REKAPITULASI

( RENCANA ANGGARAN BIAYA / RAB )


PEKE : RIVIEW DED PEMBANGUNAN RTH TAMAN BUNG KARNO TAHAP IV
LOKAS: KAB. BULELENG
TAHU : 2020

JUMLAH PAKET 1 PAKET 2 PAKET 3 KONTROL PAGU


NO JENIS PEKERJAAN JUMLAH DED AWAL PENYESUAIAN REAL COST PER JUMLAH PER KETERANGAN
PAGU PATUNG LOGAM PATUNG BETON KONSTRUKSI PPN 10%
PAKET PAKET
1 2 3 4 5 6 7 8 9 10 = 8+9 11

I PEKERJAAN PERSIAPAN 63,022,633.49 Rp 63,022,633.49 Rp 6,932,489.68 Rp 12,604,526.70 Rp 43,485,617.11 Rp 1,451,742,014.95 Rp 145,174,201.49 Rp 1,596,916,216.44 Paket 1
II PEKERJAAN PATUNG BUNG KARNO 882,047,461.44 Rp 859,054,981.44 Rp 859,054,981.44 Rp - Rp -
III PEKERJAAN RELIEF 585,754,543.82 Rp 585,754,543.82 Rp 585,754,543.82 Rp - Rp -
IV PEKERJAAN PATUNG SINGA AMBARA RAJA 2,573,615,163.43 Rp 2,799,758,586.28 Rp - Rp 2,799,758,586.28 Rp - Rp 3,057,244,815.13 Rp 305,724,481.51 Rp 3,362,969,296.64 Paket 2
V PEKERJAAN STAGE SINGA AMBARA RAJA 226,287,414.90 Rp 244,881,702.14 Rp - Rp 244,881,702.14 Rp -
VI PEKERJAAN WANTILAN I 1,514,149,139.11 Rp 1,553,318,803.65 Rp - Rp - Rp 1,553,318,803.65 Rp 9,116,267,164.96 Rp 911,626,716.50 Rp 10,027,893,881.46 Paket 3
VII PEKERJAAN WANTILAN II 324,907,670.50 Rp - Rp - Rp - Rp - Hilang
VIII PEKERJAAN TAMAN TYPE 1 195,402,062.01 Rp 196,632,200.41 Rp - Rp - Rp 196,632,200.41
IX PEKERJAAN TAMAN TYPE 2 179,917,834.35 Rp 189,625,880.75 Rp - Rp - Rp 189,625,880.75
X PEKERJAAN TAMAN TYPE 3 166,682,701.15 Rp 175,641,425.72 Rp - Rp - Rp 175,641,425.72
XI PEKERJAAN WATER FOUNTAIN GARDEN 2,649,404,089.08 Rp 2,625,907,004.92 Rp - Rp - Rp 2,625,907,004.92
XII PEKERJAAN JOGGING TRACK 2,129,800,644.57 Rp 1,766,178,350.26 Rp - Rp - Rp 1,766,178,350.26
XIII PEKERJAAN PAGAR 206,509,707.62 Rp 206,509,707.62 Rp - Rp - Rp 206,509,707.62
XIV PEKERJAAN PAGAR SITE ENTRANCE 443,433,608.86 Rp 454,754,952.86 Rp - Rp - Rp 454,754,952.86
XV PEKERJAAN DRAINASE 316,048,768.51 Rp 336,355,098.11 Rp - Rp - Rp 336,355,098.11
XVI PEKERJAAN HARDSCAPE 26,804,958.00 Rp 58,038,233.80 Rp - Rp - Rp 58,038,233.80
XVII PEKERJAAN GROUND TANK 224,511,376.19 Rp 220,892,656.59 Rp - Rp - Rp 220,892,656.59
XVIII PEKERJAAN PENATAAN VEGETASI 607,826,912.00 Rp 34,120,000.00 Rp - Rp - Rp 34,120,000.00 Volume Disesuaikan
PEKERJAAN MEKANIKAL ELEKTRIKAL PLUMBING
XIX 1,379,240,970.00 Rp 1,043,280,020.00 Rp - Rp - Rp 1,043,280,020.00 Volume Disesuaikan
DAN PENGADAAN BARANG
XX PEKERJAAN RENOVASI 207,660,671.10 Rp 211,527,213.18 Rp - Rp - Rp 211,527,213.18
XXI PEKERJAAN MUSHOLA 160,608,260.88 Rp - Rp - Rp - Rp - Hilang
REAL COST 15,063,636,590.99 Rp 13,625,253,995.04 Rp 1,451,742,014.95 Rp 3,057,244,815.13 Rp 9,116,267,164.96 Rp 13,625,253,995.04
PPN 10% 1,506,363,659.10 Rp 1,362,525,399.50 Rp 145,174,201.49 Rp 305,724,481.51 Rp 911,626,716.50 Rp 1,362,525,399.50
JUMLAH 16,570,000,250.09 Rp 14,987,779,394.54 Rp 1,596,916,216.44 Rp 3,362,969,296.64 Rp 10,027,893,881.46 Rp 14,987,779,394.54
XXI BOP KEGIATAN RTH TBK TAHAP IV Rp 250,482,000.00 Sesuai Tabel Biaya Konstruksi Rp. 15.050.000.000 (PermenPUPR no.22 Th. 2018) Rp 250,482,000.00 Rp 250,482,000.00
XXII PENGAWASAN KEGIATAN RTH TBK TAHAP IV Rp 652,438,000.00 Sesuai Tabel Biaya Konstruksi Rp. 15.050.000.000 (PermenPUPR no.22 Th. 2018) Rp 652,438,000.00 Rp 652,438,000.00
XXIII PEMBAYARAN DED PEMBANGUNAN RTH TBK TAHAP IV Rp 27,863,000.00 Rp 27,863,000.00 Rp 27,863,000.00
JUMLAH Rp 930,783,000.00 Rp 930,783,000.00 Rp 930,783,000.00
JUMLAH TOTAL Rp 15,918,562,394.54 Rp 15,918,562,394.54 Rp 15,918,562,394.54
DIBULATKAN 16,570,000,000.00 Rp 15,918,500,000.00 Rp 15,918,500,000.00 Rp 15,918,500,000.00

TERBILANG : #NAME?

Denpasar, 1 Mei 2020


Dibuat Oleh:
Konsultan Perencana
PT. MITRA TRI SAKTI

I NYOMAN SUASANA,SE.
DIREKTUR UTAMA
TIME SCHEDULE
PEKERJAAN RIVIEW DED PEMBANGUNAN RTH TAMAN BUNG KARNO TAHAP IV
LOKASI KAB. BULELENG
TAHUN 2020
BULAN
NO JENIS PEKERJAAN JUMLAH HARGA BOBOT
I II III IV Chart Title
V VI VII VIII

I PEKERJAAN PERSIAPAN Rp 63,022,633 0.46 0.46


II PEKERJAAN PATUNG BUNG KARNO Rp 859,054,981 6.23 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78
III PEKERJAAN RELIEF Rp 585,754,544 4.25 1.06 1.06 1.06 1.06
IV PEKERJAAN PATUNG SINGA AMBARA RAJA Rp 2,799,758,586 20.29 2.54 2.54 2.54 2.54 2.54 2.54 2.54 2.54
V PEKERJAAN STAGE SINGA AMBARA RAJA Rp 244,881,702 1.77 0.59 0.59 0.59
VI PEKERJAAN WANTILAN I Rp 1,553,318,804 11.26 2.25 2.25 2.25 2.25 2.25
VII PEKERJAAN TAMAN TYPE 1 Rp 196,632,200 1.43 0.24 0.24 0.24 0.24 0.24 0.24
VIII PEKERJAAN TAMAN TYPE 2 Rp 189,625,881 1.37 0.23 0.23 0.23 0.23 0.23 0.23
IX PEKERJAAN TAMAN TYPE 3 Rp 175,641,426 1.27 0.21 0.21 0.21 0.21 0.21 0.21
X PEKERJAAN WATER FOUNTAIN GARDEN Rp 2,625,907,005 19.03 2.38 2.38 2.38 2.38 2.38 2.38 2.38 2.38
XI PEKERJAAN JOGGING TRACK Rp 1,766,178,350 12.80 2.13 2.13 2.13 2.13 2.13 2.13
XII PEKERJAAN PAGAR Rp 206,509,708 1.50 0.50 0.50 0.50
XIII PEKERJAAN PAGAR SITE ENTRANCE Rp 454,754,953 3.30 1.10 1.10 1.10
XIV PEKERJAAN DRAINASE Rp 336,355,098 2.44 0.81 0.81 0.81
XV PEKERJAAN HARDSCAPE Rp 58,038,234 0.42 0.21 0.21
XVI PEKERJAAN GROUND TANK Rp 220,892,657 1.60 0.80 0.80
XVII PEKERJAAN PENATAAN VEGETASI Rp 34,120,000 0.25 0.25
PEKERJAAN MEKANIKAL ELEKTRIKAL PLUMBING DAN
XVIII Rp 1,043,280,020 7.56 1.51 1.51 1.51 1.51 1.51
PENGADAAN BARANG
XIX PEKERJAAN RENOVASI Rp 211,527,213 1.53 0.51 0.51 0.51
XX PEKERJAAN RUMAH GENZET Rp 173,211,216 1.26 0.63 0.63

100.00
RENCANA MINGGU INI (%) 6.15 9.10 12.16 16.03 17.05 16.07 15.78 7.66
KOMULATIF RENCANA (%) 6.15 15.25 27.41 43.44 60.49 76.56 92.34 100.00

Menyetujui:
PEJABAT PEMBUAT KOMITMEN
(PPK)

PUTU SETYAWATI, ST., MT


NIP. 19730114 200003 2 005
RENCANA ANGGARAN BIAYA / RAB
PEKERJAAN : RIVIEW DED PEMBANGUNAN RTH TAMAN BUNG KARNO TAHAP IV
LOKASI : KAB. BULELENG
TAHUN : 2020

KODE
NO URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
ANALISA

1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN
1 Pek. Pengukuran 47.00 m A.8 Rp 82,726.40 Rp 3,888,140.80
2 Pek. Pembersihan dan Pematangan site 464.77 m2 O.56 Rp 21,730.00 Rp 10,099,492.69
3 Pek. Papan nama proyek 1.00 Ls Dihit Rp 350,000.00 Rp 350,000.00
4 Biaya penyelenggaraan SMK 3 Kontruksi 1.00 Ls O.42 Rp 48,685,000.00 Rp 48,685,000.00

TOTAL 63,022,633.49
II PEKERJAAN PATUNG BUNG KARNO
A PEKERJAAN PERSIAPAN
1 Pek.Pengukuran & Pemasangan bowpank 31.00 m A.8 Rp 82,726.40 Rp 2,564,518.40

B PEKERJAAN STRUKTUR
1 Pek. Angker patung d 22 262.79 kg G.14 Rp 11,997.22 Rp 3,152,781.12
2 Pek. Pengelasan 32.00 ttk O.81 Rp 46,641.00 Rp 1,492,512.00
3 Pek. Beton K 250 3.52 m3 G.8 Rp 1,092,377.82 Rp 3,845,169.92

C PEKERJAAN PATUNG PERUNGGU


1 Pek. Lanjutan patung bung karno 1.00 set O.57 Rp 848,000,000.00 Rp 848,000,000.00

TOTAL 859,054,981.44
III PEKERJAAN RELIEF
A PEKERJAAN. PERSIAPAN
1 Pek.Pengukuran & Pemasangan bowpank 64.00 m A.8 Rp 82,726.40 Rp 5,294,489.60

B PEK. RELIEF PERUNGGU


1 Pek. Relief Nomor 5,7,8,11,13,14,15 dan 17 8.00 Bh O.82 Rp 41,500,000.00 Rp 332,000,000.00
2 Pek. Relief Nomor 1,2 dan 3 3.00 Bh O.83 Rp 72,200,000.00 Rp 216,600,000.00
3 Pek. Finishing 23.04 m2 O.59 Rp 63,838.05 Rp 1,470,828.67
4 Pek. Baut angker D10 112.00 bh O.84 Rp 21,000.00 Rp 2,352,000.00
5 Pek. Border Batu Palimanan 7.20 m2 O.58 Rp 395,588.90 Rp 2,848,240.08
6 Pek. Coating tempelan 23.04 m2 O.60 Rp 30,383.05 Rp 700,025.47
7 Pek. Waterprofing clear 83.20 m2 L.8 Rp 70,100.00 Rp 5,832,320.00

D PEKERJAAN MEP
1 Pek. Instalasi Titik Lampu Spot 16.00 Titik O.12 Rp 761,300.00 Rp 12,180,800.00
2 Pekerjaan Lampu Sorot 150 Watt 16.00 Bh O.14 Rp 404,740.00 Rp 6,475,840.00

TOTAL 585,754,543.82
IV PEKERJAAN PATUNG SINGA AMBARA RAJA
A PEKERJAAN. PERSIAPAN
1 Pek.Pengukuran & Pemasangan bowpank 26.00 m A.8 Rp 82,726.40 Rp 2,150,886.40

B PEKERJAAN. TANAH
1 Pek. Galian pondasi telapak 6.40 m3 B.2 Rp 98,460.00 Rp 630,144.00
2 Pek. Urugan pasir 1.22 m3 B.10 Rp 214,550.00 Rp 261,793.91
3 Pek. Bore pile ø 30 48.00 m O.24 Rp 503,550.10 Rp 24,170,404.70
4 Pek. Pondasi batu kali 10.53 m3 C.2 Rp 978,594.00 Rp 10,300,582.58
5 Pek. Urugan tanah kembali 2.13 m3 B.9 Rp 130,310.00 Rp 277,994.67

C PEKERJAAN. STRUKTUR
1 Pek. Perkuatan tulangan d 22 334.46 kg G.14 Rp 11,997.22 Rp 4,012,630.51

2 Pek. Fotplate
Beton K250 3.20 m3 G.8 Rp 1,092,377.82 Rp 3,495,609.02
Pek. Pembesian d 16 631.81 kg G.14 Rp 11,997.22 Rp 7,579,939.57
Pek. Begesting batako 12.80 m2 D.1 Rp 97,689.80 Rp 1,250,429.44

3 Pek. Sloof 20 / 25 cm
Beton K 250 1.37 m3 G.8 Rp 1,092,377.82 Rp 1,493,280.48
Pek. Tulangan pokok 172.74 kg G.14 Rp 11,997.22 Rp 2,072,355.48
Pek. Tulangan sengkang 122.01 kg G.14 Rp 11,997.22 Rp 1,463,787.00
Pek. Begesting 2 kali pakai 13.67 m2 G.16 Rp 285,375.80 Rp 3,901,087.19

4 Pek. Kolom K1 50 x 50 cm
Beton K250 35.00 m3 G.8 Rp 1,092,377.82 Rp 38,233,223.67
Pek. Tulangan pokok 6689.27 kg G.14 Rp 11,997.22 Rp 80,252,610.24
Pek . Tulangan sengkang 575.87 kg G.14 Rp 11,997.22 Rp 6,908,799.09
Pek. Begesting 2 kali pakai 140.00 m2 G.17 Rp 229,223.30 Rp 32,091,262.00
KODE
NO URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
ANALISA

1 2 3 4 5 6 7
5 Pek. Kolom K2 40 x40 cm
Beton K250 1.98 m3 G.8 Rp 1,092,377.82 Rp 2,167,277.59
Pek. Tulangan pokok 444.36 kg G.14 Rp 11,997.22 Rp 5,331,066.25
Pek . Tulangan sengkang 51.01 kg G.14 Rp 11,997.22 Rp 611,922.21
Pek. Begesting 2 kali pakai 19.84 m2 G.17 Rp 229,223.30 Rp 4,547,790.27

6 Pek. Kolom K3 30 x 30 cm
Beton K250 0.83 m3 G.8 Rp 1,092,377.82 Rp 904,488.83
Pek. Tulangan pokok 329.69 kg G.14 Rp 11,997.22 Rp 3,955,307.22
Pek . Tulangan sengkang 37.84 kg G.14 Rp 11,997.22 Rp 454,006.80
Pek. Begesting 2 kali pakai 11.04 m2 G.17 Rp 229,223.30 Rp 2,530,625.23

7 Pek. Balok B1 40 x 70 cm
Beton K 250 13.72 m3 G.8 Rp 1,092,377.82 Rp 14,987,423.68
Pek. Tulangan pokok 2926.55 kg G.14 Rp 11,997.22 Rp 35,110,516.98
Pek. Tulangan sengkang 533.46 kg G.14 Rp 11,997.22 Rp 6,400,015.39
Pek. Begesting 2 kali pakai 88.20 m2 G.18 Rp 355,358.55 Rp 31,342,624.11

8 Pek. Balok B2 25 x 40 cm
Beton K 250 1.40 m3 G.8 Rp 1,092,377.82 Rp 1,529,328.95
Pek. Tulangan pokok 334.46 kg G.14 Rp 11,997.22 Rp 4,012,630.51
Pek. Tulangan sengkang 90.64 kg G.14 Rp 11,997.22 Rp 1,087,395.63
Pek. Begesting 2 kali pakai 14.70 m2 G.18 Rp 355,358.55 Rp 5,223,770.69

9 Pek. Balok B3 25 x 40 cm
Beton K 250 0.45 m3 G.8 Rp 1,092,377.82 Rp 491,570.02
Pek. Tulangan pokok 80.63 kg G.14 Rp 11,997.22 Rp 967,330.57
Pek. Tulangan sengkang 29.68 kg G.14 Rp 11,997.22 Rp 356,049.90
Pek. Begesting 2 kali pakai 4.73 m2 G.18 Rp 355,358.55 Rp 1,679,069.15

10 Pek. Balok BM1 40 x 70 cm


Beton K 250 4.31 m3 G.8 Rp 1,092,377.82 Rp 4,710,333.16
Pek. Tulangan pokok 459.89 kg G.14 Rp 11,997.22 Rp 5,517,366.95
Pek. Tulangan sengkang 168.59 kg G.14 Rp 11,997.22 Rp 2,022,600.28
Pek. Begesting 2 kali pakai 27.72 m2 G.18 Rp 355,358.55 Rp 9,850,539.01

11 Pek. Balok BM2 25 x 40 cm


Beton K 250 1.54 m3 G.8 Rp 1,092,377.82 Rp 1,682,261.84
Pek. Tulangan pokok 275.93 kg G.14 Rp 11,997.22 Rp 3,310,420.17
Pek. Tulangan sengkang 99.62 kg G.14 Rp 11,997.22 Rp 1,195,172.89
Pek. Begesting 2 kali pakai 16.17 m2 G.18 Rp 355,358.55 Rp 5,746,147.75

12 Pek. Kolom praktis 15 x 15 cm 10.00 m O.46 Rp 97,781.96 Rp 977,819.60


13 Pek. Sloof praktis 15 / 20 cm 22.00 m O.47 Rp 106,886.36 Rp 2,351,499.92

D PEKERJAAN ARSITEKTUR
1 Pek. Pembongkaran patung exsisting 176.40 m3 A.1 Rp 1,458,629.00 Rp 257,302,155.60
2 Pek. Lanjutan Patung Singa Ambara Raja 1.00 Ls O.85 Rp 1,033,000,000.00 Rp 1,033,000,000.00
2 Pek. Ukiran tembok stage patung 67.50 m2 O.62 Rp 4,532,535.00 Rp 305,946,112.50
3 Pek. Gayor belakang singa ambara raja 154.85 m2 O.62 Rp 4,532,535.00 Rp 701,863,044.75
4 Pek. Aling aling belakang 1.00 unit O.63 Rp 23,538,961.94 Rp 23,538,961.94

E PEKERJAAN MEP
1 Pek. Instalasi Titik Lampu (NYFGBY 3 x 4 mm2) 8.00 Titik O.12 761,300.00 6,090,400.00
2 Pek. Instalasi Stop Kontak 15.00 Titik O.26 349,700.00 5,245,500.00
3 Pek. Lampu Spot 1000 Watt 6.00 Bh O.16 1,664,740.00 9,988,440.00
4 Pek. Lampu Spot 3000 Watt 2.00 Bh O.17 31,164,740.00 62,329,480.00
5 Pek. Stop Kontak Weather Proof 15.00 Bh O.25 70,220.00 1,053,300.00
6 Air Terminal (R = 150 m) + Tiang Pipa GIP 2 m (Grounding System, Bak Kontrol) 1.00 Set O.36 11,800,000.00 11,800,000.00

TOTAL 2,799,758,586.28
V PEKERJAAN STAGE SINGA AMBARA RAJA
A PEKERJAAN PERSIAPAN
1 Pek, pengukuran & pemasangan bowplank 132.00 m A.8 Rp 82,726.40 Rp 10,919,884.80
2 Pek. Pembongkaran Beton Stage Lama 5.65 m3 A.1 Rp 1,458,629.00 Rp 8,244,171.11
3 Pek. Galian Tanah 45.22 m3 B.1 Rp 80,075.00 Rp 3,620,671.20

B PEKERJAAN STRUKTUR
1 Pek. Beton Stage K 250 5.65 m3 G.8 Rp 1,092,377.82 Rp 6,174,119.43
2 Pekerjaan Pembesian wiremash m8 1 layer 308.03 kg G.14 Rp 11,997.22 Rp 3,695,551.67
3 Pekerjaan Bekisting batako 2.80 m2 D.1 Rp 97,689.80 Rp 273,531.44

C PEKERJAAN ARSITEKTUR
1 Pek. Tempelan lantai floor hardener 973.35 m2 Q.27 Rp 90,934.80 Rp 88,511,387.58
2 Pek. Tempelan dinding batu candi 192.40 m2 O.29 Rp 417,588.90 Rp 80,344,104.36
3 Pek. Coating tempelan 1165.75 m2 O.60 Rp 30,383.05 Rp 35,419,040.54

E PEKERJAAN MEP
1 Pekerjaan Instalasi Lampu 6.00 Titik O.12 Rp 761,300.00 Rp 4,567,800.00
2 Pekerjaan Lampu Sorot 150 Watt 6.00 Bh O.14 Rp 404,740.00 Rp 2,428,440.00
3 Pekerjaan Galian Lubang Biopori 10.00 Titik O.76 Rp 5,000.00 Rp 50,000.02
4 Pekerjaan Pipa Biopori 4" (1 Meter) 10.00 Bh P.18 Rp 57,800.00 Rp 578,000.00
5 Pekerjaan Dop Pipa Biopori 10.00 Bh P.19 Rp 5,500.00 Rp 55,000.00

TOTAL 244,881,702.14
BACK UP DATA

NO. PERHITUNGAN

1 2
NO.
URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN
1 Pek. Pengukuran
2 Pek. Pembersihan dan Pematangan site
3 Pek. Papan nama proyek
4 Biaya penyelenggaraan SMK 3 Kontruksi

II PEKERJAAN PATUNG BUNG KARNO


A PEKERJAAN PERSIAPAN
1 Pek.Pengukuran & Pemasangan bowpank

B PEKERJAAN STRUKTUR
1 Pek. Angker patung d 22
2 Pek. Pengelasan
3 Pek. Beton K 250

C PEKERJAAN PATUNG PERUNGGU


1 Pek. Lanjutan patung bung karno

D PEKERJAAN MEP
1 Pek. Instalasi Titik Lampu Spot
2 Pek Lampu Spot 400 W

III PEKERJAAN RELIEF


A PEKERJAAN. PERSIAPAN
1 Pek.Pengukuran & Pemasangan bowpank
B PEK. RELIEF PERUNGGU
1 Pek. Relief Nomor 5,7,8,11,13,14,15 dan 17
2 Pek. Relief Nomor 1,2 dan 3
3 Pek. Finishing
4 Pek. Baut angker D10
5 Pek. Border Batu Palimanan
6 Pek. Coating tempelan
7 Pek. Waterprofing clear

D PEKERJAAN MEP
1 Pek. Instalasi Titik Lampu Spot
2 Pekerjaan Lampu Sorot 150 Watt

IV PEKERJAAN PATUNG SINGA AMBARA RAJA


A PEKERJAAN. PERSIAPAN
1 Pek.Pengukuran & Pemasangan bowpank
2 Pek. Bongkaran

B PEKERJAAN. TANAH
1 Pek. Galian pondasi telapak
2 Pek. Urugan pasir
3 Pek. Bore pile ø 30
4 Pek. Pondasi batu kali
5 Pek. Urugan tanah kembali

C PEKERJAAN. STRUKTUR
1 Pek. Perkuatan tulangan d 22

2 Pek. Fotplate
Beton K250
Pek. Pembesian d 16
Pek. Begesting batako

3 Pek. Sloof 20 / 25 cm
Beton K 250
Pek. Tulangan pokok
Pek. Tulangan sengkang
Pek. Begesting 2 kali pakai

4 Pek. Kolom K1 50 x 50 cm
Beton K250
Pek. Tulangan pokok
Pek . Tulangan sengkang
Pek. Begesting 2 kali pakai

5 Pek. Kolom K2 40 x40 cm


Beton K250
Pek. Tulangan pokok
Pek . Tulangan sengkang
Pek. Begesting 2 kali pakai

6 Pek. Kolom K3 30 x 30 cm
Beton K250
Pek. Tulangan pokok
Pek . Tulangan sengkang
Pek. Begesting 2 kali pakai

7 Pek. Balok B1 40 x 70 cm
Beton K 250
Pek. Tulangan pokok
Pek. Tulangan sengkang
Pek. Begesting 2 kali pakai

8 Pek. Balok B2 25 x 40 cm
Beton K 250
Pek. Tulangan pokok
Pek. Tulangan sengkang
Pek. Begesting 2 kali pakai

9 Pek. Balok B3 25 x 40 cm
Beton K 250
Pek. Tulangan pokok
Pek. Tulangan sengkang
Pek. Begesting 2 kali pakai

10 Pek. Balok BM1 40 x 70 cm


Beton K 250
Pek. Tulangan pokok
Pek. Tulangan sengkang
Pek. Begesting 2 kali pakai
11 Pek. Balok BM2 25 x 40 cm
Beton K 250
Pek. Tulangan pokok
Pek. Tulangan sengkang
Pek. Begesting 2 kali pakai

12 Pek. Kolom praktis 15 x 15 cm


13 Pek. Sloof praktis 15 / 20 cm

D PEKERJAAN ARSITEKTUR
1 Pek. Pembongkaran patung exsisting
2 Pek. Lanjutan Patung Singa Ambara Raja
2 Pek. Ukiran tembok stage patung
3 Pek. Gayor belakang singa ambara raja
4 Pek. Aling aling belakang

E PEKERJAAN MEP
1 Pek. Instalasi Titik Lampu (NYFGBY 3 x 4 mm2)
2 Pek. Instalasi Stop Kontak
3 Pek. Lampu Spot 1000 Watt
4 Pek. Lampu Spot 3000 Watt
5 Pek. Stop Kontak Weather Proof
6 Air Terminal (R = 150 m) + Tiang Pipa GIP 2 m (Grounding System, Bak Kontrol)

XIII PEKERJAAN PAGAR


A PEKERJAAN. PERSIAPAN
1 Pek. Pengukuran & pemasangan bowpank

B PEKERJAAN TANAH
1 Pek. Galian pondasi menerus
2 Pek. Urugan pasir
3 Pek. Pas. Batu Kali
4 Pek. Urugan tanah kembali
C PEKERJAAN STRUKTUR
1 Pek. Kolom praktis
2 Pek. Sloof praktis
3 Pek. Ring praktis

D PEKERJAAN ARSITEKTUR
1 Pek. Pas. Dinding batako
2 Pek. Plesteran
3 Pek. Acian
4 Pek. Pengecatan

XIV PEKERJAAN PAGAR SITE ENTRANCE


A PEKERJAAN PERSIAPAN
1 Pek. Pengukuran & Pemasangan bowplang

B PEKERJAAN TANAH
1 Pek. Galian tanah menerus
2 Pek. Galian tanah setempat
3 Pek. Urugan pasir
4 Pek. Urugan tanah kembali

C PEKERJAAN STRUKTUR
1 Pek. Sloof 20 / 25 cm
Beton K 250
Pek. Tulangan pokok
Pek. Tulangan sengkang
Pek. Begesting 2 kali pakai

2 Pek. Kolom 20 x 20 cm
Beton K 250
Pek. Tulangan pokok
Pek. Tulangan Sengkang
Pek. Begesting 2 kali pakai

3 Pek. Plat pintu masuk


Beton K 250
Pek. Tulangan pokok
Pek. Tulangan bagi
Pek. Begesting 2 kali pakai

4 Pek. Ram difabel


Beton K 175
Pek. Tulangan pokok
Pek.begesting

D PEKERJAAN ARSITEKTUR
D.1 PEKERJAAN PLANTER BOX
1 Pek. Galian tanah menerus
2 Pek. Pas kanstin
2 Pek. Pas. Batako
3 Pek. Plesteran
4 Pek. Acian
5 Pek. Pengecatan
6 Pek. Gril besi hollow

D.2 PEKERJAAN CANDI BENTAR


1 Pek. Candi bentar paras sangsit
2 Pek. Pengeresek
3 Pek. Pintu Lipat Lebar 5 m
4 Pek. Coating tempelan

D.3 PEKERJAAN PENUTUP LANTAI


1 Pek. Tempelan batu Candi
2 Pek. Pegangan ram stainlees

E PEKERJAAN RUMAH KOMPOS


E.1 PEK. PERSIAPAN
1 Pek Pengukuran dan pemasangan bowplank

E.2 PEKERJAAN TANAH


1 Pek. Galian tanah menerus
2 Pek. Urugan pasir
3 Pek. Pondasi batu kali

E.3 PEKERJAAN STRUKTUR


1 Pek. Kolom praktis
2 Pek. Sloof praktis
3 Pek. Ring praktis

E.4 PEKERJAAN ARSITEKTUR


1 Pek. Pas. Bata merah

E.5 PEKERJAAN ATAP


1 Pek. Rangka kanopi holoow 4 x 4 cm
2 Pek. Atap Spandek

E.7 PEKERJAAN PENATAAN


1 Pek. Urugan pasir
2 Pek. Pas kanstin
3 Pek. Pasangan paving

E.8 PEKERJAAN MEP


1 Pekerjaan Instalasi Titik Lampu
2 Pekerjaan Instalasi Stop Kontak
3 Pekerjaan Lampu SL
4 Pekerjaan Stop Kontak
5 Pekerjaan Lampu Kapal
6 Pekerjaan Saklar Ganda

XIV PEKERJAAN STAGE SINGA AMBARA RAJA


A PEKERJAAN PERSIAPAN
1 Pek, pengukuran & pemasangan bowplank
2 Pek. Pembongkaran Beton Stage Lama
3 Pek. Galian Tanah

B PEKERJAAN STRUKTUR
1 Pek. Beton Stage K 250
2 Pekerjaan Pembesian wiremash m8 1 layer
3 Pekerjaan Bekisting batako

C PEKERJAAN ARSITEKTUR
1 Pek. Tempelan lantai floor hardener
2 Pek. Tempelan dinding batu candi
3 Pek. Coating tempelan
XX PEKERJAAN RENOVASI
A PEKERJAAN PERSIAPAN
1 Pek. Pembersihan lahan

B PEKERJAAN RENOVASI KIOS


1 Pek. Kolom Balok Kayu
2 Pek. Usuk Exspose
3 Pek. Atap Ex. Alderon
4 Pek. Polituran
5 Pek. Pengecetan dinding
6 Pek. Pengcatan Plafond

C PEKERJAAN RENOVASI KM/ WC


1 Pek. Waterprofing
2 Pek. Pengecetan
3 Pek. Plafond Gypsum rangka hollow

D PEKERJAAN KAWASAN
1 Pek. Pengecetan monumen
2 Pek. Pengecatan Bangunan Pengelola
3 Pek. Petunjuk In dan Out pintu masuk

E PEKERJAAN MEP
1 Pekerjaan Instalasi Lampu
2 Pekerjaan Lampu Sorot 150 Watt
3 Pekerjaan Galian Lubang Biopori
4 Pekerjaan Pipa Biopori 4" (1 Meter)
5 Pekerjaan Dop Pipa Biopori
PERHITUNGAN

3
PANJANG X LEBAR X TINGGI X BJ BESI X

47.000
11.000 X 42.252

8.000 x 7.500

11.000 x 8.000 x 2.986

2.000 x 0.800 x 2.200

8.000 x 8.000
8.000 x 2.400 x 1.200
8.000 x 14.000
9.000 x 0.100 x 8.000
8.000 x 2.400 x 1.200
8.000 x 1.300 x 8.000

26.000
4.000 x 2.000 x 1.500

2.000 x 1.000 x 0.800 x


2.000 x 1.000 x 0.050 x
6.000 x
27.340 x 0.550 x 0.700

7.000 x 8.000 x x 2.986 x

2.000 x 1.000 x 0.400 x


40.000 x 2.500 1.580 x
8.000 x 0.400 x

27.340 x 0.200 x 0.250


27.340 x 4.000 x 1.580
219.720 x 0.900 x 0.617
27.340 x 0.500

17.500 x 0.500 x 0.500 x


17.500 x 16.000 x 2.986 x
116.667 x 0.617 x
17.500 x 2.000 x

6.200 x 0.400 x 0.400 x


6.200 x 12.000 x 2.986 x
41.333 x 0.617 x
6.200 x 1.600 x

4.600 x 0.300 x 0.300 x


4.600 x 12.000 x 2.986 x
30.667 x 0.617 x
4.600 x 1.200 x

49.000 x 0.400 x 0.700


49.000 x 20.000 x 2.986
393.000 x 2.200 x 0.617
49.000 x 1.800 x

14.000 x 0.250 x 0.400


14.000 x 8.000 x 2.986
113.000 x 1.300 x 0.617
14.000 x 1.050 x

4.500 x 0.250 x 0.400


4.500 x 6.000 x 2.986
37.000 x 1.300 x 0.617
4.500 x 1.050 x

15.400 x 0.400 x 0.700


15.400 x 10.000 x 2.986
124.200 x 2.200 x 0.617
15.400 x 1.800 x
15.400 x 0.250 x 0.400
15.400 x 6.000 x 2.986
124.200 x 1.300 x 0.617
15.400 x 1.050 x

31.500 x 7.000 x 0.800

25.000 x 1.000 x 2.700


25.000 x 19.000 x 0.326

System, Bak Kontrol)

83.000

26.000 x 0.600 x 0.500


26.000 x 0.600 x 0.050
26.000 x 0.400 x 1.100
2.500 x 20.750
83.000

166.000 x 2.500

138.200

138.200 x 0.500 x 0.400


1.000 x 1.000 x 0.600 x
1.000 x 1.000 x 0.050 x

138.200 x 0.200 x 0.250


138.200 x 4.000 x 1.043
1,106.600 x 0.900 x 0.617
138.200 x 0.500

4.000 x 0.200 x 0.200 x


4.000 x 4.000 x 1.043 x
26.667 x 0.800 0.617 x
4.000 x 0.800 x

6.000 x 3.000 x 0.300


30.000 x 3.000 x 1.043
20.000 x 6.000 x 1.043
18.000

3.000 x 3.000 x 0.500


15.000 x 3.000 x 1.043
3.000

138.200 x 0.200 x 0.150


138.200
138.200 x 3.100

276.400

3.000 x 0.200

3.000 x 2.000

5.000 x 2.700
10.000

10.000 x 5.000

10.000 x 5.000 x 0.500 x 0.500


30.000 0.050 x 0.500
30.000 x 0.700 x 0.500

4.000 x 12.000
30.000
30.000
30.000 x 2.000

50.000
50.000

25.000 x 15.000 x 0.050


80.000
15.000 x 10.000

132.000
0.100 56.520
0.800 56.520

0.100 56.520
56.520 5.450
14.000 0.200

37.000 x 6.190 x
37.000 x 0.400 x
12.000 x 6.000

5.000 x 0.150 x 0.150 x


51.700 x 10.610 x
51.700 x 10.610
567.000 x 0.200
51.700 x 3.500 x
51.700 x 3.000

11.200 x 8.000 x
9.600 x 6.400 x
9.600 x 6.400 x

5.500 x 15.000
32.000 x 3.500
VOLUME

4
JUMLAH X LUAS - TOTAL = HASIL =

47.000 47.000
464.772 464.772
1.000 1.000
1.000 1.000

-
-
31.000 31.000

-
262.793 262.793
32.000
3.520
-
-
1.000

-
-
-
64.000
-
-
1.000
1.000
23.040
112.000
7.200
23.040
83.200

-
-
26.000
12.000
-
-
4.000 6.400
4.000 1.220
8.000 48.000
10.526
2.133
-
-
2.000 334.463
-
-
4.000 3.200
4.000 631.808
4.000 12.800
-
-
1.367
172.736
122.011
13.670
-
-
8.000 35.000
8.000 6,689.267
8.000 575.867
4.000 140.000

-
2.000 1.984
2.000 444.358
2.000 51.005
2.000 19.840

-
2.000 0.828
2.000 329.685
2.000 37.843
2.000 11.040
-
-
13.720
2,926.554
533.458
88.200

-
1.400
334.463
90.637
14.700

-
0.450
80.630
29.678
4.725

-
4.312
459.887
168.589
27.720
-
1.540
275.932
99.621
16.170

10.000
22.000
-
-
176.400
1.000
67.500
154.850
1.000

-
-
-
83.000
-
-
7.800
0.780
11.440
2.600
-
-
51.875
83.000
83.000
-
-
415.000
830.000
830.000
830.000
-
-
-
-
138.200
-
-
27.640
4.000 2.400
4.000 0.200
4.607
-
-
-
6.910
576.421
614.495
69.100
-
-
4.000 0.640
4.000 66.735
4.000 52.651
2.000 6.400
-
-
5.400
93.846
125.128
18.000
-
-
4.500
2.000 93.846
3.000
-
-
-
4.146
138.200
428.420

-
-
1.000
1.200
1.000
12.000
-
-
13.500
10.000

15.000

7.500
0.750
10.500

48.000
30.000
30.000
60.000

50.000
50.000

18.750
80.000
150.000

-
-
-
132.000
5.652
45.216

5.652
308.034
2.800
-
-
2.000 + 515.290 973.350
13.000 192.400
1,165.750
-
-
-
-
-
18.000
-
-
4.000 0.450
109.707
548.537
113.400
2.000 361.900
155.100
-
-
2.000 179.200
2.000 122.880
2.000 122.880
-
-
82.500
112.000
1.000
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
VOLUME Sat

5
REAL

47.00 m
464.77 m2
1.00 Ls
1.00 Ls

-
-
31.00 m

-
262.79 kg
32.00 ttk
3.52 m3
-
-
1.00 set

12.00 Titik
12.00 Bh

-
-
-
64.00 m
-
-
8.00 Bh
3.00 Bh
23.04 m2
112.00 bh
7.20 m2
23.04 m2
83.20 m2

16.00 Titik
16.00 Bh

-
-
26.00 m
12.00 m3
-
-
6.40 m3
1.22 m3
48.00 m
10.53 m3
2.13 m3
-
-
334.46 kg
-
-
3.20 m3
631.81 kg
12.80 m2
-
-
1.37 m3
172.74 kg
122.01 kg
13.67 m2
-
-
35.00 m3
6,689.27 kg
575.87 kg
140.00 m2

-
1.98 m3
444.36 kg
51.01 kg
19.84 m2

-
0.83 m3
329.69 kg
37.84 kg
11.04 m2
-
-
13.72 m3
2,926.55 kg
533.46 kg
88.20 m2

-
1.40 m3
334.46 kg
90.64 kg
14.70 m2

-
0.45 m3
80.63 kg
29.68 kg
4.73 m2

-
4.31 m3
459.89 kg
168.59 kg
27.72 m2
-
1.54 m3
275.93 kg
99.62 kg
16.17 m2

10.00 m
22.00 m
-
-
176.40 m3
1.00 Ls
67.50 m2
154.85 m2
1.00 unit

8.00 Titik
15.00 Titik
6.00 Bh
2.00 Bh
15.00 Bh
1.00 Set

-
-
-
83.00 m
-
-
7.80 m3
0.78 m3
11.44 m3
2.60 m3
-
-
51.88 m
83.00 m
83.00 m
-
-
415.00 m2
830.00 m2
830.00 m2
830.00 m2
-
-
-
-
138.20 m
-
-
27.64 m3
2.40 m3
0.20 m3
4.61 m3
-
-
-
6.91 m3
576.42 kg
614.49 kg
69.10 m2
-
-
0.64 m3
66.73 kg
52.65 kg
6.40 m2
-
-
5.40 m3
93.85 kg
125.13 kg
18.00 m2
-
-
4.50 m3
93.85 kg
3.00 m2
-
-
-
4.15 m3
138.20 m
428.42 m2
428.42 m2
428.42 m2
428.42 m2
276.40 m

6.00 Titik
6.00 Bh

-
-
1.00 Set
1.20 m3
1.00 Unit
12.00 m2
-
-
13.50 m2
10.00 m

15.00 m

7.50 m3
0.75 m3
10.50 m3

48.00 m
30.00 m
30.00 m
60.00 m2

50.00 m2
50.00 m2

18.75 m2
80.00 m
150.00

8.00 Titik
2.00 Titik
8.00 Bh
2.00 Bh
6.00 Bh
1.00 Bh

-
-
-
132.00 m
5.65 m3
45.22 m3

5.65 m3
308.03 kg
2.80 m2
-
-
973.35 m2
192.40 m2
1,165.75 m2
-
-
-
-
-
18.00 m
-
-
0.45 m3
109.71 m2
548.54 m2
113.40 m2
361.90 m2
155.10 m2
-
-
179.20 m2
122.88 m2
122.88 m2
-
-
165.00 m2
112.00 m2
1.00 Ls
-
-
-
6.00 Titik
6.00 Bh
10.00 Titik
10.00 Bh
10.00 Bh
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KODE JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN (Rp)
ANALISA (Rp)

1 2 3 4 5 6 7

VI PEKERJAAN WANTILAN I
A. PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bowplank 52.00 m A.8 Rp 82,726.40 Rp 4,301,772.80

B. PEKERJAAN TANAH
1 Galian Tanah Pondasi foot plat 150 X 150 X 200 CM 63.00 m3 B.2 Rp 98,460.00 Rp 6,202,980.00
2 Galian Tanah Pondasi menerus 80 X 90 cm 34.56 m3 B.1 Rp 80,075.00 Rp 2,767,392.00
3 Urugan tanah peninggi lantai 40.50 m3 B.9 Rp 130,310.00 Rp 5,277,555.00
4 Urugan Kembali Ex. Galian 32.52 m3 B.8 Rp 58,650.00 Rp 1,907,298.00
5 Pasir Urug Bawah lantais t.5 cm 6.75 m3 B.10 Rp 214,550.00 Rp 1,448,212.50
6 Pasir Urug Bawah Pondasi menerus t.5 cm 2.16 m3 B.10 Rp 214,550.00 Rp 463,428.00
7 Lantai Kerja Bawah foot plat t. 10 cm 4.32 m3 G.5 Rp 1,014,345.06 Rp 4,381,970.65
8 pek. Pas. Pondasi menerus 14.40 m3 C.3 Rp 892,850.10 Rp 12,857,041.44
9 pek. Pas. Pondasi menerus tangga 46.98 m3 C.3 Rp 892,850.10 Rp 41,946,097.70
10 pek. Pas.batu kosong Pondasi menerus 8.64 m3 C.1 Rp 511,311.30 Rp 4,417,729.63

C. PEKERJAAN STRUKTUR
1 Pekerjaan pasangan foot plat 150 x 150 x 40 cm
- Besi D 16 - 150 574.95 kg G.14 Rp 11,997.22 Rp 6,897,745.01
- Cor Beton K-250 12.60 m3 G.8 Rp 1,092,377.82 Rp 13,763,960.52
2 SLOOF S1 (30 X 40 CM)
- Besi D16 - 8 1326.80 kg G.14 Rp 11,997.22 Rp 15,917,873.10
- Tulangan sengkang Ø10 - 150 cm 674.57 kg G.14 Rp 11,997.22 Rp 8,092,917.91
- Begisting 2 kali pakai 84.00 m2 G.16 Rp 142,687.90 Rp 11,985,783.60
- Cor Beton K-250 12.60 m3 G.8 Rp 1,092,377.82 Rp 13,763,960.52
3 RABATAN LANTAI t 10 Cm
- Besi M = 6 (1 Layer) 414.45 kg G.14 Rp 11,997.22 Rp 4,972,247.83
- Cor Beton K-250 13.50 m3 G.8 Rp 1,092,377.82 Rp 14,747,100.56
4 KOLOM K1 (35 X 35 CM)
- Besi D16 - 8 1211.81 kg G.14 Rp 11,997.22 Rp 14,538,324.10
- Tulangan sengkang Ø10 - 150 cm 626.60 kg G.14 Rp 11,997.22 Rp 7,517,464.29
- Begisting 2 kali pakai 134.26 m2 G.16 Rp 142,687.90 Rp 19,157,277.45
- Cor Beton K-250 11.75 m3 G.8 Rp 1,092,377.82 Rp 12,832,981.52
5 KOLOM K2 (30 x 30 CM)
- Besi D16 - 8 216.08 kg G.14 Rp 11,997.22 Rp 2,592,339.33
- Tulangan sengkang Ø10 - 150 cm 61.68 kg G.14 Rp 11,997.22 Rp 739,932.38
- Begisting 2 kali pakai 13.68 m2 G.16 Rp 142,687.90 Rp 1,951,970.47
- Cor Beton K-250 1.54 m3 G.8 Rp 1,092,377.82 Rp 1,681,169.46
6 BALOK SUNDUK (20 X 35 CM)
- Besi D16 - 8 677.30 kg G.14 Rp 11,997.22 Rp 8,125,695.22
- Tulangan sengkang Ø10 - 150 cm 265.19 kg G.14 Rp 11,997.22 Rp 3,181,501.98
- Begisting 2 kali pakai 53.60 m2 G.16 Rp 142,687.90 Rp 7,648,071.44
- Cor Beton K-250 3.75 m3 G.8 Rp 1,092,377.82 Rp 4,098,601.58
7 BALOK RB 1 (30 X 45 CM)
- Besi D16 - 11 833.99 kg G.14 Rp 11,997.22 Rp 10,005,520.24
- Tulangan sengkang Ø10 - 150 cm 332.56 kg G.14 Rp 11,997.22 Rp 3,989,831.47
- Begisting 2 kali pakai 57.60 m2 G.16 Rp 142,687.90 Rp 8,218,823.04
- Cor Beton K-250 6.48 m3 G.8 Rp 1,092,377.82 Rp 7,078,608.27
8 BALOK RB 2 (30 X 50 CM)
- Besi D16 - 11 416.99 kg G.14 Rp 11,997.22 Rp 5,002,760.12
- Tulangan sengkang Ø10 - 150 cm 178.62 kg G.14 Rp 11,997.22 Rp 2,142,961.43
- Begisting 2 kali pakai 31.20 m2 G.16 Rp 142,687.90 Rp 4,451,862.48
- Cor Beton K-250 3.60 m3 G.8 Rp 1,092,377.82 Rp 3,932,560.15
9 BALOK RB 3 (30 X 40 CM)
- Besi D16 - 9 341.18 kg G.14 Rp 11,997.22 Rp 4,093,167.37
- Tulangan sengkang Ø10 - 150 cm 154.81 kg G.14 Rp 11,997.22 Rp 1,857,233.24
- Begisting 2 kali pakai 26.40 m2 G.16 Rp 142,687.90 Rp 3,766,960.56
- Cor Beton K-250 2.88 m3 G.8 Rp 1,092,377.82 Rp 3,146,048.12
10 BALOK RB 4 (20 X 35 CM)
- Besi D16 - 7 68.55 kg G.14 Rp 11,997.22 Rp 822,423.44
- Tulangan sengkang Ø10 - 150 cm 31.22 kg G.14 Rp 11,997.22 Rp 374,555.61
- Begisting 2 kali pakai 5.58 m2 G.16 Rp 142,687.90 Rp 796,198.48
- Cor Beton K-250 0.43 m3 G.8 Rp 1,092,377.82 Rp 474,091.97
11 BALOK MIRING BM1 (30 x 55 CM)
- Besi D16 - 17 2142.78 kg G.14 Rp 11,997.22 Rp 25,707,365.06
- Tulangan sengkang Ø10 - 150 cm 684.30 kg G.14 Rp 11,997.22 Rp 8,209,725.96
- Begisting 2 kali pakai 111.72 m2 G.16 Rp 142,687.90 Rp 15,941,092.19
- Cor Beton K-250 13.17 m3 G.8 Rp 1,092,377.82 Rp 14,383,338.74
12 BALOK MIRING BM2 (20 x 45 CM)
- Besi D16 - 12 955.29 kg G.14 Rp 11,997.22 Rp 11,460,868.64
- Tulangan sengkang Ø10 - 150 cm 358.65 kg G.14 Rp 11,997.22 Rp 4,302,800.07
- Begisting 2 kali pakai 55.44 m2 G.16 Rp 142,687.90 Rp 7,910,617.18
- Cor Beton K-250 4.54 m3 G.8 Rp 1,092,377.82 Rp 4,955,025.79
KODE JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN (Rp)
ANALISA (Rp)

1 2 3 4 5 6 7
13 PEKERJAAN ATAP
Pek. Pasangan usuk 5/7 cm di profil 3.50 m3 O.69 Rp 7,521,390.00 Rp 26,324,865.00
Pek. Pasangan usuk gerantang 5/7 cm di profil 1.40 m3 O.69 Rp 7,521,390.00 Rp 10,529,946.00
Pek. Pasangan usuk 5/7 cm atap atas di profil 1.22 m3 O.69 Rp 7,521,390.00 Rp 9,161,053.02
Pek. Pasangan usuk gerantang 5/7 cm atap atas di profil 0.84 m3 O.69 Rp 7,521,390.00 Rp 6,317,967.60
pek. Pas. Gording balok 8/15 cm di profil 3.79 m3 O.69 Rp 9,600,000.00 Rp 36,403,200.00
pek. Pas. angker Ø 10 18.51 kg O.84 Rp 21,000.00 Rp 388,710.00
Pek. Pasangan usuk gording 5/7 cm di profil 1.11 m3 O.69 Rp 7,521,390.00 Rp 8,318,657.34
Pek. Pasangan tatab (3x16 cm) di profil 0.30 m3 O.70 Rp 10,474,740.00 Rp 3,097,171.12
Pek. Pasangan tatab (3x18 cm) di profil 0.86 m3 O.70 Rp 10,474,740.00 Rp 9,004,924.48
Pek. Pasangan papan (3x14 cm) di profil 0.15 m3 O.70 Rp 10,474,740.00 Rp 1,583,780.69
Pek. Pasangan papan (3x12 cm) di profil 0.13 m3 O.70 Rp 10,474,740.00 Rp 1,357,526.30
Pek. Pasangan papan (3x10 cm) di profil 0.59 m3 O.70 Rp 10,474,740.00 Rp 6,134,007.74
Pek. Pasangan papan (3x8 cm) di profil 2.34 m3 O.70 Rp 10,474,740.00 Rp 24,536,030.98
Pek. Pasangan papan 3x20 0.04 m3 O.70 Rp 10,474,740.00 Rp 382,118.52
Pek pasangan reng 4 x 6 cm 4.37 m3 O.70 Rp 10,474,740.00 Rp 45,739,298.96
Pek. Pasangan dedeleg 1.00 bh O.91 Rp 3,400,000.00 Rp 3,400,000.00
Pek. Pasangan lambrizering 370.62 m2 O.71 Rp 431,911.00 Rp 160,074,854.82
Pek. Pasangan atap karang pilang 370.62 m2 K.9 Rp 143,267.40 Rp 53,097,763.79
Pek. Pasangan bubungan gentengkarang pilang 43.60 m K.10 Rp 239,154.80 Rp 10,427,149.28
Pek. Pasangan ikut celedu paras 8.00 bh O.67 Rp 278,712.37 Rp 2,229,698.96
Pek. Pasangan murda Paras 2.00 bh O.66 Rp 168,712.37 Rp 337,424.74

D. PEKERJAAN ARSITEK
1 Pek. Pasangan dinding bata merah 184.45 m2 D.7 Rp 196,314.45 Rp 36,210,121.78
2 Pek. Pasangan kusen 5/15 cm 2.34 m3 J.1 Rp 15,523,865.00 Rp 36,260,643.87
3 Pek. Pasangan daun pintu 8.65 m2 J.5 Rp 745,384.00 Rp 6,449,509.60
4 Pek. Pasangan Daun ventilasi + Kaca Bening 5 mm 8.50 m2 J.5 Rp 745,384.00 Rp 6,334,124.16
5 Pek. Pasangan kait angin 32.00 set J.6 Rp 56,752.90 Rp 1,816,092.80
6 Pek. Pasangan kunci komplit 3.00 set J.6 Rp 56,752.90 Rp 170,258.70
7 Pek. Pasangan engsel 32.00 set O.30 Rp 58,230.00 Rp 1,863,360.00
8 Pek.pasangan grendel 32.00 set O.32 Rp 46,852.90 Rp 1,499,292.80
9 Pek pasangan door closer 3.00 set O.103 Rp 245,052.90 Rp 735,158.70
10 Pek. Pasangan engsel pintu 9.00 set O.32 Rp 46,852.90 Rp 421,676.10
11 Pek. Pasangan plesteran 368.90 m2 E.4 Rp 68,182.14 Rp 25,152,336.90
12 Pek. Pasangan acian 368.90 m2 E.15 Rp 41,545.25 Rp 15,326,009.49
13 Pek. Pengecetan
Pek. Pengecetan tembok 368.90 m2 L.1 Rp 36,942.05 Rp 13,627,892.69
Pek. Pengecetan balok 352.10 m2 L.1 Rp 36,942.05 Rp 13,007,295.81
14 Pek. Polituran
Pek. Polituran kusen 17.97 m2 L.3 Rp 66,186.00 Rp 1,189,627.16
Pek. Pulituran daun pintu 8.65 m2 L.3 Rp 66,186.00 Rp 572,680.98
Pek. Polituran ventilasi 8.50 m2 L.3 Rp 66,186.00 Rp 562,435.39
Pek. Polituran lambrizering 370.62 m2 L.3 Rp 66,186.00 Rp 24,529,855.32
Pek. Polituran tatab (3x16 cm) 23.41 m2 L.3 Rp 66,186.00 Rp 1,549,281.89
Pek. Polituran tatab (3x18 cm) 66.86 m2 L.3 Rp 66,186.00 Rp 4,425,460.70
Pek. Polituran Papan (3x14 cm) 12.24 m2 L.3 Rp 66,186.00 Rp 810,116.64
Pek. Polituran Papan (3x12 cm) 10.80 m2 L.3 Rp 66,186.00 Rp 714,808.80
Pek. Polituran Papan (3x10 cm) 50.75 m2 L.3 Rp 66,186.00 Rp 3,359,071.87
Pek. Polituran Papan (3x8 cm) 21.47 m2 L.3 Rp 66,186.00 Rp 1,421,145.79
Pek. Polituran Papan (3x20 cm) 2.80 m2 L.3 Rp 66,186.00 Rp 185,109.00
15 Pek. Pasangan lantai keramik 60 x 60 cm ex. Granito 135.00 m2 F.5 Rp 430,628.00 Rp 58,134,780.00
16 Pek. Tempelan Tangga Batu Candi 13.44 m2 O.29 Rp 417,588.90 Rp 5,612,394.82
17 Pek. Tempelan kolom Batu Palimanan 46.20 m2 O.58 Rp 395,588.90 Rp 18,276,207.18
18 Pek. Tempelan sendi kolom Batu Candi 107.52 m2 O.29 Rp 417,588.90 Rp 44,899,158.53

E. PEKERJAAN MEP
1 Pekerjaan Pasangan Elektrikal
Pek. Box MCB 1.00 unit O.77 Rp 750,439.00 Rp 750,439.00
Pek. Pas. Lampu SpotLight 60.00 unit O.14 Rp 404,740.00 Rp 24,284,400.00
Pek. Pas. Lampu SpotLight 6.00 unit O.14 Rp 404,740.00 Rp 2,428,440.00
Pek. Pas. Saklar Single 6.00 unit O.22 Rp 46,220.00 Rp 277,320.00
Pek. Pas. Saklar Doble 6.00 unit O.23 Rp 49,550.00 Rp 297,300.00
Pek. Pas. Stop Kontak 6.00 unit O.8 Rp 42,000.00 Rp 252,000.00

2 Pekerjaan Instalasi Elektrikal


Pek. Instalasi Lampu Spotlight 60.00 Titik O.14 Rp 404,740.00 Rp 24,284,400.00
Pek. Instalasi Lampu Spotlight 6.00 Titik O.14 Rp 404,740.00 Rp 2,428,440.00
Pek. Instalasi Stop Kontak 6.00 Titik O.26 Rp 349,700.00 Rp 2,098,200.00
Air Terminal (R = 150 m) + Tiang Pipa GIP 2 m (Grounding System, Bak Kontrol) 1.00 Set O.36 Rp 11,800,000.00 Rp 11,800,000.00
KODE JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN (Rp)
ANALISA (Rp)

1 2 3 4 5 6 7
F. PEKERJAAN PATUNG BUNG KARNO & SUNGKEM
1 Pedestal patung
Pek. Pasangan batako 15.00 m2 D.1 Rp 97,689.80 Rp 1,465,347.00
Pek. Beton k 250 9.00 m3 G.8 Rp 1,092,377.82 Rp 9,831,400.37
Pek. Pembesian wiremash m 10 51.06 kg G.14 Rp 11,997.22 Rp 612,578.05
Pek. Tempelan granit hitam 21.00 m2 O.73 Rp 735,213.90 Rp 15,439,491.90
Pek. Pagar Rantai stainlees 18.00 m O.74 Rp 389,600.00 Rp 7,012,800.00

2 Patung Bung Karno dan Sungkem Tembaga 1.00 Ls O.90 Rp 220,000,000.00 Rp 220,000,000.00

G. PEKERJAAN FOTO DINDING BUNGKARNO


1 Pek. Foto (74x54 cm) + Frame Bingkai 30.00 Bh O.104 Rp 520,000.00 Rp 15,600,000.00

H. PEKERJAAN LAIN LAIN


1 Pek. Panel kayu kamper ukir 8 x 100 cm 24.00 m1 O.72 Rp 1,792,768.00 Rp 43,026,432.00
2 Pek. Tiang Jaro kayu kamper ukir 8 x 100 cm 32.00 bh O.72a Rp 356,403.84 Rp 11,404,922.88
3 Pek. Roster Paras Ukir 25x25 cm 44.00 Bh O.102 Rp 65,000.00 Rp 2,860,000.00

TOTAL 1,553,318,803.65
KODE HARGA JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN
ANALISA SATUAN (Rp) (Rp)

1 2 3 4 5 6 7

VII PEKERJAAN WANTILAN ALIT II


1 PEKERJAAN WANTILAN ALIT II
A PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bowplank 44.00 m1 A.8 82,726.40 3,639,961.60

B PEKERJAAN TANAH & PONDASI


1 Galian Tanah Pondasi menerus 36.00 m3 B.1 80,075.00 2,882,700.00
2 Pek. Urugan Pasir Bawah Pondasi Menerus 2.25 m3 B.10 214,550.00 482,737.50
3 Pek. Pas. Batu Kosong 9.00 m3 C.1 511,311.30 4,601,801.70
4 Pek. Pas. Batu Kali 16.58 m3 C.3 892,850.10 14,798,990.41
5 Urugan Kembali Ex. Galian 12.00 m3 B.8 58,650.00 703,800.00
6 Pek. Urugan Tanah Peninggian Lantai 12.80 m3 B.9 130,310.00 1,667,968.00
7 Pek. Pas. Batako 31.20 m2 D.1 97,689.80 3,047,921.76
8 Pek Urugan Pasir Lantai 5.60 m3 B.10 214,550.00 1,201,480.00
9 Pek. Rabatan Lantai 5.60 m3 G.1 907,336.41 5,081,083.92

C PEKERJAAN STRUKTUR
1 Pek. Sloof 15 x 25
Tulangan Pokok 4 D10 148.08 kg G.14 11,997.22 1,776,548.34
Sengkang Ø8 - 150 cm 132.96 kg G.14 11,997.22 1,595,103.53
Begisting 3 x Pakai 15.00 m2 G.16 95,125.27 1,426,879.00
Beton K-175 2.25 m3 G.5 1,014,345.06 2,282,276.38
2 Pek. Kolom 20 x 20
Tulangan Pokok 4 D13 141.81 kg G.14 11,997.22 1,701,341.12
Sengkang Ø8 - 150 cm 55.68 kg G.14 11,997.22 667,982.17
Begisting 3 x Pakai 20.40 m2 G.17 229,223.30 4,676,155.32
Beton K-175 1.36 m3 G.5 1,014,345.06 1,379,509.28
3 Pek. Balok 15 x 25
Tulangan Pokok 4 D10 34.55 kg G.14 11,997.22 414,527.95
Sengkang Ø8 - 150 cm 31.24 kg G.14 11,997.22 374,733.26
Begisting 3 x Pakai 3.50 m2 G.18 236,905.70 829,169.95
Beton K-175 0.53 m3 G.5 1,014,345.06 532,531.16
4 Pek. Atap
Pek. Atap Baja Ringan C 187.00 m2 K.7 202,167.00 37,805,229.00
Pek. Genteng Plentong 215.93 m2 O.49 90,767.40 19,599,313.98
Pek. Bubungan Plentong 34.00 m O.50 130,654.80 4,442,263.20
Pek. Murda paras ukir 2.00 bh O.67 278,712.37 557,424.74
Pek. Ikut celedu paras ukir 4.00 bh O.66 168,712.37 674,849.48
Pek. Listplank kayu kamper 56.00 m1 O.51 136,220.48 7,628,346.88

