PEMBANGUNAN RUMAH TINGGAL LANTAI 2

( PERMANEN )
CV. DIAGONAL PRISMALOKA CONSULTANT

planning and design engineering consultant

Alamat : Jalan Ternate Telp - Fax. (0971) 327 013 Merauke - Papua

REKAPITULASI :
KEGIATAN : BELANJA MODAL PENGADAAN KONSTRUKSI / PEMBELIAN GEDUNG KANTOR
PEKERJAAN : MENEJEMEN KONTRUKSI DAN ESTIMASI BIAYA
LOKASI : AGUS PUTRA LAKSONO
TAHUN ANGGARAN : 2018-22-201-003

No. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA

1 2 3 4 5

I. PEMBANGUNAN GEDUNG KHUSUS :

1 PEMBANGUNAN PERUMAHAN PERIKANAN 3.00 M2 Rp. ### Rp. 3,951,363,175.29


JUMLAH I Rp. 3,951,363,175.29

II. PEMB. PRASARANA DAN SARANA LINGK. GEDUNG :

1 PENIMBUNAN AREAL 216.00 M3 Rp. 397,534.00 Rp. 85,867,344.00


J U M L A H II Rp. 85,867,344.00

REAL COST (RC) T O T A L ( I + II ) Rp. 4,037,230,519.29


PERENCANAAN ( 4 % x RC ) ................................................................... Rp. 161,489,220.77
PENGAWASAN ( 3 % x RC ) ................................................................... Rp. 121,116,915.58
J U M L A H ................................................................... Rp. 4,319,836,655.64
PPN 10 % ................................................................... Rp. 431,983,665.56
T O T A L ................................................................... Rp. 4,751,820,321.20
DIBULATKAN ................................................................... Rp. 4,751,820,000.00

Terbilang :" Satu Miliar Tiga Ratus Juta Rupiah,-"

#VALUE!

Diperiksa, #REF!
KEPALA LABORATORIUM BPPMHP #REF!
KABUPATEN MERAUKE #REF!

HARI SUGIARTO, A.Pi, S.Sos #REF!


NIP. 19610712 198703 1 012 #REF!

Mengetahui, Menyetujui,
An, KEPALA KANTOR WILAYAH KEPALA LEMBAGA PEMASYARAKATAN
KEPALA DEVISI PEMASYARAKATAN KELAS II B MERAUKE

Drs. GUNARSO, Bc.IP ABDUL KARIM, AMD.IP.S.Sos Msi


NIP. 19580923 198103 1 002 NIP. 19690712 199503 1 001

Mengetahui,
An, DIREKTUR JENDERAL PEMASYARAKATAN
SEKRETARIS JENDERAL PEMASYARAKATAN

Drs. DINDIN SUDIRMAN, Bc.IP,SH,M.SI


NIP. 19511105 197511 1 001
BEKAP DATA PERHITUNGAN RUMAH LANTAI 2 ( PERMANEN )

I. PEKERJAAN PERSIAPAN
1. Pembersihan Lokasi

Panjang = 14.0 m
Lebar = 24 m
Rumus = (P + 1) x (L + 1)
Luas = ( 14 + 1) x ( 24 + 1 )
= 375 M2
2. Pemasangan Papan Nama Proyek
Pemasangan Papan Nama Proyek = 1.00 Ls

3. Gudang Semen dan Peralatan

Gudang Semen dan Peralatan = Panjang x Lebar


= 3,5 x 8
= 28 M2
4. Pengukuran dan Pemasangan Bouwplank

Panjang = 9.5 m
Lebar = 21 m
Keliling = ( Panjang x 1,5 ) + ( Lebar x 1,5 )
= ( 9,5 x 1,5) + ( 21 x 1,5 )
= 45.75 M1
II. PEKERJAAN TANAH DAN PASIR
1. Galian Tanah Pondasi
A Pondasi Menerus
Lebar bawah pondasi = 0.8 m
Galian tanah = 0.4 m
Panjang Pondasi
H = 4+18+3+4+2+7,5+3+10,5+1,5+21+4
V = 4+2,5+4+1,5+4+1,5+4+1,5+6+1,5+2+2+5,5+1,5+6
H+V = 126 m
Rumus = Lebar B P x Galian T P x Panjang P
Volume = 40.32 M3
B Pondasi Poerplat
Lebar bawah pondasi = 1.2 m
Panjang bawah pondasi = 1.2 m
Galian tanah = 0.1 m
Banyak Galian P.poerplat = 24 bh
= (1,2 x 1,2 x 0,1 ) x 24
= 3.456 M3
C Total A + B 40,32 + 3,456 = 43.78 M3

2. Urugan Tanah Kembali


Rumus = Hasil dari Galian Tanah Pondasi 1/3 = 43,78 : 3 = 14.59

3. Urugan Tanah Peninggian Lantai


Luas bagunan Lantai 1 = 21 x 10 =
Peninggian Lantai =
Rumus = Luas Bangunan Lt 1 x Peninggian Lantai
= 210 x 0,71
= 149.1
4. Urugan Pasir Bawah Pondasi
A Pondasi Menerus
Panjang Urugan Pasir dibawah Pondasi =
Tebal Urugan Pasir =
Lebar Urugan Pasir Bawah Pondasi =
Rumus = Panjang U P x Tebal U P x Lebar U P =
B Pondasi Poerplat
Lebar bawah pondasi = 1.2 m
Panjang bawah pondasi = 1.2 m
Urugan Pasir = 0.1 m
Banyak Galian P.poerplat = 24 bh
= (1,2 x 1,2 x 0,1 ) x 24
= 3.456 M3
C Total A + B = 13.54 M3

5. Pas. Jendela Kaca Ungkit 144 x 140 cm ( J2 )

Luas bagunan Lantai 1 = (4x2)+(4x3)+(18x6)+(4x1,50) =


Tebal Urugan Pasir =
Rumus =
Luas Bangunan Lantai 1 x Tebal U Pasir =

III. PEKERJAAN PONDASI DAN BETON

1. Lantai Kerja Tebal 10 cm

Panjang Lantai Kerja = 1.2 m


Lebar Lantai Kerja = 1.2 m
Tebal Lantai Kerja = 0.1 m
Banyaknya Lantai Kerja = 24 Bh
Rumus =
( Panjang LK x Lebar LK x Tebal LK ) x Banyak LK =

2. Pondasi Poer B. Bertulang

Tinggi P.Poerplat = 1.5 m


Panjang P.Poerplat' = 0.3 m
Lebar P.Poerplat' = 0.3 m
Banyaknya P.Poerplat = 24 Bh
Panjang P.Poerplat = 1 m
Lebar P.Poerplat = 1 m
Tebal P.Poerplat = 0.3 m
Rumus =
(( Tinggi PP x Panjang PP' x Lebar PP') + ( P PP x L PP x T PP )) x Banyak PP
=
3. Pas. Pondasi Batu Bata
A Pondasi Menerus
Panjang Pondasi Keliling = 126 m
Lebar atas Pondasi = 0.25 m
Lebar Bawah Pondasi = 0.70 m
Tinggi Pondasi = 0.70 m
Rumus =
((L atas + L bawah )/2) x Tinggi P x Panjang P
(( 0,25 + 0,7)/2) x 0,7 x 126 = 41.90 M3
4. Sloof B.Bertulang 20 x 30 cm

Panjang Sloof = 0.30 m


Lebar Sloof = 0.20 m
Panjang Sloof Keliling = 126 m
Rumus =
Panjang x Lebar x ( Panjang Sloof )
0,30 x 0,20 x 126 = 7.56 M3

5. Kolom Utama 15 x 25 B. Bertulang


Panjang Kolom = 0.25 m
Lebar Kolom = 0.15 m
Tinggi Kolom Lt 1 = 4 m
Tinggi Kolom Lt 2 = 3 m
Banyak Kolom Lt 1 = 24 Bh
Banyak Kolom Lt 2 = 23 Bh
Rumus =
P x L x (( TK Lt 1 * BK Lt 1 ) + ( TK Lt 2 x BK Lt 2 ))
0,25 x 0,15 (4 x 24)+(3 x 23 ) = 6.19 M3

6. Kolom Praktis 15 x 15 B. Bertulang


Panjang Kolom = 0.15 m
Lebar Kolom = 0.15 m
Tinggi Kolom Lt 1 = 4 m
Tinggi Kolom Lt 2 = 3 m
Banyak Kolom Lt 1 = 20 Bh
Banyak Kolom Lt 2 = 11 Bh
Rumus =
P x L x (( TK Lt 1 * BK Lt 1 ) + ( TK Lt 2 x BK Lt 2 ))
0,15 x 0,15 (4 x 20 )+( 3 x 11 ) = 2.54 M3

7. Balok Utama 20 x 30 cm B. Bertulang

Panjang BU = 0.30 m
Lebar BU = 0.20 m
Panjang Keliling BU
H = 4+18+3+4+2+7,5+3+10,5+1,5+21+4
V = 4+2+6+1,5+6+1,5+6+1,5+9,5+2+2+5,5+1,5+6
V+H = 133.5 m
Rumus =
Panjang BU x lebar BU x (P.Keliling BU)
0,30 x 0,20 x ( 133,5 ) = 8.01 M3

8. Ring Balk 20 x 30 cm B. Bertulang

Panjang RB = 0.30 m
Lebar RB = 0.20 m
Panjang Keliling RB
V = 6+1,5+4+1,5+4+1,5+4+2+4+1,5+6
H = 18+4+2+7,5+10,5+1,5+21
V+H = 100.5 m
Rumus =
Panjang RB x lebar RB x (P.Keliling RB)
0,30 x 0,20 x ( 100,5 ) = 6.03 M3
9. Cor Plat Lantai Tebal 5 cm

Luas Cor Plat Dak = 8+108+6 =


Tebal Cor Plat Dak =
Rumus = Tebal Lantai 2 x Luas Bangunan Lantai 2 =

10. Cor Tangga Beton B. Bertulang

a Volume Anak Tangga


Panjang Anak Tangga = 0.2 m
Lebar Anak Tangga = 0.3 m
Lebar Tangga = 1.80 m
Rumus = (( Panjang x Lebar )/2) x Lebar tangga
V total 0,20 x 0,30 x 1,80 = 0.054 m

Banyak Anak Tangga = 21 Bh


V total x Banyak AT
0,054 x 21 = 1.134 m3
b Volume Plat Tangga
Tebal = 0.12 m
Lebar Tangga = 1.8 m
Panjang total Tangga = 8.75 m
Rumus = Tebal Tangga x Lebar Tangga x Panjang Total Tangga
0,12 x 1,8 x 8,75 = 1.89 m3
c Volume Anak Tangga + Volume Plat Tangga
1,134 x 1,89 = 3.02 M3

11. Cor Plat Dak Tebal 12 cm

Tebal Cor Plat Dak = 0,12 m


Luas Cor Plat Dak = (4x2)+(4x3)+(4x1,5) =
Rumus = Tebal Cor Plat Dak x Luas Cor Plat Dak =

IV. PEKERJAAN PASANGAN DAN PLESTERAN

1. Pas. Dinding 1/2 Bata

A Panjang Dinding Lantai 1


a. Panjang Dinding Lantai 1
H = 4+16+14,5+15+21
v = 4+2,5+4,5+1,5+4,5+1,5+4,5+1,5+6,5+2+2+4+1,5+6
V total = 117 m
b. Tinggi Dinding Lantai 1 = 4 m
c. Luasan Pintu dan jendela
P1 = 1,7 x 2,1 x 1 = 3.57 m2
P2 = 0,8 x 2,1 x 4 = 8.4 m2
P3 = 0,7 x 2,1 x 6 = 8.82 m2
J1 = 1,68 x 2 x 3 = 10.08 m2
J2 = 1,14 x 1,40 x 4 = 6.384 m2
V1 = 0,7 x 1,14 x 7 = 5.586
Total Luasan Pintu Jendela = 42.84 m2
d. Rumus = ( a x b ) - c = ( 117 x 4 ) - 42,84
= 425.16 m2

B Panjang Dinding Lantai 2

a. Panjang Dinding Lantai 2


H = 4+16+9,5+12+18
V = 6,5+1,5+4,5+1,5+4,5+1,5+6,5+2+5,5+1,5+6
V total = 101 m
b. Tinggi Dinding Lantai 2 = 3m
c. Luasan Pintu dan jendela
P2 = 0,8 x 2,1 x 4 = 6.72 m2
P3 = 0,7 x 2,1 x 4 = 5.88 m2
J2 = 1,14 x 1,40 x 4 = 6.384 m2
J3 = 2,22 x 1,40 x 3 = 9.324
V1 = 0,7 x 1,14 x 4 = 3.192
Total Luasan Pintu Jendela Ventilas = 18.984 m2
d. Rumus = ( a x b ) - c = ( 86,5 x 2,7 ) - 9,983
= 253.716 m2
C Panjang Dinding Atap
a. Panjang Dinding Stap
H = 10 x 6
V = 14 x 4
V total = 116 m
b. Tinggi Dinding Atap = 0,3 m
c. Rumus = a x b = 34.8 m2

D Total Luasan Pasangan Dinding 1/2 bata T


a. A+B = 678.876 m2
b. Lebar Batu Bata = = 0.1 m
c. Rumus = a x b = 67.89 M3

2. Plesteran Tebal 20 mm
Rumus = Pas.Dinding 1/2 Bata x 2 = 662,076 x 2 =

3. Cor Lantai, Tebal : 5 cm


Luas bagunan Lantai 1 = 122 m2
Tebal Cor = 0.05 m
Rumus = Luas Bangunan Lantai 1 x Tebal cor Lantai
= 6.1 M3
V. PEKERJAAN LANTAI DAN DINDING

1. Pas. Lantai Keramik Uk. 60 x 60 cm

a. Luas bagunan Lantai 1


Luas bagunan Lantai 1 = (4x2)+(4x3)+(18x6)+(4x1,50) =
Luas Km/Wc = (2X2)X3+(1,5X1,5)X1+(2X1,5) =
Luas Teras = 1,5 x 4 =
Rumus = ( Luas B.Lantai 1 + Luas Teras )- Luas Km/Wc =

b. Luas bagunan Lantai 2


Luas bagunan Lantai 2 = (4 X 2)+(18 X 6)+(4 X 1,5) =
Luas Km/Wc = (2X2)X3+(1,5X1,5)X1 =
Luas Tangga = 2x4 =
Rumus = ( Luas B.Lantai 2 + Luas Tangga )- Luas Km/Wc =

c. Luas Bangunan Total = a+b =

2. Pas. Lantai Keramik Tangga Uk. 30 x 30 cm

Tangga Ruas 1

Lebar Tangga = 0.90 m


Banyak Anak Tangga R1 = 10 m
Tinggi Anak Tangga = 0.2 m
Luas Tangga Ruas 2 = 1,5 x 0,9 =
= 1.8 M2
Tangga Ruas 2

Lebar Tangga = 0.90 m


Banyak Anak Tangga R2 = 10 m
Tinggi Anak Tangga = 0.2 m
Rumus = Luas Tangga x Tinggi Anak Tangga x Banyak Anak tangga
= 1.8 M2
Panjang Bordes = 1.85 m
Lebar Bordes = 0.80 m
Luas Bordes = 1.48 M2
Rumus = Tangga ruas 1 + Tangga Ruas 2 + Luasan Bordes
1,8 +1,8 + 148 = 5.08 M2

3. Pas. Lantai Keramik KM/WC Uk. 20 x 20 cm

Km/wc lantai 1
Km/wc 1 = ( 2 x 1,5 ) x 5 = 15 m2
Km/wc 2 = ( 1,5 x 1,5 ) x 1 = 2.25 m2
V Total Km/Wc = 17.25

Km/wc lantai 2
Km/wc 1 = ( 2 x 1,5 ) x 3 = 9 m
Km/wc 2 = ( 1,5 x 1,5 ) x 1 = 2.25 m
V Total Km/Wc = 11.25

V Total Km/Wc lantai 1 dan 2 = 17.25 m2

4 Pas. Dinding Keramik KM/WC Uk. 20 x 20 cm, tinggi : 1,2 m

Km/wc lantai 1
Km/wc 1 = (1,35+1,85+1,35+1,03)x2 = 11.16
Km/wc 2 = (1,85+1,35+1,85+0,53)x2 = 11.16
Km/wc 3 = (1,35+1,35+1,35+0,53)x1 = 4.58
V Total Km/Wc = 26.9

Km/wc lantai 2
Km/wc 1 = (1,35+1,85+1,35+1,03)x2 = 11.16
Km/wc 3 = (1,35+1,35+1,35+0,53)x1 = 4.58
V Total Km/Wc = 15.74

Volume Total Km/Wc = 42.64


Tinggi Dinding Yang Mau dikeramik = 1.2
Rumus = Panjang Km/wc Total x Tinggi = 51.168

VI. PEKERJAAN ATAP

1. Pas. Rangka Kuda-kuda & Skor 5/8 cm (Kayu Klas II )

Bawah Kaki kuda - kuda 7,94 x 2 =


Kuda - Kuda Miring 4,08 x 2 =
Balok Gapit 4,17 x 2 =
Balok skor ( 0,89 x 2) + ( 1,31 x 2 ) =
Tiang Penyangga ( 0,26 x 2 ) + ( 0,58 x 2 ) =
Tiang Raja 1.07 =
Bawah Kaki kuda - kuda = 4.0 Bh
Kuda - Kuda Miring = 1.0 Bh
Balok Gapit = 3.0 Bh
Balok skor = 2.0 Bh
Tiang Penyangga = 2.0 Bh
Tiang Raja = 1 Bh
12.97 Bh

Total 1 Kuda - kuda = 13 Bh


Banyak Kuda - kuda = 10 Bh
= 130 Bh
Balok angin 4 Bh = 134 Bh
1 Kubik Kayu 5/10 cm
1/0,05/0,10/4 = 50 Bh
= 134 Bh : 50 Bh
= 2.680 M3
2. Pas. Gording 5/8 cm ( Kayu Klas II )

a Sisi Depan
Panjang Gording = 17,85 x 14
= 249.9 m
Sisi Depan + Sisi Belakang = 499.8 m
b Sisi Samping Kanan
Panjang Gording = 12,12+10,57+9,12+7,57+6,22+4,77+3,32+1,6
= 55.29 m
c Total a = 499.8 m
d c:4 = 124.95 Bh
e d : 1 m3 kayu = 2.50 M3

3. Pas. Atap Seng Gelombang BJLS 0.20 mm

A. Sisi Kiri
a Sisi segitiga
alas = 5.6 m
Tinggi = 6 m
Rumus = (1/2 alas x tinggi) x 2 = 16.8
= 33.6 m2
b Segiempat
Panjang = 17.85
Lebar = 8.25
Rumus = P x L = 147.26 m2
c a+b = 147.26 m2
d C + Sisi kanan = 294.525 m2

B. Sisi Depan
a Sisi segitiga
alas = 11.1 m
Tinggi = 5.6 m
Rumus = (1/2 alas x tinggi) x 2 = 31.08
= 62.16 m2
b ax2 = 124.32 m2
C. Total A + B = 294.525 m2

4. Pas. Lisplank Kayu Kelas II

Lisplang Type 1
Lisplang Depan = 35.7 m
Lisplang Belakang = 35.7 m
Lisplang Samping Kiri = 15.25 m
Lisplang Samping Kanan = 15.25 m
Volume Total = 71.4 m

VII. PEKERJAAN PLAFOND

1. Pas. Rangka Plafond Kayu 5/5 cm


Hitungan Luas m2 Rangka Plafond
a Luas Plafond Lantai 1
(4x3)+(18x6)+(4x1,50) = 126
b Luas Plafond Lantai 2
(4 x 2 ) + (18 x 6 ) + ( 4 x 1,5 ) = 122
c Luas B Lt 1 + Luas B Lt 2 = 248

2. Pas. Plafond Gypsum t : 9 mm


Luas Bangunan Lt 1 + Lantai 2 = 248

VIII PEKERJAAN KUSEN PINTU DAN JENDELA

1 Pas. Kusen Pintu Dan Jendela

Luasan Pintu (P1) = (1,7 + 2,1 + 2,1) x 1 =


Luasan Pintu (P2) = (0,8 + 2,1 + 2,1) x 8 =
Luasan Pintu (P3) = (0,7 + 2,1 + 2,1) x 10 =
Luasan Jendela ( J1) = (1,68+1,68+1,68+2+2+2+2)x3 =
Luasan Jendela ( J2) = (1,40+1,40+1,40+1,40+1,40+2,22+2,22)x8 =
Luasan Jendela (J3) = (1,14+1,14+1,40+1,40+1,40)x3 =
Luasan Ventilasi (V1) = (0,7+0,7+1,14+1,14)x11 =
Luasan Ventilasi (V2) = (1+1+0,30+0,30)X7 =
=
=
=

2 Pas. Jendela Kaca Ungkit 168 x 200 cm ( J1 ) =


3 Pas. Jendela Kaca Ungkit 144 x 140 cm ( J2 ) =
4 Pas. Jendela Kaca Ungkit 222 x 140 cm ( J3 ) =
5 Pas. Ventilasi 70 x 140 cm ( V1 ) =
6 Pas. Ventilasi 30 x 100 cm ( V2 ) =
6 Pas. Pintu Panil Kayu ( 170 x 210 cm ) ( P1) =
7 Pas. Pintu Panil Kayu ( 80 x 210 cm ) ( P2) =
8 Pas. Pintu Panil Lapis Seng Lat Bagian Dalam ( 70 x 210 cm ) (P3) =

2 Volume Luasan Pintu, Jendela dan Ventilasi


Luasan Pintu (P1) = (1,7 x 2,1) =
Luasan Pintu (P2) = (0,8 x 2,1) =
Luasan Pintu (P3) = (0,7 x 2,1) =
Luasan Jendela ( J1) = (1,68 x 2) =
Luasan Jendela ( J2) = (1,40 x 2,22) =
Luasan Jendela (J3) = (1,14 x 1,40) =
Luasan Ventilasi (V1) = (0,7 x 1,14) =
Luasan Ventilasi (V2) = (1 x 0,30) =

IX. PEKERJAAN PENGECATAN

1 Cat Meny Kayu

Ukuran Kayu 5/10 cm


Ukuran Sisi Kayu 5/10 cm = 0,05 + 0,05 + 0,10 =
Volume Lisplank =
J1 = (1,68+1,68+1,68+2+2+2+2)x3 =
J2 = (1,40+1,40+1,40+1,40+1,40+2,22+2,22)x8 =
J3 = (1,14+1,14+1,40+1,40+1,40)x3 =
V1 = (0,7+0,7+1,14+1,14)x11 =
V2 = (1+1+0,30+0,30)X7 =
P1 = (1,7 + 2,1 + 2,1) x 1 =
P2 = (0,8 + 2,1 + 2,1) x 8 =
P3 = (0,7 + 2,1 + 2,1) x 10 =
Luasan Total Pintu, Jendela, Ventilasi dan Volume Lisplank Dijumlahkan (+)
=
Rumus =
Ukuran Sisi Kayu x Luasan Total P,J,V, Dan Volume Lisplank =

2 Cat Kilap Kayu


Cat Kilap Kayu Dihitung Ikut Cat Meny Kayu =

3 Cat Tembok Untuk Dinding


Cat Tembok Untuk Dinding Dihitung Ikut Volume Plesteran =

4 Cat Plafond

Luas Bangunan Lantai 1 = 126 m2


Luas Bangunan Lantai 2 = 122 m2
Luas B Lt 1 + Luas B Lt 2 = 248 m2

X. PEKEKERJAAN INSTALASI LISTRIK

1 Lampu XL 23 Watt = 23 Bh
2 Lampu XL 14 Watt = 10 Bh
3 Saklar Ganda = 6 Bh
4 Saklar Tunggal = 13 Bh
5 Stop Kontak = 12 Bh
6 Sekring Case = 1 Bh

XI. PEKEKERJAAN SANITASI

1 Bak air =
2 Pasangan Closet Jongkok Porcelin =
3 Septictank ukuran 1,25 x 1,5 x 1,5 m, Pas. 1/2 Bata =
4 Memasang Pipa PVC Tipe AW Dia. 3/4" =
5 Memasang Pipa PVC Tipe AW Dia. 4" =
6 Kran air Dia. 3/4" atau 1/2" =
7 Pompa dragon/pompa tangan =

Merauke, NOVEMBER 2020


Dibuat Oleh
Diperiksa Oleh ESTIMATOR

…....................... AGUS PUTRA LAKSONO


ASISTEN DOSEN 2018-22-201-003
EN )

78.5
47.5

M3

210 m2
0.71 m

M3
126 m
0.1 m
0.8 m
10.08 M3

134 m2
0.1 m

13.4 M3

3.46 M3

10.44 M3
78.5
55

36
64.5
122 m2 122
0.05 m
6.10 M3

26 m2
3.12 M3

70.5
46.5
59.5
41.5

1357.8 M2

152 m2
17.25 m2
6 m2
140.75 m2
122 m2
14.25 m2
8 m2
115.75 m2

256.5 m2
1.35 m2

m
m
m
m2

m
m
m2

m
m
m2

Dibagi 4 Dibulatkan
15.88 4.0 Bh
8.16 1.0 Bh
8.34 3.0 Bh
4.4 2.0 Bh
1.68 2.0 Bh
1.07 1.0 Bh
m2
m2
m2

M2

5.9 m
40 m
49 m
39.12 m
91.52 m
19.44 m
40.48 m
18.2 m
303.66 m:4
75.915 bh
1.5183 m3

3.00 Bh
8.00 Bh
3.00 Bh
11.00 Bh
7.00 Bh
1.00 Bh
8.00 Bh
10.00 Bh

3.57 m2
1.68 m2
1.47 m2
3.36 m2
3.11 m2
1.60 m2
0.80 m2
0.30 m2

0.2 m1
71.4 m1
39.12 m1
91.52 m
1

19.44 m1
40.48 m1
18.2 m1
5.9 m1
40 m1
49 m1
375.06 m2

75.012 M2

75.012 M2

1357.8 M2

10.00 Unit
10.00 Bh
2.00 Unit
18.00 M1
19.00 M1
10.00 BH
1.00 Unit

Merauke, NOVEMBER 2020


Dibuat Oleh
ESTIMATOR

AGUS PUTRA LAKSONO


2018-22-201-003
BEKAP DATA BESI TULANGAN

1 Pondasi Poer B. Bertulang

Tinggi P.Poerplat = 1.5 m


Panjang P.Poerplat ( begel ) = 0.3 m
Lebar P.Poerplat ( Begel ) = 0.3 m Beugel Ø 8 - 15
130
Banyaknya P.Poerplat = 24 Bh 4 Ø 16

Panjang P.Poerplat Bawah = 1 m 8 Ø 12

Lebar P.Poerplat Bawah = 1 m


Ø 12 -
Tebal P.Poerplat = 0.3 m Ø 12 -
10 Ø 12 -
a. Perhitungan Tinggi Pondasi Poerplat
15
Banyak Tulangan Ø12 = 8 Btg 5
5
Panjang Tulangan = 1.5 m 25
100
Banyak Pondasi Poerplat = 24 Bh 110

Rumus = ( Banyak Tulangan x Panjang Tulangan ) x Banyak Tulangan Pondasi Poerplat


= 288 m
b. Perhitungan Lebari Pondasi Poerplat
Panjang Besi P.Poerplat Bawah = 1 m
Lebar Besi P.Poerplat Bawah = 1 m
Tinggi Besi P.Poerplat Bawah = 0.3 m
Banyak Pondasi Poerplat = 24 Bh
Banyak Besi Tulangan Sisi Vertikal = 8 Btg
Rumus = ( Tinggi P.Poer + 2 x Panjang Pondasi Poer ) x Banyak Besi Tulangan
= 18.4 m
Rumus = 13,5 x 2 ( Sisi Horizontal ) = 36.8 m
Rumus = 27 x Banyak Lebar Pondasi Poer. = 883.2 m
Rumus = Volume Tinggi Pondasi Poerplat + Volume Lebar Bawah
= 1171.2 m
c. Perhitungan Begel Pondasi Poerplat
Rumus = Tinggi Pondasi Poerplat : 0,15 m
Panjang Tulangan = 1.5 m
= 10.0 Btg
Panjang P.Poerplat ( begel ) = 0.3 m
Lebar P.Poerplat ( Begel ) = 0.3 m
Banyak Tulangan Ø8 - 15 cm = 8 Btg
Rumus = ( ( Panjang Besi P.Poer + Lebar Besi P.Bert ) x 2) x Banyak Tulangan
= 9.6 m
Panjang Besi Ø12 = 12 m
Berat Per 1 Batang Besi = 7.40 kg
Berat Per 1 m Besi Ø12 = 0.617 kg
d. Total Berat Besi Tulangan Untuk Pondasi Poerplat
Rumus = Total Panjang Besi Tulangan x Berat Per 1 m Besi
= 722.24 kg
e. Total Berat Besi Tulangan Untuk Begel Pondasi Poerplat
Panjang Besi Ø8 = 12 m
Berat Per 1 Batang Besi = 4.74 kg
Berat Per 1 m Besi Ø12 = 0.395 kg
Rumus = Total Panjang Besi Tulangan x Berat Per 1 m Besi
= 3.792 kg

