesifikasi teknis serta penerapan pertimbangan teknis
(Engineering Judgement) sesuai ketentuan yang berlaku
Terkait dengan hal tersebut, pengguna wajib memahami keterbatasan perangkat dan secara mandiri harus melakukan
justifikasi teknik serta bertanggung jawab penuh atas hasilnya
Pihak Pengembang Software tidak bertanggung jawab atas segala akibat yang merugikan terkait penggunan perangkat ini,
serta terbebas dari tuntutan yang ada.

Setelah membaca dan memahami discalimer diatas, silahkan klik pilihan untuk menyetujui

SETUJU
TENTANG HAK CIPTA DAN KARYA

Hak cipta dilindungi undang-undang. Dilarang memperbanyak sebagian atau seluruh isi software ini dalam bentuk apapun baik secara
electronik maupun mekanik, termasuk mencopy, merekam atau menggunakan sistem/metode lainnya, tanpa izin tertulis dari author /developer
software

UNDANG-UNDANG NO 19 Thn 2002 Tentang HAK CIPTA

1. Barang siapa dengan sengaja dan tanpa hak mengumumkan atau memperbanyak suatu ciptaan atau memberi izin untuk itu, dipidana dengan
pidana penjara paling lama 7 (tujuh) tahun dan/atau denda paling banyak Rp 5.000.000.000 (lima miliar rupiah)

2. Barang siapa dengan sengaja menyiarkan, memamerkan, mengedarkan atau menjual kepada umum suatu ciptaan atau barang hasil
pelanggaran hak cipta atau hal terkait sebagaimana dimaksud pada ayat (1), dipidana dengan pidana penjara paling lama 5 (lima) tahun dan/atau
denda paling banyak Rp 500.000.000 (Lima ratus Juta rupiah)

TENTANG DEVELOPER DAN PEMEGANG HAK KARYA


Software RAB Exarch xPro v6.0
Developer Software by Bapak Aswar,ST, M.T
Tahun Penyusunan Software : 10 Januari 2017 (Update 1 April 2020)
CV. Mitra Sulawesi
Nomor TDP : 503/0433/TDPCV-B/13/KPAP
Nomor SIUP : 503/0433/SIUPK-B/13/KPAP
www.mitra-arsitek.com
DILARANG KERAS mengubah, memodifikasi, memperjual belikan, mencuri data atau segala tindakan melanggar hak cipta/hak karya
tanpa izin tertulis dari CV.Mitra Sulawesi (mitra-arsitek.com)
This shape represents a slicer.
SlicersBiaya
are supported in Excel
Total Biaya Biaya Upah Biaya Bahan
2010 or later.
Alat

100,00% 722.863.124 30,0% 216.583.855 68,9% 497.895.444 1,2% 8.383.825


If the shape was modified in
Hari ini : Senin 29 Maret 2021 an earlier version of Excel, or
8,092,696 65,989,67
if the workbook was saved in
xPRO v6.0 Dashboard
2
Excel 2003 or earlier, the

Biaya Sumber Daya


This shape represents a

Biaya Pekerjaan
slicer. Slicers are supported 43,939,51
39,620,76
slicer cannot be used.
7
Markup Upah : 0.0% Markup Alat : 0.0% in Excel 2010 or later. 4,686,500 0 This 33,1
shape represents32,997,35
80,00 a slicer.
0
Markup Bahan : 0.0% PPn : 10.0% 2,662,500
Slicers are supported1 in Excel
If the shape was modified 2010 or later.
TOTAL BIAYA RAB in an earlier version of 1,043,348
133,675
Excel, or if the workbook 9,1% 6,1% 5,5% If the shape
4,6% was modified
4,6% in
722.863.124 was saved in Excel 2003 or an earlier version of Excel, or
A01 A02 A03 B01 B02 M.16 M.12 M.107 M.83 L.3
3,615 jt x 200 m2 earlier, the slicer cannot be if the workbook was saved in
This
used.shape represents a DAFTAR PEKERJAAN Excel 2003 or earlier, the
This shape represents a slicer.
Biaya Upah slicer. Slicers are supported slicer cannot be used.
No %rab Biaya Kode Nama Pekerjaan Slicers are supported in Excel
216.583.855 in Excel 2010 or later.
30,0% 1 0.37% 2,662,500 A01 [ 150 m2 / 4 hari ] Pembersihan Area/Lokasi Kerja 2010 or later.
1,083 jt x 200 m2
Biaya Bahan If the shape was modified 2 0.65% 4,686,500 A02 [ 52 m1 / 2 hari ] Pengukuran dan Pemasangan Bowplank
If the shape was modified in
in an earlier version of 3 1.12% 8,092,696 A03 [ 1 Unit / 1 hari ] Pembuatan Gudang Bahan
497.895.444 an earlier version of Excel, or
68,9% Excel, or if the workbook
4 0.14% 1,043,348 B01 [ 12,3 m3 / 2 hari ] Pekerjaan Galian Pile Cap if the workbook was saved in
2,49 jt x 200 m2 was saved in Excel 2003 or
5 0.02% 133,675 B02 [ 0,5 m3 / 1 hari ] Urugan Pasir Pile Cap Excelshape
This 2003represents
or earlier, atheslicer.
Biaya Alat earlier, the slicer cannot be
This slicer cannot
Slicers be used.in Excel
are supported
8.383.825 used.shape represents a DAFTAR PEMAKAIAN SUMBER DAYA
1,2% slicer. Slicers are supported 2010 or later.
0,042 jt x 200 m2 in Excel 2010 or later. No Jumlah Biaya Kode Nama Item Keterangan/Bobot
2 6,599.0 65,989,672 M.16 Besi beton ( kg ) If the
SNI shape was
07-2052-2002 ( r modified in ###
=7850 kg/m3)
Waktu Pelaksanaan
If the shape was modified 3 33,799.6 43,939,517 M.12 Semen ( kg ) an
SNI earlier version
15.2049.1994 of 50kg/zak)
(Lokal Excel, or### 0.06
123 S 7-Apr-20 in an earlier version of
Excel, or if the workbook
4 17.2 39,620,760 M.107 Papan Kayu 2x20-K.III ( m3 ) if the2x20
Papan Kayu workbook
Kualitas IIIwas
Kayusaved
Excel 2003 or earlier, the
in###
Meranti 0.05
1,627 m2 / hari F 7-Aug-20 5 165.9 33,180,000 M.83 Keramik Lantai 60x60 ( Bh ) Roman 60 x 60 Golongan C### 0.05
was saved in Excel 2003 or slicer cannot be used.
earlier, the slicer cannot be 6 330.0 32,997,351 L.3 Tukang Batu ( OH ) 4 orang### 0.05
used.
FORMULIR DATA PROJECT

No Registrasi Project : A002/T100.80/I-2020


Nama Project : Pembangunan Rumah Tinggal 2 Lantai Type 200
Tahun : 2020
Kota dan Provinsi : Malili, Kab.Timur, SULSEL
Lokasi Project : Jl. Ebony Raya No. 77, Komp. Villa Danau Matano, Kab. Luwu Timur

A DATA PEMILIK
Nama Pemilik : Ibu Isnawaty
No HP : 08114231031
E-Mail : isnawaty.aswar@gmail.com
Alamat : Jl. Ebony Raya No. 77, Komp. Villa Danau Matano, Kab. Luwu Timur, SULSEL

B DATA TEKNIS HUNIAN-PROJECT TECHNICAL


Jenis Proyek - Project Type : Bangunan Pribadi (Rumah Tinggal)
Jumlah Tingkat - Floor Grade : 2 Lantai
Konsep - Concept : Rumah Modern Minimalis
Ukuran Lahan : 20x40 ( 800 m2)
Luas Hunian Efektif (m2) : 200
Arah Hadap : Selatan
Jumlah Penghuni : 3 Orang
Warna Eksterior : Putih, Coklat, Grey dan Merah
Warna Interior : Putih, Kuning Cream, Ungu Muda
Project Mulai- Project Start : Monday, February 04, 2019
Keterangan- Project Note : Project Harus dikerjakan dalam periode 210 hari Calender (7 Bulan)

C SPESIFIKASI TEKNIS
Pondasi : Pondasi Setempat (Telapak Beton) + Pondasi Lajur Batu Kali
Struktur Beton : Beton Betulang (Kualitas K225) + Besi Beton Standar SNI
Dinding : Batu Bata + Plester + Aci + Plamir dan Cat Emulsi
Finishing Lantai : Homogenius Tile Polished (60x60, 40x40,)
Finishing Dinding : Finishing Cat Emulsi (R.Utama), Dinding Keramik 20x40 (WC)
Atap : Rangka Baja Ringan Galvanish+ Metal Spandek
Kusen : Kayu Kualitas 1 atau Setara
Daun Pintu : Kayu Kualitas 1 atau Setara, Panel Pintu PVC (WC)
Daun Jendela : Jendela Geser Aluminium
Plafond : Rangka Hollow Galvanish dan Gypsum Board
Dapur : Meja Beton Lapis Keramik (Granit 80x80)
Sanitary : Kloset Duduk, Kloset Jongkok, Shower, Jet Washer, Kran, Wastafel
Carport : Rabat Beton K200
Listrik : 2000 Watt (10 A) sumber PLN
Air Bersih : PDAM + Pompa dan Tangki 1000 L
Perangkat Penunjang : AC 1/2 PK, Water Heater, Exhaust Fan (Dapur), Telephone, Kamera CCTV
Merk Penunjang : Semen (TONASA/Tiga Roda), Baja Ringan (TASO/BMT) Atap (SakuraRoof/Ondulin),
Sanitasi ( American Standar/Toto), Keramik (ROMAN, ASIA TILE, Platinun) ,
Electrikal (Philips/Brocco), Other Device ( Panasonic, Samsung)

D PROFIL PERUSAHAAN / INSTANSI / KONTRAKTOR


Nama Perusahaan/Instansi : CV. Mitra Sulawesi
Kota dan Provinsi : Makassar, Sulawesi Selatan
Bidang Usaha : Architect -Enginering - Consultant - Kontraktor - Suplier
Nama Pimpinan/Direktur : Bapak Ewah Setiawan
Perencana Project : Aswar,ST

4/396
DAFTAR HARGA SATUAN DASAR (BASIC PRICE)

Update : Thn 2020

Harga
NO Nama Item Kode Item Satuan Keterangan
Satuan
A. DAFTAR PEKERJA DAN UPAH KERJA
1 Pekerja L.1 oh 85,000 Grade Skill 4-Semi Terampil/Terlatih
2 Tukang Atap L.2 oh 100,000 Grade Skill 3-Terampil/Semi Expert
3 Tukang Batu L.3 oh 100,000 Grade Skill 3-Terampil/Semi Expert
4 Tukang Besi L.4 oh 100,000 Grade Skill 3-Terampil/Semi Expert
5 Tukang Cat L.5 oh 100,000 Grade Skill 3-Terampil/Semi Expert
6 Tukang Kayu L.6 oh 100,000 Grade Skill 3-Terampil/Semi Expert
7 Tukang Listrik L.7 oh 100,000 Grade Skill 3-Terampil/Semi Expert
8 Tukang Pipa L.8 oh 100,000 Grade Skill 3-Terampil/Semi Expert
9 Kepala Tukang L.9 oh 150,000 Grade 2-Expert Skill
10 Mandor L.10 oh 185,000 Grade 1-Leader & Professional Skill
. -
. Tukang ereksi L.11 oh 160,181 Grade Skill 3-Terampil/Semi Expert
. Tukang gambar L.12 oh 160,181 Grade Skill 3-Terampil/Semi Expert
. Tukang Interior L.13 oh 160,181 Grade Skill 3-Terampil/Semi Expert
. Tukang Las L.14 oh 160,181 Grade Skill 3-Terampil/Semi Expert
. Tukang Las Konstruksi L.15 oh 160,181 Grade Skill 3-Terampil/Semi Expert
. Tukang Prodo L.16 oh 160,181 Grade Skill 3-Terampil/Semi Expert
. Tukang Ukir L.17 oh 160,181 Grade Skill 3-Terampil/Semi Expert
. Tukang vibrator L.18 oh 160,181 Grade Skill 3-Terampil/Semi Expert
. Tukang Gali L.19 oh 160,181 Grade Skill 3-Terampil/Semi Expert
. Tukang gali sumur L.20 oh 160,181 Grade Skill 3-Terampil/Semi Expert
. Operator alat berat L.21 oh 131,578 Grade 3-Terlatih dan Terampil
. Operator Alat Pipa L.22 oh 131,578 Grade 3-Terlatih dan Terampil
. Operator crane L.23 oh 137,298 Grade 3-Terlatih dan Terampil
. Pembantu operator crane L.24 oh 114,415 Grade 4-Terlatih
. Asisten Ahli Ukur L.25 oh 205,948 Grade 4-Terlatih
. Tukang besi konstruksi L.26 oh 161,000 Grade Skill 3-Terampil/Semi Expert
-
-
DAFTAR ITEM UMUM
BAHAN ALAM -
11 Air M.1 Ltr 50 Sesuai Standar (SNI 03-6861.1-2002)
12 Bata merah M.2 Bh 650 SNI 15-2094-1991 (min. 23x11x5), 3kg/bh
. Batako M.3 bh 3,850 SNI 03-0349-1989 (min.36x18x8)
13 Batu alam / tempel M.4 m2 185,000 Batu Alam Andesit 10cmx20cm-2cm
14 Batu belah M.5 m3 250,000 Grade A (Size 20-30 cm)
. Ijuk M.6 m3 210,000 Bahan Ijuk Rajutan Kualitas baik
15 Kerikil M.7 m3 220,000 Aggregat Kasar 1-3 cm, SNI 03-2834-2000
16 Pasir beton M.8 m3 250,000 SNI 02-6820-2002 (max 5mm,sisi tajam)
17 Pasir pasang M.9 m3 255,000 SNI 02-6820-2002 (max 0.63-5mm, 5%)
18 Pasir urug M.10 M3 200,000 (SNI) 03-6820-2002 (max 5mm,biasa)
19 Plamir M.11 Kg 12,000 Propan Eco Emulsion Plamir (5kg)
20 Semen M.12 Kg 1,300 SNI 15.2049.1994 (Lokal 50kg/zak)
21 Semen Warna M.13 Kg 15,000 AM 53 Tile Grout
22 Tanah urug M.14 m3 160,000 Kualitas baik ,tanah liat dan buckling <12%
. BAHAN BESI -
23 Baja strip (0,2 x 2) cm M.15 Kg 12,500 BESI PLAT STRIP 5x30 lebar 2,2 tebal 2mm
24 Besi beton M.16 Kg 10,000 SNI 07-2052-2002 ( r =7850 kg/m3)
. Besi Ø10 (Polos) M.17 m1 6,364 KS CILEGON SNI 10 MM, 7.4kg/btg
. Besi Ø12 (Polos) M.18 m1 9,273 KS CILEGON SNI 12 MM,10.66kg/btg
. Besi Ø13 (Ulir) M.19 m1 9,364 Besi Beton D 13 IBD SNI ( Ulir ),12.48kg/btg
. Besi Ø16 (Ulir) M.20 m1 14,091 Besi Beton D 16 IBD SNI ( Ulir ),18.96kg/btg
. Besi Ø6 (Polos) M.21 m1 2,091 Besi Beton TARIK 6 mm, 2.66kg/btg
25 Besi Ø8 (Polos) M.22 m1 4,091 KS CILEGON SNI 8 MM, 4.74kg/btg
26 Hollow 2/4 M.23 M1 12,500 Hollow 20 x 20 x 1.10 mm,4m
27 Hollow 2/4 Galvanish M.24 M1 5,000 Hollow Plafon Galvanis 20×40 4m, 0.8 mm

Software RAB Exarch xPro 5/396


28 Hollow 4/4 M.25 M1 23,250 Hollow 40 X 40 X 1.10 mm, 4m
29 Hollow 4/4 Galvanish M.26 M1 7,000 Hollow Plafon Galvanis 20×40 4m, 0.8 mm
30 Kawat beton M.27 Kg 23,500 SNI 1155:2011 (BWG 20 , Ø 0.9 mm)
31 Pelat 1/8" M.28 m2 265,000 MS Plat 4' x 8'x 1/8" (3.2mm)
32 Hollow SS 20x40 M.29 m1 58,333 Blue Star Stainless Steel 20x40-Tebal 1mm
33 Hollow SS 40x40 M.30 m1 83,333 Blue Star Stainless Steel 40x40-Tebal 1mm
34 Grounding Rod M.31 btg 650,000 Batang Tembaga Diameter (5/8" - 1/2") -2 meter
35 Pipa SS Dia.2" M.32 m1 82,500 Pipa SS304 2"x tebal 1mm -6 meter
. -
. BAHAN ATAP -
36 Atap Genteng Metal M.33 bh 112,000 Multi Roof Metal Pasir 2x5-0.40 ,0.77mx1m
. Atap Spandek M.34 m1 75,000 Spandek CBM t0.30mm x L1.00m x4.5m
37 Baja Ringan-Reng Truss M.35 m1 6,667 TASO Reng 32.45 ,Tinggi 32mm, 0.45. P 6m
38 Baja Ringan-C Truss M.36 m1 13,333 TASO Truss C75.75 SNI T. 0.75 TCT, P6m
39 Nok genteng metal M.37 Bh 83,000 Nok Genteng Metal Pasir P 80 cm
. Nok Zincalume M.38 m1 30,000 Nok Atap Spandek Zincalume 3 m x 0.3 m -0.35mm
40 Talang Jurai M.39 M' 25,000 Talang Jurai Galvalume 3mx0.35m-0.35mm
. BAHAN PEMIPAAN DAN SANITASI -
41 Dop 3" M.40 bh 35,000 Dop Rucika 3"
42 Floor drain M.41 Unit 60,000 TOTO SS Floor Drain 10 x 10 x 2.5 cm
. Kitchen Sink M.42 unit 2,100,000 Modena Sink KS 4200
43 Kloset Duduk M.43 Unit 2,500,000 TOTO 420 Ecowasher (72cmx36cm-75cm)
44 Kloset Jongkok M.44 Unit 250,000 Kloset Jongkok TOTO CE 7 (55cmx44cm)
45 Kran air M.45 unit 25,000 ONDA Kran Air CLS 3/4 inch
46 Pipa PVC 1/2" M.46 m1 4,000 WAVIN PVC AW -1/2"
47 Pipa PVC 1” M.47 m1 6,000 WAVIN PVC AW -1"
. Pipa PVC 2” M.48 m1 7,000 WAVIN PVC AW -2"
48 Pipa PVC 3" M.49 m1 8,000 WAVIN PVC AW -3"
49 Pipa PVC 3/4" M.50 m1 5,500 WAVIN PVC AW -3/4"
50 Pipa PVC 4" M.51 m1 9,000 WAVIN PVC AW -4"
51 Shower Mandi M.52 Unit 460,000 PALOMA SSP 2308 Shower Set
52 T Bow 3" M.53 bh 35,000 Wavin T-Bow 3"
53 T Bow 4" M.54 bh 65,000 Wavin T-Bow 4"
54 Wastafel M.55 Unit 1,050,000 Wastafel Toto L38 V1, Ukuran 50x30cm
. -
. BAHAN LEMBARAN DAN PELAPIS -
55 Gypsum board 9 mm M.56 lbr 87,000 Gypsum Jayaboard 120x240-9mm
. List Plafon M.57 M' 34,000 Shunda Plafon LS30
. Plywood 120x240 tbl. 4 mm M.58 Lbr 90,000 Triplek / Plywood Full Meranti Grade A - 4 mm
. Plywood 120x240 tbl. 6 mm M.59 Lbr 130,000 Triplek / Plywood Full Meranti Grade A - 6 mm
56 Plywood 120x240 tbl. 9 mm M.60 Lbr 175,000 Triplek / Plywood Full Meranti Grade A - 9 mm
57 Seng Gelombang 3" x 6" BJLS 28 M.61 Lbr 70,000 Seng BJLS GAJAH SURYA–-0,3 mm x 180 cm
58 Tripleks M.62 Lbr 85,000 Triplek / Plywood Full Meranti Grade A - 3 mm
. BAHAN CAT -
59 Cat Dasar Tembok (Exterior) M.63 kg 39,286 Cat Dasar Exterior Dulux Alkali 20kg/pail
60 Cat Dasar Tembok (Interior) M.64 kg 26,190 Cat Dasar Interior Dulux Alkali 21kg/pail
61 Cat Tembok (Exterior) M.65 kg 24,000 Dulux Catylac Exterior 912D 25kg/pail
62 Cat Tembok (Interior) M.66 kg 20,000 Dulux Catilac Interior 911A 25 kg/pail
63 Cat Plafon M.67 kg 32,500 Dulux Pentalite Ceiling 20 kg/pail
64 Cat Waterproofing M.68 kg 50,000 Dulux Cat Waterproofing Aquashield 20kg
65 Cat meni M.69 Kg 16,300 RJ ZINC CHROMATE Cat Meni
66 Cat Besi M.70 kg 48,000 AVIAN Cat Kayu dan Besi 1kg/can
67 Cat Dasar Kayu/Besi M.71 Kg 65,000 Propan acrylux primer water based
68 Cat kayu M.72 kg 60,000 AVIAN Cat Kayu dan Besi 1kg/can
69 Tinner M.73 ltr 60,000 JOTUN Thinner 5L/can
. -
. BAHAN KERAMIK DAN PORSELEN -
70 Ballnose Rope Tile 2.5x20 M.74 bh 2,500 Keramik Kuku Macan / Bon-bon, Size 2.5x 20cm
71 Keramik Dinding 20x40 M.75 m2 85,000 Roman 20 x 40 Golongan B
. Keramik Dinding 20x60 M.76 m2 140,000 Roman 20 x 60 Golongan B
. Keramik Dinding 30x60 M.77 m2 175,000 Roman 30 x 60 Golongan B
. Keramik Dinding 40x60 M.78 m2 195,000 Roman 40 x 60 Golongan B
. Keramik Lantai 10x10 M.79 m2 55,000 Roman 10 x 10 Golongan A

Software RAB Exarch xPro 6/396


. Keramik Lantai 20x20 M.80 m2 87,000 Roman 20 x 20 Golongan A
72 Keramik Lantai 30x30 M.81 m2 95,000 Roman 30 x 30 Golongan B
73 Keramik Lantai 40x40 M.82 m2 105,000 Roman 40 x 40 Golongan A
74 Keramik Lantai 60x60 M.83 m2 200,000 Roman 60 x 60 Golongan C
. Marmer 100x100 M.84 m2 450,000 Marmer Ukuran 100cmx100cm
. Plint Keramik 10x30 M.85 bh 5,000 Cutting Tile Roman 30 x 30 Golongan B
. Plint Keramik 10x40 M.86 bh 7,500 Cutting Tile Roman 40 x 40 Golongan A
75 Plint Keramik 10x60 M.87 bh 12,000 Cutting Tile Roman 60 x 60 Golongan C
. BAHAN LISTRIK -
76 Kabel NYM 3x2,5 mm2-SNI M.88 m1 10,400 Supreme NYM 3 x 2,5, 50 m/roll
77 Kabel NYM 2x1,5 mm2-SNI M.89 m1 5,600 Supreme NYM 2 x 1,5, 50m/roll
78 Saklar Listrik M.90 unit 25,000 Saklar Listrik Brocco
79 Receiptackle M.91 unit 30,000 Stop Kontak Dinding Listrik Brocco
80 MCB + Box M.92 Unit 350,000 Schneider MCB 10 A + Vetto MCB Box
81 Fitting Lampu M.93 bh 25,000 Fitting Lampu Brocco
. -
. BAHAN KAYU -
82 Balok Kayu 2x3-K.II M.94 m3 2,200,000 Balok 2x3 Kualitas II Kayu Meranti
. Balok Kayu 2x3-K.III M.95 m3 1,800,000 Balok 2x3 Kualitas III Kayu Meranti
83 Balok Kayu 3x4-K.II M.96 m3 2,800,000 Balok 3x4 Kualitas II Kayu Meranti
. Balok Kayu 3x4-K.III M.97 m3 2,100,000 Balok 2x4 Kualitas III Kayu Meranti
84 Balok Kayu 4x6-K.II M.98 m3 3,100,000 Balok 4x6 Kualitas II Kayu Meranti
85 Balok Kayu 5x10-K.I M.99 m3 6,500,000 Balok 5x10 Kualitas I Kayu Meranti
86 Balok Kayu 5x10-K.II M.100 m3 3,500,000 Balok 5x10 Kualitas II Kayu Meranti
. Balok Kayu 8x15-K.I M.101 m3 7,500,000 Balok 8x15 Kualitas I Kayu Meranti
. Balok Kayu 8x15-K.II M.102 m3 3,300,000 Balok 8x15 Kualitas II Kayu Meranti
. Bambu Ø 6 - 8 / 600 cm M.103 btg 18,000 Bambu Petung /Bambu Batu Ø6-Ø8
87 Dolken kayu Ø 8-10/400 cm M.104 btg 25,000 Dolken/Gelam Kayu Ø8
88 Papan Kayu 2x20-K.I M.105 m3 8,700,000 Papan Kayu 2x20 Kualitas I Kayu Meranti
89 Papan Kayu 2x20-K.II M.106 m3 4,500,000 Papan Kayu 2x20 Kualitas II Kayu Meranti
90 Papan Kayu 2x20-K.III M.107 m3 2,300,000 Papan Kayu 2x20 Kualitas III Kayu Meranti
. BAHAN PENGIKAT DAN PENDUKUNG -
91 Baut M10 M.108 bh 5,000 Baut Metrik 10 hitam+Nut
92 Baut Ramset / Dina Bolt M.109 bh 15,000 Dynabolt d12x120mm
93 Paku Biasa ½" - 1" M.110 Kg 23,500 Paku Ukuran 1 cm sd 2.5 cm
94 Paku Biasa 2" - 5" M.111 Kg 25,000 Paku Ukuran 5 cm sd 13 cm
95 Paku sekrup M.112 bh 750 Tapping FAB SS 304- 9mm , d4mm
96 Screw M.113 bh 500 Sekrup Tapping Baja Putih 13mm-d5 mm
97 Truss Screw M.114 bh 750 Self Drilling Screw d6x20 mm (Sekrup Rangka Baja)
. Roof Bottom Screw M.115 bh 550 Self Drilling Screw d4x16 mm (Roof /Bottom Screw)
98 Suspension Rod M.116 bh 6,000 Suspension Rod 3mm PN 409
. BAHAN BETON DAN CETAKAN -
99 Buis beton D. 80 cm M.117 bh 62,000 Buis Beton D80, tebal 5cm, Mutu K200
100 Paving block 6 cm M.118 M2 135,000 Paving Blok Straight 6x11x21, Mutu K200 (min)
. BAHAN PINTU JENDELA & KACA -
101 Pintu Utama (Kusen+Panel) Type P1 M.119 set 2,100,000 Kualitas Kayu Jati-2 Ganda. 2x70-2meter
102 Pintu Utama (Kusen+Panel) Type P2 M.120 set 1,600,000 Kualitas Kayu Jati- Tunggal. 80x200
103 Pintu Utama (Kusen+Panel) Type P3 M.121 set 1,100,000 Pintu PVC- Tunggal. 70x190
104 Jendela Type J1 M.122 set 980,000 Jendela Ganda Ukuran 2x45x160
105 Jendela Type J2 M.123 set 600,000 Jendela Tunggal Ukuran 45x160
. Jendela Type J3 M.124 set 2,500,000 Jendela Sudut Ukuran 100x110x160
106 Engsel pintu M.125 Bh 17,000 PALOMA BHP 703 ECO 4"X3MM 4BB SSS
107 Lubang Angin M.126 Unit 25,500 Bovenlight Beton Ukuruan 20x30
. PAKET KOMPONEN SATUAN -
108 Air Conditioner M.127 unit 4,800,000 AC DAIKIN FLASH INVERTER 1PK FTKQ25
109 Exhaust Fan M.128 unit 300,000 Exhaust Fan MASPION MV-200 NEX
110 Lampu 15W M.129 unit 39,000 PHILIPS LAMPU TORNADO 20W
111 Lampu 20W M.130 unit 45,000 PHILIPS LAMPU TORNADO 20W
112 Lampu 5W M.131 unit 24,000 PHILIPS LAMPU TORNADO 5W
113 Pompa Air M.132 Unit 800,000 SHIMIZU Jet-100 BIT-100 watt, Semi Jet
. Tangki Air M.133 Unit 1,200,000 Tangki Air 1000 Lt, Merk Excel
. -
. BAHAN LAINNYA -

Software RAB Exarch xPro 7/396


114 Amplas M.134 Lbr 3,500 Amplas Taiyo Grade 150-200
115 Instalasi PDAM M.135 Ls 2,300,000 Instalassi PDAM Golongan 3A
116 Jendela nako (rangka + kaca 5 mm) M.136 m2 55,000 Jendela Nako+kaca 5mm
117 Kawat las listrik M.137 Kg 135,000 NIKKO STEEL NSN308 2 MM, Stainless Steel
118 Kuas M.138 Bh 17,000 Kuas Cat 2"
119 Listrik PLN M.139 Ls 2,500,000 Instalasi 2200 VA
120 List kayu profil M.140 m 2,870 List Kayu Profil Motif
121 Minyak bekisting M.141 Ltr 45,750 FOSROC Reebol 20 liter
122 Pohon Perdu M.142 unit 500,000 Pohon Palm Usia 1-2 Tahun
123 Rol Cat M.143 unit 25,000 Roll Cat 1 Feet
124 Sealtape M.144 bh 4,500 Sealtape Merk Onda
. -
. -
. PERLENGKAPAN DAN ALAT BANTU -
125 Alat Bantu Kerja Paving Blok A.1 Ls 210,000
. Alat Bantu Pengelasan A.2 Ls 25,000
. Alat Bantu Rangka Baja Ringan A.3 Ls 450,000
126 Perlengkapan Umum A.4 Ls 250,000
127 Perlengkapan Umum Pipa A.5 Ls 20,000
128 Sewa alat las A.6 Jam 150,000
-
B. DAFTAR ALAT DAN SEWA ALAT -
. Bahan Pasang Dinding Bata Ringan A.7 Ls 210,000
. Bahan potong pipa T1/manual (gergaji) A.8 hari 240,000
. Bahan potong pipa T2/mekanik / cilinder A.9 hari 650,000
. Mobile crane =< 3 ton A.10 hari 1,050,000
. Penjaga jarak bekisting / spacer A.11 bh 4,500
. Peralatan Pasang Dinding Bata Ringan A.12 Ls 245,000
. Perancah kayu A.13 m3 1,350,000
. Perlengkapan Badkip A.14 Ls 150,000
. Perlengkapan Bak A.15 Ls 150,000
. Perlengkapan Kloset A.16 Ls 150,000
. Perlengkapan Pipa A.17 Ls 50,000
. Perlengkapan Urinoir A.18 Ls 150,000
. Perlengkapan Wastafel A.19 Ls 150,000
. Scafolding A.20 sewa-unit 25,000
. Sewa alat perakitan baja A.21 Jam 65,000
. Sewa alat Perakitan Baja IWF A.22 Jam 65,000
. Sewa alat ukur A.23 hr 65,000
. Sewa crane A.24 unit hari 1,232,000
. Sewa excavator type 225 kap 0,5 -1,0 m3 A.25 hari 1,722,000
. Sewa Genset 1500 watt A.26 hari 315,000
. Sewa pipe support A.27 Buah hari 320,000
. Sewa Pompa Submersible 3m3/h A.28 hari 287,000
. Sewa Tripot/Tackel & handle crane 2 T A.29 hari 472,500
. Sewa Perlengkapan Gerinda A.30 jam 45,000
. Sewa mesin gerinda potong A.31 hari 125,000
. -
-
C. DAFTAR BAHAN DAN HARGA BAHAN -
. KELOMPOK AIR, TANAH, BATU DAN SEMEN -
. Air test (air bersih) M.1000 m3 50,000 Menurut SK SNI S-04-1989 F
. Alang-alang M.1001 Ikat 550
. Alkasit M.1002 kg 45,000
. Bata ringan tebal 7,5 cm M.1003 m3 2,814,815
. Bata berongga M.1004 bh 1,500
. Bata pelapis Dinding 3cm x 7cm x 24cm M.1005 Bh 750
. Bata rooster M.1006 bh 750
. Batu apung M.1007 kg 29,920
. Batu granit M.1008 Kg 15,000
. Batu paras M.1009 m2 105,000 Ukuran 20x20x1,4cm
. Batu paras Dinding M.1010 Bh 12,000 Ukuran 20x40x1,4cm
. Batu pecah 2/3 M.1011 m3 350,000 Ukuran 2-3 cm

Software RAB Exarch xPro 8/396


. Batu teraso M.1012 Kg 2,400
. Kapur M.1013 m3 353,500
. Kapur padam M.1014 m3 82,300
. Kapur Pasang M.1015 m3 490,000
. Kapur sirih M.1016 Kg 13,200
. Kerikil (kg) M.1017 kg 150
. Koral beton M.1018 m3 216,500
. Mortar siap pakai M.1019 Kg 11,000
. Pasir Beton (kg) M.1020 kg 250 SNI 02-6820-2002 (max 5mm,sisi tajam)
. Pasir Silika M.1021 Kg 6,100 Butiran Halus (1-6mm, sisi tajam)
. Semen grout M.1022 Kg 1,600
. Semen nat M.1023 Kg 9,000
. Sirtu M.1024 m3 239,000
. Tanah Liat M.1025 m3 135,200
. Tepung gypsum M.1026 kg 3,850
. KELOMPOK KAYU -
. List kayu 2/4 M.1027 m3 5,500,000
. Plepet kayu M.1029 m1 2,100
. Kayu cetakan M.1030 m2 150,000
. -
. Kelompok Kayu Reng -
. Reng 2 x 3 cm Kayu Kelas II M.1031 m3 3,200,000
. Reng bengkirai 2/3 M.1032 m1 4,500
. Reng bengkirai 3/4 M.1033 m1 9,000
. Reng jati (lokal) 2/3 M.1034 m1 5,940
. Reng jati (lokal) 3/4 M.1035 m1 11,880
. Reng jati 3/4 (klas 1) M.1036 m1 15,600
. Reng kamper 2/3 M.1037 m1 4,140
. Reng kamper 3/4 M.1038 m1 8,280
. Reng kruing 2/3 M.1039 m1 3,540
. Reng kruing 3/4 M.1040 m1 7,080
. -
. Kelompok Kayu Kaso -
. Kaso 5/7 Kelas II M.1041 m3 3,500,000
. Kaso 5/7 ( albasiah/meranti ) M.1042 m3 3,500,000
. Kaso-kaso (5 x 7) cm bengkirai M.1043 m3 6,250,000
. Kaso-kaso (5 x 7) cm jati lokal M.1044 m3 11,100,000
. Kaso-kaso (5 x 7) cm kamper M.1045 m3 6,225,000
. Kaso-kaso (5 x 7) cm kruing M.1046 m3 4,500,000
. Kayu Kaso 5 / 7 (borneo) M.1047 btg 49,000
. Kayu Kaso 5 / 7 (borneo/meranti) M.1048 m3 3,500,000
. Kayu kruing 5/7 M.1049 m3 4,500,000
. Usuk kayu bengkirai 5/7 M.1050 m1 22,750
. Usuk kayu jati (lokal) 5/7 M.1051 m1 33,250
. Usuk kayu jati 5/7 (klas 1) M.1052 m1 40,250
. Usuk kayu kamper 5/7 M.1053 m1 22,750
. Usuk kayu kruing 5/7 M.1054 m1 15,750
. Usuk Kayu meranti 5/7 Kelas III M.1055 m3 2,500,000
. -
. Kelompok Kayu Balok -
. Balok kayu 8/15 Kelas I M.1056 m3 7,500,000
. Balok kayu bengkirai M.1057 m3 6,250,000
. Balok Kayu Borneo M.1058 m3 3,500,000
. Balok kayu jati (klas plitur) M.1059 m3 11,100,000
. Balok kayu jati (lokal) M.1060 m3 9,100,000
. Balok kayu kamper M.1061 m3 6,225,000
. Balok kayu kelas II M.1062 m3 3,500,000
. Balok kayu kruing M.1063 m3 4,500,000
. Balok kayu papan (klas plitur) M.1064 m3 6,500,000
. Balok kayu, 6 x 12 M.1065 m3 4,500,000
. Kayu balok 5/7 Kelas II M.1066 m3 2,300,000
. Kayu balok 5/7 kelas III M.1067 m3 2,100,000
. Kayu balok borneo M.1068 M3 3,500,000

Software RAB Exarch xPro 9/396


. Kayu bengkirai balok M.1069 m3 6,250,000
. Kayu glugu balok M.1070 m3 1,600,000
. Kayu jati (klas plitur) balok M.1071 m3 9,500,000
. Kayu jati (lokal) balok M.1072 m3 7,500,000
. Kayu kamper balok M.1073 m3 6,225,000
. Kayu kelas II balok M.1074 M3 3,000,000
. Kayu kruing balok M.1075 m3 4,500,000
. -
. Kelompok Kayu Papan -
. Kayu bengkirai papan M.1076 m3 6,250,000
. Kayu jati (lokal) papan M.1077 m3 9,500,000
. Kayu jati papan M.1078 m3 9,500,000
. Kayu jati papan (klas 1) M.1079 m3 11,100,000
. Kayu kamper papan M.1080 m3 6,225,000
. Kayu kelas III (papan) M.1081 m3 2,500,000
. Kayu kruing papan M.1082 m3 4,500,000
. Kayu Papan 3 / 20 borneo/meranti M.1083 m3 3,500,000
. Kayu papan 3/20 M.1084 m3 3,500,000
. Kayu Papan kelas I M.1085 M3 6,225,000
. Kayu Papan kelas II M.1086 m3 3,500,000
. Kayu papan kelas III M.1087 m3 2,500,000
. Papan cetakan M.1088 m3 1,600,000
. Papan kayu 3/20 Kelas II M.1089 m3 3,250,000
. Papan kayu 3/20 Kelas III M.1090 m3 1,800,000
. Papan kayu bengkirai M.1091 m3 6,250,000
. Papan Kayu Borneo tebal 3cm M.1092 m3 3,500,000
. Papan kayu jati (klas plitur) M.1093 m3 9,500,000
. Papan kayu jati (lokal) M.1094 m3 9,500,000
. Papan kayu kamper M.1095 m3 6,225,000
. Papan kayu kelas II M.1096 m3 3,500,000
. Papan kayu kruing M.1097 m3 4,500,000
. -
. Kelompok Kayu Ram -
. Ram kayu bengkirai M.1098 m3 5,250,000
. Ram kayu jati (lokal) M.1099 m3 7,500,000
. Ram kayu kamper M.1100 m3 5,225,000
. Ram kayu kruing M.1101 m3 3,500,000
. -
. KELOMPOK BESI DAN ALUMINIUM -
. Alluminium B M.1102 Kg 24,000
. Alluminium C M.1103 Kg 25,600
. Aluminium Composite Panel M.1104 Lbr 303,000
. Aluminium foil M.1105 M2 29,900
. Aluminium strip M.1106 m 25,600
. Alumunium gel tbl 0,55 M.1107 Lbr 145,000
. Baja Siku M.1108 Kg 15,800
. Baja WF M.1109 Kg 17,800
. Besi angkur Ø=8 mm M.1110 Kg 11,000
. Besi hollow 50.50.3 M.1111 Kg 16,700
. Besi IWF M.1112 Kg 7,800
. Besi lis kaca (1 x 1) cm M.1113 m 45,000
. Besi plat baja M.1114 Kg 10,200
. Besi Profil M.1115 Kg 15,600
. Besi rangka M.1116 kg 1,600
. Besi siku L 30.30.3 M.1117 Kg 13,400
. Besi square tube M.1118 m 26,500
. Kait angin M.1119 Bh 5,500
. Kawat burung M.1120 m2 15,500
. Kawat dia 4 mm M.1121 kg 34,500
. Kawat duri M.1122 M’ 55,000
. Kawat harmonika M.1123 m2 42,000
. Kawat jaring M.1124 Lbr 110,000
. Kawat kassa M.1125 m2 12,000

Software RAB Exarch xPro 10/396


. Kawat las gas M.1127 Kg 45,000
. Kawat nyamuk M.1128 m2 12,000
. Kawat penggantung M.1129 m1 500
. Pagar kawat jaring M.1130 lbr 35,000
. Paku anti karat M.1131 kg 20,500
. Paku eternit M.1132 kg 19,500
. Paku gypsum M.1133 kg 17,500
. Paku Hak Panjang 15cm M.1134 Kg 11,000
. Paku Pancing 60 x 230 M.1135 Kg 12,000
. Paku plepet M.1136 kg 16,500
. Paku reng M.1137 kg 16,500
. Paku sekrup 3,5" M.1138 Kg 12,000 Tapping FAB SS 304- 90 mm , d4mm
. Paku skrup 1 cm – 2,5 cm M.1139 bh 500
. Paku skrup 10 cm M.1140 kg 14,000
. Paku skrup 5 cm M.1141 kg 17,000
. Paku sumbat M.1142 bh 400
. Paku tripleks M.1143 kg 18,000
. Paku usuk M.1144 kg 16,000
. Paku/skrup atap anti karat M.1145 bh 1,000
. Pintu alluminium M.1146 m 450,000
. Pintu alumunium M.1147 m2 211,800
. Pintu gulung besi M.1148 m2 550,000
. Profil Alluminium "T" M.1149 m 12,200
. Profil kusen alluminium M.1150 m1 120,000
. Rel pintu dorong M.1151 Set 200,000
. Rolling door alluminium M.1152 m2 520,000
. Screening M.1153 Kg 2,500
. Sekrup fixer M.1154 bh 250
. Sunscreen alumunium M.1155 m2 250,000
. -
. KELOMPOK PIPA, SANITASI DAN ACCESORIS -
. Bak cuci piring M.1156 Unit 430,000
. Bak fiberglass M.1157 Unit 320,000
. Bak mandi teraso M.1158 bh 186,000
. Bathcuip M.1159 Unit 2,750,000
. Klem Pipa M.1160 bh 1,500
. L.Bow M.1161 bh 10,000
. Pipa Beton M.1162 Bh 55,000
. Pipa Conduit M.1163 M' 5,200
. Pipa tanah M.1164 Bh 46,500
. Socket Pipa M.1165 bh 14,000
. Urinoir M.1166 Unit 1,400,000
. Waterdrain M.1167 Bh 76,000
. Pipa PVC 11/2” M.1168 M 6,500 WAVIN PVC AW -1 1/2"
. Pipa PVC 21/2” M.1169 M 7,500 WAVIN PVC AW -2 1/2"
. Pipa galvanis ½” M.1170 M 21,000
. Pipa galvanis 3/4” M.1171 M 26,000
. Pipa galvanis 1” M.1172 M 40,000
. Pipa galvanis 11/2” M.1173 M 76,000
. Pipa galvanis 3” M.1174 M 100,000
. Pipa galvanis 4” M.1175 M 134,000
. Pipa Baja Ø 63 mm M.1176 m 208,333
. Pipa Baja Ø 100 mm M.1177 m 375,000
. Pipa Baja Ø 125 mm M.1178 m 208,333
. Pipa Baja Ø 150 mm M.1179 m 124,000
. Pipa Baja Ø 200 mm M.1180 m 214,000
. Pipa Baja Ø 250 mm M.1181 m 262,000
. Pipa Baja Ø 300 mm M.1182 m 315,000
. Pipa Baja Ø 400 mm M.1183 m 420,000
. Pipa Baja Ø 450 mm M.1184 m 472,000
. Pipa Baja Ø 500 mm M.1185 m 525,000
. Pipa Baja Ø 600 mm M.1186 m 635,000
. Pipa Baja Ø 800 mm M.1187 m 840,000

Software RAB Exarch xPro 11/396


. Pipa Baja Ø 900 mm M.1188 m 945,000
. Pipa Baja Ø 1000 mm M.1189 m 1,200,000
. Pipa Baja Ø 1100 mm M.1190 m 1,250,000
. Pipa Baja Ø 1200 mm M.1191 m 1,300,000
. Pipa DCI Ø 100 mm M.1192 m 137,000
. Pipa DCI Ø 125 mm M.1193 m 200,000
. Pipa DCI Ø 150 mm M.1194 m 309,000
. Pipa DCI Ø 200 mm M.1195 M 550,000
. Pipa DCI Ø 250 mm M.1196 M 774,000
. Pipa DCI Ø 300 mm M.1197 m 1,050,000
. Pipa DCI Ø 400 mm M.1198 m 2,400,000
. Pipa DCI Ø 450 mm M.1199 m 2,800,000
. Pipa DCI Ø 500 mm M.1200 m 3,200,000
. Pipa DCI Ø 600 mm M.1201 m 3,600,000
. Pipa DCI Ø 800 mm M.1202 m 4,800,000
. Pipa DCI Ø 900 mm M.1203 m 5,100,000
. Pipa DCI Ø 1000 mm M.1204 m 6,000,000
. Pipa DCI Ø 1100 mm M.1205 m 6,500,000
. Pipa DCI Ø 1200 mm M.1206 m 7,300,000
. Pipa GIP Ø 63 mm M.1207 m 150,000
. Pipa GIP Ø 100 mm M.1208 m 219,000
. Pipa GIP Ø 125 mm M.1209 m 275,625
. Pipa GIP Ø 150 mm M.1210 m 330,750
. Pipa GIP Ø 200 mm M.1211 m 441,000
. Pipa GIP Ø 250 mm M.1212 m 551,250
. Pipa GIP Ø 300 mm M.1213 m 661,500
. Pipa GIP Ø 400 mm M.1214 m 882,000
. Pipa GIP Ø 450 mm M.1215 m 992,250
. Pipa GIP Ø 500 mm M.1216 m 1,102,500
. Pipa GIP Ø 600 mm M.1217 m 1,323,000
. Pipa GIP Ø 800 mm M.1218 m 1,764,000
. Pipa GIP Ø 900 mm M.1219 m 1,984,500
. Pipa GIP Ø 1000 mm M.1220 m 2,205,000
. Pipa GIP Ø 1100 mm M.1221 m 2,425,500
. Pipa GIP Ø 1200 mm M.1222 m 2,646,000
. Pipa HDPE Ø 63 mm M.1223 m 55,000
. Pipa HDPE Ø 100 mm M.1224 m 124,000
. Pipa HDPE Ø 125 mm M.1225 m 238,000
. Pipa HDPE Ø 150 mm M.1226 m 296,000
. Pipa HDPE Ø 200 mm M.1227 m 607,000
. Pipa HDPE Ø 250 mm M.1228 m 946,000
. Pipa HDPE Ø 300 mm M.1229 m 1,520,000
. Pipa HDPE Ø 400 mm M.1230 m 2,418,000
. Pipa HDPE Ø 450 mm M.1231 m 3,063,000
. Pipa HDPE Ø 500 mm M.1232 m 3,700,000
. Pipa HDPE Ø 600 mm M.1233 bh 6,000,000
. Pipa HDPE Ø 800 mm M.1234 m 8,700,000
. Pipa HDPE Ø 900 mm M.1235 m 9,800,000
. Pipa HDPE Ø 1000 M.1236 bh 10,500,000
. Pipa HDPE Ø 1000 mm M.1237 m 11,500,000
. Pipa HDPE Ø 1100 M.1238 bh 10,500,000
. Pipa HDPE Ø 1100 mm M.1239 m 11,500,000
. Pipa HDPE Ø 1200 mm M.1240 m 12,500,000
. Pipa Ø 80 mm M.1241 bh 58,000
. Pipa Ø 100 mm M.1242 bh 89,000
. Pipa Ø 150 mm M.1243 bh 95,000
. Pipa Ø 200 mm M.1244 bh 178,000
. Pipa Ø 250 mm M.1245 bh 220,000
. Pipa Ø 300 mm M.1246 bh 268,000
. Pipa Ø 400 mm M.1247 bh 357,000
. Pipa Ø 450 mm M.1248 bh 441,000
. Pipa Ø 500 mm M.1249 bh 472,000
. Pipa Ø 600 mm M.1250 bh 588,000

Software RAB Exarch xPro 12/396


. Pipa Ø 700 mm M.1251 bh 714,000
. Pipa Ø 800 mm M.1252 bh 787,000
. Pipa PVC Ø 63 mm M.1253 m 83,000
. Pipa PVC Ø 90 mm M.1254 m 102,000
. Pipa PVC Ø 110 mm M.1255 m 132,000
. Pipa PVC Ø 150 mm M.1256 m 165,000
. Pipa PVC Ø 200 mm M.1257 m 325,000
. Pipa PVC Ø 250 mm M.1258 m 472,000
. Pipa PVC Ø 300 mm M.1259 m 735,000
. Pipa PVC Ø 400 mm M.1260 m 1,352,000
. Pipa PVC Ø 450 mm M.1261 m 1,600,000
. Pipa PVC Ø 500 mm M.1262 m 2,300,000
. Pipa PVC Ø 600 mm M.1263 m 3,600,000
. Pipa PVC Ø 800 mm M.1264 m 4,900,000
. Pipa PVC Ø 900 mm M.1265 m 6,200,000
. Pipa PVC Ø 1000 mm M.1266 m 7,500,000
. Pipa PVC Ø 1100 mm M.1267 m 8,800,000
. Pipa PVC Ø 1200 mm M.1268 m 10,100,000
. Tee Ø 150 mm M.1269 bh 150,000
. Tee Ø 200 mm M.1270 bh 200,000
. Tee Ø 250 mm M.1271 bh 250,000
. Tee Ø 300 mm M.1272 bh 300,000
. Tee Ø 400 mm M.1273 bh 400,000
. Tee Ø 450 mm M.1274 bh 450,000
. Tee Ø 500 mm M.1275 bh 500,000
. Tee Ø 600 mm M.1276 bh 600,000
. Tee Ø 700 mm M.1277 bh 700,000
. Tee Ø 800 mm M.1278 bh 800,000
. Tee Ø 900 mm M.1279 bh 900,000
. Tee Ø 1000 mm M.1280 bh 1,050,000
. Tee Ø 1100 mm M.1281 bh 1,150,000
. Tee Ø 1200 mm M.1282 bh 1,200,000
. Valve Ø 150 mm M.1283 bh 5,600,000
. Valve Ø 200 mm M.1284 bh 6,700,000
. Valve Ø 250 mm M.1285 bh 9,500,000
. Valve Ø 300 mm M.1286 bh 3,000,000
. Valve Ø 400 mm M.1287 bh 4,000,000
. Valve Ø 450 mm M.1288 bh 4,500,000
. Valve Ø 500 mm M.1289 bh 5,000,000
. Valve Ø 600 mm M.1290 bh 6,000,000
. Valve Ø 700 mm M.1291 bh 7,000,000
. Valve Ø 800 mm M.1292 bh 8,000,000
. Valve Ø 900 mm M.1293 bh 9,000,000
. Valve Ø 1000 mm M.1294 bh 11,000,000
. Valve Ø 1100 mm M.1295 bh 11,500,000
. Valve Ø 1200 mm M.1296 bh 13,000,000
. -
. BAHAN PELAPIS DAN LEMBARAN -
. Akustik Uk. 60 cm x 120 cm M.1297 Lbr 128,000
. Akustik ukuran 30 x 30 cm M.1298 Lbr 35,000
. Akustik ukuran 30 x 60 cm M.1299 Lbr 55,000
. Asbes semen M.1300 m2 80,000
. Asbes 1,00 x 1,00 m M.1301 lbr 24,000
. Asbes Gelombang M.1302 lbr 110,000
. Asbes gelombang 92x250 M.1303 Lbr 107,000
. Asbes plat M.1304 m2 34,000
. Asbes semen tebal 4 mm M.1305 m2 19,500
. Asbes semen tebal 5 mm M.1306 m2 22,500
. Asbes semen tebal 6 mm M.1307 m2 25,000
. Bilik bambu M.1308 m2 75,000
. Formika M.1309 Lbr 90,000
. Gymfloor M.1310 m2 137,000
. Kalsiboard 3.5 mm M.1311 lbr 67,000

Software RAB Exarch xPro 13/396


. Karpet M.1312 m2 570,000
. List profil cornees gypsum M.1313 m1 27,000
. Multiplek M.1314 lbr 85,000
. Parquet kayu M.1315 m2 14,000
. Parquet kayu gymfloor M.1316 m2 290,000
. Phel film 12mm M.1317 Lbr 145,000
. Plafond PVC M.1318 m2 109,000
. Plastic aerator M.1319 Bh 35,000
. Polycarbonat M.1320 m2 145,500
. Seng Gelombang BJLS 32 M.1321 lbr 115,000
. Teakwood 4 mm 90 x 220 cm M.1322 Lbr 58,000
. Teakwood 4 mm, 120 x 240 M.1323 Lbr 70,000
. underlayer (pelapis bawah karpet) M.1324 m2 28,500
. Wallpaper M.1325 m 35,000
. -
. BAHAN CAT DAN LABURAN -
. Cat alkali resisting primer M.1326 kg 32,000
. Cat antara M.1327 Kg 45,000
. Cat Lapisan Dasar M.1328 kg 28,000
. Cat dasar Besi M.1329 Kg 31,000
. Cat Tembok Dasar M.1331 kg 65,000
. Cat duco M.1332 kg 65,000
. Cat emco M.1333 kg 42,000
. Cat ICI Weathershield M.1334 kg 60,000
. Cat Penutup Tembok M.1336 Kg 35,000
. Dempul M.1337 Kg 38,800
. Flincoat M.1338 kg 37,000
. Meni ( Read Lead ) A M.1340 Kg 34,000
. Meni ( Read Lead ) B M.1341 Kg 36,000
. Meni besi M.1342 Ltr 30,000
. Menie A M.1343 Kg 34,000
. Menie B M.1344 Kg 36,000
. Menie besi M.1345 Kg 27,000
. Minyak cat M.1346 kg 35,000
. Pengencer M.1347 Kg 35,000
. Politur M.1348 L 35,000
. Teak oil M.1349 L 16,500
. Vernis M.1350 L 115,000
. Vinyl M.1351 Bh 18,700
. -
. BAHAN KERAMIK -
. Hospital plint M.1352 bh 12,000
. keramik artistik 10cm x 10cm atau 5cm M.1353 Bh 2,500
. keramik artistik 10cm x 20cm M.1354 m2 75,000
. keramik Dinding 10cm x 20cm M.1355 m2 85,000
. keramik Dinding 20cm x 20cm M.1356 m2 62,500
. Keramik Dinding artistik M.1357 m2 66,000
. Keramik mozaik ukuran 30cm x 30cm M.1358 Bh 12,000
. Keramik ukuran 20cm x 20cm M.1359 Bh 4,500
. keramik ukuran 30cm x 30cm M.1360 Bh 6,000
. keramik ukuran 33cm x 33cm M.1361 Bh 7,500
. List keramik dinding motif M.1362 bh 12,000
. Marmer M.1363 m2 450,000
. marmer ukuran 100cm x 100cm M.1364 Bh 58,000
. Mosaik M.1365 m2 210,000
. Plint internal cove artistik 5cm x 5cm x M.1366 Bh 4,500
. Plint keramik artistik M.1367 bh 11,000
. Plint keramik ukuran 10cm x 10cm M.1368 Bh 5,600
. Plint keramik ukuran 10cm x 20cm M.1369 Bh 6,500
. Plint keramik ukuran 5cm x 20cm M.1370 Bh 4,500
. Plint Ubin M.1371 bh 3,500
. Plint ubin granit M.1372 bh 12,000
. Plint ubin granit ukuran 10cm x 30cm M.1373 Bh 13,000

Software RAB Exarch xPro 14/396


. Plint ubin granit ukuran 10cm x 40cm M.1374 Bh 14,000
. Plint ubin keramik 10 x 30 cm M.1375 bh 4,600
. Plint ubin keramik 10 x 40 cm M.1376 bh 6,000
. Plint ubin Pc abu-abu ukuran 10cm x 30 M.1377 Bh 5,000
. Plint ubin Pc abu-abu ukuran 10cm x 40 M.1378 Bh 6,000
. Plint ubin Pc abu-abu ukuran 15cm x 20 M.1379 Bh 6,500
. Plint ubin PC warna M.1380 bh 5,500
. Plint ubin teralux kerang M.1381 bh 6,000
. Plint ubin teralux kerang ukuran 10cm x M.1382 Bh 6,400
. Plint ubin teralux kerang ukuran 10cm x M.1383 Bh 7,000
. Plint ubin teralux marmer M.1384 bh 13,000
. Plint ubin teralux marmer ukuran 10cm M.1385 Bh 14,000
. Plint ubin teralux marmer ukuran 10cm M.1386 Bh 15,000
. plint ubin teralux marmer ukuran 10cm x M.1387 Bh 17,000
. Plint ubin teraso M.1388 bh 4,600
. Plint ubin teraso ukuran 10cm x 30cm M.1389 Bh 5,000
. Plint ubin teraso ukuran 10cm x 40cm M.1390 Bh 7,000
. Plint ubin warna ukuran 10cm x 20cm M.1391 Bh 4,500
. Plint ubin warna ukuran 10cm x 30cm M.1392 Bh 5,000
. Plint ubin warna ukuran 10cm x 40cm M.1393 Bh 6,500
. plint vynil 15cm x 30cm M.1394 Bh 25,000
. Porselen M.1395 m2 135,000
. Porselen (11 x 11) cm M.1396 Bh 6,500
. Porselen Dinding 10x20 M.1397 Bh 5,000
. Porselen Dinding 20x20 M.1398 Bh 7,000
. Print outdoor flexi M.1399 m2 54,000
. Stepnosing granito M.1400 bh 10,500
. Ubin abu-abu M.1401 m2 35,000
. Ubin granit M.1402 m2 285,000
. ubin granit ukuran 30cm x30cm M.1403 Bh 16,000
. ubin granit ukuran 40cm x40cm M.1404 Bh 20,000
. Ubin keramik M.1405 Bh 15,000
. Ubin keramik artistik M.1406 m2 56,000
. ubin PC abu-abu ukuran 20cm x20 cm M.1407 Bh 3,000
. ubin PC abu-abu ukuran 30cm x30 cm M.1408 Bh 4,500
. ubin PC abu-abu ukuran 40cm x40cm M.1409 Bh 6,000
. Ubin porselen M.1410 Bh 6,500
. ubin teralux marmer ukuran 40cm x40c M.1411 Bh 12,000
. ubin teralux ukuran 30cm x30cm M.1412 Bh 14,000
. Ubin teralux kerang M.1413 m2 78,000
. Ubin teralux marmer M.1414 m2 289,000
. ubin teralux marmer ukuran 30cm x30cm M.1415 Bh 34,000
. ubin teralux marmer ukuran 40cm x40cm M.1416 Bh 36,000
. ubin teralux marmer ukuran 60cm x60cm M.1417 Bh 45,000
. Ubin teraso M.1418 m2 145,000
. ubin teraso ukuran 30cm x30cm M.1419 Bh 13,500
. ubin teraso ukuran 40cm x40cm M.1420 Bh 15,500
. Ubin warna M.1421 m2 110,000
. ubin warna ukuran 20cm x20cm M.1422 Bh 11,500
. ubin warna ukuran 30cm x30cm M.1423 Bh 12,500
. ubin warna ukuran 40cm x40 cm M.1424 Bh 14,500
. -
. BAHAN ATAP DAN ACCESORIS ATAP -
. Atap Alluminium Gelombang tebal 0.55 M.1425 m2 165,000
. Atap metal gelombang t 0.35 mm M.1426 m2 61,750
. Bubung stel gel. M.1427 Lbr 16,000
. Bubungan gent.krmk KIA natural M.1428 bh 27,500
. Bubungan genteng beton warna M.1429 bh 22,000
. Bubungan genteng paris M.1430 bh 21,000
. Genteng aspal M.1431 Bh 2,800
. Genteng beton M.1432 Bh 2,700
. Genteng beton natural M.1433 bh 2,750
. Genteng beton Warna M.1434 bh 3,000

Software RAB Exarch xPro 15/396


. Genteng bubung M.1435 Bh 5,000
. Genteng Bubung Kodok M.1436 bh 1,500
. Genteng Bubung Palentong M.1437 bh 2,000
. Genteng keramik KIA natural M.1438 bh 6,500
. Genteng kodok M.1439 Bh 1,500
. Genteng metal M.1440 Bh 35,000
. Genteng palentong M.1441 Bh 2,500
. Genteng Palentong Super M.1442 bh 3,500
. Genteng paris M.1443 bh 800
. Genteng Sirap M.1444 lbr 4,000
. nok genteng aspal M.1445 Bh 25,000
. nok genteng beton M.1446 Bh 15,000
. Nok Genteng Decra Bond M.1447 lbr 71,000
. Nok metal M.1448 bh 74,000
. Nok Paten M.1449 Lbr 41,500
. Nok standar 40 cm 18, swg 22 M.1450 m2 81,000
. Nok standar 40x18 M.1451 Bh 5,832
. Nok Stel Gelombang M.1452 lbr 74,000
. Nok Stel rata M.1453 lbr 55,000
. Roof Light Fiberglass M.1454 lbr 138,000
. Rooflight 90x180 M.1455 Lbr 120,000
. Sirap kayu M.1456 Bh 2,500
. -
. BAHAN LISTRIK & ACCESORIS -
. Klem Pipa Listrik M.1457 bh 750
. Las Dop M.1458 bh 1,000
. Mongkok (Listrik) M.1459 bh 1,500
. Saklar (standar) M.1460 bh 35,000
. Tee Doos M.1461 bh 1,500
. Pipa listrik 5/8” M.1462 btg 12,500
. -
. BAHAN KACA -
. Kaca buram 12 mm M.1463 m2 150,000
. Kaca cermin 5 mm M.1464 m2 150,500
. Kaca cermin 8 mm M.1465 m2 235,000
. Kaca patri 5mm M.1466 m2 85,000
. Kaca polos M.1467 m2 110,000
. Kaca tebal 3mm M.1468 m2 90,000
. Kaca tebal 5 mm M.1469 m2 120,000
. Kaca tebal 8 mm M.1470 m2 183,500
. Kaca wire glass M.1471 m2 235,000
. Profil kaca M.1472 m 65,000
. -
. BAHAN BETON DAN CETAKAN/CAMPURAN -
. Bahan teraso cor M.1473 m3 980,000
. Beton 1:2:3 M.1474 M3 1,200,000
. Beton kedap air M.1475 m3 298,000
. Conblock M.1476 m2 6,000
. Hollow Block 10 M.1477 bh 6,500
. Hollow Block 15 M.1478 bh 7,000
. Hollow Block 20 M.1479 bh 11,000
. Kasa gypsum M.1480 roll 448,000
. Kolom beton pracetak M.1481 btg 201,600
. Panel Beton Pracetak M.1482 Lbr 150,000
. Paving block 8 cm berwarna M.1483 M2 110,000
. Paving block 6cm berwarna M.1484 M2 130,000
. Paving block 8 cm natural M.1485 M2 3,500
. Roster 25/25 cm M.1486 bh 15,000
. Teraso cor di tempat, tebal 3cm M.1487 M3 4,500
. Terawang (roster) M.1488 bh 8,500
. -
. BAHAN HABIS PAKAI (COMSUMABLE) -
. -

Software RAB Exarch xPro 16/396


. Bahan Bakar M.1489 Ltr 10,000
. Bahan Kimia M.1490 Ltr 44,500
. Batu Gerinda M.1491 bh 75,000
. Lem M.1492 kg 15,000
. Lem kayu M.1493 Kg 13,000
. Lem Putih M.1494 Kg 15,000
. Lem vinyl M.1495 kg 20,000
. Minyak pelumas M.1496 Ltr 35,000
. Oli M.1497 Ltr 35,000
. Perekat M.1498 Kg 45,000
. Residu M.1499 Ltr 8,500
. Sabun M.1500 Kg 11,200
. Soda api M.1501 Kg 45,000
. Solar M.1502 L 8,500
. Gas Oxigen M.1503 Tbg 1,558,500 Isi tabung Oxigen 6 m3
. Gas Aceteline M.1504 Tbg 1,850,000 Isi tabung Acetylene 7 m3
. Kawat Solder (Timah) M.1505 kg 875,000 Kawat timah dalam roll, dia. 2 mm
. Kawat Brazing (Kuningan) M.1506 kg 950,000 Stick Kuningan diameter 3 mm
. -
. PINTU JENDELA DAN ACCESORIS -
. Door closer M.1507 set 250,000
. Door holder M.1508 Bh 97,000
. Door stop M.1509 Bh 98,000
. Engsel angin M.1510 Bh 8,000
. Engsel jendela M.1511 bh 9,000
. Engsel kupu-kupu M.1512 Bh 20,000
. Jendela besi M.1513 m2 825,000
. Jendela naco M.1514 Bh 24,500
. Kait angin Standar M.1515 Bh 6,500
. Kunci lemari M.1516 Set 12,000
. Kunci silinder M.1517 Bh 75,000
. Kunci slot M.1518 Bh 50,000
. Kunci tanam antik M.1519 Bh 250,000
. Kunci tanam biasa M.1520 Bh 130,000
. Kunci tanam KM M.1521 Bh 50,000
. Pintu lipat M.1522 m2 500,000
. -
. LAIN-LAIN -
. Badkip M.1523 bh 15,000
. Floor hardener M.1524 Kg 3,750
. Grassblock M.1525 m2 45,000
. Gebalan Rumput M.1526 m2 30,000
. Internal cove M.1527 bh 7,500
. Jaring kawat baja dilas M.1528 kg 12,000
. Kalkarium M.1529 Kg 5,250
. Kerta karbon M.1530 lbr 3,800
. Kertas 100 x 100 cm M.1531 lb 5,600
. Lantai kerja tebal 10cm M.1532 m3 750,000
. Pengelasan M.1533 cm 4,500
. Prodo M.1534 m2 3,000,000
. Sealant M.1535 Tube 218,000
. Spring knip M.1536 Bh 7,500
. Strorox - 100 M.1537 kg 42,500
. Tali ijuk M.1538 Kg 23,400
. Underlayer irubber corrugated M.1539 m2 93,500
. Venetions blinds dan vertical blinds (tirai M.1540 m2 75,000
. Waterstop lebar 150 mm M.1541 m 78,000
. Waterstop lebar 200 mm M.1542 m 80,000
. Waterstop lebar 230 mm - 320 mm M.1543 m 95,000
-

Software RAB Exarch xPro 17/396


STANDAR ID Koef. Unit Uraian Harga OH Kode Item
DAFTAR ANALISA UMUM
Analisa Satuan Pekerjaan yang Umum digunakan
xxx U-000 1.00 Ls Analisa Default - - .
0.00 OH Pekerja - L.1
0.00 OH Mandor - L.10
PEKERJAAN PERSIAPAN
A.2.2.1.9. U-001 1.00 m2 Pembersihan lapangan dan perataan 17,750 0.2 .
0.10 OH Pekerja 8,500 L.1
0.05 OH Mandor 9,250 L.10
A.2.2.1.4. U-002 1.00 m1 Pengukuran dan pemasangan Bouwplank 90,125 0.2 .
0.10 OH Pekerja 8,500 L.1
0.10 OH Tukang Kayu 10,000 L.6
0.01 OH Kepala Tukang 1,500 L.9
0.01 OH Mandor 925 L.10
0.01 m3 Balok Kayu 4x6-K.II 37,200 M.98
0.02 Kg Paku Biasa 2" - 5" 500 M.111
0.01 m3 Papan Kayu 2x20-K.II 31,500 M.106
A.2.2.1.7. a U-003 1.00 Unit Pembuatan Gudang Bahan Ukuran 3 m x3m tinggi 2.4 m 8,092,696 9.0 .
1.00 OH Mandor 185,000 L.10
5.00 OH Pekerja 425,000 L.1
1.00 OH Kepala Tukang 150,000 L.9
2.00 OH Tukang Kayu 200,000 L.6
0.32 m3 Balok Kayu 5x10-K.II 1,108,800 M.100
0.04 m3 Balok Kayu 4x6-K.II 109,048 M.98
0.10 m3 Balok Kayu 3x4-K.II 266,112 M.96
0.03 m3 Balok Kayu 2x3-K.II 69,724 M.94
0.20 m3 Papan Kayu 2x20-K.II 891,000 M.106
31.68 Lbr Tripleks 2,692,800 M.62
19.72 Lbr Seng Gelombang 3" x 6" BJLS 28 1,380,192 M.61
69.99 bh Screw 34,993 M.113
1.94 kg Paku Biasa ½" - 1" 45,703 M.110
7.29 kg Paku Biasa 2" - 5" 182,325 M.111
0.09 m3 Pasir Urug 18,000 M.10
0.15 m3 Kerikil 33,000 M.7
3.00 bh Engsel Pintu 51,000 M.125
1.00 Ls Perlengkapan Umum 250,000 A.4
A.2.2.1.5.a U-004 1.00 Unit Pembuatan Kantor Sementara/Bedeng Pekerja/Direksi Keet 8,147,696 9.0 .
1.00 OH Mandor 185,000 L.10
5.00 OH Pekerja 425,000 L.1
1.00 OH Kepala Tukang 150,000 L.9
2.00 OH Tukang Kayu 200,000 L.6
0.32 m3 Balok Kayu 5x10-K.II 1,108,800 M.100
0.04 m3 Balok Kayu 4x6-K.II 109,048 M.98
0.10 m3 Balok Kayu 3x4-K.II 266,112 M.96
0.03 m3 Balok Kayu 2x3-K.II 69,724 M.94
0.20 m3 Papan Kayu 2x20-K.II 891,000 M.106
31.68 Lbr Tripleks 2,692,800 M.62
19.72 Lbr Seng Gelombang 3" x 6" BJLS 28 1,380,192 M.61
69.99 bh Screw 34,993 M.113
1.94 kg Paku Biasa ½" - 1" 45,703 M.110
7.29 kg Paku Biasa 2" - 5" 182,325 M.111
0.09 m3 Pasir Urug 18,000 M.10
0.15 m3 Kerikil 33,000 M.7
3.00 bh Engsel Pintu 51,000 M.125
1.00 m2 Jendela nako (rangka + kaca 5 mm) 55,000 M.136
1.00 Ls Perlengkapan Umum 250,000 A.4
A.2.2.1.6. U-005 1.00 unit Pos Jaga Bahan Kayu Ukuran 2x2x2-t 2.9m 3,522,798 9.0 .
1.00 OH Mandor 185,000 L.10
5.00 OH Pekerja 425,000 L.1
1.00 OH Kepala Tukang 150,000 L.9
2.00 OH Tukang Kayu 200,000 L.6

Software RAB Exarch xPro 18/396


0.16 m3 Balok Kayu 5x10-K.II 546,000 M.100
0.02 m3 Balok Kayu 4x6-K.II 55,154 M.98
0.04 m3 Balok Kayu 3x4-K.II 109,402 M.96
0.01 m3 Balok Kayu 2x3-K.II 13,155 M.94
0.13 m3 Papan Kayu 2x20-K.II 594,000 M.106
5.88 Lbr Tripleks 500,091 M.62
4.41 Lbr Seng Gelombang 3" x 6" BJLS 28 308,880 M.61
13.59 bh Screw 6,795 M.113
1.18 kg Paku Biasa ½" - 1" 27,652 M.110
4.71 kg Paku Biasa 2" - 5" 117,669 M.111
0.06 m3 Pasir Urug 12,000 M.10
0.10 m3 Kerikil 22,000 M.7
1.00 Ls Perlengkapan Umum 250,000 A.4
PEKERJAAN TANAH
A.2.3.1.1. U-006 1.00 m3 Penggalian tanah biasa sedalam 1 m 68,375 0.8 .
0.75 OH Pekerja 63,750 L.1
0.03 OH Mandor 4,625 L.10
A.2.3.1.2. U-007 1.00 m3 Penggalian tanah biasa sedalam 2 m 84,825 0.9 .
0.90 OH Pekerja 76,500 L.1
0.05 OH Mandor 8,325 L.10
A.2.3.1.11. U-008 1.00 m3 Pengurugan dengan pasir urug 267,350 0.3 .
0.30 OH Pekerja 25,500 L.1
0.01 OH Mandor 1,850 L.10
1.20 M3 Pasir urug 240,000 M.10
AK-SNI 2008 U-009 1.00 m3 Urug tanah mendatangkan 219,350 0.3 .
1.20 m3 Tanah urug 192,000 M.14
0.30 oh Pekerja 25,500 L.1
0.01 oh Mandor 1,850 L.10
A.2.3.1.10. U-010 1.00 m3 Pemadatan tanah tanah ( per 20 cm) 51,750 0.6 .
0.50 OH Pekerja 42,500 L.1
0.05 OH Mandor 9,250 L.10
PEKERJAAN PONDASI
A.3.2.1.9. U-011 1.00 m3 Pemasangan batu kosong (anstamping) 504,765 1.2 .
0.78 OH Pekerja 66,300 L.1
0.39 OH Tukang Batu 39,000 L.3
0.04 OH Kepala Tukang 5,850 L.9
0.04 OH Mandor 7,215 L.10
1.20 m3 Batu belah 300,000 M.5
0.43 m3 Pasir urug 86,400 M.10
A.3.2.1.1. U-012 1.00 m3 Pemasangan pondasi batu belah campuran 1SP : 3PP 913,900 2.4 .
1.50 OH Pekerja 127,500 L.1
0.75 OH Tukang Batu 75,000 L.3
0.08 OH Kepala Tukang 11,250 L.9
0.08 OH Mandor 13,875 L.10
1.20 m3 Batu belah 300,000 M.5
202.00 Kg Semen 262,600 M.12
0.49 m3 Pasir Pasang 123,675 M.9
A.3.2.1.3. U-013 1.00 m3 Pemasangan pondasi batu belah campuran 1SP : 5PP 843,145 2.4 .
1.50 OH Pekerja 127,500 L.1
0.75 OH Tukang Batu 75,000 L.3
0.08 OH Kepala Tukang 11,250 L.9
0.08 OH Mandor 13,875 L.10
1.20 m3 Batu belah 300,000 M.5
136.00 Kg Semen 176,800 M.12
0.54 m3 Pasir Pasang 138,720 M.9
SNI-2002 U-014 1.00 m1 Memasang rollag bata , campuran spesi 1 PC : 3 PP 32,901 0.1 .
17.00 bh Bata merah 11,050 M.2
4.94 kg Semen 6,425 M.12
0.01 m3 Pasir pasang 3,494 M.9
0.09 oh Pekerja 7,650 L.1
0.03 oh Tukang batu 3,000 L.3
0.00 oh Kepala tukang 450 L.9

Software RAB Exarch xPro 19/396


0.00 oh Mandor 833 L.10
PEKERJAAN PASANGAN DINDING
A.4.4.1.8 U-015 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal ½ ba 114,156 0.4 .
0.30 OH Pekerja 25,500 L.1
0.10 OH Tukang Batu 10,000 L.3
0.01 OH Kepala Tukang 1,500 L.9
0.02 OH Mandor 2,775 L.10
70.00 bh Bata merah 45,500 M.2
14.37 Kg Semen 18,681 M.12
0.04 m3 Pasir Pasang 10,200 M.9
A.4.4.1.10 U-016 1.00 m2 Pemasangan dinding bata merah (5x11x22)cm tebal ½ ba 109,334 0.4 .
0.30 OH Pekerja 25,500 L.1
0.10 OH Tukang Batu 10,000 L.3
0.01 OH Kepala Tukang 1,500 L.9
0.02 OH Mandor 2,775 L.10
70.00 bh Bata merah 45,500 M.2
9.68 Kg Semen 12,584 M.12
0.05 m3 Pasir Pasang 11,475 M.9
SNI-2002 U-017 1.00 m2 Pasangan dinding batako 133,200 0.6 .
12.50 bh Batako 48,125 M.3
12.50 kg Semen 16,250 M.12
0.04 m3 Pasir pasang 10,200 M.9
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala Tukang 1,500 L.9
0.50 oh Pekerja 42,500 L.1
0.03 oh Mandor 4,625 L.10
A.4.4.2.3. U-018 1.00 m2 Pemasangan plesteran 1SP : 3PP tebal 15mm. 61,499 0.5 .
0.30 OH Pekerja 25,500 L.1
0.15 OH Tukang Batu 15,000 L.3
0.02 OH Kepala Tukang 2,250 L.9
0.02 OH Mandor 2,775 L.10
7.78 Kg Semen 10,109 M.12
0.02 m3 Pasir Pasang 5,865 M.9
A.4.4.2.5. U-019 1.00 m2 Pemasangan plesteran 1SP : 5PP tebal 15 mm 58,894 0.5 .
0.30 OH Pekerja 25,500 L.1
0.15 OH Tukang Batu 15,000 L.3
0.02 OH Kepala Tukang 2,250 L.9
0.02 OH Mandor 2,775 L.10
5.18 Kg Semen 6,739 M.12
0.03 m3 Pasir Pasang 6,630 M.9
A.4.4.2.27. U-020 1.00 m2 Pemasangan acian. 34,575 0.3 .
0.20 OH Pekerja 17,000 L.1
0.10 OH Tukang Batu 10,000 L.3
0.01 OH Kepala Tukang 1,500 L.9
0.01 OH Mandor 1,850 L.10
3.25 Kg Semen 4,225 M.12
PEKERJAAN BETON DAN STRUKTUR UTAMA
A.4.1.1.4 U-021 1.00 m3 Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), 771,927 1.5 .
1.20 OH Pekerja 102,000 L.1
0.20 OH Tukang Batu 20,000 L.3
0.02 OH Kepala Tukang 3,000 L.9
0.06 OH Mandor 11,100 L.10
230.00 kg Semen 299,000 M.12
0.64 m3 Pasir Beton 159,464 M.8
0.76 m3 Kerikil 167,363 M.7
200.00 Ltr Air 10,000 M.1
A.4.1.1.1 U-022 1.00 m3 Membuat beton mutu f’c = 7,4 MPa (K 100) 837,134 2.0 .
1.65 OH Pekerja 140,250 L.1
0.28 OH Tukang Batu 27,500 L.3
0.03 OH Kepala Tukang 4,200 L.9
0.08 OH Mandor 15,355 L.10
247.00 kg Semen 321,100 M.12

Software RAB Exarch xPro 20/396


0.62 m3 Pasir Beton 155,179 M.8
0.74 m3 Kerikil 162,800 M.7
215.00 Ltr Air 10,750 M.1
A.4.1.1.2 U-023 1.00 m3 Membuat beton mutu f’= 9,8 MPa (K 125) 869,631 2.0 .
1.65 OH Pekerja 140,250 L.1
0.28 OH Tukang Batu 27,500 L.3
0.03 OH Kepala Tukang 4,200 L.9
0.08 OH Mandor 15,355 L.10
276.00 kg Semen 358,800 M.12
0.59 m3 Pasir Beton 147,857 M.8
0.75 m3 Kerikil 164,919 M.7
215.00 Ltr Air 10,750 M.1
A.4.1.1.3 U-024 1.00 m3 Membuat beton mutu f’= 12,2 MPa (K 150) 895,167 2.0 .
1.65 OH Pekerja 140,250 L.1
0.28 OH Tukang Batu 27,500 L.3
0.03 OH Kepala Tukang 4,200 L.9
0.08 OH Mandor 15,355 L.10
299.00 kg Semen 388,700 M.12
0.57 m3 Pasir Beton 142,679 M.8
0.75 m3 Kerikil 165,733 M.7
215.00 Ltr Air 10,750 M.1
A.4.1.1.5. U-025 1.00 m3 Membuat beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2 925,258 2.0 .
1.65 OH Pekerja 140,250 L.1
0.28 OH Tukang Batu 27,500 L.3
0.03 OH Kepala Tukang 4,200 L.9
0.08 OH Mandor 15,355 L.10
326.00 kg Semen 423,800 M.12
0.54 m3 Pasir Beton 135,714 M.8
0.76 m3 Kerikil 167,689 M.7
215.00 Ltr Air 10,750 M.1
A.4.1.1.6 U-026 1.00 m3 Membuat beton mutu f’= 16,9 MPa (K 200), slump (120 ± 954,206 2.0 .
1.65 OH Pekerja 140,250 L.1
0.28 OH Tukang Batu 27,500 L.3
0.03 OH Kepala Tukang 4,200 L.9
0.08 OH Mandor 15,355 L.10
352.00 kg Semen 457,600 M.12
0.52 m3 Pasir Beton 130,536 M.8
0.76 m3 Kerikil 168,015 M.7
215.00 Ltr Air 10,750 M.1
A.4.1.1.7. U-027 1.00 m3 Membuat beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 975,620 2.0 .
1.65 OH Pekerja 140,250 L.1
0.28 OH Tukang Batu 27,500 L.3
0.03 OH Kepala Tukang 4,200 L.9
0.08 OH Mandor 15,355 L.10
371.00 kg Semen 482,300 M.12
0.50 m3 Pasir Beton 124,643 M.8
0.78 m3 Kerikil 170,622 M.7
215.00 Ltr Air 10,750 M.1
A.4.1.1.8. U-028 1.00 m3 Membuat beton mutu f’= 21,7 MPa (K 250), slump (120 ± 990,145 2.0 .
1.65 OH Pekerja 140,250 L.1
0.28 OH Tukang Batu 27,500 L.3
0.03 OH Kepala Tukang 4,200 L.9
0.08 OH Mandor 15,355 L.10
384.00 kg Semen 499,200 M.12
0.49 m3 Pasir Beton 123,571 M.8
0.77 m3 Kerikil 169,319 M.7
215.00 Ltr Air 10,750 M.1
A.4.1.1.9. U-029 1.00 m3 Membuat beton mutu f’ = 24,0 MPa (K 275), slump (120 ± 1,015,198 2.0 .
1.65 OH Pekerja 140,250 L.1
0.28 OH Tukang Batu 27,500 L.3
0.03 OH Kepala Tukang 4,200 L.9
0.08 OH Mandor 15,355 L.10

Software RAB Exarch xPro 21/396


406.00 kg Semen 527,800 M.12
0.49 m3 Pasir Beton 122,143 M.8
0.76 m3 Kerikil 167,200 M.7
215.00 Ltr Air 10,750 M.1
A.4.1.1.10. U-030 1.00 m3 Membuat beton mutu f’c = 26,4 MPa (K 300), slump (120 1,022,947 2.0 .
1.65 OH Pekerja 140,250 L.1
0.28 OH Tukang Batu 27,500 L.3
0.03 OH Kepala Tukang 4,200 L.9
0.08 OH Mandor 15,355 L.10
413.00 kg Semen 536,900 M.12
0.49 m3 Pasir Beton 121,607 M.8
0.76 m3 Kerikil 166,385 M.7
215.00 Ltr Air 10,750 M.1
A.4.1.1.11. U-031 1.00 m3 Membuat beton mutu f’c = 28,8 MPa (K 325), slump (120 1,103,209 2.6 .
2.10 OH Pekerja 178,500 L.1
0.35 OH Tukang Batu 35,000 L.3
0.04 OH Kepala Tukang 5,250 L.9
0.11 OH Mandor 19,425 L.10
439.00 kg Semen 570,700 M.12
0.48 m3 Pasir Beton 119,643 M.8
0.75 m3 Kerikil 163,941 M.7
215.00 Ltr Air 10,750 M.1
A.4.1.1.12. U-032 1.00 m3 Membuat beton mutu f’c = 31,2 MPa (K 350), slump (120 1,113,395 2.6 .
2.10 OH Pekerja 178,500 L.1
0.35 OH Tukang Batu 35,000 L.3
0.04 OH Kepala Tukang 5,250 L.9
0.11 OH Mandor 19,425 L.10
448.00 kg Semen 582,400 M.12
0.48 m3 Pasir Beton 119,107 M.8
0.74 m3 Kerikil 162,963 M.7
215.00 Ltr Air 10,750 M.1
A.4.1.1.17 U-033 1.00 kg Pembesian dengan besi polos atau besi ulir 12,327 0.0 .
0.01 OH Pekerja 595 L.1
0.01 OH Tukang Besi 700 L.4
0.00 OH Kepala Tukang 105 L.9
0.00 OH Mandor 74 L.10
1.05 kg Besi beton 10,500 M.16
0.02 kg Kawat beton 353 M.27
A.4.1.1.20 U-034 1.00 m2 (K3) Pemasangan bekisting untuk pondasi 182,985 0.8 .
0.52 OH Pekerja 44,200 L.1
0.26 OH Tukang Kayu 26,000 L.6
0.03 OH Kepala Tukang 3,900 L.9
0.03 OH Mandor 4,810 L.10
0.04 m3 Papan Kayu 2x20-K.III 92,000 M.107
0.30 kg Paku Biasa 2" - 5" 7,500 M.111
0.10 Ltr Minyak bekisting 4,575 M.141
A.4.1.1.21 U-035 1.00 m2 (K3) Pemasangan bekisting untuk sloof 194,485 0.8 .
0.52 OH Pekerja 44,200 L.1
0.26 OH Tukang Kayu 26,000 L.6
0.03 OH Kepala Tukang 3,900 L.9
0.03 OH Mandor 4,810 L.10
0.05 m3 Papan Kayu 2x20-K.III 103,500 M.107
0.30 kg Paku Biasa 2" - 5" 7,500 M.111
0.10 Ltr Minyak bekisting 4,575 M.141
A.4.1.1.22 U-036 1.00 m2 (K3) Pemasangan bekisting untuk kolom 369,055 1.1 .
0.66 OH Pekerja 56,100 L.1
0.33 OH Tukang Kayu 33,000 L.6
0.03 OH Kepala Tukang 4,950 L.9
0.03 OH Mandor 6,105 L.10
0.04 m3 Papan Kayu 2x20-K.III 92,000 M.107
0.40 kg Paku Biasa 2" - 5" 10,000 M.111
0.20 Ltr Minyak bekisting 9,150 M.141

Software RAB Exarch xPro 22/396


0.02 m3 Balok Kayu 4x6-K.II 46,500 M.98
0.35 Lbr Plywood 120x240 tbl. 9 mm 61,250 M.60
2.00 btg Dolken kayu Ø 8-10/400 cm 50,000 M.104
A.4.1.1.23 U-037 1.00 m2 (K3) Pemasangan bekisting untuk balok 378,355 1.1 .
0.66 OH Pekerja 56,100 L.1
0.33 OH Tukang Kayu 33,000 L.6
0.03 OH Kepala Tukang 4,950 L.9
0.03 OH Mandor 6,105 L.10
0.04 m3 Papan Kayu 2x20-K.III 92,000 M.107
0.40 kg Paku Biasa 2" - 5" 10,000 M.111
0.20 Ltr Minyak bekisting 9,150 M.141
0.02 m3 Balok Kayu 4x6-K.II 55,800 M.98
0.35 Lbr Plywood 120x240 tbl. 9 mm 61,250 M.60
2.00 btg Dolken kayu Ø 8-10/400 cm 50,000 M.104
A.4.1.1.24 U-038 1.00 m2 (K3) Pemasangan bekisting untuk lantai 469,055 1.1 .
0.66 OH Pekerja 56,100 L.1
0.33 OH Tukang Kayu 33,000 L.6
0.03 OH Kepala Tukang 4,950 L.9
0.03 OH Mandor 6,105 L.10
0.04 m3 Papan Kayu 2x20-K.III 92,000 M.107
0.40 kg Paku Biasa 2" - 5" 10,000 M.111
0.20 Ltr Minyak bekisting 9,150 M.141
0.02 m3 Balok Kayu 4x6-K.II 46,500 M.98
0.35 Lbr Plywood 120x240 tbl. 9 mm 61,250 M.60
6.00 btg Dolken kayu Ø 8-10/400 cm 150,000 M.104
A.4.1.1.25 U-039 1.00 m2 (K3) Pemasangan bekisting untuk dinding 404,555 1.1 .
0.66 OH Pekerja 56,100 L.1
0.33 OH Tukang Kayu 33,000 L.6
0.03 OH Kepala Tukang 4,950 L.9
0.03 OH Mandor 6,105 L.10
0.03 m3 Papan Kayu 2x20-K.III 69,000 M.107
0.40 kg Paku Biasa 2" - 5" 10,000 M.111
0.20 Ltr Minyak bekisting 9,150 M.141
0.02 m3 Balok Kayu 4x6-K.II 62,000 M.98
0.35 Lbr Plywood 120x240 tbl. 9 mm 61,250 M.60
3.00 btg Dolken kayu Ø 8-10/400 cm 75,000 M.104
4.00 bh Penjaga jarak bekisting / spacer 18,000 A.11
A.4.1.1.26 U-040 1.00 m2 (K3) Pemasangan bekisting untuk tangga 343,768 1.1 .
0.66 OH Pekerja 56,100 L.1
0.33 OH Tukang Kayu 33,000 L.6
0.03 OH Kepala Tukang 4,950 L.9
0.03 OH Mandor 6,105 L.10
0.03 m3 Papan Kayu 2x20-K.III 69,000 M.107
0.40 kg Paku Biasa 2" - 5" 10,000 M.111
0.15 Ltr Minyak bekisting 6,863 M.141
0.02 m3 Balok Kayu 4x6-K.II 46,500 M.98
0.35 Lbr Plywood 120x240 tbl. 9 mm 61,250 M.60
2.00 btg Dolken kayu Ø 8-10/400 cm 50,000 M.104
PEKERJAAN KERAMIK
A.4.4.3.33. U-041 1.00 m2 Pemasangan lantai keramik artistik 10cm x 10cm atau 5 234,097 1.1 .
0.70 OH Pekerja 59,500 L.1
0.35 OH Tukang Batu 35,000 L.3
0.04 OH Kepala tukang 5,250 L.9
0.04 OH Mandor 6,475 L.10
1.05 m2 Keramik Lantai 10x10 57,750 M.79
8.19 Kg Semen 10,647 M.12
0.05 M3 Pasir Pasang 11,475 M.9
3.20 Kg Semen Warna 48,000 M.13
A.4.4.3.36. U-042 1.00 m2 Pemasangan lantai keramik ukuran 20cm x 20cm 246,870 1.1 .
0.70 OH Pekerja 59,500 L.1
0.35 OH Tukang Batu 35,000 L.3
0.04 OH Kepala tukang 5,250 L.9

Software RAB Exarch xPro 23/396


0.04 OH Mandor 6,475 L.10
1.05 Bh Keramik Lantai 20x20 91,350 M.80
10.40 Kg Semen 13,520 M.12
0.05 M3 Pasir Pasang 11,475 M.9
1.62 Kg Semen Warna 24,300 M.13
A.4.4.3.35. U-043 1.00 m2 Pemasangan lantai keramik ukuran 30cm x 30cm 252,950 1.1 .
0.70 OH Pekerja 59,500 L.1
0.35 OH Tukang Batu 35,000 L.3
0.04 OH Kepala tukang 5,250 L.9
0.04 OH Mandor 6,475 L.10
1.05 Bh Keramik Lantai 30x30 99,750 M.81
10.00 Kg Semen 13,000 M.12
0.05 M3 Pasir Pasang 11,475 M.9
1.50 Kg Semen Warna 22,500 M.13
A.4.4.3.14. U-044 1.00 m2 Pemasangan lantai ubin teralux marmer ukuran 40cm x 192,070 0.4 .
0.25 OH Pekerja 21,250 L.1
0.13 OH Tukang Batu 12,500 L.3
0.01 OH Kepala tukang 1,950 L.9
0.01 OH Mandor 2,405 L.10
1.05 Bh Keramik Lantai 40x40 110,250 M.82
9.80 kg Semen 12,740 M.12
1.30 Kg Semen Warna 19,500 M.13
0.05 M3 Pasir Pasang 11,475 M.9
A.4.4.3.13. U-045 1.00 m2 Pemasangan lantai ubin teralux marmer ukuran 60cm x 292,875 0.4 .
0.24 OH Pekerja 20,400 L.1
0.12 OH Tukang Batu 12,000 L.3
0.01 OH Kepala tukang 1,800 L.9
0.01 OH Mandor 2,220 L.10
1.05 Bh Keramik Lantai 60x60 210,000 M.83
9.60 kg Semen 12,480 M.12
1.50 Kg Semen Warna 22,500 M.13
0.05 M3 Pasir Pasang 11,475 M.9
A.4.4.3.43. U-046 1.00 m2 Pemasangan lantai marmer ukuran 100cm x 100cm 199,577 1.1 .
0.70 OH Pekerja 59,500 L.1
0.35 OH Tukang Batu 35,000 L.3
0.04 OH Kepala tukang 5,250 L.9
0.04 OH Mandor 6,475 L.10
1.06 m2 marmer ukuran 100cm x 100cm 61,480 M.1364
8.19 Kg Semen 10,647 M.12
0.05 M3 Pasir Pasang 11,475 M.9
0.65 Kg Semen Warna 9,750 M.13
A.4.4.3.54. U-047 1.00 m2 Pemasangan dinding keramik 20cm x 40cm 278,255 1.4 .
0.90 OH Pekerja 76,500 L.1
0.45 OH Tukang Batu 45,000 L.3
0.05 OH Kepala tukang 6,750 L.9
0.05 OH Mandor 8,325 L.10
1.10 m2 Keramik Dinding 20x40 93,500 M.75
9.30 Kg Semen 12,090 M.12
0.02 M3 Pasir Pasang 4,590 M.9
2.10 Kg Semen Warna 31,500 M.13
A.4.4.3.54. U-048 1.00 m2 Pemasangan dinding keramik 20cm x 60cm 348,655 1.4 .
0.90 OH Pekerja 76,500 L.1
0.45 OH Tukang Batu 45,000 L.3
0.05 OH Kepala tukang 6,750 L.9
0.05 OH Mandor 8,325 L.10
1.10 m2 Keramik Dinding 20x60 154,000 M.76
9.30 Kg Semen 12,090 M.12
0.02 M3 Pasir Pasang 4,590 M.9
2.76 Kg Semen Warna 41,400 M.13
A.4.4.3.54. U-049 1.00 m2 Pemasangan dinding keramik 30cm x 60cm 388,655 1.4 .
0.90 OH Pekerja 76,500 L.1
0.45 OH Tukang Batu 45,000 L.3

Software RAB Exarch xPro 24/396


0.05 OH Kepala tukang 6,750 L.9
0.05 OH Mandor 8,325 L.10
1.10 m2 Keramik Dinding 30x60 192,500 M.77
9.30 Kg Semen 12,090 M.12
0.02 M3 Pasir Pasang 4,590 M.9
2.86 Kg Semen Warna 42,900 M.13
A.4.4.3.54. U-050 1.00 m2 Pemasangan dinding keramik 40cm x 60cm 428,455 1.4 .
0.90 OH Pekerja 76,500 L.1
0.45 OH Tukang Batu 45,000 L.3
0.05 OH Kepala tukang 6,750 L.9
0.05 OH Mandor 8,325 L.10
1.10 m2 Keramik Dinding 40x60 214,500 M.78
10.30 Kg Semen 13,390 M.12
0.02 M3 Pasir Pasang 4,590 M.9
3.96 Kg Semen Warna 59,400 M.13
A.4.4.3.55. U-051 1.00 m2 Pemasangan dinding marmer 100cm x 100cm 486,160 2.1 .
1.30 OH Pekerja 110,500 L.1
0.65 OH Tukang Batu 65,000 L.3
0.07 OH Kepala tukang 9,750 L.9
0.07 OH Mandor 12,025 L.10
1.06 Bh marmer ukuran 100cm x 100cm 61,480 M.1364
12.44 Kg Semen 16,172 M.12
0.03 M3 Semen 33 M.12
0.65 Kg Pasir Pasang 165,750 M.9
3.03 Bh Semen Warna 45,450 M.13
A.4.4.3.17. U-052 1.00 m1 Pemasangan Plint Keramik 10cm x 30cm 38,952 0.2 .
0.09 OH Pekerja 7,650 L.1
0.09 OH Tukang Batu 9,000 L.3
0.01 OH Kepala tukang 1,350 L.9
0.01 OH Mandor 925 L.10
3.53 Bh Plint Keramik 10x30 17,650 M.85
1.24 kg Semen 1,612 M.12
0.00 M3 Pasir Pasang 765 M.9
A.4.4.3.18. U-053 1.00 m1 Pemasangan Plint Keramik 10cm x 40cm 41,177 0.2 .
0.09 OH Pekerja 7,650 L.1
0.09 OH Tukang Batu 9,000 L.3
0.01 OH Kepala tukang 1,350 L.9
0.01 OH Mandor 925 L.10
2.65 Bh Plint Keramik 10x40 19,875 M.86
1.24 kg Semen 1,612 M.12
0.00 M3 Pasir pasang 765 M.9
A.4.4.3.28. U-054 1.00 m1 Pemasangan Plint Keramik 10cm x 60cm 43,072 0.2 .
0.09 OH Pekerja 7,650 L.1
0.09 OH Tukang Batu 9,000 L.3
0.01 OH Kepala tukang 1,350 L.9
0.01 OH Mandor 925 L.10
1.70 Bh Plint Keramik 10x60 20,400 M.87
1.14 kg Semen 1,482 M.12
0.10 Kg Semen Warna 1,500 M.13
0.00 M3 Pasir Pasang 765 M.9
A.4.4.3.28.a U-055 1.00 m1 Pemasangan Corner Rope Tile (Kuku Keramik) 32,935 0.2 .
0.08 OH Pekerja 6,800 L.1
0.08 OH Tukang Batu 8,000 L.3
0.01 OH Kepala tukang 1,200 L.9
0.00 OH Mandor 740 L.10
5.00 bh Ballnose Rope Tile 2.5x20 12,500 M.74
1.10 kg Semen 1,430 M.12
0.10 Kg Semen Warna 1,500 M.13
0.00 M3 Pasir Pasang 765 M.9
A.4.4.3.64. U-056 1.00 m2 Pemasangan paving block natural tebal 6 cm 220,313 0.5 .
0.25 OH Pekerja 21,250 L.1
0.25 OH Tukang Kayu 25,000 L.6

Software RAB Exarch xPro 25/396


0.03 OH Kepala tukang 3,750 L.9
0.00 OH Mandor 463 L.10
1.01 M2 Paving block 6 cm 136,350 M.118
0.05 M3 Pasir beton 12,500 M.8
0.10 Ls Alat Bantu Kerja Paving Blok 21,000 A.1
PEKERJAAN PEMIPAAN DAN SANITASI
A.5.1.1 25. U-057 1.00 m1 Pemasangan pipa PVC tipe AW diameter 1/2” 22,130 0.1 .
0.04 OH Pekerja 3,060 L.1
0.06 OH Tukang batu 6,000 L.3
0.01 OH Kepala tukang 900 L.9
0.00 OH Mandor 370 L.10
1.20 M Pipa PVC 1/2" 4,800 M.46
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
A.5.1.1 26. U-058 1.00 m1 Pemasangan pipa PVC tipe AW diameter 3/4” 23,930 0.1 .
0.04 OH Pekerja 3,060 L.1
0.06 OH Tukang batu 6,000 L.3
0.01 OH Kepala tukang 900 L.9
0.00 OH Mandor 370 L.10
1.20 M Pipa PVC 3/4" 6,600 M.50
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
A.5.1.1 27. U-059 1.00 m1 Pemasangan pipa PVC tipe AW diameter 1” 24,530 0.1 .
0.04 OH Pekerja 3,060 L.1
0.06 OH Tukang batu 6,000 L.3
0.01 OH Kepala tukang 900 L.9
0.00 OH Mandor 370 L.10
1.20 M Pipa PVC 1” 7,200 M.47
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
A.5.1.1 31. U-060 1.00 m1 Pemasangan pipa PVC tipe AW diameter 3” 39,750 0.2 .
0.08 OH Pekerja 6,885 L.1
0.14 OH Tukang batu 13,500 L.3
0.01 OH Kepala tukang 2,025 L.9
0.00 OH Mandor 740 L.10
1.20 m1 Pipa PVC 3" 9,600 M.49
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
A.5.1.1 32. U-061 1.00 m1 Pemasangan pipa PVC tipe AW diameter 4” 40,950 0.2 .
0.08 OH Pekerja 6,885 L.1
0.14 OH Tukang batu 13,500 L.3
0.01 OH Kepala tukang 2,025 L.9
0.00 OH Mandor 740 L.10
1.20 m1 Pipa PVC 4" 10,800 M.51
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
A.5.1.1.1. U-062 1.00 bh Pemasangan closet duduk 2,936,600 4.6 .
3.30 OH Pekerja 280,500 L.1
1.10 OH Tukang batu 110,000 L.3
0.01 OH Kepala tukang 1,500 L.9
0.16 OH Mandor 29,600 L.10
1.00 Unit Kloset Duduk 2,500,000 M.43
0.06 Ls Perlengkapan Umum 15,000 A.4
A.5.1.1 2. U-063 1.00 bh Pemasangan closet jongkok 547,450 2.8 .
1.00 OH Pekerja 85,000 L.1
1.50 OH Tukang batu 150,000 L.3
0.15 OH Kepala tukang 22,500 L.9
0.16 OH Mandor 29,600 L.10
1.00 Unit Kloset Jongkok 250,000 M.44
6.00 Kg Semen 7,800 M.12
0.01 M3 Pasir pasang 2,550 M.9
A.5.1.1 5. U-064 1.00 bh Pemasangan wastafel 1,370,950 2.9 .
1.20 OH Pekerja 102,000 L.1
1.45 OH Tukang batu 145,000 L.3
0.15 OH Kepala tukang 22,500 L.9
0.06 OH Mandor 11,100 L.10
1.00 Unit Wastafel 1,050,000 M.55

Software RAB Exarch xPro 26/396


6.00 Kg Semen 7,800 M.12
0.01 M3 Pasir pasang 2,550 M.9
0.12 Ls Perlengkapan Umum 30,000 A.4
A.5.1.1 12. U-065 1.00 bh Pasang bak cuci piring (Kitchen Sink) stainlessteel 545,825 0.4 .
0.03 OH Pekerja 2,550 L.1
0.30 OH Tukang batu 30,000 L.3
0.03 OH Kepala tukang 4,500 L.9
0.02 OH Mandor 2,775 L.10
1.00 Unit Bak cuci piring 430,000 M.1156
1.00 Bh Waterdrain 76,000 M.1167
A.5.1.1 14. U-066 1.00 bh Pemasangan floor drain 73,275 0.1 .
0.01 OH Pekerja 850 L.1
0.10 OH Tukang batu 10,000 L.3
0.01 OH Kepala tukang 1,500 L.9
0.01 OH Mandor 925 L.10
1.00 Unit Floor drain 60,000 M.41
U-067 1.00 unit Septik Tank Single Kompartmen, 1.6x0.8x1.6-1.2m3 (5 or 3,114,694 13.8 .
9.69 OH Pekerja 823,797 L.1
0.51 OH Mandor 95,154 L.10
3.28 OH Tukang Batu 328,213 L.3
0.33 OH Kepala Tukang 49,242 L.9
585.39 bh Bata merah 380,501 M.2
273.98 Kg Semen 356,173 M.12
0.63 m3 Pasir Pasang 159,379 M.9
0.10 m3 Kerikil 21,060 M.7
23.36 m1 Besi Ø10 (Polos) 148,655 M.17
3.00 m1 Pipa PVC 4" 27,000 M.51
4.00 m1 Pipa PVC 3" 32,000 M.49
1.00 m1 Pipa PVC 1” 6,000 M.47
1.00 bh T Bow 4" 65,000 M.54
1.00 bh T Bow 3" 35,000 M.53
1.00 bh Dop 3" 35,000 M.40
0.16 m2 Pelat 1/8" 42,400 M.28
1.92 kg Kawat Beton 45,120 M.27
3.00 bh Baut M10 15,000 M.108
1.80 Ls Perlengkapan Umum 450,000 A.4
U-068 1.00 unit Septik Tank Double Kompartmen, 1.6x0.8x1.3 ,1.66m3 (1 3,094,090 13.4 .
9.33 OH Pekerja 792,744 L.1
0.49 OH Mandor 90,745 L.10
3.29 OH Tukang Batu 329,120 L.3
0.33 OH Kepala Tukang 49,378 L.9
599.20 bh Bata merah 389,480 M.2
276.34 Kg Semen 359,248 M.12
0.63 m3 Pasir Pasang 161,141 M.9
0.10 m3 Kerikil 21,060 M.7
23.36 m1 Besi Ø10 (Polos) 148,655 M.17
3.00 m1 Pipa PVC 4" 27,000 M.51
4.00 m1 Pipa PVC 3" 32,000 M.49
1.00 m1 Pipa PVC 1” 6,000 M.47
1.00 bh T Bow 4" 65,000 M.54
1.00 bh T Bow 3" 35,000 M.53
1.00 bh Dop 3" 35,000 M.40
0.16 m2 Pelat 1/8" 42,400 M.28
1.92 kg Kawat Beton 45,120 M.27
3.00 bh Baut M10 15,000 M.108
1.80 Ls Perlengkapan Umum 450,000 A.4
U-069 1.00 Unit Pek. Pembuatan Sumur Resapan dengan Buis 80 cm, Ked 1,492,503 6.4 .
0.28 OH Mandor 51,110 L.10
0.00 OH Kepala Tukang 267 L.9
3.02 OH Tukang Batu 301,749 L.3
3.10 OH Pekerja 263,602 L.1
23.59 kg Semen 30,667 M.12

Software RAB Exarch xPro 27/396


0.03 m3 Pasir Pasang 8,706 M.9
0.05 m3 Kerikil 10,462 M.7
13.67 Ltr Air 684 M.1
15.20 m1 Besi Ø8 (Polos) 62,182 M.22
1.22 kg Kawat Beton 28,576 M.27
3.00 bh Baut M10 15,000 M.108
0.64 m2 Pelat 1/8" 168,500 M.28
3.00 m1 Pipa PVC 3" 24,000 M.49
2.00 bh T Bow 3" 70,000 M.53
3.00 BH Buis beton D. 80 cm 186,000 M.117
0.10 m3 Ijuk 21,000 M.6
1.00 Ls Perlengkapan Umum 250,000 A.4
AK-I.2016.(9) U-070 unit Pekerjaan Pasangan Shower Mandi 516,625 0.3 .
1.00 Unit Shower Mandi 460,000 M.52
0.10 Ls Perlengkapan Umum 25,000 A.4
0.20 Oh Pekerja 17,000 L.1
0.10 Oh Tukang Pipa 10,000 L.8
0.03 Oh Mandor 4,625 L.10
AK-I.2016.(10) U-071 unit Pekerjaan Pasangan Tangki Air 1,422,125 0.8 .
1.00 Unit Tangki Air 1,200,000 M.133
0.60 Ls Perlengkapan Umum 150,000 A.4
0.50 Oh Pekerja 42,500 L.1
0.25 Oh Tukang Pipa 25,000 L.8
0.03 Oh Mandor 4,625 L.10
PEKERJAAN LANGIT-LANGIT (PLAFON)
A.4.2.1.21. U-072 1.00 m2 Pek. rangka Plafon Hollow Galvanish, modul 60 x 120 cm 132,580 0.8 .
0.35 OH Pekerja 29,750 L.1
0.35 OH Tukang Besi 35,000 L.4
0.04 OH Kepala Tukang 5,250 L.9
0.02 OH Mandor 3,330 L.10
3.50 M1 Hollow 4/4 Galvanish 24,500 M.26
1.75 M1 Hollow 2/4 Galvanish 8,750 M.24
2.00 bh Suspension Rod 12,000 M.116
18.00 bh Screw 9,000 M.113
0.02 Ls Perlengkapan Umum 5,000 A.4
A.4.5.1.7. U-073 1.00 m2 Pemasangan langit-langit gypsum board ukuran (120x24 46,926 0.2 .
0.10 OH Pekerja 8,500 L.1
0.05 OH Tukang kayu 5,000 L.6
0.01 OH Kepala tukang 750 L.9
0.01 OH Mandor 925 L.10
0.36 Lbr Gypsum board 9 mm 31,668 M.56
0.11 kg Paku sekrup 83 M.112
A.4.5.1.5. U-074 1.00 m2 Pemasangan langit-langit tripleks ukuran (120 x 240) cm 53,340 0.2 .
0.10 OH Pekerja 8,500 L.1
0.10 OH Tukang kayu 10,000 L.6
0.01 OH Kepala tukang 1,500 L.9
0.01 OH Mandor 925 L.10
0.38 Lbr Tripleks 31,875 M.62
0.03 kg Paku tripleks 540 M.1143
A.4.5.1.9. U-075 1.00 m1 Pemasangan list langit-langit kayu profil 13,819 0.1 .
0.05 OH Pekerja 4,250 L.1
0.05 OH Tukang Kayu 5,000 L.6
0.01 OH Kepala tukang 750 L.9
0.00 OH Mandor 555 L.10
1.05 m List kayu profil 3,014 M.140
0.01 kg Paku Biasa 2" - 5" 250 M.111
A.4.5.1.10. U-076 1.00 m2 Pemasangan List Plafond PVC 53,875 0.2 .
0.10 OH Pekerja 8,500 L.1
0.05 OH Tukang Kayu 5,000 L.6
0.01 OH Kepala tukang 750 L.9
0.01 OH Mandor 925 L.10
1.05 M' List Plafon 35,700 M.57

Software RAB Exarch xPro 28/396


6.00 bh Screw 3,000 M.113
PEKERJAAN ATAP
A.4.2.1.22. U-077 1.00 m2 (K3) Pemasangan atap pelana rangka atap baja canai din 258,104 1.6 .
0.76 OH Pekerja 64,634 L.1
0.76 OH Tukang Besi 76,040 L.4
0.08 OH Kepala Tukang 11,400 L.9
0.04 OH Mandor 7,030 L.10
4.05 m1 Baja Ringan-C Truss 54,000 M.36
0.10 Ls Alat Bantu Rangka Baja Ringan 45,000 A.3
A.4.2.1.23. U-078 1.00 m2 (K3) Pemasangan atap jurai rangka atap baja canai dingi 252,585 1.6 .
0.73 OH Pekerja 62,390 L.1
0.73 OH Tukang Besi 73,400 L.4
0.07 OH Kepala Tukang 10,950 L.9
0.04 OH Mandor 6,845 L.10
4.05 m1 Baja Ringan-C Truss 54,000 M.36
0.10 Ls Alat Bantu Rangka Baja Ringan 45,000 A.3
A.4.2.1.24. U-079 1.00 m2 Pemasangan PASANG KUDA-KUDA BAJA RINGAN + 250,450 0.7 .
0.20 OH Pekerja 17,000 L.1
0.45 OH Tukang Besi 45,000 L.4
0.01 OH Kepala Tukang 1,500 L.9
0.05 OH Mandor 9,250 L.10
3.72 M' Baja Ringan-C Truss 49,600 M.36
28.00 bh Screw 14,000 M.113
2.00 bh Baut Ramset / Dina Bolt 30,000 M.109
5.40 M' Baja Ringan-Reng Truss 36,000 M.35
0.12 M' Talang Jurai 3,100 M.39
0.10 Ls Alat Bantu Rangka Baja Ringan 45,000 A.3
A.4.5.2.32. U-080 1.00 m2 Pemasangan genteng metal ukuran 80 x 100 atap pelana 178,985 0.3 .
0.20 OH Pekerja 17,000 L.1
0.10 OH Tukang Kayu 10,000 L.6
0.01 OH Kepala tukang 1,500 L.9
0.00 OH Mandor 185 L.10
1.30 Bh Atap Genteng Metal 145,600 M.33
0.20 Kg Paku Biasa ½" - 1" 4,700 M.110
A.4.5.2.33. U-081 1.00 m2 Pemasangan genteng metal ukuran 80 x 100 atap Jurai/L 257,385 0.3 .
0.20 OH Pekerja 17,000 L.1
0.10 OH Tukang Kayu 10,000 L.6
0.01 OH Kepala tukang 1,500 L.9
0.00 OH Mandor 185 L.10
2.00 Bh Atap Genteng Metal 224,000 M.33
0.20 Kg Paku Biasa ½" - 1" 4,700 M.110
A.4.5.2.37. U-082 1.00 m1 Pemasangan nok genteng metal 133,455 0.4 .
0.25 OH Pekerja 21,250 L.1
0.15 OH Tukang Kayu 15,000 L.6
0.02 OH Kepala tukang 2,250 L.9
0.01 OH Mandor 2,405 L.10
1.10 Bh nok genteng metal 91,300 M.37
0.05 Kg Paku Biasa 2" - 5" 1,250 M.111
A.4.6.1.21. U-083 1.00 m1 Pemasangan lisplank ukuran (3 x 20) cm, kayu kelas I ata 128,885 0.3 .
0.10 OH Pekerja 8,500 L.1
0.20 OH Tukang kayu 20,000 L.6
0.02 OH Kepala tukang 3,000 L.9
0.01 OH Mandor 925 L.10
0.01 m3 Papan Kayu 2x20-K.I 93,960 M.105
0.10 kg Paku Biasa 2" - 5" 2,500 M.111
A.4.2.1.18. U-084 1.00 m1 Pemasangan talang datar/ jurai seng bjls 28 lebar 90 cm 149,060 0.4 .
0.20 OH Pekerja 17,000 L.1
0.20 OH Tukang Atap 20,000 L.2
0.02 OH Kepala tukang 3,000 L.9
0.00 OH Mandor 185 L.10
0.60 lbr Seng Gelombang 3" x 6" BJLS 28 42,000 M.61
0.02 kg Paku Biasa 2" - 5" 375 M.111

Software RAB Exarch xPro 29/396


0.02 m3 Kayu Papan kelas II 66,500 M.1086
A.4.2.1.19 U-085 1.00 m1 Pemasangan talang ½ lingkaran D-15 cm, seng plat bjls 97,230 0.5 .
0.15 OH Pekerja 12,750 L.1
0.30 OH Tukang Atap 30,000 L.2
0.03 OH Kepala tukang 4,500 L.9
0.01 OH Mandor 1,480 L.10
0.60 lbr Seng Gelombang 3" x 6" BJLS 28 42,000 M.61
0.01 kg Paku Biasa 2" - 5" 250 M.111
0.50 kg Baja strip (0,2 x 2) cm 6,250 M.15
PEKERJAAN PEMIPAAN DAN SANITASI
A.5.1.1 25. U-086 1.00 m1 Pemasangan pipa PVC tipe AW diameter 1/2” 22,130 0.1 .
0.04 OH Pekerja 3,060 L.1
0.06 OH Tukang batu 6,000 L.3
0.01 OH Kepala tukang 900 L.9
0.00 OH Mandor 370 L.10
1.20 M Pipa PVC 1/2" 4,800 M.46
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
A.5.1.1 26. U-087 1.00 m1 Pemasangan pipa PVC tipe AW diameter 3/4” 23,930 0.1 .
0.04 OH Pekerja 3,060 L.1
0.06 OH Tukang batu 6,000 L.3
0.01 OH Kepala tukang 900 L.9
0.00 OH Mandor 370 L.10
1.20 M Pipa PVC 3/4" 6,600 M.50
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
A.5.1.1 27. U-088 1.00 m1 Pemasangan pipa PVC tipe AW diameter 1” 24,530 0.1 .
0.04 OH Pekerja 3,060 L.1
0.06 OH Tukang batu 6,000 L.3
0.01 OH Kepala tukang 900 L.9
0.00 OH Mandor 370 L.10
1.20 M Pipa PVC 1” 7,200 M.47
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
A.5.1.1 31. U-089 1.00 m1 Pemasangan pipa PVC tipe AW diameter 3” 39,750 0.2 .
0.08 OH Pekerja 6,885 L.1
0.14 OH Tukang batu 13,500 L.3
0.01 OH Kepala tukang 2,025 L.9
0.00 OH Mandor 740 L.10
1.20 m1 Pipa PVC 3" 9,600 M.49
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
A.5.1.1 32. U-090 1.00 m1 Pemasangan pipa PVC tipe AW diameter 4” 40,950 0.2 .
0.08 OH Pekerja 6,885 L.1
0.14 OH Tukang batu 13,500 L.3
0.01 OH Kepala tukang 2,025 L.9
0.00 OH Mandor 740 L.10
1.20 m1 Pipa PVC 4" 10,800 M.51
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
A.5.1.1 19. U-091 1.00 bh Pemasangan kran diameter ½” atau 3/4” 72,888 0.5 .
0.01 OH Pekerja 850 L.1
0.40 OH Tukang batu 40,000 L.3
0.04 OH Kepala tukang 6,000 L.9
0.01 OH Mandor 925 L.10
1.00 M Kran air 25,000 M.45
0.03 bh Sealtape 113 M.144
A.5.1.1.1. U-092 1.00 bh Pemasangan closet duduk 2,936,600 4.6 .
3.30 OH Pekerja 280,500 L.1
1.10 OH Tukang batu 110,000 L.3
0.01 OH Kepala tukang 1,500 L.9
0.16 OH Mandor 29,600 L.10
1.00 Unit Kloset Duduk 2,500,000 M.43
0.06 Ls Perlengkapan Umum 15,000 A.4
A.5.1.1 2. U-093 1.00 bh Pemasangan closet jongkok 547,450 2.8 .
1.00 OH Pekerja 85,000 L.1
1.50 OH Tukang batu 150,000 L.3

Software RAB Exarch xPro 30/396


0.15 OH Kepala tukang 22,500 L.9
0.16 OH Mandor 29,600 L.10
1.00 Unit Kloset Jongkok 250,000 M.44
6.00 Kg Semen 7,800 M.12
0.01 M3 Pasir pasang 2,550 M.9
A.5.1.1 5. U-094 1.00 bh Pemasangan wastafel 1,370,950 2.9 .
1.20 OH Pekerja 102,000 L.1
1.45 OH Tukang batu 145,000 L.3
0.15 OH Kepala tukang 22,500 L.9
0.06 OH Mandor 11,100 L.10
1.00 Unit Wastafel 1,050,000 M.55
6.00 Kg Semen 7,800 M.12
0.01 M3 Pasir pasang 2,550 M.9
0.12 Ls Perlengkapan Umum 30,000 A.4
A.5.1.1 12. U-095 1.00 bh Pasang bak cuci piring (Kitchen Sink) stainlessteel 545,825 0.4 .
0.03 OH Pekerja 2,550 L.1
0.30 OH Tukang batu 30,000 L.3
0.03 OH Kepala tukang 4,500 L.9
0.02 OH Mandor 2,775 L.10
1.00 Unit Bak cuci piring 430,000 M.1156
1.00 Bh Waterdrain 76,000 M.1167
A.5.1.1 14. U-096 1.00 bh Pemasangan floor drain 73,275 0.1 .
0.01 OH Pekerja 850 L.1
0.10 OH Tukang batu 10,000 L.3
0.01 OH Kepala tukang 1,500 L.9
0.01 OH Mandor 925 L.10
1.00 Unit Floor drain 60,000 M.41
U-097 1.00 unit Septik Tank Single Kompartmen, 1.6x0.8x1.6-1.2m3 (5 or 3,061,603 13.8 .
9.69 OH Pekerja 823,797 L.1
0.51 OH Mandor 95,154 L.10
3.28 OH Tukang Batu 328,213 L.3
0.33 OH Kepala Tukang 49,242 L.9
585.39 bh Bata merah 380,501 M.2
273.98 Kg Semen 356,173 M.12
0.63 m3 Pasir Pasang 159,379 M.9
0.10 m3 Kerikil 21,060 M.7
23.36 m1 Besi Ø8 (Polos) 95,564 M.22
3.00 m1 Pipa PVC 4" 27,000 M.51
4.00 m1 Pipa PVC 3" 32,000 M.49
1.00 m1 Pipa PVC 1” 6,000 M.47
1.00 bh T Bow 4" 65,000 M.54
1.00 bh T Bow 3" 35,000 M.53
1.00 bh Dop 3" 35,000 M.40
0.16 m2 Pelat 1/8" 42,400 M.28
1.92 kg Kawat Beton 45,120 M.27
3.00 bh Baut M10 15,000 M.108
1.80 Ls Perlengkapan Umum 450,000 A.4
U-098 1.00 unit Septik Tank Double Kompartmen, 1.6x0.8x1.3 ,1.66m3 (1 3,040,999 13.4 .
9.33 OH Pekerja 792,744 L.1
0.49 OH Mandor 90,745 L.10
3.29 OH Tukang Batu 329,120 L.3
0.33 OH Kepala Tukang 49,378 L.9
599.20 bh Bata merah 389,480 M.2
276.34 Kg Semen 359,248 M.12
0.63 m3 Pasir Pasang 161,141 M.9
0.10 m3 Kerikil 21,060 M.7
23.36 m1 Besi Ø8 (Polos) 95,564 M.22
3.00 m1 Pipa PVC 4" 27,000 M.51
4.00 m1 Pipa PVC 3" 32,000 M.49
1.00 m1 Pipa PVC 1” 6,000 M.47
1.00 bh T Bow 4" 65,000 M.54
1.00 bh T Bow 3" 35,000 M.53

Software RAB Exarch xPro 31/396


1.00 bh Dop 3" 35,000 M.40
0.16 m2 Pelat 1/8" 42,400 M.28
1.92 kg Kawat Beton 45,120 M.27
3.00 bh Baut M10 15,000 M.108
1.80 Ls Perlengkapan Umum 450,000 A.4
U-099 1.00 Unit Pek. Pembuatan Sumur Resapan dengan Buis 80 cm, Ked 1,471,503 6.4 .
0.28 OH Mandor 51,110 L.10
0.00 OH Kepala Tukang 267 L.9
3.02 OH Tukang Batu 301,749 L.3
3.10 OH Pekerja 263,602 L.1
23.59 kg Semen 30,667 M.12
0.03 m3 Pasir Pasang 8,706 M.9
0.05 m3 Kerikil 10,462 M.7
13.67 Ltr Air 684 M.1
15.20 m1 Besi Ø8 (Polos) 62,182 M.22
1.22 kg Kawat Beton 28,576 M.27
3.00 bh Baut M10 15,000 M.108
0.64 m2 Pelat 1/8" 168,500 M.28
3.00 m1 Pipa PVC 3" 24,000 M.49
2.00 bh T Bow 3" 70,000 M.53
3.00 BH Buis beton D. 80 cm 186,000 M.117
1.00 Ls Perlengkapan Umum 250,000 A.4
AK-I.2016.(9) U-100 unit Pekerjaan Pasangan Shower Mandi 516,625 0.3 .
1.00 Unit Shower Mandi 460,000 M.52
0.10 Ls Perlengkapan Umum 25,000 A.4
0.20 Oh Pekerja 17,000 L.1
0.10 Oh Tukang Pipa 10,000 L.8
0.03 Oh Mandor 4,625 L.10
AK-I.2016.(10) U-101 unit Pekerjaan Pasangan Tangki Air 1,422,125 0.8 .
1.00 Unit Tangki Air 1,200,000 M.133
0.60 Ls Perlengkapan Umum 150,000 A.4
0.50 Oh Pekerja 42,500 L.1
0.25 Oh Tukang Pipa 25,000 L.8
0.03 Oh Mandor 4,625 L.10
PEKERJAAN ELEKTRIKAL
AK-I.2016.(14) U-102 Unit Pekerjaan Pasangan Box MCB 507,700 0.6 .
1.00 Unit MCB + Box 350,000 M.92
0.40 Ls Perlengkapan Umum 100,000 A.4
0.40 Oh Pekerja 34,000 L.1
0.20 Oh Tukang Listrik 20,000 L.7
0.02 Oh Mandor 3,700 L.10
AK-I.2016.(15) U-103 btg Pekerjaan Pasangan Pembumian (Grounding) 807,700 0.6 .
1.00 btg Grounding Rod 650,000 M.31
0.40 Ls Perlengkapan Umum 100,000 A.4
0.40 Oh Pekerja 34,000 L.1
0.20 Oh Tukang Listrik 20,000 L.7
0.02 Oh Mandor 3,700 L.10
AK-I.2016.(16) U-104 m1 Pekerjaan Instalasi Kabel NYM-3x2.5m2 18,260 0.0 .
1.10 m1 Kabel NYM 3x2,5 mm2-SNI 11,440 M.88
0.02 Ls Perlengkapan Umum 3,750 A.4
0.02 Oh Pekerja 1,700 L.1
0.01 Oh Tukang Listrik 1,000 L.7
0.00 Oh Mandor 370 L.10
AK-I.2016.(17) U-105 m1 Pekerjaan Instalasi Kabel NYM 2x1,5 mm2 11,730 0.0 .
1.10 m1 Kabel NYM 2x1,5 mm2-SNI 6,160 M.89
0.01 Ls Perlengkapan Umum 2,500 A.4
0.02 Oh Pekerja 1,700 L.1
0.01 Oh Tukang Listrik 1,000 L.7
0.00 Oh Mandor 370 L.10
AK-I.2016.(23) U-106 unit Pekerjaan Pasangan Colokan Listrik (Receiptackle) 42,190 0.1 .
1.00 unit Receiptackle 30,000 M.91
0.03 Ls Perlengkapan Umum 6,250 A.4

Software RAB Exarch xPro 32/396


0.04 Oh Pekerja 3,570 L.1
0.02 Oh Tukang Listrik 2,000 L.7
0.00 Oh Mandor 370 L.10
AK-I.2016.(18) U-107 Unit Pekerjaan Pasangan Fitting Lampu 35,770 0.1 .
1.00 unit Fitting Lampu 25,000 M.93
0.02 Ls Perlengkapan Umum 5,000 A.4
0.04 Oh Pekerja 3,400 L.1
0.02 Oh Tukang Listrik 2,000 L.7
0.00 Oh Mandor 370 L.10
AK-I.2016.(19) U-108 unit Pekerjaan Pasangan Saklar Lampu 36,770 0.1 .
1.00 unit Saklar Listrik 25,000 M.90
0.02 Ls Perlengkapan Umum 6,000 A.4
0.04 Oh Pekerja 3,400 L.1
0.02 Oh Tukang Listrik 2,000 L.7
0.00 Oh Mandor 370 L.10
AK-I.2016.(20) U-109 unit Pekerjaan Pasangan Lampu 5 W 31,085 0.1 .
1.00 unit Lampu 5W 24,000 M.131
0.01 Ls Perlengkapan Umum 2,500 A.4
0.04 Oh Pekerja 3,400 L.1
0.01 Oh Tukang Listrik 1,000 L.7
0.00 Oh Mandor 185 L.10
AK-I.2016.(21) U-110 unit Pekerjaan Pasangan Lampu 15 W 46,085 0.1 .
1.00 unit Lampu 15W 39,000 M.129
0.01 Ls Perlengkapan Umum 2,500 A.4
0.04 Oh Pekerja 3,400 L.1
0.01 Oh Tukang Listrik 1,000 L.7
0.00 Oh Mandor 185 L.10
AK-I.2016.(22) U-111 unit Pekerjaan Pasangan Lampu 20 W 52,085 0.1 .
1.00 unit Lampu 20W 45,000 M.130
0.01 Ls Perlengkapan Umum 2,500 A.4
0.04 Oh Pekerja 3,400 L.1
0.01 Oh Tukang Listrik 1,000 L.7
0.00 Oh Mandor 185 L.10
AK-I.2016.(26) U-112 Ls Penyambungan Instalasi Listrik PLN 2,500,000 - .
1.00 Ls Listrik PLN 2,500,000 M.139
AK-I.2016.(27) U-113 Ls Penyambungan Instalasi Air PDAM 2,300,000 - .
1.00 Ls Instalasi PDAM 2,300,000 M.135
PEKERJAAN CAT DAN LABURAN
AK-I.2016.(28) U-114 m2 Pekerjaan Pekerjaan Plamir (1 Lapis) 15,000 0.1 .
0.10 kg Plamir 1,200 M.11
0.50 Lbr Amplas 1,750 M.134
0.02 oh Pekerja 1,700 L.1
0.07 oh Tukang Cat 7,000 L.5
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 1,850 L.10
AK-I.2016.(29) U-115 m2 Pekerjaan Cat Anti Lumut dan Waterproofing 19,050 0.1 .
0.10 kg Cat Waterproofing 5,000 M.68
0.50 Lbr Amplas 1,750 M.134
0.01 ea Rol Cat 250 M.143
0.02 oh Pekerja 1,700 L.1
0.07 oh Tukang Cat 7,000 L.5
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 1,850 L.10
A.4.7.1.10. U-116 1.00 m2 Pengecatan tembok baru Interior ( 1lapis plamuur, 1 lapi 18,519 0.1 .
0.02 OH Pekerja 1,700 L.1
0.06 OH Tukang cat 6,300 L.5
0.01 OH Kepala tukang 945 L.9
0.00 OH Mandor 555 L.10
0.10 Kg Plamir 1,200 M.11
0.10 Kg Cat Dasar Tembok (Interior) 2,619 M.64
0.26 Kg Cat Tembok (Interior) 5,200 M.66
A.4.7.1.10. U-117 1.00 m2 Pengecatan tembok baru Exterior ( 1lapis plamuur, 1 lapi 20,869 0.1 .

Software RAB Exarch xPro 33/396


0.02 OH Pekerja 1,700 L.1
0.06 OH Tukang cat 6,300 L.5
0.01 OH Kepala tukang 945 L.9
0.00 OH Mandor 555 L.10
0.10 Kg Plamir 1,200 M.11
0.10 Kg Cat Dasar Tembok (Exterior) 3,929 M.63
0.26 Kg Cat Tembok (Exterior) 6,240 M.65
A.4.7.1.10. a U-118 1.00 m2 Pengecatan Langit (langit-langit) 19,150 0.1 .
0.02 OH Pekerja 1,700 L.1
0.06 OH Tukang cat 6,300 L.5
0.01 OH Kepala tukang 945 L.9
0.00 OH Mandor 555 L.10
0.10 Kg Plamir 1,200 M.11
0.26 Kg Cat Plafon 8,450 M.67
A.4.7.1.16. U-119 1.00 m2 Pengecatan permukaan baja/besi 30,133 0.2 .
0.02 OH Pekerja 1,700 L.1
0.20 OH Tukang cat 20,000 L.5
0.02 OH Kepala tukang 3,000 L.9
0.00 OH Mandor 463 L.10
0.10 Kg Cat Besi 4,800 M.70
0.01 Bh Kuas 170 M.138
A.4.7.1.4. U-120 1.00 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat 42,685 0.1 .
0.07 OH Pekerja 5,950 L.1
0.01 OH Tukang cat 900 L.5
0.01 OH Kepala tukang 900 L.9
0.00 OH Mandor 555 L.10
0.20 Kg Cat meni 3,260 M.69
0.15 Kg Plamir 1,800 M.11
0.17 Kg Cat Dasar Kayu/Besi 11,050 M.71
0.26 Kg Cat kayu 15,600 M.72
0.01 Bh Kuas 170 M.138
0.03 Ltr Tinner 1,800 M.73
0.20 Lbr Amplas 700 M.134
PEKERJAAN PINTU JENDELA DAN ACCESORIS
AK-I.2016.(2) U-121 1.00 unit Pekerjaan Pasangan Pintu utama type P1 2,341,000 1.4 .
1.00 set Pintu Utama (Kusen+Panel) Type P1 2,100,000 M.119
0.40 Ls Perlengkapan Umum 100,000 A.4
0.50 Oh Pekerja 42,500 L.1
0.80 Oh Tukang Kayu 80,000 L.6
0.10 Oh Mandor 18,500 L.10
AK-I.2016.(3) U-122 1.00 unit Pekerjaan Pasangan Pintu Ruangan type P2 1,841,000 1.4 .
1.00 set Pintu Utama (Kusen+Panel) Type P2 1,600,000 M.120
0.40 Ls Perlengkapan Umum 100,000 A.4
0.50 Oh Pekerja 42,500 L.1
0.80 Oh Tukang Kayu 80,000 L.6
0.10 Oh Mandor 18,500 L.10
AK-I.2016.(4) U-123 1.00 unit Pekerjaan Pasangan Pintu WC type P3 1,341,000 1.4 .
1.00 set Pintu Utama (Kusen+Panel) Type P3 1,100,000 M.121
0.40 Ls Perlengkapan Umum 100,000 A.4
0.50 Oh Pekerja 42,500 L.1
0.80 Oh Tukang Kayu 80,000 L.6
0.10 Oh Mandor 18,500 L.10
AK-I.2016.(5) U-124 unit Pekerjaan Pasangan Jendela type J1 1,124,750 1.0 .
1.00 set Jendela Type J1 980,000 M.122
0.20 Ls Perlengkapan Umum 50,000 A.4
0.30 Oh Pekerja 25,500 L.1
0.60 Oh Tukang Kayu 60,000 L.6
0.05 Oh Mandor 9,250 L.10
AK-I.2016.(6) U-125 unit Pekerjaan Pasangan Jendela type J2 835,450 1.4 .
1.00 set Jendela Type J2 600,000 M.123
0.40 Ls Perlengkapan Umum 100,000 A.4
0.50 Oh Pekerja 42,500 L.1

Software RAB Exarch xPro 34/396


0.80 Oh Tukang Kayu 80,000 L.6
0.07 Oh Mandor 12,950 L.10
AK-I.2016.(7) U-126 1.00 unit Pekerjaan Pasangan Jendela type J3 2,868,000 1.7 .
1.00 set Jendela Type J3 2,500,000 M.124
0.80 Ls Perlengkapan Umum 200,000 A.4
0.70 Oh Pekerja 59,500 L.1
0.90 Oh Tukang Kayu 90,000 L.6
0.10 Oh Mandor 18,500 L.10
AK-I.2016.(8) U-127 1.00 unit Pekerjaan Pasangan Lubang Angin/Roster 35,700 0.1 .
1.00 Unit Lubang Angin 25,500 M.126
0.01 Ls Perlengkapan Umum 2,500 A.4
0.01 Oh Pekerja 850 L.1
0.05 Oh Tukang Batu 5,000 L.3
0.01 Oh Mandor 1,850 L.10
PEKERJAAN KONSTRUKSI BAJA BERAT
A.4.2.1.1.(a) U-128 1.00 kg Pekerjaan perakitan baja siku 34,873 0.1 .
1.03 kg Baja Siku 16,195 M.1108
0.04 kg Kawat las listrik 5,400 M.137
0.03 ltr solar 255 M.1502
0.00 ltr Minyak pelumas 140 M.1496
0.00 unit Sewa alat las 225 A.6
0.03 oh tukang las 4,805 L.14
0.01 oh Kepala Tukang 1,200 L.9
0.08 oh pekerja 6,375 L.1
0.00 oh mandor 278 L.10
A.4.2.1.1.(b) U-129 1.00 kg Pekerjaan Perakitan baja WF 32,859 0.1 .
1.03 kg Baja WF 18,245 M.1109
0.03 kg Kawat las listrik 3,375 M.137
0.02 ltr solar 170 M.1502
0.00 ltr Minyak pelumas 88 M.1496
0.00 unit Sewa alat las 375 A.6
0.02 oh Tukang las 3,204 L.14
0.01 oh Kepala Tukang 750 L.9
0.08 oh pekerja 6,375 L.1
0.00 oh mandor 278 L.10
A.4.2.1.1.(c) U-130 1.00 cm Pemotongan Baja dengan Las Oxy Acetilene 14,303 0.0 .
0.00 Cyl Gas Oxigen 4,676 M.1503
0.00 Cyl Gas Aceteline 7,400 M.1504
0.01 jam Sewa alat las 1,500 A.6
0.00 oh Pekerja 340 L.1
0.00 oh Tukang Las 320 L.14
0.00 oh Kepala Tukang 30 L.9
0.00 oh Mandor 37 L.10
A.4.2.1.1.(d) U-131 1.00 cm Pemotongan Baja dengan Mesin Gerinda Potong 2,852 0.0 .
0.02 jam Sewa mesin gerinda potong 2,125 A.31
0.00 oh Pekerja 340 L.1
0.00 oh Tukang Las 320 L.14
0.00 oh Kepala Tukang 30 L.9
0.00 oh Mandor 37 L.10
A.4.2.1.1.(e) U-132 1.00 cm Penyambungan Pengelasan Busur Las Listrik (Arc Weldi 9,072 0.0 .
0.04 kg Kawat las listrik 5,400 M.137
0.03 ltr Solar 255 M.1502
0.00 ltr Minyak pelumas 140 M.1496
0.02 jam Sewa alat las 2,550 A.6
0.00 oh Pekerja 340 L.1
0.00 oh Tukang Las 320 L.14
0.00 oh Kepala Tukang 30 L.9
0.00 oh Mandor 37 L.10
A.4.2.1.1.(f) U-133 1.00 cm Penyambungan Pengelasan Las Gas (Gas Welding) 10,336 0.0 .
0.04 kg Kawat las gas 1,800 M.1127
0.00 Cyl Gas Oxigen 1,559 M.1503
0.00 Cyl Gas Aceteline 3,700 M.1504

Software RAB Exarch xPro 35/396


0.02 jam Sewa alat las 2,550 A.6
0.00 oh Pekerja 340 L.1
0.00 oh Tukang Las 320 L.14
0.00 oh Kepala Tukang 30 L.9
0.00 oh Mandor 37 L.10
A.4.2.1.1.(g) U-134 1.00 cm Pekerjaan Sambungan Dengan Solder (Pateri Lunak) 17,013 0.0 .
0.01 kg Kawat Solder (Timah) 8,750 M.1505
0.00 Cyl Gas Oxigen 3,117 M.1503
0.00 Cyl Gas Aceteline 1,850 M.1504
0.01 jam Sewa alat las 1,500 A.6
0.00 oh Pekerja 340 L.1
0.01 oh Tukang Las 1,121 L.14
0.00 oh Kepala Tukang 150 L.9
0.00 oh Mandor 185 L.10
A.4.2.1.1.(h) U-135 1.00 cm Pekerjaan Sambungan Dengan Brazing (Pateri Keras) 34,223 0.0 .
0.01 kg Kawat Brazing (Kuningan) 9,500 M.1506
0.01 Cyl Gas Oxigen 14,027 M.1503
0.00 Cyl Gas Aceteline 7,400 M.1504
0.01 jam Sewa alat las 1,500 A.6
0.00 oh Pekerja 340 L.1
0.01 oh Tukang Las 1,121 L.14
0.00 oh Kepala Tukang 150 L.9
0.00 oh Mandor 185 L.10
A.4.2.1.1.(i) U-136 1.00 m2 Meratakan Permukaan Baja dengan Gerinda 104,934 0.3 .
0.70 bh Batu Gerinda 52,500 M.1491
0.10 Ls Perlengkapan Umum 25,000 A.4
0.20 oh Pekerja 17,000 L.1
0.05 oh Tukang Las 8,009 L.14
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
PAKET SATUAN PEKERJAAN
U-137 1.00 unit Meja Beton Ukuran 2,6m x 1m 5,495,080 9.2 .
5.75 OH Pekerja 488,433 L.1
2.87 OH Tukang Batu 286,588 L.3
0.29 OH Kepala Tukang 43,004 L.9
0.30 OH Mandor 54,588 L.10
133.93 bh Bata merah 87,057 M.2
191.00 Kg Semen 248,304 M.12
0.42 m3 Pasir Pasang 106,240 M.9
0.16 m3 Kerikil 34,222 M.7
2.18 m2 Marmer 982,800 M.1363
10.27 Kg Semen Warna 154,050 M.13
2.73 m2 keramik Dinding 20cm x 20cm 170,625 M.1356
0.38 Kg Plamir 4,592 M.11
0.99 Kg Cat Penutup Tembok 34,823 M.1336
34.25 m1 Besi Ø8 (Polos) 140,100 M.22
1.14 kg Kawat Beton 26,827 M.27
0.04 m3 Papan Kayu 2x20-K.II 187,200 M.106
0.03 m3 Balok Kayu 4x6-K.II 95,629 M.98
1.00 unit Kitchen Sink 2,100,000 M.42
1.00 Ls Perlengkapan Umum 250,000 A.4
AK-I.2016.(11) U-138 unit Pekerjaan Pasangan Pompa Air 957,700 0.6 .
1.00 Unit Pompa Air 800,000 M.132
0.40 Ls Perlengkapan Umum 100,000 A.4
0.40 Oh Pekerja 34,000 L.1
0.20 Oh Tukang Pipa 20,000 L.8
0.02 Oh Mandor 3,700 L.10
AK-I.2016.(24) U-139 unit Pekerjaan Pasangan Air Conditioner 4,812,190 0.1 .
1.00 unit Air Conditioner 4,800,000 M.127
0.03 Ls Perlengkapan Umum 6,250 A.4
0.04 Oh Pekerja 3,570 L.1
0.02 Oh Tukang Listrik 2,000 L.7

Software RAB Exarch xPro 36/396


0.00 Oh Mandor 370 L.10
AK-I.2016.(25) U-140 unit Pekerjaan Pasangan Exhaust Fan 312,190 0.1 .
1.00 unit Exhaust Fan 300,000 M.128
0.03 Ls Perlengkapan Umum 6,250 A.4
0.04 Oh Pekerja 3,570 L.1
0.02 Oh Tukang Listrik 2,000 L.7
0.00 Oh Mandor 370 L.10
SATUAN PEKERJAAN LAINNYA .
A.2.2.1.9.a U-141 1.00 m2 Pembersihan Area Kerja Pasca Konstruksi 26,100 0.3 .
0.25 OH Pekerja 21,250 L.1
0.02 OH Kepala Tukang 3,000 L.9
0.01 OH Mandor 1,850 L.10
AK-I.2016.(30) U-142 pohon Pekerjaan Menanam Pohon Perdu 560,350 0.5 .
1.00 unit Pohon Perdu 500,000 M.142
0.04 Ls Perlengkapan Umum 10,000 A.4
0.20 oh Pekerja 17,000 L.1
0.30 oh Tukang Batu 30,000 L.3
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 1,850 L.10
A.4.4.3.58. U-143 1.00 m2 Pemasangan dinding batu tempel hitam 333,925 1.1 .
0.70 OH Pekerja 59,500 L.1
0.35 OH Tukang Batu 35,000 L.3
0.04 OH Kepala tukang 5,250 L.9
0.04 OH Mandor 6,475 L.10
1.10 m2 Batu alam / tempel 203,500 M.4
11.75 Kg Semen 15,275 M.12
0.04 M3 Pasir Pasang 8,925 M.9
U-144 m1 Pek.Pembuatan Railing Stainless Steel, tinggi 1,2 m 643,933 0.6 .
2.64 m1 Hollow SS 40x40 220,000 M.30
4.00 m1 Hollow SS 20x40 233,333 M.29
1.10 m1 Pipa SS Dia.2" 90,750 M.32
0.20 kg Kawat las listrik 27,000 M.137
0.10 jam Sewa alat las 15,000 A.6
0.20 oh Pekerja 17,000 L.1
0.35 oh Tukang Besi 35,000 L.4
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 1,850 L.10
0.01 Ls Perlengkapan Umum 2,500 A.4
U-145 1.00 m2 Analisa Satuan Pekerjaan Baja Ringan 208,163 0.8 .
2.80 m1 Baja Ringan-C Truss 37,333 M.36
5.10 m1 Baja Ringan-Reng Truss 34,000 M.35
25.00 bh Truss Screw 18,750 M.114
35.00 bh Roof Bottom Screw 19,250 M.115
1.00 bh Baut Ramset / Dina Bolt 15,000 M.109
0.26 OH Pekerja 21,760 L.1
0.25 OH Tukang Atap 24,700 L.2
0.18 OH Tukang Besi 17,600 L.4
0.12 OH Kepala Tukang 17,550 L.9
0.01 OH Mandor 2,220 L.10
U-146 1.00 m2 Pasang Kuda-kuda baja ringan + reng untuk atap asbes/ 194,450 0.7 .
3.72 m' Baja Ringan-C Truss 49,600 M.36
28.00 bh Truss Screw 21,000 M.114
1.60 bh Baut Ramset / Dina Bolt 24,000 M.109
3.60 m' Baja Ringan-Reng Truss 24,000 M.35
0.12 m' Talang Jurai 3,100 M.39
0.20 Oh Pekerja 17,000 L.1
0.45 Oh Tukang Besi 45,000 L.4
0.01 Oh Kepala Tukang 1,500 L.9
0.05 Oh Mandor 9,250 L.10
U-147 1.00 m2 Pasang Kuda-kuda baja ringan + reng untuk atap genteng 213,950 0.7 .
3.72 m' Baja Ringan-C Truss 49,600 M.36
38.00 bh Truss Screw 28,500 M.114

Software RAB Exarch xPro 37/396


1.60 bh Baut Ramset / Dina Bolt 24,000 M.109
5.40 m' Baja Ringan-Reng Truss 36,000 M.35
0.12 m' Talang Jurai 3,100 M.39
0.20 Oh Pekerja 17,000 L.1
0.45 Oh Tukang Besi 45,000 L.4
0.01 Oh Kepala Tukang 1,500 L.9
0.05 Oh Mandor 9,250 L.10
U-148 1.00 m2 1m2-Pasang Atap Spandek Zincalume 100,410 0.1 .
1.10 m2 Atap Spandek 82,500 M.34
6.00 bh Truss Screw 4,500 M.114
2.00 bh Roof Bottom Screw 1,100 M.115
0.02 oh Pekerja 1,700 L.1
0.08 oh Tukang Atap 8,000 L.2
0.01 oh Kepala tukang 1,500 L.9
0.01 oh Mandor 1,110 L.10
U-149 1.00 m2 Pasang Nok Zincalume 48,610 0.1 .
1.10 m2 Nok Zincalume 33,000 M.38
6.00 bh Roof Bottom Screw 3,300 M.115
0.02 oh Pekerja 1,700 L.1
0.08 oh Tukang Atap 8,000 L.2
0.01 oh Kepala tukang 1,500 L.9
0.01 oh Mandor 1,110 L.10

DAFTAR ANALISA UTAMA


Analisa Harga Satuan Pekerjaan Sesuai Acuan PUPERA Tahun 2016 Bidang IV CIPTA KARYA
A.2.2.1.1. P-001 1.00 m2 (K3) Pembuatan pagar sementara dari kayu tinggi 2 mete 272,149 0.6 .
0.40 OH Pekerja 34,000 L.1
0.20 OH Tukang Kayu 20,000 L.6
0.02 OH Kepala Tukang 3,000 L.9
0.02 OH Mandor 3,700 L.10
1.25 btg Dolken kayu Ø 8-10/400 cm 31,250 M.104
5.00 Kg Semen 6,500 M.12
0.01 m3 Pasir beton 1,250 M.8
0.01 m3 Koral beton 1,949 M.1018
0.07 m3 Kayu balok 5/7 Kelas II 165,600 M.1066
0.06 Kg Paku Biasa 2" - 5" 1,500 M.111
0.40 Ltr Residu 3,400 M.1499
A.2.2.1.2 P-002 1.00 m2 (K3) Pembuatan pagar sementara dari seng gelombang tin 365,999 0.6 .
0.20 OH Pekerja 17,000 L.1
0.40 OH Tukang Kayu 40,000 L.6
0.02 OH Kepala Tukang 3,000 L.9
0.02 OH Mandor 3,700 L.10
1.25 btg Dolken kayu Ø 8-10/400 cm 31,250 M.104
2.50 Kg Semen 3,250 M.12
1.20 Lbr Seng Gelombang 3" x 6" BJLS 28 84,000 M.61
0.01 m3 Pasir beton 1,250 M.8
0.01 m3 Koral beton 1,949 M.1018
0.07 m3 Kayu balok 5/7 Kelas II 165,600 M.1066
0.06 Kg Paku Biasa 2" - 5" 1,500 M.111
0.45 Ltr Meni besi 13,500 M.1342
A.2.2.1.3. P-003 1.00 m2 Pembuatan pagar sementara dari kawat duri tinggi 1,8 m 1,460,999 0.5 .
0.20 OH Pekerja 17,000 L.1
0.30 OH Tukang Kayu 30,000 L.6
0.02 OH Kepala Tukang 3,000 L.9
0.02 OH Mandor 3,700 L.10
1.00 btg Dolken kayu Ø 8-10/400 cm 25,000 M.104
2.00 Kg Semen 2,600 M.12
25.00 M’ Kawat duri 1,375,000 M.1122
0.01 m3 Pasir beton 1,250 M.8
0.01 m3 Koral beton 1,949 M.1018

Software RAB Exarch xPro 38/396


0.06 Kg Paku Biasa 2" - 5" 1,500 M.111
A.2.2.1.4. P-004 1.00 m1 Pengukuran dan pemasangan Bouwplank 73,525 0.2 .
0.10 OH Pekerja 8,500 L.1
0.10 OH Tukang Kayu 10,000 L.6
0.01 OH Kepala Tukang 1,500 L.9
0.01 OH Mandor 925 L.10
0.01 m3 Kayu balok 5/7 Kelas II 27,600 M.1066
0.02 Kg Paku Biasa 2" - 5" 500 M.111
0.01 m3 Kayu papan 3/20 24,500 M.1084
A.2.2.1.5. P-005 1.00 m2 (K3) Pembuatan kantor sementara lantai plesteran 1,202,075 5.4 .
2.00 OH Pekerja 170,000 L.1
2.00 OH Tukang Kayu 200,000 L.6
1.00 OH Tukang batu 100,000 L.3
0.30 OH Kepala Tukang 45,000 L.9
0.05 OH Mandor 9,250 L.10
1.25 btg Dolken kayu Ø 8-10/400 cm 31,250 M.104
0.18 m3 Kayu balok 5/7 Kelas II 414,000 M.1066
0.08 Kg Paku Biasa 2" - 5" 2,000 M.111
1.10 Kg Baja strip (0,2 x 2) cm 13,750 M.15
35.00 Kg Semen 45,500 M.12
0.15 m3 Pasir pasang 38,250 M.9
0.10 m3 Pasir beton 25,000 M.8
0.15 m3 Koral beton 32,475 M.1018
30.00 Bh Bata merah 19,500 M.2
0.25 Lbr Seng Gelombang 3" x 6" BJLS 28 17,500 M.61
0.20 Bh Jendela naco 4,900 M.1514
0.08 m2 Kaca polos 8,800 M.1467
0.15 Bh Kunci tanam biasa 19,500 M.1520
0.06 Lbr Plywood 120x240 tbl. 4 mm 5,400 M.58
A.2.2.1.6. P-006 1.00 m2 (K3) Pembuatan rumah jaga (konstruksi kayu ) 1,361,250 2.7 .
1.00 OH Pekerja 85,000 L.1
1.50 OH Tukang Kayu 150,000 L.6
0.15 OH Kepala tukang 22,500 L.9
0.05 OH Mandor 9,250 L.10
3.00 btg Dolken kayu Ø 8-10/400 cm 75,000 M.104
0.28 m3 Papan kayu 3/20 Kelas II 897,000 M.1089
0.70 Kg Paku Biasa 2" - 5" 17,500 M.111
1.50 Lbr Seng Gelombang 3" x 6" BJLS 28 105,000 M.61
A.2.2.1.7. P-007 1.00 m2 (K3) Pembuatan gudang semen dan bahan 1,211,225 3.3 .
1.00 OH Pekerja 85,000 L.1
2.00 OH Tukang Kayu 200,000 L.6
0.20 OH Kepala Tukang 30,000 L.9
0.05 OH Mandor 9,250 L.10
1.70 btg Dolken kayu Ø 8-10/400 cm 42,500 M.104
0.21 m3 Papan kayu 3/20 Kelas II 682,500 M.1089
0.30 Kg Paku Biasa 2" - 5" 7,500 M.111
10.50 Kg Semen 13,650 M.12
0.03 m3 Pasir beton 7,500 M.8
0.05 m3 Koral beton 10,825 M.1018
1.50 Lbr Seng Gelombang 3" x 6" BJLS 28 105,000 M.61
0.25 Lbr Seng Gelombang 3" x 6" BJLS 28 17,500 M.61
A.2.2.1.8. P-008 1.00 m2 (K3) Pembuatan bedeng pekerja 1,235,725 3.3 .
1.00 OH Pekerja 85,000 L.1
2.00 OH Tukang Kayu 200,000 L.6
0.20 OH Kepala Tukang 30,000 L.9
0.05 OH Mandor 9,250 L.10
1.25 btg Dolken kayu Ø 8-10/400 cm 31,250 M.104
0.19 m3 Papan kayu 3/20 Kelas II 604,500 M.1089
0.30 Kg Paku Biasa 2" - 5" 7,500 M.111
18.00 Kg Semen 23,400 M.12
0.03 m3 Pasir beton 7,500 M.8
0.05 m3 Koral beton 10,825 M.1018

Software RAB Exarch xPro 39/396


1.50 Lbr Seng Gelombang 3" x 6" BJLS 28 105,000 M.61
1.35 Lbr Plywood 120x240 tbl. 4 mm 121,500 M.58
A.2.2.1.9. P-009 1.00 m2 (K3) Pembersihan lapangan dan perataan 17,750 0.2 .
0.10 OH Pekerja 8,500 L.1
0.05 OH Mandor 9,250 L.10
A.2.2.1.10. P-010 1.00 m2 (K3) Pembuatan steger/perancah dari bambu 351,102 3.3 .
1.00 OH Pekerja 85,000 L.1
2.00 OH Tukang Kayu 200,000 L.6
0.20 OH Kepala Tukang 30,000 L.9
0.05 OH Mandor 9,250 L.10
1.25 btg Bambu Ø 6 - 8 / 600 cm 22,500 M.103
0.19 Kg Tali ijuk 4,352 M.1538
A.2.2.1.11. P-011 1.00 m2 Pembuatan kotak adukan ukuran 40cm x50cm x25cm 170,600 0.3 .
0.30 OH Tukang Kayu 30,000 L.6
0.03 OH Kepala Tukang 4,500 L.9
0.04 m3 Kayu papan kelas III 90,000 M.1087
0.02 m3 Kayu balok 5/7 kelas III 44,100 M.1067
0.08 kg Paku Biasa 2" - 5" 2,000 M.111
A.2.2.1.12. P-012 1.00 m2 Pembuatan jalan sementara 157,475 1.0 .
1.00 OH Pekerja 85,000 L.1
0.01 OH Mandor 925 L.10
0.15 m3 Batu belah 37,500 M.5
0.09 m3 Batu pecah 2/3 31,500 M.1011
0.01 m3 Pasir pasang 2,550 M.9
A.2.2.1.13. P-013 1.00 m2 Pembongkaran beton bertulang 236,549 2.0 .
1.33 OH Pekerja 113,339 L.1
0.67 OH Mandor 123,210 L.10
A.2.2.1.14. P-014 1.00 m3 Pembongkaran dinding tembok bata 118,275 1.0 .
0.67 OH Pekerja 56,670 L.1
0.33 OH Mandor 61,605 L.10
A.2.2.1.15. P-015 1.00 m2 Pemasangan pagar kawat jaring galvanis panjang 240 cm 27,814 0.1 .
0.04 OH Pekerja 3,570 L.1
0.00 OH Tukang Besi 400 L.4
0.00 OH Kepala Tukang 300 L.9
0.04 OH Mandor 7,770 L.10
0.14 Lbr Kawat jaring 15,774 M.1124
A.2.2.1.16. P-016 1.00 m2 Pemasangan panel beton pracetak 5x50x240 cm 412,039 0.5 .
0.38 OH Pekerja 31,875 L.1
0.13 OH Tukang Batu 12,500 L.3
0.01 OH Kepala Tukang 1,800 L.9
0.02 OH Mandor 3,515 L.10
0.99 Lbr Panel Beton Pracetak 147,900 M.1482
0.53 btg Kolom beton pracetak 105,840 M.1481
45.00 Kg Semen 58,500 M.12
0.07 m3 Pasir beton 18,500 M.8
0.15 m3 Koral beton 31,609 M.1018
A.2.3.1.1. P-017 1.00 m3 Penggalian tanah biasa sedalam 1 m 68,375 0.8 .
0.75 OH Pekerja 63,750 L.1
0.03 OH Mandor 4,625 L.10
A.2.3.1.2. P-018 1.00 m3 Penggalian tanah biasa sedalam 2 m 84,825 0.9 .
0.90 OH Pekerja 76,500 L.1
0.05 OH Mandor 8,325 L.10
A.2.3.1.3. P-019 1.00 m3 Menggali tanah biasa sedalam 3 m 101,645 1.1 .
1.05 OH Pekerja 89,250 L.1
0.07 OH Mandor 12,395 L.10
A.2.3.1.4. P-020 1.00 m3 Menggali tanah keras sedalam 1 m 90,920 1.0 .
1.00 OH Pekerja 85,000 L.1
0.03 OH Mandor 5,920 L.10
A.2.3.1.5. P-021 1.00 m3 Menggali tanah cadas sedalam 1 m 138,600 1.6 .
1.50 OH Pekerja 127,500 L.1
0.06 OH Mandor 11,100 L.10
A.2.3.1.6. P-022 1.00 m3 Menggali tanah lumpur sedalam 1 m 110,325 1.2 .

Software RAB Exarch xPro 40/396


1.20 OH Pekerja 102,000 L.1
0.05 OH Mandor 8,325 L.10
A.2.3.1.7. P-023 1.00 m2 Pengerjaan stripping tanah tebing setinggi 1 meter 5,175 0.1 .
0.05 OH Pekerja 4,250 L.1
0.01 OH Mandor 925 L.10
A.2.3.1.8. P-024 1.00 m3 (K3) Pembuangan tanah sejauh 30 meter 29,900 0.3 .
0.33 OH Pekerja 28,050 L.1
0.01 OH Mandor 1,850 L.10
A.2.3.1.9. P-025 1.00 m3 Pengurugan kembali galian tanah Tanah Biasa Sedalam 25,875 0.3 .
0.25 OH Pekerja 21,250 L.1
0.03 OH Mandor 4,625 L.10
A.2.3.1.10. P-026 1.00 m3 (K3) Pemadatan tanah tanah ( per 20 cm) 51,750 0.6 .
0.50 OH Pekerja 42,500 L.1
0.05 OH Mandor 9,250 L.10
A.2.3.1.11. P-027 1.00 m3 Pengurugan dengan pasir urug 267,350 0.3 .
0.30 OH Pekerja 25,500 L.1
0.01 OH Mandor 1,850 L.10
1.20 M3 Pasir urug 240,000 M.10
A.2.3.1.12. P-028 1.00 m3 Pemasangan lapisan pudel campuran 1KP:3PP:7TL 406,692 1.3 .
0.80 OH Pekerja 68,000 L.1
0.40 OH Tukang Batu 40,000 L.3
0.04 OH Kepala Tukang 6,000 L.9
0.08 OH Mandor 14,800 L.10
0.14 m3 Kapur 47,723 M.1013
0.40 m3 Pasir Pasang 102,000 M.9
0.95 m3 Tanah Liat 128,170 M.1025
A.2.3.1.13. P-029 1.00 m3 Pemasangan lapisan ijuk tebal 10 cm untuk bidang resap 1,275,525 0.2 .
0.15 OH Pekerja 12,750 L.1
0.02 OH Mandor 2,775 L.10
6.00 m3 Ijuk 1,260,000 M.6
A.2.3.1.14. P-030 1.00 m3 Pengurugan sirtu padat 312,675 0.3 .
0.25 OH Pekerja 21,250 L.1
0.03 OH Mandor 4,625 L.10
1.20 m3 Sirtu 286,800 M.1024
A.3.2.1.1. P-031 1.00 m3 Pemasangan pondasi batu belah campuran 1SP : 3PP 913,900 2.4 .
1.50 OH Pekerja 127,500 L.1
0.75 OH Tukang Batu 75,000 L.3
0.08 OH Kepala Tukang 11,250 L.9
0.08 OH Mandor 13,875 L.10
1.20 m3 Batu belah 300,000 M.5
202.00 Kg Semen 262,600 M.12
0.49 m3 Pasir Pasang 123,675 M.9
A.3.2.1.2. P-032 1.00 m3 Pemasangan pondasi batu belah campuran 1SP : 4PP 872,125 2.4 .
1.50 OH Pekerja 127,500 L.1
0.75 OH Tukang Batu 75,000 L.3
0.08 OH Kepala Tukang 11,250 L.9
0.08 OH Mandor 13,875 L.10
1.20 m3 Batu belah 300,000 M.5
163.00 Kg Semen 211,900 M.12
0.52 m3 Pasir Pasang 132,600 M.9
A.3.2.1.3. P-033 1.00 m3 Pemasangan pondasi batu belah campuran 1SP : 5PP 843,145 2.4 .
1.50 OH Pekerja 127,500 L.1
0.75 OH Tukang Batu 75,000 L.3
0.08 OH Kepala Tukang 11,250 L.9
0.08 OH Mandor 13,875 L.10
1.20 m3 Batu belah 300,000 M.5
136.00 Kg Semen 176,800 M.12
0.54 m3 Pasir Pasang 138,720 M.9
A.3.2.1.4. P-034 1.00 m3 Pemasangan pondasi batu belah campuran 1SP : 6PP 822,780 2.4 .
1.50 OH Pekerja 127,500 L.1
0.75 OH Tukang Batu 75,000 L.3
0.08 OH Kepala Tukang 11,250 L.9

Software RAB Exarch xPro 41/396


0.08 OH Mandor 13,875 L.10
1.20 m3 Batu belah 300,000 M.5
117.00 Kg Semen 152,100 M.12
0.56 m3 Pasir Pasang 143,055 M.9
A.3.2.1.5. P-035 1.00 m3 Pemasangan pondasi batu belah campuran 1SP : 8PP 794,845 2.4 .
1.50 OH Pekerja 127,500 L.1
0.75 OH Tukang Batu 75,000 L.3
0.08 OH Kepala Tukang 11,250 L.9
0.08 OH Mandor 13,875 L.10
1.20 m3 Batu belah 300,000 M.5
91.00 Kg Semen 118,300 M.12
0.58 m3 Pasir Pasang 148,920 M.9
A.3.2.1.6. P-036 1.00 m3 Pemasangan pondasi batu belah campuran 1SP : 1KP : 895,420 2.4 .
1.50 OH Pekerja 127,500 L.1
0.75 OH Tukang Batu 75,000 L.3
0.08 OH Kepala Tukang 11,250 L.9
0.08 OH Mandor 13,875 L.10
1.20 m3 Batu belah 300,000 M.5
0.17 m3 Kapur 60,095 M.1013
170.00 Kg Semen 221,000 M.12
0.34 m3 Pasir Pasang 86,700 M.9
A.3.2.1.7. P-037 1.00 m3 Pemasangan pondasi batu belah campuran 1 SP : 3 KP : 784,350 2.4 .
1.50 OH Pekerja 127,500 L.1
0.75 OH Tukang Batu 75,000 L.3
0.08 OH Kepala Tukang 11,250 L.9
0.08 OH Mandor 13,875 L.10
1.20 m3 Batu belah 300,000 M.5
61.00 Kg Semen 79,300 M.12
0.15 m3 Kapur 51,965 M.1013
0.49 m3 Pasir Pasang 125,460 M.9
A.3.2.1.8. P-038 1.00 m3 Pemasangan pondasi batu belah campuran ¼ SP : 1 KP : 760,599 2.4 .
1.50 OH Pekerja 127,500 L.1
0.75 OH Tukang Batu 75,000 L.3
0.08 OH Kepala Tukang 11,250 L.9
0.08 OH Mandor 13,875 L.10
1.20 m3 Batu belah 300,000 M.5
41.00 Kg Semen 53,300 M.12
0.13 m3 Kapur 46,309 M.1013
0.52 m3 Pasir Pasang 133,365 M.9
A.3.2.1.9. P-039 1.00 m3 Pemasangan batu kosong (anstamping) 504,765 1.2 .
0.78 OH Pekerja 66,300 L.1
0.39 OH Tukang Batu 39,000 L.3
0.04 OH Kepala Tukang 5,850 L.9
0.04 OH Mandor 7,215 L.10
1.20 m3 Batu belah 300,000 M.5
0.43 m3 Pasir urug 86,400 M.10
A.3.2.1.10. P-040 1.00 m3 (K3) Pemasangan pondasi siklop, 60% beton campuran 2,273,660 4.5 .
3.40 OH Pekerja 289,000 L.1
0.85 OH Tukang Batu 85,000 L.3
0.09 OH Kepala Tukang 12,750 L.9
0.17 OH Mandor 31,450 L.10
0.48 m3 Batu belah 120,000 M.5
194.00 Kg Semen 252,200 M.12
0.31 m3 Pasir Beton 78,000 M.8
0.47 m3 Kerikil 102,960 M.7
126.00 Kg Besi beton 1,260,000 M.16
1.80 Kg Kawat beton 42,300 M.27
A.3.2.1.11. P-041 1.00 m3 Pemasangan pondasi sumuran, diameter 100 cm 863,675 3.4 .
2.40 OH Pekerja 204,000 L.1
0.80 OH Tukang Batu 80,000 L.3
0.08 OH Kepala Tukang 12,000 L.9
0.12 OH Mandor 22,015 L.10

Software RAB Exarch xPro 42/396


0.45 m3 Batu belah 112,500 M.5
194.00 Kg Semen 252,200 M.12
0.31 m3 Pasir Beton 78,000 M.8
0.47 m3 Kerikil 102,960 M.7
A.4.1.1.1 P-042 1.00 m3 Membuat beton mutu f’c = 7,4 MPa (K 100) 886,255 2.0 .
1.65 OH Pekerja 140,250 L.1
0.28 OH Tukang Batu 27,500 L.3
0.03 OH Kepala Tukang 4,200 L.9
0.08 OH Mandor 15,355 L.10
247.00 kg Semen 321,100 M.12
869.00 kg Pasir Beton (kg) 217,250 M.1020
999.00 kg Kerikil (kg) 149,850 M.1017
215.00 Ltr Air 10,750 M.1
A.4.1.1.2 P-043 1.00 m3 Membuat beton mutu f’= 9,8 MPa (K 125) 915,655 2.0 .
1.65 OH Pekerja 140,250 L.1
0.28 OH Tukang Batu 27,500 L.3
0.03 OH Kepala Tukang 4,200 L.9
0.08 OH Mandor 15,355 L.10
276.00 kg Semen 358,800 M.12
828.00 kg Pasir Beton (kg) 207,000 M.1020
1012.00 kg Kerikil (kg) 151,800 M.1017
215.00 Ltr Air 10,750 M.1
A.4.1.1.3 P-044 1.00 m3 Membuat beton mutu f’= 12,2 MPa (K 150) 939,055 2.0 .
1.65 OH Pekerja 140,250 L.1
0.28 OH Tukang Batu 27,500 L.3
0.03 OH Kepala Tukang 4,200 L.9
0.08 OH Mandor 15,355 L.10
299.00 kg Semen 388,700 M.12
799.00 kg Pasir Beton (kg) 199,750 M.1020
1017.00 kg Kerikil (kg) 152,550 M.1017
215.00 Ltr Air 10,750 M.1
A.4.1.1.4 P-045 1.00 m3 Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), 822,400 1.5 .
1.20 OH Pekerja 102,000 L.1
0.20 OH Tukang Batu 20,000 L.3
0.02 OH Kepala Tukang 3,000 L.9
0.06 OH Mandor 11,100 L.10
230.00 kg Semen 299,000 M.12
893.00 kg Pasir Beton (kg) 223,250 M.1020
1027.00 kg Kerikil (kg) 154,050 M.1017
200.00 Ltr Air 10,000 M.1
A.4.1.1.5. P-046 1.00 m3 Membuat beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2 966,205 2.0 .
1.65 OH Pekerja 140,250 L.1
0.28 OH Tukang Batu 27,500 L.3
0.03 OH Kepala Tukang 4,200 L.9
0.08 OH Mandor 15,355 L.10
326.00 kg Semen 423,800 M.12
760.00 kg Pasir Beton (kg) 190,000 M.1020
1029.00 kg Kerikil (kg) 154,350 M.1017
215.00 Ltr Air 10,750 M.1
A.4.1.1.6 P-047 1.00 m3 Membuat beton mutu f’= 16,9 MPa (K 200), slump (120 ± 993,055 2.0 .
1.65 OH Pekerja 140,250 L.1
0.28 OH Tukang Batu 27,500 L.3
0.03 OH Kepala Tukang 4,200 L.9
0.08 OH Mandor 15,355 L.10
352.00 kg Semen 457,600 M.12
731.00 kg Pasir Beton (kg) 182,750 M.1020
1031.00 kg Kerikil (kg) 154,650 M.1017
215.00 Ltr Air 10,750 M.1
A.4.1.1.7. P-048 1.00 m3 Membuat beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 1,011,905 2.0 .
1.65 OH Pekerja 140,250 L.1
0.28 OH Tukang Batu 27,500 L.3
0.03 OH Kepala Tukang 4,200 L.9

Software RAB Exarch xPro 43/396


0.08 OH Mandor 15,355 L.10
371.00 kg Semen 482,300 M.12
698.00 kg Pasir Beton (kg) 174,500 M.1020
1047.00 kg Kerikil (kg) 157,050 M.1017
215.00 Ltr Air 10,750 M.1
A.4.1.1.8. P-049 1.00 m3 Membuat beton mutu f’= 21,7 MPa (K 250), slump (120 ± 1,026,105 2.0 .
1.65 OH Pekerja 140,250 L.1
0.28 OH Tukang Batu 27,500 L.3
0.03 OH Kepala Tukang 4,200 L.9
0.08 OH Mandor 15,355 L.10
384.00 kg Semen 499,200 M.12
692.00 kg Pasir Beton (kg) 173,000 M.1020
1039.00 kg Kerikil (kg) 155,850 M.1017
215.00 Ltr Air 10,750 M.1
A.4.1.1.9. P-050 1.00 m3 Membuat beton mutu f’ = 24,0 MPa (K 275), slump (120 ± 1,050,755 2.0 .
1.65 OH Pekerja 140,250 L.1
0.28 OH Tukang Batu 27,500 L.3
0.03 OH Kepala Tukang 4,200 L.9
0.08 OH Mandor 15,355 L.10
406.00 kg Semen 527,800 M.12
684.00 kg Pasir Beton (kg) 171,000 M.1020
1026.00 kg Kerikil (kg) 153,900 M.1017
215.00 Ltr Air 10,750 M.1
A.4.1.1.10. P-051 1.00 m3 Membuat beton mutu f’c = 26,4 MPa (K 300), slump (120 1,058,355 2.0 .
1.65 OH Pekerja 140,250 L.1
0.28 OH Tukang Batu 27,500 L.3
0.03 OH Kepala Tukang 4,200 L.9
0.08 OH Mandor 15,355 L.10
413.00 kg Semen 536,900 M.12
681.00 kg Pasir Beton (kg) 170,250 M.1020
1021.00 kg Kerikil (kg) 153,150 M.1017
215.00 Ltr Air 10,750 M.1
A.4.1.1.11. P-052 1.00 m3 Membuat beton mutu f’c = 28,8 MPa (K 325), slump (120 1,138,025 2.6 .
2.10 OH Pekerja 178,500 L.1
0.35 OH Tukang Batu 35,000 L.3
0.04 OH Kepala Tukang 5,250 L.9
0.11 OH Mandor 19,425 L.10
439.00 kg Semen 570,700 M.12
670.00 kg Pasir Beton (kg) 167,500 M.1020
1006.00 kg Kerikil (kg) 150,900 M.1017
215.00 Ltr Air 10,750 M.1
A.4.1.1.12. P-053 1.00 m3 Membuat beton mutu f’c = 31,2 MPa (K 350), slump (120 1,148,075 2.6 .
2.10 OH Pekerja 178,500 L.1
0.35 OH Tukang Batu 35,000 L.3
0.04 OH Kepala Tukang 5,250 L.9
0.11 OH Mandor 19,425 L.10
448.00 kg Semen 582,400 M.12
667.00 kg Pasir Beton (kg) 166,750 M.1020
1000.00 kg Kerikil (kg) 150,000 M.1017
215.00 Ltr Air 10,750 M.1
A.4.1.1.12. P-053a 1.00 m3 Membuat beton mutu f’c = 31,2 MPa (K 350), campuran 1,348,325 2.6 .
2.10 OH Pekerja 178,500 L.1
0.35 OH Tukang Batu 35,000 L.3
0.04 OH Kepala Tukang 5,250 L.9
0.11 OH Mandor 19,425 L.10
448.00 kg Semen 582,400 M.12
667.00 kg Pasir Beton (kg) 166,750 M.1020
1000.00 kg Kerikil (kg) 150,000 M.1017
4.50 Ltr Bahan Kimia 200,250 M.1490
215.00 Ltr Air 10,750 M.1
A.4.1.1.13 P-054 1.00 m3 Membuat beton kedap air dengan strorox - 100 1,105,175 2.6 .
2.10 OH Pekerja 178,500 L.1

Software RAB Exarch xPro 44/396


0.35 OH Tukang Batu 35,000 L.3
0.04 OH Kepala Tukang 5,250 L.9
0.11 OH Mandor 19,425 L.10
400.00 kg Semen 520,000 M.12
0.48 m3 Pasir Beton 120,000 M.8
0.80 m3 Kerikil 176,000 M.7
1.20 kg Strorox - 100 51,000 M.1537
A.4.1.1.14 P-055 1.00 m1 Pemasangan PVC Waterstop lebar 150 mm 91,005 0.1 .
0.06 OH Pekerja 5,100 L.1
0.03 OH Tukang Pipa 3,000 L.8
0.00 OH Kepala Tukang 450 L.9
0.00 OH Mandor 555 L.10
1.05 m Waterstop lebar 150 mm 81,900 M.1541
A.4.1.1.15 P-056 1.00 m1 Pemasangan PVC Waterstop lebar 200 mm 95,345 0.1 .
0.07 OH Pekerja 5,950 L.1
0.04 OH Tukang Pipa 3,500 L.8
0.00 OH Kepala Tukang 600 L.9
0.01 OH Mandor 1,295 L.10
1.05 m Waterstop lebar 200 mm 84,000 M.1542
A.4.1.1.16 P-057 1.00 m1 Membuat PVC Waterstop lebar 230 mm - 320 mm 111,890 0.1 .
0.08 OH Pekerja 6,800 L.1
0.04 OH Tukang Batu 4,000 L.3
0.00 OH Kepala Tukang 600 L.9
0.00 OH Mandor 740 L.10
1.05 m Waterstop lebar 230 mm - 320 mm 99,750 M.1543
A.4.1.1.17 P-058 1.00 kg Pembesian dengan besi polos atau besi ulir 12,327 0.0 .
0.01 OH Pekerja 595 L.1
0.01 OH Tukang Besi 700 L.4
0.00 OH Kepala Tukang 105 L.9
0.00 OH Mandor 74 L.10
1.05 kg Besi beton 10,500 M.16
0.02 kg Kawat beton 353 M.27
A.4.1.1.18 P-059 1.00 kg Pemasangan kabel presstressed polos/strands 11,791 0.0 .
0.01 OH Pekerja 425 L.1
0.01 OH Tukang Besi 500 L.4
0.00 OH Kepala Tukang 75 L.9
0.00 OH Mandor 56 L.10
1.05 kg Besi beton 10,500 M.16
0.01 kg Kawat beton 235 M.27
A.4.1.1.19 P-060 1.00 kg Pemasangan jaring kawat baja (wiremesh) 13,214 0.0 .
0.00 OH Pekerja 213 L.1
0.00 OH Tukang Besi 250 L.4
0.00 OH Kepala Tukang 375 L.9
0.00 OH Mandor 19 L.10
1.02 kg Jaring kawat baja dilas 12,240 M.1528
0.01 kg Kawat beton 118 M.27
A.4.1.1.20 P-061 1.00 m2 (K3) Pemasangan bekisting untuk pondasi 162,985 0.8 .
0.52 OH Pekerja 44,200 L.1
0.26 OH Tukang Kayu 26,000 L.6
0.03 OH Kepala Tukang 3,900 L.9
0.03 OH Mandor 4,810 L.10
0.04 m3 Papan kayu 3/20 Kelas III 72,000 M.1090
0.30 kg Paku Biasa 2" - 5" 7,500 M.111
0.10 Ltr Minyak bekisting 4,575 M.141
A.4.1.1.21 P-062 1.00 m2 (K3) Pemasangan bekisting untuk sloof 171,985 0.8 .
0.52 OH Pekerja 44,200 L.1
0.26 OH Tukang Kayu 26,000 L.6
0.03 OH Kepala Tukang 3,900 L.9
0.03 OH Mandor 4,810 L.10
0.05 m3 Papan kayu 3/20 Kelas III 81,000 M.1090
0.30 kg Paku Biasa 2" - 5" 7,500 M.111
0.10 Ltr Minyak bekisting 4,575 M.141

Software RAB Exarch xPro 45/396


A.4.1.1.22 P-063 1.00 m2 (K3) Pemasangan bekisting untuk kolom 355,055 1.1 .
0.66 OH Pekerja 56,100 L.1
0.33 OH Tukang Kayu 33,000 L.6
0.03 OH Kepala Tukang 4,950 L.9
0.03 OH Mandor 6,105 L.10
0.04 m3 Papan kayu 3/20 Kelas III 72,000 M.1090
0.40 kg Paku Biasa 2" - 5" 10,000 M.111
0.20 Ltr Minyak bekisting 9,150 M.141
0.02 m3 Balok kayu kelas II 52,500 M.1062
0.35 Lbr Plywood 120x240 tbl. 9 mm 61,250 M.60
2.00 btg Dolken kayu Ø 8-10/400 cm 50,000 M.104
A.4.1.1.23 P-064 1.00 m2 (K3) Pemasangan bekisting untuk balok 365,555 1.1 .
0.66 OH Pekerja 56,100 L.1
0.33 OH Tukang Kayu 33,000 L.6
0.03 OH Kepala Tukang 4,950 L.9
0.03 OH Mandor 6,105 L.10
0.04 m3 Papan kayu 3/20 Kelas III 72,000 M.1090
0.40 kg Paku Biasa 2" - 5" 10,000 M.111
0.20 Ltr Minyak bekisting 9,150 M.141
0.02 m3 Balok kayu kelas II 63,000 M.1062
0.35 Lbr Plywood 120x240 tbl. 9 mm 61,250 M.60
2.00 btg Dolken kayu Ø 8-10/400 cm 50,000 M.104
A.4.1.1.24 P-065 1.00 m2 (K3) Pemasangan bekisting untuk lantai 455,055 1.1 .
0.66 OH Pekerja 56,100 L.1
0.33 OH Tukang Kayu 33,000 L.6
0.03 OH Kepala Tukang 4,950 L.9
0.03 OH Mandor 6,105 L.10
0.04 m3 Papan kayu 3/20 Kelas III 72,000 M.1090
0.40 kg Paku Biasa 2" - 5" 10,000 M.111
0.20 Ltr Minyak bekisting 9,150 M.141
0.02 m3 Balok kayu kelas II 52,500 M.1062
0.35 Lbr Plywood 120x240 tbl. 9 mm 61,250 M.60
6.00 btg Dolken kayu Ø 8-10/400 cm 150,000 M.104
A.4.1.1.25 P-066 1.00 m2 (K3) Pemasangan bekisting untuk dinding 397,555 1.1 .
0.66 OH Pekerja 56,100 L.1
0.33 OH Tukang Kayu 33,000 L.6
0.03 OH Kepala Tukang 4,950 L.9
0.03 OH Mandor 6,105 L.10
0.03 m3 Papan kayu 3/20 Kelas III 54,000 M.1090
0.40 kg Paku Biasa 2" - 5" 10,000 M.111
0.20 Ltr Minyak bekisting 9,150 M.141
0.02 m3 Balok kayu kelas II 70,000 M.1062
0.35 Lbr Plywood 120x240 tbl. 9 mm 61,250 M.60
3.00 btg Dolken kayu Ø 8-10/400 cm 75,000 M.104
4.00 bh Penjaga jarak bekisting / spacer 18,000 A.11
A.4.1.1.26 P-067 1.00 m2 (K3) Pemasangan bekisting untuk tangga 334,768 1.1 .
0.66 OH Pekerja 56,100 L.1
0.33 OH Tukang Kayu 33,000 L.6
0.03 OH Kepala Tukang 4,950 L.9
0.03 OH Mandor 6,105 L.10
0.03 m3 Papan kayu 3/20 Kelas III 54,000 M.1090
0.40 kg Paku Biasa 2" - 5" 10,000 M.111
0.15 Ltr Minyak bekisting 6,863 M.141
0.02 m3 Balok kayu kelas II 52,500 M.1062
0.35 Lbr Plywood 120x240 tbl. 9 mm 61,250 M.60
2.00 btg Dolken kayu Ø 8-10/400 cm 50,000 M.104
A.4.1.1.27 P-068 1.00 m2 Pemasangan jembatan untuk pengecoran beton 113,480 0.2 .
0.15 OH Pekerja 12,750 L.1
0.05 OH Tukang Kayu 5,000 L.6
0.01 OH Kepala Tukang 750 L.9
0.01 OH Mandor 1,480 L.10
0.03 m3 Kayu kelas III (papan) 66,000 M.1081

Software RAB Exarch xPro 46/396


0.60 kg Paku Biasa 2" - 5" 15,000 M.111
0.50 btg Dolken kayu Ø 8-10/400 cm 12,500 M.104
A.4.1.1.28 P-069 1.00 m3 Membuat pondasi beton bertulang (150 kg besi + bekistin 3,595,000 8.5 .
5.30 OH Pekerja 450,500 L.1
0.28 OH Tukang batu 27,500 L.3
1.30 OH Tukang kayu 130,000 L.6
1.05 OH Tukang besi 105,000 L.4
0.26 OH Kepala tukang 39,300 L.9
0.27 OH Mandor 49,025 L.10
0.20 m3 Papan kayu 3/20 Kelas III 360,000 M.1090
1.50 kg Paku Biasa 2" - 5" 37,500 M.111
0.40 Ltr Minyak bekisting 18,300 M.141
157.50 kg Besi beton 1,575,000 M.16
2.25 kg Kawat beton 52,875 M.27
336.00 kg Semen 436,800 M.12
0.54 m3 Pasir Beton 135,000 M.8
0.81 m3 Kerikil 178,200 M.7
A.4.1.1.29 P-070 1.00 m3 Membuat sloof beton bertulang (200 kg besi + bekisting) 4,388,505 9.5 .
5.65 OH Pekerja 480,250 L.1
0.28 OH Tukang batu 27,500 L.3
1.56 OH Tukang kayu 156,000 L.6
1.40 OH Tukang besi 140,000 L.4
0.32 OH Kepala tukang 48,450 L.9
0.28 OH Mandor 52,355 L.10
0.27 m3 Papan kayu 3/20 Kelas III 486,000 M.1090
2.00 kg Paku Biasa 2" - 5" 50,000 M.111
0.60 Ltr Minyak bekisting 27,450 M.141
210.00 kg Besi beton 2,100,000 M.16
3.00 kg Kawat beton 70,500 M.27
336.00 kg Semen 436,800 M.12
0.54 m3 Pasir Beton 135,000 M.8
0.81 m3 Kerikil 178,200 M.7
A.4.1.1.30 P-071 1.00 m3 Membuat kolom beton bertulang (300 kg besi + bekisting) 7,607,255 11.8 .
7.05 OH Pekerja 599,250 L.1
0.28 OH Tukang batu 27,500 L.3
1.65 OH Tukang kayu 165,000 L.6
2.10 OH Tukang besi 210,000 L.4
0.40 OH Kepala tukang 60,450 L.9
0.35 OH Mandor 65,305 L.10
0.40 m3 Papan kayu 3/20 Kelas III 720,000 M.1090
4.00 kg Paku Biasa 2" - 5" 100,000 M.111
2.00 Ltr Minyak bekisting 91,500 M.141
315.00 kg Besi beton 3,150,000 M.16
4.50 kg Kawat beton 105,750 M.27
336.00 kg Semen 436,800 M.12
0.54 m3 Pasir Beton 135,000 M.8
0.81 m3 Kerikil 178,200 M.7
0.15 M3 Kayu kelas II balok 450,000 M.1074
3.50 Lbr Plywood 120x240 tbl. 9 mm 612,500 M.60
20.00 btg Dolken kayu Ø 8-10/400 cm 500,000 M.104
A.4.1.1.31 P-072 1.00 m3 Membuat balok beton bertulang (200 kg besi + bekisting) 5,940,730 10.3 .
6.35 OH Pekerja 539,750 L.1
0.28 OH Tukang batu 27,500 L.3
1.65 OH Tukang kayu 165,000 L.6
1.40 OH Tukang besi 140,000 L.4
0.33 OH Kepala tukang 49,950 L.9
0.32 OH Mandor 58,830 L.10
0.32 m3 Papan kayu 3/20 Kelas III 576,000 M.1090
3.20 kg Paku Biasa 2" - 5" 80,000 M.111
1.60 Ltr Minyak bekisting 73,200 M.141
210.00 kg Besi beton 2,100,000 M.16
3.00 kg Kawat beton 70,500 M.27

Software RAB Exarch xPro 47/396


336.00 kg Semen 436,800 M.12
0.54 m3 Pasir Beton 135,000 M.8
0.81 m3 Kerikil 178,200 M.7
0.14 m3 Kayu kelas II balok 420,000 M.1074
2.80 Lbr Plywood 120x240 tbl. 9 mm 490,000 M.60
16.00 btg Dolken kayu Ø 8-10/400 cm 400,000 M.104
A.4.1.1.32 P-073 1.00 m3 Membuat kolom beton bertulang (150 kg besi + bekisting) 5,558,850 8.5 .
5.30 OH Pekerja 450,500 L.1
0.28 OH Tukang batu 27,500 L.3
1.30 OH Tukang kayu 130,000 L.6
1.05 OH Tukang besi 105,000 L.4
0.27 OH Kepala tukang 39,750 L.9
0.27 OH Mandor 49,025 L.10
0.32 m3 Papan kayu 3/20 Kelas III 576,000 M.1090
3.20 kg Paku Biasa 2" - 5" 80,000 M.111
1.60 Ltr Minyak bekisting 73,200 M.141
157.50 kg Besi beton 1,575,000 M.16
2.25 kg Kawat beton 52,875 M.27
336.00 kg Semen 436,800 M.12
0.54 m3 Pasir Beton 135,000 M.8
0.81 m3 Kerikil 178,200 M.7
0.12 m3 Kayu kelas II balok 360,000 M.1074
2.80 Lbr Plywood 120x240 tbl. 9 mm 490,000 M.60
32.00 btg Dolken kayu Ø 8-10/400 cm 800,000 M.104
A.4.1.1.33 P-074 1.00 m3 Membuat dinding beton bertulang (150 kg besi + bekistin 4,928,950 3.7 .
0.53 OH Pekerja 45,050 L.1
0.28 OH Tukang batu 27,500 L.3
1.30 OH Tukang kayu 130,000 L.6
1.05 OH Tukang besi 105,000 L.4
0.26 OH Kepala tukang 39,300 L.9
0.27 OH Mandor 49,025 L.10
0.24 m3 Papan kayu 3/20 Kelas III 432,000 M.1090
3.20 kg Paku Biasa 2" - 5" 80,000 M.111
1.60 Ltr Minyak bekisting 73,200 M.141
157.50 kg Besi beton 1,575,000 M.16
2.25 kg Kawat beton 52,875 M.27
336.00 kg Semen 436,800 M.12
0.54 m3 Pasir Beton 135,000 M.8
0.81 m3 Kerikil 178,200 M.7
0.16 m3 Kayu kelas II balok 480,000 M.1074
2.80 Lbr Plywood 120x240 tbl. 9 mm 490,000 M.60
24.00 btg Dolken kayu Ø 8-10/400 cm 600,000 M.104
A.4.1.1.34 P-075 1.00 m3 Membuat dinding beton bertulang (200 kg besi + bekistin 5,507,455 9.5 .
5.65 OH Pekerja 480,250 L.1
0.28 OH Tukang batu 27,500 L.3
1.56 OH Tukang kayu 156,000 L.6
1.40 OH Tukang besi 140,000 L.4
0.32 OH Kepala tukang 48,450 L.9
0.28 OH Mandor 52,355 L.10
0.25 m3 Papan kayu 3/20 Kelas III 450,000 M.1090
3.00 kg Paku Biasa 2" - 5" 75,000 M.111
1.20 Ltr Minyak bekisting 54,900 M.141
210.00 kg Besi beton 2,100,000 M.16
3.00 kg Kawat beton 70,500 M.27
336.00 kg Semen 436,800 M.12
0.54 m3 Pasir Beton 135,000 M.8
0.81 m3 Kerikil 178,200 M.7
0.11 m3 Kayu kelas II balok 315,000 M.1074
2.50 Lbr Plywood 120x240 tbl. 9 mm 437,500 M.60
14.00 btg Dolken kayu Ø 8-10/400 cm 350,000 M.104
A.4.1.1.35 P-076 1.00 m1 Membuat kolom praktis beton bertulang (11 x 11) cm 131,870 0.3 .
0.18 OH Pekerja 15,300 L.1

Software RAB Exarch xPro 48/396


0.02 OH Tukang batu 2,000 L.3
0.02 OH Tukang kayu 2,000 L.6
0.02 OH Tukang besi 2,000 L.4
0.01 OH Kepala tukang 900 L.9
0.01 OH Mandor 1,665 L.10
0.00 m3 Papan kayu 3/20 Kelas III 3,600 M.1090
0.01 kg Paku Biasa 2" - 5" 250 M.111
1.20 Ltr Minyak bekisting 54,900 M.141
3.00 kg Besi beton 30,000 M.16
0.45 kg Kawat beton 10,575 M.27
4.00 kg Semen 5,200 M.12
0.01 m3 Pasir Beton 1,500 M.8
0.01 m3 Kerikil 1,980 M.7
A.4.1.1.36 P-077 1.00 m1 Membuat ring balok beton bertulang (10 x 15) cm 150,095 0.4 .
0.30 OH Pekerja 25,245 L.1
0.03 OH Tukang batu 3,300 L.3
0.03 OH Tukang kayu 3,300 L.6
0.03 OH Tukang besi 3,300 L.4
0.01 OH Kepala tukang 1,500 L.9
0.02 OH Mandor 2,775 L.10
0.00 m3 Papan kayu 3/20 Kelas III 5,400 M.1090
0.02 kg Paku Biasa 2" - 5" 500 M.111
1.20 Ltr Minyak bekisting 54,900 M.141
3.60 kg Besi beton 36,000 M.16
0.05 kg Kawat beton 1,175 M.27
5.50 kg Semen 7,150 M.12
0.01 m3 Pasir Beton 2,250 M.8
0.02 m3 Kerikil 3,300 M.7
A.4.1.2.1. P-078 1.00 m2 (K3) Pembuatan lahan produksi tebal 8cm beton f’c 14, 77,327 0.2 .
0.13 OH Pekerja 11,220 L.1
0.02 OH Tukang batu 2,200 L.3
0.00 OH Kepala tukang 300 L.9
0.01 OH Mandor 1,295 L.10
26.08 Kg Semen 33,904 M.12
60.80 Kg Pasir Beton (kg) 15,200 M.1020
82.32 Kg Kerikil (kg) 12,348 M.1017
17.20 L Air 860 M.1
A.4.1.2.2. P-079 1.00 m2 (K3) Pembuatan lahan produksi tebal 10 cm beton f’c 14 96,645 0.2 .
0.17 OH Pekerja 14,025 L.1
0.03 OH Tukang batu 2,800 L.3
0.00 OH Kepala tukang 450 L.9
0.01 OH Mandor 1,480 L.10
32.60 Kg Semen 42,380 M.12
76.00 Kg Pasir Beton (kg) 19,000 M.1020
102.90 Kg Kerikil (kg) 15,435 M.1017
21.50 L Air 1,075 M.1
A.4.1.2.3. P-080 1.00 m2 (K3) Pembuatan lahan produksi tebal 12 cm beton f’c 14 106,798 0.2 .
0.20 OH Pekerja 16,830 L.1
0.03 OH Tukang batu 3,300 L.3
0.00 OH Kepala tukang 450 L.9
0.01 OH Mandor 1,850 L.10
32.12 Kg Semen 41,756 M.12
91.20 Kg Pasir Beton (kg) 22,800 M.1020
123.48 Kg Kerikil (kg) 18,522 M.1017
25.80 L Air 1,290 M.1
A.4.1.2.4. P-081 1.00 m2 (K3) Pembuatan lahan produksi tebal 15 cm beton f’c 14 145,020 0.3 .
0.25 OH Pekerja 21,080 L.1
0.04 OH Tukang batu 4,100 L.3
0.00 OH Kepala tukang 600 L.9
0.01 OH Mandor 2,405 L.10
48.90 Kg Semen 63,570 M.12
114.00 Kg Pasir Beton (kg) 28,500 M.1020

Software RAB Exarch xPro 49/396


154.35 Kg Kerikil (kg) 23,153 M.1017
32.25 L Air 1,613 M.1
A.4.1.2.5. P-082 1.00 m2 Pembuatan bekisting untuk plat beton pracetak ( 5 kali p 322,940 0.1 .
0.01 OH Pekerja 595 L.1
0.08 OH Tukang batu 7,600 L.3
0.01 OH Kepala tukang 1,200 L.9
0.00 OH Mandor 185 L.10
0.08 m3 Lantai kerja tebal 10cm 60,000 M.1532
9.39 Kg Besi hollow 50.50.3 156,880 M.1111
0.01 m3 Kaso 5/7 Kelas II 17,500 M.1041
0.08 Lbr Phel film 12mm 11,600 M.1317
0.20 L Minyak bekisting 9,150 M.141
3.88 Bh Baut Ramset / Dina Bolt 58,230 M.109
A.4.1.2.6. P-083 1.00 m2 Pembuatan bekisting untuk balok beton pracetak ( 10-12 k 48,205 0.0 .
0.00 OH Pekerja 340 L.1
0.04 OH Tukang batu 3,800 L.3
0.00 OH Kepala tukang 600 L.9
0.00 OH Mandor 185 L.10
0.01 m3 Kaso 5/7 Kelas II 17,500 M.1041
0.04 Lbr Phel film 12mm 6,235 M.1317
0.20 L Minyak bekisting 9,150 M.141
0.69 Bh Baut Ramset / Dina Bolt 10,395 M.109
A.4.1.2.7. P-084 1.00 m2 Pembuatan bekisting untuk kolom beton pracetak (10-12 k 46,580 0.0 .
0.00 OH Pekerja 340 L.1
0.04 OH Tukang batu 3,800 L.3
0.00 OH Kepala tukang 600 L.9
0.00 OH Mandor 185 L.10
0.00 m3 Kaso 5/7 Kelas II 14,000 M.1041
0.05 Lbr Phel film 12mm 6,960 M.1317
0.20 L Minyak bekisting 9,150 M.141
0.05 Kg Paku Biasa 2" - 5" 1,150 M.111
0.69 Bh Baut Ramset / Dina Bolt 10,395 M.109
A.4.1.2.8. P-085 1.00 bh Pemasangan dan membuka bekisting komponen plat beto 7,230 0.1 .
0.05 OH Pekerja 4,505 L.1
0.02 OH Tukang kayu 1,800 L.6
0.01 OH Mandor 925 L.10
A.4.1.2.9. P-086 1.00 bh Pemasangan dan membuka bekisting komponen balok bet 11,490 0.1 .
0.09 OH Pekerja 7,565 L.1
0.03 OH Tukang kayu 3,000 L.6
0.01 OH Mandor 925 L.10
A.4.1.2.10. P-087 1.00 bh Pemasangan dan membuka bekisting komponen Kolom be 9,360 0.1 .
0.07 OH Pekerja 6,035 L.1
0.02 OH Tukang kayu 2,400 L.6
0.01 OH Mandor 925 L.10
A.4.1.2.11. P-088 1.00 bh Penuangan/menebar beton untuk komponen plat praceta 68,948 0.5 .
0.06 OH Pekerja 5,440 L.1
0.24 OH Tukang batu 24,400 L.3
0.13 OH Tukang vibrator 20,503 L.18
0.03 OH Kepala Tukang 5,100 L.9
0.07 OH Mandor 13,505 L.10
A.4.1.2.12. P-089 1.00 bh Penuangan/menebar beton untuk komponen balok prace 71,225 0.6 .
0.07 OH Pekerja 5,865 L.1
0.24 OH Tukang batu 24,200 L.3
0.14 OH Tukang vibrator 22,105 L.18
0.04 OH Kepala Tukang 5,550 L.9
0.07 OH Mandor 13,505 L.10
A.4.1.2.13. P-090 1.00 bh Penuangan/menebar beton untuk komponen kolom prace 64,482 0.5 .
0.06 OH Pekerja 5,185 L.1
0.21 OH Tukang batu 21,300 L.3
0.12 OH Tukang vibrator 19,542 L.18
0.03 OH Kepala Tukang 4,950 L.9
0.07 OH Mandor 13,505 L.10

Software RAB Exarch xPro 50/396


A.4.1.2.14. P-091 1.00 bh Ereksi komponen untuk pelat pracetak 564,459 0.5 .
0.07 OH Operator crane 9,199 L.23
0.07 OH Pembantu operator crane 7,666 L.24
0.07 OH Pekerja 5,695 L.1
0.07 OH Tukang batu 6,700 L.3
0.13 OH Tukang ereksi 21,464 L.11
0.07 OH Kepala tukang 10,050 L.9
0.07 OH Mandor 12,395 L.10
6.68 L Solar 56,746 M.1502
0.07 unit hari Sewa crane 82,544 A.24
1.10 Buah hariSewa pipe support 352,000 A.27
A.4.1.2.15. P-092 1.00 bh Ereksi komponen untuk balok pracetak 545,704 0.5 .
0.06 OH Operator crane 8,375 L.23
0.06 OH Pembantu operator crane 6,979 L.24
0.06 OH Pekerja 5,185 L.1
0.06 OH Tukang batu 6,100 L.3
0.12 OH Tukang ereksi 19,542 L.11
0.06 OH Kepala tukang 9,150 L.9
0.06 OH Mandor 11,285 L.10
6.11 L Solar 51,935 M.1502
0.06 unit hari Sewa crane 75,152 A.24
1.10 Buah hariSewa pipe support 352,000 A.27
A.4.1.2.16. P-093 1.00 bh Ereksi komponen untuk Kolom pracetak 967,253 0.7 .
0.08 OH Operator crane 11,396 L.23
0.08 OH Pembantu operator crane 9,496 L.24
0.08 OH Pekerja 7,055 L.1
0.08 OH Tukang batu 8,300 L.3
0.17 OH Tukang ereksi 26,590 L.11
0.08 OH Kepala tukang 12,450 L.9
0.08 OH Mandor 15,355 L.10
8.28 L Solar 70,355 M.1502
0.08 unit hari Sewa crane 102,256 A.24
2.20 Buah hariSewa pipe support 704,000 A.27
A.4.1.2.17. P-094 1.00 bh Melangsir komponen plat pracetak ( ± 20 m) 49,730 0.1 .
0.02 OH Pekerja 1,615 L.1
0.04 OH Tukang batu 3,800 L.3
0.02 OH Operator crane 2,609 L.23
0.02 OH Pembantu operator crane 2,174 L.24
1.90 L Solar 16,125 M.1502
0.02 UH Sewa crane 23,408 A.24
A.4.1.2.18. P-095 1.00 bh Melangsir komponen balok pracetak ( ± 20 m) 49,730 0.1 .
0.02 OH Pekerja 1,615 L.1
0.04 OH Tukang batu 3,800 L.3
0.02 OH Operator crane 2,609 L.23
0.02 OH Pembantu operator crane 2,174 L.24
1.90 L Solar 16,125 M.1502
0.02 UH Sewa crane 23,408 A.24
A.4.1.2.19. P-096 1.00 bh Melangsir komponen kolom pracetak ( ± 20 m) 49,730 0.1 .
0.02 OH Pekerja 1,615 L.1
0.04 OH Tukang batu 3,800 L.3
0.02 OH Operator crane 2,609 L.23
0.02 OH Pembantu operator crane 2,174 L.24
1.90 L Solar 16,125 M.1502
0.02 UH Sewa crane 23,408 A.24
A.4.1.2.20. P-097 1.00 m3 Grouting campuran 3,562,500 - .
1200.00 Kg Semen grout 1,920,000 M.1022
650.00 Kg Screening 1,625,000 M.1153
350.00 L Air 17,500 M.1
A.4.1.2.21. P-098 1.00 m3 Grouting tidak campuran 2,980,000 - .
1850.00 Kg Semen grout 2,960,000 M.1022
400.00 L Air 20,000 M.1
A.4.1.2.22. P-099 1.00 titik Upah melakukan grouting pada join pracetak 54,645 0.5 .

