KECAMATAN
NO JENIS BAHAN DAN MATERIAL SATUAN
SERUYAN HILIR
1 2 3 4
I BAHAN KAYU
1 Balok Kayu Kls I M3 6,500,000.00
2 Balok Kayu Kls II M3 2,500,000.00
3 Balok Kayu Kls III M3 2,000,000.00
4 Kayu Bulat ( Biasa / Hutan ) Btg 5,000.00
5 Kayu Dolken / Galam Dia. 8 - 10 cm Btg 15,000.00
6 List Profil Moulding biasa M' 15,000.00
7 Papan Kayu Kls I M3 11,560,000.00
8 Papan Kayu Kls II M3 3,000,000.00
9 Papan Kayu Kls III M3 2,480,000.00
10 Papan Kayu Kls IV M3 2,000,000.00
11 Papan Moulding Kls.II M3 375,000.00
12 Matting (Kayu Bulat) Btg 12,000.00
13 Matting (Batang Pohon Kelapa) Btg 200,000.00
14 Kayu Bakar M3 550,000.00
II PENUTUP ATAP
1 Aluminium Plat lbr 60 cm M' 25,000.00
2 Bubungan Metal 1/2 Bundar M' 19,000.00
3 Bubungan Segi Empat M' 15,000.00
4 Genteng Beton Bh 8,000.00
5 Genteng Kodok Bh 3,800.00
6 Genteng Metal Tbl. 0,25 mm 2 x 4 Lbr 36,000.00
7 Genteng Metal Tbl. 0,30 mm 2 x 4 Lbr 45,000.00
8 Kuda2 Metal Zincalume ( Baja Ringan) Pelana M2 200,000.00
9 Nok Genteng Metal Bh 22,000.00
10 Plastik Gelombang Kecil Lbr 20,000.00
11 Rangka Plafond (Baja Ringan) Zincalume M2 116,000.00
12 Seng Gelombang Kecil Lbr 50,000.00
13 Seng Gelombang Besar Lbr 50,000.00
14 Seng Plat Lebar 30 Cm M' 11,000.00
15 Seng Plat Lebar 40 Cm M' 14,000.00
16 Seng Plat Lebar 60 cm M' 20,000.00
17 Talang PVC 1/2 Lingkaran Btg 110,000.00
KECAMATAN
NO JENIS BAHAN DAN MATERIAL SATUAN
SERUYAN HILIR
1 2 3 4
18 Talang PVC Siku-siku Btg 105,000.00
IV PAKU
1 Paku Asbes Kg 27,000.00
2 Paku Beton Bh 900.00
3 Paku Genteng Metal Kg 23,000.00
4 Paku Kait Bh 25,000.00
5 Paku Kayu Kg 18,000.00
6 Paku Plywood/Teakwood Kg 21,000.00
7 Paku Seng Kg 50,000.00
8 Paku Sirap Kg 21,000.00
9 Paku Skrup Bj 200.00
10 Paku Ulin Kg 20,000.00
V SEMEN
2 Semen PC Kg 1,375.00
3 Semen Putih Kg 3,500.00
4 Semen Warna Kg 12,000.00
VI BESI, KAWAT
1 Besi beton polos Kg 13,000.00
2 Besi beton ulir Kg 15,000.00
3 Besi Beugel / Strip ( Kuda - kuda ) Bh 5,000.00
4 Kawat Beronjong Biasa Ø 2,7 mm (2m x 1 m x 0,5 m) Unit 231,000.00
KECAMATAN
NO JENIS BAHAN DAN MATERIAL SATUAN
SERUYAN HILIR
1 2 3 4
5 Kawat Beronjong Biasa Ø 3 mm (2m x 1 m x 0,5 m) Unit 278,250.00
6 Kawat Beton/Bendrat Kg 18,000.00
7 Kawat Duri ( 1 Rol = 35 m' ) Rol 75,000.00
8 Kawat Harmonika ( lbr. 1 m ) M' 20,000.00
9 Kawat Kasa Besi M2 20,000.00
10 Kawat Kasa Plastik M 2
17,000.00
11 Kawat Wiremesh Polos (2.1m x 54 m x 347,6 Kg) M6 Rol 4,000,000.00
12 Kawat Wiremesh Ulir (2.1m x 54 m x 347,6 Kg) M6 Rol 4,500,000.00
13 Pagar Besi Pipa M2 500,000.00
14 Pagar Besi Ulir/Tempa M2 550,000.00
15 Plat Besi Tebal 2 mm polos Lbr 500,000.00
16 Plat Besi Tebal 3 mm polos Lbr 600,000.00
17 Teralis Besi Bermotif M2 600,000.00
18 Teralis Besi Biasa M2 500,000.00
1 2 3 4
22 Tanah Pilihan (Latrit) M3 -
23 Tanah Urug M3 90,000.00
VIII KERAMIK
1 Keramik 20 x 20 cm (merk Asia) M2 65,000.00
2 Keramik 20 x 25 cm (merk Asia) M 2
65,000.00
3 Keramik 30 x 30 cm (merk Asia) M2 70,000.00
4 Keramik 40 x 40 cm (merk Asia) M2 79,000.00
5 Keramik 30 x 30 cm (merk Mulia) M2 70,000.00
6 Keramik 40 x 40 cm (merk Mulia) M2 75,000.00
7 Keramik 30 x 30 cm (merk Impresso) M2 79,000.00
8 Keramik 40 x 40 cm (merk Impresso) M2 80,000.00
9 Keramik 20 x 20 cm (merk Diamond) M2 65,000.00
10 Keramik 20 x 25 cm (merk Diamond) M2 65,000.00
11 Keramik 30 x 30 cm (merk Diamond) M2 70,000.00
12 Keramik 40 x 40 cm (merk Diamond) M2 75,000.00
13 Keramik 20 x 20 cm (merk Masterina) M2 69,000.00
14 Keramik 20 x 25 cm (merk Masterina) M2 72,000.00
15 Keramik 30 x 30 cm (merk Masterina) M2 73,500.00
16 Keramik 40 x 40 cm (merk Masterina) M2 75,000.00
17 Keramik 20 x 20 cm (merk Roman) M2 107,250.00
18 Keramik 20 x 25 cm (merk Roman) M2 115,000.00
19 Keramik 30 x 30 cm (merk Roman) M2 109,000.00
20 Keramik 40 x 40 cm (merk Roman) M2 120,000.00
21 Keramik 60 x 60 cm (merk Roman) M2 189,000.00
22 Keramik 60 x 60 cm (merk Granito) M2 285,000.00
23 Plint keramik 10 x 20 cm M2 10,000.00
24 Plint keramik 10 x 30 cm M2 13,750.00
25 Plint keramik 10 x 40 cm M2 20,000.00
26 Porselin 11 x 11 cm M2 10,000.00
27 Mozaik 30 x 30 cm M2 50,000.00
28 Marmer 40 x 40 cm M2 355,000.00
IX AKSESORIS
1 Bak Cuci Piring Logam Double lengkap Bh 450,000.00
2 Bak Cuci Piring Logam Tunggal lengkap Bh 375,000.00
3 Bak Cuci Tangan ( Westapel Keramik ) Bh 350,000.00
KECAMATAN
NO JENIS BAHAN DAN MATERIAL SATUAN
SERUYAN HILIR