D PEKERJAAN ARSITEKTUR
1 Pek. Plesteran 34.60 m2 E.5 67,249.56 2,326,834.78
2 Pek. Acian 34.60 m2 E.15 41,545.25 1,437,465.65
3 Pek. Plafond Rangka Hollow 112.00 m2 I.10 115,645.00 12,952,240.00
4 Pek. Plafond Gypsum 112.00 m2 I.2 50,738.30 5,682,689.60
5 Pek. List Plafond Gypsum 50.00 m1 I.3 34,092.90 1,704,645.00
6 Pek. Pengecatan 146.60 m2 L.1 36,942.05 5,415,704.53
7 Pek.Pas. Kramik 40 x 40 Polish 112.00 m2 O.12 249,505.00 27,944,560.00
8 Pek.Pas. Kramik 40 x 40 Unpolish 33.00 m2 O.13 255,505.00 8,431,665.00
KODE HARGA JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN
ANALISA SATUAN (Rp) (Rp)

1 2 3 4 5 6 7

E PEKERJAAN M.E.P
1 Pek. Pas. Box MCB 1.00 unit O.77 750,439.00 750,439.00
2 Pek. Instalasi Titik Lampu 2.00 unit O.4 187,950.00 375,900.00
3 Pek. Instalasi Stop Kontak 1.00 unit O.4 187,950.00 187,950.00
4 Saklar Single Broco 1.00 bh O.9 31,500.00 31,500.00
5 Stop
LampuKontak Broco
Downlight 1.00 bh O.8 42,000.00 42,000.00
6 2.00 bh O.5 91,927.50 183,855.00

PEKERJAAN RUANG PENYIMPANAN


2
DAN TOILET
A PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bowplank 20.00 m1 A.8 82,726.40 1,654,528.00

B PEKERJAAN TANAH & PONDASI


1 Galian Tanah Pondasi menerus 14.70 m3 B.1 80,075.00 1,177,102.50
2 Pek. Urugan Pasir Bawah Pondasi Menerus 0.92 m3 B.10 214,550.00 197,117.81
3 Pek. Pas. Batu Kosong 3.68 m3 C.1 511,311.30 1,879,069.03
4 Pek. Pas. Batu Kali 6.77 m3 C.3 892,850.10 6,042,921.08
5 Urugan Kembali Ex. Galian 4.90 m3 B.8 58,650.00 287,385.00
8 Pek Urugan Pasir Lantai 1.05 m3 B.10 214,550.00 225,277.50
9 Pek. Rabatan Lantai 1.05 m3 G.1 907,336.41 952,703.24

C PEKERJAAN STRUKTUR
1 Pek. Sloof 15 x 25
Tulangan Pokok 4 D10 60.47 kg G.14 11,997.22 725,423.90
Sengkang Ø8 - 150 cm 54.45 kg G.14 11,997.22 653,296.04
Begisting 3 x Pakai 6.13 m2 G.16 95,125.27 582,642.26
Beton K-175 0.92 m3 G.5 1,014,345.06 931,929.52
2 Pek. Kolom 15 x 15
Tulangan Pokok 4 D10 88.85 kg G.14 11,997.22 1,065,929.00
Sengkang Ø8 - 150 cm 59.23 kg G.14 11,997.22 710,619.34
Begisting 3 x Pakai 21.60 m2 G.17 229,223.30 4,951,223.28
Beton K-175 1.35 m3 G.5 1,014,345.06 1,369,365.83
3 Pek. Balok 15 x 25
Tulangan Pokok 4 D10 60.47 kg G.14 11,997.22 725,423.90
Sengkang Ø8 - 150 cm 54.45 kg G.14 11,997.22 653,296.04
Begisting 3 x Pakai 6.13 m2 G.18 236,905.70 1,451,047.41
Beton K-175 0.92 m3 G.5 1,014,345.06 931,929.52
4 Pek. Plat Washtafel
Pek. Beton K175 0.08 m3 G.5 1,014,345.06 76,075.88
Pek. Wiremash m6 1 layer 2.30 kg G.14 11,997.22 27,623.60
Bekisting Plat 3x pakai 0.75 m2 G.19 382,823.30 287,117.48
5 Pek. Plat Atap
Pek. Beton K175 3.70 m3 G.5 1,014,345.06 3,749,019.33
Pek. Wiremash m6 1 layer 113.47 kg G.14 11,997.22 1,361,290.96
Bekisting Plat 2x pakai 36.96 m2 G.19 574,234.95 21,223,723.75

D PEKERJAAN ARSITEKTUR
1 Pek. Pas. Dinding Bata Merah ( 1/2 Bata ) 66.30 m2 D.10 189,201.30 12,544,235.39
2 Pek. Plesteran 132.60 m2 E.5 67,249.56 8,917,426.16
3 Pek. Acian 132.60 m2 E.15 41,545.25 5,508,983.24
4 Pekerjaan Pengecatann tembok 132.60 m2 L.1 36,942.05 4,898,589.71
KODE HARGA JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN
ANALISA SATUAN (Rp) (Rp)

1 2 3 4 5 6 7

5 Pek. Pintu PG1


Pek. Kusen Pintu Kamper 0.03 m3 J.2 13,765,485.00 460,868.44
Pek. Daun Pintu Kamper 4.84 m2 O.52 690,757.60 3,341,885.27
Pek. Pas. Engsel Pintu 6.00 bh O.30 58,230.00 349,380.00
Pek. Pas. Kait Angin 2.00 set O.31 56,752.90 113,505.80
Pek. Pas. Handle Pintu 1.00 set O.17 329,872.70 329,872.70
Pek. Plituran Kusen Pintu 1.23 m2 L.3 66,186.00 81,249.93
Pek. Plituran Daun Pintu 9.68 m2 L.3 66,186.00 640,415.74
6 Pek. Pintu P1
Pek. Kusen Pintu Kamper 0.06 m3 J.2 13,765,485.00 847,403.26
Pek. Daun Pintu Kamper 2.99 m2 O.52 690,757.60 2,067,437.50
Pek. Pas. Engsel Pintu 6.00 bh O.30 58,230.00 349,380.00
Pek. Pas. Handle Pintu 2.00 set O.17 329,872.70 659,745.40
Pek. Plituran Kusen Pintu 2.26 m2 L.3 66,186.00 149,395.04
Pek. Plituran Daun Pintu 5.99 m2 L.3 66,186.00 396,189.40
7 Pekerjaan Penutup Lantai
Pek. Kramik Lantai 40 x 40 Polish 12.00 m2 O.12 249,505.00 2,994,060.00
Pek. Kramik Lantai 40 x 40 Unpolish 6.70 m2 O.13 255,505.00 1,711,883.50
Pek. Kramik Lantai 20 x 20 Polish 0.75 m2 O.18 235,505.00 176,628.75
Pek. Kramik Lantai 20 x 20 Unpolish 4.50 m2 O.19 240,505.00 1,082,272.50
Pek. Keramik Dinding 20 x 25 25.80 m2 F.8 294,868.20 7,607,599.56
8 Pek. Rangka Hollow Profil C 36.96 m2 I.10 115,645.00 4,274,239.20
9 Pek. Plafond Gypsum 36.96 m2 I.2 50,738.30 1,875,287.57
10 Pek. List Plafond Gypsum 50.70 m2 I.3 34,092.90 1,728,510.03

E PEKERJAAN MEP
1 Pek. Box MCB 1.00 unit O.77 750,439.00 750,439.00
2 Pekerjaan Sanitari
Pek. Pas. Closet Jongkok 2.00 unit M.2 631,254.00 1,262,508.00
Pek. Pas. Washtafel 1.00 unit M.4 1,410,526.00 1,410,526.00
Pek. Pas. Kran Air 1/2 2.00 unit O.20 51,779.00 103,558.00
Pek. Pas. Floof Drain 2.00 unit M.5 102,144.00 204,288.00
3 Pekerjaan Pasangan Elektrikal
Pek. Pas. Lampu Down light 6.00 unit O.5 91,927.50 551,565.00
Pek. Pas. Saklar Single 3.00 unit O.9 31,500.00 94,500.00
Pek. Pas. Saklar Doble 1.00 unit O.9 31,500.00 31,500.00
Pek. Pas. Stop Kontak 2.00 unit O.8 42,000.00 84,000.00
4 Pekerjaan Instalasi Elektrikal
Pek. Instalasi Lampu Down light 6.00 set O.4 187,950.00 1,127,700.00
Pek. Instalasi Saklar Single 3.00 set O.4 187,950.00 563,850.00
Pek. Instalasi Saklar Doble 1.00 set O.4 187,950.00 187,950.00
Pek. Instalasi Stop Kontak 2.00 set O.4 187,950.00 375,900.00
5 Pekerjaan Pasangan Pipa
Pek. Instalasi Pipa Air Bersih 1/2" 15.00 m1 M.6 24,730.90 370,963.50
Pek. Instalasi Pipa Air Buangan 3" 15.00 m1 M.15 81,615.35 1,224,230.25
Pek. Instalasi Pipa Air kotor 4" 15.00 m1 M.16 103,586.60 1,553,799.00
6 Pek. Pas. Septitank dan Resapan 1.00 unit O.68 4,070,790.29 4,070,790.29

TOTAL -
KODE HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SATUAN JUMLAH HARGA (Rp)
ANALISA (Rp)

1 2 3 4 5 6 7

VIII PEKERJAAN TAMAN TYPE 1


A. PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bowplank 55.89 m A.8 Rp 82,726.40 Rp 4,623,743.95

B. PEKERJAAN TANAH
1 Galian Tanah Pondasi menerus 30 X 85 cm 15.48 m3 B.1 Rp 80,075.00 Rp 1,239,304.76
2 Pek. Urugan Pasir Malang 7.51 m3 O.55 Rp 417,030.00 Rp 3,132,228.92
3 Pasir Urug Bawah Pondasi t = 5 cm 1.14 m3 B.10 Rp 214,550.00 Rp 244,157.90
4 Pek. Pasangan Pondasi Batu Kali 15.48 m3 C.3 Rp 892,850.10 Rp 13,818,462.43
5 Pek. Pasangan Batu Kosong 4.55 m3 C.1 Rp 511,311.30 Rp 2,327,489.04

C. PEKERJAAN STRUKTUR
1 SLOOF 20/30 cm
Besi D13 - 6 284.79 kg G.14 Rp 11,997.22 Rp 3,416,693.29
Tulangan sengkang Ø8 - 150 cm 129.77 kg G.14 Rp 11,997.22 Rp 1,556,938.54
Begisting 3 x Pakai 36.42 m2 G.16 Rp 142,687.90 Rp 5,196,122.57
Cor Beton K-175 2.73 m3 G.8 Rp 1,092,377.82 Rp 2,983,502.30
2 PEKERJAAN TIANG dan DINDING SANGKAR BURUNG
Pek. Rangka Dinding Pipa Galvanis 524.32 m O.96 Rp 135,000.00 Rp 70,783,200.00
Pek. Dinding Kawat Jaring 145.36 m2 O.98 Rp 105,000.00 Rp 15,262,800.00
3 PEKERJAAN ATAP
Pek. Rangka Atap Pipa Galvanis 40.00 m O.96 Rp 135,000.00 Rp 5,400,000.00
Pek. Pasangan Atap Metal Berpasir 101.48 m2 O.97 Rp 230,000.00 Rp 23,341,504.00

D. PEKERJAAN ARSITEKTUR
1 Pek. Tempelan Batu Candi 31.86 m2 O.58 Rp 417,588.90 Rp 13,306,052.71

E. PEKERJAAN PENGADAAN SATWA


1 Pek. Pengadaan burung jalak bali + Sertifikat BKSDA 3.00 Pasang O.92 Rp 9,800,000.00 Rp 29,400,000.00

F. PEKERJAAN LAIN - LAIN


1 Pek. Tempat minum dan Makan Burung 3.00 Pasang O.94 Rp 50,000.00 Rp 150,000.00
2 Pek. Gelodok Besar 3.00 Unit O.95 Rp 150,000.00 Rp 450,000.00

TOTAL 196,632,200.41
IX PEKERJAAN TAMAN TYPE 2

A. PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bowplank 37.05 m A.8 Rp 82,726.40 Rp 3,065,178.57

B. PEKERJAAN STRUKTUR
1 Pek. Pas Kansteen 25x15 cm 61.00 m1 O.26 Rp 227,262.17 Rp 13,862,992.37
2 Pek. Beton Pengunci K175 0.16 m3 G.5 Rp 1,014,345.06 Rp 167,214.78
3 Pek. Pas. Batu Andesit Bakar 450.41 m2 O.106 Rp 383,053.90 Rp 172,530,495.02

TOTAL 189,625,880.75
KODE HARGA JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN
ANALISA SATUAN (Rp) (Rp)

1 2 3 4 5 6 7

X PEKERJAAN TAMAN TYPE 3


1 PEK. FINISHING
Pek. Pas. Batu Andesit Bakar 415.64 m2 O.106 383,053.90 159,213,617.44
Pek. Pemasangan kanstin 72.29 m1 O.26 227,262.17 16,427,808.29

TOTAL 175,641,425.72
KODE HARGA JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN
ANALISA SATUAN (Rp) (Rp)

1 2 3 4 5 6 7
XII PEKERJAAN JOGGING TRACK
XII.1 PENYAMBUNGAN
A. PEKERJAAN PERSIAPAN
1 Pek. Pas. Papan Bouplank 21.68 m' A.9 108,588.20 2,354,192.18
2 Pek. Pas. Bekisting Beton Rabat 487.80 m2 A.4 19,836.90 9,676,439.82

B. PEKERJAAN TANAH
1 Pek. Galian Tanah 596.20 m3 B.1 80,075.00 47,740,715.00
2 Pek. Urugan Tanah Kembali + Pemadatan 198.73 m3 B.9 130,310.00 25,896,940.67
3 Pek. Urugan Pasir 45.26 m3 B.10 214,550.00 9,709,889.35

C. PEKERJAAN PONDASI
1 Pek. Pas. Batu Kosong 61.79 m3 C.1 511,311.30 31,592,902.60
2 Pek. Pas. Batu Kali Campuran 1SP:3PP 125.20 m3 C.3 892,850.10 111,786,618.22

D. PEKERJAAN BETON
1 Pek. Rabatan Beton Mutu F'c =7,4 (K100), Slump (12+_ 2) cm,w/ 59.62 m3 G.1 907,336.41 54,095,397.02

XII.2 FINISHING
A. PEKERJAAN ARSITEKTUR
1 Pek. Pas. Batu Andesite Bakar t 1.3cm 3846.26 m2 O.106 383,053.90 1,473,325,255.40

TOTAL 1,766,178,350.26
RENCANA ANGGARAN BIAYA / RAB
PEKERJAAN : RIVIEW DED PEMBANGUNAN RTH TAMAN BUNG KARNO TAHAP IV
LOKASI : KAB. BULELENG
TAHUN : 2020

KODE
NO URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
ANALISA

1 2 3 4 5 6 7
XIII PEKERJAAN PAGAR
A PEKERJAAN. PERSIAPAN
1 Pek. Pengukuran & pemasangan bowpank 83.00 m A.9 Rp 108,588.20 Rp 9,012,820.60

B PEKERJAAN TANAH
1 Pek. Galian pondasi menerus 7.80 m3 B.1 Rp 80,075.00 Rp 624,585.00
2 Pek. Urugan pasir 0.78 m3 B.10 Rp 214,550.00 Rp 167,349.00
3 Pek. Pas. Batu Kali 11.44 m3 C.2 Rp 978,594.00 Rp 11,195,115.36
4 Pek. Urugan tanah kembali 2.60 m3 B.9 Rp 130,310.00 Rp 338,806.00

C PEKERJAAN STRUKTUR
1 Pek. Kolom praktis 51.88 m O.46 Rp 97,781.96 Rp 5,072,439.18
2 Pek. Sloof praktis 83.00 m O.47 Rp 106,886.36 Rp 8,871,567.88
3 Pek. Ring praktis 83.00 m O.48 Rp 107,832.80 Rp 8,950,122.40

D PEKERJAAN ARSITEKTUR
1 Pek. Pas. Dinding batako 415.00 m2 D.1 Rp 97,689.80 Rp 40,541,267.00
2 Pek. Plesteran 830.00 m2 E.4 Rp 68,182.14 Rp 56,591,176.20
3 Pek. Acian 830.00 m2 E.15 Rp 41,545.25 Rp 34,482,557.50
4 Pek. Pengecatan 830.00 m2 L.1 Rp 36,942.05 Rp 30,661,901.50

TOTAL 206,509,707.62
KODE
NO URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
ANALISA

1 2 3 4 5 6 7
XIV PEKERJAAN PAGAR SITE ENTRANCE
A PEKERJAAN PERSIAPAN
1 Pek. Pengukuran & Pemasangan bowplang 138.20 m A.9 Rp 108,588.20 Rp 15,006,889.24

B PEKERJAAN TANAH
1 Pek. Galian tanah menerus 27.64 m3 B.1 Rp 80,075.00 Rp 2,213,273.00
2 Pek. Galian tanah setempat 2.40 m3 B.1 Rp 80,075.00 Rp 192,180.00
3 Pek. Urugan pasir 0.20 m3 B.10 Rp 214,550.00 Rp 42,910.00
4 Pek. Urugan tanah kembali 4.61 m3 B.9 Rp 130,310.00 Rp 600,294.73

C PEKERJAAN STRUKTUR
1 Pek. Sloof 20 / 25 cm
Beton K 250 6.91 m3 G.8 Rp 1,092,377.82 Rp 7,548,330.73
Pek. Tulangan pokok 576.42 kg G.14 Rp 11,997.22 Rp 6,915,451.28
Pek. Tulangan sengkang 614.49 kg G.14 Rp 11,997.22 Rp 7,372,231.46
Pek. Begesting 2 kali pakai 69.10 m2 G.16 Rp 142,687.90 Rp 9,859,733.89

2 Pek. Kolom 20 x 20 cm
Beton K 250 0.64 m3 G.8 Rp 1,092,377.82 Rp 699,121.80
Pek. Tulangan pokok 66.73 kg G.14 Rp 11,997.22 Rp 800,631.12
Pek. Tulangan Sengkang 52.65 kg G.14 Rp 11,997.22 Rp 631,661.63
Pek. Begesting 2 kali pakai 6.40 m2 G.17 Rp 343,834.95 Rp 2,200,543.68

3 Pek. Plat pintu masuk


Beton K 250 5.40 m3 G.8 Rp 1,092,377.82 Rp 5,898,840.22
Pek. Tulangan pokok 93.85 kg G.14 Rp 11,997.22 Rp 1,125,887.51
Pek. Tulangan bagi 125.13 kg G.14 Rp 11,997.22 Rp 1,501,183.35
Pek. Begesting 2 kali pakai 18.00 m2 G.19 Rp 574,234.95 Rp 10,336,229.10

D PEKERJAAN ARSITEKTUR
D.1 PEKERJAAN PLANTER BOX
1 Pek. Galian tanah menerus 4.15 m3 B.1 Rp 80,075.00 Rp 331,990.95
2 Pek. Pas. Batako 428.42 m2 D.1 Rp 97,689.80 Rp 41,852,264.12
3 Pek. Plesteran 428.42 m2 E.4 Rp 68,182.14 Rp 29,210,592.42
4 Pek. Acian 428.42 m2 E.15 Rp 41,545.25 Rp 17,798,816.01
5 Pek. Pengecatan 428.42 m2 L.1 Rp 36,942.05 Rp 15,826,713.06
6 Pek. Gril besi hollow 276.40 m O.53 Rp 307,136.89 Rp 84,892,635.84

D.2 PEKERJAAN CANDI BENTAR


1 Pek. Candi bentar paras sangsit 1.00 Set O.64 Rp 48,470,402.30 Rp 48,470,402.30
2 Pek. Pengeresek 1.20 m3 G.1 Rp 907,336.41 Rp 1,088,803.70
3 Pek. Pintu Lipat Lebar 5 m 1.00 Unit O.86 Rp 14,000,000.00 Rp 14,000,000.00
4 Pek. Coating tempelan 12.00 m2 O.60 Rp 30,383.05 Rp 364,596.60

D.3 PEKERJAAN PENUTUP LANTAI


1 Pek. Tempelan batu Andesit 13.50 m2 O.29 Rp 417,588.90 Rp 5,637,450.15

E PEKERJAAN RUMAH KOMPOS


E.1 PEK. PERSIAPAN
1 Pek Pengukuran dan pemasangan bowplank 15.00 m A.9 Rp 108,588.20 Rp 1,628,823.00

E.2 PEKERJAAN TANAH


1 Pek. Galian tanah menerus 7.50 m3 B.1 Rp 80,075.00 Rp 600,562.50
2 Pek. Urugan pasir 0.75 m3 B.10 Rp 214,550.00 Rp 160,912.50
3 Pek. Pondasi batu kali 10.50 m3 C.2 Rp 978,594.00 Rp 10,275,237.00

E.3 PEKERJAAN STRUKTUR


1 Pek. Kolom praktis 48.00 m O.46 Rp 97,781.96 Rp 4,693,534.08
2 Pek. Sloof praktis 30.00 m O.47 Rp 106,886.36 Rp 3,206,590.80
3 Pek. Ring praktis 30.00 m O.48 Rp 107,832.80 Rp 3,234,984.00

E.4 PEKERJAAN ARSITEKTUR


1 Pek. Pas. Bata merah 60.00 m2 D.11 Rp 186,706.50 Rp 11,202,390.00

E.5 PEKERJAAN ATAP


1 Pek. Rangka kanopi holoow 4 x 4 cm 50.00 m2 O.88 Rp 134,000.00 Rp 6,700,000.00
2 Pek. Atap Spandek 50.00 m2 O.89 Rp 225,000.00 Rp 11,250,000.00

E.7 PEKERJAAN PENATAAN


1 Pek. Urugan pasir 18.75 m2 B.10 Rp 214,550.00 Rp 4,022,812.50
2 Pek. Pas kanstin 80.00 m O.26 Rp 227,262.17 Rp 18,180,973.60
3 Pek. Pasangan paving 150.00 m2 E.23 Rp 218,607.50 Rp 32,791,125.00
4 Pek. Pintu gerbang sliding 1.00 Unit O.87 Rp 9,000,000.00 Rp 9,000,000.00

E.8 PEKERJAAN MEP


1 Pekerjaan Instalasi Titik Lampu 8.00 Titik O.11 Rp 288,200.00 Rp 2,305,600.00
2 Pekerjaan Instalasi Stop Kontak 2.00 Titik O.26 Rp 349,700.00 Rp 699,400.00
3 Pekerjaan Lampu SL 8.00 Bh O.41 Rp 159,740.00 Rp 1,277,920.00
4 Pekerjaan Stop Kontak 2.00 Bh O.24 Rp 48,220.00 Rp 96,440.00
5 Pekerjaan Lampu Kapal 6.00 Bh O.40 Rp 159,740.00 Rp 958,440.00
6 Pekerjaan Saklar Ganda 1.00 Bh O.23 Rp 49,550.00 Rp 49,550.00

TOTAL 454,754,952.86
BACK UP DATA

NO. PERHITUNGAN VOLUME Sat

1 2 3 4 5
NO.
URAIAN PEKERJAAN PANJANG X LEBAR X TINGGI X BJ BESI X JUMLAH X LUAS - TOTAL = HASIL = REAL
- -
XIII PEKERJAAN PAGAR - -
A PEKERJAAN. PERSIAPAN - -
1 Pek. Pengukuran & pemasangan bowpank 83.000 83.000 83.00 m
- -
B PEKERJAAN TANAH - -
1 Pek. Galian pondasi menerus 26.000 x 0.600 x 0.500 7.800 7.80 m3
2 Pek. Urugan pasir 26.000 x 0.600 x 0.050 0.780 0.78 m3
3 Pek. Pas. Batu Kali 26.000 x 0.400 x 1.100 11.440 11.44 m3
4 Pek. Urugan tanah kembali 2.600 2.60 m3
- -
C PEKERJAAN STRUKTUR - -
1 Pek. Kolom praktis 2.500 x 20.750 51.875 51.88 m
2 Pek. Sloof praktis 83.000 83.000 83.00 m
3 Pek. Ring praktis 83.000 83.00 m
- -
D PEKERJAAN ARSITEKTUR - -
1 Pek. Pas. Dinding batako 166.000 x 2.500 415.000 415.00 m2
2 Pek. Plesteran 830.000 830.00 m2
3 Pek. Acian 830.000 830.00 m2
4 Pek. Pengecatan 830.000 830.00 m2
- -
- -
XIV PEKERJAAN PAGAR SITE ENTRANCE - -
A PEKERJAAN PERSIAPAN - -
1 Pek. Pengukuran & Pemasangan bowplang 138.200 138.200 138.20 m
- -
B PEKERJAAN TANAH - -
1 Pek. Galian tanah menerus 138.200 x 0.500 x 0.400 27.640 27.64 m3
2 Pek. Galian tanah setempat 1.000 x 1.000 x 0.600 x 4.000 2.400 2.40 m3
3 Pek. Urugan pasir 1.000 x 1.000 x 0.050 x 4.000 0.200 0.20 m3
4 Pek. Urugan tanah kembali 4.607 4.61 m3
- -
C PEKERJAAN STRUKTUR - -
1 Pek. Sloof 20 / 25 cm - -
Beton K 250 138.200 x 0.200 x 0.250 6.910 6.91 m3
Pek. Tulangan pokok 138.200 x 4.000 x 1.043 576.421 576.42 kg
Pek. Tulangan sengkang 1,106.600 x 0.900 x 0.617 614.495 614.49 kg
Pek. Begesting 2 kali pakai 138.200 x 0.500 69.100 69.10 m2
- -
2 Pek. Kolom 20 x 20 cm - -
Beton K 250 4.000 x 0.200 x 0.200 x 4.000 0.640 0.64 m3
Pek. Tulangan pokok 4.000 x 4.000 x 1.043 x 4.000 66.735 66.73 kg
Pek. Tulangan Sengkang 26.667 x 0.800 0.617 x 4.000 52.651 52.65 kg
Pek. Begesting 2 kali pakai 4.000 x 0.800 x 2.000 6.400 6.40 m2
- -
3 Pek. Plat pintu masuk - -
Beton K 250 6.000 x 3.000 x 0.300 5.400 5.40 m3
Pek. Tulangan pokok 30.000 x 3.000 x 1.043 93.846 93.85 kg
Pek. Tulangan bagi 20.000 x 6.000 x 1.043 125.128 125.13 kg
Pek. Begesting 2 kali pakai 18.000 18.000 18.00 m2
- -
4 Pek. Ram difabel - -
Beton K 175 3.000 x 3.000 x 0.500 4.500 4.50 m3
Pek. Tulangan pokok 15.000 x 3.000 x 1.043 2.000 93.846 93.85 kg
Pek.begesting 3.000 3.000 3.00 m2
- -
D PEKERJAAN ARSITEKTUR - -
D.1 PEKERJAAN PLANTER BOX - -
1 Pek. Galian tanah menerus 138.200 x 0.200 x 0.150 4.146 4.15 m3
2 Pek. Pas kanstin 138.200 138.200 138.20 m
2 Pek. Pas. Batako 138.200 x 3.100 428.420 428.42 m2
3 Pek. Plesteran 428.42 m2
4 Pek. Acian 428.42 m2
5 Pek. Pengecatan 428.42 m2
6 Pek. Gril besi hollow 276.400 276.40 m

6.00 Titik
6.00 Bh

- -
D.2 PEKERJAAN CANDI BENTAR - -
1 Pek. Candi bentar paras sangsit 1.000 1.00 Set
2 Pek. Pengeresek 3.000 x 0.200 1.200 1.20 m3
3 Pek. Pintu Lipat Lebar 5 m 1.000 1.00 Unit
4 Pek. Coating tempelan 3.000 x 2.000 12.000 12.00 m2
- -
D.3 PEKERJAAN PENUTUP LANTAI - -
1 Pek. Tempelan batu Andesit 5.000 x 2.700 13.500 13.50 m2
2 Pek. Pegangan ram stainlees 10.000 10.000 10.00 m

E PEKERJAAN RUMAH KOMPOS


E.1 PEK. PERSIAPAN
1 Pek Pengukuran dan pemasangan bowplank 10.000 x 5.000 15.000 15.00 m

E.2 PEKERJAAN TANAH


1 Pek. Galian tanah menerus 10.000 x 5.000 x 0.500 x 0.500 7.500 7.50 m3
2 Pek. Urugan pasir 30.000 0.050 x 0.500 0.750 0.75 m3
3 Pek. Pondasi batu kali 30.000 x 0.700 x 0.500 10.500 10.50 m3

E.3 PEKERJAAN STRUKTUR


1 Pek. Kolom praktis 4.000 x 12.000 48.000 48.00 m
2 Pek. Sloof praktis 30.000 30.000 30.00 m
3 Pek. Ring praktis 30.000 30.000 30.00 m

E.4 PEKERJAAN ARSITEKTUR


1 Pek. Pas. Bata merah 30.000 x 2.000 60.000 60.00 m2

E.5 PEKERJAAN ATAP


1 Pek. Rangka kanopi holoow 4 x 4 cm 50.000 50.000 50.00 m2
2 Pek. Atap Spandek 50.000 50.000 50.00 m2

E.7 PEKERJAAN PENATAAN


1 Pek. Urugan pasir 25.000 x 15.000 x 0.050 18.750 18.75 m2
2 Pek. Pas kanstin 80.000 80.000 80.00 m
3 Pek. Pasangan paving 15.000 x 10.000 150.000 150.00

E.8 PEKERJAAN MEP


1 Pekerjaan Instalasi Titik Lampu 8.00 Titik
2 Pekerjaan Instalasi Stop Kontak 2.00 Titik
3 Pekerjaan Lampu SL 8.00 Bh
4 Pekerjaan Stop Kontak 2.00 Bh
5 Pekerjaan Lampu Kapal 6.00 Bh
6 Pekerjaan Saklar Ganda 1.00 Bh
- -
XIV PEKERJAAN STAGE SINGA AMBARA RAJA - -
A PEKERJAAN PERSIAPAN - -
1 Pek, pengukuran & pemasangan bowplank 132.000 132.000 132.00 m
- -
B PEKERJAAN ARSITEKTUR - -
1 Pek. Tempelan lantai floor hardener 37.000 x 6.190 x 2.000 + 515.290 973.350 973.35 m2
2 Pek. Tempelan dinding batu candi 37.000 x 0.400 x 13.000 192.400 192.40 m2
3 Pek. Coating tempelan 1,165.750 1,165.75 m2
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
HARGA JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN KODE ANALISA
SATUAN (Rp) (Rp)

1 2 3 4 5

XV PEKERJAAN DRAINASE
1 Pek. Galian tanah 99.15 m3 B.1 80,075.00 7,939,596.40
2 Pek Urugan Pasir Bawah Drainase 9.92 m3 B.10 214,550.00 2,127,306.16
3 Pek.Cor beton K 250 69.41 m3 G.5 1,014,345.06 70,402,038.77
4 Pek. Tulangan Ø 8 2740.72 kg G.14 11,997.22 32,881,019.88
5 Pek. Bekisting 2 kali pakai 495.76 m2 G.16 142,687.90 70,738,953.30
6 Pek. Pas. Grill Besi 30X30X3 mm 495.76 m1 O.53 307,136.89 152,266,183.59

TOTAL 336,355,098.11
KODE HARGA JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN
VOLUME ANALISA SATUAN (Rp) (Rp)

1 2 4 5 6 7 8

XVIII PEKERJAAN PENATAAN VEGETASI


1 Pek. Penanaman Rumput Gajah Mini 44.00 m2 P.2 55,000.00 2,420,000.00
2 Pek. Penanaman Pohon Kenanga t= 3 m 2.00 bh P.3 2,800,000.00 5,600,000.00
3 Pek. Penanaman Pohon Jepun Bali t= 3 m 3.00 bh P.4 1,800,000.00 5,400,000.00
4 Pek. Penanaman Pohon Kelapa t= 3 m 1.00 bh P.5 2,500,000.00 2,500,000.00
5 Pek. Penanaman Pohon Intaran t= 3 m 1.00 bh P.6 2,200,000.00 2,200,000.00
6 Pek. Penanaman Pohon Cempaka t= 3 m 2.00 bh P.7 1,600,000.00 3,200,000.00
7 Pek. Penanaman Pohon Juwet t= 3 m 1.00 bh P.8 1,700,000.00 1,700,000.00
8 Pek. Penanaman Pohon Majegau t= 3 m 1.00 bh P.9 2,500,000.00 2,500,000.00
9 Pek. Penanaman Pohon Boni t= 3 m 1.00 bh P.10 1,900,000.00 1,900,000.00
10 Pek. Penanaman Pohon Manggis t= 3 m 1.00 bh P.11 2,200,000.00 2,200,000.00
11 Pek. Penanaman Pohon Kepundung t= 3 m 1.00 bh P.12 1,350,000.00 1,350,000.00
12 Pek. Penanaman Pohon Dadap t= 3 m 1.00 bh P.13 1,400,000.00 1,400,000.00
13 Pek. Penanaman Pohon Sentul/Kecapi t= 3 m 1.00 bh P.14 1,750,000.00 1,750,000.00

TOTAL 34,120,000.00
VOLUME KODE HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN
PENYESUAIAN ANALISA (Rp) (Rp)
PAGU
1 2 4 5 6 7 8

XIX PEKERJAAN MEKANIKAL ELEKTRIKAL PLUMBING DAN PENGADAAN BARANG


A MEP PANEL LISTRIK
1 Penambahan Daya Daya Listrik 66 kVa 1.00 Unit O.38 63,954,000.00 63,954,000.00
2 Panel Patung 1.00 Unit O.3 12,310,310.00 12,310,310.00
3 Panel Pompa Air Mancur 1.00 Unit O.2 15,627,260.00 15,627,260.00
4 Panel Stage 1.00 Unit O.4 14,385,260.00 14,385,260.00
5 Panel Lampu Taman Zona A 1.00 Unit O.5 8,006,510.00 8,006,510.00
6 Panel Lampu Taman Zona C 1.00 Unit 0.5 8,006,510.00 8,006,510.00
7 Genzet Cummins, Stamford 66kVA (Komplit) 1.00 Unit O.39 237,000,000.00 237,000,000.00
- Capacity : 66 KVA,
- Brand : CUMMINS- STAMFORD
- Type : Silent
8 Tangki mingguan Bahan Bakar Genset kap. 2000 Liter 1.00 unit O.42 23,700,000.00 23,700,000.00
9 Instalasi Pemipaan Bahan Bakar Genset 1.00 lot O.43 6,710,000.00 6,710,000.00
10 Pompa bahan bakar type Elektrik Gear pump, kap. 10lpm,head 15 meter 1.00 unit O.44 20,325,000.00 20,325,000.00
11 Panel Pompa bahan bakar 1.00 unit O.45 4,000,000.00 4,000,000.00
12 Pompa Manual bahan bakar, hand pump Koshin termasuk valve 1.00 unit O.46 6,950,000.00 6,950,000.00
13 Load Bank Test 1.00 unit O.47 13,100,000.00 13,100,000.00

B MEP KABEL FEEDER


1 LVMDP Ke Panel Patung, NYFGBY 4 x 16 mm2 74.00 m O.7 197,770.00 14,634,980.00
2 LVMDP ke Panel Pompa Air Mancur, NYFGBY 4 x 25 mm2 82.00 m O.9 286,320.00 23,478,240.00
3 LVMDP ke Panel Stage, NYFGBY 4 x 35 mm2 30.00 m O.10 356,720.00 10,701,600.00
4 LVMDP ke Panel Lampu Taman Zona A, NYFGBY 4 x 10 mm2 58.00 m O.8 133,420.00 7,738,360.00
5 LVMDP ke Panel Lampu Taman Zona C, NYFGBY 4 x 10 mm2 87.00 m O.8 133,420.00 11,607,540.00
6 Back Up Genzet ke LVMDP, NYY 2 x (4 x 1 x 120 mm2) 35.00 m O.6 1,972,620.00 69,041,700.00

C MEP KAWASAN
PEKERJAAN BIOPORI
1 Pekerjaan Galian Lubang Biopori 266.00 Titik Dihit 5,000.00 1,330,000.00
2 Pekerjaan Pipa Biopori 4" (1 Meter) 266.00 Bh P.18 57,800.00 15,374,800.00
3 Pekerjaan Dop Pipa Biopori 266.00 Bh P.19 5,500.00 1,463,000.00

INSTALASI PEMBUANGAN AIR KOTOR


1 Pek. Pipa PVC AW 4" 212.00 m P.3 152,650.00 32,361,800.00
2 Pek. Pipa PVC AW 6" 83.00 m P.1 382,520.00 31,749,160.00
4 Pek. Septic Tank dan Resapan 4.00 Unit P.22 6,341,000.00 25,364,000.00

INSTALASI SIRAMAN TAMAN


1 Pembuatan Sumur Bor meter dengan 1.00 Unit P.54 30,000,000.00 30,000,000.00
Casing PVC AW dia.6" termasuk pembersihan, perijinan ,
dan test laboratorium sehingga mendapatkan air dengan
kualitas yang baik
- kedalaman : 60 m
- Casing : PVC AW dia. 6"
- Test Laboratorium
- Perijinan
2 Submersible Deep well Pump termasuk panel kontrol dan Kabel Kontrol 1.00 Set P.55 27,400,000.00 27,400,000.00
(Pompa Sumur Bor)
- Type Submersible Deepwell Pump, Grundfos SP-3A-22
- Kap. : 3 m3/jam
- Head : 90 meter
- Discharge : dia. 1 1/4"
- Power : 1,5 kW/3x380V/50Hz/2900rpm

3 Pekerjaan Booster Pump 2 x CR 10 -5 1.00 Set O.54 26,200,000.00 26,200,000.00


(Pompa Supplay Ke Kolam dan Alat Sanitair)
- 1 Set Terdiri 2 Unit

4 Irrigation Pump 2 x CR 10 - 5, 3 - 4 Bar 1.00 Set P.23 31,541,000.00 31,541,000.00


(Pompa Siram Taman)
5 Pek. Pipa PVC 1/2" 303.00 m P.10 21,810.00 6,608,430.00
6 Pek. Pipa PVC 1 1/4" 171.70 m P.8 44,400.00 7,623,480.00
7 Pek. Pipa PVC 2" 641.00 m P.6 56,560.00 36,254,960.00
8 Garden Tap 17.00 Bh P.16 218,160.00 3,708,720.00
9 Sprinkler 25.00 Bh Dihit 45,000.00 1,125,000.00
10 Valve 10.00 Bh P.20 307,200.00 3,072,000.00

INSTALASI LAMPU TAMAN


1 Pek. Instalasi Titik Lampu Taman (NYFGBY 3 x 2,5 mm2) 80.00 Titik O.12 Rp 761,300.00 60,904,000.00
2 Pek. Lampu Taman Cabang Dua 40.00 Bh O.28 2,177,270.00 87,090,800.00
3 Pek. Lampu Taman Bulat 40.00 Bh O.29 622,270.00 24,890,800.00
4 Pek. Lampu Jogging Track 40.00 Bh O.30 292,270.00 11,690,800.00

ALAT PEMADAM KEBAKARAN


1 Pekerjaan Fire Extinguisher 3,5 kg, CO2 10.00 Unit O.37 625,000.00 6,250,000.00

TOTAL 1,043,280,020.00
RENCANA ANGGARAN BIAYA / RAB
PEKERJAAN : RIVIEW DED PEMBANGUNAN RTH TAMAN BUNG KARNO TAHAP IV
LOKASI : KAB. BULELENG
TAHUN : 2020

KODE
NO URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
ANALISA

1 2 3 4 5 6 7
XX PEKERJAAN RENOVASI
A PEKERJAAN PERSIAPAN
1 Pek. Pembersihan lahan 18.00 m O.56 Rp 21,730.00 Rp 391,140.00

B PEKERJAAN RENOVASI KIOS


1 Pek. Kolom Balok Kayu 0.45 m3 O.44 Rp 19,435,355.00 Rp 8,745,909.75
2 Pek. Usuk Exspose 109.71 m2 K.3 Rp 231,933.90 Rp 25,444,865.14
3 Pek. Atap Ex. Alderon 548.54 m2 O.45 Rp 152,739.80 Rp 83,783,431.67
4 Pek. Polituran 113.40 m2 L.3 Rp 66,186.00 Rp 7,505,492.40
5 Pek. Pengecetan dinding 361.90 m2 L.1 Rp 36,942.05 Rp 13,369,327.90
6 Pek. Pengcatan Plafond 155.10 m2 L.1 Rp 36,942.05 Rp 5,729,711.96

C PEKERJAAN RENOVASI KM/ WC


1 Pek. Waterprofing 179.20 m2 L.8 Rp 70,100.00 Rp 12,561,920.00
2 Pek. Pengecetan 122.88 m2 L.1 Rp 36,942.05 Rp 4,539,439.10
3 Pek. Plafond Gypsum rangka hollow 122.88 m2 O.107 Rp 276,036.60 Rp 33,919,377.41

D PEKERJAAN KAWASAN
1 Pek. Pengecetan monumen 165.00 m2 L.1 Rp 36,942.05 Rp 6,095,438.25
2 Pek. Pengecatan Bangunan Pengelola 112.00 m2 L.1 Rp 36,942.05 Rp 4,137,509.60
3 Pek. Petunjuk In dan Out pintu masuk 1.00 Ls O.75 Rp 5,303,650.00 Rp 5,303,650.00

TOTAL 211,527,213.18
BACK UP DATA

NO. PERHITUNGAN

1 2
NO.
URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN
1 Pek. Pengukuran
2 Pek. Pembersihan dan Pematangan site
3 Pek. Papan nama proyek
4 Biaya penyelenggaraan SMK 3 Kontruksi

II PEKERJAAN PATUNG BUNG KARNO


A PEKERJAAN PERSIAPAN
1 Pek.Pengukuran & Pemasangan bowpank

B PEKERJAAN STRUKTUR
1 Pek. Angker patung d 22
2 Pek. Pengelasan
3 Pek. Beton K 250

C PEKERJAAN PATUNG PERUNGGU


1 Pek. Lanjutan patung bung karno

D PEKERJAAN MEP
1 Pek. Instalasi Titik Lampu Spot
2 Pek Lampu Spot 400 W

III PEKERJAAN RELIEF


A PEKERJAAN. PERSIAPAN
1 Pek.Pengukuran & Pemasangan bowpank
B PEK. RELIEF PERUNGGU
1 Pek. Relief Nomor 5,7,8,11,13,14,15 dan 17
2 Pek. Relief Nomor 1,2 dan 3
3 Pek. Finishing
4 Pek. Baut angker D10
5 Pek. Border Batu Palimanan
6 Pek. Coating tempelan
7 Pek. Waterprofing clear

D PEKERJAAN MEP
1 Pek. Instalasi Titik Lampu Spot
2 Pekerjaan Lampu Sorot 150 Watt

IV PEKERJAAN PATUNG SINGA AMBARA RAJA


A PEKERJAAN. PERSIAPAN
1 Pek.Pengukuran & Pemasangan bowpank
2 Pek. Bongkaran

B PEKERJAAN. TANAH
1 Pek. Galian pondasi telapak
2 Pek. Urugan pasir
3 Pek. Bore pile ø 30
4 Pek. Pondasi batu kali
5 Pek. Urugan tanah kembali

C PEKERJAAN. STRUKTUR
1 Pek. Perkuatan tulangan d 22

2 Pek. Fotplate
Beton K250
Pek. Pembesian d 16
Pek. Begesting batako

3 Pek. Sloof 20 / 25 cm
Beton K 250
Pek. Tulangan pokok
Pek. Tulangan sengkang
Pek. Begesting 2 kali pakai

4 Pek. Kolom K1 50 x 50 cm
Beton K250
Pek. Tulangan pokok
Pek . Tulangan sengkang
Pek. Begesting 2 kali pakai

5 Pek. Kolom K2 40 x40 cm


Beton K250
Pek. Tulangan pokok
Pek . Tulangan sengkang
Pek. Begesting 2 kali pakai

6 Pek. Kolom K3 30 x 30 cm
Beton K250
Pek. Tulangan pokok
Pek . Tulangan sengkang
Pek. Begesting 2 kali pakai

7 Pek. Balok B1 40 x 70 cm
Beton K 250
Pek. Tulangan pokok
Pek. Tulangan sengkang
Pek. Begesting 2 kali pakai

8 Pek. Balok B2 25 x 40 cm
Beton K 250
Pek. Tulangan pokok
Pek. Tulangan sengkang
Pek. Begesting 2 kali pakai

9 Pek. Balok B3 25 x 40 cm
Beton K 250
Pek. Tulangan pokok
Pek. Tulangan sengkang
Pek. Begesting 2 kali pakai

10 Pek. Balok BM1 40 x 70 cm


Beton K 250
Pek. Tulangan pokok
Pek. Tulangan sengkang
Pek. Begesting 2 kali pakai
11 Pek. Balok BM2 25 x 40 cm
Beton K 250
Pek. Tulangan pokok
Pek. Tulangan sengkang
Pek. Begesting 2 kali pakai

12 Pek. Kolom praktis 15 x 15 cm


13 Pek. Sloof praktis 15 / 20 cm

D PEKERJAAN ARSITEKTUR
1 Pek. Lanjutan Patung Singa Ambara Raja
2 Pek. Ukiran tembok stage patung
3 Pek. Gayor belakang singa ambara raja
4 Pek. Aling aling belakang

E PEKERJAAN MEP
1 Pek. Instalasi Titik Lampu (NYFGBY 3 x 4 mm2)
2 Pek. Instalasi Stop Kontak
3 Pek. Lampu Spot 1000 Watt
4 Pek. Lampu Spot 3000 Watt
5 Pek. Stop Kontak Weather Proof
6 Air Terminal (R = 150 m) + Tiang Pipa GIP 2 m (Grounding System, Bak Kontrol)

XIII PEKERJAAN PAGAR


A PEKERJAAN. PERSIAPAN
1 Pek. Pengukuran & pemasangan bowpank

B PEKERJAAN TANAH
1 Pek. Galian pondasi menerus
2 Pek. Urugan pasir
3 Pek. Pas. Batu Kali
4 Pek. Urugan tanah kembali

C PEKERJAAN STRUKTUR
1 Pek. Kolom praktis
2 Pek. Sloof praktis
3 Pek. Ring praktis

D PEKERJAAN ARSITEKTUR
1 Pek. Pas. Dinding batako
2 Pek. Plesteran
3 Pek. Acian
4 Pek. Pengecatan

XIV PEKERJAAN PAGAR SITE ENTRANCE


A PEKERJAAN PERSIAPAN
1 Pek. Pengukuran & Pemasangan bowplang

B PEKERJAAN TANAH
1 Pek. Galian tanah menerus
2 Pek. Galian tanah setempat
3 Pek. Urugan pasir
4 Pek. Urugan tanah kembali

C PEKERJAAN STRUKTUR
1 Pek. Sloof 20 / 25 cm
Beton K 250
Pek. Tulangan pokok
Pek. Tulangan sengkang
Pek. Begesting 2 kali pakai

2 Pek. Kolom 20 x 20 cm
Beton K 250
Pek. Tulangan pokok
Pek. Tulangan Sengkang
Pek. Begesting 2 kali pakai

3 Pek. Plat pintu masuk


Beton K 250
Pek. Tulangan pokok
Pek. Tulangan bagi
Pek. Begesting 2 kali pakai

4 Pek. Ram difabel


Beton K 175
Pek. Tulangan pokok
Pek.begesting

D PEKERJAAN ARSITEKTUR
D.1 PEKERJAAN PLANTER BOX
1 Pek. Galian tanah menerus
2 Pek. Pas kanstin
2 Pek. Pas. Batako
3 Pek. Plesteran
4 Pek. Acian
5 Pek. Pengecatan
6 Pek. Gril besi hollow

D.2 PEKERJAAN CANDI BENTAR


1 Pek. Candi bentar paras sangsit
2 Pek. Pengeresek
3 Pek. Pintu Lipat Lebar 5 m
4 Pek. Coating tempelan

D.3 PEKERJAAN PENUTUP LANTAI


1 Pek. Tempelan batu Candi
2 Pek. Pegangan ram stainlees

E PEKERJAAN RUMAH KOMPOS


E.1 PEK. PERSIAPAN
1 Pek Pengukuran dan pemasangan bowplank

E.2 PEKERJAAN TANAH


1 Pek. Galian tanah menerus
2 Pek. Urugan pasir
3 Pek. Pondasi batu kali

E.3 PEKERJAAN STRUKTUR


1 Pek. Kolom praktis
2 Pek. Sloof praktis
3 Pek. Ring praktis

E.4 PEKERJAAN ARSITEKTUR


1 Pek. Pas. Bata merah
E.5 PEKERJAAN ATAP
1 Pek. Rangka kanopi holoow 4 x 4 cm
2 Pek. Atap Spandek

E.7 PEKERJAAN PENATAAN


1 Pek. Urugan pasir
2 Pek. Pas kanstin
3 Pek. Pasangan paving

E.8 PEKERJAAN MEP


1 Pekerjaan Instalasi Titik Lampu
2 Pekerjaan Instalasi Stop Kontak
3 Pekerjaan Lampu SL
4 Pekerjaan Stop Kontak
5 Pekerjaan Lampu Kapal
6 Pekerjaan Saklar Ganda

XIV PEKERJAAN STAGE SINGA AMBARA RAJA


A PEKERJAAN PERSIAPAN
1 Pek, pengukuran & pemasangan bowplank

B PEKERJAAN ARSITEKTUR
1 Pek. Tempelan lantai floor hardener
2 Pek. Tempelan dinding batu candi
3 Pek. Coating tempelan

XX PEKERJAAN RENOVASI
A PEKERJAAN PERSIAPAN
1 Pek. Pembersihan lahan

B PEKERJAAN RENOVASI KIOS


1 Pek. Kolom Balok Kayu
2 Pek. Usuk Exspose
3 Pek. Atap Ex. Alderon
4 Pek. Polituran
5 Pek. Pengecetan dinding
6 Pek. Pengcatan Plafond

C PEKERJAAN RENOVASI KM/ WC


1 Pek. Waterprofing
2 Pek. Pengecetan
3 Pek. Plafond Gypsum rangka hollow

D PEKERJAAN KAWASAN
1 Pek. Pengecetan monumen
2 Pek. Pengecatan Bangunan Pengelola
3 Pek. Petunjuk In dan Out pintu masuk

E PEKERJAAN MEP
1 Pekerjaan Instalasi Lampu
2 Pekerjaan Lampu Sorot 150 Watt
3 Pekerjaan Galian Lubang Biopori
4 Pekerjaan Pipa Biopori 4" (1 Meter)
5 Pekerjaan Dop Pipa Biopori
PERHITUNGAN

3
PANJANG X LEBAR X TINGGI X BJ BESI X

47.000
11.000 X 42.252

8.000 x 7.500

11.000 x 8.000 x 2.986

2.000 x 0.800 x 2.200

8.000 x 8.000
8.000 x 2.400 x 1.200
8.000 x 14.000
9.000 x 0.100 x 8.000
8.000 x 2.400 x 1.200
8.000 x 1.300 x 8.000

26.000
4.000 x 2.000 x 1.500

2.000 x 1.000 x 0.800 x


2.000 x 1.000 x 0.050 x
6.000 x
27.340 x 0.550 x 0.700

7.000 x 8.000 x x 2.986 x

2.000 x 1.000 x 0.400 x


40.000 x 2.500 1.580 x
8.000 x 0.400 x

27.340 x 0.200 x 0.250


27.340 x 4.000 x 1.580
219.720 x 0.900 x 0.617
27.340 x 0.500

17.500 x 0.500 x 0.500 x


17.500 x 16.000 x 2.986 x
116.667 x 0.617 x
17.500 x 2.000 x

6.200 x 0.400 x 0.400 x


6.200 x 12.000 x 2.986 x
41.333 x 0.617 x
6.200 x 1.600 x

4.600 x 0.300 x 0.300 x


4.600 x 12.000 x 2.986 x
30.667 x 0.617 x
4.600 x 1.200 x

49.000 x 0.400 x 0.700


49.000 x 20.000 x 2.986
393.000 x 2.200 x 0.617
49.000 x 1.800 x

14.000 x 0.250 x 0.400


14.000 x 8.000 x 2.986
113.000 x 1.300 x 0.617
14.000 x 1.050 x

4.500 x 0.250 x 0.400


4.500 x 6.000 x 2.986
37.000 x 1.300 x 0.617
4.500 x 1.050 x

15.400 x 0.400 x 0.700


15.400 x 10.000 x 2.986
124.200 x 2.200 x 0.617
15.400 x 1.800 x
15.400 x 0.250 x 0.400
15.400 x 6.000 x 2.986
124.200 x 1.300 x 0.617
15.400 x 1.050 x

25.000 x 1.000 x 3.500


25.000 x 19.000 x 0.300

System, Bak Kontrol)

83.000

26.000 x 0.600 x 0.500


26.000 x 0.600 x 0.050
26.000 x 0.400 x 1.100
2.500 x 20.750
83.000

166.000 x 2.500

138.200

138.200 x 0.500 x 0.400


1.000 x 1.000 x 0.600 x
1.000 x 1.000 x 0.050 x

138.200 x 0.200 x 0.250


138.200 x 4.000 x 1.043
1,106.600 x 0.900 x 0.617
138.200 x 0.500

4.000 x 0.200 x 0.200 x


4.000 x 4.000 x 1.043 x
26.667 x 0.800 0.617 x
4.000 x 0.800 x

6.000 x 3.000 x 0.300


30.000 x 3.000 x 1.043
20.000 x 6.000 x 1.043
18.000

3.000 x 3.000 x 0.500


15.000 x 3.000 x 1.043
3.000

138.200 x 0.200 x 0.150


138.200
138.200 x 3.100

276.400

3.000 x 0.200

3.000 x 2.000

5.000 x 2.700
10.000

10.000 x 5.000

10.000 x 5.000 x 0.500 x 0.500


30.000 0.050 x 0.500
30.000 x 0.700 x 0.500

4.000 x 12.000
30.000
30.000

30.000 x 2.000
50.000
50.000

25.000 x 15.000 x 0.050


80.000
15.000 x 10.000

132.000

37.000 x 6.190 x
37.000 x 0.400 x

12.000 x 6.000

5.000 x 0.150 x 0.150 x


51.700 x 10.610 x
51.700 x 10.610
567.000 x 0.200
51.700 x 3.500 x
51.700 x 3.000

11.200 x 8.000 x
9.600 x 6.400 x
9.600 x 6.400 x

5.500 x 15.000
32.000 x 3.500
VOLUME

4
JUMLAH X LUAS - TOTAL = HASIL =

47.000 47.000
464.772 464.772
1.000 1.000
1.000 1.000

-
-
31.000 31.000

-
262.793 262.793
32.000
3.520
-
-
1.000

-
-
-
64.000
-
-
1.000
1.000
23.040
112.000
7.200
23.040
83.200

-
-
26.000
12.000
-
-
4.000 6.400
4.000 1.220
8.000 48.000
10.526
2.133
-
-
2.000 334.463
-
-
4.000 3.200
4.000 631.808
4.000 12.800
-
-
1.367
172.736
122.011
13.670
-
-
8.000 35.000
8.000 6,689.267
8.000 575.867
4.000 140.000

-
2.000 1.984
2.000 444.358
2.000 51.005
2.000 19.840

-
2.000 0.828
2.000 329.685
2.000 37.843
2.000 11.040
-
-
13.720
2,926.554
533.458
88.200

-
1.400
334.463
90.637
14.700

-
0.450
80.630
29.678
4.725

-
4.312
459.887
168.589
27.720
-
1.540
275.932
99.621
16.170

10.000
22.000
-
-
1.000
87.500
142.500
1.000

-
-
-
83.000
-
-
7.800
0.780
11.440
2.600
-
-
51.875
83.000
83.000
-
-
415.000
830.000
830.000
830.000
-
-
-
-
138.200
-
-
27.640
4.000 2.400
4.000 0.200
4.607
-
-
-
6.910
576.421
614.495
69.100
-
-
4.000 0.640
4.000 66.735
4.000 52.651
2.000 6.400
-
-
5.400
93.846
125.128
18.000
-
-
4.500
2.000 93.846
3.000
-
-
-
4.146
138.200
428.420

-
-
1.000
1.200
1.000
12.000
-
-
13.500
10.000

15.000

7.500
0.750
10.500

48.000
30.000
30.000

60.000
50.000
50.000

18.750
80.000
150.000

-
-
-
132.000
-
-
2.000 + 515.290 973.350
13.000 192.400
1,165.750
-
-
-
-
-
18.000
-
-
4.000 0.450
109.707
548.537
113.400
2.000 361.900
155.100
-
-
2.000 179.200
2.000 122.880
2.000 122.880
-
-
82.500
112.000
1.000
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
VOLUME Sat

5
REAL

47.00 m
464.77 m2
1.00 Ls
1.00 Ls

-
-
31.00 m

-
262.79 kg
32.00 ttk
3.52 m3
-
-
1.00 set

12.00 Titik
12.00 Bh

-
-
-
64.00 m
-
-
8.00 Bh
3.00 Bh
23.04 m2
112.00 bh
7.20 m2
23.04 m2
83.20 m2

16.00 Titik
16.00 Bh

-
-
26.00 m
12.00 m3
-
-
6.40 m3
1.22 m3
48.00 m
10.53 m3
2.13 m3
-
-
334.46 kg
-
-
3.20 m3
631.81 kg
12.80 m2
-
-
1.37 m3
172.74 kg
122.01 kg
13.67 m2
-
-
35.00 m3
6,689.27 kg
575.87 kg
140.00 m2

-
1.98 m3
444.36 kg
51.01 kg
19.84 m2

-
0.83 m3
329.69 kg
37.84 kg
11.04 m2
-
-
13.72 m3
2,926.55 kg
533.46 kg
88.20 m2

-
1.40 m3
334.46 kg
90.64 kg
14.70 m2

-
0.45 m3
80.63 kg
29.68 kg
4.73 m2

-
4.31 m3
459.89 kg
168.59 kg
27.72 m2
-
1.54 m3
275.93 kg
99.62 kg
16.17 m2

10.00 m
22.00 m
-
-
1.00 Ls
87.50 m2
142.50 m2
1.00 unit

8.00 Titik
15.00 Titik
6.00 Bh
2.00 Bh
15.00 Bh
1.00 Set

-
-
-
83.00 m
-
-
7.80 m3
0.78 m3
11.44 m3
2.60 m3
-
-
51.88 m
83.00 m
83.00 m
-
-
415.00 m2
830.00 m2
830.00 m2
830.00 m2
-
-
-
-
138.20 m
-
-
27.64 m3
2.40 m3
0.20 m3
4.61 m3
-
-
-
6.91 m3
576.42 kg
614.49 kg
69.10 m2
-
-
0.64 m3
66.73 kg
52.65 kg
6.40 m2
-
-
5.40 m3
93.85 kg
125.13 kg
18.00 m2
-
-
4.50 m3
93.85 kg
3.00 m2
-
-
-
4.15 m3
138.20 m
428.42 m2
428.42 m2
428.42 m2
428.42 m2
276.40 m

6.00 Titik
6.00 Bh

-
-
1.00 Set
1.20 m3
1.00 Unit
12.00 m2
-
-
13.50 m2
10.00 m

15.00 m

7.50 m3
0.75 m3
10.50 m3

48.00 m
30.00 m
30.00 m

60.00 m2
50.00 m2
50.00 m2

18.75 m2
80.00 m
150.00

8.00 Titik
2.00 Titik
8.00 Bh
2.00 Bh
6.00 Bh
1.00 Bh

-
-
-
132.00 m
-
-
973.35 m2
192.40 m2
1,165.75 m2
-
-
-
-
-
18.00 m
-
-
0.45 m3
109.71 m2
548.54 m2
113.40 m2
361.90 m2
155.10 m2
-
-
179.20 m2
122.88 m2
122.88 m2
-
-
165.00 m2
112.00 m2
1.00 Ls
-
-
-
6.00 Titik
6.00 Bh
10.00 Titik
10.00 Bh
10.00 Bh
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KODE HARGA JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN
ANALISA SATUAN (Rp) (Rp)

1 2 3 4 5 6 7
XXI PEKERJAAN MUSHOLA
A. PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bowplank 31.00 m1 A.8 82,726.40 2,564,518.40

B. PEKERJAAN TANAH
1 Galian Tanah Pondasi menerus 16.20 m3 B.1 80,075.00 1,297,166.96
2 Urugan Tanah peninggi lantai 16.25 m3 B.9 130,310.00 2,117,537.50
3 Urugan Kembali Ex. Galian 5.40 m3 B.9 130,310.00 703,647.94
4 Pasir Urug Bawah lantais t.5 cm 1.63 m3 B.10 214,550.00 348,643.75
5 Pasir Urug Bawah Pondasi menerus t.5 cm 1.16 m3 B.10 214,550.00 248,255.81
6 Pek. Pas. Pondasi menerus 9.13 m3 C.2 978,594.00 8,937,327.75
7 Pek. Pas. Batu kosong pondasi menerus 4.63 m3 C.1 511,311.30 2,366,553.22

