DAFTAR HARGA UPAH DAN BAHAN

KABUPATEN ACEH UTARA

HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

A. UPAH
1 Kepala Tukang Hari 120,000.00
2 Mandor Hari 90,000.00
3 Pekerja Hari 68,000.00
4 Tukang Hari 100,000.00

B. BAHAN
1 Air Liter 50.00
2 Atap Seng Genteng Metal 0,30 Lembar 70,000.00
3 Batu Bata Buah 750.00
Balok Kayu Kelas I M3 11,859,375.00
Balok Kayu Kelas II M3 7,115,625.00
4 Batu Kali/Batu Belah (Sungai/Gunung) 15/20 Cm M3 287,500.00
5 Batu Belah 5/7 Cm M3 442,750.00
6 Besi Beton Polos Kg 15,275.00
7 Besi Beton Ulir Kg 18,299.00
8 Besi Strip Tebal 5 mm Kg 18,000.00
9 Cat Dasar Kg 32,890.00
10 Cat Tembok Extana Avitek Kg 23,403.00
11 Cat Kayu/Minyak Kg 51,750.00
12 Cat Menie Besi Kg 55,344.00
13 Kayu Bakau/Dolken Kayu Ø 8 - 10, 4 Meter Batang 20,000.00
14 Engsel Jendela 3" Pasang 18,975.00
15 Engsel Pintu 4" Pasang 23,719.00
16 Gypsum Tebal 9 mm Lembar 94,875.00
17 Kaca Bening Tebal 5 mm M2 154,172.00
18 Kait Angin Buah 15,813.00
19 Kawat Beton Kg 21,491.00
20 Kayu Klas I (Semantok/Damar Laut) M3 8,855,000.00
21 Kayu Klas II (Merantee/Kruing) M3 6,957,500.00
22 Kayu Klas III (Semaram/Borneo/dll) untuk Bekesting M3 5,000,000.00
23 Kayu Klas IV (Sengon/dll) untuk Bouwplank M3 5,000,000.00
24 Keramik 20 x 20 Cm Buah 2,833.60
25 Keramik 40 x 40 Cm Homogenius Polished Buah 13,156.00
26 Keramik 40 x 40 Cm Homogenius Unpolished Buah 13,156.00
27 Keramik 30 x 30 Cm Homogenius Polished Buah 4,667.85
28 Keramik 30 x 30 Cm Homogenius Unpolished Buah 6,831.00
29 Keramik Dinding 20 x 25 Cm Buah 3,660.00
30 Keramik Sisi Kulit Jeruk 20 x 20 Cm Buah 2,833.60
31 Kerikil Beton/Bersih M3 265,000.00
32 Kerikil Beton/Bersih (1.350 Kg/M3) Kg 196.30
33 Kertas Amplas Lembar 6,279.00
34 Kunci Pintu Buah 145,475.00
35 Lem Kayu Kg 39,531.00
36 List Profil Triplek M' 7,700.00
37 Minyak Bekisting Liter 5,000.00
HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)

38 Paku Kayu Biasa Kg 25,300.00


39 Paku Triplek Kg 25,300.00
40 Paku Seng Kg 28,463.00
41 Paku Skrup Kg 31,625.00
42 Pasir Beton M3 250,000.00
43 Pasir Beton (1.400 Kg/M3) Kg 178.57
44 Pasir Pasang M3 250,000.00
45 Pasir Pasang (1.400 Kg/M3) Kg 178.57
46 Pasir Urug M3 200,000.00
47 Pemasangan Titik Lampu + Instalasi Titik 94,875.00
48 Plamir Kg 18,975.00
49 Plywood form 4 mm Lembar 83,490.00
50 Plywood form 9 mm Lembar 187,220.00
51 Rabung Seng Genteng Metal 0,3 Lembar 63,250.00
52 Rabung Seng 0,30 Lembar 33,249.00
53 Semen Portland @ 40 Kg Zak 65,000.00
54 Semen Porland Kg 1,625.00
55 Semen Warna @ 50 Kg Zak 247,070.00
56 Semen Warna Kg 4,941.40
57 Seng Superdeck 8 Kaki Lembar 153,951.00
58 Seng Gelombang Bjls. 0,2 Lembar 67,045.00
59 Seng Plat Bjls. 0,2 Lembar 60,720.00
60 Tanah Timbun M3 80,000.00
61 Triplek 4 MM Lembar 75,000.00

Mengatahui/menyetujui Banda Aceh, April 2015


Ketua Pengguna Anggaran (KPA) Konsultan Perencana
Kepala Bidang Pendidikan Prasekolah CV. BINA ENGINEERING COMSULTANT
Dasar dan Lanjutan
Dinas Pendidikan Provinsi Aceh

Bahrum Yacob, S.Pd Nurizal. ST


Pembina TK.I/Nip. 19591231 197910 1 014 Direktur
LAMPIRAN PERHITUNGAN LUAS BEKISTING PER METER KUBIT BETON

VOLUME/KELILING JUMLAH
NO. URAIAN BANYAK JUMLAH
P (M) L (M) T (M) T' (M) DIBULATKAN

1 Kolom 15 x 15 Cm
Beton 0.150 0.150 0.023 M2
1 M3 Dibagi Dengan Jumlah 1.000 44.444 M1

Bekisting 0.150 0.150 0.150 0.150 0.600 M1

Jumlah Panjang Beton x Panjang Bekisting 26.667 M2


Asumsi 2 Kali Pemakaian Bekisting 2.000 13.333 M2 13.333 M2

2 Kolom 13 x 13 Cm
Beton 0.130 0.130 0.017 M2
1 M3 Dibagi Dengan Jumlah 1.000 59.172 M1

Bekisting 0.130 0.130 0.260 M1

Jumlah Panjang Beton x Panjang Bekisting 15.385 M2


Asumsi 3 Kali Pemakaian Bekisting 3.000 5.128 M2 5.128 M2

3 Sloof 30 x 40 Cm
Beton 0.300 0.400 0.120 M2
1 M3 Dibagi Dengan Jumlah 1.000 8.333 M1

Bekisting 0.400 0.400 0.800 M1

Jumlah Panjang Beton x Panjang Bekisting 6.667 M2


Asumsi 3 Kali Pemakaian Bekisting 3.000 2.222 M2 2.222 M2

4 Balok 30 x 50 Cm
Beton 0.300 0.500 0.150 M2
1 M3 Dibagi Dengan Jumlah 1.000 6.667 M1

Bekisting 0.300 0.380 0.380 1.060 M1

Jumlah Panjang Beton x Panjang Bekisting 7.067 M2


Asumsi 2 Kali Pemakaian Bekisting 2.000 3.533 M2 3.533 M2

5 Balok 30 x 40 Cm
Beton 0.300 0.400 0.120 M2
1 M3 Dibagi Dengan Jumlah 1.000 8.333 M1

Bekisting 0.300 0.280 0.280 0.860 M1

Jumlah Panjang Beton x Panjang Bekisting 7.167 M2


Asumsi 2 Kali Pemakaian Bekisting 2.000 3.583 M2 3.583 M2

6 Balok 20 x 40 Cm
Beton 0.200 0.400 0.080 M2
1 M3 Dibagi Dengan Jumlah 1.000 12.500 M1

Bekisting 0.200 0.280 0.280 0.760 M1

Jumlah Panjang Beton x Panjang Bekisting 9.500 M2


Asumsi 2 Kali Pemakaian Bekisting 2.000 4.750 M2 4.750 M2

7 Balok Latai 25 x 30 Cm
Beton 0.250 0.300 0.075 M2
1 M3 Dibagi Dengan Jumlah 1.000 13.333 M1

Bekisting 0.250 0.300 0.300 0.850 M1

Jumlah Panjang Beton x Panjang Bekisting 11.333 M2


VOLUME/KELILING JUMLAH
NO. URAIAN BANYAK JUMLAH
P (M) L (M) T (M) T' (M) DIBULATKAN
Asumsi 2 Kali Pemakaian Bekisting 2.000 5.667 M2 5.667 M2

8 Balok Latai 13 x 15 Cm
Beton 0.130 0.150 0.020 M2
1 M3 Dibagi Dengan Jumlah 1.000 51.282 M1

Bekisting 0.150 0.150 0.300 M1

Jumlah Panjang Beton x Panjang Bekisting 15.385 M2


Asumsi 3 Kali Pemakaian Bekisting 3.000 5.128 M2 5.128 M2

9 Ring Balok 13 x 15 Cm
Beton 0.130 0.150 0.020 M2
1 M3 Dibagi Dengan Jumlah 1.000 51.282 M1

Bekisting 0.150 0.150 0.300 M1

Jumlah Panjang Beton x Panjang Bekisting 15.385 M2


Asumsi 3 Kali Pemakaian Bekisting 3.000 5.128 M2 5.128 M2

10 Ring Balok 13 x 40 Cm
Beton 0.130 0.400 0.052 M2
1 M3 Dibagi Dengan Jumlah 1.000 19.231 M1

Bekisting 0.140 0.400 0.400 0.940 M1

Jumlah Panjang Beton x Panjang Bekisting 18.077 M2


Asumsi 3 Kali Pemakaian Bekisting 3.000 6.026 M2 6.026 M2

11 Plat Lantai T = 12 Cm
Beton 0.120 1.000 0.120 M2
1 M3 Dibagi Dengan Jumlah 1.000 8.333 M1

Bekisting 1.000 1.000 M1

Jumlah Panjang Beton x Panjang Bekisting 8.333 M2


Asumsi 2 Kali Pemakaian Bekisting 2.000 4.167 M2 4.167 M2

12 Plat Lantai Tangga T = 15 Cm


Beton 0.150 1.000 0.150 M2
1 M3 Dibagi Dengan Jumlah 1.000 6.667 M1

Bekisting 1.000 1.000 M1

Jumlah Panjang Beton x Panjang Bekisting 6.667 M2


Asumsi 2 Kali Pemakaian Bekisting 2.000 3.333 M2 3.333 M2

13 Kolom 30/40 Cm
Beton 0.300 0.400 0.120 M2
1 M3 Dibagi Dengan Jumlah 1.000 8.333 M1

Bekisting 0.300 0.400 0.300 0.400 1.400 M1

Jumlah Panjang Beton x Panjang Bekisting 11.667 M2


Asumsi 3 Kali Pemakaian Bekisting 3.000 3.889 M2 3.889 M2
VOLUME/KELILING JUMLAH
NO. URAIAN BANYAK JUMLAH
P (M) L (M) T (M) T' (M) DIBULATKAN
14 Kolom 30/30 Cm
Beton 0.300 0.300 0.090 M2
1 M3 Dibagi Dengan Jumlah 1.000 11.111 M1

Bekisting 0.300 0.300 0.300 0.300 1.200 M1

Jumlah Panjang Beton x Panjang Bekisting 13.333 M2


Asumsi 3 Kali Pemakaian Bekisting 3.000 4.444 M2 4.444 M2

15 Kolom 13 x 13 Cm
Beton 0.130 0.130 0.017 M2
1 M3 Dibagi Dengan Jumlah 1.000 59.172 M1

Bekisting 0.130 0.130 0.260 M1

Jumlah Panjang Beton x Panjang Bekisting 15.385 M2


Asumsi 3 Kali Pemakaian Bekisting 3.000 5.128 M2 5.128 M2

-
-
Banda Aceh, 25 April 2017
CV. MEGAH KARYA KOSNTRUKSI

-
-
PERHITUNGAN VOLUME

Pekerjaan : Pembangunan Perpustakaan dan Laboratorium SMPN 14 Banda Aceh


Lokasi : Komplek Budha Suchi - Kota Banda Aceh
### ###
###

Lebar Lebar Jumlah


No. Pekerjaan Panjang Lebar Tinggi Banyak Jumlah
Atas Bawah Dibulatkan

Div. A PEKERJAAN PERSIAPAN


1 Pengukuran dan Pemasangan Bouwplank 1.000 Paket 1.000 Paket

2 Biaya Administrasi pelaporan & Dokumentasi 1.000 Ls 1.000 Ls

3 Pembongkaran bangunan lama & Pembongkaran 2 btg pohon 1.000 Ls 1.000 Ls

4 Pengujian Mutu Beton 1.000 Ls 1.000 Ls

5 Pembuatan Papan Nama Proyek 1.000 Ls 1.000 Ls

### #NAME?
### PEKERJAAN TANAH DAN PASIR
### Galian Tanah Pondasi Tapak Type I 2.200 2.200 1.650 20.000 159.720 M3
Cicin sumuran (лr²) 0.785 0.950 3.140 0.500 20.000 14.915 M3
174.635 M3 174.635 M3

### Galian Tanah Pondasi Tapak Type II 1.700 1.700 1.650 16.000 76.296 M3
Cicin sumuran (лr²) 0.785 0.950 3.140 0.500 16.000 11.932 M3
2.000 1.700 1.650 1.000 5.610 M3
93.838 M3 93.838 M3

### Galian Tanah Pondasi Menerus 104.000 0.400 0.450 18.720 M3 18.720 M3

### Urugan Tanah 1/4 x Galian 71.798 M3 71.798 M3

### Urugan Pasir di bawah Pondasi 104.000 0.400 0.050 2.080 M3


2.200 2.200 0.050 20.000 4.840 M3
1.700 1.700 0.050 16.000 2.312 M3
2.000 1.700 0.050 1.000 0.170 M3
9.402 M3 9.402 M3

### Pondasi Batu Kali 1 : 4 104.000 0.250 0.400 0.200 0.300 10.400 M3 10.400 M3

### Cincin Sumur 2.000 20.000 40.000 M3


2.000 16.000 32.000 M3
72.000 M3 72.000 M3

### Beton Cor 1 : 2 : 3 Isian Sumuran 0.785 1.000 3.140 0.500 20.000 15.700 M3
0.785 1.000 3.140 0.500 16.000 12.560 M3
28.260 M3 28.260 M3

### Lantai Kerja di bawah Pondasi Tapak 2.200 2.200 0.100 20.000 9.680 M3
1.700 1.700 0.100 16.000 4.624 M3
2.000 1.700 0.100 1.000 0.340 M3
14.644 M3 14.644 M3

### PEKERJAAN BETON/BETON BERTULANG


### Beton Bertulang Pondasi Tapak 2.000 2.000 0.300 20.000 24.000 M3
1.500 1.500 0.300 16.000 10.800 M3
2.000 1.500 0.300 0.900 M3
35.700 M3 35.700 M3

### Beton Bertulang Kolom Pendestal 30/40 cm 0.400 0.300 1.450 20.000 3.480 M3
0.400 0.300 1.450 6.000 1.044 M3
4.524 M3 4.524 M3

### Beton Bertulang Kolom Pendestal 30/30 cm 0.300 0.300 1.450 10.000 1.305 M3 1.305 M3

### Beton Bertulang Sloof 30/40 cm 0.300 0.400 163.800 19.656 M3 19.656 M3

### Beton Bertulang Kolom Induk 30/40 cm 0.300 0.400 3.500 26.000 10.920 M3 10.920 M3

### Beton Bertulang Kolom Teras 30/30 cm 0.300 0.300 3.600 10.000 3.240 M3 3.240 M3

### Beton Bertulang Balok 30/50 cm 0.300 0.500 28.000 4.200 M3 4.200 M3

### Beton Bertulang Balok 30/40 cm 0.300 0.400 171.800 20.616 M3 20.616 M3

### Beton Bertulang Balok 20/40 cm 0.200 0.400 4.500 0.360 M3 0.360 M3

### Beton Bertulang Balok Latai 13/15 cm 0.130 0.150 70.000 1.365 M3 1.365 M3

### Beton Bertulang Ring Balok untuk selasar 13/15 cm 0.130 0.150 44.000 0.858 M3 0.858 M3

### Beton Bertulang Balok Ornamen Teras 30/40 cm 0.400 0.300 0.400 12.000 0.576 M3 0.576 M3

### Beton Bertulang Plat Lantai t = 12 cm 36.000 9.000 0.120 38.880 M3


4.000 4.000 0.120 1.920 M3
40.800 M3
Dikurangi balok Memajang 144.000 0.300 0.120 5.184 M3
Dikurangi balok Melintang 72.000 0.300 0.120 2.592 M3
7.776 M3
33.024 M3 33.024 M3
Lebar Lebar Jumlah
No. Pekerjaan Panjang Lebar Tinggi Banyak Jumlah
Atas Bawah Dibulatkan

### Beton Bertulang Plat Bordes dan Anak Tangga 6.700 2.000 0.150 2.010 M3
4.000 3.000 0.150 1.800 M3
3.810 M3 3.810 M3
LANTAI II
### Beton Bertulang Kolom Induk 30/40 cm 3.700 0.300 0.400 26.000 11.544 M3 11.544 M3

### Beton Bertulang Kolom Teras 30/30 cm 3.700 0.300 0.300 10.000 3.330 M3 3.330 M3

### Beton Bertulang Balok 25/30 cm 125.000 0.250 0.300 1.000 9.375 M3 9.375 M3

### Beton Bertulang Balok Latai 13/15 cm 72.800 0.130 0.150 1.000 1.420 M3 1.420 M3

### Beton Bertulang untuk selasar 13/15 cm (dudukan batu bata) 44.000 0.130 0.150 1.000 0.858 M3 0.858 M3

### #NAME?
LANTAI I
### Pasangan Trasram Bata 1 PC : 2 PS di bawah Lantai 95.300 0.400 38.120 M2
38.120 M2 38.120 M2

2 Plesteran Trasram Bata 1 PC : 2 PS di bawah Lantai 76.240 M2 76.240 M2

### Pasangan Dinding Bata 1 PC : 4 PS 104.400 3.350 349.740 M2


3.700 3.350 12.395 M2
362.135 M2 362.135
Dikurangi Jendela, Pintu
Pintu Type. P-1 Bagian Lantai bawah 2.600 1.300 4.000 13.520 M2
Jendela Type J-1 Bagian Lantai bawah 2.650 1.400 12.000 44.520 M2
Jendela Type J-12 Bagian Lantai bawah 2.000 1.400 4.000 11.200 M2
69.240 M2
Pas. Batu Bata Dikurangi Pintu, Jendela, kolom,dll 292.895 M2 292.895 M2

4 Plesteran Dinding Bata 1 PC : 4 PS 585.790 M1 585.790 M1

#NAME?
### Pasangan Dinding Bata 1 PC : 4 PS 104.400 3.550 370.620 M2
3.700 3.550 13.135 M2
370.620 M2
Dikurangi
Pas. Batu Kerawang Bagian Lantai atas 2.000 1.660 1.000 3.320 M2
Pintu Type. P-1 Bagian Lantai bawah 2.600 1.300 4.000 13.520 M2
Jendela Type J-1 Bagian Lantai bawah 2.650 1.400 12.000 44.520 M2
Jendela Type J-12 Bagian Lantai bawah 2.000 1.400 4.000 11.200 M2
72.560 M2
Pas. Batu Bata Dikurangi Pintu, Jendela, kolom,dll 298.060 M2 298.060 M2
-
### Plesteran Dinding Bata 1 PC : 4 PS 596.120 M2 596.120 M2

E. PEKERJAAN LANTAI
Pekerjaan Timbunan dan Urugan
1 Timbunan Tanah Bawah Lantai Ruangan 8.870 6.870 0.620 4.000 151.124 M3 151.124 M3
4.370 6.870 0.620 1.000 18.614 M3
169.737 M3

2 Timbunan Tanah di Bawah Selasar 40.000 1.370 0.570 31.236 M3


40.000 1.870 0.570 42.636 M3
10.370 1.370 0.570 2.000 16.196 M3
90.068 M3 90.068 M3

3 Urugan Pasir di Bawah Lantai Ruangan 8.870 6.870 0.100 4.000 24.375 M3 24.375 M3
4.370 6.870 0.100 1.000 3.002 M3
27.377 M3

4 Urugan Pasir di Bawah Lantai Selasar 40.000 1.370 0.100 5.480 M3


40.000 1.870 0.100 7.480 M3
10.370 1.370 0.100 2.000 2.841 M3
15.801 M3 15.801 M3
#NAME?
### Beton Tumbuk di Bawah Lantai Keramik t = 5 cm Ruangan 8.870 6.870 0.050 4.000 12.187 M3 13.688 M3
4.370 6.870 0.050 1.000 1.501 M3
13.688 M3

### Beton Tumbuk di Bawah Lantai Keramik t = 5 cm Selasar 40.000 1.370 0.050 2.740 M3
40.000 1.870 0.050 3.740 M3
10.370 1.370 0.050 2.000 1.421 M3
7.901 M3 7.901 M3

### Lantai Keramik 40 x 40 cm Ruangan 8.870 6.870 4.000 243.748 M2 273.770 M2


4.370 6.870 1.000 30.022 M2
273.770 M2

### Lantai Keramik 40 x 40 cm Anti Slip Pada Selasar 40.000 1.370 54.800 M2
40.000 1.870 74.800 M2
10.370 1.370 2.000 28.414 M2
158.014 M2 158.014 M2
Lebar Lebar Jumlah
No. Pekerjaan Panjang Lebar Tinggi Banyak Jumlah
Atas Bawah Dibulatkan
### #NAME? 2.000 0.200 20.000 8.000 M2
2.000 0.300 20.000 12.000 M2
2.000 4.000 1.000 8.000 M2
28.000 M2 28.000 M2

7 #NAME? 2.000 20.000 40.000 m' 40.000 m'

#NAME?
1 #NAME? 8.700 6.600 4.000 229.680 M3 M3
4.000 2.000 8.000

2 #NAME? 40.000 2.000 80.000 M2 M2


4.000 2.000 8.000 M2
88.000 M2

3 #NAME? 4.000 M2 M2

### #NAME?
#NAME?
### Kayu Kanopi Kuda-kuda Terpasang 10.000 Bh 10.000 Bh

2 Memasang Gording Kayu 120.000 0.050 0.050 0.300 M3 0.300 M3

3 Memasang Atap Genteng Metal 42.000 1.800 75.600 M2 75.600 M2

4 Kayu Listplank Uk. 3/20 cm 42.000 42.000 M' 42.000 M'

5 #NAME? 6.600 8.700 4.000 229.680 M2


39.700 1.870 74.239 M2
- M2
jumlah 303.919 M2 303.919 M2
M' - M'
6 #NAME? 6.600 8.700 4.000 229.680 M2
39.700 1.870 74.239 M2
- - - M2
jumlah 303.919 M2 303.919 M2

### #NAME? jumlah - 128.000 M2 128.000 M2

#NAME?
### Rangka Kuda-Kuda dan Gording Zincalume Type 100, 35.250 7.650 28.400 42.100 2.000 539.325
Penutup Atap dan Rabung Genteng Metal + Terpasang (SNI) 11.880 7.650 0.500 2.000 90.882
630.207 M2 630.207 M2

### Kayu Listplank Uk. 3/20 cm 107.960 107.960 M2 107.960 M2

### #NAME? 6.600 8.700 4.000 229.680 M2


depan 3.000 40.000 120.000 M2
tangga 4.000 8.700 34.800 M2
samping kiri dan kanan 12.000 1.000 2.000 24.000 M2
belakang 1.100 40.000 44.000 M2
Plafond Dikurangi 452.480 M2 M2

### #NAME? 452.480 M2 M2

### #NAME? 32.000 4.000 128.000 M' M'


90.000 90.000 M'
218.000 M'

G. PEKERJAAN PINTU, JENDELA DAN KUNCI


1 Pintu Type P1
a. Kosen Kayu 5/13 7.600 0.130 0.050 8.000 0.395 M³ 0.395 M³

b. Daun Pintu Panel Ukuran 60 x 210 cm x 2 2.100 1.200 16.000 40.320 M² 40.320 M²

c. Ventilasi Ambang Ukuran 40 x 60 cm 1.800 0.070 16.000 2.016 M² 2.016 M²

d. Kunci Tanam Bulat 8.000 Buah 8.000 Buah

e. Pegangan Pintu 8.000 Buah 8.000 Buah

f. Engsel Pintu 24.000 24.000 Psg 24.000 Psg

g. Engsel Ventilasi 16.000 16.000 Psg 16.000 Psg

h. Hak Angin Jendela / Ventilasi 32.000 32.000 Buah 32.000 Buah

i. Grendel Ventilasi 16.000 16.000 Buah 16.000 Buah

j. Tarikan Jendela 16.000 16.000 Buah 16.000 Buah

h. Kaca 5 mm 0.300 0.500 16.000 2.400 M2 2.400 M2


Lebar Lebar Jumlah
No. Pekerjaan Panjang Lebar Tinggi Banyak Jumlah
Atas Bawah Dibulatkan
### Jendela Ambang Kaca Type J1 (24 Unit)
### Kosen Kayu 5/13 14.950 0.130 0.050 24.000 2.332 ### 2.332 #NAME?

