II PEKERJAAN TANAH
1 Cut & Fill (Kupas Tanah Dan Urug) - M³ 35,000 - 35,000
2 Suply Fill Area (Urugan Tanah Dari Luar) - M³ 35,000 50,000 85,000
2 Cut (Galian) - M³ 40,000 - 40,000 Alat / Volume Besar
- M³ 120,000 - 120,000 Manual Volume Kecil
3 Disposal (buang tanah) - M³ 35,000 - 35,000 Alat / Volume Besar
- M³ 100,000 100,000 Manual Volume Kecil
4 Back Fill) (Urug Kembali) - M³ 30,000 - 30,000 Alat / Volume Besar
- M³ 100,000 100,000 Manual Volume Kecil
III PEKERJAAN PONDASI
1 Psang Batukali Batu Pecah Hitam Non Exspouse M³ 150,000 500,000 650,000
Page 1 of 8
LIST DAFTAR HARGA BORONGAN BANGUNAN
AREA JAWA TENGAH
HARGA
NO. DESCRIPTION UNIT AMOUNT REMAKS
UPAH MATERIAL
VII Pekerjaan Atap
1 Baja ringan Truss 0,75 SNI M² 35,000 100,000 135,000
2 Foil Single paper, foil karung M² 5,000 15,000 20,000
3 Genteng Keramik Kia, M-klass M² 30,000 155,000 185,000
4 Nok/ Kerpus Kia, M-klass include finish waterprofing M' 100,000 150,000 250,000
VIII Pekerjaan Plafond
1 Pasang Plafond Include Cat Frame : Holow 2x4 cover : Knauf, Gyprock setara, cat : aries , sanalux M² 35,000 70,000 105,000
Page 2 of 8
LIST DAFTAR HARGA BORONGAN BANGUNAN
AREA JAWA TENGAH
HARGA
NO. DESCRIPTION UNIT AMOUNT REMAKS
UPAH MATERIAL
3 Bak KM Finish Keramik Uk 70 x 70 x 70 cm Unit 350,000 500,000 850,000
4 Kloset Jongkok + Dudukan Ex Ina Unit 250,000 400,000 650,000
5 Septic tank Bio text Unit - - - Lihat Desain
CATATAN :
1. Semua Ijin Kerja, Pembangunan & Kordinasi Lingkungan Menjadi Tanggung Jawab Pemberi Kerja
2. Arus Listrik Genset / PLN disedikan Oleh Pemberi Kerja
3. Volume dihitung berdasarkan actual yang dikerjakan
4. Item pekerjaan yang belum masuk dan tertera dalam penawaran termasuk pekerjaan tambahan
dan akan dihitung dan dibayar sesuai kesepakatan
IMAM MUSTAJIB
Page 3 of 8
CALCULATION
R. GENSET & SAMPAH
CALCULATION
NO JOB DESCRIPTION Qty Unit TOTAL VOLUME
a b c d
I Stone Mansory (a) Sandlayer Stone mansory
1 Sandlayer
Pot V 5.70 x 0.10 x 1.50 0.86 1.00 0.86 0.86
Pot W 58.30 x 0.10 x 0.90 5.25 1.00 5.25 5.25
Pot Y 121.56 x 0.10 x 0.90 10.94 1.00 10.94 10.94
Pot Z 25.00 x 0.10 x 1.50 3.75 1.00 3.75 3.75
2 Stone mansory
Pot V 5.70 x 0.80 x 1.15 5.24 1.00 5.24 5.24
Pot W 58.30 x 0.80 x 0.55 25.65 1.00 25.65 25.65
Pot Y 121.56 x 0.80 x 0.55 53.49 1.00 53.49 53.49
Pot Z 25.00 x 0.80 x 1.15 23.00 1.00 23.00 23.00
Total 20.79 107.38 - - - -
II Foundation Pilecap Sandlayer Formwork Roundbar Concrete
1 Sandlayer
P1 1.90 x 1.90 x 0.10 0.36 4.00 1.44 1.44
P2 1.30 x 1.30 x 0.10 0.17 10.00 1.69 1.69
P3 1.70 x 1.70 x 0.10 0.29 4.00 1.16 1.16
2 Formwork
P1 1.80 x 4.00 x 0.25 1.80 4.00 7.20 7.20
P2 1.20 x 4.00 x 0.20 0.96 10.00 9.60 9.60
P3 1.60 x 4.00 x 0.25 1.60 4.00 6.40 6.40
3 Roundbar
P1
Bottom D13 1.04 x 2.10 x 10.00 21.88 4.00 87.52 87.52
Top D 10 0.62 x 2.10 x 10.00 12.95 4.00 51.79 51.79
P2
Bottom D13 1.04 x 1.40 x 7.00 10.21 10.00 102.10 102.10
Top D 10 0.62 x 1.40 x 7.00 6.04 10.00 60.42 60.42
P3
Bottom D13 1.04 x 1.90 x 9.00 17.82 4.00 71.26 71.26
Top D 10 0.62 x 1.90 x 9.00 10.54 4.00 42.17 42.17
4 Concrete
P1 1.80 x 1.80 x 0.25 0.81 4.00 3.24 3.24
P2 1.20 x 1.20 x 0.20 0.29 10.00 2.88 2.88
P3 1.60 x 1.60 x 0.25 0.64 4.00 2.56 2.56
4.29 23.20 415.26 8.68 - -
III Foundation Mechine Sandlayer Formwork Roundbar Concrete
1 Sandlayer 1.60 x 3.85 x 0.10 0.62 3.00 1.85 1.85
2 Formwork 1.50 x 1.00 x 2.00 3.00 3.00 9.00 9.00
3.75 x 1.00 x 2.00 7.50 3.00 22.50 22.50
3 Roundbar
Bottom D16 1.58 x 3.20 x 19.00 95.96 3.00 287.87 287.87
1.58 x 5.45 x 8.00 68.81 3.00 206.43 206.43
Midle D13 1.04 x 10.50 x 3.00 32.82 3.00 98.46 98.46
Top D 16 1.58 x 2.20 x 19.00 65.97 3.00 197.91 197.91
1.58 x 4.45 x 8.00 56.19 3.00 168.56
4 Concrete 1.50 x 3.75 x 1.00 5.63 3.00 16.88 16.88
1.85 31.50 790.67 16.88 - -
IV Sloof Formwork Roundbar Concrete
1 Formwork
20/30 210.56 x 0.30 x 2.00 126.34 1.00 126.34 126.34
15/20 24.00 x 0.20 x 2.00 9.60 1.00 9.60 9.60
2 Roundbar
20/30
Mainbar 4D13 1.04 x 210.56 x 1.04 228.15 4.00 912.62 912.62
Midlebar 2D10 0.62 x 210.56 x 1.03 133.70 2.00 267.41 267.41
Ringbar D10-200 0.62 x 0.90 x 1.00 0.55 1,052.80 584.15 584.15
15/20
Mainbar 4D10 0.62 x 24.00 x 1.00 14.80 4.00 59.18 59.18
Ringbar D8-200 0.39 x 0.60 x 1.00 0.24 120.00 28.41 28.41
3 Concrete 0.30 x 0.20 x 90.00 5.40 1.00 5.40 5.40
20/30 210.56 x 0.30 x 0.20 12.63 1.00 12.63 12.63
15/20 24.00 x 0.20 x 0.15 0.72 1.00 0.72 0.72
135.94 1,857.17 13.35 - - -