Anda di halaman 1dari 11

KEGIATAN

PETA GOOGLE EARTH


LOKASI JALAN IMAM BONJOL GROUP I PENUNJANG PENGEMBANGAN
KETENAGALISTRIKAN (SHARING OTSUS)

PEKERJAAN

PERENCANAAN DED SHARING OTSUS


TAHUN 2017 PEMASANGAN LAMPU
JALAN DAN INSTALASI RUMAH MISKIN
. 588
Met
er
.
SUMBER DANA :
SHARING OTSUS 2016

LOKASI :

- JALAN IMAM BONJOL

KONSULTAN PELAKSANA
. 588
Met CV. DIAMETER DESIGN CONSULTANT
er
.

Renc. Bok
Panel kWh I
ASRIZAL, ST
DIREKTUR

MENGETAHUI

PEJABAT PEMBUAT KOMITMEN (PPK)


BIDANG MIGAS LISTRIK
DAN PEMANFAATAN ENERGI

ENDI ALFIAN, ST
Nip. 19720702 200112 1 002

MENYETUJUI

KEPALA DINAS
DINAS PERTAMBANGAN DAN ENERGI
KABUPATEN ACEH BARAT

Ir. SYAHRIL
Nip. 19630327 199003 1 002

JUDUL GAMBAR SKALA

Peta Google Earth Tanpa Skala

PEMERINTAH KABUPATEN ACEH BARAT


KEGIATAN
PETA GOOGLE EARTH
LOKASI JALAN IMAM BONJOL (GROP II)
PENUNJANG PENGEMBANGAN
KETENAGALISTRIKAN (SHARING OTSUS)

PEKERJAAN
. 53
6 Me
ter . PERENCANAAN DED SHARING OTSUS
TAHUN 2017 PEMASANGAN LAMPU
JALAN DAN INSTALASI RUMAH MISKIN

SUMBER DANA :
SHARING OTSUS 2016

LOKASI :

- JALAN IMAM BONJOL

. 5
Renc. Bok 58 M
eter
Panel kWh II . KONSULTAN PELAKSANA

CV. DIAMETER DESIGN CONSULTANT

ASRIZAL, ST
DIREKTUR

MENGETAHUI

PEJABAT PEMBUAT KOMITMEN (PPK)


BIDANG MIGAS LISTRIK
DAN PEMANFAATAN ENERGI

ENDI ALFIAN, ST
Nip. 19720702 200112 1 002

MENYETUJUI

KEPALA DINAS
DINAS PERTAMBANGAN DAN ENERGI
KABUPATEN ACEH BARAT

Ir. SYAHRIL
Nip. 19630327 199003 1 002

JUDUL GAMBAR SKALA

Peta Google Earth Tanpa Skala

PEMERINTAH KABUPATEN ACEH BARAT


PROGRAM

NYY 2 PENUNJANG PENGEMBANGAN


x1 0 mm =
Ke S.Tim 362 m KETENAGALISTRIKAN (SHARING OTSUS)
ah
. 42 m
.
. 40 m
.
. 39 m .
. 40 m
. KEGIATAN
. 40 m
.
. 40 m .
. 40 m PERENCANAAN DED SHARING OTSUS
IB .
. 41 m NYY 2 TAHUN 2017 PEMASANGAN LAMPU
18 . x10 m
. 40 m m = 330 JALAN DAN INSTALASI RUMAH MISKIN
Jl . I m
. m
am B . 41 m
.
onjo
IB
l . 42 m
.
13 . 40 m . SUMBER DANA :
. 40
EL I
m.
SHARING OTSUS 2016
PAN
IB
. 42 m
36 .
IB . 42 m
.
9 . 40 m
. LOKASI :
. 40 . 42 m
m. .

. 40
- JALAN IMAM BONJOL
m.

. 40 IB
m.
4
.4 Ke MBO
0m MENYETUJUI
Ke S.Timah .

.4
0m IB PENGGUNA ANGGARAN (PA)
.
1
DINAS PERTAMBANGAN DAN ENERGI
.4 IB
KABUPATEN ACEH BARAT
2m
. 30

. 40
m.

Jl. Ir. SYAHRIL


Im .4
am 0m Nip. 19630327 199003 1 002
Bo .
njo NY
l PANEL II Y2
.4 x10
0m mm MENGETAHUI
. = 326
NY m PEJABAT PEMBUAT KOMITMEN (PPK)
Y2 .4 IB
x10
0m
. 26 BIDANG MIGAS LISTRIK
mm DAN PEMANFAATAN ENERGI
= 362 .4
m 0m
.

.4
2m
. ENDI ALFIAN, ST
Nip. 19720702 200112 1 002
. 40 IB
m.
23
KONSULTAN PELAKSANA
.4
2m
. CV. DIAMETER DESIGN CONSULTANT
.4
0m
.

