DAFTAR HARGA SATUAN UPAH DAN BAHAN

BAHAN DAN UPAH 2017

HARGA SATUAN
NO KOMPONEN SATUAN
( Rp )
1 2 3 4

I UPAH
1 Mandor HOK 90,000.00
2 Kepala Tukang HOK 80,000.00
3 Tukang HOK 75,000.00
4 Pembantu Tukang HOK 60,000.00

II BAHAN / MATERIAL
1 Atras (tanah urug) M3 82,500.00
2 Bata merah BH 632.50
3 Batu belah 10/15 cm M3 220,000.00
4 Besi beton Kg 10,780.00
5 Cat dasar / menie sejenis F-TALIT Kg 50,600.00
6 Cat penutup tembok sejenis Vinilex Kg 38,000.00
7 Granit 60x60 bh 50,500.00
8 Genteng nok metal m 16,500.00
9 Genteng Metal Lbr 99,000.00
10 GRC tebal 4 mm Lbr 77,000.00
11 Lisplank GRC m 20,000.00
12 Kawat beton Kg 20,900.00
13 List keliling gypsum lebar 8 cm M' 5,500.00
14 Paku biasa 1/2" - 1" Kg 18,700.00
15 Paku biasa 2" - 5" Kg 18,700.00
16 Pasir beton M3 231,000.00
17 Pasir pasang M3 165,000.00
18 Pasir urug M3 88,000.00
19 Pelumas bekisting Ltr 16,500.00
20 Plamir kayu / kualitas 1 Kg 27,500.00
21 Plamir tembok Kg 22,000.00
22 Portland cemen (PC) Kg 1,300.00
23 Split ( batu pecah mesin ) 2/3 M3 343,750.00
24 Triplek 3 mm Lbr 62,700.00
25 Triplek 9 mm Lbr 121,000.00
26 Pintu Alumunium ( 160 X 250 ) UNIT 700,000.00
27 Jendela Alumunium ( 220 X 140 ) UNIT 0.00
28 Besi Holo 2 cm M' 4,345.00
29 Besi Holo 4 cm M' 6,187.50
30 Baja Ringan 0.75 SNI M2 125,000.00
31 Buis Beton setengah dia 30 cm M 20,000.00
32 Kaca 5mm M2 114,000.00
33 Kusen Pintu Alumunium M' 180,000.00
34 Rangka Pintu Alumunium M' 90,000.00
35 Lockcase BH 95,000.00
36 Double Cylinder BH 80,000.00
37 Full Handle BH 490,000.00
38 Engsel Pintu BH 50,000.00

Cirebon, …. Juni 2017


Ketua Tim Perencana & Pengawas Kepala SMKN 1 Lemahabang

ESAK KHAIDIR, ST H. WIRYO SANTOSO, M. M.Pd


NIP. 19591218 1984 03 1 008
ANALISA SATUAN PEKERJAAN

KOEFESIEN HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL


KODE ANALISA URAIAN
INDEX ( Rp ) ( Rp ) ( Rp )

1 2 3 4 5 6

ABK. 200.01 1 M3 GALIAN TANAH BIASA


0.4 HOK Pembantu tukang 60,000.00 24,000.00
0.04 HOK Mandor 90,000.00 3,600.00 27,600.00
27,600.00
ABK. 200.12 1 M3 URUGAN TANAH
1.2 M3 Tanah Urug 82,500.00 99,000.00 99,000.00

0.3 HOK Pembantu tukang 60,000.00 18,000.00


0.01 HOK Mandor 90,000.00 900.00 18,900.00
117,900.00
ABK.300.08 1 M3 MEMBUAT BETON TUMBUK AD. 1:3:6 TEBAL 5 CM
197 Kg Semen portland 1,300.00 256,100.00
0.47 M3 Pasir beton 231,000.00 108,570.00
0.94 M3 Kerikil 343,750.00 323,125.00 687,795.00

1.65 HOK Pembantu tukang 60,000.00 99,000.00


0.25 HOK Tukang batu 75,000.00 18,750.00
0.025 HOK Kepala tukang 80,000.00 2,000.00
0.08 HOK Mandor 90,000.00 7,200.00 126,950.00
814,745.00
ABK. 300.19 1 M3 BETON BERTULANG AD. 1:2:3
232 Kg Semen portland 1,300.00 301,600.00
0.52 M3 Pasir beton 231,000.00 120,120.00
0.78 M3 Spleet 2/3 cm 343,750.00 268,125.00 689,845.00

1.65 HOK Pembantu tukang 60,000.00 99,000.00


0.25 HOK Tukang batu 75,000.00 18,750.00
0.025 HOK Kepala tukang 80,000.00 2,000.00
0.08 HOK Mandor 90,000.00 7,200.00 126,950.00
816,795.00
ABK. 300.32 1 KG PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR
1.05 Kg Besi beton 10,780.00 11,319.00
0.015 Kg Kawat beton 20,900.00 313.50 11,632.50

0.007 HOK Pembantu tukang 60,000.00 420.00


0.007 HOK Tukang besi 75,000.00 525.00
0.0007 HOK Kepala tukang 80,000.00 56.00
0.0003 HOK Mandor 90,000.00 27.00 1,028.00
12,660.50
ABK. 300.35 1 M2 PASANG BEKISTING UNTUK PONDASI
0.04 M3 Kayu hutan/papan/kaso 1,800,000.00 72,000.00
0.3 Kg Paku biasa 2" - 5" 18,700.00 5,610.00
0.1 Ltr Pelumas bekisting 16,500.00 1,650.00 79,260.00

0.3 HOK Pembantu tukang 60,000.00 18,000.00


0.26 HOK Tukang kayu 75,000.00 19,500.00
0.026 HOK Kepala tukang 80,000.00 2,080.00
0.005 HOK Mandor 90,000.00 450.00 40,030.00
119,290.00
ABK. 300.37 1 M2 PASANG BEKISTING UNTUK KOLOM STRUKTUR
0.04 M3 Kayu hutan/papan/kaso 1,850,000.00 74,000.00
0.015 M3 Balok kayu hutan 1,850,000.00 27,750.00
0.4 Kg Paku biasa 2" - 5" 18,700.00 7,480.00
0.2 Ltr Pelumas bekisting 16,500.00 3,300.00
0.35 Lbr Triplex tebal 9 mm 121,000.00 42,350.00
2 Btg Dolken kayu Ø 8-10/4' 30,000.00 60,000.00 214,880.00

0.3 HOK Pembantu tukang 60,000.00 18,000.00


0.33 HOK Tukang kayu 75,000.00 24,750.00
0.033 HOK Kepala tukang 80,000.00 2,640.00
0.006 HOK Mandor 90,000.00 540.00 45,930.00
260,810.00
KOEFESIEN HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL
KODE ANALISA URAIAN
INDEX ( Rp ) ( Rp ) ( Rp )

1 2 3 4 5 6

ABK. 300.38 1 M2 PASANG BEKISTING UNTUK BALOK


0.04 M3 Kayu hutan/papan/kaso 1,850,000.00 74,000.00
0.018 M3 Balok kayu hutan 1,850,000.00 33,300.00
0.4 Kg Paku biasa 2" - 5" 18,700.00 7,480.00
0.2 Ltr Pelumas bekisting 16,500.00 3,300.00
0.35 Lbr Triplex tebal 9 mm 121,000.00 42,350.00
2 Btg Dolken kayu Ø 8-10/4' 30,000.00 60,000.00 220,430.00

0.32 HOK Pembantu tukang 60,000.00 19,200.00


0.33 HOK Tukang kayu 75,000.00 24,750.00
0.033 HOK Kepala tukang 80,000.00 2,640.00
0.006 HOK Mandor 90,000.00 540.00 47,130.00
267,560.00
ABK.300.39 1 M2 PASANG BEKISTING UNTUK LANTAI
0.04 M3 Kayu hutan/papan/kaso 1,850,000.00 74,000.00
0.015 Kg Balok kayu hutan 1,850,000.00 27,750.00
0.2 Ltr Pelumas bekisting 18,700.00 3,740.00
0.4 Kg Paku biasa 2" - 5" 18,700.00 7,480.00
0.35 Lbr Triplex tebal 9 mm 121,000.00 42,350.00
6 Btg Dolken kayu Ø 8-10/4' 30,000.00 180,000.00 335,320.00