Software RAB Exarch xPro 51/396


0.37 OH Tukang batu 36,700 L.3
0.07 OH Kepala tukang 11,100 L.9
0.04 OH Mandor 6,845 L.10
A.4.1.2.23. P-100 1.00 titik Pemasangan Bekisting join pracetak 88,970 0.3 .
0.15 OH Pekerja 12,495 L.1
0.15 OH Tukang kayu 14,700 L.6
0.02 OH Kepala tukang 2,250 L.9
0.01 OH Mandor 925 L.10
0.01 m3 Kaso 5/7 Kelas II 42,000 M.1041
0.00 m3 Kayu papan kelas III 10,000 M.1087
0.26 Kg Paku Biasa 2" - 5" 6,600 M.111
A.4.1.2.24. P-101 1.00 titik Upah Join dengan Sling 64,735 0.7 .
0.22 OH Pekerja 18,700 L.1
0.22 OH Tukang kayu 22,000 L.6
0.22 OH Tukang besi 22,000 L.4
0.01 OH Mandor 2,035 L.10
A.4.2.1.1. P-102 1.00 titik Pemasangan besi profil 34,106 0.1 .
0.06 OH Pekerja 5,100 L.1
0.06 OH Tukang Las Konstruksi 9,611 L.15
0.01 OH Kepala tukang 900 L.9
0.00 OH Mandor 555 L.10
1.15 Kg Besi Profil 17,940 M.1115
A.4.2.1.2. P-103 1.00 kg Pemasangan rangka kuda-kuda baja IWF 25,136 0.1 .
0.06 OH Pekerja 5,100 L.1
0.06 OH Tukang Las Konstruksi 9,611 L.15
0.01 OH Kepala tukang 900 L.9
0.00 OH Mandor 555 L.10
1.15 Kg Besi IWF 8,970 M.1112
A.4.2.1.3. P-104 1.00 kg Pengerjaan pekerjaan perakitan 897 0.0 .
0.00 OH Pekerja 85 L.1
0.00 OH Tukang Besi Konstruksi 161 L.26
0.00 OH Kepala tukang 2 L.9
0.00 OH Mandor 9 L.10
0.01 Ltr Solar 85 M.1502
0.00 Ltr Minyak pelumas 35 M.1496
0.01 Jam Sewa alat Perakitan Baja IWF 520 A.22
A.4.2.1.4. P-105 1.00 m2 Pembuatan pintu besi plat baja tebal 2 mm rangkap, ran 825,121 2.3 .
1.05 OH Pekerja 89,250 L.1
1.05 OH Tukang Las 168,191 L.14
0.11 OH Kepala tukang 15,750 L.9
0.05 OH Mandor 9,620 L.10
15.00 Kg Besi siku L 30.30.3 201,000 M.1117
32.80 Kg Besi plat baja 334,560 M.1114
0.05 Kg Kawat las listrik 6,750 M.137
A.4.2.1.5. P-106 1.00 m1 Pengerjaan pengelasan dengan las listrik 907,400 0.6 .
0.40 OH Pekerja 34,000 L.1
0.20 OH Tukang Besi Konstruksi 32,200 L.26
0.02 OH Kepala tukang 3,000 L.9
0.02 OH Mandor 3,700 L.10
4.00 Kg Kawat las listrik 540,000 M.137
3.00 Ltr Solar 25,500 M.1502
0.40 Ltr Minyak pelumas 14,000 M.1496
1.70 Jam Sewa alat las 255,000 A.6
A.4.2.1.6. P-107 1.00 m2 Pembuatan rangka jendela besi scuare tube (25 x 5) cm 594,668 1.4 .
0.65 OH Pekerja 55,250 L.1
0.65 OH Tukang Las 104,118 L.14
0.07 OH Kepala tukang 9,750 L.9
0.03 OH Mandor 5,920 L.10
4.76 m Besi square tube 126,140 M.1118
4.52 m Besi lis kaca (1 x 1) cm 203,490 M.1113
20.00 cm Pengelasan 90,000 M.1533
A.4.2.1.7. P-108 1.00 m2 Pemasangan pintu rolling door besi 863,328 2.5 .

Software RAB Exarch xPro 52/396


1.20 OH Pekerja 102,000 L.1
1.20 OH Tukang Las 192,218 L.14
0.12 OH Kepala tukang 18,000 L.9
0.01 OH Mandor 1,110 L.10
1.00 m2 Pintu gulung besi 550,000 M.1148
A.4.2.1.8. P-109 1.00 m2 Pemasangan pintu lipat (folding door) plastik/PVC 592,070 0.9 .
0.44 OH Pekerja 37,400 L.1
0.44 OH Tukang kayu 44,000 L.6
0.04 OH Kepala tukang 6,600 L.9
0.02 OH Mandor 4,070 L.10
1.00 m2 Pintu lipat 500,000 M.1522
A.4.2.1.9. P-110 1.00 m2 Pemasangan sunscreen alluminium 349,540 1.0 .
0.08 OH Pekerja 6,800 L.1
0.80 OH Tukang Besi 80,000 L.4
0.08 OH Kepala tukang 12,000 L.9
0.00 OH Mandor 740 L.10
1.00 m2 Sunscreen alumunium 250,000 M.1155
A.4.2.1.10. P-111 1.00 m2 Pemasangan rolling door alluminium 729,250 2.2 .
1.00 OH Pekerja 85,000 L.1
1.00 OH Tukang Besi 100,000 L.4
0.10 OH Kepala tukang 15,000 L.9
0.05 OH Mandor 9,250 L.10
1.00 m2 Rolling door alluminium 520,000 M.1152
A.4.2.1.11. P-112 1.00 m1 Pemasangan kusen pintu alluminium 35,989 0.1 .
0.04 OH Pekerja 3,655 L.1
0.04 OH Tukang Besi 4,300 L.4
0.00 OH Kepala tukang 645 L.9
0.00 OH Mandor 389 L.10
1.10 m Profil Alluminium "T" 13,420 M.1149
2.00 bh Sekrup fixer 500 M.1154
0.06 Tube Sealant 13,080 M.1535
A.4.2.1.12. P-113 1.00 m2 Pemasangan pintu alluminium strip lebar 8 cm 445,217 0.2 .
0.09 OH Pekerja 7,225 L.1
0.09 OH Tukang Besi 8,500 L.4
0.01 OH Kepala tukang 1,275 L.9
0.00 OH Mandor 777 L.10
4.40 m Profil Alluminium "T" 53,680 M.1149
14.60 m Aluminium strip 373,760 M.1106
A.4.2.1.13. P-114 1.00 m2 Pemasangan pintu kaca rangka alluminium 2,349,360 0.2 .
0.09 OH Pekerja 7,225 L.1
0.09 OH Tukang Besi 8,500 L.4
0.01 OH Kepala tukang 1,350 L.9
0.01 OH Mandor 925 L.10
4.40 m Pintu alluminium 1,980,000 M.1146
4.50 m Profil kaca 292,500 M.1472
0.27 Tube Sealant 58,860 M.1535
A.4.2.1.14. P-115 1.00 m2 Pemasangan venetions blinds dan Vertical blinds 169,394 0.8 .
0.35 OH Pekerja 29,750 L.1
0.35 OH Tukang Interior 56,064 L.13
0.04 OH Kepala tukang 5,250 L.9
0.02 OH Mandor 3,330 L.10
1.00 m2 Venetions blinds dan vertical blinds (tirai) 75,000 M.1540
A.4.2.1.15. P-116 1.00 m2 Pemasangan terali besi strip (2 x 3) mm 648,930 3.6 .
1.67 OH Pekerja 141,950 L.1
1.67 OH Tukang Las 267,503 L.14
0.17 OH Kepala tukang 25,050 L.9
0.08 OH Mandor 15,355 L.10
6.18 kg Baja strip (0,2 x 2) cm 77,213 M.15
27.08 cm Pengelasan 121,860 M.1533
A.4.2.1.16. P-117 1.00 m2 Pemasangan kawat nyamuk 105,570 0.2 .
0.10 OH Pekerja 8,500 L.1
0.10 OH Tukang Kayu 10,000 L.6

Software RAB Exarch xPro 53/396


0.01 OH Kepala tukang 1,500 L.9
0.01 OH Mandor 925 L.10
1.10 m2 Kawat nyamuk 13,200 M.1128
11.11 cm Pengelasan 49,995 M.1533
1.72 kg Baja strip (0,2 x 2) cm 21,450 M.15
A.4.2.1.17. P-118 1.00 m2 Pemasangan jendela nako & tralis 195,685 0.4 .
0.20 OH Pekerja 17,000 L.1
0.20 OH Tukang Kayu 20,000 L.6
0.02 OH Kepala tukang 3,000 L.9
0.00 OH Mandor 185 L.10
1.10 m2 Jendela nako (rangka + kaca 5 mm) 60,500 M.136
10.00 bh Paku sekrup 7,500 M.112
7.00 m Baja strip (0,2 x 2) cm 87,500 M.15
A.4.2.1.18. P-119 1.00 m1 Pemasangan talang datar/ jurai seng bjls 28 lebar 90 cm 149,060 0.4 .
0.20 OH Pekerja 17,000 L.1
0.20 OH Tukang Atap 20,000 L.2
0.02 OH Kepala tukang 3,000 L.9
0.00 OH Mandor 185 L.10
0.60 lbr Seng Gelombang 3" x 6" BJLS 28 42,000 M.61
0.02 kg Paku Biasa 2" - 5" 375 M.111
0.02 m3 Kayu Papan kelas II 66,500 M.1086
A.4.2.1.19 P-120 1.00 m1 Pemasangan talang ½ lingkaran D-15 cm, seng plat bjls 97,230 0.5 .
0.15 OH Pekerja 12,750 L.1
0.30 OH Tukang Atap 30,000 L.2
0.03 OH Kepala tukang 4,500 L.9
0.01 OH Mandor 1,480 L.10
0.60 lbr Seng Gelombang 3" x 6" BJLS 28 42,000 M.61
0.01 kg Paku Biasa 2" - 5" 250 M.111
0.50 kg Baja strip (0,2 x 2) cm 6,250 M.15
A.4.2.1.20. P-121 1.00 m2 Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 158,780 0.5 .
0.25 OH Pekerja 21,250 L.1
0.25 OH Tukang Besi 25,000 L.4
0.03 OH Kepala Tukang 3,750 L.9
0.01 OH Mandor 2,405 L.10
3.50 M1 Hollow 4/4 81,375 M.25
1.00 Ls Alat Bantu Pengelasan 25,000 A.2
A.4.2.1.21. P-122 1.00 m2 Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 191,330 0.8 .
0.35 OH Pekerja 29,750 L.1
0.35 OH Tukang Besi 35,000 L.4
0.04 OH Kepala Tukang 5,250 L.9
0.02 OH Mandor 3,330 L.10
4.00 M1 Hollow 4/4 93,000 M.25
1.00 Ls Alat Bantu Pengelasan 25,000 A.2
A.4.2.1.22. P-123 1.00 m2 (K3) Pemasangan atap pelana rangka atap baja canai din 258,104 1.6 .
0.76 OH Pekerja 64,634 L.1
0.76 OH Tukang Besi 76,040 L.4
0.08 OH Kepala Tukang 11,400 L.9
0.04 OH Mandor 7,030 L.10
4.05 m1 Baja Ringan-C Truss 54,000 M.36
0.10 Ls Alat Bantu Rangka Baja Ringan 45,000 A.3
A.4.2.1.23. P-124 1.00 m2 (K3) Pemasangan atap jurai rangka atap baja canai dingi 252,585 1.6 .
0.73 OH Pekerja 62,390 L.1
0.73 OH Tukang Besi 73,400 L.4
0.07 OH Kepala Tukang 10,950 L.9
0.04 OH Mandor 6,845 L.10
4.05 m1 Baja Ringan-C Truss 54,000 M.36
0.10 Ls Alat Bantu Rangka Baja Ringan 45,000 A.3
A.4.2.1.24. P-125 1.00 m2 Pemasangan PASANG KUDA-KUDA BAJA RINGAN + 250,450 0.7 .
0.20 OH Pekerja 17,000 L.1
0.45 OH Tukang Besi 45,000 L.4
0.01 OH Kepala Tukang 1,500 L.9
0.05 OH Mandor 9,250 L.10

Software RAB Exarch xPro 54/396


3.72 M' Baja Ringan-C Truss 49,600 M.36
28.00 bh Screw 14,000 M.113
2.00 bh Baut Ramset / Dina Bolt 30,000 M.109
5.40 M' Baja Ringan-Reng Truss 36,000 M.35
0.12 M' Talang Jurai 3,100 M.39
0.10 Ls Alat Bantu Rangka Baja Ringan 45,000 A.3
A.4.4.1.1. P-126 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal 1 ba 247,500 0.9 .
0.60 OH Pekerja 51,000 L.1
0.20 OH Tukang Batu 20,000 L.3
0.02 OH Kepala Tukang 3,000 L.9
0.03 OH Mandor 5,550 L.10
140.00 bh Bata merah 91,000 M.2
43.50 Kg Semen 56,550 M.12
0.08 m3 Pasir Pasang 20,400 M.9
A.4.4.1.2. P-127 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal 1 ba 236,590 0.9 .
0.60 OH Pekerja 51,000 L.1
0.20 OH Tukang Batu 20,000 L.3
0.02 OH Kepala Tukang 3,000 L.9
0.03 OH Mandor 5,550 L.10
140.00 bh Bata merah 91,000 M.2
32.95 Kg Semen 42,835 M.12
0.09 m3 Pasir Pasang 23,205 M.9
A.4.4.1.3. P-128 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal 1 ba 228,780 0.9 .
0.60 OH Pekerja 51,000 L.1
0.20 OH Tukang Batu 20,000 L.3
0.02 OH Kepala Tukang 3,000 L.9
0.03 OH Mandor 5,550 L.10
140.00 bh Bata merah 91,000 M.2
26.55 Kg Semen 34,515 M.12
0.09 m3 Pasir Pasang 23,715 M.9
A.4.4.1.4. P-129 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal 1 ba 225,420 0.9 .
0.60 OH Pekerja 51,000 L.1
0.20 OH Tukang Batu 20,000 L.3
0.02 OH Kepala Tukang 3,000 L.9
0.03 OH Mandor 5,550 L.10
140.00 bh Bata merah 91,000 M.2
22.20 Kg Semen 28,860 M.12
0.10 m3 Pasir Pasang 26,010 M.9
A.4.4.1.5. P-130 1.00 m2 Pemasangan Dinding Bata Merah (5x11x22) cm tebal 1 b 225,710 0.9 .
0.60 OH Pekerja 51,000 L.1
0.20 OH Tukang Batu 20,000 L.3
0.02 OH Kepala Tukang 3,000 L.9
0.03 OH Mandor 5,550 L.10
140.00 bh Bata merah 91,000 M.2
18.50 Kg Semen 24,050 M.12
0.12 m3 Pasir Pasang 31,110 M.9
A.4.4.1.6 P-131 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal 1 b 216,963 0.9 .
0.60 OH Pekerja 51,000 L.1
0.20 OH Tukang Batu 20,000 L.3
0.02 OH Kepala Tukang 3,000 L.9
0.03 OH Mandor 5,550 L.10
140.00 bh Bata merah 91,000 M.2
10.08 Kg Semen 13,104 M.12
0.03 m3 Kapur 9,721 M.1013
0.09 m3 Pasir Pasang 23,588 M.9
A.4.4.1.7 P-132 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal ½ ba 119,600 0.4 .
0.30 OH Pekerja 25,500 L.1
0.10 OH Tukang Batu 10,000 L.3
0.01 OH Kepala Tukang 1,500 L.9
0.02 OH Mandor 2,775 L.10
70.00 bh Bata merah 45,500 M.2
18.95 Kg Semen 24,635 M.12

Software RAB Exarch xPro 55/396


0.04 m3 Pasir Pasang 9,690 M.9
A.4.4.1.8 P-133 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal ½ ba 114,156 0.4 .
0.30 OH Pekerja 25,500 L.1
0.10 OH Tukang Batu 10,000 L.3
0.01 OH Kepala Tukang 1,500 L.9
0.02 OH Mandor 2,775 L.10
70.00 bh Bata merah 45,500 M.2
14.37 Kg Semen 18,681 M.12
0.04 m3 Pasir Pasang 10,200 M.9
A.4.4.1.9 P-134 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal ½ b 111,190 0.4 .
0.30 OH Pekerja 25,500 L.1
0.10 OH Tukang Batu 10,000 L.3
0.01 OH Kepala Tukang 1,500 L.9
0.02 OH Mandor 2,775 L.10
70.00 m3 Bata merah 45,500 M.2
11.50 Kg Semen 14,950 M.12
0.04 m3 Pasir Pasang 10,965 M.9
A.4.4.1.10 P-135 1.00 m2 Pemasangan dinding bata merah (5x11x22)cm tebal ½ ba 109,334 0.4 .
0.30 OH Pekerja 25,500 L.1
0.10 OH Tukang Batu 10,000 L.3
0.01 OH Kepala Tukang 1,500 L.9
0.02 OH Mandor 2,775 L.10
70.00 bh Bata merah 45,500 M.2
9.68 Kg Semen 12,584 M.12
0.05 m3 Pasir Pasang 11,475 M.9
A.4.4.1.11 P-136 1.00 m2 Pemasangan dinding bata merah (5x11x22)cm tebal ½ ba 108,586 0.4 .
0.30 OH Pekerja 25,500 L.1
0.10 OH Tukang Batu 10,000 L.3
0.01 OH Kepala Tukang 1,500 L.9
0.02 OH Mandor 2,775 L.10
70.00 bh Bata merah 45,500 M.2
8.32 Kg Semen 10,816 M.12
0.05 m3 Pasir Pasang 12,495 M.9
A.4.4.1.12 P-137 1.00 m2 Pemasangan dinding bata merah (5x11x22)cm tebal ½ bat 106,475 0.4 .
0.30 OH Pekerja 25,500 L.1
0.10 OH Tukang Batu 10,000 L.3
0.01 OH Kepala Tukang 1,500 L.9
0.02 OH Mandor 2,775 L.10
70.00 bh Bata merah 45,500 M.2
6.50 Kg Semen 8,450 M.12
0.05 m3 Pasir Pasang 12,750 M.9
A.4.4.1.13 P-138 1.00 m2 Pemasangan dinding bata merah (5x11x22)cm tebal ½ ba 109,178 0.4 .
0.30 OH Pekerja 25,500 L.1
0.10 OH Tukang Batu 10,000 L.3
0.01 OH Kepala Tukang 1,500 L.9
0.02 OH Mandor 2,775 L.10
70.00 bh Bata merah 45,500 M.2
4.50 Kg Semen 5,850 M.12
0.02 m3 Kapur 5,303 M.1013
0.05 m3 Pasir Pasang 12,750 M.9
A.4.4.1.14 P-139 1.00 m2 Pemasangan dinding bata merah (5x11x22)cm tebal ½ b 96,498 0.4 .
0.30 OH Pekerja 25,500 L.1
0.10 OH Tukang Batu 10,000 L.3
0.01 OH Kepala Tukang 1,500 L.9
0.02 OH Mandor 2,775 L.10
70.00 bh Bata merah 45,500 M.2
0.02 Kg Semen Warna 270 M.13
0.02 m3 Kapur 6,363 M.1013
0.02 m3 Pasir Pasang 4,590 M.9
A.4.4.1.15 P-140 1.00 m2 Pemasangan dinding bata merah (5x11x22) cm tebal ½ b 97,574 0.4 .
0.30 OH Pekerja 25,500 L.1
0.10 OH Tukang Batu 10,000 L.3

Software RAB Exarch xPro 56/396


0.01 OH Kepala Tukang 1,500 L.9
0.02 OH Mandor 2,775 L.10
70.00 bh Bata merah 45,500 M.2
0.01 Kg Semen Warna 210 M.13
0.01 m3 Kapur 4,949 M.1013
0.03 m3 Pasir Pasang 7,140 M.9
A.4.4.1.16 P-141 1.00 m2 Pemasangan dinding conblock HB20 campuran 1SP : 3P 415,966 0.5 .
0.35 OH Pekerja 29,750 L.1
0.15 OH Tukang Batu 15,000 L.3
0.02 OH Kepala Tukang 2,250 L.9
0.02 OH Mandor 3,330 L.10
12.50 bh Hollow Block 20 137,500 M.1479
30.32 Kg Semen 39,416 M.12
0.73 m3 Pasir Pasang 185,640 M.9
0.28 Kg Besi angkur Ø=8 mm 3,080 M.1110
A.4.4.1.17 P-142 1.00 m2 Pemasangan dinding conblock HB20 campuran 1SP:4PP 419,308 0.5 .
0.35 OH Pekerja 29,750 L.1
0.15 OH Tukang Batu 15,000 L.3
0.02 OH Kepala Tukang 2,250 L.9
0.02 OH Mandor 3,330 L.10
12.50 m3 Hollow Block 20 137,500 M.1479
24.26 Kg Semen 31,538 M.12
0.77 m3 Pasir Pasang 196,860 M.9
0.28 Kg Besi angkur Ø=8 mm 3,080 M.1110
A.4.4.1.8 P-143 1.00 m2 Pemasangan dinding conblock HB15 campuran 1SP :3P 304,352 0.5 .
0.32 OH Pekerja 27,200 L.1
0.12 OH Tukang Batu 12,000 L.3
0.01 OH Kepala Tukang 1,800 L.9
0.02 OH Mandor 2,960 L.10
12.50 bh Hollow Block 15 87,500 M.1478
22.74 Kg Semen 29,562 M.12
0.55 m3 Pasir Pasang 140,250 M.9
0.28 Kg Besi angkur Ø=8 mm 3,080 M.1110
A.4.4.1.19 P-144 1.00 m2 Pemasangan dinding conblock HB15 campuran 1SP :4P 306,610 0.5 .
0.32 OH Pekerja 27,200 L.1
0.12 OH Tukang Batu 12,000 L.3
0.01 OH Kepala Tukang 1,800 L.9
0.02 OH Mandor 2,960 L.10
12.50 m3 Hollow Block 15 87,500 M.1478
18.20 Kg Semen 23,660 M.12
0.58 m3 Pasir Pasang 148,410 M.9
0.28 Kg Besi angkur Ø=8 mm 3,080 M.1110
A.4.4.1.20 P-145 1.00 m2 Pemasangan dinding conblock HB10 campuran 1SP :3P 236,633 0.4 .
0.30 OH Pekerja 25,500 L.1
0.10 OH Tukang Batu 10,000 L.3
0.01 OH Kepala Tukang 1,500 L.9
0.02 OH Mandor 2,775 L.10
12.50 bh Hollow Block 10 81,250 M.1477
15.16 Kg Semen 19,708 M.12
0.36 m3 Pasir Pasang 92,820 M.9
0.28 Kg Besi angkur Ø=8 mm 3,080 M.1110
A.4.4.1.21 P-146 1.00 m2 Pemasangan dinding conblock HB10 campuran 1SP :4P 238,814 0.4 .
0.30 OH Pekerja 25,500 L.1
0.10 OH Tukang Batu 10,000 L.3
0.01 OH Kepala Tukang 1,500 L.9
0.02 OH Mandor 2,775 L.10
12.50 bh Hollow Block 10 81,250 M.1477
12.13 Kg Semen 15,769 M.12
0.39 m3 Pasir Pasang 98,940 M.9
0.28 Kg Besi angkur Ø=8 mm 3,080 M.1110
A.4.4.1.22 P-147 1.00 m2 Pemasangan dinding terawang (rooster) 12x11x24 campu 85,500 0.4 .
0.30 OH Pekerja 25,500 L.1

Software RAB Exarch xPro 57/396


0.10 OH Tukang Batu 10,000 L.3
0.01 OH Kepala Tukang 1,500 L.9
0.02 OH Mandor 2,775 L.10
30.00 bh Bata rooster 22,500 M.1006
11.00 Kg Semen 14,300 M.12
0.04 m3 Pasir Pasang 8,925 M.9
A.4.4.1.23 P-148 1.00 m2 Pemasangan dinding terawang (rooster) 12x11x24 campu 108,000 0.4 .
0.30 OH Pekerja 25,500 L.1
0.10 OH Tukang Batu 10,000 L.3
0.01 OH Kepala Tukang 1,500 L.9
0.02 OH Mandor 2,775 L.10
30.00 bh Bata berongga 45,000 M.1004
11.00 Kg Semen 14,300 M.12
0.04 m3 Pasir Pasang 8,925 M.9
A.4.4.1.24 P-149 1.00 m2 Pemasangan dinding bata berongga ekspose 12x11x24 ca 124,385 0.5 .
0.30 OH Pekerja 25,500 L.1
0.15 OH Tukang Batu 15,000 L.3
0.02 OH Kepala Tukang 2,250 L.9
0.02 OH Mandor 2,775 L.10
70.00 m3 Bata rooster 52,500 M.1006
14.00 Kg Semen 18,200 M.12
0.03 m3 Pasir Pasang 8,160 M.9
A.4.4.1.25 P-150 1.00 m2 Pemasangan dinding bata ringan tebal 7,5 cm dengan mort 307,858 0.5 .
0.35 OH Pekerja 29,750 L.1
0.13 OH Tukang Batu 13,000 L.3
0.01 OH Kepala Tukang 1,950 L.9
0.00 OH Mandor 555 L.10
0.08 m3 Bata ringan tebal 7,5 cm 211,111 M.1003
2.77 Kg Mortar siap pakai 30,492 M.1019
0.10 Ls Bahan Pasang Dinding Bata Ringan 21,000 A.7
A.4.4.1.26 P-151 1.00 m2 Pemasangan dinding bata ringan tebal 10 cm dengan mort 399,636 0.5 .
0.35 OH Pekerja 29,750 L.1
0.13 OH Tukang Batu 13,000 L.3
0.01 OH Kepala Tukang 1,950 L.9
0.00 OH Mandor 555 L.10
0.10 m3 Bata ringan tebal 7,5 cm 281,481 M.1003
4.40 Kg Mortar siap pakai 48,400 M.1019
0.10 Ls Peralatan Pasang Dinding Bata Ringan 24,500 A.12
A.4.4.2.1. P-152 1.00 m2 Pemasangan plesteran 1SP : 1PP tebal 15 mm. 69,760 0.5 .
0.30 OH Pekerja 25,500 L.1
0.15 OH Tukang Batu 15,000 L.3
0.02 OH Kepala Tukang 2,250 L.9
0.02 OH Mandor 2,775 L.10
15.50 Kg Semen 20,155 M.12
0.02 m3 Pasir Pasang 4,080 M.9
A.4.4.2.2. P-153 1.00 m2 Pemasangan plesteran 1SP : 2PP tebal 15 mm. 63,916 0.5 .
0.30 OH Pekerja 25,500 L.1
0.15 OH Tukang Batu 15,000 L.3
0.02 OH Kepala Tukang 2,250 L.9
0.02 OH Mandor 2,775 L.10
10.22 Kg Semen 13,291 M.12
0.02 m3 Pasir Pasang 5,100 M.9
A.4.4.2.3. P-154 1.00 m2 Pemasangan plesteran 1SP : 3PP tebal 15mm. 61,499 0.5 .
0.30 OH Pekerja 25,500 L.1
0.15 OH Tukang Batu 15,000 L.3
0.02 OH Kepala Tukang 2,250 L.9
0.02 OH Mandor 2,775 L.10
7.78 Kg Semen 10,109 M.12
0.02 m3 Pasir Pasang 5,865 M.9
A.4.4.2.4. P-155 1.00 m2 Pemasangan plesteran 1SP : 4PP tebal 15 mm 59,757 0.5 .
0.30 OH Pekerja 25,500 L.1
0.15 OH Tukang Batu 15,000 L.3

Software RAB Exarch xPro 58/396


0.02 OH Kepala Tukang 2,250 L.9
0.02 OH Mandor 2,775 L.10
6.24 Kg Semen 8,112 M.12
0.02 m3 Pasir Pasang 6,120 M.9
A.4.4.2.5. P-156 1.00 m2 Pemasangan plesteran 1SP : 5PP tebal 15 mm 58,894 0.5 .
0.30 OH Pekerja 25,500 L.1
0.15 OH Tukang Batu 15,000 L.3
0.02 OH Kepala Tukang 2,250 L.9
0.02 OH Mandor 2,775 L.10
5.18 Kg Semen 6,739 M.12
0.03 m3 Pasir Pasang 6,630 M.9
A.4.4.2.6. P-157 1.00 m2 Pemasangan plesteran 1SP : 6PP tebal 15 mm. 58,151 0.5 .
0.30 OH Pekerja 25,500 L.1
0.15 OH Tukang Batu 15,000 L.3
0.02 OH Kepala Tukang 2,250 L.9
0.02 OH Mandor 2,775 L.10
4.42 Kg Semen 5,741 M.12
0.03 m3 Pasir Pasang 6,885 M.9
A.4.4.2.7. P-158 1.00 m2 Pemasangan plesteran 1SP : 7PP tebal 15 mm 57,782 0.5 .
0.30 OH Pekerja 25,500 L.1
0.15 OH Tukang Batu 15,000 L.3
0.02 OH Kepala Tukang 2,250 L.9
0.02 OH Mandor 2,775 L.10
3.94 Kg Semen 5,117 M.12
0.03 m3 Pasir Pasang 7,140 M.9
A.4.4.2.8. P-159 1.00 m2 Pemasangan plesteran 1SP : 8PP tebal 15 mm 57,413 0.5 .
0.30 OH Pekerja 25,500 L.1
0.15 OH Tukang Batu 15,000 L.3
0.02 OH Kepala Tukang 2,250 L.9
0.02 OH Mandor 2,775 L.10
3.46 Kg Semen 4,493 M.12
0.03 m3 Pasir Pasang 7,395 M.9
A.4.4.2.9. P-160 1.00 m2 Pemasangan plesteran 1SP : 1/2KP : 3PP tebal 15 mm 60,003 0.5 .
0.36 OH Pekerja 30,600 L.1
0.12 OH Tukang Batu 12,000 L.3
0.01 OH Kepala Tukang 1,800 L.9
0.02 OH Mandor 3,330 L.10
5.76 Kg Semen 7,488 M.12
0.00 m3 Kapur Pasang 1,470 M.1015
0.01 m3 Pasir Pasang 3,315 M.9
A.4.4.2.10. P-161 1.00 m2 Pemasangan plesteran 1SP : 2KP : 8PP tebal 15 mm 59,180 0.5 .
0.36 OH Pekerja 30,600 L.1
0.12 OH Tukang Batu 12,000 L.3
0.01 OH Kepala Tukang 1,800 L.9
0.02 OH Mandor 3,330 L.10
3.00 Kg Semen 3,900 M.12
0.01 m3 Kapur Pasang 2,450 M.1015
0.02 m3 Pasir Pasang 5,100 M.9
A.4.4.2.11. P-162 1.00 m2 Pemasangan plesteran 1SM : 1KP : 1PP tebal 15 mm 54,447 0.5 .
0.36 OH Pekerja 30,600 L.1
0.12 OH Tukang Batu 12,000 L.3
0.01 OH Kepala Tukang 1,800 L.9
0.02 OH Mandor 3,330 L.10
0.01 m3 Semen 12 M.12
0.01 m3 Kapur Pasang 4,410 M.1015
0.01 m3 Pasir Pasang 2,295 M.9
A.4.4.2.12. P-163 1.00 m2 Pemasangan plesteran 1SM : 1KP : 2PP tebal 15 mm 54,994 0.5 .
0.36 OH Pekerja 30,600 L.1
0.12 OH Tukang Batu 12,000 L.3
0.01 OH Kepala Tukang 1,800 L.9
0.02 OH Mandor 3,330 L.10
0.01 m3 Semen 9 M.12

Software RAB Exarch xPro 59/396


0.01 m3 Kapur Pasang 3,430 M.1015
0.02 m3 Pasir Pasang 3,825 M.9
A.4.4.2.13. P-164 1.00 m2 Pemasangan plesteran 1SP : 1PP tebal 20 mm 85,677 0.6 .
0.40 OH Pekerja 34,000 L.1
0.20 OH Tukang Batu 20,000 L.3
0.02 OH Kepala Tukang 3,000 L.9
0.02 OH Mandor 4,070 L.10
13.63 Kg Semen 17,722 M.12
0.03 m3 Pasir Pasang 6,885 M.9
A.4.4.2.14. P-165 1.00 m2 Pemasangan plesteran 1SP : 3PP tebal 20 mm 68,888 0.5 .
0.26 OH Pekerja 22,100 L.1
0.20 OH Tukang Batu 20,000 L.3
0.02 OH Kepala Tukang 3,000 L.9
0.01 OH Mandor 2,405 L.10
10.37 Kg Semen 13,478 M.12
0.03 m3 Pasir Pasang 7,905 M.9
A.4.4.2.15. P-166 1.00 m2 Pemasangan plesteran 1SP : 4PP tebal 20 mm. 80,046 0.6 .
0.40 OH Pekerja 34,000 L.1
0.20 OH Tukang Batu 20,000 L.3
0.02 OH Kepala Tukang 3,000 L.9
0.02 OH Mandor 4,070 L.10
8.32 Kg Semen 10,816 M.12
0.03 m3 Pasir Pasang 8,160 M.9
A.4.4.2.16. P-167 1.00 m2 Pemasangan plesteran 1SP : 5PP tebal 20 mm 78,981 0.6 .
0.40 OH Pekerja 34,000 L.1
0.20 OH Tukang Batu 20,000 L.3
0.02 OH Kepala Tukang 3,000 L.9
0.02 OH Mandor 4,070 L.10
6.91 Kg Semen 8,986 M.12
0.04 m3 Pasir Pasang 8,925 M.9
A.4.4.2.17. P-168 1.00 m2 Pemasangan plesteran 1SP : 6PP tebal 20 mm 77,904 0.6 .
0.40 OH Pekerja 34,000 L.1
0.20 OH Tukang Batu 20,000 L.3
0.02 OH Kepala Tukang 3,000 L.9
0.02 OH Mandor 4,070 L.10
5.89 Kg Semen 7,654 M.12
0.04 m3 Pasir Pasang 9,180 M.9
A.4.4.2.18. P-169 1.00 m2 Pemasangan plesteran 1SM : 1KP : 2PP tebal 20 mm 75,782 0.7 .
0.44 OH Pekerja 37,400 L.1
0.22 OH Tukang Batu 22,000 L.3
0.02 OH Kepala Tukang 3,300 L.9
0.02 OH Mandor 4,070 L.10
0.01 m3 Semen 12 M.12
0.01 m3 Kapur Pasang 4,410 M.1015
0.02 m3 Pasir Pasang 4,590 M.9
A.4.4.2.19. P-170 1.00 m2 Pemasangan berapen 1SP : 5PP tebal 15 mm 36,299 0.2 .
0.15 OH Pekerja 12,750 L.1
0.08 OH Tukang Batu 7,500 L.3
0.01 OH Kepala Tukang 1,200 L.9
0.01 OH Mandor 1,480 L.10
5.18 Kg Semen 6,739 M.12
0.03 m3 Pasir Pasang 6,630 M.9
A.4.4.2.20. P-171 1.00 m1 Pemasangan plesteran skoning 1SP : 3PP lebar 10 cm 57,505 0.5 .
0.08 OH Pekerja 6,800 L.1
0.40 OH Tukang Batu 40,000 L.3
0.04 OH Kepala Tukang 6,000 L.9
0.00 OH Mandor 740 L.10
0.50 Kg Semen 650 M.12
0.01 m3 Pasir Pasang 3,315 M.9
A.4.4.2.21. P-172 1.00 m2 Pemasangan plesteran granit 1SP : 2 granit tebal 1cm 306,455 0.7 .
0.45 OH Pekerja 38,250 L.1
0.23 OH Tukang Batu 22,500 L.3

Software RAB Exarch xPro 60/396


0.02 OH Kepala Tukang 3,450 L.9
0.02 OH Mandor 4,255 L.10
10.00 Kg Semen 13,000 M.12
15.00 Kg Batu granit 225,000 M.1008
A.4.4.2.22. P-173 1.00 m2 Pemasangan plesteran traso 1SP : 2 traso tebal 1cm 117,455 0.7 .
0.45 OH Pekerja 38,250 L.1
0.23 OH Tukang Batu 22,500 L.3
0.02 OH Kepala Tukang 3,450 L.9
0.02 OH Mandor 4,255 L.10
10.00 Kg Semen 13,000 M.12
15.00 Kg Batu teraso 36,000 M.1012
A.4.4.2.23. P-174 1.00 m2 Pemasangan plesteran ciprat 1SP : 2PP 46,921 0.4 .
0.30 OH Pekerja 25,500 L.1
0.10 OH Tukang Batu 10,000 L.3
0.01 OH Kepala Tukang 1,500 L.9
0.02 OH Mandor 2,775 L.10
4.32 Kg Semen 5,616 M.12
0.01 m3 Pasir Pasang 1,530 M.9
A.4.4.2.24 P-175 1.00 m2 Pemasangan finishing siar pasangan bata merah 26,970 0.2 .
0.15 OH Pekerja 12,750 L.1
0.08 OH Tukang Batu 7,500 L.3
0.01 OH Kepala Tukang 1,200 L.9
0.01 OH Mandor 1,480 L.10
3.11 Kg Semen 4,040 M.12
A.4.4.2.25. P-176 1.00 m2 Pemasangan Finishing siar pasangan conblock ekspose 12,870 0.1 .
0.07 OH Pekerja 5,950 L.1
0.04 OH Tukang Batu 3,500 L.3
0.00 OH Kepala Tukang 600 L.9
0.00 OH Mandor 740 L.10
1.60 Kg Semen 2,080 M.12
A.4.4.2.26. P-177 1.00 m2 Pemasangan finishing siar pasangan batu kali, campuran 56,827 0.5 .
0.30 OH Pekerja 25,500 L.1
0.15 OH Tukang Batu 15,000 L.3
0.02 OH Kepala Tukang 2,250 L.9
0.02 OH Mandor 2,775 L.10
6.34 Kg Semen 8,242 M.12
0.01 m3 Pasir Pasang 3,060 M.9
A.4.4.2.27. P-178 1.00 m2 Pemasangan acian. 34,575 0.3 .
0.20 OH Pekerja 17,000 L.1
0.10 OH Tukang Batu 10,000 L.3
0.01 OH Kepala Tukang 1,500 L.9
0.01 OH Mandor 1,850 L.10
3.25 Kg Semen 4,225 M.12
A.4.4.2.28. P-179 1.00 m2 Pemasangan plesteran dengan mortar siap pakai (MSP) 66,325 0.5 .
0.30 OH Pekerja 25,500 L.1
0.15 OH Tukang Batu 15,000 L.3
0.02 OH Kepala Tukang 2,250 L.9
0.02 OH Mandor 2,775 L.10
16.00 Kg Semen 20,800 M.12
A.4.4.2.29. P-180 1.00 m2 Pemasangan Acian dengan mortar siap pakai (MSP) 35,030 0.3 .
0.20 OH Pekerja 17,000 L.1
0.10 OH Tukang Batu 10,000 L.3
0.01 OH Kepala Tukang 1,500 L.9
0.01 OH Mandor 1,850 L.10
3.60 Kg Semen 4,680 M.12
A.4.4.3.1. P-181 1.00 m2 Pemasangan lantai ubin PC abu-abu ukuran 40cm x40c 102,100 0.4 .
0.25 OH Pekerja 21,250 L.1
0.13 OH Tukang Batu 12,500 L.3
0.01 OH Kepala tukang 1,950 L.9
0.01 OH Mandor 2,405 L.10
6.63 Bh ubin PC abu-abu ukuran 40cm x40cm 39,780 M.1409
9.80 kg Semen 12,740 M.12

Software RAB Exarch xPro 61/396


0.05 M3 Pasir Pasang 11,475 M.9
A.4.4.3.2. P-182 1.00 m2 Pemasangan lantai ubin PC abu-abu ukuran 30cm x30 c 115,995 0.4 .
0.25 OH Pekerja 21,250 L.1
0.13 OH Tukang Batu 12,500 L.3
0.01 OH Kepala tukang 1,950 L.9
0.01 OH Mandor 2,405 L.10
11.87 Bh ubin PC abu-abu ukuran 30cm x30 cm 53,415 M.1408
10.00 kg Semen 13,000 M.12
0.05 M3 Pasir Pasang 11,475 M.9
A.4.4.3.3. P-183 1.00 m2 Pemasangan lantai ubin PC abu-abu ukuran 20cm x20 c 145,635 0.4 .
0.27 OH Pekerja 22,950 L.1
0.14 OH Tukang Batu 13,500 L.3
0.01 OH Kepala tukang 2,100 L.9
0.01 OH Mandor 2,590 L.10
26.50 Bh ubin PC abu-abu ukuran 20cm x20 cm 79,500 M.1407
10.40 kg Semen 13,520 M.12
0.05 M3 Pasir Pasang 11,475 M.9
A.4.4.3.4. P-184 1.00 m2 Pemasangan lantai ubin warna ukuran 40cm x40 cm 177,955 0.4 .
0.25 OH Pekerja 21,250 L.1
0.13 OH Tukang Batu 12,500 L.3
0.01 OH Kepala tukang 1,950 L.9
0.01 OH Mandor 2,405 L.10
6.63 Bh ubin warna ukuran 40cm x40 cm 96,135 M.1424
9.80 kg Semen 12,740 M.12
1.30 Kg Semen Warna 19,500 M.13
0.05 M3 Pasir Pasang 11,475 M.9
A.4.4.3.5. P-185 1.00 m2 Pemasangan lantai ubin warna ukuran 30cm x30cm 234,805 0.4 .
0.26 OH Pekerja 22,100 L.1
0.13 OH Tukang Batu 13,000 L.3
0.01 OH Kepala tukang 1,950 L.9
0.01 OH Mandor 2,405 L.10
11.87 Bh ubin warna ukuran 30cm x30cm 148,375 M.1423
10.00 kg Semen 13,000 M.12
1.50 Kg Semen Warna 22,500 M.13
0.05 M3 Pasir Pasang 11,475 M.9
A.4.4.3.6. P-186 1.00 m2 Pemasangan lantai ubin warna ukuran 20cm x20cm 395,185 0.4 .
0.27 OH Pekerja 22,950 L.1
0.14 OH Tukang Batu 13,500 L.3
0.01 OH Kepala tukang 2,100 L.9
0.01 OH Mandor 2,590 L.10
26.50 Bh ubin warna ukuran 20cm x20cm 304,750 M.1422
10.40 kg Semen 13,520 M.12
1.62 Kg Semen Warna 24,300 M.13
0.05 M3 Pasir Pasang 11,475 M.9
A.4.4.3.7. P-187 1.00 m2 Pemasangan lantai ubin teraso ukuran 40cm x40cm 184,585 0.4 .
0.25 OH Pekerja 21,250 L.1
0.13 OH Tukang Batu 12,500 L.3
0.01 OH Kepala tukang 1,950 L.9
0.01 OH Mandor 2,405 L.10
6.63 Bh ubin teraso ukuran 40cm x40cm 102,765 M.1420
9.80 kg Semen 12,740 M.12
1.30 Kg Semen Warna 19,500 M.13
0.05 M3 Pasir Pasang 11,475 M.9
A.4.4.3.8. P-188 1.00 m2 Pemasangan lantai ubin teraso ukuran 30cm x30cm 246,675 0.4 .
0.26 OH Pekerja 22,100 L.1
0.13 OH Tukang Batu 13,000 L.3
0.01 OH Kepala tukang 1,950 L.9
0.01 OH Mandor 2,405 L.10
11.87 Bh ubin teraso ukuran 30cm x30cm 160,245 M.1419
10.00 kg Semen 13,000 M.12
1.50 Kg Semen Warna 22,500 M.13
0.05 M3 Pasir Pasang 11,475 M.9

Software RAB Exarch xPro 62/396


A.4.4.3.9. P-189 1.00 m2 Pemasangan lantai ubin granit ukuran 40cm x40cm 214,420 0.4 .
0.25 OH Pekerja 21,250 L.1
0.13 OH Tukang Batu 12,500 L.3
0.01 OH Kepala tukang 1,950 L.9
0.01 OH Mandor 2,405 L.10
6.63 Bh ubin granit ukuran 40cm x40cm 132,600 M.1404
9.80 kg Semen 12,740 M.12
1.30 Kg Semen Warna 19,500 M.13
0.05 M3 Pasir Pasang 11,475 M.9
A.4.4.3.10. P-190 1.00 m2 Pemasangan lantai ubin granit ukuran 30cm x30cm 276,350 0.4 .
0.26 OH Pekerja 22,100 L.1
0.13 OH Tukang Batu 13,000 L.3
0.01 OH Kepala tukang 1,950 L.9
0.01 OH Mandor 2,405 L.10
11.87 Bh ubin granit ukuran 30cm x30cm 189,920 M.1403
10.00 kg Semen 13,000 M.12
1.50 Kg Semen Warna 22,500 M.13
0.05 M3 Pasir Pasang 11,475 M.9
A.4.4.3.11. P-191 1.00 m2 Pemasangan lantai ubin teralux marmer ukuran 40cm x 161,380 0.4 .
0.25 OH Pekerja 21,250 L.1
0.13 OH Tukang Batu 12,500 L.3
0.01 OH Kepala tukang 1,950 L.9
0.01 OH Mandor 2,405 L.10
6.63 Bh ubin teralux marmer ukuran 40cm x40cm 79,560 M.1411
9.80 kg Semen 12,740 M.12
1.30 Kg Semen Warna 19,500 M.13
0.05 M3 Pasir Pasang 11,475 M.9
A.4.4.3.12. P-192 1.00 m2 Pemasangan lantai ubin teralux ukuran 30cm x30cm 252,610 0.4 .
0.26 OH Pekerja 22,100 L.1
0.13 OH Tukang Batu 13,000 L.3
0.01 OH Kepala tukang 1,950 L.9
0.01 OH Mandor 2,405 L.10
11.87 Bh ubin teralux ukuran 30cm x30cm 166,180 M.1412
10.00 kg Semen 13,000 M.12
1.50 Kg Semen Warna 22,500 M.13
0.05 M3 Pasir Pasang 11,475 M.9
A.4.4.3.13. P-193 1.00 m2 Pemasangan lantai ubin teralux marmer ukuran 60cm x 222,375 0.4 .
0.24 OH Pekerja 20,400 L.1
0.12 OH Tukang Batu 12,000 L.3
0.01 OH Kepala tukang 1,800 L.9
0.01 OH Mandor 2,220 L.10
3.10 Bh ubin teralux marmer ukuran 60cm x60cm 139,500 M.1417
9.60 kg Semen 12,480 M.12
1.50 Kg Semen Warna 22,500 M.13
0.05 M3 Pasir Pasang 11,475 M.9
A.4.4.3.14. P-194 1.00 m2 Pemasangan lantai ubin teralux marmer ukuran 40cm x 320,500 0.4 .
0.25 OH Pekerja 21,250 L.1
0.13 OH Tukang Batu 12,500 L.3
0.01 OH Kepala tukang 1,950 L.9
0.01 OH Mandor 2,405 L.10
6.63 Bh ubin teralux marmer ukuran 40cm x40cm 238,680 M.1416
9.80 kg Semen 12,740 M.12
1.30 Kg Semen Warna 19,500 M.13
0.05 M3 Pasir Pasang 11,475 M.9
A.4.4.3.15. P-195 1.00 m2 Pemasangan lantai ubin teralux marmer ukuran 30cm x 490,010 0.4 .
0.26 OH Pekerja 22,100 L.1
0.13 OH Tukang Batu 13,000 L.3
0.01 OH Kepala tukang 1,950 L.9
0.01 OH Mandor 2,405 L.10
11.87 Bh ubin teralux marmer ukuran 30cm x30cm 403,580 M.1415
10.00 kg Semen 13,000 M.12
1.50 Kg Semen Warna 22,500 M.13

Software RAB Exarch xPro 63/396


0.05 M3 Pasir Pasang 11,475 M.9
A.4.4.3.16. P-196 1.00 m1 Pemasangan plint ubin Pc abu-abu ukuran 15cm x 20cm 56,540 0.2 .
0.09 OH Pekerja 7,650 L.1
0.09 OH Tukang Batu 9,000 L.3
0.01 OH Kepala tukang 1,350 L.9
0.01 OH Mandor 925 L.10
5.30 Bh Plint ubin Pc abu-abu ukuran 15cm x 20cm 34,450 M.1379
1.65 kg Semen 2,145 M.12
0.00 M3 Pasir Pasang 1,020 M.9
A.4.4.3.17. P-197 1.00 m1 Pemasangan plint ubin Pc abu-abu ukuran 10cm x 30cm 38,952 0.2 .
0.09 OH Pekerja 7,650 L.1
0.09 OH Tukang Batu 9,000 L.3
0.01 OH Kepala tukang 1,350 L.9
0.01 OH Mandor 925 L.10
3.53 Bh Plint ubin Pc abu-abu ukuran 10cm x 30cm 17,650 M.1377
1.24 kg Semen 1,612 M.12
0.00 M3 Pasir Pasang 765 M.9
A.4.4.3.18. P-198 1.00 m1 Pemasangan plint ubin Pc abu-abu ukuran 10cm x 40cm 37,202 0.2 .
0.09 OH Pekerja 7,650 L.1
0.09 OH Tukang Batu 9,000 L.3
0.01 OH Kepala tukang 1,350 L.9
0.01 OH Mandor 925 L.10
2.65 Bh Plint ubin Pc abu-abu ukuran 10cm x 40cm 15,900 M.1378
1.24 kg Semen 1,612 M.12
0.00 M3 Pasir pasang 765 M.9
A.4.4.3.19. P-199 1.00 m1 Pemasangan plint ubin warna ukuran 10cm x 20cm 34,597 0.2 .
0.09 OH Pekerja 7,650 L.1
0.09 OH Tukang Batu 9,000 L.3
0.01 OH Kepala tukang 1,350 L.9
0.01 OH Mandor 925 L.10
2.65 Bh Plint ubin warna ukuran 10cm x 20cm 11,925 M.1391
1.14 kg Semen 1,482 M.12
0.10 Kg Semen Warna 1,500 M.13
0.00 M3 Pasir Pasang 765 M.9
A.4.4.3.20. P-200 1.00 m1 Pemasangan plint ubin warna ukuran 10cm x 30cm 40,322 0.2 .
0.09 OH Pekerja 7,650 L.1
0.09 OH Tukang Batu 9,000 L.3
0.01 OH Kepala tukang 1,350 L.9
0.01 OH Mandor 925 L.10
3.53 Bh Plint ubin warna ukuran 10cm x 30cm 17,650 M.1392
1.14 kg Semen 1,482 M.12
0.10 Kg Semen Warna 1,500 M.13
0.00 M3 Pasir Pasang 765 M.9
A.4.4.3.21. P-201 1.00 m1 Pemasangan plint ubin warna ukuran 10cm x 40cm 39,897 0.2 .
0.09 OH Pekerja 7,650 L.1
0.09 OH Tukang Batu 9,000 L.3
0.01 OH Kepala tukang 1,350 L.9
0.01 OH Mandor 925 L.10
2.65 Bh Plint ubin warna ukuran 10cm x 40cm 17,225 M.1393
1.14 kg Semen 1,482 M.12
0.10 Kg Semen Warna 1,500 M.13
0.00 M3 Pasir Pasang 765 M.9
A.4.4.3.22. P-202 1.00 m1 Pemasangan plint ubin teraso ukuran 10cm x 30cm 40,322 0.2 .
0.09 OH Pekerja 7,650 L.1
0.09 OH Tukang Batu 9,000 L.3
0.01 OH Kepala tukang 1,350 L.9
0.01 OH Mandor 925 L.10
3.53 Bh Plint ubin teraso ukuran 10cm x 30cm 17,650 M.1389
1.14 kg Semen 1,482 M.12
0.10 Kg Semen Warna 1,500 M.13
0.00 M3 Pasir Pasang 765 M.9
A.4.4.3.23. P-203 1.00 m1 Pemasangan plint ubin teraso ukuran 10cm x 40cm 41,222 0.2 .

Software RAB Exarch xPro 64/396


0.09 OH Pekerja 7,650 L.1
0.09 OH Tukang Batu 9,000 L.3
0.01 OH Kepala tukang 1,350 L.9
0.01 OH Mandor 925 L.10
2.65 Bh Plint ubin teraso ukuran 10cm x 40cm 18,550 M.1390
1.14 kg Semen 1,482 M.12
0.10 Kg Semen Warna 1,500 M.13
0.00 M3 Pasir Pasang 765 M.9
A.4.4.3.24. P-204 1.00 m1 Pemasangan plint ubin granit ukuran 10cm x 40cm 59,772 0.2 .
0.09 OH Pekerja 7,650 L.1
0.09 OH Tukang Batu 9,000 L.3
0.01 OH Kepala tukang 1,350 L.9
0.01 OH Mandor 925 L.10
2.65 Bh Plint ubin granit ukuran 10cm x 40cm 37,100 M.1374
1.14 kg Semen 1,482 M.12
0.10 Kg Semen Warna 1,500 M.13
0.00 M3 Pasir Pasang 765 M.9
A.4.4.3.25. P-205 1.00 m1 Pemasangan plint ubin granit ukuran 10cm x 30cm 68,562 0.2 .
0.09 OH Pekerja 7,650 L.1
0.09 OH Tukang Batu 9,000 L.3
0.01 OH Kepala tukang 1,350 L.9
0.01 OH Mandor 925 L.10
3.53 Bh Plint ubin granit ukuran 10cm x 30cm 45,890 M.1373
1.14 kg Semen 1,482 M.12
0.10 Kg Semen Warna 1,500 M.13
0.00 M3 Pasir Pasang 765 M.9
A.4.4.3.26. P-206 1.00 m1 Pemasangan plint ubin teralux kerang ukuran 10cm x 40 41,082 0.2 .
0.09 OH Pekerja 7,650 L.1
0.09 OH Tukang Batu 9,000 L.3
0.01 OH Kepala tukang 1,350 L.9
0.01 OH Mandor 925 L.10
2.63 Bh Plint ubin teralux kerang ukuran 10cm x 40cm 18,410 M.1383
1.14 kg Semen 1,482 M.12
0.10 Kg Semen Warna 1,500 M.13
0.00 M3 Pasir Pasang 765 M.9
A.4.4.3.27. P-207 1.00 m1 Pemasangan plint ubin teralux kerang ukuran 10cm x 30 45,264 0.2 .
0.09 OH Pekerja 7,650 L.1
0.09 OH Tukang Batu 9,000 L.3
0.01 OH Kepala tukang 1,350 L.9
0.01 OH Mandor 925 L.10
3.53 Bh Plint ubin teralux kerang ukuran 10cm x 30cm 22,592 M.1382
1.14 kg Semen 1,482 M.12
0.10 Kg Semen Warna 1,500 M.13
0.00 M3 Pasir Pasang 765 M.9
A.4.4.3.28. P-208 1.00 m1 Pemasangan plint ubin teralux marmer ukuran 10cm x 6 51,572 0.2 .
0.09 OH Pekerja 7,650 L.1
0.09 OH Tukang Batu 9,000 L.3
0.01 OH Kepala tukang 1,350 L.9
0.01 OH Mandor 925 L.10
1.70 Bh plint ubin teralux marmer ukuran 10cm x 60cm 28,900 M.1387
1.14 kg Semen 1,482 M.12
0.10 Kg Semen Warna 1,500 M.13
0.00 M3 Pasir Pasang 765 M.9
A.4.4.3.29. P-209 1.00 m1 Pemasangan plint ubin teralux marmer ukuran 10cm x 4 62,422 0.2 .
0.09 OH Pekerja 7,650 L.1
0.09 OH Tukang Batu 9,000 L.3
0.01 OH Kepala tukang 1,350 L.9
0.01 OH Mandor 925 L.10
2.65 Bh Plint ubin teralux marmer ukuran 10cm x 40cm 39,750 M.1386
1.14 kg Semen 1,482 M.12
0.10 Kg Semen Warna 1,500 M.13
0.00 M3 Pasir Pasang 765 M.9

Software RAB Exarch xPro 65/396


A.4.4.3.30. P-210 1.00 m1 Pemasangan plint ubin teralux marmer ukuran 10cm x 72,092 0.2 .
0.09 OH Pekerja 7,650 L.1
0.09 OH Tukang Batu 9,000 L.3
0.01 OH Kepala tukang 1,350 L.9
0.01 OH Mandor 925 L.10
3.53 Bh Plint ubin teralux marmer ukuran 10cm x 30cm 49,420 M.1385
1.14 kg Semen 1,482 M.12
0.10 Kg Semen Warna 1,500 M.13
0.00 M3 Pasir Pasang 765 M.9
A.4.4.3.31. P-211 1.00 m2 Pemasangan lantai teraso cor di tempat, tebal 3cm 56,292 0.6 .
0.36 OH Pekerja 30,600 L.1
0.18 OH Tukang Batu 18,000 L.3
0.02 OH Kepala tukang 2,700 L.9
0.02 OH Mandor 3,330 L.10
0.04 M3 Teraso cor di tempat, tebal 3cm 162 M.1487
0.10 Kg Semen warna 1,500 M.13
A.4.4.3.32. P-212 1.00 m2 Pemasangan lantai keramik artistik 10cm x 20cm 248,347 1.1 .
0.70 OH Pekerja 59,500 L.1
0.35 OH Tukang Batu 35,000 L.3
0.04 OH Kepala tukang 5,250 L.9
0.04 OH Mandor 6,475 L.10
1.05 m2 keramik artistik 10cm x 20cm 78,750 M.1354
8.19 Kg Semen 10,647 M.12
0.05 M3 Pasir pasang 11,475 M.9
2.75 Kg Semen warna 41,250 M.13
A.4.4.3.33. P-213 1.00 m2 Pemasangan lantai keramik artistik 10cm x 10cm atau 5 441,347 1.1 .
0.70 OH Pekerja 59,500 L.1
0.35 OH Tukang Batu 35,000 L.3
0.04 OH Kepala tukang 5,250 L.9
0.04 OH Mandor 6,475 L.10
106.00 Bh keramik artistik 10cm x 10cm atau 5cm x 20cm 265,000 M.1353
8.19 Kg Semen 10,647 M.12
0.05 M3 Pasir Pasang 11,475 M.9
3.20 Kg Semen Warna 48,000 M.13
A.4.4.3.34. P-214 1.00 m2 Pemasangan lantai keramik ukuran 33cm x 33cm 227,647 1.1 .
0.70 OH Pekerja 59,500 L.1
0.35 OH Tukang Batu 35,000 L.3
0.04 OH Kepala tukang 5,250 L.9
0.04 OH Mandor 6,475 L.10
10.00 Bh keramik ukuran 33cm x 33cm 75,000 M.1361
8.19 Kg Semen 10,647 M.12
0.05 M3 Pasir Pasang 11,475 M.9
1.62 Kg Semen Warna 24,300 M.13
A.4.4.3.35. P-215 1.00 m2 Pemasangan lantai keramik ukuran 30cm x 30cm 224,420 1.1 .
0.70 OH Pekerja 59,500 L.1
0.35 OH Tukang Batu 35,000 L.3
0.04 OH Kepala tukang 5,250 L.9
0.04 OH Mandor 6,475 L.10
11.87 Bh keramik ukuran 30cm x 30cm 71,220 M.1360
10.00 Kg Semen 13,000 M.12
0.05 M3 Pasir Pasang 11,475 M.9
1.50 Kg Semen Warna 22,500 M.13
A.4.4.3.36. P-216 1.00 m2 Pemasangan lantai keramik ukuran 20cm x 20cm 274,770 1.1 .
0.70 OH Pekerja 59,500 L.1
0.35 OH Tukang Batu 35,000 L.3
0.04 OH Kepala tukang 5,250 L.9
0.04 OH Mandor 6,475 L.10
26.50 Bh Keramik ukuran 20cm x 20cm 119,250 M.1359
10.40 Kg Semen 13,520 M.12
0.05 M3 Pasir Pasang 11,475 M.9
1.62 Kg Semen Warna 24,300 M.13
A.4.4.3.37. P-217 1.00 m2 keramik ukuran 10cm x 33cm untuk variasi/border 744,270 1.7 .

Software RAB Exarch xPro 66/396


1.05 OH Pekerja 89,250 L.1
0.53 OH Tukang Batu 52,500 L.3
0.05 OH Kepala tukang 7,950 L.9
0.05 OH Mandor 9,805 L.10
33.00 Bh Ubin keramik 495,000 M.1405
9.80 Kg Semen 12,740 M.12
0.05 M3 Pasir Pasang 11,475 M.9
4.37 Kg Semen Warna 65,550 M.13
A.4.4.3.38. P-218 1.00 m2 Pemasangan lantai keramik mozaik ukuran 30cm x 30cm 307,005 1.1 .
0.70 OH Pekerja 59,500 L.1
0.35 OH Tukang Batu 35,000 L.3
0.04 OH Kepala tukang 5,250 L.9
0.04 OH Mandor 6,475 L.10
11.87 Bh Keramik mozaik ukuran 30cm x 30cm 142,440 M.1358
14.15 Kg Semen 18,395 M.12
0.04 M3 Pasir Pasang 9,945 M.9
2.00 Kg Semen Warna 30,000 M.13
A.4.4.3.39. P-219 1.00 m1 Pemasangan plint keramik ukuran 10cm x 20cm 59,897 0.2 .
0.09 OH Pekerja 7,650 L.1
0.09 OH Tukang Batu 9,000 L.3
0.04 OH Kepala tukang 5,250 L.9
0.01 OH Mandor 925 L.10
5.30 Bh Plint keramik ukuran 10cm x 20cm 34,450 M.1369
1.14 Kg Semen 1,482 M.12
0.00 M3 Pasir Pasang 765 M.9
0.03 Kg Semen Warna 375 M.13
A.4.4.3.40. P-220 1.00 m1 Pemasangan plint keramik ukuran 10cm x 10cm 85,182 0.2 .
0.09 OH Pekerja 7,650 L.1
0.09 OH Tukang Batu 9,000 L.3
0.04 OH Kepala tukang 5,250 L.9
0.01 OH Mandor 925 L.10
10.60 Bh Plint keramik ukuran 10cm x 10cm 59,360 M.1368
1.14 Kg Semen 1,482 M.12
0.00 M3 Pasir Pasang 765 M.9
0.05 Kg Semen Warna 750 M.13
A.4.4.3.41. P-221 1.00 m1 Pemasangan plint keramik ukuran 5cm x 20cm 47,994 0.2 .
0.09 OH Pekerja 7,650 L.1
0.09 OH Tukang Batu 9,000 L.3
0.04 OH Kepala tukang 5,250 L.9
0.01 OH Mandor 925 L.10
5.30 Bh Plint keramik ukuran 5cm x 20cm 23,850 M.1370
0.57 Kg Semen 741 M.12
0.00 M3 Pasir Pasang 383 M.9
0.01 Kg Semen Warna 195 M.13
A.4.4.3.42. P-222 1.00 m1 Pemasangan plint internal cove artistik 5cm x 5cm x 20c 184,627 1.6 .
0.75 OH Pekerja 63,750 L.1
0.75 OH Tukang Batu 75,000 L.3
0.08 OH Kepala tukang 11,250 L.9
0.04 OH Mandor 7,030 L.10
5.30 Bh Plint internal cove artistik 5cm x 5cm x 20cm 23,850 M.1366
1.14 Kg Semen 1,482 M.12
0.00 M3 Pasir Pasang 765 M.9
0.10 Kg Semen Warna 1,500 M.13
A.4.4.3.43. P-223 1.00 m2 Pemasangan lantai marmer ukuran 100cm x 100cm 199,577 1.1 .
0.70 OH Pekerja 59,500 L.1
0.35 OH Tukang Batu 35,000 L.3
0.04 OH Kepala tukang 5,250 L.9
0.04 OH Mandor 6,475 L.10
1.06 Bh marmer ukuran 100cm x 100cm 61,480 M.1364
8.19 Kg Semen 10,647 M.12
0.05 M3 Pasir Pasang 11,475 M.9
0.65 Kg Semen Warna 9,750 M.13

Software RAB Exarch xPro 67/396


A.4.4.3.44. P-224 1.00 m2 Pemasangan lantai karpet 638,715 0.4 .
0.17 OH Pekerja 14,450 L.1
0.17 OH Tukang Kayu 17,000 L.6
0.02 OH Kepala tukang 2,550 L.9
0.01 OH Mandor 1,665 L.10
1.05 m2 Karpet 598,500 M.1312
0.35 Kg Lem kayu 4,550 M.1493
A.4.4.3.45. P-225 1.00 m2 Pemasangan underlayer (pelapis bawah karpet) 59,585 0.3 .
0.12 OH Pekerja 10,200 L.1
0.12 OH Tukang Kayu 12,000 L.6
0.01 OH Kepala tukang 1,800 L.9
0.01 OH Mandor 1,110 L.10
1.05 m2 underlayer (pelapis bawah karpet) 29,925 M.1324
0.35 Kg Lem kayu 4,550 M.1493
A.4.4.3.46. P-226 1.00 m2 Pemasangan lantai parquet kayu 128,725 1.1 .
0.70 OH Pekerja 59,500 L.1
0.35 OH Tukang Kayu 35,000 L.6
0.04 OH Kepala tukang 5,250 L.9
0.04 OH Mandor 6,475 L.10
1.05 m2 Parquet kayu 14,700 M.1315
0.60 Kg Lem kayu 7,800 M.1493
A.4.4.3.47. P-227 1.00 m2 Pemasangan lantai kayu gymfloor 418,525 1.1 .
0.70 OH Pekerja 59,500 L.1
0.35 OH Tukang Kayu 35,000 L.6
0.04 OH Kepala tukang 5,250 L.9
0.04 OH Mandor 6,475 L.10
1.05 m2 Parquet kayu gymfloor 304,500 M.1316
0.60 Kg Lem kayu 7,800 M.1493
A.4.4.3.48. P-228 1.00 m2 Pemasangan dinding porslen 11cm x 11cm 749,930 1.6 .
1.00 OH Pekerja 85,000 L.1
0.50 OH Tukang Batu 50,000 L.3
0.05 OH Kepala tukang 7,500 L.9
0.05 OH Mandor 9,250 L.10
86.00 Bh Porselen (11 x 11) cm 559,000 M.1396
9.30 Kg Semen 12,090 M.12
0.02 M3 Pasir Pasang 4,590 M.9
1.50 Kg Semen Warna 22,500 M.13
A.4.4.3.49. P-229 1.00 m2 Pemasangan dinding porslen 10cm x 20cm 459,505 1.4 .
0.90 OH Pekerja 76,500 L.1
0.45 OH Tukang Batu 45,000 L.3
0.05 OH Kepala tukang 6,750 L.9
0.05 OH Mandor 8,325 L.10
53.00 Bh Porselen Dinding 10x20 265,000 M.1397
9.30 Kg Semen 12,090 M.12
0.02 M3 Pasir Pasang 4,590 M.9
2.75 Kg Semen Warna 41,250 M.13
A.4.4.3.50. P-230 1.00 m2 Pemasangan dinding porslen 20cm x 20cm 364,355 1.4 .
0.90 OH Pekerja 76,500 L.1
0.45 OH Tukang Batu 45,000 L.3
0.05 OH Kepala tukang 6,750 L.9
0.05 OH Mandor 8,325 L.10
26.00 Bh Porselen Dinding 20x20 182,000 M.1398
9.30 Kg Semen 12,090 M.12
0.02 M3 Pasir Pasang 4,590 M.9
1.94 Kg Semen Warna 29,100 M.13
A.4.4.3.51. P-231 1.00 m2 Pemasangan dinding keramik artistik 10cm x 20cm 267,105 1.4 .
0.90 OH Pekerja 76,500 L.1
0.45 OH Tukang Batu 45,000 L.3
0.05 OH Kepala tukang 6,750 L.9
0.05 OH Mandor 8,325 L.10
1.10 m2 Keramik Dinding artistik 72,600 M.1357
9.30 Kg Semen 12,090 M.12

Software RAB Exarch xPro 68/396


0.02 M3 Pasir Pasang 4,590 M.9
2.75 Kg Semen Warna 41,250 M.13
A.4.4.3.52. P-232 1.00 m2 Pemasangan dinding keramik artistik 5cm x 20cm 266,055 1.4 .
0.90 OH Pekerja 76,500 L.1
0.45 OH Tukang Batu 45,000 L.3
0.05 OH Kepala tukang 6,750 L.9
0.05 OH Mandor 8,325 L.10
1.05 m2 Keramik Dinding artistik 69,300 M.1357
9.30 Kg Semen 12,090 M.12
0.02 M3 Pasir Pasang 4,590 M.9
2.90 Kg Semen Warna 43,500 M.13
A.4.4.3.53. P-233 1.00 m2 Pemasangan dinding keramik 10cm x 20cm 283,755 1.4 .
0.90 OH Pekerja 76,500 L.1
0.45 OH Tukang Batu 45,000 L.3
0.05 OH Kepala tukang 6,750 L.9
0.05 OH Mandor 8,325 L.10
1.05 m2 keramik Dinding 10cm x 20cm 89,250 M.1355
9.30 Kg Semen 12,090 M.12
0.02 M3 Pasir Pasang 4,590 M.9
2.75 Kg Semen Warna 41,250 M.13
A.4.4.3.54. P-234 1.00 m2 Pemasangan dinding keramik 20cm x 20cm 251,105 1.4 .
0.90 OH Pekerja 76,500 L.1
0.45 OH Tukang Batu 45,000 L.3
0.05 OH Kepala tukang 6,750 L.9
0.05 OH Mandor 8,325 L.10
1.10 m2 keramik Dinding 20cm x 20cm 68,750 M.1356
9.30 Kg Semen 12,090 M.12
0.02 M3 Pasir Pasang 4,590 M.9
1.94 Kg Semen Warna 29,100 M.13
A.4.4.3.55. P-235 1.00 m2 Pemasangan dinding marmer 100cm x 100cm 486,160 2.1 .
1.30 OH Pekerja 110,500 L.1
0.65 OH Tukang Batu 65,000 L.3
0.07 OH Kepala tukang 9,750 L.9
0.07 OH Mandor 12,025 L.10
1.06 Bh marmer ukuran 100cm x 100cm 61,480 M.1364
12.44 Kg Semen 16,172 M.12
0.03 M3 Semen 33 M.12
0.65 Kg Pasir Pasang 165,750 M.9
3.03 Bh Semen Warna 45,450 M.13
A.4.4.3.56. P-236 1.00 m2 Pemasangan dinding bata pelapis 3cm x 7cm x 24cm 262,797 1.6 .
1.00 OH Pekerja 85,000 L.1
0.50 OH Tukang Batu 50,000 L.3
0.05 OH Kepala tukang 7,500 L.9
0.05 OH Mandor 9,250 L.10
63.00 Bh Bata pelapis Dinding 3cm x 7cm x 24cm 47,250 M.1005
12.44 Kg Semen 16,172 M.12
0.03 M3 Pasir Pasang 6,375 M.9
2.75 Kg Semen Warna 41,250 M.13
A.4.4.3.57. P-237 1.00 m2 Pemasangan dinding batu paras 143,625 1.1 .
0.70 OH Pekerja 59,500 L.1
0.35 OH Tukang Batu 35,000 L.3
0.04 OH Kepala tukang 5,250 L.9
0.04 OH Mandor 6,475 L.10
1.10 Bh Batu paras Dinding 13,200 M.1010
11.75 Kg Semen 15,275 M.12
0.04 M3 Pasir Pasang 8,925 M.9
A.4.4.3.58. P-238 1.00 m2 Pemasangan dinding batu tempel hitam 333,925 1.1 .
0.70 OH Pekerja 59,500 L.1
0.35 OH Tukang Batu 35,000 L.3
0.04 OH Kepala tukang 5,250 L.9
0.04 OH Mandor 6,475 L.10
1.10 m2 Batu alam / tempel 203,500 M.4

Software RAB Exarch xPro 69/396


11.75 Kg Semen 15,275 M.12
0.04 M3 Pasir Pasang 8,925 M.9
A.4.4.3.59. P-239 1.00 m2 Pemasangan lantai vynil ukuran 30cm x 30cm 257,999 0.3 .
0.15 OH Pekerja 12,750 L.1
0.15 OH Tukang Batu 15,000 L.3
0.02 OH Kepala tukang 2,250 L.9
0.01 OH Mandor 1,480 L.10
11.87 Bh Vinyl 221,969 M.1351
0.35 Kg Lem kayu 4,550 M.1493
A.4.4.3.60. P-240 1.00 m2 Pemasangan wallpaper lebar 50 cm 130,920 0.5 .
0.35 OH Pekerja 29,750 L.1
0.18 OH Tukang Batu 17,500 L.3
0.02 OH Kepala tukang 2,550 L.9
0.00 OH Mandor 370 L.10
2.20 m Wallpaper 77,000 M.1325
0.25 Kg Lem Putih 3,750 M.1494
A.4.4.3.61. P-241 1.00 m2 Pemasangan floor harderner 43,860 0.3 .
0.12 OH Pekerja 10,200 L.1
0.12 OH Tukang Batu 12,000 L.3
0.01 OH Kepala tukang 1,800 L.9
0.01 OH Mandor 1,110 L.10
5.00 Kg Floor hardener 18,750 M.1524
A.4.4.3.62. P-242 1.00 m1 Pemasangan plint vynil 15cm x 30cm 61,780 0.2 .
0.08 OH Pekerja 6,800 L.1
0.08 OH Tukang Batu 8,000 L.3
0.01 OH Kepala tukang 1,200 L.9
0.00 OH Mandor 740 L.10
1.76 Bh plint vynil 15cm x 30cm 44,000 M.1394
0.08 Kg Lem kayu 1,040 M.1493
A.4.4.3.63. P-243 1.00 m1 Pemasangan plint kayu tebal 2 cm lebar 10 cm 43,823 0.3 .
0.12 OH Pekerja 10,200 L.1
0.12 OH Tukang Batu 12,000 L.3
0.01 OH Kepala tukang 1,800 L.9
0.01 OH Mandor 1,110 L.10
0.00 M3 Kayu Papan kelas I 18,675 M.1085
0.05 Kg Paku sekrup 38 M.112
A.4.4.3.64. P-244 1.00 m2 Pemasangan paving block natural tebal 6 cm 220,313 0.5 .
0.25 OH Pekerja 21,250 L.1
0.25 OH Tukang Kayu 25,000 L.6
0.03 OH Kepala tukang 3,750 L.9
0.00 OH Mandor 463 L.10
1.01 M2 Paving block 6 cm 136,350 M.118
0.05 M3 Pasir beton 12,500 M.8
0.10 Ls Alat Bantu Kerja Paving Blok 21,000 A.1
A.4.4.3.65. P-245 1.00 m2 Pemasangan paving block natural tebal 8 cm 92,498 0.5 .
0.25 OH Pekerja 21,250 L.1
0.25 OH Tukang Kayu 25,000 L.6
0.03 OH Kepala tukang 3,750 L.9
0.00 OH Mandor 463 L.10
1.01 M2 Paving block 8 cm natural 3,535 M.1485
0.07 M3 Pasir beton 17,500 M.8
0.10 Ls Alat Bantu Kerja Paving Blok 21,000 A.1
A.4.4.3.66. P-246 1.00 m2 Pemasangan paving block berwarna tebal 6 cm 215,263 0.5 .
0.25 OH Pekerja 21,250 L.1
0.25 OH Tukang Kayu 25,000 L.6
0.03 OH Kepala tukang 3,750 L.9
0.00 OH Mandor 463 L.10
1.01 M2 Paving block 6cm berwarna 131,300 M.1484
0.05 M3 Pasir beton 12,500 M.8
0.10 Ls Alat Bantu Kerja Paving Blok 21,000 A.1
A.4.4.3.67. P-247 1.00 m2 Pemasangan paving block berwarna tebal 8 cm 200,063 0.5 .
0.25 OH Pekerja 21,250 L.1

Software RAB Exarch xPro 70/396


0.25 OH Tukang Kayu 25,000 L.6
0.03 OH Kepala tukang 3,750 L.9
0.00 OH Mandor 463 L.10
1.01 M2 Paving block 8 cm berwarna 111,100 M.1483
0.07 M3 Pasir beton 17,500 M.8
0.10 Ls Alat Bantu Kerja Paving Blok 21,000 A.1
A.4.4.3.68. P-248 1.00 m2 Pemasangan Aluminium Composite Panel 143,525 0.2 .
0.15 OH Pekerja 12,750 L.1
0.08 OH Tukang Besi 7,500 L.4
0.01 OH Kepala Tukang 1,200 L.9
0.01 OH Mandor 1,480 L.10
0.37 Lbr Aluminium Composite Panel 110,595 M.1104
20.00 bh Screw 10,000 M.113
A.4.5.1.1. P-249 1.00 m2 Pemasangan langit-langit asbes semen, tebal 4 mm, 5 99,520 0.1 .
0.03 OH Pekerja 2,550 L.1
0.07 OH Tukang kayu 7,000 L.6
0.01 OH Kepala tukang 1,050 L.9
0.00 OH Mandor 740 L.10
1.10 m2 Asbes semen 88,000 M.1300
0.01 kg Paku tripleks 180 M.1143
A.4.5.1.2. P-250 1.00 m2 Pemasangan langit-langit akustik ukuran (30 x 30) cm 446,010 0.3 .
0.12 OH Pekerja 10,200 L.1
0.12 OH Tukang kayu 12,000 L.6
0.01 OH Kepala tukang 1,800 L.9
0.01 OH Mandor 1,110 L.10
12.00 Lbr Akustik ukuran 30 x 30 cm 420,000 M.1298
0.05 kg Paku tripleks 900 M.1143
A.4.5.1.3. P-251 1.00 m2 Pemasangan langit-langit akustik ukuran (30 x 60) cm 345,010 0.3 .
0.12 OH Pekerja 10,200 L.1
0.12 OH Tukang kayu 12,000 L.6
0.01 OH Kepala tukang 1,800 L.9
0.01 OH Mandor 1,110 L.10
5.80 Lbr Akustik ukuran 30 x 60 cm 319,000 M.1299
0.05 kg Paku tripleks 900 M.1143
A.4.5.1.4. P-252 1.00 m2 Pemasangan langit-langit akustik ukuran (60 x 120) cm 213,825 0.2 .
0.10 OH Pekerja 8,500 L.1
0.10 OH Tukang kayu 10,000 L.6
0.01 OH Kepala tukang 1,500 L.9
0.01 OH Mandor 925 L.10
1.50 Lbr Akustik Uk. 60 cm x 120 cm 192,000 M.1297
0.05 kg Paku tripleks 900 M.1143
A.4.5.1.5. P-253 1.00 m2 Pemasangan langit-langit tripleks ukuran (120 x 240) cm 53,340 0.2 .
0.10 OH Pekerja 8,500 L.1
0.10 OH Tukang kayu 10,000 L.6
0.01 OH Kepala tukang 1,500 L.9
0.01 OH Mandor 925 L.10
0.38 Lbr Tripleks 31,875 M.62
0.03 kg Paku tripleks 540 M.1143
A.4.5.1.6. P-254 1.00 m2 Pemasangan langit-langit lambrisering kayu, tebal 9 mm 220,080 1.7 .
0.80 OH Pekerja 68,000 L.1
0.80 OH Tukang kayu 80,000 L.6
0.08 OH Kepala tukang 12,000 L.9
0.04 OH Mandor 7,400 L.10
0.02 m3 Kayu Papan 3/20 52,500 M.1084
0.01 kg Paku tripleks 180 M.1143
A.4.5.1.7. P-255 1.00 m2 Pemasangan langit-langit gypsum board ukuran (120x24 46,926 0.2 .
0.10 OH Pekerja 8,500 L.1
0.05 OH Tukang kayu 5,000 L.6
0.01 OH Kepala tukang 750 L.9
0.01 OH Mandor 925 L.10
0.36 Lbr Gypsum board 9 mm 31,668 M.56
0.11 kg Paku sekrup 83 M.112

Software RAB Exarch xPro 71/396


A.4.5.1.8. P-256 1.00 m2 Pemasangan langit-langit akustik ukuran (60 x 120) 361,470 1.1 .
0.50 OH Pekerja 42,500 L.1
0.50 OH Tukang kayu 50,000 L.6
0.05 OH Kepala tukang 7,500 L.9
0.03 OH Mandor 4,625 L.10
3.60 m Profil Alluminium "T" 43,920 M.1149
0.15 kg Kawat dia 4 mm 5,175 M.1121
1.05 bh Baut Ramset / Dina Bolt 15,750 M.109
1.50 Lbr Akustik Uk. 60 cm x 120 cm 192,000 M.1297
A.4.5.1.9. P-257 1.00 m1 Pemasangan list langit-langit kayu profil 13,819 0.1 .
0.05 OH Pekerja 4,250 L.1
0.05 OH Tukang Kayu 5,000 L.6
0.01 OH Kepala tukang 750 L.9
0.00 OH Mandor 555 L.10
1.05 m List kayu profil 3,014 M.140
0.01 kg Paku Biasa 2" - 5" 250 M.111
A.4.5.1.10. P-258 1.00 m2 Pemasangan Plafond PVC 178,825 0.5 .
0.15 OH Pekerja 12,750 L.1
0.25 OH Tukang Kayu 25,000 L.6
0.03 OH Kepala tukang 3,750 L.9
0.08 OH Mandor 13,875 L.10
1.05 m2 Plafond PVC 114,450 M.1318
18.00 bh Screw 9,000 M.113
A.4.5.1.10. P-259 1.00 m2 Pemasangan List Plafond PVC 53,875 0.2 .
0.10 OH Pekerja 8,500 L.1
0.05 OH Tukang Kayu 5,000 L.6
0.01 OH Kepala tukang 750 L.9
0.01 OH Mandor 925 L.10
1.05 M' List Plafon 35,700 M.57
6.00 bh Screw 3,000 M.113
A.4.5.2.1. P-260 1.00 m2 Pemasangan atap genteng palentong kecil 85,355 0.2 .
0.15 OH Pekerja 12,750 L.1
0.08 OH Tukang Kayu 7,500 L.6
0.01 OH Kepala tukang 1,125 L.9
0.01 OH Mandor 1,480 L.10
25.00 Bh Genteng palentong 62,500 M.1441
A.4.5.2.2. P-261 1.00 m2 Pemasangan atap genteng kodok glazuur 60,430 0.2 .
0.15 OH Pekerja 12,750 L.1
0.08 OH Tukang Kayu 7,500 L.6
0.01 OH Kepala tukang 1,200 L.9
0.01 OH Mandor 1,480 L.10
25.00 Bh Genteng kodok 37,500 M.1439
A.4.5.2.3. P-262 1.00 m2 Pemasangan atap genteng palentong besar/super 40,930 0.2 .
0.15 OH Pekerja 12,750 L.1
0.08 OH Tukang Kayu 7,500 L.6
0.01 OH Kepala tukang 1,200 L.9
0.01 OH Mandor 1,480 L.10
12.00 Bh Genteng kodok 18,000 M.1439
A.4.5.2.4. P-263 1.00 m1 Pemasangan bubung genteng palentong 100,930 0.6 .
0.40 OH Pekerja 34,000 L.1
0.20 OH Tukang Kayu 20,000 L.6
0.02 OH Kepala tukang 3,000 L.9
0.00 OH Mandor 370 L.10
5.00 Bh Genteng bubung 25,000 M.1435
8.00 Kg Semen 10,400 M.12
0.03 M3 Pasir Pasang 8,160 M.9
A.4.5.2.5. P-264 1.00 m1 Pemasangan bubung genteng kodok glazuur 100,930 0.6 .
0.40 OH Pekerja 34,000 L.1
0.20 OH Tukang Kayu 20,000 L.6
0.02 OH Kepala tukang 3,000 L.9
0.00 OH Mandor 370 L.10
5.00 Bh Genteng bubung 25,000 M.1435

Software RAB Exarch xPro 72/396


8.00 Kg Semen 10,400 M.12
0.03 M3 Pasir Pasang 8,160 M.9
A.4.5.2.6. P-265 1.00 m1 Pemasangan bubung genteng palentong besar 95,930 0.6 .
0.40 OH Pekerja 34,000 L.1
0.20 OH Tukang Kayu 20,000 L.6
0.02 OH Kepala tukang 3,000 L.9
0.00 OH Mandor 370 L.10
4.00 Bh Genteng bubung 20,000 M.1435
8.00 Kg Semen 10,400 M.12
0.03 M3 Pasir Pasang 8,160 M.9
A.4.5.2.7. P-266 1.00 m2 Pemasangan roof light fibreglass 90x180 94,195 0.2 .
0.14 OH Pekerja 11,900 L.1
0.07 OH Tukang Kayu 6,700 L.6
0.01 OH Kepala tukang 1,050 L.9
0.01 OH Mandor 1,295 L.10
0.60 Lbr Rooflight 90x180 72,000 M.1455
0.05 Kg Paku Biasa 2" - 5" 1,250 M.111
A.4.5.2.8. P-267 1.00 m2 Pemasangan atap asbes gelombang 0,92mx2,5m x 5mm 77,020 0.2 .
0.14 OH Pekerja 11,900 L.1
0.08 OH Tukang Kayu 7,500 L.6
0.01 OH Kepala tukang 1,200 L.9
0.01 OH Mandor 1,480 L.10
0.50 Lbr Asbes gelombang 92x250 53,500 M.1303
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
A.4.5.2.9. P-268 1.00 m2 Pemasangan atap asbes gelombang 0,92mx2,25m x 5mm 87,720 0.2 .
0.14 OH Pekerja 11,900 L.1
0.08 OH Tukang Kayu 7,500 L.6
0.01 OH Kepala tukang 1,200 L.9
0.01 OH Mandor 1,480 L.10
0.60 Lbr Asbes gelombang 92x250 64,200 M.1303
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
A.4.5.2.10. P-269 1.00 m2 Pemasangan atap asbes gelombang 0,92mx2,00m x 5m 86,885 0.2 .
0.14 OH Pekerja 11,900 L.1
0.07 OH Tukang Kayu 7,000 L.6
0.01 OH Kepala tukang 1,050 L.9
0.01 OH Mandor 1,295 L.10
0.60 Lbr Asbes gelombang 92x250 64,200 M.1303
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
A.4.5.2.11. P-270 1.00 m2 Pemasangan atap asbes gelombang 0,92mx1.80m x 5mm 102,935 0.2 .
0.14 OH Pekerja 11,900 L.1
0.07 OH Tukang Kayu 7,000 L.6
0.01 OH Kepala tukang 1,050 L.9
0.01 OH Mandor 1,295 L.10
0.75 Lbr Asbes gelombang 92x250 80,250 M.1303
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
A.4.5.2.12. P-271 1.00 m2 Pemasangan atap asbes gelombang 1.05mx3.00m x 4mm 60,135 0.2 .
0.14 OH Pekerja 11,900 L.1
0.07 OH Tukang Kayu 7,000 L.6
0.01 OH Kepala tukang 1,050 L.9
0.01 OH Mandor 1,295 L.10
0.35 Lbr Asbes gelombang 92x250 37,450 M.1303
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
A.4.5.2.13. P-272 1.00 m2 Pemasangan atap asbes gelombang 1.05mx2.70m x 4mm 67,625 0.2 .
0.14 OH Pekerja 11,900 L.1
0.07 OH Tukang Kayu 7,000 L.6
0.01 OH Kepala tukang 1,050 L.9
0.01 OH Mandor 1,295 L.10
0.42 Lbr Asbes gelombang 92x250 44,940 M.1303
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
A.4.5.2.14. P-273 1.00 m2 Pemasangan atap asbes gelombang 1.05mx2.40m x 4mm 69,765 0.2 .
0.14 OH Pekerja 11,900 L.1
0.07 OH Tukang Kayu 7,000 L.6

Software RAB Exarch xPro 73/396


0.01 OH Kepala tukang 1,050 L.9
0.01 OH Mandor 1,295 L.10
0.44 Lbr Asbes gelombang 92x250 47,080 M.1303
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
A.4.5.2.15. P-274 1.00 m2 Pemasangan atap asbes gelombang 1.05mx2.10m x 4mm 77,255 0.2 .
0.14 OH Pekerja 11,900 L.1
0.07 OH Tukang Kayu 7,000 L.6
0.01 OH Kepala tukang 1,050 L.9
0.01 OH Mandor 1,295 L.10
0.51 Lbr Asbes gelombang 92x250 54,570 M.1303
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
A.4.5.2.16. P-275 1.00 m2 Pemasangan atap asbes gelombang 1.05mx1.50m x 4m 108,285 0.2 .
0.14 OH Pekerja 11,900 L.1
0.07 OH Tukang Kayu 7,000 L.6
0.01 OH Kepala tukang 1,050 L.9
0.01 OH Mandor 1,295 L.10
0.80 Lbr Asbes gelombang 92x250 85,600 M.1303
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
A.4.5.2.17. P-276 1.00 m2 Pemasangan atap asbes gelombang 1.08mx3.00m x 6m 62,275 0.2 .
0.14 OH Pekerja 11,900 L.1
0.07 OH Tukang Kayu 7,000 L.6
0.01 OH Kepala tukang 1,050 L.9
0.01 OH Mandor 1,295 L.10
0.37 Lbr Asbes gelombang 92x250 39,590 M.1303
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
A.4.5.2.18. P-277 1.00 m2 Pemasangan atap asbes gelombang 1.08mx2.70m x 6m 63,345 0.2 .
0.14 OH Pekerja 11,900 L.1
0.07 OH Tukang Kayu 7,000 L.6
0.01 OH Kepala tukang 1,050 L.9
0.01 OH Mandor 1,295 L.10
0.38 Lbr Asbes gelombang 92x250 40,660 M.1303
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
A.4.5.2.19. P-278 1.00 m2 Pemasangan atap asbes gelombang 1.08mx2.40m x 6mm 71,905 0.2 .
0.14 OH Pekerja 11,900 L.1
0.07 OH Tukang Kayu 7,000 L.6
0.01 OH Kepala tukang 1,050 L.9
0.01 OH Mandor 1,295 L.10
0.46 Lbr Asbes gelombang 92x250 49,220 M.1303
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
A.4.5.2.20. P-279 1.00 m2 Pemasangan atap asbes gelombang 1.08mx2.10m x 6m 75,115 0.2 .
0.14 OH Pekerja 11,900 L.1
0.07 OH Tukang Kayu 7,000 L.6
0.01 OH Kepala tukang 1,050 L.9
0.01 OH Mandor 1,295 L.10
0.49 Lbr Asbes gelombang 92x250 52,430 M.1303
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
A.4.5.2.21. P-280 1.00 m2 Pemasangan atap asbes gelombang 1.08mx1.80m x 6mm 83,675 0.2 .
0.14 OH Pekerja 11,900 L.1
0.07 OH Tukang Kayu 7,000 L.6
0.01 OH Kepala tukang 1,050 L.9
0.01 OH Mandor 1,295 L.10
0.57 Lbr Asbes gelombang 92x250 60,990 M.1303
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
A.4.5.2.22. P-281 1.00 m1 Pemasangan bubung stel gelombang 0,92m 65,230 0.2 .
0.08 OH Pekerja 7,140 L.1
0.13 OH Tukang Kayu 12,500 L.6
0.01 OH Kepala tukang 1,950 L.9
0.00 OH Mandor 740 L.10
2.40 Lbr Bubung stel gel. 38,400 M.1427
6.00 Bh Paku sekrup 4,500 M.112
A.4.5.2.23. P-282 1.00 m1 Pemasangan bubung stel gelombang 1,05m 60,430 0.2 .
0.08 OH Pekerja 7,140 L.1

Software RAB Exarch xPro 74/396


0.13 OH Tukang Kayu 12,500 L.6
0.01 OH Kepala tukang 1,950 L.9
0.00 OH Mandor 740 L.10
2.10 Lbr Bubung stel gel. 33,600 M.1427
6.00 Bh Paku sekrup 4,500 M.112
A.4.5.2.24. P-283 1.00 m1 Pemasangan bubung stel gelombang 1,08m 59,630 0.2 .
0.08 OH Pekerja 7,140 L.1
0.13 OH Tukang Kayu 12,500 L.6
0.01 OH Kepala tukang 1,950 L.9
0.00 OH Mandor 740 L.10
2.05 Lbr Bubung stel gel. 32,800 M.1427
6.00 Bh Paku sekrup 4,500 M.112
A.4.5.2.25. P-284 1.00 m1 Pemasangan Nok paten 0,92m 76,630 0.2 .
0.08 OH Pekerja 7,140 L.1
0.13 OH Tukang Kayu 12,500 L.6
0.01 OH Kepala tukang 1,950 L.9
0.00 OH Mandor 740 L.10
1.20 Lbr Nok Paten 49,800 M.1449
6.00 Bh Paku sekrup 4,500 M.112
A.4.5.2.26. P-285 1.00 m1 Pemasangan Nok paten 1,05m 76,630 0.2 .
0.08 OH Pekerja 7,140 L.1
0.13 OH Tukang Kayu 12,500 L.6
0.01 OH Kepala tukang 1,950 L.9
0.00 OH Mandor 740 L.10
1.20 Lbr Nok Paten 49,800 M.1449
6.00 Bh Paku sekrup 4,500 M.112
A.4.5.2.27. P-286 1.00 m1 Pemasangan Nok paten 1,08m 76,630 0.2 .
0.08 OH Pekerja 7,140 L.1
0.13 OH Tukang Kayu 12,500 L.6
0.01 OH Kepala tukang 1,950 L.9
0.00 OH Mandor 740 L.10
1.20 Lbr Nok Paten 49,800 M.1449
6.00 Bh Paku sekrup 4,500 M.112
A.4.5.2.28. P-287 1.00 m1 Pemasangan nok stel rata 0,92m 76,340 0.3 .
0.10 OH Pekerja 8,500 L.1
0.15 OH Tukang Kayu 15,000 L.6
0.01 OH Kepala tukang 1,950 L.9
0.00 OH Mandor 740 L.10
1.10 Lbr Nok Paten 45,650 M.1449
6.00 Bh Paku sekrup 4,500 M.112
A.4.5.2.29. P-288 1.00 m1 Pemasangan nok stel rata 1,05m 72,480 0.2 .
0.08 OH Pekerja 7,140 L.1
0.13 OH Tukang Kayu 12,500 L.6
0.01 OH Kepala tukang 1,950 L.9
0.00 OH Mandor 740 L.10
1.10 Lbr Nok Paten 45,650 M.1449
6.00 Bh Paku sekrup 4,500 M.112
A.4.5.2.30. P-289 1.00 m2 Pemasangan genteng beton 60,800 0.3 .
0.20 OH Pekerja 17,000 L.1
0.10 OH Tukang Kayu 10,000 L.6
0.01 OH Kepala tukang 1,500 L.9
0.01 OH Mandor 1,850 L.10
11.00 Bh Genteng beton 29,700 M.1432
0.03 Kg Paku Biasa 2" - 5" 750 M.111
A.4.5.2.31. P-290 1.00 m2 Pemasangan genteng aspal 132,370 0.5 .
0.20 OH Pekerja 17,000 L.1
0.30 OH Tukang Kayu 30,000 L.6
0.00 OH Kepala tukang 450 L.9
0.01 OH Mandor 1,850 L.10
6.90 Bh Genteng aspal 19,320 M.1431
0.35 Lbr Plywood 120x240 tbl. 6 mm 45,500 M.59
0.03 Kg Paku Biasa 2" - 5" 750 M.111

Software RAB Exarch xPro 75/396


0.50 Bh Plastic aerator 17,500 M.1319
A.4.5.2.32. P-291 1.00 m2 Pemasangan genteng metal ukuran 80 x 100 atap pelana 78,885 0.3 .
0.20 OH Pekerja 17,000 L.1
0.10 OH Tukang Kayu 10,000 L.6
0.01 OH Kepala tukang 1,500 L.9
0.00 OH Mandor 185 L.10
1.30 Bh Genteng metal 45,500 M.1440
0.20 Kg Paku Biasa ½" - 1" 4,700 M.110
A.4.5.2.33. P-292 1.00 m2 Pemasangan genteng metal ukuran 80 x 100 atap Jurai 103,385 0.3 .
0.20 OH Pekerja 17,000 L.1
0.10 OH Tukang Kayu 10,000 L.6
0.01 OH Kepala tukang 1,500 L.9
0.00 OH Mandor 185 L.10
2.00 Bh Genteng metal 70,000 M.1440
0.20 Kg Paku Biasa ½" - 1" 4,700 M.110
A.4.5.2.34. P-293 1.00 m2 Pemasangan atap sirap kayu 124,340 0.4 .
0.17 OH Pekerja 14,110 L.1
0.25 OH Tukang Kayu 25,000 L.6
0.03 OH Kepala tukang 3,750 L.9
0.01 OH Mandor 1,480 L.10
30.00 Bh Sirap kayu 75,000 M.1456
0.20 Kg Paku Biasa 2" - 5" 5,000 M.111
A.4.5.2.35. P-294 1.00 m1 Pemasangan nok genteng beton 151,650 0.6 .
0.40 OH Pekerja 34,000 L.1
0.20 OH Tukang Kayu 20,000 L.6
0.02 OH Kepala tukang 3,000 L.9
0.02 OH Mandor 3,700 L.10
3.50 Bh nok genteng beton 52,500 M.1446
0.05 Kg Paku Biasa 2" - 5" 1,250 M.111
10.80 Kg Semen 14,040 M.12
0.03 M3 Pasir Pasang 8,160 M.9
1.00 Kg Semen warna 15,000 M.13
A.4.5.2.36. P-295 1.00 m1 Pemasangan Nok genteng aspal 103,985 0.4 .
0.13 OH Pekerja 10,625 L.1
0.25 OH Tukang Kayu 25,000 L.6
0.03 OH Kepala tukang 3,750 L.9
0.01 OH Mandor 1,110 L.10
2.00 Bh nok genteng aspal 50,000 M.1445
0.05 Kg Paku Biasa 2" - 5" 1,250 M.111
0.00 M3 Kayu balok borneo 12,250 M.1068
A.4.5.2.37. P-296 1.00 m1 Pemasangan nok genteng metal 133,455 0.4 .
0.25 OH Pekerja 21,250 L.1
0.15 OH Tukang Kayu 15,000 L.6
0.02 OH Kepala tukang 2,250 L.9
0.01 OH Mandor 2,405 L.10
1.10 Bh nok genteng metal 91,300 M.37
0.05 Kg Paku Biasa 2" - 5" 1,250 M.111
A.4.5.2.38. P-297 1.00 m1 Pemasangan Nok sirap 70,985 0.4 .
0.13 OH Pekerja 10,625 L.1
0.25 OH Tukang Kayu 25,000 L.6
0.03 OH Kepala tukang 3,750 L.9
0.01 OH Mandor 1,110 L.10
0.40 Lbr Seng Gelombang 3" x 6" BJLS 28 28,000 M.61
0.05 Kg Paku Biasa 2" - 5" 1,250 M.111
0.05 Kg Paku Biasa 2" - 5" 1,250 M.111
A.4.5.2.39. P-298 1.00 m2 Pemasangan atap seng gelombang 67,710 0.2 .
0.12 OH Pekerja 10,200 L.1
0.06 OH Tukang Kayu 6,000 L.6
0.01 OH Kepala tukang 900 L.9
0.01 OH Mandor 1,110 L.10
0.70 Lbr Seng Gelombang 3" x 6" BJLS 28 49,000 M.61
0.02 Kg Paku Biasa 2" - 5" 500 M.111

Software RAB Exarch xPro 76/396


A.4.5.2.40. P-299 1.00 m1 Pemasangan nok atap seng 43,910 0.2 .
0.15 OH Pekerja 12,750 L.1
0.07 OH Tukang Kayu 7,000 L.6
0.01 OH Kepala tukang 1,050 L.9
0.01 OH Mandor 1,110 L.10
0.30 Lbr Seng Gelombang 3" x 6" BJLS 28 21,000 M.61
0.04 Kg Paku Biasa 2" - 5" 1,000 M.111
A.4.5.2.41. P-300 1.00 m2 Pemasangan atap alumunium 253,330 1.0 .
0.15 OH Pekerja 12,750 L.1
0.75 OH Tukang Kayu 75,000 L.6
0.08 OH Kepala tukang 12,000 L.9
0.01 OH Mandor 1,110 L.10
1.05 Lbr Alumunium gel tbl 0,55 152,250 M.1107
0.02 Kg Paku Hak Panjang 15cm 220 M.1134
A.4.5.2.42. P-301 1.00 m1 Pemasangan Nok alumunium 140,188 1.3 .
0.10 OH Pekerja 8,500 L.1
1.00 OH Tukang Kayu 100,000 L.6
0.10 OH Kepala tukang 15,000 L.9
0.05 OH Mandor 9,250 L.10
1.20 Bh Nok standar 40x18 6,998 M.1451
0.04 Kg Paku Hak Panjang 15cm 440 M.1134
A.4.5.2.43. P-302 1.00 m2 Pemasangan alumunium foil/sisalation 51,375 0.2 .
0.15 OH Pekerja 12,750 L.1
0.05 OH Tukang Kayu 5,000 L.6
0.01 OH Kepala tukang 750 L.9
0.01 OH Mandor 1,480 L.10
1.05 M2 Aluminium foil 31,395 M.1105
A.4.6.1.1. P-303 1.00 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendel 11,369,000 30.5 .
7.00 OH Pekerja 595,000 L.1
21.00 OH Tukang kayu 2,100,000 L.6
2.10 OH Kepala tukang 315,000 L.9
0.35 OH Mandor 64,750 L.10
1.10 m3 Balok kayu 8/15 Kelas I 8,250,000 M.1056
1.25 Kg Paku Biasa 2" - 5" 31,250 M.111
1.00 Kg Lem kayu 13,000 M.1493
A.4.6.1.2. P-304 1.00 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela 11,679,750 26.1 .
6.00 OH Pekerja 510,000 L.1
18.00 OH Tukang kayu 1,800,000 L.6
1.80 OH Kepala tukang 270,000 L.9
0.30 OH Mandor 55,500 L.10
1.20 m3 Balok kayu 8/15 Kelas I 9,000,000 M.1056
1.25 Kg Paku Biasa 2" - 5" 31,250 M.111
1.00 Kg Lem kayu 13,000 M.1493
A.4.6.1.3. P-305 1.00 m2 Pembuatan dan pemasangan pintu klamp standar, kayu k 295,080 1.5 .
0.35 OH Pekerja 29,750 L.1
1.05 OH Tukang kayu 105,000 L.6
0.11 OH Kepala tukang 15,750 L.9
0.02 OH Mandor 3,330 L.10
0.04 m3 Kayu Papan 3/20 140,000 M.1084
0.05 Kg Paku Biasa 2" - 5" 1,250 M.111
A.4.6.1.4. P-306 1.00 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu 295,080 1.5 .
0.35 OH Pekerja 29,750 L.1
1.05 OH Tukang kayu 105,000 L.6
0.11 OH Kepala tukang 15,750 L.9
0.02 OH Mandor 3,330 L.10
0.04 m3 Kayu Papan 3/20 140,000 M.1084
0.05 Kg Paku Biasa 2" - 5" 1,250 M.111
A.4.6.1.5. P-307 1.00 m2 Pembuatan dan pemasangan daun pintu panel, kayu kelas 585,750 4.4 .
1.00 OH Pekerja 85,000 L.1
3.00 OH Tukang kayu 300,000 L.6
0.30 OH Kepala tukang 45,000 L.9
0.05 OH Mandor 9,250 L.10

Software RAB Exarch xPro 77/396


0.04 m3 Kayu Papan 3/20 140,000 M.1084
0.50 Kg Lem kayu 6,500 M.1493
A.4.6.1.6. P-308 1.00 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu 439,300 3.5 .
0.80 OH Pekerja 68,000 L.1
2.40 OH Tukang kayu 240,000 L.6
0.24 OH Kepala tukang 36,000 L.9
0.04 OH Mandor 7,400 L.10
0.02 m3 Kayu Papan 3/20 84,000 M.1084
0.30 Kg Lem kayu 3,900 M.1493
A.4.6.1.7. P-309 1.00 m2 Pembuatan dan pemasangan pintu dan jendela jalusi kayu 669,750 4.4 .
1.00 OH Pekerja 85,000 L.1
3.00 OH Tukang kayu 300,000 L.6
0.30 OH Kepala tukang 45,000 L.9
0.05 OH Mandor 9,250 L.10
0.06 m3 Kayu Papan 3/20 224,000 M.1084
0.50 Kg Lem kayu 6,500 M.1493
A.4.6.1.8. P-310 1.00 m2 Pembuatan daun pintu plywood rangkap, rangka kayu ke 492,225 3.0 .
0.70 OH Pekerja 59,500 L.1
2.10 OH Tukang kayu 210,000 L.6
0.21 OH Kepala tukang 31,500 L.9
0.04 OH Mandor 6,475 L.10
0.03 m3 Kayu Papan 3/20 87,500 M.1084
0.03 kg Paku Biasa 2" - 5" 750 M.111
0.50 kg Lem kayu 6,500 M.1493
1.00 Lbr Plywood 120x240 tbl. 4 mm 90,000 M.58
A.4.6.1.9. P-311 1.00 m2 Pembuatan pintu plywood rangkap, rangka expose kayu k 538,250 3.5 .
0.80 OH Pekerja 68,000 L.1
2.40 OH Tukang kayu 240,000 L.6
0.24 OH Kepala tukang 36,000 L.9
0.04 OH Mandor 7,400 L.10
0.03 m3 Kayu Papan 3/20 89,600 M.1084
0.03 kg Paku Biasa 2" - 5" 750 M.111
0.50 kg Lem kayu 6,500 M.1493
1.00 Lbr Plywood 120x240 tbl. 4 mm 90,000 M.58
A.4.6.1.10. P-312 1.00 m2 Pemasangan jalusi kusen, kayu kelas I atau II 562,675 3.2 .
0.67 OH Pekerja 56,950 L.1
2.00 OH Tukang kayu 200,000 L.6
0.20 OH Kepala tukang 30,000 L.9
0.34 OH Mandor 61,975 L.10
0.06 m3 Kayu Papan 3/20 210,000 M.1084
0.15 kg Paku Biasa 2" - 5" 3,750 M.111
A.4.6.1.11. P-313 1.00 m2 Pemasangan teakwood rangkap, rangka expose kayu kela 501,550 3.5 .
0.80 OH Pekerja 68,000 L.1
2.40 OH Tukang kayu 240,000 L.6
0.24 OH Kepala tukang 36,000 L.9
0.04 OH Mandor 7,400 L.10
0.03 m3 Kayu Papan 3/20 87,500 M.1084
0.03 kg Paku Biasa 2" - 5" 750 M.111
0.30 kg Lem kayu 3,900 M.1493
1.00 Lbr Teakwood 4 mm 90 x 220 cm 58,000 M.1322
A.4.6.1.12. P-314 1.00 m2 Pemasangan teakwood rangkap lapis formika, rangka exp 575,105 3.7 .
0.85 OH Pekerja 72,250 L.1
2.55 OH Tukang kayu 255,000 L.6
0.26 OH Kepala tukang 38,250 L.9
0.04 OH Mandor 7,955 L.10
0.03 m3 Kayu Papan 3/20 87,500 M.1084
0.03 kg Paku Biasa 2" - 5" 750 M.111
0.80 kg Lem kayu 10,400 M.1493
1.00 Lbr Teakwood 4 mm 90 x 220 cm 58,000 M.1322
0.50 Lbr Formika 45,000 M.1309
A.4.6.1.13. P-315 1.00 m3 Pemasangan konstruksi kuda-kuda konvensional, kayu kel 10,334,500 17.4 .
4.00 OH Pekerja 340,000 L.1

Software RAB Exarch xPro 78/396


12.00 OH Tukang kayu 1,200,000 L.6
1.20 OH Kepala tukang 180,000 L.9
0.20 OH Mandor 37,000 L.10
1.10 m3 Balok kayu 8/15 Kelas I 8,250,000 M.1056
15.00 kg Baja strip (0,2 x 2) cm 187,500 M.15
5.60 kg Paku Biasa 2" - 5" 140,000 M.111
A.4.6.1.14. P-316 1.00 m3 Pemasangan konstruksi kuda-kuda expose, kayu kelas I 12,270,475 29.1 .
6.70 OH Pekerja 569,500 L.1
20.10 OH Tukang kayu 2,010,000 L.6
2.01 OH Kepala tukang 301,500 L.9
0.34 OH Mandor 61,975 L.10
1.20 m3 Balok kayu 8/15 Kelas I 9,000,000 M.1056
15.00 kg Baja strip (0,2 x 2) cm 187,500 M.15
5.60 kg Paku Biasa 2" - 5" 140,000 M.111
A.4.6.1.15. P-317 1.00 m3 Pemasangan konstruksi gordeng, kayu kelas II 11,455,475 29.1 .
6.70 OH Pekerja 569,500 L.1
20.10 OH Tukang kayu 2,010,000 L.6
2.01 OH Kepala tukang 301,500 L.9
0.34 OH Mandor 61,975 L.10
1.10 m3 Balok kayu 8/15 Kelas I 8,250,000 M.1056
15.00 kg Baja strip (0,2 x 2) cm 187,500 M.15
3.00 kg Paku Biasa 2" - 5" 75,000 M.111
A.4.6.1.16. P-318 1.00 m2 Pemasangan rangka atap genteng keramik, kayu kelas II 174,575 0.2 .
0.10 OH Pekerja 8,500 L.1
0.10 OH Tukang kayu 10,000 L.6
0.01 OH Kepala tukang 1,500 L.9
0.01 OH Mandor 925 L.10
0.01 m3 Kayu balok 5/7 Kelas II 32,200 M.1066
0.04 m3 Reng 2 x 3 cm Kayu Kelas II 115,200 M.1031
0.25 kg Paku Biasa 2" - 5" 6,250 M.111
A.4.6.1.17. P-319 1.00 m2 Pemasangan rangka atap genteng beton, kayu kelas II 241,775 0.2 .
0.10 OH Pekerja 8,500 L.1
0.10 OH Tukang kayu 10,000 L.6
0.01 OH Kepala tukang 1,500 L.9
0.01 OH Mandor 925 L.10
0.01 m3 Kayu balok 5/7 Kelas II 32,200 M.1066
0.06 m3 Reng 2 x 3 cm Kayu Kelas II 182,400 M.1031
0.25 kg Paku Biasa 2" - 5" 6,250 M.111
A.4.6.1.18. P-320 1.00 m2 Pemasangan rangka atap sirap, kayu kelas II 58,735 0.3 .
0.12 OH Pekerja 10,200 L.1
0.12 OH Tukang kayu 12,000 L.6
0.01 OH Kepala tukang 1,800 L.9
0.01 OH Mandor 1,110 L.10
0.01 m3 Kayu balok 5/7 Kelas II 32,200 M.1066
0.06 m3 Paku Biasa 2" - 5" 1,425 M.111
A.4.6.1.19. P-321 1.00 m2 Pemasangan rangka langit-langit (50 x 100) cm, kayu kel 101,545 0.6 .
0.15 OH Pekerja 12,750 L.1
0.30 OH Tukang kayu 30,000 L.6
0.03 OH Kepala tukang 4,500 L.9
0.08 OH Mandor 13,875 L.10
0.02 m3 Kayu balok 5/7 Kelas II 35,420 M.1066
0.20 kg Paku Biasa 2" - 5" 5,000 M.111
A.4.6.1.20. P-322 1.00 m2 Pemasangan rangka langit-langit (60 x 60) cm, kayu kelas 97,090 0.5 .
0.20 OH Pekerja 17,000 L.1
0.30 OH Tukang kayu 30,000 L.6
0.03 OH Kepala tukang 4,500 L.9
0.01 OH Mandor 1,850 L.10
0.02 m3 Kayu balok 5/7 Kelas II 37,490 M.1066
0.25 kg Paku Biasa 2" - 5" 6,250 M.111
A.4.6.1.21. P-323 1.00 m1 Pemasangan lisplank ukuran (3 x 20) cm, kayu kelas I ata 72,725 0.3 .
0.10 OH Pekerja 8,500 L.1
0.20 OH Tukang kayu 20,000 L.6

Software RAB Exarch xPro 79/396


0.02 OH Kepala tukang 3,000 L.9
0.01 OH Mandor 925 L.10
0.01 m3 Kayu Papan 3/20 37,800 M.1084
0.10 kg Paku Biasa 2" - 5" 2,500 M.111
A.4.6.1.22. P-324 1.00 m1 Pemasangan lisplank ukuran (3 x 30) cm, kayu kelas I atau 72,175 0.3 .
0.10 OH Pekerja 8,500 L.1
0.20 OH Tukang kayu 20,000 L.6
0.02 OH Kepala tukang 3,000 L.9
0.01 OH Mandor 925 L.10
0.01 m3 Kayu Papan 3/20 38,500 M.1084
0.05 kg Paku Biasa 2" - 5" 1,250 M.111
A.4.6.1.23. P-325 1.00 m2 Pemasangan rangka dinding pemisah (60 x 120) cm kayu k 279,730 0.7 .
0.15 OH Pekerja 12,750 L.1
0.45 OH Tukang kayu 45,000 L.6
0.05 OH Kepala tukang 6,750 L.9
0.01 OH Mandor 1,480 L.10
0.03 m3 Balok kayu 8/15 Kelas I 210,000 M.1056
0.15 kg Paku Biasa 2" - 5" 3,750 M.111
A.4.6.1.24. P-326 1.00 m2 Pemasangan dinding pemisah teakwood rangkap, rangka 263,210 0.7 .
0.15 OH Pekerja 12,750 L.1
0.45 OH Tukang kayu 45,000 L.6
0.05 OH Kepala tukang 6,750 L.9
0.01 OH Mandor 1,480 L.10
0.03 m3 Balok kayu, 6 x 12 126,000 M.1065
0.15 kg Paku Biasa 2" - 5" 3,750 M.111
0.86 Lbr Teakwood 4 mm, 120 x 240 60,200 M.1323
0.56 kg Lem kayu 7,280 M.1493
A.4.6.1.25. P-327 1.00 m2 Pemasangan dinding pemisah plywood rangkap, rangka k 302,280 0.9 .
0.20 OH Pekerja 17,000 L.1
0.60 OH Tukang kayu 60,000 L.6
0.06 OH Kepala tukang 9,000 L.9
0.01 OH Mandor 1,850 L.10
0.03 m3 Balok kayu, 6 x 12 126,000 M.1065
0.15 kg Paku Biasa 2" - 5" 3,750 M.111
0.86 Lbr Plywood 120x240 tbl. 4 mm 77,400 M.58
0.56 kg Lem kayu 7,280 M.1493
A.4.6.1.26. P-328 1.00 m2 Pemasangan dinding lambrisering dari Kayu Papan kelas 290,663 2.6 .
0.60 OH Pekerja 51,000 L.1
1.80 OH Tukang kayu 180,000 L.6
0.18 OH Kepala tukang 27,000 L.9
0.03 OH Mandor 5,550 L.10
0.01 m3 Kayu Papan 3/20 24,500 M.1084
0.10 kg Paku Biasa 2" - 5" 2,500 M.111
0.15 kg Paku sekrup 113 M.112
A.4.6.1.27. P-329 1.00 m2 Pemasangan dinding lambrisering dari plywood ukuran ( 48,260 0.1 .
0.03 OH Pekerja 2,125 L.1
0.08 OH Tukang kayu 7,500 L.6
0.01 OH Kepala tukang 1,200 L.9
0.00 OH Mandor 185 L.10
0.40 m3 Plywood 120x240 tbl. 4 mm 36,000 M.58
0.05 kg Paku Biasa 2" - 5" 1,250 M.111
A.4.6.1.28. P-330 1.00 m2 Pemasangan dinding bilik, rangka kayu kelas III atau IV 176,675 0.2 .
0.10 OH Pekerja 8,500 L.1
0.05 OH Tukang kayu 5,000 L.6
0.01 OH Kepala tukang 750 L.9
0.01 OH Mandor 925 L.10
1.50 m2 Bilik bambu 112,500 M.1308
0.01 m3 Kayu balok 5/7 Kelas II 32,200 M.1066
0.01 kg Paku Biasa 2" - 5" 300 M.111
0.00 m3 List kayu 2/4 16,500 M.1027
A.4.6.2.1. P-331 1.00 bh Pemasangan kunci tanam antik 324,655 0.7 .
0.06 OH Pekerja 5,100 L.1

Software RAB Exarch xPro 80/396


0.60 OH Tukang kayu 60,000 L.6
0.06 OH Kepala tukang 9,000 L.9
0.00 OH Mandor 555 L.10
1.00 Bh Kunci tanam antik 250,000 M.1519
A.4.6.2.2. P-332 1.00 bh Pemasangan kunci tanam biasa 189,275 0.6 .
0.01 OH Pekerja 850 L.1
0.50 OH Tukang kayu 50,000 L.6
0.05 OH Kepala tukang 7,500 L.9
0.01 OH Mandor 925 L.10
1.00 Bh Kunci tanam biasa 130,000 M.1520
A.4.6.2.3. P-333 1.00 bh Pemasangan kunci kamar mandi 108,480 0.6 .
0.01 OH Pekerja 425 L.1
0.50 OH Tukang kayu 50,000 L.6
0.05 OH Kepala tukang 7,500 L.9
0.00 OH Mandor 555 L.10
1.00 Bh Kunci tanam KM 50,000 M.1521
A.4.6.2.4. P-334 1.00 bh Pemasangan kunci silinder 133,480 0.6 .
0.01 OH Pekerja 425 L.1
0.50 OH Tukang kayu 50,000 L.6
0.05 OH Kepala tukang 7,500 L.9
0.00 OH Mandor 555 L.10
1.00 Bh Kunci silinder 75,000 M.1517
A.4.6.2.5. P-335 1.00 bh Pemasangan engsel pintu 35,673 0.2 .
0.02 OH Pekerja 1,275 L.1
0.15 OH Tukang kayu 15,000 L.6
0.02 OH Kepala tukang 2,250 L.9
0.00 OH Mandor 148 L.10
1.00 Bh Engsel pintu 17,000 M.125
A.4.6.2.6. P-336 1.00 bh Pemasangan engsel jendela kupu-kupu 32,443 0.1 .
0.01 OH Pekerja 850 L.1
0.10 OH Tukang kayu 10,000 L.6
0.01 OH Kepala tukang 1,500 L.9
0.00 OH Mandor 93 L.10
1.00 Bh Engsel kupu-kupu 20,000 M.1512
A.4.6.2.7. P-337 1.00 bh Pemasangan engsel angin 39,593 0.3 .
0.10 OH Pekerja 8,500 L.1
0.20 OH Tukang kayu 20,000 L.6
0.02 OH Kepala tukang 3,000 L.9
0.00 OH Mandor 93 L.10
1.00 Bh Engsel angin 8,000 M.1510
A.4.6.2.8. P-338 1.00 bh Pemasangan spring knip 27,505 0.2 .
0.02 OH Pekerja 1,275 L.1
0.15 OH Tukang kayu 15,000 L.6
0.02 OH Kepala tukang 2,250 L.9
0.01 OH Mandor 1,480 L.10
1.00 Bh Spring knip 7,500 M.1536
A.4.6.2.9. P-339 1.00 bh Pemasangan kait angin 25,505 0.2 .
0.02 OH Pekerja 1,275 L.1
0.15 OH Tukang kayu 15,000 L.6
0.02 OH Kepala tukang 2,250 L.9
0.01 OH Mandor 1,480 L.10
1.00 Bh Kait angin 5,500 M.1119
A.4.6.2.10. P-340 1.00 bh Pemasangan door closer 312,305 0.6 .
0.05 OH Pekerja 4,250 L.1
0.50 OH Tukang kayu 50,000 L.6
0.05 OH Kepala tukang 7,500 L.9
0.00 OH Mandor 555 L.10
1.00 set Door closer 250,000 M.1507
A.4.6.2.11. P-341 1.00 bh Pemasangan kunci slot 74,885 0.2 .
0.02 OH Pekerja 1,700 L.1
0.20 OH Tukang kayu 20,000 L.6
0.02 OH Kepala tukang 3,000 L.9

Software RAB Exarch xPro 81/396


0.00 OH Mandor 185 L.10
1.00 Bh Kunci slot 50,000 M.1518
A.4.6.2.12. P-342 1.00 bh Pemasangan Door holder 159,305 0.6 .
0.05 OH Pekerja 4,250 L.1
0.50 OH Tukang kayu 50,000 L.6
0.05 OH Kepala tukang 7,500 L.9
0.00 OH Mandor 555 L.10
1.00 Bh Door holder 97,000 M.1508
A.4.6.2.13. P-343 1.00 bh Pemasangan door stop 111,275 0.1 .
0.01 OH Pekerja 850 L.1
0.10 OH Tukang kayu 10,000 L.6
0.01 OH Kepala tukang 1,500 L.9
0.01 OH Mandor 925 L.10
1.00 Bh Door stop 98,000 M.1509
A.4.6.2.14. P-344 1.00 bh Pemasangan Rrel pintu sorong 274,655 0.7 .
0.06 OH Pekerja 5,100 L.1
0.60 OH Tukang kayu 60,000 L.6
0.06 OH Kepala tukang 9,000 L.9
0.00 OH Mandor 555 L.10
1.00 Set Rel pintu dorong 200,000 M.1151
A.4.6.2.15. P-345 1.00 bh Pemasangan kunci lemari 43,116 0.3 .
0.03 OH Pekerja 2,125 L.1
0.25 OH Tukang kayu 25,000 L.6
0.03 OH Kepala tukang 3,750 L.9
0.00 OH Mandor 241 L.10
1.00 Set Kunci lemari 12,000 M.1516
A.4.6.2.16. P-346 1.00 m2 Pemasangan kaca tebal 3 mm 128,573 0.2 .
0.02 OH Pekerja 1,275 L.1
0.15 OH Tukang kayu 15,000 L.6
0.02 OH Kepala tukang 2,250 L.9
0.00 OH Mandor 148 L.10
1.10 m2 Kaca tebal 3mm 99,000 M.1468
0.05 Kg SEalant 10,900 M.1535
A.4.6.2.17. P-347 1.00 m2 Pemasangan kaca tebal 5 mm 161,573 0.2 .
0.02 OH Pekerja 1,275 L.1
0.15 OH Tukang kayu 15,000 L.6
0.02 OH Kepala tukang 2,250 L.9
0.00 OH Mandor 148 L.10
1.10 m2 Kaca tebal 5 mm 132,000 M.1469
0.05 Kg SEalant 10,900 M.1535
A.4.6.2.18. P-348 1.00 m2 Pemasangan kaca tebal 8 mm 238,272 0.2 .
0.02 OH Pekerja 1,445 L.1
0.17 OH Tukang kayu 17,000 L.6
0.02 OH Kepala tukang 2,550 L.9
0.00 OH Mandor 167 L.10
1.10 m2 Kaca tebal 8 mm 201,850 M.1470
0.07 Kg SEalant 15,260 M.1535
A.4.6.2.19. P-349 1.00 m2 Pemasangan kaca buram tebal 12 mm 211,376 0.3 .
0.03 OH Pekerja 2,125 L.1
0.25 OH Tukang kayu 25,000 L.6
0.03 OH Kepala tukang 3,750 L.9
0.00 OH Mandor 241 L.10
1.10 m2 Kaca buram 12 mm 165,000 M.1463
0.07 Kg SEalant 15,260 M.1535
A.4.6.2.20. P-350 1.00 m2 Pemasangan kaca cermin tebal 5 mm 185,555 0.2 .
0.02 OH Pekerja 1,275 L.1
0.15 OH Tukang kayu 15,000 L.6
0.02 OH Kepala tukang 2,250 L.9
0.01 OH Mandor 1,480 L.10
1.10 m2 Kaca cermin 5 mm 165,550 M.1464
A.4.6.2.21. P-351 1.00 m2 Pemasangan kaca cermin tebal 8 mm 281,160 0.2 .
0.02 OH Pekerja 1,445 L.1

Software RAB Exarch xPro 82/396


0.17 OH Tukang kayu 17,000 L.6
0.02 OH Kepala tukang 2,550 L.9
0.01 OH Mandor 1,665 L.10
1.10 m2 Kaca cermin 8 mm 258,500 M.1465
A.4.6.2.22. P-352 1.00 m2 Pemasangan kaca wireglassed tebal 5 mm 278,505 0.2 .
0.02 OH Pekerja 1,275 L.1
0.15 OH Tukang kayu 15,000 L.6
0.02 OH Kepala tukang 2,250 L.9
0.01 OH Mandor 1,480 L.10
1.10 m2 Kaca wire glass 258,500 M.1471
A.4.6.2.23. P-353 1.00 m2 Pemasangan kaca patri tebal 5 mm 128,765 0.2 .
0.08 OH Pekerja 6,375 L.1
0.15 OH Tukang kayu 15,000 L.6
0.02 OH Kepala tukang 2,250 L.9
0.00 OH Mandor 740 L.10
1.10 m2 Kaca patri 5mm 93,500 M.1466
0.05 Kg Sealant 10,900 M.1535
A.4.7.1.1. P-354 1.00 m2 Pengikisan/pengerokan permukaan cat lama 15,555 0.2 .
0.15 OH Pekerja 12,750 L.1
0.00 OH Mandor 555 L.10
0.05 Kg Soda api 2,250 M.1501
A.4.7.1.2. P-355 1.00 m2 Pencucian bidang permukaan tembok yang pernah dicat 13,865 0.2 .
0.15 OH Pekerja 12,750 L.1
0.00 OH Mandor 555 L.10
0.05 Kg Sabun 560 M.1500
A.4.7.1.3. P-356 1.00 m2 Pengerokan karat pada permukaan baja cara manual 14,790 0.2 .
0.15 OH Pekerja 12,750 L.1
0.01 OH Mandor 1,480 L.10
0.05 Kg Sabun 560 M.1500
A.4.7.1.4. P-357 1.00 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat 41,935 0.1 .
0.07 OH Pekerja 5,950 L.1
0.01 OH Tukang cat 900 L.5
0.01 OH Kepala tukang 900 L.9
0.00 OH Mandor 555 L.10
0.20 Kg Cat meni 3,260 M.69
0.15 Kg Plamir 1,800 M.11
0.17 Kg Cat Dasar Kayu/Besi 11,050 M.71
0.26 Kg Cat kayu 15,600 M.72
0.01 Bh Kuas 170 M.138
0.03 Kg Pengencer 1,050 M.1347
0.20 Lbr Amplas 700 M.134
A.4.7.1.5. P-358 1.00 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis ca 56,635 0.2 .
0.07 OH Pekerja 5,950 L.1
0.11 OH Tukang cat 10,500 L.5
0.00 OH Kepala tukang 600 L.9
0.00 OH Mandor 555 L.10
0.20 Kg Cat meni 3,260 M.69
0.15 Kg Plamir 1,800 M.11
0.17 Kg Cat Dasar Kayu/Besi 11,050 M.71
0.35 Kg Cat kayu 21,000 M.72
0.01 Bh Kuas 170 M.138
0.03 Kg Pengencer 1,050 M.1347
0.20 Lbr Amplas 700 M.134
A.4.7.1.6. P-359 1.00 m2 Pelaburan bidang kayu dengan teak oil 25,645 0.2 .
0.04 OH Pekerja 3,400 L.1
0.06 OH Tukang cat 6,300 L.5
0.06 OH Kepala tukang 9,450 L.9
0.00 OH Mandor 555 L.10
0.36 L Teak oil 5,940 M.1349
A.4.7.1.7. P-360 1.00 m2 Pelaburan bidang kayu dengan politur 37,625 0.1 .
0.04 OH Pekerja 3,400 L.1
0.06 OH Tukang cat 6,000 L.5

Software RAB Exarch xPro 83/396


0.02 OH Kepala tukang 2,400 L.9
0.00 OH Mandor 555 L.10
0.15 L Politur 5,250 M.1348
0.37 L Politur 13,020 M.1348
2.00 Lbr Amplas 7,000 M.134
A.4.7.1.8. P-361 1.00 m2 Pelaburan bidang kayu dengan cat residu dan ter 12,585 0.1 .
0.10 OH Pekerja 8,500 L.1
0.01 OH Mandor 1,110 L.10
0.35 L Residu 2,975 M.1499
A.4.7.1.9. P-362 1.00 m2 Pelaburan bidang kayu dengan vernis 52,095 0.3 .
0.16 OH Pekerja 13,600 L.1
0.16 OH Tukang cat 16,000 L.5
0.02 OH Kepala tukang 2,400 L.9
0.00 OH Mandor 555 L.10
0.15 L Vernis 17,250 M.1350
0.05 Kg Dempul 1,940 M.1337
0.10 Lbr Amplas 350 M.134
A.4.7.1.10. P-363 1.00 m2 Pengecatan tembok baru ( 1lapis plamuur, 1 lapis cat das 26,300 0.1 .
0.02 OH Pekerja 1,700 L.1
0.06 OH Tukang cat 6,300 L.5
0.01 OH Kepala tukang 945 L.9
0.00 OH Mandor 555 L.10
0.10 Kg Plamir 1,200 M.11
0.10 Kg Cat Tembok Dasar 6,500 M.1331
0.26 Kg Cat Penutup Tembok 9,100 M.1336
A.4.7.1.11. P-364 1.00 m2 Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat p 21,865 0.1 .
0.03 OH Pekerja 2,380 L.1
0.04 OH Tukang cat 4,200 L.5
0.00 OH Kepala tukang 630 L.9
0.00 OH Mandor 555 L.10
0.12 Kg Cat Tembok Dasar 7,800 M.1331
0.18 Kg Cat Penutup Tembok 6,300 M.1336
A.4.7.1.12. P-365 1.00 m2 Pelaburan tembok dengan kalkarium 8,290 0.1 .
0.03 OH Pekerja 2,380 L.1
0.04 OH Tukang cat 4,200 L.5
0.00 OH Kepala tukang 630 L.9
0.00 OH Mandor 555 L.10
0.10 Kg Kalkarium 525 M.1529
A.4.7.1.13. P-366 1.00 m2 Pelaburan tembok dengan kapur sirih 15,795 0.2 .
0.15 OH Pekerja 12,750 L.1
0.00 OH Tukang cat 100 L.5
0.00 OH Kepala tukang 15 L.9
0.00 OH Mandor 463 L.10
0.15 Kg Kapur sirih 1,980 M.1016
0.10 Lbr Amplas 350 M.134
0.25 Ikat Alang-alang 138 M.1001
A.4.7.1.14. P-367 1.00 m2 Pelaburan tembok lama dengan kapur sirih (pemeliharaa 9,235 0.0 .
0.04 OH Pekerja 3,400 L.1
0.01 OH Tukang cat 500 L.5
0.00 OH Kepala tukang 75 L.9
0.00 OH Mandor 463 L.10
0.30 Kg Kapur sirih 3,960 M.1016
0.20 Lbr Amplas 700 M.134
0.25 Ikat Alang-alang 138 M.1001
A.4.7.1.15. P-368 1.00 m2 Pemasangan wallpaper 69,763 0.2 .
0.02 OH Pekerja 1,700 L.1
0.20 OH Tukang cat 20,000 L.5
0.02 OH Kepala tukang 3,000 L.9
0.00 OH Mandor 463 L.10
1.20 m2 Wallpaper 42,000 M.1325
0.20 Kg Lem kayu 2,600 M.1493
A.4.7.1.16. P-369 1.00 m2 Pengecatan permukaan baja dengan menie besi 28,033 0.2 .

Software RAB Exarch xPro 84/396


0.02 OH Pekerja 1,700 L.1
0.20 OH Tukang cat 20,000 L.5
0.02 OH Kepala tukang 3,000 L.9
0.00 OH Mandor 463 L.10
0.10 Kg Menie besi 2,700 M.1345
0.01 Bh Kuas 170 M.138
A.4.7.1.17. P-370 1.00 m2 Pengecatan permukaan baja dengan menie besi dengan 54,433 0.5 .
0.25 OH Pekerja 21,250 L.1
0.23 OH Tukang cat 22,500 L.5
0.02 OH Kepala tukang 3,375 L.9
0.01 OH Mandor 1,388 L.10
0.10 Kg Menie besi 2,700 M.1345
0.01 L Pengencer 350 M.1347
0.01 Bh Kuas 170 M.138
0.00 m3 Perancah kayu 2,700 A.13
A.4.7.1.18. P-371 1.00 m2 Pengecatan permukaan baja galvanis secara manual 4 lap 61,601 0.5 .
0.25 OH Pekerja 21,250 L.1
0.25 OH Tukang cat 25,000 L.5
0.03 OH Kepala tukang 3,750 L.9
0.00 OH Mandor 241 L.10
0.10 Kg Menie A 3,400 M.1343
0.10 Kg Menie B 3,600 M.1344
0.08 Kg Cat Besi 3,840 M.70
0.01 Bh Kuas 170 M.138
0.01 L Pengencer 350 M.1347
A.4.7.1.19. P-372 1.00 m2 Pengecatan permukaan baja galvanis secara manual sist 28,375 0.1 .
0.06 OH Pekerja 5,100 L.1
0.06 OH Tukang cat 6,000 L.5
0.01 OH Kepala tukang 1,800 L.9
0.00 OH Mandor 555 L.10
0.30 Kg Cat Besi 14,400 M.70
0.01 Bh Kuas 170 M.138
0.01 L Pengencer 350 M.1347
A.4.7.1.20. P-373 1.00 m2 Pengecatan permukaan baja galvanis secara manual siste 145,120 1.3 .
0.40 OH Pekerja 34,000 L.1
0.80 OH Tukang cat 80,000 L.5
0.08 OH Kepala tukang 12,000 L.9
0.02 OH Mandor 3,700 L.10
0.11 Kg Cat dasar Besi 3,410 M.1329
0.17 Kg Cat antara 7,650 M.1327
0.08 Kg Cat Besi 3,840 M.70
0.01 Bh Kuas 170 M.138
0.01 L Pengencer 350 M.1347
A.4.7.1.21. P-374 1.00 m2 Pengecatan permukaan baja galvanis secara semprot sist 132,950 1.2 .
0.40 OH Pekerja 34,000 L.1
0.70 OH Tukang cat 70,000 L.5
0.07 OH Kepala tukang 10,500 L.9
0.02 OH Mandor 3,700 L.10
0.30 Kg Cat Besi 14,400 M.70
0.01 L Pengencer 350 M.1347
A.4.7.1.22. P-375 1.00 m2 Plituran dengan plitur melamic 13,805 0.1 .
0.04 OH Pekerja 3,400 L.1
0.07 OH Tukang cat 7,000 L.5
0.01 OH Kepala tukang 1,050 L.9
0.00 OH Mandor 370 L.10
0.03 Kg Cat Dasar Kayu/Besi 1,950 M.71
0.00 L Pengencer 35 M.1347
A.5.1.1.1. P-376 1.00 bh (K3) Pemasangan closet duduk/moblock 2,936,600 4.6 .
3.30 OH Pekerja 280,500 L.1
1.10 OH Tukang batu 110,000 L.3
0.01 OH Kepala tukang 1,500 L.9
0.16 OH Mandor 29,600 L.10

Software RAB Exarch xPro 85/396


1.00 Unit Kloset Duduk 2,500,000 M.43
0.06 Ls Perlengkapan Umum 15,000 A.4
A.5.1.1 2. P-377 1.00 bh Pemasangan closet jongkok porslen 547,450 2.8 .
1.00 OH Pekerja 85,000 L.1
1.50 OH Tukang batu 150,000 L.3
0.15 OH Kepala tukang 22,500 L.9
0.16 OH Mandor 29,600 L.10
1.00 Unit Kloset Jongkok 250,000 M.44
6.00 Kg Semen 7,800 M.12
0.01 M3 Pasir pasang 2,550 M.9
A.5.1.1 3. P-378 1.00 bh Pemasangan closet jongkok teraso 531,650 2.7 .
1.00 OH Pekerja 85,000 L.1
1.50 OH Tukang batu 150,000 L.3
0.15 OH Kepala tukang 22,500 L.9
0.05 OH Mandor 9,250 L.10
1.00 Unit Kloset Jongkok 250,000 M.44
6.00 Kg Semen 7,800 M.12
0.01 M3 Pasir pasang 2,550 M.9
7.00 Bh Bata merah 4,550 M.2
A.5.1.1 4. P-379 1.00 bh (K3) Pemasangan uriir 1,694,600 2.2 .
1.00 OH Pekerja 85,000 L.1
1.00 OH Tukang batu 100,000 L.3
0.10 OH Kepala tukang 15,000 L.9
0.05 OH Mandor 9,250 L.10
1.00 Unit Urinoir 1,400,000 M.1166
6.00 Kg Semen 7,800 M.12
0.01 M3 Pasir pasang 2,550 M.9
0.30 Ls Perlengkapan Umum 75,000 A.4
A.5.1.1 5. P-380 1.00 bh (K3) Pemasangan wastafel 1,580,950 2.9 .
1.20 OH Pekerja 102,000 L.1
1.45 OH Tukang batu 145,000 L.3
0.15 OH Kepala tukang 22,500 L.9
0.06 OH Mandor 11,100 L.10
1.20 Unit Wastafel 1,260,000 M.55
6.00 Kg Semen 7,800 M.12
0.01 M3 Pasir pasang 2,550 M.9
0.12 Ls Perlengkapan Umum 30,000 A.4
A.5.1.1 6. P-381 1.00 bh (K3) Pemasangan bathcuip porselen 2,893,180 0.9 .
0.08 OH Pekerja 6,375 L.1
0.75 OH Tukang batu 75,000 L.3
0.08 OH Kepala tukang 11,250 L.9
0.00 OH Mandor 555 L.10
1.00 Unit Bathcuip 2,750,000 M.1159
0.20 Ls Perlengkapan Umum 50,000 A.4
A.5.1.1 7. P-382 1.00 bh (K3) Pemasangan bak fibreglass vol 1 m3 1,229,000 8.5 .
3.00 OH Pekerja 255,000 L.1
4.50 OH Tukang batu 450,000 L.3
0.05 OH Kepala tukang 7,500 L.9
0.90 OH Mandor 166,500 L.10
1.00 Unit Bak fiberglass 320,000 M.1157
0.12 Ls Perlengkapan Umum 30,000 A.4
A.5.1.1 8. P-383 1.00 bh (K3) Pemasangan bak mandi batu bata vol 0,30 m3 3,620,550 9.3 .
6.00 OH Pekerja 510,000 L.1
3.00 OH Tukang batu 300,000 L.3
0.30 OH Kepala tukang 45,000 L.9
0.03 OH Mandor 5,550 L.10
150.00 M3 Bata merah 97,500 M.2
120.00 Kg Semen 156,000 M.12
0.30 M3 Pasir pasang 76,500 M.9
360.00 bh Porselen (11 x 11) cm 2,340,000 M.1396
6.00 Kg Semen warna 90,000 M.13
A.5.1.1 9. P-384 1.00 bh Pemasangan bak mandi teraso vol 0,30 m3 1,229,000 8.5 .

Software RAB Exarch xPro 86/396


3.00 OH Pekerja 255,000 L.1
4.50 OH Tukang batu 450,000 L.3
0.05 OH Kepala tukang 7,500 L.9
0.90 OH Mandor 166,500 L.10
1.00 Unit Bak fiberglass 320,000 M.1157
0.12 Ls Perlengkapan Umum 30,000 A.4
A.5.1.1 10. P-385 1.00 bh Pemasangan bak air fibreglass vol 1 m3 430,025 0.8 .
0.30 OH Pekerja 25,500 L.1
0.45 OH Tukang batu 45,000 L.3
0.05 OH Kepala tukang 6,750 L.9
0.02 OH Mandor 2,775 L.10
1.00 Unit Bak fiberglass 320,000 M.1157
0.12 Ls Perlengkapan Umum 30,000 A.4
A.5.1.1 11. P-386 1.00 bh Pemasangan bak beton volume 1 m3 8,113,330 8.1 .
3.50 OH Pekerja 297,500 L.1
4.50 OH Tukang batu 450,000 L.3
0.05 OH Kepala tukang 7,500 L.9
0.02 OH Mandor 3,330 L.10
0.90 M3 Beton 1:2:3 1,080,000 M.1474
180.00 Kg Besi beton 1,800,000 M.16
8.00 M2 Kayu cetakan 1,200,000 M.1030
500.00 Bh Ubin porselen 3,250,000 M.1410
0.10 Ls Perlengkapan Umum 25,000 A.4
A.5.1.1 12. P-387 1.00 bh Pemasangan bak cuci piring stainlessteel 545,825 0.4 .
0.03 OH Pekerja 2,550 L.1
0.30 OH Tukang batu 30,000 L.3
0.03 OH Kepala tukang 4,500 L.9
0.02 OH Mandor 2,775 L.10
1.00 Unit Bak cuci piring 430,000 M.1156
1.00 Bh Waterdrain 76,000 M.1167
A.5.1.1 13. P-388 1.00 bh Pemasangan bak cuci piring teraso 611,125 0.6 .
0.05 OH Pekerja 4,250 L.1
0.50 OH Tukang batu 50,000 L.3
0.05 OH Kepala tukang 7,500 L.9
0.03 OH Mandor 4,625 L.10
1.00 Unit Bak cuci piring 430,000 M.1156
1.00 Bh Waterdrain 76,000 M.1167
20.00 Kg Semen 26,000 M.12
0.05 M3 Pasir pasang 12,750 M.9
A.5.1.1 14. P-389 1.00 bh Pemasangan floor drain 73,275 0.1 .
0.01 OH Pekerja 850 L.1
0.10 OH Tukang batu 10,000 L.3
0.01 OH Kepala tukang 1,500 L.9
0.01 OH Mandor 925 L.10
1.00 Unit Floor drain 60,000 M.41
A.5.1.1 15. P-390 1.00 bh Pemasangan bak kontrol pasangan bata 30x30 tinggi 35 415,885 3.0 .
2.16 OH Pekerja 183,600 L.1
0.72 OH Tukang batu 72,000 L.3
0.07 OH Kepala tukang 10,800 L.9
0.01 OH Mandor 2,035 L.10
40.00 bh Bata merah 26,000 M.2
44.00 Kg Semen 57,200 M.12
0.07 M3 Pasir pasang 17,850 M.9
0.06 M3 Pasir beton 15,000 M.8
0.07 M3 Kerikil 15,400 M.7
1.60 Kg Besi beton 16,000 M.16
A.5.1.1 16. P-391 1.00 bh Pemasangan bak kontrol pasangan bata 45cm x45cm ting 623,260 4.4 .
3.20 OH Pekerja 272,000 L.1
1.15 OH Tukang batu 115,000 L.3
0.01 OH Kepala tukang 1,650 L.9
0.02 OH Mandor 2,960 L.10
70.00 bh Bata merah 45,500 M.2

Software RAB Exarch xPro 87/396


77.00 Kg Semen 100,100 M.12
0.13 M3 Pasir pasang 33,150 M.9
0.09 M3 Pasir beton 22,500 M.8
0.02 M3 Kerikil 4,400 M.7
2.60 Kg Besi beton 26,000 M.16
A.5.1.1 17. P-392 1.00 bh Pemasangan bak kontrol pasangan bata 60cm x60cm ting 752,440 4.4 .
3.20 OH Pekerja 272,000 L.1
1.15 OH Tukang batu 115,000 L.3
0.01 OH Kepala tukang 1,650 L.9
0.02 OH Mandor 2,960 L.10
123.00 bh Bata merah 79,950 M.2
114.00 Kg Semen 148,200 M.12
0.18 M3 Pasir pasang 46,920 M.9
0.12 M3 Pasir beton 30,000 M.8
0.03 M3 Kerikil 7,260 M.7
4.85 Kg Besi beton 48,500 M.16
A.5.1.1 18. P-393 1.00 m1 Pemasangan pipa galvanis diameter ½” 52,135 0.2 .
0.05 OH Pekerja 4,590 L.1
0.09 OH Tukang batu 9,000 L.3
0.01 OH Kepala tukang 1,350 L.9
0.03 OH Mandor 4,995 L.10
1.20 M Pipa galvanis ½” 25,200 M.1170
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
A.5.1.1 19. P-394 1.00 bh Pemasangan kran diameter ½” atau 3/4” 72,888 0.5 .
0.01 OH Pekerja 850 L.1
0.40 OH Tukang batu 40,000 L.3
0.04 OH Kepala tukang 6,000 L.9
0.01 OH Mandor 925 L.10
1.00 M Kran air 25,000 M.45
0.03 bh Sealtape 113 M.144
A.5.1.1 20. P-395 1.00 m1 Pemasangan pipa galvanis diameter 3/4” 58,135 0.2 .
0.05 OH Pekerja 4,590 L.1
0.09 OH Tukang batu 9,000 L.3
0.01 OH Kepala tukang 1,350 L.9
0.03 OH Mandor 4,995 L.10
1.20 M Pipa galvanis 3/4” 31,200 M.1171
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
A.5.1.1 21. P-396 1.00 m1 Pemasangan pipa galvanis diameter 1” 74,935 0.2 .
0.05 OH Pekerja 4,590 L.1
0.09 OH Tukang batu 9,000 L.3
0.01 OH Kepala tukang 1,350 L.9
0.03 OH Mandor 4,995 L.10
1.20 M Pipa galvanis 1” 48,000 M.1172
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
A.5.1.1 22. P-397 1.00 m1 Pemasangan pipa galvanis diameter 1 ½” 129,005 0.3 .
0.11 OH Pekerja 9,180 L.1
0.18 OH Tukang batu 18,000 L.3
0.02 OH Kepala tukang 2,700 L.9
0.01 OH Mandor 925 L.10
1.20 M Pipa galvanis 11/2” 91,200 M.1173
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
A.5.1.1 23. P-398 1.00 m1 Pemasangan pipa galvanis diameter 3” 165,720 0.4 .
0.14 OH Pekerja 11,475 L.1
0.23 OH Tukang batu 22,500 L.3
0.02 OH Kepala tukang 3,450 L.9
0.01 OH Mandor 1,295 L.10
1.20 M Pipa galvanis 3” 120,000 M.1174
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
A.5.1.1 24. P-399 1.00 m1 Pemasangan pipa galvanis diameter 4” 206,520 0.4 .
0.14 OH Pekerja 11,475 L.1
0.23 OH Tukang batu 22,500 L.3
0.02 OH Kepala tukang 3,450 L.9

Software RAB Exarch xPro 88/396


0.01 OH Mandor 1,295 L.10
1.20 M Pipa galvanis 4” 160,800 M.1175
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
A.5.1.1 25. P-400 1.00 m1 Pemasangan pipa PVC tipe AW diameter 1/2” 22,130 0.1 .
0.04 OH Pekerja 3,060 L.1
0.06 OH Tukang batu 6,000 L.3
0.01 OH Kepala tukang 900 L.9
0.00 OH Mandor 370 L.10
1.20 M Pipa PVC 1/2" 4,800 M.46
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
A.5.1.1 26. P-401 1.00 m1 Pemasangan pipa PVC tipe AW diameter 3/4” 23,930 0.1 .
0.04 OH Pekerja 3,060 L.1
0.06 OH Tukang batu 6,000 L.3
0.01 OH Kepala tukang 900 L.9
0.00 OH Mandor 370 L.10
1.20 M Pipa PVC 3/4" 6,600 M.50
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
A.5.1.1 27. P-402 1.00 m1 Pemasangan pipa PVC tipe AW diameter 1” 24,530 0.1 .
0.04 OH Pekerja 3,060 L.1
0.06 OH Tukang batu 6,000 L.3
0.01 OH Kepala tukang 900 L.9
0.00 OH Mandor 370 L.10
1.20 M Pipa PVC 1” 7,200 M.47
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
A.5.1.1 28. P-403 1.00 m1 Pemasangan pipa PVC tipe AW diameter 11/2” 30,295 0.2 .
0.05 OH Pekerja 4,590 L.1
0.09 OH Tukang batu 9,000 L.3
0.01 OH Kepala tukang 1,350 L.9
0.00 OH Mandor 555 L.10
1.20 M Pipa PVC 11/2” 7,800 M.1168
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
A.5.1.1 29. P-404 1.00 m1 Pemasangan pipa PVC tipe AW diameter 2” 30,895 0.2 .
0.05 OH Pekerja 4,590 L.1
0.09 OH Tukang batu 9,000 L.3
0.01 OH Kepala tukang 1,350 L.9
0.00 OH Mandor 555 L.10
1.20 M Pipa PVC 2” 8,400 M.48
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
A.5.1.1 30. P-405 1.00 m1 Pemasangan pipa PVC tipe AW diameter 21/2” 39,150 0.2 .
0.08 OH Pekerja 6,885 L.1
0.14 OH Tukang batu 13,500 L.3
0.01 OH Kepala tukang 2,025 L.9
0.00 OH Mandor 740 L.10
1.20 M Pipa PVC 21/2” 9,000 M.1169
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
A.5.1.1 31. P-406 1.00 m1 Pemasangan pipa PVC tipe AW diameter 3” 39,750 0.2 .
0.08 OH Pekerja 6,885 L.1
0.14 OH Tukang batu 13,500 L.3
0.01 OH Kepala tukang 2,025 L.9
0.00 OH Mandor 740 L.10
1.20 m1 Pipa PVC 3" 9,600 M.49
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
A.5.1.1 32. P-407 1.00 m1 Pemasangan pipa PVC tipe AW diameter 4” 40,950 0.2 .
0.08 OH Pekerja 6,885 L.1
0.14 OH Tukang batu 13,500 L.3
0.01 OH Kepala tukang 2,025 L.9
0.00 OH Mandor 740 L.10
1.20 m1 Pipa PVC 4" 10,800 M.51
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
A.5.1.1 33. P-408 1.00 m1 Pemasangan pipa air limbah jenis pipa tanah 138,410 0.1 .
0.08 OH Pekerja 6,800 L.1
0.04 OH Tukang batu 4,000 L.3

Software RAB Exarch xPro 89/396


0.00 OH Kepala tukang 600 L.9
0.00 OH Mandor 740 L.10
1.60 m Pipa tanah 74,400 M.1164
35.00 Kg Semen 45,500 M.12
0.01 M3 Pasir pasang 3,570 M.9
0.01 M3 Pasir urug 2,800 M.10
A.5.1.1 34. P-409 1.00 m1 Pemasangan pipa air limbah jenis pipa tanah diameter 1 89,904 0.1 .
0.06 OH Pekerja 5,100 L.1
0.03 OH Tukang batu 3,000 L.3
0.00 OH Kepala tukang 450 L.9
0.00 OH Mandor 555 L.10
1.60 Bh Pipa tanah 74,400 M.1164
0.68 Kg Semen 884 M.12
0.01 M3 Pasir pasang 3,315 M.9
0.01 M3 Pasir urug 2,200 M.10
A.5.1.1 35. P-410 1.00 m1 Pemasangan pipa beton diameter 15 - 20 cm 105,939 0.2 .
0.14 OH Pekerja 11,900 L.1
0.07 OH Tukang batu 7,000 L.3
0.01 OH Kepala tukang 1,050 L.9
0.01 OH Mandor 1,295 L.10
1.10 Bh Pipa Beton 60,500 M.1162
0.03 M3 Bata merah 18 M.2
3.92 Kg Semen 5,096 M.12
0.06 M3 Pasir pasang 14,280 M.9
0.02 M3 Pasir urug 4,800 M.10
A.5.1.1.36. P-411 1.00 m1 Pemasangan pipa beton diameter 30 - 100 cm 161,268 0.6 .
0.38 OH Pekerja 32,300 L.1
0.19 OH Tukang batu 19,000 L.3
0.02 OH Kepala tukang 2,850 L.9
0.02 OH Mandor 3,515 L.10
1.10 Bh Pipa Beton 60,500 M.1162
0.55 M3 Bata merah 358 M.2
10.30 Kg Semen 13,390 M.12
0.06 M3 Pasir pasang 15,555 M.9
0.07 M3 Pasir urug 13,800 M.10
A.8.4.1.1 P-412 1.00 m1 (K3) Pemasangan pipa PVC Ø 63 mm 98,300 0.1 .
0.08 OH Pekerja 6,885 L.1
0.04 OH Tukang pipa 4,100 L.8
0.01 OH Mandor 1,480 L.10
1.00 m Pipa PVC Ø 63 mm 83,000 M.1253
0.01 hari Sewa Tripot/Tackel & handle crane 2 T 2,835 A.29
A.8.4.1.2 P-413 1.00 m1 (K3) Pemasangan pipa PVC Ø 90 mm 120,135 0.2 .
0.09 OH Pekerja 7,990 L.1
0.05 OH Tukang pipa 4,700 L.8
0.01 OH Mandor 1,665 L.10
1.00 m Pipa PVC Ø 90 mm 102,000 M.1254
0.01 hari Sewa Tripot/Tackel & handle crane 2 T 3,780 A.29
A.8.4.1.3 P-414 1.00 m1 (K3) Pemasangan pipa PVC Ø 110 mm 152,985 0.2 .
0.11 OH Pekerja 8,925 L.1
0.05 OH Tukang pipa 5,300 L.8
0.01 OH Mandor 2,035 L.10
1.00 m Pipa PVC Ø 110 mm 132,000 M.1255
0.01 hari Sewa Tripot/Tackel & handle crane 2 T 4,725 A.29
A.8.4.1.4 P-415 1.00 m1 (K3) Pemasangan pipa PVC Ø 150 mm 188,820 0.2 .
0.12 OH Pekerja 10,030 L.1
0.06 OH Tukang pipa 5,900 L.8
0.01 OH Mandor 2,220 L.10
1.00 m Pipa PVC Ø 150 mm 165,000 M.1256
0.01 hari Sewa Tripot/Tackel & handle crane 2 T 5,670 A.29
A.8.4.1.5 P-416 1.00 m1 (K3) Pemasngan pipa PVC Ø 200 mm 365,420 0.3 .
0.19 OH Pekerja 16,065 L.1
0.10 OH Tukang pipa 9,500 L.8

Software RAB Exarch xPro 90/396


0.02 OH Mandor 3,515 L.10
1.00 m Pipa PVC Ø 200 mm 325,000 M.1257
0.02 hari Sewa Tripot/Tackel & handle crane 2 T 11,340 A.29
A.8.4.1.6 P-417 1.00 m1 (K3) Pemasangan pipa PVC Ø 250 mm 527,435 0.4 .
0.26 OH Pekerja 21,760 L.1
0.13 OH Tukang pipa 12,800 L.8
0.03 OH Mandor 4,810 L.10
1.00 m Pipa PVC Ø 250 mm 472,000 M.1258
0.03 hari Sewa Tripot/Tackel & handle crane 2 T 16,065 A.29
A.8.4.1.7 P-418 1.00 m1 (K3) Pemasangan pipa PVC Ø 300 mm 798,955 0.5 .
0.29 OH Pekerja 24,990 L.1
0.15 OH Tukang pipa 14,700 L.8
0.03 OH Mandor 5,365 L.10
1.00 m Pipa PVC Ø 300 mm 735,000 M.1259
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 18,900 A.29
A.8.4.1.8 P-419 1.00 m1 (K3) Pemasangan pipa PVC Ø 400 mm 1,473,230 0.9 .
0.54 OH Pekerja 46,240 L.1
0.27 OH Tukang pipa 27,200 L.8
0.05 OH Mandor 9,990 L.10
1.00 m Pipa PVC Ø 400 mm 1,352,000 M.1260
0.08 hari Sewa Tripot/Tackel & handle crane 2 T 37,800 A.29
A.8.4.1.9 P-420 1.00 m1 (K3) Pemasangan pipa PVC Ø 450 mm 1,750,010 1.1 .
0.67 OH Pekerja 56,865 L.1
0.34 OH Tukang pipa 33,500 L.8
0.07 OH Mandor 12,395 L.10
1.00 m Pipa PVC Ø 450 mm 1,600,000 M.1261
0.10 hari Sewa Tripot/Tackel & handle crane 2 T 47,250 A.29
A.8.4.1.10 P-421 1.00 m1 (K3) Pemasangan pipa PVC Ø 500 mm 2,481,895 1.3 .
0.81 OH Pekerja 68,765 L.1
0.41 OH Tukang pipa 40,500 L.8
0.08 OH Mandor 14,985 L.10
1.00 m Pipa PVC Ø 500 mm 2,300,000 M.1262
0.12 hari Sewa Tripot/Tackel & handle crane 2 T 57,645 A.29
A.8.4.1.11 P-422 1.00 m1 (K3) Pemasangan pipa PVC Ø 600 mm 3,815,518 1.5 .
0.96 OH Pekerja 81,345 L.1
0.48 OH Tukang pipa 47,900 L.8
0.10 OH Mandor 17,760 L.10
1.00 m Pipa PVC Ø 600 mm 3,600,000 M.1263
0.15 hari Sewa Tripot/Tackel & handle crane 2 T 68,513 A.29
A.8.4.1.12 P-423 1.00 m1 (K3) Pemasangan pipa PVC Ø 800 mm 5,266,525 2.6 .
1.62 OH Pekerja 137,530 L.1
0.81 OH Tukang pipa 80,900 L.8
0.16 OH Mandor 29,970 L.10
1.00 m Pipa PVC Ø 800 mm 4,900,000 M.1264
0.25 hari Sewa Tripot/Tackel & handle crane 2 T 118,125 A.29
A.8.4.1.13 P-424 1.00 m1 (K3) Pemasangan pipa PVC Ø 900 mm 6,583,395 2.7 .
1.69 OH Pekerja 143,735 L.1
0.85 OH Tukang pipa 84,600 L.8
0.17 OH Mandor 31,265 L.10
1.00 m Pipa PVC Ø 900 mm 6,200,000 M.1265
0.26 hari Sewa Tripot/Tackel & handle crane 2 T 123,795 A.29
A.8.4.1.14 P-425 1.00 m1 (K3) Pemasangan pipa PVC Ø 1000 mm 7,929,940 3.0 .
1.90 OH Pekerja 161,075 L.1
0.95 OH Tukang pipa 94,800 L.8
0.19 OH Mandor 35,150 L.10
1.00 m Pipa PVC Ø 1000 mm 7,500,000 M.1266
0.29 hari Sewa Tripot/Tackel & handle crane 2 T 138,915 A.29
A.8.4.1.15 P-426 1.00 m1 (K3) Pemasangan pipa PVC Ø 1100 mm 9,276,773 3.4 .
2.10 OH Pekerja 178,415 L.1
1.05 OH Tukang pipa 105,000 L.8
0.21 OH Mandor 38,850 L.10
1.00 m Pipa PVC Ø 1100 mm 8,800,000 M.1267

Software RAB Exarch xPro 91/396


0.33 hari Sewa Tripot/Tackel & handle crane 2 T 154,508 A.29
A.8.4.1.16 P-427 1.00 m1 (K3) Pemasangan pipa PVC Ø 1200 mm 10,623,133 3.7 .
2.30 OH Pekerja 195,755 L.1
1.15 OH Tukang pipa 115,200 L.8
0.23 OH Mandor 42,550 L.10
1.00 m Pipa PVC Ø 1200 mm 10,100,000 M.1268
0.36 hari Sewa Tripot/Tackel & handle crane 2 T 169,628 A.29
A.8.4.1.17 P-428 1.00 m1 (K3) Pemasangan pipa HDPE Ø 63 mm 69,208 0.1 .
0.04 OH Pekerja 2,975 L.1
0.02 OH Tukang pipa 1,700 L.8
0.00 OH Mandor 555 L.10
1.00 m Pipa HDPE Ø 63 mm 55,000 M.1223
0.02 hari Sewa Tripot/Tackel & handle crane 2 T 8,978 A.29
A.8.4.1.18 P-429 1.00 m1 (K3) Pemasangan pipa HDPE Ø 100 mm 139,118 0.1 .
0.04 OH Pekerja 3,400 L.1
0.02 OH Tukang pipa 2,000 L.8
0.00 OH Mandor 740 L.10
1.00 m Pipa HDPE Ø 100 mm 124,000 M.1224
0.02 hari Sewa Tripot/Tackel & handle crane 2 T 8,978 A.29
A.8.4.1.19 P-430 1.00 m1 (K3) Pemasangan pipa HDPE Ø 125 mm 254,028 0.1 .
0.05 OH Pekerja 3,825 L.1
0.02 OH Tukang pipa 2,300 L.8
0.01 OH Mandor 925 L.10
1.00 m Pipa HDPE Ø 125 mm 238,000 M.1225
0.02 hari Sewa Tripot/Tackel & handle crane 2 T 8,978 A.29
A.8.4.1.20 P-431 1.00 m1 (K3) Pemasangan pipa HDPE Ø 150 mm 314,458 0.1 .
0.06 OH Pekerja 5,270 L.1
0.03 OH Tukang pipa 3,100 L.8
0.01 OH Mandor 1,110 L.10
1.00 m Pipa HDPE Ø 150 mm 296,000 M.1226
0.02 hari Sewa Tripot/Tackel & handle crane 2 T 8,978 A.29
A.8.4.1.21 P-432 1.00 m1 (K3) Pemasangan pipa HDPE Ø 200 mm 631,598 0.2 .
0.10 OH Pekerja 8,670 L.1
0.05 OH Tukang pipa 5,100 L.8
0.01 OH Mandor 1,850 L.10
1.00 m Pipa HDPE Ø 200 mm 607,000 M.1227
0.02 hari Sewa Tripot/Tackel & handle crane 2 T 8,978 A.29
A.8.4.1.22 P-433 1.00 m1 (K3) Pemasangan pipa HDPE Ø 250 mm 986,255 0.2 .
0.13 OH Pekerja 11,305 L.1
0.07 OH Tukang pipa 6,700 L.8
0.01 OH Mandor 2,405 L.10
1.00 m Pipa HDPE Ø 250 mm 946,000 M.1228
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 19,845 A.29
A.8.4.1.23 P-434 1.00 m1 (K3) Pemasangan pipa HDPE Ø 300 mm 1,576,808 0.3 .
0.17 OH Pekerja 14,450 L.1
0.09 OH Tukang pipa 8,500 L.8
0.02 OH Mandor 3,145 L.10
1.00 m Pipa HDPE Ø 300 mm 1,520,000 M.1229
0.07 hari Sewa Tripot/Tackel & handle crane 2 T 30,713 A.29
A.8.4.1.24 P-435 1.00 m1 (K3) Pemasangan pipa HDPE Ø 400 mm 2,534,335 0.5 .
0.29 OH Pekerja 24,650 L.1
0.15 OH Tukang pipa 14,500 L.8
0.03 OH Mandor 5,365 L.10
1.00 m Pipa HDPE Ø 400 mm 2,418,000 M.1230
0.15 hari Sewa Tripot/Tackel & handle crane 2 T 71,820 A.29
A.8.4.1.25 P-436 1.00 m1 (K3) Pemasangan pipa HDPE Ø 450 mm 3,212,675 0.6 .
0.36 OH Pekerja 30,515 L.1
0.18 OH Tukang pipa 18,000 L.8
0.04 OH Mandor 6,660 L.10
1.00 m Pipa HDPE Ø 450 mm 3,063,000 M.1231
0.20 hari Sewa Tripot/Tackel & handle crane 2 T 94,500 A.29
A.8.4.1.26 P-437 1.00 m1 (K3) Pemasangan pipa HDPE Ø 500 mm 3,884,958 0.7 .

Software RAB Exarch xPro 92/396


0.43 OH Pekerja 36,805 L.1
0.22 OH Tukang pipa 21,600 L.8
0.04 OH Mandor 7,955 L.10
1.00 m Pipa HDPE Ø 500 mm 3,700,000 M.1232
0.25 hari Sewa Tripot/Tackel & handle crane 2 T 118,598 A.29
A.8.4.1.27 P-438 1.00 m1 (K3) Pemasangan pipa HDPE Ø 600 mm 3,923,613 0.8 .
0.51 OH Pekerja 43,520 L.1
0.26 OH Tukang pipa 25,600 L.8
0.05 OH Mandor 9,435 L.10
1.00 m Pipa HDPE Ø 500 mm 3,700,000 M.1232
0.31 hari Sewa Tripot/Tackel & handle crane 2 T 145,058 A.29
A.8.4.1.28 P-439 1.00 m1 (K3) Pemasangan pipa HDPE Ø 800 mm 9,107,713 1.4 .
0.89 OH Pekerja 75,905 L.1
0.45 OH Tukang pipa 44,600 L.8
0.09 OH Mandor 16,465 L.10
1.00 m Pipa HDPE Ø 800 mm 8,700,000 M.1234
0.57 hari Sewa Tripot/Tackel & handle crane 2 T 270,743 A.29
A.8.4.1.29 P-440 1.00 m1 (K3) Pemasangan pipa HDPE Ø 900 mm 10,424,898 2.2 .
1.35 OH Pekerja 115,005 L.1
0.68 OH Tukang pipa 67,700 L.8
0.14 OH Mandor 24,975 L.10
1.00 m Pipa HDPE Ø 900 mm 9,800,000 M.1235
0.88 hari Sewa Tripot/Tackel & handle crane 2 T 417,218 A.29
A.8.4.1.30 P-441 1.00 m1 (K3) Pemasangan pipa HDPE Ø 1000 mm 12,271,168 2.7 .
1.66 OH Pekerja 141,015 L.1
0.83 OH Tukang pipa 83,000 L.8
0.17 OH Mandor 30,710 L.10
1.00 m Pipa HDPE Ø 1000 mm 11,500,000 M.1237
1.09 hari Sewa Tripot/Tackel & handle crane 2 T 516,443 A.29
A.8.4.1.31 P-442 1.00 m1 (K3) Pemasangan pipa HDPE Ø 1100 mm 12,348,463 2.9 .
1.82 OH Pekerja 154,530 L.1
0.91 OH Tukang pipa 90,900 L.8
0.18 OH Mandor 33,670 L.10
1.00 m Pipa HDPE Ø 1100 mm 11,500,000 M.1239
1.21 hari Sewa Tripot/Tackel & handle crane 2 T 569,363 A.29
A.8.4.1.32 P-443 1.00 m1 (K3) Pemasangan pipa HDPE Ø 1200 mm 13,612,235 3.8 .
2.37 OH Pekerja 201,450 L.1
1.19 OH Tukang pipa 118,500 L.8
0.24 OH Mandor 43,845 L.10
1.00 m Pipa HDPE Ø 1200 mm 12,500,000 M.1240
1.58 hari Sewa Tripot/Tackel & handle crane 2 T 748,440 A.29
A.8.4.1.33 P-444 1.00 m1 (K3) Pemasangan pipa GIP Ø 63 mm 220,770 0.6 .
0.35 OH Pekerja 29,325 L.1
0.17 OH Tukang pipa 17,200 L.8
0.03 OH Mandor 6,290 L.10
1.00 m Pipa GIP Ø 63 mm 150,000 M.1207
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 17,955 A.29
A.8.4.1.34 P-445 1.00 m1 (K3) Pemasangan pipa GIP Ø 100 mm 298,355 0.6 .
0.40 OH Pekerja 34,000 L.1
0.20 OH Tukang pipa 20,000 L.8
0.04 OH Mandor 7,400 L.10
1.00 m Pipa GIP Ø 100 mm 219,000 M.1208
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 17,955 A.29
A.8.4.1.35 P-446 1.00 m1 (K3) Pemasangan pipa GIP Ø 125 mm 362,385 0.7 .
0.45 OH Pekerja 38,080 L.1
0.22 OH Tukang pipa 22,400 L.8
0.05 OH Mandor 8,325 L.10
1.00 m Pipa GIP Ø 125 mm 275,625 M.1209
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 17,955 A.29
A.8.4.1.36 P-447 1.00 m1 (K3) Pemasangan pipa GIP Ø 150 mm 428,340 0.8 .
0.51 OH Pekerja 43,010 L.1
0.25 OH Tukang pipa 25,300 L.8

Software RAB Exarch xPro 93/396


0.05 OH Mandor 9,435 L.10
1.00 m Pipa GIP Ø 150 mm 330,750 M.1210
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 19,845 A.29
A.8.4.1.37 P-448 1.00 m1 (K3) Pemasangan pipa GIP Ø 200 mm 583,105 1.3 .
0.80 OH Pekerja 67,660 L.1
0.40 OH Tukang pipa 39,800 L.8
0.08 OH Mandor 14,800 L.10
1.00 m Pipa GIP Ø 200 mm 441,000 M.1211
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 19,845 A.29
A.8.4.1.38 P-449 1.00 m1 (K3) Pemasangan pipa GIP Ø 250 mm 716,835 1.5 .
0.95 OH Pekerja 80,665 L.1
0.48 OH Tukang pipa 47,500 L.8
0.10 OH Mandor 17,575 L.10
1.00 m Pipa GIP Ø 250 mm 551,250 M.1212
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 19,845 A.29
A.8.4.1.39 P-450 1.00 m1 (K3) Pemasangan pipa GIP Ø 300 mm 828,435 1.5 .
0.96 OH Pekerja 81,430 L.1
0.48 OH Tukang pipa 47,900 L.8
0.10 OH Mandor 17,760 L.10
1.00 m Pipa GIP Ø 300 mm 661,500 M.1213
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 19,845 A.29
A.8.4.1.40 P-451 1.00 m1 (K3) Pemasangan pipa GIP Ø 400 mm 1,095,174 1.9 .
1.21 OH Pekerja 103,020 L.1
0.61 OH Tukang pipa 60,600 L.8
0.12 OH Mandor 22,385 L.10
1.00 m Pipa GIP Ø 400 mm 882,000 M.1214
0.06 hari Sewa Tripot/Tackel & handle crane 2 T 27,169 A.29
A.8.4.1.41 P-452 1.00 m1 (K3) Pemasangan pipa GIP Ø 450 mm 1,226,999 2.2 .
1.35 OH Pekerja 115,005 L.1
0.68 OH Tukang pipa 67,600 L.8
0.14 OH Mandor 24,975 L.10
1.00 m Pipa GIP Ø 450 mm 992,250 M.1215
0.06 hari Sewa Tripot/Tackel & handle crane 2 T 27,169 A.29
A.8.4.1.42 P-453 1.00 m1 (K3) Pemasangan pipa GIP Ø 500 mm 1,364,285 2.4 .
1.47 OH Pekerja 124,865 L.1
0.74 OH Tukang pipa 73,500 L.8
0.15 OH Mandor 27,195 L.10
1.00 m Pipa GIP Ø 500 mm 1,102,500 M.1216
0.08 hari Sewa Tripot/Tackel & handle crane 2 T 36,225 A.29
A.8.4.1.43 P-454 1.00 m1 (K3) Pemasangan pipa GIP Ø 600 mm 1,563,025 2.1 .
1.33 OH Pekerja 112,795 L.1
0.66 OH Tukang pipa 66,400 L.8
0.13 OH Mandor 24,605 L.10
1.00 m Pipa GIP Ø 600 mm 1,323,000 M.1217
0.08 hari Sewa Tripot/Tackel & handle crane 2 T 36,225 A.29
A.8.4.1.44 P-455 1.00 m1 (K3) Pemasangan pipa GIP Ø 800 mm 2,161,953 3.7 .
2.33 OH Pekerja 197,795 L.1
1.16 OH Tukang pipa 116,300 L.8
0.23 OH Mandor 43,105 L.10
1.00 m Pipa GIP Ø 800 mm 1,764,000 M.1218
0.09 hari Sewa Tripot/Tackel & handle crane 2 T 40,753 A.29
A.8.4.1.45 P-456 1.00 m1 (K3) Pemasangan pipa GIP Ø 900 mm 2,427,878 4.2 .
2.62 OH Pekerja 222,955 L.1
1.31 OH Tukang pipa 131,200 L.8
0.26 OH Mandor 48,470 L.10
1.00 m Pipa GIP Ø 900 mm 1,984,500 M.1219
0.09 hari Sewa Tripot/Tackel & handle crane 2 T 40,753 A.29
A.8.4.1.46 P-457 1.00 m1 (K3) Pemasangan pipa GIP Ø 1000 mm 2,692,623 4.7 .
2.91 OH Pekerja 247,435 L.1
1.46 OH Tukang pipa 145,600 L.8
0.29 OH Mandor 53,835 L.10
1.00 m Pipa GIP Ø 1000 mm 2,205,000 M.1220

Software RAB Exarch xPro 94/396


0.09 hari Sewa Tripot/Tackel & handle crane 2 T 40,753 A.29
A.8.4.1.47 P-458 1.00 m1 (K3) Pemasangan pipa GIP Ø 1100 mm 2,957,453 5.1 .
3.20 OH Pekerja 272,000 L.1
1.60 OH Tukang pipa 160,000 L.8
0.32 OH Mandor 59,200 L.10
1.00 m Pipa GIP Ø 1100 mm 2,425,500 M.1221
0.09 hari Sewa Tripot/Tackel & handle crane 2 T 40,753 A.29
A.8.4.1.48 P-459 1.00 m1 (K3) Pemasangan pipa GIP Ø 1200 mm 2,955,366 2.4 .
0.35 OH Pekerja 29,648 L.1
1.74 OH Tukang pipa 174,400 L.8
0.35 OH Mandor 64,565 L.10
1.00 m Pipa GIP Ø 1200 mm 2,646,000 M.1222
0.09 hari Sewa Tripot/Tackel & handle crane 2 T 40,753 A.29
A.8.4.1.49 P-460 1.00 m1 (K3) Pemasangan pipa DCI Ø 100 mm 376,980 0.6 .
0.49 OH Pekerja 41,565 L.1
0.10 OH Tukang pipa 9,800 L.8
0.05 OH Mandor 9,065 L.10
1.00 m Pipa DCI Ø 100 mm 137,000 M.1192
0.38 hari Sewa Tripot/Tackel & handle crane 2 T 179,550 A.29
A.8.4.1.50 P-461 1.00 m1 (K3) Pemasangan pipa DCI Ø 125 mm 447,120 0.7 .
0.55 OH Pekerja 46,495 L.1
0.11 OH Tukang pipa 10,900 L.8
0.06 OH Mandor 10,175 L.10
1.00 m Pipa DCI Ø 125 mm 200,000 M.1193
0.38 hari Sewa Tripot/Tackel & handle crane 2 T 179,550 A.29
A.8.4.1.51 P-462 1.00 m1 (K3) Pemasangan pipa DCI Ø 150 mm 564,240 0.8 .
0.61 OH Pekerja 52,105 L.1
0.12 OH Tukang pipa 12,300 L.8
0.06 OH Mandor 11,285 L.10
1.00 m Pipa DCI Ø 150 mm 309,000 M.1194
0.38 hari Sewa Tripot/Tackel & handle crane 2 T 179,550 A.29
A.8.4.1.52 P-463 1.00 m1 (K3) Pemasangan pipa DCI Ø 200 mm 835,050 1.1 .
0.86 OH Pekerja 72,675 L.1
0.17 OH Tukang pipa 17,100 L.8
0.09 OH Mandor 15,725 L.10
1.00 M Pipa DCI Ø 200 mm 550,000 M.1195
0.38 hari Sewa Tripot/Tackel & handle crane 2 T 179,550 A.29
A.8.4.1.53 P-464 1.00 m1 (K3) Pemasangan pipa DCI Ø 250 mm 915,035 1.2 .
0.95 OH Pekerja 80,835 L.1
0.19 OH Tukang pipa 19,000 L.8
0.10 OH Mandor 17,575 L.10
1.00 M Pipa DCI Ø 250 mm 774,000 M.1196
0.05 hari Sewa Tripot/Tackel & handle crane 2 T 23,625 A.29
A.8.4.1.54 P-465 1.00 m1 (K3) Pemasangan pipa DCI Ø 300 mm 1,203,698 1.3 .
0.97 OH Pekerja 82,705 L.1
0.20 OH Tukang pipa 19,500 L.8
0.10 OH Mandor 17,945 L.10
1.00 m Pipa DCI Ø 300 mm 1,050,000 M.1197
0.07 hari Sewa Tripot/Tackel & handle crane 2 T 33,548 A.29
A.8.4.1.55 P-466 1.00 m1 (K3) Pemasangan pipa DCI Ø 400 mm 2,657,205 2.1 .
1.55 OH Pekerja 131,325 L.1
0.31 OH Tukang pipa 30,900 L.8
0.09 OH Operator alat berat 12,237 L.21
0.15 OH Mandor 28,490 L.10
1.00 m Pipa DCI Ø 400 mm 2,400,000 M.1198
0.02 hari Sewa excavator type 225 kap 0,5 -1,0 m3 39,606 A.25
0.03 hari Sewa Tripot/Tackel & handle crane 2 T 14,648 A.29
A.8.4.1.56 P-467 1.00 m1 (K3) Pemasangan pipa DCI Ø 450 mm 3,111,071 2.5 .
1.81 OH Pekerja 154,105 L.1
0.36 OH Tukang pipa 36,300 L.8
0.14 OH Operator alat berat 18,816 L.21
0.18 OH Mandor 33,485 L.10

Software RAB Exarch xPro 95/396


1.00 m Pipa DCI Ø 450 mm 2,800,000 M.1199
0.03 hari Sewa excavator type 225 kap 0,5 -1,0 m3 49,938 A.25
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 18,428 A.29
A.8.4.1.57 P-468 1.00 m1 (K3) Pemasangan pipa DCI Ø 500 mm 3,558,025 2.9 .
2.05 OH Pekerja 173,995 L.1
0.41 OH Tukang pipa 40,900 L.8
0.19 OH Operator alat berat 25,394 L.21
0.21 OH Mandor 37,925 L.10
1.00 m Pipa DCI Ø 500 mm 3,200,000 M.1200
0.03 hari Sewa excavator type 225 kap 0,5 -1,0 m3 58,548 A.25
0.05 hari Sewa Tripot/Tackel & handle crane 2 T 21,263 A.29
A.8.4.1.58 P-469 1.00 m1 (K3) Pemasangan pipa DCI Ø 600 mm 4,023,131 2.9 .
2.01 OH Pekerja 170,935 L.1
0.40 OH Tukang pipa 40,200 L.8
0.29 OH Operator alat berat 38,552 L.21
0.20 OH Mandor 37,185 L.10
1.00 m Pipa DCI Ø 600 mm 3,600,000 M.1201
0.06 hari Sewa excavator type 225 kap 0,5 -1,0 m3 99,876 A.25
0.08 hari Sewa Tripot/Tackel & handle crane 2 T 36,383 A.29
A.8.4.1.59 P-470 1.00 m1 (K3) Pemasangan pipa DCI Ø800 mm 5,592,453 5.5 .
3.86 OH Pekerja 328,015 L.1
0.77 OH Tukang pipa 77,200 L.8
0.49 OH Operator alat berat 64,868 L.21
0.39 OH Mandor 71,410 L.10
1.00 m Pipa DCI Ø 800 mm 4,800,000 M.1202
0.08 hari Sewa excavator type 225 kap 0,5 -1,0 m3 144,648 A.25
0.23 hari Sewa Tripot/Tackel & handle crane 2 T 106,313 A.29
A.8.4.1.60 P-471 1.00 m1 (K3) Pemasangan pipa DCI Ø900 mm 6,072,142 7.1 .
5.00 OH Pekerja 424,575 L.1
1.00 OH Tukang pipa 99,900 L.8
0.59 OH Operator alat berat 78,026 L.21
0.50 OH Mandor 92,315 L.10
1.00 m Pipa DCI Ø 900 mm 5,100,000 M.1203
0.09 hari Sewa excavator type 225 kap 0,5 -1,0 m3 160,146 A.25
0.25 hari Sewa Tripot/Tackel & handle crane 2 T 117,180 A.29
A.8.4.1.61 P-472 1.00 m1 (K3) Pemasangan pipa DCI Ø1000 mm 7,188,950 8.6 .
5.93 OH Pekerja 504,135 L.1
1.19 OH Tukang pipa 118,600 L.8
0.79 OH Operator alat berat 104,341 L.21
0.69 OH Mandor 128,205 L.10
1.00 m Pipa DCI Ø 1000 mm 6,000,000 M.1204
0.11 hari Sewa excavator type 225 kap 0,5 -1,0 m3 192,864 A.25
0.30 hari Sewa Tripot/Tackel & handle crane 2 T 140,805 A.29
A.8.4.1.62 P-473 1.00 m1 (K3) Pemasangan pipa DCI Ø1100 mm 7,867,965 9.8 .
6.95 OH Pekerja 590,665 L.1
1.39 OH Tukang pipa 139,000 L.8
0.79 OH Operator alat berat 104,341 L.21
0.70 OH Mandor 128,575 L.10
1.00 m Pipa DCI Ø 1100 mm 6,500,000 M.1205
0.15 hari Sewa excavator type 225 kap 0,5 -1,0 m3 261,744 A.25
0.30 hari Sewa Tripot/Tackel & handle crane 2 T 143,640 A.29
A.8.4.1.63 P-474 1.00 m1 (K3) Pemasangan pipa DCI Ø1200 mm 8,892,529 11.4 .
8.06 OH Pekerja 684,760 L.1
1.61 OH Tukang pipa 161,100 L.8
0.89 OH Operator alat berat 117,499 L.21
0.81 OH Mandor 149,110 L.10
1.00 m Pipa DCI Ø 1200 mm 7,300,000 M.1206
0.18 hari Sewa excavator type 225 kap 0,5 -1,0 m3 309,960 A.25
0.36 hari Sewa Tripot/Tackel & handle crane 2 T 170,100 A.29
A.8.4.1.64 P-475 1.00 m1 (K3) Pemasangan pipa baja Ø 63 mm 271,888 0.6 .
0.50 OH Pekerja 42,415 L.1
0.10 OH Tukang pipa 10,000 L.8

Software RAB Exarch xPro 96/396


0.05 OH Mandor 9,250 L.10
1.00 m Pipa Baja Ø 63 mm 208,333 M.1176
0.00 hari Sewa Tripot/Tackel & handle crane 2 T 1,890 A.29
A.8.4.1.65 P-476 1.00 m1 (K3) Pemasangan pipa baja Ø 100 mm 448,435 0.8 .
0.58 OH Pekerja 49,215 L.1
0.12 OH Tukang pipa 11,600 L.8
0.06 OH Mandor 10,730 L.10
1.00 m Pipa Baja Ø 100 mm 375,000 M.1177
0.00 hari Sewa Tripot/Tackel & handle crane 2 T 1,890 A.29
A.8.4.1.66 P-477 1.00 m1 (K3) Pemasangan pipa baja Ø 125 mm 290,328 0.8 .
0.65 OH Pekerja 55,080 L.1
0.13 OH Tukang pipa 13,000 L.8
0.07 OH Mandor 12,025 L.10
1.00 m Pipa Baja Ø 125 mm 208,333 M.1178
0.00 hari Sewa Tripot/Tackel & handle crane 2 T 1,890 A.29
A.8.4.1.67 P-478 1.00 m1 (K3) Pemasangan pipa baja Ø 150 mm 213,405 0.9 .
0.71 OH Pekerja 60,180 L.1
0.14 OH Tukang pipa 14,200 L.8
0.07 OH Mandor 13,135 L.10
1.00 m Pipa Baja Ø 150 mm 124,000 M.1179
0.00 hari Sewa Tripot/Tackel & handle crane 2 T 1,890 A.29
A.8.4.1.68 P-479 1.00 m1 (K3) Pemasangan pipa baja Ø 200 mm 353,330 1.4 .
1.11 OH Pekerja 94,605 L.1
0.22 OH Tukang pipa 22,300 L.8
0.11 OH Mandor 20,535 L.10
1.00 m Pipa Baja Ø 200 mm 214,000 M.1180
0.00 hari Sewa Tripot/Tackel & handle crane 2 T 1,890 A.29
A.8.4.1.69 P-480 1.00 m1 (K3) Pemasangan pipa baja Ø 250 mm 427,620 1.7 .
1.33 OH Pekerja 112,625 L.1
0.27 OH Tukang pipa 26,500 L.8
0.13 OH Mandor 24,605 L.10
1.00 m Pipa Baja Ø 250 mm 262,000 M.1181
0.00 hari Sewa Tripot/Tackel & handle crane 2 T 1,890 A.29
A.8.4.1.70 P-481 1.00 m1 (K3) Pemasangan pipa baja Ø 300 mm 491,550 1.8 .
1.42 OH Pekerja 120,275 L.1
0.28 OH Tukang pipa 28,300 L.8
0.14 OH Mandor 26,085 L.10
1.00 m Pipa Baja Ø 300 mm 315,000 M.1182
0.00 hari Sewa Tripot/Tackel & handle crane 2 T 1,890 A.29
A.8.4.1.71 P-482 1.00 m1 (K3) Pemasangan pipa baja Ø 400 mm 777,177 3.1 .
2.37 OH Pekerja 201,110 L.1
0.47 OH Tukang pipa 47,300 L.8
0.24 OH Mandor 43,845 L.10
1.00 m Pipa Baja Ø 400 mm 420,000 M.1183
0.03 hari Sewa excavator type 225 kap 0,5 -1,0 m3 46,494 A.25
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 18,428 A.29
A.8.4.1.72 P-483 1.00 m1 (K3) Pemasangan pipa baja Ø 450 mm 809,745 2.9 .
2.23 OH Pekerja 189,635 L.1
0.45 OH Tukang pipa 44,600 L.8
0.22 OH Mandor 41,255 L.10
1.00 m Pipa Baja Ø 450 mm 472,000 M.1184
0.03 hari Sewa excavator type 225 kap 0,5 -1,0 m3 44,772 A.25
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 17,483 A.29
A.8.4.1.73 P-484 1.00 m1 (K3) Pemasangan pipa baja Ø 500 mm 896,476 3.2 .
2.43 OH Pekerja 206,720 L.1
0.49 OH Tukang pipa 48,600 L.8
0.24 OH Mandor 44,955 L.10
1.00 m Pipa Baja Ø 500 mm 525,000 M.1185
0.03 hari Sewa excavator type 225 kap 0,5 -1,0 m3 49,938 A.25
0.05 hari Sewa Tripot/Tackel & handle crane 2 T 21,263 A.29
A.8.4.1.74 P-485 1.00 m1 (K3) Pemasangan pipa baja Ø 600 mm 972,687 2.9 .
2.21 OH Pekerja 187,680 L.1

Software RAB Exarch xPro 97/396


0.44 OH Tukang pipa 44,200 L.8
0.22 OH Mandor 40,885 L.10
1.00 m Pipa Baja Ø 600 mm 635,000 M.1186
0.03 hari Sewa excavator type 225 kap 0,5 -1,0 m3 46,494 A.25
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 18,428 A.29
A.8.4.1.75 P-486 1.00 m1 (K3) Pemasangan pipa baja Ø 800 mm 1,446,812 5.1 .
3.90 OH Pekerja 331,245 L.1
0.78 OH Tukang pipa 77,900 L.8
0.39 OH Mandor 72,150 L.10
1.00 m Pipa Baja Ø 800 mm 840,000 M.1187
0.05 hari Sewa excavator type 225 kap 0,5 -1,0 m3 79,212 A.25
0.10 hari Sewa Tripot/Tackel & handle crane 2 T 46,305 A.29
A.8.4.1.76 P-487 1.00 m1 (K3) Pemasangan pipa baja Ø 900 mm 1,552,637 4.9 .
4.40 OH Pekerja 374,255 L.1
0.08 OH Tukang pipa 8,100 L.8
0.44 OH Mandor 81,400 L.10
1.00 m Pipa Baja Ø 900 mm 945,000 M.1188
0.05 hari Sewa excavator type 225 kap 0,5 -1,0 m3 89,544 A.25
0.12 hari Sewa Tripot/Tackel & handle crane 2 T 54,338 A.29
A.8.4.1.77 P-488 1.00 m1 (K3) Pemasangan pipa baja Ø 1000 mm 1,967,159 6.4 .
4.90 OH Pekerja 416,075 L.1
0.98 OH Tukang pipa 97,900 L.8
0.49 OH Mandor 90,465 L.10
1.00 m Pipa Baja Ø 1000 mm 1,200,000 M.1189
0.06 hari Sewa excavator type 225 kap 0,5 -1,0 m3 99,876 A.25
0.13 hari Sewa Tripot/Tackel & handle crane 2 T 62,843 A.29
A.8.4.1.78 P-489 1.00 m1 (K3) Pemasangan pipa baja Ø 1100 mm 2,096,393 7.0 .
5.39 OH Pekerja 457,895 L.1
1.08 OH Tukang pipa 107,700 L.8
0.54 OH Mandor 99,715 L.10
1.00 m Pipa Baja Ø 1100 mm 1,250,000 M.1190
0.06 hari Sewa excavator type 225 kap 0,5 -1,0 m3 110,208 A.25
0.15 hari Sewa Tripot/Tackel & handle crane 2 T 70,875 A.29
A.8.4.1.79 P-490 1.00 m1 (K3) Pemasangan pipa baja Ø 1200 mm 2,227,073 7.7 .
5.90 OH Pekerja 501,245 L.1
1.18 OH Tukang pipa 117,600 L.8
0.59 OH Mandor 108,780 L.10
1.00 m Pipa Baja Ø 1200 mm 1,300,000 M.1191
0.07 hari Sewa excavator type 225 kap 0,5 -1,0 m3 120,540 A.25
0.17 hari Sewa Tripot/Tackel & handle crane 2 T 78,908 A.29
A.8.4.2.1 P-491 1.00 m1 (K3) Pemotongan pipa PVC Ø 63 mm 84,438 0.0 .
0.01 OH Pekerja 425 L.1
0.00 OH Tukang pipa 200 L.8
0.00 OH Mandor 93 L.10
1.00 bh Pipa PVC Ø 63 mm 83,000 M.1253
0.00 hari Bahan potong pipa T1/manual (gergaji) /saw 720 A.8
A.8.4.2.2 P-492 1.00 m1 (K3) Pemotongan pipa PVC Ø 90 mm 104,795 0.0 .
0.01 OH Pekerja 1,190 L.1
0.01 OH Tukang pipa 700 L.8
0.00 OH Mandor 185 L.10
1.00 bh Pipa PVC Ø 90 mm 102,000 M.1254
0.00 hari Bahan potong pipa T1/manual (gergaji) /saw 720 A.8
A.8.4.2.3 P-493 1.00 bh (K3) Pemotongan pipa PVC Ø 110 mm 136,060 0.0 .
0.02 OH Pekerja 1,870 L.1
0.01 OH Tukang pipa 1,100 L.8
0.00 OH Mandor 370 L.10
1.00 bh Pipa PVC Ø 110 mm 132,000 M.1255
0.00 hari Bahan potong pipa T1/manual (gergaji) /saw 720 A.8
A.8.4.2.4 P-494 1.00 bh (K3) Pemotongan pipa PVC Ø 150 mm 170,410 0.0 .
0.03 OH Pekerja 2,635 L.1
0.02 OH Tukang pipa 1,500 L.8
0.00 OH Mandor 555 L.10

Software RAB Exarch xPro 98/396


1.00 bh Pipa PVC Ø 150 mm 165,000 M.1256
0.00 hari Bahan potong pipa T1/manual (gergaji) /saw 720 A.8
A.8.4.2.5 P-495 1.00 bh (K3) Pemotongan pipa PVC Ø 200 mm 341,445 0.1 .
0.08 OH Pekerja 6,885 L.1
0.04 OH Tukang pipa 4,000 L.8
0.01 OH Mandor 1,480 L.10
1.00 bh Pipa PVC Ø 200 mm 325,000 M.1257
0.02 hari Bahan potong pipa T1/manual (gergaji) /saw 4,080 A.8
A.8.4.2.6 P-496 1.00 bh (K3) Pemotongan pipa PVC Ø 250 mm 498,885 0.2 .
0.13 OH Pekerja 10,880 L.1
0.06 OH Tukang pipa 6,400 L.8
0.01 OH Mandor 2,405 L.10
1.00 bh Pipa PVC Ø 250 mm 472,000 M.1258
0.03 hari Bahan potong pipa T1/manual (gergaji) /saw 7,200 A.8
A.8.4.2.7 P-497 1.00 bh (K3) Pemotongan pipa PVC Ø 300 mm 767,530 0.2 .
0.16 OH Pekerja 13,175 L.1
0.08 OH Tukang pipa 7,700 L.8
0.02 OH Mandor 2,775 L.10
1.00 bh Pipa PVC Ø 300 mm 735,000 M.1259
0.04 hari Bahan potong pipa T1/manual (gergaji) /saw 8,880 A.8
A.8.4.2.8 P-498 1.00 bh (K3) Pemotongan pipa PVC Ø 400 mm 1,423,480 0.5 .
0.33 OH Pekerja 28,135 L.1
0.17 OH Tukang pipa 16,600 L.8
0.03 OH Mandor 6,105 L.10
1.00 bh Pipa PVC Ø 400 mm 1,352,000 M.1260
0.09 hari Bahan potong pipa T1/manual (gergaji) /saw 20,640 A.8
A.8.4.2.9 P-499 1.00 bh (K3) Pemotongan pipa PVC Ø 450 mm 1,699,570 0.7 .
0.42 OH Pekerja 35,700 L.1
0.21 OH Tukang pipa 21,000 L.8
0.04 OH Mandor 7,770 L.10
1.00 bh Pipa PVC Ø 450 mm 1,600,000 M.1261
0.05 hari Bahan potong pipa T2/mekanik / cilinder 35,100 A.9
A.8.4.2.10 P-500 1.00 bh (K3) Pemotongan pipa PVC Ø 500 mm 2,424,400 0.8 .
0.52 OH Pekerja 44,030 L.1
0.26 OH Tukang pipa 25,900 L.8
0.05 OH Mandor 9,620 L.10
1.00 bh Pipa PVC Ø 500 mm 2,300,000 M.1262
0.07 hari Bahan potong pipa T2/mekanik / cilinder 44,850 A.9
A.8.4.2.11 P-501 1.00 bh (K3) Pemotongan pipa PVC Ø 600 mm 3,751,425 1.0 .
0.62 OH Pekerja 52,955 L.1
0.31 OH Tukang pipa 31,100 L.8
0.06 OH Mandor 11,470 L.10
1.00 bh Pipa PVC Ø 600 mm 3,600,000 M.1263
0.09 hari Bahan potong pipa T2/mekanik / cilinder 55,900 A.9
A.8.4.2.12 P-502 1.00 bh (K3) Pemotongan pipa PVC Ø 800 mm 5,171,230 1.7 .
1.09 OH Pekerja 92,565 L.1
0.55 OH Tukang pipa 54,500 L.8
0.11 OH Mandor 20,165 L.10
1.00 bh Pipa PVC Ø 800 mm 4,900,000 M.1264
0.16 hari Bahan potong pipa T2/mekanik / cilinder 104,000 A.9
A.8.4.2.13 P-503 1.00 bh (K3) Pemotongan pipa PVC Ø 900 mm 6,484,375 1.8 .
1.14 OH Pekerja 96,985 L.1
0.57 OH Tukang pipa 57,100 L.8
0.11 OH Mandor 21,090 L.10
1.00 bh Pipa PVC Ø 900 mm 6,200,000 M.1265
0.17 hari Bahan potong pipa T2/mekanik / cilinder 109,200 A.9
A.8.4.2.14 P-504 1.00 bh (K3) Pemotongan pipa PVC Ø 1000 mm 7,821,540 2.1 .
1.29 OH Pekerja 109,225 L.1
0.64 OH Tukang pipa 64,300 L.8
0.13 OH Mandor 23,865 L.10
1.00 bh Pipa PVC Ø 1000 mm 7,500,000 M.1266
0.19 hari Bahan potong pipa T2/mekanik / cilinder 124,150 A.9

Software RAB Exarch xPro 99/396


A.8.4.2.15 P-505 1.00 bh (K3) Pemotongan pipa PVC Ø 1100 mm 9,157,870 2.3 .
1.43 OH Pekerja 121,465 L.1
0.72 OH Tukang pipa 71,500 L.8
0.14 OH Mandor 26,455 L.10
1.00 bh Pipa PVC Ø 1100 mm 8,800,000 M.1267
0.21 hari Bahan potong pipa T2/mekanik / cilinder 138,450 A.9
A.8.4.2.16 P-506 1.00 bh (K3) Pemotongan pipa PVC Ø 1200 mm 10,494,850 2.5 .
1.57 OH Pekerja 133,705 L.1
0.79 OH Tukang pipa 78,700 L.8
0.16 OH Mandor 29,045 L.10
1.00 bh Pipa PVC Ø 1200 mm 10,100,000 M.1268
0.24 hari Bahan potong pipa T2/mekanik / cilinder 153,400 A.9
A.8.4.2.17 P-507 1.00 bh (K3) Pemotongan pipa HDPE Ø 63 mm 62,381 0.0 .
0.00 OH Pekerja 170 L.1
0.00 OH Tukang pipa 100 L.8
0.00 OH Mandor 37 L.10
0.03 OH Operator Alat Pipa 4,474 L.22
1.00 bh Pipa HDPE Ø 63 mm 55,000 M.1223
0.00 hari Bahan potong pipa T2/mekanik / cilinder 2,600 A.9
A.8.4.2.18 P-508 1.00 bh (K3) Pemotongan pipa HDPE Ø 100 mm 137,587 0.1 .
0.01 OH Pekerja 510 L.1
0.00 OH Tukang pipa 300 L.8
0.00 OH Mandor 185 L.10
0.07 OH Operator Alat Pipa 9,342 L.22
1.00 bh Pipa HDPE Ø 100 mm 124,000 M.1224
0.01 hari Bahan potong pipa T2/mekanik / cilinder 3,250 A.9
A.8.4.2.19 P-509 1.00 bh (K3) Pemotongan pipa HDPE Ø 125 mm 255,981 0.1 .
0.01 OH Pekerja 765 L.1
0.01 OH Tukang pipa 500 L.8
0.00 OH Mandor 185 L.10
0.10 OH Operator Alat Pipa 12,631 L.22
1.00 bh Pipa HDPE Ø 125 mm 238,000 M.1225
0.01 hari Bahan potong pipa T2/mekanik / cilinder 3,900 A.9
A.8.4.2.20 P-510 1.00 bh (K3) Pemotongan pipa HDPE Ø 150 mm 320,301 0.1 .
0.02 OH Pekerja 1,360 L.1
0.01 OH Tukang pipa 800 L.8
0.00 OH Mandor 370 L.10
0.12 OH Operator Alat Pipa 15,921 L.22
1.00 bh Pipa HDPE Ø 150 mm 296,000 M.1226
0.01 hari Bahan potong pipa T2/mekanik / cilinder 5,850 A.9
A.8.4.2.21 P-511 1.00 bh (K3) Pemotongan pipa HDPE Ø 200 mm 647,230 0.2 .
0.04 OH Pekerja 3,740 L.1
0.02 OH Tukang pipa 2,200 L.8
0.00 OH Mandor 740 L.10
0.17 OH Operator Alat Pipa 22,500 L.22
1.00 bh Pipa HDPE Ø 200 mm 607,000 M.1227
0.02 hari Bahan potong pipa T2/mekanik / cilinder 11,050 A.9
A.8.4.2.22 P-512 1.00 bh (K3) Pemotongan pipaHDPE Ø 250 mm 1,000,319 0.3 .
0.07 OH Pekerja 5,695 L.1
0.03 OH Tukang pipa 3,300 L.8
0.01 OH Mandor 1,295 L.10
0.22 OH Operator Alat Pipa 29,079 L.22
1.00 bh Pipa HDPE Ø 250 mm 946,000 M.1228
0.02 hari Bahan potong pipa T2/mekanik / cilinder 14,950 A.9
A.8.4.2.23 P-513 1.00 bh (K3) Pemotongan pipa HDPE Ø 300 mm 1,588,973 0.4 .
0.09 OH Pekerja 7,650 L.1
0.05 OH Tukang pipa 4,500 L.8
0.01 OH Mandor 1,665 L.10
0.27 OH Operator Alat Pipa 35,658 L.22
1.00 bh Pipa HDPE Ø 300 mm 1,520,000 M.1229
0.03 hari Bahan potong pipa T2/mekanik / cilinder 19,500 A.9
A.8.4.2.24 P-514 1.00 bh (K3) Pemotongan pipa HDPE Ø 400 mm 2,529,740 0.7 .