. 42
m.
ASRIZAL, ST
. 40
m.
IB DIREKTUR
19
JUDUL GAMBAR SKALA

Sket Lokasi Tanpa Skala

PEMERINTAH KABUPATEN ACEH BARAT


Ke MBO
Armatur Lampu
SPESIFIKASI TIANG, ORNAMENT DAN LAMPU JALAN IMAM BONJO

60 cm
Arm

30
Pipe ø 2.5”
PROGRAM
A
. 280 cm .

40 cm
45 cm

Arm LAMPU SON –T 150 WATT . 100 cm . PENUNJANG PENGEMBANGAN


KETENAGALISTRIKAN (SHARING OTSUS)
Pipe ø 2” 50 cm

50 cm
Arm KEGIATAN

. 210 cm .
50 cm 40
Pipe ø 2.5”

. 210 cm .
PERENCANAAN DED SHARING OTSUS
160 cm
175 cm

TAHUN 2017 PEMASANGAN LAMPU


75 cm . 200 cm . JALAN DAN INSTALASI RUMAH MISKIN
. 400 cm .

SUMBER DANA :
45 cm
SHARING OTSUS 2016
80 cm

130 cm
LOKASI :

- JALAN IMAM BONJOL


130 cm

Pipa Stainles
Runcing 8 cm 8 cm

25 cm MENYETUJUI

12 cm

12 cm
10

10
35 cm KEPALA
DINAS PERTAMBANGAN DAN ENERGI
.6 .6 KABUPATEN ACEH BARAT
Garden Lamp Pipa Stainles Steel Fiber Glas Lamp Fiting dan Bola DETAIL A1 DETAIL A2
Top Pole Dia 1,5" dia 30" Lampu warna HE 24
Watt
. 900 cm .

DETAIL GAGANG ORNAMENT


Ir. SYAHRIL
DETAIL ORNAMENT TOP POLE Nip. 19630327 199003 1 002

MENGETAHUI

PEJABAT PEMBUAT KOMITMEN (PPK)


BIDANG MIGAS LISTRIK
DETAIL MODEL LAMPU JALAN DAN PEMANFAATAN ENERGI
350 mm

ʢ Pole
ENDI ALFIAN, ST
. 50 cm .

Mur Baut 19"


Nip. 19720702 200112 1 002

KONSULTAN PELAKSANA
50

H2
20

900 mm
CV. DIAMETER DESIGN CONSULTANT
H1
50

. 50 cm .
30

SLIP JOINT
SIDE VIEW
. 230 cm .

ASRIZAL, ST
DIREKTUR
JUDUL GAMBAR SKALA
. 150 cm .

TAMPAK TAMPAK Detail Tiang dan Tanpa Skala


TAMPAK DEPAN Ornament
60

SAMPING BELAKANG

DETAIL SLIP JOINT


PEMERINTAH KABUPATEN ACEH BARAT
30

FRONT VIEW
60 cm
Arm PROGRAM

30
Pipe ø 2.5”
A
PENUNJANG PENGEMBANGAN

40 cm

45 cm
KETENAGALISTRIKAN (SHARING OTSUS)
Arm
Pipe ø 2”
KEGIATAN
Arm

. 210 cm .
Pipe ø 2.5” PERENCANAAN DED SHARING OTSUS
150 TAHUN 2017 PEMASANGAN LAMPU
110 Hole

160 cm

175 cm
MCB Support JALAN DAN INSTALASI RUMAH MISKIN
3x110x150 100 x 250

300
250

SUMBER DANA :
150
100

SHARING OTSUS 2016


Hole ø 8 mm
Bolt ø 8 mm
(TAPPNG)

ʢ Pole LOKASI :

- JALAN IMAM BONJOL

DETAIL HAND HOLE

50
MENYETUJUI

KEPALA
DINAS PERTAMBANGAN DAN ENERGI
KABUPATEN ACEH BARAT

. 50 .
SLIP JOINT
SIDE VIEW
Slip Joint

Tiang Sangga ø 3.5" Ir. SYAHRIL


ʢ POLE Nip. 19630327 199003 1 002

. 50 cm .
Pole
Rip Plate MENGETAHUI
Anchorot Bolt ø 22
Base Plate t = 16 mm
50 PEJABAT PEMBUAT KOMITMEN (PPK)
BIDANG MIGAS LISTRIK

H1
DAN PEMANFAATAN ENERGI
5 40 5 Plate t = 8 mm

50
25

BASE PLATE 10 ENDI ALFIAN, ST


SIDE VIEW Nip. 19720702 200112 1 002
10
KONSULTAN PELAKSANA
Hand Hole
15
CV. DIAMETER DESIGN CONSULTANT
DETAIL RIP PLATE
50
Anchor Bolt ø 22
Tiang Penyangga
5 40 5
Pipe 3”
Rip Plate Mur Baut 19"
5

ASRIZAL, ST
H2

DIREKTUR
15,7
50

40

SEGMENT A JUDUL GAMBAR SKALA


. 50 cm .