1 2 3 4
4 Bak Mandi Fiber dia. 60 x 60 x 60 Bh 400,000.00
5 Bak Fiber dia 60 x 40 x 40 Bh 200,000.00
6 Bak Mandi sudut kecil Bh 300,000.00
7 Bak Mandi sudut besar Bh 350,000.00
8 Engsel Kuningan 3" Bh 10,000.00
9 Engsel Kuningan 4" Bh 15,000.00
10 Engsel Stainlees 3" Bh 17,000.00
11 Engsel Stainlees 4" Bh 22,000.00
12 Espagnolat Psg 150,000.00
13 Floor Drain Bh 18,000.00
14 Grendel Kuningan 3 " Bh 20,000.00
15 Grendel Kuningan 4 " Bh 25,000.00
16 Grendel Standar 3 " Bh 15,000.00
17 Grendel Standar 4 " Bh 17,500.00
18 Kait Angin Bh 15,000.00
19 Klosed Duduk Keramik Kls. I Bh 1,550,000.00
20 Klosed Jongkok Keramik Standart Bh 160,000.00
21 Kran Leding Bh 40,000.00
22 Kunci Tanam Cilinder 2 Slaag Klas I Bh 150,000.00
23 Kunci Tanam Cilinder 2 Slaag Standar Bh 145,000.00
24 Kusen Aluminium M1 62,000.00
25 Pintu Lipat besi M2 2,200,000.00
26 Rolling Door Aluminium M2 550,000.00
27 Urinoir Keramik + Asesorisnya Bh 1,500,000.00
28 Wastafel Berwarna KIA Bh 355,000.00
X KACA
1 Kaca Buram 12 mm M2 350,000.00
2 Kaca patri 5 mm M2 170,000.00
3 Kaca Ray-Band ukuran 3 mm M2 140,000.00
4 Kaca Ray-Band ukuran 5 mm M2 160,000.00
5 Kaca Bening tebal 5 mm M2 150,000.00
6 Kaca wireglassed 5 mm M2 175,000.00
1 2 3 4
3 Aspal Emulsi Kg 13,000.00
4 Bensin/Premium (Industri) Ltr 10,000.00
5 Gemuk Kg 12,000.00
6 Minyak Tanah Ltr 10,000.00
7 Minyak Bakisting Ltr 6,500.00
8 Oli Ltr 20,000.00
9 Residu Ltr 12,500.00
10 Solar (Industri) Ltr 12,000.00
1 2 3 4
3 Gorong - Gorong dia. 60 Cm x 50 cm Bh 250,000.00
4 Gorong - gorong dia. 50 Cm x 50 Cm Bh 160,000.00
5 Tutup Gorong-Gorong Dia 96 Cm Bh 185,000.00
XIV P I P A
1 Isolatif / Sealtape Bh 5,000.00
2 Knee, Tee, Sock Pipa PVC Dia. 1/2 " Bh 2,500.00
3 Knee, Tee, Sock Pipa PVC Dia. 3/4 " Bh 3,000.00
4 Lem PVC Bh 10,000.00
5 Pipa galvanis Medium A ½” (tbl. 2,2 mm) Btg 128,700.00
6 Pipa galvanis Medium A 1” (tbl. 2,2 mm) Btg 278,950.00
7 Pipa galvanis Medium A 1 ½” (tbl. 2,2 mm) Btg 418,385.00
8 Pipa galvanis Medium A 3/4” (tbl. 2,2 mm) Btg 168,025.00
9 Pipa galvanis Medium A 2” (tbl. 2,2 mm) Btg 556,325.00
10 Pipa galvanis Medium 3” (tbl. 2,3 mm) Btg 815,200.00
11 Pipa galvanis Medium 4” (tbl. 2,3 mm) Btg 939,225.00
12 Pipa galvanis Medium 6” (tbl. 3 mm) Btg 2,139,500.00
13 Pipa galvanis Medium 8” (tbl. 3,5 mm) Btg 3,987,500.00
14 Pipa galvanis Medium 10” (tbl. 6 mm) Btg 6,380,000.00
15 Pipa galvanis Medium 12” (tbl. 6,35 mm) Btg 8,250,000.00
16 Pipa galvanis Medium 16” (tbl. 6,35 mm) Btg 14,850,000.80
17 Pipa PVC Pj. 4m Ukuran 1/2" (Maspion) D Btg 28,000.00
18 Pipa PVC Pj. 4m Ukuran 3/4" (Maspion) D Btg 35,000.00
19 Pipa PVC Pj. 4m Ukuran 1" (Maspion) D Btg 45,000.00
20 Pipa PVC Pj. 4m Ukuran 1 ½" (Maspion) D Btg 50,000.00
21 Pipa PVC Pj. 4m Ukuran 2" (Maspion) D Btg 63,000.00
22 Pipa PVC Pj. 4m Ukuran 3" (Maspion) D Btg 115,000.00
23 Pipa PVC Pj. 4m Ukuran 4" (Maspion) D Btg 140,000.00
XV UTILITAS
1 Profil Tank 1100 Ltr Bh 1,325,000.00
2 Profil Tank 2200 Ltr Bh 2,650,000.00
3 Pompa Air Listrik kecil Bh 420,000.00
XVI ELEKTRICAL
1 Kabel Listrik NYM / Tanam 2 x 2,5 mm Rol 1,000,000.00
2 Kabel Listrik NYA 2,5 mm Standar PLN Rol 350,000.00
KECAMATAN
NO JENIS BAHAN DAN MATERIAL SATUAN
SERUYAN HILIR
1 2 3 4
3 Kabel Listrik NYA 4 mm Standar PLN Rol 400,000.00
4 Lampu Mercuri Bh 275,000.00
5 Lampu Pijar standar Bh 16,000.00
6 Lampu TL Bulat ( 20 Watt ) Bh 38,000.00
7 Lampu TL Bulat ( 40 Watt ) Bh 70,000.00
8 Lampu TL Panjang ( 20 Watt ) Bh 43,000.00
9 Lampu TL Panjang ( 40 Watt ) Bh 48,000.00
10 Schkelar Bh 35,000.00
11 Stop Kontak + Instalasi ( Bangunan Beton ) Bh 75,000.00
12 Stop Kontak + Instalasi ( Bangunan Kayu ) Bh 60,000.00
13 Titik Lampu + Instalasi ( Bangunan Beton ) Bh 110,000.00
14 Titik Lampu + Instalasi ( Bangunan Kayu ) Bh 75,000.00
15 Zekering Kast Lokal 1 Group Bh 50,000.00
16 Zekering Kast Lokal 2 Group Bh 95,000.00
DAFTAR HARGA UPAH KABUPATEN SERUYAN
KECAMATAN
NO. TENAGA KERJA KODE SATUAN
SERUYAN HILIR
1 2 3 4 5
1 Pekerja L.01 Orang/Hari 100,000.00
2 Tukang -
Tukang Gali Orang/Hari 100,000.00
Tukang Batu/Tembok Orang/Hari 120,000.00
Tukang Kayu Orang/Hari 130,000.00
Tukang Besi/Besi Beton Orang/Hari 120,000.00
Tukang Cat/Pelitur L.02 Orang/Hari 110,000.00
Tukang Pipa/Operator Pompa Orang/Hari 110,000.00
Tukang Penganyam Bronjong Orang/Hari 100,000.00
Tukang Tebas Orang/Hari 100,000.00