Software RAB Exarch xPro 100/396


0.18 OH Pekerja 15,045 L.1
0.09 OH Tukang pipa 8,800 L.8
0.02 OH Mandor 3,330 L.10
0.37 OH Operator Alat Pipa 48,815 L.22
1.00 bh Pipa HDPE Ø 400 mm 2,418,000 M.1230
0.06 hari Bahan potong pipa T2/mekanik / cilinder 35,750 A.9
A.8.4.2.25 P-515 1.00 bh (K3) Pemotongan pipa HDPE Ø 450 mm 3,198,574 0.8 .
0.23 OH Pekerja 19,125 L.1
0.11 OH Tukang pipa 11,300 L.8
0.02 OH Mandor 4,255 L.10
0.42 OH Operator Alat Pipa 55,394 L.22
1.00 bh Pipa HDPE Ø 450 mm 3,063,000 M.1231
0.07 hari Bahan potong pipa T2/mekanik / cilinder 45,500 A.9
A.8.4.2.26 P-516 1.00 bh (K3) Pemotongan pipa HDPE Ø 500 mm 3,859,848 0.9 .
0.28 OH Pekerja 23,545 L.1
0.14 OH Tukang pipa 13,900 L.8
0.03 OH Mandor 5,180 L.10
0.47 OH Operator Alat Pipa 61,973 L.22
1.00 bh Pipa HDPE Ø 500 mm 3,700,000 M.1232
0.09 hari Bahan potong pipa T2/mekanik / cilinder 55,250 A.9
A.8.4.2.27 P-517 1.00 bh (K3) Pemotongan pipa HDPE Ø 600 mm 6,191,891 1.1 .
0.33 OH Pekerja 28,305 L.1
0.17 OH Tukang pipa 16,700 L.8
0.03 OH Mandor 6,105 L.10
0.57 OH Operator Alat Pipa 75,131 L.22
1.00 bh Pipa HDPE Ø 600 mm 6,000,000 M.1233
0.10 hari Bahan potong pipa T2/mekanik / cilinder 65,650 A.9
A.8.4.2.28 P-518 1.00 bh (K3) Pemotongan pipa HDPE Ø 800 mm 9,010,081 1.7 .
0.60 OH Pekerja 51,085 L.1
0.30 OH Tukang pipa 30,100 L.8
0.06 OH Mandor 11,100 L.10
0.77 OH Operator Alat Pipa 101,446 L.22
1.00 bh Pipa HDPE Ø 800 mm 8,700,000 M.1234
0.18 hari Bahan potong pipa T2/mekanik / cilinder 116,350 A.9
A.8.4.2.29 P-519 1.00 bh (K3) Pemotongan pipa HDPE Ø 900 mm 10,230,144 2.3 .
0.91 OH Pekerja 77,605 L.1
0.46 OH Tukang pipa 45,600 L.8
0.09 OH Mandor 16,835 L.10
0.87 OH Operator Alat Pipa 114,604 L.22
1.00 bh Pipa HDPE Ø 900 mm 9,800,000 M.1235
0.27 hari Bahan potong pipa T2/mekanik / cilinder 175,500 A.9
A.8.4.2.30 P-520 1.00 bh (K3) Pemotongan pipa HDPE Ø 1000 mm 11,016,107 2.8 .
1.13 OH Pekerja 95,625 L.1
0.56 OH Tukang pipa 56,200 L.8
0.11 OH Mandor 20,720 L.10
0.97 OH Operator Alat Pipa 127,762 L.22
1.00 bh Pipa HDPE Ø 1000 10,500,000 M.1236
0.33 hari Bahan potong pipa T2/mekanik / cilinder 215,800 A.9
A.8.4.2.31 P-521 1.00 bh (K3) Pemotongan pipa HDPE Ø 1100 mm 11,068,240 3.1 .
1.24 OH Pekerja 105,230 L.1
0.62 OH Tukang pipa 61,900 L.8
0.12 OH Mandor 22,940 L.10
1.07 OH Operator Alat Pipa 140,920 L.22
1.00 bh Pipa HDPE Ø 1100 10,500,000 M.1238
0.37 hari Bahan potong pipa T2/mekanik / cilinder 237,250 A.9
A.8.4.2.32 P-522 1.00 bh (K3) Pemotongan pipa HDPE Ø 1200 mm 13,212,612 3.8 .
1.62 OH Pekerja 137,615 L.1
0.81 OH Tukang pipa 80,900 L.8
0.16 OH Mandor 29,970 L.10
1.17 OH Operator Alat Pipa 154,077 L.22
1.00 bh Pipa HDPE Ø 1200 mm 12,500,000 M.1240
0.48 hari Bahan potong pipa T2/mekanik / cilinder 310,050 A.9

Software RAB Exarch xPro 101/396


A.8.4.2.33 P-523 1.00 bh (K3) Pemotongan pipa GIP Ø 63 mm 164,035 0.0 .
0.02 OH Pekerja 1,615 L.1
0.01 OH Tukang pipa 1,000 L.8
0.00 OH Mandor 370 L.10
1.00 bh Pipa GIP Ø 63 mm 150,000 M.1207
0.02 hari Bahan potong pipa T2/mekanik / cilinder 11,050 A.9
A.8.4.2.34 P-524 1.00 bh (K3) Pemotongan pipa GIP Ø 100 mm 238,990 0.1 .
0.06 OH Pekerja 4,930 L.1
0.03 OH Tukang pipa 2,900 L.8
0.01 OH Mandor 1,110 L.10
1.00 bh Pipa GIP Ø 100 mm 219,000 M.1208
0.02 hari Bahan potong pipa T2/mekanik / cilinder 11,050 A.9
A.8.4.2.35 P-525 1.00 bh (K3) Pemotongan pipa GIP Ø 125 mm 311,810 0.1 .
0.09 OH Pekerja 7,820 L.1
0.05 OH Tukang pipa 4,600 L.8
0.01 OH Mandor 1,665 L.10
1.00 bh Pipa GIP Ø 125 mm 275,625 M.1209
0.03 hari Bahan potong pipa T2/mekanik / cilinder 22,100 A.9
A.8.4.2.36 P-526 1.00 bh (K3) Pemotongan pipa GIP Ø 150 mm 372,990 0.2 .
0.13 OH Pekerja 11,135 L.1
0.07 OH Tukang pipa 6,600 L.8
0.01 OH Mandor 2,405 L.10
1.00 bh Pipa GIP Ø 150 mm 330,750 M.1210
0.03 hari Bahan potong pipa T2/mekanik / cilinder 22,100 A.9
A.8.4.2.37 P-527 1.00 bh (K3) Pemotongan pipa GIP Ø 200 mm 526,340 0.5 .
0.34 OH Pekerja 28,900 L.1
0.17 OH Tukang pipa 17,000 L.8
0.03 OH Mandor 6,290 L.10
1.00 bh Pipa GIP Ø 200 mm 441,000 M.1211
0.05 hari Bahan potong pipa T2/mekanik / cilinder 33,150 A.9
A.8.4.2.38 P-528 1.00 bh (K3) Pemotongan pipa GIP Ø 250 mm 657,170 0.8 .
0.48 OH Pekerja 40,375 L.1
0.24 OH Tukang pipa 23,700 L.8
0.05 OH Mandor 8,695 L.10
1.00 bh Pipa GIP Ø 250 mm 551,250 M.1212
0.05 hari Bahan potong pipa T2/mekanik / cilinder 33,150 A.9
A.8.4.2.39 P-529 1.00 bh (K3) Pemotongan pipa GIP Ø 300 mm 771,940 0.8 .
0.50 OH Pekerja 42,840 L.1
0.25 OH Tukang pipa 25,200 L.8
0.05 OH Mandor 9,250 L.10
1.00 bh Pipa GIP Ø 300 mm 661,500 M.1213
0.05 hari Bahan potong pipa T2/mekanik / cilinder 33,150 A.9
A.8.4.2.40 P-530 1.00 bh (K3) Pemotongan pipa GIP Ø 400 mm 1,039,520 1.2 .
0.74 OH Pekerja 62,730 L.1
0.37 OH Tukang pipa 36,900 L.8
0.07 OH Mandor 13,690 L.10
1.00 bh Pipa GIP Ø 400 mm 882,000 M.1214
0.07 hari Bahan potong pipa T2/mekanik / cilinder 44,200 A.9
A.8.4.2.41 P-531 1.00 bh (K3) Pemotongan pipa GIP Ø 450 mm 1,166,655 1.4 .
0.85 OH Pekerja 72,080 L.1
0.42 OH Tukang pipa 42,400 L.8
0.09 OH Mandor 15,725 L.10
1.00 bh Pipa GIP Ø 450 mm 992,250 M.1215
0.07 hari Bahan potong pipa T2/mekanik / cilinder 44,200 A.9
A.8.4.2.42 P-532 1.00 bh (K3) Pemotongan pipa GIP Ø 500 mm 1,291,175 1.5 .
0.94 OH Pekerja 79,985 L.1
0.47 OH Tukang pipa 47,100 L.8
0.09 OH Mandor 17,390 L.10
1.00 bh Pipa GIP Ø 500 mm 1,102,500 M.1216
0.07 hari Bahan potong pipa T2/mekanik / cilinder 44,200 A.9
A.8.4.2.43 P-533 1.00 bh (K3) Pemotongan pipa GIP Ø 600 mm 1,510,800 1.4 .
0.86 OH Pekerja 73,440 L.1

Software RAB Exarch xPro 102/396


0.43 OH Tukang pipa 43,200 L.8
0.09 OH Mandor 15,910 L.10
1.00 bh Pipa GIP Ø 600 mm 1,323,000 M.1217
0.09 hari Bahan potong pipa T2/mekanik / cilinder 55,250 A.9
A.8.4.2.44 P-534 1.00 bh (K3) Pemotongan pipa GIP Ø 800 mm 2,059,790 2.5 .
1.57 OH Pekerja 133,195 L.1
0.78 OH Tukang pipa 78,300 L.8
0.16 OH Mandor 29,045 L.10
1.00 bh Pipa GIP Ø 800 mm 1,764,000 M.1218
0.09 hari Bahan potong pipa T2/mekanik / cilinder 55,250 A.9
A.8.4.2.45 P-535 1.00 bh (K3) Pemotongan pipa GIP Ø 900 mm 2,311,445 2.8 .
1.77 OH Pekerja 150,450 L.1
0.89 OH Tukang pipa 88,500 L.8
0.18 OH Mandor 32,745 L.10
1.00 bh Pipa GIP Ø 900 mm 1,984,500 M.1219
0.09 hari Bahan potong pipa T2/mekanik / cilinder 55,250 A.9
A.8.4.2.46 P-536 1.00 bh (K3) Pemotongan pipa GIP Ø 1000 mm 2,574,235 3.2 .
1.97 OH Pekerja 167,790 L.1
0.99 OH Tukang pipa 98,700 L.8
0.20 OH Mandor 36,445 L.10
1.00 bh Pipa GIP Ø 1000 mm 2,205,000 M.1220
0.10 hari Bahan potong pipa T2/mekanik / cilinder 66,300 A.9
A.8.4.2.47 P-537 1.00 bh (K3) Pemotongan pipa GIP Ø 1100 mm 2,826,160 3.5 .
2.18 OH Pekerja 185,130 L.1
1.09 OH Tukang pipa 108,900 L.8
0.22 OH Mandor 40,330 L.10
1.00 bh Pipa GIP Ø 1100 mm 2,425,500 M.1221
0.10 hari Bahan potong pipa T2/mekanik / cilinder 66,300 A.9
A.8.4.2.48 P-538 1.00 bh (K3) Pemotongan pipa GIP Ø 1200 mm 3,077,900 3.8 .
2.38 OH Pekerja 202,470 L.1
1.19 OH Tukang pipa 119,100 L.8
0.24 OH Mandor 44,030 L.10
1.00 bh Pipa GIP Ø 1200 mm 2,646,000 M.1222
0.10 hari Bahan potong pipa T2/mekanik / cilinder 66,300 A.9
A.8.4.2.49 P-539 1.00 bh (K3) Pemotongan pipa DCI Ø 100 mm 147,148 0.1 .
0.07 OH Pekerja 6,035 L.1
0.01 OH Tukang pipa 1,400 L.8
0.01 OH Mandor 1,295 L.10
1.00 bh Pipa DCI Ø 100 mm 137,000 M.1192
0.00 hari Sewa Tripot/Tackel & handle crane 2 T 1,418 A.29
A.8.4.2.50 P-540 1.00 bh (K3) Pemotongan pipa DCI Ø 125 mm 218,480 0.1 .
0.11 OH Pekerja 9,520 L.1
0.02 OH Tukang pipa 2,200 L.8
0.01 OH Mandor 2,035 L.10
1.00 bh Pipa DCI Ø 125 mm 200,000 M.1193
0.01 hari Sewa Tripot/Tackel & handle crane 2 T 4,725 A.29
A.8.4.2.51 P-541 1.00 bh (K3) Pemotongan pipa DCI Ø 150 mm 337,180 0.2 .
0.16 OH Pekerja 13,515 L.1
0.03 OH Tukang pipa 3,200 L.8
0.02 OH Mandor 2,960 L.10
1.00 bh Pipa DCI Ø 150 mm 309,000 M.1194
0.02 hari Sewa Tripot/Tackel & handle crane 2 T 8,505 A.29
A.8.4.2.52 P-542 1.00 bh (K3) Pemotongan pipa DCI Ø 200 mm 620,770 0.5 .
0.37 OH Pekerja 31,110 L.1
0.07 OH Tukang pipa 7,300 L.8
0.04 OH Mandor 6,845 L.10
1.00 bh Pipa DCI Ø 200 mm 550,000 M.1195
0.05 hari Sewa Tripot/Tackel & handle crane 2 T 25,515 A.29
A.8.4.2.53 P-543 1.00 bh (K3) Pemotongan pipa DCI Ø 250 mm 867,333 0.6 .
0.48 OH Pekerja 40,460 L.1
0.10 OH Tukang pipa 9,500 L.8
0.05 OH Mandor 8,880 L.10

Software RAB Exarch xPro 103/396


1.00 bh Pipa DCI Ø 250 mm 774,000 M.1196
0.07 hari Sewa Tripot/Tackel & handle crane 2 T 34,493 A.29
A.8.4.2.54 P-544 1.00 bh (K3) Pemotongan pipa DCI Ø 300 mm 1,150,483 0.7 .
0.51 OH Pekerja 43,520 L.1
0.10 OH Tukang pipa 10,200 L.8
0.05 OH Mandor 9,435 L.10
1.00 bh Pipa DCI Ø 300 mm 1,050,000 M.1197
0.08 hari Sewa Tripot/Tackel & handle crane 2 T 37,328 A.29
A.8.4.2.55 P-545 1.00 bh (K3) Pemotongan pipa DCI Ø 400 mm 2,618,875 1.2 .
0.94 OH Pekerja 79,985 L.1
0.19 OH Tukang pipa 18,800 L.8
0.09 OH Mandor 17,390 L.10
1.00 bh Pipa DCI Ø 400 mm 2,400,000 M.1198
0.16 hari Bahan potong pipa T2/mekanik / cilinder 102,700 A.9
A.8.4.2.56 P-546 1.00 bh (K3) Pemotongan pipa DCI Ø 450 mm 3,054,835 1.5 .
1.14 OH Pekerja 96,645 L.1
0.23 OH Tukang pipa 22,700 L.8
0.11 OH Mandor 21,090 L.10
1.00 bh Pipa DCI Ø 450 mm 2,800,000 M.1199
0.18 hari Bahan potong pipa T2/mekanik / cilinder 114,400 A.9
A.8.4.2.57 P-547 1.00 bh (K3) Pemotongan pipa DCI Ø 500 mm 3,486,755 1.7 .
1.31 OH Pekerja 111,520 L.1
0.26 OH Tukang pipa 26,200 L.8
0.13 OH Mandor 24,235 L.10
1.00 bh Pipa DCI Ø 500 mm 3,200,000 M.1200
0.19 hari Bahan potong pipa T2/mekanik / cilinder 124,800 A.9
A.8.4.2.58 P-548 1.00 bh (K3) Pemotongan pipa DCI Ø 600 mm 3,886,500 1.7 .
1.31 OH Pekerja 111,265 L.1
0.26 OH Tukang pipa 26,200 L.8
0.13 OH Mandor 24,235 L.10
1.00 bh Pipa DCI Ø 600 mm 3,600,000 M.1201
0.19 hari Bahan potong pipa T2/mekanik / cilinder 124,800 A.9
A.8.4.2.59 P-549 1.00 bh (K3) Pemotongan pipa DCI Ø 800 mm 5,322,430 3.4 .
2.60 OH Pekerja 220,830 L.1
0.52 OH Tukang pipa 52,000 L.8
0.26 OH Mandor 48,100 L.10
1.00 bh Pipa DCI Ø 800 mm 4,800,000 M.1202
0.31 hari Bahan potong pipa T2/mekanik / cilinder 201,500 A.9
A.8.4.2.60 P-550 1.00 bh (K3) Pemotongan pipa DCI Ø 900 mm 5,763,845 4.4 .
3.37 OH Pekerja 286,450 L.1
0.67 OH Tukang pipa 67,400 L.8
0.34 OH Mandor 62,345 L.10
1.00 bh Pipa DCI Ø 900 mm 5,100,000 M.1203
0.38 hari Bahan potong pipa T2/mekanik / cilinder 247,650 A.9
A.8.4.2.61 P-551 1.00 bh (K3) Pemotongan pipa DCI Ø 1000 mm 6,783,205 5.2 .
4.02 OH Pekerja 341,785 L.1
0.80 OH Tukang pipa 80,400 L.8
0.40 OH Mandor 74,370 L.10
1.00 bh Pipa DCI Ø 1000 mm 6,000,000 M.1204
0.44 hari Bahan potong pipa T2/mekanik / cilinder 286,650 A.9
A.8.4.2.62 P-552 1.00 bh (K3) Pemotongan pipa DCI Ø 1100 mm 7,413,140 6.2 .
4.73 OH Pekerja 402,135 L.1
0.95 OH Tukang pipa 94,600 L.8
0.47 OH Mandor 87,505 L.10
1.00 bh Pipa DCI Ø 1100 mm 6,500,000 M.1205
0.51 hari Bahan potong pipa T2/mekanik / cilinder 328,900 A.9
A.8.4.2.63 P-553 1.00 bh (K3) Pemotongan pipa DCI Ø 1200 mm 8,353,820 7.2 .
5.50 OH Pekerja 467,670 L.1
1.10 OH Tukang pipa 110,000 L.8
0.55 OH Mandor 101,750 L.10
1.00 bh Pipa DCI Ø 1200 mm 7,300,000 M.1206
0.58 hari Bahan potong pipa T2/mekanik / cilinder 374,400 A.9

Software RAB Exarch xPro 104/396


A.8.4.2.64 P-554 1.00 bh (K3) Pemotongan pipa baja Ø 63 mm 235,918 0.0 .
0.03 OH Pekerja 2,380 L.1
0.01 OH Tukang pipa 600 L.8
0.00 OH Mandor 555 L.10
1.00 bh Pipa Baja Ø 63 mm 208,333 M.1176
0.04 hari Bahan potong pipa T2/mekanik / cilinder 24,050 A.9
A.8.4.2.65 P-555 1.00 bh (K3) Pemotongan pipa baja Ø 100 mm 411,405 0.1 .
0.09 OH Pekerja 7,225 L.1
0.02 OH Tukang pipa 1,700 L.8
0.01 OH Mandor 1,480 L.10
1.00 bh Pipa Baja Ø 100 mm 375,000 M.1177
0.04 hari Bahan potong pipa T2/mekanik / cilinder 26,000 A.9
A.8.4.2.66 P-556 1.00 bh (K3) Pemotongan pipa baja Ø 125 mm 252,043 0.2 .
0.13 OH Pekerja 11,305 L.1
0.03 OH Tukang pipa 2,700 L.8
0.01 OH Mandor 2,405 L.10
1.00 bh Pipa Baja Ø 125 mm 208,333 M.1178
0.04 hari Bahan potong pipa T2/mekanik / cilinder 27,300 A.9
A.8.4.2.67 P-557 1.00 bh (K3) Pemotongan pipa baja Ø 150 mm 175,920 0.2 .
0.18 OH Pekerja 15,640 L.1
0.04 OH Tukang pipa 3,700 L.8
0.02 OH Mandor 3,330 L.10
1.00 bh Pipa Baja Ø 150 mm 124,000 M.1179
0.05 hari Bahan potong pipa T2/mekanik / cilinder 29,250 A.9
A.8.4.2.68 P-558 1.00 bh (K3) Pemotongan pipa baja Ø 200 mm 311,840 0.6 .
0.48 OH Pekerja 40,460 L.1
0.10 OH Tukang pipa 9,500 L.8
0.05 OH Mandor 8,880 L.10
1.00 bh Pipa Baja Ø 200 mm 214,000 M.1180
0.06 hari Bahan potong pipa T2/mekanik / cilinder 39,000 A.9
A.8.4.2.69 P-559 1.00 bh (K3) Pemotongan pipa baja Ø 250 mm 388,065 0.9 .
0.66 OH Pekerja 56,355 L.1
0.13 OH Tukang pipa 13,300 L.8
0.07 OH Mandor 12,210 L.10
1.00 bh Pipa Baja Ø 250 mm 262,000 M.1181
0.07 hari Bahan potong pipa T2/mekanik / cilinder 44,200 A.9
A.8.4.2.70 P-560 1.00 bh (K3) Pemotongan pipa baja Ø 300 mm 453,715 1.0 .
0.75 OH Pekerja 63,325 L.1
0.15 OH Tukang pipa 14,900 L.8
0.07 OH Mandor 13,690 L.10
1.00 bh Pipa Baja Ø 300 mm 315,000 M.1182
0.07 hari Bahan potong pipa T2/mekanik / cilinder 46,800 A.9
A.8.4.2.71 P-561 1.00 bh (K3) Pemotongan pipa baja Ø 400 mm 666,090 1.9 .
1.44 OH Pekerja 122,400 L.1
0.29 OH Tukang pipa 28,800 L.8
0.14 OH Mandor 26,640 L.10
1.00 bh Pipa Baja Ø 400 mm 420,000 M.1183
0.11 hari Bahan potong pipa T2/mekanik / cilinder 68,250 A.9
A.8.4.2.72 P-562 1.00 bh (K3) Pemotongan pipa baja Ø 450 mm 714,365 1.8 .
1.40 OH Pekerja 118,915 L.1
0.28 OH Tukang pipa 28,000 L.8
0.14 OH Mandor 25,900 L.10
1.00 bh Pipa Baja Ø 450 mm 472,000 M.1184
0.11 hari Bahan potong pipa T2/mekanik / cilinder 69,550 A.9
A.8.4.2.73 P-563 1.00 bh (K3) Pemotongan pipa baja Ø 500 mm 787,040 2.0 .
1.56 OH Pekerja 132,430 L.1
0.31 OH Tukang pipa 31,200 L.8
0.16 OH Mandor 28,860 L.10
1.00 bh Pipa Baja Ø 500 mm 525,000 M.1185
0.11 hari Bahan potong pipa T2/mekanik / cilinder 69,550 A.9
A.8.4.2.74 P-564 1.00 bh (K3) Pemotongan pipa baja Ø 600 mm 885,935 1.9 .
1.44 OH Pekerja 122,145 L.1

Software RAB Exarch xPro 105/396


0.29 OH Tukang pipa 28,700 L.8
0.14 OH Mandor 26,640 L.10
1.00 bh Pipa Baja Ø 600 mm 635,000 M.1186
0.11 hari Bahan potong pipa T2/mekanik / cilinder 73,450 A.9
A.8.4.2.75 P-565 1.00 bh (K3) Pemotongan pipa baja Ø 800 mm 1,271,910 3.4 .
2.62 OH Pekerja 223,040 L.1
0.53 OH Tukang pipa 52,500 L.8
0.26 OH Mandor 48,470 L.10
1.00 bh Pipa Baja Ø 800 mm 840,000 M.1187
0.17 hari Bahan potong pipa T2/mekanik / cilinder 107,900 A.9
A.8.4.2.76 P-566 1.00 bh (K3) Pemotongan pipa baja Ø 900 mm 1,430,830 3.9 .
2.97 OH Pekerja 252,535 L.1
0.59 OH Tukang pipa 59,400 L.8
0.30 OH Mandor 54,945 L.10
1.00 bh Pipa Baja Ø 900 mm 945,000 M.1188
0.18 hari Bahan potong pipa T2/mekanik / cilinder 118,950 A.9
A.8.4.2.77 P-567 1.00 bh (K3) Pemotongan pipa baja Ø 1000 mm 1,740,585 4.3 .
3.32 OH Pekerja 282,115 L.1
0.66 OH Tukang pipa 66,400 L.8
0.33 OH Mandor 61,420 L.10
1.00 bh Pipa Baja Ø 1000 mm 1,200,000 M.1189
0.20 hari Bahan potong pipa T2/mekanik / cilinder 130,650 A.9
A.8.4.2.78 P-568 1.00 bh (K3) Pemotongan pipa baja Ø 1100 mm 1,844,590 4.8 .
3.67 OH Pekerja 311,695 L.1
0.73 OH Tukang pipa 73,300 L.8
0.37 OH Mandor 67,895 L.10
1.00 bh Pipa Baja Ø 1100 mm 1,250,000 M.1190
0.22 hari Bahan potong pipa T2/mekanik / cilinder 141,700 A.9
A.8.4.2.79 P-569 1.00 bh (K3) Pemotongan pipa baja Ø 1200 mm 1,899,345 5.2 .
4.02 OH Pekerja 341,275 L.1
0.80 OH Tukang pipa 80,300 L.8
0.40 OH Mandor 74,370 L.10
1.00 bh Pipa Baja Ø 1100 mm 1,250,000 M.1190
0.24 hari Bahan potong pipa T2/mekanik / cilinder 153,400 A.9
A.8.4.3.1 P-570 1.00 bh (K3) Pemasangan Valve Ø 150 mm 5,866,670 2.3 .
1.43 OH Pekerja 121,465 L.1
0.72 OH Tukang pipa 71,500 L.8
0.14 OH Mandor 26,455 L.10
1.00 bh Valve Ø 150 mm 5,600,000 M.1283
0.10 hari Sewa Tripot/Tackel & handle crane 2 T 47,250 A.29
A.8.4.3.2 P-571 1.00 bh (K3) Pemasangan Valve Ø 200 mm 7,104,775 2.7 .
1.71 OH Pekerja 145,690 L.1
0.86 OH Tukang pipa 85,700 L.8
0.17 OH Mandor 31,635 L.10
1.00 bh Valve Ø 200 mm 6,700,000 M.1284
0.30 hari Sewa Tripot/Tackel & handle crane 2 T 141,750 A.29
A.8.4.3.3 P-572 1.00 bh (K3) Pemasangan Valve Ø 250 mm 9,952,025 2.7 .
1.71 OH Pekerja 145,690 L.1
0.86 OH Tukang pipa 85,700 L.8
0.17 OH Mandor 31,635 L.10
1.00 bh Valve Ø 250 mm 9,500,000 M.1285
0.40 hari Sewa Tripot/Tackel & handle crane 2 T 189,000 A.29
A.8.4.3.4 P-573 1.00 bh (K3) Pemasangan Valve Ø 300 mm 3,543,250 3.2 .
2.00 OH Pekerja 170,000 L.1
1.00 OH Tukang pipa 100,000 L.8
0.20 OH Mandor 37,000 L.10
1.00 bh Valve Ø 300 mm 3,000,000 M.1286
0.50 hari Sewa Tripot/Tackel & handle crane 2 T 236,250 A.29
A.8.4.3.5 P-574 1.00 bh (K3) Pemasangan Valve Ø 400 mm 4,998,920 5.5 .
3.43 OH Pekerja 291,465 L.1
1.72 OH Tukang pipa 171,500 L.8
0.34 OH Mandor 63,455 L.10

Software RAB Exarch xPro 106/396


1.00 bh Valve Ø 400 mm 4,000,000 M.1287
1.00 hari Sewa Tripot/Tackel & handle crane 2 T 472,500 A.29
A.8.4.3.6 P-575 1.00 bh (K3) Pemasangan Valve Ø 450 mm 5,498,920 5.5 .
3.43 OH Pekerja 291,465 L.1
1.72 OH Tukang pipa 171,500 L.8
0.34 OH Mandor 63,455 L.10
1.00 bh Valve Ø 450 mm 4,500,000 M.1288
1.00 hari Sewa Tripot/Tackel & handle crane 2 T 472,500 A.29
A.8.4.3.7 P-576 1.00 bh (K3) Pemasangan Valve Ø 500 mm 6,086,500 6.4 .
4.00 OH Pekerja 340,000 L.1
2.00 OH Tukang pipa 200,000 L.8
0.40 OH Mandor 74,000 L.10
1.00 bh Valve Ø 500 mm 5,000,000 M.1289
1.00 hari Sewa Tripot/Tackel & handle crane 2 T 472,500 A.29
A.8.4.3.8 P-577 1.00 bh (K3) Pemasangan Valve Ø 600 mm 6,816,655 2.3 .
1.42 OH Pekerja 120,785 L.1
0.71 OH Tukang pipa 71,100 L.8
0.14 OH Mandor 26,270 L.10
1.00 bh Valve Ø 600 mm 6,000,000 M.1290
0.60 hari Sewa Tripot/Tackel & handle crane 2 T 283,500 A.29
0.30 hari Mobile crane =< 3 ton 315,000 A.10
A.8.4.3.9 P-578 1.00 bh (K3) Pemasangan Valve Ø 700 mm 7,980,670 2.3 .
1.43 OH Pekerja 121,465 L.1
0.72 OH Tukang pipa 71,500 L.8
0.14 OH Mandor 26,455 L.10
1.00 bh Valve Ø 700 mm 7,000,000 M.1291
0.50 hari Sewa Tripot/Tackel & handle crane 2 T 236,250 A.29
0.50 hari Mobile crane =< 3 ton 525,000 A.10
A.8.4.3.10 P-579 1.00 bh (K3) Pemasangan Valve Ø 800 mm 9,035,475 2.9 .
1.79 OH Pekerja 151,810 L.1
0.89 OH Tukang pipa 89,300 L.8
0.18 OH Mandor 33,115 L.10
1.00 bh Valve Ø 800 mm 8,000,000 M.1292
0.50 hari Sewa Tripot/Tackel & handle crane 2 T 236,250 A.29
0.50 hari Mobile crane =< 3 ton 525,000 A.10
A.8.4.3.11 P-580 1.00 bh (K3) Pemasangan Valve Ø 900 mm 10,404,900 2.7 .
1.71 OH Pekerja 145,690 L.1
0.86 OH Tukang pipa 85,700 L.8
0.17 OH Mandor 31,635 L.10
1.00 bh Valve Ø 900 mm 9,000,000 M.1293
0.75 hari Sewa Tripot/Tackel & handle crane 2 T 354,375 A.29
0.75 hari Mobile crane =< 3 ton 787,500 A.10
A.8.4.3.12 P-581 1.00 bh (K3) Pemasangan Valve Ø 1000 mm 12,917,180 4.1 .
2.57 OH Pekerja 218,535 L.1
1.29 OH Tukang pipa 128,600 L.8
0.26 OH Mandor 47,545 L.10
1.00 bh Valve Ø 1000 mm 11,000,000 M.1294
1.00 hari Sewa Tripot/Tackel & handle crane 2 T 472,500 A.29
1.00 hari Mobile crane =< 3 ton 1,050,000 A.10
A.8.4.3.13 P-582 1.00 bh (K3) Pemasangan Valve Ø 1100 mm 13,483,000 4.8 .
3.00 OH Pekerja 255,000 L.1
1.50 OH Tukang pipa 150,000 L.8
0.30 OH Mandor 55,500 L.10
1.00 bh Valve Ø 1100 mm 11,500,000 M.1295
1.00 hari Sewa Tripot/Tackel & handle crane 2 T 472,500 A.29
1.00 hari Mobile crane =< 3 ton 1,050,000 A.10
A.8.4.3.14 P-583 1.00 bh (K3) Pemasangan Valve Ø 1200 mm 14,983,000 4.8 .
3.00 OH Pekerja 255,000 L.1
1.50 OH Tukang pipa 150,000 L.8
0.30 OH Mandor 55,500 L.10
1.00 bh Valve Ø 1200 mm 13,000,000 M.1296
1.00 hari Sewa Tripot/Tackel & handle crane 2 T 472,500 A.29

Software RAB Exarch xPro 107/396


1.00 hari Mobile crane =< 3 ton 1,050,000 A.10
A.8.4.3.15 P-584 1.00 bh (K3) Pemasangan Tee Ø 150 mm 179,575 0.2 .
0.11 OH Pekerja 9,010 L.1
0.05 OH Tukang pipa 5,300 L.8
0.01 OH Mandor 2,035 L.10
1.00 bh Tee Ø 150 mm 150,000 M.1269
0.03 hari Sewa Tripot/Tackel & handle crane 2 T 13,230 A.29
A.8.4.3.16 P-585 1.00 bh (K3) Pemasangan Tee Ø 200 mm 246,933 0.3 .
0.22 OH Pekerja 18,360 L.1
0.11 OH Tukang pipa 10,800 L.8
0.02 OH Mandor 4,070 L.10
1.00 bh Tee Ø 200 mm 200,000 M.1270
0.03 hari Sewa Tripot/Tackel & handle crane 2 T 13,703 A.29
A.8.4.3.17 P-586 1.00 bh (K3) Pemasangan 1 buah Tee Ø 250 mm 318,543 0.5 .
0.33 OH Pekerja 27,710 L.1
0.16 OH Tukang pipa 16,300 L.8
0.03 OH Mandor 6,105 L.10
1.00 bh Tee Ø 250 mm 250,000 M.1271
0.04 hari Sewa Tripot/Tackel & handle crane 2 T 18,428 A.29
A.8.4.3.18 P-587 1.00 bh (K3) Pemasangan Tee Ø 300 mm 603,250 0.7 .
0.44 OH Pekerja 37,060 L.1
0.22 OH Tukang pipa 21,800 L.8
0.04 OH Mandor 8,140 L.10
1.00 bh Tee Ø 300 mm 300,000 M.1272
0.50 hari Sewa Tripot/Tackel & handle crane 2 T 236,250 A.29
A.8.4.3.19 P-588 1.00 bh (K3) Pemasangan Tee Ø 400 mm 737,020 1.1 .
0.66 OH Pekerja 55,760 L.1
0.33 OH Tukang pipa 32,800 L.8
0.07 OH Mandor 12,210 L.10
1.00 bh Tee Ø 400 mm 400,000 M.1273
0.50 hari Sewa Tripot/Tackel & handle crane 2 T 236,250 A.29
A.8.4.3.20 P-589 1.00 bh (K3) Pemasangan Tee Ø 450 mm 803,905 1.2 .
0.77 OH Pekerja 65,110 L.1
0.38 OH Tukang pipa 38,300 L.8
0.08 OH Mandor 14,245 L.10
1.00 bh Tee Ø 450 mm 450,000 M.1274
0.50 hari Sewa Tripot/Tackel & handle crane 2 T 236,250 A.29
A.8.4.3.21 P-590 1.00 bh (K3) Pemasangan Tee Ø 500 mm 918,040 1.4 .
0.88 OH Pekerja 74,460 L.1
0.44 OH Tukang pipa 43,800 L.8
0.09 OH Mandor 16,280 L.10
1.00 bh Tee Ø 500 mm 500,000 M.1275
0.60 hari Sewa Tripot/Tackel & handle crane 2 T 283,500 A.29
A.8.4.3.22 P-591 1.00 bh (K3) Pemasangan Tee Ø 600 mm 960,303 1.8 .
1.10 OH Pekerja 93,160 L.1
0.55 OH Tukang pipa 54,800 L.8
0.11 OH Mandor 20,350 L.10
1.00 bh Tee Ø 600 mm 600,000 M.1276
0.19 hari Sewa Tripot/Tackel & handle crane 2 T 91,193 A.29
0.10 hari Mobile crane =< 3 ton 100,800 A.10
A.8.4.3.23 P-592 1.00 bh (K3) Pemasangan Tee Ø 700 mm 1,127,043 2.1 .
1.32 OH Pekerja 111,860 L.1
0.66 OH Tukang pipa 65,800 L.8
0.13 OH Mandor 24,420 L.10
1.00 bh Tee Ø 700 mm 700,000 M.1277
0.23 hari Sewa Tripot/Tackel & handle crane 2 T 106,313 A.29
0.11 hari Mobile crane =< 3 ton 118,650 A.10
A.8.4.3.24 P-593 1.00 bh (K3) Pemasangan Tee Ø 800 mm 1,292,733 2.5 .
1.54 OH Pekerja 130,560 L.1
0.77 OH Tukang pipa 76,800 L.8
0.15 OH Mandor 28,490 L.10
1.00 bh Tee Ø 800 mm 800,000 M.1278

Software RAB Exarch xPro 108/396


0.26 hari Sewa Tripot/Tackel & handle crane 2 T 121,433 A.29
0.13 hari Mobile crane =< 3 ton 135,450 A.10
A.8.4.3.25 P-594 1.00 bh (K3) Pemasangan Tee Ø 900 mm 1,490,343 2.8 .
1.76 OH Pekerja 149,260 L.1
0.88 OH Tukang pipa 87,800 L.8
0.18 OH Mandor 32,560 L.10
1.00 bh Tee Ø 900 mm 900,000 M.1279
0.32 hari Sewa Tripot/Tackel & handle crane 2 T 151,673 A.29
0.16 hari Mobile crane =< 3 ton 169,050 A.10
A.8.4.3.26 P-595 1.00 bh (K3) Pemasangan Tee Ø 1000 mm 1,718,475 3.2 .
1.98 OH Pekerja 167,960 L.1
0.99 OH Tukang pipa 98,800 L.8
0.20 OH Mandor 36,630 L.10
1.00 bh Tee Ø 1000 mm 1,050,000 M.1280
0.37 hari Sewa Tripot/Tackel & handle crane 2 T 172,935 A.29
0.18 hari Mobile crane =< 3 ton 192,150 A.10
A.8.4.3.27 P-596 1.00 bh (K3) Pemasangan Tee Ø 1100 mm 1,872,195 3.5 .
2.20 OH Pekerja 186,660 L.1
1.10 OH Tukang pipa 109,800 L.8
0.22 OH Mandor 40,700 L.10
1.00 bh Tee Ø 1100 mm 1,150,000 M.1281
0.39 hari Sewa Tripot/Tackel & handle crane 2 T 182,385 A.29
0.19 hari Mobile crane =< 3 ton 202,650 A.10
A.8.4.3.28 P-597 1.00 bh (K3) Pemasangan Tee Ø 1200 mm 2,019,805 3.9 .
2.42 OH Pekerja 205,360 L.1
1.21 OH Tukang pipa 120,800 L.8
0.24 OH Mandor 44,770 L.10
1.00 bh Tee Ø 1200 mm 1,200,000 M.1282
0.45 hari Sewa Tripot/Tackel & handle crane 2 T 212,625 A.29
0.23 hari Mobile crane =< 3 ton 236,250 A.10
A.8.4.4.1 P-598 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 80 m 1,387,159 2.3 .
1.47 OH Pekerja 124,610 L.1
0.73 OH Tukang pipa 73,300 L.8
0.15 OH Mandor 27,195 L.10
1.00 bh Pipa Ø 80 mm 58,000 M.1241
0.61 hari Bahan potong pipa T2/mekanik / cilinder 393,900 A.9
0.08 hari Sewa Genset 1500 watt 23,625 A.26
0.97 hari Sewa Pompa Submersible 3m3/h 277,816 A.28
0.87 hari Sewa Tripot/Tackel & handle crane 2 T 408,713 A.29
A.8.4.4.2 P-599 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 100 1,554,154 2.6 .
1.65 OH Pekerja 139,910 L.1
0.82 OH Tukang pipa 82,300 L.8
0.17 OH Mandor 30,525 L.10
1.00 bh Pipa Ø 100 mm 89,000 M.1242
0.65 hari Bahan potong pipa T2/mekanik / cilinder 422,500 A.9
0.16 hari Sewa Genset 1500 watt 50,085 A.26
1.08 hari Sewa Pompa Submersible 3m3/h 309,386 A.28
0.91 hari Sewa Tripot/Tackel & handle crane 2 T 430,448 A.29
A.8.4.4.3 P-600 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 150 1,900,141 3.4 .
2.10 OH Pekerja 178,160 L.1
1.05 OH Tukang pipa 104,800 L.8
0.21 OH Mandor 38,850 L.10
1.00 bh Pipa Ø 150 mm 95,000 M.1243
0.76 hari Bahan potong pipa T2/mekanik / cilinder 494,000 A.9
0.37 hari Sewa Genset 1500 watt 116,235 A.26
1.35 hari Sewa Pompa Submersible 3m3/h 388,311 A.28
1.03 hari Sewa Tripot/Tackel & handle crane 2 T 484,785 A.29
A.8.4.4.4 P-601 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 200 2,323,129 4.1 .
2.55 OH Pekerja 216,410 L.1
1.27 OH Tukang pipa 127,300 L.8
0.26 OH Mandor 47,175 L.10
1.00 bh Pipa Ø 200 mm 178,000 M.1244

Software RAB Exarch xPro 109/396


0.87 hari Bahan potong pipa T2/mekanik / cilinder 565,500 A.9
0.58 hari Sewa Genset 1500 watt 182,385 A.26
1.63 hari Sewa Pompa Submersible 3m3/h 467,236 A.28
1.14 hari Sewa Tripot/Tackel & handle crane 2 T 539,123 A.29
A.8.4.4.5 P-602 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 250 2,705,116 4.8 .
3.00 OH Pekerja 254,660 L.1
1.50 OH Tukang pipa 149,800 L.8
0.30 OH Mandor 55,500 L.10
1.00 bh Pipa Ø 250 mm 220,000 M.1245
0.98 hari Bahan potong pipa T2/mekanik / cilinder 637,000 A.9
0.79 hari Sewa Genset 1500 watt 248,535 A.26
1.90 hari Sewa Pompa Submersible 3m3/h 546,161 A.28
1.26 hari Sewa Tripot/Tackel & handle crane 2 T 593,460 A.29
A.8.4.4.6 P-603 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 300 3,093,104 5.5 .
3.45 OH Pekerja 292,910 L.1
1.72 OH Tukang pipa 172,300 L.8
0.35 OH Mandor 63,825 L.10
1.00 bh Pipa Ø 300 mm 268,000 M.1246
1.09 hari Bahan potong pipa T2/mekanik / cilinder 708,500 A.9
1.00 hari Sewa Genset 1500 watt 314,685 A.26
2.18 hari Sewa Pompa Submersible 3m3/h 625,086 A.28
1.37 hari Sewa Tripot/Tackel & handle crane 2 T 647,798 A.29
A.8.4.4.7 P-604 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 400 3,862,079 7.0 .
4.35 OH Pekerja 369,410 L.1
2.17 OH Tukang pipa 217,300 L.8
0.44 OH Mandor 80,475 L.10
1.00 bh Pipa Ø 400 mm 357,000 M.1247
1.31 hari Bahan potong pipa T2/mekanik / cilinder 851,500 A.9
1.42 hari Sewa Genset 1500 watt 446,985 A.26
2.73 hari Sewa Pompa Submersible 3m3/h 782,936 A.28
1.60 hari Sewa Tripot/Tackel & handle crane 2 T 756,473 A.29
A.8.4.4.8 P-605 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 450 4,286,066 7.7 .
4.80 OH Pekerja 407,660 L.1
2.40 OH Tukang pipa 239,800 L.8
0.48 OH Mandor 88,800 L.10
1.00 bh Pipa Ø 450 mm 441,000 M.1248
1.42 hari Bahan potong pipa T2/mekanik / cilinder 923,000 A.9
1.63 hari Sewa Genset 1500 watt 513,135 A.26
3.00 hari Sewa Pompa Submersible 3m3/h 861,861 A.28
1.72 hari Sewa Tripot/Tackel & handle crane 2 T 810,810 A.29
A.8.4.4.9 P-606 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 500 4,657,054 8.4 .
5.25 OH Pekerja 445,910 L.1
2.62 OH Tukang pipa 262,300 L.8
0.53 OH Mandor 97,125 L.10
1.00 bh Pipa Ø 500 mm 472,000 M.1249
1.53 hari Bahan potong pipa T2/mekanik / cilinder 994,500 A.9
1.84 hari Sewa Genset 1500 watt 579,285 A.26
3.28 hari Sewa Pompa Submersible 3m3/h 940,786 A.28
1.83 hari Sewa Tripot/Tackel & handle crane 2 T 865,148 A.29
A.8.4.4.10 P-607 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 600 5,453,029 9.8 .
6.15 OH Pekerja 522,410 L.1
3.07 OH Tukang pipa 307,300 L.8
0.62 OH Mandor 113,775 L.10
1.00 bh Pipa Ø 600 mm 588,000 M.1250
1.75 hari Bahan potong pipa T2/mekanik / cilinder 1,137,500 A.9
2.26 hari Sewa Genset 1500 watt 711,585 A.26
3.83 hari Sewa Pompa Submersible 3m3/h 1,098,636 A.28
2.06 hari Sewa Tripot/Tackel & handle crane 2 T 973,823 A.29
A.8.4.4.11 P-608 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 700 6,259,004 11.3 .
7.05 OH Pekerja 598,910 L.1
3.52 OH Tukang pipa 352,300 L.8
0.71 OH Mandor 130,425 L.10

Software RAB Exarch xPro 110/396


1.00 bh Pipa Ø 700 mm 714,000 M.1251
1.97 hari Bahan potong pipa T2/mekanik / cilinder 1,280,500 A.9
2.68 hari Sewa Genset 1500 watt 843,885 A.26
4.38 hari Sewa Pompa Submersible 3m3/h 1,256,486 A.28
2.29 hari Sewa Tripot/Tackel & handle crane 2 T 1,082,498 A.29
A.8.4.4.12 P-609 1.00 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 800 7,011,979 12.7 .
7.95 OH Pekerja 675,410 L.1
3.97 OH Tukang pipa 397,300 L.8
0.80 OH Mandor 147,075 L.10
1.00 bh Pipa Ø 800 mm 787,000 M.1252
2.19 hari Bahan potong pipa T2/mekanik / cilinder 1,423,500 A.9
3.10 hari Sewa Genset 1500 watt 976,185 A.26
4.93 hari Sewa Pompa Submersible 3m3/h 1,414,336 A.28
2.52 hari Sewa Tripot/Tackel & handle crane 2 T 1,191,173 A.29
A.8.4.5.1 P-610 1.00 bh (K3) Pengetesan pipa Ø 50 mm 1,598 0.0 .
0.01 OH Pekerja 680 L.1
0.00 OH Mandor 148 L.10
0.00 m3 Air test (air bersih) 100 M.1000
0.06 Ltr Bahan Bakar 600 M.1489
0.00 Ltr Oli 70 M.1497
A.8.4.5.2 P-611 1.00 m1 (K3) Pengetesan pipa Ø 75 mm 1,698 0.0 .
0.01 OH Pekerja 680 L.1
0.00 OH Mandor 148 L.10
0.00 m3 Air test (air bersih) 200 M.1000
0.06 Ltr Bahan Bakar 600 M.1489
0.00 Ltr Oli 70 M.1497
A.8.4.5.3 P-612 1.00 m1 (K3) Pengetesan pipa Ø 100 mm 1,898 0.0 .
0.01 OH Pekerja 680 L.1
0.00 OH Mandor 148 L.10
0.01 m3 Air test (air bersih) 400 M.1000
0.06 Ltr Bahan Bakar 600 M.1489
0.00 Ltr Oli 70 M.1497
A.8.4.5.4 P-613 1.00 m1 (K3) Pengetesan pipa Ø 150 mm 2,398 0.0 .
0.01 OH Pekerja 680 L.1
0.00 OH Mandor 148 L.10
0.02 m3 Air test (air bersih) 900 M.1000
0.06 Ltr Bahan Bakar 600 M.1489
0.00 Ltr Oli 70 M.1497
A.8.4.5.5 P-614 1.00 m1 (K3) Pengetesan 1 m pipa Ø 200 mm 3,048 0.0 .
0.01 OH Pekerja 680 L.1
0.00 OH Mandor 148 L.10
0.03 m3 Air test (air bersih) 1,550 M.1000
0.06 Ltr Bahan Bakar 600 M.1489
0.00 Ltr Oli 70 M.1497
A.8.4.5.6 P-615 1.00 m1 (K3) Pengetesan pipa Ø 250 mm 3,948 0.0 .
0.01 OH Pekerja 680 L.1
0.00 OH Mandor 148 L.10
0.05 m3 Air test (air bersih) 2,450 M.1000
0.06 Ltr Bahan Bakar 600 M.1489
0.00 Ltr Oli 70 M.1497
A.8.4.5.7 P-616 1.00 m1 (K3) Pengetesan 1 m pipa Ø 300 mm 5,048 0.0 .
0.01 OH Pekerja 680 L.1
0.00 OH Mandor 148 L.10
0.07 m3 Air test (air bersih) 3,550 M.1000
0.06 Ltr Bahan Bakar 600 M.1489
0.00 Ltr Oli 70 M.1497
A.8.4.5.8 P-617 1.00 m1 (K3) Pengetesan pipa Ø 400 mm 7,798 0.0 .
0.01 OH Pekerja 680 L.1
0.00 OH Mandor 148 L.10
0.13 m3 Air test (air bersih) 6,300 M.1000
0.06 Ltr Bahan Bakar 600 M.1489
0.00 Ltr Oli 70 M.1497

Software RAB Exarch xPro 111/396


A.8.4.5.9 P-618 1.00 m1 (K3) Pengetesan 1 m pipa Ø 500 mm 9,398 0.0 .
0.01 OH Pekerja 680 L.1
0.00 OH Mandor 148 L.10
0.16 m3 Air test (air bersih) 7,900 M.1000
0.06 Ltr Bahan Bakar 600 M.1489
0.00 Ltr Oli 70 M.1497
A.8.4.5.10 P-619 1.00 m1 (K3) Pengetesan pipa Ø 600 mm 15,648 0.0 .
0.01 OH Pekerja 680 L.1
0.00 OH Mandor 148 L.10
0.28 m3 Air test (air bersih) 14,150 M.1000
0.06 Ltr Bahan Bakar 600 M.1489
0.00 Ltr Oli 70 M.1497
A.8.4.6.1 P-620 1.00 titik (K3) Pemasangan titik lampu 417,938 0.4 .
0.15 OH Pekerja 12,750 L.1
0.15 OH Tukang batu 15,000 L.3
0.03 OH Kepala tukang 4,500 L.9
0.03 OH Mandor 5,550 L.10
0.28 btg Pipa listrik 5/8” 3,538 M.1462
24.00 m Kabel NYM 3x2,5 mm2-SNI 249,600 M.88
3.00 bh Tee Doos 4,500 M.1461
4.00 bh L.Bow 40,000 M.1161
3.00 bh Las Dop 3,000 M.1458
24.00 bh Klem Pipa Listrik 18,000 M.1457
1.00 bh Mongkok (Listrik) 1,500 M.1459
1.00 bh Saklar (standar) 35,000 M.1460
1.00 bh Fitting Lampu 25,000 M.93
A.8.4.6.2 P-621 1.00 titik Memasang Instalasi Penerangan 235,525 0.4 .
0.15 OH Pekerja 12,750 L.1
0.15 OH Tukang batu 15,000 L.3
0.03 OH Kepala tukang 4,500 L.9
0.03 OH Mandor 5,550 L.10
11.00 M' Kabel NYM 3x2,5 mm2-SNI 114,400 M.88
11.00 M' Pipa Conduit 57,200 M.1163
1.00 bh Socket Pipa 14,000 M.1165
2.00 bh Tee Doos 3,000 M.1461
3.00 bh Klem Pipa 4,500 M.1160
6.00 bh Sekrup fixer 1,500 M.1154
2.00 bh Las Dop 2,000 M.1458
0.25 bh Sealtape 1,125 M.144

DAFTAR ANALISA UTAMA


Analisa Harga Satuan Pekerjaan SNI 2008 (Pembaharuan 2018)
SNI-2002 S-001 1.00 m1 Pek. Pengukuran & Pemasangan Bowplank 87,925 0.2 .
0.01 m3 Kayu Kaso 5 / 7 (borneo/meranti) 42,000 M.1048
0.01 m3 Kayu Papan 3 / 20 borneo/meranti 24,500 M.1083
0.02 kg Paku Biasa 2" - 5" 500 M.111
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala tukang 1,500 L.9
0.01 oh Mandor 925 L.10
SNI 2008 S-002 1.00 m2 Pekerjaan Pengukuran Gedung 16,194 0.1 .
0.08 oh Pekerja 6,800 L.1
0.02 oh Mandor 3,700 L.10
0.01 oh Mandor 925 L.10
0.02 oh Asisten Ahli Ukur 4,119 L.25
0.01 hr Sewa alat ukur 650 A.23
SNI-2002 S-003 1.00 m2 Membersihkan Lapangan dan Perataan 17,750 0.2 .
0.10 oh Pekerja 8,500 L.1
0.05 oh Mandor 9,250 L.10
AK-SNI 2008 S-004 1.00 m2 Pembuatan jalan sementara, tebal 25 cm 188,850 1.1 .
0.28 m3 Batu belah 68,750 M.5
0.03 m3 Kerikil 6,600 M.7

Software RAB Exarch xPro 112/396


0.05 m3 Pasir Urug 10,000 M.10
1.00 oh Pekerja 85,000 L.1
0.10 oh Mandor 18,500 L.10
SNI-2002 S-005 1.00 m2 Pembuatan Jalan Sementara 156,800 1.1 .
0.15 m3 Batu belah 37,500 M.5
0.09 m3 Batu belah 22,500 M.5
0.01 m3 Pasir pasang 2,550 M.9
1.00 oh Pekerja 85,000 L.1
0.05 oh Mandor 9,250 L.10
SNI-2002 S-006 1.00 m2 Pek. Kantor Direksi Keet , dengan lantai plesteran 1,459,925 5.4 .
1.25 btg Dolken kayu Ø 8-10/400 cm 31,250 M.104
0.18 m3 Kayu balok borneo 630,000 M.1068
0.85 kg Paku Biasa 2" - 5" 21,250 M.111
1.10 kg Baja strip (0,2 x 2) cm 13,750 M.15
35.00 kg Semen 45,500 M.12
0.15 m3 Pasir pasang 38,250 M.9
0.10 m3 Pasir beton 25,000 M.8
0.15 m3 Koral Beton 32,475 M.1018
30.00 bh Bata merah 19,500 M.2
0.25 lbr Seng Gelombang 3" x 6" BJLS 28 17,500 M.61
0.50 bh Jendela nako (rangka + kaca 5 mm) 27,500 M.136
0.08 m2 Kaca Polos 8,800 M.1467
0.15 bh Kunci tanam biasa 19,500 M.1520
0.06 lbr Plywood 120x240 tbl. 4 mm 5,400 M.58
2.00 oh Pekerja 170,000 L.1
2.00 oh Tukang kayu 200,000 L.6
1.00 oh Tukang batu 100,000 L.3
0.30 oh Kepala tukang 45,000 L.9
0.05 oh Mandor 9,250 L.10
SNI-2002 S-007 1.00 m1 Pagar Sementara dari Seng Gelombang tinggi 2 m 449,399 0.6 .
1.25 btg Dolken kayu Ø 8-10/400 cm 31,250 M.104
2.50 Kg Semen 3,250 M.12
1.20 lbr Seng Gelombang 3" x 6" BJLS 28 84,000 M.61
0.01 m3 Pasir beton 1,250 M.8
0.01 m3 Koral Beton 1,949 M.1018
0.07 m3 Kaso 5/7 ( albasiah/meranti ) 252,000 M.1042
0.06 Kg Paku Biasa 2" - 5" 1,500 M.111
0.45 Lt Meni Besi 13,500 M.1342
0.40 oh Pekerja 34,000 L.1
0.20 oh Tukang kayu 20,000 L.6
0.02 oh Kepala tukang 3,000 L.9
0.02 oh Mandor 3,700 L.10
SNI-2002 S-008 1.00 m1 Pagar Sementara dari Kawat Duri tinggi 1.8 m 1,459,499 0.5 .
1.00 btg Dolken kayu Ø 8-10/400 cm 25,000 M.104
2.00 Kg Semen 2,600 M.12
25.00 Kg Kawat Duri 1,375,000 M.1122
0.01 m3 Pasir beton 1,250 M.8
0.01 m3 Koral Beton 1,949 M.1018
0.06 Kg Paku Biasa 2" - 5" 1,500 M.111
0.30 oh Pekerja 25,500 L.1
0.20 oh Tukang kayu 20,000 L.6
0.02 oh Kepala tukang 3,000 L.9
0.02 oh Mandor 3,700 L.10
SNI-2002 S-009 1.00 m1 Pagar Sementara dari Kayu tinggi 2 m 355,299 0.6 .
1.25 btg Dolken kayu Ø 8-10/400 cm 31,250 M.104
2.50 Kg Semen 3,250 M.12
0.01 m3 Pasir beton 1,250 M.8
0.01 m3 Koral Beton 1,949 M.1018
0.07 m3 Kaso 5/7 ( albasiah/meranti ) 252,000 M.1042
0.06 Kg Paku Biasa 2" - 5" 1,500 M.111
0.40 Lt Residu 3,400 M.1499
0.40 oh Pekerja 34,000 L.1

Software RAB Exarch xPro 113/396


0.20 oh Tukang kayu 20,000 L.6
0.02 oh Kepala tukang 3,000 L.9
0.02 oh Mandor 3,700 L.10
SNI-2002 S-010 1.00 m1 Pasang pagar kawat jaring galvanis, tinggi 1,00 m 23,930 0.1 .
0.43 lbr Pagar kawat jaring 15,190 M.1130
0.04 oh Pekerja 3,570 L.1
0.04 oh Tukang besi 4,200 L.4
0.00 oh Kepala Tukang 600 L.9
0.00 oh Mandor 370 L.10
SNI-2002 S-011 1.00 m2 Pembuatan Gudang Semen dan Alat - alat 1,313,725 3.3 .
1.70 btg Dolken kayu Ø 8-10/400 cm 42,500 M.104
0.21 m3 Kayu balok borneo 735,000 M.1068
0.30 Kg Paku Biasa 2" - 5" 7,500 M.111
10.50 Kg Semen 13,650 M.12
0.03 m3 Pasir beton 7,500 M.8
0.05 m3 Koral Beton 10,825 M.1018
1.50 lbr Seng Gelombang BJLS 32 172,500 M.1321
1.00 oh Pekerja 85,000 L.1
2.00 oh Tukang kayu 200,000 L.6
0.20 oh Kepala tukang 30,000 L.9
0.05 oh Mandor 9,250 L.10
SNI-2002 S-012 1.00 m2 Pembuatan Rumah Jaga / Konstruksi Kayu 1,497,750 2.7 .
3.00 btg Dolken kayu Ø 8-10/400 cm 75,000 M.104
0.28 m3 Kayu balok borneo 966,000 M.1068
0.70 Kg Paku Biasa 2" - 5" 17,500 M.111
1.50 lbr Seng Gelombang BJLS 32 172,500 M.1321
1.00 oh Pekerja 85,000 L.1
1.50 oh Tukang kayu 150,000 L.6
0.15 oh Kepala tukang 22,500 L.9
0.05 oh Mandor 9,250 L.10
SNI-2002 S-013 1.00 m2 Pembuatan Bedeng Buruh 1,349,725 3.3 .
1.25 btg Dolken kayu Ø 8-10/400 cm 31,250 M.104
0.19 m3 Kayu balok borneo 651,000 M.1068
0.30 Kg Paku Biasa 2" - 5" 7,500 M.111
18.00 Kg Semen 23,400 M.12
0.03 m3 Pasir beton 7,500 M.8
0.05 m3 Koral Beton 10,825 M.1018
1.50 lbr Seng Gelombang BJLS 32 172,500 M.1321
1.35 lbr Plywood 120x240 tbl. 4 mm 121,500 M.58
1.00 oh Pekerja 85,000 L.1
2.00 oh Tukang kayu 200,000 L.6
0.20 oh Kepala tukang 30,000 L.9
0.05 oh Mandor 9,250 L.10
SNI-2002 S-014 1.00 m2 Pembuatan Bak Adukan ( 40 x 50 x 20 ) cm 171,278 0.0 .
0.04 m3 Papan kayu 3/20 Kelas II 117,000 M.1089
0.08 Kg Paku Biasa 2" - 5" 2,000 M.111
1.00 btg Kayu Kaso 5 / 7 (borneo) 49,000 M.1047
0.03 oh Tukang kayu 3,000 L.6
0.00 oh Mandor 278 L.10
SNI-2002 S-015 1.00 m2 Pembuatan Stegger dari Bambu, ( 40 x 50 x 20 ) cm 65,533 0.3 .
1.00 btg Bambu Ø 6 - 8 / 600 cm 18,000 M.103
0.25 Kg Tali ijuk 5,850 M.1538
0.00 oh Pekerja 170 L.1
0.02 oh Tukang kayu 1,700 L.6
0.25 oh Kepala tukang 37,500 L.9
0.01 oh Mandor 2,313 L.10
SNI-2002 S-016 1.00 m1 Pasang pagar beton pracetak ( 5 x 50 x 213 ) cm 431,530 0.5 .
0.99 lbr Panel beton pracetak 147,900 M.1482
0.53 btg Kolom beton pracetak 105,840 M.1481
0.07 m3 Pasir beton 18,500 M.8
0.15 m3 Batu pecah 2/3 51,100 M.1011
45.00 kg Semen 58,500 M.12

Software RAB Exarch xPro 114/396


0.38 oh Pekerja 31,875 L.1
0.13 oh Tukang batu 12,500 L.3
0.01 oh Kepala tukang 1,800 L.9
0.02 oh Mandor 3,515 L.10
AK-SNI 2008 S-017 1.00 bh Membuat Papan Nama Proyek 80x120 cm (bahan seng) 920,425 5.1 .
0.04 m3 Papan kayu 3/20 Kelas II 113,750 M.1089
1.40 lbr Seng Gelombang 3" x 6" BJLS 28 98,000 M.61
0.60 kg Paku Biasa 2" - 5" 15,000 M.111
1.50 kg Cat kayu 90,000 M.72
16.80 kg Semen 21,840 M.12
0.03 m3 Pasir beton 6,750 M.8
0.04 m3 Kerikil 8,910 M.7
2.10 oh Pekerja 178,500 L.1
0.02 oh Tukang batu 1,750 L.3
1.00 oh Tukang kayu 100,000 L.6
1.00 oh Tukang cat 100,000 L.5
1.01 oh Mandor 185,925 L.10
AK-SNI 2008 S-018 1.00 bh Membuat Papan Nama Proyek 80x120 cm (bahan flexi) 615,500 3.1 .
0.04 m3 Papan kayu 3/20 Kelas II 113,750 M.1089
1.00 m2 Print outdoor flexi 54,000 M.1399
0.60 kg Paku Biasa 2" - 5" 15,000 M.111
1.50 kg Cat kayu 90,000 M.72
16.80 kg Semen 21,840 M.12
0.03 m3 Pasir beton 6,750 M.8
0.04 m3 Kerikil 8,910 M.7
0.02 oh Tukang batu 1,750 L.3
1.00 oh Tukang kayu 100,000 L.6
1.00 oh Tukang cat 100,000 L.5
1.00 oh Pekerja 85,000 L.1
0.10 oh Mandor 18,500 L.10
AK-SNI 2008 S-019 1.00 m3 Membongkar pasangan batu kali 434,000 4.4 .
4.00 oh Tukang batu 400,000 L.3
0.40 oh Pekerja 34,000 L.1
AK-SNI 2008 S-020 1.00 m3 Membongkar pasangan batu merah dan membersihkan 208,500 2.1 .
2.00 oh Tukang batu 200,000 L.3
0.10 oh Pekerja 8,500 L.1
AK-SNI 2008 S-021 1.00 m3 Membongkar beton bertulang dan membersihkan 718,500 8.3 .
0.20 oh Tukang batu 20,000 L.3
8.00 oh Pekerja 680,000 L.1
0.10 oh Mandor 18,500 L.10
AK-SNI 2008 S-022 1.00 m2 Pekerjaan bongkar lantai tegel untuk dipergunakan lagi 18,850 0.2 .
0.20 oh Pekerja 17,000 L.1
0.01 oh Mandor 1,850 L.10
AK-SNI 2008 S-023 1.00 m2 Mengupas plesteran lama 12,938 0.1 .
0.13 oh Pekerja 10,625 L.1
0.01 oh Mandor 2,313 L.10
AK-SNI 2008 S-024 1.00 m2 Membongkar genteng / sirap untuk dipergunakan lagi 18,850 0.2 .
0.20 oh Pekerja 17,000 L.1
0.01 oh Mandor 1,850 L.10
AK-SNI 2008 S-025 1.00 m2 Membongkar atap seng 13,500 0.2 .
0.05 oh Tukang besi 5,000 L.4
0.10 oh Pekerja 8,500 L.1
AK-SNI 2008 S-026 1.00 m2 Membongkar usuk / reng dipakai lagi 25,750 0.3 .
0.06 oh Tukang kayu 6,000 L.6
0.01 oh Kepala Tukang 900 L.9
0.20 oh Pekerja 17,000 L.1
0.01 oh Mandor 1,850 L.10
AK-SNI 2008 S-027 1.00 m2 Membongkar usuk / reng tidak dipakai lagi 18,850 0.2 .
0.20 oh Pekerja 17,000 L.1
0.01 oh Mandor 1,850 L.10
AK-SNI 2008 S-028 1.00 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jem 1,067,000 10.8 .
6.00 oh Tukang kayu 600,000 L.6

Software RAB Exarch xPro 115/396


0.60 oh Kepala Tukang 90,000 L.9
4.00 oh Pekerja 340,000 L.1
0.20 oh Mandor 37,000 L.10
AK-SNI 2008 S-029 1.00 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jem 122,000 1.2 .
1.00 oh Pekerja 85,000 L.1
0.20 oh Mandor 37,000 L.10
AK-SNI 2008 S-030 1.00 m3 Mengerjakan kembali bangunan kayu yang telah dibongk 1,757,000 17.4 .
12.00 oh Tukang kayu 1,200,000 L.6
1.20 oh Kepala Tukang 180,000 L.9
4.00 oh Pekerja 340,000 L.1
0.20 oh Mandor 37,000 L.10
SNI-2007 S-031 1.00 m3 Menggali tanah biasa sedalam 1 meter 68,375 0.8 .
0.75 oh Pekerja 63,750 L.1
0.03 oh Mandor 4,625 L.10
SNI-2007 S-032 1.00 m3 Menggali tanah biasa sedalam 2 meter 84,825 0.9 .
0.90 oh Pekerja 76,500 L.1
0.05 oh Mandor 8,325 L.10
SNI-2007 S-033 1.00 m3 Menggali tanah biasa sedalam 3 meter 101,645 1.1 .
1.05 oh Pekerja 89,250 L.1
0.07 oh Mandor 12,395 L.10
SNI-2007 S-034 1.00 m3 Menggali tanah keras sedalam 1 meter 90,920 1.0 .
1.00 oh Pekerja 85,000 L.1
0.03 oh Mandor 5,920 L.10
SNI-2007 S-035 1.00 m3 Menggali tanah cadas sedalam 1 meter 138,600 1.6 .
1.50 oh Pekerja 127,500 L.1
0.06 oh Mandor 11,100 L.10
SNI-2007 S-036 1.00 m3 Menggali tanah lumpur sedalam 1 meter 110,325 1.2 .
1.20 oh Pekerja 102,000 L.1
0.05 oh Mandor 8,325 L.10
SNI-2007 S-037 1.00 m2 Mengerjakan stripping tebing setinggi 1 meter 5,175 0.1 .
0.05 oh Pekerja 4,250 L.1
0.01 oh Mandor 925 L.10
SNI-2002 S-038 1.00 m3 Urug kembali bekas galian 19,835 0.2 .
0.19 oh Pekerja 16,320 L.1
0.02 oh Mandor 3,515 L.10
SNI-2007 S-039 1.00 m3 Membuang tanah sejauh 30 meter 29,900 0.3 .
0.33 oh Pekerja 28,050 L.1
0.01 oh Mandor 1,850 L.10
SNI-2002 S-040 1.00 m3 Membuang tanah sejauh 150 meter 53,110 0.6 .
0.52 oh Pekerja 43,860 L.1
0.05 oh Mandor 9,250 L.10
SNI-2007 S-041 1.00 m3 Memadatkan tanah (per 20 cm) 51,750 0.6 .
0.50 oh Pekerja 42,500 L.1
0.05 oh Mandor 9,250 L.10
AK-SNI 2008 S-042 1.00 m2 Meratakan tanah ditumbuk halus 23,100 0.3 .
0.25 oh Pekerja 21,250 L.1
0.01 oh Mandor 1,850 L.10
SNI-2007 S-043 1.00 m3 Mengurug pasir urug 267,350 0.3 .
1.20 m3 Pasir urug 240,000 M.10
0.30 oh Pekerja 25,500 L.1
0.01 oh Mandor 1,850 L.10
SNI-2007 S-044 1.00 m3 Memasang Lapisan pudel campuran 1 KP : 3 PP : 7 TL 370,080 1.3 .
0.14 m3 Kapur padam 11,111 M.1014
0.40 m3 Pasir pasang 102,000 M.9
0.95 m3 Tanah Liat 128,170 M.1025
0.80 oh Pekerja 68,000 L.1
0.40 oh Tukang batu 40,000 L.3
0.04 oh Kepala tukang 6,000 L.9
0.08 oh Mandor 14,800 L.10
SNI-2007 S-045 1.00 m3 Memasang Lapisan pudel campuran 1 KP : 5 TL 316,858 1.3 .
0.25 m3 Kapur padam 20,410 M.1014
1.24 m3 Tanah Liat 167,648 M.1025

Software RAB Exarch xPro 116/396


0.80 oh Pekerja 68,000 L.1
0.40 oh Tukang batu 40,000 L.3
0.04 oh Kepala tukang 6,000 L.9
0.08 oh Mandor 14,800 L.10
SNI-2007 S-046 1.00 m3 Memasang lapisan ijuk tebal 10 cm 330,525 0.2 .
1.50 m3 Ijuk 315,000 M.6
0.15 oh Pekerja 12,750 L.1
0.02 oh Mandor 2,775 L.10
SNI-2002 S-047 1.00 m3 Pemasangan lapisan ijuk 267,525 0.2 .
1.20 m3 Ijuk 252,000 M.6
0.15 oh Pekerja 12,750 L.1
0.02 oh Mandor 2,775 L.10
SNI-2007 S-048 1.00 m3 Mengurug sirtu padat untuk peninggian lantai bangunan 312,675 0.3 .
1.20 m3 Sirtu 286,800 M.1024
0.25 oh Pekerja 21,250 L.1
0.03 oh Mandor 4,625 L.10
AK-SNI 2008 S-049 1.00 m3 Urug tanah mendatangkan 219,350 0.3 .
1.20 m3 Tanah urug 192,000 M.14
0.30 oh Pekerja 25,500 L.1
0.01 oh Mandor 1,850 L.10
AK-SNI 2008 S-050 1.00 m3 Membuang tanah dengan menghampar 23,100 0.3 .
0.25 oh Pekerja 21,250 L.1
0.01 oh Mandor 1,850 L.10
AK-SNI 2008 S-051 1.00 m1 Pekerjaan Membuat sumur 360,254 1.8 .
2.00 bh Buis beton D. 80 cm 124,000 M.117
1.00 oh Tukang gali sumur 160,181 L.20
0.74 oh Pekerja 62,475 L.1
0.07 oh Mandor 13,598 L.10
AK-SNI 2008 S-052 1.00 m2 Pekerjaan Gebalan rumput 80,725 0.5 .
0.20 btg Bambu Ø 6 - 8 / 600 cm 3,600 M.103
1.00 m2 Gebalan rumput 30,000 M.1526
0.50 oh Pekerja 42,500 L.1
0.03 oh Mandor 4,625 L.10
SNI-2002 S-053 1.00 m3 Pasangan pondasi 1 Pc : 1 Ps 1,092,295 2.4 .
1.10 m3 Batu belah 275,000 M.5
392.00 kg Semen 509,600 M.12
0.31 m3 Pasir pasang 80,070 M.9
1.50 oh Pekerja 127,500 L.1
0.75 oh Tukang batu 75,000 L.3
0.08 oh Kepala Tukang 11,250 L.9
0.08 oh Mandor 13,875 L.10
SNI-2002 S-054 1.00 m3 Pasangan pondasi 1 Pc : 2 Ps 958,610 2.4 .
1.10 m3 Batu belah 275,000 M.5
267.00 kg Semen 347,100 M.12
0.43 m3 Pasir pasang 108,885 M.9
1.50 oh Pekerja 127,500 L.1
0.75 oh Tukang batu 75,000 L.3
0.08 oh Kepala Tukang 11,250 L.9
0.08 oh Mandor 13,875 L.10
SNI-2007 S-055 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 3 PP 913,900 2.4 .
1.20 m3 Batu belah 300,000 M.5
202.00 kg Semen 262,600 M.12
0.49 m3 Pasir pasang 123,675 M.9
1.50 oh Pekerja 127,500 L.1
0.75 oh Tukang batu 75,000 L.3
0.08 oh Kepala tukang 11,250 L.9
0.08 oh Mandor 13,875 L.10
SNI-2007 S-056 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 4 PP 872,125 2.4 .
1.20 m3 Batu belah 300,000 M.5
163.00 kg Semen 211,900 M.12
0.52 m3 Pasir pasang 132,600 M.9
1.50 oh Pekerja 127,500 L.1

Software RAB Exarch xPro 117/396


0.75 oh Tukang batu 75,000 L.3
0.08 oh Kepala tukang 11,250 L.9
0.08 oh Mandor 13,875 L.10
SNI-2007 S-057 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 5 PP 843,145 2.4 .
1.20 m3 Batu belah 300,000 M.5
136.00 kg Semen 176,800 M.12
0.54 m3 Pasir pasang 138,720 M.9
1.50 oh Pekerja 127,500 L.1
0.75 oh Tukang batu 75,000 L.3
0.08 oh Kepala tukang 11,250 L.9
0.08 oh Mandor 13,875 L.10
SNI-2007 S-058 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 6 PP 822,780 2.4 .
1.20 m3 Batu belah 300,000 M.5
117.00 kg Semen 152,100 M.12
0.56 m3 Pasir pasang 143,055 M.9
1.50 oh Pekerja 127,500 L.1
0.75 oh Tukang batu 75,000 L.3
0.08 oh Kepala tukang 11,250 L.9
0.08 oh Mandor 13,875 L.10
SNI-2007 S-059 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 8 PP 794,845 2.4 .
1.20 m3 Batu belah 300,000 M.5
91.00 kg Semen 118,300 M.12
0.58 m3 Pasir pasang 148,920 M.9
1.50 oh Pekerja 127,500 L.1
0.75 oh Tukang batu 75,000 L.3
0.08 oh Kepala tukang 11,250 L.9
0.08 oh Mandor 13,875 L.10
SNI-2002 S-060 1.00 m3 Pasangan pondasi 1 Kp : 1 Sm : 1 Ps 756,990 2.4 .
1.10 m3 Batu belah 275,000 M.5
0.23 m3 Kapur Pasang 112,210 M.1015
0.23 m3 Semen Warna 3,435 M.13
0.54 m3 Pasir pasang 138,720 M.9
1.50 oh Pekerja 127,500 L.1
0.75 oh Tukang batu 75,000 L.3
0.08 oh Kepala Tukang 11,250 L.9
0.08 oh Mandor 13,875 L.10
SNI-2007 S-061 1.00 m3 Memasang pondasi batu belah, campuran 1 KP : 1 SM : 2 700,175 2.4 .
1.20 m3 Batu belah 300,000 M.5
0.17 m3 Kapur Pasang 83,300 M.1015
0.17 m3 Semen Warna 2,550 M.13
0.34 m3 Pasir pasang 86,700 M.9
1.50 oh Pekerja 127,500 L.1
0.75 oh Tukang batu 75,000 L.3
0.08 oh Kepala tukang 11,250 L.9
0.08 oh Mandor 13,875 L.10
AK-SNI 2008 S-062 1.00 m3 Pasangan pondasi 1 Pc : 3 Kp : 5 Ps 861,291 2.4 .
1.20 m3 Batu belah 300,000 M.5
95.42 kg Semen 124,046 M.12
0.23 m3 Kapur Pasang 112,210 M.1015
0.38 m3 Pasir pasang 97,410 M.9
1.50 oh Pekerja 127,500 L.1
0.75 oh Tukang batu 75,000 L.3
0.08 oh Kepala Tukang 11,250 L.9
0.08 oh Mandor 13,875 L.10
SNI-2007 S-063 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 3 KP : 1 804,415 2.4 .
1.20 m3 Batu belah 300,000 M.5
61.00 kg Semen 79,300 M.12
0.15 m3 Kapur Pasang 72,030 M.1015
0.49 m3 Pasir pasang 125,460 M.9
1.50 oh Pekerja 127,500 L.1
0.75 oh Tukang batu 75,000 L.3
0.08 oh Kepala tukang 11,250 L.9

Software RAB Exarch xPro 118/396


0.08 oh Mandor 13,875 L.10
SNI-2007 S-064 1.00 m3 Memasang pondasi batu belah, campuran 1/4 PC : 1 KP : 778,480 2.4 .
1.20 m3 Batu belah 300,000 M.5
41.00 kg Semen 53,300 M.12
0.13 m3 Kapur Pasang 64,190 M.1015
0.52 m3 Pasir pasang 133,365 M.9
1.50 oh Pekerja 127,500 L.1
0.75 oh Tukang batu 75,000 L.3
0.08 oh Kepala tukang 11,250 L.9
0.08 oh Mandor 13,875 L.10
SNI-2007 S-065 1.00 m3 Memasang batu kosong (aanstamping) 504,765 1.2 .
1.20 m3 Batu belah 300,000 M.5
0.43 m3 Pasir urug 86,400 M.10
0.78 oh Pekerja 66,300 L.1
0.39 oh Tukang batu 39,000 L.3
0.04 oh Kepala tukang 5,850 L.9
0.04 oh Mandor 7,215 L.10
SNI-2007 S-066 1.00 m3 Memasang pondasi siklop, 60% beton campuran 1 PC:2 2,272,022 4.5 .
0.48 m3 Batu belah 120,000 M.5
194.00 kg Semen 252,200 M.12
0.31 m3 Pasir beton 78,000 M.8
0.47 m3 Koral Beton 101,322 M.1018
126.00 kg Besi beton 1,260,000 M.16
1.80 kg Kawat beton 42,300 M.27
3.40 oh Pekerja 289,000 L.1
0.85 oh Tukang batu 85,000 L.3
0.09 oh Kepala tukang 12,750 L.9
0.17 oh Mandor 31,450 L.10
SNI-2007 S-067 1.00 m3 Memasang pondasi siklop, 60% beton campuran 1 PC:2 P 969,722 4.5 .
0.48 m3 Batu belah 120,000 M.5
194.00 kg Semen 252,200 M.12
0.31 m3 Pasir beton 78,000 M.8
0.47 m3 Koral Beton 101,322 M.1018
3.40 oh Pekerja 289,000 L.1
0.85 oh Tukang batu 85,000 L.3
0.09 oh Kepala tukang 12,750 L.9
0.17 oh Mandor 31,450 L.10
SNI-2007 S-068 1.00 m3 Memasang pondasi sumuran, diameter 100 cm 862,037 3.4 .
0.45 m3 Batu belah 112,500 M.5
194.00 kg Semen 252,200 M.12
0.31 m3 Pasir beton 78,000 M.8
0.47 m3 Koral Beton 101,322 M.1018
2.40 oh Pekerja 204,000 L.1
0.80 oh Tukang batu 80,000 L.3
0.08 oh Kepala tukang 12,000 L.9
0.12 oh Mandor 22,015 L.10
SNI-2007 S-069 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm teb 247,500 0.9 .
140.00 bh Bata merah 91,000 M.2
43.50 kg Semen 56,550 M.12
0.08 m3 Pasir pasang 20,400 M.9
0.60 oh Pekerja 51,000 L.1
0.20 oh Tukang batu 20,000 L.3
0.02 oh Kepala tukang 3,000 L.9
0.03 oh Mandor 5,550 L.10
SNI-2007 S-070 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm teb 236,590 0.9 .
140.00 bh Bata merah 91,000 M.2
32.95 kg Semen 42,835 M.12
0.09 m3 Pasir pasang 23,205 M.9
0.60 oh Pekerja 51,000 L.1
0.20 oh Tukang batu 20,000 L.3
0.02 oh Kepala tukang 3,000 L.9
0.03 oh Mandor 5,550 L.10

Software RAB Exarch xPro 119/396


SNI-2007 S-071 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm teb 228,780 0.9 .
140.00 bh Bata merah 91,000 M.2
26.55 kg Semen 34,515 M.12
0.09 m3 Pasir pasang 23,715 M.9
0.60 oh Pekerja 51,000 L.1
0.20 oh Tukang batu 20,000 L.3
0.02 oh Kepala tukang 3,000 L.9
0.03 oh Mandor 5,550 L.10
SNI-2007 S-072 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm teb 225,420 0.9 .
140.00 bh Bata merah 91,000 M.2
22.20 kg Semen 28,860 M.12
0.10 m3 Pasir pasang 26,010 M.9
0.60 oh Pekerja 51,000 L.1
0.20 oh Tukang batu 20,000 L.3
0.02 oh Kepala tukang 3,000 L.9
0.03 oh Mandor 5,550 L.10
SNI-2007 S-073 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm teb 225,710 0.9 .
140.00 bh Bata merah 91,000 M.2
18.50 kg Semen 24,050 M.12
0.12 m3 Pasir pasang 31,110 M.9
0.60 oh Pekerja 51,000 L.1
0.20 oh Tukang batu 20,000 L.3
0.02 oh Kepala tukang 3,000 L.9
0.03 oh Mandor 5,550 L.10
SNI-2007 S-074 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm teb 209,505 0.9 .
140.00 bh Bata merah 91,000 M.2
10.08 kg Semen 13,104 M.12
0.09 m3 Pasir pasang 23,588 M.9
0.03 m3 Kapur padam 2,263 M.1014
0.60 oh Pekerja 51,000 L.1
0.20 oh Tukang batu 20,000 L.3
0.02 oh Kepala tukang 3,000 L.9
0.03 oh Mandor 5,550 L.10
SNI-2007 S-075 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm teb 119,600 0.4 .
70.00 bh Bata merah 45,500 M.2
18.95 kg Semen 24,635 M.12
0.04 m3 Pasir pasang 9,690 M.9
0.30 oh Pekerja 25,500 L.1
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala tukang 1,500 L.9
0.02 oh Mandor 2,775 L.10
SNI-2007 S-076 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm teb 114,156 0.4 .
70.00 bh Bata merah 45,500 M.2
14.37 kg Semen 18,681 M.12
0.04 m3 Pasir pasang 10,200 M.9
0.30 oh Pekerja 25,500 L.1
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala tukang 1,500 L.9
0.02 oh Mandor 2,775 L.10
SNI-2007 S-077 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm teb 111,190 0.4 .
70.00 bh Bata merah 45,500 M.2
11.50 kg Semen 14,950 M.12
0.04 m3 Pasir pasang 10,965 M.9
0.30 oh Pekerja 25,500 L.1
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala tukang 1,500 L.9
0.02 oh Mandor 2,775 L.10
SNI-2007 S-078 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm teb 109,334 0.4 .
70.00 bh Bata merah 45,500 M.2
9.68 kg Semen 12,584 M.12
0.05 m3 Pasir pasang 11,475 M.9
0.30 oh Pekerja 25,500 L.1

Software RAB Exarch xPro 120/396


0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala tukang 1,500 L.9
0.02 oh Mandor 2,775 L.10
SNI-2007 S-079 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm teb 108,586 0.4 .
70.00 bh Bata merah 45,500 M.2
8.32 kg Semen 10,816 M.12
0.05 m3 Pasir pasang 12,495 M.9
0.30 oh Pekerja 25,500 L.1
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala tukang 1,500 L.9
0.02 oh Mandor 2,775 L.10
SNI-2007 S-080 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) tebal 106,475 0.4 .
70.00 bh Bata merah 45,500 M.2
6.50 kg Semen 8,450 M.12
0.05 m3 Pasir pasang 12,750 M.9
0.30 oh Pekerja 25,500 L.1
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala tukang 1,500 L.9
0.02 oh Mandor 2,775 L.10
SNI-2007 S-081 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm teb 105,110 0.4 .
70.00 bh Bata merah 45,500 M.2
4.50 kg Semen 5,850 M.12
0.05 m3 Pasir pasang 12,750 M.9
0.02 m3 Kapur padam 1,235 M.1014
0.30 oh Pekerja 25,500 L.1
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala tukang 1,500 L.9
0.02 oh Mandor 2,775 L.10
SNI-2007 S-082 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm te 91,616 0.4 .
70.00 bh Bata merah 45,500 M.2
0.02 m3 Semen Warna 270 M.13
0.02 m3 Pasir pasang 4,590 M.9
0.02 m3 Kapur padam 1,481 M.1014
0.30 oh Pekerja 25,500 L.1
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala tukang 1,500 L.9
0.02 oh Mandor 2,775 L.10
SNI-2007 S-083 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm teb 93,777 0.4 .
70.00 bh Bata merah 45,500 M.2
0.01 m3 Semen Warna 210 M.13
0.03 m3 Pasir pasang 7,140 M.9
0.01 m3 Kapur padam 1,152 M.1014
0.30 oh Pekerja 25,500 L.1
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala tukang 1,500 L.9
0.02 oh Mandor 2,775 L.10
SNI-2007 S-084 1.00 m2 Memasang dinding HB 20, campuran spesi 1 PC : 3 PP 411,161 0.5 .
12.50 bh Hollow Block 20 137,500 M.1479
30.32 kg Semen 39,416 M.12
0.73 m3 Pasir pasang 185,640 M.9
0.28 kg Besi angkur Ø=8 mm 3,080 M.1110
0.30 oh Pekerja 25,500 L.1
0.15 oh Tukang batu 15,000 L.3
0.02 oh Kepala tukang 2,250 L.9
0.02 oh Mandor 2,775 L.10
SNI-2007 S-085 1.00 m2 Memasang dinding HB 20, campuran spesi 1 PC : 4 PP 414,503 0.5 .
12.50 bh Hollow Block 20 137,500 M.1479
24.26 kg Semen 31,538 M.12
0.77 m3 Pasir pasang 196,860 M.9
0.28 kg Besi angkur Ø=8 mm 3,080 M.1110
0.30 oh Pekerja 25,500 L.1
0.15 oh Tukang batu 15,000 L.3

Software RAB Exarch xPro 121/396


0.02 oh Kepala tukang 2,250 L.9
0.02 oh Mandor 2,775 L.10
SNI-2007 S-086 1.00 m2 Memasang dinding HB 15, campuran spesi 1 PC : 3 PP 308,122 0.5 .
12.50 bh Hollow Block 15 87,500 M.1478
22.74 kg Semen 29,562 M.12
0.55 m3 Pasir pasang 140,250 M.9
0.28 kg Besi angkur Ø=8 mm 3,080 M.1110
0.36 oh Pekerja 30,600 L.1
0.12 oh Tukang batu 12,000 L.3
0.01 oh Kepala tukang 1,800 L.9
0.02 oh Mandor 3,330 L.10
SNI-2007 S-087 1.00 m2 Memasang dinding HB 15, campuran spesi 1 PC : 4 PP 310,380 0.5 .
12.50 bh Hollow Block 15 87,500 M.1478
18.20 kg Semen 23,660 M.12
0.58 m3 Pasir pasang 148,410 M.9
0.28 kg Besi angkur Ø=8 mm 3,080 M.1110
0.36 oh Pekerja 30,600 L.1
0.12 oh Tukang batu 12,000 L.3
0.01 oh Kepala tukang 1,800 L.9
0.02 oh Mandor 3,330 L.10
SNI-2007 S-088 1.00 m2 Memasang dinding HB 10, campuran spesi 1 PC : 3 PP 236,633 0.4 .
12.50 bh Hollow Block 10 81,250 M.1477
15.16 kg Semen 19,708 M.12
0.36 m3 Pasir pasang 92,820 M.9
0.28 kg Besi angkur Ø=8 mm 3,080 M.1110
0.30 oh Pekerja 25,500 L.1
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala tukang 1,500 L.9
0.02 oh Mandor 2,775 L.10
SNI-2007 S-089 1.00 m2 Memasang dinding HB 10, campuran spesi 1 PC : 4 PP 238,814 0.4 .
12.50 bh Hollow Block 10 81,250 M.1477
12.13 kg Semen 15,769 M.12
0.39 m3 Pasir pasang 98,940 M.9
0.28 kg Besi angkur Ø=8 mm 3,080 M.1110
0.30 oh Pekerja 25,500 L.1
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala tukang 1,500 L.9
0.02 oh Mandor 2,775 L.10
SNI-2007 S-090 1.00 m2 Memasang dinding terawang (roster) ukuran 25 x 25 cm, 306,135 0.4 .
16.00 bh Roster 25/25 cm 240,000 M.1486
14.00 kg Semen 18,200 M.12
0.03 m3 Pasir pasang 8,160 M.9
0.30 oh Pekerja 25,500 L.1
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala tukang 1,500 L.9
0.02 oh Mandor 2,775 L.10
SNI-2007 S-091 1.00 m2 Memasang dinding terawang (roster) ukuran (12 x 11 x 24 321,135 0.4 .
30.00 bh Terawang (roster) 255,000 M.1488
14.00 kg Semen 18,200 M.12
0.03 m3 Pasir pasang 8,160 M.9
0.30 oh Pekerja 25,500 L.1
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala tukang 1,500 L.9
0.02 oh Mandor 2,775 L.10
SNI-2007 S-092 1.00 m2 Memasang dinding terawang (roster) ukuran (12 x 11 x 24 318,000 0.4 .
30.00 bh Terawang (roster) 255,000 M.1488
11.00 kg Semen 14,300 M.12
0.04 m3 Pasir pasang 8,925 M.9
0.30 oh Pekerja 25,500 L.1
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala tukang 1,500 L.9
0.02 oh Mandor 2,775 L.10

Software RAB Exarch xPro 122/396


SNI-2007 S-093 1.00 m2 Memasang dinding bata berongga ekspose ukuran (5 x 11 176,885 0.5 .
70.00 bh Bata berongga 105,000 M.1004
14.00 kg Semen 18,200 M.12
0.03 m3 Pasir pasang 8,160 M.9
0.30 oh Pekerja 25,500 L.1
0.15 oh Tukang batu 15,000 L.3
0.02 oh Kepala tukang 2,250 L.9
0.02 oh Mandor 2,775 L.10
SNI-2002 S-094 1.00 m2 Pasangan dinding batako 133,200 0.6 .
12.50 bh Batako 48,125 M.3
12.50 kg Semen 16,250 M.12
0.04 m3 Pasir pasang 10,200 M.9
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala Tukang 1,500 L.9
0.50 oh Pekerja 42,500 L.1
0.03 oh Mandor 4,625 L.10
SNI-2002 S-095 1.00 m1 Memasang rollag bata , campuran spesi 1 PC : 3 PP 32,901 0.1 .
17.00 bh Bata merah 11,050 M.2
4.94 kg Semen 6,425 M.12
0.01 m3 Pasir pasang 3,494 M.9
0.09 oh Pekerja 7,650 L.1
0.03 oh Tukang batu 3,000 L.3
0.00 oh Kepala tukang 450 L.9
0.00 oh Mandor 833 L.10
SNI-2007 S-096 1.00 m3 Membuat beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2 834,540 2.0 .
247.00 kg Semen 321,100 M.12
0.62 m3 Pasir beton 155,175 M.8
0.74 m3 Koral beton 160,210 M.1018
215.00 Ltr Air 10,750 M.1
1.65 oh Pekerja 140,250 L.1
0.28 oh Tukang batu 27,500 L.3
0.03 oh Kepala tukang 4,200 L.9
0.08 oh Mandor 15,355 L.10
SNI-2007 S-097 1.00 m3 Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (1 866,993 2.0 .
276.00 kg Semen 358,800 M.12
0.59 m3 Pasir beton 147,850 M.8
0.75 m3 Koral beton 162,288 M.1018
215.00 Ltr Air 10,750 M.1
1.65 oh Pekerja 140,250 L.1
0.28 oh Tukang batu 27,500 L.3
0.03 oh Kepala tukang 4,200 L.9
0.08 oh Mandor 15,355 L.10
SNI-2007 S-098 1.00 m3 Membuat beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 892,519 2.0 .
299.00 kg Semen 388,700 M.12
0.57 m3 Pasir beton 142,675 M.8
0.75 m3 Koral beton 163,089 M.1018
215.00 Ltr Air 10,750 M.1
1.65 oh Pekerja 140,250 L.1
0.28 oh Tukang batu 27,500 L.3
0.03 oh Kepala tukang 4,200 L.9
0.08 oh Mandor 15,355 L.10
SNI-2007 S-099 1.00 m3 Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), s 769,267 1.5 .
230.00 kg Semen 299,000 M.12
0.64 m3 Pasir beton 159,475 M.8
0.76 m3 Koral beton 164,692 M.1018
200.00 Ltr Air 10,000 M.1
1.20 oh Pekerja 102,000 L.1
0.20 oh Tukang batu 20,000 L.3
0.02 oh Kepala tukang 3,000 L.9
0.06 oh Mandor 11,100 L.10
SNI-2007 S-100 1.00 m3 Membuat beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 922,596 2.0 .
326.00 kg Semen 423,800 M.12

Software RAB Exarch xPro 123/396


0.54 m3 Pasir beton 135,725 M.8
0.76 m3 Koral beton 165,016 M.1018
215.00 Ltr Air 10,750 M.1
1.65 oh Pekerja 140,250 L.1
0.28 oh Tukang batu 27,500 L.3
0.03 oh Kepala tukang 4,200 L.9
0.08 oh Mandor 15,355 L.10
SNI-2007 S-101 1.00 m3 Membuat beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 951,521 2.0 .
352.00 kg Semen 457,600 M.12
0.52 m3 Pasir beton 130,525 M.8
0.76 m3 Koral beton 165,341 M.1018
215.00 Ltr Air 10,750 M.1
1.65 oh Pekerja 140,250 L.1
0.28 oh Tukang batu 27,500 L.3
0.03 oh Kepala tukang 4,200 L.9
0.08 oh Mandor 15,355 L.10
SNI-2007 S-102 1.00 m3 Membuat beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 972,922 2.0 .
371.00 kg Semen 482,300 M.12
0.50 m3 Pasir beton 124,650 M.8
0.78 m3 Koral beton 167,917 M.1018
215.00 Ltr Air 10,750 M.1
1.65 oh Pekerja 140,250 L.1
0.28 oh Tukang batu 27,500 L.3
0.03 oh Kepala tukang 4,200 L.9
0.08 oh Mandor 15,355 L.10
SNI-2007 S-103 1.00 m3 Membuat beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 987,448 2.0 .
384.00 kg Semen 499,200 M.12
0.49 m3 Pasir beton 123,575 M.8
0.77 m3 Koral beton 166,618 M.1018
215.00 Ltr Air 10,750 M.1
1.65 oh Pekerja 140,250 L.1
0.28 oh Tukang batu 27,500 L.3
0.03 oh Kepala tukang 4,200 L.9
0.08 oh Mandor 15,355 L.10
SNI-2007 S-104 1.00 m3 Membuat beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 1,012,545 2.0 .
406.00 kg Semen 527,800 M.12
0.49 m3 Pasir beton 122,150 M.8
0.76 m3 Koral beton 164,540 M.1018
215.00 Ltr Air 10,750 M.1
1.65 oh Pekerja 140,250 L.1
0.28 oh Tukang batu 27,500 L.3
0.03 oh Kepala tukang 4,200 L.9
0.08 oh Mandor 15,355 L.10
SNI-2007 S-105 1.00 m3 Membuat beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 1,020,294 2.0 .
413.00 kg Semen 536,900 M.12
0.49 m3 Pasir beton 121,600 M.8
0.76 m3 Koral beton 163,739 M.1018
215.00 Ltr Air 10,750 M.1
1.65 oh Pekerja 140,250 L.1
0.28 oh Tukang batu 27,500 L.3
0.03 oh Kepala tukang 4,200 L.9
0.08 oh Mandor 15,355 L.10
SNI-2007 S-106 1.00 m3 Membuat beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 1,100,611 2.6 .
439.00 kg Semen 570,700 M.12
0.48 m3 Pasir beton 119,650 M.8
0.75 m3 Koral beton 161,336 M.1018
215.00 Ltr Air 10,750 M.1
2.10 oh Pekerja 178,500 L.1
0.35 oh Tukang batu 35,000 L.3
0.04 oh Kepala tukang 5,250 L.9
0.11 oh Mandor 19,425 L.10
SNI-2007 S-107 1.00 m3 Membuat beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 1,110,787 2.6 .

Software RAB Exarch xPro 124/396


448.00 kg Semen 582,400 M.12
0.48 m3 Pasir beton 119,100 M.8
0.74 m3 Koral beton 160,362 M.1018
215.00 Ltr Air 10,750 M.1
2.10 oh Pekerja 178,500 L.1
0.35 oh Tukang batu 35,000 L.3
0.04 oh Kepala tukang 5,250 L.9
0.11 oh Mandor 19,425 L.10
SNI-2007 S-108 1.00 m3 Membuat beton kedap air dengan strorox – 100 1,102,375 2.6 .
400.00 kg Semen 520,000 M.12
0.48 m3 Pasir beton 120,000 M.8
0.80 m3 Koral Beton 173,200 M.1018
1.20 kg Strorox - 100 51,000 M.1537
2.10 oh Pekerja 178,500 L.1
0.35 oh Tukang batu 35,000 L.3
0.04 oh Kepala tukang 5,250 L.9
0.11 oh Mandor 19,425 L.10
SNI-2007 S-109 1.00 kg Pembesian dengan besi ulir 12,327 0.0 .
1.05 kg Besi beton 10,500 M.16
0.02 kg Kawat beton 353 M.27
0.01 oh Pekerja 595 L.1
0.01 oh Tukang besi 700 L.4
0.00 oh Kepala tukang 105 L.9
0.00 oh Mandor 74 L.10
SNI-2007 S-110 1.00 kg Pembesian dengan besi polos 12,327 0.0 .
1.05 kg Besi beton 10,500 M.16
0.02 kg Kawat beton 353 M.27
0.01 oh Pekerja 595 L.1
0.01 oh Tukang besi 700 L.4
0.00 oh Kepala tukang 105 L.9
0.00 oh Mandor 74 L.10
SNI-2007 S-111 1.00 kg Memasang kabel presstressed polos/strands 11,791 0.0 .
1.05 kg Besi beton 10,500 M.16
0.01 kg Kawat beton 235 M.27
0.01 oh Pekerja 425 L.1
0.01 oh Tukang besi 500 L.4
0.00 oh Kepala tukang 75 L.9
0.00 oh Mandor 56 L.10
SNI-2007 S-112 10.00 kg Memasang jaring kawat baja/wire mesh 13,214 0.0 .
1.02 kg Jaring kawat baja dilas 12,240 M.1528
0.01 kg Kawat beton 118 M.27
0.00 oh Pekerja 213 L.1
0.00 oh Tukang besi 250 L.4
0.00 oh Kepala tukang 375 L.9
0.00 oh Mandor 19 L.10
AK-SNI 2008 S-113 1.00 m2 Cetakan beton / begisting memakai papan 167,250 0.8 .
0.02 m3 Usuk Kayu meranti 5/7 Kelas III 42,500 M.1055
0.02 m3 Papan cetakan 38,400 M.1088
0.40 kg Paku Biasa 2" - 5" 10,000 M.111
0.20 oh Pekerja 17,000 L.1
0.50 oh Tukang kayu 50,000 L.6
0.05 oh Kepala Tukang 7,500 L.9
0.01 oh Mandor 1,850 L.10
AK-SNI 2008 S-114 1.00 m2 Cetakan beton / begisting memakai multiplek 158,345 0.8 .
0.02 m3 Usuk Kayu meranti 5/7 Kelas III 42,500 M.1055
0.35 lbr Multiplek 29,495 M.1314
0.40 kg Paku Biasa 2" - 5" 10,000 M.111
0.20 oh Pekerja 17,000 L.1
0.50 oh Tukang kayu 50,000 L.6
0.05 oh Kepala Tukang 7,500 L.9
0.01 oh Mandor 1,850 L.10
AK-SNI 2008 S-115 1.00 m3 Membongkar cetakan 4,234,075 25.4 .

Software RAB Exarch xPro 125/396


4.00 oh Pekerja 340,000 L.1
0.70 m3 Perancah kayu 945,000 A.13
3.50 oh Pekerja 297,500 L.1
10.50 oh Tukang kayu 1,050,000 L.6
1.05 oh Kepala Tukang 157,500 L.9
0.18 oh Mandor 32,375 L.10
32.00 sewa-unit Scafolding 800,000 A.20
2.20 oh Pekerja 187,000 L.1
3.50 oh Tukang kayu 350,000 L.6
0.35 oh Kepala Tukang 52,500 L.9
0.12 oh Mandor 22,200 L.10
SNI-2002 S-116 1.00 m1 Pembuatan tiang pancang (40 x 40) cm, beton bertulang 953,878 1.8 .
0.02 m3 Pasir urug 3,800 M.10
0.09 m3 Pasir beton 23,500 M.8
0.15 m3 Batu pecah 2/3 52,500 M.1011
60.50 kg Semen 78,650 M.12
45.00 kg Besi beton 450,000 M.16
0.90 kg Kawat beton 21,150 M.27
0.03 m3 Kayu kruing 5/7 144,000 M.1049
0.12 kg Paku reng 1,980 M.1137
0.09 ltr Minyak bekisting 4,118 M.141
0.24 kg Plamir 2,880 M.11
1.00 oh Pekerja 85,000 L.1
0.67 oh Tukang batu 67,000 L.3
0.07 oh Kepala Tukang 10,050 L.9
0.05 oh Mandor 9,250 L.10
SNI-2002 S-117 1.00 m1 Pembuatan tiang pancang (35 x 35) cm, beton bertulang 756,018 1.4 .
0.02 m3 Pasir urug 3,200 M.10
0.08 m3 Pasir beton 20,000 M.8
0.13 m3 Batu pecah 2/3 43,750 M.1011
49.00 kg Semen 63,700 M.12
34.50 kg Besi beton 345,000 M.16
0.70 kg Kawat beton 16,450 M.27
0.03 m3 Kayu kruing 5/7 121,500 M.1049
0.12 kg Paku Biasa 2" - 5" 3,000 M.111
0.09 ltr Minyak bekisting 4,118 M.141
0.20 kg Plamir 2,400 M.11
0.80 oh Pekerja 68,000 L.1
0.50 oh Tukang batu 50,000 L.3
0.05 oh Kepala Tukang 7,500 L.9
0.04 oh Mandor 7,400 L.10
SNI-2007 S-118 1.00 m1 Memasang 1 m’ PVC Waterstop lebar 150 mm 91,005 0.1 .
1.05 m1 Waterstop lebar 150 mm 81,900 M.1541
0.06 oh Pekerja 5,100 L.1
0.03 oh Tukang batu 3,000 L.3
0.00 oh Kepala tukang 450 L.9
0.00 oh Mandor 555 L.10
SNI-2007 S-119 1.00 m1 Memasang PVC Waterstop lebar 200 mm 93,245 0.1 .
1.05 m1 Waterstop lebar 150 mm 81,900 M.1541
0.07 oh Pekerja 5,950 L.1
0.04 oh Tukang batu 3,500 L.3
0.00 oh Kepala tukang 600 L.9
0.01 oh Mandor 1,295 L.10
SNI-2007 S-120 1.00 m1 Membuat PVC Waterstop lebar 230 mm – 320 mm 94,040 0.1 .
1.05 m1 Waterstop lebar 150 mm 81,900 M.1541
0.08 oh Pekerja 6,800 L.1
0.04 oh Tukang batu 4,000 L.3
0.00 oh Kepala tukang 600 L.9
0.00 oh Mandor 740 L.10
AK-SNI 2008 S-121 1.00 m1 Cor beton kerb ( 15 x 30 ) cm 57,779 0.2 .
15.30 kg Semen 19,890 M.12
0.02 m3 Pasir pasang 6,197 M.9

Software RAB Exarch xPro 126/396


0.04 m3 Kerikil 8,118 M.7
0.00 m3 Papan cetakan 4,320 M.1088
0.03 kg Paku Biasa 2" - 5" 680 M.111
0.03 oh Tukang kayu 3,400 L.6
0.02 oh Tukang batu 1,580 L.3
0.01 oh Kepala tukang 750 L.9
0.14 oh Pekerja 11,679 L.1
0.01 oh Mandor 1,166 L.10
AK-SNI 2008 S-122 1.00 m1 Cor beton Devider ( 30 x 30 ) cm 104,337 0.3 .
30.60 kg Semen 39,780 M.12
0.05 m3 Pasir pasang 12,393 M.9
0.07 m3 Kerikil 16,236 M.7
0.00 m3 Papan cetakan 4,320 M.1088
0.03 kg Paku Biasa 2" - 5" 680 M.111
0.03 oh Tukang kayu 3,400 L.6
0.03 oh Tukang batu 3,150 L.3
0.01 oh Kepala tukang 990 L.9
0.25 oh Pekerja 21,242 L.1
0.01 oh Mandor 2,146 L.10
SNI-2007 S-123 1.00 m2 Memasang plesteran 1 PC : 1 PP, tebal 15 mm 69,760 0.5 .
15.50 kg Semen 20,155 M.12
0.02 m3 Pasir pasang 4,080 M.9
0.30 oh Pekerja 25,500 L.1
0.15 oh Tukang batu 15,000 L.3
0.02 oh Kepala tukang 2,250 L.9
0.02 oh Mandor 2,775 L.10
SNI-2007 S-124 1.00 m2 Memasang plesteran 1 PC : 2 PP, tebal 15 mm 63,916 0.5 .
10.22 kg Semen 13,291 M.12
0.02 m3 Pasir pasang 5,100 M.9
0.30 oh Pekerja 25,500 L.1
0.15 oh Tukang batu 15,000 L.3
0.02 oh Kepala tukang 2,250 L.9
0.02 oh Mandor 2,775 L.10
SNI-2007 S-125 1.00 m2 Memasang plesteran 1 PC : 3 PP, tebal 15 mm 61,499 0.5 .
7.78 kg Semen 10,109 M.12
0.02 m3 Pasir pasang 5,865 M.9
0.30 oh Pekerja 25,500 L.1
0.15 oh Tukang batu 15,000 L.3
0.02 oh Kepala tukang 2,250 L.9
0.02 oh Mandor 2,775 L.10
SNI-2007 S-126 1.00 m2 Memasang plesteran 1 PC : 4 PP, tebal 15 mm 59,757 0.5 .
6.24 kg Semen 8,112 M.12
0.02 m3 Pasir pasang 6,120 M.9
0.30 oh Pekerja 25,500 L.1
0.15 oh Tukang batu 15,000 L.3
0.02 oh Kepala tukang 2,250 L.9
0.02 oh Mandor 2,775 L.10
SNI-2007 S-127 1.00 m2 Memasang plesteran 1 PC : 5 PP, tebal 15 mm 58,894 0.5 .
5.18 kg Semen 6,739 M.12
0.03 m3 Pasir pasang 6,630 M.9
0.30 oh Pekerja 25,500 L.1
0.15 oh Tukang batu 15,000 L.3
0.02 oh Kepala tukang 2,250 L.9
0.02 oh Mandor 2,775 L.10
SNI-2007 S-128 1.00 m2 Memasang plesteran 1 PC : 6 PP, tebal 15 mm 58,151 0.5 .
4.42 kg Semen 5,741 M.12
0.03 m3 Pasir pasang 6,885 M.9
0.30 oh Pekerja 25,500 L.1
0.15 oh Tukang batu 15,000 L.3
0.02 oh Kepala tukang 2,250 L.9
0.02 oh Mandor 2,775 L.10
SNI-2007 S-129 1.00 m2 Memasang plesteran 1 PC : 7 PP, tebal 15 mm 57,782 0.5 .

Software RAB Exarch xPro 127/396


3.94 kg Semen 5,117 M.12
0.03 m3 Pasir pasang 7,140 M.9
0.30 oh Pekerja 25,500 L.1
0.15 oh Tukang batu 15,000 L.3
0.02 oh Kepala tukang 2,250 L.9
0.02 oh Mandor 2,775 L.10
SNI-2007 S-130 1.00 m2 Memasang plesteran 1 PC : 8 PP, tebal 15 mm 57,413 0.5 .
3.46 kg Semen 4,493 M.12
0.03 m3 Pasir pasang 7,395 M.9
0.30 oh Pekerja 25,500 L.1
0.15 oh Tukang batu 15,000 L.3
0.02 oh Kepala tukang 2,250 L.9
0.02 oh Mandor 2,775 L.10
SNI-2007 S-131 1.00 m2 Memasang plesteran 1 PC : 1/2 KP : 3 PP, tebal 15 mm 58,780 0.5 .
5.76 kg Semen 7,488 M.12
0.00 m3 Kapur padam 247 M.1014
0.01 m3 Pasir pasang 3,315 M.9
0.36 oh Pekerja 30,600 L.1
0.12 oh Tukang batu 12,000 L.3
0.01 oh Kepala tukang 1,800 L.9
0.02 oh Mandor 3,330 L.10
SNI-2007 S-132 1.00 m2 Memasang plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm 57,142 0.5 .
3.00 kg Semen 3,900 M.12
0.01 m3 Kapur padam 412 M.1014
0.02 m3 Pasir pasang 5,100 M.9
0.36 oh Pekerja 30,600 L.1
0.12 oh Tukang batu 12,000 L.3
0.01 oh Kepala tukang 1,800 L.9
0.02 oh Mandor 3,330 L.10
SNI-2007 S-133 1.00 m2 Memasang plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm 50,901 0.5 .
0.01 m3 Semen Warna 135 M.13
0.01 m3 Kapur padam 741 M.1014
0.01 m3 Pasir pasang 2,295 M.9
0.36 oh Pekerja 30,600 L.1
0.12 oh Tukang batu 12,000 L.3
0.01 oh Kepala tukang 1,800 L.9
0.02 oh Mandor 3,330 L.10
SNI-2007 S-134 1.00 m2 Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm 52,236 0.5 .
0.01 m3 Semen Warna 105 M.13
0.01 m3 Kapur padam 576 M.1014
0.02 m3 Pasir pasang 3,825 M.9
0.36 oh Pekerja 30,600 L.1
0.12 oh Tukang batu 12,000 L.3
0.01 oh Kepala tukang 1,800 L.9
0.02 oh Mandor 3,330 L.10
SNI-2002 S-135 1.00 m2 Plesteran 1 Pc : 3 Kp : 10 Ps, tebal 15 mm 56,632 0.5 .
1.84 kg Semen 2,392 M.12
0.01 m3 Kapur Pasang 2,940 M.1015
0.01 m3 Pasir pasang 3,570 M.9
0.36 oh Pekerja 30,600 L.1
0.12 oh Tukang batu 12,000 L.3
0.01 oh Kepala Tukang 1,800 L.9
0.02 oh Mandor 3,330 L.10
SNI-2007 S-136 1.00 m2 Memasang plesteran 1 PC : 2 PP, tebal 20 mm 85,677 0.6 .
13.63 kg Semen 17,722 M.12
0.03 m3 Pasir pasang 6,885 M.9
0.40 oh Pekerja 34,000 L.1
0.20 oh Tukang batu 20,000 L.3
0.02 oh Kepala tukang 3,000 L.9
0.02 oh Mandor 4,070 L.10
SNI-2007 S-137 1.00 m2 Memasang plesteran 1 PC : 3 PP, tebal 20 mm 68,888 0.5 .
10.37 kg Semen 13,478 M.12

Software RAB Exarch xPro 128/396


0.03 m3 Pasir pasang 7,905 M.9
0.26 oh Pekerja 22,100 L.1
0.20 oh Tukang batu 20,000 L.3
0.02 oh Kepala tukang 3,000 L.9
0.01 oh Mandor 2,405 L.10
SNI-2007 S-138 1.00 m2 Memasang plesteran 1 PC : 4 PP, tebal 20 mm 80,046 0.6 .
8.32 kg Semen 10,816 M.12
0.03 m3 Pasir pasang 8,160 M.9
0.40 oh Pekerja 34,000 L.1
0.20 oh Tukang batu 20,000 L.3
0.02 oh Kepala tukang 3,000 L.9
0.02 oh Mandor 4,070 L.10
SNI-2007 S-139 1.00 m2 Memasang plesteran 1 PC : 5 PP, tebal 20 mm 78,981 0.6 .
6.91 kg Semen 8,986 M.12
0.04 m3 Pasir pasang 8,925 M.9
0.40 oh Pekerja 34,000 L.1
0.20 oh Tukang batu 20,000 L.3
0.02 oh Kepala tukang 3,000 L.9
0.02 oh Mandor 4,070 L.10
SNI-2007 S-140 1.00 m2 Memasang plesteran 1 PC : 6 PP, tebal 20 mm 77,904 0.6 .
5.89 kg Semen 7,654 M.12
0.04 m3 Pasir pasang 9,180 M.9
0.40 oh Pekerja 34,000 L.1
0.20 oh Tukang batu 20,000 L.3
0.02 oh Kepala tukang 3,000 L.9
0.02 oh Mandor 4,070 L.10
SNI-2007 S-141 1.00 m2 Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm 72,236 0.7 .
0.01 m3 Semen Warna 135 M.13
0.01 m3 Kapur padam 741 M.1014
0.02 m3 Pasir pasang 4,590 M.9
0.44 oh Pekerja 37,400 L.1
0.22 oh Tukang batu 22,000 L.3
0.02 oh Kepala tukang 3,300 L.9
0.02 oh Mandor 4,070 L.10
SNI-2007 S-142 1.00 m2 Memasang Berapen 1 PC : 5 PP, tebal 15 mm 36,299 0.2 .
5.18 kg Semen 6,739 M.12
0.03 m3 Pasir pasang 6,630 M.9
0.15 oh Pekerja 12,750 L.1
0.08 oh Tukang batu 7,500 L.3
0.01 oh Kepala tukang 1,200 L.9
0.01 oh Mandor 1,480 L.10
SNI-2002 S-143 1.00 m1 Plesteran skoneng 1 Pc : 2 Ps ( untuk gedung ) 15,875 0.1 .
0.50 kg Semen 650 M.12
0.00 m3 Pasir pasang 510 M.9
0.06 oh Pekerja 4,845 L.1
0.04 oh Tukang batu 3,800 L.3
0.04 oh Kepala Tukang 5,700 L.9
0.00 oh Mandor 370 L.10
AK-SNI 2008 S-144 1.00 m1 Sponengan (untuk saluran dan sejenisnya) 12,620 0.1 .
0.36 kg Semen 468 M.12
0.00 m3 Pasir pasang 219 M.9
0.09 oh Pekerja 7,650 L.1
0.03 oh Tukang batu 3,000 L.3
0.00 oh Kepala Tukang 450 L.9
0.00 oh Mandor 833 L.10
SNI-2007 S-145 1.00 m2 Memasang Plesteran Granit , 1 PC : 2 Granit, tebal 10 m 306,455 0.7 .
10.00 kg Semen 13,000 M.12
15.00 kg Batu granit 225,000 M.1008
0.45 oh Pekerja 38,250 L.1
0.23 oh Tukang batu 22,500 L.3
0.02 oh Kepala tukang 3,450 L.9
0.02 oh Mandor 4,255 L.10

Software RAB Exarch xPro 129/396


SNI-2007 S-146 1.00 m2 Memasang Plesteran Teraso , 1 PC : 2 Batu Teraso, teba 117,455 0.7 .
10.00 kg Semen 13,000 M.12
15.00 kg Batu teraso 36,000 M.1012
0.45 oh Pekerja 38,250 L.1
0.23 oh Tukang batu 22,500 L.3
0.02 oh Kepala tukang 3,450 L.9
0.02 oh Mandor 4,255 L.10
SNI-2007 S-147 1.00 m2 Memasang Plesteran Ciprat 1 PC : 2 PP 46,921 0.4 .
4.32 kg Semen 5,616 M.12
0.01 m3 Pasir pasang 1,530 M.9
0.30 oh Pekerja 25,500 L.1
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala tukang 1,500 L.9
0.02 oh Mandor 2,775 L.10
SNI-2007 S-148 1.00 m2 Memasang finishing siar pasangan dinding bata merah (= 26,970 0.2 .
3.11 kg Semen 4,040 M.12
0.15 oh Pekerja 12,750 L.1
0.08 oh Tukang batu 7,500 L.3
0.01 oh Kepala tukang 1,200 L.9
0.01 oh Mandor 1,480 L.10
SNI-2007 S-149 1.00 m2 Memasang finishing siar pasangan dinding conblock eksp 12,870 0.1 .
1.60 kg Semen 2,080 M.12
0.07 oh Pekerja 5,950 L.1
0.04 oh Tukang batu 3,500 L.3
0.00 oh Kepala tukang 600 L.9
0.00 oh Mandor 740 L.10
SNI-2002 S-150 1.00 m2 Plesteran siar adukan 1 Pc : 2 Ps 31,976 0.2 .
4.32 kg Semen 5,616 M.12
0.02 m3 Pasir pasang 4,080 M.9
0.15 oh Pekerja 12,750 L.1
0.07 oh Tukang batu 7,000 L.3
0.01 oh Kepala Tukang 1,050 L.9
0.01 oh Mandor 1,480 L.10
SNI-2007 S-151 1.00 m2 Memasang acian 34,575 0.3 .
3.25 kg Semen 4,225 M.12
0.20 oh Pekerja 17,000 L.1
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala tukang 1,500 L.9
0.01 oh Mandor 1,850 L.10
SNI-2002 S-152 1.00 m2 Plesteran beton 1 Pc : 3 Ps, tebal 15 mm 62,051 0.5 .
7.07 kg Semen 9,191 M.12
0.02 m3 Pasir pasang 5,355 M.9
0.26 oh Pekerja 22,100 L.1
0.20 oh Tukang batu 20,000 L.3
0.02 oh Kepala Tukang 3,000 L.9
0.01 oh Mandor 2,405 L.10
AK-SNI 2008 S-153 1.00 m2 Plesteran batu kali 1pc:1/2kp:5ps tebal 10 mm 71,484 0.6 .
5.10 kg Semen 6,630 M.12
0.00 m3 Kapur pasang 686 M.1015
0.01 m3 Pasir pasang 3,468 M.9
0.40 oh Pekerja 34,000 L.1
0.20 oh Tukang batu 20,000 L.3
0.02 oh Kepala Tukang 3,000 L.9
0.02 oh Mandor 3,700 L.10
AK-SNI 2008 S-154 1.00 m2 Plesteran batu kali 1pc:3ps 76,255 0.6 .
8.16 kg Semen 10,608 M.12
0.02 m3 Pasir pasang 4,947 M.9
0.40 oh Pekerja 34,000 L.1
0.20 oh Tukang batu 20,000 L.3
0.02 oh Kepala Tukang 3,000 L.9
0.02 oh Mandor 3,700 L.10
AK-SNI 2008 S-155 1.00 m2 Plesteran batu kali 1pc:4ps 74,494 0.6 .

Software RAB Exarch xPro 130/396


6.51 kg Semen 8,464 M.12
0.02 m3 Pasir pasang 5,330 M.9
0.40 oh Pekerja 34,000 L.1
0.20 oh Tukang batu 20,000 L.3
0.02 oh Kepala Tukang 3,000 L.9
0.02 oh Mandor 3,700 L.10
AK-SNI 2008 S-156 1.00 m2 Plesteran K- 50, tebal 20 mm 76,736 0.6 .
11.12 kg Semen 14,456 M.12
0.03 m3 Pasir pasang 7,650 M.9
0.36 oh Pekerja 30,600 L.1
0.18 oh Tukang batu 18,000 L.3
0.02 oh Kepala Tukang 2,700 L.9
0.02 oh Mandor 3,330 L.10
SNI-2007 S-157 1.00 m2 Memasang lantai ubin PC abu-abu ukuran (40 x 40) cm 99,448 0.4 .
1.06 m2 Ubin abu-abu 37,128 M.1401
9.80 kg Semen 12,740 M.12
0.05 m3 Pasir pasang 11,475 M.9
0.25 oh Pekerja 21,250 L.1
0.13 oh Tukang batu 12,500 L.3
0.01 oh Kepala tukang 1,950 L.9
0.01 oh Mandor 2,405 L.10
SNI-2007 S-158 1.00 m2 Memasang lantai ubin PC abu-abu ukuran (30 x 30) cm 101,321 0.4 .
1.07 m2 Ubin abu-abu 37,391 M.1401
10.00 kg Semen 13,000 M.12
0.05 m3 Pasir pasang 11,475 M.9
0.26 oh Pekerja 22,100 L.1
0.13 oh Tukang batu 13,000 L.3
0.01 oh Kepala tukang 1,950 L.9
0.01 oh Mandor 2,405 L.10
SNI-2007 S-159 1.00 m2 Memasang lantai ubin PC abu-abu ukuran (20 x 20) cm 103,235 0.4 .
1.06 m2 Ubin abu-abu 37,100 M.1401
10.40 kg Semen 13,520 M.12
0.05 m3 Pasir pasang 11,475 M.9
0.27 oh Pekerja 22,950 L.1
0.14 oh Tukang batu 13,500 L.3
0.01 oh Kepala tukang 2,100 L.9
0.01 oh Mandor 2,590 L.10
SNI-2007 S-160 1.00 m2 Memasang lantai ubin warna ukuran (40 x 40) cm 198,508 0.4 .
1.06 m2 Ubin warna 116,688 M.1421
9.80 kg Semen 12,740 M.12
0.05 m3 Pasir pasang 11,475 M.9
1.30 kg Semen warna 19,500 M.13
0.25 oh Pekerja 21,250 L.1
0.13 oh Tukang batu 12,500 L.3
0.01 oh Kepala tukang 1,950 L.9
0.01 oh Mandor 2,405 L.10
SNI-2007 S-161 1.00 m2 Memasang lantai ubin warna ukuran (30 x 30) cm 203,943 0.4 .
1.07 m2 Ubin warna 117,513 M.1421
10.00 kg Semen 13,000 M.12
0.05 m3 Pasir pasang 11,475 M.9
1.50 kg Semen warna 22,500 M.13
0.26 oh Pekerja 22,100 L.1
0.13 oh Tukang batu 13,000 L.3
0.01 oh Kepala tukang 1,950 L.9
0.01 oh Mandor 2,405 L.10
SNI-2007 S-162 1.00 m2 Memasang lantai ubin warna ukuran (20 x 20) cm 207,035 0.4 .
1.06 m2 Ubin warna 116,600 M.1421
10.40 kg Semen 13,520 M.12
0.05 m3 Pasir pasang 11,475 M.9
1.62 kg Semen warna 24,300 M.13
0.27 oh Pekerja 22,950 L.1
0.14 oh Tukang batu 13,500 L.3

Software RAB Exarch xPro 131/396


0.01 oh Kepala tukang 2,100 L.9
0.01 oh Mandor 2,590 L.10
SNI-2007 S-163 1.00 m2 Memasang lantai ubin teraso ukuran (40 x 40) cm 235,636 0.4 .
1.06 m2 Ubin teraso 153,816 M.1418
9.80 kg Semen 12,740 M.12
0.05 m3 Pasir pasang 11,475 M.9
1.30 kg Semen warna 19,500 M.13
0.25 oh Pekerja 21,250 L.1
0.13 oh Tukang batu 12,500 L.3
0.01 oh Kepala tukang 1,950 L.9
0.01 oh Mandor 2,405 L.10
SNI-2007 S-164 1.00 m2 Memasang lantai ubin teraso ukuran (30 x 30) cm 241,334 0.4 .
1.07 m2 Ubin teraso 154,904 M.1418
10.00 kg Semen 13,000 M.12
0.05 m3 Pasir pasang 11,475 M.9
1.50 kg Semen warna 22,500 M.13
0.26 oh Pekerja 22,100 L.1
0.13 oh Tukang batu 13,000 L.3
0.01 oh Kepala tukang 1,950 L.9
0.01 oh Mandor 2,405 L.10
SNI-2007 S-165 1.00 m2 Memasang lantai ubin granit ukuran (40 x 40) cm 384,148 0.4 .
1.06 m2 Ubin granit 302,328 M.1402
9.80 kg Semen 12,740 M.12
0.05 m3 Pasir pasang 11,475 M.9
1.30 kg Semen warna 19,500 M.13
0.25 oh Pekerja 21,250 L.1
0.13 oh Tukang batu 12,500 L.3
0.01 oh Kepala tukang 1,950 L.9
0.01 oh Mandor 2,405 L.10
SNI-2007 S-166 1.00 m2 Memasang lantai ubin granit ukuran (30 x 30) cm 390,896 0.4 .
1.07 m2 Ubin granit 304,466 M.1402
10.00 kg Semen 13,000 M.12
0.05 m3 Pasir pasang 11,475 M.9
1.50 kg Semen warna 22,500 M.13
0.26 oh Pekerja 22,100 L.1
0.13 oh Tukang batu 13,000 L.3
0.01 oh Kepala tukang 1,950 L.9
0.01 oh Mandor 2,405 L.10
SNI-2007 S-167 1.00 m2 Memasang lantai ubin teralux ukuran (40 x 40) cm 164,562 0.4 .
1.06 m2 Ubin teralux kerang 82,742 M.1413
9.80 kg Semen 12,740 M.12
0.05 m3 Pasir pasang 11,475 M.9
1.30 kg Semen warna 19,500 M.13
0.25 oh Pekerja 21,250 L.1
0.13 oh Tukang batu 12,500 L.3
0.01 oh Kepala tukang 1,950 L.9
0.01 oh Mandor 2,405 L.10
SNI-2007 S-168 1.00 m2 Memasang lantai ubin teralux ukuran (30 x 30) cm 169,757 0.4 .
1.07 m2 Ubin teralux kerang 83,327 M.1413
10.00 kg Semen 13,000 M.12
0.05 m3 Pasir pasang 11,475 M.9
1.50 kg Semen warna 22,500 M.13
0.26 oh Pekerja 22,100 L.1
0.13 oh Tukang batu 13,000 L.3
0.01 oh Kepala tukang 1,950 L.9
0.01 oh Mandor 2,405 L.10
SNI-2007 S-169 1.00 m2 Memasang lantai ubin teralux marmer ukuran (60 x 60) 405,399 0.4 .
1.12 m2 Ubin teralux marmer 322,524 M.1414
9.60 kg Semen 12,480 M.12
0.05 m3 Pasir pasang 11,475 M.9
1.50 kg Semen warna 22,500 M.13
0.24 oh Pekerja 20,400 L.1

Software RAB Exarch xPro 132/396


0.12 oh Tukang batu 12,000 L.3
0.01 oh Kepala tukang 1,800 L.9
0.01 oh Mandor 2,220 L.10
SNI-2007 S-170 1.00 m2 Memasang lantai ubin teralux marmer ukuran (40 x 40) 388,391 0.4 .
1.06 m2 Ubin teralux marmer 306,571 M.1414
9.80 kg Semen 12,740 M.12
0.05 m3 Pasir pasang 11,475 M.9
1.30 kg Semen warna 19,500 M.13
0.25 oh Pekerja 21,250 L.1
0.13 oh Tukang batu 12,500 L.3
0.01 oh Kepala tukang 1,950 L.9
0.01 oh Mandor 2,405 L.10
SNI-2007 S-171 1.00 m2 Memasang lantai ubin teralux marmer ukuran (30 x 30) 395,169 0.4 .
1.07 m2 Ubin teralux marmer 308,739 M.1414
10.00 kg Semen 13,000 M.12
0.05 m3 Pasir pasang 11,475 M.9
1.50 kg Semen warna 22,500 M.13
0.26 oh Pekerja 22,100 L.1
0.13 oh Tukang batu 13,000 L.3
0.01 oh Kepala tukang 1,950 L.9
0.01 oh Mandor 2,405 L.10
SNI-2007 S-172 1.00 m1 Memasang plint ubin PC abu-abu ukuran (15 x 20) cm 40,640 0.2 .
5.30 bh Plint Ubin 18,550 M.1371
1.65 kg Semen 2,145 M.12
0.00 m3 Pasir pasang 1,020 M.9
0.09 oh Pekerja 7,650 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala tukang 1,350 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-173 1.00 m1 Memasang plint ubin PC abu-abu ukuran (10 x 30) cm 33,657 0.2 .
3.53 bh Plint Ubin 12,355 M.1371
1.24 kg Semen 1,612 M.12
0.00 m3 Pasir pasang 765 M.9
0.09 oh Pekerja 7,650 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala tukang 1,350 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-174 1.00 m1 Memasang plint ubin PC abu-abu ukuran (10 x 40) cm 30,577 0.2 .
2.65 bh Plint Ubin 9,275 M.1371
1.24 kg Semen 1,612 M.12
0.00 m3 Pasir pasang 765 M.9
0.09 oh Pekerja 7,650 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala tukang 1,350 L.9
0.01 oh Mandor 925 L.10
SNI-2002 S-175 1.00 m1 Pasang plint ubin PC abu-abu ukuran 10 x 20 cm 51,398 0.2 .
5.30 bh Plint keramik ukuran 10cm x 10cm 29,680 M.1368
1.56 kg Semen 2,028 M.12
0.00 m3 Pasir pasang 765 M.9
0.09 oh Pekerja 7,650 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala Tukang 1,350 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-176 1.00 m1 Memasang plint ubin PC warna ukuran (10 x 20) cm 51,822 0.2 .
5.30 bh Plint ubin PC warna 29,150 M.1380
1.14 kg Semen 1,482 M.12
0.00 m3 Pasir pasang 765 M.9
0.10 kg Semen warna 1,500 M.13
0.09 oh Pekerja 7,650 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala tukang 1,350 L.9
0.01 oh Mandor 925 L.10

Software RAB Exarch xPro 133/396


SNI-2007 S-177 1.00 m1 Memasang plint ubin PC warna ukuran (10 x 30) cm 42,087 0.2 .
3.53 bh Plint ubin PC warna 19,415 M.1380
1.14 kg Semen 1,482 M.12
0.00 m3 Pasir pasang 765 M.9
0.10 kg Semen warna 1,500 M.13
0.09 oh Pekerja 7,650 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala tukang 1,350 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-178 1.00 m1 Memasang plint ubin PC warna ukuran (10 x 40) cm 37,247 0.2 .
2.65 bh Plint ubin PC warna 14,575 M.1380
1.14 kg Semen 1,482 M.12
0.00 m3 Pasir pasang 765 M.9
0.10 kg Semen warna 1,500 M.13
0.09 oh Pekerja 7,650 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala tukang 1,350 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-179 1.00 m1 Memasang plint ubin teraso ukuran (10 x 30) cm 38,910 0.2 .
3.53 bh Plint ubin teraso 16,238 M.1388
1.14 kg Semen 1,482 M.12
0.00 m3 Pasir pasang 765 M.9
0.10 kg Semen warna 1,500 M.13
0.09 oh Pekerja 7,650 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala tukang 1,350 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-180 1.00 m1 Memasang plint ubin teraso ukuran (10 x 40) cm 34,862 0.2 .
2.65 bh Plint ubin teraso 12,190 M.1388
1.14 kg Semen 1,482 M.12
0.00 m3 Pasir pasang 765 M.9
0.10 kg Semen warna 1,500 M.13
0.09 oh Pekerja 7,650 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala tukang 1,350 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-181 1.00 m1 Memasang plint ubin granit ukuran (10 x 40) cm 54,472 0.2 .
2.65 bh Plint ubin granit 31,800 M.1372
1.14 kg Semen 1,482 M.12
0.00 m3 Pasir pasang 765 M.9
0.10 kg Semen warna 1,500 M.13
0.09 oh Pekerja 7,650 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala tukang 1,350 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-182 1.00 m1 Memasang plint ubin granit ukuran (10 x 30) cm 65,032 0.2 .
3.53 bh Plint ubin granit 42,360 M.1372
1.14 kg Semen 1,482 M.12
0.00 m3 Pasir pasang 765 M.9
0.10 kg Semen warna 1,500 M.13
0.09 oh Pekerja 7,650 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala tukang 1,350 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-183 1.00 m1 Memasang plint ubin teralux kerang ukuran (10 x 40) cm 38,572 0.2 .
2.65 bh Plint ubin teralux kerang 15,900 M.1381
1.14 kg Semen 1,482 M.12
0.00 m3 Pasir pasang 765 M.9
0.10 kg Semen warna 1,500 M.13
0.09 oh Pekerja 7,650 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala tukang 1,350 L.9

Software RAB Exarch xPro 134/396


0.01 oh Mandor 925 L.10
SNI-2007 S-184 1.00 m1 Memasang plint ubin teralux kerang ukuran (10 x 30) cm 43,852 0.2 .
3.53 bh Plint ubin teralux kerang 21,180 M.1381
1.14 kg Semen 1,482 M.12
0.00 m3 Pasir pasang 765 M.9
0.10 kg Semen warna 1,500 M.13
0.09 oh Pekerja 7,650 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala tukang 1,350 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-185 1.00 m1 Memasang plint ubin teralux marmer ukuran (10 x 60) c 44,772 0.2 .
1.70 bh Plint ubin teralux marmer 22,100 M.1384
1.14 kg Semen 1,482 M.12
0.00 m3 Pasir pasang 765 M.9
0.10 kg Semen warna 1,500 M.13
0.09 oh Pekerja 7,650 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala tukang 1,350 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-186 1.00 m1 Memasang plint ubin teralux marmer ukuran (10 x 40) c 57,122 0.2 .
2.65 bh Plint ubin teralux marmer 34,450 M.1384
1.14 kg Semen 1,482 M.12
0.00 m3 Pasir pasang 765 M.9
0.10 kg Semen warna 1,500 M.13
0.09 oh Pekerja 7,650 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala tukang 1,350 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-187 1.00 m1 Memasang plint ubin teralux marmer ukuran (10 x 30) c 68,562 0.2 .
3.53 bh Plint ubin teralux marmer 45,890 M.1384
1.14 kg Semen 1,482 M.12
0.00 m3 Pasir pasang 765 M.9
0.10 kg Semen warna 1,500 M.13
0.09 oh Pekerja 7,650 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala tukang 1,350 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-188 1.00 m2 Memasang lantai teraso cor ditempat, tebal 3 cm 89,910 0.6 .
0.04 m3 Bahan teraso cor 35,280 M.1473
0.36 oh Pekerja 30,600 L.1
0.18 oh Tukang batu 18,000 L.3
0.02 oh Kepala tukang 2,700 L.9
0.02 oh Mandor 3,330 L.10
SNI-2007 S-189 1.00 m2 Memasang lantai keramik artistik ukuran (10 x 20) cm 228,957 1.1 .
1.06 m2 Ubin keramik artistik 59,360 M.1406
8.19 kg Semen 10,647 M.12
0.05 m3 Pasir pasang 11,475 M.9
2.75 kg Semen warna 41,250 M.13
0.70 oh Pekerja 59,500 L.1
0.35 oh Tukang batu 35,000 L.3
0.04 oh Kepala tukang 5,250 L.9
0.04 oh Mandor 6,475 L.10
SNI-2007 S-190 1.00 m2 Memasang lantai keramik artistik ukuran (10 x 10) cm ata 235,707 1.1 .
1.06 m2 Ubin keramik artistik 59,360 M.1406
8.19 kg Semen 10,647 M.12
0.05 m3 Pasir pasang 11,475 M.9
3.20 kg Semen warna 48,000 M.13
0.70 oh Pekerja 59,500 L.1
0.35 oh Tukang batu 35,000 L.3
0.04 oh Kepala tukang 5,250 L.9
0.04 oh Mandor 6,475 L.10
SNI-2007 S-191 1.00 m2 Memasang lantai keramik ukuran (33 x 33) cm 168,982 1.1 .

Software RAB Exarch xPro 135/396


1.09 m2 Ubin keramik 16,335 M.1405
8.19 kg Semen 10,647 M.12
0.05 m3 Pasir pasang 11,475 M.9
1.62 kg Semen warna 24,300 M.13
0.70 oh Pekerja 59,500 L.1
0.35 oh Tukang batu 35,000 L.3
0.04 oh Kepala tukang 5,250 L.9
0.04 oh Mandor 6,475 L.10
SNI-2007 S-192 1.00 m2 Memasang lantai keramik ukuran (30 x 30) cm 169,220 1.1 .
1.07 m2 Ubin keramik 16,020 M.1405
10.00 kg Semen 13,000 M.12
0.05 m3 Pasir pasang 11,475 M.9
1.50 kg Semen warna 22,500 M.13
0.70 oh Pekerja 59,500 L.1
0.35 oh Tukang batu 35,000 L.3
0.04 oh Kepala tukang 5,250 L.9
0.04 oh Mandor 6,475 L.10
SNI-2007 S-193 1.00 m2 Memasang lantai keramik ukuran (20 x 20) cm 171,420 1.1 .
1.06 m2 Ubin keramik 15,900 M.1405
10.40 kg Semen 13,520 M.12
0.05 m3 Pasir pasang 11,475 M.9
1.62 kg Semen warna 24,300 M.13
0.70 oh Pekerja 59,500 L.1
0.35 oh Tukang batu 35,000 L.3
0.04 oh Kepala tukang 5,250 L.9
0.04 oh Mandor 6,475 L.10
SNI-2007 S-194 1.00 m2 Memasang lantai keramik ukuran (10 x 33) cm, variasi/b 265,605 1.7 .
1.09 m2 Ubin keramik 16,335 M.1405
9.80 kg Semen 12,740 M.12
0.05 m3 Pasir pasang 11,475 M.9
4.37 kg Semen warna 65,550 M.13
1.05 oh Pekerja 89,250 L.1
0.53 oh Tukang batu 52,500 L.3
0.05 oh Kepala tukang 7,950 L.9
0.05 oh Mandor 9,805 L.10
SNI-2007 S-195 1.00 m2 Memasang lantai mosaik ukuran (30 x 30) cm, campuran s 388,908 1.1 .
1.07 m2 Mosaik 224,343 M.1365
14.15 kg Semen 18,395 M.12
0.04 m3 Pasir pasang 9,945 M.9
2.00 kg Semen warna 30,000 M.13
0.70 oh Pekerja 59,500 L.1
0.35 oh Tukang batu 35,000 L.3
0.04 oh Kepala tukang 5,250 L.9
0.04 oh Mandor 6,475 L.10
SNI-2007 S-196 1.00 m1 Memasang plint keramik artisitk ukuran (10 x 20) cm 79,847 0.2 .
5.30 bh Plint keramik artistik 58,300 M.1367
1.14 kg Semen 1,482 M.12
0.00 m3 Pasir pasang 765 M.9
0.03 kg Semen warna 375 M.13
0.09 oh Pekerja 7,650 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala tukang 1,350 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-197 1.00 m1 Memasang plint keramik artisitik ukuran (10 x 10) cm 138,522 0.2 .
10.60 bh Plint keramik artistik 116,600 M.1367
1.14 kg Semen 1,482 M.12
0.00 m3 Pasir pasang 765 M.9
0.05 kg Semen warna 750 M.13
0.09 oh Pekerja 7,650 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala tukang 1,350 L.9
0.01 oh Mandor 925 L.10

Software RAB Exarch xPro 136/396


SNI-2007 S-198 1.00 m1 Memasang plint keramik ukuran (5 x 20) cm 78,544 0.2 .
5.30 bh Plint keramik artistik 58,300 M.1367
0.57 kg Semen 741 M.12
0.00 m3 Pasir pasang 383 M.9
0.01 kg Semen warna 195 M.13
0.09 oh Pekerja 7,650 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala tukang 1,350 L.9
0.01 oh Mandor 925 L.10
SNI-2002 S-199 1.00 m1 Pasang plint keramik ukuran 10 x 40 cm 38,650 0.2 .
2.65 bh Plint ubin keramik 10 x 40 cm 15,900 M.1376
1.20 kg Semen 1,560 M.12
0.00 m3 Pasir pasang 765 M.9
0.10 kg Semen warna 1,500 M.13
0.09 oh Pekerja 7,650 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala Tukang 1,350 L.9
0.01 oh Mandor 925 L.10
SNI-2002 S-200 1.00 m1 Pasang plint keramik ukuran 10 x 30 cm 39,624 0.2 .
3.53 bh Plint ubin keramik 10 x 30 cm 16,238 M.1375
1.65 kg Semen 2,145 M.12
0.00 m3 Pasir pasang 816 M.9
0.10 kg Semen warna 1,500 M.13
0.09 oh Pekerja 7,650 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala Tukang 1,350 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-201 1.00 m1 Memasang plint internal cove artistik ukuran (5 x 5 x 20) 62,422 0.2 .
5.30 bh Internal cove 39,750 M.1527
1.14 kg Semen 1,482 M.12
0.00 m3 Pasir pasang 765 M.9
0.10 kg Semen warna 1,500 M.13
0.09 oh Pekerja 7,650 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala tukang 1,350 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-202 1.00 m2 Memasang lantai marmer ukuran (100 x 100) cm 615,097 1.1 .
1.06 m2 Marmer 477,000 M.1363
8.19 kg Semen 10,647 M.12
0.05 m3 Pasir pasang 11,475 M.9
0.65 kg Semen warna 9,750 M.13
0.70 oh Pekerja 59,500 L.1
0.35 oh Tukang batu 35,000 L.3
0.04 oh Kepala tukang 5,250 L.9
0.04 oh Mandor 6,475 L.10
SNI-2007 S-203 1.00 m2 Memasang lantai karpet 639,415 0.4 .
1.05 m2 Karpet 598,500 M.1312
0.35 kg Lem 5,250 M.1492
0.17 oh Pekerja 14,450 L.1
0.17 oh Tukang kayu 17,000 L.6
0.02 oh Kepala tukang 2,550 L.9
0.01 oh Mandor 1,665 L.10
SNI-2007 S-204 1.00 m2 Memasang underlayer 128,535 0.3 .
1.05 m2 Underlayer irubber corrugated 98,175 M.1539
0.35 kg Lem 5,250 M.1492
0.12 oh Pekerja 10,200 L.1
0.12 oh Tukang kayu 12,000 L.6
0.01 oh Kepala tukang 1,800 L.9
0.01 oh Mandor 1,110 L.10
SNI-2007 S-205 1.00 m2 Memasang lantai parquet 129,925 1.1 .
1.05 m2 Parquet kayu 14,700 M.1315
0.60 kg Lem 9,000 M.1492

Software RAB Exarch xPro 137/396


0.70 oh Pekerja 59,500 L.1
0.35 oh Tukang kayu 35,000 L.6
0.04 oh Kepala tukang 5,250 L.9
0.04 oh Mandor 6,475 L.10
SNI-2007 S-206 1.00 m2 Memasang lantai kayu (gym floor) 259,075 1.1 .
1.05 m2 Gymfloor 143,850 M.1310
0.60 kg Lem 9,000 M.1492
0.70 oh Pekerja 59,500 L.1
0.35 oh Tukang kayu 35,000 L.6
0.04 oh Kepala tukang 5,250 L.9
0.04 oh Mandor 6,475 L.10
SNI-2007 S-207 1.00 m2 Memasang dinding porselen ukuran (11 x 11) cm 332,140 1.6 .
1.05 m2 Porselen 141,210 M.1395
9.30 kg Semen 12,090 M.12
0.02 m3 Pasir pasang 4,590 M.9
1.50 kg Semen warna 22,500 M.13
1.00 oh Pekerja 85,000 L.1
0.50 oh Tukang batu 50,000 L.3
0.05 oh Kepala tukang 7,500 L.9
0.05 oh Mandor 9,250 L.10
SNI-2007 S-208 1.00 m2 Memasang dinding porselin ukuran (10 x 20) cm 337,605 1.4 .
1.06 m2 Porselen 143,100 M.1395
9.30 kg Semen 12,090 M.12
0.02 m3 Pasir pasang 4,590 M.9
2.75 kg Semen warna 41,250 M.13
0.90 oh Pekerja 76,500 L.1
0.45 oh Tukang batu 45,000 L.3
0.05 oh Kepala tukang 6,750 L.9
0.05 oh Mandor 8,325 L.10
SNI-2007 S-209 1.00 m2 Memasang dinding porselin ukuran (20 x 20) cm 325,455 1.4 .
1.06 m2 Porselen 143,100 M.1395
9.30 kg Semen 12,090 M.12
0.02 m3 Pasir pasang 4,590 M.9
1.94 kg Semen warna 29,100 M.13
0.90 oh Pekerja 76,500 L.1
0.45 oh Tukang batu 45,000 L.3
0.05 oh Kepala tukang 6,750 L.9
0.05 oh Mandor 8,325 L.10
SNI-2007 S-210 1.00 m2 Memasang dinding keramik ukuran (10 x 20) cm 274,005 1.4 .
1.06 m2 keramik artistik 10cm x 20cm 79,500 M.1354
9.30 kg Semen 12,090 M.12
0.02 m3 Pasir pasang 4,590 M.9
2.75 kg Semen warna 41,250 M.13
0.90 oh Pekerja 76,500 L.1
0.45 oh Tukang batu 45,000 L.3
0.05 oh Kepala tukang 6,750 L.9
0.05 oh Mandor 8,325 L.10
SNI-2007 S-211 1.00 m2 Memasang dinding marmer ukuran (100 x 100) cm 781,647 2.1 .
1.06 m2 Marmer 477,000 M.1363
3.00 bh Paku Biasa 2" - 5" 75,075 M.111
12.44 kg Semen 16,172 M.12
0.03 m3 Pasir pasang 6,375 M.9
0.65 kg Semen warna 9,750 M.13
1.30 oh Pekerja 110,500 L.1
0.65 oh Tukang batu 65,000 L.3
0.07 oh Kepala tukang 9,750 L.9
0.07 oh Mandor 12,025 L.10
SNI-2007 S-212 1.00 m2 Memasang dinding bata pelapis ukuran (3 x 7 x 24) cm 256,497 1.6 .
63.00 bh Bata merah 40,950 M.2
12.44 kg Semen 16,172 M.12
0.03 m3 Pasir pasang 6,375 M.9
2.75 kg Semen warna 41,250 M.13

Software RAB Exarch xPro 138/396


1.00 oh Pekerja 85,000 L.1
0.50 oh Tukang batu 50,000 L.3
0.05 oh Kepala tukang 7,500 L.9
0.05 oh Mandor 9,250 L.10
SNI-2007 S-213 1.00 m2 Memasang dinding batu paras 245,925 1.1 .
1.10 m2 Batu paras 115,500 M.1009
11.75 kg Semen 15,275 M.12
0.04 m3 Pasir pasang 8,925 M.9
0.70 oh Pekerja 59,500 L.1
0.35 oh Tukang batu 35,000 L.3
0.04 oh Kepala tukang 5,250 L.9
0.04 oh Mandor 6,475 L.10
SNI-2007 S-214 1.00 m2 Memasang dinding batu tempel hitam 333,925 1.1 .
1.10 m2 Batu alam / tempel 203,500 M.4
11.75 kg Semen 15,275 M.12
0.04 m3 Pasir pasang 8,925 M.9
0.70 oh Pekerja 59,500 L.1
0.35 oh Tukang batu 35,000 L.3
0.04 oh Kepala tukang 5,250 L.9
0.04 oh Mandor 6,475 L.10
SNI-2007 S-215 1.00 m2 Memasang lantai vinyl ukuran (30 x 30) cm KL I 260,449 0.3 .
11.87 m2 Vinyl 221,969 M.1351
0.35 kg Lem vinyl 7,000 M.1495
0.15 oh Pekerja 12,750 L.1
0.15 oh Tukang kayu 15,000 L.6
0.02 oh Kepala tukang 2,250 L.9
0.01 oh Mandor 1,480 L.10
SNI-2007 S-216 1.00 m2 Memasang wall paper, lebar 50 cm 141,452 0.5 .
2.20 m1 Wallpaper 77,000 M.1325
0.25 kg Lem 3,750 M.1492
0.35 oh Pekerja 29,750 L.1
0.18 oh Tukang Interior 28,032 L.13
0.02 oh Kepala tukang 2,550 L.9
0.00 oh Mandor 370 L.10
SNI-2007 S-217 1.00 m2 Memasang floor hardener 43,860 0.3 .
5.00 kg Floor hardener 18,750 M.1524
0.12 oh Pekerja 10,200 L.1
0.12 oh Tukang kayu 12,000 L.6
0.01 oh Kepala tukang 1,800 L.9
0.01 oh Mandor 1,110 L.10
SNI-2007 S-218 1.00 m1 Memasang plint kayu kelas II ukuran (2 x 10) cm 36,460 0.3 .
0.00 m3 Papan kayu kelas II 10,500 M.1096
0.05 kg Paku skrup 5 cm 850 M.1141
0.12 oh Pekerja 10,200 L.1
0.12 oh Tukang kayu 12,000 L.6
0.01 oh Kepala tukang 1,800 L.9
0.01 oh Mandor 1,110 L.10
AK-SNI 2008 S-219 1.00 m1 Pasang keramik stepnosing granito 7/30 55,672 0.2 .
3.60 bh Stepnosing granito 37,800 M.1400
0.41 kg Semen 530 M.12
0.00 m3 Pasir Pasang 230 M.9
0.06 kg Semen Warna 900 M.13
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala Tukang 1,500 L.9
0.05 oh Pekerja 4,250 L.1
0.00 oh Mandor 463 L.10
AK-SNI 2008 S-220 1.00 m1 Pasang list keramik dinding 5/20 77,872 0.2 .
5.00 bh List keramik dinding motif 60,000 M.1362
0.41 kg Semen 530 M.12
0.00 m3 Pasir pasang 230 M.9
0.06 kg Semen Warna 900 M.13
0.10 oh Tukang batu 10,000 L.3

Software RAB Exarch xPro 139/396


0.01 oh Kepala Tukang 1,500 L.9
0.05 oh Pekerja 4,250 L.1
0.00 oh Mandor 463 L.10
AK-SNI 2008 S-221 1.00 m1 Memasang hospital plint panjang 20 cm 85,147 0.2 .
5.30 bh Hospital plint 63,600 M.1352
1.14 kg Semen 1,482 M.12
0.00 m3 Pasir pasang 765 M.9
0.03 kg Semen warna 375 M.13
0.09 oh Pekerja 7,650 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala tukang 1,350 L.9
0.01 oh Mandor 925 L.10
AK-SNI 2008 S-222 1.00 m1 Memasang hospital plint panjang 30 cm 37,785 0.2 .
3.53 bh Plint ubin keramik 10 x 30 cm 16,238 M.1375
1.14 kg Semen 1,482 M.12
0.00 m3 Pasir pasang 765 M.9
0.03 kg Semen warna 375 M.13
0.09 oh Pekerja 7,650 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala Tukang 1,350 L.9
0.01 oh Mandor 925 L.10
AK-SNI 2008 S-223 1.00 m2 Pasang conblock tipe segi-empat, uni, segi-enam abu-abu 91,875 0.8 .
1.00 m2 Conblock 6,000 M.1476
0.05 m3 Pasir urug 10,000 M.10
0.50 oh Pekerja 42,500 L.1
0.25 oh Tukang batu 25,000 L.3
0.03 oh Kepala Tukang 3,750 L.9
0.03 oh Mandor 4,625 L.10
AK-SNI 2008 S-224 1.00 m2 Pasang conblock tipe uni, segi-empat abu-abu 8 cm, K-30 91,875 0.8 .
1.00 m2 Conblock 6,000 M.1476
0.05 m3 Pasir urug 10,000 M.10
0.50 oh Pekerja 42,500 L.1
0.25 oh Tukang batu 25,000 L.3
0.03 oh Kepala Tukang 3,750 L.9
0.03 oh Mandor 4,625 L.10
AK-SNI 2008 S-225 1.00 m2 Pasang conblock tipe segi-empat abu-abu 6 cm, K-200 91,875 0.8 .
1.00 m2 Conblock 6,000 M.1476
0.05 m3 Pasir urug 10,000 M.10
0.50 oh Pekerja 42,500 L.1
0.25 oh Tukang batu 25,000 L.3
0.03 oh Kepala Tukang 3,750 L.9
0.03 oh Mandor 4,625 L.10
AK-SNI 2008 S-226 1.00 m2 Pasang conblock tipe segi-empat abu-abu 8 cm, K-200 91,875 0.8 .
1.00 m2 Conblock 6,000 M.1476
0.05 m3 Pasir urug 10,000 M.10
0.50 oh Pekerja 42,500 L.1
0.25 oh Tukang batu 25,000 L.3
0.03 oh Kepala Tukang 3,750 L.9
0.03 oh Mandor 4,625 L.10
AK-SNI 2008 S-227 1.00 m2 Pasang conblock tipe segi-enam abu-abu 6 cm, K-200 91,875 0.8 .
1.00 m2 Conblock 6,000 M.1476
0.05 m3 Pasir urug 10,000 M.10
0.50 oh Pekerja 42,500 L.1
0.25 oh Tukang batu 25,000 L.3
0.03 oh Kepala Tukang 3,750 L.9
0.03 oh Mandor 4,625 L.10
AK-SNI 2008 S-228 1.00 m2 Pasang conblock tipe segi-enam abu-abu 8 cm, K-200 91,875 0.8 .
1.00 m2 Conblock 6,000 M.1476
0.05 m3 Pasir urug 10,000 M.10
0.50 oh Pekerja 42,500 L.1
0.25 oh Tukang batu 25,000 L.3
0.03 oh Kepala Tukang 3,750 L.9

Software RAB Exarch xPro 140/396


0.03 oh Mandor 4,625 L.10
AK-SNI 2008 S-229 1.00 m2 Pasang conblock tipe segi-empat, uni, segi-enam warna 8 91,875 0.8 .
1.00 m2 Conblock 6,000 M.1476
0.05 m3 Pasir urug 10,000 M.10
0.50 oh Pekerja 42,500 L.1
0.25 oh Tukang batu 25,000 L.3
0.03 oh Kepala Tukang 3,750 L.9
0.03 oh Mandor 4,625 L.10
AK-SNI 2008 S-230 1.00 m2 Pasang conblock tipe uni, segi-empat warna 8 cm, K-300 91,875 0.8 .
1.00 m2 Conblock 6,000 M.1476
0.05 m3 Pasir urug 10,000 M.10
0.50 oh Pekerja 42,500 L.1
0.25 oh Tukang batu 25,000 L.3
0.03 oh Kepala Tukang 3,750 L.9
0.03 oh Mandor 4,625 L.10
AK-SNI 2008 S-231 1.00 m2 Pasang conblock tipe segi-empat warna 6 cm, K-200 91,875 0.8 .
1.00 m2 Conblock 6,000 M.1476
0.05 m3 Pasir urug 10,000 M.10
0.50 oh Pekerja 42,500 L.1
0.25 oh Tukang batu 25,000 L.3
0.03 oh Kepala Tukang 3,750 L.9
0.03 oh Mandor 4,625 L.10
AK-SNI 2008 S-232 1.00 m2 Pasang conblock tipe segi-empat warna 8 cm, K-200 91,875 0.8 .
1.00 m2 Conblock 6,000 M.1476
0.05 m3 Pasir urug 10,000 M.10
0.50 oh Pekerja 42,500 L.1
0.25 oh Tukang batu 25,000 L.3
0.03 oh Kepala Tukang 3,750 L.9
0.03 oh Mandor 4,625 L.10
AK-SNI 2008 S-233 1.00 m2 Pasang conblock tipe segi-enam warna 6 cm, K-200 91,875 0.8 .
1.00 m2 Conblock 6,000 M.1476
0.05 m3 Pasir urug 10,000 M.10
0.50 oh Pekerja 42,500 L.1
0.25 oh Tukang batu 25,000 L.3
0.03 oh Kepala Tukang 3,750 L.9
0.03 oh Mandor 4,625 L.10
AK-SNI 2008 S-234 1.00 m2 Pasang conblock tipe segi-enam warna 8 cm, K-200 91,875 0.8 .
1.00 m2 Conblock 6,000 M.1476
0.05 m3 Pasir urug 10,000 M.10
0.50 oh Pekerja 42,500 L.1
0.25 oh Tukang batu 25,000 L.3
0.03 oh Kepala Tukang 3,750 L.9
0.03 oh Mandor 4,625 L.10
AK-SNI 2008 S-235 1.00 m2 Pasang grassblock bulat tebal 10 cm 130,875 0.8 .
1.00 m2 Grassblock 45,000 M.1525
0.05 m3 Pasir urug 10,000 M.10
0.50 oh Pekerja 42,500 L.1
0.25 oh Tukang batu 25,000 L.3
0.03 oh Kepala Tukang 3,750 L.9
0.03 oh Mandor 4,625 L.10
AK-SNI 2008 S-236 1.00 m2 Pasang grassblock tebal 10 cm 130,875 0.8 .
1.00 m2 Grassblock 45,000 M.1525
0.05 m3 Pasir urug 10,000 M.10
0.50 oh Pekerja 42,500 L.1
0.25 oh Tukang batu 25,000 L.3
0.03 oh Kepala Tukang 3,750 L.9
0.03 oh Mandor 4,625 L.10
SNI-2007 S-237 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kay 15,329,000 30.5 .
1.10 m3 Balok kayu jati (klas plitur) 12,210,000 M.1059
1.25 kg Paku Biasa 2" - 5" 31,250 M.111
1.00 kg Lem kayu 13,000 M.1493
7.00 oh Pekerja 595,000 L.1

Software RAB Exarch xPro 141/396


21.00 oh Tukang kayu 2,100,000 L.6
2.10 oh Kepala tukang 315,000 L.9
0.35 oh Mandor 64,750 L.10
SNI-2007 S-238 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, ka 13,129,000 30.5 .
1.10 m3 Balok kayu jati (lokal) 10,010,000 M.1060
1.25 kg Paku Biasa 2" - 5" 31,250 M.111
1.00 kg Lem kayu 13,000 M.1493
7.00 oh Pekerja 595,000 L.1
21.00 oh Tukang kayu 2,100,000 L.6
2.10 oh Kepala tukang 315,000 L.9
0.35 oh Mandor 64,750 L.10
SNI-2007 S-239 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, 10,149,750 26.1 .
1.20 m3 Balok kayu kamper 7,470,000 M.1061
1.25 kg Paku Biasa 2" - 5" 31,250 M.111
1.00 kg Lem kayu 13,000 M.1493
6.00 oh Pekerja 510,000 L.1
18.00 oh Tukang kayu 1,800,000 L.6
1.80 oh Kepala tukang 270,000 L.9
0.30 oh Mandor 55,500 L.10
SNI-2007 S-240 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, 10,179,750 26.1 .
1.20 m3 Balok kayu bengkirai 7,500,000 M.1057
1.25 kg Paku Biasa 2" - 5" 31,250 M.111
1.00 kg Lem kayu 13,000 M.1493
6.00 oh Pekerja 510,000 L.1
18.00 oh Tukang kayu 1,800,000 L.6
1.80 oh Kepala tukang 270,000 L.9
0.30 oh Mandor 55,500 L.10
SNI-2007 S-241 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, 8,079,750 26.1 .
1.20 m3 Balok kayu kruing 5,400,000 M.1063
1.25 kg Paku Biasa 2" - 5" 31,250 M.111
1.00 kg Lem kayu 13,000 M.1493
6.00 oh Pekerja 510,000 L.1
18.00 oh Tukang kayu 1,800,000 L.6
1.80 oh Kepala tukang 270,000 L.9
0.30 oh Mandor 55,500 L.10
SNI-2007 S-242 1.00 m2 Membuat dan memasang pintu klamp, kayu jati (klas plit 535,080 1.5 .
0.04 m3 Papan kayu jati (klas plitur) 380,000 M.1093
0.05 kg Paku Biasa 2" - 5" 1,250 M.111
0.35 oh Pekerja 29,750 L.1
1.05 oh Tukang kayu 105,000 L.6
0.11 oh Kepala tukang 15,750 L.9
0.02 oh Mandor 3,330 L.10
SNI-2007 S-243 1.00 m2 Membuat dan memasang pintu klamp, kayu jati (lokal) 535,080 1.5 .
0.04 m3 Papan kayu jati (lokal) 380,000 M.1094
0.05 kg Paku Biasa 2" - 5" 1,250 M.111
0.35 oh Pekerja 29,750 L.1
1.05 oh Tukang kayu 105,000 L.6
0.11 oh Kepala tukang 15,750 L.9
0.02 oh Mandor 3,330 L.10
SNI-2007 S-244 1.00 m2 Membuat dan memasang pintu klamp, kayu kamper 404,080 1.5 .
0.04 m3 Papan kayu kamper 249,000 M.1095
0.05 kg Paku Biasa 2" - 5" 1,250 M.111
0.35 oh Pekerja 29,750 L.1
1.05 oh Tukang kayu 105,000 L.6
0.11 oh Kepala tukang 15,750 L.9
0.02 oh Mandor 3,330 L.10
SNI-2007 S-245 1.00 m2 Membuat dan memasang pintu klamp, kayu bengkirai 405,080 1.5 .
0.04 m3 Papan kayu bengkirai 250,000 M.1091
0.05 kg Paku Biasa 2" - 5" 1,250 M.111
0.35 oh Pekerja 29,750 L.1
1.05 oh Tukang kayu 105,000 L.6
0.11 oh Kepala tukang 15,750 L.9

Software RAB Exarch xPro 142/396


0.02 oh Mandor 3,330 L.10
SNI-2007 S-246 1.00 m2 Membuat dan memasang pintu klamp, kayu kruing 335,080 1.5 .
0.04 m3 Papan kayu kruing 180,000 M.1097
0.05 kg Paku Biasa 2" - 5" 1,250 M.111
0.35 oh Pekerja 29,750 L.1
1.05 oh Tukang kayu 105,000 L.6
0.11 oh Kepala tukang 15,750 L.9
0.02 oh Mandor 3,330 L.10
SNI-2007 S-247 1.00 m2 Membuat dan memasang daun pintu panel, kayu jati (klas 825,750 4.4 .
0.04 m3 Papan kayu jati (klas plitur) 380,000 M.1093
0.50 kg Lem kayu 6,500 M.1493
1.00 oh Pekerja 85,000 L.1
3.00 oh Tukang kayu 300,000 L.6
0.30 oh Kepala tukang 45,000 L.9
0.05 oh Mandor 9,250 L.10
SNI-2007 S-248 1.00 m2 Membuat dan memasang daun pintu panel, kayu jati (loka 825,750 4.4 .
0.04 m3 Papan kayu jati (lokal) 380,000 M.1094
0.50 kg Lem kayu 6,500 M.1493
1.00 oh Pekerja 85,000 L.1
3.00 oh Tukang kayu 300,000 L.6
0.30 oh Kepala tukang 45,000 L.9
0.05 oh Mandor 9,250 L.10
SNI-2007 S-249 1.00 m2 Membuat dan memasang daun pintu panel, kayu kamper 694,750 4.4 .
0.04 m3 Papan kayu kamper 249,000 M.1095
0.50 kg Lem kayu 6,500 M.1493
1.00 oh Pekerja 85,000 L.1
3.00 oh Tukang kayu 300,000 L.6
0.30 oh Kepala tukang 45,000 L.9
0.05 oh Mandor 9,250 L.10
SNI-2007 S-250 1.00 m2 Membuat dan memasang daun pintu panel, kayu bengkir 695,750 4.4 .
0.04 m3 Papan kayu bengkirai 250,000 M.1091
0.50 kg Lem kayu 6,500 M.1493
1.00 oh Pekerja 85,000 L.1
3.00 oh Tukang kayu 300,000 L.6
0.30 oh Kepala tukang 45,000 L.9
0.05 oh Mandor 9,250 L.10
SNI-2007 S-251 1.00 m2 Membuat dan memasang daun pintu panel, kayu kruing 625,750 4.4 .
0.04 m3 Papan kayu kruing 180,000 M.1097
0.50 kg Lem kayu 6,500 M.1493
1.00 oh Pekerja 85,000 L.1
3.00 oh Tukang kayu 300,000 L.6
0.30 oh Kepala tukang 45,000 L.9
0.05 oh Mandor 9,250 L.10
SNI-2007 S-252 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu jati 583,300 3.5 .
0.02 m3 Papan kayu jati (klas plitur) 228,000 M.1093
0.30 kg Lem kayu 3,900 M.1493
0.80 oh Pekerja 68,000 L.1
2.40 oh Tukang kayu 240,000 L.6
0.24 oh Kepala tukang 36,000 L.9
0.04 oh Mandor 7,400 L.10
SNI-2007 S-253 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu jati 583,300 3.5 .
0.02 m3 Papan kayu jati (lokal) 228,000 M.1094
0.30 kg Lem kayu 3,900 M.1493
0.80 oh Pekerja 68,000 L.1
2.40 oh Tukang kayu 240,000 L.6
0.24 oh Kepala tukang 36,000 L.9
0.04 oh Mandor 7,400 L.10
SNI-2007 S-254 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu k 504,700 3.5 .
0.02 m3 Papan kayu kamper 149,400 M.1095
0.30 kg Lem kayu 3,900 M.1493
0.80 oh Pekerja 68,000 L.1
2.40 oh Tukang kayu 240,000 L.6

Software RAB Exarch xPro 143/396


0.24 oh Kepala tukang 36,000 L.9
0.04 oh Mandor 7,400 L.10
SNI-2007 S-255 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu be 505,300 3.5 .
0.02 m3 Papan kayu bengkirai 150,000 M.1091
0.30 kg Lem kayu 3,900 M.1493
0.80 oh Pekerja 68,000 L.1
2.40 oh Tukang kayu 240,000 L.6
0.24 oh Kepala tukang 36,000 L.9
0.04 oh Mandor 7,400 L.10
SNI-2007 S-256 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu kr 463,300 3.5 .
0.02 m3 Papan kayu kruing 108,000 M.1097
0.30 kg Lem kayu 3,900 M.1493
0.80 oh Pekerja 68,000 L.1
2.40 oh Tukang kayu 240,000 L.6
0.24 oh Kepala tukang 36,000 L.9
0.04 oh Mandor 7,400 L.10
SNI-2007 S-257 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu jati 1,053,750 4.4 .
0.06 m3 Papan kayu jati (klas plitur) 608,000 M.1093
0.50 kg Lem kayu 6,500 M.1493
1.00 oh Pekerja 85,000 L.1
3.00 oh Tukang kayu 300,000 L.6
0.30 oh Kepala tukang 45,000 L.9
0.05 oh Mandor 9,250 L.10
SNI-2007 S-258 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu jati 1,053,750 4.4 .
0.06 m3 Papan kayu jati (lokal) 608,000 M.1094
0.50 kg Lem kayu 6,500 M.1493
1.00 oh Pekerja 85,000 L.1
3.00 oh Tukang kayu 300,000 L.6
0.30 oh Kepala tukang 45,000 L.9
0.05 oh Mandor 9,250 L.10
SNI-2007 S-259 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu k 844,150 4.4 .
0.06 m3 Papan kayu kamper 398,400 M.1095
0.50 kg Lem kayu 6,500 M.1493
1.00 oh Pekerja 85,000 L.1
3.00 oh Tukang kayu 300,000 L.6
0.30 oh Kepala tukang 45,000 L.9
0.05 oh Mandor 9,250 L.10
SNI-2007 S-260 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu be 845,750 4.4 .
0.06 m3 Papan kayu bengkirai 400,000 M.1091
0.50 kg Lem kayu 6,500 M.1493
1.00 oh Pekerja 85,000 L.1
3.00 oh Tukang kayu 300,000 L.6
0.30 oh Kepala tukang 45,000 L.9
0.05 oh Mandor 9,250 L.10
SNI-2007 S-261 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu kr 733,750 4.4 .
0.06 m3 Papan kayu kruing 288,000 M.1097
0.50 kg Lem kayu 6,500 M.1493
1.00 oh Pekerja 85,000 L.1
3.00 oh Tukang kayu 300,000 L.6
0.30 oh Kepala tukang 45,000 L.9
0.05 oh Mandor 9,250 L.10
SNI-2007 S-262 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka 642,180 3.0 .
0.03 m3 Papan kayu jati (lokal) 237,500 M.1094
0.03 kg Paku Biasa ½" - 1" 705 M.110
0.50 kg Lem kayu 6,500 M.1493
1.00 lbr Plywood 120x240 tbl. 4 mm 90,000 M.58
0.70 oh Pekerja 59,500 L.1
2.10 oh Tukang kayu 210,000 L.6
0.21 oh Kepala tukang 31,500 L.9
0.04 oh Mandor 6,475 L.10
SNI-2007 S-263 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rang 560,305 3.0 .
0.03 m3 Papan kayu kamper 155,625 M.1095

Software RAB Exarch xPro 144/396


0.03 kg Paku Biasa ½" - 1" 705 M.110
0.50 kg Lem kayu 6,500 M.1493
1.00 lbr Plywood 120x240 tbl. 4 mm 90,000 M.58
0.70 oh Pekerja 59,500 L.1
2.10 oh Tukang kayu 210,000 L.6
0.21 oh Kepala tukang 31,500 L.9
0.04 oh Mandor 6,475 L.10
SNI-2007 S-264 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangk 560,930 3.0 .
0.03 m3 Papan kayu bengkirai 156,250 M.1091
0.03 kg Paku Biasa ½" - 1" 705 M.110
0.50 kg Lem kayu 6,500 M.1493
1.00 lbr Plywood 120x240 tbl. 4 mm 90,000 M.58
0.70 oh Pekerja 59,500 L.1
2.10 oh Tukang kayu 210,000 L.6
0.21 oh Kepala tukang 31,500 L.9
0.04 oh Mandor 6,475 L.10
SNI-2007 S-265 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangk 517,180 3.0 .
0.03 m3 Papan kayu kruing 112,500 M.1097
0.03 kg Paku Biasa ½" - 1" 705 M.110
0.50 kg Lem kayu 6,500 M.1493
1.00 lbr Plywood 120x240 tbl. 4 mm 90,000 M.58
0.70 oh Pekerja 59,500 L.1
2.10 oh Tukang kayu 210,000 L.6
0.21 oh Kepala tukang 31,500 L.9
0.04 oh Mandor 6,475 L.10
SNI-2007 S-266 1.00 m2 Memasang jalusi kusen, kayu jati (klas plitur) 922,450 3.2 .
0.06 m3 Papan kayu jati (klas plitur) 570,000 M.1093
0.15 kg Paku Biasa ½" - 1" 3,525 M.110
0.67 oh Pekerja 56,950 L.1
2.00 oh Tukang kayu 200,000 L.6
0.20 oh Kepala tukang 30,000 L.9
0.34 oh Mandor 61,975 L.10
SNI-2007 S-267 1.00 m2 Memasang jalusi kusen, kayu jati (lokal) 922,450 3.2 .
0.06 m3 Papan kayu jati (lokal) 570,000 M.1094
0.15 kg Paku Biasa ½" - 1" 3,525 M.110
0.67 oh Pekerja 56,950 L.1
2.00 oh Tukang kayu 200,000 L.6
0.20 oh Kepala tukang 30,000 L.9
0.34 oh Mandor 61,975 L.10
SNI-2007 S-268 1.00 m2 Memasang jalusi kusen, kayu kamper 725,950 3.2 .
0.06 m3 Papan kayu kamper 373,500 M.1095
0.15 kg Paku Biasa ½" - 1" 3,525 M.110
0.67 oh Pekerja 56,950 L.1
2.00 oh Tukang kayu 200,000 L.6
0.20 oh Kepala tukang 30,000 L.9
0.34 oh Mandor 61,975 L.10
SNI-2007 S-269 1.00 m2 Memasang jalusi kusen, kayu bengkirai 727,450 3.2 .
0.06 m3 Papan kayu bengkirai 375,000 M.1091
0.15 kg Paku Biasa ½" - 1" 3,525 M.110
0.67 oh Pekerja 56,950 L.1
2.00 oh Tukang kayu 200,000 L.6
0.20 oh Kepala tukang 30,000 L.9
0.34 oh Mandor 61,975 L.10
SNI-2007 S-270 1.00 m2 Memasang jalusi kusen, kayu kruing 622,450 3.2 .
0.06 m3 Papan kayu kruing 270,000 M.1097
0.15 kg Paku Biasa ½" - 1" 3,525 M.110
0.67 oh Pekerja 56,950 L.1
2.00 oh Tukang kayu 200,000 L.6
0.20 oh Kepala tukang 30,000 L.9
0.34 oh Mandor 61,975 L.10
SNI-2002 S-271 1.00 m2 Pasang pintu teakwood rangkap, rangka kayu jati (lokal) 547,355 2.8 .
0.02 m3 Papan kayu jati (lokal) 186,200 M.1094

Software RAB Exarch xPro 145/396


0.03 kg Paku Biasa ½" - 1" 705 M.110
0.30 kg Lem kayu 3,900 M.1493
1.00 lbr Teakwood 4 mm, 120 x 240 70,000 M.1323
0.60 oh Pekerja 51,000 L.1
2.00 oh Tukang kayu 200,000 L.6
0.20 oh Kepala Tukang 30,000 L.9
0.03 oh Mandor 5,550 L.10
SNI-2002 S-272 1.00 m2 Pasang pintu teakwood rangkap, rangka kayu kamper 483,165 2.8 .
0.02 m3 Papan kayu kamper 122,010 M.1095
0.03 kg Paku Biasa ½" - 1" 705 M.110
0.30 kg Lem kayu 3,900 M.1493
1.00 lbr Teakwood 4 mm, 120 x 240 70,000 M.1323
0.60 oh Pekerja 51,000 L.1
2.00 oh Tukang kayu 200,000 L.6
0.20 oh Kepala Tukang 30,000 L.9
0.03 oh Mandor 5,550 L.10
SNI-2002 S-273 1.00 m2 Pasang pintu teakwood rangkap, rangka kayu bengkirai 483,655 2.8 .
0.02 m3 Papan kayu bengkirai 122,500 M.1091
0.03 kg Paku Biasa ½" - 1" 705 M.110
0.30 kg Lem kayu 3,900 M.1493
1.00 lbr Teakwood 4 mm, 120 x 240 70,000 M.1323
0.60 oh Pekerja 51,000 L.1
2.00 oh Tukang kayu 200,000 L.6
0.20 oh Kepala Tukang 30,000 L.9
0.03 oh Mandor 5,550 L.10
SNI-2002 S-274 1.00 m2 Pasang pintu teakwood rangkap, rangka kayu kruing 449,355 2.8 .
0.02 m3 Papan kayu kruing 88,200 M.1097
0.03 kg Paku Biasa ½" - 1" 705 M.110
0.30 kg Lem kayu 3,900 M.1493
1.00 lbr Teakwood 4 mm, 120 x 240 70,000 M.1323
0.60 oh Pekerja 51,000 L.1
2.00 oh Tukang kayu 200,000 L.6
0.20 oh Kepala Tukang 30,000 L.9
0.03 oh Mandor 5,550 L.10
SNI-2007 S-275 1.00 m2 Memasang teakwood rangkap lapis formika, rangka expo 643,185 3.7 .
0.03 m3 Papan kayu kamper 155,625 M.1095
0.03 kg Paku Biasa ½" - 1" 705 M.110
0.80 kg Lem kayu 10,400 M.1493
1.00 lbr Teakwood 4 mm 90 x 220 cm 58,000 M.1322
0.50 lbr Formika 45,000 M.1309
0.85 oh Pekerja 72,250 L.1
2.55 oh Tukang kayu 255,000 L.6
0.26 oh Kepala tukang 38,250 L.9
0.04 oh Mandor 7,955 L.10
SNI-2007 S-276 1.00 m2 Memasang teakwood rangkap lapis formika, rangka expos 643,810 3.7 .
0.03 m3 Papan kayu bengkirai 156,250 M.1091
0.03 kg Paku Biasa ½" - 1" 705 M.110
0.80 kg Lem kayu 10,400 M.1493
1.00 lbr Teakwood 4 mm 90 x 220 cm 58,000 M.1322
0.50 lbr Formika 45,000 M.1309
0.85 oh Pekerja 72,250 L.1
2.55 oh Tukang kayu 255,000 L.6
0.26 oh Kepala tukang 38,250 L.9
0.04 oh Mandor 7,955 L.10
SNI-2007 S-277 1.00 m2 Memasang teakwood rangkap lapis formika, rangka expo 600,060 3.7 .
0.03 m3 Papan kayu kruing 112,500 M.1097
0.03 kg Paku Biasa ½" - 1" 705 M.110
0.80 kg Lem kayu 10,400 M.1493
1.00 lbr Teakwood 4 mm 90 x 220 cm 58,000 M.1322
0.50 lbr Formika 45,000 M.1309
0.85 oh Pekerja 72,250 L.1
2.55 oh Tukang kayu 255,000 L.6

Software RAB Exarch xPro 146/396


0.26 oh Kepala tukang 38,250 L.9
0.04 oh Mandor 7,955 L.10
SNI-2007 S-278 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu jati ( 12,534,500 17.4 .
1.10 m3 Kayu jati (klas plitur) balok 10,450,000 M.1071
15.00 kg Baja strip (0,2 x 2) cm 187,500 M.15
5.60 kg Paku biasa 2" - 5" 140,000 M.111
4.00 oh Pekerja 340,000 L.1
12.00 oh Tukang kayu 1,200,000 L.6
1.20 oh Kepala tukang 180,000 L.9
0.20 oh Mandor 37,000 L.10
SNI-2007 S-279 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu jati 10,334,500 17.4 .
1.10 m3 Kayu jati (lokal) balok 8,250,000 M.1072
15.00 kg Baja strip (0,2 x 2) cm 187,500 M.15
5.60 kg Paku biasa 2" - 5" 140,000 M.111
4.00 oh Pekerja 340,000 L.1
12.00 oh Tukang kayu 1,200,000 L.6
1.20 oh Kepala tukang 180,000 L.9
0.20 oh Mandor 37,000 L.10
SNI-2007 S-280 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu kam 8,932,000 17.4 .
1.10 m3 Kayu kamper balok 6,847,500 M.1073
15.00 kg Baja strip (0,2 x 2) cm 187,500 M.15
5.60 kg Paku biasa 2" - 5" 140,000 M.111
4.00 oh Pekerja 340,000 L.1
12.00 oh Tukang kayu 1,200,000 L.6
1.20 oh Kepala tukang 180,000 L.9
0.20 oh Mandor 37,000 L.10
SNI-2007 S-281 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu beng 8,959,500 17.4 .
1.10 m3 Kayu bengkirai balok 6,875,000 M.1069
15.00 kg Baja strip (0,2 x 2) cm 187,500 M.15
5.60 kg Paku biasa 2" - 5" 140,000 M.111
4.00 oh Pekerja 340,000 L.1
12.00 oh Tukang kayu 1,200,000 L.6
1.20 oh Kepala tukang 180,000 L.9
0.20 oh Mandor 37,000 L.10
SNI-2007 S-282 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu krui 7,034,500 17.4 .
1.10 m3 Kayu kruing balok 4,950,000 M.1075
15.00 kg Baja strip (0,2 x 2) cm 187,500 M.15
5.60 kg Paku biasa 2" - 5" 140,000 M.111
4.00 oh Pekerja 340,000 L.1
12.00 oh Tukang kayu 1,200,000 L.6
1.20 oh Kepala tukang 180,000 L.9
0.20 oh Mandor 37,000 L.10
SNI-2007 S-283 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu glug 3,844,500 17.4 .
1.10 m3 Kayu glugu balok 1,760,000 M.1070
15.00 kg Baja strip (0,2 x 2) cm 187,500 M.15
5.60 kg Paku biasa 2" - 5" 140,000 M.111
4.00 oh Pekerja 340,000 L.1
12.00 oh Tukang kayu 1,200,000 L.6
1.20 oh Kepala tukang 180,000 L.9
0.20 oh Mandor 37,000 L.10
SNI-2007 S-284 1.00 m3 Memasang konstruksi kuda-kuda expose, kayu jati (klas p 14,670,475 29.1 .
1.20 m3 Kayu jati (klas plitur) balok 11,400,000 M.1071
15.00 kg Baja strip (0,2 x 2) cm 187,500 M.15
5.60 kg Paku biasa 2" - 5" 140,000 M.111
6.70 oh Pekerja 569,500 L.1
20.10 oh Tukang kayu 2,010,000 L.6
2.01 oh Kepala tukang 301,500 L.9
0.34 oh Mandor 61,975 L.10
SNI-2007 S-285 1.00 m3 Memasang konstruksi kuda-kuda expose, kayu jati lokal 12,270,475 29.1 .
1.20 m3 Kayu jati (lokal) balok 9,000,000 M.1072
15.00 kg Baja strip (0,2 x 2) cm 187,500 M.15
5.60 kg Paku biasa 2" - 5" 140,000 M.111

Software RAB Exarch xPro 147/396


6.70 oh Pekerja 569,500 L.1
20.10 oh Tukang kayu 2,010,000 L.6
2.01 oh Kepala tukang 301,500 L.9
0.34 oh Mandor 61,975 L.10
SNI-2007 S-286 1.00 m3 Memasang konstruksi kuda-kuda expose, kayu kamper 10,740,475 29.1 .
1.20 m3 Kayu kamper balok 7,470,000 M.1073
15.00 kg Baja strip (0,2 x 2) cm 187,500 M.15
5.60 kg Paku biasa 2" - 5" 140,000 M.111
6.70 oh Pekerja 569,500 L.1
20.10 oh Tukang kayu 2,010,000 L.6
2.01 oh Kepala tukang 301,500 L.9
0.34 oh Mandor 61,975 L.10
SNI-2007 S-287 1.00 m3 Memasang konstruksi kuda-kuda expose, kayu kruing 8,670,475 29.1 .
1.20 m3 Kayu kruing balok 5,400,000 M.1075
15.00 kg Baja strip (0,2 x 2) cm 187,500 M.15
5.60 kg Paku biasa 2" - 5" 140,000 M.111
6.70 oh Pekerja 569,500 L.1
20.10 oh Tukang kayu 2,010,000 L.6
2.01 oh Kepala tukang 301,500 L.9
0.34 oh Mandor 61,975 L.10
SNI-2007 S-288 1.00 m3 Memasang konstruksi kuda-kuda expose, kayu bengkirai 10,770,475 29.1 .
1.20 m3 Kayu bengkirai balok 7,500,000 M.1069
15.00 kg Baja strip (0,2 x 2) cm 187,500 M.15
5.60 kg Paku biasa 2" - 5" 140,000 M.111
6.70 oh Pekerja 569,500 L.1
20.10 oh Tukang kayu 2,010,000 L.6
2.01 oh Kepala tukang 301,500 L.9
0.34 oh Mandor 61,975 L.10
SNI-2007 S-289 1.00 m3 Memasang konstruksi gordeng, kayu jati (klas plitur) 11,766,700 10.4 .
1.10 m3 Kayu jati (klas plitur) balok 10,450,000 M.1071
15.00 kg Baja strip (0,2 x 2) cm 187,500 M.15
3.00 kg Paku biasa 2" - 5" 75,000 M.111
2.40 oh Pekerja 204,000 L.1
7.20 oh Tukang kayu 720,000 L.6
0.72 oh Kepala tukang 108,000 L.9
0.12 oh Mandor 22,200 L.10
SNI-2007 S-290 1.00 m3 Memasang konstruksi gordeng, kayu jati lokal 9,566,700 10.4 .
1.10 m3 Kayu jati (lokal) balok 8,250,000 M.1072
15.00 kg Baja strip (0,2 x 2) cm 187,500 M.15
3.00 kg Paku biasa 2" - 5" 75,000 M.111
2.40 oh Pekerja 204,000 L.1
7.20 oh Tukang kayu 720,000 L.6
0.72 oh Kepala tukang 108,000 L.9
0.12 oh Mandor 22,200 L.10
SNI-2007 S-291 1.00 m3 Memasang konstruksi gordeng, kayu kamper 8,164,200 10.4 .
1.10 m3 Kayu kamper balok 6,847,500 M.1073
15.00 kg Baja strip (0,2 x 2) cm 187,500 M.15
3.00 kg Paku biasa 2" - 5" 75,000 M.111
2.40 oh Pekerja 204,000 L.1
7.20 oh Tukang kayu 720,000 L.6
0.72 oh Kepala tukang 108,000 L.9
0.12 oh Mandor 22,200 L.10
SNI-2007 S-292 1.00 m3 Memasang konstruksi gordeng, kayu bengkirai 8,191,700 10.4 .
1.10 m3 Kayu bengkirai balok 6,875,000 M.1069
15.00 kg Baja strip (0,2 x 2) cm 187,500 M.15
3.00 kg Paku biasa 2" - 5" 75,000 M.111
2.40 oh Pekerja 204,000 L.1
7.20 oh Tukang kayu 720,000 L.6
0.72 oh Kepala tukang 108,000 L.9
0.12 oh Mandor 22,200 L.10
SNI-2007 S-293 1.00 m3 Memasang konstruksi gordeng, kayu kruing 6,266,700 10.4 .
1.10 m3 Kayu kruing balok 4,950,000 M.1075

Software RAB Exarch xPro 148/396


15.00 kg Baja strip (0,2 x 2) cm 187,500 M.15
3.00 kg Paku biasa 2" - 5" 75,000 M.111
2.40 oh Pekerja 204,000 L.1
7.20 oh Tukang kayu 720,000 L.6
0.72 oh Kepala tukang 108,000 L.9
0.12 oh Mandor 22,200 L.10
SNI-2007 S-294 1.00 m3 Memasang konstruksi gordeng, kayu glugu 3,076,700 10.4 .
1.10 m3 Kayu glugu balok 1,760,000 M.1070
15.00 kg Baja strip (0,2 x 2) cm 187,500 M.15
3.00 kg Paku biasa 2" - 5" 75,000 M.111
2.40 oh Pekerja 204,000 L.1
7.20 oh Tukang kayu 720,000 L.6
0.72 oh Kepala tukang 108,000 L.9
0.12 oh Mandor 22,200 L.10
AK-SNI 2008 S-295 1.00 m2 Memasang usuk jati (lokal) 5/7, reng jati (lokal) 2/3 127,825 0.2 .
2.20 m1 Usuk kayu jati (lokal) 5/7 73,150 M.1051
5.00 m1 Reng jati (lokal) 2/3 29,700 M.1034
0.15 kg Paku usuk 2,400 M.1144
0.10 kg Paku reng 1,650 M.1137
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
AK-SNI 2008 S-296 1.00 m2 Memasang usuk kamper 5/7, reng jati (lokal) 2/3 104,725 0.2 .
2.20 m1 Usuk kayu kamper 5/7 50,050 M.1053
5.00 m1 Reng jati (lokal) 2/3 29,700 M.1034
0.15 kg Paku usuk 2,400 M.1144
0.10 kg Paku reng 1,650 M.1137
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
AK-SNI 2008 S-297 1.00 m2 Memasang usuk kamper 5/7, reng kamper 2/3 95,725 0.2 .
2.20 m1 Usuk kayu kamper 5/7 50,050 M.1053
5.00 m1 Reng kamper 2/3 20,700 M.1037
0.15 kg Paku usuk 2,400 M.1144
0.10 kg Paku reng 1,650 M.1137
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
AK-SNI 2008 S-298 1.00 m2 Memasang usuk bengkirai 5/7, reng jati (lokal) 2/3 104,725 0.2 .
2.20 m1 Usuk kayu bengkirai 5/7 50,050 M.1050
5.00 m1 Reng jati (lokal) 2/3 29,700 M.1034
0.15 kg Paku usuk 2,400 M.1144
0.10 kg Paku reng 1,650 M.1137
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
AK-SNI 2008 S-299 1.00 m2 Memasang usuk bengkirai 5/7, reng bengkirai 2/3 97,525 0.2 .
2.20 m1 Usuk kayu bengkirai 5/7 50,050 M.1050
5.00 m1 Reng bengkirai 2/3 22,500 M.1032
0.15 kg Paku usuk 2,400 M.1144
0.10 kg Paku reng 1,650 M.1137
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
AK-SNI 2008 S-300 1.00 m2 Memasang usuk kruing 5/7, reng jati (lokal) 2/3 89,325 0.2 .
2.20 m1 Usuk kayu kruing 5/7 34,650 M.1054
5.00 m1 Reng jati (lokal) 2/3 29,700 M.1034

Software RAB Exarch xPro 149/396


0.15 kg Paku usuk 2,400 M.1144
0.10 kg Paku reng 1,650 M.1137
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
AK-SNI 2008 S-301 1.00 m2 Memasang usuk kruing 5/7, reng kruing 2/3 77,325 0.2 .
2.20 m1 Usuk kayu kruing 5/7 34,650 M.1054
5.00 m1 Reng kruing 2/3 17,700 M.1039
0.15 kg Paku usuk 2,400 M.1144
0.10 kg Paku reng 1,650 M.1137
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
AK-SNI 2008 S-302 1.00 m2 Memasang usuk jati 5/7 (klas 1), reng jati 3/4 (klas 1) 191,525 0.2 .
2.20 m1 Usuk kayu jati 5/7 (klas 1) 88,550 M.1052
5.00 m1 Reng jati 3/4 (klas 1) 78,000 M.1036
0.15 kg Paku usuk 2,400 M.1144
0.10 kg Paku reng 1,650 M.1137
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
AK-SNI 2008 S-303 1.00 m2 Memasang usuk kamper 5/7, reng jati (lokal) 3/4 134,425 0.2 .
2.20 m1 Usuk kayu kamper 5/7 50,050 M.1053
5.00 m1 Reng jati (lokal) 3/4 59,400 M.1035
0.15 kg Paku usuk 2,400 M.1144
0.10 kg Paku reng 1,650 M.1137
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
AK-SNI 2008 S-304 1.00 m2 Memasang usuk kamper 5/7, reng kamper 3/4 116,425 0.2 .
2.20 m1 Usuk kayu kamper 5/7 50,050 M.1053
5.00 m1 Reng kamper 3/4 41,400 M.1038
0.15 kg Paku usuk 2,400 M.1144
0.10 kg Paku reng 1,650 M.1137
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
AK-SNI 2008 S-305 1.00 m2 Memasang usuk bengkirai 5/7, reng jati (lokal) 3/4 134,425 0.2 .
2.20 m1 Usuk kayu bengkirai 5/7 50,050 M.1050
5.00 m1 Reng jati (lokal) 3/4 59,400 M.1035
0.15 kg Paku usuk 2,400 M.1144
0.10 kg Paku reng 1,650 M.1137
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
AK-SNI 2008 S-306 1.00 m2 Memasang usuk bengkirai 5/7, reng bengkirai 3/4 120,025 0.2 .
2.20 m1 Usuk kayu bengkirai 5/7 50,050 M.1050
5.00 m1 Reng bengkirai 3/4 45,000 M.1033
0.15 kg Paku usuk 2,400 M.1144
0.10 kg Paku reng 1,650 M.1137
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
AK-SNI 2008 S-307 1.00 m2 Memasang usuk kruing 5/7, reng jati (lokal) 3/4 119,025 0.2 .
2.20 m1 Usuk kayu kruing 5/7 34,650 M.1054

Software RAB Exarch xPro 150/396


5.00 m1 Reng jati (lokal) 3/4 59,400 M.1035
0.15 kg Paku usuk 2,400 M.1144
0.10 kg Paku reng 1,650 M.1137
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
AK-SNI 2008 S-308 1.00 m2 Memasang usuk kruing 5/7, reng kruing 3/4 95,025 0.2 .
2.20 m1 Usuk kayu kruing 5/7 34,650 M.1054
5.00 m1 Reng kruing 3/4 35,400 M.1040
0.15 kg Paku usuk 2,400 M.1144
0.10 kg Paku reng 1,650 M.1137
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-309 1.00 m2 Memasang rangka atap sirap, kayu jati (lokal) 1,267,610 0.3 .
0.17 m3 Kayu jati (lokal) balok 1,237,500 M.1072
0.20 kg Paku Biasa 2" - 5" 5,000 M.111
0.12 oh Pekerja 10,200 L.1
0.12 oh Tukang kayu 12,000 L.6
0.01 oh Kepala tukang 1,800 L.9
0.01 oh Mandor 1,110 L.10
SNI-2007 S-310 1.00 m2 Memasang rangka atap sirap, kayu kamper 1,057,235 0.3 .
0.17 m3 Kayu kamper balok 1,027,125 M.1073
0.20 kg Paku Biasa 2" - 5" 5,000 M.111
0.12 oh Pekerja 10,200 L.1
0.12 oh Tukang kayu 12,000 L.6
0.01 oh Kepala tukang 1,800 L.9
0.01 oh Mandor 1,110 L.10
SNI-2007 S-311 1.00 m2 Memasang rangka atap sirap, kayu bengkirai 1,061,360 0.3 .
0.17 m3 Kayu bengkirai balok 1,031,250 M.1069
0.20 kg Paku Biasa 2" - 5" 5,000 M.111
0.12 oh Pekerja 10,200 L.1
0.12 oh Tukang kayu 12,000 L.6
0.01 oh Kepala tukang 1,800 L.9
0.01 oh Mandor 1,110 L.10
SNI-2007 S-312 1.00 m2 Memasang rangka atap sirap, kayu kruing 772,610 0.3 .
0.17 m3 Kayu kruing balok 742,500 M.1075
0.20 kg Paku Biasa 2" - 5" 5,000 M.111
0.12 oh Pekerja 10,200 L.1
0.12 oh Tukang kayu 12,000 L.6
0.01 oh Kepala tukang 1,800 L.9
0.01 oh Mandor 1,110 L.10
SNI-2007 S-313 1.00 m2 Memasang rangka langit-langit (50 x 100) cm, kayu jati (l 237,065 0.6 .
0.02 m3 Kaso-kaso (5 x 7) cm jati lokal 170,940 M.1044
0.20 kg Paku Biasa 2" - 5" 5,000 M.111
0.15 oh Pekerja 12,750 L.1
0.30 oh Tukang kayu 30,000 L.6
0.03 oh Kepala tukang 4,500 L.9
0.08 oh Mandor 13,875 L.10
SNI-2007 S-314 1.00 m2 Memasang rangka langit-langit (50 x 100) cm, kayu kamp 161,990 0.6 .
0.02 m3 Kaso-kaso (5 x 7) cm kamper 95,865 M.1045
0.20 kg Paku Biasa 2" - 5" 5,000 M.111
0.15 oh Pekerja 12,750 L.1
0.30 oh Tukang kayu 30,000 L.6
0.03 oh Kepala tukang 4,500 L.9
0.08 oh Mandor 13,875 L.10
SNI-2007 S-315 1.00 m2 Memasang rangka langit-langit (50 x 100) cm, kayu bengk 162,375 0.6 .
0.02 m3 Kaso-kaso (5 x 7) cm bengkirai 96,250 M.1043
0.20 kg Paku Biasa 2" - 5" 5,000 M.111
0.15 oh Pekerja 12,750 L.1

Software RAB Exarch xPro 151/396


0.30 oh Tukang kayu 30,000 L.6
0.03 oh Kepala tukang 4,500 L.9
0.08 oh Mandor 13,875 L.10
SNI-2007 S-316 1.00 m2 Memasang rangka langit-langit (50 x 100) cm, kayu kruin 135,425 0.6 .
0.02 m3 Kaso-kaso (5 x 7) cm kruing 69,300 M.1046
0.20 kg Paku Biasa 2" - 5" 5,000 M.111
0.15 oh Pekerja 12,750 L.1
0.30 oh Tukang kayu 30,000 L.6
0.03 oh Kepala tukang 4,500 L.9
0.08 oh Mandor 13,875 L.10
SNI-2007 S-317 1.00 m2 Memasang rangka langit-langit (60 x 60) cm, kayu jati (lo 240,530 0.5 .
0.02 m3 Kaso-kaso (5 x 7) cm jati lokal 180,930 M.1044
0.25 kg Paku Biasa 2" - 5" 6,250 M.111
0.20 oh Pekerja 17,000 L.1
0.30 oh Tukang kayu 30,000 L.6
0.03 oh Kepala tukang 4,500 L.9
0.01 oh Mandor 1,850 L.10
SNI-2007 S-318 1.00 m2 Memasang rangka langit-langit (60 x 60) cm, kayu kampe 161,068 0.5 .
0.02 m3 Kaso-kaso (5 x 7) cm kamper 101,468 M.1045
0.25 kg Paku Biasa 2" - 5" 6,250 M.111
0.20 oh Pekerja 17,000 L.1
0.30 oh Tukang kayu 30,000 L.6
0.03 oh Kepala tukang 4,500 L.9
0.01 oh Mandor 1,850 L.10
SNI-2007 S-319 1.00 m2 Memasang rangka langit-langit (60 x 60) cm, kayu bengki 161,475 0.5 .
0.02 m3 Kaso-kaso (5 x 7) cm bengkirai 101,875 M.1043
0.25 kg Paku Biasa 2" - 5" 6,250 M.111
0.20 oh Pekerja 17,000 L.1
0.30 oh Tukang kayu 30,000 L.6
0.03 oh Kepala tukang 4,500 L.9
0.01 oh Mandor 1,850 L.10
SNI-2007 S-320 1.00 m2 Memasang rangka langit-langit (60 x 60) cm, kayu kruing 132,950 0.5 .
0.02 m3 Kaso-kaso (5 x 7) cm kruing 73,350 M.1046
0.25 kg Paku Biasa 2" - 5" 6,250 M.111
0.20 oh Pekerja 17,000 L.1
0.30 oh Tukang kayu 30,000 L.6
0.03 oh Kepala tukang 4,500 L.9
0.01 oh Mandor 1,850 L.10
AK-SNI 2008 S-321 1.00 m2 Memasang rangka langit-langit (60 x 120) cm, kayu jati (l 147,573 0.5 .
0.01 m3 Kayu jati (lokal) balok 97,500 M.1072
0.12 kg Paku Biasa 2" - 5" 3,000 M.111
0.17 oh Pekerja 14,450 L.1
0.27 oh Tukang kayu 27,000 L.6
0.03 oh Kepala Tukang 4,050 L.9
0.01 oh Mandor 1,573 L.10
AK-SNI 2008 S-322 1.00 m2 Memasang rangka langit-langit (60 x 120) cm, kayu kamp 130,998 0.5 .
0.01 m3 Kayu kamper balok 80,925 M.1073
0.12 kg Paku Biasa 2" - 5" 3,000 M.111
0.17 oh Pekerja 14,450 L.1
0.27 oh Tukang kayu 27,000 L.6
0.03 oh Kepala Tukang 4,050 L.9
0.01 oh Mandor 1,573 L.10
AK-SNI 2008 S-323 1.00 m2 Memasang rangka langit-langit (60 x 120) cm, kayu bengk 131,323 0.5 .
0.01 m3 Kayu bengkirai balok 81,250 M.1069
0.12 kg Paku Biasa 2" - 5" 3,000 M.111
0.17 oh Pekerja 14,450 L.1
0.27 oh Tukang kayu 27,000 L.6
0.03 oh Kepala Tukang 4,050 L.9
0.01 oh Mandor 1,573 L.10
AK-SNI 2008 S-324 1.00 m2 Memasang rangka langit-langit (60 x 120) cm, kayu kruin 108,573 0.5 .
0.01 m3 Kayu kruing balok 58,500 M.1075
0.12 kg Paku Biasa 2" - 5" 3,000 M.111

Software RAB Exarch xPro 152/396


0.17 oh Pekerja 14,450 L.1
0.27 oh Tukang kayu 27,000 L.6
0.03 oh Kepala Tukang 4,050 L.9
0.01 oh Mandor 1,573 L.10
SNI-2002 S-325 1.00 m2 Memasang rangka langit-langit (1,00 x 1,00) m, kayu jati ( 135,388 0.4 .
0.01 m3 Kayu jati (lokal) balok 90,000 M.1072
0.10 kg Paku biasa 2" - 5" 2,500 M.111
0.15 oh Pekerja 12,750 L.1
0.25 oh Tukang kayu 25,000 L.6
0.03 oh Kepala Tukang 3,750 L.9
0.01 oh Mandor 1,388 L.10
SNI-2002 S-326 1.00 m2 Memasang rangka langit-langit (1,00 x 1,00) m, kayu ka 120,088 0.4 .
0.01 m3 Kayu kamper balok 74,700 M.1073
0.10 kg Paku biasa 2" - 5" 2,500 M.111
0.15 oh Pekerja 12,750 L.1
0.25 oh Tukang kayu 25,000 L.6
0.03 oh Kepala Tukang 3,750 L.9
0.01 oh Mandor 1,388 L.10
SNI-2002 S-327 1.00 m2 Memasang rangka langit-langit (1,00 x 1,00) m, kayu beng 120,388 0.4 .
0.01 m3 Kayu bengkirai balok 75,000 M.1069
0.10 kg Paku biasa 2" - 5" 2,500 M.111
0.15 oh Pekerja 12,750 L.1
0.25 oh Tukang kayu 25,000 L.6
0.03 oh Kepala Tukang 3,750 L.9
0.01 oh Mandor 1,388 L.10
SNI-2002 S-328 1.00 m2 Memasang rangka langit-langit (1,00 x 1,00) m, kayu kru 99,388 0.4 .
0.01 m3 Kayu kruing balok 54,000 M.1075
0.10 kg Paku biasa 2" - 5" 2,500 M.111
0.15 oh Pekerja 12,750 L.1
0.25 oh Tukang kayu 25,000 L.6
0.03 oh Kepala Tukang 3,750 L.9
0.01 oh Mandor 1,388 L.10
SNI-2002 S-329 1.00 m2 Memasang lisplank ukuran (3 x 20) cm, kayu jati (klas pl 102,825 0.3 .
0.01 m3 Papan kayu jati (klas plitur) 68,400 M.1093
0.05 kg Paku biasa 2" - 5" 1,250 M.111
0.10 oh Pekerja 8,500 L.1
0.20 oh Tukang kayu 20,000 L.6
0.03 oh Kepala Tukang 3,750 L.9
0.01 oh Mandor 925 L.10
SNI-2002 S-330 1.00 m2 Memasang lisplank ukuran (3 x 20) cm, kayu jati (lokal) 102,825 0.3 .
0.01 m3 Papan kayu jati (lokal) 68,400 M.1094
0.05 kg Paku biasa 2" - 5" 1,250 M.111
0.10 oh Pekerja 8,500 L.1
0.20 oh Tukang kayu 20,000 L.6
0.03 oh Kepala Tukang 3,750 L.9
0.01 oh Mandor 925 L.10
SNI-2002 S-331 1.00 m2 Memasang lisplank ukuran (3 x 20) cm, kayu kamper 79,245 0.3 .
0.01 m3 Papan kayu kamper 44,820 M.1095
0.05 kg Paku biasa 2" - 5" 1,250 M.111
0.10 oh Pekerja 8,500 L.1
0.20 oh Tukang kayu 20,000 L.6
0.03 oh Kepala Tukang 3,750 L.9
0.01 oh Mandor 925 L.10
SNI-2002 S-332 1.00 m2 Memasang lisplank ukuran (3 x 20) cm, kayu bengkirai 79,425 0.3 .
0.01 m3 Papan kayu bengkirai 45,000 M.1091
0.05 kg Paku biasa 2" - 5" 1,250 M.111
0.10 oh Pekerja 8,500 L.1
0.20 oh Tukang kayu 20,000 L.6
0.03 oh Kepala Tukang 3,750 L.9
0.01 oh Mandor 925 L.10
SNI-2002 S-333 1.00 m2 Memasang lisplank ukuran (3 x 20) cm, kayu kruing 66,825 0.3 .
0.01 m3 Papan kayu kruing 32,400 M.1097

Software RAB Exarch xPro 153/396


0.05 kg Paku biasa 2" - 5" 1,250 M.111
0.10 oh Pekerja 8,500 L.1
0.20 oh Tukang kayu 20,000 L.6
0.03 oh Kepala Tukang 3,750 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-334 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu jati (klas pli 138,175 0.3 .
0.01 m3 Papan kayu jati (klas plitur) 104,500 M.1093
0.05 kg Paku Biasa 2" - 5" 1,250 M.111
0.10 oh Pekerja 8,500 L.1
0.20 oh Tukang kayu 20,000 L.6
0.02 oh Kepala tukang 3,000 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-335 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu ati (lokal) 138,175 0.3 .
0.01 m3 Papan kayu jati (lokal) 104,500 M.1094
0.05 kg Paku Biasa 2" - 5" 1,250 M.111
0.10 oh Pekerja 8,500 L.1
0.20 oh Tukang kayu 20,000 L.6
0.02 oh Kepala tukang 3,000 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-336 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu kamper 102,150 0.3 .
0.01 m3 Papan kayu kamper 68,475 M.1095
0.05 kg Paku Biasa 2" - 5" 1,250 M.111
0.10 oh Pekerja 8,500 L.1
0.20 oh Tukang kayu 20,000 L.6
0.02 oh Kepala tukang 3,000 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-337 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu kelas bengki 102,425 0.3 .
0.01 m3 Papan kayu bengkirai 68,750 M.1091
0.05 kg Paku Biasa 2" - 5" 1,250 M.111
0.10 oh Pekerja 8,500 L.1
0.20 oh Tukang kayu 20,000 L.6
0.02 oh Kepala tukang 3,000 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-338 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu kruing 83,175 0.3 .
0.01 m3 Papan kayu kruing 49,500 M.1097
0.05 kg Paku Biasa 2" - 5" 1,250 M.111
0.10 oh Pekerja 8,500 L.1
0.20 oh Tukang kayu 20,000 L.6
0.02 oh Kepala tukang 3,000 L.9
0.01 oh Mandor 925 L.10
SNI-2002 S-339 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu jati (klas 182,138 0.4 .
0.01 m3 Papan kayu jati (klas plitur) 137,750 M.1093
0.06 kg Paku biasa 2" - 5" 1,500 M.111
0.15 oh Pekerja 12,750 L.1
0.25 oh Tukang kayu 25,000 L.6
0.03 oh Kepala Tukang 3,750 L.9
0.01 oh Mandor 1,388 L.10
SNI-2002 S-340 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu jati (lok 182,138 0.4 .
0.01 m3 Papan kayu jati (lokal) 137,750 M.1094
0.06 kg Paku biasa 2" - 5" 1,500 M.111
0.15 oh Pekerja 12,750 L.1
0.25 oh Tukang kayu 25,000 L.6
0.03 oh Kepala Tukang 3,750 L.9
0.01 oh Mandor 1,388 L.10
SNI-2002 S-341 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu kamper 134,650 0.4 .
0.01 m3 Papan kayu kamper 90,263 M.1095
0.06 kg Paku biasa 2" - 5" 1,500 M.111
0.15 oh Pekerja 12,750 L.1
0.25 oh Tukang kayu 25,000 L.6
0.03 oh Kepala Tukang 3,750 L.9
0.01 oh Mandor 1,388 L.10
SNI-2002 S-342 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu bengkir 135,013 0.4 .