### Daun Jendela Ukuran 60 x 85 cm 2.700 0.130 0.050 96.000 1.685 ### 1.685 #NAME?

### Ventilasi Ambang Ukuran 40 x 60 cm 1.800 0.130 0.050 96.000 1.123 ### 1.123 #NAME?

### Engsel Jendela 96.000 ### 96.000 #NAME?

### Engsel Ventilasi 96.000 ### 96.000 #NAME?

### Grendel Jendela / Ventilasi 192.000 ### 192.000 #NAME?

### Hak Angin Jendela / Ventilasi 384.000 ### 384.000 #NAME?

### Tarikan Jendela 192.000 ### 192.000 #NAME?

### #REF! 0.300 0.500 96.000 14.400 M2


0.750 0.500 96.000 36.000
50.400 M2 50.400 M2

3 Jendela Ambang Kaca Type J2 (8 Unit)


a. Kosen Kayu 5/13 11.600 0.130 0.050 8.000 0.603 M³ 0.603 M³

b. Daun Jendela Ukuran 85 x 90 cm 2.700 0.130 0.050 24.000 0.421 M2 0.421 M2

c. Ventilasi Ambang Ukuran 40 x 60 cm 1.800 0.130 0.050 24.000 0.281 M2 0.281 M2

d. Engsel Jendela 24.000 Psg 24.000 Psg

e. Engsel Ventilasi 24.000 Psg 24.000 Psg

f. Grendel Jendela / Ventilasi 48.000 Buah 48.000 Buah

g. Hak Angin Jendela / Ventilasi 96.000 Buah 96.000 Buah

h. Tarikan Jendela 48.000 Buah 48.000 Buah

i. Kaca 5 mm 0.300 0.500 24.000 3.600


0.750 0.500 24.000 9.000
12.600 M2 12.600 M2
### #NAME?
### Armatur
- Lampu HE 18 Watt Setara Hannoch 72.000 72.000
### Stop Kontak 18.000 18.000
### Instalasi titik penerangan, instalasi termasuk kabel 72.000 72.000
NYA 3 x 2.5 mm dalam pipa PVC fitting lampu dan
kelengkapan instalasi terpasang
### Instalasi titik kontak, instalasi termasuk kabel 18.000 18.000
NYA 3 x 2.5 mm dalam pipa PVC, kotak stop kontak
BROCO dan kelengkapan instalasi terpasang
### #NAME?
#NAME? 1.000 1.000
#NAME? 4.000 4.000

### #NAME?
### #NAME? 40.200 630.000 655.860 1,326.060 M2 1,326.060 M2

### Cat palfond 756.399 756.399 M2 756.399 M2

### Cat Lis Plafond 218.000 0.210 45.780 M2 45.780 M2

### Cat Mengkilat Kosen, Daun Pintu, Jendela dan Jelusi


Kosen P1 1.727 8.000 13.816 M2
P2 2.100 1.200 2.000 8.000 33.600 M2
J1 3.292 8.000 26.336 M2
J2 4.329 2.000 8.658 M2
- 82.410 M2 82.410 M2

-
-
Banda Aceh, 25 April 2017
CV. MEGAH KARYA KOSNTRUKSI

-
-
DAFTAR ANALISA HARGA SATUAN

I. PEKERJAAN TANAH
SNI 2835-2008-6.1
1 M3 Galian Tanah Keras Sedalam 1 Meter
0.7500 OH Pekerja @Rp 70,000.00 Rp. 52,500.00
0.0250 OH Mandor @Rp 90,000.00 Rp. 2,250.00
Jumlah Rp. 54,750.00
Dibulatkan Rp. 54,750.00

SNI 2835-2008-6.2
1 m³ Galian Tanah Biasa Sedalam 2 Meter
0.900 OH Pekerja @Rp 70,000.00 Rp. 63,000.00
0.045 OH Mandor @Rp 90,000.00 Rp. 4,050.00
Jumlah Rp. 67,050.00
Dibulatkan Rp. 67,050.00

SNI 2835-2008-6.9
1 M3 Urugan Tanah Kembali
0.2500 OH Pekerja @Rp 70,000.00 Rp. 17,500.00
0.0080 OH Mandor @Rp 90,000.00 Rp. 720.00
Jumlah Rp. 18,220.00
Dibulatkan Rp. 18,220.00

SNI 2835-2008-6.11
1 M3 Mengurug Pasir Urug
1.2000 M3 Pasir Urug @Rp 116.67 Rp. 140.00
0.3000 OH Pekerja @Rp 70,000.00 Rp. 21,000.00
0.0100 OH Mandor @Rp 90,000.00 Rp. 900.00
Jumlah Rp. 22,040.00
Dibulatkan Rp. 22,040.00

SNI 2835-2008-6.11.a
1 M3 Mengurug Tanah Timbun
1.2000 M3 Tanah Timbun @Rp 50,000.00 Rp. 60,000.00
0.3000 OH Pekerja @Rp 70,000.00 Rp. 21,000.00
0.0100 OH Mandor @Rp 90,000.00 Rp. 900.00
Jumlah Rp. 81,900.00
Dibulatkan Rp. 81,900.00

II. PEKERJAAN PONDASI


SNI 2836-2008-6.2
1 M3 Pasangan Batu Belah 1 PC : 4 PS
1.2000 M3 Batu Belah 15/20 cm @Rp 110,000.00 Rp. 132,000.00
0.5200 M3 Pasir Beton @Rp 15,000.00 Rp. 7,800.00
163.0000 Kg Semen Portland @Rp 71,000.00 Rp. 11,573,000.00
1.5000 OH Pekerja @Rp 70,000.00 Rp. 105,000.00
0.7500 OH Tukang @Rp 90,000.00 Rp. 67,500.00
0.0750 OH Kepala Tukang @Rp 100,000.00 Rp. 7,500.00
0.0750 OH Mandor @Rp 90,000.00 Rp. 6,750.00
Jumlah Rp. 11,899,550.00
Dibulatkan Rp. 11,899,550.00
SNI 2836-2008-6.9
1 M3 Pasangan Batu Kosong (Aanstamping)
1.2000 M3 Batu Belah 15/20 cm @Rp 110,000.00 Rp. 132,000.00
0.4320 M3 Pasir Urug @Rp 116.67 Rp. 50.40
0.7800 OH Pekerja @Rp 70,000.00 Rp. 54,600.00
0.3900 OH Tukang @Rp 90,000.00 Rp. 35,100.00
0.0390 OH Kepala Tukang @Rp 100,000.00 Rp. 3,900.00
0.0390 OH Mandor @Rp 90,000.00 Rp. 3,510.00
Jumlah Rp. 229,160.40
Dibulatkan Rp. 229,160.40

III. PEKERJAAN BETON


SNI 7394-2008-6.1
1 M3 Beton Mutu f'c = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c = 0,87
869.0000 Kg Pasir Beton @Rp 14,000.00 Rp. 12,166,000.00
999.0000 Kg Kerikil Beton @Rp 5,220.00 Rp. 5,214,780.00
247.0000 Kg Semen Portland @Rp 71,000.00 Rp. 17,537,000.00
215.0000 Liter Air @Rp 500.00 Rp. 107,500.00
1.6500 OH Pekerja @Rp 70,000.00 Rp. 115,500.00
0.2750 OH Tukang @Rp 90,000.00 Rp. 24,750.00
0.0280 OH Kepala Tukang @Rp 100,000.00 Rp. 2,800.00
0.0830 OH Mandor @Rp 90,000.00 Rp. 7,470.00
Jumlah Rp. 35,175,800.00
Dibulatkan Rp. 35,175,800.00

SNI 7394-2008-6.4
1 M3 Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K100), slump (3-6) cm, w/c = 0,87
893.0000 Kg Pasir Beton @Rp 14,000.00 Rp. 12,502,000.00
1,027.0000 Kg Kerikil Beton @Rp 5,220.00 Rp. 5,360,940.00
230.0000 Kg Semen Portland @Rp 71,000.00 Rp. 16,330,000.00
200.0000 Liter Air @Rp 500.00 Rp. 100,000.00
1.2000 OH Pekerja @Rp 70,000.00 Rp. 84,000.00
0.2000 OH Tukang @Rp 90,000.00 Rp. 18,000.00
0.0200 OH Kepala Tukang @Rp 100,000.00 Rp. 2,000.00
0.0600 OH Mandor @Rp 90,000.00 Rp. 5,400.00
Jumlah Rp. 34,402,340.00
Dibulatkan Rp. 34,402,340.00

SNI 7394-2008-6.5
1 M3 Beton Mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,66
760.0000 Kg Pasir Beton @Rp 14,000.00 Rp. 10,640,000.00
1,029.0000 Kg Kerikil Beton (Maximum 30 mm) @Rp 5,220.00 Rp. 5,371,380.00
326.0000 Kg Semen Portland @Rp 71,000.00 Rp. 23,146,000.00
215.0000 Liter Air @Rp 500.00 Rp. 107,500.00
1.6500 OH Pekerja @Rp 70,000.00 Rp. 115,500.00
0.2750 OH Tukang @Rp 90,000.00 Rp. 24,750.00
0.0280 OH Kepala Tukang @Rp 100,000.00 Rp. 2,800.00
0.0830 OH Mandor @Rp 90,000.00 Rp. 7,470.00
Jumlah Rp. 39,415,400.00
Dibulatkan Rp. 39,415,400.00
SNI 7394-2008-6.7
1 M3 Beton Mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c = 0,58
698.0000 Kg Pasir Beton @Rp 14,000.00 Rp. 9,772,000.00
1,047.0000 Kg Kerikil Beton (Maximum 30 mm) @Rp 5,220.00 Rp. 5,465,340.00
371.0000 Kg Semen Portland @Rp 71,000.00 Rp. 26,341,000.00
215.0000 Liter Air @Rp 500.00 Rp. 107,500.00
1.6500 OH Pekerja @Rp 70,000.00 Rp. 115,500.00
0.2750 OH Tukang @Rp 90,000.00 Rp. 24,750.00
0.0280 OH Kepala Tukang @Rp 100,000.00 Rp. 2,800.00
0.0830 OH Mandor @Rp 90,000.00 Rp. 7,470.00
Jumlah Rp. 41,836,360.00
Dibulatkan Rp. 41,836,360.00

SNI 7394-2008-6.8
1 M3 Beton Mutu F'C = 21,7 MPa (K250), Slump (12 ± 2) cm, w/c = 0,56
692.0000 Kg Pasir Beton @Rp 14,000.00 Rp. 9,688,000.00
1039.0000 Kg Kerikil Beton (Maximum 30 mm) @Rp 5,220.00 Rp. 5,423,580.00
384.0000 Kg Semen Portland @Rp 71,000.00 Rp. 27,264,000.00
215.0000 Liter Air @Rp 500.00 Rp. 107,500.00
1.6500 OH Pekerja @Rp 70,000.00 Rp. 115,500.00
0.2750 OH Tukang @Rp 90,000.00 Rp. 24,750.00
0.0280 OH Kepala Tukang @Rp 100,000.00 Rp. 2,800.00
0.0830 OH Mandor @Rp 90,000.00 Rp. 7,470.00
Jumlah Rp. 42,633,600.00
Dibulatkan Rp. 42,633,600.00
SNI 7394-2008-6.9
1 M3 Beton Mutu f'c = 24 Mpa (K275), slump (12 ± 2) cm, w/c = 0,53
684.0000 Kg Pasir Beton @Rp 14,000.00 Rp. 9,576,000.00
1,026.0000 Kg Kerikil Beton (Maximum 30 mm) @Rp 5,220.00 Rp. 5,355,720.00
406.0000 Kg Semen Portland @Rp 71,000.00 Rp. 28,826,000.00
215.0000 Liter Air @Rp 500.00 Rp. 107,500.00
1.6500 OH Pekerja @Rp 70,000.00 Rp. 115,500.00
0.2750 OH Tukang @Rp 90,000.00 Rp. 24,750.00
0.0280 OH Kepala Tukang @Rp 100,000.00 Rp. 2,800.00
0.0830 OH Mandor @Rp 90,000.00 Rp. 7,470.00
Jumlah Rp. 44,015,740.00
Dibulatkan Rp. 44,015,740.00

SNI 7394-2008-6.17
1 Kg Besi Polos
1.0500 Kg Besi Beton Polos @Rp 13,000.00 Rp. 13,650.00
0.0150 Kg Kawat Beton @Rp 15,000.00 Rp. 225.00
0.0070 OH Pekerja @Rp 70,000.00 Rp. 490.00
0.0070 OH Tukang @Rp 90,000.00 Rp. 630.00
0.0007 OH Kepala Tukang @Rp 100,000.00 Rp. 70.00
0.0004 OH Mandor @Rp 90,000.00 Rp. 36.00
Jumlah Rp. 15,101.00
Dibulatkan Rp. 15,101.00

SNI 7394-2008-6.17.a
1 Kg Besi Ulir
1.0500 Kg Besi Ulir @Rp 14,000.00 Rp. 14,700.00
0.0150 Kg Kawat Beton @Rp 15,000.00 Rp. 225.00
0.0070 OH Pekerja @Rp 70,000.00 Rp. 490.00
0.0070 OH Tukang @Rp 90,000.00 Rp. 630.00
0.0007 OH Kepala Tukang @Rp 100,000.00 Rp. 70.00
0.0004 OH Mandor @Rp 90,000.00 Rp. 36.00
Jumlah Rp. 16,151.00
Dibulatkan Rp. 16,151.00
SNI 7394-2008-6.20
1 M2 Bekisting Untuk Pondasi
0.0400 M3 Kayu Kelas III @Rp 2,500,000.00 Rp. 100,000.00
0.3000 Kg Paku Biasa @Rp 19,000.00 Rp. 5,700.00
0.1000 Liter Minyak Bekisting @Rp 49,450.00 Rp. 4,945.00
0.5200 OH Pekerja @Rp 70,000.00 Rp. 36,400.00
0.2600 OH Tukang @Rp 90,000.00 Rp. 23,400.00
0.0260 OH Kepala Tukang @Rp 100,000.00 Rp. 2,600.00
0.0260 OH Mandor @Rp 90,000.00 Rp. 2,340.00
Jumlah Rp. 175,385.00
Dibulatkan Rp. 175,385.00

SNI 7394-2008-6.21
1 M2 Bekisting Untuk Sloof
0.0450 M3 Kayu Kelas III @Rp 2,500,000.00 Rp. 112,500.00
0.3000 Kg Paku Biasa @Rp 19,000.00 Rp. 5,700.00
0.1000 Liter Minyak Bekisting @Rp 49,450.00 Rp. 4,945.00
0.5200 OH Pekerja @Rp 70,000.00 Rp. 36,400.00
0.2600 OH Tukang @Rp 90,000.00 Rp. 23,400.00
0.0260 OH Kepala Tukang @Rp 100,000.00 Rp. 2,600.00
0.0260 OH Mandor @Rp 90,000.00 Rp. 2,340.00
Jumlah Rp. 187,885.00
Dibulatkan Rp. 187,885.00

SNI 7394-2008-6.22
1 M2 Bekisting Untuk Kolom
0.0400 M3 Kayu Kelas III @Rp 2,500,000.00 Rp. 100,000.00
0.4000 Kg Paku Biasa @Rp 19,000.00 Rp. 7,600.00
0.2000 Liter Minyak Bekisting @Rp 49,450.00 Rp. 9,890.00
0.0150 M3 Balok Kayu Kelas III @Rp 2,500,000.00 Rp. 37,500.00
0.3500 Lembar Plywood Tebal 9 mm @Rp 100,000.00 Rp. 35,000.00
2.0000 Batang Dolken Kayu Ø 8 - 10, 4 M @Rp 7,560.00 Rp. 15,120.00
0.6600 OH Pekerja @Rp 70,000.00 Rp. 46,200.00
0.3300 OH Tukang @Rp 90,000.00 Rp. 29,700.00
0.0330 OH Kepala Tukang @Rp 100,000.00 Rp. 3,300.00
0.0330 OH Mandor @Rp 90,000.00 Rp. 2,970.00
Jumlah Rp. 287,280.00
Dibulatkan Rp. 287,280.00

SNI 7394-2008-6.23
1 M2 Bekisting Untuk Balok
0.0400 M3 Kayu Kelas III @Rp 2,500,000.00 Rp. 100,000.00
0.4000 Kg Paku Biasa @Rp 19,000.00 Rp. 7,600.00
0.2000 Liter Minyak Bekisting @Rp 49,450.00 Rp. 9,890.00
0.0180 M3 Balok Kayu Kelas III @Rp 2,500,000.00 Rp. 45,000.00
0.3500 Lembar Plywood Tebal 9 mm @Rp 100,000.00 Rp. 35,000.00
2.0000 Batang Dolken Kayu Ø 8 - 10, 4 M @Rp 7,560.00 Rp. 15,120.00
0.6600 OH Pekerja @Rp 70,000.00 Rp. 46,200.00
0.3300 OH Tukang @Rp 90,000.00 Rp. 29,700.00
0.0330 OH Kepala Tukang @Rp 100,000.00 Rp. 3,300.00
0.0330 OH Mandor @Rp 90,000.00 Rp. 2,970.00
Jumlah Rp. 294,780.00
Dibulatk Rp. 294,780.00
SNI 7394-2008-6.24
1 M2 Bekisting Untuk Plat Lantai
0.0400 M3 Kayu Kelas III @Rp 2,500,000.00 Rp. 100,000.00
0.4000 Kg Paku Biasa @Rp 19,000.00 Rp. 7,600.00
0.2000 Liter Minyak Bekisting @Rp 49,450.00 Rp. 9,890.00
0.0150 M3 Balok Kayu Kelas III @Rp 2,500,000.00 Rp. 37,500.00
0.3500 Lembar Plywood Tebal 9 mm @Rp 100,000.00 Rp. 35,000.00
6.0000 Batang Dolken Kayu Ø 8 - 10, 4 M @Rp 7,560.00 Rp. 45,360.00
0.6600 OH Pekerja @Rp 70,000.00 Rp. 46,200.00
0.3300 OH Tukang @Rp 90,000.00 Rp. 29,700.00
0.0330 OH Kepala Tukang @Rp 100,000.00 Rp. 3,300.00
0.0330 OH Mandor @Rp 90,000.00 Rp. 2,970.00
Jumlah Rp. 317,520.00
Dibulatkan Rp. 317,520.00

SNI 7394-2008-6.26
1 M2 Bekisting Untuk Tangga
0.0300 M3 Kayu Kelas III @Rp 2,500,000.00 Rp. 75,000.00
0.4000 Kg Paku Biasa @Rp 19,000.00 Rp. 7,600.00
0.1500 Liter Minyak Bekisting @Rp 49,450.00 Rp. 7,417.50
0.0150 M3 Balok Kayu Kelas III @Rp 2,500,000.00 Rp. 37,500.00
0.3500 Lembar Plywood Tebal 9 mm @Rp 100,000.00 Rp. 35,000.00
2.0000 Batang Dolken Kayu Ø 8 - 10, 4 M @Rp 7,560.00 Rp. 15,120.00
0.6600 OH Pekerja @Rp 70,000.00 Rp. 46,200.00
0.3300 OH Tukang @Rp 90,000.00 Rp. 29,700.00
0.0330 OH Kepala Tukang @Rp 100,000.00 Rp. 3,300.00
0.0330 OH Mandor @Rp 90,000.00 Rp. 2,970.00
Jumlah Rp. 259,807.50
Dibulatkan Rp. 259,807.50

Pekerjaan Lain-lain
Membongkar dan Menyiram Beton
1.0000 OH Pekerja @Rp 70,000.00 Rp. 70,000.00
Jumlah Rp. 70,000.00

REKAPITULASI PEKERJAAN BETON


Suplemen 1
1 M3 Pondasi Tapak Beton Bertulang
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,633,600.00 Rp. 42,633,600.00
105.2160 Kg SNI 7394-2008-6.17 @Rp 15,101.00 Rp. 1,588,866.82
5.0000 M2 SNI 7394-2008-6.20 @Rp 175,385.00 Rp. 876,925.00
1.0000 Ls Pekerjaan Lain-lain @Rp 70,000.00 Rp. 70,000.00
Jumlah Rp. 45,169,391.82
Dibulatkan Rp. 45,169,391.82

Suplemen 2
1 M3 Sloof Beton Bertulang Ukuran 30 x 40 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,633,600.00 Rp. 42,633,600.00
190.0464 Kg SNI 7394-2008-6.17 @Rp 15,101.00 Rp. 2,869,890.69
2.2222 M2 SNI 7394-2008-6.21 @Rp 187,885.00 Rp. 417,522.22
1.0000 Ls Pekerjaan Lain-lain @Rp 70,000.00 Rp. 70,000.00
Jumlah Rp. 45,991,012.91
Dibulatkan Rp. 45,991,012.91
Suplemen 3
1 M3 Balok Beton Bertulang Ukuran 30 x 50 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,633,600.00 Rp. 42,633,600.00
176.7957 Kg SNI 7394-2008-6.17 @Rp 15,101.00 Rp. 2,669,792.37
3.5333 M2 SNI 7394-2008-6.23 @Rp 294,780.00 Rp. 1,041,556.00
1.0000 Ls Pekerjaan Lain-lain @Rp 70,000.00 Rp. 70,000.00
Jumlah Rp. 46,414,948.37
Dibulatkan Rp. 46,414,948.37

Suplemen 4
1 M3 Balok Beton Bertulang Ukuran 30 x 40 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,633,600.00 Rp. 42,633,600.00
183.9173 Kg SNI 7394-2008-6.17 @Rp 15,101.00 Rp. 2,777,335.65
3.5833 M2 SNI 7394-2008-6.23 @Rp 294,780.00 Rp. 1,056,295.00
1.0000 Ls Pekerjaan Lain-lain @Rp 70,000.00 Rp. 70,000.00
Jumlah Rp. 46,537,230.65
Dibulatkan Rp. 46,537,230.65

Suplemen 5
1 M3 Balok Beton Bertulang Ukuran 20 x 40 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,633,600.00 Rp. 42,633,600.00
170.3235 Kg SNI 7394-2008-6.17 @Rp 15,101.00 Rp. 2,572,055.17
4.7500 M2 SNI 7394-2008-6.23 @Rp 294,780.00 Rp. 1,400,205.00
1.0000 Ls Pekerjaan Lain-lain @Rp 70,000.00 Rp. 70,000.00
Jumlah Rp. 46,675,860.17
Dibulatkan Rp. 46,675,860.17

Suplemen 6
1 M3 Balok Beton Bertulang Ukuran 25 x 30 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,633,600.00 Rp. 42,633,600.00
133.5339 Kg SNI 7394-2008-6.17 @Rp 15,101.00 Rp. 2,016,494.92
5.6667 M2 SNI 7394-2008-6.23 @Rp 294,780.00 Rp. 1,670,420.00
1.0000 Ls Pekerjaan Lain-lain @Rp 70,000.00 Rp. 70,000.00
Jumlah Rp. 46,390,514.92
Dibulatkan Rp. 46,390,514.92

Suplemen 7
1 M3 Balok Latai Beton Bertulang Ukuran 13 x 15 Cm
1.0000 M3 SNI 7394-2008-6.7 @Rp 41,836,360.00 Rp. 41,836,360.00
247.3795 Kg SNI 7394-2008-6.17 @Rp 15,101.00 Rp. 3,735,677.64
5.1282 M2 SNI 7394-2008-6.23 @Rp 294,780.00 Rp. 1,511,692.31
1.0000 Ls Pekerjaan Lain-lain @Rp 70,000.00 Rp. 70,000.00
Jumlah Rp. 47,153,729.94
Dibulatkan Rp. 47,153,729.94

Suplemen 8
1 M3 Ring Balok Beton Bertulang Ukuran 13 x 15 Cm
1.0000 M3 SNI 7394-2008-6.7 @Rp 41,836,360.00 Rp. 41,836,360.00
247.3795 Kg SNI 7394-2008-6.17 @Rp 15,101.00 Rp. 3,735,677.64
5.1282 M2 SNI 7394-2008-6.23 @Rp 294,780.00 Rp. 1,511,692.31
1.0000 Ls Pekerjaan Lain-lain @Rp 70,000.00 Rp. 70,000.00
Jumlah Rp. 47,153,729.94
Dibulatkan Rp. 47,153,729.94

Suplemen 9
1 M3 Balok Ornamen Beton Bertulang Ukuran 30 x 40 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,633,600.00 Rp. 42,633,600.00
163.7783 Kg SNI 7394-2008-6.17 @Rp 15,101.00 Rp. 2,473,216.61
6.0256 M2 SNI 7394-2008-6.23 @Rp 294,780.00 Rp. 1,776,238.46
1.0000 Ls Pekerjaan Lain-lain @Rp 70,000.00 Rp. 70,000.00
Jumlah Rp. 46,953,055.07
Dibulatkan Rp. 46,953,055.07
Suplemen 10
1 M3 Lantai Beton Bertulang Ukuran T = 12 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,633,600.00 Rp. 42,633,600.00
123.3000 Kg SNI 7394-2008-6.17 @Rp 15,101.00 Rp. 1,861,953.30
4.1667 M2 SNI 7394-2008-6.24 @Rp 317,520.00 Rp. 1,323,000.00
1.0000 Ls Pekerjaan Lain-lain @Rp 70,000.00 Rp. 70,000.00
Jumlah Rp. 45,888,553.30
Dibulatkan Rp. 45,888,553.30

Suplemen 11
1 M3 Plat Bordes dan Anak Tangga Beton Bertulang Ukuran T = 15 cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,633,600.00 Rp. 42,633,600.00
142.0416 Kg SNI 7394-2008-6.17 @Rp 15,101.00 Rp. 2,144,970.20
3.3333 M2 SNI 7394-2008-6.26 @Rp 259,807.50 Rp. 866,025.00
1.0000 Ls Pekerjaan Lain-lain @Rp 70,000.00 Rp. 70,000.00
Jumlah Rp. 45,714,595.20
Dibulatkan Rp. 45,714,595.20

Suplemen 12
1 M3 Kolom Beton Bertulang Ukuran 30 x 40 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,633,600.00 Rp. 42,633,600.00
163.7783 Kg SNI 7394-2008-6.17 @Rp 15,101.00 Rp. 2,473,216.61
1.9444 M2 SNI 7394-2008-6.22 @Rp 287,280.00 Rp. 558,600.00
1.0000 Ls Pekerjaan Lain-lain @Rp 70,000.00 Rp. 70,000.00
Jumlah Rp. 45,735,416.61
Dibulatkan Rp. 45,735,416.61

Suplemen 13
1 M3 Kolom Beton Bertulang Ukuran 30 x 30 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,633,600.00 Rp. 42,633,600.00
177.1547 Kg SNI 7394-2008-6.17 @Rp 15,101.00 Rp. 2,675,212.62
2.2222 M2 SNI 7394-2008-6.22 @Rp 287,280.00 Rp. 638,400.00
1.0000 Ls Pekerjaan Lain-lain @Rp 70,000.00 Rp. 70,000.00
Jumlah Rp. 46,017,212.62
Dibulatkan Rp. 46,017,212.62

Suplemen 14
1 M3 Kolom Beton Bertulang Ukuran 30 x 40 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,633,600.00 Rp. 42,633,600.00
137.4743 Kg SNI 7394-2008-6.17 @Rp 15,101.00 Rp. 2,075,999.91
1.9444 M2 SNI 7394-2008-6.22 @Rp 287,280.00 Rp. 558,600.00
1.0000 Ls Pekerjaan Lain-lain @Rp 70,000.00 Rp. 70,000.00
Jumlah Rp. 45,338,199.91
Dibulatkan Rp. 45,338,199.91

Suplemen 15
1 M3 Kolom Beton Bertulang Ukuran 30 x 30 Cm
1.0000 M3 SNI 7394-2008-6.8 @Rp 42,633,600.00 Rp. 42,633,600.00
183.2991 Kg SNI 7394-2008-6.17 @Rp 15,101.00 Rp. 2,767,999.88
2.2222 M2 SNI 7394-2008-6.22 @Rp 287,280.00 Rp. 638,400.00
1.0000 Ls Pekerjaan Lain-lain @Rp 70,000.00 Rp. 70,000.00
Jumlah Rp. 46,109,999.88
Dibulatkan Rp. 46,109,999.88

Suplemen 16
1 M3 Kolom Beton Bertulang Ukuran 13 x 13 Cm
1.0000 M3 SNI 7394-2008-6.7 @Rp 41,836,360.00 Rp. 41,836,360.00
163.7783 Kg SNI 7394-2008-6.17 @Rp 15,101.00 Rp. 2,473,216.61
2.5641 M2 SNI 7394-2008-6.22 @Rp 287,280.00 Rp. 736,615.38
1.0000 Ls Pekerjaan Lain-lain @Rp 70,000.00 Rp. 70,000.00
Jumlah Rp. 45,116,192.00
Dibulatkan Rp. 45,116,192.00
IV. PEKERJAAN DINDING
SNI 6897-2008-6.7
1 M2 Pasangan Bata Merah Tebal 1/2 Bata Adukan 1PC : 2 PP
0.0380 M3 Pasir Pasang @Rp 500.00 Rp. 19.00
70.0000 Buah Batu Bata @Rp 690.00 Rp. 48,300.00
18.9500 Kg Semen Portland @Rp 71,000.00 Rp. 1,345,450.00
0.3000 OH Pekerja @Rp 70,000.00 Rp. 21,000.00
0.1000 OH Tukang @Rp 90,000.00 Rp. 9,000.00
0.0100 OH Kepala Tukang @Rp 100,000.00 Rp. 1,000.00
0.0150 OH Mandor @Rp 90,000.00 Rp. 1,350.00
Jumlah Rp. 1,426,119.00
Dibulatkan Rp. 1,426,119.00

SNI 6897-2008-6.9
1 M2 Pasangan Bata Merah Tebal 1/2 Bata Adukan 1PC : 4 PP
0.0430 M3 Pasir Pasang @Rp 500.00 Rp. 21.50
70.0000 Buah Batu Bata @Rp 690.00 Rp. 48,300.00
11.5000 Kg Semen Portland @Rp 71,000.00 Rp. 816,500.00
0.3000 OH Pekerja @Rp 70,000.00 Rp. 21,000.00
0.1000 OH Tukang @Rp 90,000.00 Rp. 9,000.00
0.0100 OH Kepala Tukang @Rp 100,000.00 Rp. 1,000.00
0.0150 OH Mandor @Rp 90,000.00 Rp. 1,350.00
Jumlah Rp. 897,171.50
Dibulatkan Rp. 897,171.00

V. PEKERJAAN PLESTERAN
SNI 2837-2008-6.2
1 M2 Plesteran 1 PC : 2 PP : Tebal 15 mm
0.0200 M3 Pasir Beton @Rp 15,000.00 Rp. 300.00
10.2240 Kg Semen Portland @Rp 71,000.00 Rp. 725,904.00
0.3000 OH Pekerja @Rp 70,000.00 Rp. 21,000.00
0.1500 OH Tukang @Rp 90,000.00 Rp. 13,500.00
0.0150 OH Kepala Tukang @Rp 100,000.00 Rp. 1,500.00
0.0150 OH Mandor @Rp 90,000.00 Rp. 1,350.00
Jumlah Rp. 763,554.00
Dibulatkan Rp. 763,554.00

SNI 2837-2008-6.3
1 M2 Plesteran 1 PC : 3 PP : Tebal 15 mm
0.0230 M3 Pasir Beton @Rp 15,000.00 Rp. 345.00
7.7760 Kg Semen Portland @Rp 71,000.00 Rp. 552,096.00
0.3000 OH Pekerja @Rp 70,000.00 Rp. 21,000.00
0.1500 OH Tukang @Rp 90,000.00 Rp. 13,500.00
0.0150 OH Kepala Tukang @Rp 100,000.00 Rp. 1,500.00
0.0150 OH Mandor @Rp 90,000.00 Rp. 1,350.00
Jumlah Rp. 589,791.00
Dibulatkan Rp. 589,791.00

SNI 2837-2008-6.4
1 M2 Plesteran 1 PC : 4 PP : Tebal 15 mm
0.0240 M3 Pasir Beton @Rp 15,000.00 Rp. 360.00
6.2400 Kg Semen Portland @Rp 71,000.00 Rp. 443,040.00
0.3000 OH Pekerja @Rp 70,000.00 Rp. 21,000.00
0.1500 OH Tukang @Rp 90,000.00 Rp. 13,500.00
0.0150 OH Kepala Tukang @Rp 100,000.00 Rp. 1,500.00
0.0150 OH Mandor @Rp 90,000.00 Rp. 1,350.00
Jumlah Rp. 480,750.00
Dibulatkan Rp. 480,750.00
SNI 2837-2008-6.27
1 M2 Acian
3.2500 Kg Semen Portland @Rp 71,000.00 Rp. 230,750.00
0.2000 OH Pekerja @Rp 70,000.00 Rp. 14,000.00
0.1000 OH Tukang @Rp 90,000.00 Rp. 9,000.00
0.0100 OH Kepala Tukang @Rp 100,000.00 Rp. 1,000.00
0.0100 OH Mandor @Rp 90,000.00 Rp. 900.00
Jumlah Rp. 255,650.00
Dibulatkan Rp. 255,650.00