C. PEKERJAAN STRUKTUR
1 SLOOF S1 (15 X 25 CM)
- Besi D10 - 4 81.59 kg G.14 11,997.22 978,878.13
- Besi Ø8 73.38 kg G.14 11,997.22 880,391.03
- Begisting 2 kali pakai 16.53 m2 G.16 285,375.80 4,717,261.97
- Cor Beton K-250 1.24 m3 G.8 1,092,377.82 1,354,275.40
2 RABATAN LANTAI t 5 Cm
- Besi M = 6 (1 Layer) 99.78 kg G.14 11,997.22 1,197,022.63
- Cor Beton K-250 1.63 m3 G.8 1,092,377.82 1,775,113.96
3 KOLOM K1 (20 X 20 CM)
- Besi D10 - 8 114.02 kg G.14 11,997.22 1,367,942.22
- Besi Ø8 113.01 kg G.14 11,997.22 1,355,861.69
- Begisting 2 kali pakai 13.86 m2 G.16 285,375.80 3,955,308.59
- Cor Beton K-250 0.55 m3 G.8 1,092,377.82 605,614.26
3 KOLOM KP (15 X 15 CM)
- Besi D10 - 4 47.51 kg G.14 11,997.22 569,975.92
- Begisting 2 kali pakai 11.55 m2 G.16 285,375.80 3,296,090.49
- Cor Beton K-250 0.46 m3 G.8 1,092,377.82 504,678.55
4 BALOK RB 1 (15 X 30 CM)
- Besi D10 - 6 146.23 kg G.14 11,997.22 1,754,341.48
- Begisting 2 kali pakai 29.63 m2 G.16 285,375.80 8,454,258.08
- Cor Beton K-250 1.78 m3 G.8 1,092,377.82 1,941,701.57
5 PLAT ATAP t 10 Cm
- Besi M = 6 (1 Layer) 155.22 kg G.14 11,997.22 1,862,198.89
- Bekisitng 50.56 m2 G.16 285,375.80 14,428,600.45
- Cor Beton K-250 5.06 m3 G.8 1,092,377.82 5,523,062.25
6 TEMPAT WUDHU
- Bekisting 3.77 m2 G.16 285,375.80 1,075,866.77
- Cor Beton K-250 0.43 m3 G.8 1,092,377.82 472,650.03

D. PEKERJAAN ARSITEKTUR
1 PEKERJAAN PASANGAN
-Pek. Pasangan dinding bata merah 68.00 m2 D.7 196,314.45 13,349,578.91
2 PEKERJAAN BESI DAN ALUMUNIUM
-Pek. Rangka Plafond Hollow 4/4cm 46.58 m2 I.10 115,645.00 5,387,310.76
3 PEKERJAAN PLAFOND
-Pek. Pasangan Plafond Gypsumboard 9 mm 46.58 m2 I.2 50,738.30 2,363,638.63
-Pek. Pasang List Plafond Gypsum 7/7cm 84.30 m1 I.3 34,092.90 2,874,031.47
4 PEKERJAAN VENTILASI
-Pek. Pasangan Ventilasi Roster Keramik 30x30 cm 42.00 bh O.101 100,000.00 4,200,000.00
5 PEKERJAAN PLESTERAN DAN ACIAN
-Pek. Pasangan plesteran 136.00 m2 E.4 68,182.14 9,272,907.40
-Pek. Pasangan acian 136.00 m2 E.15 41,545.25 5,650,237.09
6 PEKERJAAN PENGECETAN Ex. DULUX
-Pek. Pengecetan tembok 136.00 m2 L.1 36,942.05 5,024,192.68
-Pek. Pengecatan plafond 46.58 m2 L.1 36,942.05 1,720,941.71
-Pek. Waterproofing plat atap 59.57 m2 L.8 70,100.00 4,175,786.90
7 PEKERJAAN PENUTUP LANTAI
Pek. Pasangan lantai keramik 60 x 60 cm 28.65 m2 F.5 430,628.00 12,336,415.63
Pek. Partisi portable 14.00 m O.65 948,581.00 13,280,134.00
KODE HARGA JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN
ANALISA SATUAN (Rp) (Rp)

1 2 3 4 5 6 7
XXI PEKERJAAN MUSHOLA
E PEKERJAAN MEP
1 Pek. Instalasi Titik Lampu 4.00 Titik O.11 288,200.00 1,152,800.00
2 Pek. Instalasi Stop Kontak 2.00 Titik O.26 349,700.00 699,400.00
3 Pek. Saklar Ganda 1.00 Bh O.23 49,550.00 49,550.00
4 Pek. Stop Kontak 2.00 Bh O.24 48,220.00 96,440.00
5 Pek. Lampu Downlight 4.00 Bh O.4 91,927.50 367,710.00
6 Pek. Kran Air 5.00 Bh P.16 218,160.00 1,090,800.00
7 Pek. Pipa PVC 1/2" 20.00 m P.10 21,810.00 436,200.00
8 Pek. Floor Drain 1.00 Bh P.17 425,440.00 425,440.00

TOTAL 160,608,260.88
KODE HARGA JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN
ANALISA SATUAN (Rp) (Rp)

1 2 3 4 5 6 7
XXII PEKERJAAN RUMAH GENZET
A PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan Bouwplank 18.00 m A.8 82,726.40 1,489,075.20

B PEKERJAAN TANAH DAN PONDASI


1 Pek. Galian Tanah Pondasi 14.40 m3 B.1 80,075.00 1,153,080.00
2 Pek. Urugan Pasir Di Bawah Lantai 2.00 m3 B.10 214,550.00 429,100.00
3 Pek. Urugan Pasir Di Bawah Pondasi 0.80 m3 B.10 214,550.00 171,640.00
4 Pek. Pasangan Batu Kosong 3.20 m3 C.1 511,311.30 1,636,196.16
5 Pek. Pasangan Batu Kali 6.00 m3 C.2 978,594.00 5,871,564.00

C PEKERJAAN BETON
1 Pekerjaan Plat Lantai Beton
- Pek. Beton K-250 8.00 m3 G.8 1,092,377.82 8,739,022.55
- Pek. Pembesian D16 1820.03 kg G.14 11,997.22 21,835,279.27

2 Pekerjaan Sloof 20 x 30
- Pek. Beton K-250, 2.40 m3 G.8 1,092,377.82 2,621,706.77
- Pek. Pembesian D13 350.36 kg G.14 11,997.22 4,203,313.37
- Pek. Pembesian Ø10 238.41 kg G.14 11,997.22 2,860,242.82
- Pek. Bekisting 2 x Pakai 24.00 m2 G.16 142,687.90 3,424,509.60

3 Pekerjaan Kolom 20 x 20
- Pek. Beton K-250, 0.64 m3 G.8 1,092,377.82 699,121.80
- Pek. Pembesian D13 76.74 kg G.14 11,997.22 920,725.79
- Pek. Pembesian Ø10 55.72 kg G.14 11,997.22 668,426.31
- Pek. Bekisting 2 x Pakai 12.80 m2 G.17 343,834.95 4,401,087.36

4 Pekerjaan Balok 20 x 30
- Pek. Beton K-250, 2.40 m3 G.8 1,092,377.82 2,621,706.77
- Pek. Pembesian D13 350.36 kg G.14 11,997.22 4,203,313.37
- Pek. Pembesian Ø10 238.41 kg G.14 11,997.22 2,860,242.82
- Pek. Bekisting 2 x Pakai 24.00 m2 G.18 355,358.55 8,528,605.20

5 Pekerjaan Plat Penutup Tebal 12


- Pek. Beton K-250 4.80 m3 G.8 1,092,377.82 5,243,413.53
- Pek. Pembesian D13 1201.50 kg G.14 11,997.22 14,414,696.08
- Pek. Bekisting 2 x Pakai 40.00 m2 G.19 574,234.95 22,969,398.00

D PEKERJAAN FINISHING -
1 Pekerjaan Dinidng Bata Merah 80.00 m2 D.7 196,314.45 15,705,156.00
2 Pekerjaan Plesteran Dinding dan Lantai 160.00 m2 E.4 68,182.14 10,909,142.40
3 Pekerjaan Acian Dinding 160.00 m2 E.15 41,545.25 6,647,240.00
4 Pekerjaan Waterproofing Plat Atap 160.00 m2 L.8 70,100.00 11,216,000.00
5 Pek. Pengecatan Dinding 20.00 m2' L.1 36,942.05 738,841.00
6 Pekerjaan Pintu Ruang Genzet Komplit 1.00 Unit N.8 6,029,370.00 6,029,370.00

TOTAL 173,211,216.16
REKAPITULASI DAFTAR ANALISA HARGA SATUAN PEKERJAAN
TAHUN 2020

NO URAIAN PEKERJAAN HARGA


1 2 3

A. HARGA PEKERJAAN BONGKARAN DAN PERSIAPAN


A.1 1 m3 Pembongkaran Beton Bertulang Rp 1,458,629.00
A.2 10 m2 Membokar Usuk Reng Rp 34,030.00
A.3 10 m2 Mengupas Plesteran Rp 42,455.00
A.2 1m2 Pembongkaran Tembok Bata Rp 729,314.50
A.5 10 m2 Membongkar Lantai Rp 16,982.00
A.6 10 m2 Menurunkan Atap Genteng Rp 133,750.00
A.7 10 m2 Menurunkan Atap Seng Rp 132,450.00
A.8 Pengukuran dan Pasang 1 m' Bouwplank Rp 82,726.40
A.9 25 m' Pengukuran dan Pasang Papan Bouwpalank Jalan / Rabat Beton/ Trotoar Rp 108,588.20
A.4 1 m' Pasangan Bekisting Beton Rabat Rp 19,836.90

B HARGA SATUAN PEKERJAAN TANAH


B.1 Penggalian 1 m3 Tanah Biasa Sedalam 1 m Rp 80,075.00
B.2 Penggalian 1 m3 Tanah Biasa Sedalam 2 m Rp 98,460.00
B.3 Penggalian 1 m3 Tanah Lumpur /Sediman Sedalam 1 m Tertutup Rp 128,910.00
B.4 Penggalian 1 m3 Tanah Lumpur /Sediman Sedalam 1 m Terbuka Rp 80,075.00
B.5 Penggalian 1 m3 Tanah Lumpur Sedalam 1 m Rp 128,910.00
B.6 Penggalian 1 m3 Tanah Keras Dalam 1 m Rp 106,556.00
B.7 Mengerjakan 1 m2 Stripping Tebing Setinggi 1m Rp 5,865.00
B.8 Pengurugan Kembali 1 m3 Galian Tanah Rp 58,650.00
B.9 Pengurugan 1 m3 Dengan Tanah urug + Di Padatkan Rp 130,310.00
B.10 Pengurugan 1 m3 Dengan Pasir Urug Rp 214,550.00
B.11 1 m3 Membuang Tanah Sisa Galian /Lumpur Sampah Keluar Lokasi Sejauh 30 m' Rp 35,075.00
B.12 1 m3 Membuang Tanah Sisa Galian /Lumpur Sampah Keluar Lokasi lebih dari 30 m'/D 100 m' Rp 85,075.00

C HARGA SATUAN PEKERJAAN PONDASI


C.1 Pemasangan 1 m3 Pasangan Batu Kosong Rp 511,311.30
C.2 Pemasangan 1 m3 Pondasi Batu Kali Campuran 1SP :3PP Rp 978,594.00
C.3 Pemasangan 1 m3 Pondasi Batu Kali Campuran 1SP : 5PP Rp 892,850.10

D Harga satuan pasangan dinding


D.1 Pemasangan 1 m2 Batako 1 : 5 cetak lobang Rp 97,689.80
D.2 Pemasangan 1 m² Dinding Bata Merah (5x11x22) cm Tebal 1 Batu Campuran 1 SP : 3 PP Rp 401,167.65
D.3 Pemasangan 1 m² Dinding Bata Merah (5x11x22) cm tebal 1 Batu Campuran 1 SP : 4 PP Rp 392,079.45
D.4 Pemasangan 1 m² Dinding Bata Merah (5x11x22) cm Tebal 1 Batu Campuran 1 SP : 5 PP Rp 387,490.80
D.5 Pemasangan 1 m² Dinding Bata Merah (5x11x22) cm Tebal 1 Batu Campuran 1 SP : 6 PP Rp 386,154.30
D.6 Pemasangan 1 m² Dinding Bata Merah (5x11x22) cm Tebal ½ Batu Campuran 1 SP : 2 PP Rp 202,699.95
D.7 Pemasangan 1 m² Dinding Bata Merah (5x11x22) cm Tebal ½ Batu Campuran 1 SP : 3 PP Rp 196,314.45
D.8 Pemasangan 1 m² Dinding Bata Merah (5x11x22) cm Tebal ½ Batu Campuran 1 SP : 4 PP Rp 192,676.20
D.9 Pemasangan 1 m² Dinding Bata Merah (5x11x22) cm Tebal ½ Batu Campuran 1 SP : 5 PP Rp 190,389.30
D.10 Pemasangan 1 m² Dinding Bata Merah (5x11x22) cm Tebal ½ Batu Campuran 1 SP : 6 PP Rp 189,201.30
D.11 Pemasangan 1 m² Dinding Bata Merah (5x11x22) cm Tebal ½ Batu Campuran 1 SP : 8 PP Rp 186,706.50

E HARGA SATUAN PEKERJAAN PLESTERAN, ACIAN DAN PASANGAN


E.1 Pemasangan 1 m² Plesteran 1 SP : 2 PP tebal 15 mm Rp 74,419.14
E.2 Pemasangan 1 m² Plesteran 1 SP : 3 PP tebal 15 mm Rp 71,407.56
NO URAIAN PEKERJAAN HARGA
1 2 3
E.3 Pemasangan 1 m² Plesteran 1 SP : 4 PP tebal 15 mm Rp 69,334.50
E.4 Pemasangan 1 m² Plesteran 1 SP : 5 PP tebal 15 mm Rp 68,182.14
E.5 Pemasangan 1 m² Plesteran 1 SP : 6 PP tebal 15 mm Rp 67,249.56
E.6 Pemasangan 1 m² Plesteran 1 SP : 7 PP tebal 15 mm Rp 66,744.66
E.7 Pemasangan 1 m² Plesteran 1 SP : 8 PP tebal 15 mm Rp 66,239.76
E.8 Pemasangan 1 m² Plesteran 1 SP : 3 PP tebal 20 mm Rp 79,963.38
E.9 Pemasangan 1 m² Plesteran 1 SP : 4 PP tebal 20 mm Rp 92,762.00
E.10 Pemasangan 1 m² Plesteran 1 SP : 5 PP tebal 20 mm Rp 91,294.82
E.11 Pemasangan 1 m² Plesteran 1 SP : 6 PP tebal 20 mm Rp 89,982.08
E.12 Pemasangan 1 m² Plesteran ciprat 1SP : 2PP Rp 55,321.60
E.13 Pemasangan 1 m² Finishing siar Pasangan Bata Merah Rp 32,173.93
E.14 Pemasangan 1 m² finishing siar pasangan batu kali 1 SP : 2PP Rp 66,988.20
E.15 Pemasangan 1 m² acian Rp 41,545.25
E.16 Pemasangan 1 m² Bata Tulikup tanpa nat Rp 625,833.59
E.17 Pemasangan 1 m² Plesteran pasir melele Rp 242,574.50
E.18 Pemasangan 1 m² Ornamen Pasir melele motif bali Rp 536,306.25
E.19 Pemasangan 1 m² Pasangan Batu Jogja Tebal 2 cm Rp 257,085.50
E.20 Pemasangan 1 m² Palimanan tepi Kolam & Tempat duduk Tebal 5 cm Rp 368,795.90
E.21 Pemasangan 1 m² Palimanan Lantai Kolam Tebal 2 cm Rp 378,983.00
E.22 Pemasangan 1m2 dinding roster 20 x 20 cm campuran 1 SP : 3 PP Rp 498,770.50
E.23 Pemasangan 1 m2 Paving Stone 20x20x6 cm Rp 218,607.50

F HARGA SATUAN PEKERJAAN PASANGAN TUTUP DINDING DAN PENUTUP LANTAI


F.1 Pemasangan 1 m² lantai Tegel warna ukuran 20 cm x 20 cm Rp 196,823.10
F.2 Pemasangan 1 m² lantai keramik ukuran 20 cm x 20 cm Rp 262,508.00
F.3 Pemasangan 1 m² lantai keramik ukuran 30 cm x30 cm KW 1 Rp 252,382.00
F.4 Pemasangan 1 m² lantai keramik ukuran 40 cm x 40 cm kw 1 Rp 268,021.00
F.5 Pemasangan 1 m² lantai ukuran 60 cm x 60 cm (Setara Granito) Rp 430,628.00
F.6 Pemasangan 1 m plint ubin uk. 10x30 cm Rp 34,463.70
F.7 Pemasangan 1 m plint ubin uk. 10x40 cm Rp 35,441.70
F.8 Pemasangan 1 m² Dinding keramik ukuran 20 cm x 25 cm Rp 294,868.20

G HARGA SATUAN PEKERJAAN BETON, BEKISTING DAN PEMBESIAN


G.1 Membuat 1 m3 beton mutu F'c=7,4 (K100), slump (12+_ 2) cm,w/c =0,87 Rp 907,336.41
G.2 Membuat 1 m3 beton mutu F'c=9,8(K125), slump (12+_ 2) cm,w/c =0,78 Rp 946,852.96
G.3 Membuat 1 m3 beton mutu F'c=12,2(K150), slump (12+_ 2) cm,w/c =0,72 Rp 977,695.41
G.4 Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K100), Slump (3-6)cm, w/c = 0,87 Rp 830,469.69
G.5 Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K175), Slump (12 ± 2)cm, w/c = 0,66 Rp 1,014,345.06
G.6 Membuat 1 m3 beton mutu f'c = 16,9 Mpa (K200), Slump (12 ± 2)cm, w/c = 0,61 Rp 1,049,068.51
G.7 Membuat 1 m3 beton mutu f'c=19,3 Mpa(K 225),slump ( 12 ±2) cm, w/c = 0,58 Rp 1,075,486.77
G.8 Membuat 1 m3 beton mutu f'c=21,7 Mpa(K 250),slump ( 12 ±2) cm, w/c = 0,56 Rp 1,092,377.82
G.9 Membuat 1 m3 beton mutu f'c=24,0 Mpa(K 275),slump ( 12 ±2) cm, w/c = 0,53 Rp 1,121,382.77
G.10 Membuat 1 m3 beton mutu f'c=26,4 Mpa(K 300),slump ( 12+_2) cm, w/c = 0,52 Rp 1,130,379.46
G.11 Membuat 1 m3 beton mutu f'c=28,8 Mpa(K 325),slump ( 12+_2) cm, w/c = 0,49 Rp 1,224,706.40
G.12 - Rp 1,236,481.76
G.13 Membuat 1 m3 pek cyklop 1:3:5 Rp 949,542.50
G.14 Pembesian 10 kg dengan besi polos atau besi ulir Rp 119,972.20
G.15 Pemasangan 1 m2 bekisting trotoar Rp 162,427.00
G.16 Pemasangan 1 m2 bekisting sloof Rp 285,375.80
G.17 Pemasangan 1 m2 bekisting kolom Rp 687,669.90
G.18 Pemasangan 1 m2 bekisting balok Rp 710,717.10
NO URAIAN PEKERJAAN HARGA
1 2 3
G.19 Pemasangan 1 m2 bekisting untuk lantai Rp 1,148,469.90
G.20 Pemasangan 1 m2 bekisting untuk tangga Rp 646,944.90

H SATUAN PEKERJAAN BESI DAN ALUMUNIUM


H.1 Pemasangan 1 kg besi profil Rp 35,929.80
H.2 Pemasangan 1 kg rangka kuda-kuda IWF Rp 35,929.80
H.3 Pengerjaan 100 kg pekerjaan perakitan Rp 35,719.80

I SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


I.1 Pemasangan 1 m² langit-langit gypsum board ukuran (120 x 240 x 9) dengan rangka kayu kruing Rp 244,570.60
I.2 Pemasangan 1 m² langit-langit gypsum board ukuran (120 x 240 x 9) mm,(tanpa Rangka) Rp 50,738.30
I.3 Pemasangan 1 m' list gypsum Rp 34,092.90
I.4 Pemasangan 1 m² langit-langit lambrisering kayu , tebal 9 mm Rp 349,093.00
I.5 Pemasangan 1 m² langit-langit asbes semen,tebal 4 mm Rp 35,462.10
I.6 Pemasangan 1 m² langit-langit tripleks ukuran (120 x 240) cm tebal 6 mm (tanpa rangka) Rp 62,192.00
I.7 1 m' pasangan list langit-langit kayu profil Rp 76,908.50
I.8 1m2 pekerjaan dinding partisi Playwood rangkap rangka kayu Kruwing Rp 449,014.60
I.9 1m2 pekerjaan dinding partisi teakwood rangkap rangka kayu kruwing Rp 508,823.10
I.10 Pemasangan 1 m² rangka besi hollow 1x40.40.2 mm, modul 60x120 cm Untuk Plafond Rp 115,645.00

J PEKERJAAN KAYU
J.1 Pembuatan dan pemasangan 1 M3 Kusen Kamper pintu dan jendela kayu kamper Rp 15,523,865.00
J.2 Pembuatan dan pemasangan 1 M3 Kusen Kruing pintu dan jendela kayu kruwing Rp 13,765,485.00
J.3 Pembuatan dan pemasangan 1 M3 Kusen dan jendela jati Rp 19,435,355.00
J.4 1 m2 Daun Jendela Kaca 3 mm,Kayu kruwing Rp 788,717.60
J.5 Pembuatan dan pemasangan 1 m² pintu dan jendela kaca, kayu kamper Rp 745,384.00
J.6 Pembuatan dan pemasangan 1 m² pintu panil, kayu kamper Rp 1,049,810.00
J.7 Pemasangan 1 m² kaca tebal 3 mm Rp 176,518.40
J.8 Pemasangan 1 m² kaca tebal 5 mm Rp 174,318.40
J.9 Pembuatan 1 M2 daun pintu plywood rangkap,rangka kayu kamper tertutup ( lembar sampai 90 cm) Rp 889,804.50
J.10 1 M2 Pek.Daun pintu lapis aluminium Rp 1,000,981.50

K PEKERJAAN ATAP
K.1 Pemasangan 1 m3 kontruksi kuda-kuda konvensional, Kayu kruwing Rp 12,058,100.00
K.2 Pemasangan 1 m2 usuk kayu kruwing dan reng kayu kamper Rp 135,599.60
K.3 Pek. 1 M2 USUK EXPOSE + RENG KAMPER Rp 231,933.90
K.4 Pek. 1 M2 USUK (KRUING) Rp 107,869.20
K.5 Pek. 1 M2 RENG (KAMPER) Rp 95,510.30
K.6 1 M1 PEK. KAP BAJA RINGAN PROFIL C BENTANG < 9 M' Rp 202,167.00
K.7 1 M1 PEK. KAP BAJA RINGAN PROFIL U BENTANG < 9 M' Rp 253,803.00
K.8 - Rp 166,945.40
K.9 Pemasangan 1 m2 atap Goodyear Rp 143,267.40
K.10 Pemasangan 1 m' bubung goodyear Rp 239,154.80
K.11 Pemasangan 1 m2 Genteng Kodok Rp 118,267.40
K.12 Pemasangan 1 m' bubung genteng kodok Rp 149,154.80
K.13 Pek. 10 M' SENG TALANG Rp 1,918,890.00
K.14 1 M2 PASANG SENG GELOMBANG Rp 56,977.80
K.15 Pek. 10 M' BUBUNGAN ATAP SENG Rp 502,098.50
K.16 Pek. 1 m2 PASANGAN ATAP SENG LAMA Rp 36,495.00

L PEKERJAAN PENGECATAN
NO URAIAN PEKERJAAN HARGA
1 2 3
L.1 Pengecatan 1 M² tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup setara vinilex) Rp 36,942.05
L.2 Pengecatan 1 M² tembok lama (1 x cat dasar, 2 x cat penutup) Rp 27,114.70
L.3 Pelaburan 1 m2 bidang kayu dengan politur Rp 66,186.00
L.4 1 m2 pekerjaan cat meni Rp 21,958.50
L.5 1 M2 Pek.Bidang kayu baru (1 plamir, 1 lapis cat dasar, 2 lapis cat penutup) Rp 49,657.00
L.6 Pekerjaan 1 M² cat kayu ulang Rp 42,860.30
L.7 1 m2 Pengecatan Kanstin Rp 41,219.40
L.8 Pekerjaan 1 m² waterproofing Rp 70,100.00

M PEKERJAAN PENGASPALAN
M.1 Biaya Menggilas Perbulan Rp 20,352,000.00
M.2 1 M2 menyiapkan Sub Grade Rp 4,121.81
M.3 1 M3 Timbunan Sirtu Rp 266,772.00
M.4 1 m2 Pasangan Gladak ( Batu Pecah 10/15) Rp 87,065.80
M.5 1 M' Pas Batu Kancing 15/20 Rp 11,921.30
M.6 100 M2 Dihampar Batu Pecah 5/7 cm diatas LPB Gladak Batu Pecah Rp 2,900,751.60
M.7 100 M2 Dihampar Lapen Batu Pecah 2/3 cm + 3/4 cm + Aspal Rp 4,007,418.30
M.8 100 M2 Mengaspal Dengan Aspal 200 Kg Rp 3,818,959.40
M.9 100 M2 Mengaspal Dengan Aspal 125 Kg Rp 2,786,446.10
M.10 100 M2 Dihampar Lapen Batu Pecah 2/3 + 3/4 + Aspal Rp 3,624,346.10
M.11 100 M2 Mengaspal Dengan Aspal 175 Kg Rp 3,514,502.00
M.12 100 M2 Mengaspal Dengan Aspal 100 Kg Rp 2,358,337.70
M.13 100 M2 Mengaspal Dengan Aspal 100 kg Rp 2,345,497.70
M.14 100 M2 Mengaspal Dengan Aspal 120,8 Kg Rp 2,569,933.00

M HARGA SATUAN PEKERJAAN SANITASI


M.1 Memasang 1 Buah Kloset Duduk Rp 2,342,257.00
M.2 Memasang 1 Buah Kloset Jongkok Porselin Rp 631,254.00
M.3 Memasang 1 Buah Urinoir Rp 2,932,869.00
M.4 Memasang 1 Buah Wastafel Rp 1,410,526.00
M.5 Memasang 1 Bh Floor Drain Rp 102,144.00
M.6 1 M' PAS. PIPA PVC TIPE AW 0.5" Rp 24,730.90
M.7 1 M' PAS. PIPA PVC TIPE AW 3/4" Rp 25,273.40
M.8 1 M' PAS. PIPA PVC TIPE AW 1" Rp 36,239.65
M.9 1 M' PAS. PIPA PVC TIPE AW 4" Rp 150,251.15
M.10 Pipa PVC D Ø 0,75" Rp 27,861.10
M.11 Pipa PVC D Ø 1" Rp 30,302.35
M.12 Pipa PVC D Ø 1,5" Rp 50,576.60
M.13 Pipa PVC D Ø 2" Rp 59,295.35
M.14 Pipa PVC D Ø 2,5" Rp 68,362.85
M.15 Pipa PVC D Ø 3" Rp 81,615.35
M.16 Pipa PVC D Ø 4" Rp 103,586.60

N. PEKERJAAN LAIN-LAIN
N.1 3 M3 Bronjong Kawat 4 MM Untuk Diisi Batu Kali Rp 2,728,546.00
N.2 Membuat 1 m3 beton cor 1:3:5 Rp 870,212.00
N.3 Membuat 1 m3 beton cor 1:2:3 Rp 1,232,413.50
N.4 Membuat 1 m3 Pengeresek Rp 971,979.40
N.5 Pemasangan 1 m2 Pasangan Steger Rp 81,038.40
N.6 Pemasangan 1 m kusen pintu aluminium Rp 177,473.64
N.7 Pemasangan 1 m2 pintu kaca rangka aluminium Rp 739,799.70
NO URAIAN PEKERJAAN HARGA
1 2 3
N.8 Pemasangan 1 Unit Pintu Baja Ruang Genzet (Komplit Aksesoris) Rp 6,029,370.00
NO JENIS PEKERJAAN HARGA

O ANALISA PEKERJAAN ELEKTRIKAL


1 Pemasangan LVMDP + ATS/AMF Rp 35,925,100.00
2 Pemasangan Panel Toko Rp 15,627,260.00
3 Pemasangan Panel Patung Rp 12,310,310.00
4 Pemasangan Panel Panggung / Stage Rp 14,385,260.00
5 Pemasangan Panel Lampu Taman Rp 8,006,510.00
6 Penarikan 1 m Kabel Feeder NYY 2 x ( 4 x 1 x 120 mm2 ) Rp 1,972,620.00
7 Penarikan 1 m Kabel Feeder NYFGBY 4 x 16 mm2 Rp 197,770.00
8 Penarikan 1 m Kabel Feeder NYFGBY 4 x 10 mm2 Rp 133,420.00
9 Penarikan 1 m Kabel Feeder NYFGBY 4 x 25 mm2 Rp 286,320.00
10 Penarikan 1 m Kabel Feeder NYFGBY 4 x 35 mm2 Rp 356,720.00
11 Instalasi Penerangan / Lampu / ttk Rp 288,200.00
12 Instalasi Penerangan / Lampu taman / ttk (NYFGBY 3 x 2,5 mm) Rp 761,300.00
13 Instalasi Penerangan / Lampu taman / ttk (NYFGBY 3 x 4 mm) Rp 1,011,300.00
14 Pemasangan Lampu Spot 150 Watt Rp 404,740.00
15 Pemasangan Lampu Spot 400 Watt Rp 904,740.00
16 Pemasangan Lampu Spot 1000 Watt Rp 1,664,740.00
17 Pemasangan Lampu Spot 3000 Watt Rp 31,164,740.00
18 Pemasangan Lampu TL RMI 2 x 18 Watt Rp 527,270.00
19 Pekerjaan 1 Unit Downlight 13 W Rp 222,270.00
20 Pekerjaan Lampu Taman 2 Cabang Rp 3,014,740.00
22 Pemasangan 1 Unit Saklar tunggal Rp 46,220.00
23 Pemasangan 1 Unit Saklar Ganda 2 Gang Rp 49,550.00
24 Pemasangan 1 Unit Stop Kontak 1 Phase Rp 48,220.00
25 Pemasangan 1 Unit Stop Kontak Weather Proof Rp 70,220.00
26 Pemasangan 1 Titik Instalasi Stop Kontak Rp 349,700.00
27 Pemasangan Lampu Industri HPZ 150 W Rp 420,270.00
28 Pemasangan Lampu Taman Cabang 2 Rp 2,177,270.00
29 Pemasangan Lampu Taman Bulat Rp 622,270.00
30 Pemasangan Lampu Jogging Track Rp 292,270.00
31 Pemasangan 1 Unit Network Video Recorder (NVR) 32 Channel HDD 2 TB, include Rp 8,949,950.00
32 Pemasangan 1 Unit LCD Display 32" Rp 4,699,950.00
33 Pemasangan 1 Unit UPS 1500 Va Rp 3,699,950.00
34 Pemasangan 1 Titik Instalasi CCTV Rp 649,280.00
35 Pemasangan 1 Bh CCTV Type 4MP HBW4PER1 IP Rp 5,463,950.00
36 Pemasangan 1 Unit Penangkal Petir (R=150 m) Rp 11,800,000.00
37 Pemasangan 1 Bh Fire Extinguisher 5 kg, ABC Rp 625,000.00
38 Penyambungan Daya PLN 66 kVa Rp 63,954,000.00
39 Pekerjaan 1 Unit Genzet 131 kVa Cummins (Silent Type) Komplit Rp 237,000,000.00
40 Pemasangan Lampu Kapal Rp 159,740.00
41 Pemasangan Lampu SL Rp 99,740.00
42 Pemasangan Tangki Bahan Bakar Genzet 2000 L Rp 23,700,000.00
43 Instalasi Pemipaan Bahan Bakar Genzet Rp 6,850,000.00
44 Pekerjaan Pompa Bahan Bakar Electric Rp 20,325,000.00
45 Pekerjaan Panel Pompa Bahan Bakar Rp 4,000,000.00
46 Pekerjaan Pompa Manual Bahan Bakar Rp 6,950,000.00
47 Pekerjaan Load Bank Test Rp 13,100,000.00
NO JENIS PEKERJAAN HARGA
P ANALISA MEKANIKAL PLUMBING
1 Pemasangan 1 m pipa PVC tipe AW dia.150/ 6" Rp 382,520.00
2 Pemasangan 1 m pipa PVC tipe AW dia.100/ 5" Rp 242,990.00
3 Pemasangan 1 m pipa PVC tipe AW dia.100/ 4" Rp 152,650.00
4 Pemasangan 1 m pipa PVC tipe AW dia. 80/ 3" Rp 105,890.00
5 Pemasangan 1 m pipa PVC tipe AW dia. 65/ 2,5" Rp 83,490.00
6 Pemasangan 1 m pipa PVC tipe AW dia. 50/ 2" Rp 56,560.00
7 Pemasangan 1 m pipa PVC tipe AW dia. 40/ 1 1/2" Rp 48,600.00
8 Pemasangan 1m pipa PVC tipe AW dia. 32/ 1 1/4" Rp 44,400.00
9 Pemasangan pipa 1m PVC tipe AW dia. 25/ 1" Rp 29,570.00
10 Pemasangan pipa 1m PVC tipe AW dia. 1/2" Rp 21,810.00
11 Pemasangan 1 Bh Closet Duduk Rp 4,928,660.00
12 Pemasangan 1 Bh Wastafel Rp 2,149,650.00
13 Pemasangan 1 Bh Bak Cuci Piring Stainless Steel Rp 581,370.00
14 Pemasangan 1 Bh Shower Spray Rp 374,280.00
15 Pemasangan 1 Bh Plastic Paper Holder Rp 472,640.00
16 Stop Kran dia 1/2 " Rp 218,160.00
17 Pemasangan 1 Bh Floor Drain Rp 425,440.00
18 Pekerjaan 1 Bh Pipa Biopori 4 (1 m) Rp 57,800.00
19 Pekerjaan 1 Bh Dop Pipa Biopori 4" Rp 5,500.00
20 Pekerjaan 1 Bh Valve Taman Rp 307,200.00
21 Pekerjaan 1 Unit STP Rp 83,341,000.00
22 Pekerjaan 1 Unit Collecting Tank (Bio Tank) Rp 6,341,000.00
23 Pekerjaan 1 Set Pompa Irigasi Rp 31,541,000.00
24 1 Set Pek. Pas. Water Pump 65_10_3 Rp 7,794,190.00
25 1 Set Pek. Pas. Water Pump 65 13 4 Rp 8,522,400.00
26 1 Set Pek. Pas. Water Pump 65 7 22 Rp 5,921,650.00
27 1 Set Pek. Pas. Water Pump 65 100 45 Rp 181,993,740.00
28 1 Bh Pek. Ball Valve DN 25 mm Rp 151,100.00
29 1 Bh Pek. Ball Valve DN 40 mm Rp 274,600.00
30 1 Set Circular Swing DN 25 mm Rp 3,004,000.00
31 1 Set Music Mixer 8 Way Output Rp 12,324,200.00
32 1 Set Outdoor All Weather Sound Rp 12,825,200.00
33 1 Bh Lampu LED 24 V 10 W Rp 1,051,700.00
34 1 Bh Mounting Bracket Rp 556,100.00
35 1 Bh Pipa PPR PN 20 Rp 205,370.00
36 1 Bh Pipa PPR PN 25 Rp 249,550.00
37 1 Bh Pipa PPR PN 40 Rp 552,260.00
38 1 Bh Pipa PPR PN 80 Rp 3,506,960.00
39 1 Set Music Program Automatic Rp 266,363,710.00
40 1 Bh Selenoid Valve DN 25 Rp 1,682,960.00
41 1 Set Connection Pipa DN 25 Rp 79,420.00
42 1 Set Connection Pipa DN 40 Rp 139,420.00
43 1 Set Acoustic Enclosure Rp 5,510,600.00
44 1 Set PLC 60 XP Rp 9,468,500.00
45 1 Set Projectors Rp 9,468,500.00
46 1 Set Waterscreen Rp 147,439,490.00
47 1 Set Flange Connector DN 89 SS304 Rp 259,670.00
48 1 Set Nozzle Jet Connector DN273 SS 304 Rp 5,410,760.00
49 1 Set Pipa Stainless Steel Rp 106,211,600.00
50 1 Set Pasangan Kabel Rp 32,587,600.00
51 1 Set Under Swing Motor Rp 12,725,000.00
52 1 Set Pompa Atman HA 35 Rp 2,705,000.00
53 1 Set Computer Rp 21,642,800.00
54 Pembuatan 1 Unit Sumur Bor Rp 30,000,000.00
55 Pekerjaan 1 Set Submersible Deep Well Pump Rp 27,400,000.00
56 Pekerjaan 1 Unit Tower Tank 1,5 m3 Rp 7,600,000.00
NO JENIS PEKERJAAN HARGA
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
TAHUN 2020

A. HARGA PEKERJAAN BONGKARAN DAN PERSIAPAN


A.1 1 m3 Pembongkaran Beton Bertulang
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 13.334 Rp 101,500.00 Rp 1,353,401.00
Mandor L.17 OH 0.666 Rp 158,000.00 Rp 105,228.00
JUMLAH TENAGA KERJA Rp 1,458,629.00
D. Jumlah (A + B + C) Rp 1,458,629.00
E. Overhead & Profit Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 1,458,629.00

A.2 10 m2 Membokar Usuk Reng


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Tukang Kayu L.01 OH 0.250 Rp 122,100.00 Rp 30,525.00
Mandor L.17 OH 0.025 Rp 140,200.00 Rp 3,505.00
JUMLAH TENAGA KERJA Rp 34,030.00
D. Jumlah (A + B + C) Rp 34,030.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 34,030.00

Harga M2 Rp 3,403.00

A.3 10 m2 Mengupas Plesteran


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.500 Rp 77,900.00 Rp 38,950.00
Mandor L.17 OH 0.025 Rp 140,200.00 Rp 3,505.00
JUMLAH TENAGA KERJA Rp 42,455.00
D. Jumlah (A + B + C) Rp 42,455.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 42,455.00
Harga M2 Rp 4,245.50
A.2 1m2 Pembongkaran Tembok Bata
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 6.667 Rp 101,500.00 Rp 676,700.50
Mandor L.17 OH 0.333 Rp 158,000.00 Rp 52,614.00
JUMLAH TENAGA KERJA Rp 729,314.50
D. Jumlah (A + B + C) Rp 729,314.50
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 729,314.50

A.5 10 m2 Membongkar Lantai


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 2.000 Rp 77,900.00 Rp 155,800.00
Mandor L.17 OH 0.100 Rp 140,200.00 Rp 14,020.00
JUMLAH TENAGA KERJA Rp 169,820.00
D. Jumlah (A + B + C) Rp 169,820.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 169,820.00
Harga M2 Rp 16,982.00

A.6 10 m2 Menurunkan Atap Genteng Rp 140,200.00


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.000 Rp 77,900.00 Rp 77,900.00
Tukang Batu L.02 OH 0.500 Rp 111,700.00 Rp 55,850.00
JUMLAH TENAGA KERJA Rp 133,750.00
D. Jumlah (A + B + C) Rp 133,750.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 133,750.00
Harga M2 Rp 13,375.00

A.7 10 m2 Menurunkan Atap Seng


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.000 Rp 77,900.00 Rp 77,900.00
Tukang Besi L.08 OH 0.500 Rp 109,100.00 Rp 54,550.00
JUMLAH TENAGA KERJA Rp 132,450.00
D. Jumlah (A + B + C) Rp 132,450.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 132,450.00
Harga M2 Rp 13,245.00
A.8 Pengukuran dan Pasang 1 m' Bouwplank
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.100 Rp 101,500.00 Rp 10,150.00
Tukang Kayu L.04 OH 0.100 Rp 140,800.00 Rp 14,080.00
Kepala Tukang L.05 OH 0.010 Rp 152,300.00 Rp 1,523.00
Mandor L.17 OH 0.005 Rp 158,000.00 Rp 790.00
JUMLAH TENAGA KERJA Rp 26,543.00
B. BAHAN
Kayu seseh m3 0.012 Rp 4,032,000.00 Rp 48,384.00
Paku 2-3 Kg 0.020 Rp 18,900.00 Rp 378.00
Papan begesting 2/20 m3 0.007 Rp 1,060,200.00 Rp 7,421.40
JUMLAH HARGA BAHAN Rp 56,183.40
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 82,726.40
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 82,726.40

A.9 25 m' Pengukuran dan Pasang Papan Bouwpalank Jalan / Rabat Beton/ Trotoar
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.050 Rp 77,900.00 Rp 3,895.00
Tukang Kayu L.04 OH 0.050 Rp 122,100.00 Rp 6,105.00
Kepala Tukang L.05 OH 0.005 Rp 132,400.00 Rp 662.00
Mandor L.17 OH 0.005 Rp 140,200.00 Rp 701.00
JUMLAH TENAGA KERJA Rp 11,363.00
B. BAHAN
Kayu Seseh m3 0.048 Rp 2,017,900.00 Rp 96,859.20
Paku Usuk m3 0.020 Rp 18,300.00 Rp 366.00
JUMLAH HARGA BAHAN Rp 97,225.20
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 108,588.20
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 108,588.20
Harga M' Rp 4,343.53
A.4 1 m' Pasangan Bekisting Beton Rabat
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.050 Rp 101,500.00 Rp 5,075.00
Tukang Kayu L.04 OH 0.020 Rp 140,800.00 Rp 2,816.00
Kepala Tukang L.05 OH 0.005 Rp 152,300.00 Rp 761.50
Mandor L.17 OH 0.005 Rp 158,000.00 Rp 790.00
JUMLAH TENAGA KERJA Rp 9,442.50
B. BAHAN
Reng meranti m3 0.001 Rp 7,416,000.00 Rp 7,416.00
Paku 2-3 Kg 0.020 Rp 18,900.00 Rp 378.00
Papan begesting 3/20 m3 0.003 Rp 866,800.00 Rp 2,600.40
JUMLAH HARGA BAHAN Rp 10,394.40
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 19,836.90
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 19,836.90
5 x Pakai Rp 3,967.38

B HARGA SATUAN PEKERJAAN TANAH


B.1 Penggalian 1 m3 Tanah Biasa Sedalam 1 m
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.750 Rp 101,500.00 Rp 76,125.00
Mandor L17 OH 0.025 Rp 158,000.00 Rp 3,950.00
JUMLAH TENAGA KERJA Rp 80,075.00
B. BAHAN
JUMLAH HARGA BAHAN Rp -
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 80,075.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 80,075.00
1 M3 Galian Tanah Biasa Dalam Terowongan ( 5x) Rp 400,375.00
B.2 Penggalian 1 m3 Tanah Biasa Sedalam 2 m
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.900 Rp 101,500.00 Rp 91,350.00
Mandor L.17 OH 0.045 Rp 158,000.00 Rp 7,110.00
JUMLAH TENAGA KERJA Rp 98,460.00
B. BAHAN
JUMLAH HARGA BAHAN Rp -
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 98,460.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 98,460.00
1 M3 Galian Tanah Biasa Dalam Terowongan ( 5x) Rp 492,300.00

B.3 Penggalian 1 m3 Tanah Lumpur /Sediman Sedalam 1 m Tertutup


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.200 Rp 101,500.00 Rp 121,800.00
Mandor L.17 OH 0.045 Rp 158,000.00 Rp 7,110.00
JUMLAH TENAGA KERJA Rp 128,910.00
B. BAHAN
JUMLAH HARGA BAHAN Rp -
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 128,910.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 128,910.00

B.4 Penggalian 1 m3 Tanah Lumpur /Sediman Sedalam 1 m Terbuka


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.750 Rp 101,500.00 Rp 76,125.00
Mandor L.17 OH 0.025 Rp 158,000.00 Rp 3,950.00
JUMLAH TENAGA KERJA Rp 80,075.00
B. BAHAN
JUMLAH HARGA BAHAN Rp -
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 80,075.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 80,075.00
B.5 Penggalian 1 m3 Tanah Lumpur Sedalam 1 m
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.200 Rp 101,500.00 Rp 121,800.00
Mandor L.17 OH 0.045 Rp 158,000.00 Rp 7,110.00
JUMLAH TENAGA KERJA Rp 128,910.00
B. BAHAN
JUMLAH HARGA BAHAN Rp -
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 128,910.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 128,910.00

B.6 Penggalian 1 m3 Tanah Keras Dalam 1 m


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.000 Rp 101,500.00 Rp 101,500.00
Mandor L.17 OH 0.032 Rp 158,000.00 Rp 5,056.00
JUMLAH TENAGA KERJA Rp 106,556.00
B. BAHAN
JUMLAH HARGA BAHAN Rp -
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 106,556.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 106,556.00
1 M3 Galian Tanah Biasa Dalam Terowongan ( 5x) Rp 532,780.00

B.7 Mengerjakan 1 m2 Stripping Tebing Setinggi 1m


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.050 Rp 101,500.00 Rp 5,075.00
Mandor L.17 OH 0.005 Rp 158,000.00 Rp 790.00
JUMLAH TENAGA KERJA Rp 5,865.00
B. BAHAN
JUMLAH HARGA BAHAN Rp -
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 5,865.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 5,865.00
B.8 Pengurugan Kembali 1 m3 Galian Tanah
Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.500 Rp 101,500.00 Rp 50,750.00
Mandor L.17 OH 0.050 Rp 158,000.00 Rp 7,900.00
JUMLAH TENAGA KERJA Rp 58,650.00
B. BAHAN
JUMLAH HARGA BAHAN Rp -
C. PERALATAN
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 58,650.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 58,650.00

B.9 Pengurugan 1 m3 Dengan Tanah urug + Di Padatkan


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.300 Rp 101,500.00 Rp 30,450.00
Mandor L.17 OH 0.010 Rp 158,000.00 Rp 1,580.00
JUMLAH TENAGA KERJA Rp 32,030.00
B. BAHAN
Tanah urug m3 1.200 Rp 81,900.00 Rp 98,280.00
JUMLAH HARGA BAHAN Rp 98,280.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 130,310.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 130,310.00
B.10 Pengurugan 1 m3 Dengan Pasir Urug
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.300 Rp 101,500.00 Rp 30,450.00
Mandor L.17 OH 0.010 Rp 158,000.00 Rp 1,580.00
JUMLAH TENAGA KERJA Rp 32,030.00
B. BAHAN
Pasir Urug m3 1.200 Rp 152,100.00 Rp 182,520.00
JUMLAH HARGA BAHAN Rp 182,520.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 214,550.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 214,550.00

B.11 1 m3 Membuang Tanah Sisa Galian /Lumpur Sampah Keluar Lokasi Sejauh 30 m'
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.330 Rp 101,500.00 Rp 33,495.00
Mandor L.17 OH 0.010 Rp 158,000.00 Rp 1,580.00
JUMLAH TENAGA KERJA Rp 35,075.00
B. BAHAN
JUMLAH HARGA BAHAN Rp -
C. PERALATAN
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 35,075.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 35,075.00

B.12 1 m3 Membuang Tanah Sisa Galian /Lumpur Sampah Keluar Lokasi lebih dari 30 m'/D 100 m'
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.330 Rp 101,500.00 Rp 33,495.00
Mandor L.17 OH 0.010 Rp 158,000.00 Rp 1,580.00
JUMLAH TENAGA KERJA Rp 35,075.00
B. BAHAN
JUMLAH HARGA BAHAN Rp -
C. PERALATAN
Ongkos Kendaraan ls 1.000 Rp 50,000.00 Rp 50,000.00
JUMLAH HARGA ALAT Rp 50,000.00

D. Jumlah (A + B + C) Rp 85,075.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 85,075.00
C HARGA SATUAN PEKERJAAN PONDASI
C.1 Pemasangan 1 m3 Pasangan Batu Kosong
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.780 Rp 101,500.00 Rp 79,170.00
Tukang Batu L.02 OH 0.390 Rp 133,600.00 Rp 52,104.00
Kepala Tukang L.03 OH 0.039 Rp 147,900.00 Rp 5,768.10
Mandor L.17 OH 0.039 Rp 158,000.00 Rp 6,162.00
JUMLAH TENAGA KERJA Rp 143,204.10
B. BAHAN
Batu kali m3 1.200 Rp 252,000.00 Rp 302,400.00
Pasir Urug m3 0.432 Rp 152,100.00 Rp 65,707.20
JUMLAH HARGA BAHAN Rp 368,107.20
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 511,311.30
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 511,311.30

C.2 Pemasangan 1 m3 Pondasi Batu Kali Campuran 1SP :3PP


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.500 Rp 101,500.00 Rp 152,250.00
Tukang Batu L.02 OH 0.750 Rp 133,600.00 Rp 100,200.00
Kepala Tukang L.03 OH 0.075 Rp 147,900.00 Rp 11,092.50
Mandor L.17 OH 0.075 Rp 158,000.00 Rp 11,850.00
JUMLAH TENAGA KERJA Rp 275,392.50
B. BAHAN
Batu kali m3 1.200 Rp 252,000.00 Rp 302,400.00
Semen Portland Kg 202.000 Rp 1,485.00 Rp 299,970.00
Pasir Pasang m3 0.485 Rp 207,900.00 Rp 100,831.50
JUMLAH HARGA BAHAN Rp 703,201.50
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 978,594.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 978,594.00
C.3 Pemasangan 1 m3 Pondasi Batu Kali Campuran 1SP : 5PP
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.500 Rp 101,500.00 Rp 152,250.00
Tukang Batu L.02 OH 0.750 Rp 133,600.00 Rp 100,200.00
Kepala Tukang L.03 OH 0.075 Rp 147,900.00 Rp 11,092.50
Mandor L.17 OH 0.075 Rp 158,000.00 Rp 11,850.00
JUMLAH TENAGA KERJA Rp 275,392.50
B. BAHAN
Batu kali m3 1.200 Rp 252,000.00 Rp 302,400.00
Semen Portland Kg 136.000 Rp 1,485.00 Rp 201,960.00
Pasir Pasang m3 0.544 Rp 207,900.00 Rp 113,097.60
JUMLAH HARGA BAHAN Rp 617,457.60
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 892,850.10
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 892,850.10

D Harga satuan pasangan dinding


D.1 Pemasangan 1 m2 Batako 1 : 5 cetak lobang
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.320 Rp 101,500.00 Rp 32,480.00
Tukang Batu L.02 OH 0.100 Rp 133,600.00 Rp 13,360.00
Kepala Tukang L.03 OH 0.010 Rp 147,900.00 Rp 1,479.00
Mandor L.17 OH 0.015 Rp 158,000.00 Rp 2,370.00
JUMLAH TENAGA KERJA Rp 49,689.00
B. BAHAN
Batako Bh 12.500 Rp 2,500.00 Rp 31,250.00
Semen Portland Kg 7.500 Rp 1,485.00 Rp 11,137.50
Pasir Pasang M3 0.027 Rp 207,900.00 Rp 5,613.30
JUMLAH HARGA BAHAN Rp 48,000.80
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 97,689.80
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 97,689.80
D.2 Pemasangan 1 m² Dinding Bata Merah (5x11x22) cm Tebal 1 Batu Campuran 1 SP : 3 PP
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.600 Rp 101,500.00 Rp 60,900.00
Tukang Batu L.02 OH 0.200 Rp 133,600.00 Rp 26,720.00
Kepala Tukang L.03 OH 0.020 Rp 147,900.00 Rp 2,958.00
Mandor L.18 OH 0.030 Rp 158,000.00 Rp 4,740.00
JUMLAH TENAGA KERJA Rp 95,318.00
B. BAHAN
Bata Merah biji 140.000 Rp 1,700.00 Rp 238,000.00
Semen Portland kg 32.950 Rp 1,485.00 Rp 48,930.75
Pasir Pasang m³ 0.091 Rp 207,900.00 Rp 18,918.90
JUMLAH HARGA BAHAN Rp 305,849.65
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 401,167.65
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 401,167.65

D.3 Pemasangan 1 m² Dinding Bata Merah (5x11x22) cm tebal 1 Batu Campuran 1 SP : 4 PP


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.600 Rp 101,500.00 Rp 60,900.00
Tukang Batu L.02 OH 0.200 Rp 133,600.00 Rp 26,720.00
Kepala Tukang L.03 OH 0.020 Rp 147,900.00 Rp 2,958.00
Mandor L.17 OH 0.030 Rp 158,000.00 Rp 4,740.00
JUMLAH TENAGA KERJA Rp 95,318.00
B. BAHAN
Bata Merah biji 140.000 Rp 1,700.00 Rp 238,000.00
Semen Portland kg 26.550 Rp 1,485.00 Rp 39,426.75
Pasir Pasang m³ 0.093 Rp 207,900.00 Rp 19,334.70
JUMLAH HARGA BAHAN Rp 296,761.45
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 392,079.45
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 392,079.45
D.4 Pemasangan 1 m² Dinding Bata Merah (5x11x22) cm Tebal 1 Batu Campuran 1 SP : 5 PP
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.600 Rp 101,500.00 Rp 60,900.00
Tukang Batu L.02 OH 0.200 Rp 133,600.00 Rp 26,720.00
Kepala Tukang L.03 OH 0.020 Rp 147,900.00 Rp 2,958.00
Mandor L.17 OH 0.030 Rp 158,000.00 Rp 4,740.00
JUMLAH TENAGA KERJA Rp 95,318.00
B. BAHAN
Bata Merah biji 140.000 Rp 1,700.00 Rp 238,000.00
Semen Portland kg 22.200 Rp 1,485.00 Rp 32,967.00
Pasir Pasang m³ 0.102 Rp 207,900.00 Rp 21,205.80
JUMLAH HARGA BAHAN Rp 292,172.80
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 387,490.80
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 387,490.80

D.5 Pemasangan 1 m² Dinding Bata Merah (5x11x22) cm Tebal 1 Batu Campuran 1 SP : 6 PP


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.600 Rp 101,500.00 Rp 60,900.00
Tukang Batu L.02 OH 0.200 Rp 133,600.00 Rp 26,720.00
Kepala Tukang L.03 OH 0.020 Rp 147,900.00 Rp 2,958.00
Mandor L.17 OH 0.030 Rp 158,000.00 Rp 4,740.00
JUMLAH TENAGA KERJA Rp 95,318.00
B. BAHAN
Bata Merah biji 140.000 Rp 1,700.00 Rp 238,000.00
Semen Portland kg 18.500 Rp 1,485.00 Rp 27,472.50
Pasir Pasang m³ 0.122 Rp 207,900.00 Rp 25,363.80
JUMLAH HARGA BAHAN Rp 290,836.30
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 386,154.30
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 386,154.30
D.6 Pemasangan 1 m² Dinding Bata Merah (5x11x22) cm Tebal ½ Batu Campuran 1 SP : 2 PP
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.300 Rp 101,500.00 Rp 30,450.00
Tukang Batu L.02 OH 0.100 Rp 133,600.00 Rp 13,360.00
Kepala Tukang L.03 OH 0.010 Rp 147,900.00 Rp 1,479.00
Mandor L.17 OH 0.015 Rp 158,000.00 Rp 2,370.00
JUMLAH TENAGA KERJA Rp 47,659.00
B. BAHAN
Bata Merah biji 70.000 Rp 1,700.00 Rp 119,000.00
Semen Portland kg 18.950 Rp 1,485.00 Rp 28,140.75
Pasir Pasang m³ 0.038 Rp 207,900.00 Rp 7,900.20
JUMLAH HARGA BAHAN Rp 155,040.95
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 202,699.95
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 202,699.95

D.7 Pemasangan 1 m² Dinding Bata Merah (5x11x22) cm Tebal ½ Batu Campuran 1 SP : 3 PP


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.300 Rp 101,500.00 Rp 30,450.00
Tukang Batu L.02 OH 0.100 Rp 133,600.00 Rp 13,360.00
Kepala Tukang L.03 OH 0.010 Rp 147,900.00 Rp 1,479.00
Mandor L.17 OH 0.015 Rp 158,000.00 Rp 2,370.00
JUMLAH TENAGA KERJA Rp 47,659.00
B. BAHAN
Bata Merah biji 70.000 Rp 1,700.00 Rp 119,000.00
Semen Portland kg 14.370 Rp 1,485.00 Rp 21,339.45
Pasir Pasang m³ 0.040 Rp 207,900.00 Rp 8,316.00
JUMLAH HARGA BAHAN Rp 148,655.45
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 196,314.45
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 196,314.45
D.8 Pemasangan 1 m² Dinding Bata Merah (5x11x22) cm Tebal ½ Batu Campuran 1 SP : 4 PP
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.300 Rp 101,500.00 Rp 30,450.00
Tukang Batu L.02 OH 0.100 Rp 133,600.00 Rp 13,360.00
Kepala Tukang L.03 OH 0.010 Rp 147,900.00 Rp 1,479.00
Mandor L.17 OH 0.015 Rp 158,000.00 Rp 2,370.00
JUMLAH TENAGA KERJA Rp 47,659.00
B. BAHAN
Bata Merah biji 70.000 Rp 1,700.00 Rp 119,000.00
Semen Portland kg 11.500 Rp 1,485.00 Rp 17,077.50
Pasir Pasang m³ 0.043 Rp 207,900.00 Rp 8,939.70
JUMLAH HARGA BAHAN Rp 145,017.20
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A + B + C) Rp 192,676.20
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 192,676.20

D.9 Pemasangan 1 m² Dinding Bata Merah (5x11x22) cm Tebal ½ Batu Campuran 1 SP : 5 PP


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.300 Rp 101,500.00 Rp 30,450.00
Tukang Batu L.02 OH 0.100 Rp 133,600.00 Rp 13,360.00
Kepala Tukang L.03 OH 0.010 Rp 147,900.00 Rp 1,479.00
Mandor L.17 OH 0.015 Rp 158,000.00 Rp 2,370.00
JUMLAH TENAGA KERJA Rp 47,659.00
B. BAHAN
Bata Merah biji 70.000 Rp 1,700.00 Rp 119,000.00
Semen Portland kg 9.680 Rp 1,485.00 Rp 14,374.80
Pasir Pasang m³ 0.045 Rp 207,900.00 Rp 9,355.50
JUMLAH HARGA BAHAN Rp 142,730.30
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 190,389.30
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 190,389.30
D.10 Pemasangan 1 m² Dinding Bata Merah (5x11x22) cm Tebal ½ Batu Campuran 1 SP : 6 PP
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.300 Rp 101,500.00 Rp 30,450.00
Tukang Batu L.02 OH 0.100 Rp 133,600.00 Rp 13,360.00
Kepala Tukang L.03 OH 0.010 Rp 147,900.00 Rp 1,479.00
Mandor L.17 OH 0.015 Rp 158,000.00 Rp 2,370.00
JUMLAH TENAGA KERJA Rp 47,659.00
B. BAHAN
Bata Merah biji 70.000 Rp 1,700.00 Rp 119,000.00
Semen Portland kg 8.320 Rp 1,485.00 Rp 12,355.20
Pasir Pasang m³ 0.049 Rp 207,900.00 Rp 10,187.10
JUMLAH HARGA BAHAN Rp 141,542.30
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 189,201.30
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 189,201.30

D.11 Pemasangan 1 m² Dinding Bata Merah (5x11x22) cm Tebal ½ Batu Campuran 1 SP : 8 PP


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.300 Rp 101,500.00 Rp 30,450.00
Tukang Batu L.02 OH 0.100 Rp 133,600.00 Rp 13,360.00
Kepala Tukang L.03 OH 0.010 Rp 147,900.00 Rp 1,479.00
Mandor L.17 OH 0.015 Rp 158,000.00 Rp 2,370.00
JUMLAH TENAGA KERJA Rp 47,659.00
B. BAHAN
Bata Merah biji 70.000 Rp 1,700.00 Rp 119,000.00
Semen Portland kg 6.500 Rp 1,485.00 Rp 9,652.50
Pasir Pasang m³ 0.050 Rp 207,900.00 Rp 10,395.00
JUMLAH HARGA BAHAN Rp 139,047.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 186,706.50
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 186,706.50
E HARGA SATUAN PEKERJAAN PLESTERAN, ACIAN DAN PASANGAN
E.1 Pemasangan 1 m² Plesteran 1 SP : 2 PP tebal 15 mm
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.300 Rp 101,500.00 Rp 30,450.00
Tukang Batu L.02 OH 0.150 Rp 133,600.00 Rp 20,040.00
Kepala Tukang L.03 OH 0.015 Rp 147,900.00 Rp 2,218.50
Mandor L.17 OH 0.015 Rp 158,000.00 Rp 2,370.00
JUMLAH TENAGA KERJA Rp 55,078.50
B. BAHAN
Semen Portland kg 10.224 Rp 1,485.00 Rp 15,182.64
Pasir Pasang m³ 0.020 Rp 207,900.00 Rp 4,158.00
JUMLAH HARGA BAHAN Rp 19,340.64
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 74,419.14
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 74,419.14

E.2 Pemasangan 1 m² Plesteran 1 SP : 3 PP tebal 15 mm


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.300 Rp 101,500.00 Rp 30,450.00
Tukang Batu L.02 OH 0.150 Rp 133,600.00 Rp 20,040.00
Kepala Tukang L.03 OH 0.015 Rp 147,900.00 Rp 2,218.50
Mandor L.17 OH 0.015 Rp 158,000.00 Rp 2,370.00
JUMLAH TENAGA KERJA Rp 55,078.50
B. BAHAN
Semen Portland kg 7.776 Rp 1,485.00 Rp 11,547.36
Pasir Pasang m³ 0.023 Rp 207,900.00 Rp 4,781.70
JUMLAH HARGA BAHAN Rp 16,329.06
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 71,407.56
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 71,407.56
E.3 Pemasangan 1 m² Plesteran 1 SP : 4 PP tebal 15 mm
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.300 Rp 101,500.00 Rp 30,450.00
Tukang Batu L.02 OH 0.150 Rp 133,600.00 Rp 20,040.00
Kepala Tukang L.03 OH 0.015 Rp 147,900.00 Rp 2,218.50
Mandor L.17 OH 0.015 Rp 158,000.00 Rp 2,370.00
JUMLAH TENAGA KERJA Rp 55,078.50
B. BAHAN
Semen Portland kg 6.240 Rp 1,485.00 Rp 9,266.40
Pasir Pasang m³ 0.024 Rp 207,900.00 Rp 4,989.60
JUMLAH HARGA BAHAN Rp 14,256.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 69,334.50
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 69,334.50