Software RAB Exarch xPro 154/396


0.01 m3 Papan kayu bengkirai 90,625 M.1091
0.06 kg Paku biasa 2" - 5" 1,500 M.111
0.15 oh Pekerja 12,750 L.1
0.25 oh Tukang kayu 25,000 L.6
0.03 oh Kepala Tukang 3,750 L.9
0.01 oh Mandor 1,388 L.10
SNI-2002 S-343 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu kruing 109,638 0.4 .
0.01 m3 Papan kayu kruing 65,250 M.1097
0.06 kg Paku biasa 2" - 5" 1,500 M.111
0.15 oh Pekerja 12,750 L.1
0.25 oh Tukang kayu 25,000 L.6
0.03 oh Kepala Tukang 3,750 L.9
0.01 oh Mandor 1,388 L.10
SNI-2002 S-344 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu jati (klas 104,125 0.2 .
0.01 m3 Papan kayu jati (klas plitur) 81,700 M.1093
0.06 kg Paku biasa 2" - 5" 1,500 M.111
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
SNI-2002 S-345 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu jati (lok 104,125 0.2 .
0.01 m3 Papan kayu jati (lokal) 81,700 M.1094
0.06 kg Paku biasa 2" - 5" 1,500 M.111
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
SNI-2002 S-346 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu kamper 75,960 0.2 .
0.01 m3 Papan kayu kamper 53,535 M.1095
0.06 kg Paku biasa 2" - 5" 1,500 M.111
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
SNI-2002 S-347 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu bengkir 76,175 0.2 .
0.01 m3 Papan kayu bengkirai 53,750 M.1091
0.06 kg Paku biasa 2" - 5" 1,500 M.111
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
SNI-2002 S-348 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu kruing 61,125 0.2 .
0.01 m3 Papan kayu kruing 38,700 M.1097
0.06 kg Paku biasa 2" - 5" 1,500 M.111
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
AK-SNI 2008 S-349 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu jati (klas pl 79,425 0.2 .
0.01 m3 Papan kayu jati (klas plitur) 57,000 M.1093
0.06 kg Paku biasa 2" - 5" 1,500 M.111
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
AK-SNI 2008 S-350 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu jati (lokal 79,425 0.2 .
0.01 m3 Papan kayu jati (lokal) 57,000 M.1094
0.06 kg Paku biasa 2" - 5" 1,500 M.111
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10

Software RAB Exarch xPro 155/396


AK-SNI 2008 S-351 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu kamper 59,775 0.2 .
0.01 m3 Papan kayu kamper 37,350 M.1095
0.06 kg Paku biasa 2" - 5" 1,500 M.111
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
AK-SNI 2008 S-352 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu bengkirai 59,925 0.2 .
0.01 m3 Papan kayu bengkirai 37,500 M.1091
0.06 kg Paku biasa 2" - 5" 1,500 M.111
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
AK-SNI 2008 S-353 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu kruing 49,425 0.2 .
0.01 m3 Papan kayu kruing 27,000 M.1097
0.06 kg Paku biasa 2" - 5" 1,500 M.111
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
AK-SNI 2008 S-354 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu jati (klas pl 68,025 0.2 .
0.00 m3 Papan kayu jati (klas plitur) 45,600 M.1093
0.06 kg Paku biasa 2" - 5" 1,500 M.111
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
AK-SNI 2008 S-355 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu jati (lokal) 68,025 0.2 .
0.00 m3 Papan kayu jati (lokal) 45,600 M.1094
0.06 kg Paku biasa 2" - 5" 1,500 M.111
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
AK-SNI 2008 S-356 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu kamper 52,305 0.2 .
0.00 m3 Papan kayu kamper 29,880 M.1095
0.06 kg Paku biasa 2" - 5" 1,500 M.111
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
AK-SNI 2008 S-357 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu bengkirai 52,425 0.2 .
0.00 m3 Papan kayu bengkirai 30,000 M.1091
0.06 kg Paku biasa 2" - 5" 1,500 M.111
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
AK-SNI 2008 S-358 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu kruing 44,025 0.2 .
0.00 m3 Papan kayu kruing 21,600 M.1097
0.06 kg Paku biasa 2" - 5" 1,500 M.111
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
AK-SNI 2008 S-359 1.00 m2 Membuat listplank asbes plat ram kayu jati (lokal) 490,000 2.6 .
0.03 m3 Ram kayu jati (lokal) 187,500 M.1099
1.00 m2 Asbes plat 34,000 M.1304
0.30 kg Paku reng 4,950 M.1137
0.60 oh Pekerja 51,000 L.1
1.80 oh Tukang kayu 180,000 L.6

Software RAB Exarch xPro 156/396


0.18 oh Kepala Tukang 27,000 L.9
0.03 oh Mandor 5,550 L.10
AK-SNI 2008 S-360 1.00 m2 Membuat listplank asbes plat ram kayu kamper 433,125 2.6 .
0.03 m3 Ram kayu kamper 130,625 M.1100
1.00 m2 Asbes plat 34,000 M.1304
0.30 kg Paku reng 4,950 M.1137
0.60 oh Pekerja 51,000 L.1
1.80 oh Tukang kayu 180,000 L.6
0.18 oh Kepala Tukang 27,000 L.9
0.03 oh Mandor 5,550 L.10
AK-SNI 2008 S-361 1.00 m2 Membuat listplank asbes plat ram kayu bengkirai 484,750 3.2 .
0.03 m3 Ram kayu bengkirai 131,250 M.1098
1.00 m2 Asbes plat 34,000 M.1304
0.30 kg Paku reng 4,950 M.1137
0.60 oh Pekerja 51,000 L.1
1.80 oh Tukang kayu 180,000 L.6
0.18 oh Kepala Tukang 27,000 L.9
0.60 oh Pekerja 51,000 L.1
0.03 oh Mandor 5,550 L.10
AK-SNI 2008 S-362 1.00 m2 Membuat listplank asbes plat ram kayu kruing 390,000 2.6 .
0.03 m3 Ram kayu kruing 87,500 M.1101
1.00 m2 Asbes plat 34,000 M.1304
0.30 kg Paku reng 4,950 M.1137
0.60 oh Pekerja 51,000 L.1
1.80 oh Tukang kayu 180,000 L.6
0.18 oh Kepala Tukang 27,000 L.9
0.03 oh Mandor 5,550 L.10
SNI-2007 S-363 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu jati 324,530 0.7 .
0.03 m3 Balok kayu jati (lokal) 254,800 M.1060
0.15 kg Paku Biasa 2" - 5" 3,750 M.111
0.15 oh Pekerja 12,750 L.1
0.45 oh Tukang kayu 45,000 L.6
0.05 oh Kepala tukang 6,750 L.9
0.01 oh Mandor 1,480 L.10
SNI-2007 S-364 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu k 244,030 0.7 .
0.03 m3 Balok kayu kamper 174,300 M.1061
0.15 kg Paku Biasa 2" - 5" 3,750 M.111
0.15 oh Pekerja 12,750 L.1
0.45 oh Tukang kayu 45,000 L.6
0.05 oh Kepala tukang 6,750 L.9
0.01 oh Mandor 1,480 L.10
SNI-2007 S-365 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu be 244,730 0.7 .
0.03 m3 Balok kayu bengkirai 175,000 M.1057
0.15 kg Paku Biasa 2" - 5" 3,750 M.111
0.15 oh Pekerja 12,750 L.1
0.45 oh Tukang kayu 45,000 L.6
0.05 oh Kepala tukang 6,750 L.9
0.01 oh Mandor 1,480 L.10
SNI-2007 S-366 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu k 195,730 0.7 .
0.03 m3 Balok kayu kruing 126,000 M.1063
0.15 kg Paku Biasa 2" - 5" 3,750 M.111
0.15 oh Pekerja 12,750 L.1
0.45 oh Tukang kayu 45,000 L.6
0.05 oh Kepala tukang 6,750 L.9
0.01 oh Mandor 1,480 L.10
SNI-2007 S-367 1.00 m2 Memasangdinding pemisah teakwood rangkap, rangka kayu 392,010 0.7 .
0.03 m3 Balok kayu jati (lokal) 254,800 M.1060
0.15 kg Paku Biasa 2" - 5" 3,750 M.111
0.86 lbr Teakwood 4 mm, 120 x 240 60,200 M.1323
0.56 kg Lem kayu 7,280 M.1493
0.15 oh Pekerja 12,750 L.1
0.45 oh Tukang kayu 45,000 L.6

Software RAB Exarch xPro 157/396


0.05 oh Kepala tukang 6,750 L.9
0.01 oh Mandor 1,480 L.10
SNI-2007 S-368 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka 311,510 0.7 .
0.03 m3 Balok kayu kamper 174,300 M.1061
0.15 kg Paku Biasa 2" - 5" 3,750 M.111
0.86 lbr Teakwood 4 mm, 120 x 240 60,200 M.1323
0.56 kg Lem kayu 7,280 M.1493
0.15 oh Pekerja 12,750 L.1
0.45 oh Tukang kayu 45,000 L.6
0.05 oh Kepala tukang 6,750 L.9
0.01 oh Mandor 1,480 L.10
SNI-2007 S-369 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka ka 312,210 0.7 .
0.03 m3 Balok kayu bengkirai 175,000 M.1057
0.15 kg Paku Biasa 2" - 5" 3,750 M.111
0.86 lbr Teakwood 4 mm, 120 x 240 60,200 M.1323
0.56 kg Lem kayu 7,280 M.1493
0.15 oh Pekerja 12,750 L.1
0.45 oh Tukang kayu 45,000 L.6
0.05 oh Kepala tukang 6,750 L.9
0.01 oh Mandor 1,480 L.10
SNI-2007 S-370 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka k 263,210 0.7 .
0.03 m3 Balok kayu kruing 126,000 M.1063
0.15 kg Paku Biasa 2" - 5" 3,750 M.111
0.86 lbr Teakwood 4 mm, 120 x 240 60,200 M.1323
0.56 kg Lem kayu 7,280 M.1493
0.15 oh Pekerja 12,750 L.1
0.45 oh Tukang kayu 45,000 L.6
0.05 oh Kepala tukang 6,750 L.9
0.01 oh Mandor 1,480 L.10
SNI-2007 S-371 1.00 m2 Memasang dinding pemisah plywood rangkap, rangka k 350,580 0.9 .
0.03 m3 Balok kayu kamper 174,300 M.1061
0.15 kg Paku Biasa 2" - 5" 3,750 M.111
0.86 lbr Plywood 120x240 tbl. 4 mm 77,400 M.58
0.56 kg Lem kayu 7,280 M.1493
0.20 oh Pekerja 17,000 L.1
0.60 oh Tukang kayu 60,000 L.6
0.06 oh Kepala tukang 9,000 L.9
0.01 oh Mandor 1,850 L.10
SNI-2007 S-372 1.00 m2 Memasang dinding pemisah plywood rangkap, rangka kay 351,280 0.9 .
0.03 m3 Balok kayu bengkirai 175,000 M.1057
0.15 kg Paku Biasa 2" - 5" 3,750 M.111
0.86 lbr Plywood 120x240 tbl. 4 mm 77,400 M.58
0.56 kg Lem kayu 7,280 M.1493
0.20 oh Pekerja 17,000 L.1
0.60 oh Tukang kayu 60,000 L.6
0.06 oh Kepala tukang 9,000 L.9
0.01 oh Mandor 1,850 L.10
SNI-2007 S-373 1.00 m2 Memasang dinding pemisah plywood rangkap, rangka ka 302,280 0.9 .
0.03 m3 Balok kayu kruing 126,000 M.1063
0.15 kg Paku Biasa 2" - 5" 3,750 M.111
0.86 lbr Plywood 120x240 tbl. 4 mm 77,400 M.58
0.56 kg Lem kayu 7,280 M.1493
0.20 oh Pekerja 17,000 L.1
0.60 oh Tukang kayu 60,000 L.6
0.06 oh Kepala tukang 9,000 L.9
0.01 oh Mandor 1,850 L.10
SNI-2007 S-374 1.00 m2 Memasang dinding lambriziring dari papan kayu jati (klas 334,650 2.6 .
0.01 m3 Papan kayu jati (klas plitur) 66,500 M.1093
0.10 kg Paku Biasa 2" - 5" 2,500 M.111
0.15 kg Paku skrup 10 cm 2,100 M.1140
0.60 oh Pekerja 51,000 L.1
1.80 oh Tukang kayu 180,000 L.6

Software RAB Exarch xPro 158/396


0.18 oh Kepala tukang 27,000 L.9
0.03 oh Mandor 5,550 L.10
SNI-2007 S-375 1.00 m2 Memasang dinding lambriziring dari papan kayu jati (lok 334,650 2.6 .
0.01 m3 Papan kayu jati (lokal) 66,500 M.1094
0.10 kg Paku Biasa 2" - 5" 2,500 M.111
0.15 kg Paku skrup 10 cm 2,100 M.1140
0.60 oh Pekerja 51,000 L.1
1.80 oh Tukang kayu 180,000 L.6
0.18 oh Kepala tukang 27,000 L.9
0.03 oh Mandor 5,550 L.10
SNI-2007 S-376 1.00 m2 Memasang dinding lambriziring dari papan kayu kamper 311,725 2.6 .
0.01 m3 Papan kayu kamper 43,575 M.1095
0.10 kg Paku Biasa 2" - 5" 2,500 M.111
0.15 kg Paku skrup 10 cm 2,100 M.1140
0.60 oh Pekerja 51,000 L.1
1.80 oh Tukang kayu 180,000 L.6
0.18 oh Kepala tukang 27,000 L.9
0.03 oh Mandor 5,550 L.10
SNI-2007 S-377 1.00 m2 Memasang dinding lambriziring dari papan kayu bengkir 311,900 2.6 .
0.01 m3 Papan kayu bengkirai 43,750 M.1091
0.10 kg Paku Biasa 2" - 5" 2,500 M.111
0.15 kg Paku skrup 10 cm 2,100 M.1140
0.60 oh Pekerja 51,000 L.1
1.80 oh Tukang kayu 180,000 L.6
0.18 oh Kepala tukang 27,000 L.9
0.03 oh Mandor 5,550 L.10
SNI-2007 S-378 1.00 m2 Memasang dinding lambriziring dari papan kayu kruing 299,650 2.6 .
0.01 m3 Papan kayu kruing 31,500 M.1097
0.10 kg Paku Biasa 2" - 5" 2,500 M.111
0.15 kg Paku skrup 10 cm 2,100 M.1140
0.60 oh Pekerja 51,000 L.1
1.80 oh Tukang kayu 180,000 L.6
0.18 oh Kepala tukang 27,000 L.9
0.03 oh Mandor 5,550 L.10
SNI-2007 S-379 1.00 m2 Memasang dinding lambriziring dari plywood ukuran (12 48,185 0.1 .
0.40 lbr Plywood 120x240 tbl. 4 mm 36,000 M.58
0.05 kg Paku Biasa ½" - 1" 1,175 M.110
0.03 oh Pekerja 2,125 L.1
0.08 oh Tukang kayu 7,500 L.6
0.01 oh Kepala tukang 1,200 L.9
0.00 oh Mandor 185 L.10
SNI-2007 S-380 1.00 m2 Memasang dinding bilik, rangka kayu kruing 207,475 0.2 .
1.50 m2 Bilik bambu 112,500 M.1308
0.01 m3 Kaso-kaso (5 x 7) cm kruing 63,000 M.1046
0.00 m3 List kayu 2/4 16,500 M.1027
0.01 kg Paku Biasa 2" - 5" 300 M.111
0.10 oh Pekerja 8,500 L.1
0.05 oh Tukang kayu 5,000 L.6
0.01 oh Kepala tukang 750 L.9
0.01 oh Mandor 925 L.10
AK-SNI 2008 S-381 1.00 m1 Mengerjakan papan ruiter kayu jati 2/20 (lokal) 50,339 0.1 .
0.00 m3 Papan kayu jati (lokal) 38,000 M.1094
0.02 kg Paku biasa 2" - 5" 500 M.111
0.03 oh Pekerja 2,380 L.1
0.08 oh Tukang kayu 8,000 L.6
0.01 oh Kepala Tukang 1,200 L.9
0.00 oh Mandor 259 L.10
AK-SNI 2008 S-382 1.00 m1 Mengerjakan papan ruiter kayu kamper 2/20 37,239 0.1 .
0.00 m3 Papan kayu kamper 24,900 M.1095
0.02 kg Paku biasa 2" - 5" 500 M.111
0.03 oh Pekerja 2,380 L.1
0.08 oh Tukang kayu 8,000 L.6

Software RAB Exarch xPro 159/396


0.01 oh Kepala Tukang 1,200 L.9
0.00 oh Mandor 259 L.10
AK-SNI 2008 S-383 1.00 m1 Mengerjakan papan ruiter kayu bengkirai 2/20 37,339 0.1 .
0.00 m3 Papan kayu bengkirai 25,000 M.1091
0.02 kg Paku biasa 2" - 5" 500 M.111
0.03 oh Pekerja 2,380 L.1
0.08 oh Tukang kayu 8,000 L.6
0.01 oh Kepala Tukang 1,200 L.9
0.00 oh Mandor 259 L.10
AK-SNI 2008 S-384 1.00 m1 Mengerjakan papan ruiter kayu kruing 2/20 30,339 0.1 .
0.00 m3 Papan kayu kruing 18,000 M.1097
0.02 kg Paku biasa 2" - 5" 500 M.111
0.03 oh Pekerja 2,380 L.1
0.08 oh Tukang kayu 8,000 L.6
0.01 oh Kepala Tukang 1,200 L.9
0.00 oh Mandor 259 L.10
SNI-2002 S-385 1.00 m2 Pasang plywood tebal 4 mm, untuk dinding 48,241 0.1 .
0.40 lbr Plywood 120x240 tbl. 4 mm 36,000 M.58
0.05 kg Paku biasa 2" - 5" 1,250 M.111
0.03 oh Pekerja 2,125 L.1
0.08 oh Tukang kayu 7,500 L.6
0.01 oh Kepala Tukang 1,125 L.9
0.00 oh Mandor 241 L.10
AK-SNI 2008 S-386 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu jati (loka 171,665 0.5 .
0.01 m3 Kayu jati (lokal) balok 90,000 M.1072
0.06 kg Paku Biasa 2" - 5" 1,500 M.111
1.10 lbr Asbes 1,00 x 1,00 m 26,400 M.1301
0.18 oh Pekerja 15,300 L.1
0.32 oh Tukang kayu 32,000 L.6
0.03 oh Kepala Tukang 4,800 L.9
0.01 oh Mandor 1,665 L.10
AK-SNI 2008 S-387 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kamper 156,365 0.5 .
0.01 m3 Kayu kamper balok 74,700 M.1073
0.06 kg Paku Biasa 2" - 5" 1,500 M.111
1.10 lbr Asbes 1,00 x 1,00 m 26,400 M.1301
0.18 oh Pekerja 15,300 L.1
0.32 oh Tukang kayu 32,000 L.6
0.03 oh Kepala Tukang 4,800 L.9
0.01 oh Mandor 1,665 L.10
AK-SNI 2008 S-388 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu bengkira 156,665 0.5 .
0.01 m3 Kayu bengkirai balok 75,000 M.1069
0.06 kg Paku Biasa 2" - 5" 1,500 M.111
1.10 lbr Asbes 1,00 x 1,00 m 26,400 M.1301
0.18 oh Pekerja 15,300 L.1
0.32 oh Tukang kayu 32,000 L.6
0.03 oh Kepala Tukang 4,800 L.9
0.01 oh Mandor 1,665 L.10
AK-SNI 2008 S-389 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kruing t 135,665 0.5 .
0.01 m3 Kayu kruing balok 54,000 M.1075
0.06 kg Paku Biasa 2" - 5" 1,500 M.111
1.10 lbr Asbes 1,00 x 1,00 m 26,400 M.1301
0.18 oh Pekerja 15,300 L.1
0.32 oh Tukang kayu 32,000 L.6
0.03 oh Kepala Tukang 4,800 L.9
0.01 oh Mandor 1,665 L.10
AK-SNI 2008 S-390 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu jati (lok 177,485 0.5 .
0.01 m3 Kayu jati (lokal) balok 90,000 M.1072
0.06 kg Paku Biasa 2" - 5" 1,500 M.111
1.10 lbr Asbes 1,00 x 1,00 m 26,400 M.1301
2.60 m1 Plepet kayu 5,460 M.1029
0.01 kg Paku eternit 195 M.1132
0.01 kg Paku plepet 165 M.1136

Software RAB Exarch xPro 160/396


0.18 oh Pekerja 15,300 L.1
0.32 oh Tukang kayu 32,000 L.6
0.03 oh Kepala Tukang 4,800 L.9
0.01 oh Mandor 1,665 L.10
AK-SNI 2008 S-391 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kamper 162,185 0.5 .
0.01 m3 Kayu kamper balok 74,700 M.1073
0.06 kg Paku Biasa 2" - 5" 1,500 M.111
1.10 lbr Asbes 1,00 x 1,00 m 26,400 M.1301
2.60 m1 Plepet kayu 5,460 M.1029
0.01 kg Paku eternit 195 M.1132
0.01 kg Paku plepet 165 M.1136
0.18 oh Pekerja 15,300 L.1
0.32 oh Tukang kayu 32,000 L.6
0.03 oh Kepala Tukang 4,800 L.9
0.01 oh Mandor 1,665 L.10
AK-SNI 2008 S-392 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu bengkir 162,485 0.5 .
0.01 m3 Kayu bengkirai balok 75,000 M.1069
0.06 kg Paku Biasa 2" - 5" 1,500 M.111
1.10 lbr Asbes 1,00 x 1,00 m 26,400 M.1301
2.60 m1 Plepet kayu 5,460 M.1029
0.01 kg Paku eternit 195 M.1132
0.01 kg Paku plepet 165 M.1136
0.18 oh Pekerja 15,300 L.1
0.32 oh Tukang kayu 32,000 L.6
0.03 oh Kepala Tukang 4,800 L.9
0.01 oh Mandor 1,665 L.10
AK-SNI 2008 S-393 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kruing 141,485 0.5 .
0.01 m3 Kayu kruing balok 54,000 M.1075
0.06 kg Paku Biasa 2" - 5" 1,500 M.111
1.10 lbr Asbes 1,00 x 1,00 m 26,400 M.1301
2.60 m1 Plepet kayu 5,460 M.1029
0.01 kg Paku eternit 195 M.1132
0.01 kg Paku plepet 165 M.1136
0.18 oh Pekerja 15,300 L.1
0.32 oh Tukang kayu 32,000 L.6
0.03 oh Kepala Tukang 4,800 L.9
0.01 oh Mandor 1,665 L.10
AK-SNI 2008 S-394 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 k 221,053 0.7 .
0.01 m3 Kayu jati (lokal) balok 97,500 M.1072
0.36 lbr Gypsum board 9 mm 31,320 M.56
0.05 roll Kasa gypsum 22,400 M.1480
0.45 kg Tepung gypsum 1,733 M.1026
0.00 kg Alkasit 135 M.1002
0.05 kg Paku gypsum 875 M.1133
0.12 kg Paku usuk 1,920 M.1144
0.24 oh Pekerja 20,400 L.1
0.37 oh Tukang kayu 37,000 L.6
0.04 oh Kepala Tukang 5,550 L.9
0.01 oh Mandor 2,220 L.10
AK-SNI 2008 S-395 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 204,478 0.7 .
0.01 m3 Kayu kamper balok 80,925 M.1073
0.36 lbr Gypsum board 9 mm 31,320 M.56
0.05 roll Kasa gypsum 22,400 M.1480
0.45 kg Tepung gypsum 1,733 M.1026
0.00 kg Alkasit 135 M.1002
0.05 kg Paku gypsum 875 M.1133
0.12 kg Paku usuk 1,920 M.1144
0.24 oh Pekerja 20,400 L.1
0.37 oh Tukang kayu 37,000 L.6
0.04 oh Kepala Tukang 5,550 L.9
0.01 oh Mandor 2,220 L.10
AK-SNI 2008 S-396 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 204,803 0.7 .

Software RAB Exarch xPro 161/396


0.01 m3 Kayu bengkirai balok 81,250 M.1069
0.36 lbr Gypsum board 9 mm 31,320 M.56
0.05 roll Kasa gypsum 22,400 M.1480
0.45 kg Tepung gypsum 1,733 M.1026
0.00 kg Alkasit 135 M.1002
0.05 kg Paku gypsum 875 M.1133
0.12 kg Paku usuk 1,920 M.1144
0.24 oh Pekerja 20,400 L.1
0.37 oh Tukang kayu 37,000 L.6
0.04 oh Kepala Tukang 5,550 L.9
0.01 oh Mandor 2,220 L.10
AK-SNI 2008 S-397 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 182,053 0.7 .
0.01 m3 Kayu kruing balok 58,500 M.1075
0.36 lbr Gypsum board 9 mm 31,320 M.56
0.05 roll Kasa gypsum 22,400 M.1480
0.45 kg Tepung gypsum 1,733 M.1026
0.00 kg Alkasit 135 M.1002
0.05 kg Paku gypsum 875 M.1133
0.12 kg Paku usuk 1,920 M.1144
0.24 oh Pekerja 20,400 L.1
0.37 oh Tukang kayu 37,000 L.6
0.04 oh Kepala Tukang 5,550 L.9
0.01 oh Mandor 2,220 L.10
AK-SNI 2008 S-398 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka hollow 227,995 0.7 .
4.50 m1 Hollow 4/4 104,625 M.25
0.36 lbr Gypsum board 9 mm 31,320 M.56
0.05 roll Kasa gypsum 22,400 M.1480
0.45 kg Tepung gypsum 1,733 M.1026
0.00 kg Alkasit 135 M.1002
0.15 kg Paku sekrup 113 M.112
5.00 m1 Kawat penggantung 2,500 M.1129
0.24 oh Pekerja 20,400 L.1
0.37 oh Tukang kayu 37,000 L.6
0.04 oh Kepala Tukang 5,550 L.9
0.01 oh Mandor 2,220 L.10
AK-SNI 2008 S-399 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kay 213,853 0.7 .
0.01 m3 Kayu jati (lokal) balok 97,500 M.1072
0.36 lbr Kalsiboard 3.5 mm 24,120 M.1311
0.05 roll Kasa gypsum 22,400 M.1480
0.45 kg Tepung gypsum 1,733 M.1026
0.00 kg Alkasit 135 M.1002
0.05 kg Paku gypsum 875 M.1133
0.12 kg Paku usuk 1,920 M.1144
0.24 oh Pekerja 20,400 L.1
0.37 oh Tukang kayu 37,000 L.6
0.04 oh Kepala Tukang 5,550 L.9
0.01 oh Mandor 2,220 L.10
AK-SNI 2008 S-400 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 197,278 0.7 .
0.01 m3 Kayu kamper balok 80,925 M.1073
0.36 lbr Kalsiboard 3.5 mm 24,120 M.1311
0.05 roll Kasa gypsum 22,400 M.1480
0.45 kg Tepung gypsum 1,733 M.1026
0.00 kg Alkasit 135 M.1002
0.05 kg Paku gypsum 875 M.1133
0.12 kg Paku usuk 1,920 M.1144
0.24 oh Pekerja 20,400 L.1
0.37 oh Tukang kayu 37,000 L.6
0.04 oh Kepala Tukang 5,550 L.9
0.01 oh Mandor 2,220 L.10
AK-SNI 2008 S-401 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 k 197,603 0.7 .
0.01 m3 Kayu bengkirai balok 81,250 M.1069
0.36 lbr Kalsiboard 3.5 mm 24,120 M.1311

Software RAB Exarch xPro 162/396


0.05 roll Kasa gypsum 22,400 M.1480
0.45 kg Tepung gypsum 1,733 M.1026
0.00 kg Alkasit 135 M.1002
0.05 kg Paku gypsum 875 M.1133
0.12 kg Paku usuk 1,920 M.1144
0.24 oh Pekerja 20,400 L.1
0.37 oh Tukang kayu 37,000 L.6
0.04 oh Kepala Tukang 5,550 L.9
0.01 oh Mandor 2,220 L.10
AK-SNI 2008 S-402 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 k 174,853 0.7 .
0.01 m3 Kayu kruing balok 58,500 M.1075
0.36 lbr Kalsiboard 3.5 mm 24,120 M.1311
0.05 roll Kasa gypsum 22,400 M.1480
0.45 kg Tepung gypsum 1,733 M.1026
0.00 kg Alkasit 135 M.1002
0.05 kg Paku gypsum 875 M.1133
0.12 kg Paku usuk 1,920 M.1144
0.24 oh Pekerja 20,400 L.1
0.37 oh Tukang kayu 37,000 L.6
0.04 oh Kepala Tukang 5,550 L.9
0.01 oh Mandor 2,220 L.10
AK-SNI 2008 S-403 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka hollow 220,795 0.7 .
4.50 m1 Hollow 4/4 104,625 M.25
0.36 lbr Kalsiboard 3.5 mm 24,120 M.1311
0.05 roll Kasa gypsum 22,400 M.1480
0.45 kg Tepung gypsum 1,733 M.1026
0.00 kg Alkasit 135 M.1002
0.15 kg Paku sekrup 113 M.112
5.00 m1 Kawat penggantung 2,500 M.1129
0.24 oh Pekerja 20,400 L.1
0.37 oh Tukang kayu 37,000 L.6
0.04 oh Kepala Tukang 5,550 L.9
0.01 oh Mandor 2,220 L.10
SNI-2007 S-404 1.00 m2 Memasang langit-langit asbes semen, tebal 4 mm 32,970 0.1 .
1.10 m2 Asbes semen tebal 4 mm 21,450 M.1305
0.01 kg Paku tripleks 180 M.1143
0.03 oh Pekerja 2,550 L.1
0.07 oh Tukang kayu 7,000 L.6
0.01 oh Kepala tukang 1,050 L.9
0.00 oh Mandor 740 L.10
SNI-2007 S-405 1.00 m2 Memasang langit-langit asbes semen, tebal 5 mm 36,270 0.1 .
1.10 m2 Asbes semen tebal 5 mm 24,750 M.1306
0.01 kg Paku tripleks 180 M.1143
0.03 oh Pekerja 2,550 L.1
0.07 oh Tukang kayu 7,000 L.6
0.01 oh Kepala tukang 1,050 L.9
0.00 oh Mandor 740 L.10
SNI-2007 S-406 1.00 m2 Memasang langit-langit asbes semen, tebal 6 mm 39,020 0.1 .
1.10 m2 Asbes semen tebal 6 mm 27,500 M.1307
0.01 kg Paku tripleks 180 M.1143
0.03 oh Pekerja 2,550 L.1
0.07 oh Tukang kayu 7,000 L.6
0.01 oh Kepala tukang 1,050 L.9
0.00 oh Mandor 740 L.10
SNI-2007 S-407 1.00 m2 Memasang langit-langit akustik ukuran (30 x 30) cm 446,010 0.3 .
12.00 lbr Akustik ukuran 30 x 30 cm 420,000 M.1298
0.05 kg Paku tripleks 900 M.1143
0.12 oh Pekerja 10,200 L.1
0.12 oh Tukang kayu 12,000 L.6
0.01 oh Kepala tukang 1,800 L.9
0.01 oh Mandor 1,110 L.10
SNI-2007 S-408 1.00 m2 Memasang langit-langit akustik ukuran (30 x 60) cm 340,825 0.2 .

Software RAB Exarch xPro 163/396


5.80 lbr Akustik ukuran 30 x 60 cm 319,000 M.1299
0.05 kg Paku tripleks 900 M.1143
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala tukang 1,500 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-409 1.00 m2 Memasang langit-langit akustik ukuran (60 x 120) cm 213,825 0.2 .
1.50 lbr Akustik Uk. 60 cm x 120 cm 192,000 M.1297
0.05 kg Paku tripleks 900 M.1143
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala tukang 1,500 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-410 1.00 m2 Memasanglangit-langit tripleks ukuran (120 x 240) cm, t 53,340 0.2 .
0.38 lbr Tripleks 31,875 M.62
0.03 kg Paku tripleks 540 M.1143
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala tukang 1,500 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-411 1.00 m2 Memasanglangit-langit tripleks ukuran (120 x 240) cm, t 53,340 0.2 .
0.38 lbr Tripleks 31,875 M.62
0.03 kg Paku tripleks 540 M.1143
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala tukang 1,500 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-412 1.00 m2 Memasanglangit-langit tripleks ukuran (120 x 240) cm, t 53,340 0.2 .
0.38 lbr Tripleks 31,875 M.62
0.03 kg Paku tripleks 540 M.1143
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala tukang 1,500 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-413 1.00 m2 Memasang langit-langit lambriziring kayu, tebal 9 mm 220,080 1.7 .
0.02 m3 Kayu Papan 3/20 52,500 M.1084
0.01 kg Paku tripleks 180 M.1143
0.80 oh Pekerja 68,000 L.1
0.80 oh Tukang kayu 80,000 L.6
0.08 oh Kepala tukang 12,000 L.9
0.04 oh Mandor 7,400 L.10
SNI-2007 S-414 1.00 m2 Memasang langit-langit gypsum board ukuran (120x240x 46,926 0.2 .
0.36 lbr Gypsum board 9 mm 31,668 M.56
0.11 kg Paku sekrup 83 M.112
0.10 oh Pekerja 8,500 L.1
0.05 oh Tukang kayu 5,000 L.6
0.01 oh Kepala tukang 750 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-415 1.00 m2 Memasang langit-langit akustik ukuran (60 x 120) cm + 361,470 1.1 .
3.60 m’ Profil Alluminium "T" 43,920 M.1149
0.15 kg Kawat dia 4 mm 5,175 M.1121
1.05 bh Baut Ramset / Dina Bolt 15,750 M.109
1.50 lbr Akustik Uk. 60 cm x 120 cm 192,000 M.1297
0.50 oh Pekerja 42,500 L.1
0.50 oh Tukang kayu 50,000 L.6
0.05 oh Kepala tukang 7,500 L.9
0.03 oh Mandor 4,625 L.10
SNI-2007 S-416 1.00 m1 Memasang ist langit-langit kayu profil 13,819 0.1 .
1.05 m1 List kayu profil 3,014 M.140
0.01 kg Paku Biasa 2" - 5" 250 M.111
0.05 oh Pekerja 4,250 L.1
0.05 oh Tukang kayu 5,000 L.6

Software RAB Exarch xPro 164/396


0.01 oh Kepala tukang 750 L.9
0.00 oh Mandor 555 L.10
AK-SNI 2008 S-417 1.00 m1 Pasang list profil cornees gypsum lebar sampai 5 cm 47,623 0.2 .
1.10 m1 List profil cornees gypsum 29,700 M.1313
0.70 kg Tepung gypsum 2,695 M.1026
0.00 kg Alkasit 158 M.1002
0.11 oh Pekerja 9,563 L.1
0.04 oh Tukang kayu 3,750 L.6
0.00 oh Kepala Tukang 555 L.9
0.01 oh Mandor 1,203 L.10
AK-SNI 2008 S-418 1.00 m1 Pasang list profil cornees gypsum lebar 5 - 10 cm 48,337 0.2 .
1.10 m1 List profil cornees gypsum 29,700 M.1313
0.88 kg Tepung gypsum 3,369 M.1026
0.00 kg Alkasit 198 M.1002
0.11 oh Pekerja 9,563 L.1
0.04 oh Tukang kayu 3,750 L.6
0.00 oh Kepala Tukang 555 L.9
0.01 oh Mandor 1,203 L.10
AK-SNI 2008 S-419 1.00 m1 Pasang list profil cornees gypsum lebar lebih dari 10 cm 49,346 0.2 .
1.10 m1 List profil cornees gypsum 29,700 M.1313
1.05 kg Tepung gypsum 4,043 M.1026
0.01 kg Alkasit 239 M.1002
0.11 oh Pekerja 9,563 L.1
0.04 oh Tukang kayu 4,000 L.6
0.00 oh Kepala Tukang 600 L.9
0.01 oh Mandor 1,203 L.10
AK-SNI 2008 S-420 1.00 m2 Mengerjakan Ukiran Gaya Yogyakarta dengan kedalaman 3,468,970 22.0 .
1.00 lb Kertas 100 x 100 cm 5,600 M.1531
15.00 lbr Kerta karbon 57,000 M.1530
2.00 oh Tukang gambar 320,363 L.12
16.00 oh Tukang Ukir 2,562,903 L.17
1.00 oh Kepala Tukang 150,000 L.9
20.00 lbr Amplas 70,000 M.134
0.08 kg Dempul 3,104 M.1337
3.00 oh Tukang kayu 300,000 L.6
AK-SNI 2008 S-421 1.00 m3 Memasang usuk peniung, kayu jati (klas plitur) 10,919,000 30.5 .
1.20 m3 Balok kayu papan (klas plitur) 7,800,000 M.1064
1.25 kg Paku Biasa 2" - 5" 31,250 M.111
1.00 kg Lem kayu 13,000 M.1493
7.00 oh Pekerja 595,000 L.1
21.00 oh Tukang kayu 2,100,000 L.6
2.10 oh Kepala tukang 315,000 L.9
0.35 oh Mandor 64,750 L.10
SNI-2002 S-422 1.00 m2 Pasang Atap Genteng Palentong Kecil 85,430 0.2 .
25.00 bh Genteng palentong 62,500 M.1441
0.15 oh Pekerja 12,750 L.1
0.08 oh Tukang kayu 7,500 L.6
0.01 oh Kepala Tukang 1,200 L.9
0.01 oh Mandor 1,480 L.10
AK-SNI 2008 S-423 1.00 m2 Pasang genteng paris 50,350 0.3 .
25.00 bh Genteng paris 20,000 M.1443
0.20 oh Pekerja 17,000 L.1
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 1,850 L.10
AK-SNI 2008 S-424 1.00 m2 Pasang genteng beton besar Natural ( isi 9 / m2 ) 55,100 0.3 .
9.00 bh Genteng beton natural 24,750 M.1433
0.20 oh Pekerja 17,000 L.1
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 1,850 L.10
SNI-2002 S-425 1.00 m1 Pasang Genteng Bubung Palentong 85,930 0.6 .

Software RAB Exarch xPro 165/396


5.00 bh Genteng Bubung Palentong 10,000 M.1437
8.00 Kg Semen 10,400 M.12
0.03 m3 Pasir pasang 8,160 M.9
0.40 oh Pekerja 34,000 L.1
0.20 oh Tukang kayu 20,000 L.6
0.02 oh Kepala tukang 3,000 L.9
0.00 oh Mandor 370 L.10
SNI-2002 S-426 1.00 m1 Pasang Nok Genteng Beton 108,600 0.6 .
3.50 lbr Genteng Beton 9,450 M.1432
0.05 Kg Paku Biasa 2" - 5" 1,250 M.111
10.80 Kg Semen 14,040 M.12
0.03 m3 Pasir pasang 8,160 M.9
1.00 Kg Semen Warna 15,000 M.13
0.40 oh Pekerja 34,000 L.1
0.20 oh Tukang kayu 20,000 L.6
0.02 oh Kepala tukang 3,000 L.9
0.02 oh Mandor 3,700 L.10
AK-SNI 2008 S-427 1.00 m1 Pasang bubungan genteng paris 179,005 0.6 .
5.00 bh Bubungan genteng paris 105,000 M.1430
0.02 m3 Kapur pasang 7,448 M.1015
0.02 m3 Pasir pasang 3,876 M.9
1.52 kg Semen 1,981 M.12
0.40 oh Pekerja 34,000 L.1
0.20 oh Tukang batu 20,000 L.3
0.02 oh Kepala Tukang 3,000 L.9
0.02 oh Mandor 3,700 L.10
SNI-2002 S-428 1.00 m2 Pasang Atap Asbes Gelombang ( 2.50 x 0.92 m ) X 5mm 78,520 0.2 .
0.50 lbr Asbes Gelombang 55,000 M.1302
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
0.14 oh Pekerja 11,900 L.1
0.08 oh Tukang kayu 7,500 L.6
0.01 oh Kepala tukang 1,200 L.9
0.01 oh Mandor 1,480 L.10
SNI-2002 S-429 1.00 m2 Pasang Atap Asbes Gelombang ( 2.25 x 0.92 m ) X 5mm 89,520 0.2 .
0.60 lbr Asbes Gelombang 66,000 M.1302
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
0.14 oh Pekerja 11,900 L.1
0.08 oh Tukang kayu 7,500 L.6
0.01 oh Kepala tukang 1,200 L.9
0.01 oh Mandor 1,480 L.10
SNI-2002 S-430 1.00 m2 Pasang Atap Asbes Gelombang ( 2.00 x 0.92 m ) X 5mm 88,685 0.2 .
0.60 lbr Asbes Gelombang 66,000 M.1302
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
0.14 oh Pekerja 11,900 L.1
0.07 oh Tukang kayu 7,000 L.6
0.01 oh Kepala tukang 1,050 L.9
0.01 oh Mandor 1,295 L.10
SNI-2002 S-431 1.00 m2 Pasang Atap Asbes Gelombang ( 1.80 x 0.92 m ) X 5mm 105,185 0.2 .
0.75 lbr Asbes Gelombang 82,500 M.1302
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
0.14 oh Pekerja 11,900 L.1
0.07 oh Tukang kayu 7,000 L.6
0.01 oh Kepala tukang 1,050 L.9
0.01 oh Mandor 1,295 L.10
SNI-2002 S-432 1.00 m2 Pasang Atap Asbes Gelombang ( 300 x 1.05 m ) X 4mm 61,185 0.2 .
0.35 lbr Asbes Gelombang 38,500 M.1302
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
0.14 oh Pekerja 11,900 L.1
0.07 oh Tukang kayu 7,000 L.6
0.01 oh Kepala tukang 1,050 L.9
0.01 oh Mandor 1,295 L.10
SNI-2002 S-433 1.00 m2 Pasang Atap Asbes Gelombang ( 270 x 1.05 m ) X 4mm 68,885 0.2 .

Software RAB Exarch xPro 166/396


0.42 lbr Asbes Gelombang 46,200 M.1302
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
0.14 oh Pekerja 11,900 L.1
0.07 oh Tukang kayu 7,000 L.6
0.01 oh Kepala tukang 1,050 L.9
0.01 oh Mandor 1,295 L.10
SNI-2002 S-434 1.00 m2 Pasang Atap Asbes Gelombang ( 240 x 1.05 m ) X 4mm 70,785 0.2 .
0.44 lbr Asbes Gelombang 48,400 M.1302
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
0.14 oh Pekerja 11,900 L.1
0.07 oh Tukang kayu 6,700 L.6
0.01 oh Kepala tukang 1,050 L.9
0.01 oh Mandor 1,295 L.10
SNI-2002 S-435 1.00 m2 Pasang Atap Asbes Gelombang ( 210 x 1.05 m ) X 4mm 78,485 0.2 .
0.51 lbr Asbes Gelombang 56,100 M.1302
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
0.14 oh Pekerja 11,900 L.1
0.07 oh Tukang kayu 6,700 L.6
0.01 oh Kepala tukang 1,050 L.9
0.01 oh Mandor 1,295 L.10
SNI-2002 S-436 1.00 m2 Pasang Atap Asbes Gelombang ( 1.5 x 1.05 m ) X 4mm 110,385 0.2 .
0.80 lbr Asbes Gelombang 88,000 M.1302
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
0.14 oh Pekerja 11,900 L.1
0.07 oh Tukang kayu 6,700 L.6
0.01 oh Kepala tukang 1,050 L.9
0.01 oh Mandor 1,295 L.10
SNI-2002 S-437 1.00 m2 Pasang Atap Asbes Gelombang ( 3.00 x 1.08 m ) X 6mm 63,085 0.2 .
0.37 lbr Asbes Gelombang 40,700 M.1302
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
0.14 oh Pekerja 11,900 L.1
0.07 oh Tukang kayu 6,700 L.6
0.01 oh Kepala tukang 1,050 L.9
0.01 oh Mandor 1,295 L.10
SNI-2002 S-438 1.00 m2 Pasang Atap Asbes Gelombang ( 2.7 x 1.08 m ) X 6mm 64,185 0.2 .
0.38 lbr Asbes Gelombang 41,800 M.1302
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
0.14 oh Pekerja 11,900 L.1
0.07 oh Tukang kayu 6,700 L.6
0.01 oh Kepala tukang 1,050 L.9
0.01 oh Mandor 1,295 L.10
SNI-2002 S-439 1.00 m2 Pasang Atap Asbes Gelombang ( 2.4 x 1.08 m ) X 6mm 72,985 0.2 .
0.46 lbr Asbes Gelombang 50,600 M.1302
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
0.14 oh Pekerja 11,900 L.1
0.07 oh Tukang kayu 6,700 L.6
0.01 oh Kepala tukang 1,050 L.9
0.01 oh Mandor 1,295 L.10
SNI-2002 S-440 1.00 m2 Pasang Atap Asbes Gelombang ( 2.1 x 1.08 m ) X 6mm 76,285 0.2 .
0.49 lbr Asbes Gelombang 53,900 M.1302
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
0.14 oh Pekerja 11,900 L.1
0.07 oh Tukang kayu 6,700 L.6
0.01 oh Kepala tukang 1,050 L.9
0.01 oh Mandor 1,295 L.10
SNI-2002 S-441 1.00 m2 Pasang Atap Asbes Gelombang ( 1.80 x 1.08 m ) X 6mm 85,085 0.2 .
0.57 lbr Asbes Gelombang 62,700 M.1302
0.12 Kg Paku Pancing 60 x 230 1,440 M.1135
0.14 oh Pekerja 11,900 L.1
0.07 oh Tukang kayu 6,700 L.6
0.01 oh Kepala tukang 1,050 L.9
0.01 oh Mandor 1,295 L.10

Software RAB Exarch xPro 167/396


SNI-2002 S-442 1.00 m1 Pasang Nok Stel Gelombang 0.92m 271,930 0.2 .
2.40 lbr Nok Stel Gelombang 177,600 M.1452
6.00 Kg Paku Pancing 60 x 230 72,000 M.1135
0.08 oh Pekerja 7,140 L.1
0.13 oh Tukang kayu 12,500 L.6
0.01 oh Kepala tukang 1,950 L.9
0.00 oh Mandor 740 L.10
SNI-2002 S-443 1.00 m1 Pasang Nok Stel Gelombang 1.05m 249,730 0.2 .
2.10 lbr Nok Stel Gelombang 155,400 M.1452
6.00 Kg Paku sekrup 3,5" 72,000 M.1138
0.08 oh Pekerja 7,140 L.1
0.13 oh Tukang kayu 12,500 L.6
0.01 oh Kepala tukang 1,950 L.9
0.00 oh Mandor 740 L.10
SNI-2002 S-444 1.00 m1 Pasang Nok Stel Gelombang 1.08m 246,030 0.2 .
2.05 lbr Nok Stel Gelombang 151,700 M.1452
6.00 Kg Paku sekrup 3,5" 72,000 M.1138
0.08 oh Pekerja 7,140 L.1
0.13 oh Tukang kayu 12,500 L.6
0.01 oh Kepala tukang 1,950 L.9
0.00 oh Mandor 740 L.10
SNI-2002 S-445 1.00 m1 Pasang Nok Paten 0.92m 144,130 0.2 .
1.20 lbr Nok Paten 49,800 M.1449
6.00 Kg Paku sekrup 3,5" 72,000 M.1138
0.08 oh Pekerja 7,140 L.1
0.13 oh Tukang kayu 12,500 L.6
0.01 oh Kepala tukang 1,950 L.9
0.00 oh Mandor 740 L.10
SNI-2002 S-446 1.00 m1 Pasang Nok Paten 1.05m 144,130 0.2 .
1.20 lbr Nok Paten 49,800 M.1449
6.00 Kg Paku sekrup 3,5" 72,000 M.1138
0.08 oh Pekerja 7,140 L.1
0.13 oh Tukang kayu 12,500 L.6
0.01 oh Kepala tukang 1,950 L.9
0.00 oh Mandor 740 L.10
SNI-2002 S-447 1.00 m1 Pasang Nok Paten 1.08m 144,130 0.2 .
1.20 lbr Nok paten 49,800 M.1449
6.00 Kg Paku sekrup 3,5" 72,000 M.1138
0.08 oh Pekerja 7,140 L.1
0.13 oh Tukang kayu 12,500 L.6
0.01 oh Kepala Tukang 1,950 L.9
0.00 oh Mandor 740 L.10
SNI-2002 S-448 1.00 m1 Pasang Nok Stel rata 0.92m 158,690 0.3 .
1.10 lbr Nok Stel rata 60,500 M.1453
6.00 Kg Paku sekrup 3,5" 72,000 M.1138
0.10 oh Pekerja 8,500 L.1
0.15 oh Tukang kayu 15,000 L.6
0.01 oh Kepala tukang 1,950 L.9
0.00 oh Mandor 740 L.10
SNI-2002 S-449 1.00 m1 Pasang Nok Stel rata 1.05m 154,830 0.2 .
1.10 lbr Nok Stel rata 60,500 M.1453
6.00 Kg Paku sekrup 3,5" 72,000 M.1138
0.08 oh Pekerja 7,140 L.1
0.13 oh Tukang kayu 12,500 L.6
0.01 oh Kepala tukang 1,950 L.9
0.00 oh Mandor 740 L.10
SNI-2002 S-450 1.00 m2 Pasang Nok Atap Seng 32,525 0.1 .
0.30 lbr Seng Gelombang 3" x 6" BJLS 28 21,000 M.61
0.04 Kg Paku Biasa ½" - 1" 940 M.110
0.02 oh Pekerja 1,275 L.1
0.07 oh Tukang kayu 7,000 L.6
0.01 oh Kepala tukang 1,200 L.9

Software RAB Exarch xPro 168/396


0.01 oh Mandor 1,110 L.10
SNI-2002 S-451 1.00 m2 Pasang Atap Alluminium 184,555 0.1 .
1.05 m2 Atap Alluminium Gelombang tebal 0.55 173,250 M.1425
0.02 Kg Paku Hak Panjang 15cm 220 M.1134
0.02 oh Pekerja 1,275 L.1
0.08 oh Tukang kayu 7,500 L.6
0.01 oh Kepala tukang 1,200 L.9
0.01 oh Mandor 1,110 L.10
SNI-2002 S-452 1.00 m2 Pasang Nok Alluminium 209,490 1.1 .
1.20 m2 Nok standar 40 cm 18, swg 22 97,200 M.1450
0.04 Kg Paku Hak Panjang 15cm 440 M.1134
0.10 oh Pekerja 8,500 L.1
1.00 oh Tukang kayu 100,000 L.6
0.01 oh Kepala tukang 1,500 L.9
0.01 oh Mandor 1,850 L.10
SNI-2002 S-453 1.00 m2 Pasang Alluminium Foil / Sisalation 51,375 0.2 .
1.05 m2 Aluminium foil 31,395 M.1105
0.15 oh Pekerja 12,750 L.1
0.05 oh Tukang kayu 5,000 L.6
0.01 oh Kepala tukang 750 L.9
0.01 oh Mandor 1,480 L.10
SNI-2002 S-454 1.00 m2 Pasang Atap Genteng Aspal 118,325 0.5 .
6.90 lbr Genteng Aspal 19,320 M.1431
0.35 lbr Plywood 120x240 tbl. 4 mm 31,500 M.58
0.03 Kg Paku Biasa ½" - 1" 705 M.110
0.50 Bh Plastic Aerator 17,500 M.1319
0.20 oh Pekerja 17,000 L.1
0.30 oh Tukang kayu 30,000 L.6
0.00 oh Kepala tukang 450 L.9
0.01 oh Mandor 1,850 L.10
SNI-2002 S-455 1.00 m2 Pasang Atap Genteng Metal 69,385 0.3 .
1.02 lbr Genteng Metal 35,700 M.1440
0.20 Kg Paku Biasa 2" - 5" 5,000 M.111
0.20 oh Pekerja 17,000 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala tukang 1,500 L.9
0.00 oh Mandor 185 L.10
SNI-2002 S-456 1.00 m2 Pasang Atap Genteng Kodok / Glazzur 60,430 0.2 .
25.00 bh Genteng Kodok 37,500 M.1439
0.15 oh Pekerja 12,750 L.1
0.08 oh Tukang kayu 7,500 L.6
0.01 oh Kepala tukang 1,200 L.9
0.01 oh Mandor 1,480 L.10
SNI-2002 S-457 1.00 m2 Pasang Atap Genteng Palentong Super / Besar 63,130 0.2 .
12.00 bh Genteng Palentong Super 42,000 M.1442
0.15 oh Pekerja 12,750 L.1
0.06 oh Tukang kayu 6,000 L.6
0.01 oh Kepala tukang 900 L.9
0.01 oh Mandor 1,480 L.10
SNI-2002 S-458 1.00 m2 Pasang Atap Sirap 289,040 0.4 .
60.00 lbr Genteng Sirap 240,000 M.1444
0.20 Kg Paku Biasa ½" - 1" 4,700 M.110
0.17 oh Pekerja 14,110 L.1
0.25 oh Tukang kayu 25,000 L.6
0.03 oh Kepala tukang 3,750 L.9
0.01 oh Mandor 1,480 L.10
SNI-2002 S-459 1.00 m1 Pasang Genteng Bubung Kodok Glazzur 83,430 0.6 .
5.00 bh Genteng Bubung Kodok 7,500 M.1436
8.00 Kg Semen 10,400 M.12
0.03 m3 Pasir pasang 8,160 M.9
0.40 oh Pekerja 34,000 L.1
0.20 oh Tukang kayu 20,000 L.6

Software RAB Exarch xPro 169/396


0.02 oh Kepala tukang 3,000 L.9
0.00 oh Mandor 370 L.10
SNI-2002 S-460 1.00 m1 Pasang Genteng Bubung Palentong Besar 83,930 0.6 .
4.00 bh Genteng Bubung Palentong 8,000 M.1437
8.00 Kg Semen 10,400 M.12
0.03 m3 Pasir pasang 8,160 M.9
0.40 oh Pekerja 34,000 L.1
0.20 oh Tukang kayu 20,000 L.6
0.02 oh Kepala tukang 3,000 L.9
0.00 oh Mandor 370 L.10
SNI-2002 S-461 1.00 m1 Pasang Rooflight Fiberglass ( 180 x 90 ) cm 104,995 0.2 .
0.60 lbr Roof Light Fiberglass 82,800 M.1454
0.05 Kg Paku Biasa 2" - 5" 1,250 M.111
0.14 oh Pekerja 11,900 L.1
0.07 oh Tukang kayu 6,700 L.6
0.01 oh Kepala tukang 1,050 L.9
0.01 oh Mandor 1,295 L.10
SNI-2002 S-462 1.00 m1 Pasang Nok Genteng Aspal 103,910 0.4 .
2.00 lbr Nok Genteng Aspal 50,000 M.1445
0.05 Kg Paku Biasa ½" - 1" 1,175 M.110
0.00 m3 Balok Kayu Borneo 12,250 M.1058
0.13 oh Pekerja 10,625 L.1
0.25 oh Tukang kayu 25,000 L.6
0.03 oh Kepala tukang 3,750 L.9
0.01 oh Mandor 1,110 L.10
SNI-2002 S-463 1.00 m1 Pasang Nok Genteng Metal 120,180 0.4 .
1.10 lbr Nok Genteng Decra Bond 78,100 M.1447
0.05 Kg Paku Biasa ½" - 1" 1,175 M.110
0.25 oh Pekerja 21,250 L.1
0.15 oh Tukang kayu 15,000 L.6
0.02 oh Kepala tukang 2,250 L.9
0.01 oh Mandor 2,405 L.10
SNI-2002 S-464 1.00 m1 Pasang Nok Sirap 85,145 0.4 .
0.40 Lbr Seng Gelombang 3" x 6" BJLS 28 28,000 M.61
0.06 Kg Paku Biasa ½" - 1" 1,410 M.110
0.05 Kg Paku Biasa 2" - 5" 1,250 M.111
0.00 m3 Papan Kayu Borneo tebal 3cm 14,000 M.1092
0.13 oh Pekerja 10,625 L.1
0.25 oh Tukang kayu 25,000 L.6
0.03 oh Kepala tukang 3,750 L.9
0.01 oh Mandor 1,110 L.10
SNI-2002 S-465 1.00 m2 Pasang Atap Seng Gelombang 67,680 0.2 .
0.70 Lbr Seng Gelombang 3" x 6" BJLS 28 49,000 M.61
0.02 Kg Paku Biasa ½" - 1" 470 M.110
0.12 oh Pekerja 10,200 L.1
0.06 oh Tukang kayu 6,000 L.6
0.01 oh Kepala tukang 900 L.9
0.01 oh Mandor 1,110 L.10
AK-SNI 2008 S-466 1.00 m2 Pasang genteng paris untuk rumah tingkat 59,775 0.4 .
25.00 bh Genteng paris 20,000 M.1443
0.30 oh Pekerja 25,500 L.1
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala Tukang 1,500 L.9
0.02 oh Mandor 2,775 L.10
AK-SNI 2008 S-467 1.00 m2 Pasang genteng beton besar Natural ( isi 9 / m2 ) untuk 64,525 0.4 .
9.00 bh Genteng beton natural 24,750 M.1433
0.30 oh Pekerja 25,500 L.1
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala Tukang 1,500 L.9
0.02 oh Mandor 2,775 L.10
AK-SNI 2008 S-468 1.00 m2 Pasang genteng beton besar Warna ( isi 9 / m2 ) 57,350 0.3 .
9.00 bh Genteng beton Warna 27,000 M.1434

Software RAB Exarch xPro 170/396


0.20 oh Pekerja 17,000 L.1
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 1,850 L.10
AK-SNI 2008 S-469 1.00 m2 Pasang genteng beton besar Warna ( isi 9 / m2 ) untuk r 66,775 0.4 .
9.00 bh Genteng beton Warna 27,000 M.1434
0.30 oh Pekerja 25,500 L.1
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala Tukang 1,500 L.9
0.02 oh Mandor 2,775 L.10
AK-SNI 2008 S-470 1.00 m2 Pasang genteng keramik berglasir KIA, Kanmuri Natural 124,600 0.3 .
14.50 bh Genteng keramik KIA natural 94,250 M.1438
0.20 oh Pekerja 17,000 L.1
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 1,850 L.10
AK-SNI 2008 S-471 1.00 m2 Pasang genteng keramik berglasir KIA, Kanmuri Natural 79,650 0.4 .
14.50 bh Genteng beton natural 39,875 M.1433
0.30 oh Pekerja 25,500 L.1
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala Tukang 1,500 L.9
0.02 oh Mandor 2,775 L.10
AK-SNI 2008 S-472 1.00 m2 Pasang bubungan genteng beton Warna 162,005 0.6 .
4.00 bh Bubungan genteng beton warna 88,000 M.1429
0.02 m3 Kapur pasang 7,448 M.1015
0.02 m3 Pasir pasang 3,876 M.9
1.52 kg Semen 1,981 M.12
0.40 oh Pekerja 34,000 L.1
0.20 oh Tukang batu 20,000 L.3
0.02 oh Kepala Tukang 3,000 L.9
0.02 oh Mandor 3,700 L.10
AK-SNI 2008 S-473 1.00 m2 Pasang bubungan genteng keramik berglasir KIA, Kanmu 184,005 0.6 .
4.00 bh Bubungan gent.krmk KIA natural 110,000 M.1428
0.02 m3 Kapur pasang 7,448 M.1015
0.02 m3 Pasir pasang 3,876 M.9
1.52 kg Semen 1,981 M.12
0.40 oh Pekerja 34,000 L.1
0.20 oh Tukang batu 20,000 L.3
0.02 oh Kepala Tukang 3,000 L.9
0.02 oh Mandor 3,700 L.10
AK-SNI 2008 S-474 1.00 m2 Pasang atap metal gelombang 95,670 0.3 .
1.02 m2 Atap metal gelombang t 0.35 mm 62,985 M.1426
4.00 bh Paku/skrup atap anti karat 4,000 M.1145
0.20 oh Pekerja 17,000 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.00 oh Mandor 185 L.10
AK-SNI 2008 S-475 1.00 m1 Pasang nok genteng metal U type prima roof 123,330 0.4 .
1.10 bh Nok metal 81,400 M.1448
0.05 kg Paku anti karat 1,025 M.1131
0.25 oh Pekerja 21,250 L.1
0.15 oh Tukang kayu 15,000 L.6
0.02 oh Kepala Tukang 2,250 L.9
0.01 oh Mandor 2,405 L.10
AK-SNI 2008 S-476 1.00 m2 Pasang atap polikarbonat 271,188 1.1 .
1.05 m2 Polycarbonat 152,775 M.1320
7.00 kg Besi rangka 11,200 M.1116
9.00 bh Paku sekrup 6,750 M.112
0.50 oh Pekerja 42,500 L.1
0.50 oh Tukang besi 50,000 L.4
0.05 oh Kepala Tukang 7,500 L.9
0.00 oh Mandor 463 L.10

Software RAB Exarch xPro 171/396


SNI-2002 S-477 1.00 m2 Mengikis / Mengerok Permukaan Cat Tembok Lama 15,463 0.2 .
0.05 kg Soda api 2,250 M.1501
0.15 oh Pekerja 12,750 L.1
0.00 oh Mandor 463 L.10
SNI-2002 S-478 1.00 m2 Mengerok Karat Cat Lama Permukaan Baja dengan Car 13,773 0.2 .
0.05 kg Sabun 560 M.1500
0.15 oh Pekerja 12,750 L.1
0.00 oh Mandor 463 L.10
SNI-2002 S-479 1.00 m2 Mendempul dan Menggosok Kayu 12,566 0.1 .
0.08 kg Dempul 3,104 M.1337
0.02 kg Minyak cat 700 M.1346
0.01 kg Batu apung 299 M.1007
0.04 oh Pekerja 3,400 L.1
0.04 oh Tukang Cat 4,000 L.5
0.00 oh Kepala tukang 600 L.9
0.00 oh Mandor 463 L.10
SNI-2002 S-480 1.00 m2 Pengecatan Bidang Kayu Lama 31,798 0.2 .
0.15 kg Plamir 1,800 M.11
0.17 kg Cat Lapisan Dasar 4,760 M.1328
0.17 kg Cat kayu 10,200 M.72
0.07 oh Pekerja 5,950 L.1
0.08 oh Tukang Cat 7,500 L.5
0.01 oh Kepala tukang 1,125 L.9
0.00 oh Mandor 463 L.10
SNI-2002 S-481 1.00 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis 33,633 0.1 .
0.20 kg Cat meni 3,260 M.69
0.15 kg Plamir 1,800 M.11
0.17 kg Cat Lapisan Dasar 4,760 M.1328
0.26 kg Cat kayu 15,600 M.72
0.07 oh Pekerja 5,950 L.1
0.01 oh Tukang Cat 900 L.5
0.01 oh Kepala tukang 900 L.9
0.00 oh Mandor 463 L.10
SNI-2002 S-482 1.00 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis 48,333 0.2 .
0.20 kg Cat meni 3,260 M.69
0.15 kg Plamir 1,800 M.11
0.17 kg Cat Lapisan Dasar 4,760 M.1328
0.35 kg Cat kayu 21,000 M.72
0.07 oh Pekerja 5,950 L.1
0.11 oh Tukang Cat 10,500 L.5
0.00 oh Kepala tukang 600 L.9
0.00 oh Mandor 463 L.10
SNI-2002 S-483 1.00 m2 Pelaburan Bidang Kayu dengan Teak Oil 25,553 0.2 .
0.36 ltr Teak oil 5,940 M.1349
0.04 oh Pekerja 3,400 L.1
0.06 oh Tukang Cat 6,300 L.5
0.06 oh Kepala tukang 9,450 L.9
0.00 oh Mandor 463 L.10
SNI-2002 S-484 1.00 m2 Pelaburan Bidang Kayu dengan Pelitur 34,133 0.1 .
0.15 ltr Politur 5,250 M.1348
0.37 ltr Politur 13,020 M.1348
2.00 lbr Amplas 7,000 M.134
0.06 oh Tukang cat 6,000 L.5
0.02 oh Kepala Tukang 2,400 L.9
0.00 oh Mandor 463 L.10
SNI-2002 S-485 1.00 m2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter 12,585 0.1 .
0.35 ltr Residu 2,975 M.1499
0.10 oh Pekerja 8,500 L.1
0.01 oh Mandor 1,110 L.10
SNI-2002 S-486 1.00 m2 Pelaburan Bidang Kayu dengan Vernis 52,173 0.3 .
0.15 Ltr Vernis 17,250 M.1350
0.05 Kg Dempul 1,940 M.1337

Software RAB Exarch xPro 172/396


0.10 Lbr Amplas 350 M.134
0.01 Bh Kuas 170 M.138
0.16 oh Pekerja 13,600 L.1
0.16 oh Tukang Cat 16,000 L.5
0.02 oh Kepala tukang 2,400 L.9
0.00 oh Mandor 463 L.10
SNI-2002 S-487 1.00 m2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 22,508 0.1 .
0.10 Kg Plamir 1,200 M.11
0.10 Kg Cat Lapisan Dasar 2,800 M.1328
0.26 Kg Cat Penutup Tembok 9,100 M.1336
0.02 oh Pekerja 1,700 L.1
0.06 oh Tukang Cat 6,300 L.5
0.01 oh Kepala tukang 945 L.9
0.00 oh Mandor 463 L.10
SNI-2002 S-488 1.00 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat pe 17,333 0.1 .
0.12 kg Cat Lapisan Dasar 3,360 M.1328
0.18 lbr Cat Penutup Tembok 6,300 M.1336
0.03 oh Pekerja 2,380 L.1
0.04 oh Tukang Cat 4,200 L.5
0.00 oh Kepala tukang 630 L.9
0.00 oh Mandor 463 L.10
SNI-2002 S-489 1.00 m2 Melabur tembok dengan kalkarium 8,198 0.1 .
0.10 kg Kalkarium 525 M.1529
0.03 oh Pekerja 2,380 L.1
0.04 oh Tukang Cat 4,200 L.5
0.00 oh Kepala tukang 630 L.9
0.00 oh Mandor 463 L.10
SNI-2002 S-490 1.00 m2 Melabur Tembok dengan Kapur Sirih 18,495 0.2 .
0.10 Lbr Amplas 350 M.134
0.25 ikat Alang-alang 138 M.1001
0.00 m3 Perancah Kayu 2,700 A.13
0.15 Kg Kapur Sirih 1,980 M.1016
0.15 oh Pekerja 12,750 L.1
0.00 oh Tukang Cat 100 L.5
0.00 oh Kepala tukang 15 L.9
0.00 oh Mandor 463 L.10
SNI-2002 S-491 1.00 m2 Melabur Tembok Lama dengan Kapur Sirih ( untuk peme 11,098 0.0 .
0.00 m3 Perancah Kayu 2,700 A.13
0.30 Kg Kapur Sirih 3,960 M.1016
0.04 oh Pekerja 3,400 L.1
0.01 oh Tukang Cat 500 L.5
0.00 oh Kepala tukang 75 L.9
0.00 oh Mandor 463 L.10
SNI-2002 S-492 1.00 m2 Pengecatan Permukaan Baja dengan Meni Besi 29,720 0.3 .
0.10 Kg Meni besi 3,000 M.1342
0.01 Bh Kuas 170 M.138
0.02 oh Pekerja 1,700 L.1
0.20 oh Tukang Cat 20,000 L.5
0.02 oh Kepala tukang 3,000 L.9
0.01 oh Mandor 1,850 L.10
SNI-2002 S-493 1.00 m2 Pengecatan Permukaan Baja dengan Meni Besi dan Pera 54,383 0.5 .
0.10 Kg Meni besi 3,000 M.1342
0.01 Bh Kuas 170 M.138
0.00 m3 Perancah kayu 2,700 A.13
0.25 oh Pekerja 21,250 L.1
0.23 oh Tukang Cat 22,500 L.5
0.02 oh Kepala tukang 3,375 L.9
0.01 oh Mandor 1,388 L.10
SNI-2002 S-494 1.00 m2 Pemasangan Wall Paper 73,463 0.2 .
1.20 m3 Wallpaper 42,000 M.1325
0.20 Kg Perekat 9,000 M.1498
0.02 oh Pekerja 1,700 L.1

Software RAB Exarch xPro 173/396


0.20 oh Tukang Cat 20,000 L.5
0.00 oh Kepala tukang 300 L.9
0.00 oh Mandor 463 L.10
SNI-2002 S-495 1.00 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secar 17,907 0.0 .
0.10 Kg Meni ( Read Lead ) A 3,400 M.1340
0.10 Kg Meni ( Read Lead ) B 3,600 M.1341
0.04 Kg Alluminium C 1,024 M.1103
0.04 Kg Alluminium B 960 M.1102
0.01 Ltr Pengencer 350 M.1347
0.00 m3 Perancah Kayu 2,700 A.13
0.01 oh Pekerja 510 L.1
0.01 oh Tukang Cat 600 L.5
0.02 oh Kepala tukang 3,375 L.9
0.01 oh Mandor 1,388 L.10
SNI-2002 S-496 1.00 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secar 18,420 0.1 .
0.30 Kg Meni Besi 9,000 M.1342
0.01 oh Pekerja 510 L.1
0.06 oh Tukang Cat 6,000 L.5
0.01 oh Kepala tukang 1,800 L.9
0.01 oh Mandor 1,110 L.10
SNI-2002 S-497 1.00 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secar 223,140 1.8 .
0.11 Kg Cat Dasar Kayu/Besi 7,150 M.71
0.17 Kg Cat Antara 7,650 M.1327
0.08 Kg Cat Besi 3,840 M.70
0.50 oh Pekerja 42,500 L.1
0.80 oh Tukang Cat 80,000 L.5
0.30 oh Kepala tukang 45,000 L.9
0.20 oh Mandor 37,000 L.10
SNI-2002 S-498 1.00 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara 190,500 1.5 .
0.30 Kg Cat Dasar Kayu/Besi 19,500 M.71
0.40 oh Pekerja 34,000 L.1
0.70 oh Tukang Cat 70,000 L.5
0.20 oh Kepala tukang 30,000 L.9
0.20 oh Mandor 37,000 L.10
SNI-2002 S-499 1.00 m2 Mencuci Bidang Permukaan Tembok yang Pernah dicat 13,773 0.2 .
0.05 Kg Sabun 560 M.1500
0.15 oh Pekerja 12,750 L.1
0.00 oh Mandor 463 L.10
SNI-2002 S-500 1.00 m2 Mengerok Karat atau Cat Lama Permukaan Baja dgn Panca 852,500 4.5 .
40.00 Kg Pasir Silika 244,000 M.1021
10.00 Ltr Bahan Bakar 100,000 M.1489
1.60 oh Pekerja 136,000 L.1
1.60 oh Tukang Cat 160,000 L.5
0.80 oh Kepala tukang 120,000 L.9
0.50 oh Mandor 92,500 L.10
SNI-2002 S-501 1.00 m2 Menyabun Permukaan Tembok Lama 13,773 0.2 .
0.05 Kg Sabun 560 M.1500
0.15 oh Pekerja 12,750 L.1
0.00 oh Mandor 463 L.10
AK-SNI 2008 S-502 1.00 m2 Pengecatan tembok tidak terlindung dari panas dan huja 34,208 0.1 .
0.10 kg Cat alkali resisting primer 3,200 M.1326
0.36 kg Cat ICI Weathershield 21,600 M.1334
0.06 oh Tukang cat 6,300 L.5
0.01 oh Kepala Tukang 945 L.9
0.02 oh Pekerja 1,700 L.1
0.00 oh Mandor 463 L.10
AK-SNI 2008 S-503 1.00 m2 Pengecatan bidang besi ( 3 x ) 38,835 0.2 .
0.17 kg Cat meni 2,722 M.69
0.20 kg Cat besi 9,600 M.70
0.15 ltr Tinner 9,000 M.73
0.07 oh Pekerja 5,950 L.1
0.11 oh Tukang cat 10,500 L.5

Software RAB Exarch xPro 174/396


0.00 oh Kepala Tukang 600 L.9
0.00 oh Mandor 463 L.10
AK-SNI 2008 S-504 1.00 m2 Pengetiran kayu ( 2 x ) 12,400 0.1 .
0.35 kg Residu 2,975 M.1499
0.10 oh Pekerja 8,500 L.1
0.01 oh Mandor 925 L.10
AK-SNI 2008 S-505 1.00 m2 Pekerjaan cat duco 3 x 84,745 0.5 .
0.43 kg Cat duco 27,625 M.1332
0.06 ltr Tinner 3,420 M.73
0.20 oh Pekerja 17,000 L.1
0.10 lbr Amplas 350 M.134
0.30 oh Tukang cat 30,000 L.5
0.03 oh Kepala Tukang 4,500 L.9
0.01 oh Mandor 1,850 L.10
AK-SNI 2008 S-506 1.00 m2 Mengecat genteng 31,008 0.1 .
0.36 kg Cat ICI Weathershield 21,600 M.1334
0.02 oh Pekerja 1,700 L.1
0.06 oh Tukang cat 6,300 L.5
0.01 oh Kepala Tukang 945 L.9
0.00 oh Mandor 463 L.10
AK-SNI 2008 S-507 1.00 m2 Mengecat kerb 3 kali 73,195 0.5 .
0.43 kg Cat emco 17,850 M.1333
0.06 ltr Minyak cat 1,995 M.1346
0.20 oh Pekerja 17,000 L.1
0.30 oh Tukang cat 30,000 L.5
0.03 oh Kepala Tukang 4,500 L.9
0.01 oh Mandor 1,850 L.10
AK-SNI 2008 S-508 1.00 m2 Memasang Prodo Mas 24 karat 5,048,651 9.1 .
1.20 m2 Prodo 3,600,000 M.1534
0.12 kg Cat kayu 7,200 M.72
0.10 oh Tukang cat 10,000 L.5
8.00 oh Tukang Prodo 1,281,451 L.16
1.00 oh Kepala tukang 150,000 L.9
AK-SNI 2008 S-509 1.00 m2 Mengerjakan Cat Sungging 635,686 5.8 .
0.12 kg Cat meni 1,956 M.69
0.04 oh Tukang cat 4,000 L.5
0.00 oh Kepala Tukang 600 L.9
0.07 oh Pekerja 5,670 L.1
0.00 oh Mandor 611 L.10
0.43 kg Cat kayu 25,500 M.72
0.10 ltr Minyak cat 3,500 M.1346
5.00 oh Tukang cat 500,000 L.5
0.50 oh Kepala Tukang 75,000 L.9
0.20 oh Pekerja 17,000 L.1
0.01 oh Mandor 1,850 L.10
SNI-2002 S-510 1.00 bh Memasang Kloset Duduk / Monoblok 2,935,250 4.6 .
1.00 bh Kloset Duduk 2,500,000 M.43
0.06 Ls Perlengkapan Umum 15,000 A.4
3.30 oh Pekerja 280,500 L.1
1.10 oh Tukang batu 110,000 L.3
0.00 oh Kepala Tukang 150 L.9
0.16 oh Mandor 29,600 L.10
SNI-2002 S-511 1.00 bh Memasang Kloset Jongkok Porselen 749,950 4.2 .
1.00 bh Kloset Jongkok 250,000 M.44
6.00 kg Semen 7,800 M.12
0.01 m3 Pasir pasang 2,550 M.9
1.00 oh Pekerja 85,000 L.1
1.50 oh Tukang batu 150,000 L.3
1.50 oh Kepala Tukang 225,000 L.9
0.16 oh Mandor 29,600 L.10
SNI-2002 S-512 1.00 bh Memasang Kloset Jongkok Teraso 565,250 2.9 .
1.00 bh Kloset Jongkok 250,000 M.44

Software RAB Exarch xPro 175/396


7.00 bh Bata merah 4,550 M.2
6.00 kg Semen 7,800 M.12
0.01 m3 Pasir pasang 2,550 M.9
1.00 oh Pekerja 85,000 L.1
1.50 oh Tukang batu 150,000 L.3
0.30 oh Kepala Tukang 45,000 L.9
0.11 oh Mandor 20,350 L.10
SNI-2002 S-513 1.00 bh Memasang Urinoir 1,703,850 2.2 .
1.00 bh Urinoir 1,400,000 M.1166
0.30 Ls Perlengkapan Umum 75,000 A.4
6.00 kg Semen 7,800 M.12
0.01 m3 Pasir pasang 2,550 M.9
1.00 oh Pekerja 85,000 L.1
1.00 oh Tukang batu 100,000 L.3
0.10 oh Kepala Tukang 15,000 L.9
0.10 oh Mandor 18,500 L.10
SNI-2002 S-514 1.00 bh Memasang Wastafel 1,378,350 2.9 .
1.00 bh Wastafel 1,050,000 M.55
0.12 Ls Perlengkapan Umum 30,000 A.4
6.00 kg Semen 7,800 M.12
0.01 m3 Pasir pasang 2,550 M.9
1.20 oh Pekerja 102,000 L.1
1.45 oh Tukang batu 145,000 L.3
0.15 oh Kepala Tukang 22,500 L.9
0.10 oh Mandor 18,500 L.10
SNI-2002 S-515 1.00 bh Memasang Bak Mandi Fiberglass, volume 0.30 m³ 889,350 5.2 .
1.00 bh Bak fiberglass 320,000 M.1157
0.18 Ls Perlengkapan Umum 45,000 A.4
1.80 oh Pekerja 153,000 L.1
2.70 oh Tukang batu 270,000 L.3
0.54 oh Kepala Tukang 81,000 L.9
0.11 oh Mandor 20,350 L.10
SNI-2002 S-516 1.00 bh Memasang Badkip Porselen 316,250 2.1 .
1.00 bh Badkip 15,000 M.1523
0.20 Ls Perlengkapan Umum 50,000 A.4
1.00 oh Pekerja 85,000 L.1
0.08 oh Tukang batu 7,500 L.3
0.75 oh Kepala Tukang 112,500 L.9
0.25 oh Mandor 46,250 L.10
SNI-2002 S-517 1.00 bh Memasang Bak Fiberglass volume 1 m³ air 1,356,500 9.3 .
1.00 bh Bak fiberglass 320,000 M.1157
0.12 Ls Perlengkapan Umum 30,000 A.4
3.00 oh Pekerja 255,000 L.1
4.50 oh Tukang batu 450,000 L.3
0.90 oh Kepala Tukang 135,000 L.9
0.90 oh Mandor 166,500 L.10
SNI-2002 S-518 1.00 m1 Memasang Pipa Penyalur Air limbah jenis Pipa Tanah Ø 89,812 0.1 .
1.60 bh Pipa tanah 74,400 M.1164
0.68 kg Semen 884 M.12
0.01 m3 Pasir pasang 3,315 M.9
0.01 m3 Pasir urug 2,200 M.10
0.06 oh Pekerja 5,100 L.1
0.03 oh Tukang batu 3,000 L.3
0.00 oh Kepala Tukang 450 L.9
0.00 oh Mandor 463 L.10
SNI-2002 S-519 1.00 m1 Memasang Pipa Penyalur Air limbah jenis Pipa Tanah Ø 94,596 0.1 .
1.60 bh Pipa tanah 74,400 M.1164
0.87 Kg Semen 1,131 M.12
0.01 m3 Pasir pasang 3,570 M.9
0.01 m3 Pasir urug 2,800 M.10
0.08 oh Pekerja 6,800 L.1
0.04 oh Tukang batu 4,000 L.3

Software RAB Exarch xPro 176/396


0.00 oh Kepala Tukang 600 L.9
0.01 oh Mandor 1,295 L.10
SNI-2002 S-520 1.00 m1 Memasang Pipa Beton Ø 5 cm - 20 cm 116,321 0.2 .
1.10 bh Pipa beton 60,500 M.1162
16.00 bh Bata merah 10,400 M.2
3.92 kg Semen 5,096 M.12
0.06 m3 Pasir pasang 14,280 M.9
0.02 m3 Pasir urug 4,800 M.10
0.14 oh Pekerja 11,900 L.1
0.07 oh Tukang batu 7,000 L.3
0.01 oh Kepala Tukang 1,050 L.9
0.01 oh Mandor 1,295 L.10
SNI-2002 S-521 1.00 m1 Memasang Pipa Beton Ø 30 cm - 100 cm 375,410 0.6 .
1.10 bh Pipa beton 60,500 M.1162
330.00 bh Bata merah 214,500 M.2
10.30 kg Semen 13,390 M.12
0.06 m3 Pasir pasang 15,555 M.9
0.07 m3 Pasir urug 13,800 M.10
0.38 oh Pekerja 32,300 L.1
0.19 oh Tukang batu 19,000 L.3
0.02 oh Kepala Tukang 2,850 L.9
0.02 oh Mandor 3,515 L.10
SNI-2002 S-522 1.00 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (30 x 554,685 4.2 .
87.00 bh Bata merah 56,550 M.2
44.00 kg Semen 57,200 M.12
0.07 m3 Pasir pasang 17,850 M.9
0.07 m3 Kerikil 15,400 M.7
1.60 kg Besi beton 16,000 M.16
0.06 m3 Pasir beton 15,000 M.8
3.20 oh Pekerja 272,000 L.1
1.02 oh Tukang batu 101,500 L.3
0.00 oh Kepala Tukang 225 L.9
0.02 oh Mandor 2,960 L.10
SNI-2002 S-523 1.00 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (45 x 471,835 2.0 .
150.00 bh Bata merah 97,500 M.2
77.00 kg Semen 100,100 M.12
0.13 m3 Pasir pasang 33,150 M.9
0.02 m3 Kerikil 4,400 M.7
2.60 kg Besi beton 26,000 M.16
0.09 m3 Pasir beton 22,500 M.8
1.42 oh Pekerja 120,700 L.1
0.47 oh Tukang batu 47,300 L.3
0.05 oh Kepala Tukang 7,050 L.9
0.07 oh Mandor 13,135 L.10
SNI-2002 S-524 1.00 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (60 x 727,578 3.2 .
222.00 bh Bata merah 144,300 M.2
114.00 kg Semen 148,200 M.12
0.18 m3 Pasir pasang 46,920 M.9
0.03 m3 Kerikil 7,260 M.7
4.85 kg Besi beton 48,500 M.16
0.12 m3 Pasir beton 30,000 M.8
2.16 oh Pekerja 183,600 L.1
0.72 oh Tukang batu 72,000 L.3
0.07 oh Kepala Tukang 10,800 L.9
0.11 oh Mandor 19,980 L.10
0.10 oh Tukang Gali 16,018 L.19
SNI-2002 S-525 1.00 m1 Memasang Pipa Galvanis Ø ½" 52,135 0.2 .
1.20 m1 Pipa galvanis ½” 25,200 M.1170
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
0.05 oh Pekerja 4,590 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala Tukang 1,350 L.9

Software RAB Exarch xPro 177/396


0.03 oh Mandor 4,995 L.10
SNI-2002 S-526 1.00 m1 Memasang Pipa Galvanis Ø ¾" 58,135 0.2 .
1.20 m1 Pipa galvanis 3/4” 31,200 M.1171
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
0.05 oh Pekerja 4,590 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala Tukang 1,350 L.9
0.03 oh Mandor 4,995 L.10
SNI-2002 S-527 1.00 m1 Memasang Pipa Galvanis Ø 1" 74,935 0.2 .
1.20 m1 Pipa galvanis 1” 48,000 M.1172
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
0.05 oh Pekerja 4,590 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala Tukang 1,350 L.9
0.03 oh Mandor 4,995 L.10
SNI-2002 S-528 1.00 m1 Memasang Pipa Galvanis Ø 1½" 129,079 0.3 .
1.20 m1 Pipa galvanis 11/2” 91,200 M.1173
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
0.11 oh Pekerja 9,180 L.1
0.18 oh Tukang batu 18,000 L.3
0.02 oh Kepala Tukang 2,700 L.9
0.01 oh Mandor 999 L.10
SNI-2002 S-529 1.00 m1 Memasang Pipa Galvanis Ø 3" 157,879 0.3 .
1.20 m1 Pipa galvanis 3” 120,000 M.1174
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
0.11 oh Pekerja 9,180 L.1
0.18 oh Tukang batu 18,000 L.3
0.02 oh Kepala Tukang 2,700 L.9
0.01 oh Mandor 999 L.10
SNI-2002 S-530 1.00 m1 Memasang Pipa Galvanis Ø 4" 206,408 0.4 .
1.20 m1 Pipa galvanis 4” 160,800 M.1175
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
0.14 oh Pekerja 11,475 L.1
0.23 oh Tukang batu 22,500 L.3
0.02 oh Kepala Tukang 3,375 L.9
0.01 oh Mandor 1,258 L.10
SNI-2002 S-531 1.00 m1 Memasang Pipa PVC tipe AW Ø ½" 22,093 0.1 .
1.20 m1 Pipa PVC 1/2" 4,800 M.46
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
0.04 oh Pekerja 3,060 L.1
0.06 oh Tukang batu 6,000 L.3
0.01 oh Kepala Tukang 900 L.9
0.00 oh Mandor 333 L.10
SNI-2002 S-532 1.00 m1 Memasang Pipa PVC tipe AW Ø ¾" 23,893 0.1 .
1.20 m1 Pipa PVC 3/4" 6,600 M.50
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
0.04 oh Pekerja 3,060 L.1
0.06 oh Tukang batu 6,000 L.3
0.01 oh Kepala Tukang 900 L.9
0.00 oh Mandor 333 L.10
SNI-2002 S-533 1.00 m1 Memasang Pipa PVC tipe AW Ø 1" 24,493 0.1 .
1.20 m1 Pipa PVC 1” 7,200 M.47
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
0.04 oh Pekerja 3,060 L.1
0.06 oh Tukang batu 6,000 L.3
0.01 oh Kepala Tukang 900 L.9
0.00 oh Mandor 333 L.10
SNI-2002 S-534 1.00 m1 Memasang Pipa PVC tipe AW Ø 1½" 25,093 0.1 .
1.20 m1 Pipa PVC 11/2” 7,800 M.1168
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
0.04 oh Pekerja 3,060 L.1
0.06 oh Tukang batu 6,000 L.3

Software RAB Exarch xPro 178/396


0.01 oh Kepala Tukang 900 L.9
0.00 oh Mandor 333 L.10
SNI-2002 S-535 1.00 m1 Memasang Pipa PVC tipe AW Ø 2" 30,874 0.2 .
1.20 m1 Pipa PVC 2” 8,400 M.48
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
0.05 oh Pekerja 4,624 L.1
0.09 oh Tukang batu 9,000 L.3
0.01 oh Kepala Tukang 1,350 L.9
0.00 oh Mandor 500 L.10
SNI-2002 S-536 1.00 m1 Memasang Pipa PVC tipe AW Ø 2½" 26,293 0.1 .
1.20 m1 Pipa PVC 21/2” 9,000 M.1169
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
0.04 oh Pekerja 3,060 L.1
0.06 oh Tukang batu 6,000 L.3
0.01 oh Kepala Tukang 900 L.9
0.00 oh Mandor 333 L.10
SNI-2002 S-537 1.00 m1 Memasang Pipa PVC tipe AW Ø 3" 39,769 0.2 .
1.20 m1 Pipa PVC 3" 9,600 M.49
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
0.08 oh Pekerja 6,885 L.1
0.14 oh Tukang batu 13,500 L.3
0.01 oh Kepala Tukang 2,025 L.9
0.00 oh Mandor 759 L.10
SNI-2002 S-538 1.00 m1 Memasang Pipa PVC tipe AW Ø 4" 47,044 0.2 .
1.20 m1 Pipa PVC 4" 10,800 M.51
0.35 Ls Perlengkapan Umum Pipa 7,000 A.5
0.08 oh Pekerja 6,885 L.1
0.14 oh Kepala Tukang 20,250 L.9
0.01 oh Tukang batu 1,350 L.3
0.00 oh Mandor 759 L.10
SNI-2002 S-539 1.00 bh Memasang Bak Cuci Piring Stainles Steel 543,328 0.4 .
1.00 bh Bak cuci piring 430,000 M.1156
1.00 set Waterdrain 76,000 M.1167
0.03 oh Pekerja 2,550 L.1
0.30 oh Tukang batu 30,000 L.3
0.03 oh Kepala Tukang 4,500 L.9
0.00 oh Mandor 278 L.10
SNI-2002 S-540 1.00 bh Memasang Bak Cuci Piring Teraso 606,963 0.6 .
1.00 bh Bak cuci piring 430,000 M.1156
1.00 set Waterdrain 76,000 M.1167
20.00 kg Semen 26,000 M.12
0.05 m3 Pasir pasang 12,750 M.9
0.05 oh Pekerja 4,250 L.1
0.50 oh Tukang batu 50,000 L.3
0.05 oh Kepala Tukang 7,500 L.9
0.00 oh Mandor 463 L.10
SNI-2002 S-541 1.00 bh Memasang Kran Ø ¾" atau ½" 38,388 0.1 .
1.00 bh Kran air 25,000 M.45
0.03 bh Sealtape 113 M.144
0.01 oh Pekerja 850 L.1
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
SNI-2002 S-542 1.00 bh Memasang Floor Drain 73,275 0.1 .
1.00 bh Floor drain 60,000 M.41
0.01 oh Pekerja 850 L.1
0.10 oh Tukang batu 10,000 L.3
0.01 oh Kepala Tukang 1,500 L.9
0.01 oh Mandor 925 L.10
SNI-2002 S-543 1.00 bh Memasang Bak Mandi Teraso, volume 0.30 m3 480,700 3.0 .
1.00 bh Bak mandi teraso 186,000 M.1158
6.00 kg Semen 7,800 M.12

Software RAB Exarch xPro 179/396


0.01 m3 Pasir pasang 2,550 M.9
2.10 oh Pekerja 178,500 L.1
0.75 oh Tukang batu 75,000 L.3
0.07 oh Kepala Tukang 10,500 L.9
0.11 oh Mandor 20,350 L.10
SNI-2002 S-544 1.00 bh Memasang bak mandi batu bata volume 0,30 m3 3,693,000 9.6 .
240.00 bh Bata merah 156,000 M.2
120.00 Kg Semen 156,000 M.12
0.30 m3 Pasir pasang 76,500 M.9
360.00 bh Porselen (11 x 11) cm 2,340,000 M.1396
6.00 Kg Semen nat 54,000 M.1023
6.00 oh Pekerja 510,000 L.1
3.00 oh Tukang batu 300,000 L.3
0.30 oh Kepala Tukang 45,000 L.9
0.30 oh Mandor 55,500 L.10
SNI-2002 S-545 1.00 bh Membuat bak beton volume 1 m3 air 4,374,700 9.8 .
0.90 m3 Beton kedap air 268,200 M.1475
180.00 kg Besi beton 1,800,000 M.16
8.00 m2 Kayu cetakan 1,200,000 M.1030
5.00 m2 Ubin porselen 32,500 M.1410
0.10 Ls Perlengkapan Umum 25,000 A.4
3.50 oh Pekerja 297,500 L.1
4.50 oh Tukang batu 450,000 L.3
0.90 oh Kepala Tukang 135,000 L.9
0.90 oh Mandor 166,500 L.10
SNI-2007 S-546 1.00 kg Memasang besi profil 34,106 0.1 .
1.15 kg Besi profil 17,940 M.1115
0.06 oh Pekerja 5,100 L.1
0.06 oh Tukang las 9,611 L.14
0.01 oh Kepala tukang 900 L.9
0.00 oh Mandor 555 L.10
SNI-2007 S-547 100.00 kg Mengerjakan pekerjaan perakitan 83,575 0.2 .
1.00 lte Solar 8,500 M.1502
0.10 ltr Minyak pelumas 3,500 M.1496
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang besi 10,000 L.4
0.00 oh Kepala tukang 150 L.9
0.01 oh Mandor 925 L.10
0.80 Jam Sewa alat perakitan baja 52,000 A.21
SNI-2007 S-548 1.00 m2 Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, 761,930 2.3 .
15.00 kg Besi siku L 30.30.3 201,000 M.1117
32.80 kg Besi plat baja 334,560 M.1114
0.05 kg Kawat las listrik 6,750 M.137
1.05 oh Pekerja 89,250 L.1
1.05 oh Tukang besi 105,000 L.4
0.11 oh Kepala tukang 15,750 L.9
0.05 oh Mandor 9,620 L.10
SNI-2007 S-549 10.00 cm Mengerjakan pengelasan dengan las listrik 89,520 0.1 .
0.40 kg Kawat las listrik 54,000 M.137
0.30 ltr Solar 2,550 M.1502
0.04 ltr Minyak pelumas 1,400 M.1496
0.04 oh Pekerja 3,400 L.1
0.02 oh Tukang besi 2,000 L.4
0.00 oh Kepala tukang 300 L.9
0.00 oh Mandor 370 L.10
0.17 Jam Sewa alat las 25,500 A.6
SNI-2007 S-550 1.00 m2 Membuat rangka jendela besi square tube (25 x 5) cm 555,550 1.4 .
4.76 m1 Besi square tube 126,140 M.1118
4.52 m1 Besi lis kaca (1 x 1) cm 203,490 M.1113
20.00 cm Pengelasan 90,000 M.1533
0.65 oh Pekerja 55,250 L.1
0.65 oh Tukang besi 65,000 L.4

Software RAB Exarch xPro 180/396


0.07 oh Kepala tukang 9,750 L.9
0.03 oh Mandor 5,920 L.10
SNI-2007 S-551 1.00 m2 Memasang pintu rolling door besi 791,110 2.5 .
1.00 m2 Pintu gulung besi 550,000 M.1148
1.20 oh Pekerja 102,000 L.1
1.20 oh Tukang besi 120,000 L.4
0.12 oh Kepala tukang 18,000 L.9
0.01 oh Mandor 1,110 L.10
SNI-2007 S-552 1.00 m2 Memasang pintu lipat (Folding door) 592,070 0.9 .
1.00 m2 Pintu lipat 500,000 M.1522
0.44 oh Pekerja 37,400 L.1
0.44 oh Tukang besi 44,000 L.4
0.04 oh Kepala tukang 6,600 L.9
0.02 oh Mandor 4,070 L.10
SNI-2007 S-553 1.00 m2 Memasang sunscreen alluminium 349,540 1.0 .
1.00 m2 Sunscreen alumunium 250,000 M.1155
0.08 oh Pekerja 6,800 L.1
0.80 oh Tukang besi 80,000 L.4
0.08 oh Kepala tukang 12,000 L.9
0.00 oh Mandor 740 L.10
SNI-2007 S-554 1.00 m2 Memasang rolling door alluminium 729,250 2.2 .
1.00 m2 Rolling door alluminium 520,000 M.1152
1.00 oh Pekerja 85,000 L.1
1.00 oh Tukang besi 100,000 L.4
0.10 oh Kepala tukang 15,000 L.9
0.05 oh Mandor 9,250 L.10
SNI-2007 S-555 1.00 m1 Memasang kusen pintu alluminium 157,192 0.1 .
1.10 m1 Profil kusen alluminium 132,000 M.1150
2.00 bh Sekrup fixer 500 M.1154
0.06 Tube Sealant 13,080 M.1535
0.04 oh Pekerja 3,655 L.1
0.04 oh Tukang besi konstruksi 6,923 L.26
0.00 oh Kepala tukang 645 L.9
0.00 oh Mandor 389 L.10
SNI-2007 S-556 1.00 m2 Memasang pintu alluminium strip lebar 8 cm 924,722 0.2 .
4.40 m1 Profil kusen alluminium 528,000 M.1150
14.60 m1 Aluminium strip 373,760 M.1106
0.09 oh Pekerja 7,225 L.1
0.09 oh Tukang besi konstruksi 13,685 L.26
0.01 oh Kepala tukang 1,275 L.9
0.00 oh Mandor 777 L.10
SNI-2007 S-557 1.00 m2 Memasang pintu kaca rangka alluminium 2,349,360 0.2 .
4.40 m1 Pintu alluminium 1,980,000 M.1146
4.50 m1 Profil kaca 292,500 M.1472
0.27 tube Sealant 58,860 M.1535
0.09 oh Pekerja 7,225 L.1
0.09 oh Tukang besi 8,500 L.4
0.01 oh Kepala tukang 1,350 L.9
0.01 oh Mandor 925 L.10
SNI-2007 S-558 1.00 m2 Memasang venetions blinds dan Vertical blinds 148,330 0.8 .
1.00 m2 Venetions blinds dan vertical blinds (tirai) 75,000 M.1540
0.35 oh Pekerja 29,750 L.1
0.35 oh Tukang besi 35,000 L.4
0.04 oh Kepala tukang 5,250 L.9
0.02 oh Mandor 3,330 L.10
SNI-2007 S-559 1.00 m2 Memasang terali besi strip (2 x 3) mm 548,428 3.6 .
6.18 kg Baja strip (0,2 x 2) cm 77,213 M.15
27.08 cm Pengelasan 121,860 M.1533
1.67 oh Pekerja 141,950 L.1
1.67 oh Tukang besi 167,000 L.4
0.17 oh Kepala tukang 25,050 L.9
0.08 oh Mandor 15,355 L.10

Software RAB Exarch xPro 181/396


SNI-2007 S-560 1.00 m2 Memasang kawat nyamuk dengan plepet baja strip 105,570 0.2 .
1.10 m2 Kawat nyamuk 13,200 M.1128
11.11 cm Pengelasan 49,995 M.1533
1.72 kg Baja strip (0,2 x 2) cm 21,450 M.15
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang besi 10,000 L.4
0.01 oh Kepala tukang 1,500 L.9
0.01 oh Mandor 925 L.10
SNI-2002 S-561 1.00 m2 Pasang kawat nyamuk dengan plepet kayu 44,968 0.2 .
1.10 m2 Kawat nyamuk 13,200 M.1128
0.02 kg Paku Biasa ½" - 1" 470 M.110
0.00 m3 Kayu kamper papan 11,205 M.1080
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.00 oh Mandor 93 L.10
SNI-2007 S-562 1.00 m2 Memasang jendela nako & tralis 193,185 0.4 .
1.10 m2 Jendela nako (rangka + kaca 5 mm) 60,500 M.136
10.00 bh Paku skrup 1 cm – 2,5 cm 5,000 M.1139
7.00 m1 Baja strip (0,2 x 2) cm 87,500 M.15
0.20 oh Pekerja 17,000 L.1
0.20 oh Tukang besi 20,000 L.4
0.02 oh Kepala tukang 3,000 L.9
0.00 oh Mandor 185 L.10
SNI-2007 S-563 1.00 m1 Memasang talang 1/2 lingkaran D-15 cm, seng plat bjls 30 97,215 0.5 .
0.60 lbr Seng Gelombang 3" x 6" BJLS 28 42,000 M.61
0.01 kg Paku Biasa ½" - 1" 235 M.110
0.50 kg Baja strip (0,2 x 2) cm 6,250 M.15
0.15 oh Pekerja 12,750 L.1
0.30 oh Tukang besi 30,000 L.4
0.03 oh Kepala tukang 4,500 L.9
0.01 oh Mandor 1,480 L.10
SNI-2002 S-564 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu jati 192,534 0.6 .
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 35,000 M.61
0.02 kg Paku Biasa ½" - 1" 353 M.110
0.01 m3 Kayu jati papan 91,200 M.1078
0.25 kg Flincoat 9,250 M.1338
0.15 oh Pekerja 12,750 L.1
0.40 oh Tukang kayu 40,000 L.6
0.03 oh Kepala Tukang 3,750 L.9
0.00 oh Mandor 231 L.10
SNI-2002 S-565 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu jati (lokal 192,534 0.6 .
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 35,000 M.61
0.02 kg Paku Biasa ½" - 1" 353 M.110
0.01 m3 Kayu jati (lokal) papan 91,200 M.1077
0.25 kg Flincoat 9,250 M.1338
0.15 oh Pekerja 12,750 L.1
0.40 oh Tukang kayu 40,000 L.6
0.03 oh Kepala Tukang 3,750 L.9
0.00 oh Mandor 231 L.10
SNI-2002 S-566 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu kamper 161,094 0.6 .
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 35,000 M.61
0.02 kg Paku Biasa ½" - 1" 353 M.110
0.01 m3 Kayu kamper papan 59,760 M.1080
0.25 kg Flincoat 9,250 M.1338
0.15 oh Pekerja 12,750 L.1
0.40 oh Tukang kayu 40,000 L.6
0.03 oh Kepala Tukang 3,750 L.9
0.00 oh Mandor 231 L.10
SNI-2002 S-567 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu kruing 144,534 0.6 .
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 35,000 M.61
0.02 kg Paku Biasa ½" - 1" 353 M.110

Software RAB Exarch xPro 182/396


0.01 m3 Kayu kruing papan 43,200 M.1082
0.25 kg Flincoat 9,250 M.1338
0.15 oh Pekerja 12,750 L.1
0.40 oh Tukang kayu 40,000 L.6
0.03 oh Kepala Tukang 3,750 L.9
0.00 oh Mandor 231 L.10
SNI-2002 S-568 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu bengkirai 161,334 0.6 .
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 35,000 M.61
0.02 kg Paku Biasa ½" - 1" 353 M.110
0.01 m3 Kayu bengkirai papan 60,000 M.1076
0.25 kg Flincoat 9,250 M.1338
0.15 oh Pekerja 12,750 L.1
0.40 oh Tukang kayu 40,000 L.6
0.03 oh Kepala Tukang 3,750 L.9
0.00 oh Mandor 231 L.10
SNI-2002 S-569 1.00 m1 Pasang talang miring, seng BJLS 28 papan kayu jati (klas 304,734 0.5 .
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 35,000 M.61
0.02 kg Paku Biasa ½" - 1" 353 M.110
0.02 m3 Kayu jati papan (klas 1) 210,900 M.1079
0.30 kg Flincoat 11,100 M.1338
0.04 oh Pekerja 3,400 L.1
0.40 oh Tukang kayu 40,000 L.6
0.03 oh Kepala Tukang 3,750 L.9
0.00 oh Mandor 231 L.10
SNI-2002 S-570 1.00 m1 Pasang talang miring, seng BJLS 28, papan kayu jati (lok 272,484 0.5 .
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 35,000 M.61
0.02 kg Paku Biasa ½" - 1" 353 M.110
0.02 m3 Kayu jati (lokal) papan 180,500 M.1077
0.25 kg Flincoat 9,250 M.1338
0.04 oh Pekerja 3,400 L.1
0.40 oh Tukang kayu 40,000 L.6
0.03 oh Kepala Tukang 3,750 L.9
0.00 oh Mandor 231 L.10
SNI-2002 S-571 1.00 m1 Pasang talang miring, seng BJLS 28, papan kayu kamper 210,259 0.5 .
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 35,000 M.61
0.02 kg Paku Biasa ½" - 1" 353 M.110
0.02 m3 Kayu kamper papan 118,275 M.1080
0.25 kg Flincoat 9,250 M.1338
0.04 oh Pekerja 3,400 L.1
0.40 oh Tukang kayu 40,000 L.6
0.03 oh Kepala Tukang 3,750 L.9
0.00 oh Mandor 231 L.10
SNI-2002 S-572 1.00 m1 Pasang talang miring, seng BJLS 28, papan kayu kruing 177,484 0.5 .
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 35,000 M.61
0.02 kg Paku Biasa ½" - 1" 353 M.110
0.02 m3 Kayu kruing papan 85,500 M.1082
0.25 kg Flincoat 9,250 M.1338
0.04 oh Pekerja 3,400 L.1
0.40 oh Tukang kayu 40,000 L.6
0.03 oh Kepala Tukang 3,750 L.9
0.00 oh Mandor 231 L.10
SNI-2002 S-573 1.00 m1 Pasang talang miring, seng BJLS 28, papan kayu bengkir 210,734 0.5 .
0.50 lbr Seng Gelombang 3" x 6" BJLS 28 35,000 M.61
0.02 kg Paku Biasa ½" - 1" 353 M.110
0.02 m3 Kayu bengkirai papan 118,750 M.1076
0.25 kg Flincoat 9,250 M.1338
0.04 oh Pekerja 3,400 L.1
0.40 oh Tukang kayu 40,000 L.6
0.03 oh Kepala Tukang 3,750 L.9
0.00 oh Mandor 231 L.10
AK-SNI 2008 S-574 1.00 m1 Pasang talang torong 1,152,850 6.5 .
6.00 lbr Seng Gelombang 3" x 6" BJLS 28 420,000 M.61

Software RAB Exarch xPro 183/396


225.00 bh Paku sumbat 90,000 M.1142
2.25 oh Pekerja 191,250 L.1
3.75 oh Tukang besi 375,000 L.4
0.38 oh Kepala Tukang 56,250 L.9
0.11 oh Mandor 20,350 L.10
SNI-2002 S-575 1.00 m2 Pasang jendela besi 1,100,021 2.2 .
1.00 m2 Jendela besi 825,000 M.1513
1.05 oh Pekerja 89,250 L.1
1.05 oh Tukang besi konstruksi 169,050 L.26
0.11 oh Kepala Tukang 15,750 L.9
0.01 oh Mandor 971 L.10
SNI-2002 S-576 1.00 m2 Pasang jendela besi tahan api 1,124,180 2.3 .
1.00 m2 Jendela besi 825,000 M.1513
1.02 oh Pekerja 86,870 L.1
1.20 oh Tukang besi konstruksi 193,200 L.26
0.12 oh Kepala Tukang 18,000 L.9
0.01 oh Mandor 1,110 L.10
SNI-2002 S-577 1.00 m2 Pasang pintu alumunium 486,812 2.2 .
1.00 m2 Pintu alumunium 211,800 M.1147
1.05 oh Pekerja 89,250 L.1
1.05 oh Tukang besi konstruksi 169,050 L.26
0.11 oh Kepala Tukang 15,750 L.9
0.01 oh Mandor 962 L.10
SNI-2002 S-578 1.00 m2 Pasang kawat harmonika 77,968 0.2 .
1.10 m2 Kawat harmonika 46,200 M.1123
0.02 kg Paku Biasa ½" - 1" 470 M.110
0.00 m3 Kayu kamper papan 11,205 M.1080
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.00 oh Mandor 93 L.10
SNI-2002 S-579 1.00 m2 Pasang kawat kassa 44,968 0.2 .
1.10 m2 Kawat kassa 13,200 M.1125
0.02 kg Paku Biasa ½" - 1" 470 M.110
0.00 m3 Kayu kamper papan 11,205 M.1080
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.00 oh Mandor 93 L.10
SNI-2002 S-580 1.00 m2 Pasang kawat burung 48,818 0.2 .
1.10 m2 Kawat burung 17,050 M.1120
0.02 kg Paku Biasa ½" - 1" 470 M.110
0.00 m3 Kayu kamper papan 11,205 M.1080
0.10 oh Pekerja 8,500 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala Tukang 1,500 L.9
0.00 oh Mandor 93 L.10
SNI-2002 S-581 1.00 bh Pasang kunci Tanam Antik 324,655 0.7 .
1.00 bh kunci Tanam Antik 250,000 M.1519
0.06 oh Pekerja 5,100 L.1
0.60 oh Tukang kayu 60,000 L.6
0.06 oh Kepala tukang 9,000 L.9
0.00 oh Mandor 555 L.10
SNI-2002 S-582 1.00 bh Pasang kunci Tanam Biasa 183,275 0.5 .
1.00 bh Kunci tanam biasa 130,000 M.1520
0.01 oh Pekerja 850 L.1
0.50 oh Tukang kayu 50,000 L.6
0.01 oh Kepala tukang 1,500 L.9
0.01 oh Mandor 925 L.10
SNI-2002 S-583 1.00 bh Pasang kunci Tanam Kamar Mandi 101,638 0.5 .
1.00 bh Kunci tanam KM 50,000 M.1521
0.01 oh Pekerja 425 L.1

Software RAB Exarch xPro 184/396


0.50 oh Tukang kayu 50,000 L.6
0.01 oh Kepala tukang 750 L.9
0.00 oh Mandor 463 L.10
SNI-2002 S-584 1.00 bh Pasang kunci Silinder 126,221 0.5 .
1.00 bh Kunci silinder 75,000 M.1517
0.01 oh Pekerja 425 L.1
0.50 oh Tukang kayu 50,000 L.6
0.01 oh Kepala tukang 750 L.9
0.00 oh Mandor 46 L.10
SNI-2002 S-585 1.00 bh Pasang Engsel Pintu 35,664 0.2 .
1.00 bh Engsel pintu 17,000 M.125
0.02 oh Pekerja 1,275 L.1
0.15 oh Tukang kayu 15,000 L.6
0.02 oh Kepala tukang 2,250 L.9
0.00 oh Mandor 139 L.10
SNI-2002 S-586 1.00 bh Pasang Engsel Jendela Kupu - kupu 21,443 0.1 .
1.00 bh Engsel jendela 9,000 M.1511
0.01 oh Pekerja 850 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala tukang 1,500 L.9
0.00 oh Mandor 93 L.10
SNI-2002 S-587 1.00 bh Buah Pasang Engsel Angin 34,550 0.3 .
1.00 bh Engsel angin 8,000 M.1510
0.02 oh Pekerja 1,700 L.1
0.20 oh Tukang kayu 20,000 L.6
0.02 oh Kepala tukang 3,000 L.9
0.01 oh Mandor 1,850 L.10
SNI-2002 S-588 1.00 bh Pasang Spring Knip 26,164 0.2 .
1.00 bh Spring knip 7,500 M.1536
0.02 oh Pekerja 1,275 L.1
0.15 oh Tukang kayu 15,000 L.6
0.02 oh Kepala tukang 2,250 L.9
0.00 oh Mandor 139 L.10
SNI-2002 S-589 1.00 bh Pasang Kait angin 24,164 0.2 .
1.00 bh Kait angin 5,500 M.1119
0.02 oh Pekerja 1,275 L.1
0.15 oh Tukang kayu 15,000 L.6
0.02 oh Kepala tukang 2,250 L.9
0.00 oh Mandor 139 L.10
SNI-2002 S-590 1.00 bh Pasang Door Closer 312,213 0.6 .
1.00 bh Door closer 250,000 M.1507
0.05 oh Pekerja 4,250 L.1
0.50 oh Tukang kayu 50,000 L.6
0.05 oh Kepala tukang 7,500 L.9
0.00 oh Mandor 463 L.10
SNI-2002 S-591 1.00 bh Pasang kunci selot 74,885 0.2 .
1.00 bh Kunci slot 50,000 M.1518
0.02 oh Pekerja 1,700 L.1
0.20 oh Tukang kayu 20,000 L.6
0.02 oh Kepala tukang 3,000 L.9
0.00 oh Mandor 185 L.10
SNI-2002 S-592 1.00 bh Pasang pegangan pintu / door holder 159,213 0.6 .
1.00 bh Door holder 97,000 M.1508
0.05 oh Pekerja 4,250 L.1
0.50 oh Tukang kayu 50,000 L.6
0.05 oh Kepala tukang 7,500 L.9
0.00 oh Mandor 463 L.10
SNI-2002 S-593 1.00 bh Pasang door stop 110,443 0.1 .
1.00 bh Door stop 98,000 M.1509
0.01 oh Pekerja 850 L.1
0.10 oh Tukang kayu 10,000 L.6
0.01 oh Kepala tukang 1,500 L.9

Software RAB Exarch xPro 185/396


0.00 oh Mandor 93 L.10
SNI-2002 S-594 1.00 bh Pasang rel pintu dorong 274,655 0.7 .
1.00 bh Rel pintu dorong 200,000 M.1151
0.06 oh Pekerja 5,100 L.1
0.60 oh Tukang kayu 60,000 L.6
0.06 oh Kepala tukang 9,000 L.9
0.00 oh Mandor 555 L.10
SNI-2002 S-595 1.00 bh Pasang kunci lemari 43,106 0.3 .
1.00 bh Kunci lemari 12,000 M.1516
0.03 oh Pekerja 2,125 L.1
0.25 oh Tukang kayu 25,000 L.6
0.03 oh Kepala tukang 3,750 L.9
0.00 oh Mandor 231 L.10
SNI-2002 S-596 1.00 m2 Pasang kaca, tebal 3 mm 139,664 0.2 .
1.10 m2 Kaca polos 121,000 M.1467
0.02 oh Pekerja 1,275 L.1
0.15 oh Tukang kayu 15,000 L.6
0.02 oh Kepala tukang 2,250 L.9
0.00 oh Mandor 139 L.10
SNI-2002 S-597 1.00 m2 Pasang kaca, tebal 5 mm 139,664 0.2 .
1.10 m2 Kaca polos 121,000 M.1467
0.02 oh Pekerja 1,275 L.1
0.15 oh Tukang kayu 15,000 L.6
0.02 oh Kepala tukang 2,250 L.9
0.00 oh Mandor 139 L.10
SNI-2002 S-598 1.00 m2 Pasang kaca, tebal 8 mm 141,526 0.2 .
1.10 m2 Kaca polos 121,000 M.1467
0.02 oh Pekerja 1,403 L.1
0.17 oh Tukang kayu 16,500 L.6
0.02 oh Kepala tukang 2,475 L.9
0.00 oh Mandor 148 L.10
SNI-2002 S-599 1.00 m2 Pasang kaca buram, tebal 12 mm 196,106 0.3 .
1.10 m2 Kaca buram 12 mm 165,000 M.1463
0.03 oh Pekerja 2,125 L.1
0.25 oh Tukang kayu 25,000 L.6
0.03 oh Kepala tukang 3,750 L.9
0.00 oh Mandor 231 L.10
SNI-2002 S-600 1.00 m2 Pasang kaca cermin, tebal 5 mm 184,214 0.2 .
1.10 m2 Kaca cermin 5 mm 165,550 M.1464
0.02 oh Pekerja 1,275 L.1
0.15 oh Tukang kayu 15,000 L.6
0.02 oh Kepala tukang 2,250 L.9
0.00 oh Mandor 139 L.10
SNI-2002 S-601 1.00 m2 Pasang kaca cermin, tebal 6 mm 18,664 0.2 .
0.02 oh Pekerja 1,275 L.1
0.15 oh Tukang kayu 15,000 L.6
0.02 oh Kepala tukang 2,250 L.9
0.00 oh Mandor 139 L.10
SNI-2002 S-602 1.00 m2 Pasang kaca cermin, tebal 8 mm 186,076 0.2 .
1.10 m2 Kaca cermin 5 mm 165,550 M.1464
0.02 oh Pekerja 1,403 L.1
0.17 oh Tukang kayu 16,500 L.6
0.02 oh Kepala tukang 2,475 L.9
0.00 oh Mandor 148 L.10
SNI-2002 S-603 1.00 m2 Pasang kaca "wireglass", tebal 5 mm 277,164 0.2 .
1.10 m2 Kaca wire glass 258,500 M.1471
0.02 oh Pekerja 1,275 L.1
0.15 oh Tukang kayu 15,000 L.6
0.02 oh Kepala tukang 2,250 L.9
0.00 oh Mandor 139 L.10
SNI-2002 S-604 1.00 m2 Pasang kaca patri, tebal 5 mm 112,164 0.2 .
1.10 m2 Kaca patri 5mm 93,500 M.1466

Software RAB Exarch xPro 186/396


0.02 oh Pekerja 1,275 L.1
0.15 oh Tukang kayu 15,000 L.6
0.02 oh Kepala tukang 2,250 L.9
0.00 oh Mandor 139 L.10

Software RAB Exarch xPro 187/396


REKAP DATABASE ANALISA HARGA SATUAN PEKERJAAN ( AHSP )

ID AHS Unit Uraian Biaya


U-001 m2 Pembersihan lapangan dan perataan 17,750
U-002 m1 Pengukuran dan pemasangan Bouwplank 90,125
U-003 Unit Pembuatan Gudang Bahan Ukuran 3 m x3m tinggi 2.4 m 8,092,696
U-004 Unit Pembuatan Kantor Sementara/Bedeng Pekerja/Direksi Keet, 3x3-tinggi 2.4 m 8,147,696
U-005 unit Pos Jaga Bahan Kayu Ukuran 2x2x2-t 2.9m 3,522,798
U-006 m3 Penggalian tanah biasa sedalam 1 m 68,375
U-007 m3 Penggalian tanah biasa sedalam 2 m 84,825
U-008 m3 Pengurugan dengan pasir urug 267,350
U-009 m3 Urug tanah mendatangkan 219,350
U-010 m3 Pemadatan tanah tanah ( per 20 cm) 51,750
U-011 m3 Pemasangan batu kosong (anstamping) 504,765
U-012 m3 Pemasangan pondasi batu belah campuran 1SP : 3PP 913,900
U-013 m3 Pemasangan pondasi batu belah campuran 1SP : 5PP 843,145
U-014 m1 Memasang rollag bata , campuran spesi 1 PC : 3 PP 32,901
U-015 m2 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP 114,156
U-016 m2 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 5 PP 109,334
U-017 m2 Pasangan dinding batako 133,200
U-018 m2 Pemasangan plesteran 1SP : 3PP tebal 15mm. 61,499
U-019 m2 Pemasangan plesteran 1SP : 5PP tebal 15 mm 58,894
U-020 m2 Pemasangan acian. 34,575
U-021 m3 Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87 771,927
U-022 m3 Membuat beton mutu f’c = 7,4 MPa (K 100) 837,134
U-023 m3 Membuat beton mutu f’= 9,8 MPa (K 125) 869,631
U-024 m3 Membuat beton mutu f’= 12,2 MPa (K 150) 895,167
U-025 m3 Membuat beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66 925,258
U-026 m3 Membuat beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61 954,206
U-027 m3 Membuat beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58 975,620
U-028 m3 Membuat beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56 990,145
U-029 m3 Membuat beton mutu f’ = 24,0 MPa (K 275), slump (120 ± 20) mm, w/c = 0,53 1,015,198
U-030 m3 Membuat beton mutu f’c = 26,4 MPa (K 300), slump (120 ± 20) mm, w/c = 0,52 1,022,947
U-031 m3 Membuat beton mutu f’c = 28,8 MPa (K 325), slump (120 ± 20) mm, w/c = 0,49 1,103,209
U-032 m3 Membuat beton mutu f’c = 31,2 MPa (K 350), slump (120 ± 20) mm, w/c = 0,48 1,113,395
U-033 kg Pembesian dengan besi polos atau besi ulir 12,327
U-034 m2 (K3) Pemasangan bekisting untuk pondasi 182,985
U-035 m2 (K3) Pemasangan bekisting untuk sloof 194,485
U-036 m2 (K3) Pemasangan bekisting untuk kolom 369,055
U-037 m2 (K3) Pemasangan bekisting untuk balok 378,355
U-038 m2 (K3) Pemasangan bekisting untuk lantai 469,055
U-039 m2 (K3) Pemasangan bekisting untuk dinding 404,555
U-040 m2 (K3) Pemasangan bekisting untuk tangga 343,768
U-041 m2 Pemasangan lantai keramik artistik 10cm x 10cm atau 5cm x 20cm 234,097
U-042 m2 Pemasangan lantai keramik ukuran 20cm x 20cm 246,870
U-043 m2 Pemasangan lantai keramik ukuran 30cm x 30cm 252,950
U-044 m2 Pemasangan lantai ubin teralux marmer ukuran 40cm x40cm 192,070
U-045 m2 Pemasangan lantai ubin teralux marmer ukuran 60cm x60cm 292,875
U-046 m2 Pemasangan lantai marmer ukuran 100cm x 100cm 199,577
U-047 m2 Pemasangan dinding keramik 20cm x 40cm 278,255
U-048 m2 Pemasangan dinding keramik 20cm x 60cm 348,655
U-049 m2 Pemasangan dinding keramik 30cm x 60cm 388,655
U-050 m2 Pemasangan dinding keramik 40cm x 60cm 428,455
U-051 m2 Pemasangan dinding marmer 100cm x 100cm 486,160
U-052 m1 Pemasangan Plint Keramik 10cm x 30cm 38,952

Software RAB Exarch xPro 188/396


U-053 m1 Pemasangan Plint Keramik 10cm x 40cm 41,177
U-054 m1 Pemasangan Plint Keramik 10cm x 60cm 43,072
U-055 m1 Pemasangan Corner Rope Tile (Kuku Keramik) 32,935
U-056 m2 Pemasangan paving block natural tebal 6 cm 220,313
U-057 m1 Pemasangan pipa PVC tipe AW diameter 1/2” 22,130
U-058 m1 Pemasangan pipa PVC tipe AW diameter 3/4” 23,930
U-059 m1 Pemasangan pipa PVC tipe AW diameter 1” 24,530
U-060 m1 Pemasangan pipa PVC tipe AW diameter 3” 39,750
U-061 m1 Pemasangan pipa PVC tipe AW diameter 4” 40,950
U-062 bh Pemasangan closet duduk 2,936,600
U-063 bh Pemasangan closet jongkok 547,450
U-064 bh Pemasangan wastafel 1,370,950
U-065 bh Pasang bak cuci piring (Kitchen Sink) stainlessteel 545,825
U-066 bh Pemasangan floor drain 73,275
U-067 unit Septik Tank Single Kompartmen, 1.6x0.8x1.6-1.2m3 (5 org/3thn) 3,114,694
U-068 unit Septik Tank Double Kompartmen, 1.6x0.8x1.3 ,1.66m3 (10org/3thn) 3,094,090
U-069 Unit Pek. Pembuatan Sumur Resapan dengan Buis 80 cm, Kedalaman 1,5 m 1,492,503
U-070 unit Pekerjaan Pasangan Shower Mandi 516,625
U-071 unit Pekerjaan Pasangan Tangki Air 1,422,125
U-072 m2 Pek. rangka Plafon Hollow Galvanish, modul 60 x 120 cm 132,580
U-073 m2 Pemasangan langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm 46,926
U-074 m2 Pemasangan langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 53,340
U-075 m1 Pemasangan list langit-langit kayu profil 13,819
U-076 m2 Pemasangan List Plafond PVC 53,875
U-077 m2 (K3) Pemasangan atap pelana rangka atap baja canai dingin profil C75 258,104
U-078 m2 (K3) Pemasangan atap jurai rangka atap baja canai dingin profil C75 252,585
U-079 m2 Pemasangan PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP G 250,450
U-080 m2 Pemasangan genteng metal ukuran 80 x 100 atap pelana 178,985
U-081 m2 Pemasangan genteng metal ukuran 80 x 100 atap Jurai/Limas 257,385
U-082 m1 Pemasangan nok genteng metal 133,455
U-083 m1 Pemasangan lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II 128,885
U-084 m1 Pemasangan talang datar/ jurai seng bjls 28 lebar 90 cm 149,060
U-085 m1 Pemasangan talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm 97,230
U-086 m1 Pemasangan pipa PVC tipe AW diameter 1/2” 22,130
U-087 m1 Pemasangan pipa PVC tipe AW diameter 3/4” 23,930
U-088 m1 Pemasangan pipa PVC tipe AW diameter 1” 24,530
U-089 m1 Pemasangan pipa PVC tipe AW diameter 3” 39,750
U-090 m1 Pemasangan pipa PVC tipe AW diameter 4” 40,950
U-091 bh Pemasangan kran diameter ½” atau 3/4” 72,888
U-092 bh Pemasangan closet duduk 2,936,600
U-093 bh Pemasangan closet jongkok 547,450
U-094 bh Pemasangan wastafel 1,370,950
U-095 bh Pasang bak cuci piring (Kitchen Sink) stainlessteel 545,825
U-096 bh Pemasangan floor drain 73,275
U-097 unit Septik Tank Single Kompartmen, 1.6x0.8x1.6-1.2m3 (5 org/3thn) 3,061,603
U-098 unit Septik Tank Double Kompartmen, 1.6x0.8x1.3 ,1.66m3 (10org/3thn) 3,040,999
U-099 Unit Pek. Pembuatan Sumur Resapan dengan Buis 80 cm, Kedalaman 1,5 m 1,471,503
U-100 unit Pekerjaan Pasangan Shower Mandi 516,625
U-101 unit Pekerjaan Pasangan Tangki Air 1,422,125
U-102 Unit Pekerjaan Pasangan Box MCB 507,700
U-103 btg Pekerjaan Pasangan Pembumian (Grounding) 807,700
U-104 m1 Pekerjaan Instalasi Kabel NYM-3x2.5m2 18,260
U-105 m1 Pekerjaan Instalasi Kabel NYM 2x1,5 mm2 11,730
U-106 unit Pekerjaan Pasangan Colokan Listrik (Receiptackle) 42,190
U-107 Unit Pekerjaan Pasangan Fitting Lampu 35,770

Software RAB Exarch xPro 189/396


U-108 unit Pekerjaan Pasangan Saklar Lampu 36,770
U-109 unit Pekerjaan Pasangan Lampu 5 W 31,085
U-110 unit Pekerjaan Pasangan Lampu 15 W 46,085
U-111 unit Pekerjaan Pasangan Lampu 20 W 52,085
U-112 Ls Penyambungan Instalasi Listrik PLN 2,500,000
U-113 Ls Penyambungan Instalasi Air PDAM 2,300,000
U-114 m2 Pekerjaan Pekerjaan Plamir (1 Lapis) 15,000
U-115 m2 Pekerjaan Cat Anti Lumut dan Waterproofing 19,050
U-116 m2 Pengecatan tembok baru Interior ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penu 18,519
U-117 m2 Pengecatan tembok baru Exterior ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat pen 20,869
U-118 m2 Pengecatan Langit (langit-langit) 19,150
U-119 m2 Pengecatan permukaan baja/besi 30,133
U-120 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 42,685
U-121 unit Pekerjaan Pasangan Pintu utama type P1 2,341,000
U-122 unit Pekerjaan Pasangan Pintu Ruangan type P2 1,841,000
U-123 unit Pekerjaan Pasangan Pintu WC type P3 1,341,000
U-124 unit Pekerjaan Pasangan Jendela type J1 1,124,750
U-125 unit Pekerjaan Pasangan Jendela type J2 835,450
U-126 unit Pekerjaan Pasangan Jendela type J3 2,868,000
U-127 unit Pekerjaan Pasangan Lubang Angin/Roster 35,700
U-128 kg Pekerjaan perakitan baja siku 34,873
U-129 kg Pekerjaan Perakitan baja WF 32,859
U-130 cm Pemotongan Baja dengan Las Oxy Acetilene 14,303
U-131 cm Pemotongan Baja dengan Mesin Gerinda Potong 2,852
U-132 cm Penyambungan Pengelasan Busur Las Listrik (Arc Welding) 9,072
U-133 cm Penyambungan Pengelasan Las Gas (Gas Welding) 10,336
U-134 cm Pekerjaan Sambungan Dengan Solder (Pateri Lunak) 17,013
U-135 cm Pekerjaan Sambungan Dengan Brazing (Pateri Keras) 34,223
U-136 m2 Meratakan Permukaan Baja dengan Gerinda 104,934
U-137 unit Meja Beton Ukuran 2,6m x 1m 5,495,080
U-138 unit Pekerjaan Pasangan Pompa Air 957,700
U-139 unit Pekerjaan Pasangan Air Conditioner 4,812,190
U-140 unit Pekerjaan Pasangan Exhaust Fan 312,190
U-141 m2 Pembersihan Area Kerja Pasca Konstruksi 26,100
U-142 pohon Pekerjaan Menanam Pohon Perdu 560,350
U-143 m2 Pemasangan dinding batu tempel hitam 333,925
U-144 m1 Pek.Pembuatan Railing Stainless Steel, tinggi 1,2 m 643,933
U-145 m2 Analisa Satuan Pekerjaan Baja Ringan 208,163
U-146 m2 Pasang Kuda-kuda baja ringan + reng untuk atap asbes/spandek 194,450
U-147 m2 Pasang Kuda-kuda baja ringan + reng untuk atap genteng biasa/metal 213,950
U-148 m2 1m2-Pasang Atap Spandek Zincalume 100,410
U-149 m2 Pasang Nok Zincalume 48,610

P-001 m2 (K3) Pembuatan pagar sementara dari kayu tinggi 2 meter 272,149
P-002 m2 (K3) Pembuatan pagar sementara dari seng gelombang tinggi 2 meter 365,999
P-003 m2 Pembuatan pagar sementara dari kawat duri tinggi 1,8 meter 1,460,999
P-004 m1 Pengukuran dan pemasangan Bouwplank 73,525
P-005 m2 (K3) Pembuatan kantor sementara lantai plesteran 1,202,075
P-006 m2 (K3) Pembuatan rumah jaga (konstruksi kayu ) 1,361,250
P-007 m2 (K3) Pembuatan gudang semen dan bahan 1,211,225
P-008 m2 (K3) Pembuatan bedeng pekerja 1,235,725
P-009 m2 (K3) Pembersihan lapangan dan perataan 17,750
P-010 m2 (K3) Pembuatan steger/perancah dari bambu 351,102
P-011 m2 Pembuatan kotak adukan ukuran 40cm x50cm x25cm 170,600
P-012 m2 Pembuatan jalan sementara 157,475

Software RAB Exarch xPro 190/396


P-013 m2 Pembongkaran beton bertulang 236,549
P-014 m3 Pembongkaran dinding tembok bata 118,275
P-015 m2 Pemasangan pagar kawat jaring galvanis panjang 240 cm 27,814
P-016 m2 Pemasangan panel beton pracetak 5x50x240 cm 412,039
P-017 m3 Penggalian tanah biasa sedalam 1 m 68,375
P-018 m3 Penggalian tanah biasa sedalam 2 m 84,825
P-019 m3 Menggali tanah biasa sedalam 3 m 101,645
P-020 m3 Menggali tanah keras sedalam 1 m 90,920
P-021 m3 Menggali tanah cadas sedalam 1 m 138,600
P-022 m3 Menggali tanah lumpur sedalam 1 m 110,325
P-023 m2 Pengerjaan stripping tanah tebing setinggi 1 meter 5,175
P-024 m3 (K3) Pembuangan tanah sejauh 30 meter 29,900
P-025 m3 Pengurugan kembali galian tanah Tanah Biasa Sedalam 1 M 25,875
P-026 m3 (K3) Pemadatan tanah tanah ( per 20 cm) 51,750
P-027 m3 Pengurugan dengan pasir urug 267,350
P-028 m3 Pemasangan lapisan pudel campuran 1KP:3PP:7TL 406,692
P-029 m3 Pemasangan lapisan ijuk tebal 10 cm untuk bidang resapan 1,275,525
P-030 m3 Pengurugan sirtu padat 312,675
P-031 m3 Pemasangan pondasi batu belah campuran 1SP : 3PP 913,900
P-032 m3 Pemasangan pondasi batu belah campuran 1SP : 4PP 872,125
P-033 m3 Pemasangan pondasi batu belah campuran 1SP : 5PP 843,145
P-034 m3 Pemasangan pondasi batu belah campuran 1SP : 6PP 822,780
P-035 m3 Pemasangan pondasi batu belah campuran 1SP : 8PP 794,845
P-036 m3 Pemasangan pondasi batu belah campuran 1SP : 1KP : 2PP 895,420
P-037 m3 Pemasangan pondasi batu belah campuran 1 SP : 3 KP : 10 PP 784,350
P-038 m3 Pemasangan pondasi batu belah campuran ¼ SP : 1 KP : 4PP 760,599
P-039 m3 Pemasangan batu kosong (anstamping) 504,765
P-040 m3 (K3) Pemasangan pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% 2,273,660
P-041 m3 Pemasangan pondasi sumuran, diameter 100 cm 863,675
P-042 m3 Membuat beton mutu f’c = 7,4 MPa (K 100) 886,255
P-043 m3 Membuat beton mutu f’= 9,8 MPa (K 125) 915,655
P-044 m3 Membuat beton mutu f’= 12,2 MPa (K 150) 939,055
P-045 m3 Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87 822,400
P-046 m3 Membuat beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66 966,205
P-047 m3 Membuat beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61 993,055
P-048 m3 Membuat beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58 1,011,905
P-049 m3 Membuat beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56 1,026,105
P-050 m3 Membuat beton mutu f’ = 24,0 MPa (K 275), slump (120 ± 20) mm, w/c = 0,53 1,050,755
P-051 m3 Membuat beton mutu f’c = 26,4 MPa (K 300), slump (120 ± 20) mm, w/c = 0,52 1,058,355
P-052 m3 Membuat beton mutu f’c = 28,8 MPa (K 325), slump (120 ± 20) mm, w/c = 0,49 1,138,025
P-053 m3 Membuat beton mutu f’c = 31,2 MPa (K 350), slump (120 ± 20) mm, w/c = 0,48 1,148,075
P-054 m3 Membuat beton kedap air dengan strorox - 100 1,105,175
P-055 m1 Pemasangan PVC Waterstop lebar 150 mm 91,005
P-056 m1 Pemasangan PVC Waterstop lebar 200 mm 95,345
P-057 m1 Membuat PVC Waterstop lebar 230 mm - 320 mm 111,890
P-058 kg Pembesian dengan besi polos atau besi ulir 12,327
P-059 kg Pemasangan kabel presstressed polos/strands 11,791
P-060 kg Pemasangan jaring kawat baja (wiremesh) 13,214
P-061 m2 (K3) Pemasangan bekisting untuk pondasi 162,985
P-062 m2 (K3) Pemasangan bekisting untuk sloof 171,985
P-063 m2 (K3) Pemasangan bekisting untuk kolom 355,055
P-064 m2 (K3) Pemasangan bekisting untuk balok 365,555
P-065 m2 (K3) Pemasangan bekisting untuk lantai 455,055
P-066 m2 (K3) Pemasangan bekisting untuk dinding 397,555
P-067 m2 (K3) Pemasangan bekisting untuk tangga 334,768

Software RAB Exarch xPro 191/396


P-068 m2 Pemasangan jembatan untuk pengecoran beton 113,480
P-069 m3 Membuat pondasi beton bertulang (150 kg besi + bekisting) 3,595,000
P-070 m3 Membuat sloof beton bertulang (200 kg besi + bekisting) 4,388,505
P-071 m3 Membuat kolom beton bertulang (300 kg besi + bekisting) 7,607,255
P-072 m3 Membuat balok beton bertulang (200 kg besi + bekisting) 5,940,730
P-073 m3 Membuat kolom beton bertulang (150 kg besi + bekisting) 5,558,850
P-074 m3 Membuat dinding beton bertulang (150 kg besi + bekisting) 4,928,950
P-075 m3 Membuat dinding beton bertulang (200 kg besi + bekisting) 5,507,455
P-076 m1 Membuat kolom praktis beton bertulang (11 x 11) cm 131,870
P-077 m1 Membuat ring balok beton bertulang (10 x 15) cm 150,095
P-078 m2 (K3) Pembuatan lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) slump (120 77,327
P-079 m2 (K3) Pembuatan lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump (12 96,645
P-080 m2 (K3) Pembuatan lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (120 106,798
P-081 m2 (K3) Pembuatan lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump (120 145,020
P-082 m2 Pembuatan bekisting untuk plat beton pracetak ( 5 kali pakai) 322,940
P-083 m2 Pembuatan bekisting untuk balok beton pracetak ( 10-12 kali pakai) 48,205
P-084 m2 Pembuatan bekisting untuk kolom beton pracetak (10-12 kali pakai) 46,580
P-085 bh Pemasangan dan membuka bekisting komponen plat beton pracetak 7,230
P-086 bh Pemasangan dan membuka bekisting komponen balok beton pracetak 11,490
P-087 bh Pemasangan dan membuka bekisting komponen Kolom beton pracetak 9,360
P-088 bh Penuangan/menebar beton untuk komponen plat pracetak 68,948
P-089 bh Penuangan/menebar beton untuk komponen balok pracetak 71,225
P-090 bh Penuangan/menebar beton untuk komponen kolom pracetak 64,482
P-091 bh Ereksi komponen untuk pelat pracetak 564,459
P-092 bh Ereksi komponen untuk balok pracetak 545,704
P-093 bh Ereksi komponen untuk Kolom pracetak 967,253
P-094 bh Melangsir komponen plat pracetak ( ± 20 m) 49,730
P-095 bh Melangsir komponen balok pracetak ( ± 20 m) 49,730
P-096 bh Melangsir komponen kolom pracetak ( ± 20 m) 49,730
P-097 m3 Grouting campuran 3,562,500
P-098 m3 Grouting tidak campuran 2,980,000
P-099 titik Upah melakukan grouting pada join pracetak 54,645
P-100 titik Pemasangan Bekisting join pracetak 88,970
P-101 titik Upah Join dengan Sling 64,735
P-102 titik Pemasangan besi profil 34,106
P-103 kg Pemasangan rangka kuda-kuda baja IWF 25,136
P-104 kg Pengerjaan pekerjaan perakitan 897
P-105 m2 Pembuatan pintu besi plat baja tebal 2 mm rangkap, rangka baja siku 825,121
P-106 m1 Pengerjaan pengelasan dengan las listrik 907,400
P-107 m2 Pembuatan rangka jendela besi scuare tube (25 x 5) cm 594,668
P-108 m2 Pemasangan pintu rolling door besi 863,328
P-109 m2 Pemasangan pintu lipat (folding door) plastik/PVC 592,070
P-110 m2 Pemasangan sunscreen alluminium 349,540
P-111 m2 Pemasangan rolling door alluminium 729,250
P-112 m1 Pemasangan kusen pintu alluminium 35,989
P-113 m2 Pemasangan pintu alluminium strip lebar 8 cm 445,217
P-114 m2 Pemasangan pintu kaca rangka alluminium 2,349,360
P-115 m2 Pemasangan venetions blinds dan Vertical blinds 169,394
P-116 m2 Pemasangan terali besi strip (2 x 3) mm 648,930
P-117 m2 Pemasangan kawat nyamuk 105,570
P-118 m2 Pemasangan jendela nako & tralis 195,685
P-119 m1 Pemasangan talang datar/ jurai seng bjls 28 lebar 90 cm 149,060
P-120 m1 Pemasangan talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm 97,230
P-121 m2 Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi 158,780
P-122 m2 Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon 191,330

Software RAB Exarch xPro 192/396


P-123 m2 (K3) Pemasangan atap pelana rangka atap baja canai dingin profil C75 258,104
P-124 m2 (K3) Pemasangan atap jurai rangka atap baja canai dingin profil C75 252,585
P-125 m2 Pemasangan PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP G 250,450
P-126 m2 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 2 PP 247,500
P-127 m2 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3 PP 236,590
P-128 m2 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 4 PP 228,780
P-129 m2 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 5 PP 225,420
P-130 m2 Pemasangan Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1 SP : 6 PP 225,710
P-131 m2 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 1 216,963
P-132 m2 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP 119,600
P-133 m2 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP 114,156
P-134 m2 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP 111,190
P-135 m2 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 5 PP 109,334
P-136 m2 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 6 PP 108,586
P-137 m2 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 8 PP 106,475
P-138 m2 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10 109,178
P-139 m2 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1KP :1 96,498
P-140 m2 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP : 97,574
P-141 m2 Pemasangan dinding conblock HB20 campuran 1SP : 3PP 415,966
P-142 m2 Pemasangan dinding conblock HB20 campuran 1SP:4PP 419,308
P-143 m2 Pemasangan dinding conblock HB15 campuran 1SP :3PP 304,352
P-144 m2 Pemasangan dinding conblock HB15 campuran 1SP :4PP 306,610
P-145 m2 Pemasangan dinding conblock HB10 campuran 1SP :3PP 236,633
P-146 m2 Pemasangan dinding conblock HB10 campuran 1SP :4PP 238,814
P-147 m2 Pemasangan dinding terawang (rooster) 12x11x24 campuran 1SP :3PP 85,500
P-148 m2 Pemasangan dinding terawang (rooster) 12x11x24 campuran 1SP :4PP 108,000
P-149 m2 Pemasangan dinding bata berongga ekspose 12x11x24 campuran 1 SP : 3 PP 124,385
P-150 m2 Pemasangan dinding bata ringan tebal 7,5 cm dengan mortar siap pakai B. 307,858
P-151 m2 Pemasangan dinding bata ringan tebal 10 cm dengan mortar siap pakai 399,636
P-152 m2 Pemasangan plesteran 1SP : 1PP tebal 15 mm. 69,760
P-153 m2 Pemasangan plesteran 1SP : 2PP tebal 15 mm. 63,916
P-154 m2 Pemasangan plesteran 1SP : 3PP tebal 15mm. 61,499
P-155 m2 Pemasangan plesteran 1SP : 4PP tebal 15 mm 59,757
P-156 m2 Pemasangan plesteran 1SP : 5PP tebal 15 mm 58,894
P-157 m2 Pemasangan plesteran 1SP : 6PP tebal 15 mm. 58,151
P-158 m2 Pemasangan plesteran 1SP : 7PP tebal 15 mm 57,782
P-159 m2 Pemasangan plesteran 1SP : 8PP tebal 15 mm 57,413
P-160 m2 Pemasangan plesteran 1SP : 1/2KP : 3PP tebal 15 mm 60,003
P-161 m2 Pemasangan plesteran 1SP : 2KP : 8PP tebal 15 mm 59,180
P-162 m2 Pemasangan plesteran 1SM : 1KP : 1PP tebal 15 mm 54,447
P-163 m2 Pemasangan plesteran 1SM : 1KP : 2PP tebal 15 mm 54,994
P-164 m2 Pemasangan plesteran 1SP : 1PP tebal 20 mm 85,677
P-165 m2 Pemasangan plesteran 1SP : 3PP tebal 20 mm 68,888
P-166 m2 Pemasangan plesteran 1SP : 4PP tebal 20 mm. 80,046
P-167 m2 Pemasangan plesteran 1SP : 5PP tebal 20 mm 78,981
P-168 m2 Pemasangan plesteran 1SP : 6PP tebal 20 mm 77,904
P-169 m2 Pemasangan plesteran 1SM : 1KP : 2PP tebal 20 mm 75,782
P-170 m2 Pemasangan berapen 1SP : 5PP tebal 15 mm 36,299
P-171 m1 Pemasangan plesteran skoning 1SP : 3PP lebar 10 cm 57,505
P-172 m2 Pemasangan plesteran granit 1SP : 2 granit tebal 1cm 306,455
P-173 m2 Pemasangan plesteran traso 1SP : 2 traso tebal 1cm 117,455
P-174 m2 Pemasangan plesteran ciprat 1SP : 2PP 46,921
P-175 m2 Pemasangan finishing siar pasangan bata merah 26,970
P-176 m2 Pemasangan Finishing siar pasangan conblock ekspose 12,870
P-177 m2 Pemasangan finishing siar pasangan batu kali, campuran 1SP : 2PP. 56,827

Software RAB Exarch xPro 193/396


P-178 m2 Pemasangan acian. 34,575
P-179 m2 Pemasangan plesteran dengan mortar siap pakai (MSP) 66,325
P-180 m2 Pemasangan Acian dengan mortar siap pakai (MSP) 35,030
P-181 m2 Pemasangan lantai ubin PC abu-abu ukuran 40cm x40cm 102,100
P-182 m2 Pemasangan lantai ubin PC abu-abu ukuran 30cm x30 cm 115,995
P-183 m2 Pemasangan lantai ubin PC abu-abu ukuran 20cm x20 cm 145,635
P-184 m2 Pemasangan lantai ubin warna ukuran 40cm x40 cm 177,955
P-185 m2 Pemasangan lantai ubin warna ukuran 30cm x30cm 234,805
P-186 m2 Pemasangan lantai ubin warna ukuran 20cm x20cm 395,185
P-187 m2 Pemasangan lantai ubin teraso ukuran 40cm x40cm 184,585
P-188 m2 Pemasangan lantai ubin teraso ukuran 30cm x30cm 246,675
P-189 m2 Pemasangan lantai ubin granit ukuran 40cm x40cm 214,420
P-190 m2 Pemasangan lantai ubin granit ukuran 30cm x30cm 276,350
P-191 m2 Pemasangan lantai ubin teralux marmer ukuran 40cm x40cm 161,380
P-192 m2 Pemasangan lantai ubin teralux ukuran 30cm x30cm 252,610
P-193 m2 Pemasangan lantai ubin teralux marmer ukuran 60cm x60cm 222,375
P-194 m2 Pemasangan lantai ubin teralux marmer ukuran 40cm x40cm 320,500
P-195 m2 Pemasangan lantai ubin teralux marmer ukuran 30cm x30cm 490,010
P-196 m1 Pemasangan plint ubin Pc abu-abu ukuran 15cm x 20cm 56,540
P-197 m1 Pemasangan plint ubin Pc abu-abu ukuran 10cm x 30cm 38,952
P-198 m1 Pemasangan plint ubin Pc abu-abu ukuran 10cm x 40cm 37,202
P-199 m1 Pemasangan plint ubin warna ukuran 10cm x 20cm 34,597
P-200 m1 Pemasangan plint ubin warna ukuran 10cm x 30cm 40,322
P-201 m1 Pemasangan plint ubin warna ukuran 10cm x 40cm 39,897
P-202 m1 Pemasangan plint ubin teraso ukuran 10cm x 30cm 40,322
P-203 m1 Pemasangan plint ubin teraso ukuran 10cm x 40cm 41,222
P-204 m1 Pemasangan plint ubin granit ukuran 10cm x 40cm 59,772
P-205 m1 Pemasangan plint ubin granit ukuran 10cm x 30cm 68,562
P-206 m1 Pemasangan plint ubin teralux kerang ukuran 10cm x 40cm 41,082
P-207 m1 Pemasangan plint ubin teralux kerang ukuran 10cm x 30cm 45,264
P-208 m1 Pemasangan plint ubin teralux marmer ukuran 10cm x 60cm 51,572
P-209 m1 Pemasangan plint ubin teralux marmer ukuran 10cm x 40cm 62,422
P-210 m1 Pemasangan plint ubin teralux marmer ukuran 10cm x 30cm 72,092
P-211 m2 Pemasangan lantai teraso cor di tempat, tebal 3cm 56,292
P-212 m2 Pemasangan lantai keramik artistik 10cm x 20cm 248,347
P-213 m2 Pemasangan lantai keramik artistik 10cm x 10cm atau 5cm x 20cm 441,347
P-214 m2 Pemasangan lantai keramik ukuran 33cm x 33cm 227,647
P-215 m2 Pemasangan lantai keramik ukuran 30cm x 30cm 224,420
P-216 m2 Pemasangan lantai keramik ukuran 20cm x 20cm 274,770
P-217 m2 keramik ukuran 10cm x 33cm untuk variasi/border 744,270
P-218 m2 Pemasangan lantai keramik mozaik ukuran 30cm x 30cm 307,005
P-219 m1 Pemasangan plint keramik ukuran 10cm x 20cm 59,897
P-220 m1 Pemasangan plint keramik ukuran 10cm x 10cm 85,182
P-221 m1 Pemasangan plint keramik ukuran 5cm x 20cm 47,994
P-222 m1 Pemasangan plint internal cove artistik 5cm x 5cm x 20cm 184,627
P-223 m2 Pemasangan lantai marmer ukuran 100cm x 100cm 199,577
P-224 m2 Pemasangan lantai karpet 638,715
P-225 m2 Pemasangan underlayer (pelapis bawah karpet) 59,585
P-226 m2 Pemasangan lantai parquet kayu 128,725
P-227 m2 Pemasangan lantai kayu gymfloor 418,525
P-228 m2 Pemasangan dinding porslen 11cm x 11cm 749,930
P-229 m2 Pemasangan dinding porslen 10cm x 20cm 459,505
P-230 m2 Pemasangan dinding porslen 20cm x 20cm 364,355
P-231 m2 Pemasangan dinding keramik artistik 10cm x 20cm 267,105
P-232 m2 Pemasangan dinding keramik artistik 5cm x 20cm 266,055

Software RAB Exarch xPro 194/396


P-233 m2 Pemasangan dinding keramik 10cm x 20cm 283,755
P-234 m2 Pemasangan dinding keramik 20cm x 20cm 251,105
P-235 m2 Pemasangan dinding marmer 100cm x 100cm 486,160
P-236 m2 Pemasangan dinding bata pelapis 3cm x 7cm x 24cm 262,797
P-237 m2 Pemasangan dinding batu paras 143,625
P-238 m2 Pemasangan dinding batu tempel hitam 333,925
P-239 m2 Pemasangan lantai vynil ukuran 30cm x 30cm 257,999
P-240 m2 Pemasangan wallpaper lebar 50 cm 130,920
P-241 m2 Pemasangan floor harderner 43,860
P-242 m1 Pemasangan plint vynil 15cm x 30cm 61,780
P-243 m1 Pemasangan plint kayu tebal 2 cm lebar 10 cm 43,823
P-244 m2 Pemasangan paving block natural tebal 6 cm 220,313
P-245 m2 Pemasangan paving block natural tebal 8 cm 92,498
P-246 m2 Pemasangan paving block berwarna tebal 6 cm 215,263
P-247 m2 Pemasangan paving block berwarna tebal 8 cm 200,063
P-248 m2 Pemasangan Aluminium Composite Panel 143,525
P-249 m2 Pemasangan langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm 99,520
P-250 m2 Pemasangan langit-langit akustik ukuran (30 x 30) cm 446,010
P-251 m2 Pemasangan langit-langit akustik ukuran (30 x 60) cm 345,010
P-252 m2 Pemasangan langit-langit akustik ukuran (60 x 120) cm 213,825
P-253 m2 Pemasangan langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 53,340
P-254 m2 Pemasangan langit-langit lambrisering kayu, tebal 9 mm 220,080
P-255 m2 Pemasangan langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm 46,926
P-256 m2 Pemasangan langit-langit akustik ukuran (60 x 120) cm berikut rangka allumin 361,470
P-257 m1 Pemasangan list langit-langit kayu profil 13,819
P-258 m2 Pemasangan Plafond PVC 178,825
P-259 m2 Pemasangan List Plafond PVC 53,875
P-260 m2 Pemasangan atap genteng palentong kecil 85,355
P-261 m2 Pemasangan atap genteng kodok glazuur 60,430
P-262 m2 Pemasangan atap genteng palentong besar/super 40,930
P-263 m1 Pemasangan bubung genteng palentong 100,930
P-264 m1 Pemasangan bubung genteng kodok glazuur 100,930
P-265 m1 Pemasangan bubung genteng palentong besar 95,930
P-266 m2 Pemasangan roof light fibreglass 90x180 94,195
P-267 m2 Pemasangan atap asbes gelombang 0,92mx2,5m x 5mm 77,020
P-268 m2 Pemasangan atap asbes gelombang 0,92mx2,25m x 5mm 87,720
P-269 m2 Pemasangan atap asbes gelombang 0,92mx2,00m x 5mm 86,885
P-270 m2 Pemasangan atap asbes gelombang 0,92mx1.80m x 5mm 102,935
P-271 m2 Pemasangan atap asbes gelombang 1.05mx3.00m x 4mm 60,135
P-272 m2 Pemasangan atap asbes gelombang 1.05mx2.70m x 4mm 67,625
P-273 m2 Pemasangan atap asbes gelombang 1.05mx2.40m x 4mm 69,765
P-274 m2 Pemasangan atap asbes gelombang 1.05mx2.10m x 4mm 77,255
P-275 m2 Pemasangan atap asbes gelombang 1.05mx1.50m x 4mm 108,285
P-276 m2 Pemasangan atap asbes gelombang 1.08mx3.00m x 6mm 62,275
P-277 m2 Pemasangan atap asbes gelombang 1.08mx2.70m x 6mm 63,345
P-278 m2 Pemasangan atap asbes gelombang 1.08mx2.40m x 6mm 71,905
P-279 m2 Pemasangan atap asbes gelombang 1.08mx2.10m x 6mm 75,115
P-280 m2 Pemasangan atap asbes gelombang 1.08mx1.80m x 6mm 83,675
P-281 m1 Pemasangan bubung stel gelombang 0,92m 65,230
P-282 m1 Pemasangan bubung stel gelombang 1,05m 60,430
P-283 m1 Pemasangan bubung stel gelombang 1,08m 59,630
P-284 m1 Pemasangan Nok paten 0,92m 76,630
P-285 m1 Pemasangan Nok paten 1,05m 76,630
P-286 m1 Pemasangan Nok paten 1,08m 76,630
P-287 m1 Pemasangan nok stel rata 0,92m 76,340

Software RAB Exarch xPro 195/396


P-288 m1 Pemasangan nok stel rata 1,05m 72,480
P-289 m2 Pemasangan genteng beton 60,800
P-290 m2 Pemasangan genteng aspal 132,370
P-291 m2 Pemasangan genteng metal ukuran 80 x 100 atap pelana 78,885
P-292 m2 Pemasangan genteng metal ukuran 80 x 100 atap Jurai 103,385
P-293 m2 Pemasangan atap sirap kayu 124,340
P-294 m1 Pemasangan nok genteng beton 151,650
P-295 m1 Pemasangan Nok genteng aspal 103,985
P-296 m1 Pemasangan nok genteng metal 133,455
P-297 m1 Pemasangan Nok sirap 70,985
P-298 m2 Pemasangan atap seng gelombang 67,710
P-299 m1 Pemasangan nok atap seng 43,910
P-300 m2 Pemasangan atap alumunium 253,330
P-301 m1 Pemasangan Nok alumunium 140,188
P-302 m2 Pemasangan alumunium foil/sisalation 51,375
P-303 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas I 11,369,000
P-304 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas II atau III 11,679,750
P-305 m2 Pembuatan dan pemasangan pintu klamp standar, kayu kelas II 295,080
P-306 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu kelas III 295,080
P-307 m2 Pembuatan dan pemasangan daun pintu panel, kayu kelas I atau II 585,750
P-308 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kelas I atau II 439,300
P-309 m2 Pembuatan dan pemasangan pintu dan jendela jalusi kayu kelas I atau II 669,750
P-310 m2 Pembuatan daun pintu plywood rangkap, rangka kayu kelas II tertutup 492,225
P-311 m2 Pembuatan pintu plywood rangkap, rangka expose kayu kelas I atau II 538,250
P-312 m2 Pemasangan jalusi kusen, kayu kelas I atau II 562,675
P-313 m2 Pemasangan teakwood rangkap, rangka expose kayu kelas I 501,550
P-314 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu kelas II 575,105
P-315 m3 Pemasangan konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 10,334,500
P-316 m3 Pemasangan konstruksi kuda-kuda expose, kayu kelas I 12,270,475
P-317 m3 Pemasangan konstruksi gordeng, kayu kelas II 11,455,475
P-318 m2 Pemasangan rangka atap genteng keramik, kayu kelas II 174,575
P-319 m2 Pemasangan rangka atap genteng beton, kayu kelas II 241,775
P-320 m2 Pemasangan rangka atap sirap, kayu kelas II 58,735
P-321 m2 Pemasangan rangka langit-langit (50 x 100) cm, kayu kelas II atau III 101,545
P-322 m2 Pemasangan rangka langit-langit (60 x 60) cm, kayu kelas II atau III 97,090
P-323 m1 Pemasangan lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II 72,725
P-324 m1 Pemasangan lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II 72,175
P-325 m2 Pemasangan rangka dinding pemisah (60 x 120) cm kayu kelas II atau III 279,730
P-326 m2 Pemasangan dinding pemisah teakwood rangkap, rangka kayu kelas II 263,210
P-327 m2 Pemasangan dinding pemisah plywood rangkap, rangka kayu kelas II 302,280
P-328 m2 Pemasangan dinding lambrisering dari Kayu Papan kelas I 290,663
P-329 m2 Pemasangan dinding lambrisering dari plywood ukuran (120 x 240) cm 48,260
P-330 m2 Pemasangan dinding bilik, rangka kayu kelas III atau IV 176,675
P-331 bh Pemasangan kunci tanam antik 324,655
P-332 bh Pemasangan kunci tanam biasa 189,275
P-333 bh Pemasangan kunci kamar mandi 108,480
P-334 bh Pemasangan kunci silinder 133,480
P-335 bh Pemasangan engsel pintu 35,673
P-336 bh Pemasangan engsel jendela kupu-kupu 32,443
P-337 bh Pemasangan engsel angin 39,593
P-338 bh Pemasangan spring knip 27,505
P-339 bh Pemasangan kait angin 25,505
P-340 bh Pemasangan door closer 312,305
P-341 bh Pemasangan kunci slot 74,885
P-342 bh Pemasangan Door holder 159,305

Software RAB Exarch xPro 196/396


P-343 bh Pemasangan door stop 111,275
P-344 bh Pemasangan Rrel pintu sorong 274,655
P-345 bh Pemasangan kunci lemari 43,116
P-346 m2 Pemasangan kaca tebal 3 mm 128,573
P-347 m2 Pemasangan kaca tebal 5 mm 161,573
P-348 m2 Pemasangan kaca tebal 8 mm 238,272
P-349 m2 Pemasangan kaca buram tebal 12 mm 211,376
P-350 m2 Pemasangan kaca cermin tebal 5 mm 185,555
P-351 m2 Pemasangan kaca cermin tebal 8 mm 281,160
P-352 m2 Pemasangan kaca wireglassed tebal 5 mm 278,505
P-353 m2 Pemasangan kaca patri tebal 5 mm 128,765
P-354 m2 Pengikisan/pengerokan permukaan cat lama 15,555
P-355 m2 Pencucian bidang permukaan tembok yang pernah dicat 13,865
P-356 m2 Pengerokan karat pada permukaan baja cara manual 14,790
P-357 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 41,935
P-358 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat Penutup 56,635
P-359 m2 Pelaburan bidang kayu dengan teak oil 25,645
P-360 m2 Pelaburan bidang kayu dengan politur 37,625
P-361 m2 Pelaburan bidang kayu dengan cat residu dan ter 12,585
P-362 m2 Pelaburan bidang kayu dengan vernis 52,095
P-363 m2 Pengecatan tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 26,300
P-364 m2 Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) 21,865
P-365 m2 Pelaburan tembok dengan kalkarium 8,290
P-366 m2 Pelaburan tembok dengan kapur sirih 15,795
P-367 m2 Pelaburan tembok lama dengan kapur sirih (pemeliharaan) 9,235
P-368 m2 Pemasangan wallpaper 69,763
P-369 m2 Pengecatan permukaan baja dengan menie besi 28,033
P-370 m2 Pengecatan permukaan baja dengan menie besi dengan perancah 54,433
P-371 m2 Pengecatan permukaan baja galvanis secara manual 4 lapis 61,601
P-372 m2 Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir 28,375
P-373 m2 Pengecatan permukaan baja galvanis secara manual sistem 3 lapis 145,120
P-374 m2 Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir 132,950
P-375 m2 Plituran dengan plitur melamic 13,805
P-376 bh (K3) Pemasangan closet duduk/moblock 2,936,600
P-377 bh Pemasangan closet jongkok porslen 547,450
P-378 bh Pemasangan closet jongkok teraso 531,650
P-379 bh (K3) Pemasangan uriir 1,694,600
P-380 bh (K3) Pemasangan wastafel 1,580,950
P-381 bh (K3) Pemasangan bathcuip porselen 2,893,180
P-382 bh (K3) Pemasangan bak fibreglass vol 1 m3 1,229,000
P-383 bh (K3) Pemasangan bak mandi batu bata vol 0,30 m3 3,620,550
P-384 bh Pemasangan bak mandi teraso vol 0,30 m3 1,229,000
P-385 bh Pemasangan bak air fibreglass vol 1 m3 430,025
P-386 bh Pemasangan bak beton volume 1 m3 8,113,330
P-387 bh Pemasangan bak cuci piring stainlessteel 545,825
P-388 bh Pemasangan bak cuci piring teraso 611,125
P-389 bh Pemasangan floor drain 73,275
P-390 bh Pemasangan bak kontrol pasangan bata 30x30 tinggi 35 cm 415,885
P-391 bh Pemasangan bak kontrol pasangan bata 45cm x45cm tinggi 50 cm 623,260
P-392 bh Pemasangan bak kontrol pasangan bata 60cm x60cm tinggi 65 cm 752,440
P-393 m1 Pemasangan pipa galvanis diameter ½” 52,135
P-394 bh Pemasangan kran diameter ½” atau 3/4” 72,888
P-395 m1 Pemasangan pipa galvanis diameter 3/4” 58,135
P-396 m1 Pemasangan pipa galvanis diameter 1” 74,935
P-397 m1 Pemasangan pipa galvanis diameter 1 ½” 129,005

Software RAB Exarch xPro 197/396


P-398 m1 Pemasangan pipa galvanis diameter 3” 165,720
P-399 m1 Pemasangan pipa galvanis diameter 4” 206,520
P-400 m1 Pemasangan pipa PVC tipe AW diameter 1/2” 22,130
P-401 m1 Pemasangan pipa PVC tipe AW diameter 3/4” 23,930
P-402 m1 Pemasangan pipa PVC tipe AW diameter 1” 24,530
P-403 m1 Pemasangan pipa PVC tipe AW diameter 11/2” 30,295
P-404 m1 Pemasangan pipa PVC tipe AW diameter 2” 30,895
P-405 m1 Pemasangan pipa PVC tipe AW diameter 21/2” 39,150
P-406 m1 Pemasangan pipa PVC tipe AW diameter 3” 39,750
P-407 m1 Pemasangan pipa PVC tipe AW diameter 4” 40,950
P-408 m1 Pemasangan pipa air limbah jenis pipa tanah 138,410
P-409 m1 Pemasangan pipa air limbah jenis pipa tanah diameter 15 cm 89,904
P-410 m1 Pemasangan pipa beton diameter 15 - 20 cm 105,939
P-411 m1 Pemasangan pipa beton diameter 30 - 100 cm 161,268
P-412 m1 (K3) Pemasangan pipa PVC Ø 63 mm 98,300
P-413 m1 (K3) Pemasangan pipa PVC Ø 90 mm 120,135
P-414 m1 (K3) Pemasangan pipa PVC Ø 110 mm 152,985
P-415 m1 (K3) Pemasangan pipa PVC Ø 150 mm 188,820
P-416 m1 (K3) Pemasngan pipa PVC Ø 200 mm 365,420
P-417 m1 (K3) Pemasangan pipa PVC Ø 250 mm 527,435
P-418 m1 (K3) Pemasangan pipa PVC Ø 300 mm 798,955
P-419 m1 (K3) Pemasangan pipa PVC Ø 400 mm 1,473,230
P-420 m1 (K3) Pemasangan pipa PVC Ø 450 mm 1,750,010
P-421 m1 (K3) Pemasangan pipa PVC Ø 500 mm 2,481,895
P-422 m1 (K3) Pemasangan pipa PVC Ø 600 mm 3,815,518
P-423 m1 (K3) Pemasangan pipa PVC Ø 800 mm 5,266,525
P-424 m1 (K3) Pemasangan pipa PVC Ø 900 mm 6,583,395
P-425 m1 (K3) Pemasangan pipa PVC Ø 1000 mm 7,929,940
P-426 m1 (K3) Pemasangan pipa PVC Ø 1100 mm 9,276,773
P-427 m1 (K3) Pemasangan pipa PVC Ø 1200 mm 10,623,133
P-428 m1 (K3) Pemasangan pipa HDPE Ø 63 mm 69,208
P-429 m1 (K3) Pemasangan pipa HDPE Ø 100 mm 139,118
P-430 m1 (K3) Pemasangan pipa HDPE Ø 125 mm 254,028
P-431 m1 (K3) Pemasangan pipa HDPE Ø 150 mm 314,458
P-432 m1 (K3) Pemasangan pipa HDPE Ø 200 mm 631,598
P-433 m1 (K3) Pemasangan pipa HDPE Ø 250 mm 986,255
P-434 m1 (K3) Pemasangan pipa HDPE Ø 300 mm 1,576,808
P-435 m1 (K3) Pemasangan pipa HDPE Ø 400 mm 2,534,335
P-436 m1 (K3) Pemasangan pipa HDPE Ø 450 mm 3,212,675
P-437 m1 (K3) Pemasangan pipa HDPE Ø 500 mm 3,884,958
P-438 m1 (K3) Pemasangan pipa HDPE Ø 600 mm 3,923,613
P-439 m1 (K3) Pemasangan pipa HDPE Ø 800 mm 9,107,713
P-440 m1 (K3) Pemasangan pipa HDPE Ø 900 mm 10,424,898
P-441 m1 (K3) Pemasangan pipa HDPE Ø 1000 mm 12,271,168
P-442 m1 (K3) Pemasangan pipa HDPE Ø 1100 mm 12,348,463
P-443 m1 (K3) Pemasangan pipa HDPE Ø 1200 mm 13,612,235
P-444 m1 (K3) Pemasangan pipa GIP Ø 63 mm 220,770
P-445 m1 (K3) Pemasangan pipa GIP Ø 100 mm 298,355
P-446 m1 (K3) Pemasangan pipa GIP Ø 125 mm 362,385
P-447 m1 (K3) Pemasangan pipa GIP Ø 150 mm 428,340
P-448 m1 (K3) Pemasangan pipa GIP Ø 200 mm 583,105
P-449 m1 (K3) Pemasangan pipa GIP Ø 250 mm 716,835
P-450 m1 (K3) Pemasangan pipa GIP Ø 300 mm 828,435
P-451 m1 (K3) Pemasangan pipa GIP Ø 400 mm 1,095,174
P-452 m1 (K3) Pemasangan pipa GIP Ø 450 mm 1,226,999