VI. PEKERJAAN KAYU


SNI 3434-2008-6.1
Membuat dan Memasang 1 M3 Kusen Pintu dan Jendela Kayu Kelas I
1.1000 M3 Balok Kayu Kelas I @Rp 5,000,000.00 Rp. 5,500,000.00
1.0000 Kg Lem Kayu @Rp 123.08 Rp. 123.08
1.2500 Kg Paku Biasa @Rp 19,000.00 Rp. 23,750.00
7.0000 OH Pekerja @Rp 70,000.00 Rp. 490,000.00
21.0000 OH Tukang @Rp 90,000.00 Rp. 1,890,000.00
2.1000 OH Kepala Tukang @Rp 100,000.00 Rp. 210,000.00
0.3500 OH Mandor @Rp 90,000.00 Rp. 31,500.00
Jumlah Rp. 8,145,373.08
Dibulatkan Rp. 8,145,373.08

SNI 3434-2008-6.5
Membuat dan Memasang 1 M2 Daun Pintu Panel Kayu Kelas I
0.0400 M3 Papan Kayu Kelas I @Rp 5,000,000.00 Rp. 200,000.00
0.5000 Kg Lem Kayu @Rp 123.08 Rp. 61.54
1.0000 OH Pekerja @Rp 70,000.00 Rp. 70,000.00
3.0000 OH Tukang @Rp 90,000.00 Rp. 270,000.00
0.3000 OH Kepala Tukang @Rp 100,000.00 Rp. 30,000.00
0.0500 OH Mandor @Rp 90,000.00 Rp. 4,500.00
Jumlah Rp. 574,561.54
Dibulatkan Rp. 574,561.54

SNI 3434-2008-6.6
Membuat dan memasang 1 M2 Pintu dan Jendela Kaca Kayu Kelas I
0.0240 M3 Papan Kayu Kelas I @Rp 5,000,000.00 Rp. 120,000.00
0.3000 Kg Paku Biasa @Rp 19,000.00 Rp. 5,700.00
0.8000 OH Pekerja @Rp 70,000.00 Rp. 56,000.00
2.4000 OH Tukang @Rp 90,000.00 Rp. 216,000.00
0.2400 OH Kepala Tukang @Rp 100,000.00 Rp. 24,000.00
0.0400 OH Mandor @Rp 90,000.00 Rp. 3,600.00
Jumlah Rp. 425,300.00
Dibulatkan Rp. 425,300.00

SNI 3434-2008-6.10
Memasang 1 M2 Jalusi Kusen Kayu Kelas I
0.0600 M3 Papan Kayu Kelas I @Rp 5,000,000.00 Rp. 300,000.00
0.1500 Kg Paku Biasa @Rp 19,000.00 Rp. 2,850.00
0.6700 OH Pekerja @Rp 70,000.00 Rp. 46,900.00
2.0000 OH Tukang @Rp 90,000.00 Rp. 180,000.00
0.2000 OH Kepala Tukang @Rp 100,000.00 Rp. 20,000.00
0.3350 OH Mandor @Rp 90,000.00 Rp. 30,150.00
Jumlah Rp. 579,900.00
Dibulatkan Rp. 579,900.00
SNI 3434-2008-6.13
Memasang 1 M3 Kontruksi Kuda-Kuda Konvensional Kayu Kelas I
1.1000 M3 Balok Kayu Kelas I @Rp 5,000,000.00 Rp. 5,500,000.00
15.0000 Kg Besi Strip Tebal 5 mm @Rp 12,000.00 Rp. 180,000.00
5.6000 Kg Paku Biasa @Rp 19,000.00 Rp. 106,400.00
4.0000 OH Pekerja @Rp 70,000.00 Rp. 280,000.00
12.0000 OH Tukang @Rp 90,000.00 Rp. 1,080,000.00
1.2000 OH Kepala Tukang @Rp 100,000.00 Rp. 120,000.00
0.2000 OH Mandor @Rp 90,000.00 Rp. 18,000.00
Jumlah Rp. 7,284,400.00
Dibulatkan Rp. 7,284,400.00

SNI 3434-2008-6.15
Memasang 1 M3 Kontruksi Gordeng Kayu Kelas II
1.1000 M3 Balok Kayu Kelas II @Rp 3,500,000.00 Rp. 3,850,000.00
3.0000 Kg Paku Biasa @Rp 19,000.00 Rp. 57,000.00
2.4000 OH Pekerja @Rp 70,000.00 Rp. 168,000.00
7.2000 OH Tukang @Rp 90,000.00 Rp. 648,000.00
0.7200 OH Kepala Tukang @Rp 100,000.00 Rp. 72,000.00
0.1200 OH Mandor @Rp 90,000.00 Rp. 10,800.00
Jumlah Rp. 4,805,800.00
Dibulatkan Rp. 4,805,800.00

SNI 3434-2008-6.18
Memasang 1 M2 Rangka Langit - Langit 60 x 60, Kayu Kelas II
0.0154 M3 Kaso - Kaso / Kayu Klas II @Rp 3,500,000.00 Rp. 53,900.00
0.2000 Kg Paku Biasa @Rp 19,000.00 Rp. 3,800.00
0.1500 OH Pekerja @Rp 70,000.00 Rp. 10,500.00
0.3000 OH Tukang @Rp 90,000.00 Rp. 27,000.00
0.0300 OH Kepala Tukang @Rp 100,000.00 Rp. 3,000.00
0.0750 OH Mandor @Rp 90,000.00 Rp. 6,750.00
Jumlah Rp. 104,950.00
Dibulatkan Rp. 104,950.00

SNI 3434-2008-6.21
Memasang 1 M' Lisplank Ukuran (3 x 20) Cm, Kayu Kelas I
0.0108 M3 Papan Kayu Klas I @Rp 3,500,000.00 Rp. 37,800.00
0.1000 Kg Paku Biasa @Rp 19,000.00 Rp. 1,900.00
0.1000 OH Pekerja @Rp 70,000.00 Rp. 7,000.00
0.2000 OH Tukang @Rp 90,000.00 Rp. 18,000.00
0.0200 OH Kepala Tukang @Rp 100,000.00 Rp. 2,000.00
0.0050 OH Mandor @Rp 90,000.00 Rp. 450.00
Jumlah Rp. 67,150.00
Dibulatkan Rp. 67,150.00

VII. PEKERJAAN PENUTUP LANTAI DAN DINDING


SNI 7395-2008-6.36
Memasang 1 M2 Lantai Keramik Ukuran 20 x 20 Cm Unpolished
0.0450 M3 Pasir Pasang @Rp 500.00 Rp. 22.50
26.5000 Buah Keramik 20 x 20 cm Unpolished @Rp 2,500.00 Rp. 66,250.00
10.4000 Kg Semen Portland @Rp 71,000.00 Rp. 738,400.00
1.6200 Kg Semen Warna @Rp 54,000.00 Rp. 87,480.00
0.2700 OH Pekerja @Rp 70,000.00 Rp. 18,900.00
0.1350 OH Tukang @Rp 90,000.00 Rp. 12,150.00
0.0140 OH Kepala Tukang @Rp 100,000.00 Rp. 1,400.00
0.0140 OH Mandor @Rp 90,000.00 Rp. 1,260.00
Jumlah Rp. 925,862.50
Dibulatkan Rp. 925,862.50
SNI 7395-2008-6.54
1 M2 Dinding Keramik 20 x 25 Cm
0.0180 M3 Pasir Pasang @Rp 500.00 Rp. 9.00
26.5000 Buah Keramik 20 x 25 cm @Rp 3,000.00 Rp. 79,500.00
9.3000 Kg Semen Portland @Rp 71,000.00 Rp. 660,300.00
1.9400 Kg Semen Warna @Rp 54,000.00 Rp. 104,760.00
0.9000 OH Pekerja @Rp 70,000.00 Rp. 63,000.00
0.4500 OH Tukang @Rp 90,000.00 Rp. 40,500.00
0.0450 OH Kepala Tukang @Rp 100,000.00 Rp. 4,500.00
0.0450 OH Mandor @Rp 90,000.00 Rp. 4,050.00
Jumlah Rp. 956,619.00
Dibulatkan Rp. 956,619.00

SNI 7395-2008-6.34a
Memasang 1 M2 Lantai Keramik 40 x 40 Cm
0.0450 M3 Pasir Pasang @Rp 500.00 Rp. 22.50
6.6300 Buah Keramik 40 x 40 cm Polished @Rp 13,000.00 Rp. 86,190.00
9.8000 Kg Semen Portland @Rp 71,000.00 Rp. 695,800.00
1.3000 Kg Semen Warna @Rp 54,000.00 Rp. 70,200.00
0.7000 OH Pekerja @Rp 70,000.00 Rp. 49,000.00
0.3500 OH Tukang @Rp 90,000.00 Rp. 31,500.00
0.0350 OH Kepala Tukang @Rp 100,000.00 Rp. 3,500.00
0.0350 OH Mandor @Rp 90,000.00 Rp. 3,150.00
Jumlah Rp. 939,362.50
Dibulatkan Rp. 939,362.00

SNI7395-2008-6.15
Memasang 1 M2 Lantai Keramik 30 x 30 Cm Polished
0.0450 M3 Pasir Pasang @Rp 500.00 Rp. 22.50
11.8700 Buah Keramik 30 x 30 cm Unpolished @Rp 5,200.00 Rp. 61,724.00
10.0000 Kg Semen Portland @Rp 71,000.00 Rp. 710,000.00
1.5000 Kg Semen Warna @Rp 54,000.00 Rp. 81,000.00
0.2600 OH Pekerja @Rp 70,000.00 Rp. 18,200.00
0.1300 OH Tukang @Rp 90,000.00 Rp. 11,700.00
0.0130 OH Kepala Tukang @Rp 100,000.00 Rp. 1,300.00
0.0130 OH Mandor @Rp 90,000.00 Rp. 1,170.00
Jumlah Rp. 885,116.50
Dibulatkan Rp. 885,116.50

SNI7395-2008-6.15.a
Memasang 1 M2 Lantai Keramik 30 x 30 Cm Unpolished
0.0450 M3 Pasir Pasang @Rp 500.00 Rp. 22.50
11.8700 Buah Keramik 30 x 30 cm Unpolished @Rp 5,200.00 Rp. 61,724.00
10.0000 Kg Semen Portland @Rp 71,000.00 Rp. 710,000.00
1.5000 Kg Semen Warna @Rp 54,000.00 Rp. 81,000.00
0.2600 OH Pekerja @Rp 70,000.00 Rp. 18,200.00
0.1300 OH Tukang @Rp 90,000.00 Rp. 11,700.00
0.0130 OH Kepala Tukang @Rp 100,000.00 Rp. 1,300.00
0.0130 OH Mandor @Rp 90,000.00 Rp. 1,170.00
Jumlah Rp. 885,116.50
Dibulatkan Rp. 885,116.50
VIII. PEKERJAAN LANGIT-LANGIT
SNI 2839-2008-6.1
1 M2 Pasang Plafond Asbes Semen
1.1000 M2 Asbes Semen @Rp 15,000.00 Rp. 16,500.00
0.0100 Kg Paku @Rp 19,000.00 Rp. 190.00
0.0300 OH Pekerja @Rp 70,000.00 Rp. 2,100.00
0.0700 OH Tukang @Rp 90,000.00 Rp. 6,300.00
0.0070 OH Kepala Tukang @Rp 100,000.00 Rp. 700.00
0.0040 OH Mandor @Rp 90,000.00 Rp. 360.00
Jumlah Rp. 26,150.00
Dibulatkan Rp. 26,150.00

SNI 2839-2008-6.5
1 M2 Pasang Plafond Tripleks Tebal 4 mm
0.3750 Lembar Tripleks Tebal 4 mm @Rp 25,000.00 Rp. 9,375.00
0.0300 Kg Paku @Rp 4,000.00 Rp. 120.00
0.1000 OH Pekerja @Rp 70,000.00 Rp. 7,000.00
0.1000 OH Tukang @Rp 90,000.00 Rp. 9,000.00
0.0100 OH Kepala Tukang @Rp 100,000.00 Rp. 1,000.00
0.0050 OH Mandor @Rp 90,000.00 Rp. 450.00
Jumlah Rp. 26,945.00
Dibulatkan Rp. 26,945.00

SNI 2839-2008-6.10
1 M' Pasang List Langit - Langit Kayu Profil
1.0500 M' List Kayu Profil @Rp 5,000.00 Rp. 5,250.00
0.0100 Kg Paku Kayu Biasa @Rp 19,000.00 Rp. 190.00
0.0500 OH Pekerja @Rp 70,000.00 Rp. 3,500.00
0.0500 OH Tukang @Rp 90,000.00 Rp. 4,500.00
0.0050 OH Kepala Tukang @Rp 100,000.00 Rp. 500.00
0.0030 OH Mandor @Rp 90,000.00 Rp. 270.00
Jumlah Rp. 14,210.00
Dibulatkan Rp. 14,210.00

X. PEKERJAAN KUNCI DAN KACA


SNI 03-3431-2002-6.2
1 Buah Kunci Tanam Biasa
1.0000 Buah Kunci Tanam Biasa @Rp 160,000.00 Rp. 160,000.00
0.0100 OH Pekerja @Rp 70,000.00 Rp. 700.00
0.5000 OH Tukang @Rp 90,000.00 Rp. 45,000.00
0.0100 OH Kepala Tukang @Rp 100,000.00 Rp. 1,000.00
0.0050 OH Mandor @Rp 90,000.00 Rp. 450.00
Jumlah Rp. 207,150.00
Dibulatkan Rp. 207,150.00

SNI 03-3431-2002-6.5
1 Buah Engsel Pintu
1.0000 Psg Engsel Pintu @Rp 12,650.00 Rp. 12,650.00
0.0150 OH Pekerja @Rp 70,000.00 Rp. 1,050.00
0.1500 OH Tukang @Rp 90,000.00 Rp. 13,500.00
0.0150 OH Kepala Tukang @Rp 100,000.00 Rp. 1,500.00
0.0008 OH Mandor @Rp 90,000.00 Rp. 67.50
Jumlah Rp. 28,767.50
Dibulatkan Rp. 28,767.50
SNI 03-3431-2002-6.6
1 Buah Engsel Jendela Kupu - Kupu
1.0000 Psg Engsel Jendela @Rp 10,000.00 Rp. 10,000.00
0.0100 OH Pekerja @Rp 70,000.00 Rp. 700.00
0.1000 OH Tukang @Rp 90,000.00 Rp. 9,000.00
0.0100 OH Kepala Tukang @Rp 100,000.00 Rp. 1,000.00
0.0005 OH Mandor @Rp 90,000.00 Rp. 45.00
Jumlah Rp. 20,745.00
Dibulatkan Rp. 20,745.00
SNI 03-3431-2002-6.9
1 Buah Kait Angin Jendela
1.0000 Buah Kait Angin @Rp 10,000.00 Rp. 10,000.00
0.0150 OH Pekerja @Rp 70,000.00 Rp. 1,050.00
0.1500 OH Tukang @Rp 90,000.00 Rp. 13,500.00
0.0150 OH Kepala Tukang @Rp 100,000.00 Rp. 1,500.00
0.0008 OH Mandor @Rp 90,000.00 Rp. 67.50
Jumlah Rp. 26,117.50
Dibulatkan Rp. 26,117.50

SNI 03-3431-2002-6.17
1 M2 Pasang Kaca Tebal 5 mm
1.1000 M2 Kaca Tebal 5 mm @Rp 57,500.00 Rp. 63,250.00
0.0150 OH Pekerja @Rp 70,000.00 Rp. 1,050.00
0.1500 OH Tukang @Rp 90,000.00 Rp. 13,500.00
0.0150 OH Kepala Tukang @Rp 100,000.00 Rp. 1,500.00
0.0008 OH Mandor @Rp 90,000.00 Rp. 67.50
Jumlah Rp. 79,367.50
Dibulatkan Rp. 79,367.50

XI. PEKERJAAN PENGECATAN


SNI 03-2839-2002-6.8
1 M2 Pengecatan Bidang Kayu Baru
0.2000 Kg Cat Meni @Rp 21,000.00 Rp. 4,200.00
0.1500 Kg Plamir @Rp 85.71 Rp. 12.86
0.1700 Kg Cat Dasar @Rp 25,000.00 Rp. 4,250.00
0.2600 Kg Cat Kayu 2 Kali @Rp 44,000.00 Rp. 11,440.00
0.0700 OH Pekerja @Rp 70,000.00 Rp. 4,900.00
0.0090 OH Tukang @Rp 90,000.00 Rp. 810.00
0.0060 OH Kepala Tukang @Rp 100,000.00 Rp. 600.00
0.0025 OH Mandor @Rp 90,000.00 Rp. 225.00
Jumlah Rp. 26,437.86
Dibulatkan Rp. 26,437.00
SNI 03-2839-2002-6.14
1 M2 Pengecatan Bidang Tembok Baru
0.1000 Kg Plamir @Rp 85.71 Rp. 8.57
0.1000 Kg Cat Dasar @Rp 25,000.00 Rp. 2,500.00
0.2600 Kg Cat Tembok 2 Kali @Rp 30,000.00 Rp. 7,800.00
0.0200 OH Pekerja @Rp 70,000.00 Rp. 1,400.00
0.0630 OH Tukang @Rp 90,000.00 Rp. 5,670.00
0.0063 OH Kepala Tukang @Rp 100,000.00 Rp. 630.00
0.0025 OH Mandor @Rp 90,000.00 Rp. 225.00
Jumlah Rp. 18,233.57
Dibulatkan Rp. 18,233.00
LAMPIRAN PERHITUNGAN KILOGRAM BESI PER METER KUBIT BETON

Besi Berat Vol. Beton Panjang Jumlah Jumlah S Jumlah Jumlah


No. Uraian (ø) (kg) M3 M' (Btg) Volume Volume Berat
(Kg) (Kg) (Kg/m3)

1 Pondasi
ø16 1.578 1.000 10.000 15.782
0.300 31.565 105.216
ø 16 1.578 1.000 10.000 15.782

1 Sloof 30/40
ø16 1.578 1.000 12.000 18.939
0.120 22.806 190.046
ø8 0.395 1.400 7.000 3.867

2 Kolom 30/40
ø16 1.578 1.000 4.000 6.313
0.120 19.653 163.778
ø8 0.395 1.400 7.000 3.871

ø16 1.578 1.000 6.000 9.469

3 Kolom 30/30
ø16 1.578 1.000 4.000 6.313
0.090 15.944 177.155
ø8 0.395 1.200 7.000 3.318

ø16 1.578 1.000 4.000 6.313


4 Kolom 30/40
ø16 1.578 1.000 8.000 12.626
0.120 16.497 137.474
ø8 0.395 1.400 7.000 3.871
5 Kolom 30/30
ø16 1.578 1.000 8.000 12.626
0.090 16.497 183.299
ø8 0.395 1.400 7.000 3.871
6 Kolom Praktis 13/13
ø10 0.617 1.000 4.000 2.466
0.017 3.793 224.450
ø8 0.395 0.480 7.000 1.327

7 Balok 30/50
ø16 1.578 1.000 10.000 15.782
0.150 26.519 176.796
ø8 0.395 1.600 7.000 4.424

ø16 1.578 1.000 4.000 6.313

8 Balok 30/40
ø16 1.578 1.000 10.000 15.782
0.120 22.070 183.917
ø8 0.395 1.400 7.000 3.871

ø14 1.208 1.000 2.000 2.417

9 Balok 20/40
ø16 1.578 1.000 5.000 7.891
0.080 13.626 170.324
ø8 0.395 1.200 7.000 3.318

ø14 1.208 1.000 2.000 2.417


Besi Berat Vol. Beton Panjang Jumlah Jumlah S Jumlah Jumlah
No. Uraian (ø) (kg) M3 M' (Btg) Volume Volume Berat
(Kg) (Kg) (Kg/m3)

10 Balok 25/30
ø14 1.208 1.000 4.000 4.833
0.075 10.015 133.534
ø8 0.395 1.000 7.000 2.765

ø14 1.208 1.000 2.000 2.417

11 Balok Latai 13/15


ø12 0.888 1.000 4.000 3.552
0.020 4.824 247.379
ø8 0.395 0.460 7.000 1.272

12 Ring Balok 13/15


ø12 0.888 1.000 4.000 3.552
0.020 4.824 247.379
ø8 0.395 0.460 7.000 1.272

13 Balok Ornamen 30/40


ø16 1.578 1.000 10.000 15.782
0.120 19.653 163.778
ø8 0.395 1.400 7.000 3.871

14 Plat lantai T = 12 cm
ø10 0.617 1.000 12.000 7.398
0.120 14.796 123.300
ø10 0.617 1.000 12.000 7.398

15 Plat Bordes T = 15 cm
ø12 0.888 1.000 12.000 10.653
0.150 21.306 142.042
ø12 0.888 1.000 12.000 10.653

0
0
Banda Aceh, 25 April 2017
CV. MEGAH KARYA KOSNTRUKSI

0
0
PERHITUNGAN VOLUME

Pekerjaan : Pembangunan Perpustakaan dan Laboratorium SMPN 14 Banda Aceh


Lokasi : Komplek Budha Suchi - Kota Banda Aceh
### ###
###

Lebar Lebar Jumlah


No. Pekerjaan Panjang Lebar Tinggi Banyak Jumlah
Atas Bawah Dibulatkan

III. PEMBANGUAN RUANG KELAS BLOCK C


### PEKERJAAN TANAH DAN PASIR
### Galian Tanah Pondasi Tapak Type I 2.200 2.200 1.650 20.000 159.720 M3 174.635 M3
Cicin sumuran (лr²) 0.785 0.950 3.140 0.500 20.000 14.915 M3
174.635 M3

### Galian Tanah Pondasi Tapak Type II 1.700 1.700 1.650 16.000 76.296 M3
Cicin sumuran (лr²) 0.785 0.950 3.140 0.500 16.000 11.932 M3
2.000 1.700 1.650 1.000 5.610 M3
93.838 M3 93.838 M3

### Galian Tanah Pondasi Menerus 104.000 0.400 0.450 18.720 M3 18.720 M3

### Urugan Tanah 1/4 x Galian 71.798 M3 71.798 M3

### Urugan Pasir di bawah Pondasi 104.000 0.400 0.050 2.080 M3 9.402 M3
2.200 2.200 0.050 20.000 4.840 M3
1.700 1.700 0.050 16.000 2.312 M3
2.000 1.700 0.050 1.000 0.170 M3
9.402 M3

### Pondasi Batu Kali 1 : 4 104.000 0.250 0.400 0.200 0.300 10.400 M3 10.400 M3

### Cincin Sumur 2.000 20.000 40.000 M3


2.000 16.000 32.000 M3
72.000 M3 72.000 M3

### Beton Cor 1 : 2 : 3 Isian Sumuran 0.785 1.000 3.140 0.500 20.000 15.700 M3
0.785 1.000 3.140 0.500 16.000 12.560 M3
28.260 M3 28.260 M3

### Lantai Kerja di bawah Pondasi Tapak 2.200 2.200 0.100 20.000 9.680 M3
1.700 1.700 0.100 16.000 4.624 M3
2.000 1.700 0.100 1.000 0.340 M3
14.644 M3 14.644 M3

### PEKERJAAN BETON/BETON BERTULANG


### Beton Bertulang Pondasi Tapak 2.000 2.000 0.300 20.000 24.000 M3
1.500 1.500 0.300 16.000 10.800 M3
2.000 1.500 0.300 0.900 M3
35.700 M3 35.700 M3

### Beton Bertulang Kolom Pendestal 30/40 cm 0.400 0.300 1.450 20.000 3.480 M3
0.400 0.300 1.450 6.000 1.044 M3
4.524 M3 4.524 M3

### Beton Bertulang Kolom Pendestal 30/30 cm 0.300 0.300 1.450 10.000 1.305 M3 1.305 M3

### Beton Bertulang Sloof 30/40 cm 0.300 0.400 163.800 19.656 M3 19.656 M3

### Beton Bertulang Kolom Induk 30/40 cm 0.300 0.400 3.500 26.000 10.920 M3 10.920 M3

### Beton Bertulang Kolom Teras 30/30 cm 0.300 0.300 3.600 10.000 3.240 M3 3.240 M3

### Beton Bertulang Balok 30/50 cm 0.300 0.500 28.000 4.200 M3 4.200 M3

### Beton Bertulang Balok 30/40 cm 0.300 0.400 171.800 20.616 M3 20.616 M3

### Beton Bertulang Balok 20/40 cm 0.200 0.400 4.500 0.360 M3 0.360 M3

### Beton Bertulang Balok Latai 13/15 cm 0.130 0.150 70.000 1.365 M3 1.365 M3

### Beton Bertulang Ring Balok untuk selasar 13/15 cm 0.130 0.150 44.000 0.858 M3 0.858 M3

### Beton Bertulang Balok Ornamen Teras 30/40 cm 0.400 0.300 0.400 12.000 0.576 M3 0.576 M3

### Beton Bertulang Plat Lantai t = 12 cm 36.000 9.000 0.120 38.880 M3


4.000 4.000 0.120 1.920 M3
40.800 M3
Dikurangi balok Memajang 144.000 0.300 0.120 5.184 M3
Dikurangi balok Melintang 72.000 0.300 0.120 2.592 M3
7.776 M3
33.024 M3 33.024 M3

### Beton Bertulang Plat Bordes dan Anak Tangga 6.700 2.000 0.150 2.010 M3
4.000 3.000 0.150 1.800 M3
3.810 M3 3.810 M3
Lebar Lebar Jumlah
No. Pekerjaan Panjang Lebar Tinggi Banyak Jumlah
Atas Bawah Dibulatkan
LANTAI II
### Beton Bertulang Kolom Induk 30/40 cm 3.700 0.300 0.400 26.000 11.544 M3 11.544 M3

### Beton Bertulang Kolom Teras 30/30 cm 3.700 0.300 0.300 10.000 3.330 M3 3.330 M3

### Beton Bertulang Balok 25/30 cm 125.000 0.250 0.300 1.000 9.375 M3 9.375 M3

### Beton Bertulang Balok Latai 13/15 cm 72.800 0.130 0.150 1.000 1.420 M3 1.420 M3

### Beton Bertulang untuk selasar 13/15 cm (dudukan batu bata) 44.000 0.130 0.150 1.000 0.858 M3 0.858 M3

### #NAME?
LANTAI I
### Pasangan Trasram Bata 1 PC : 2 PS di bawah Lantai 95.300 0.400 38.120 M2
38.120 M2 38.120 M2

2 Plesteran Trasram Bata 1 PC : 2 PS di bawah Lantai 76.240 M2 76.240 M2

### Pasangan Dinding Bata 1 PC : 4 PS 104.400 3.350 349.740 M2


3.700 3.350 12.395 M2
362.135 M2
Dikurangi Jendela, Pintu
Pintu Type. P-1 Bagian Lantai bawah 2.600 1.300 4.000 13.520 M2
Jendela Type J-1 Bagian Lantai bawah 2.650 1.400 12.000 44.520 M2
Jendela Type J-12 Bagian Lantai bawah 2.000 1.400 4.000 11.200 M2
69.240 M2
Pas. Batu Bata Dikurangi Pintu, Jendela, kolom,dll 292.895 M2 292.895 M2
Pasangan Batu Bata lantai atas dan Bawah

4 Plesteran Dinding Bata 1 PC : 4 PS Pleteran Dikurangi 585.790 M1 585.790 M1

5 #NAME?