E.4 Pemasangan 1 m² Plesteran 1 SP : 5 PP tebal 15 mm


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.300 Rp 101,500.00 Rp 30,450.00
Tukang Batu L.02 OH 0.150 Rp 133,600.00 Rp 20,040.00
Kepala Tukang L.03 OH 0.015 Rp 147,900.00 Rp 2,218.50
Mandor L.17 OH 0.015 Rp 158,000.00 Rp 2,370.00
JUMLAH TENAGA KERJA Rp 55,078.50
B. BAHAN
Semen Portland kg 5.184 Rp 1,485.00 Rp 7,698.24
Pasir Pasang m³ 0.026 Rp 207,900.00 Rp 5,405.40
JUMLAH HARGA BAHAN Rp 13,103.64
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 68,182.14
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 68,182.14
E.5 Pemasangan 1 m² Plesteran 1 SP : 6 PP tebal 15 mm
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.300 Rp 101,500.00 Rp 30,450.00
Tukang Batu L.02 OH 0.150 Rp 133,600.00 Rp 20,040.00
Kepala Tukang L.03 OH 0.015 Rp 147,900.00 Rp 2,218.50
Mandor L.17 OH 0.015 Rp 158,000.00 Rp 2,370.00
JUMLAH TENAGA KERJA Rp 55,078.50
B. BAHAN
Semen Portland kg 4.416 Rp 1,485.00 Rp 6,557.76
Pasir Pasang m³ 0.027 Rp 207,900.00 Rp 5,613.30
JUMLAH HARGA BAHAN Rp 12,171.06
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 67,249.56
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 67,249.56

E.6 Pemasangan 1 m² Plesteran 1 SP : 7 PP tebal 15 mm


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.300 Rp 101,500.00 Rp 30,450.00
Tukang Batu L.02 OH 0.150 Rp 133,600.00 Rp 20,040.00
Kepala Tukang L.03 OH 0.015 Rp 147,900.00 Rp 2,218.50
Mandor L.17 OH 0.015 Rp 158,000.00 Rp 2,370.00
JUMLAH TENAGA KERJA Rp 55,078.50
B. BAHAN
Semen Portland kg 3.936 Rp 1,485.00 Rp 5,844.96
Pasir Pasang m³ 0.028 Rp 207,900.00 Rp 5,821.20
JUMLAH HARGA BAHAN Rp 11,666.16
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 66,744.66
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 66,744.66
E.7 Pemasangan 1 m² Plesteran 1 SP : 8 PP tebal 15 mm
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.300 Rp 101,500.00 Rp 30,450.00
Tukang Batu L.02 OH 0.150 Rp 133,600.00 Rp 20,040.00
Kepala Tukang L.03 OH 0.015 Rp 147,900.00 Rp 2,218.50
Mandor L.17 OH 0.015 Rp 158,000.00 Rp 2,370.00
JUMLAH TENAGA KERJA Rp 55,078.50
B. BAHAN
Semen Portland kg 3.456 Rp 1,485.00 Rp 5,132.16
Pasir Pasang m³ 0.029 Rp 207,900.00 Rp 6,029.10
JUMLAH HARGA BAHAN Rp 11,161.26
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 66,239.76
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 66,239.76

E.8 Pemasangan 1 m² Plesteran 1 SP : 3 PP tebal 20 mm


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.260 Rp 101,500.00 Rp 26,390.00
Tukang Batu L.02 OH 0.200 Rp 133,600.00 Rp 26,720.00
Kepala Tukang L.03 OH 0.020 Rp 147,900.00 Rp 2,958.00
Mandor L.17 OH 0.013 Rp 158,000.00 Rp 2,054.00
JUMLAH TENAGA KERJA Rp 58,122.00
B. BAHAN
Semen Portland kg 10.368 Rp 1,485.00 Rp 15,396.48
Pasir Pasang m³ 0.031 Rp 207,900.00 Rp 6,444.90
JUMLAH HARGA BAHAN Rp 21,841.38
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 79,963.38
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 79,963.38
E.9 Pemasangan 1 m² Plesteran 1 SP : 4 PP tebal 20 mm
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.400 Rp 101,500.00 Rp 40,600.00
Tukang Batu L.02 OH 0.200 Rp 133,600.00 Rp 26,720.00
Kepala Tukang L.03 OH 0.020 Rp 147,900.00 Rp 2,958.00
Mandor L.17 OH 0.022 Rp 158,000.00 Rp 3,476.00
JUMLAH TENAGA KERJA Rp 73,754.00
B. BAHAN
Semen Portland kg 8.320 Rp 1,485.00 Rp 12,355.20
Pasir Pasang m³ 0.032 Rp 207,900.00 Rp 6,652.80
JUMLAH HARGA BAHAN Rp 19,008.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 92,762.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 92,762.00

E.10 Pemasangan 1 m² Plesteran 1 SP : 5 PP tebal 20 mm


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.400 Rp 101,500.00 Rp 40,600.00
Tukang Batu L.02 OH 0.200 Rp 133,600.00 Rp 26,720.00
Kepala Tukang L.03 OH 0.020 Rp 147,900.00 Rp 2,958.00
Mandor L.17 OH 0.022 Rp 158,000.00 Rp 3,476.00
JUMLAH TENAGA KERJA Rp 73,754.00
B. BAHAN
Semen Portland kg 6.912 Rp 1,485.00 Rp 10,264.32
Pasir Pasang m³ 0.035 Rp 207,900.00 Rp 7,276.50
JUMLAH HARGA BAHAN Rp 17,540.82
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 91,294.82
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 91,294.82
E.11 Pemasangan 1 m² Plesteran 1 SP : 6 PP tebal 20 mm
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.400 Rp 101,500.00 Rp 40,600.00
Tukang Batu L.02 OH 0.200 Rp 133,600.00 Rp 26,720.00
Kepala Tukang L.03 OH 0.020 Rp 147,900.00 Rp 2,958.00
Mandor L.17 OH 0.022 Rp 158,000.00 Rp 3,476.00
JUMLAH TENAGA KERJA Rp 73,754.00
B. BAHAN
Semen Portland kg 5.888 Rp 1,485.00 Rp 8,743.68
Pasir Pasang m³ 0.036 Rp 207,900.00 Rp 7,484.40
JUMLAH HARGA BAHAN Rp 16,228.08
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 89,982.08
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 89,982.08

E.12 Pemasangan 1 m² Plesteran ciprat 1SP : 2PP


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.300 Rp 101,500.00 Rp 30,450.00
Tukang Batu L.02 OH 0.100 Rp 133,600.00 Rp 13,360.00
Kepala Tukang L.03 OH 0.010 Rp 147,900.00 Rp 1,479.00
Mandor L.17 OH 0.015 Rp 158,000.00 Rp 2,370.00
JUMLAH TENAGA KERJA Rp 47,659.00
B. BAHAN
Semen Portland kg 4.320 Rp 1,485.00 Rp 6,415.20
Pasir Pasang m³ 0.006 Rp 207,900.00 Rp 1,247.40
JUMLAH HARGA BAHAN Rp 7,662.60
C. PERALATAN a
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 55,321.60
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 55,321.60
E.13 Pemasangan 1 m² Finishing siar Pasangan Bata Merah
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.150 Rp 101,500.00 Rp 15,225.00
Tukang Batu L.02 OH 0.075 Rp 133,600.00 Rp 10,020.00
Kepala Tukang L.03 OH 0.008 Rp 147,900.00 Rp 1,183.20
Mandor L.18 OH 0.008 Rp 158,000.00 Rp 1,264.00
JUMLAH TENAGA KERJA Rp 27,692.20
B. BAHAN
Semen Portland kg 3.018 Rp 1,485.00 Rp 4,481.73
JUMLAH HARGA BAHAN Rp 4,481.73
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 32,173.93
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 32,173.93

E.14 Pemasangan 1 m² finishing siar pasangan batu kali 1 SP : 2PP


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.300 Rp 101,500.00 Rp 30,450.00
Tukang Batu L.02 OH 0.150 Rp 133,600.00 Rp 20,040.00
Kepala Tukang L.03 OH 0.015 Rp 147,900.00 Rp 2,218.50
Mandor L.17 OH 0.015 Rp 158,000.00 Rp 2,370.00
JUMLAH TENAGA KERJA Rp 55,078.50
B. BAHAN
Semen Portland kg 6.340 Rp 1,485.00 Rp 9,414.90
Pasir Pasang m³ 0.012 Rp 207,900.00 Rp 2,494.80
JUMLAH HARGA BAHAN Rp 11,909.70
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 66,988.20
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 66,988.20
E.15 Pemasangan 1 m² acian
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.200 Rp 101,500.00 Rp 20,300.00
Tukang Batu L.02 OH 0.100 Rp 133,600.00 Rp 13,360.00
Kepala Tukang L.03 OH 0.010 Rp 147,900.00 Rp 1,479.00
Mandor L.17 OH 0.010 Rp 158,000.00 Rp 1,580.00
JUMLAH TENAGA KERJA Rp 36,719.00
B. BAHAN
Semen Portland Kg 3.250 Rp 1,485.00 Rp 4,826.25
JUMLAH HARGA BAHAN Rp 4,826.25
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 41,545.25
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 41,545.25

E.16 Pemasangan 1 m² Bata Tulikup tanpa nat


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Tukang Ukir Paras L.12 OH 0.880 Rp 140,800.00 Rp 123,943.59
Kepala Tukang Ukir Style Bali L.24 OH 0.200 Rp 152,300.00 Rp 30,460.00
Pekerja L.01 OH 0.200 Rp 101,500.00 Rp 20,300.00
Mandor L.17 OH 0.010 Rp 158,000.00 Rp 1,580.00
JUMLAH TENAGA KERJA Rp 176,283.59
B. BAHAN
Bata Gosok Kelas I Bj 75.000 Rp 5,400.00 Rp 405,000.00
Semen Portland Kg 30.000 Rp 1,485.00 Rp 44,550.00
JUMLAH HARGA BAHAN Rp 449,550.00
C. PERALATAN
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 625,833.59
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 625,833.59
E.17 Pemasangan 1 m² Plesteran pasir melele
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Tukang Batu L.12 OH 0.200 Rp 133,600.00 Rp 26,720.00
Kepala Tukang L.24 OH 0.020 Rp 147,900.00 Rp 2,958.00
Pekerja L.01 OH 0.025 Rp 101,500.00 Rp 2,537.50
Mandor L.17 OH 0.013 Rp 158,000.00 Rp 2,054.00
JUMLAH TENAGA KERJA Rp 34,269.50
B. BAHAN
Pasir melele m3 0.090 Rp 2,133,000.00 Rp 191,970.00
Semen Portland Kg 11.000 Rp 1,485.00 Rp 16,335.00
JUMLAH HARGA BAHAN Rp 208,305.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 242,574.50
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 242,574.50

E.18 Pemasangan 1 m² Ornamen Pasir melele motif bali


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Tukang Ukir Paras L.12 OH 0.350 Rp 140,800.00 Rp 49,280.00
Kepala Tukang Style Bali L.24 OH 0.350 Rp 152,300.00 Rp 53,305.00
Pekerja L.01 OH 1.800 Rp 101,500.00 Rp 182,700.00
Mandor L.17 OH 0.180 Rp 158,000.00 Rp 28,440.00
JUMLAH TENAGA KERJA Rp 313,725.00
B. BAHAN
Pasir melele m3 0.100 Rp 2,133,000.00 Rp 213,300.00
Semen Portland Kg 6.250 Rp 1,485.00 Rp 9,281.25
JUMLAH HARGA BAHAN Rp 222,581.25
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 536,306.25
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 536,306.25
E.19 Pemasangan 1 m² Pasangan Batu Jogja Tebal 2 cm
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Tukang Ukir Paras L.02 OH 0.350 Rp 140,800.00 Rp 49,280.00
Kepala Tukang Ukir Style Bali L.03 OH 0.035 Rp 152,300.00 Rp 5,330.50
Pekerja L.01 OH 0.700 Rp 101,500.00 Rp 71,050.00
Mandor L.17 OH 0.035 Rp 158,000.00 Rp 5,530.00
JUMLAH TENAGA KERJA Rp 131,190.50
B. BAHAN
Batu Jogja m2 1.100 Rp 105,000.00 Rp 115,500.00
Semen Portland Kg 7.000 Rp 1,485.00 Rp 10,395.00
JUMLAH HARGA BAHAN Rp 125,895.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 257,085.50
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 257,085.50

E.20 Pemasangan 1 m² Palimanan tepi Kolam & Tempat duduk Tebal 5 cm


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Tukang Ukir Paras L.12 OH 0.350 Rp 140,800.00 Rp 49,280.00
Kepala Tukang Ukir Style Bali L.24 OH 0.035 Rp 152,300.00 Rp 5,330.50
Pekerja L.01 OH 0.700 Rp 101,500.00 Rp 71,050.00
Mandor L.17 OH 0.035 Rp 158,000.00 Rp 5,530.00
JUMLAH TENAGA KERJA Rp 131,190.50
B. BAHAN
Palimanan 30/30 T. 5 cm m2 1.200 Rp 193,500.00 Rp 232,200.00
Semen Portland Kg 2.100 Rp 1,485.00 Rp 3,118.50
Pasir Pasang m3 0.011 Rp 207,900.00 Rp 2,286.90
JUMLAH HARGA BAHAN Rp 237,605.40
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 368,795.90
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 368,795.90
E.21 Pemasangan 1 m² Palimanan Lantai Kolam Tebal 2 cm
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Tukang Ukir Paras L.12 OH 0.350 Rp 140,800.00 Rp 49,280.00
Kepala Tukang Ukir Style Bali L.24 OH 0.035 Rp 152,300.00 Rp 5,330.50
Pekerja L.01 OH 0.700 Rp 101,500.00 Rp 71,050.00
Mandor L.17 OH 0.035 Rp 158,000.00 Rp 5,530.00
JUMLAH TENAGA KERJA Rp 131,190.50
B. BAHAN
Palimanan 30/30 T. 2 cm m2 1.200 Rp 193,500.00 Rp 232,200.00
Semen Portland Kg 7.000 Rp 1,485.00 Rp 10,395.00
Pasir Pasang m3 0.025 Rp 207,900.00 Rp 5,197.50
JUMLAH HARGA BAHAN Rp 247,792.50
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 378,983.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 378,983.00

E.22 Pemasangan 1m2 dinding roster 20 x 20 cm campuran 1 SP : 3 PP


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.300 Rp 101,500.00 Rp 30,450.00
Tukang Batu L.02 OH 0.100 Rp 133,600.00 Rp 13,360.00
Kepala Tukang L.03 OH 0.010 Rp 147,900.00 Rp 1,479.00
Mandor L.17 OH 0.015 Rp 158,000.00 Rp 2,370.00
JUMLAH TENAGA KERJA Rp 47,659.00
B. BAHAN
Loster Terawang PC buah 25.000 Rp 17,100.00 Rp 427,500.00
Semen Portland kg 11.000 Rp 1,485.00 Rp 16,335.00
Pasir Pasang m³ 0.035 Rp 207,900.00 Rp 7,276.50
JUMLAH HARGA BAHAN Rp 451,111.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 498,770.50
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 498,770.50
E.23 Pemasangan 1 m2 Paving Stone 20x20x6 cm
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.500 Rp 101,500.00 Rp 50,750.00
Tukang Batu L.02 OH 0.250 Rp 133,600.00 Rp 33,400.00
Kepala Tukang L.03 OH 0.025 Rp 147,900.00 Rp 3,697.50
Mandor L.17 OH 0.025 Rp 158,000.00 Rp 3,950.00
JUMLAH TENAGA KERJA Rp 91,797.50
B. BAHAN
Paving Stone m2 1.000 Rp 111,600.00 Rp 111,600.00
Pasir Urug m3 0.100 Rp 152,100.00 Rp 15,210.00
JUMLAH HARGA BAHAN Rp 126,810.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 218,607.50
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 218,607.50

F HARGA SATUAN PEKERJAAN PASANGAN TUTUP DINDING DAN PENUTUP LANTAI


F.1 Pemasangan 1 m² lantai Tegel warna ukuran 20 cm x 20 cm
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.270 Rp 101,500.00 Rp 27,405.00
Tukang Batu L.02 OH 0.135 Rp 133,600.00 Rp 18,036.00
Kepala Tukang L.03 OH 0.014 Rp 147,900.00 Rp 2,070.60
Mandor L.17 OH 0.014 Rp 158,000.00 Rp 2,212.00
JUMLAH TENAGA KERJA Rp 49,723.60
B. BAHAN
Tegel warna bh 26.500 Rp 3,800.00 Rp 100,700.00
Semen Portland Kg 10.400 Rp 1,485.00 Rp 15,444.00
Pasir Pasang M³ 0.045 Rp 207,900.00 Rp 9,355.50
Semen warna Kg 1.000 Rp 21,600.00 Rp 21,600.00
JUMLAH HARGA BAHAN Rp 147,099.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 196,823.10
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 196,823.10
F.2 Pemasangan 1 m² lantai keramik ukuran 20 cm x 20 cm
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.700 Rp 101,500.00 Rp 71,050.00
Tukang Batu L.02 OH 0.350 Rp 133,600.00 Rp 46,760.00
Kepala Tukang L.03 OH 0.035 Rp 147,900.00 Rp 5,176.50
Mandor L.17 OH 0.035 Rp 158,000.00 Rp 5,530.00
JUMLAH TENAGA KERJA Rp 128,516.50
B. BAHAN
Keramik 20 x 20 bh 26.500 Rp 2,800.00 Rp 74,200.00
Semen Portland Kg 10.400 Rp 1,485.00 Rp 15,444.00
Pasir Pasang M³ 0.045 Rp 207,900.00 Rp 9,355.50
Semen warna Kg 1.620 Rp 21,600.00 Rp 34,992.00
JUMLAH HARGA BAHAN Rp 133,991.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 262,508.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 262,508.00

F.3 Pemasangan 1 m² lantai keramik ukuran 30 cm x30 cm KW 1


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.700 Rp 101,500.00 Rp 71,050.00
Tukang Batu L.02 OH 0.350 Rp 133,600.00 Rp 46,760.00
Kepala Tukang L.03 OH 0.035 Rp 147,900.00 Rp 5,176.50
Mandor L.17 OH 0.035 Rp 158,000.00 Rp 5,530.00
JUMLAH TENAGA KERJA Rp 128,516.50
B. BAHAN
Keramik 30 x 30 bh 11.800 Rp 5,700.00 Rp 67,260.00
Semen Portland Kg 10.000 Rp 1,485.00 Rp 14,850.00
Pasir Pasang M³ 0.045 Rp 207,900.00 Rp 9,355.50
Semen warna Kg 1.500 Rp 21,600.00 Rp 32,400.00
JUMLAH HARGA BAHAN Rp 123,865.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 252,382.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 252,382.00
F.4 Pemasangan 1 m² lantai keramik ukuran 40 cm x 40 cm kw 1
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.700 Rp 101,500.00 Rp 71,050.00
Tukang Batu L.02 OH 0.350 Rp 133,600.00 Rp 46,760.00
Kepala Tukang L.03 OH 0.035 Rp 147,900.00 Rp 5,176.50
Mandor L.17 OH 0.035 Rp 158,000.00 Rp 5,530.00
JUMLAH TENAGA KERJA Rp 128,516.50
B. BAHAN
Keramik 40 x 40 bh 6.630 Rp 13,200.00 Rp 87,516.00
Semen Portland Kg 9.800 Rp 1,485.00 Rp 14,553.00
Pasir Pasang M³ 0.045 Rp 207,900.00 Rp 9,355.50
Semen warna Kg 1.300 Rp 21,600.00 Rp 28,080.00
JUMLAH HARGA BAHAN Rp 139,504.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 268,021.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 268,021.00

F.5 Pemasangan 1 m² lantai ukuran 60 cm x 60 cm (Setara Granito)


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.700 Rp 101,500.00 Rp 71,050.00
Tukang Batu L.02 OH 0.350 Rp 133,600.00 Rp 46,760.00
Kepala Tukang L.03 OH 0.035 Rp 147,900.00 Rp 5,176.50
Mandor L.17 OH 0.035 Rp 158,000.00 Rp 5,530.00
JUMLAH TENAGA KERJA Rp 128,516.50
B. BAHAN
Granito 60 x60 bh 3.100 Rp 79,387.10 Rp 246,100.00
Semen Portland Kg 9.600 Rp 1,485.00 Rp 14,256.00
Pasir Pasang M³ 0.045 Rp 207,900.00 Rp 9,355.50
Semen warna Kg 1.500 Rp 21,600.00 Rp 32,400.00
JUMLAH HARGA BAHAN Rp 302,111.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 430,628.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 430,628.00
F.6 Pemasangan 1 m plint ubin uk. 10x30 cm
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.090 Rp 101,500.00 Rp 9,135.00
Tukang Batu L.02 OH 0.090 Rp 133,600.00 Rp 12,024.00
Kepala Tukang L.03 OH 0.009 Rp 147,900.00 Rp 1,331.10
Mandor L.17 OH 0.005 Rp 158,000.00 Rp 790.00
JUMLAH TENAGA KERJA Rp 23,280.10
B. BAHAN
Plint Keramik bh 3.530 Rp 1,900.00 Rp 6,707.00
Semen Portland Kg 1.140 Rp 1,485.00 Rp 1,692.90
Pasir Pasang M³ 0.003 Rp 207,900.00 Rp 623.70
Semen warna Kg 0.100 Rp 21,600.00 Rp 2,160.00
JUMLAH HARGA BAHAN Rp 11,183.60
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 34,463.70
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 34,463.70

F.7 Pemasangan 1 m plint ubin uk. 10x40 cm


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.090 Rp 101,500.00 Rp 9,135.00
Tukang Batu L.02 OH 0.090 Rp 133,600.00 Rp 12,024.00
Kepala Tukang L.03 OH 0.009 Rp 147,900.00 Rp 1,331.10
Mandor L.17 OH 0.005 Rp 158,000.00 Rp 790.00
JUMLAH TENAGA KERJA Rp 23,280.10
B. BAHAN
Plint Keramik bh 2.650 Rp 2,900.00 Rp 7,685.00
Semen Portland Kg 1.140 Rp 1,485.00 Rp 1,692.90
Pasir Pasang M³ 0.003 Rp 207,900.00 Rp 623.70
Semen warna Kg 0.100 Rp 21,600.00 Rp 2,160.00
JUMLAH HARGA BAHAN Rp 12,161.60
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 35,441.70
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 35,441.70
F.8 Pemasangan 1 m² Dinding keramik ukuran 20 cm x 25 cm
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.900 Rp 101,500.00 Rp 91,350.00
Tukang Batu L.02 OH 0.450 Rp 133,600.00 Rp 60,120.00
Kepala Tukang L.03 OH 0.045 Rp 147,900.00 Rp 6,655.50
Mandor L.17 OH 0.045 Rp 158,000.00 Rp 7,110.00
JUMLAH TENAGA KERJA Rp 165,235.50
B. BAHAN
Ubin keramik bh 21.000 Rp 4,000.00 Rp 84,000.00
Semen Portland Kg 9.300 Rp 1,485.00 Rp 13,810.50
Pasir Pasang M³ 0.018 Rp 207,900.00 Rp 3,742.20
Semen warna Kg 1.300 Rp 21,600.00 Rp 28,080.00
JUMLAH HARGA BAHAN Rp 129,632.70
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 294,868.20
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 294,868.20

G HARGA SATUAN PEKERJAAN BETON, BEKISTING DAN PEMBESIAN


Catatan : Bobot isi pasir = 1400kg/m3, Bobot isi Kerikil = 1350 kg/m3
G.1 Membuat 1 m3 beton mutu F'c=7,4 (K100), slump (12+_ 2) cm,w/c =0,87
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.650 Rp 101,500.00 Rp 167,475.00
Tukang Batu L.02 OH 0.275 Rp 133,600.00 Rp 36,740.00
Kepala Tukang L.03 OH 0.028 Rp 147,900.00 Rp 4,141.20
Mandor L.17 OH 0.083 Rp 158,000.00 Rp 13,114.00
JUMLAH TENAGA KERJA Rp 221,470.20
B. BAHAN
Semen Portland Kg 247.000 Rp 1,485.00 Rp 366,795.00
Pasir Beton Kg 869.000 Rp 147.21 Rp 127,929.21
Kerikil (Maks 30mm) Kg 999.000 Rp 191.33 Rp 191,142.00
Air Liter 215.000 Rp - Rp -
JUMLAH HARGA BAHAN Rp 685,866.21
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 907,336.41
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 907,336.41
G.2 Membuat 1 m3 beton mutu F'c=9,8(K125), slump (12+_ 2) cm,w/c =0,78
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.650 Rp 101,500.00 Rp 167,475.00
Tukang Batu L.02 OH 0.275 Rp 133,600.00 Rp 36,740.00
Kepala Tukang L.03 OH 0.028 Rp 147,900.00 Rp 4,141.20
Mandor L.17 OH 0.083 Rp 158,000.00 Rp 13,114.00
JUMLAH TENAGA KERJA Rp 221,470.20
B. BAHAN
Semen Portland Kg 276.000 Rp 1,485.00 Rp 409,860.00
Pasir Beton Kg 828.000 Rp 147.21 Rp 121,893.43
Kerikil (Maks 30mm) Kg 1012.000 Rp 191.33 Rp 193,629.33
Air Liter 215.000 Rp - Rp -
JUMLAH HARGA BAHAN Rp 725,382.76
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 946,852.96
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 946,852.96

G.3 Membuat 1 m3 beton mutu F'c=12,2(K150), slump (12+_ 2) cm,w/c =0,72


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.650 Rp 101,500.00 Rp 167,475.00
Tukang Batu L.02 OH 0.275 Rp 133,600.00 Rp 36,740.00
Kepala Tukang L.03 OH 0.028 Rp 147,900.00 Rp 4,141.20
Mandor L.17 OH 0.083 Rp 158,000.00 Rp 13,114.00
JUMLAH TENAGA KERJA Rp 221,470.20
B. BAHAN
Semen Portland Kg 299.000 Rp 1,485.00 Rp 444,015.00
Pasir Beton Kg 799.000 Rp 147.21 Rp 117,624.21
Kerikil (Maks 30mm) Kg 1017.000 Rp 191.33 Rp 194,586.00
Air Liter 215.000 Rp - Rp -
JUMLAH HARGA BAHAN Rp 756,225.21
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 977,695.41
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 977,695.41
G.4 Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K100), Slump (3-6)cm, w/c = 0,87
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.200 Rp 101,500.00 Rp 121,800.00
Tukang Batu L.02 OH 0.200 Rp 133,600.00 Rp 26,720.00
Kepala Tukang L.03 OH 0.020 Rp 147,900.00 Rp 2,958.00
Mandor L.17 OH 0.060 Rp 158,000.00 Rp 9,480.00
JUMLAH TENAGA KERJA Rp 160,958.00
B. BAHAN
Semen Portland Kg 230.000 Rp 1,485.00 Rp 341,550.00
Pasir Beton Kg 893.000 Rp 147.21 Rp 131,462.36
Kerikil (Maks 30mm) Kg 1027.000 Rp 191.33 Rp 196,499.33
Air Liter 200.000 Rp - Rp -
JUMLAH HARGA BAHAN Rp 669,511.69
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 830,469.69
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 830,469.69

G.5 Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K175), Slump (12 ± 2)cm, w/c = 0,66
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.650 Rp 101,500.00 Rp 167,475.00
Tukang Batu L.02 OH 0.275 Rp 133,600.00 Rp 36,740.00
Kepala Tukang L.03 OH 0.028 Rp 147,900.00 Rp 4,141.20
Mandor L.17 OH 0.083 Rp 158,000.00 Rp 13,114.00
JUMLAH TENAGA KERJA Rp 221,470.20
B. BAHAN
Semen Portland Kg 326.000 Rp 1,485.00 Rp 484,110.00
Pasir Beton Kg 760.000 Rp 147.21 Rp 111,882.86
Kerikil (Maks 30mm) Kg 1029.000 Rp 191.33 Rp 196,882.00
Air Liter 215.000 Rp - Rp -
JUMLAH HARGA BAHAN Rp 792,874.86
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 1,014,345.06
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 1,014,345.06
G.6 Membuat 1 m3 beton mutu f'c = 16,9 Mpa (K200), Slump (12 ± 2)cm, w/c = 0,61
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.650 Rp 101,500.00 Rp 167,475.00
Tukang Batu L.02 OH 0.275 Rp 133,600.00 Rp 36,740.00
Kepala Tukang L.03 OH 0.028 Rp 147,900.00 Rp 4,141.20
Mandor L.17 OH 0.083 Rp 158,000.00 Rp 13,114.00
JUMLAH TENAGA KERJA Rp 221,470.20
B. BAHAN
Semen Portland Kg 352.000 Rp 1,485.00 Rp 522,720.00
Pasir Beton Kg 731.000 Rp 147.21 Rp 107,613.64
Kerikil (Maks 30mm) Kg 1031.000 Rp 191.33 Rp 197,264.67
Air Liter 215.000 Rp - Rp -
JUMLAH HARGA BAHAN Rp 827,598.31
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 1,049,068.51
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 1,049,068.51

G.7 Membuat 1 m3 beton mutu f'c=19,3 Mpa(K 225),slump ( 12 ±2) cm, w/c = 0,58
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.650 Rp 101,500.00 Rp 167,475.00
Tukang Batu L.02 OH 0.275 Rp 133,600.00 Rp 36,740.00
Kepala Tukang L.03 OH 0.028 Rp 147,900.00 Rp 4,141.20
Mandor L.17 OH 0.083 Rp 158,000.00 Rp 13,114.00
JUMLAH TENAGA KERJA Rp 221,470.20
B. BAHAN
Semen Portland Kg 371.000 Rp 1,485.00 Rp 550,935.00
Pasir Beton Kg 698.000 Rp 147.21 Rp 102,755.57
Kerikil (Maks 30mm) Kg 1047.000 Rp 191.33 Rp 200,326.00
Air Liter 215.000 Rp - Rp -
JUMLAH HARGA BAHAN Rp 854,016.57
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 1,075,486.77
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 1,075,486.77
G.8 Membuat 1 m3 beton mutu f'c=21,7 Mpa(K 250),slump ( 12 ±2) cm, w/c = 0,56
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.650 Rp 101,500.00 Rp 167,475.00
Tukang Batu L.02 OH 0.275 Rp 133,600.00 Rp 36,740.00
Kepala Tukang L.03 OH 0.028 Rp 147,900.00 Rp 4,141.20
Mandor L.17 OH 0.083 Rp 158,000.00 Rp 13,114.00
JUMLAH TENAGA KERJA Rp 221,470.20
B. BAHAN
Semen Portland Kg 384.000 Rp 1,485.00 Rp 570,240.00
Pasir Beton Kg 692.000 Rp 147.21 Rp 101,872.29
Kerikil (Maks 30mm) Kg 1039.000 Rp 191.33 Rp 198,795.33
Air Liter 215.000 Rp - Rp -
JUMLAH HARGA BAHAN Rp 870,907.62
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 1,092,377.82
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 1,092,377.82

G.9 Membuat 1 m3 beton mutu f'c=24,0 Mpa(K 275),slump ( 12 ±2) cm, w/c = 0,53
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.650 Rp 101,500.00 Rp 167,475.00
Tukang Batu L.02 OH 0.275 Rp 133,600.00 Rp 36,740.00
Kepala Tukang L.03 OH 0.028 Rp 147,900.00 Rp 4,141.20
Mandor L.17 OH 0.083 Rp 158,000.00 Rp 13,114.00
JUMLAH TENAGA KERJA Rp 221,470.20
B. BAHAN
Semen Portland Kg 406.000 Rp 1,485.00 Rp 602,910.00
Pasir Beton Kg 684.000 Rp 147.21 Rp 100,694.57
Kerikil (Maks 30mm) Kg 1026.000 Rp 191.33 Rp 196,308.00
Air Liter 215.000 Rp - Rp -
JUMLAH HARGA BAHAN Rp 899,912.57
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 1,121,382.77
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 1,121,382.77
G.10 Membuat 1 m3 beton mutu f'c=26,4 Mpa(K 300),slump ( 12+_2) cm, w/c = 0,52
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.650 Rp 101,500.00 Rp 167,475.00
Tukang Batu L.02 OH 0.275 Rp 133,600.00 Rp 36,740.00
Kepala Tukang L.03 OH 0.028 Rp 147,900.00 Rp 4,141.20
Mandor L.17 OH 0.083 Rp 158,000.00 Rp 13,114.00
JUMLAH TENAGA KERJA Rp 221,470.20
B. BAHAN
Semen Portland Kg 413.000 Rp 1,485.00 Rp 613,305.00
Pasir Beton Kg 681.000 Rp 147.21 Rp 100,252.93
Kerikil (Maks 30mm) Kg 1021.000 Rp 191.33 Rp 195,351.33
Air Liter 215.000 Rp - Rp -
JUMLAH HARGA BAHAN Rp 908,909.26
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 1,130,379.46
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 1,130,379.46

G.11 Membuat 1 m3 beton mutu f'c=28,8 Mpa(K 325),slump ( 12+_2) cm, w/c = 0,49
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 2.100 Rp 101,500.00 Rp 213,150.00
Tukang Batu L.02 OH 0.350 Rp 133,600.00 Rp 46,760.00
Kepala Tukang L.03 OH 0.035 Rp 147,900.00 Rp 5,176.50
Mandor L.17 OH 0.105 Rp 158,000.00 Rp 16,590.00
JUMLAH TENAGA KERJA Rp 281,676.50
B. BAHAN
Semen Portland Kg 439.000 Rp 1,485.00 Rp 651,915.00
Pasir Beton Kg 670.000 Rp 147.21 Rp 98,633.57
Kerikil (Maks 30mm) Kg 1006.000 Rp 191.33 Rp 192,481.33
Air Liter 215.000 Rp - Rp -
JUMLAH HARGA BAHAN Rp 943,029.90
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 1,224,706.40
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 1,224,706.40
G.12
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 2.100 Rp 101,500.00 Rp 213,150.00
Tukang Batu L.02 OH 0.350 Rp 133,600.00 Rp 46,760.00
Kepala Tukang L.03 OH 0.035 Rp 147,900.00 Rp 5,176.50
Mandor L.17 OH 0.105 Rp 158,000.00 Rp 16,590.00
JUMLAH TENAGA KERJA Rp 281,676.50
B. BAHAN
Semen Portland Kg 448.000 Rp 1,485.00 Rp 665,280.00
Pasir Beton Kg 667.000 Rp 147.21 Rp 98,191.93
Kerikil (Maks 30mm) Kg 1000.000 Rp 191.33 Rp 191,333.33
Air Liter 215.000 Rp - Rp -
JUMLAH HARGA BAHAN Rp 954,805.26
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 1,236,481.76
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 1,236,481.76

G.13 Membuat 1 m3 pek cyklop 1:3:5


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 2.380 Rp 101,500.00 Rp 241,570.00
Tukang Batu L.02 OH 0.300 Rp 133,600.00 Rp 40,080.00
Kepala Tukang L.03 OH 0.030 Rp 147,900.00 Rp 4,437.00
Mandor L.17 OH 0.080 Rp 158,000.00 Rp 12,640.00
JUMLAH TENAGA KERJA Rp 298,727.00
B. BAHAN
Semen Portland Kg 280.000 Rp 1,485.00 Rp 415,800.00
Pasir Beton m3 0.450 Rp 187,300.00 Rp 84,285.00
Kerikil (Maks 30mm) m3 0.670 Rp 208,200.00 Rp 139,494.00
Batu Pasang m3 0.045 Rp 249,700.00 Rp 11,236.50
JUMLAH HARGA BAHAN Rp 650,815.50
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 949,542.50
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 949,542.50
G.14 Pembesian 10 kg dengan besi polos atau besi ulir
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.070 Rp 101,500.00 Rp 7,105.00
Tukang Besi L.08 OH 0.070 Rp 125,000.00 Rp 8,750.00
Kepala Tukang L.09 OH 0.007 Rp 143,600.00 Rp 1,005.20
Mandor L.17 OH 0.004 Rp 158,000.00 Rp 632.00
JUMLAH TENAGA KERJA Rp 17,492.20
B. BAHAN
Besi beton (polos/ulir) kg 10.500 Rp 9,400.00 Rp 98,700.00
Kawat beton kg 0.150 Rp 25,200.00 Rp 3,780.00
JUMLAH HARGA BAHAN Rp 102,480.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 119,972.20
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 119,972.20
Harga Satuan Pekerjaan/ kg Rp 11,997.22

G.15 Pemasangan 1 m2 bekisting trotoar


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.400 Rp 101,500.00 Rp 40,600.00
Tukang Kayu L.04 OH 0.500 Rp 140,800.00 Rp 70,400.00
Kepala Tukang L.05 OH 0.050 Rp 152,300.00 Rp 7,615.00
Mandor L.17 OH 0.010 Rp 158,000.00 Rp 1,580.00
JUMLAH TENAGA KERJA Rp 120,195.00
B. BAHAN
Papan Bekisting m3 0.040 Rp 866,800.00 Rp 34,672.00
Paku 5 - 10 cm kg 0.400 Rp 18,900.00 Rp 7,560.00
JUMLAH HARGA BAHAN Rp 42,232.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 162,427.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 162,427.00
G Harga Satuan Pekerjaan (D+E)/ 2 X PAKAI Rp 81,213.50
G.16 Pemasangan 1 m2 bekisting sloof
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.520 Rp 101,500.00 Rp 52,780.00
Tukang Kayu L.04 OH 0.260 Rp 140,800.00 Rp 36,608.00
Kepala Tukang L.05 OH 0.026 Rp 152,300.00 Rp 3,959.80
Mandor L.17 OH 0.026 Rp 158,000.00 Rp 4,108.00
JUMLAH TENAGA KERJA Rp 97,455.80
B. BAHAN
Kayu Kelas III m3 0.045 Rp 4,032,000.00 Rp 181,440.00
Paku 5 - 10 cm kg 0.300 Rp 18,900.00 Rp 5,670.00
Minyak bekisting/Solar Liter 0.100 Rp 8,100.00 Rp 810.00
JUMLAH HARGA BAHAN Rp 187,920.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 285,375.80
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 285,375.80
G Harga Satuan Pekerjaan (D+E)/ 2 X PAKAI Rp 142,687.90

G.17 Pemasangan 1 m2 bekisting kolom


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.660 Rp 101,500.00 Rp 66,990.00
Tukang Kayu L.04 OH 0.330 Rp 140,800.00 Rp 46,464.00
Kepala Tukang L.05 OH 0.033 Rp 152,300.00 Rp 5,025.90
Mandor L.17 OH 0.033 Rp 158,000.00 Rp 5,214.00
JUMLAH TENAGA KERJA Rp 123,693.90
B. BAHAN
Kayu Kelas III m3 0.040 Rp 4,032,000.00 Rp 161,280.00
Paku 5 - 12 cm kg 0.400 Rp 18,900.00 Rp 7,560.00
Minyak bekisting/Solar Liter 0.200 Rp 8,100.00 Rp 1,620.00
Balok kayu kelas II m3 0.015 Rp 7,682,400.00 Rp 115,236.00
Plywood tebal 9 mm Lbr 0.350 Rp 136,800.00 Rp 47,880.00
dolken kayu, panjang 4m btng 2.000 Rp 115,200.00 Rp 230,400.00
JUMLAH HARGA BAHAN Rp 563,976.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 687,669.90
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 687,669.90
G Harga Satuan Pekerjaan (D+E)/ HARGA 2 X PAKAI Rp 343,834.95
G.18 Pemasangan 1 m2 bekisting balok
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.660 Rp 101,500.00 Rp 66,990.00
Tukang Kayu L.04 OH 0.330 Rp 140,800.00 Rp 46,464.00
Kepala Tukang L.05 OH 0.033 Rp 152,300.00 Rp 5,025.90
Mandor L.17 OH 0.033 Rp 158,000.00 Rp 5,214.00
JUMLAH TENAGA KERJA Rp 123,693.90
B. BAHAN
Kayu kelas III m3 0.040 Rp 4,032,000.00 Rp 161,280.00
Paku 5 - 12 cm kg 0.400 Rp 18,900.00 Rp 7,560.00
Minyak bekisting/Solar Liter 0.200 Rp 8,100.00 Rp 1,620.00
Balok kayu kelas II m3 0.018 Rp 7,682,400.00 Rp 138,283.20
Plywood tebal 9 mm Lbr 0.350 Rp 136,800.00 Rp 47,880.00
dolken kayu, panjang 4m btng 2.000 Rp 115,200.00 Rp 230,400.00
JUMLAH HARGA BAHAN Rp 587,023.20
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 710,717.10
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 710,717.10
G Harga Satuan Pekerjaan (D+E)/ HARGA 2 X PAKAI Rp 355,358.55

G.19 Pemasangan 1 m2 bekisting untuk lantai


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.660 Rp 101,500.00 Rp 66,990.00
Tukang Kayu L.04 OH 0.330 Rp 140,800.00 Rp 46,464.00
Kepala Tukang L.05 OH 0.033 Rp 152,300.00 Rp 5,025.90
Mandor L.17 OH 0.033 Rp 158,000.00 Rp 5,214.00
JUMLAH TENAGA KERJA Rp 123,693.90
B. BAHAN
Kayu kelas III m3 0.040 Rp 4,032,000.00 Rp 161,280.00
Paku 5 - 12 cm kg 0.400 Rp 18,900.00 Rp 7,560.00
Minyak bekisting/Solar Liter 0.200 Rp 8,100.00 Rp 1,620.00
Balok kayu kelas II m3 0.015 Rp 7,682,400.00 Rp 115,236.00
Plywood tebal 9 mm Lbr 0.350 Rp 136,800.00 Rp 47,880.00
dolken kayu, panjang 4m btng 6.000 Rp 115,200.00 Rp 691,200.00
JUMLAH HARGA BAHAN Rp 1,024,776.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 1,148,469.90
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 1,148,469.90
G Harga Satuan Pekerjaan (D+E)/ HARGA 2 X PAKAI Rp 574,234.95
G.20 Pemasangan 1 m2 bekisting untuk tangga
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.660 Rp 101,500.00 Rp 66,990.00
Tukang Kayu L.04 OH 0.330 Rp 140,800.00 Rp 46,464.00
Kepala Tukang L.05 OH 0.033 Rp 152,300.00 Rp 5,025.90
Mandor L.17 OH 0.033 Rp 158,000.00 Rp 5,214.00
JUMLAH TENAGA KERJA Rp 123,693.90
B. BAHAN
Kayu kelas III m3 0.030 Rp 4,032,000.00 Rp 120,960.00
Paku 5 - 12 cm kg 0.400 Rp 18,900.00 Rp 7,560.00
Minyak bekisting/Solar Liter 0.150 Rp 8,100.00 Rp 1,215.00
Balok kayu kelas II m3 0.015 Rp 7,682,400.00 Rp 115,236.00
Plywood tebal 9 mm Lbr 0.350 Rp 136,800.00 Rp 47,880.00
dolken kayu, panjang 4m btng 2.000 Rp 115,200.00 Rp 230,400.00
JUMLAH HARGA BAHAN Rp 523,251.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 646,944.90
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 646,944.90
G Harga Satuan Pekerjaan (D+E)/ HARGA 2 X PAKAI Rp 323,472.45

H SATUAN PEKERJAAN BESI DAN ALUMUNIUM


H.1 Pemasangan 1 kg besi profil
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.060 Rp 101,500.00 Rp 6,090.00
Tukang Las Konstruksi L.26 OH 0.060 Rp 114,200.00 Rp 6,852.00
Kepala Tukang L.27 OH 0.006 Rp 129,800.00 Rp 778.80
Mandor L.17 OH 0.003 Rp 158,000.00 Rp 474.00
JUMLAH TENAGA KERJA Rp 14,194.80
B. BAHAN
Besi Profil kg 1.150 Rp 18,900.00 Rp 21,735.00
JUMLAH HARGA BAHAN Rp 21,735.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 35,929.80
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 35,929.80
H.2 Pemasangan 1 kg rangka kuda-kuda IWF
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.060 Rp 101,500.00 Rp 6,090.00
Tukang Las Konstruksi L.26 OH 0.060 Rp 114,200.00 Rp 6,852.00
Kepala Tukang L.27 OH 0.006 Rp 129,800.00 Rp 778.80
Mandor L.17 OH 0.003 Rp 158,000.00 Rp 474.00
JUMLAH TENAGA KERJA Rp 14,194.80
B. BAHAN
Besi Baja IWF kg 1.150 Rp 18,900.00 Rp 21,735.00
JUMLAH HARGA BAHAN Rp 21,735.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 35,929.80
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 35,929.80

H.3 Pengerjaan 100 kg pekerjaan perakitan


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.100 Rp 101,500.00 Rp 10,150.00
Tukang Las Konstruksi L.26 OH 0.100 Rp 114,200.00 Rp 11,420.00
Kepala Tukang L.27 OH 0.001 Rp 129,800.00 Rp 129.80
Mandor L.17 OH 0.005 Rp 158,000.00 Rp 790.00
JUMLAH TENAGA KERJA Rp 22,489.80
B. BAHAN
Solar ltr 1.000 Rp 8,100.00 Rp 8,100.00
Minyak Pelumas ltr 0.100 Rp 51,300.00 Rp 5,130.00
JUMLAH HARGA BAHAN Rp 13,230.00
C. PERALATAN Rp -

JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 35,719.80
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 35,719.80
Harga per -Kg Rp 357.20
I SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
I.1 Pemasangan 1 m² langit-langit gypsum board ukuran (120 x 240 x 9) dengan rangka kayu kruing
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.500 Rp 101,500.00 Rp 50,750.00
Tukang Kayu L.04 OH 0.200 Rp 140,800.00 Rp 28,160.00
Kepala Tukang L.05 OH 0.020 Rp 152,300.00 Rp 3,046.00
Mandor L.17 OH 0.025 Rp 158,000.00 Rp 3,950.00
JUMLAH TENAGA KERJA Rp 85,906.00
B. BAHAN
Gypsum Lembar 0.380 Rp 79,200.00 Rp 30,096.00
Kayu kruwing balok 8/12 m3 0.015 Rp 8,535,600.00 Rp 128,034.00
Paku lis kg 0.022 Rp 24,300.00 Rp 534.60
JUMLAH HARGA BAHAN Rp 158,664.60

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 244,570.60
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 244,570.60

I.2 Pemasangan 1 m² langit-langit gypsum board ukuran (120 x 240 x 9) mm,(tanpa Rangka)
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.100 Rp 101,500.00 Rp 10,150.00
Tukang Kayu L.04 OH 0.050 Rp 140,800.00 Rp 7,040.00
Kepala Tukang L.05 OH 0.005 Rp 152,300.00 Rp 761.50
Mandor L.17 OH 0.005 Rp 158,000.00 Rp 790.00
JUMLAH TENAGA KERJA Rp 18,741.50
B. BAHAN
Gypsum board Lembar 0.364 Rp 79,200.00 Rp 28,828.80
Paku skrup 1/2" Kg 0.110 Rp 28,800.00 Rp 3,168.00
JUMLAH HARGA BAHAN Rp 31,996.80

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 50,738.30
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 50,738.30
I.3 Pemasangan 1 m' list gypsum
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.030 Rp 101,500.00 Rp 3,045.00
Tukang Kayu L.04 OH 0.030 Rp 140,800.00 Rp 4,224.00
Kepala Tukang L.05 OH 0.003 Rp 152,300.00 Rp 456.90
Mandor L.17 OH 0.003 Rp 158,000.00 Rp 474.00
JUMLAH TENAGA KERJA Rp 8,199.90
B. BAHAN
List gypsum m 1.050 Rp 24,300.00 Rp 25,515.00
Compound/dempul Kg 0.010 Rp 37,800.00 Rp 378.00
JUMLAH HARGA BAHAN Rp 25,893.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 34,092.90
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 34,092.90

I.4 Pemasangan 1 m² langit-langit lambrisering kayu , tebal 9 mm


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.800 Rp 101,500.00 Rp 81,200.00
Tukang Kayu L.04 OH 0.800 Rp 140,800.00 Rp 112,640.00
Kepala Tukang L.05 OH 0.080 Rp 152,300.00 Rp 12,184.00
Mandor L.17 OH 0.040 Rp 158,000.00 Rp 6,320.00
JUMLAH TENAGA KERJA Rp 212,344.00
B. BAHAN
Kayu papan kruwing M³ 0.015 Rp 9,104,400.00 Rp 136,566.00
Paku tripleks Kg 0.010 Rp 18,300.00 Rp 183.00
JUMLAH HARGA BAHAN Rp 136,749.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 349,093.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 349,093.00
I.5 Pemasangan 1 m² langit-langit asbes semen,tebal 4 mm
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.030 Rp 101,500.00 Rp 3,045.00
Tukang Kayu L.04 OH 0.070 Rp 140,800.00 Rp 9,856.00
Kepala Tukang L.05 OH 0.007 Rp 152,300.00 Rp 1,066.10
Mandor L.17 OH 0.004 Rp 158,000.00 Rp 632.00
JUMLAH TENAGA KERJA Rp 14,599.10
B. BAHAN
asbes semen m2 1.100 Rp 18,800.00 Rp 20,680.00
Paku tripleks Kg 0.010 Rp 18,300.00 Rp 183.00
JUMLAH HARGA BAHAN Rp 20,863.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 35,462.10
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 35,462.10

I.6 Pemasangan 1 m² langit-langit tripleks ukuran (120 x 240) cm tebal 6 mm (tanpa rangka)
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.100 Rp 101,500.00 Rp 10,150.00
Tukang Kayu L.04 OH 0.100 Rp 140,800.00 Rp 14,080.00
Kepala Tukang L.05 OH 0.010 Rp 152,300.00 Rp 1,523.00
Mandor L.17 OH 0.005 Rp 158,000.00 Rp 790.00
JUMLAH TENAGA KERJA Rp 26,543.00
B. BAHAN
Tripleks 6 mm lembar 0.375 Rp 93,600.00 Rp 35,100.00
Paku tripleks Kg 0.030 Rp 18,300.00 Rp 549.00
JUMLAH HARGA BAHAN Rp 35,649.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 62,192.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 62,192.00
I.7 1 m' pasangan list langit-langit kayu profil
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.050 Rp 101,500.00 Rp 5,075.00
Tukang Kayu L.04 OH 0.050 Rp 140,800.00 Rp 7,040.00
Kepala Tukang L.05 OH 0.005 Rp 152,300.00 Rp 761.50
Mandor L.17 OH 0.003 Rp 158,000.00 Rp 474.00
JUMLAH TENAGA KERJA Rp 13,350.50
B. BAHAN
list kayu 2/4 m' 1.050 Rp 60,300.00 Rp 63,315.00
Paku list Kg 0.010 Rp 24,300.00 Rp 243.00
JUMLAH HARGA BAHAN Rp 63,558.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 76,908.50
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 76,908.50

I.8 1m2 pekerjaan dinding partisi Playwood rangkap rangka kayu Kruwing
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.200 Rp 101,500.00 Rp 20,300.00
Tukang Kayu L.04 OH 0.600 Rp 140,800.00 Rp 84,480.00
Kepala Tukang L.05 OH 0.060 Rp 152,300.00 Rp 9,138.00
Mandor L.17 OH 0.010 Rp 158,000.00 Rp 1,580.00
JUMLAH TENAGA KERJA Rp 115,498.00
B. BAHAN
Kayu Kelas II/Kruwing m3 0.028 Rp 8,251,200.00 Rp 231,033.60
plywood 6 mm lembar 0.860 Rp 93,600.00 Rp 80,496.00
Paku Usuk kg 0.150 Rp 18,900.00 Rp 2,835.00
lem kayu Kg 0.560 Rp 34,200.00 Rp 19,152.00
JUMLAH HARGA BAHAN Rp 333,516.60

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 449,014.60
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 449,014.60
I.9 1m2 pekerjaan dinding partisi teakwood rangkap rangka kayu kruwing
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.150 Rp 101,500.00 Rp 15,225.00
Tukang Kayu L.04 OH 0.450 Rp 140,800.00 Rp 63,360.00
Kepala Tukang L.05 OH 0.045 Rp 152,300.00 Rp 6,853.50
Mandor L.17 OH 0.080 Rp 158,000.00 Rp 12,640.00
JUMLAH TENAGA KERJA Rp 98,078.50
B. BAHAN
Kayu Kelas II/Kruwing m3 0.028 Rp 8,251,200.00 Rp 231,033.60
teakwood 4 mm lembar 0.860 Rp 183,400.00 Rp 157,724.00
Paku usuk kg 0.150 Rp 18,900.00 Rp 2,835.00
lem kayu Kg 0.560 Rp 34,200.00 Rp 19,152.00
JUMLAH HARGA BAHAN Rp 410,744.60

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 508,823.10
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 508,823.10

I.10 Pemasangan 1 m² rangka besi hollow 1x40.40.2 mm, modul 60x120 cm Untuk Plafond
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.350 Rp 101,500.00 Rp 35,525.00
Tukang Besi L.04 OH 0.350 Rp 125,000.00 Rp 43,750.00
Kepala Tukang L.05 OH 0.035 Rp 143,600.00 Rp 5,026.00
Mandor L.17 OH 0.018 Rp 158,000.00 Rp 2,844.00
JUMLAH TENAGA KERJA Rp 87,145.00
B. BAHAN
Rangka metal hollow 40.40.2 mm m' 4.000 Rp 5,700.00 Rp 22,800.00
Assesories (perkuatan, las dll) Ls 100% x rangka Rp 5,700.00 Rp 5,700.00
JUMLAH HARGA BAHAN Rp 28,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 115,645.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 115,645.00
J PEKERJAAN KAYU
J.1 Pembuatan dan pemasangan 1 M3 Kusen Kamper pintu dan jendela kayu kamper
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 7.000 Rp 101,500.00 Rp 710,500.00
Tukang Kayu L.04 OH 21.000 Rp 140,800.00 Rp 2,956,800.00
Kepala Tukang L.05 OH 2.100 Rp 152,300.00 Rp 319,830.00
Mandor L.17 OH 0.350 Rp 158,000.00 Rp 55,300.00
JUMLAH TENAGA KERJA Rp 4,042,430.00
B. BAHAN
Balok Kayu Kamper M³ 1.100 Rp 10,385,100.00 Rp 11,423,610.00
Paku usuk Kg 1.250 Rp 18,900.00 Rp 23,625.00
Lem kayu Kg 1.000 Rp 34,200.00 Rp 34,200.00
JUMLAH HARGA BAHAN Rp 11,481,435.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 15,523,865.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 15,523,865.00

J.2 Pembuatan dan pemasangan 1 M3 Kusen Kruing pintu dan jendela kayu kruwing
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 6.000 Rp 101,500.00 Rp 609,000.00
Tukang Kayu L.04 OH 18.000 Rp 140,800.00 Rp 2,534,400.00
Kepala Tukang L.05 OH 1.800 Rp 152,300.00 Rp 274,140.00
Mandor L.17 OH 0.300 Rp 158,000.00 Rp 47,400.00
JUMLAH TENAGA KERJA Rp 3,464,940.00
B. BAHAN
Balok Kayu Kruwing M³ 1.200 Rp 8,535,600.00 Rp 10,242,720.00
Paku usuk Kg 1.250 Rp 18,900.00 Rp 23,625.00
Lem kayu Kg 1.000 Rp 34,200.00 Rp 34,200.00
JUMLAH HARGA BAHAN Rp 10,300,545.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 13,765,485.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 13,765,485.00
J.3 Pembuatan dan pemasangan 1 M3 Kusen dan jendela jati
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 7.000 Rp 101,500.00 Rp 710,500.00
Tukang Kayu L.04 OH 21.000 Rp 140,800.00 Rp 2,956,800.00
Kepala Tukang L.05 OH 2.100 Rp 152,300.00 Rp 319,830.00
Mandor L.17 OH 0.350 Rp 158,000.00 Rp 55,300.00
JUMLAH TENAGA KERJA Rp 4,042,430.00
B. BAHAN
kayu jati balok M³ 1.100 Rp 13,941,000.00 Rp 15,335,100.00
Paku usuk Kg 1.250 Rp 18,900.00 Rp 23,625.00
Lem kayu Kg 1.000 Rp 34,200.00 Rp 34,200.00
JUMLAH HARGA BAHAN Rp 15,392,925.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 19,435,355.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 19,435,355.00

J.4 1 m2 Daun Jendela Kaca 3 mm,Kayu kruwing


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.800 Rp 101,500.00 Rp 81,200.00
Tukang Kayu L.04 OH 2.400 Rp 140,800.00 Rp 337,920.00
Kepala Tukang L.05 OH 0.240 Rp 152,300.00 Rp 36,552.00
Mandor L.17 OH 0.040 Rp 158,000.00 Rp 6,320.00
JUMLAH TENAGA KERJA Rp 461,992.00
B. BAHAN
Papan kayu kruing M³ 0.024 Rp 9,104,400.00 Rp 218,505.60
kaca bening 3 mm m2 0.800 Rp 131,000.00 Rp 104,800.00
Lem kayu Kg 0.100 Rp 34,200.00 Rp 3,420.00
JUMLAH HARGA BAHAN Rp 326,725.60

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 788,717.60
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 788,717.60
J.5 Pembuatan dan pemasangan 1 m² pintu dan jendela kaca, kayu kamper
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.800 Rp 101,500.00 Rp 81,200.00
Tukang Kayu L.04 OH 2.400 Rp 140,800.00 Rp 337,920.00
Kepala Tukang L.05 OH 0.240 Rp 152,300.00 Rp 36,552.00
Mandor L.17 OH 0.040 Rp 158,000.00 Rp 6,320.00
JUMLAH TENAGA KERJA Rp 461,992.00
B. BAHAN
Papan kayu kamper M³ 0.024 Rp 11,380,500.00 Rp 273,132.00
Lem kayu Kg 0.300 Rp 34,200.00 Rp 10,260.00
JUMLAH HARGA BAHAN Rp 283,392.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 745,384.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 745,384.00

J.6 Pembuatan dan pemasangan 1 m² pintu panil, kayu kamper


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.000 Rp 101,500.00 Rp 101,500.00
Tukang Kayu L.04 OH 3.000 Rp 140,800.00 Rp 422,400.00
Kepala Tukang L.05 OH 0.300 Rp 152,300.00 Rp 45,690.00
Mandor L.17 OH 0.050 Rp 158,000.00 Rp 7,900.00
JUMLAH TENAGA KERJA Rp 577,490.00
B. BAHAN
Papan kayu kamper M³ 0.040 Rp 11,380,500.00 Rp 455,220.00
Lem kayu Kg 0.500 Rp 34,200.00 Rp 17,100.00
JUMLAH HARGA BAHAN Rp 472,320.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 1,049,810.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 1,049,810.00
J.7 Pemasangan 1 m² kaca tebal 3 mm
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.015 Rp 101,500.00 Rp 1,522.50
Tukang Kayu L.04 OH 0.150 Rp 140,800.00 Rp 21,120.00
Kepala Tukang L.05 OH 0.015 Rp 152,300.00 Rp 2,284.50
Mandor L.17 OH 0.001 Rp 158,000.00 Rp 126.40
JUMLAH TENAGA KERJA Rp 25,053.40
B. BAHAN
Kaca tebal 3 mm bening m2 1.100 Rp 131,000.00 Rp 144,100.00
Sealant Kg 0.050 Rp 147,300.00 Rp 7,365.00
JUMLAH HARGA BAHAN Rp 151,465.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 176,518.40
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 176,518.40

J.8 Pemasangan 1 m² kaca tebal 5 mm


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.015 Rp 101,500.00 Rp 1,522.50
Tukang Kayu L.04 OH 0.150 Rp 140,800.00 Rp 21,120.00
Kepala Tukang L.05 OH 0.015 Rp 152,300.00 Rp 2,284.50
Mandor L.17 OH 0.001 Rp 158,000.00 Rp 126.40
JUMLAH TENAGA KERJA Rp 25,053.40
B. BAHAN
Kaca tebal 5 mm Bening m2 1.100 Rp 129,000.00 Rp 141,900.00
Sealant Kg 0.050 Rp 147,300.00 Rp 7,365.00
JUMLAH HARGA BAHAN Rp 149,265.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 174,318.40
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 174,318.40
J.9 Pembuatan 1 M2 daun pintu plywood rangkap,rangka kayu kamper tertutup ( lembar sampai 90 cm)
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.700 Rp 101,500.00 Rp 71,050.00
Tukang Kayu L.04 OH 2.100 Rp 140,800.00 Rp 295,680.00
Kepala Tukang L.05 OH 0.210 Rp 152,300.00 Rp 31,983.00
Mandor L.17 OH 0.035 Rp 158,000.00 Rp 5,530.00
JUMLAH TENAGA KERJA Rp 404,243.00
B. BAHAN
Papan Kayu Kamper m3 0.025 Rp 11,380,500.00 Rp 284,512.50
Paku 1 - 2,5 cm kg 0.030 Rp 18,300.00 Rp 549.00
Playwood tebal 4 mm lembar 1.000 Rp 183,400.00 Rp 183,400.00
Lem kayu Kg 0.500 Rp 34,200.00 Rp 17,100.00
JUMLAH HARGA BAHAN Rp 485,561.50

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 889,804.50
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 889,804.50

J.10 1 M2 Pek.Daun pintu lapis aluminium


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.250 Rp 101,500.00 Rp 126,875.00
Tukang Kayu L.04 OH 3.000 Rp 140,800.00 Rp 422,400.00
Kepala Tukang L.05 OH 0.300 Rp 152,300.00 Rp 45,690.00
Mandor L.17 OH 0.063 Rp 158,000.00 Rp 9,954.00
JUMLAH TENAGA KERJA Rp 604,919.00
B. BAHAN
Papan Kayu kamper m3 0.015 Rp 11,380,500.00 Rp 170,707.50
Paku 1 cm - 2.5 cm kg 0.100 Rp 18,300.00 Rp 1,830.00
Playwood tebal 4 ml lembar 0.625 Rp 183,400.00 Rp 114,625.00
aluminium Kulit Jeruk lembar 1.000 Rp 108,900.00 Rp 108,900.00
JUMLAH HARGA BAHAN Rp 396,062.50