Software RAB Exarch xPro 198/396


P-453 m1 (K3) Pemasangan pipa GIP Ø 500 mm 1,364,285
P-454 m1 (K3) Pemasangan pipa GIP Ø 600 mm 1,563,025
P-455 m1 (K3) Pemasangan pipa GIP Ø 800 mm 2,161,953
P-456 m1 (K3) Pemasangan pipa GIP Ø 900 mm 2,427,878
P-457 m1 (K3) Pemasangan pipa GIP Ø 1000 mm 2,692,623
P-458 m1 (K3) Pemasangan pipa GIP Ø 1100 mm 2,957,453
P-459 m1 (K3) Pemasangan pipa GIP Ø 1200 mm 2,955,366
P-460 m1 (K3) Pemasangan pipa DCI Ø 100 mm 376,980
P-461 m1 (K3) Pemasangan pipa DCI Ø 125 mm 447,120
P-462 m1 (K3) Pemasangan pipa DCI Ø 150 mm 564,240
P-463 m1 (K3) Pemasangan pipa DCI Ø 200 mm 835,050
P-464 m1 (K3) Pemasangan pipa DCI Ø 250 mm 915,035
P-465 m1 (K3) Pemasangan pipa DCI Ø 300 mm 1,203,698
P-466 m1 (K3) Pemasangan pipa DCI Ø 400 mm 2,657,205
P-467 m1 (K3) Pemasangan pipa DCI Ø 450 mm 3,111,071
P-468 m1 (K3) Pemasangan pipa DCI Ø 500 mm 3,558,025
P-469 m1 (K3) Pemasangan pipa DCI Ø 600 mm 4,023,131
P-470 m1 (K3) Pemasangan pipa DCI Ø800 mm 5,592,453
P-471 m1 (K3) Pemasangan pipa DCI Ø900 mm 6,072,142
P-472 m1 (K3) Pemasangan pipa DCI Ø1000 mm 7,188,950
P-473 m1 (K3) Pemasangan pipa DCI Ø1100 mm 7,867,965
P-474 m1 (K3) Pemasangan pipa DCI Ø1200 mm 8,892,529
P-475 m1 (K3) Pemasangan pipa baja Ø 63 mm 271,888
P-476 m1 (K3) Pemasangan pipa baja Ø 100 mm 448,435
P-477 m1 (K3) Pemasangan pipa baja Ø 125 mm 290,328
P-478 m1 (K3) Pemasangan pipa baja Ø 150 mm 213,405
P-479 m1 (K3) Pemasangan pipa baja Ø 200 mm 353,330
P-480 m1 (K3) Pemasangan pipa baja Ø 250 mm 427,620
P-481 m1 (K3) Pemasangan pipa baja Ø 300 mm 491,550
P-482 m1 (K3) Pemasangan pipa baja Ø 400 mm 777,177
P-483 m1 (K3) Pemasangan pipa baja Ø 450 mm 809,745
P-484 m1 (K3) Pemasangan pipa baja Ø 500 mm 896,476
P-485 m1 (K3) Pemasangan pipa baja Ø 600 mm 972,687
P-486 m1 (K3) Pemasangan pipa baja Ø 800 mm 1,446,812
P-487 m1 (K3) Pemasangan pipa baja Ø 900 mm 1,552,637
P-488 m1 (K3) Pemasangan pipa baja Ø 1000 mm 1,967,159
P-489 m1 (K3) Pemasangan pipa baja Ø 1100 mm 2,096,393
P-490 m1 (K3) Pemasangan pipa baja Ø 1200 mm 2,227,073
P-491 m1 (K3) Pemotongan pipa PVC Ø 63 mm 84,438
P-492 m1 (K3) Pemotongan pipa PVC Ø 90 mm 104,795
P-493 bh (K3) Pemotongan pipa PVC Ø 110 mm 136,060
P-494 bh (K3) Pemotongan pipa PVC Ø 150 mm 170,410
P-495 bh (K3) Pemotongan pipa PVC Ø 200 mm 341,445
P-496 bh (K3) Pemotongan pipa PVC Ø 250 mm 498,885
P-497 bh (K3) Pemotongan pipa PVC Ø 300 mm 767,530
P-498 bh (K3) Pemotongan pipa PVC Ø 400 mm 1,423,480
P-499 bh (K3) Pemotongan pipa PVC Ø 450 mm 1,699,570
P-500 bh (K3) Pemotongan pipa PVC Ø 500 mm 2,424,400
P-501 bh (K3) Pemotongan pipa PVC Ø 600 mm 3,751,425
P-502 bh (K3) Pemotongan pipa PVC Ø 800 mm 5,171,230
P-503 bh (K3) Pemotongan pipa PVC Ø 900 mm 6,484,375
P-504 bh (K3) Pemotongan pipa PVC Ø 1000 mm 7,821,540
P-505 bh (K3) Pemotongan pipa PVC Ø 1100 mm 9,157,870
P-506 bh (K3) Pemotongan pipa PVC Ø 1200 mm 10,494,850
P-507 bh (K3) Pemotongan pipa HDPE Ø 63 mm 62,381

Software RAB Exarch xPro 199/396


P-508 bh (K3) Pemotongan pipa HDPE Ø 100 mm 137,587
P-509 bh (K3) Pemotongan pipa HDPE Ø 125 mm 255,981
P-510 bh (K3) Pemotongan pipa HDPE Ø 150 mm 320,301
P-511 bh (K3) Pemotongan pipa HDPE Ø 200 mm 647,230
P-512 bh (K3) Pemotongan pipaHDPE Ø 250 mm 1,000,319
P-513 bh (K3) Pemotongan pipa HDPE Ø 300 mm 1,588,973
P-514 bh (K3) Pemotongan pipa HDPE Ø 400 mm 2,529,740
P-515 bh (K3) Pemotongan pipa HDPE Ø 450 mm 3,198,574
P-516 bh (K3) Pemotongan pipa HDPE Ø 500 mm 3,859,848
P-517 bh (K3) Pemotongan pipa HDPE Ø 600 mm 6,191,891
P-518 bh (K3) Pemotongan pipa HDPE Ø 800 mm 9,010,081
P-519 bh (K3) Pemotongan pipa HDPE Ø 900 mm 10,230,144
P-520 bh (K3) Pemotongan pipa HDPE Ø 1000 mm 11,016,107
P-521 bh (K3) Pemotongan pipa HDPE Ø 1100 mm 11,068,240
P-522 bh (K3) Pemotongan pipa HDPE Ø 1200 mm 13,212,612
P-523 bh (K3) Pemotongan pipa GIP Ø 63 mm 164,035
P-524 bh (K3) Pemotongan pipa GIP Ø 100 mm 238,990
P-525 bh (K3) Pemotongan pipa GIP Ø 125 mm 311,810
P-526 bh (K3) Pemotongan pipa GIP Ø 150 mm 372,990
P-527 bh (K3) Pemotongan pipa GIP Ø 200 mm 526,340
P-528 bh (K3) Pemotongan pipa GIP Ø 250 mm 657,170
P-529 bh (K3) Pemotongan pipa GIP Ø 300 mm 771,940
P-530 bh (K3) Pemotongan pipa GIP Ø 400 mm 1,039,520
P-531 bh (K3) Pemotongan pipa GIP Ø 450 mm 1,166,655
P-532 bh (K3) Pemotongan pipa GIP Ø 500 mm 1,291,175
P-533 bh (K3) Pemotongan pipa GIP Ø 600 mm 1,510,800
P-534 bh (K3) Pemotongan pipa GIP Ø 800 mm 2,059,790
P-535 bh (K3) Pemotongan pipa GIP Ø 900 mm 2,311,445
P-536 bh (K3) Pemotongan pipa GIP Ø 1000 mm 2,574,235
P-537 bh (K3) Pemotongan pipa GIP Ø 1100 mm 2,826,160
P-538 bh (K3) Pemotongan pipa GIP Ø 1200 mm 3,077,900
P-539 bh (K3) Pemotongan pipa DCI Ø 100 mm 147,148
P-540 bh (K3) Pemotongan pipa DCI Ø 125 mm 218,480
P-541 bh (K3) Pemotongan pipa DCI Ø 150 mm 337,180
P-542 bh (K3) Pemotongan pipa DCI Ø 200 mm 620,770
P-543 bh (K3) Pemotongan pipa DCI Ø 250 mm 867,333
P-544 bh (K3) Pemotongan pipa DCI Ø 300 mm 1,150,483
P-545 bh (K3) Pemotongan pipa DCI Ø 400 mm 2,618,875
P-546 bh (K3) Pemotongan pipa DCI Ø 450 mm 3,054,835
P-547 bh (K3) Pemotongan pipa DCI Ø 500 mm 3,486,755
P-548 bh (K3) Pemotongan pipa DCI Ø 600 mm 3,886,500
P-549 bh (K3) Pemotongan pipa DCI Ø 800 mm 5,322,430
P-550 bh (K3) Pemotongan pipa DCI Ø 900 mm 5,763,845
P-551 bh (K3) Pemotongan pipa DCI Ø 1000 mm 6,783,205
P-552 bh (K3) Pemotongan pipa DCI Ø 1100 mm 7,413,140
P-553 bh (K3) Pemotongan pipa DCI Ø 1200 mm 8,353,820
P-554 bh (K3) Pemotongan pipa baja Ø 63 mm 235,918
P-555 bh (K3) Pemotongan pipa baja Ø 100 mm 411,405
P-556 bh (K3) Pemotongan pipa baja Ø 125 mm 252,043
P-557 bh (K3) Pemotongan pipa baja Ø 150 mm 175,920
P-558 bh (K3) Pemotongan pipa baja Ø 200 mm 311,840
P-559 bh (K3) Pemotongan pipa baja Ø 250 mm 388,065
P-560 bh (K3) Pemotongan pipa baja Ø 300 mm 453,715
P-561 bh (K3) Pemotongan pipa baja Ø 400 mm 666,090
P-562 bh (K3) Pemotongan pipa baja Ø 450 mm 714,365

Software RAB Exarch xPro 200/396


P-563 bh (K3) Pemotongan pipa baja Ø 500 mm 787,040
P-564 bh (K3) Pemotongan pipa baja Ø 600 mm 885,935
P-565 bh (K3) Pemotongan pipa baja Ø 800 mm 1,271,910
P-566 bh (K3) Pemotongan pipa baja Ø 900 mm 1,430,830
P-567 bh (K3) Pemotongan pipa baja Ø 1000 mm 1,740,585
P-568 bh (K3) Pemotongan pipa baja Ø 1100 mm 1,844,590
P-569 bh (K3) Pemotongan pipa baja Ø 1200 mm 1,899,345
P-570 bh (K3) Pemasangan Valve Ø 150 mm 5,866,670
P-571 bh (K3) Pemasangan Valve Ø 200 mm 7,104,775
P-572 bh (K3) Pemasangan Valve Ø 250 mm 9,952,025
P-573 bh (K3) Pemasangan Valve Ø 300 mm 3,543,250
P-574 bh (K3) Pemasangan Valve Ø 400 mm 4,998,920
P-575 bh (K3) Pemasangan Valve Ø 450 mm 5,498,920
P-576 bh (K3) Pemasangan Valve Ø 500 mm 6,086,500
P-577 bh (K3) Pemasangan Valve Ø 600 mm 6,816,655
P-578 bh (K3) Pemasangan Valve Ø 700 mm 7,980,670
P-579 bh (K3) Pemasangan Valve Ø 800 mm 9,035,475
P-580 bh (K3) Pemasangan Valve Ø 900 mm 10,404,900
P-581 bh (K3) Pemasangan Valve Ø 1000 mm 12,917,180
P-582 bh (K3) Pemasangan Valve Ø 1100 mm 13,483,000
P-583 bh (K3) Pemasangan Valve Ø 1200 mm 14,983,000
P-584 bh (K3) Pemasangan Tee Ø 150 mm 179,575
P-585 bh (K3) Pemasangan Tee Ø 200 mm 246,933
P-586 bh (K3) Pemasangan 1 buah Tee Ø 250 mm 318,543
P-587 bh (K3) Pemasangan Tee Ø 300 mm 603,250
P-588 bh (K3) Pemasangan Tee Ø 400 mm 737,020
P-589 bh (K3) Pemasangan Tee Ø 450 mm 803,905
P-590 bh (K3) Pemasangan Tee Ø 500 mm 918,040
P-591 bh (K3) Pemasangan Tee Ø 600 mm 960,303
P-592 bh (K3) Pemasangan Tee Ø 700 mm 1,127,043
P-593 bh (K3) Pemasangan Tee Ø 800 mm 1,292,733
P-594 bh (K3) Pemasangan Tee Ø 900 mm 1,490,343
P-595 bh (K3) Pemasangan Tee Ø 1000 mm 1,718,475
P-596 bh (K3) Pemasangan Tee Ø 1100 mm 1,872,195
P-597 bh (K3) Pemasangan Tee Ø 1200 mm 2,019,805
P-598 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 80 mm 1,387,159
P-599 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 100 mm 1,554,154
P-600 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 150 mm 1,900,141
P-601 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 200 mm 2,323,129
P-602 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 250 mm 2,705,116
P-603 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 300 mm 3,093,104
P-604 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 400 mm 3,862,079
P-605 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 450 mm 4,286,066
P-606 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 500 mm 4,657,054
P-607 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 600 mm 5,453,029
P-608 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 700 mm 6,259,004
P-609 bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 800 mm 7,011,979
P-610 bh (K3) Pengetesan pipa Ø 50 mm 1,598
P-611 m1 (K3) Pengetesan pipa Ø 75 mm 1,698
P-612 m1 (K3) Pengetesan pipa Ø 100 mm 1,898
P-613 m1 (K3) Pengetesan pipa Ø 150 mm 2,398
P-614 m1 (K3) Pengetesan 1 m pipa Ø 200 mm 3,048
P-615 m1 (K3) Pengetesan pipa Ø 250 mm 3,948
P-616 m1 (K3) Pengetesan 1 m pipa Ø 300 mm 5,048
P-617 m1 (K3) Pengetesan pipa Ø 400 mm 7,798

Software RAB Exarch xPro 201/396


P-618 m1 (K3) Pengetesan 1 m pipa Ø 500 mm 9,398
P-619 m1 (K3) Pengetesan pipa Ø 600 mm 15,648
P-620 titik (K3) Pemasangan titik lampu 417,938
P-621 titik Memasang Instalasi Penerangan 235,525
S-001 m1 Pek. Pengukuran & Pemasangan Bowplank 87,925
S-002 m2 Pekerjaan Pengukuran Gedung 16,194
S-003 m2 Membersihkan Lapangan dan Perataan 17,750
S-004 m2 Pembuatan jalan sementara, tebal 25 cm 188,850
S-005 m2 Pembuatan Jalan Sementara 156,800
S-006 m2 Pek. Kantor Direksi Keet , dengan lantai plesteran 1,459,925
S-007 m1 Pagar Sementara dari Seng Gelombang tinggi 2 m 449,399
S-008 m1 Pagar Sementara dari Kawat Duri tinggi 1.8 m 1,459,499
S-009 m1 Pagar Sementara dari Kayu tinggi 2 m 355,299
S-010 m1 Pasang pagar kawat jaring galvanis, tinggi 1,00 m 23,930
S-011 m2 Pembuatan Gudang Semen dan Alat - alat 1,313,725
S-012 m2 Pembuatan Rumah Jaga / Konstruksi Kayu 1,497,750
S-013 m2 Pembuatan Bedeng Buruh 1,349,725
S-014 m2 Pembuatan Bak Adukan ( 40 x 50 x 20 ) cm 171,278
S-015 m2 Pembuatan Stegger dari Bambu, ( 40 x 50 x 20 ) cm 65,533
S-016 m1 Pasang pagar beton pracetak ( 5 x 50 x 213 ) cm 431,530
S-017 bh Membuat Papan Nama Proyek 80x120 cm (bahan seng) 920,425
S-018 bh Membuat Papan Nama Proyek 80x120 cm (bahan flexi) 615,500
S-019 m3 Membongkar pasangan batu kali 434,000
S-020 m3 Membongkar pasangan batu merah dan membersihkan 208,500
S-021 m3 Membongkar beton bertulang dan membersihkan 718,500
S-022 m2 Pekerjaan bongkar lantai tegel untuk dipergunakan lagi 18,850
S-023 m2 Mengupas plesteran lama 12,938
S-024 m2 Membongkar genteng / sirap untuk dipergunakan lagi 18,850
S-025 m2 Membongkar atap seng 13,500
S-026 m2 Membongkar usuk / reng dipakai lagi 25,750
S-027 m2 Membongkar usuk / reng tidak dipakai lagi 18,850
S-028 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk digunakan lagi 1,067,000
S-029 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan tidak digunakan lagi 122,000
S-030 m3 Mengerjakan kembali bangunan kayu yang telah dibongkar 1,757,000
S-031 m3 Menggali tanah biasa sedalam 1 meter 68,375
S-032 m3 Menggali tanah biasa sedalam 2 meter 84,825
S-033 m3 Menggali tanah biasa sedalam 3 meter 101,645
S-034 m3 Menggali tanah keras sedalam 1 meter 90,920
S-035 m3 Menggali tanah cadas sedalam 1 meter 138,600
S-036 m3 Menggali tanah lumpur sedalam 1 meter 110,325
S-037 m2 Mengerjakan stripping tebing setinggi 1 meter 5,175
S-038 m3 Urug kembali bekas galian 19,835
S-039 m3 Membuang tanah sejauh 30 meter 29,900
S-040 m3 Membuang tanah sejauh 150 meter 53,110
S-041 m3 Memadatkan tanah (per 20 cm) 51,750
S-042 m2 Meratakan tanah ditumbuk halus 23,100
S-043 m3 Mengurug pasir urug 267,350
S-044 m3 Memasang Lapisan pudel campuran 1 KP : 3 PP : 7 TL 370,080
S-045 m3 Memasang Lapisan pudel campuran 1 KP : 5 TL 316,858
S-046 m3 Memasang lapisan ijuk tebal 10 cm 330,525
S-047 m3 Pemasangan lapisan ijuk 267,525
S-048 m3 Mengurug sirtu padat untuk peninggian lantai bangunan 312,675
S-049 m3 Urug tanah mendatangkan 219,350
S-050 m3 Membuang tanah dengan menghampar 23,100
S-051 m1 Pekerjaan Membuat sumur 360,254

Software RAB Exarch xPro 202/396


S-052 m2 Pekerjaan Gebalan rumput 80,725
S-053 m3 Pasangan pondasi 1 Pc : 1 Ps 1,092,295
S-054 m3 Pasangan pondasi 1 Pc : 2 Ps 958,610
S-055 m3 Memasang pondasi batu belah, campuran 1 PC : 3 PP 913,900
S-056 m3 Memasang pondasi batu belah, campuran 1 PC : 4 PP 872,125
S-057 m3 Memasang pondasi batu belah, campuran 1 PC : 5 PP 843,145
S-058 m3 Memasang pondasi batu belah, campuran 1 PC : 6 PP 822,780
S-059 m3 Memasang pondasi batu belah, campuran 1 PC : 8 PP 794,845
S-060 m3 Pasangan pondasi 1 Kp : 1 Sm : 1 Ps 756,990
S-061 m3 Memasang pondasi batu belah, campuran 1 KP : 1 SM : 2 PP 700,175
S-062 m3 Pasangan pondasi 1 Pc : 3 Kp : 5 Ps 861,291
S-063 m3 Memasang pondasi batu belah, campuran 1 PC : 3 KP : 10 PP 804,415
S-064 m3 Memasang pondasi batu belah, campuran 1/4 PC : 1 KP : 4 PP 778,480
S-065 m3 Memasang batu kosong (aanstamping) 504,765
S-066 m3 Memasang pondasi siklop, 60% beton campuran 1 PC:2 PB:3 KR dan 40% batu bela 2,272,022
S-067 m3 Memasang pondasi siklop, 60% beton campuran 1 PC:2 PB:3 KR dan 40% batu belah 969,722
S-068 m3 Memasang pondasi sumuran, diameter 100 cm 862,037
S-069 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 247,500
S-070 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 236,590
S-071 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 228,780
S-072 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 225,420
S-073 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 225,710
S-074 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 209,505
S-075 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spes 119,600
S-076 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spes 114,156
S-077 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spes 111,190
S-078 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spes 109,334
S-079 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spes 108,586
S-080 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) tebal 1/2 bata, campuran spesi 1 106,475
S-081 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spes 105,110
S-082 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spe 91,616
S-083 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spes 93,777
S-084 m2 Memasang dinding HB 20, campuran spesi 1 PC : 3 PP 411,161
S-085 m2 Memasang dinding HB 20, campuran spesi 1 PC : 4 PP 414,503
S-086 m2 Memasang dinding HB 15, campuran spesi 1 PC : 3 PP 308,122
S-087 m2 Memasang dinding HB 15, campuran spesi 1 PC : 4 PP 310,380
S-088 m2 Memasang dinding HB 10, campuran spesi 1 PC : 3 PP 236,633
S-089 m2 Memasang dinding HB 10, campuran spesi 1 PC : 4 PP 238,814
S-090 m2 Memasang dinding terawang (roster) ukuran 25 x 25 cm, campuran spesi 1 PC : 3 PP 306,135
S-091 m2 Memasang dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC 321,135
S-092 m2 Memasang dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC 318,000
S-093 m2 Memasang dinding bata berongga ekspose ukuran (5 x 11 x 24) cm, campuran spesi 1 176,885
S-094 m2 Pasangan dinding batako 133,200
S-095 m1 Memasang rollag bata , campuran spesi 1 PC : 3 PP 32,901
S-096 m3 Membuat beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87 834,540
S-097 m3 Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78 866,993
S-098 m3 Membuat beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72 892,519
S-099 m3 Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87 769,267
S-100 m3 Membuat beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66 922,596
S-101 m3 Membuat beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61 951,521
S-102 m3 Membuat beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58 972,922
S-103 m3 Membuat beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56 987,448
S-104 m3 Membuat beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53 1,012,545
S-105 m3 Membuat beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52 1,020,294
S-106 m3 Membuat beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49 1,100,611

Software RAB Exarch xPro 203/396


S-107 m3 Membuat beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48 1,110,787
S-108 m3 Membuat beton kedap air dengan strorox – 100 1,102,375
S-109 kg Pembesian dengan besi ulir 12,327
S-110 kg Pembesian dengan besi polos 12,327
S-111 kg Memasang kabel presstressed polos/strands 11,791
S-112 kg Memasang jaring kawat baja/wire mesh 13,214
S-113 m2 Cetakan beton / begisting memakai papan 167,250
S-114 m2 Cetakan beton / begisting memakai multiplek 158,345
S-115 m3 Membongkar cetakan 4,234,075
S-116 m1 Pembuatan tiang pancang (40 x 40) cm, beton bertulang 953,878
S-117 m1 Pembuatan tiang pancang (35 x 35) cm, beton bertulang 756,018
S-118 m1 Memasang 1 m’ PVC Waterstop lebar 150 mm 91,005
S-119 m1 Memasang PVC Waterstop lebar 200 mm 93,245
S-120 m1 Membuat PVC Waterstop lebar 230 mm – 320 mm 94,040
S-121 m1 Cor beton kerb ( 15 x 30 ) cm 57,779
S-122 m1 Cor beton Devider ( 30 x 30 ) cm 104,337
S-123 m2 Memasang plesteran 1 PC : 1 PP, tebal 15 mm 69,760
S-124 m2 Memasang plesteran 1 PC : 2 PP, tebal 15 mm 63,916
S-125 m2 Memasang plesteran 1 PC : 3 PP, tebal 15 mm 61,499
S-126 m2 Memasang plesteran 1 PC : 4 PP, tebal 15 mm 59,757
S-127 m2 Memasang plesteran 1 PC : 5 PP, tebal 15 mm 58,894
S-128 m2 Memasang plesteran 1 PC : 6 PP, tebal 15 mm 58,151
S-129 m2 Memasang plesteran 1 PC : 7 PP, tebal 15 mm 57,782
S-130 m2 Memasang plesteran 1 PC : 8 PP, tebal 15 mm 57,413
S-131 m2 Memasang plesteran 1 PC : 1/2 KP : 3 PP, tebal 15 mm 58,780
S-132 m2 Memasang plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm 57,142
S-133 m2 Memasang plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm 50,901
S-134 m2 Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm 52,236
S-135 m2 Plesteran 1 Pc : 3 Kp : 10 Ps, tebal 15 mm 56,632
S-136 m2 Memasang plesteran 1 PC : 2 PP, tebal 20 mm 85,677
S-137 m2 Memasang plesteran 1 PC : 3 PP, tebal 20 mm 68,888
S-138 m2 Memasang plesteran 1 PC : 4 PP, tebal 20 mm 80,046
S-139 m2 Memasang plesteran 1 PC : 5 PP, tebal 20 mm 78,981
S-140 m2 Memasang plesteran 1 PC : 6 PP, tebal 20 mm 77,904
S-141 m2 Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm 72,236
S-142 m2 Memasang Berapen 1 PC : 5 PP, tebal 15 mm 36,299
S-143 m1 Plesteran skoneng 1 Pc : 2 Ps ( untuk gedung ) 15,875
S-144 m1 Sponengan (untuk saluran dan sejenisnya) 12,620
S-145 m2 Memasang Plesteran Granit , 1 PC : 2 Granit, tebal 10 mm 306,455
S-146 m2 Memasang Plesteran Teraso , 1 PC : 2 Batu Teraso, tebal 10 mm 117,455
S-147 m2 Memasang Plesteran Ciprat 1 PC : 2 PP 46,921
S-148 m2 Memasang finishing siar pasangan dinding bata merah (=20 m’) 26,970
S-149 m2 Memasang finishing siar pasangan dinding conblock ekspose (=8 m’) 12,870
S-150 m2 Plesteran siar adukan 1 Pc : 2 Ps 31,976
S-151 m2 Memasang acian 34,575
S-152 m2 Plesteran beton 1 Pc : 3 Ps, tebal 15 mm 62,051
S-153 m2 Plesteran batu kali 1pc:1/2kp:5ps tebal 10 mm 71,484
S-154 m2 Plesteran batu kali 1pc:3ps 76,255
S-155 m2 Plesteran batu kali 1pc:4ps 74,494
S-156 m2 Plesteran K- 50, tebal 20 mm 76,736
S-157 m2 Memasang lantai ubin PC abu-abu ukuran (40 x 40) cm 99,448
S-158 m2 Memasang lantai ubin PC abu-abu ukuran (30 x 30) cm 101,321
S-159 m2 Memasang lantai ubin PC abu-abu ukuran (20 x 20) cm 103,235
S-160 m2 Memasang lantai ubin warna ukuran (40 x 40) cm 198,508
S-161 m2 Memasang lantai ubin warna ukuran (30 x 30) cm 203,943

Software RAB Exarch xPro 204/396


S-162 m2 Memasang lantai ubin warna ukuran (20 x 20) cm 207,035
S-163 m2 Memasang lantai ubin teraso ukuran (40 x 40) cm 235,636
S-164 m2 Memasang lantai ubin teraso ukuran (30 x 30) cm 241,334
S-165 m2 Memasang lantai ubin granit ukuran (40 x 40) cm 384,148
S-166 m2 Memasang lantai ubin granit ukuran (30 x 30) cm 390,896
S-167 m2 Memasang lantai ubin teralux ukuran (40 x 40) cm 164,562
S-168 m2 Memasang lantai ubin teralux ukuran (30 x 30) cm 169,757
S-169 m2 Memasang lantai ubin teralux marmer ukuran (60 x 60) cm 405,399
S-170 m2 Memasang lantai ubin teralux marmer ukuran (40 x 40) cm 388,391
S-171 m2 Memasang lantai ubin teralux marmer ukuran (30 x 30) cm 395,169
S-172 m1 Memasang plint ubin PC abu-abu ukuran (15 x 20) cm 40,640
S-173 m1 Memasang plint ubin PC abu-abu ukuran (10 x 30) cm 33,657
S-174 m1 Memasang plint ubin PC abu-abu ukuran (10 x 40) cm 30,577
S-175 m1 Pasang plint ubin PC abu-abu ukuran 10 x 20 cm 51,398
S-176 m1 Memasang plint ubin PC warna ukuran (10 x 20) cm 51,822
S-177 m1 Memasang plint ubin PC warna ukuran (10 x 30) cm 42,087
S-178 m1 Memasang plint ubin PC warna ukuran (10 x 40) cm 37,247
S-179 m1 Memasang plint ubin teraso ukuran (10 x 30) cm 38,910
S-180 m1 Memasang plint ubin teraso ukuran (10 x 40) cm 34,862
S-181 m1 Memasang plint ubin granit ukuran (10 x 40) cm 54,472
S-182 m1 Memasang plint ubin granit ukuran (10 x 30) cm 65,032
S-183 m1 Memasang plint ubin teralux kerang ukuran (10 x 40) cm 38,572
S-184 m1 Memasang plint ubin teralux kerang ukuran (10 x 30) cm 43,852
S-185 m1 Memasang plint ubin teralux marmer ukuran (10 x 60) cm 44,772
S-186 m1 Memasang plint ubin teralux marmer ukuran (10 x 40) cm 57,122
S-187 m1 Memasang plint ubin teralux marmer ukuran (10 x 30) cm 68,562
S-188 m2 Memasang lantai teraso cor ditempat, tebal 3 cm 89,910
S-189 m2 Memasang lantai keramik artistik ukuran (10 x 20) cm 228,957
S-190 m2 Memasang lantai keramik artistik ukuran (10 x 10) cm atau (5 x 20) cm 235,707
S-191 m2 Memasang lantai keramik ukuran (33 x 33) cm 168,982
S-192 m2 Memasang lantai keramik ukuran (30 x 30) cm 169,220
S-193 m2 Memasang lantai keramik ukuran (20 x 20) cm 171,420
S-194 m2 Memasang lantai keramik ukuran (10 x 33) cm, variasi/border 265,605
S-195 m2 Memasang lantai mosaik ukuran (30 x 30) cm, campuran spesi 1 PC : 3 PP 388,908
S-196 m1 Memasang plint keramik artisitk ukuran (10 x 20) cm 79,847
S-197 m1 Memasang plint keramik artisitik ukuran (10 x 10) cm 138,522
S-198 m1 Memasang plint keramik ukuran (5 x 20) cm 78,544
S-199 m1 Pasang plint keramik ukuran 10 x 40 cm 38,650
S-200 m1 Pasang plint keramik ukuran 10 x 30 cm 39,624
S-201 m1 Memasang plint internal cove artistik ukuran (5 x 5 x 20) cm 62,422
S-202 m2 Memasang lantai marmer ukuran (100 x 100) cm 615,097
S-203 m2 Memasang lantai karpet 639,415
S-204 m2 Memasang underlayer 128,535
S-205 m2 Memasang lantai parquet 129,925
S-206 m2 Memasang lantai kayu (gym floor) 259,075
S-207 m2 Memasang dinding porselen ukuran (11 x 11) cm 332,140
S-208 m2 Memasang dinding porselin ukuran (10 x 20) cm 337,605
S-209 m2 Memasang dinding porselin ukuran (20 x 20) cm 325,455
S-210 m2 Memasang dinding keramik ukuran (10 x 20) cm 274,005
S-211 m2 Memasang dinding marmer ukuran (100 x 100) cm 781,647
S-212 m2 Memasang dinding bata pelapis ukuran (3 x 7 x 24) cm 256,497
S-213 m2 Memasang dinding batu paras 245,925
S-214 m2 Memasang dinding batu tempel hitam 333,925
S-215 m2 Memasang lantai vinyl ukuran (30 x 30) cm KL I 260,449
S-216 m2 Memasang wall paper, lebar 50 cm 141,452

Software RAB Exarch xPro 205/396


S-217 m2 Memasang floor hardener 43,860
S-218 m1 Memasang plint kayu kelas II ukuran (2 x 10) cm 36,460
S-219 m1 Pasang keramik stepnosing granito 7/30 55,672
S-220 m1 Pasang list keramik dinding 5/20 77,872
S-221 m1 Memasang hospital plint panjang 20 cm 85,147
S-222 m1 Memasang hospital plint panjang 30 cm 37,785
S-223 m2 Pasang conblock tipe segi-empat, uni, segi-enam abu-abu 8 cm, K-400 91,875
S-224 m2 Pasang conblock tipe uni, segi-empat abu-abu 8 cm, K-300 91,875
S-225 m2 Pasang conblock tipe segi-empat abu-abu 6 cm, K-200 91,875
S-226 m2 Pasang conblock tipe segi-empat abu-abu 8 cm, K-200 91,875
S-227 m2 Pasang conblock tipe segi-enam abu-abu 6 cm, K-200 91,875
S-228 m2 Pasang conblock tipe segi-enam abu-abu 8 cm, K-200 91,875
S-229 m2 Pasang conblock tipe segi-empat, uni, segi-enam warna 8 cm, K-400 91,875
S-230 m2 Pasang conblock tipe uni, segi-empat warna 8 cm, K-300 91,875
S-231 m2 Pasang conblock tipe segi-empat warna 6 cm, K-200 91,875
S-232 m2 Pasang conblock tipe segi-empat warna 8 cm, K-200 91,875
S-233 m2 Pasang conblock tipe segi-enam warna 6 cm, K-200 91,875
S-234 m2 Pasang conblock tipe segi-enam warna 8 cm, K-200 91,875
S-235 m2 Pasang grassblock bulat tebal 10 cm 130,875
S-236 m2 Pasang grassblock tebal 10 cm 130,875
S-237 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu jati (klas plitur) 15,329,000
S-238 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu jati lokal 13,129,000
S-239 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu kamper 10,149,750
S-240 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu bengkirai 10,179,750
S-241 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu kruing 8,079,750
S-242 m2 Membuat dan memasang pintu klamp, kayu jati (klas plitur) 535,080
S-243 m2 Membuat dan memasang pintu klamp, kayu jati (lokal) 535,080
S-244 m2 Membuat dan memasang pintu klamp, kayu kamper 404,080
S-245 m2 Membuat dan memasang pintu klamp, kayu bengkirai 405,080
S-246 m2 Membuat dan memasang pintu klamp, kayu kruing 335,080
S-247 m2 Membuat dan memasang daun pintu panel, kayu jati (klas plitur) 825,750
S-248 m2 Membuat dan memasang daun pintu panel, kayu jati (lokal) 825,750
S-249 m2 Membuat dan memasang daun pintu panel, kayu kamper 694,750
S-250 m2 Membuat dan memasang daun pintu panel, kayu bengkirai 695,750
S-251 m2 Membuat dan memasang daun pintu panel, kayu kruing 625,750
S-252 m2 Membuat dan memasang pintu dan jendela kaca, kayu jati (klas plitur) 583,300
S-253 m2 Membuat dan memasang pintu dan jendela kaca, kayu jati (lokal) 583,300
S-254 m2 Membuat dan memasang pintu dan jendela kaca, kayu kamper 504,700
S-255 m2 Membuat dan memasang pintu dan jendela kaca, kayu bengkirai 505,300
S-256 m2 Membuat dan memasang pintu dan jendela kaca, kayu kruing 463,300
S-257 m2 Membuat dan memasang pintu dan jendela jalusi kayu jati (klas plitur) 1,053,750
S-258 m2 Membuat dan memasang pintu dan jendela jalusi kayu jati (lokal) 1,053,750
S-259 m2 Membuat dan memasang pintu dan jendela jalusi kayu kamper 844,150
S-260 m2 Membuat dan memasang pintu dan jendela jalusi kayu bengkirai 845,750
S-261 m2 Membuat dan memasang pintu dan jendela jalusi kayu kruing 733,750
S-262 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu jati lokal ( 642,180
S-263 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kamper (le 560,305
S-264 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu bengkirai ( 560,930
S-265 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kruing (leb 517,180
S-266 m2 Memasang jalusi kusen, kayu jati (klas plitur) 922,450
S-267 m2 Memasang jalusi kusen, kayu jati (lokal) 922,450
S-268 m2 Memasang jalusi kusen, kayu kamper 725,950
S-269 m2 Memasang jalusi kusen, kayu bengkirai 727,450
S-270 m2 Memasang jalusi kusen, kayu kruing 622,450
S-271 m2 Pasang pintu teakwood rangkap, rangka kayu jati (lokal) 547,355

Software RAB Exarch xPro 206/396


S-272 m2 Pasang pintu teakwood rangkap, rangka kayu kamper 483,165
S-273 m2 Pasang pintu teakwood rangkap, rangka kayu bengkirai 483,655
S-274 m2 Pasang pintu teakwood rangkap, rangka kayu kruing 449,355
S-275 m2 Memasang teakwood rangkap lapis formika, rangka expose kayu kamper 643,185
S-276 m2 Memasang teakwood rangkap lapis formika, rangka expose kayu bengkirai 643,810
S-277 m2 Memasang teakwood rangkap lapis formika, rangka expose kayu kruing 600,060
S-278 m3 Memasang konstruksi kuda-kuda konvensional, kayu jati (klas plitur) bentang 6 mete 12,534,500
S-279 m3 Memasang konstruksi kuda-kuda konvensional, kayu jati (lokal) bentang 6 meter 10,334,500
S-280 m3 Memasang konstruksi kuda-kuda konvensional, kayu kamper bentang 6 meter 8,932,000
S-281 m3 Memasang konstruksi kuda-kuda konvensional, kayu bengkirai bentang 6 meter 8,959,500
S-282 m3 Memasang konstruksi kuda-kuda konvensional, kayu kruing bentang 6 meter 7,034,500
S-283 m3 Memasang konstruksi kuda-kuda konvensional, kayu glugu bentang 6 meter 3,844,500
S-284 m3 Memasang konstruksi kuda-kuda expose, kayu jati (klas plitur) 14,670,475
S-285 m3 Memasang konstruksi kuda-kuda expose, kayu jati lokal 12,270,475
S-286 m3 Memasang konstruksi kuda-kuda expose, kayu kamper 10,740,475
S-287 m3 Memasang konstruksi kuda-kuda expose, kayu kruing 8,670,475
S-288 m3 Memasang konstruksi kuda-kuda expose, kayu bengkirai 10,770,475
S-289 m3 Memasang konstruksi gordeng, kayu jati (klas plitur) 11,766,700
S-290 m3 Memasang konstruksi gordeng, kayu jati lokal 9,566,700
S-291 m3 Memasang konstruksi gordeng, kayu kamper 8,164,200
S-292 m3 Memasang konstruksi gordeng, kayu bengkirai 8,191,700
S-293 m3 Memasang konstruksi gordeng, kayu kruing 6,266,700
S-294 m3 Memasang konstruksi gordeng, kayu glugu 3,076,700
S-295 m2 Memasang usuk jati (lokal) 5/7, reng jati (lokal) 2/3 127,825
S-296 m2 Memasang usuk kamper 5/7, reng jati (lokal) 2/3 104,725
S-297 m2 Memasang usuk kamper 5/7, reng kamper 2/3 95,725
S-298 m2 Memasang usuk bengkirai 5/7, reng jati (lokal) 2/3 104,725
S-299 m2 Memasang usuk bengkirai 5/7, reng bengkirai 2/3 97,525
S-300 m2 Memasang usuk kruing 5/7, reng jati (lokal) 2/3 89,325
S-301 m2 Memasang usuk kruing 5/7, reng kruing 2/3 77,325
S-302 m2 Memasang usuk jati 5/7 (klas 1), reng jati 3/4 (klas 1) 191,525
S-303 m2 Memasang usuk kamper 5/7, reng jati (lokal) 3/4 134,425
S-304 m2 Memasang usuk kamper 5/7, reng kamper 3/4 116,425
S-305 m2 Memasang usuk bengkirai 5/7, reng jati (lokal) 3/4 134,425
S-306 m2 Memasang usuk bengkirai 5/7, reng bengkirai 3/4 120,025
S-307 m2 Memasang usuk kruing 5/7, reng jati (lokal) 3/4 119,025
S-308 m2 Memasang usuk kruing 5/7, reng kruing 3/4 95,025
S-309 m2 Memasang rangka atap sirap, kayu jati (lokal) 1,267,610
S-310 m2 Memasang rangka atap sirap, kayu kamper 1,057,235
S-311 m2 Memasang rangka atap sirap, kayu bengkirai 1,061,360
S-312 m2 Memasang rangka atap sirap, kayu kruing 772,610
S-313 m2 Memasang rangka langit-langit (50 x 100) cm, kayu jati (lokal) 237,065
S-314 m2 Memasang rangka langit-langit (50 x 100) cm, kayu kamper 161,990
S-315 m2 Memasang rangka langit-langit (50 x 100) cm, kayu bengkirai 162,375
S-316 m2 Memasang rangka langit-langit (50 x 100) cm, kayu kruing 135,425
S-317 m2 Memasang rangka langit-langit (60 x 60) cm, kayu jati (lokal) 240,530
S-318 m2 Memasang rangka langit-langit (60 x 60) cm, kayu kamper 161,068
S-319 m2 Memasang rangka langit-langit (60 x 60) cm, kayu bengkirai 161,475
S-320 m2 Memasang rangka langit-langit (60 x 60) cm, kayu kruing 132,950
S-321 m2 Memasang rangka langit-langit (60 x 120) cm, kayu jati (lokal) 147,573
S-322 m2 Memasang rangka langit-langit (60 x 120) cm, kayu kamper 130,998
S-323 m2 Memasang rangka langit-langit (60 x 120) cm, kayu bengkirai 131,323
S-324 m2 Memasang rangka langit-langit (60 x 120) cm, kayu kruing 108,573
S-325 m2 Memasang rangka langit-langit (1,00 x 1,00) m, kayu jati (lokal) 135,388
S-326 m2 Memasang rangka langit-langit (1,00 x 1,00) m, kayu kamper 120,088

Software RAB Exarch xPro 207/396


S-327 m2 Memasang rangka langit-langit (1,00 x 1,00) m, kayu bengkirai 120,388
S-328 m2 Memasang rangka langit-langit (1,00 x 1,00) m, kayu kruing 99,388
S-329 m2 Memasang lisplank ukuran (3 x 20) cm, kayu jati (klas plitur) 102,825
S-330 m2 Memasang lisplank ukuran (3 x 20) cm, kayu jati (lokal) 102,825
S-331 m2 Memasang lisplank ukuran (3 x 20) cm, kayu kamper 79,245
S-332 m2 Memasang lisplank ukuran (3 x 20) cm, kayu bengkirai 79,425
S-333 m2 Memasang lisplank ukuran (3 x 20) cm, kayu kruing 66,825
S-334 m1 Memasang lisplank ukuran (3 x 30) cm, kayu jati (klas plitur) 138,175
S-335 m1 Memasang lisplank ukuran (3 x 30) cm, kayu ati (lokal) 138,175
S-336 m1 Memasang lisplank ukuran (3 x 30) cm, kayu kamper 102,150
S-337 m1 Memasang lisplank ukuran (3 x 30) cm, kayu kelas bengkirai 102,425
S-338 m1 Memasang lisplank ukuran (3 x 30) cm, kayu kruing 83,175
S-339 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu jati (klas plitur) 182,138
S-340 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu jati (lokal) 182,138
S-341 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu kamper 134,650
S-342 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu bengkirai 135,013
S-343 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu kruing 109,638
S-344 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu jati (klas plitur) 104,125
S-345 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu jati (lokal) 104,125
S-346 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu kamper 75,960
S-347 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu bengkirai 76,175
S-348 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu kruing 61,125
S-349 m1 Memasang lisplank ukuran (2 x 25) cm, kayu jati (klas plitur) 79,425
S-350 m1 Memasang lisplank ukuran (2 x 25) cm, kayu jati (lokal 79,425
S-351 m1 Memasang lisplank ukuran (2 x 25) cm, kayu kamper 59,775
S-352 m1 Memasang lisplank ukuran (2 x 25) cm, kayu bengkirai 59,925
S-353 m1 Memasang lisplank ukuran (2 x 25) cm, kayu kruing 49,425
S-354 m1 Memasang lisplank ukuran (2 x 20) cm, kayu jati (klas plitur) 68,025
S-355 m1 Memasang lisplank ukuran (2 x 20) cm, kayu jati (lokal) 68,025
S-356 m1 Memasang lisplank ukuran (2 x 20) cm, kayu kamper 52,305
S-357 m1 Memasang lisplank ukuran (2 x 20) cm, kayu bengkirai 52,425
S-358 m1 Memasang lisplank ukuran (2 x 20) cm, kayu kruing 44,025
S-359 m2 Membuat listplank asbes plat ram kayu jati (lokal) 490,000
S-360 m2 Membuat listplank asbes plat ram kayu kamper 433,125
S-361 m2 Membuat listplank asbes plat ram kayu bengkirai 484,750
S-362 m2 Membuat listplank asbes plat ram kayu kruing 390,000
S-363 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu jati (lokal) 324,530
S-364 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu kamper 244,030
S-365 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu bengkirai 244,730
S-366 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu kruing 195,730
S-367 m2 Memasangdinding pemisah teakwood rangkap, rangka kayu jati (lokal) 392,010
S-368 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu kamper 311,510
S-369 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu bengkirai 312,210
S-370 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu kruing 263,210
S-371 m2 Memasang dinding pemisah plywood rangkap, rangka kayu kamper 350,580
S-372 m2 Memasang dinding pemisah plywood rangkap, rangka kayu bengkirai 351,280
S-373 m2 Memasang dinding pemisah plywood rangkap, rangka kayu kruing 302,280
S-374 m2 Memasang dinding lambriziring dari papan kayu jati (klas plitur) 334,650
S-375 m2 Memasang dinding lambriziring dari papan kayu jati (lokal) 334,650
S-376 m2 Memasang dinding lambriziring dari papan kayu kamper 311,725
S-377 m2 Memasang dinding lambriziring dari papan kayu bengkirai 311,900
S-378 m2 Memasang dinding lambriziring dari papan kayu kruing 299,650
S-379 m2 Memasang dinding lambriziring dari plywood ukuran (120 x 240) cm 48,185
S-380 m2 Memasang dinding bilik, rangka kayu kruing 207,475
S-381 m1 Mengerjakan papan ruiter kayu jati 2/20 (lokal) 50,339

Software RAB Exarch xPro 208/396


S-382 m1 Mengerjakan papan ruiter kayu kamper 2/20 37,239
S-383 m1 Mengerjakan papan ruiter kayu bengkirai 2/20 37,339
S-384 m1 Mengerjakan papan ruiter kayu kruing 2/20 30,339
S-385 m2 Pasang plywood tebal 4 mm, untuk dinding 48,241
S-386 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu jati (lokal) tanpa plepet 171,665
S-387 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kamper tanpa plepet 156,365
S-388 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu bengkirai tanpa plepet 156,665
S-389 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kruing tanpa plepet 135,665
S-390 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu jati (lokal) memakai plepet 177,485
S-391 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kamper memakai plepet 162,185
S-392 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu bengkirai memakai plepet 162,485
S-393 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kruing memakai plepet 141,485
S-394 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu jati (lokal) 221,053
S-395 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu kamper 204,478
S-396 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu bengkirai 204,803
S-397 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu kruing 182,053
S-398 m2 Langit-langit gypsum board tebal 9 mm, rangka hollow 227,995
S-399 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu jati (lokal) 213,853
S-400 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu kamper 197,278
S-401 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu bengkirai 197,603
S-402 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu kruing 174,853
S-403 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka hollow 220,795
S-404 m2 Memasang langit-langit asbes semen, tebal 4 mm 32,970
S-405 m2 Memasang langit-langit asbes semen, tebal 5 mm 36,270
S-406 m2 Memasang langit-langit asbes semen, tebal 6 mm 39,020
S-407 m2 Memasang langit-langit akustik ukuran (30 x 30) cm 446,010
S-408 m2 Memasang langit-langit akustik ukuran (30 x 60) cm 340,825
S-409 m2 Memasang langit-langit akustik ukuran (60 x 120) cm 213,825
S-410 m2 Memasanglangit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm 53,340
S-411 m2 Memasanglangit-langit tripleks ukuran (120 x 240) cm, tebal 4 mm 53,340
S-412 m2 Memasanglangit-langit tripleks ukuran (120 x 240) cm, tebal 6 mm 53,340
S-413 m2 Memasang langit-langit lambriziring kayu, tebal 9 mm 220,080
S-414 m2 Memasang langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm 46,926
S-415 m2 Memasang langit-langit akustik ukuran (60 x 120) cm + rangka alluminium 361,470
S-416 m1 Memasang ist langit-langit kayu profil 13,819
S-417 m1 Pasang list profil cornees gypsum lebar sampai 5 cm 47,623
S-418 m1 Pasang list profil cornees gypsum lebar 5 - 10 cm 48,337
S-419 m1 Pasang list profil cornees gypsum lebar lebih dari 10 cm 49,346
S-420 m2 Mengerjakan Ukiran Gaya Yogyakarta dengan kedalaman 1 cm, tidak berlubang 3,468,970
S-421 m3 Memasang usuk peniung, kayu jati (klas plitur) 10,919,000
S-422 m2 Pasang Atap Genteng Palentong Kecil 85,430
S-423 m2 Pasang genteng paris 50,350
S-424 m2 Pasang genteng beton besar Natural ( isi 9 / m2 ) 55,100
S-425 m1 Pasang Genteng Bubung Palentong 85,930
S-426 m1 Pasang Nok Genteng Beton 108,600
S-427 m1 Pasang bubungan genteng paris 179,005
S-428 m2 Pasang Atap Asbes Gelombang ( 2.50 x 0.92 m ) X 5mm 78,520
S-429 m2 Pasang Atap Asbes Gelombang ( 2.25 x 0.92 m ) X 5mm 89,520
S-430 m2 Pasang Atap Asbes Gelombang ( 2.00 x 0.92 m ) X 5mm 88,685
S-431 m2 Pasang Atap Asbes Gelombang ( 1.80 x 0.92 m ) X 5mm 105,185
S-432 m2 Pasang Atap Asbes Gelombang ( 300 x 1.05 m ) X 4mm 61,185
S-433 m2 Pasang Atap Asbes Gelombang ( 270 x 1.05 m ) X 4mm 68,885
S-434 m2 Pasang Atap Asbes Gelombang ( 240 x 1.05 m ) X 4mm 70,785
S-435 m2 Pasang Atap Asbes Gelombang ( 210 x 1.05 m ) X 4mm 78,485
S-436 m2 Pasang Atap Asbes Gelombang ( 1.5 x 1.05 m ) X 4mm 110,385

Software RAB Exarch xPro 209/396


S-437 m2 Pasang Atap Asbes Gelombang ( 3.00 x 1.08 m ) X 6mm 63,085
S-438 m2 Pasang Atap Asbes Gelombang ( 2.7 x 1.08 m ) X 6mm 64,185
S-439 m2 Pasang Atap Asbes Gelombang ( 2.4 x 1.08 m ) X 6mm 72,985
S-440 m2 Pasang Atap Asbes Gelombang ( 2.1 x 1.08 m ) X 6mm 76,285
S-441 m2 Pasang Atap Asbes Gelombang ( 1.80 x 1.08 m ) X 6mm 85,085
S-442 m1 Pasang Nok Stel Gelombang 0.92m 271,930
S-443 m1 Pasang Nok Stel Gelombang 1.05m 249,730
S-444 m1 Pasang Nok Stel Gelombang 1.08m 246,030
S-445 m1 Pasang Nok Paten 0.92m 144,130
S-446 m1 Pasang Nok Paten 1.05m 144,130
S-447 m1 Pasang Nok Paten 1.08m 144,130
S-448 m1 Pasang Nok Stel rata 0.92m 158,690
S-449 m1 Pasang Nok Stel rata 1.05m 154,830
S-450 m2 Pasang Nok Atap Seng 32,525
S-451 m2 Pasang Atap Alluminium 184,555
S-452 m2 Pasang Nok Alluminium 209,490
S-453 m2 Pasang Alluminium Foil / Sisalation 51,375
S-454 m2 Pasang Atap Genteng Aspal 118,325
S-455 m2 Pasang Atap Genteng Metal 69,385
S-456 m2 Pasang Atap Genteng Kodok / Glazzur 60,430
S-457 m2 Pasang Atap Genteng Palentong Super / Besar 63,130
S-458 m2 Pasang Atap Sirap 289,040
S-459 m1 Pasang Genteng Bubung Kodok Glazzur 83,430
S-460 m1 Pasang Genteng Bubung Palentong Besar 83,930
S-461 m1 Pasang Rooflight Fiberglass ( 180 x 90 ) cm 104,995
S-462 m1 Pasang Nok Genteng Aspal 103,910
S-463 m1 Pasang Nok Genteng Metal 120,180
S-464 m1 Pasang Nok Sirap 85,145
S-465 m2 Pasang Atap Seng Gelombang 67,680
S-466 m2 Pasang genteng paris untuk rumah tingkat 59,775
S-467 m2 Pasang genteng beton besar Natural ( isi 9 / m2 ) untuk rumah tingkat 64,525
S-468 m2 Pasang genteng beton besar Warna ( isi 9 / m2 ) 57,350
S-469 m2 Pasang genteng beton besar Warna ( isi 9 / m2 ) untuk rumah tingkat 66,775
S-470 m2 Pasang genteng keramik berglasir KIA, Kanmuri Natural 124,600
S-471 m2 Pasang genteng keramik berglasir KIA, Kanmuri Natural untuk rumah tingkat 79,650
S-472 m2 Pasang bubungan genteng beton Warna 162,005
S-473 m2 Pasang bubungan genteng keramik berglasir KIA, Kanmuri Natural 184,005
S-474 m2 Pasang atap metal gelombang 95,670
S-475 m1 Pasang nok genteng metal U type prima roof 123,330
S-476 m2 Pasang atap polikarbonat 271,188
S-477 m2 Mengikis / Mengerok Permukaan Cat Tembok Lama 15,463
S-478 m2 Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual 13,773
S-479 m2 Mendempul dan Menggosok Kayu 12,566
S-480 m2 Pengecatan Bidang Kayu Lama 31,798
S-481 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Pe 33,633
S-482 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Pe 48,333
S-483 m2 Pelaburan Bidang Kayu dengan Teak Oil 25,553
S-484 m2 Pelaburan Bidang Kayu dengan Pelitur 34,133
S-485 m2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter 12,585
S-486 m2 Pelaburan Bidang Kayu dengan Vernis 52,173
S-487 m2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) 22,508
S-488 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 17,333
S-489 m2 Melabur tembok dengan kalkarium 8,198
S-490 m2 Melabur Tembok dengan Kapur Sirih 18,495
S-491 m2 Melabur Tembok Lama dengan Kapur Sirih ( untuk pemeliharaan ) 11,098

Software RAB Exarch xPro 210/396


S-492 m2 Pengecatan Permukaan Baja dengan Meni Besi 29,720
S-493 m2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah 54,383
S-494 m2 Pemasangan Wall Paper 73,463
S-495 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 4 Lapis Ca 17,907
S-496 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 1 Lapis Ca 18,420
S-497 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 3 Lapis Ca 223,140
S-498 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Semprot ( Airless Spray ) 190,500
S-499 m2 Mencuci Bidang Permukaan Tembok yang Pernah dicat 13,773
S-500 m2 Mengerok Karat atau Cat Lama Permukaan Baja dgn Pancar Pasir ( Sanblasting ) dgn 852,500
S-501 m2 Menyabun Permukaan Tembok Lama 13,773
S-502 m2 Pengecatan tembok tidak terlindung dari panas dan hujan 34,208
S-503 m2 Pengecatan bidang besi ( 3 x ) 38,835
S-504 m2 Pengetiran kayu ( 2 x ) 12,400
S-505 m2 Pekerjaan cat duco 3 x 84,745
S-506 m2 Mengecat genteng 31,008
S-507 m2 Mengecat kerb 3 kali 73,195
S-508 m2 Memasang Prodo Mas 24 karat 5,048,651
S-509 m2 Mengerjakan Cat Sungging 635,686
S-510 bh Memasang Kloset Duduk / Monoblok 2,935,250
S-511 bh Memasang Kloset Jongkok Porselen 749,950
S-512 bh Memasang Kloset Jongkok Teraso 565,250
S-513 bh Memasang Urinoir 1,703,850
S-514 bh Memasang Wastafel 1,378,350
S-515 bh Memasang Bak Mandi Fiberglass, volume 0.30 m³ 889,350
S-516 bh Memasang Badkip Porselen 316,250
S-517 bh Memasang Bak Fiberglass volume 1 m³ air 1,356,500
S-518 m1 Memasang Pipa Penyalur Air limbah jenis Pipa Tanah Ø15 cm 89,812
S-519 m1 Memasang Pipa Penyalur Air limbah jenis Pipa Tanah Ø 20 cm 94,596
S-520 m1 Memasang Pipa Beton Ø 5 cm - 20 cm 116,321
S-521 m1 Memasang Pipa Beton Ø 30 cm - 100 cm 375,410
S-522 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t = 35 cm 554,685
S-523 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50 cm 471,835
S-524 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (60 x 60 )cm, t = 65 cm 727,578
S-525 m1 Memasang Pipa Galvanis Ø ½" 52,135
S-526 m1 Memasang Pipa Galvanis Ø ¾" 58,135
S-527 m1 Memasang Pipa Galvanis Ø 1" 74,935
S-528 m1 Memasang Pipa Galvanis Ø 1½" 129,079
S-529 m1 Memasang Pipa Galvanis Ø 3" 157,879
S-530 m1 Memasang Pipa Galvanis Ø 4" 206,408
S-531 m1 Memasang Pipa PVC tipe AW Ø ½" 22,093
S-532 m1 Memasang Pipa PVC tipe AW Ø ¾" 23,893
S-533 m1 Memasang Pipa PVC tipe AW Ø 1" 24,493
S-534 m1 Memasang Pipa PVC tipe AW Ø 1½" 25,093
S-535 m1 Memasang Pipa PVC tipe AW Ø 2" 30,874
S-536 m1 Memasang Pipa PVC tipe AW Ø 2½" 26,293
S-537 m1 Memasang Pipa PVC tipe AW Ø 3" 39,769
S-538 m1 Memasang Pipa PVC tipe AW Ø 4" 47,044
S-539 bh Memasang Bak Cuci Piring Stainles Steel 543,328
S-540 bh Memasang Bak Cuci Piring Teraso 606,963
S-541 bh Memasang Kran Ø ¾" atau ½" 38,388
S-542 bh Memasang Floor Drain 73,275
S-543 bh Memasang Bak Mandi Teraso, volume 0.30 m3 480,700
S-544 bh Memasang bak mandi batu bata volume 0,30 m3 3,693,000
S-545 bh Membuat bak beton volume 1 m3 air 4,374,700
S-546 kg Memasang besi profil 34,106

Software RAB Exarch xPro 211/396


S-547 kg Mengerjakan pekerjaan perakitan 83,575
S-548 m2 Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku 761,930
S-549 cm Mengerjakan pengelasan dengan las listrik 89,520
S-550 m2 Membuat rangka jendela besi square tube (25 x 5) cm 555,550
S-551 m2 Memasang pintu rolling door besi 791,110
S-552 m2 Memasang pintu lipat (Folding door) 592,070
S-553 m2 Memasang sunscreen alluminium 349,540
S-554 m2 Memasang rolling door alluminium 729,250
S-555 m1 Memasang kusen pintu alluminium 157,192
S-556 m2 Memasang pintu alluminium strip lebar 8 cm 924,722
S-557 m2 Memasang pintu kaca rangka alluminium 2,349,360
S-558 m2 Memasang venetions blinds dan Vertical blinds 148,330
S-559 m2 Memasang terali besi strip (2 x 3) mm 548,428
S-560 m2 Memasang kawat nyamuk dengan plepet baja strip 105,570
S-561 m2 Pasang kawat nyamuk dengan plepet kayu 44,968
S-562 m2 Memasang jendela nako & tralis 193,185
S-563 m1 Memasang talang 1/2 lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm 97,215
S-564 m1 Pasang talang datar, seng BJLS 28, papan kayu jati 192,534
S-565 m1 Pasang talang datar, seng BJLS 28, papan kayu jati (lokal) 192,534
S-566 m1 Pasang talang datar, seng BJLS 28, papan kayu kamper 161,094
S-567 m1 Pasang talang datar, seng BJLS 28, papan kayu kruing 144,534
S-568 m1 Pasang talang datar, seng BJLS 28, papan kayu bengkirai 161,334
S-569 m1 Pasang talang miring, seng BJLS 28 papan kayu jati (klas 1) 304,734
S-570 m1 Pasang talang miring, seng BJLS 28, papan kayu jati (lokal) 272,484
S-571 m1 Pasang talang miring, seng BJLS 28, papan kayu kamper 210,259
S-572 m1 Pasang talang miring, seng BJLS 28, papan kayu kruing 177,484
S-573 m1 Pasang talang miring, seng BJLS 28, papan kayu bengkirai 210,734
S-574 m1 Pasang talang torong 1,152,850
S-575 m2 Pasang jendela besi 1,100,021
S-576 m2 Pasang jendela besi tahan api 1,124,180
S-577 m2 Pasang pintu alumunium 486,812
S-578 m2 Pasang kawat harmonika 77,968
S-579 m2 Pasang kawat kassa 44,968
S-580 m2 Pasang kawat burung 48,818
S-581 bh Pasang kunci Tanam Antik 324,655
S-582 bh Pasang kunci Tanam Biasa 183,275
S-583 bh Pasang kunci Tanam Kamar Mandi 101,638
S-584 bh Pasang kunci Silinder 126,221
S-585 bh Pasang Engsel Pintu 35,664
S-586 bh Pasang Engsel Jendela Kupu - kupu 21,443
S-587 bh Buah Pasang Engsel Angin 34,550
S-588 bh Pasang Spring Knip 26,164
S-589 bh Pasang Kait angin 24,164
S-590 bh Pasang Door Closer 312,213
S-591 bh Pasang kunci selot 74,885
S-592 bh Pasang pegangan pintu / door holder 159,213
S-593 bh Pasang door stop 110,443
S-594 bh Pasang rel pintu dorong 274,655
S-595 bh Pasang kunci lemari 43,106
S-596 m2 Pasang kaca, tebal 3 mm 139,664
S-597 m2 Pasang kaca, tebal 5 mm 139,664
S-598 m2 Pasang kaca, tebal 8 mm 141,526
S-599 m2 Pasang kaca buram, tebal 12 mm 196,106
S-600 m2 Pasang kaca cermin, tebal 5 mm 184,214
S-601 m2 Pasang kaca cermin, tebal 6 mm 18,664

Software RAB Exarch xPro 212/396


S-602 m2 Pasang kaca cermin, tebal 8 mm 186,076
S-603 m2 Pasang kaca "wireglass", tebal 5 mm 277,164
S-604 m2 Pasang kaca patri, tebal 5 mm 112,164

Software RAB Exarch xPro 213/396


RENCANA ANGGARAN BIAYA
.ID :A002/T100.80/I-2020 Total RAB 722,863,124
Nama Project : Pembangunan Rumah Tinggal 2 Lantai Type 200
Lokasi : Jl. Ebony Raya No. 77, Komp. Villa Danau Matano, Kab. Luwu Timur
Tahun : 2020

ID. Pek Uraian Pekerjaan Volume Qty Harga Satuan Total

A PEKERJAAN PERSIAPAN
A01 Pembersihan Area/Lokasi Kerja 150.00 m2 17,750 2,662,500
A02 Pengukuran dan Pemasangan Bowplank 52.00 m1 90,125 4,686,500
A03 Pembuatan Gudang Bahan 1.00 Unit 8,092,696 8,092,696
A04 Pembuatan Direksi Ket/Bedeng Pekerja 1.00 Unit 8,147,696 8,147,696

Sub-total Pekerjaan A 23,589,393

B PEKERJAAN PONDASI
Pekerjaan Pondasi Tapak (Poer/Pile Cap)
B01 Pekerjaan Galian Pile Cap 12.30 m3 84,825 1,043,348
B02 Urugan Pasir Pile Cap 0.50 m3 267,350 133,675
B03 Pekerjaan Pembesian Pondasi Tapak 442.05 kg 12,327 5,448,871
B04 Pekerjan Bekisting Pondasi Tapak 25.20 m2 182,985 4,611,222
B05 Pekerjaan Cor Beton (K-225) 3.99 m3 975,620 3,892,724
Pekerjaan Pondasi Batu Kali
B06 Pekerjaan Galian Pondasi 46.89 m3 84,825 3,977,383
B07 Urugan Pasir Dibawah Pondasi Batu Kali 2.89 m3 267,350 773,818
B08 Pek. Pemasangan Batu Kosong (Aanstamping) 8.68 m3 504,765 4,382,975
B09 Pekerjaan Pasangan Batu Pondasi ( 1 : 3) 30.39 m3 913,900 27,774,518
Pekerjaan Pondasi Rollag Bata
B10 Pekerjaan Galian 0.34 m3 84,825 28,841
B11 Pek. Pasangan Pondasi Rollag 0.68 m1 32,901 22,373

Sub-total Pekerjaan B 52,089,748

C PEKERJAAN SLOOF
Pekerjaan Sloof Utama 25x35-K225
C01 Pekerjaan Pembesian 642.64 kg 12,327 7,921,497
C02 Pekerjaan Bekisting 38.40 m2 194,485 7,468,224
C03 Pekerjaan Cor Beton 3.84 m3 975,620 3,746,381
Pekerjaan Sloof Praktis/Support 15x20-K225
C04 Pekerjaan Pembesian 68.28 kg 12,327 841,711
C05 Pekerjaan Bekisting 6.40 m2 194,485 1,244,704
C06 Pekerjaan Cor Beton 0.48 m3 975,620 468,298

Sub-total Pekerjaan C 21,690,815

D PEKERJAAN TIMBUNAN
D01 Urugan, Timbunan dan Peninggian Elevasi 38.00 m3 219,350 8,335,300
D02 Pemadatan Tanah 4.56 m3 51,750 235,980

Sub-total Pekerjaan D 8,571,280

E PEKERJAAN KOLOM
Kolom Lantai 1
Pekerjaan Kolom Utama 20-2x25-K225
E01 Pekerjaan Pembesian (8d12&15-d8) 489.64 kg 12,327 6,035,492
E02 Pekerjaan Bekisting 50.40 m2 369,055 18,600,372
E03 Pekerjaan Cor Beton (K-225) 4.32 m3 975,620 4,214,679
Pekerjaan Kolom Praktis 13x15-K225
E04 Pekerjaan Pembesian (4d12&18 cm-d6) 190.11 kg 12,327 2,343,332

214/396
E05 Pekerjaan Bekisting 27.60 m2 369,055 10,185,918
E06 Pekerjaan Cor Beton (K-225) 1.04 m3 975,620 1,009,767
Kolom Lantai 2
Pekerjaan Kolom Utama 20-2x25-K225
E07 Pekerjaan Pembesian (8d12&15-d8) 494.72 kg 12,327 6,098,144
E08 Pekerjaan Bekisting 45.60 m2 369,055 16,828,908
E09 Pekerjaan Cor Beton (K-225) 3.42 m3 975,620 3,336,621
Pekerjaan Kolom Praktis 13x15-K200
E10 Pekerjaan Pembesian (4d12&18 cm-d6) 132.33 kg 12,327 1,631,206
E11 Pekerjaan Bekisting 19.20 m2 369,055 7,085,856
E12 Pekerjaan Cor Beton (K-200) 0.72 m3 975,620 702,446

Sub-total Pekerjaan E 78,072,740

F PEKERJAAN RINGBALOK (BALOK)


Ring Balok Lantai 1
Pek. Ring Balok Utama/Type Tumpuan, 20x30-K225
F01 Pekerjaan Pembesian (7d12&15-d8) 814.06 kg 12,327 10,034,555
F02 Pekerjaan Bekisting 44.80 m2 378,355 16,950,304
F03 Pekerjaan Cor Beton (K-225) 4.48 m3 975,620 4,370,778
Pekerjaan Ring Balok Praktis 13x15-K225
F04 Pekerjaan Pembesian (7d12&15-d8) 136.26 kg 12,327 1,679,632
F05 Pekerjaan Bekisting 12.80 m2 378,355 4,842,944
F06 Pekerjaan Cor Beton (K-225) 0.96 m3 975,620 936,595
Ring Balok Lantai 2
Pek. Ring Balok Utama/Type Tumpuan, 20x30-K225
F07 Pekerjaan Pembesian (7d12&15-d8) 506.89 kg 12,327 6,248,180
F08 Pekerjaan Bekisting 34.40 m2 378,355 13,015,412
F09 Pekerjaan Cor Beton (K-225) 4.30 m3 975,620 4,195,166
Pekerjaan Ring Balok Praktis 13x15-K225
F10 Pekerjaan Pembesian (7d12&15-d8) 106.52 kg 12,327 1,313,042
F11 Pekerjaan Bekisting 10.00 m2 378,355 3,783,550
F12 Pekerjaan Cor Beton (K-225) 0.75 m3 975,620 731,715
Sub-total Pekerjaan F 68,101,874

G PEKERJAAN COR PLATE BETON (DAK BETON)


Pekerjaan Pengecoran Plat Lantai Utama
G01 Pekerjaan Pembesian Plate lantai 1989.29 kg 12,327 24,521,015
G02 Pekerjaan Bekisting 90.00 m2 469,055 42,214,950
G03 Pekerjaan Cor Beton (K-225) 11.70 m3 975,620 11,414,755
Pekerjaan Pengecoran Plat Atap/Kanopi Teras
G04 Pekerjaan Pembesian Plat Atap/kanopi beton 48.07 kg 12,327 592,480
G05 Pekerjaan Bekisting 6.00 m2 469,055 2,814,330
G06 Pekerjaan Cor Beton (K-225) 0.60 m3 975,620 585,372

Sub-total Pekerjaan G 82,142,902

H PEKERJAAN DINDING
Dinding Lantai 1
Pekerjaan Pasangan Bata dan Plasteran 1
H01 Pek. Pasangan Bata Merah (1/2, Mix 1:5) 146.24 m2 109,334 15,989,004
H02 Pek. Pasangan Bata Merah Trassram (1/2, Mix 1:3) 14.62 m2 114,156 1,669,417
H03 Pekerjaan Plasteran (1.5 cm-mix 1:5) 292.48 m2 58,894 17,225,376
H04 Pekerjaan Acian 292.48 m2 34,575 10,112,496
Dinding Lantai 2
Pekerjaan Pasangan Bata dan Plasteran 2
H05 Pek. Pasangan Bata Merah (1/2, Mix 1:5) 134.00 m2 109,334 14,650,756
H06 Pek. Pasangan Bata Merah Trassram (1/2, Mix 1:3) 13.40 m2 114,156 1,529,690
H07 Pekerjaan Plasteran (1.5 cm-mix 1:5) 268.00 m2 58,894 15,783,646
H08 Pekerjaan Acian 268.00 m2 34,575 9,266,100

215/396
Sub-total Pekerjaan H 86,226,485

I PEKERJAAN ATAP
I01 Memasang Rangka Atap (Baja Ringan-Ex TASO) 161.55 m2 213,950 34,564,680
I02 Memasang Pelapis Atap (Metal Roof-Ex Sakura Roof 161.55 m2 178,985 28,915,912
I03 Memasang Nok Atap 26.91 m1 133,455 3,591,128
I04 Memasang Lisplank 50.00 m1 128,885 6,444,250
I05 Memasang Talang Air 50.00 m1 97,230 4,861,500

Sub-total Pekerjaan I 78,377,470

J PEKERJAAN PINTU, JENDELA DAN ACCESORIS


J01 Memasang Kusen+Panel Pintu Utama 2.00 unit 2,341,000 4,682,000
J02 Memasang Kusen+Panel Pintu Kamar/Ruangan 7.00 unit 1,841,000 12,887,000
J03 Memasang Kusen+Panel Pintu WC 3.00 unit 1,341,000 4,023,000
J04 Memasang Kusen+Panel Jendela Utama 4.00 unit 1,124,750 4,499,000
J05 Memasang Jendela Pencahayaan/ Tetap (Fixed Window) 3.00 unit 835,450 2,506,350
J06 Memasang Lubang Angin/Loster (Bovenlight) 28.00 unit 35,700 999,600

Sub-total Pekerjaan J 29,596,950

K PEKERJAAN INST. PIPA AIR BERSIH &SANITASI


Pekerjaan Instalasi Pemipaan Air Bersih
K01 Memasang Instalasi Pipa 3/4 PVC (Ex Maspion) 66.00 m1 23,930 1,579,380
K02 Memasang Instalasi Pipa 1/2 PVC (Ex Maspion) 35.00 m1 22,130 774,550
K03 Memasang Keran Air Standar ( Ex Onda) 6.00 bh 72,888 437,325
K04 Memasang Shower Mandi ( Ex TOTO) 4.00 Unit 1,471,503 5,886,012
K05 Memasang Tangki Air/Tandom (Ex Penguin-1000L) 1.00 unit 516,625 516,625
Pekerjaan Instalasi Air Limbah dan Sanitasi
K06 Memasang Instalasi Pipa Limbah 3" PVC (Ex Maspio 66.00 m1 39,750 2,623,500
K07 Memasang Instalasi Pipa Kloset 4" PVC (Ex Maspion) 36.00 m1 40,950 1,474,200
K08 Memasang Kloset Duduk ( Ex TOTO) 1.00 bh 2,936,600 2,936,600
K09 Memasang Kloset Jongkok ( Ex TOTO) 1.00 bh 547,450 547,450
K10 Memasang Wastafel Cuci 2.00 bh 1,370,950 2,741,900
K11 Memasang Floor Drain 3.00 bh 73,275 219,825
K12 Pekerjaan Septik Tank Double Kompartmen 1.00 unit 3,040,999 3,040,999
K13 Pekerjaan Sumur Resapan Limbah 1.00 Unit 1,471,503 1,471,503

Sub-total Pekerjaan K 24,249,869

L PEKERJAAN INST. LISTRIK DAN PENERANGAN


L01 Pemasangan MCB Pengaman dan Box 2.00 Unit 507,700 1,015,400
L02 Pemasangan Instalasi Pembumian (Grounding) 1.00 btg 807,700 807,700
L03 Pemasangan Kabel Instalasi ( NYM-3x2,5 mm2) 132.00 m1 18,260 2,410,320
L04 Pemasangan Kabel Instalasi ( NYM-3x1,5 mm2) 276.00 m1 11,730 3,237,480
L05 Pemasangan Fitting Lampu 16.00 Unit 35,770 572,320
L06 Pemasangan Saklar Lampu 8.00 unit 36,770 294,160
L07 Pemasangan Receiptackle (Colokan Listrik) 8.00 unit 42,190 337,520
L08 Pasang Lampu 5 Watt 5.00 unit 31,085 155,425
L09 Pasang Lampu 10 Watt 8.00 unit 46,085 368,680
L10 Pasang Lampu 20 Watt 3.00 unit 52,085 156,255

Sub-total Pekerjaan L 9,355,260

M PEKERJAAN KERAMIK LANTAI DAN DINDING


M01 Pekerjaan Cor Lantai Kerja Non Struktur (K100- 1:4:4 9.43 unit 52,085 491,162
M02 Memasang Keramik Lantai Utama (Ex Granito 60x60 158.00 m2 292,875 46,274,250
M03 Memasang Keramik Lantai Teras (Ex Platinum 40x40 18.00 m2 192,070 3,457,260
M04 Memasang Keramik Lantai WC (Ex Asia Tile 20x20) 12.60 m2 252,950 3,187,170

216/396
M05 Memasang Keramik Dinding WC (Ex Roman 20x40) 22.00 m2 278,255 6,121,610
M06 Memasang Plint Keramik Dinding (Ex Granito 10x60) 110.00 m1 43,072 4,737,920
M07 Memasang Rope Tile (Kuku Tegel/Plint Sudut) 164.00 m1 32,935 5,401,340

Sub-total Pekerjaan M 69,670,712

N PEKERJAAN LANGIT-LANGIT (PLAFON)


N01 Memasang Rangka Plafon Hollow Galvanish 126.00 m2 132,580 16,705,080
N02 Memasang Pelapis Plafon ( Ex Gipsum Board 9mm) 126.00 m2 46,926 5,912,613
N03 Memasang List Plafon 46.00 m1 13,819 635,651

Sub-total Pekerjaan N 23,253,344

O PEKERJAAN PENGECATAN DAN WATERPROFING


O01 Pekerjaan Plamir Dinding 134.00 m2 15,000 2,010,000
O02 Pekerjaan Cat Anti Lumut dan Waterprofing 176.00 m2 19,050 3,352,800
O03 Pekerjaan Pengecatan Exterior ( Ex Mowilex) 256.00 m2 20,869 5,342,354
O04 Pekerjaan Pengecatan Interior ( Ex Nippon Paint) 134.00 m2 18,519 2,481,552
O05 Pekerjaan Pengecatan Plafon( Ex Mowilex) 258.00 m2 19,150 4,940,700
O06 Pekerjaan Pengecatan Kayu ( Ex Avian) 22.00 m2 42,685 939,070
O07 Pekerjaan Pengecatan Besi ( Ex Avian) 16.00 m2 30,133 482,120

Sub-total Pekerjaan O 19,548,597

P PEKERJAAN TANGGA
P01 Pekerjaan Pembesian Tangga 162.72 kg 12,327 2,005,800
P02 Pekerjaan Bekisting Tangga 14.13 m2 343,768 4,856,325
P03 Pekerjaan Cor Beton Tangga (K-225) 3.20 m3 975,620 3,118,207
P04 Pekerjaan Plasteran ( 1,5 cm- 1: 5) 13.93 m2 58,894 820,358
P05 Pekerjaan Keramik Tangga ( Ex Asia Tile 40x40) 12.35 m2 192,070 2,372,065
P06 Pekerjaan Rope Tile 25.00 m1 32,935 823,375
P07 Pekerjaan Plamir 13.93 m2 15,000 208,940
P08 Pekerjaan Pengecatan Tangga 13.93 m2 18,519 257,958
P09 Pekerjaan Railing Tangga 9.00 m1 643,933 5,795,400

Sub-total Pekerjaan P 20,258,429

Q PEKERJAAN PAGAR DAN TAMAN/HALAMAN


Pekerjaan Pagar
Pekerjaan Struktur (Pondasi, Sloof, dan Kolom)
Q01 Pekerjaan Galian Pondasi 1.44 m3 68,375 98,460
Q02 Pasangan Batu Pondasi 1.05 m3 843,145 885,302
Q03 Pekerjaan Pembesian Sloof 20.96 kg 12,327 258,334
Q04 Pekerjaan Bekisting Sloof 0.90 m2 194,485 175,037
Q05 Pekerjaan Pengecoran (K200) 0.14 m3 954,206 128,818
Q06 Pekerjaan Pembesian Kolom 19.24 kg 12,327 237,106
Q07 Pekerjaan Bekisting Kolom 1.30 m2 369,055 480,826
Q08 Pekerjaan Pengecoran (K200) 0.12 m3 954,206 116,549
Q09 Pekerjaan Pembesian Balok 20.96 kg 12,327 258,334
Q10 Pekerjaan Bekisting Balok 1.35 m2 378,355 510,779
Q11 Pekerjaan Pengecoran (K200) 0.14 m3 954,206 128,818
Pekerjaan Pasangan Pagar
Q12 Pasangan Batu Bata 16.82 m2 109,334 1,839,193
Q13 Pekerjaan Plasteran 24.00 m2 58,894 1,413,461
Q14 Pekerjaan Acian 2.50 m2 34,575 86,438
Pekerjaan Finishing Pagar
Q15 Pekerjaan Pasangan Batu Alam 2.50 m2 333,925 834,813
Q16 Pekerjaan Pengecatan 24.00 m2 20,869 500,846
Pekerjaan Taman
Q17 Pekerjaan Pemasangan Paving Blok 10.00 m2 220,313 2,203,125

217/396
Q18 Pekerjaan Penanaman Pohon Perdu 5.00 pohon 560,350 2,801,750

Sub-total Pekerjaan Q 12,957,988

R PEKERJAAN TAMBAHAN DAN LAINNYA


R01 Pekerjaan Pemasangan Meteran Listrik (PLN-2200 kWh 1.00 Ls 2,500,000 2,500,000
R02 Pekerjaan Pemasangan Meteran Air (PDAM) 1.00 Ls 2,300,000 2,300,000
R03 Pekerjaan Pemasangan Pompa Air 1.00 unit 957,700 957,700
R04 Pemasangan Exhaust Fan 2.00 unit 312,190 624,380
R05 Pemasangan AC (Air Conditioner-1 PK, Ex. Sharp) 1.00 unit 4,812,190 4,812,190
R06 Pembersihan Area Kerja (Pasca Konstruksi) 150.00 m2 26,100 3,915,000

Sub-total Pekerjaan R 15,109,270

218/396
LAMPIRAN PERHITUNGAN VOLUME PEKERJAAN
A002/T100.80/I-2020-Pembangunan Rumah Tinggal 2 Lantai Type 200
Jl. Ebony Raya No. 77, Komp. Villa Danau Matano, Kab. Luwu Timur

RAB : 722,863,124
A. PEKERJAAN PENDAHULUAN

P panjang, m1 15.00 L lebar, m1 10.00 Luas Lahan,m2 150.00


Bowplank,m1 52.00
Gudang Bahan,m2 11.00
s1 Luas Gudang,m2 5.00 n1 Jumlah Gudang Bahan,unit 1.00 Jumlah Gudang Bahan,unit 1.00
s2 Luas Direksi Ket,m2 6.00 n2 Jumlah Direksi Keet,unit 1.00 Jumlah Direksi Keet,unit 1.00

B. PEKERJAANPONDASI

B1. Pondasi Setempat (Foot Plate)


Dimensi Utama
a1 Lebar 1 Kolom, m1 0.30 h2 Tinggi tapak,m1 0.30 Pekerjaan Galian,m3 12.30
a2 Lebar 2 Kolom, m1 0.30 h4 Tinggi urugan pasir,m1 0.05 Urugan Pasir,m3 0.50
b1 Lebar 1 Tapak , m1 1.00 N Jumlah Tapak 10 Pembesian,kg 442.05
b2 Lebar 1 Tapak , m1 1.00 Bekisting,m2 25.20
h1 Tinggi Kaki Kolom, m1 1.10 Cor Beton,m3 3.99

Pembesian Kaki Kolom


d1 Ø besi utama, mm 12.00 n1 Jumlah besi utama,bh 6.00 sisa galian,m3 8.31
d2 Ø besi support, mm 10.00 n2 Jumlah besi support,bh 2.00
d3 Ø besi ring, mm 8.00 r1 jarak ring, m1 0.20
Kb Ø kawat beton, mm 0.80 x panjang kawat ikat, m1 0.35

Pembesian Tapak
d4 Ø besi alas (merah), mm 12.00 r2 jarak antar tulangan,m1 0.15
d5 Ø besi pembentuk (hijau), mm 8.00 x panjang kawat ikat, m1 0.35
d6 Ø besi kait (kuning), mm 10.00
Kb Ø kawat beton, mm 0.80

B1. Pondasi Batu Kali


a lebar atas, m1 0.25 bk tggi batu kosong, m1 0.15 Galian,m3 46.89
b lebar bawah, m1 0.80 p pjg pondasi, m1 64.32 Urugan pasir,m3 2.89
t tinggi pondasi, m1 0.70 Anstamping,m3 8.68
ur urugan pasir, m1 0.05 Pasangan batu,m3 30.39

sisa galian,m3 4.92

B2. Pondasi Rollag


x lebar rollag, m1 0.20 p panjang pondasi, m1 8.50 Galian,m3 0.34
y tinggi rollag, m1 0.40 Urugan pasir,m3 0.09
Pasangan rollag,m3 0.68

sisa galian,m3 0.07

C. PEKERJAAN SLOOF

C1. Sloof Utama


x lebar, m1 0.20 r jarak antar sengkang, m1 0.15 Pembesian, m1 64.00
y tinggi, m1 0.30 K mutu beton, K K-250 Pembesian,kg 642.64
t panjang total , m1 64.00 Bekisting,m2 38.40
d1 Ø tulang utama, mm 12.00 Cor Beton,m3 3.84
d2 Ø tulang support, mm 10.00
d3 Ø tulang sengkang, mm 8.00
d4 Ø kawat beton, mm 0.80
n1 Jumlah Tulang Utama, bh 6.00
n2 Jumlah Tulang Support, bh 2.00 SL K-250-20x30-6xØ12+2xØ10 ,Ø8-15cm

C2. Sloof Praktis


x lebar, m1 0.15 r jarak antar sengkang, m1 0.20 Pembesian, m1 16.00
y tinggi, m1 0.20 K mutu beton, K K-250 Pembesian,kg 68.28

Software RAB Exarch xPro 219/396


t panjang total , m1 16.00 Bekisting,m2 6.40
d1 Ø tulang utama, mm 10.00 Cor Beton,m3 0.48
d2 Ø tulang support, mm 0.00
d3 Ø tulang sengkang, mm 6.00
d4 Ø kawat beton, mm 0.80
n1 Jumlah Tulang Utama, bh 4.00
n2 Jumlah Tulang Support, bh 0.00 SL K-250-15x20-4xØ10+0xØ0 ,Ø6-20cm

D. PEKERJAAN TIMBUNAN DAN PENINGGIAN ELEVASI

a Luasan Timbunan , m2 95.00 Urugan Tanah,m3 38.00


h Tinggi Timbunan, m1 0.40 Pemadatan tanah,m3 4.56
% Factor Buckling, m1 12%

E. PEKERJAAN KOLOM

C1. Kolom Utama Lantai 1


x lebar 1, m1 0.30 r jarak antar sengkang, m1 0.15 Pembesian, m1 36.00
y lebar 2, m1 0.40 K mutu beton, K K-250 Pembesian,kg 489.64
t tinggi/panjang total , m1 36.00 Bekisting,m2 50.40
d1 Ø tulang utama, mm 12.00 Cor Beton,m3 4.32
d2 Ø tulang support, mm 10.00
d3 Ø tulang sengkang, mm 8.00
d4 Ø kawat beton, mm 0.80
n1 Jumlah Tulang Utama, bh 6.00
n2 Jumlah Tulang Support, bh 2.00 KO K-250-30x40-6xØ12+2xØ10 ,Ø8-15cm

C2. Kolom Praktis Lantai 1


x lebar 1, m1 0.15 r jarak antar sengkang, m1 0.20 Pembesian, m1 46.00
y lebar 2, m1 0.15 K mutu beton, K K-250 Pembesian,kg 190.11
t tinggi total , m1 46.00 Bekisting,m2 27.60
d1 Ø tulang utama, mm 10.00 Cor Beton,m3 1.04
d2 Ø tulang support, mm 0.00
d3 Ø tulang sengkang, mm 6.00
d4 Ø kawat beton, mm 0.80
n1 Jumlah Tulang Utama, bh 4.00
n2 Jumlah Tulang Support, bh 0.00 KO K-250-15x15-4xØ10+0xØ0 ,Ø6-20cm

C3. Kolom Utama Lantai 2


x lebar 1, m1 0.30 r jarak antar sengkang, m1 0.15 Pembesian, m1 38.00
y lebar 2, m1 0.30 K mutu beton, K K-250 Pembesian,kg 494.72
t tinggi total , m1 38.00 Bekisting,m2 45.60
d1 Ø tulang utama, mm 12.00 Cor Beton,m3 3.42
d2 Ø tulang support, mm 10.00
d3 Ø tulang sengkang, mm 8.00
d4 Ø kawat beton, mm 0.80
n1 Jumlah Tulang Utama, bh 6.00
n2 Jumlah Tulang Support, bh 2.00 KO K-250-30x30-6xØ12+2xØ10 ,Ø8-15cm

C4. Kolom Praktis Lantai 2


x lebar 1, m1 0.15 r jarak antar sengkang, m1 0.20 Pembesian, m1 32.00
y lebar 2, m1 0.15 K mutu beton, K K-250 Pembesian,kg 132.33
t tinggi total , m1 32.00 Bekisting,m2 19.20
d1 Ø tulang utama, mm 10.00 Cor Beton,m3 0.72
d2 Ø tulang support, mm 0.00
d3 Ø tulang sengkang, mm 6.00
d4 Ø kawat beton, mm 0.80
n1 Jumlah Tulang Utama, bh 4.00
n2 Jumlah Tulang Support, bh 0.00 KO K-250-15x15-4xØ10+0xØ0 ,Ø6-20cm

F. PEKERJAAN BALOK (RING BALOK)

E1.E1. Ring Balok Utama


x lebar, m1 0.20 r jarak antar sengkang, m1 0.15 Pembesian, m1 64.00
y tinggi, m1 0.35 K mutu beton, K K-250 Pembesian,kg 814.06
t panjang total , m1 64.00 Bekisting,m2 44.80
d1 Ø tulang utama, mm 12.00 Cor Beton,m3 4.48
d2 Ø tulang support, mm 10.00
d3 Ø tulang sengkang, mm 8.00
d4 Ø kawat beton, mm 0.80
n1 Jumlah Tulang Utama, bh 6.00
n2 Jumlah Tulang Support, bh 2.00 RB K-250-20x35-6xØ12+2xØ10 ,Ø8-15cm

Software RAB Exarch xPro 220/396


E2. Ring Balok Praktis
x lebar, m1 0.15 r jarak antar sengkang, m1 0.20 Pembesian, m1 32.00
y tinggi, m1 0.20 K mutu beton, K K-250 Pembesian,kg 136.26
t panjang total , m1 32.00 Bekisting,m2 12.80
d1 Ø tulang utama, mm 10.00 Cor Beton,m3 0.96
d2 Ø tulang support, mm 0.00
d3 Ø tulang sengkang, mm 6.00
d4 Ø kawat beton, mm 0.80
n1 Jumlah Tulang Utama, bh 4.00
n2 Jumlah Tulang Support, bh 0.00 RB K-250-15x20-4xØ10+0xØ0 ,Ø6-20cm

E1.E1. Ring Balok Utama


x lebar, m1 0.25 r jarak antar sengkang, m1 0.20 Pembesian, m1 43.00
y tinggi, m1 0.40 K mutu beton, K K-250 Pembesian,kg 506.89
t panjang total , m1 43.00 Bekisting,m2 34.40
d1 Ø tulang utama, mm 12.00 Cor Beton,m3 4.30
d2 Ø tulang support, mm 10.00
d3 Ø tulang sengkang, mm 8.00
d4 Ø kawat beton, mm 0.80
n1 Jumlah Tulang Utama, bh 6.00
n2 Jumlah Tulang Support, bh 2.00 RB K-250-25x40-6xØ12+2xØ10 ,Ø8-20cm

E2. Ring Balok Praktis


x lebar, m1 0.15 r jarak antar sengkang, m1 0.20 Pembesian, m1 25.00
y tinggi, m1 0.20 K mutu beton, K K-250 Pembesian,kg 106.52
t panjang total , m1 25.00 Bekisting,m2 10.00
d1 Ø tulang utama, mm 10.00 Cor Beton,m3 0.75
d2 Ø tulang support, mm 0.00
d3 Ø tulang sengkang, mm 6.00
d4 Ø kawat beton, mm 0.80
n1 Jumlah Tulang Utama, bh 4.00
n2 Jumlah Tulang Support, bh 0.00 RB K-250-15x20-4xØ10+0xØ0 ,Ø6-20cm

G. PEKERJAAN DAK DAN PELAT BETON

F1. Dak Beton


x Lebar x , m1 10.00 K mutu beton, K K-250 Luasan Pembesian, m2 90.00
y Lebar y , m1 9.00 Pembesian,kg 1989.29
t tebal dak , m1 0.13 Bekisting,m2 90.00
D Ø tulangan , mm 12.00 Cor Beton,m3 11.70
k Jarak tulangan, m1 0.18
n Jumlah Layer/Susunan, lapis 2 A' Luas Dak Beton ,m1 90.00

F1. Pelat Beton, Topi Beton


x Lebar x , m1 2.00 Luasan Pembesian, m2 6.00
y Lebar y , m1 3.00 K mutu beton, K K-250 Pembesian,kg 48.07
t tebal dak , m1 0.10 Bekisting,m2 6.00
D Ø tulangan , mm 10.00 Cor Beton,m3 0.60
k Jarak tulangan, m1 0.20
n Jumlah Layer/Susunan, lapis 1 A' Luas Dak Beton ,m1 6.00

H. PEKERJAAN DINDING

E1. Dinding 1
Luasan Area Luar (Exterior)
Tampak Depan Tampak Belakang Pasangan,m2 146.24
F1 (+) Luasan Dinding, m2 43.00 B1 (+) Luasan Dinding, m2 37.00 Trassram,m2 14.62
F2 (-) Luasan Pengurang, m2 12.00 B2 (-) Luasan Pengurang, m2 9.76 Plasteran,m2 292.48
Total A 31.00 Total B 27.24 Acian,m2 292.48
Tampak Kanan Tampak Kiri
R1 (+) Luasan Dinding, m2 70.00 L1 (+) Luasan Dinding, m2 68.00
R2 (-) Luasan Pengurang, m2 26.00 L2 (-) Luasan Pengurang, m2 24.00
Total A 44.00 Total B 44.00

E1. Dinding 2
Luasan Area Luar (Exterior)
Tampak Depan Tampak Belakang Pasangan,m2 134.00
F1 (+) Luasan Dinding, m2 46.00 B1 (+) Luasan Dinding, m2 38.00 Trassram,m2 13.40
F2 (-) Luasan Pengurang, m2 14.00 B2 (-) Luasan Pengurang, m2 16.00 Plasteran,m2 268.00
Total A 32.00 Total B 22.00 Acian,m2 268.00

Software RAB Exarch xPro 221/396


Tampak Kanan Tampak Kiri
R1 (+) Luasan Dinding, m2 54.00 L1 (+) Luasan Dinding, m2 62.00
R2 (-) Luasan Pengurang, m2 19.00 L2 (-) Luasan Pengurang, m2 17.00
Total A 35.00 Total B 45.00

I. PEKERJAAN ATAP

P Panjang Bentangan, m1 15.00 L Sudut Atap, derajat 21.8 Pek.Rangka Atap,m2 161.55
L Lebar Bentangan, m1 10.00 Pek. Pelapis Atap,m2 161.55
t Tinggi atap, m1 2.00 Pekerjaan Nok Atap,m1 26.91
ty Model Atap, Type limas Pekerjaan Listplank,m1 50.00
Pekerjaan Talang Air,m1 50.00

J. PEKERJAAN PINTU DAN JENDELA

p1 Pintu Utama 2 Pintu Utama, unit 2.00


p2 Pintu Kamar 7 Pintu Kamar, unit 7.00
p3 Pintu WC 3 Pintu WC, unit 3.00
j1 Jendela Type 1 4 Jendela Type 1, unit 4.00
j2 Jendela Type 2 3 Jendela Type 2, unit 3.00
bv1 Lubang angin (loster) 28 Lubang Angin, unit 28.00

K. PEKERJAAN MEKANIKAL & PLUMBING


Plumbing
k jumlah kran, titik 6 Instalasi Pipa 3/4-Air Bersih,m1 66.00
d kloset duduk, titik 1 Instalasi Pipa 1/2-Air Bersih,m1 35.00
j kloset jongkok, titik 2 Keran Air,bh 6.00
ws wastafel Cuci, titik 1 Shower Mandi,bh 4.00
sh Shower Mandi, unit 4 Tangki Air,bh 1.00
tk Tangki Air, unit 1 Instalasi Pipa 3"-Air Limbah,m1 66.00
Inst. Pipa 4"-Sanitasi/Kloset,m1 36.00
Wastafel Cuci,bh 1.00
Jumlah Kloset Duduk,bh 1.00
Jumlah Kloset Jongkok,bh 2.00
Jumlah Floor Drain,bh 3.00
Jumlah Septik Tank,Unit 1.00
Jumlah Sumur Resapan,unit 1.00

L. PEKERJAAN ELECTRIKAL

L lebar rumah, m1 7.00 l1 Lampu 5 Watt, bh 5.00 MCB Pengaman, unit 2.00
P panjang rumah , m1 15.00 l2 Lampu 10 Watt, bh 8.00 Grounding, unit 1.00
t jumlah tingkat , tingkat 2 l3 Lampu 20 Watt, bh 3 Kabel Utama (3x2.5 NYM),m1 132.00
z jumlah ruang , ruang 5 Kabel Instalasi (2x2.5 NYM),m1 276.00
nL Jumlah titik lampu , titik 16 Jumlah Fitting Lampu,bh 16.00
nC Jumlah titik colokan , titik 8 Jumlah Saklar ,bh 8.00
Jumlah Receiptackle,bh 8.00
Lampu 5 Watt ,bh 5.00
Lampu 10 Watt ,bh 8.00
Lampu 20 Watt ,bh 3.00

M. PEKERJAAN KERAMIK

T Tebal Cor lantai Kerja, m1 0.05 K mutu beton, K K-250 Vol. Cor lantai kerja,m3 9.43
Luasan Keramik Lantai (m2) Luasan Keramik Dinding (m2) Keramik Lantai Utama,m2 158.00
f1 Keramik Utama,m2 158.00 w1 Keramik Dinding 1,m2 10.00 Keramik lantai Teras,m2 18.00
f2 Keramik WC/Toilet,m2 12.60 w2 Keramik Dinding 2,m2 8.00 Keramik Lantai WC,m2 12.60
f3 Keramik Teras,m2 18.00 w3 Keramik Dinding 3,m2 4.00 Keramik Dinding,m2 22.00
188.60 22.00 Pasangan Plint,m1 110.00
Panjang Pasangan Plint (m1) Panjang pasangan rope tile (m1) Pas. Rope Tile,m1 164.00
p1 Panjang Plint 1 87.00 r1 Panjang Rope Tile 1 132.00
p2 Panjang Plint 2 23.00 r2 Panjang Rope Tile 2 32.00
110.00 164.00

N. PEKERJAAN PLAFON

P Panjang Ruang, m1 9.00 L Lebar Ruang, m1 14.00 Pekerjaan Rangka Plafon 126.00
Pekerjaan Pelapis Plafon 126.00
A Luas Plafon, m2 126.00 Pekerjaan List Plafon 46.00

Software RAB Exarch xPro 222/396


O. PEKERJAANPENGECATAN DAN LABURAN

Pekerjaan Cat Interior Pekerjaan Cat Exterior Pekerjaan Plamir,m2 134.00


Ct1 Luasan Cat 1 122.00 Ct1 Luasan Cat 1 244.00 Cat Waterprofing,m2 176.00
Ct2 Luasan Cat 2 12.00 Ct2 Luasan Cat 2 12.00 Cat Exterior (Luar),m2 256.00
134.00 256.00 Cat Interior (Dalam),m2 134.00
Pekerjaan Cat Plafon Pekerjaan Cat Waterprofing Pengecatan Plafon,m2 258.00
Ct1 Luasan Cat 1 234.00 Ct1 Luasan Cat 1 123.00 Pengecatan Kayu,m2 22.00
Ct2 Luasan Cat 2 24.00 Ct2 Luasan Cat 2 53.00 Pengecatan Besi,m2 16.00
258.00 176.00
Pekerjaan Cat Kayu Pekerjaan Cat Besi
Ct1 Luasan Cat 1 22.00 Ct1 Luasan Cat 1 16.00

P. PEKERJAAN TANGGA

L Lebar Tangga, m1 1.0 r1 jarak antar tulangan, m1 0.15 Total Pjg besi Ød1,m1 41.65
L1 Horizontal Tangga 1, m1 2.5 r2 jarak antar ring, m1 0.15 Total Pjg besi Ød2,m1 44.51
L2 Horizontal Tangga 2, m1 2.5 Total Pjg besi Ød3,m1 41.65
L3 Lebar Rest/bordess, m1 1.0 R Panjang Rail Tangga, m1 9.00 Total Pjg besi Ød4,m1 149.90
t1 Tinggi Pondasi, m1 0.5 Total Pjg besi Ød5,m1 102.80
t2 Tinggi Tangga 1, m1 2.0 Jumlah kawat beton,kg 11.12
t3 Tinggi Tangga 2, m1 2.5 Hasil Total Besi , kg 162.72
m Tinggi anak tangga, m1 0.2 Panjang Tangga 1,m1 3.2 Total Bekisting,m2 14.13
n Lebar anak tangga, m1 0.3 Panjang Tangga 2,m1 3.5 Cor Beton,m3 3.20
d1 Ø tulang susut/bagi , mm 12.0 Sudut tangga 1,derajat 38.7 Plasteran,m2 13.93
d2 Ø tulang utama 1, mm 10.0 Sudut tangga 2, derajat 45.0 Keramik,m2 12.35
d3 Ø tulang tumpuan, mm 8.0 Luas Bentang, m2 8.7 Rope Tile,m1 25.00
d4 Ø tulang ring, mm 8.0 Jumlah Anak tangga 1,bh 10.0 Plamir atau Cat,m2 13.93
d5 Ø tulang anak tangga, mm 6.0 Jumlah Anak tangga 2,bh 13.0 Railing Tangga,m1 9.00

Q. PEKERJAAN PAGAR DAN HALAMAN/TAMAN

a Panjang Pagar,m1 6.00 Struktur Balok (Ring Balok) Galian Pondasi,m3 1.44
b Tinggi Pagar, m1 2.00 m Lebar 1 Balok,m1 0.15 Pas. Batu Pondasi,m3 1.05
h Jarak Antar Kolom,m1 3.50 n Lebar 2 Balok ,m1 0.15 Pembesian Sloof, kg 20.96
Bekisting Sloof,m2 0.90
d1 Ø tulang utama , mm 10 Finishing dan lainnya Cor Sloof,m3 0.14
n Jumlah tulang utama, bh 4 ba Pasangan Batu Alam,m2 2.50 Pembesian Kolom, kg 19.24
d2 Ø tulang ring , mm 6 pb Paving Block,m2 10.00 Bekisting Kolom ,m2 1.30
r jarak antar ring, m1 0.20 po Tanaman Pohon/Bunga,unit 5 Cor Kolom,m3 0.12
Struktur Pondasi Pembesian Balok, kg 20.96
a Lebar Atas Pondasi,m1 0.20 Result Bekisting Balok ,m2 1.35
b Lebar Bawah Pondasi,m1 0.50 d1 Tulang Utama Sloof,m1 26.4 Cor Balok,m3 0.14
h Tinggi Pondasi,m1 0.50 d2 Tulang Ring Sloof,m1 21.1 Pas. Bata/Batako,m2 16.82
Struktur Sloof d1 Tulang Utama Kolom,m1 23.9 Plasteran,m2 24.00
c Ukuran lebar sloof, m1 0.15 d2 Tulang Ring Kolom,m1 20.4 Pas. Batu Alam,m2 2.50
d Ukuran tinggi sloof,m1 0.15 d1 Tulang Utama Balok,m1 26.4 Acian,m2 24.00
Struktur Kolom d2 Tulang Ring Balok,m1 21.1 Pengecatan,m2 24.00
e Lebar 1 Kolom,m1 0.15 Paving Block,m2 10.00
f Lebar 2 Kolom,m1 0.15 Pohon/Bunga,unit 5.00

R. PAKET SATUAN PEKERJAAN

ml Meteran Listrik (PLN) 1 ac Air Condironer (AC) 1 Instalasi Listrik PLN, unit 1.00
ma Meteran Air (PDAM) 1 wh Water Heater 1 Instalasi Air PDAM, unit 1.00
po Instalasi Pompa 1 Instalasi Pompa Air, Unit 1.00
ef Exhaust Fan+blower 2 Instalasi Exhaust Fan, unit 2.00
ta Instalasi Anti Petir 1 Instalasi AC, Unit 1.00
Instalasi Water Heater, unit 1.00
Instalasi Anti Petir 1.00

Software RAB Exarch xPro 223/396


REKAPITULASI RENCANA ANGGARAN BIAYA

.ID : A002/T100.80/I-2020
Nama Project : : Pembangunan Rumah Tinggal 2 Lantai Type 200
Lokasi :: Jl. Ebony Raya No. 77, Komp. Villa Danau Matano, Kab. Luwu Timur
Tahun : : 2020

NO NAMA PEKERJAAN BIAYA


A PEKERJAAN PERSIAPAN 23,589,393
B PEKERJAAN PONDASI 52,089,748
C PEKERJAAN SLOOF 21,690,815
D PEKERJAAN TIMBUNAN 8,571,280
E PEKERJAAN KOLOM 78,072,740
F PEKERJAAN RINGBALOK (BALOK) 68,101,874
G PEKERJAAN COR PLATE BETON (DAK BETON) 82,142,902
H PEKERJAAN DINDING 86,226,485
I PEKERJAAN ATAP 78,377,470
J PEKERJAAN PINTU, JENDELA DAN ACCESORIS 29,596,950
K PEKERJAAN INST. PIPA AIR BERSIH &SANITASI 24,249,869
L PEKERJAAN INST. LISTRIK DAN PENERANGAN 9,355,260
M PEKERJAAN KERAMIK LANTAI DAN DINDING 69,670,712
N PEKERJAAN LANGIT-LANGIT (PLAFON) 23,253,344
O PEKERJAAN PENGECATAN DAN WATERPROFING 19,548,597
P PEKERJAAN TANGGA 20,258,429
Q PEKERJAAN PAGAR DAN TAMAN/HALAMAN 12,957,988
R PEKERJAAN TAMBAHAN DAN LAINNYA 15,109,270
Nilai RAB 722,863,124
PPn (10 %) 72,286,312
TOTAL 795,149,436
Dibulatkan 795,150,000
Terbilang :
Tujuh Ratus Sembilan Puluh Lima Juta Seratus Lima Puluh Ribu Rupiah

224/396
Stan
Nama dar Nama Kode Kebutuh Eleme Harga
No ID V Unit ID AHS Nama AHSP No ID AHS Koef Unit Harga Dasar HD AHSP Total Start Finish Harian Kat.1 Kat.2 Kat.3 org D N'
Pekerjaan Kod Item Item an n AHSP
e
2 1 A01 [ 150 m2 / 4 har 150 m2 U-001 [ m2 ] Pembers 1 U-001.1 A.2.2. 0.10 OH Pekerja ( O L.1 15.00 85,000 8,500 1,275,000 Biaya 17,750 7-Apr-20 10-Apr-20 318,750 LT1 PPS A 3 4.0 5
1 A01 [ 150 m2 / 4 har 150 m2 U-001 [ m2 ] Pembers 2 U-001.2 A.2.2. 0.05 OH Mandor ( O L.10 7.50 185,000 9,250 1,387,500 Biaya 7-Apr-20 10-Apr-20 346,875 LT1 PPS A 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

7 2 A02 [ 52 m1 / 2 hari 52 m1 U-002 [ m1 ] Penguk 1 U-002.1 A.2.2. 0.10 OH Pekerja ( O L.1 5.20 85,000 8,500 442,000 Biaya 90,125 10-Apr-20 11-Apr-20 221,000 LT1 PPS A 3 2.0 5
2 A02 [ 52 m1 / 2 hari 52 m1 U-002 [ m1 ] Penguk 2 U-002.2 A.2.2. 0.10 OH Tukang Kay L.6 5.20 100,000 10,000 520,000 Biaya 10-Apr-20 11-Apr-20 260,000 LT1 PPS A 1 2
2 A02 [ 52 m1 / 2 hari 52 m1 U-002 [ m1 ] Penguk 3 U-002.3 A.2.2. 0.01 OH Kepala Tuk L.9 0.52 150,000 1,500 78,000 Biaya 10-Apr-20 11-Apr-20 39,000 LT1 PPS A 1 2
2 A02 [ 52 m1 / 2 hari 52 m1 U-002 [ m1 ] Penguk 4 U-002.4 A.2.2. 0.01 OH Mandor ( O L.10 0.26 185,000 925 48,100 Biaya 10-Apr-20 11-Apr-20 24,050 LT1 PPS A 1 1
2 A02 [ 52 m1 / 2 hari 52 m1 U-002 [ m1 ] Penguk 5 U-002.5 A.2.2. 0.01 m3 Balok Kayu M.98 0.62 3,100,000 37,200 1,934,400 Biaya 10-Apr-20 11-Apr-20 967,200 LT1 PPS A - -
2 A02 [ 52 m1 / 2 hari 52 m1 U-002 [ m1 ] Penguk 6 U-002.6 A.2.2. 0.02 Kg Paku Biasa M.111 1.04 25,000 500 26,000
Biaya Bahan 10-Apr-20 11-Apr-20 13,000 LT1 PPS A - -
2 A02 [ 52 m1 / 2 hari 52 m1 U-002 [ m1 ] Penguk 7 U-002.7 A.2.2. 0.01 m3 Papan KayuM.106 0.36 4,500,000 31,500 1,638,000
Biaya Bahan 10-Apr-20 11-Apr-20 819,000 LT1 PPS A - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

### 3 A03 [ 1 Unit / 1 har 1 Unit U-003 [ Unit ] Pemb 1 U-003.1 A.2.2. 1.00 OH Mandor ( O L.10 1.00 185,000 185,000 185,000 Biaya 11-Apr-20 11-Apr-20 185,000 LT1 PPS A 1 1.0 1
3 A03 [ 1 Unit / 1 har 1 Unit U-003 [ Unit ] Pemb 2 U-003.2 A.2.2. 5.00 OH Pekerja ( O L.1 5.00 85,000 425,000 425,000 Biaya 8,092,696 11-Apr-20 11-Apr-20 425,000 LT1 PPS A 3 5
3 A03 [ 1 Unit / 1 har 1 Unit U-003 [ Unit ] Pemb 3 U-003.3 A.2.2. 1.00 OH Kepala Tuk L.9 1.00 150,000 150,000 150,000 Biaya 11-Apr-20 11-Apr-20 150,000 LT1 PPS A 1 2
3 A03 [ 1 Unit / 1 har 1 Unit U-003 [ Unit ] Pemb 4 U-003.4 A.2.2. 2.00 OH Tukang Kay L.6 2.00 100,000 200,000 200,000 Biaya 11-Apr-20 11-Apr-20 200,000 LT1 PPS A 1 2
3 A03 [ 1 Unit / 1 har 1 Unit U-003 [ Unit ] Pemb 5 U-003.5 A.2.2. 0.32 m3 Balok KayuM.100 0.32 3,500,000 1,108,800 1,108,800 Biaya 11-Apr-20 11-Apr-20 1,108,800 LT1 PPS A - -
3 A03 [ 1 Unit / 1 har 1 Unit U-003 [ Unit ] Pemb 6 U-003.6 A.2.2. 0.04 m3 Balok Kayu M.98 0.04 3,100,000 109,048 109,048
Biaya Bahan 11-Apr-20 11-Apr-20 109,048 LT1 PPS A - -
3 A03 [ 1 Unit / 1 har 1 Unit U-003 [ Unit ] Pemb 7 U-003.7 A.2.2. 0.10 m3 Balok Kayu M.96 0.10 2,800,000 266,112 266,112
Biaya Bahan 11-Apr-20 11-Apr-20 266,112 LT1 PPS A - -
3 A03 [ 1 Unit / 1 har 1 Unit U-003 [ Unit ] Pemb 8 U-003.8 A.2.2. 0.03 m3 Balok Kayu M.94 0.03 2,200,000 69,724 69,724
Biaya Bahan 11-Apr-20 11-Apr-20 69,724 LT1 PPS A - -
3 A03 [ 1 Unit / 1 har 1 Unit U-003 [ Unit ] Pemb 9 U-003.9 A.2.2. 0.20 m3 Papan KayuM.106 0.20 4,500,000 891,000 891,000
Biaya Bahan 11-Apr-20 11-Apr-20 891,000 LT1 PPS A - -
3 A03 [ 1 Unit / 1 har 1 Unit U-003 [ Unit ] Pemb 10 U-003.10 A.2.2. 31.68 Lbr Tripleks ( L M.62 31.68 85,000 2,692,800 2,692,800
Biaya Bahan 11-Apr-20 11-Apr-20 2,692,800 LT1 PPS A - -
3 A03 [ 1 Unit / 1 har 1 Unit U-003 [ Unit ] Pemb 11 U-003.11 A.2.2. 19.72 Lbr Seng GelombM.61 19.72 70,000 1,380,192 1,380,192
Biaya Bahan 11-Apr-20 11-Apr-20 1,380,192 LT1 PPS A - -
3 A03 [ 1 Unit / 1 har 1 Unit U-003 [ Unit ] Pemb 12 U-003.12 A.2.2. 69.99 bh Screw ( bh M.113 69.99 500 34,993 34,993
Biaya Bahan 11-Apr-20 11-Apr-20 34,993 LT1 PPS A - -
3 A03 [ 1 Unit / 1 har 1 Unit U-003 [ Unit ] Pemb 13 U-003.13 A.2.2. 1.94 kg Paku Biasa M.110 1.94 23,500 45,703 45,703
Biaya Bahan 11-Apr-20 11-Apr-20 45,703 LT1 PPS A - -
3 A03 [ 1 Unit / 1 har 1 Unit U-003 [ Unit ] Pemb 14 U-003.14 A.2.2. 7.29 kg Paku Biasa 2M.111 7.29 25,000 182,325 182,325
Biaya Bahan 11-Apr-20 11-Apr-20 182,325 LT1 PPS A - -
3 A03 [ 1 Unit / 1 har 1 Unit U-003 [ Unit ] Pemb 15 U-003.15 A.2.2. 0.09 m3 Pasir Urug M.10 0.09 200,000 18,000 18,000
Biaya Bahan 11-Apr-20 11-Apr-20 18,000 LT1 PPS A - -
3 A03 [ 1 Unit / 1 har 1 Unit U-003 [ Unit ] Pemb 16 U-003.16 A.2.2. 0.15 m3 Kerikil ( m3 M.7 0.15 220,000 33,000 33,000
Biaya Bahan 11-Apr-20 11-Apr-20 33,000 LT1 PPS A - -
3 A03 [ 1 Unit / 1 har 1 Unit U-003 [ Unit ] Pemb 17 U-003.17 A.2.2. 3.00 bh Engsel PintuM.125 3.00 17,000 51,000 51,000
Biaya Bahan 11-Apr-20 11-Apr-20 51,000 LT1 PPS A - -
3 A03 [ 1 Unit / 1 har 1 Unit U-003 [ Unit ] Pemb 18 U-003.18 A.2.2. 1.00 Ls Perlengkap A.4 1.00 250,000 250,000 250,000Biaya Alat 11-Apr-20 11-Apr-20 250,000 LT1 PPS A - -
. . . - -

### 4 A04 [ 1 Unit / 1 hari 1 Unit U-004 [ Unit ] Pembu 1 U-004.1 A.2.2. 1.00 OH Mandor ( O L.10 1.00 185,000 185,000 185,000 Biaya 11-Apr-20 11-Apr-20 185,000 LT1 PPS A 1 1.0 1
4 A04 [ 1 Unit / 1 hari 1 Unit U-004 [ Unit ] Pembu 2 U-004.2 A.2.2. 5.00 OH Pekerja ( O L.1 5.00 85,000 425,000 425,000 Biaya 8,147,696 11-Apr-20 11-Apr-20 425,000 LT1 PPS A 3 5
4 A04 [ 1 Unit / 1 hari 1 Unit U-004 [ Unit ] Pembu 3 U-004.3 A.2.2. 1.00 OH Kepala Tuk L.9 1.00 150,000 150,000 150,000 Biaya 11-Apr-20 11-Apr-20 150,000 LT1 PPS A 1 2
4 A04 [ 1 Unit / 1 hari 1 Unit U-004 [ Unit ] Pembu 4 U-004.4 A.2.2. 2.00 OH Tukang Kay L.6 2.00 100,000 200,000 200,000 Biaya 11-Apr-20 11-Apr-20 200,000 LT1 PPS A 1 2
4 A04 [ 1 Unit / 1 hari 1 Unit U-004 [ Unit ] Pembu 5 U-004.5 A.2.2. 0.32 m3 Balok KayuM.100 0.32 3,500,000 1,108,800 1,108,800 Biaya 11-Apr-20 11-Apr-20 1,108,800 LT1 PPS A - -
4 A04 [ 1 Unit / 1 hari 1 Unit U-004 [ Unit ] Pembu 6 U-004.6 A.2.2. 0.04 m3 Balok Kayu M.98 0.04 3,100,000 109,048 109,048
Biaya Bahan 11-Apr-20 11-Apr-20 109,048 LT1 PPS A - -
4 A04 [ 1 Unit / 1 hari 1 Unit U-004 [ Unit ] Pembu 7 U-004.7 A.2.2. 0.10 m3 Balok Kayu M.96 0.10 2,800,000 266,112 266,112
Biaya Bahan 11-Apr-20 11-Apr-20 266,112 LT1 PPS A - -
4 A04 [ 1 Unit / 1 hari 1 Unit U-004 [ Unit ] Pembu 8 U-004.8 A.2.2. 0.03 m3 Balok Kayu M.94 0.03 2,200,000 69,724 69,724
Biaya Bahan 11-Apr-20 11-Apr-20 69,724 LT1 PPS A - -
4 A04 [ 1 Unit / 1 hari 1 Unit U-004 [ Unit ] Pembu 9 U-004.9 A.2.2. 0.20 m3 Papan KayuM.106 0.20 4,500,000 891,000 891,000
Biaya Bahan 11-Apr-20 11-Apr-20 891,000 LT1 PPS A - -
4 A04 [ 1 Unit / 1 hari 1 Unit U-004 [ Unit ] Pembu 10 U-004.10 A.2.2. 31.68 Lbr Tripleks ( L M.62 31.68 85,000 2,692,800 2,692,800
Biaya Bahan 11-Apr-20 11-Apr-20 2,692,800 LT1 PPS A - -
4 A04 [ 1 Unit / 1 hari 1 Unit U-004 [ Unit ] Pembu 11 U-004.11 A.2.2. 19.72 Lbr Seng GelombM.61 19.72 70,000 1,380,192 1,380,192
Biaya Bahan 11-Apr-20 11-Apr-20 1,380,192 LT1 PPS A - -
4 A04 [ 1 Unit / 1 hari 1 Unit U-004 [ Unit ] Pembu 12 U-004.12 A.2.2. 69.99 bh Screw ( bh M.113 69.99 500 34,993 34,993
Biaya Bahan 11-Apr-20 11-Apr-20 34,993 LT1 PPS A - -
4 A04 [ 1 Unit / 1 hari 1 Unit U-004 [ Unit ] Pembu 13 U-004.13 A.2.2. 1.94 kg Paku Biasa M.110 1.94 23,500 45,703 45,703
Biaya Bahan 11-Apr-20 11-Apr-20 45,703 LT1 PPS A - -
4 A04 [ 1 Unit / 1 hari 1 Unit U-004 [ Unit ] Pembu 14 U-004.14 A.2.2. 7.29 kg Paku Biasa 2M.111 7.29 25,000 182,325 182,325
Biaya Bahan 11-Apr-20 11-Apr-20 182,325 LT1 PPS A - -
4 A04 [ 1 Unit / 1 hari 1 Unit U-004 [ Unit ] Pembu 15 U-004.15 A.2.2. 0.09 m3 Pasir Urug M.10 0.09 200,000 18,000 18,000
Biaya Bahan 11-Apr-20 11-Apr-20 18,000 LT1 PPS A - -
4 A04 [ 1 Unit / 1 hari 1 Unit U-004 [ Unit ] Pembu 16 U-004.16 A.2.2. 0.15 m3 Kerikil ( m3 M.7 0.15 220,000 33,000 33,000
Biaya Bahan 11-Apr-20 11-Apr-20 33,000 LT1 PPS A - -
4 A04 [ 1 Unit / 1 hari 1 Unit U-004 [ Unit ] Pembu 17 U-004.17 A.2.2. 3.00 bh Engsel PintuM.125 3.00 17,000 51,000 51,000
Biaya Bahan 11-Apr-20 11-Apr-20 51,000 LT1 PPS A - -
4 A04 [ 1 Unit / 1 hari 1 Unit U-004 [ Unit ] Pembu 18 U-004.18 A.2.2. 1.00 m2 Jendela nakM.136 1.00 55,000 55,000 55,000
Biaya Bahan 11-Apr-20 11-Apr-20 55,000 LT1 PPS A - -
4 A04 [ 1 Unit / 1 hari 1 Unit U-004 [ Unit ] Pembu 19 U-004.19 A.2.2. 1.00 Ls Perlengkap A.4 1.00 250,000 250,000 250,000Biaya Alat 11-Apr-20 11-Apr-20 250,000 LT1 PPS A - -

2 5 B01 [ 12,3 m3 / 2 har 12.3 m3 U-007 [ m3 ] Penggal 1 U-007.1 A.2.3. 0.90 OH Pekerja ( O L.1 11.07 85,000 76,500 940,950 Biaya 84,825 11-Apr-20 12-Apr-20 470,475 LT1 STR B 3 2.0 5
5 B01 [ 12,3 m3 / 2 har 12.3 m3 U-007 [ m3 ] Penggal 2 U-007.2 A.2.3. 0.05 OH Mandor ( O L.10 0.55 185,000 8,325 102,398 Biaya 11-Apr-20 12-Apr-20 51,199 LT1 STR B 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

3 6 B02 [ 0,5 m3 / 1 hari 0.5 m3 U-008 [ m3 ] Penguru 1 U-008.1 A.2.3. 0.30 OH Pekerja ( O L.1 0.15 85,000 25,500 12,750 Biaya 267,350 12-Apr-20 12-Apr-20 12,750 LT1 STR B 3 1.0 5
6 B02 [ 0,5 m3 / 1 hari 0.5 m3 U-008 [ m3 ] Penguru 2 U-008.2 A.2.3. 0.01 OH Mandor ( O L.10 0.01 185,000 1,850 925 Biaya 12-Apr-20 12-Apr-20 925 LT1 STR B 1 1
6 B02 [ 0,5 m3 / 1 hari 0.5 m3 U-008 [ m3 ] Penguru 3 U-008.3 A.2.3. 1.20 M3 Pasir urug M.10 0.60 200,000 240,000 120,000 Biaya 12-Apr-20 12-Apr-20 120,000 LT1 STR B - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 7 B03 [ 442,1 kg / 1 h 442 kg U-033 [ kg ] Pembesia 1 U-033.1 A.4.1. 0.01 OH Pekerja ( O L.1 3.09 85,000 595 263,017 Biaya 12,327 12-Apr-20 12-Apr-20 263,017 LT1 STR B 3 1.0 5
7 B03 [ 442,1 kg / 1 h 442 kg U-033 [ kg ] Pembesia 2 U-033.2 A.4.1. 0.01 OH Tukang Bes L.4 3.09 100,000 700 309,432 Biaya 12-Apr-20 12-Apr-20 309,432 LT1 STR B 1 2
7 B03 [ 442,1 kg / 1 h 442 kg U-033 [ kg ] Pembesia 3 U-033.3 A.4.1. 0.00 OH Kepala Tuk L.9 0.31 150,000 105 46,415 Biaya 12-Apr-20 12-Apr-20 46,415 LT1 STR B 1 2
7 B03 [ 442,1 kg / 1 h 442 kg U-033 [ kg ] Pembesia 4 U-033.4 A.4.1. 0.00 OH Mandor ( O L.10 0.18 185,000 74 32,711 Biaya 12-Apr-20 12-Apr-20 32,711 LT1 STR B 1 1
7 B03 [ 442,1 kg / 1 h 442 kg U-033 [ kg ] Pembesia 5 U-033.5 A.4.1. 1.05 kg Besi beton ( M.16 464.15 10,000 10,500 4,641,476 Biaya 12-Apr-20 12-Apr-20 4,641,476 LT1 STR B - -
7 B03 [ 442,1 kg / 1 h 442 kg U-033 [ kg ] Pembesia 6 U-033.6 A.4.1. 0.02 kg Kawat betonM.27 6.63 23,500 353 155,821
Biaya Bahan 12-Apr-20 12-Apr-20 155,821 LT1 STR B - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

7 8 B04 [ 25,2 m2 / 3 har 25.2 m2 U-034 [ m2 ] (K3) Pe 1 U-034.1 A.4.1. 0.52 OH Pekerja ( O L.1 13.10 85,000 44,200 1,113,840 Biaya 182,985 12-Apr-20 14-Apr-20 371,280 LT1 STR B 3 3.0 5
8 B04 [ 25,2 m2 / 3 har 25.2 m2 U-034 [ m2 ] (K3) Pe 2 U-034.2 A.4.1. 0.26 OH Tukang Kay L.6 6.55 100,000 26,000 655,200 Biaya 12-Apr-20 14-Apr-20 218,400 LT1 STR B 1 2
8 B04 [ 25,2 m2 / 3 har 25.2 m2 U-034 [ m2 ] (K3) Pe 3 U-034.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.66 150,000 3,900 98,280 Biaya 12-Apr-20 14-Apr-20 32,760 LT1 STR B 1 2
8 B04 [ 25,2 m2 / 3 har 25.2 m2 U-034 [ m2 ] (K3) Pe 4 U-034.4 A.4.1. 0.03 OH Mandor ( O L.10 0.66 185,000 4,810 121,212 Biaya 12-Apr-20 14-Apr-20 40,404 LT1 STR B 1 1
8 B04 [ 25,2 m2 / 3 har 25.2 m2 U-034 [ m2 ] (K3) Pe 5 U-034.5 A.4.1. 0.04 m3 Papan KayuM.107 1.01 2,300,000 92,000 2,318,400 Biaya 12-Apr-20 14-Apr-20 772,800 LT1 STR B - -
8 B04 [ 25,2 m2 / 3 har 25.2 m2 U-034 [ m2 ] (K3) Pe 6 U-034.6 A.4.1. 0.30 kg Paku Biasa 2M.111 7.56 25,000 7,500 189,000
Biaya Bahan 12-Apr-20 14-Apr-20 63,000 LT1 STR B - -
8 B04 [ 25,2 m2 / 3 har 25.2 m2 U-034 [ m2 ] (K3) Pe 7 U-034.7 A.4.1. 0.10 Ltr Minyak bekiM.141 2.52 45,750 4,575 115,290
Biaya Bahan 12-Apr-20 14-Apr-20 38,430 LT1 STR B - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

8 9 B05 [ 4 m3 / 1 hari ] 3.99 m3 U-027 [ m3 ] Membua 1 U-027.1 A.4.1. 1.65 OH Pekerja ( O L.1 6.58 85,000 140,250 559,598 Biaya 975,620 14-Apr-20 14-Apr-20 559,598 LT1 STR B 3 1.0 5
9 B05 [ 4 m3 / 1 hari ] 3.99 m3 U-027 [ m3 ] Membua 2 U-027.2 A.4.1. 0.28 OH Tukang Bat L.3 1.10 100,000 27,500 109,725 Biaya 14-Apr-20 14-Apr-20 109,725 LT1 STR B 1 2
9 B05 [ 4 m3 / 1 hari ] 3.99 m3 U-027 [ m3 ] Membua 3 U-027.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.11 150,000 4,200 16,758 Biaya 14-Apr-20 14-Apr-20 16,758 LT1 STR B 1 2
9 B05 [ 4 m3 / 1 hari ] 3.99 m3 U-027 [ m3 ] Membua 4 U-027.4 A.4.1. 0.08 OH Mandor ( O L.10 0.33 185,000 15,355 61,266 Biaya 14-Apr-20 14-Apr-20 61,266 LT1 STR B 1 1
9 B05 [ 4 m3 / 1 hari ] 3.99 m3 U-027 [ m3 ] Membua 5 U-027.5 A.4.1. 371.00 kg Semen ( kg M.12 1480.29 1,300 482,300 1,924,377 Biaya 14-Apr-20 14-Apr-20 1,924,377 LT1 STR B - -
9 B05 [ 4 m3 / 1 hari ] 3.99 m3 U-027 [ m3 ] Membua 6 U-027.6 A.4.1. 0.50 m3 Pasir Beton M.8 1.99 250,000 124,643 497,325
Biaya Bahan 14-Apr-20 14-Apr-20 497,325 LT1 STR B - -
9 B05 [ 4 m3 / 1 hari ] 3.99 m3 U-027 [ m3 ] Membua 7 U-027.7 A.4.1. 0.78 m3 Kerikil ( m3 M.7 3.09 220,000 170,622 680,783
Biaya Bahan 14-Apr-20 14-Apr-20 680,783 LT1 STR B - -
9 B05 [ 4 m3 / 1 hari ] 3.99 m3 U-027 [ m3 ] Membua 8 U-027.8 A.4.1. 215.00 Ltr Air ( Ltr ) M.1 857.85 50 10,750 42,893
Biaya Bahan 14-Apr-20 14-Apr-20 42,893 LT1 STR B - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

2 10 B06 [ 46,9 m3 / 8 har 46.889 m3 U-007 [ m3 ] Penggal 1 U-007.1 A.2.3. 0.90 OH Pekerja ( O L.1 42.20 85,000 76,500 3,587,030 Biaya 84,825 14-Apr-20 21-Apr-20 448,379 LT1 STR B 3 8.0 5
10 B06 [ 46,9 m3 / 8 har 46.889 m3 U-007 [ m3 ] Penggal 2 U-007.2 A.2.3. 0.05 OH Mandor ( O L.10 2.11 185,000 8,325 390,353 Biaya 14-Apr-20 21-Apr-20 48,794 LT1 STR B 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

3 11 B07 [ 2,9 m3 / 1 har 2.8944 m3 U-008 [ m3 ] Penguru 1 U-008.1 A.2.3. 0.30 OH Pekerja ( O L.1 0.87 85,000 25,500 73,807 Biaya 267,350 21-Apr-20 21-Apr-20 73,807 LT1 STR B 3 1.0 5
11 B07 [ 2,9 m3 / 1 har 2.8944 m3 U-008 [ m3 ] Penguru 2 U-008.2 A.2.3. 0.01 OH Mandor ( O L.10 0.03 185,000 1,850 5,355 Biaya 21-Apr-20 21-Apr-20 5,355 LT1 STR B 1 1
11 B07 [ 2,9 m3 / 1 har 2.8944 m3 U-008 [ m3 ] Penguru 3 U-008.3 A.2.3. 1.20 M3 Pasir urug M.10 3.47 200,000 240,000 694,656 Biaya 21-Apr-20 21-Apr-20 694,656 LT1 STR B - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 12 B08 [ 8,7 m3 / 2 har 8.6832 m3 U-011 [ m3 ] Pemasa 1 U-011.1 A.3.2. 0.78 OH Pekerja ( O L.1 6.77 85,000 66,300 575,696 Biaya 504,765 21-Apr-20 22-Apr-20 287,848 LT1 STR B 3 2.0 5
12 B08 [ 8,7 m3 / 2 har 8.6832 m3 U-011 [ m3 ] Pemasa 2 U-011.2 A.3.2. 0.39 OH Tukang Bat L.3 3.39 100,000 39,000 338,645 Biaya 21-Apr-20 22-Apr-20 169,322 LT1 STR B 1 2
12 B08 [ 8,7 m3 / 2 har 8.6832 m3 U-011 [ m3 ] Pemasa 3 U-011.3 A.3.2. 0.04 OH Kepala Tuk L.9 0.34 150,000 5,850 50,797 Biaya 21-Apr-20 22-Apr-20 25,398 LT1 STR B 1 2
12 B08 [ 8,7 m3 / 2 har 8.6832 m3 U-011 [ m3 ] Pemasa 4 U-011.4 A.3.2. 0.04 OH Mandor ( O L.10 0.34 185,000 7,215 62,649 Biaya 21-Apr-20 22-Apr-20 31,325 LT1 STR B 1 1
12 B08 [ 8,7 m3 / 2 har 8.6832 m3 U-011 [ m3 ] Pemasa 5 U-011.5 A.3.2. 1.20 m3 Batu belah M.5 10.42 250,000 300,000 2,604,960 Biaya 21-Apr-20 22-Apr-20 1,302,480 LT1 STR B - -
12 B08 [ 8,7 m3 / 2 har 8.6832 m3 U-011 [ m3 ] Pemasa 6 U-011.6 A.3.2. 0.43 m3 Pasir urug M.10 3.75 200,000 86,400 750,228
Biaya Bahan 21-Apr-20 22-Apr-20 375,114 LT1 STR B - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

7 13 B09 [ 30,4 m3 / 8 har 30.391 m3 U-012 [ m3 ] Pemasa 1 U-012.1 A.3.2. 1.50 OH Pekerja ( O L.1 45.59 85,000 127,500 3,874,878 Biaya 913,900 22-Apr-20 29-Apr-20 484,360 LT1 STR B 3 8.0 5
13 B09 [ 30,4 m3 / 8 har 30.391 m3 U-012 [ m3 ] Pemasa 2 U-012.2 A.3.2. 0.75 OH Tukang Bat L.3 22.79 100,000 75,000 2,279,340 Biaya 22-Apr-20 29-Apr-20 284,918 LT1 STR B 1 2
13 B09 [ 30,4 m3 / 8 har 30.391 m3 U-012 [ m3 ] Pemasa 3 U-012.3 A.3.2. 0.08 OH Kepala Tuk L.9 2.28 150,000 11,250 341,901 Biaya 22-Apr-20 29-Apr-20 42,738 LT1 STR B 1 2
13 B09 [ 30,4 m3 / 8 har 30.391 m3 U-012 [ m3 ] Pemasa 4 U-012.4 A.3.2. 0.08 OH Mandor ( O L.10 2.28 185,000 13,875 421,678 Biaya 22-Apr-20 29-Apr-20 52,710 LT1 STR B 1 1
13 B09 [ 30,4 m3 / 8 har 30.391 m3 U-012 [ m3 ] Pemasa 5 U-012.5 A.3.2. 1.20 m3 Batu belah M.5 36.47 250,000 300,000 9,117,360 Biaya 22-Apr-20 29-Apr-20 1,139,670 LT1 STR B - -
13 B09 [ 30,4 m3 / 8 har 30.391 m3 U-012 [ m3 ] Pemasa 6 U-012.6 A.3.2. 202.00 Kg Semen ( Kg M.12 6139.02 1,300 262,600 7,980,729
Biaya Bahan 22-Apr-20 29-Apr-20 997,591 LT1 STR B - -
13 B09 [ 30,4 m3 / 8 har 30.391 m3 U-012 [ m3 ] Pemasa 7 U-012.7 A.3.2. 0.49 m3 Pasir Pasan M.9 14.74 255,000 123,675 3,758,632
Biaya Bahan 22-Apr-20 29-Apr-20 469,829 LT1 STR B - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

2 14 B10 [ 0,4 m3 / 1 hari 0.34 m3 U-007 [ m3 ] Penggal 1 U-007.1 A.2.3. 0.90 OH Pekerja ( O L.1 0.31 85,000 76,500 26,010 Biaya 84,825 29-Apr-20 29-Apr-20 26,010 LT1 STR B 3 1.0 5
14 B10 [ 0,4 m3 / 1 hari 0.34 m3 U-007 [ m3 ] Penggal 2 U-007.2 A.2.3. 0.05 OH Mandor ( O L.10 0.02 185,000 8,325 2,831 Biaya 29-Apr-20 29-Apr-20 2,831 LT1 STR B 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

7 15 B11 [ 0,7 m1 / 1 hari 0.68 m1 U-014 [ m1 ] Memasan 1 U-014.1 SNI-2 17.00 bh Bata merah M.2 11.56 650 11,050 7,514 Biaya 29-Apr-20 29-Apr-20 7,514 LT1 STR B - 1.0 -
15 B11 [ 0,7 m1 / 1 hari 0.68 m1 U-014 [ m1 ] Memasan 2 U-014.2 SNI-2 4.94 kg Semen ( kg M.12 3.36 1,300 6,425 4,369 Biaya 29-Apr-20 29-Apr-20 4,369 LT1 STR B - -
15 B11 [ 0,7 m1 / 1 hari 0.68 m1 U-014 [ m1 ] Memasan 3 U-014.3 SNI-2 0.01 m3 Pasir pasan M.9 0.01 255,000 3,494 2,376 Biaya 29-Apr-20 29-Apr-20 2,376 LT1 STR B - -
15 B11 [ 0,7 m1 / 1 hari 0.68 m1 U-014 [ m1 ] Memasan 4 U-014.4 SNI-2 0.09 oh Pekerja ( oh L.1 0.06 85,000 7,650 5,202 Biaya 32,901 29-Apr-20 29-Apr-20 5,202 LT1 STR B 3 5
15 B11 [ 0,7 m1 / 1 hari 0.68 m1 U-014 [ m1 ] Memasan 5 U-014.5 SNI-2 0.03 oh Tukang batu L.3 0.02 100,000 3,000 2,040 Biaya 29-Apr-20 29-Apr-20 2,040 LT1 STR B 1 2
15 B11 [ 0,7 m1 / 1 hari 0.68 m1 U-014 [ m1 ] Memasan 6 U-014.6 SNI-2 0.00 oh Kepala tuka L.9 0.00 150,000 450 306
Biaya Upah 29-Apr-20 29-Apr-20 306 LT1 STR B 1 2
15 B11 [ 0,7 m1 / 1 hari 0.68 m1 U-014 [ m1 ] Memasan 7 U-014.7 SNI-2 0.00 oh Mandor ( oh L.10 0.00 185,000 833 566
Biaya Upah 29-Apr-20 29-Apr-20 566 LT1 STR B 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 16 C01 [ 642,7 kg / 1 ha 642.64 kg U-033 [ kg ] Pembesia 1 U-033.1 A.4.1. 0.01 OH Pekerja ( O L.1 4.50 85,000 595 382,371 Biaya 12,327 29-Apr-20 29-Apr-20 382,371 LT1 STR C 3 1.0 5
16 C01 [ 642,7 kg / 1 ha 642.64 kg U-033 [ kg ] Pembesia 2 U-033.2 A.4.1. 0.01 OH Tukang Bes L.4 4.50 100,000 700 449,848 Biaya 29-Apr-20 29-Apr-20 449,848 LT1 STR C 1 2
16 C01 [ 642,7 kg / 1 ha 642.64 kg U-033 [ kg ] Pembesia 3 U-033.3 A.4.1. 0.00 OH Kepala Tuk L.9 0.45 150,000 105 67,477 Biaya 29-Apr-20 29-Apr-20 67,477 LT1 STR C 1 2
16 C01 [ 642,7 kg / 1 ha 642.64 kg U-033 [ kg ] Pembesia 4 U-033.4 A.4.1. 0.00 OH Mandor ( O L.10 0.26 185,000 74 47,555 Biaya 29-Apr-20 29-Apr-20 47,555 LT1 STR C 1 1
16 C01 [ 642,7 kg / 1 ha 642.64 kg U-033 [ kg ] Pembesia 5 U-033.5 A.4.1. 1.05 kg Besi beton ( M.16 674.77 10,000 10,500 6,747,716 Biaya 29-Apr-20 29-Apr-20 6,747,716 LT1 STR C - -
16 C01 [ 642,7 kg / 1 ha 642.64 kg U-033 [ kg ] Pembesia 6 U-033.6 A.4.1. 0.02 kg Kawat betonM.27 9.64 23,500 353 226,530
Biaya Bahan 29-Apr-20 29-Apr-20 226,530 LT1 STR C - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

7 17 C02 [ 38,4 m2 / 4 har 38.4 m2 U-035 [ m2 ] (K3) Pe 1 U-035.1 A.4.1. 0.52 OH Pekerja ( O L.1 19.97 85,000 44,200 1,697,280 Biaya 194,485 29-Apr-20 02-May-20 424,320 LT1 STR C 3 4.0 5
17 C02 [ 38,4 m2 / 4 har 38.4 m2 U-035 [ m2 ] (K3) Pe 2 U-035.2 A.4.1. 0.26 OH Tukang Kay L.6 9.98 100,000 26,000 998,400 Biaya 29-Apr-20 02-May-20 249,600 LT1 STR C 1 2
17 C02 [ 38,4 m2 / 4 har 38.4 m2 U-035 [ m2 ] (K3) Pe 3 U-035.3 A.4.1. 0.03 OH Kepala Tuk L.9 1.00 150,000 3,900 149,760 Biaya 29-Apr-20 02-May-20 37,440 LT1 STR C 1 2
17 C02 [ 38,4 m2 / 4 har 38.4 m2 U-035 [ m2 ] (K3) Pe 4 U-035.4 A.4.1. 0.03 OH Mandor ( O L.10 1.00 185,000 4,810 184,704 Biaya 29-Apr-20 02-May-20 46,176 LT1 STR C 1 1
17 C02 [ 38,4 m2 / 4 har 38.4 m2 U-035 [ m2 ] (K3) Pe 5 U-035.5 A.4.1. 0.05 m3 Papan KayuM.107 1.73 2,300,000 103,500 3,974,400 Biaya 29-Apr-20 02-May-20 993,600 LT1 STR C - -
17 C02 [ 38,4 m2 / 4 har 38.4 m2 U-035 [ m2 ] (K3) Pe 6 U-035.6 A.4.1. 0.30 kg Paku Biasa 2M.111 11.52 25,000 7,500 288,000
Biaya Bahan 29-Apr-20 02-May-20 72,000 LT1 STR C - -
17 C02 [ 38,4 m2 / 4 har 38.4 m2 U-035 [ m2 ] (K3) Pe 7 U-035.7 A.4.1. 0.10 Ltr Minyak bekiM.141 3.84 45,750 4,575 175,680
Biaya Bahan 29-Apr-20 02-May-20 43,920 LT1 STR C - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

8 18 C03 [ 3,9 m3 / 1 hari 3.84 m3 U-027 [ m3 ] Membua 1 U-027.1 A.4.1. 1.65 OH Pekerja ( O L.1 6.34 85,000 140,250 538,560 Biaya 975,620 2-May-20 02-May-20 538,560 LT1 STR C 3 1.0 5
18 C03 [ 3,9 m3 / 1 hari 3.84 m3 U-027 [ m3 ] Membua 2 U-027.2 A.4.1. 0.28 OH Tukang Bat L.3 1.06 100,000 27,500 105,600 Biaya 2-May-20 02-May-20 105,600 LT1 STR C 1 2
18 C03 [ 3,9 m3 / 1 hari 3.84 m3 U-027 [ m3 ] Membua 3 U-027.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.11 150,000 4,200 16,128 Biaya 2-May-20 02-May-20 16,128 LT1 STR C 1 2
18 C03 [ 3,9 m3 / 1 hari 3.84 m3 U-027 [ m3 ] Membua 4 U-027.4 A.4.1. 0.08 OH Mandor ( O L.10 0.32 185,000 15,355 58,963 Biaya 2-May-20 02-May-20 58,963 LT1 STR C 1 1
18 C03 [ 3,9 m3 / 1 hari 3.84 m3 U-027 [ m3 ] Membua 5 U-027.5 A.4.1. 371.00 kg Semen ( kg M.12 1424.64 1,300 482,300 1,852,032 Biaya 2-May-20 02-May-20 1,852,032 LT1 STR C - -
18 C03 [ 3,9 m3 / 1 hari 3.84 m3 U-027 [ m3 ] Membua 6 U-027.6 A.4.1. 0.50 m3 Pasir Beton M.8 1.91 250,000 124,643 478,629
Biaya Bahan 2-May-20 02-May-20 478,629 LT1 STR C - -
18 C03 [ 3,9 m3 / 1 hari 3.84 m3 U-027 [ m3 ] Membua 7 U-027.7 A.4.1. 0.78 m3 Kerikil ( m3 M.7 2.98 220,000 170,622 655,189
Biaya Bahan 2-May-20 02-May-20 655,189 LT1 STR C - -
18 C03 [ 3,9 m3 / 1 hari 3.84 m3 U-027 [ m3 ] Membua 8 U-027.8 A.4.1. 215.00 Ltr Air ( Ltr ) M.1 825.60 50 10,750 41,280
Biaya Bahan 2-May-20 02-May-20 41,280 LT1 STR C - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 19 C04 [ 68,3 kg / 1 har 68.285 kg U-033 [ kg ] Pembesia 1 U-033.1 A.4.1. 0.01 OH Pekerja ( O L.1 0.48 85,000 595 40,629 Biaya 12,327 29-Apr-20 29-Apr-20 40,629 LT1 STR C 3 1.0 5
19 C04 [ 68,3 kg / 1 har 68.285 kg U-033 [ kg ] Pembesia 2 U-033.2 A.4.1. 0.01 OH Tukang Bes L.4 0.48 100,000 700 47,799 Biaya 29-Apr-20 29-Apr-20 47,799 LT1 STR C 1 2
19 C04 [ 68,3 kg / 1 har 68.285 kg U-033 [ kg ] Pembesia 3 U-033.3 A.4.1. 0.00 OH Kepala Tuk L.9 0.05 150,000 105 7,170 Biaya 29-Apr-20 29-Apr-20 7,170 LT1 STR C 1 2
19 C04 [ 68,3 kg / 1 har 68.285 kg U-033 [ kg ] Pembesia 4 U-033.4 A.4.1. 0.00 OH Mandor ( O L.10 0.03 185,000 74 5,053 Biaya 29-Apr-20 29-Apr-20 5,053 LT1 STR C 1 1
19 C04 [ 68,3 kg / 1 har 68.285 kg U-033 [ kg ] Pembesia 5 U-033.5 A.4.1. 1.05 kg Besi beton ( M.16 71.70 10,000 10,500 716,989 Biaya 29-Apr-20 29-Apr-20 716,989 LT1 STR C - -
19 C04 [ 68,3 kg / 1 har 68.285 kg U-033 [ kg ] Pembesia 6 U-033.6 A.4.1. 0.02 kg Kawat betonM.27 1.02 23,500 353 24,070
Biaya Bahan 29-Apr-20 29-Apr-20 24,070 LT1 STR C - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

7 20 C05 [ 6,4 m2 / 1 hari 6.4 m2 U-035 [ m2 ] (K3) Pe 1 U-035.1 A.4.1. 0.52 OH Pekerja ( O L.1 3.33 85,000 44,200 282,880 Biaya 194,485 2-May-20 02-May-20 282,880 LT1 STR C 3 1.0 5
20 C05 [ 6,4 m2 / 1 hari 6.4 m2 U-035 [ m2 ] (K3) Pe 2 U-035.2 A.4.1. 0.26 OH Tukang Kay L.6 1.66 100,000 26,000 166,400 Biaya 2-May-20 02-May-20 166,400 LT1 STR C 1 2
20 C05 [ 6,4 m2 / 1 hari 6.4 m2 U-035 [ m2 ] (K3) Pe 3 U-035.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.17 150,000 3,900 24,960 Biaya 2-May-20 02-May-20 24,960 LT1 STR C 1 2
20 C05 [ 6,4 m2 / 1 hari 6.4 m2 U-035 [ m2 ] (K3) Pe 4 U-035.4 A.4.1. 0.03 OH Mandor ( O L.10 0.17 185,000 4,810 30,784 Biaya 2-May-20 02-May-20 30,784 LT1 STR C 1 1
20 C05 [ 6,4 m2 / 1 hari 6.4 m2 U-035 [ m2 ] (K3) Pe 5 U-035.5 A.4.1. 0.05 m3 Papan KayuM.107 0.29 2,300,000 103,500 662,400 Biaya 2-May-20 02-May-20 662,400 LT1 STR C - -
20 C05 [ 6,4 m2 / 1 hari 6.4 m2 U-035 [ m2 ] (K3) Pe 6 U-035.6 A.4.1. 0.30 kg Paku Biasa 2M.111 1.92 25,000 7,500 48,000
Biaya Bahan 2-May-20 02-May-20 48,000 LT1 STR C - -
20 C05 [ 6,4 m2 / 1 hari 6.4 m2 U-035 [ m2 ] (K3) Pe 7 U-035.7 A.4.1. 0.10 Ltr Minyak bekiM.141 0.64 45,750 4,575 29,280
Biaya Bahan 2-May-20 02-May-20 29,280 LT1 STR C - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

8 21 C06 [ 0,5 m3 / 1 hari 0.48 m3 U-027 [ m3 ] Membua 1 U-027.1 A.4.1. 1.65 OH Pekerja ( O L.1 0.79 85,000 140,250 67,320 Biaya 975,620 2-May-20 02-May-20 67,320 LT1 STR C 3 1.0 5
21 C06 [ 0,5 m3 / 1 hari 0.48 m3 U-027 [ m3 ] Membua 2 U-027.2 A.4.1. 0.28 OH Tukang Bat L.3 0.13 100,000 27,500 13,200 Biaya 2-May-20 02-May-20 13,200 LT1 STR C 1 2
21 C06 [ 0,5 m3 / 1 hari 0.48 m3 U-027 [ m3 ] Membua 3 U-027.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.01 150,000 4,200 2,016 Biaya 2-May-20 02-May-20 2,016 LT1 STR C 1 2
21 C06 [ 0,5 m3 / 1 hari 0.48 m3 U-027 [ m3 ] Membua 4 U-027.4 A.4.1. 0.08 OH Mandor ( O L.10 0.04 185,000 15,355 7,370 Biaya 2-May-20 02-May-20 7,370 LT1 STR C 1 1
21 C06 [ 0,5 m3 / 1 hari 0.48 m3 U-027 [ m3 ] Membua 5 U-027.5 A.4.1. 371.00 kg Semen ( kg M.12 178.08 1,300 482,300 231,504 Biaya 2-May-20 02-May-20 231,504 LT1 STR C - -
21 C06 [ 0,5 m3 / 1 hari 0.48 m3 U-027 [ m3 ] Membua 6 U-027.6 A.4.1. 0.50 m3 Pasir Beton M.8 0.24 250,000 124,643 59,829
Biaya Bahan 2-May-20 02-May-20 59,829 LT1 STR C - -
21 C06 [ 0,5 m3 / 1 hari 0.48 m3 U-027 [ m3 ] Membua 7 U-027.7 A.4.1. 0.78 m3 Kerikil ( m3 M.7 0.37 220,000 170,622 81,899
Biaya Bahan 2-May-20 02-May-20 81,899 LT1 STR C - -
21 C06 [ 0,5 m3 / 1 hari 0.48 m3 U-027 [ m3 ] Membua 8 U-027.8 A.4.1. 215.00 Ltr Air ( Ltr ) M.1 103.20 50 10,750 5,160
Biaya Bahan 2-May-20 02-May-20 5,160 LT1 STR C - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

3 22 D01 [ 38 m3 / 2 hari 38 m3 U-009 [ m3 ] Urug t 1 U-009.1 AK-SN 1.20 m3 Tanah urug M.14 45.60 160,000 192,000 7,296,000 Biaya 3-May-20 04-May-20 3,648,000 LT1 OTH D - 2.0 -
22 D01 [ 38 m3 / 2 hari 38 m3 U-009 [ m3 ] Urug t 2 U-009.2 AK-SN 0.30 oh Pekerja ( oh L.1 11.40 85,000 25,500 969,000 Biaya 219,350 3-May-20 04-May-20 484,500 LT1 OTH D 3 5
22 D01 [ 38 m3 / 2 hari 38 m3 U-009 [ m3 ] Urug t 3 U-009.3 AK-SN 0.01 oh Mandor ( oh L.10 0.38 185,000 1,850 70,300 Biaya 3-May-20 04-May-20 35,150 LT1 OTH D 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

2 23 D02 [ 4,6 m3 / 1 har 4.56 m3 U-010 [ m3 ] Pemadat 1 U-010.1 A.2.3. 0.50 OH Pekerja ( O L.1 2.28 85,000 42,500 193,800 Biaya 51,750 5-May-20 05-May-20 193,800 LT1 OTH D 3 1.0 5
23 D02 [ 4,6 m3 / 1 har 4.56 m3 U-010 [ m3 ] Pemadat 2 U-010.2 A.2.3. 0.05 OH Mandor ( O L.10 0.23 185,000 9,250 42,180 Biaya 5-May-20 05-May-20 42,180 LT1 OTH D 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 24 E01 [ 489,7 kg / 1 h 489.64 kg U-033 [ kg ] Pembesia 1 U-033.1 A.4.1. 0.01 OH Pekerja ( O L.1 3.43 85,000 595 291,333 Biaya 12,327 4-May-20 04-May-20 291,333 LT1 STR E 3 1.0 5
24 E01 [ 489,7 kg / 1 h 489.64 kg U-033 [ kg ] Pembesia 2 U-033.2 A.4.1. 0.01 OH Tukang Bes L.4 3.43 100,000 700 342,745 Biaya 4-May-20 04-May-20 342,745 LT1 STR E 1 2
24 E01 [ 489,7 kg / 1 h 489.64 kg U-033 [ kg ] Pembesia 3 U-033.3 A.4.1. 0.00 OH Kepala Tuk L.9 0.34 150,000 105 51,412 Biaya 4-May-20 04-May-20 51,412 LT1 STR E 1 2
24 E01 [ 489,7 kg / 1 h 489.64 kg U-033 [ kg ] Pembesia 4 U-033.4 A.4.1. 0.00 OH Mandor ( O L.10 0.20 185,000 74 36,233 Biaya 4-May-20 04-May-20 36,233 LT1 STR E 1 1
24 E01 [ 489,7 kg / 1 h 489.64 kg U-033 [ kg ] Pembesia 5 U-033.5 A.4.1. 1.05 kg Besi beton ( M.16 514.12 10,000 10,500 5,141,173 Biaya 4-May-20 04-May-20 5,141,173 LT1 STR E - -
24 E01 [ 489,7 kg / 1 h 489.64 kg U-033 [ kg ] Pembesia 6 U-033.6 A.4.1. 0.02 kg Kawat betonM.27 7.34 23,500 353 172,597
Biaya Bahan 4-May-20 04-May-20 172,597 LT1 STR E - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

### 25 E02 [ 50,4 m2 / 6 har 50.4 m2 U-036 [ m2 ] (K3) P 1 U-036.1 A.4.1. 0.66 OH Pekerja ( O L.1 33.26 85,000 56,100 2,827,440 Biaya 369,055 4-May-20 09-May-20 471,240 LT1 STR E 3 6.0 5
25 E02 [ 50,4 m2 / 6 har 50.4 m2 U-036 [ m2 ] (K3) P 2 U-036.2 A.4.1. 0.33 OH Tukang Kay L.6 16.63 100,000 33,000 1,663,200 Biaya 4-May-20 09-May-20 277,200 LT1 STR E 1 2
25 E02 [ 50,4 m2 / 6 har 50.4 m2 U-036 [ m2 ] (K3) P 3 U-036.3 A.4.1. 0.03 OH Kepala Tuk L.9 1.66 150,000 4,950 249,480 Biaya 4-May-20 09-May-20 41,580 LT1 STR E 1 2
25 E02 [ 50,4 m2 / 6 har 50.4 m2 U-036 [ m2 ] (K3) P 4 U-036.4 A.4.1. 0.03 OH Mandor ( O L.10 1.66 185,000 6,105 307,692 Biaya 4-May-20 09-May-20 51,282 LT1 STR E 1 1
25 E02 [ 50,4 m2 / 6 har 50.4 m2 U-036 [ m2 ] (K3) P 5 U-036.5 A.4.1. 0.04 m3 Papan KayuM.107 2.02 2,300,000 92,000 4,636,800 Biaya 4-May-20 09-May-20 772,800 LT1 STR E - -
25 E02 [ 50,4 m2 / 6 har 50.4 m2 U-036 [ m2 ] (K3) P 6 U-036.6 A.4.1. 0.40 kg Paku Biasa 2M.111 20.16 25,000 10,000 504,000
Biaya Bahan 4-May-20 09-May-20 84,000 LT1 STR E - -
25 E02 [ 50,4 m2 / 6 har 50.4 m2 U-036 [ m2 ] (K3) P 7 U-036.7 A.4.1. 0.20 Ltr Minyak bekiM.141 10.08 45,750 9,150 461,160
Biaya Bahan 4-May-20 09-May-20 76,860 LT1 STR E - -
25 E02 [ 50,4 m2 / 6 har 50.4 m2 U-036 [ m2 ] (K3) P 8 U-036.8 A.4.1. 0.02 m3 Balok Kayu M.98 0.76 3,100,000 46,500 2,343,600
Biaya Bahan 4-May-20 09-May-20 390,600 LT1 STR E - -
25 E02 [ 50,4 m2 / 6 har 50.4 m2 U-036 [ m2 ] (K3) P 9 U-036.9 A.4.1. 0.35 Lbr Plywood 120M.60 17.64 175,000 61,250 3,087,000
Biaya Bahan 4-May-20 09-May-20 514,500 LT1 STR E - -
25 E02 [ 50,4 m2 / 6 har 50.4 m2 U-036 [ m2 ] (K3) P 10 U-036.10 A.4.1. 2.00 btg Dolken kayuM.104 100.80 25,000 50,000 2,520,000
Biaya Bahan 4-May-20 09-May-20 420,000 LT1 STR E - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

8 26 E03 [ 4,4 m3 / 1 hari 4.32 m3 U-027 [ m3 ] Membua 1 U-027.1 A.4.1. 1.65 OH Pekerja ( O L.1 7.13 85,000 140,250 605,880 Biaya 975,620 9-May-20 09-May-20 605,880 LT1 STR E 3 1.0 5
26 E03 [ 4,4 m3 / 1 hari 4.32 m3 U-027 [ m3 ] Membua 2 U-027.2 A.4.1. 0.28 OH Tukang Bat L.3 1.19 100,000 27,500 118,800 Biaya 9-May-20 09-May-20 118,800 LT1 STR E 1 2
26 E03 [ 4,4 m3 / 1 hari 4.32 m3 U-027 [ m3 ] Membua 3 U-027.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.12 150,000 4,200 18,144 Biaya 9-May-20 09-May-20 18,144 LT1 STR E 1 2
26 E03 [ 4,4 m3 / 1 hari 4.32 m3 U-027 [ m3 ] Membua 4 U-027.4 A.4.1. 0.08 OH Mandor ( O L.10 0.36 185,000 15,355 66,334 Biaya 9-May-20 09-May-20 66,334 LT1 STR E 1 1
26 E03 [ 4,4 m3 / 1 hari 4.32 m3 U-027 [ m3 ] Membua 5 U-027.5 A.4.1. 371.00 kg Semen ( kg M.12 1602.72 1,300 482,300 2,083,536 Biaya 9-May-20 09-May-20 2,083,536 LT1 STR E - -
26 E03 [ 4,4 m3 / 1 hari 4.32 m3 U-027 [ m3 ] Membua 6 U-027.6 A.4.1. 0.50 m3 Pasir Beton M.8 2.15 250,000 124,643 538,457
Biaya Bahan 9-May-20 09-May-20 538,457 LT1 STR E - -
26 E03 [ 4,4 m3 / 1 hari 4.32 m3 U-027 [ m3 ] Membua 7 U-027.7 A.4.1. 0.78 m3 Kerikil ( m3 M.7 3.35 220,000 170,622 737,088
Biaya Bahan 9-May-20 09-May-20 737,088 LT1 STR E - -
26 E03 [ 4,4 m3 / 1 hari 4.32 m3 U-027 [ m3 ] Membua 8 U-027.8 A.4.1. 215.00 Ltr Air ( Ltr ) M.1 928.80 50 10,750 46,440
Biaya Bahan 9-May-20 09-May-20 46,440 LT1 STR E - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
6 27 E04 [ 190,2 kg / 1 h 190.11 kg U-033 [ kg ] Pembesia 1 U-033.1 A.4.1. 0.01 OH Pekerja ( O L.1 1.33 85,000 595 113,113 Biaya 12,327 5-May-20 05-May-20 113,113 LT1 STR E 3 1.0 5
27 E04 [ 190,2 kg / 1 h 190.11 kg U-033 [ kg ] Pembesia 2 U-033.2 A.4.1. 0.01 OH Tukang Bes L.4 1.33 100,000 700 133,074 Biaya 5-May-20 05-May-20 133,074 LT1 STR E 1 2
27 E04 [ 190,2 kg / 1 h 190.11 kg U-033 [ kg ] Pembesia 3 U-033.3 A.4.1. 0.00 OH Kepala Tuk L.9 0.13 150,000 105 19,961 Biaya 5-May-20 05-May-20 19,961 LT1 STR E 1 2
27 E04 [ 190,2 kg / 1 h 190.11 kg U-033 [ kg ] Pembesia 4 U-033.4 A.4.1. 0.00 OH Mandor ( O L.10 0.08 185,000 74 14,068 Biaya 5-May-20 05-May-20 14,068 LT1 STR E 1 1
27 E04 [ 190,2 kg / 1 h 190.11 kg U-033 [ kg ] Pembesia 5 U-033.5 A.4.1. 1.05 kg Besi beton ( M.16 199.61 10,000 10,500 1,996,105 Biaya 5-May-20 05-May-20 1,996,105 LT1 STR E - -
27 E04 [ 190,2 kg / 1 h 190.11 kg U-033 [ kg ] Pembesia 6 U-033.6 A.4.1. 0.02 kg Kawat betonM.27 2.85 23,500 353 67,012
Biaya Bahan 5-May-20 05-May-20 67,012 LT1 STR E - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

### 28 E05 [ 27,6 m2 / 3 har 27.6 m2 U-036 [ m2 ] (K3) P 1 U-036.1 A.4.1. 0.66 OH Pekerja ( O L.1 18.22 85,000 56,100 1,548,360 Biaya 369,055 10-May-20 12-May-20 516,120 LT1 STR E 3 3.0 5
28 E05 [ 27,6 m2 / 3 har 27.6 m2 U-036 [ m2 ] (K3) P 2 U-036.2 A.4.1. 0.33 OH Tukang Kay L.6 9.11 100,000 33,000 910,800 Biaya 10-May-20 12-May-20 303,600 LT1 STR E 1 2
28 E05 [ 27,6 m2 / 3 har 27.6 m2 U-036 [ m2 ] (K3) P 3 U-036.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.91 150,000 4,950 136,620 Biaya 10-May-20 12-May-20 45,540 LT1 STR E 1 2
28 E05 [ 27,6 m2 / 3 har 27.6 m2 U-036 [ m2 ] (K3) P 4 U-036.4 A.4.1. 0.03 OH Mandor ( O L.10 0.91 185,000 6,105 168,498 Biaya 10-May-20 12-May-20 56,166 LT1 STR E 1 1
28 E05 [ 27,6 m2 / 3 har 27.6 m2 U-036 [ m2 ] (K3) P 5 U-036.5 A.4.1. 0.04 m3 Papan KayuM.107 1.10 2,300,000 92,000 2,539,200 Biaya 10-May-20 12-May-20 846,400 LT1 STR E - -
28 E05 [ 27,6 m2 / 3 har 27.6 m2 U-036 [ m2 ] (K3) P 6 U-036.6 A.4.1. 0.40 kg Paku Biasa 2M.111 11.04 25,000 10,000 276,000
Biaya Bahan 10-May-20 12-May-20 92,000 LT1 STR E - -
28 E05 [ 27,6 m2 / 3 har 27.6 m2 U-036 [ m2 ] (K3) P 7 U-036.7 A.4.1. 0.20 Ltr Minyak bekiM.141 5.52 45,750 9,150 252,540
Biaya Bahan 10-May-20 12-May-20 84,180 LT1 STR E - -
28 E05 [ 27,6 m2 / 3 har 27.6 m2 U-036 [ m2 ] (K3) P 8 U-036.8 A.4.1. 0.02 m3 Balok Kayu M.98 0.41 3,100,000 46,500 1,283,400
Biaya Bahan 10-May-20 12-May-20 427,800 LT1 STR E - -
28 E05 [ 27,6 m2 / 3 har 27.6 m2 U-036 [ m2 ] (K3) P 9 U-036.9 A.4.1. 0.35 Lbr Plywood 120M.60 9.66 175,000 61,250 1,690,500
Biaya Bahan 10-May-20 12-May-20 563,500 LT1 STR E - -
28 E05 [ 27,6 m2 / 3 har 27.6 m2 U-036 [ m2 ] (K3) P 10 U-036.10 A.4.1. 2.00 btg Dolken kayuM.104 55.20 25,000 50,000 1,380,000
Biaya Bahan 10-May-20 12-May-20 460,000 LT1 STR E - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

8 29 E06 [ 1,1 m3 / 1 hari 1.035 m3 U-027 [ m3 ] Membua 1 U-027.1 A.4.1. 1.65 OH Pekerja ( O L.1 1.71 85,000 140,250 145,159 Biaya 975,620 10-May-20 10-May-20 145,159 LT1 STR E 3 1.0 5
29 E06 [ 1,1 m3 / 1 hari 1.035 m3 U-027 [ m3 ] Membua 2 U-027.2 A.4.1. 0.28 OH Tukang Bat L.3 0.28 100,000 27,500 28,463 Biaya 10-May-20 10-May-20 28,463 LT1 STR E 1 2
29 E06 [ 1,1 m3 / 1 hari 1.035 m3 U-027 [ m3 ] Membua 3 U-027.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.03 150,000 4,200 4,347 Biaya 10-May-20 10-May-20 4,347 LT1 STR E 1 2
29 E06 [ 1,1 m3 / 1 hari 1.035 m3 U-027 [ m3 ] Membua 4 U-027.4 A.4.1. 0.08 OH Mandor ( O L.10 0.09 185,000 15,355 15,892 Biaya 10-May-20 10-May-20 15,892 LT1 STR E 1 1
29 E06 [ 1,1 m3 / 1 hari 1.035 m3 U-027 [ m3 ] Membua 5 U-027.5 A.4.1. 371.00 kg Semen ( kg M.12 383.99 1,300 482,300 499,181 Biaya 10-May-20 10-May-20 499,181 LT1 STR E - -
29 E06 [ 1,1 m3 / 1 hari 1.035 m3 U-027 [ m3 ] Membua 6 U-027.6 A.4.1. 0.50 m3 Pasir Beton M.8 0.52 250,000 124,643 129,005
Biaya Bahan 10-May-20 10-May-20 129,005 LT1 STR E - -
29 E06 [ 1,1 m3 / 1 hari 1.035 m3 U-027 [ m3 ] Membua 7 U-027.7 A.4.1. 0.78 m3 Kerikil ( m3 M.7 0.80 220,000 170,622 176,594
Biaya Bahan 10-May-20 10-May-20 176,594 LT1 STR E - -
29 E06 [ 1,1 m3 / 1 hari 1.035 m3 U-027 [ m3 ] Membua 8 U-027.8 A.4.1. 215.00 Ltr Air ( Ltr ) M.1 222.53 50 10,750 11,126
Biaya Bahan 10-May-20 10-May-20 11,126 LT1 STR E - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
6 30 E07 [ 494,8 kg / 1 h 494.72 kg U-033 [ kg ] Pembesia 1 U-033.1 A.4.1. 0.01 OH Pekerja ( O L.1 3.46 85,000 595 294,357 Biaya 12,327 19-Jun-20 19-Jun-20 294,357 LT2 STR E 3 1.0 5
30 E07 [ 494,8 kg / 1 h 494.72 kg U-033 [ kg ] Pembesia 2 U-033.2 A.4.1. 0.01 OH Tukang Bes L.4 3.46 100,000 700 346,303 Biaya 19-Jun-20 19-Jun-20 346,303 LT2 STR E 1 2
30 E07 [ 494,8 kg / 1 h 494.72 kg U-033 [ kg ] Pembesia 3 U-033.3 A.4.1. 0.00 OH Kepala Tuk L.9 0.35 150,000 105 51,945 Biaya 19-Jun-20 19-Jun-20 51,945 LT2 STR E 1 2
30 E07 [ 494,8 kg / 1 h 494.72 kg U-033 [ kg ] Pembesia 4 U-033.4 A.4.1. 0.00 OH Mandor ( O L.10 0.20 185,000 74 36,609 Biaya 19-Jun-20 19-Jun-20 36,609 LT2 STR E 1 1
30 E07 [ 494,8 kg / 1 h 494.72 kg U-033 [ kg ] Pembesia 5 U-033.5 A.4.1. 1.05 kg Besi beton ( M.16 519.45 10,000 10,500 5,194,541 Biaya 19-Jun-20 19-Jun-20 5,194,541 LT2 STR E - -
30 E07 [ 494,8 kg / 1 h 494.72 kg U-033 [ kg ] Pembesia 6 U-033.6 A.4.1. 0.02 kg Kawat betonM.27 7.42 23,500 353 174,388
Biaya Bahan 19-Jun-20 19-Jun-20 174,388 LT2 STR E - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

### 31 E08 [ 45,6 m2 / 5 har 45.6 m2 U-036 [ m2 ] (K3) P 1 U-036.1 A.4.1. 0.66 OH Pekerja ( O L.1 30.10 85,000 56,100 2,558,160 Biaya 369,055 19-Jun-20 23-Jun-20 511,632 LT2 STR E 3 5.0 5
31 E08 [ 45,6 m2 / 5 har 45.6 m2 U-036 [ m2 ] (K3) P 2 U-036.2 A.4.1. 0.33 OH Tukang Kay L.6 15.05 100,000 33,000 1,504,800 Biaya 19-Jun-20 23-Jun-20 300,960 LT2 STR E 1 2
31 E08 [ 45,6 m2 / 5 har 45.6 m2 U-036 [ m2 ] (K3) P 3 U-036.3 A.4.1. 0.03 OH Kepala Tuk L.9 1.50 150,000 4,950 225,720 Biaya 19-Jun-20 23-Jun-20 45,144 LT2 STR E 1 2
31 E08 [ 45,6 m2 / 5 har 45.6 m2 U-036 [ m2 ] (K3) P 4 U-036.4 A.4.1. 0.03 OH Mandor ( O L.10 1.50 185,000 6,105 278,388 Biaya 19-Jun-20 23-Jun-20 55,678 LT2 STR E 1 1
31 E08 [ 45,6 m2 / 5 har 45.6 m2 U-036 [ m2 ] (K3) P 5 U-036.5 A.4.1. 0.04 m3 Papan KayuM.107 1.82 2,300,000 92,000 4,195,200 Biaya 19-Jun-20 23-Jun-20 839,040 LT2 STR E - -
31 E08 [ 45,6 m2 / 5 har 45.6 m2 U-036 [ m2 ] (K3) P 6 U-036.6 A.4.1. 0.40 kg Paku Biasa 2M.111 18.24 25,000 10,000 456,000
Biaya Bahan 19-Jun-20 23-Jun-20 91,200 LT2 STR E - -
31 E08 [ 45,6 m2 / 5 har 45.6 m2 U-036 [ m2 ] (K3) P 7 U-036.7 A.4.1. 0.20 Ltr Minyak bekiM.141 9.12 45,750 9,150 417,240
Biaya Bahan 19-Jun-20 23-Jun-20 83,448 LT2 STR E - -
31 E08 [ 45,6 m2 / 5 har 45.6 m2 U-036 [ m2 ] (K3) P 8 U-036.8 A.4.1. 0.02 m3 Balok Kayu M.98 0.68 3,100,000 46,500 2,120,400
Biaya Bahan 19-Jun-20 23-Jun-20 424,080 LT2 STR E - -
31 E08 [ 45,6 m2 / 5 har 45.6 m2 U-036 [ m2 ] (K3) P 9 U-036.9 A.4.1. 0.35 Lbr Plywood 120M.60 15.96 175,000 61,250 2,793,000
Biaya Bahan 19-Jun-20 23-Jun-20 558,600 LT2 STR E - -
31 E08 [ 45,6 m2 / 5 har 45.6 m2 U-036 [ m2 ] (K3) P 10 U-036.10 A.4.1. 2.00 btg Dolken kayuM.104 91.20 25,000 50,000 2,280,000
Biaya Bahan 19-Jun-20 23-Jun-20 456,000 LT2 STR E - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

8 32 E09 [ 3,5 m3 / 1 hari 3.42 m3 U-027 [ m3 ] Membua 1 U-027.1 A.4.1. 1.65 OH Pekerja ( O L.1 5.64 85,000 140,250 479,655 Biaya 975,620 23-Jun-20 23-Jun-20 479,655 LT2 STR E 3 1.0 5
32 E09 [ 3,5 m3 / 1 hari 3.42 m3 U-027 [ m3 ] Membua 2 U-027.2 A.4.1. 0.28 OH Tukang Bat L.3 0.94 100,000 27,500 94,050 Biaya 23-Jun-20 23-Jun-20 94,050 LT2 STR E 1 2
32 E09 [ 3,5 m3 / 1 hari 3.42 m3 U-027 [ m3 ] Membua 3 U-027.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.10 150,000 4,200 14,364 Biaya 23-Jun-20 23-Jun-20 14,364 LT2 STR E 1 2
32 E09 [ 3,5 m3 / 1 hari 3.42 m3 U-027 [ m3 ] Membua 4 U-027.4 A.4.1. 0.08 OH Mandor ( O L.10 0.28 185,000 15,355 52,514 Biaya 23-Jun-20 23-Jun-20 52,514 LT2 STR E 1 1
32 E09 [ 3,5 m3 / 1 hari 3.42 m3 U-027 [ m3 ] Membua 5 U-027.5 A.4.1. 371.00 kg Semen ( kg M.12 1268.82 1,300 482,300 1,649,466 Biaya 23-Jun-20 23-Jun-20 1,649,466 LT2 STR E - -
32 E09 [ 3,5 m3 / 1 hari 3.42 m3 U-027 [ m3 ] Membua 6 U-027.6 A.4.1. 0.50 m3 Pasir Beton M.8 1.71 250,000 124,643 426,279
Biaya Bahan 23-Jun-20 23-Jun-20 426,279 LT2 STR E - -
32 E09 [ 3,5 m3 / 1 hari 3.42 m3 U-027 [ m3 ] Membua 7 U-027.7 A.4.1. 0.78 m3 Kerikil ( m3 M.7 2.65 220,000 170,622 583,528
Biaya Bahan 23-Jun-20 23-Jun-20 583,528 LT2 STR E - -
32 E09 [ 3,5 m3 / 1 hari 3.42 m3 U-027 [ m3 ] Membua 8 U-027.8 A.4.1. 215.00 Ltr Air ( Ltr ) M.1 735.30 50 10,750 36,765
Biaya Bahan 23-Jun-20 23-Jun-20 36,765 LT2 STR E - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 33 E10 [ 132,4 kg / 1 h 132.33 kg U-033 [ kg ] Pembesia 1 U-033.1 A.4.1. 0.01 OH Pekerja ( O L.1 0.93 85,000 595 78,738 Biaya 12,327 19-Jun-20 19-Jun-20 78,738 LT2 STR E 3 1.0 5
33 E10 [ 132,4 kg / 1 h 132.33 kg U-033 [ kg ] Pembesia 2 U-033.2 A.4.1. 0.01 OH Tukang Bes L.4 0.93 100,000 700 92,633 Biaya 19-Jun-20 19-Jun-20 92,633 LT2 STR E 1 2
33 E10 [ 132,4 kg / 1 h 132.33 kg U-033 [ kg ] Pembesia 3 U-033.3 A.4.1. 0.00 OH Kepala Tuk L.9 0.09 150,000 105 13,895 Biaya 19-Jun-20 19-Jun-20 13,895 LT2 STR E 1 2
33 E10 [ 132,4 kg / 1 h 132.33 kg U-033 [ kg ] Pembesia 4 U-033.4 A.4.1. 0.00 OH Mandor ( O L.10 0.05 185,000 74 9,793 Biaya 19-Jun-20 19-Jun-20 9,793 LT2 STR E 1 1
33 E10 [ 132,4 kg / 1 h 132.33 kg U-033 [ kg ] Pembesia 5 U-033.5 A.4.1. 1.05 kg Besi beton ( M.16 138.95 10,000 10,500 1,389,499 Biaya 19-Jun-20 19-Jun-20 1,389,499 LT2 STR E - -
33 E10 [ 132,4 kg / 1 h 132.33 kg U-033 [ kg ] Pembesia 6 U-033.6 A.4.1. 0.02 kg Kawat betonM.27 1.98 23,500 353 46,647
Biaya Bahan 19-Jun-20 19-Jun-20 46,647 LT2 STR E - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

### 34 E11 [ 19,2 m2 / 3 har 19.2 m2 U-036 [ m2 ] (K3) P 1 U-036.1 A.4.1. 0.66 OH Pekerja ( O L.1 12.67 85,000 56,100 1,077,120 Biaya 369,055 23-Jun-20 25-Jun-20 359,040 LT2 STR E 3 3.0 5
34 E11 [ 19,2 m2 / 3 har 19.2 m2 U-036 [ m2 ] (K3) P 2 U-036.2 A.4.1. 0.33 OH Tukang Kay L.6 6.34 100,000 33,000 633,600 Biaya 23-Jun-20 25-Jun-20 211,200 LT2 STR E 1 2
34 E11 [ 19,2 m2 / 3 har 19.2 m2 U-036 [ m2 ] (K3) P 3 U-036.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.63 150,000 4,950 95,040 Biaya 23-Jun-20 25-Jun-20 31,680 LT2 STR E 1 2
34 E11 [ 19,2 m2 / 3 har 19.2 m2 U-036 [ m2 ] (K3) P 4 U-036.4 A.4.1. 0.03 OH Mandor ( O L.10 0.63 185,000 6,105 117,216 Biaya 23-Jun-20 25-Jun-20 39,072 LT2 STR E 1 1
34 E11 [ 19,2 m2 / 3 har 19.2 m2 U-036 [ m2 ] (K3) P 5 U-036.5 A.4.1. 0.04 m3 Papan KayuM.107 0.77 2,300,000 92,000 1,766,400 Biaya 23-Jun-20 25-Jun-20 588,800 LT2 STR E - -
34 E11 [ 19,2 m2 / 3 har 19.2 m2 U-036 [ m2 ] (K3) P 6 U-036.6 A.4.1. 0.40 kg Paku Biasa 2M.111 7.68 25,000 10,000 192,000
Biaya Bahan 23-Jun-20 25-Jun-20 64,000 LT2 STR E - -
34 E11 [ 19,2 m2 / 3 har 19.2 m2 U-036 [ m2 ] (K3) P 7 U-036.7 A.4.1. 0.20 Ltr Minyak bekiM.141 3.84 45,750 9,150 175,680
Biaya Bahan 23-Jun-20 25-Jun-20 58,560 LT2 STR E - -
34 E11 [ 19,2 m2 / 3 har 19.2 m2 U-036 [ m2 ] (K3) P 8 U-036.8 A.4.1. 0.02 m3 Balok Kayu M.98 0.29 3,100,000 46,500 892,800
Biaya Bahan 23-Jun-20 25-Jun-20 297,600 LT2 STR E - -
34 E11 [ 19,2 m2 / 3 har 19.2 m2 U-036 [ m2 ] (K3) P 9 U-036.9 A.4.1. 0.35 Lbr Plywood 120M.60 6.72 175,000 61,250 1,176,000
Biaya Bahan 23-Jun-20 25-Jun-20 392,000 LT2 STR E - -
34 E11 [ 19,2 m2 / 3 har 19.2 m2 U-036 [ m2 ] (K3) P 10 U-036.10 A.4.1. 2.00 btg Dolken kayuM.104 38.40 25,000 50,000 960,000
Biaya Bahan 23-Jun-20 25-Jun-20 320,000 LT2 STR E - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

8 35 E12 [ 0,8 m3 / 1 hari 0.72 m3 U-027 [ m3 ] Membua 1 U-027.1 A.4.1. 1.65 OH Pekerja ( O L.1 1.19 85,000 140,250 100,980 Biaya 975,620 23-Jun-20 23-Jun-20 100,980 LT2 STR E 3 1.0 5
35 E12 [ 0,8 m3 / 1 hari 0.72 m3 U-027 [ m3 ] Membua 2 U-027.2 A.4.1. 0.28 OH Tukang Bat L.3 0.20 100,000 27,500 19,800 Biaya 23-Jun-20 23-Jun-20 19,800 LT2 STR E 1 2
35 E12 [ 0,8 m3 / 1 hari 0.72 m3 U-027 [ m3 ] Membua 3 U-027.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.02 150,000 4,200 3,024 Biaya 23-Jun-20 23-Jun-20 3,024 LT2 STR E 1 2
35 E12 [ 0,8 m3 / 1 hari 0.72 m3 U-027 [ m3 ] Membua 4 U-027.4 A.4.1. 0.08 OH Mandor ( O L.10 0.06 185,000 15,355 11,056 Biaya 23-Jun-20 23-Jun-20 11,056 LT2 STR E 1 1
35 E12 [ 0,8 m3 / 1 hari 0.72 m3 U-027 [ m3 ] Membua 5 U-027.5 A.4.1. 371.00 kg Semen ( kg M.12 267.12 1,300 482,300 347,256 Biaya 23-Jun-20 23-Jun-20 347,256 LT2 STR E - -
35 E12 [ 0,8 m3 / 1 hari 0.72 m3 U-027 [ m3 ] Membua 6 U-027.6 A.4.1. 0.50 m3 Pasir Beton M.8 0.36 250,000 124,643 89,743
Biaya Bahan 23-Jun-20 23-Jun-20 89,743 LT2 STR E - -
35 E12 [ 0,8 m3 / 1 hari 0.72 m3 U-027 [ m3 ] Membua 7 U-027.7 A.4.1. 0.78 m3 Kerikil ( m3 M.7 0.56 220,000 170,622 122,848
Biaya Bahan 23-Jun-20 23-Jun-20 122,848 LT2 STR E - -
35 E12 [ 0,8 m3 / 1 hari 0.72 m3 U-027 [ m3 ] Membua 8 U-027.8 A.4.1. 215.00 Ltr Air ( Ltr ) M.1 154.80 50 10,750 7,740
Biaya Bahan 23-Jun-20 23-Jun-20 7,740 LT2 STR E - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 36 F01 [ 814,1 kg / 2 h 814.06 kg U-033 [ kg ] Pembesia 1 U-033.1 A.4.1. 0.01 OH Pekerja ( O L.1 5.70 85,000 595 484,368 Biaya 12,327 11-May-20 12-May-20 242,184 LT1 STR F 3 2.0 5
36 F01 [ 814,1 kg / 2 h 814.06 kg U-033 [ kg ] Pembesia 2 U-033.2 A.4.1. 0.01 OH Tukang Bes L.4 5.70 100,000 700 569,845 Biaya 11-May-20 12-May-20 284,922 LT1 STR F 1 2
36 F01 [ 814,1 kg / 2 h 814.06 kg U-033 [ kg ] Pembesia 3 U-033.3 A.4.1. 0.00 OH Kepala Tuk L.9 0.57 150,000 105 85,477 Biaya 11-May-20 12-May-20 42,738 LT1 STR F 1 2
36 F01 [ 814,1 kg / 2 h 814.06 kg U-033 [ kg ] Pembesia 4 U-033.4 A.4.1. 0.00 OH Mandor ( O L.10 0.33 185,000 74 60,241 Biaya 11-May-20 12-May-20 30,120 LT1 STR F 1 1
36 F01 [ 814,1 kg / 2 h 814.06 kg U-033 [ kg ] Pembesia 5 U-033.5 A.4.1. 1.05 kg Besi beton ( M.16 854.77 10,000 10,500 8,547,668 Biaya 11-May-20 12-May-20 4,273,834 LT1 STR F - -
36 F01 [ 814,1 kg / 2 h 814.06 kg U-033 [ kg ] Pembesia 6 U-033.6 A.4.1. 0.02 kg Kawat betonM.27 12.21 23,500 353 286,957
Biaya Bahan 11-May-20 12-May-20 143,479 LT1 STR F - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

### 37 F02 [ 44,8 m2 / 5 har 44.8 m2 U-037 [ m2 ] (K3) Pe 1 U-037.1 A.4.1. 0.66 OH Pekerja ( O L.1 29.57 85,000 56,100 2,513,280 Biaya 378,355 12-May-20 16-May-20 502,656 LT1 STR F 3 5.0 5
37 F02 [ 44,8 m2 / 5 har 44.8 m2 U-037 [ m2 ] (K3) Pe 2 U-037.2 A.4.1. 0.33 OH Tukang Kay L.6 14.78 100,000 33,000 1,478,400 Biaya 12-May-20 16-May-20 295,680 LT1 STR F 1 2
37 F02 [ 44,8 m2 / 5 har 44.8 m2 U-037 [ m2 ] (K3) Pe 3 U-037.3 A.4.1. 0.03 OH Kepala Tuk L.9 1.48 150,000 4,950 221,760 Biaya 12-May-20 16-May-20 44,352 LT1 STR F 1 2
37 F02 [ 44,8 m2 / 5 har 44.8 m2 U-037 [ m2 ] (K3) Pe 4 U-037.4 A.4.1. 0.03 OH Mandor ( O L.10 1.48 185,000 6,105 273,504 Biaya 12-May-20 16-May-20 54,701 LT1 STR F 1 1
37 F02 [ 44,8 m2 / 5 har 44.8 m2 U-037 [ m2 ] (K3) Pe 5 U-037.5 A.4.1. 0.04 m3 Papan KayuM.107 1.79 2,300,000 92,000 4,121,600 Biaya 12-May-20 16-May-20 824,320 LT1 STR F - -
37 F02 [ 44,8 m2 / 5 har 44.8 m2 U-037 [ m2 ] (K3) Pe 6 U-037.6 A.4.1. 0.40 kg Paku Biasa 2M.111 17.92 25,000 10,000 448,000
Biaya Bahan 12-May-20 16-May-20 89,600 LT1 STR F - -
37 F02 [ 44,8 m2 / 5 har 44.8 m2 U-037 [ m2 ] (K3) Pe 7 U-037.7 A.4.1. 0.20 Ltr Minyak bekiM.141 8.96 45,750 9,150 409,920
Biaya Bahan 12-May-20 16-May-20 81,984 LT1 STR F - -
37 F02 [ 44,8 m2 / 5 har 44.8 m2 U-037 [ m2 ] (K3) Pe 8 U-037.8 A.4.1. 0.02 m3 Balok Kayu M.98 0.81 3,100,000 55,800 2,499,840
Biaya Bahan 12-May-20 16-May-20 499,968 LT1 STR F - -
37 F02 [ 44,8 m2 / 5 har 44.8 m2 U-037 [ m2 ] (K3) Pe 9 U-037.9 A.4.1. 0.35 Lbr Plywood 120M.60 15.68 175,000 61,250 2,744,000
Biaya Bahan 12-May-20 16-May-20 548,800 LT1 STR F - -
37 F02 [ 44,8 m2 / 5 har 44.8 m2 U-037 [ m2 ] (K3) Pe 10 U-037.10 A.4.1. 2.00 btg Dolken kayuM.104 89.60 25,000 50,000 2,240,000
Biaya Bahan 12-May-20 16-May-20 448,000 LT1 STR F - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

8 38 F03 [ 4,5 m3 / 1 hari 4.48 m3 U-027 [ m3 ] Membua 1 U-027.1 A.4.1. 1.65 OH Pekerja ( O L.1 7.39 85,000 140,250 628,320 Biaya 975,620 16-May-20 16-May-20 628,320 LT1 STR F 3 1.0 5
38 F03 [ 4,5 m3 / 1 hari 4.48 m3 U-027 [ m3 ] Membua 2 U-027.2 A.4.1. 0.28 OH Tukang Bat L.3 1.23 100,000 27,500 123,200 Biaya 16-May-20 16-May-20 123,200 LT1 STR F 1 2
38 F03 [ 4,5 m3 / 1 hari 4.48 m3 U-027 [ m3 ] Membua 3 U-027.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.13 150,000 4,200 18,816 Biaya 16-May-20 16-May-20 18,816 LT1 STR F 1 2
38 F03 [ 4,5 m3 / 1 hari 4.48 m3 U-027 [ m3 ] Membua 4 U-027.4 A.4.1. 0.08 OH Mandor ( O L.10 0.37 185,000 15,355 68,790 Biaya 16-May-20 16-May-20 68,790 LT1 STR F 1 1
38 F03 [ 4,5 m3 / 1 hari 4.48 m3 U-027 [ m3 ] Membua 5 U-027.5 A.4.1. 371.00 kg Semen ( kg M.12 1662.08 1,300 482,300 2,160,704 Biaya 16-May-20 16-May-20 2,160,704 LT1 STR F - -
38 F03 [ 4,5 m3 / 1 hari 4.48 m3 U-027 [ m3 ] Membua 6 U-027.6 A.4.1. 0.50 m3 Pasir Beton M.8 2.23 250,000 124,643 558,400
Biaya Bahan 16-May-20 16-May-20 558,400 LT1 STR F - -
38 F03 [ 4,5 m3 / 1 hari 4.48 m3 U-027 [ m3 ] Membua 7 U-027.7 A.4.1. 0.78 m3 Kerikil ( m3 M.7 3.47 220,000 170,622 764,388
Biaya Bahan 16-May-20 16-May-20 764,388 LT1 STR F - -
38 F03 [ 4,5 m3 / 1 hari 4.48 m3 U-027 [ m3 ] Membua 8 U-027.8 A.4.1. 215.00 Ltr Air ( Ltr ) M.1 963.20 50 10,750 48,160
Biaya Bahan 16-May-20 16-May-20 48,160 LT1 STR F - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 39 F04 [ 136,3 kg / 1 h 136.26 kg U-033 [ kg ] Pembesia 1 U-033.1 A.4.1. 0.01 OH Pekerja ( O L.1 0.95 85,000 595 81,076 Biaya 12,327 12-May-20 12-May-20 81,076 LT1 STR F 3 1.0 5
39 F04 [ 136,3 kg / 1 h 136.26 kg U-033 [ kg ] Pembesia 2 U-033.2 A.4.1. 0.01 OH Tukang Bes L.4 0.95 100,000 700 95,383 Biaya 12-May-20 12-May-20 95,383 LT1 STR F 1 2
39 F04 [ 136,3 kg / 1 h 136.26 kg U-033 [ kg ] Pembesia 3 U-033.3 A.4.1. 0.00 OH Kepala Tuk L.9 0.10 150,000 105 14,307 Biaya 12-May-20 12-May-20 14,307 LT1 STR F 1 2
39 F04 [ 136,3 kg / 1 h 136.26 kg U-033 [ kg ] Pembesia 4 U-033.4 A.4.1. 0.00 OH Mandor ( O L.10 0.05 185,000 74 10,083 Biaya 12-May-20 12-May-20 10,083 LT1 STR F 1 1
39 F04 [ 136,3 kg / 1 h 136.26 kg U-033 [ kg ] Pembesia 5 U-033.5 A.4.1. 1.05 kg Besi beton ( M.16 143.07 10,000 10,500 1,430,750 Biaya 12-May-20 12-May-20 1,430,750 LT1 STR F - -
39 F04 [ 136,3 kg / 1 h 136.26 kg U-033 [ kg ] Pembesia 6 U-033.6 A.4.1. 0.02 kg Kawat betonM.27 2.04 23,500 353 48,032
Biaya Bahan 12-May-20 12-May-20 48,032 LT1 STR F - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

### 40 F05 [ 12,8 m2 / 2 har 12.8 m2 U-037 [ m2 ] (K3) Pe 1 U-037.1 A.4.1. 0.66 OH Pekerja ( O L.1 8.45 85,000 56,100 718,080 Biaya 378,355 16-May-20 17-May-20 359,040 LT1 STR F 3 2.0 5
40 F05 [ 12,8 m2 / 2 har 12.8 m2 U-037 [ m2 ] (K3) Pe 2 U-037.2 A.4.1. 0.33 OH Tukang Kay L.6 4.22 100,000 33,000 422,400 Biaya 16-May-20 17-May-20 211,200 LT1 STR F 1 2
40 F05 [ 12,8 m2 / 2 har 12.8 m2 U-037 [ m2 ] (K3) Pe 3 U-037.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.42 150,000 4,950 63,360 Biaya 16-May-20 17-May-20 31,680 LT1 STR F 1 2
40 F05 [ 12,8 m2 / 2 har 12.8 m2 U-037 [ m2 ] (K3) Pe 4 U-037.4 A.4.1. 0.03 OH Mandor ( O L.10 0.42 185,000 6,105 78,144 Biaya 16-May-20 17-May-20 39,072 LT1 STR F 1 1
40 F05 [ 12,8 m2 / 2 har 12.8 m2 U-037 [ m2 ] (K3) Pe 5 U-037.5 A.4.1. 0.04 m3 Papan KayuM.107 0.51 2,300,000 92,000 1,177,600 Biaya 16-May-20 17-May-20 588,800 LT1 STR F - -
40 F05 [ 12,8 m2 / 2 har 12.8 m2 U-037 [ m2 ] (K3) Pe 6 U-037.6 A.4.1. 0.40 kg Paku Biasa 2M.111 5.12 25,000 10,000 128,000
Biaya Bahan 16-May-20 17-May-20 64,000 LT1 STR F - -
40 F05 [ 12,8 m2 / 2 har 12.8 m2 U-037 [ m2 ] (K3) Pe 7 U-037.7 A.4.1. 0.20 Ltr Minyak bekiM.141 2.56 45,750 9,150 117,120
Biaya Bahan 16-May-20 17-May-20 58,560 LT1 STR F - -
40 F05 [ 12,8 m2 / 2 har 12.8 m2 U-037 [ m2 ] (K3) Pe 8 U-037.8 A.4.1. 0.02 m3 Balok Kayu M.98 0.23 3,100,000 55,800 714,240
Biaya Bahan 16-May-20 17-May-20 357,120 LT1 STR F - -
40 F05 [ 12,8 m2 / 2 har 12.8 m2 U-037 [ m2 ] (K3) Pe 9 U-037.9 A.4.1. 0.35 Lbr Plywood 120M.60 4.48 175,000 61,250 784,000
Biaya Bahan 16-May-20 17-May-20 392,000 LT1 STR F - -
40 F05 [ 12,8 m2 / 2 har 12.8 m2 U-037 [ m2 ] (K3) Pe 10 U-037.10 A.4.1. 2.00 btg Dolken kayuM.104 25.60 25,000 50,000 640,000
Biaya Bahan 16-May-20 17-May-20 320,000 LT1 STR F - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