#NAME?
### Pasangan Dinding Bata 1 PC : 4 PS 85.600 3.550 303.880 M2 M2
3.700 3.550 13.135 M2
303.880 M2
Dikurangi
Pas. Batu Kerawang Bagian Lantai atas 2.000 1.660 1.000 3.320 M2
Pintu Type. P-1 Bagian Lantai bawah 2.600 1.300 4.000 13.520 M2
Jendela Type J-1 Bagian Lantai bawah 2.650 1.400 12.000 44.520 M2
Jendela Type J-12 Bagian Lantai bawah 2.000 1.400 4.000 11.200 M2
72.560 M2
Pas. Batu Bata Dikurangi Pintu, Jendela, kolom,dll 231.320 M2

### Plesteran Dinding Bata 1 PC : 4 PS - M2 M2

E. PEKERJAAN LANTAI
Pekerjaan Timbunan dan Urugan
1 Timbunan Tanah Bawah Lantai Ruangan 8.870 6.870 0.620 4.000 151.124 M3 151.124 M3
4.370 6.870 0.620 1.000 18.614 M3
169.737 M3

2 Timbunan Tanah di Bawah Selasar 40.000 1.370 0.570 31.236 M3


40.000 1.870 0.570 42.636 M3
10.370 1.370 0.570 2.000 16.196 M3
90.068 M3 90.068 M3

3 Urugan Pasir di Bawah Lantai Ruangan 8.870 6.870 0.100 4.000 24.375 M3 24.375 M3
4.370 6.870 0.100 1.000 3.002 M3
27.377 M3

4 Urugan Pasir di Bawah Lantai Selasar 40.000 1.370 0.100 5.480 M3


40.000 1.870 0.100 7.480 M3
10.370 1.370 0.100 2.000 2.841 M3
15.801 M3 15.801 M3
#NAME?
### Beton Tumbuk di Bawah Lantai Keramik t = 5 cm Ruangan 8.870 6.870 0.050 4.000 12.187 M3 13.688 M3
4.370 6.870 0.050 1.000 1.501 M3
13.688 M3

### Beton Tumbuk di Bawah Lantai Keramik t = 5 cm Selasar 40.000 1.370 0.050 2.740 M3
40.000 1.870 0.050 3.740 M3
10.370 1.370 0.050 2.000 1.421 M3
7.901 M3 7.901 M3

### Lantai Keramik 40 x 40 cm Ruangan 8.870 6.870 4.000 243.748 M2 273.770 M2


4.370 6.870 1.000 30.022 M2
273.770 M2

### Lantai Keramik 40 x 40 cm Anti Slip Pada Selasar 40.000 1.370 54.800 M2
40.000 1.870 74.800 M2
10.370 1.370 2.000 28.414 M2
158.014 M2 158.014 M2
Lebar Lebar Jumlah
No. Pekerjaan Panjang Lebar Tinggi Banyak Jumlah
Atas Bawah Dibulatkan
### #NAME? 2.000 0.200 20.000 8.000 M2
2.000 0.300 20.000 12.000 M2
3.500 4.000 1.000 14.000 M2
34.000 M2 34.000 M2

7 #NAME? 6.000 M3 6.000 M3

#NAME?
1 #NAME? 8.870 6.870 4.000 243.748 M3 M3
4.500 2.000 9.000

2 #NAME? 40.000 2.000 80.000 M2 M2


4.500 2.000 9.000 M2
89.000 M2

3 #NAME? 4.000 M2 M2

### #NAME?
#NAME?
### Kayu Kanopi Kuda-kuda Terpasang 10.000 Bh 10.000 Bh

2 Memasang Gording Kayu 120.000 0.050 0.050 0.300 M3 0.300 M3

3 Memasang Atap Genteng Metal 42.000 1.800 75.600 M2 75.600 M2

4 Kayu Listplank Uk. 3/20 cm 42.000 42.000 M' 42.000 M'

5 #NAME? 6.870 8.870 4.000 243.748 M2


39.870 1.870 74.557 M2
39.870 1.200 47.844 M2
Plafond Dikurangi 366.149 M2 366.149 M2
M' - M'
6 #NAME? 6.870 8.870 4.000 243.748 M2
39.870 1.870 74.557 M2
39.870 1.200 47.844 M2
jumlah 366.149 M2 366.149 M2

### #NAME? jumlah - 366.149 M2 366.149 M2


14.646
#NAME?
### Rangka Kuda-Kuda dan Gording Zincalume Type 100, 35.250 7.650 28.400 42.100 2.000 539.325
Penutup Atap dan Rabung Genteng Metal + Terpasang (SNI) 11.880 7.650 0.500 2.000 90.882
630.207 M2 M2

### Kayu Listplank Uk. 3/20 cm 107.960 0.250 26.990 M2 M2

### #NAME? 6.870 8.870 4.000 243.748 M2


102.000 1.000 102.000 M2
39.870 1.870 74.557 M2
Plafond Dikurangi 420.305 M2 M2

### #NAME? Pleteran Dikurangi - 420.305 M2 M2

### #NAME? 31.080 4.000 124.320 M' M'


182.000 182.000 M'
306.320 M'
12.253
G. PEKERJAAN PINTU, JENDELA DAN KUNCI
1 Pintu Type P1
a. Kosen Kayu 5/13 7.600 0.130 0.050 4.000 0.198 M³ 0.198 M³

b. Daun Pintu Panel Ukuran 60 x 210 cm x 2 2.100 1.200 8.000 20.160 M² 20.160 M²

c. Ventilasi Ambang Ukuran 40 x 60 cm 1.800 0.070 8.000 1.008 M² 1.008 M²

d. Kunci Tanam Bulat 4.000 Buah 4.000 Buah

e. Pegangan Pintu 4.000 Buah 4.000 Buah

f. Engsel Pintu 12.000 12.000 Psg 12.000 Psg

g. Engsel Ventilasi 8.000 8.000 Psg 8.000 Psg

h. Hak Angin Jendela / Ventilasi 16.000 16.000 Buah 16.000 Buah

i. Grendel Ventilasi 8.000 8.000 Buah 8.000 Buah

j. Tarikan Jendela 8.000 8.000 Buah 8.000 Buah

h. Kaca 5 mm 0.300 0.500 8.000 1.200 M2 1.200 M2


Lebar Lebar Jumlah
No. Pekerjaan Panjang Lebar Tinggi Banyak Jumlah
Atas Bawah Dibulatkan
### Jendela Ambang Kaca Type J1 (24 Unit)
### Kosen Kayu 5/13 14.950 0.130 0.050 12.000 1.166 ### 1.166 #NAME?

### Daun Jendela Ukuran 60 x 85 cm 2.700 0.130 0.050 48.000 0.842 ### 0.842 #NAME?

### Ventilasi Ambang Ukuran 40 x 60 cm 1.800 0.130 0.050 48.000 0.562 ### 0.562 #NAME?

### Engsel Jendela 48.000 ### 48.000 #NAME?

### Engsel Ventilasi 48.000 ### 48.000 #NAME?

### Grendel Jendela / Ventilasi 96.000 ### 96.000 #NAME?

### Hak Angin Jendela / Ventilasi 192.000 ### 192.000 #NAME?

### Tarikan Jendela 96.000 ### 96.000 #NAME?

### #NAME? 0.300 0.500 48.000 7.200 M2


0.750 0.500 48.000 18.000
25.200 M2 25.200 M2

3 Jendela Ambang Kaca Type J1 (4 Unit)


a. Kosen Kayu 5/13 11.600 0.130 0.050 4.000 0.302 M³ 0.302 M³

b. Daun Jendela Ukuran 85 x 90 cm 2.700 0.130 0.050 12.000 0.211 M2 0.211 M2

c. Ventilasi Ambang Ukuran 40 x 60 cm 1.800 0.130 0.050 12.000 0.140 M2 0.140 M2

d. Engsel Jendela 12.000 Psg 12.000 Psg

e. Engsel Ventilasi 12.000 Psg 12.000 Psg

f. Grendel Jendela / Ventilasi 24.000 Buah 24.000 Buah

g. Hak Angin Jendela / Ventilasi 48.000 Buah 48.000 Buah

h. Tarikan Jendela 24.000 Buah 24.000 Buah

i. Kaca 5 mm 0.300 0.500 12.000 1.800


0.750 0.500 12.000 4.500
6.300 M2 6.300 M2
### #NAME?
### Armatur
- Lampu HE 18 Watt Setara Hannoch 112.000 112.000
### Stop Kontak 16.000 16.000
### Instalasi titik penerangan, instalasi termasuk kabel 112.000 112.000
NYA 3 x 2.5 mm dalam pipa PVC fitting lampu dan
kelengkapan instalasi terpasang
### Instalasi titik kontak, instalasi termasuk kabel 16.000 16.000
NYA 3 x 2.5 mm dalam pipa PVC, kotak stop kontak
BROCO dan kelengkapan instalasi terpasang
### #NAME?
#NAME? -
#NAME? 10.000 10.000

### #NAME?
### #NAME? 40.200 630.000 655.860 1,326.060 M2 1,326.060 M2

### #NAME? 366.149 M2 366.149 M2

### Cat Kayu Lesplang dan Lis Plafond 42.000 0.210 8.820 M2 8.820 M2

### Cat Mengkilat Kosen, Daun Pintu, Jendela dan Jelusi


Kosen P1 1.727 4.000 6.908 M2
P2 2.100 1.200 2.000 4.000 16.800 M2
J1 3.292 4.000 13.168 M2
J2 4.329 1.000 4.329 M2
41.205 M2 41.205 M2

-
-
Banda Aceh, 25 April 2017
CV. MEGAH KARYA KOSNTRUKSI

-
-
GRAND TOTAL REKAPITULASI
Pekerjaan :
Pembangunan Perpustakaan dan Laboratorium SMPN 14 Banda Aceh

Lokasi : #NAME?

JUMLAH HARGA
NO. JENIS PEKERJAAN
(Rp.)

Div. A PEKERJAAN PERSIAPAN Rp. 5,500,000.00

### #NAME? Rp. #NAME?

III. PEMBANGUAN RUANG KELAS BLOCK C Rp. #NAME?

(A) JUMLAH HARGA PEKERJAAN Rp. #NAME?


(B) PPN 10 % Rp. #NAME?
(C) TOTAL HARGA PEKERJAAN Rp. #NAME?
(D) JUMLAH TOTAL DIBULATKAN Rp. #NAME?

Terbilang : ###

Banda Aceh, 12 Agustus 2015


CV. BUDI PRIMA SENTOSA

FAHMI
Direktur
REKAPITULASI
DAFTAR QUANTITAS DAN HARGA

Pekerjaan : Pembangunan Perpustakaan dan Laboratorium SMPN 14 Banda Aceh


Lokasi : Komplek Budha Suchi - Kota Banda Aceh
Tahun Anggaran : 2017

SUB JUMLAH JUMLAH HARGA


NO. URAIAN PEKERJAAN
(Rp.) (Rp.)

Div. A PEKERJAAN PERSIAPAN Rp. 5,500,000.00


Div. B PEK. STRUKTUR BANGUNAN BAWAH/PONDASI Rp. #NAME?
Div. C STRUKTUR LANTAI I Rp. #NAME?
Div. C1 PEK. STRUKTUR BANGUNAN ATAS #NAME?
Div. C2 PEK. PASANGAN DINDING Rp 60,306,298.16
Div. C3 PEK. PENUTUP LANTAI Rp 84,250,190.30
Div. C4 PEK. KUSEN PINTU & JENDELA Rp 26,024,585.36
Div. C5 PEK. PENUTUP ATAP Rp 8,910,790.35
Div. C6 PEK. PLAFOND Rp 31,652,017.65
Div. C7 PEK. INSTALASI LISTRIK Rp 12,560,000.00
Div. C8 PEK. INSTALASI AIR BERSIH & AIR KOTOR Rp 7,502,520.00
Div. C9 PEK. PENGECATAN Rp 23,021,084.68
Div. D STRUKTUR LANTAI II Rp. #NAME?
Div. D1 PEK. STRUKTUR BANGUNAN ATAS #NAME?
Div. D2 PEK. PASANGAN DINDING Rp 62,272,395.43
Div. D3 PEK. PENUTUP LANTAI Rp 47,260,337.93
Div. D4 PEK. KUSEN PINTU & JENDELA Rp 18,619,075.24
Div. D5 PEK. PENUTUP ATAP Rp 79,924,955.00
Div. D6 PEK. PLAFOND Rp 43,062,660.08
Div. D7 PEK. INSTALASI LISTRIK Rp 7,730,000.00
Div. D8 PEK. PENGECATAN Rp 24,771,256.84
Div. E PEK. LAIN-LAIN Rp. 29,769,000.00

JUMLAH Rp. #NAME?


PPN Rp. #NAME?
TOTAL Rp. #NAME?
DIBULATKAN Rp. #NAME?

Terbilang : #NAME?

Banda Aceh, 25 April 2017


CV. MEGAH KARYA KOSNTRUKSI

ZAM ZAMI
Direktur
DAFTAR QUANTITAS DAN HARGA

Pekerjaan : Pembangunan Perpustakaan dan Laboratorium SMPN 14 Banda Aceh


Lokasi : Komplek Budha Suchi - Kota Banda Aceh
Tahun Anggaran : 2017

HARGA
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA SATUAN
(Rp.)
1 2 3.00 4 5 6

Div. A PEKERJAAN PERSIAPAN


1 Pengukuran dan Pemasangan Bouwplank 1.00 Pkt Taksir 1,000,000.00
2 Biaya Administrasi pelaporan & Dokumentasi 1.00 Pkt Taksir 1,000,000.00
3 Pembongkaran bangunan lama & Pembongkaran 2 btg pohon 1.00 Pkt Taksir 1,000,000.00
4 Pengujian Mutu Beton 1.00 Pkt Taksir 2,000,000.00
5 Pembuatan Papan Nama Proyek 1.00 Pkt Taksir 500,000.00
JUMLAH
Div. B PEK. STRUKTUR BANGUNAN BAWAH/PONDASI
Pondasi Sumuran & Tapak
1 Galian Tanah Pondasi 212.93 M3 A. 2.3.1.3 87,483.00
2 Urug Bekas Galian 74.52 M3 A. 2.3.1.9 20,042.00
3 Pasir Alas Pondasi 2.57 M3 A. 2.3.1.11 156,090.00
Pasangan Batu Kosong t=15 cm M3
4 Beton Cor Lantai Kerja t : 10 cm 5.13 M3 A. 4.1.1.2 936,951.23
5 Beton Bertulang Cincin Sumuran t : 15 cm 23.61 M3 Supl. PS.1 5,028,600.00
6 Beton Cyclope isian sumuran t ; 100 cm 25.43 M3 A. 3.2.1.10 3,336,320.86
7 Beton K. 250 isian sumuran t : 100 cm 25.43 M3 A. 4.1.1.8 1,132,784.79
8 Poor pondasi tapak uk. 120x120x45 cm 13.29 M3 Supl. TP.1 #NAME?
9 Poor pondasi tapak uk. 100x100x45 cm 4.50 M3 Supl. TP.1 #NAME?
10 Stik Kolom/Pedestal uk. 35x35 cm 6.53 M3 Supl. Kl.1 #NAME?
11 Stik Kolom/Pedestal uk. 30x30 cm 1.85 M3 Supl. Kl.2 #NAME?
12 Sloof Beton uk. 25x40 cm 12.78 M3 Supl.SL.1 #NAME?
13 Sloof Beton uk. 20x35 cm 1.40 M3 Supl.SL.2 #NAME?
Pondasi Batu Gunung
1 Galian Tanah Pondasi 60.18 M3 A. 2.3.1.3 87,483.00
2 Urug Bekas Galian 21.07 M3 A. 2.3.1.9 20,042.00
3 Pasir Alas Pondasi 3.70 M3 A. 2.3.1.11 156,090.00
4 Pasangan Batu Kosong 7.71 M3 A. 3.2.1.9 299,541.00
5 Pondasi Batu Gunung/Kali 47.18 M3 A. 3.2.1.2 661,320.00
Pondasi Trap Tangga, Ram & Pas. Bunga
1 Galian Tanah Pondasi 4.59 M3 A. 2.3.1.3 87,483.00
2 Urug Bekas Galian 1.61 M3 A. 2.3.1.9 20,042.00
3 Pasir Alas Pondasi 0.86 M3 A. 2.3.1.11 156,090.00
4 Beton Cor Lantai Kerja t : 10 cm 1.73 M3 A. 4.1.1.2 936,951.23
5 Pasangan Batu Bata 1 : 2 18.16 M2 A. 4.4.1.7 121,871.75
6 Plesteran Batu Bata 1 : 2 36.32 M2 A. 4.4.2.2 58,907.64
JUMLAH
Div. C LANTAI 1
Div. C1 PEK. STRUKTUR BANGUNAN ATAS
Struktur Utama
1 Kolom beton K1 uk. 35x35 cm 13.06 M3 Supl. Kl.1 #NAME?
2 Kolom beton K2 uk. 30x30 cm 3.69 M3 Supl. Kl.2 #NAME?
3 Kolom Praktis 13 x 13 cm 0.07 M3 Supl. Kl.3 #NAME?
4 Balok Lantai BL1. uk. 25x60 cm 3.99 M3 Supl. BL.1 #NAME?
5 Balok Lantai BL2. uk. 25x40 cm 8.55 M3 Supl. BL.2 #NAME?
6 Balok Lantai BL3. uk. 25x40 cm 3.59 M3 Supl. BL.2 #NAME?
7 Balok Lantai BL4. uk. 25x35 cm 3.59 M3 Supl. BL.3 #NAME?
8 Balok latai uk. 15x20 cm 0.99 M3 Supl. BL.4 #NAME?
9 Balok latai uk. 13x15 cm 1.64 M3 Supl. BL.5 #NAME?
10 Plat lantai 2, t : 12 cm 23.25 M3 Supl. PB.1 #NAME?
11 Plat Meja beton t : 12 cm 1.44 M3 Supl. PB.3 #NAME?
12 Plat Kanopy Teras beton t : 10 cm 0.15 M3 Supl. PB.2 #NAME?
13 Besi Stik Kolom K1 Lt. 2 347.98 Kg A. 4.1.1.17a 17,766.10
14 Besi Stik Kolom K2 Lt. 2 121.45 Kg A. 4.1.1.17a 17,766.10
Struktur Tangga
1 Balok Bordes BT1. uk. 20x30 cm 0.59 M3 Supl. BL.6 #NAME?
2 Plat Tangga Bordes dan Tangga 1.77 M3 Supl. PB.4 #NAME?
3 Anak Tangga / Pijakan 0.78 M3 Supl. PB.4 #NAME?
HARGA
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA SATUAN
(Rp.)
1 2 3.00 4 5 6

JUMLAH
HARGA
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA SATUAN
(Rp.)
1 2 3.00 4 5 6

Div. C2 PEK. PASANGAN DINDING


1 Pasangan Bata 1 : 2 31.72 M2 A. 4.4.1.7 121,871.75
2 Pasangan Bata 1 : 4 241.20 M2 A. 4.4.1.9 111,468.50
3 Plesteran Bata 1 : 2 63.44 M2 A. 4.4.2.2 58,907.64
4 Plesteran Bata 1 : 4 482.39 M2 A. 4.4.2.4 53,519.40
JUMLAH
Div. C3 PEK. PENUTUP LANTAI
1 Tanah Urug Dibawah Lantai dan Ram 123.38 M3 A. 2.3.1.11a 100,925.00
2 Pasir Urug Dibawah Lantai dan Ram 24.83 M3 A. 2.3.1.11 156,090.00
3 Beton Cor Lantai t = 5 cm + Acian dan Ram 12.53 M3 A. 4.1.1.2 936,951.23
4 Pas. Keramik lantai ruangan uk. 40x40 cm 179.89 M2 A. 4.4.3.9a 210,982.75
5 Pas. Keramik lantai Teras dan Ram uk. 40x40 cm 61.80 M2 A. 4.4.3.9a 210,982.75
6 Pas. Keramik lantai Tangga uk. 40x40 cm 17.43 M2 A. 4.4.3.9a 210,982.75
7 Pas. Step Nozing uk. 5x40 cm 30.25 M' Taksir 50,000.00
JUMLAH
Div. C4 PEK. KUSEN PINTU & JENDELA
Spesifikasi Daun pintu rangka Kayu klas I, panel blockbot t :
18 mm & jendela rangka alumunium lama dan pemasangan
kaca t : 5 mm, terpasang dengan acsesories antara lain :
kunci 2 slaag, engsel, grendel, hak angin, kaca rayben 5 mm
biaya sudah termasuk pemasangan
1 Kusen Kayu Pintu 0.29 M3 A. 4.6.1.1 7,133,225.00
2 Perakitran Kembali & Pemasangan Kosen Alumunium 123.80 M' Taksir 100,000.00
Daun Pintu Buka dua Rangka kayu Klas I, Panel Blockboot t :
3 2.00 Unit Taksir 1,700,000.00
18 cm type P1+ Aksesoris terpasang
Daun Pintu Buka satu Rangka kayu klas I, Panel Blockboot t :
4 3.00 Unit Taksir 1,700,000.00
18 cm Type P2 + Aksesoris terpasang
Perakitan kembali & Pemasangan Daun Jendela Type J1 +
5 14.00 Unit Taksir 100,000.00
Aksesoris terpasang
6 Ventilasi Kaca Silang t : 5 mm 18.11 M2 A. 4.6.2.17 92,542.80
JUMLAH
Div. C5 PEK. PENUTUP ATAP
Spesifikasi material penutup atap dan rabung seng BJLS
0,35 mm meliputi biaya pengadaan, pemasangan/perakitan
kembali.
1 Rangka Kuda-kuda Kayu Klas II 0.14 M3 A. 4.6.1.13 5,975,200.00
2 Gording Kayu Klas II 0.19 M3 A. 4.6.1.15 7,044,565.00
3 Atap Seng Spandex BJLS 0,35 mm 27.00 M2 A. 4.5.2.32 92,290.00
4 Rabung Seng Spandex BJLS 0,35 mm 27.00 M' A. 4.5.2.36 100,012.00
5 Papan Lisplank Kayu Klas II 29.00 M' A. 4.6.1.22 53,229.00
JUMLAH
Div. C6 PEK. PLAFOND
1 Pemasangan Rangka Plafond 221.65 M2 A. 4.6.1.20 85,789.00
2 Pemasangan Plafond Multyplek T = 3,6 mm 221.65 M2 A. 4.5.1.5 48,532.00
3 List Profil Plafond 130.25 M' A. 4.5.1.9 14,432.00
JUMLAH
Div. C7 PEK. INSTALASI LISTRIK
1 Amatur
- Lampu Hemat Energi 23 Watt 16.00 Bh Taksir 150,000.00
- Lampu Hemat Energi 18 Watt 3.00 Bh Taksir 120,000.00
Instalasi titik penerangan, instalasi termasuk kabelnya 2,5
2 19.00 Ttk Taksir 100,000.00
mm dlm pipa PVC fitting lampu dan kelengkapan instalasi
Instalasi titik kontak, instalasi termasuk kabelnya 2,5 mm dlm
3 12.00 Ttk Taksir 100,000.00
pipa conduit PVC Dan kelengkapan instalasi terpasang
4 Saklar
- Saklar 1 gang merk setara BROCO 4.00 Bh Taksir 100,000.00
- Saklar 2 gang merk setara BROCO 2.00 Bh Taksir 100,000.00
- Stop Kontak Setara BROCO 12.00 Bh Taksir 150,000.00
5 Box zekering MCB lengkap 1.00 Unit Taksir 300,000.00
6 Pemasukan Arus 6 Ampere dari PLN 1.00 Pkt Taksir 4,000,000.00
JUMLAH
Div. C8 PEK. INSTALASI AIR BERSIH & AIR KOTOR
1 Instalasi Pipa PVC Ø 3/4 dan 2 Inchi type AW 1.00 Pkt Taksir 3,000,000.00
2 Pengadaan & Pemasangan Wastapel + Acsesories 2.00 Unit A. 5.1.1.5 2,251,260.00
JUMLAH
HARGA
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA SATUAN
(Rp.)
1 2 3.00 4 5 6

Div. C9 PEK. PENGECATAN


1 Cat Kosen Pintu dan Jendela 29.44 M2 A. 4.7.1.4 32,417.00
2 Cat Dinding 545.83 M2 A. 4.7.1.10 26,301.00
3 Cat Plafond 277.45 M2 A. 4.7.1.10 26,301.00
4 Cat Listplank 12.76 M2 A. 4.7.1.4 32,417.00
JUMLAH
Div. D LANTAI 2
Div. D1 PEK. STRUKTUR BANGUNAN ATAS
Struktur Utama
1 Kolom beton K1 uk. 35x35 cm 11.17 M3 Supl. Kl.1 #NAME?
2 Kolom beton K2 uk. 30x30 cm 2.39 M3 Supl. Kl.2 #NAME?
3 Ring Balok RB1. uk. 20x30 cm 6.59 M3 Supl. RB.1 #NAME?
4 Balok latai uk. 13x15 cm 2.01 M3 Supl. BL.5 #NAME?
5 Balok Top gevel/Tombak Layar uk. 13x15 cm 0.59 M3 Supl. BL.5 #NAME?
6 Plat Kanopy Teras beton t : 10 cm 0.69 M3 Supl. PB.2 #NAME?
JUMLAH
Div. D2 PEK. PASANGAN DINDING
1 Pasangan Bata 1 : 4 284.99 M2 A. 4.4.1.9 111,468.50
2 Plesteran Bata 1 : 4 569.98 M2 A. 4.4.2.4 53,519.40
JUMLAH
Div. D3 PEK. PENUTUP LANTAI
1 Pas. Keramik lantai ruangan uk. 40x40 cm Polished 162.82 M2 A. 4.4.3.9a 210,982.75
2 Pas. Keramik lantai Teras uk. 40x40 cm Polished 49.67 M2 A. 4.4.3.9a 210,982.75
3 Pas. Keramik lantai Tangga uk. 40x40 cm Polished 7.34 M2 A. 4.4.3.9a 210,982.75
4 Pas. Glass Block ruang tangga 1.76 M2 Taksir 500,000.00
JUMLAH
Div. D4 PEK. KUSEN PINTU & JENDELA
Spesifikasi Daun pintu rangka kayu klas I panel blockbot t :
18 mm & jendela rangka alumunium lama dan pemasangan
kaca t : 5 mm, terpasang dengan acsesories antara lain :
kunci 2 slaag, engsel, grendel, hak angin, kaca rayben 5 mm
biaya sudah termasuk pemasangan
1 Kosen Kayu Ventilasi Tombak layar 0.21 M' A. 4.6.1.1 7,133,225.00
2 Perakitran Kembali & Pemasangan Kosen Alumunium 109.20 M' Taksir 100,000.00
Daun Pintu Buka dua Rangka kayu Klas I, Panel Blockboot t :
3 2.00 Unit Taksir 1,700,000.00
18 cm type P1+ Aksesoris terpasang

Daun Pintu Buka satu Rangka kayu kla I, Panel Blockboot t :


4 Unit Taksir 1,700,000.00
18 cm Type P2 + Aksesoris terpasang
Perakitan kembali & Pemasangan Daun Jendela Type J1 +
5 14.00 Bh Taksir 100,000.00
Aksesoris terpasang
6 Ventilasi Kaca Silang t : 5 mm 15.14 M2 A. 4.6.2.17 92,542.80
JUMLAH
Div. D5 PEK. PENUTUP ATAP
Spesifikasi material ranka baja ringan, menggunkan bahan
hasil bongkaran bangunan lama pembiayaan meliputi biaya
pemasangan/perakitan kembali.
1 Rangka Kuda-kuda Baja Ringan Smartruss 360.84 M2 A. 4.2.1.2a 108,955.00
2 Atap Seng Spandex 0,35 mm 360.84 M2 A. 4.5.2.32 92,290.00
3 Rabung Seng Spandex 0,35 mm 29.00 M' A. 4.5.2.36 100,012.00
4 Talang Patahan Atap M'
5 Papan Lisplank Kayu Klas II 82.80 M' A. 4.6.1.22 53,229.00
JUMLAH
Div. D6 PEK. PLAFOND
1 Pemasangan Rangka Plafond 304.24 M2 A. 4.6.1.20 85,789.00
2 Pemasangan Plafond Multyplek T = 4 mm 304.24 M2 A. 4.5.1.5 48,532.00
3 List Profil Plafond 152.22 M' A. 4.5.1.9 14,432.00
JUMLAH
Div. D7 PEK. INSTALASI LISTRIK
1 Amatur
- Lampu Hemat Energi 23 Watt 16.00 Bh Taksir 150,000.00
- Lampu Hemat Energi 18 Watt 4.00 Bh Taksir 120,000.00
Instalasi titik penerangan, instalasi termasuk kabelnya 2,5
2 20.00 Ttk Taksir 100,000.00
mm dlm pipa PVC fitting lampu dan kelengkapan instalasi

Instalasi titik kontak, instalasi termasuk kabelnya 2,5 mm dlm


3 9.00 Ttk Taksir 100,000.00
pipa conduit PVC Dan kelengkapan instalasi terpasang
HARGA
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA SATUAN
(Rp.)
1 2 3.00 4 5 6

4 Saklar
- Saklar 1 gang merk setara BROCO 1.00 Bh Taksir 100,000.00
- Saklar 2 gang merk setara BROCO 2.00 Bh Taksir 100,000.00
- Stop Kontak Setara BROCO 9.00 Bh Taksir 150,000.00
5 Box zekering MCB lengkap 1.00 Unit Taksir 300,000.00
JUMLAH
Div. D8 PEK. PENGECATAN
1 Cat Kosen Pintu dan Jendela 18.43 M2 A. 4.7.1.4 32,417.00
2 Cat Dinding 569.98 M2 A. 4.7.1.10 26,301.00
3 Cat Plafond 304.24 M2 A. 4.7.1.10 26,301.00
4 Cat Listplank 36.43 M2 A. 4.7.1.4 32,417.00
JUMLAH
Div. E PEK. LAIN-LAIN
1 Expose dan relief Kolom teras 10.00 Unit Taksir 900,000.00
2 Realif Dinding Atas Teras Lantai I 16.76 M' Taksir 400,000.00
3 Realing Tangga & Selasar LT. 2 Pipa galvanis Ø 2 Inchi & Cat 37.10 M' Taksir 200,000.00
4 Timbunan tanah humus pada pas bungga teras depan 2.30 M3 Taksir 1,000,000.00
5 Pengadaan bunga 1.00 Pkt Taksir 2,000,000.00
6 Pembersihan Akhir 1.00 Pkt Ls 500,000.00
7 Besi Hendrail Ram, Besi Steanlis Stell Ø 2 dan 1 Inchi 12.30 M' Taksir 150,000.00