Tukang Las Orang/Hari 120,000.00
Tukang Listrik Orang/Hari 120,000.00
3 Kepala Tukang L.03 Orang/Hari 140,000.00
4 Mandor L.04 Orang/Hari 150,000.00
5 Juru Ukur L.05 Orang/Hari -
6 Pembantu Juru Ukur L.06 Orang/Hari 125,000.00
7 Ahli Alat Berat (Mekanik) L.07 Orang/Hari 110,000.00
8 Operator Alat Berat L.08 Orang/Hari 140,000.00
9 Pembantu Operator L.09 Orang/Hari 100,000.00
10 Supir Truk L.10 Orang/Hari 110,000.00
11 Kenek Truk L.11 Orang/Hari 90,000.00
12 Penjaga Malam L.12 Orang/Hari 100,000.00
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m
A TENAGA
Pekerja L.01 OH 0.750 100,000.00 75,000.000
Mandor L.04 OH 0.025 150,000.00 3,750.000
JUMLAH TENAGA KERJA 78,750.000
B BAHAN
A TENAGA
Pekerja L.01 OH 0.500 100,000.00 50,000.000
Mandor L.04 OH 0.050 150,000.00 7,500.000
JUMLAH TENAGA KERJA 57,500.000
B BAHAN
A TENAGA
Pekerja L.01 OH 0.300 100,000.00 30,000.000
Mandor L.04 OH 0.010 150,000.00 1,500.000
JUMLAH TENAGA KERJA 31,500.000
B BAHAN
Pasir urug 1.200 115,500.00 138,600.000
JUMLAH HARGA BAHAN 138,600.000
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 170,100.000
E Overhead & Profit 15% x D 25,515.000
F Harga Satuan Pekerjaan (D+E) 195,615.000
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
D
E
F
No
No
A
D
E
F
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Beton
Air
PERALATAN
Jumlah (A+B+C)
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Beton
Uraian
Uraian
PERALATAN
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
Kode
L.01
L.02
L.03
L.04
Kode
L.01
L.02
L.03
L.04
Satuan
OH
OH
OH
OH
kg
kg
Liter
Satuan
OH
OH
OH
OH
kg
kg
kg
Liter
Koefisien
1.65
0.28
0.03
0.08
Koefisien
15% x D
1.65
0.28
0.03
0.08
326.00
760.00
1,029.00
215.00
Harga Satuan
15% x D
247.00
869.00
215.00
JUMLAH HARGA BAHAN
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12±2) cm, w/c = 0,66
(Rp.)
100,000.00
130,000.00
140,000.00
150,000.00
1,375.00
97.50
250.00
Harga Satuan
100,000.00
120,000.00
140,000.00
150,000.00
1,375.00
97.50
595.00
250.00
Jumlah Harga
(Rp.)
165,000.00
35,750.00
3,920.00
12,450.00
217,120.00
339,625.00
84,727.50
53,750.00
478,102.50
695,222.50
104,283.38
799,505.88
Jumlah Harga
(Rp.)
165,000.00
33,000.00
3,920.00
12,450.00
214,370.00
448,250.00
74,100.00
612,255.00
53,750.00
1,188,355.00
1,402,725.00
210,408.75
1,613,133.75
A
D
E
F
No
No
A
D
E
F
G
A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir
TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
BAHAN
Total
Uraian
PERALATAN
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
Kode
L.01
L.02
L.03
L.04
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu kelas III
Paku 5 – 10 cm
PERALATAN
Jumlah (A+B+C)
Overhead & Profit
Uraian
L.01
L.02
L.03
L.04
Satuan
OH
OH
OH
OH
kg
kg
Satuan
OH
OH
OH
OH
m3
kg
Koefisien
0.07
0.07
0.01
0.00
Harga Satuan : 10
Koefisien
0.52
0.26
0.03
0.03
Harga Satuan
10.50
0.15
JUMLAH HARGA BAHAN
15% x D
(Rp.)
100,000.00
120,000.00
140,000.00
150,000.00
13,000.00
18,000.00
Harga Satuan
0.04
0.30
JUMLAH HARGA BAHAN
15% x D
(Rp.)
100,000.00
120,000.00
140,000.00
150,000.00
2,480,000.00
18,000.00
Jumlah Harga
(Rp.)
7,000.00
8,400.00
980.00
600.00
16,980.00
136,500.00
2,700.00
139,200.00
156,180.00
23,427.00
179,607.00
17,960.70
Jumlah Harga
(Rp.)
52,000.00
31,200.00
3,640.00
3,900.00
90,740.00
99,200.00
5,400.00
104,600.00
195,340.00
29,301.00
224,641.00
A
D
E
F
D
E
F
No
No
A.4.1.1.21 Pemasangan 1 m2 bekisting untuk sloof
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu kelas III
Paku 5 cm – 10 cm
PERALATAN
Jumlah (A+B+C)
Overhead & Profit
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu kelas III
Paku 5 cm – 12 cm
Balok kayu kelas II
Plywood tebal 4 mm
Uraian
Uraian
PERALATAN
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
Kode
L.01
L.02
L.03
L.04
Kode
L.01
L.02
L.03
L.04
Satuan
OH
OH
OH
OH
m3
kg
Satuan
OH
OH
OH
OH
m3
kg
m3
Lbr
Batang
Koefisien
Koefisien
15% x D
0.52
0.26
0.03
0.03
0.66
0.33
0.03
0.03
Harga Satuan
0.05
0.30
JUMLAH HARGA BAHAN
15% x D
0.04
0.40
0.02
0.35
2.00
JUMLAH HARGA BAHAN
100,000.00
120,000.00
140,000.00
150,000.00
2,480,000.00
18,000.00
Harga Satuan
(Rp.)
100,000.00
120,000.00
140,000.00
150,000.00
2,480,000.00
18,000.00
2,500,000.00
75,000.00
5,000.00
Jumlah Harga
(Rp.)
52,000.00
31,200.00
3,640.00
3,900.00
90,740.00
111,600.00
5,400.00
117,000.00
207,740.00
31,161.00
238,901.00
Jumlah Harga
(Rp.)