0.32 HOK Pembantu tukang 60,000.00 19,200.00


0.33 HOK Tukang kayu 75,000.00 24,750.00
0.033 HOK Kepala tukang 80,000.00 2,640.00
0.006 HOK Mandor 90,000.00 540.00 47,130.00
382,450.00
ABK.300.42 1 M2 MEMBUAT BETON DENGAN MUTU K 225
388 Kg semen portland 1,300.00 504,400.00
0.65 M3 Pasir beton 231,000.00 150,150.00
0.65 M3 Kerikil 343,750.00 223,437.50 877,987.50

6 HOK Pembantu tukang 60,000.00 360,000.00


1 HOK Tukang batu 75,000.00 75,000.00
0.1 HOK Kepala tukang 80,000.00 8,000.00
0.3 HOK Mandor 90,000.00 27,000.00 470,000.00
1,347,987.50
ABK.350.10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA AD. 1:2
70 Bh Bata merah 5 x 11 x 22 cm 632.50 44,275.00
18.95 Kg Semen portland 1,300.00 24,635.00
0.038 M3 Pasir pasang 165,000.00 6,270.00 75,180.00

0.32 HOK Pembantu tukang 60,000.00 19,200.00


0.1 HOK Tukang batu 75,000.00 7,500.00
0.01 HOK Kepala tukang 80,000.00 800.00
0.015 HOK Mandor 90,000.00 1,350.00 28,850.00
104,030.00
ABK.350.11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA AD. 1:3
70 Bh Bata merah 5x11x22 cm 632.50 44,275.00
14.37 Kg Semen portland 1,300.00 18,681.00
0.04 M3 Pasir pasang 165,000.00 6,600.00 69,556.00

0.32 HOK Pembantu tukang 60,000.00 19,200.00


0.1 HOK Tukang batu 75,000.00 7,500.00
0.01 HOK Kepala tukang 80,000.00 800.00
0.015 HOK Mandor 90,000.00 1,350.00 28,850.00
98,406.00
ABK.360.04 1 M2 PLESTERAN AD. 1:4 TEBAL 15 MM
5.2 Kg Semen Portland 1,300.00 6,760.00
0.02 M3 Pasir Pasang 165,000.00 3,300.00 10,060.00

0.2 HOK Pembantu tukang 60,000.00 12,000.00


0.15 HOK Tukang batu 75,000.00 11,250.00
0.015 HOK Kepala tukang 80,000.00 1,200.00
0.01 HOK Mandor 90,000.00 900.00 25,350.00
35,410.00
KOEFESIEN HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL
KODE ANALISA URAIAN
INDEX ( Rp ) ( Rp ) ( Rp )

1 2 3 4 5 6

SNI 6.24.2 1 M2 PLESTERAN AD. 1:5 TEBAL 30 MM


12.96 Kg Semen Portland 1,300.00 16,848.00
0.038 M3 Pasir Pasang 165,000.00 6,270.00 23,118.00

0.32 HOK Pembantu tukang 60,000.00 19,200.00


0.25 HOK Tukang batu 75,000.00 18,750.00
0.025 HOK Kepala tukang 80,000.00 2,000.00
0.015 HOK Mandor 90,000.00 1,350.00 41,300.00
64,418.00
ABK.452.36 1 M' PASANG LIST KELILING (TS.5) GYPSUM
1 M' List keliling gypsum 5,500.00 5,500.00
0.05 Kg Paku biasa 1/2' -1' 18,700.00 935.00 6,435.00

0.1 HOK Pembantu tukang 60,000.00 6,000.00


0.2 HOK Tukang kayu 75,000.00 15,000.00
0.02 HOK Kepala tukang 80,000.00 1,600.00
0.005 HOK Mandor 90,000.00 450.00 23,050.00
29,485.00
1 M2 PASANG LANTAI KERAMIK 40 X 40 CM
7 Bh Keramik 60 x 60 cm 11,000.00 77,000.00
9.3 Kg Semen portland 1,300.00 12,090.00
0.018 M3 Pasir pasang 165,000.00 2,970.00
1.5 Kg Semen warna 2,000.00 3,000.00 95,060.00

0.27 HOK Pembantu tukang 60,000.00 16,200.00


0.13 HOK Tukang kayu 75,000.00 9,750.00
0.013 HOK Kepala tukang 80,000.00 1,040.00
0.014 HOK Mandor 90,000.00 1,260.00 28,250.00
123,310.00
ABK. 950,15 1 M2 PENGECATAN TEMBOK BARU ( 1 LPS PLAMIR +1 LPS CAT DASAR + 2 LPS CAT PENUTUP )
MUTU CAT SEJENIS VINILEX
0.1 Kg Plamir tembok 22,000.00 2,200.00
0.26 Kg Cat penutup 2 x ( tembok ) 38,000.00 9,880.00
0.1 Kg Cat dasar / menie 0.00 12,080.00

0.02 HOK Pembantu tukang 60,000.00 1,200.00


0.063 HOK ` 75,000.00 4,725.00
0.0063 HOK Kepala tukang 80,000.00 504.00
0.0025 HOK Mandor 90,000.00 225.00 6,654.00
18,734.00
ABK. PLAFOND 1M2 PASANG PLAFOND RANGKA HOLO DAN DENGAN PENUTUP
GRC BERIKUT PENGECATAN
1.00 M' GRC 4 mm 26,736.11 26,736.11
1.00 M' Holo 4/4 meni 6,187.50 6,187.50
2.92 M' Holo 2/4 meni 4,345.00 12,687.40
10.00 Kawat Bwg 12 0.00
0.01 Kg Paku screw 2.5 cm 18,700.00 187.00
42.50 Adhesive 0.00
0.50 Kain kasa 0.00
0.38 Kg Cat penutup 2 kali 38,000.00 14,250.00
0.25 Kg Paku beton 0.00 60,048.01

0.13 HOK Mandor 90,000.00 11,736.00


0.37 HOK Kepala tukang 80,000.00 29,336.00
0.06 HOK Tukang 75,000.00 4,845.00
0.12 HOK Pekerja 60,000.00 7,200.00 53,117.00
113,165.01
KOEFESIEN HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL
KODE ANALISA URAIAN
INDEX ( Rp ) ( Rp ) ( Rp )

1 2 3 4 5 6

1 TITIK PENGADAAN DAN PEMASANGAN LAMPU DOWNLIGHT LENGKAP

1 bh Lampu Downlight Lengkap 105,000.00 105,000.00


5 m' Kabel NYM 2 x 1,5 sqmm 6,440.00 32,200.00
1 bh Kotak Sambung / T- Dus 3,500.00 3,500.00 140,700.00
1 ls Material Bantu 30 % 28,140.00 168,840.00

0.2 org Pekerja Trampil 65,000.00 13,000.00


0.1 org Tukang Listrik 80,000.00 8,000.00
0.1 org Kepala Tk Listrik 90,000.00 4,500.00
0.1 org Mandor 90,000.00 4,500.00 30,000.00
Jumlah 198,840.00
1 BH PENGADAAN DAN PEMASANGAN STOP KONTAK 1 PHASE
Bahan :
1 bh Stop Kontak 1 Phase 12,500.00 12,500.00
10 m' Kabel NYM 3 x 1,5 sqmm 6,440.00 64,400.00
10 m' Conduit dia. 15,8 mm (5/8") 3,100.00 31,000.00
1 bh Kotak Sambung / T- Dus 3,500.00 3,500.00
10 bh Klem Pipa 5/8" 330.00 3,300.00 114,700.00
1 ls Material Bantu 34,410.00 149,110.00
Tenaga Kerja :
0.2 org Pekerja Trampil 65,000.00 13,000.00
0.1 org Tukang Listrik 80,000.00 8,000.00
0.05 org Kepala Tk Listrik 90,000.00 4,500.00
0.05 org Mandor 90,000.00 4,500.00 30,000.00
Jumlah 179,110.00