JUMLAH
JUMLAH
HARGA
(Rp.)
7

1,000,000.00
1,000,000.00
1,000,000.00
2,000,000.00
500,000.00
5,500,000.00

18,627,755.19
1,493,529.84
401,151.30
-
4,806,559.81
118,725,246.00
84,842,639.50
28,806,717.33
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

5,264,726.94
422,284.94
577,533.00
2,309,461.11
31,201,077.60

401,546.97
32,267.62
134,237.40
1,620,925.63
2,213,190.98
2,139,525.48
#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
6,182,247.48
2,157,692.85

#NAME?
#NAME?
#NAME?
JUMLAH
HARGA
(Rp.)
7

#NAME?
JUMLAH
HARGA
(Rp.)
7

3,865,771.91
26,886,202.20
3,737,100.68
25,817,223.37
60,306,298.16

12,452,126.50
3,875,714.70
11,739,998.92
37,953,686.90
13,038,733.95
3,677,429.33
1,512,500.00
84,250,190.30

2,068,635.25
12,380,000.00

3,400,000.00

5,100,000.00

1,400,000.00

1,675,950.11
26,024,585.36

836,528.00
1,338,467.35
2,491,830.00
2,700,324.00
1,543,641.00
8,910,790.35

19,015,131.85
10,757,117.80
1,879,768.00
31,652,017.65

2,400,000.00
360,000.00

1,900,000.00

1,200,000.00

400,000.00
200,000.00
1,800,000.00
300,000.00
4,000,000.00
12,560,000.00

3,000,000.00
4,502,520.00
7,502,520.00
JUMLAH
HARGA
(Rp.)
7

954,356.48
14,355,874.83
7,297,212.45
413,640.92
23,021,084.68

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

31,767,407.82
30,504,987.61
62,272,395.43

34,352,211.36
10,479,513.19
1,548,613.39
880,000.00
47,260,337.93

1,497,977.25
10,920,000.00

3,400,000.00

1,400,000.00

1,401,097.99
18,619,075.24

39,315,322.20
33,301,923.60
2,900,348.00
-
4,407,361.20
79,924,955.00

26,100,445.36
14,765,375.68
2,196,839.04
43,062,660.08

2,400,000.00
480,000.00

2,000,000.00

900,000.00
JUMLAH
HARGA
(Rp.)
7

100,000.00
200,000.00
1,350,000.00
300,000.00
7,730,000.00

597,445.31
14,991,043.98
8,001,816.24
1,180,951.31
24,771,256.84

9,000,000.00
6,704,000.00
7,420,000.00
2,300,000.00
2,000,000.00
500,000.00
1,845,000.00

29,769,000.00
REKAPITULASI HARGA
INSTANSI : DINAS PENDIDIKAN DAN KEBUDAYAAN KOTA BANDA ACEH
PEKERJAAN : PEMBANGUNAN RKB SMPN 2 KOTA BANDA ACEH
LOKASI : KOTA BANDA ACEH

NO URAIAN PEKERJAAN JUMLAH HARGA


(RP)
A PEKERJAAN PERSIAPAN Rp 12,500,000.00
SUB. JUMLAH A Rp 12,500,000.00
B PEMBANGUNAN GEDUNG LANTAI - I
I PEKERJAAN TANAH DAN PONDASI Rp 414,914,003.47
II PEKERJAAN BETON BERTULANG Rp 566,869,820.00
III PEKERJAAN STRUKTUR TANGGA Rp 38,581,697.51
IV PEKERJAAN PASANGAN DAN PLESTERAN Rp 84,276,938.41
V PEKERJAAN TANAH DAN LANTAI Rp 90,947,796.28
VI PEK. PASANGAN KUSEN PINTU DAN JENDELA Rp 19,200,000.00
VII PEKERJAAN RANGKA DAN PENUTUP ATAP KANOPI Rp 10,032,242.00
VIII PEKERJAAN INSTALASI LISTRIK Rp 8,200,000.00
IX PEKERJAAN PENGECATAN Rp 30,803,116.63
SUB. JUMLAH B Rp 1,263,825,614.30
C PEMBANGUNAN GEDUNG LANTAI - II
I PEKERJAAN BETON BERTULANG Rp 468,381,359.00
II PEKERJAAN STRUKTUR TANGGA Rp 36,611,131.51
III PEKERJAAN PASANGAN DAN PLESTERAN Rp 82,512,117.11
IV PEKERJAAN LANTAI Rp 54,424,177.31
V PEK. PASANGAN KUSEN PINTU DAN JENDELA Rp 20,460,000.00
VI PEKERJAAN RANGKA DAN PENUTUP ATAP KANOPI Rp 10,032,242.00
VII PEKERJAAN INSTALASI LISTRIK Rp 8,200,000.00
VIII PEKERJAAN PENGECATAN Rp 31,295,997.37
SUB. JUMLAH C Rp 711,917,024.29
D PEMBANGUNAN GEDUNG LANTAI - III
I PEKERJAAN BETON BERTULANG Rp 208,148,212.00
II PEKERJAAN PASANGAN DAN PLESTERAN Rp 73,769,767.85
III PEKERJAAN LANTAI Rp 54,485,307.33
IV PEK. PASANGAN KUSEN PINTU DAN JENDELA Rp 23,675,000.00
V PEKERJAAN RANGKA DAN PENUTUP ATAP KANOPI Rp 121,314,424.40
VI PEKERJAAN LANGIT-LANGIT Rp 144,200,000.00
VII PEKERJAAN INSTALASI LISTRIK Rp 7,850,000.00
VIII PEKERJAAN PENGECATAN Rp 20,088,637.25
IX PEKERJAAN LAIN-LAIN Rp 3,000,000.00
SUB. JUMLAH D Rp 656,531,348.83
E PEMBANGUNAN KM/WC
A. PEMBANGUNAN GEDUNG LANTAI - I
I PEKERJAAN TANAH DAN PONDASI Rp 37,103,406.54
II PEKERJAAN PASANGAN DAN PLESTERAN Rp 23,062,824.55
III PEKERJAAN TANAH DAN LANTAI Rp 29,770,322.18
IV PEKERJAAN LANGIT-LANGIT Rp 17,146,500.00
V PEKERJAAN SANITASI AIR Rp 5,000,000.00
B. PEMBANGUNAN GEDUNG LANTAI - II
I PEKERJAAN PASANGAN DAN PLESTERAN Rp 61,035,776.51
II PEK. PASANGAN PINTU Rp 11,700,000.00
III PEKERJAAN LANGIT-LANGIT Rp 16,884,000.00
C. PEMBANGUNAN GEDUNG LANTAI - III
I PEKERJAAN PASANGAN DAN PLESTERAN Rp 60,368,382.53
II PEK. PASANGAN PINTU Rp 11,700,000.00
III PEKERJAAN LAIN-LAIN Rp 500,000.00
SUB. JUMLAH E Rp 274,271,212.31
JUMLAH (A + B + C + D + E) Rp 2,919,045,199.72
PPN 10% Rp 291,904,519.97
JUMLAH TOTAL Rp 3,210,949,719.69
DIBULATKAN Rp 3,210,940,000.00

Terbilang : Tiga Milyar Dua Ratus Sepuluh Juta Sembilan Ratus Empat Puluh Ribu Rupiah

Banda Aceh, 25 April 2017


PT. JEUMPA INDAH ABADI

NIZAM ELZA RIANDA


Direktur Utama
RENCANA ANGGARAN BIAYA
DINAS :
PEKERJAAN :
LOKASI :

JUMLAH HARGA
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT ANALISA
(Rp.)
(Rp.)
1 3 4 5 6,00 7=3x6
A PEKERJAAN PERSIAPAN
1.1 Pembongkaran Bangunan Lama 1,00 Ls Taksir 5,000,000.00 5,000,000.00
1.2 Administrasi dan Dokumentasi 1,00 Unit Taksir 2,000,000.00 #VALUE!
1.3 Papan Nama Proyek 1,00 Unit Taksir 500,000.00 #VALUE!
1.4 Direksikeet/Sewa 1,00 Unit Taksir 3,000,000.00 #VALUE!
1.5 Mutual Uji Mutu Beton 1,00 Ls Taksir 1,000,000.00 #VALUE!
1.6 Pengukuran dan Pemasangan Bowplank 1,00 Ls Taksir 1,000,000.00 #VALUE!
Sub Jumlah 12,500,000.00
B. PEMBANGUNAN GEDUNG LANTAI - I
I PEKERJAAN TANAH DAN PONDASI
Bangunan Utama
a. Pondasi Type I
1.1 Galian Tanah Pondasi Tapak dan Sumuran 225,28 m3 A.2.3.1.3 87,483.00 19,708,170.24
1.2 Urugan Tanah Kembali 56,32 m3 A.2.3.1.9 20,042.00 #VALUE!
1.3 Pasir Urug 2,82 m3 A.2.3.1.11 156,090.00 #VALUE!
1.4 Pas. Lantai Kerja 5,63 m3 A.4.1.1.4 825,531.67 #VALUE!
1.5 Beton Cor K-250 Pengisi Pondasi Sumuran TP1 37,43 m3 A.3.2.1.10 3,336,320.86 #VALUE!
1.6 Pondasi Tapak 140 x 140 cm' 10,78 m3 Suplemen 1.a 5,028,600.00 #VALUE!
1.7 Stik Kolom Pedestal 40/40 cm' 2,99 m3 Suplemen 3.a 6,544,400.00 #VALUE!
b. Pondasi Type II
1.1 Galian Tanah Pondasi Tapak dan Sumuran 29,40 m3 A.2.3.1.3 87,483.00 #VALUE!
1.2 Urugan Tanah Kembali 7,35 m3 A.2.3.1.9 20,042.00 #VALUE!
1.3 Pasir Urug 0,49 m3 A.2.3.1.11 156,090.00 #VALUE!
1.4 Pas. Lantai Kerja 0,98 m3 A.4.1.1.4 825,531.67 #VALUE!
1.5 Beton Cor K-250 Pengisi Pondasi Sumuran TP2 5,67 m3 A.3.2.1.10 3,336,320.86 #VALUE!
1.6 Pondasi Tapak 120 x 120 cm' 1,80 m3 Suplemen 1.b 5,121,500.00 #VALUE!
1.7 Stik Kolom Pedestal 30/40 cm 0,51 m3 Suplemen 3.b 6,801,400.00 #VALUE!
c. Pondasi Menerus
1.1 Galian Tanah Pondasi 53,87 m3 A.2.3.1.1 60,225.00 #VALUE!
1.2 Urugan Tanah Kembali 13,47 m3 A.2.3.1.9 20,042.00 #VALUE!
1.3 Pas. Pasir Alas 3,85 m3 A.2.3.1.11 156,090.00 #VALUE!
1.4 Pas Batu Aanstamping 7,70 m3 A.3.2.1.2.A 299,541.00 #VALUE!
1.5 Pas. Batu Gunung 1 : 4 31,42 m3 A.3.2.1.2 661,320.00 #VALUE!
d. Pondasi Balok Gantung
1.1 Pasir Urug 0,67 m3 A.2.3.1.11 156,090.00 #VALUE!
1.2 Pas Batu Aanstamping 1,33 m3 A.3.2.1.2.A 299,541.00 #VALUE!
Selasar
a. Pondasi Type II
1.1 Galian Tanah Pondasi Tapak dan Sumuran 64,68 m3 A.2.3.1.3 87,483.00 #VALUE!
1.2 Urugan Tanah Kembali 16,17 m3 A.2.3.1.9 20,042.00 #VALUE!
1.3 Pasir Urug 1,08 m3 A.2.3.1.11 156,090.00 #VALUE!
1.4 Pas. Lantai Kerja 2,16 m3 A.4.1.1.4 825,531.67 #VALUE!
1.5 Beton Cor K-250 Pengisi Pondasi Sumuran TP2 12,48 m3 A.3.2.1.10 3,336,320.86 #VALUE!
1.6 Pondasi Tapak 120 x 120 cm' 3,96 m3 Suplemen 1.b 5,121,500.00 #VALUE!
1.7 Stik Kolom Pedestal 30/40 cm 1,12 m3 Suplemen 3.b 6,801,400.00 #VALUE!
b. Pondasi Menerus
1.1 Galian Tanah Pondasi 17,36 m3 A.2.3.1.1 60,225.00 #VALUE!
1.2 Urugan Tanah Kembali 4,34 m3 A.2.3.1.9 20,042.00 #VALUE!
1.3 Pas. Pasir Alas 1,24 m3 A.2.3.1.11 156,090.00 #VALUE!
1.4 Pas Batu Aanstamping 2,48 m3 A.3.2.1.2.A 299,541.00 #VALUE!
1.5 Pas. Batu Gunung 1 : 4 10,36 m3 A.3.2.1.2 661,320.00 #VALUE!
JUMLAH HARGA
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT ANALISA
(Rp.)
(Rp.)
1 3 4 5 6,00 7=3x6
Raam & Trap Tangga, Selasar
a. Raam
1.1 Galian Tanah Pondasi 1,14 m3 A.2.3.1.1 60,225.00 68,656.50
1.2 Urugan Tanah Kembali 0,29 m3 A.2.3.1.9 20,042.00 #VALUE!
1.3 Beton Cor Pondasi Umpak 30 x 30 cm' 0,11 m3 A.4.1.1.4 825,531.67 #VALUE!
1.4 Kolom Praktis 13/13 cm 0,05 m3 Suplemen 3.d 7,940,000.00 #VALUE!
1.5 Pas. Lantai Kerja 0,29 m3 A.4.1.1.4 825,531.67 #VALUE!
1.6 Pasir Urug 0,14 m3 A.2.3.1.11 156,090.00 #VALUE!
1.7 Pas. Trasram Batu Bata 1 : 2 ( dinding) 8,40 m2 A.4.4.1.7 121,871.75 #VALUE!
1.8 Plesteran 1 : 2 16,80 m2 A.4.4.2.2 58,907.64 #VALUE!
1.9 Timbunan Tanah Bawah Lantai 5,85 m3 A.2.3.1.14.a 100,925.00 #VALUE!
1.10 Urugan Pasir Bawah Lantai T = 10 cm' 0,98 m3 A.2.3.1.11 156,090.00 #VALUE!
1.11 Beton Cor T = 5 cm' 0,49 m3 A.4.1.1.4 825,531.67 #VALUE!
1.12 Reilling Pipa Galvanis  2 1 2 "  terpasang 8,00 m' Taksir 400,000.00 #VALUE!
(bentuk dan ukuran sesuai gambar )
1.13 Rilief Nad Tali Air (bentuk sesuai gambar) 1,00 Ls Taksir 400,000.00 #VALUE!
b. Trap Tangga
1.1 Galian Tanah Pondasi 2,19 m3 A.2.3.1.1 60,225.00 #VALUE!
1.2 Urugan Tanah Kembali 0,55 m3 A.2.3.1.9 20,042.00 #VALUE!
1.3 Pas. Lantai Kerja 0,63 m3 A.4.1.1.4 825,531.67 #VALUE!
1.4 Pasir Urug 0,31 m3 A.2.3.1.11 156,090.00 #VALUE!
1.5 Pas. Trasram Batu Bata 1 : 2 ( dinding) 5,00 m2 A.4.4.1.7 121,871.75 #VALUE!
1.6 Plesteran 1 : 2 10,00 m2 A.4.4.2.2 58,907.64 #VALUE!
1.7 Timbunan Tanah Bawah Lantai 1,53 m3 A.2.3.1.14.a 100,925.00 #VALUE!
1.8 Urugan Pasir Bawah Lantai T = 10 cm' 0,30 m3 A.2.3.1.11 156,090.00 #VALUE!
1.9 Beton Cor T = 5 cm' 0,30 m3 A.4.1.1.4 825,531.67 #VALUE!
1.10 Acian Lantai 10,00 m2 A.4.4.2.27 32,216.25 #VALUE!
c. Selasar Depan, Belakang dan Samping
1.1 Galian Tanah Pondasi 19,98 m3 A.2.3.1.1 60,225.00 #VALUE!
1.2 Urugan Tanah Kembali 5,00 m3 A.2.31.9 20,042.00 #VALUE!
1.3 Pas. Lantai Kerja 4,44 m3 A.4.1.1.4 825,531.67 #VALUE!
1.4 Pasir Urug 2,22 m3 A.2.3.1.11 156,090.00 #VALUE!
1.5 Pas. Trasram Batu Bata 1 : 2 (dinding) 74,00 m2 A.4.4.1.7 121,871.75 #VALUE!
1.6 Plesteran 1 : 2 148,00 m2 A.4.4.2.2 58,907.64 #VALUE!
1.7 Timbunan Tanah Bawah Lantai 11,10 m3 A.2.3.1.14.a 100,925.00 #VALUE!
1.8 Urugan Pasir Bawah Lantai T = 10 cm' 7,40 m3 A.2.3.1.11 156,090.00 #VALUE!
1.9 Beton Cor T = 5 cm' 3,70 m3 A.4.1.1.4 825,531.67 #VALUE!
1.10 Acian Lantai 74,00 m2 A.4.4.2.27 32,216.25 #VALUE!

Sub Jumlah 414,914,003.47


II PEKERJAAN BETON BERTULANG
a. Bangunan Utama
2.1 Sloof 25/40 cm' (SL1) 10,58 m3 Suplemen 2.a 5,185,700.00 54,864,706.00
2.2 Kolom K1 40/40 cm' 16,19 m3 Suplemen 3.a 6,544,400.00 #VALUE!
2.3 Kolom K3 30/30 cm' 2,07 m3 Suplemen 3.c 7,963,900.00 #VALUE!
2.4 Balok Lantai 30/60 cm' (B1) 6,80 m3 Suplemen 4.a 5,587,300.00 #VALUE!
2.5 Balok Lantai 30/50 cm' (B2) 4,73 m3 Suplemen 4.b 5,729,800.00 #VALUE!
2.6 Balok Lantai 25/40 cm' (B3) 8,22 m3 Suplemen 4.c 6,354,800.00 #VALUE!
2.7 Balok Pinggang 13/15 cm' (Elv.+1.75) 0,61 m3 Suplemen 4.d 7,549,200.00 #VALUE!
2.8 Balok Lantai 13/15 cm' atas kusen (Elv.+2.75) 0,91 m3 Suplemen 4.d 7,549,200.00 #VALUE!
2.9 Pengecoran Plat Lantai T = 12 cm' Beton K250 19,95 m3 Suplemen 6.a 5,609,500.00 #VALUE!
b. Selasar
2.1 Sloof 25/40 cm' (SL) 4,15 m3 Suplemen 2.a 5,185,700.00 #VALUE!
2.2 Kolom K2 30/40 cm' 6,07 m3 Suplemen 3.b 6,801,400.00 #VALUE!
2.3 Balok Lantai 25/40 cm' (B3) 4,96 m3 Suplemen 4.c 6,354,800.00 #VALUE!
2.4 Balok pet 15/20 cm' (Elv.+2.75) 0,89 m3 Suplemen 4.e 7,412,000.00 #VALUE!
2.5 Pengecoran Plat Pet T = 10 cm' (Elv.+2.75) 1,48 m3 Suplemen 6.b 5,860,800.00 #VALUE!
2.6 Pengecoran Plat Lantai T = 12 cm' Beton K250 6,35 m3 Suplemen 6.a 5,609,500.00 #VALUE!
2.7 Bangku Plat Beton T = 10 cm' Beton K225 ( Elv.+0,50) 0,62 m3 Suplemen 6.b 5,860,800.00 #VALUE!

Sub Jumlah 566,869,820.00


JUMLAH HARGA
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT ANALISA
(Rp.)
(Rp.)
1 3 4 5 6,00 7=3x6
III. PEKERJAAN STRUKTUR TANGGA
3.1 Sloof 25/40 cm' (SL) 0,38 m3 Suplemen 2.a 5,185,700.00 1,970,566.00
3.2 Kolom Praktis 13/13 cm' 0,06 m3 Suplemen 3.d 7,940,000.00 #VALUE!
3.3 Balok Bordes 20/30 cm' (El.+2.23) 0,83 m3 Suplemen 4.f 7,775,200.00 #VALUE!
3.4 Pengecoran Anak Tangga 1,04 m3 Suplemen 6.c 6,806,300.00 #VALUE!
3.5 Pengecoran Plat Tangga 1,40 m3 Suplemen 6.d 5,538,400.00 #VALUE!
3.6 Pengecoran Plat Bordes 0,82 m3 Suplemen 6.d 5,538,400.00 #VALUE!
3.7 Balok Reilling 13/15 cm' 0,16 m3 Suplemen 4.d 7,549,200.00 #VALUE!
3.8 Pas. Batu Bata 1 : 4 7,47 m2 A.4.4.1.9 111,468.50 #VALUE!
3.9 Plesteran Batu Bata 1 : 4 14,94 m2 A.4.4.2.4 53,519.40 #VALUE!
3.10 Keramik Lantai 30 x 30 cm Unpholised 26,83 m2 A.4.4.3.35a 186,634.14 #VALUE!
3.11 Besi Pipa Handle Relling Tangga  2 1 2 " 8,30 m' Taksir 200,000.00 #VALUE!
3.12 Pembuatan Lubang pada Dinding Reilling Tangga 1,00 Ls Taksir 800,000.00 #VALUE!

Sub Jumlah 38,581,697.51


IV. PEKERJAAN PASANGAN DAN PLESTERAN
4.1 Pas. Batu Bata 1 : 2 (dibawah lantai) 24,45 m2 A.4.4.1.7 121,871.75 2,979,764.29
4.2 Pas. Batu Bata 1 : 2 (diatas lantai 20 cm) 15,12 m2 A.4.4.1.7 121,871.75 #VALUE!
4.3 Pas. Batu Bata 1 : 4 216,99 m2 A.4.4.1.9 111,468.50 #VALUE!
4.4 Pas. Batu Bata 1 : 4 (Selasar) 30,34 m2 A.4.4.1.9 111,468.50 #VALUE!
4.5 Plesteran 1 : 2 79,14 m2 A.4.4.2.2 58,907.64 #VALUE!
4.6 Plesteran Batu Bata 1 : 4 494,66 m2 A.4.4.2.4 53,519.40 #VALUE!
4.7 Plesteran Acian Kolom/Balok 278,67 m2 A.4.4.2.27 32,216.25 #VALUE!
4.8 Pek. Pasangan Batu Alam pada Tiang Teras 42,57 m2 A.4.4.3.58 238,933.75 #VALUE!
4.9 Pembuatan Lubang pada Dinding Atas Selasar 1,00 Ls Taksir 800,000.00 #VALUE!
4.10 Pembentukan Lubang Dinding Beton Dudukan Kusen 1,00 Ls Taksir 800,000.00 #VALUE!
Sub Jumlah 84,276,938.41
V. PEKERJAAN TANAH DAN LANTAI
a. Lantai Ruangan Elv. 0+0.00
5.1 Timbunan Tanah Bawah Lantai 113,40 m3 A.2.3.1.14.a 100,925.00 11,444,895.00
5.2 Urugan Pasir Bawah Lantai T = 10 cm' 18,90 m3 A.2.3.1.11 156,090.00 #VALUE!
5.3 Beton Cor T = 5 cm' 9,45 m3 A.4.1.1.4 825,531.67 #VALUE!
5.4 Lantai Keramik 40 x 40 cm' pholised 181,87 m2 A.4.4.3.34 210,982.75 #VALUE!
b. Lantai Selasar Elv. 0-0.05
5.1 Timbunan Tanah Bawah Lantai 49,50 m3 A.2.3.1.14.a 100,925.00 #VALUE!
5.2 Urugan Pasir Bawah Lantai T = 10 cm' 9,00 m3 A.2.3.1.11 156,090.00 #VALUE!
5.3 Beton Cor T = 5 cm' 4,50 m3 A.4.1.1.4 825,531.67 #VALUE!
5.4 Lantai Keramik 40 x 40 cm' unpholised 99,45 m2 A.4.4.3.34a 203,766.75 #VALUE!
Sub Jumlah 90,947,796.28
VI. PEK. PASANGAN KUSEN PINTU DAN JENDELA
6.1 Pintu Type P1 = 3 unit
- Pintu UPVC + Panel UPVC + Kusen UPVC + Engsel UPVC
Termasuk Kunci Tanam 2 Slaag & Aksesories lainnya 3,00 bh Taksir 1,500,000.00 4,500,000.00
(terpasang)
- Ventilasi UPVC Type Swing + Kaca 5 mm + Kusen UPVC +
Engsel UPVC Termasuk Kunci Pacok & Aksesories lainnya 6,00 bh Taksir 1,200,000.00 #VALUE!
(terpasang)
6.2 Jendela Type J1 = 15 unit
- Jendela & Ventilasi UPVC Type Swing + Kaca 5 mm + Kusen
UPVC + Engsel UPVC Termasuk Kunci Pacok & Aksesories 15,00 bh Taksir 500,000.00 #VALUE!
lainnya (terpasang)

Sub Jumlah 19,200,000.00


VII. PEKERJAAN RANGKA DAN PENUTUP ATAP KANOPI
7.1 Kayu Kuda 5/10 cm & Gording 5/7 cm ( diketam halus empat
sisi) 0,61 m3 A.4.6.1.13 5,975,200.00 3,644,872.00

7.2 Lesplang Reuter Papan 2,5/25 cm 34,00 m' A.4.6.1.21 53,229.00 #VALUE!
7.3 Penutup Atap Span Dek 0.30 setara ( Muliadek Type 700) 49,60 m2 A.4.5.2.32 92,290.00 #VALUE!

Sub Jumlah 10,032,242.00


JUMLAH HARGA
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT ANALISA
(Rp.)
(Rp.)
1 3 4 5 6,00 7=3x6
VIII. PEKERJAAN INSTALASI LISTRIK
8.1 Armatur
- Lampu HE 18 Watt 18,00 Bh Taksir 130,000.00 2,340,000.00
- Lampu HE 12 Watt 5,00 Bh Taksir 130,000.00 #VALUE!
8.2 Saklar Lampu Merk Broco 2 seri
- Saklar 2 Seri setara Broco 1,00 Bh Taksir 130,000.00 #VALUE!
- Saklar 3 Seri setara Broco 4,00 Bh Taksir 130,000.00 #VALUE!
8.3 Stop Kontak 7,00 Bh Taksir 180,000.00 #VALUE!
8.4 Instalasi titik penerangan, instalasi termasuk kabel
NYA 2,5 mm dalam pipa PVC fitting lampu dan
kelengkapan instalasi terpasang 23,00 Titik Taksir 100,000.00 #VALUE!
8.5 Instalasi titik stop kontak, instalasi termasuk kabel
NYA 2,5 mm dalam pipa PVC , kotak kontak dan
kelengkapan instalasi terpasang 7,00 Titik Taksir 100,000.00 #VALUE!
8.6 Box Panel MCB 1,00 Bh Taksir 300,000.00 #VALUE!

Sub Jumlah 8,200,000.00


IX. PEKERJAAN PENGECATAN
9.1 Cat Tembok (L/D) 867,41 m2 A.4.7.1.10 26,301.00 22,813,750.41
9.2 Cat Langit-langit Beton Ruangan dan Selasar 252,53 m2 A.4.7.1.10 26,301.00 #VALUE!
9.3 Cat Minyak Lisplank dan Kanopi 41,57 m2 A.4.7.1.4 32,417.00 #VALUE!