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 1,000,981.50
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 1,000,981.50
K PEKERJAAN ATAP
K.1 Pemasangan 1 m3 kontruksi kuda-kuda konvensional, Kayu kruwing
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 4.000 Rp 101,500.00 Rp 406,000.00
Tukang Kayu L.04 OH 12.000 Rp 140,800.00 Rp 1,689,600.00
Kepala Tukang L.05 OH 1.200 Rp 152,300.00 Rp 182,760.00
Mandor L.17 OH 0.200 Rp 158,000.00 Rp 31,600.00
JUMLAH TENAGA KERJA Rp 2,309,960.00
B. BAHAN
Balok Kayu Kruwing m3 1.100 Rp 8,535,600.00 Rp 9,389,160.00
Paku 12 cm kg 5.600 Rp 18,300.00 Rp 102,480.00
Besi strip tebal 5 mm kg 15.000 Rp 17,100.00 Rp 256,500.00
JUMLAH HARGA BAHAN Rp 9,748,140.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 12,058,100.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 12,058,100.00

K.2 Pemasangan 1 m2 usuk kayu kruwing dan reng kayu kamper


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.100 Rp 101,500.00 Rp 10,150.00
Tukang Kayu L.04 OH 0.100 Rp 140,800.00 Rp 14,080.00
Kepala Tukang L.05 OH 0.010 Rp 152,300.00 Rp 1,523.00
Mandor L.17 OH 0.005 Rp 158,000.00 Rp 790.00
JUMLAH TENAGA KERJA Rp 26,543.00
B. BAHAN
Usuk Kayu Kruwing m3 0.008 Rp 8,251,200.00 Rp 66,009.60
Usuk reng Kamper 2/3 m3 0.004 Rp 10,053,000.00 Rp 40,212.00
Paku Usuk 5 kg 0.150 Rp 18,900.00 Rp 2,835.00
JUMLAH HARGA BAHAN Rp 109,056.60
C.
PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 135,599.60
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 135,599.60
K.3 Pek. 1 M2 USUK EXPOSE + RENG KAMPER
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.500 Rp 101,500.00 Rp 50,750.00
Tukang Kayu L.04 OH 0.284 Rp 140,800.00 Rp 39,987.20
Kepala Tukang Kayu L.05 OH 0.028 Rp 152,300.00 Rp 4,264.40
Mandor L.17 OH 0.025 Rp 158,000.00 Rp 3,950.00
JUMLAH TENAGA KERJA Rp 48,201.60
B. BAHAN
Kayu Kamper Usuk 5/7 M3 0.012 Rp 10,166,400.00 Rp 121,996.80
Kayu Kamper Reng M3 0.006 Rp 10,053,000.00 Rp 60,318.00
Paku Usuk Kg 0.075 Rp 18,900.00 Rp 1,417.50
JUMLAH HARGA BAHAN Rp 183,732.30

C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 231,933.90
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 231,933.90

K.4 Pek. 1 M2 USUK (KRUING)


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Tukang Kayu L.04 OH 0.057 Rp 140,800.00 Rp 8,025.60
Kepala Tukang Kayu L.05 OH 0.003 Rp 152,300.00 Rp 456.90
Pekerja L.01 OH 0.057 Rp 101,500.00 Rp 5,785.50
Mandor L.17 OH 0.006 Rp 158,000.00 Rp 948.00
JUMLAH TENAGA KERJA Rp 15,216.00
B. BAHAN
Kayu Kruing Usuk 5/7 M3 0.011 Rp 8,251,200.00 Rp 90,763.20
Paku Usuk Kg 0.100 Rp 18,900.00 Rp 1,890.00
JUMLAH HARGA BAHAN Rp 92,653.20

C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 107,869.20
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 107,869.20
K.5 Pek. 1 M2 RENG (KAMPER)
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Tukang Kayu L.04 OH 0.043 Rp 140,800.00 Rp 6,054.40
Kepala Tukang Kayu L.05 OH 0.004 Rp 152,300.00 Rp 609.20
Pekerja L.01 OH 0.043 Rp 101,500.00 Rp 4,364.50
Mandor L.17 OH 0.002 Rp 158,000.00 Rp 316.00
JUMLAH TENAGA KERJA Rp 11,344.10
B. BAHAN
Kayu kamper 5/7 M3 0.008 Rp 10,166,400.00 Rp 81,331.20
Paku Usuk Kg 0.150 Rp 18,900.00 Rp 2,835.00
JUMLAH HARGA BAHAN Rp 84,166.20

C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 95,510.30
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 95,510.30

K.6 1 M1 PEK. KAP BAJA RINGAN PROFIL C BENTANG < 9 M'


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Upah Pasang Accecoris Ls 1.000 Rp 31,100.00 Rp 31,100.00
JUMLAH TENAGA KERJA Rp 31,100.00
B. BAHAN
C. 75. 0.83 m1 1.120 Rp 15,600.00 Rp 17,472.00
C. 75 0,55 m1 2.210 Rp 13,500.00 Rp 29,835.00
GD.B. 0,43 m1 6.600 Rp 15,600.00 Rp 102,960.00
PLAT- PALAT PENYAMBUNG m2 1.000 Rp 20,800.00 Rp 20,800.00
JUMLAH HARGA BAHAN Rp 171,067.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 202,167.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 202,167.00
K.7 1 M1 PEK. KAP BAJA RINGAN PROFIL U BENTANG < 9 M'
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Upah Pasang Accecoris Ls 1.000 Rp 31,100.00 Rp 31,100.00
JUMLAH TENAGA KERJA Rp 31,100.00
B. BAHAN
UK. 75. 0.83 m1 1.120 Rp 20,800.00 Rp 23,296.00
UK. 75 0,55 m1 2.210 Rp 18,700.00 Rp 41,327.00
GD.B. 0,43 m1 6.600 Rp 20,800.00 Rp 137,280.00
PLAT- PALAT PENYAMBUNG m2 1.000 Rp 20,800.00 Rp 20,800.00
JUMLAH HARGA BAHAN Rp 222,703.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 253,803.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 253,803.00

K.8
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.100 Rp 101,500.00 Rp 10,150.00
Tukang Kayu L.04 OH 0.200 Rp 140,800.00 Rp 28,160.00
Kepala Tukang L.05 OH 0.020 Rp 152,300.00 Rp 3,046.00
Mandor L.17 OH 0.005 Rp 158,000.00 Rp 790.00
JUMLAH TENAGA KERJA Rp 42,146.00
B. BAHAN
Papan kayu Kamper 3/20 M³ 0.011 Rp 11,380,500.00 Rp 122,909.40
Paku usuk Kg 0.100 Rp 18,900.00 Rp 1,890.00
JUMLAH HARGA BAHAN Rp 124,799.40

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 166,945.40
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 166,945.40
K.9 Pemasangan 1 m2 atap Goodyear
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.150 Rp 101,500.00 Rp 15,225.00
Tukang Kayu L.04 OH 0.075 Rp 140,800.00 Rp 10,560.00
Kepala Tukang L.05 OH 0.008 Rp 152,300.00 Rp 1,218.40
Mandor L.17 OH 0.008 Rp 158,000.00 Rp 1,264.00
JUMLAH TENAGA KERJA Rp 28,267.40
B. BAHAN
Genteng Goodyear bh 25.000 Rp 4,600.00 Rp 115,000.00
JUMLAH HARGA BAHAN Rp 115,000.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 143,267.40
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 143,267.40

K.10 Pemasangan 1 m' bubung goodyear


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.400 Rp 101,500.00 Rp 40,600.00
Tukang Kayu L.04 OH 0.200 Rp 140,800.00 Rp 28,160.00
Kepala Tukang L.05 OH 0.020 Rp 152,300.00 Rp 3,046.00
Mandor L.17 OH 0.002 Rp 158,000.00 Rp 316.00
JUMLAH TENAGA KERJA Rp 72,122.00
B. BAHAN
Genteng bubung Bh 5.000 Rp 29,700.00 Rp 148,500.00
Semen Portland Kg 8.000 Rp 1,485.00 Rp 11,880.00
Pasir Pasang M³ 0.032 Rp 207,900.00 Rp 6,652.80
JUMLAH HARGA BAHAN Rp 167,032.80

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 239,154.80
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 239,154.80
K.11 Pemasangan 1 m2 Genteng Kodok
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.150 Rp 101,500.00 Rp 15,225.00
Tukang Kayu L.04 OH 0.075 Rp 140,800.00 Rp 10,560.00
Kepala Tukang L.05 OH 0.008 Rp 152,300.00 Rp 1,218.40
Mandor L.17 OH 0.008 Rp 158,000.00 Rp 1,264.00
JUMLAH TENAGA KERJA Rp 28,267.40
B. BAHAN
Genteng kodok bh 25.000 Rp 3,600.00 Rp 90,000.00
JUMLAH HARGA BAHAN Rp 90,000.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 118,267.40
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 118,267.40

K.12 Pemasangan 1 m' bubung genteng kodok


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.400 Rp 101,500.00 Rp 40,600.00
Tukang Kayu L.04 OH 0.200 Rp 140,800.00 Rp 28,160.00
Kepala Tukang L.05 OH 0.020 Rp 152,300.00 Rp 3,046.00
Mandor L.17 OH 0.002 Rp 158,000.00 Rp 316.00
JUMLAH TENAGA KERJA Rp 72,122.00
B. BAHAN
Genteng bubung Bh 5.000 Rp 11,700.00 Rp 58,500.00
Semen Portland Kg 8.000 Rp 1,485.00 Rp 11,880.00
Pasir Pasang M³ 0.032 Rp 207,900.00 Rp 6,652.80
JUMLAH HARGA BAHAN Rp 77,032.80

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 149,154.80
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 149,154.80
K.13 Pek. 10 M' SENG TALANG
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Tukang Kayu L.04 OH 8.000 Rp 140,800.00 Rp 1,126,400.00
Kepala Tukang Kayu L.05 OH 0.800 Rp 152,300.00 Rp 121,840.00
Pekerja L.01 OH 5.000 Rp 101,500.00 Rp 507,500.00
Mandor L.17 OH 0.500 Rp 158,000.00 Rp 79,000.00
JUMLAH TENAGA KERJA Rp 1,834,740.00
B. BAHAN
Seng Talang 30 cm m1 5.500 Rp 15,300.00 Rp 84,150.00
JUMLAH HARGA BAHAN Rp 84,150.00

C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 1,918,890.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 1,918,890.00
1 M' Rp 191,889.00

K.14 1 M2 PASANG SENG GELOMBANG


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Tukang Kayu L.04 OH 0.060 Rp 140,800.00 Rp 8,448.00
Kepala Tukang Kayu L.05 OH 0.006 Rp 152,300.00 Rp 913.80
Pekerja L.01 OH 0.120 Rp 101,500.00 Rp 12,180.00
Mandor L.17 OH 0.006 Rp 158,000.00 Rp 948.00
JUMLAH TENAGA KERJA Rp 22,489.80
B. BAHAN
BJLS 0,18 mm lbr 0.700 Rp 48,600.00 Rp 34,020.00
Paku seng kg 0.020 Rp 23,400.00 Rp 468.00
JUMLAH HARGA BAHAN Rp 34,488.00

C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 56,977.80
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 56,977.80
K.15 Pek. 10 M' BUBUNGAN ATAP SENG
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Tukang Besi L.08 OH 0.250 Rp 140,800.00 Rp 35,200.00
Kepala Tukang L.09 OH 0.025 Rp 152,300.00 Rp 3,807.50
Pekerja L.01 OH 0.250 Rp 101,500.00 Rp 25,375.00
Mandor L.17 OH 0.002 Rp 158,000.00 Rp 316.00
JUMLAH TENAGA KERJA Rp 64,698.50
B. BAHAN
Seng Talang 30 cm m' 6.000 Rp 15,300.00 Rp 91,800.00
Paku sekrup 1/2" kotak 12.000 Rp 28,800.00 Rp 345,600.00
JUMLAH HARGA BAHAN Rp 437,400.00

C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 502,098.50
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 502,098.50
1 M' Rp 50,209.85

K.16 Pek. 1 m2 PASANGAN ATAP SENG LAMA


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Tukang Kayu L.04 OH 0.200 Rp 122,100.00 Rp 24,420.00
Kepala Tukang Kayu L.05 OH 0.020 Rp 132,400.00 Rp 2,648.00
Pekerja L.01 OH 0.100 Rp 77,900.00 Rp 7,790.00
Mandor L.17 OH 0.005 Rp 140,200.00 Rp 701.00
JUMLAH TENAGA KERJA Rp 35,559.00
B. BAHAN
Paku seng kg 0.040 Rp 23,400.00 Rp 936.00
JUMLAH HARGA BAHAN Rp 936.00

C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 36,495.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 36,495.00
L PEKERJAAN PENGECATAN
L.1 Pengecatan 1 M² tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup setara vinilex)
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.020 Rp 101,500.00 Rp 2,030.00
Tukang cat L.06 OH 0.063 Rp 112,000.00 Rp 7,056.00
Kepala tukang L.07 OH 0.006 Rp 123,500.00 Rp 778.05
Mandor L.17 OH 0.003 Rp 158,000.00 Rp 474.00
JUMLAH TENAGA KERJA Rp 10,338.05
B. BAHAN
Plamuur Kg 0.100 Rp 26,100.00 Rp 2,610.00
Cat dasar Kg 0.100 Rp 38,700.00 Rp 3,870.00
Cat penutup setara vinilex Kg 0.260 Rp 77,400.00 Rp 20,124.00
JUMLAH HARGA BAHAN Rp 26,604.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 36,942.05
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 36,942.05

L.2 Pengecatan 1 M² tembok lama (1 x cat dasar, 2 x cat penutup)


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.028 Rp 101,500.00 Rp 2,842.00
Tukang cat L.06 OH 0.042 Rp 112,000.00 Rp 4,704.00
Kepala tukang L.07 OH 0.004 Rp 123,500.00 Rp 518.70
Mandor L.17 OH 0.003 Rp 158,000.00 Rp 474.00
JUMLAH TENAGA KERJA Rp 8,538.70
B. BAHAN
Cat dasar Kg 0.120 Rp 38,700.00 Rp 4,644.00
Cat penutup setara vinilex Kg 0.180 Rp 77,400.00 Rp 13,932.00
JUMLAH HARGA BAHAN Rp 18,576.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 27,114.70
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 27,114.70
L.3 Pelaburan 1 m2 bidang kayu dengan politur
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.040 Rp 101,500.00 Rp 4,060.00
Tukang Cat L.06 OH 0.060 Rp 112,000.00 Rp 6,720.00
Kepala Tukang L.07 OH 0.016 Rp 123,500.00 Rp 1,976.00
Mandor L.17 OH 0.003 Rp 158,000.00 Rp 474.00
JUMLAH TENAGA KERJA Rp 13,230.00
B. BAHAN
politur L 0.150 Rp 57,000.00 Rp 8,550.00
politur jadi L 0.372 Rp 85,500.00 Rp 31,806.00
ampelas Lbr 2.000 Rp 6,300.00 Rp 12,600.00
JUMLAH HARGA BAHAN Rp 52,956.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 66,186.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 66,186.00

L.4 1 m2 pekerjaan cat meni


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.050 Rp 101,500.00 Rp 5,075.00
Tukang cat L.06 OH 0.075 Rp 112,000.00 Rp 8,400.00
Kepala tukang L.07 OH 0.015 Rp 123,500.00 Rp 1,852.50
Mandor L.17 OH 0.005 Rp 158,000.00 Rp 790.00
JUMLAH TENAGA KERJA Rp 16,117.50
B. BAHAN
Meni Kayu Ltr 0.120 Rp 37,800.00 Rp 4,536.00
minyak cat Ltr 0.050 Rp 26,100.00 Rp 1,305.00
JUMLAH HARGA BAHAN Rp 5,841.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 21,958.50
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 21,958.50
L.5 1 M2 Pek.Bidang kayu baru (1 plamir, 1 lapis cat dasar, 2 lapis cat penutup)
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.070 Rp 101,500.00 Rp 7,105.00
Tukang cat L.06 OH 0.009 Rp 112,000.00 Rp 1,008.00
Kepala tukang L.07 OH 0.006 Rp 123,500.00 Rp 741.00
Mandor L.17 OH 0.003 Rp 158,000.00 Rp 474.00
JUMLAH TENAGA KERJA Rp 9,328.00
B. BAHAN
Cat Menie kg 0.200 Rp 37,800.00 Rp 7,560.00
Plamuur kg 0.150 Rp 34,200.00 Rp 5,130.00
Cat Dasar kg 0.170 Rp 43,200.00 Rp 7,344.00
Cat Penutup kg 0.260 Rp 70,200.00 Rp 18,252.00
Minyak cat kg 0.030 Rp 26,100.00 Rp 783.00
Amplas lbr 0.200 Rp 6,300.00 Rp 1,260.00
Kuas bh 0.010 Rp 15,000.00
JUMLAH HARGA BAHAN Rp 40,329.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 49,657.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 49,657.00

L.6 Pekerjaan 1 M² cat kayu ulang


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.100 Rp 101,500.00 Rp 10,150.00
Tukang cat L.06 OH 0.150 Rp 112,000.00 Rp 16,800.00
Kepala tukang L.07 OH 0.015 Rp 123,500.00 Rp 1,852.50
Mandor L.17 OH 0.005 Rp 158,000.00 Rp 790.00
JUMLAH TENAGA KERJA Rp 29,592.50
B. BAHAN
Cat Kayu Kg 0.189 Rp 70,200.00 Rp 13,267.80
JUMLAH HARGA BAHAN Rp 13,267.80
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 42,860.30
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 42,860.30
L.7 1 m2 Pengecatan Kanstin
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.150 Rp 101,500.00 Rp 15,225.00
Tukang cat L.06 OH 0.030 Rp 112,000.00 Rp 3,360.00
Kepala tukang L.07 OH 0.003 Rp 123,500.00 Rp 370.50
Mandor L.17 OH 0.003 Rp 158,000.00 Rp 474.00
JUMLAH TENAGA KERJA Rp 19,429.50
B. BAHAN
cat kayu kg 0.284 Rp 70,200.00 Rp 19,936.80
Minyak Cat kg 0.071 Rp 26,100.00 Rp 1,853.10
JUMLAH HARGA BAHAN Rp 21,789.90
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 41,219.40
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 41,219.40

L.8 Pekerjaan 1 m² waterproofing


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Ongkos Kerja L.01 Ls 1.000 Rp 59,800.00 Rp 59,800.00
JUMLAH TENAGA KERJA Rp 59,800.00
B. BAHAN
Waterproofing Ltr 1.000 Rp 10,300.00 Rp 10,300.00
JUMLAH HARGA BAHAN Rp 10,300.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 70,100.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 70,100.00
M PEKERJAAN PENGASPALAN
M.1 Biaya Menggilas Perbulan
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Masinis L.13 OH 30.000 Rp 162,200.00 Rp 4,866,000.00
Kernet L.14 OH 30.000 Rp 151,800.00 Rp 4,554,000.00
JUMLAH TENAGA KERJA Rp 9,420,000.00
B. BAHAN
Oli Ltr 30.000 Rp 45,900.00 Rp 1,377,000.00
Solar Ltr 600.000 Rp 7,100.00 Rp 4,260,000.00
Sewa Wales hari 30.000 Rp 176,500.00 Rp 5,295,000.00
JUMLAH HARGA BAHAN Rp 10,932,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 20,352,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 20,352,000.00

M.2 1 M2 menyiapkan Sub Grade


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.000 Rp 77,900.00 Rp 23.37
Mandor L.17 OH 0.000 Rp 140,200.00 Rp 28.04
JUMLAH TENAGA KERJA Rp 51.41
B. BAHAN
Biaya Menggilas Perbulan Ls 0.000 Rp 20,352,000.00 Rp 4,070.40
JUMLAH HARGA BAHAN Rp 4,070.40
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 4,121.81
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 4,121.81
M.3 1 M3 Timbunan Sirtu
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.250 Rp 77,900.00 Rp 19,475.00
Mandor L.17 OH 0.025 Rp 140,200.00 Rp 3,505.00
JUMLAH TENAGA KERJA Rp 22,980.00
B. BAHAN
Pasir Batu ( Sirtu) m3 1.200 Rp 186,200.00 Rp 223,440.00
Biaya Menggilas Perbulan Ls 0.001 Rp 20,352,000.00 Rp 20,352.00
JUMLAH HARGA BAHAN Rp 243,792.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 266,772.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 266,772.00

M.4 1 m2 Pasangan Gladak ( Batu Pecah 10/15)


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.469 Rp 77,900.00 Rp 36,535.10
Mandor L.17 OH 0.023 Rp 140,200.00 Rp 3,224.60
JUMLAH TENAGA KERJA Rp 39,759.70
B. BAHAN
Batu Pecah 10/15 m3 0.165 Rp 249,700.00 Rp 41,200.50
Biaya Menggilas Perbulan Ls 0.000 Rp 20,352,000.00 Rp 6,105.60
JUMLAH HARGA BAHAN Rp 47,306.10
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 87,065.80
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 87,065.80

M.5 1 M' Pas Batu Kancing 15/20


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
JUMLAH TENAGA KERJA
B. BAHAN
Batu Pasang m3 0.038 Rp 249,700.00 Rp 9,488.60
Galian Tanah m3 0.026 Rp 80,075.00 Rp 2,081.95
Buangan Tanah m3 0.010 Rp 35,075.00 Rp 350.75
JUMLAH HARGA BAHAN Rp 11,921.30
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 11,921.30
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 11,921.30
M.6 100 M2 Dihampar Batu Pecah 5/7 cm diatas LPB Gladak Batu Pecah
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 5.250 Rp 77,900.00 Rp 408,975.00
Mandor L.17 OH 0.263 Rp 140,200.00 Rp 36,872.60
JUMLAH TENAGA KERJA Rp 445,847.60
B. BAHAN
Batu Pecah 5/7 m3 7.000 Rp 272,200.00 Rp 1,905,400.00
Biaya Menggilas Perbulan Ls 0.027 Rp 20,352,000.00 Rp 549,504.00
JUMLAH HARGA BAHAN Rp 2,454,904.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 2,900,751.60
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 2,900,751.60
Harga M2 Rp 29,007.52

M.7 100 M2 Dihampar Lapen Batu Pecah 2/3 cm + 3/4 cm + Aspal


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 7.000 Rp 77,900.00 Rp 545,300.00
Tukang masak aspal L.16 OH 0.150 Rp 101,500.00 Rp 15,225.00
Mandor L.17 OH 0.350 Rp 140,200.00 Rp 49,070.00

JUMLAH TENAGA KERJA Rp 609,595.00


B. BAHAN
Batu Pecah 3 - 5 cm M3 4.000 Rp 279,300.00 Rp 1,117,200.00
BATU pecah 2 - 3cm M3 3.000 Rp 279,300.00 Rp 837,900.00
Aspal kg 75.000 Rp 11,400.00 Rp 855,000.00
Solar ltr 5.383 Rp 7,100.00 Rp 38,219.30
Biaya Menggilas Perbulan Ls 0.027 Rp 20,352,000.00 Rp 549,504.00
JUMLAH HARGA BAHAN Rp 3,397,823.30
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 4,007,418.30
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 4,007,418.30
Harga M2 Rp 40,074.18
M.8 100 M2 Mengaspal Dengan Aspal 200 Kg
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 9.000 Rp 77,900.00 Rp 701,100.00
Tukang masak aspal L.16 OH 0.400 Rp 101,500.00 Rp 40,600.00
Mandor L.17 OH 0.450 Rp 140,200.00 Rp 63,090.00

JUMLAH TENAGA KERJA Rp 804,790.00


B. BAHAN
Aspal kg 200.000 Rp 11,400.00 Rp 2,280,000.00
Batu Seplit ( 0,5 -1 ) cm/Penutup M3 1.200 Rp 306,400.00 Rp 367,680.00
Solar Ltr 14.354 Rp 7,100.00 Rp 101,913.40
Biaya Menggilas Perbulan Ls 0.013 Rp 20,352,000.00 Rp 264,576.00
JUMLAH HARGA BAHAN Rp 3,014,169.40
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 3,818,959.40
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 3,818,959.40
Harga M2 Rp 38,189.59

M.9 100 M2 Mengaspal Dengan Aspal 125 Kg


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 7.500 Rp 77,900.00 Rp 584,250.00
TukangMasak Aspal L.16 OH 0.250 Rp 101,500.00 Rp 25,375.00
Mandor L.17 OH 0.375 Rp 140,200.00 Rp 52,575.00
Rp -
JUMLAH TENAGA KERJA Rp 662,200.00
B. BAHAN
Aspal kg 125.000 Rp 11,400.00 Rp 1,425,000.00
Batu Seplit Jagung 1-2 cm/Penutup M3 1.200 Rp 300,800.00 Rp 360,960.00
Solar Ltr 8.971 Rp 7,100.00 Rp 63,694.10
Biaya Menggilas Perbulan Ls 0.013 Rp 20,352,000.00 Rp 264,576.00
JUMLAH HARGA BAHAN Rp 2,114,230.10
C. PERALATAN
Sikat Ijuk bh 0.400 Rp 23,000.00 Rp 9,200.00
Sikat Baja bh 0.040 Rp 20,400.00 Rp 816.00
JUMLAH HARGA ALAT Rp 10,016.00

D. Jumlah (A + B + C) Rp 2,786,446.10
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 2,786,446.10
Harga M2 Rp 27,864.46
M.10 100 M2 Dihampar Lapen Batu Pecah 2/3 + 3/4 + Aspal
\ URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 7.500 Rp 77,900.00 Rp 584,250.00
TukangMasak Aspal L.16 OH 0.250 Rp 101,500.00 Rp 25,375.00
Mandor L.17 OH 0.375 Rp 140,200.00 Rp 52,575.00

JUMLAH TENAGA KERJA Rp 662,200.00


B. BAHAN
Aspal kg 125.000 Rp 11,400.00 Rp 1,425,000.00
Batu Seplit Jagung 2-3 cm/Penutup M3 3.000 Rp 279,300.00 Rp 837,900.00
Batu Seplit Jagung 1-2 cm/Penutup M3 1.200 Rp 300,800.00 Rp 360,960.00
Solar Ltr 8.971 Rp 7,100.00 Rp 63,694.10
Biaya Menggilas Perbulan Ls 0.013 Rp 20,352,000.00 Rp 264,576.00
JUMLAH HARGA BAHAN Rp 2,952,130.10
C. PERALATAN
Sikat Ijuk bh 0.400 Rp 23,000.00 Rp 9,200.00
Sikat Baja bh 0.040 Rp 20,400.00 Rp 816.00
JUMLAH HARGA ALAT Rp 10,016.00

D. Jumlah (A + B + C) Rp 3,624,346.10
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 3,624,346.10
Harga M2 Rp 36,243.46

M.11 100 M2 Mengaspal Dengan Aspal 175 Kg


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 9.000 Rp 77,900.00 Rp 701,100.00
Tukang Masak Aspal L.16 OH 0.400 Rp 101,500.00 Rp 40,600.00
Mandor L.17 OH 0.450 Rp 140,200.00 Rp 63,090.00

JUMLAH TENAGA KERJA Rp 804,790.00


B. BAHAN
Aspal kg 175.000 Rp 11,400.00 Rp 1,995,000.00
Batu Seplit Jagung 1-2 cm / Penutup M3 1.200 Rp 300,800.00 Rp 360,960.00
Solar ltr 12.560 Rp 7,100.00 Rp 89,176.00
Biaya Menggilas Perbulan Ls 0.013 Rp 20,352,000.00 Rp 264,576.00
JUMLAH HARGA BAHAN Rp 2,709,712.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 3,514,502.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 3,514,502.00
Harga M2 Rp 35,145.02
M.12 100 M2 Mengaspal Dengan Aspal 100 Kg
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 6.000 Rp 77,900.00 Rp 467,400.00
TukangMasak Aspal L.16 OH 0.250 Rp 101,500.00 Rp 25,375.00
Mandor L.17 OH 0.350 Rp 140,200.00 Rp 49,070.00

JUMLAH TENAGA KERJA Rp 541,845.00


B. BAHAN
Aspal kg 100.000 Rp 11,400.00 Rp 1,140,000.00
Batu Seplit Jagung 1-2 cm / kasar M3 1.200 Rp 300,800.00 Rp 360,960.00
Solar ltr 7.177 Rp 7,100.00 Rp 50,956.70
Biaya Menggilas Perbulan Ls 0.013 Rp 20,352,000.00 Rp 264,576.00
JUMLAH HARGA BAHAN Rp 1,816,492.70
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 2,358,337.70
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 2,358,337.70
Harga M2 Rp 23,583.38

M.13 100 M2 Mengaspal Dengan Aspal 100 kg


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 6.000 Rp 77,900.00 Rp 467,400.00
TukangMasak Aspal L.16 OH 0.250 Rp 101,500.00 Rp 25,375.00
Mandor L.17 OH 0.350 Rp 140,200.00 Rp 49,070.00
Rp -
JUMLAH TENAGA KERJA Rp 541,845.00
B. BAHAN
Aspal kg 100.000 Rp 11,400.00 Rp 1,140,000.00
Batu Seplit Jagung 1-2 cm / Penutup M3 1.200 Rp 300,800.00 Rp 360,960.00
Solar ltr 7.177 Rp 7,100.00 Rp 50,956.70
Biaya Menggilas Perbulan Ls 0.012 Rp 20,352,000.00 Rp 244,224.00
JUMLAH HARGA BAHAN Rp 1,796,140.70
C. PERALATAN
Sikat Ijuk bh 0.300 Rp 23,000.00 Rp 6,900.00
Sikat Baja bh 0.030 Rp 20,400.00 Rp 612.00
JUMLAH HARGA ALAT Rp 7,512.00

D. Jumlah (A + B + C) Rp 2,345,497.70
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 2,345,497.70
Harga M2 Rp 23,454.98
M.14 100 M2 Mengaspal Dengan Aspal 120,8 Kg
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 2.000 Rp 77,900.00 Rp 155,800.00
TukangMasak Aspal L.16 OH 2.000 Rp 101,500.00 Rp 203,000.00
Mandor L.17 OH 1.000 Rp 140,200.00 Rp 140,200.00

JUMLAH TENAGA KERJA Rp 499,000.00


B. BAHAN
Aspal kg 120.800 Rp 11,400.00 Rp 1,377,120.00
Batu Seplit ( 0,5 -1 ) cm/Penutup M3 1.200 Rp 306,400.00 Rp 367,680.00
Solar ltr 8.670 Rp 7,100.00 Rp 61,557.00
Biaya Menggilas Perbulan Ls 0.013 Rp 20,352,000.00 Rp 264,576.00
JUMLAH HARGA BAHAN Rp 2,070,933.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 2,569,933.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 2,569,933.00
Harga M2 Rp 25,699.33

M HARGA SATUAN PEKERJAAN SANITASI


M.1 Memasang 1 Buah Kloset Duduk
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 3.300 Rp 101,500.00 Rp 334,950.00
Tukang Batu L.02 OH 1.100 Rp 133,600.00 Rp 146,960.00
Kepala Tukang L.03 OH 0.010 Rp 147,900.00 Rp 1,479.00
Mandor L.17 OH 0.160 Rp 158,000.00 Rp 25,280.00
JUMLAH TENAGA KERJA Rp 508,669.00
B. BAHAN
Kloset duduk Bh 1.000 Rp 1,729,800.00 Rp 1,729,800.00
Perlengkapan Ls 0.060 Rp 1,729,800.00 Rp 103,788.00
JUMLAH HARGA BAHAN Rp 1,833,588.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 2,342,257.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 2,342,257.00
M.2 Memasang 1 Buah Kloset Jongkok Porselin
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.000 Rp 101,500.00 Rp 101,500.00
Tukang Batu L.02 OH 1.500 Rp 133,600.00 Rp 200,400.00
Kepala Tukang L.03 OH 0.150 Rp 147,900.00 Rp 22,185.00
Mandor L.17 OH 0.160 Rp 158,000.00 Rp 25,280.00
JUMLAH TENAGA KERJA Rp 349,365.00
B. BAHAN
Kloset jongkok porselen Bh 1.000 Rp 270,900.00 Rp 270,900.00
Semen Portland Kg 6.000 Rp 1,485.00 Rp 8,910.00
Pasir Pasang m3 0.010 Rp 207,900.00 Rp 2,079.00
JUMLAH HARGA BAHAN Rp 281,889.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 631,254.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 631,254.00

M.3 Memasang 1 Buah Urinoir


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.000 Rp 101,500.00 Rp 101,500.00
Tukang Batu L.02 OH 1.000 Rp 133,600.00 Rp 133,600.00
Kepala Tukang L.03 OH 0.100 Rp 147,900.00 Rp 14,790.00
Mandor L.17 OH 0.050 Rp 158,000.00 Rp 7,900.00
JUMLAH TENAGA KERJA Rp 257,790.00
B. BAHAN
Urinoir Bh 1.000 Rp 2,049,300.00 Rp 2,049,300.00
Semen Portland Kg 6.000 Rp 1,485.00 Rp 8,910.00
Pasir Pasang m3 0.010 Rp 207,900.00 Rp 2,079.00
Perlengkapan % 0.300 Rp 2,049,300.00 Rp 614,790.00
JUMLAH HARGA BAHAN Rp 2,675,079.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 2,932,869.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 2,932,869.00
M.4 Memasang 1 Buah Wastafel
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.200 Rp 101,500.00 Rp 121,800.00
Tukang Batu L.02 OH 1.450 Rp 133,600.00 Rp 193,720.00
Kepala Tukang L.03 OH 0.150 Rp 147,900.00 Rp 22,185.00
Mandor L.17 OH 0.060 Rp 158,000.00 Rp 9,480.00
JUMLAH TENAGA KERJA Rp 347,185.00
B. BAHAN
Wastafel Bh 1.000 Rp 939,600.00 Rp 939,600.00
Semen Portland Kg 6.000 Rp 1,485.00 Rp 8,910.00
Pasir Pasang m3 0.010 Rp 207,900.00 Rp 2,079.00
Perlengkapan % 0.120 Rp 939,600.00 Rp 112,752.00
JUMLAH HARGA BAHAN Rp 1,063,341.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 1,410,526.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 1,410,526.00

M.5 Memasang 1 Bh Floor Drain


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.010 Rp 101,500.00 Rp 1,015.00
Tukang Batu L.02 OH 0.100 Rp 133,600.00 Rp 13,360.00
Kepala Tukang L.03 OH 0.010 Rp 147,900.00 Rp 1,479.00
Mandor L.17 OH 0.005 Rp 158,000.00 Rp 790.00
JUMLAH TENAGA KERJA Rp 16,644.00
B. BAHAN
Floor Drain Bh 1.000 Rp 85,500.00 Rp 85,500.00
JUMLAH HARGA BAHAN Rp 85,500.00
C. PERALATAN
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 102,144.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 102,144.00
M.6 1 M' PAS. PIPA PVC TIPE AW 0.5"
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.036 Rp 101,500.00 Rp 3,654.00
Tukang Batu L.02 OH 0.060 Rp 133,600.00 Rp 8,016.00
Kepala Tukang L.03 OH 0.006 Rp 147,900.00 Rp 887.40
Mandor L.17 OH 0.002 Rp 158,000.00 Rp 316.00
JUMLAH TENAGA KERJA Rp 12,873.40
B. BAHAN
Pipa PVC m' 1.200 Rp 7,650.00 Rp 9,180.00
JUMLAH HARGA BAHAN Rp 9,180.00

C. PERALATAN 35% Harga Pipa Rp 7,650.00 Rp 2,677.50


JUMLAH HARGA ALAT Rp 2,677.50

D. Jumlah (A + B + C) Rp 24,730.90
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 24,730.90

M.7 1 M' PAS. PIPA PVC TIPE AW 3/4"


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.036 Rp 101,500.00 Rp 3,654.00
Tukang Batu L.02 OH 0.060 Rp 133,600.00 Rp 8,016.00
Kepala Tukang L.03 OH 0.006 Rp 147,900.00 Rp 887.40
Mandor L.17 OH 0.002 Rp 158,000.00 Rp 316.00
JUMLAH TENAGA KERJA Rp 12,873.40
B. BAHAN
Pipa PVC m' 1.200 Rp 8,000.00 Rp 9,600.00
JUMLAH HARGA BAHAN Rp 9,600.00

C. PERALATAN 35% Harga Pipa Rp 8,000.00 Rp 2,800.00


JUMLAH HARGA ALAT Rp 2,800.00

D. Jumlah (A + B + C) Rp 25,273.40
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 25,273.40
M.8 1 M' PAS. PIPA PVC TIPE AW 1"
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.036 Rp 101,500.00 Rp 3,654.00
Tukang Batu L.02 OH 0.060 Rp 133,600.00 Rp 8,016.00
Kepala Tukang L.03 OH 0.006 Rp 147,900.00 Rp 887.40
Mandor L.17 OH 0.002 Rp 158,000.00 Rp 316.00
JUMLAH TENAGA KERJA Rp 12,873.40
B. BAHAN
Pipa PVC m' 1.200 Rp 15,075.00 Rp 18,090.00
JUMLAH HARGA BAHAN Rp 18,090.00

C. PERALATAN 35% Harga Pipa Rp 15,075.00 Rp 5,276.25


JUMLAH HARGA ALAT Rp 5,276.25

D. Jumlah (A + B + C) Rp 36,239.65
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 36,239.65

M.9 1 M' PAS. PIPA PVC TIPE AW 4"


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.081 Rp 101,500.00 Rp 8,221.50
Tukang Batu L.02 OH 0.135 Rp 133,600.00 Rp 18,036.00
Kepala Tukang L.03 OH 0.014 Rp 147,900.00 Rp 1,996.65
Mandor L.17 OH 0.004 Rp 158,000.00 Rp 632.00
JUMLAH TENAGA KERJA Rp 28,886.15
B. BAHAN
Pipa PVC m' 1.200 Rp 78,300.00 Rp 93,960.00
JUMLAH HARGA BAHAN Rp 93,960.00

C. PERALATAN 35% Harga Pipa Rp 78,300.00 Rp 27,405.00


JUMLAH HARGA ALAT Rp 27,405.00

D. Jumlah (A + B + C) Rp 150,251.15
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 150,251.15
M.10 Pipa PVC D Ø 0,75"
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Tukang Batu L.01 OH 0.036 Rp 133,600.00 Rp 4,809.60
Kepala Tukang L.02 OH 0.060 Rp 147,900.00 Rp 8,874.00
Pekerja L.03 OH 0.006 Rp 101,500.00 Rp 609.00
Mandor L.17 OH 0.002 Rp 158,000.00 Rp 316.00
JUMLAH TENAGA KERJA Rp 14,608.60
B. BAHAN
Pipa PVC D m' 1.200 Rp 8,550.00 Rp 10,260.00
Perlengkapan Ls 35% Harga Pip Rp 8,550.00 Rp 2,992.50
JUMLAH HARGA BAHAN Rp 13,252.50

C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 27,861.10
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 27,861.10

M.11 Pipa PVC D Ø 1"


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Tukang Batu L.01 OH 0.036 Rp 133,600.00 Rp 4,809.60
Kepala Tukang Batu L.02 OH 0.060 Rp 147,900.00 Rp 8,874.00
Pekerja L.03 OH 0.006 Rp 101,500.00 Rp 609.00
Mandor L.17 OH 0.002 Rp 158,000.00 Rp 316.00
JUMLAH TENAGA KERJA Rp 14,608.60
B. BAHAN
Pipa PVC D m' 1.200 Rp 10,125.00 Rp 12,150.00
Perlengkapan Ls 35% Harga Pip Rp 10,125.00 Rp 3,543.75
JUMLAH HARGA BAHAN Rp 15,693.75

C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 30,302.35
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 30,302.35
M.12 Pipa PVC D Ø 1,5"
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Tukang Batu L.01 OH 0.081 Rp 133,600.00 Rp 10,821.60
Kepala Tukang Batu L.02 OH 0.135 Rp 147,900.00 Rp 19,966.50
Pekerja L.03 OH 0.014 Rp 101,500.00 Rp 1,370.25
Mandor L.17 OH 0.004 Rp 158,000.00 Rp 632.00
JUMLAH TENAGA KERJA Rp 32,790.35
B. BAHAN
Pipa PVC D m' 1.200 Rp 11,475.00 Rp 13,770.00
Perlengkapan Ls 35% Harga Pip Rp 11,475.00 Rp 4,016.25
JUMLAH HARGA BAHAN Rp 17,786.25

C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 50,576.60
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 50,576.60

M.13 Pipa PVC D Ø 2"


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Tukang Batu L.01 OH 0.081 Rp 133,600.00 Rp 10,821.60
Kepala Tukang Batu L.02 OH 0.135 Rp 147,900.00 Rp 19,966.50
Pekerja L.03 OH 0.014 Rp 101,500.00 Rp 1,370.25
Mandor L.17 OH 0.004 Rp 158,000.00 Rp 632.00
JUMLAH TENAGA KERJA Rp 32,790.35
B. BAHAN
Pipa PVC D m' 1.200 Rp 17,100.00 Rp 20,520.00
Perlengkapan Ls 35% Harga Pip Rp 17,100.00 Rp 5,985.00
JUMLAH HARGA BAHAN Rp 26,505.00

C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 59,295.35
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 59,295.35
M.14 Pipa PVC D Ø 2,5"
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Tukang Batu L.01 OH 0.081 Rp 133,600.00 Rp 10,821.60
Kepala Tukang Batu L.02 OH 0.135 Rp 147,900.00 Rp 19,966.50
Pekerja L.03 OH 0.014 Rp 101,500.00 Rp 1,370.25
Mandor L.17 OH 0.004 Rp 158,000.00 Rp 632.00
JUMLAH TENAGA KERJA Rp 32,790.35
B. BAHAN
Pipa PVC D m' 1.200 Rp 22,950.00 Rp 27,540.00
Perlengkapan Ls 35% Harga Pip Rp 22,950.00 Rp 8,032.50
JUMLAH HARGA BAHAN Rp 35,572.50

C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 68,362.85
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 68,362.85

M.15 Pipa PVC D Ø 3"


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Tukang Batu L.01 OH 0.081 Rp 133,600.00 Rp 10,821.60
Kepala Tukang Batu L.02 OH 0.135 Rp 147,900.00 Rp 19,966.50
Pekerja L.03 OH 0.014 Rp 101,500.00 Rp 1,370.25
Mandor L.17 OH 0.004 Rp 158,000.00 Rp 632.00
JUMLAH TENAGA KERJA Rp 32,790.35
B. BAHAN
Pipa PVC D m' 1.200 Rp 31,500.00 Rp 37,800.00
Perlengkapan Ls 35% Harga Pip Rp 31,500.00 Rp 11,025.00
JUMLAH HARGA BAHAN Rp 48,825.00

C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 81,615.35
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 81,615.35
M.16 Pipa PVC D Ø 4"
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Tukang Batu L.01 OH 0.081 Rp 133,600.00 Rp 10,821.60
Kepala Tukang Batu L.02 OH 0.135 Rp 147,900.00 Rp 19,966.50
Pekerja L.03 OH 0.014 Rp 101,500.00 Rp 1,370.25
Mandor L.17 OH 0.004 Rp 158,000.00 Rp 632.00
JUMLAH TENAGA KERJA Rp 32,790.35
B. BAHAN
Pipa PVC D m' 1.200 Rp 45,675.00 Rp 54,810.00
Perlengkapan Ls 35% Harga Pip Rp 45,675.00 Rp 15,986.25
JUMLAH HARGA BAHAN Rp 70,796.25

C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 103,586.60
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 103,586.60

N. PEKERJAAN LAIN-LAIN
N.1 3 M3 Bronjong Kawat 4 MM Untuk Diisi Batu Kali
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja ( Penganyam) L.01 OH 1.800 Rp 111,700.00 Rp 201,060.00
Tukang Besi ( Penganyam) L.08 OH 2.200 Rp 109,100.00 Rp 240,020.00
Mandor ( Penganyam) L.18 OH 0.080 Rp 140,200.00 Rp 11,216.00
Pekerja L.01 OH 4.500 Rp 101,500.00 Rp 456,750.00
Mandor L.17 OH 0.750 Rp 158,000.00 Rp 118,500.00
JUMLAH TENAGA KERJA Rp 1,027,546.00
B. BAHAN
Kawat 4 MM kg 45.000 Rp 20,700.00 Rp 931,500.00
Batu Pasang M3 3.000 Rp 256,500.00 Rp 769,500.00
JUMLAH HARGA BAHAN Rp 1,701,000.00

C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 2,728,546.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 2,728,546.00
1 M3 besi bronjong Rp 909,515.33
N.2 Membuat 1 m3 beton cor 1:3:5
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.650 Rp 101,500.00 Rp 167,475.00
Tukang Batu L.02 OH 0.200 Rp 133,600.00 Rp 26,720.00
Kepala Tukang L.03 OH 0.020 Rp 147,900.00 Rp 2,958.00
Mandor L.17 OH 0.060 Rp 158,000.00 Rp 9,480.00
JUMLAH TENAGA KERJA Rp 206,633.00
B. BAHAN
Semen Portland Kg 230.000 Rp 1,485.00 Rp 341,550.00
Pasir Beton m3 0.610 Rp 206,100.00 Rp 125,721.00
Kerikil (Maks 30mm) m3 0.760 Rp 258,300.00 Rp 196,308.00
Air Liter 215.000 Rp - Rp -
JUMLAH HARGA BAHAN Rp 663,579.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 870,212.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 870,212.00

N.3 Membuat 1 m3 beton cor 1:2:3


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 2.000 Rp 101,500.00 Rp 203,000.00
Tukang Batu L.02 OH 0.350 Rp 133,600.00 Rp 46,760.00
Kepala Tukang L.03 OH 0.035 Rp 147,900.00 Rp 5,176.50
Mandor L.17 OH 1.000 Rp 158,000.00 Rp 158,000.00
JUMLAH TENAGA KERJA Rp 412,936.50
B. BAHAN
Semen Portland Kg 336.000 Rp 1,485.00 Rp 498,960.00
Pasir Beton m3 0.540 Rp 206,100.00 Rp 111,294.00
Kerikil (Maks 30mm) Kg 0.810 Rp 258,300.00 Rp 209,223.00
Air Liter 215.000 Rp - Rp -
JUMLAH HARGA BAHAN Rp 819,477.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 1,232,413.50
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 1,232,413.50
N.4 Membuat 1 m3 Pengeresek
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 2.650 Rp 101,500.00 Rp 268,975.00
Tukang Batu L.02 OH 1.000 Rp 133,600.00 Rp 133,600.00
Kepala Tukang L.03 OH 0.100 Rp 147,900.00 Rp 14,790.00
Mandor L.17 OH 0.040 Rp 158,000.00 Rp 6,320.00
JUMLAH TENAGA KERJA Rp 423,685.00
B. BAHAN
Semen Portland Kg 125.000 Rp 1,485.00 Rp 185,625.00
Pasir Beton m3 0.544 Rp 206,100.00 Rp 112,118.40
Kerikil (Maks 30mm) m3 0.970 Rp 258,300.00 Rp 250,551.00
Air Liter 215.000 Rp - Rp -
JUMLAH HARGA BAHAN Rp 548,294.40
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 971,979.40
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 971,979.40

N.5 Pemasangan 1 m2 Pasangan Steger


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.057 Rp 101,500.00 Rp 5,785.50
Tukang Kayu L.04 OH 0.057 Rp 140,800.00 Rp 8,025.60
Kepala Tukang L.05 OH 0.003 Rp 152,300.00 Rp 456.90
Mandor L.17 OH 0.006 Rp 158,000.00 Rp 948.00
JUMLAH TENAGA KERJA Rp 15,216.00
B. BAHAN
Kayu usuk Kruwing m3 0.002 Rp 8,251,200.00 Rp 16,502.40
Paku Usuk kg 0.200 Rp 18,900.00 Rp 3,780.00
Bambu buah 3.000 Rp 13,500.00 Rp 40,500.00
Kawat Beton kg 0.200 Rp 25,200.00 Rp 5,040.00
JUMLAH HARGA BAHAN Rp 65,822.40
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 81,038.40
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 81,038.40
G Harga Satuan Pekerjaan (D+E)/ 2 X PAKAI Rp 40,519.20
N.6 Pemasangan 1 m kusen pintu aluminium
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.043 Rp 101,500.00 Rp 4,364.50
Tukang khusus alluminium OH 0.043 Rp 119,400.00 Rp 5,134.20
Kepala Tukang L.05 OH 0.004 Rp 129,800.00 Rp 558.14
Mandor L.17 OH 0.002 Rp 158,000.00 Rp 331.80
JUMLAH TENAGA KERJA Rp 10,388.64
B. BAHAN
Profil alluminium m 1.100 Rp 143,200.00 Rp 157,520.00
Skrup fixer bh 2.000 Rp 1,100.00 Rp 2,200.00
Sealant kg 0.050 Rp 147,300.00 Rp 7,365.00
JUMLAH HARGA BAHAN Rp 167,085.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 177,473.64
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 177,473.64

N.7 Pemasangan 1 m2 pintu kaca rangka aluminium


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.085 Rp 101,500.00 Rp 8,627.50
Tukang alluminium/kaca OH 0.085 Rp 119,400.00 Rp 10,149.00
Kepala Tukang L.05 OH 0.009 Rp 129,800.00 Rp 1,168.20
Mandor L.17 OH 0.005 Rp 158,000.00 Rp 790.00
JUMLAH TENAGA KERJA Rp 20,734.70
B. BAHAN
Pintu alluminium m 4.400 Rp 143,500.00 Rp 631,400.00
Profil kaca m2 1.000 Rp 80,300.00 Rp 80,300.00
Sealant kg 0.050 Rp 147,300.00 Rp 7,365.00
JUMLAH HARGA BAHAN Rp 719,065.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 739,799.70
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 739,799.70
N.8 Pemasangan 1 Unit Pintu Baja Ruang Genzet (Komplit Aksesoris)
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.100 Rp 101,500.00 Rp 10,150.00
Tukang alluminium/kaca OH 0.100 Rp 119,400.00 Rp 11,940.00
Kepala Tukang L.05 OH 0.050 Rp 129,800.00 Rp 6,490.00
Mandor L.17 OH 0.005 Rp 158,000.00 Rp 790.00
JUMLAH TENAGA KERJA Rp 29,370.00
B. BAHAN
Pintu Baja Ruang Genzet (Komplit) Unit 1.000 Rp 6,000,000.00 Rp 6,000,000.00
JUMLAH HARGA BAHAN Rp 6,000,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 6,029,370.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 6,029,370.00
ANALISA TAMBAHAN

O.1 1 m3 Pengalian Tanah Area Cut


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.2260 101,500.00 22,939.00
Mandor L.17 OH 0.0070 158,000.00 1,106.00
JUMLAH TENAGA KERJA 24,045.00
B. BAHAN
JUMLAH HARGA BAHAN -
C. PERALATAN
Excavator JAM 0.0760 276,000.00 20,976.00
JUMLAH HARGA ALAT 20,976.00

D. Jumlah (A + B + C) 45,021.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 45,021.00

0.2 1 m2 Pembersihan Lokasi


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1000 101,500.00 10,150.00
Mandor L.17 OH 0.0050 158,000.00 790.00
JUMLAH TENAGA KERJA 10,940.00
B. BAHAN -
JUMLAH HARGA BAHAN -
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 10,940.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 10,940.00
O.3 1 m1 Saluran Air DPT Dengan Bambu Dan Ijuk
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0200 101,500.00 2,030.00
Mandor L.17 OH 0.0100 158,000.00 1,580.00
JUMLAH TENAGA KERJA 3,610.00
B. BAHAN
Bambu Btang 0.16666666667 20700 3,450.00
Ijuk Kg 0.01 37800 378.00

JUMLAH HARGA BAHAN 3,828.0000


C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 7,438.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 7,438.00

O.4 Pemasangan 1 titik instalasi Lampu


No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp)
A. TENAGA
Biaya Pasang exhausvan bh 1.000 50,000 50,000.00
Jumlah Tenaga Ke 50,000.00
B. BAHAN
Kabel NYM 3 x 2,5 mm ex. Suprem m 8.000 12,000.00 96,000.00
Pipa Clipsal 20 cc ex. Supreme bt 3.000 5,000.00 15,000.00
Tee dos Clipsal 20 mm hitam bh 2.000 2,000.00 4,000.00
Klem Clipsal 20 mm hitam bh 10.000 1,000.00 10,000.00
Sock Clipsal 20 mm hitam bh 2.000 1,000.00 2,000.00
Inbow dos plastik Clipsal E157P bh 1.000 2,000.00 2,000.00
Jumlah Harga Ba 129,000.00
C. PERALATAN
Jumlah Harga Alat
D. Jumlah (A+B+C) Rp 179,000.00
E. Overhead & Profit (5% x D) Rp 8,950.00
F. Harga Satuan Pekerjaan (D+E) Rp 187,950.00
O.5 Pemasangan 1set lampu Downlight 11 watt

No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp)


A. TENAGA
Biaya Pasang lampu Downlight 18 w bh 1.000 10,000 10,000.00
Jumlah Tenaga Ke 10,000.00
B. BAHAN
Lampu DL + PL 11 watt m 1.000 66,000.00 66,000.00
Material Bantu (isolasi, las dop dll) lot 0.075 66,000.00 4,950.00
Gantunagn (mur , baut dll) bh 0.100 66,000.00 6,600.00

Jumlah Harga Ba 77,550.00


C. PERALATAN
Jumlah Harga Alat
D. Jumlah (A+B+C) Rp 87,550.00
E. Overhead & Profit (5% x D) Rp 4,377.50
F. Harga Satuan Pekerjaan (D+E) Rp 91,927.50

O.6 Pemasangan 1set lampu Essensial 18 watt

No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp)


A. TENAGA
Biaya Pasang lampu bh 1.000 7,500 7,500.00
Jumlah Tenaga Ke 7,500.00
B. BAHAN
Lampu esensial 18 watt m 1.000 45,000.00 45,000.00
Material Bantu (isolasi, las dop dll) lot 0.075 45,000.00 3,375.00
Gantunagn (mur , baut dll) bh 0.100 45,000.00 4,500.00

Jumlah Harga Ba 52,875.00


C. PERALATAN
Jumlah Harga Alat
D. Jumlah (A+B+C) Rp 60,375.00
E. Overhead & Profit (5% x D) Rp 3,018.75
F. Harga Satuan Pekerjaan (D+E) Rp 63,393.75
O.7 Pemasangan 1set lampu Tl. 2x18 watt

No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp)


A. TENAGA
Biaya Pasang lampu bh 1.000 15,000 15,000.00
Jumlah Tenaga Ke 15,000.00
B. BAHAN
Lampu Tl. 2x 18 watt m 2.000 150,000.00 300,000.00
Material Bantu (isolasi, las dop dll) lot 0.075 300,000.00 22,500.00
Gantunagn (mur , baut dll) bh 0.100 300,000.00 30,000.00

Jumlah Harga Ba 352,500.00


C. PERALATAN
Jumlah Harga Alat
D. Jumlah (A+B+C) Rp 367,500.00
E. Overhead & Profit (5% x D) Rp 18,375.00
F. Harga Satuan Pekerjaan (D+E) Rp 385,875.00

O.8 Pemasangan 1bh Stop kontak

No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp)


A. TENAGA
Upah Pasang ls 1.000 5,000 5,000.00
Jumlah Tenaga Ke 5,000.00
B. BAHAN
Stop Kontak bh 1.000 35,000.00 35,000.00

Jumlah Harga Ba 35,000.00


C. PERALATAN
Jumlah Harga Alat
D. Jumlah (A+B+C) Rp 40,000.00
E. Overhead & Profit (5% x D) Rp 2,000.00
F. Harga Satuan Pekerjaan (D+E) Rp 42,000.00
O.9 Pemasangan 1bh Saklar

No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp)


A. TENAGA
Upah Pasang ls 1.000 5,000.00 5,000.00
Jumlah Tenaga Ke 5,000.00
B. BAHAN
Saklar bh 1.000 25,000.00 25,000.00

Jumlah Harga Ba 25,000.00


C. PERALATAN
Jumlah Harga Alat
D. Jumlah (A+B+C) Rp 30,000.00
E. Overhead & Profit (5% x D) Rp 1,500.00
F. Harga Satuan Pekerjaan (D+E) Rp 31,500.00

O.10 Pemasangan 1 titik Instalasi exhausvan

No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp)


A. TENAGA
Biaya Pasang exhausvan bh 1.000 50,000 50,000.00
Jumlah Tenaga Ke 50,000.00
B. BAHAN
Kabel NYM 3 x 2,5 mm ex. Suprem m 10.000 12,000.00 120,000.00
Pipa Clipsal 20 cc ex. Supreme bt 3.000 5,000.00 15,000.00
Tee dos Clipsal 20 mm hitam bh 2.000 2,000.00 4,000.00
Klem Clipsal 20 mm hitam bh 10.000 1,000.00 10,000.00
Sock Clipsal 20 mm hitam bh 2.000 1,000.00 2,000.00
Inbow dos plastik Clipsal E157P bh 1.000 2,000.00 2,000.00
Jumlah Harga Ba 153,000.00
C. PERALATAN
Jumlah Harga Alat
D. Jumlah (A+B+C) Rp 203,000.00
E. Overhead & Profit (5% x D) Rp 10,150.00
F. Harga Satuan Pekerjaan (D+E) Rp 213,150.00
O.11 Pemasangan 1 m² langit-langit gedeg kelas 1
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.100 Rp 101,500.00 Rp 10,150.00
Tukang Kayu L.04 OH 0.100 Rp 140,800.00 Rp 14,080.00
Kepala Tukang L.05 OH 0.010 Rp 152,300.00 Rp 1,523.00
Mandor L.17 OH 0.005 Rp 158,000.00 Rp 790.00
JUMLAH TENAGA KERJA Rp 26,543.00
B. BAHAN
Gedeg Kulit Kelasa 1 m2 1.000 Rp 34,200.00 Rp 34,200.00
Paku tripleks Kg 0.030 Rp 18,300.00 Rp 549.00
JUMLAH HARGA BAHAN Rp 34,749.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 61,292.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 61,292.00

O.12 Pemasangan 1 m² lantai keramik ukuran 40 cm x 40 cm Polish


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.700 Rp 101,500.00 Rp 71,050.00
Tukang Batu L.02 OH 0.350 Rp 133,600.00 Rp 46,760.00
Kepala Tukang L.03 OH 0.035 Rp 147,900.00 Rp 5,176.50
Mandor L.17 OH 0.035 Rp 158,000.00 Rp 5,530.00
JUMLAH TENAGA KERJA Rp 128,516.50
B. BAHAN
Keramik 40 x 40 Asiatile Polish m2 1.000 Rp 69,000.00 Rp 69,000.00
Semen Portland Kg 9.800 Rp 1,485.00 Rp 14,553.00
Pasir Pasang M³ 0.045 Rp 207,900.00 Rp 9,355.50
Semen warna Kg 1.300 Rp 21,600.00 Rp 28,080.00
JUMLAH HARGA BAHAN Rp 120,988.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 249,505.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 249,505.00
O.13 Pemasangan 1 m² lantai keramik ukuran 40 cm x 40 cm Unpolish
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.700 Rp 101,500.00 Rp 71,050.00
Tukang Batu L.02 OH 0.350 Rp 133,600.00 Rp 46,760.00
Kepala Tukang L.03 OH 0.035 Rp 147,900.00 Rp 5,176.50
Mandor L.17 OH 0.035 Rp 158,000.00 Rp 5,530.00
JUMLAH TENAGA KERJA Rp 128,516.50
B. BAHAN
Keramik 40 x 40 Asiatile Polish m2 1.000 Rp 75,000.00 Rp 75,000.00
Semen Portland Kg 9.800 Rp 1,485.00 Rp 14,553.00
Pasir Pasang M³ 0.045 Rp 207,900.00 Rp 9,355.50
Semen warna Kg 1.300 Rp 21,600.00 Rp 28,080.00
JUMLAH HARGA BAHAN Rp 126,988.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 255,505.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 255,505.00

O.14 1 PS PASANG ENGSEL PINTU STENLESS


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

A. TENAGA
Tukang Besi L.02 OH 0.1250 143,600.00 17,950.00
Kepala Tukang L.03 OH 0.0130 147,900.00 1,922.70
JUMLAH TENAGA KERJA 19,872.70
B. BAHAN
Engsel Pintu ps 1.0000 55,000.00 55,000.00
JUMLAH HARGA BAHAN 55,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 74,872.70
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 74,872.70
O.15 1 PS PASANG KAIT ANGIN STENLESS
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

A. TENAGA
Tukang Besi L.02 OH 0.1250 143,600.00 17,950.00
Kepala Tukang L.03 OH 0.0130 147,900.00 1,922.70
JUMLAH TENAGA KERJA 19,872.70
B. BAHAN
Kait Angin ps 1.0000 39,000.00 39,000.00
JUMLAH HARGA BAHAN 39,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 58,872.70
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 58,872.70

O.16 1 PS PASANG ENGSEL JENDELA STENLESS


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

A. TENAGA
Tukang Besi L.02 OH 0.1250 143,600.00 17,950.00
Kepala Tukang L.03 OH 0.0130 147,900.00 1,922.70
JUMLAH TENAGA KERJA 19,872.70
B. BAHAN
engsel jendela ps 1.0000 50,000.00 50,000.00
JUMLAH HARGA BAHAN 50,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 69,872.70
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 69,872.70
O.17 1 PS PASANG HANDLE + KUNCI SLOT
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

A. TENAGA
Tukang Besi L.02 OH 0.1250 143,600.00 17,950.00
Kepala Tukang L.03 OH 0.0130 147,900.00 1,922.70
JUMLAH TENAGA KERJA 19,872.70
B. BAHAN
handle + kunci slot set 1.0000 310,000.00 310,000.00
JUMLAH HARGA BAHAN 310,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 329,872.70
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 329,872.70