1 BH PENGADAAN DAN PEMASANGAN SAKLAR TUNGGAL


Bahan :
1 bh Saklar Tunggal 11,500.00 11,500.00
10 m' Kabel NYM 2 x 1,5 sqmm 6,440.00 64,400.00
10 m' Conduit dia. 15,8 mm (5/8") 3,100.00 31,000.00
1 bh Kotak Sambung / T- Dus 3,500.00 3,500.00
10 bh Klem Pipa 5/8" 330.00 3,300.00 113,700.00
1 ls Material Bantu 34,110.00 147,810.00
Tenaga Kerja :
0.2 org Pekerja Trampil 65,000.00 13,000.00
0.1 org Tukang Listrik 80,000.00 8,000.00
0.05 org Kepala Tk Listrik 90,000.00 4,500.00
0.05 org Mandor 90,000.00 4,500.00 30,000.00
Jumlah 177,810.00
RINCIAN RENCANA ANGGARAN BIAYA (RAB)
PRASARANA SMK PEMBANGUNAN RUANG PRAKTEK SISWA
HARGA JUMLAH
NO ITEM PEKERJAAN SAT VOL
SATUAN HARGA
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pengukuran dan Bouplank LS 1 1,000,000.00 1,000,000.00
2 Papan Nama Proyek LS 1 500,000.00 500,000.00
3 Pembuatan steiger dari bambu LS 1 1,300,000.00 1,300,000.00

SUB JUMLAH I 2,800,000.00

II PEKERJAAN GALIAN DAN PONDASI


1 Galian Tanah M3 48.95 27,600.00 1,350,882.00
2 Urugan Tanah M2 45.50 117,900.00 5,364,567.90
3 Pondasi Foot Plat
- Pembesian Kg 675 12,702.50 8,574,187.50
- Bekisting M2 36.0 90,510.00 3,258,360.00
- Beton AD. 1:2:3 M3 6.75 818,295.00 5,523,491.25
4 Pasangan Pondasi Rolak M2 61.2 95,770.00 5,861,124.00

SUB JUMLAH II 29,932,612.65

III PEKERJAAN BETON/PEMBESIAN


1 SLOOF 25/35
- Pembesian Kg 893 12,702.50 11,336,981.25
- Bekisting M2 71.4 82,562.50 5,894,962.50
- Beton AD. 1:2:3 M3 8.93 818,295.00 7,303,282.88
2 KOLOM (K1)
- Pengerjaan Besi WF Kg 2,809.9 16,157.00 45,400,313.68
- Bekisting M2 81.6 82,562.50 6,737,100.00
- Beton AD. 1:2:3 M3 6 818,295.00 4,868,855.25
3 KOLOM (K2)
- Pembesian Kg 432.0 12,702.50 5,487,480.00
- Bekisting M2 144 82,562.50 11,889,000.00
- Beton AD. 1:2:3 M3 11.00 11,632.50 122,141.25
4 BALOK IWF
- Pengerjaan Besi WF Kg 3,994.00 16,157.00 64,531,058.00
5 BALOK PENGUAT KUSEN
- Pembesian Kg 126.550 16,157.00 2,044,668.35
- Bekisting M2 26.64 82,562.50 2,199,465.00
- Beton AD. 1:2:3 M3 1.19 818,295.00 972,134.46
6 ATAP BETON K250
- Wiremesh dia 8mm - 150 M2 240.000 49,000.00 11,760,000.00
- Bondek 0.75 M2 240.00 205,000.00 49,200,000.00
- Beton K225 M3 28.80 1,353,987.50 38,994,840.00

SUB JUMLAH II 268,742,282.61

IV PEKERJAAN PASANGAN DINDING BATA


1 Pasangan Dinding Bata AD. 1:5 M2 275.84 95,770.00 26,417,196.80
2 Plesteran Dinding Bata AD. 1:5 + Acian M2 551.70 65,918.00 36,365,642.24

SUB JUMLAH III 62,782,839.04

V PEKERJAAN KUSEN PINTU DAN JENDELA


1 P1 (uk. 220x150) Kusen Alumunium Daun Rangka Kayu Lapis Triplek UNIT 2.00 2,000,000.00 4,000,000.00
2 J1 (uk. 220x140) Kusen daun Jendela Alumunium UNIT 6.00 2,800,000.00 16,800,000.00
3 Bofenlife Kusen Alumunium UNIT 8 700,000 5,600,000.00

SUB JUMLAH IV 26,400,000.00

VI PEKERJAAN MENGECAT
1 Pengecatan tembok ex Vinilex M2 551.70 19,112.00 10,543,708.16
HARGA JUMLAH
NO ITEM PEKERJAAN SAT VOL
SATUAN HARGA
1 2 3 4 5 6
SUB JUMLAH VI 10,543,708.16

VII PEKERJAAN LANTAI DAN PLAFON


HARGA JUMLAH
NO ITEM PEKERJAAN SAT VOL
SATUAN HARGA
1 2 3 4 5 6
1 Pemasangan Lantai Keramik 40x40 M2 240.00 124,090.00 29,781,600.00
2 Pasang Plafon rangka Hollo lapis Gypsum M2 240 117,155.01 28,117,202.67
3 Pasang List Gypsum M 112 30,685.00 3,436,720.00

SUB JUMLAH VII 61,335,522.67

VIII PEKERJAAN LISTRIK


1 Pemasangan titik saklar ex brocco BH 6.00 177,810.00 1,066,860.00
2 Pemasangan titik stop kontak ex brocco BH 18 179,110.00 3,223,980.00
3 Pemasangan lampu downlight (lengkap accessories) BH 18 198,840.00 3,579,120.00

SUB JUMLAH VIII 7,869,960.00

IX PEKERJAAN LAIN

1 Beton tumbuk untuk tritisan M3 2.00 816,245.00 1,665,139.80


2 Pasangan Bata Merah untuk Drainase M2 34.0 95,770.00 3,256,180.00
3 Pembersihan Lokasi Pekerjaan LS 1.0 1,600,000.00 1,600,000.00

SUB JUMLAH IX 6,521,319.80

SUB JUMLAH IX 11,377,499.80

JUMLAH TOTAL 476,928,000.00


TERBILANG : EMPAT RATUS TUJUH PULUH ENAM JUTA SEMBILAN RATUS DUA PULUH DELAPAN RIBU RUPIAH

Cirebon, …. Juni 2017


Ketua Tim Perencana & Pengawas Kepala SMKN 1 Lemahabang

ESAK KHAIDIR, ST H. WIRYO S


NIP. 19591218 1984 03 1 008
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)
PRASARANA SMK PEMBANGUNAN RUANG PRAKTEK SISWA
TAHUN 2017

NO SUB PEKERJAAN HARGA (RP)

I PEKERJAAN PERSIAPAN 3,000,000.00


II PENGUKURAN LAPANGAN 2,500,000.00
III PEK. TANAH & PASIR 12,500,000.00
IV PEK. PASANGAN BATA 10,000,000.00
V PEK. PLESTERAN DAN LANTAI 15,000,000.00
VI PEKERJAAN BETON 45,000,000.00
VII PEK. ATAP DAN PLAFOND 32,000,000.00
VIII PEKERJAAN KAYU 25,000,000.00
IX PEKERJAAN M / E 35,000,000.00
JUMLAH TOTAL BIAYA KONTRUKSI 180,000,000.00

TERBILANG : EMPAT RATUS TUJUH PULUH ENAM JUTA SEMBILAN RATUS DUA PULUH DELAPAN RIBU RUPIAH

Cirebon, …. Juni 2017


Ketua Tim Perencana & Pengawas Kepala SMKN 1 Lemahabang

ESAK KHAIDIR, ST H. WIRYO SANTOSO, M. M.Pd


NIP. 19591218 1984 03 1 008
JADWAL PELAKSANAAN PRASARANA PEMBANGUNAN RUANG PRAKTEK SISWA

BULAN ……………….. BULAN ……………….. BULAN ……………….. BULAN ………………..