66,000.00
39,600.00
4,620.00
4,950.00
115,170.00
99,200.00
7,200.00
37,500.00
26,250.00
10,000.00
180,150.00
295,320.00
44,298.00
339,618.00
A.4.1.1.23 Pemasangan 1 m2 bekisting untuk balok
A TENAGA
Pekerja L.01 OH 0.66 100,000.00 66,000.00
Tukang Kayu L.02 OH 0.33 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.03 140,000.00 4,620.00
Mandor L.04 OH 0.03 150,000.00 4,950.00
JUMLAH TENAGA KERJA 115,170.00
B BAHAN
Kayu kelas III m3 0.04 2,480,000.00 99,200.00
Paku 5 cm – 12 cm kg 0.40 18,000.00 7,200.00
Balok kayu kelas II m 3
0.02 2,500,000.00 45,000.00
Plywood tebal 4 mm Lbr 0.35 75,000.00 26,250.00
Dolken kayu φ 8-10 cm –panj 4 m Batang 2.00 5,000.00 10,000.00
A TENAGA
Pekerja L.01 OH 0.66 100,000.00 66,000.00
Tukang Kayu L.02 OH 0.33 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.03 140,000.00 4,620.00
Mandor L.04 OH 0.03 150,000.00 4,950.00
JUMLAH TENAGA KERJA 115,170.00
B BAHAN
Kayu kelas III m3 0.04 2,480,000.00 99,200.00
Paku 5 cm – 12 cm kg 0.40 18,000.00 7,200.00
Balok kayu kelas II m3 0.02 2,500,000.00 37,500.00
Plywood tebal 9 mm Lbr 0.35 125,000.00 43,750.00
Dolken kayu galam, φ8–10cm panj 4m Batang 6.00 5,000.00 30,000.00
JUMLAH HARGA BAHAN 217,650.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 332,820.00
E Overhead & Profit 15% x D 49,923.00
F Harga Satuan Pekerjaan (D+E) 382,743.00
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
A. 4.4.1.21 Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP :4PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.30 100,000.00 30,000.00
Tukang Batu L.02 OH 0.10 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.01 140,000.00 1,400.00
Mandor L.04 OH 0.02 150,000.00 2,250.00
JUMLAH TENAGA KERJA 45,650.00
B BAHAN
HB-10 Bh 12.50 2,500.00 31,250.00
Semen Portland Kg 12.13 1,375.00 16,678.75
Pasir Pasang m3 0.39 136,500.00 52,962.00
JUMLAH HARGA BAHAN 100,890.75
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.300 100,000.00 30,000.000
Tukang Batu L.03 OH 0.150 120,000.00 18,000.000
Kepala Tukang L.03 OH 0.015 140,000.00 2,100.000
Mandor L.04 OH 0.015 150,000.00 2,250.000
JUMLAH TENAGA KERJA 52,350.00
B BAHAN
PC Kg 5.184 1,375.00 7,128.000
PP m3 0.026 136,500.00 3,549.000
JUMLAH HARGA BAHAN 10,677.00
C PERALATAN
JUMLAH HARGA ALAT
A TENAGA
Pekerja L.01 OH 0.200 100,000.00 20,000.000
Tukang Batu L.03 OH 0.100 120,000.00 12,000.000
Kepala Tukang L.03 OH 0.010 140,000.00 1,400.000
Mandor L.04 OH 0.010 150,000.00 1,500.000
JUMLAH TENAGA KERJA 34,900.000
B BAHAN
Semen PC Kg 3.250 1,375.00 4,468.750
JUMLAH HARGA BAHAN 4,468.750
C PERALATAN
JUMLAH HARGA ALAT
A TENAGA
Pekerja L.01 OH 0.25 100,000.00 25,000.00
Tukang Batu L.02 OH 0.13 120,000.00 15,600.00
Kepala tukang L.03 OH 0.01 140,000.00 1,680.00
Mandor L.04 OH 0.01 150,000.00 1,800.00
JUMLAH TENAGA KERJA 44,080.00
B BAHAN
Ubin keramik granito/setara Bh 6.25 12,000.00 75,000.00
Semen Portland Kg 9.80 1,375.00 13,475.00
Pasir pasang M3 0.05 136,500.00 6,825.00
Semen warna Kg 1.30 12,000.00 15,600.00
JUMLAH HARGA BAHAN 110,900.00
C PERALATAN
JUMLAH HARGA ALAT
A TENAGA
Pekerja L.01 OH 0.70 100,000.00 70,000.00
Tukang Batu L.02 OH 0.35 120,000.00 42,000.00
Kepala tukang L.03 OH 0.04 140,000.00 4,900.00
Mandor L.04 OH 0.04 150,000.00 5,250.00
JUMLAH TENAGA KERJA 122,150.00
B BAHAN
Ubin keramik roman/setara Bh 25.00 2,600.00 65,000.00
Semen Portland Kg 10.40 1,375.00 14,300.00
Pasir pasang M3 0.05 136,500.00 6,142.50
Semen warna Kg 1.62 12,000.00 19,440.00
JUMLAH HARGA BAHAN 104,882.50
C PERALATAN
JUMLAH HARGA ALAT
A TENAGA
Pekerja L.01 OH 0.90 100,000.00 90,000.00
Tukang Batu L.02 OH 0.45 120,000.00 54,000.00
Kepala tukang L.03 OH 0.05 140,000.00 6,300.00
Mandor L.04 OH 0.05 150,000.00 6,750.00
JUMLAH TENAGA KERJA 157,050.00
B BAHAN
Keramik artistik roman/setara Bh 20.00 3,250.00 65,000.00
Semen Portland Kg 9.30 1,375.00 12,787.50
Pasir Pasang M3 0.02 136,500.00 2,457.00
Semen warna Kg 1.94 12,000.00 23,280.00
JUMLAH HARGA BAHAN 103,524.50
C PERALATAN
A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
A TENAGA
Pekerja L.01 OH 0.100 100,000.00 10,000.000
Tukang kayu L.02 OH 0.050 130,000.00 6,500.000
Kepala tukang L.03 OH 0.005 140,000.00 700.000
Mandor L.04 OH 0.005 150,000.00 750.000
JUMLAH TENAGA KERJA 17,950.000
B BAHAN
Calsiboard Lembar 0.125 82,000.00 10,250.00
Paku skrup kg 0.110 21,000.00 2,310.00
