REKAP PRODUKSI

ADI SANTOSO STONE CRUSHER

Jenis Matrial M³
No Hari/ Tanggal Jumlah M ³ KET
Bt, 2/3 Bt, 2/1 Bt, 1/1 Abu Batu
1 Senin, 15/6/2020 - - - - - PERBAIKAN
2 Selasa, 16/6/2020 - - - - - PERBAIKAN
3 Rabu, 17/6/2020 7 4 3 2 16
4 Kamis,18/6/2020 7 4 5 2 16
5 Jumat, 19/6/2020 19 8 7 5 39
6 Sabtu, 20/6/2020 19 8 7 5 39
7 Minggu,21/6/2020 15 6 5 3 29
8 Senin, 22/6/2020 19 8 7 5 39
9 Selasa, 23/6/2020 15 6 5 3 29
10 Rabu, 24/6/2020 19 8 7 5 39
11 Kamis, 25/6/2020 19 8 7 5 39
12 Jumat, 26/6/2020 15 6 5 3 29
13 Sabtu, 27/6/2020 18 7 6 5 36
14 Senin,29/6/2020 - - - - - PERBAIKAN
15 Selasa, 30/6/2020 13 7 6 5 31
TOTAL 185 80 68 48 381

PRODUKSI DARI BAWAH

Jenis Material M³
No Hari/Tanggal Jumlah M³ KET
BATU SIRTU PASIR
1 Senin, 15/6/2020
2 Selasa, 16/6/2020
3 Rabu, 17/6/2020 198 82 280
4 Kamis,18/6/2020 283 33 316
5 Jumat, 19/6/2020 294 5 299
6 Sabtu, 20/6/2020 35 35
7 Minggu,21/6/2020
8 Senin, 22/6/2020
9 Selasa, 23/6/2020
10 Rabu, 24/6/2020
11 Kamis, 25/6/2020
12 Jumat, 26/6/2020
13 Sabtu, 27/6/2020
14 Senin,29/6/2020
15 Selasa, 30/6/2020
TOTAL 810 120 0 930

Hormat Kami
Manager

LUKMAN NUL HAKIM


REKAP PRODUKSI
ADI SANTOSO STONE CRUSHER

No Jenis Matrial M³
Hari/ Tanggal Jumlah M ³ KET
Bt, 2/3 Bt, 2/1 Bt, 1/1 Abu Batu
1 Rabu,1/7/2020 15 6 5 3 29
2 Kamis,2/7/2020 15 6 5 3 29
3 jumat,3/7/2020 15 6 5 3 29
4 sabtu,4/7/2020 15 6 5 3 29
5 senin,6/7/2020 12 6 5 4 27
6 selasa,7/7/2020 19 8 7 5 39
7 Rabu,8/7/2020 18 7 6 5 36
8 Kamis,9/7/2020 - - - - - DANDAN
9 jumat,10/7/2020 15 6 5 3 29
10 sabtu,11/7/2020 - - - - - DANDAN
11 senin,13/7/2020 - - - - - DANDAN
12 selasa,14/7/2020 19 8 7 5 39
13 Rabu, 15/7/2020 18 7 6 5 36
14 Kamis,16/7/2020 15 6 5 3 29
15 Jumat,17/7/2020 - - - - - DANDAN
16 Sabtu, 18/7/2020 - - - - - DANDAN
17 Senin, 20/7/2020
18 selasa,21/7/2020
19 rabu,22/7/2020
20 kamis,23/7/2020
21 jumat,24/7/2020 19 8 7 5 39
22 sabtu,25/7/2020 7 5 4 3 19
23 senin,27/7/2020 15 6 5 3 29
24 selasa,28/7/2020
25 Rabu, 29/7/2020
26 Kamis,30//7//2020
TOTAL 217 91 77 53 438
PRODUKSI DARI BAWAH