O.18 Pemasangan 1 m² lantai keramik ukuran 20 cm x 20 cm Polish


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.700 Rp 101,500.00 Rp 71,050.00
Tukang Batu L.02 OH 0.350 Rp 133,600.00 Rp 46,760.00
Kepala Tukang L.03 OH 0.035 Rp 147,900.00 Rp 5,176.50
Mandor L.17 OH 0.035 Rp 158,000.00 Rp 5,530.00
JUMLAH TENAGA KERJA Rp 128,516.50
B. BAHAN
Keramik 20 x 20 Asiatile Polish m2 1.000 Rp 55,000.00 Rp 55,000.00
Semen Portland Kg 9.800 Rp 1,485.00 Rp 14,553.00
Pasir Pasang M³ 0.045 Rp 207,900.00 Rp 9,355.50
Semen warna Kg 1.300 Rp 21,600.00 Rp 28,080.00
JUMLAH HARGA BAHAN Rp 106,988.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 235,505.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 235,505.00
O.19 Pemasangan 1 m² lantai keramik ukuran 20 cm x 20 cm Unpolish
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.700 Rp 101,500.00 Rp 71,050.00
Tukang Batu L.02 OH 0.350 Rp 133,600.00 Rp 46,760.00
Kepala Tukang L.03 OH 0.035 Rp 147,900.00 Rp 5,176.50
Mandor L.17 OH 0.035 Rp 158,000.00 Rp 5,530.00
JUMLAH TENAGA KERJA Rp 128,516.50
B. BAHAN
Keramik 20 x 20 Asiatile Polish m2 1.000 Rp 60,000.00 Rp 60,000.00
Semen Portland Kg 9.800 Rp 1,485.00 Rp 14,553.00
Pasir Pasang M³ 0.045 Rp 207,900.00 Rp 9,355.50
Semen warna Kg 1.300 Rp 21,600.00 Rp 28,080.00
JUMLAH HARGA BAHAN Rp 111,988.50
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 240,505.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 240,505.00

O.20 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

A. TENAGA
Tukang Pipa L.01 OH 0.1000 101,500.00 10,150.00
Kepala Tukang L.02 OH 0.0100 147,900.00 1,479.00
JUMLAH TENAGA KERJA 11,629.00
B. BAHAN
Kran air bh 1.0000 40,000.00 40,000.00
Seal tape bh 0.0250 6,000.00 150.00
JUMLAH HARGA BAHAN 40,150.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 51,779.00
E. Overhead & Profit 0 %xD
F. Harga Satuan Pekerjaan (D+E) 51,779.00
O.21 1 M3 PASANGAN KANSTIN KURSI
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.280 101,500.00 28,420.00
Mandor L.02 OH 0.019 158,000.00 3,002.00
JUMLAH TENAGA KERJA 31,422.00
B. BAHAN
Kanstin Kursi M1 1.000 85,000.00 85,000.00
JUMLAH HARGA BAHAN 85,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 116,422.00
E. Overhead & Profit 0 %xD -
F. Harga Satuan Pekerjaan (D+E) 116,422.00
O.22 Pengurugan 1 m3 Sirtu
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.300 Rp 101,500.00 Rp 30,450.00
Mandor L.17 OH 0.010 Rp 158,000.00 Rp 1,580.00
JUMLAH TENAGA KERJA Rp 32,030.00
B. BAHAN
Pasir Batu (Sirtu) m3 1.200 Rp 199,800.00 Rp 239,760.00
JUMLAH HARGA BAHAN Rp 239,760.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 271,790.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 271,790.00

O.23 Pemasangan 1 m2 Batako 1 : 5 Rebah


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.320 Rp 101,500.00 Rp 32,480.00
Tukang Batu L.02 OH 0.100 Rp 133,600.00 Rp 13,360.00
Kepala Tukang L.03 OH 0.010 Rp 147,900.00 Rp 1,479.00
Mandor L.17 OH 0.015 Rp 158,000.00 Rp 2,370.00
JUMLAH TENAGA KERJA Rp 49,689.00
B. BAHAN
Batako Bh 25.000 Rp 2,500.00 Rp 62,500.00
Semen Portland Kg 15.000 Rp 1,485.00 Rp 22,275.00
Pasir Pasang M3 0.054 Rp 207,900.00 Rp 11,226.60
JUMLAH HARGA BAHAN Rp 96,001.60
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 145,690.60
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 145,690.60
O.24 Pekerjaan 1 m Bore Pile Ø30
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.650 Rp 101,500.00 Rp 167,475.00
Tukang Batu L.02 OH 0.275 Rp 133,600.00 Rp 36,740.00
Kepala Tukang L.03 OH 0.028 Rp 147,900.00 Rp 4,141.20
Mandor L.17 OH 0.083 Rp 158,000.00 Rp 13,114.00
JUMLAH TENAGA KERJA Rp 221,470.20
B. BAHAN
Beton K-300 m3 0.071 Rp 1,130,379.46 Rp 79,901.82
Baja Tulangan kg 17.742 Rp 10,917.27 Rp 193,695.78
Casingan m2 0.942 Rp 9,000.00 Rp 8,482.30
JUMLAH HARGA BAHAN Rp 282,079.90
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 503,550.10
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 503,550.10

O.25 Pemasangan 1 m2 bekisting untuk Dinding Beton


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.660 Rp 101,500.00 Rp 66,990.00
Tukang Kayu L.04 OH 0.330 Rp 140,800.00 Rp 46,464.00
Kepala Tukang L.05 OH 0.033 Rp 152,300.00 Rp 5,025.90
Mandor L.17 OH 0.033 Rp 158,000.00 Rp 5,214.00
JUMLAH TENAGA KERJA Rp 123,693.90
B. BAHAN
Kayu kelas III m3 0.030 Rp 4,032,000.00 Rp 120,960.00
Paku 5 - 12 cm kg 0.400 Rp 18,900.00 Rp 7,560.00
Minyak bekisting/Solar Liter 0.200 Rp 8,100.00 Rp 1,620.00
Balok kayu kelas II m3 0.005 Rp 7,682,400.00 Rp 34,570.80
Plywood tebal 9 mm Lbr 0.350 Rp 136,800.00 Rp 47,880.00

JUMLAH HARGA BAHAN Rp 212,590.80


C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 336,284.70
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 336,284.70
G Harga Satuan Pekerjaan (D+E)/ HARGA 2 X PAKAI Rp 336,284.70
O.26 Pekerjaan 1 m Beton Kanstein
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.950 Rp 101,500.00 Rp 96,425.00
Tukang Batu L.02 OH 0.350 Rp 133,600.00 Rp 46,760.00
Kepala Tukang L.03 OH 0.035 Rp 147,900.00 Rp 5,176.50
Mandor L.17 OH 0.095 Rp 158,000.00 Rp 15,010.00
JUMLAH TENAGA KERJA Rp 163,371.50
B. BAHAN
Semen Portland Kg 22.500 Rp 1,485.00 Rp 33,412.50
Pasir Pasang m3 0.0023 Rp 207,900.00 Rp 478.17
Kanstein m 1.000 Rp 30,000.00 Rp 30,000.00
JUMLAH HARGA BAHAN Rp 63,890.67
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 227,262.17
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 227,262.17

O.27 Pekerjaan 1 m2 Floor Hardener


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.120 Rp 101,500.00 Rp 12,180.00
Tukang Batu L.02 OH 0.120 Rp 133,600.00 Rp 16,032.00
Kepala Tukang L.03 OH 0.012 Rp 147,900.00 Rp 1,774.80
Mandor L.17 OH 0.006 Rp 158,000.00 Rp 948.00
JUMLAH TENAGA KERJA Rp 30,934.80
B. BAHAN
Floor hardener Kg 5.000 Rp 12,000.00 Rp 60,000.00

JUMLAH HARGA BAHAN Rp 60,000.00


C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 90,934.80
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 90,934.80
O.28 Pekerjaan 1 m2 Pemasangan Bata Ringan
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.671 Rp 101,500.00 Rp 68,106.50
Tukang Batu L.02 OH 1.300 Rp 133,600.00 Rp 173,680.00
Kepala Tukang L.03 OH 0.130 Rp 147,900.00 Rp 19,227.00
Mandor L.17 OH 0.003 Rp 158,000.00 Rp 474.00
JUMLAH TENAGA KERJA Rp 261,487.50
B. BAHAN
Bata Ringan Tebal 10 cm Bh 8.400 Rp 12,000.00 Rp 100,800.00
Mortar Siap Pakai kg 0.0630 Rp 15,000.00 Rp 945.00

JUMLAH HARGA BAHAN Rp 101,745.00


C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 363,232.50
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 363,232.50

O.29 Pekerjaan 1 m2 Pemasangan Batu Candi


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.500 Rp 101,500.00 Rp 50,750.00
Tukang Batu L.02 OH 1.015 Rp 133,600.00 Rp 135,604.00
Kepala Tukang L.03 OH 0.050 Rp 147,900.00 Rp 7,395.00
Mandor L.17 OH 0.050 Rp 158,000.00 Rp 7,900.00
JUMLAH TENAGA KERJA Rp 201,649.00
B. BAHAN
Batu Candi m2 1.100 Rp 174,250.00 Rp 191,675.00
Semen Portland kg 10.0400 Rp 1,485.00 Rp 14,909.40
Pasir Pasang m3 0.045 Rp 207,900.00 Rp 9,355.50
JUMLAH HARGA BAHAN Rp 215,939.90
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 417,588.90
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 417,588.90
O.30 Pekerjaan 1 Pasang Engsel Jendela & Jendela
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.010 Rp 101,500.00 Rp 1,015.00
Tukang Besi L.08 OH 0.100 Rp 125,000.00 Rp 12,500.00
Kepala Tukang L.09 OH 0.010 Rp 143,600.00 Rp 1,436.00
Mandor L.17 OH 0.001 Rp 158,000.00 Rp 79.00
JUMLAH TENAGA KERJA Rp 15,030.00
B. BAHAN
Engsel Jendela Ps 1.000 Rp 43,200.00 Rp 43,200.00

JUMLAH HARGA BAHAN Rp 43,200.00


C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 58,230.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 58,230.00

O.31 Pekerjaan 1 Pasang Kait Angin


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.015 Rp 101,500.00 Rp 1,522.50
Tukang Besi L.08 OH 0.150 Rp 125,000.00 Rp 18,750.00
Kepala Tukang L.09 OH 0.015 Rp 143,600.00 Rp 2,154.00
Mandor L.17 OH 0.001 Rp 158,000.00 Rp 126.40
JUMLAH TENAGA KERJA Rp 22,552.90
B. BAHAN
Kait Angin Ps 1.000 Rp 34,200.00 Rp 34,200.00

JUMLAH HARGA BAHAN Rp 34,200.00


C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 56,752.90
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 56,752.90
O.32 Pekerjaan 1 Buah Grendel
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.015 Rp 101,500.00 Rp 1,522.50
Tukang Besi L.08 OH 0.150 Rp 125,000.00 Rp 18,750.00
Kepala Tukang L.09 OH 0.015 Rp 143,600.00 Rp 2,154.00
Mandor L.17 OH 0.001 Rp 158,000.00 Rp 126.40
JUMLAH TENAGA KERJA Rp 22,552.90
B. BAHAN
Kait Angin Ps 1.000 Rp 24,300.00 Rp 24,300.00

JUMLAH HARGA BAHAN Rp 24,300.00


C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 46,852.90
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 46,852.90

O.33 Pekerjaan Pemadatan Tanah


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.500 Rp 101,500.00 Rp 50,750.00
Mandor L.17 OH 0.050 Rp 158,000.00 Rp 7,900.00
JUMLAH TENAGA KERJA Rp 58,650.00
B. BAHAN

JUMLAH HARGA BAHAN Rp -


C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 58,650.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 58,650.00
O.34 Pekerjaan 1 Lt Waterproofing Integral
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.100 Rp 101,500.00 Rp 10,150.00
Tukang Besi L.08 OH 0.100 Rp 125,000.00 Rp 12,500.00
Kepala Tukang L.09 OH 0.010 Rp 143,600.00 Rp 1,436.00
Mandor L.17 OH 0.010 Rp 158,000.00 Rp 1,580.00
JUMLAH TENAGA KERJA Rp 25,666.00
B. BAHAN
Waterproofing Integral Lt 1.000 Rp 150,000.00 Rp 150,000.00

JUMLAH HARGA BAHAN Rp 150,000.00


C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 175,666.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 175,666.00

O.35 Pekerjaan 1 Bh Pintu Besi Finishing Cat


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Biaya Pemasangan Ls 1.000 Rp 100,000.00 Rp 100,000.00
JUMLAH TENAGA KERJA Rp 100,000.00
B. BAHAN
Pintu Baja Finishing Cat ( Komplit) Lt 1.000 Rp 2,500,000.00 Rp 2,500,000.00

JUMLAH HARGA BAHAN Rp 2,500,000.00


C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 2,600,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 2,600,000.00
O.36 Pekerjaan 1 m Pagar Pembatas Kolam
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Biaya Pemasangan Ls 1.000 Rp 50,000.00 Rp 50,000.00
JUMLAH TENAGA KERJA Rp 50,000.00
B. BAHAN
Pipa Besi 10 cm m 1.100 Rp 358,000.00 Rp 393,800.00
Pipa Besi 5 cm m 1.900 Rp 110,100.00 Rp 209,190.00
Pipa Besi 2 cm m 4.500 Rp 33,300.00 Rp 149,850.00
Pengecatan ls 1.000 Rp 50,000.00 Rp 50,000.00

JUMLAH HARGA BAHAN Rp 802,840.00


C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 852,840.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 852,840.00

O.37 Pekerjaan 1 Set Filter Batu Apung


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Biaya Pemasangan Ls 1.000 Rp 10,000.00 Rp 10,000.00
JUMLAH TENAGA KERJA Rp 10,000.00
B. BAHAN
Batu Apung kg 72.000 Rp 15,000.00 Rp 1,080,000.00

JUMLAH HARGA BAHAN Rp 1,080,000.00


C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 1,090,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 1,090,000.00
O.38 Pekerjaan 1 Set Filter Bio Ball
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Biaya Pemasangan Ls 1.000 Rp 30,000.00 Rp 30,000.00
JUMLAH TENAGA KERJA Rp 30,000.00
B. BAHAN
2 Pack Bioball 300 Pcs Set 1.000 Rp 640,000.00 Rp 640,000.00

JUMLAH HARGA BAHAN Rp 640,000.00


C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 670,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 670,000.00

O.39 Pekerjaan 1 Set Filter Kapas ( 1 x 1 x 0,03 )


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Biaya Pemasangan Ls 1.000 Rp 30,000.00 Rp 30,000.00
JUMLAH TENAGA KERJA Rp 30,000.00
B. BAHAN
Kapas Set 1.000 Rp 687,500.00 Rp 687,500.00

JUMLAH HARGA BAHAN Rp 687,500.00


C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 717,500.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 717,500.00
O.40 Pekerjaan 1 Set Filter Denga Lampu Lampu UV H-36 inc (Pompa)
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Biaya Pemasangan Ls 1.000 Rp 100,000.00 Rp 100,000.00
JUMLAH TENAGA KERJA Rp 100,000.00
B. BAHAN
Filter UV Set 1.000 Rp 6,500,000.00 Rp 6,500,000.00

JUMLAH HARGA BAHAN Rp 6,500,000.00


C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 6,600,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 6,600,000.00

O.41 1 m2 Beton Dekoratif Bertextur


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Jasa Concrete Stamp M2 1.0000 320,000.00 320,000.00
JUMLAH TENAGA KERJA 320,000.00
B. BAHAN
Cat Dekoratif M2 1.0000 7,000.00 7,000.00
Gelar beton M2 1.0000 25,000.00 25,000.00

JUMLAH HARGA BAHAN 32,000.0000


C. PERALATAN
Alat Bantu JAM 0.0760 125,000.00 9,500.00
JUMLAH HARGA ALAT 9,500.00

D. Jumlah (A + B + C) 361,500.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 361,500.00
O.41 1 m2 Beton Dekoratif Bertextur
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Jasa Concrete Stamp M2 1.0000 320,000.00 320,000.00
JUMLAH TENAGA KERJA 320,000.00
B. BAHAN
Cat Dekoratif M2 1.0000 7,000.00 7,000.00
Gelar beton M2 1.0000 25,000.00 25,000.00

JUMLAH HARGA BAHAN 32,000.0000


C. PERALATAN
Alat Bantu JAM 0.0760 125,000.00 9,500.00
JUMLAH HARGA ALAT 9,500.00

D. Jumlah (A + B + C) 361,500.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 361,500.00
ANALISA TAMBAHAN
O.42 1 Set Penyelenggaraan SMK3
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA

JUMLAH TENAGA KERJA -


B. PERALATAN K3
Spanduk (banner) 300 x 80 cm bh 5.00 Rp 170,000.00 Rp 850,000.00
Poster Covid 19 bh 3.00 Rp 250,000.00 Rp 750,000.00
Papan Informasi K3 bh 2.00 Rp 300,000.00 Rp 600,000.00
Tali Keselamatan (Life Line) set 5.00 Rp 800,000.00 Rp 4,000,000.00
Topi Pelindung (Safety Helmet) bh 35.00 Rp 187,000.00 Rp 6,545,000.00
Pelindung pernafasan dan mulut (Masker) bh 200.00 Rp 11,000.00 Rp 2,200,000.00
Sarung tangan (safety gloves) psng 20.00 Rp 140,000.00 Rp 2,800,000.00
Sepatu keselamatan (Safety shoes)untuk staff kontraktor psng 15.00 Rp 300,000.00 Rp 4,500,000.00
Sepatu keselamatan (Rubber safety shoes and toe cap) psng 35.00 Rp 250,000.00 Rp 8,750,000.00
Rompi keselamatan (safety vest) bh 50.00 Rp 130,000.00 Rp 6,500,000.00
Peralatan K3 (Kotak P3k, Tandu, Obat Luka, Perban, Dll) Set 1.00 Rp 1,500,000.00 Rp 1,500,000.00
Tabung Oxigen unit 1.00 Rp 2,500,000.00 Rp 2,500,000.00
Thermoscan & Alat cek tensi unit 1.00 Rp 1,500,000.00 Rp 1,500,000.00
Hand sanitaser 500 ml ml 20.00 Rp 150,000.00 Rp 3,000,000.00
Cairan disinfektan liter 20.00 Rp 58,000.00 Rp 1,160,000.00
Ranjang kesehatan standar Set 1.00 Rp 1,530,000.00 Rp 1,530,000.00
JUMLAH HARGA BAHAN 48,685,000.0000
C. BAHAN

JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 48,685,000.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 48,685,000.00

O.43 Pemasangan 1 m² Tempelan Batu Paras


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Mandor L.12 OH 0.120 Rp 158,000.00 Rp 18,960.00
Kepala Tukang L.24 OH 0.110 Rp 152,300.00 Rp 16,753.00
Tukang Style bali L.01 OH 0.530 Rp 143,600.00 Rp 76,108.00
Pekerja L.17 OH 0.060 Rp 158,000.00 Rp 9,480.00
JUMLAH TENAGA KERJA Rp 121,301.00
B. BAHAN
Batu Candi Paras Bj 13.000 Rp 9,230.00 Rp 119,990.00
Semen Portland dan pasir Kg 30.000 Rp 4,465.00 Rp 133,950.00
JUMLAH HARGA BAHAN Rp 253,940.00
C. PERALATAN
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 375,241.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 375,241.00
O.44 Pembuatan dan pemasangan 1 M3 Saka Kayu Jati 15 x 15 cm
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 7.000 Rp 101,500.00 Rp 710,500.00
Tukang Kayu L.04 OH 21.000 Rp 140,800.00 Rp 2,956,800.00
Kepala Tukang L.05 OH 2.100 Rp 152,300.00 Rp 319,830.00
Mandor L.17 OH 0.350 Rp 158,000.00 Rp 55,300.00
JUMLAH TENAGA KERJA Rp 4,042,430.00
B. BAHAN
Balok Kayu Jati M³ 1.100 Rp 13,941,000.00 Rp 15,335,100.00
Paku usuk Kg 1.250 Rp 18,900.00 Rp 23,625.00
Lem kayu Kg 1.000 Rp 34,200.00 Rp 34,200.00
JUMLAH HARGA BAHAN Rp 15,392,925.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 19,435,355.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 19,435,355.00

O.45 1 M2 Pasang Atap Alderon


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Tukang Atap L.04 OH 0.160 Rp 146,500.00 Rp 23,440.00
Kepala Tukang L.05 OH 0.006 Rp 152,300.00 Rp 913.80
Pekerja L.01 OH 0.120 Rp 101,500.00 Rp 12,180.00
Mandor L.17 OH 0.006 Rp 158,000.00 Rp 948.00
JUMLAH TENAGA KERJA Rp 37,481.80
B. BAHAN
Alderon ID 860 lbr 0.698 Rp 121,000.00 Rp 84,458.00
Paku Skrup UVPC Alderon bh 14.000 Rp 2,200.00 Rp 30,800.00
JUMLAH HARGA BAHAN Rp 115,258.00

C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 152,739.80
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 152,739.80
O.46 1 M Pasangan kolom penguat 11 x 11 cm
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.180 Rp 101,500.00 Rp 18,270.00
Tukang Batu OH 0.020 Rp 133,600.00 Rp 2,672.00
Tukang Kayu OH 0.020 Rp 140,800.00 Rp 2,816.00
Tukang Besi OH 0.020 Rp 125,000.00 Rp 2,500.00
Kepala Tukang OH 0.006 Rp 152,300.00 Rp 913.80
Mandor OH 0.009 Rp 158,000.00 Rp 1,422.00
JUMLAH TENAGA KERJA Rp 28,593.80
B. BAHAN
Kayu Kelas III m3 0.001 Rp 9,104,400.00 Rp 9,104.40
Paku Biasa 5cm - 12cm kg 0.010 Rp 18,000.00 Rp 180.00
Minyak bekisting Liter Rp -
Besi Beton polos kg 3.000 Rp 11,997.22 Rp 35,991.66
Kawat Beton kg 0.450 Rp 32,000.00 Rp 14,400.00
Semen Portland ( Gersik) kg 4.000 Rp 1,485.00 Rp 5,940.00
Pasir Beton m3 0.006 Rp 207,900.00 Rp 1,247.40
Koral Beton m3 0.009 Rp 258,300.00 Rp 2,324.70
JUMLAH HARGA BAHAN Rp 69,188.16

C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 97,781.96
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 97,781.96

O.47 1 M Pasangan Sloof praktis 15 x 20 cm


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.180 Rp 101,500.00 Rp 18,270.00
Tukang Batu OH 0.020 Rp 133,600.00 Rp 2,672.00
Tukang Kayu OH 0.020 Rp 140,800.00 Rp 2,816.00
Tukang Besi OH 0.020 Rp 125,000.00 Rp 2,500.00
Kepala Tukang OH 0.006 Rp 152,300.00 Rp 913.80
Mandor OH 0.009 Rp 158,000.00 Rp 1,422.00
JUMLAH TENAGA KERJA Rp 28,593.80
B. BAHAN
Kayu Kelas III m3 0.002 Rp 9,104,400.00 Rp 18,208.80
Paku Biasa 5cm - 12cm kg 0.010 Rp 18,000.00 Rp 180.00
Minyak bekisting Liter Rp - Rp -
Besi Beton polos kg 3.000 Rp 11,997.22 Rp 35,991.66
Kawat Beton kg 0.450 Rp 32,000.00 Rp 14,400.00
Semen Portland ( Gersik) kg 4.000 Rp 1,485.00 Rp 5,940.00
Pasir Beton m3 0.006 Rp 207,900.00 Rp 1,247.40
Koral Beton m3 0.009 Rp 258,300.00 Rp 2,324.70
JUMLAH HARGA BAHAN Rp 78,292.56

C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 106,886.36
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 106,886.36
O.48 1 M Pasangan Ring praktis 15 x 20 cm
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.180 Rp 101,500.00 Rp 18,270.00
Tukang Batu OH 0.020 Rp 133,600.00 Rp 2,672.00
Tukang Kayu OH 0.020 Rp 140,800.00 Rp 2,816.00
Tukang Besi OH 0.020 Rp 125,000.00 Rp 2,500.00
Kepala Tukang OH 0.006 Rp 152,300.00 Rp 913.80
Mandor OH 0.009 Rp 158,000.00 Rp 1,422.00
JUMLAH TENAGA KERJA Rp 28,593.80
B. BAHAN
Kayu Kelas III m3 0.002 Rp 9,104,400.00 Rp 19,119.24
Paku Biasa 5cm - 12cm kg 0.012 Rp 18,000.00 Rp 216.00
Minyak bekisting Liter Rp - Rp -
Besi Beton polos kg 3.000 Rp 11,997.22 Rp 35,991.66
Kawat Beton kg 0.450 Rp 32,000.00 Rp 14,400.00
Semen Portland ( Gersik) kg 4.000 Rp 1,485.00 Rp 5,940.00
Pasir Beton m3 0.006 Rp 207,900.00 Rp 1,247.40
Koral Beton m3 0.009 Rp 258,300.00 Rp 2,324.70
JUMLAH HARGA BAHAN Rp 79,239.00

C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 107,832.80
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 107,832.80

O.49 Pemasangan 1 m2 atap Genteng Plentong


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.150 Rp 101,500.00 Rp 15,225.00
Tukang Kayu L.04 OH 0.075 Rp 140,800.00 Rp 10,560.00
Kepala Tukang L.05 OH 0.008 Rp 152,300.00 Rp 1,218.40
Mandor L.17 OH 0.008 Rp 158,000.00 Rp 1,264.00
JUMLAH TENAGA KERJA Rp 28,267.40
B. BAHAN
Genteng Goodyear bh 25.000 Rp 2,500.00 Rp 62,500.00
JUMLAH HARGA BAHAN Rp 62,500.00

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 90,767.40
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 90,767.40
O.50 Pemasangan 1 m' bubung Plentong
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.400 Rp 101,500.00 Rp 40,600.00
Tukang Kayu L.04 OH 0.200 Rp 140,800.00 Rp 28,160.00
Kepala Tukang L.05 OH 0.020 Rp 152,300.00 Rp 3,046.00
Mandor L.17 OH 0.002 Rp 158,000.00 Rp 316.00
JUMLAH TENAGA KERJA Rp 72,122.00
B. BAHAN
Genteng bubung Bh 5.000 Rp 8,000.00 Rp 40,000.00
Semen Portland Kg 8.000 Rp 1,485.00 Rp 11,880.00
Pasir Pasang M³ 0.032 Rp 207,900.00 Rp 6,652.80
JUMLAH HARGA BAHAN Rp 58,532.80

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 130,654.80
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 130,654.80

O.51
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.100 Rp 101,500.00 Rp 10,150.00
Tukang Kayu L.04 OH 0.200 Rp 140,800.00 Rp 28,160.00
Kepala Tukang L.05 OH 0.020 Rp 152,300.00 Rp 3,046.00
Mandor L.17 OH 0.005 Rp 158,000.00 Rp 790.00
JUMLAH TENAGA KERJA Rp 42,146.00
B. BAHAN
Papan kayu Kamper 3/20 M³ 0.011 Rp 8,535,600.00 Rp 92,184.48
Paku usuk Kg 0.100 Rp 18,900.00 Rp 1,890.00
JUMLAH HARGA BAHAN Rp 94,074.48

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 136,220.48
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 136,220.48
O.52 Pembuatan dan pemasangan 1 m² pintu dan jendela kaca, kayu Kruing
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.800 Rp 101,500.00 Rp 81,200.00
Tukang Kayu L.04 OH 2.400 Rp 140,800.00 Rp 337,920.00
Kepala Tukang L.05 OH 0.240 Rp 152,300.00 Rp 36,552.00
Mandor L.17 OH 0.040 Rp 158,000.00 Rp 6,320.00
JUMLAH TENAGA KERJA Rp 461,992.00
B. BAHAN
Papan kayu kamper M³ 0.024 Rp 9,104,400.00 Rp 218,505.60
Lem kayu Kg 0.300 Rp 34,200.00 Rp 10,260.00
JUMLAH HARGA BAHAN Rp 228,765.60

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 690,757.60
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 690,757.60

O.53 Pembuatan dan pemasangan 1 m Grill Besi


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.095 Rp 101,500.00 Rp 9,642.50
Tukang Las Konstruksi L.26 OH 0.095 Rp 114,200.00 Rp 10,849.00
Kepala Tukang L.27 OH 0.075 Rp 143,600.00 Rp 10,770.00
Mandor L.17 OH 0.008 Rp 158,000.00 Rp 1,185.00
JUMLAH TENAGA KERJA Rp 32,446.50
B. BAHAN
Besi Profil kg 5.171 Rp 18,900.00 Rp 97,730.39
Besi Siku 30 x 30 x 3 mm m 3.200 Rp 55,300.00 Rp 176,960.00
\ JUMLAH HARGA BAHAN Rp 274,690.39
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 307,136.89
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 307,136.89
O.54 Pemasangan 1 Set Pompa Booster
NO. URAIAN 123 SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Jasa Pemasangan lot 1.000 Rp 400,000.00 Rp 400,000.00
JUMLAH TENAGA KERJA Rp 400,000.00
B. BAHAN
Booster Pump Set 1.000 Rp 25,800,000.00 Rp 25,800,000.00

JUMLAH HARGA BAHAN Rp 25,800,000.00


C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 26,200,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 26,200,000.00

O.55 Pengurugan 1 m3 Dengan Pasir Malang


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.300 Rp 101,500.00 Rp 30,450.00
Mandor L.17 OH 0.010 Rp 158,000.00 Rp 1,580.00
JUMLAH TENAGA KERJA Rp 32,030.00
B. BAHAN
Pasir Malang m3 1.100 Rp 350,000.00 Rp 385,000.00
JUMLAH HARGA BAHAN Rp 385,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 417,030.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 417,030.00

O.56 Pekerjaan 1m2 Pembersihan Dan Pematangan Site


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.100 Rp 101,500.00 Rp 10,150.00
Mandor L.17 OH 0.010 Rp 158,000.00 Rp 1,580.00
JUMLAH TENAGA KERJA Rp 11,730.00
B. BAHAN
JUMLAH HARGA BAHAN Rp -
C. PERALATAN
Theodolit ls 1.000 Rp 10,000.00 Rp 10,000.00
JUMLAH HARGA ALAT Rp 10,000.00

D. Jumlah (A + B + C) Rp 21,730.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 21,730.00
O.57 Pekerjaan 1 unit Patung Bungkarno Perunggu
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
JUMLAH TENAGA KERJA
B. BAHAN
Patung Bungkarno Perunggu ls 1.000 Rp 800,000,000.00 Rp 800,000,000.00
JUMLAH HARGA BAHAN Rp 800,000,000.00
C. PERALATAN
Mobilisassi ls 1.000 Rp 48,000,000.00 Rp 48,000,000.00
JUMLAH HARGA ALAT Rp 48,000,000.00

D. Jumlah (A + B + C) Rp 848,000,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 848,000,000.00

O.58 Pekerjaan 1 m2 Pemasangan Batu Palimanan


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.500 Rp 101,500.00 Rp 50,750.00
Tukang Batu L.02 OH 1.015 Rp 133,600.00 Rp 135,604.00
Kepala Tukang L.03 OH 0.050 Rp 147,900.00 Rp 7,395.00
Mandor L.17 OH 0.050 Rp 158,000.00 Rp 7,900.00
JUMLAH TENAGA KERJA Rp 201,649.00
B. BAHAN
Batu Palimanan m2 1.100 Rp 154,250.00 Rp 169,675.00
Semen Portland kg 10.0400 Rp 1,485.00 Rp 14,909.40
Pasir Pasang m3 0.045 Rp 207,900.00 Rp 9,355.50
JUMLAH HARGA BAHAN Rp 193,939.90
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 395,588.90
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 395,588.90
O.59 Pengecatan 1 M² Cat Tembaga
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.020 Rp 101,500.00 Rp 2,030.00
Tukang cat L.06 OH 0.063 Rp 112,000.00 Rp 7,056.00
Kepala tukang L.07 OH 0.006 Rp 123,500.00 Rp 778.05
Mandor L.17 OH 0.003 Rp 158,000.00 Rp 474.00
JUMLAH TENAGA KERJA Rp 10,338.05
B. BAHAN
Cat Tembaga Kg 0.200 Rp 110,000.00 Rp 22,000.00
Amplas lbr 5.000 Rp 6,300.00 Rp 31,500.00
JUMLAH HARGA BAHAN Rp 53,500.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 63,838.05
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 63,838.05

O.60 Pekerjaan 1 m2 Coating Natural


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.050 Rp 101,500.00 Rp 5,075.00
Tukang cat L.06 OH 0.063 Rp 112,000.00 Rp 7,056.00
Kepala tukang L.07 OH 0.006 Rp 123,500.00 Rp 778.05
Mandor L.17 OH 0.003 Rp 158,000.00 Rp 474.00
JUMLAH TENAGA KERJA Rp 13,383.05
B. BAHAN
Coating Natural ltr 0.200 Rp 85,000.00 Rp 17,000.00
JUMLAH HARGA BAHAN Rp 17,000.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 30,383.05
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 30,383.05

O.61 Pekerjaan 1m3 Pembongkaran Beton


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 1.900 Rp 101,500.00 Rp 192,850.00
Mandor L.17 OH 0.090 Rp 158,000.00 Rp 14,220.00
JUMLAH TENAGA KERJA Rp 207,070.00
B. BAHAN
JUMLAH HARGA BAHAN Rp -
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 207,070.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 207,070.00
O.62 Pekerjaan 1 m2 Pemasangan Ukiran mill
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.140 Rp 101,500.00 Rp 14,210.00
Tukang Ukir OH 1.015 Rp 1,500,000.00 Rp 1,522,500.00
Kepala Tukang OH 0.100 Rp 147,900.00 Rp 14,790.00
Mandor OH 0.100 Rp 158,000.00 Rp 15,800.00
JUMLAH TENAGA KERJA Rp 1,567,300.00
B. BAHAN
Mill kg 110.040 Rp 1,200.00 Rp 132,048.00
Semen Portland kg 110.040 Rp 1,485.00 Rp 163,409.40
Prada kg 3.000 Rp 570,000.00 Rp 1,710,000.00
Besi d10 kg 80.0000 Rp 11,997.22 Rp 959,777.60
JUMLAH HARGA BAHAN Rp 2,965,235.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 4,532,535.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 4,532,535.00

O.63 Pekerjaan 1 unit aling aling tinggi 3 m


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.500 Rp 101,500.00 Rp 50,750.00
Mandor L.17 OH 0.050 Rp 158,000.00 Rp 7,900.00
JUMLAH TENAGA KERJA Rp 58,650.00
B. BAHAN
Aling aling ukir koombinasi palimanan & batu candi unit 1.000 Rp 18,000,000.00 Rp 18,000,000.00
Beton Pengeresek m3 6.0400 Rp 907,336.41 Rp 5,480,311.94
JUMLAH HARGA BAHAN Rp 23,480,311.94
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 23,538,961.94
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 23,538,961.94
O.64 Pekerjaan 1 unit Candi Bentar t 4 m
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 17.500 Rp 101,500.00 Rp 1,776,250.00
Tukang batu OH 17.500 Rp 147,900.00 Rp 2,588,250.00
Mandor OH 5.350 Rp 158,000.00 Rp 845,300.00
JUMLAH TENAGA KERJA Rp 5,209,800.00
B. BAHAN
candi bentar Paras sangsit unit 1.000 Rp 40,000,000.00 Rp 40,000,000.00
Beton Pengeresek m3 5.0400 Rp 646,944.90 Rp 3,260,602.30
JUMLAH HARGA BAHAN Rp 43,260,602.30
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 48,470,402.30
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 48,470,402.30

O.65 Pekerjaan 1 m partisi portable


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.500 Rp 101,500.00 Rp 50,750.00
Tukang Kayu OH 0.500 Rp 152,300.00 Rp 76,150.00
Tukang besi OH 0.500 Rp 143,600.00 Rp 71,800.00
Mandor OH 0.050 Rp 158,000.00 Rp 7,900.00
JUMLAH TENAGA KERJA Rp 206,600.00
B. BAHAN
Besi Hollow 4 x 4 m 6.600 Rp 40,000.00 Rp 264,000.00
Papan Kayu m2 0.042 Rp 11,380,500.00 Rp 477,981.00
JUMLAH HARGA BAHAN Rp 741,981.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 948,581.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 948,581.00
O.66 Pekerjaan 1 bh Ikut Celedu Paras P 50cm
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.500 Rp 101,500.00 Rp 50,750.00
Mandor OH 0.050 Rp 158,000.00 Rp 7,900.00
JUMLAH TENAGA KERJA Rp 58,650.00
B. BAHAN
Ikut Celedu Paras P 50cm bh 1.000 Rp 110,000.00 Rp 110,000.00
Semen Portland kg 0.042 Rp 1,485.00 Rp 62.37
JUMLAH HARGA BAHAN Rp 110,062.37
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 168,712.37
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 168,712.37

O.67 Pekerjaan 1 bh Murda Paras 30 x 30 cm


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.500 Rp 101,500.00 Rp 50,750.00
Mandor OH 0.050 Rp 158,000.00 Rp 7,900.00
JUMLAH TENAGA KERJA Rp 58,650.00
B. BAHAN
Murda Paras 30 x 30 cm bh 1.000 Rp 220,000.00 Rp 220,000.00
Semen Portland kg 0.042 Rp 1,485.00 Rp 62.37
JUMLAH HARGA BAHAN Rp 220,062.37
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 278,712.37
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 278,712.37

O.68 Pekerjaan 1 unit Septitank dan Resapan


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.900 Rp 101,500.00 Rp 91,350.00
Tukang Besi OH 0.900 Rp 125,000.00 Rp 112,500.00
Tukang Batu OH 0.900 Rp 133,600.00 Rp 120,240.00
Tukang Kayu OH 0.900 Rp 140,800.00 Rp 126,720.00
Mandor OH 0.090 Rp 158,000.00 Rp 14,220.00
JUMLAH TENAGA KERJA Rp 465,030.00
B. BAHAN
Besi d 10 kg 98.000 Rp 11,997.22 Rp 1,175,727.56
Beton k 175 m3 1.500 Rp 1,014,345.06 Rp 1,521,517.59
Batako m2 9.300 Rp 97,689.80 Rp 908,515.14
JUMLAH HARGA BAHAN Rp 3,605,760.29
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 4,070,790.29
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 4,070,790.29
O.69 1m3 Pekerjaan usuk di profil 4 x 6 cm
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.900 Rp 101,500.00 Rp 91,350.00
Tukang Kayu OH 0.900 Rp 140,800.00 Rp 126,720.00
Mandor OH 0.090 Rp 158,000.00 Rp 14,220.00
JUMLAH TENAGA KERJA Rp 232,290.00
B. BAHAN
Usuk 4/ 6 profil m3 0.700 Rp 10,413,000.00 Rp 7,289,100.00

JUMLAH HARGA BAHAN Rp 7,289,100.00


C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 7,521,390.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 7,521,390.00

O.70 1m3 Pekerjaan papan profil


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.900 Rp 101,500.00 Rp 91,350.00
Tukang Kayu OH 0.900 Rp 140,800.00 Rp 126,720.00
Mandor OH 0.090 Rp 158,000.00 Rp 14,220.00
JUMLAH TENAGA KERJA Rp 232,290.00
B. BAHAN
papan kayu 3 x 20 cm m3 0.900 Rp 11,380,500.00 Rp 10,242,450.00

JUMLAH HARGA BAHAN Rp 10,242,450.00


C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 10,474,740.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 10,474,740.00
O.71 1m2 Pekerjaan Lambrizering
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.400 Rp 101,500.00 Rp 40,600.00
Tukang Kayu OH 0.900 Rp 140,800.00 Rp 126,720.00
Mandor OH 0.090 Rp 158,000.00 Rp 14,220.00
JUMLAH TENAGA KERJA Rp 181,540.00
B. BAHAN
papan Labrizering kamper m3 0.022 Rp 11,380,500.00 Rp 250,371.00

JUMLAH HARGA BAHAN Rp 250,371.00


C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 431,911.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 431,911.00

O.72 1m Pekerjaan jaro ukir


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.400 Rp 101,500.00 Rp 40,600.00
Tukang Kayu OH 0.500 Rp 140,800.00 Rp 70,400.00
Tukang Ukir OH 1.000 Rp 100,000.00 Rp 100,000.00
Mandor OH 0.090 Rp 158,000.00 Rp 14,220.00
JUMLAH TENAGA KERJA Rp 225,220.00
B. BAHAN
papan kayu di ukir m3 0.080 Rp 16,388,100.00 Rp 1,311,048.00
Prada dan cat kg 0.450 Rp 570,000.00 Rp 256,500.00

JUMLAH HARGA BAHAN Rp 1,567,548.00


C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 1,792,768.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 1,792,768.00

O.72a 1bh Pekerjaan tiang jaro ukir


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.400 Rp 101,500.00 Rp 40,600.00
Tukang Kayu OH 0.500 Rp 140,800.00 Rp 70,400.00
Tukang Ukir OH 1.000 Rp 75,000.00 Rp 75,000.00
Mandor OH 0.090 Rp 158,000.00 Rp 14,220.00
JUMLAH TENAGA KERJA Rp 200,220.00
B. BAHAN
papan kayu di ukir m3 0.006 Rp 16,388,100.00 Rp 104,883.84
Prada dan cat kg 0.090 Rp 570,000.00 Rp 51,300.00

JUMLAH HARGA BAHAN Rp 156,183.84


C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 356,403.84
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 356,403.84
O.73 Pekerjaan 1 m2 Pemasangan Tempelan granit
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.500 Rp 101,500.00 Rp 50,750.00
Tukang Batu L.02 OH 1.015 Rp 133,600.00 Rp 135,604.00
Kepala Tukang L.03 OH 0.050 Rp 147,900.00 Rp 7,395.00
Mandor L.17 OH 0.050 Rp 158,000.00 Rp 7,900.00
JUMLAH TENAGA KERJA Rp 201,649.00
B. BAHAN
Granit hitam t 10 mm m2 1.100 Rp 463,000.00 Rp 509,300.00
Semen Portland kg 10.0400 Rp 1,485.00 Rp 14,909.40
Pasir Pasang m3 0.045 Rp 207,900.00 Rp 9,355.50
JUMLAH HARGA BAHAN Rp 533,564.90
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 735,213.90
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 735,213.90

O.74 Pekerjaan 1 m Pagar Rantai stainlees


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.500 Rp 101,500.00 Rp 50,750.00
Tukang Kayu OH 0.500 Rp 79,200.00 Rp 39,600.00
Tukang besi OH 0.500 Rp 189,900.00 Rp 94,950.00
Mandor OH 0.050 Rp 158,000.00 Rp 7,900.00
JUMLAH TENAGA KERJA Rp 193,200.00
B. BAHAN
Pipa galvanis stainless 6 mm m 2.300 Rp 40,000.00 Rp 92,000.00
Rantai stainleess m 1.200 Rp 87,000.00 Rp 104,400.00
JUMLAH HARGA BAHAN Rp 196,400.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 389,600.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 389,600.00
O.75 1 Set Pekerjaan Output pintu masuk / Petunjuk pintu masuk
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.500 Rp 101,500.00 Rp 50,750.00
Tukang Kayu OH 0.500 Rp 26,100.00 Rp 13,050.00
Tukang besi OH 0.500 Rp 77,400.00 Rp 38,700.00
Mandor OH 0.050 Rp 158,000.00 Rp 7,900.00
JUMLAH TENAGA KERJA Rp 110,400.00
B. BAHAN
Besi hollow 4 x 4 cm m 18.75 47000 Rp 881,250.00
Baner 3 x 0,8 m bh 2.00 256000 Rp 512,000.00
In Portable acrilic + frame 80 x 80 cm bh 2.000 Rp 950,000.00 Rp 1,900,000.00
Out Portable acrilic + frame 80 x 80 cm bh 2.000 Rp 950,000.00 Rp 1,900,000.00
JUMLAH HARGA BAHAN Rp 5,193,250.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 5,303,650.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 5,303,650.00

O.76 Penggalian 1 Titik Lubang Biopori


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.034 Rp 101,500.00 Rp 3,420.00
Mandor L.17 OH 0.010 Rp 158,000.00 Rp 1,580.00
JUMLAH TENAGA KERJA Rp 5,000.00
B. BAHAN

JUMLAH HARGA BAHAN Rp -


C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 5,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 5,000.00

O.77 Pemasangan 1 Box MCB


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.100 Rp 101,500.00 Rp 10,150.00
Tukang Listrik OH 0.300 Rp 120,600.00 Rp 36,180.00
Kepala Tukang OH 0.290 Rp 132,100.00 Rp 38,309.00
Mandor OH 0.100 Rp 158,000.00 Rp 15,800.00
JUMLAH TENAGA KERJA Rp 100,439.00
B. BAHAN
Mox Panel MCB Schneider Unit 1.000 Rp 650,000.00 Rp 650,000.00
JUMLAH HARGA BAHAN Rp 650,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 750,439.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 750,439.00
O.78 Pengadaan Pemasangan Lampu Lalu Lintas
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.100 Rp 101,500.00 Rp 10,150.00
Tukang Listrik OH 0.300 Rp 120,600.00 Rp 36,180.00
Kepala Tukang OH 0.290 Rp 132,100.00 Rp 38,309.00
Mandor OH 0.100 Rp 158,000.00 Rp 15,800.00
JUMLAH TENAGA KERJA Rp 100,439.00
B. BAHAN
Lampu Lalu Lintas Unit 1.000 Rp 3,500,000.00 Rp 3,500,000.00
JUMLAH HARGA BAHAN Rp 3,500,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 3,600,439.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 3,600,439.00

O.79 Pemasangan 1 Bh Tangga Monyet


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Jasa Pemasangan Ls 1.000 Rp 50,000.00 Rp 50,000.00
JUMLAH TENAGA KERJA Rp 50,000.00
B. BAHAN
Tangga Monyet Unit 1.000 Rp 800,000.00 Rp 800,000.00
JUMLAH HARGA BAHAN Rp 800,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 850,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 850,000.00

O.80 Pemasangan 1 Bh Tutup Manhole


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Jasa Pemasangan Ls 1.000 Rp 50,000.00 Rp 50,000.00
JUMLAH TENAGA KERJA Rp 50,000.00
B. BAHAN
Tutup Manhole Plat Strip Tebal 6 mm Unit 1.000 Rp 1,200,000.00 Rp 1,200,000.00
JUMLAH HARGA BAHAN Rp 1,200,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 1,250,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 1,250,000.00
O.81 Pekerjaan 1 Titik Pengelasan Konstruksi
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.210 Rp 101,500.00 Rp 21,315.00
Tukang Las Konstruktsi OH 0.210 Rp 120,600.00 Rp 25,326.00
JUMLAH TENAGA KERJA Rp 46,641.00
B. BAHAN

JUMLAH HARGA BAHAN Rp -


C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 46,641.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 46,641.00

O.82 Pemasangan 1 Bh Relief Nomor 5,7,8,11,13,14,15 dan 17


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Jasa Pemasangan Ls 1.000 Rp 500,000.00 Rp 500,000.00
JUMLAH TENAGA KERJA Rp 500,000.00
B. BAHAN
Relief Nomor 5,7,8,11,13,14,15 dan 17 Unit 1.000 Rp 41,000,000.00 Rp 41,000,000.00
JUMLAH HARGA BAHAN Rp 41,000,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 41,500,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 41,500,000.00

O.83 Pemasangan 1 Bh Relief Nomor 1,2 dan 3


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Jasa Pemasangan Ls 1.000 Rp 700,000.00 Rp 700,000.00
JUMLAH TENAGA KERJA Rp 700,000.00
B. BAHAN
Relief Nomor 5,7,8,11,13,14,15 dan 17 Unit 1.000 Rp 71,500,000.00 Rp 71,500,000.00
JUMLAH HARGA BAHAN Rp 71,500,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 72,200,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 72,200,000.00
O.84 Pemasangan 1 Bh Baut Angker D10
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Jasa Pemasangan Ls 1.000 Rp 1,000.00 Rp 1,000.00
JUMLAH TENAGA KERJA Rp 1,000.00
B. BAHAN
Baut Angker D10 Unit 1.000 Rp 20,000.00 Rp 20,000.00
JUMLAH HARGA BAHAN Rp 20,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 21,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 21,000.00

O.85 Pemasangan 1 Unit Patung Singa Ambara Raja


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Jasa Pemasangan Ls 1.000 Rp 33,000,000.00 Rp 33,000,000.00
JUMLAH TENAGA KERJA Rp 33,000,000.00
B. BAHAN
Lanjutan Patung Singa Ambara Raja Unit 1.000 Rp 1,000,000,000.00 Rp 1,000,000,000.00
JUMLAH HARGA BAHAN Rp 1,000,000,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 1,033,000,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 1,033,000,000.00

O.86 Pemasangan 1 Unit Pintu Gerbang Lipat


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Jasa Pemasangan Ls 1.000 Rp 500,000.00 Rp 500,000.00
JUMLAH TENAGA KERJA Rp 500,000.00
B. BAHAN
Pintu Gerbang Lipat Unit 1.000 Rp 13,500,000.00 Rp 13,500,000.00
JUMLAH HARGA BAHAN Rp 13,500,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 14,000,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 14,000,000.00
O.87 Pemasangan 1 Unit Pintu Gerbang Sliding
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Jasa Pemasangan Ls 1.000 Rp 500,000.00 Rp 500,000.00
JUMLAH TENAGA KERJA Rp 500,000.00
B. BAHAN
Pintu Gerbang Sliding Unit 1.000 Rp 8,500,000.00 Rp 8,500,000.00
JUMLAH HARGA BAHAN Rp 8,500,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 9,000,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 9,000,000.00

O.88 Pemasangan 1 m2 Rangka kanopi holoow 4 x 4 cm


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Jasa Pemasangan Ls 1.000 Rp 34,000.00 Rp 34,000.00
JUMLAH TENAGA KERJA Rp 34,000.00
B. BAHAN
Rangka kanopi holoow 4 x 4 cm m2 1.000 Rp 100,000.00 Rp 100,000.00
JUMLAH HARGA BAHAN Rp 100,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 134,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 134,000.00

O.89 Pemasangan 1 m2 Atap Kanopi Spandek


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Jasa Pemasangan Ls 1.000 Rp 75,000.00 Rp 75,000.00
JUMLAH TENAGA KERJA Rp 75,000.00
B. BAHAN
Atap Kanopi Spandek m2 1.000 Rp 150,000.00 Rp 150,000.00
JUMLAH HARGA BAHAN Rp 150,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 225,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 225,000.00
O.90 Pemasangan 1 Set Patung Bung Karno dan Sungkem Tembaga
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Jasa Pemasangan Ls 1.000 Rp 20,000,000.00 Rp 20,000,000.00
JUMLAH TENAGA KERJA Rp 20,000,000.00
B. BAHAN
Patung Bung Karno dan Sungkem Tembaga Unit 1.000 Rp 200,000,000.00 Rp 200,000,000.00
JUMLAH HARGA BAHAN Rp 200,000,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 220,000,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 220,000,000.00

O.91 Pemasangan 1 Bh Dedeleg


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Jasa Pemasangan Ls 1.000 Rp 150,000.00 Rp 150,000.00
JUMLAH TENAGA KERJA Rp 150,000.00
B. BAHAN
Dedeleg Bh 1.000 Rp 3,250,000.00 Rp 3,250,000.00
JUMLAH HARGA BAHAN Rp 3,250,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 3,400,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 3,400,000.00

O.92 Pengadaan 1 Paket Burung Jalak Bali + Sertifikat BKSDA


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Rp -
JUMLAH TENAGA KERJA Rp -
B. BAHAN
Burung Jalak Bali + Sertifikat BKSDA Paket 1.000 Rp 9,800,000.00 Rp 9,800,000.00
JUMLAH HARGA BAHAN Rp 9,800,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 9,800,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 9,800,000.00
O.93 Pemasangan 1 m' Water Stop PVC Sika Waterbar V20
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja OH 0.070 Rp 101,500.00 Rp 7,105.00
Tukang OH 0.035 Rp 133,600.00 Rp 4,676.00
Kepala Tukang OH 0.004 Rp 147,900.00 Rp 517.65
Mandor OH 0.007 Rp 158,000.00 Rp 1,106.00
JUMLAH TENAGA KERJA Rp 13,404.65
B. BAHAN
Water Stop PVC Sika Waterbar V20 m1 1.050 Rp 99,000.00 Rp 103,950.00
Kawat Beton kg 0.010 Rp 25,200.00 Rp 252.00
JUMLAH HARGA BAHAN Rp 104,202.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 117,606.65
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 117,606.65

O.94 Pengadaan 1 Paket Tempat minum dan Makan Burung


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Rp -
JUMLAH TENAGA KERJA Rp -
B. BAHAN
Tempat minum dan Makan Burung Paket 1.000 Rp 50,000.00 Rp 50,000.00
JUMLAH HARGA BAHAN Rp 50,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 50,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 50,000.00

O.95 Pengadaan 1 Paket Gelodok Besar


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Rp -
JUMLAH TENAGA KERJA Rp -
B. BAHAN
Tempat minum dan Makan Burung Paket 1.000 Rp 150,000.00 Rp 150,000.00
JUMLAH HARGA BAHAN Rp 150,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 150,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 150,000.00
O.96 Pemasangan 1 m2 Rangka Dinding Pipa Galvanis
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Jasa Pemasangan Ls 1.000 Rp 35,000.00 Rp 35,000.00
JUMLAH TENAGA KERJA Rp 35,000.00
B. BAHAN
Rangka Dinding Pipa Galvanis m2 1.000 Rp 100,000.00 Rp 100,000.00
JUMLAH HARGA BAHAN Rp 100,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 135,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 135,000.00

O.97 Pemasangan 1 m2 Atap Metal Berpasir


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Jasa Pemasangan Ls 1.000 Rp 75,000.00 Rp 75,000.00
JUMLAH TENAGA KERJA Rp 75,000.00
B. BAHAN
Atap Metal Berpasir m2 1.000 Rp 155,000.00 Rp 155,000.00
JUMLAH HARGA BAHAN Rp 155,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 230,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 230,000.00

O.98 Pemasangan 1 m2 Dinding Kawat Jaring


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Jasa Pemasangan Ls 1.000 Rp 35,000.00 Rp 35,000.00
JUMLAH TENAGA KERJA Rp 35,000.00
B. BAHAN
Dinding Kawat Jaring m2 1.000 Rp 70,000.00 Rp 70,000.00
JUMLAH HARGA BAHAN Rp 70,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 105,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 105,000.00
O.99 Pengadaan dan Pemasangan 1 bh Rambu Lalu Lintas
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Jasa Pemasangan Ls 1.000 Rp 50,000.00 Rp 50,000.00
JUMLAH TENAGA KERJA Rp 50,000.00
B. BAHAN
Rambu Lalu Lintas bh 1.000 Rp 650,000.00 Rp 650,000.00
JUMLAH HARGA BAHAN Rp 650,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 700,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 700,000.00

O.100 Pekerjaan 1 m2 Marka Jalan Thermoplaastik


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Ongkos Kerja Ls 1.000 Rp 60,000.00 Rp 60,000.00
JUMLAH TENAGA KERJA Rp 60,000.00
B. BAHAN
Marka Jalan Thermoplaastik m2 1.000 Rp 110,000.00 Rp 110,000.00
JUMLAH HARGA BAHAN Rp 110,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 170,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 170,000.00

O.101 Pemasangan 1 bh Roster Keramik 30x30 cm


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Ongkos Kerja Ls 1.000 Rp 20,000.00 Rp 20,000.00
JUMLAH TENAGA KERJA Rp 20,000.00
B. BAHAN
Roster Keramik 30x30 cm bh 1.000 Rp 80,000.00 Rp 80,000.00
JUMLAH HARGA BAHAN Rp 80,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 100,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 100,000.00
O.102 Pemasangan 1 bh Roster Paras Ukir 25x25 cm
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Ongkos Kerja Ls 1.000 Rp 15,000.00 Rp 15,000.00
JUMLAH TENAGA KERJA Rp 15,000.00
B. BAHAN
Roster Paras Ukir 25x25 cm bh 1.000 Rp 50,000.00 Rp 50,000.00
JUMLAH HARGA BAHAN Rp 50,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 65,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 65,000.00

O.103 Pekerjaan 1 Buah Door Closer


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.015 Rp 101,500.00 Rp 1,522.50
Tukang Besi L.08 OH 0.150 Rp 125,000.00 Rp 18,750.00
Kepala Tukang L.09 OH 0.015 Rp 143,600.00 Rp 2,154.00
Mandor L.17 OH 0.001 Rp 158,000.00 Rp 126.40
JUMLAH TENAGA KERJA Rp 22,552.90
B. BAHAN
Door Closer bh 1.000 Rp 222,500.00 Rp 222,500.00

JUMLAH HARGA BAHAN Rp 222,500.00


C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 245,052.90
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 245,052.90

O.104 Pengadaan dan Pemasangan 1 bh Foto (74x54 cm) + Frame Bingkai


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Jasa Pemasangan Ls 1.000 Rp 20,000.00 Rp 20,000.00
JUMLAH TENAGA KERJA Rp 20,000.00
B. BAHAN
Foto (74x54 cm) + Frame Bingkai bh 1.000 Rp 500,000.00 Rp 500,000.00
JUMLAH HARGA BAHAN Rp 500,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 520,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 520,000.00
O.105 Pengadaan dan Pemasangan 1 bh Bale Bengong 200 x 200 cm
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Jasa Pemasangan Ls 1.000 Rp 1,000,000.00 Rp 1,000,000.00
JUMLAH TENAGA KERJA Rp 1,000,000.00
B. BAHAN
Bale Bengong 200 x 200 cm bh 1.000 Rp 16,000,000.00 Rp 16,000,000.00
JUMLAH HARGA BAHAN Rp 16,000,000.00
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 17,000,000.00
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 17,000,000.00

O.106 Pekerjaan 1 m2 Pemasangan Batu andesit Bakar


NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.500 Rp 101,500.00 Rp 50,750.00
Tukang Batu L.02 OH 0.915 Rp 133,600.00 Rp 122,244.00
Kepala Tukang L.03 OH 0.050 Rp 147,900.00 Rp 7,395.00
Mandor L.17 OH 0.050 Rp 158,000.00 Rp 7,900.00
JUMLAH TENAGA KERJA Rp 188,289.00
B. BAHAN
Batu Batu andesit Bakar t 1,3 cm m2 1.100 Rp 155,000.00 Rp 170,500.00
Semen Portland kg 10.0400 Rp 1,485.00 Rp 14,909.40
Pasir Pasang m3 0.045 Rp 207,900.00 Rp 9,355.50
JUMLAH HARGA BAHAN Rp 194,764.90
C. PERALATAN Rp -
JUMLAH HARGA ALAT Rp -

D. Jumlah (A + B + C) Rp 383,053.90
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 383,053.90

O.107 Pemasangan 1 m² langit-langit gypsum board ukuran (120 x 240 x 9) dengan rangka hollow
NO. URAIAN KODE SATUAN KOEFISIEN HARGA SAT. JML. HARGA
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.500 Rp 101,500.00 Rp 50,750.00
Tukang Kayu L.04 OH 0.200 Rp 140,800.00 Rp 28,160.00
Kepala Tukang L.05 OH 0.020 Rp 152,300.00 Rp 3,046.00
Mandor L.17 OH 0.025 Rp 158,000.00 Rp 3,950.00
JUMLAH TENAGA KERJA Rp 85,906.00
B. BAHAN
Gypsum Lembar 0.380 Rp 79,200.00 Rp 30,096.00
Rangka Hollow m1 5.500 Rp 29,000.00 Rp 159,500.00
Paku Skrup kg 0.022 Rp 24,300.00 Rp 534.60
JUMLAH HARGA BAHAN Rp 190,130.60

C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) Rp 276,036.60
E. Overhead & Profit 0% x D Rp -
F. Harga Satuan Pekerjaan (D+E) Rp 276,036.60
DAFTAR HARGA SATUAN BAHAN DAN UPAH 2020

NO URAIAN SATUAN HARGA SATUAN Keterangan


1 2 3 4 5
A UPAH
1 Pekerja OH Rp 101,500.00
2 Mandor OH Rp 158,000.00
3 Kepala Tukang Kayu OH Rp 152,300.00
4 Kepala Tukang Batu OH Rp 147,900.00
5 Kepala Tukang Besi OH Rp 143,600.00
6 Kepala Tukang Cat OH Rp 123,500.00
7 Kepala Tukang Style Bali OH Rp 152,300.00
8 Kepala Tukang Pipa OH Rp 132,100.00
9 Kepala Tukang Listrik OH Rp 132,100.00
10 Kepala Tukang Paras OH Rp 146,500.00
11 Tukang Kayu OH Rp 140,800.00
12 Tukang Batu OH Rp 133,600.00
13 Tukang Besi OH Rp 125,000.00
14 Tukang Cat OH Rp 112,000.00
15 Tukang Politur OH Rp 117,800.00
16 Tukang Style Bali OH Rp 143,600.00
17 Tukang Pipa OH Rp 120,600.00
18 Tukang Listrik OH Rp 120,600.00
19 Tukang Gali OH Rp 106,300.00
20 Tukang Ukir Kayu OH Rp 146,500.00
21 Tukang Ukir Paras OH Rp 140,800.00
22 Tukang masak aspal OH Rp 117,800.00
23 Tukang Bangunan OH Rp 114,900.00
24 Pengayah Tukang Bangunan OH Rp 91,900.00
25 Masinis OH Rp 201,100.00
26 Kernet OH Rp 172,400.00
27 Sopir OH Rp 155,100.00
28 Tukang Style Bali Rp 87,500.00
29 - Atap Alang-Alang Hr Rp 140,000.00
30 - Bata Gosok Dua Muka m2 Rp 155,000.00
31 - Batu Paras Diukir m2 Rp 146,500.00
32 - Batu Paras Siap Diukir m2 Rp 112,000.00

