Anda di halaman 1dari 1

RAB Pembaharuan Jaringan Internet Kantor Timah

Harga (Rp)
No. Uraian Pekerjaan Sat Vol
Satuan Jumlah
A MATERIAL PEKERJAAN LT01
1 INDORACK WIR5508S Wallmount 8U pcs 1 2,100,000 2,100,000
2 Konverter TPLINK MC111CS MC112CS set 2 600,000 1,200,000
3 Mikrotik RB750r2 pcs 1 700,000 700,000
4 Kabel LAN STP m 30 8,000 240,000
5 TPLINK Switch Hub 5port pcs 2 80,000 160,000
6 TPLINK Switch HUB 8port pcs 1 90,000 90,000
7 Patchcord SC-SC 3m pcs 2 35,000 70,000
Sub. Total 4,560,000
B PEKERJAAN JASA
1 Installasi dan Aktivasi LAN R. SM dan R. Istirahat Direksi spot 1 800,000 800,000
2 Installasi dan Konfigurasi Mikrotik spot 2 350,000 700,000
3 Installasi dan Aktivasi Konverter spot 6 250,000 1,500,000
Sub. Total 3,000,000
C MATERIAL PEKERJAAN LT02
1 TPLINK MC111CS MC112CS pcs 4 560,000 2,240,000
2 Mikrotik RB750r2 pcs 1 700,000 700,000
3 TPLINK Switch Hub 5port pcs 1 80,000 80,000
4 TPLINK Switch HUB 8port pcs 1 90,000 90,000
5 Patchcord SC-SC 3m pcs 4 35,000 140,000
Total Perangkat 3,250,000
Total OSP dan Perangkat 10,810,000

Bekasi, 11 Februari 2021


Dibuat oleh,

M.Redha

Anda mungkin juga menyukai