2 Sloof B.Bertulang 20 x 30 cm
Panjang Sloof = 0.30 m
Lebar Sloof = 0.20 m
Panjang Sloof Keliling = 126 m
a. Perhitungan Panjang Total Besi Ø12 Untuk Sloof
Banyak Besi Sloof Ø12 = 8 Btg
Rumus = Panjang Sloof Keliling x Banyak Besi
Total Panjang Besi = 1008 m
Total Panjang Per 1 Batang = 84 Btg
Panjang Besi Ø12 = 12 m
Berat Per 1 Batang Besi P. 12 m = 7.40 kg
Berat Per 1 m Besi Ø12 = 0.617 kg
Rumus = Total Panjang Besi Tulangan x Berat Per 1 m Besi
= 621.6 kg
b. Perhitungan Berat Total Besi Ø12 Untuk Sloof
Panjang Besi Ø12 = 12 m
Berat Per 1 Batang Besi P. 12 m = 7.40 kg
Berat Per 1 m Besi Ø12 = 0.617 kg
Rumus = Total Panjang Besi Tulangan x Berat Per 1 m Besi
= 1634.59 kg
c. Perhitungan Begel Sloof Besi Ø10 Untuk Sloof
Panjang Sloof Keliling = 0.3 m
Lebar Sloof = 0.2 m
Panjang Sloof Keliling = 126 Bh
Rumus = Panjang Sloof : 0,15 m = 840.00 Btg
Rumus = 443,33 x Banyak Begel Sloof = 105840.00 Btg
Rumus = ( Panjang Sloof + Lebar Sloof ) x 2
= 1 m
Rumus = P. Begel x Bany. Begel = 105840.0 m
Total Panjang Per 1 Batang = 8820.0 Btg
e. Total Berat Besi Tulangan Untuk Begel Sloof
Panjang Besi Ø8 = 12 m
Berat Per 1 Batang Besi P. 12 m = 4.74 kg
Berat Per 1 m Besi Ø12 = 0.395 kg
Rumus = Total Panjang Besi Tulangan x Berat Per 1 m Besi
= 41806.80 kg
3 Kolom Utama 15 x 25 B. Bertulang
Panjang Kolom = 0.25 m
Lebar Kolom = 0.15 m
Tinggi Kolom Kolom Total = 7 m
Banyak Besi Per 1 Kolom Ø12 = 8 Btg
a. Perhitungan Panjang Total Besi Ø12 Untuk Kolom Utama
Rumus = Tinggi Kolom x Banyak Besi Per 1 kolom
Total Panjang Total Per 1 kolom = 56 m
Banyak Kolom = 47 Bh
Rumus = Panjang Total Per 1 kolom x Banyak Kolom
= 2632 m
Total Panjang Per 1 Batang = 219.33 Btg
b. Perhitungan Berat Total Besi Ø12 Untuk Kolom Utama
Panjang Besi Ø12 = 12 m
Berat Per 1 Batang Besi P. 12 m = 7.40 kg
Berat Per 1 m Besi Ø12 = 0.617 kg
Rumus = Total Panjang Besi Tulangan x Berat Per 1 m Besi
= 1623.07 kg
c. Perhitungan Begel Kolom Besi Ø10 Untuk Kolom Utama
Panjang Kolom = 0.25 m
Lebar Kolom = 0.15 m
Tinggi Kolom Kolom Total = 7 m
Banyak Kolom = 47 Bh
Rumus = Tinggi Kolom : 15 cm = 46.67 Btg
Rumus = 53,33 x Banyak Begel Kolom = 2193.33 Btg
Rumus = ( Panjang Kolom + Lebar Kolom ) x 2
= 0.8 m
Rumus = P. Begel x Bany. Begel = 1754.7 m
Total Panjang Per 1 Batang = 146.2 Btg
e. Total Berat Besi Tulangan Untuk Begel Kolom Utama
Panjang Besi Ø8 = 12 m
Berat Per 1 Batang Besi P. 12 m = 4.74 kg
Berat Per 1 m Besi Ø12 = 0.395 kg
Rumus = Total Panjang Besi Tulangan x Berat Per 1 m Besi
= 693.09 kg

4 Kolom Praktis 15 x 15 B. Bertulang


Panjang Kolom Praktis = 0.15 m
Lebar Kolom Praktis = 0.15 m
Tinggi Kolom Lantai 1 = 4 m
Banyak Kolom Lantai 1 = 20 Bh
Banyak Besi Per 1 Kolom Ø12 = 8 Btg
a. Perhitungan Panjang Total Besi Ø12 Untuk Kolom Praktis
Rumus = Tinggi Kolom x Banyak Besi Per 1 kolom
Total Panjang Total Per 1 kolom = 32 m
Banyak Kolom = 20 Bh
Rumus = Panjang Total Per 1 kolom x Banyak Kolom
= 640 m
Total Panjang Per 1 Batang = 53.3333333 Btg
b. Perhitungan Berat Total Besi Ø12 Untuk Kolom
Panjang Besi Ø12 = 12 m
Berat Per 1 Batang Besi P. 12 m = 7.40 kg
Berat Per 1 m Besi Ø12 = 0.617 kg
Rumus = Total Panjang Besi Tulangan x Berat Per 1 m Besi
= 394.666667 kg
c. Perhitungan Begel Kolom Besi Ø10 Untuk Kolom Praktis
Panjang Kolom = 0.15 m
Lebar Kolom = 0.15 m
Tinggi Kolom Kolom Total = 7 m
Banyak Kolom = 20 Bh
Rumus = Tinggi Kolom : 15 cm = 46.67 Btg
Rumus = 28 x Banyak Begel Kolom = 933.33 Btg
Rumus = ( Panjang Kolom + Lebar Kolom ) x 2
= 0.6 m
Rumus = P. Begel x Bany. Begel = 560.0 m
Total Panjang Per 1 Batang = 46.7 Btg
e. Total Berat Besi Tulangan Untuk Begel Kolom Praktis
Panjang Besi Ø8 = 12 m
Berat Per 1 Batang Besi P. 12 m = 4.74 kg
Berat Per 1 m Besi Ø12 = 0.395 kg
Rumus = Total Panjang Besi Tulangan x Berat Per 1 m Besi
= 221.20 kg

5 Balok Utama 20 x 30 cm B. Bertulang


Panjang Balok Utama = 0.30 m
Lebar Balok Utama = 0.20 m
Panjang Keliling Balok Utama = 133.5 m
a. Perhitungan Panjang Total Besi Ø12 Untuk Balok Utama
Banyak Besi Sloof Ø12 = 8 Btg
Rumus = Panjang Balok Utama Keliling x Banyak Besi
Total Panjang Besi = 1068 m
Total Panjang Per 1 Batang = 89 Btg
Panjang Besi Ø12 = 12 m
Berat Per 1 Batang Besi P. 12 m = 7.40 kg
Berat Per 1 m Besi Ø12 = 0.617 kg
Rumus = Total Panjang Besi Tulangan x Berat Per 1 m Besi
= 658.6 kg
b. Perhitungan Berat Total Besi Ø12 Untuk Balok Utama
Panjang Besi Ø12 = 12 m
Berat Per 1 Batang Besi P. 12 m = 7.40 kg
Berat Per 1 m Besi Ø12 = 0.617 kg
Rumus = Total Panjang Besi Tulangan x Berat Per 1 m Besi
= 658.6 kg
c. Perhitungan Begel Balok Utama Besi Ø10 Untuk Balok Utama
Panjang Balok Utama = 0.30 m
Lebar Balok Utama = 0.20 m
Panjang Keliling Balok Utama = 133.5 m
Rumus = Panjang Balok Utama : 0,15 m = 890.00 Btg
Rumus = 446,67 x Banyak Begel Balok Utama = 5933.33 Btg
Rumus = ( Panjang BU + Lebar BU ) x 2
= 1 m
Rumus = P. Begel x Bany. Begel = 5933.3 m
Total Panjang Per 1 Batang = 494.4 Btg
e. Total Berat Besi Tulangan Untuk Begel Balok Utama
Panjang Besi Ø8 = 12 m
Berat Per 1 Batang Besi P. 12 m = 4.74 kg
Berat Per 1 m Besi Ø12 = 0.395 kg
Rumus = Total Panjang Besi Tulangan x Berat Per 1 m Besi
= 2343.67 kg
6 Ring Balk 20 x 30 cm B. Bertulang
Panjang Ringbalk = 0.30 m
Lebar Ringbalk = 0.20 m
Panjang Keliling Ringbalk = 100.5 m
a. Perhitungan Panjang Total Besi Ø12 Untuk Ringbalk
Banyak Besi Ringbalk Ø12 = 8 Btg
Rumus = Panjang Ringbalk Keliling x Banyak Besi
Total Panjang Besi = 804 m
Total Panjang Per 1 Batang = 67.00 Btg
Panjang Besi Ø12 = 12 m
Berat Per 1 Batang Besi P. 12 m = 7.40 kg
Berat Per 1 m Besi Ø12 = 0.617 kg
Rumus = Total Panjang Besi Tulangan x Berat Per 1 m Besi
= 495.80 kg
b. Perhitungan Berat Total Besi Ø12 Untuk Ringbalk
Panjang Besi Ø10 = 12 m
Berat Per 1 Batang Besi P. 12 m = 7.40 kg
Berat Per 1 m Besi Ø10 = 0.617 kg
Rumus = Total Panjang Besi Tulangan x Berat Per 1 m Besi
= 495.80 kg
c. Perhitungan Begel Balok Utama Besi Ø10 Untuk Ringbalk
Panjang Ringbalk = 0.30 m
Lebar Ringbalk = 0.20 m
Panjang Keliling Ringbalk = 100.5 m
Rumus = Panjang Ringbalk : 0,15 m = 670.00 Btg
Rumus = 446,67 x Banyak Begel Ringbalk = 4466.67 Btg
Rumus = ( Panjang RB + Lebar RB ) x 2
= 1 m
Rumus = P. Begel x Bany. Begel = 4466.7 m
Total Panjang Per 1 Batang = 372.2 Btg
e. Total Berat Besi Tulangan Untuk Begel Ringbalk
Panjang Besi Ø8 = 12 m
Berat Per 1 Batang Besi P. 12 m = 4.74 kg
Berat Per 1 m Besi Ø12 = 0.395 kg
Rumus = Total Panjang Besi Tulangan x Berat Per 1 m Besi
= 1764.33 kg

7 Cor Plat Lantai Tebal 5 cm


Type 1 bagian 1
Panjang Bngunan = 4 m
Lebar Bangunan = 2 m
Rumus = Panjang Bangunan : 0,15 m = 26.67 Btg
Rumus = Lebar Bangunan : 0,15 m = 13.3 Btg
Total Besi = 40.00 Btg
Type 2
Panjang Bngunan = 18 m
Lebar Bangunan = 6 m
Rumus = Panjang Bangunan : 0,15 m = 120.00 Btg
Rumus = Lebar Bangunan : 0,15 m = 40.0 Btg
Total Besi = 160.00 Btg
Total Besi Type 1 + Type 2 = 430.00 Btg

8 Cor Tangga Beton B. Bertulang


130 Beugel Ø 8 - 15

4 Ø 16

8 Ø 12

Ø 12 - 15
Ø 12 - 15
10 Ø 12 - 15

15
5
5
25
100
110

( Baru 1 sisi )
Type 1 bagian 2 Type 1 bagian 3
Panjang Bngunan = 3 m Panjang Bngunan
Lebar Bangunan = 2 m Lebar Bangunan
Rumus = Panjang Bangunan : = 20 Btg Rumus = Panjang Bangu
Rumus = Lebar Bangunan : 0 = 13.3 Btg Rumus = Lebar Banguna
Total Besi = 33.33 Btg Total Besi
Type 1 bagian 3 Type 1 bagian 4
anjang Bngunan = 18 m Panjang Bngunan =
ebar Bangunan = 6 m Lebar Bangunan =
Rumus = Panjang Banguna = 120 Btg Rumus = Panjang Banguna =
Rumus = Lebar Bangunan = 40.0 Btg Rumus = Lebar Bangunan =
= 160.00 Btg Total Besi =
4 m
1.5 m
26.6666667 Btg
10.0 Btg
36.67 Btg
No. URAIAN PEKERJAAN VOL. SAT. HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 = (3) x (5)

X. PEKEKERJAAN INSTALASI LISTRIK


1 Lampu XL 23 Watt 23.00 Ttk Rp. 221,957.00 Rp. 5,105,011.00
2 Lampu XL 14 Watt 10.00 Ttk Rp. 210,457.00 Rp. 2,104,570.00
3 Saklar Ganda 6.00 Ttk Rp. 331,764.00 Rp. 1,990,584.00
4 Saklar Tunggal 13.00 Ttk Rp. 324,944.00 Rp. 4,224,272.00
5 Stop Kontak 12.00 Ttk Rp. 141,228.00 Rp. 1,694,736.00
6 Sekring Case 1.00 Bh Rp. 19,131,305.00 Rp. 19,131,305.00
7 Biaya Penyambungan Listrik 1.00 Ls Rp. 5,000,000.00 Rp. 5,000,000.00
JUMLAH X Rp. 39,250,478.00
XI. PEKEKERJAAN SANITASI
1 Bak air 10.00 Unit Rp. 1,633,203.74 Rp. 16,332,037.40
2 Pasangan Closet Jongkok Porcelin 10.00 BH Rp. 1,130,975.50 Rp. 11,309,755.00
3 Septictank ukuran 1,5 x 2 x 1,5 m, Pas. 1/2 Bata 1PC : 3PS 2.00 Unit Rp. 9,289,928.88 Rp. 18,579,857.76
4 Memasang Pipa PVC Tipe AW Dia. 3/4" 18.00 M1 Rp. 69,978.30 Rp. 1,259,609.40
5 Memasang Pipa PVC Tipe AW Dia. 4" 19.00 M1 Rp. 139,174.45 Rp. 2,644,314.55
6 Kran air Dia. 3/4" atau 1/2" 10.00 BH Rp. 61,349.00 Rp. 613,490.00
7 Pompa dragon/pompa tangan 1.00 Unit Rp. 1,001,877.57 Rp. 1,001,877.57
JUMLAH XI Rp. 51,740,941.68
XII. PEKEKERJAAN FINISHING
1 Pembersihan Akhir 1.00 Ls Rp. 3,000,000.00 Rp. 3,000,000.00
JUMLAH XII Rp. 3,000,000.00

REKAPITULASI :
I. PEKERJAAN PERSIAPAN ………………….…………………………………… Rp. 51,771,582.78
II. PEKERJAAN TANAH DAN PASIR ………………….…………………………………… Rp. 91,870,562.68
III. PEKERJAAN PONDASI DAN BETON ………………….…………………………………… Rp. 575,111,641.56
IV. PEKERJAAN PASANGAN DAN PLESTERAN ………………….…………………………………… Rp. 201,770,649.48
V. PEKERJAAN LANTAI DAN DINDING ………………….…………………………………… Rp. 115,808,864.60
VI. PEKERJAAN ATAP ………………….…………………………………… Rp. 62,668,719.43
VII. PEKERJAAN PLAFOND ………………….…………………………………… Rp. 50,557,029.52
VIII. PEKERJAAN KUSEN PINTU DAN JENDELA ………………….…………………………………… Rp. 25,573,797.63
IX. PEKERJAAN PENGECATAN ………………….…………………………………… Rp. 47,996,791.08
X. PEKEKERJAAN INSTALASI LISTRIK ………………….…………………………………… Rp. 39,250,478.00
XI. PEKEKERJAAN SANITASI ………………….…………………………………… Rp. 51,740,941.68
XII. PEKEKERJAAN FINISHING ………………….…………………………………… Rp. 3,000,000.00

TOTAL ………………….…………………………………… Rp. 1,317,121,058.43


PPN 10 % ………………….…………………………………… Rp. 131,712,105.84
JUMLAH ………………….…………………………………… Rp. 1,448,833,164.27
DIBULATKAN ………………….…………………………………… Rp. 1,448,830,000.00

BIAYA FISIK ………………….…………………………………… Rp. 1,448,830,000.00

BIAYA PERENCANAAN ………………….…………………………………… Rp. 79,685,650.00

BIAYA PENGAWASAN ………………….…………………………………… Rp. 57,953,200.00

BIAYA PENGELOLA ………………….…………………………………… Rp. 36,220,750.00

JUMLAH ………………….…………………………………… Rp. 1,622,689,600.00


DIBULATKAN ………………….…………………………………… Rp. 1,622,680,000.00

Terbilang : ' Dua Miliar Dua Puluh Satu Juta Empat Ratus Enam Puluh Ribu Rupiah,-"

Merauke, NOVEMBER 2020


Dibuat Oleh
Diperiksa Oleh ESTIMATOR

….................... AGUS PUTRA LAKSONO


ASISTEN DOSEN 2018-22-201-003
RENCANA ANGGARAN BIAYA ( RAB )
TUGAS BESAR : MENEJEMEN KONTRUKSI DAN ESTIMASI BIAYA
DIBUAT OLEH : AGUS PUTRA LAKSONO
NPM : 2018-22-201-003
JURUSAN : TEKNIK SIPIL
DIPERIKSA OLEH :
DISETUJUI OLEH : YANCE KAKERISSA,S.T.,M.,T

No. URAIAN PEKERJAAN VOL. SAT. HARGA SATUAN JUMLAH HARGA

1 2 3 4 5 6 = (3) x (5)

I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 375.00 M2 Rp. 16,265.00 Rp. 6,099,375.00
2 Pemasangan Papan Nama Proyek 1.00 Ls Rp. 1,000,000.00 Rp. 1,000,000.00
3 Gudang Semen dan Peralatan 28.00 M2 Rp. 1,442,978.79 Rp. 40,403,406.12
4 Pengukuran dan Pemasangan Bouwplank 45.75 M1 Rp. 93,307.14 Rp. 4,268,801.66
JUMLAH I Rp. 51,771,582.78

II. PEKERJAAN TANAH DAN PASIR


1 Galian Tanah Pondasi 43.78 M3 Rp. 146,385.00 Rp. 6,408,149.76
2 Urugan Tanah Kembali 14.59 M3 Rp. 56,113.33 Rp. 818,805.76
3 Urugan Tanah Peninggian Lantai 149.10 M3 Rp. 397,534.00 Rp. 59,272,319.40
4 Urugan Pasir Bawah Pondasi 13.54 M3 Rp. 941,910.00 Rp. 12,749,693.76
5 Urugan Pasir Bawah Lantai ` 13.40 M3 Rp. 941,910.00 Rp. 12,621,594.00
JUMLAH II Rp. 91,870,562.68

III. PEKERJAAN PONDASI DAN BETON


1 Lantai Kerja Tebal 10 cm 3.456 M3 Rp. 2,598,054.69 Rp. 8,978,877.01
2 Pondasi Poer B. Bertulang 10.440 M3 Rp. 6,102,940.32 Rp. 63,714,696.94
3 Pas. Pondasi Batu Bata 41.895 M3 Rp. 2,750,371.30 Rp. 115,226,805.80
4 Sloof B.Bertulang 20 x 30 cm 7.560 M3 Rp. 7,111,815.42 Rp. 53,765,324.58
5 Kolom Utama 15 x 25 B. Bertulang 6.188 M3 Rp. 11,695,533.52 Rp. 72,366,113.66
6 Kolom Praktis 15 x 15 B. Bertulang 2.543 M3 Rp. 8,331,364.15 Rp. 21,182,493.35
7 Balok Utama 20 x 30 cm B. Bertulang 8.010 M3 Rp. 9,503,948.62 Rp. 76,126,628.45
8 Ring Balk 20 x 30 cm B. Bertulang 6.030 M3 Rp. 9,445,568.62 Rp. 56,956,778.78
9 Cor Plat Lantai Tebal 5 cm 6.10 M3 Rp. 8,714,503.12 Rp. 53,158,469.03
10 Cor Tangga Beton B. Bertulang 3.02 M3 Rp. 8,790,612.91 Rp. 26,582,813.44
11 Cor Plat Dak Tebal 12 cm 3.12 M3 Rp. 8,670,718.12 Rp. 27,052,640.53
JUMLAH III Rp. 575,111,641.56
IV. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Dinding 1/2 Bata 67.89 M3 Rp. 296,935.79 Rp. 20,158,257.95
2 Plesteran Tebal 20 mm 1357.75 M2 Rp. 114,113.11 Rp. 154,937,308.76
3 Cor Lantai, Tebal : 5 cm 6.10 M3 Rp. 4,372,964.39 Rp. 26,675,082.77
JUMLAH IV Rp. 201,770,649.48
V. PEKERJAAN LANTAI DAN DINDING
1 Pas. Lantai Keramik Uk. 60 x 60 cm 256.50 M2 Rp. 349,188.75 Rp. 89,566,914.38
2 Pas. Lantai Keramik Tangga Uk. 30 x 30 cm 5.08 M2 Rp. 336,116.49 Rp. 1,707,471.77
3 Pas. Lantai Keramik KM/WC Uk. 20 x 20 cm 17.25 M2 Rp. 334,344.03 Rp. 5,767,434.52
4 Pas. Dinding Keramik KM/WC Uk. 20 x 20 cm, tinggi : 1,2 m 51.17 M2 Rp. 366,773.06 Rp. 18,767,043.93
JUMLAH V Rp. 115,808,864.60

VI. PEKERJAAN ATAP


1 Pas. Rangka Kuda-kuda & Skor 5/8 cm (Kayu Klas II ) 2.68 M3 Rp. 7,935,530.60 Rp. 21,267,222.01
2 Pas. Gording 5/8 cm ( Kayu Klas II ) 2.50 M3 Rp. 6,592,593.00 Rp. 16,474,889.91
3 Pas. Atap Seng Gelombang BJLS 0.20 mm 294.53 M2 Rp. 70,532.00 Rp. 20,773,437.30
4 Pas. Lisplank Kayu Kelas II 71.40 M1 Rp. 58,167.65 Rp. 4,153,170.21
JUMLAH VI Rp. 62,668,719.43
VII. PEKERJAAN PLAFOND
1 Pas. Rangka Plafond Kayu 5/5 cm 248.00 M2 Rp. 142,330.57 Rp. 35,297,981.36
2 Pas. Plafond Gypsum t : 9 mm 248.00 M2 Rp. 61,528.42 Rp. 15,259,048.16
JUMLAH VII Rp. 50,557,029.52
VIII. PEKERJAAN KUSEN PINTU DAN JENDELA
1 Pas. Kusen Pintu Dan Jendela 1.52 M3 Rp. 9,922,530.00 Rp. 15,065,377.30
2 Luasan Jendela ( J1) 3.36 M2 Rp. 462,466.84 Rp. 1,553,888.58
3 Luasan Jendela ( J2) 3.11 M2 Rp. 462,466.84 Rp. 1,437,346.94
4 Luasan Jendela (J3) 1.60 M2 Rp. 462,466.84 Rp. 738,097.08
5 Luasan Ventilasi (V1) 0.80 M2 Rp. 70,148.83 Rp. 55,978.77
6 Luasan Ventilasi (V2) 0.30 M2 Rp. 70,148.83 Rp. 21,044.65
7 Luasan Pintu (P1) 3.57 M2 Rp. 997,331.00 Rp. 3,560,471.67
8 Luasan Pintu (P2) 1.68 M2 Rp. 997,331.00 Rp. 1,675,516.08
9 Luasan Pintu (P3) 1.47 Bh Rp. 997,331.00 Rp. 1,466,076.57
JUMLAH VIII Rp. 25,573,797.63
IX. PEKERJAAN PENGECATAN
1 Cat Meny Kayu 75.01 M2 Rp. 34,628.06 Rp. 2,597,520.04
2 Cat Kilap Kayu 75.01 M2 Rp. 43,306.45 Rp. 3,248,503.43
3 Cat Tembok untuk Dinding 1357.75 M2 Rp. 24,675.26 Rp. 33,502,883.62
4 Cat Plafon 248.00 M2 Rp. 34,870.50 Rp. 8,647,884.00
JUMLAH IX Rp. 47,996,791.08
PEKERJAAN : PEMBUATAN JALAN PAVING PANJANG 85 M' BPPMHP MERAUKE
LOKASI : JALAN NOWARI - MERAUKE
TAHUN ANGGARAN : 2013

NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN JUMLAH HARGA

1 2 3 4 5 6=(3x5)

I. PEKERJAAN PERSIAPAN
1 Pembuatan Barak Kerja Ls Rp. 15,000,000.00 Rp. 0.00
2 Pengukuran dan Pasang Bouwplank 172.400 M1 Rp. #REF! Rp. #REF!
3 Administrasi dan Dokumentasi 1.000 Ls Rp. 4,500,000.00 Rp. 4,500,000.00
JUMLAH I Rp. #REF!
II. PEKERJAAN TANAH DAN PASIR
1 Galian Tanah Manual 5.950 M3 Rp. #REF! Rp. #REF!
2 Urugan Tanah Pilihan 23.760 M3 Rp. #REF! Rp. #REF!
3 Urugan Pasir Bawah Pasangan 2.975 M3 Rp. #REF! Rp. #REF!
4 Urugan Pasir Bawah Paving Block 5.100 M3 Rp. #REF! Rp. #REF!
JUMLAH II Rp. #REF!
III. PEKERJAAN PASANGAN
1 Pas. Pondasi Batu Bata 1 pc : 3 ps 6.375 M3 Rp. #REF! Rp. #REF!
2 Cor Dinding Pondasi 1 pc : 3 ps 8.925 M3 Rp. #REF! Rp. #REF!
3 Pasang Paving Block 102.000 M2 Rp. #REF! Rp. #REF!
JUMLAH III Rp. #REF!

REKAPITULASI :
I. PEKERJAAN PERSIAPAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp. #REF!
II. PEKERJAAN TANAH DAN PASIR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp. #REF!
III. PEKERJAAN PASANGAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp. #REF!

REAL COST ( RC ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp. #REF!


PPN 10% . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp. #REF!
JUMLAH . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp. #REF!
DIBULATKAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp. #REF!

Terbilang : " Seratus Sembilan Belas Juta Delapan Ratus Ribu Rupiah,-"

Merauke, NOVEMBER 2020

#REF!
#REF!

#REF!
#REF!
ANALISA HARGA SATUAN

HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA
SATUAN HARGA
1 2 3 4 5 = (3) x (4)

I. PEKERJAAN PERSIAPAN

1 1 M2 Membersihkan Lapangan dan Perataan

Pekerja OH 0.1000 Rp. 152,000.00 Rp. 15,200.00


Mandor OH 0.0050 Rp. 213,000.00 Rp. 1,065.00
JUMLAH Rp. 16,265.00
3 1 M2Gudang Semen dan Peralatan

Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas 3 Btg 1.7000 Rp. 17,020.00 Rp. 28,934.00
Balok Kayu Bus M3 0.2100 Rp. 2,905,260.00 Rp. 610,104.60
Paku Biasa Campur 2" - 5" KG 0.3000 Rp. 20,976.00 Rp. 6,292.80
Semen Portland (PC) @ 50 Kg KG 10.5000 Rp. 2,064.00 Rp. 21,672.00
Pasir Semen (import) M3 0.0300 Rp. 1,158,663.00 Rp. 34,759.89
Kerikil/batu pecah (import) M3 0.0500 Rp. 1,162,560.00 Rp. 58,128.00
Seng Gelombang BJLS 0,20 Lbr 1.5000 Rp. 53,450.00 Rp. 80,175.00
Seng Plat BJLS 0.20 Lbr 0.2500 Rp. 47,450.00 Rp. 11,862.50
Pekerja OH 1.0000 Rp. 152,000.00 Rp. 152,000.00
Tukang kayu OH 2.0000 Rp. 194,000.00 Rp. 388,000.00
Kepala Tukang OH 0.2000 Rp. 202,000.00 Rp. 40,400.00
Mandor OH 0.0500 Rp. 213,000.00 Rp. 10,650.00
JUMLAH Rp. 1,442,978.79

4 1 M' Pengukuran dan Bouwplank

Balok Kayu Bus ( Kayu kelas II I) M3 0.0120 Rp. 2,905,260.00 Rp. 34,863.12
Kayu Papan Bus ( Kayu kelas III ) M3 0.0070 Rp. 2,905,260.00 Rp. 20,336.82
Paku Biasa Campur 2" - 5" KG 0.0200 Rp. 21,110.00 Rp. 422.20
Pekerja kayu OH 0.1000 Rp. 152,000.00 Rp. 15,200.00
Tukang kayu OH 0.1000 Rp. 194,000.00 Rp. 19,400.00
Kepala Tukang Kayu OH 0.0100 Rp. 202,000.00 Rp. 2,020.00
Mandor OH 0.0050 Rp. 213,000.00 Rp. 1,065.00
JUMLAH Rp. 93,307.14

II. PEKERJAAN TANAH DAN PASIR

1 1 M3 Galian Tanah Biasa Sedalam 1 - 2 M


Pekerja OH 0.9000 Rp. 152,000.00 Rp. 136,800.00
Mandor OH 0.0450 Rp. 213,000.00 Rp. 9,585.00
JUMLAH Rp. 146,385.00

2 1 M3 Urug Kembali Tanah Biasa Sedalam 1 - 2 M


Dihitung 1/3 kali Galian Tanah Sedalam 1 - 2 M M3 0.3333 Rp. 168,340.00 Rp. 56,113.33
JUMLAH Rp. 56,113.33

3 1 M3 Urugan Tanah Urug (material didatangkan)

Tanah timbun biasa/urug Untuk Pemadatan per 20 cm M3 1.2000 Rp. 259,070.00 Rp. 310,884.00
Pekerja OH 0.5000 Rp. 152,000.00 Rp. 76,000.00
Mandor OH 0.0500 Rp. 213,000.00 Rp. 10,650.00
JUMLAH Rp. 397,534.00
HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA
SATUAN HARGA
1 2 3 4 5 = (3) x (4)
4 1 M3 Urugan Pasir Bawah Pondasi/Lantai/Konstruksi

Pasir semen (lokal) M3 1.2000 Rp. 745,150.00 Rp. 894,180.00


Pekerja OH 0.3000 Rp. 152,000.00 Rp. 45,600.00
Mandor OH 0.0100 Rp. 213,000.00 Rp. 2,130.00
JUMLAH Rp. 941,910.00

5 1 M3 Urugan Pasir Bawah Lantai

Pasir semen (lokal) M3 1.2000 Rp. 745,150.00 Rp. 894,180.00


Pekerja OH 0.3000 Rp. 152,000.00 Rp. 45,600.00
Mandor OH 0.0100 Rp. 213,000.00 Rp. 2,130.00
JUMLAH Rp. 941,910.00

III. PEKERJAAN PONDASI BETON DAN PASANGAN

1 1 M3 Lantai Keraja
Beton mutu f’'c = 21,7 MPa (K 250)
Slump (12 ± 2) cm, w/c = 0,56

Semen Portland (PC) @ 50 Kg KG 384.0000 Rp. 2,064.00 Rp. 792,576.00


Pasir semen (import) M3 0.4943 Rp. 1,158,663.00 Rp. 572,710.57
Kerikil/batu pecah (import) M3 0.7696 Rp. 1,162,560.00 Rp. 894,740.62
Air Liter 215.0000 Rp. 50.00 Rp. 10,750.00
Pekerja pasir/batu OH 1.6500 Rp. 152,000.00 Rp. 250,800.00
Tukang pasir/batu OH 0.2750 Rp. 194,000.00 Rp. 53,350.00
Kepala tukang pasir/batu OH 0.0275 Rp. 202,000.00 Rp. 5,555.00
Mandor pasir/batu OH 0.0825 Rp. 213,000.00 Rp. 17,572.50
JUMLAH Rp. 2,598,054.69

2 1 M3 Pondasi beton bertulang (150 kg besi + bekisting)