Jenis Material M³
No Hari/Tanggal Jumlah M³ KET
BATU SIRTU PASIR
1 Rabu,1/7/2020 262 262
2 Kamis,2/7/2020 150 150
3 jumat,3/7/2020
4 sabtu,4/7/2020 75 75
5 senin,6/7/2020
6 selasa,7/7/2020 265 265
7 Rabu,8/7/2020 75 75
8 Kamis,9/7/2020 205 205
9 jumat,10/7/2020 345 10 355
10 sabtu,11/7/2020
11 senin,13/7/2020
12 selasa,14/7/2020 330 330
13 Rabu, 15/7/2020 275 275
14 Kamis,16/7/2020 155 155
15 Jumat,17/7/2020
16 Sabtu, 18/7/2020
17 Senin, 20/7/2020
18 selasa,21/7/2020
19 rabu,22/7/2020
20 kamis,23/7/2020
21 jumat,24/7/2020 0
22 sabtu,25/7/2020 385 385
23 senin,27/7/2020 0
24 selasa,28/7/2020 0
25 Rabu, 29/7/2020 270 270
26 Kamis,30//7//2020 235 235
3027 10 0 3037
REKAP PRODUKSI
ADI SANTOSO STONE CRUSHER

Jenis Matrial M³
No Hari/ Tanggal Jumlah M ³ KET
Bt, 2/3 Bt, 2/1 Bt, 1/1 Abu Batu
1 sabtu,1/8/2020 LIBUR
2 minggu,2/8/2020 LIBUR
3 senin,3/8/2020 DANDAN
4 selasa,4/8/2020 DANDAN
5 rabu,5/8/2020 DANDAN
6 Kamis,6/8/2020 15 6 5 3 29
7 Jumat,7/8/2020 18 7 6 5 36
8 Sabtu,8/8/2020 19 8 7 5 39
9 minggu,9/8/2020 LIBUR
10 senin,10/8/2020 19 8 7 5 39
11 selasa,11/8/2020 5 4 3 1 13
12 rabu,12/8/2020 15 7 6 5 33
13 kamis,13/8/2020 19 8 7 5 39
14 jumat,14/8/2020 19 8 7 5 39
15 sabtu,15/8/2020 19 8 7 5 39
16 minggu,16/8/2020 LIBUR
17 senin,17/8/2020 LIBUR
18 selasa,18/8/2020 18 7 6 5 36
19 rabu,19/8/2020 19 8 7 5 39
20 kamis,20/8/2020 19 8 7 5 39
21 jumat,21/8/2020 19 8 7 5 39
22 sabtu,22/8/2020 18 7 6 5 36
23 minggu,23/8/2020
24 senin,24/8/2020 19 8 7 5 39
25 selasa,25/8/2020 15 7 6 4 32
26 Rabu,26/8/2020 18 7 6 5 36
27 kamis,27/8/2020 19 8 7 5 39
28 Jumat28/8/2020 19 8 7 5 39
29 Sabtu,29/8/2020
30 Minggu30/8/2020 19 8 7 5 39
31 senin,31/8/2020 14 7 6 4 31
TOTAL 364 155 134 97 750
PRODUKSI DARI BAWAH

Jenis Material M³
No Hari/Tanggal Jumlah M³ KET
BATU SIRTU PASIR
1 sabtu,1/8/2020 LIBUR
2 minggu,2/8/2020 LIBUR
3 senin,3/8/2020 50
4 selasa,4/8/2020 420
5 rabu,5/8/2020 315
6 Kamis,6/8/2020 100
7 Jumat,7/8/2020 230
8 Sabtu,8/8/2020 350
9 minggu,9/8/2020 LIBUR
10 senin,10/8/2020
11 selasa,11/8/2020
12 rabu,12/8/2020 55
13 kamis,13/8/2020
14 jumat,14/8/2020 210
15 sabtu,15/8/2020 205
16 minggu,16/8/2020 LIBUR
17 senin,17/8/2020 LIBUR
18 selasa,18/8/2020 180
19 rabu,19/8/2020 225
20 kamis,20/8/2020 405
21 jumat,21/8/2020
22 sabtu,22/8/2020
23 minggu,23/8/2020
24 senin,24/8/2020 100
25 selasa,25/8/2020 180
26 Rabu,26/8/2020
27 kamis,27/8/2020 215
28 Jumat28/8/2020 175
29 Sabtu,29/8/2020
30 Minggu30/8/2020
31 senin,31/8/2020
TOTAL 3415
REKAP PRODUKSI
ADI SANTOSO STONE CRUSHER