NO JENIS PEKERJAAN BOBOT MINGGU KE KET
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 PEKERJAAN PERSIAPAN 1.67 1.67 100
2 PEKERJAAN GALIAN DAN PONDASI 1.39 0.69 0.69 90
3 PEKERJAAN BETON/PEMBESIAN 6.94 0.6944 0.6944 0.6944 0.6944 0.6944 0.6944 0.6944 0.6944 0.6944 0.6944 80
4 PEKERJAAN PASANGAN DINDING BATA 5.56 0.7937 0.7937 0.7937 0.7937 0.7937 0.7937 0.7937 70
5 PEKERJAAN KUSEN PINTU DAN JENDELA 8.33 4.1667 4.1667 60
6 PEKERJAAN MENGECAT 25.00 12.5 12.5 50
7 PEKERJAAN LANTAI 17.78 5.9259 5.9259 5.9259 40
8 PEKERJAAN LISTRIK 13.89 13.89 30
9 PEKERJAAN LAIN 19.44 19.44 20
RENCANA BOBOT PRESTASI 1.67 0.6944 1.3889 0.6944 0.6944 1.4881 1.4881 1.4881 1.4881 1.4881 1.4881 1.4881 10.093 10.093 18.426 45.833 10
RENCANA BOBOT AKUMULATIF 1.67 2.36 3.75 4.44 5.14 6.63 8.12 9.60 11.09 12.58 14.07 15.56 25.65 35.74 54.17 100 0

Cirebon, …. Juni 2017


Ketua Tim Perencana & Pengawas Kepala SMKN 1 Lemahabang

ESAK KHAIDIR, ST H. WIRYO SANTOSO, M. M.Pd


NIP. 19591218 1984 03 1 008
LAMPIRAN BERITA ACARA PEMERIKSAAN KEMAJUAN PEKERJAAN PEMBANGUNAN RUANG PRAKTEK SISWA
SMK NEGERI 1 LEMAHABANG

LAPORAN KEMAJUAN PEKERJAAN


WAKTU PELAKSANAAN PEKERJAAN : 120 HARI KALENDER
MINGGU KE : 1 ( DARI TGL 16 JUNI 2017 S.D. TGL. 22 JUNI 2017 )

NILAI TAHAP
BOBOT
NO ITEM PEKERJAAN SAT VOL BOBOT PENYELESAIAN

% MNGGU S.D MGG INI %


1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pengukuran dan Bouplank LS 1 0.21 0.00 0.21
2 Papan Nama Proyek LS 1 0.10 0.00 0.10
3 Pembuatan steiger dari bambu LS 1 0.27 0.00 0.27

II PEKERJAAN GALIAN DAN PONDASI


1 Galian Tanah M3 48.95 0.28 0.00 0.28
2 Urugan Tanah M2 45.50 1.12 0.00 1.12
3 Pondasi Foot Plat
- Pembesian Kg 675 1.80 0.00 0.00
- Bekisting M2 36.0 0.68 0.00 0.00
- Beton AD. 1:2:3 M3 6.75 1.16 0.00 0.00
4 Pasangan Pondasi Rolak M2 61.2 1.23 0.00 0.00

III PEKERJAAN BETON/PEMBESIAN


1 SLOOF 25/35
- Pembesian Kg 893 2.38
- Bekisting M2 71.4 1.24
- Beton AD. 1:2:3 M3 8.93 1.53
2 KOLOM (K1)
- Pengerjaan Besi WF Kg 2,809.9 9.52
- Bekisting M2 81.6 1.41
- Beton AD. 1:2:3 M3 6 1.02
3 KOLOM (K2)
- Pembesian Kg 432.0 1.15
- Bekisting M2 144 2.49
- Beton AD. 1:2:3 M3 11.00 0.03
4 BALOK IWF
- Pengerjaan Besi WF Kg 3,994.00 13.53
5 BALOK PENGUAT KUSEN
- Pembesian Kg 126.550 0.43
- Bekisting M2 26.64 0.46
- Beton AD. 1:2:3 M3 1.19 0.20
6 ATAP BETON K250
- Wiremesh dia 8mm - 150 M2 240.000 2.47
- Bondek 0.75 M2 240.00 10.32
- Beton K225 M3 28.80 8.18

IV PEKERJAAN PASANGAN DINDING BATA


1 Pasangan Dinding Bata AD. 1:5 M2 275.84 13.16 0.00 0.00
2 Plesteran Dinding Bata AD. 1:5 + Acian M2 551.7 0.00 0.00 0.00

V PEKERJAAN KUSEN PINTU DAN JENDELA


1 P1 (uk. 220x150) Kusen Alumunium Daun Rangka Kayu Lapis Tripl UNIT 2 1.17 0.00 0.00
NILAI TAHAP
BOBOT
NO ITEM PEKERJAAN SAT VOL BOBOT PENYELESAIAN

% MNGGU S.D MGG INI %


1 2 3 4 5 6
2 J1 (uk. 220x140) Kusen daun Jendela Alumunium UNIT 6 5.54 0.00 0.00
3 Bofenlife Kusen Alumunium UNIT 8

VI PEKERJAAN MENGECAT 2.21 0.00 0.00


1 Pengecatan tembok ex Vinilex M2 551.7 2.21 0.00 0.00

VII PEKERJAAN LANTAI DAN PLAFON


1 Pemasangan Lantai Keramik 40x40 M2 240 5.90 0.00 0.00
2 Pasang Plafon rangka Hollo lapis Gypsum M2 240 0.72 0.00 0.00
3 Pasang List Gypsum M 112 12.86 0.00 0.00

VIII PEKERJAAN LISTRIK


1 Pemasangan titik saklar ex brocco BH 6 0.68 0.00 0.00
3 Pemasangan titik stop kontak ex brocco BH 18 0.75 0.00 0.00
4 Pemasangan lampu downlight (lengkap accessories) BH 18 1.65 0.00 0.00

IX PEKERJAAN LAIN
1 Beton tumbuk untuk tritisan M3 2.0 0.68 0.00 0.00

2 Pasangan Bata Merah untuk Drainase M2 34.0 0.34 0.00 0.00

3 Pembersihan Lokasi Pekerjaan LS 1 1.37 0.00 0.00

Kepala SMKN 1 Lemahabang Ketua Tim Perencana & Pengawas

H. WIRYO SANTOSO, M. M.Pd ESAK KHAIDIR, ST


NIP. 19591218 1984 03 1 008
KTEK SISWA

PRESTASI
TERHADAP
KESELURUHAN
%
7
PRESTASI
TERHADAP
KESELURUHAN
%
7

erencana & Pengawas

K KHAIDIR, ST
LAMPIRAN BERITA ACARA PEMERIKSAAN KEMAJUAN PEKERJAAN PEMBANGUNAN RUANG PRAKTEK SISWA
SMK NEGERI 1 LEMAHABANG

LAPORAN KEMAJUAN PEKERJAAN


WAKTU PELAKSANAAN PEKERJAAN : 120 HARI KALENDER
MINGGU KE : 2 ( DARI TGL 3 JULI 2017 S.D. TGL. 9 JULI 2017 )

NILAI TAHAP
BOBOT
NO ITEM PEKERJAAN SAT VOL BOBOT PENYELESAIAN

% MNGGU S.D MGG INI %


1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pengukuran dan Bouplank LS 1 0.21 0.00 0.21
2 Papan Nama Proyek LS 1 0.10 0.00 0.10
3 Pembuatan steiger dari bambu LS 1 0.27 0.00 0.27