Sub Jumlah 30,803,116.63


C. PEMBANGUNAN GEDUNG LANTAI - II
I. PEKERJAAN BETON BERTULANG
a. Bangunan Utama
1.1 Kolom K1 40/40 cm' 14,08 m3 Suplemen 3.a 6,544,400.00 92,145,152.00
1.2 Kolom K3 30/30 cm' 1,80 m3 Suplemen 3.c 7,963,900.00 #VALUE!
1.3 Balok Lantai 25/60 cm' (B4) 5,67 m3 Suplemen 4.g 5,948,600.00 #VALUE!
1.4 Balok Lantai 25/45 cm' (B5) 3,54 m3 Suplemen 4.h 6,691,800.00 #VALUE!
1.5 Balok Lantai 25/40 cm' (B3) 8,22 m3 Suplemen 4.c 6,354,800.00 #VALUE!
1.6 Balok Pinggang 13/15 cm' (Elv.+5.80) 0,61 m3 Suplemen 4.d 7,549,200.00 #VALUE!
1.7 Balok Lantai 13/15 cm' atas kusen (Elv.+6.80) 0,91 m3 Suplemen 4.d 7,549,200.00 #VALUE!
1.8 Pengecoran Plat Lantai T = 12 cm' Beton K250 20,32 m3 Suplemen 6.a 5,609,500.00 #VALUE!
b. Selasar
1.1 Kolom K2 30/40 cm' 5,28 m3 Suplemen 3.b 6,801,400.00 #VALUE!
1.2 Balok Lantai 25/40 cm' (B3) 4,96 m3 Suplemen 4.c 6,354,800.00 #VALUE!
1.3 Balok Rielling Selasar 13/15 cm' ( Elv.+5.15) 0,64 m3 Suplemen 4.d 7,549,200.00 #VALUE!
1.4 Balok pet 15/20 cm' (B7) Elv.+6.8 0,89 m3 Suplemen 4.e 7,412,000.00 #VALUE!
1.5 Pengecoran Plat Lantai T = 10 cm' ( Elv.+6.80) 1,48 m3 Suplemen 6.b 5,860,800.00 #VALUE!
1.6 Pengecoran Plat Lantai T = 12 cm' Beton K250 6,35 m3 Suplemen 6.a 5,609,500.00 #VALUE!
1.7 Bangku Plat Beton T = 10 cm' Beton K225 ( Elv.+4,50) 0,62 m3 Suplemen 6.b 5,860,800.00 #VALUE!

Sub Jumlah 468,381,359.00


JUMLAH HARGA
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT ANALISA
(Rp.)
(Rp.)
1 3 4 5 6,00 7=3x6
II. PEKERJAAN STRUKTUR TANGGA
2.1 Kolom Praktis 13/13 cm' 0,06 m3 Suplemen 3.d 7,940,000.00 476,400.00
2.2 Balok Bordes 20/30 cm' (B6) El.+5.75 0,83 m3 Suplemen 4.f 7,775,200.00 #VALUE!
2.3 Pengecoran Anak Tangga 1,04 m3 Suplemen 6.c 6,806,300.00 #VALUE!
2.4 Pengecoran Plat Tangga 1,40 m3 Suplemen 6.d 5,538,400.00 #VALUE!
2.5 Pengecoran Plat Bordes 0,82 m3 Suplemen 6.d 5,538,400.00 #VALUE!
2.6 Balok Reilling 13/15 cm' 0,16 m3 Suplemen 4.d 7,549,200.00 #VALUE!
2.7 Pas. Batu Bata 1 : 4 7,47 m2 A.4.4.1.9 111,468.50 #VALUE!
2.8 Plesteran Batu Bata 1 : 4 14,94 m2 A.4.4.2.4 53,519.40 #VALUE!
2.9 Keramik Lantai 30 x 30 cm Unpholised 26,83 m2 A.4.4.3.35a 186,634.14 #VALUE!
2.10 Besi Pipa Handle Relling Tangga  2 1 2 " 8,30 m' Taksir 200,000.00 #VALUE!
2.11 Pembuatan Lubang pada Dinding Reilling Tangga 1,00 Ls Taksir 800,000.00 #VALUE!

Sub Jumlah 36,611,131.51


III. PEKERJAAN PASANGAN DAN PLESTERAN
3.1 Pas. Batu Bata 1 : 4 236,57 m2 A.4.4.1.9 111,468.50 26,370,103.05
3.2 Pas. Batu Bata 1 : 4 (Reilling Selasar) 30,02 m2 A.4.4.1.9 111,468.50 #VALUE!
3.3 Pas. Batu Bata 1 : 4 (Atas Selasar) 25,16 m2 A.4.4.1.9 111,468.50 #VALUE!
3.4 Plesteran Batu Bata 1 : 4 583,49 m2 A.4.4.2.4 53,519.40 #VALUE!
3.5 Plesteran Acian Kolom/Balok 302,74 m2 A.4.4.2.27 32,216.25 #VALUE!
3.6 Pembuatan Lubang pada Reilling Selasar 1,00 Ls Taksir 800,000.00 #VALUE!
3.7 Pembuatan Lubang pada Dinding Atas Selasar 1,00 Ls Taksir 800,000.00 #VALUE!
3.8 Besi Pipa Handle Reilling Selasar  2 1 2 " 33,05 m' Taksir 200,000.00 #VALUE!
3.9 Pembentukan Lubang Dinding Beton Dudukan Kusen 1,00 Ls Taksir 800,000.00 #VALUE!

Sub Jumlah 82,512,117.11


IV. PEKERJAAN LANTAI
a. Lantai Ruangan Elv. +4.05
4.1 Lantai Keramik 40 x 40 cm' Pholised 181,87 m2 A.4.4.3.34 210,982.75 38,371,432.74
b. Lantai Selasar Elv. +4.03
4.1 Lantai Keramik 40 x 40 cm' Unpholised 78,78 m2 A.4.4.3.34a 203,766.75 #VALUE!

Sub Jumlah 54,424,177.31


V. PEK. PASANGAN KUSEN PINTU DAN JENDELA
5.1 Pintu Type P1 = 3 unit
- Pintu UPVC + Panel UPVC + Kusen UPVC + Engsel UPVC 3,00 bh Taksir 1,500,000.00 4,500,000.00
Termasuk Kunci Tanam 2 Slaag & Aksesories lainnya
terpasang
(UPVC Type) Swing + Kaca 5 mm + Kusen UPVC + Engsel
- UPVC Termasuk Kunci Pacok & Aksesories lainnya 6,00 bh Taksir 1,200,000.00 #VALUE!
(terpasang)
5.2 Jendela Type J1 = 15 unit
- Jendela & Ventilasi UPVC Type Swing + Kaca 5 mm + Kusen 15,00 bh Taksir 500,000.00 #VALUE!
UPVC + Engsel UPVC Termasuk Kunci Pacok & Aksesories
lainnya (terpasang)
5.3 Batu Krawang
Batu Krawang Merah 5,04 m2 Taksir 250,000.00 #VALUE!

Sub Jumlah 20,460,000.00


VI. PEKERJAAN RANGKA DAN PENUTUP ATAP KANOPI
Kayu Kuda 5/10 cm & Gording 5/7 cm ( diketam halus empat 0,61 m3 A.4.6.1.13 5,975,200.00 3,644,872.00
6.1 sisi)
6.2 Lesplang Reuter Papan 2,5/25 cm 34,00 m' A.4.6.1.21 53,229.00 #VALUE!
6.3 Penutup Atap Span Dek 0.30 setara ( Muliadek Type 700) 49,60 m2 A.4.5.2.32 92,290.00 #VALUE!

Sub Jumlah 10,032,242.00


VII. PEKERJAAN INSTALASI LISTRIK
7.1 Armatur
- Lampu HE 18 Watt 18,00 bh Taksir 130,000.00 2,340,000.00
- Lampu HE 12 Watt 5,00 bh Taksir 130,000.00 650,000.00
JUMLAH HARGA
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT ANALISA
(Rp.)
(Rp.)
1 3 4 5 6,00 7=3x6
7.2 Saklar Lampu Merk Broco 2 seri
- Saklar 2 Seri setara Broco 1,00 Bh Taksir 130,000.00 130,000.00
- Saklar 3 Seri setara Broco 4,00 Bh Taksir 130,000.00 #VALUE!
7.3 Stop Kontak 7,00 Bh Taksir 180,000.00 #VALUE!
7.4 Instalasi titik penerangan, instalasi termasuk kabel
NYA 2,5 mm dalam pipa PVC fitting lampu dan
kelengkapan instalasi terpasang 23,00 Titik Taksir 100,000.00 #VALUE!
7.5 Instalasi titik stop kontak, instalasi termasuk kabel
NYA 2,5 mm dalam pipa PVC, kotak kontak dan
kelengkapan instalasi terpasang 7,00 Titik Taksir 100,000.00 #VALUE!
7.6 Box Panel MCB 1,00 Bh Taksir 300,000.00 #VALUE!

Sub Jumlah 8,200,000.00


VIII. PEKERJAAN PENGECATAN
8.1 Cat Tembok (L/D) 901,17 m2 A.4.7.1.10 26,301.00 23,701,672.17
8.2 Cat Langit-langit Beton Ruangan dan Selasar 237,51 m2 A.4.7.1.10 26,301.00 #VALUE!
8.3 Cat Minyak Lisplank dan Kanopi 41,57 m2 A.4.7.1.4 32,417.00 #VALUE!

Sub Jumlah 31,295,997.37


F. PEMBANGUNAN GEDUNG LANTAI - III
I. PEKERJAAN BETON BERTULANG
a. Bangunan Utama
1.1 Kolom K1 30/40 cm' 10,03 m3 Suplemen 3.b 6,801,400.00 68,218,042.00
1.2 Kolom K3 30/30 cm' 1,71 m3 Suplemen 3.c 7,963,900.00 #VALUE!
1.3 Kolom Tombak Layar 13/13 cm' 0,05 m3 Suplemen 3.d 7,940,000.00 #VALUE!
1.4 Ring Balok 25/35 cm' (RB1) Elv.+11.80 7,98 m3 Suplemen 5.a 6,213,000.00 #VALUE!
1.5 Balok Tombak Layar 15/20 cm' 1,06 m3 Suplemen 5.b 6,596,400.00 #VALUE!
1.6 Balok Lantai 13/15 cm' atas kusen (Elv.+10.60) 1,02 m3 Suplemen 4.d 7,549,200.00 #VALUE!
1.7 Balok Pinggang 13/15 cm' (Elv. +9.50) 0,61 m3 Suplemen 4.d 7,549,200.00 #VALUE!
b. Selasar
1.1 Kolom K3 30/30 cm' 3,17 m3 Suplemen 3.c 7,963,900.00 #VALUE!
1.2 Ring Balok 25/30 cm' (RB2) Elv.+11.00) 3,02 m3 Suplemen 5.c 6,307,500.00 #VALUE!
1.3 Balok Reilling Selasar 13/15 cm' ( Elv. +8/80) 0,64 m3 Suplemen 4.d 7,549,200.00 #VALUE!
1.4 Bangku Plat Beton T = 10 cm' Beton K225 (Elv.+8,30) 0,65 m3 Suplemen 6.b 5,860,800.00 #VALUE!
1.5 Pengecoran Plat Lantai T = 10 cm' ( Sambungan Akses Selasar ) 0,70 m3 Suplemen 6.b 5,860,800.00 #VALUE!

Sub Jumlah 208,148,212.00


II. PEKERJAAN PASANGAN DAN PLESTERAN
2.1 Pas. Batu Bata 1 : 4 234,81 m2 A.4.4.1.9 111,468.50 26,173,918.49
2.2 Pas. Batu Bata 1 : 4 (Tombak Layar) 27,50 m2 A.4.4.1.9 111,468.50 #VALUE!
2.3 Pas. Batu Bata 1 : 4 (Reilling Selayar ) 30,12 m2 A.4.4.1.9 111,468.50 #VALUE!
2.4 Plesteran Batu Bata 1 : 4 557,35 m2 A.4.4.2.4 53,519.40 #VALUE!
2.5 Plesteran Acian Kolom/Balok 97,28 m2 A.4.4.2.27 32,216.25 #VALUE!
2.6 Pembuatan Lubang pada Reilling Selasar 1,00 Ls Taksir 800,000.00 #VALUE!
2.7 Besi Pipa Handle Reilling Selasar  2 1 2 " 33,05 m' Taksir 200,000.00 #VALUE!
2.8 Pembentukan Lubang Dinding Beton Dudukan Kusen 1.00 Ls Taksir 800,000.00 800,000.00

Sub Jumlah 73,769,767.85


III. PEKERJAAN LANTAI
a. Lantai Ruangan Elv. +7.85
3.1 Lantai Keramik 40 x 40 cm' Pholised 181,87 m2 A.4.4.3.34 210,982.75 38,371,432.74
b. Lantai Selasar Elv. +7.83
3.1 Lantai Keramik 40 x 40 cm' Unpholised 79,08 m2 A.4.4.3.34a 203,766.75 #VALUE!

Sub Jumlah 54,485,307.33


IV. PEK. PASANGAN KUSEN PINTU DAN JENDELA
4.1 Pintu Type P1 = 3 unit
- Pintu UPVC + Panel UPVC + Kusen UPVC + Engsel UPVC 3,00 bh Taksir 1,500,000.00 4,500,000.00
Termasuk Kunci Tanam 2 Slaag & Aksesories lainnya
(terpasang)
JUMLAH HARGA
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT ANALISA
(Rp.)
(Rp.)
1 3 4 5 6,00 7=3x6
-
UPVC Type Swing + Kaca 5 mm + Kusen UPVC + Engsel
UPVC Termasuk Kunci Pacok & Aksesories lainnya 6,00 bh Taksir 1,200,000.00 7,200,000.00
(terpasang)
4.2 Jendela Type J1 = 15 unit
- Jendela & Ventilasi UPVC Type Swing + Kaca 5 mm + Kusen 15,00 bh Taksir 500,000.00 7,500,000.00
UPVC + Engsel UPVC Termasuk Kunci Pacok & Aksesories
lainnya (terpasang)
4.3 Ventilasi Type V1 = 4 unit
- Ventilasi UPVC Type Sisir + Kusen UPVC & Aksesories lainnya 4,00 bh Taksir 500,000.00 #VALUE!
(terpasang)
4.3 Batu Krawang
Batu Krawang Merah 9,90 m2 Taksir 250,000.00 #VALUE!

Sub Jumlah 23,675,000.00


V. PEKERJAAN RANGKA DAN PENUTUP ATAP KANOPI
5.1 Rangka Atap Baja Ringan Zincalume 494,32 m2 Taksir 130,000.00 64,261,600.00
5.2 Lesplang Reuter Papan, 2,5/25 cm 96,40 m' A.4.6.1.21 53,229.00 #VALUE!
5.3 Penutup Atap Spandek 0.30 setara (Muliadek Type 700) 494,32 m2 A.4.5.2.32 92,290.00 #VALUE!
5.4 Rabung Seng Genteng Metal 0.35 33,40 m' A.4.5.2.36 100,012.00 #VALUE!
5.5 Klem Lisplang/Nok Samping Seng Metal 0.35 29,60 m' A.4.5.2.36 100,012.00 #VALUE!
Sub Jumlah 121,314,424.40
VI. PEKERJAAN LANGIT-LANGIT
Plafond PVC t=6 mm pada Ruangan dan Selasar termasuk 273,92 m2 Taksir Rp 350,000.00 Rp 95,872,000.00
6.1 Rangka Furing + Penggantung (Terpasang)
Plafond Kalsiboard pada Tritisan termasuk Rangka Furing + 109,92 m2 Taksir Rp 350,000.00 #VALUE!
6.2
Penggantung (Terpasang)
6.3 List Profil PVC 140,80 m' Taksir Rp 70,000.00 Rp 9,856,000.00

Sub Jumlah Rp 144,200,000.00


VII. PEKERJAAN INSTALASI LISTRIK
7.1 Armatur
- Lampu HE 18 Watt 18,00 bh Taksir 130,000.00 2,340,000.00
- Lampu HE 12 Watt 5,00 bh Taksir 130,000.00 #VALUE!
7.2 Saklar Lampu Merk Broco 2 seri
- Saklar 2 seri setara Broco 1,00 Bh Taksir 130,000.00 #VALUE!
- Saklar 3 Seri setara Broco 4,00 Bh Taksir 130,000.00 #VALUE!
7.3 Stop Kontak 7,00 Bh Taksir 130,000.00 #VALUE!
7.4 Instalasi titik penerangan, instalasi termasuk kabel
NYA 2,5 mm dalam pipa PVC fitting lampu dan
kelengkapan instalasi terpasang 23,00 Titik Taksir 100,000.00 #VALUE!
7.5 Instalasi titik stop kontak, instalasi termasuk kabel
NYA 2,5 mm dalam pipa PVC , kotak kontak dan
kelengkapan instalasi terpasang 7,00 Titik Taksir 100,000.00 #VALUE!
7.6 Box Panel MCB 1,00 Bh Taksir 300,000.00 #VALUE!

Sub Jumlah 7,850,000.00


VIII. PEKERJAAN PENGECATAN
8.1 Cat Tembok (L/D) 654,63 m2 A.4.7.1.10 26,301.00 17,217,423.63
8.2 Cat Plafond Kalsiboard 109,92 m2 A.4.7.1.12 19,013.50 #VALUE!
8.3 Cat Minyak Lisplank Kayu 24,10 m2 A.4.7.1.4 32,417.00 #VALUE!

Sub Jumlah 20,088,637.25


IX. PEKERJAAN LAIN-LAIN
9.1 Plakat dari Batu Granit uk 40x60 cm 1,00 Unit Taksir 1,000,000.00 1,000,000.00
9.2 Pembobokan Dinding Lama (Selasar Jln Akses Lt.II dan Lt.III ) 1,00 Ls Taksir 2,000,000.00 2,000,000.00

Sub Jumlah 3,000,000.00


JUMLAH HARGA
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT ANALISA
(Rp.)
(Rp.)
1 3 4 5 6,00 7=3x6
E. LANJUTAN PEMBANGUNAN KM/WC
A. PEMBANGUNAN GEDUNG LANTAI I
I PEKERJAAN TANAH DAN PONDASI
Raam Dan Selasar
a. Raam
1.1 Galian Tanah Pondasi 1.14 m3 A.2.3.1.1 60,225.00 68,656.50
1.2 Urugan Tanah Kembali 0.29 m3 A.2.3.1.9 20,042.00 5,812.18
1.3 Beton Cor Pondasi Umpak 0.11 m3 A.4.1.1.4 825,531.67 90,808.48
1.4 Kolom Praktis 13/13 cm' 0.05 m3 Suplemen 3.d 7,940,000.00 397,000.00
1.5 Pas. Lantai Kerja 0.29 m3 A.4.1.1.4 825,531.67 239,404.18
1.6 Pasir Urug 0.14 m3 A.2.3.1.11 156,090.00 21,852.60
1.7 Pas. Trasram Batu Bata 1 : 2 (dinding) 8.40 m2 A.4.4.1.7 121,871.75 1,023,722.70
1.8 Plesteran 1 : 2 16.8 m2 A.4.4.2.2 58,907.64 989,648.35
1.9 Timbunan Tanah Bawah Lantai 5.85 m3 A.2.3.1.14.a 100,925.00 590,411.25
1.10 Urugan Pasir Bawah Lantai T = 10 cm' 0.98 m3 A.2.3.1.11 156,090.00 152,968.20
1.11 Beton Cor T = 5 cm' 0.49 m3 A.4.1.1.4 825,531.67 404,510.52
1.12 Reiling Pipa Galvanis + Terpasang 8.00 m' Taksir 400,000.00 3,200,000.00
1.13 Relief Nad Tali Air 1.00 Ls Taksir 400,000.00 400,000.00
b. Selasar depan, belakang dan samping
1.1 Galian Tanah Pondasi 19.17 m3 A.2.3.1.1 60,225.00 1,154,513.25
1.2 Urugan Tanah Kembali 4.79 m3 A.2.3.1.9 20,042.00 96,001.18
1.3 Pas. Lantai Kerja 4.26 m3 A.4.1.1.4 825,531.67 3,516,764.90
1.4 Pasir Urug 2.13 m3 A.2.3.1.11 156,090.00 332,471.70
1.5 Pas. Trasram Batu Bata 1 : 2 (dinding) 71.00 m2 A.4.4.1.7 121,871.75 8,652,894.25
1.6 Plesteran 1 : 2 142.00 m2 A.4.4.2.2 58,907.64 8,364,884.88
1.7 Timbunan Tanah Bawah Lantai 10.65 m3 A.2.3.1.14.a 100,925.00 1,074,851.25
1.8 Urugan Pasir Bawah Lantai T = 10 cm' 7.10 m3 A.2.3.1.11 156,090.00 1,108,239.00
1.9 Beton Cor T = 5 cm' 3.55 m3 A.4.1.1.4 825,531.67 2,930,637.42
1.10 Acian Lantai 71.00 m2 A.4.4.2.27 32,216.25 2,287,353.75
Sub Jumlah 37,103,406.54
II. PEKERJAAN PASANGAN DAN PLESTERAN
Bangunan Utama
1.1 Pek. Pasangan Batu alam pada tiang dan teras 38.7 m2 A.4.4.3.58 238,933.75 9,246,736.13
Tangga dan teras
2.1 Pek. Pasangan Batu alam pada tiang dan teras 15.48 m2 A.4.4.3.58 238,933.75 3,698,694.45
2.2 Keramik Lantai 30 x 30 cm Unpholised 26.83 m2 A.4.4.3.35a 186,634.14 5,007,393.98
2.3 Besi Pipa Handle Relling Tangga 8.30 m' Taksir 200,000.00 1,660,000.00
2.4 Louver Sunwearing 6.90 m' Taksir 500,000.00 3,450,000.00
Sub Jumlah 23,062,824.55
III. PEKERJAAN TANAH DAN LANTAI
Lantai selasar dan teras
3.1 Lantai Keramik 40 x 40 cm' unpholised 146.10 m2 A.4.4.3.34a 203,766.75 29,770,322.18
Sub Jumlah 29,770,322.18
IV. PEKERJAAN LANGIT-LANGIT
4.1 Plafond PVC t=6 mm pada Ruangan dan Selasar termasuk 39.75 m2 Taksir 350,000.00 13,912,500.00
Rangka Furing + Penggantung (Terpasang)
4.2 List Profil PVC 46.2 m' Taksir 70,000.00 3,234,000.00
Sub Jumlah 17,146,500.00
V. PEKERJAA SANITASI AIR
5.1 Septic Tank + resapan 1.00 Unit Taksir 3,000,000.00 3,000,000.00
5.2 Pipa Air Bersih 1.00 Ls Taksir 1,200,000.00 1,200,000.00
5.3 Bak Kontrol 4.00 Bh Taksir 200,000.00 800,000.00
Sub Jumlah 5,000,000.00
B. PEMBANGUNAN GEDUNG LANTAI II
I PEKERJAAN PASANGAN DAN PLESTERAN
a. Tangga dan KM/WC
1.1 Pembentukan permukaan dinding untuk dudukan pintu 9.00 Unit Taksir 300,000.00 2,700,000.00
1.2 Besi Pipa Handle Reilling Selasar 8.30 m' Taksir 200,000.00 1,660,000.00
1.3 Keramik Lantai 30 x 30 cm Unpholised 26.83 m' A.4.4.3.35a 186,634.14 5,007,393.98
1.4 Lantai Keramik 40 x 40 cm' Unpholised 18.90 m2 A.4.4.3.34a 203,766.75 3,851,191.58
1.5 Lantai Keramik 20 x 20 cm' Unpholised 35.42 m2 A.4.4.3.50 190,416.60 6,744,555.97
1.6 Dinding Keramik 20 x 25 cm' Polished 100.92 m2 A.4.4.3.51 232,190.20 23,432,634.98
1.7 Bak air Fiber 8.00 Bh Taksir 300,000.00 2,400,000.00
1.8 Kran Air 1/2 13.00 Bh Taksir 30,000.00 390,000.00
1.9 Floor Drain + acsesoris 10.00 Bh Taksir 30,000.00 300,000.00
1.10 Kloset Jongkok terpasang 8.00 Bh Taksir 1,100,000.00 8,800,000.00
1.11 Washtafel + Cer min + Acsesoris Terpasang 3.00 Bh Taksir 1,300,000.00 3,900,000.00
b. Pekerjaan sanitasi air
1.1 pipa air bersih 16.00 Titik Taksir 50,000.00 800,000.00
1.2 pipa air kotor 13.00 Titik Taksir 50,000.00 650,000.00
1.3 pipa pembuangan air besar 8.00 Titik Taksir 50,000.00 400,000.00
Sub Jumlah 61,035,776.51
II. PEKERJAAN PASANGAN PINTU
2.1 Pintu type P2 (9 Unit)
Pintu upvc panel upvc kusen upvc 9.00 Bh Taksir 1,300,000.00 11,700,000.00
Sub Jumlah 11,700,000.00
III. PEKERJAAN LANGIT-LANGIT
3.1 Plafond PVC t=6 mm pada Ruangan dan Selasar termasuk 39.00 m2 Taksir 350,000.00 13,650,000.00
Rangka Furing + Penggantung (Terpasang)
3.2 List Profil PVC 46.20 m' Taksir 70,000.00 3,234,000.00
Sub Jumlah 16,884,000.00
C PEMBANGUNAN GEDUNG LANTAI III
I PEKERJAAN PASANGAN DAN PLESTERAN
a. KM/WC
Pembentukan permukaan dinding untuk dudukan pintu 9.00 Unit Taksir 300,000.00 2,700,000.00
Lantai Keramik 40 x 40 cm' Unpholised 18.9 m2 A.4.4.3.34a 203,766.75 3,851,191.58
Lantai Keramik 20 x 20 cm' Unpholised 35.42 m2 A.4.4.3.50 190,416.60 6,744,555.97
Dinding Keramik 20 x 25 cm' Polished 100.92 m2 A.4.4.3.51 232,190.20 23,432,634.98
Bak air Fiber 8.00 Bh Taksir 300,000.00 2,400,000.00
Kran Air 1/2 13.00 Bh Taksir 30,000.00 390,000.00
Floor Drain + acsesoris 10.00 Bh Taksir 30,000.00 300,000.00
Kloset Jongkok terpasang 8.00 Bh Taksir 1,100,000.00 8,800,000.00
Washtafel + Cer min + Acsesoris Terpasang 3.00 Bh Taksir 1,300,000.00 3,900,000.00
b. Pekerjaan sanitasi air
pipa air bersih 16.00 Titik Taksir 50,000.00 800,000.00
pipa air kotor 13.00 Titik Taksir 50,000.00 650,000.00
pipa pembuangan air besar 8.00 Titik Taksir 50,000.00 400,000.00
Tanki air fiber V=2000 Liter + Acsesoris (setara penguin) 4.00 Unit Taksir 1,500,000.00 6,000,000.00
Sub Jumlah 60,368,382.53
II. PEK. PASANGAN PINTU
2.1 Pintu type P2 (9 Unit)
Pintu upvc panel upvc kusen upvc 9.00 Bh Taksir 1,300,000.00 11,700,000.00
Sub Jumlah 11,700,000.00
III. PEKERJAAN LAIN-LAIN
3.1 Pemindahan / Rehab Instalasi Listrik 1.00 Ls Taksir 500,000.00 500,000.00
Sub Jumlah 500,000.00
A. 2.2.1.4 Pengukuran dan Pemasangan 1m' Bouwplank
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.100 70,000.00 7,000.00
Tukang kayu L.02 OH 0.100 90,000.00 9,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.005 90,000.00 450.00
Jumlah Tenaga Kerja 17,450.00
B BAHAN
Kayu Balok 5/7 m3 0.120 5,000,000.00 600,000.00
Paku 2"-3" Kg 0.020 15,000.00 300.00
Kayu Papan 3/20 m3 0.007 5,000,000.00 35,000.00
Jumlah Harga Bahan 635,300.00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 652,750.00
E Overhead & Profit (15%) 15% x D 97,912.50
F Harga Satuan Pekerjaan (D+E) 750,662.50

A. 2.3.1.1 Penggalian 1 m3 Tanah Biasa sedalam 1 m

No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.750 70,000.00 52,500.00
Mandor L.04 OH 0.025 90,000.00 2,250.00
Jumlah Tenaga Kerja 54,750.00
B BAHAN

Jumlah Harga Bahan


C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 54,750.00
E Overhead & Profit (15%) 10% x D 5,475.00
F Harga Satuan Pekerjaan (D+E) 60,225.00
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
A. 2.3.1.3 Penggalian 1 m3 Tanah Biasa sedalam 3 m

No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 1.050 70,000.00 73,500.00
Mandor L.04 OH 0.067 90,000.00 6,030.00
Jumlah Tenaga Kerja 79,530.00
B BAHAN

Jumlah Harga Bahan


C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 79,530.00
E Overhead & Profit (15%) 10% x D 7,953.00
F Harga Satuan Pekerjaan (D+E) 87,483.00

A. 2.3.1.9 Pengurugan kembali 1 m3 galian tanah


Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koofisien pekerjaan galian
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.250 70,000.00 17,500.00
Mandor L.04 OH 0.008 90,000.00 720.00
Jumlah Tenaga Kerja 18,220.00
B BAHAN

Jumlah Harga Bahan


C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 18,220.00
E Overhead & Profit (15%) 10% x D 1,822.00
F Harga Satuan Pekerjaan (D+E) 20,042.00

A. 2.2.3.1.10 Pemadatan Tanah 1m3 tanah (per 20 cm)


Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koofisien pekerjaan galian
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.500 70,000.00 35,000.00
Mandor L.04 OH 0.050 90,000.00 4,500.00
Jumlah Tenaga Kerja 39,500.00
B BAHAN