8 41 F06 [ 1 m3 / 1 hari ] 0.96 m3 U-027 [ m3 ] Membua 1 U-027.1 A.4.1. 1.65 OH Pekerja ( O L.1 1.58 85,000 140,250 134,640 Biaya 975,620 16-May-20 16-May-20 134,640 LT1 STR F 3 1.0 5
41 F06 [ 1 m3 / 1 hari ] 0.96 m3 U-027 [ m3 ] Membua 2 U-027.2 A.4.1. 0.28 OH Tukang Bat L.3 0.26 100,000 27,500 26,400 Biaya 16-May-20 16-May-20 26,400 LT1 STR F 1 2
41 F06 [ 1 m3 / 1 hari ] 0.96 m3 U-027 [ m3 ] Membua 3 U-027.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.03 150,000 4,200 4,032 Biaya 16-May-20 16-May-20 4,032 LT1 STR F 1 2
41 F06 [ 1 m3 / 1 hari ] 0.96 m3 U-027 [ m3 ] Membua 4 U-027.4 A.4.1. 0.08 OH Mandor ( O L.10 0.08 185,000 15,355 14,741 Biaya 16-May-20 16-May-20 14,741 LT1 STR F 1 1
41 F06 [ 1 m3 / 1 hari ] 0.96 m3 U-027 [ m3 ] Membua 5 U-027.5 A.4.1. 371.00 kg Semen ( kg M.12 356.16 1,300 482,300 463,008 Biaya 16-May-20 16-May-20 463,008 LT1 STR F - -
41 F06 [ 1 m3 / 1 hari ] 0.96 m3 U-027 [ m3 ] Membua 6 U-027.6 A.4.1. 0.50 m3 Pasir Beton M.8 0.48 250,000 124,643 119,657
Biaya Bahan 16-May-20 16-May-20 119,657 LT1 STR F - -
41 F06 [ 1 m3 / 1 hari ] 0.96 m3 U-027 [ m3 ] Membua 7 U-027.7 A.4.1. 0.78 m3 Kerikil ( m3 M.7 0.74 220,000 170,622 163,797
Biaya Bahan 16-May-20 16-May-20 163,797 LT1 STR F - -
41 F06 [ 1 m3 / 1 hari ] 0.96 m3 U-027 [ m3 ] Membua 8 U-027.8 A.4.1. 215.00 Ltr Air ( Ltr ) M.1 206.40 50 10,750 10,320
Biaya Bahan 16-May-20 16-May-20 10,320 LT1 STR F - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 42 F07 [ 506,9 kg / 1 h 506.89 kg U-033 [ kg ] Pembesia 1 U-033.1 A.4.1. 0.01 OH Pekerja ( O L.1 3.55 85,000 595 301,600 Biaya 12,327 24-Jun-20 24-Jun-20 301,600 LT2 STR F 3 1.0 5
42 F07 [ 506,9 kg / 1 h 506.89 kg U-033 [ kg ] Pembesia 2 U-033.2 A.4.1. 0.01 OH Tukang Bes L.4 3.55 100,000 700 354,823 Biaya 24-Jun-20 24-Jun-20 354,823 LT2 STR F 1 2
42 F07 [ 506,9 kg / 1 h 506.89 kg U-033 [ kg ] Pembesia 3 U-033.3 A.4.1. 0.00 OH Kepala Tuk L.9 0.35 150,000 105 53,223 Biaya 24-Jun-20 24-Jun-20 53,223 LT2 STR F 1 2
42 F07 [ 506,9 kg / 1 h 506.89 kg U-033 [ kg ] Pembesia 4 U-033.4 A.4.1. 0.00 OH Mandor ( O L.10 0.20 185,000 74 37,510 Biaya 24-Jun-20 24-Jun-20 37,510 LT2 STR F 1 1
42 F07 [ 506,9 kg / 1 h 506.89 kg U-033 [ kg ] Pembesia 5 U-033.5 A.4.1. 1.05 kg Besi beton ( M.16 532.23 10,000 10,500 5,322,346 Biaya 24-Jun-20 24-Jun-20 5,322,346 LT2 STR F - -
42 F07 [ 506,9 kg / 1 h 506.89 kg U-033 [ kg ] Pembesia 6 U-033.6 A.4.1. 0.02 kg Kawat betonM.27 7.60 23,500 353 178,679
Biaya Bahan 24-Jun-20 24-Jun-20 178,679 LT2 STR F - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

### 43 F08 [ 34,4 m2 / 4 har 34.4 m2 U-037 [ m2 ] (K3) Pe 1 U-037.1 A.4.1. 0.66 OH Pekerja ( O L.1 22.70 85,000 56,100 1,929,840 Biaya 378,355 25-Jun-20 28-Jun-20 482,460 LT2 STR F 3 4.0 5
43 F08 [ 34,4 m2 / 4 har 34.4 m2 U-037 [ m2 ] (K3) Pe 2 U-037.2 A.4.1. 0.33 OH Tukang Kay L.6 11.35 100,000 33,000 1,135,200 Biaya 25-Jun-20 28-Jun-20 283,800 LT2 STR F 1 2
43 F08 [ 34,4 m2 / 4 har 34.4 m2 U-037 [ m2 ] (K3) Pe 3 U-037.3 A.4.1. 0.03 OH Kepala Tuk L.9 1.14 150,000 4,950 170,280 Biaya 25-Jun-20 28-Jun-20 42,570 LT2 STR F 1 2
43 F08 [ 34,4 m2 / 4 har 34.4 m2 U-037 [ m2 ] (K3) Pe 4 U-037.4 A.4.1. 0.03 OH Mandor ( O L.10 1.14 185,000 6,105 210,012 Biaya 25-Jun-20 28-Jun-20 52,503 LT2 STR F 1 1
43 F08 [ 34,4 m2 / 4 har 34.4 m2 U-037 [ m2 ] (K3) Pe 5 U-037.5 A.4.1. 0.04 m3 Papan KayuM.107 1.38 2,300,000 92,000 3,164,800 Biaya 25-Jun-20 28-Jun-20 791,200 LT2 STR F - -
43 F08 [ 34,4 m2 / 4 har 34.4 m2 U-037 [ m2 ] (K3) Pe 6 U-037.6 A.4.1. 0.40 kg Paku Biasa 2M.111 13.76 25,000 10,000 344,000
Biaya Bahan 25-Jun-20 28-Jun-20 86,000 LT2 STR F - -
43 F08 [ 34,4 m2 / 4 har 34.4 m2 U-037 [ m2 ] (K3) Pe 7 U-037.7 A.4.1. 0.20 Ltr Minyak bekiM.141 6.88 45,750 9,150 314,760
Biaya Bahan 25-Jun-20 28-Jun-20 78,690 LT2 STR F - -
43 F08 [ 34,4 m2 / 4 har 34.4 m2 U-037 [ m2 ] (K3) Pe 8 U-037.8 A.4.1. 0.02 m3 Balok Kayu M.98 0.62 3,100,000 55,800 1,919,520
Biaya Bahan 25-Jun-20 28-Jun-20 479,880 LT2 STR F - -
43 F08 [ 34,4 m2 / 4 har 34.4 m2 U-037 [ m2 ] (K3) Pe 9 U-037.9 A.4.1. 0.35 Lbr Plywood 120M.60 12.04 175,000 61,250 2,107,000
Biaya Bahan 25-Jun-20 28-Jun-20 526,750 LT2 STR F - -
43 F08 [ 34,4 m2 / 4 har 34.4 m2 U-037 [ m2 ] (K3) Pe 10 U-037.10 A.4.1. 2.00 btg Dolken kayuM.104 68.80 25,000 50,000 1,720,000
Biaya Bahan 25-Jun-20 28-Jun-20 430,000 LT2 STR F - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

8 44 F09 [ 4,3 m3 / 1 hari 4.3 m3 U-027 [ m3 ] Membua 1 U-027.1 A.4.1. 1.65 OH Pekerja ( O L.1 7.10 85,000 140,250 603,075 Biaya 975,620 20-Jun-20 20-Jun-20 603,075 LT2 STR F 3 1.0 5
44 F09 [ 4,3 m3 / 1 hari 4.3 m3 U-027 [ m3 ] Membua 2 U-027.2 A.4.1. 0.28 OH Tukang Bat L.3 1.18 100,000 27,500 118,250 Biaya 20-Jun-20 20-Jun-20 118,250 LT2 STR F 1 2
44 F09 [ 4,3 m3 / 1 hari 4.3 m3 U-027 [ m3 ] Membua 3 U-027.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.12 150,000 4,200 18,060 Biaya 20-Jun-20 20-Jun-20 18,060 LT2 STR F 1 2
44 F09 [ 4,3 m3 / 1 hari 4.3 m3 U-027 [ m3 ] Membua 4 U-027.4 A.4.1. 0.08 OH Mandor ( O L.10 0.36 185,000 15,355 66,027 Biaya 20-Jun-20 20-Jun-20 66,027 LT2 STR F 1 1
44 F09 [ 4,3 m3 / 1 hari 4.3 m3 U-027 [ m3 ] Membua 5 U-027.5 A.4.1. 371.00 kg Semen ( kg M.12 1595.30 1,300 482,300 2,073,890 Biaya 20-Jun-20 20-Jun-20 2,073,890 LT2 STR F - -
44 F09 [ 4,3 m3 / 1 hari 4.3 m3 U-027 [ m3 ] Membua 6 U-027.6 A.4.1. 0.50 m3 Pasir Beton M.8 2.14 250,000 124,643 535,964
Biaya Bahan 20-Jun-20 20-Jun-20 535,964 LT2 STR F - -
44 F09 [ 4,3 m3 / 1 hari 4.3 m3 U-027 [ m3 ] Membua 7 U-027.7 A.4.1. 0.78 m3 Kerikil ( m3 M.7 3.33 220,000 170,622 733,676
Biaya Bahan 20-Jun-20 20-Jun-20 733,676 LT2 STR F - -
44 F09 [ 4,3 m3 / 1 hari 4.3 m3 U-027 [ m3 ] Membua 8 U-027.8 A.4.1. 215.00 Ltr Air ( Ltr ) M.1 924.50 50 10,750 46,225
Biaya Bahan 20-Jun-20 20-Jun-20 46,225 LT2 STR F - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 45 F10 [ 106,6 kg / 1 h 106.52 kg U-033 [ kg ] Pembesia 1 U-033.1 A.4.1. 0.01 OH Pekerja ( O L.1 0.75 85,000 595 63,381 Biaya 12,327 24-Jun-20 24-Jun-20 63,381 LT2 STR F 3 1.0 5
45 F10 [ 106,6 kg / 1 h 106.52 kg U-033 [ kg ] Pembesia 2 U-033.2 A.4.1. 0.01 OH Tukang Bes L.4 0.75 100,000 700 74,565 Biaya 24-Jun-20 24-Jun-20 74,565 LT2 STR F 1 2
45 F10 [ 106,6 kg / 1 h 106.52 kg U-033 [ kg ] Pembesia 3 U-033.3 A.4.1. 0.00 OH Kepala Tuk L.9 0.07 150,000 105 11,185 Biaya 24-Jun-20 24-Jun-20 11,185 LT2 STR F 1 2
45 F10 [ 106,6 kg / 1 h 106.52 kg U-033 [ kg ] Pembesia 4 U-033.4 A.4.1. 0.00 OH Mandor ( O L.10 0.04 185,000 74 7,883 Biaya 24-Jun-20 24-Jun-20 7,883 LT2 STR F 1 1
45 F10 [ 106,6 kg / 1 h 106.52 kg U-033 [ kg ] Pembesia 5 U-033.5 A.4.1. 1.05 kg Besi beton ( M.16 111.85 10,000 10,500 1,118,479 Biaya 24-Jun-20 24-Jun-20 1,118,479 LT2 STR F - -
45 F10 [ 106,6 kg / 1 h 106.52 kg U-033 [ kg ] Pembesia 6 U-033.6 A.4.1. 0.02 kg Kawat betonM.27 1.60 23,500 353 37,549
Biaya Bahan 24-Jun-20 24-Jun-20 37,549 LT2 STR F - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

### 46 F11 [ 10 m2 / 2 hari 10 m2 U-037 [ m2 ] (K3) Pe 1 U-037.1 A.4.1. 0.66 OH Pekerja ( O L.1 6.60 85,000 56,100 561,000 Biaya 378,355 28-Jun-20 29-Jun-20 280,500 LT2 STR F 3 2.0 5
46 F11 [ 10 m2 / 2 hari 10 m2 U-037 [ m2 ] (K3) Pe 2 U-037.2 A.4.1. 0.33 OH Tukang Kay L.6 3.30 100,000 33,000 330,000 Biaya 28-Jun-20 29-Jun-20 165,000 LT2 STR F 1 2
46 F11 [ 10 m2 / 2 hari 10 m2 U-037 [ m2 ] (K3) Pe 3 U-037.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.33 150,000 4,950 49,500 Biaya 28-Jun-20 29-Jun-20 24,750 LT2 STR F 1 2
46 F11 [ 10 m2 / 2 hari 10 m2 U-037 [ m2 ] (K3) Pe 4 U-037.4 A.4.1. 0.03 OH Mandor ( O L.10 0.33 185,000 6,105 61,050 Biaya 28-Jun-20 29-Jun-20 30,525 LT2 STR F 1 1
46 F11 [ 10 m2 / 2 hari 10 m2 U-037 [ m2 ] (K3) Pe 5 U-037.5 A.4.1. 0.04 m3 Papan KayuM.107 0.40 2,300,000 92,000 920,000 Biaya 28-Jun-20 29-Jun-20 460,000 LT2 STR F - -
46 F11 [ 10 m2 / 2 hari 10 m2 U-037 [ m2 ] (K3) Pe 6 U-037.6 A.4.1. 0.40 kg Paku Biasa 2M.111 4.00 25,000 10,000 100,000
Biaya Bahan 28-Jun-20 29-Jun-20 50,000 LT2 STR F - -
46 F11 [ 10 m2 / 2 hari 10 m2 U-037 [ m2 ] (K3) Pe 7 U-037.7 A.4.1. 0.20 Ltr Minyak bekiM.141 2.00 45,750 9,150 91,500
Biaya Bahan 28-Jun-20 29-Jun-20 45,750 LT2 STR F - -
46 F11 [ 10 m2 / 2 hari 10 m2 U-037 [ m2 ] (K3) Pe 8 U-037.8 A.4.1. 0.02 m3 Balok Kayu M.98 0.18 3,100,000 55,800 558,000
Biaya Bahan 28-Jun-20 29-Jun-20 279,000 LT2 STR F - -
46 F11 [ 10 m2 / 2 hari 10 m2 U-037 [ m2 ] (K3) Pe 9 U-037.9 A.4.1. 0.35 Lbr Plywood 120M.60 3.50 175,000 61,250 612,500
Biaya Bahan 28-Jun-20 29-Jun-20 306,250 LT2 STR F - -
46 F11 [ 10 m2 / 2 hari 10 m2 U-037 [ m2 ] (K3) Pe 10 U-037.10 A.4.1. 2.00 btg Dolken kayuM.104 20.00 25,000 50,000 500,000
Biaya Bahan 28-Jun-20 29-Jun-20 250,000 LT2 STR F - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

8 47 F12 [ 0,8 m3 / 1 hari 0.75 m3 U-027 [ m3 ] Membua 1 U-027.1 A.4.1. 1.65 OH Pekerja ( O L.1 1.24 85,000 140,250 105,188 Biaya 975,620 20-Jun-20 20-Jun-20 105,188 LT2 STR F 3 1.0 5
47 F12 [ 0,8 m3 / 1 hari 0.75 m3 U-027 [ m3 ] Membua 2 U-027.2 A.4.1. 0.28 OH Tukang Bat L.3 0.21 100,000 27,500 20,625 Biaya 20-Jun-20 20-Jun-20 20,625 LT2 STR F 1 2
47 F12 [ 0,8 m3 / 1 hari 0.75 m3 U-027 [ m3 ] Membua 3 U-027.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.02 150,000 4,200 3,150 Biaya 20-Jun-20 20-Jun-20 3,150 LT2 STR F 1 2
47 F12 [ 0,8 m3 / 1 hari 0.75 m3 U-027 [ m3 ] Membua 4 U-027.4 A.4.1. 0.08 OH Mandor ( O L.10 0.06 185,000 15,355 11,516 Biaya 20-Jun-20 20-Jun-20 11,516 LT2 STR F 1 1
47 F12 [ 0,8 m3 / 1 hari 0.75 m3 U-027 [ m3 ] Membua 5 U-027.5 A.4.1. 371.00 kg Semen ( kg M.12 278.25 1,300 482,300 361,725 Biaya 20-Jun-20 20-Jun-20 361,725 LT2 STR F - -
47 F12 [ 0,8 m3 / 1 hari 0.75 m3 U-027 [ m3 ] Membua 6 U-027.6 A.4.1. 0.50 m3 Pasir Beton M.8 0.37 250,000 124,643 93,482
Biaya Bahan 20-Jun-20 20-Jun-20 93,482 LT2 STR F - -
47 F12 [ 0,8 m3 / 1 hari 0.75 m3 U-027 [ m3 ] Membua 7 U-027.7 A.4.1. 0.78 m3 Kerikil ( m3 M.7 0.58 220,000 170,622 127,967
Biaya Bahan 20-Jun-20 20-Jun-20 127,967 LT2 STR F - -
47 F12 [ 0,8 m3 / 1 hari 0.75 m3 U-027 [ m3 ] Membua 8 U-027.8 A.4.1. 215.00 Ltr Air ( Ltr ) M.1 161.25 50 10,750 8,063
Biaya Bahan 20-Jun-20 20-Jun-20 8,063 LT2 STR F - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 48 G01 [ 1989,3 kg / 4 h 1989 kg U-033 [ kg ] Pembesia 1 U-033.1 A.4.1. 0.01 OH Pekerja ( O L.1 13.93 85,000 595 1,183,629 Biaya 12,327 14-May-20 17-May-20 295,907 LT2 STR G 3 4.0 5
48 G01 [ 1989,3 kg / 4 h 1989 kg U-033 [ kg ] Pembesia 2 U-033.2 A.4.1. 0.01 OH Tukang Bes L.4 13.93 100,000 700 1,392,505 Biaya 14-May-20 17-May-20 348,126 LT2 STR G 1 2
48 G01 [ 1989,3 kg / 4 h 1989 kg U-033 [ kg ] Pembesia 3 U-033.3 A.4.1. 0.00 OH Kepala Tuk L.9 1.39 150,000 105 208,876 Biaya 14-May-20 17-May-20 52,219 LT2 STR G 1 2
48 G01 [ 1989,3 kg / 4 h 1989 kg U-033 [ kg ] Pembesia 4 U-033.4 A.4.1. 0.00 OH Mandor ( O L.10 0.80 185,000 74 147,208 Biaya 14-May-20 17-May-20 36,802 LT2 STR G 1 1
48 G01 [ 1989,3 kg / 4 h 1989 kg U-033 [ kg ] Pembesia 5 U-033.5 A.4.1. 1.05 kg Besi beton ( M.16 2088.76 10,000 10,500 20,887,572 Biaya 14-May-20 17-May-20 5,221,893 LT2 STR G - -
48 G01 [ 1989,3 kg / 4 h 1989 kg U-033 [ kg ] Pembesia 6 U-033.6 A.4.1. 0.02 kg Kawat betonM.27 29.84 23,500 353 701,226
Biaya Bahan 14-May-20 17-May-20 175,306 LT2 STR G - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

### 49 G02 [ 90 m2 / 10 hari 90 m2 U-038 [ m2 ] (K3) Pe 1 U-038.1 A.4.1. 0.66 OH Pekerja ( O L.1 59.40 85,000 56,100 5,049,000 Biaya 469,055 17-May-20 26-May-20 504,900 LT2 STR G 3 10.0 5
49 G02 [ 90 m2 / 10 hari 90 m2 U-038 [ m2 ] (K3) Pe 2 U-038.2 A.4.1. 0.33 OH Tukang Kay L.6 29.70 100,000 33,000 2,970,000 Biaya 17-May-20 26-May-20 297,000 LT2 STR G 1 2
49 G02 [ 90 m2 / 10 hari 90 m2 U-038 [ m2 ] (K3) Pe 3 U-038.3 A.4.1. 0.03 OH Kepala Tuk L.9 2.97 150,000 4,950 445,500 Biaya 17-May-20 26-May-20 44,550 LT2 STR G 1 2
49 G02 [ 90 m2 / 10 hari 90 m2 U-038 [ m2 ] (K3) Pe 4 U-038.4 A.4.1. 0.03 OH Mandor ( O L.10 2.97 185,000 6,105 549,450 Biaya 17-May-20 26-May-20 54,945 LT2 STR G 1 1
49 G02 [ 90 m2 / 10 hari 90 m2 U-038 [ m2 ] (K3) Pe 5 U-038.5 A.4.1. 0.04 m3 Papan KayuM.107 3.60 2,300,000 92,000 8,280,000 Biaya 17-May-20 26-May-20 828,000 LT2 STR G - -
49 G02 [ 90 m2 / 10 hari 90 m2 U-038 [ m2 ] (K3) Pe 6 U-038.6 A.4.1. 0.40 kg Paku Biasa 2M.111 36.00 25,000 10,000 900,000
Biaya Bahan 17-May-20 26-May-20 90,000 LT2 STR G - -
49 G02 [ 90 m2 / 10 hari 90 m2 U-038 [ m2 ] (K3) Pe 7 U-038.7 A.4.1. 0.20 Ltr Minyak bekiM.141 18.00 45,750 9,150 823,500
Biaya Bahan 17-May-20 26-May-20 82,350 LT2 STR G - -
49 G02 [ 90 m2 / 10 hari 90 m2 U-038 [ m2 ] (K3) Pe 8 U-038.8 A.4.1. 0.02 m3 Balok Kayu M.98 1.35 3,100,000 46,500 4,185,000
Biaya Bahan 17-May-20 26-May-20 418,500 LT2 STR G - -
49 G02 [ 90 m2 / 10 hari 90 m2 U-038 [ m2 ] (K3) Pe 9 U-038.9 A.4.1. 0.35 Lbr Plywood 120M.60 31.50 175,000 61,250 5,512,500
Biaya Bahan 17-May-20 26-May-20 551,250 LT2 STR G - -
49 G02 [ 90 m2 / 10 hari 90 m2 U-038 [ m2 ] (K3) Pe 10 U-038.10 A.4.1. 6.00 btg Dolken kayuM.104 540.00 25,000 150,000 13,500,000
Biaya Bahan 17-May-20 26-May-20 1,350,000 LT2 STR G - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

8 50 G03 [ 11,7 m3 / 3 har 11.7 m3 U-027 [ m3 ] Membua 1 U-027.1 A.4.1. 1.65 OH Pekerja ( O L.1 19.31 85,000 140,250 1,640,925 Biaya 975,620 27-May-20 29-May-20 546,975 LT2 STR G 3 3.0 5
50 G03 [ 11,7 m3 / 3 har 11.7 m3 U-027 [ m3 ] Membua 2 U-027.2 A.4.1. 0.28 OH Tukang Bat L.3 3.22 100,000 27,500 321,750 Biaya 27-May-20 29-May-20 107,250 LT2 STR G 1 2
50 G03 [ 11,7 m3 / 3 har 11.7 m3 U-027 [ m3 ] Membua 3 U-027.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.33 150,000 4,200 49,140 Biaya 27-May-20 29-May-20 16,380 LT2 STR G 1 2
50 G03 [ 11,7 m3 / 3 har 11.7 m3 U-027 [ m3 ] Membua 4 U-027.4 A.4.1. 0.08 OH Mandor ( O L.10 0.97 185,000 15,355 179,654 Biaya 27-May-20 29-May-20 59,885 LT2 STR G 1 1
50 G03 [ 11,7 m3 / 3 har 11.7 m3 U-027 [ m3 ] Membua 5 U-027.5 A.4.1. 371.00 kg Semen ( kg M.12 4340.70 1,300 482,300 5,642,910 Biaya 27-May-20 29-May-20 1,880,970 LT2 STR G - -
50 G03 [ 11,7 m3 / 3 har 11.7 m3 U-027 [ m3 ] Membua 6 U-027.6 A.4.1. 0.50 m3 Pasir Beton M.8 5.83 250,000 124,643 1,458,321
Biaya Bahan 27-May-20 29-May-20 486,107 LT2 STR G - -
50 G03 [ 11,7 m3 / 3 har 11.7 m3 U-027 [ m3 ] Membua 7 U-027.7 A.4.1. 0.78 m3 Kerikil ( m3 M.7 9.07 220,000 170,622 1,996,280
Biaya Bahan 27-May-20 29-May-20 665,427 LT2 STR G - -
50 G03 [ 11,7 m3 / 3 har 11.7 m3 U-027 [ m3 ] Membua 8 U-027.8 A.4.1. 215.00 Ltr Air ( Ltr ) M.1 2515.50 50 10,750 125,775
Biaya Bahan 27-May-20 29-May-20 41,925 LT2 STR G - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 51 G04 [ 48,1 kg / 1 har 48.066 kg U-033 [ kg ] Pembesia 1 U-033.1 A.4.1. 0.01 OH Pekerja ( O L.1 0.34 85,000 595 28,599 Biaya 12,327 17-May-20 17-May-20 28,599 LT2 STR G 3 1.0 5
51 G04 [ 48,1 kg / 1 har 48.066 kg U-033 [ kg ] Pembesia 2 U-033.2 A.4.1. 0.01 OH Tukang Bes L.4 0.34 100,000 700 33,646 Biaya 17-May-20 17-May-20 33,646 LT2 STR G 1 2
51 G04 [ 48,1 kg / 1 har 48.066 kg U-033 [ kg ] Pembesia 3 U-033.3 A.4.1. 0.00 OH Kepala Tuk L.9 0.03 150,000 105 5,047 Biaya 17-May-20 17-May-20 5,047 LT2 STR G 1 2
51 G04 [ 48,1 kg / 1 har 48.066 kg U-033 [ kg ] Pembesia 4 U-033.4 A.4.1. 0.00 OH Mandor ( O L.10 0.02 185,000 74 3,557 Biaya 17-May-20 17-May-20 3,557 LT2 STR G 1 1
51 G04 [ 48,1 kg / 1 har 48.066 kg U-033 [ kg ] Pembesia 5 U-033.5 A.4.1. 1.05 kg Besi beton ( M.16 50.47 10,000 10,500 504,688 Biaya 17-May-20 17-May-20 504,688 LT2 STR G - -
51 G04 [ 48,1 kg / 1 har 48.066 kg U-033 [ kg ] Pembesia 6 U-033.6 A.4.1. 0.02 kg Kawat betonM.27 0.72 23,500 353 16,943
Biaya Bahan 17-May-20 17-May-20 16,943 LT2 STR G - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

### 52 G05 [ 6 m2 / 1 hari ] 6 m2 U-038 [ m2 ] (K3) Pe 1 U-038.1 A.4.1. 0.66 OH Pekerja ( O L.1 3.96 85,000 56,100 336,600 Biaya 469,055 26-May-20 26-May-20 336,600 LT2 STR G 3 1.0 5
52 G05 [ 6 m2 / 1 hari ] 6 m2 U-038 [ m2 ] (K3) Pe 2 U-038.2 A.4.1. 0.33 OH Tukang Kay L.6 1.98 100,000 33,000 198,000 Biaya 26-May-20 26-May-20 198,000 LT2 STR G 1 2
52 G05 [ 6 m2 / 1 hari ] 6 m2 U-038 [ m2 ] (K3) Pe 3 U-038.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.20 150,000 4,950 29,700 Biaya 26-May-20 26-May-20 29,700 LT2 STR G 1 2
52 G05 [ 6 m2 / 1 hari ] 6 m2 U-038 [ m2 ] (K3) Pe 4 U-038.4 A.4.1. 0.03 OH Mandor ( O L.10 0.20 185,000 6,105 36,630 Biaya 26-May-20 26-May-20 36,630 LT2 STR G 1 1
52 G05 [ 6 m2 / 1 hari ] 6 m2 U-038 [ m2 ] (K3) Pe 5 U-038.5 A.4.1. 0.04 m3 Papan KayuM.107 0.24 2,300,000 92,000 552,000 Biaya 26-May-20 26-May-20 552,000 LT2 STR G - -
52 G05 [ 6 m2 / 1 hari ] 6 m2 U-038 [ m2 ] (K3) Pe 6 U-038.6 A.4.1. 0.40 kg Paku Biasa 2M.111 2.40 25,000 10,000 60,000
Biaya Bahan 26-May-20 26-May-20 60,000 LT2 STR G - -
52 G05 [ 6 m2 / 1 hari ] 6 m2 U-038 [ m2 ] (K3) Pe 7 U-038.7 A.4.1. 0.20 Ltr Minyak bekiM.141 1.20 45,750 9,150 54,900
Biaya Bahan 26-May-20 26-May-20 54,900 LT2 STR G - -
52 G05 [ 6 m2 / 1 hari ] 6 m2 U-038 [ m2 ] (K3) Pe 8 U-038.8 A.4.1. 0.02 m3 Balok Kayu M.98 0.09 3,100,000 46,500 279,000
Biaya Bahan 26-May-20 26-May-20 279,000 LT2 STR G - -
52 G05 [ 6 m2 / 1 hari ] 6 m2 U-038 [ m2 ] (K3) Pe 9 U-038.9 A.4.1. 0.35 Lbr Plywood 120M.60 2.10 175,000 61,250 367,500
Biaya Bahan 26-May-20 26-May-20 367,500 LT2 STR G - -
52 G05 [ 6 m2 / 1 hari ] 6 m2 U-038 [ m2 ] (K3) Pe 10 U-038.10 A.4.1. 6.00 btg Dolken kayuM.104 36.00 25,000 150,000 900,000
Biaya Bahan 26-May-20 26-May-20 900,000 LT2 STR G - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

8 53 G06 [ 0,6 m3 / 1 hari 0.6 m3 U-027 [ m3 ] Membua 1 U-027.1 A.4.1. 1.65 OH Pekerja ( O L.1 0.99 85,000 140,250 84,150 Biaya 975,620 29-May-20 29-May-20 84,150 LT2 STR G 3 1.0 5
53 G06 [ 0,6 m3 / 1 hari 0.6 m3 U-027 [ m3 ] Membua 2 U-027.2 A.4.1. 0.28 OH Tukang Bat L.3 0.17 100,000 27,500 16,500 Biaya 29-May-20 29-May-20 16,500 LT2 STR G 1 2
53 G06 [ 0,6 m3 / 1 hari 0.6 m3 U-027 [ m3 ] Membua 3 U-027.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.02 150,000 4,200 2,520 Biaya 29-May-20 29-May-20 2,520 LT2 STR G 1 2
53 G06 [ 0,6 m3 / 1 hari 0.6 m3 U-027 [ m3 ] Membua 4 U-027.4 A.4.1. 0.08 OH Mandor ( O L.10 0.05 185,000 15,355 9,213 Biaya 29-May-20 29-May-20 9,213 LT2 STR G 1 1
53 G06 [ 0,6 m3 / 1 hari 0.6 m3 U-027 [ m3 ] Membua 5 U-027.5 A.4.1. 371.00 kg Semen ( kg M.12 222.60 1,300 482,300 289,380 Biaya 29-May-20 29-May-20 289,380 LT2 STR G - -
53 G06 [ 0,6 m3 / 1 hari 0.6 m3 U-027 [ m3 ] Membua 6 U-027.6 A.4.1. 0.50 m3 Pasir Beton M.8 0.30 250,000 124,643 74,786
Biaya Bahan 29-May-20 29-May-20 74,786 LT2 STR G - -
53 G06 [ 0,6 m3 / 1 hari 0.6 m3 U-027 [ m3 ] Membua 7 U-027.7 A.4.1. 0.78 m3 Kerikil ( m3 M.7 0.47 220,000 170,622 102,373
Biaya Bahan 29-May-20 29-May-20 102,373 LT2 STR G - -
53 G06 [ 0,6 m3 / 1 hari 0.6 m3 U-027 [ m3 ] Membua 8 U-027.8 A.4.1. 215.00 Ltr Air ( Ltr ) M.1 129.00 50 10,750 6,450
Biaya Bahan 29-May-20 29-May-20 6,450 LT2 STR G - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

7 54 H01 [ 146,3 m2 / 7 ha146.24 m2 U-016 [ m2 ] Pemasa 1 U-016.1 A.4.4. 0.30 OH Pekerja ( O L.1 43.87 85,000 25,500 3,729,120 Biaya 109,334 19-Jun-20 25-Jun-20 532,731 LT1 ARS H 3 7.0 5
54 H01 [ 146,3 m2 / 7 ha146.24 m2 U-016 [ m2 ] Pemasa 2 U-016.2 A.4.4. 0.10 OH Tukang Bat L.3 14.62 100,000 10,000 1,462,400 Biaya 19-Jun-20 25-Jun-20 208,914 LT1 ARS H 1 2
54 H01 [ 146,3 m2 / 7 ha146.24 m2 U-016 [ m2 ] Pemasa 3 U-016.3 A.4.4. 0.01 OH Kepala Tuk L.9 1.46 150,000 1,500 219,360 Biaya 19-Jun-20 25-Jun-20 31,337 LT1 ARS H 1 2
54 H01 [ 146,3 m2 / 7 ha146.24 m2 U-016 [ m2 ] Pemasa 4 U-016.4 A.4.4. 0.02 OH Mandor ( O L.10 2.19 185,000 2,775 405,816 Biaya 19-Jun-20 25-Jun-20 57,974 LT1 ARS H 1 1
54 H01 [ 146,3 m2 / 7 ha146.24 m2 U-016 [ m2 ] Pemasa 5 U-016.5 A.4.4. 70.00 bh Bata merah M.2 10236.80 650 45,500 6,653,920 Biaya 19-Jun-20 25-Jun-20 950,560 LT1 ARS H - -
54 H01 [ 146,3 m2 / 7 ha146.24 m2 U-016 [ m2 ] Pemasa 6 U-016.6 A.4.4. 9.68 Kg Semen ( Kg M.12 1415.60 1,300 12,584 1,840,284
Biaya Bahan 19-Jun-20 25-Jun-20 262,898 LT1 ARS H - -
54 H01 [ 146,3 m2 / 7 ha146.24 m2 U-016 [ m2 ] Pemasa 7 U-016.7 A.4.4. 0.05 m3 Pasir Pasan M.9 6.58 255,000 11,475 1,678,104
Biaya Bahan 19-Jun-20 25-Jun-20 239,729 LT1 ARS H - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

7 55 H02 [ 14,7 m2 / 1 ha 14.624 m2 U-015 [ m2 ] Pemasa 1 U-015.1 A.4.4. 0.30 OH Pekerja ( O L.1 4.39 85,000 25,500 372,912 Biaya 114,156 19-Jun-20 19-Jun-20 372,912 LT1 ARS H 3 1.0 5
55 H02 [ 14,7 m2 / 1 ha 14.624 m2 U-015 [ m2 ] Pemasa 2 U-015.2 A.4.4. 0.10 OH Tukang Bat L.3 1.46 100,000 10,000 146,240 Biaya 19-Jun-20 19-Jun-20 146,240 LT1 ARS H 1 2
55 H02 [ 14,7 m2 / 1 ha 14.624 m2 U-015 [ m2 ] Pemasa 3 U-015.3 A.4.4. 0.01 OH Kepala Tuk L.9 0.15 150,000 1,500 21,936 Biaya 19-Jun-20 19-Jun-20 21,936 LT1 ARS H 1 2
55 H02 [ 14,7 m2 / 1 ha 14.624 m2 U-015 [ m2 ] Pemasa 4 U-015.4 A.4.4. 0.02 OH Mandor ( O L.10 0.22 185,000 2,775 40,582 Biaya 19-Jun-20 19-Jun-20 40,582 LT1 ARS H 1 1
55 H02 [ 14,7 m2 / 1 ha 14.624 m2 U-015 [ m2 ] Pemasa 5 U-015.5 A.4.4. 70.00 bh Bata merah M.2 1023.68 650 45,500 665,392 Biaya 19-Jun-20 19-Jun-20 665,392 LT1 ARS H - -
55 H02 [ 14,7 m2 / 1 ha 14.624 m2 U-015 [ m2 ] Pemasa 6 U-015.6 A.4.4. 14.37 Kg Semen ( Kg M.12 210.15 1,300 18,681 273,191
Biaya Bahan 19-Jun-20 19-Jun-20 273,191 LT1 ARS H - -
55 H02 [ 14,7 m2 / 1 ha 14.624 m2 U-015 [ m2 ] Pemasa 7 U-015.7 A.4.4. 0.04 m3 Pasir Pasan M.9 0.58 255,000 10,200 149,165
Biaya Bahan 19-Jun-20 19-Jun-20 149,165 LT1 ARS H - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 56 H03 [ 292,5 m2 / 15 h292.48 m2 U-019 [ m2 ] Pemasan 1 U-019.1 A.4.4. 0.30 OH Pekerja ( O L.1 87.74 85,000 25,500 7,458,240 Biaya 58,894 19-Jun-20 03-Jul-20 497,216 LT1 ARS H 3 15.0 5
56 H03 [ 292,5 m2 / 15 h292.48 m2 U-019 [ m2 ] Pemasan 2 U-019.2 A.4.4. 0.15 OH Tukang Bat L.3 43.87 100,000 15,000 4,387,200 Biaya 19-Jun-20 03-Jul-20 292,480 LT1 ARS H 1 2
56 H03 [ 292,5 m2 / 15 h292.48 m2 U-019 [ m2 ] Pemasan 3 U-019.3 A.4.4. 0.02 OH Kepala Tuk L.9 4.39 150,000 2,250 658,080 Biaya 19-Jun-20 03-Jul-20 43,872 LT1 ARS H 1 2
56 H03 [ 292,5 m2 / 15 h292.48 m2 U-019 [ m2 ] Pemasan 4 U-019.4 A.4.4. 0.02 OH Mandor ( O L.10 4.39 185,000 2,775 811,632 Biaya 19-Jun-20 03-Jul-20 54,109 LT1 ARS H 1 1
56 H03 [ 292,5 m2 / 15 h292.48 m2 U-019 [ m2 ] Pemasan 5 U-019.5 A.4.4. 5.18 Kg Semen ( Kg M.12 1516.22 1,300 6,739 1,971,081 Biaya 19-Jun-20 03-Jul-20 131,405 LT1 ARS H - -
56 H03 [ 292,5 m2 / 15 h292.48 m2 U-019 [ m2 ] Pemasan 6 U-019.6 A.4.4. 0.03 m3 Pasir Pasan M.9 7.60 255,000 6,630 1,939,142
Biaya Bahan 19-Jun-20 03-Jul-20 129,276 LT1 ARS H - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

5 57 H04 [ 292,5 m2 / 10 h292.48 m2 U-020 [ m2 ] Pemasan 1 U-020.1 A.4.4. 0.20 OH Pekerja ( O L.1 58.50 85,000 17,000 4,972,160 Biaya 34,575 26-Jun-20 05-Jul-20 497,216 LT1 ARS H 3 10.0 5
57 H04 [ 292,5 m2 / 10 h292.48 m2 U-020 [ m2 ] Pemasan 2 U-020.2 A.4.4. 0.10 OH Tukang Bat L.3 29.25 100,000 10,000 2,924,800 Biaya 26-Jun-20 05-Jul-20 292,480 LT1 ARS H 1 2
57 H04 [ 292,5 m2 / 10 h292.48 m2 U-020 [ m2 ] Pemasan 3 U-020.3 A.4.4. 0.01 OH Kepala Tuk L.9 2.92 150,000 1,500 438,720 Biaya 26-Jun-20 05-Jul-20 43,872 LT1 ARS H 1 2
57 H04 [ 292,5 m2 / 10 h292.48 m2 U-020 [ m2 ] Pemasan 4 U-020.4 A.4.4. 0.01 OH Mandor ( O L.10 2.92 185,000 1,850 541,088 Biaya 26-Jun-20 05-Jul-20 54,109 LT1 ARS H 1 1
57 H04 [ 292,5 m2 / 10 h292.48 m2 U-020 [ m2 ] Pemasan 5 U-020.5 A.4.4. 3.25 Kg Semen ( Kg M.12 950.56 1,300 4,225 1,235,728 Biaya 26-Jun-20 05-Jul-20 123,573 LT1 ARS H - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

7 58 H05 [ 134 m2 / 6 hari 134 m2 U-016 [ m2 ] Pemasa 1 U-016.1 A.4.4. 0.30 OH Pekerja ( O L.1 40.20 85,000 25,500 3,417,000 Biaya 109,334 22-Jun-20 27-Jun-20 569,500 LT2 ARS H 3 6.0 5
58 H05 [ 134 m2 / 6 hari 134 m2 U-016 [ m2 ] Pemasa 2 U-016.2 A.4.4. 0.10 OH Tukang Bat L.3 13.40 100,000 10,000 1,340,000 Biaya 22-Jun-20 27-Jun-20 223,333 LT2 ARS H 1 2
58 H05 [ 134 m2 / 6 hari 134 m2 U-016 [ m2 ] Pemasa 3 U-016.3 A.4.4. 0.01 OH Kepala Tuk L.9 1.34 150,000 1,500 201,000 Biaya 22-Jun-20 27-Jun-20 33,500 LT2 ARS H 1 2
58 H05 [ 134 m2 / 6 hari 134 m2 U-016 [ m2 ] Pemasa 4 U-016.4 A.4.4. 0.02 OH Mandor ( O L.10 2.01 185,000 2,775 371,850 Biaya 22-Jun-20 27-Jun-20 61,975 LT2 ARS H 1 1
58 H05 [ 134 m2 / 6 hari 134 m2 U-016 [ m2 ] Pemasa 5 U-016.5 A.4.4. 70.00 bh Bata merah M.2 9380.00 650 45,500 6,097,000 Biaya 22-Jun-20 27-Jun-20 1,016,167 LT2 ARS H - -
58 H05 [ 134 m2 / 6 hari 134 m2 U-016 [ m2 ] Pemasa 6 U-016.6 A.4.4. 9.68 Kg Semen ( Kg M.12 1297.12 1,300 12,584 1,686,256
Biaya Bahan 22-Jun-20 27-Jun-20 281,043 LT2 ARS H - -
58 H05 [ 134 m2 / 6 hari 134 m2 U-016 [ m2 ] Pemasa 7 U-016.7 A.4.4. 0.05 m3 Pasir Pasan M.9 6.03 255,000 11,475 1,537,650
Biaya Bahan 22-Jun-20 27-Jun-20 256,275 LT2 ARS H - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
7 59 H06 [ 13,4 m2 / 1 ha 13.4 m2 U-015 [ m2 ] Pemasa 1 U-015.1 A.4.4. 0.30 OH Pekerja ( O L.1 4.02 85,000 25,500 341,700 Biaya 114,156 22-Jun-20 22-Jun-20 341,700 LT2 ARS H 3 1.0 5
59 H06 [ 13,4 m2 / 1 ha 13.4 m2 U-015 [ m2 ] Pemasa 2 U-015.2 A.4.4. 0.10 OH Tukang Bat L.3 1.34 100,000 10,000 134,000 Biaya 22-Jun-20 22-Jun-20 134,000 LT2 ARS H 1 2
59 H06 [ 13,4 m2 / 1 ha 13.4 m2 U-015 [ m2 ] Pemasa 3 U-015.3 A.4.4. 0.01 OH Kepala Tuk L.9 0.13 150,000 1,500 20,100 Biaya 22-Jun-20 22-Jun-20 20,100 LT2 ARS H 1 2
59 H06 [ 13,4 m2 / 1 ha 13.4 m2 U-015 [ m2 ] Pemasa 4 U-015.4 A.4.4. 0.02 OH Mandor ( O L.10 0.20 185,000 2,775 37,185 Biaya 22-Jun-20 22-Jun-20 37,185 LT2 ARS H 1 1
59 H06 [ 13,4 m2 / 1 ha 13.4 m2 U-015 [ m2 ] Pemasa 5 U-015.5 A.4.4. 70.00 bh Bata merah M.2 938.00 650 45,500 609,700 Biaya 22-Jun-20 22-Jun-20 609,700 LT2 ARS H - -
59 H06 [ 13,4 m2 / 1 ha 13.4 m2 U-015 [ m2 ] Pemasa 6 U-015.6 A.4.4. 14.37 Kg Semen ( Kg M.12 192.56 1,300 18,681 250,325
Biaya Bahan 22-Jun-20 22-Jun-20 250,325 LT2 ARS H - -
59 H06 [ 13,4 m2 / 1 ha 13.4 m2 U-015 [ m2 ] Pemasa 7 U-015.7 A.4.4. 0.04 m3 Pasir Pasan M.9 0.54 255,000 10,200 136,680
Biaya Bahan 22-Jun-20 22-Jun-20 136,680 LT2 ARS H - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 60 H07 [ 268 m2 / 13 har 268 m2 U-019 [ m2 ] Pemasan 1 U-019.1 A.4.4. 0.30 OH Pekerja ( O L.1 80.40 85,000 25,500 6,834,000 Biaya 58,894 20-Jun-20 02-Jul-20 525,692 LT2 ARS H 3 13.0 5
60 H07 [ 268 m2 / 13 har 268 m2 U-019 [ m2 ] Pemasan 2 U-019.2 A.4.4. 0.15 OH Tukang Bat L.3 40.20 100,000 15,000 4,020,000 Biaya 20-Jun-20 02-Jul-20 309,231 LT2 ARS H 1 2
60 H07 [ 268 m2 / 13 har 268 m2 U-019 [ m2 ] Pemasan 3 U-019.3 A.4.4. 0.02 OH Kepala Tuk L.9 4.02 150,000 2,250 603,000 Biaya 20-Jun-20 02-Jul-20 46,385 LT2 ARS H 1 2
60 H07 [ 268 m2 / 13 har 268 m2 U-019 [ m2 ] Pemasan 4 U-019.4 A.4.4. 0.02 OH Mandor ( O L.10 4.02 185,000 2,775 743,700 Biaya 20-Jun-20 02-Jul-20 57,208 LT2 ARS H 1 1
60 H07 [ 268 m2 / 13 har 268 m2 U-019 [ m2 ] Pemasan 5 U-019.5 A.4.4. 5.18 Kg Semen ( Kg M.12 1389.31 1,300 6,739 1,806,106 Biaya 20-Jun-20 02-Jul-20 138,931 LT2 ARS H - -
60 H07 [ 268 m2 / 13 har 268 m2 U-019 [ m2 ] Pemasan 6 U-019.6 A.4.4. 0.03 m3 Pasir Pasan M.9 6.97 255,000 6,630 1,776,840
Biaya Bahan 20-Jun-20 02-Jul-20 136,680 LT2 ARS H - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

5 61 H08 [ 268 m2 / 9 hari 268 m2 U-020 [ m2 ] Pemasan 1 U-020.1 A.4.4. 0.20 OH Pekerja ( O L.1 53.60 85,000 17,000 4,556,000 Biaya 34,575 26-Jun-20 04-Jul-20 506,222 LT2 ARS H 3 9.0 5
61 H08 [ 268 m2 / 9 hari 268 m2 U-020 [ m2 ] Pemasan 2 U-020.2 A.4.4. 0.10 OH Tukang Bat L.3 26.80 100,000 10,000 2,680,000 Biaya 26-Jun-20 04-Jul-20 297,778 LT2 ARS H 1 2
61 H08 [ 268 m2 / 9 hari 268 m2 U-020 [ m2 ] Pemasan 3 U-020.3 A.4.4. 0.01 OH Kepala Tuk L.9 2.68 150,000 1,500 402,000 Biaya 26-Jun-20 04-Jul-20 44,667 LT2 ARS H 1 2
61 H08 [ 268 m2 / 9 hari 268 m2 U-020 [ m2 ] Pemasan 4 U-020.4 A.4.4. 0.01 OH Mandor ( O L.10 2.68 185,000 1,850 495,800 Biaya 26-Jun-20 04-Jul-20 55,089 LT2 ARS H 1 1
61 H08 [ 268 m2 / 9 hari 268 m2 U-020 [ m2 ] Pemasan 5 U-020.5 A.4.4. 3.25 Kg Semen ( Kg M.12 871.00 1,300 4,225 1,132,300 Biaya 26-Jun-20 04-Jul-20 125,811 LT2 ARS H - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

9 62 I01 [ 161,6 m2 / 12 161.55 m2 U-147 [ m2 ] Pasang 1 U-147.1 0 3.72 m' Baja RinganM.36 600.98 13,333 49,600 8,013,125 Biaya 4-Jul-20 15-Jul-20 667,760 LT2 ARS I - 12.0 -
62 I01 [ 161,6 m2 / 12 161.55 m2 U-147 [ m2 ] Pasang 2 U-147.2 0 38.00 bh Truss ScrewM.114 6139.09 750 28,500 4,604,316 Biaya 4-Jul-20 15-Jul-20 383,693 LT2 ARS I - -
62 I01 [ 161,6 m2 / 12 161.55 m2 U-147 [ m2 ] Pasang 3 U-147.3 0 1.60 bh Baut RamsetM.109 258.49 15,000 24,000 3,877,319 Biaya 4-Jul-20 15-Jul-20 323,110 LT2 ARS I - -
62 I01 [ 161,6 m2 / 12 161.55 m2 U-147 [ m2 ] Pasang 4 U-147.4 0 5.40 m' Baja RinganM.35 872.40 6,667 36,000 5,815,978 Biaya 4-Jul-20 15-Jul-20 484,665 LT2 ARS I - -
62 I01 [ 161,6 m2 / 12 161.55 m2 U-147 [ m2 ] Pasang 5 U-147.5 0 0.12 m' Talang JuraiM.39 20.03 25,000 3,100 500,820 Biaya 4-Jul-20 15-Jul-20 41,735 LT2 ARS I - -
62 I01 [ 161,6 m2 / 12 161.55 m2 U-147 [ m2 ] Pasang 6 U-147.6 0 0.20 Oh Pekerja ( O L.1 32.31 85,000 17,000 2,746,434
Biaya Upah 213,950 4-Jul-20 15-Jul-20 228,870 LT2 ARS I 3 5
62 I01 [ 161,6 m2 / 12 161.55 m2 U-147 [ m2 ] Pasang 7 U-147.7 0 0.45 Oh Tukang Besi L.4 72.70 100,000 45,000 7,269,972
Biaya Upah 4-Jul-20 15-Jul-20 605,831 LT2 ARS I 1 2
62 I01 [ 161,6 m2 / 12 161.55 m2 U-147 [ m2 ] Pasang 8 U-147.8 0 0.01 Oh Kepala Tuk L.9 1.62 150,000 1,500 242,332
Biaya Upah 4-Jul-20 15-Jul-20 20,194 LT2 ARS I 1 2
62 I01 [ 161,6 m2 / 12 161.55 m2 U-147 [ m2 ] Pasang 9 U-147.9 0 0.05 Oh Mandor ( O L.10 8.08 185,000 9,250 1,494,383
Biaya Upah 4-Jul-20 15-Jul-20 124,532 LT2 ARS I 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 63 I02 [ 161,6 m2 / 6 h 161.55 m2 U-080 [ m2 ] Pemasan 1 U-080.1 A.4.5. 0.20 OH Pekerja ( O L.1 32.31 85,000 17,000 2,746,434 Biaya 178,985 15-Jul-20 20-Jul-20 457,739 LT2 ARS I 3 6.0 5
63 I02 [ 161,6 m2 / 6 h 161.55 m2 U-080 [ m2 ] Pemasan 2 U-080.2 A.4.5. 0.10 OH Tukang Kay L.6 16.16 100,000 10,000 1,615,549 Biaya 15-Jul-20 20-Jul-20 269,258 LT2 ARS I 1 2
63 I02 [ 161,6 m2 / 6 h 161.55 m2 U-080 [ m2 ] Pemasan 3 U-080.3 A.4.5. 0.01 OH Kepala tuka L.9 1.62 150,000 1,500 242,332 Biaya 15-Jul-20 20-Jul-20 40,389 LT2 ARS I 1 2
63 I02 [ 161,6 m2 / 6 h 161.55 m2 U-080 [ m2 ] Pemasan 4 U-080.4 A.4.5. 0.00 OH Mandor ( O L.10 0.16 185,000 185 29,888 Biaya 15-Jul-20 20-Jul-20 4,981 LT2 ARS I 1 1
63 I02 [ 161,6 m2 / 6 h 161.55 m2 U-080 [ m2 ] Pemasan 5 U-080.5 A.4.5. 1.30 Bh Atap GentenM.33 210.02 112,000 145,600 23,522,400 Biaya 15-Jul-20 20-Jul-20 3,920,400 LT2 ARS I - -
63 I02 [ 161,6 m2 / 6 h 161.55 m2 U-080 [ m2 ] Pemasan 6 U-080.6 A.4.5. 0.20 Kg Paku Biasa M.110 32.31 23,500 4,700 759,308
Biaya Bahan 15-Jul-20 20-Jul-20 126,551 LT2 ARS I - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 64 I03 [ 27 m1 / 2 hari 26.909 m1 U-082 [ m1 ] Pemasa 1 U-082.1 A.4.5. 0.25 OH Pekerja ( O L.1 6.73 85,000 21,250 571,814 Biaya 133,455 18-Jul-20 19-Jul-20 285,907 LT2 ARS I 3 2.0 5
64 I03 [ 27 m1 / 2 hari 26.909 m1 U-082 [ m1 ] Pemasa 2 U-082.2 A.4.5. 0.15 OH Tukang Kay L.6 4.04 100,000 15,000 403,634 Biaya 18-Jul-20 19-Jul-20 201,817 LT2 ARS I 1 2
64 I03 [ 27 m1 / 2 hari 26.909 m1 U-082 [ m1 ] Pemasa 3 U-082.3 A.4.5. 0.02 OH Kepala tuka L.9 0.40 150,000 2,250 60,545 Biaya 18-Jul-20 19-Jul-20 30,273 LT2 ARS I 1 2
64 I03 [ 27 m1 / 2 hari 26.909 m1 U-082 [ m1 ] Pemasa 4 U-082.4 A.4.5. 0.01 OH Mandor ( O L.10 0.35 185,000 2,405 64,716 Biaya 18-Jul-20 19-Jul-20 32,358 LT2 ARS I 1 1
64 I03 [ 27 m1 / 2 hari 26.909 m1 U-082 [ m1 ] Pemasa 5 U-082.5 A.4.5. 1.10 Bh nok gentengM.37 29.60 83,000 91,300 2,456,783 Biaya 18-Jul-20 19-Jul-20 1,228,391 LT2 ARS I - -
64 I03 [ 27 m1 / 2 hari 26.909 m1 U-082 [ m1 ] Pemasa 6 U-082.6 A.4.5. 0.05 Kg Paku Biasa M.111 1.35 25,000 1,250 33,636
Biaya Bahan 18-Jul-20 19-Jul-20 16,818 LT2 ARS I - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 65 I04 [ 50 m1 / 2 hari 50 m1 U-083 [ m1 ] Pemasan 1 U-083.1 A.4.6. 0.10 OH Pekerja ( O L.1 5.00 85,000 8,500 425,000 Biaya 128,885 18-Jul-20 19-Jul-20 212,500 LT2 ARS I 3 2.0 5
65 I04 [ 50 m1 / 2 hari 50 m1 U-083 [ m1 ] Pemasan 2 U-083.2 A.4.6. 0.20 OH Tukang kay L.6 10.00 100,000 20,000 1,000,000 Biaya 18-Jul-20 19-Jul-20 500,000 LT2 ARS I 1 2
65 I04 [ 50 m1 / 2 hari 50 m1 U-083 [ m1 ] Pemasan 3 U-083.3 A.4.6. 0.02 OH Kepala tuka L.9 1.00 150,000 3,000 150,000 Biaya 18-Jul-20 19-Jul-20 75,000 LT2 ARS I 1 2
65 I04 [ 50 m1 / 2 hari 50 m1 U-083 [ m1 ] Pemasan 4 U-083.4 A.4.6. 0.01 OH Mandor ( O L.10 0.25 185,000 925 46,250 Biaya 18-Jul-20 19-Jul-20 23,125 LT2 ARS I 1 1
65 I04 [ 50 m1 / 2 hari 50 m1 U-083 [ m1 ] Pemasan 5 U-083.5 A.4.6. 0.01 m3 Papan KayuM.105 0.54 8,700,000 93,960 4,698,000 Biaya 18-Jul-20 19-Jul-20 2,349,000 LT2 ARS I - -
65 I04 [ 50 m1 / 2 hari 50 m1 U-083 [ m1 ] Pemasan 6 U-083.6 A.4.6. 0.10 kg Paku Biasa 2M.111 5.00 25,000 2,500 125,000
Biaya Bahan 18-Jul-20 19-Jul-20 62,500 LT2 ARS I - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

7 66 I05 [ 50 m1 / 3 hari 50 m1 U-085 [ m1 ] Pemasan 1 U-085.1 A.4.2. 0.15 OH Pekerja ( O L.1 7.50 85,000 12,750 637,500 Biaya 97,230 19-Jul-20 21-Jul-20 212,500 LT2 ARS I 3 3.0 5
66 I05 [ 50 m1 / 3 hari 50 m1 U-085 [ m1 ] Pemasan 2 U-085.2 A.4.2. 0.30 OH Tukang Ata L.2 15.00 100,000 30,000 1,500,000 Biaya 19-Jul-20 21-Jul-20 500,000 LT2 ARS I 1 2
66 I05 [ 50 m1 / 3 hari 50 m1 U-085 [ m1 ] Pemasan 3 U-085.3 A.4.2. 0.03 OH Kepala tuka L.9 1.50 150,000 4,500 225,000 Biaya 19-Jul-20 21-Jul-20 75,000 LT2 ARS I 1 2
66 I05 [ 50 m1 / 3 hari 50 m1 U-085 [ m1 ] Pemasan 4 U-085.4 A.4.2. 0.01 OH Mandor ( O L.10 0.40 185,000 1,480 74,000 Biaya 19-Jul-20 21-Jul-20 24,667 LT2 ARS I 1 1
66 I05 [ 50 m1 / 3 hari 50 m1 U-085 [ m1 ] Pemasan 5 U-085.5 A.4.2. 0.60 lbr Seng GelombM.61 30.00 70,000 42,000 2,100,000 Biaya 19-Jul-20 21-Jul-20 700,000 LT2 ARS I - -
66 I05 [ 50 m1 / 3 hari 50 m1 U-085 [ m1 ] Pemasan 6 U-085.6 A.4.2. 0.01 kg Paku Biasa 2M.111 0.50 25,000 250 12,500
Biaya Bahan 19-Jul-20 21-Jul-20 4,167 LT2 ARS I - -
66 I05 [ 50 m1 / 3 hari 50 m1 U-085 [ m1 ] Pemasan 7 U-085.7 A.4.2. 0.50 kg Baja strip ( M.15 25.00 12,500 6,250 312,500
Biaya Bahan 19-Jul-20 21-Jul-20 104,167 LT2 ARS I - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

5 67 J01 [ 2 unit / 1 har 2 unit U-121 [ unit ] Peker 1 U-121.1 AK-I. 1.00 set Pintu UtamaM.119 2.00 2,100,000 2,100,000 4,200,000 Biaya 23-Jul-20 23-Jul-20 4,200,000 FN1 ARS J - 1.0 -
67 J01 [ 2 unit / 1 har 2 unit U-121 [ unit ] Peker 2 U-121.2 AK-I. 0.40 Ls Perlengkap A.4 0.80 250,000 100,000 200,000 Biaya A 23-Jul-20 23-Jul-20 200,000 FN1 ARS J - -
67 J01 [ 2 unit / 1 har 2 unit U-121 [ unit ] Peker 3 U-121.3 AK-I. 0.50 Oh Pekerja ( O L.1 1.00 85,000 42,500 85,000 Biaya 2,341,000 23-Jul-20 23-Jul-20 85,000 FN1 ARS J 3 5
67 J01 [ 2 unit / 1 har 2 unit U-121 [ unit ] Peker 4 U-121.4 AK-I. 0.80 Oh Tukang Kay L.6 1.60 100,000 80,000 160,000 Biaya 23-Jul-20 23-Jul-20 160,000 FN1 ARS J 1 2
67 J01 [ 2 unit / 1 har 2 unit U-121 [ unit ] Peker 5 U-121.5 AK-I. 0.10 Oh Mandor ( O L.10 0.20 185,000 18,500 37,000 Biaya 23-Jul-20 23-Jul-20 37,000 FN1 ARS J 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

5 68 J02 [ 7 unit / 2 har 7 unit U-122 [ unit ] Peker 1 U-122.1 AK-I. 1.00 set Pintu UtamaM.120 7.00 1,600,000 1,600,000 11,200,000 Biaya 23-Jul-20 24-Jul-20 5,600,000 FN1 ARS J - 2.0 -
68 J02 [ 7 unit / 2 har 7 unit U-122 [ unit ] Peker 2 U-122.2 AK-I. 0.40 Ls Perlengkap A.4 2.80 250,000 100,000 700,000 Biaya A 23-Jul-20 24-Jul-20 350,000 FN1 ARS J - -
68 J02 [ 7 unit / 2 har 7 unit U-122 [ unit ] Peker 3 U-122.3 AK-I. 0.50 Oh Pekerja ( O L.1 3.50 85,000 42,500 297,500 Biaya 1,841,000 23-Jul-20 24-Jul-20 148,750 FN1 ARS J 3 5
68 J02 [ 7 unit / 2 har 7 unit U-122 [ unit ] Peker 4 U-122.4 AK-I. 0.80 Oh Tukang Kay L.6 5.60 100,000 80,000 560,000 Biaya 23-Jul-20 24-Jul-20 280,000 FN1 ARS J 1 2
68 J02 [ 7 unit / 2 har 7 unit U-122 [ unit ] Peker 5 U-122.5 AK-I. 0.10 Oh Mandor ( O L.10 0.70 185,000 18,500 129,500 Biaya 23-Jul-20 24-Jul-20 64,750 FN1 ARS J 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

5 69 J03 [ 3 unit / 1 har 3 unit U-123 [ unit ] Peker 1 U-123.1 AK-I. 1.00 set Pintu UtamaM.121 3.00 1,100,000 1,100,000 3,300,000 Biaya 23-Jul-20 23-Jul-20 3,300,000 FN1 ARS J - 1.0 -
69 J03 [ 3 unit / 1 har 3 unit U-123 [ unit ] Peker 2 U-123.2 AK-I. 0.40 Ls Perlengkap A.4 1.20 250,000 100,000 300,000 Biaya A 23-Jul-20 23-Jul-20 300,000 FN1 ARS J - -
69 J03 [ 3 unit / 1 har 3 unit U-123 [ unit ] Peker 3 U-123.3 AK-I. 0.50 Oh Pekerja ( O L.1 1.50 85,000 42,500 127,500 Biaya 1,341,000 23-Jul-20 23-Jul-20 127,500 FN1 ARS J 3 5
69 J03 [ 3 unit / 1 har 3 unit U-123 [ unit ] Peker 4 U-123.4 AK-I. 0.80 Oh Tukang Kay L.6 2.40 100,000 80,000 240,000 Biaya 23-Jul-20 23-Jul-20 240,000 FN1 ARS J 1 2
69 J03 [ 3 unit / 1 har 3 unit U-123 [ unit ] Peker 5 U-123.5 AK-I. 0.10 Oh Mandor ( O L.10 0.30 185,000 18,500 55,500 Biaya 23-Jul-20 23-Jul-20 55,500 FN1 ARS J 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

5 70 J04 [ 4 unit / 1 har 4 unit U-124 [ unit ] Peker 1 U-124.1 AK-I. 1.00 set Jendela Type
M.122 4.00 980,000 980,000 3,920,000 Biaya 22-Jul-20 22-Jul-20 3,920,000 FN1 ARS J - 1.0 -
70 J04 [ 4 unit / 1 har 4 unit U-124 [ unit ] Peker 2 U-124.2 AK-I. 0.20 Ls Perlengkap A.4 0.80 250,000 50,000 200,000 Biaya A 22-Jul-20 22-Jul-20 200,000 FN1 ARS J - -
70 J04 [ 4 unit / 1 har 4 unit U-124 [ unit ] Peker 3 U-124.3 AK-I. 0.30 Oh Pekerja ( O L.1 1.20 85,000 25,500 102,000 Biaya 1,124,750 22-Jul-20 22-Jul-20 102,000 FN1 ARS J 3 5
70 J04 [ 4 unit / 1 har 4 unit U-124 [ unit ] Peker 4 U-124.4 AK-I. 0.60 Oh Tukang Kay L.6 2.40 100,000 60,000 240,000 Biaya 22-Jul-20 22-Jul-20 240,000 FN1 ARS J 1 2
70 J04 [ 4 unit / 1 har 4 unit U-124 [ unit ] Peker 5 U-124.5 AK-I. 0.05 Oh Mandor ( O L.10 0.20 185,000 9,250 37,000 Biaya 22-Jul-20 22-Jul-20 37,000 FN1 ARS J 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

5 71 J05 [ 3 unit / 1 har 3 unit U-125 [ unit ] Peker 1 U-125.1 AK-I. 1.00 set Jendela Type
M.123 3.00 600,000 600,000 1,800,000 Biaya 21-Jul-20 21-Jul-20 1,800,000 FN1 ARS J - 1.0 -
71 J05 [ 3 unit / 1 har 3 unit U-125 [ unit ] Peker 2 U-125.2 AK-I. 0.40 Ls Perlengkap A.4 1.20 250,000 100,000 300,000 Biaya A 21-Jul-20 21-Jul-20 300,000 FN1 ARS J - -
71 J05 [ 3 unit / 1 har 3 unit U-125 [ unit ] Peker 3 U-125.3 AK-I. 0.50 Oh Pekerja ( O L.1 1.50 85,000 42,500 127,500 Biaya 835,450 21-Jul-20 21-Jul-20 127,500 FN1 ARS J 3 5
71 J05 [ 3 unit / 1 har 3 unit U-125 [ unit ] Peker 4 U-125.4 AK-I. 0.80 Oh Tukang Kay L.6 2.40 100,000 80,000 240,000 Biaya 21-Jul-20 21-Jul-20 240,000 FN1 ARS J 1 2
71 J05 [ 3 unit / 1 har 3 unit U-125 [ unit ] Peker 5 U-125.5 AK-I. 0.07 Oh Mandor ( O L.10 0.21 185,000 12,950 38,850 Biaya 21-Jul-20 21-Jul-20 38,850 FN1 ARS J 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

5 72 J06 [ 28 unit / 1 ha 28 unit U-127 [ unit ] Peker 1 U-127.1 AK-I. 1.00 Unit Lubang AngiM.126 28.00 25,500 25,500 714,000 Biaya 20-Jul-20 20-Jul-20 714,000 FN1 ARS J - 1.0 -
72 J06 [ 28 unit / 1 ha 28 unit U-127 [ unit ] Peker 2 U-127.2 AK-I. 0.01 Ls Perlengkap A.4 0.28 250,000 2,500 70,000 Biaya A 20-Jul-20 20-Jul-20 70,000 FN1 ARS J - -
72 J06 [ 28 unit / 1 ha 28 unit U-127 [ unit ] Peker 3 U-127.3 AK-I. 0.01 Oh Pekerja ( O L.1 0.28 85,000 850 23,800 Biaya 35,700 20-Jul-20 20-Jul-20 23,800 FN1 ARS J 3 5
72 J06 [ 28 unit / 1 ha 28 unit U-127 [ unit ] Peker 4 U-127.4 AK-I. 0.05 Oh Tukang Batu L.3 1.40 100,000 5,000 140,000 Biaya 20-Jul-20 20-Jul-20 140,000 FN1 ARS J 1 2
72 J06 [ 28 unit / 1 ha 28 unit U-127 [ unit ] Peker 5 U-127.5 AK-I. 0.01 Oh Mandor ( O L.10 0.28 185,000 1,850 51,800 Biaya 20-Jul-20 20-Jul-20 51,800 FN1 ARS J 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 73 K01 [ 66 m1 / 1 hari 66 m1 U-087 [ m1 ] Pemasa 1 U-087.1 A.5.1. 0.04 OH Pekerja ( O L.1 2.38 85,000 3,060 201,960 Biaya 23,930 3-Jul-20 03-Jul-20 201,960 FN1 MEK K 3 1.0 5
73 K01 [ 66 m1 / 1 hari 66 m1 U-087 [ m1 ] Pemasa 2 U-087.2 A.5.1. 0.06 OH Tukang bat L.3 3.96 100,000 6,000 396,000 Biaya 3-Jul-20 03-Jul-20 396,000 FN1 MEK K 1 2
73 K01 [ 66 m1 / 1 hari 66 m1 U-087 [ m1 ] Pemasa 3 U-087.3 A.5.1. 0.01 OH Kepala tuka L.9 0.40 150,000 900 59,400 Biaya 3-Jul-20 03-Jul-20 59,400 FN1 MEK K 1 2
73 K01 [ 66 m1 / 1 hari 66 m1 U-087 [ m1 ] Pemasa 4 U-087.4 A.5.1. 0.00 OH Mandor ( O L.10 0.13 185,000 370 24,420 Biaya 3-Jul-20 03-Jul-20 24,420 FN1 MEK K 1 1
73 K01 [ 66 m1 / 1 hari 66 m1 U-087 [ m1 ] Pemasa 5 U-087.5 A.5.1. 1.20 M Pipa PVC 3/M.50 79.20 5,500 6,600 435,600 Biaya 3-Jul-20 03-Jul-20 435,600 FN1 MEK K - -
73 K01 [ 66 m1 / 1 hari 66 m1 U-087 [ m1 ] Pemasa 6 U-087.6 A.5.1. 0.35 Ls Perlengkap A.5 23.10 20,000 7,000 462,000Biaya Alat 3-Jul-20 03-Jul-20 462,000 FN1 MEK K - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 74 K02 [ 35 m1 / 1 hari 35 m1 U-086 [ m1 ] Pemasa 1 U-086.1 A.5.1. 0.04 OH Pekerja ( O L.1 1.26 85,000 3,060 107,100 Biaya 22,130 3-Jul-20 03-Jul-20 107,100 FN1 MEK K 3 1.0 5
74 K02 [ 35 m1 / 1 hari 35 m1 U-086 [ m1 ] Pemasa 2 U-086.2 A.5.1. 0.06 OH Tukang bat L.3 2.10 100,000 6,000 210,000 Biaya 3-Jul-20 03-Jul-20 210,000 FN1 MEK K 1 2
74 K02 [ 35 m1 / 1 hari 35 m1 U-086 [ m1 ] Pemasa 3 U-086.3 A.5.1. 0.01 OH Kepala tuka L.9 0.21 150,000 900 31,500 Biaya 3-Jul-20 03-Jul-20 31,500 FN1 MEK K 1 2
74 K02 [ 35 m1 / 1 hari 35 m1 U-086 [ m1 ] Pemasa 4 U-086.4 A.5.1. 0.00 OH Mandor ( O L.10 0.07 185,000 370 12,950 Biaya 3-Jul-20 03-Jul-20 12,950 FN1 MEK K 1 1
74 K02 [ 35 m1 / 1 hari 35 m1 U-086 [ m1 ] Pemasa 5 U-086.5 A.5.1. 1.20 M Pipa PVC 1/M.46 42.00 4,000 4,800 168,000 Biaya 3-Jul-20 03-Jul-20 168,000 FN1 MEK K - -
74 K02 [ 35 m1 / 1 hari 35 m1 U-086 [ m1 ] Pemasa 6 U-086.6 A.5.1. 0.35 Ls Perlengkap A.5 12.25 20,000 7,000 245,000Biaya Alat 3-Jul-20 03-Jul-20 245,000 FN1 MEK K - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 75 K03 [ 6 bh / 1 hari 6 bh U-091 [ bh ] Pemasan 1 U-091.1 A.5.1. 0.01 OH Pekerja ( O L.1 0.06 85,000 850 5,100 Biaya 72,888 3-Jul-20 03-Jul-20 5,100 FN1 MEK K 3 1.0 5
75 K03 [ 6 bh / 1 hari 6 bh U-091 [ bh ] Pemasan 2 U-091.2 A.5.1. 0.40 OH Tukang bat L.3 2.40 100,000 40,000 240,000 Biaya 3-Jul-20 03-Jul-20 240,000 FN1 MEK K 1 2
75 K03 [ 6 bh / 1 hari 6 bh U-091 [ bh ] Pemasan 3 U-091.3 A.5.1. 0.04 OH Kepala tuka L.9 0.24 150,000 6,000 36,000 Biaya 3-Jul-20 03-Jul-20 36,000 FN1 MEK K 1 2
75 K03 [ 6 bh / 1 hari 6 bh U-091 [ bh ] Pemasan 4 U-091.4 A.5.1. 0.01 OH Mandor ( O L.10 0.03 185,000 925 5,550 Biaya 3-Jul-20 03-Jul-20 5,550 FN1 MEK K 1 1
75 K03 [ 6 bh / 1 hari 6 bh U-091 [ bh ] Pemasan 5 U-091.5 A.5.1. 1.00 M Kran air ( M.45 6.00 25,000 25,000 150,000 Biaya 3-Jul-20 03-Jul-20 150,000 FN1 MEK K - -
75 K03 [ 6 bh / 1 hari 6 bh U-091 [ bh ] Pemasan 6 U-091.6 A.5.1. 0.03 bh Sealtape ( bM.144 0.15 4,500 113 675
Biaya Bahan 3-Jul-20 03-Jul-20 675 FN1 MEK K - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

### 76 K04 [ 4 Unit / 3 har 4 Unit U-099 [ Unit ] Pek. 1 U-099.1 0 0.28 OH Mandor ( O L.10 1.11 185,000 51,110 204,439 Biaya 3-Jul-20 05-Jul-20 68,146 FN1 MEK K 1 3.0 1
76 K04 [ 4 Unit / 3 har 4 Unit U-099 [ Unit ] Pek. 2 U-099.2 0 0.00 OH Kepala Tuk L.9 0.01 150,000 267 1,068 Biaya 3-Jul-20 05-Jul-20 356 FN1 MEK K 1 2
76 K04 [ 4 Unit / 3 har 4 Unit U-099 [ Unit ] Pek. 3 U-099.3 0 3.02 OH Tukang Bat L.3 12.07 100,000 301,749 1,206,994 Biaya 3-Jul-20 05-Jul-20 402,331 FN1 MEK K 1 2
76 K04 [ 4 Unit / 3 har 4 Unit U-099 [ Unit ] Pek. 4 U-099.4 0 3.10 OH Pekerja ( O L.1 12.40 85,000 263,602 1,054,406 Biaya 1,471,503 3-Jul-20 05-Jul-20 351,469 FN1 MEK K 3 5
76 K04 [ 4 Unit / 3 har 4 Unit U-099 [ Unit ] Pek. 5 U-099.5 0 23.59 kg Semen ( kg M.12 94.36 1,300 30,667 122,668 Biaya 3-Jul-20 05-Jul-20 40,889 FN1 MEK K - -
76 K04 [ 4 Unit / 3 har 4 Unit U-099 [ Unit ] Pek. 6 U-099.6 0 0.03 m3 Pasir Pasan M.9 0.14 255,000 8,706 34,823
Biaya Bahan 3-Jul-20 05-Jul-20 11,608 FN1 MEK K - -
76 K04 [ 4 Unit / 3 har 4 Unit U-099 [ Unit ] Pek. 7 U-099.7 0 0.05 m3 Kerikil ( m3 M.7 0.19 220,000 10,462 41,846
Biaya Bahan 3-Jul-20 05-Jul-20 13,949 FN1 MEK K - -
76 K04 [ 4 Unit / 3 har 4 Unit U-099 [ Unit ] Pek. 8 U-099.8 0 13.67 Ltr Air ( Ltr ) M.1 54.68 50 684 2,734
Biaya Bahan 3-Jul-20 05-Jul-20 911 FN1 MEK K - -
76 K04 [ 4 Unit / 3 har 4 Unit U-099 [ Unit ] Pek. 9 U-099.9 0 15.20 m1 Besi Ø8 (Po M.22 60.80 4,091 62,182 248,727
Biaya Bahan 3-Jul-20 05-Jul-20 82,909 FN1 MEK K - -
76 K04 [ 4 Unit / 3 har 4 Unit U-099 [ Unit ] Pek. 10 U-099.10 0 1.22 kg Kawat BetonM.27 4.86 23,500 28,576 114,304
Biaya Bahan 3-Jul-20 05-Jul-20 38,101 FN1 MEK K - -
76 K04 [ 4 Unit / 3 har 4 Unit U-099 [ Unit ] Pek. 11 U-099.11 0 3.00 bh Baut M10 ( M.108 12.00 5,000 15,000 60,000
Biaya Bahan 3-Jul-20 05-Jul-20 20,000 FN1 MEK K - -
76 K04 [ 4 Unit / 3 har 4 Unit U-099 [ Unit ] Pek. 12 U-099.12 0 0.64 m2 Pelat 1/8" ( M.28 2.54 265,000 168,500 674,001
Biaya Bahan 3-Jul-20 05-Jul-20 224,667 FN1 MEK K - -
76 K04 [ 4 Unit / 3 har 4 Unit U-099 [ Unit ] Pek. 13 U-099.13 0 3.00 m1 Pipa PVC 3"M.49 12.00 8,000 24,000 96,000
Biaya Bahan 3-Jul-20 05-Jul-20 32,000 FN1 MEK K - -
76 K04 [ 4 Unit / 3 har 4 Unit U-099 [ Unit ] Pek. 14 U-099.14 0 2.00 bh T Bow 3" ( M.53 8.00 35,000 70,000 280,000
Biaya Bahan 3-Jul-20 05-Jul-20 93,333 FN1 MEK K - -
76 K04 [ 4 Unit / 3 har 4 Unit U-099 [ Unit ] Pek. 15 U-099.15 0 3.00 BH Buis beton M.117 12.00 62,000 186,000 744,000
Biaya Bahan 3-Jul-20 05-Jul-20 248,000 FN1 MEK K - -
76 K04 [ 4 Unit / 3 har 4 Unit U-099 [ Unit ] Pek. 16 U-099.16 0 1.00 Ls Perlengkap A.4 4.00 250,000 250,000 1,000,000Biaya Alat 3-Jul-20 05-Jul-20 333,333 FN1 MEK K - -
. . . - -
. . . - -
. . . - -

5 77 K05 [ 1 unit / 1 har 1 unit U-100 [ unit ] Peke 1 U-100.1 AK-I. 1.00 Unit Shower Mand M.52 1.00 460,000 460,000 460,000 Biaya 5-Jul-20 05-Jul-20 460,000 FN1 MEK K - 1.0 -
77 K05 [ 1 unit / 1 har 1 unit U-100 [ unit ] Peke 2 U-100.2 AK-I. 0.10 Ls Perlengkap A.4 0.10 250,000 25,000 25,000 Biaya A 5-Jul-20 05-Jul-20 25,000 FN1 MEK K - -
77 K05 [ 1 unit / 1 har 1 unit U-100 [ unit ] Peke 3 U-100.3 AK-I. 0.20 Oh Pekerja ( O L.1 0.20 85,000 17,000 17,000 Biaya 516,625 5-Jul-20 05-Jul-20 17,000 FN1 MEK K 3 5
77 K05 [ 1 unit / 1 har 1 unit U-100 [ unit ] Peke 4 U-100.4 AK-I. 0.10 Oh Tukang Pipa L.8 0.10 100,000 10,000 10,000 Biaya 5-Jul-20 05-Jul-20 10,000 FN1 MEK K 1 2
77 K05 [ 1 unit / 1 har 1 unit U-100 [ unit ] Peke 5 U-100.5 AK-I. 0.03 Oh Mandor ( O L.10 0.03 185,000 4,625 4,625 Biaya 5-Jul-20 05-Jul-20 4,625 FN1 MEK K 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 78 K06 [ 66 m1 / 2 hari 66 m1 U-089 [ m1 ] Pemasa 1 U-089.1 A.5.1. 0.08 OH Pekerja ( O L.1 5.35 85,000 6,885 454,410 Biaya 39,750 3-Jul-20 04-Jul-20 227,205 FN1 MEK K 3 2.0 5
78 K06 [ 66 m1 / 2 hari 66 m1 U-089 [ m1 ] Pemasa 2 U-089.2 A.5.1. 0.14 OH Tukang bat L.3 8.91 100,000 13,500 891,000 Biaya 3-Jul-20 04-Jul-20 445,500 FN1 MEK K 1 2
78 K06 [ 66 m1 / 2 hari 66 m1 U-089 [ m1 ] Pemasa 3 U-089.3 A.5.1. 0.01 OH Kepala tuka L.9 0.89 150,000 2,025 133,650 Biaya 3-Jul-20 04-Jul-20 66,825 FN1 MEK K 1 2
78 K06 [ 66 m1 / 2 hari 66 m1 U-089 [ m1 ] Pemasa 4 U-089.4 A.5.1. 0.00 OH Mandor ( O L.10 0.26 185,000 740 48,840 Biaya 3-Jul-20 04-Jul-20 24,420 FN1 MEK K 1 1
78 K06 [ 66 m1 / 2 hari 66 m1 U-089 [ m1 ] Pemasa 5 U-089.5 A.5.1. 1.20 m1 Pipa PVC 3"M.49 79.20 8,000 9,600 633,600 Biaya 3-Jul-20 04-Jul-20 316,800 FN1 MEK K - -
78 K06 [ 66 m1 / 2 hari 66 m1 U-089 [ m1 ] Pemasa 6 U-089.6 A.5.1. 0.35 Ls Perlengkap A.5 23.10 20,000 7,000 462,000Biaya Alat 3-Jul-20 04-Jul-20 231,000 FN1 MEK K - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 79 K07 [ 36 m1 / 1 hari 36 m1 U-090 [ m1 ] Pemasa 1 U-090.1 A.5.1. 0.08 OH Pekerja ( O L.1 2.92 85,000 6,885 247,860 Biaya 40,950 3-Jul-20 03-Jul-20 247,860 FN1 MEK K 3 1.0 5
79 K07 [ 36 m1 / 1 hari 36 m1 U-090 [ m1 ] Pemasa 2 U-090.2 A.5.1. 0.14 OH Tukang bat L.3 4.86 100,000 13,500 486,000 Biaya 3-Jul-20 03-Jul-20 486,000 FN1 MEK K 1 2
79 K07 [ 36 m1 / 1 hari 36 m1 U-090 [ m1 ] Pemasa 3 U-090.3 A.5.1. 0.01 OH Kepala tuka L.9 0.49 150,000 2,025 72,900 Biaya 3-Jul-20 03-Jul-20 72,900 FN1 MEK K 1 2
79 K07 [ 36 m1 / 1 hari 36 m1 U-090 [ m1 ] Pemasa 4 U-090.4 A.5.1. 0.00 OH Mandor ( O L.10 0.14 185,000 740 26,640 Biaya 3-Jul-20 03-Jul-20 26,640 FN1 MEK K 1 1
79 K07 [ 36 m1 / 1 hari 36 m1 U-090 [ m1 ] Pemasa 5 U-090.5 A.5.1. 1.20 m1 Pipa PVC 4"M.51 43.20 9,000 10,800 388,800 Biaya 3-Jul-20 03-Jul-20 388,800 FN1 MEK K - -
79 K07 [ 36 m1 / 1 hari 36 m1 U-090 [ m1 ] Pemasa 6 U-090.6 A.5.1. 0.35 Ls Perlengkap A.5 12.60 20,000 7,000 252,000Biaya Alat 3-Jul-20 03-Jul-20 252,000 FN1 MEK K - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 80 K08 [ 1 bh / 1 hari 1 bh U-092 [ bh ] Pemasan 1 U-092.1 A.5.1. 3.30 OH Pekerja ( O L.1 3.30 85,000 280,500 280,500 Biaya 2,936,600 3-Jul-20 03-Jul-20 280,500 FN1 MEK K 3 1.0 5
80 K08 [ 1 bh / 1 hari 1 bh U-092 [ bh ] Pemasan 2 U-092.2 A.5.1. 1.10 OH Tukang bat L.3 1.10 100,000 110,000 110,000 Biaya 3-Jul-20 03-Jul-20 110,000 FN1 MEK K 1 2
80 K08 [ 1 bh / 1 hari 1 bh U-092 [ bh ] Pemasan 3 U-092.3 A.5.1. 0.01 OH Kepala tuka L.9 0.01 150,000 1,500 1,500 Biaya 3-Jul-20 03-Jul-20 1,500 FN1 MEK K 1 2
80 K08 [ 1 bh / 1 hari 1 bh U-092 [ bh ] Pemasan 4 U-092.4 A.5.1. 0.16 OH Mandor ( O L.10 0.16 185,000 29,600 29,600 Biaya 3-Jul-20 03-Jul-20 29,600 FN1 MEK K 1 1
80 K08 [ 1 bh / 1 hari 1 bh U-092 [ bh ] Pemasan 5 U-092.5 A.5.1. 1.00 Unit Kloset DuduM.43 1.00 2,500,000 2,500,000 2,500,000 Biaya 3-Jul-20 03-Jul-20 2,500,000 FN1 MEK K - -
80 K08 [ 1 bh / 1 hari 1 bh U-092 [ bh ] Pemasan 6 U-092.6 A.5.1. 0.06 Ls Perlengkap A.4 0.06 250,000 15,000 15,000Biaya Alat 3-Jul-20 03-Jul-20 15,000 FN1 MEK K - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

7 81 K09 [ 1 bh / 1 hari 1 bh U-093 [ bh ] Pemasan 1 U-093.1 A.5.1. 1.00 OH Pekerja ( O L.1 1.00 85,000 85,000 85,000 Biaya 547,450 3-Jul-20 03-Jul-20 85,000 FN1 MEK K 3 1.0 5
81 K09 [ 1 bh / 1 hari 1 bh U-093 [ bh ] Pemasan 2 U-093.2 A.5.1. 1.50 OH Tukang bat L.3 1.50 100,000 150,000 150,000 Biaya 3-Jul-20 03-Jul-20 150,000 FN1 MEK K 1 2
81 K09 [ 1 bh / 1 hari 1 bh U-093 [ bh ] Pemasan 3 U-093.3 A.5.1. 0.15 OH Kepala tuka L.9 0.15 150,000 22,500 22,500 Biaya 3-Jul-20 03-Jul-20 22,500 FN1 MEK K 1 2
81 K09 [ 1 bh / 1 hari 1 bh U-093 [ bh ] Pemasan 4 U-093.4 A.5.1. 0.16 OH Mandor ( O L.10 0.16 185,000 29,600 29,600 Biaya 3-Jul-20 03-Jul-20 29,600 FN1 MEK K 1 1
81 K09 [ 1 bh / 1 hari 1 bh U-093 [ bh ] Pemasan 5 U-093.5 A.5.1. 1.00 Unit Kloset Jong M.44 1.00 250,000 250,000 250,000 Biaya 3-Jul-20 03-Jul-20 250,000 FN1 MEK K - -
81 K09 [ 1 bh / 1 hari 1 bh U-093 [ bh ] Pemasan 6 U-093.6 A.5.1. 6.00 Kg Semen ( Kg M.12 6.00 1,300 7,800 7,800
Biaya Bahan 3-Jul-20 03-Jul-20 7,800 FN1 MEK K - -
81 K09 [ 1 bh / 1 hari 1 bh U-093 [ bh ] Pemasan 7 U-093.7 A.5.1. 0.01 M3 Pasir pasan M.9 0.01 255,000 2,550 2,550
Biaya Bahan 3-Jul-20 03-Jul-20 2,550 FN1 MEK K - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

8 82 K10 [ 2 bh / 1 hari 2 bh U-094 [ bh ] Pemasan 1 U-094.1 A.5.1. 1.20 OH Pekerja ( O L.1 2.40 85,000 102,000 204,000 Biaya 1,370,950 3-Jul-20 03-Jul-20 204,000 FN1 MEK K 3 1.0 5
82 K10 [ 2 bh / 1 hari 2 bh U-094 [ bh ] Pemasan 2 U-094.2 A.5.1. 1.45 OH Tukang bat L.3 2.90 100,000 145,000 290,000 Biaya 3-Jul-20 03-Jul-20 290,000 FN1 MEK K 1 2
82 K10 [ 2 bh / 1 hari 2 bh U-094 [ bh ] Pemasan 3 U-094.3 A.5.1. 0.15 OH Kepala tuka L.9 0.30 150,000 22,500 45,000 Biaya 3-Jul-20 03-Jul-20 45,000 FN1 MEK K 1 2
82 K10 [ 2 bh / 1 hari 2 bh U-094 [ bh ] Pemasan 4 U-094.4 A.5.1. 0.06 OH Mandor ( O L.10 0.12 185,000 11,100 22,200 Biaya 3-Jul-20 03-Jul-20 22,200 FN1 MEK K 1 1
82 K10 [ 2 bh / 1 hari 2 bh U-094 [ bh ] Pemasan 5 U-094.5 A.5.1. 1.00 Unit Wastafel ( M.55 2.00 1,050,000 1,050,000 2,100,000 Biaya 3-Jul-20 03-Jul-20 2,100,000 FN1 MEK K - -
82 K10 [ 2 bh / 1 hari 2 bh U-094 [ bh ] Pemasan 6 U-094.6 A.5.1. 6.00 Kg Semen ( Kg M.12 12.00 1,300 7,800 15,600
Biaya Bahan 3-Jul-20 03-Jul-20 15,600 FN1 MEK K - -
82 K10 [ 2 bh / 1 hari 2 bh U-094 [ bh ] Pemasan 7 U-094.7 A.5.1. 0.01 M3 Pasir pasan M.9 0.02 255,000 2,550 5,100
Biaya Bahan 3-Jul-20 03-Jul-20 5,100 FN1 MEK K - -
82 K10 [ 2 bh / 1 hari 2 bh U-094 [ bh ] Pemasan 8 U-094.8 A.5.1. 0.12 Ls Perlengkap A.4 0.24 250,000 30,000 60,000Biaya Alat 3-Jul-20 03-Jul-20 60,000 FN1 MEK K - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

5 83 K11 [ 3 bh / 1 hari ] 3 bh U-096 [ bh ] Pemasan 1 U-096.1 A.5.1. 0.01 OH Pekerja ( O L.1 0.03 85,000 850 2,550 Biaya 73,275 3-Jul-20 03-Jul-20 2,550 FN1 MEK K 3 1.0 5
83 K11 [ 3 bh / 1 hari ] 3 bh U-096 [ bh ] Pemasan 2 U-096.2 A.5.1. 0.10 OH Tukang bat L.3 0.30 100,000 10,000 30,000 Biaya 3-Jul-20 03-Jul-20 30,000 FN1 MEK K 1 2
83 K11 [ 3 bh / 1 hari ] 3 bh U-096 [ bh ] Pemasan 3 U-096.3 A.5.1. 0.01 OH Kepala tuka L.9 0.03 150,000 1,500 4,500 Biaya 3-Jul-20 03-Jul-20 4,500 FN1 MEK K 1 2
83 K11 [ 3 bh / 1 hari ] 3 bh U-096 [ bh ] Pemasan 4 U-096.4 A.5.1. 0.01 OH Mandor ( O L.10 0.02 185,000 925 2,775 Biaya 3-Jul-20 03-Jul-20 2,775 FN1 MEK K 1 1
83 K11 [ 3 bh / 1 hari ] 3 bh U-096 [ bh ] Pemasan 5 U-096.5 A.5.1. 1.00 Unit Floor drain M.41 3.00 60,000 60,000 180,000 Biaya 3-Jul-20 03-Jul-20 180,000 FN1 MEK K - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

### 84 K12 [ 1 unit / 2 har 1 unit U-098 [ unit ] Septi 1 U-098.1 0 9.33 OH Pekerja ( O L.1 9.33 85,000 792,744 792,744 Biaya 3,040,999 11-May-20 12-May-20 396,372 FN1 MEK K 3 2.0 5
84 K12 [ 1 unit / 2 har 1 unit U-098 [ unit ] Septi 2 U-098.2 0 0.49 OH Mandor ( O L.10 0.49 185,000 90,745 90,745 Biaya 11-May-20 12-May-20 45,372 FN1 MEK K 1 1
84 K12 [ 1 unit / 2 har 1 unit U-098 [ unit ] Septi 3 U-098.3 0 3.29 OH Tukang Bat L.3 3.29 100,000 329,120 329,120 Biaya 11-May-20 12-May-20 164,560 FN1 MEK K 1 2
84 K12 [ 1 unit / 2 har 1 unit U-098 [ unit ] Septi 4 U-098.4 0 0.33 OH Kepala Tuk L.9 0.33 150,000 49,378 49,378 Biaya 11-May-20 12-May-20 24,689 FN1 MEK K 1 2
84 K12 [ 1 unit / 2 har 1 unit U-098 [ unit ] Septi 5 U-098.5 0 599.20 bh Bata merah M.2 599.20 650 389,480 389,480 Biaya 11-May-20 12-May-20 194,740 FN1 MEK K - -
84 K12 [ 1 unit / 2 har 1 unit U-098 [ unit ] Septi 6 U-098.6 0 276.34 Kg Semen ( Kg M.12 276.34 1,300 359,248 359,248
Biaya Bahan 11-May-20 12-May-20 179,624 FN1 MEK K - -
84 K12 [ 1 unit / 2 har 1 unit U-098 [ unit ] Septi 7 U-098.7 0 0.63 m3 Pasir Pasan M.9 0.63 255,000 161,141 161,141
Biaya Bahan 11-May-20 12-May-20 80,571 FN1 MEK K - -
84 K12 [ 1 unit / 2 har 1 unit U-098 [ unit ] Septi 8 U-098.8 0 0.10 m3 Kerikil ( m3 M.7 0.10 220,000 21,060 21,060
Biaya Bahan 11-May-20 12-May-20 10,530 FN1 MEK K - -
84 K12 [ 1 unit / 2 har 1 unit U-098 [ unit ] Septi 9 U-098.9 0 23.36 m1 Besi Ø8 (Po M.22 23.36 4,091 95,564 95,564
Biaya Bahan 11-May-20 12-May-20 47,782 FN1 MEK K - -
84 K12 [ 1 unit / 2 har 1 unit U-098 [ unit ] Septi 10 U-098.10 0 3.00 m1 Pipa PVC 4"M.51 3.00 9,000 27,000 27,000
Biaya Bahan 11-May-20 12-May-20 13,500 FN1 MEK K - -
84 K12 [ 1 unit / 2 har 1 unit U-098 [ unit ] Septi 11 U-098.11 0 4.00 m1 Pipa PVC 3"M.49 4.00 8,000 32,000 32,000
Biaya Bahan 11-May-20 12-May-20 16,000 FN1 MEK K - -
84 K12 [ 1 unit / 2 har 1 unit U-098 [ unit ] Septi 12 U-098.12 0 1.00 m1 Pipa PVC 1”M.47 1.00 6,000 6,000 6,000
Biaya Bahan 11-May-20 12-May-20 3,000 FN1 MEK K - -
84 K12 [ 1 unit / 2 har 1 unit U-098 [ unit ] Septi 13 U-098.13 0 1.00 bh T Bow 4" ( M.54 1.00 65,000 65,000 65,000
Biaya Bahan 11-May-20 12-May-20 32,500 FN1 MEK K - -
84 K12 [ 1 unit / 2 har 1 unit U-098 [ unit ] Septi 14 U-098.14 0 1.00 bh T Bow 3" ( M.53 1.00 35,000 35,000 35,000
Biaya Bahan 11-May-20 12-May-20 17,500 FN1 MEK K - -
84 K12 [ 1 unit / 2 har 1 unit U-098 [ unit ] Septi 15 U-098.15 0 1.00 bh Dop 3" ( bh M.40 1.00 35,000 35,000 35,000
Biaya Bahan 11-May-20 12-May-20 17,500 FN1 MEK K - -
84 K12 [ 1 unit / 2 har 1 unit U-098 [ unit ] Septi 16 U-098.16 0 0.16 m2 Pelat 1/8" ( M.28 0.16 265,000 42,400 42,400
Biaya Bahan 11-May-20 12-May-20 21,200 FN1 MEK K - -
84 K12 [ 1 unit / 2 har 1 unit U-098 [ unit ] Septi 17 U-098.17 0 1.92 kg Kawat BetonM.27 1.92 23,500 45,120 45,120
Biaya Bahan 11-May-20 12-May-20 22,560 FN1 MEK K - -
84 K12 [ 1 unit / 2 har 1 unit U-098 [ unit ] Septi 18 U-098.18 0 3.00 bh Baut M10 ( M.108 3.00 5,000 15,000 15,000
Biaya Bahan 11-May-20 12-May-20 7,500 FN1 MEK K - -
84 K12 [ 1 unit / 2 har 1 unit U-098 [ unit ] Septi 19 U-098.19 0 1.80 Ls Perlengkap A.4 1.80 250,000 450,000 450,000Biaya Alat 11-May-20 12-May-20 225,000 FN1 MEK K - -

### 85 K13 [ 1 Unit / 1 har 1 Unit U-099 [ Unit ] Pek. 1 U-099.1 0 0.28 OH Mandor ( O L.10 0.28 185,000 51,110 51,110 Biaya 12-May-20 12-May-20 51,110 FN1 MEK K 1 1.0 1
85 K13 [ 1 Unit / 1 har 1 Unit U-099 [ Unit ] Pek. 2 U-099.2 0 0.00 OH Kepala Tuk L.9 0.00 150,000 267 267 Biaya 12-May-20 12-May-20 267 FN1 MEK K 1 2
85 K13 [ 1 Unit / 1 har 1 Unit U-099 [ Unit ] Pek. 3 U-099.3 0 3.02 OH Tukang Bat L.3 3.02 100,000 301,749 301,749 Biaya 12-May-20 12-May-20 301,749 FN1 MEK K 1 2
85 K13 [ 1 Unit / 1 har 1 Unit U-099 [ Unit ] Pek. 4 U-099.4 0 3.10 OH Pekerja ( O L.1 3.10 85,000 263,602 263,602 Biaya 1,471,503 12-May-20 12-May-20 263,602 FN1 MEK K 3 5
85 K13 [ 1 Unit / 1 har 1 Unit U-099 [ Unit ] Pek. 5 U-099.5 0 23.59 kg Semen ( kg M.12 23.59 1,300 30,667 30,667 Biaya 12-May-20 12-May-20 30,667 FN1 MEK K - -
85 K13 [ 1 Unit / 1 har 1 Unit U-099 [ Unit ] Pek. 6 U-099.6 0 0.03 m3 Pasir Pasan M.9 0.03 255,000 8,706 8,706
Biaya Bahan 12-May-20 12-May-20 8,706 FN1 MEK K - -
85 K13 [ 1 Unit / 1 har 1 Unit U-099 [ Unit ] Pek. 7 U-099.7 0 0.05 m3 Kerikil ( m3 M.7 0.05 220,000 10,462 10,462
Biaya Bahan 12-May-20 12-May-20 10,462 FN1 MEK K - -
85 K13 [ 1 Unit / 1 har 1 Unit U-099 [ Unit ] Pek. 8 U-099.8 0 13.67 Ltr Air ( Ltr ) M.1 13.67 50 684 684
Biaya Bahan 12-May-20 12-May-20 684 FN1 MEK K - -
85 K13 [ 1 Unit / 1 har 1 Unit U-099 [ Unit ] Pek. 9 U-099.9 0 15.20 m1 Besi Ø8 (Po M.22 15.20 4,091 62,182 62,182
Biaya Bahan 12-May-20 12-May-20 62,182 FN1 MEK K - -
85 K13 [ 1 Unit / 1 har 1 Unit U-099 [ Unit ] Pek. 10 U-099.10 0 1.22 kg Kawat BetonM.27 1.22 23,500 28,576 28,576
Biaya Bahan 12-May-20 12-May-20 28,576 FN1 MEK K - -
85 K13 [ 1 Unit / 1 har 1 Unit U-099 [ Unit ] Pek. 11 U-099.11 0 3.00 bh Baut M10 ( M.108 3.00 5,000 15,000 15,000
Biaya Bahan 12-May-20 12-May-20 15,000 FN1 MEK K - -
85 K13 [ 1 Unit / 1 har 1 Unit U-099 [ Unit ] Pek. 12 U-099.12 0 0.64 m2 Pelat 1/8" ( M.28 0.64 265,000 168,500 168,500
Biaya Bahan 12-May-20 12-May-20 168,500 FN1 MEK K - -
85 K13 [ 1 Unit / 1 har 1 Unit U-099 [ Unit ] Pek. 13 U-099.13 0 3.00 m1 Pipa PVC 3"M.49 3.00 8,000 24,000 24,000
Biaya Bahan 12-May-20 12-May-20 24,000 FN1 MEK K - -
85 K13 [ 1 Unit / 1 har 1 Unit U-099 [ Unit ] Pek. 14 U-099.14 0 2.00 bh T Bow 3" ( M.53 2.00 35,000 70,000 70,000
Biaya Bahan 12-May-20 12-May-20 70,000 FN1 MEK K - -
85 K13 [ 1 Unit / 1 har 1 Unit U-099 [ Unit ] Pek. 15 U-099.15 0 3.00 BH Buis beton M.117 3.00 62,000 186,000 186,000
Biaya Bahan 12-May-20 12-May-20 186,000 FN1 MEK K - -
85 K13 [ 1 Unit / 1 har 1 Unit U-099 [ Unit ] Pek. 16 U-099.16 0 1.00 Ls Perlengkap A.4 1.00 250,000 250,000 250,000Biaya Alat 12-May-20 12-May-20 250,000 FN1 MEK K - -
. . . - -
. . . - -
. . . - -

5 86 L01 [ 2 Unit / 1 ha 2 Unit U-102 [ Unit ] Peke 1 U-102.1 AK-I. 1.00 Unit MCB + Box M.92 2.00 350,000 350,000 700,000 Biaya 27-Jul-20 27-Jul-20 700,000 FN1 ELE L - 1.0 -
86 L01 [ 2 Unit / 1 ha 2 Unit U-102 [ Unit ] Peke 2 U-102.2 AK-I. 0.40 Ls Perlengkap A.4 0.80 250,000 100,000 200,000 Biaya A 27-Jul-20 27-Jul-20 200,000 FN1 ELE L - -
86 L01 [ 2 Unit / 1 ha 2 Unit U-102 [ Unit ] Peke 3 U-102.3 AK-I. 0.40 Oh Pekerja ( O L.1 0.80 85,000 34,000 68,000 Biaya 507,700 27-Jul-20 27-Jul-20 68,000 FN1 ELE L 3 5
86 L01 [ 2 Unit / 1 ha 2 Unit U-102 [ Unit ] Peke 4 U-102.4 AK-I. 0.20 Oh Tukang List L.7 0.40 100,000 20,000 40,000 Biaya 27-Jul-20 27-Jul-20 40,000 FN1 ELE L 1 2
86 L01 [ 2 Unit / 1 ha 2 Unit U-102 [ Unit ] Peke 5 U-102.5 AK-I. 0.02 Oh Mandor ( O L.10 0.04 185,000 3,700 7,400 Biaya 27-Jul-20 27-Jul-20 7,400 FN1 ELE L 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

5 87 L02 [ 1 btg / 1 hari 1 btg U-103 [ btg ] Peker 1 U-103.1 AK-I. 1.00 btg Grounding RM.31 1.00 650,000 650,000 650,000 Biaya 27-Jul-20 27-Jul-20 650,000 FN1 ELE L - 1.0 -
87 L02 [ 1 btg / 1 hari 1 btg U-103 [ btg ] Peker 2 U-103.2 AK-I. 0.40 Ls Perlengkap A.4 0.40 250,000 100,000 100,000 Biaya A 27-Jul-20 27-Jul-20 100,000 FN1 ELE L - -
87 L02 [ 1 btg / 1 hari 1 btg U-103 [ btg ] Peker 3 U-103.3 AK-I. 0.40 Oh Pekerja ( O L.1 0.40 85,000 34,000 34,000 Biaya 807,700 27-Jul-20 27-Jul-20 34,000 FN1 ELE L 3 5
87 L02 [ 1 btg / 1 hari 1 btg U-103 [ btg ] Peker 4 U-103.4 AK-I. 0.20 Oh Tukang List L.7 0.20 100,000 20,000 20,000 Biaya 27-Jul-20 27-Jul-20 20,000 FN1 ELE L 1 2
87 L02 [ 1 btg / 1 hari 1 btg U-103 [ btg ] Peker 5 U-103.5 AK-I. 0.02 Oh Mandor ( O L.10 0.02 185,000 3,700 3,700 Biaya 27-Jul-20 27-Jul-20 3,700 FN1 ELE L 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
5 88 L03 [ 132 m1 / 1 har 132 m1 U-104 [ m1 ] Pekerj 1 U-104.1 AK-I. 1.10 m1 Kabel NYMM.88 145.20 10,400 11,440 1,510,080 Biaya 27-Jul-20 27-Jul-20 1,510,080 FN1 ELE L - 1.0 -
88 L03 [ 132 m1 / 1 har 132 m1 U-104 [ m1 ] Pekerj 2 U-104.2 AK-I. 0.02 Ls Perlengkap A.4 1.98 250,000 3,750 495,000 Biaya A 27-Jul-20 27-Jul-20 495,000 FN1 ELE L - -
88 L03 [ 132 m1 / 1 har 132 m1 U-104 [ m1 ] Pekerj 3 U-104.3 AK-I. 0.02 Oh Pekerja ( O L.1 2.64 85,000 1,700 224,400 Biaya 18,260 27-Jul-20 27-Jul-20 224,400 FN1 ELE L 3 5
88 L03 [ 132 m1 / 1 har 132 m1 U-104 [ m1 ] Pekerj 4 U-104.4 AK-I. 0.01 Oh Tukang List L.7 1.32 100,000 1,000 132,000 Biaya 27-Jul-20 27-Jul-20 132,000 FN1 ELE L 1 2
88 L03 [ 132 m1 / 1 har 132 m1 U-104 [ m1 ] Pekerj 5 U-104.5 AK-I. 0.00 Oh Mandor ( O L.10 0.26 185,000 370 48,840 Biaya 27-Jul-20 27-Jul-20 48,840 FN1 ELE L 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

5 89 L04 [ 276 m1 / 2 har 276 m1 U-105 [ m1 ] Pekerj 1 U-105.1 AK-I. 1.10 m1 Kabel NYMM.89 303.60 5,600 6,160 1,700,160 Biaya 27-Jul-20 28-Jul-20 850,080 FN1 ELE L - 2.0 -
89 L04 [ 276 m1 / 2 har 276 m1 U-105 [ m1 ] Pekerj 2 U-105.2 AK-I. 0.01 Ls Perlengkap A.4 2.76 250,000 2,500 690,000 Biaya A 27-Jul-20 28-Jul-20 345,000 FN1 ELE L - -
89 L04 [ 276 m1 / 2 har 276 m1 U-105 [ m1 ] Pekerj 3 U-105.3 AK-I. 0.02 Oh Pekerja ( O L.1 5.52 85,000 1,700 469,200 Biaya 11,730 27-Jul-20 28-Jul-20 234,600 FN1 ELE L 3 5
89 L04 [ 276 m1 / 2 har 276 m1 U-105 [ m1 ] Pekerj 4 U-105.4 AK-I. 0.01 Oh Tukang List L.7 2.76 100,000 1,000 276,000 Biaya 27-Jul-20 28-Jul-20 138,000 FN1 ELE L 1 2
89 L04 [ 276 m1 / 2 har 276 m1 U-105 [ m1 ] Pekerj 5 U-105.5 AK-I. 0.00 Oh Mandor ( O L.10 0.55 185,000 370 102,120 Biaya 27-Jul-20 28-Jul-20 51,060 FN1 ELE L 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

5 90 L05 [ 16 Unit / 1 har 16 Unit U-107 [ Unit ] Peker 1 U-107.1 AK-I. 1.00 unit Fitting LampM.93 16.00 25,000 25,000 400,000 Biaya 28-Jul-20 28-Jul-20 400,000 FN1 ELE L - 1.0 -
90 L05 [ 16 Unit / 1 har 16 Unit U-107 [ Unit ] Peker 2 U-107.2 AK-I. 0.02 Ls Perlengkap A.4 0.32 250,000 5,000 80,000 Biaya A 28-Jul-20 28-Jul-20 80,000 FN1 ELE L - -
90 L05 [ 16 Unit / 1 har 16 Unit U-107 [ Unit ] Peker 3 U-107.3 AK-I. 0.04 Oh Pekerja ( O L.1 0.64 85,000 3,400 54,400 Biaya 35,770 28-Jul-20 28-Jul-20 54,400 FN1 ELE L 3 5
90 L05 [ 16 Unit / 1 har 16 Unit U-107 [ Unit ] Peker 4 U-107.4 AK-I. 0.02 Oh Tukang List L.7 0.32 100,000 2,000 32,000 Biaya 28-Jul-20 28-Jul-20 32,000 FN1 ELE L 1 2
90 L05 [ 16 Unit / 1 har 16 Unit U-107 [ Unit ] Peker 5 U-107.5 AK-I. 0.00 Oh Mandor ( O L.10 0.03 185,000 370 5,920 Biaya 28-Jul-20 28-Jul-20 5,920 FN1 ELE L 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
5 91 L06 [ 8 unit / 1 har 8 unit U-108 [ unit ] Peker 1 U-108.1 AK-I. 1.00 unit Saklar Listr M.90 8.00 25,000 25,000 200,000 Biaya 28-Jul-20 28-Jul-20 200,000 FN1 ELE L - 1.0 -
91 L06 [ 8 unit / 1 har 8 unit U-108 [ unit ] Peker 2 U-108.2 AK-I. 0.02 Ls Perlengkap A.4 0.19 250,000 6,000 48,000 Biaya A 28-Jul-20 28-Jul-20 48,000 FN1 ELE L - -
91 L06 [ 8 unit / 1 har 8 unit U-108 [ unit ] Peker 3 U-108.3 AK-I. 0.04 Oh Pekerja ( O L.1 0.32 85,000 3,400 27,200 Biaya 36,770 28-Jul-20 28-Jul-20 27,200 FN1 ELE L 3 5
91 L06 [ 8 unit / 1 har 8 unit U-108 [ unit ] Peker 4 U-108.4 AK-I. 0.02 Oh Tukang List L.7 0.16 100,000 2,000 16,000 Biaya 28-Jul-20 28-Jul-20 16,000 FN1 ELE L 1 2
91 L06 [ 8 unit / 1 har 8 unit U-108 [ unit ] Peker 5 U-108.5 AK-I. 0.00 Oh Mandor ( O L.10 0.02 185,000 370 2,960 Biaya 28-Jul-20 28-Jul-20 2,960 FN1 ELE L 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

5 92 L07 [ 8 unit / 1 hari 8 unit U-106 [ unit ] Peker 1 U-106.1 AK-I. 1.00 unit ReceiptackleM.91 8.00 30,000 30,000 240,000 Biaya 28-Jul-20 28-Jul-20 240,000 FN1 ELE L - 1.0 -
92 L07 [ 8 unit / 1 hari 8 unit U-106 [ unit ] Peker 2 U-106.2 AK-I. 0.03 Ls Perlengkap A.4 0.20 250,000 6,250 50,000 Biaya A 28-Jul-20 28-Jul-20 50,000 FN1 ELE L - -
92 L07 [ 8 unit / 1 hari 8 unit U-106 [ unit ] Peker 3 U-106.3 AK-I. 0.04 Oh Pekerja ( O L.1 0.34 85,000 3,570 28,560 Biaya 42,190 28-Jul-20 28-Jul-20 28,560 FN1 ELE L 3 5
92 L07 [ 8 unit / 1 hari 8 unit U-106 [ unit ] Peker 4 U-106.4 AK-I. 0.02 Oh Tukang List L.7 0.16 100,000 2,000 16,000 Biaya 28-Jul-20 28-Jul-20 16,000 FN1 ELE L 1 2
92 L07 [ 8 unit / 1 hari 8 unit U-106 [ unit ] Peker 5 U-106.5 AK-I. 0.00 Oh Mandor ( O L.10 0.02 185,000 370 2,960 Biaya 28-Jul-20 28-Jul-20 2,960 FN1 ELE L 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

5 93 L08 [ 5 unit / 1 hari 5 unit U-109 [ unit ] Peke 1 U-109.1 AK-I. 1.00 unit Lampu 5W M ( .131 5.00 24,000 24,000 120,000 Biaya 28-Jul-20 28-Jul-20 120,000 FN1 ELE L - 1.0 -
93 L08 [ 5 unit / 1 hari 5 unit U-109 [ unit ] Peke 2 U-109.2 AK-I. 0.01 Ls Perlengkap A.4 0.05 250,000 2,500 12,500 Biaya A 28-Jul-20 28-Jul-20 12,500 FN1 ELE L - -
93 L08 [ 5 unit / 1 hari 5 unit U-109 [ unit ] Peke 3 U-109.3 AK-I. 0.04 Oh Pekerja ( O L.1 0.20 85,000 3,400 17,000 Biaya 31,085 28-Jul-20 28-Jul-20 17,000 FN1 ELE L 3 5
93 L08 [ 5 unit / 1 hari 5 unit U-109 [ unit ] Peke 4 U-109.4 AK-I. 0.01 Oh Tukang List L.7 0.05 100,000 1,000 5,000 Biaya 28-Jul-20 28-Jul-20 5,000 FN1 ELE L 1 2
93 L08 [ 5 unit / 1 hari 5 unit U-109 [ unit ] Peke 5 U-109.5 AK-I. 0.00 Oh Mandor ( O L.10 0.01 185,000 185 925 Biaya 28-Jul-20 28-Jul-20 925 FN1 ELE L 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

5 94 L09 [ 8 unit / 1 hari 8 unit U-110 [ unit ] Peke 1 U-110.1 AK-I. 1.00 unit Lampu 15WM.129 8.00 39,000 39,000 312,000 Biaya 28-Jul-20 28-Jul-20 312,000 FN1 ELE L - 1.0 -
94 L09 [ 8 unit / 1 hari 8 unit U-110 [ unit ] Peke 2 U-110.2 AK-I. 0.01 Ls Perlengkap A.4 0.08 250,000 2,500 20,000 Biaya A 28-Jul-20 28-Jul-20 20,000 FN1 ELE L - -
94 L09 [ 8 unit / 1 hari 8 unit U-110 [ unit ] Peke 3 U-110.3 AK-I. 0.04 Oh Pekerja ( O L.1 0.32 85,000 3,400 27,200 Biaya 46,085 28-Jul-20 28-Jul-20 27,200 FN1 ELE L 3 5
94 L09 [ 8 unit / 1 hari 8 unit U-110 [ unit ] Peke 4 U-110.4 AK-I. 0.01 Oh Tukang List L.7 0.08 100,000 1,000 8,000 Biaya 28-Jul-20 28-Jul-20 8,000 FN1 ELE L 1 2
94 L09 [ 8 unit / 1 hari 8 unit U-110 [ unit ] Peke 5 U-110.5 AK-I. 0.00 Oh Mandor ( O L.10 0.01 185,000 185 1,480 Biaya 28-Jul-20 28-Jul-20 1,480 FN1 ELE L 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

5 95 L10 [ 3 unit / 1 hari 3 unit U-111 [ unit ] Peke 1 U-111.1 AK-I. 1.00 unit Lampu 20WM.130 3.00 45,000 45,000 135,000 Biaya 28-Jul-20 28-Jul-20 135,000 FN1 ELE L - 1.0 -
95 L10 [ 3 unit / 1 hari 3 unit U-111 [ unit ] Peke 2 U-111.2 AK-I. 0.01 Ls Perlengkap A.4 0.03 250,000 2,500 7,500 Biaya A 28-Jul-20 28-Jul-20 7,500 FN1 ELE L - -
95 L10 [ 3 unit / 1 hari 3 unit U-111 [ unit ] Peke 3 U-111.3 AK-I. 0.04 Oh Pekerja ( O L.1 0.12 85,000 3,400 10,200 Biaya 52,085 28-Jul-20 28-Jul-20 10,200 FN1 ELE L 3 5
95 L10 [ 3 unit / 1 hari 3 unit U-111 [ unit ] Peke 4 U-111.4 AK-I. 0.01 Oh Tukang List L.7 0.03 100,000 1,000 3,000 Biaya 28-Jul-20 28-Jul-20 3,000 FN1 ELE L 1 2
95 L10 [ 3 unit / 1 hari 3 unit U-111 [ unit ] Peke 5 U-111.5 AK-I. 0.00 Oh Mandor ( O L.10 0.00 185,000 185 555 Biaya 28-Jul-20 28-Jul-20 555 FN1 ELE L 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

5 96 M01 [ 9,5 unit / 1 ha 9.43 unit U-111 [ unit ] Peke 1 U-111.1 AK-I. 1.00 unit Lampu 20WM.130 9.43 45,000 45,000 424,350 Biaya 20-Jul-20 20-Jul-20 424,350 FN1 ARS M - 1.0 -
96 M01 [ 9,5 unit / 1 ha 9.43 unit U-111 [ unit ] Peke 2 U-111.2 AK-I. 0.01 Ls Perlengkap A.4 0.09 250,000 2,500 23,575 Biaya A 20-Jul-20 20-Jul-20 23,575 FN1 ARS M - -
96 M01 [ 9,5 unit / 1 ha 9.43 unit U-111 [ unit ] Peke 3 U-111.3 AK-I. 0.04 Oh Pekerja ( O L.1 0.38 85,000 3,400 32,062 Biaya 52,085 20-Jul-20 20-Jul-20 32,062 FN1 ARS M 3 5
96 M01 [ 9,5 unit / 1 ha 9.43 unit U-111 [ unit ] Peke 4 U-111.4 AK-I. 0.01 Oh Tukang List L.7 0.09 100,000 1,000 9,430 Biaya 20-Jul-20 20-Jul-20 9,430 FN1 ARS M 1 2
96 M01 [ 9,5 unit / 1 ha 9.43 unit U-111 [ unit ] Peke 5 U-111.5 AK-I. 0.00 Oh Mandor ( O L.10 0.01 185,000 185 1,745 Biaya 20-Jul-20 20-Jul-20 1,745 FN1 ARS M 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

8 97 M02 [ 158 m2 / 7 har 158 m2 U-045 [ m2 ] Pemasa 1 U-045.1 A.4.4. 0.24 OH Pekerja ( O L.1 37.92 85,000 20,400 3,223,200 Biaya 292,875 20-Jul-20 26-Jul-20 460,457 FN1 ARS M 3 7.0 5
97 M02 [ 158 m2 / 7 har 158 m2 U-045 [ m2 ] Pemasa 2 U-045.2 A.4.4. 0.12 OH Tukang Bat L.3 18.96 100,000 12,000 1,896,000 Biaya 20-Jul-20 26-Jul-20 270,857 FN1 ARS M 1 2
97 M02 [ 158 m2 / 7 har 158 m2 U-045 [ m2 ] Pemasa 3 U-045.3 A.4.4. 0.01 OH Kepala tuka L.9 1.90 150,000 1,800 284,400 Biaya 20-Jul-20 26-Jul-20 40,629 FN1 ARS M 1 2
97 M02 [ 158 m2 / 7 har 158 m2 U-045 [ m2 ] Pemasa 4 U-045.4 A.4.4. 0.01 OH Mandor ( O L.10 1.90 185,000 2,220 350,760 Biaya 20-Jul-20 26-Jul-20 50,109 FN1 ARS M 1 1
97 M02 [ 158 m2 / 7 har 158 m2 U-045 [ m2 ] Pemasa 5 U-045.5 A.4.4. 1.05 Bh Keramik LanM.83 165.90 200,000 210,000 33,180,000 Biaya 20-Jul-20 26-Jul-20 4,740,000 FN1 ARS M - -
97 M02 [ 158 m2 / 7 har 158 m2 U-045 [ m2 ] Pemasa 6 U-045.6 A.4.4. 9.60 kg Semen ( kg M.12 1516.80 1,300 12,480 1,971,840
Biaya Bahan 20-Jul-20 26-Jul-20 281,691 FN1 ARS M - -
97 M02 [ 158 m2 / 7 har 158 m2 U-045 [ m2 ] Pemasa 7 U-045.7 A.4.4. 1.50 Kg Semen WarnM.13 237.00 15,000 22,500 3,555,000
Biaya Bahan 20-Jul-20 26-Jul-20 507,857 FN1 ARS M - -
97 M02 [ 158 m2 / 7 har 158 m2 U-045 [ m2 ] Pemasa 8 U-045.8 A.4.4. 0.05 M3 Pasir Pasan M.9 7.11 255,000 11,475 1,813,050
Biaya Bahan 20-Jul-20 26-Jul-20 259,007 FN1 ARS M - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

8 98 M03 [ 18 m2 / 1 hari 18 m2 U-044 [ m2 ] Pemasa 1 U-044.1 A.4.4. 0.25 OH Pekerja ( O L.1 4.50 85,000 21,250 382,500 Biaya 192,070 26-Jul-20 26-Jul-20 382,500 FN1 ARS M 3 1.0 5
98 M03 [ 18 m2 / 1 hari 18 m2 U-044 [ m2 ] Pemasa 2 U-044.2 A.4.4. 0.13 OH Tukang Bat L.3 2.25 100,000 12,500 225,000 Biaya 26-Jul-20 26-Jul-20 225,000 FN1 ARS M 1 2
98 M03 [ 18 m2 / 1 hari 18 m2 U-044 [ m2 ] Pemasa 3 U-044.3 A.4.4. 0.01 OH Kepala tuka L.9 0.23 150,000 1,950 35,100 Biaya 26-Jul-20 26-Jul-20 35,100 FN1 ARS M 1 2
98 M03 [ 18 m2 / 1 hari 18 m2 U-044 [ m2 ] Pemasa 4 U-044.4 A.4.4. 0.01 OH Mandor ( O L.10 0.23 185,000 2,405 43,290 Biaya 26-Jul-20 26-Jul-20 43,290 FN1 ARS M 1 1
98 M03 [ 18 m2 / 1 hari 18 m2 U-044 [ m2 ] Pemasa 5 U-044.5 A.4.4. 1.05 Bh Keramik LanM.82 18.90 105,000 110,250 1,984,500 Biaya 26-Jul-20 26-Jul-20 1,984,500 FN1 ARS M - -
98 M03 [ 18 m2 / 1 hari 18 m2 U-044 [ m2 ] Pemasa 6 U-044.6 A.4.4. 9.80 kg Semen ( kg M.12 176.40 1,300 12,740 229,320
Biaya Bahan 26-Jul-20 26-Jul-20 229,320 FN1 ARS M - -
98 M03 [ 18 m2 / 1 hari 18 m2 U-044 [ m2 ] Pemasa 7 U-044.7 A.4.4. 1.30 Kg Semen WarnM.13 23.40 15,000 19,500 351,000
Biaya Bahan 26-Jul-20 26-Jul-20 351,000 FN1 ARS M - -
98 M03 [ 18 m2 / 1 hari 18 m2 U-044 [ m2 ] Pemasa 8 U-044.8 A.4.4. 0.05 M3 Pasir Pasan M.9 0.81 255,000 11,475 206,550
Biaya Bahan 26-Jul-20 26-Jul-20 206,550 FN1 ARS M - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

8 99 M04 [ 12,6 m2 / 2 ha 12.6 m2 U-043 [ m2 ] Pemasa 1 U-043.1 A.4.4. 0.70 OH Pekerja ( O L.1 8.82 85,000 59,500 749,700 Biaya 252,950 26-Jul-20 27-Jul-20 374,850 FN1 ARS M 3 2.0 5
99 M04 [ 12,6 m2 / 2 ha 12.6 m2 U-043 [ m2 ] Pemasa 2 U-043.2 A.4.4. 0.35 OH Tukang Bat L.3 4.41 100,000 35,000 441,000 Biaya 26-Jul-20 27-Jul-20 220,500 FN1 ARS M 1 2
99 M04 [ 12,6 m2 / 2 ha 12.6 m2 U-043 [ m2 ] Pemasa 3 U-043.3 A.4.4. 0.04 OH Kepala tuka L.9 0.44 150,000 5,250 66,150 Biaya 26-Jul-20 27-Jul-20 33,075 FN1 ARS M 1 2
99 M04 [ 12,6 m2 / 2 ha 12.6 m2 U-043 [ m2 ] Pemasa 4 U-043.4 A.4.4. 0.04 OH Mandor ( O L.10 0.44 185,000 6,475 81,585 Biaya 26-Jul-20 27-Jul-20 40,793 FN1 ARS M 1 1
99 M04 [ 12,6 m2 / 2 ha 12.6 m2 U-043 [ m2 ] Pemasa 5 U-043.5 A.4.4. 1.05 Bh Keramik LanM.81 13.23 95,000 99,750 1,256,850 Biaya 26-Jul-20 27-Jul-20 628,425 FN1 ARS M - -
99 M04 [ 12,6 m2 / 2 ha 12.6 m2 U-043 [ m2 ] Pemasa 6 U-043.6 A.4.4. 10.00 Kg Semen ( Kg M.12 126.00 1,300 13,000 163,800
Biaya Bahan 26-Jul-20 27-Jul-20 81,900 FN1 ARS M - -
99 M04 [ 12,6 m2 / 2 ha 12.6 m2 U-043 [ m2 ] Pemasa 7 U-043.7 A.4.4. 0.05 M3 Pasir Pasan M.9 0.57 255,000 11,475 144,585
Biaya Bahan 26-Jul-20 27-Jul-20 72,293 FN1 ARS M - -
99 M04 [ 12,6 m2 / 2 ha 12.6 m2 U-043 [ m2 ] Pemasa 8 U-043.8 A.4.4. 1.50 Kg Semen WarnM.13 18.90 15,000 22,500 283,500
Biaya Bahan 26-Jul-20 27-Jul-20 141,750 FN1 ARS M - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

8 100 M05 [ 22 m2 / 4 har 22 m2 U-047 [ m2 ] Pemasa 1 U-047.1 A.4.4. 0.90 OH Pekerja ( O L.1 19.80 85,000 76,500 1,683,000 Biaya 278,255 27-Jul-20 30-Jul-20 420,750 FN1 ARS M 3 4.0 5
100 M05 [ 22 m2 / 4 har 22 m2 U-047 [ m2 ] Pemasa 2 U-047.2 A.4.4. 0.45 OH Tukang Bat L.3 9.90 100,000 45,000 990,000 Biaya 27-Jul-20 30-Jul-20 247,500 FN1 ARS M 1 2
100 M05 [ 22 m2 / 4 har 22 m2 U-047 [ m2 ] Pemasa 3 U-047.3 A.4.4. 0.05 OH Kepala tuka L.9 0.99 150,000 6,750 148,500 Biaya 27-Jul-20 30-Jul-20 37,125 FN1 ARS M 1 2
100 M05 [ 22 m2 / 4 har 22 m2 U-047 [ m2 ] Pemasa 4 U-047.4 A.4.4. 0.05 OH Mandor ( O L.10 0.99 185,000 8,325 183,150 Biaya 27-Jul-20 30-Jul-20 45,788 FN1 ARS M 1 1
100 M05 [ 22 m2 / 4 har 22 m2 U-047 [ m2 ] Pemasa 5 U-047.5 A.4.4. 1.10 m2 Keramik Di M.75 24.20 85,000 93,500 2,057,000 Biaya 27-Jul-20 30-Jul-20 514,250 FN1 ARS M - -
100 M05 [ 22 m2 / 4 har 22 m2 U-047 [ m2 ] Pemasa 6 U-047.6 A.4.4. 9.30 Kg Semen ( Kg M.12 204.60 1,300 12,090 265,980
Biaya Bahan 27-Jul-20 30-Jul-20 66,495 FN1 ARS M - -
100 M05 [ 22 m2 / 4 har 22 m2 U-047 [ m2 ] Pemasa 7 U-047.7 A.4.4. 0.02 M3 Pasir Pasan M.9 0.40 255,000 4,590 100,980
Biaya Bahan 27-Jul-20 30-Jul-20 25,245 FN1 ARS M - -
100 M05 [ 22 m2 / 4 har 22 m2 U-047 [ m2 ] Pemasa 8 U-047.8 A.4.4. 2.10 Kg Semen WarnM.13 46.20 15,000 31,500 693,000
Biaya Bahan 27-Jul-20 30-Jul-20 173,250 FN1 ARS M - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

8 101 M06 [ 110 m1 / 3 har 110 m1 U-054 [ m1 ] Pemasa 1 U-054.1 A.4.4. 0.09 OH Pekerja ( O L.1 9.90 85,000 7,650 841,500 Biaya 43,072 30-Jul-20 01-Aug-20 280,500 FN1 ARS M 3 3.0 5
101 M06 [ 110 m1 / 3 har 110 m1 U-054 [ m1 ] Pemasa 2 U-054.2 A.4.4. 0.09 OH Tukang Bat L.3 9.90 100,000 9,000 990,000 Biaya 30-Jul-20 01-Aug-20 330,000 FN1 ARS M 1 2
101 M06 [ 110 m1 / 3 har 110 m1 U-054 [ m1 ] Pemasa 3 U-054.3 A.4.4. 0.01 OH Kepala tuka L.9 0.99 150,000 1,350 148,500 Biaya 30-Jul-20 01-Aug-20 49,500 FN1 ARS M 1 2
101 M06 [ 110 m1 / 3 har 110 m1 U-054 [ m1 ] Pemasa 4 U-054.4 A.4.4. 0.01 OH Mandor ( O L.10 0.55 185,000 925 101,750 Biaya 30-Jul-20 01-Aug-20 33,917 FN1 ARS M 1 1
101 M06 [ 110 m1 / 3 har 110 m1 U-054 [ m1 ] Pemasa 5 U-054.5 A.4.4. 1.70 Bh Plint Keram M.87 187.00 12,000 20,400 2,244,000 Biaya 30-Jul-20 01-Aug-20 748,000 FN1 ARS M - -
101 M06 [ 110 m1 / 3 har 110 m1 U-054 [ m1 ] Pemasa 6 U-054.6 A.4.4. 1.14 kg Semen ( kg M.12 125.40 1,300 1,482 163,020
Biaya Bahan 30-Jul-20 01-Aug-20 54,340 FN1 ARS M - -
101 M06 [ 110 m1 / 3 har 110 m1 U-054 [ m1 ] Pemasa 7 U-054.7 A.4.4. 0.10 Kg Semen WarnM.13 11.00 15,000 1,500 165,000
Biaya Bahan 30-Jul-20 01-Aug-20 55,000 FN1 ARS M - -
101 M06 [ 110 m1 / 3 har 110 m1 U-054 [ m1 ] Pemasa 8 U-054.8 A.4.4. 0.00 M3 Pasir Pasan M.9 0.33 255,000 765 84,150
Biaya Bahan 30-Jul-20 01-Aug-20 28,050 FN1 ARS M - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

8 102 M07 [ 164 m1 / 3 har 164 m1 U-055 [ m1 ] Pemasa 1 U-055.1 A.4.4. 0.08 OH Pekerja ( O L.1 13.12 85,000 6,800 1,115,200 Biaya 32,935 1-Aug-20 03-Aug-20 371,733 FN1 ARS M 3 3.0 5
102 M07 [ 164 m1 / 3 har 164 m1 U-055 [ m1 ] Pemasa 2 U-055.2 A.4.4. 0.08 OH Tukang Bat L.3 13.12 100,000 8,000 1,312,000 Biaya 1-Aug-20 03-Aug-20 437,333 FN1 ARS M 1 2
102 M07 [ 164 m1 / 3 har 164 m1 U-055 [ m1 ] Pemasa 3 U-055.3 A.4.4. 0.01 OH Kepala tuka L.9 1.31 150,000 1,200 196,800 Biaya 1-Aug-20 03-Aug-20 65,600 FN1 ARS M 1 2
102 M07 [ 164 m1 / 3 har 164 m1 U-055 [ m1 ] Pemasa 4 U-055.4 A.4.4. 0.00 OH Mandor ( O L.10 0.66 185,000 740 121,360 Biaya 1-Aug-20 03-Aug-20 40,453 FN1 ARS M 1 1
102 M07 [ 164 m1 / 3 har 164 m1 U-055 [ m1 ] Pemasa 5 U-055.5 A.4.4. 5.00 bh Ballnose RoM.74 820.00 2,500 12,500 2,050,000 Biaya 1-Aug-20 03-Aug-20 683,333 FN1 ARS M - -
102 M07 [ 164 m1 / 3 har 164 m1 U-055 [ m1 ] Pemasa 6 U-055.6 A.4.4. 1.10 kg Semen ( kg M.12 180.40 1,300 1,430 234,520
Biaya Bahan 1-Aug-20 03-Aug-20 78,173 FN1 ARS M - -
102 M07 [ 164 m1 / 3 har 164 m1 U-055 [ m1 ] Pemasa 7 U-055.7 A.4.4. 0.10 Kg Semen WarnM.13 16.40 15,000 1,500 246,000
Biaya Bahan 1-Aug-20 03-Aug-20 82,000 FN1 ARS M - -
102 M07 [ 164 m1 / 3 har 164 m1 U-055 [ m1 ] Pemasa 8 U-055.8 A.4.4. 0.00 M3 Pasir Pasan M.9 0.49 255,000 765 125,460
Biaya Bahan 1-Aug-20 03-Aug-20 41,820 FN1 ARS M - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

9 103 N01 [ 126 m2 / 10 ha 126 m2 U-072 [ m2 ] Pek. r 1 U-072.1 A.4.2. 0.35 OH Pekerja ( O L.1 44.10 85,000 29,750 3,748,500 Biaya 132,580 20-Jul-20 29-Jul-20 374,850 FN1 ARS N 3 10.0 5
103 N01 [ 126 m2 / 10 ha 126 m2 U-072 [ m2 ] Pek. r 2 U-072.2 A.4.2. 0.35 OH Tukang Bes L.4 44.10 100,000 35,000 4,410,000 Biaya 20-Jul-20 29-Jul-20 441,000 FN1 ARS N 1 2
103 N01 [ 126 m2 / 10 ha 126 m2 U-072 [ m2 ] Pek. r 3 U-072.3 A.4.2. 0.04 OH Kepala Tuk L.9 4.41 150,000 5,250 661,500 Biaya 20-Jul-20 29-Jul-20 66,150 FN1 ARS N 1 2
103 N01 [ 126 m2 / 10 ha 126 m2 U-072 [ m2 ] Pek. r 4 U-072.4 A.4.2. 0.02 OH Mandor ( O L.10 2.27 185,000 3,330 419,580 Biaya 20-Jul-20 29-Jul-20 41,958 FN1 ARS N 1 1
103 N01 [ 126 m2 / 10 ha 126 m2 U-072 [ m2 ] Pek. r 5 U-072.5 A.4.2. 3.50 M1 Hollow 4/4 M.26 441.00 7,000 24,500 3,087,000 Biaya 20-Jul-20 29-Jul-20 308,700 FN1 ARS N - -
103 N01 [ 126 m2 / 10 ha 126 m2 U-072 [ m2 ] Pek. r 6 U-072.6 A.4.2. 1.75 M1 Hollow 2/4 M.24 220.50 5,000 8,750 1,102,500
Biaya Bahan 20-Jul-20 29-Jul-20 110,250 FN1 ARS N - -
103 N01 [ 126 m2 / 10 ha 126 m2 U-072 [ m2 ] Pek. r 7 U-072.7 A.4.2. 2.00 bh Suspension M.116 252.00 6,000 12,000 1,512,000
Biaya Bahan 20-Jul-20 29-Jul-20 151,200 FN1 ARS N - -
103 N01 [ 126 m2 / 10 ha 126 m2 U-072 [ m2 ] Pek. r 8 U-072.8 A.4.2. 18.00 bh Screw ( bh M.113 2268.00 500 9,000 1,134,000
Biaya Bahan 20-Jul-20 29-Jul-20 113,400 FN1 ARS N - -
103 N01 [ 126 m2 / 10 ha 126 m2 U-072 [ m2 ] Pek. r 9 U-072.9 A.4.2. 0.02 Ls Perlengkap A.4 2.52 250,000 5,000 630,000Biaya Alat 20-Jul-20 29-Jul-20 63,000 FN1 ARS N - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 104 N02 [ 126 m2 / 3 har 126 m2 U-073 [ m2 ] Pemasa 1 U-073.1 A.4.5. 0.10 OH Pekerja ( O L.1 12.60 85,000 8,500 1,071,000 Biaya 46,926 29-Jul-20 31-Jul-20 357,000 FN1 ARS N 3 3.0 5
104 N02 [ 126 m2 / 3 har 126 m2 U-073 [ m2 ] Pemasa 2 U-073.2 A.4.5. 0.05 OH Tukang kay L.6 6.30 100,000 5,000 630,000 Biaya 29-Jul-20 31-Jul-20 210,000 FN1 ARS N 1 2
104 N02 [ 126 m2 / 3 har 126 m2 U-073 [ m2 ] Pemasa 3 U-073.3 A.4.5. 0.01 OH Kepala tuka L.9 0.63 150,000 750 94,500 Biaya 29-Jul-20 31-Jul-20 31,500 FN1 ARS N 1 2
104 N02 [ 126 m2 / 3 har 126 m2 U-073 [ m2 ] Pemasa 4 U-073.4 A.4.5. 0.01 OH Mandor ( O L.10 0.63 185,000 925 116,550 Biaya 29-Jul-20 31-Jul-20 38,850 FN1 ARS N 1 1
104 N02 [ 126 m2 / 3 har 126 m2 U-073 [ m2 ] Pemasa 5 U-073.5 A.4.5. 0.36 Lbr Gypsum boaM.56 45.86 87,000 31,668 3,990,168 Biaya 29-Jul-20 31-Jul-20 1,330,056 FN1 ARS N - -
104 N02 [ 126 m2 / 3 har 126 m2 U-073 [ m2 ] Pemasa 6 U-073.6 A.4.5. 0.11 kg Paku sekrupM.112 13.86 750 83 10,395
Biaya Bahan 29-Jul-20 31-Jul-20 3,465 FN1 ARS N - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 105 N03 [ 46 m1 / 1 hari 46 m1 U-075 [ m1 ] Pemasang1 U-075.1 A.4.5. 0.05 OH Pekerja ( O L.1 2.30 85,000 4,250 195,500 Biaya 13,819 31-Jul-20 31-Jul-20 195,500 FN1 ARS N 3 1.0 5
105 N03 [ 46 m1 / 1 hari 46 m1 U-075 [ m1 ] Pemasang2 U-075.2 A.4.5. 0.05 OH Tukang Kay L.6 2.30 100,000 5,000 230,000 Biaya 31-Jul-20 31-Jul-20 230,000 FN1 ARS N 1 2
105 N03 [ 46 m1 / 1 hari 46 m1 U-075 [ m1 ] Pemasang3 U-075.3 A.4.5. 0.01 OH Kepala tuka L.9 0.23 150,000 750 34,500 Biaya 31-Jul-20 31-Jul-20 34,500 FN1 ARS N 1 2
105 N03 [ 46 m1 / 1 hari 46 m1 U-075 [ m1 ] Pemasang4 U-075.4 A.4.5. 0.00 OH Mandor ( O L.10 0.14 185,000 555 25,530 Biaya 31-Jul-20 31-Jul-20 25,530 FN1 ARS N 1 1
105 N03 [ 46 m1 / 1 hari 46 m1 U-075 [ m1 ] Pemasang5 U-075.5 A.4.5. 1.05 m List kayu prM.140 48.30 2,870 3,014 138,621 Biaya 31-Jul-20 31-Jul-20 138,621 FN1 ARS N - -
105 N03 [ 46 m1 / 1 hari 46 m1 U-075 [ m1 ] Pemasang6 U-075.6 A.4.5. 0.01 kg Paku Biasa 2M.111 0.46 25,000 250 11,500
Biaya Bahan 31-Jul-20 31-Jul-20 11,500 FN1 ARS N - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 106 O01 [ 134 m2 / 2 hari 134 m2 U-114 [ m2 ] Pekerja 1 U-114.1 AK-I. 0.10 kg Plamir ( kg M.11 13.40 12,000 1,200 160,800 Biaya 11-Jul-20 12-Jul-20 80,400 FN1 ARS O - 2.0 -
106 O01 [ 134 m2 / 2 hari 134 m2 U-114 [ m2 ] Pekerja 2 U-114.2 AK-I. 0.50 Lbr Amplas ( LbM.134 67.00 3,500 1,750 234,500 Biaya 11-Jul-20 12-Jul-20 117,250 FN1 ARS O - -
106 O01 [ 134 m2 / 2 hari 134 m2 U-114 [ m2 ] Pekerja 3 U-114.3 AK-I. 0.02 oh Pekerja ( oh L.1 2.68 85,000 1,700 227,800 Biaya 15,000 11-Jul-20 12-Jul-20 113,900 FN1 ARS O 3 5
106 O01 [ 134 m2 / 2 hari 134 m2 U-114 [ m2 ] Pekerja 4 U-114.4 AK-I. 0.07 oh Tukang Cat L.5 9.38 100,000 7,000 938,000 Biaya 11-Jul-20 12-Jul-20 469,000 FN1 ARS O 1 2
106 O01 [ 134 m2 / 2 hari 134 m2 U-114 [ m2 ] Pekerja 5 U-114.5 AK-I. 0.01 oh Kepala Tuka L.9 1.34 150,000 1,500 201,000 Biaya 11-Jul-20 12-Jul-20 100,500 FN1 ARS O 1 2
106 O01 [ 134 m2 / 2 hari 134 m2 U-114 [ m2 ] Pekerja 6 U-114.6 AK-I. 0.01 oh Mandor ( oh L.10 1.34 185,000 1,850 247,900
Biaya Upah 11-Jul-20 12-Jul-20 123,950 FN1 ARS O 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

7 107 O02 [ 176 m2 / 2 har 176 m2 U-115 [ m2 ] Pekerj 1 U-115.1 AK-I. 0.10 kg Cat WaterprM.68 17.60 50,000 5,000 880,000 Biaya 10-Jul-20 11-Jul-20 440,000 FN1 ARS O - 2.0 -
107 O02 [ 176 m2 / 2 har 176 m2 U-115 [ m2 ] Pekerj 2 U-115.2 AK-I. 0.50 Lbr Amplas ( LbM.134 88.00 3,500 1,750 308,000 Biaya 10-Jul-20 11-Jul-20 154,000 FN1 ARS O - -
107 O02 [ 176 m2 / 2 har 176 m2 U-115 [ m2 ] Pekerj 3 U-115.3 AK-I. 0.01 ea Rol Cat ( eaM.143 1.76 25,000 250 44,000 Biaya 10-Jul-20 11-Jul-20 22,000 FN1 ARS O - -
107 O02 [ 176 m2 / 2 har 176 m2 U-115 [ m2 ] Pekerj 4 U-115.4 AK-I. 0.02 oh Pekerja ( oh L.1 3.52 85,000 1,700 299,200 Biaya 19,050 10-Jul-20 11-Jul-20 149,600 FN1 ARS O 3 5
107 O02 [ 176 m2 / 2 har 176 m2 U-115 [ m2 ] Pekerj 5 U-115.5 AK-I. 0.07 oh Tukang Cat L.5 12.32 100,000 7,000 1,232,000 Biaya 10-Jul-20 11-Jul-20 616,000 FN1 ARS O 1 2
107 O02 [ 176 m2 / 2 har 176 m2 U-115 [ m2 ] Pekerj 6 U-115.6 AK-I. 0.01 oh Kepala Tuka L.9 1.76 150,000 1,500 264,000
Biaya Upah 10-Jul-20 11-Jul-20 132,000 FN1 ARS O 1 2
107 O02 [ 176 m2 / 2 har 176 m2 U-115 [ m2 ] Pekerj 7 U-115.7 AK-I. 0.01 oh Mandor ( oh L.10 1.76 185,000 1,850 325,600
Biaya Upah 10-Jul-20 11-Jul-20 162,800 FN1 ARS O 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

7 108 O03 [ 256 m2 / 3 har 256 m2 U-117 [ m2 ] Pengecat 1 U-117.1 A.4.7. 0.02 OH Pekerja ( O L.1 5.12 85,000 1,700 435,200 Biaya 20,869 9-Jul-20 11-Jul-20 145,067 FN1 ARS O 3 3.0 5
108 O03 [ 256 m2 / 3 har 256 m2 U-117 [ m2 ] Pengecat 2 U-117.2 A.4.7. 0.06 OH Tukang cat L.5 16.13 100,000 6,300 1,612,800 Biaya 9-Jul-20 11-Jul-20 537,600 FN1 ARS O 1 2
108 O03 [ 256 m2 / 3 har 256 m2 U-117 [ m2 ] Pengecat 3 U-117.3 A.4.7. 0.01 OH Kepala tuka L.9 1.61 150,000 945 241,920 Biaya 9-Jul-20 11-Jul-20 80,640 FN1 ARS O 1 2
108 O03 [ 256 m2 / 3 har 256 m2 U-117 [ m2 ] Pengecat 4 U-117.4 A.4.7. 0.00 OH Mandor ( O L.10 0.77 185,000 555 142,080 Biaya 9-Jul-20 11-Jul-20 47,360 FN1 ARS O 1 1
108 O03 [ 256 m2 / 3 har 256 m2 U-117 [ m2 ] Pengecat 5 U-117.5 A.4.7. 0.10 Kg Plamir ( Kg M.11 25.60 12,000 1,200 307,200 Biaya 9-Jul-20 11-Jul-20 102,400 FN1 ARS O - -
108 O03 [ 256 m2 / 3 har 256 m2 U-117 [ m2 ] Pengecat 6 U-117.6 A.4.7. 0.10 Kg Cat Dasar T M.63 25.60 39,286 3,929 1,005,714
Biaya Bahan 9-Jul-20 11-Jul-20 335,238 FN1 ARS O - -
108 O03 [ 256 m2 / 3 har 256 m2 U-117 [ m2 ] Pengecat 7 U-117.7 A.4.7. 0.26 Kg Cat Tembok M.65 66.56 24,000 6,240 1,597,440
Biaya Bahan 9-Jul-20 11-Jul-20 532,480 FN1 ARS O - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

7 109 O04 [ 134 m2 / 2 hari 134 m2 U-116 [ m2 ] Pengecat 1 U-116.1 A.4.7. 0.02 OH Pekerja ( O L.1 2.68 85,000 1,700 227,800 Biaya 18,519 9-Jul-20 10-Jul-20 113,900 FN1 ARS O 3 2.0 5
109 O04 [ 134 m2 / 2 hari 134 m2 U-116 [ m2 ] Pengecat 2 U-116.2 A.4.7. 0.06 OH Tukang cat L.5 8.44 100,000 6,300 844,200 Biaya 9-Jul-20 10-Jul-20 422,100 FN1 ARS O 1 2
109 O04 [ 134 m2 / 2 hari 134 m2 U-116 [ m2 ] Pengecat 3 U-116.3 A.4.7. 0.01 OH Kepala tuka L.9 0.84 150,000 945 126,630 Biaya 9-Jul-20 10-Jul-20 63,315 FN1 ARS O 1 2
109 O04 [ 134 m2 / 2 hari 134 m2 U-116 [ m2 ] Pengecat 4 U-116.4 A.4.7. 0.00 OH Mandor ( O L.10 0.40 185,000 555 74,370 Biaya 9-Jul-20 10-Jul-20 37,185 FN1 ARS O 1 1
109 O04 [ 134 m2 / 2 hari 134 m2 U-116 [ m2 ] Pengecat 5 U-116.5 A.4.7. 0.10 Kg Plamir ( Kg M.11 13.40 12,000 1,200 160,800 Biaya 9-Jul-20 10-Jul-20 80,400 FN1 ARS O - -
109 O04 [ 134 m2 / 2 hari 134 m2 U-116 [ m2 ] Pengecat 6 U-116.6 A.4.7. 0.10 Kg Cat Dasar T M.64 13.40 26,190 2,619 350,952
Biaya Bahan 9-Jul-20 10-Jul-20 175,476 FN1 ARS O - -
109 O04 [ 134 m2 / 2 hari 134 m2 U-116 [ m2 ] Pengecat 7 U-116.7 A.4.7. 0.26 Kg Cat Tembok M.66 34.84 20,000 5,200 696,800
Biaya Bahan 9-Jul-20 10-Jul-20 348,400 FN1 ARS O - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 110 O05 [ 258 m2 / 3 har 258 m2 U-118 [ m2 ] Pengecat 1 U-118.1 A.4.7. 0.02 OH Pekerja ( O L.1 5.16 85,000 1,700 438,600 Biaya 19,150 1-Aug-20 03-Aug-20 146,200 FN1 ARS O 3 3.0 5
110 O05 [ 258 m2 / 3 har 258 m2 U-118 [ m2 ] Pengecat 2 U-118.2 A.4.7. 0.06 OH Tukang cat L.5 16.25 100,000 6,300 1,625,400 Biaya 1-Aug-20 03-Aug-20 541,800 FN1 ARS O 1 2
110 O05 [ 258 m2 / 3 har 258 m2 U-118 [ m2 ] Pengecat 3 U-118.3 A.4.7. 0.01 OH Kepala tuka L.9 1.63 150,000 945 243,810 Biaya 1-Aug-20 03-Aug-20 81,270 FN1 ARS O 1 2
110 O05 [ 258 m2 / 3 har 258 m2 U-118 [ m2 ] Pengecat 4 U-118.4 A.4.7. 0.00 OH Mandor ( O L.10 0.77 185,000 555 143,190 Biaya 1-Aug-20 03-Aug-20 47,730 FN1 ARS O 1 1
110 O05 [ 258 m2 / 3 har 258 m2 U-118 [ m2 ] Pengecat 5 U-118.5 A.4.7. 0.10 Kg Plamir ( Kg M.11 25.80 12,000 1,200 309,600 Biaya 1-Aug-20 03-Aug-20 103,200 FN1 ARS O - -
110 O05 [ 258 m2 / 3 har 258 m2 U-118 [ m2 ] Pengecat 6 U-118.6 A.4.7. 0.26 Kg Cat Plafon M.67 67.08 32,500 8,450 2,180,100
Biaya Bahan 1-Aug-20 03-Aug-20 726,700 FN1 ARS O - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

### 111 O06 [ 22 m2 / 1 hari 22 m2 U-120 [ m2 ] Pengeca 1 U-120.1 A.4.7. 0.07 OH Pekerja ( O L.1 1.54 85,000 5,950 130,900 Biaya 42,685 1-Aug-20 01-Aug-20 130,900 FN1 ARS O 3 1.0 5
111 O06 [ 22 m2 / 1 hari 22 m2 U-120 [ m2 ] Pengeca 2 U-120.2 A.4.7. 0.01 OH Tukang cat L.5 0.20 100,000 900 19,800 Biaya 1-Aug-20 01-Aug-20 19,800 FN1 ARS O 1 2
111 O06 [ 22 m2 / 1 hari 22 m2 U-120 [ m2 ] Pengeca 3 U-120.3 A.4.7. 0.01 OH Kepala tuka L.9 0.13 150,000 900 19,800 Biaya 1-Aug-20 01-Aug-20 19,800 FN1 ARS O 1 2
111 O06 [ 22 m2 / 1 hari 22 m2 U-120 [ m2 ] Pengeca 4 U-120.4 A.4.7. 0.00 OH Mandor ( O L.10 0.07 185,000 555 12,210 Biaya 1-Aug-20 01-Aug-20 12,210 FN1 ARS O 1 1
111 O06 [ 22 m2 / 1 hari 22 m2 U-120 [ m2 ] Pengeca 5 U-120.5 A.4.7. 0.20 Kg Cat meni ( M.69 4.40 16,300 3,260 71,720 Biaya 1-Aug-20 01-Aug-20 71,720 FN1 ARS O - -
111 O06 [ 22 m2 / 1 hari 22 m2 U-120 [ m2 ] Pengeca 6 U-120.6 A.4.7. 0.15 Kg Plamir ( Kg M.11 3.30 12,000 1,800 39,600
Biaya Bahan 1-Aug-20 01-Aug-20 39,600 FN1 ARS O - -
111 O06 [ 22 m2 / 1 hari 22 m2 U-120 [ m2 ] Pengeca 7 U-120.7 A.4.7. 0.17 Kg Cat Dasar KM.71 3.74 65,000 11,050 243,100
Biaya Bahan 1-Aug-20 01-Aug-20 243,100 FN1 ARS O - -
111 O06 [ 22 m2 / 1 hari 22 m2 U-120 [ m2 ] Pengeca 8 U-120.8 A.4.7. 0.26 Kg Cat kayu ( M.72 5.72 60,000 15,600 343,200
Biaya Bahan 1-Aug-20 01-Aug-20 343,200 FN1 ARS O - -
111 O06 [ 22 m2 / 1 hari 22 m2 U-120 [ m2 ] Pengeca 9 U-120.9 A.4.7. 0.01 Bh Kuas ( Bh )M.138 0.22 17,000 170 3,740
Biaya Bahan 1-Aug-20 01-Aug-20 3,740 FN1 ARS O - -
111 O06 [ 22 m2 / 1 hari 22 m2 U-120 [ m2 ] Pengeca 10 U-120.10 A.4.7. 0.03 Ltr Tinner ( Ltr M.73 0.66 60,000 1,800 39,600
Biaya Bahan 1-Aug-20 01-Aug-20 39,600 FN1 ARS O - -
111 O06 [ 22 m2 / 1 hari 22 m2 U-120 [ m2 ] Pengeca 11 U-120.11 A.4.7. 0.20 Lbr Amplas ( LbM.134 4.40 3,500 700 15,400
Biaya Bahan 1-Aug-20 01-Aug-20 15,400 FN1 ARS O - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 112 O07 [ 16 m2 / 1 hari 16 m2 U-119 [ m2 ] Pengeca 1 U-119.1 A.4.7. 0.02 OH Pekerja ( O L.1 0.32 85,000 1,700 27,200 Biaya 30,133 30-Jul-20 30-Jul-20 27,200 FN1 ARS O 3 1.0 5
112 O07 [ 16 m2 / 1 hari 16 m2 U-119 [ m2 ] Pengeca 2 U-119.2 A.4.7. 0.20 OH Tukang cat L.5 3.20 100,000 20,000 320,000 Biaya 30-Jul-20 30-Jul-20 320,000 FN1 ARS O 1 2
112 O07 [ 16 m2 / 1 hari 16 m2 U-119 [ m2 ] Pengeca 3 U-119.3 A.4.7. 0.02 OH Kepala tuka L.9 0.32 150,000 3,000 48,000 Biaya 30-Jul-20 30-Jul-20 48,000 FN1 ARS O 1 2
112 O07 [ 16 m2 / 1 hari 16 m2 U-119 [ m2 ] Pengeca 4 U-119.4 A.4.7. 0.00 OH Mandor ( O L.10 0.04 185,000 463 7,400 Biaya 30-Jul-20 30-Jul-20 7,400 FN1 ARS O 1 1
112 O07 [ 16 m2 / 1 hari 16 m2 U-119 [ m2 ] Pengeca 5 U-119.5 A.4.7. 0.10 Kg Cat Besi ( M.70 1.60 48,000 4,800 76,800 Biaya 30-Jul-20 30-Jul-20 76,800 FN1 ARS O - -
112 O07 [ 16 m2 / 1 hari 16 m2 U-119 [ m2 ] Pengeca 6 U-119.6 A.4.7. 0.01 Bh Kuas ( Bh )M.138 0.16 17,000 170 2,720
Biaya Bahan 30-Jul-20 30-Jul-20 2,720 FN1 ARS O - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 113 P01 [ 162,8 kg / 1 h 162.72 kg U-033 [ kg ] Pembesia 1 U-033.1 A.4.1. 0.01 OH Pekerja ( O L.1 1.14 85,000 595 96,820 Biaya 12,327 19-Jun-20 19-Jun-20 96,820 FN2 ARS P 3 1.0 5
113 P01 [ 162,8 kg / 1 h 162.72 kg U-033 [ kg ] Pembesia 2 U-033.2 A.4.1. 0.01 OH Tukang Bes L.4 1.14 100,000 700 113,906 Biaya 19-Jun-20 19-Jun-20 113,906 FN2 ARS P 1 2
113 P01 [ 162,8 kg / 1 h 162.72 kg U-033 [ kg ] Pembesia 3 U-033.3 A.4.1. 0.00 OH Kepala Tuk L.9 0.11 150,000 105 17,086 Biaya 19-Jun-20 19-Jun-20 17,086 FN2 ARS P 1 2
113 P01 [ 162,8 kg / 1 h 162.72 kg U-033 [ kg ] Pembesia 4 U-033.4 A.4.1. 0.00 OH Mandor ( O L.10 0.07 185,000 74 12,041 Biaya 19-Jun-20 19-Jun-20 12,041 FN2 ARS P 1 1
113 P01 [ 162,8 kg / 1 h 162.72 kg U-033 [ kg ] Pembesia 5 U-033.5 A.4.1. 1.05 kg Besi beton ( M.16 170.86 10,000 10,500 1,708,587 Biaya 19-Jun-20 19-Jun-20 1,708,587 FN2 ARS P - -
113 P01 [ 162,8 kg / 1 h 162.72 kg U-033 [ kg ] Pembesia 6 U-033.6 A.4.1. 0.02 kg Kawat betonM.27 2.44 23,500 353 57,360
Biaya Bahan 19-Jun-20 19-Jun-20 57,360 FN2 ARS P - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

### 114 P02 [ 14,2 m2 / 2 har 14.127 m2 U-040 [ m2 ] (K3) Pe 1 U-040.1 A.4.1. 0.66 OH Pekerja ( O L.1 9.32 85,000 56,100 792,512 Biaya 343,768 19-Jun-20 20-Jun-20 396,256 FN2 ARS P 3 2.0 5
114 P02 [ 14,2 m2 / 2 har 14.127 m2 U-040 [ m2 ] (K3) Pe 2 U-040.2 A.4.1. 0.33 OH Tukang Kay L.6 4.66 100,000 33,000 466,184 Biaya 19-Jun-20 20-Jun-20 233,092 FN2 ARS P 1 2
114 P02 [ 14,2 m2 / 2 har 14.127 m2 U-040 [ m2 ] (K3) Pe 3 U-040.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.47 150,000 4,950 69,928 Biaya 19-Jun-20 20-Jun-20 34,964 FN2 ARS P 1 2
114 P02 [ 14,2 m2 / 2 har 14.127 m2 U-040 [ m2 ] (K3) Pe 4 U-040.4 A.4.1. 0.03 OH Mandor ( O L.10 0.47 185,000 6,105 86,244 Biaya 19-Jun-20 20-Jun-20 43,122 FN2 ARS P 1 1
114 P02 [ 14,2 m2 / 2 har 14.127 m2 U-040 [ m2 ] (K3) Pe 5 U-040.5 A.4.1. 0.03 m3 Papan KayuM.107 0.42 2,300,000 69,000 974,747 Biaya 19-Jun-20 20-Jun-20 487,374 FN2 ARS P - -
114 P02 [ 14,2 m2 / 2 har 14.127 m2 U-040 [ m2 ] (K3) Pe 6 U-040.6 A.4.1. 0.40 kg Paku Biasa 2M.111 5.65 25,000 10,000 141,268
Biaya Bahan 19-Jun-20 20-Jun-20 70,634 FN2 ARS P - -
114 P02 [ 14,2 m2 / 2 har 14.127 m2 U-040 [ m2 ] (K3) Pe 7 U-040.7 A.4.1. 0.15 Ltr Minyak bekiM.141 2.12 45,750 6,863 96,945
Biaya Bahan 19-Jun-20 20-Jun-20 48,472 FN2 ARS P - -
114 P02 [ 14,2 m2 / 2 har 14.127 m2 U-040 [ m2 ] (K3) Pe 8 U-040.8 A.4.1. 0.02 m3 Balok Kayu M.98 0.21 3,100,000 46,500 656,895
Biaya Bahan 19-Jun-20 20-Jun-20 328,447 FN2 ARS P - -
114 P02 [ 14,2 m2 / 2 har 14.127 m2 U-040 [ m2 ] (K3) Pe 9 U-040.9 A.4.1. 0.35 Lbr Plywood 120M.60 4.94 175,000 61,250 865,265
Biaya Bahan 19-Jun-20 20-Jun-20 432,632 FN2 ARS P - -
114 P02 [ 14,2 m2 / 2 har 14.127 m2 U-040 [ m2 ] (K3) Pe 10 U-040.10 A.4.1. 2.00 btg Dolken kayuM.104 28.25 25,000 50,000 706,339
Biaya Bahan 19-Jun-20 20-Jun-20 353,169 FN2 ARS P - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

8 115 P03 [ 3,2 m3 / 1 har 3.1961 m3 U-027 [ m3 ] Membua 1 U-027.1 A.4.1. 1.65 OH Pekerja ( O L.1 5.27 85,000 140,250 448,257 Biaya 975,620 20-Jun-20 20-Jun-20 448,257 FN2 ARS P 3 1.0 5
115 P03 [ 3,2 m3 / 1 har 3.1961 m3 U-027 [ m3 ] Membua 2 U-027.2 A.4.1. 0.28 OH Tukang Bat L.3 0.88 100,000 27,500 87,894 Biaya 20-Jun-20 20-Jun-20 87,894 FN2 ARS P 1 2
115 P03 [ 3,2 m3 / 1 har 3.1961 m3 U-027 [ m3 ] Membua 3 U-027.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.09 150,000 4,200 13,424 Biaya 20-Jun-20 20-Jun-20 13,424 FN2 ARS P 1 2
115 P03 [ 3,2 m3 / 1 har 3.1961 m3 U-027 [ m3 ] Membua 4 U-027.4 A.4.1. 0.08 OH Mandor ( O L.10 0.27 185,000 15,355 49,077 Biaya 20-Jun-20 20-Jun-20 49,077 FN2 ARS P 1 1
115 P03 [ 3,2 m3 / 1 har 3.1961 m3 U-027 [ m3 ] Membua 5 U-027.5 A.4.1. 371.00 kg Semen ( kg M.12 1185.76 1,300 482,300 1,541,493 Biaya 20-Jun-20 20-Jun-20 1,541,493 FN2 ARS P - -
115 P03 [ 3,2 m3 / 1 har 3.1961 m3 U-027 [ m3 ] Membua 6 U-027.6 A.4.1. 0.50 m3 Pasir Beton M.8 1.59 250,000 124,643 398,375
Biaya Bahan 20-Jun-20 20-Jun-20 398,375 FN2 ARS P - -
115 P03 [ 3,2 m3 / 1 har 3.1961 m3 U-027 [ m3 ] Membua 7 U-027.7 A.4.1. 0.78 m3 Kerikil ( m3 M.7 2.48 220,000 170,622 545,331
Biaya Bahan 20-Jun-20 20-Jun-20 545,331 FN2 ARS P - -
115 P03 [ 3,2 m3 / 1 har 3.1961 m3 U-027 [ m3 ] Membua 8 U-027.8 A.4.1. 215.00 Ltr Air ( Ltr ) M.1 687.17 50 10,750 34,358
Biaya Bahan 20-Jun-20 20-Jun-20 34,358 FN2 ARS P - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 116 P04 [ 14 m2 / 1 hari 13.929 m2 U-019 [ m2 ] Pemasan 1 U-019.1 A.4.4. 0.30 OH Pekerja ( O L.1 4.18 85,000 25,500 355,199 Biaya 58,894 20-Jun-20 20-Jun-20 355,199 FN2 ARS P 3 1.0 5
116 P04 [ 14 m2 / 1 hari 13.929 m2 U-019 [ m2 ] Pemasan 2 U-019.2 A.4.4. 0.15 OH Tukang Bat L.3 2.09 100,000 15,000 208,940 Biaya 20-Jun-20 20-Jun-20 208,940 FN2 ARS P 1 2
116 P04 [ 14 m2 / 1 hari 13.929 m2 U-019 [ m2 ] Pemasan 3 U-019.3 A.4.4. 0.02 OH Kepala Tuk L.9 0.21 150,000 2,250 31,341 Biaya 20-Jun-20 20-Jun-20 31,341 FN2 ARS P 1 2
116 P04 [ 14 m2 / 1 hari 13.929 m2 U-019 [ m2 ] Pemasan 4 U-019.4 A.4.4. 0.02 OH Mandor ( O L.10 0.21 185,000 2,775 38,654 Biaya 20-Jun-20 20-Jun-20 38,654 FN2 ARS P 1 1
116 P04 [ 14 m2 / 1 hari 13.929 m2 U-019 [ m2 ] Pemasan 5 U-019.5 A.4.4. 5.18 Kg Semen ( Kg M.12 72.21 1,300 6,739 93,873 Biaya 20-Jun-20 20-Jun-20 93,873 FN2 ARS P - -
116 P04 [ 14 m2 / 1 hari 13.929 m2 U-019 [ m2 ] Pemasan 6 U-019.6 A.4.4. 0.03 m3 Pasir Pasan M.9 0.36 255,000 6,630 92,352
Biaya Bahan 20-Jun-20 20-Jun-20 92,352 FN2 ARS P - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

8 117 P05 [ 12,4 m2 / 1 ha 12.35 m2 U-044 [ m2 ] Pemasa 1 U-044.1 A.4.4. 0.25 OH Pekerja ( O L.1 3.09 85,000 21,250 262,438 Biaya 192,070 20-Jun-20 20-Jun-20 262,438 FN2 ARS P 3 1.0 5
117 P05 [ 12,4 m2 / 1 ha 12.35 m2 U-044 [ m2 ] Pemasa 2 U-044.2 A.4.4. 0.13 OH Tukang Bat L.3 1.54 100,000 12,500 154,375 Biaya 20-Jun-20 20-Jun-20 154,375 FN2 ARS P 1 2
117 P05 [ 12,4 m2 / 1 ha 12.35 m2 U-044 [ m2 ] Pemasa 3 U-044.3 A.4.4. 0.01 OH Kepala tuka L.9 0.16 150,000 1,950 24,083 Biaya 20-Jun-20 20-Jun-20 24,083 FN2 ARS P 1 2
117 P05 [ 12,4 m2 / 1 ha 12.35 m2 U-044 [ m2 ] Pemasa 4 U-044.4 A.4.4. 0.01 OH Mandor ( O L.10 0.16 185,000 2,405 29,702 Biaya 20-Jun-20 20-Jun-20 29,702 FN2 ARS P 1 1
117 P05 [ 12,4 m2 / 1 ha 12.35 m2 U-044 [ m2 ] Pemasa 5 U-044.5 A.4.4. 1.05 Bh Keramik LanM.82 12.97 105,000 110,250 1,361,588 Biaya 20-Jun-20 20-Jun-20 1,361,588 FN2 ARS P - -
117 P05 [ 12,4 m2 / 1 ha 12.35 m2 U-044 [ m2 ] Pemasa 6 U-044.6 A.4.4. 9.80 kg Semen ( kg M.12 121.03 1,300 12,740 157,339
Biaya Bahan 20-Jun-20 20-Jun-20 157,339 FN2 ARS P - -
117 P05 [ 12,4 m2 / 1 ha 12.35 m2 U-044 [ m2 ] Pemasa 7 U-044.7 A.4.4. 1.30 Kg Semen WarnM.13 16.06 15,000 19,500 240,825
Biaya Bahan 20-Jun-20 20-Jun-20 240,825 FN2 ARS P - -
117 P05 [ 12,4 m2 / 1 ha 12.35 m2 U-044 [ m2 ] Pemasa 8 U-044.8 A.4.4. 0.05 M3 Pasir Pasan M.9 0.56 255,000 11,475 141,716
Biaya Bahan 20-Jun-20 20-Jun-20 141,716 FN2 ARS P - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

8 118 P06 [ 25 m1 / 1 hari 25 m1 U-055 [ m1 ] Pemasa 1 U-055.1 A.4.4. 0.08 OH Pekerja ( O L.1 2.00 85,000 6,800 170,000 Biaya 32,935 20-Jun-20 20-Jun-20 170,000 FN2 ARS P 3 1.0 5
118 P06 [ 25 m1 / 1 hari 25 m1 U-055 [ m1 ] Pemasa 2 U-055.2 A.4.4. 0.08 OH Tukang Bat L.3 2.00 100,000 8,000 200,000 Biaya 20-Jun-20 20-Jun-20 200,000 FN2 ARS P 1 2
118 P06 [ 25 m1 / 1 hari 25 m1 U-055 [ m1 ] Pemasa 3 U-055.3 A.4.4. 0.01 OH Kepala tuka L.9 0.20 150,000 1,200 30,000 Biaya 20-Jun-20 20-Jun-20 30,000 FN2 ARS P 1 2
118 P06 [ 25 m1 / 1 hari 25 m1 U-055 [ m1 ] Pemasa 4 U-055.4 A.4.4. 0.00 OH Mandor ( O L.10 0.10 185,000 740 18,500 Biaya 20-Jun-20 20-Jun-20 18,500 FN2 ARS P 1 1
118 P06 [ 25 m1 / 1 hari 25 m1 U-055 [ m1 ] Pemasa 5 U-055.5 A.4.4. 5.00 bh Ballnose RoM.74 125.00 2,500 12,500 312,500 Biaya 20-Jun-20 20-Jun-20 312,500 FN2 ARS P - -
118 P06 [ 25 m1 / 1 hari 25 m1 U-055 [ m1 ] Pemasa 6 U-055.6 A.4.4. 1.10 kg Semen ( kg M.12 27.50 1,300 1,430 35,750
Biaya Bahan 20-Jun-20 20-Jun-20 35,750 FN2 ARS P - -
118 P06 [ 25 m1 / 1 hari 25 m1 U-055 [ m1 ] Pemasa 7 U-055.7 A.4.4. 0.10 Kg Semen WarnM.13 2.50 15,000 1,500 37,500
Biaya Bahan 20-Jun-20 20-Jun-20 37,500 FN2 ARS P - -
118 P06 [ 25 m1 / 1 hari 25 m1 U-055 [ m1 ] Pemasa 8 U-055.8 A.4.4. 0.00 M3 Pasir Pasan M.9 0.08 255,000 765 19,125
Biaya Bahan 20-Jun-20 20-Jun-20 19,125 FN2 ARS P - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 119 P07 [ 14 m2 / 1 hari 13.929 m2 U-114 [ m2 ] Pekerja 1 U-114.1 AK-I. 0.10 kg Plamir ( kg M.11 1.39 12,000 1,200 16,715 Biaya 20-Jun-20 20-Jun-20 16,715 FN2 ARS P - 1.0 -
119 P07 [ 14 m2 / 1 hari 13.929 m2 U-114 [ m2 ] Pekerja 2 U-114.2 AK-I. 0.50 Lbr Amplas ( LbM.134 6.96 3,500 1,750 24,376 Biaya 20-Jun-20 20-Jun-20 24,376 FN2 ARS P - -
119 P07 [ 14 m2 / 1 hari 13.929 m2 U-114 [ m2 ] Pekerja 3 U-114.3 AK-I. 0.02 oh Pekerja ( oh L.1 0.28 85,000 1,700 23,680 Biaya 15,000 20-Jun-20 20-Jun-20 23,680 FN2 ARS P 3 5
119 P07 [ 14 m2 / 1 hari 13.929 m2 U-114 [ m2 ] Pekerja 4 U-114.4 AK-I. 0.07 oh Tukang Cat L.5 0.98 100,000 7,000 97,505 Biaya 20-Jun-20 20-Jun-20 97,505 FN2 ARS P 1 2
119 P07 [ 14 m2 / 1 hari 13.929 m2 U-114 [ m2 ] Pekerja 5 U-114.5 AK-I. 0.01 oh Kepala Tuka L.9 0.14 150,000 1,500 20,894 Biaya 20-Jun-20 20-Jun-20 20,894 FN2 ARS P 1 2
119 P07 [ 14 m2 / 1 hari 13.929 m2 U-114 [ m2 ] Pekerja 6 U-114.6 AK-I. 0.01 oh Mandor ( oh L.10 0.14 185,000 1,850 25,769
Biaya Upah 20-Jun-20 20-Jun-20 25,769 FN2 ARS P 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
7 120 P08 [ 14 m2 / 1 hari 13.929 m2 U-116 [ m2 ] Pengecat 1 U-116.1 A.4.7. 0.02 OH Pekerja ( O L.1 0.28 85,000 1,700 23,680 Biaya 18,519 20-Jun-20 20-Jun-20 23,680 FN2 ARS P 3 1.0 5
120 P08 [ 14 m2 / 1 hari 13.929 m2 U-116 [ m2 ] Pengecat 2 U-116.2 A.4.7. 0.06 OH Tukang cat L.5 0.88 100,000 6,300 87,755 Biaya 20-Jun-20 20-Jun-20 87,755 FN2 ARS P 1 2
120 P08 [ 14 m2 / 1 hari 13.929 m2 U-116 [ m2 ] Pengecat 3 U-116.3 A.4.7. 0.01 OH Kepala tuka L.9 0.09 150,000 945 13,163 Biaya 20-Jun-20 20-Jun-20 13,163 FN2 ARS P 1 2
120 P08 [ 14 m2 / 1 hari 13.929 m2 U-116 [ m2 ] Pengecat 4 U-116.4 A.4.7. 0.00 OH Mandor ( O L.10 0.04 185,000 555 7,731 Biaya 20-Jun-20 20-Jun-20 7,731 FN2 ARS P 1 1
120 P08 [ 14 m2 / 1 hari 13.929 m2 U-116 [ m2 ] Pengecat 5 U-116.5 A.4.7. 0.10 Kg Plamir ( Kg M.11 1.39 12,000 1,200 16,715 Biaya 20-Jun-20 20-Jun-20 16,715 FN2 ARS P - -
120 P08 [ 14 m2 / 1 hari 13.929 m2 U-116 [ m2 ] Pengecat 6 U-116.6 A.4.7. 0.10 Kg Cat Dasar T M.64 1.39 26,190 2,619 36,482
Biaya Bahan 20-Jun-20 20-Jun-20 36,482 FN2 ARS P - -
120 P08 [ 14 m2 / 1 hari 13.929 m2 U-116 [ m2 ] Pengecat 7 U-116.7 A.4.7. 0.26 Kg Cat Tembok M.66 3.62 20,000 5,200 72,433
Biaya Bahan 20-Jun-20 20-Jun-20 72,433 FN2 ARS P - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

### 121 P09 [ 9 m1 / 1 hari ] 9 m1 U-144 [ m1 ] Pek.Pem 1 U-144.1 0 2.64 m1 Hollow SS M.30 23.76 83,333 220,000 1,980,000 Biaya 20-Jun-20 20-Jun-20 1,980,000 FN2 ARS P - 1.0 -
121 P09 [ 9 m1 / 1 hari ] 9 m1 U-144 [ m1 ] Pek.Pem 2 U-144.2 0 4.00 m1 Hollow SS M.29 36.00 58,333 233,333 2,100,000 Biaya 20-Jun-20 20-Jun-20 2,100,000 FN2 ARS P - -
121 P09 [ 9 m1 / 1 hari ] 9 m1 U-144 [ m1 ] Pek.Pem 3 U-144.3 0 1.10 m1 Pipa SS Dia M.32 9.90 82,500 90,750 816,750 Biaya 20-Jun-20 20-Jun-20 816,750 FN2 ARS P - -
121 P09 [ 9 m1 / 1 hari ] 9 m1 U-144 [ m1 ] Pek.Pem 4 U-144.4 0 0.20 kg Kawat las liM.137 1.80 135,000 27,000 243,000 Biaya 20-Jun-20 20-Jun-20 243,000 FN2 ARS P - -
121 P09 [ 9 m1 / 1 hari ] 9 m1 U-144 [ m1 ] Pek.Pem 5 U-144.5 0 0.10 jam Sewa alat la A.6 0.90 150,000 15,000 135,000 Biaya A 20-Jun-20 20-Jun-20 135,000 FN2 ARS P - -
121 P09 [ 9 m1 / 1 hari ] 9 m1 U-144 [ m1 ] Pek.Pem 6 U-144.6 0 0.20 oh Pekerja ( oh L.1 1.80 85,000 17,000 153,000
Biaya Upah 643,933 20-Jun-20 20-Jun-20 153,000 FN2 ARS P 3 5
121 P09 [ 9 m1 / 1 hari ] 9 m1 U-144 [ m1 ] Pek.Pem 7 U-144.7 0 0.35 oh Tukang Besi L.4 3.15 100,000 35,000 315,000
Biaya Upah 20-Jun-20 20-Jun-20 315,000 FN2 ARS P 1 2
121 P09 [ 9 m1 / 1 hari ] 9 m1 U-144 [ m1 ] Pek.Pem 8 U-144.8 0 0.01 oh Kepala Tuka L.9 0.09 150,000 1,500 13,500
Biaya Upah 20-Jun-20 20-Jun-20 13,500 FN2 ARS P 1 2
121 P09 [ 9 m1 / 1 hari ] 9 m1 U-144 [ m1 ] Pek.Pem 9 U-144.9 0 0.01 oh Mandor ( oh L.10 0.09 185,000 1,850 16,650
Biaya Upah 20-Jun-20 20-Jun-20 16,650 FN2 ARS P 1 1
121 P09 [ 9 m1 / 1 hari ] 9 m1 U-144 [ m1 ] Pek.Pem 10 U-144.10 0 0.01 Ls Perlengkap A.4 0.09 250,000 2,500 22,500Biaya Alat 20-Jun-20 20-Jun-20 22,500 FN2 ARS P - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

2 122 Q01 [ 1,5 m3 / 1 hari 1.44 m3 U-006 [ m3 ] Penggal 1 U-006.1 A.2.3. 0.75 OH Pekerja ( O L.1 1.08 85,000 63,750 91,800 Biaya 68,375 15-May-20 15-May-20 91,800 FN2 ARS Q 3 1.0 5
122 Q01 [ 1,5 m3 / 1 hari 1.44 m3 U-006 [ m3 ] Penggal 2 U-006.2 A.2.3. 0.03 OH Mandor ( O L.10 0.04 185,000 4,625 6,660 Biaya 15-May-20 15-May-20 6,660 FN2 ARS Q 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

7 123 Q02 [ 1,1 m3 / 1 hari 1.05 m3 U-013 [ m3 ] Pemasa 1 U-013.1 A.3.2. 1.50 OH Pekerja ( O L.1 1.58 85,000 127,500 133,875 Biaya 843,145 14-May-20 14-May-20 133,875 FN2 ARS Q 3 1.0 5
123 Q02 [ 1,1 m3 / 1 hari 1.05 m3 U-013 [ m3 ] Pemasa 2 U-013.2 A.3.2. 0.75 OH Tukang Bat L.3 0.79 100,000 75,000 78,750 Biaya 14-May-20 14-May-20 78,750 FN2 ARS Q 1 2
123 Q02 [ 1,1 m3 / 1 hari 1.05 m3 U-013 [ m3 ] Pemasa 3 U-013.3 A.3.2. 0.08 OH Kepala Tuk L.9 0.08 150,000 11,250 11,813 Biaya 14-May-20 14-May-20 11,813 FN2 ARS Q 1 2
123 Q02 [ 1,1 m3 / 1 hari 1.05 m3 U-013 [ m3 ] Pemasa 4 U-013.4 A.3.2. 0.08 OH Mandor ( O L.10 0.08 185,000 13,875 14,569 Biaya 14-May-20 14-May-20 14,569 FN2 ARS Q 1 1
123 Q02 [ 1,1 m3 / 1 hari 1.05 m3 U-013 [ m3 ] Pemasa 5 U-013.5 A.3.2. 1.20 m3 Batu belah M.5 1.26 250,000 300,000 315,000 Biaya 14-May-20 14-May-20 315,000 FN2 ARS Q - -
123 Q02 [ 1,1 m3 / 1 hari 1.05 m3 U-013 [ m3 ] Pemasa 6 U-013.6 A.3.2. 136.00 Kg Semen ( Kg M.12 142.80 1,300 176,800 185,640
Biaya Bahan 14-May-20 14-May-20 185,640 FN2 ARS Q - -
123 Q02 [ 1,1 m3 / 1 hari 1.05 m3 U-013 [ m3 ] Pemasa 7 U-013.7 A.3.2. 0.54 m3 Pasir Pasan M.9 0.57 255,000 138,720 145,656
Biaya Bahan 14-May-20 14-May-20 145,656 FN2 ARS Q - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 124 Q03 [ 21 kg / 1 hari 20.958 kg U-033 [ kg ] Pembesia 1 U-033.1 A.4.1. 0.01 OH Pekerja ( O L.1 0.15 85,000 595 12,470 Biaya 12,327 13-May-20 13-May-20 12,470 FN2 ARS Q 3 1.0 5
124 Q03 [ 21 kg / 1 hari 20.958 kg U-033 [ kg ] Pembesia 2 U-033.2 A.4.1. 0.01 OH Tukang Bes L.4 0.15 100,000 700 14,670 Biaya 13-May-20 13-May-20 14,670 FN2 ARS Q 1 2
124 Q03 [ 21 kg / 1 hari 20.958 kg U-033 [ kg ] Pembesia 3 U-033.3 A.4.1. 0.00 OH Kepala Tuk L.9 0.01 150,000 105 2,201 Biaya 13-May-20 13-May-20 2,201 FN2 ARS Q 1 2
124 Q03 [ 21 kg / 1 hari 20.958 kg U-033 [ kg ] Pembesia 4 U-033.4 A.4.1. 0.00 OH Mandor ( O L.10 0.01 185,000 74 1,551 Biaya 13-May-20 13-May-20 1,551 FN2 ARS Q 1 1
124 Q03 [ 21 kg / 1 hari 20.958 kg U-033 [ kg ] Pembesia 5 U-033.5 A.4.1. 1.05 kg Besi beton ( M.16 22.01 10,000 10,500 220,055 Biaya 13-May-20 13-May-20 220,055 FN2 ARS Q - -
124 Q03 [ 21 kg / 1 hari 20.958 kg U-033 [ kg ] Pembesia 6 U-033.6 A.4.1. 0.02 kg Kawat betonM.27 0.31 23,500 353 7,388
Biaya Bahan 13-May-20 13-May-20 7,388 FN2 ARS Q - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

7 125 Q04 [ 0,9 m2 / 1 hari 0.9 m2 U-035 [ m2 ] (K3) Pe 1 U-035.1 A.4.1. 0.52 OH Pekerja ( O L.1 0.47 85,000 44,200 39,780 Biaya 194,485 12-May-20 12-May-20 39,780 FN2 ARS Q 3 1.0 5
125 Q04 [ 0,9 m2 / 1 hari 0.9 m2 U-035 [ m2 ] (K3) Pe 2 U-035.2 A.4.1. 0.26 OH Tukang Kay L.6 0.23 100,000 26,000 23,400 Biaya 12-May-20 12-May-20 23,400 FN2 ARS Q 1 2
125 Q04 [ 0,9 m2 / 1 hari 0.9 m2 U-035 [ m2 ] (K3) Pe 3 U-035.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.02 150,000 3,900 3,510 Biaya 12-May-20 12-May-20 3,510 FN2 ARS Q 1 2
125 Q04 [ 0,9 m2 / 1 hari 0.9 m2 U-035 [ m2 ] (K3) Pe 4 U-035.4 A.4.1. 0.03 OH Mandor ( O L.10 0.02 185,000 4,810 4,329 Biaya 12-May-20 12-May-20 4,329 FN2 ARS Q 1 1
125 Q04 [ 0,9 m2 / 1 hari 0.9 m2 U-035 [ m2 ] (K3) Pe 5 U-035.5 A.4.1. 0.05 m3 Papan KayuM.107 0.04 2,300,000 103,500 93,150 Biaya 12-May-20 12-May-20 93,150 FN2 ARS Q - -
125 Q04 [ 0,9 m2 / 1 hari 0.9 m2 U-035 [ m2 ] (K3) Pe 6 U-035.6 A.4.1. 0.30 kg Paku Biasa 2M.111 0.27 25,000 7,500 6,750
Biaya Bahan 12-May-20 12-May-20 6,750 FN2 ARS Q - -
125 Q04 [ 0,9 m2 / 1 hari 0.9 m2 U-035 [ m2 ] (K3) Pe 7 U-035.7 A.4.1. 0.10 Ltr Minyak bekiM.141 0.09 45,750 4,575 4,118
Biaya Bahan 12-May-20 12-May-20 4,118 FN2 ARS Q - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

8 126 Q05 [ 0,2 m3 / 1 hari 0.135 m3 U-026 [ m3 ] Membua 1 U-026.1 A.4.1. 1.65 OH Pekerja ( O L.1 0.22 85,000 140,250 18,934 Biaya 954,206 11-May-20 11-May-20 18,934 FN2 ARS Q 3 1.0 5
126 Q05 [ 0,2 m3 / 1 hari 0.135 m3 U-026 [ m3 ] Membua 2 U-026.2 A.4.1. 0.28 OH Tukang Bat L.3 0.04 100,000 27,500 3,713 Biaya 11-May-20 11-May-20 3,713 FN2 ARS Q 1 2
126 Q05 [ 0,2 m3 / 1 hari 0.135 m3 U-026 [ m3 ] Membua 3 U-026.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.00 150,000 4,200 567 Biaya 11-May-20 11-May-20 567 FN2 ARS Q 1 2
126 Q05 [ 0,2 m3 / 1 hari 0.135 m3 U-026 [ m3 ] Membua 4 U-026.4 A.4.1. 0.08 OH Mandor ( O L.10 0.01 185,000 15,355 2,073 Biaya 11-May-20 11-May-20 2,073 FN2 ARS Q 1 1
126 Q05 [ 0,2 m3 / 1 hari 0.135 m3 U-026 [ m3 ] Membua 5 U-026.5 A.4.1. 352.00 kg Semen ( kg M.12 47.52 1,300 457,600 61,776 Biaya 11-May-20 11-May-20 61,776 FN2 ARS Q - -
126 Q05 [ 0,2 m3 / 1 hari 0.135 m3 U-026 [ m3 ] Membua 6 U-026.6 A.4.1. 0.52 m3 Pasir Beton M.8 0.07 250,000 130,536 17,622
Biaya Bahan 11-May-20 11-May-20 17,622 FN2 ARS Q - -
126 Q05 [ 0,2 m3 / 1 hari 0.135 m3 U-026 [ m3 ] Membua 7 U-026.7 A.4.1. 0.76 m3 Kerikil ( m3 M.7 0.10 220,000 168,015 22,682
Biaya Bahan 11-May-20 11-May-20 22,682 FN2 ARS Q - -
126 Q05 [ 0,2 m3 / 1 hari 0.135 m3 U-026 [ m3 ] Membua 8 U-026.8 A.4.1. 215.00 Ltr Air ( Ltr ) M.1 29.03 50 10,750 1,451
Biaya Bahan 11-May-20 11-May-20 1,451 FN2 ARS Q - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 127 Q06 [ 19,3 kg / 1 ha 19.235 kg U-033 [ kg ] Pembesia 1 U-033.1 A.4.1. 0.01 OH Pekerja ( O L.1 0.13 85,000 595 11,445 Biaya 12,327 10-May-20 10-May-20 11,445 FN2 ARS Q 3 1.0 5
127 Q06 [ 19,3 kg / 1 ha 19.235 kg U-033 [ kg ] Pembesia 2 U-033.2 A.4.1. 0.01 OH Tukang Bes L.4 0.13 100,000 700 13,465 Biaya 10-May-20 10-May-20 13,465 FN2 ARS Q 1 2
127 Q06 [ 19,3 kg / 1 ha 19.235 kg U-033 [ kg ] Pembesia 3 U-033.3 A.4.1. 0.00 OH Kepala Tuk L.9 0.01 150,000 105 2,020 Biaya 10-May-20 10-May-20 2,020 FN2 ARS Q 1 2
127 Q06 [ 19,3 kg / 1 ha 19.235 kg U-033 [ kg ] Pembesia 4 U-033.4 A.4.1. 0.00 OH Mandor ( O L.10 0.01 185,000 74 1,423 Biaya 10-May-20 10-May-20 1,423 FN2 ARS Q 1 1
127 Q06 [ 19,3 kg / 1 ha 19.235 kg U-033 [ kg ] Pembesia 5 U-033.5 A.4.1. 1.05 kg Besi beton ( M.16 20.20 10,000 10,500 201,972 Biaya 10-May-20 10-May-20 201,972 FN2 ARS Q - -
127 Q06 [ 19,3 kg / 1 ha 19.235 kg U-033 [ kg ] Pembesia 6 U-033.6 A.4.1. 0.02 kg Kawat betonM.27 0.29 23,500 353 6,780
Biaya Bahan 10-May-20 10-May-20 6,780 FN2 ARS Q - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

### 128 Q07 [ 1,4 m2 / 1 hari 1.3029 m2 U-036 [ m2 ] (K3) P 1 U-036.1 A.4.1. 0.66 OH Pekerja ( O L.1 0.86 85,000 56,100 73,090 Biaya 369,055 9-May-20 09-May-20 73,090 FN2 ARS Q 3 1.0 5
128 Q07 [ 1,4 m2 / 1 hari 1.3029 m2 U-036 [ m2 ] (K3) P 2 U-036.2 A.4.1. 0.33 OH Tukang Kay L.6 0.43 100,000 33,000 42,994 Biaya 9-May-20 09-May-20 42,994 FN2 ARS Q 1 2
128 Q07 [ 1,4 m2 / 1 hari 1.3029 m2 U-036 [ m2 ] (K3) P 3 U-036.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.04 150,000 4,950 6,449 Biaya 9-May-20 09-May-20 6,449 FN2 ARS Q 1 2
128 Q07 [ 1,4 m2 / 1 hari 1.3029 m2 U-036 [ m2 ] (K3) P 4 U-036.4 A.4.1. 0.03 OH Mandor ( O L.10 0.04 185,000 6,105 7,954 Biaya 9-May-20 09-May-20 7,954 FN2 ARS Q 1 1
128 Q07 [ 1,4 m2 / 1 hari 1.3029 m2 U-036 [ m2 ] (K3) P 5 U-036.5 A.4.1. 0.04 m3 Papan KayuM.107 0.05 2,300,000 92,000 119,863 Biaya 9-May-20 09-May-20 119,863 FN2 ARS Q - -
128 Q07 [ 1,4 m2 / 1 hari 1.3029 m2 U-036 [ m2 ] (K3) P 6 U-036.6 A.4.1. 0.40 kg Paku Biasa 2M.111 0.52 25,000 10,000 13,029
Biaya Bahan 9-May-20 09-May-20 13,029 FN2 ARS Q - -
128 Q07 [ 1,4 m2 / 1 hari 1.3029 m2 U-036 [ m2 ] (K3) P 7 U-036.7 A.4.1. 0.20 Ltr Minyak bekiM.141 0.26 45,750 9,150 11,921
Biaya Bahan 9-May-20 09-May-20 11,921 FN2 ARS Q - -
128 Q07 [ 1,4 m2 / 1 hari 1.3029 m2 U-036 [ m2 ] (K3) P 8 U-036.8 A.4.1. 0.02 m3 Balok Kayu M.98 0.02 3,100,000 46,500 60,583
Biaya Bahan 9-May-20 09-May-20 60,583 FN2 ARS Q - -
128 Q07 [ 1,4 m2 / 1 hari 1.3029 m2 U-036 [ m2 ] (K3) P 9 U-036.9 A.4.1. 0.35 Lbr Plywood 120M.60 0.46 175,000 61,250 79,800
Biaya Bahan 9-May-20 09-May-20 79,800 FN2 ARS Q - -
128 Q07 [ 1,4 m2 / 1 hari 1.3029 m2 U-036 [ m2 ] (K3) P 10 U-036.10 A.4.1. 2.00 btg Dolken kayuM.104 2.61 25,000 50,000 65,143
Biaya Bahan 9-May-20 09-May-20 65,143 FN2 ARS Q - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

8 129 Q08 [ 0,2 m3 / 1 hari 0.1221 m3 U-026 [ m3 ] Membua 1 U-026.1 A.4.1. 1.65 OH Pekerja ( O L.1 0.20 85,000 140,250 17,131 Biaya 954,206 8-May-20 08-May-20 17,131 FN2 ARS Q 3 1.0 5
129 Q08 [ 0,2 m3 / 1 hari 0.1221 m3 U-026 [ m3 ] Membua 2 U-026.2 A.4.1. 0.28 OH Tukang Bat L.3 0.03 100,000 27,500 3,359 Biaya 8-May-20 08-May-20 3,359 FN2 ARS Q 1 2
129 Q08 [ 0,2 m3 / 1 hari 0.1221 m3 U-026 [ m3 ] Membua 3 U-026.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.00 150,000 4,200 513 Biaya 8-May-20 08-May-20 513 FN2 ARS Q 1 2
129 Q08 [ 0,2 m3 / 1 hari 0.1221 m3 U-026 [ m3 ] Membua 4 U-026.4 A.4.1. 0.08 OH Mandor ( O L.10 0.01 185,000 15,355 1,876 Biaya 8-May-20 08-May-20 1,876 FN2 ARS Q 1 1
129 Q08 [ 0,2 m3 / 1 hari 0.1221 m3 U-026 [ m3 ] Membua 5 U-026.5 A.4.1. 352.00 kg Semen ( kg M.12 42.99 1,300 457,600 55,893 Biaya 8-May-20 08-May-20 55,893 FN2 ARS Q - -
129 Q08 [ 0,2 m3 / 1 hari 0.1221 m3 U-026 [ m3 ] Membua 6 U-026.6 A.4.1. 0.52 m3 Pasir Beton M.8 0.06 250,000 130,536 15,944
Biaya Bahan 8-May-20 08-May-20 15,944 FN2 ARS Q - -
129 Q08 [ 0,2 m3 / 1 hari 0.1221 m3 U-026 [ m3 ] Membua 7 U-026.7 A.4.1. 0.76 m3 Kerikil ( m3 M.7 0.09 220,000 168,015 20,522
Biaya Bahan 8-May-20 08-May-20 20,522 FN2 ARS Q - -
129 Q08 [ 0,2 m3 / 1 hari 0.1221 m3 U-026 [ m3 ] Membua 8 U-026.8 A.4.1. 215.00 Ltr Air ( Ltr ) M.1 26.26 50 10,750 1,313
Biaya Bahan 8-May-20 08-May-20 1,313 FN2 ARS Q - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 130 Q09 [ 21 kg / 1 hari 20.958 kg U-033 [ kg ] Pembesia 1 U-033.1 A.4.1. 0.01 OH Pekerja ( O L.1 0.15 85,000 595 12,470 Biaya 12,327 7-May-20 07-May-20 12,470 FN2 ARS Q 3 1.0 5
130 Q09 [ 21 kg / 1 hari 20.958 kg U-033 [ kg ] Pembesia 2 U-033.2 A.4.1. 0.01 OH Tukang Bes L.4 0.15 100,000 700 14,670 Biaya 7-May-20 07-May-20 14,670 FN2 ARS Q 1 2
130 Q09 [ 21 kg / 1 hari 20.958 kg U-033 [ kg ] Pembesia 3 U-033.3 A.4.1. 0.00 OH Kepala Tuk L.9 0.01 150,000 105 2,201 Biaya 7-May-20 07-May-20 2,201 FN2 ARS Q 1 2
130 Q09 [ 21 kg / 1 hari 20.958 kg U-033 [ kg ] Pembesia 4 U-033.4 A.4.1. 0.00 OH Mandor ( O L.10 0.01 185,000 74 1,551 Biaya 7-May-20 07-May-20 1,551 FN2 ARS Q 1 1
130 Q09 [ 21 kg / 1 hari 20.958 kg U-033 [ kg ] Pembesia 5 U-033.5 A.4.1. 1.05 kg Besi beton ( M.16 22.01 10,000 10,500 220,055 Biaya 7-May-20 07-May-20 220,055 FN2 ARS Q - -
130 Q09 [ 21 kg / 1 hari 20.958 kg U-033 [ kg ] Pembesia 6 U-033.6 A.4.1. 0.02 kg Kawat betonM.27 0.31 23,500 353 7,388
Biaya Bahan 7-May-20 07-May-20 7,388 FN2 ARS Q - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