Kayu Bekisting Kelas 3 M3 0.2000 Rp. 2,095,260.00 Rp. 419,052.00


Paku Campur Biasa KG 1.5000 Rp. 20,976.00 Rp. 31,464.00
Minyak Bekisting Liter 0.4000 Rp. 907.00 Rp. 362.80
Besi tulangan beton dia. 12 mm KG 157.0000 Rp. 12,168.00 Rp. 1,910,376.00
Kawat ikat besi beton KG 2.2500 Rp. 25,250.00 Rp. 56,812.50
Semen Portland (PC) @ 50 Kg KG 336.0000 Rp. 2,063.40 Rp. 693,302.40
Pasir semen (import) M3 0.5400 Rp. 1,158,663.00 Rp. 625,678.02
Kerikil/batu pecah (import) M3 0.8100 Rp. 1,162,560.00 Rp. 941,673.60
Pekerja OH 5.3000 Rp. 152,000.00 Rp. 805,600.00
Tukang Batu OH 0.2750 Rp. 194,000.00 Rp. 53,350.00
Tukang Kayu OH 1.3000 Rp. 194,000.00 Rp. 252,200.00
Tukang Besi OH 1.0500 Rp. 194,000.00 Rp. 203,700.00
Kepala Tukang OH 0.2620 Rp. 202,000.00 Rp. 52,924.00
Mandor OH 0.2650 Rp. 213,000.00 Rp. 56,445.00
JUMLAH Rp. 6,102,940.32
3 1 M3 Pasangan Pondasi Bata
Pasangan Bata, Camp. 1PC : 2PS - Pasir Import (Manual)

Batu bata Buah 649.0000 Rp. 1,350.00 Rp. 876,150.00


Semen Portland (PC) @ 50 Kg Zak 5.7737 Rp. 103,170.00 Rp. 595,669.02
Pasir semen (import) M3 0.4124 Rp. 1,158,663.00 Rp. 477,838.00
Mandor pasir/batu OH 0.1429 Rp. 213,000.00 Rp. 30,428.57
Kepala tukang pasir/batu OH 0.4286 Rp. 202,000.00 Rp. 86,571.43
Tukang pasir/batu OH 1.2857 Rp. 194,000.00 Rp. 249,428.57
Pekerja pasir/batu OH 2.8571 Rp. 152,000.00 Rp. 434,285.71
JUMLAH Rp. 2,750,371.30
HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA
SATUAN HARGA
1 2 3 4 5 = (3) x (4)

4 1 M3 Sloof beton bertulang (200 kg besi + bekisting)

Kayu Bekisting Kelas 3 M3 0.2700 Rp. 2,095,260.00 Rp. 565,720.20


Paku Campur Biasa KG 2.0000 Rp. 20,976.00 Rp. 41,952.00
Minyak Bekisting Liter 0.6000 Rp. 907.00 Rp. 544.20
Besi tulangan beton dia. 12 mm KG 210.0000 Rp. 12,168.00 Rp. 2,555,280.00
Kawat ikat besi beton KG 3.0000 Rp. 25,250.00 Rp. 75,750.00
Semen Portland (PC) @ 50 Kg KG 336.0000 Rp. 2,063.40 Rp. 693,302.40
Pasir semen (import) M3 0.5400 Rp. 1,158,663.00 Rp. 625,678.02
Kerikil/batu pecah (import) M3 0.8100 Rp. 1,162,560.00 Rp. 941,673.60
Pekerja OH 5.6500 Rp. 152,000.00 Rp. 858,800.00
Tukang Batu OH 0.2750 Rp. 194,000.00 Rp. 53,350.00
Tukang Kayu OH 1.56 Rp. 194,000.00 Rp. 302,640.00
Tukang Besi OH 1.4000 Rp. 194,000.00 Rp. 271,600.00
Kepala Tukang OH 0.3230 Rp. 202,000.00 Rp. 65,246.00
Mandor OH 0.2830 Rp. 213,000.00 Rp. 60,279.00
JUMLAH Rp. 7,111,815.42

5 1 M3 Kolom beton bertulang (300 kg besi + bekisting)

Kayu Bekisting Kelas 3 M3 0.4000 Rp. 2,095,260.00 Rp. 838,104.00


Paku Campur Biasa KG 4.0000 Rp. 20,976.00 Rp. 83,904.00
Minyak Bekisting Liter 2.0000 Rp. 907.00 Rp. 1,814.00
Besi tulangan beton dia. 12 mm KG 315.0000 Rp. 12,168.00 Rp. 3,832,920.00
Kawat ikat besi beton KG 4.5000 Rp. 25,250.00 Rp. 113,625.00
Semen Portland (PC) @ 50 Kg KG 336.0000 Rp. 2,063.40 Rp. 693,302.40
Pasir semen (import) M3 0.5400 Rp. 1,158,663.00 Rp. 625,678.02
Kerikil/batu pecah (import) M3 0.8100 Rp. 1,162,560.00 Rp. 941,673.60
Balok Kayu Kelas 2 M3 0.1500 Rp. 4,179,150.00 Rp. 626,872.50
Plywood 9 mm Lbr 3.5000 Rp. 453,770.00 Rp. 1,588,195.00
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas 3 Btg 20.0000 Rp. 17,020.00 Rp. 340,400.00
Pekerja OH 7.0500 Rp. 152,000.00 Rp. 1,071,600.00
Tukang Batu OH 0.2750 Rp. 194,000.00 Rp. 53,350.00
Tukang Kayu OH 1.6500 Rp. 194,000.00 Rp. 320,100.00
Tukang Besi OH 2.1000 Rp. 194,000.00 Rp. 407,400.00
Kepala Tukang OH 0.4030 Rp. 202,000.00 Rp. 81,406.00
Mandor OH 0.3530 Rp. 213,000.00 Rp. 75,189.00
JUMLAH Rp. 11,695,533.52
6 1 M3 Kolom 15 x 15 (1PC : 3PS) - Pasir Import
Analisa per 1 M3 Kolom

Begisting beton (kolom) LS 1.0000 Rp. 2,000,000.00 Rp. 2,000,000.00


Tulangan Sengkang (polos) Dia. 8 mm KG 65.9935 Rp. 11,890.00 Rp. 784,662.17
Tulangan Utama (polos) Dia. 10 mm KG 109.9349 Rp. 11,890.00 Rp. 1,307,125.97
Campuran Beton 1PC : 3PS (import) M3 1.1000 Rp. 3,854,160.00 Rp. 4,239,576.00
JUMLAH Rp. 8,331,364.15

HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA
SATUAN HARGA
1 2 3 4 5 = (3) x (4)
7 1 M3 Balok beton bertulang (200 kg besi + bekisting)
Kayu Bekisting Kelas 3 M3 0.3200 Rp. 2,095,260.00 Rp. 670,483.20
Paku Campur Biasa KG 3.2000 Rp. 20,976.00 Rp. 67,123.20
Minyak Bekisting Liter 1.6000 Rp. 907.00 Rp. 1,451.20
Besi tulangan beton dia. 12 mm KG 210.0000 Rp. 12,168.00 Rp. 2,555,280.00
Kawat ikat besi beton KG 3.0000 Rp. 25,250.00 Rp. 75,750.00
Semen Portland (PC) @ 50 Kg KG 336.0000 Rp. 2,063.40 Rp. 693,302.40
Pasir semen (import) M3 0.5400 Rp. 1,158,663.00 Rp. 625,678.02
Kerikil/batu pecah (import) M3 0.8100 Rp. 1,162,560.00 Rp. 941,673.60
Balok Kayu Kelas 2 M3 0.1400 Rp. 4,179,150.00 Rp. 585,081.00
Plywood 9 mm Lbr 2.8000 Rp. 453,770.00 Rp. 1,270,556.00
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas 3 Btg 16.0000 Rp. 17,020.00 Rp. 272,320.00
Pekerja OH 6.3500 Rp. 152,000.00 Rp. 965,200.00
Tukang Batu OH 0.2750 Rp. 194,000.00 Rp. 53,350.00
Tukang Kayu OH 1.6500 Rp. 194,000.00 Rp. 320,100.00
Tukang Besi OH 1.4000 Rp. 194,000.00 Rp. 271,600.00
Kepala Tukang OH 0.3330 Rp. 202,000.00 Rp. 67,266.00
Mandor OH 0.3180 Rp. 213,000.00 Rp. 67,734.00
JUMLAH Rp. 9,503,948.62
8 1 M3 Ringbalk beton bertulang (200 kg besi + bekisting)
Kayu Bekisting Kelas 3 M3 0.3200 Rp. 2,095,260.00 Rp. 670,483.20
Paku Campur Biasa KG 3.2000 Rp. 20,976.00 Rp. 67,123.20
Minyak Bekisting Liter 1.6000 Rp. 907.00 Rp. 1,451.20
Besi tulangan beton dia. 10 mm KG 210.0000 Rp. 11,890.00 Rp. 2,496,900.00
Kawat ikat besi beton KG 3.0000 Rp. 25,250.00 Rp. 75,750.00
Semen Portland (PC) @ 50 Kg KG 336.0000 Rp. 2,063.40 Rp. 693,302.40
Pasir semen (import) M3 0.5400 Rp. 1,158,663.00 Rp. 625,678.02
Kerikil/batu pecah (import) M3 0.8100 Rp. 1,162,560.00 Rp. 941,673.60
Balok Kayu Kelas 2 M3 0.1400 Rp. 4,179,150.00 Rp. 585,081.00
Plywood 9 mm Lbr 2.8000 Rp. 453,770.00 Rp. 1,270,556.00
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas 3 Btg 16.0000 Rp. 17,020.00 Rp. 272,320.00
Pekerja OH 6.3500 Rp. 152,000.00 Rp. 965,200.00
Tukang Batu OH 0.2750 Rp. 194,000.00 Rp. 53,350.00
Tukang Kayu OH 1.6500 Rp. 194,000.00 Rp. 320,100.00
Tukang Besi OH 1.4000 Rp. 194,000.00 Rp. 271,600.00
Kepala Tukang OH 0.3330 Rp. 202,000.00 Rp. 67,266.00
Mandor OH 0.3180 Rp. 213,000.00 Rp. 67,734.00
JUMLAH Rp. 9,445,568.62
9 1 M3 Plat beton bertulang (150 kg besi + bekisting)
Kayu Bekisting Kelas 3 M3 0.3200 Rp. 2,095,260.00 Rp. 670,483.20
Paku Campur Biasa KG 3.2000 Rp. 20,976.00 Rp. 67,123.20
Minyak Bekisting Liter 1.6000 Rp. 907.00 Rp. 1,451.20
Besi tulangan beton dia. 12 mm KG 157.5000 Rp. 12,168.00 Rp. 1,916,460.00
Kawat ikat besi beton KG 2.2500 Rp. 25,250.00 Rp. 56,812.50
Semen Portland (PC) @ 50 Kg KG 336.0000 Rp. 2,063.40 Rp. 693,302.40
Pasir semen (import) M3 0.5400 Rp. 1,158,663.00 Rp. 625,678.02
Kerikil/batu pecah (import) M3 0.8100 Rp. 1,162,560.00 Rp. 941,673.60
Balok Kayu Kelas 2 M3 0.1200 Rp. 4,179,150.00 Rp. 501,498.00
Plywood 9 mm Lbr 2.8000 Rp. 453,770.00 Rp. 1,270,556.00
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas 3 Btg 32.0000 Rp. 17,020.00 Rp. 544,640.00
Pekerja OH 5.3000 Rp. 152,000.00 Rp. 805,600.00
Tukang Batu OH 0.2750 Rp. 194,000.00 Rp. 53,350.00
Tukang Kayu OH 1.3000 Rp. 194,000.00 Rp. 252,200.00
Tukang Besi OH 1.0500 Rp. 194,000.00 Rp. 203,700.00
Kepala Tukang OH 0.2650 Rp. 202,000.00 Rp. 53,530.00
Mandor OH 0.2650 Rp. 213,000.00 Rp. 56,445.00
JUMLAH Rp. 8,714,503.12
HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA
SATUAN HARGA
1 2 3 4 5 = (3) x (4)
10 1 M3 Tangga beton bertulang (150 kg besi + bekisting)
Kayu Bekisting Kelas 3 M3 0.2500 Rp. 2,095,260.00 Rp. 523,815.00
Paku Campur Biasa KG 3.0000 Rp. 20,976.00 Rp. 62,928.00
Minyak Bekisting Liter 1.2000 Rp. 907.00 Rp. 1,088.40
Besi tulangan beton dia. 10 mm KG 200.0000 Rp. 11,890.00 Rp. 2,378,000.00
Kawat ikat besi beton KG 3.0000 Rp. 25,250.00 Rp. 75,750.00
Semen Portland (PC) @ 50 Kg KG 323.0000 Rp. 2,063.40 Rp. 666,478.20
Pasir semen (import) M3 0.5200 Rp. 1,158,663.00 Rp. 602,504.76
Kerikil/batu pecah (import) M3 0.7800 Rp. 1,162,560.00 Rp. 906,796.80
Balok Kayu Kelas 2 M3 0.1050 Rp. 4,179,150.00 Rp. 438,810.75
Plywood 9 mm Lbr 2.5000 Rp. 453,770.00 Rp. 1,134,425.00
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas 3 Btg 14.0000 Rp. 17,020.00 Rp. 238,280.00
Pekerja OH 5.6000 Rp. 152,000.00 Rp. 851,200.00
Tukang Batu OH 0.3500 Rp. 194,000.00 Rp. 67,900.00
Tukang Kayu OH 2.3000 Rp. 194,000.00 Rp. 446,200.00
Tukang Besi OH 1.4000 Rp. 194,000.00 Rp. 271,600.00
Kepala Tukang OH 0.4050 Rp. 202,000.00 Rp. 81,810.00
Mandor OH 0.2020 Rp. 213,000.00 Rp. 43,026.00
JUMLAH Rp. 8,790,612.91
11 1 M3 Plat beton bertulang (150 kg besi + bekisting)
Kayu Bekisting Kelas 3 M3 0.3200 Rp. 2,095,260.00 Rp. 670,483.20
Paku Campur Biasa KG 3.2000 Rp. 20,976.00 Rp. 67,123.20
Minyak Bekisting Liter 1.6000 Rp. 907.00 Rp. 1,451.20
Besi tulangan beton dia. 10 mm KG 157.5000 Rp. 11,890.00 Rp. 1,872,675.00
Kawat ikat besi beton KG 2.2500 Rp. 25,250.00 Rp. 56,812.50
Semen Portland (PC) @ 50 Kg KG 336.0000 Rp. 2,063.40 Rp. 693,302.40
Pasir semen (import) M3 0.5400 Rp. 1,158,663.00 Rp. 625,678.02
Kerikil/batu pecah (import) M3 0.8100 Rp. 1,162,560.00 Rp. 941,673.60
Balok Kayu Kelas 2 M3 0.1200 Rp. 4,179,150.00 Rp. 501,498.00
Plywood 9 mm Lbr 2.8000 Rp. 453,770.00 Rp. 1,270,556.00
Kayu dolken Ø 8-10, Panjang 400 cm - Kayu Kelas 3 Btg 32.0000 Rp. 17,020.00 Rp. 544,640.00
Pekerja OH 5.3000 Rp. 152,000.00 Rp. 805,600.00
Tukang Batu OH 0.2750 Rp. 194,000.00 Rp. 53,350.00
Tukang Kayu OH 1.3000 Rp. 194,000.00 Rp. 252,200.00
Tukang Besi OH 1.0500 Rp. 194,000.00 Rp. 203,700.00
Kepala Tukang OH 0.2650 Rp. 202,000.00 Rp. 53,530.00
Mandor OH 0.2650 Rp. 213,000.00 Rp. 56,445.00
JUMLAH Rp. 8,670,718.12

IV. PEKERJAAN PASANGAN DAN PLESTERAN


1 1 M3 Pasangan Dinding 1/2 Bata
Pasangan Bata, Camp. 1PC : 3PS - Pasir Import (Manual)
Batu bata Buah 70.0000 Rp. 1,350.00Rp. 94,500.00
Semen Portland (PC) @ 50 Kg Zak 0.4625 Rp. 103,170.00Rp. 47,711.35
Pasir semen (import) M3 0.0495 Rp. 1,158,663.00Rp. 57,410.15
Mandor pasir/batu OH 0.2857 Rp. 213,000.00Rp. 60,857.14
Kepala tukang pasir/batu OH 0.1286 Rp. 202,000.00Rp. 25,971.43
Tukang pasir/batu OH 0.0429 Rp. 194,000.00 Rp. 8,314.29
Pekerja pasir/batu OH 0.0143 Rp. 152,000.00 Rp. 2,171.43
JUMLAH Rp. 296,935.79
2 1 M2 Plesteran 1PC : 3PS, Tebal 15 mm - Pasir Lokal
Semen Portland (PC) @ 50 Kg KG 7.7760 Rp. 2,064.00 Rp. 16,049.66
Pasir semen (lokal) M3 0.0230 Rp. 745,150.00 Rp. 17,138.45
Pekerja pasir/batu OH 0.3000 Rp. 152,000.00 Rp. 45,600.00
Tukang pasir/batu OH 0.1500 Rp. 194,000.00 Rp. 29,100.00
Kepala tukang pasir/batu OH 0.0150 Rp. 202,000.00 Rp. 3,030.00
Mandor pasir/batu OH 0.0150 Rp. 213,000.00 Rp. 3,195.00
JUMLAH Rp. 114,113.11

HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA
SATUAN HARGA
1 2 3 4 5 = (3) x (4)
3 1 M3 Cor Lantai
Campuran Beton 1PC : 2PS Pasir Import - Manual
Semen Portland (PC) @ 50 Kg Zak 15.1500 Rp. 103,170.00 Rp. 1,563,025.50
Pasir semen (import) M3 1.0821 Rp. 1,158,663.00 Rp. 1,253,838.89
Mandor pasir/batu OH 0.3000 Rp. 213,000.00 Rp. 63,900.00
Kepala tukang pasir/batu OH 0.1000 Rp. 202,000.00 Rp. 20,200.00
Tukang pasir/batu OH 1.0000 Rp. 194,000.00 Rp. 194,000.00
Pekerja pasir/batu OH 6.0000 Rp. 213,000.00 Rp. 1,278,000.00
JUMLAH Rp. 4,372,964.39
V. PEKERJAAN LANTAI DAN DINDING

1 1 M2 Lantai Keramik Ukuran 60 x 60 cm


Ubin Teralux Marmer Ukuran 60 x 60 cm Buah 3.1000 Rp. 73,236.00 Rp. 227,031.60
Semen Portland (PC) @ 50 Kg KG 9.6000 Rp. 2,064.00 Rp. 19,814.40
Pasir Semen (lokal) M3 0.0450 Rp. 745,150.00 Rp. 33,531.75
Semen Warna KG 1.5000 Rp. 2,714.00 Rp. 4,071.00
Pekerja OH 0.2400 Rp. 152,000.00 Rp. 36,480.00
Tukang batu OH 0.1200 Rp. 194,000.00 Rp. 23,280.00
Kepala tukang OH 0.0120 Rp. 202,000.00 Rp. 2,424.00
Mandor OH 0.0120 Rp. 213,000.00 Rp. 2,556.00
JUMLAH Rp. 349,188.75
2 1 M2 Lantai Keramik Untuk Tangga, Uk. 30 x 30 cm

Keramik Lantai 30 x 30 cm Buah 11.8700 Rp. 7,502.00 Rp. 89,048.74


Semen Portland (PC) @ 50 Kg KG 10.0000 Rp. 2,064.00 Rp. 20,640.00
Pasir Semen (lokal) M3 0.0450 Rp. 745,150.00 Rp. 33,531.75
Semen Warna KG 1.5000 Rp. 2,714.00 Rp. 4,071.00
Pekerja OH 0.7000 Rp. 152,000.00 Rp. 106,400.00
Tukang batu OH 0.3500 Rp. 194,000.00 Rp. 67,900.00
Kepala tukang OH 0.0350 Rp. 202,000.00 Rp. 7,070.00
Mandor OH 0.0350 Rp. 213,000.00 Rp. 7,455.00
JUMLAH Rp. 336,116.49

3 1 M2 Lantai Keramik Untuk Km/Wc, Uk. 20 x 20 cm

Ubin Warna Ukuran 20 x 20 Buah 26.5000 Rp. 3,250.00 Rp. 86,125.00


Semen Portland (PC) @ 50 Kg KG 10.4000 Rp. 2,064.00 Rp. 21,465.60
Pasir Semen (lokal) M3 0.0450 Rp. 745,150.00 Rp. 33,531.75
Semen Warna KG 1.6200 Rp. 2,714.00 Rp. 4,396.68
Pekerja OH 0.7000 Rp. 152,000.00 Rp. 106,400.00
Tukang batu OH 0.3500 Rp. 194,000.00 Rp. 67,900.00
Kepala tukang OH 0.0350 Rp. 202,000.00 Rp. 7,070.00
Mandor OH 0.0350 Rp. 213,000.00 Rp. 7,455.00
JUMLAH Rp. 334,344.03
4 1 M2 Dinding Keramik Km/Wc,Uk. 20 x 20, Tinggi 1,2 m

Porselin Ukuran 20 x 20 cm Buah 26.5000 Rp. 3,250.00 Rp. 86,125.00


Semen Portland (PC) @ 50 Kg KG 9.3000 Rp. 2,064.00 Rp. 19,195.20
Pasir Semen (lokal) M3 0.0180 Rp. 745,150.00 Rp. 13,412.70
Semen Warna KG 1.9400 Rp. 2,714.00 Rp. 5,265.16
Pekerja OH 0.9000 Rp. 152,000.00 Rp. 136,800.00
Tukang batu OH 0.4500 Rp. 194,000.00 Rp. 87,300.00
Kepala tukang OH 0.0450 Rp. 202,000.00 Rp. 9,090.00
Mandor OH 0.0450 Rp. 213,000.00 Rp. 9,585.00
JUMLAH Rp. 366,773.06
HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA
SATUAN HARGA
1 2 3 4 5 = (3) x (4)
VI. PEKERJAAN ATAP

1 1 M3 Konstruksi Kuda-Kuda, Kayu Kelas II


Balok Kayu Kelas II (Kayu Rahay) M3 1.1000 Rp. 4,179,150.00 Rp. 4,597,065.00
Paku Campuran KG 5.6000 Rp. 20,976.00 Rp. 117,465.60
Pekerja Kayu OH 4.0000 Rp. 152,000.00 Rp. 608,000.00
Tukang Kayu OH 12.0000 Rp. 194,000.00 Rp. 2,328,000.00
Kepala Tukang OH 1.2000 Rp. 202,000.00 Rp. 242,400.00
Mandor OH 0.2000 Rp. 213,000.00 Rp. 42,600.00
JUMLAH Rp. 7,935,530.60
2 1 M3 Konstruksi Gordeng - Kayu Kelas II
Balok Kayu Kelas II (Kayu Rahay) M3 1.1000 Rp. 4,179,150.00 Rp. 4,597,065.00
Paku Campuran KG 3.0000 Rp. 20,976.00 Rp. 62,928.00
Pekerja Kayu OH 2.4000 Rp. 152,000.00 Rp. 364,800.00
Tukang Kayu OH 7.2000 Rp. 194,000.00 Rp. 1,396,800.00
Kepala Tukang OH 0.7200 Rp. 202,000.00 Rp. 145,440.00
Mandor OH 0.1200 Rp. 213,000.00 Rp. 25,560.00
JUMLAH Rp. 6,592,593.00
3 1 M2 Penutup Atap Seng Gelombang BJLS 0,20 mm
Seng Gelombang BJLS 0,20 Lbr 0.7000 Rp. 53,450.00 Rp. 37,415.00
Paku Seng KG 0.0200 Rp. 37,350.00 Rp. 747.00
Pekerja OH 0.1200 Rp. 152,000.00 Rp. 18,240.00
Tukang Kayu OH 0.0600 Rp. 194,000.00 Rp. 11,640.00
Kepala Tukang OH 0.0060 Rp. 202,000.00 Rp. 1,212.00
Mandor OH 0.0060 Rp. 213,000.00 Rp. 1,278.00
JUMLAH Rp. 70,532.00
4 1 M' Lisplank Ukuran (2 x 20) cm, Kayu Kelas II

Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm M3 0.0046 Rp. 4,179,150.00 Rp. 19,224.09
Paku Campuran KG 0.0600 Rp. 20,976.00 Rp. 1,258.56
Pekerja Kayu OH 0.1000 Rp. 152,000.00 Rp. 15,200.00
Tukang Kayu OH 0.1000 Rp. 194,000.00 Rp. 19,400.00
Kepala Tukang OH 0.0100 Rp. 202,000.00 Rp. 2,020.00
Mandor OH 0.0050 Rp. 213,000.00 Rp. 1,065.00
JUMLAH Rp. 58,167.65
VII. PEKERJAAN PLAFOND

1 1 M2 Rangka Plafond (60 x 120), Kayu Kelas II


Balok Kayu Kelas II (Kayu Rahay) M3 0.0130 Rp. 4,179,150.00 Rp. 54,328.95
Paku Campuran KG 0.1200 Rp. 20,976.00 Rp. 2,517.12
Pekerja Kayu OH 0.1700 Rp. 152,000.00 Rp. 25,840.00
Tukang Kayu OH 0.2700 Rp. 194,000.00 Rp. 52,380.00
Kepala Tukang OH 0.0270 Rp. 202,000.00 Rp. 5,454.00
Mandor OH 0.0085 Rp. 213,000.00 Rp. 1,810.50
JUMLAH Rp. 142,330.57
2 1 M2 Langit-langit Gypsum Board
Ukuran (1200 x 2400 x 9) mm

Gypsum Board (1200 x 2400 x 9) mm Lbr 0.3640 Rp. 92,400.00 Rp. 33,633.60
Paku Skrup KG 0.1100 Rp. 8,362.00 Rp. 919.82
Pekerja OH 0.1000 Rp. 152,000.00 Rp. 15,200.00
Tukang OH 0.0500 Rp. 194,000.00 Rp. 9,700.00
Kepala Tukang OH 0.0050 Rp. 202,000.00 Rp. 1,010.00
Mandor OH 0.0050 Rp. 213,000.00 Rp. 1,065.00
JUMLAH Rp. 61,528.42
HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA
SATUAN HARGA
1 2 3 4 5 = (3) x (4)
VIII. PEKERJAAN KUSEN PINTU DAN JENDELA
1 1 M3 Kusen Pintu dan Jendela Kayu Kelas II
Balok Kayu Kelas II (Kayu Rahay) M3 1.2000 Rp. 4,179,150.00 Rp. 5,014,980.00
Paku Campuran KG 1.2500 Rp. 20,976.00 Rp. 26,220.00
Lem Kayu KG 1.0000 Rp. 49,830.00 Rp. 49,830.00
Pekerja Kayu OH 6.0000 Rp. 152,000.00 Rp. 912,000.00
Tukang Kayu OH 18.0000 Rp. 194,000.00 Rp. 3,492,000.00
Kepala Tukang OH 1.8000 Rp. 202,000.00 Rp. 363,600.00
Mandor OH 0.3000 Rp. 213,000.00 Rp. 63,900.00
JUMLAH Rp. 9,922,530.00
2 1 M2 Jendela UK. 168 x 200 cm ( J1 )
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm M3 0.0240 Rp. 4,179,150.00 Rp. 100,299.60
Kaca Rayben 5 mm M2 1.0000 Rp. 165,858.00 Rp. 165,858.00
Lem Kayu KG 0.3000 Rp. 16,570.00 Rp. 4,971.00
Pekerja Kayu OH 0.8000 Rp. 13,970.00 Rp. 11,176.00
Tukang Kayu OH 2.4000 Rp. 69,420.00 Rp. 166,608.00
Kepala Tukang OH 0.2400 Rp. 20,976.00 Rp. 5,034.24
Mandor OH 0.0400 Rp. 213,000.00 Rp. 8,520.00
JUMLAH Rp. 462,466.84
3 1 M2 Jendela UK. 144 x 140 cm ( J2 )
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm M3 0.0240 Rp. 4,179,150.00 Rp. 100,299.60
Kaca Rayben 5 mm M2 1.0000 Rp. 165,858.00 Rp. 165,858.00
Lem Kayu KG 0.3000 Rp. 16,570.00 Rp. 4,971.00
Pekerja Kayu OH 0.8000 Rp. 13,970.00 Rp. 11,176.00
Tukang Kayu OH 2.4000 Rp. 69,420.00 Rp. 166,608.00
Kepala Tukang OH 0.2400 Rp. 20,976.00 Rp. 5,034.24
Mandor OH 0.0400 Rp. 213,000.00 Rp. 8,520.00
JUMLAH Rp. 462,466.84
4 1 M2 Jendela UK. 222 x 140 cm ( J3 )
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm M3 0.0240 Rp. 4,179,150.00 Rp. 100,299.60
Kaca Rayben 5 mm M2 1.0000 Rp. 165,858.00 Rp. 165,858.00
Lem Kayu KG 0.3000 Rp. 16,570.00 Rp. 4,971.00
Pekerja Kayu OH 0.8000 Rp. 13,970.00 Rp. 11,176.00
Tukang Kayu OH 2.4000 Rp. 69,420.00 Rp. 166,608.00
Kepala Tukang OH 0.2400 Rp. 20,976.00 Rp. 5,034.24
Mandor OH 0.0400 Rp. 213,000.00 Rp. 8,520.00
JUMLAH Rp. 462,466.84
5 1 M2 Ventilasi UK. 70 x 140 cm ( V1 )
Balok kayu Rahay M3 0.0042 Rp. 4,179,150.00 Rp. 17,552.43
Paku Campuran M2 0.1500 Rp. 20,976.00 Rp. 3,146.40
Pekerja kayu Bh 0.1250 Rp. 152,000.00 Rp. 19,000.00
Tukang kayu Bh 0.0500 Rp. 194,000.00 Rp. 9,700.00
Kepala tukang kayu Bh 0.0500 Rp. 202,000.00 Rp. 10,100.00
Mandor kayu OH 0.0500 Rp. 213,000.00 Rp. 10,650.00
JUMLAH Rp. 70,148.83
6 1 M2 Ventilasi UK. 30 x 100 cm ( V2 )
Balok kayu Rahay M3 0.0042 Rp. 4,179,150.00 Rp. 17,552.43
Paku Campuran M2 0.1500 Rp. 20,976.00 Rp. 3,146.40
Pekerja kayu Bh 0.1250 Rp. 152,000.00 Rp. 19,000.00
Tukang kayu Bh 0.0500 Rp. 194,000.00 Rp. 9,700.00
Kepala tukang kayu Bh 0.0500 Rp. 202,000.00 Rp. 10,100.00
Mandor kayu OH 0.0500 Rp. 213,000.00 Rp. 10,650.00
JUMLAH Rp. 70,148.83
7 1 M2 Pintu Uk. 170 x 210 cm
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm M3 0.0400 Rp. 4,179,150.00 Rp. 167,166.00
Lem Kayu KG 0.5000 Rp. 49,830.00 Rp. 24,915.00
Pekerja Kayu OH 1.0000 Rp. 152,000.00 Rp. 152,000.00
Tukang Kayu OH 3.0000 Rp. 194,000.00 Rp. 582,000.00
Kepala Tukang OH 0.3000 Rp. 202,000.00 Rp. 60,600.00
Mandor OH 0.0500 Rp. 213,000.00 Rp. 10,650.00
JUMLAH Rp. 997,331.00
8 1 M2 Pintu Uk. 80 x 210 cm
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm M3 0.0400 Rp. 4,179,150.00 Rp. 167,166.00
Lem Kayu KG 0.5000 Rp. 49,830.00 Rp. 24,915.00
Pekerja Kayu OH 1.0000 Rp. 152,000.00 Rp. 152,000.00
Tukang Kayu OH 3.0000 Rp. 194,000.00 Rp. 582,000.00
Kepala Tukang OH 0.3000 Rp. 202,000.00 Rp. 60,600.00
Mandor OH 0.0500 Rp. 213,000.00 Rp. 10,650.00
JUMLAH Rp. 997,331.00
9 1 M2 Pintu UK. 70 x 210 cm
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm M3 0.0400 Rp. 4,179,150.00 Rp. 167,166.00
Lem Kayu KG 0.5000 Rp. 49,830.00 Rp. 24,915.00
Pekerja Kayu OH 1.0000 Rp. 152,000.00 Rp. 152,000.00
Tukang Kayu OH 3.0000 Rp. 194,000.00 Rp. 582,000.00
Kepala Tukang OH 0.3000 Rp. 202,000.00 Rp. 60,600.00
Mandor OH 0.0500 Rp. 213,000.00 Rp. 10,650.00
JUMLAH Rp. 997,331.00
HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA
SATUAN HARGA
1 2 3 4 5 = (3) x (4)

