Anda di halaman 1dari 10

101.846 1.

584

1.850

1.800
e0

1.750 f
A Kemiringan Garis
n Konsolidasi Asli = Cc
g b
k 1.700
a
a d
P 1.650
o c
Kemiringan Garis
r Kurva Rebound = Cr
i 1.600

(
e 0.4 e0
1.550
)

1.500

σ0= 50 kPa σp1=103 kPa σp2=1003 kPa


1.450
10.000 100.000 1000.000

Tekanan Normal (kPa)

Grafik angka pori (e) vs tekanan normal (σ)


Waktu Pembacaan
Waktu t
(min) gage mm
0 0 0 0.00 0 Grafik Konsolid
6'' 0.1 0.316 29.2 0.292 0.1 1 Waktu
10 (min)
15'' 0.25 0.500 34 0.34 0
t1
30'' 0.5 0.707 35.5 0.355

Pembacaan (mm)
0.5
d0
1 1 1.000 41 0.41
1
2 2 1.414 45.5 0.455 a
4 4 2.000 50 0.5 d50 1.5

6 6 2.449 53.9 0.539 2


9 9 3.000 58.1 0.581
d100 2.5
12 12 3.464 61.2 0.612
3
16 16 4.000 64.5 0.645
25 25 5.000 69.8 0.698 3.5
36 36 6.000 73 0.73 4
45 45 6.708 75.1 0.751
4.5
60 60 7.746 76.5 0.765
120 120 10.954 77.1 0.771 5
240 240 15.492 78.3 0.783
1440 1440 37.947 81.5 0.815

Waktu Pembacaan
Waktu t
(min) gage mm Grafik Kon
0 0 0 214.5 2.145 Waktu
0.1 1 10
6'' 0.1 0.316 218 2.18 2.15
15'' 0.25 0.5 218.5 2.185 t1
Pembacaan (mm)

30'' 0.5 0.707 218.6 2.186 d0 2.2


1 1 1 219 2.19
2 2 1.414 219.8 2.198 a
2.25
4 4 2 220.5 2.205
d50
6 6 2.449 221 2.21
2.3
9 9 3 223 2.23
12 12 3.464 223.9 2.239
16 16 4 225 2.25 d100
2.35

25 25 5 226.7 2.267
36 36 6 229.2 2.292 2.4
45 45 6.708 230.6 2.306
60 60 7.746 231 2.31 2.45
120 120 10.954 233.1 2.331
240 240 15.492 235.5 2.355
1440 1440 37.947 239 2.39
0.475

Waktu Pembacaan
Waktu t
(min) gage mm
0 0 0 239 2.39 Grafik Kon
6'' 0.1 0.316 246 2.46 0.1 1 Waktu
10
15'' 0.25 0.5 248 2.48 2.2
t1

Pembacaan (mm)
30'' 0.5 0.707 250 2.5
2.3
1 1 1 252 2.52
d0
2 2 1.414 255.2 2.552
2.4
4 4 2 259.3 2.593 a
6 6 2.449 260 2.6 2.5
9 9 3 265.4 2.654
d50
12 12 3.464 267.5 2.675 2.6
16 16 4 269.2 2.692
25 25 5 271.4 2.714 2.7
36 36 6 273 2.73
45 45 6.708 273.8 2.738 d100 2.8

60 60 7.746 274 2.74


120 120 10.954 275.5 2.755 2.9

240 240 15.492 276.9 2.769


1440 1440 37.947 279 2.79

0.575 5.885

Waktu Pembacaan
Waktu t
(min) gage mm Grafik Kon
0 0 0 279 2.79 0.1 1 Waktu
10
6'' 0.1 0.316 285 2.85 2.6
t1
Pembacaan (mm)

15'' 0.25 0.5 287 2.87


2.7
30'' 0.5 0.707 290 2.9 d0
1 1 1 294 2.94 2.8
2 2 1.414 300 3 a
2.9
4 4 2 306.5 3.065
6 6 2.449 311 3.11 d50 3
9 9 3 316 3.16
12 12 3.464 319 3.19 3.1
16 16 4 321.6 3.216
3.2
25 25 5 324.1 3.241
36 36 6 326 3.26 d1003.3

