1.0 GENERAL
Compressors are normally located inside a permanent shelter or building (Compressor House) for
weather protection. The compressor house can be fully covered by side cladding to grade level if
handling non-hazardous materials e.g. air.
1.1 For compressor, handling flammable materials, ventilation and weather protection is assured by
significant openings upto 2.5m ht. at grade level together with roof ventilators.
1.2 Except for lighter than air gases, trenches, pits and similar gas traps should be avoided within gas
Compressor House. This will eliminate chances of suffocation or explosion risk due to
accumulation of heavy gases in pits.
1.3 For open compressor house, the side cladding on all sides should be provided upto 1m below
crane level.
1.4 The general arrangement of compressor house shall consider the vendor drawings and vendor
recommendation, if any, for space and location of auxiliary units.
1.5 For compressor house where a number of installations from multiple vendors are to be
accomodated, a thorough discussion should be held among the engineers of Piping, Process and
Civil discipline to finalise the detail plot plan of the unit.
1.6 The clear space between compressors shall be minimum 1.5m or half width of the compressors.
The clearance between rows of compressor and at the end of each compressor shall be also
1.5m.
1.7 Built-in maintenance equipment viz. travelling gantry with overhead crane / monorail with hoist and
chain-pulley blocks as well as the drop-out areas shall be provided in the compressor house.
1.8 The clearance above the compressor should be at least 3m more than the longest internal part to
be removed.
1.9 The substantial space required for lube oil and seal oil consoles shall be taken into consideration
to prepare unit plot plan.
Rev. : R0
PIPING STUDY
Uhde India Limited COMPRESSOR HOUSE PIPING Page : 4
Rev. : R0
PIPING STUDY
Uhde India Limited COMPRESSOR HOUSE PIPING Page : 5
Rev. : R0
PIPING STUDY
Uhde India Limited COMPRESSOR HOUSE PIPING Page : 6
- Utilities requirement
- Control panel
- Vendor's specific requirements
- Thermal load on nozzles / flexibility analysis
- Independent supports
- Straight length requirement at suction
- Relief valves on discharge
- Orientation of compressor w.r.t. overall and unit Plot Plan and other facilities viz.piperack,
underground facilities, drainage, road access etc.
- Layout concept from the vendor offer stage.
TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1008
Rev. : RO
PIPING STUDY
Uhde India Limited COMPRESSOR HOUSE PIPING Page : 1 OF 1
DWG. NO. : CHP1
SUCTION HEADER
SUCTION HEADER
C K.O.DRUM
L
2ND STAGE
CL COMPRESSOR
DRIVER
1ST STAGE
PULSATION
DAMPENERS
1/2 WIDTH OF
COMPRESSOR OR
MIN. 1500MM
(2ND STAGE)
(2ND STAGE)
(1ST STAGE)
C COMPRESSOR
L
DRIVER
1ST STAGE
CYLINDER
SUPPORT
ACCESS
TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1008
Rev. : RO
PIPING STUDY
Uhde India Limited COMPRESSOR HOUSE PIPING Page : 1 OF 1
DWG. NO. : CHP2
VENT TO ATMOSPHERE
AT SAFE LOCATION
GUIDE
RUNWAY BEAM
HOIST K.O.DRUM
ADEQUATE
CLEARANCE
MIN. 3M
MIN. 1.5M C SUCTION (ALTERNATE)
L
DAMPENER
2400 MIN.
C DRIVER INDEPENDENT
L SUPPORT
PREFERED
GRADE
Rev. : RO
PIPING STUDY
Uhde India Limited COMPRESSOR HOUSE PIPING Page : 1 OF 1
DWG. NO. : CHP3
COMPRESSOR/TURBINE
PI
COMPRESSOR TURBINE
BEARING
(TYP.)
TI
(TYP.)
SLOPING
(FREE DRAINING)
STAINLESS
STEEL LINE
TI
FILTER
TI
LUBE OIL
COOLER
LUBE OIL
RESERVOIR
AUXILIARY
COOLING PUMP
WATER
MAIN
PUMP
HEATING MEDIUM
TO COIL
(IF REQUIRED)
TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1008
Rev. : RO
PIPING STUDY
Uhde India Limited COMPRESSOR HOUSE PIPING Page : 1 OF 1
DWG. NO. : CHP4
SEAL OIL
TANK
COMPRESSOR
VENDOR
CONTRACTOR
CONTINUOUS COOLER
DRAINERS
FILTER
OIL
RESERVOIR
PUMPS
SEAL OIL CONSOLE VENDOR
CONTRACTOR
TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1008
Rev. : R0
PIPING STUDY
Uhde India Limited COMPRESSOR HOUSE PIPING Page : 1 OF 1
DWG. NO. : CHP5
GAS OUTLET
DEMISTER SCREEN
BAFFLE
MANTENACE ACCESS
LIQUID OUTLET
GRADE
TRAINING MANUAL - PIPING DOC NO. : 29040-PI-UPS-1008
Rev. : R0
PIPING STUDY
Uhde India Limited COMPRESSOR HOUSE PIPING Page : 1 OF 1
DWG. NO. : CHP6
ALTERNATE
NOZZLE LOCATIONS
TEMPORARY START-UP
STRAINER
CL SNUBBER
CL COMPRESSOR
VOLUME BOTTLE
PULSATION DAMPNER
ADJUSTABLE SUPPORT