IX. PEKERJAAN PENGECATAN

1 1 M2 Cat Meny Kayu

Cat meny kayu KG 0.1700 Rp. 68,333.00 Rp. 11,616.61


Minyak Cat Liter 0.1000 Rp. 55,000.00 Rp. 5,500.00
Kuas Bh 0.0150 Rp. 350,630.00 Rp. 5,259.45
Mandor cat OH 0.0040 Rp. 213,000.00 Rp. 852.00
Pekerja cat OH 0.0750 Rp. 152,000.00 Rp. 11,400.00
JUMLAH Rp. 34,628.06
2 1 M2 Cat Kilap Kayu
Cat dasar/cat kayu KG 0.1700 Rp. 64,500.00 Rp. 10,965.00
Minyak Cat Liter 0.1000 Rp. 55,000.00 Rp. 5,500.00
Amplas Bh 1.0000 Rp. 5,416.00 Rp. 5,416.00
Kuas Bh 0.0150 Rp. 350,630.00 Rp. 5,259.45
Kepala tukang cat OH 0.0080 Rp. 202,000.00 Rp. 1,616.00
Tukang cat OH 0.0750 Rp. 194,000.00 Rp. 14,550.00
JUMLAH Rp. 43,306.45

3 1 M2 Cat Tembok Untuk Dinding

Plamur KG 0.1000 Rp. 7,480.00 Rp. 748.00


Cat dasar KG 0.1000 Rp. 19,056.00 Rp. 1,905.60
Cat penutup 2 kali KG 0.2600 Rp. 19,056.00 Rp. 4,954.56
Mandor cat OH 0.0025 Rp. 213,000.00 Rp. 532.50
Kepala tukang cat OH 0.0063 Rp. 202,000.00 Rp. 1,272.60
Tukang cat OH 0.0630 Rp. 194,000.00 Rp. 12,222.00
Pekerja cat OH 0.0200 Rp. 152,000.00 Rp. 3,040.00
JUMLAH Rp. 24,675.26

4 1 M2 Cat Plafond

Plamur KG 0.1000 Rp. 7,480.00 Rp. 748.00


Cat Tembok (Setara Dulux Weathershield) KG 0.4700 Rp. 26,580.00 Rp. 12,492.60
Kertas amplas (kayu) Lbr 0.5000 Rp. 5,434.00 Rp. 2,717.00
Kuas roll Bh 0.0100 Rp. 33,590.00 Rp. 335.90
Kapek Bh 0.0500 Rp. 5,000.00 Rp. 250.00
Mandor cat OH 0.0030 Rp. 213,000.00 Rp. 639.00
Kepala tukang cat OH 0.0040 Rp. 202,000.00 Rp. 808.00
Tukang cat OH 0.0400 Rp. 194,000.00 Rp. 7,760.00
Pekerja cat OH 0.0600 Rp. 152,000.00 Rp. 9,120.00
JUMLAH Rp. 34,870.50

X. PEKEKERJAAN INSTALASI LISTRIK

1 1 Titik Instalasi Lampu SL 18 - 23 VA+ Pitting + Saklar

Vetting lampu Bh 1.0000 Rp. 12,600.00


Rp. 12,600.00
Kabel NYA 2x1,5 mm M 7.0000 Rp. 8,642.00
Rp. 60,494.00
Saklar Bh 1.0000 Rp. 25,240.00
Rp. 25,240.00
Lampu SL 23 VA Bh 1.0000 Rp. 54,725.00
Rp. 54,725.00
Klem Kabel Dos 0.2000 Rp. 21,970.00
Rp. 4,394.00
Isolasi Bh 0.1000 Rp. 10,295.00
Rp. 1,029.50
Sekrup Dos 0.1000 Rp. 34,745.00
Rp. 3,474.50
Upah Memasang LS 1.0000 Rp. 60,000.00 Rp. 60,000.00
JUMLAH Rp. 221,957.00

HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA
SATUAN HARGA
1 2 3 4 5 = (3) x (4)
2 1 Ttitik Instalasi Lampu SL 8 - 14 VA+ Pitting + Saklar

Vetting lampu Bh 1.0000 Rp. 12,600.00


Rp. 12,600.00
Kabel NYA 2x1,5 mm M 7.0000 Rp. 8,642.00
Rp. 60,494.00
Saklar Bh 1.0000 Rp. 25,240.00
Rp. 25,240.00
Lampu SL 14 VA Bh 1.0000 Rp. 43,225.00
Rp. 43,225.00
Klem Kabel Dos 0.2000 Rp. 21,970.00
Rp. 4,394.00
Isolasi Bh 0.1000 Rp. 10,295.00
Rp. 1,029.50
Sekrup Dos 0.1000 Rp. 34,745.00
Rp. 3,474.50
Upah Memasang LS 1.0000 Rp. 60,000.00 Rp. 60,000.00
JUMLAH Rp. 210,457.00

3 1 Titik Saklar Ganda

Saklar Ganda Bh 1.0000 Rp. 25,240.00 Rp. 25,240.00


Upah Memasang OH 1.0000 Rp. 304,000.00 Rp. 304,000.00
Alat Bantu + Aksesoris LS 1.0000 Rp. 2,524.00 Rp. 2,524.00
JUMLAH Rp. 331,764.00
4 1 Titik Saklar Tunggal

Saklar Tunggal Bh 1.0000 Rp. 19,040.00 Rp. 19,040.00


Upah Memasang OH 1.0000 Rp. 304,000.00 Rp. 304,000.00
Alat Bantu + Aksesoris LS 1.0000 Rp. 1,904.00 Rp. 1,904.00
JUMLAH Rp. 324,944.00
5 1 Titik Instalasi Stop Kontak

Stop Kontak Bh 1.0000 Rp. 28,290.00


Rp. 28,290.00
Kabel NYA 3x2.5 mm M 3.0000 Rp. 14,680.00
Rp. 44,040.00
Klem Kabel Dos 0.2000 Rp. 21,970.00
Rp. 4,394.00
Isolasi Bh 0.1000 Rp. 10,295.00
Rp. 1,029.50
Sekrup Dos 0.1000 Rp. 34,745.00
Rp. 3,474.50
Upah Memasang LS 1.0000 Rp. 60,000.00 Rp. 60,000.00
JUMLAH Rp. 141,228.00
6 1 Titik Panel Box

Panel Box Bh 1.0000 Rp. 12,500,870.00 Rp. 12,500,870.00


Upah Memasang OH 1.0000 Rp. 380,000.00 Rp. 380,000.00
Alat Bantu + Aksesoris LS 1.0000 Rp. 6,250,435.00 Rp. 6,250,435.00
JUMLAH Rp. 19,131,305.00

XI. PEKEKERJAAN SANITASI


1 1 BH Bak Kontrol Pasangan Bata Ukuran (60 x 60) x 65 cm

Batu Bata Bh 371.0000 Rp. 1,350.00 Rp. 500,850.00


Semen Portland (PC) @ 50 Kg KG 114.0000 Rp. 2,063.40 Rp. 235,227.60
Pasir semen (lokal) M3 0.1840 Rp. 745,150.00 Rp. 137,107.60
Kerikil/batu pecah (import) M3 0.0330 Rp. 1,162,560.00 Rp. 38,364.48
Besi tulangan beton dia. 10 mm KG 4.8500 Rp. 11,890.00 Rp. 57,666.50
Pasir semen (import) M3 0.1200 Rp. 1,158,663.00 Rp. 139,039.56
Pekerja pasir/batu OH 2.1600 Rp. 152,000.00 Rp. 328,320.00
Tukang gali OH 0.1000 Rp. 194,000.00 Rp. 19,400.00
Tukang pasir/batu OH 0.7200 Rp. 194,000.00 Rp. 139,680.00
Kepala tukang pasir/batu OH 0.0720 Rp. 202,000.00 Rp. 14,544.00
Mandor pasir/batu OH 0.1080 Rp. 213,000.00 Rp. 23,004.00
JUMLAH Rp. 1,633,203.74
HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA
SATUAN HARGA
1 2 3 4 5 = (3) x (4)
2 1 Bh Closet jongkok porselin
Closet jongkok porselin Buah 1.0000 Rp. 603,760.00 Rp. 603,760.00
Semen Portland (PC) @ 50 Kg KG 6.0000 Rp. 2,064.00 Rp. 12,384.00
Pasir semen (lokal) M3 0.0100 Rp. 745,150.00 Rp. 7,451.50
Pekerja pasir/batu OH 1.0000 Rp. 152,000.00 Rp. 152,000.00
Tukang pasir/batu OH 1.5000 Rp. 194,000.00 Rp. 291,000.00
Kepala tukang pasir/batu OH 0.1500 Rp. 202,000.00 Rp. 30,300.00
Mandor pasir/batu OH 0.1600 Rp. 213,000.00 Rp. 34,080.00
JUMLAH Rp. 1,130,975.50
3 1 Unit Septictank 2 x (1 x 1) dalam 1,5 M + Resapan
Galian Tanah Biasa Sedalam 1 - 2 M M3 11.8500 Rp. 168,340.00 Rp. 1,994,829.00
Semen Portland (PC) @ 50 Kg Zak 6.0000 Rp. 103,170.00 Rp. 619,020.00
Pasir semen (lokal) M3 2.5000 Rp. 745,150.00 Rp. 1,862,875.00
Batu bata Buah 1,216.00 Rp. 1,350.00 Rp. 1,641,600.00
Besi beton dia 10 mm KG 112.4000 Rp. 11,890.00 Rp. 1,336,436.00
Kawat ikat beton KG 0.5000 Rp. 25,250.00 Rp. 12,625.00
Papan begisting kayu bus M3 0.0880 Rp. 2,095,260.00 Rp. 184,382.88
Besi Pipa Dia 2" PVC M 2.0000 Rp. 65,900.00 Rp. 131,800.00
Paku 2" KG 0.1000 Rp. 21,110.00 Rp. 2,111.00
Mandor pasir/batu OH 0.2500 Rp. 213,000.00 Rp. 53,250.00
Kepala tukang pasir/batu OH 0.5000 Rp. 202,000.00 Rp. 101,000.00
Tukang pasir/batu OH 5.0000 Rp. 194,000.00 Rp. 970,000.00
Pekerja pasir/batu OH 2.5000 Rp. 152,000.00 Rp. 380,000.00
JUMLAH Rp. 9,289,928.88
4 1 M' Memasang Pipa PVC Tipe AW Dia. 3/4"
Pipa PVC Tipe AW Dia. 3/4" M 1.2000 Rp. 33,078.00 Rp. 39,693.60
Perlengkapan Set 1.0000 Rp. 11,577.30 Rp. 11,577.30
Pekerja OH 0.0360 Rp. 152,000.00 Rp. 5,472.00
Tukang pipa OH 0.0600 Rp. 194,000.00 Rp. 11,640.00
Kepala tukang OH 0.0060 Rp. 202,000.00 Rp. 1,212.00
Mandor OH 0.0018 Rp. 213,000.00 Rp. 383.40
JUMLAH Rp. 69,978.30
5 1 M' Memasang Pipa PVC Tipe AW Dia. 4"
Pipa PVC Tipe AW Dia. 4" M 1.2000 Rp. 46,793.00 Rp. 56,151.60
Perlengkapan Set 1.0000 Rp. 16,377.55 Rp. 16,377.55
Pekerja OH 0.0810 Rp. 152,000.00Rp. 12,312.00
Tukang pipa OH 0.1350 Rp. 194,000.00Rp. 26,190.00
Kepala tukang OH 0.1350 Rp. 202,000.00Rp. 27,270.00
Mandor OH 0.0041 Rp. 213,000.00Rp. 873.30
JUMLAH Rp. 139,174.45
6 1 BH Kran air Dia. 3/4" atau 1/2"
Kran air Dia. 3/4" atau 1/2" Buah 1.2000 Rp. 33,170.00 Rp. 39,804.00
Seal Tape Buah 0.0250 Rp. 5,000.00 Rp. 125.00
Tukang pipa OH 0.1000 Rp. 194,000.00 Rp. 19,400.00
Kepala tukang OH 0.0100 Rp. 202,000.00 Rp. 2,020.00
213,000.00 Rp. 61,349.00
7 1 UNIT Pompa dragon/pompa tangan
Pompa Dragon Buah 1.0000 Rp. 650,000.00 Rp. 650,000.00
Shock ulir Buah 1.0000 Rp. 25,000.00 Rp. 25,000.00
L Bough 2" Buah 2.0000 Rp. 6,000.00 Rp. 12,000.00
Pipa PVC dia 1" ( D ) Btg 2.0000 Rp. 12,500.00 Rp. 25,000.00
Lem PVC Buah 0.1000 Rp. 10,000.00 Rp. 1,000.00
Campuran 1PC : 3PS - import ( 0,4 x 0,4 x 0,4 ) Upah kerja M3 0.0640 Rp. 4,123,087.00 Rp. 263,877.57
Alat bantu LS 1.0000 Rp. 25,000.00 Rp. 25,000.00
194,000.00 Rp. 1,001,877.57
Pekerjaan : 1 M2
Referensi : SNI 3434:2008

NO KOMPONEN

1 2
A TENAGA
Pekerja Kayu
Tukang Kayu
Kepala Tukang
Mandor

B BAHAN
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm
Kaca Rayben 5 mm
Lem Kayu

C PERALATAN

D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan


E Overhead + Profit
F Harga Satuan Pekerjaan(D+E)
G Jumlah harga dibulatkan

Pekerjaan : 1 M2
Referensi : SNI 3434:2008

NO KOMPONEN

1 2
A TENAGA
Pekerja Kayu
Tukang Kayu
Kepala Tukang
Mandor

B BAHAN
Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm
Lem Kayu

C PERALATAN

D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan


E Overhead + Profit
F Harga Satuan Pekerjaan(D+E)
G Jumlah harga dibulatkan
Pintu, Jendela dan Ventilasi Kaca Bingkai Kayu Kelas II

PERKIRAAN
ONEN SATUANKUANTITAS KODE

4 5 3

OH 0.8000 L-4
OH 2.4000 L-3
OH 0.2400 L-2
OH 0.0400 L-1
JUMLAH HARGA TE

yu Rahay) tebal = 2 Cm M3 0.0240 MC.6


M2 1.0000 MG.10
KG 0.3000 MN.1
JUMLAH HARGA B

JUMLAH HARGA PERAL

n dan Peralatan

Daun Pintu Panel Kayu Kelas II

PERKIRAAN
ONEN SATUANKUANTITAS KODE

4 5 3

OH 1.0000 L-4
OH 3.0000 L-3
OH 0.3000 L-2
OH 0.0500 L-1
JUMLAH HARGA TE

yu Rahay) tebal = 2 Cm M3 0.0400 MC.6


KG 0.5000 MN.1
JUMLAH HARGA B

JUMLAH HARGA PERAL

n dan Peralatan
Kode Analisa :

HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6 7

152,000.00 121,600.00
194,000.00 465,600.00
202,000.00 48,480.00
213,000.00 8,520.00
JUMLAH HARGA TENAGA 644,200.00

4,179,150.00 100,299.60
217,890.00 217,890.00
49,830.00 14,949.00
JUMLAH HARGA BAHAN 333,138.60

- -

JUMLAH HARGA PERALATAN -

977,338.60
0% -
977,338.60
977,338.00

Kode Analisa :

HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6 7

152,000.00 152,000.00
194,000.00 582,000.00
202,000.00 60,600.00
213,000.00 10,650.00
JUMLAH HARGA TENAGA 805,250.00

4,179,150.00 167,166.00
49,830.00 24,915.00
JUMLAH HARGA BAHAN 192,081.00

- -

JUMLAH HARGA PERALATAN -

997,331.00
0% -
997,331.00
997,331.00
DAFTAR HARGA SATUAN
BAHAN DAN UPAH

No. NAMA BAHAN / UPAH SATUAN HARGA SATUAN

1 2 3 4

A. BAHAN BAKAR DAN PENCAMPUR


1 Bensin (Non Subsidi) Liter Rp. 15,020.00
2 Solar (Non Subsidi) Liter Rp. 14,124.00
3 Minyak Tanah (Non Subsidi) Liter Rp. 12,644.00
4 Minyak Pelumas / Olie Liter Rp. 35,407.00
5 Minyak Bekisting / Oli Bekas Liter Rp. 907.00
6 Polimer Liter Rp. 18,567.00
7 Aspal / Teer Kg Rp. 15,912.00
8 Residu Liter Rp. 24,458.00
9 Air Liter Rp. 57.00
B. BAHAN PASIR, BATU DAN SEMEN
1 Pasir Semen (Import) M3 Rp. 1,158,663.00
2 Pasir Pasang Lokal (kualitas baik) M3 Rp. 745,150.00
3 Tanah Timbun biasa M3 Rp. 259,070.00
4 Tanah Pilihan (Selmat) M3 Rp. 259,070.00
5 Batu Kerikil/Koral beton (Import) M3 Rp. 1,162,560.00
6 Batu Kali/Gunung (Import) M3 Rp. 1,255,560.00
7 Batu Bata Merah Buah Rp. 1,350.00
8 Batu Cetak 10 x 20 x 30 Cm Buah Rp. 2,740.00
9 Paving Blok (tidak Warna) Buah Rp. 6,730.00
10 Semen Portland (PC) @ 50 Kg Zak Rp. 103,170.00
11 Semen PC Putih / Warna Zak Rp. 135,670.00
12 Tepung Gypsum Zak Rp. 109,140.00
C. BAHAN KAYU, TRIPLEKS DLL
1 Balok Kayu Kelas III (Kayu Bus) M3 Rp. 2,905,260.00
2 Balok Kayu Kelas II (Kayu Rahay) M3 Rp. 4,179,150.00
3 Balok Kayu Kelas I (Kayu Besi) M3 Rp. 6,203,030.00
4 Balok Kayu Kelas IV (Kayu Campur) M3 Rp. 2,619,430.00
5 Papan Kayu Kelas III (Kayu Bus) t : 2-5 cm M3 Rp. 2,095,260.00
6 Papan Kayu Kelas II (Kayu Rahay) t : 2 cm M3 Rp. 4,179,150.00
7 Papan Kayu Kelas II (Kayu Rahay) t : 3 cm M3 Rp. 4,179,150.00
8 Papan Kayu Kelas I (Kayu Besi) t : 2-3 cm M3 Rp. 6,203,030.00
9 Papan Kayu Kelas IV (tebal = 2-5 cm) M3 Rp. 2,619,430.00
10 Kayu Lat/Reng/List, Kayu Kelas II Batang Rp. 25,370.00
11 Tripleks (1,22 x 2,44) cm - tebal 3 mm Lembar Rp. 66,030.00
12 Tripleks (1,22 x 2,44) cm - tebal 4 mm Lembar Rp. 83,140.00
13 Tripleks (1,22 x 2,44) cm - tebal 6 mm Lembar Rp. 106,860.00
14 Tripleks (1,22 x 2,44) cm - tebal 9 mm Lembar Rp. 155,933.00
No. NAMA BAHAN / UPAH SATUAN HARGA SATUAN

1 2 3 4
15 Tripleks (1,22 x 2,44) cm - tebal 12 mm Lembar Rp. 211,630.00
16 Tripleks (1,22 x 2,44) cm - tebal 15 mm Lembar Rp. 272,860.00
17 Tripleks (1,22 x 2,44) cm - tebal 18 mm Lembar Rp. 307,876.00
18 Tripleks (1,22 x 2,44) cm - tebal 22 mm Lembar Rp. 311,240.00
19 Teak - Wood (1.22 x 2.44 Cm) - 3 mm Lembar Rp. 126,530.00
20 Teak - Wood (0.92 x 2.44 Cm) - 4 mm Lembar Rp. 102,873.00
21 Plywood - Multiplex Lembar Rp. 453,770.00
22 Melamin Lembar Rp. 144,676.00
23 Formika Polos (122 x 244) Cm Lembar Rp. 303,060.00
24 Pelat Asbes Tebal 6 mm Lembar Rp. 130,190.00
25 Pelat Asbes Tebal 5 mm Lembar Rp. 67,660.00
26 Pelat Asbes Tebal 4 mm Lembar Rp. 63,130.00
27 Gypsum Board tebal 9 mm Lembar Rp. 92,400.00
28 List profil Gypsum Lebar Sampai 5 cm M' Rp. 45,325.00
29 Hard Board Lembar Rp. 84,650.00
30 Tiang Kayu Bulat (Dia 20 cm, L=4-6 m) Batang Rp. 149,390.00
31 Tiang Kayu Bulat (Dia 25-30 cm, L=4-6 m) Batang Rp. 242,230.00
32 Kayu dolken Ø 8-10, L=4 M Batang Rp. 17,020.00
33 Patok kayu (Dia = 3 cm, L= 1 m) Batang Rp. 3,000.00
34 Patok kayu (Dia = 5 cm, L= 5 m) Batang Rp. 5,000.00
35 Kayu Bakar (Campuran) M3 Rp. 400,000.00
D. BAHAN BESI, PAKU DAN KAWAT
1 Besi Beton Dia.6 mm (SNI) Kg Rp. 13,022.00
2 Besi Beton Dia.8 mm (SNI) Kg Rp. 11,890.00
3 Besi Beton Dia.10 mm (SNI) Kg Rp. 11,890.00
4 Besi Beton Dia.12 mm (SNI) Kg Rp. 12,168.00
5 Besi Beton Dia.14 mm (SNI) KG Rp. 12,697.00
6 Besi Beton Dia.16 mm (SNI) KG Rp. 14,273.00
7 Besi Beton Dia.19 mm (SNI) KG Rp. 12,791.00
8 Besi Beton Dia.22 mm (SNI) KG Rp. 12,993.00
9 Kawat Beton KG Rp. 25,250.00
10 Kawat beton / bindrat 4 mm KG Rp. 25,820.00
11 Paku 1" (2,5 - 3 cm) KG Rp. 23,310.00
12 Paku 2" (5 cm) KG Rp. 21,110.00
13 Paku 3" (7 cm) KG Rp. 21,143.00
14 Paku 4" (10 cm) KG Rp. 20,976.00
15 Paku 5" (12 - 15 cm) KG Rp. 20,643.00
16 Paku Campur KG Rp. 20,976.00
17 Paku Seng KG Rp. 37,350.00
18 Paku Ardex Ulir KG Rp. 50,310.00
19 Paku Sirap Buah Rp. 15,310.00
20 Paku Ondoline KG Rp. 20,310.00
No. NAMA BAHAN / UPAH SATUAN HARGA SATUAN

1 2 3 4
21 Paku Tembok / Kecil 2/3 Buah Rp. 326.33
22 Paku/Skrup 5 cm KG Rp. 8,362.00
23 Kawat Nyamuk (Plastik / Nylon) M Rp. 24,577.00
24 Kawat Has / Bankhas dia 12 mm M2 Rp. 29,946.00
25 Kawat Harmonika Has 40x40 mm M Rp. 70,327.00
26 Kawat burung M² Rp. 25,994.00
27 Kawat Duri Baja 25 M KG Rp. 20,430.00
28 Kawat Las 0.26 Dos Rp. 159,280.00
29 Timah Solder KG Rp. 64,400.00
30 Baut Jembatan Dia. 19 mm KG Rp. 15,310.00
31 Baut Dia, 3/8" - 17.5 + Mur - Ring Buah Rp. 8,760.00
32 Baut Dia, 3/8" - 12.0/15.0 + Mur - Ring Buah Rp. 7,410.00
33 Baut Dia, 3/8" - 20.0 + Mur - Ring Buah Rp. 7,560.00
34 Baut Dia, 3/8" - 35.0 + Mur - Ring Buah Rp. 6,310.00
35 Besi angkur dia. 8 mm Buah Rp. 10,310.00
36 Kasa (Ram Ayam) Dia, 10 mm M Rp. 27,251.00
37 Besi Siku 30 . 30 . 3 - L = 6 Meter Batang Rp. 84,690.00
38 Besi Siku 50 . 50 . 5 - L = 6 Meter Batang Rp. 269,730.00
39 Besi Siku 50 . 50 . 6 - L = 6 Meter Batang Rp. 248,920.00
40 Besi Siku 40 . 40 . 4 - L = 6 Meter Batang Rp. 146,770.00
41 Besi Siku 40 . 40 . 5 - L = 6 Meter Batang Rp. 163,150.00
42 Besi Siku 20 . 20 . 3 - L = 6 Meter Batang Rp. 111,780.00
43 Besi Plat 1.0 mm - 120 x 240 Cm Lembar Rp. 402,950.00
44 Besi Plat 1.2 mm - 120 x 240 Cm Lembar Rp. 470,486.00
45 Besi Plat 2.0 mm - 120 x 240 Cm Lembar Rp. 739,530.00
46 Besi Plat 3.0 mm - 120 x 240 Cm Lembar Rp. 1,152,406.00
47 Besi Plat 12 mm -120 x 240 cm Lembar Rp. 1,500,000.00
48 Besi Strip 20.2 Batang Rp. 61,720.00
49 Besi Strip 30.3 Batang Rp. 72,110.00
50 Besi Strip 40.4 Batang Rp. 104,910.00
51 Besi Strip 50.5 Batang Rp. 121,980.00
52 Waltermur Dia 16 mm Buah Rp. 24,350.00
53 Gording lips chanel 150.65.20.2,3 ( 6 N ) Batang Rp. 841,350.00
54 Baja profil IWF KG Rp. 21,260.00
55 Besi gording canal KG Rp. 22,809.00
56 Water mur KG Rp. 15,260.00
57 Sealent Tube Rp. 41,510.00
E. BAHAN PENUTUP ATAP
1 Seng Gelombang BJLS 0,30 Lembar Rp. 83,310.00
2 Seng Gelombang BJLS 0,22 Lembar Rp. 60,063.00
3 Seng Gelombang BJLS 0,20 Lembar Rp. 53,450.00
4 Atap Seng Plastik Gelombang Kecil Lembar Rp. 82,912.00
No. NAMA BAHAN / UPAH SATUAN HARGA SATUAN

1 2 3 4
5 Atap Seng Gelombang Besar Fiber Glass Lembar Rp. 99,803.00
6 Seng Plat BJLS 0.30 Lembar Rp. 54,060.00
7 Seng Plat BJLS 0.20 Lembar Rp. 47,450.00
8 Genteng Metal - Multiroof Lembar Rp. 61,200.00
9 Nok Genteng Metal - Multiroof Bh Rp. 39,950.00
10 Atap Allumunium Gelombang M2 Rp. 71,450.00
11 Nok Atap Allumunium M Rp. 26,450.00
12 Karet Talang M1 Rp. 14,820.00
F. BAHAN KERAMIK
1 Ubin Abu-Abu 20 x 20 Cm Buah Rp. 3,130.00
2 Ubin Abu-Abu 30 x 30 Cm Buah Rp. 7,028.00
3 Ubin Abu-Abu 40 x 40 Cm Buah Rp. 14,536.00
4 Ubin Warna 20 x 20 Cm Buah Rp. 2,910.00
5 Ubin Warna 30 x 30 Cm Buah Rp. 6,437.00
6 Ubin Warna 40 x 40 Cm Buah Rp. 11,203.00
7 Ubin Teraso Ukuran 30 x 30 cm Buah Rp. 6,800.00
8 Ubin Teraso Ukuran 40 x 40 cm Buah Rp. 14,453.00
9 Ubin Granito Ukuran 30 x 30 cm Buah Rp. 6,528.00
10 Ubin Granito Ukuran 40 x 40 cm Buah Rp. 12,536.00
11 Ubin Teralux Kerang Ukuran 30 x 30 cm Buah Rp. 7,482.00
12 Ubin Teralux Kerang Ukuran 40 x 40 cm Buah Rp. 14,620.00
13 Ubin Teralux Marmer Ukuran 30 x 30 cm Buah Rp. 11,573.00
14 Ubin Teralux Marmer Ukuran 40 x 40 cm Buah Rp. 22,453.00
15 Ubin Teralux Marmer Ukuran 60 x 60 cm Buah Rp. 73,236.00
16 Keramik Artistik 10x20; 15x15 cm Buah Rp. 1,360.00
17 Keramik Artistik 10x10 atau 5x20 cm Buah Rp. 740.00
18 Keramik Lantai 20 x 20 cm Buah Rp. 3,250.00
19 Keramik Lantai 20 x 30 cm Buah Rp. 4,242.00
20 Keramik Lantai 30 x 30 cm Buah Rp. 6,639.00
21 Keramik Lantai 30 x 30 berglasir Buah Rp. 7,502.00
22 Keramik Lantai 30 x 30 berglasir (Mozaik) Buah Rp. 7,502.00
23 Keramik Lantai 40 x 40 cm Buah Rp. 12,608.00
24 Keramik Lantai 50 x 50 cm Buah Rp. 22,873.00
25 Keramik Lantai 60 x 60 cm Buah Rp. 83,661.00
26 Keramik Dinding 10 x 20 cm Buah Rp. 1,500.00
27 Keramik Dinding 20x20 atau 20x25 cm Buah Rp. 3,140.00
28 Ubin Dinding Porselin 11 x 11 Buah Rp. 760.00
29 Ubin Dinding Porselin 10 x 20 cm Buah Rp. 1,136.00
30 Ubin Dinding Porselin 20 x 20 Buah Rp. 3,030.00
31 Plint Ubin Abu-Abu 15 x 20 cm Buah Rp. 12,660.00
32 Plint Ubin Abu-Abu 10 x 30 cm Buah Rp. 10,170.00
33 Plint Ubin Abu-Abu 10 x 40 cm Buah Rp. 12,410.00
No. NAMA BAHAN / UPAH SATUAN HARGA SATUAN