JUMLAH HARGA BAHAN 12,560.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.050 100,000.00 5,000.000
Tukang Kayu L.02 OH 0.050 130,000.00 6,500.000
Kepala tukang L.03 OH 0.005 140,000.00 700.000
Mandor L.04 OH 0.003 150,000.00 450.000
JUMLAH TENAGA KERJA 12,650.000
B BAHAN
List gypsum m 1.050 40,000.00 42,000.000
Paku kg 0.010 21,000.00 210.000
JUMLAH HARGA BAHAN 42,210.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.200 100,000.00 20,000.00
Tukang Kayu L.03 OH 0.100 130,000.00 13,000.00
Kepala tukang L.11 OH 0.010 140,000.00 1,400.00
Mandor L.15 OH 0.001 150,000.00 150.00
JUMLAH TENAGA KERJA 34,550.00
B BAHAN
Genteng metal Bh 1.020 36,000.00 36,720.000
Paku biasa ½”-1” Kg 0.200 23,000.00 4,600.000
JUMLAH HARGA BAHAN 41,320.000
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.250 100,000.00 25,000.00
Tukang Kayu L.03 OH 0.150 130,000.00 19,500.00
Kepala tukang L.11 OH 0.015 140,000.00 2,100.00
Mandor L.15 OH 0.013 150,000.00 1,950.00
JUMLAH TENAGA KERJA 48,550.00
B BAHAN
Nok genteng metal Bh 1.100 22,000.00 24,200.00
Paku biasa ½”-1” Kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 25,350.00
C PERALATAN
A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 7.000 100,000.00 700,000.00
Tukang kayu L.03 OH 21.000 130,000.00 2,730,000.00
Kepala tukang L.03 OH 2.100 140,000.00 294,000.00
Mandor L.04 OH 0.350 150,000.00 52,500.00
JUMLAH TENAGA KERJA 3,776,500.00
B BAHAN
Balok kayu m3 1.100 6,500,000.00 7,150,000.000
Paku 10 cm Kg 1.250 20,000.00 25,000.000
Lem kayu ltr 1.000 35,000.00 35,000.000
JUMLAH HARGA BAHAN 7,210,000.000
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 10,986,500.000
E Overhead & Profit 15% x D 1,647,975.000
F Harga Satuan Pekerjaan (D+E) 12,634,475.000
A TENAGA
Pekerja L.01 OH 1.000 100,000.00 100,000.00
Tukang kayu L.03 OH 3.000 130,000.00 390,000.00
Kepala tukang L.03 OH 0.300 140,000.00 42,000.00
Mandor L.04 OH 0.050 150,000.00 7,500.00
JUMLAH TENAGA KERJA 539,500.00
B BAHAN
Papan kayu m3 0.040 11,560,000.00 462,400.000
Lem kayu ltr 0.500 35,000.00 17,500.000
JUMLAH HARGA BAHAN 479,900.000
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,019,400.000
E Overhead & Profit 15% x D 152,910.000
F Harga Satuan Pekerjaan (D+E) 1,172,310.000
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas II
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.800 100,000.00 80,000.00
Tukang kayu L.03 OH 2.400 130,000.00 312,000.00
Kepala tukang L.03 OH 0.240 140,000.00 33,600.00
Mandor L.04 OH 0.040 150,000.00 6,000.00
JUMLAH TENAGA KERJA 431,600.00
B BAHAN
Papan kayu m3 0.024 3,000,000.00 72,000.00
Lem kayu ltr 0.300 35,000.00 10,500.00
JUMLAH HARGA BAHAN 82,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 514,100.00
E Overhead & Profit (Contoh 15%) 15% x D 77,115.000
F Harga Satuan Pekerjaan (D+E) 591,215.000
A TENAGA
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang kayu L.03 OH 0.100 130,000.00 13,000.00
Kepala tukang L.03 OH 0.010 140,000.00 1,400.00
Mandor L.04 OH 0.005 150,000.00 750.00
JUMLAH TENAGA KERJA 25,150.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.014 2,500,000.00 35,000.00
Reng (3 x 4) cm m3 0.057 2,500,000.00 142,500.00
Paku 5 dan 10 cm kg 0.250 18,000.00 4,500.00
JUMLAH HARGA BAHAN 182,000.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Tukang kayu L.03 OH 0.300 130,000.00 39,000.00
Kepala tukang L.03 OH 0.030 140,000.00 4,200.00
Mandor L.04 OH 0.075 150,000.00 11,250.00
JUMLAH TENAGA KERJA 69,450.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.0154 2,500,000.00 38,500.00
Paku 7 cm – 10 cm kg 0.200 18,000.00 3,600.00
JUMLAH HARGA BAHAN 42,100.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang kayu L.03 OH 0.200 130,000.00 26,000.00
Kepala tukang L.03 OH 0.020 140,000.00 2,800.00
Mandor L.04 OH 0.005 150,000.00 750.00
JUMLAH TENAGA KERJA 39,550.00
B BAHAN
Papan kayu m3 0.0108 3,000,000.00 32,400.00
Paku 5 dan 7 cm kg 0.100 18,000.00 1,800.00
JUMLAH HARGA BAHAN 34,200.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.015 100,000.00 1,500.00
Tukang kayu L.02 OH 0.150 130,000.00 19,500.00
Kepala tukang L.03 OH 0.015 140,000.00 2,100.00
Mandor L.04 OH 0.0008 150,000.00 120.00
JUMLAH TENAGA KERJA 23,220.00
B BAHAN
Kaca tebal 5 mm m2 1.100 150,000.00 165,000.000
JUMLAH HARGA BAHAN 165,000.000
C PERALATAN
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
