NAMA PROYEK :
LOKASI PROYEK :
TAHUN ANGGALAN :
NAMA PROYEK :
LOKASI PROYEK :
TAHUN ANGGARAN :
URAIAN
KODE ANALISA SATUAN
KOEFISIEN SATUAN NAMA ITEM
A 0 M2 Pembersihan Lapangan
K.35 M2 Pengeteran/Residu
Rp 682.50
Rp 17,137.50
Rp 17,670.00
Rp 6,397.50
Rp 56,797.50
Rp 108,000.00
Rp 358,560.00
Rp 1,997,692.50
Rp 468,250.00
Rp 22,440.00
Rp 334,700.00
Rp 21,850.00
Rp 99,925.00
Rp 2,521,500.00
Rp 2,121,000.00
Rp 60,845.00
Rp 197,615.00
Rp 68,925.00
Rp 225,615.00
Rp 257,000.00
Rp 50,000.00
Rp 116,250.00
Rp 454,250.00
Rp 76,270.00
Rp 23,465.00
Rp 20,440.00
Rp 4,975.00
Rp 426,500.00
Rp 35,725.00
ANALISA SATUAN PEKERJAAN
NAMA PROYEK :
LOKASI PROYEK :
TAHUN ANGGARAN :
II PEKERJAAN TANAH
Galian Tanah M3 A.1 41.50
Urugan Kembali M3 1/2A.1 37.60
Urugan Pasir Bawah Lantai/Bawah Pondasi M3 A. 18 12.63
IV PEKERJAAN KAYU
Kap Kuda-Kuda Gording M3 F.22 1.50
Kusen Pintu/Jendela M3 F.27 0.67
Kap Kuda-Kuda Gording M3 F.22 3.78
Jendela Kaca Rangka Kayu (Kaca Mati) M2 F.36.c (1) 1.13
Plafond Tripleks M3 F.1.a+F.37 240.00
Pintu Doubel Tripleks M2 F.36.1 3.30
Pintu Doubel Tripleks Lapis Seng M2 F.36.b 3.40
Jendela Kaca Rangka Kayu M2 F.36c (2) 2.12
Kusen Pintu/Jendela M3 F.27 0.86
V PEKERJAAN ATAP
Atap Seng Gelombang M2 H.8.a 238.80
Bubungan Seng Plat 10M H.10.a 46.60
Pekerjaan Talang 10M H.17 47.00
List Plank M2 F.21 10.00
VI PEKERJAAN KUNCI/PENGGANTUNG
Kunci Tanam Lengkap Buah MT032 4.00
Engsel Pintu Buah MT033 8.00
Engsel Jendela Buah MT034 4.00
Grendel Pintu Buah MT035 4.00
Grendel Jendela Buah MT036 2.00
Angkur/Baut/Sengkang Buah MT037 48.00
Kait Angin Buah MT038 2.00
IX PEKERJAAN LISTRIK
Titik Lampu Buah MT044 12.00
Stop Kontak Buah MT045 3.00
Saklar Buah MT046 4.00
Sekring Kast Lokal Buah MT047 1.00
N PEKERJAAN
Rp 1,691,203.43
Rp 17,670.00 Rp 733,305.00
Rp 6,397.50 Rp 240,546.00
Rp 56,797.50 Rp 717,352.43
Rp 32,475,913.40
Rp 108,000.00 Rp 671,760.00
Rp 358,560.00 Rp 5,450,112.00
Rp 1,997,692.50 Rp 6,552,431.40
Rp 468,250.00 Rp 1,123,800.00
Rp 22,440.00 Rp 762,960.00
Rp 334,700.00 Rp 2,209,020.00
Rp 21,850.00 Rp 2,403,500.00
Rp 99,925.00 Rp 11,791,150.00
Rp 68,925.00 Rp 137,850.00
Rp 426,500.00 Rp 1,373,330.00
Rp 31,444,942.50
Rp 2,121,000.00 Rp 3,181,500.00
Rp 2,521,500.00 Rp 1,689,405.00
Rp 2,121,000.00 Rp 8,017,380.00
Rp 257,000.00 Rp 290,410.00
Rp 60,845.00 Rp 14,602,800.00
Rp 197,615.00 Rp 652,129.50
Rp 225,615.00 Rp 767,091.00
Rp 35,725.00 Rp 75,737.00
Rp 2,521,500.00 Rp 2,168,490.00
Rp 39,469,700.00
Rp 50,000.00 Rp 11,940,000.00
Rp 116,250.00 Rp 5,417,250.00
Rp 454,250.00 Rp 21,349,750.00
Rp 76,270.00 Rp 762,700.00
Rp 545,000.00
Rp 23,000.00 Rp 92,000.00
Rp 12,500.00 Rp 100,000.00
Rp 12,500.00 Rp 50,000.00
Rp 12,500.00 Rp 50,000.00
Rp 6,000.00 Rp 12,000.00
Rp 4,500.00 Rp 216,000.00
Rp 12,500.00 Rp 25,000.00
Rp 810,000.00
Rp 100,000.00 Rp 200,000.00
Rp 120,000.00 Rp 240,000.00
Rp 20,000.00 Rp 20,000.00
