Anda di halaman 1dari 20

PERHITUNGAN ASHADI

NO. NILAI KONTRAK DASAR KENA PAJAK PPN PPH MASUK KE REKENING FEE 30%

1 11,484,600.00 10,440,545.45 1,044,054.55 417,621.82 10,022,923.64 3,006,877.09


10,440,545.45
2 4,018,300.00 3,653,000.00 365,300.00 146,120.00 3,506,880.00 1,052,064.00
3,653,000.00
3 11,000,000.00 10,000,000.00 1,000,000.00 400,000.00 9,600,000.00 2,880,000.00
10,000,000.00

TOTAL 6,938,941.09

NO NAMA PEKERJAAN NILAI KNTRAK MASUK REK PNJM BENDERA 7,5% KWJPAN 30%
1 perencanaan tinalan 11,484,600.00 10,022,923.64 751,719.27 3,006,877.09

2 perencanaan sal kel lerboyo 4,018,300.00 3,506,880.00 263,016.00 1,052,064.00

3 perencanaan binamarga 11,000,000.00 9,600,000.00 720,000.00 2,880,000.00

TOTAL
ITUNGAN ASHADI
KONTROL

11,484,600.00

4,018,300.00

11,000,000.00

BERSIH
6,264,327.27

2,191,800.00

6,000,000.00

14,456,127.27
PROYEK PERENCANAAN DINAS PEKERJAAN UMUM KOTA KEDIRI TAHUN ANGGARAN 2018
GRAHA MAKMUR CONSULTANT
NO. NILAI KONTRAK DASAR KENA PAJAK PPN PPH (ps4) Nilai yg masuk rekening Vi Kwajiban 30% NAMA PEKERJAAN

1 9,064,000.00 8,240,000.00 824,000.00 329,600.00 7,910,400.00


8,240,000.00

2 49,950,000.00 45,409,090.91 4,540,909.09 1,816,363.64


45,409,090.91

3 39,950,000.00 36,318,181.82 3,631,818.18 1,452,727.27


36,318,181.82

4 36,375,000.00 33,068,181.82 3,306,818.18 1,322,727.27


33,068,181.82

5 14,932,000.00 13,574,545.45 1,357,454.55 542,981.82


13,574,545.45

TOTAL 150,271,000.00

NO NILAI KONTRAK KWAJIBAN 30% TERBAYAR PENERIMA TANDA TANGAN YG BERTANGGUNG NAMA PAKET
JAWAB
NO. NILAI KONTRAK DASAR KENA PAJAK PPN PPH

1 145,310,000.00 132,100,000.00 13,210,000.00 5,284,000.00


132,100,000.00

2 39,325,000.00 35,750,000.00 3,575,000.00 1,430,000.00


35,750,000.00

3 24,805,000.00 22,550,000.00 2,255,000.00 902,000.00


22,550,000.00

4 13,950,000.00 12,681,818.18 1,268,181.82 507,272.73


12,681,818.18

5 7,975,000.00 7,250,000.00 725,000.00 290,000.00


7,250,000.00

6 45,320,000.00 41,200,000.00 4,120,000.00 1,648,000.00


41,200,000.00
MASUK KE REKENING KONTROL

126,816,000.00 145,310,000.00

34,320,000.00 39,325,000.00

21,648,000.00 24,805,000.00

12,174,545.45 13,950,000.00

6,960,000.00 7,975,000.00

39,552,000.00 45,320,000.00
PAKET KTT

PENGAWASAN TANAH KUNING-BINAI


DI KECAMATAN TANJUNG PALAS TIMUR

PENGAWASAN TEKNIS :
- PEMBANGUNAN JALAN GANG BHAKTI DI JALAN PRAMUKA
KELURAHAN TANJUNG PALAS TENGAH
- PEMBUATAN GORONG-GORONG DI TANJUNG PALAS HILIR

PENGAWASAN AIR BERSIH KECAMATAN SEKATAK

PENGAWASAN PENATAAN LINGKUNGAN DI KECAMATAN SEKATAK

Program Pengembangan Wilayah Transmigrasi


Pekerjaan Supervisi/Pengawasan Pembangunan
Puskesmas Pembantu dan Gedung SD Lokasi Transmigrasi
Tanjung Buka SP. 5 Kabupaten Bulungan

PENGAWASAN TEKNIS REHABILITASI SEDANG SD


S REHABILITASI SEDANG SDN 007 TANJUNG PALAS
NILAI KONTRAK DASAR KENA PAJAK PPH MASUK KE REKENING
NO. HPS ( Rp.) ( Rp. ) PPN ( Rp. ) ( Rp. ) ( Rp. )

1 17,105,000.00 16,105,000.00 14,640,909.09 1,464,090.91 292,818.18 14,348,090.91


14,640,909.09

2 25,850,000.00 24,850,000.00 22,590,909.09 2,259,090.91 903,636.36 21,687,272.73


22,590,909.09

2 25,850,000.00 24,850,000.00 22,590,909.09 2,259,090.91 903,636.36 21,687,272.73