II PEKERJAAN GALIAN DAN PONDASI


1 Galian Tanah M3 48.95 0.28 0.00 0.28
2 Urugan Tanah M2 45.50 1.12 0.00 1.12
3 Pondasi Foot Plat
- Pembesian Kg 675 1.80 0.00 0.00
- Bekisting M2 36.0 0.68 0.00 0.00
- Beton AD. 1:2:3 M3 6.75 1.16 0.00 0.00
4 Pasangan Pondasi Rolak M2 61.2 1.23 0.00 0.00

III PEKERJAAN BETON/PEMBESIAN


1 SLOOF 25/35
- Pembesian Kg 893 2.38 0.00 0.00
- Bekisting M2 71.4 1.24 0.00 0.00
- Beton AD. 1:2:3 M3 8.93 1.53 0.00 0.00
2 KOLOM 30/30
- Pembesian Kg 1,080.0 9.52 0.00 0.00
- Bekisting M2 144.0 1.41 0.00 0.00
- Beton AD. 1:2:3 M3 11 1.02 0.00 0.00
3 BALOK 25/30
- Pembesian Kg 765.0 1.15 0.00 0.00
- Bekisting M2 87 2.49 0.00 0.00
- Beton AD. 1:2:3 M3 7.65 0.03 0.00 0.00
4 BALOK PENGUAT KUSEN
- Pembesian Kg 118.58 13.53 0.00 0.00
- Bekisting M2 26.64 0.00 0.00 0.00
- Beton AD. 1:2:3 M3 1.188 0.43 0.00 0.00
5 ATAP BETON K250
- Wiremesh dia 8mm - 150 M2 240.00 0.20 0.00 0.00
- Bondek 0.75 M2 240.00 0.00 0.00 0.00
- Beton K225 M3 28.800 2.47 0.00 0.00
6 CANOPY BETON
- Pembesian KG 201.28 8.18 0.00 0.00
- Bekisting M2 43.20 56.35 0.00 0.00
- Beton AD M3 2.02 0.00 0.00 0.00

IV PEKERJAAN PASANGAN DINDING BATA


1 Pasangan Dinding Bata AD. 1:5 M2 275.84 13.16 0.00 0.00
2 Plesteran Dinding Bata AD. 1:5 + Acian M2 551.7 0.00 0.00 0.00
NILAI TAHAP
BOBOT
NO ITEM PEKERJAAN SAT VOL BOBOT PENYELESAIAN

% MNGGU S.D MGG INI %


1 2 3 4 5 6
V PEKERJAAN KUSEN PINTU DAN JENDELA
1 P1 (uk. 220x150) Kusen Alumunium Daun Rangka Kayu Lapis Tripl UNIT 2 1.17 0.00 0.00
NILAI TAHAP
BOBOT
NO ITEM PEKERJAAN SAT VOL BOBOT PENYELESAIAN

% MNGGU S.D MGG INI %


1 2 3 4 5 6
2 J1 (uk. 220x140) Kusen daun Jendela Alumunium UNIT 14 5.54 0.00 0.00

VI PEKERJAAN MENGECAT 2.21 0.00 0.00


1 Pengecatan tembok ex Vinilex M2 551.7 2.21 0.00 0.00

VII PEKERJAAN LANTAI DAN PLAFON


1 Pemasangan Lantai Keramik 40x40 M2 240 5.90 0.00 0.00
2 Pasang Plafon rangka Hollo lapis Gypsum M2 240 0.72 0.00 0.00
3 Pasang List Gypsum M 112 12.86 0.00 0.00

VIII PEKERJAAN LISTRIK


1 Pemasangan titik saklar ex brocco BH 6 0.68 0.00 0.00
3 Pemasangan titik stop kontak ex brocco BH 18 0.75 0.00 0.00
4 Pemasangan lampu downlight (lengkap accessories) BH 18 1.65 0.00 0.00

IX PEKERJAAN LAIN
1 Beton tumbuk untuk tritisan M3 2.0 0.68 0.00 0.00

2 Pasangan Bata Merah untuk Drainase M2 34.0 0.34 0.00 0.00

3 Pembersihan Lokasi Pekerjaan LS 1 1.37 0.00 0.00

Kepala SMKN 1 Lemahabang Ketua Tim Perencana & Pengawas

H. WIRYO SANTOSO, M. M.Pd ESAK KHAIDIR, ST


NIP. 19591218 1984 03 1 008
KTEK SISWA

PRESTASI
TERHADAP
KESELURUHAN
%
7
PRESTASI
TERHADAP
KESELURUHAN
%
7
PRESTASI
TERHADAP
KESELURUHAN
%
7

erencana & Pengawas

K KHAIDIR, ST
LAMPIRAN BERITA ACARA PEMERIKSAAN KEMAJUAN PEKERJAAN PEMBANGUNAN RUANG PRAKTEK SISWA
SMK NEGERI 1 LEMAHABANG

LAPORAN KEMAJUAN PEKERJAAN


WAKTU PELAKSANAAN PEKERJAAN : 120 HARI KALENDER
MINGGU KE : 3 ( DARI TGL 10 JULI 2017 S.D. TGL. 16 JULI 2017 )

NILAI TAHAP
BOBOT
NO ITEM PEKERJAAN SAT VOL BOBOT PENYELESAIAN

% MNGGU S.D MGG INI %


1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pengukuran dan Bouplank LS 1 0.21 0.00 0.21
2 Papan Nama Proyek LS 1 0.10 0.00 0.10
3 Pembuatan steiger dari bambu LS 1 0.27 0.00 0.27

II PEKERJAAN GALIAN DAN PONDASI


1 Galian Tanah M3 48.95 0.28 0.00 0.28
2 Urugan Tanah M2 45.50 1.12 0.00 1.12
3 Pondasi Foot Plat
- Pembesian Kg 675 1.80 0.00 0.00
- Bekisting M2 36.0 0.68 0.00 0.00
- Beton AD. 1:2:3 M3 6.75 1.16 0.00 0.00
4 Pasangan Pondasi Rolak M2 61.2 1.23 0.00 0.00

III PEKERJAAN BETON/PEMBESIAN


1 SLOOF 25/35
- Pembesian Kg 893 2.38 0.00 0.00
- Bekisting M2 71.4 1.24 0.00 0.00
- Beton AD. 1:2:3 M3 8.93 1.53 0.00 0.00
2 KOLOM 30/30
- Pembesian Kg 1,080.0 9.52 0.00 0.00
- Bekisting M2 144.0 1.41 0.00 0.00
- Beton AD. 1:2:3 M3 11 1.02 0.00 0.00
3 BALOK 25/30
- Pembesian Kg 765.0 1.15 0.00 0.00
- Bekisting M2 87 2.49 0.00 0.00
- Beton AD. 1:2:3 M3 7.65 0.03 0.00 0.00
4 BALOK PENGUAT KUSEN
- Pembesian Kg 118.58 13.53 0.00 0.00
- Bekisting M2 26.64 0.00 0.00 0.00
- Beton AD. 1:2:3 M3 1.188 0.43 0.00 0.00
5 ATAP BETON K250
- Wiremesh dia 8mm - 150 M2 240.00 0.20 0.00 0.00
- Bondek 0.75 M2 240.00 0.00 0.00 0.00
- Beton K225 M3 28.800 2.47 0.00 0.00
6 CANOPY BETON
- Pembesian KG 201.28 8.18 0.00 0.00
- Bekisting M2 43.20 56.35 0.00 0.00
- Beton AD M3 2.02 0.00 0.00 0.00

IV PEKERJAAN PASANGAN DINDING BATA


1 Pasangan Dinding Bata AD. 1:5 M2 275.84 13.16 0.00 0.00
2 Plesteran Dinding Bata AD. 1:5 + Acian M2 551.7 0.00 0.00 0.00
NILAI TAHAP
BOBOT
NO ITEM PEKERJAAN SAT VOL BOBOT PENYELESAIAN

% MNGGU S.D MGG INI %


1 2 3 4 5 6
V PEKERJAAN KUSEN PINTU DAN JENDELA
1 P1 (uk. 220x150) Kusen Alumunium Daun Rangka Kayu Lapis Tripl UNIT 2 1.17 0.00 0.00
NILAI TAHAP
BOBOT
NO ITEM PEKERJAAN SAT VOL BOBOT PENYELESAIAN