1 2 3 4
34 Plint Ubin Warna 10 x 20 cm Buah Rp. 4,600.00
35 Plint Ubin Warna 10 x 30 cm Buah Rp. 10,170.00
36 Plint Ubin Warna 10 x 40 cm Buah Rp. 12,160.00
37 Plint Ubin Teraso 10 x 30 cm Buah Rp. 10,170.00
38 Plint Ubin Teraso 10 x 40 cm Buah Rp. 12,660.00
39 Plint Ubin Granito 10 x 40 cm Buah Rp. 12,660.00
40 Plint Ubin Granito 10 x 30 cm Buah Rp. 8,170.00
41 Plint Ubin Teralux Kerang 10 x 40 cm Buah Rp. 8,160.00
42 Plint Ubin Teralux Kerang 10 x 30 cm Buah Rp. 8,170.00
43 Plint Ubin Teralux Marmer 10 x 60 cm Buah Rp. 33,680.00
44 Plint Ubin Teralux Marmer 10 x 40 cm Buah Rp. 10,160.00
45 Plint Ubin Teralux Marmer 10 x 30 cm Buah Rp. 7,670.00
46 Plint Keramik Artistik 10 x 20 cm Buah Rp. 5,100.00
47 Plint Keramik Artistik 10 x 10 cm Buah Rp. 4,590.00
48 Plint Keramik Artistik 5 x 20 cm Buah Rp. 4,090.00
49 Plint Keramik Artistik 10 x 30 cm Buah Rp. 7,670.00
50 Marmer Ukuran 100 x 100 cm Buah Rp. 358,020.00
51 Wall paper (Lebar 50 cm) M2 Rp. 250,344.00
52 Batu Paras Buah Rp. 22,937.00
53 Batu Tempel Hitam Buah Rp. 28,391.00
G. BAHAN KACA
1 Kaca Polos 3 mm M2 Rp. 117,242.00
2 Kaca Polos 5 mm M2 Rp. 165,858.00
3 Kaca Buram 3 mm M2 Rp. 109,758.00
4 Kaca Buram 4 mm M2 Rp. 110,178.00
5 Kaca Buram 5 mm M2 Rp. 176,739.00
6 Kaca Naco / Louver - 7 Clips (polos) Buah Rp. 168,056.00
7 Kaca Naco / Louver - 8 Clips (polos) Buah Rp. 198,926.00
8 Kaca Naco / Louver - 9 Clips (polos) Buah Rp. 221,870.00
9 Kaca Naco / Louver - 10 Clips (polos) Buah Rp. 249,000.00
10 Kaca Rayban 25 % - tebal 5 mm M2 Rp. 217,670.00
11 Kaca Acrylic (Kaca Plastik) - 5 mm Lembar Rp. 1,402,600.00
H. BAHAN/ALAT PENGGANTUNG
1 Kunci Tanam (Setara Cap Kuda Terbang) Set Rp. 98,100.00
2 Kunci Tanam - 2 Slaagh Set Rp. 157,750.00
3 Kunci Tanam - 1 Slaagh Set Rp. 142,850.00
4 Kunci Tanam (Setara Cap Anchor / Yale) Set Rp. 148,350.00
5 Kunci Gembok 1" Set Rp. 43,170.00
6 Engsel 4" Kuningan (Untuk Pintu) Pasang Rp. 36,920.00
7 Engsel 3" Kuningan (Untuk Jendela) Pasang Rp. 27,003.00
8 Engsel Kupu-Kupu T Pasang Rp. 18,470.00
9 Engsel Nylon Kuningan 4" Pasang Rp. 54,170.00
No. NAMA BAHAN / UPAH SATUAN HARGA SATUAN

1 2 3 4
10 Engsel Biasa 3" (Untuk Jendela) Pasang Rp. 15,770.00
11 Hak Angin / Kait Angin Buah Rp. 13,970.00
12 Espagnolet Set Rp. 65,170.00
13 Grendel Tanam (Pintu) Buah Rp. 90,170.00
14 Grendel Besar / Kecil Buah Rp. 69,420.00
15 Tarikan Pintu Buah Rp. 257,170.00
16 Tarikan Jendela Buah Rp. 16,570.00
I. BAHAN CAT
1 Amplas Kertas (Amplas Kayu) Lembar Rp. 5,416.00
2 Amplas Besi Lembar Rp. 6,100.00
3 Dempul Kayu Kg Rp. 60,833.00
4 Cat Meny Kayu Kg Rp. 68,333.00
5 Cat Meny Besi Kg Rp. 60,833.00
6 Cat Kayu Kg Rp. 64,500.00
7 Cat Besi Kg Rp. 63,500.00
8 Cat Kilat LN Kg Rp. 73,000.00
9 Minyak Cat / Thinner (Setara Lauguer) Kg Rp. 55,000.00
10 Cat Tembok (Setara Dulux Weathershield) Kg Rp. 26,250.00
11 Plamur Tembok Zak Rp. 140,600.00
12 Cat Tembok Biasa (1 Klg @ 5 Kg) Kaleng Rp. 93,416.00
13 Cat Besi Crom Kg Rp. 57,200.00
14 Cat Besi (Setara Nippon Paint) Kg Rp. 77,000.00
15 Politur Kaleng (Setara Apache) Kg Rp. 65,125.00
16 Floor Hardener KG Rp. 19,000.00
J. BAHAN LISTRIK DAN ELEKTRONIKA
1 Kabel Listrik NYM/NYA 3x2.5 mm Roll Rp. 1,442,800.00
2 Kabel Listrik NYM/NYA 2x1.5 mm Roll Rp. 839,000.00
3 Pipa Listrik dia, 5/8 Batang Rp. 27,200.00
4 Saklar Double - Tempel Buah Rp. 24,700.00
5 Saklar Tunggal / Engkel - Tempel Buah Rp. 18,500.00
6 Stop Kontak 500 Watt - Tempel Buah Rp. 27,750.00
7 Stop Kontak 1000 Watt - Tempel Buah Rp. 35,750.00
8 Home Saklar 1 Fase Komplit Buah Rp. 436,250.00
9 Lampu TL 1 x 40 Watt Komplit Buah Rp. 150,500.00
10 Lampu TL 1 x 20 Watt Komplit Buah Rp. 122,500.00
11 Lampu Pijar 40 Watt Komplit Buah Rp. 12,166.00
12 Lampu Pijar 60 Watt Komplit Buah Rp. 12,833.00
13 Lampu Pijar 100 Watt Komplit Buah Rp. 13,833.00
14 Vitting Lampu Buah Rp. 12,500.00
15 Lampu XL 40 Watt Set Rp. 86,000.00
16 Lampu XL 20 Watt Set Rp. 58,500.00
17 Lampu SL 23 Watt Set Rp. 54,625.00
No. NAMA BAHAN / UPAH SATUAN HARGA SATUAN

1 2 3 4
18 Lampu SL 14 Watt Set Rp. 43,125.00
19 Sekring Kas 1 Group (Biasa) Buah Rp. 300.00
20 Klem Kabel Dus Rp. 21,800.00
21 Isolasi Listrik Buah Rp. 10,125.00
22 Sekrup Dus Rp. 34,575.00
23 Panil Distribusi Buah Rp. 12,500,000.00
K. BAHAN PIPA DAN SANITAIR
1 Pipa GIP (Leideng) Dia. 1/2" - 6 Meter Batang Rp. 130,666.00
2 Pipa GIP (Leideng) Dia. 3/4" - 6 Meter Batang Rp. 160,250.00
3 Pipa GIP (Leideng) Dia. 1" - 6 Meter Batang Rp. 207,250.00
4 Pipa GIP (Leideng) Dia. 1.25" - 6 Meter Batang Rp. 305,666.00
5 Pipa GIP (Leideng) Dia. 1.5" - 6 Meter Batang Rp. 351,666.00
6 Pipa GIP (Leideng) Dia. 2" - 6 Meter Batang Rp. 466,666.00
7 Pipa GIP (Leideng) Dia. 3" - 6 Meter Batang Rp. 808,666.00
8 Pipa GIP (Leideng) Dia. 4" - 6 Meter Batang Rp. 1,064,333.00
9 Pipa PVC Dia. 5" - 4 Meter (AW) Batang Rp. 635,000.00
10 Pipa PVC Dia. 4" - 4 Meter (AW) Batang Rp. 337,625.00
11 Pipa PVC Dia. 4" - 4 Meter (D) Batang Rp. 185,300.00
12 Pipa PVC Dia. 3" - 4 Meter (D) Batang Rp. 131,200.00
13 Pipa PVC Dia. 2" - 4 Meter (D) Batang Rp. 65,900.00
14 Pipa PVC Dia. 1" - 4 Meter (D) Batang Rp. 47,625.00
15 Pipa PVC Dia. 1/2" - 4 M Batang Rp. 28,700.00
16 Pipa PVC Dia. 3/4" - 4 M Batang Rp. 34,700.00
17 Pipa PVC Dia. 2,5" - 4 M Batang Rp. 112,600.00
18 Talang PVC Oval 6" - 4 Meter Batang Rp. 80,250.00
19 Talang PVC Oval 8" - 4 Meter Batang Rp. 107,000.00
20 Talang PVC Kotak 4" - 4 Meter Batang Rp. 134,200.00
21 Talang PVC Kotak 8" - 4 Meter Batang Rp. 395,000.00
22 Closed Duduk Porselin Komplit Buah Rp. 1,784,400.00
23 Closet duduk (siram) Buah Rp. 600,000.00
24 Closed Jongkok Porselin (Standar) Buah Rp. 197,000.00
25 Closed Jongkok Fiber Glass / Plastik Buah Rp. 87,200.00
26 Urinoir Buah Rp. 1,547,500.00
27 Wastafel Porselin Buah Rp. 556,250.00
28 Bak Air / Fiber Glass 1 M3 Buah Rp. 378,666.00
29 Bak Air / Fiber Glass 1/2 M3 Buah Rp. 395,000.00
30 Bak Air / Fiber Glass 1/4 M3 Buah Rp. 295,000.00
31 Tangki Air / Fiber Glass 1 M3 Buah Rp. 1,970,000.00
32 Kran Air 3/4" Buah Rp. 33,000.00
33 Kran Air 1/2" Buah Rp. 30,300.00
34 Kran Air 1" Buah Rp. 22,166.00
35 Stop Kran 1/2" Buah Rp. 17,000.00
No. NAMA BAHAN / UPAH SATUAN HARGA SATUAN

1 2 3 4
36 Doble Neple GIP 1/2" Buah Rp. 15,160.00
37 Soccet 1/2" Buah Rp. 2,160.00
38 Elbow GIP 90º x 1/2" ( PE ) Buah Rp. 50,160.00
39 Tee 1/2" x 1/2" Buah Rp. 2,410.00
40 Hand Kran 1/2" Besi Buah Rp. 30,160.00
41 Dop GIP 1/2" Buah Rp. 6,660.00
42 Water Meter 1/2" Buah Rp. 451,170.00
43 Clamp Sadle 2" mm x 1/2" ( PE ) Buah Rp. 81,170.00
44 Pengaman Box Meter Buah Rp. 251,170.00
45 Pipa HDPE Ø 150 mm M Rp. 400,040.00
46 Pipa HDPE Ø 100 mm M Rp. 196,780.00
47 Pipa HDPE Ø 75 mm M Rp. 107,360.00
48 Pipa HDPE Ø 50-63 mm M Rp. 60,140.00
49 Tee All Flange Ø 50 x 50 mm (HDPE) Buah Rp. 455,420.00
50 Tee All Flange Ø 75 x 50 mm (HDPE) Buah Rp. 480,520.00
51 Tee All Flange Ø 75 x 75 mm (HDPE) Buah Rp. 505,600.00
52 Tee All Flange Ø 100 x 75 mm (HDPE) Buah Rp. 655,690.00
53 Bend 90 All Flange Ø 50 mm (HDPE) Buah Rp. 211,480.00
54 Bend 90 All Flange Ø 75 mm (HDPE) Buah Rp. 339,890.00
55 Bend 90 All Flange Ø 100 mm (HDPE) Buah Rp. 55,030.00
56 Gate Valve Flange Ø 50 mm Buah Rp. 1,862,720.00
57 Gate Valve Flange Ø 75 mm Buah Rp. 2,363,380.00
58 Gate Valve Flange Ø 1/2" Buah Rp. 200,170.00
59 Stub Flange Ø 50 mm Buah Rp. 201,050.00
60 Stub Flange Ø 75 mm Buah Rp. 602,040.00
61 Stub Flange Ø 100 mm Buah Rp. 842,540.00
62 End Cap (Dop) Ø 50 mm (HDPE) Buah Rp. 37,269.00
63 End Cap (Dop) Ø 75 mm (HDPE) Buah Rp. 87,923.00
64 Stop Cock (PIT Kran) 1/2" Buah Rp. 950,380.00
65 Reducer Ø 75 x 75 mm (HDPE) Buah Rp. 528,770.00
66 Reducer Ø 75 x 50 mm (HDPE) Buah Rp. 503,730.00
67 Quil Elbow HDPE (adaptor) Ø15 (1/2") Buah Rp. 49,480.00
68 Pipa Input HDPE Ø 1/2" Buah Rp. 39,880.00
M. BETON PRACETAK
1 Dwiker Sumur/Gorong2 Ø 1 m, H 60 cm Buah Rp. 472,180.00
2 Dwiker Sumur/Gorong2 Ø 0,8 m, H 60 cm Buah Rp. 415,180.00
3 Dwiker/Gorong2 Ø 0,6 m, H 80 cm Buah Rp. 377,120.00
4 Dwiker/Gorong2 Ø 0,4 m, H 80 cm Buah Rp. 368,270.00
N. BAHAN BANGUNAN LAIN
1 Lem Aica Aibon KG Rp. 49,500.00
2 Lem Fox KG Rp. 53,166.00
3 Lem Vinyl KG Rp. 20,000.00
No. NAMA BAHAN / UPAH SATUAN HARGA SATUAN

1 2 3 4
4 Ijuk KG Rp. 45,380.00
5 Pipa Plastik dia, 3" (AW) Batang Rp. 151,290.00
6 Mata bor Buah Rp. 18,060.00
7 Mata gurinda Buah Rp. 18,060.00
8 Gas elpiji KG Rp. 23,830.00
9 Oksigen (@50 kg/btl) KG Rp. 250,520.00
10 Kuas Cat Minyak Buah Rp. 350,630.00
11 Kuas Roll (Cat Tembok) Buah Rp. 22,080.00
12 Air Bersih Liter Rp. 33,580.00

No. NAMA BAHAN / UPAH SATUAN HARGA SATUAN


1 2 3 4

1 Mandor Bangunan / Lapangan OH Rp. 213,000.00


2 Kepala Tukang (Batu, Pasir, Kayu, dsb) OH Rp. 202,000.00
3 Tukang (Batu, Pasir, Kayu, dsb) OH Rp. 194,000.00
4 Pekerja OH Rp. 152,000.00
5 Mandor Alat Berat (F. Equipment) (*) OH Rp. 233,000.00
6 Operator Alat Berat (*) OH Rp. 194,000.00
7 Pembantu Operator (*) OH Rp. 152,000.00
8 Sopir / Driver (*) OH Rp. 194,000.00
9 Pembantu Sopir / Driver (*) OH Rp. 152,000.00
10 Mekanik (*) OH Rp. 194,000.00
11 Pembantu Mekanik (*) OH Rp. 152,000.00
12 Surveyor OH Rp. 202,000.00
13 Pembantu Surveyor OH Rp. 152,000.00
BEKAP DATA KEBUTUHAN BAHAN

TUGAS BESAR : MENEJEMEN KONTRUKSI DAN ESTIMASI BIAYA


DIBUAT OLEH : AGUS PUTRA LAKSONO
NPM : 2018-22-201-003
JURUSAN : TEKNIK SIPIL
DIPERIKSA OLEH : ….........................
DISETUJUI OLEH : YANCE KAKERISSA,S.T.,M.T

No. URAIAN PEKERJAAN VOL SAT BAHAN ANALISA

A B C D E F G
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 375.00 M2

3 Gudang Semen dan Peralatan 28.00 M2


Kayu dolken Ø 8-10, P. 400 cm - Kayu Kelas 3 Btg 1.7000
Balok Kayu Bus M3 0.2100
Paku Biasa Campur 2" - 5" KG 0.3000
Semen Portland (PC) @ 50 Kg KG 10.5000
Pasir Semen (import) M3 0.0300
Kerikil/batu pecah (import) M3 0.0500
Seng Gelombang BJLS 0,20 Lbr 1.5000
Seng Plat BJLS 0.20 Lbr 0.2500

4 Pengukuran dan Pemasangan Bouwplank 45.75 M1 Balok Kayu Bus M3 0.0120


Kayu Papan Bus M3 0.0070
Paku Biasa Campur 2" - 5" KG 0.0200
II. PEKERJAAN TANAH DAN PASIR
1 Galian Tanah Pondasi 43.78 M3
2 Urugan Tanah Kembali 14.59 M3
3 Urugan Tanah Peninggian Lantai 149.10 M3 Tanah timbun biasa M3 1.2000
4 Urugan Pasir Bawah Pondasi 13.54 M3 Pasir semen (lokal) M3 1.2000
5 Urugan Pasir Bawah Lantai 13.40 M3 Pasir semen (lokal) M3 1.2000
III. PEKERJAAN PONDASI BETON
DAN PASANGAN
1 Lantai Kerja Tebal 10 cm 3.46 M3 Semen Portland (PC) @ 50 Kg KG 384.0000
Pasir semen (import) M3 0.4943
Kerikil/batu pecah (import) M3 0.7696
Air Liter 215.0000

2 Pondasi Poer B. Bertulang 10.44 M3 Kayu Bekisting Kelas 3 M3 0.20


Paku Campur Biasa KG 1.5000
Minyak Bekisting Liter 0.4000
Besi tulangan beton dia. 12 mm KG 157.0000
Kawat ikat besi beton KG 2.2500
Semen Portland (PC) @ 50 Kg KG 336.0000
Pasir semen (import) M3 0.5400
Kerikil/batu pecah (import) M3 0.8100
Pekerja OH 5.3000
Tukang Batu OH 0.2750
Tukang Kayu OH 1.30
Tukang Besi OH 1.05
Kepala Tukang OH 0.2620
Mandor OH 0.2650

3 Pas. Pondasi Batu Bata 41.90 M3 Batu bata Bh 649.0000


Semen Portland (PC) @ 50 Kg Zak 5.7737
Pasir semen (import) M3 0.4124

4 Sloof B.Bertulang 20 x 30 cm 7.56 M3 Kayu Bekisting Kelas 3 M3 0.2700


Paku Campur Biasa KG 2.0000
Minyak Bekisting Liter 0.6000
Besi tulangan beton dia. 12 mm KG 210.0000
Kawat ikat besi beton KG 3
Semen Portland (PC) @ 50 Kg KG 336.0000
Pasir semen (import) M3 0.5400
Kerikil/batu pecah (import) M3 0.81
No. URAIAN PEKERJAAN VOL SAT BAHAN ANALISA

A B C D E F G
5 Kolom Utama 15 x 25 B. Bertulang 6.19 M3 Kayu Bekisting Kelas 3 M3 0.4000
Paku Campur Biasa KG 4.0000
Minyak Bekisting Liter 2.0000
Besi tulangan beton dia. 12 mm KG 315.0000
Kawat ikat besi beton KG 4.5000
Semen Portland (PC) @ 50 Kg KG 336.0000
Pasir semen (import) M3 0.5400
Kerikil/batu pecah (import) M3 0.8100
Balok Kayu Kelas 2 M3 0.1500
Plywood 9 mm Lbr 3.5000
Kayu dolken Ø 8-10, P. 400 cm - Kayu Kelas 3 Btg 20.0000
6 Kolom Praktis 15 x 15 B. Bertulang 2.54 M3 Begisting beton (kolom)
Kayu Bekisting Kelas 3 M3 0.0400
Paku Campur Biasa 5 cm - 10 cm KG 0.4000
Minyak Bekisting/oli bekas Liter 0.2000
Balok Kayu Kelas 2 M3 0.0150
Plywood 9 mm Lbr 0.3500
Kayu dolken Ø 8-10, P. 400 cm - Kayu Kelas 3 Btg 2.0000
Tulangan Sengkang (polos) Dia. 8 mm KG 65.9935
Tulangan Utama (polos) Dia. 10 mm KG 109.9349
Campuran Beton 1PC : 3PS (import)
Semen Portland (PC) @ 50 Kg Zak 11.3625
Pasir semen (import) M3 1.2174

7 Balok Utama 20 x 30 cm B. Bertulang 8.01 M3 Kayu Bekisting Kelas 3 M3 0.3200


Paku Campur Biasa KG 3.2000
Minyak Bekisting Liter 1.6000
Besi tulangan beton dia. 12 mm KG 210.0000
Kawat ikat besi beton KG 3.0000
Semen Portland (PC) @ 50 Kg KG 336.0000
Pasir semen (import) M3 0.5400
Kerikil/batu pecah (import) M3 0.8100
Balok Kayu Kelas 2 M3 0.1400
Plywood 9 mm Lbr 2.8000
Kayu dolken Ø 8-10, P. 400 cm - Kayu Kelas 3 Btg 16.0000
8 Ring Balk 20 x 30 cm B. Bertulang 6.03 M3 Kayu Bekisting Kelas 3 M3 0.3200
Paku Campur Biasa KG 3.2000
Minyak Bekisting Liter 1.6000
Besi tulangan beton dia. 10 mm KG 210.0000
Kawat ikat besi beton KG 3.0000
Semen Portland (PC) @ 50 Kg KG 336.0000
Pasir semen (import) M3 0.5400
Kerikil/batu pecah (import) M3 0.8100
Balok Kayu Kelas 2 M3 0.1400
Plywood 9 mm Lbr 2.8000
Kayu dolken Ø 8-10, P. 400 cm - Kayu Kelas 3 Btg 16.0000
9 Cor Plat Lantai Tebal 5 cm 6.10 M3 Kayu Bekisting Kelas 3 M3 0.3200
Paku Campur Biasa KG 3.2000
Minyak Bekisting Liter 1.6000
Besi tulangan beton dia. 12 mm KG 157.5000
Kawat ikat besi beton KG 2.2500
Semen Portland (PC) @ 50 Kg KG 336.0000
Pasir semen (import) M3 0.5400
Kerikil/batu pecah (import) M3 0.8100
Balok Kayu Kelas 2 M3 0.1200
Plywood 9 mm Lbr 2.8000
Kayu dolken Ø 8-10, P. 400 cm - Kayu Kelas 3 Btg 32.0000
10 Cor Tangga Beton B. Bertulang 3.02 M3 Kayu Bekisting Kelas 3 M3 0.2500
Paku Campur Biasa KG 3.0000
Minyak Bekisting Liter 1.2000
Besi tulangan beton dia. 10 mm KG 200.0000
Kawat ikat besi beton KG 3.0000
Semen Portland (PC) @ 50 Kg KG 323.0000
Pasir semen (import) M3 0.5200
Kerikil/batu pecah (import) M3 0.7800
Balok Kayu Kelas 2 M3 0.1050
Plywood 9 mm Lbr 2.5000
Kayu dolken Ø 8-10, P. 400 cm - Kayu Kelas 3 Btg 14.0000
No. URAIAN PEKERJAAN VOL SAT BAHAN ANALISA

A B C D E F G
11 Cor Plat Dak Tebal 12 cm 3.12 M3
Kayu Bekisting Kelas 3 M3 0.3200
Paku Campur Biasa KG 3.2000
Minyak Bekisting Liter 1.6000
Besi tulangan beton dia. 10 mm KG 157.5000
Kawat ikat besi beton KG 2.2500
Semen Portland (PC) @ 50 Kg KG 336.0000
Pasir semen (import) M3 0.5400
Kerikil/batu pecah (import) M3 0.8100
Balok Kayu Kelas 2 M3 0.1200
Plywood 9 mm Lbr 2.8000
Kayu dolken Ø 8-10, P. 400 cm - Kayu Kelas 3 Btg 32.0000

IV. PEKERJAAN PASANGAN DAN PLESTERAN

1 Pas. Dinding 1/2 Bata 67.89 M3 Batu bata Bh 70.0000


Semen Portland (PC) @ 50 Kg Zak 0.4625
Pasir semen (import) M3 0.0495
2 Plesteran Tebal 20 mm 1357.75 M2 Semen Portland (PC) @ 50 Kg KG 7.7760
Pasir semen (import) M3 0.0230

3 Cor Lantai, Tebal : 5 cm 6.10 M3 Semen Portland (PC) @ 50 Kg Zak 15.1500


Pasir semen (import) M3 1.0821

V. PEKERJAAN LANTAI DAN DINDING

1 Pas. Lantai Keramik Uk. 60 x 60 cm 256.50 M2 Ubin Keramik Ukuran 40 x 40 Bh 3.1000


Semen Portland (PC) @ 50 Kg KG 9.6000
Pasir Semen (lokal) M3 0.0450
Semen Warna KG 1.5000

2 Pas. Lantai Keramik Tangga 5.08 M2 Keramik Lantai 30 x 30 cm Bh 26.5000


Uk. 30 x 30 cm Semen Portland (PC) @ 50 Kg KG 10.4000
Pasir Semen (lokal) M3 0.0450
Semen Warna KG 1.6200

3 Pas. Lantai Keramik KM/WC 17.25 M2 Ubin Keramik Ukuran 25 x 25 Bh 26.5000


Uk. 25 x 25 cm Semen Portland (PC) @ 50 Kg KG 10.4000
Pasir Semen (lokal) M3 0.0450
Semen Warna KG 1.6200

4 Pas. Dinding Keramik KM/WC 51.17 M2 Ubin Keramik Ukuran 20 x 20 Bh 26.5000


UK. 20 x 20 cm, tinggi : 1,5 m Semen Portland (PC) @ 50 Kg KG 9.3000
Pasir Semen (lokal) M3 0.0180
Semen Warna KG 1.9400

VI. PEKERJAAN ATAP


1 Pas. Rangka Kuda-kuda & Skor 2.68 M3 Balok Kayu Kelas II (Kayu Rahay) M3 1.1000
UK. Skor 5/8 cm (Kayu Klas II ) Paku Campuran KG 5.6000

2 Pas. Gording 5/8 cm ( Kayu Klas II ) 2.50 M3 Balok Kayu Kelas II (Kayu Rahay) M3 1.1000
Paku Campuran KG 3.0000

3 Pas. Atap Seng Gelombang 294.53 M2 Seng Gelombang BJLS 0,20 Lbr 0.7000
BJLS 0.20 mm Paku Seng KG 0.0200

4 Pas. Lisplank Kayu Kelas II 71.40 M1 Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm M3 0.0046
Paku Campuran KG 0.0600

VII. PEKERJAAN PLAFOND

1 Pas. Rangka Plafond Kayu 5/5 cm 248.00 M2 Balok Kayu Kelas II (Kayu Rahay) M3 0.0130
Paku Campuran KG 0.1200

2 Pas. Plafond Gypsum t : 9 mm 248.00 M2 Triplek ukuran (120 x 240) cm tebal 4 mm Lbr 0.3640
Paku Triplek KG 0.1100

No. URAIAN PEKERJAAN VOL SAT BAHAN ANALISA

A B C D E F G
VIII. PEKERJAAN KUSEN PINTU DAN JENDELA
1 1 M3 Kusen Pintu dan Jendela Kayu Kelas II 1.52 M3
Balok Kayu Kelas II (Kayu Rahay) M3 1.2000
Paku Campuran KG 1.2500
Lem Kayu KG 1.0000

2 Luasan Jendela ( J1) 3.36 Bh Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm M3 0.0240
Kaca Rayben 5 mm M2 1.0000
Lem Kayu KG 0.3000

3 Luasan Jendela ( J2) 3.11 Bh Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm M3 0.0240
Kaca Rayben 5 mm M2 1.0000
Lem Kayu KG 0.3000

4 Luasan Jendela (J3) 1.60 Bh Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm M3 0.0240
Kaca Rayben 5 mm M2 1.0000
Lem Kayu KG 0.3000

### 5 Luasan Ventilasi (V1) 0.80 Bh Balok kayu Rahay M3 0.0042


Paku Campuran M2 0.1500

6 Luasan Ventilasi (V2) 0.30 Bh Balok kayu Rahay M3 0.0042


Paku Campuran M2 0.1500

7 Luasan Pintu (P1) 3.57 Bh Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm M3 0.0400
Lem Kayu KG 0.5000

8 Luasan Pintu (P2) 1.68 Bh Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm M3 0.0400
Lem Kayu KG 0.5000

9 Luasan Pintu (P3) 1.47 Bh Papan Kayu Kelas II (Kayu Rahay) tebal = 2 Cm M3 0.0400
Lem Kayu KG 0.5000

IX. PEKERJAAN PENGECATAN


1 Cat Meny Kayu 75.01 M2 Cat meny kayu KG 0.1700
Minyak Cat Liter 0.1000
Kuas Bh 0.0150

2 Cat Kilap Kayu 75.01 M2 Cat dasar/cat kayu KG 0.1700


Minyak Cat Liter 0.1000
Amplas Bh 1.0000
Kuas Bh 0.0150

3 Cat Tembok untuk Dinding 1357.75 M2 Plamur KG 0.1000


Cat dasar KG 0.1000
Cat penutup 2 kali KG 0.2600

4 Cat Plafon 248.00 M2 Plamur KG 0.1000


Cat Tembok (Setara Dulux Weathershield) KG 0.4700
Kertas amplas (kayu) Lbr 0.5000
Kuas roll Bh 0.0100
Kapek Bh 0.0500
X. PEKEKERJAAN INSTALASI LISTRIK
1 Lampu XL 23 Watt 23.00 Titik Vetting lampu Bh 1.0000
Kabel NYA 2x1,5 mm M 7.0000
Saklar Bh 1.0000
Lampu SL 23 VA Bh 1.0000
Klem Kabel Dos 0.2000
Isolasi Bh 0.1000
Sekrup Dos 0.1000
2 Lampu XL 14 Watt 10.00 Titik Vetting lampu Bh 1.0000
Kabel NYA 2x1,5 mm M 7.0000
Saklar Bh 1.0000
Lampu SL 14 VA Bh 1.0000
Klem Kabel Dos 0.2000
Isolasi Bh 0.1000
Sekrup Dos 0.1000
No. URAIAN PEKERJAAN VOL SAT BAHAN ANALISA

A B C D E F G
3 Saklar Ganda 6 Titik Saklar Ganda Bh 1.0000

4 Saklar Tunggal 13 Titik Saklar Tunggal Bh 1.0000

5 Stop Kontak 12 Titik Stop Kontak Bh 1.0000


Kabel NYA 3x2.5 mm M 3.0000
Klem Kabel Dos 0.2000
Isolasi Bh 0.1000
Sekrup Dos 0.1000

6 Sekring Case 1 Bh Panel Box Bh 1.0000


XI. PEKEKERJAAN SANITASI
1 Bak air 10.00 Unit Batu Bata Bh 371.0000
Semen Portland (PC) @ 50 Kg KG 114.0000
Pasir semen (lokal) M3 0.1840
Kerikil/batu pecah (import) M3 0.0330
Besi tulangan beton dia. 10 mm KG 4.8500
Pasir semen (import) M3 0.1200
2 Pasangan Closet Jongkok Porcelin 10.00 Bh Closet jongkok porselin Buah 1.0000
Semen Portland (PC) @ 50 Kg KG 6.0000
Pasir semen (lokal) M3 0.0100

3 1 Unit Septictank 2.00 Unit Semen Portland (PC) @ 50 Kg Zak 6.0000


2 x (1 x 1) dalam 1,5 M + Resapan Pasir semen (lokal) M3 2.5000
Batu bata Buah 1216.0000
Besi beton dia 10 mm KG 112.4000
Kawat ikat beton KG 0.5000
Papan begisting kayu bus M3 0.0880
Besi Pipa Dia 2" PVC M 2.0000
Paku 2" KG 0.1000

4 Memasang Pipa PVC Tipe AW Dia. 3/4" 18.00 M1 Pipa PVC Tipe AW Dia. 3/4" M 1.2000

5 Memasang Pipa PVC Tipe AW Dia. 4" 19.00 M1 Pipa PVC Tipe AW Dia. 4" M1 1.2000

6 Kran air Dia. 3/4" atau 1/2" 10.00 BH Kran air Dia. 3/4" atau 1/2" BH 1.2000
Seal Tape Buah 0.0250

7 Pompa dragon/pompa tangan 1.00 Unit Pompa Dragon Buah 1.0000


Shock ulir Buah 1.0000
L Bough 2" Buah 2.0000
Pipa PVC dia 1" ( D ) Btg 2.0000
Lem PVC Buah 0.1000
VOL. SAT.