Jumlah Harga Bahan


C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 39,500.00
E Overhead & Profit (15%) 15% x D 5,925.00
F Harga Satuan Pekerjaan (D+E) 45,425.00
A. 2.3.1.11 Pengurugan 1 m3 dengan pasir urug
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Mandor L.04 OH 0.010 90,000.00 900.00
Jumlah Tenaga Kerja 21,900.00
B BAHAN
Pasir Urug m3 1.200 100,000.00 120,000.00
Jumlah Harga Bahan 120,000.00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 141,900.00
E Overhead & Profit (15%) 10% x D 14,190.00
F Harga Satuan Pekerjaan (D+E) 156,090.00

A. 2.3.1.14a Pengurugan 1 m3 Tanah Timbun


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.250 70,000.00 17,500.00
Mandor L.04 OH 0.025 90,000.00 2,250.00
Jumlah Tenaga Kerja 19,750.00
B BAHAN
Tanah Timbun m3 1.200 60,000.00 72,000.00
Jumlah Harga Bahan 72,000.00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 91,750.00
E Overhead & Profit (15%) 10% x D 9,175.00
F Harga Satuan Pekerjaan (D+E) 100,925.00

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI

A. 3.2.1.2 Pemasangan 1m3 pondasi batu belah campuran 1SP : 4PP


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1.500 70,000.00 105,000.00
Tukang batu L.02 OH 0.750 90,000.00 67,500.00
Kepala Tukang L.03 OH 0.075 100,000.00 7,500.00
Mandor L.04 OH 0.075 90,000.00 6,750.00
Jumlah Tenaga Kerja 186,750.00
B BAHAN
Batu Belah/ Kali m3 1.200 110,000.00 132,000.00
Semen Portland Kg 163.000 1,350.00 220,050.00
Pasir Pasang m3 0.520 120,000.00 62,400.00
Jumlah Harga Bahan 414,450.00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 601,200.00
E Overhead & Profit (15%) 10% x D 60,120.00
F Harga Satuan Pekerjaan (D+E) 661,320.00
A.3.2.1.2.A Pemasangan 1m3 batu kosong (Aanstamping)
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.780 70,000.00 54,600.00
Tukang batu L.02 OH 0.390 90,000.00 35,100.00
Kepala Tukang L.03 OH 0.039 100,000.00 3,900.00
Mandor L.04 OH 0.039 90,000.00 3,510.00
Jumlah Tenaga Kerja 97,110.00
B BAHAN
Batu Belah/ Kali m3 1.200 110,000.00 132,000.00
Pasir Urug m3 0.432 100,000.00 43,200.00
Jumlah Harga Bahan 175,200.00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 272,310.00
E Overhead & Profit (15%) 10% x D 27,231.00
F Harga Satuan Pekerjaan (D+E) 299,541.00

A. 3.2.1.10 Pemasangan 1m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3KR dan 40% Batu Belah
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 3.400 70,000.00 238,000.00
Tukang batu L.02 OH 0.850 90,000.00 76,500.00
Kepala Tukang L.03 OH 0.085 100,000.00 8,500.00
Mandor L.04 OH 0.170 90,000.00 15,300.00
Jumlah Tenaga Kerja 338,300.00
B BAHAN
Batu Belah/ Kali m3 0.480 110,000.00 52,800.00
Beton K-250 kg 0.660 1,132,784.79 747,637.96
Besi Beton Ulir m3 67.671 14,000.00 947,394.00
Cincin Sumur dia. 100 Bh 5.000 100,000.00 500,000.00
Besi Beton Polos kg 32.299 13,000.00 419,887.00
Kawat Beton kg 1.800 15,000.00 27,000.00
Jumlah Harga Bahan 2,694,718.96
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 3,033,018.96
E Overhead & Profit (15%) 10% x D 303,301.90
F Harga Satuan Pekerjaan (D+E) 3,336,320.86
A. 3.2.1.11 Pemasangan 1m3 pondasi sumuran, diameter 100 cm
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 2.400 70,000.00 168,000.00
Tukang batu L.02 OH 0.800 90,000.00 72,000.00
Kepala Tukang L.03 OH 0.080 100,000.00 8,000.00
Mandor L.04 OH 0.119 90,000.00 10,710.00
Jumlah Tenaga Kerja 258,710.00
B BAHAN
Batu Belah/ Kali m3 0.450 110,000.00 49,500.00
Semen Portland kg 194.000 1,350.00 261,900.00
Pasir Beton m3 0.312 140,000.00 43,680.00
Kerikil m3 0.468 160,000.00 74,880.00
Jumlah Harga Bahan 429,960.00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 688,670.00
E Overhead & Profit (15%) 15% x D 103,300.50
F Harga Satuan Pekerjaan (D+E) 791,970.50

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


Catatan : Bobot isi pasir = 1400 kg/m3 , Bobot isi kerikil = 1350 kg/m3
A. 4.1.1.1 Membuat 1 m3 beton mutu f'c = 7.4 Mpa (K 100),slump (12 ± 2) cm, w/c = 0.87
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1.650 70,000.00 115,500.00
Tukang batu L.02 OH 0.275 90,000.00 24,750.00
Kepala Tukang L.03 OH 0.028 100,000.00 2,800.00
Mandor L.04 OH 0.083 90,000.00 7,470.00
Jumlah Tenaga Kerja 150,520.00
B BAHAN
Semen Portland kg 247 1,350.00 333,450.00
Pasir Beton kg 869 116.67 101,383.33
Kerikil (Maks 30 mm) kg 999 123.08 122,953.85
Air Liter 215 500.00 107,500.00
Jumlah Harga Bahan 665,287.18
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 815,807.18
E Overhead & Profit (15%) 15% x D 122,371.08
F Harga Satuan Pekerjaan (D+E) 938,178.26
A. 4.1.1.2 Membuat 1 m3 beton mutu f'c = 9.8 Mpa (K 125),slump (12 ± 2) cm, w/c = 0.78
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1.650 70,000.00 115,500.00
Tukang batu L.02 OH 0.275 90,000.00 24,750.00
Kepala Tukang L.03 OH 0.028 100,000.00 2,800.00
Mandor L.04 OH 0.083 90,000.00 7,470.00
Jumlah Tenaga Kerja 150,520.00
B BAHAN
Semen Portland kg 276 1,350.00 372,600.00
Pasir Beton kg 828 116.67 96,600.00
Kerikil (Maks 30 mm) kg 1,012 123.08 124,553.85
Air Liter 215 500.00 107,500.00
Jumlah Harga Bahan 701,253.85
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 851,773.85
E Overhead & Profit (15%) 10% x D 85,177.38
F Harga Satuan Pekerjaan (D+E) 936,951.23

A. 4.1.1.3 Membuat 1 m3 beton mutu f'c = 12.2 Mpa (K 150),slump (12 ± 2) cm, w/c = 0.72
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1.650 70,000.00 115,500.00
Tukang batu L.02 OH 0.275 90,000.00 24,750.00
Kepala Tukang L.03 OH 0.028 100,000.00 2,800.00
Mandor L.04 OH 0.083 90,000.00 7,470.00
Jumlah Tenaga Kerja 150,520.00
B BAHAN
Semen Portland kg 299 1,350.00 403,650.00
Pasir Beton kg 799 116.67 93,216.67
Kerikil (Maks 30 mm) kg 1,017 123.08 125,169.23
Air Liter 215 500.00 107,500.00
Jumlah Harga Bahan 729,535.90
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 880,055.90
E Overhead & Profit (15%) 15% x D 132,008.38
F Harga Satuan Pekerjaan (D+E) 1,012,064.28
A. 4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f'c = 7.4 Mpa (K 100),slump (3 - 6) cm, w/c = 0.87
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1.200 70,000.00 84,000.00
Tukang batu L.02 OH 0.200 90,000.00 18,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.060 90,000.00 5,400.00
Jumlah Tenaga Kerja 109,400.00
B BAHAN
Semen Portland kg 230 1,350.00 310,500.00
Pasir Beton kg 893 116.67 104,183.33
Kerikil (Maks 30 mm) kg 1,027 123.08 126,400.00
Air Liter 200 500.00 100,000.00
Jumlah Harga Bahan 641,083.33
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 750,483.33
E Overhead & Profit (15%) 10% x D 75,048.33
F Harga Satuan Pekerjaan (D+E) 825,531.67

A. A.4.1.1.5 Membuat 1 m3 beton mutu f'c = 14.5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0.66
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1.650 70,000.00 115,500.00
Tukang batu L.02 OH 0.275 90,000.00 24,750.00
Kepala Tukang L.03 OH 0.028 100,000.00 2,800.00
Mandor L.04 OH 0.083 90,000.00 7,470.00
Jumlah Tenaga Kerja 150,520.00
B BAHAN
Semen Portland kg 326 1,350.00 440,100.00
Pasir Beton kg 760 116.67 88,666.67
Kerikil (Maks 30 mm) kg 1,029 123.08 126,646.15
Air Liter 215 500.00 107,500.00
Jumlah Harga Bahan 762,912.82
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 913,432.82
E Overhead & Profit (15%) 10% x D 91,343.28
F Harga Satuan Pekerjaan (D+E) 1,004,776.10
A. 4.1.1.6 Membuat 1 m3 beton mutu f'c = 16.9 Mpa (K 200), slump (12 ± 2) cm, w/c = 0.61
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1.650 70,000.00 115,500.00
Tukang batu L.02 OH 0.275 90,000.00 24,750.00
Kepala Tukang L.03 OH 0.028 100,000.00 2,800.00
Mandor L.04 OH 0.083 90,000.00 7,470.00
Jumlah Tenaga Kerja 150,520.00
B BAHAN
Semen Portland kg 352 1,350.00 475,200.00
Pasir Beton kg 731 116.67 85,283.33
Kerikil (Maks 30 mm) kg 1,031 123.08 126,892.31
Air Liter 215 500.00 107,500.00
Jumlah Harga Bahan 794,875.64
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 945,395.64
E Overhead & Profit (15%) 15% x D 141,809.35
F Harga Satuan Pekerjaan (D+E) 1,087,204.99

A. 4.1.1.7. Membuat 1 m3 beton mutu f'c = 19.3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0.58
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1.650 70,000.00 115,500.00
Tukang batu L.02 OH 0.275 90,000.00 24,750.00
Kepala Tukang L.03 OH 0.028 100,000.00 2,800.00
Mandor L.04 OH 0.083 90,000.00 7,470.00
Jumlah Tenaga Kerja 150,520.00
B BAHAN
Semen Portland kg 371 1,350.00 500,850.00
Pasir Beton kg 698 116.67 81,433.33
Kerikil (Maks 30 mm) kg 1,047 123.08 128,861.54
Air Liter 215 500.00 107,500.00
Jumlah Harga Bahan 818,644.87
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 969,164.87
E Overhead & Profit (15%) 10% x D 96,916.49
F Harga Satuan Pekerjaan (D+E) 1,066,081.36
A. 4.1.1.8 Membuat 1 m3 beton mutu f'c = 21.7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0.56
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1.650 70,000.00 115,500.00
Tukang batu L.02 OH 0.275 90,000.00 24,750.00
Kepala Tukang L.03 OH 0.028 100,000.00 2,800.00
Mandor L.04 OH 0.083 90,000.00 7,470.00
Jumlah Tenaga Kerja 150,520.00
B BAHAN
Semen Portland kg 384 1,350.00 518,400.00
Pasir Beton kg 692 116.67 80,733.33
Kerikil (Maks 30 mm) kg 1,039 123.08 127,876.92
Air Liter 215 500.00 107,500.00
Jumlah Harga Bahan 834,510.26
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 985,030.26
E Overhead & Profit (15%) 15% x D 147,754.54
F Harga Satuan Pekerjaan (D+E) 1,132,784.79

A. 4.1.1.9 Membuat 1 m3 beton mutu f'c = 24 Mpa (K 275), slump (12 ± 2) cm, w/c = 0.53
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1.650 70,000.00 115,500.00
Tukang batu L.02 OH 0.275 90,000.00 24,750.00
Kepala Tukang L.03 OH 0.028 100,000.00 2,800.00
Mandor L.04 OH 0.083 90,000.00 7,470.00
Jumlah Tenaga Kerja 150,520.00
B BAHAN
Semen Portland kg 406 1,350.00 548,100.00
Pasir Beton kg 684 116.67 79,800.00
Kerikil (Maks 30 mm) kg 1,026 123.08 126,276.92
Air Liter 215 500.00 107,500.00
Jumlah Harga Bahan 861,676.92
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 1,012,196.92
E Overhead & Profit (15%) 15% x D 151,829.54
F Harga Satuan Pekerjaan (D+E) 1,164,026.46
A. 4.1.1.10 Membuat 1 m3 beton mutu f'c = 26.4 Mpa (K 300), slump (12 ± 2) cm, w/c = 0.52
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 1.650 70,000.00 115,500.00
Tukang batu L.02 OH 0.275 90,000.00 24,750.00
Kepala Tukang L.03 OH 0.028 100,000.00 2,800.00
Mandor L.04 OH 0.083 90,000.00 7,470.00
Jumlah Tenaga Kerja 150,520.00
B BAHAN
Semen Portland kg 413 1,350.00 557,550.00
Pasir Beton kg 681 116.67 79,450.00
Kerikil (Maks 30 mm) kg 1,021 123.08 125,661.54
Air Liter 215 500.00 107,500.00
Jumlah Harga Bahan 870,161.54
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 1,020,681.54
E Overhead & Profit (15%) 15% x D 153,102.23
F Harga Satuan Pekerjaan (D+E) 1,173,783.77

A. 4.1.1.11 Membuat 1 m3 beton mutu f'c = 28.8 Mpa (K 325), slump (12 ± 2) cm, w/c = 0.49
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 2.100 70,000.00 147,000.00
Tukang batu L.02 OH 0.350 90,000.00 31,500.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.105 90,000.00 9,450.00
Jumlah Tenaga Kerja 191,450.00
B BAHAN
Semen Portland kg 439 1,350.00 592,650.00
Pasir Beton kg 670 116.67 78,166.67
Kerikil (Maks 30 mm) kg 1,006 123.08 123,815.38
Air Liter 215 500.00 107,500.00
Jumlah Harga Bahan 902,132.05
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 1,093,582.05
E Overhead & Profit (15%) 15% x D 164,037.31
F Harga Satuan Pekerjaan (D+E) 1,257,619.36
A. 4.1.1.12 Membuat 1 m3 beton mutu f'c = 31.2 Mpa (K 350), slump (12 ± 2) cm, w/c = 0.48
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 2.100 70,000.00 147,000.00
Tukang batu L.02 OH 0.350 90,000.00 31,500.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.105 90,000.00 9,450.00
Jumlah Tenaga Kerja 191,450.00
B BAHAN
Semen Portland kg 448 1,350.00 604,800.00
Pasir Beton kg 667 116.67 77,816.67
Kerikil (Maks 30 mm) kg 1,000 123.08 123,076.92
Air Liter 215 500.00 107,500.00
Jumlah Harga Bahan 913,193.59
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 1,104,643.59
E Overhead & Profit (15%) 15% x D 165,696.54
F Harga Satuan Pekerjaan (D+E) 1,270,340.13

A. 4.1.1.17 Pembesian 10 kg dengan besi polos


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.070 70,000.00 4,900.00
Tukang besi L.02 OH 0.070 90,000.00 6,300.00
Kepala Tukang L.03 OH 0.007 100,000.00 700.00
Mandor L.04 OH 0.004 90,000.00 360.00
Jumlah Tenaga Kerja 12,260.00
B BAHAN
Besi Beton Polos kg 10.500 13,000.00 136,500.00
Kawat Beton kg 0.150 15,000.00 2,250.00
Jumlah Harga Bahan 138,750.00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 151,010.00
E Overhead & Profit (15%) 10% x D 15,101.00
F Harga Satuan Pekerjaan (D+E) 166,111.00
G Harga Satuan per kg besi F : 10 kg 16,611.10
A. 4.1.1.17a Pembesian 10 kg dengan besi ulir
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.070 70,000.00 4,900.00
Tukang besi L.02 OH 0.070 90,000.00 6,300.00
Kepala Tukang L.03 OH 0.007 100,000.00 700.00
Mandor L.04 OH 0.004 90,000.00 360.00
Jumlah Tenaga Kerja 12,260.00
B BAHAN
Besi Beton Ulir kg 10.500 14,000.00 147,000.00
Kawat Beton kg 0.150 15,000.00 2,250.00
Jumlah Harga Bahan 149,250.00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 161,510.00
E Overhead & Profit (15%) 10% x D 16,151.00
F Harga Satuan Pekerjaan (D+E) 177,661.00
G Harga Satuan per kg besi F : 10 kg 17,766.10

A. 4.1.1.20 Pemasangan 1m2 bekesting untuk pondasi


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.520 70,000.00 36,400.00
Tukang kayu L.02 OH 0.260 90,000.00 23,400.00
Kepala Tukang L.03 OH 0.026 100,000.00 2,600.00
Mandor L.04 OH 0.026 90,000.00 2,340.00
Jumlah Tenaga Kerja 64,740.00
B BAHAN
Kayu Klas III m3 0.040 2,500,000.00 100,000.00
Paku 5 - 10 cm kg 0.300 15,000.00 4,500.00
Minyak Bekesting liter 0.100 10,000.00 1,000.00
Jumlah Harga Bahan 105,500.00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 170,240.00
E Overhead & Profit (15%) 10% x D 17,024.00
F Harga Satuan Pekerjaan (D+E) 187,264.00
A. 4.1.1.21 Pemasangan 1m2 bekesting untuk sloof
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.520 70,000.00 36,400.00
Tukang kayu L.02 OH 0.260 90,000.00 23,400.00
Kepala Tukang L.03 OH 0.026 100,000.00 2,600.00
Mandor L.04 OH 0.026 90,000.00 2,340.00
Jumlah Tenaga Kerja 64,740.00
B BAHAN
Kayu Klas III m3 0.045 2,500,000.00 112,500.00
Paku 5 - 10 cm kg 0.300 15,000.00 4,500.00
Minyak Bekesting liter 0.100 10,000.00 1,000.00
Jumlah Harga Bahan 118,000.00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 182,740.00
E Overhead & Profit (15%) 10% x D 18,274.00
F Harga Satuan Pekerjaan (D+E) 201,014.00

A. 4.1.1.22 Pemasangan 1m2 bekesting untuk kolom


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.660 70,000.00 46,200.00
Tukang kayu L.02 OH 0.330 90,000.00 29,700.00
Kepala Tukang L.03 OH 0.033 100,000.00 3,300.00
Mandor L.04 OH 0.033 90,000.00 2,970.00
Jumlah Tenaga Kerja 82,170.00
B BAHAN
Kayu Klas III m3 0.040 2,500,000.00 100,000.00
Paku 5 - 10 cm kg 0.400 15,000.00 6,000.00
Minyak Bekesting liter 0.200 10,000.00 2,000.00
Balok Kayu Klas II m3 0.015 3,500,000.00 52,500.00
Plywood tebal 9 mm Lbr 0.350 140,000.00 49,000.00
Dolken kayu ᴓ 8 - 10 cm
Batang 2.000 7,560.00 15,120.000
- panjang 4 m
Jumlah Harga Bahan 224,620.00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 306,790.00
E Overhead & Profit (15%) 10% x D 30,679.00
F Harga Satuan Pekerjaan (D+E) 337,469.00
A. 4.1.1.23 Pemasangan 1m2 bekesting untuk balok
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.660 70,000.00 46,200.00
Tukang kayu L.02 OH 0.330 90,000.00 29,700.00
Kepala Tukang L.03 OH 0.033 100,000.00 3,300.00
Mandor L.04 OH 0.033 90,000.00 2,970.00
Jumlah Tenaga Kerja 82,170.00
B BAHAN
Kayu Klas III m3 0.040 2,500,000.00 100,000.00
Paku 5 - 10 cm kg 0.400 15,000.00 6,000.00
Minyak Bekesting liter 0.200 10,000.00 2,000.00
Balok Kayu Klas II m3 0.018 3,500,000.00 63,000.00
Plywood tebal 9 mm Lbr 0.350 140,000.00 49,000.00
Dolken kayu ᴓ 8 - 10 cm
Batang 2.000 7,560.00 15,120.000
- panjang 4 m
Jumlah Harga Bahan 235,120.00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 317,290.00
E Overhead & Profit (15%) 10% x D 31,729.00
F Harga Satuan Pekerjaan (D+E) 349,019.00

A. 4.1.1.24 Pemasangan 1m2 bekesting untuk Plat lantai


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.660 70,000.00 46,200.00
Tukang kayu L.02 OH 0.330 90,000.00 29,700.00
Kepala Tukang L.03 OH 0.033 100,000.00 3,300.00
Mandor L.04 OH 0.033 90,000.00 2,970.00
Jumlah Tenaga Kerja 82,170.00
B BAHAN
Kayu Klas III m3 0.040 2,500,000.00 100,000.00
Paku 5 - 10 cm kg 0.400 15,000.00 6,000.00
Minyak Bekesting liter 0.200 10,000.00 2,000.00
Balok Kayu Klas II m3 0.015 3,500,000.00 52,500.00
Plywood tebal 9 mm Lbr 0.350 140,000.00 49,000.00
Dolken kayu ᴓ 8 - 10 cm
Batang 6.000 7,560.00 45,360.000
- panjang 4 m
Jumlah Harga Bahan 254,860.00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 337,030.00
E Overhead & Profit (15%) 10% x D 33,703.00
F Harga Satuan Pekerjaan (D+E) 370,733.00
A. 4.1.1.25 Pemasangan 1m2 bekesting untuk dinding
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.660 70,000.00 46,200.00
Tukang kayu L.02 OH 0.330 90,000.00 29,700.00
Kepala Tukang L.03 OH 0.033 100,000.00 3,300.00
Mandor L.04 OH 0.033 90,000.00 2,970.00
Jumlah Tenaga Kerja 82,170.00
B BAHAN
Kayu Klas III m3 0.030 2,500,000.00 75,000.00
Paku 5 - 10 cm kg 0.400 15,000.00 6,000.00
Minyak Bekesting liter 0.200 10,000.00 2,000.00
Balok Kayu Klas II m3 0.020 3,500,000.00 70,000.00
Plywood tebal 9 mm Lbr 0.350 140,000.00 49,000.00
Dolken kayu ᴓ 8 - 10 cm
Batang 3.000 7,560.00 22,680.000
- panjang 4 m
Penjaga Jarak bekesting/
Buah 4.000 5,000.00 20,000.000
spacer
Jumlah Harga Bahan 244,680.00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 326,850.00
E Overhead & Profit (15%) 15% x D 49,027.50
F Harga Satuan Pekerjaan (D+E) 375,877.50

A. 4.1.1.26 Pemasangan 1m2 bekesting untuk tangga


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.660 70,000.00 46,200.00
Tukang kayu L.02 OH 0.330 90,000.00 29,700.00
Kepala Tukang L.03 OH 0.033 100,000.00 3,300.00
Mandor L.04 OH 0.033 90,000.00 2,970.00
Jumlah Tenaga Kerja 82,170.00
B BAHAN
Kayu Klas III m3 0.030 2,500,000.00 75,000.00
Paku 5 - 10 cm kg 0.400 15,000.00 6,000.00
Minyak Bekesting liter 0.150 10,000.00 1,500.00
Balok Kayu Klas II m3 0.015 3,500,000.00 52,500.00
Plywood tebal 9 mm Lbr 0.350 140,000.00 49,000.00
Dolken kayu ᴓ 8 - 10 cm
Batang 2.000 7,560.00 15,120.000
- panjang 4 m
Jumlah Harga Bahan 199,120.00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 281,290.00
E Overhead & Profit (15%) 15% x D 42,193.50
F Harga Satuan Pekerjaan (D+E) 323,483.50
A. 4.1.1.27 Pemasangan 1m2 jembatan untuk pengecoran beton
No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.150 70,000.00 10,500.00
Tukang kayu L.02 OH 0.050 90,000.00 4,500.00
Kepala Tukang L.03 OH 0.005 100,000.00 500.00
Mandor L.04 OH 0.008 90,000.00 720.00
Jumlah Tenaga Kerja 16,220.00
B BAHAN
Kayu Klas III m3 0.026 2,500,000.00 66,000.00
Paku 5 - 10 cm kg 0.600 15,000.00 9,000.00
Dolken kayu ᴓ 8 - 10 cm
Batang 0.500 7,560.00 3,780.000
- panjang 4 m
Jumlah Harga Bahan 78,780.00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 95,000.00
E Overhead & Profit (15%) 15% x D 14,250.00
F Harga Satuan Pekerjaan (D+E) 109,250.00

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM

A. 4.2.1.2 Pemasangan 1 kg Rangka Kuda-Kuda baja IWF


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.060 70,000.00 4,200.00
Tukang besi L.03 OH 0.060 90,000.00 5,400.00
Kepala Tukang L.03 OH 0.006 100,000.00 600.00
Mandor L.04 OH 0.003 90,000.00 270.00
Jumlah Tenaga Kerja 10,470.00
B BAHAN
Besi Baja IWF kg 1.150 36,000.00 41,400.00
Jumlah Harga Bahan 41,400.00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A + B + C) 51,870.00
E Overhead & Profit (15%) 15% x D 7,780.50
F Harga Satuan Pekerjaan (D+E) 59,650.50

A. 4.2.1.2a Pemasangan 1 M2 Rangka Kuda-Kuda baja ringan


No. Uraian Kode Satuan Koeefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.140 70,000.00 9,800.00
Tukang besi L.03 OH 0.400 90,000.00 36,000.00
Kepala Tukang L.03 OH 0.040 100,000.00 4,000.00
Mandor L.04 OH 0.070 90,000.00 6,300.00
Jumlah Tenaga Kerja 56,100.00
B BAHAN
Baja profil C 75.75 M' 0.420 60,000.00 25,200.00
Reng U 0.5 M' 0.350 45,000.00 15,750.00
Baut Truss Buah 2.000 500.00 1,000.00
Baut Reng Buah 2.000 500.00 1,000.00
Jumlah Harga Bahan 42,950.00
C PERALATAN
Suplemen 1.a
Pondasi Tapak 140 x 140 cm'
1.0000 m3 A. 4.1.1.8 Rp 1,132,784.79 Rp 1,132,784.79
173.1829 Kg A. 4.1.1.17a Rp 17,766.10 Rp 3,076,784.72
Kg A. 4.1.1.17 Rp 16,611.10 Rp -
4.000 m2 A. 4.1.1.20 Rp 187,264.00 Rp 749,056.00
1.000 Ls A.4.4.1.25 Rp 70,000.00 Rp 70,000.00
JUMLAH Rp 5,028,625.51
HARGA SATUAN Rp 5,028,600.00

A.4.4.1.25
1 M3 Membongkar Dan Menyiram Beton
1.0000 OH Pekerja Rp 70,000.00 Rp 70,000.00

JUMLAH Rp 70,000.00
HARGA SATUAN Rp 70,000.00

Suplemen 3.a
Stik Kolom Pedestal 40/40 cm'
1.0000 m3 A. 4.1.1.8 Rp 1,132,784.79 Rp 1,132,784.79
130.2127 Kg A. 4.1.1.17a Rp 17,766.10 Rp 2,313,371.85
46.8569 Kg A. 4.1.1.17 Rp 16,611.10 Rp 778,344.65
6.667 m2 A. 4.1.1.22 Rp 337,469.00 Rp 2,249,905.82
1.000 Ls A.4.4.1.25 Rp 70,000.00 Rp 70,000.00
JUMLAH Rp 6,544,407.12
HARGA SATUAN Rp 6,544,400.00

Suplemen 1.b
Pondasi Tapak 120 x 120 cm'
1.0000 m3 A. 4.1.1.8 Rp 1,132,784.79 Rp 1,132,784.79
178.4156 Kg A. 4.1.1.17a Rp 17,766.10 Rp 3,169,749.39
Kg A. 4.1.1.17 Rp 16,611.10 Rp -
4.000 m2 A. 4.1.1.20 Rp 187,264.00 Rp 749,056.00
1.000 Ls A.4.4.1.25 Rp 70,000.00 Rp 70,000.00
JUMLAH Rp 5,121,590.19
HARGA SATUAN Rp 5,121,500.00

Suplemen 3.b
Stik Kolom Pedestal 30/40 cm
1.0000 m3 A. 4.1.1.8 Rp 1,132,784.79 Rp 1,132,784.79
144.6808 Kg A. 4.1.1.17a Rp 17,766.10 Rp 2,570,413.56
46.8569 Kg A. 4.1.1.17 Rp 16,611.10 Rp 778,344.65
6.667 m2 A. 4.1.1.22 Rp 337,469.00 Rp 2,249,905.82
1.000 Ls A.4.4.1.25 Rp 70,000.00 Rp 70,000.00
JUMLAH Rp 6,801,448.83
HARGA SATUAN Rp 6,801,400.00
Suplemen 3.d
Kolom Praktis 13/13 cm
1.0000 m3 A. A.4.1.1.5 Rp 1,004,776.10 Rp 1,004,776.10
Kg A. 4.1.1.17a Rp 17,766.10 Rp -
257.0244 Kg A. 4.1.1.17 Rp 16,611.10 Rp 4,269,458.01
7.692 m2 A. 4.1.1.22 Rp 337,469.00 Rp 2,595,811.55
1.000 Ls A.4.4.1.25 Rp 70,000.00 Rp 70,000.00
JUMLAH Rp 7,940,045.66
HARGA SATUAN Rp 7,940,000.00