% MNGGU S.D MGG INI %


1 2 3 4 5 6
2 J1 (uk. 220x140) Kusen daun Jendela Alumunium UNIT 14 5.54 0.00 0.00

VI PEKERJAAN MENGECAT 2.21 0.00 0.00


1 Pengecatan tembok ex Vinilex M2 551.7 2.21 0.00 0.00

VII PEKERJAAN LANTAI DAN PLAFON


1 Pemasangan Lantai Keramik 40x40 M2 240 5.90 0.00 0.00
2 Pasang Plafon rangka Hollo lapis Gypsum M2 240 0.72 0.00 0.00
3 Pasang List Gypsum M 112 12.86 0.00 0.00

VIII PEKERJAAN LISTRIK


1 Pemasangan titik saklar ex brocco BH 6 0.68 0.00 0.00
3 Pemasangan titik stop kontak ex brocco BH 18 0.75 0.00 0.00
4 Pemasangan lampu downlight (lengkap accessories) BH 18 1.65 0.00 0.00

IX PEKERJAAN LAIN
1 Beton tumbuk untuk tritisan M3 2.0 0.68 0.00 0.00

2 Pasangan Bata Merah untuk Drainase M2 34.0 0.34 0.00 0.00

3 Pembersihan Lokasi Pekerjaan LS 1 1.37 0.00 0.00

Kepala SMKN 1 Lemahabang Ketua Tim Perencana & Pengawas

H. WIRYO SANTOSO, M. M.Pd ESAK KHAIDIR, ST


NIP. 19591218 1984 03 1 008
KTEK SISWA

PRESTASI
TERHADAP
KESELURUHAN
%
7
PRESTASI
TERHADAP
KESELURUHAN
%
7
PRESTASI
TERHADAP
KESELURUHAN
%
7

erencana & Pengawas

K KHAIDIR, ST
LAMPIRAN BERITA ACARA PEMERIKSAAN KEMAJUAN PEKERJAAN PEMBANGUNAN RUANG PRAKTEK SISWA
SMK NEGERI 1 LEMAHABANG

LAPORAN KEMAJUAN PEKERJAAN


WAKTU PELAKSANAAN PEKERJAAN : 120 HARI KALENDER
MINGGU KE : 4 ( DARI TGL 17 JULI 2017 S.D. TGL. 23 JULI 2017 )

NILAI TAHAP
BOBOT
NO ITEM PEKERJAAN SAT VOL BOBOT PENYELESAIAN

% MNGGU S.D MGG INI %


1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pengukuran dan Bouplank LS 1 0.21 0.00 0.21
2 Papan Nama Proyek LS 1 0.10 0.00 0.10
3 Pembuatan steiger dari bambu LS 1 0.27 0.00 0.27

II PEKERJAAN GALIAN DAN PONDASI


1 Galian Tanah M3 48.95 0.28 0.00 0.28
2 Urugan Tanah M2 45.50 1.12 0.00 1.12
3 Pondasi Foot Plat
- Pembesian Kg 675 1.80 0.00 0.00
- Bekisting M2 36.0 0.68 0.00 0.00
- Beton AD. 1:2:3 M3 6.75 1.16 0.00 0.00
4 Pasangan Pondasi Rolak M2 61.2 1.23 0.00 0.00

III PEKERJAAN BETON/PEMBESIAN


1 SLOOF 25/35
- Pembesian Kg 893 2.38 0.00 0.00
- Bekisting M2 71.4 1.24 0.00 0.00
- Beton AD. 1:2:3 M3 8.93 1.53 0.00 0.00
2 KOLOM 30/30
- Pembesian Kg 1,080.0 9.52 0.00 0.00
- Bekisting M2 144.0 1.41 0.00 0.00
- Beton AD. 1:2:3 M3 11 1.02 0.00 0.00
3 BALOK 25/30
- Pembesian Kg 765.0 1.15 0.00 0.00
- Bekisting M2 87 2.49 0.00 0.00
- Beton AD. 1:2:3 M3 7.65 0.03 0.00 0.00
4 BALOK PENGUAT KUSEN
- Pembesian Kg 118.58 13.53 0.00 0.00
- Bekisting M2 26.64 0.00 0.00 0.00
- Beton AD. 1:2:3 M3 1.188 0.43 0.00 0.00
5 ATAP BETON K250
- Wiremesh dia 8mm - 150 M2 240.00 0.20 0.00 0.00
- Bondek 0.75 M2 240.00 0.00 0.00 0.00
- Beton K225 M3 28.800 2.47 0.00 0.00
6 CANOPY BETON
- Pembesian KG 201.28 8.18 0.00 0.00
- Bekisting M2 43.20 56.35 0.00 0.00
- Beton AD M3 2.02 0.00 0.00 0.00

IV PEKERJAAN PASANGAN DINDING BATA


1 Pasangan Dinding Bata AD. 1:5 M2 275.84 13.16 0.00 0.00
2 Plesteran Dinding Bata AD. 1:5 + Acian M2 551.7 0.00 0.00 0.00
NILAI TAHAP
BOBOT
NO ITEM PEKERJAAN SAT VOL BOBOT PENYELESAIAN

% MNGGU S.D MGG INI %


1 2 3 4 5 6
V PEKERJAAN KUSEN PINTU DAN JENDELA
1 P1 (uk. 220x150) Kusen Alumunium Daun Rangka Kayu Lapis Tripl UNIT 2 1.17 0.00 0.00
NILAI TAHAP
BOBOT
NO ITEM PEKERJAAN SAT VOL BOBOT PENYELESAIAN

% MNGGU S.D MGG INI %


1 2 3 4 5 6
2 J1 (uk. 220x140) Kusen daun Jendela Alumunium UNIT 14 5.54 0.00 0.00

VI PEKERJAAN MENGECAT 2.21 0.00 0.00


1 Pengecatan tembok ex Vinilex M2 551.7 2.21 0.00 0.00

VII PEKERJAAN LANTAI DAN PLAFON


1 Pemasangan Lantai Keramik 40x40 M2 240 5.90 0.00 0.00
2 Pasang Plafon rangka Hollo lapis Gypsum M2 240 0.72 0.00 0.00
3 Pasang List Gypsum M 112 12.86 0.00 0.00

VIII PEKERJAAN LISTRIK


1 Pemasangan titik saklar ex brocco BH 6 0.68 0.00 0.00
3 Pemasangan titik stop kontak ex brocco BH 18 0.75 0.00 0.00
4 Pemasangan lampu downlight (lengkap accessories) BH 18 1.65 0.00 0.00

IX PEKERJAAN LAIN
1 Beton tumbuk untuk tritisan M3 2.0 0.68 0.00 0.00

2 Pasangan Bata Merah untuk Drainase M2 34.0 0.34 0.00 0.00

3 Pembersihan Lokasi Pekerjaan LS 1 1.37 0.00 0.00

Kepala SMKN 1 Lemahabang Ketua Tim Perencana & Pengawas

H. WIRYO SANTOSO, M. M.Pd ESAK KHAIDIR, ST


NIP. 19591218 1984 03 1 008
KTEK SISWA

PRESTASI
TERHADAP
KESELURUHAN
%
7
PRESTASI
TERHADAP
KESELURUHAN
%
7
PRESTASI
TERHADAP
KESELURUHAN
%
7

erencana & Pengawas

K KHAIDIR, ST
LAMPIRAN BERITA ACARA PEMERIKSAAN KEMAJUAN PEKERJAAN PEMBANGUNAN RUANG PRAKTEK SISWA
SMK NEGERI 1 LEMAHABANG

LAPORAN KEMAJUAN PEKERJAAN


WAKTU PELAKSANAAN PEKERJAAN : 120 HARI KALENDER
MINGGU KE : 4 ( DARI TGL 17 JULI 2017 S.D. TGL. 23 JULI 2017 )