CxG= H

47.60 Btg
5.88 M3
8.40 KG
294.00 KG
0.84 M3
1.40 M3
42.00 Lbr
7.00 Lbr

0.55 M3
0.32 M3
0.92 KG

178.92 M3
16.24 M3
16.08 M3

1,327.10 KG 26.54
1.71 M3
2.66 M3
743.04 Liter

2.09 M3
15.66 KG
4.18 Liter
1,639.08 KG
23.49 KG
3,507.84 KG 70.16
5.64 M3
8.46 M3
55.33 OH
2.87 OH
13.57 OH
10.96 OH
2.74 OH
2.77 OH

27,189.86 Bh
241.89 Zak
17.28 M3

2.04 M3
15.12 KG
4.54 Liter
1,587.60 KG
22.68 KG
2,540.16 KG 50.80
4.08 M3
6.12 M3
VOL. SAT.

CxG= H
2.48 M3
24.75 KG
12.38 Liter
1,949.06 KG
27.84 KG
2,079.00 KG 41.58
3.34 M3
5.01 M3
0.93 M3
21.66 Lbr
123.75 Btg

0.10 M3
1.02 KG
0.51 Liter
0.04 M3
0.89 Lbr
5.09 Btg
167.79 KG
279.51 KG

28.89 Zak
3.10 M3

2.56 M3
25.63 KG
12.82 Liter
1,682.10 KG
24.03 KG
2,691.36 KG 53.83
4.33 M3
6.49 M3
1.12 M3
22.43 Lbr
128.16 Btg
1.93 M3
19.30 KG
9.65 Liter
1,266.30 KG
18.09 KG
2,026.08 KG 40.52
3.26 M3
4.88 M3
0.84 M3
16.88 Lbr
96.48 Btg
1.95 M3
19.52 KG
9.76 Liter
960.75 KG
13.73 KG
2,049.60 KG 40.99
3.29 M3
4.94 M3
0.73 M3
17.08 Lbr
195.20 Btg
0.76 M3
9.07 KG
3.63 Liter
604.80 KG
9.07 KG
976.75 KG 19.54
1.57 M3
2.36 M3
0.32 M3
7.56 Lbr
42.34 Btg
VOL. SAT.

CxG= H

1.00 M3
9.98 KG
4.99 Liter
491.40 KG
7.02 KG
1,048.32 KG
1.68 M3
2.53 M3
0.37 M3
8.74 Lbr
99.84 Btg

4,752.13 Bh
31.39 Zak
3.36 M3
10,557.88 KG
31.23 M3

92.42 Zak
6.60 M3

795.15 Bh
2,462.40 KG 49.25
11.54 M3
384.75 KG

134.62 Bh
52.83 KG 1.06
0.23 M3
8.23 KG

457.13 Bh
179.40 KG 3.59
0.78 M3
27.95 KG

1,355.95 Bh
475.86 KG 9.52
0.92 M3
99.27 KG

2.95 M3
15.01 KG

2.75 M3
7.50 KG

206.17 Lbr
5.89 KG

0.33 M3
4.28 KG

3.22 M3
29.76 KG

90.27 Lbr
27.28 KG

VOL. SAT.

CxG= H

1.82 M3
1.90 KG
1.52 KG

0.07 M3
3.11 M2
0.93 Bh

0.07 M3
3.11 M2
0.93 Bh

0.04 M3
1.60 M2
0.48 Bh

0.00 M3
0.12 KG

0.00 M3
0.05 KG

0.14 M3
1.79 Bh

0.07 M3
0.84 Bh

0.06 M3
0.74 Bh

12.75 KG
7.50 Liter
1.13 Bh

12.75 KG
7.50 Liter
75.01 Bh
1.13 Bh

135.78 KG
135.78 KG
353.02 KG

24.80 KG
116.56 KG
124.00 Lbr
2.48 Bh
12.40 Bh

23.00 Bh
161.00 M
23.00 Bh
23.00 Bh
4.60 Dos
2.30 Bh
2.30 Dos
10.00 Bh
70.00 M
10.00 Bh
10.00 Bh
2.00 Dos
1.00 Bh
1.00 Dos
VOL. SAT.

CxG= H
6.00 Bh

13.00 Bh

12.00 Bh
36.00 M
2.40 Dos
1.20 Bh
1.20 Dos

1.00 Bh

3,710.00 Bh
1,140.00 KG 22.80
1.84 M3
0.33 M3
48.50 KG
1.20 M3
10.00 Buah
60.00 KG 1.20
0.10 M3

12.00 Zak
5.00 M3
2,432.00 Buah
224.80 KG
1.00 KG
0.18 M3
4.00 M
0.20 KG

21.60 M

22.80 M1

12.00 BH
0.25 Buah

1.00 Buah
1.00 Buah
2.00 Buah
2.00 Btg
0.10 Buah
TOTAL KEBUTUHAN BAHAN
TUGAS BESAR : MENEJEMEN KONTRUKSI DAN ESTIMASI BIAYA
DIBUAT OLEH : AGUS PUTRA LAKSONO
NPM : 2018-22-201-003
JURUSAN : TEKNIK SIPIL
DIPERIKSA OLEH : ….........................
DISETUJUI OLEH : YANCE KAKERISSA,S.T.,M.T

No. NAMA BAHAN / UPAH SAT Total Bahan Harga Bahan Total ( Rp )

a b c d e dxe=
A. BAHAN BAKAR DAN PENCAMPUR
1 Minyak Bekisting / Oli Bekas Liter 57.45 Rp. 907.00 Rp. 52,105.61
JUMLAH Rp. 52,105.61
B. BAHAN PASIR, BATU DAN SEMEN Rp.
1 Pasir Semen (Import) M3 91.31 Rp. 1,158,663.00 Rp. 105,795,716.51
2 Pasir Pasang Lokal (kualitas baik) M3 52.73 Rp. 745,150.00 Rp. 39,292,932.37
3 Tanah Timbun biasa M3 178.92 Rp. 259,070.00 Rp. 46,352,804.40
4 Batu Kerikil/Koral beton (Import) M3 41.25 Rp. 1,162,560.00 Rp. 47,960,058.42
5 Batu Bata Merah Bh 34373.99 Rp. 1,350.00 Rp. 46,404,882.45
6 Semen Portland (PC) @ 50 Kg Zak 869.18 Rp. 103,170.00 Rp. 89,673,592.64
7 Semen PC Putih / Warna Zak 10.40 Rp. 135,670.00 Rp. 1,411,484.96
JUMLAH Rp. 376,891,471.73
C. BAHAN KAYU, TRIPLEKS DLL
1 Balok Kayu Kelas III (Kayu Bus) M3 6.43 Rp. 2,905,260.00 Rp. 18,677,916.54
2 Balok Kayu Kelas II (Kayu Rahay) M3 8.92 Rp. 4,179,150.00 Rp. 37,281,779.24
3 Papan Kayu Kelas III (Kayu Bus) t : 2-5 cm M3 11.52 Rp. 2,095,260.00 Rp. 24,135,195.18
4 Papan Kayu Kelas II (Kayu Rahay) t : 2 cm M3 0.47 Rp. 4,179,150.00 Rp. 1,969,382.65
5 Tripleks (1,22 x 2,44) cm - tebal 4 mm Lbr 90.27 Rp. 83,140.00 Rp. 7,505,214.08
6 Plywood - Multiplex Lbr 86.50 Rp. 453,770.00 Rp. 39,250,254.18
7 Kayu dolken Ø 8-10, L=4 M Btg 690.85 Rp. 17,020.00 Rp. 11,758,284.02
JUMLAH Rp. 140,578,025.88
D. BAHAN BESI, PAKU DAN KAWAT
1 Besi Beton Dia.8 mm (SNI) Kg 167.79 Rp. 11,890.00 Rp. 1,995,003.58
2 Besi Beton Dia.10 mm (SNI) Kg 2423.91 Rp. 11,890.00 Rp. 28,820,283.79
3 Besi Beton Dia.12 mm (SNI) Kg 7818.59 Rp. 12,168.00 Rp. 95,136,633.54
4 Kawat Beton KG 139.93 Rp. 25,250.00 Rp. 3,533,251.44
5 Paku 2" (5 cm) KG 10.53 Rp. 21,110.00 Rp. 222,330.52
6 Paku 5" (12 - 15 cm) KG 1396.17 Rp. 20,643.00 Rp. 28,821,116.67
7 Paku Campur KG #REF! Rp. 20,976.00 Rp. #REF!
8 Paku Seng KG 5.89 Rp. 37,350.00 Rp. 220,010.18
JUMLAH Rp. #REF!
E. BAHAN PENUTUP ATAP
1 Seng Gelombang BJLS 0,20 Lbr 206.17 Rp. 53,450.00 Rp. 11,019,652.88
2 Seng Plat BJLS 0.20 Lbr 206.17 Rp. 47,450.00 Rp. 9,782,647.88
JUMLAH Rp. 20,802,300.75
F. BAHAN KERAMIK
1 Keramik Lantai 20 x 20 cm Bh 1355.95 Rp. 3,250.00 Rp. 4,406,844.00
2 Keramik Lantai 25 x 25 cm Bh 591.75 Rp. 4,242.00 Rp. 2,510,182.29
3 Keramik Lantai 40 x 40 cm Bh 795.15 Rp. 12,608.00 Rp. 10,025,251.20
JUMLAH Rp. 16,942,277.49
G. BAHAN KACA
1 Kaca Polos 5 mm M2 3.11 Rp. 165,858.00 Rp. 515,486.66
JUMLAH Rp. 515,486.66
H. BAHAN/ALAT PENGGANTUNG
1 Kunci Tanam (Setara Cap Kuda Terbang) Set 0.07 Rp. 98,100.00 Rp. 6,592.32
2 Kunci Tanam - 2 Slaagh Set #REF! Rp. 157,750.00 Rp. #REF!
3 Engsel 4" Kuningan (Untuk Pintu) Psg #REF! Rp. 36,920.00 Rp. #REF!
4 Engsel 3" Kuningan (Untuk Jendela) Psg 0.93 Rp. 27,003.00 Rp. 25,177.60
5 Hak Angin / Kait Angin Buah #REF! Rp. 13,970.00 Rp. #REF!
6 Grendel Besar / Kecil Buah #REF! Rp. 90,170.00 Rp. #REF!
JUMLAH Rp. #REF!
No. NAMA BAHAN / UPAH SAT VOLUME Harga Bahan Total ( Rp )

a b c d e dxe
I. BAHAN CAT
1 Amplas Kertas (Amplas Kayu) Lbr 75.01 Rp. 5,416.00 Rp. 406,264.99
2 Cat Meny Kayu Kg 12.75 Rp. 68,333.00 Rp. 871,385.15
3 Cat Kayu Kg 12.75 Rp. 64,500.00 Rp. 822,506.58
4 Minyak Cat / Thinner (Setara Lauguer) Kg 15.00 Rp. 55,000.00 Rp. 825,132.00
5 Cat Tembok (Setara Dulux Weathershield) Kg 116.56 Rp. 26,250.00 Rp. 3,059,700.00
6 Plamur Tembok Zak 24.80 Rp. 140,600.00 Rp. 3,486,880.00
JUMLAH Rp. 9,471,868.72
J. BAHAN LISTRIK DAN ELEKTRONIKA
1 Kabel Listrik NYM/NYA 3x2.5 mm Roll 15.00 Rp. 1,442,800.00 Rp. 21,642,000.00
2 Kabel Listrik NYM/NYA 2x1.5 mm Roll 15.00 Rp. 839,000.00 Rp. 12,585,000.00
4 Saklar Double - Tempel Bh 6.00 Rp. 24,700.00 Rp. 148,200.00
5 Saklar Tunggal / Engkel - Tempel Bh 13.00 Rp. 18,500.00 Rp. 240,500.00
7 Stop Kontak 1000 Watt - Tempel Bh 12.00 Rp. 35,750.00 Rp. 429,000.00
13 Vitting Lampu Bh 10.00 Rp. 12,500.00 Rp. 125,000.00
16 Lampu SL 23 Watt Set 23.00 Rp. 54,625.00 Rp. 1,256,375.00
17 Lampu SL 14 Watt Set 10.00 Rp. 43,125.00 Rp. 431,250.00
19 Klem Kabel Dus 9.00 Rp. 21,800.00 Rp. 196,200.00
20 Isolasi Listrik Bh 4.50 Rp. 10,125.00 Rp. 45,562.50
21 Sekrup Dus 4.50 Rp. 34,575.00 Rp. 155,587.50
22 Panil Distribusi Bh 1.00 Rp. 12,500,000.00 Rp. 12,500,000.00
JUMLAH Rp. 49,754,675.00
K. BAHAN PIPA DAN SANITAIR
1 Closed Duduk Porselin Komplit Bh 10.00 Rp. 1,784,400.00 Rp. 17,844,000.00
2 Pipa PVC Tipe AW Dia. 3/4" M 21.60 Rp. 33,078.00 Rp. 714,484.80
3 Pipa PVC Tipe AW Dia. 4" M 22.80 Rp. 46,793.00 Rp. 1,066,880.40
4 Kran air Dia. 3/4" atau 1/2" Buah 12.00 Rp. 33,170.00 Rp. 398,040.00
5 Seal Tape Buah 0.25 Rp. 5,000.00 Rp. 1,250.00
6 Pompa Dragon Buah 1.00 Rp. 650,000.00 Rp. 650,000.00
7 Shock ulir Buah 1.00 Rp. 25,000.00 Rp. 25,000.00
8 L Bough 2" Buah 2.00 Rp. 6,000.00 Rp. 12,000.00
9 Pipa PVC dia 1" ( D ) Btg 2.00 Rp. 12,500.00 Rp. 25,000.00
10 Lem PVC Buah 0.10 Rp. 10,000.00 Rp. 1,000.00
JUMLAH Rp. 20,737,655.20

REKAPITULASI BAHAN:
A. BAHAN BAKAR DAN PENCAMPUR ............................................................................. Rp. 52,105.61
B. BAHAN PASIR, BATU DAN SEMEN ............................................................................. Rp. 376,891,471.73
C. BAHAN KAYU, TRIPLEKS DLL ............................................................................. Rp. 140,578,025.88
D. BAHAN BESI, PAKU DAN KAWAT ............................................................................. Rp. #REF!
E. BAHAN PENUTUP ATAP ............................................................................. Rp. 20,802,300.75
F. BAHAN KERAMIK ............................................................................. Rp. 16,942,277.49
G. BAHAN KACA ............................................................................. Rp. 515,486.66
H. BAHAN/ALAT PENGGANTUNG ............................................................................. Rp. #REF!
I. BAHAN CAT ............................................................................. Rp. 9,471,868.72
J. BAHAN LISTRIK DAN ELEKTRONIKA ............................................................................. Rp. 49,754,675.00
K. BAHAN PIPA DAN SANITAIR ............................................................................. Rp. 20,737,655.20

TOTAL KESELURUHAN BAHAN ............................................................................. Rp. #REF!


DIBULATKAN ............................................................................. Rp. #REF!

Terbilang : ' Sembilan Ratus Delapan Puluh Empat Juta Tiga Puluh Ribu Rupiah ",
HASIL PERHITUNGAN LAMANYA WAKTU PELAKSANAAN PEKERJAAN

Koef Teg Kerja Kemam. Pekerjaan Vol Jmlh Hari Utk Rencana Jmlh Orang
No. URAIAN PEKERJAAN Per Satuan Menyelesaikan Pek Pek Menye Kes Hari Yang
Pekerjaan Dalam 1 Hari Vol Pek(1 Org) Kerja Dibutuhkan
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi
P 0.1000 10.00 375.00 37.50 4 9.38 10
M 0.0050 200.00 375.00 1.88 2 0.94 1

3 Gudang Semen dan Peralatan P 1.0000 1.00 28.00 28.00 5 6 6


T 2.0000 0.50 28.00 56.00 5 11 11
KT 0.2000 5.00 28.00 5.60 5 1 1
M 0.0500 20.00 28.00 1.40 5 0.3 1

4 Pengukuran dan Pemasangan Bouwplank P 0.1000 10.00 45.75 4.58 4 1.14 2


T 0.1000 10.00 45.75 4.58 4 1.14 2
KT 0.0100 100.00 45.75 0.46 4 0.11 1
M 0.0050 200.00 45.75 0.23 4 0.06 1
II. PEKERJAAN TANAH DAN PASIR
1 Galian Tanah Pondasi P 0.9000 1.11 43.78 39.40 6 6.57 7
M 0.0450 22.22 43.78 1.97 2 0.98 1
2 Urugan Tanah Kembali P 0.4000 2.50 14.59 5.84 6 0.97 2
M 0.0400 25.00 14.59 0.58 2 0.29 1

3 Urugan Tanah Peninggian Lantai P 0.5000 2.00 149.10 74.55 6 12.43 13


M 0.0500 20.00 149.10 7.46 3 2.49 3

4 Urugan Pasir Bawah Pondasi P 0.3000 3.33 13.54 4.06 2 2.03 2


M 0.0100 100.00 13.54 0.14 2 0.07 1

5 Urugan Pasir Bawah Lantai P 0.3000 3.33 13.40 4.02 2 2.01 2


M 0.0100 100.00 13.40 0.13 2 0.07 1
III. PEKERJAAN PONDASI BETON
1 Lantai Kerja Tebal 10 cm P 1.6500 0.61 3.46 5.70 2 2.85 3
T 0.2750 3.64 3.46 0.95 2 0.48 1
KT 0.0275 36.36 3.46 0.10 2 0.05 1
M 0.0825 12.12 3.46 0.29 2 0.14 1

2 Pondasi Poer B. Bertulang P 5.3000 0.19 10.44 55.33 5 11.07 12


TB 0.2750 3.64 10.44 2.87 5 0.57 1
TK 1.3000 0.77 10.44 13.57 5 2.71 3
TB 1.0500 0.95 10.44 10.96 5 2.19 3
KT 0.2620 3.82 10.44 2.74 5 0.55 1
M 0.2650 3.77 10.44 2.77 5 0.55 1

3 Pas. Pondasi Batu Bata P 2.8571 0.35 41.90 119.70 12 9.98 10


T 1.2857 0.78 41.90 53.87 12 4.49 5
KT 0.4286 2.33 41.90 17.96 12 1.50 2
M 0.1429 7.00 41.90 5.99 12 0.50 1

4 Sloof B.Bertulang 20 x 30 cm P 5.6500 0.18 7.56 42.71 6 7.12 8


TB 0.2750 3.64 7.56 2.08 6 0.35 1
TK 1.5600 0.64 7.56 11.79 6 1.97 2
TB 1.4000 0.71 7.56 10.58 6 1.76 2
KT 0.3230 3.10 7.56 2.44 6 0.41 1
M 0.2830 3.53 7.56 2.14 6 0.36 1
Koef Teg Kerja Kemam. Pekerjaan Vol Jmlh Hari Utk Rencana Jmlh Orang
No. URAIAN PEKERJAAN Per Satuan Menyelesaikan Pek Pek Menye Kes Hari Yang
Pekerjaan Dalam 1 Hari Vol Pek(1 Org) Kerja Dibutuhkan
5 Kolom Utama 15 x 25 B. Bertulang P 7.0500 0.14 6.19 43.62 8 5.45 6
TB 0.2750 3.64 6.19 1.70 8 0.21 1
TK 1.6500 0.61 6.19 10.21 8 1.28 2
TB 2.1000 0.48 6.19 12.99 8 1.62 2
KT 0.4030 2.48 6.19 2.49 8 0.31 1
M 0.3530 2.83 6.19 2.18 8 0.27 1

6 Kolom Praktis 15 x 15 B. Bertulang Begisting


P 0.6600 1.52 2.54 1.68 3 0.56 1
T 0.3300 3.03 2.54 0.84 3 0.28 1
KT 0.0330 30.30 2.54 0.08 3 0.03 1
M 0.0330 30.30 2.54 0.08 3 0.03 1
Campuran
P 6.000 0.17 2.54 15.26 3 5.09 6
T 1.000 1.00 2.54 2.54 3 0.85 1
KT 0.100 10.00 2.54 0.25 3 0.08 1
M 0.300 3.33 2.54 0.76 3 0.25 1

7 Balok Utama 20 x 30 cm B. Bertulang P 6.3500 0.16 8.01 50.86 6 8.48 7


TB 0.2750 3.64 8.01 2.20 6 0.37 1
TK 1.6500 0.61 8.01 13.22 6 2.20 3
TB 1.4000 0.71 8.01 11.21 6 1.87 2
KT 0.3330 3.00 8.01 2.67 6 0.44 1
M 0.3180 3.14 8.01 2.55 6 0.42 1

8 Ring Balk 20 x 30 cm B. Bertulang P 6.3500 0.16 6.03 38.29 6 6.38 7


TB 0.2750 3.64 6.03 1.66 6 0.28 1
TK 1.6500 0.61 6.03 9.95 6 1.66 2
TB 1.4000 0.71 6.03 8.44 6 1.41 2
KT 0.3330 3.00 6.03 2.01 6 0.33 1
M 0.3180 3.14 6.03 1.92 6 0.32 1

9 Cor Plat Lantai Tebal 5 cm P 5.3000 0.19 6.10 32.33 6 5.39 6


TB 0.2750 3.64 6.10 1.68 6 0.28 1
TK 1.3000 0.77 6.10 7.93 6 1.32 2
TB 1.0500 0.95 6.10 6.41 6 1.07 2
KT 0.2650 3.77 6.10 1.62 6 0.27 1
M 0.2650 3.77 6.10 1.62 6 0.27 1

10 Cor Tangga Beton B. Bertulang P 5.6000 0.18 3.02 16.93 6 2.82 3


TB 0.3500 2.86 3.02 1.06 6 0.18 1
TK 2.3000 0.43 3.02 6.96 6 1.16 2
TB 1.4000 0.71 3.02 4.23 6 0.71 1
KT 0.4050 2.47 3.02 1.22 6 0.20 1
M 0.2020 4.95 3.02 0.61 6 0.10 1

11 Cor Plat Dak Tebal 12 cm P 5.3000 0.19 3.12 16.54 5 3.31 4


TB 0.2750 3.64 3.12 0.86 5 0.17 1
TK 1.3000 0.77 3.12 4.06 5 0.81 1
TB 1.0500 0.95 3.12 3.28 5 0.66 1
KT 0.2650 3.77 3.12 0.83 5 0.17 1
M 0.2650 3.77 3.12 0.83 5 0.17 1
Koef Teg Kerja Kemam. Pekerjaan Vol Jmlh Hari Utk Rencana Jmlh Orang
No. URAIAN PEKERJAAN Per Satuan Menyelesaikan Pek Pek Menye Kes Hari Yang
Pekerjaan Dalam 1 Hari Vol Pek(1 Org) Kerja Dibutuhkan
IV. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Dinding 1/2 Bata P 0.0143 70.00 67.89 0.97 14 0.07 1
T 0.0429 23.33 67.89 2.91 14 0.21 1
KT 0.1286 7.78 67.89 8.73 14 0.62 1
M 0.2857 3.50 67.89 19.40 14 1.39 2
2 Plesteran Tebal 20 mm P 0.3000 3.33 1357.75 407.33 14 29.09 30
T 0.1500 6.67 1357.75 203.66 14 14.55 15
KT 0.0150 66.67 1357.75 20.37 14 1.45 2
M 0.0150 66.67 1357.75 20.37 14 1.45 2
3 Cor Lantai, Tebal : 5 cm P 6.0000 0.17 6.10 36.60 7 5.23 6
T 1.0000 1.00 6.10 6.10 7 0.87 1
KT 0.1000 10.00 6.10 0.61 7 0.09 1
M 0.3000 3.33 6.10 1.83 7 0.26 1
V. PEKERJAAN LANTAI DAN DINDING

1 Pas. Lantai Keramik Uk. 60 x 60 cm P 0.2400 4.17 256.50 61.56 6 10.26 11


T 0.1200 8.33 256.50 30.78 6 5.13 6
KT 0.0120 83.33 256.50 3.08 6 0.51 1
M 0.0120 83.33 256.50 3.08 6 0.51 1

2 Pas. Lantai Keramik Tangga Uk. 30 x 30 cm P 0.7000 1.43 17.25 12.08 4 3.02 4
T 0.3500 2.86 17.25 6.04 4 1.51 2
KT 0.0350 28.57 17.25 0.60 4 0.15 1
M 0.0350 28.57 17.25 0.60 4 0.15 1

3 Pas. Dinding Keramik KM/WC P 0.9000 1.11 51.17 46.05 5 9.21 10


Uk. 20 x 20 cm, tinggi : 1,2 m T 0.4500 2.22 51.17 23.03 5 4.61 5
KT 0.0450 22.22 51.17 2.30 5 0.46 1
M 0.0450 22.22 51.17 2.30 5 0.46 1
VI. PEKERJAAN ATAP

1 Pas. Rangka Kuda-kuda & Skor P 4.0000 0.25 2.68 10.72 5 2.14 3
UK. Skor 5/8 cm (Kayu Klas II ) T 12.0000 0.08 2.68 32.16 5 6.43 7
KT 1.2000 0.83 2.68 3.22 5 0.64 1
M 0.2000 5.00 2.68 0.54 5 0.11 1

2 Pas. Gording P 2.4000 0.42 2.50 6.00 4 1.50 2


Uk. 5/8 cm ( Kayu Klas II ) T 7.2000 0.14 2.50 17.99 4 4.50 5
KT 0.7200 1.39 2.50 1.80 4 0.45 1
M 0.1200 8.33 2.50 0.30 4 0.07 1

3 Pas. Atap Seng Gelombang P 0.1200 8.33 294.53 35.34 5 7.07 8


BJLS 0.20 mm T 0.0600 16.67 294.53 17.67 5 3.53 4
KT 0.0060 166.67 294.53 1.77 5 0.35 1
` M 0.0060 166.67 294.53 1.77 5 0.35 1

4 Pas. Lisplank Kayu Kelas II P 0.1000 10.00 71.40 7.14 4 1.79 2


T 0.1000 10.00 71.40 7.14 4 1.79 2
KT 0.0100 100.00 71.40 0.71 4 0.18 1
M 0.0050 200.00 71.40 0.36 4 0.09 1
Koef Teg Kerja Kemam. Pekerjaan Vol Jmlh Hari Utk Rencana Jmlh Orang
No. URAIAN PEKERJAAN Per Satuan Menyelesaikan Pek Pek Menye Kes Hari Yang
Pekerjaan Dalam 1 Hari Vol Pek(1 Org) Kerja Dibutuhkan
VII. PEKERJAAN KUSEN PINTU DAN JENDELA

1 Pas. Rangka Plafond P 0.1700 5.88 248.00 42.16 7 6.02 7


Kayu 5/5 cm T 0.2700 3.70 248.00 66.96 7 9.57 10
KT 0.0270 37.04 248.00 6.70 7 0.96 1
M 0.0085 117.65 248.00 2.11 7 0.30 1

2 Pas. Plafond Gypsum t : 9 mm P 0.1000 10.00 248.00 24.80 5 4.96 5


T 0.0500 20.00 248.00 12.40 5 2.48 3
KT 0.0050 200.00 248.00 1.24 5 0.25 1
M 0.0050 200.00 248.00 1.24 5 0.25 1
VIII. PEKERJAAN KUSEN PINTU DAN JENDELA

1 Pas. Kusen Pintu Dan Jendela


P 6.0000 0.1667 1.52 9.11 2 4.55 4
T 18.0000 0.0556 1.52 27.33 2 13.66 10
KT 1.8000 0.5556 1.52 2.73 2 1.37 1
M 0.3000 3.3333 1.52 0.46 2 0.23 1

2 Luasan Jendela ( J1) P 1.0000 1.00 3.36 3.36 2 1.68 2


T 2.0000 0.50 3.36 6.72 2 3.36 5
KT 1.0000 1.00 3.36 3.36 2 1.68 3
M 0.5000 2.00 3.36 1.68 2 0.84 1

3 Luasan Jendela ( J2) P #REF! #REF! 3.11 #REF! 2 #REF! ###


0 T #REF! #REF! 3.11 #REF! 2 #REF! 8
KT #REF! #REF! 3.11 #REF! 2 #REF! ###
M 0.0400 25.00 3.11 0.12 2 0.06 0

4 Luasan Pintu (P1) P #REF! #REF! 3.57 #REF! 4 #REF! ###


T #REF! #REF! 3.57 #REF! 4 #REF! 2
KT #REF! #REF! 3.57 #REF! 4 #REF! 1
M #REF! #REF! 3.57 #REF! 4 #REF! 1

5 Pas. Pintu Panil Lapis Seng Lat P #REF! #REF! 1.47 #REF! 5 #REF! ###
Bagian Dalam ( 70 x 210 cm ) T #REF! #REF! 1.47 #REF! 5 #REF! ###
KT #REF! #REF! 1.47 #REF! 5 #REF! ###
M #REF! #REF! 1.47 #REF! 5 #REF! ###