No Hari/ Tanggal Jenis Matrial M³ Jumlah M ³ KET


Bt, 2/3 Bt, 2/1 Bt, 1/1 Abu Batu
1 1/9/2020
2 2/9/2020
3 3/9/2020
4 4/9/2020
5 5/9/2020
6 6/9/2020
7 7/9/2020
8 8/9/2020
9 9/0/2020
10 10/9/2020 14 7 6 4 31
11 11/9/2020 14 7 6 4 31
12 12/9/2020 12 6 5 3 26
13 13/9/2020
14 14/9/2020 14 7 6 4 31
15 15/9/2020 4 3 2 1 10
16 16/9/2020 4 3 2 1 10
17 17/9/2020
18 18/9/2020
19 19/9/2020
20 20/ 9/2020
21 21/9/2020
22 22/9/2020
23 23/9/2020
24 24/9/2020
25 25/9/2020 14 7 6 4 31
26 26/9/2020 14 7 6 4 31
27 27/9/2020
28 28/9/2020 14 7 6 4 31
29 29/9/2020 14 7 6 4 31
30 30/9/2020 14 7 6 4 31
31 31/9/2020
TOTAL 132 68 57 37 294
PRODUKSI DARI BAWAH

Jenis Material M³
No Hari/Tanggal Jumlah M³ KET
BATU SIRTU PASIR
1 1/9/2020
2 2/9/2020 120
3 3/9/2020 150
4 4/9/2020
5 5/9/2020 170
6 6/9/2020
7 7/9/2020 315
8 8/9/2020
9 9/0/2020
10 10/9/2020 175
11 11/9/2020 270
12 12/9/2020
13 13/9/2020
14 14/9/2020
15 15/9/2020
16 16/9/2020 280
17 17/9/2020
18 18/9/2020 330
19 19/9/2020 150
20 20/ 9/2020
21 21/9/2020
22 22/9/2020
23 23/9/2020
24 24/9/2020
25 25/9/2020
26 26/9/2020
27 27/9/2020
28 28/9/2020
29 29/9/2020
30 30/9/2020
31 31/9/2020
TOTAL 1960
REKAP PRODUKSI
ADI SANTOSO STONE CRUSHER

No Hari/ Tanggal Jenis Matrial M³ Jumlah M ³ KET


Bt, 2/3 Bt, 2/1 Bt, 1/1 Abu Batu
1 1/10/2020 12 6 5 3 26
2 2/10/2020 12 6 5 3 26
3 3/10/2020 14 7 6 4 31
4 4/10/2020 MINGGU
5 5/10/2020 10 5 4 2 21
6 6/10/2020 DANDAN
7 7/10/2020 14 7 6 4 31
8 8/10/2020 12 6 5 3 26
9 9/10/2020 12 6 5 3 26
10 10/10/2020 14 7 6 4 31
11 11/10/2020 MINGGU
12 12/10/2020 14 7 6 4 31
13 13/10/2020 14 7 6 4 31
14 14/10/2020 14 7 6 4 31
15 15/10/2020 30 25 12 10 77
16 16/10/2020 21 17.5 8.5 7 53.9
17 17/10/2020 21 17.5 8.5 7 53.9
18 18/10/2020 MINGGU
19 19/10/2020 18 15 7,2 6 46.2
20 20/ 10/2020 18 15 7,2 6 46.2
21 21/10/2020 18 15 7,2 6 46.2
22 22/10/2020 18 15 7,2 6 46.2
23 23/10/2020 21 17.5 8.5 7 53.9
24 24/10/2020 18 15 7,2 6 46.2
25 25/10/2020 MINGGU
26 26/10/2020 18 15 7,2 6 46.2
27 27/10/2020 21 17.5 8.5 7 53.9
28 28/10/2020 15 12.5 6 5 41.2
29 29/10/2020 12 10 4.8 4 30.8
30 30/10/2020 DANDAN
31 31/10/2020 DANDAN
TOTAL 391 278.5 116.8 121 907.3
PRODUKSI DARI BAWAH

