EXISTING LAYOUT
EXISTING LAYOUT Praijitno S.
2/27/2020
Edited Checked Released

PT.Siemens Indonesia
Project and Planning department
Arkadia office park tower F/18
Jl.TB.Simatupang Kav 88 Jakarta 12520

RSUD dr Soemarno
Jl. Tambun Bungai No.16, Selat Tengah, Kec. Selat
Kabupaten Kapuas, Kalimantan Tengah

COMPUTED TOMOGRAPHY
SOMATOM go.All
Project File Revision Page Size Scale
77555 1208380 01 of 03 A1
Remarks
1.01 Gantry
1.02 Patient Table
1.03 Control Unit
1.04 Wireless Access Point
1.05 Electricity Panel

Electrical Installation : 3 Phase


Power Consumption : 115 kVA
Grounding : 0.2Ω

Temperature : 20°C - 22°C


Recommended 22°C

Humidity : 50% - 60%

Weight
1.04 Gantry : 1306 kg
1.05
1.03 WC Patient Table : 338 kg
1.01
PRIA

R. RESEPSIONIS
R. OPERATOR 1.02
Local and Internet Network Connection
WC
Jaringan Lokal :
WANITA
- LAN Port yang terkoneksi dengan Jaringan Rumah
Sakit.
R. PEMERIKSAAN - Jumlah LAN Port disesuaikan dengan peralatan
(Komputer System, Printer, Router, dll)
- Jika komputer/printer diletakkan di ruangan
R. UPS berbeda, mohon dapat disiapkan jaringannya.

Internet :
R. TUNGGU - Rumah Sakit menyediakan Internet yang akan
digunakan oleh Siemens untuk proses Smart
R. GENSET DAN Remote Services.
PANEL LISTRIK - Beberapa Port yang perlu dibuka pada firewall akan
diinformasikan kemudian.
- Internet ini dapat diakses pada ruang operator
x-ray.
- Bandwidth minimum 2 Mbps.

Customer Acknowledgement

........................................................ ........................................................... ..................................


Name Signature Date

Title

PROPOSED LAYOUT - 1
PROPOSED LAYOUT - 1 Praijitno S.
2/27/2020
Edited Checked Released

PT.Siemens Indonesia
Project and Planning department
Arkadia office park tower F/18
Jl.TB.Simatupang Kav 88 Jakarta 12520

RSUD dr Soemarno
Jl. Tambun Bungai No.16, Selat Tengah, Kec. Selat
Kabupaten Kapuas, Kalimantan Tengah

COMPUTED TOMOGRAPHY
SOMATOM go.All
Project File Revision Page Size Scale
77555 1208380 02 of 03 A1
Remarks
1.01 Gantry
1.02 Patient Table
1.03 Control Unit
1.04 Wireless Access Point
1.05 Electricity Panel

Electrical Installation : 3 Phase


Power Consumption : 115 kVA
Grounding : 0.2Ω

Temperature : 20°C - 22°C


Recommended 22°C

Humidity : 50% - 60%

Weight
Gantry : 1306 kg
1.05
WC Patient Table : 338 kg
1.04
PRIA

R. RESEPSIONIS
1.03 1.02
1.01 Local and Internet Network Connection
WC
Jaringan Lokal :
WANITA
- LAN Port yang terkoneksi dengan Jaringan Rumah
Sakit.
R. PEMERIKSAAN - Jumlah LAN Port disesuaikan dengan peralatan
R. OPERATOR (Komputer System, Printer, Router, dll)
- Jika komputer/printer diletakkan di ruangan
R. UPS berbeda, mohon dapat disiapkan jaringannya.

Internet :
R. TUNGGU - Rumah Sakit menyediakan Internet yang akan
digunakan oleh Siemens untuk proses Smart
R. GENSET DAN Remote Services.
PANEL LISTRIK - Beberapa Port yang perlu dibuka pada firewall akan
diinformasikan kemudian.
- Internet ini dapat diakses pada ruang operator
x-ray.
- Bandwidth minimum 2 Mbps.

Customer Acknowledgement

........................................................ ........................................................... ..................................


Name Signature Date

Title

PROPOSED LAYOUT - 2
PROPOSED LAYOUT - 2 Praijitno S.
2/27/2020
Edited Checked Released

PT.Siemens Indonesia
Project and Planning department
Arkadia office park tower F/18
Jl.TB.Simatupang Kav 88 Jakarta 12520

RSUD dr Soemarno
Jl. Tambun Bungai No.16, Selat Tengah, Kec. Selat
Kabupaten Kapuas, Kalimantan Tengah

COMPUTED TOMOGRAPHY
SOMATOM go.All
Project File Revision Page Size Scale
77555 1208380 03 of 03 A1