IX. PEKERJAAN PENGECATAN

1 Cat Meny Kayu P 0.0750 13.33 75.01 5.63 2 2.81 3


M 0.0040 250.00 75.01 0.30 2 0.15 0

2 Cat Kilap Kayu T 0.0750 13.33 75.01 5.63 2 2.81 3


KT 0.0080 125.00 75.01 0.60 2 0.30 0

3 Cat Tembok untuk Dinding P 0.02 50.00 1357.75 27.16 6 4.53 5


T 0.063 15.87 1357.75 85.54 6 14.26 15
KT 0.0063 158.73 1357.75 8.55 6 1.43 2
M 0.0025 400.00 1357.75 3.39 6 0.57 1

Koef Teg Kerja Kemam. Pekerjaan Vol Jmlh Hari Utk Rencana Jmlh Orang
No. URAIAN PEKERJAAN Per Satuan Menyelesaikan Pek Pek Menye Kes Hari Yang
Pekerjaan Dalam 1 Hari Vol Pek(1 Org) Kerja Dibutuhkan
4 Cat Plafon P 0.0600 16.67 248.00 14.88 4 3.72 4
T 0.0400 25.00 248.00 9.92 4 2.48 2
KT 0.0040 250.00 248.00 0.99 4 0.25 1
M 0.0030 333.33 248.00 0.74 4 0.19 1.00

X. PEKEKERJAAN INSTALASI LISTRIK


1 Titik Instalasi Lampu SL 18-23 VA + Pitting+S UM 1 1 17.00 17 3 5.6667 6
1 Titik Instalasi Lampu SL 18-14 VA + Pitting+S UM 1 1 3.00 3 3 1 1
1 Titik Saklar Tunggal UM 1 1 8.00 8 3 2.6667 3
1 Titik Instalasi Stop Kontak UM 1 1 1.00 1 3 0.3333 1
1 Unit Panel Box UM 1 1 8.00 8 3 2.6667 3
XI. PEKEKERJAAN SANITASI

1 Bak air P 2.1600 0.46 10.00 21.60 3 7.20 8


T 0.1000 10.00 10.00 1.00 2 0.50 1
TB 0.7200 1.39 10.00 7.20 2 3.60 4
KT 0.0720 13.89 10.00 0.72 2 0.36 1
M 0.1080 9.26 10.00 1.08 2 0.54 1

2 Pas. Closet Jongkok Porcelin P 1.0000 1.00 10.00 10.00 3 3.33 4


T 1.5000 0.67 10.00 15.00 1 15.00 15
KT 0.1500 6.67 10.00 1.50 1 1.50 2
M 0.1600 6.25 10.00 1.60 1 1.60 2

3 1 Unit Septictank P 2.5000 0.40 2.00 5.00 2 2.50 3


2 x (1 x 1) dalam 1,5 M + Resapan T 5.0000 0.20 2.00 10.00 2 5.00 6
KT 0.5000 2.00 2.00 1.00 2 0.50 1
M 0.2500 4.00 2.00 0.50 2 0.25 1

4 1 M' Memasang Pipa PVC Tipe AW Dia. 3/4" P 0.0360 27.778 18.00 0.65 2 0.32 1
T 0.0600 16.667 18.00 1.08 2 0.54 1
KT 0.0060 166.667 18.00 0.11 2 0.05 1
M 0.0018 555.556 18.00 0.03 2 0.02 1
###
5 1 M' Memasang Pipa PVC Tipe AW Dia. 4" P 0.0810 12.346 19.00 1.54 2 0.77 1
T 0.1350 7.407 19.00 2.57 2 1.28 2
KT 0.1350 7.407 19.00 2.57 2 1.28 2
M 0.0041 243.902 19.00 0.08 2 0.04 1
KT
6 1 BH Kran air Dia. 3/4" atau 1/2" T 0.1000 10.000 10.00 1.00 1 1.00 1
KT 0.0100 10.000 10.00 1.00 1 1.00 1

7 1 UNIT Pompa dragon/pompa tangan P 6.0000 0.167 1.00 6.00 2 3.00 3


T 1.0000 1.000 1.00 1.00 2 0.50 1
KT 0.1000 10.000 1.00 0.10 2 0.05 1
M 0.3000 3.333 1.00 0.30 2 0.15 1
TOTAL KEBUTUHAN BIAYA PEKERJA

RENCANA JUMLAH
TENAGA
No. URAIAN PEKERJAAN HARI TENAGA HARGA SATUAN JUMLAH HARGA
( OH ) KERJA ( OH )
A B C D E F DxExF=
I. PEKERJAAN PERSIAPAN
1 Membersihkan Lapangan dan Perataan Pekerja 4 10 Rp 152,000.00 Rp
Mandor 4 1 Rp 213,000.0 Rp
JUMLAH Rp
3 Gudang Semen dan Peralatan Pekerja 5 6 Rp 152,000.00 Rp
Tukang kayu 5 11 Rp 194,000.00 Rp
Kepala Tukang 5 1 Rp 202,000.00 Rp
Mandor 5 1 Rp 213,000.00 Rp
JUMLAH Rp
4 Pengukuran dan Bouwplank
Pekerja kayu 4 2 Rp 152,000.00 Rp
Tukang kayu 4 2 Rp 194,000.00 Rp
Kepala Tukang Kayu 4 1 Rp 202,000.00 Rp
Mandor 4 1 Rp 213,000.00 Rp
JUMLAH Rp
II. PEKERJAAN TANAH DAN PASIR
1 Galian Tanah Biasa Sedalam 1 - 2 M Pekerja 6 7 Rp 148,350.00 Rp
Mandor 6 1 Rp 213,000.00 Rp
JUMLAH Rp
2 Urug Kembali Tanah Biasa Sedalam 1 - 2 M Pekerja 6 2 Rp 148,350.00 Rp
Mandor 6 1 Rp 213,000.00 Rp
JUMLAH Rp
3 Urugan Tanah Urug (material didatangkan) Pekerja 6 13 Rp 148,350.00 Rp
Mandor 6 3 Rp 213,000.00 Rp
JUMLAH Rp
4 Urugan Pasir Bawah Pondasi/Lantai/Konstruksi Pekerja 2 2 Rp 148,350.00 Rp
Mandor 2 1 Rp 213,000.00 Rp
JUMLAH Rp
5 Urugan Pasir Bawah Lantai Pekerja 2 2 Rp 148,350.00 Rp
Mandor 2 1 Rp 213,000.00 Rp
JUMLAH Rp
III. PEKERJAAN PONDASI BETON DAN PASANGAN
1 Lantai Keraja Pekerja pasir/batu 2 3 Rp 152,000.00 Rp
Beton mutu f’'c = 21,7 MPa (K 250) Tukang pasir/batu 2 1 Rp 194,000.00 Rp
Kepala tukang pasir/bat 2 1 Rp 202,000.00 Rp
Mandor pasir/batu 2 1 Rp 213,000.00 Rp
JUMLAH Rp
2 Pondasi beton bertulang (150 kg besi + bekisting) Pekerja 5 12 Rp 152,000.00 Rp
Tukang Batu 5 1 Rp 194,000.00 Rp
Tukang Kayu 5 3 Rp 194,000.00 Rp
Tukang Besi 5 3 Rp 194,000.00 Rp
Kepala Tukang 5 1 Rp 202,000.00 Rp
Mandor 5 1 Rp 213,000.00 Rp
JUMLAH Rp
3 Pasangan Pondasi Bata Pekerja pasir/batu 12 10 Rp 152,000.00 Rp
Tukang pasir/batu 12 5 Rp 194,000.00 Rp
Kepala tukang pasir/bat 12 2 Rp 202,000.00 Rp
Mandor pasir/batu 12 1 Rp 213,000.00 Rp
JUMLAH Rp
4 Sloof beton bertulang (200 kg besi + bekisting) Pekerja 6 8 Rp 152,000.00 Rp
Tukang Batu 6 1 Rp 194,000.00 Rp
Tukang Kayu 6 2 Rp 194,000.00 Rp
Tukang Besi 6 2 Rp 194,000.00 Rp
Kepala Tukang 6 1 Rp 202,000.00 Rp
Mandor 6 1 Rp 213,000.00 Rp
JUMLAH Rp
RENCANA JUMLAH
TENAGA
No. URAIAN PEKERJAAN HARI TENAGA HARGA SATUAN JUMLAH HARGA
( OH ) KERJA ( OH )
A B C D E F DxExF=
5 Kolom beton bertulang (300 kg besi + bekisting) Pekerja 8 6 Rp 152,000.00 Rp
Tukang Batu 8 1 Rp 194,000.00 Rp
Tukang Kayu 8 2 Rp 194,000.00 Rp
Tukang Besi 8 2 Rp 194,000.00 Rp
Kepala Tukang 8 1 Rp 202,000.00 Rp
Mandor 8 1 Rp 213,000.00 Rp
JUMLAH Rp
6 Kolom 15 x 15 (1PC : 3PS) - Pasir Import Pekerja 3 3 Rp 152,000.00 Rp
Tukang Batu 3 2 Rp 194,000.00 Rp
Tukang Kayu 3 2 Rp 194,000.00 Rp
Tukang Besi 3 2 Rp 194,000.00 Rp
Kepala Tukang 3 2 Rp 202,000.00 Rp
Mandor 3 6 Rp 213,000.00 Rp
JUMLAH Rp
7 Balok beton bertulang (200 kg besi + bekisting) Pekerja 6 7 Rp 152,000.00 Rp
Tukang Batu 6 1 Rp 194,000.00 Rp
Tukang Kayu 6 3 Rp 194,000.00 Rp
Tukang Besi 6 2 Rp 194,000.00 Rp
Kepala Tukang 6 1 Rp 202,000.00 Rp
Mandor 6 1 Rp 213,000.00 Rp
JUMLAH Rp
8 Ringbalk beton bertulang (200 kg besi + bekisting) Pekerja 6 7 Rp 152,000.00 Rp
Tukang Batu 6 1 Rp 194,000.00 Rp
Tukang Kayu 6 2 Rp 194,000.00 Rp
Tukang Besi 6 2 Rp 194,000.00 Rp
Kepala Tukang 6 1 Rp 202,000.00 Rp
Mandor 6 1 Rp 213,000.00 Rp
JUMLAH Rp
9 Plat beton bertulang (150 kg besi + bekisting) Pekerja 6 6 Rp 152,000.00 Rp
Tukang Batu 6 1 Rp 194,000.00 Rp
Tukang Kayu 6 2 Rp 194,000.00 Rp
Tukang Besi 6 2 Rp 194,000.00 Rp
Kepala Tukang 6 1 Rp 202,000.00 Rp
Mandor 6 1 Rp 213,000.00 Rp
JUMLAH Rp
10 Tangga beton bertulang (150 kg besi + bekisting) Pekerja 6 3 Rp 152,000.00 Rp
Tukang Batu 6 1 Rp 194,000.00 Rp
Tukang Kayu 6 2 Rp 194,000.00 Rp
Tukang Besi 6 1 Rp 194,000.00 Rp
Kepala Tukang 6 1 Rp 202,000.00 Rp
Mandor 6 1 Rp 213,000.00 Rp
JUMLAH Rp
11 Cor Plat Dak Tebal 12 cm Pekerja 5 4 Rp 152,000.00 Rp
Tukang Batu 5 1 Rp 194,000.00 Rp
Tukang Kayu 5 1 Rp 194,000.00 Rp
Tukang Besi 5 1 Rp 194,000.00 Rp
Kepala Tukang 5 1 Rp 202,000.00 Rp
Mandor 5 1 Rp 213,000.00 Rp
JUMLAH Rp
IV. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasangan Dinding 1/2 Bata Pekerja pasir/batu 14 1 Rp 152,000.00 Rp
Tukang pasir/batu 14 1 Rp 194,000.00 Rp
Kepala tukang pasir/bat 14 1 Rp 202,000.00 Rp
Mandor pasir/batu 14 2 Rp 213,000.00 Rp
JUMLAH Rp
2 Plesteran 1PC : 3PS, Tebal 15 mm - Pasir Lokal Pekerja pasir/batu 14 30 Rp 152,000.00 Rp
Tukang pasir/batu 14 15 Rp 194,000.00 Rp
Kepala tukang pasir/bat 14 2 Rp 202,000.00 Rp
Mandor pasir/batu 14 2 Rp 213,000.00 Rp
JUMLAH Rp
3 Cor Lantai Pekerja pasir/batu 7 6 Rp 152,000.00 Rp
Tukang pasir/batu 7 1 Rp 194,000.00 Rp
Kepala tukang pasir/bat 7 1 Rp 202,000.00 Rp
Mandor pasir/batu 7 1 Rp 213,000.00 Rp
JUMLAH Rp
RENCANA JUMLAH
TENAGA
No. URAIAN PEKERJAAN HARI TENAGA HARGA SATUAN JUMLAH HARGA
( OH ) KERJA ( OH )
A B C D E F DxExF=
V. PEKERJAAN LANTAI DAN DINDING
1 Pas. Lantai Keramik Uk. 60 x 60 cm Pekerja 6 11 Rp 152,000.00 Rp
Tukang batu 6 6 Rp 194,000.00 Rp
Kepala tukang 6 1 Rp 202,000.00 Rp
Mandor 6 1 Rp 213,000.00 Rp
JUMLAH Rp
2 Pas. Lantai Keramik Tangga Uk. 30 x 30 cm Pekerja 4 4 Rp 152,000.00 Rp
Tukang batu 4 2 Rp 194,000.00 Rp
Kepala tukang 4 1 Rp 202,000.00 Rp
Mandor 4 1 Rp 213,000.00 Rp
JUMLAH Rp
3 Pas. Lantai Keramik KM/WC Uk. 20 x 20 cm Pekerja 4 4 Rp 152,000.00 Rp
Tukang batu 4 2 Rp 194,000.00 Rp
Kepala tukang 4 1 Rp 202,000.00 Rp
Mandor 4 1 Rp 213,000.00 Rp
JUMLAH Rp
4 Pas. Dinding Keramik KM/WC Uk. 20 x 20 cm, tinggiPekerja 5 10 Rp 152,000.00 Rp
Tukang batu 5 5 Rp 194,000.00 Rp
Kepala tukang 5 1 Rp 202,000.00 Rp
Mandor 5 1 Rp 213,000.00 Rp
JUMLAH Rp

VI. PEKERJAAN ATAP

1 Konstruksi Kuda-Kuda, Kayu Kelas II Pekerja Kayu 5 3 Rp 152,000.00 Rp


Tukang Kayu 5 7 Rp 194,000.00 Rp
Kepala Tukang 5 1 Rp 202,000.00 Rp
Mandor 5 1 Rp 213,000.00 Rp
JUMLAH Rp
2 Konstruksi Gordeng - Kayu Kelas II Pekerja Kayu 4 2 Rp 152,000.00 Rp
Tukang Kayu 4 5 Rp 194,000.00 Rp
Kepala Tukang 4 1 Rp 202,000.00 Rp
Mandor 4 1 Rp 213,000.00 Rp
JUMLAH Rp
3 Penutup Atap Seng Gelombang BJLS 0,20 mm Pekerja 5 8 Rp 152,000.00 Rp
Tukang Kayu 5 4 Rp 194,000.00 Rp
Kepala Tukang 5 1 Rp 202,000.00 Rp
Mandor 5 1 Rp 213,000.00 Rp
JUMLAH Rp
4 Lisplank Ukuran (2 x 20) cm, Kayu Kelas II Pekerja Kayu 4 2 Rp 152,000.00 Rp
Tukang Kayu 4 2 Rp 194,000.00 Rp
Kepala Tukang 4 1 Rp 202,000.00 Rp
Mandor 4 1 Rp 213,000.00 Rp
JUMLAH Rp
VII. PEKERJAAN PLAFOND
1 Rangka Plafond (60 x 120), Kayu Kelas II Pekerja Kayu 7 7 Rp 152,000.00 Rp
Tukang Kayu 7 10 Rp 194,000.00 Rp
Kepala Tukang 7 1 Rp 202,000.00 Rp
Mandor 7 1 Rp 213,000.00 Rp
JUMLAH Rp
2 Pas. Plafond Gypsum t : 9 mm Pekerja Kayu 5 5 Rp 152,000.00 Rp
Tukang Kayu 5 3 Rp 194,000.00 Rp
Kepala Tukang 5 1 Rp 202,000.00 Rp
Mandor 5 1 Rp 213,000.00 Rp
JUMLAH Rp
VIII. PEKERJAAN KUSEN PINTU DAN JENDELA
1 Pas. Kusen Pintu Dan Jendela
Pekerja Kayu 2 2 Rp 152,000.00 Rp
Tukang Kayu 2 5 Rp 194,000.00 Rp
Kepala Tukang 2 1 Rp 202,000.00 Rp
Mandor 2 1 Rp 213,000.00 Rp
JUMLAH Rp
RENCANA JUMLAH
TENAGA
No. URAIAN PEKERJAAN HARI TENAGA HARGA SATUAN JUMLAH HARGA
( OH ) KERJA ( OH )
A B C D E F DxExF=
2 Luasan Jendela ( J1) Pekerja Kayu 2 2 Rp 152,000.00 Rp
Tukang Kayu 2 5 Rp 194,000.00 Rp
Kepala Tukang 2 3 Rp 202,000.00 Rp
Mandor 2 1 Rp 213,000.00 Rp
JUMLAH Rp
3 Luasan Jendela ( J2) Pekerja Kayu 2 #REF! Rp 152,000.00 Rp
Tukang Kayu 2 8 Rp 194,000.00 Rp
Kepala Tukang 2 #REF! Rp 202,000.00 Rp
Mandor 2 0 Rp 213,000.00 Rp
JUMLAH Rp
4 Luasan Pintu (P1) Pekerja Kayu 4 #REF! Rp 152,000.00 Rp
Tukang Kayu 4 2 Rp 194,000.00 Rp
Kepala Tukang 4 1 Rp 202,000.00 Rp
Mandor 4 1 Rp 213,000.00 Rp
JUMLAH Rp
5 Pintu double tripleks 70 x 210 cm Pekerja Kayu 5 #REF! Rp 152,000.00 Rp
Tukang Kayu 5 #REF! Rp 194,000.00 Rp
Kepala Tukang 5 #REF! Rp 202,000.00 Rp
Mandor 5 #REF! Rp 213,000.00 Rp
JUMLAH Rp
IX. PEKERJAAN PENGECATAN
1 Cat Meny Kayu Pekerja cat 2 3 Rp 152,000.00 Rp
Mandor cat 2 0 Rp 213,000.00 Rp
JUMLAH Rp
2 Cat Kilap Kayu Tukang cat 2 3 Rp 194,000.00 Rp
Kepala tukang cat 2 0 Rp 202,000.00 Rp
JUMLAH Rp
3 Cat Tembok Untuk Dinding Pekerja cat 6 5 Rp 152,000.00 Rp
Tukang cat 6 15 Rp 194,000.00 Rp
Kepala tukang cat 6 2 Rp 202,000.00 Rp
Mandor cat 6 1 Rp 213,000.00 Rp
JUMLAH Rp
4 Cat Plafond Pekerja cat 4 4 Rp 152,000.00 Rp
Tukang cat 4 2 Rp 194,000.00 Rp
Kepala tukang cat 4 1 Rp 202,000.00 Rp
Mandor cat 4 1 Rp 213,000.00 Rp
JUMLAH Rp
X. PEKEKERJAAN INSTALASI LISTRIK
1 Instalasi Lampu SL 18 - 23 VA+ Pitting + Saklar Upah Memasang 1 1 Rp 60,000.00 Rp
JUMLAH Rp

2 Instalasi Lampu SL 8 - 14 VA+ Pitting + Saklar Upah Memasang 1 1 Rp 60,000.00 Rp


JUMLAH Rp

3 Saklar Ganda Upah Memasang 1 1 Rp 304,000.00 Rp


JUMLAH Rp

4 Saklar Tunggal Upah Memasang 1 1 Rp 304,000.00 Rp


JUMLAH Rp

5 Instalasi Stop Kontak Upah Memasang 1 1 Rp 60,000.00 Rp


JUMLAH Rp

6 Panel Box Upah Memasang 1 1 Rp 60,000.00 Rp


JUMLAH Rp
XI. PEKEKERJAAN SANITASI
1 Bak Kontrol Pasangan Bata Ukuran (60 x 60) x 65 Pekerja pasir/batu 3 8 Rp 152,000.00 Rp
Tukang gali 3 1 Rp 194,000.00 Rp
Tukang pasir/batu 3 4 Rp 194,000.00 Rp
Kepala tukang pasir/bat 3 1 Rp 202,000.00 Rp
Mandor pasir/batu 3 1 Rp 213,000.00 Rp
JUMLAH Rp

RENCANA JUMLAH
TENAGA
No. URAIAN PEKERJAAN HARI TENAGA HARGA SATUAN JUMLAH HARGA
( OH ) KERJA ( OH )
A B C D E F DxExF=
2 Closet jongkok porselin Pekerja pasir/batu 3 4 Rp 152,000.00 Rp
Tukang pasir/batu 3 15 Rp 194,000.00 Rp
Kepala tukang pasir/bat 3 2 Rp 202,000.00 Rp
Mandor pasir/batu 3 2 Rp 213,000.00 Rp
JUMLAH Rp
3 Septictank 2 x (1 x 1) dalam 1,5 M + Resapan Pekerja pasir/batu 2 3 Rp 152,000.00 Rp
Tukang pasir/batu 2 6 Rp 194,000.00 Rp
Kepala tukang pasir/bat 2 1 Rp 202,000.00 Rp
Mandor pasir/batu 2 1 Rp 213,000.00 Rp
JUMLAH Rp
4 Memasang Pipa PVC Tipe AW Dia. 3/4" Pekerja 2 1 Rp 152,000.00 Rp
Tukang pipa 2 1 Rp 194,000.00 Rp
Kepala tukang 2 1 Rp 202,000.00 Rp
Mandor 2 1 Rp 213,000.00 Rp
JUMLAH Rp
5 Memasang Pipa PVC Tipe AW Dia. 4" Pekerja 2 0.7695 Rp 152,000.00 Rp
Tukang pipa 2 2 Rp 194,000.00 Rp
Kepala tukang 2 2 Rp 202,000.00 Rp
Mandor 2 1 Rp 213,000.00 Rp
JUMLAH Rp
6 Kran air Dia. 3/4" atau 1/2" Tukang pipa 1 1 Rp 194,000.00 Rp
Kepala tukang 1 1 Rp 213,000.00 Rp
JUMLAH Rp
7 Pompa dragon/pompa tangan Pekerja 2 3 Rp 152,000.00 Rp
Tukang pipa 2 0.5 Rp 194,000.00 Rp
Kepala tukang 2 1 Rp 202,000.00 Rp
Mandor 2 1 Rp 213,000.00 Rp
JUMLAH Rp

REKAPITULASI :
I. PEKERJAAN PERSIAPAN .............................................................................................................................. Rp

II. PEKERJAAN TANAH DAN PASIR .............................................................................................................................. Rp

III. PEKERJAAN PONDASI DAN BETON .............................................................................................................................. Rp

IV. PEKERJAAN PASANGAN DAN PLESTERAN .............................................................................................................................. Rp

V. PEKERJAAN LANTAI DAN DINDING .............................................................................................................................. Rp

VI. PEKERJAAN ATAP .............................................................................................................................. Rp

VII. PEKERJAAN PLAFOND .............................................................................................................................. Rp

VIII. PEKERJAAN KUSEN PINTU DAN JENDELA .............................................................................................................................. Rp

IX. PEKERJAAN PENGECATAN .............................................................................................................................. Rp

X. PEKEKERJAAN INSTALASI LISTRIK .............................................................................................................................. Rp

XI. PEKEKERJAAN SANITASI .............................................................................................................................. Rp

XII. PEKEKERJAAN FINISHING .............................................................................................................................. Rp

TOTAL ………………….………………………… Rp
DIBULATKAN ………………….………………………… Rp
Terbilang : 'Tiga Ratus Dua Puluh Tujuh Juta Sembilan Ratus Empat Puluh Ribu Rupiah,-"

REKAPITULASI :
1 Pekerja .............................................................................................................................. Rp

2 Tukang (Batu, Pasir, Kayu, dsb) .............................................................................................................................. Rp

3 Kepala Tukang (Batu, Pasir, Kayu, dsb) .............................................................................................................................. Rp

4 Mandor Bangunan / Lapangan .............................................................................................................................. Rp

Merauke, NOVEMBER 2020


Dibuat Oleh
Diperiksa Oleh ESTIMATOR

…............................... AGUS PUTRA LAKSONO


ASISTEN DOSEN 2018-22-201-003
RJA

JUMLAH HARGA

DxExF=

6,080,000.00
213,000.00
6,293,000.00
4,560,000.00
10,670,000.00
1,010,000.00
1,065,000.00
17,305,000.00

1,216,000.00
1,552,000.00
808,000.00
852,000.00
4,428,000.00

6,230,700.00
1,278,000.00
7,508,700.00
1,780,200.00
1,278,000.00
3,058,200.00
11,571,300.00
3,834,000.00
15,405,300.00
593,400.00
426,000.00
1,019,400.00
593,400.00
426,000.00
1,019,400.00

912,000.00
388,000.00
404,000.00
426,000.00
2,130,000.00
9,120,000.00
970,000.00
2,910,000.00
2,910,000.00
1,010,000.00
1,065,000.00
17,985,000.00
18,240,000.00
11,640,000.00
4,848,000.00
2,556,000.00
37,284,000.00
7,296,000.00
1,164,000.00
2,328,000.00
2,328,000.00
1,212,000.00
1,278,000.00
15,606,000.00
JUMLAH HARGA

DxExF=
7,296,000.00
1,552,000.00
3,104,000.00
3,104,000.00
1,616,000.00
1,704,000.00
18,376,000.00
1,368,000.00
1,164,000.00
1,164,000.00
1,164,000.00
1,212,000.00
3,834,000.00
9,906,000.00
6,384,000.00
1,164,000.00
3,492,000.00
2,328,000.00
1,212,000.00
1,278,000.00
15,858,000.00
6,384,000.00
1,164,000.00
2,328,000.00
2,328,000.00
1,212,000.00
1,278,000.00
14,694,000.00
5,472,000.00
1,164,000.00
2,328,000.00
2,328,000.00
1,212,000.00
1,278,000.00
13,782,000.00
2,736,000.00
1,164,000.00
2,328,000.00
1,164,000.00
1,212,000.00
1,278,000.00
9,882,000.00
3,040,000.00
970,000.00
970,000.00
970,000.00
1,010,000.00
1,065,000.00
8,025,000.00

2,128,000.00
2,716,000.00
2,828,000.00
5,964,000.00
13,636,000.00
63,840,000.00
40,740,000.00
5,656,000.00
5,964,000.00
116,200,000.00
6,384,000.00
1,183,400.00
1,414,000.00
1,491,000.00
10,472,400.00
JUMLAH HARGA

DxExF=

10,032,000.00
6,984,000.00
1,212,000.00
1,278,000.00
19,506,000.00
2,432,000.00
1,552,000.00
808,000.00
852,000.00
5,644,000.00
2,432,000.00
1,552,000.00
808,000.00
852,000.00
5,644,000.00
7,600,000.00
4,850,000.00
1,010,000.00
1,065,000.00
14,525,000.00

2,280,000.00
6,790,000.00
1,010,000.00
1,065,000.00
11,145,000.00
1,216,000.00
3,880,000.00
808,000.00
852,000.00
6,756,000.00
6,080,000.00
3,880,000.00
1,010,000.00
1,065,000.00
12,035,000.00
1,085,280.00
1,385,160.00
808,000.00
852,000.00
4,130,440.00

7,448,000.00
12,990,240.00
1,352,592.00
1,491,000.00
23,281,832.00
3,800,000.00
2,910,000.00
1,010,000.00
1,065,000.00
8,785,000.00

608,000.00
1,940,000.00
404,000.00
426,000.00
3,378,000.00
JUMLAH HARGA

DxExF=
510,720.00
1,940,000.00
1,212,000.00
426,000.00
4,088,720.00
#REF!
3,104,000.00
#REF!
26,480.16
#REF!
#REF!
1,552,000.00
808,000.00
852,000.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

855,136.80
63,910.22
919,047.02
1,091,424.60
121,219.39
1,212,643.99
4,127,566.08
17,460,000.00
2,424,000.00
723,002.94
24,734,569.02
2,261,760.00
1,924,480.00
808,000.00
852,000.00
5,846,240.00

60,000.00
60,000.00

60,000.00
60,000.00

304,000.00
304,000.00

304,000.00
304,000.00

60,000.00
60,000.00

60,000.00
60,000.00

3,648,000.00
291,000.00
2,095,200.00
606,000.00
345,060.00
6,985,260.00

JUMLAH HARGA

DxExF=
1,824,000.00
8,730,000.00
909,000.00
1,022,400.00
12,485,400.00
760,000.00
2,328,000.00
202,000.00
426,000.00
3,716,000.00
304,000.00
388,000.00
404,000.00
426,000.00
1,522,000.00
233,928.00
776,000.00
808,000.00
426,000.00
2,243,928.00
194,000.00
213,000.00
407,000.00
912,000.00
194,000.00
404,000.00
426,000.00
1,936,000.00

10,721,000.00

28,011,000.00

155,503,000.00

140,308,400.00

45,319,000.00

34,066,440.00

32,066,832.00

#REF!

32,712,500.04

5,848,000.00

29,295,588.00

3,000,000.00

#REF!
#REF!
mpat Puluh Ribu Rupiah,-"

#REF!

#REF!

#REF!