22,590,909.09

TOTAL 57,722,636.36

ADMINISTRASI 10%
FEE 30 % ( (sewa alat.bayar
Rp. ) BENDERA 10% pencairan jaminan MANSUR ppk KONTROL
produk),dll

4,304,427.27 1,434,809.09 1,434,809.09 3,587,022.73 500,000.00 16,105,000.00

6,506,181.82 2,168,727.27 2,168,727.27 5,421,818.18 500,000.00 24,850,000.00

6,506,181.82 2,168,727.27 2,168,727.27 5,421,818.18 500,000.00 24,850,000.00

17,316,790.91 5,772,263.64 5,772,263.64 14,430,659.09 1,500,000.00 12,930,659.09


NILAI KONTRAK DASAR KENA PAJAK PPN PPH MASUK KE REKENING
NO.
( Rp.) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )

1 28,400,000.00 25,818,181.82 2,581,818.18 1,032,727.27 24,785,454.55 24,785,454.55


25,818,181.82

TENAGA GAMBAR
NO. MASUK REKENING FEE BENDERA FEE DINAS KEPERLUAN Pinjam Tenaga Ahli 2 ska TOTAL
pembuatan produk 2
ADMINISTRASI
Orang

24,785,454.55 3,717,818.18 7,435,636.36 3,717,818.18 4,957,090.91 1,000,000.00 3,957,090.91

Kesepakatan Bagi 2

3,957,090.91 : 2

1,978,545.45
dinas toro fotokopi nyangoni
24,785,454.55 7,435,636.36 2,000,000.00 1,000,000.00

- 8,490,909.09 1,858,909.09
mas alwan
4,000,000.00 14,435,636.36

10,349,818.18
MASUK KE KEWAJIBAN KE TOTAL
NO. NILAI KONTRAK BENDERA 7,5% NAMA CV
REKENING DINAS 30% PENERIMAAAN

1 15,769,600.00 13,762,560.00 1,032,192.00 4,128,768.00 CV.SINAR MULYO 8,601,600.00

2 15,763,000.00 13,756,800.00 1,031,760.00 4,127,040.00 CV.SINAR MULYO 8,598,000.00

3 13,557,500.00 11,832,000.00 887,400.00 3,549,600.00 CV.GARDATAMA 7,395,000.00

2,951,352.00 11,805,408.00 - 24,594,600.00


keterangan

TOTAL PENERIMAAN MERUPAKAN LABA


KOTOR KARENA BELUM TERMASUK
BIAYA ADMINISTRASI BIAYA PPHP BIAYA
KONTRAK BIAYA FOTOKOPI BIAYA SEWA
ALAT BIAYA AKOMODASI TRANSPOT
DAN BIAYA KARYAWAN YANG TERLIBAT
DIDALAMNYA
PEMBAGIAN ANGGARAN
NO. PAGU ANGGARAN NILAI PERENCANAAN NILAI PENGAWASAN PENGELOLAAN KEGIATAN
4% 2.80% 4%
1 1,500,000,000 60,000,000 42,000,000 60,000,000
2
3
4

PPN PPH
NO. NILAI KONTRAK DASAR KENA PAJAK
10% 4%
1 60,000,000 54,545,455 5,454,545 2,181,818
2 42,000,000 38,181,818 3,818,182 1,527,273
3 60,000,000 54,545,455 5,454,545 2,181,818
4 1,338,000,000 1,216,363,636 121,636,364 48,654,545
PEMBAGIAN ANGGARAN
NILAI FISIK
SISA
1,338,000,000

MASUK KE REKENING

52,363,636
36,654,545
52,363,636
1,167,709,091
Rekap Kerjasama Tim Toyoresmi Dengan Mas Qoiron

Nama NILAI KONTRAK DASAR KENA PAJAK PPN PPH MASUK KE REKENING Keterangan
Kontrak/Dinas ( Rp.) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )

Pengawasan
pelengseng
Ringinanom 9,828,000.00 8,934,545.45 893,454.55 357,381.82 8,577,163.64 Sudah Terbayar

Perencanaan
13,792,000.00 12,538,181.82 1,253,818.18 501,527.27 12,036,654.55 Belum Terbayar
Plengseng Ngadirejo
12,538,181.82

Ipal Dinkes
29,562,500.00 26,875,000.00 2,687,500.00 1,075,000.00 25,800,000.00 Sudah Terbayar
Pengawasan
26,875,000.00
Perencanaan
Pavingisasi 9,498,000.00 8,634,545.45 863,454.55 345,381.82 8,289,163.64 Belum Terbayar
Manisrenggo 8,634,545.45

Pengawasan Pagar 2,550,000.00 2,318,181.82 231,818.18 92,727.27 2,225,454.55 Belum Terbayar


2,318,181.82

Pengawasan Pagar 2,550,000.00 2,318,181.82 231,818.18 92,727.27 2,225,454.55 Belum Terbayar