NILAI TAHAP
BOBOT
NO ITEM PEKERJAAN SAT VOL BOBOT PENYELESAIAN

% MNGGU S.D MGG INI %


1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pengukuran dan Bouplank LS 1 0.21 0.00 0.21
2 Papan Nama Proyek LS 1 0.10 0.00 0.10
3 Pembuatan steiger dari bambu LS 1 0.27 0.00 0.27

II PEKERJAAN GALIAN DAN PONDASI


1 Galian Tanah M3 48.95 0.28 0.00 0.28
2 Urugan Tanah M2 45.50 1.12 0.00 1.12
3 Pondasi Foot Plat
- Pembesian Kg 675 1.80 0.00 0.00
- Bekisting M2 36.0 0.68 0.00 0.00
- Beton AD. 1:2:3 M3 6.75 1.16 0.00 0.00
4 Pasangan Pondasi Rolak M2 61.2 1.23 0.00 0.00

III PEKERJAAN BETON/PEMBESIAN


1 SLOOF 25/35
- Pembesian Kg 893 2.38 0.00 0.00
- Bekisting M2 71.4 1.24 0.00 0.00
- Beton AD. 1:2:3 M3 8.93 1.53 0.00 0.00
2 KOLOM 30/30
- Pembesian Kg 1,080.0 9.52 0.00 0.00
- Bekisting M2 144.0 1.41 0.00 0.00
- Beton AD. 1:2:3 M3 11 1.02 0.00 0.00
3 BALOK 25/30
- Pembesian Kg 765.0 1.15 0.00 0.00
- Bekisting M2 87 2.49 0.00 0.00
- Beton AD. 1:2:3 M3 7.65 0.03 0.00 0.00
4 BALOK PENGUAT KUSEN
- Pembesian Kg 118.58 13.53 0.00 0.00
- Bekisting M2 26.64 0.00 0.00 0.00
- Beton AD. 1:2:3 M3 1.188 0.43 0.00 0.00
5 ATAP BETON K250
- Wiremesh dia 8mm - 150 M2 240.00 0.20 0.00 0.00
- Bondek 0.75 M2 240.00 0.00 0.00 0.00
- Beton K225 M3 28.800 2.47 0.00 0.00
6 CANOPY BETON
- Pembesian KG 201.28 8.18 0.00 0.00
- Bekisting M2 43.20 56.35 0.00 0.00
- Beton AD M3 2.02 0.00 0.00 0.00

IV PEKERJAAN PASANGAN DINDING BATA


1 Pasangan Dinding Bata AD. 1:5 M2 275.84 13.16 0.00 0.00
2 Plesteran Dinding Bata AD. 1:5 + Acian M2 551.7 0.00 0.00 0.00
NILAI TAHAP
BOBOT
NO ITEM PEKERJAAN SAT VOL BOBOT PENYELESAIAN

% MNGGU S.D MGG INI %


1 2 3 4 5 6
V PEKERJAAN KUSEN PINTU DAN JENDELA
1 P1 (uk. 220x150) Kusen Alumunium Daun Rangka Kayu Lapis Tripl UNIT 2 1.17 0.00 0.00
NILAI TAHAP
BOBOT
NO ITEM PEKERJAAN SAT VOL BOBOT PENYELESAIAN

% MNGGU S.D MGG INI %


1 2 3 4 5 6
2 J1 (uk. 220x140) Kusen daun Jendela Alumunium UNIT 14 5.54 0.00 0.00

VI PEKERJAAN MENGECAT 2.21 0.00 0.00


1 Pengecatan tembok ex Vinilex M2 551.7 2.21 0.00 0.00

VII PEKERJAAN LANTAI DAN PLAFON


1 Pemasangan Lantai Keramik 40x40 M2 240 5.90 0.00 0.00
2 Pasang Plafon rangka Hollo lapis Gypsum M2 240 0.72 0.00 0.00
3 Pasang List Gypsum M 112 12.86 0.00 0.00

VIII PEKERJAAN LISTRIK


1 Pemasangan titik saklar ex brocco BH 6 0.68 0.00 0.00
3 Pemasangan titik stop kontak ex brocco BH 18 0.75 0.00 0.00
4 Pemasangan lampu downlight (lengkap accessories) BH 18 1.65 0.00 0.00

IX PEKERJAAN LAIN
1 Beton tumbuk untuk tritisan M3 2.0 0.68 0.00 0.00

2 Pasangan Bata Merah untuk Drainase M2 34.0 0.34 0.00 0.00

3 Pembersihan Lokasi Pekerjaan LS 1 1.37 0.00 0.00

Kepala SMKN 1 Lemahabang Ketua Tim Perencana & Pengawas

H. WIRYO SANTOSO, M. M.Pd ESAK KHAIDIR, ST


NIP. 19591218 1984 03 1 008
KTEK SISWA

PRESTASI
TERHADAP
KESELURUHAN
%
7
PRESTASI
TERHADAP
KESELURUHAN
%
7
PRESTASI
TERHADAP
KESELURUHAN
%
7

erencana & Pengawas

K KHAIDIR, ST
LAMPIRAN BERITA ACARA PEMERIKSAAN KEMAJUAN PEKERJAAN PEMBANGUNAN RUANG PRAKTEK SISWA
SMK NEGERI 1 LEMAHABANG

LAPORAN KEMAJUAN PEKERJAAN


WAKTU PELAKSANAAN PEKERJAAN : 120 HARI KALENDER
MINGGU KE : 4 ( DARI TGL 17 JULI 2017 S.D. TGL. 23 JULI 2017 )

NILAI TAHAP
BOBOT
NO ITEM PEKERJAAN SAT VOL BOBOT PENYELESAIAN

% MNGGU S.D MGG INI %


1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pengukuran dan Bouplank LS 1 0.21 0.00 0.21
2 Papan Nama Proyek LS 1 0.10 0.00 0.10
3 Pembuatan steiger dari bambu LS 1 0.27 0.00 0.27

II PEKERJAAN GALIAN DAN PONDASI


1 Galian Tanah M3 48.95 0.28 0.00 0.28
2 Urugan Tanah M2 45.50 1.12 0.00 1.12
3 Pondasi Foot Plat
- Pembesian Kg 675 1.80 0.00 0.00
- Bekisting M2 36.0 0.68 0.00 0.00
- Beton AD. 1:2:3 M3 6.75 1.16 0.00 0.00
4 Pasangan Pondasi Rolak M2 61.2 1.23 0.00 0.00

III PEKERJAAN BETON/PEMBESIAN


1 SLOOF 25/35
- Pembesian Kg 893 2.38 0.00 0.00
- Bekisting M2 71.4 1.24 0.00 0.00
- Beton AD. 1:2:3 M3 8.93 1.53 0.00 0.00
2 KOLOM 30/30
- Pembesian Kg 1,080.0 9.52 0.00 0.00
- Bekisting M2 144.0 1.41 0.00 0.00
- Beton AD. 1:2:3 M3 11 1.02 0.00 0.00
3 BALOK 25/30
- Pembesian Kg 765.0 1.15 0.00 0.00
- Bekisting M2 87 2.49 0.00 0.00
- Beton AD. 1:2:3 M3 7.65 0.03 0.00 0.00
4 BALOK PENGUAT KUSEN
- Pembesian Kg 118.58 13.53 0.00 0.00
- Bekisting M2 26.64 0.00 0.00 0.00
- Beton AD. 1:2:3 M3 1.188 0.43 0.00 0.00
5 ATAP BETON K250
- Wiremesh dia 8mm - 150 M2 240.00 0.20 0.00 0.00
- Bondek 0.75 M2 240.00 0.00 0.00 0.00
- Beton K225 M3 28.800 2.47 0.00 0.00
6 CANOPY BETON
- Pembesian KG 201.28 8.18 0.00 0.00
- Bekisting M2 43.20 56.35 0.00 0.00
- Beton AD M3 2.02 0.00 0.00 0.00