### 131 Q10 [ 1,4 m2 / 1 hari 1.35 m2 U-037 [ m2 ] (K3) Pe 1 U-037.1 A.4.1. 0.66 OH Pekerja ( O L.1 0.89 85,000 56,100 75,735 Biaya 378,355 6-May-20 06-May-20 75,735 FN2 ARS Q 3 1.0 5
131 Q10 [ 1,4 m2 / 1 hari 1.35 m2 U-037 [ m2 ] (K3) Pe 2 U-037.2 A.4.1. 0.33 OH Tukang Kay L.6 0.45 100,000 33,000 44,550 Biaya 6-May-20 06-May-20 44,550 FN2 ARS Q 1 2
131 Q10 [ 1,4 m2 / 1 hari 1.35 m2 U-037 [ m2 ] (K3) Pe 3 U-037.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.04 150,000 4,950 6,683 Biaya 6-May-20 06-May-20 6,683 FN2 ARS Q 1 2
131 Q10 [ 1,4 m2 / 1 hari 1.35 m2 U-037 [ m2 ] (K3) Pe 4 U-037.4 A.4.1. 0.03 OH Mandor ( O L.10 0.04 185,000 6,105 8,242 Biaya 6-May-20 06-May-20 8,242 FN2 ARS Q 1 1
131 Q10 [ 1,4 m2 / 1 hari 1.35 m2 U-037 [ m2 ] (K3) Pe 5 U-037.5 A.4.1. 0.04 m3 Papan KayuM.107 0.05 2,300,000 92,000 124,200 Biaya 6-May-20 06-May-20 124,200 FN2 ARS Q - -
131 Q10 [ 1,4 m2 / 1 hari 1.35 m2 U-037 [ m2 ] (K3) Pe 6 U-037.6 A.4.1. 0.40 kg Paku Biasa 2M.111 0.54 25,000 10,000 13,500
Biaya Bahan 6-May-20 06-May-20 13,500 FN2 ARS Q - -
131 Q10 [ 1,4 m2 / 1 hari 1.35 m2 U-037 [ m2 ] (K3) Pe 7 U-037.7 A.4.1. 0.20 Ltr Minyak bekiM.141 0.27 45,750 9,150 12,353
Biaya Bahan 6-May-20 06-May-20 12,353 FN2 ARS Q - -
131 Q10 [ 1,4 m2 / 1 hari 1.35 m2 U-037 [ m2 ] (K3) Pe 8 U-037.8 A.4.1. 0.02 m3 Balok Kayu M.98 0.02 3,100,000 55,800 75,330
Biaya Bahan 6-May-20 06-May-20 75,330 FN2 ARS Q - -
131 Q10 [ 1,4 m2 / 1 hari 1.35 m2 U-037 [ m2 ] (K3) Pe 9 U-037.9 A.4.1. 0.35 Lbr Plywood 120M.60 0.47 175,000 61,250 82,688
Biaya Bahan 6-May-20 06-May-20 82,688 FN2 ARS Q - -
131 Q10 [ 1,4 m2 / 1 hari 1.35 m2 U-037 [ m2 ] (K3) Pe 10 U-037.10 A.4.1. 2.00 btg Dolken kayuM.104 2.70 25,000 50,000 67,500
Biaya Bahan 6-May-20 06-May-20 67,500 FN2 ARS Q - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

8 132 Q11 [ 0,2 m3 / 1 hari 0.135 m3 U-026 [ m3 ] Membua 1 U-026.1 A.4.1. 1.65 OH Pekerja ( O L.1 0.22 85,000 140,250 18,934 Biaya 954,206 5-May-20 05-May-20 18,934 FN2 ARS Q 3 1.0 5
132 Q11 [ 0,2 m3 / 1 hari 0.135 m3 U-026 [ m3 ] Membua 2 U-026.2 A.4.1. 0.28 OH Tukang Bat L.3 0.04 100,000 27,500 3,713 Biaya 5-May-20 05-May-20 3,713 FN2 ARS Q 1 2
132 Q11 [ 0,2 m3 / 1 hari 0.135 m3 U-026 [ m3 ] Membua 3 U-026.3 A.4.1. 0.03 OH Kepala Tuk L.9 0.00 150,000 4,200 567 Biaya 5-May-20 05-May-20 567 FN2 ARS Q 1 2
132 Q11 [ 0,2 m3 / 1 hari 0.135 m3 U-026 [ m3 ] Membua 4 U-026.4 A.4.1. 0.08 OH Mandor ( O L.10 0.01 185,000 15,355 2,073 Biaya 5-May-20 05-May-20 2,073 FN2 ARS Q 1 1
132 Q11 [ 0,2 m3 / 1 hari 0.135 m3 U-026 [ m3 ] Membua 5 U-026.5 A.4.1. 352.00 kg Semen ( kg M.12 47.52 1,300 457,600 61,776 Biaya 5-May-20 05-May-20 61,776 FN2 ARS Q - -
132 Q11 [ 0,2 m3 / 1 hari 0.135 m3 U-026 [ m3 ] Membua 6 U-026.6 A.4.1. 0.52 m3 Pasir Beton M.8 0.07 250,000 130,536 17,622
Biaya Bahan 5-May-20 05-May-20 17,622 FN2 ARS Q - -
132 Q11 [ 0,2 m3 / 1 hari 0.135 m3 U-026 [ m3 ] Membua 7 U-026.7 A.4.1. 0.76 m3 Kerikil ( m3 M.7 0.10 220,000 168,015 22,682
Biaya Bahan 5-May-20 05-May-20 22,682 FN2 ARS Q - -
132 Q11 [ 0,2 m3 / 1 hari 0.135 m3 U-026 [ m3 ] Membua 8 U-026.8 A.4.1. 215.00 Ltr Air ( Ltr ) M.1 29.03 50 10,750 1,451
Biaya Bahan 5-May-20 05-May-20 1,451 FN2 ARS Q - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

7 133 Q12 [ 16,9 m2 / 1 har 16.822 m2 U-016 [ m2 ] Pemasa 1 U-016.1 A.4.4. 0.30 OH Pekerja ( O L.1 5.05 85,000 25,500 428,956 Biaya 109,334 4-May-20 04-May-20 428,956 FN2 ARS Q 3 1.0 5
133 Q12 [ 16,9 m2 / 1 har 16.822 m2 U-016 [ m2 ] Pemasa 2 U-016.2 A.4.4. 0.10 OH Tukang Bat L.3 1.68 100,000 10,000 168,218 Biaya 4-May-20 04-May-20 168,218 FN2 ARS Q 1 2
133 Q12 [ 16,9 m2 / 1 har 16.822 m2 U-016 [ m2 ] Pemasa 3 U-016.3 A.4.4. 0.01 OH Kepala Tuk L.9 0.17 150,000 1,500 25,233 Biaya 4-May-20 04-May-20 25,233 FN2 ARS Q 1 2
133 Q12 [ 16,9 m2 / 1 har 16.822 m2 U-016 [ m2 ] Pemasa 4 U-016.4 A.4.4. 0.02 OH Mandor ( O L.10 0.25 185,000 2,775 46,680 Biaya 4-May-20 04-May-20 46,680 FN2 ARS Q 1 1
133 Q12 [ 16,9 m2 / 1 har 16.822 m2 U-016 [ m2 ] Pemasa 5 U-016.5 A.4.4. 70.00 bh Bata merah M.2 1177.53 650 45,500 765,391 Biaya 4-May-20 04-May-20 765,391 FN2 ARS Q - -
133 Q12 [ 16,9 m2 / 1 har 16.822 m2 U-016 [ m2 ] Pemasa 6 U-016.6 A.4.4. 9.68 Kg Semen ( Kg M.12 162.83 1,300 12,584 211,685
Biaya Bahan 4-May-20 04-May-20 211,685 FN2 ARS Q - -
133 Q12 [ 16,9 m2 / 1 har 16.822 m2 U-016 [ m2 ] Pemasa 7 U-016.7 A.4.4. 0.05 m3 Pasir Pasan M.9 0.76 255,000 11,475 193,030
Biaya Bahan 4-May-20 04-May-20 193,030 FN2 ARS Q - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 134 Q13 [ 24 m2 / 2 hari 24 m2 U-019 [ m2 ] Pemasan 1 U-019.1 A.4.4. 0.30 OH Pekerja ( O L.1 7.20 85,000 25,500 612,000 Biaya 58,894 4-May-20 05-May-20 306,000 FN2 ARS Q 3 2.0 5
134 Q13 [ 24 m2 / 2 hari 24 m2 U-019 [ m2 ] Pemasan 2 U-019.2 A.4.4. 0.15 OH Tukang Bat L.3 3.60 100,000 15,000 360,000 Biaya 4-May-20 05-May-20 180,000 FN2 ARS Q 1 2
134 Q13 [ 24 m2 / 2 hari 24 m2 U-019 [ m2 ] Pemasan 3 U-019.3 A.4.4. 0.02 OH Kepala Tuk L.9 0.36 150,000 2,250 54,000 Biaya 4-May-20 05-May-20 27,000 FN2 ARS Q 1 2
134 Q13 [ 24 m2 / 2 hari 24 m2 U-019 [ m2 ] Pemasan 4 U-019.4 A.4.4. 0.02 OH Mandor ( O L.10 0.36 185,000 2,775 66,600 Biaya 4-May-20 05-May-20 33,300 FN2 ARS Q 1 1
134 Q13 [ 24 m2 / 2 hari 24 m2 U-019 [ m2 ] Pemasan 5 U-019.5 A.4.4. 5.18 Kg Semen ( Kg M.12 124.42 1,300 6,739 161,741 Biaya 4-May-20 05-May-20 80,870 FN2 ARS Q - -
134 Q13 [ 24 m2 / 2 hari 24 m2 U-019 [ m2 ] Pemasan 6 U-019.6 A.4.4. 0.03 m3 Pasir Pasan M.9 0.62 255,000 6,630 159,120
Biaya Bahan 4-May-20 05-May-20 79,560 FN2 ARS Q - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

5 135 Q14 [ 2,5 m2 / 1 hari 2.5 m2 U-020 [ m2 ] Pemasan 1 U-020.1 A.4.4. 0.20 OH Pekerja ( O L.1 0.50 85,000 17,000 42,500 Biaya 34,575 5-May-20 05-May-20 42,500 FN2 ARS Q 3 1.0 5
135 Q14 [ 2,5 m2 / 1 hari 2.5 m2 U-020 [ m2 ] Pemasan 2 U-020.2 A.4.4. 0.10 OH Tukang Bat L.3 0.25 100,000 10,000 25,000 Biaya 5-May-20 05-May-20 25,000 FN2 ARS Q 1 2
135 Q14 [ 2,5 m2 / 1 hari 2.5 m2 U-020 [ m2 ] Pemasan 3 U-020.3 A.4.4. 0.01 OH Kepala Tuk L.9 0.03 150,000 1,500 3,750 Biaya 5-May-20 05-May-20 3,750 FN2 ARS Q 1 2
135 Q14 [ 2,5 m2 / 1 hari 2.5 m2 U-020 [ m2 ] Pemasan 4 U-020.4 A.4.4. 0.01 OH Mandor ( O L.10 0.03 185,000 1,850 4,625 Biaya 5-May-20 05-May-20 4,625 FN2 ARS Q 1 1
135 Q14 [ 2,5 m2 / 1 hari 2.5 m2 U-020 [ m2 ] Pemasan 5 U-020.5 A.4.4. 3.25 Kg Semen ( Kg M.12 8.13 1,300 4,225 10,563 Biaya 5-May-20 05-May-20 10,563 FN2 ARS Q - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

7 136 Q15 [ 2,5 m2 / 1 har 2.5 m2 U-143 [ m2 ] Pemasa 1 U-143.1 A.4.4. 0.70 OH Pekerja ( O L.1 1.75 85,000 59,500 148,750 Biaya 333,925 5-May-20 05-May-20 148,750 FN2 ARS Q 3 1.0 5
136 Q15 [ 2,5 m2 / 1 har 2.5 m2 U-143 [ m2 ] Pemasa 2 U-143.2 A.4.4. 0.35 OH Tukang Bat L.3 0.88 100,000 35,000 87,500 Biaya 5-May-20 05-May-20 87,500 FN2 ARS Q 1 2
136 Q15 [ 2,5 m2 / 1 har 2.5 m2 U-143 [ m2 ] Pemasa 3 U-143.3 A.4.4. 0.04 OH Kepala tuka L.9 0.09 150,000 5,250 13,125 Biaya 5-May-20 05-May-20 13,125 FN2 ARS Q 1 2
136 Q15 [ 2,5 m2 / 1 har 2.5 m2 U-143 [ m2 ] Pemasa 4 U-143.4 A.4.4. 0.04 OH Mandor ( O L.10 0.09 185,000 6,475 16,188 Biaya 5-May-20 05-May-20 16,188 FN2 ARS Q 1 1
136 Q15 [ 2,5 m2 / 1 har 2.5 m2 U-143 [ m2 ] Pemasa 5 U-143.5 A.4.4. 1.10 m2 Batu alam / M.4 2.75 185,000 203,500 508,750 Biaya 5-May-20 05-May-20 508,750 FN2 ARS Q - -
136 Q15 [ 2,5 m2 / 1 har 2.5 m2 U-143 [ m2 ] Pemasa 6 U-143.6 A.4.4. 11.75 Kg Semen ( Kg M.12 29.38 1,300 15,275 38,188
Biaya Bahan 5-May-20 05-May-20 38,188 FN2 ARS Q - -
136 Q15 [ 2,5 m2 / 1 har 2.5 m2 U-143 [ m2 ] Pemasa 7 U-143.7 A.4.4. 0.04 M3 Pasir Pasan M.9 0.09 255,000 8,925 22,313
Biaya Bahan 5-May-20 05-May-20 22,313 FN2 ARS Q - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

7 137 Q16 [ 24 m2 / 1 hari 24 m2 U-117 [ m2 ] Pengecat 1 U-117.1 A.4.7. 0.02 OH Pekerja ( O L.1 0.48 85,000 1,700 40,800 Biaya 20,869 5-May-20 05-May-20 40,800 FN2 ARS Q 3 1.0 5
137 Q16 [ 24 m2 / 1 hari 24 m2 U-117 [ m2 ] Pengecat 2 U-117.2 A.4.7. 0.06 OH Tukang cat L.5 1.51 100,000 6,300 151,200 Biaya 5-May-20 05-May-20 151,200 FN2 ARS Q 1 2
137 Q16 [ 24 m2 / 1 hari 24 m2 U-117 [ m2 ] Pengecat 3 U-117.3 A.4.7. 0.01 OH Kepala tuka L.9 0.15 150,000 945 22,680 Biaya 5-May-20 05-May-20 22,680 FN2 ARS Q 1 2
137 Q16 [ 24 m2 / 1 hari 24 m2 U-117 [ m2 ] Pengecat 4 U-117.4 A.4.7. 0.00 OH Mandor ( O L.10 0.07 185,000 555 13,320 Biaya 5-May-20 05-May-20 13,320 FN2 ARS Q 1 1
137 Q16 [ 24 m2 / 1 hari 24 m2 U-117 [ m2 ] Pengecat 5 U-117.5 A.4.7. 0.10 Kg Plamir ( Kg M.11 2.40 12,000 1,200 28,800 Biaya 5-May-20 05-May-20 28,800 FN2 ARS Q - -
137 Q16 [ 24 m2 / 1 hari 24 m2 U-117 [ m2 ] Pengecat 6 U-117.6 A.4.7. 0.10 Kg Cat Dasar T M.63 2.40 39,286 3,929 94,286
Biaya Bahan 5-May-20 05-May-20 94,286 FN2 ARS Q - -
137 Q16 [ 24 m2 / 1 hari 24 m2 U-117 [ m2 ] Pengecat 7 U-117.7 A.4.7. 0.26 Kg Cat Tembok M.65 6.24 24,000 6,240 149,760
Biaya Bahan 5-May-20 05-May-20 149,760 FN2 ARS Q - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

7 138 Q17 [ 10 m2 / 1 hari 10 m2 U-056 [ m2 ] Pemasan 1 U-056.1 A.4.4. 0.25 OH Pekerja ( O L.1 2.50 85,000 21,250 212,500 Biaya 220,313 5-May-20 05-May-20 212,500 FN2 OTH Q 3 1.0 5
138 Q17 [ 10 m2 / 1 hari 10 m2 U-056 [ m2 ] Pemasan 2 U-056.2 A.4.4. 0.25 OH Tukang Kay L.6 2.50 100,000 25,000 250,000 Biaya 5-May-20 05-May-20 250,000 FN2 OTH Q 1 2
138 Q17 [ 10 m2 / 1 hari 10 m2 U-056 [ m2 ] Pemasan 3 U-056.3 A.4.4. 0.03 OH Kepala tuka L.9 0.25 150,000 3,750 37,500 Biaya 5-May-20 05-May-20 37,500 FN2 OTH Q 1 2
138 Q17 [ 10 m2 / 1 hari 10 m2 U-056 [ m2 ] Pemasan 4 U-056.4 A.4.4. 0.00 OH Mandor ( O L.10 0.03 185,000 463 4,625 Biaya 5-May-20 05-May-20 4,625 FN2 OTH Q 1 1
138 Q17 [ 10 m2 / 1 hari 10 m2 U-056 [ m2 ] Pemasan 5 U-056.5 A.4.4. 1.01 M2 Paving blocM.118 10.10 135,000 136,350 1,363,500 Biaya 5-May-20 05-May-20 1,363,500 FN2 OTH Q - -
138 Q17 [ 10 m2 / 1 hari 10 m2 U-056 [ m2 ] Pemasan 6 U-056.6 A.4.4. 0.05 M3 Pasir beton M.8 0.50 250,000 12,500 125,000
Biaya Bahan 5-May-20 05-May-20 125,000 FN2 OTH Q - -
138 Q17 [ 10 m2 / 1 hari 10 m2 U-056 [ m2 ] Pemasan 7 U-056.7 A.4.4. 0.10 Ls Alat Bantu A.1 1.00 210,000 21,000 210,000Biaya Alat 5-May-20 05-May-20 210,000 FN2 OTH Q - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

6 139 Q18 [ 5 pohon / 1 ha 5 pohon U-142 [ pohon ] Pek 1 U-142.1 AK-I. 1.00 unit Pohon PerduM.142 5.00 500,000 500,000 2,500,000 Biaya 5-May-20 05-May-20 2,500,000 FN2 OTH Q - 1.0 -
139 Q18 [ 5 pohon / 1 ha 5 pohon U-142 [ pohon ] Pek 2 U-142.2 AK-I. 0.04 Ls Perlengkap A.4 0.20 250,000 10,000 50,000 Biaya A 5-May-20 05-May-20 50,000 FN2 OTH Q - -
139 Q18 [ 5 pohon / 1 ha 5 pohon U-142 [ pohon ] Pek 3 U-142.3 AK-I. 0.20 oh Pekerja ( oh L.1 1.00 85,000 17,000 85,000 Biaya 560,350 5-May-20 05-May-20 85,000 FN2 OTH Q 3 5
139 Q18 [ 5 pohon / 1 ha 5 pohon U-142 [ pohon ] Pek 4 U-142.4 AK-I. 0.30 oh Tukang Batu L.3 1.50 100,000 30,000 150,000 Biaya 5-May-20 05-May-20 150,000 FN2 OTH Q 1 2
139 Q18 [ 5 pohon / 1 ha 5 pohon U-142 [ pohon ] Pek 5 U-142.5 AK-I. 0.01 oh Kepala Tuka L.9 0.05 150,000 1,500 7,500 Biaya 5-May-20 05-May-20 7,500 FN2 OTH Q 1 2
139 Q18 [ 5 pohon / 1 ha 5 pohon U-142 [ pohon ] Pek 6 U-142.6 AK-I. 0.01 oh Mandor ( oh L.10 0.05 185,000 1,850 9,250
Biaya Upah 5-May-20 05-May-20 9,250 FN2 OTH Q 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

1 140 R01 [ 1 Ls / 1 hari 1 Ls U-112 [ Ls ] Penyamb 1 U-112.1 AK-I. 1.00 Ls Listrik PLNM.139 1.00 2,500,000 2,500,000 2,500,000 Biaya 28-Jul-20 28-Jul-20 2,500,000 FN2 ELE R - ### -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

1 141 R02 [ 1 Ls / 1 hari 1 Ls U-113 [ Ls ] Penyam 1 U-113.1 AK-I. 1.00 Ls Instalasi P M.135 1.00 2,300,000 2,300,000 2,300,000 Biaya 29-Jul-20 29-Jul-20 2,300,000 FN2 MEK R - ### -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

5 142 R03 [ 1 unit / 1 har 1 unit U-138 [ unit ] Peker 1 U-138.1 AK-I. 1.00 Unit Pompa Air (M.132 1.00 800,000 800,000 800,000 Biaya 30-Jul-20 30-Jul-20 800,000 FN2 ELE R - 1.0 -
142 R03 [ 1 unit / 1 har 1 unit U-138 [ unit ] Peker 2 U-138.2 AK-I. 0.40 Ls Perlengkap A.4 0.40 250,000 100,000 100,000 Biaya A 30-Jul-20 30-Jul-20 100,000 FN2 ELE R - -
142 R03 [ 1 unit / 1 har 1 unit U-138 [ unit ] Peker 3 U-138.3 AK-I. 0.40 Oh Pekerja ( O L.1 0.40 85,000 34,000 34,000 Biaya 957,700 30-Jul-20 30-Jul-20 34,000 FN2 ELE R 3 5
142 R03 [ 1 unit / 1 har 1 unit U-138 [ unit ] Peker 4 U-138.4 AK-I. 0.20 Oh Tukang Pipa L.8 0.20 100,000 20,000 20,000 Biaya 30-Jul-20 30-Jul-20 20,000 FN2 ELE R 1 2
142 R03 [ 1 unit / 1 har 1 unit U-138 [ unit ] Peker 5 U-138.5 AK-I. 0.02 Oh Mandor ( O L.10 0.02 185,000 3,700 3,700 Biaya 30-Jul-20 30-Jul-20 3,700 FN2 ELE R 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

5 143 R04 [ 2 unit / 1 hari 2 unit U-140 [ unit ] Peker 1 U-140.1 AK-I. 1.00 unit Exhaust FanM.128 2.00 300,000 300,000 600,000 Biaya 31-Jul-20 31-Jul-20 600,000 FN2 ELE R - 1.0 -
143 R04 [ 2 unit / 1 hari 2 unit U-140 [ unit ] Peker 2 U-140.2 AK-I. 0.03 Ls Perlengkap A.4 0.05 250,000 6,250 12,500 Biaya A 31-Jul-20 31-Jul-20 12,500 FN2 ELE R - -
143 R04 [ 2 unit / 1 hari 2 unit U-140 [ unit ] Peker 3 U-140.3 AK-I. 0.04 Oh Pekerja ( O L.1 0.08 85,000 3,570 7,140 Biaya 312,190 31-Jul-20 31-Jul-20 7,140 FN2 ELE R 3 5
143 R04 [ 2 unit / 1 hari 2 unit U-140 [ unit ] Peker 4 U-140.4 AK-I. 0.02 Oh Tukang List L.7 0.04 100,000 2,000 4,000 Biaya 31-Jul-20 31-Jul-20 4,000 FN2 ELE R 1 2
143 R04 [ 2 unit / 1 hari 2 unit U-140 [ unit ] Peker 5 U-140.5 AK-I. 0.00 Oh Mandor ( O L.10 0.00 185,000 370 740 Biaya 31-Jul-20 31-Jul-20 740 FN2 ELE R 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

5 144 R05 [ 1 unit / 1 hari 1 unit U-139 [ unit ] Peker 1 U-139.1 AK-I. 1.00 unit Air ConditioM.127 1.00 4,800,000 4,800,000 4,800,000 Biaya 1-Aug-20 01-Aug-20 4,800,000 FN2 ELE R - 1.0 -
144 R05 [ 1 unit / 1 hari 1 unit U-139 [ unit ] Peker 2 U-139.2 AK-I. 0.03 Ls Perlengkap A.4 0.03 250,000 6,250 6,250 Biaya A 1-Aug-20 01-Aug-20 6,250 FN2 ELE R - -
144 R05 [ 1 unit / 1 hari 1 unit U-139 [ unit ] Peker 3 U-139.3 AK-I. 0.04 Oh Pekerja ( O L.1 0.04 85,000 3,570 3,570 Biaya 4,812,190 1-Aug-20 01-Aug-20 3,570 FN2 ELE R 3 5
144 R05 [ 1 unit / 1 hari 1 unit U-139 [ unit ] Peker 4 U-139.4 AK-I. 0.02 Oh Tukang List L.7 0.02 100,000 2,000 2,000 Biaya 1-Aug-20 01-Aug-20 2,000 FN2 ELE R 1 2
144 R05 [ 1 unit / 1 hari 1 unit U-139 [ unit ] Peker 5 U-139.5 AK-I. 0.00 Oh Mandor ( O L.10 0.00 185,000 370 370 Biaya 1-Aug-20 01-Aug-20 370 FN2 ELE R 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

3 145 R06 [ 150 m2 / 6 har 150 m2 U-141 [ m2 ] Pember 1 U-141.1 A.2.2. 0.25 OH Pekerja ( O L.1 37.50 85,000 21,250 3,187,500 Biaya 26,100 2-Aug-20 07-Aug-20 531,250 DLL OTH R 3 6.0 5
145 R06 [ 150 m2 / 6 har 150 m2 U-141 [ m2 ] Pember 2 U-141.2 A.2.2. 0.02 OH Kepala Tuk L.9 3.00 150,000 3,000 450,000 Biaya 2-Aug-20 07-Aug-20 75,000 DLL OTH R 1 2
145 R06 [ 150 m2 / 6 har 150 m2 U-141 [ m2 ] Pember 3 U-141.3 A.2.2. 0.01 OH Mandor ( O L.10 1.50 185,000 1,850 277,500 Biaya 2-Aug-20 07-Aug-20 46,250 DLL OTH R 1 1
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 146 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 147 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 148 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
-1 149 . 1 ..1 - ### -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 150 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 151 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
-1 152 . 1 ..1 - ### -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 153 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 154 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 155 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 156 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 157 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 158 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 159 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 160 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 161 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 162 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 163 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 164 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 165 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 166 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 167 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 168 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 169 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 170 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 171 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 172 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 173 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 174 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 175 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 176 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 177 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 178 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 179 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 180 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
-1 181 . 1 ..1 - ### -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 182 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 183 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 184 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 185 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 186 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 187 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 188 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 189 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 190 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 191 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 192 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 193 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 194 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 195 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 196 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 197 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 198 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 199 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 200 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -

-1 201 . 1 ..1 - ### -


. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
. . . - -
1 Normal

LAPORAN RENCANA PELAKSANAAN OH vs Rate Harian


A002/T100.80/I-2020-Pembangunan Rumah Tinggal 2 Lantai Type 200 MATRIX BIAYA PROJECT (ALL)
Elemen - all - 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Kat.3 - all - - - 0.67 3.01 19.11 7.64 1.54 5.93 0.50 0.50 0.50 0.50 0.50 0.50
Kode Item - all - 0.67 0.67 0.67 3.01 19.11 7.64 1.54 5.93 0.50 0.50 0.50 0.50 0.50 0.50
0.67 0.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
ID Nama PekerNama Item Sum - Kebutuha Average - Harga DaSum - Total AverageAverage
A01
[ 150 m2 / 4 hari ] Pembersih 22.50 135,000 2,662,500 ### ###
Pekerja ( OH ) 15.00 85,000 1,275,000 ### ###
Mandor ( Oh ) 7.50 185,000 1,387,500 ### ###
A02
[ 52 m1 / 2 hari ] Pengukur 13.21 1,163,571 4,686,500 ### ###
Pekerja ( OH ) 5.20 85,000 442,000 ### ###
Tukang Kayu ( OH 5.20 100,000 520,000 ### ###
Kepala Tukang ( 0.52 150,000 78,000 ### ###
Paku Biasa 2" - 5" 1.04 25,000 26,000 ### ###
Balok Kayu 4x6-K.I 0.62 3,100,000 1,934,400 ### ###
Papan Kayu 2x20-K 0.36 4,500,000 1,638,000 ### ###
Mandor ( Oh ) 0.26 185,000 48,100 ### ###
A03
[ 1 Unit / 1 hari ] Pembuata 144.54 972,833 8,092,696 ### ###
Pekerja ( OH ) 5.00 85,000 425,000 ### ###
Tukang Kayu ( OH 2.00 100,000 200,000 ### ###
Kepala Tukang ( 1.00 150,000 150,000 ### ###
Paku Biasa 2" - 5" 7.29 25,000 182,325 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pasir Urug ( m3 ) 0.09 200,000 18,000 ### ###
Screw ( bh ) 69.99 500 34,993 ### ###
Tripleks ( Lbr ) 31.68 85,000 2,692,800 ### ###
Kerikil ( m3 ) 0.15 220,000 33,000 ### ###
Engsel Pintu ( bh 3.00 17,000 51,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Balok Kayu 5x10-K 0.32 3,500,000 1,108,800 ### ###
Balok Kayu 4x6-K.I 0.04 3,100,000 109,048 ### ###
Balok Kayu 3x4-K.I 0.10 2,800,000 266,112 ### ###
Balok Kayu 2x3-K.I 0.03 2,200,000 69,724 ### ###
Papan Kayu 2x20-K 0.20 4,500,000 891,000 ### ###
Perlengkapan Umu 1.00 250,000 250,000 ### ###
Mandor ( Oh ) 1.00 185,000 185,000 ### ###
Paku Biasa ½" - 1" 1.94 23,500 45,703 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Seng Gelombang 3" 19.72 70,000 1,380,192 ### ###
B01
[ 12,3 m3 / 2 hari ] Pekerjaan 11.62 135,000 1,043,348 ### ###
Pekerja ( OH ) 11.07 85,000 940,950 ### ###
Mandor ( Oh ) 0.55 185,000 102,398 ### ###
B02
[ 0,5 m3 / 1 hari ] Urugan Pasi 0.76 156,667 133,675 ### ###
Pekerja ( OH ) 0.15 85,000 12,750 ### ###
Pasir Urug ( m3 ) 0.60 200,000 120,000 ### ###
Mandor ( Oh ) 0.01 185,000 925 ### ###

295/396
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
B03
[ 442,1 kg / 1 hari ] Pekerja 477.45 92,250 5,448,871 ### ###
Pekerja ( OH ) 3.09 85,000 263,017 ### ###
Kepala Tukang ( 0.31 150,000 46,415 ### ###
Tukang Besi ( OH 3.09 100,000 309,432 ### ###
Besi beton ( kg ) 464.15 10,000 4,641,476 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kawat beton ( kg 6.63 23,500 155,821 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 0.18 185,000 32,711 ### ###
B04
[ 25,2 m2 / 3 hari ] Pekerjan 32.05 412,964 4,611,222 ### ###
Pekerja ( OH ) 13.10 85,000 1,113,840 ### ###
Tukang Kayu ( OH 6.55 100,000 655,200 ### ###
Kepala Tukang ( 0.66 150,000 98,280 ### ###
Paku Biasa 2" - 5" 7.56 25,000 189,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Minyak bekisting ( 2.52 45,750 115,290 ### ###
Papan Kayu 2x20-K 1.01 2,300,000 2,318,400 ### ###
Mandor ( Oh ) 0.66 185,000 121,212 ### ###
B05
[ 4 m3 / 1 hari ] Pekerjaan Co 2351.35 123,919 3,892,724 ### ###
Pekerja ( OH ) 6.58 85,000 559,598 ### ###
Kepala Tukang ( 0.11 150,000 16,758 ### ###
Tukang Batu ( OH 1.10 100,000 109,725 ### ###
Semen ( kg ) 1480.29 1,300 1,924,377 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Air ( Ltr ) 857.85 50 42,893 ### ###
Kerikil ( m3 ) 3.09 220,000 680,783 ### ###
Mandor ( Oh ) 0.33 185,000 61,266 ### ###
Pasir beton ( M3 1.99 250,000 497,325 ### ###
B06
[ 46,9 m3 / 8 hari ] Pekerjaan 44.31 135,000 3,977,383 ### ###
Pekerja ( OH ) 42.20 85,000 3,587,030 ### ###
Mandor ( Oh ) 2.11 185,000 390,353 ### ###
B07
[ 2,9 m3 / 1 hari ] Urugan Pa 4.37 156,667 773,818 ### ###
Pekerja ( OH ) 0.87 85,000 73,807 ### ###
Pasir Urug ( m3 ) 3.47 200,000 694,656 ### ###
Mandor ( Oh ) 0.03 185,000 5,355 ### ###
B08
[ 8,7 m3 / 2 hari ] Pek. Pem 25.01 161,667 4,382,975 ### ###
Pekerja ( OH ) 6.77 85,000 575,696 ### ###
Kepala Tukang ( 0.34 150,000 50,797 ### ###
Tukang Batu ( OH 3.39 100,000 338,645 ### ###
Pasir Urug ( m3 ) 3.75 200,000 750,228 ### ###
Batu belah ( m3 ) 10.42 250,000 2,604,960 ### ###
Mandor ( Oh ) 0.34 185,000 62,649 ### ###
B09
[ 30,4 m3 / 8 hari ] Pekerjaan 6263.17 146,614 27,774,518 ### ###
Pekerja ( OH ) 45.59 85,000 3,874,878 ### ###
Kepala Tukang ( 2.28 150,000 341,901 ### ###
Tukang Batu ( OH 22.79 100,000 2,279,340 ### ###
Semen ( kg ) 6139.02 1,300 7,980,729 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pasir Pasang ( m3 14.74 255,000 3,758,632 ### ###
Batu belah ( m3 ) 36.47 250,000 9,117,360 ### ###

296/396
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
Mandor ( Oh ) 2.28 185,000 421,678 ### ###
B10
[ 0,4 m3 / 1 hari ] Pekerjaan 0.32 135,000 28,841 ### ###
Pekerja ( OH ) 0.31 85,000 26,010 ### ###
Mandor ( Oh ) 0.02 185,000 2,831 ### ###
B11
[ 0,7 m1 / 1 hari ] Pek. Pasan 15.02 110,993 22,373 ### ###
Pekerja ( OH ) 0.06 85,000 5,202 ### ###
Kepala Tukang ( 0.00 150,000 306 ### ###
Tukang Batu ( OH 0.02 100,000 2,040 ### ###
Semen ( kg ) 3.36 1,300 4,369 ### ###
Pasir Pasang ( m3 0.01 255,000 2,376 ### ###
Bata merah ( bh ) 11.56 650 7,514 ### ###
Mandor ( Oh ) 0.00 185,000 566 ### ###
C01
[ 642,7 kg / 1 hari ] Pekerja 694.12 92,250 7,921,497 ### ###
Pekerja ( OH ) 4.50 85,000 382,371 ### ###
Kepala Tukang ( 0.45 150,000 67,477 ### ###
Tukang Besi ( OH 4.50 100,000 449,848 ### ###
Besi beton ( kg ) 674.77 10,000 6,747,716 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kawat beton ( kg 9.64 23,500 226,530 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 0.26 185,000 47,555 ### ###
C02
[ 38,4 m2 / 4 hari ] Pekerjaan 49.04 412,964 7,468,224 ### ###
Pekerja ( OH ) 19.97 85,000 1,697,280 ### ###
Tukang Kayu ( OH 9.98 100,000 998,400 ### ###
Kepala Tukang ( 1.00 150,000 149,760 ### ###
Paku Biasa 2" - 5" 11.52 25,000 288,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Minyak bekisting ( 3.84 45,750 175,680 ### ###
Papan Kayu 2x20-K 1.73 2,300,000 3,974,400 ### ###
Mandor ( Oh ) 1.00 185,000 184,704 ### ###
C03
[ 3,9 m3 / 1 hari ] Pekerjaan 2262.95 123,919 3,746,381 ### ###
Pekerja ( OH ) 6.34 85,000 538,560 ### ###
Kepala Tukang ( 0.11 150,000 16,128 ### ###
Tukang Batu ( OH 1.06 100,000 105,600 ### ###
Semen ( kg ) 1424.64 1,300 1,852,032 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Air ( Ltr ) 825.60 50 41,280 ### ###
Kerikil ( m3 ) 2.98 220,000 655,189 ### ###
Mandor ( Oh ) 0.32 185,000 58,963 ### ###
Pasir beton ( M3 1.91 250,000 478,629 ### ###
C04
[ 68,3 kg / 1 hari ] Pekerjaa 73.75 92,250 841,711 ### ###
Pekerja ( OH ) 0.48 85,000 40,629 ### ###
Kepala Tukang ( 0.05 150,000 7,170 ### ###
Tukang Besi ( OH 0.48 100,000 47,799 ### ###
Besi beton ( kg ) 71.70 10,000 716,989 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kawat beton ( kg 1.02 23,500 24,070 ### ###
Mandor ( Oh ) 0.03 185,000 5,053 ### ###
C05
[ 6,4 m2 / 1 hari ] Pekerjaan 8.17 412,964 1,244,704 ### ###
Pekerja ( OH ) 3.33 85,000 282,880 ### ###

297/396
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
Tukang Kayu ( OH 1.66 100,000 166,400 ### ###
Kepala Tukang ( 0.17 150,000 24,960 ### ###
Paku Biasa 2" - 5" 1.92 25,000 48,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Minyak bekisting ( 0.64 45,750 29,280 ### ###
Papan Kayu 2x20-K 0.29 2,300,000 662,400 ### ###
Mandor ( Oh ) 0.17 185,000 30,784 ### ###
C06
[ 0,5 m3 / 1 hari ] Pekerjaan 282.87 123,919 468,298 ### ###
Pekerja ( OH ) 0.79 85,000 67,320 ### ###
Kepala Tukang ( 0.01 150,000 2,016 ### ###
Tukang Batu ( OH 0.13 100,000 13,200 ### ###
Semen ( kg ) 178.08 1,300 231,504 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Air ( Ltr ) 103.20 50 5,160 ### ###
Kerikil ( m3 ) 0.37 220,000 81,899 ### ###
Mandor ( Oh ) 0.04 185,000 7,370 ### ###
Pasir beton ( M3 0.24 250,000 59,829 ### ###
D01
[ 38 m3 / 2 hari ] Urugan, Ti 57.38 143,333 8,335,300 ### ###
Pekerja ( OH ) 11.40 85,000 969,000 ### ###
Tanah urug ( m3 45.60 160,000 7,296,000 ### ###
Mandor ( Oh ) 0.38 185,000 70,300 ### ###
D02
[ 4,6 m3 / 1 hari ] Pemadata 2.51 135,000 235,980 ### ###
Pekerja ( OH ) 2.28 85,000 193,800 ### ###
Mandor ( Oh ) 0.23 185,000 42,180 ### ###
E01
[ 489,7 kg / 1 hari ] Pekerj 528.86 92,250 6,035,492 ### ###
Pekerja ( OH ) 3.43 85,000 291,333 ### ###
Kepala Tukang ( 0.34 150,000 51,412 ### ###
Tukang Besi ( OH 3.43 100,000 342,745 ### ###
Besi beton ( kg ) 514.12 10,000 5,141,173 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kawat beton ( kg 7.34 23,500 172,597 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 0.20 185,000 36,233 ### ###
E02
[ 50,4 m2 / 6 hari ] Pekerjaan 204.67 619,075 18,600,372 ### ###
Pekerja ( OH ) 33.26 85,000 2,827,440 ### ###
Tukang Kayu ( OH 16.63 100,000 1,663,200 ### ###
Kepala Tukang ( 1.66 150,000 249,480 ### ###
Paku Biasa 2" - 5" 20.16 25,000 504,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dolken kayu Ø 8- 100.80 25,000 2,520,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Minyak bekisting ( 10.08 45,750 461,160 ### ###
Plywood 120x240 17.64 175,000 3,087,000 ### ###
Balok Kayu 4x6-K.I 0.76 3,100,000 2,343,600 ### ###
Papan Kayu 2x20-K 2.02 2,300,000 4,636,800 ### ###
Mandor ( Oh ) 1.66 185,000 307,692 ### ###
E03
[ 4,4 m3 / 1 hari ] Pekerjaan 2545.82 123,919 4,214,679 ### ###
Pekerja ( OH ) 7.13 85,000 605,880 ### ###
Kepala Tukang ( 0.12 150,000 18,144 ### ###
Tukang Batu ( OH 1.19 100,000 118,800 ### ###
Semen ( kg ) 1602.72 1,300 2,083,536 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Air ( Ltr ) 928.80 50 46,440 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

298/396
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
Kerikil ( m3 ) 3.35 220,000 737,088 ### ###
Mandor ( Oh ) 0.36 185,000 66,334 ### ###
Pasir beton ( M3 2.15 250,000 538,457 ### ###
E04
[ 190,2 kg / 1 hari ] Pekerj 205.33 92,250 2,343,332 ### ###
Pekerja ( OH ) 1.33 85,000 113,113 ### ###
Kepala Tukang ( 0.13 150,000 19,961 ### ###
Tukang Besi ( OH 1.33 100,000 133,074 ### ###
Besi beton ( kg ) 199.61 10,000 1,996,105 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kawat beton ( kg 2.85 23,500 67,012 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 0.08 185,000 14,068 ### ###
E05
[ 27,6 m2 / 3 hari ] Pekerjaan 112.08 619,075 10,185,918 ### ###
Pekerja ( OH ) 18.22 85,000 1,548,360 ### ###
Tukang Kayu ( OH 9.11 100,000 910,800 ### ###
Kepala Tukang ( 0.91 150,000 136,620 ### ###
Paku Biasa 2" - 5" 11.04 25,000 276,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dolken kayu Ø 8- 55.20 25,000 1,380,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Minyak bekisting ( 5.52 45,750 252,540 ### ###
Plywood 120x240 9.66 175,000 1,690,500 ### ###
Balok Kayu 4x6-K.I 0.41 3,100,000 1,283,400 ### ###
Papan Kayu 2x20-K 1.10 2,300,000 2,539,200 ### ###
Mandor ( Oh ) 0.91 185,000 168,498 ### ###
E06
[ 1,1 m3 / 1 hari ] Pekerjaan 609.94 123,919 1,009,767 ### ###
Pekerja ( OH ) 1.71 85,000 145,159 ### ###
Kepala Tukang ( 0.03 150,000 4,347 ### ###
Tukang Batu ( OH 0.28 100,000 28,463 ### ###
Semen ( kg ) 383.99 1,300 499,181 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Air ( Ltr ) 222.53 50 11,126 ### ###
Kerikil ( m3 ) 0.80 220,000 176,594 ### ###
Mandor ( Oh ) 0.09 185,000 15,892 ### ###
Pasir beton ( M3 0.52 250,000 129,005 ### ###
E07
[ 494,8 kg / 1 hari ] Pekerj 534.35 92,250 6,098,144 ### ###
Pekerja ( OH ) 3.46 85,000 294,357 ### ###
Kepala Tukang ( 0.35 150,000 51,945 ### ###
Tukang Besi ( OH 3.46 100,000 346,303 ### ###
Besi beton ( kg ) 519.45 10,000 5,194,541 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kawat beton ( kg 7.42 23,500 174,388 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 0.20 185,000 36,609 ### ###
E08
[ 45,6 m2 / 5 hari ] Pekerjaan 185.18 619,075 16,828,908 ### ###
Pekerja ( OH ) 30.10 85,000 2,558,160 ### ###
Tukang Kayu ( OH 15.05 100,000 1,504,800 ### ###
Kepala Tukang ( 1.50 150,000 225,720 ### ###
Paku Biasa 2" - 5" 18.24 25,000 456,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dolken kayu Ø 8- 91.20 25,000 2,280,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Minyak bekisting ( 9.12 45,750 417,240 ### ###
Plywood 120x240 15.96 175,000 2,793,000 ### ###
Balok Kayu 4x6-K.I 0.68 3,100,000 2,120,400 ### ###
Papan Kayu 2x20-K 1.82 2,300,000 4,195,200 ### ###

299/396
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
Mandor ( Oh ) 1.50 185,000 278,388 ### ###
E09
[ 3,5 m3 / 1 hari ] Pekerjaan 2015.44 123,919 3,336,621 ### ###
Pekerja ( OH ) 5.64 85,000 479,655 ### ###
Kepala Tukang ( 0.10 150,000 14,364 ### ###
Tukang Batu ( OH 0.94 100,000 94,050 ### ###
Semen ( kg ) 1268.82 1,300 1,649,466 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Air ( Ltr ) 735.30 50 36,765 ### ###
Kerikil ( m3 ) 2.65 220,000 583,528 ### ###
Mandor ( Oh ) 0.28 185,000 52,514 ### ###
Pasir beton ( M3 1.71 250,000 426,279 ### ###
E10
[ 132,4 kg / 1 hari ] Pekerj 142.93 92,250 1,631,206 ### ###
Pekerja ( OH ) 0.93 85,000 78,738 ### ###
Kepala Tukang ( 0.09 150,000 13,895 ### ###
Tukang Besi ( OH 0.93 100,000 92,633 ### ###
Besi beton ( kg ) 138.95 10,000 1,389,499 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kawat beton ( kg 1.98 23,500 46,647 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 0.05 185,000 9,793 ### ###
E11
[ 19,2 m2 / 3 hari ] Pekerjaan 77.97 619,075 7,085,856 ### ###
Pekerja ( OH ) 12.67 85,000 1,077,120 ### ###
Tukang Kayu ( OH 6.34 100,000 633,600 ### ###
Kepala Tukang ( 0.63 150,000 95,040 ### ###
Paku Biasa 2" - 5" 7.68 25,000 192,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dolken kayu Ø 8- 38.40 25,000 960,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Minyak bekisting ( 3.84 45,750 175,680 ### ###
Plywood 120x240 6.72 175,000 1,176,000 ### ###
Balok Kayu 4x6-K.I 0.29 3,100,000 892,800 ### ###
Papan Kayu 2x20-K 0.77 2,300,000 1,766,400 ### ###
Mandor ( Oh ) 0.63 185,000 117,216 ### ###
E12
[ 0,8 m3 / 1 hari ] Pekerjaan 424.30 123,919 702,446 ### ###
Pekerja ( OH ) 1.19 85,000 100,980 ### ###
Kepala Tukang ( 0.02 150,000 3,024 ### ###
Tukang Batu ( OH 0.20 100,000 19,800 ### ###
Semen ( kg ) 267.12 1,300 347,256 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Air ( Ltr ) 154.80 50 7,740 ### ###
Kerikil ( m3 ) 0.56 220,000 122,848 ### ###
Mandor ( Oh ) 0.06 185,000 11,056 ### ###
Pasir beton ( M3 0.36 250,000 89,743 ### ###
F01
[ 814,1 kg / 2 hari ] Pekerj 879.27 92,250 10,034,555 ### ###
Pekerja ( OH ) 5.70 85,000 484,368 ### ###
Kepala Tukang ( 0.57 150,000 85,477 ### ###
Tukang Besi ( OH 5.70 100,000 569,845 ### ###
Besi beton ( kg ) 854.77 10,000 8,547,668 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kawat beton ( kg 12.21 23,500 286,957 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 0.33 185,000 60,241 ### ###
F02
[ 44,8 m2 / 5 hari ] Pekerjaan 182.07 619,075 16,950,304 ### ###
Pekerja ( OH ) 29.57 85,000 2,513,280 ### ###

300/396
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
Tukang Kayu ( OH 14.78 100,000 1,478,400 ### ###
Kepala Tukang ( 1.48 150,000 221,760 ### ###
Paku Biasa 2" - 5" 17.92 25,000 448,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dolken kayu Ø 8- 89.60 25,000 2,240,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Minyak bekisting ( 8.96 45,750 409,920 ### ###
Plywood 120x240 15.68 175,000 2,744,000 ### ###
Balok Kayu 4x6-K.I 0.81 3,100,000 2,499,840 ### ###
Papan Kayu 2x20-K 1.79 2,300,000 4,121,600 ### ###
Mandor ( Oh ) 1.48 185,000 273,504 ### ###
F03
[ 4,5 m3 / 1 hari ] Pekerjaan 2640.11 123,919 4,370,778 ### ###
Pekerja ( OH ) 7.39 85,000 628,320 ### ###
Kepala Tukang ( 0.13 150,000 18,816 ### ###
Tukang Batu ( OH 1.23 100,000 123,200 ### ###
Semen ( kg ) 1662.08 1,300 2,160,704 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Air ( Ltr ) 963.20 50 48,160 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kerikil ( m3 ) 3.47 220,000 764,388 ### ###
Mandor ( Oh ) 0.37 185,000 68,790 ### ###
Pasir beton ( M3 2.23 250,000 558,400 ### ###
F04
[ 136,3 kg / 1 hari ] Pekerj 147.18 92,250 1,679,632 ### ###
Pekerja ( OH ) 0.95 85,000 81,076 ### ###
Kepala Tukang ( 0.10 150,000 14,307 ### ###
Tukang Besi ( OH 0.95 100,000 95,383 ### ###
Besi beton ( kg ) 143.07 10,000 1,430,750 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kawat beton ( kg 2.04 23,500 48,032 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 0.05 185,000 10,083 ### ###
F05
[ 12,8 m2 / 2 hari ] Pekerjaan 52.02 619,075 4,842,944 ### ###
Pekerja ( OH ) 8.45 85,000 718,080 ### ###
Tukang Kayu ( OH 4.22 100,000 422,400 ### ###
Kepala Tukang ( 0.42 150,000 63,360 ### ###
Paku Biasa 2" - 5" 5.12 25,000 128,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dolken kayu Ø 8- 25.60 25,000 640,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Minyak bekisting ( 2.56 45,750 117,120 ### ###
Plywood 120x240 4.48 175,000 784,000 ### ###
Balok Kayu 4x6-K.I 0.23 3,100,000 714,240 ### ###
Papan Kayu 2x20-K 0.51 2,300,000 1,177,600 ### ###
Mandor ( Oh ) 0.42 185,000 78,144 ### ###
F06
[ 1 m3 / 1 hari ] Pekerjaan Co 565.74 123,919 936,595 ### ###
Pekerja ( OH ) 1.58 85,000 134,640 ### ###
Kepala Tukang ( 0.03 150,000 4,032 ### ###
Tukang Batu ( OH 0.26 100,000 26,400 ### ###
Semen ( kg ) 356.16 1,300 463,008 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Air ( Ltr ) 206.40 50 10,320 ### ###
Kerikil ( m3 ) 0.74 220,000 163,797 ### ###
Mandor ( Oh ) 0.08 185,000 14,741 ### ###
Pasir beton ( M3 0.48 250,000 119,657 ### ###
F07
[ 506,9 kg / 1 hari ] Pekerj 547.49 92,250 6,248,180 ### ###
Pekerja ( OH ) 3.55 85,000 301,600 ### ###

301/396
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
Kepala Tukang ( 0.35 150,000 53,223 ### ###
Tukang Besi ( OH 3.55 100,000 354,823 ### ###
Besi beton ( kg ) 532.23 10,000 5,322,346 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kawat beton ( kg 7.60 23,500 178,679 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 0.20 185,000 37,510 ### ###
F08
[ 34,4 m2 / 4 hari ] Pekerjaan 139.80 619,075 13,015,412 ### ###
Pekerja ( OH ) 22.70 85,000 1,929,840 ### ###
Tukang Kayu ( OH 11.35 100,000 1,135,200 ### ###
Kepala Tukang ( 1.14 150,000 170,280 ### ###
Paku Biasa 2" - 5" 13.76 25,000 344,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dolken kayu Ø 8- 68.80 25,000 1,720,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Minyak bekisting ( 6.88 45,750 314,760 ### ###
Plywood 120x240 12.04 175,000 2,107,000 ### ###
Balok Kayu 4x6-K.I 0.62 3,100,000 1,919,520 ### ###
Papan Kayu 2x20-K 1.38 2,300,000 3,164,800 ### ###
Mandor ( Oh ) 1.14 185,000 210,012 ### ###
F09
[ 4,3 m3 / 1 hari ] Pekerjaan 2534.03 123,919 4,195,166 ### ###
Pekerja ( OH ) 7.10 85,000 603,075 ### ###
Kepala Tukang ( 0.12 150,000 18,060 ### ###
Tukang Batu ( OH 1.18 100,000 118,250 ### ###
Semen ( kg ) 1595.30 1,300 2,073,890 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Air ( Ltr ) 924.50 50 46,225 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kerikil ( m3 ) 3.33 220,000 733,676 ### ###
Mandor ( Oh ) 0.36 185,000 66,027 ### ###
Pasir beton ( M3 2.14 250,000 535,964 ### ###
F10
[ 106,6 kg / 1 hari ] Pekerj 115.05 92,250 1,313,042 ### ###
Pekerja ( OH ) 0.75 85,000 63,381 ### ###
Kepala Tukang ( 0.07 150,000 11,185 ### ###
Tukang Besi ( OH 0.75 100,000 74,565 ### ###
Besi beton ( kg ) 111.85 10,000 1,118,479 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kawat beton ( kg 1.60 23,500 37,549 ### ###
Mandor ( Oh ) 0.04 185,000 7,883 ### ###
F11
[ 10 m2 / 2 hari ] Pekerjaan B 40.64 619,075 3,783,550 ### ###
Pekerja ( OH ) 6.60 85,000 561,000 ### ###
Tukang Kayu ( OH 3.30 100,000 330,000 ### ###
Kepala Tukang ( 0.33 150,000 49,500 ### ###
Paku Biasa 2" - 5" 4.00 25,000 100,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dolken kayu Ø 8- 20.00 25,000 500,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Minyak bekisting ( 2.00 45,750 91,500 ### ###
Plywood 120x240 3.50 175,000 612,500 ### ###
Balok Kayu 4x6-K.I 0.18 3,100,000 558,000 ### ###
Papan Kayu 2x20-K 0.40 2,300,000 920,000 ### ###
Mandor ( Oh ) 0.33 185,000 61,050 ### ###
F12
[ 0,8 m3 / 1 hari ] Pekerjaan 441.98 123,919 731,715 ### ###
Pekerja ( OH ) 1.24 85,000 105,188 ### ###
Kepala Tukang ( 0.02 150,000 3,150 ### ###
Tukang Batu ( OH 0.21 100,000 20,625 ### ###

302/396
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
Semen ( kg ) 278.25 1,300 361,725 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Air ( Ltr ) 161.25 50 8,063 ### ###
Kerikil ( m3 ) 0.58 220,000 127,967 ### ###
Mandor ( Oh ) 0.06 185,000 11,516 ### ###
Pasir beton ( M3 0.37 250,000 93,482 ### ###
G01
[ 1989,3 kg / 4 hari ] Pekerja 2148.63 92,250 24,521,015 ### ###
Pekerja ( OH ) 13.93 85,000 1,183,629 ### ###
Kepala Tukang ( 1.39 150,000 208,876 ### ###
Tukang Besi ( OH 13.93 100,000 1,392,505 ### ###
Besi beton ( kg ) 2088.76 10,000 20,887,572 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kawat beton ( kg 29.84 23,500 701,226 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 0.80 185,000 147,208 ### ###
G02
[ 90 m2 / 10 hari ] Pekerjaan 725.49 619,075 42,214,950 ### ###
Pekerja ( OH ) 59.40 85,000 5,049,000 ### ###
Tukang Kayu ( OH 29.70 100,000 2,970,000 ### ###
Kepala Tukang ( 2.97 150,000 445,500 ### ###
Paku Biasa 2" - 5" 36.00 25,000 900,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dolken kayu Ø 8- 540.00 25,000 13,500,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Minyak bekisting ( 18.00 45,750 823,500 ### ###
Plywood 120x240 31.50 175,000 5,512,500 ### ###
Balok Kayu 4x6-K.I 1.35 3,100,000 4,185,000 ### ###
Papan Kayu 2x20-K 3.60 2,300,000 8,280,000 ### ###
Mandor ( Oh ) 2.97 185,000 549,450 ### ###
G03
[ 11,7 m3 / 3 hari ] Pekerjaa 6894.93 123,919 11,414,755 ### ###
Pekerja ( OH ) 19.31 85,000 1,640,925 ### ###
Kepala Tukang ( 0.33 150,000 49,140 ### ###
Tukang Batu ( OH 3.22 100,000 321,750 ### ###
Semen ( kg ) 4340.70 1,300 5,642,910 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Air ( Ltr ) 2515.50 50 125,775 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kerikil ( m3 ) 9.07 220,000 1,996,280 ### ###
Mandor ( Oh ) 0.97 185,000 179,654 ### ###
Pasir beton ( M3 5.83 250,000 1,458,321 ### ###
G04
[ 48,1 kg / 1 hari ] Pekerjaa 51.92 92,250 592,480 ### ###
Pekerja ( OH ) 0.34 85,000 28,599 ### ###
Kepala Tukang ( 0.03 150,000 5,047 ### ###
Tukang Besi ( OH 0.34 100,000 33,646 ### ###
Besi beton ( kg ) 50.47 10,000 504,688 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kawat beton ( kg 0.72 23,500 16,943 ### ###
Mandor ( Oh ) 0.02 185,000 3,557 ### ###
G05
[ 6 m2 / 1 hari ] Pekerjaan Bek 48.37 619,075 2,814,330 ### ###
Pekerja ( OH ) 3.96 85,000 336,600 ### ###
Tukang Kayu ( OH 1.98 100,000 198,000 ### ###
Kepala Tukang ( 0.20 150,000 29,700 ### ###
Paku Biasa 2" - 5" 2.40 25,000 60,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dolken kayu Ø 8- 36.00 25,000 900,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Minyak bekisting ( 1.20 45,750 54,900 ### ###
Plywood 120x240 2.10 175,000 367,500 ### ###

303/396
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
Balok Kayu 4x6-K.I 0.09 3,100,000 279,000 ### ###
Papan Kayu 2x20-K 0.24 2,300,000 552,000 ### ###
Mandor ( Oh ) 0.20 185,000 36,630 ### ###
G06
[ 0,6 m3 / 1 hari ] Pekerjaan 353.59 123,919 585,372 ### ###
Pekerja ( OH ) 0.99 85,000 84,150 ### ###
Kepala Tukang ( 0.02 150,000 2,520 ### ###
Tukang Batu ( OH 0.17 100,000 16,500 ### ###
Semen ( kg ) 222.60 1,300 289,380 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Air ( Ltr ) 129.00 50 6,450 ### ###
Kerikil ( m3 ) 0.47 220,000 102,373 ### ###
Mandor ( Oh ) 0.05 185,000 9,213 ### ###
Pasir beton ( M3 0.30 250,000 74,786 ### ###
H01
[ 146,3 m2 / 7 hari ] Pek. Pa 11721.14 110,993 15,989,004 ### ###
Pekerja ( OH ) 43.87 85,000 3,729,120 ### ###
Kepala Tukang ( 1.46 150,000 219,360 ### ###
Tukang Batu ( OH 14.62 100,000 1,462,400 ### ###
Semen ( kg ) 1415.60 1,300 1,840,284 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pasir Pasang ( m3 6.58 255,000 1,678,104 ### ###
Bata merah ( bh ) 10236.80 650 6,653,920 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 2.19 185,000 405,816 ### ###
H02
[ 14,7 m2 / 1 hari ] Pek. Pas 1240.63 110,993 1,669,417 ### ###
Pekerja ( OH ) 4.39 85,000 372,912 ### ###
Kepala Tukang ( 0.15 150,000 21,936 ### ###
Tukang Batu ( OH 1.46 100,000 146,240 ### ###
Semen ( kg ) 210.15 1,300 273,191 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pasir Pasang ( m3 0.58 255,000 149,165 ### ###
Bata merah ( bh ) 1023.68 650 665,392 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 0.22 185,000 40,582 ### ###
H03
[ 292,5 m2 / 15 hari ] Pekerja 1664.21 129,383 17,225,376 ### ###
Pekerja ( OH ) 87.74 85,000 7,458,240 ### ###
Kepala Tukang ( 4.39 150,000 658,080 ### ###
Tukang Batu ( OH 43.87 100,000 4,387,200 ### ###
Semen ( kg ) 1516.22 1,300 1,971,081 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pasir Pasang ( m3 7.60 255,000 1,939,142 ### ###
Mandor ( Oh ) 4.39 185,000 811,632 ### ###
H04
[ 292,5 m2 / 10 hari ] Pekerj 1044.15 104,260 10,112,496 ### ###
Pekerja ( OH ) 58.50 85,000 4,972,160 ### ###
Kepala Tukang ( 2.92 150,000 438,720 ### ###
Tukang Batu ( OH 29.25 100,000 2,924,800 ### ###
Semen ( kg ) 950.56 1,300 1,235,728 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 2.92 185,000 541,088 ### ###
H05
[ 134 m2 / 6 hari ] Pek. Pasa 10740.10 110,993 14,650,756 ### ###
Pekerja ( OH ) 40.20 85,000 3,417,000 ### ###
Kepala Tukang ( 1.34 150,000 201,000 ### ###
Tukang Batu ( OH 13.40 100,000 1,340,000 ### ###
Semen ( kg ) 1297.12 1,300 1,686,256 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

304/396
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
Pasir Pasang ( m3 6.03 255,000 1,537,650 ### ###
Bata merah ( bh ) 9380.00 650 6,097,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 2.01 185,000 371,850 ### ###
H06
[ 13,4 m2 / 1 hari ] Pek. Pas 1136.79 110,993 1,529,690 ### ###
Pekerja ( OH ) 4.02 85,000 341,700 ### ###
Kepala Tukang ( 0.13 150,000 20,100 ### ###
Tukang Batu ( OH 1.34 100,000 134,000 ### ###
Semen ( kg ) 192.56 1,300 250,325 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pasir Pasang ( m3 0.54 255,000 136,680 ### ###
Bata merah ( bh ) 938.00 650 609,700 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 0.20 185,000 37,185 ### ###
H07
[ 268 m2 / 13 hari ] Pekerjaa 1524.92 129,383 15,783,646 ### ###
Pekerja ( OH ) 80.40 85,000 6,834,000 ### ###
Kepala Tukang ( 4.02 150,000 603,000 ### ###
Tukang Batu ( OH 40.20 100,000 4,020,000 ### ###
Semen ( kg ) 1389.31 1,300 1,806,106 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pasir Pasang ( m3 6.97 255,000 1,776,840 ### ###
Mandor ( Oh ) 4.02 185,000 743,700 ### ###
H08
[ 268 m2 / 9 hari ] Pekerjaan 956.76 104,260 9,266,100 ### ###
Pekerja ( OH ) 53.60 85,000 4,556,000 ### ###
Kepala Tukang ( 2.68 150,000 402,000 ### ###
Tukang Batu ( OH 26.80 100,000 2,680,000 ### ###
Semen ( kg ) 871.00 1,300 1,132,300 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 2.68 185,000 495,800 ### ###
I01
[ 161,6 m2 / 12 hari ] Memas 8005.69 64,528 34,564,680 ### ###
Pekerja ( OH ) 32.31 85,000 2,746,434 ### ###
Kepala Tukang ( 1.62 150,000 242,332 ### ###
Tukang Besi ( OH 72.70 100,000 7,269,972 ### ###
Baja Ringan-C Trus 600.98 13,333 8,013,125 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Baut Ramset / Din 258.49 15,000 3,877,319 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Truss Screw ( bh ) 6139.09 750 4,604,316 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Baja Ringan-Reng 872.40 6,667 5,815,978 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Talang Jurai ( m' ) 20.03 25,000 500,820 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 8.08 185,000 1,494,383 ### ###
I02
[ 161,6 m2 / 6 hari ] Memasa 292.58 109,250 28,915,912 ### ###
Pekerja ( OH ) 32.31 85,000 2,746,434 ### ###
Tukang Kayu ( OH 16.16 100,000 1,615,549 ### ###
Kepala Tukang ( 1.62 150,000 242,332 ### ###
Atap Genteng Met 210.02 112,000 23,522,400 ### ###
Mandor ( Oh ) 0.16 185,000 29,888 ### ###
Paku Biasa ½" - 1" 32.31 23,500 759,308 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
I03
[ 27 m1 / 2 hari ] Memasang 42.46 104,667 3,591,128 ### ###
Pekerja ( OH ) 6.73 85,000 571,814 ### ###
Tukang Kayu ( OH 4.04 100,000 403,634 ### ###
Kepala Tukang ( 0.40 150,000 60,545 ### ###
Paku Biasa 2" - 5" 1.35 25,000 33,636 ### ###

305/396
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
nok genteng metal 29.60 83,000 2,456,783 ### ###
Mandor ( Oh ) 0.35 185,000 64,716 ### ###
I04
[ 50 m1 / 2 hari ] Memasang L 21.79 1,540,833 6,444,250 ### ###
Pekerja ( OH ) 5.00 85,000 425,000 ### ###
Tukang Kayu ( OH 10.00 100,000 1,000,000 ### ###
Kepala Tukang ( 1.00 150,000 150,000 ### ###
Paku Biasa 2" - 5" 5.00 25,000 125,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Papan Kayu 2x20-K 0.54 8,700,000 4,698,000 ### ###
Mandor ( Oh ) 0.25 185,000 46,250 ### ###
I05
[ 50 m1 / 3 hari ] Memasang T 79.90 89,643 4,861,500 ### ###
Pekerja ( OH ) 7.50 85,000 637,500 ### ###
Kepala Tukang ( 1.50 150,000 225,000 ### ###
Paku Biasa 2" - 5" 0.50 25,000 12,500 ### ###
Baja strip (0,2 x 2 25.00 12,500 312,500 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Tukang Atap ( OH 15.00 100,000 1,500,000 ### ###
Mandor ( Oh ) 0.40 185,000 74,000 ### ###
Seng Gelombang 3" 30.00 70,000 2,100,000 ### ###
J01
[ 2 unit / 1 hari ] Memasang 5.60 544,000 4,682,000 ### ###
Pekerja ( OH ) 1.00 85,000 85,000 ### ###
Tukang Kayu ( OH 1.60 100,000 160,000 ### ###
Pintu Utama (Kuse 2.00 2,100,000 4,200,000 ### ###
Perlengkapan Umu 0.80 250,000 200,000 ### ###
Mandor ( Oh ) 0.20 185,000 37,000 ### ###
J02
[ 7 unit / 2 hari ] Memasang 19.60 444,000 12,887,000 ### ###
Pekerja ( OH ) 3.50 85,000 297,500 ### ###
Tukang Kayu ( OH 5.60 100,000 560,000 ### ###
Pintu Utama (Kuse 7.00 1,600,000 11,200,000 ### ###
Perlengkapan Umu 2.80 250,000 700,000 ### ###
Mandor ( Oh ) 0.70 185,000 129,500 ### ###
J03
[ 3 unit / 1 hari ] Memasang 8.40 344,000 4,023,000 ### ###
Pekerja ( OH ) 1.50 85,000 127,500 ### ###
Tukang Kayu ( OH 2.40 100,000 240,000 ### ###
Pintu Utama (Kuse 3.00 1,100,000 3,300,000 ### ###
Perlengkapan Umu 1.20 250,000 300,000 ### ###
Mandor ( Oh ) 0.30 185,000 55,500 ### ###
J04
[ 4 unit / 1 hari ] Memasang 8.60 320,000 4,499,000 ### ###
Pekerja ( OH ) 1.20 85,000 102,000 ### ###
Tukang Kayu ( OH 2.40 100,000 240,000 ### ###
Jendela Type J1 ( 4.00 980,000 3,920,000 ### ###
Perlengkapan Umu 0.80 250,000 200,000 ### ###
Mandor ( Oh ) 0.20 185,000 37,000 ### ###
J05
[ 3 unit / 1 hari ] Memasang 8.31 244,000 2,506,350 ### ###
Pekerja ( OH ) 1.50 85,000 127,500 ### ###
Tukang Kayu ( OH 2.40 100,000 240,000 ### ###
Jendela Type J2 ( 3.00 600,000 1,800,000 ### ###

306/396
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
Perlengkapan Umu 1.20 250,000 300,000 ### ###
Mandor ( Oh ) 0.21 185,000 38,850 ### ###
J06
[ 28 unit / 1 hari ] Memasang 30.24 129,100 999,600 ### ###
Pekerja ( OH ) 0.28 85,000 23,800 ### ###
Tukang Batu ( OH 1.40 100,000 140,000 ### ###
Lubang Angin ( Un 28.00 25,500 714,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Perlengkapan Umu 0.28 250,000 70,000 ### ###
Mandor ( Oh ) 0.28 185,000 51,800 ### ###
K01
[ 66 m1 / 1 hari ] Memasang I 109.16 90,917 1,579,380 ### ###
Pekerja ( OH ) 2.38 85,000 201,960 ### ###
Kepala Tukang ( 0.40 150,000 59,400 ### ###
Tukang Batu ( OH 3.96 100,000 396,000 ### ###
Pipa PVC 3/4" ( M 79.20 5,500 435,600 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Perlengkapan Umu 23.10 20,000 462,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 0.13 185,000 24,420 ### ###
K02
[ 35 m1 / 1 hari ] Memasang I 57.89 90,667 774,550 ### ###
Pekerja ( OH ) 1.26 85,000 107,100 ### ###
Kepala Tukang ( 0.21 150,000 31,500 ### ###
Tukang Batu ( OH 2.10 100,000 210,000 ### ###
Pipa PVC 1/2" ( M 42.00 4,000 168,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Perlengkapan Umu 12.25 20,000 245,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 0.07 185,000 12,950 ### ###
K03
[ 6 bh / 1 hari ] Memasang Ke 8.88 91,583 437,325 ### ###
Pekerja ( OH ) 0.06 85,000 5,100 ### ###
Kepala Tukang ( 0.24 150,000 36,000 ### ###
Tukang Batu ( OH 2.40 100,000 240,000 ### ###
Kran air ( M ) 6.00 25,000 150,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sealtape ( bh ) 0.15 4,500 675 ### ###
Mandor ( Oh ) 0.03 185,000 5,550 ### ###
K04
[ 4 Unit / 3 hari ] Memasang 291.16 103,059 5,886,012 ### ###
Pekerja ( OH ) 12.40 85,000 1,054,406 ### ###
Kepala Tukang ( 0.01 150,000 1,068 ### ###
Tukang Batu ( OH 12.07 100,000 1,206,994 ### ###
Semen ( kg ) 94.36 1,300 122,668 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pasir Pasang ( m3 0.14 255,000 34,823 ### ###
Kawat beton ( kg 4.86 23,500 114,304 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Air ( Ltr ) 54.68 50 2,734 ### ###
Kerikil ( m3 ) 0.19 220,000 41,846 ### ###
Pipa PVC 3" ( m1 12.00 8,000 96,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
T Bow 3" ( bh ) 8.00 35,000 280,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pelat 1/8" ( m2 ) 2.54 265,000 674,001 ### ###
Baut M10 ( bh ) 12.00 5,000 60,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Buis beton D. 80 12.00 62,000 744,000 ### ###
Besi Ø8 (Polos) ( 60.80 4,091 248,727 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Perlengkapan Umu 4.00 250,000 1,000,000 ### ###
Mandor ( Oh ) 1.11 185,000 204,439 ### ###
K05

307/396
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
[ 1 unit / 1 hari ] Memasang 1.43 216,000 516,625 ### ###
Pekerja ( OH ) 0.20 85,000 17,000 ### ###
Shower Mandi ( U 1.00 460,000 460,000 ### ###
Tukang Pipa ( Oh 0.10 100,000 10,000 ### ###
Perlengkapan Umu 0.10 250,000 25,000 ### ###
Mandor ( Oh ) 0.03 185,000 4,625 ### ###
K06
[ 66 m1 / 2 hari ] Memasang I 117.71 91,333 2,623,500 ### ###
Pekerja ( OH ) 5.35 85,000 454,410 ### ###
Kepala Tukang ( 0.89 150,000 133,650 ### ###
Tukang Batu ( OH 8.91 100,000 891,000 ### ###
Pipa PVC 3" ( m1 79.20 8,000 633,600 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Perlengkapan Umu 23.10 20,000 462,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 0.26 185,000 48,840 ### ###
K07
[ 36 m1 / 1 hari ] Memasang I 64.21 91,500 1,474,200 ### ###
Pekerja ( OH ) 2.92 85,000 247,860 ### ###
Kepala Tukang ( 0.49 150,000 72,900 ### ###
Tukang Batu ( OH 4.86 100,000 486,000 ### ###
Pipa PVC 4" ( m1 43.20 9,000 388,800 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Perlengkapan Umu 12.60 20,000 252,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 0.14 185,000 26,640 ### ###
K08
[ 1 bh / 1 hari ] Memasang K 5.63 545,000 2,936,600 ### ###
Pekerja ( OH ) 3.30 85,000 280,500 ### ###
Kepala Tukang ( 0.01 150,000 1,500 ### ###
Tukang Batu ( OH 1.10 100,000 110,000 ### ###
Kloset Duduk ( Un 1.00 2,500,000 2,500,000 ### ###
Perlengkapan Umu 0.06 250,000 15,000 ### ###
Mandor ( Oh ) 0.16 185,000 29,600 ### ###
K09
[ 1 bh / 1 hari ] Memasang Kl 9.82 146,614 547,450 ### ###
Pekerja ( OH ) 1.00 85,000 85,000 ### ###
Kepala Tukang ( 0.15 150,000 22,500 ### ###
Tukang Batu ( OH 1.50 100,000 150,000 ### ###
Semen ( kg ) 6.00 1,300 7,800 ### ###
Pasir Pasang ( m3 0.01 255,000 2,550 ### ###
Kloset Jongkok ( U 1.00 250,000 250,000 ### ###
Mandor ( Oh ) 0.16 185,000 29,600 ### ###
K10
[ 2 bh / 1 hari ] Memasang Wa 19.98 259,538 2,741,900 ### ###
Pekerja ( OH ) 2.40 85,000 204,000 ### ###
Kepala Tukang ( 0.30 150,000 45,000 ### ###
Tukang Batu ( OH 2.90 100,000 290,000 ### ###
Semen ( kg ) 12.00 1,300 15,600 ### ###
Pasir Pasang ( m3 0.02 255,000 5,100 ### ###
Wastafel ( Unit ) 2.00 1,050,000 2,100,000 ### ###
Perlengkapan Umu 0.24 250,000 60,000 ### ###
Mandor ( Oh ) 0.12 185,000 22,200 ### ###
K11
[ 3 bh / 1 hari ] Memasang Fl 3.38 116,000 219,825 ### ###
Pekerja ( OH ) 0.03 85,000 2,550 ### ###

308/396
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
Kepala Tukang ( 0.03 150,000 4,500 ### ###
Tukang Batu ( OH 0.30 100,000 30,000 ### ###
Floor drain ( Unit 3.00 60,000 180,000 ### ###
Mandor ( Oh ) 0.02 185,000 2,775 ### ###
K12
[ 1 unit / 2 hari ] Pekerjaan 930.95 89,607 3,040,999 ### ###
Pekerja ( OH ) 9.33 85,000 792,744 ### ###
Kepala Tukang ( 0.33 150,000 49,378 ### ###
Tukang Batu ( OH 3.29 100,000 329,120 ### ###
Semen ( kg ) 276.34 1,300 359,248 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pasir Pasang ( m3 0.63 255,000 161,141 ### ###
Bata merah ( bh ) 599.20 650 389,480 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kawat beton ( kg 1.92 23,500 45,120 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kerikil ( m3 ) 0.10 220,000 21,060 ### ###
Pipa PVC 4" ( m1 3.00 9,000 27,000 ### ###
Pipa PVC 3" ( m1 4.00 8,000 32,000 ### ###
Pipa PVC 1” ( m1 1.00 6,000 6,000 ### ###
T Bow 4" ( bh ) 1.00 65,000 65,000 ### ###
T Bow 3" ( bh ) 1.00 35,000 35,000 ### ###
Dop 3" ( bh ) 1.00 35,000 35,000 ### ###
Pelat 1/8" ( m2 ) 0.16 265,000 42,400 ### ###
Baut M10 ( bh ) 3.00 5,000 15,000 ### ###
Besi Ø8 (Polos) ( 23.36 4,091 95,564 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Perlengkapan Umu 1.80 250,000 450,000 ### ###
Mandor ( Oh ) 0.49 185,000 90,745 ### ###
K13
[ 1 Unit / 1 hari ] Pekerjaan 72.79 103,059 1,471,503 ### ###
Pekerja ( OH ) 3.10 85,000 263,602 ### ###
Kepala Tukang ( 0.00 150,000 267 ### ###
Tukang Batu ( OH 3.02 100,000 301,749 ### ###
Semen ( kg ) 23.59 1,300 30,667 ### ###
Pasir Pasang ( m3 0.03 255,000 8,706 ### ###
Kawat beton ( kg 1.22 23,500 28,576 ### ###
Air ( Ltr ) 13.67 50 684 ### ###
Kerikil ( m3 ) 0.05 220,000 10,462 ### ###
Pipa PVC 3" ( m1 3.00 8,000 24,000 ### ###
T Bow 3" ( bh ) 2.00 35,000 70,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pelat 1/8" ( m2 ) 0.64 265,000 168,500 ### ###
Baut M10 ( bh ) 3.00 5,000 15,000 ### ###
Buis beton D. 80 3.00 62,000 186,000 ### ###
Besi Ø8 (Polos) ( 15.20 4,091 62,182 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Perlengkapan Umu 1.00 250,000 250,000 ### ###
Mandor ( Oh ) 0.28 185,000 51,110 ### ###
L01
[ 2 Unit / 1 hari ] Pemasan 4.04 194,000 1,015,400 ### ###
Pekerja ( OH ) 0.80 85,000 68,000 ### ###
MCB + Box ( Unit 2.00 350,000 700,000 ### ###
Tukang Listrik ( O 0.40 100,000 40,000 ### ###
Perlengkapan Umu 0.80 250,000 200,000 ### ###
Mandor ( Oh ) 0.04 185,000 7,400 ### ###
L02
[ 1 btg / 1 hari ] Pemasanga 2.02 254,000 807,700 ### ###

309/396
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
Pekerja ( OH ) 0.40 85,000 34,000 ### ###
Tukang Listrik ( O 0.20 100,000 20,000 ### ###
Perlengkapan Umu 0.40 250,000 100,000 ### ###
Grounding Rod ( b 1.00 650,000 650,000 ### ###
Mandor ( Oh ) 0.02 185,000 3,700 ### ###
L03
[ 132 m1 / 1 hari ] Pemasang 151.40 126,080 2,410,320 ### ###
Pekerja ( OH ) 2.64 85,000 224,400 ### ###
Tukang Listrik ( O 1.32 100,000 132,000 ### ###
Kabel NYM 3x2,5 145.20 10,400 1,510,080 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Perlengkapan Umu 1.98 250,000 495,000 ### ###
Mandor ( Oh ) 0.26 185,000 48,840 ### ###
L04
[ 276 m1 / 2 hari ] Pemasang 315.19 125,120 3,237,480 ### ###
Pekerja ( OH ) 5.52 85,000 469,200 ### ###
Tukang Listrik ( O 2.76 100,000 276,000 ### ###
Kabel NYM 2x1,5 303.60 5,600 1,700,160 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Perlengkapan Umu 2.76 250,000 690,000 ### ###
Mandor ( Oh ) 0.55 185,000 102,120 ### ###
L05
[ 16 Unit / 1 hari ] Pemasang 17.31 129,000 572,320 ### ###
Pekerja ( OH ) 0.64 85,000 54,400 ### ###
Tukang Listrik ( O 0.32 100,000 32,000 ### ###
Fitting Lampu ( un 16.00 25,000 400,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Perlengkapan Umu 0.32 250,000 80,000 ### ###
Mandor ( Oh ) 0.03 185,000 5,920 ### ###
L06
[ 8 unit / 1 hari ] Pemasanga 8.69 129,000 294,160 ### ###
Pekerja ( OH ) 0.32 85,000 27,200 ### ###
Tukang Listrik ( O 0.16 100,000 16,000 ### ###
Saklar Listrik ( uni 8.00 25,000 200,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Perlengkapan Umu 0.19 250,000 48,000 ### ###
Mandor ( Oh ) 0.02 185,000 2,960 ### ###
L07
[ 8 unit / 1 hari ] Pemasangan 8.71 130,000 337,520 ### ###
Pekerja ( OH ) 0.34 85,000 28,560 ### ###
Tukang Listrik ( O 0.16 100,000 16,000 ### ###
Receiptackle ( uni 8.00 30,000 240,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Perlengkapan Umu 0.20 250,000 50,000 ### ###
Mandor ( Oh ) 0.02 185,000 2,960 ### ###
L08
[ 5 unit / 1 hari ] Pasang Lam 5.31 128,800 155,425 ### ###
Pekerja ( OH ) 0.20 85,000 17,000 ### ###
Tukang Listrik ( O 0.05 100,000 5,000 ### ###
Lampu 5W ( unit 5.00 24,000 120,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Perlengkapan Umu 0.05 250,000 12,500 ### ###
Mandor ( Oh ) 0.01 185,000 925 ### ###
L09
[ 8 unit / 1 hari ] Pasang La 8.49 131,800 368,680 ### ###
Pekerja ( OH ) 0.32 85,000 27,200 ### ###
Tukang Listrik ( O 0.08 100,000 8,000 ### ###
Lampu 15W ( unit 8.00 39,000 312,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

310/396
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
Perlengkapan Umu 0.08 250,000 20,000 ### ###
Mandor ( Oh ) 0.01 185,000 1,480 ### ###
L10
[ 3 unit / 1 hari ] Pasang La 3.18 133,000 156,255 ### ###
Pekerja ( OH ) 0.12 85,000 10,200 ### ###
Tukang Listrik ( O 0.03 100,000 3,000 ### ###
Lampu 20W ( unit 3.00 45,000 135,000 ### ###
Perlengkapan Umu 0.03 250,000 7,500 ### ###
Mandor ( Oh ) 0.00 185,000 555 ### ###
M01
[ 9,5 unit / 1 hari ] Pekerjaa 10.01 133,000 491,162 ### ###
Pekerja ( OH ) 0.38 85,000 32,062 ### ###
Tukang Listrik ( O 0.09 100,000 9,430 ### ###
Lampu 20W ( unit 9.43 45,000 424,350 ### ###
Perlengkapan Umu 0.09 250,000 23,575 ### ###
Mandor ( Oh ) 0.01 185,000 1,745 ### ###
M02
[ 158 m2 / 7 hari ] Memasang 1987.48 123,913 46,274,250 ### ###
Pekerja ( OH ) 37.92 85,000 3,223,200 ### ###
Kepala Tukang ( 1.90 150,000 284,400 ### ###
Tukang Batu ( OH 18.96 100,000 1,896,000 ### ###
Semen ( kg ) 1516.80 1,300 1,971,840 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pasir Pasang ( m3 7.11 255,000 1,813,050 ### ###
Semen Warna ( Kg 237.00 15,000 3,555,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Keramik Lantai 60 165.90 200,000 33,180,000 ### ###
Mandor ( Oh ) 1.90 185,000 350,760 ### ###
M03
[ 18 m2 / 1 hari ] Memasang 226.73 112,038 3,457,260 ### ###
Pekerja ( OH ) 4.50 85,000 382,500 ### ###
Kepala Tukang ( 0.23 150,000 35,100 ### ###
Tukang Batu ( OH 2.25 100,000 225,000 ### ###
Semen ( kg ) 176.40 1,300 229,320 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pasir Pasang ( m3 0.81 255,000 206,550 ### ###
Semen Warna ( Kg 23.40 15,000 351,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Keramik Lantai 40 18.90 105,000 1,984,500 ### ###
Mandor ( Oh ) 0.23 185,000 43,290 ### ###
M04
[ 12,6 m2 / 2 hari ] Memasang 172.81 110,788 3,187,170 ### ###
Pekerja ( OH ) 8.82 85,000 749,700 ### ###
Kepala Tukang ( 0.44 150,000 66,150 ### ###
Tukang Batu ( OH 4.41 100,000 441,000 ### ###
Semen ( kg ) 126.00 1,300 163,800 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pasir Pasang ( m3 0.57 255,000 144,585 ### ###
Semen Warna ( Kg 18.90 15,000 283,500 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Keramik Lantai 30 13.23 95,000 1,256,850 ### ###
Mandor ( Oh ) 0.44 185,000 81,585 ### ###
M05
[ 22 m2 / 4 hari ] Memasang 307.08 109,538 6,121,610 ### ###
Pekerja ( OH ) 19.80 85,000 1,683,000 ### ###
Kepala Tukang ( 0.99 150,000 148,500 ### ###
Tukang Batu ( OH 9.90 100,000 990,000 ### ###
Semen ( kg ) 204.60 1,300 265,980 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

311/396
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
Pasir Pasang ( m3 0.40 255,000 100,980 ### ###
Semen Warna ( Kg 46.20 15,000 693,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Keramik Dinding 24.20 85,000 2,057,000 ### ###
Mandor ( Oh ) 0.99 185,000 183,150 ### ###
M06
[ 110 m1 / 3 hari ] Memasang 345.07 100,413 4,737,920 ### ###
Pekerja ( OH ) 9.90 85,000 841,500 ### ###
Kepala Tukang ( 0.99 150,000 148,500 ### ###
Tukang Batu ( OH 9.90 100,000 990,000 ### ###
Semen ( kg ) 125.40 1,300 163,020 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pasir Pasang ( m3 0.33 255,000 84,150 ### ###
Semen Warna ( Kg 11.00 15,000 165,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Plint Keramik 10x 187.00 12,000 2,244,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 0.55 185,000 101,750 ### ###
M07
[ 164 m1 / 3 hari ] Memasang 1045.50 99,225 5,401,340 ### ###
Pekerja ( OH ) 13.12 85,000 1,115,200 ### ###
Kepala Tukang ( 1.31 150,000 196,800 ### ###
Tukang Batu ( OH 13.12 100,000 1,312,000 ### ###
Semen ( kg ) 180.40 1,300 234,520 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pasir Pasang ( m3 0.49 255,000 125,460 ### ###
Semen Warna ( Kg 16.40 15,000 246,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Ballnose Rope Tile 820.00 2,500 2,050,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 0.66 185,000 121,360 ### ###
N01
[ 126 m2 / 10 hari ] Memasan 3278.90 87,611 16,705,080 ### ###
Pekerja ( OH ) 44.10 85,000 3,748,500 ### ###
Kepala Tukang ( 4.41 150,000 661,500 ### ###
Tukang Besi ( OH 44.10 100,000 4,410,000 ### ###
Screw ( bh ) 2268.00 500 1,134,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Perlengkapan Umu 2.52 250,000 630,000 ### ###
Hollow 4/4 Galvan 441.00 7,000 3,087,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hollow 2/4 Galvan 220.50 5,000 1,102,500 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Suspension Rod ( 252.00 6,000 1,512,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 2.27 185,000 419,580 ### ###
N02
[ 126 m2 / 3 hari ] Memasang 79.88 101,292 5,912,613 ### ###
Pekerja ( OH ) 12.60 85,000 1,071,000 ### ###
Tukang Kayu ( OH 6.30 100,000 630,000 ### ###
Kepala Tukang ( 0.63 150,000 94,500 ### ###
Gypsum board 9 m 45.86 87,000 3,990,168 ### ###
Paku sekrup ( kg 13.86 750 10,395 ### ###
Mandor ( Oh ) 0.63 185,000 116,550 ### ###
N03
[ 46 m1 / 1 hari ] Memasang L 53.73 91,312 635,651 ### ###
Pekerja ( OH ) 2.30 85,000 195,500 ### ###
Tukang Kayu ( OH 2.30 100,000 230,000 ### ###
Kepala Tukang ( 0.23 150,000 34,500 ### ###
Paku Biasa 2" - 5" 0.46 25,000 11,500 ### ###
List kayu profil ( 48.30 2,870 138,621 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 0.14 185,000 25,530 ### ###
O01

312/396
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
[ 134 m2 / 2 hari ] Pekerjaan 95.14 89,250 2,010,000 ### ###
Pekerja ( OH ) 2.68 85,000 227,800 ### ###
Kepala Tukang ( 1.34 150,000 201,000 ### ###
Amplas ( Lbr ) 67.00 3,500 234,500 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 1.34 185,000 247,900 ### ###
Plamir ( Kg ) 13.40 12,000 160,800 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Tukang cat ( OH ) 9.38 100,000 938,000 ### ###
O02
[ 176 m2 / 2 hari ] Pekerjaan 126.72 85,500 3,352,800 ### ###
Pekerja ( OH ) 3.52 85,000 299,200 ### ###
Kepala Tukang ( 1.76 150,000 264,000 ### ###
Amplas ( Lbr ) 88.00 3,500 308,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Rol Cat ( ea ) 1.76 25,000 44,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cat Waterproofing 17.60 50,000 880,000 ### ###
Mandor ( Oh ) 1.76 185,000 325,600 ### ###
Tukang cat ( OH ) 12.32 100,000 1,232,000 ### ###
O03
[ 256 m2 / 3 hari ] Pekerjaan 141.39 85,041 5,342,354 ### ###
Pekerja ( OH ) 5.12 85,000 435,200 ### ###
Kepala Tukang ( 1.61 150,000 241,920 ### ###
Cat Dasar Tembok 25.60 39,286 1,005,714 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cat Tembok (Exter 66.56 24,000 1,597,440 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 0.77 185,000 142,080 ### ###
Plamir ( Kg ) 25.60 12,000 307,200 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Tukang cat ( OH ) 16.13 100,000 1,612,800 ### ###
O04
[ 134 m2 / 2 hari ] Pekerjaan 74.01 82,599 2,481,552 ### ###
Pekerja ( OH ) 2.68 85,000 227,800 ### ###
Kepala Tukang ( 0.84 150,000 126,630 ### ###
Cat Dasar Tembok 13.40 26,190 350,952 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cat Tembok (Interi 34.84 20,000 696,800 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 0.40 185,000 74,370 ### ###
Plamir ( Kg ) 13.40 12,000 160,800 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Tukang cat ( OH ) 8.44 100,000 844,200 ### ###
O05
[ 258 m2 / 3 hari ] Pekerjaan 116.69 94,083 4,940,700 ### ###
Pekerja ( OH ) 5.16 85,000 438,600 ### ###
Kepala Tukang ( 1.63 150,000 243,810 ### ###
Cat Plafon ( Kg ) 67.08 32,500 2,180,100 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 0.77 185,000 143,190 ### ###
Plamir ( Kg ) 25.80 12,000 309,600 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Tukang cat ( OH ) 16.25 100,000 1,625,400 ### ###
O06
[ 22 m2 / 1 hari ] Pekerjaan 24.38 68,527 939,070 ### ###
Pekerja ( OH ) 1.54 85,000 130,900 ### ###
Kepala Tukang ( 0.13 150,000 19,800 ### ###
Cat meni ( Kg ) 4.40 16,300 71,720 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cat kayu ( Kg ) 5.72 60,000 343,200 ### ###
Kuas ( Bh ) 0.22 17,000 3,740 ### ###
Amplas ( Lbr ) 4.40 3,500 15,400 ### ###
Cat Dasar Kayu/Be 3.74 65,000 243,100 ### ###
Tinner ( Ltr ) 0.66 60,000 39,600 ### ###

313/396
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
Mandor ( Oh ) 0.07 185,000 12,210 ### ###
Plamir ( Kg ) 3.30 12,000 39,600 ### ###
Tukang cat ( OH ) 0.20 100,000 19,800 ### ###
O07
[ 16 m2 / 1 hari ] Pekerjaan P 5.64 97,500 482,120 ### ###
Pekerja ( OH ) 0.32 85,000 27,200 ### ###
Kepala Tukang ( 0.32 150,000 48,000 ### ###
Kuas ( Bh ) 0.16 17,000 2,720 ### ###
Cat Besi ( Kg ) 1.60 48,000 76,800 ### ###
Mandor ( Oh ) 0.04 185,000 7,400 ### ###
Tukang cat ( OH ) 3.20 100,000 320,000 ### ###
P01
[ 162,8 kg / 1 hari ] Pekerja 175.76 92,250 2,005,800 ### ###
Pekerja ( OH ) 1.14 85,000 96,820 ### ###
Kepala Tukang ( 0.11 150,000 17,086 ### ###
Tukang Besi ( OH 1.14 100,000 113,906 ### ###
Besi beton ( kg ) 170.86 10,000 1,708,587 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kawat beton ( kg 2.44 23,500 57,360 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 0.07 185,000 12,041 ### ###
P02
[ 14,2 m2 / 2 hari ] Pekerjaan 56.52 619,075 4,856,325 ### ###
Pekerja ( OH ) 9.32 85,000 792,512 ### ###
Tukang Kayu ( OH 4.66 100,000 466,184 ### ###
Kepala Tukang ( 0.47 150,000 69,928 ### ###
Paku Biasa 2" - 5" 5.65 25,000 141,268 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dolken kayu Ø 8- 28.25 25,000 706,339 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Minyak bekisting ( 2.12 45,750 96,945 ### ###
Plywood 120x240 4.94 175,000 865,265 ### ###
Balok Kayu 4x6-K.I 0.21 3,100,000 656,895 ### ###
Papan Kayu 2x20-K 0.42 2,300,000 974,747 ### ###
Mandor ( Oh ) 0.47 185,000 86,244 ### ###
P03
[ 3,2 m3 / 1 hari ] Pekerjaan 1883.51 123,919 3,118,207 ### ###
Pekerja ( OH ) 5.27 85,000 448,257 ### ###
Kepala Tukang ( 0.09 150,000 13,424 ### ###
Tukang Batu ( OH 0.88 100,000 87,894 ### ###
Semen ( kg ) 1185.76 1,300 1,541,493 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Air ( Ltr ) 687.17 50 34,358 ### ###
Kerikil ( m3 ) 2.48 220,000 545,331 ### ###
Mandor ( Oh ) 0.27 185,000 49,077 ### ###
Pasir beton ( M3 1.59 250,000 398,375 ### ###
P04
[ 14 m2 / 1 hari ] Pekerjaan Pl 79.26 129,383 820,358 ### ###
Pekerja ( OH ) 4.18 85,000 355,199 ### ###
Kepala Tukang ( 0.21 150,000 31,341 ### ###
Tukang Batu ( OH 2.09 100,000 208,940 ### ###
Semen ( kg ) 72.21 1,300 93,873 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pasir Pasang ( m3 0.36 255,000 92,352 ### ###
Mandor ( Oh ) 0.21 185,000 38,654 ### ###
P05
[ 12,4 m2 / 1 hari ] Pekerjaan 155.56 112,038 2,372,065 ### ###
Pekerja ( OH ) 3.09 85,000 262,438 ### ###

314/396
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
Kepala Tukang ( 0.16 150,000 24,083 ### ###
Tukang Batu ( OH 1.54 100,000 154,375 ### ###
Semen ( kg ) 121.03 1,300 157,339 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pasir Pasang ( m3 0.56 255,000 141,716 ### ###
Semen Warna ( Kg 16.06 15,000 240,825 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Keramik Lantai 40 12.97 105,000 1,361,588 ### ###
Mandor ( Oh ) 0.16 185,000 29,702 ### ###
P06
[ 25 m1 / 1 hari ] Pekerjaan R 159.38 99,225 823,375 ### ###
Pekerja ( OH ) 2.00 85,000 170,000 ### ###
Kepala Tukang ( 0.20 150,000 30,000 ### ###
Tukang Batu ( OH 2.00 100,000 200,000 ### ###
Semen ( kg ) 27.50 1,300 35,750 ### ###
Pasir Pasang ( m3 0.08 255,000 19,125 ### ###
Semen Warna ( Kg 2.50 15,000 37,500 ### ###
Ballnose Rope Tile 125.00 2,500 312,500 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 0.10 185,000 18,500 ### ###
P07
[ 14 m2 / 1 hari ] Pekerjaan P 9.89 89,250 208,940 ### ###
Pekerja ( OH ) 0.28 85,000 23,680 ### ###
Kepala Tukang ( 0.14 150,000 20,894 ### ###
Amplas ( Lbr ) 6.96 3,500 24,376 ### ###
Mandor ( Oh ) 0.14 185,000 25,769 ### ###
Plamir ( Kg ) 1.39 12,000 16,715 ### ###
Tukang cat ( OH ) 0.98 100,000 97,505 ### ###
P08
[ 14 m2 / 1 hari ] Pekerjaan 7.69 82,599 257,958 ### ###
Pekerja ( OH ) 0.28 85,000 23,680 ### ###
Kepala Tukang ( 0.09 150,000 13,163 ### ###
Cat Dasar Tembok 1.39 26,190 36,482 ### ###
Cat Tembok (Interi 3.62 20,000 72,433 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 0.04 185,000 7,731 ### ###
Plamir ( Kg ) 1.39 12,000 16,715 ### ###
Tukang cat ( OH ) 0.88 100,000 87,755 ### ###
P09
[ 9 m1 / 1 hari ] Pekerjaan Ra 77.58 127,917 5,795,400 ### ###
Pekerja ( OH ) 1.80 85,000 153,000 ### ###
Kepala Tukang ( 0.09 150,000 13,500 ### ###
Tukang Besi ( OH 3.15 100,000 315,000 ### ###
Perlengkapan Umu 0.09 250,000 22,500 ### ###
Hollow SS 40x40 23.76 83,333 1,980,000 ### ###
Hollow SS 20x40 36.00 58,333 2,100,000 ### ###
Pipa SS Dia.2" ( m 9.90 82,500 816,750 ### ###
Kawat las listrik ( 1.80 135,000 243,000 ### ###
Sewa alat las ( ja 0.90 150,000 135,000 ### ###
Mandor ( Oh ) 0.09 185,000 16,650 ### ###
Q01
[ 1,5 m3 / 1 hari ] Pekerjaan 1.12 135,000 98,460 ### ###
Pekerja ( OH ) 1.08 85,000 91,800 ### ###
Mandor ( Oh ) 0.04 185,000 6,660 ### ###
Q02
[ 1,1 m3 / 1 hari ] Pasangan 147.15 146,614 885,302 ### ###

315/396
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
Pekerja ( OH ) 1.58 85,000 133,875 ### ###
Kepala Tukang ( 0.08 150,000 11,813 ### ###
Tukang Batu ( OH 0.79 100,000 78,750 ### ###
Semen ( kg ) 142.80 1,300 185,640 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pasir Pasang ( m3 0.57 255,000 145,656 ### ###
Batu belah ( m3 ) 1.26 250,000 315,000 ### ###
Mandor ( Oh ) 0.08 185,000 14,569 ### ###
Q03
[ 21 kg / 1 hari ] Pekerjaan P 22.64 92,250 258,334 ### ###
Pekerja ( OH ) 0.15 85,000 12,470 ### ###
Kepala Tukang ( 0.01 150,000 2,201 ### ###
Tukang Besi ( OH 0.15 100,000 14,670 ### ###
Besi beton ( kg ) 22.01 10,000 220,055 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kawat beton ( kg 0.31 23,500 7,388 ### ###
Mandor ( Oh ) 0.01 185,000 1,551 ### ###
Q04
[ 0,9 m2 / 1 hari ] Pekerjaan B 1.15 412,964 175,037 ### ###
Pekerja ( OH ) 0.47 85,000 39,780 ### ###
Tukang Kayu ( OH 0.23 100,000 23,400 ### ###
Kepala Tukang ( 0.02 150,000 3,510 ### ###
Paku Biasa 2" - 5" 0.27 25,000 6,750 ### ###
Minyak bekisting ( 0.09 45,750 4,118 ### ###
Papan Kayu 2x20-K 0.04 2,300,000 93,150 ### ###
Mandor ( Oh ) 0.02 185,000 4,329 ### ###
Q05
[ 0,2 m3 / 1 hari ] Pekerjaan 76.99 123,919 128,818 ### ###
Pekerja ( OH ) 0.22 85,000 18,934 ### ###
Kepala Tukang ( 0.00 150,000 567 ### ###
Tukang Batu ( OH 0.04 100,000 3,713 ### ###
Semen ( kg ) 47.52 1,300 61,776 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Air ( Ltr ) 29.03 50 1,451 ### ###
Kerikil ( m3 ) 0.10 220,000 22,682 ### ###
Mandor ( Oh ) 0.01 185,000 2,073 ### ###
Pasir beton ( M3 0.07 250,000 17,622 ### ###
Q06
[ 19,3 kg / 1 hari ] Pekerjaa 20.78 92,250 237,106 ### ###
Pekerja ( OH ) 0.13 85,000 11,445 ### ###
Kepala Tukang ( 0.01 150,000 2,020 ### ###
Tukang Besi ( OH 0.13 100,000 13,465 ### ###
Besi beton ( kg ) 20.20 10,000 201,972 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kawat beton ( kg 0.29 23,500 6,780 ### ###
Mandor ( Oh ) 0.01 185,000 1,423 ### ###
Q07
[ 1,4 m2 / 1 hari ] Pekerjaan 5.29 619,075 480,826 ### ###
Pekerja ( OH ) 0.86 85,000 73,090 ### ###
Tukang Kayu ( OH 0.43 100,000 42,994 ### ###
Kepala Tukang ( 0.04 150,000 6,449 ### ###
Paku Biasa 2" - 5" 0.52 25,000 13,029 ### ###
Dolken kayu Ø 8- 2.61 25,000 65,143 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Minyak bekisting ( 0.26 45,750 11,921 ### ###
Plywood 120x240 0.46 175,000 79,800 ### ###
Balok Kayu 4x6-K.I 0.02 3,100,000 60,583 ### ###

316/396
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
Papan Kayu 2x20-K 0.05 2,300,000 119,863 ### ###
Mandor ( Oh ) 0.04 185,000 7,954 ### ###
Q08
[ 0,2 m3 / 1 hari ] Pekerjaan 69.66 123,919 116,549 ### ###
Pekerja ( OH ) 0.20 85,000 17,131 ### ###
Kepala Tukang ( 0.00 150,000 513 ### ###
Tukang Batu ( OH 0.03 100,000 3,359 ### ###
Semen ( kg ) 42.99 1,300 55,893 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Air ( Ltr ) 26.26 50 1,313 ### ###
Kerikil ( m3 ) 0.09 220,000 20,522 ### ###
Mandor ( Oh ) 0.01 185,000 1,876 ### ###
Pasir beton ( M3 0.06 250,000 15,944 ### ###
Q09
[ 21 kg / 1 hari ] Pekerjaan 22.64 92,250 258,334 ### ###
Pekerja ( OH ) 0.15 85,000 12,470 ### ###
Kepala Tukang ( 0.01 150,000 2,201 ### ###
Tukang Besi ( OH 0.15 100,000 14,670 ### ###
Besi beton ( kg ) 22.01 10,000 220,055 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kawat beton ( kg 0.31 23,500 7,388 ### ###
Mandor ( Oh ) 0.01 185,000 1,551 ### ###
Q10
[ 1,4 m2 / 1 hari ] Pekerjaan 5.49 619,075 510,779 ### ###
Pekerja ( OH ) 0.89 85,000 75,735 ### ###
Tukang Kayu ( OH 0.45 100,000 44,550 ### ###
Kepala Tukang ( 0.04 150,000 6,683 ### ###
Paku Biasa 2" - 5" 0.54 25,000 13,500 ### ###
Dolken kayu Ø 8- 2.70 25,000 67,500 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Minyak bekisting ( 0.27 45,750 12,353 ### ###
Plywood 120x240 0.47 175,000 82,688 ### ###
Balok Kayu 4x6-K.I 0.02 3,100,000 75,330 ### ###
Papan Kayu 2x20-K 0.05 2,300,000 124,200 ### ###
Mandor ( Oh ) 0.04 185,000 8,242 ### ###
Q11
[ 0,2 m3 / 1 hari ] Pekerjaan 76.99 123,919 128,818 ### ###
Pekerja ( OH ) 0.22 85,000 18,934 ### ###
Kepala Tukang ( 0.00 150,000 567 ### ###
Tukang Batu ( OH 0.04 100,000 3,713 ### ###
Semen ( kg ) 47.52 1,300 61,776 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Air ( Ltr ) 29.03 50 1,451 ### ###
Kerikil ( m3 ) 0.10 220,000 22,682 ### ###
Mandor ( Oh ) 0.01 185,000 2,073 ### ###
Pasir beton ( M3 0.07 250,000 17,622 ### ###
Q12
[ 16,9 m2 / 1 hari ] Pasangan 1348.27 110,993 1,839,193 ### ###
Pekerja ( OH ) 5.05 85,000 428,956 ### ###
Kepala Tukang ( 0.17 150,000 25,233 ### ###
Tukang Batu ( OH 1.68 100,000 168,218 ### ###
Semen ( kg ) 162.83 1,300 211,685 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pasir Pasang ( m3 0.76 255,000 193,030 ### ###
Bata merah ( bh ) 1177.53 650 765,391 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 0.25 185,000 46,680 ### ###
Q13

317/396
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
[ 24 m2 / 2 hari ] Pekerjaan P 136.56 129,383 1,413,461 ### ###
Pekerja ( OH ) 7.20 85,000 612,000 ### ###
Kepala Tukang ( 0.36 150,000 54,000 ### ###
Tukang Batu ( OH 3.60 100,000 360,000 ### ###
Semen ( kg ) 124.42 1,300 161,741 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pasir Pasang ( m3 0.62 255,000 159,120 ### ###
Mandor ( Oh ) 0.36 185,000 66,600 ### ###
Q14
[ 2,5 m2 / 1 hari ] Pekerjaan 8.93 104,260 86,438 ### ###
Pekerja ( OH ) 0.50 85,000 42,500 ### ###
Kepala Tukang ( 0.03 150,000 3,750 ### ###
Tukang Batu ( OH 0.25 100,000 25,000 ### ###
Semen ( kg ) 8.13 1,300 10,563 ### ###
Mandor ( Oh ) 0.03 185,000 4,625 ### ###
Q15
[ 2,5 m2 / 1 hari ] Pekerjaan 35.01 137,329 834,813 ### ###
Pekerja ( OH ) 1.75 85,000 148,750 ### ###
Kepala Tukang ( 0.09 150,000 13,125 ### ###
Tukang Batu ( OH 0.88 100,000 87,500 ### ###
Semen ( kg ) 29.38 1,300 38,188 ### ###
Pasir Pasang ( m3 0.09 255,000 22,313 ### ###
Batu alam / tempe 2.75 185,000 508,750 ### ###
Mandor ( Oh ) 0.09 185,000 16,188 ### ###
Q16
[ 24 m2 / 1 hari ] Pekerjaan 13.26 85,041 500,846 ### ###
Pekerja ( OH ) 0.48 85,000 40,800 ### ###
Kepala Tukang ( 0.15 150,000 22,680 ### ###
Cat Dasar Tembok 2.40 39,286 94,286 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Cat Tembok (Exter 6.24 24,000 149,760 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mandor ( Oh ) 0.07 185,000 13,320 ### ###
Plamir ( Kg ) 2.40 12,000 28,800 ### ###
Tukang cat ( OH ) 1.51 100,000 151,200 ### ###
Q17
[ 10 m2 / 1 hari ] Pekerjaan 16.88 159,286 2,203,125 ### ###
Pekerja ( OH ) 2.50 85,000 212,500 ### ###
Tukang Kayu ( OH 2.50 100,000 250,000 ### ###
Kepala Tukang ( 0.25 150,000 37,500 ### ###
Paving block 6 cm 10.10 135,000 1,363,500 ### ###
Alat Bantu Kerja P 1.00 210,000 210,000 ### ###
Mandor ( Oh ) 0.03 185,000 4,625 ### ###
Pasir beton ( M3 0.50 250,000 125,000 ### ###
Q18
[ 5 pohon / 1 hari ] Pekerja 7.80 211,667 2,801,750 ### ###
Pekerja ( OH ) 1.00 85,000 85,000 ### ###
Kepala Tukang ( 0.05 150,000 7,500 ### ###
Tukang Batu ( OH 1.50 100,000 150,000 ### ###
Pohon Perdu ( uni 5.00 500,000 2,500,000 ### ###
Perlengkapan Umu 0.20 250,000 50,000 ### ###
Mandor ( Oh ) 0.05 185,000 9,250 ### ###
R01
[ 1 Ls / 1 hari ] Pekerjaan 1.00 2,500,000 2,500,000 ### ###
Listrik PLN ( Ls ) 1.00 2,500,000 2,500,000 ### ###

318/396
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
R02
[ 1 Ls / 1 hari ] Pekerjaan 1.00 2,300,000 2,300,000 ### ###
Instalasi PDAM ( L 1.00 2,300,000 2,300,000 ### ###
R03
[ 1 unit / 1 hari ] Pekerjaan 2.02 284,000 957,700 ### ###
Pekerja ( OH ) 0.40 85,000 34,000 ### ###
Tukang Pipa ( Oh 0.20 100,000 20,000 ### ###
Pompa Air ( Unit 1.00 800,000 800,000 ### ###
Perlengkapan Umu 0.40 250,000 100,000 ### ###
Mandor ( Oh ) 0.02 185,000 3,700 ### ###
R04
[ 2 unit / 1 hari ] Pemasanga 2.18 184,000 624,380 ### ###
Pekerja ( OH ) 0.08 85,000 7,140 ### ###
Tukang Listrik ( O 0.04 100,000 4,000 ### ###
Exhaust Fan ( unit 2.00 300,000 600,000 ### ###
Perlengkapan Umu 0.05 250,000 12,500 ### ###
Mandor ( Oh ) 0.00 185,000 740 ### ###
R05
[ 1 unit / 1 hari ] Pemasangan 1.09 1,084,000 4,812,190 ### ###
Pekerja ( OH ) 0.04 85,000 3,570 ### ###
Tukang Listrik ( O 0.02 100,000 2,000 ### ###
Air Conditioner ( 1.00 4,800,000 4,800,000 ### ###
Perlengkapan Umu 0.03 250,000 6,250 ### ###
Mandor ( Oh ) 0.00 185,000 370 ### ###
R06
[ 150 m2 / 6 hari ] Pembersih 42.00 140,000 3,915,000 ### ###
Pekerja ( OH ) 37.50 85,000 3,187,500 ### ###
Kepala Tukang ( 3.00 150,000 450,000 ### ###
Mandor ( Oh ) 1.50 185,000 277,500 ### ###
A04
[ 1 Unit / 1 hari ] Pembuatan 145.54 924,526 8,147,696 ### ###
Pekerja ( OH ) 5.00 85,000 425,000 ### ###
Tukang Kayu ( OH 2.00 100,000 200,000 ### ###
Kepala Tukang ( 1.00 150,000 150,000 ### ###
Paku Biasa 2" - 5" 7.29 25,000 182,325 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pasir Urug ( m3 ) 0.09 200,000 18,000 ### ###
Screw ( bh ) 69.99 500 34,993 ### ###
Tripleks ( Lbr ) 31.68 85,000 2,692,800 ### ###
Kerikil ( m3 ) 0.15 220,000 33,000 ### ###
Engsel Pintu ( bh 3.00 17,000 51,000 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Jendela nako (ran 1.00 55,000 55,000 ### ###
Balok Kayu 5x10-K 0.32 3,500,000 1,108,800 ### ###
Balok Kayu 4x6-K.I 0.04 3,100,000 109,048 ### ###
Balok Kayu 3x4-K.I 0.10 2,800,000 266,112 ### ###
Balok Kayu 2x3-K.I 0.03 2,200,000 69,724 ### ###
Papan Kayu 2x20-K 0.20 4,500,000 891,000 ### ###
Perlengkapan Umu 1.00 250,000 250,000 ### ###
Mandor ( Oh ) 1.00 185,000 185,000 ### ###
Paku Biasa ½" - 1" 1.94 23,500 45,703 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Seng Gelombang 3" 19.72 70,000 1,380,192 ### ###
(empty)
(empty)

319/396
(empty)

Total Result
(empty)
(empty)
(empty)
Data

92608.54
255,489
722,863,124
###
###

7-Apr-20

8-Apr-20

9-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
320/396
DAFTAR ANALISA HARGA SATUAN PEKERJAAN (AHSP)
A002/T100.80/I-2020-Pembangunan Rumah Tinggal 2 Lantai Type 200
Jl. Ebony Raya No. 77, Komp. Villa Danau Matano, Kab. Luwu Timur

Data
ID AHS Nama AHSP Nama Item Average - Koef Average - Harga D Average - Average - Harga AHSP
U-001
[ m2 ] Pembersihan lapangan dan perataan
Pekerja ( OH ) 0.10 85,000 8,500 17,750
Mandor ( Oh ) 0.05 185,000 9,250

U-002
[ m1 ] Pengukuran dan pemasangan Bouwplank
Pekerja ( OH ) 0.10 85,000 8,500 90,125
Tukang Kayu ( O 0.10 100,000 10,000
Kepala Tukang ( 0.01 150,000 1,500
Paku Biasa 2" - 5" 0.02 25,000 500
Balok Kayu 4x6-K. 0.01 3,100,000 37,200
Papan Kayu 2x20- 0.01 4,500,000 31,500
Mandor ( Oh ) 0.01 185,000 925

U-003
[ Unit ] Pembuatan Gudang Bahan Ukuran 3 m x3m tinggi 2.4 m
Pekerja ( OH ) 5.00 85,000 425,000 8,092,696
Tukang Kayu ( O 2.00 100,000 200,000
Kepala Tukang ( 1.00 150,000 150,000
Paku Biasa 2" - 5" 7.29 25,000 182,325
Pasir Urug ( m3 ) 0.09 200,000 18,000
Screw ( bh ) 69.99 500 34,993
Tripleks ( Lbr ) 31.68 85,000 2,692,800
Kerikil ( m3 ) 0.15 220,000 33,000
Engsel Pintu ( bh 3.00 17,000 51,000
Balok Kayu 5x10-K 0.32 3,500,000 1,108,800
Balok Kayu 4x6-K. 0.04 3,100,000 109,048
Balok Kayu 3x4-K. 0.10 2,800,000 266,112
Balok Kayu 2x3-K. 0.03 2,200,000 69,724
Papan Kayu 2x20- 0.20 4,500,000 891,000
Perlengkapan Um 1.00 250,000 250,000
Mandor ( Oh ) 1.00 185,000 185,000
Paku Biasa ½" - 1 1.94 23,500 45,703
Seng Gelombang 3 19.72 70,000 1,380,192

U-004
[ Unit ] Pembuatan Kantor Sementara/Bedeng Pekerja/Direksi Keet, 3x3-tinggi 2.4 m
Pekerja ( OH ) 5.00 85,000 425,000 8,147,696
Tukang Kayu ( O 2.00 100,000 200,000
Kepala Tukang ( 1.00 150,000 150,000
Paku Biasa 2" - 5" 7.29 25,000 182,325
Pasir Urug ( m3 ) 0.09 200,000 18,000
Screw ( bh ) 69.99 500 34,993
Tripleks ( Lbr ) 31.68 85,000 2,692,800
Kerikil ( m3 ) 0.15 220,000 33,000
Engsel Pintu ( bh 3.00 17,000 51,000
Jendela nako (ra 1.00 55,000 55,000
Balok Kayu 5x10-K 0.32 3,500,000 1,108,800
Balok Kayu 4x6-K. 0.04 3,100,000 109,048
Balok Kayu 3x4-K. 0.10 2,800,000 266,112
Balok Kayu 2x3-K. 0.03 2,200,000 69,724
Papan Kayu 2x20- 0.20 4,500,000 891,000
Perlengkapan Um 1.00 250,000 250,000
Mandor ( Oh ) 1.00 185,000 185,000
Paku Biasa ½" - 1 1.94 23,500 45,703
Seng Gelombang 3 19.72 70,000 1,380,192

U-007
[ m3 ] Penggalian tanah biasa sedalam 2 m
Pekerja ( OH ) 0.90 85,000 76,500 84,825
Mandor ( Oh ) 0.05 185,000 8,325

U-008
[ m3 ] Pengurugan dengan pasir urug
Pekerja ( OH ) 0.30 85,000 25,500 267,350
Pasir Urug ( m3 ) 1.20 200,000 240,000
Mandor ( Oh ) 0.01 185,000 1,850

U-033
[ kg ] Pembesian dengan besi polos atau besi ulir
Pekerja ( OH ) 0.01 85,000 595 12,327
Tukang Besi ( OH 0.01 100,000 700
Kepala Tukang ( 0.00 150,000 105
Besi beton ( kg ) 1.05 10,000 10,500
Kawat beton ( kg 0.02 23,500 353

321/396
Data
Mandor ( Oh ) 0.00 185,000 74

U-027
[ m3 ] Membuat beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58
Pekerja ( OH ) 1.65 85,000 140,250 975,620
Tukang Batu ( OH 0.28 100,000 27,500
Kepala Tukang ( 0.03 150,000 4,200
Air ( Ltr ) 215.00 50 10,750
Semen ( kg ) 371.00 1,300 482,300
Kerikil ( m3 ) 0.78 220,000 170,622
Mandor ( Oh ) 0.08 185,000 15,355
Pasir beton ( M3 0.50 250,000 124,643

U-011
[ m3 ] Pemasangan batu kosong (anstamping)
Pekerja ( OH ) 0.78 85,000 66,300 504,765
Tukang Batu ( OH 0.39 100,000 39,000
Kepala Tukang ( 0.04 150,000 5,850
Batu belah ( m3 1.20 250,000 300,000
Pasir Urug ( m3 ) 0.43 200,000 86,400
Mandor ( Oh ) 0.04 185,000 7,215

U-012
[ m3 ] Pemasangan pondasi batu belah campuran 1SP : 3PP
Pekerja ( OH ) 1.50 85,000 127,500 913,900
Tukang Batu ( OH 0.75 100,000 75,000
Kepala Tukang ( 0.08 150,000 11,250
Batu belah ( m3 1.20 250,000 300,000
Pasir Pasang ( m 0.49 255,000 123,675
Semen ( kg ) 202.00 1,300 262,600
Mandor ( Oh ) 0.08 185,000 13,875

U-014
[ m1 ] Memasang rollag bata , campuran spesi 1 PC : 3 PP
Pekerja ( OH ) 0.09 85,000 7,650 32,901
Tukang Batu ( OH 0.03 100,000 3,000
Kepala Tukang ( 0.00 150,000 450
Bata merah ( bh 17.00 650 11,050
Pasir Pasang ( m 0.01 255,000 3,494
Semen ( kg ) 4.94 1,300 6,425
Mandor ( Oh ) 0.00 185,000 833

U-009
[ m3 ] Urug tanah mendatangkan
Pekerja ( OH ) 0.30 85,000 25,500 219,350
Tanah urug ( m3 1.20 160,000 192,000
Mandor ( Oh ) 0.01 185,000 1,850

U-010
[ m3 ] Pemadatan tanah tanah ( per 20 cm)
Pekerja ( OH ) 0.50 85,000 42,500 51,750
Mandor ( Oh ) 0.05 185,000 9,250

U-016
[ m2 ] Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 5 PP
Pekerja ( OH ) 0.30 85,000 25,500 109,334
Tukang Batu ( OH 0.10 100,000 10,000
Kepala Tukang ( 0.01 150,000 1,500
Bata merah ( bh 70.00 650 45,500
Pasir Pasang ( m 0.05 255,000 11,475
Semen ( kg ) 9.68 1,300 12,584
Mandor ( Oh ) 0.02 185,000 2,775

U-015
[ m2 ] Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
Pekerja ( OH ) 0.30 85,000 25,500 114,156
Tukang Batu ( OH 0.10 100,000 10,000
Kepala Tukang ( 0.01 150,000 1,500
Bata merah ( bh 70.00 650 45,500
Pasir Pasang ( m 0.04 255,000 10,200
Semen ( kg ) 14.37 1,300 18,681
Mandor ( Oh ) 0.02 185,000 2,775

U-019
[ m2 ] Pemasangan plesteran 1SP : 5PP tebal 15 mm
Pekerja ( OH ) 0.30 85,000 25,500 58,894
Tukang Batu ( OH 0.15 100,000 15,000
Kepala Tukang ( 0.02 150,000 2,250
Pasir Pasang ( m 0.03 255,000 6,630

322/396
Data
Semen ( kg ) 5.18 1,300 6,739
Mandor ( Oh ) 0.02 185,000 2,775

U-020
[ m2 ] Pemasangan acian.
Pekerja ( OH ) 0.20 85,000 17,000 34,575
Tukang Batu ( OH 0.10 100,000 10,000
Kepala Tukang ( 0.01 150,000 1,500
Semen ( kg ) 3.25 1,300 4,225
Mandor ( Oh ) 0.01 185,000 1,850

U-080
[ m2 ] Pemasangan genteng metal ukuran 80 x 100 atap pelana
Pekerja ( OH ) 0.20 85,000 17,000 178,985
Tukang Kayu ( O 0.10 100,000 10,000
Kepala Tukang ( 0.01 150,000 1,500
Atap Genteng Met 1.30 112,000 145,600
Mandor ( Oh ) 0.00 185,000 185
Paku Biasa ½" - 1 0.20 23,500 4,700

U-082
[ m1 ] Pemasangan nok genteng metal
Pekerja ( OH ) 0.25 85,000 21,250 133,455
Tukang Kayu ( O 0.15 100,000 15,000
Kepala Tukang ( 0.02 150,000 2,250
nok genteng meta 1.10 83,000 91,300
Paku Biasa 2" - 5" 0.05 25,000 1,250
Mandor ( Oh ) 0.01 185,000 2,405

U-083
[ m1 ] Pemasangan lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
Pekerja ( OH ) 0.10 85,000 8,500 128,885
Tukang Kayu ( O 0.20 100,000 20,000
Kepala Tukang ( 0.02 150,000 3,000
Paku Biasa 2" - 5" 0.10 25,000 2,500
Papan Kayu 2x20- 0.01 8,700,000 93,960
Mandor ( Oh ) 0.01 185,000 925

U-085
[ m1 ] Pemasangan talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
Pekerja ( OH ) 0.15 85,000 12,750 97,230
Tukang Atap ( OH 0.30 100,000 30,000
Kepala Tukang ( 0.03 150,000 4,500
Baja strip (0,2 x 0.50 12,500 6,250
Paku Biasa 2" - 5" 0.01 25,000 250
Mandor ( Oh ) 0.01 185,000 1,480
Seng Gelombang 3 0.60 70,000 42,000

U-120
[ m2 ] Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Pekerja ( OH ) 0.07 85,000 5,950 42,685
Kepala Tukang ( 0.01 150,000 900
Amplas ( Lbr ) 0.20 3,500 700
Cat kayu ( Kg ) 0.26 60,000 15,600
Cat meni ( Kg ) 0.20 16,300 3,260
Kuas ( Bh ) 0.01 17,000 170
Cat Dasar Kayu/Be 0.17 65,000 11,050
Tinner ( Ltr ) 0.03 60,000 1,800
Mandor ( Oh ) 0.00 185,000 555
Plamir ( Kg ) 0.15 12,000 1,800
Tukang cat ( OH 0.01 100,000 900

U-121
[ unit ] Pekerjaan Pasangan Pintu utama type P1
Pekerja ( OH ) 0.50 85,000 42,500 2,341,000
Tukang Kayu ( O 0.80 100,000 80,000
Pintu Utama (Kus 1.00 2,100,000 2,100,000
Perlengkapan Um 0.40 250,000 100,000
Mandor ( Oh ) 0.10 185,000 18,500

U-122
[ unit ] Pekerjaan Pasangan Pintu Ruangan type P2
Pekerja ( OH ) 0.50 85,000 42,500 1,841,000
Tukang Kayu ( O 0.80 100,000 80,000
Pintu Utama (Kus 1.00 1,600,000 1,600,000
Perlengkapan Um 0.40 250,000 100,000
Mandor ( Oh ) 0.10 185,000 18,500

U-123

323/396
Data
[ unit ] Pekerjaan Pasangan Pintu WC type P3
Pekerja ( OH ) 0.50 85,000 42,500 1,341,000
Tukang Kayu ( O 0.80 100,000 80,000
Pintu Utama (Kus 1.00 1,100,000 1,100,000
Perlengkapan Um 0.40 250,000 100,000
Mandor ( Oh ) 0.10 185,000 18,500

U-124
[ unit ] Pekerjaan Pasangan Jendela type J1
Pekerja ( OH ) 0.30 85,000 25,500 1,124,750
Tukang Kayu ( O 0.60 100,000 60,000
Jendela Type J1 ( 1.00 980,000 980,000
Perlengkapan Um 0.20 250,000 50,000
Mandor ( Oh ) 0.05 185,000 9,250

U-087
[ m1 ] Pemasangan pipa PVC tipe AW diameter 3/4”
Pekerja ( OH ) 0.04 85,000 3,060 23,930
Tukang Batu ( OH 0.06 100,000 6,000
Kepala Tukang ( 0.01 150,000 900
Pipa PVC 3/4" ( 1.20 5,500 6,600
Perlengkapan Um 0.35 20,000 7,000
Mandor ( Oh ) 0.00 185,000 370

U-086
[ m1 ] Pemasangan pipa PVC tipe AW diameter 1/2”
Pekerja ( OH ) 0.04 85,000 3,060 22,130
Tukang Batu ( OH 0.06 100,000 6,000
Kepala Tukang ( 0.01 150,000 900
Pipa PVC 1/2" ( 1.20 4,000 4,800
Perlengkapan Um 0.35 20,000 7,000
Mandor ( Oh ) 0.00 185,000 370

U-091
[ bh ] Pemasangan kran diameter ½” atau 3/4”
Pekerja ( OH ) 0.01 85,000 850 72,888
Tukang Batu ( OH 0.40 100,000 40,000
Kepala Tukang ( 0.04 150,000 6,000
Kran air ( M ) 1.00 25,000 25,000
Sealtape ( bh ) 0.03 4,500 113
Mandor ( Oh ) 0.01 185,000 925

U-099
[ Unit ] Pek. Pembuatan Sumur Resapan dengan Buis 80 cm, Kedalaman 1,5 m
Pekerja ( OH ) 3.10 85,000 263,602 1,471,503
Tukang Batu ( OH 3.02 100,000 301,749
Kepala Tukang ( 0.00 150,000 267
Air ( Ltr ) 13.67 50 684
Kawat beton ( kg 1.22 23,500 28,576
Pasir Pasang ( m 0.03 255,000 8,706
Semen ( kg ) 23.59 1,300 30,667
Kerikil ( m3 ) 0.05 220,000 10,462
Pipa PVC 3" ( m1 3.00 8,000 24,000
T Bow 3" ( bh ) 2.00 35,000 70,000
Pelat 1/8" ( m2 ) 0.64 265,000 168,500
Baut M10 ( bh ) 3.00 5,000 15,000
Buis beton D. 80 3.00 62,000 186,000
Besi Ø8 (Polos) ( 15.20 4,091 62,182
Perlengkapan Um 1.00 250,000 250,000
Mandor ( Oh ) 0.28 185,000 51,110

U-100
[ unit ] Pekerjaan Pasangan Shower Mandi
Pekerja ( OH ) 0.20 85,000 17,000 516,625
Tukang Pipa ( Oh 0.10 100,000 10,000
Shower Mandi ( U 1.00 460,000 460,000
Perlengkapan Um 0.10 250,000 25,000
Mandor ( Oh ) 0.03 185,000 4,625

U-089
[ m1 ] Pemasangan pipa PVC tipe AW diameter 3”
Pekerja ( OH ) 0.08 85,000 6,885 39,750
Tukang Batu ( OH 0.14 100,000 13,500
Kepala Tukang ( 0.01 150,000 2,025
Pipa PVC 3" ( m1 1.20 8,000 9,600
Perlengkapan Um 0.35 20,000 7,000
Mandor ( Oh ) 0.00 185,000 740

U-090
[ m1 ] Pemasangan pipa PVC tipe AW diameter 4”

324/396
Data
Pekerja ( OH ) 0.08 85,000 6,885 40,950
Tukang Batu ( OH 0.14 100,000 13,500
Kepala Tukang ( 0.01 150,000 2,025
Pipa PVC 4" ( m1 1.20 9,000 10,800
Perlengkapan Um 0.35 20,000 7,000
Mandor ( Oh ) 0.00 185,000 740

U-092
[ bh ] Pemasangan closet duduk
Pekerja ( OH ) 3.30 85,000 280,500 2,936,600
Tukang Batu ( OH 1.10 100,000 110,000
Kepala Tukang ( 0.01 150,000 1,500
Kloset Duduk ( Un 1.00 2,500,000 2,500,000
Perlengkapan Um 0.06 250,000 15,000
Mandor ( Oh ) 0.16 185,000 29,600

U-093
[ bh ] Pemasangan closet jongkok
Pekerja ( OH ) 1.00 85,000 85,000 547,450
Tukang Batu ( OH 1.50 100,000 150,000
Kepala Tukang ( 0.15 150,000 22,500
Pasir Pasang ( m 0.01 255,000 2,550
Semen ( kg ) 6.00 1,300 7,800
Kloset Jongkok ( 1.00 250,000 250,000
Mandor ( Oh ) 0.16 185,000 29,600

U-094
[ bh ] Pemasangan wastafel
Pekerja ( OH ) 1.20 85,000 102,000 1,370,950
Tukang Batu ( OH 1.45 100,000 145,000
Kepala Tukang ( 0.15 150,000 22,500
Pasir Pasang ( m 0.01 255,000 2,550
Semen ( kg ) 6.00 1,300 7,800
Wastafel ( Unit ) 1.00 1,050,000 1,050,000
Perlengkapan Um 0.12 250,000 30,000
Mandor ( Oh ) 0.06 185,000 11,100

U-096
[ bh ] Pemasangan floor drain
Pekerja ( OH ) 0.01 85,000 850 73,275
Tukang Batu ( OH 0.10 100,000 10,000
Kepala Tukang ( 0.01 150,000 1,500
Floor drain ( Unit 1.00 60,000 60,000
Mandor ( Oh ) 0.01 185,000 925

U-098
[ unit ] Septik Tank Double Kompartmen, 1.6x0.8x1.3 ,1.66m3 (10org/3thn)
Pekerja ( OH ) 9.33 85,000 792,744 3,040,999
Tukang Batu ( OH 3.29 100,000 329,120
Kepala Tukang ( 0.33 150,000 49,378
Bata merah ( bh 599.20 650 389,480
Kawat beton ( kg 1.92 23,500 45,120
Pasir Pasang ( m 0.63 255,000 161,141
Semen ( kg ) 276.34 1,300 359,248
Kerikil ( m3 ) 0.10 220,000 21,060
Pipa PVC 4" ( m1 3.00 9,000 27,000
Pipa PVC 3" ( m1 4.00 8,000 32,000
Pipa PVC 1” ( m1 1.00 6,000 6,000
T Bow 4" ( bh ) 1.00 65,000 65,000
T Bow 3" ( bh ) 1.00 35,000 35,000
Dop 3" ( bh ) 1.00 35,000 35,000
Pelat 1/8" ( m2 ) 0.16 265,000 42,400
Baut M10 ( bh ) 3.00 5,000 15,000
Besi Ø8 (Polos) ( 23.36 4,091 95,564
Perlengkapan Um 1.80 250,000 450,000
Mandor ( Oh ) 0.49 185,000 90,745

U-102
[ Unit ] Pekerjaan Pasangan Box MCB
Pekerja ( OH ) 0.40 85,000 34,000 507,700
Tukang Listrik ( 0.20 100,000 20,000
MCB + Box ( Unit 1.00 350,000 350,000
Perlengkapan Um 0.40 250,000 100,000
Mandor ( Oh ) 0.02 185,000 3,700

U-103
[ btg ] Pekerjaan Pasangan Pembumian (Grounding)
Pekerja ( OH ) 0.40 85,000 34,000 807,700
Tukang Listrik ( 0.20 100,000 20,000
Perlengkapan Um 0.40 250,000 100,000
Grounding Rod ( 1.00 650,000 650,000

325/396
Data
Mandor ( Oh ) 0.02 185,000 3,700

U-104
[ m1 ] Pekerjaan Instalasi Kabel NYM-3x2.5m2
Pekerja ( OH ) 0.02 85,000 1,700 18,260
Tukang Listrik ( 0.01 100,000 1,000
Kabel NYM 3x2,5 1.10 10,400 11,440
Perlengkapan Um 0.02 250,000 3,750
Mandor ( Oh ) 0.00 185,000 370

U-105
[ m1 ] Pekerjaan Instalasi Kabel NYM 2x1,5 mm2
Pekerja ( OH ) 0.02 85,000 1,700 11,730
Tukang Listrik ( 0.01 100,000 1,000
Kabel NYM 2x1,5 1.10 5,600 6,160
Perlengkapan Um 0.01 250,000 2,500
Mandor ( Oh ) 0.00 185,000 370

U-107
[ Unit ] Pekerjaan Pasangan Fitting Lampu
Pekerja ( OH ) 0.04 85,000 3,400 35,770
Tukang Listrik ( 0.02 100,000 2,000
Fitting Lampu ( u 1.00 25,000 25,000
Perlengkapan Um 0.02 250,000 5,000
Mandor ( Oh ) 0.00 185,000 370

U-108
[ unit ] Pekerjaan Pasangan Saklar Lampu
Pekerja ( OH ) 0.04 85,000 3,400 36,770
Tukang Listrik ( 0.02 100,000 2,000
Saklar Listrik ( un 1.00 25,000 25,000
Perlengkapan Um 0.02 250,000 6,000
Mandor ( Oh ) 0.00 185,000 370

U-106
[ unit ] Pekerjaan Pasangan Colokan Listrik (Receiptackle)
Pekerja ( OH ) 0.04 85,000 3,570 42,190
Tukang Listrik ( 0.02 100,000 2,000
Receiptackle ( un 1.00 30,000 30,000
Perlengkapan Um 0.03 250,000 6,250
Mandor ( Oh ) 0.00 185,000 370

U-109
[ unit ] Pekerjaan Pasangan Lampu 5 W
Pekerja ( OH ) 0.04 85,000 3,400 31,085
Tukang Listrik ( 0.01 100,000 1,000
Lampu 5W ( unit 1.00 24,000 24,000
Perlengkapan Um 0.01 250,000 2,500
Mandor ( Oh ) 0.00 185,000 185

U-110
[ unit ] Pekerjaan Pasangan Lampu 15 W
Pekerja ( OH ) 0.04 85,000 3,400 46,085
Tukang Listrik ( 0.01 100,000 1,000
Lampu 15W ( uni 1.00 39,000 39,000
Perlengkapan Um 0.01 250,000 2,500
Mandor ( Oh ) 0.00 185,000 185

U-111
[ unit ] Pekerjaan Pasangan Lampu 20 W
Pekerja ( OH ) 0.04 85,000 3,400 52,085
Tukang Listrik ( 0.01 100,000 1,000
Lampu 20W ( uni 1.00 45,000 45,000
Perlengkapan Um 0.01 250,000 2,500
Mandor ( Oh ) 0.00 185,000 185

U-045
[ m2 ] Pemasangan lantai ubin teralux marmer ukuran 60cm x60cm
Pekerja ( OH ) 0.24 85,000 20,400 292,875
Tukang Batu ( OH 0.12 100,000 12,000
Kepala Tukang ( 0.01 150,000 1,800
Pasir Pasang ( m 0.05 255,000 11,475
Semen ( kg ) 9.60 1,300 12,480
Semen Warna ( K 1.50 15,000 22,500
Keramik Lantai 6 1.05 200,000 210,000
Mandor ( Oh ) 0.01 185,000 2,220

U-044

326/396
Data
[ m2 ] Pemasangan lantai ubin teralux marmer ukuran 40cm x40cm
Pekerja ( OH ) 0.25 85,000 21,250 192,070
Tukang Batu ( OH 0.13 100,000 12,500
Kepala Tukang ( 0.01 150,000 1,950
Pasir Pasang ( m 0.05 255,000 11,475
Semen ( kg ) 9.80 1,300 12,740
Semen Warna ( K 1.30 15,000 19,500
Keramik Lantai 4 1.05 105,000 110,250
Mandor ( Oh ) 0.01 185,000 2,405

U-043
[ m2 ] Pemasangan lantai keramik ukuran 30cm x 30cm
Pekerja ( OH ) 0.70 85,000 59,500 252,950
Tukang Batu ( OH 0.35 100,000 35,000
Kepala Tukang ( 0.04 150,000 5,250
Pasir Pasang ( m 0.05 255,000 11,475
Semen ( kg ) 10.00 1,300 13,000
Semen Warna ( K 1.50 15,000 22,500
Keramik Lantai 3 1.05 95,000 99,750
Mandor ( Oh ) 0.04 185,000 6,475

U-047
[ m2 ] Pemasangan dinding keramik 20cm x 40cm
Pekerja ( OH ) 0.90 85,000 76,500 278,255
Tukang Batu ( OH 0.45 100,000 45,000
Kepala Tukang ( 0.05 150,000 6,750
Pasir Pasang ( m 0.02 255,000 4,590
Semen ( kg ) 9.30 1,300 12,090
Semen Warna ( K 2.10 15,000 31,500
Keramik Dinding 1.10 85,000 93,500
Mandor ( Oh ) 0.05 185,000 8,325

U-054
[ m1 ] Pemasangan Plint Keramik 10cm x 60cm
Pekerja ( OH ) 0.09 85,000 7,650 43,072
Tukang Batu ( OH 0.09 100,000 9,000
Kepala Tukang ( 0.01 150,000 1,350
Pasir Pasang ( m 0.00 255,000 765
Semen ( kg ) 1.14 1,300 1,482
Semen Warna ( K 0.10 15,000 1,500
Plint Keramik 10 1.70 12,000 20,400
Mandor ( Oh ) 0.01 185,000 925

U-072
[ m2 ] Pek. rangka Plafon Hollow Galvanish, modul 60 x 120 cm
Pekerja ( OH ) 0.35 85,000 29,750 132,580
Tukang Besi ( OH 0.35 100,000 35,000
Kepala Tukang ( 0.04 150,000 5,250
Screw ( bh ) 18.00 500 9,000
Perlengkapan Um 0.02 250,000 5,000
Hollow 4/4 Galva 3.50 7,000 24,500
Hollow 2/4 Galva 1.75 5,000 8,750
Suspension Rod ( 2.00 6,000 12,000
Mandor ( Oh ) 0.02 185,000 3,330

U-073
[ m2 ] Pemasangan langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm
Pekerja ( OH ) 0.10 85,000 8,500 46,926
Tukang Kayu ( O 0.05 100,000 5,000
Kepala Tukang ( 0.01 150,000 750
Gypsum board 9 0.36 87,000 31,668
Paku sekrup ( kg 0.11 750 83
Mandor ( Oh ) 0.01 185,000 925

U-075
[ m1 ] Pemasangan list langit-langit kayu profil
Pekerja ( OH ) 0.05 85,000 4,250 13,819
Tukang Kayu ( O 0.05 100,000 5,000
Kepala Tukang ( 0.01 150,000 750
Paku Biasa 2" - 5" 0.01 25,000 250
List kayu profil ( 1.05 2,870 3,014
Mandor ( Oh ) 0.00 185,000 555

U-114
[ m2 ] Pekerjaan Pekerjaan Plamir (1 Lapis)
Pekerja ( OH ) 0.02 85,000 1,700 15,000
Kepala Tukang ( 0.01 150,000 1,500
Amplas ( Lbr ) 0.50 3,500 1,750
Mandor ( Oh ) 0.01 185,000 1,850
Plamir ( Kg ) 0.10 12,000 1,200
Tukang cat ( OH 0.07 100,000 7,000

327/396
Data

U-115
[ m2 ] Pekerjaan Cat Anti Lumut dan Waterproofing
Pekerja ( OH ) 0.02 85,000 1,700 19,050
Kepala Tukang ( 0.01 150,000 1,500
Amplas ( Lbr ) 0.50 3,500 1,750
Rol Cat ( ea ) 0.01 25,000 250
Cat Waterproofin 0.10 50,000 5,000
Mandor ( Oh ) 0.01 185,000 1,850
Tukang cat ( OH 0.07 100,000 7,000

U-117
[ m2 ] Pengecatan tembok baru Exterior ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Pekerja ( OH ) 0.02 85,000 1,700 20,869
Kepala Tukang ( 0.01 150,000 945
Cat Dasar Tembok 0.10 39,286 3,929
Cat Tembok (Exter 0.26 24,000 6,240
Mandor ( Oh ) 0.00 185,000 555
Plamir ( Kg ) 0.10 12,000 1,200
Tukang cat ( OH 0.06 100,000 6,300

U-116
[ m2 ] Pengecatan tembok baru Interior ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Pekerja ( OH ) 0.02 85,000 1,700 18,519
Kepala Tukang ( 0.01 150,000 945
Cat Dasar Tembok 0.10 26,190 2,619
Cat Tembok (Inter 0.26 20,000 5,200
Mandor ( Oh ) 0.00 185,000 555
Plamir ( Kg ) 0.10 12,000 1,200
Tukang cat ( OH 0.06 100,000 6,300

U-118
[ m2 ] Pengecatan Langit (langit-langit)
Pekerja ( OH ) 0.02 85,000 1,700 19,150
Kepala Tukang ( 0.01 150,000 945
Cat Plafon ( Kg ) 0.26 32,500 8,450
Mandor ( Oh ) 0.00 185,000 555
Plamir ( Kg ) 0.10 12,000 1,200
Tukang cat ( OH 0.06 100,000 6,300

U-119
[ m2 ] Pengecatan permukaan baja/besi
Pekerja ( OH ) 0.02 85,000 1,700 30,133
Kepala Tukang ( 0.02 150,000 3,000
Kuas ( Bh ) 0.01 17,000 170
Cat Besi ( Kg ) 0.10 48,000 4,800
Mandor ( Oh ) 0.00 185,000 463
Tukang cat ( OH 0.20 100,000 20,000

U-026
[ m3 ] Membuat beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61
Pekerja ( OH ) 1.65 85,000 140,250 954,206
Tukang Batu ( OH 0.28 100,000 27,500
Kepala Tukang ( 0.03 150,000 4,200
Air ( Ltr ) 215.00 50 10,750
Semen ( kg ) 352.00 1,300 457,600
Kerikil ( m3 ) 0.76 220,000 168,015
Mandor ( Oh ) 0.08 185,000 15,355
Pasir beton ( M3 0.52 250,000 130,536

U-055
[ m1 ] Pemasangan Corner Rope Tile (Kuku Keramik)
Pekerja ( OH ) 0.08 85,000 6,800 32,935
Tukang Batu ( OH 0.08 100,000 8,000
Kepala Tukang ( 0.01 150,000 1,200
Pasir Pasang ( m 0.00 255,000 765
Semen ( kg ) 1.10 1,300 1,430
Semen Warna ( K 0.10 15,000 1,500
Ballnose Rope Til 5.00 2,500 12,500
Mandor ( Oh ) 0.00 185,000 740

U-112
[ Ls ] Penyambungan Instalasi Listrik PLN
Listrik PLN ( Ls ) 1.00 2,500,000 2,500,000

U-144
[ m1 ] Pek.Pembuatan Railing Stainless Steel, tinggi 1,2 m
Pekerja ( OH ) 0.20 85,000 17,000 643,933
Tukang Besi ( OH 0.35 100,000 35,000

328/396
Data
Kepala Tukang ( 0.01 150,000 1,500
Perlengkapan Um 0.01 250,000 2,500
Hollow SS 40x40 2.64 83,333 220,000
Hollow SS 20x40 4.00 58,333 233,333
Pipa SS Dia.2" ( 1.10 82,500 90,750
Kawat las listrik ( 0.20 135,000 27,000
Sewa alat las ( j 0.10 150,000 15,000
Mandor ( Oh ) 0.01 185,000 1,850

U-006
[ m3 ] Penggalian tanah biasa sedalam 1 m
Pekerja ( OH ) 0.75 85,000 63,750 68,375
Mandor ( Oh ) 0.03 185,000 4,625

U-013
[ m3 ] Pemasangan pondasi batu belah campuran 1SP : 5PP
Pekerja ( OH ) 1.50 85,000 127,500 843,145
Tukang Batu ( OH 0.75 100,000 75,000
Kepala Tukang ( 0.08 150,000 11,250
Batu belah ( m3 1.20 250,000 300,000
Pasir Pasang ( m 0.54 255,000 138,720
Semen ( kg ) 136.00 1,300 176,800
Mandor ( Oh ) 0.08 185,000 13,875

U-056
[ m2 ] Pemasangan paving block natural tebal 6 cm
Pekerja ( OH ) 0.25 85,000 21,250 220,313
Tukang Kayu ( O 0.25 100,000 25,000
Kepala Tukang ( 0.03 150,000 3,750
Paving block 6 c 1.01 135,000 136,350
Alat Bantu Kerja 0.10 210,000 21,000
Mandor ( Oh ) 0.00 185,000 463
Pasir beton ( M3 0.05 250,000 12,500

U-142
[ pohon ] Pekerjaan Menanam Pohon Perdu
Pekerja ( OH ) 0.20 85,000 17,000 560,350
Tukang Batu ( OH 0.30 100,000 30,000
Kepala Tukang ( 0.01 150,000 1,500
Pohon Perdu ( un 1.00 500,000 500,000
Perlengkapan Um 0.04 250,000 10,000
Mandor ( Oh ) 0.01 185,000 1,850

U-113
[ Ls ] Penyambungan Instalasi Air PDAM
Instalasi PDAM ( 1.00 2,300,000 2,300,000

U-138
[ unit ] Pekerjaan Pasangan Pompa Air
Pekerja ( OH ) 0.40 85,000 34,000 957,700
Tukang Pipa ( Oh 0.20 100,000 20,000
Pompa Air ( Unit 1.00 800,000 800,000
Perlengkapan Um 0.40 250,000 100,000
Mandor ( Oh ) 0.02 185,000 3,700

U-140
[ unit ] Pekerjaan Pasangan Exhaust Fan
Pekerja ( OH ) 0.04 85,000 3,570 312,190
Tukang Listrik ( 0.02 100,000 2,000
Exhaust Fan ( uni 1.00 300,000 300,000
Perlengkapan Um 0.03 250,000 6,250
Mandor ( Oh ) 0.00 185,000 370

U-139
[ unit ] Pekerjaan Pasangan Air Conditioner
Pekerja ( OH ) 0.04 85,000 3,570 4,812,190
Tukang Listrik ( 0.02 100,000 2,000
Air Conditioner ( 1.00 4,800,000 4,800,000
Perlengkapan Um 0.03 250,000 6,250
Mandor ( Oh ) 0.00 185,000 370

U-141
[ m2 ] Pembersihan Area Kerja Pasca Konstruksi
Pekerja ( OH ) 0.25 85,000 21,250 26,100
Kepala Tukang ( 0.02 150,000 3,000
Mandor ( Oh ) 0.01 185,000 1,850

U-034

329/396
Data
[ m2 ] (K3) Pemasangan bekisting untuk pondasi
Pekerja ( OH ) 0.52 85,000 44,200 182,985
Tukang Kayu ( O 0.26 100,000 26,000
Kepala Tukang ( 0.03 150,000 3,900
Minyak bekisting 0.10 45,750 4,575
Paku Biasa 2" - 5" 0.30 25,000 7,500
Papan Kayu 2x20- 0.04 2,300,000 92,000
Mandor ( Oh ) 0.03 185,000 4,810

U-035
[ m2 ] (K3) Pemasangan bekisting untuk sloof
Pekerja ( OH ) 0.52 85,000 44,200 194,485
Tukang Kayu ( O 0.26 100,000 26,000
Kepala Tukang ( 0.03 150,000 3,900
Minyak bekisting 0.10 45,750 4,575
Paku Biasa 2" - 5" 0.30 25,000 7,500
Papan Kayu 2x20- 0.05 2,300,000 103,500
Mandor ( Oh ) 0.03 185,000 4,810

U-036
[ m2 ] (K3) Pemasangan bekisting untuk kolom
Pekerja ( OH ) 0.66 85,000 56,100 369,055
Tukang Kayu ( O 0.33 100,000 33,000
Kepala Tukang ( 0.03 150,000 4,950
Dolken kayu Ø 8- 2.00 25,000 50,000
Minyak bekisting 0.20 45,750 9,150
Paku Biasa 2" - 5" 0.40 25,000 10,000
Plywood 120x240 0.35 175,000 61,250
Balok Kayu 4x6-K. 0.02 3,100,000 46,500
Papan Kayu 2x20- 0.04 2,300,000 92,000
Mandor ( Oh ) 0.03 185,000 6,105

U-037
[ m2 ] (K3) Pemasangan bekisting untuk balok
Pekerja ( OH ) 0.66 85,000 56,100 378,355
Tukang Kayu ( O 0.33 100,000 33,000
Kepala Tukang ( 0.03 150,000 4,950
Dolken kayu Ø 8- 2.00 25,000 50,000
Minyak bekisting 0.20 45,750 9,150
Paku Biasa 2" - 5" 0.40 25,000 10,000
Plywood 120x240 0.35 175,000 61,250
Balok Kayu 4x6-K. 0.02 3,100,000 55,800
Papan Kayu 2x20- 0.04 2,300,000 92,000
Mandor ( Oh ) 0.03 185,000 6,105

U-038
[ m2 ] (K3) Pemasangan bekisting untuk lantai
Pekerja ( OH ) 0.66 85,000 56,100 469,055
Tukang Kayu ( O 0.33 100,000 33,000
Kepala Tukang ( 0.03 150,000 4,950
Dolken kayu Ø 8- 6.00 25,000 150,000
Minyak bekisting 0.20 45,750 9,150
Paku Biasa 2" - 5" 0.40 25,000 10,000
Plywood 120x240 0.35 175,000 61,250
Balok Kayu 4x6-K. 0.02 3,100,000 46,500
Papan Kayu 2x20- 0.04 2,300,000 92,000
Mandor ( Oh ) 0.03 185,000 6,105

U-040
[ m2 ] (K3) Pemasangan bekisting untuk tangga
Pekerja ( OH ) 0.66 85,000 56,100 343,768
Tukang Kayu ( O 0.33 100,000 33,000
Kepala Tukang ( 0.03 150,000 4,950
Dolken kayu Ø 8- 2.00 25,000 50,000
Minyak bekisting 0.15 45,750 6,863
Paku Biasa 2" - 5" 0.40 25,000 10,000
Plywood 120x240 0.35 175,000 61,250
Balok Kayu 4x6-K. 0.02 3,100,000 46,500
Papan Kayu 2x20- 0.03 2,300,000 69,000
Mandor ( Oh ) 0.03 185,000 6,105

U-143
[ m2 ] Pemasangan dinding batu tempel hitam
Pekerja ( OH ) 0.70 85,000 59,500 333,925
Tukang Batu ( OH 0.35 100,000 35,000
Kepala Tukang ( 0.04 150,000 5,250
Pasir Pasang ( m 0.04 255,000 8,925
Semen ( kg ) 11.75 1,300 15,275
Batu alam / temp 1.10 185,000 203,500
Mandor ( Oh ) 0.04 185,000 6,475

330/396
Data
U-125
[ unit ] Pekerjaan Pasangan Jendela type J2
Pekerja ( OH ) 0.50 85,000 42,500 835,450
Tukang Kayu ( O 0.80 100,000 80,000
Jendela Type J2 ( 1.00 600,000 600,000
Perlengkapan Um 0.40 250,000 100,000
Mandor ( Oh ) 0.07 185,000 12,950

U-127
[ unit ] Pekerjaan Pasangan Lubang Angin/Roster
Pekerja ( OH ) 0.01 85,000 850 35,700
Tukang Batu ( OH 0.05 100,000 5,000
Lubang Angin ( U 1.00 25,500 25,500
Perlengkapan Um 0.01 250,000 2,500
Mandor ( Oh ) 0.01 185,000 1,850

U-147
[ m2 ] Pasang Kuda-kuda baja ringan + reng untuk atap genteng biasa/metal
Pekerja ( OH ) 0.20 85,000 17,000 213,950
Tukang Besi ( OH 0.45 100,000 45,000
Kepala Tukang ( 0.01 150,000 1,500
Baja Ringan-C Tru 3.72 13,333 49,600
Baut Ramset / Di 1.60 15,000 24,000
Truss Screw ( bh 38.00 750 28,500
Baja Ringan-Reng 5.40 6,667 36,000
Talang Jurai ( m' 0.12 25,000 3,100
Mandor ( Oh ) 0.05 185,000 9,250

(empty)

331/396
DAFTAR HARGA SATUAN BAHAN DAN UPAH TERPAKAI
A002/T100.80/I-2020-Pembangunan Rumah Tinggal 2 Lantai Type 200
Jl. Ebony Raya No. 77, Komp. Villa Danau Matano, Kab. Luwu Timur

Kat.3 - all -
ID - all -

Data
Elemen Kode Item Nama Item Sum - Kebut Average - Harga DSum - Total Sum - Total
Biaya Upah L.1 Pekerja ( OH ) 1306.46 85,000 111,049,494 15.36%
L.9 Kepala Tukang ( OH ) 74.53 150,000 11,178,759 1.55%
L.3 Tukang Batu ( OH ) 329.97 100,000 32,997,351 4.56%
L.4 Tukang Besi ( OH ) 163.94 100,000 16,394,284 2.27%
L.2 Tukang Atap ( OH ) 15.00 100,000 1,500,000 0.21%
L.5 Tukang cat ( OH ) 69.29 100,000 6,928,660 0.96%
L.10 Mandor ( Oh ) 85.45 185,000 15,809,166 2.19%
L.6 Tukang Kayu ( OH ) 201.33 100,000 20,132,711 2.79%
L.8 Tukang Pipa ( Oh ) 0.30 100,000 30,000 0.00%
L.7 Tukang Listrik ( Oh ) 5.63 100,000 563,430 0.08%
Biaya Bahan M.82 Keramik Lantai 40x40 ( Bh ) 31.87 105,000 3,346,088 0.46%
M.100 Balok Kayu 5x10-K.II ( m3 ) 0.63 3,500,000 2,217,600 0.31%
M.128 Exhaust Fan ( unit ) 2.00 300,000 600,000 0.08%
M.33 Atap Genteng Metal ( Bh ) 210.02 112,000 23,522,400 3.25%
M.30 Hollow SS 40x40 ( m1 ) 23.76 83,333 1,980,000 0.27%
M.28 Pelat 1/8" ( m2 ) 3.34 265,000 884,901 0.12%
M.26 Hollow 4/4 Galvanish ( M1 ) 441.00 7,000 3,087,000 0.43%
M.7 Kerikil ( m3 ) 34.90 220,000 7,676,993 1.06%
M.41 Floor drain ( Unit ) 3.00 60,000 180,000 0.02%
M.32 Pipa SS Dia.2" ( m1 ) 9.90 82,500 816,750 0.11%
M.132 Pompa Air ( Unit ) 1.00 800,000 800,000 0.11%
M.143 Rol Cat ( ea ) 1.76 25,000 44,000 0.01%
M.106 Papan Kayu 2x20-K.II ( m3 ) 0.76 4,500,000 3,420,000 0.47%
M.29 Hollow SS 20x40 ( m1 ) 36.00 58,333 2,100,000 0.29%
M.1 Air ( Ltr ) 9567.76 50 478,388 0.07%
M.13 Semen Warna ( Kg ) 371.46 15,000 5,571,825 0.77%
M.125 Engsel Pintu ( bh ) 6.00 17,000 102,000 0.01%
M.129 Lampu 15W ( unit ) 8.00 39,000 312,000 0.04%
M.130 Lampu 20W ( unit ) 12.43 45,000 559,350 0.08%
M.36 Baja Ringan-C Truss ( m' ) 600.98 13,333 8,013,125 1.11%
M.141 Minyak bekisting ( Ltr ) 77.90 45,750 3,563,906 0.49%
M.16 Besi beton ( kg ) 6598.97 10,000 65,989,672 9.13%
M.24 Hollow 2/4 Galvanish ( M1 ) 220.50 5,000 1,102,500 0.15%
M.39 Talang Jurai ( m' ) 20.03 25,000 500,820 0.07%
M.134 Amplas ( Lbr ) 166.36 3,500 582,276 0.08%
M.93 Fitting Lampu ( unit ) 16.00 25,000 400,000 0.06%
M.83 Keramik Lantai 60x60 ( Bh ) 165.90 200,000 33,180,000 4.59%
M.81 Keramik Lantai 30x30 ( Bh ) 13.23 95,000 1,256,850 0.17%
M.50 Pipa PVC 3/4" ( M ) 79.20 5,500 435,600 0.06%
M.54 T Bow 4" ( bh ) 1.00 65,000 65,000 0.01%
M.92 MCB + Box ( Unit ) 2.00 350,000 700,000 0.10%
M.5 Batu belah ( m3 ) 48.15 250,000 12,037,320 1.67%
M.119 Pintu Utama (Kusen+Panel) Type P1 ( set ) 2.00 2,100,000 4,200,000 0.58%
M.15 Baja strip (0,2 x 2) cm ( kg ) 25.00 12,500 312,500 0.04%
M.22 Besi Ø8 (Polos) ( m1 ) 99.36 4,091 406,473 0.06%
M.8 Pasir beton ( M3 ) 22.54 250,000 5,634,440 0.78%
M.4 Batu alam / tempel ( m2 ) 2.75 185,000 508,750 0.07%
M.9 Pasir Pasang ( m3 ) 56.62 255,000 14,438,995 2.00%
M.2 Bata merah ( bh ) 23366.77 650 15,188,397 2.10%
M.11 Plamir ( Kg ) 86.69 12,000 1,040,230 0.14%
M.53 T Bow 3" ( bh ) 11.00 35,000 385,000 0.05%
M.91 Receiptackle ( unit ) 8.00 30,000 240,000 0.03%
M.27 Kawat beton ( kg ) 102.27 23,500 2,403,368 0.33%
M.96 Balok Kayu 3x4-K.II ( m3 ) 0.19 2,800,000 532,224 0.07%
M.104 Dolken kayu Ø 8-10/400 cm ( btg ) 1099.16 25,000 27,478,981 3.80%
M.105 Papan Kayu 2x20-K.I ( m3 ) 0.54 8,700,000 4,698,000 0.65%
M.107 Papan Kayu 2x20-K.III ( m3 ) 17.23 2,300,000 39,620,760 5.48%
M.46 Pipa PVC 1/2" ( M ) 42.00 4,000 168,000 0.02%
M.116 Suspension Rod ( bh ) 252.00 6,000 1,512,000 0.21%
M.45 Kran air ( M ) 6.00 25,000 150,000 0.02%
M.113 Screw ( bh ) 2407.97 500 1,203,985 0.17%
M.37 nok genteng metal ( Bh ) 29.60 83,000 2,456,783 0.34%
M.43 Kloset Duduk ( Unit ) 1.00 2,500,000 2,500,000 0.35%
M.47 Pipa PVC 1” ( m1 ) 1.00 6,000 6,000 0.00%
M.35 Baja Ringan-Reng Truss ( m' ) 872.40 6,667 5,815,978 0.80%
M.40 Dop 3" ( bh ) 1.00 35,000 35,000 0.00%
M.31 Grounding Rod ( btg ) 1.00 650,000 650,000 0.09%
M.98 Balok Kayu 4x6-K.II ( m3 ) 6.37 3,100,000 19,741,104 2.73%
M.120 Pintu Utama (Kusen+Panel) Type P2 ( set ) 7.00 1,600,000 11,200,000 1.55%
M.73 Tinner ( Ltr ) 0.66 60,000 39,600 0.01%
M.74 Ballnose Rope Tile 2.5x20 ( bh ) 945.00 2,500 2,362,500 0.33%
M.75 Keramik Dinding 20x40 ( m2 ) 24.20 85,000 2,057,000 0.28%
M.108 Baut M10 ( bh ) 18.00 5,000 90,000 0.01%
M.109 Baut Ramset / Dina Bolt ( bh ) 258.49 15,000 3,877,319 0.54%
M.110 Paku Biasa ½" - 1" ( Kg ) 36.20 23,500 850,714 0.12%
M.10 Pasir Urug ( m3 ) 8.00 200,000 1,600,884 0.22%

332/396
Data
M.49 Pipa PVC 3" ( m1 ) 98.20 8,000 785,600 0.11%
M.94 Balok Kayu 2x3-K.II ( m3 ) 0.06 2,200,000 139,447 0.02%
M.12 Semen ( kg ) 33799.63 1,300 43,939,517 6.08%
M.114 Truss Screw ( bh ) 6139.09 750 4,604,316 0.64%
M.60 Plywood 120x240 tbl. 9 mm ( Lbr ) 125.15 175,000 21,901,752 3.03%
M.122 Jendela Type J1 ( set ) 4.00 980,000 3,920,000 0.54%
M.62 Tripleks ( Lbr ) 63.36 85,000 5,385,600 0.75%
M.121 Pintu Utama (Kusen+Panel) Type P3 ( set ) 3.00 1,100,000 3,300,000 0.46%
M.117 Buis beton D. 80 cm ( BH ) 15.00 62,000 930,000 0.13%
M.118 Paving block 6 cm ( M2 ) 10.10 135,000 1,363,500 0.19%
M.112 Paku sekrup ( kg ) 13.86 750 10,395 0.00%
M.111 Paku Biasa 2" - 5" ( Kg ) 187.23 25,000 4,680,832 0.65%
M.88 Kabel NYM 3x2,5 mm2-SNI ( m1 ) 145.20 10,400 1,510,080 0.21%
M.56 Gypsum board 9 mm ( Lbr ) 45.86 87,000 3,990,168 0.55%
M.123 Jendela Type J2 ( set ) 3.00 600,000 1,800,000 0.25%
M.14 Tanah urug ( m3 ) 45.60 160,000 7,296,000 1.01%
M.55 Wastafel ( Unit ) 2.00 1,050,000 2,100,000 0.29%
M.126 Lubang Angin ( Unit ) 28.00 25,500 714,000 0.10%
M.44 Kloset Jongkok ( Unit ) 1.00 250,000 250,000 0.03%
M.127 Air Conditioner ( unit ) 1.00 4,800,000 4,800,000 0.66%
M.51 Pipa PVC 4" ( m1 ) 46.20 9,000 415,800 0.06%
M.52 Shower Mandi ( Unit ) 1.00 460,000 460,000 0.06%
M.63 Cat Dasar Tembok (Exterior) ( Kg ) 28.00 39,286 1,100,000 0.15%
M.65 Cat Tembok (Exterior) ( Kg ) 72.80 24,000 1,747,200 0.24%
M.72 Cat kayu ( Kg ) 5.72 60,000 343,200 0.05%
M.68 Cat Waterproofing ( kg ) 17.60 50,000 880,000 0.12%
M.67 Cat Plafon ( Kg ) 67.08 32,500 2,180,100 0.30%
M.66 Cat Tembok (Interior) ( Kg ) 38.46 20,000 769,233 0.11%
M.61 Seng Gelombang 3" x 6" BJLS 28 ( lbr ) 69.43 70,000 4,860,385 0.67%
M.64 Cat Dasar Tembok (Interior) ( Kg ) 14.79 26,190 387,434 0.05%
M.136 Jendela nako (rangka + kaca 5 mm) ( m2 ) 1.00 55,000 55,000 0.01%
M.144 Sealtape ( bh ) 0.15 4,500 675 0.00%
M.89 Kabel NYM 2x1,5 mm2-SNI ( m1 ) 303.60 5,600 1,700,160 0.24%
M.90 Saklar Listrik ( unit ) 8.00 25,000 200,000 0.03%
M.131 Lampu 5W ( unit ) 5.00 24,000 120,000 0.02%
M.87 Plint Keramik 10x60 ( Bh ) 187.00 12,000 2,244,000 0.31%
M.140 List kayu profil ( m ) 48.30 2,870 138,621 0.02%
M.69 Cat meni ( Kg ) 4.40 16,300 71,720 0.01%
M.71 Cat Dasar Kayu/Besi ( Kg ) 3.74 65,000 243,100 0.03%
M.138 Kuas ( Bh ) 0.38 17,000 6,460 0.00%
M.70 Cat Besi ( Kg ) 1.60 48,000 76,800 0.01%
M.137 Kawat las listrik ( kg ) 1.80 135,000 243,000 0.03%
M.142 Pohon Perdu ( unit ) 5.00 500,000 2,500,000 0.35%
M.139 Listrik PLN ( Ls ) 1.00 2,500,000 2,500,000 0.35%
M.135 Instalasi PDAM ( Ls ) 1.00 2,300,000 2,300,000 0.32%
Biaya Alat A.4 Perlengkapan Umum ( Ls ) 26.47 250,000 6,617,825 0.92%
A.1 Alat Bantu Kerja Paving Blok ( Ls ) 1.00 210,000 210,000 0.03%
A.5 Perlengkapan Umum Pipa ( Ls ) 71.05 20,000 1,421,000 0.20%
A.6 Sewa alat las ( jam ) 0.90 150,000 135,000 0.02%
(empty) (empty) (empty)
(empty) (empty) (empty)
Total Result 92608.54 255,489 722,863,124 100.00%

333/396
MATRIX ITEM SCHEDULING 19.11

7.64
A002/T100.80/I-2020-Pembangunan Rumah Tinggal 2 Lantai Type 200 3.01
5.93
-
0.67 0.67 0.67 1.54 0.50 0.50 0.50 0.50 0.50 0.50

1 2 3 4 5 6 7 8 9 10 11 12 13 14

Total Biaya : 722,863,124 0.67 0.67 0.67 3.01 19.11 7.64 1.54 5.93 0.50 0.50 0.50 0.50 0.50 0.50

7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
Elemen Nama Item Sum - Kebutuhan Average - Harga Dasar
Biaya Upah 0.04 0.34 0.08 0.03 0.05
Kepala Tukang 74.53
### 0.35 0.35 0.35 0.37 0.45 0.13 0.04 0.15 0.05 0.05 0.05 0.05 0.05 0.05
Pekerja ( OH ) 1306.46
### 0.32 0.32 0.32 0.54 1.54 1.12 0.37 1.38 0.45 0.45 0.45 0.45 0.45 0.45
Tukang Atap ( 15.00
###
Tukang Batu ( 329.97
### 0.11
Tukang Besi ( 163.94
### 0.31
Tukang Kayu ( 201.33
###
Tukang Pipa ( 0.30
### 0.26 0.66 0.22 0.22 0.22

Tukang Listrik 5.63


###
Mandor ( Oh 85.45
###
Tukang cat ( 69.29
###
Biaya Bahan 0.04

Air ( Ltr ) 9567.76


###
Amplas ( Lbr ) 166.36
###
Baja Ringan-C 600.98
###
Baja strip (0,2 25.00
###
Bata merah ( 23366.77
###
Batu belah ( 48.15
###
Baut Ramset / 258.49
### 4.64
Besi beton ( k 6598.97
###
Cat kayu ( Kg 5.72
###
Cat meni ( Kg 4.40
###
Dolken kayu Ø 1099.16
###
Floor drain ( U 3.00
###
Gypsum board 45.86
### 0.16
Kawat beton ( 102.27
###
Kran air ( M ) 6.00
###
Kuas ( Bh ) 0.38
### 0.04 0.04 0.04
Minyak bekisti 77.90
###
nok genteng m 29.60
### 0.09
Paku Biasa 2" 187.23
### 0.01 0.38 0.06 0.06 0.06
Paku sekrup ( 13.86
###
Pasir Pasang ( 56.62
### 0.50
Pasir Urug ( m 8.00
###
Paving block 10.10
### 0.04 0.12
Pipa PVC 1/2" 42.00
###
Pipa PVC 3/4" 79.20
###
Plywood 120x2 125.15
###
Screw ( bh ) 2407.97
###
Sealtape ( bh 0.15
###

334/396
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
Semen ( kg ) 33799.63
### 0.07

Semen Warna 371.46


###
Wastafel ( Uni 2.00
### 1.92

Pintu Utama ( 2.00


###
Pintu Utama ( 7.00
### 2.76

Pintu Utama ( 3.00


###
Jendela Type J 4.00
###
Jendela Type J 3.00
###
Lubang Angin 28.00
###
Shower Mandi 1.00
###
MCB + Box ( U 2.00
###
Kabel NYM 3x 145.20
###
Kabel NYM 2x 303.60
###
Fitting Lampu 16.00
###
Saklar Listrik 8.00
###
Receiptackle ( 8.00
###
Lampu 5W ( un 5.00
###
Lampu 15W ( u 8.00
###
Lampu 20W ( u 12.43
###
Rol Cat ( ea ) 1.76
###
Pohon Perdu ( 5.00
###
Pompa Air ( U 1.00
###
Exhaust Fan ( 2.00
###
Air Conditione 1.00
###
Tripleks ( Lbr 63.36
###
Kerikil ( m3 ) 34.90
###
Engsel Pintu ( 6.00
###
Jendela nako 1.00
### 5.39
Pipa PVC 4" ( 46.20
### 0.07 0.68
Pipa PVC 3" ( 98.20
### 0.10
Pipa PVC 1” ( 1.00
### 0.06
T Bow 4" ( bh 1.00
###
T Bow 3" ( bh 11.00
###
Dop 3" ( bh ) 1.00
###
Pelat 1/8" ( m 3.34
###
Baut M10 ( bh 18.00
###
Buis beton D. 15.00
###
Tanah urug ( 45.60
###
Kloset Duduk ( 1.00
###
Kloset Jongkok 1.00
###
Besi Ø8 (Polos 99.36
###
Cat Waterproo 17.60
###
Listrik PLN ( L 1.00
###
Instalasi PDAM 1.00
###
Balok Kayu 5x1 0.63
###
Balok Kayu 4x6 6.37
###
Balok Kayu 3x4 0.19
###
Balok Kayu 2x3 0.06
### 2.22
Papan Kayu 2x 0.76
### 0.97 1.19
Keramik Lanta 165.90
### 0.53

335/396
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Data
Keramik Lanta 31.87
### 0.14

Keramik Lanta 13.23


### 0.82 2.60

Keramik Dindi 24.20


###
Plint Keramik 187.00
###
List kayu profi 48.30
###
Cat Plafon ( K 67.08
###
Batu alam / t 2.75
###
Ballnose Rope 945.00
###
Hollow SS 40x 23.76
###
Hollow SS 20x 36.00
###
Pipa SS Dia.2" 9.90
###
Kawat las listr 1.80
###
Papan Kayu 2x 17.23
###
Atap Genteng 210.02
###
Papan Kayu 2x 0.54
###
Cat Dasar Kayu 3.74
### 0.77 0.77 0.77
Tinner ( Ltr ) 0.66
###
Cat Dasar Tem 28.00
###
Cat Tembok (Ex 72.80
###
Cat Dasar Temb 14.79
###
Cat Tembok (In 38.46
###
Cat Besi ( Kg ) 1.60
###
Truss Screw ( 6139.09
###
Baja Ringan-R 872.40
###
Talang Jurai ( 20.03
###
Hollow 4/4 Ga 441.00
###
Hollow 2/4 Ga 220.50
###
Suspension Ro 252.00
###
Grounding Rod 1.00
###
Paku Biasa ½" 36.20
###
Pasir beton ( 22.54
###
Plamir ( Kg ) 86.69
###
Seng Gelomban 69.43
###
Biaya Alat 0.50

Perlengkapan 26.47
###
Sewa alat las 0.90
###
Perlengkapan 71.05
###
Alat Bantu Ker 1.00
###
(empty)
(empty)
(empty)
(empty)

336/396
GANTT CHART SCHEDULING 19.11

A002/T100.80/I-2020-Pembangunan Rumah Tinggal 2 Lantai Type 200 3.01


7.64 5.93
0.67 0.67 0.67 1.54 0.50 0.50 0.50 0.50 0.50 0.50

### 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Elemen - all - : (ALL) Start 7-Apr-20 0.67 0.67 0.67 3.01 19.11 7.64 1.54 5.93 0.50 0.50 0.50 0.50 0.50 0.50
Kat.3 - all - : SEMUA DIVISI DIPILIH Finish 7-Aug-20 0.1% 0.1% 0.1% 0.4% 2.6% 1.1% 0.2% 0.8% 0.1% 0.1% 0.1% 0.1% 0.1% 0.1%
Total Biaya : 722,863,124 Sel Rab Kam Jum Sab Min Sen Sel Rab Kam Jum Sab Min Sen

XXXXXX
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Uraian Pekerjaan Bobot Mulai Selesai D
ID Sum - Total
A01 2,662,500 Pembersihan Area/Lokasi Kerja 0.37% 7-Apr-2020 10-Apr-2020 4 0.00 0.00 0.00 0.00
A02 4,686,500 Pengukuran dan Pemasangan Bowplank 0.65% 10-Apr-2020 11-Apr-2020 2 0.00 0.00
A03 8,092,696 Pembuatan Gudang Bahan 1.12% 11-Apr-2020 11-Apr-2020 1 0.01
A04 8,147,696 Pembuatan Direksi Ket/Bedeng Pekerja 1.13% 11-Apr-2020 11-Apr-2020 1 0.01
B01 1,043,348 Pekerjaan Galian Pile Cap 0.14% 11-Apr-2020 12-Apr-2020 2 0.00 0.00
B02 133,675 Urugan Pasir Pile Cap 0.02% 12-Apr-2020 12-Apr-2020 1 0.00
B03 5,448,871 Pekerjaan Pembesian Pondasi Tapak 0.75% 12-Apr-2020 12-Apr-2020 1 0.01
B04 4,611,222 Pekerjan Bekisting Pondasi Tapak 0.64% 12-Apr-2020 14-Apr-2020 3 0.00 0.00 0.00
B05 3,892,724 Pekerjaan Cor Beton (K-225) 0.54% 14-Apr-2020 14-Apr-2020 1 0.01
B06 3,977,383 Pekerjaan Galian Pondasi 0.55% 14-Apr-2020 21-Apr-2020 8 0.00 0.00 0.00 0.00 0.00 0.00 0.00
B07 773,818 Urugan Pasir Dibawah Pondasi Batu Kali 0.11% 21-Apr-2020 21-Apr-2020 1
B08 4,382,975 Pek. Pemasangan Batu Kosong (Aanstamping) 0.61% 21-Apr-2020 22-Apr-2020 2
B09 27,774,518 Pekerjaan Pasangan Batu Pondasi ( 1 : 3) 3.84% 22-Apr-2020 29-Apr-2020 8
B10 28,841 Pekerjaan Galian 0.00% 29-Apr-2020 29-Apr-2020 1
B11 22,373 Pek. Pasangan Pondasi Rollag 0.00% 29-Apr-2020 29-Apr-2020 1
C01 7,921,497 Pekerjaan Pembesian 1.10% 29-Apr-2020 29-Apr-2020 1
C02 7,468,224 Pekerjaan Bekisting 1.03% 29-Apr-2020 2-May-2020 4
C03 3,746,381 Pekerjaan Cor Beton 0.52% 2-May-2020 2-May-2020 1
C04 841,711 Pekerjaan Pembesian 0.12% 29-Apr-2020 29-Apr-2020 1
C05 1,244,704 Pekerjaan Bekisting 0.17% 2-May-2020 2-May-2020 1
C06 468,298 Pekerjaan Cor Beton 0.06% 2-May-2020 2-May-2020 1
D01 8,335,300 Urugan, Timbunan dan Peninggian Elevasi 1.15% 3-May-2020 4-May-2020 2
D02 235,980 Pemadatan Tanah 0.03% 5-May-2020 5-May-2020 1
E01 6,035,492 Pekerjaan Pembesian (8d12&15-d8) 0.83% 4-May-2020 4-May-2020 1
E02 18,600,372 Pekerjaan Bekisting 2.57% 4-May-2020 9-May-2020 6
E03 4,214,679 Pekerjaan Cor Beton (K-225) 0.58% 9-May-2020 9-May-2020 1
E04 2,343,332 Pekerjaan Pembesian (4d12&18 cm-d6) 0.32% 5-May-2020 5-May-2020 1
E05 10,185,918 Pekerjaan Bekisting 1.41% 10-May-2020 12-May-2020 3
E06 1,009,767 Pekerjaan Cor Beton (K-225) 0.14% 10-May-2020 10-May-2020 1
E07 6,098,144 Pekerjaan Pembesian (8d12&15-d8) 0.84% 19-Jun-2020 19-Jun-2020 1
E08 16,828,908 Pekerjaan Bekisting 2.33% 19-Jun-2020 23-Jun-2020 5
E09 3,336,621 Pekerjaan Cor Beton (K-225) 0.46% 23-Jun-2020 23-Jun-2020 1
E10 1,631,206 Pekerjaan Pembesian (4d12&18 cm-d6) 0.23% 19-Jun-2020 19-Jun-2020 1
E11 7,085,856 Pekerjaan Bekisting 0.98% 23-Jun-2020 25-Jun-2020 3
E12 702,446 Pekerjaan Cor Beton (K-200) 0.10% 23-Jun-2020 23-Jun-2020 1
F01 10,034,555 Pekerjaan Pembesian (7d12&15-d8) 1.39% 11-May-2020 12-May-2020 2
F02 16,950,304 Pekerjaan Bekisting 2.34% 12-May-2020 16-May-2020 5
F03 4,370,778 Pekerjaan Cor Beton (K-225) 0.60% 16-May-2020 16-May-2020 1
F04 1,679,632 Pekerjaan Pembesian (7d12&15-d8) 0.23% 12-May-2020 12-May-2020 1

337/396
XXXXXX
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Uraian Pekerjaan Bobot Mulai Selesai D
ID Sum - Total
F05 4,842,944 Pekerjaan Bekisting 0.67% 16-May-2020 17-May-2020 2
F06 936,595 Pekerjaan Cor Beton (K-225) 0.13% 16-May-2020 16-May-2020 1
F07 6,248,180 Pekerjaan Pembesian (7d12&15-d8) 0.86% 24-Jun-2020 24-Jun-2020 1
F08 13,015,412 Pekerjaan Bekisting 1.80% 25-Jun-2020 28-Jun-2020 4
F09 4,195,166 Pekerjaan Cor Beton (K-225) 0.58% 20-Jun-2020 20-Jun-2020 1
F10 1,313,042 Pekerjaan Pembesian (7d12&15-d8) 0.18% 24-Jun-2020 24-Jun-2020 1
F11 3,783,550 Pekerjaan Bekisting 0.52% 28-Jun-2020 29-Jun-2020 2
F12 731,715 Pekerjaan Cor Beton (K-225) 0.10% 20-Jun-2020 20-Jun-2020 1
G01 24,521,015 Pekerjaan Pembesian Plate lantai 3.39% 14-May-2020 17-May-2020 4
G02 42,214,950 Pekerjaan Bekisting 5.84% 17-May-2020 26-May-2020 10
G03 11,414,755 Pekerjaan Cor Beton (K-225) 1.58% 27-May-2020 29-May-2020 3
G04 592,480 Pekerjaan Pembesian Plat Atap/kanopi beton 0.08% 17-May-2020 17-May-2020 1
G05 2,814,330 Pekerjaan Bekisting 0.39% 26-May-2020 26-May-2020 1
G06 585,372 Pekerjaan Cor Beton (K-225) 0.08% 29-May-2020 29-May-2020 1
H01 15,989,004 Pek. Pasangan Bata Merah (1/2, Mix 1:5) 2.21% 19-Jun-2020 25-Jun-2020 7
H02 1,669,417 Pek. Pasangan Bata Merah Trassram (1/2, Mix 1:3) 0.23% 19-Jun-2020 19-Jun-2020 1
H03 17,225,376 Pekerjaan Plasteran (1.5 cm-mix 1:5) 2.38% 19-Jun-2020 3-Jul-2020 15
H04 10,112,496 Pekerjaan Acian 1.40% 26-Jun-2020 5-Jul-2020 10
H05 14,650,756 Pek. Pasangan Bata Merah (1/2, Mix 1:5) 2.03% 22-Jun-2020 27-Jun-2020 6
H06 1,529,690 Pek. Pasangan Bata Merah Trassram (1/2, Mix 1:3) 0.21% 22-Jun-2020 22-Jun-2020 1
H07 15,783,646 Pekerjaan Plasteran (1.5 cm-mix 1:5) 2.18% 20-Jun-2020 2-Jul-2020 13
H08 9,266,100 Pekerjaan Acian 1.28% 26-Jun-2020 4-Jul-2020 9
I01 34,564,680 Memasang Rangka Atap (Baja Ringan-Ex TASO) 4.78% 4-Jul-2020 15-Jul-2020 12
I02 28,915,912 Memasang Pelapis Atap (Metal Roof-Ex Sakura Roo 4.00% 15-Jul-2020 20-Jul-2020 6
I03 3,591,128 Memasang Nok Atap 0.50% 18-Jul-2020 19-Jul-2020 2
I04 6,444,250 Memasang Lisplank 0.89% 18-Jul-2020 19-Jul-2020 2
I05 4,861,500 Memasang Talang Air 0.67% 19-Jul-2020 21-Jul-2020 3
J01 4,682,000 Memasang Kusen+Panel Pintu Utama 0.65% 23-Jul-2020 23-Jul-2020 1
J02 12,887,000 Memasang Kusen+Panel Pintu Kamar/Ruangan 1.78% 23-Jul-2020 24-Jul-2020 2
J03 4,023,000 Memasang Kusen+Panel Pintu WC 0.56% 23-Jul-2020 23-Jul-2020 1
J04 4,499,000 Memasang Kusen+Panel Jendela Utama 0.62% 22-Jul-2020 22-Jul-2020 1
J05 2,506,350 Memasang Jendela Pencahayaan/ Tetap (Fixed Wind 0.35% 21-Jul-2020 21-Jul-2020 1
J06 999,600 Memasang Lubang Angin/Loster (Bovenlight) 0.14% 20-Jul-2020 20-Jul-2020 1
K01 1,579,380 Memasang Instalasi Pipa 3/4 PVC (Ex Maspion) 0.22% 3-Jul-2020 3-Jul-2020 1
K02 774,550 Memasang Instalasi Pipa 1/2 PVC (Ex Maspion) 0.11% 3-Jul-2020 3-Jul-2020 1
K03 437,325 Memasang Keran Air Standar ( Ex Onda) 0.06% 3-Jul-2020 3-Jul-2020 1
K04 5,886,012 Memasang Shower Mandi ( Ex TOTO) 0.81% 3-Jul-2020 5-Jul-2020 3
K05 516,625 Memasang Tangki Air/Tandom (Ex Penguin-1000L) 0.07% 5-Jul-2020 5-Jul-2020 1
K06 2,623,500 Memasang Instalasi Pipa Limbah 3" PVC (Ex Maspi 0.36% 3-Jul-2020 4-Jul-2020 2
K07 1,474,200 Memasang Instalasi Pipa Kloset 4" PVC (Ex Maspio 0.20% 3-Jul-2020 3-Jul-2020 1
K08 2,936,600 Memasang Kloset Duduk ( Ex TOTO) 0.41% 3-Jul-2020 3-Jul-2020 1
K09 547,450 Memasang Kloset Jongkok ( Ex TOTO) 0.08% 3-Jul-2020 3-Jul-2020 1
K10 2,741,900 Memasang Wastafel Cuci 0.38% 3-Jul-2020 3-Jul-2020 1
K11 219,825 Memasang Floor Drain 0.03% 3-Jul-2020 3-Jul-2020 1
K12 3,040,999 Pekerjaan Septik Tank Double Kompartmen 0.42% 11-May-2020 12-May-2020 2
K13 1,471,503 Pekerjaan Sumur Resapan Limbah 0.20% 12-May-2020 12-May-2020 1
L01 1,015,400 Pemasangan MCB Pengaman dan Box 0.14% 27-Jul-2020 27-Jul-2020 1
L02 807,700 Pemasangan Instalasi Pembumian (Grounding) 0.11% 27-Jul-2020 27-Jul-2020 1
L03 2,410,320 Pemasangan Kabel Instalasi ( NYM-3x2,5 mm2) 0.33% 27-Jul-2020 27-Jul-2020 1

338/396
XXXXXX
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Uraian Pekerjaan Bobot Mulai Selesai D
ID Sum - Total
L04 3,237,480 Pemasangan Kabel Instalasi ( NYM-3x1,5 mm2) 0.45% 27-Jul-2020 28-Jul-2020 2
L05 572,320 Pemasangan Fitting Lampu 0.08% 28-Jul-2020 28-Jul-2020 1
L06 294,160 Pemasangan Saklar Lampu 0.04% 28-Jul-2020 28-Jul-2020 1
L07 337,520 Pemasangan Receiptackle (Colokan Listrik) 0.05% 28-Jul-2020 28-Jul-2020 1
L08 155,425 Pasang Lampu 5 Watt 0.02% 28-Jul-2020 28-Jul-2020 1
L09 368,680 Pasang Lampu 10 Watt 0.05% 28-Jul-2020 28-Jul-2020 1
L10 156,255 Pasang Lampu 20 Watt 0.02% 28-Jul-2020 28-Jul-2020 1
M01 491,162 Pekerjaan Cor Lantai Kerja Non Struktur (K100- 1:4: 0.07% 20-Jul-2020 20-Jul-2020 1
M02 46,274,250 Memasang Keramik Lantai Utama (Ex Granito 60x6 6.40% 20-Jul-2020 26-Jul-2020 7
M03 3,457,260 Memasang Keramik Lantai Teras (Ex Platinum 40x4 0.48% 26-Jul-2020 26-Jul-2020 1
M04 3,187,170 Memasang Keramik Lantai WC (Ex Asia Tile 20x20) 0.44% 26-Jul-2020 27-Jul-2020 2
M05 6,121,610 Memasang Keramik Dinding WC (Ex Roman 20x40) 0.85% 27-Jul-2020 30-Jul-2020 4
M06 4,737,920 Memasang Plint Keramik Dinding (Ex Granito 10x60 0.66% 30-Jul-2020 1-Aug-2020 3
M07 5,401,340 Memasang Rope Tile (Kuku Tegel/Plint Sudut) 0.75% 1-Aug-2020 3-Aug-2020 3
N01 16,705,080 Memasang Rangka Plafon Hollow Galvanish 2.31% 20-Jul-2020 29-Jul-2020 10
N02 5,912,613 Memasang Pelapis Plafon ( Ex Gipsum Board 9mm) 0.82% 29-Jul-2020 31-Jul-2020 3
N03 635,651 Memasang List Plafon 0.09% 31-Jul-2020 31-Jul-2020 1
O01 2,010,000 Pekerjaan Plamir Dinding 0.28% 11-Jul-2020 12-Jul-2020 2
O02 3,352,800 Pekerjaan Cat Anti Lumut dan Waterprofing 0.46% 10-Jul-2020 11-Jul-2020 2
O03 5,342,354 Pekerjaan Pengecatan Exterior ( Ex Mowilex) 0.74% 9-Jul-2020 11-Jul-2020 3
O04 2,481,552 Pekerjaan Pengecatan Interior ( Ex Nippon Paint) 0.34% 9-Jul-2020 10-Jul-2020 2
O05 4,940,700 Pekerjaan Pengecatan Plafon( Ex Mowilex) 0.68% 1-Aug-2020 3-Aug-2020 3
O06 939,070 Pekerjaan Pengecatan Kayu ( Ex Avian) 0.13% 1-Aug-2020 1-Aug-2020 1
O07 482,120 Pekerjaan Pengecatan Besi ( Ex Avian) 0.07% 30-Jul-2020 30-Jul-2020 1
P01 2,005,800 Pekerjaan Pembesian Tangga 0.28% 19-Jun-2020 19-Jun-2020 1
P02 4,856,325 Pekerjaan Bekisting Tangga 0.67% 19-Jun-2020 20-Jun-2020 2
P03 3,118,207 Pekerjaan Cor Beton Tangga (K-225) 0.43% 20-Jun-2020 20-Jun-2020 1
P04 820,358 Pekerjaan Plasteran ( 1,5 cm- 1: 5) 0.11% 20-Jun-2020 20-Jun-2020 1
P05 2,372,065 Pekerjaan Keramik Tangga ( Ex Asia Tile 40x40) 0.33% 20-Jun-2020 20-Jun-2020 1
P06 823,375 Pekerjaan Rope Tile 0.11% 20-Jun-2020 20-Jun-2020 1
P07 208,940 Pekerjaan Plamir 0.03% 20-Jun-2020 20-Jun-2020 1
P08 257,958 Pekerjaan Pengecatan Tangga 0.04% 20-Jun-2020 20-Jun-2020 1
P09 5,795,400 Pekerjaan Railing Tangga 0.80% 20-Jun-2020 20-Jun-2020 1
Q01 98,460 Pekerjaan Galian Pondasi 0.01% 15-May-2020 15-May-2020 1
Q02 885,302 Pasangan Batu Pondasi 0.12% 14-May-2020 14-May-2020 1
Q03 258,334 Pekerjaan Pembesian Sloof 0.04% 13-May-2020 13-May-2020 1
Q04 175,037 Pekerjaan Bekisting Sloof 0.02% 12-May-2020 12-May-2020 1
Q05 128,818 Pekerjaan Pengecoran (K200) 0.02% 11-May-2020 11-May-2020 1
Q06 237,106 Pekerjaan Pembesian Kolom 0.03% 10-May-2020 10-May-2020 1
Q07 480,826 Pekerjaan Bekisting Kolom 0.07% 9-May-2020 9-May-2020 1
Q08 116,549 Pekerjaan Pengecoran (K200) 0.02% 8-May-2020 8-May-2020 1
Q09 258,334 Pekerjaan Pembesian Balok 0.04% 7-May-2020 7-May-2020 1
Q10 510,779 Pekerjaan Bekisting Balok 0.07% 6-May-2020 6-May-2020 1
Q11 128,818 Pekerjaan Pengecoran (K200) 0.02% 5-May-2020 5-May-2020 1
Q12 1,839,193 Pasangan Batu Bata 0.25% 4-May-2020 4-May-2020 1
Q13 1,413,461 Pekerjaan Plasteran 0.20% 4-May-2020 5-May-2020 2
Q14 86,438 Pekerjaan Acian 0.01% 5-May-2020 5-May-2020 1
Q15 834,813 Pekerjaan Pasangan Batu Alam 0.12% 5-May-2020 5-May-2020 1
Q16 500,846 Pekerjaan Pengecatan 0.07% 5-May-2020 5-May-2020 1

339/396
XXXXXX
7-Apr-20

10-Apr-20

11-Apr-20

12-Apr-20

13-Apr-20

14-Apr-20

15-Apr-20

16-Apr-20

17-Apr-20

18-Apr-20

19-Apr-20

20-Apr-20
8-Apr-20

9-Apr-20
Uraian Pekerjaan Bobot Mulai Selesai D
ID Sum - Total
Q17 2,203,125 Pekerjaan Pemasangan Paving Blok 0.30% 5-May-2020 5-May-2020 1
Q18 2,801,750 Pekerjaan Penanaman Pohon Perdu 0.39% 5-May-2020 5-May-2020 1
R01 2,500,000 Pekerjaan Pemasangan Meteran Listrik (PLN-2200 0.35% 28-Jul-2020 28-Jul-2020 1
R02 2,300,000 Pekerjaan Pemasangan Meteran Air (PDAM) 0.32% 29-Jul-2020 29-Jul-2020 1
R03 957,700 Pekerjaan Pemasangan Pompa Air 0.13% 30-Jul-2020 30-Jul-2020 1
R04 624,380 Pemasangan Exhaust Fan 0.09% 31-Jul-2020 31-Jul-2020 1
R05 4,812,190 Pemasangan AC (Air Conditioner-1 PK, Ex. Sharp) 0.67% 1-Aug-2020 1-Aug-2020 1
R06 3,915,000 Pembersihan Area Kerja (Pasca Konstruksi) 0.54% 2-Aug-2020 7-Aug-2020 6
(empty)
(empty)

340/396
LAPORAN PENJADWALAN KURVA S 0% A002/T100.80/I-2020-Pembangunan Rumah Tinggal 2 Lantai Type 200
W 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Elemen - all - Start 7-Apr-20 B 0.05 0.02 0.02 0.07 0.04 0.07 0.07 0.07 0.03 0.03 0.10 0.07 0.07 0.03 0.10 0.10 0.07 0.01

Finish 7-Aug-20 % 5% 7% 9% 16% 20% 27% 33% 40% 43% 46% 55% 62% 69% 72% 82% 92% 99% 100%

12-May-20

19-May-20

26-May-20
14-Apr-20

21-Apr-20

28-Apr-20

16-Jun-20

23-Jun-20

30-Jun-20
Tanggal

5-May-20

4-Aug-20
14-Jul-20

21-Jul-20

28-Jul-20
7-Apr-20

2-Jun-20

9-Jun-20

7-Jul-20
NAMA PEKERJAAN Mulai Selesai Durasi
Kat.3 Sum - Total
A 3.26% PEKERJAAN PERSIAPAN 1 1 1 100% 99% 100% 100% 100% 100
0.03
B 7.21% PEKERJAAN PONDASI 1 4 4 0.02 0.02 0.02 0.02 92%
C 3.00% PEKERJAAN SLOOF 4 4 1 0.03
D 1.19% PEKERJAAN TIMBUNAN 4 5 2 0.01 0.01 82%
E 10.80% PEKERJAAN KOLOM 4 12 9 75% 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
72%
F 9.42% PEKERJAAN RINGBALOK (BALOK) 5 12 8 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 69%
G 11.36% PEKERJAAN COR PLATE BETON (DAK BETON) 6 8 3 0.04 0.04 0.04 62%
H 11.93% PEKERJAAN DINDING 11 13 3 0.04 0.04 0.04
55%
I 10.84% PEKERJAAN ATAP 13 16 4 50% 0.03 0.03 0.03 0.03
-
J 4.09% PEKERJAAN PINTU, JENDELA DAN ACCESORIS 15 16 2 46% 0.02 0.02
43%
K 3.35% PEKERJAAN INST. PIPA AIR BERSIH &SANITASI 5 13 9 0.00 0.00 0.00 40%0.00 0.00 0.00 0.00 0.00 0.00
L 1.29% PEKERJAAN INST. LISTRIK DAN PENERANGAN 16 17 2 33% 0.01 0.01
M 9.64% PEKERJAAN KERAMIK LANTAI DAN DINDING 15 17 3 27% 0.03 0.03 0.03
N 3.22% PEKERJAAN LANGIT-LANGIT (PLAFON) 15 17 3 25% 20% 0.01 0.01 0.01
O 2.70% PEKERJAAN PENGECATAN DAN WATERPROFING 14 17 4 16% 0.01 0.01 0.01 0.01
P 2.80% PEKERJAAN TANGGA 11 11 1 9% 0.03
7%
Q 1.79% PEKERJAAN PAGAR DAN TAMAN/HALAMAN 4 6 3 5% 0.01 0.01 0.01
R 2.09% PEKERJAAN TAMBAHAN DAN LAINNYA 17 18 2 0% 0.01 0.01
(empty)
(empty)

Disusun Oleh :

341/396
KALENDER PROJECT A002/T100.80/I-2020-Pembangunan Rumah Tinggal 2 Lantai Type 200

2020-2021 123 Hari Kalendar - 17,6 Minggu - 4,1 Bulan


29-Mar-21 Today (Hari Ini)
March '20 April '20 May '20 7-Apr-20 Project Mulai (Start)
S M T W T F S S M T W T F S S M T W T F S Mulai Selesai DIVISI PEKERJAAN UTAMA
1 2 3 4 5 6 7 1 2 3 4 1 2 7-Apr-20 11-Apr-20 PEKERJAAN PERSIAPAN-(5d)
8 9 10 11 12 13 14 5 6 7 8 9 10 11 3 4 5 6 7 8 9 11-Apr-20 29-Apr-20 PEKERJAAN PONDASI-(19d)
15 16 17 18 19 20 21 12 13 14 15 16 17 18 10 11 12 13 14 15 16 29-Apr-20 2-May-20 PEKERJAAN SLOOF-(4d)
22 23 24 25 26 27 28 19 20 21 22 23 24 25 17 18 19 20 21 22 23 3-May-20 5-May-20 PEKERJAAN TIMBUNAN-(3d)
29 30 31 26 27 28 29 30 24 25 26 27 28 29 30 4-May-20 25-Jun-20 PEKERJAAN KOLOM-(53d)
31 11-May-20 29-Jun-20 PEKERJAAN RINGBALOK (BALOK)-(50d)
14-May-20 29-May-20 PEKERJAAN COR PLATE BETON (DAK BETON)-(16d)
June '20 July '20 August '20 19-Jun-20 5-Jul-20 PEKERJAAN DINDING-(17d)
S M T W T F S S M T W T F S S M T W T F S 4-Jul-20 21-Jul-20 PEKERJAAN ATAP-(18d)
1 2 3 4 5 6 1 2 3 4 1 20-Jul-20 24-Jul-20 PEKERJAAN PINTU, JENDELA DAN ACCESORIS-(5d)
7 8 9 10 11 12 13 5 6 7 8 9 10 11 2 3 4 5 6 7 8 11-May-20 5-Jul-20 PEKERJAAN INST. PIPA AIR BERSIH &SANITASI-(56d)
14 15 16 17 18 19 20 12 13 14 15 16 17 18 9 10 11 12 13 14 15 27-Jul-20 28-Jul-20 PEKERJAAN INST. LISTRIK DAN PENERANGAN-(2d)
21 22 23 24 25 26 27 19 20 21 22 23 24 25 16 17 18 19 20 21 22 20-Jul-20 3-Aug-20 PEKERJAAN KERAMIK LANTAI DAN DINDING-(15d)
28 29 30 26 27 28 29 30 31 23 24 25 26 27 28 29 20-Jul-20 31-Jul-20 PEKERJAAN LANGIT-LANGIT (PLAFON)-(12d)
30 31 9-Jul-20 3-Aug-20 PEKERJAAN PENGECATAN DAN WATERPROFING-(26d)
19-Jun-20 20-Jun-20 PEKERJAAN TANGGA-(2d)
September '20 October '20 November '20 4-May-20 15-May-20 PEKERJAAN PAGAR DAN TAMAN/HALAMAN-(12d)
S M T W T F S S M T W T F S S M T W T F S 28-Jul-20 7-Aug-20 PEKERJAAN TAMBAHAN DAN LAINNYA-(11d)
1 2 3 4 5 1 2 3 1 2 3 4 5 6 7 . .
6 7 8 9 10 11 12 4 5 6 7 8 9 10 8 9 10 11 12 13 14 . .
13 14 15 16 17 18 19 11 12 13 14 15 16 17 15 16 17 18 19 20 21 . .
20 21 22 23 24 25 26 18 19 20 21 22 23 24 22 23 24 25 26 27 28 . .
27 28 29 30 25 26 27 28 29 30 31 29 30 . .
. .