Jenis Material M³
No Hari/Tanggal Jumlah M³ KET
BATU SIRTU PASIR
1 1/10/2020
2 2/10/2020
3 3/10/2020
4 4/10/2020
5 5/10/2020
6 6/10/2020
7 7/10/2020
8 8/10/2020
9 9/10/2020
10 10/10/2020
11 11/10/2020
12 12/10/2020
13 13/10/2020
14 14/10/2020 230
15 15/10/2020 155
16 16/10/2020 215
17 17/10/2020 325
18 18/10/2020
19 19/10/2020
20 20/ 10/2020
21 21/10/2020
22 22/10/2020
23 23/10/2020
24 24/10/2020
25 25/10/2020
26 26/10/2020
27 27/10/2020 160
28 28/10/2020 155
29 29/10/2020 310
30 30/10/2020
31 31/10/2020
TOTAL 1550 1550
ADI SANTOSO STONE CRUSHER

No Hari/ Tanggal Jenis Matrial M³ Jumlah M ³ KET


Bt, 2/3 Bt, 2/1 Bt, 1/1 Abu Batu
1 1/11/2020 MINGGU
2 2/11/2020 21 17.5 8.5 7 53.9
3 3/11/2020 21 17.5 8.5 7 53.9
4 4/11/2020 21 17.5 8.5 7 53.9
5 5/11/2020 21 17.5 8.5 7 53.9
6 6/11/2020 18 15 7.2 6 46.2
7 7/11/2020 15 12.5 6.2 5 34.2
8 8/11/2020 MINGGU
9 9/11/2020 18 15 7.2 6 46.2
10 10/11/2020 18 15 7.2 6 46.2
11 11/11/2020 21 17.5 8.5 7 53.9
12 12/11/2020 DANDAN
13 13/11/2020 DANDAN
14 14/11/2020 DANDAN
15 15/11/2020 MINGGU
16 16/11/2020 21 17.5 8.5 7 53.9
17 17/11/2020 21 17.5 8.5 7 53.9
18 18/11/2020 15 12.5 6.2 5 34.2
19 19/11/2020 21 17.5 8.5 7 53.9
20 20/ 11/2020 21 17.5 8.5 7 53.9
21 21/11/2020 18 15 7.2 6 46.2
22 22/11/2020 MINGGU
23 23/11/2020 21 17.5 8.5 7 53.9
24 24/11/2020 15 12.5 6.2 5 34.2
25 25/11/2020 21 17.5 8.5 7 53.9
26 26/11/2020 21 17.5 8.5 7 53.9
27 27/11/2020 DANDAN
28 28/11/2020 DANDAN
29 29/11/2020 MINGGU
30 30/11/2020
31 31/11/2020
TOTAL 369 307.5 149.4 123 948.9
PRODUKSI DARI BAWAH

Jenis Material M³
No Hari/Tanggal Jumlah M³ KET
BATU SIRTU PASIR
1 1/11/2020 MINGGU
2 2/11/2020 75
3 3/11/2020
4 4/11/2020 220
5 5/11/2020
6 6/11/2020 305
7 7/11/2020
8 8/11/2020
9 9/11/2020
10 10/11/2020
11 11/11/2020 250
12 12/11/2020
13 13/11/2020
14 14/11/2020 225 140
15 15/11/2020 300
16 16/11/2020 300
17 17/11/2020
18 18/11/2020
19 19/11/2020
20 20/ 11/2020
21 21/11/2020 75
22 22/11/2020
23 23/11/2020
24 24/11/2020
25 25/11/2020 365
26 26/11/2020 70
27 27/11/2020
28 28/11/2020 90
29 29/11/2020
30 30/11/2020
31 31/11/2020
TOTAL 2275 0 140 2415
ADI SANTOSO STONE CRUSHER