A TENAGA
Pekerja L.01 OH 0.07 100,000.00 7,000.00
Tukang cat L.02 OH 0.01 110,000.00 990.00
Kepala tukang L.03 OH 0.01 140,000.00 840.00
Mandor L.04 OH 0.00 150,000.00 450.00
JUMLAH TENAGA KERJA 9,280.00
B BAHAN
Cat menie Kg 0.20 67,500.00 13,500.00
Plamur Kg 0.15 45,000.00 6,750.00
Cat dasar Kg 0.17 62,000.00 10,540.00
Cat penutup Kg 0.26 62,000.00 16,120.00
Kuas Bh 0.01 24,000.00 240.00
Pengencer Kg 0.03 35,000.00 1,050.00
Ampelas Lbr 0.20 7,000.00 1,400.00
JUMLAH HARGA BAHAN 49,600.00
C PERALATAN
A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
A TENAGA
Pekerja L.01 OH 0.02 100,000.00 2,000.00
Tukang cat L.02 OH 0.06 110,000.00 6,930.00
Kepala tukang L.03 OH 0.01 140,000.00 882.00
Mandor L.04 OH 0.00 150,000.00 450.00
JUMLAH TENAGA KERJA 10,262.00
B BAHAN
Plamuur Kg 0.10 50,000.00 5,000.00
Cat dasar Kg 0.10 82,500.00 8,250.00
Cat penutup Kg 0.26 82,500.00 21,450.00
JUMLAH HARGA BAHAN 34,700.00
C PERALATAN
1 2 3
I PEKERJAAN PERSIAPAN
1 Papan nama kegiatan 1.00 x 1.00 x 1.00 x 1 = 1.00 Bh
1.00 Bh
2 Pengukuran & Pemasangan Bowplank 1.00 x 1.00 x 1.00 x 1 = 1.00 Paket
1.00 Paket
3 Pembersihan lokasi 1.00 x 1.00 x 1.00 x 1 = 1.00 Paket
1.00 Paket
II PEKERJAAN TANAH
1 Pek. Galian Tanah 0.60 x 0.60 x 0.60 x 14 = 3.02 M3
3.02 M3
2 Pek. Urugan Tanah kembali 0.33 x 3.02 x 1.00 x 1 = 1.01 M3
1.01 M3
3 Pek. Urugan Pasir 0.60 x 0.60 x 0.10 x 14 = 0.50 M3
0.50 M3
III PEKERJAAN PONDASI
1 Pek. Foot Plat 1:4
a. Pek. Beton (f’c = 14,5 MPa (K 175)) 0.60 x 0.60 x 0.20 x 14 = 1.01 M3
0.15 x 0.15 x 2.30 x 14 = 0.72 M3
1.73 M3
b. Pembesian
ᴓ10 1.57 x 6.00 x 0.617 x 28 = 162.74 Kg
ᴓ10 4.00 x 2.35 x 0.617 x 14 = 81.20 Kg
ᴓ8 0.67 x 16.00 x 0.395 x 14 = 59.28 Kg
303.22 Kg
c. Bekisting 2.40 x 0.20 x 1.00 x 14 = 6.72 M2
0.60 x 2.30 x 1.00 x 14 = 19.32 M2
26.04 M2
2 Pek.Cerucuk Kayu Galam 18.00 x 14.00 x - : 4 = 63.00 Btg
63.00 Btg
IV PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas.dinding Batako 1:4 30.70 x 3.30 x 1.00 x 1 = 101.31 M2
Pengurangan :
1.35 x 3.30 x 1.00 x 1 = 4.46 M2
1.08 x 2.04 x 1.00 x 2 = 4.41 M2
0.98 x 2.04 x 1.00 x 1 = 2.00 M2
0.78 x 2.04 x 1.00 x 1 = 1.59 M2
1.11 x 1.58 x 1.00 x 2 = 3.51 M2
1.11 x 1.08 x 1.00 x 1 = 1.20 M2
0.35 x 0.20 x 1.00 x 12 = 0.84 M2
= 18.01 M2
83.30 M2
1 2 3
V PEKERJAAN BETON BERTULANG
1 Pekerjaan Sloof A1
a. Pek. Beton (f’c = 14,5 MPa (K 175)) 0.15 x 0.20 x 45.00 x 1 = 1.35 M3
1.35 M3
b. Pembesian ᴓ10 45.10 x 4.00 x 0.617 x 1 = 111.31 Kg
ᴓ8 0.70 x 301.00 x 0.395 x 1 = 83.23 Kg
194.54 Kg
c. Bekisting 0.60 x 45.00 x 1.00 x 1 = 27.00 M2
27.00 M2
2 Pekerjaan Sloof A2
a. Pek. Beton (f’c = 14,5 MPa (K 175)) 0.15 x 0.20 x 45.00 x 1 = 1.35 M3
1.35 M3
b. Pembesian ᴓ10 45.10 x 4.00 x 0.617 x 1 = 111.31 Kg
ᴓ8 0.70 x 301.00 x 0.395 x 1 = 83.23 Kg
194.54 Kg
c. Bekisting 0.60 x 45.00 x 1.00 x 1 = 27.00 M2
27.00 M2
3 Pekerjaan kolom 15/15
a. Pek. Beton (f’c = 14,5 MPa (K 175)) 0.15 x 0.15 x 3.30 x 14 = 1.04 M3
0.15 x 0.15 x 2.65 x 2 = 0.12 M3
1.16 M3
b. Pembesian ᴓ10 3.40 x 4.00 x 0.617 x 14 = 117.48 Kg
ᴓ8 0.60 x 23.00 x 0.395 x 14 = 76.31 Kg
ᴓ10 2.75 x 4.00 x 0.617 x 2 = 13.57 Kg
ᴓ8 0.60 x 19.00 x 0.395 x 2 = 9.01 Kg
216.37 Kg
c. Bekisting 0.80 x 1.00 x 3.30 x 14 = 36.96 M2
0.80 x 1.00 x 2.65 x 2 = 4.24 M2
41.20 M2
4 Pekerjaan Rink Balk 15/20
a. Pek. Beton (f’c = 14,5 MPa (K 175)) 0.15 x 0.20 x 43.50 x 1 = 1.31 M3
1.31 M3
b. Pembesian ᴓ10 43.60 x 4.00 x 0.617 x 1 = 107.60 Kg
ᴓ8 0.80 x 291.00 x 0.395 x 1 = 91.96 Kg
199.56 Kg
c. Bekisting 0.60 x 1.00 x 43.50 x 1 = 26.10 M2
26.10 M2
5 Pekerjaan Lantai Beton
a. Pek. Beton (f’c = 14,5 MPa (K 175)) 3.00 x 6.00 x 0.10 x 1 = 1.80 M3
3.00 x 7.50 x 0.10 x 1 = 2.25 M3
4.05 M3
b. Pembesian ᴓ10 3.00 x 41.00 x 0.617 x 1 = 75.89 Kg
ᴓ10 6.00 x 21.00 x 0.617 x 1 = 77.74 Kg
ᴓ10 3.00 x 51.00 x 0.617 x 1 = 94.40 Kg
ᴓ10 7.50 x 21.00 x 0.617 x 1 = 97.18 Kg
345.21 Kg
c. Bekisting 3.00 x 6.00 x 1.00 x 1 = 18.00 M2
3.00 x 7.50 x 1.00 x 1 = 22.50 M2
40.50 M2
6 Pekerjaan Dak
a. Pek. Beton (f’c = 14,5 MPa (K 175)) 3.65 x 2.25 x 0.08 x 1 = 0.66 M3
0.66 M3
b. Pembesian ᴓ8 3.65 x 16.00 x 0.395 x 1 = 23.07 Kg
ᴓ8 2.25 x 25.33 x 0.395 x 1 = 22.52 Kg
45.59 Kg
c. Bekisting 3.65 x 2.25 x 1.00 x 1 = 8.21 M2
8.21 M2
VI PEKERJAAN ATAP
1 Pek. Kuda - Kuda Gewel (Batako) 0.50 x 6.15 x 1.75 x 1 = 5.38 M2
5.38 M2
2 Pek. Rangka Atap Kayu Kelas II 0.50 x 7.60 x 4.40 x 4 = 66.88 M2