B BAHAN PASANGAN
1 Batu Pecah Besar m3 Rp 253,800.00
2 Batu Pecah 5 - 7 cm m3 Rp 290,700.00
3 Batu Pecah 2 - 3 cm m3 Rp 290,700.00
4 Batu Pecah 3 - 4 / 3-5 cm m3 Rp 290,700.00
5 Batu Pecah 1 - 2 cm m3 Rp 298,800.00
6 Batu Pecah 10-15 cm m3 Rp 253,800.00
7 Batu Pecah 0,5 - 1 cm m3 Rp 313,200.00
8 Batu Seplit Halus ( 0,5 - 1 ) cm m3 Rp 369,900.00
9 Batu Seplit Jagung (1 - 2) cm/ kasar m3 Rp 359,100.00
10 Pasir Batu (Sirtu) m3 Rp 199,800.00
11 Batu 5-7 cm m3 Rp 285,300.00
12 Batu 2-3 cm m3 Rp 285,300.00
13 Batu 3-5 cm m3 Rp 285,300.00
14 Batu 0,5-1 cm m3 Rp 302,400.00
15 Batu 1-2 cm m3 Rp 302,400.00
NO URAIAN SATUAN HARGA SATUAN Keterangan
1 2 3 4 5
16 Batu Kali m3 Rp 252,000.00
17 Batu Besar W 50 Kg m3 Rp 455,400.00
18 Batu Besar W 500 Kg m3 Rp 484,200.00
19 Batu Besar W 1000 Kg m3 Rp 540,900.00
20 Batu Besar 15/ 20 m3 Rp 256,500.00

C KERIKIL (KORAL)
1 Kerikil Biasa/ timbun m3 Rp 227,700.00
2 Kerikil Beton m3 Rp 258,300.00
3 Kerikil Halus m3 Rp 164,600.00
4 Kerikil Sungai (tidak disaring) m3 Rp 227,700.00

D PASIR
1 Pasir Urug m3 Rp 152,100.00
2 Pasir Beton m3 Rp 206,100.00
3 Pasir Pasang m3 Rp 207,900.00
4 Pasir Melela m3 Rp 2,133,000.00

E TANAH
1 Tanah Urug m3 Rp 81,900.00

F BATU BATA
1 Bata Gosok klas I bj Rp 5,400.00
2 Bata Gosok klas II bj Rp 4,500.00
3 Bata Pasang klas I bj Rp 1,700.00
4 Bata Pasang klas II bj Rp 1,200.00
5 Batu Lahar Merah Singaraja m3 Rp 215,100.00
6 Batu Pipih Singaraja m3 Rp 1,025,100.00
7 Loster Terawang PC bj Rp 17,100.00
8 Roster Terawang Keramik 30 x 30 bj Rp 91,800.00

G PARAS/PADAS
1 Paras Malam 50 x 20 x 12 cm bj Rp 44,100.00
2 Paras Ukir Selekarang 30x15x3cm bj Rp 10,800.00

H PORTLAND CEMENT
1 Semen Gresik ( 40 kg ) zak Rp 59,400.00
2 Semen Tiga Roda (50 kg) zak Rp 71,100.00
3 Semen Bosowa (50 kg) zak Rp 71,100.00
4 Semen Tiga Roda Putih (40 kg) zak Rp 152,100.00
5 Semen Warna kg Rp 21,600.00

I BAHAN ATAP
1 Genteng Biasa bj Rp 2,700.00
2 Bubungan Genteng Biasa bj Rp 5,400.00
3 Genteng Kecil bj Rp 6,300.00
4 Bubungan Genteng Kecil bj Rp 4,500.00
5 Genteng Kodok Nglayur bj Rp 3,600.00
6 Bubungan Genteng Kodok bj Rp 11,700.00
7 Genteng Plentong Press Jawa bj Rp 2,700.00
8 Bubungan Genteng Plentong bj Rp 9,000.00
9 Genteng Goodyear bj Rp 4,600.00
NO URAIAN SATUAN HARGA SATUAN Keterangan
1 2 3 4 5
10 Bubungan Goodyear bj Rp 29,700.00
11 Genteng Kaca 3 mm bj Rp 18,900.00
12 Ijuk Kg Rp 37,800.00
13 Alang - Alang Lbr Rp 37,800.00
14 Tali Pengikat Gulung Rp 20,700.00
15 Zincalume / Spandeck 0,25 mm m2 Rp 72,900.00
16 Zincalume Trimdeck 0,25 mm m2 Rp 67,500.00
17 Reng Zincalume (6m) btg Rp 51,300.00
18 Rangka Atap Baja Ringan Profil C 0,75 x 0,75 (6m) btg Rp 99,900.00
19 Rangka Atap Baja Ringan Profil C 0,65 (6m) btg Rp 76,500.00
20 Rangka Atap Baja Ringan Profil UK 0,75 x 0,75 (6m) btg Rp 153,900.00
21 Rangka Atap Baja Ringan Profil UK 0,65 (6m) btg Rp 160,200.00

J SENG
1 Gelombang BJLS 0,18 mm lbr Rp 48,600.00
2 Gelombang BJLS 0,20 mm lbr Rp 57,600.00
3 Seng Talang 30 cm m Rp 15,300.00

K ASBES PC (DJABESMEN)
1 Asbes Gel. 1,8 m` x 1,05 m`/4 mm lbr Rp 40,500.00

L BAHAN KAYU
1 Kayu Jati Papan m3 Rp 16,388,100.00
2 Kayu Jati Balok m3 Rp 13,941,000.00
3 Kayu Jati Bali Papan m3 Rp 14,083,200.00
4 Kayu Jati Bali Balok m3 Rp 11,664,900.00
5 Kayu Kamper Papan 3/20 m3 Rp 11,380,500.00
6 Kayu Kamper Balok 8/12 m3 Rp 10,669,500.00
7 Kayu Kamper Balok 6/12 m3 Rp 10,385,100.00
8 Kayu Kamper Usuk 4/6 m3 Rp 10,413,000.00
9 Kayu Kamper Usuk 5/7 m3 Rp 10,166,400.00
10 Kayu Kamper Reng m3 Rp 10,053,000.00
11 Kayu Meranti Papan m3 Rp 8,820,000.00
12 Kayu Meranti Balok 8/12 m3 Rp 8,393,400.00
13 Kayu Meranti Balok 6/12 m3 Rp 7,682,400.00
14 Kayu Meranti Usuk 5/7 m3 Rp 8,109,000.00
15 Kayu Meranti Usuk 4/6 m3 Rp 8,109,000.00
16 Kayu Meranti Reng m3 Rp 7,416,000.00
17 Kayu Kruing Papan m3 Rp 9,104,400.00
18 Kayu Kruing Balok 8/12 m3 Rp 8,535,600.00
19 Kayu Kruing Balok 6/12 m3 Rp 8,535,600.00
20 Kayu Kruing Usuk 5/7 m3 Rp 8,251,200.00
21 Kayu Kruing Usuk 4/6 m3 Rp 8,251,200.00
22 Reng Kruing ikat Rp 7,966,800.00
23 Seseh Balok mtr Rp 28,800.00
24 Papan begesting lbr Rp 17,100.00
25 Balok bingkirai m3 Rp 12,575,700.00
26 Papan bingkirai m3 Rp 13,087,800.00
27 Plywood 9 mm lbr Rp 136,800.00
28 Seseh Dolken mtr Rp 102,600.00
29 Multipleks
30 - 6 mm lbr Rp 97,200.00
NO URAIAN SATUAN HARGA SATUAN Keterangan
1 2 3 4 5
31 - 9 mm lbr Rp 163,800.00
32 - 12 mm lbr Rp 190,800.00
33 - 18 mm lbr Rp 310,500.00
34 Dolken kayu 8-10/4m btg Rp 115,200.00
35 List Kayu 2/4 - 4 m btg Rp 60,300.00
36 Kayu profil btg Rp 88,200.00
37 Kayu Perancah m3 Rp 5,121,900.00

M BAHAN BAMBU
1 Bambu Besar btg Rp 28,800.00
2 Bambu Sedang btg Rp 20,700.00
3 Bambu Kecil btg Rp 13,500.00
4 Gedeg Kelas I m2 Rp 34,200.00
5 Gedeg Kelas II m2 Rp 30,600.00

N BETON CETAK
1 Buis Beton 50/1 m` bj Rp 156,600.00
2 Buis Beton 30/1 m` bj Rp 122,400.00
3 Buis Beton 25/1 m` bj Rp 88,200.00
4 Buis Beton 20/1 m` bj Rp 54,000.00
5 Buis Beton 50/0,75 m` bj Rp 134,100.00
6 Buis Beton 30/0,75 m` bj Rp 99,900.00
7 Buis Beton 25/0,75 m` bj Rp 57,600.00
8 Buis Beton 20/0,75 m` bj Rp 41,400.00
9 Buis Beton dia 1 m, H=0,5 m, t= 0,05 m bj Rp 256,500.00
10 Batako Cetak Lubang KW I bj Rp 2,500.00
11 Paving Blok / 6 cm m2 Rp 111,600.00
12 Paving Blok / 8 cm m2 Rp 134,100.00

O KERAMIK
1 Keramik KW I 20/25 cm m2 Rp 92,700.00
2 Keramik KW I 20/20 cm m2 Rp 80,100.00
3 Keramik KW I 30/30 cm putih polos m2 Rp 76,500.00
4 Keramik KW I 40/40 cm putih polos m2 Rp 79,200.00
5 Granit 40/40 m2 Rp 313,200.00

P BAHAN BESI
1 Besi Beton Polos
- besi Ø 4 mm ljr / btg Rp 21,600.00
- besi Ø 6 mm ljr / btg Rp 33,300.00
- besi Ø 8 mm ljr / btg Rp 51,300.00
- besi Ø 10 mm ljr / btg Rp 79,200.00 Rp 10,710.37
- besi Ø 12 mm ljr / btg Rp 105,300.00 harga rata2 per kg
- besi Ø 16 mm ljr / btg Rp 189,900.00
- besi Ø 18 mm ljr / btg Rp 234,000.00
- besi Ø 22 mm ljr / btg Rp 290,700.00
- besi Ø 24 mm ljr / btg Rp 356,400.00
2 Besi Beton ulir
- besi D 13 mm ljr Rp 145,800.00 Rp 10,917.27
- besi D 16 mm ljr Rp 207,000.00 harga rata2 per kg
- besi D 19 mm ljr Rp 305,100.00
NO URAIAN SATUAN HARGA SATUAN Keterangan
1 2 3 4 5
Q KAWAT
1 Kawat Ikat Beton kg Rp 25,200.00
2 Kawat nyamuk 1 x 2 m m2 Rp 28,800.00
3 Kawat Harmonika 5 x 5 cm m2 Rp 40,500.00
4 Kawat Harmonika 4 x 4 cm m2 Rp 45,900.00
5 Kawat Harmonika 3 x 3 cm m2 Rp 47,700.00
6 Kawat 4 mm kg Rp 20,700.00
7 Besi Strip kg Rp 17,100.00
8 Besi Profil WF kg Rp 18,900.00

R BAHAN PLAFON
1 Eternit Klas I (1/1) M lbr Rp 26,100.00
2 Eternit Klas II (1/1) M lbr Rp 20,700.00
3 Triplek 3 mm lbr Rp 77,400.00
4 Teak Wood 4 mm lbr Rp 148,500.00
5 Teak Wood 3 mm lbr Rp 117,000.00
6 Ceilingteak lbr Rp 145,800.00
7 Aluminium Foil (Pj=60, l=100) glg Rp 342,000.00
8 Kalsiboard lbr Rp 80,100.00
9 Gypsum lbr Rp 79,200.00
10 List Gypsum m' Rp 24,300.00

S BAHAN PIPA
1 Pipa Galvanis 6 m'
- ø 3" btg (6m) Rp 1,455,000.00
- ø 4" btg (6m) Rp 2,148,000.00
- ø 6" btg (6m) Rp 3,694,000.00
- ø 8" btg (6m) Rp 4,742,000.00
- ø 10" btg (6m) Rp 5,592,000.00
- ø 2" btg (6m) Rp 660,600.00
- ø 1,5" btg (6m) Rp 495,000.00
- ø 1,25" btg (6m) Rp 428,400.00
- ø 1" btg (6m) Rp 305,100.00
- ø 0,75" btg Rp 199,800.00
- ø 0,5" btg Rp 169,200.00
2 Pipa PVC AW 4 m'
- ø 4" btg Rp 313,200.00
- ø 3" btg Rp 239,400.00
- ø 2,5" btg Rp 176,400.00
- ø 2" btg Rp 120,000.00
- ø 1,5" btg Rp 97,200.00
- ø 1" btg Rp 60,300.00
- ø 0,75" btg Rp 40,500.00
- ø 0,5" btg Rp 30,600.00
3 Pipa PVC C 4 m'
- ø 4" btg Rp 85,500.00
4 Pipa PVC D 4 m'
- ø 4" btg Rp 182,700.00
- ø 3" btg Rp 126,000.00
- ø 2,5" btg Rp 91,800.00
- ø 2" btg Rp 68,400.00
- ø 1,5" btg Rp 45,900.00
NO URAIAN SATUAN HARGA SATUAN Keterangan
1 2 3 4 5
- ø 1" btg Rp 40,500.00
- ø 0,75" btg Rp 34,200.00
- ø 0,5" btg Rp 28,800.00
5 Pipa listrik btg Rp 9,900.00
6 Pipa Paralon 5/8 " btg Rp 9,000.00
7 Pipa PVC S - 10
- Pipa PVC ø 32 mm (MOF) btg Rp 69,500.00
- Pipa PVC ø 40 mm (MOF) btg Rp 102,900.00
- Pipa PVC ø 50 mm (MOF) btg Rp 162,700.00
- Pipa PVC ø 32 mm (SCJ) 6m btg Rp 69,500.00
- Pipa PVC ø 40 mm (SCJ) 6m btg Rp 102,900.00
- Pipa PVC ø 50 mm (SCJ) 6m btg Rp 198,000.00
- Pipa PVC ø 63 mm (SCJ) 6m btg Rp 302,000.00
- Pipa PVC ø 75 mm (SCJ) 6m btg Rp 432,000.00
- Pipa PVC ø 90 mm (SCJ) 6m btg Rp 617,000.00
- Pipa PVC ø 110 mm (SCJ) 6m btg Rp 932,000.00
- Pipa PVC ø 160 mm (SCJ) 6m btg Rp 1,970,000.00
- Pipa PVC ø 200 mm (SCJ) 6m btg Rp 2,655,900.00
- Pipa PVC ø 250 mm (SCJ) 6m btg Rp 4,151,000.00
- Pipa PVC ø 280 mm (SCJ) 6m btg Rp 5,242,100.00
- Pipa PVC ø 315 mm (SCJ) 6m btg Rp 6,606,100.00
- Pipa PVC ø 63 mm (RRJ) 6m btg Rp 313,000.00
- Pipa PVC ø 75 mm (RRJ) 6m btg Rp 385,400.00
- Pipa PVC ø 90 mm (RRJ) 6m btg Rp 598,000.00
- Pipa PVC ø 110 mm (RRJ) 6m btg Rp 933,000.00
- Pipa PVC ø 160 mm (RRJ) 6m btg Rp 1,940,000.00
- Pipa PVC ø 200 mm (RRJ) 6m btg Rp 2,730,000.00
- Pipa PVC ø 250 mm (RRJ) 6m btg Rp 4,249,400.00
- Pipa PVC ø 280 mm (RRJ) 6m btg Rp 5,369,800.00
- Pipa PVC ø 315 mm (RRJ) 6m btg Rp 6,742,900.00
- Pipa PVC ø 355 mm (RRJ) 6m btg Rp 8,672,200.00
- Pipa PVC ø 400 mm (RRJ) 6m btg Rp 11,224,800.00
- Pipa PVC ø 500 mm (RRJ) 6m btg Rp 17,590,500.00
- Pipa PVC ø 630 mm (RRJ) 6m btg Rp 28,790,400.00
8 Pipa PVC S - 12,5
- Pipa PVC ø 50 mm (MOF) 6m btg Rp -
- Pipa PVC ø 63 mm (MOF) 6m btg Rp -
- Pipa PVC ø 90 mm (MOF) 6m btg Rp -
- Pipa PVC ø 20 mm (SCJ) 6m btg Rp 24,700.00
- Pipa PVC ø 25 mm (SCJ) 6m btg Rp 37,300.00
- Pipa PVC ø 32 mm (SCJ) 6m btg Rp 59,100.00
- Pipa PVC ø 40 mm (SCJ) 6m btg Rp 90,500.00
- Pipa PVC ø 50 mm (SCJ) 6m btg Rp 161,000.00
- Pipa PVC ø 63 mm (SCJ) 6m btg Rp 236,000.00
- Pipa PVC ø 75 mm (SCJ) 6m btg Rp 338,000.00
- Pipa PVC ø 90 mm (SCJ) 6m btg Rp 488,000.00
- Pipa PVC ø 110 mm (SCJ) 6m btg Rp 714,000.00
- Pipa PVC ø 160 mm (SCJ) 6m btg Rp 1,526,000.00
- Pipa PVC ø 200 mm (SCJ) 6m btg Rp 2,160,000.00
- Pipa PVC ø 250 mm (SCJ) 6m btg Rp 3,396,500.00
- Pipa PVC ø 280 mm (SCJ) 6m btg Rp 4,256,800.00
- Pipa PVC ø 315 mm (SCJ) 6m btg Rp 5,414,000.00
NO URAIAN SATUAN HARGA SATUAN Keterangan
1 2 3 4 5
- Pipa PVC ø 63 mm (RRJ) 6m btg Rp 260,000.00
- Pipa PVC ø 75 mm (RRJ) 6m btg Rp 369,000.00
- Pipa PVC ø 90 mm (RRJ) 6m btg Rp 524,000.00
- Pipa PVC ø 110 mm (RRJ) 6m btg Rp 756,000.00
- Pipa PVC ø 160 mm (RRJ) 6m btg Rp 1,589,000.00
- Pipa PVC ø 200 mm (RRJ) 6m btg Rp 2,231,200.00
- Pipa PVC ø 250 mm (RRJ) 6m btg Rp 3,491,500.00
- Pipa PVC ø 280 mm (RRJ) 6m btg Rp 4,379,700.00
- Pipa PVC ø 315 mm (RRJ) 6m btg Rp 5,545,300.00
- Pipa PVC ø 355 mm (RRJ) 6m btg Rp 7,261,000.00
- Pipa PVC ø 400 mm (RRJ) 6m btg Rp 9,160,900.00
- Pipa PVC ø 500 mm (RRJ) 6m btg Rp 14,551,700.00
- Pipa PVC ø 630 mm (RRJ) 6m btg Rp 23,610,400.00
9 PIPA PVC S -16
- Pipa PVC ø 32 mm (SCJ) 6m btg Rp 49,700.00
- Pipa PVC ø 50 mm (SCJ) 6m btg Rp 119,200.00
- Pipa PVC ø 63 mm (SCJ) 6m btg Rp 132,200.00
- Pipa PVC ø 75 mm (SCJ) 6m btg Rp 241,900.00
- Pipa PVC ø 90 mm (SCJ) 6m btg Rp 355,500.00
- Pipa PVC ø 110 mm (SCJ) 6m btg Rp 532,000.00
- Pipa PVC ø 160 mm (SCJ) 6m btg Rp 1,063,300.00
- Pipa PVC ø 63 mm (RRJ) 6m btg Rp 198,500.00
- Pipa PVC ø 75 mm (RRJ) 6m btg Rp 270,400.00
- Pipa PVC ø 90 mm (RRJ) 6m btg Rp 386,800.00
- Pipa PVC ø 110 mm (RRJ) 6m btg Rp 568,900.00
- Pipa PVC ø 160 mm (RRJ) 6m btg Rp 1,117,700.00
10 PIPA HDPE TYPE PE 100-S 6,3
- SDR 13,6 PN 12,5 ø 50 mm rol Rp 4,944,000.00
- SDR 13,6 PN 12,5 ø 63 mm rol Rp 6,235,600.00
- SDR 13,6 PN 12,5 ø 90 mm rol Rp 6,348,500.00
- SDR 13,6 PN 12,5 ø 110 mm rol Rp 1,126,400.00
11 PIPA HDPE TYPE PE 100-S 8/PN 10
- SDR 17 PN 10 ø 50 mm Rol (100 m) Rp 3,787,000.00
- SDR 17 PN 10 ø 63 mm Rol (100 m) Rp 6,055,000.00
- SDR 17 PN 10 ø 75 mm Rol (50 m) Rp 4,163,000.00
- SDR 17 PN 10 ø 90 mm Rol (50 m) Rp 5,993,000.00
- SDR 17 PN 10 ø 110 mm Btg (6 m) Rp 1,074,000.00
- SDR 17 PN 10 ø 125 mm Btg (6 m) Rp 1,369,000.00
- SDR 17 PN 10 ø 140 mm Btg (6 m) Rp 1,720,000.00
- SDR 17 PN 10 ø 160 mm Btg (6 m) Rp 2,250,000.00
- SDR 17 PN 10 ø 200 mm Btg (6 m) Rp 3,523,000.00
12 PIPA HDPE TYPE PE 100-S 10
- SDR 21 PN 8 ø 50mm (100 m) Rol (100 m) Rp 3,110,000.00
- SDR 21 PN 8 ø 63mm (100 m) Rol (100 m) Rp 4,837,000.00
- SDR 21 PN 8 ø 75 mm (50 m) Rol (50 m) Rp 3,476,000.00
- SDR 21 PN 8 ø 90 mm (50 m) Rol (50 m) Rp 4,949,000.00
- SDR 21 PN 8 ø 110 mm (6 m) Btg (6 m) Rp 887,000.00
- SDR 21 PN 8 ø 125 mm (6 m) Btg (6 m) Rp 1,139,000.00
- SDR 21 PN 8 ø 140 mm (6 m) Btg (6 m) Rp 1,424,000.00
- SDR 21 PN 8 ø 160 mm (6 m) Btg (6 m) Rp 1,864,000.00
- SDR 21 PN 8 ø 200 mm (6 m) Btg (6 m) Rp 2,906,000.00
13 PIPA HDPE TYPE PE 100-S 12,5
NO URAIAN SATUAN HARGA SATUAN Keterangan
1 2 3 4 5
- SDR 26 PN 6,3 ø 50mm (100 m) rol Rp 2,305,400.00
- SDR 26 PN 6,3 ø 63 mm (100 m) rol Rp 3,481,000.00
- SDR 26 PN 6,3 ø 90mm (50 m) rol Rp 2,478,500.00
- SDR 26 PN 6,3 ø 110 mm (6 m) btg Rp 3,586,500.00
Socket PE Compression dia 63 bh Rp 174,900.00
Socket PE Compression dia 90 bh Rp 355,400.00
Socket PE Compression dia 110 bh Rp 449,700.00

T BAHAN FINISHING
1 Amplas lbr Rp 6,300.00
2 Minyak Cat ltr Rp 26,100.00
3 Meni kayu kg Rp 37,800.00
4 Plamir kayu kg Rp 34,200.00
5 Cat Dasar Kayu kg Rp 43,200.00
6 Cat Kayu kg Rp 70,200.00
7 Plamir Tembok kg Rp 26,100.00
8 Cat Dasar Tembok kg Rp 38,700.00
9 Cat Tembok kg Rp 77,400.00
10 Meni Besi kg Rp 40,500.00
11 Dempul kg Rp 37,800.00
12 Cat Besi kg Rp 74,700.00
13 Politur ltr Rp 57,000.00
14 Politur jadi ( Ultran ) ltr Rp 85,500.00
15 Teak Oil ltr Rp 74,700.00
16 Spritus ltr Rp 15,300.00
17 Sirlak kg Rp 68,400.00
18 Oker kg Rp 74,700.00
19 Lem Kayu kg Rp 34,200.00
20 Impra kg Rp 72,000.00

U BAHAN KACA
1 Kaca Bening 5 mm m2 Rp 129,000.00
2 Kaca Bening 3 mm m2 Rp 131,000.00
3 Kaca Ray-Ban 5 mm m2 Rp 151,000.00
4 Nako + Tralis m2 Rp 317,000.00

V ALAT PENGUNCI
1 Kunci 2 Slaag bh Rp 256,500.00
2 Kunci 1 Slaag bh Rp 148,500.00
3 Kunci KM/ WC bh Rp 82,800.00
4 Kunci Gembok bh Rp 57,600.00
5 Grendel bh Rp 23,400.00

W ALAT PENGGANTUNG
1 Kait Angin psg Rp 34,200.00
2 Engsel kupu-kupu psg Rp 43,200.00
3 Engsel Nilon psg Rp 40,500.00
4 Espanolet bh Rp 143,100.00

X BAHAN SANITAIR
1 Washtafel bh Rp 939,600.00
2 Urinoir bh Rp 2,049,300.00
NO URAIAN SATUAN HARGA SATUAN Keterangan
1 2 3 4 5
3 Closet Jongkok bh Rp 270,900.00
4 Closet Duduk bh Rp 1,729,800.00
5 Bak Mandi Fiber bh Rp 432,900.00
6 Bak Mandi Keramik bh Rp 356,400.00
7 Floordrain bh Rp 85,500.00
8 Shower bh Rp 199,800.00
9 Kran Air bh Rp 53,500.00
10 Pompa air 150 watt bh Rp 682,200.00
11 Pompa air 250 watt bh Rp 1,006,200.00
12 Selang Air 1/2' m Rp 8,100.00
13 Selang Air 3/4' m Rp 9,900.00

Y BAHAN PAKU
1 Paku Lis kg Rp 24,300.00
2 Paku Reng kg Rp 19,800.00
3 Paku Usuk kg Rp 18,900.00
4 Paku Seng kg Rp 23,400.00
5 Paku Sekrup 1/2" ktk Rp 28,800.00
6 Paku Sekrup 2" ktk Rp 28,800.00
7 Paku gypsum kg Rp 43,200.00
8 Paku beton 5 cm kg Rp 60,300.00
9 Paku beton 3" ktk Rp 65,700.00
10 Paku pancing ktk Rp 82,800.00

Z LAIN-LAIN
1 Aspal
- Aspal Emulsi kg Rp 17,100.00
- Aspal Cutback kg Rp 17,100.00
- Aspal Bitumen kg Rp 15,300.00
- Aspal Curah ltr Rp 14,400.00
2 Solar ltr Rp 8,100.00
3 Oli Bh Rp 51,300.00
4 Sikat Ijuk buah Rp 28,800.00
5 Aluminium Anti Gores/Gloos 3" m' Rp 152,100.00
6 Pintu Aluminium Anti Gores/Gloss Kaca 5mm (swing) unit Rp 3,130,200.00
7 Pintu Aluminium Anti Gores/Gloss Kaca 5mm (slide) unit Rp 3,414,600.00
8 Pintu Aluminium Anti Gores/Gloss Kaca 5mm (spindri) unit Rp 3,642,300.00
9 Pintu Full Kaca (Floring Dorma Tempert 12 mm unit Rp 6,259,500.00
10 Pintu Full Kaca (Floring Dorma Tempert 10 mm unit Rp 5,121,900.00
11 Jendela UK Standart 120 x 60 MAX unit Rp 2,276,100.00
12 Alumnium Kulit Jeruk lbr Rp 108,900.00

Z.1 ALAT UKUR


1 hammer tes 0 Rp 10,535,400.00
2 hammer tes SCHMI dt Type N (Test struktur beton) 0 Rp 26,539,000.00
3 Meteran Elektrik bosch Glm 80 Ap 0 Rp 3,489,200.00
4 Meteran Elektrik Stanley TLM 165 0 Rp 2,764,400.00
5 Meteran dorong digital measuring wheel cod sby 0 Rp 1,628,000.00
6 Meteran dorong digital measuring wheel digital 0 Rp 2,292,700.00
7 Meteran rool 5 meter Stanley tylor tape 0 Rp 118,000.00
8 Meteran rool 30 meter measuring Tape Tajima 0 Rp 725,000.00
9 Meteran rool 30 meter yamayo Stilon 0 Rp 965,800.00
NO URAIAN SATUAN HARGA SATUAN Keterangan
1 2 3 4 5
10 Jangka Sorng Draper 150 mm/6" Vernier Caliper 0 Rp 1,280,000.00
DAFTAR HARGA UPAH, BAHAN DAN ALAT

NO. URAIAN SATUAN HARGA

A UPAH TENAGA KERJA


1 Kepala Tukang o.h Rp 147,900.00
2 Kepala Tukang Batu o.h Rp 147,900.00
3 Kepala Tukang Pipa o.h Rp 132,100.00
4 Kepala Tukang Listrik o.h Rp 132,100.00
5 Mandor o.h Rp 158,000.00
6 Pekerja o.h Rp 101,500.00
7 Operator Alat Berat o.h Rp 158,000.00
8 Asisten Operator o.h Rp 120,600.00
9 Tukang o.h Rp 133,600.00
10 Tukang Listrik o.h Rp 120,600.00
11 Pembantu Teknisi o.h Rp 120,600.00
12 Tukang Batu o.h Rp 133,600.00
13 Tukang Besi o.h Rp 125,000.00
14 Tukang Gali o.h Rp 106,300.00
15 Tukang kayu o.h Rp 140,800.00
16 Tukang Pipa o.h Rp 120,600.00
17 Tukang AC o.h Rp 120,600.00
18 Tukang Las o.h Rp 120,600.00
19 Tukang style Bali o.h Rp 143,600.00
20 Tukang Ukir o.h Rp 146,500.00
21 Pembantu tukang las o.h Rp 120,600.00
22 Supervisor o.h Rp 370,280.00
23 Supervisor elektrika(Tenaga ahli pratama (S1 min 3 th) o.h Rp 370,280.00
24 Supervisor elektron(Tenaga ahli pratama (S1 min 3 th) o.h Rp 370,280.00
25 Supervisor mekanik(Tenaga ahli pratama (S1 min 3 th) o.h Rp 370,280.00
26 Tenaga Ahli Instalas(Tenaga ahli pratama (S1 min 3 th) o.h Rp 370,280.00
27 Tenaga Ahli Elektri(Tenaga ahli utama (S1 min 13 th) o.h Rp 744,800.00
28 Tenaga Ahli Progr (Tenaga ahli utama (S1 min 13 th) o.h Rp 744,800.00
29 Teknisi (Technician (D3/S0) o.h Rp 443,840.00
30 Ahli elektronik o.h Rp 370,280.00
31 Engineer Programming o.h Rp 3,750,000.00
32 Assistant Engineer Programming o.h Rp 2,500,000.00

B BAHAN

KABEL & HEAD PETIR


Certificated Of Eligibility for Operation ( SLO ) 147 KVA o.h Rp 11,025,000.00
Gambar Proyek o.h Rp 5,250,000.00
BP. Biaya Penyambungan o.h Rp 142,443,000.00
UJL ( Uang Jaminan Langganan ) o.h Rp 25,284,000.00
NO. URAIAN SATUAN HARGA

Pemasangan Genset Silent Type kapasitas min. 150 kVA dilengkapi o.h Rp 475,301,000.00
dengan Alternator ex, Standford, residential mufler, exhaust air duct,
tangki BBM harian, pompa BBM, automatic stater dan semua
perlengkapan yang diperlukan hingga berfungsi dengan baik.

Kabel NYM 2 x 1,5 mm m' Rp 8,533.33


1 Kabel NYM 2 x 2,5mm2 m' Rp 12,166.67
2 Kabel NYM 3 x 2,5mm2 m' Rp 15,800.00
Kabel NYM 3 x 4 mm m' Rp 24,666.67
Kabel NYY 3 x 4 mm m' Rp 25,000.00
3 Kabel NYY 3 x 6 mm2 m' Rp 44,800.00
4 Kabel NYY 3 x 10 mm2 m' Rp 72,800.00
5 Kabel NYY 3 x 16 mm2 m' Rp 100,000.00
6 Kabel NYY 4 x 4 mm2 m' Rp 37,000.00
7 Kabel NYY 4 x 6 mm2 m' Rp 52,333.33
8 Kabel NYY 4 x 10 mm2 m' Rp 83,466.67
9 Kabel NYY 4 x 16 mm2 m' Rp 128,000.00
10 Kabel NYY 4 x 25 mm2 m' Rp 197,500.00
11 Kabel NYFGbY 4 x 25 mm2 m' Rp 225,000.00
12 Kabel NYFGbY 3x2.5 mm m' Rp 38,800.00
13 Kabel NYY 4 x 35 mm2 m' Rp 269,000.00
14 Kabel NYY 4 x 50 mm2 m' Rp 357,250.00
15 Kabel NYY 4 x 70 mm2 m' Rp 507,000.00
16 Kabel NYY 4 x 95 mm2 m' Rp 698,250.00
17 Kabel NYY 4 x 120 mm2 m' Rp 879,000.00
18 Kabel NYY 4 x 150 mm2 m' Rp 1,081,500.00
19 Kabel NYY 4 x 185mm2 m' Rp 1,347,250.00
20 Kabel NYY 4 x 240 mm2 m' Rp 1,779,000.00
21 Kabel NYY 4 x 300 mm2 m' Rp 2,219,500.00
22 Kabel NYMHY 3 x 2,5 mm m' Rp 18,666.67
23 Kabel NYMHY 2 x 1,5 mm m' Rp 8,866.67
24 Kabel Feeder NYFGbY 4 X 70 MM Rp 533,500.00
25 Kabel BC 2.5 mm m' Rp 4,500.00
26 Kabel BC 4 mm m' Rp 6,500.00
27 Kabel BC 6 mm m' Rp 9,250.00
28 Kabel BC 10 mm m' Rp 15,050.00
29 Kabel BC 16 mm m' Rp 22,150.00
30 Kabel BC 25 mm m' Rp 33,800.00
31 Kabel BC 35 mm m' Rp 51,150.00
32 Kabel BC 50 mm m' Rp 67,650.00
33 Kabel BC 70 mm m' Rp 102,150.00
34 Kabel NYY 70 mm m' Rp 124,000.00
35 PVC Conduit 20 mm m Rp 3,350.00
36 Penangkal petir non radioaktif radius 35 m unit Rp 12,000,000.00
37 Spit Tembaga bh Rp 397,800.00
NO. URAIAN SATUAN HARGA

38 Klem Tembaga bh Rp 17,100.00


39 Klem Pipa Conduit bh Rp 400.00
40 T.Doost 1'' bh Rp 1,800.00
41 Socket Conduit 1'' bh Rp 500.00
42 Fisher bh Rp 100.00
43 Kabel Tray 200 m' Rp 191,500.00
44 Kabel Tray 300 m' Rp 244,000.00
45 Kabel Tray 400 m' Rp 287,000.00
46 Kabel Tray 600 m' Rp 469,300.00
47 Stik Grounding Rood 5/8 m' Rp 385,000.00
48 Stik Grounding Rood 3/4 m' Rp 425,000.00
49 Stik Grounding Rood 1" m' Rp 590,800.00
50 Biaya Izin Disnaker setempat Lot Rp 3,500,000.00
51 Pengetesan Air dari Laboratorium lengkap dengan hasil test Lot Rp 1,830,000.00

Kabel Elektronik
FRC 3 x 2,5 mm m Rp 37,500.00
HDMI Cable unit Rp 390,000.00
ITC 2x2x0,6 m Rp 3,000.00
Kabel STP AWG-18 m Rp 13,800.00

KOMPONEN LAMPU LED


LED PANEL 60 X 60 40 W bh Rp 767,250.00
TL LED 14.5 Watt bh Rp 554,000.00
DL LED 9 W D 150 bh Rp 236,500.00
DL LED 7 W D 100 bh Rp 188,000.00
Lampu Flood Light LED 50 W bh Rp 942,000.00
Lampu Taman Bollard LED 7 W bh Rp 3,637,500.00
Downlight Dia 2" Adjustable LED 9 W ( Warm White ) bh Rp 176,000.00
Downlight Dia 2" Adjustable LED 7 W ( Warm White ) bh Rp 125,000.00
Outbow Light Dia 3" LED 5 W ( Cool Day Light ) bh Rp 145,200.00
Hanging Light LED 12 W ( Warm Light ) bh Rp 1,250,000.00
Cozy Light Type Dia 2" ( 2 x LED 9 W ) ( Warm White ) bh Rp 375,000.00
Spot Light Indoor ( LED 10 W ) (Warm White ) bh Rp 285,000.00
Wall Light ( LED 2 x 10 W ) (Warm White ) bh Rp 475,000.00

KOMPONEN LAMPU
RM + Cover T8 2 x 36Watt bh Rp 534,450.00
RM + Cover T8 3 x 18 Watt bh Rp 740,900.00
RM + Cover T8 2 x 18 Watt bh Rp 348,600.00
RM + Grill T8 2 x 36Watt bh Rp 832,300.00
RM + Grille T8 2 x 18 Watt bh Rp 275,000.00
Lampu TL Balk Premium 1 x 36 watt bh Rp 340,500.00
Lampu TKOU 2 x 36 watt Powder Coating bh Rp 721,000.00
Lampu TKOU 2 x 18 watt Powder Coating bh Rp 528,800.00
Lampu SL 18W bh Rp 85,000.00
NO. URAIAN SATUAN HARGA

Lampu Merkuri 80 W (HPIT 250W) bh Rp 2,198,300.00


Downlight + PLC 18 W bh Rp 215,000.00
Downlight + PLC 13 W bh Rp 145,000.00
Lampu Baret 20 W bh Rp 725,000.00
Lampu Dinding 20 W bh Rp 275,000.00
Downlight + PLC 8 W bh Rp 135,000.00
Lampu Spot Tancap Taman 6 Watt LED bh Rp 160,000.00
Strip Light LED 5 W/Mtr Mtr Rp 25,000.00
Tiang 8 Meter Lampu LPJ bh Rp 10,360,000.00
Lampu LPJ 60 Watt LED bh Rp 800,900.00
Lampu Tiang 2 Cabang 2 x 14,5 Watt bh Rp 2,950,000.00

Saklar tunggal / saklar engkel bh Rp 12,670.00


Saklar ganda ( saklar seri ) bh Rp 16,000.00
Saklar Dimmer bh Rp 228,700.00
Saklar Tukar bh Rp 98,000.00
Stop kontak dinding 1 phase bh Rp 14,670.00
Stop kontak AC 1 phase bh Rp 157,300.00
Exhaust Fan Ceiling bh Rp 584,500.00
Stop Kontak Wather Proof bh Rp 36,670.00
Pipa Conduit clipsal 20 mm m' Rp 5,250.00
Dos bh Rp 3,000.00
Fitting lampu E27 bh Rp 12,500.00
Pipa GIP Ø 1 1/2' m' Rp 81,500.00
Pipa GIP Ø 2' m' Rp 111,200.00
Pipa GIP Ø 3' m' Rp 183,000.00
1 unit grounding 1 Ohm
Blitzem dia. 1" bh Rp 250,000.00
BC 70 mm2 m1 Rp 85,500.00
Pipa galvanis dia 1" m1 Rp 98,000.00
Pit box control + cover Bordes Plate t=3.0 mm bh Rp 1,750,000.00

UNIT AC NON VRV


AC wall mounted 0,5 PK unit Rp 3,344,000.00
AC wall mounted 0,75 PK unit Rp 3,487,000.00
AC wall mounted 1 PK unit Rp 3,630,000.00
AC wall mounted 1,5 PK unit Rp 4,576,000.00
AC wall mounted 2 PK unit Rp 6,039,000.00
AC wall mounted 2,5 PK unit Rp 8,580,000.00
AC ceiling cassette 4 way 2 PK unit Rp 11,366,000.00
AC ceiling cassette 4 way 4 PK unit Rp 18,001,600.00

UNIT AC VRV
AC VRV Type Wall Mounted 7.500 Btuh unit Rp 9,211,200.00
AC VRV Type Wall Mounted 9.600 Btuh unit Rp 9,568,400.00
AC VRV Type Wall Mounted 12.300 Btuh unit Rp 9,918,000.00
NO. URAIAN SATUAN HARGA

AC VRV Type Wall Mounted 15.400 Btuh unit Rp 10,510,800.00


AC VRV Type Wall Mounted 19.100 Btuh unit Rp 12,175,200.00
AC VRV Type Wall Mounted 24.200 Btuh unit Rp 12,760,400.00
AC VRV Type Casset 9.600 Btuh unit Rp 12,357,600.00
AC VRV Type Casset 15.400 Btuh unit Rp 13,619,200.00
AC VRV Type Casset 19.100 Btuh unit Rp 15,922,000.00
AC VRV Type Casset 24.200 Btuh unit Rp 16,613,600.00
AC VRV Type Casset 30.700 Btuh unit Rp 17,183,600.00
AC VRV Type Casset 76.400 Btuh unit Rp 29,138,400.00
AC VRV Type Midle static Duct 7.500 Btuh unit Rp 10,799,600.00
AC VRV Type Midle static Duct 9.600 Btuh unit Rp 11,263,200.00
AC VRV Type Midle static Duct 12.300 Btuh unit Rp 11,833,200.00
AC VRV Type Midle static Duct 19.100 Btuh unit Rp 14,706,000.00
AC VRV Type Midle static Duct 24.200 Btuh unit Rp 15,397,600.00
AC VRV Type Duct 54.600 Btuh unit Rp 18,384,400.00
Out door AC VRV RXQ38AMY14 unit Rp 248,572,000.00
Out door AC VRV RXQ40AMY14 unit Rp 282,458,400.00
Out door AC VRV RXQ42AMY14 unit Rp 282,575,600.00
Out door AC VRV RXQ46AMY14 unit Rp 316,350,000.00
Out door AC VRV RXQ48AMY14 unit Rp 329,794,400.00

AC VRV Type Home Series Outdoor Unit 114.336 Btuh unit Rp 69,958,000.00
AC VRV Type Home Series Outdoor Unit 95.564 Btuh unit Rp 58,884,800.00
AC VRV Type Home Series Outdoor Unit 76.451 Btuh unit Rp 49,772,400.00
3Di+ Ducted Indoor Unit + Remote 24.232 Btuh unit Rp 17,670,000.00
3Di+ Ducted Indoor Unit + Remote 19.113 Btuh unit Rp 16,841,600.00
Refnet For 3 Pipe System KHRP24B22T unit Rp 1,421,200.00
Refnet For 3 Pipe System KHRP24B33T unit Rp 1,421,200.00
Refnet For 3 Pipe System KHRP24B72T unit Rp 1,421,200.00
VRV Outdoor D3 to Modbus Converter unit Rp 2,660,000.00
Wired Remote Controller ( Moisture Control) 3 Pipe System unit Rp 912,000.00
D Smart Home Lite unit Rp 6,566,400.00
Twisted Shielded AWG #18 + NYYHY 2x2.5 mm2 m Rp 18,500.00
Dia. 1/4" m Rp 12,320.00
Dia. 5/8" m Rp 51,207.00
Dia. 3/8" m Rp 25,345.00
Dia. 1/2" m Rp 36,207.00
Dia. 3/4" m Rp 61,034.00
Dia. 7/8" m Rp 76,552.00
Dia. 1" m Rp 87,931.00
Extra refrigerant charge Kg Rp 250,000.00

material bantu unit Rp 300,000.00


material bantu outdoor unit unit Rp 750,000.00
Pipa refrigerant Copper tube, ø1/4"+ø1/2" m Rp 85,000.00
Pipa refrigerant Copper tube, Ø 3/8" dan 5/8" m Rp 200,000.00
NO. URAIAN SATUAN HARGA

Pipa refrigerant Copper tube, Ø 3/4" dan 1 5/8" m Rp 486,000.00


Isolasi tebal 9 mm m Rp 15,000.00
Grill Ac 250 mm x 250 mm bh Rp 225,000.00
Volume demper bh Rp 980,000.00
Exhaust Fan 1000 CFM unit Rp 4,850,000.00
Exhaust Fan 500 CFM unit Rp 2,950,000.00
Polyurethane m2 Rp 152,000.00
Compact axial Flow ventilating fan, Cap. 84 cfm unit Rp 850,000.00

SOUND SYSTEM & AIPHONE


Terminal Box unit Rp 625,000.00
Horn Speaker 15W bh Rp 625,000.00
Speaker Dinding 10 W bh Rp 1,022,800.00
Ceiling speaker 3 W bh Rp 284,100.00
Ceiling speaker 6 W bh Rp 218,000.00
Volume control 30 W bh Rp 170,000.00
Terminal Box Sound System unit Rp 625,000.00
Digital Matrix Mixer M-9000 unit Rp 20,400,000.00
Paging Mic w/Chime unit Rp 6,349,000.00
CD/MMC/USB Player w/FM Tunner unit Rp 5,990,000.00
Coridoor lamp Rp 382,500.00
Bedside Call button/wall jack Rp 680,000.00
Bath room Call button Rp 715,000.00
Call Reset Button Rp 201,200.00
Ceilling sub station Rp 814,800.00
master station 20 ch Rp 16,715,500.00
master station 40 ch Rp 23,123,500.00
Microphone Ceiling unit Rp 349,000.00
Master Station AIPHONE 20 ch unit Rp 14,215,000.00
Master Station AIPHONE 40 ch unit Rp 20,400,000.00
Microtic RB1100 unit Rp 5,870,000.00
Swicth HP 8GPort unit Rp 8,200,000.00
Swicth HP 24GPort unit Rp 11,800,000.00
Rack Server 42U unit Rp 12,300,000.00
Rack Wallmount 9U Ciscom unit Rp 2,200,000.00
Access Point Ruijie AP 720L unit Rp 1,890,000.00
Swicth Rujie 8 PoE Port unit Rp 3,820,000.00
Swicth Rujie 24 PoE Port unit Rp 7,680,000.00
Inst. Kabel AWG 16 m Rp 21,245.00
Inst.Kabel Optic ADAT dan Kabel S/PDIF m Rp 158,000.00
Inst. Kabel BNC Multiple digital workstation m Rp 75,000.00

Wireless Handheld Mic w/ Receiver WM-5265 unit Rp 12,180,000.00


Wireless Antenna unit Rp 2,432,000.00
Desk Stand Mic unit Rp 350,000.00
Wireless Antenna unit Rp 2,432,000.00
NO. URAIAN SATUAN HARGA

Graphic Equalizer unit Rp 6,600,000.00


Slim Array Speaker unit Rp 8,740,000.00
Digital Amplifier unit Rp 8,513,000.00
Mixer 16 Ch unit Rp 13,500,000.00
Portable Flight Case Rack unit Rp 10,000,000.00
Proj. SONY WUXGA 5000 AL unit Rp 32,700,000.00
Screen Motorized 213x213 unit Rp 5,000,000.00
Braket unit Rp 1,000,000.00
Fibaro Home Centre System Rp 19,550,000.00
Fibaro Dimmer 2 Rp 1,700,000.00
IR Blaster For AC Rp 2,200,000.00
Fibaro Single Switch Rp 1,700,000.00
Fibaro Door Window Sensor Rp 1,700,000.00
Fibaro Key FOB Rp 1,700,000.00

Denon AVR-X2600H 7.2-Ch x 95 Watts A/V Receiver w/HEOS unit Rp 11,250,000.00


DENON PMA-800NE INTEGRATED AMPLIFIER WITH 85W POWE unit Rp 8,320,000.00
Bose Solo 5 TV sound system unit Rp 9,000,000.00
Bose Black Bass Module 700 - 809108-1100 unit Rp 13,723,060.00
Bose Surround Speakers unit Rp 5,970,000.00
Audiobank Alpha Two + Touchscreen Monitor / Audiobank Lebar layar unit Rp 5,250,000.00
JBL VM300 Wireless Microphone System / Mic wireless unit Rp 5,450,000.00
4k Led TV Full HD 65” QLED Q60R 4K Smart TV SAMSUNG unit Rp 26,000,000.00
DVD player Blu Ray Sony BDP- S6700 unit Rp 1,899,000.00

FIRE ALARM
MCFA 50 Zone bh Rp 25,400,000.00
Annunciator bh Rp 16,700,000.00
ROR heat detector bh Rp 284,100.00
Fix detector bh Rp 289,800.00
Smoke detector bh Rp 795,500.00
Break Glass bh Rp 511,400.00
Indicator lamp bh Rp 284,100.00
Alarm bell bh Rp 511,400.00
Manual Push Button bh Rp 891,000.00
TB/FA lengkap dengan Interface Modul bh Rp 5,850,000.00
End of line bh Rp 36,762.00

TELEPON & DATA


Telepon outlet bh Rp 185,000.00
Kabel ITC 40x2x0,6mm2 m' Rp 63,000.00
Kabel ITC 30x2x0,6mm2 m' Rp 49,250.00
Kabel ITC 20x2x0,6mm2 m' Rp 37,750.00
Kabel ITC 10x2x0,6mm3 m' Rp 19,000.00
NO. URAIAN SATUAN HARGA

Kabel ITC 2x2x0,6mm2 m' Rp 3,000.00


Data/Lan outlet bh Rp 170,500.00
Accses Point bh Rp 1,890,000.00
Switch Ruijie 8 PoE Port unit Rp 3,820,000.00
Switch Ruijie 24 PoE Port unit Rp 7,680,000.00
Kabel Data Cat 5 m' Rp 5,750.00
Kabel Data Cat 6 m' Rp 7,900.00
PABX KX – NS300 PANASONIC 64 Ext unit Rp 40,223,000.00
PABX KX – NS300 PANASONIC 48 Ext unit Rp 35,270,000.00
PABX KX-TES 824 Panasonic unit Rp 5,200,000.00
TB Telepon Rp 720,000.00
Jelly Armoured 10P x 0,6 mm Rp 49,000.00
MDF unit Rp 1,200,000.00
Ups 1000 VA Unit Rp 1,820,000.00
Handset Telepon unit Rp 222,750.00
UPS 1,200 VA unit Rp 2,150,000.00
Main Distribution Frame (MDF). 20 pair Krone LSA terminal unit Rp 1,750,000.00
Mikrotik 10 gb port router unit Rp 4,970,000.00
Internet Provider Rp 1,750,000.00

MATV
Antenna Parabola 6 feet c/w double & tower unit Rp 3,380,000.00
UHF Antenna unit Rp 1,600,000.00
IF Active splitter 8 way unit Rp 1,182,000.00
Receiver Digital unit Rp 2,414,000.00
Sterio Universal Modulator unit Rp 6,550,000.00
Universal Hybrid Amplifier unit Rp 3,060,000.00
Power Supply Unit unit Rp 4,350,000.00
19" Mounting unit Rp 1,470,000.00
Selectif Programable 10 Chanel unit Rp 11,680,000.00
Passive Combiner unit Rp 1,280,000.00
Professional Headend Rack unit Rp 6,196,000.00
TV Monitor 14" unit Rp 3,250,000.00
Directional coupler / tap off 2 way -F-Type unit Rp 145,000.00
Splitter 4 way -F-Type unit Rp 145,000.00
Splitter 6 way -F-Type unit Rp 450,000.00
Splitter 8 way -F-Type unit Rp 500,000.00
Splitter 10 way -F-Type unit Rp 750,000.00
Boster unit Rp 350,000.00
Outlet TV Rp 189,700.00
Mangkok Listrik Rp 25,600.00
Isolasi Rp 7,667.00
Kabel Coaxial RG-11 m Rp 16,500.00
TV Splitter 6 Way unit Rp 610,000.00
TB Televisi unit Rp 850,000.00
NO. URAIAN SATUAN HARGA

Tata Suara
Speaker Dinding 10 W bh Rp 1,022,800.00
Emergency Speaker 6 W bh Rp 957,000.00
Volume control 30 W bh Rp 341,000.00
Ceiling Speaker bh Rp 654,000.00
Speaker Selector bh Rp 4,500,000.00
Digital Matrix Mixer set Rp 35,507,000.00
Power Amplifier 480 W bh Rp 9,791,000.00
Emergency Message Panel bh Rp 10,861,000.00
CD/MMC/USB Player w/FM Tunner bh Rp 5,999,000.00
Remote Microphone bh Rp 6,740,000.00
Cabinet Rack w/acc lot Rp 20,262,000.00
Mixer Amplifier 120 W w/USB Player unit Rp 4,117,000.00
Mic w/Chime unit Rp 1,820,000.00
Terminal Box unit Rp 630,000.00

HX Series Speaker System (Center Atas) unit Rp 9,393,000.00


HS Series Speaker System (Center Bawah) unit Rp 2,716,000.00
Subwoofer System unit Rp 15,300,000.00
Wall Speaker unit Rp 1,519,000.00
Speaker Management unit Rp 25,681,000.00
Multi Ch Power Amplifier unit Rp 21,522,000.00
Power Amplifier unit Rp 8,513,000.00
PC include Digital Bluray unit Rp 85,000,000.00
4k Led TV Full HD 65 Inch unit Rp 17,051,000.00
DVD player Blue Ray unit Rp 3,150,000.00

CCTV
Dome IR Camera, 1/3” 2MP AHD 1080P, 4pcs Array LED, IR 20M, 4m unit Rp 4,390,176.00
Outdoor IR Camera, 1/3” 2MP AHD 1080P, 4pcs Array LED, IR 20M, unit Rp 5,643,000.00
Kabel Coaxial RG 6 m' Rp 17,100.00
DVR 16ch, CJ-HDR416 unit Rp 11,855,000.00
Colour Monitor 22" ( Multi Screen ) unit Rp 11,800,000.00
NVR 32Ch + HD 6 tera Portec unit Rp 12,300,000.00
NVR 16Ch + HD 6 tera Portec unit Rp 35,270,000.00
IP Camera Indoor Protech SND 6020 unit Rp 1,500,000.00
IP Camera Outdoor Protech SND 6020 unit Rp 16,200,000.00
Switch Ruijie 8 PoE Port unit Rp 3,820,000.00
Switch Ruijie 24 PoE Port unit Rp 7,680,000.00
Network Video Recorder (NVR) 16 Channel HDD 2 TB, include unit Rp 6,540,000.00
Network Video Recorder (NVR) 32 Channel HDD 2 TB, include unit Rp 8,750,000.00
LED Display 32" unit Rp 3,750,000.00

KOMPONEN PANEL
MCCB 160-400 A / 36 kA 3p ( 50 KA ) bh Rp 8,582,200.00
MCCB 200 A / 36 kA 3p bh Rp 3,269,200.00
NO. URAIAN SATUAN HARGA

MCCB 160 A / 36 kA 3p bh Rp 3,020,600.00


MCCB 125 A / 36 kA 3p bh Rp 2,381,500.00
MCCB 100 A / 25 kA 3p bh Rp 1,524,600.00
MCCB 80 A / 25 kA 3p bh Rp 1,524,600.00
MCCB 63 A / 25 kA 3p bh Rp 1,524,600.00
MCCB 50 A / 25 kA 3p bh Rp 1,409,100.00
MCCB 40 A / 25 kA 3p bh Rp 1,409,100.00
MCCB 32 A / 25 kA 3p bh Rp 1,409,100.00
MCCB 25 A / 25 kA 3p bh Rp 1,409,100.00
MCCB 20 A / 25 kA 3p bh Rp 1,409,100.00
MCB 63 A / 10 kA 3p bh Rp 1,018,800.00
MCB 50 A / 10 kA 3p bh Rp 838,200.00
MCB 40 A / 10 kA 3p bh Rp 598,950.00
MCB 32 A / 10 kA 3p bh Rp 586,300.00
MCB 25 A / 10 kA 3p bh Rp 550,000.00
MCB 20 A / 10 kA 3p bh Rp 512,050.00
MCB 16 A / 10 kA 3p bh Rp 512,050.00
MCB 10 A / 10 kA 3p bh Rp 512,050.00
MCB 6 A / 4,5 kA 1p bh Rp 66,550.00
MCB 10 A / 4,5kA 1p bh Rp 66,550.00
MCB 16 A / 4,5kA 1p bh Rp 66,550.00
MCB 20 A / 4,5kA 1p bh Rp 66,550.00
MCB 25 A / 4,5kA 1p bh Rp 75,350.00
MCB 32 A / 4,5kA 1p bh Rp 78,100.00
MCB 40 A / 4,5kA 1p bh Rp 89,450.00
COS 63 A bh Rp 1,100,000.00
COS 100 A bh Rp 1,800,000.00
Box panel 1200 x 800 x 300mm bh Rp 6,245,800.00
Box panel 1000 x 800 x 300mm bh Rp 4,200,900.00
Box panel 800 x 600 x 200mm bh Rp 2,270,400.00
Box panel 700 x 500 x 200mm bh Rp 2,064,700.00
Voltmeter 0-500 V bh Rp 570,000.00
Ampere Meter + CT bh Rp 498,800.00
Selector Switch bh Rp 124,700.00
Frekwensi meter bh Rp 1,146,000.00
Lampu R,S,T + sekring bh Rp 17,900.00
Timer bh Rp 443,200.00
Contactor bh Rp 219,700.00
Unit Lift penumpang bh Rp 450,000,000.00
MCB 6 A/1 Phasa bh Rp 113,175.00
MCB 10 A/1 Phasa bh Rp 113,175.00
MCB 16 A/1 Phasa bh Rp 113,175.00
MCB 20 A/1 Phasa bh Rp 113,175.00
MCB 6 A/3 Phasa bh Rp 691,650.00
MCB 10 A/3 Phasa bh Rp 691,650.00
MCB 16 A/3 Phasa bh Rp 691,650.00
NO. URAIAN SATUAN HARGA

MCB 20 A/3 Phasa bh Rp 691,650.00


MCB 25 A/3 Phasa bh Rp 691,650.00
MCB 32 A/3 Phasa bh Rp 691,650.00
MCB 40 A/3 Phasa bh Rp 691,650.00
MCB 50 A/3 Phasa bh Rp 691,650.00

MCCB 20 A/3 Phasa bh Rp 1,006,000.00


MCCB 25 A/3 Phasa bh Rp 1,006,000.00
MCCB 30 A/3 Phasa bh Rp 1,006,000.00
MCCB 32 A/3 Phasa bh Rp 1,006,000.00
MCCB 40 A/3 Phasa bh Rp 1,006,000.00
MCCB 50 A/3 Phasa bh Rp 1,006,000.00
MCCB 63 A/3 Phasa bh Rp 1,006,000.00
MCCB 125 A/3 Phasa bh Rp 1,928,000.00
MCCB 140 A/3 Phasa bh Rp 1,928,000.00

MCCB 630-1000 A/3 Phasa bh Rp 16,350,000.00


MCCB 630-800 A/3 Phasa bh Rp 16,350,000.00
MCCB 400-1000 A/3 Phasa bh Rp 10,900,000.00
MCCB 400-630 A/3 Phasa bh Rp 10,900,000.00
MCCB 350-500 A/3 Phasa bh Rp 9,478,000.00
MCCB 300-400 A/3 Phasa bh Rp 8,242,000.00
MCCB 250-400 A/3 Phasa bh Rp 7,417,000.00
MCCB 175-320 A/3 Phasa bh Rp 5,192,000.00
MCCB 160-320 A/3 Phasa bh Rp 4,413,500.00
MCCB 125-250 A/3 Phasa bh Rp 3,923,500.00
MCCB 100-250 A/3 Phasa bh Rp 3,051,750.00
MCCB 80-250 A/3 Phasa bh Rp 4,356,500.00
MCCB 80-125 A/3 Phasa bh Rp 3,051,750.00
MCCB 63-80 A/3 Phasa bh Rp 3,051,750.00
MCCB 50-63 A/3 Phasa bh Rp 2,507,001.00
MCCB 40-50 A/3 Phasa bh Rp 2,507,002.00
MCB 25-40 A/3 Phasa bh Rp 2,507,002.00
MCB 20-25 A/3 Phasa bh Rp 2,507,002.00

Bahan Pipa Standart JIS AW


BAHAN PIPA PVC.
Pipa PVC AW Ø 1/2 " m Rp 5,966.67
Pipa PVC AW Ø 3/4 " m Rp 8,033.33
Pipa PVC AW Ø 1 " m Rp 10,966.67
NO. URAIAN SATUAN HARGA

Pipa PVC AW Ø 1 1/4 " m Rp 16,466.67


Pipa PVC AW Ø 1 1/2 " m Rp 18,900.00
Pipa PVC AW Ø 2 " m Rp 24,033.33
Pipa PVC AW Ø 2 1/2 " m Rp 35,233.33
Pipa PVC AW Ø 3 " m Rp 49,683.33
Pipa PVC AW Ø 4" m Rp 79,850.00
Pipa PVC AW Ø 5" m Rp 125,583.33
Pipa PVC AW Ø 6 " m Rp 174,200.00
Pipa PVC AW 1/2" Perporated m Rp 5,375.00

BAHAN PIPA PPR - PN 10


Pipa PPR - PN 10 diameter 1/2" m' Rp 10,222.50
Pipa PPR - PN 10 diameter 3/4" m' Rp 13,288.75
Pipa PPR - PN 10 diameter 1" m' Rp 21,272.50
Pipa PPR - PN 10 diameter 1 1/4" m' Rp 33,885.00
Pipa PPR - PN 10 diameter 1 1/2" m' Rp 52,700.00
Pipa PPR - PN 10 diameter 2" m' Rp 82,963.75
Pipa PPR - PN 10 diameter 2 1/2" m' Rp 115,866.25

BAHAN PIPA PPR - PN 20


Pipa PPR - PN 20 diameter 1/2" m' Rp 13,590.00
Pipa PPR - PN 20 diameter 3/4" m' Rp 21,021.25
Pipa PPR - PN 20 diameter 1" m' Rp 34,778.75
Pipa PPR - PN 20 diameter 1 1/4" m' Rp 53,910.00
Pipa PPR - PN 20 diameter 1 1/2" m' Rp 85,533.75

BAHAN PIPA GALVANIS


Pipa Galvanis diameter 3/4" m' Rp 35,000.00
Pipa Galvanis diameter 1" m' Rp 54,600.00
Pipa Galvanis diameter 2" m' Rp 111,200.00