45 45 6.708 327 3.27


60 60 7.746 327.2 3.272 3.4
3.3

3.4

120 120 10.954 329 3.29


240 240 15.492 330.8 3.308
1440 1440 37.947 333.8 3.338
0.595 7.275

Waktu Pembacaan
t
(min) gage mm
Grafik Kon
0 0 333.8 3.338
0.1 1 Waktu
10
0.1 0.316 339 3.39 3
0.25 0.5 348 3.48 t1

Pembacaan (mm)
0.5 0.707 356 3.56 3.2
1 1 362 3.62
2 1.414 371 3.71 3.4
a
4 2 383 3.83
3.6
6 2.449 390 3.9 d0

9 3 396 3.96 3.8


12 3.464 398.8 3.988
16 4 400.8 4.008 d50 4
25 5 403 4.03
36 6 404.7 4.047 4.2
d100
45 6.708 405.5 4.055
4.4
60 7.746 406 4.06
120 10.954 407.6 4.076
240 15.492 410 4.1
1440 37.947 419 4.19
0.715 8.835
Grafik Konsolidasi 0.5 kg
1 Waktu
10 (min) 100 1000 10000

t50 4t1

t50 = 6

Hdr = 9.47125
Cv = 2.9453

3.7
1.85

Grafik Konsolidasi 1 kg
1 Waktu
10 (min) 100 1000 10000

t1 4t1 t50

t50 = 10.75
a

b
Hdr = 8.524
Cv = 1.332
Grafik Konsolidasi 2 kg
1 Waktu
10 (min) 100 1000 10000

t1 4t1 t50

t50 = 6
a
Hdr = 8.239
b
Cv = 2.228763

Grafik Konsolidasi 4 kg
1 Waktu
10 (min) 100 1000 10000

t1 t50 4t1
t50 = 6

Hdr = 8.045
a Cv = 2.125
b
Grafik Konsolidasi 8 kg
1 Waktu
10 (min) 100 1000 10000

t1 t50 4t1

t50 = 4
a

b Hdr = 7.978
Cv = 3.135
TABEL UJI KONSOLIDASI

Proyek
Lokasi
Beban Normal
(kg) (kPa)
0 0
0.5 25.461
1 50.923
2 101.846
4 203.692
8 407.384
4 203.692
2 101.846

Kemiringan Garis 0.6


Kurva Rebound = Cr
0.55
Kemiringan Garis
Konsolidasi Asli = Cc 0.5

0.45
0.4EO 0.2342312
0.4
0.708
Angka Pori (e)

0.35

e0 0.3

0.25

0.2

0,4e0 0.15

0.1

0.05
σpo = 51,835 kPa
0
10 100

Tekanan Normal
σpc = 80 kPa

σpmax = 500 kPa


Awal Beban Akhir Beban Hdr t90
(H) (mm) (H') (mm) (cm) (menit)
19.35 19.35 9.675 -
19.35 17.205 9.139 16
17.205 16.96 8.541 59.29
16.96 16.56 8.38 16
16.56 16.012 8.143 16
16.012 15.16 7.793 4
15.16 15.175 - -
15.175 15.2 - -

Dari grafik, didapatkan:


σpc =
σpo =
σpmax =
e0 =

Sehingga:
Cc =
Cr =
100 1000

Tekanan Normal (kPa)

Grafik angka pori (e) vs tekanan normal (σ)


Cv ButiranPori
(cm2/menit)(Hs) (mm)
(e)
- 12.2 0.585577916959
4.42663 12.2 0.41
1.0433544 12.2 0.39
3.7218932 12.2 0.357
3.5143478 12.2 0.312
12.87494 12.2 0.242
- 12.2 0.243
- 12.2 0.246

-1.894422

Dari grafik, didapatkan:


80 kPa
51.835 kPa
kPa
0.6

Err:502
-10.052