66.88 M2
3 Pek. Penutup Atap Genteng Metal 66.88 x 1.00 x 1.00 x 1 = 66.88 M2
66.88 M2
4 Pek. Nok Genteng Metal 4.40 x 1.00 x 1.00 x 4 = 17.60 M
17.60 M
5 Pek. Lisplank 3/20 Kayu Kelas II 7.60 x 2.00 x 1.00 x 4 = 60.80 M
60.80 M
VII PEKERJAAN LANTAI
1 Pasangan lantai Keramik 40x40
2.00 x 3.00 x 1.00 x 1 = 6.00 M2
1.50 x 3.00 x 1.00 x 1 = 4.50 M2
2.85 x 2.85 x 1.00 x 2 = 16.25 M2
2.85 x 2.35 x 1.00 x 1 = 6.70 M2
1.50 x 1.35 x 1.00 x 1 = 2.03 M2
35.48 M2
NO URAIAN PEKERJAAN PERHITUNGAN
1 2 3
2 Pasangan lantai keramik 20x20 km/wc 1.35 x 1.35 x 1.00 x 1 = 1.82 M2
1.82 M2
1 2 3
XII PEKERJAAN INSTALASI LISTRIK
1 Stop kontak dan instalasi 3.00 x 1.00 x 1.00 x 1 = 3.00 Ttk
3.00 Ttk
2 Titik lampu dan instalasi 6.00 x 1.00 x 1.00 x 1 = 6.00 Ttk
6.00 Ttk
3 Pasang MCB 2 group 1.00 x 1.00 x 1.00 x 1 = 1.00 Bh
1.00 Bh
4 Pasang downlight SL 18 W 6.00 x 1.00 x 1.00 x 1 = 6.00 Bh
6.00 Bh
5 Pasang saklar ganda 2.00 x 1.00 x 1.00 x 1 = 2.00 Bh
2.00 Bh
6 Pasang saklar Tunggal 2.00 x 1.00 x 1.00 x 1 = 2.00 Bh
2.00 Bh
7 Penyambungan daya listrik PLN 900Wt 1.00 x 1.00 x 1.00 x 1 = 1.00 Bh
1.00 Bh
XIII PEKERJAAN CAT-CATAN
1 Pek. Cat kilap kusen pintu dan jendela 0.20 x 5.26 x 1.00 x 1 = 1.05 M2
0.24 x 5.16 x 1.00 x 2 = 2.48 M2
0.24 x 5.36 x 1.00 x 1 = 1.29 M2
4.82 M2
2 Pek. Cat kilap pintu dan jendela 5.92 x 2.00 x 1.00 x 1 = 11.84 M2
4.96 x 1.00 x 1.00 x 2 = 9.92 M2
0.82 x 3.00 x 1.00 x 4 = 9.87 M2
31.63 M2
3 Pek. Cat dinding 200.62 x 1.00 x 1.00 x 1 = 200.62 M2
200.62 M2
4 Pek. Cat plafond 57.91 x 1.00 x 1.00 x 1 = 57.91 M2
57.91 M2
5 Pek. Cat lisplank kayu 60.80 x 0.25 x 2.00 x 1 = 30.40 M2
30.40 M2
6 Pek. Cat kolom 0.60 x 3.50 x 1.00 x 5 = 10.50 M2
10.50 M2
#REF!
11.00 x 1.00 x 0.222 x 1 = 2.44 Kg
5.90
27
162
14.7272727
(8.83)
p1
p2
DAFTAR KUANTITAS DAN HARGA
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Papan nama kegiatan 1.00 Bh Ls 300,000.00 300,000.00
2 Pengukuran & Pemasangan Bowplank 1.00 Paket Ls 500,000.00 500,000.00
3 Pembersihan lokasi 1.00 Paket Ls 460,006.86 460,006.86
Sub Total 1,260,006.86
II PEKERJAAN TANAH
1 Pek. Galian Tanah 3.02 M3 A.2.3.1.1 90,562.50 273,498.75
2 Pek. Urugan Tanah kembali 1.01 M3 A.2.3.1.9 66,125.00 66,786.25
3 Pek. Urugan Pasir 0.50 M3 A.2.3.1.11 195,615.00 97,807.50
Sub Total 438,092.50
III PEKERJAAN PONDASI
1 Pek. Foot Plat 1:4
a. Pek. Beton (f’c = 14,5 MPa (K 175)) 1.73 M3 A.4.1.1.5 1,613,133.75 2,790,721.39
b. Pembesian 303.22 Kg A.4.1.1.17 17,960.70 5,446,043.45
c. Bekisting 26.04 M2 A.4.1.1.20 224,641.00 5,849,651.64
2 Pek.Cerucuk Kayu Galam 63.00 Btg Ls 15,000.00 945,000.00
Sub Total 15,031,416.48
IV PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas.dinding Batako 1:4 83.30 M2 A. 4.4.1.21 168,521.86 14,037,871.15
2 Pek. plesteran dinding 1:5 166.62 M2 A.4.4.2.5 72,481.05 12,076,792.55
3 Pek. acian dinding 200.62 M2 A.4.4.2.27 45,274.06 9,082,882.42
4 Pek. List Dinding 0.02 M3 A.4.1.1.1a 799,505.88 15,990.12
5 Pek. Plester kasar 1:5 4.55 M3 A.4.4.2.5 72,481.05 329,788.78
6 Pek. pasangan rooster 0.84 M2 A. 4.4.1.24 650,863.20 546,725.09
Sub Total 36,090,050.10
V PEKERJAAN BETON BERTULANG
1 Pekerjaan Sloof A1
a. Pek. Beton (f’c = 14,5 MPa (K 175)) 1.35 M3 A.4.1.1.5 1,613,133.75 2,177,730.56
b. Pembesian 194.54 Kg A.4.1.1.17 17,960.70 3,494,074.58
c. Bekisting 27.00 M2 A.4.1.1.21 238,901.00 6,450,327.00
2 Pekerjaan Sloof A2
a. Pek. Beton (f’c = 14,5 MPa (K 175)) 1.35 M3 A.4.1.1.5 1,613,133.75 2,177,730.56
b. Pembesian 194.54 Kg A.4.1.1.17 17,960.70 3,494,074.58
c. Bekisting 27.00 M2 A.4.1.1.21 238,901.00 6,450,327.00
3 Pekerjaan kolom 15/15
a. Pek. Beton (f’c = 14,5 MPa (K 175)) 1.16 M3 A.4.1.1.5 1,613,133.75 1,871,235.15
b. Pembesian 216.37 Kg A.4.1.1.17 17,960.70 3,886,156.66
c. Bekisting 41.20 M2 A.4.1.1.22 339,618.00 13,992,261.60
4 Pekerjaan Rink Balk 15/20
a. Pek. Beton (f’c = 14,5 MPa (K 175)) 1.31 M3 A.4.1.1.5 1,613,133.75 2,113,205.21
b. Pembesian 199.56 Kg A.4.1.1.17 17,960.70 3,584,237.29
c. Bekisting 26.10 M2 A.4.1.1.23 348,243.00 9,089,142.30
5 Pekerjaan Lantai Beton
a. Pek. Beton (f’c = 14,5 MPa (K 175)) 4.05 M3 A.4.1.1.5 1,613,133.75 6,533,191.69
b. Pembesian 345.21 Kg A.4.1.1.17 17,960.70 6,200,213.25
c. Bekisting 40.50 M2 A.4.1.1.24 382,743.00 15,501,091.50
6 Pekerjaan Dak
a. Pek. Beton (f’c = 14,5 MPa (K 175)) 0.66 M3 A.4.1.1.5 1,613,133.75 1,064,668.28