Pipe 6”
Pole ø 6.5"
Detail Tiang dan
5

Tanpa Skala
Ornament
Base Plate dia 16"
Rip Plate
BASE PLATE
dia 16"
TOP VIEW PEMERINTAH KABUPATEN ACEH BARAT
DETAIL SLIP JOINT
FRONT VIEW
50 TAMPAK ATAS

Kabel NYY

A
PROGRAM
50

B B
PENUNJANG PENGEMBANGAN
60.00 KETENAGALISTRIKAN (SHARING OTSUS)

A
KEGIATAN

PERENCANAAN DED SHARING OTSUS


TAHUN 2017 PEMASANGAN LAMPU
Muka Tanah JALAN DAN INSTALASI RUMAH MISKIN
10
50

SUMBER DANA :
SHARING OTSUS 2016
6 Base Plate t = 16 mm
Pipe ø 2.5” Tanah Urug
30

50
TAMPAK ATAS B
25
10 Batu Bata B LOKASI :
Muka Tanah Kabel NYY - JALAN IMAM BONJOL
Pipe ø 3.5”
5 Pasir POTONGAN B - B
5

MENYETUJUI
Beton K225 POTONGAN A - A
90

PVC ø 2.5”
50

KEPALA
DINAS PERTAMBANGAN DAN ENERGI
25
KABUPATEN ACEH BARAT
50

10 Pasir Tiang Sangga ø 3.5"


ʢ POLE
45

50
50

Pole
Plate t = 8 mm
100

Rip Plate Ir. SYAHRIL


PONDASI TIANG LAMPU Anchorot Bolt ø 22 Nip. 19630327 199003 1 002

25
Base Plate t = 16 mm
10
MENGETAHUI
50
10
5 40 5 PEJABAT PEMBUAT KOMITMEN (PPK)
FRONT VIEW BIDANG MIGAS LISTRIK
50 15 DAN PEMANFAATAN ENERGI

BASE PLATE DETAIL RIP PLATE


SIDE VIEW

ENDI ALFIAN, ST
Nip. 19720702 200112 1 002

19
KONSULTAN PELAKSANA

100 110 20 CV. DIAMETER DESIGN CONSULTANT


Hole MCB Support
100 x 250 3x110x150
50
Anchor Bolt ø 22
5 40 5
250
230

150

Rip Plate
100

50

5
ASRIZAL, ST
Hole ø 8 mm Bolt ø 8 mm DIREKTUR
15,7

50

40
(TAPPNG)
JUDUL GAMBAR SKALA
Pole ø 6.5"
15

5
Detail Tapak Tiang Tanpa Skala

DETAIL HAND HOLE DETAIL ANCHOR BASE PLATE


TOP VIEW
PEMERINTAH KABUPATEN ACEH BARAT
PROGRAM

PENUNJANG PENGEMBANGAN
KETENAGALISTRIKAN (SHARING OTSUS)

KEGIATAN

PERENCANAAN DED SHARING OTSUS


TAHUN 2017 PEMASANGAN LAMPU
JALAN DAN INSTALASI RUMAH MISKIN

SUMBER DANA :
SHARING OTSUS 2016

LOKASI :

- JALAN IMAM BONJOL

MENYETUJUI

KEPALA
DINAS PERTAMBANGAN DAN ENERGI
KABUPATEN ACEH BARAT

Ir. SYAHRIL
Nip. 19630327 199003 1 002

MENGETAHUI

PEJABAT PEMBUAT KOMITMEN (PPK)


BIDANG MIGAS LISTRIK
DAN PEMANFAATAN ENERGI

ENDI ALFIAN, ST
Nip. 19720702 200112 1 002

KONSULTAN PELAKSANA

CV. DIAMETER DESIGN CONSULTANT

ASRIZAL, ST
DIREKTUR
JUDUL GAMBAR SKALA

Gambar Rancangan Tanpa Skala

PEMERINTAH KABUPATEN ACEH BARAT


FRONT VIEW
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PERTAMBANGAN DAN ENERGI
JL. Ujong Tanjong – Paya Peunaga Kec. Meureubo
Email; pertambangan.acehbarat@gmail.com

PROGRAM : PENUNJANG PENGEMBANGAN KETENAGALISTRIKAN (SHARING OTSUS)


PERENCANAAN DED SHARING OTSUS TAHUN 2017 PEMASANGAN LAMPU JALAN DAN INSTALASI
KEGIATAN :
RUMAH MISKIN
PEKERJAAN : PERENCANAAN TEKNIS PEMASANGAN LAMPU JALAN IMAM BONJOL

LOKASI : JALAN IMAM BONJOL

SUMBER DANA :
SHARING OTSUS TAHUN 2016

KONSULATAN : CV. DIAMETER DESIGN CONSULTANT


PELAKSANA