29,936,000.00

Merauke, NOVEMBER 2020


Dibuat Oleh
ESTIMATOR

AGUS PUTRA LAKSONO


2018-22-201-003
CRITICAL PART NETHOD ( CPM )

PROJECT EVELUCATION REVIEW TECHNIQUE ( PERT )

TERGANTUNG WAKTU BIAYA


NO JENIS PEKERJAAN KODE
PADA PER MINGGU ( Rp )
I. PEKERJAAN PERSIAPAN A B,C 2 51,771,582.78

II. PEKERJAAN TANAH DAN PASIR B D 2 91,870,562.68

III. PEKERJAAN PONDASI DAN BETON C E 10 575,111,641.56

IV. PEKERJAAN PASANGAN DAN PLESTERAN D F 5 201,770,649.48

V. PEKERJAAN LANTAI DAN DINDING E G 2 115,808,864.60

VI. PEKERJAAN ATAP F H 2 62,668,719.43

VII. PEKERJAAN PLAFOND G I 2 50,557,029.52

VIII. PEKERJAAN KUSEN PINTU DAN JENDELA H J 2 25,573,797.63

IX. PEKERJAAN PENGECATAN I K 2 47,996,791.08

X. PEKEKERJAAN INSTALASI LISTRIK J L 1 39,250,478.00

XI. PEKEKERJAAN SANITASI K L 2 51,740,941.68

XII. PEKEKERJAAN FINISHING L 1 3,000,000.00


Total Waktu 33
Total Biaya 1,317,121,058.43
C D G E

A B I L

K F J H
NO JENIS PEKERJAAN KODE TERGANTUNG WAKTU BIAYA

I. PEKERJAAN PERSIAPAN A B,C 1 51,771,582.78

II. PEKERJAAN TANAH DAN PASIR B D 2 91,870,562.68

III. PEKERJAAN PONDASI DAN BETON C E 8 575,111,641.56

IV. PEKERJAAN PASANGAN DAN PLESTERAN D F 3 201,770,649.48

V. PEKERJAAN LANTAI DAN DINDING E G 2 115,808,864.60

VI. PEKERJAAN ATAP F H 1 62,668,719.43

VII. PEKERJAAN PLAFOND G I 2 50,557,029.52

VIII. PEKERJAAN KUSEN PINTU DAN JENDELA H J 2 96,694,497.11

IX. PEKERJAAN PENGECATAN I K 1 47,996,791.08

X. PEKEKERJAAN INSTALASI LISTRIK J L 1 39,250,478.00

XI. PEKEKERJAAN SANITASI K L 1 51,740,941.68

XII. PEKEKERJAAN FINISHING L 1 3,000,000.00


Total Waktu 25
Total Biaya 1,388,241,757.91
NO JENIS PEKERJAAN KODE DURASI LF LS

I. PEKERJAAN PERSIAPAN A 1

II. PEKERJAAN TANAH DAN PASIR B 2

III. PEKERJAAN PONDASI DAN BETON C 8

IV. PEKERJAAN PASANGAN DAN PLESTERAN D 3

V. PEKERJAAN LANTAI DAN DINDING E 2

VI. PEKERJAAN ATAP F 1

VII. PEKERJAAN PLAFOND G 2

VIII. PEKERJAAN KUSEN PINTU DAN JENDELA H 2

IX. PEKERJAAN PENGECATAN I 1

X. PEKEKERJAAN INSTALASI LISTRIK J 1

XI. PEKEKERJAAN SANITASI K 1

XII. PEKEKERJAAN FINISHING L 1


Total Waktu 25
NO JENIS PEKERJAAN KODE DURASI EF ES

I. PEKERJAAN PERSIAPAN A 1

II. PEKERJAAN TANAH DAN PASIR B 2

III. PEKERJAAN PONDASI DAN BETON C 8

IV. PEKERJAAN PASANGAN DAN PLESTERAN D 3

V. PEKERJAAN LANTAI DAN DINDING E 2

VI. PEKERJAAN ATAP F 1

VII. PEKERJAAN PLAFOND G 2

VIII. PEKERJAAN KUSEN PINTU DAN JENDELA H 2

IX. PEKERJAAN PENGECATAN I 1

X. PEKEKERJAAN INSTALASI LISTRIK J 1

XI. PEKEKERJAAN SANITASI K 1

XII. PEKEKERJAAN FINISHING L 1


Total Waktu 25
NO JENIS PEKERJAAN KODE TERGANTUNG OPTIMIS REALISTIS PSIMIS

I. PEKERJAAN PERSIAPAN A B,C 1 51,771,582.78

II. PEKERJAAN TANAH DAN PASIR B D 2 91,870,562.68

III. PEKERJAAN PONDASI DAN BETON C E 8 575,111,641.56

IV. PEKERJAAN PASANGAN DAN PLESTERAN D F 3 201,770,649.48

V. PEKERJAAN LANTAI DAN DINDING E G 2 115,808,864.60

VI. PEKERJAAN ATAP F H 1 62,668,719.43

VII. PEKERJAAN PLAFOND G I 2 50,557,029.52

VIII. PEKERJAAN KUSEN PINTU DAN JENDELA H J 2 96,694,497.11

IX. PEKERJAAN PENGECATAN I K 1 47,996,791.08

X. PEKEKERJAAN INSTALASI LISTRIK J L 1 39,250,478.00

XI. PEKEKERJAAN SANITASI K L 1 51,740,941.68

XII. PEKEKERJAAN FINISHING L 1 3,000,000.00


Total Waktu 25
C D G
8 3 2 2
B E
A L
1 2 1 1
K I
1 1 1 2
F J H
KRITIS KRITIS KRITIS
KRITIS 4 D 7 F 8 H 10
3 5 7 9
B 4 3 7 1 8 2 10 J KRITIS KRITIS
KRITIS 2 1
0 A 2 DAMMY 11 L 12
1 2 11 12
0 2 2 11 1 12
8 2
C 10 2 12 2 14 1 15 K
4 6 8 10
4 E 6 G 8 I 9

Keterangan :
(+) Pilih Yang BESAR

(-) Pilih Yang TERKECIL

Jalur Kritis adalah Jalur yang tidak ada toleransinya


Jalur Kritis = A - B - D - F - H - J -L
= 1 + 2 + 3 + 1 + 2+ 1 + 1
= 11 ( Minggu )
EET = EARLIEST EVENT TIME
Saat kejadian paling cepat
NOMOR KERJADIAN 0
0
0

LET = LATEST EVENT TIME


Saat kejadian paling lambat
KRITIS KRITIS KRITIS
KRITIS 1 D 1 F 1 H 1
3 5 7 9
B 1 0 1 0 1 0 1 J KRITIS KRITIS
KRITIS 0 0
0 A 1 DAMMY 1 L 1
1 2 11 12
1 1 1 1 0 1
0 0
C 1 0 1 0 1 0 1 K
4 6 8 10
1 E 1 G 1 I 1
TIME SCHEDULE " KURVA S "

JUMLAH BULAN KE 1 BULAN KE 2 BULAN KE 3 BULAN KE 4

NO JENIS PEKERJAAN HARGA BOBOT MINGGU KE MINGGU KE MINGGU KE MINGGU KE KETERANGAN


(%)
( Rp ) 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

I. PEKERJAAN PERSIAPAN 51,771,582.78 3.931 1.965 1.965


100%

II. PEKERJAAN TANAH DAN PASIR 91,870,562.68 6.975 3.488 3.488

III. PEKERJAAN PONDASI DAN BETON 575111641.559398 43.664 4.366 4.366 4.366 4.366 4.366 4.366 4.366 4.366 4.366 4.366

VI. PEKERJAAN PASANGAN DAN PLESTERAN 201,770,649.48 15.319 3.064 3.064 3.064 3.064 3.064

V. PEKERJAAN LANTAI DAN DINDING 115,808,864.60 8.793 4.396 4.396

50%
VI. PEKERJAAN ATAP 62668719.425 4.758 2.379 2.379

VII. PEKERJAAN PLAFOND 50,557,029.52 3.838 1.919 1.919

VIII. PEKERJAAN KUSEN PINTU DAN JENDELA 25,573,797.63 1.942 0.971 0.971

IX PEKERJAAN PENGECATAN 47,996,791.08 3.644 1.822 1.822

X PEKEKERJAAN INSTALASI LISTRIK 39,250,478.00 2.980 2.980

XI. PEKEKERJAAN SANITASI 51,740,941.68 3.928 3.928 3.928

XII. PEKEKERJAAN FINISHING 3,000,000.00 0.228 0.228 0%


Total 1,317,121,058.43 100

Rencana Fisik per Minggu 1.965 1.965 3.488 3.488 4.366 4.366 4.366 7.430 11.827 11.827 17.688 18.450 8.108 4.366 0.228

Rencana Fisik Komulatif 1.965 3.931 7.418 10.906 15.272 19.639 24.005 31.435 43.262 55.088 72.777 91.226 99.334 103.701 103.928

DiPERIKSA

…....................
ASISTEN DOSEN
Merauke, NOVEMBER 2020
Dibuat Oleh
ESTIMATOR

AGUS PUTRA LAKSONO


2018-22-201-003
H
100.000

90.000

80.000

70.000

60.000

50.000

40.000

30.000

20.000

10.000

0.000
1 2 3 4 5 6 7 8 9 10 11 12 13

Merauke, NOVEMBER 2020


Dibuat Oleh
ESTIMATOR

AGUS PUTRA LAKSONO


2018-22-201-003
Bobot JAM
NO URAIAN PEKERJAAN
(%) HARI 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 6,099,375.00 0.464 2 0.232 0.232
2 Pemasangan Papan Nama Proyek 1,000,000.00 0.076 1 0.076
3 Gudang Semen dan Peralatan 40,403,406.12 3.073 5 0.615 0.615 0.615 0.615 0.615
4 Pengukuran dan Pemasangan Bouwplank 4,268,801.66 0.325 3 0.081 0.081 0.081 0.081
II. PEKERJAAN TANAH DAN PASIR
1 Galian Tanah Pondasi 6,408,149.76 0.487 2 0.244 0.244
2 Urugan Tanah Kembali 818,805.76 0.062 2 0.031 0.031
3 Urugan Tanah Peninggian Lantai 59,272,319.40 4.509 6 0.751 0.751 0.751 0.751 0.751 0.751
4 Urugan Pasir Bawah Pondasi 12,749,693.76 0.970 2 0.485 0.485
5 Urugan Pasir Bawah Lantai 12,621,594.00 0.960 4 0.240 0.240 0.240 0.240
III. PEKERJAAN PONDASI DAN BETON
1 Lantai Kerja Tebal 10 cm 8,978,877.01 0.683 2 0.341 0.341
2 Pondasi Poer B. Bertulang 63,714,696.94 4.847 3 1.62 1.62 1.62
3 Pas. Pondasi Batu Bata 115,226,805.80 8.765 7 1.252 1.252 1.252 1.252 1.252 1.252 1.252
4 Sloof B.Bertulang 20 x 30 cm 53,765,324.58 4.090 6 0.682 0.682 0.682 0.682 0.682 0.682
5 Kolom Utama 15 x 20 B. Bertulang 72,366,113.66 5.505 8 0.688 0.688 0.688 0.688
6 Kolom Praktis 15 x 15 B. Bertulang 21,182,493.35 1.611 8 0.201 0.201 0.201 0.201
7 Balok Utama 20 x 40 cm B. Bertulang 76,126,628.45 5.791 6 0.965
8 Ring Balk 15 x 20 cm B. Bertulang 56,956,778.78 4.333 6
9 Cor Plat Lantai Tebal 12 cm 53,158,469.03 4.044 6 0.674
10 Cor Tangga Beton B. Bertulang 26,582,813.44 2.022 6
11 Cor Plat Dak Tebal 12 cm 27,052,640.53 2.058 5
IV. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Dinding 1/2 Bata 20,158,257.95 1.533 8
2 Plesteran Tebal 20 mm 154,937,308.76 11.786 8
3 Cor Lantai, Tebal : 5 cm 26,675,082.77 2.029 2
V. PEKERJAAN LANTAI DAN DINDING
1 Pas. Lantai Keramik Uk. 60 x 60 cm 89,566,914.38 6.813 6
2 Pas. Lantai Keramik Tangga Uk. 30 x 30 cm 1,707,471.77 0.130 1
3 Pas. Lantai Keramik KM/WC Uk. 20 x 20 cm 5,767,434.52 0.439 1
4 Pas. Dinding Keramik KM/WC Uk. 20 x 20 cm, tinggi : 1,2 m 18,767,043.93 1.428 2
VI. PEKERJAAN ATAP
1 Pas. Rangka Kuda-kuda & Skor 5/8 cm (Kayu Klas II ) 21,267,222.01 1.618 1
2 Pas. Gording 5/8 cm ( Kayu Klas II ) 16,474,889.91 1.253 1
3 Pas. Atap Seng Gelombang BJLS 0.20 mm 20,773,437.30 1.580 1
4 Pas. Lisplank Kayu Kelas II 4,153,170.21 0.316 1
VII. PEKERJAAN PLAFOND
1 Pas. Rangka Plafond Kayu 5/5 cm 35,297,981.36 2.685 3
2 Pas. Plafond Gypsum t : 9 mm 15,259,048.16 1.161 2
VIII. PEKERJAAN KUSEN PINTU DAN JENDELA
1 Pas. Kusen Pintu Dan Jendela 15,065,377.30 1.146 2
2 Luasan Jendela ( J1) 1,553,888.58 0.118 2
3 Luasan Jendela ( J2) 1,437,346.94 0.109 2
4 Pas. Pintu Panil Kayu ( 80 x 210 cm ) ( P1) 3,560,471.67 0.271 2
5 Pas. Pintu Panil Lapis Seng Lat Bagian Dalam ( 70 x 210 cm ) 1,466,076.57 0.112 2
IX. PEKERJAAN PENGECATAN
1 Cat Meny Kayu 2,597,520.04 0.198 1
2 Cat Kilap Kayu 3,248,503.43 0.247 1
3 Cat Tembok untuk Dinding 33,502,883.62 2.548 3
4 Cat Plafon 8,647,884.00 0.658 4
X. PEKEKERJAAN INSTALASI LISTRIK
1 Lampu XL 23 Watt 5,105,011.00 0.388 2
2 Lampu XL 14 Watt 2,104,570.00 0.160 1
3 Saklar Ganda 1,990,584.00 0.151 1
4 Saklar Tunggal 4,224,272.00 0.321 2
5 Stop Kontak 1,694,736.00 0.129 1
6 Sekring Case 19,131,305.00 1.455 3
7 Biaya Penyambungan Listrik 5,000,000.00 0.380 1
XI. PEKEKERJAAN SANITASI
1 Bak air 16,332,037.40 1.242 2
2 Pasangan Closet Jongkok Porcelin 11,309,755.00 0.860 1
3 Septictank ukuran 1,5 x 2 x 1,5 m, Pas. 1/2 Bata 1PC : 3PS 18,579,857.76 1.413 5
4 Memasang Pipa PVC Tipe AW Dia. 3/4" 1,259,609.40 0.096 1
5 Memasang Pipa PVC Tipe AW Dia. 4" 2,644,314.55 0.201 1
6 Kran air Dia. 3/4" atau 1/2" 613,490.00 0.047 1
7 Pompa dragon/pompa tangan 1,001,877.57 0.076 2
XII. PEKEKERJAAN FINISHING
1 Pembersihan Akhir 3,000,000.00 0.228 5
TOTAL ( % ) 1,314,630,421.86 100
Rencana Fisik Per Hari 0.232 0.232 0.691 0.696 0.696 0.696 1.181 0.729 0.585 0.341 1.616 1.616 1.616 1.252 1.252 1.252 1.283 1.252 1.252 1.283 1.433 1.433 1.433 1.433 1.433 1.433 1.130 1.130 1.130 1.130 1.639
Rencana Fisik Komulatif 0.232 0.464 1.155 1.851 2.546 3.242 4.423 5.152 5.737 6.078 7.694 9.309 10.925 12.177 13.429 14.681 15.965 17.217 18.469 19.752 21.185 22.618 24.051 25.485 26.918 28.351 29.480 30.610 31.739 32.869 34.508
WAKTU PELAKSANA ( HARI )
32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79

0.688 0.688 0.688 0.688


0.201 0.201 0.201 0.201
0.965 0.965 0.965 0.965 0.965
0.722 0.722 0.722 0.722 0.722 0.722
0.674 0.674 0.674 0.674 0.674
0.337 0.337 0.337 0.337 0.337 0.337
0.4116 0.4116 0.4116 0.4116 0.4116

0.192 0.192 0.192 0.192 0.192 0.192 0.192 0.192


1.473 1.473 1.473 1.473 1.473 1.473 1.473 1.473
1.015 1.015

1.136 1.136 1.136 1.136 1.136 1.136


0.130
0.439
0.714 0.714

1.618
1.253
1.580
0.316

0.895 0.895 0.895


0.5804 0.5804

0.573 0.573
0.118
0.055 0.055
0.135 0.135
0.056 0.056

0.198
0.247
0.849 0.849 0.849
0.164 0.164 0.164 0.164

0.194 0.194

0.6212 0.6212
0.860
0.283 0.283 0.283 0.283 0.283
0.096
0.201
0.047

1.639 1.639 1.639 1.639 1.639 1.172 1.172 1.172 1.172 1.533 1.251 1.872 1.872 2.111 1.347 0.393 0.238 1.885 1.885 1.885 1.885 1.885 1.473 2.488 2.488 1.136 1.136 2.031 3.611 5.217 1.716 0.710 1.012 1.341 0.887 0.135 0.135 0.056 0.056 0.198 0.247 0.849 0.849 0.849 0.164 0.164 0.359 0.359
36.147 37.786 39.425 41.064 42.703 43.875 45.047 46.220 47.392 48.925 50.176 52.048 53.920 56.031 57.377 57.770 58.009 59.893 61.778 63.663 65.548 67.432 68.906 71.393 73.881 75.017 76.152 78.183 81.793 87.011 88.727 89.437 90.449 91.790 92.677 92.812 92.947 93.003 93.059 93.257 93.504 94.353 95.203 96.052 96.217 96.381 96.740 97.098
Keterangan
80 81 82 83 84 85 86 87 88 89 90

0.160
0.151
0.161 0.161
0.129
0.485 0.485 0.485
0.380

0.038 0.038

0.046 0.046 0.046 0.046 0.046

0.321 0.312 0.614 0.485 0.485 0.418 0.084 0.046 0.046 0.046 0.046
97.419 97.731 98.345 98.830 99.315 99.734 99.817 99.863 99.909 99.954 100
Bobot JAM
NO URAIAN PEKERJAAN
(%) HARI 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 6,099,375.00 0.464 2 0.232 0.232
2 Pemasangan Papan Nama Proyek 1,000,000.00 0.076 1 0.076
3 Gudang Semen dan Peralatan 40,403,406.12 3.073 5 0.615 0.615 0.615 0.615 0.615
4 Pengukuran dan Pemasangan Bouwplank 4,268,801.66 0.325 3 0.081 0.081 0.081 0.081
II. PEKERJAAN TANAH DAN PASIR
1 Galian Tanah Pondasi 6,408,149.76 0.487 2 0.244 0.244
2 Urugan Tanah Kembali 818,805.76 0.062 2 0.031 0.031
3 Urugan Tanah Peninggian Lantai 59,272,319.40 4.509 6 0.751 0.751 0.751 0.751 0.751 0.751
4 Urugan Pasir Bawah Pondasi 12,749,693.76 0.970 2 0.485 0.485
5 Urugan Pasir Bawah Lantai 12,621,594.00 0.960 4 0.240 0.240 0.240 0.240
III. PEKERJAAN PONDASI DAN BETON
1 Lantai Kerja Tebal 10 cm 8,978,877.01 0.683 2 0.341 0.341
2 Pondasi Poer B. Bertulang 63,714,696.94 4.847 3 1.62 1.62 1.62
3 Pas. Pondasi Batu Bata 115,226,805.80 8.765 7 1.252 1.252 1.252 1.252 1.252 1.252 1.252
4 Sloof B.Bertulang 20 x 30 cm 53,765,324.58 4.090 6 0.682 0.682 0.682 0.682 0.682 0.682
5 Kolom Utama 15 x 20 B. Bertulang 72,366,113.66 5.505 8 0.688 0.688 0.688 0.688
6 Kolom Praktis 15 x 15 B. Bertulang 21,182,493.35 1.611 8 0.201 0.201 0.201 0.201
7 Balok Utama 20 x 40 cm B. Bertulang 76,126,628.45 5.791 6
8 Ring Balk 15 x 20 cm B. Bertulang 56,956,778.78 4.333 6
9 Cor Plat Lantai Tebal 12 cm 53,158,469.03 4.044 6
10 Cor Tangga Beton B. Bertulang 26,582,813.44 2.022 6
11 Cor Plat Dak Tebal 12 cm 27052640.5344 2.058 5
IV. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Dinding 1/2 Bata 20,158,257.95 1.533 8
2 Plesteran Tebal 20 mm 154,937,308.76 11.786 8
3 Cor Lantai, Tebal : 5 cm 26,675,082.77 2.029 2
V. PEKERJAAN LANTAI DAN DINDING
1 Pas. Lantai Keramik Uk. 60 x 60 cm 89,566,914.38 6.813 6
2 Pas. Lantai Keramik Tangga Uk. 20 x 20 cm 1,707,471.77 0.130 1
3 Pas. Lantai Keramik KM/WC Uk. 20 x 20 cm 5,767,434.52 0.439 1
4 Pas. Dinding Keramik KM/WC Uk. 20 x 20 cm, tinggi : 1,2 m 18,767,043.93 1.428 2
VI. PEKERJAAN ATAP
1 Pas. Rangka Kuda-kuda & Skor 5/8 cm (Kayu Klas II ) 21,267,222.01 1.618 1
2 Pas. Gording 5/8 cm ( Kayu Klas II ) 16,474,889.91 1.253 1
3 Pas. Atap Seng Gelombang BJLS 0.20 mm 20,773,437.30 1.580 1
4 Pas. Lisplank Kayu Kelas II 4,153,170.21 0.316 1
VII. PEKERJAAN PLAFOND
1 Pas. Rangka Plafond Kayu 5/5 cm 35,297,981.36 2.685 3
2 Pas. Plafond Gypsum t : 9 mm 15,259,048.16 1.161 2
VIII. PEKERJAAN KUSEN PINTU DAN JENDELA
1 Pas. Kusen Pintu Dan Jendela 15,065,377.30 1.146 2
2 Luasan Jendela ( J1) 1,553,888.58 0.118 2
3 Luasan Jendela ( J2) 1,437,346.94 0.109 2
4 Pas. Pintu Panil Kayu ( 80 x 210 cm ) ( P1) 3,560,471.67 0.271 2
5 Pas. Pintu Panil Lapis Seng Lat Bagian Dalam ( 70 x 210 cm ) 1,466,076.57 0.112 2
IX. PEKERJAAN PENGECATAN
1 Cat Meny Kayu 2,597,520.04 0.198 1
2 Cat Kilap Kayu 3,248,503.43 0.247 1
3 Cat Tembok untuk Dinding 33,502,883.62 2.548 3
4 Cat Plafon 8,647,884.00 0.658 4
X. PEKEKERJAAN INSTALASI LISTRIK
1 Lampu XL 23 Watt 5,105,011.00 0.388 2
2 Lampu XL 14 Watt 2,104,570.00 0.160 1
3 Saklar Ganda 1,990,584.00 0.151 1
4 Saklar Tunggal 4,224,272.00 0.321 2
5 Stop Kontak 1,694,736.00 0.129 1
6 Sekring Case 19,131,305.00 1.455 3
7 Biaya Penyambungan Listrik 5,000,000.00 0.380 1
XI. PEKEKERJAAN SANITASI
1 Bak air 16,332,037.40 1.242 2
2 Pasangan Closet Jongkok Porcelin 11,309,755.00 0.860 1
3 Septictank ukuran 1,5 x 2 x 1,5 m, Pas. 1/2 Bata 1PC : 3PS 18,579,857.76 1.413 5
4 Memasang Pipa PVC Tipe AW Dia. 3/4" 1,259,609.40 0.096 1
5 Memasang Pipa PVC Tipe AW Dia. 4" 2,644,314.55 0.201 1
6 Kran air Dia. 3/4" atau 1/2" 613,490.00 0.047 1
7 Pompa dragon/pompa tangan 1,001,877.57 0.076 2
XII. PEKEKERJAAN FINISHING
1 Pembersihan Akhir 3,000,000.00 0.228 5
TOTAL ( % ) 1,314,630,421.86 100
Rencana Fisik Per Hari 0.232 0.232 0.691 0.696 0.696 0.696 1.181 0.729 0.585 0.341 1.616 1.616 1.616 1.252 1.252 1.252 1.283 1.252 1.252 1.283 1.433 1.433 1.433 1.433 1.433 1.433 1.130 1.130 1.130 1.130
Rencana Fisik Komulatif 0.232 0.464 1.155 1.851 2.546 3.242 4.423 5.152 5.737 6.078 7.694 9.309 10.925 12.177 13.429 14.681 15.965 17.217 18.469 19.752 21.185 22.618 24.051 25.485 26.918 28.351 29.480 30.610 31.739 32.869
WAKTU PELAKSANA ( HARI )
31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78

0.688 0.688 0.688 0.688


0.201 0.201 0.201 0.201
0.965 0.965 0.965 0.965 0.965 0.965
0.722 0.722 0.722 0.722 0.722 0.722
0.674 0.674 0.674 0.674 0.674 0.674
0.337 0.337 0.337 0.337 0.337 0.337
0.4116 0.4116 0.4116 0.4116 0.4116

0.192 0.192 0.192 0.192 0.192 0.192 0.192 0.192


1.473 1.473 1.473 1.473 1.473 1.473 1.473 1.473
1.015 1.015

1.136 1.136 1.136 1.136 1.136 1.136


0.130
0.439
0.714 0.714

1.618
1.253
1.580
0.316

0.895 0.895 0.895


0.5804 0.5804

0.573 0.573
0.118
0.055 0.055
0.135 0.135
0.056 0.056

0.198
0.247
0.849 0.849 0.849
0.164 0.164 0.164

0.194

0.6212 0.6212
0.860
0.283 0.283 0.283 0.283 0.283
0.096
0.201
0.047
1.639 1.639 1.639 1.639 1.639 1.639 1.172 1.172 1.172 1.172 1.533 1.251 1.872 1.872 2.111 1.347 0.393 0.238 1.885 1.885 1.885 1.885 1.885 1.473 2.488 2.488 1.136 1.136 2.031 3.611 5.217 1.716 0.710 1.012 1.341 0.887 0.135 0.135 0.056 0.056 0.198 0.247 0.849 0.849 0.849 0.164 0.164 0.359
34.508 36.147 37.786 39.425 41.064 42.703 43.875 45.047 46.220 47.392 48.925 50.176 52.048 53.920 56.031 57.377 57.770 58.009 59.893 61.778 63.663 65.548 67.432 68.906 71.393 73.881 75.017 76.152 78.183 81.793 87.011 88.727 89.437 90.449 91.790 92.677 92.812 92.947 93.003 93.059 93.257 93.504 94.353 95.203 96.052 96.217 96.381 96.740
Keterangan
79 80 81 82 83 84 85 86 87 88 89 90

0.164

0.194
0.160
0.151
0.161 0.161
0.129
0.485 0.485 0.485
0.380

0.038 0.038

0.046 0.046 0.046 0.046 0.046


0.359 0.321 0.312 0.614 0.485 0.485 0.418 0.084 0.046 0.046 0.046 0.046
97.098 97.419 97.731 98.345 98.830 99.315 99.734 99.817 99.863 99.909 99.954 100
TABEL PERHITUNGAN KE DEPAN EET

NO.
KEGIATAN EETi DURASI EETj KETERANGAN
KEJADIAN
1 A 0 2 2 -

2 B 2 2 4 -

3 C 4 3 7 -

4 D 7 1 8 -

5 E 10 1 11 Terbesar,yaitu 15

6 F 10 2 12 -

7 G 8 2 10 -

8 H 14 1 15 DUMMY

9 I 15 2 17 Diambil nilai

10 J 12 2 14 -

11 K 2 8 10 -

12 L 11 1 12 -
TABEL PERHITUNGAN KE BELAKANG LET

NO.
KEGIATAN LETi DURASI LETj KETERANGAN
KEJADIAN
1 A 0 2 1 -

2 B 2 2 1 Terkecil,yaitu -1
Diambil nilai
3 C 4 3 3 DUMMY

4 D 7 1 6

5 E 10 1 9 -

6 F 4 2 2 -

7 G 8 2 6 -

8 H 8 1 7 -

9 I 9 2 7 -

10 J 6 2 4 -

11 K 2 8 -6

12 L 11 1 10
-
TABEL PERHITUNGAN FREE FLOAT DAN TOTAL FROAT

KEGIATAN KEGIATAN FREE TOTAL


KEGIATAN DURASI
EETi LETi EETj LETj FLOAT FLOAT
A 0 2 2 0 1 -2 -1

B 2 4 2 2 1 -2 -2

C 4 7 3 4 3 -3 -3

D 7 8 1 7 6 -1 -1

E 10 11 1 10 9 -1 0

F 10 12 2 4 2 -8 -8

G 8 10 2 8 6 -2 -2

H 14 15 1 8 7 -7 -7

I 15 17 2 9 7 -8 -8

J 12 14 2 6 4 -8 -8

K 2 10 8 2 -6 -8 -8

L 11 12 1 11 10 -1 -1
GANT CHART

BULAN KE 1 BULAN KE 2 BULAN KE 3

NO JENIS PEKERJAAN MINGGU KE MINGGU KE MINGGU KE KETERANGAN


1 2 3 4 1 2 3 4 1 2 3 4

I. PEKERJAAN PERSIAPAN

II. PEKERJAAN TANAH DAN PASIR

III. PEKERJAAN PONDASI DAN BETON

VI. PEKERJAAN PASANGAN DAN PLESTERAN

V. PEKERJAAN LANTAI DAN DINDING

VI. PEKERJAAN ATAP

VII. PEKERJAAN PLAFOND

VIII. PEKERJAAN KUSEN PINTU DAN JENDELA

IX PEKERJAAN PENGECATAN

X PEKEKERJAAN INSTALASI LISTRIK

XI. PEKEKERJAAN SANITASI

XII. PEKEKERJAAN FINISHING


TIME SCHEDULE " KURVA S "

BULAN KE 1 Chart BULAN


Title KE 2 BULAN KE 3
BOBOT MINGGU KE MINGGU KE MINGGU KE
NO JENIS PEKERJAAN (%) KETERANGAN
1 2 3 4 1 2 3 4 1 2 3 4

I. PEKERJAAN PERSIAPAN 3.931 3.931


100%

II. PEKERJAAN TANAH DAN PASIR 6.975 3.488 3.488

III. PEKERJAAN PONDASI DAN BETON 43.664 7.277 7.277 7.277 7.277 7.277 7.277

VI. PEKERJAAN PASANGAN DAN PLESTERAN 15.319 5.106 5.106 5.106

V. PEKERJAAN LANTAI DAN DINDING 8.793 4.396 4.396

50%
VI. PEKERJAAN ATAP 4.758 4.758

VII. PEKERJAAN PLAFOND 3.838 3.838

VIII. PEKERJAAN KUSEN PINTU DAN JENDELA 1.942 0.971 0.971

IX PEKERJAAN PENGECATAN 3.644 3.644

X PEKEKERJAAN INSTALASI LISTRIK 2.980 2.980

XI. PEKEKERJAAN SANITASI 3.928 3.928

XII. PEKEKERJAAN FINISHING 0.228 0.228 0%


Total 100

Rencana Fisik per Minggu 3.931 3.488 10.765 7.277 11.206 12.384 16.780 17.751 8.709 3.838 3.644 0.228

Rencana Fisik Komulatif 3.931 7.418 18.183 25.461 36.666 49.050 65.830 83.581 92.290 96.128 99.772 100