b. Pembesian 45.59 Kg A.4.1.1.17 17,960.70 818,828.31
c. Bekisting 8.21 M2 A.4.1.1.24 382,743.00 3,142,320.03
Sub Total 92,040,815.55
No Uraian Pekerjaan Volume Analisa Harga Satuan Jumlah Harga
1 2 3 4 5 6
VI PEKERJAAN ATAP
1 Pek. Kuda - Kuda Gewel (Batako) 5.38 M2 A. 4.4.1.21 168,521.86 906,647.62
2 Pek. Rangka Atap Kayu Kelas II 66.88 M2 A.4.6.1.17 238,222.50 15,932,320.80
3 Pek. Penutup Atap Genteng Metal 66.88 M2 A.4.5.2.32 87,250.50 5,835,313.44
4 Pek. Nok Genteng Metal 17.60 M A.4.5.2.36 84,985.00 1,495,736.00
5 Pek. Lisplank 3/20 Kayu Kelas II 60.80 M A.4.6.1.21 84,812.50 5,156,600.00
Sub Total 29,326,617.86
VII PEKERJAAN LANTAI
1 Pasangan lantai Keramik 40x40 35.48 M2 A.4.4.3.35a 178,227.00 6,323,493.96
2 Pasangan lantai keramik 20x20 km/wc 1.82 M2 A.4.4.3.36 261,087.38 475,179.02
3 Pasangan dinding keramik 20x25 km/wc 4.64 M2 A.4.4.3.54a 299,660.68 1,390,425.53
Sub Total 8,189,098.51
VIII PEKERJAAN PLAFOND
1 Pekerjaan rangka plafond kayu kelas II 57.91 M2 A.4.6.1.19 128,282.50 7,428,839.58
2 Pekerjaan plafond kalsiboard 4mm 57.91 M2 A.4.5.1.7a 35,086.50 2,031,859.22
3 Pekerjaan lis plafond gypsum 104.44 M A.4.5.1.9a 63,089.00 6,589,015.16
Sub Total 16,049,713.95
IX PEKERJAAN KUSEN PINTU DAN JENDELA
1 Pek. Kusen pintu, jendela dan Ventilasi kayu kelas I 0.20 M3 A.4.6.1.1 12,634,475.00 2,526,895.00
2 Pek. Pintu panil kayu kelas I 1.40 M2 A.4.6.1.5 1,172,310.00 1,641,234.00
3 Pek. Pintu dan Jendela kaca kayu kelas II 9.74 M2 A.4.6.1.6 591,215.00 5,758,434.10
4 Pek. Pemasangan kaca 5 mm 2.60 M2 A.4.6.2.17 216,453.00 562,777.80
Sub Total 10,489,340.90
X PEKERJAAN GANTUNGAN KUNCI
1 Pasang kunci tanam 4.00 Bh Ls 145,000.00 580,000.00
2 Pasang engsel pintu 12.00 Bh Ls 15,000.00 180,000.00
3 Pasang engsel jendela 12.00 Bh Ls 10,000.00 120,000.00
4 Pasang grendel jendela 6.00 Bh Ls 20,000.00 120,000.00
5 Pasang kait angin jendela 12.00 Bh Ls 15,000.00 180,000.00
6 Handle pintu 4.00 Bh Ls 100,000.00 400,000.00
Sub Total 1,580,000.00
XI PEKERJAAN SANITASI
1 Pek. Pasangan kloset jongkok 1.00 Bh Ls 160,000.00 160,000.00
2 Pek. Pasangan bak fiberglass lapis keramik 1.00 Bh Ls 200,000.00 200,000.00
3 Pek. Pasangan floor drain 1.00 Bh Ls 18,000.00 18,000.00
4 Pek. Pasangan kran leding 1/2" 1.00 Bh Ls 40,000.00 40,000.00
5 Pek. Pasangan pipa air kotor PVC 4'' 15.00 M Ls 35,000.00 525,000.00
6 Pek. Pasangan pipa air kotor PVC 2'' 15.00 M Ls 15,750.00 236,250.00
7 Pek. Pasangan pipa air bersih PVC 3/4'' 20.00 M Ls 8,750.00 175,000.00
8 Pek. Pasang septictank & resapan kapasitas 2 m³ 1.00 Bh Ls 2,500,000.00 2,500,000.00
9 Pembuatan Sumur Bor Biasa 1.00 Bh Ls 1,000,000.00 1,000,000.00
Sub Total 4,854,250.00
XII PEKERJAAN INSTALASI LISTRIK
1 Stop kontak dan instalasi 3.00 Ttk Ls 75,000 225,000.00
2 Titik lampu dan instalasi 6.00 Ttk Ls 110,000 660,000.00
3 Pasang MCB 2 group 1.00 Bh Ls 250,000 250,000.00
4 Pasang downlight SL 18 W 6.00 Bh Ls 38,000 228,000.00
5 Pasang saklar ganda 2.00 Bh Ls 35,000 70,000.00
6 Pasang saklar Tunggal 2.00 Bh Ls 35,000 70,000.00
7 Penyambungan daya listrik PLN 900Wt 1.00 Bh Ls 3,500,000 3,500,000.00
Sub Total 5,003,000.00
No Uraian Pekerjaan Volume Analisa Harga Satuan Jumlah Harga
1 2 3 4 5 6
XIII PEKERJAAN CAT-CATAN
1 Pek. Cat kilap kusen pintu dan jendela 4.82 M2 A.4.7.1.4 67,712.00 326,371.84
2 Pek. Cat kilap pintu dan jendela 31.63 M2 A.4.7.1.4 67,712.00 2,141,730.56
3 Pek. Cat dinding 200.62 M2 A.4.7.1.10 51,706.30 10,373,317.91
4 Pek. Cat plafond 57.91 M2 A.4.7.1.10 51,706.30 2,994,311.83
5 Pek. Cat lisplank kayu 30.40 M2 A.4.7.1.4 67,712.00 2,058,444.80
6 Pek. Cat kolom 10.50 M2 A.4.7.1.10 51,706.30 542,916.15
Sub Total 18,437,093.09
TOTAL 238,789,495.80
PERLENGKAPAN K3 1 % DARI NILAI PAGU 2,387,894.96
PPN 10% 23,878,949.58
JUMLAH TOTAL 265,056,340.34
REKAPITULASI
DAFTAR KUANTITAS DAN HARGA
TOTAL HARGA
NO URAIAN PEKERJAAN
(Rp)
1 2 3
TOTAL 238,789,495.80
PERLENGKAPAN K3 1 % DARI NILAI PAGU 2,387,894.96
PPN 10% 23,878,949.58
JUMLAH TOTAL 265,056,340.34
TERBILANG :
DUA RATUS ENAM PULUH TUJUH JUTA RUPIAH
Mengetahui/Menyetujui :
KEPALA BIDANG CIPTA KARYA
DINAS PEKERJAAN UMUM & PENATAAN RUANG
KAB. SERUYAN
ILHAMSYAH, SP., MM
NIP. 19760321 200604 1 010
RENCANA ANGGARAN DAN BIAYA
PROGRAM :
KEGIATAN :
PEKERJAAN :
PEMBANGUNAN RUMAH KAUM MASJID NOR HIJRAH BAUNG TIMUR KEC. SERUYAN HILIR
LOKASI :
KABUPATEN SERUYAN
TAHUN ANGGARAN :
2020