December '20 January '21 February '21 24-Mar-20 31-Mar-20 Termin 1


S M T W T F S S M T W T F S S M T W T F S 2-May-20 9-May-20 Termin 2
1 2 3 4 5 1 2 1 2 3 4 5 6 26-May-20 2-Jun-20 Termin 3
6 7 8 9 10 11 12 3 4 5 6 7 8 9 7 8 9 10 11 12 13 20-Jun-20 27-Jun-20 Termin 4
13 14 15 16 17 18 19 10 11 12 13 14 15 16 14 15 16 17 18 19 20 14-Jul-20 21-Jul-20 Termin 5
20 21 22 23 24 25 26 17 18 19 20 21 22 23 21 22 23 24 25 26 27 7-Aug-20 Project Selesai (Finish)
27 28 29 30 31 24 25 26 27 28 29 30 28 14-Aug-20 Serah Terima
31
DAFTAR UMP 34 PROVINSI DI INDONESIA Update : thn 2020

No Provinsi Kota UMP-2020 Rate (Hari) Rate (Jam) Index Upah Index Bahan Index Alat

1 Nanggroe Aceh Darusalam Banda Aceh  3,165,030 126,601.20 15,825 1.18 1.46 1.36
2 Sumatera Utara Medan  2,499,422 99,976.88 12,497 0.94 1.15 1.08
3 Sumatera Barat Padang  2,484,041 99,361.64 12,420 0.93 1.14 1.07
4 Riau Pekanbaru  2,888,563 115,542.52 14,443 1.08 1.33 1.24
5 Jambi Jambi  2,630,161 105,206.44 13,151 0.98 1.21 1.13
6 Kepulauan Riau Tanjungpinang  3,005,383 120,215.32 15,027 1.12 1.38 1.29
7 Bengkulu Bengkulu  2,213,604 88,544.16 11,068 0.83 1.02 0.95
8 Sumatera Selatan Palembang  3,043,111 121,724.44 15,216 1.14 1.40 1.31
9 Bangka Belitung Pangkal Pinang  3,230,022 129,200.88 16,150 1.21 1.49 1.39
10 Lampung Bandar Lampung  2,431,324 97,252.96 12,157 0.91 1.12 1.05
11 DKI Jakarta Jakarta  4,267,349 170,693.96 21,337 1.60 1.96 1.84
12 Banten Kota Serang  2,460,968 98,438.72 12,305 0.92 1.13 1.06
13 Jawa Barat Bandung  1,810,350 72,414.00 9,052 0.68 0.83 0.78
14 DI Yogyakarta Yogyakarta  2,004,000 80,160.00 10,020 0.75 0.92 0.86
15 Jawa Tengah Semarang  1,742,015 69,680.60 8,710 0.65 0.80 0.75
16 Jawa Timur Surabaya  1,768,777 70,751.08 8,844 0.66 0.81 0.76
17 Bali Denpasar  2,493,523 99,740.92 12,468 0.93 1.15 1.07
18 Kalimantan Barat Pontianak  2,399,698 95,987.92 11,998 0.90 1.10 1.03
19 Kalimantan Tengah Palangkaraya  2,903,144 116,125.76 14,516 1.09 1.34 1.25
20 Kalimantan Selatan Banjarmasin  2,877,447 115,097.88 14,387 1.08 1.32 1.24
21 Kalimantan Timur Samarinda  2,981,378 119,255.12 14,907 1.12 1.37 1.28
22 Kalimantan Utara Tanjung Selor  3,000,803 120,032.12 15,004 1.12 1.38 1.29
23 Sulawesi Utara Manado  3,310,723 132,428.92 16,554 1.24 1.52 1.43
24 Gorontalo Kota Gorontalo  2,586,900 103,476.00 12,935 0.97 1.19 1.11
25 Sulawesi Tengah Palu  2,303,710 92,148.40 11,519 0.86 1.06 0.99
26 Sulawesi Barat Mamuju  2,571,328 102,853.12 12,857 0.96 1.18 1.11
27 Sulawesi Selatan Makassar  3,103,800 124,152.00 15,519 1.16 1.43 1.34
28 Sulawesi Tenggara Kendari  2,552,014 102,080.56 12,760 0.96 1.17 1.10
29 Nusa Tenggara Barat (NTB) Mataram  2,183,883 87,355.32 10,919 0.82 1.01 0.94

343/396
30 Nusa Tenggara Timur (NTT) Kupang  1,945,902 77,836.08 9,730 0.73 0.90 0.84
31 Maluku Utara Sofifi  2,721,530 108,861.20 13,608 1.02 1.25 1.17
32 Maluku Ambon  2,604,960 104,198.40 13,025 0.98 1.20 1.12
33 Papua Barat Manokwari  3,134,600 125,384.00 15,673 1.17 1.44 1.35
34 Papua Jayapura  3,516,700 140,668.00 17,584 1.32 1.62 1.51

344/396
DAFTAR HARGA PERKIRAAN RATA-RATA 5 KOTA BESAR Update : Thn 2020
NO Nama Bahan Satuan Online Price Jakarta Medan Samarinda Makassar Maluku
1 BAHAN ALAM
Batu Bata bh 550 600 600 600 600 700
Batako bh 1,750 1,900 2,000 1,900 1,900 2,200
Kerikil Beton m3 250,000 267,500 275,000 265,000 277,500 305,000
Batu Kali m3 227,500 245,700 241,200 245,700 263,900 304,900
Batu Koral m3 242,000 258,900 268,600 263,800 278,300 295,200
Pasir Beton m3 276,000 295,300 295,300 320,200 311,900 372,600
Pasir Biasa m3 272,000 299,200 293,800 301,900 310,100 340,000
Pasir Urug m3 185,000 194,300 205,400 216,500 194,300 225,700
2 SEMEN
Semen Tiga Roda 50 Kg 64,500 69,700 67,100 72,900 74,200 81,300
Semen Tiga Roda 40 kg 53,000 57,800 59,400 56,700 61,500 71,000
Semen Holcim 50 kg 64,500 69,700 71,000 76,800 73,500 83,900
Semen Holcim 40 kg 52,000 56,200 57,200 55,100 61,900 70,200
Semen Padang 50 kg 61,000 65,300 67,700 72,000 67,100 78,700
Semen Padang 40 kg 50,000 54,500 53,500 54,500 53,500 66,000
Semen Gresik 50 kg 61,000 65,300 67,700 65,300 66,500 77,500
Semen Gresik 40 kg 50,500 55,600 56,100 56,100 54,500 62,100
Semen Putih Semen Putih Tiga Roda 50 kg 80,000 88,000 84,800 88,800 88,800 104,800
Semen Merah Putih 50 kg 60,000 64,800 63,600 71,400 68,400 80,400
Semen Merah Putih 40 kg 50,000 54,000 54,000 55,500 60,000 62,500
Semen Tonasa 50 kg 62,000 68,200 65,100 70,100 65,700 76,300
Semen Bosowa 50 kg 56,000 61,600 58,200 61,000 62,700 76,700
3 BESI BETON
Besi Beton kg 10,000 10,600 11,100 11,600 10,700 13,800
KS CILEGON SNI 8 MM Batang/12m 45,000 48,600 46,800 49,500 54,000 59,400
KS CILEGON SNI 10 MM Batang/12m 70,000 74,900 75,600 79,800 79,100 91,700
KS CILEGON SNI 12 MM Batang/12m 102,000 110,200 108,100 113,200 112,200 127,500
KS CILEGON SNI 13 MM Batang/12m 119,000 127,300 126,100 134,500 134,500 164,200
KS CILEGON SNI 16 MM Batang/12m 180,000 192,600 201,600 205,200 194,400 228,600
KS CILEGON SNI 19 MM Batang/12m 254,000 274,300 281,900 302,300 294,600 332,700
KS CILEGON SNI 22 MM Batang/12m 339,000 366,100 352,600 366,100 393,200 437,300
KS CILEGON SNI 25 MM Batang/12m 440,000 462,000 488,400 497,200 466,400 567,600
KS CILEGON SNI 28 MM Batang/12m 549,000 592,900 609,400 631,400 658,800 658,800
KS CILEGON SNI 32 MM Batang/12m 720,000 792,000 770,400 799,200 813,600 892,800
KS CILEGON SNI 36 MM Batang/12m 915,000 979,100 979,100 1,061,400 960,800 1,152,900

345/396
Besi Beton TARIK 4 mm (3,8 mm) Batang/12m 12,000 12,600 12,700 13,800 13,300 14,400
Besi Beton TARIK 4 mm (4 mm) Batang/12m 13,000 13,700 13,800 14,600 13,700 18,200
Besi Beton TARIK 5 mm (4,2 mm) Batang/12m 14,000 15,100 15,300 16,100 15,800 18,600
Besi Beton TARIK 6 mm (5,2 mm) Batang/12m 19,000 20,000 20,700 22,600 20,900 23,400
Besi Beton TARIK 6 mm (5,6 mm) Batang/12m 22,000 23,300 24,400 24,600 23,500 29,700
Besi Beton TARIK 6 mm (5,8 mm) Batang/12m 23,000 24,400 25,100 25,300 26,900 31,700
Besi Beton 8 SRB SNI (7,1 mm) Batang/12m 34,000 37,100 36,700 40,100 39,800 40,800
Besi Beton 10 SRB SNI (,1 mm) Batang/12m 54,000 57,800 60,500 57,200 63,200 75,100
Besi Beton 12 SRB SNI (11,2 mm) Batang/12m 77,000 80,900 84,700 88,600 85,500 104,700
Besi Beton D 13 SRB SNI (12,2 mm) Batang/12m 97,000 106,700 106,700 114,500 112,500 134,800
Besi Beton D 16 SRB SNI (15,2 mm) Batang/12m 149,000 156,500 156,500 160,900 171,400 199,700
Besi Beton 8 SPI BJKU (7 mm) Batang/12m 32,000 34,900 33,900 34,900 36,200 44,500
Besi Beton 10 SPI BJKU (8,7 mm) Batang/12m 49,000 51,900 52,400 54,400 53,900 59,300
Besi Beton 12 SPI BJKU (10,5 mm) Batang/12m 70,000 75,600 76,300 78,400 84,000 95,200
Besi Beton 8 MSS BJKU (6,2 mm) Batang/12m 27,000 28,400 29,200 30,500 28,400 35,900
Besi Beton 10 MSS BJKU (8 mm) Batang/12m 42,000 45,800 44,900 44,500 47,900 58,000
Besi Beton 12 MSS BJKU (9,5 mm) Batang/12m 57,500 62,700 63,800 61,500 65,600 75,900
Besi Beton 8 TJ SNI (7,5 mm) Batang/12m 36,500 39,400 40,900 41,600 43,800 49,300
Besi Beton 10 TJ SNI (9,5 mm) Batang/12m 57,000 59,900 62,700 63,300 59,900 75,800
Besi Beton 12 TJ SNI (11,5 mm) Batang/12m 81,000 89,100 85,100 87,500 85,100 104,500
Besi Beton D 10 TJ SNI (9,5 mm) Batang/12m 58,500 64,400 60,800 69,600 69,000 74,300
Besi Beton D 13 TJ SNI (12,5 mm) Batang/12m 99,500 109,500 109,500 112,400 106,500 124,400
Besi Beton D 16 TJ SNI (15,5 mm) Batang/12m 150,000 159,000 156,000 159,000 175,500 210,000
Besi Beton D 19 TJ SNI (18,5 mm) Batang/12m 214,000 233,300 235,400 235,400 239,700 293,200
Besi Beton 8 IBD SNI (7,8 mm) Batang/12m 39,000 41,300 41,000 43,700 41,300 52,300
Besi Beton 10 IBD SNI (9,8 mm) Batang/12m 60,000 63,000 67,200 64,200 69,600 83,400
Besi Beton 12 IBD SNI (11,8 mm) Batang/12m 86,000 92,000 92,000 99,800 100,600 110,900
Besi Beton D 13 IBD SNI ( Ulir ) (12,8 mm) Batang/12m 103,000 108,200 112,300 121,500 108,200 141,100
Besi Beton D 16 IBD SNI ( Ulir ) (15,8 mm) Batang/12m 155,000 164,300 167,400 178,300 184,500 201,500
Besi Beton D 19 IBD SNI ( Ulir ) (18,8 mm) Batang/12m 217,000 230,000 234,400 258,200 238,700 266,900
Besi Beton 16 TJ SNI ( Polos ) (15,5 mm) Batang/12m 148,000 158,400 159,800 173,200 159,800 179,100
4 KAYU K1 (K2=75%Price, K3=60%Price)
Kayu Meranti Ukuran 2 x 3 m3 3,125,000 3,437,500 3,375,000 3,656,300 3,750,000 4,218,800
Kayu Meranti Ukuran 3 x 4 m3 3,281,250 3,609,400 3,576,600 3,740,600 3,609,400 4,331,300
Kayu Meranti Ukuran 4 x 6 m3 2,812,500 3,065,600 3,150,000 3,150,000 3,037,500 3,375,000
Kayu Meranti Ukuran 5 x 7 m3 3,000,000 3,270,000 3,120,000 3,540,000 3,300,000 3,930,000
Kayu Meranti Ukuran 5 x 10 m3 3,500,000 3,745,000 3,885,000 4,130,000 4,130,000 4,795,000
Kayu Meranti Ukuran 6 x 12 m3 3,263,889 3,525,000 3,394,400 3,720,800 3,525,000 4,014,600

346/396
Kayu Meranti Ukuran 8 x 12 m3 3,385,417 3,690,100 3,554,700 3,656,300 3,927,100 4,468,800
Kayu Kamper Ukuran 4 x 6 m3 5,208,333 5,677,100 5,781,300 6,197,900 5,677,100 6,302,100
Kayu Kamper Ukuran 5 x 7 m3 6,071,429 6,435,700 6,314,300 7,042,900 6,496,400 8,196,400
Kayu Kamper Ukuran 5 x 10 m3 6,000,000 6,480,000 6,600,000 6,420,000 6,960,000 8,040,000
Kayu Borneo Ukuran 2 x 3 m3 2,708,333 2,925,000 3,006,300 2,979,200 2,979,200 3,412,500
Kayu Borneo Ukuran 3 x 4 m3 3,125,000 3,281,300 3,468,800 3,656,300 3,375,000 4,093,800
5 GYPSUM DAN GRC
Jayaboard 9mm (1.20×2.40) Lembar 63,000 66,200 66,200 68,700 69,300 83,200
Elephant 9mm (1.20×2.40) Lembar 61,000 67,100 67,100 72,600 65,300 75,000
Knauf 9mm (1.20×2.40) Lembar 60,000 65,400 64,800 69,600 64,200 80,400
Star 9mm (1.20×2.40) Lembar 59,000 64,900 65,500 63,100 67,300 78,500
Aplus 9mm (1.20×2.40) Lembar 58,000 62,600 63,200 67,300 68,400 80,600
5 ATAP METAL ROOF
Genteng Metal Batuan 2×4 T.0.25*-77cm x 80Cm Lembar 35,000 37,500 39,200 37,100 37,500 48,300
Inti Roof 2×4 T.0.3-77cm x 80Cm Lembar 60,000 66,000 67,200 71,400 68,400 82,200
Inti Roof 1×4 T.0.25-38.5 Cm x 80 Cm Lembar 29,500 32,200 33,000 31,900 33,300 35,700
Inti Roof 2×4 T.0.25-77cm x 80Cm Lembar 58,000 62,600 65,000 65,500 66,700 77,100
Inti Roof 1×4 T.0.30-38.5 Cm x 80 Cm Lembar 30,000 32,400 31,500 33,600 31,500 38,700
Inti Roof 1×4 T.0.35-38.5 Cm x 80 Cm (diluar 0.4) Lembar 36,000 39,600 38,500 39,200 42,100 43,900
Inti Roof 2×4 T.0.35 *-77cm x 80Cm Lembar 67,000 72,400 73,000 73,000 79,100 87,800
Multiroof 1×5-38.5 Cm x 1m (diluar 0.4) Lembar 63,000 69,300 70,600 72,500 68,700 80,600
Multiroof 2×5-77 Cm x 1M  (diluar 0.4) Lembar 98,000 102,900 106,800 116,600 102,900 136,200
Multiroof Batuan 2×5-77 Cm x 1M  (diluar 0.4) Lembar 120,000 129,600 133,200 135,600 139,200 146,400
Sakura 2×4 T.0.25-77cm x 80Cm Lembar 37,000 39,200 40,300 40,700 40,000 46,300
Soka Batuan 2×4 T.0.25-740 Cm x 80 Cm Lembar 57,000 62,700 63,800 64,400 62,700 77,000
Super Batuan 1×4 T.0.25-38.5 Cm x 80 Cm Lembar 24,000 26,200 26,200 27,800 27,400 32,200
Super Batuan 2×4 T.0.25-77cm x 80Cm Lembar 46,000 48,300 48,300 52,400 48,800 61,200
Surya 2×4 T.0.30-77cm x 80Cm Lembar 70,000 77,000 74,900 76,300 74,900 93,100
Surya 1×4 T.0.3-38.5 Cm x 80 Cm Lembar 37,000 40,000 41,100 44,000 42,200 45,100
6 METAL SPANDEK
Zincalume 0,3 mm m1 49,650 52,100 53,100 53,600 54,100 59,600
Zincalume 0,35 mm m1 59,650 65,000 64,400 67,400 69,800 78,100
Zincalume 0,4 mm m1 74,650 82,100 82,100 82,100 83,600 100,800
Zincalume 0,45 mm m1 79,650 87,600 86,800 86,800 94,800 97,200
Zincalume 0,5 mm m1 88,650 94,000 94,900 94,900 101,100 121,500
Spandek 0.25 m1 35,650 38,900 37,400 41,700 38,900 43,100
Spandek 0.30 m1 45,650 48,400 48,400 49,800 50,200 56,600
Spandek 0.35 m1 65,650 68,900 72,200 75,500 69,600 88,600

347/396
Spandek 0.40 m1 70,650 74,900 76,300 82,000 84,100 98,900
Spandek 0.45 m1 80,650 88,700 85,500 89,500 96,000 106,500
Spandek 0.50 m1 90,650 96,100 98,800 103,300 106,100 116,900
7 CAT ANTI BOCOR DAN WATERPROOFING
No Drop Mocha 20 kg 817,000 874,200 849,700 866,000 923,200 1,070,300
No Drop Warna Kuning 1 kg 50,000 54,000 53,500 59,500 55,000 63,500
No Drop Abu Abu Muda 4 kg 184,000 202,400 202,400 200,600 196,900 233,700
No Drop Warna Gun Metal 20 kg 823,000 864,200 921,800 872,400 962,900 1,127,500
No Drop Warna Putih 1 kg 50,000 53,500 52,000 59,000 60,000 61,500
No Drop Kaleng 4Kg Putih 4 kg 184,000 196,900 204,200 196,900 200,600 224,500
No Drop Warna Hitam 1 kg 48,000 52,300 49,900 52,800 55,700 57,600
Aqua Proof 1 K 1 kg 52,000 54,600 57,700 55,100 56,200 72,800
Aqua Proof 4 K 5 kg 179,000 189,700 191,500 191,500 213,000 216,600
Aqua Proof 20 K 1 pail 806,000 854,400 878,500 862,400 918,800 1,112,300
Aqua Heat Gard 4 K 5 kg 247,000 271,700 266,800 261,800 289,000 335,900
Aquaproof Kaleng Abu Muda 1 kg 51,000 55,100 53,000 57,600 59,700 65,800
Aquaproof Kaleng Transparan 5 kg 49,000 53,900 51,000 57,300 58,300 68,100
Aquaproof Kaleng Grey 1 pail 48,000 52,800 52,800 50,900 52,800 66,700
Aquaguard Semen Anti Air 2 M2 71,000 78,100 78,800 80,900 75,300 89,500
Aqua Heat Gard 20 P 1 pail 920,000 993,600 975,200 1,030,400 1,012,000 1,242,000
8 ATAP ASBES
Atap Asbes Ukuran 150 x 105 Lembar 45,500 47,800 49,600 50,100 49,600 57,800
Atap Asbes Ukuran 180 x 105 Lembar 50,500 55,600 53,000 57,100 54,000 69,200
Atap Asbes Ukuran 210 x 105 Lembar 61,000 65,900 64,100 71,400 66,500 73,200
Atap Asbes Ukuran 240 x 105 Lembar 64,000 67,800 67,800 69,800 67,200 83,800
Atap Asbes Ukuran 270 x 105 Lembar 75,000 82,500 78,800 87,800 87,800 90,800
Atap Asbes Ukuran 300 x 105 Lembar 86,000 92,000 91,200 97,200 92,000 115,200
9 BAHAN KERAMIK LANTAI & DINDING
KERAMIK LANTAI ROMAN
Keramik Roman 20 x 20 Golongan A m2(25/dos) 87,000 94,800 94,000 102,700 92,200 105,300
Keramik Roman 20 x 20 Golongan B m2(25/dos) 90,000 99,000 95,400 102,600 104,400 121,500
Keramik Roman 20 x 20 Golongan D m2(20/dos) 100,000 107,000 105,000 111,000 118,000 126,000
Keramik Roman 30 x 30 Golongan B m2(11/dos) 87,000 94,000 96,600 98,300 103,500 113,100
Keramik Roman 30 x 30 Golongan C m2(11/dos) 91,000 96,500 100,100 101,900 99,200 116,500
Keramik Roman 33.3 x 33.3 Golongan A m2(9/dos) 97,000 105,700 104,800 105,700 103,800 119,300
Keramik Roman 33.3 x 33.3 Golongan C m2(9/dos) 137,500 149,900 147,100 145,800 165,000 187,000
Keramik Roman 40 x 40 Golongan A m2(6/dos) 97,000 102,800 107,700 103,800 101,900 121,300
Keramik Roman 40 x 40 Golongan B m2(6/dos) 105,000 112,400 109,200 117,600 123,900 140,700

348/396
Keramik Roman 40 x 40 Golongan C m2(6/dos) 107,000 117,700 113,400 118,800 117,700 139,100
Keramik Roman 40 x 40 Golongan D m2(6/dos) 112,000 117,600 125,400 121,000 134,400 150,100
Keramik Roman 45 x 45 Golongan A m2(5/dos) 107,000 112,400 114,500 126,300 124,100 143,400
Keramik Roman 45 x 45 Golongan B m2(5/dos) 113,000 124,300 117,500 132,200 127,700 146,900
Keramik Roman 45 x 45 Golongan E m2(5/dos) 150,000 163,500 166,500 168,000 157,500 184,500
Keramik Roman 50 x 50 Golongan A m2(4/dos) 123,500 129,700 135,900 137,100 129,700 169,200
Keramik Roman 50 x 50 Golongan B m2(4/dos) 132,500 140,500 137,800 151,100 156,400 164,300
Keramik Roman 50 x 50 Golongan C m2(4/dos) 150,500 161,000 165,600 164,000 159,500 191,100
Keramik Roman 60 x 60 Golongan A m2(3/dos) 155,000 169,000 165,900 184,500 167,400 190,700
Keramik Roman 60 x 60 Golongan B m2(3/dos) 175,000 190,800 182,000 206,500 201,300 220,500
Keramik Roman 60 x 60 Golongan C m2(3/dos) 200,000 216,000 220,000 238,000 226,000 258,000
Keramik Roman 16.5 x 66.6 Golongan A m2(10/dos) 192,000 211,200 207,400 215,000 226,600 251,500
Keramik Roman 33.3 x 66.6 Golongan A m2(5/dos) 172,500 188,000 188,000 186,300 188,000 236,300
Keramik Roman 33.3 x 66.6 Golongan B m2(5/dos) 193,000 210,400 204,600 225,800 229,700 262,500
Keramik Roman 33.3 x 66.6 Golongan C m2(5/dos) 212,500 227,400 238,000 248,600 252,900 255,000
Keramik Roman 8 x 30 Hospital Skirting m2(30/dos) 474,000 516,700 516,700 526,100 554,600 644,600
Keramik Roman 10 x 20 Step Nosing m2(50/dos) 515,000 545,900 535,600 597,400 612,900 648,900
KERAMIK DINDING ROMAN
Keramik 20 x 20 Golongan A m2(25/dos) 84,000 89,000 91,600 94,100 98,300 117,600
Keramik Roman 20 x 20 Golongan B m2(25/dos) 90,000 97,200 97,200 99,900 107,100 119,700
Keramik Roman 20 x 25 Golongan A m2(20/dos) 84,000 91,600 89,000 91,600 91,600 103,300
Keramik Roman 20 x 25 Golongan B m2(20/dos) 90,000 99,000 93,600 99,000 103,500 116,100
Keramik Roman 20 x 25 Golongan C m2(20/dos) 93,500 101,000 101,900 105,700 99,100 126,200
Keramik Roman 25 x 25 Golongan A m2(16/dos) 85,000 93,500 94,400 93,500 102,000 106,300
Keramik Roman 25 x 25 Golongan B m2(16/dos) 91,500 98,800 101,600 100,700 104,300 111,600
Keramik Roman 25 x 25 Golongan C m2(16/dos) 103,000 109,200 115,400 122,600 108,200 124,600
Keramik Roman 30 x 30 Golongan B (match 20 x 60) m2(11/dos) 118,000 129,800 126,300 135,700 125,100 142,800
Keramik Roman 30 x 30 Golongan C (match 20 x 60) m2(11/dos) 128,000 135,700 138,200 147,200 134,400 166,400
Keramik Roman 30 x 30 Golongan D (match 20 x 60) m2(11/dos) 143,000 151,600 158,700 158,700 150,200 194,500
Keramik Roman 30 x 30 Golongan A (match 30 x 60) m2(11/dos) 113,000 123,200 117,500 128,800 120,900 144,600
Keramik Roman 30 x 30 Golongan B (match 30 x 60) m2(11/dos) 118,000 126,300 127,400 127,400 141,600 165,200
Keramik Roman 30 x 30 Golongan C (match 30 x 60) m2(11/dos) 128,000 134,400 137,000 144,600 151,000 174,100
Keramik Roman 30 x 30 Golongan D (match 30 x 60) m2(11/dos) 143,000 155,900 153,000 164,500 164,500 185,900
Keramik Roman 25 x 33.3 Golongan A m2(12/dos) 84,000 92,400 89,000 97,400 100,800 102,500
Keramik Roman 25 x 33.3 Golongan B m2(12/dos) 90,000 96,300 98,100 95,400 103,500 113,400
Keramik Roman 25 x 33.3 Golongan C m2(12/dos) 93,500 98,200 104,700 101,000 111,300 115,900
Keramik Roman 20 x 40 Golongan A m2(12/dos) 84,000 89,900 89,000 92,400 94,100 115,900
Keramik Roman 20 x 40 Golongan B m2(12/dos) 90,000 96,300 98,100 102,600 107,100 123,300

349/396
Keramik Roman 25 x 45 Golongan A m2(9/dos) 92,500 99,000 103,600 100,800 107,300 111,000
Keramik Roman 25 x 45 Golongan B m2(9/dos) 103,500 108,700 115,900 112,800 114,900 138,700
Keramik Roman 25 x 45 Golongan D m2(9/dos) 122,500 133,500 129,900 137,200 142,100 150,700
Keramik Roman 32.5 x 32.5 Golongan A match 32.5 x 65.6 m2(9/dos) 126,000 137,300 137,300 133,600 132,300 176,400
Keramik Roman 32.5 x 32.5 Golongan B match 32.5 x 65.6 m2(9/dos) 131,000 137,600 142,800 150,700 157,200 163,800
Keramik Roman 32.5 x 32.5 Golongan A match 32.5 x 97.5 m2(9/dos) 126,000 136,100 132,300 136,100 144,900 171,400
Keramik Roman 20 x 60 Golongan A m2(8/dos) 128,500 134,900 143,900 150,300 150,300 173,500
Keramik Roman 20 x 60 Golongan B m2(8/dos) 140,000 149,800 149,800 151,200 162,400 187,600
Keramik Roman 20 x 60 Golongan C m2(8/dos) 155,000 167,400 173,600 167,400 169,000 187,600
Keramik Roman 20 x 60 Golongan D m2(8/dos) 175,000 183,800 187,300 194,300 203,000 227,500
Keramik Roman 30 x 60 Golongan A m2(6/dos) 128,500 138,800 137,500 147,800 140,100 174,800
Keramik Roman 30 x 60 Golongan B m2(6/dos) 140,000 147,000 155,400 149,800 154,000 175,000
Keramik Roman 30 x 60 Golongan C m2(6/dos) 155,000 169,000 161,200 172,100 181,400 206,200
Keramik Roman 30 x 60 Golongan D m2(6/dos) 175,000 183,800 192,500 204,800 187,300 231,000
Keramik Roman 30 x 60 Golongan E m2(6/dos) 185,000 194,300 199,800 201,700 216,500 222,000
Keramik Roman 32.5 x 65.6 Golongan A Rectified m2(5/dos) 191,500 208,700 212,600 224,100 222,100 229,800
Keramik Roman 32.5 x 65.6 Golongan B Rectified m2(5/dos) 207,000 225,600 221,500 229,800 229,800 256,700
Keramik Roman 32.5 x 65.6 Golongan C Rectified m2(5/dos) 226,000 246,300 248,600 248,600 244,100 307,400
Keramik Roman 32.5 x 97.5 Golongan A Rectified m2(5/dos) 283,000 302,800 294,300 328,300 314,100 356,600
Keramik Roman 32.5 x 97.5 Golongan B Rectified m2(5/dos) 323,000 345,600 361,800 358,500 377,900 429,600
KERAMIK GRANITO 60x60 - - - - -
Keramik 220 – Ivory dan 280 Joyce m2 175,000 185,500 190,800 189,000 204,800 215,300
Keramik 242 – Sara m2 200,000 210,000 220,000 220,000 232,000 246,000
Keramik 240 – White m2 200,000 210,000 210,000 216,000 216,000 270,000
Keramik 989 – Granite Black m2 240,000 264,000 254,400 283,200 278,400 312,000
KERAMIK LAINNYA
PLATINUM 20x20 Galaxy Black, Brown, Cream, Grey, White m2 (25/dos) 38,500 40,400 41,600 42,400 43,500 53,900
PLATINUM 20x20 Petra Cream, Terracota KW- A m2(25/dos) 38,500 42,400 42,700 44,300 42,400 49,700
PLATINUM 20x20 Roxy black, Blue, Brown, Green, Grey, Re m2(25/dos) 38,500 42,000 41,600 41,200 42,400 47,000
PLATINUM 20x20 Alpha Blue, Green KW- A m2(25/dos) 40,000 43,200 44,400 43,200 46,400 53,200
PLATINUM 20x20 Track Brown, Grey KW- A m2(25/dos) 42,500 45,100 45,900 48,000 47,600 53,100
PLATINUM 30x30 Jungle Red, Green, Grey, Red KW- A m2(11/dos) 35,500 37,600 39,800 42,200 39,400 49,700
PLATINUM 30x30 Capri Brown, Grey KW- A m2(11/dos) 36,000 39,600 38,900 38,200 42,100 45,000
PLATINUM 30x30 Marble Brown KW- A m2(11/dos) 37,000 39,600 41,100 40,300 39,200 51,400
PLATINUM 30x30 Newton Brown, Green, Grey KW- A m2(11/dos) 37,000 40,700 38,500 41,400 40,700 46,300
PLATINUM 30x30 Mahoni Brown, Cream KW- A m2(11/dos) 38,000 41,800 39,900 42,600 40,300 47,100
PLATINUM 30x30 Cargo, Brown, Grey, dark Brown, dark Gr m2(11/dos) 45,000 48,600 48,600 53,600 52,200 54,500
PLATINUM 30x30 Clarin, Bone, Brown, Grey KW- A m2(11/dos) 45,000 47,700 47,700 52,200 48,200 57,200

350/396
PLATINUM 30x30 Cordon, Bone, Brown, Cream KW- A m2(11/dos) 45,000 48,200 47,700 50,000 50,900 59,900
PLATINUM 30x30 Bintan, Bone, Brown, Cream KW- A m2(11/dos) 46,500 48,800 51,600 51,600 52,100 62,300
PLATINUM 60x60 Cavalli, Cream, White KW- A m2(4/dos) 81,500 86,400 84,800 92,100 91,300 98,600
PLATINUM 60x60 FRedo, Cream, Grey KW- A m2(4/dos) 81,500 86,400 86,400 91,300 93,700 114,100
PLATINUM 60x60 Fresno, Cream, Grey KW- A m2(4/dos) 81,500 87,200 89,700 94,500 94,500 97,800
PLATINUM 60x60 Salsa, Cream, Grey KW- A m2(4/dos) 81,500 86,400 86,400 86,400 91,300 112,500
PLATINUM 60x60 Sicillia, Grey KW- A m2(4/dos) 81,500 86,400 90,500 86,400 88,000 107,600
PLATINUM 60x60 Sonata, Brown KW- A m2(4/dos) 81,500 86,400 91,300 94,500 86,400 100,200
PLATINUM 60x60 Strata, Cream, Grey KW- A m2(4/dos) 81,500 86,400 86,400 86,400 86,400 106,000
PLATINUM 60x60 Tequila, Cream, White KW- A m2(4/dos) 81,500 88,800 86,400 93,700 92,100 106,000
PLATINUM 60x60 Tosca, Cream, White KW- A m2(4/dos) 81,500 86,400 91,300 97,000 88,000 97,800
PLATINUM 60x60 Tudor, Cream, White KW- A m2(4/dos) 81,500 86,400 90,500 97,000 96,200 102,700
PLATINUM 60x60 Teakwood, Beige, Brown, Latte KW- A m2(4/dos) 81,500 85,600 89,700 90,500 88,800 98,600
ARWANA Warna Tua 20 x 20 m2 36,500 40,200 38,000 42,000 39,400 46,000
ARWANA Warna Muda 20 x 20 m2 36,000 38,900 40,000 40,000 42,100 43,600
ARWANA Warna Putih 30 x 30 m2 30,500 33,200 34,200 34,800 35,700 39,700
ARWANA Warna Marble 30 x 30 m2 35,000 37,500 37,500 38,200 41,300 45,900
ARWANA Warna Fancy 30 x 30 m2 39,500 42,700 44,200 45,000 42,700 54,900
ARWANA Warna Putih 40 x 40 m2 36,500 39,100 40,200 39,100 40,900 45,600
ARWANA Warna Marble 40 x 40 m2 42,000 44,500 47,000 45,400 47,000 58,400
MULIA Warna Tua 20 x 20 m2 38,000 41,400 41,000 42,900 42,900 51,300
MULIA Warna Muda 20 x 20 m2 35,500 38,300 39,400 40,800 37,600 47,600
MULIA Warna Putih 30 x 30 m2 32,000 33,900 34,900 34,900 37,100 41,300
MULIA Warna Marble 30 x 30 m2 37,500 40,900 40,500 44,300 44,300 51,800
MULIA Warna Impresso 30 x 30 m2 40,500 42,900 42,900 43,300 47,800 55,500
MILAN Pure Color 50 x 50 m2 93,500 100,000 101,900 104,700 99,100 118,700
MILAN Classy Color 50 x 50 m2 102,000 109,100 108,100 120,400 114,200 139,700
MILAN Fancy Color 50 x 50 m2 112,000 119,800 119,800 125,400 127,700 137,800
MILAN Accent Color 50 x 50 m2 185,000 201,700 205,400 205,400 203,500 257,200
MILAN Pure Color 25 x 50 m2 79,000 83,700 86,900 89,300 94,800 105,100
MILAN Classy Color 25 x 50 m2 85,500 94,100 95,800 99,200 90,600 107,700
MILAN Fancy Color 25 x 50 m2 97,000 102,800 104,800 108,600 113,500 132,900
MILAN Accent Color 25 x 50 m2 170,000 178,500 190,400 195,500 185,300 214,200
MILAN Pure Color 25 x 25 m2 72,000 77,000 79,200 77,000 80,600 99,400
MILAN Classy Color 25 x 25 m2 78,000 81,900 84,200 88,100 92,000 103,700
MILAN Fancy Color 25 x 25 m2 92,000 97,500 99,400 104,000 103,000 127,900
MILAN Accent Color 25 x 25 m2 162,000 170,100 178,200 187,900 184,700 196,000
MILAN Putih 40 x 40 m2 49,500 53,000 54,000 53,000 58,400 64,400

351/396
MILAN Median 40 x 40 m2 51,000 56,100 56,100 60,200 57,100 64,800
MILAN Gelap 40 x 40 m2 52,500 55,700 56,700 57,800 60,900 73,500
MILAN Rustic 33 x 33 m2 44,000 48,000 48,800 52,400 46,600 53,700
MILAN Rustic 40 x 40 m2 45,500 48,700 48,200 49,100 54,600 62,800
MILAN Supermilan 25 x 33 – Golongan A m2 56,000 59,900 59,400 66,600 66,100 71,100
MILAN Supermilan 25 x 33 – Golongan B m2 57,500 62,700 61,000 62,100 62,700 75,300
MILAN Supermilan 40 x 40 – Putih m2 49,000 51,900 51,000 57,300 57,300 61,300
MILAN Supermilan 40 x 40 – Median m2 53,000 56,200 57,800 59,400 62,500 70,500
MILAN Supermilan 40 x 40 – Gelap m2 54,000 56,700 59,900 57,200 61,000 71,800
MILAN Supermilan 50 x 50 – Putih m2 72,000 77,800 80,600 82,800 82,100 100,100
Hercules – Gelap 40 x 40 m2 47,500 52,300 49,400 56,100 55,100 66,500
Hercules – Motif Khusus 40 x 40 m2 42,000 45,800 44,900 45,400 50,400 53,300
Hercules – Putih 40 x 40 m2 38,500 40,800 43,100 41,200 43,500 50,400
Hercules – Motif Dasar Putih 40 x 40 m2 44,500 48,100 48,500 49,400 50,300 54,700
Hercules – Motif Dasar Gelap 40 x 40 m2 45,500 47,800 51,000 53,200 50,500 56,000
10 KLOSET JONGKOK & KLOSET DUDUK - - - - -
Kloset Jongkok INA Unit 145,000 152,300 162,400 166,800 152,300 185,600
Kloset Jongkok TOTO Unit 185,000 199,800 199,800 205,400 203,500 257,200
Kloset Jongkok DUTY Unit 155,000 165,900 172,100 167,400 165,900 187,600
Closet American Standard –   ACACIA – CAA4YPC10 Unit 6,200,000 6,510,000 6,696,000 7,006,000 6,510,000 7,750,000
Closet American Standard –   ACACIA – HAA4YQC10 Unit 5,900,000 6,372,000 6,254,000 6,313,000 6,962,000 7,257,000
Closet American Standard –   IMAGINE – CA01YPC10 Unit 5,750,000 6,267,500 6,440,000 6,727,500 6,727,500 6,957,500
Closet American Standard –   IMAGINE – HA01YNC10 Unit 6,550,000 7,205,000 7,139,500 7,139,500 7,467,000 8,384,000
Closet American Standard –   MOMENTS HAM9YNC10 Unit 6,250,000 6,562,500 6,500,000 7,187,500 6,812,500 8,562,500
WC Duduk Toto C436 Unit 7,220,000 7,725,400 7,725,400 7,942,000 8,375,200 8,952,800
WC Duduk Toto C704L/SW784JP Unit 3,070,000 3,346,300 3,407,700 3,499,800 3,591,900 3,898,900
WC Duduk Toto CES9683AJ Unit 5,320,000 5,639,200 5,958,400 6,277,600 6,384,000 6,703,200
WC Duduk Toto CES9911B Unit 6,920,000 7,335,200 7,681,200 7,819,600 8,304,000 9,549,600
WC Duduk Toto CW421J/SW420JP Unit 2,160,000 2,332,800 2,376,000 2,505,600 2,289,600 2,592,000
WC Duduk Toto CW620J Unit 4,950,000 5,445,000 5,494,500 5,692,500 5,890,500 6,138,000
11 BAJA RINGAN - - - - -
Truss C75.60 SNI BMT * btg/4m 57,000 61,600 63,300 65,600 61,000 70,100
Truss C75.70 SNI BMT btg/4m 62,000 67,600 66,300 68,200 68,200 74,400
Truss C75.75 SNI BMT btg/4m 65,000 68,300 70,900 71,500 76,700 78,700
Truss C75.75 SNI ALFA btg/4m 65,000 70,900 72,200 72,200 68,900 87,800
Truss C75.65 SNI ALFA btg/4m 60,000 63,000 65,400 69,000 64,800 79,200
Truss C75.75 SNI TASO btg/4m 80,000 88,000 85,600 92,000 88,000 102,400
Truss C75.75 SNI Tangguh btg/4m 76,000 83,600 82,100 80,600 90,400 104,100

352/396
Truss C75.100 SNI btg/4m 96,000 104,600 103,700 111,400 103,700 133,400
Truss C75.100 SNI btg/4m 96,000 105,600 106,600 111,400 105,600 131,500
Truss C75.100 CBM btg/4m 105,000 115,500 109,200 120,800 110,300 132,300
Truss C75.100 SNI TASO * btg/4m 125,000 136,300 131,300 141,300 140,000 165,000
Truss C75.80 SNI TASO btg/4m 90,000 96,300 95,400 107,100 96,300 125,100
Truss C75.75 SNI HS ** btg/4m 62,000 66,300 68,200 70,100 69,400 84,900
Reng 28.45 * btg/4m 29,000 30,700 31,300 30,700 32,200 39,400
Reng 30.45 BMT btg/4m 32,000 33,600 34,900 33,900 38,400 43,200
Reng 30.45 Yume * btg/4m 32,000 35,200 33,600 37,100 33,600 40,000
Reng 31.45 Alfa btg/4m 33,000 35,600 35,300 37,000 39,300 40,900
Reng 32.45 TASO btg/4m 40,000 44,000 43,200 46,000 42,000 52,400
12 CAT DAN LABURAN - - - - -
Cat Tembok Vinilex Super 5 kg 132,000 138,600 141,200 145,200 145,200 163,700
Cat Tembok Vinilex Super 25 kg 765,000 833,900 856,800 887,400 849,200 1,055,700
Aquaproof 5 kg 170,000 185,300 180,200 180,200 204,000 236,300
Aquaproof 25 kg 675,000 735,800 742,500 796,500 776,300 924,800
Cat DULUX (ICI) dan Cat CATYLAC (ICI) - - - - -
Pentalite warna standar 2,5 liter 134,000 147,400 144,700 148,700 140,700 180,900
Weathershield Pro Exterior warna standar 2,5 liter 205,000 223,500 219,400 221,400 229,600 268,600
Pearl Glo warna standar 2,5 liter 185,000 194,300 192,400 220,200 218,300 259,000
Catylac 5 kg 90,000 99,000 95,400 100,800 101,700 113,400
Catylac 25 kg 460,000 483,000 483,000 496,800 542,800 630,200
Cat NIPPON PAINT - - - - -
Vinilex 1 kg 32,000 34,200 33,900 36,200 38,400 41,300
Vinilex 5 kg 93,000 100,400 103,200 100,400 111,600 126,500
Matex Gold 5 kg 97,000 103,800 103,800 114,500 104,800 124,200
Vinilex Fresh 2,5 liter 172,000 187,500 182,300 185,800 192,600 208,100
Satin Glo 2,5 liter 172,000 182,300 187,500 203,000 190,900 232,200
Vinilex 25 kg 448,000 488,300 479,400 474,900 528,600 618,200
Nippon Spot-Less 2,5 liter 146,000 160,600 163,500 159,100 172,300 175,200
Nippon Weatherbond 2,5 liter 178,000 186,900 199,400 194,000 211,800 240,300
Nippon Odour-Less 2,5 liter 218,000 231,100 237,600 242,000 259,400 281,200
Nippon 3 in 1 2,5 liter 193,000 206,500 200,700 212,300 206,500 266,300
Cat AVITEX, NO ODOR, Q-LUC - - - - -
Avitex 5 kg 73,000 76,700 79,600 78,100 83,200 100,700
No Odor 5 kg 103,000 112,300 107,100 116,400 115,400 139,100
No Odor 20 kg 488,000 512,400 541,700 522,200 551,400 644,200
Q-Luc 5 kg 51,000 53,600 56,600 59,700 61,200 62,700

353/396
Q-Luc 20 kg 193,000 210,400 216,200 216,200 220,000 239,300
Cat FALCON - - - - -
Falcon 1 kg 16,500 17,300 17,700 19,300 17,700 22,100
Falcon 5 kg 58,000 61,500 60,900 65,000 69,000 81,200
Falcon 25 kg 293,500 322,900 317,000 311,100 328,700 402,100
Yhing Stex 5 kg 35,500 37,600 39,100 38,000 38,000 46,900
Yhing Stex 25 kg 172,500 184,600 191,500 193,200 193,200 213,900
Cat METROLITE - - - - -
Metrolite 1 kg 26,000 28,100 27,600 28,100 27,600 33,800
Metrolite 3 liter 78,000 84,200 81,100 84,200 85,800 108,400
Metrolite 16 liter 385,000 408,100 427,400 438,900 419,700 523,600
Metrolite 1 kg 26,000 28,300 28,600 29,400 29,100 34,800
Metrolite 3 liter 78,000 84,200 85,000 91,300 85,000 98,300
Cat DECORSHIELD (Eksterior) - - - - -
Decorshield warna standar 2,5 liter 210,000 222,600 228,900 233,100 237,300 270,900
Decorshield warna standar 20 liter 1,600,000 1,760,000 1,792,000 1,728,000 1,856,000 2,224,000
Decorshield warna special 2,5 liter 220,500 240,300 244,800 233,700 258,000 275,600
Decorshield warna special 20 liter 1,602 1,800 1,700 1,700 1,700 2,100
Cat DECORSHIELD (Interior) - - - - -
Decorcryl warna standar 2,5 liter 135,000 141,800 140,400 153,900 158,000 176,900
Decorcryl warna standar 20 liter 945,000 1,020,600 1,030,100 1,096,200 1,096,200 1,238,000
Decorcryl warna special 1 2,5 liter 155,000 169,000 162,800 178,300 164,300 187,600
Decorcryl warna special 1 20 liter 1,100,000 1,210,000 1,144,000 1,232,000 1,232,000 1,485,000
Decorcryl warna special 2 2,5 liter 180,000 194,400 201,600 212,400 210,600 241,200
Decorcryl warna special 2 20 liter 1,400,000 1,540,000 1,470,000 1,666,000 1,498,000 1,750,000
Cat MOWILEX - - - - -
Cendana warna standar 5 kg 90,000 98,100 93,600 105,300 100,800 110,700
Cendana warna standar 25 kg 442,500 469,100 477,900 504,500 491,200 539,900
Mowilex 1 liter 58,000 60,900 63,200 62,100 69,000 78,300
Mowilex 2,5 liter 122,500 129,900 136,000 133,500 129,900 169,100
Mowilex 20 liter 895,000 957,700 939,800 1,038,200 939,800 1,118,800
Cat KEMTONE - - - - -
Kemtone Alkali Resisting Primer (utk luar) 3,78 liter 228,000 239,400 241,700 248,500 246,200 298,700
Kemtone Alkali Resisting Primer (utk luar) 18,9 liter 1,055 1,100 1,200 1,200 1,200 1,500
Kemtone 3 in 1 Alkali Primer (solvent base) 3,70 liter 235,000 246,800 244,400 265,600 270,300 305,500
Kemtone 3 in 1 Alkali Primer (solvent base) 18,9 liter 1,200,000 1,320,000 1,308,000 1,272,000 1,332,000 1,476,000
Kemtone Interior satin warna putih 800 3,78 liter 197,000 210,800 206,900 234,400 232,500 256,100
Kemtone Interior satin warna putih 800 18,9 liter 947,500 1,042,300 1,032,800 1,127,500 1,023,300 1,174,900

354/396
Kemtone Interior satin warna muda 3,78 liter 205,000 219,400 229,600 244,000 246,000 264,500
Kemtone Interior satin warna muda 18,9 liter 970,000 1,057,300 1,028,200 1,047,600 1,037,900 1,193,100
Kemtone Interior satin warna special/tua 0,94 liter 69,000 73,100 71,800 76,600 77,300 86,900
Kemtone Interior satin warna special/tua 3,78 liter 245,000 262,200 274,400 274,400 259,700 308,700
Kemtone Interior satin warna special/tua 18,9 liter 1,200,000 1,260,000 1,272,000 1,380,000 1,428,000 1,644,000
Kemtone Interior flat warna muda 3,78 liter 205,000 219,400 225,500 244,000 237,800 274,700
Kemtone Interior flat warna muda 18,9 liter 965,000 1,032,600 1,071,200 1,061,500 1,071,200 1,225,600
Kemtone Interior flat warna tua 3,78 liter 245,000 257,300 269,500 276,900 267,100 323,400
Kemtone Interior flat warna tua 18,9 liter 1,200,000 1,284,000 1,320,000 1,344,000 1,428,000 1,488,000
Cat SPECTRUM (KEMTONE) - - - - -
Spectrum Alkali Resisting Primer 3,78 liter 92,500 97,100 97,100 107,300 99,900 123,000
Spectrum Alkali Resisting Primer 18,9 liter 460,000 483,000 515,200 496,800 542,800 579,600
Spectrum Plafond & Gypsum 3,70 liter 90,000 94,500 99,900 106,200 96,300 119,700
Spectrum Plafond & Gypsum 18,9 liter 442,500 469,100 486,800 522,200 469,100 584,100
Spectrum Tintink Colors warna standar 0,94 liter 35,000 37,100 39,200 41,300 41,000 48,300
Spectrum Tintink Colors warna standar 3,70 liter 105,000 111,300 109,200 116,600 119,700 140,700
Spectrum Tintink Colors warna standar 18,9 liter 510,000 535,500 571,200 606,900 606,900 637,500
Spectrum Tintink Colors warna tua 0,94 liter 41,000 43,100 45,500 44,300 46,700 55,800
Spectrum Tintink Colors warna tua 3,70 liter 125,000 136,300 130,000 145,000 136,300 167,500
Spectrum Tintink Colors warna tua 18,9 liter 605,000 641,300 635,300 689,700 653,400 847,000
Cat Merk JOTUN - - - - -
Jotun Majestic Optima Putih 2,5 liter 185,000 203,500 207,200 203,500 198,000 244,200
Jotun Majestic Optima Standar 2,5 liter 185,000 196,100 207,200 214,600 220,200 255,300
Jotun Majestic Optima Premium 2,5 liter 233,000 254,000 254,000 265,600 258,600 312,200
Jotun Pearl Silk Putih 2,5 liter 152,000 167,200 168,700 177,800 170,200 211,300
Jotun Pearl Silk Putih 20 liter 1,200,000 1,296,000 1,296,000 1,308,000 1,284,000 1,560,000
Jotun Pearl Silk Standar 2,5 liter 152,000 167,200 162,600 176,300 165,700 193,000
Jotun Pearl Silk Standar 20 liter 1,100,000 1,155,000 1,210,000 1,265,000 1,155,000 1,485,000
Jotun Pearl Silk Premium 2,5 liter 117,000 125,200 129,900 129,900 125,200 150,900
Jotun Matt Putih 2,5 liter 152,000 162,600 162,600 164,200 176,300 185,400
Jotun Matt Putih 20 liter 1,100,000 1,166,000 1,155,000 1,232,000 1,188,000 1,518,000
Jotun Matt Standar 2,5 liter 152,000 164,200 165,700 171,800 179,400 187,000
Jotun Matt Standar 20 liter 1,100,000 1,166,000 1,221,000 1,221,000 1,155,000 1,353,000
Jotun Matt Premium 2,5 liter 216,500 227,300 233,800 253,300 231,700 298,800
Jotun Glaze Special 1 liter 183,000 192,200 205,000 206,800 205,000 236,100
Jotun Metalic Golden Glow 1 liter 172,500 189,800 191,500 184,600 201,800 222,500
Jotun Metalic Starlight 1 liter 462,000 485,100 485,100 503,600 522,100 591,400
Jotun Strax Matt Putih 2,5 liter 103,000 112,300 109,200 121,500 109,200 142,100

355/396
Jotun Strax Matt Putih 20 liter 730,000 781,100 766,500 839,500 766,500 1,014,700
Jotun Strax Matt Standar 2,5 liter 104,000 113,400 110,200 113,400 123,800 130,000
Jotun Strax Matt Standar 20 liter 740,000 814,000 814,000 806,600 873,200 902,800
Jotun Strax Matt Premium 2,5 liter 136,000 149,600 145,500 156,400 160,500 190,400
Jotun Jotaplast Putih 2,5 liter 60,000 64,200 62,400 69,000 71,400 74,400
Jotun Jotaplast Putih 20 liter 468,000 505,400 491,400 500,800 491,400 561,600
Jotun Jotaplast Premium 2,5 liter 57,000 59,900 61,600 60,400 60,400 78,100
Jotun Jotaplast Premium 20 liter 465,000 497,600 520,800 534,800 553,400 590,600
13 TRIPLEKS - - - - -
Triplek Hard Wood 122x244, tebal 3mm Lembar 45,000 48,600 47,300 53,600 51,300 58,500
Triplek Hard Wood 122x244, tebal 4mm Lembar 55,000 60,000 59,400 63,800 60,500 77,000
Triplek Hard Wood 122x244, tebal 8mm Lembar 85,000 93,500 89,300 96,900 100,300 102,000
Triplek Hard Wood 122x244, tebal 9mm Lembar 90,000 95,400 95,400 95,400 105,300 108,900
Triplek Hard Wood 122x244, tebal 12mm Lembar 140,000 149,800 145,600 165,200 149,800 190,400
Triplek Hard Wood 122x244, tebal 15mm Lembar 175,000 183,800 183,800 199,500 199,500 225,800
Triplek Hard Wood 122x244, tebal 18mm Lembar 220,000 233,200 242,000 233,200 253,000 272,800
14 BESI HOLLOW HITAM - - - - -
Hollow 15 x 30 x 0.60 mm Batang/4m 31,500 34,700 35,000 35,300 35,000 40,000
Hollow 15 x 30 x 0.80 mm Batang/4m 41,000 44,700 44,300 48,400 45,500 50,400
Hollow 15 x 30 x 1.10 mm Batang/4m 56,500 62,200 62,200 59,900 62,700 76,800
Hollow 15 x 30 x 1.40 mm Batang/4m 65,000 70,900 68,300 68,900 72,800 80,000
Hollow 17 x 37 x 0.60 mm Batang/4m 36,000 39,600 39,200 38,900 38,200 49,000
Hollow 17 x 37 x 1.10 mm Batang/4m 66,000 72,600 72,600 71,900 69,300 88,400
Hollow 17 x 37 x 1.40 mm Batang/4m 79,000 85,300 83,000 89,300 85,300 105,100
Hollow 17 x 37 x 1.70 mm Batang/4m 88,500 94,700 94,700 103,500 97,400 121,200
Hollow 20 x 20 x 0.60 mm Batang/4m 27,500 29,700 28,600 31,600 32,500 36,600
Hollow 20 x 20 x 1.10 mm Batang/4m 50,000 53,500 55,500 59,500 59,500 67,000
Hollow 20 x 20 x 1.40 mm Batang/4m 60,500 66,600 66,600 64,700 63,500 82,900
Hollow 20 x 20 x 1.70 mm Batang/4m 67,500 72,200 71,600 74,300 80,300 89,100
Hollow 20 x 40 x 0.60 mm Batang/4m 42,500 45,900 46,300 49,300 51,000 57,400
Hollow 20 x 40 x 0.80 mm Batang/4m 55,000 57,800 58,900 62,700 60,500 74,300
Hollow 20 x 40 x 1.10 mm Batang/4m 70,500 76,800 76,100 79,700 76,800 93,100
Hollow 20 x 40 x 1.40 mm Batang/4m 85,000 89,300 94,400 96,900 102,000 108,800
Hollow 20 x 40 x 1.70 mm Batang/4m 97,500 102,400 104,300 113,100 104,300 129,700
Hollow 20 x 40 x 2.00 mm Batang/4m 113,000 122,000 124,300 123,200 126,600 146,900
Hollow 25 x 50 x 0.80 mm Batang/4m 70,000 75,600 77,700 75,600 74,900 93,100
Hollow 25 x 50 x 1.10 mm Batang/4m 95,500 101,200 105,100 113,600 100,300 129,900
Hollow 25 x 50 x 1.40 mm Batang/4m 116,000 121,800 120,600 132,200 139,200 139,200

356/396
Hollow 25 x 50 x 1.70 mm Batang/4m 120,000 126,000 134,400 130,800 138,000 144,000
Hollow 30 x 30 x 0.60 mm Batang/4m 45,000 49,100 47,300 49,100 47,300 59,400
Hollow 30 x 30 x 0.80 mm Batang/4m 55,000 59,400 57,200 61,100 63,300 73,200
Hollow 30 x 30 x 1.10 mm Batang/4m 76,500 80,300 83,400 84,900 82,600 97,200
Hollow 30 x 30 x 1.40 mm Batang/4m 88,000 95,000 98,600 98,600 97,700 121,400
Hollow 30 x 30 x 1.70 mm Batang/4m 92,000 96,600 103,000 99,400 104,900 112,200
Hollow 30 x 30 x 2.00 mm Batang/4m 101,000 109,100 113,100 120,200 121,200 136,400
Hollow 30 x 60 x 0.80 mm Batang/4m 83,000 89,600 88,800 88,000 99,600 114,500
Hollow 30 x 60 x 1.10 mm Batang/4m 115,000 123,100 123,100 136,900 125,400 159,900
Hollow 30 X 60 X 1.40 mm Batang/4m 140,000 148,400 152,600 161,000 154,000 177,800
Hollow 30 X 60 X 1.70 mm Batang/4m 145,000 153,700 159,500 156,600 156,600 184,200
Hollow 37 X 37 X 0.60 mm Batang/4m 53,000 57,800 55,700 60,400 56,700 73,700
Hollow 37 X 37 X 0.80 mm Batang/4m 65,000 71,500 68,900 76,100 70,200 79,300
Hollow 37 X 37 X 1.10 mm Batang/4m 90,000 95,400 97,200 104,400 97,200 126,000
Hollow 37 X 37 X 1.40 mm Batang/4m 109,000 116,600 122,100 116,600 115,500 136,300
Hollow 37 X 37 X 1.70 mm Batang/4m 112,000 122,100 121,000 119,800 119,800 144,500
Hollow 40 X 40 X 0.80 mm Batang/4m 74,000 80,700 77,000 79,200 88,800 92,500
Hollow 40 X 40 X 1.10 mm Batang/4m 93,000 101,400 97,700 103,200 107,900 123,700
Hollow 40 X 40 X 1.40 mm Batang/4m 113,000 119,800 124,300 134,500 133,300 137,900
Hollow 40 X 40 X 1.70 mm Batang/4m 129,000 138,000 139,300 143,200 138,000 180,600
Hollow 40 X 40 X 2.00 mm Batang/4m 150,000 157,500 166,500 178,500 177,000 210,000
Hollow 40 X 60 X 0.60 mm Batang/4m 75,000 80,300 81,800 81,800 84,000 90,800
Hollow 40 X 60 X 1.10 mm Batang/4m 129,000 140,600 143,200 149,600 141,900 176,700
Hollow 40 X 60 X 1.40 mm Batang/4m 156,000 163,800 174,700 176,300 187,200 204,400
Hollow 40 X 60 X 1.70 mm Batang/4m 160,000 174,400 166,400 174,400 174,400 204,800
Hollow 40 X 60 X 2.00 mm Batang/4m 220,000 231,000 244,200 253,000 239,800 305,800
Hollow 50 X 50 X 1.10 mm Batang/4m 129,000 135,500 134,200 138,000 154,800 158,700
Hollow 50 X 50 X 1.40 mm Batang/4m 156,000 163,800 173,200 182,500 163,800 199,700
Hollow 50 X 50 X 1.70 mm Batang/4m 160,000 172,800 176,000 188,800 177,600 195,200
Hollow 50 X 50 X 2.00 mm Batang/4m 222,000 244,200 235,300 250,900 244,200 297,500
15 PINTU PVC - - - - -
Pintu PVC Kamar Mandi RE3G Unit 450,000 472,500 490,500 486,000 522,000 567,000
Pintu PVC Kamar Mandi ETZA Unit 435,000 478,500 482,900 482,900 487,200 552,500
Pintu PVC Kamar Mandi CESSA Unit 220,000 235,400 244,200 250,800 242,000 266,200
Pintu PVC Kamar Mandi Cream RPP Unit 375,000 405,000 397,500 401,300 431,300 495,000
16 TANGKI AIR (TANDOM) - - - - -
Penguin TB25 225 Liter 460,000 496,800 510,600 529,000 492,200 621,000
Penguin TB32 300 Liter 510,000 555,900 530,400 581,400 596,700 663,000

357/396
Penguin TB55 520 Liter 745,000 812,100 834,400 871,700 804,600 938,700
Penguin TB70 650 Liter 860,000 903,000 954,600 963,200 971,800 1,040,600
Penguin TB110 1050 Liter 1,225,000 1,310,800 1,359,800 1,347,500 1,408,800 1,506,800
Penguin TB120 1200 Liter 1,465,000 1,538,300 1,582,200 1,582,200 1,758,000 1,904,500
Penguin TB160 1550 Liter 1,840,000 1,987,200 2,042,400 2,042,400 2,079,200 2,208,000
Penguin TB200 2000 Liter 2,550,000 2,728,500 2,703,000 2,805,000 2,677,500 3,519,000
Excel GS 700 Stainless Steel 700 Liter 2,190,000 2,343,300 2,409,000 2,409,000 2,430,900 2,715,600
Excel GS 800 Stainless Steel 800 Liter 2,550,000 2,779,500 2,805,000 2,932,500 2,958,000 3,315,000
Excel GS 1100 Stainless Steel 1100 Liter 3,550,000 3,869,500 3,905,000 4,011,500 3,905,000 4,331,000
Excel GS 2500 Stainless Steel 2500 Liter 4,750,000 5,130,000 5,177,500 5,272,500 5,652,500 5,937,500
Tirta T.500 400 Liter 1,345,000 1,412,300 1,452,600 1,560,200 1,573,700 1,842,700
Tirta T.1000 750 Liter 1,810,000 1,918,600 1,954,800 2,099,600 1,972,900 2,190,100
Tirta T.1200 900 Liter 1,925,000 2,040,500 2,098,300 2,194,500 2,271,500 2,656,500
Tirta T.1500 1100 Liter 2,345,000 2,556,100 2,626,400 2,696,800 2,509,200 3,259,600
Tirta T.1800 1350 Liter 2,575,000 2,755,300 2,678,000 2,729,500 3,012,800 3,296,000
17 AKRILIK - - - - -
Acrylic Bening 122 x 244cm ( 4’ x 8’ ), tebal 1.5mm Lembar 285,000 313,500 310,700 313,500 302,100 399,000
Acrylic Bening 122 x 244cm ( 4’ x 8’ ), tebal 2.0mm Lembar 375,000 401,300 390,000 438,800 393,800 513,800
Acrylic Bening 122 x 244cm ( 4’ x 8’ ), tebal 3.0mm Lembar 530,000 556,500 593,600 572,400 567,100 673,100
Acrylic Bening 122 x 244cm ( 4’ x 8’ ), tebal 4.0mm Lembar 700,000 742,000 770,000 756,000 826,000 938,000
Acrylic Bening 122 x 244cm ( 4’ x 8’ ), tebal 5.0mm Lembar 850,000 926,500 952,000 926,500 926,500 1,105,000
Acrylic Bening 122 x 244cm ( 4’ x 8’ ), tebal 6.0mm Lembar 951,000 1,017,600 1,065,100 1,027,100 1,122,200 1,198,300
Acrylic Bening 122 x 244cm ( 4’ x 8’ ), tebal 10mm Lembar 1,650,000 1,765,500 1,782,000 1,914,000 1,930,500 2,029,500
Acrylic Bening 100 x 200cm, tebal 2.0mm Lembar 275,000 297,000 308,000 313,500 288,800 357,500
Acrylic Bening 100 x 200cm, tebal 4.0mm Lembar 900,000 990,000 981,000 963,000 945,000 1,161,000
Acrylic Bening 122 x 610cm, tebal 3.0mm Lembar 1,700,000 1,870,000 1,887,000 1,989,000 2,040,000 2,329,000
Acrylic Bening 122 x 610cm, tebal 5.0mm Lembar 2,800,000 2,968,000 2,968,000 2,968,000 2,940,000 3,472,000
Acrylic Warna 100 x 200cm, tebal 2mm Lembar 305,000 329,400 338,600 350,800 332,500 390,400
Acrylic Warna 100 x 200cm, tebal 3mm Lembar 425,000 467,500 463,300 480,300 501,500 586,500
Acrylic Warna 100 x 200cm, tebal 4mm Lembar 545,000 594,100 566,800 599,500 632,200 719,400
Acrylic Warna 100 x 200cm, tebal 5mm Lembar 655,000 700,900 694,300 720,500 727,100 903,900
Acrylic Warna 100 x 200cm, tebal 6mm Lembar 782,000 852,400 852,400 883,700 821,100 946,200
Acrylic Warna 100 x 200cm, tebal 8mm Lembar 1,025,000 1,117,300 1,096,800 1,127,500 1,189,000 1,394,000
Acrylic Warna 100 x 200cm, tebal 10mm Lembar 1,265,000 1,378,900 1,416,800 1,340,900 1,340,900 1,619,200
18 PARKUET LANTAI - - - - -
Costul (DCW)12 x 102 x 900 mm M2 325,500 341,800 354,800 374,300 390,600 436,200
Costul (DCW)12 x 102 x 925 mm M2 350,500 378,500 389,100 392,600 389,100 455,700
Kalimantan Poon12 x 102 x 900mm M2 325,500 345,000 341,800 351,500 358,100 439,400

358/396
Kalimantan Poon12 x 102 x 925 mm M2 350,500 368,000 368,000 382,000 417,100 441,600
Light Nyatoh12 x 102 x 900 mm M2 325,500 341,800 341,800 387,300 374,300 445,900
Light Nyatoh12 x 102 x 925 mm M2 350,500 382,000 392,600 378,500 420,600 445,100
Dark Nyatoh12 x 102 x 900 mm M2 325,500 345,000 354,800 387,300 374,300 413,400
Dark Nyatoh12 x 102 x 925 mm M2 350,500 375,000 389,100 417,100 413,600 424,100
Padauk12 x 102 x 900 mm M2 325,500 358,100 364,600 374,300 351,500 432,900
Padauk12 x 102 x 925 mm M2 350,500 382,000 392,600 382,000 420,600 438,100
Kerangas12 x 102 x 900 mm M2 325,500 358,100 338,500 374,300 361,300 393,900
Kerangas12 x 102 x 925 mm M2 350,500 368,000 389,100 382,000 382,000 483,700
19 KACA - - - - -
Kaca Bening Tebal 2 mm M2 55,000 60,000 61,600 63,800 64,400 66,000
Kaca Bening Tebal 3 mm M2 85,000 89,300 92,700 95,200 96,100 102,900
Kaca Bening Tebal 5 mm M2 95,000 99,800 104,500 109,300 114,000 115,900
Kaca Bening Tebal 8 mm M2 155,000 164,300 169,000 173,600 181,400 198,400
Kaca Bening Tebal 10 mm M2 230,000 243,800 246,100 250,700 259,900 301,300
Kaca Rayban Tebal 3 mm M2 67,000 71,000 73,000 77,700 78,400 88,400
Kaca Rayban Tebal 5 mm M2 70,000 74,200 72,800 77,000 82,600 84,000
Kaca Rayban Tebal 8 mm M2 130,000 136,500 137,800 140,400 136,500 156,000
Kaca Rayban Tebal 10 mm M2 225,000 243,000 247,500 238,500 261,000 306,000
Kaca clear tempered 5 mm M2 220,000 235,400 231,000 239,800 239,800 281,600
Kaca clear tempered 6 mm M2 250,000 267,500 272,500 282,500 295,000 302,500
Kaca clear tempered 8 mm M2 380,000 402,800 425,600 433,200 452,200 532,000
Kaca clear tempered 10 mm M2 415,000 452,400 452,400 481,400 493,900 510,500
Kaca clear tempered 12 mm M2 465,000 488,300 511,500 534,800 520,800 562,700
Kaca clear tempered 15 mm M2 1,975,000 2,152,800 2,054,000 2,330,500 2,192,300 2,666,300
Kaca clear tempered 19 mm M2 2,475,000 2,673,000 2,598,800 2,697,800 2,722,500 2,994,800
20 PAVING BLOK - - - - -
Model Bata 6 cm m2 82,000 86,900 86,100 93,500 90,200 106,600
Model Bata 8 cm m2 97,000 103,800 102,800 112,500 108,600 133,900
Model Cacing 6 cm m2 82,000 90,200 89,400 96,800 91,800 109,900
Model Cacing 8 cm m2 97,000 101,900 108,600 102,800 106,700 131,000
Model Hexagon 6 cm m2 82,000 90,200 86,100 86,900 90,200 107,400
Model Hexagon 8 cm m2 97,000 104,800 106,700 115,400 102,800 121,300
Model Trihex 6 cm m2 82,000 87,700 91,800 95,900 95,100 112,300
Model Trihex 8 cm m2 92,000 100,300 100,300 103,000 98,400 128,800
Model Ubin Set 6 cm m2 97,000 101,900 107,700 115,400 109,600 135,800
Model Ubin Set 8 cm m2 107,000 115,600 112,400 126,300 112,400 130,500
Model Ubin Kecil 6 cm m2 97,000 106,700 107,700 113,500 116,400 123,200

359/396
Model Ubin Kecil 8 cm m2 107,000 113,400 113,400 123,100 115,600 131,600
Model Ubin Full 6 cm m2 94,000 98,700 101,500 104,300 110,900 116,600
Model Ubin Full 8 cm m2 104,000 109,200 112,300 115,400 114,400 140,400
Model Topi Uskup 6 cm pcs 8,500 9,400 9,300 9,900 9,100 10,500
Model Topi Uskup 8 cm pcs 5,500 6,000 6,000 5,900 5,800 7,600
21 KALSIBOARD - - - - -
KalsiRata 3 Size 1000x1000 Lbr 14,700 15,400 16,300 16,300 16,900 20,600
KalsiRata 3 Size 1000x2000 Lbr 32,500 34,100 33,800 35,100 36,100 44,200
KalsiRata 3 Size 500x2000 Lbr 14,500 15,400 15,800 16,400 17,400 20,000
KalsiBoard Ling 3,5 Size 1220x2440 Lbr 61,500 67,700 64,600 70,100 68,900 73,800
KalsiBoard Ling 3,5 Size 1200x2400 Lbr 60,000 66,000 64,200 66,000 71,400 81,600
KalsiBoard Ling 4,5 Size 1220x2440 Lbr 85,000 92,700 95,200 91,800 95,200 104,600
KalsiBoard Ling 4,5 Size 1000x2400 Lbr 82,500 88,300 86,600 94,100 89,100 115,500
KalsiBoard Ling 6 Size 1220x2440 Lbr 125,500 134,300 139,300 136,800 133,000 151,900
KalsiBoard Ling 6 Size 1200x2400 Lbr 121,500 130,000 126,400 130,000 144,600 156,700
KalsiBoard Ling 6 Size 1200x2700 Lbr 136,500 150,200 143,300 151,500 150,200 191,100
KalsiBoard Ling 6 Size 1200x3000 Lbr 152,000 165,700 159,600 167,200 167,200 200,600
KalsiPart 8 Size 1220x2440 Lbr 170,000 187,000 185,300 190,400 193,800 217,600
KalsiPart 8 Size 1200x2400 Lbr 163,500 171,700 179,900 174,900 186,400 215,800
KalsiPart 8 Size 1200x2700 Lbr 183,500 201,900 205,500 207,400 218,400 234,900
KalsiPart 8 Size 1200x3000 Lbr 203,500 215,700 215,700 240,100 238,100 270,700
KalsiClad 10 Size 1220x2440 Lbr 207,500 226,200 224,100 244,900 222,000 273,900
KalsiClad 10 Size 1200x2400 Lbr 199,000 210,900 218,900 232,800 218,900 268,700
KalsiClad 10 Size 1200x2700 Lbr 224,500 235,700 235,700 253,700 269,400 300,800
KalsiClad 10 Size 1200x3000 Lbr 249,500 272,000 262,000 284,400 267,000 306,900
KalsiClad 12 Size 1220x2440 Lbr 251,500 266,600 281,700 274,100 269,100 352,100
KalsiClad 12 Size 1200x2400 Lbr 240,500 259,700 254,900 254,900 257,300 288,600
KalsiClad 12 Size 1200x2700 Lbr 272,000 291,000 299,200 291,000 318,200 353,600
KalsiClad 12 Size 1200x3000 Lbr 302,500 329,700 320,700 335,800 317,600 384,200
KalsiQua 8 Size 1200x2400 Lbr 208,500 225,200 216,800 229,400 241,900 289,800
KalsiFloor 20 Size 1200x2400 Lbr 552,500 580,100 613,300 585,700 580,100 674,100
22 WASTAFEL KAMAR MANDI - - - - -
Toto LW 660 CJ 3,500,000 3,850,000 3,815,000 4,130,000 3,990,000 4,795,000
Toto LW 645 JN 5,430,000 5,973,000 6,081,600 6,353,100 5,973,000 6,570,300
Toto LW 643 J 3,495,000 3,669,800 3,739,700 4,019,300 3,669,800 4,788,200
Toto L 652 D 1,600,000 1,760,000 1,680,000 1,728,000 1,856,000 2,176,000
Toto L 521 V1A 2,595,000 2,750,700 2,724,800 3,036,200 3,088,100 3,165,900
American Std New Codie 43cm 1,050,000 1,102,500 1,144,500 1,207,500 1,113,000 1,407,000

360/396
American Std Acacia e lava 60cm 2,640,000 2,877,600 2,745,600 2,798,400 2,798,400 3,405,600
23 WASTFEL CUCI - - - - -
Teka Sink Stainless Steel 2,375,000 2,612,500 2,588,800 2,707,500 2,565,000 2,968,800
Blanco Tipo XL6S 4,250,000 4,632,500 4,590,000 5,057,500 4,887,500 5,312,500
Modena Sink KS 4200 2,005,000 2,165,400 2,245,600 2,185,500 2,386,000 2,746,900
Delizia Zink Ferrara DZW 2,685,000 2,953,500 2,899,800 2,980,400 3,195,200 3,410,000
Portable Mutu KCS 15R 4,950,000 5,197,500 5,395,500 5,544,000 5,445,000 6,534,000
Wastafel Metalco MS 36/ 18 215,000 227,900 240,800 236,500 258,000 292,400
Wastafel Metalco MS 30/ 18 185,000 203,500 207,200 207,200 203,500 257,200
Wastafel Metalco MS 42/ 18 225,000 245,300 234,000 252,000 261,000 303,800
Wastafel Metalco MS 32/ 18 120,000 130,800 129,600 136,800 142,800 160,800
Merk Toto LW236CJ 500,000 535,000 545,000 540,000 550,000 610,000
Merk Toto  L237V1B 560,000 599,200 604,800 593,600 599,200 767,200
Merk Toto  L237V3 560,000 593,600 610,400 610,400 632,800 750,400
Merk Toto  LW810CJ 695,000 743,700 757,600 736,700 792,300 847,900
Merk Toto  L650D 715,000 779,400 757,900 829,400 843,700 900,900
Merk Toto LW815CJ 865,000 908,300 942,900 1,020,700 1,029,400 1,081,300
Merk Toto LW811CJ 1,050,000 1,144,500 1,176,000 1,239,000 1,260,000 1,312,500
Merk Toto  LW103JT1 1,295,000 1,424,500 1,437,500 1,541,100 1,515,200 1,800,100
Merk Toto LW812CJR 2,055,000 2,219,400 2,301,600 2,424,900 2,219,400 2,815,400
Merk Toto LW812CJL 2,305,000 2,512,500 2,558,600 2,443,300 2,512,500 3,134,800
24 ASBES GELOMBANG - - - - -
Jabesmen gelombang 150×105 mm 47,000 50,800 52,200 54,100 53,100 59,700
Jabesmen gelombang 180×105 mm 52,500 57,800 56,200 61,400 61,400 67,700
Jabesmen gelombang 210×105 mm 58,000 63,800 60,300 66,100 69,000 72,500
Jabesmen gelombang 240×105 mm 67,000 73,000 71,700 77,100 76,400 91,100
Jabesmen gelombang 270×105 mm 75,000 82,500 80,300 82,500 83,300 100,500
Jabesmen gelombang 300×105 mm 83,000 90,500 87,200 97,100 99,600 102,100
Nok Asbes pasang 44,000 47,100 47,100 50,200 48,800 60,700
Asbes Harvlex 150 x 80 x 0.35 Lembar 29,000 31,900 30,700 31,300 33,400 36,300
Asbes Harvlex 180 x 80 x 0.35 Lembar 33,000 36,300 36,000 38,900 38,000 45,900
Asbes Harvlex 210 x 80 x 0.35 Lembar 38,000 40,300 40,700 41,800 45,600 46,700
Asbes Harvlex 240 x 80 x 0.35 Lembar 42,000 44,100 45,400 50,000 46,600 55,900
Asbes Harvlex 270 x 80 x 0.35 Lembar 50,000 53,500 53,000 54,000 54,000 64,000
Asbes Harvlex 300 x 80 x 0.35 Lembar 56,000 61,600 62,200 63,800 62,700 70,600
Asbes Harvlex 150 x 105 x 0.4 Lembar 45,000 48,600 47,300 49,500 47,700 58,100
Asbes Harvlex 180 x 105 x 0.4 Lembar 50,000 54,000 55,000 55,500 59,000 69,000
Asbes Harvlex 210 x 105 x 0.4 Lembar 57,000 60,400 62,700 67,300 67,800 71,800

361/396
Asbes Harvlex 240 x 105 x 0.4 Lembar 69,000 74,500 74,500 77,300 72,500 89,700
Asbes Harvlex 270 x 105x 0.4 Lembar 75,000 81,000 78,000 80,300 84,000 99,000
Asbes Harvlex 300 x 105 x 0.4 Lembar 83,000 88,000 87,200 96,300 92,100 111,200
25 POLYCARBONATE - - - - -
Polycarbonate Twinlite -5 mm Roll/2.1mx11.8 m 2,200,000 2,398,000 2,354,000 2,354,000 2,486,000 2,882,000
Polycarbonate Twinlite -6 mm Roll/2.1mx11.8 m 2,480,000 2,728,000 2,678,400 2,802,400 2,752,800 3,199,200
Polycarbonate Twinlite -10 mm Roll/2.1mx11.8 m 3,500,000 3,815,000 3,745,000 3,710,000 3,920,000 4,480,000
Polycarbonate Lexan Easy Clean -6 mm Roll/2.1mx11.8 m 2,760,000 2,953,200 2,925,600 3,201,600 3,008,400 3,836,400
Polycarbonate X-Lite -4,5 mm Roll/2.1mx11.8 m 1,315,000 1,446,500 1,459,700 1,420,200 1,578,000 1,722,700
Polycarbonate Duromax -4,8 mm Roll/2.1mx11.8 m 1,670,000 1,803,600 1,770,200 1,970,600 1,920,500 2,054,100
Polycarbonate Solarlite -5 mm Roll/2.1mx11.8 m 1,770,000 1,947,000 1,893,900 1,911,600 2,124,000 2,141,700
Polycarbonate GE Carboron -5 mm Roll/2.1mx11.8 m 1,870,000 2,038,300 2,019,600 1,982,200 1,982,200 2,244,000
Polycarbonate GE Carboron -6 mm Roll/2.1mx11.8 m 2,150,000 2,257,500 2,257,500 2,365,000 2,429,500 2,967,000
Polycarbonate Polykron -5 mm Roll/2.1mx11.8 m 2,050,000 2,234,500 2,152,500 2,234,500 2,214,000 2,583,000
Polycarbonate Global -4,2 mm Roll/2.1mx11.8 m 1,225,000 1,286,300 1,323,000 1,433,300 1,298,500 1,482,300
Polycarbonate Global -4,5 mm Roll/2.1mx11.8 m 1,395,000 1,492,700 1,506,600 1,576,400 1,646,100 1,757,700
Polycarbonate De’Light -4 mm Roll/2.1mx11.8 m 1,055,000 1,139,400 1,118,300 1,139,400 1,266,000 1,318,800
26 WIREMESH - - - - -
Wiremesh M5-2,1 m x 5,4 m Lembar 210,000 228,900 231,000 237,300 237,300 277,200
Wiremesh M6-2,1 m x 5,4 m Lembar 310,000 341,000 331,700 337,900 372,000 412,300
Wiremesh M7-2,1 m x 5,4 m Lembar 420,000 441,000 470,400 487,200 491,400 575,400
Wiremesh M8-2,1 m x 5,4 m Lembar 545,000 577,700 566,800 615,900 643,100 692,200
Wiremesh M9-2,1 m x 5,4 m Lembar 720,000 763,200 763,200 856,800 849,600 871,200
Wiremesh M10-2,1 m x 5,4 m Lembar 875,000 936,300 910,000 971,300 1,023,800 1,146,300
27 WALPAPER DINDING - - - - -
Merk Clear Spirit 0.53m x 10.00m Roll 320,000 342,400 355,200 364,800 352,000 448,000
Merk Daon Vol 3 1.06m x 15.60m Roll 580,000 638,000 603,200 661,200 661,200 730,800
Merk Dream World 1.06m x 15.60m Roll 665,000 711,600 731,500 744,800 771,400 824,600
Merk Grand City 0.53m x 10.00m Roll 258,000 281,200 286,400 294,100 296,700 312,200
Merk Jack & Rose 0.53m x 10.00m Roll 260,000 275,600 283,400 293,800 309,400 319,800
Merk Jade 3d Image 0.53m x 10.00m Roll 210,000 231,000 235,200 222,600 243,600 294,000
Merk Kahn Design 1.06m x 15.60m Roll 420,000 445,200 449,400 474,600 478,800 575,400
Merk Modern Wallcoverings 0.53m x 10.00m Roll 210,000 226,800 224,700 233,100 226,800 294,000
Merk Polaris Vol 3 1.06m x 15.60m Roll 610,000 671,000 640,500 719,800 640,500 786,900
Merk Silk House 1.06m x 15.60m Roll 630,000 661,500 661,500 724,500 749,700 756,000
Merk Smart Wall 0.53m x 10.00m Roll 750,000 817,500 780,000 862,500 855,000 1,042,500
Merk Zinnia 1.06m x 15.60m Roll 725,000 775,800 761,300 855,500 862,800 899,000
28 PIPA PVC - - - - -

362/396
PIPA WAVIN AW 1/2″ Btg 22,000 24,200 23,500 23,800 23,800 29,300
PIPA WAVIN AW 3/4″ Btg 29,000 30,500 32,200 32,200 33,900 39,200
PIPA WAVIN AW 1″ Btg 39,000 41,000 40,600 46,000 44,100 46,800
PIPA WAVIN AW 1-1/4″ Btg 59,000 64,900 64,900 65,500 69,600 72,000
PIPA WAVIN AW 1-1/2″ Btg 68,000 72,100 76,200 80,200 79,600 89,100
PIPA WAVIN AW 2″ Btg 87,000 92,200 90,500 92,200 99,200 114,800
PIPA WAVIN AW 2-1/2″ Btg 127,000 134,600 139,700 134,600 144,800 161,300
PIPA WAVIN AW 3″ Btg 178,000 194,000 199,400 201,100 194,000 231,400
PIPA WAVIN AW 4″ Btg 293,000 313,500 307,700 334,000 337,000 395,600
PIPA WAVIN AW 5″ Btg 465,000 497,600 506,900 520,800 530,100 595,200
PIPA WAVIN AW 6″ Btg 655,000 720,500 727,100 759,800 727,100 884,300
PIPA WAVIN AW 8″ Btg 1,100,000 1,166,000 1,166,000 1,232,000 1,210,000 1,375,000
PIPA WAVIN AW 10″ Btg 1,695,000 1,830,600 1,864,500 1,966,200 1,881,500 2,356,100
PIPA WAVIN AW 12″ Btg 2,400,000 2,568,000 2,688,000 2,736,000 2,688,000 3,264,000
PIPA Rucika PV 1/2″ Btg 38,000 39,900 41,800 41,400 41,400 53,200
PIPA Rucika PV 3/4″ Btg 45,000 48,600 49,100 50,900 50,400 59,000
PIPA Rucika PV 1″ Btg 67,000 71,000 73,000 75,700 80,400 84,400
PIPA Rucika PV 1-1/4″ Btg 90,500 96,800 95,000 105,000 107,700 109,500
PIPA Rucika PV 1-1/2″ Btg 118,000 123,900 131,000 135,700 126,300 142,800
PIPA Rucika PV 2″ Btg 167,000 177,000 180,400 188,700 190,400 225,500
PIPA Rucika PV 2-1/2″ Btg 215,000 232,200 238,700 247,300 225,800 294,600
PIPA Rucika PV 3″ Btg 340,000 357,000 370,600 394,400 394,400 448,800
PIPA Rucika PV 4″ Btg 528,000 580,800 570,200 559,700 612,500 739,200
PIPA Rucika PV 5″ Btg 660,000 706,200 732,600 778,800 739,200 864,600
PIPA Rucika PV 6″ Btg 991,000 1,080,200 1,109,900 1,129,700 1,189,200 1,218,900
PIPA Rucika PV 8″ Btg 1,500,000 1,620,000 1,650,000 1,770,000 1,635,000 2,025,000
PIPA Rucika PV 10″ Btg 2,280,000 2,485,200 2,439,600 2,462,400 2,667,600 2,827,200
PIPA Rucika PV 12″ Btg 3,240,000 3,466,800 3,434,400 3,790,800 3,758,400 4,276,800
29 BETON READY MIX - - - - -
Beton Ready Mix Klass A K 500 m3 1,000,000 1,070,000 1,110,000 1,080,000 1,070,000 1,360,000
Beton Ready Mix Klass B K 400 m3 950,000 1,016,500 1,054,500 1,016,500 997,500 1,197,000
Beton Ready Mix Klas B K 375 m3 930,000 1,013,700 976,500 1,023,000 1,060,200 1,274,100
Beton Ready Mix Klass B K350 m3 910,000 964,600 991,900 1,073,800 982,800 1,128,400
Beton Ready Mix Klass K 325 m3 890,000 934,500 961,200 952,300 1,023,500 1,210,400
Beton Ready Mix Klass K 300 m3 870,000 930,900 930,900 957,000 1,017,900 1,157,100
Beton Ready Mix Klass K 275 m3 850,000 909,500 935,000 952,000 977,500 1,071,000
Beton Ready Mix Klass K 250 m3 830,000 904,700 929,600 904,700 896,400 1,070,700
Beton Ready Mix Klass K 225 (Mobil Standar) m3 810,000 850,500 899,100 939,600 907,200 1,069,200

363/396
Beton Ready Mix Klass 225 ( Mini Mix / Mobil Kecil) m3 1,190,000 1,273,300 1,237,600 1,273,300 1,332,800 1,535,100
30 KABEL LISTRIK - - - - -
Eterna NYA 1 x 1,5 100 m 145,000 153,700 155,200 155,200 168,200 200,100
Eterna NYA 1 x 2,5 100 m 230,000 253,000 246,100 255,300 259,900 282,900
Eterna NYA 1 x 4 100 m 360,000 378,000 381,600 381,600 417,600 496,800
Eterna NYA 1 x 6 100 m 530,000 572,400 567,100 604,200 636,000 641,300
Eterna NYA 1 x 10 100 m 877,000 947,200 929,600 1,008,600 955,900 1,131,300
Eterna NYA 3 x 1,5 50 m 293,000 307,700 319,400 319,400 328,200 351,600
Eterna NYA 3 x 2,5 50 m 417,000 450,400 433,700 487,900 462,900 508,700
Eterna NYA 2 x 1,5 50 m 229,000 242,700 242,700 251,900 247,300 304,600
Eterna NYA 2 x 2,5 50 m 328,000 354,200 367,400 377,200 373,900 449,400
Eterna NYA 3 x 4 50 m 687,000 728,200 748,800 769,400 783,200 954,900
Eterna NYM 4 x 2,5 50 m 535,000 572,500 593,900 631,300 577,800 679,500
Eterna NYM 4 x 4 50 m 885,000 938,100 991,200 982,400 938,100 1,088,600
Eterna NYM 4 x 6 50 m 1,245,000 1,319,700 1,357,100 1,332,200 1,469,100 1,494,000
Eterna NYM 4 x 10 50 m 2,027,000 2,168,900 2,229,700 2,168,900 2,189,200 2,614,800
Eterna NYY 2 x 1,5 50 m 322,000 341,300 334,900 370,300 373,500 444,400
Eterna NYY 2 x 2,5 50 m 434,000 464,400 455,700 490,400 460,000 525,100
Eterna NYY 3 x 1,5 50 m 398,000 425,900 421,900 473,600 477,600 529,300
Eterna NYY 3 x 2,5 50 m 830,000 879,800 888,100 962,800 904,700 1,128,800
Eterna NYY 3 x 4 50 m 1,100,000 1,166,000 1,188,000 1,298,000 1,155,000 1,496,000
Eterna NYY 3 x 6 50 m 648,000 712,800 686,900 706,300 719,300 810,000
Eterna NYY 4 x 2,5 50 m 1,010,000 1,060,500 1,100,900 1,171,600 1,080,700 1,383,700
Eterna NYY 4 x 4 50 m 1,310,000 1,388,600 1,388,600 1,454,100 1,427,900 1,611,300
Eterna NYY 4 x 6 50 m 2,220,000 2,353,200 2,442,000 2,397,600 2,419,800 2,930,400
Supreme NYA 1 x 1,5 100 m 185,000 198,000 201,700 205,400 201,700 229,400
Supreme NYA 1 x 2,5 100 m 300,000 315,000 321,000 351,000 321,000 417,000
Supreme NYM 2 x 1,5 50 m 280,000 302,400 299,600 305,200 308,000 392,000
Supreme NYM 2 x 2,5 50 m 400,000 440,000 440,000 448,000 432,000 520,000
Supreme NYM 3 x 1,5 50 m 360,000 381,600 385,200 417,600 388,800 482,400
Supreme NYM 3 x 2,5 50 m 520,000 546,000 572,000 587,600 618,800 696,800
Supreme NYM 4 x 2,5 50 m 1,400,000 1,512,000 1,498,000 1,498,000 1,582,000 1,918,000
NYY Supreme 2×1,5 mm2 m 25,000 26,800 27,500 28,800 26,500 34,500
NYY Supreme 2×2,5 mm2 m 29,000 30,500 32,500 31,600 31,300 37,400
NYY Supreme 2×4 mm2 m 37,000 38,900 39,600 39,600 39,600 51,800
NYY Supreme 2×6 mm2 m 50,000 54,000 52,500 58,500 54,500 69,500
NYY Supreme 2×10 mm2 m 55,000 60,500 58,300 65,500 60,000 71,000
NYY Supreme 2×16 mm2 m 59,000 63,700 65,500 68,400 67,900 77,300

364/396
NYY Supreme 2×25 mm2 m 90,000 98,100 93,600 101,700 97,200 118,800
NYY Supreme 2×35 mm2 m 122,000 131,800 135,400 133,000 144,000 164,700
NYY Supreme 2×50 mm2 m 164,000 173,800 175,500 178,800 195,200 229,600
NYY Supreme 2×70 mm2 m 232,000 252,900 259,800 248,200 266,800 297,000
NYY Supreme 2×95 mm2 m 309,000 324,500 339,900 355,400 327,500 423,300
NYY Supreme 2×120 mm2 m 386,000 420,700 413,000 443,900 451,600 486,400
NYY Supreme 3×1,5 mm2 m 28,000 29,700 30,000 30,200 33,600 34,200
NYY Supreme 3×2,5 mm2 m 34,000 36,700 37,700 37,100 36,400 41,500
NYY Supreme 3×4 mm2 m 49,000 53,900 51,000 56,800 52,900 60,300
NYY Supreme 3×6 mm2 m 60,000 63,000 63,000 64,800 71,400 84,000
NYY Supreme 3×10 mm2 m 80,000 84,800 86,400 93,600 92,000 108,000
NYY Supreme 3×16 mm2 m 84,000 88,200 91,600 94,900 89,000 111,700
NYY Supreme 3×25 mm2 m 129,000 138,000 143,200 138,000 147,100 179,300
NYY Supreme 3×35 mm2 m 176,000 193,600 184,800 204,200 184,800 223,500
NYY Supreme 3×50 mm2 m 235,000 253,800 258,500 263,200 282,000 317,300
NYY Supreme 3×70 mm2 m 334,000 350,700 354,000 367,400 360,700 427,500
NYY Supreme 3×95 mm2 m 460,000 492,200 515,200 501,400 506,000 602,600
NYY Supreme 3×120 mm2 m 574,000 602,700 631,400 625,700 625,700 729,000
NYY Supreme 3×150 mm2 m 704,000 760,300 774,400 809,600 739,200 929,300
NYY Supreme 3×185 mm2 m 879,000 923,000 958,100 966,900 958,100 1,063,600
NYY Supreme 3×240 mm2 m 1,150 1,200 1,300 1,200 1,400 1,600
NYY Supreme 3×300 mm2 m 1,430 1,600 1,500 1,500 1,500 1,800
NYY Supreme 4×1,5 mm2 m 32,000 34,600 34,200 38,100 36,800 43,200
NYY Supreme 4×2,5 mm2 m 40,000 43,600 44,400 44,800 44,400 49,200
NYY Supreme 4×4 mm2 m 58,000 62,600 62,100 67,300 62,600 80,600
NYY Supreme 4×6 mm2 m 72,000 79,200 75,600 78,500 83,500 95,000
NYY Supreme 4×10 mm2 m 98,000 106,800 109,800 116,600 110,700 134,300
NYY Supreme 4×16 mm2 m 111,000 118,800 121,000 129,900 132,100 139,900
NYY Supreme 4×25 mm2 m 170,000 181,900 176,800 202,300 187,000 234,600
NYY Supreme 4×35 mm2 m 231,000 244,900 249,500 258,700 251,800 309,500
NYY Supreme 4×50 mm2 m 314,000 329,700 339,100 370,500 370,500 398,800
NYY Supreme 4×70 mm2 m 444,000 475,100 466,200 519,500 479,500 617,200
NYY Supreme 4×95 mm2 m 610,000 640,500 640,500 719,800 658,800 762,500
NYY Supreme 4×120 mm2 m 764,000 840,400 825,100 817,500 832,800 1,069,600
NYY Supreme 4×150 mm2 m 940,000 1,024,600 1,005,800 1,081,000 1,128,000 1,306,600
NYY Supreme 4×185 mm2 m 1,160 1,200 1,300 1,400 1,300 1,500
NYY Supreme 4×240 mm2 m 1,530 1,600 1,600 1,800 1,800 1,900
NYY Supreme 4×300 mm2 m 1,900 2,000 2,000 2,200 2,100 2,300

365/396
NYA Extrana 1×1,5 mm2 m 2,200 2,400 2,300 2,600 2,600 2,800
NYA Extrana 1×2,5 mm2 m 3,600 3,800 3,900 4,000 3,900 4,500
NYA Extrana 1×4 mm2 m 5,700 6,100 6,200 6,700 6,500 7,500
NYA Extrana 1×6 mm2 m 8,400 9,200 8,800 9,600 9,500 10,700
NYA Extrana 1×10 mm2 m 14,000 15,300 15,300 16,700 16,800 19,000
NYA Extrana 1×16 mm2 m 13,000 14,200 13,800 15,300 14,200 15,700
NYA Extrana 1×25 mm2 m 21,000 22,300 22,100 24,200 22,900 25,200
NYA Extrana 1×35 mm2 m 28,000 30,200 30,800 32,500 32,800 35,000
NYA Extrana 1×50 mm2 m 38,000 39,900 39,500 45,200 41,800 46,000
NYA Extrana 1×70 mm2 m 54,000 58,900 58,900 59,400 61,600 65,300
NYA Extrana 1×95 mm2 m 75,000 78,800 81,000 87,000 84,800 95,300
NYA Extrana 1×120 mm2 m 95,000 100,700 102,600 102,600 113,100 132,100
NYA Extrana 1×150 mm2 m 117,000 127,500 129,900 131,000 129,900 142,700
NYA Extrana 1×185 mm2 m 145,000 155,200 150,800 163,900 152,300 176,900
NYA Extrana 1×240 mm2 m 190,000 199,500 197,600 224,200 222,300 247,000
NYA Extrana 1×300 mm2 m 240,000 254,400 261,600 273,600 268,800 304,800
NYA Extrana 1×400 mm2 m 300,000 321,000 333,000 351,000 342,000 396,000
NYM Extrana 2×1,5 mm2 m 7,000 7,400 7,500 8,300 7,700 8,900
NYM Extrana 2×2,5 mm2 m 10,000 10,700 10,600 11,600 11,700 12,400
NYM Extrana 2×4 mm2 m 15,000 15,900 16,500 15,900 16,400 18,600
NYM Extrana 2×6 mm2 m 20,000 22,000 21,800 22,200 21,600 24,400
NYM Extrana 2×10 mm2 m 33,000 36,000 35,000 38,600 37,300 46,200
NYM Extrana 3×1,5 mm2 m 9,000 9,700 9,800 9,800 10,300 11,300
NYM Extrana 3×2,5 mm2 m 13,000 13,700 13,800 15,500 15,000 15,600
NYM Extrana 3×4 mm2 m 20,000 21,600 20,800 21,600 21,800 26,000
NYM Extrana 3×6 mm2 m 29,000 30,500 31,000 33,400 33,900 38,000
NYM Extrana 3×10 mm2 m 48,000 52,800 50,900 55,200 50,900 63,400
NYM Extrana 4×1,5 mm2 m 11,000 11,900 12,000 12,800 13,200 14,500
NYM Extrana 4×2,5 mm2 m 17,000 17,900 17,700 20,200 19,900 23,800
NYM Extrana 4×4 mm2 m 27,000 28,400 29,200 28,600 31,900 37,800
NYM Extrana 4×6 mm2 m 38,000 40,700 42,200 44,500 43,300 45,600
NYM Extrana 4×10 mm2 m 63,000 67,400 70,600 67,400 68,000 79,400
NYY Extrana 2×1,5 mm2 m 12,500 13,100 13,400 13,500 13,500 15,900
NYY Extrana 2×2,5 mm2 m 14,500 15,400 15,400 16,200 17,300 19,900
NYY Extrana 2×4 mm2 m 18,500 20,400 20,200 22,000 22,000 25,700
NYY Extrana 2×6 mm2 m 25,000 27,300 28,000 28,800 27,800 31,500
NYY Extrana 2×10 mm2 m 33,000 36,000 35,000 37,300 35,300 41,900
NYY Extrana 2×16 mm2 m 42,000 44,500 45,800 45,800 49,100 51,700

366/396
NYY Extrana 2×25 mm2 m 60,000 64,200 62,400 68,400 63,000 75,600
NYY Extrana 2×35 mm2 m 75,000 81,000 81,800 81,800 78,800 99,800
NYY Extrana 2×50 mm2 m 97,000 101,900 106,700 103,800 112,500 118,300
NYY Extrana 2×70 mm2 m 132,000 138,600 142,600 145,200 142,600 167,600
NYY Extrana 2×95 mm2 m 180,000 198,000 199,800 198,000 207,000 237,600
NYY Extrana 2×120 mm2 m 225,000 247,500 240,800 247,500 263,300 276,800
NYY Extrana 3×1,5 mm2 m 14,000 15,100 14,700 15,800 16,800 18,800
NYY Extrana 3×2,5 mm2 m 17,000 17,900 18,000 18,900 18,200 23,500
NYY Extrana 3×4 mm2 m 24,500 26,000 27,400 26,000 25,700 30,900
NYY Extrana 3×6 mm2 m 30,000 33,000 32,100 35,400 35,400 39,000
NYY Extrana 3×10 mm2 m 40,000 42,000 42,000 46,000 46,000 52,400
NYY Extrana 3×16 mm2 m 50,000 53,500 52,000 58,000 53,000 60,500
NYY Extrana 3×25 mm2 m 76,000 79,800 79,800 90,400 79,800 94,200
NYY Extrana 3×35 mm2 m 100,000 108,000 110,000 110,000 113,000 140,000
NYY Extrana 3×50 mm2 m 125,000 131,300 130,000 135,000 132,500 160,000
NYY Extrana 3×70 mm2 m 175,000 192,500 196,000 208,300 196,000 224,000
NYY Extrana 3×95 mm2 m 235,000 249,100 244,400 251,500 277,300 326,700
NYY Extrana 3×120 mm2 m 290,000 307,400 307,400 345,100 307,400 365,400
NYY Extrana 3×150 mm2 m 350,000 378,000 367,500 374,500 371,000 437,500
NYY Extrana 3×185 mm2 m 430,000 468,700 477,300 511,700 464,400 550,400
NYY Extrana 3×240 mm2 m 570,000 598,500 592,800 604,200 684,000 786,600
NYY Extrana 3×300 mm2 m 705,000 761,400 761,400 768,500 782,600 958,800
NYY Extrana 4×1,5 mm2 m 16,000 17,400 17,100 17,900 18,400 21,100
NYY Extrana 4×2,5 mm2 m 20,000 22,000 21,000 23,000 21,600 25,000
NYY Extrana 4×4 mm2 m 29,000 31,900 31,000 33,100 33,100 36,800
NYY Extrana 4×6 mm2 m 36,000 39,600 37,400 38,900 38,900 48,200
NYY Extrana 4×10 mm2 m 49,000 53,400 51,000 56,400 56,800 66,600
NYY Extrana 4×16 mm2 m 65,000 69,600 67,600 74,100 77,400 91,000
NYY Extrana 4×25 mm2 m 95,000 101,700 103,600 108,300 108,300 117,800
NYY Extrana 4×35 mm2 m 125,000 131,300 130,000 145,000 141,300 151,300
NYY Extrana 4×50 mm2 m 165,000 181,500 179,900 196,400 174,900 209,600
NYY Extrana 4×70 mm2 m 225,000 243,000 240,800 245,300 263,300 288,000
NYY Extrana 4×95 mm2 m 305,000 335,500 323,300 359,900 366,000 411,800
NYY Extrana 4×120 mm2 m 380,000 406,600 418,000 437,000 433,200 520,600
NYY Extrana 4×150 mm2 m 465,000 511,500 488,300 553,400 497,600 576,600
NYY Extrana 4×185 mm2 m 580,000 632,200 614,800 614,800 609,000 719,200
NYY Extrana 4×240 mm2 m 755,000 807,900 823,000 868,300 898,500 943,800
NYY Extrana 4×300 mm2 m 935,000 1,028,500 991,100 1,094,000 1,075,300 1,168,800

367/396
31 POMPA AIR - - - - -
SHIMIZU PS-230 BIT-200 watt, Sumur Dangkal Unit 940,000 987,000 1,005,800 1,024,600 1,043,400 1,231,400
SHIMIZU PS-226 BIT-200 watt, Sumur Dangkal Unit 920,000 1,002,800 1,002,800 1,030,400 1,085,600 1,159,200
SHIMIZU PS-103 BIT-200 watt, Sumur Dangkal, Tertutup Unit 880,000 924,000 924,000 950,400 950,400 1,214,400
SHIMIZU Jet-100 BIT-100 watt, Semi Jet Unit 730,000 803,000 788,400 803,000 846,800 876,000
SHIMIZU PS 130 BIT-125 watt, Sumur Dangkal Unit 525,000 577,500 582,800 593,300 624,800 708,800
SHIMIZU PS 135 E-125 watt, Sumur Dangkal Unit 450,000 490,500 472,500 495,000 513,000 598,500
SHIMIZU PS 128 BIT-125 watt, Sumur Dangkal Unit 375,000 393,800 405,000 397,500 435,000 487,500
SHIMIZU PC-502 BIT-600 watt, Jet Pump, Unit 2,910,000 3,055,500 3,259,200 3,201,000 3,288,300 3,695,700
SHIMIZU PC-250 BIT-250 watt ,Jet Pump, Model Tutup Unit 2,360,000 2,548,800 2,501,600 2,548,800 2,572,400 3,209,600
SHIMIZU PC-375 BIT-375 watt , Jet Pump Unit 1,870,000 2,038,300 2,094,400 2,113,100 2,131,800 2,431,000
SHIMIZU PC-260 BIT-250 watt,  Jet Pump Unit 1,690,000 1,791,400 1,774,500 1,875,900 2,028,000 2,146,300
SANYO PH100-Sumur Dangkal, Tertutup Unit 860,000 920,200 911,600 980,400 963,200 1,066,400
SANYO PH236a-200 watt, Sumur Dangkal Unit 635,000 685,800 660,400 736,600 717,600 863,600
SANYO PWH 137-125 watt, Sumur Dangkal Unit 430,000 455,800 460,100 481,600 464,400 520,300
SANYO PDH-400-Jet Pump, Model Tutup Unit 8,685,000 9,379,800 9,293,000 10,074,600 9,119,300 10,769,400
SANYO PDS-255 A-250 watt, Pompa Jet Pump Unit 5,815,000 6,105,800 6,512,800 6,687,300 6,978,000 7,792,100
SANYO PH150-Sumur Dangkal, Tertutup Unit 985,000 1,044,100 1,073,700 1,132,800 1,054,000 1,231,300
SANYO PWH236-200 watt, Sumur Dangkal Unit 672,000 739,200 698,900 732,500 806,400 927,400
SANYO PH 137A-125 watt, Sumur Dangkal Unit 562,000 618,200 584,500 595,700 607,000 764,300
32 ENGSEL PINTU - - - - -
Engsel Binoche Premium 32525 2bb Sss unit 34,000 36,000 36,700 39,400 39,400 43,500
Engsel Pintu Stainless 3″ Ecoline Dekson unit 31,000 32,900 34,100 35,000 33,200 41,900
Engsel Pintu Stainless Steel 4x3x3mm 4bb unit 61,000 67,100 65,300 69,500 64,100 85,400
Engsel 4″ H 2bb Ecoline Dekson/ Engsel Aluminium Tanpa Coa unit 47,000 50,800 51,700 55,500 56,400 60,200
Engsel Pintu Stainles 4″Ecolen Dekson unit 41,000 43,500 43,500 45,500 47,600 55,400
Handle Pintu Sliding Arcel 628 Sss Sus 304 unit 245,000 262,200 264,600 272,000 267,100 308,700
Engsel Pintu Stainless Steel 3×2.5×2.5mm 2bb unit 41,000 44,300 45,100 48,000 48,400 56,600
Engsel Jendela Arcel Nrp 3″ Sss Sus 304 unit 46,000 48,800 50,600 54,700 50,100 64,400
Rel Pintu Geser Soligen J3 180 cm unit 183,000 194,000 197,600 205,000 201,300 252,500
Engsel Pintu Garasi Lipat Besi / Kayu Henderson unit 161,000 173,900 175,500 180,300 191,600 194,800
Engsel Pintu SOLID 4 inch Tebal 3 inch unit 28,000 30,500 29,700 31,400 31,100 36,700
Engsel Pintu Arcel Nrp 4″ Sss Sus 304 unit 53,000 58,300 56,700 59,900 56,200 65,200
Engsel Pintu Arcel Nrp 5″ Sss Sus 304 unit 75,000 81,000 78,000 88,500 78,800 104,300
Engsel Pintu Kupu Kupu 3″X2,5″X2 Mm 2bb Hampton unit 18,000 18,900 19,100 20,700 20,300 25,200
Body Kunci Arcel Full Sss Sus 304 unit 245,000 267,100 272,000 272,000 294,000 323,400
33 PIPA GALVANISH - - - - -
Pipa Hitam Medium / Galvanis Diameter 1/2 inch 7,3kg /Btg 63,000 67,400 67,400 70,600 67,400 82,500

368/396
Pipa Hitam Medium / Galvanis Diameter 3/4 inch 9,4kg /Btg 73,000 80,300 78,800 81,000 84,000 89,100
Pipa Hitam Medium / Galvanis Diameter 1 inch 14,6kg /Btg 123,000 134,100 129,200 142,700 140,200 168,500
Pipa Hitam Medium / Galvanis Diameter 1-1/4 inch 18,8kg /Btg 153,000 163,700 169,800 163,700 177,500 186,700
Pipa Hitam Medium / Galvanis Diameter 1-1/2 inch 21,6kg /Btg 187,000 202,000 207,600 216,900 200,100 230,000
Pipa Hitam Medium / Galvanis Diameter 2 inch 30,6kg /Btg 267,000 280,400 277,700 293,700 307,100 325,700
Pipa Hitam Medium / Galvanis Diameter 2-1/2 inch 39kg /Btg 332,000 361,900 361,900 381,800 391,800 448,200
Pipa Hitam Medium / Galvanis Diameter 3 inch 50,8kg /Btg 432,000 462,200 483,800 466,600 479,500 600,500
Pipa Hitam Medium / Galvaniz Diameter 4 inch 72,6kg /Btg 613,000 649,800 680,400 649,800 643,700 815,300
Pipa Hitam Medium / Galvaniz Diameter 5 inch 97,2kg /Btg 828,000 902,500 910,800 960,500 952,200 1,076,400
Pipa Hitam Medium / Galvaniz Diameter 6 inch 115,2kg /Btg 973,000 1,041,100 1,031,400 1,148,100 1,167,600 1,352,500
PLAT BJLS DAN SENG GELOMBANG - - - - -
PLAT BJLS GALVALUM, T0.4-1,219 x 1m x 4,12 kg M 118,000 125,100 132,200 127,400 123,900 152,200
PLAT BJLS GALVALUM, T0.5-1,219 x 1m x 5,08kg M 147,000 160,200 163,200 166,100 169,100 204,300
PLAT BJLS GALVALUM, T0.6-1,219 x 1m x 6,11 kg M 174,000 189,700 186,200 201,800 201,800 231,400
PLAT BJLS GALVALUM, T0.7-1,219 x 1m x 7,07 kg M 200,000 212,000 212,000 234,000 218,000 246,000
PLAT BJLS GALVALUM, T0.8-1,219 x 1m x 8,02 kg M 227,000 245,200 245,200 242,900 256,500 292,800
PLAT BJLS GALVALUM, T1-1,219 x 1m x 9,94 kg M 279,000 301,300 301,300 309,700 312,500 373,900
PLAT BJLS GALVALUM, T1.2-1,219 x 1m x 11,85 kg M 335,000 358,500 358,500 365,200 398,700 455,600
PLAT BJLS GALVALUM, T0.4-1,219 X 2,438 m x 10,05 kg  LBR 274,000 295,900 287,700 309,600 315,100 342,500
PLAT BJLS GALVALUM, T0.5-1,219 X 2,438 m x 12,38 kg  LBR 338,000 354,900 361,700 371,800 402,200 412,400
PLAT BJLS GALVALUM, T0.6-1,219 X 2,438 m x 14,9 kg  LBR 402,000 434,200 418,100 470,300 434,200 526,600
PLAT BJLS GALVALUM, T0.7-1,219 X 2,438 m x 17,23 kg  LBR 464,000 505,800 491,800 519,700 533,600 580,000
PLAT BJLS GALVALUM, T0.8-1,219 X 2,438 m x 19,57 kg  LBR 537,000 580,000 585,300 617,600 622,900 735,700
PLAT BJLS GALVALUM, T0.9-1,219 X 2,438 m x 21,9 kg  LBR 588,000 646,800 658,600 623,300 664,400 758,500
PLAT BJLS GALVALUM, T1-1,219 X 2,438 m x 24,23 kg  LBR 647,000 698,800 672,900 718,200 744,100 867,000
PLAT BJLS GALVALUM, T1.1-1,219 X 2,438 m x 26,56 kg  LBR 709,000 744,500 772,800 751,500 836,600 985,500
PLAT BJLS GALVALUM, T1.2-1,219 X 2,438 m x 28,9 kg  LBR 771,000 832,700 825,000 863,500 809,600 1,025,400
PLAT BJLS GALVALUM, T1.4-1,219 X 2,438 m x 33,56 kg  LBR 891,000 953,400 980,100 971,200 1,006,800 1,140,500
PLAT BJLS GALVALUM, T1.5-1,219 X 2,438 m x 35,9 kg  LBR 958,000 1,005,900 1,005,900 1,140,000 1,111,300 1,245,400
PLAT BJLS GALVALUM, T1.6-1,219 X 2,438 m x 38,23 kg  LBR 1,020,000 1,071,000 1,142,400 1,183,200 1,162,800 1,377,000
PLAT BJLS GALVALUM, T0.4-1,219 x 25 m  ROLL 294,000 323,400 317,500 326,300 326,300 391,000
PLAT BJLS GALVALUM, T0.5-1,219 x 25 m  ROLL 3,600,000 3,924,000 3,924,000 4,212,000 3,816,000 4,968,000
PLAT BJLS GALVALUM, T0.6-1,219 x 25 m  ROLL 4,300,000 4,730,000 4,515,000 4,988,000 4,601,000 5,160,000
PLAT BJLS GALVALUM, T0.7-1,219 x 25 m  ROLL 4,950,000 5,247,000 5,395,500 5,494,500 5,593,500 6,831,000
PLAT BJLS GALVALUM, T0.8-1,219 x 25 m  ROLL 5,700,000 6,042,000 5,928,000 6,042,000 6,156,000 7,524,000
PLAT BJLS GALVALUM, T1-1,219 x 25 m  ROLL 7,000,000 7,490,000 7,770,000 7,560,000 8,120,000 8,960,000
PLAT BJLS GALVALUM, T1.2-1,219 x 25 m  ROLL 8,300,000 9,130,000 9,213,000 9,047,000 8,798,000 10,541,000
SENG GELOMBANG  BJLS GAJAH SURYA–-0.20 mm x 1,8 m x 80 cm
 LBR 47,000 49,400 50,800 55,900 55,500 61,100

369/396
SENG GELOMBANG  BJLS GAJAH SURYA–-0,25 mm  x  180 cm  LBR 61,000 66,500 64,700 68,900 66,500 83,000
SENG GELOMBANG  BJLS GAJAH SURYA–-0,25 mm x 210 cm  LBR 70,000 74,200 78,400 80,500 79,100 97,300
SENG GELOMBANG  BJLS GAJAH SURYA–-0,25 mm x 240 cm  LBR 81,000 85,100 85,100 94,800 86,700 111,000
SENG GELOMBANG  BJLS GAJAH SURYA–-0,25 mm x 300 cm  LBR 102,000 112,200 114,200 118,300 113,200 133,600
SENG GELOMBANG  BJLS GAJAH SURYA–-0,3 mm x 180 cm  LBR 69,000 75,900 73,100 75,900 75,900 84,900
SENG GELOMBANG  BJLS GAJAH SURYA–-0,3 mm x 210 cm  LBR 81,000 86,700 84,200 94,800 88,300 103,700
SENG GELOMBANG  BJLS GAJAH SURYA–-0,3 mm x 240 cm  LBR 91,000 98,300 95,600 107,400 96,500 120,100
SENG GELOMBANG  BJLS GAJAH SURYA–-0,3 mm x 300 cm  LBR 116,000 124,100 125,300 136,900 123,000 148,500
Plat Galvalum BJLS1,219 x 1m x 4,12 kg M 120,000 128,400 127,200 132,000 129,600 151,200
Plat Galvalum BJLS1,219 x 1m x 5,08kg M 150,000 157,500 156,000 172,500 169,500 198,000
Plat Galvalum BJLS1,219 x 1m x 6,11 kg M 174,000 189,700 182,700 186,200 184,400 222,700
Plat Galvalum BJLS1,219 x 1m x 7,07 kg M 201,000 213,100 223,100 219,100 211,100 261,300
Plat Galvalum BJLS1,219 x 1m x 7,52 kg M 217,000 238,700 236,500 247,400 240,900 303,800
Plat Galvalum BJLS1,219 x 1m x 8,02 kg M 228,000 250,800 237,100 250,800 269,000 273,600
Plat Galvalum BJLS1,219 x 1m x 9,01 kg M 246,000 268,100 268,100 263,200 295,200 324,700
Plat Galvalum BJLS1,219 x 1m x 9,94 kg M 280,000 296,800 302,400 305,200 336,000 350,000
Plat Galvalum BJLS1,219 x 25 m  ROLL 2,940,000 3,145,800 3,145,800 3,234,000 3,234,000 3,616,200
Plat Galvalum BJLS1,219 x 25 m  ROLL 3,670,000 4,037,000 4,037,000 4,073,700 4,073,700 4,440,700
Plat Galvalum BJLS1,219 x 25 m  ROLL 4,233,000 4,614,000 4,402,300 4,910,300 4,952,600 5,799,200
Plat Galvalum BJLS1,219 x 25 m  ROLL 5,000,000 5,250,000 5,250,000 5,950,000 5,800,000 6,250,000
Plat Galvalum BJLS1,219 x 25 m  ROLL 5,200,000 5,564,000 5,460,000 5,772,000 5,772,000 6,448,000
Plat Galvalum BJLS1,219 x 25 m  ROLL 5,600,000 6,048,000 5,824,000 6,496,000 6,104,000 7,336,000
Plat Galvalum BJLS1,219 x 25 m  ROLL 5,800,000 6,148,000 6,032,000 6,844,000 6,902,000 7,366,000
Plat Galvalum BJLS1,219 x 25 m  ROLL 7,000,000 7,420,000 7,770,000 7,630,000 7,630,000 9,450,000
Plat Galvalum BJLS1,219 x 25 m  ROLL 7,300,000 7,957,000 7,957,000 7,738,000 8,249,000 10,001,000
Plat Galvalum BJLS1,219 x 25 m  ROLL 8,300,000 9,130,000 8,715,000 9,545,000 9,794,000 10,126,000
Plat Galvalum BJLS1,219 x 1m x 10,75 kg M 293,000 310,600 325,200 331,100 331,100 401,400
Plat Galvalum BJLS1,219 x 1m x 11,85 kg M 335,000 351,800 368,500 371,900 368,500 412,100
Plat Galvalum BJLS1,219 X 2,438 m x 10,05 kg  LBR 274,000 301,400 293,200 306,900 323,300 361,700
Plat Galvalum BJLS1,219 X 2,438 m x 12,38 kg  LBR 338,000 368,400 365,000 385,300 354,900 412,400
Plat Galvalum BJLS1,219 X 2,438 m x 14,9 kg  LBR 402,000 430,100 434,200 438,200 434,200 502,500
Plat Galvalum BJLS1,219 X 2,438 m x 17,23 kg  LBR 463,000 500,000 490,800 546,300 541,700 629,700
Plat Galvalum BJLS1,219 X 2,438 m x 18,40 kg  LBR 488,000 512,400 541,700 571,000 580,700 590,500
Plat Galvalum BJLS1,219 X 2,438 m x 19,57 kg  LBR 535,000 567,100 588,500 588,500 626,000 733,000
Plat Galvalum BJLS1,219 X 2,438 m x 21,9 kg  LBR 599,000 640,900 634,900 688,900 652,900 730,800
Plat Galvalum BJLS1,219 X 2,438 m x 24,23 kg  LBR 650,000 695,500 721,500 754,000 728,000 903,500
Plat Galvalum BJLS1,219 X 2,438 m x 26,56 kg  LBR 709,000 779,900 758,600 772,800 787,000 992,600
Plat Galvalum BJLS1,219 X 2,438 m x 28,9 kg  LBR 778,000 824,700 832,500 886,900 925,800 949,200

370/396
Plat Galvalum BJLS1,219 X 2,438 m x 33,56 kg  LBR 899,000 952,900 988,900 961,900 979,900 1,231,600
Plat Galvalum BJLS1,219 X 2,438 m x 35,9 kg  LBR 958,000 1,044,200 1,053,800 1,025,100 1,101,700 1,274,100
Plat Galvalum BJLS1,219 X 2,438 m x 38,23 kg  LBR 1,021,000 1,112,900 1,123,100 1,194,600 1,112,900 1,398,800
Seng Gelombang BJLS Gajah Surya0.20 mm x 1,8 m x 80 cm  LBR 48,000 50,900 49,900 52,800 55,200 59,000
Seng Gelombang BJLS Gajah Surya0,25 mm  x  180 cm  LBR 61,000 64,700 64,100 65,900 67,700 81,100
Seng Gelombang BJLS Gajah Surya0,25 mm x 210 cm  LBR 70,000 75,600 77,700 75,600 77,000 91,000
Seng Gelombang BJLS Gajah Surya0,25 mm x 240 cm  LBR 80,000 84,000 88,000 88,000 88,800 98,400
Seng Gelombang BJLS Gajah Surya0,25 mm x 300 cm  LBR 100,000 105,000 104,000 117,000 110,000 123,000
Seng Gelombang BJLS Gajah Surya0,3 mm x 180 cm  LBR 69,000 73,100 77,300 73,100 77,300 95,200
Seng Gelombang BJLS Gajah Surya0,3 mm x 210 cm  LBR 81,000 88,300 84,200 95,600 96,400 101,300
Seng Gelombang BJLS Gajah Surya0,3 mm x 240 cm  LBR 91,000 95,600 98,300 103,700 98,300 118,300
Seng Gelombang BJLS Gajah Surya0,3 mm x 300 cm  LBR 115,000 120,800 119,600 121,900 136,900 140,300
34 GRANIT MARMER - - - - -
Solfen Lappato - - - - -
Surface lappato ocra 40 x 40 m2 209,000 219,500 223,600 236,200 236,200 267,500
Surface lappato pearl 30 x 60 m2 229,000 247,300 245,000 270,200 240,500 286,300
Surface lappato shade 60 x 60 m2 229,000 240,500 240,500 245,000 247,300 309,200
Surface lappato laterite 40 x 40 m2 249,000 266,400 276,400 268,900 276,400 336,200
Surface lappato coal 60 x 60 m2 269,000 290,500 295,900 304,000 312,000 322,800
Yura - - - - -
Surface matt snow 40 x 40 m2 250,000 265,000 260,000 275,000 280,000 322,500
Surface matt ivory 30 x 60 m2 250,000 267,500 267,500 275,000 275,000 312,500
Surface matt foggy 60 x 60 m2 250,000 272,500 270,000 265,000 285,000 332,500
Nordik Stone - - - - -
Surface matt blizzard 30 x 60 m2 180,000 198,000 189,000 203,400 212,400 250,200
Surface matt bora, fohn, kosawa, mistral 60 x 60 m2 180,000 189,000 201,600 194,400 214,200 244,800
Veinstone Matt - - - - -
Surface matt beige 30 x 60 m2 250,000 275,000 272,500 270,000 280,000 310,000
Surface matt brown, black, grey 60 x 60 m2 250,000 272,500 270,000 292,500 297,500 345,000
Veinstone Lappato - - - - -
Surface lappato beige 30 x 60 m2 280,000 302,400 296,800 316,400 296,800 392,000
Surface lappato brown, black, grey 60 x 60 m2 280,000 294,000 291,200 330,400 330,400 341,600
Megalito - - - - -
Surface structured bianco 30 x 60 m2 188,000 203,000 195,500 203,000 225,600 259,400
Surface structured marrone, nero grigio 60 x 60 m2 280,000 308,000 302,400 310,800 299,600 364,000
Shavings - - - - -
Surface matt treasure, antique, heritage, mystery 15 x 60 m2 280,000 299,600 294,000 310,800 319,200 380,800
Solfen Matt - - - - -

371/396
Surface matt ocra 40 x 40 m2 149,000 156,500 159,400 171,400 157,900 187,700
Surface matt pearl 30 x 60 m2 169,000 177,500 175,800 182,500 184,200 226,500
Surface matt shade 60 x 60 m2 169,000 182,500 187,600 184,200 202,800 212,900
Surface matt laterite 40 x 40 m2 189,000 202,200 211,700 219,200 202,200 245,700
Surface matt coal 60 x 60 m2 209,000 225,700 227,800 223,600 248,700 265,400
35 BATA RINGAN - - - - -
Bata Ringan Brix m3 706,000 748,400 769,500 833,100 741,300 967,200
Bata Ringan Priority One m3 709,000 779,900 737,400 808,300 850,800 943,000
Bata Ringan Voscon m3 650,000 682,500 715,000 689,000 721,500 903,500
Bata Ringan 10x20x60cm buah 10,100 10,800 10,700 11,600 12,000 12,300
Bata Ringan 7,5x20x60cm buah 7,800 8,200 8,500 8,700 8,300 9,800
Bata Ringan 10x20x60cm m3 750,000 825,000 795,000 862,500 795,000 990,000
Bata Ringan 7,5x20x60cm m3 585,000 626,000 620,100 631,800 661,100 725,400
Bata Ringan Hebel m3 740,000 777,000 821,400 865,800 806,600 954,600
Bata Ringan Citicon m3 780,000 834,600 826,800 920,400 865,800 943,800
Bata Ringan Grand Elephant m3 735,000 793,800 779,100 860,000 808,500 940,800
Bata Ringan Gracon m3 700,000 763,000 749,000 812,000 784,000 931,000
36 HPL - - - - -
Taco HPL-AA / B / H Putih Lembar 95,000 100,700 101,700 111,200 110,200 120,700
Taco HPL-AA / B / H Polos Lembar 115,000 126,500 124,200 135,700 134,600 156,400
Taco HPL-AA / B / H Warna Kayu Lembar 140,000 152,600 152,600 151,200 152,600 177,800
Taco HPL-AD / G Dove Polos Lembar 129,000 140,600 135,500 136,700 143,200 170,300
Taco HPL-D / G Gloss Polos Lembar 130,000 136,500 145,600 150,800 148,200 156,000
Taco HPL-Solid Brush Lembar 206,000 216,300 218,400 230,700 224,500 267,800
Taco HPL-Tekture Lembar 207,000 221,500 229,800 246,300 246,300 281,500
Taco HPL-New Texture Lembar 205,000 217,300 215,300 219,400 227,600 258,300
Taco HPL-Vir Line Lembar 208,000 220,500 230,900 224,600 220,500 287,000
Taco HPL-Floral (BU) Lembar 204,000 214,200 216,200 216,200 230,500 244,800
TACO-ASIAN OAK – TH 262 B – WOODGRAIN Lembar 165,000 174,900 179,900 191,400 179,900 212,900
TACO-LIGHT GREY GLOSS – TH 014 G Lembar 176,000 190,100 186,600 198,900 193,600 242,900
TACO-SAGRADA – TH 1241 FC – PATTERN Lembar 184,000 195,000 200,600 211,600 193,200 257,600
TACO-LIGHT PESARO – TH 864 JG – WOODGRAIN GLOS Lembar 207,000 217,400 225,600 233,900 238,100 269,100
TACO-GOLDEN FOIL – TH 610 AL – PATTERN TEXTURE Lembar 255,000 270,300 275,400 303,500 300,900 346,800
ECO-WOODGRAIN ECO 001 Lembar 115,000 125,400 124,200 131,100 120,800 140,300
ECO-WOODGRAIN ECO P 042 Lembar 117,000 122,900 129,900 131,000 134,600 155,600
ECO-SOLID ECO 006 Lembar 111,000 117,700 115,400 122,100 133,200 138,800
ECO-WOODGRAIN ECO P 058 RL Lembar 156,000 170,000 170,000 179,400 165,400 216,800
APP TIMBER-H NATURAL ZEBRAWOOD (SUEDE) Lembar 200,000 212,000 216,000 220,000 230,000 280,000

372/396
APP TIMBER-FUMED MAPLE (RAW VENEER) Lembar 273,000 294,800 305,800 305,800 327,600 354,900
37 BATU ALAM/BATU PARAS - - - - -
Andesit Bintik Bakar-15×30 m2 91,000 100,100 95,600 103,700 103,700 121,900
Andesit Bintik Bakar-20×40 m2 96,000 101,800 102,700 105,600 106,600 120,000
Andesit Bintik Bakar-30×30 m2 111,000 119,900 123,200 122,100 118,800 154,300
Andesit Bintik Bakar-30×60 m2 106,000 115,500 110,200 112,400 124,000 148,400
Candi Merah-30×30 m2 111,000 118,800 118,800 123,200 133,200 139,900
Candi Merah-30×60 m2 121,000 127,100 128,300 140,400 137,900 165,800
Candi Hitam Yogyakarta-10×20 m2 106,000 115,500 115,500 121,900 127,200 127,200
Candi Hitam Yogyakarta-15×15 m2 112,000 121,000 118,700 119,800 127,700 156,800
Candi Hitam Yogyakarta-15×30 m2 106,000 114,500 110,200 121,900 118,700 139,900
Candi Hitam Yogyakarta-20×20 m2 111,000 116,600 117,700 119,900 121,000 155,400
Batu Alam Cupang Merah-10×20 m2 101,000 107,100 110,100 111,100 119,200 124,200
Batu Alam Cupang Merah-15×15 m2 101,000 110,100 105,000 111,100 107,100 128,300
Andesit Bintik Bakar-40×40 m2 116,000 126,400 128,800 125,300 127,600 139,200
Andesit Bintik Bakar-40×60 m2 140,000 147,000 155,400 151,200 158,200 169,400
Andesit Bintik Bakar-50×50 m2 156,000 170,000 162,200 181,000 182,500 215,300
Andesit Bintik Bakar-60×60 m2 186,000 195,300 200,900 215,800 212,000 230,600
Andesit Polos Bakar-15×30 m2 86,000 90,300 92,900 94,600 94,600 104,900
Andesit Polos Bakar-20×40 m2 91,000 99,200 96,500 105,600 106,500 111,900
Andesit Polos Bakar-30×30 m2 96,000 104,600 102,700 101,800 110,400 118,100
Andesit Polos Bakar-30×60 m2 101,000 107,100 112,100 110,100 113,100 123,200
Andesit Polos Bakar-40×40 m2 111,000 121,000 124,300 124,300 133,200 135,400
Andesit Polos Bakar-40×60 m2 131,000 137,600 140,200 153,300 141,500 162,400
Andesit Polos Bakar-50×50 m2 151,000 161,600 160,100 167,600 178,200 181,200
Andesit Polos Bakar-60×60 m2 181,000 191,900 197,300 215,400 202,700 233,500
Andesit Susun Sirih-3×30 m2 71,000 76,000 78,800 79,500 78,100 86,600
Andesit Susun Sirih-3×40 m2 82,000 86,100 87,700 93,500 94,300 107,400
Andesit Susun Sirih-5×30 m2 66,000 72,600 70,600 70,000 76,600 87,800
Andesit Susun Sirih-5×40 m2 76,000 82,800 82,800 84,400 79,800 102,600
Candi Merah-10×20 m2 86,000 94,600 90,300 98,000 90,300 113,500
Candi Merah-15×15 m2 86,000 90,300 92,900 94,600 92,900 113,500
Candi Merah-15×30 m2 96,000 104,600 101,800 109,400 100,800 126,700
Candi Merah-20×40 m2 101,000 109,100 108,100 117,200 120,200 134,300
Batu Alam Cupang Merah-15×30 m2 111,000 118,800 124,300 126,500 131,000 147,600
Batu Alam Cupang Merah-20×40 m2 121,000 131,900 125,800 134,300 135,500 158,500
Batu Alam Cupang Merah-30×30 m2 141,000 153,700 156,500 152,300 163,600 173,400
38 ATAP FIBER DAN ATAP TRANSPARAN - - - - -

373/396
Solar Tuff Lebar 75cm, Tebal 0.8 mm lbr 136,000 149,600 152,300 145,500 144,200 186,300
Solar Tuff Lebar 75cm, Tebal 0.8 mm lbr 244,000 256,200 273,300 290,400 283,000 309,900
Solar Tuff Lebar 75cm, Tebal 0.8 mm lbr 325,000 357,500 364,000 383,500 364,000 438,800
Solar Tuff Lebar 75cm, Tebal 0.8 mm lbr 405,000 425,300 449,600 445,500 473,900 530,600
Solar Tuff Lebar 75cm, Tebal 0.8 mm lbr 486,000 520,000 510,300 549,200 558,900 597,800
Solar Tuff Lebar 75cm, Tebal 0.8 mm lbr 568,000 607,800 619,100 647,500 630,500 761,100
Solar Tuff Lebar 75cm, Tebal 0.8 mm lbr 812,000 877,000 909,400 966,300 877,000 1,136,800
Seng Plastik Puso, Tebal 0.6 mm 150×80 lbr 43,000 46,400 48,200 46,000 50,700 56,800
Seng Plastik Puso, Tebal 0.6 mm 180×80 lbr 59,000 63,100 64,300 62,500 62,000 77,300
Seng Plastik Puso, Tebal 0.6 mm 210×80 lbr 55,000 60,500 59,400 64,400 58,900 69,300
Seng Plastik Puso, Tebal 0.6 mm 240×80 lbr 61,000 64,700 64,100 69,500 65,900 84,200
Seng Plastik Puso, Tebal 0.6 mm 270×80 lbr 66,000 72,600 73,900 73,300 70,000 81,800
Seng Plastik Puso, Tebal 0.6 mm 300×80 lbr 76,000 79,800 82,100 82,100 81,300 104,900
Seng Fiber Lebar 75cm, Tebal 1 mm 1.8 meter lbr 100,000 106,000 106,000 107,000 113,000 135,000
39 ACCESORIS PINTU - - - - -
Alessa Rosette Seri 9 R-09006-100-L-01 Full Set Door Handle Unit 356,000 380,900 395,200 380,900 388,000 477,000
Alessa Rosette Seri 9 R-09005-100-L-01 Full Set Door Handle Unit 356,000 377,400 373,800 416,500 377,400 430,800
Alessa Rosette Seri 9 R-09002-100-L-01 Full Set Door Handle Unit 356,000 391,600 377,400 398,700 423,600 448,600
Alessa Rosette Seri 9 R-09003-100-L-01 Full Set Door Handle Unit 356,000 377,400 398,700 384,500 395,200 459,200
Alessa Seri 9 09010 Full Set Door Handle Gagang Pintu Unit 356,000 377,400 370,200 416,500 398,700 459,200
Alessa Seri 9 09005 Full Set Door Handle Gagang Pintu Unit 356,000 384,500 370,200 420,100 423,600 466,400
Alessa Seri 9 09003 Full Set Door Handle Gagang Pintu Unit 256,000 279,000 284,200 294,400 302,100 312,300
Alessa Seri 9 09015 Full Set Door Handle Gagang Pintu Unit 356,000 380,900 377,400 420,100 395,200 455,700
Alessa Rosette Seri 9 R-09009-100-L-01 Full Set Door Handle Unit 357,000 392,700 399,800 392,700 421,300 442,700
Bossini Rose SN-CP Kunci Pintu Unit 174,000 184,400 181,000 196,600 201,800 215,800
Bossini Jasmine SN-CP Kunci Pintu Unit 174,000 186,200 193,100 186,200 205,300 219,200
Bossini Lotus SN-CP Kunci Pintu Unit 174,000 184,400 189,700 184,400 208,800 226,200
Bossini 2189 CP Champagne Pull Handle Gagang Pintu + Ring Unit 216,000 233,300 229,000 231,100 239,800 270,000
Bossini 2199 CP BN Pull Handle Gagang Pintu + Ring Unit 216,000 229,000 239,800 241,900 235,400 274,300
Bossini 2189 GP BN Pull Handle Gagang Pintu + Ring Unit 216,000 226,800 241,900 241,900 229,000 276,500
Bossini 2199 CP Red Pull Handle Gagang Pintu + Ring Unit 216,000 231,100 241,900 231,100 250,600 289,400
Bossini 2189 CP Red Pull Handle Gagang Pintu + Ring Unit 216,000 233,300 226,800 257,000 257,000 259,200
Bossini SSS Bulat Kunci Pintu Unit 70,000 77,000 77,000 74,900 76,300 91,000
Bossini Rose SN-CP Kunci Pintu Unit 174,000 191,400 186,200 201,800 191,400 229,700
Bossini Jasmine SN-CP Kunci Pintu Unit 174,000 186,200 189,700 191,400 207,100 215,800
Bossini Lotus SN-CP Kunci Pintu Unit 174,000 187,900 194,900 191,400 205,300 219,200
Bossini 2189 CP Champagne Pull Handle Gagang Pintu + Ring Unit 216,000 231,100 229,000 235,400 257,000 289,400
Bossini 2199 CP BN Pull Handle Gagang Pintu + Ring Unit 216,000 226,800 235,400 248,400 254,900 270,000

374/396
Bossini 2189 GP BN Pull Handle Gagang Pintu + Ring Unit 216,000 226,800 231,100 237,600 257,000 270,000
Bossini 2199 CP Red Pull Handle Gagang Pintu + Ring Unit 216,000 226,800 224,600 241,900 233,300 278,600
Bossini 2189 CP Red Pull Handle Gagang Pintu + Ring Unit 216,000 231,100 239,800 239,800 226,800 259,200
Bossini SSS Bulat Kunci Pintu Unit 70,000 73,500 74,900 75,600 77,000 93,800
Yale Digital Look YDM 4109 Black Silver Kunci Pintu Otomati Unit 6,270,000 6,708,900 6,708,900 6,959,700 6,771,600 8,276,400
Yale YTL 060 Paket Set 5 in 1 Unit 480,000 504,000 499,200 528,000 523,200 614,400
Yale YTL 070 Paket Set 5 in 1 Unit 480,000 508,800 513,600 513,600 547,200 672,000
Yale Knob VCA 5127 US 32 D Stainless set Kunci Pintu Unit 167,000 183,700 175,400 192,100 180,400 223,800
Yale YTL 010 Paket Set 5 in 1 Unit 480,000 528,000 513,600 566,400 532,800 643,200
Yale Digital Look YDM 3109 Black Silver Kunci Pintu Otomati Unit 5,300,000 5,830,000 5,724,000 5,777,000 6,148,000 7,102,000
P64.11 – 600 mm – Stainless Steel SUS 304 Unit 293,000 316,400 319,400 348,700 342,800 401,400
P64.10 – 500 mm – Stainless Steel SUS 304 Unit 340,000 367,200 370,600 384,200 408,000 462,400
P64.09 – 600 mm – Stainless Steel SUS 304 Unit 297,000 317,800 326,700 326,700 314,800 389,100
P64.08 – 600 mm – Stainless Steel SUS 304 Unit 395,000 418,700 426,600 466,100 430,600 505,600
P64.07 – 600 mm – Stainless Steel SUS 304 Unit 306,000 321,300 327,400 361,100 367,200 388,600
P64.06 – 600 mm – Stainless Steel SUS 304 Unit 350,000 381,500 367,500 385,000 402,500 423,500
P64.13 – 300 mm – Stainless Steel SUS 304 Unit 295,000 324,500 312,700 330,400 318,600 404,200
PR62.11 – 270 mm – Stainless Steel SUS 304 Unit 415,000 456,500 435,800 473,100 498,000 543,700
PR62.10 – 300 mm – Stainless Steel SUS 304 Unit 415,000 448,200 460,700 473,100 456,500 531,200
PR61.88 – 300 mm – Stainless Steel SUS 304 Unit 260,000 280,800 270,400 275,600 291,200 340,600
PR61.76 – 305 mm – Stainless Steel SUS 304 Unit 282,000 298,900 304,600 318,700 310,200 389,200
PR61.69 – 300 mm – Stainless Steel SUS 304 Unit 343,000 370,400 363,600 394,500 373,900 432,200
PR61.47 – 205 mm – Stainless Steel SUS 304 Unit 140,000 147,000 151,200 148,400 156,800 182,000
P511.12 – 450 mm – Stainless Steel SUS 304 Unit 315,000 330,800 343,400 368,600 356,000 412,700
P511.11 – 450 mm – Stainless Steel SUS 304 Unit 296,000 322,600 313,800 319,700 313,800 384,800
P511.09 – 310 mm – Stainless Steel SUS 304 Unit 292,000 309,500 315,400 312,400 318,300 379,600
P511.08 – 310 mm – Stainless Steel SUS 304 Unit 293,000 316,400 307,700 342,800 345,700 351,600
PR511.07 – 280 mm – Stainless Steel SUS 304 Unit 449,000 471,500 502,900 525,300 498,400 628,600
PR511.06 – 260 mm – Stainless Steel SUS 304 Unit 263,000 276,200 278,800 297,200 299,800 320,900
PR511.05 – 310 mm – Stainless Steel SUS 304 Unit 500,000 545,000 545,000 585,000 580,000 690,000
PR511.04 – 285 mm – Stainless Steel SUS 304 Unit 450,000 490,500 486,000 508,500 531,000 603,000
P511.03 – 340 mm – Stainless Steel SUS 304 Unit 450,000 490,500 490,500 517,500 535,500 603,000
P511.01 – 235 mm – Stainless Steel SUS 304 Unit 230,000 253,000 255,300 259,900 248,400 278,300
P91.07 – 300 mm – Stainless Steel SUS 304 Unit 225,000 245,300 245,300 261,000 238,500 281,300
P91.06 – 300 mm – Stainless Steel SUS 304 Unit 195,000 210,600 208,700 210,600 234,000 236,000
P91.05 – 300 mm – Stainless Steel SUS 304 Unit 220,000 233,200 228,800 257,400 259,600 277,200
P91.04 – 300 mm – Stainless Steel SUS 304 Unit 195,000 208,700 204,800 214,500 224,300 259,400
P91.03 – 300 mm – Stainless Steel SUS 304 Unit 195,000 210,600 208,700 222,300 218,400 255,500

375/396
P64.4 – 1200 mm – Stainless Steel SUS 304 Unit 593,000 646,400 664,200 693,800 676,000 776,800
P64.43 – 1200 mm – Stainless Steel SUS 304 Unit 578,000 606,900 612,700 653,100 624,200 745,600
P64.42 – 1200 mm – Stainless Steel SUS 304 Unit 578,000 606,900 647,400 647,400 664,700 786,100
P64.41 – 1200 mm – Stainless Steel SUS 304 Unit 654,000 719,400 686,700 732,500 739,000 797,900
PR68.01 – 600 mm – Stainless Steel Unit 410,000 434,600 459,200 459,200 451,000 524,800
P64.31 – 600 mm – Stainless Steel Unit 299,000 328,900 322,900 322,900 314,000 412,600
40 PAKU - - - - -
Paku Beton 2,5 cm (Hitam) Kg 38,000 41,000 41,800 41,000 41,400 52,100
Paku Beton 3 cm (Hitam) Kg 38,000 41,800 42,600 41,800 41,400 49,000
Paku Beton 4 cm (Hitam) Kg 38,000 40,300 39,900 43,700 43,700 47,500
Paku Beton 5 cm (Hitam) Kg 38,000 39,900 40,300 43,300 42,900 46,700
Paku Kayu 6 cm (Hitam) Kg 36,000 39,600 37,400 41,400 43,200 49,300
Paku Kayu 7 cm (Hitam) Kg 36,000 38,200 40,300 39,600 41,400 50,000
Paku Kayu 10 cm (Hitam) Kg 36,000 38,900 37,800 41,800 37,800 49,700
Paku Kayu 12,5 cm (Hitam) Kg 36,000 39,600 38,500 42,100 42,500 44,600
Paku Beton 3 cm (Putih Kg 20,000 22,000 21,400 23,200 21,000 27,600
Paku Beton 5 cm (Putih Kg 19,000 20,100 21,300 21,700 21,900 25,500
Paku Beton 7 cm (Putih Kg 17,000 18,500 17,900 18,700 19,900 20,600
Paku Payung/Seng 7 cm Kg 28,000 29,700 31,100 30,500 30,000 37,000
Paku Payung/Seng 10 cm Kg 34,000 37,400 36,700 38,100 39,800 43,500
41 BESI PELAT - - - - -
Besi Plat Hitam t = 2,00 mm uk. 4’x8′ Lembar 480,000 504,000 528,000 556,800 576,000 667,200
Besi Plat Hitam t = 2,30 mm uk. 4’x8′ Lembar 555,000 588,300 588,300 616,100 588,300 754,800
Besi Plat Hitam t = 2,50 mm uk. 4’x8′ Lembar 595,000 636,700 660,500 678,300 666,400 791,400
Besi Plat Hitam t = 2,60 mm uk. 4’x8′ Lembar 635,500 673,600 711,800 724,500 667,300 838,900
Besi Plat Hitam t = 2,80 mm uk. 4’x8′ Lembar 680,000 714,000 727,600 761,600 748,000 911,200
Besi Plat Hitam t = 3,00 mm uk. 4’x8′ Lembar 715,000 765,100 793,700 757,900 858,000 865,200
Besi Plat Hitam t = 3,20 mm uk. 4’x8′ Lembar 765,000 841,500 841,500 902,700 902,700 1,071,000
Besi Plat Hitam t = 4,00 mm uk. 4’x8′ Lembar 955,000 1,002,800 1,041,000 1,069,600 1,107,800 1,279,700
Besi Plat Hitam t = 4,50 mm uk. 4’x8′ Lembar 1,100,000 1,166,000 1,188,000 1,287,000 1,232,000 1,364,000
Besi Plat Hitam t = 5,00 mm uk. 4’x8′ Lembar 1,200,000 1,308,000 1,260,000 1,356,000 1,416,000 1,452,000
Besi Plat Hitam t = 6,00 mm uk. 4’x8′ Lembar 1,400,000 1,526,000 1,470,000 1,568,000 1,596,000 1,848,000
Besi Plat Hitam t = 8,00 mm uk. 4’x8′ Lembar 1,880,000 1,992,800 2,030,400 2,105,600 1,992,800 2,613,200
Besi Plat Hitam t = 9,00 mm uk. 4’x8′ Lembar 2,175,000 2,349,000 2,370,800 2,544,800 2,283,800 2,827,500
Besi Plat Hitam t = 10,00 mm uk. 4’x8′ Lembar 2,350,000 2,467,500 2,538,000 2,491,000 2,585,000 3,172,500
Besi Plat Hitam t = 12,00 mm uk. 4’x8′ Lembar 2,875,000 3,105,000 3,191,300 3,392,500 3,421,300 3,622,500
Besi Plat Hitam t = 15,00 mm uk. 4’x8′ Lembar 3,600,000 3,960,000 3,852,000 4,248,000 4,320,000 4,500,000
Besi Plat Hitam t = 16,00 mm uk. 4’x8′ Lembar 3,800,000 4,066,000 4,066,000 4,522,000 4,104,000 4,674,000

376/396
Besi Plat Hitam t = 18,00 mm uk. 4’x8′ Lembar 4,300,000 4,730,000 4,601,000 4,859,000 4,601,000 5,762,000
Besi Plat Hitam t = 19,00 mm uk. 4’x8′ Lembar 4,500,000 4,770,000 4,905,000 4,815,000 4,725,000 5,940,000
Besi Plat Hitam t = 20,00 mm uk. 4’x8′ Lembar 4,730,000 4,966,500 5,203,000 5,581,400 4,966,500 6,574,700
Besi Plat Hitam t = 22,00 mm uk. 4’x8′ Lembar 5,200,000 5,720,000 5,824,000 6,084,000 5,772,000 6,916,000
Besi Plat Hitam t = 25,00 mm uk. 4’x8′ Lembar 5,900,000 6,490,000 6,372,000 7,021,000 6,313,000 7,552,000
42 BESI CHANEL CNP - - - - -
Besi CNP 100 x 50 x 20 t.2,3 mm-24,36 kg Btg/6m 240,000 254,400 261,600 256,800 271,200 326,400
Besi CNP 100 x 50 x 20 t.3,2 mm-33,00 kg Btg/6m 301,500 331,700 313,600 322,600 343,700 392,000
Besi CNP 125 x 50 x 20 t.2,3 mm-27,06 kg Btg/6m 265,000 283,600 278,300 307,400 283,600 328,600
Besi CNP 125 x 50 x 20 t.3,2 mm-36,78 kg Btg/6m 353,500 371,200 371,200 403,000 403,000 470,200
Besi CNP 150 x 50 x 20 t.2,3 mm-29,76 kg Btg/6m 288,500 308,700 300,000 323,100 326,000 354,900
Besi CNP 150 x 50 x 20 t.3,2 mm-40,56 kg Btg/6m 390,000 409,500 425,100 452,400 456,300 487,500
Besi CNP 150 x 65 x 20 t.2,3 mm-33,00 kg Btg/6m 308,500 333,200 320,800 367,100 342,400 407,200
Besi CNP 150 x 65 x 20 t.3,2 mm-45,06 kg Btg/6m 435,500 479,100 487,800 470,300 492,100 522,600
Besi CNP 200 x 75 x 20 t.2,3 mm-40,62 kg Btg/6m 395,500 427,100 435,100 443,000 458,800 537,900
Besi CNP 200 x 75 x 20 t.3,2 mm-55,62 kg Btg/6m 530,500 572,900 578,200 631,300 557,000 705,600
Besi CNP Kanal C 75 t.1.6 mm Btg/6m 95,000 101,700 98,800 113,100 112,100 127,300
Besi CNP Kanal C 75 t.1.8 mm Btg/6m 120,000 129,600 128,400 134,400 141,600 148,800
Besi CNP Kanal C 100 t.1.8 mm Btg/6m 140,000 149,800 145,600 149,800 155,400 169,400
Besi CNP Kanal C 100 t.2.0 mm Btg/6m 190,000 201,400 207,100 210,900 228,000 262,200
Besi CNP Kanal C 125 t.1.8 mm Btg/6m 160,000 174,400 172,800 169,600 184,000 220,800
Besi CNP Kanal C 125 t.2.0 mm Btg/6m 216,000 231,100 231,100 246,200 229,000 287,300
Besi CNP Kanal C 150 t.2.0 mm Btg/6m 243,000 267,300 257,600 267,300 284,300 303,800
43 H-BEAM - - - - -
Besi H beam 100 x 100 x 6 x 8 mm x 12 M-206/kg btg/12m 1,650,000 1,815,000 1,782,000 1,881,000 1,765,500 2,178,000
Besi H beam 125 x 125 x 5 x 7 mm x 12 M-222/kg btg/12m 1,800,000 1,962,000 1,998,000 1,980,000 2,160,000 2,304,000
Besi H beam 125 x 125 x 6,5 x 9 mm x 12 M-286/kg btg/12m 2,300,000 2,438,000 2,415,000 2,507,000 2,438,000 2,852,000
Besi H beam 150 x 150 x 7 x 10 mm x 12 M-378/kg btg/12m 3,100,000 3,379,000 3,472,000 3,689,000 3,534,000 4,309,000
Besi H beam 175 x 175 x 7 x 11 mm x 12 M-482/kg btg/12m 3,900,000 4,251,000 4,290,000 4,329,000 4,329,000 5,148,000
Besi H beam 200 x 200 x 8 x 12 mm x 12 M-599/kg btg/12m 4,800,000 5,088,000 5,376,000 5,520,000 5,712,000 6,048,000
Besi H beam 250 x 250 x 9 x 14 mm x 12 M-869/kg btg/12m 7,000,000 7,700,000 7,840,000 8,190,000 7,560,000 9,800,000
Besi H beam 300 x 300 x 10 x 15 mm x 12 M-1128/kg btg/12m 9,100,000 9,828,000 9,646,000 9,919,000 9,737,000 11,193,000
Besi H beam 350 x 350 x 12 x 19 mm x 12 M-1644/kg btg/12m 13,200,000 14,124,000 14,520,000 14,124,000 15,312,000 17,952,000
Besi H beam 400 x 400 x 13 x 21 mm x 12 M-2064/kg btg/12m 16,700,000 17,702,000 17,535,000 19,372,000 17,535,000 22,545,000
44 BESI SIKU (L) - - - - -
Siku 20 x 20 x 3 mm – 6 M-5,31kg btg/6m 410,000 451,000 426,400 442,800 463,300 524,800
Siku 25 x 25 x 3 mm – 6 M-6,72kg btg/6m 52,000 54,600 55,600 60,300 60,800 67,100
Siku 30 x 30 x 3 mm – 6 M-8,16kg btg/6m 66,000 72,600 70,000 71,900 75,200 86,500

377/396
Siku 40 x 40 x 3 mm – 6 M-11kg btg/6m 87,000 95,700 95,700 97,400 104,400 114,000
Siku 40 x 40 x 4 mm – 6 M-14,5kg btg/6m 1,200,000 1,308,000 1,284,000 1,404,000 1,380,000 1,584,000
Siku 40 x 40 x 5 mm – 6 M-18kg btg/6m 1,420,000 1,491,000 1,547,800 1,576,200 1,562,000 1,917,000
Siku 45 x 45 x 4 mm – 6 M-16,44kg btg/6m 137,000 143,900 148,000 163,000 163,000 169,900
Siku 45 x 45 x 5 mm – 6 M-20,5kg btg/6m 1,620,000 1,701,000 1,717,200 1,717,200 1,846,800 2,268,000
Siku 50 x 50 x 4 mm – 6 M-18,4kg btg/6m 1,450,000 1,537,000 1,508,000 1,580,500 1,624,000 1,783,500
Siku 50 x 50 x 5 mm – 6 M-22,68kg btg/6m 187,000 200,100 202,000 216,900 207,600 235,600
Siku 50 x 50 x 6 mm – 6 M-27,58kg btg/6m 222,000 237,500 235,300 259,700 257,500 297,500
Siku 60 x 60 x 5 mm – 6 M-27,42kg btg/6m 212,000 233,200 222,600 237,400 243,800 267,100
Siku 60 x 60 x 6 mm – 6 M-32,52kg btg/6m 267,000 288,400 283,000 293,700 280,400 341,800
Siku 65 x 65 x 6 mm – 6 M-35,46kg btg/6m 282,000 298,900 307,400 321,500 321,500 386,300
Siku 70 x 70 x 6 mm – 6 M-38,28kg btg/6m 3,011,000 3,251,900 3,372,300 3,191,700 3,432,500 3,793,900
Siku 70 x 70 x 7 mm – 6 M-44,28kg btg/6m 3,511,000 3,791,900 3,721,700 3,827,000 3,897,200 4,915,400
Siku 75 x 75 x 6 mm – 6 M-41,22kg btg/6m 322,000 338,100 357,400 360,600 373,500 441,100
Siku 75 x 75 x 7 mm – 6 M-47,64kg btg/6m 389,000 420,100 412,300 447,400 459,000 470,700
Siku 75 x 75 x 8 mm – 6 M-54,18kg btg/6m 441,000 485,100 463,100 480,700 493,900 613,000
Siku 75 x 75 x 9 mm – 6 M-60kg btg/6m 482,000 510,900 539,800 515,700 535,000 665,200
Siku 80 x 80 x 6 mm – 6 M-43,02kg btg/6m 3,421,000 3,728,900 3,831,500 4,036,800 3,968,400 4,584,100
Siku 80 x 80 x 8 mm – 6 M-57,96kg btg/6m 462,000 503,600 512,800 503,600 508,200 637,600
Siku 90 x 90 x 8 mm – 6 M-65,4kg btg/6m 522,000 569,000 542,900 579,400 616,000 699,500
Siku 90 x 90 x 9 mm – 6 M-73,2kg btg/6m 585,000 631,800 631,800 696,200 696,200 748,800
Siku 90 x 90 x 10 mm – 6 M-79,8kg btg/6m 636,000 680,500 706,000 680,500 706,000 871,300
Siku 100 x 100 x 8 mm – 6 M-73,2kg btg/6m 586,000 615,300 656,300 638,700 679,800 814,500
Siku 100 x 100 x 10 mm – 6 M-90,6kg btg/6m 7,220,000 7,869,800 8,086,400 8,158,600 8,086,400 9,530,400
Siku 100 x 100 x 11 mm – 6 M-119,4kg btg/6m 956,000 1,032,500 1,003,800 1,013,400 1,042,000 1,281,000
Siku 120 x 120 x 12 mm – 6 M-130kg btg/6m 1,042,000 1,146,200 1,104,500 1,114,900 1,167,000 1,302,500
Siku 125 x 125 x 12 mm – 6 M-140kg btg/6m 1,200,000 1,308,000 1,248,000 1,356,000 1,368,000 1,440,000
Siku 130 x 130 x 9 mm – 6 M-129kg btg/6m 1,301,000 1,431,100 1,379,100 1,444,100 1,561,200 1,821,400
Siku 130 x 130 x 12 mm – 6 M-140kg btg/6m 1,200,000 1,296,000 1,248,000 1,296,000 1,440,000 1,644,000
Siku 150 x 150 x 12 mm – 6 M-164kg btg/6m 1,340,000 1,474,000 1,487,400 1,594,600 1,407,000 1,835,800
Siku 150 x 150 x 15 mm – 6 M-202kg btg/6m 1,630,000 1,793,000 1,760,400 1,841,900 1,939,700 2,216,800
Siku 200 x 200 x 15 mm – 6 M-272kg btg/6m 2,200,000 2,332,000 2,464,000 2,530,000 2,420,000 3,058,000
Siku 200 x 200 x 16 mm – 6 M-301kg btg/6m 2,411,000 2,555,700 2,676,200 2,628,000 2,724,400 3,254,900
Siku 200 x 200 x 20 mm – 6 M-358kg btg/6m 2,900,000 3,190,000 3,190,000 3,393,000 3,045,000 3,857,000
Siku 200 x 200 x 25 mm – 6 M-442kg btg/6m 3,600,000 3,924,000 3,996,000 4,248,000 4,176,000 4,608,000
Siku 250 x 250 x 25 mm – 6 M-562kg btg/6m 4,500,000 4,815,000 4,860,000 5,355,000 5,310,000 5,895,000
45 LAMPU - - - - -
Lampu LED Philips Plafon Baret Cinnabarin 16 Watt Unit 325,000 357,500 351,000 347,800 364,000 390,000

378/396
Lampu LED Philips Plafon Baret Moire 10 Watt Unit 244,000 263,500 268,400 275,700 256,200 322,100
Lampu LED Philips Classic 7 Watt Unit 130,000 141,700 137,800 148,200 137,800 156,000
Lampu LED Philips Bulb (putih) 4 Watt Unit 170,000 183,600 178,500 198,900 193,800 215,900
Lampu LED Philips Bulb (putih) 5 Watt Unit 22,000 23,100 22,900 25,100 26,400 27,500
Lampu LED Panasonic Light Capsule Echo 14 Watt Unit 55,000 58,900 61,100 63,800 63,300 75,900
Lampu LED Megamen (putih) 3 Watt Unit 168,000 179,800 176,400 186,500 201,600 221,800
Lampu LED Memgamen (kuning) 11 Watt Unit 287,000 310,000 315,700 327,200 312,800 384,600
Lampu LED Osram A25 (putih) 5,4 Watt Unit 112,000 121,000 124,300 133,300 133,300 142,200
Lampu LED Osram A25 (kuning) 7,5 Watt Unit 135,000 147,200 143,100 148,500 162,000 171,500
Lampu LED Eagle Bulb ball E14 (putih) 3 Watt Unit 139,000 152,900 152,900 161,200 152,900 193,200
Lampu LED Eagle Bulb ball E27 (putih) 3 Watt Unit 160,000 171,200 168,000 177,600 188,800 209,600
Lampu LED Hinomaru 18 Watt 6 pcs Hemat Energi Unit 168,000 179,800 179,800 179,800 184,800 201,600

379/396
PANDUAN SINGKAT RAB

Silahkan Kunjungi Website untuk informasi panduan lengkap dan video tutorial
PORTAL TEKNIK

System Requirement
Syarat minimum Perangkat PC/Laptop Untuk versi PRO
1 Processor : Dual Core/Core i3 atau Higher (Core i5/i7 for better Performance)
2 RAM : 2 GB or Higher ( 8 GB is better)
3 OS : Mac dan Windows XP, Vista, 7,8,10 ( Win 10 is recommended)
4 Microsoft Office Support : MS Excel versi 2010 ( 2016 is very recommended)

*Perangkat dibawah spesifikasi minimum tetap dapat digunakan, namun processing data cukup memakan waktu
Perangkat dibawah spesifikasi minimum dapat menggunakan xPro versi BASIC

PANDUAN MENYUSUN RAB DENGAN xPRO v6.2020


Proses Utama
1 Lakukan Proses Aktivasi (Setujui Disclaimer dan Masukkan Kode Aktivasi)* Menu
*Enable macro excel jika diperlukan (lihat video panduan)
2 Lengkapi data (input data) project anda pada halaman Data DATA
3 Susun Uraian pekerjaan dan ID Pekerjaan, volume* dan pilih ID AHS yang relevan BQ
4 Tentukan kategori masing-masing pekerjaan (Group dan Type)
*Anda dapat menggunakan fitur CalcuxPro untuk menghitung volume pekerjaan CalcuxPro
4 Tentukan Waktu Mulai project (start), dan waktu untuk masing-masing sub-pekerjaan BQ
*Durasi pekerjaan secara default otomatis berdasarkan bobot dan rencana pekerja
5 Setelah pengisian BQ selesai pastikan sorot dan drag urutan "slot id" dengan benar
6 Lakukan perencanan jumlah tukang/pekerja (man power) Basic Price

Proses Pendukung
1 Update Harga Dasar Basic Price Basic Price
2 Sesuaikan Nilai Markup jika diperlukan Dashboard
3 Tambahkan Analisa Harga Satuan Pekerjaan (AHSP) jika belum tersedia dan akan digunakan AHSP

A MENU DAN DISCLAIMER


A1 Panduan Aktivasi
1 Buka Halaman Disclaimer, Baca/Pahami serta Setujui Discalimer (Pilih Setuju) Disclaimer
2 Masuk Ke Halaman Menu, Input Nama Pengguna dan Kode Aktivasi Menu
3 Jika Aktivasi Berhasil, Background merah akan menjadi Biru Gelap

A2 Panduan Disclaimer
1 Buka Disclaimer, Baca dan Pahami isi disclamer Disclaimer
2 Pilih Setuju atau Tidak Setuju pada pilihan disclaimer
3 Kembali ke Menu

A3 Panduan Kalkulator RAB (Fast Calculator)


1 Buka halaman Menu, dan lihat/cari fitur kalkulator RAB Menu
2 Masukan parameter (provinsi, jenis dan grade bangunan, mutu bahan dan struktur)
3 Input luasan efektif bangunan pada (Lt1…Lt4) yang mewakili luasan tiap lantai

B DASHBOARD REPORT
B1 Panduan Edit Markup
1 Buka Halaman Dashboard Report, cari fitur markup (pojok kiri atas) Dashboard
2 Input Nilai Markup yang diinginkan, default 0%
3 Nilai markup akan mengubah otomatis semua harga item sesuai persentase,
Info : Markup Nilai dapat digunakan untuk mengatur (naik/turun) harga item dengan cepat
dapat digunakan berbagai keperluan seperti setting profit, adjusting kenaikan inflasi dll

B2 Panduan Update Data


1 Buka Halaman Dashboard Report, cari fitur Update Data Dashboard

380/396
2 Update data untuk me-refresh semua data dalam software RAB Exarch
3 Setiap melakukan perubahan data atau parameter sebaikanya melakukan update data
Info : Tips 1 : Shortcut Update Data dengan keyboard ( Ctrl + Alt+ F5)
Tips 2 : Update data pada toolbar (Data ---> Refresh All)

B3 Panduan Aktifkan Full Mode dan Fast Mode


1 Buka Halaman Dashboard Report, cari fitur Drop Down Full Mode (dibawah update data) Dashboard
2 Pilih Full Mode untuk mengaktifkan semua fitur, namun kinerja procesor cukup besar
3 Pilih Fast Mode untuk menon-aktifkan semua fitur sementara, kinerja procesor akan lebih ringan
4 Setelah memilih mode yang sesuai , lakukan update data
Info : Tips 1 : Plilih mode Fast Mode ketika dalam peng-inputan/peng-editan
Tips 2 : Plilih mode Full Mode ketika ingin menampilkan semua laporan

B4 Panduan Mengelola Laporan Dashboard


1 Buka Halaman Dashboard Report, pastikan dalam Full mode dan Update Data Dashboard
2 Dashboard menampilkan resume data analisis yang sangat lengkap dan atraktif
3 Pilih kriteria sesuai filter navigasi dan dilengkapi scroll down/up untuk melihat data
4 Normalkan filter navigasi dengan klik ( tanda x) pada pojok navigasi
atau klik kanan pada slicer aktif, kemudian pilih "Clear Filter From..."

C BASIC PRICE
C1 Panduan Edit Harga Item
1 Buka Halaman Basic Price, cari kolom edit harga dasar Basic Price
2 Edit harga sesuai yang berlaku
3 Perubahan Harga akan otomatis mengubah nilai AHSP dan RAB (include nilai markup)
Info : Tips 1: Anda hanya perlu mengedit harga item "terpakai" pada project (lihat kolom status)

C2 Panduan Edit Tukang


1 Buka Halaman Basic Price, lihat kolom pojok kanan atas Basic Price
2 Pada Kolom "Orang " Silahkan masukkan jumlah pekerja yang direncanakan
3 Pada Kolom "Performance " Silahkan masukkan unjuk kerja tukang (kecepatan kerja tukang perhari)
4 Pada Kolom "Orang x Performance (OxP)" Otomatis, tidak perlu di edit
5 Edit tukang dapat mengatur Waktu Project, Upah project ( waktu x rate harian), jadwal, surplus
Info : Tips 1: Atur jumlah tukang dan performance untuk rencana surplus/keuntungan positif (hijau)
Tips 2: Surplus bernilai negatif (merah) berarti perkiraan rencana upah merugi

C3 Panduan Tambah Item Basic Price


1 Buka Halaman Basic Price, tempatkan item sesuai kategorinya (Pekerja,bahan,alat) Basic Price
2 Insert Row (Baris), lengkapi data item (nama, kode, satuan dan keterangan serta harga dasar)
3 Lengkapi "Formula/rumus" Kolom Harga satuan dan status, copy cell yg mengandung formula
Info : Tips : Tambah item umunya dilakukan untuk Item AHSP yangg belum terdaftar

D AHSP DETAIL
D1 Panduan Tambah AHSP
1 Buka Halaman AHSP, Cari kelompok AHSP Lainnya AHSP
2 Copy baris AHSP yang sudah ada, kemudian paste (klik kanan--> insert copied cells)
3 Edit Copyan AHSP, beri ID AHSP (pastikan tidak duplikat)
4 Gunakan item AHSP (bahan,upah,alat) yang sudah ada pada basic price, tambahkan jika tidak tersedia
Info : Tips 1: Copy AHSP yang se-type (SNI atau PU atau User)

E AHSP REKAP
E1 Panduan Tambah AHSP Rekap
1 Buka Halaman AHSP Rekap, Tentukan urutan ID AHSP yang akan ditambahkan AHSP REKAP
2 Insert Baris, ketik ID AHSP sesuai ID pada AHSP Detail
3 Kolom Isian Nama AHSP dan Biaya AHSP akan terisi Otomatis

F DATA PROJECT
F1 Panduan Input Data Project
1 Buka Halaman Data Project DATA
2 Lengkapi Isian dengan baik , terutama isian wajib

381/396
3 Beberapa isian terhubung data rab

G BQ PROJECT
G1 Panduan Input Pekerjaan Bill Of Quantity (BQ)
1 Buka Halaman BQ, cari kolom uraian pekerjaan BQ
2 Tambah baris jika diperlukan, Input nama uraian dan ID pekerjaan sesuai kelompoknya
3 Input Volume Pekerjaan secara manual atau (mungkin terhubung) dengan CalcuxPro CalcuxPro
4 Cari ID AHSP pada list Drop Down (diatas halaman BQ) atau cari di Rekap AHSP AHSP REKAP
5 Input ID AHS (cth : U-001) yang relevan dengan uraian pekerjaan (perhatikan kesesuaian satuan)
6 Cek kesesuaian Sub-Total Biaya Pekerjaan , pastikan benar
7 Pada Slot ID, pastikan ter-urut dengan benar, drag formula untuk menyusun
Info : 1: Input Uraian BQ pekerjaan merupakan bagian paling penting/kritis dalam Aplikasi
2: Uraian pekerjaan dan volume pekerjaan di estimasi sesuai desain/gambar kerja
3.Jumlah item pekerjaan dan volume akan mempengaruhi nilai RAB secara langsung

G2 Panduan Input Waktu Project


1 Buka Halaman BQ, cari kolom waktu project ( sebelah kanan) BQ
2 Input waktu mulai / start (manual) , untuk waktu selesai/Finish dan jumlah hari (otomatis)
3 Pada kolom waktu project, Input waktu mulai, silahkan link-kan antar cell
4 Pada isian durasi/lama, bersifat otomatis (berdasarkan perhitungan Jumlah Pekerja dan Bobot)
Info : 1. Pengaturan Waktu Project menjadi dasar penyusunan Penjadwalan Otomatis

G3 Panduan Input Kategori Pekerjaan


1 Buka Halaman BQ, cari kolom kategori ( sebelah kanan) BQ
2 Input Kategori Group dan Type Pekerjaan
3 Input Kategori akan membantu mengelompokan komsumsi biaya berdasarkan kategorinya
4 Edit atau tambahkan kategory jika diperlukan Kategori

H CALCUxPRO
H1 Panduan Input Parameter CalcuxPro
1 Buka Halaman CalcuxPro, cari calculator volume sesuai jenis pekerjaan CalcuxPro
2 Edit Ukuran/Dimensi sesuai parameter (warna biru), hasil perhitungan akan tampil
3 Hasil Perhitungan dapat di hubungkan (link) dengan volume pada BQ BQ
4 Secara default sudah di link-kan dengan BQ, mengubah dimensi akan mengubah nilai RAB

H2 Panduan Tambah CalcuxPro Pekerjaan


1 Buka Halaman CalcuxPro CalcuxPro
2 Pilih jenis kalkulator pekerjaan yang akan di duplikasi , sorot semua barisnya
3 Copy dan Paste, edit parameternya dan link-kan hasil perhitungannya ke BQ BQ
4 Anda dapat menggandakan kalkulator pekerjaan sesuai yang dibutuhkan pada BQ

I REKAP BQ
I1 Panduan Mengelola Rekap BQ
1 Buka Halaman Rekap BQ, Rekap BQ
2 Nilai RAB (sebelum PPN) harus sama (balance ) dengan Nilai RAB pada BQ BQ
3 Rekapitulasi Bill Of Quantity bekerja Otomatis
4 Print Out Jika diperlukan (export / save as pdf ---> print out)

J DETAIL REPORT
J1 Panduan Mengelola Laporan Detail (Rincian)
1 Buka Halaman Detail Report, Detail Report
2 Detail Report menampilkan detail pekerjaan (item komsumsi, waktu dan jumlah pekerja)
3 Pilih kategori pada Filter Navigasi untuk melihat data yang diinginkan
4 Print Out Jika diperlukan (export / save as pdf ---> print out)

J2 Panduan Mengelolah Matrix Pekerja (Matrix Upah Kerja)


1 Buka Halaman Detail Report, temukan fitur matrix upah kerja (pojok kanan) Detail Report
2 Update Data (Klik pada Dashboard) atau Tekan Ctrl + Alt +F5
3 Pilih kategori UPAH pada Filter Navigasi untuk melihat data PEKERJA
4 Tekan Scrool untuk menggeser periode, lihat data matrix biaya (dalam juta) per periode

382/396
5 Pada Bar, menampilkan perbandingan biaya upah dengan load (OH) vs Rate harian x hari
6 Jika berwarna merah (minus, perkiraan merugi), jika biru (positif, surplus)
7 Adjust keseimbangan margin upah , edit jumlah pekerja dan performance pada Basic Price Basic Price
8 Print Out Jika diperlukan (export / save as pdf ---> print out)

K AHS REPORT (AHSP TERPAKAI)


K1 Panduan Mengelola Laporan Detail (Rincian)
1 Buka Halaman AHS Report AHS Report
2 Update Data (Klik pada Dashboard) atau Tekan Ctrl + Alt +F5
3 Menampilkan AHS Terpakai dalam project, print out jika diperlukan
4 Print Out Jika diperlukan (export / save as pdf ---> print out)

L HS REPORT (LAPORAN HARGA SATUAN)


L1 Panduan Mengelola Laporan HS
1 Buka Halaman HS Report HS Report
2 Update Data (Klik pada Dashboard) atau Tekan Ctrl + Alt+F5
3 Menampilkan HS Terpakai dalam project
4 Print Out Jika diperlukan (export / save as pdf ---> print out)

M MATRIX ITEM
M1 Panduan Mengelola Matrix Item
1 Buka Halaman Matrix Item Matrix Item
2 Update Data (Klik pada Dashboard) atau Tekan Ctrl + Alt +F5
3 Pilih Elemen yang akan di tampilkan, default semua item ditampilkan
4 Scrool untuk melihat distribusi biaya item terhadap periode (waktu)
5 Beban biaya harian ditampilkan dalam satuan juta
6 Print Out Jika diperlukan (export / save as pdf ---> print out)
Info : Matrix item menampilkan rencana pengadaan item (bahan,upah,alat) pada waktu tertentu
Matrix item dapat menampilkan bobot biaya harian
Matrix item dapat menampilkan outcome biaya harian

N GANTT CHART
N1 Panduan Mengelola Gantt Chart
1 Buka Halaman Gantt Chart Gantt Chart
2 Update Data (Klik pada Dashboard) atau Tekan Ctrl + Alt+F5
3 Filter Navigasi untuk memilih data yang akan ditampilkan
4 Scrool untuk melihat distribusi biaya satuan pekerjaan terhadap periode (waktu)
5 Beban harian ditampilkan dalam satuan bobot %,
5 Bobot Biaya harian ditampilkan dalam satuan Juta pada Line Chart
6 Print Out Jika diperlukan (export / save as pdf ---> print out)
Info : Gantt Chart menampilkan beban rencana pekerjaan pada waktu tertentu
Gantt Chart dapat menampilkan bobot biaya harian
Gantt Chart dapat menampilkan outcome biaya harian
Tips : Line Chart Matrix item dan Gantt Chart adalah identik

O KURVA S
O1 Panduan Mengelola Kurva S
1 Buka Halaman Kurva S Kurva S
2 Update Data (Klik pada Dashboard) atau Tekan Ctrl + Alt +F5
3 Filter Navigasi untuk memilih data yang akan ditampilkan
4 Scrool untuk melihat distribusi biaya pekerjaan terhadap periode (waktu dalam minggu)
5 Beban Mingguan ditampilkan dalam satuan bobot %,
6 Print Out Jika diperlukan (export / save as pdf ---> print out)
Info : Kurva menampilkan beban rencana pekerjaan pada waktu tertentu
Kurva S dapat menampilkan bobot mingguan
Kurva S dapat menampilkan rencana laju pekerjaan (progress)

P CALENDAR
P1 Panduan Mengelola Calendar Project
1 Buka Halaman Calendar Calendar

383/396
2 Update Data (Klik pada Dashboard) atau Tekan Ctrl + Alt +F5
3 Filter Navigasi untuk memilih divisi pekerjaan yang akan ditampilkan
4 Scrool untuk melihat hari kalender
5 Print Out Jika diperlukan (export / save as pdf ---> print out)

Q USEFULL
Q1 Panduan Menggunakan Conversi Besi Beton
1 Buka Halaman Usefull Usefull
2 Cari Fitur Konversi Besi Beton
3 Input Parameter, jenis beton, berat, dimensi balok hingga faktor
4 Lihat hasil konversi dari kg beton ---> m1 (atau batang) besi
5 Lakukan untuk konversi berat besi beton lainnya

R PROBLEM SOLVE
R1 Mengatasi Pivot Tabel ERROR
1 Posisikan cursor pada salah satu sell pivot table
2 Pada Menu Bar (Pilih "Analize")
3 Pada Analize (Pilih "Change Data Source")
4 Select a table or range , Pada isian Tabel/range ketik : AEB
5 Lakukan Update Data ( Ctrl+Alt+F5) dan selesai
* Problem ini umumnya terjadi ketika anda mengganti nama file software (default " Software RAB xPro v6.0)
* Solusi Mengganti Nama File,simpan file aplikasi dalam folder dan edit nama folder sesuai identitas project

R2 Enable Macro Excel 2010 -2016


1 File ---> Option
2 (Terbuka Jendela "Excel Options) ----> Pilih "Trust Center" ---> Klik " Trust Center Settings"
3 (Terbuka Jendela "Trust Center") ----> Pilih "Macro Setting"
4 Aktifkan/Enable "All macro setting and Code (not recommended …..") Pilihan paling no 4
5 Restart Aplikasi atau PC/Laptop Jika diperlukan

384/396
TABEL 1
KALKULATOR KONVERSI BESI BETON (Kg---> m1) BERAT
Type Sloof Sloof 30x40 - 8xØ12+2xØ10 ,Ø8-15cm NO
M,kg 618.3 P(48m1)-Ø12(34btg)-Ø10(8btg)-Ø8(48btg) 1
P,m1 0.3 Berat Spesifik Besi Ø12, % / m1 56% 2
L,m1 0.4 Berat Spesifik Besi Ø10, % / m1 10% 3
ØD1,mm 12.0 Berat Spesifik Besi Ø8, % / m1 36% 4
n1,bh 8 Berat Spesifik,kg/m1 12.8 5
ØD2,bh 10.0 Panjang Total Beton,m1 48.5 6
n2,bh 2 Kebutuhan besi Ø12,m1 388.0 7
Ød3,mm 8.0 Kebutuhan besi Ø10,m1 97.0 8
r,m1 0.15 Kebutuhan besi Ø8,m1 557.1 9
Factor,% 0% Luas Bekisting, m2 38.8 10
11
Note : Aplikasi untuk menghitung konversi berat besi beton ke dalam satuan 12
meter (atau batang besi 12 m)
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
BERAT JENIS BAHAN KONSTRUKSI
Material Berat jenis Satuan
Air 1000 Kg/m3
Alumunium 2712 kg/m3
Aspal Hotmix (Laston) 2,3 ton/m3
Baja 7850 kg/m3
Batu alam 2600 kg/m3
Batu Bata 3 kg/biji
Batu belah, batu bulat, batu gunung 1500 kg/m3
Batu hancur 1602 kg/m3
Batu karang 700 kg/m3
Batu pecah 1450 kg/m3
Besi cor 6800 – 7800 kg/m3
Besi tempa 7750 kg/m3
Besi tuang 7250 kg/m3
Beton 2200 kg/m3
Beton bertulang 2400 kg/m3
Cat 1.4 kg/Liter
Cat 1400 kg/m3
emas 19320 kg/m3
Granit padat 2691 kg/m3
Granit rusak 1650 kg/m3
Gypsum padat 2787 kg/m3
Kardus 689 kg/m3
Kawat Beton (Bendrat) 6680 kg/m3
Kayu (kelas I) 1000 kg/m3
Kerikil, koral,split (kering/lembab) 1800 kg/m3
Kertas standar 1201 kg/m3
lapis Perekat (Tack Coat) 0,15-0,50 liter/m2
Lapis Resap Pengikat (Prime Coat) 0,4-1,3 liter/m2
Marmer padat 2563 kg/m3
Marmer rusak 1570 kg/m3
Pasangan bata merah 1700 kg/m3
Pasangan batu belah, bulat, gunung 2200 kg/m3
Pasangan batu cetak 2200 kg/m3
Pasangan batu karang 1450 kg/m3
pasir 1400 Kg/m3
Perak 10490 kg/m3
Semen 3150 kg/m3
Seng 7135 kg/m3
Serbuk gergaji 210 kg/m3
Stainless steel 7480-8000 kg/m3
Tanah, lempung (basah) 2000 kg/m3
Tanah, lempung (kering/lembab) 1700 kg/m3
Tembaga 8930 kg/m3
Timah hitam/ timbel 11400 kg/m3
TABEL 2
TABEL MUTU BETON
Mutu Semen (kg) Pasir (kg) Kerikil (kg)
K-100 7,4 Mpa Mix (1 : 4 : 4) 87% 247 869 999
K-125 9,8 Mpa Mix (1 : 3 : 4) 78% 276 828 1012
K-150 12,2 Mpa Mix (1 : 3 : 3) 72% 299 799 1017
K-175 14,5 Mpa Mix (1 : 2 : 3) 66% 326 760 1029
K-200 16,9 Mpa Mix (1 : 2 : 3) 61% 352 731 1031
K-225 19,3 Mpa Mix (1 : 2 : 3) 58% 371 698 1047
K-250 21,7 Mpa Mix (1 : 2 : 3) 56% 384 692 1039
K-275 24,0 Mpa Mix (1 : 2 : 2) 53% 406 684 1026
K-300 26,4 Mpa Mix (1 : 2 : 2) 52% 413 681 1021
K-325 28,8 Mpa Mix (1 : 2 : 2) 49% 439 670 1006
K-350 31,2 Mpa Mix (1 : 1 : 2) 48% 448 667 1000
SNI DT - 91 - 0008 - 2007 Tata Cara Perhitungan Harga Satuan Pekerjaan Beton Oleh Dept. Pekerjaan Umum

TABEL BERAT BESI BETON Update 2020


Ukuran Besi Berat /btg Berat /m1 Harga /btg Harga/kg
Ø6 x 12 meter 2.66 0.22 23,000 8,647
Ø8 x 12 meter 4.74 0.40 45,000 9,494
Ø10 x 12 meter 7.40 0.62 70,000 9,459
Ø12 x 12 meter 10.66 0.89 102,000 9,568
Ø16 x 12 meter 18.96 1.58 180,000 9,494
Ø19 x 12 meter 26.76 2.23 254,000 9,492
Ø22 x 12 meter 35.76 2.98 339,000 9,480
Ø25 x 12 meter 46.20 3.85 440,000 9,524
Harga Besi/kg 9,395
Air (liter) w/c ratio
215 0,87 Air 1000 Kg/m3
215 0,78 Alumunium 2712 kg/m3
215 0,72 Aspal Hotmix (Laston)2,3 ton/m3
215 0,66 Baja 7850 kg/m3
215 0,61 Batu alam 2600 kg/m3
215 0,58 Batu Bata 3 kg/biji
215 0,56 Batu belah, batu bulat 1500 kg/m3
215 0,53 Batu hancur 1602 kg/m3
215 0,52 Batu karang 700 kg/m3
215 0,49 Batu pecah 1450 kg/m3
215 0,48 Besi cor 6800 – 7 kg/m3
Besi tempa 7750 kg/m3
Besi tuang 7250 kg/m3
Beton 2200 kg/m3
Beton bertulang 2400 kg/m3
Cat 1.4 kg/Liter
Cat 1400 kg/m3
emas 19320 kg/m3
Granit padat 2691 kg/m3
Granit rusak 1650 kg/m3
Gypsum padat 2787 kg/m3
Kardus 689 kg/m3
Kawat Beton (Bendrat6680 kg/m3
Kayu (kelas I) 1000 kg/m3
Kerikil, koral,split (k 1800 kg/m3
Kertas standar 1201 kg/m3
lapis Perekat (Tack Co0,15-0,50liter/m2
Lapis Resap Pengikat 0,4-1,3 liter/m2
Marmer padat 2563 kg/m3
Marmer rusak 1570 kg/m3
Pasangan bata merah 1700 kg/m3
Pasangan batu belah, b2200 kg/m3
Pasangan batu cetak 2200 kg/m3
Pasangan batu karang 1450 kg/m3
pasir 1400 Kg/m3
Perak 10490 kg/m3
Semen 3150 kg/m3
Seng 7135 kg/m3
Serbuk gergaji 210 kg/m3
Stainless steel 7480-800kg/m3
Tanah, lempung (basah2000 kg/m3
Tanah, lempung (kerin1700 kg/m3
Tembaga 8930 kg/m3
Timah hitam/ timbel 11400 kg/m3
Kategori 1 : User Kategory
No ID
1 PPS
2 LT1
3 LT2
4 LT3
5 FN1
6 FN2
7 DLL

Kategori 2 :
No ID
1 STR
2 ARS
3 MEK
4 ELE
5 OTH

Kategori 3 :
No ID
1 A
2 B
3 C
4 D
5 E
6 F
7 G
8 H
9 I
10 J
11 K
12 L
13 M
14 N
15 O
16 P
17 Q
18 R

Mode Operasi
No ID
1 A
2 B

Disclaimer
No ID
1 A
2 B

Link Automatic Print Preview


1
2
3
4
5
: User Kategory
Grade Pekerjaan
Pekerjaan Persiapan Pendahulan
Pekerjaan Lantai 1
Pekerjaan Lantai 2
Pekerjaan Lantai 3
Pekerjaan Finishing 1
Pekerjaan Finishing 2
Pekerjaan Lainnya

Jenis Pekerjaan
Pekerjaan Struktural
Pekerjaan Arsitektural
Pekerjaan Mekanikal
Pekerjaan Elektrikal
Pekerjaan lainnya

Nama Pekerjaan
PEKERJAAN PERSIAPAN & PENDAHULUAN
PEKERJAAN PONDASI
PEKERJAAN SLOOF
PEKERJAAN TIMBUNAN, PENINGGIAN DAN PEMADATAN
PEKERJAAN KOLOM
PEKERJAAN RINGBALOK (BALOK)
PEKERJAAN COR PLATE BETON (DAK BETON)
PEKERJAAN DINDING
PEKERJAAN ATAP
PEKERJAAN KUSEN, PINTU, JENDELA DAN ACCESORIS
PEKERJAAN INST. PIPA AIR BERSIH, LIMBAH DAN SANITASI
PEKERJAAN INST. LISTRIK DAN PENERANGAN
PEKERJAAN KERAMIK LANTAI DAN DINDING
PEKERJAAN LANGIT-LANGIT (PLAFON)
PEKERJAAN PENGECATAN DAN WATERPROFING
PEKERJAAN TANGGA
PEKERJAAN PAGAR DAN TAMAN/HALAMAN
PEKERJAAN TAMBAHAN DAN LAINNYA

Mode Operasi
Fast Mode
Full Mode

Disclaimer
Tidak Setuju
SETUJU

matic Print Preview


OFFSET('Detail Report'!$B$2,0,0,COUNTA('Detail Report'!$B:$B)+2,23) Detail Report
OFFSET('Matrix Item'!$B$2,0,0,COUNTA('Matrix Item'!$B:$B)+4,18) Matrix Item
OFFSET('Gantt Chart'!$B$2,0,0,COUNTA('Gantt Chart'!$B:$B)+4,22) Gantt Chart
OFFSET('AHS Report'!$B$2,0,0,COUNTA('AHS Report'!$B:$B)+COUNTA('AHS AHS Report
OFFSET('HS Report'!$B$2,0,0,COUNTA('HS Report'!$C:$C)+7,7) HS Report
(klik gambar diatas untuk visit)
Untuk Informasi konsultasi, diskusi dan Order Software RAB silahkan kontak admin diatas
Terkendala dalam penyusunan RAB silahkan kontak kami untuk layanan jasa hitung RAB Professional dari mitra arsitek
---> Jasa Hitung RAB Bangunan (rumah, ruko, kantor dll) dan Gedung
---> Jasa Penyusunan RAB Lelang LPSE
---> Atau kerja sama lainnya
Layanan dan kualitas terbaik dengan harga teman…
atau
Temukan berbagai file teknik dan paket referensi teknik, please
http://download.mitra-arsitek.com
Inovator Teknik Channel (please visit and subscribe us)

Anda mungkin juga menyukai