2,318,181.82
Rekap Kerjasama Tim Toyoresmi Dengan Mas Qoiron

Nama NILAI KONTRAK DASAR KENA PAJAK PPN PPH MASUK KE REKENING
Kontrak/Dinas ( Rp.) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )

11,033,000.00 10,030,000.00 1,003,000.00 401,200.00 9,628,800.00

13,343,000.00 12,130,000.00 1,213,000.00 485,200.00 11,644,800.00


12,130,000.00

9,878,000.00 8,980,000.00 898,000.00 359,200.00 8,620,800.00


8,980,000.00

9,460,000.00 8,600,000.00 860,000.00 344,000.00 8,256,000.00


8,600,000.00

9,460,000.00 8,600,000.00 860,000.00 344,000.00 8,256,000.00


8,600,000.00

46,406,400.00

Nama NILAI KONTRAK DASAR KENA PAJAK PPN PPH MASUK KE REKENING
Kontrak/Dinas ( Rp.) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )

25,547,000.00 23,224,545.45 2,322,454.55 928,981.82 22,295,563.64

16,804,700.00 15,277,000.00 1,527,700.00 611,080.00 14,665,920.00


15,277,000.00

25,549,700.00 23,227,000.00 2,322,700.00 929,080.00 22,297,920.00


23,227,000.00

59,259,403.64

Vi dinas setelah dipotong ve ve bendera 10%


Pendapatan Kotor Pengawasan 46,406,400.00 9,281,280.00 37,125,120.00 4,640,640.00 32,484,480.00
Perencanaan 59,259,403.64 17,777,821.09 41,481,582.55 5,925,940.36 35,555,642.18
105,665,803.64 78,606,702.55

pengeluaran hak mansur


pengawasan Rp 7,081,000
perencanaan Rp 5,815,000 Rp 12,500,000
Rp 12,896,000

setelah dipotong
pengawasan Rp 25,403,480 Rp 12,701,740
perencanaan Rp 17,240,642
pendapatan bersih mbah hari Rp 29,942,382

vi dipotong Pengeluaran dr mas ipul


46,406,400.00 1,781,280.00 20%
59,259,403.64 17,777,821.09 30%
105,665,803.64 19,559,101.09

Rp 5,000,000 mas ipul


Rp 1,000,000
Rp 500,000
__ Rp 1,000,000
7,500,000.00
PENGAWASAN 5 PAKET BINA MARGA

Tanggal PEMASUKAN KETERANGAN NO.


SAIFUL 1
2
3
4
5
6
7
8
9
10
11

JUMLAH Rp 500,000
SALDO -Rp 6,581,000

PERENCANAAN 3 PAKET PAK 2018

Tanggal PEMASUKAN KETERANGAN NO.


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

JUMLAH Rp -
SALDO -Rp 5,815,000
SAIFUL
Tanggal PEMASUKAN KETERANGAN NO.
1
2
3
4
5
6
7
8
9
10
11
12
13

JUMLAH Rp -
SALDO -Rp 145,000
Tanggal PENGELUARAN KETERANGAN
Materai 6000 @20 lbr ( 5 KONTRAK) 120000
Materai 6000 @2 lbr (Pembenahan KONTRAK) Rp 12,000
Materai 6000 @5 lbr (KWITANSI) Rp 30,000
Jaminan Pemiliharaan 5 paket @Rp.70.000 Rp 350,000
Ketua PPHP , 5 paket Rp 300,000
Team PPHP @Rp. 50.000, 2 org , 5 paket Rp 500,000
Kwitansi @Rp. 50.000, 2 org, 5 paket Rp 500,000
Keuangan (H) Rp 200,000
Laporan 4 rangakp, 5 paket @Rp. 100.000 Rp 2,000,000 PREDIKSI
Foto Kopi Pencairan Rp 63,000
Foto Kopi Pencairan Rp 6,000
Flasdisk 5 paket @Rp. 100.000 Rp 500,000
penawaran 5 paket @500.000 Rp 2,500,000

JUMLAH Rp 7,081,000

Tanggal PENGELUARAN KETERANGAN


Materai 6000 @12 lbr ( 3 KONTRAK) 72000
Materai 6000 @3 lbr (KWITANSI) Rp 18,000
Jaminan Pemiliharaan 3 paket @Rp.75.000 Rp 225,000
Ketua PPHP @Rp. 100.000, 3 paket Rp 300,000
Kwitansi @Rp. 50.000, 2 org, 3 paket Rp 300,000
Keuangan (H) Rp 100,000
PRODUK 5 rangakp, 3 paket (per paket Rp. 750.000) Rp 2,250,000 PREDIKSI
Foto Kopi Pencairan Rp 150,000
Flasdisk 3 paket @Rp. 100.000 Rp 300,000
penawaran 3 paket @500.000 Rp 1,500,000
sewa alat waterpas dan orang Rp 600,000

JUMLAH Rp 5,815,000
Tanggal PENGELUARAN KETERANGAN
Jaminan pengawasan 70000
Jaminan perencanaan Rp 75,000

JUMLAH Rp 145,000

Rp 13,041,000

Anda mungkin juga menyukai