No Hari/ Tanggal Jenis Matrial M³ Jumlah M ³ KET


Bt, 2/3 Bt, 2/1 Bt, 1/1 Abu Batu
1 1/12/2020 DANDAN
2 2/12/2020 DANDAN
3 3/12/2020 DANDAN
4 4/12/2020 DANDAN
5 5/12/2020 DANDAN
6 6/12/2020 MINGGU
7 7/12/2020 DANDAN
8 8/12/2020 DANDAN
9 9/12/2020 LIBUR
10 10/12/2020 12 10 4.8 4 30.8
11 11/12/2020 21 17.5 8.4 7 53.9
12 12/12/2020 21 17.5 8.4 7 53.9
13 13/12/2020 MINGGU
14 14/12/2020 18 15 7.2 6 46.2
15 15/12/2020 21 17.5 8.4 7 53.9
16 16/12/2020 21 17.5 8.4 7 53.9
17 17/12/2020 18 15 7.2 6 46.2
18 18/12/2020 18 15 7.2 6 46.2
19 19/12/2020 12 10 4.8 4 30.8
20 20/ 21/2020 21 17.5 8.4 7 53.9
21 21/12/2020 MINGGU
22 22/12/2020 18 15 7.2 6 46.2
23 23/12/2020 15 12.5 6 5 38.5
24 24/12/2020 21 17.5 8.4 7 53.9
25 25/12/2020 21 17.5 8.4 7 53.9
26 26/12/2020 21 17.5 8.4 7 53.9
27 27/12/2020 MINGGU
28 28/12/2020 18 15 7.2 6 46.2
29 29/12/2020 12 10 4.8 4 30.8
30 30/12/2020
31 31/12/2020
TOTAL 309 257.5 123.6 103 793.1
PRODUKSI DARI BAWAH

Jenis Material M³
No Hari/Tanggal Jumlah M³ KET
BATU SIRTU PASIR
1 1/12/2020 MINGGU
2 2/12/2020
3 3/12/2020 500 20 10
4 4/12/2020
5 5/12/2020
6 6/12/2020
7 7/12/2020
8 8/12/2020
9 9/12/2020
10 10/12/2020
11 11/12/2020
12 12/12/2020
13 13/12/2020
14 14/12/2020 175
15 15/12/2020
16 16/12/2020
17 17/12/2020
18 18/12/2020
19 19/12/2020
20 20/ 21/2020
21 21/12/2020
22 22/12/2020
23 23/12/2020
24 24/12/2020
25 25/12/2020
26 26/12/2020
27 27/12/2020
28 28/12/2020
29 29/12/2020
30 30/12/2020
31 31/12/2020
TOTAL 675 20 10 705
ADI SANTOSO STONE CRUSHER

No BULAN Jenis Matrial M³ Jumlah M ³ KET


Bt, 2/3 Bt, 2/1 Bt, 1/1 Abu Batu
1 JANUARI
2 FEBRUARI
3 MARET
4 APRIL
5 MEI
6 JUNI 185 80 68 48 381
7 JULI 217 91 77 53 438
8 AGUSTUS 364 155 134 97 720
9 SEBTEMBER 132 68 57 37 294
10 OKTOBER 391 278.5 116.8 121 907.3
11 NOVEMBER 369 307.5 149.4 123 948.9
12 DESEMBER
TOTAL 1658 980 602.2 479 3719.2