Suplemen 2.a
Sloof 25/40 cm' (SL1)
1.0000 m3 A. 4.1.1.8 Rp 1,132,784.79 Rp 1,132,784.79
99.2872 Kg A. 4.1.1.17a Rp 17,766.10 Rp 1,763,946.32
69.0522 Kg A. 4.1.1.17 Rp 16,611.10 Rp 1,147,033.00
5.333 m2 A. 4.1.1.21 Rp 201,014.00 Rp 1,072,007.66
1.000 Ls A.4.4.1.25 Rp 70,000.00 Rp 70,000.00
JUMLAH Rp 5,185,771.78
HARGA SATUAN Rp 5,185,700.00

Suplemen 3.c
Kolom K3 30/30 cm'
1.0000 m3 A. 4.1.1.8 Rp 1,132,784.79 Rp 1,132,784.79
154.3262 Kg A. 4.1.1.17a Rp 17,766.10 Rp 2,741,774.70
61.3797 Kg A. 4.1.1.17 Rp 16,611.10 Rp 1,019,584.33
8.889 m2 A. 4.1.1.22 Rp 337,469.00 Rp 2,999,761.94
1.000 Ls A.4.4.1.25 Rp 70,000.00 Rp 70,000.00
JUMLAH Rp 7,963,905.77
HARGA SATUAN Rp 7,963,900.00

Suplemen 4.a
Balok Lantai 30/60 cm' (B1)
1.0000 m3 A. 4.1.1.8 Rp 1,132,784.79 Rp 1,132,784.79
84.6986 Kg A. 4.1.1.17a Rp 17,766.10 Rp 1,504,763.80
56.6301 Kg A. 4.1.1.17 Rp 16,611.10 Rp 940,688.25
5.556 m2 A. 4.1.1.23 Rp 349,019.00 Rp 1,939,149.56
1.000 Ls A.4.4.1.25 Rp 70,000.00 Rp 70,000.00
JUMLAH Rp 5,587,386.41
HARGA SATUAN Rp 5,587,300.00

Suplemen 4.b
Balok Lantai 30/50 cm' (B2)
1.0000 m3 A. 4.1.1.8 Rp 1,132,784.79 Rp 1,132,784.79
83.9149 Kg A. 4.1.1.17a Rp 17,766.10 Rp 1,490,840.50
61.3797 Kg A. 4.1.1.17 Rp 16,611.10 Rp 1,019,584.33
5.778 m2 A. 4.1.1.23 Rp 349,019.00 Rp 2,016,631.78
1.000 Ls A.4.4.1.25 Rp 70,000.00 Rp 70,000.00
JUMLAH Rp 5,729,841.42
HARGA SATUAN Rp 5,729,800.00

Suplemen 4.c
Balok Lantai 25/40 cm' (B3)
1.0000 m3 A. 4.1.1.8 Rp 1,132,784.79 Rp 1,132,784.79
85.9947 Kg A. 4.1.1.17a Rp 17,766.10 Rp 1,527,790.44
71.1073 Kg A. 4.1.1.17 Rp 16,611.10 Rp 1,181,170.47
7.000 m2 A. 4.1.1.23 Rp 349,019.00 Rp 2,443,133.00
1.000 Ls A.4.4.1.25 Rp 70,000.00 Rp 70,000.00
JUMLAH Rp 6,354,878.71
HARGA SATUAN Rp 6,354,800.00

Suplemen 4.d
Balok Pinggang 13/15 cm' (Elv.+1.75)
1.0000 m3 A. A.4.1.1.5 Rp 1,004,776.10 Rp 1,004,776.10
Kg A. 4.1.1.17a Rp 17,766.10 Rp -
228.1505 Kg A. 4.1.1.17 Rp 16,611.10 Rp 3,789,830.77
7.692 m2 A. 4.1.1.23 Rp 349,019.00 Rp 2,684,654.15
1.000 Ls A.4.4.1.25 Rp 70,000.00 Rp 70,000.00
JUMLAH Rp 7,549,261.02
HARGA SATUAN Rp 7,549,200.00

Suplemen 6.a
Balok Lantai 25/40 cm' (B3)
1.0000 m3 A. 4.1.1.8 Rp 1,132,784.79 Rp 1,132,784.79
Kg A. 4.1.1.17a Rp 17,766.10 Rp -
141.2899 Kg A. 4.1.1.17 Rp 16,611.10 Rp 2,346,980.66
5.556 m2 A. 4.1.1.24 Rp 370,733.00 Rp 2,059,792.55
1.000 Ls A.4.4.1.25 Rp 70,000.00 Rp 70,000.00
JUMLAH Rp 5,609,558.00
HARGA SATUAN Rp 5,609,500.00

Suplemen 4.e
Balok pet 15/20 cm' (Elv.+2.75)
1.0000 m3 A. 4.1.1.7 Rp 1,066,081.36 Rp 1,066,081.36
Kg A. 4.1.1.17a Rp 17,766.10 Rp -
214.3907 Kg A. 4.1.1.17 Rp 16,611.10 Rp 3,561,265.36
7.778 m2 A. 4.1.1.23 Rp 349,019.00 Rp 2,714,669.78
1.000 Ls A.4.4.1.25 Rp 70,000.00 Rp 70,000.00
JUMLAH Rp 7,412,016.50
HARGA SATUAN Rp 7,412,000.00

Suplemen 6.b
Pengecoran Plat Pet T = 10 cm' (Elv.+2.75)
1.0000 m3 A. 4.1.1.7 Rp 1,066,081.36 Rp 1,066,081.36
Kg A. 4.1.1.17a Rp 17,766.10 Rp -
135.6383 Kg A. 4.1.1.17 Rp 16,611.10 Rp 2,253,101.37
6.667 m2 A. 4.1.1.24 Rp 370,733.00 Rp 2,471,676.91
1.000 Ls A.4.4.1.25 Rp 70,000.00 Rp 70,000.00
JUMLAH Rp 5,860,859.64
HARGA SATUAN Rp 5,860,800.00

Suplemen 6.a
Pengecoran Plat Lantai T = 12 cm' Beton K250
1.0000 m3 A. 4.1.1.8 Rp 1,132,784.79 Rp 1,132,784.79
Kg A. 4.1.1.17a Rp 17,766.10 Rp -
141.2899 Kg A. 4.1.1.17 Rp 16,611.10 Rp 2,346,980.66
5.556 m2 A. 4.1.1.24 Rp 370,733.00 Rp 2,059,792.55
1.000 Ls A.4.4.1.25 Rp 70,000.00 Rp 70,000.00
JUMLAH Rp 5,609,558.00
HARGA SATUAN Rp 5,609,500.00

Suplemen 4.f
Balok Bordes 20/30 cm' (El.+2.23)
1.0000 m3 A. 4.1.1.8 Rp 1,132,784.79 Rp 1,132,784.79
110.7712 Kg A. 4.1.1.17a Rp 17,766.10 Rp 1,967,972.22
90.4255 Kg A. 4.1.1.17 Rp 16,611.10 Rp 1,502,067.02
8.889 m2 A. 4.1.1.23 Rp 349,019.00 Rp 3,102,429.89
1.000 Ls A.4.4.1.25 Rp 70,000.00 Rp 70,000.00
JUMLAH Rp 7,775,253.93
HARGA SATUAN Rp 7,775,200.00

Suplemen 6.c
Pengecoran Anak Tangga
1.0000 m3 A. 4.1.1.8 Rp 1,132,784.79 Rp 1,132,784.79
Kg A. 4.1.1.17a Rp 17,766.10 Rp -
238.1527 Kg A. 4.1.1.17 Rp 16,611.10 Rp 3,955,978.31
4.444 m2 A. 4.1.1.24 Rp 370,733.00 Rp 1,647,537.45
1.000 Ls A.4.4.1.25 Rp 70,000.00 Rp 70,000.00
JUMLAH Rp 6,806,300.56
HARGA SATUAN Rp 6,806,300.00

Suplemen 6.d
Pengecoran Plat Tangga
1.0000 m3 A. 4.1.1.8 Rp 1,132,784.79 Rp 1,132,784.79
Kg A. 4.1.1.17a Rp 17,766.10 Rp -
137.0083 Kg A. 4.1.1.17 Rp 16,611.10 Rp 2,275,858.57
5.556 m2 A. 4.1.1.24 Rp 370,733.00 Rp 2,059,792.55
1.000 Ls A.4.4.1.25 Rp 70,000.00 Rp 70,000.00
JUMLAH Rp 5,538,435.92
HARGA SATUAN Rp 5,538,400.00

Suplemen 4.g
Balok Lantai 25/60 cm' (B4)
1.0000 m3 A. 4.1.1.8 Rp 1,132,784.79 Rp 1,132,784.79
83.9149 Kg A. 4.1.1.17a Rp 17,766.10 Rp 1,490,840.50
60.5577 Kg A. 4.1.1.17 Rp 16,611.10 Rp 1,005,930.01
6.444 m2 A. 4.1.1.23 Rp 349,019.00 Rp 2,249,078.44
1.000 Ls A.4.4.1.25 Rp 70,000.00 Rp 70,000.00
JUMLAH Rp 5,948,633.75
HARGA SATUAN Rp 5,948,600.00

Suplemen 4.h
Balok Lantai 25/45 cm' (B5)
1.0000 m3 A. 4.1.1.8 Rp 1,132,784.79 Rp 1,132,784.79
111.8865 Kg A. 4.1.1.17a Rp 17,766.10 Rp 1,987,786.75
67.5908 Kg A. 4.1.1.17 Rp 16,611.10 Rp 1,122,757.54
6.815 m2 A. 4.1.1.23 Rp 349,019.00 Rp 2,378,564.49
1.000 Ls A.4.4.1.25 Rp 70,000.00 Rp 70,000.00
JUMLAH Rp 6,691,893.57
HARGA SATUAN Rp 6,691,800.00

Suplemen 5.a
Ring Balok 25/35 cm' (RB1) Elv.+11.80
1.0000 m3 A. 4.1.1.8 Rp 1,132,784.79 Rp 1,132,784.79
71.3070 Kg A. 4.1.1.17a Rp 17,766.10 Rp 1,266,847.29
73.2799 Kg A. 4.1.1.17 Rp 16,611.10 Rp 1,217,259.75
7.238 m2 A. 4.1.1.23 Rp 349,019.00 Rp 2,526,199.52
1.000 Ls A.4.4.1.25 Rp 70,000.00 Rp 70,000.00
JUMLAH Rp 6,213,091.36
HARGA SATUAN Rp 6,213,000.00

Suplemen 5.b
Balok Tombak Layar 15/20 cm'
1.0000 m3 A. 4.1.1.7 Rp 1,066,081.36 Rp 1,066,081.36
Kg A. 4.1.1.17a Rp 17,766.10 Rp -
200.3160 Kg A. 4.1.1.17 Rp 16,611.10 Rp 3,327,469.11
6.111 m2 A. 4.1.1.23 Rp 349,019.00 Rp 2,132,855.11
1.000 Ls A.4.4.1.25 Rp 70,000.00 Rp 70,000.00
JUMLAH Rp 6,596,405.58
HARGA SATUAN Rp 6,596,400.00

Suplemen 5.c
Ring Balok 25/30 cm' (RB2) Elv.+11.00)
1.0000 m3 A. 4.1.1.8 Rp 1,132,784.79 Rp 1,132,784.79
65.1064 Kg A. 4.1.1.17a Rp 17,766.10 Rp 1,156,686.81
78.9168 Kg A. 4.1.1.17 Rp 16,611.10 Rp 1,310,894.86
7.556 m2 A. 4.1.1.23 Rp 349,019.00 Rp 2,637,187.56
1.000 Ls A.4.4.1.25 Rp 70,000.00 Rp 70,000.00
JUMLAH Rp 6,307,554.03
HARGA SATUAN Rp 6,307,500.00
DAFTAR HARGA UPAH DAN BAHAN

NO. URAIAN SATUAN HARGA SATUAN (Rp.)

A. UPAH
1 Kepala Tukang Hari 100,000.00
2 Mandor Hari 90,000.00
3 Pekerja Hari 70,000.00
4 Tukang Hari 90,000.00

B. BAHAN
1 Air Liter 500.00
2 Atap Seng Genteng Metal 0,30 Lembar 50,000.00
3 Batu Bata Buah 690.00
Batu Alam M2 100,000.00
4 Balok Kayu Kelas I M3 5,000,000.00
5 Batu Kali/Batu Belah (Sungai/Gunung) 15/20 Cm M3 110,000.00
6 Batu Belah 5/7 Cm M3 130,000.00
7 Besi Beton Polos Kg 13,000.00
8 Besi Beton Ulir Kg 14,000.00
9 Cat Dasar Kg 25,000.00
10 Cat Tembok Kg 30,000.00
11 Cat Kayu/Minyak Kg 44,000.00
12 Cat Menie Besi Kg 21,000.00
Cincin Sumur dia. 100 Bh 100,000.00
13 Kayu Bakau/Dolken Kayu Ø 8 - 10, 4 Meter Batang 7,560.00
14 Engsel Jendela 3" Pasang 10,000.00
15 Engsel Pintu 4" Pasang 12,650.00
16 Kaca Bening Tebal 5 mm M2 57,500.00
17 Kait Angin Buah 10,000.00
18 Kawat Beton Kg 15,000.00
19 Kayu Klas I (Semantok/Damar Laut) M3 5,000,000.00
20 Kayu Klas II (Merantee/Kruing) M3 3,500,000.00
21 Kayu Klas III (Semaram/Borneo/dll) untuk Bekesting M3 2,500,000.00
22 Kayu Klas IV (Sengon/dll) untuk Bouwplank M3 2,000,000.00
Kayu Kaso M3 1,800,000.00
23 Keramik sisi kulit jeruk 20 x 20 Cm Buah 2,400.00
24 Keramik 40 x 40 Cm Homogenius Polished Buah 13,000.00
25 Keramik 40 x 40 Cm Homogenius Unpolished Buah 12,000.00
26 Keramik 30 x 30 Cm Homogenius Polished Buah 5,130.00
27 Keramik 30 x 30 Cm Homogenius Unpolished Buah 5,220.00
28 Keramik 25 x 25 Cm Buah 2,500.00
29 Keramik dinding 20 x 25 Cm Buah 3,050.00
30 Kerikil Beton/Bersih M3 160,000.00
31 Kerikil Beton/Bersih (1.300 Kg/M3) Kg 123.08
NO. URAIAN SATUAN HARGA SATUAN (Rp.)

32 Kertas Amplas Lembar 5,000.00


33 Kunci Pintu Buah 49,450.00
NO. URAIAN SATUAN HARGA SATUAN (Rp.)

34 Lem Kayu Kg 19,000.00


35 List Profil Kayu M' 4,000.00
36 Minyak Bekisting Liter 10,000.00
37 Paku Kayu Biasa Kg 15,000.00
38 Paku Triplek Kg 14,000.00
39 Paku Skrup Bh 500.00
40 Paku Skrup Kg 20,000.00
41 Pasir Beton M3 140,000.00
42 Pasir Beton (1.200 Kg/M3) Kg 116.67
43 Pasir Pasang M3 120,000.00
44 Pasir Pasang (1.400 Kg/M3) Kg 85.71
45 Pasir Urug M3 100,000.00
46 Pemasangan Titik Lampu + Instalasi Titik 100,000.00
47 Plamir Kg 20,000.00
48 Plywood form 4 mm Lembar 71,000.00
49 Plywood form 9 mm Lembar 140,000.00
50 Rabung Seng Spandex Lembar 45,000.00
51 Semen Portland @ 40 Kg Zak 54,000.00
52 Semen Porland Kg 1,350.00
53 Semen Warna @ 50 Kg Zak 90,000.00
54 Semen Warna Kg 1,800.00
55 Seng Spandex Lembar 50,000.00
56 Seng Gelombang Bjls. 0,2 Lembar 50,000.00
57 Seng Plat Bjls. 0,2 Lembar 50,000.00
58 Tanah Timbun M3 60,000.00
59### Triplek 4 MM Lembar 70,000.00
60 Grendel Jendela psang 6,000.00
61 Tarikan Jendela Buah 6,000.00
62 Lampu HE 23 Watt setar Fhilip Buah 50,000.00
63 Lampu HE 18 Watt setar Fhilip Buah 30,000.00
64 Saklar dua ( Dauble) merek Barco Buah 15,000.00
65 Saklar tiga ( Dauble) merek Barco Buah 20,000.00
66 Stop Kontak Buah 15,000.00
67 Washtafel Unit 1,500,000.00
68 Baja profil C 75.75 M' 60,000.00
69 Reng U 0.5 M' 45,000.00
70 Baut Truss Buah 500.00
71 Baut Reng Buah 500.00
72 Tiner Liter 25,000.00
73 Kuas Buah 10,000.00
74 Baut Kg 25,000.00
75 Paku Seng Kg 25,000.00
REKAPITULASI
BLOCK C
Pekerjaan : Lanjutan Pembangunan RKB SMPN 1 Lhoksukon Kontruksi II Lantai Bangun Lantai I Block B dan Block C (Relokasi)
Lokasi : Kab. Aceh Utara (6 Ruang)
Lokasi : Kecamatan Lhoksukon Kabupaten Aceh Utara

JUMLAH HARGA
NO. JENIS PEKERJAAN
(Rp.)

III. PEMBANGUAN RUANG KELAS BLOCK C

A. PEKERJAAN BETON/BETON BERTULANG LANTAI II Rp. 163,291,872.61

B. PEKERJAAN PASANGAN DAN PLESTERAN Rp. 96,612,003.02

C. PEKERJAAN LANTAI Rp. #NAME?

D. PEKERJAAN ATAP DAN PLAFOND Rp. #NAME?

E. PEKERJAAN PINTU, JENDELA DAN KUNCI (LANTAI II) Rp. 40,099,418.00

F. PEKERJAAN LISTRIK (LANTAI I DAN II) Rp. #NAME?

G. PEKERJAAN PENGECATAN (LANTAI I DAN LANTAI II) Rp. 58,643,858.18

(A) JUMLAH HARGA PEKERJAAN Rp. #NAME?


(B) JUMLAH DIBULATKAN Rp. #NAME?
Terbilang : Dua Milyar Sembilan Ratus Delapan Puluh Sembilan Juta Delapan Puluh Ribu Rupiah,-
BILL OF QUANTITY (BOQ)

Pekerjaan : Lanjutan Pembangunan RKB SMPN 1 Lhoksukon Kontruksi II Lantai Bangun Lantai I Block B dan Block C (Relokasi)
Lokasi : Kab. Aceh Utara (6 Ruang)
Lokasi : Kecamatan Lhoksukon Kabupaten Aceh Utara

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6 7=3x6

III. PEMBANGUAN RUANG KELAS BLOCK C


A. PEKERJAAN BETON/BETON BERTULANG
LANTAI II
15 Beton Bertulang Kolom Induk 30/40 cm 11.700 M³ SUPLEMEN.9 5,097,693.82 59,643,017.69
16 Beton Bertulang Kolom Teras 30/30 cm 3.380 M³ SUPLEMEN.10 5,507,372.21 18,614,918.06
17 Beton Bertulang Balok 25/30 cm 13.340 M³ SUPLEMEN.8 5,260,694.85 70,177,669.28
18 Beton Bertulang Balok Latai 13/15 cm 1.380 M³ SUPLEMEN.5 6,846,206.26 9,447,764.63
19 Beton Bertulang untuk selasar 13/15 cm (dudukan batu bata) 0.790 M³ SUPLEMEN.5 6,846,206.26 5,408,502.94
Sub Jumlah 163,291,872.61
B. PEKERJAAN PASANGAN DAN PLESTERAN
LANTAI II
1 Pasangan Dinding Bata 1 PC : 4 PS 311.715 M² A. 4.4.1.9 111,468.50 34,746,403.48
2 Plesteran Dinding Bata 1 PC : 4 PS 623.430 M² A. 4.4.2.4 53,519.40 33,365,599.54
6 Pemasangan Batu Kerawang 4.00 M² Taksir 250,000.00 1,000,000.00
7 Rellif Tiang Teras Sampai Lantai II (seperti Gambar) 10.00 Unit Taksir 500,000.00 5,000,000.00
8 Pemasangan Pagar Pengaman Teras (seperti Gambar) 1.00 Unit Taksir 8,000,000.00 8,000,000.00
9 Rellif Motif Tali Air (seperti Gambar) 1.00 ls Taksir 4,500,000.00 4,500,000.00
10 Pagar Pengaman Tangga Besi Galvanis 1.00 M' Taksir 5,500,000.00 5,500,000.00
11 Pintu Pengaman dari Teralis Untuk Tangga Lantai II ( Gambar) 1.00 Unit Taksir 4,500,000.00 4,500,000.00
Sub Jumlah 96,612,003.02
C. PEKERJAAN LANTAI
Pekerjaan Lantai Keramik
LANTAI I
1 Lantai Keramik 40 x 40 cm Anti Slip Pada Selasar 146.900 M² A.4.4.3.34 210,982.75 30,993,365.98
2 Lantai Keramik 40 x 40 cm Anti Slip Pada Anak Tangga 28.000 M² A.4.4.3.34 210,982.75 5,907,517.00
3 Bon-Bon Keramik 40.000 M¹ Taksir 10,000.00 400,000.00
LANTAI II
1 Lantai Keramik 40 x 40 cm Ruangan #NAME? A.4.4.3.34 210,982.75 #NAME?
2 Lantai Keramik 40 x 40 cm Anti Slip Pada Selasar #NAME? A.4.4.3.34 210,982.75 #NAME?
3 Bon-Bon Keramik #NAME? Taksir 10,000.00 #NAME?
Sub Jumlah #NAME?
D. PEKERJAAN ATAP DAN PLAFOND
LANTAI I
1 Kayu Kanopi Kuda-kuda Terpasang 10.000 Bh Taksir 350,000.00 3,500,000.00
2 Memasang Gording Kayu 0.540 M³ A. 4.6.1.15 7,044,565.00 3,804,065.10
3 Memasang Atap Genteng Metal 66.600 M² A. 4.5.2.32a 76,549.00 5,098,163.40
4 Kayu Listplank Uk. 3/20 cm 42.000 M' A. 4.6.1.21 53,229.00 2,235,618.00
5 Memasang Rangka Langit-langit (60 x 60) cm 303.919 M² A. 4.6.1.20 85,789.00 26,072,907.09
6 Memasang Langit-langit Tripleks t = 4 mm 366.149 M² A. 4.5.1.5 48,532.00 17,769,919.00
7 List Plafond 128.000 M¹ A. 4.5.1.9 14,432.00 1,847,296.00
LANTAI II
1 Rangka Kuda-Kuda dan Gording Zincalume Type 100, 565.250 M² Taksir 220,000.00 124,355,000.00
Penutup Atap dan Rabung Genteng Metal + Terpasang
2 Kayu Listplank Uk. 3/20 cm 107.960 M¹ A. 4.6.1.21 53,229.00 5,746,602.84
3 Memasang Rangka Langit-langit (60 x 60) cm #NAME? M² A. 4.6.1.20 85,789.00 #NAME?
4 Memasang Langit-langit Tripleks t = 4 mm #NAME? M² A. 4.5.1.5 48,532.00 #NAME?
5 List Plafond #NAME? M¹ A. 4.5.1.9 14,432.00 #NAME?
6 Pemasangan Anti Petir, Lengkap, Siap Terpasang (Sesuai Gambar) 1.000 Ls Taksir 15,000,000.00 15,000,000.00
Sub Jumlah #NAME?
E. PEKERJAAN PINTU, JENDELA DAN KUNCI (LANTAI II)
1 Pintu Type P1 (4 Unit)
a. Kosen Kayu 5/13 0.210 M³ A. 4.6.1.1 7,133,225.00 1,497,977.25
b. Daun Pintu Panel Ukuran 60 x 210 cm 8.000 unit Taksir 850,000.00 6,800,000.00
c. Ventilasi Ambang Ukuran 40 x 60 cm 8.000 unit Taksir 130,000.00 1,040,000.00
d. Kunci Tanam Bulat 4.000 buah Taksir 75,000.00 300,000.00
e. Pegangan Pintu 4.000 buah Taksir 75,000.00 300,000.00
f. Engsel Pintu 24.000 psg Taksir 12,650.00 303,600.00
g. Engsel Ventilasi 16.000 psg Taksir 10,000.00 160,000.00
h. Hak Angin Jendela / Ventilasi 8.000 psg Taksir 10,000.00 80,000.00
i. Grendel Ventilasi 4.000 buah Taksir 5,000.00 20,000.00
j. Tarikan Jendela 4.000 buah Taksir 5,000.00 20,000.00
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6 7=3x6

2 Jendela Ambang Kaca Type J1 (12 Unit)


a. Kosen Kayu 5/13 1.170 M³ A. 4.6.1.1 7,133,225.00 8,345,873.25
b. Daun Jendela Ukuran 60 x 85 cm 48.000 Unit Taksir 200,000.00 9,600,000.00
c. Ventilasi Ambang Ukuran 40 x 60 cm 48.000 Unit Taksir 90,000.00 4,320,000.00
d. Engsel Jendela 24.000 Psg Taksir 10,000.00 240,000.00
e. Engsel Ventilasi 24.000 Psg Taksir 10,000.00 240,000.00
f. Grendel Jendela / Ventilasi 48.000 Buah Taksir 5,000.00 240,000.00
g. Hak Angin Jendela / Ventilasi 24.000 Psg Taksir 10,000.00 240,000.00
h. Tarikan Jendela 48.000 Buah Taksir 5,000.00 240,000.00
3 Jendela Ambang Kaca Type J2 (4 Unit)
a. Kosen Kayu 5/13 0.300 M³ A. 4.6.1.1 7,133,225.00 2,139,967.50
b. Daun Jendela Ukuran 60 x 85 cm 12.000 Unit Taksir 200,000.00 2,400,000.00
c. Ventilasi Ambang Ukuran 40 x 60 cm 12.000 Unit Taksir 90,000.00 1,080,000.00
d. Engsel Jendela 12.000 Psg Taksir 10,000.00 120,000.00
e. Engsel Ventilasi 12.000 Psg Taksir 10,000.00 120,000.00
f. Grendel Jendela / Ventilasi 12.000 Buah Taksir 6,000.00 72,000.00
g. Hak Angin Jendela / Ventilasi 12.000 Psg Taksir 10,000.00 120,000.00
h. Tarikan Jendela 12.000 Buah Taksir 5,000.00 60,000.00
Sub Jumlah 40,099,418.00
F. PEKERJAAN LISTRIK (LANTAI I DAN II)
1 Armatur
- Lampu HE 18 Watt Setara Hannoch 36.000 Unit Taksir 25,000.00 900,000.00
2 Stop Kontak 9.000 Buah Taksir 15,000.00 135,000.00
3 Instalasi titik penerangan, instalasi termasuk kabel 36.000 Titik Taksir 90,000.00 3,240,000.00
NYA 3 x 2.5 mm dalam pipa PVC fitting lampu dan
kelengkapan instalasi terpasang
4 Instalasi titik kontak, instalasi termasuk kabel 9.000 Titik Taksir 90,000.00 810,000.00
NYA 3 x 2.5 mm dalam pipa PVC, kotak stop kontak
BROCO dan kelengkapan instalasi terpasang
5 Saklar Lampu
- Saklar Tunggal (Single) Merk BROCO 1.000 Unit Taksir #NAME? #NAME?
- Saklar Dua Seri (Double) Merk BROCO 4.000 Unit Taksir 25,000.00 100,000.00
- Saklar Tiga Seri (Triple) Merk BROCO 1.000 Unit Taksir 37,500.00 37,500.00
Sub Jumlah #NAME?
G. PEKERJAAN PENGECATAN (LANTAI I DAN LANTAI II)
1 Cat Tembok 3 x (L/D) 1,326.060 M² A. 4.7.1.10 26,301.00 34,876,704.06
2 Cat Tembok Pada Plat Lantai (Pengganti Plafond) 786.453 M² A. 4.7.1.10 26,301.00 20,684,500.35
3 Cat Kayu Lesplang dan Lis Plafond 53.889 M² A. 4.7.1.4 32,417.00 1,746,911.28
4 Cat Mengkilat Kosen, Daun Pintu, Jendela dan Jelusi 41.205 M² A. 4.7.1.4 32,417.00 1,335,742.49
Sub Jumlah 58,643,858.18