Rp 10,000.00 Rp 200,000.00
Rp 10,000.00 Rp 150,000.00
Rp 10,595,260.00
Rp 20,440.00 Rp 6,724,760.00
Rp 23,465.00 Rp 2,815,800.00
Rp 4,975.00 Rp 1,054,700.00
Rp 160,000.00
Rp 5,000.00 Rp 60,000.00
Rp 15,000.00 Rp 45,000.00
Rp 10,000.00 Rp 40,000.00
Rp 15,000.00 Rp 15,000.00
REKAPITULASI
I PEKERJAAN PERSIAPAN Rp 2,585,130.00
II PEKERJAAN TANAH Rp 1,691,203.43
III PEKERJAAN BATU ATAU BETON Rp 32,475,913.40
IV PEKERJAAN KAYU Rp 31,444,942.50
V PEKERJAAN ATAP Rp 39,469,700.00
VI PEKERJAAN KUNCI/PENGGANTUNG Rp 545,000.00
VII PEKERJAAN SANITAIR Rp 810,000.00
VIII PEKERJAAN PENGECETAN Rp 10,595,260.00
IX PEKERJAAN LISTRIK Rp 160,000.00
JUMLAH (I+II+III+IV+V+VI+VII+VIII+IX) Rp 119,777,149.33
PPN 10% Rp 11,977,714.93
TOTAL (JUMLAH +PPN) Rp 131,754,864.26
DIBULATKAN Rp 131,755,000.00
DAFTAR LOGIKA KETERGANTUNGAN
RENCANA ANGGARAN BIAYA (RAB)
BANGUNAN FASILITAS UMUM DAN RUMAH PETUGAS
13 25 T
40 5
W
4
60
23 60
43 Z
18 53 2
Y 3
T 30 U 15 32 V 16 38 X 40
14 17
5 45 2 47 6 53 2 55
60
FLOAT TIME
RENCANA ANGGARAN BIAYA (RAB)
BANGUNAN FASILITAS UMUM DAN RUMAH PETUGAS
A Pembersihan Lapngan 1 -
B Pembuatan direksi keet 3 A
C Pengukuran bouwplank 2 A
D Galian Tanah 5 B,C
E Pasangan batu kosong bawah pondasi 3 D
F Pasangan pondasi batu kali 4 E
G Pembuatan sloof dan kolom beton bertulang 28 F
H Urugan tanah bawah lantai & urugan pondasi 2 F
I Urugan pasir bawah lantai & urugan bertulang 2 H
J Pembuatan kolom kayu 2 B,C
K Pasangan trasram batu bata 3 G
L Pasangan dinding batu bata 7 G
M Pembuatan dan pemasangan kusen pintu & jendela 5 K,L
N Lantai beton tumbuk 3 I
O Pekerjaan kuda-kuda dan gording 4 C
P Pekerjaan pintu double tripleks 1 J,O
Q Pekerjaan jendela kaca 1 J,O
R Pekerjaan kunci/penggantung 3 Q
S Pekerjaan Plasteran 2 N,P,Q
T Pekerjaan atap 5 S
U Pekerjaan sanitair 2 T
V Pekerjaan lantai tegel dan ubin wafel 6 U
W Pekerjaan listrik 4 M
X Pekerjaan plafond 2 V
Y Pagar jalusi,papan assesories 3 X
Z Pekerjaan pengecatan 2 Y
60
KEGIATAN YANG
EARLIST LATEST
MENGIKUTI FLOAT
ES EF LS LF TF FF KETERANGAN
B,C 0 1 0 1 0 0 Kegiatan Kritis
D,J 1 4 1 4 0 0 Kegiatan Kritis
D,J,O 1 3 1 30 27 0 Non Kritis
E 4 9 4 9 0 0 Kegiatan Kritis
F 9 12 9 12 0 0 Kegiatan Kritis
G,H 12 16 12 16 0 0 Kegiatan Kritis
K,L 16 44 16 44 0 0 Kegiatan Kritis
I 16 18 16 33 15 0 Non Kritis
N 18 20 33 35 15 0 Non Kritis
P,Q 4 7 4 34 28 1 Non Kritis
M 44 51 44 51 4 4 Non Kritis
M 44 51 44 51 0 0 Kegiatan Kritis
W 51 56 51 56 0 0 Kegiatan Kritis
S 20 23 35 38 15 0 Non Kritis
P,Q 3 7 30 34 27 0 Non Kritis
S 7 23 34 38 30 15 Non Kritis
R 7 8 34 35 27 0 Non Kritis
S 8 23 35 38 27 12 Non Kritis
T 23 25 38 40 15 0 Non Kritis
U 25 30 40 45 15 0 Non Kritis
V 30 32 45 47 15 0 Non Kritis
X 32 38 47 53 15 0 Non Kritis
- 56 60 56 60 0 0 Kegiatan Kritis
Y 38 40 53 55 15 0 Non Kritis
Z 40 43 55 58 15 0 Non Kritis
- 43 60 58 60 15 15 Non Kritis