PRODUKSI DARI BAWAH

Jenis Material M³
No BULAN Jumlah M³ KET
BATU SIRTU PASIR
1 JANUARI
2 FEBRUARI
3 MARET
4 APRIL
5 MEI
6 JUNI 810 120 930
7 JULI 3027 10 3037
8 AGUSTUS 3415 3415
9 SEBTEMBER 1960 1550
10 OKTOBER 1550 1550
11 NOVEMBER 2275 140 2415
12 DESEMBER 675 20 10 705
TOTAL 13712 150 150 13602

Anda mungkin juga menyukai

  • Perjanjian Sewa
    Perjanjian Sewa
    Dokumen3 halaman
    Perjanjian Sewa
    Adi santoso Stone Cruser
    Belum ada peringkat
  • Po Karyawan
    Po Karyawan
    Dokumen2 halaman
    Po Karyawan
    Adi santoso Stone Cruser
    Belum ada peringkat
  • Surat Dukungan Matrial
    Surat Dukungan Matrial
    Dokumen1 halaman
    Surat Dukungan Matrial
    Adi santoso Stone Cruser
    Belum ada peringkat
  • PO Surat Pesanan
    PO Surat Pesanan
    Dokumen1 halaman
    PO Surat Pesanan
    Adi santoso Stone Cruser
    Belum ada peringkat
  • PO Surat Pesanan
    PO Surat Pesanan
    Dokumen1 halaman
    PO Surat Pesanan
    Adi santoso Stone Cruser
    Belum ada peringkat
  • Laporan K BKD
    Laporan K BKD
    Dokumen3 halaman
    Laporan K BKD
    Adi santoso Stone Cruser
    Belum ada peringkat
  • Laphar BBM
    Laphar BBM
    Dokumen1 halaman
    Laphar BBM
    Adi santoso Stone Cruser
    Belum ada peringkat
  • PO Januari 2019
    PO Januari 2019
    Dokumen1 halaman
    PO Januari 2019
    Adi santoso Stone Cruser
    Belum ada peringkat
  • Po Konveyor Belt
    Po Konveyor Belt
    Dokumen1 halaman
    Po Konveyor Belt
    Adi santoso Stone Cruser
    Belum ada peringkat
  • Penggunaan Alat
    Penggunaan Alat
    Dokumen2 halaman
    Penggunaan Alat
    Adi santoso Stone Cruser
    Belum ada peringkat
  • Surat Rafki
    Surat Rafki
    Dokumen1 halaman
    Surat Rafki
    Adi santoso Stone Cruser
    Belum ada peringkat
  • Laporan K BKD
    Laporan K BKD
    Dokumen2 halaman
    Laporan K BKD
    Adi santoso Stone Cruser
    Belum ada peringkat
  • LAPHAR Hasil Produksi
    LAPHAR Hasil Produksi
    Dokumen5 halaman
    LAPHAR Hasil Produksi
    Adi santoso Stone Cruser
    Belum ada peringkat
  • Laporan Harian
    Laporan Harian
    Dokumen1 halaman
    Laporan Harian
    Adi santoso Stone Cruser
    Belum ada peringkat
  • Soal Tematik Kelas 5 Tema 4 Subtema 1 - Kamimadrasah
    Soal Tematik Kelas 5 Tema 4 Subtema 1 - Kamimadrasah
    Dokumen3 halaman
    Soal Tematik Kelas 5 Tema 4 Subtema 1 - Kamimadrasah
    Adi santoso Stone Cruser
    100% (1)
  • Invois Itiw
    Invois Itiw
    Dokumen1 halaman
    Invois Itiw
    Adi santoso Stone Cruser
    Belum ada peringkat
  • Invois DAN RAMIL
    Invois DAN RAMIL
    Dokumen1 halaman
    Invois DAN RAMIL
    Adi santoso Stone Cruser
    Belum ada peringkat
  • Invois DAN RAMIL
    Invois DAN RAMIL
    Dokumen1 halaman
    Invois DAN RAMIL
    Adi santoso Stone Cruser
    Belum ada peringkat