IV PEKERJAAN PASANGAN DINDING BATA


1 Pasangan Dinding Bata AD. 1:5 M2 275.84 13.16 0.00 0.00
2 Plesteran Dinding Bata AD. 1:5 + Acian M2 551.7 0.00 0.00 0.00
NILAI TAHAP
BOBOT
NO ITEM PEKERJAAN SAT VOL BOBOT PENYELESAIAN

% MNGGU S.D MGG INI %


1 2 3 4 5 6
V PEKERJAAN KUSEN PINTU DAN JENDELA
1 P1 (uk. 220x150) Kusen Alumunium Daun Rangka Kayu Lapis Tripl UNIT 2 1.17 0.00 0.00
NILAI TAHAP
BOBOT
NO ITEM PEKERJAAN SAT VOL BOBOT PENYELESAIAN

% MNGGU S.D MGG INI %


1 2 3 4 5 6
2 J1 (uk. 220x140) Kusen daun Jendela Alumunium UNIT 14 5.54 0.00 0.00

VI PEKERJAAN MENGECAT 2.21 0.00 0.00


1 Pengecatan tembok ex Vinilex M2 551.7 2.21 0.00 0.00

VII PEKERJAAN LANTAI DAN PLAFON


1 Pemasangan Lantai Keramik 40x40 M2 240 5.90 0.00 0.00
2 Pasang Plafon rangka Hollo lapis Gypsum M2 240 0.72 0.00 0.00
3 Pasang List Gypsum M 112 12.86 0.00 0.00

VIII PEKERJAAN LISTRIK


1 Pemasangan titik saklar ex brocco BH 6 0.68 0.00 0.00
3 Pemasangan titik stop kontak ex brocco BH 18 0.75 0.00 0.00
4 Pemasangan lampu downlight (lengkap accessories) BH 18 1.65 0.00 0.00

IX PEKERJAAN LAIN
1 Beton tumbuk untuk tritisan M3 2.0 0.68 0.00 0.00

2 Pasangan Bata Merah untuk Drainase M2 34.0 0.34 0.00 0.00

3 Pembersihan Lokasi Pekerjaan LS 1 1.37 0.00 0.00

Kepala SMKN 1 Lemahabang Ketua Tim Perencana & Pengawas

H. WIRYO SANTOSO, M. M.Pd ESAK KHAIDIR, ST


NIP. 19591218 1984 03 1 008
KTEK SISWA

PRESTASI
TERHADAP
KESELURUHAN
%
7
PRESTASI
TERHADAP
KESELURUHAN
%
7
PRESTASI
TERHADAP
KESELURUHAN
%
7

erencana & Pengawas

K KHAIDIR, ST
LAMPIRAN BERITA ACARA PEMERIKSAAN KEMAJUAN PEKERJAAN PEMBANGUNAN RUANG PRAKTEK SISWA
SMK NEGERI 1 LEMAHABANG

LAPORAN KEMAJUAN PEKERJAAN


WAKTU PELAKSANAAN PEKERJAAN : 120 HARI KALENDER
MINGGU KE : 4 ( DARI TGL 17 JULI 2017 S.D. TGL. 23 JULI 2017 )

NILAI TAHAP
BOBOT
NO ITEM PEKERJAAN SAT VOL BOBOT PENYELESAIAN

% MNGGU S.D MGG INI %


1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pengukuran dan Bouplank LS 1 0.21 0.00 0.21
2 Papan Nama Proyek LS 1 0.10 0.00 0.10
3 Pembuatan steiger dari bambu LS 1 0.27 0.00 0.27

II PEKERJAAN GALIAN DAN PONDASI


1 Galian Tanah M3 48.95 0.28 0.00 0.28
2 Urugan Tanah M2 45.50 1.12 0.00 1.12
3 Pondasi Foot Plat
- Pembesian Kg 675 1.80 0.00 0.00
- Bekisting M2 36.0 0.68 0.00 0.00
- Beton AD. 1:2:3 M3 6.75 1.16 0.00 0.00
4 Pasangan Pondasi Rolak M2 61.2 1.23 0.00 0.00

III PEKERJAAN BETON/PEMBESIAN


1 SLOOF 25/35
- Pembesian Kg 893 2.38 0.00 0.00
- Bekisting M2 71.4 1.24 0.00 0.00
- Beton AD. 1:2:3 M3 8.93 1.53 0.00 0.00
2 KOLOM 30/30
- Pembesian Kg 1,080.0 9.52 0.00 0.00
- Bekisting M2 144.0 1.41 0.00 0.00
- Beton AD. 1:2:3 M3 11 1.02 0.00 0.00
3 BALOK 25/30
- Pembesian Kg 765.0 1.15 0.00 0.00
- Bekisting M2 87 2.49 0.00 0.00
- Beton AD. 1:2:3 M3 7.65 0.03 0.00 0.00
4 BALOK PENGUAT KUSEN
- Pembesian Kg 118.58 13.53 0.00 0.00
- Bekisting M2 26.64 0.00 0.00 0.00
- Beton AD. 1:2:3 M3 1.188 0.43 0.00 0.00
5 ATAP BETON K250
- Wiremesh dia 8mm - 150 M2 240.00 0.20 0.00 0.00
- Bondek 0.75 M2 240.00 0.00 0.00 0.00
- Beton K225 M3 28.800 2.47 0.00 0.00
6 CANOPY BETON
- Pembesian KG 201.28 8.18 0.00 0.00
- Bekisting M2 43.20 56.35 0.00 0.00
- Beton AD M3 2.02 0.00 0.00 0.00

IV PEKERJAAN PASANGAN DINDING BATA


1 Pasangan Dinding Bata AD. 1:5 M2 275.84 13.16 0.00 0.00
2 Plesteran Dinding Bata AD. 1:5 + Acian M2 551.7 0.00 0.00 0.00
NILAI TAHAP
BOBOT
NO ITEM PEKERJAAN SAT VOL BOBOT PENYELESAIAN

% MNGGU S.D MGG INI %


1 2 3 4 5 6
V PEKERJAAN KUSEN PINTU DAN JENDELA
1 P1 (uk. 220x150) Kusen Alumunium Daun Rangka Kayu Lapis Tripl UNIT 2 1.17 0.00 0.00
NILAI TAHAP
BOBOT
NO ITEM PEKERJAAN SAT VOL BOBOT PENYELESAIAN

% MNGGU S.D MGG INI %


1 2 3 4 5 6
2 J1 (uk. 220x140) Kusen daun Jendela Alumunium UNIT 14 5.54 0.00 0.00

VI PEKERJAAN MENGECAT 2.21 0.00 0.00


1 Pengecatan tembok ex Vinilex M2 551.7 2.21 0.00 0.00

VII PEKERJAAN LANTAI DAN PLAFON


1 Pemasangan Lantai Keramik 40x40 M2 240 5.90 0.00 0.00
2 Pasang Plafon rangka Hollo lapis Gypsum M2 240 0.72 0.00 0.00
3 Pasang List Gypsum M 112 12.86 0.00 0.00

VIII PEKERJAAN LISTRIK


1 Pemasangan titik saklar ex brocco BH 6 0.68 0.00 0.00
3 Pemasangan titik stop kontak ex brocco BH 18 0.75 0.00 0.00
4 Pemasangan lampu downlight (lengkap accessories) BH 18 1.65 0.00 0.00

IX PEKERJAAN LAIN
1 Beton tumbuk untuk tritisan M3 2.0 0.68 0.00 0.00

2 Pasangan Bata Merah untuk Drainase M2 34.0 0.34 0.00 0.00

3 Pembersihan Lokasi Pekerjaan LS 1 1.37 0.00 0.00

Kepala SMKN 1 Lemahabang Ketua Tim Perencana & Pengawas

H. WIRYO SANTOSO, M. M.Pd ESAK KHAIDIR, ST


NIP. 19591218 1984 03 1 008
KTEK SISWA

PRESTASI
TERHADAP
KESELURUHAN
%
7
PRESTASI
TERHADAP
KESELURUHAN
%
7
PRESTASI
TERHADAP
KESELURUHAN
%
7

erencana & Pengawas

K KHAIDIR, ST
1.388889