ρ - ρ’ = (0,85.fc’.β1.d’.600)/(fy.dR(600-fy))
ρ - ρ’ = (0,85.20.0,85.60.600)/(300.700(600-300))
ρ - ρ’ = 0,00826
a = (ρ - ρ’)m.dR = 0,00826.17,65.700 = 102,05 mm
Mn1 = (ρ - ρ’)b.dR.fy(dR-a/2) = 0,00826.400.700.300(700-102,05/2) = 450,285 kNm
Mn2 = Mn-Mn1 = 1177,7-450,285 = 727,415 kNm
ρ’ = Mn2/(b.dR.fy(dR-d’)) = 727,415.106/(400.700.300(700-60)) = 0,0135
ρ = (ρ - ρ’)+ρ’ = 0,00826+0,0135 = 0,02176
Tulangan bawah = As1 = ρ.b.dR = 0,02176.400.700 = 6096,8 mm2
Tulangan bawah pakai 9∅32 dengan As1 = 7238,3 mm2
Tulangan atas = As2 = ρ’.b.dR = 0,0135.400.700 = 3780 mm2
Tulangan bawah pakai 6∅32 dengan As2 = 4825,5 mm2
6∅32
9∅32
ASUMSI KONDISI I
Jarak antar tulangan untuk tulangan atas
JATatas = (400-2(12)-2(40)-4(32))/3 = 56 mm > 25 mm (OK)
Jarak antar tulangan untuk tulangan bawah
JATbawah = (400-2(12)-2(40)-5(32))/4 = 34 mm > 25 mm (OK)
daktual = da = 800-40-12-32-(25/2) = 703,5 mm > dR (OK)
d’aktual = d’a = 40+12+32+(25/2) = 96,5 mm
C=T
a = (As1-As2).fy/(0,85.fc’.b) = (7238,3-4825,5).300/(0,85.20.400) = 106,45 mm
c = a/β1 = 106,45 /0,85 = 125,24 mm
εs = (da-c).0,003/c = (703,5-125,24).0,003/125,24 = 0,01385
Fs = εs.E = 0,01385.2x105 = 2770 MPa > fy (tulangan daerah tarik leleh)
ε’s = (c-d’a).0,003/c =(125,24-96,5).0,003/125,24 = 0,000688
Fs’ = ε’s.E = 0,000688.2x105 = 137,6 MPa < fy (tulangan daerah tekan belum leleh)
Karena tulangan daerah tarik leleh dan daerah tekan belum leleh, maka asumsi kondisi I
tidak diterima dan masuk ke kondisi II.
c1,2 = (-b±(b2-4ac)0.5)/2a
= (-723810±((723810)2-4. 5780.(- 279396450))0.5)/(2.5780)
= (-723810±2642640,13)/11560
c1 = 165,99 (OK)
c2 = -291,22 (TM)
εs = (da-c1).0,003/c1 = (703,5-165,99)0,003/165,99 = 0,00971
Fs = εs.E = 0,00971.2x105 = 1942 MPa > Fy (tulangan daerah tarik leleh)
εs’ = (c1-d’a).0,003/c1 = (165,99-96,5)0,003/165,99 = 0,00126