BAHAN PIPA BLACK STEEL SCH 40


Pipa Black Stell sch 40 Ø 1 " m Rp 64,333.33
Pipa Black Stell sch 40 Ø 1 1/4" m Rp 85,666.67
Pipa Black Stell sch 40 Ø 1 1/2" m Rp 100,750.00
Pipa Black Stell sch 40 Ø 2 " m Rp 134,166.67
Pipa Black Stell sch 40 Ø 2 1/2 " m Rp 216,375.00
Pipa Black Stell sch 40 Ø 3" m Rp 278,250.00
Pipa Black Stell sch 40 Ø 4" m Rp 401,583.33
Pipa Black Stell sch 40 Ø 5" m Rp 536,833.33
Pipa Black Stell sch 40 Ø 6" m Rp 700,000.00
Pipa Black Stell sch 40 Ø 8" m Rp 1,064,750.00
Pipa Black Stell sch 40 Ø 10" m Rp 1,333,333.33

SANITAIR.
Floor Drain Dia 3 " stainless bh Rp 408,800.00
NO. URAIAN SATUAN HARGA

Roof Drain Dia 4 " besi tuang bh Rp 175,000.00


Roof Drain Dia 3 " besi tuang bh Rp 168,800.00
Stop Kran Dia 3/4 " bh Rp 190,800.00
Stop Kran Dia 1 " bh Rp 260,800.00
Stop Kran Dia 1 1/4 " bh Rp 347,800.00
Stop Kran Dia 1 1/2" bh Rp 468,600.00
Stop Kran Dia 2" bh Rp 770,300.00
Stop kran 2 1/2" bh Rp 1,821,000.00
Stop kran 1/2" bh Rp 175,000.00
Strainer dia. 2,5" bh Rp 518,500.00
Angel Valve 1/2" bh Rp 175,500.00
Angel Valve 3/4" bh Rp 195,550.00
Selenoid Valve 1/2" bh Rp 475,000.00
Floating valve dia.1" bh Rp 823,500.00
Automatic air vent incl. valve dia 1/2" bh Rp 793,000.00
Stainless Steel WLC Probe fixed at Clean Water tank c/w cable bh Rp 915,000.00
Meteran Air Bersih 2" bh Rp 2,500,000.00

Clean Out Dia 4 " Stainless bh Rp 200,000.00


Clean Out Dia 3 " Stainless bh Rp 185,000.00
Clean Out 4 " PVC bh Rp 180,000.00
Clean Out 3 " PVC bh Rp 165,000.00
Clean Out 6 " PVC bh Rp 308,000.00
Vent cup/Mini Vent bh Rp 375,000.00
Kran Taman bh Rp 275,000.00
Kran Air bh Rp 213,700.00
Jet Shower bh
Hand Shower bh
Floating Valve Ø 1 " (Katup Pelampung) bh Rp 437,500.00
Foot Valve Ø 1" bh
Foot Valve Ø 1 1/4" bh
P-trap 2" bh Rp 150,000.00

BAHAN HYDRANT
Check valve 4' bh Rp 12,223,300.00
Check valve 6' bh Rp 18,491,100.00
Check valve 1 1/2' bh Rp 2,457,300.00
Check valve 2' bh Rp 565,250.00
Gate valve 3/4' bh Rp 2,032,300.00
Gate valve 1' bh Rp 2,550,000.00
Gate valve 2 ' bh Rp 5,409,900.00
Gate valve 2 1/2' bh Rp 6,335,400.00
Gate valve 3' bh Rp 9,834,100.00
Gate valve 4' bh Rp 13,254,600.00
Gate valve 5' bh Rp 18,250,000.00
Gate valve 6' bh Rp 25,558,700.00
NO. URAIAN SATUAN HARGA

Flexible joint 5' bh Rp 1,840,400.00


Flexible joint 4' bh Rp 1,360,300.00
Flexible Joint 2.5' bh Rp 810,200.00
Strainer 2,5' bh Rp 7,823,300.00
Strainer 5' bh Rp 26,416,200.00
Foot Valve 2,5' bh Rp 3,184,600.00
Foot Valve 5' bh Rp 6,187,100.00
Safety Valve Ø 3' bh Rp 23,972,200.00
Automatic Air Valve bh Rp 3,312,500.00
Flow meter 3" bh Rp 2,534,700.00
Priming tank 100 liter ( tanki pancingan )+ dudukan bh Rp 2,556,900.00
Pillar hydrant bh Rp 3,681,900.00
Hidrant box outdoor lengkap dgn assessories bh Rp 4,520,700.00
Hidrant box indoor lengkap dgn assessories bh Rp 5,186,800.00
Siamese bh Rp 2,727,300.00
Pompa Hydrant Elektrik Kap. 250 US GPM, head 70 m unit Rp 185,926,000.00
Pompa Hydrant Disel Kap. 250 US GPM, head 70 m unit Rp 232,985,000.00
Motor 37 kW
Jockey Pump 20 lpm head 70 m, motor 3 kW unit Rp 45,000,000.00
pressure tank 500 lt tek. 10 bar bh Rp 16,250,000.00
Pressure Switch bh Rp 1,968,800.00
Pressure gauge bh Rp 142,200.00
Sprinkler bh Rp 100,000.00
Fire Extinguisher 3,5 kg unit Rp 550,000.00
Fire Extinguisher CO2 5 kg unit Rp 1,825,000.00
Fire Extinguisher CO2 23 kg unit Rp 10,950,000.00
Suction Grill unit Rp 479,100.00
Alarm Valve termasuk Alarm Gong unit Rp 26,840,000.00
Safety valve unit Rp 17,080,000.00
Solenoide valves dia. 2" unit Rp 793,000.00
Stainless Steel WLC Probe fixed at HydrantWater tank unit Rp 1,342,000.00
Savety Relief Valve 4" unit Rp 4,270,000.00
Automatic Air Vent dia 2" unit Rp 1,342,000.00
Branch control valve unit Rp 12,500,000.00

PERALATAN
Tandon Atas Roof Tank (Stainless Stell) 4 m3 Unit Rp 15,272,800.00
Tandon Atas Roof Tank (Stainless Stell) 2 m3 Unit Rp 8,727,300.00

Water Heater Unit Unit Rp 8,750,000.00


Type Electric Hot Water Heater
Capacity 100 Ltr

Water Heater Unit Unit Rp 7,750,000.00


Type Electric Hot Water Heater
Capacity 80 Ltr
NO. URAIAN SATUAN HARGA

Water Heater Unit Unit Rp 6,650,000.00


Type Electric Hot Water Heater
Capacity 50 Ltr

Water Heater Unit Unit Rp 2,215,000.00


Type Electric Hot Water Heater
Capacity 15 Ltr

POMPA BOOSTER Unit Rp 122,040,000.00


Merk : Grundfos
Type : Hydro Multi BE 2xCR 3-10
Sistem : Variable speed inverter
Kap : 34 m3/h
Head : 45 m
Header : 4"
Power : 2x@ 3x380V/50Hz
C/W :
2 unit pompa CR 3
- 1 unit panel control
- 1 unit diapraghm tank
- Press transmitter
- Press gauge
- Ball valve, check valve
- Base plate c/w header

DEEP WELL PUMP Unit Rp 36,390,000.00


Merk : Grundfos
Type : SP 5A -21
Jenis : Submersible
Kap : 10 m3/jh
Head : 80 m
Disch : 2"
Power : 3x380V/50Hz
Panel Kontrol Unit Rp 7,500,000.00

TRANSFER PUMP Unit Rp 13,100,000.00


Merk : Grundfos
Type : NF 30
Jenis : Centrifugal
Kap : 20 m3/h
Head : 35 m
Disch : 2,5" x 2"
Power : 3x380V/50Hz
Panel Kontrol Unit Rp 15,000,000.00
NO. URAIAN SATUAN HARGA

SAND FILTER Unit Rp 5,400,000.00


Jenis : FRP
Kap : 4 m3/h
Sistem : Manual back wash

CARBON FILTER Unit Rp 6,400,000.00


Jenis : FRP
Kap : 4 m3/h
Sistem : Manual back wash

SOFTENER FILTER Unit Rp 47,850,000.00


Jenis : FRP
Kap : 10 m3/h
Sistem : Manual back wash

POMPA FILTER Unit Rp 8,750,000.00


Merk : Grundfos
Type : NF 30
Jenis : Centrifugal
Kap : 3 m3/h
Head : 25 m
Disch : 2,5" x 2"
Power : 3x380V/50Hz
Panel Kontrol Unit Rp 15,000,000.00

Pompa Siram Taman Unit Rp 10,200,000.00


Merk : Grundfos
Type : CM 5
Jenis : Centrifugal
Kap : 5 m3/h
Head : 35 m
Disch :1, 25" x 1"
Power : 1x220V/50Hz

Submersible Pump room Pool Unit Rp 6,700,000.00


Merk : Grundfos
Type : GRUNDFOS AP 12.40.06.A1
Kap : 365 Lpm
Head : 12 m
Power : 0,6 kw x220V/50Hz

Pompa Siram Taman Unit Rp 10,200,000.00


Merk : Grundfos
Type : CM 5
Jenis : Centrifugal
Kap : 5 m3/h
NO. URAIAN SATUAN HARGA

Head : 35 m
Disch :1, 25" x 1"
Power : 1x220V/50Hz

Sewage Treatment Plan 5 m3/day Unit Rp 33,000,000.00


System : BIOTECH,
Capasity: 5 m3/day

Sewage Treatment Plan 10 m3/day Unit Rp 60,000,000.00


System : BIOTECH,
Capasity: 10 m3/day

Fire Extinguisher NAF P-IV 3,5 kg bh Rp 6,600,000.00


Fire Extinguisher NAF P-IV 5 kg bh Rp 7,700,000.00
Pompa Boster CM3 bh Rp 42,350,000.00
Pompa Submersible Cap. 80 Lpm Head 12 meter termasuk Panel kon bh Rp 30,550,000.00

SOLAR CELL
Hicell Panel Surya 270 WP unit Rp 3,700,000.00
Inverter On Grid unit Rp 318,200,000.00
Solar Rooftop Mounting System Lot Rp 900,000.00
System Monitoring Wifi Unit Rp 1,500,000.00
Instalastion (PV Cables, AC Cable, MCB) unit Rp 212,700,000.00
Transportasi,Mobilisasi, Akomodasi unit Rp 181,800,000.00

Watertank Sistem Panel Frp unit Rp 82,000,000.00


Kapasitas :10 m3
Ukuran : (5 x 2 x 1,5) m

PANEL
LVMDP BANGUNAN + ATS/AMF unit Rp 92,638,968.00
MDP Bangunan Utama unit Rp 10,961,513.00
PP. Lantai 1 unit Rp 15,632,558.00
PP. Lantai 2 unit Rp 13,941,204.00
PP Outdoor AC unit Rp 8,875,927.00
PP. Outdoor Lighting 1 unit Rp 6,530,352.00
PP. Outdoor Lighting 2 unit Rp 6,704,766.00
PP. Outdoor Lighting 3 unit Rp 6,704,766.00
PP. Outdoor Lighting 4 unit Rp 6,791,958.00
PP. Pompa Air bersih unit Rp 14,148,109.00
PP. Hydrant unit Rp 9,875,927.00
PP. Security unit Rp 1,500,000.00
PP. Stage unit Rp 3,500,000.00
PP. Pool unit Rp 4,500,000.00
PP. Ruang Kontrol unit Rp 2,750,000.00
PP. Parkir unit Rp 1,300,000.00
NO. URAIAN SATUAN HARGA

C ALAT

1 Asphalt Cutter Jam Rp 52,000.00


2 Solar Liter Rp 12,300.00
3 Minyak Pelumas Liter Rp 37,000.00
4 Breaker Jam Rp 310,000.00
5 Concrete Pump Hari Rp 2,880,000.00
6 Dump Truck Jam Rp 412,000.00
7 Sewa forklift Jam Rp 225,000.00
8 Excavator + operator + bbm Jam Rp 868,000.00
9 Jack Hammer Hari Rp 344,000.00
10 Kuas bh Rp 11,000.00
11 Mobil Crane Jam Rp 231,500.00
12 Scaffolding ls Rp 30,000.00
13 Sikat besi bh Rp 15,000.00
14 Trowel Jam Rp 50,000.00
15 Water Tank Truck Jam Rp 357,000.00

16 PVC Foot valve dia. 2" Spring type. unit Rp 475,000.00


17 Floating valve dia.3/4" unit Rp 522,500.00
18 Piping to all pool equipment PVC AW class unit Rp 2,135,980.00
19 Discharge pipe header unit Rp 665,000.00
20 Suction pipe header unit Rp 665,000.00
21 Union joint PVC dia. 2 inch unit Rp 96,900.00
22 Pool Water Circulation pump 2 HP Ex. Hayward unit Rp 13,174,700.00
23 Sand Filter 2 HP ( Ex. Hayward ) unit Rp 17,441,600.00
24 Mixer Amplifier 2x120 (5 Input Mic) unit Rp 5,399,700.00
25 Wooden Rack unit Rp 2,500,000.00

26 Main drain c/w hydrostatic relief valve & collector tube unit Rp 807,500.00
27 Adjustable wall inlet unit Rp 156,750.00
28 Vacuum connection fitting unit Rp 189,050.00
29 S/S Under water pool light LED 12W-12V unit Rp 1,876,250.00
30 Waterproof Transformer 100 W-220V/12V unit Rp 522,500.00
31 Telescopic handle 16 feet unit Rp 427,500.00
32 Vacuum hose 30 feet unit Rp 712,500.00
33 Vacuum head unit Rp 407,550.00
34 Leaf skimmer unit Rp 276,450.00
35 Leaf rack unit Rp 201,400.00
36 Wall brush unit Rp 147,250.00
37 Corner brush unit Rp 152,950.00
38 Algae brush (stainless steel) unit Rp 209,000.00
39 Multi Test kit unit Rp 216,600.00
40 Buis Beton dia. 80cm x 100cm unit Rp 650,000.00
41 Proj. VIEWSONIC 3600 AL unit Rp 6,300,000.00
NO. URAIAN SATUAN HARGA

42 Screen Motorized 178 x 178 unit Rp 3,500,000.00


43 Braket unit Rp 500,000.00
44 Fibaro Home Centre System unit Rp 19,550,000.00
45 Fibaro Dimmer 2 unit Rp 1,700,000.00
46 IR Blaster For AC unit Rp 2,200,000.00
47 Fibaro Single Switch unit Rp 1,700,000.00
48 Fibaro Door Window Sensor unit Rp 1,700,000.00
49 Fibaro Key FOB unit Rp 1,700,000.00
50 Wireless Handheld Mic w/ Receiver WS-5225 unit Rp 8,056,000.00
51 Wireless Antenna unit Rp 2,432,000.00
52 Desk Stand Mic unit Rp 350,000.00
53 Wireless Antenna unit Rp 2,432,000.00
54 2-Way Ceiling Speaker 60 W Z-2852C unit Rp 1,704,000.00
55 Graphic Equalizer unit Rp 6,600,000.00
56 Slim Array Speaker unit Rp 8,740,000.00
57 Digital Amplifier unit Rp 8,513,000.00
ANALISA ELEKTRIKAL

Uraian Pekerjaan : Pemasangan LVMDP + ATS/AMF


Satuan : Unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 8.000 101,500.00 812,000.00
Tukang Listrik o.h 8.000 120,600.00 964,800.00
Kepala Tukang Listrik o.h 4.000 132,100.00 528,400.00
Mandor o.h 1.000 158,000.00 158,000.00
Tenaga Ahli Elektrikal o.h 1.000 744,800.00 744,800.00

B BAHAN
MCCB 3P / 350 A Unit 1.000 9,478,000.00 9,478,000.00
MCCB 3P / 80 A Unit 2.000 1,524,600.00 3,049,200.00
MCB 3P / 25 A Unit 6.000 691,650.00 4,149,900.00
MCB 3 P / 35 A Unit 1.000 691,650.00 691,650.00
MCB 3 P / 16 A Unit 1.000 691,650.00 691,650.00
MCB 3 P / 50 A Unit 1.000 691,650.00 691,650.00
Pilot Lamp bh 3.000 38,430.00 115,290.00
Fuse Control 2A bh 3.000 164,700.00 494,100.00
Curent Trafo 300/5, 250/5, 200/5 bh 3.000 126,672.00 380,016.00
Digital Power Meter 820 bh 1.000 300,000.00 300,000.00
Busbar Cu Cap. 300A ls 1.000 2,509,650.00 2,509,650.00
Box Panel Uk. 180 x 80 x 60 bh 1.000 7,826,000.00 7,826,000.00
accessories ls 1.000 390,000.00 390,000.00
internal wiring ls 1.000 1,950,000.00 1,950,000.00

C ALAT

D TOTAL (A+B+C) 35,925,106.00


E Overhead & Profit 0% 0.00
TOTAL 35,925,106.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 35,925,100.00

Uraian Pekerjaan : Pemasangan Panel Toko


Satuan : Unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 8.000 101,500.00 812,000.00
Tukang Listrik o.h 8.000 120,600.00 964,800.00
Kepala Tukang Listrik o.h 4.000 132,100.00 528,400.00
Mandor o.h 1.000 158,000.00 158,000.00
Tenaga Ahli Elektrikal o.h 1.000 744,800.00 744,800.00

B BAHAN
MCB 3P / 25 A Unit 1.000 691,650.00 691,650.00
MCB 3P / 6 A Unit 9.000 691,650.00 6,224,850.00
MCB 3P / 10 A Unit 3.000 691,650.00 2,074,950.00
Pilot Lamp bh 4.000 38,430.00 153,720.00
Fuse Control 2A bh 1.000 164,700.00 164,700.00
Box Panel Uk. 60 x 40 x 20 bh 1.000 2,500,000.00 2,500,000.00
accessories ls 3.000 38,430.00 115,290.00
internal wiring ls 3.000 164,700.00 494,100.00

C ALAT

D TOTAL (A+B+C) 15,627,260.00


E Overhead & Profit 0% 0.00
TOTAL 15,627,260.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 15,627,260.00
Uraian Pekerjaan : Pemasangan Panel Patung
Satuan : Unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 8.000 101,500.00 812,000.00
Tukang Listrik o.h 8.000 120,600.00 964,800.00
Kepala Tukang Listrik o.h 4.000 132,100.00 528,400.00
Mandor o.h 1.000 158,000.00 158,000.00
Tenaga Ahli Elektrikal o.h 1.000 744,800.00 744,800.00

B BAHAN
MCB 3P / 80 A Unit 1.000 1,524,600.00 1,524,600.00
MCB 3P / 16 A Unit 3.000 691,650.00 2,074,950.00
MCB 3P / 25 A Unit 3.000 691,650.00 2,074,950.00
Pilot Lamp bh 4.000 38,430.00 153,720.00
Fuse Control 2A bh 1.000 164,700.00 164,700.00
Box Panel Uk. 60 x 40 x 20 bh 1.000 2,500,000.00 2,500,000.00
accessories ls 3.000 38,430.00 115,290.00
internal wiring ls 3.000 164,700.00 494,100.00

C ALAT

D TOTAL (A+B+C) 12,310,310.00


E Overhead & Profit 0% 0.00
TOTAL 12,310,310.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 12,310,310.00

Uraian Pekerjaan : Pemasangan Panel Panggung / Stage


Satuan : Unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 8.000 101,500.00 812,000.00
Tukang Listrik o.h 8.000 120,600.00 964,800.00
Kepala Tukang Listrik o.h 4.000 132,100.00 528,400.00
Mandor o.h 1.000 158,000.00 158,000.00
Tenaga Ahli Elektrikal o.h 1.000 744,800.00 744,800.00

B BAHAN
MCB 3P / 80 A Unit 1.000 1,524,600.00 1,524,600.00
MCB 3P / 16 A Unit 6.000 691,650.00 4,149,900.00
MCB 3P / 25 A Unit 3.000 691,650.00 2,074,950.00
Pilot Lamp bh 4.000 38,430.00 153,720.00
Fuse Control 2A bh 1.000 164,700.00 164,700.00
Box Panel Uk. 60 x 40 x 20 bh 1.000 2,500,000.00 2,500,000.00
accessories ls 3.000 38,430.00 115,290.00
internal wiring ls 3.000 164,700.00 494,100.00

C ALAT

D TOTAL (A+B+C) 14,385,260.00


E Overhead & Profit 0% 0.00
TOTAL 14,385,260.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 14,385,260.00
Uraian Pekerjaan : Pemasangan Panel Lampu Taman
Satuan : Unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 8.000 101,500.00 812,000.00
Tukang Listrik o.h 8.000 120,600.00 964,800.00
Kepala Tukang Listrik o.h 4.000 132,100.00 528,400.00
Mandor o.h 1.000 158,000.00 158,000.00
Tenaga Ahli Elektrikal o.h 1.000 744,800.00 744,800.00

B BAHAN
MCB 3P / 25 A Unit 1.000 691,650.00 691,650.00
MCB 1P / 16 A Unit 6.000 113,175.00 679,050.00
Pilot Lamp bh 4.000 38,430.00 153,720.00
Fuse Control 2A bh 1.000 164,700.00 164,700.00
Box Panel Uk. 60 x 40 x 20 bh 1.000 2,500,000.00 2,500,000.00
accessories ls 3.000 38,430.00 115,290.00
internal wiring ls 3.000 164,700.00 494,100.00

C ALAT

D TOTAL (A+B+C) 8,006,510.00


E Overhead & Profit 0% 0.00
TOTAL 8,006,510.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 8,006,510.00

Uraian Pekerjaan : Penarikan 1 m Kabel Feeder NYY 2 x ( 4 x 1 x 120 mm2 )


Satuan : m
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.055 101,500.00 5,582.50
Tukang listrik o.h 0.022 120,600.00 2,653.20
Kepala tukang o.h 0.100 147,900.00 14,790.00
Mandor o.h 0.100 158,000.00 15,800.00

B BAHAN
Kabel NYY 2 x ( 4 x 1 x 120 mm2) m' 2.200 879,000.00 1,933,800.00

C ALAT

D TOTAL (A+B+C) 1,972,625.70


E Overhead & Profit 0% 0.00
TOTAL 1,972,625.70
HARGA SATUAN PEKERJAAN (DIBULATKAN) 1,972,620.00
Uraian Pekerjaan : Penarikan 1 m Kabel Feeder NYFGBY 4 x 16 mm2
Satuan : m
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.055 101,500.00 5,582.50
Tukang listrik o.h 0.022 120,600.00 2,653.20
Kepala tukang o.h 0.100 147,900.00 14,790.00
Mandor o.h 0.100 158,000.00 15,800.00

B BAHAN
NYFGBY 4 x 16 mm2 m' 1.100 144,500.00 158,950.00

C ALAT

D TOTAL (A+B+C) 197,775.70


E Overhead & Profit 0% 0.00
TOTAL 197,775.70
HARGA SATUAN PEKERJAAN (DIBULATKAN) 197,770.00

Uraian Pekerjaan : Penarikan 1 m Kabel Feeder NYFGBY 4 x 10 mm2


Satuan : m
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.055 101,500.00 5,582.50
Tukang listrik o.h 0.022 120,600.00 2,653.20
Kepala tukang o.h 0.100 147,900.00 14,790.00
Mandor o.h 0.100 158,000.00 15,800.00

B BAHAN
NYFGBY 4 x 10 mm2 m' 1.100 86,000.00 94,600.00

C ALAT

D TOTAL (A+B+C) 133,425.70


E Overhead & Profit 0% 0.00
TOTAL 133,425.70
HARGA SATUAN PEKERJAAN (DIBULATKAN) 133,420.00
Uraian Pekerjaan : Penarikan 1 m Kabel Feeder NYFGBY 4 x 25 mm2
Satuan : m
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.055 101,500.00 5,582.50
Tukang listrik o.h 0.022 120,600.00 2,653.20
Kepala tukang o.h 0.100 147,900.00 14,790.00
Mandor o.h 0.100 158,000.00 15,800.00

B BAHAN
NYFGBY 4 x 25 mm2 m' 1.100 225,000.00 247,500.00

C ALAT

D TOTAL (A+B+C) 286,325.70


E Overhead & Profit 0% 0.00
TOTAL 286,325.70
HARGA SATUAN PEKERJAAN (DIBULATKAN) 286,320.00

Uraian Pekerjaan : Penarikan 1 m Kabel Feeder NYFGBY 4 x 35 mm2


Satuan : m
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.055 101,500.00 5,582.50
Tukang listrik o.h 0.022 120,600.00 2,653.20
Kepala tukang o.h 0.100 147,900.00 14,790.00
Mandor o.h 0.100 158,000.00 15,800.00

B BAHAN
NYFGBY 4 x 35 mm2 m' 1.100 289,000.00 317,900.00

C ALAT

D TOTAL (A+B+C) 356,725.70


E Overhead & Profit 0% 0.00
TOTAL 356,725.70
HARGA SATUAN PEKERJAAN (DIBULATKAN) 356,720.00
Uraian Pekerjaan : Instalasi Penerangan / Lampu / ttk
Satuan : unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.200 101,500.00 20,300.00
Tukang listrik o.h 0.040 120,600.00 4,824.00
Kepala tukang o.h 0.200 147,900.00 29,580.00
Mandor o.h 0.200 158,000.00 31,600.00

B BAHAN

Kabel NYM 3x2.5 mm m' 10.000 15,800.00 158,000.00


PVC Conduit 20 mm m' 10.000 3,350.00 33,500.00
Klem Pipa Conduit bh 9.000 400.00 3,600.00
T.Doost 1'' bh 1.000 1,800.00 1,800.00
Socket Conduit 1'' bh 4.000 500.00 2,000.00
Fisher bh 30.000 100.00 3,000.00

C ALAT

D TOTAL (A+B+C) 288,204.00


E Overhead & Profit 0% 0.00
TOTAL 288,204.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 288,200.00

Uraian Pekerjaan : Instalasi Penerangan / Lampu taman / ttk (NYFGBY 3 x 2,5 mm)
Satuan : Titik
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.200 101,500.00 20,300.00
Tukang listrik o.h 0.040 120,600.00 4,824.00
Kepala tukang o.h 0.200 147,900.00 29,580.00
Mandor o.h 0.200 158,000.00 31,600.00

B BAHAN
Kabel NYFGBY 3x2.5 mm m' 25.000 27,000.00 675,000.00

C ALAT

D TOTAL (A+B+C) 761,304.00


E Overhead & Profit 0% 0.00
TOTAL 761,304.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 761,300.00
Uraian Pekerjaan : Instalasi Penerangan / Lampu taman / ttk (NYFGBY 3 x 4 mm)
Satuan : Titik
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.200 101,500.00 20,300.00
Tukang listrik o.h 0.040 120,600.00 4,824.00
Kepala tukang o.h 0.200 147,900.00 29,580.00
Mandor o.h 0.200 158,000.00 31,600.00

B BAHAN
Kabel NYFGBY 3x2.5 mm m' 25.000 37,000.00 925,000.00

C ALAT

D TOTAL (A+B+C) 1,011,304.00


E Overhead & Profit 0% 0.00
TOTAL 1,011,304.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 1,011,300.00

Uraian Pekerjaan : Pemasangan Lampu Spot 150 Watt


Satuan : unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.350 87,600.00 30,660.00
Tukang listrik o.h 0.250 98,550.00 24,637.50
Kepala tukang o.h 0.025 104,000.00 2,600.00
Mandor o.h 0.050 136,875.00 6,843.75

B BAHAN
Lampu Spot 150 Watt unit 1.000 340,000.00 340,000.00

C ALAT

D TOTAL (A+B+C) 404,747.25


E Overhead & Profit 0% 0.00
TOTAL 404,747.25
HARGA SATUAN PEKERJAAN (DIBULATKAN) 404,740.00
Uraian Pekerjaan : Pemasangan Lampu Spot 400 Watt
Satuan : unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.350 87,600.00 30,660.00
Tukang listrik o.h 0.250 98,550.00 24,637.50
Kepala tukang o.h 0.025 104,000.00 2,600.00
Mandor o.h 0.050 136,875.00 6,843.75

B BAHAN
Lampu Spot 400 Watt unit 1.000 840,000.00 840,000.00

C ALAT

D TOTAL (A+B+C) 904,747.25


E Overhead & Profit 0% 0.00
TOTAL 904,747.25
HARGA SATUAN PEKERJAAN (DIBULATKAN) 904,740.00

Uraian Pekerjaan : Pemasangan Lampu Spot 1000 Watt


Satuan : unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.350 87,600.00 30,660.00
Tukang listrik o.h 0.250 98,550.00 24,637.50
Kepala tukang o.h 0.025 104,000.00 2,600.00
Mandor o.h 0.050 136,875.00 6,843.75

B BAHAN
Lampu Spot 1000 Watt unit 1.000 1,600,000.00 1,600,000.00

C ALAT

D TOTAL (A+B+C) 1,664,747.25


E Overhead & Profit 0% 0.00
TOTAL 1,664,747.25
HARGA SATUAN PEKERJAAN (DIBULATKAN) 1,664,740.00
Uraian Pekerjaan : Pemasangan Lampu Spot 3000 Watt
Satuan : unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.350 87,600.00 30,660.00
Tukang listrik o.h 0.250 98,550.00 24,637.50
Kepala tukang o.h 0.025 104,000.00 2,600.00
Mandor o.h 0.050 136,875.00 6,843.75

B BAHAN
Lampu Spot 3000 Watt unit 1.000 31,100,000.00 31,100,000.00

C ALAT

D TOTAL (A+B+C) 31,164,747.25


E Overhead & Profit 0% 0.00
TOTAL 31,164,747.25
HARGA SATUAN PEKERJAAN (DIBULATKAN) 31,164,740.00

Uraian Pekerjaan : Pemasangan Lampu TL RMI 2 x 18 Watt


Satuan : unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.350 101,500.00 35,525.00
Tukang listrik o.h 0.250 120,600.00 30,150.00
Kepala tukang o.h 0.025 147,900.00 3,697.50
Mandor o.h 0.050 158,000.00 7,900.00

B BAHAN
Lampu TL RMI 2 x 19 Watt unit 1.000 450,000.00 450,000.00

C ALAT

D TOTAL (A+B+C) 527,272.50


E Overhead & Profit 0% 0.00
TOTAL 527,272.50
HARGA SATUAN PEKERJAAN (DIBULATKAN) 527,270.00
Uraian Pekerjaan : Pekerjaan 1 Unit Downlight 13 W
Satuan : unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.350 101,500.00 35,525.00
Tukang listrik o.h 0.250 120,600.00 30,150.00
Kepala tukang o.h 0.025 147,900.00 3,697.50
Mandor o.h 0.050 158,000.00 7,900.00

B BAHAN
Downlight 13 W unit 1.000 145,000.00 145,000.00

C ALAT

D TOTAL (A+B+C) 222,272.50


E Overhead & Profit 0% 0.00
TOTAL 222,272.50
HARGA SATUAN PEKERJAAN (DIBULATKAN) 222,270.00

Uraian Pekerjaan : Pekerjaan Lampu Taman 2 Cabang


Satuan : unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.350 87,600.00 30,660.00
Tukang listrik o.h 0.250 98,550.00 24,637.50
Kepala tukang o.h 0.025 104,000.00 2,600.00
Mandor o.h 0.050 136,875.00 6,843.75

B BAHAN
Lampu Tiang 2 Cabang 2 x 14,5 Watt Mtr 1.000 2,950,000.00 2,950,000.00

C ALAT

D TOTAL (A+B+C) 3,014,747.25


E Overhead & Profit 0% 0.00
TOTAL 3,014,747.25
HARGA SATUAN PEKERJAAN (DIBULATKAN) 3,014,740.00
Uraian Pekerjaan : Pemasangan 1 Unit Saklar tunggal
Satuan : unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.100 101,500.00 10,150.00
Tukang listrik o.h 0.100 120,600.00 12,060.00
Kepala tukang o.h 0.050 147,900.00 7,395.00
Mandor o.h 0.025 158,000.00 3,950.00

B BAHAN
Saklar tunggal / saklar engkel unit 1.000 12,670.00 12,670.00

C ALAT

D TOTAL (A+B+C) 46,225.00


E Overhead & Profit 0% 0.00
TOTAL 46,225.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 46,220.00

Uraian Pekerjaan : Pemasangan 1 Unit Saklar Ganda 2 Gang


Satuan : unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.100 101,500.00 10,150.00
Tukang listrik o.h 0.100 120,600.00 12,060.00
Kepala tukang o.h 0.050 147,900.00 7,395.00
Mandor o.h 0.025 158,000.00 3,950.00

B BAHAN
Saklar ganda ( saklar seri ) unit 1.000 16,000.00 16,000.00

C ALAT

D TOTAL (A+B+C) 49,555.00


E Overhead & Profit 0% 0.00
TOTAL 49,555.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 49,550.00
Uraian Pekerjaan : Pemasangan 1 Unit Stop Kontak 1 Phase
Satuan : unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.100 101,500.00 10,150.00
Tukang listrik o.h 0.100 120,600.00 12,060.00
Kepala tukang o.h 0.050 147,900.00 7,395.00
Mandor o.h 0.025 158,000.00 3,950.00

B BAHAN
Stop kontak dinding 1 phase unit 1.000 14,670.00 14,670.00

C ALAT

D TOTAL (A+B+C) 48,225.00


E Overhead & Profit 0% 0.00
TOTAL 48,225.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 48,220.00

Uraian Pekerjaan : Pemasangan 1 Unit Stop Kontak Weather Proof


Satuan : unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.100 101,500.00 10,150.00
Tukang listrik o.h 0.100 120,600.00 12,060.00
Kepala tukang o.h 0.050 147,900.00 7,395.00
Mandor o.h 0.025 158,000.00 3,950.00

B BAHAN
Stop kontak dinding Weather Proof unit 1.000 36,670.00 36,670.00

C ALAT

D TOTAL (A+B+C) 70,225.00


E Overhead & Profit 0% 0.00
TOTAL 70,225.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 70,220.00
Uraian Pekerjaan : Pemasangan 1 Titik Instalasi Stop Kontak
Satuan : unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.200 101,500.00 20,300.00
Tukang listrik o.h 0.040 120,600.00 4,824.00
Kepala tukang o.h 0.200 147,900.00 29,580.00
Mandor o.h 0.200 158,000.00 31,600.00

B BAHAN
Kabel NYM 3 x 2,5 mm m 12.000 15,800.00 189,600.00
Pipa Listrik 20 mm m 12.000 5,250.00 63,000.00
sock/klem conduit 20mm m 10.000 400.00 4,000.00
T.Doost 1'' bh 1.000 1,800.00 1,800.00
Socket Conduit 1'' bh 4.000 500.00 2,000.00
Fisher bh 30.000 100.00 3,000.00

C ALAT

D TOTAL (A+B+C) 349,704.00


E Overhead & Profit 0% 0.00
TOTAL 349,704.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 349,700.00

Uraian Pekerjaan : Pemasangan Lampu Industri HPZ 150 W


Satuan : unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.350 101,500.00 35,525.00
Tukang listrik o.h 0.250 120,600.00 30,150.00
Kepala tukang o.h 0.025 147,900.00 3,697.50
Mandor o.h 0.050 158,000.00 7,900.00

B BAHAN
Lampu HPZ 150 W unit 1.000 343,000.00 343,000.00

C ALAT

D TOTAL (A+B+C) 420,272.50


E Overhead & Profit 0% 0.00
TOTAL 420,272.50
HARGA SATUAN PEKERJAAN (DIBULATKAN) 420,270.00
Uraian Pekerjaan : Pemasangan Lampu Taman Cabang 2
Satuan : unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.350 101,500.00 35,525.00
Tukang listrik o.h 0.250 120,600.00 30,150.00
Kepala tukang o.h 0.025 147,900.00 3,697.50
Mandor o.h 0.050 158,000.00 7,900.00

B BAHAN
Lampu Taman Cabang 2 unit 1.000 2,100,000.00 2,100,000.00

C ALAT

D TOTAL (A+B+C) 2,177,272.50


E Overhead & Profit 0% 0.00
TOTAL 2,177,272.50
HARGA SATUAN PEKERJAAN (DIBULATKAN) 2,177,270.00

Uraian Pekerjaan : Pemasangan Lampu Taman Bulat


Satuan : unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.350 101,500.00 35,525.00
Tukang listrik o.h 0.250 120,600.00 30,150.00
Kepala tukang o.h 0.025 147,900.00 3,697.50
Mandor o.h 0.050 158,000.00 7,900.00

B BAHAN
Lampu Taman Bulat unit 1.000 545,000.00 545,000.00

C ALAT

D TOTAL (A+B+C) 622,272.50


E Overhead & Profit 0% 0.00
TOTAL 622,272.50
HARGA SATUAN PEKERJAAN (DIBULATKAN) 622,270.00
Uraian Pekerjaan : Pemasangan Lampu Jogging Track
Satuan : unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.350 101,500.00 35,525.00
Tukang listrik o.h 0.250 120,600.00 30,150.00
Kepala tukang o.h 0.025 147,900.00 3,697.50
Mandor o.h 0.050 158,000.00 7,900.00

B BAHAN
Lampu Jogging Track unit 1.000 215,000.00 215,000.00

C ALAT

D TOTAL (A+B+C) 292,272.50


E Overhead & Profit 0% 0.00
TOTAL 292,272.50
HARGA SATUAN PEKERJAAN (DIBULATKAN) 292,270.00

Uraian Pekerjaan : Pemasangan 1 Unit Network Video Recorder (NVR) 32 Channel HDD 2 TB, include
Satuan : unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 1.000 101,500.00 101,500.00
Tukang listrik o.h 0.100 120,600.00 12,060.00
Kepala tukang o.h 0.050 147,900.00 7,395.00
Mandor o.h 0.500 158,000.00 79,000.00

B BAHAN
Network Video Recorder (NVR) 32 Channel HDD 2 TB, include unit 1.000 8,750,000.00 8,750,000.00

C ALAT

D TOTAL (A+B+C) 8,949,955.00


E Overhead & Profit 0% 0.00
TOTAL 8,949,955.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 8,949,950.00
Uraian Pekerjaan : Pemasangan 1 Unit LCD Display 32"
Satuan : unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 1.000 101,500.00 101,500.00
Tukang listrik o.h 0.100 120,600.00 12,060.00
Kepala tukang o.h 0.050 147,900.00 7,395.00
Mandor o.h 0.500 158,000.00 79,000.00

B BAHAN
LCD Display 32" unit 1.000 4,500,000.00 4,500,000.00

C ALAT

D TOTAL (A+B+C) 4,699,955.00


E Overhead & Profit 0% 0.00
TOTAL 4,699,955.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 4,699,950.00

Uraian Pekerjaan : Pemasangan 1 Unit UPS 1500 Va


Satuan : unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 1.000 101,500.00 101,500.00
Tukang listrik o.h 0.100 120,600.00 12,060.00
Kepala tukang o.h 0.050 147,900.00 7,395.00
Mandor o.h 0.500 158,000.00 79,000.00

B BAHAN
LCD Display 32" unit 1.000 3,500,000.00 3,500,000.00

C ALAT

D TOTAL (A+B+C) 3,699,955.00


E Overhead & Profit 0% 0.00
TOTAL 3,699,955.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 3,699,950.00
Uraian Pekerjaan : Pemasangan 1 Titik Instalasi CCTV
Satuan : unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.500 101,500.00 50,750.00
Tukang listrik o.h 0.500 120,600.00 60,300.00
Kepala tukang o.h 0.050 147,900.00 7,395.00
Mandor o.h 0.005 158,000.00 790.00

B BAHAN
Kabel Coaxial RG 6 m' 25.000 17,100.00 427,500.00
PVC Conduit 20 mm m' 25.000 3,350.00 83,750.00
Klem Pipa Conduit bh 20.000 400.00 8,000.00
T.Doost 1'' bh 1.000 1,800.00 1,800.00
Socket Conduit 1'' bh 10.000 500.00 5,000.00
Fisher bh 40.000 100.00 4,000.00

C ALAT

D TOTAL (A+B+C) 649,285.00


E Overhead & Profit 0% 0.00
TOTAL 649,285.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 649,280.00

Uraian Pekerjaan : Pemasangan 1 Bh CCTV Type 4MP HBW4PER1 IP


Satuan : bh
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 1.000 101,500.00 101,500.00
Tukang listrik o.h 0.100 120,600.00 12,060.00
Kepala tukang o.h 0.050 147,900.00 7,395.00
Mandor o.h 0.500 158,000.00 79,000.00

B BAHAN
CCTV Type 4MP HBW4PER1 IP bh 1.000 5,264,000.00 5,264,000.00

C ALAT

D TOTAL (A+B+C) 5,463,955.00


E Overhead & Profit 0% 0.00
TOTAL 5,463,955.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 5,463,950.00
Uraian Pekerjaan : Pemasangan 1 Unit Penangkal Petir (R=150 m)
Satuan : bh
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Jasa Pemasangan o.h 1.000 1,500,000.00 1,500,000.00

B BAHAN
Penangkal Petir (R=150 m) Unit 1.000 10,300,000.00 10,300,000.00
- Unit Head Terminal KURN R150 (Original)
- Tiang Penyangga Galvanis + Accessories
- 2 batang Pipa PVC
- Copper Rod Full Tembaga 5/8
- Kabel BC 50mm
- Jasa Grounding
- Control Box

C ALAT

D TOTAL (A+B+C) 11,800,000.00


E Overhead & Profit 0% 0.00
TOTAL 11,800,000.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 11,800,000.00

Uraian Pekerjaan : Pemasangan 1 Bh Fire Extinguisher 5 kg, ABC


Satuan : bh
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Jasa Pemasangan ls 1.000 50,000.00 50,000.00

B BAHAN
Fire Extinguisher 5 kg, ABC bh 1.000 575,000.00 575,000.00

C ALAT

D TOTAL (A+B+C) 625,000.00


E Overhead & Profit 0% 0.00
TOTAL 625,000.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 625,000.00
Uraian Pekerjaan : Penyambungan Daya PLN 66 kVa
Satuan : bh
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan Daya 66 kVa Unit 1.000 63,954,000.00 63,954,000.00
- BP
- UJL
- SLO

B BAHAN

C ALAT

D TOTAL (A+B+C) 63,954,000.00


E Overhead & Profit 0% 0.00
TOTAL 63,954,000.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 63,954,000.00

Uraian Pekerjaan : Pekerjaan 1 Unit Genzet 131 kVa Cummins (Silent Type) Komplit
Satuan : bh
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 2,000,000.00 2,000,000.00

B BAHAN
Genzet 131 kVA cummins Silent Type Unit 1.000 235,000,000.00 235,000,000.00
(Komplit)

C ALAT

D TOTAL (A+B+C) 237,000,000.00


E Overhead & Profit 0% 0.00
TOTAL 237,000,000.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 237,000,000.00
Uraian Pekerjaan : Pemasangan Lampu Kapal
Satuan : unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.350 87,600.00 30,660.00
Tukang listrik o.h 0.250 98,550.00 24,637.50
Kepala tukang o.h 0.025 104,000.00 2,600.00
Mandor o.h 0.050 136,875.00 6,843.75

B BAHAN
Lampu Kapal unit 1.000 95,000.00 95,000.00

C ALAT

D TOTAL (A+B+C) 159,747.25


E Overhead & Profit 0% 0.00
TOTAL 159,747.25
HARGA SATUAN PEKERJAAN (DIBULATKAN) 159,740.00

Uraian Pekerjaan : Pemasangan Lampu SL


Satuan : unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.350 87,600.00 30,660.00
Tukang listrik o.h 0.250 98,550.00 24,637.50
Kepala tukang o.h 0.025 104,000.00 2,600.00
Mandor o.h 0.050 136,875.00 6,843.75

B BAHAN
Lampu SL unit 1.000 35,000.00 35,000.00

C ALAT

D TOTAL (A+B+C) 99,747.25


E Overhead & Profit 0% 0.00
TOTAL 99,747.25
HARGA SATUAN PEKERJAAN (DIBULATKAN) 99,740.00

Uraian Pekerjaan : Pemasangan Tangki Bahan Bakar Genzet 2000 L


Satuan : unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Jasa Pemasangan Ls 1 200,000.00 200,000.00

B BAHAN
Tangki Bahan Bakar Genzet unit 1.000 23,500,000.00 23,500,000.00
C ALAT

D TOTAL (A+B+C) 23,700,000.00


E Overhead & Profit 0% 0.00
TOTAL 23,700,000.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 23,700,000.00

Uraian Pekerjaan : Instalasi Pemipaan Bahan Bakar Genzet


Satuan : lot
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Jasa Pemasangan Ls 1 150,000.00 150,000.00

B BAHAN
Pipa Bahan Bakar unit 1.000 6,700,000.00 6,700,000.00

C ALAT

D TOTAL (A+B+C) 6,850,000.00


E Overhead & Profit 0% 0.00
TOTAL 6,850,000.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 6,850,000.00

Uraian Pekerjaan : Pekerjaan Pompa Bahan Bakar Electric


Satuan : Unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Jasa Pemasangan Ls 1 200,000.00 200,000.00

B BAHAN
Pompa Bahan Bakar unit 1.000 20,125,000.00 20,125,000.00

C ALAT

D TOTAL (A+B+C) 20,325,000.00


E Overhead & Profit 0% 0.00
TOTAL 20,325,000.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 20,325,000.00

Uraian Pekerjaan : Pekerjaan Panel Pompa Bahan Bakar


Satuan : Unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Jasa Pemasangan Ls 1 100,000.00 100,000.00

B BAHAN
Pompa Bahan Bakar unit 1.000 3,900,000.00 3,900,000.00
C ALAT

D TOTAL (A+B+C) 4,000,000.00


E Overhead & Profit 0% 0.00
TOTAL 4,000,000.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 4,000,000.00

Uraian Pekerjaan : Pekerjaan Pompa Manual Bahan Bakar


Satuan : Unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Jasa Pemasangan Ls 1 100,000.00 100,000.00

B BAHAN
Pompa Manual Bahan Bakar unit 1.000 6,850,000.00 6,850,000.00

C ALAT

D TOTAL (A+B+C) 6,950,000.00


E Overhead & Profit 0% 0.00
TOTAL 6,950,000.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 6,950,000.00

Uraian Pekerjaan : Pekerjaan Load Bank Test


Satuan : lot
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Jasa Pemasangan Ls 1 100,000.00 100,000.00

B BAHAN
Load Bank Test Lot 1.000 13,000,000.00 13,000,000.00

C ALAT

D TOTAL (A+B+C) 13,100,000.00


E Overhead & Profit 0% 0.00
TOTAL 13,100,000.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 13,100,000.00
ANALISA MEKANIKAL DAN PLUMBING

Uraian Pekerjaan : Pemasangan 1 m pipa PVC tipe AW dia.150/ 6"


Satuan : m'
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.500 101,500.00 50,750.00
Tukang o.h 0.250 133,600.00 33,400.00
Kepala tukang o.h 0.125 147,900.00 18,487.50
Mandor o.h 0.063 158,000.00 9,875.00

B BAHAN
Pipa PVC AW Ø 6 " m 1.200 174,200.00 209,040.00
Perlengkapan % 0.350 174,200.00 60,970.00

C ALAT

D TOTAL (A+B+C) 382,522.50


E Overhead & Profit 0% 0.00
TOTAL 382,522.50
HARGA SATUAN PEKERJAAN (DIBULATKAN) 382,520.00

Uraian Pekerjaan : Pemasangan 1 m pipa PVC tipe AW dia.100/ 5"


Satuan : m'
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.200 101,500.00 20,300.00
Tukang o.h 0.125 133,600.00 16,700.00
Kepala tukang o.h 0.050 147,900.00 7,395.00
Mandor o.h 0.025 158,000.00 3,950.00

B BAHAN
Pipa PVC AW Ø 5" m 1.200 125,583.33 150,700.00
Perlengkapan % 0.350 125,583.33 43,954.17

C ALAT

D TOTAL (A+B+C) 242,999.17


E Overhead & Profit 0% 0.00
TOTAL 242,999.17
HARGA SATUAN PEKERJAAN (DIBULATKAN) 242,990.00
Uraian Pekerjaan : Pemasangan 1 m pipa PVC tipe AW dia.100/ 4"
Satuan : m'
Referensi : AHSP PUPR 2016, Hal 198

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.081 101,500.00 8,221.50
Tukang o.h 0.135 133,600.00 18,036.00
Kepala tukang o.h 0.014 147,900.00 1,996.65
Mandor o.h 0.004 158,000.00 632.00

B BAHAN
Pipa PVC AW Ø 4" m 1.200 79,850.00 95,820.00
Perlengkapan % 0.350 79,850.00 27,947.50

C ALAT

D TOTAL (A+B+C) 152,653.65


E Overhead & Profit 0% 0.00
TOTAL 152,653.65
HARGA SATUAN PEKERJAAN (DIBULATKAN) 152,650.00

Uraian Pekerjaan : Pemasangan 1 m pipa PVC tipe AW dia. 80/ 3"


Satuan : m'
Referensi : AHSP PUPR 2016, Hal 197

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.081 101,500.00 8,221.50
Tukang o.h 0.135 133,600.00 18,036.00
Kepala tukang o.h 0.014 147,900.00 1,996.65
Mandor o.h 0.004 158,000.00 632.00

B BAHAN
Pipa PVC AW Ø 3 " m 1.200 49,683.33 59,620.00
Perlengkapan % 0.350 49,683.33 17,389.17

C ALAT

D TOTAL (A+B+C) 105,895.32


E Overhead & Profit 0% 0.00
TOTAL 105,895.32
HARGA SATUAN PEKERJAAN (DIBULATKAN) 105,890.00
Uraian Pekerjaan : Pemasangan 1 m pipa PVC tipe AW dia. 65/ 2,5"
Satuan : m'
Referensi : AHSP PUPR 2016, Hal 197

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.081 101,500.00 8,221.50
Tukang o.h 0.135 133,600.00 18,036.00
Kepala tukang o.h 0.014 147,900.00 1,996.65
Mandor o.h 0.004 158,000.00 632.00

B BAHAN
Pipa PVC AW Ø 2 1/2 " m 1.200 35,233.33 42,280.00
Perlengkapan % 0.350 35,233.33 12,331.67

C ALAT

D TOTAL (A+B+C) 83,497.82


E Overhead & Profit 0% 0.00
TOTAL 83,497.82
HARGA SATUAN PEKERJAAN (DIBULATKAN) 83,490.00

Uraian Pekerjaan : Pemasangan 1 m pipa PVC tipe AW dia. 50/ 2"


Satuan : m'
Referensi : AHSP PUPR 2016, Hal 196

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.054 101,500.00 5,481.00
Tukang o.h 0.090 133,600.00 12,024.00
Kepala tukang o.h 0.009 147,900.00 1,331.10
Mandor o.h 0.003 158,000.00 474.00

B BAHAN
Pipa PVC AW Ø 2 " m 1.200 24,033.33 28,840.00
Perlengkapan % 0.350 24,033.33 8,411.67

C ALAT

D TOTAL (A+B+C) 56,561.77


E Overhead & Profit 0% 0.00
TOTAL 56,561.77
HARGA SATUAN PEKERJAAN (DIBULATKAN) 56,560.00
Uraian Pekerjaan : Pemasangan 1 m pipa PVC tipe AW dia. 40/ 1 1/2"
Satuan : m'
Referensi : AHSP PUPR 2016, Hal 196

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.054 101,500.00 5,481.00
Tukang o.h 0.090 133,600.00 12,024.00
Kepala tukang o.h 0.009 147,900.00 1,331.10
Mandor o.h 0.003 158,000.00 474.00

B BAHAN
Pipa PVC AW Ø 1 1/2 " m 1.200 18,900.00 22,680.00
Perlengkapan % 0.350 18,900.00 6,615.00

C ALAT

D TOTAL (A+B+C) 48,605.10


E Overhead & Profit 0% 0.00
TOTAL 48,605.10
HARGA SATUAN PEKERJAAN (DIBULATKAN) 48,600.00

Uraian Pekerjaan : Pemasangan 1m pipa PVC tipe AW dia. 32/ 1 1/4"


Satuan : m'
Referensi : AHSP PUPR 2016, Hal 196

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.054 101,500.00 5,481.00
Tukang o.h 0.090 133,600.00 12,024.00
Kepala tukang o.h 0.009 147,900.00 1,331.10
Mandor o.h 0.003 158,000.00 49.40

B BAHAN
Pipa PVC AW Ø 1 1/4 " m 1.200 16,466.67 19,760.00
Perlengkapan % 0.350 16,466.67 5,763.33
Perlengkapan

C ALAT

D TOTAL (A+B+C) 44,408.83


E Overhead & Profit 0% 0.00
TOTAL 44,408.83
HARGA SATUAN PEKERJAAN (DIBULATKAN) 44,400.00
Uraian Pekerjaan : Pemasangan pipa 1m PVC tipe AW dia. 25/ 1"
Satuan : m'
Referensi : AHSP PUPR 2016, Hal 195

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.036 101,500.00 3,654.00
Tukang o.h 0.060 133,600.00 8,016.00
Kepala tukang o.h 0.006 147,900.00 887.40
Mandor o.h 0.002 158,000.00 21.93

B BAHAN
Pipa PVC AW Ø 1 " m 1.200 10,966.67 13,160.00
Perlengkapan % 0.350 10,966.67 3,838.33

C ALAT

D TOTAL (A+B+C) 29,577.67


E Overhead & Profit 0% 0.00
TOTAL 29,577.67
HARGA SATUAN PEKERJAAN (DIBULATKAN) 29,570.00

Uraian Pekerjaan : Pemasangan pipa 1m PVC tipe AW dia. 1/2"


Satuan : m'
Referensi : AHSP PUPR 2016, Hal 195

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.036 101,500.00 3,654.00
Tukang o.h 0.060 133,600.00 8,016.00
Kepala tukang o.h 0.006 147,900.00 887.40
Mandor o.h 0.002 158,000.00 11.93

B BAHAN
Pipa PVC AW Ø 1/2 " m 1.200 5,966.67 7,160.00
Perlengkapan % 0.350 5,966.67 2,088.33

C ALAT

D TOTAL (A+B+C) 21,817.67


E Overhead & Profit 0% 0.00
TOTAL 21,817.67
HARGA SATUAN PEKERJAAN (DIBULATKAN) 21,810.00
Uraian Pekerjaan : Pemasangan 1 Bh Closet Duduk
Satuan : Bh
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 3.300 101,500.00 334,950.00
Tukang Batu o.h 1.100 133,600.00 146,960.00
Kepala Tukang o.h 0.010 147,900.00 1,479.00
Mandor o.h 0.160 158,000.00 25,280.00

B BAHAN
Closet Duduk Toto Bh 1.000 3,250,000.00 3,250,000.00
Perlengkapan % 6.000 195,000.00 1,170,000.00

C ALAT

D TOTAL (A+B+C) 4,928,669.00


E Overhead & Profit 0% 0.00
TOTAL 4,928,669.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 4,928,660.00

Uraian Pekerjaan : Pemasangan 1 Bh Wastafel


Satuan : Bh
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 1.200 101,500.00 121,800.00
Tukang Batu o.h 1.450 133,600.00 193,720.00
Kepala Tukang o.h 0.150 147,900.00 22,185.00
Mandor o.h 0.060 158,000.00 9,480.00

B BAHAN
Wastafel Bh 1.000 1,600,000.00 1,600,000.00
Semen kg 6.000 1,355.00 8,130.00
Pasir Pasang m3 0.010 234,220.00 2,342.20
Perlengkapan % 12.000 192,000.00 192,000.00

C ALAT

D TOTAL (A+B+C) 2,149,657.20


E Overhead & Profit 0% 0.00
TOTAL 2,149,657.20
HARGA SATUAN PEKERJAAN (DIBULATKAN) 2,149,650.00
Uraian Pekerjaan : Pemasangan 1 Bh Bak Cuci Piring Stainless Steel
Satuan : Bh
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.030 101,500.00 3,045.00
Tukang Batu o.h 0.300 133,600.00 40,080.00
Kepala Tukang o.h 0.030 147,900.00 4,437.00
Mandor o.h 0.015 158,000.00 2,370.00

B BAHAN
Bak Cuci Piring Stainless Steel Bh 1.000 526,440.00 526,440.00
Water Drain Bh 1.000 5,000.00 5,000.00

C ALAT

D TOTAL (A+B+C) 581,372.00


E Overhead & Profit 0% 0.00
TOTAL 581,372.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 581,370.00

Uraian Pekerjaan : Pemasangan 1 Bh Shower Spray


Satuan : Bh
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.010 101,500.00 1,015.00
Tukang Batu o.h 0.400 133,600.00 53,440.00
Kepala Tukang o.h 0.040 147,900.00 5,916.00
Mandor o.h 0.005 158,000.00 790.00

B BAHAN
Shower Spray Bh 1.000 313,000.00 313,000.00
Sealtape Bh 0.025 5,000.00 125.00

C ALAT

D TOTAL (A+B+C) 374,286.00


E Overhead & Profit 0% 0.00
TOTAL 374,286.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 374,280.00
Uraian Pekerjaan : Pemasangan 1 Bh Plastic Paper Holder
Satuan : Bh
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.010 101,500.00 1,015.00
Tukang Batu o.h 0.100 133,600.00 13,360.00
Kepala Tukang o.h 0.010 147,900.00 1,479.00
Mandor o.h 0.005 158,000.00 790.00

B BAHAN
Plastic Paper Holder Bh 1.000 456,000.00 456,000.00

C ALAT

D TOTAL (A+B+C) 472,644.00


E Overhead & Profit 0% 0.00
TOTAL 472,644.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 472,640.00

Uraian Pekerjaan : Stop Kran dia 1/2 "


Satuan : m'
Referensi : AHSP PU Badung 2018, Pemasangan Stop Kran

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.010 87,600.00 876.00
Tukang batu o.h 0.400 93,600.00 37,440.00
Kepala tukang o.h 0.040 104,000.00 4,160.00
Mandor o.h 0.005 136,875.00 684.38

B BAHAN
Stop kran 1/2" m 1.000 175,000.00 175,000.00

C ALAT

D TOTAL (A+B+C) 218,166.38


E Overhead & Profit 0% 0.00
TOTAL 218,166.38
HARGA SATUAN PEKERJAAN (DIBULATKAN) 218,160.00
Uraian Pekerjaan : Pemasangan 1 Bh Floor Drain
Satuan : Bh
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.010 101,500.00 1,015.00
Tukang Batu o.h 0.100 133,600.00 13,360.00
Kepala Tukang o.h 0.010 147,900.00 1,479.00
Mandor o.h 0.005 158,000.00 790.00

B BAHAN
Floor Drain Bh 1.000 408,800.00 408,800.00

C ALAT

D TOTAL (A+B+C) 425,444.00


E Overhead & Profit 0% 0.00
TOTAL 425,444.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 425,440.00

Uraian Pekerjaan : Pekerjaan 1 Bh Pipa Biopori 4 (1 m)


Satuan : Bh
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan ls 1.000 5,000.00 5,000.00

B BAHAN
Pipa Biopori 4" (1m) Bh 1.000 52,800.00 52,800.00

C ALAT

D TOTAL (A+B+C) 57,800.00


E Overhead & Profit 0% 0.00
TOTAL 57,800.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 57,800.00
Uraian Pekerjaan : Pekerjaan 1 Bh Dop Pipa Biopori 4"
Satuan : Bh
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan ls 1.000 1,000.00 1,000.00

B BAHAN
Pipa Biopori 3" (1m) Bh 1.000 4,500.00 4,500.00

C ALAT

D TOTAL (A+B+C) 5,500.00


E Overhead & Profit 0% 0.00
TOTAL 5,500.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 5,500.00

Uraian Pekerjaan : Pekerjaan 1 Bh Valve Taman


Satuan : Bh
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan ls 1.000 25,000.00 25,000.00

B BAHAN
Valve Taman Bh 1.000 282,208.00 282,208.00

C ALAT

D TOTAL (A+B+C) 307,208.00


E Overhead & Profit 0% 0.00
TOTAL 307,208.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 307,200.00
Uraian Pekerjaan : Pekerjaan 1 Unit STP
Satuan : Unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.010 101,500.00 101,500.00
Tukang Batu o.h 0.100 133,600.00 133,600.00
Kepala Tukang o.h 0.010 147,900.00 147,900.00
Mandor o.h 0.005 158,000.00 158,000.00

B BAHAN
STP Unit 1.000 82,800,000.00 82,800,000.00

C ALAT

D TOTAL (A+B+C) 83,341,000.00


E Overhead & Profit 0% 0.00
TOTAL 83,341,000.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 83,341,000.00

Uraian Pekerjaan : Pekerjaan 1 Unit Collecting Tank (Bio Tank)


Satuan : Unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 0.010 101,500.00 101,500.00
Tukang Batu o.h 0.100 133,600.00 133,600.00
Kepala Tukang o.h 0.010 147,900.00 147,900.00
Mandor o.h 0.005 158,000.00 158,000.00

B BAHAN
Collecting Tank Unit 1.000 5,800,000.00 5,800,000.00

C ALAT

D TOTAL (A+B+C) 6,341,000.00


E Overhead & Profit 0% 0.00
TOTAL 6,341,000.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 6,341,000.00
Uraian Pekerjaan : Pekerjaan 1 Set Pompa Irigasi
Satuan : Unit
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Pekerja o.h 1.500 101,500.00 101,500.00
Tukang Listrik o.h 1.000 133,600.00 133,600.00
Kepala Tukang o.h 0.850 147,900.00 147,900.00
Mandor o.h 0.500 158,000.00 158,000.00

B BAHAN
Irrigation Pump 2 x CR 10 - 5, 3 - 4 Bar Unit 1.000 31,000,000.00 31,000,000.00

C ALAT

D TOTAL (A+B+C) 31,541,000.00


E Overhead & Profit 0% 0.00
TOTAL 31,541,000.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 31,541,000.00

Uraian Pekerjaan : 1 Set Pek. Pas. Water Pump 65_10_3


Satuan : Set
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 200,000.00 200,000.00

B BAHAN
Water Pump 65_10_3 Unit 1.000 7,300,000.00 7,300,000.00
Material Bantu Unit 0.030 7,300,000.00 219,000.00

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.010 7,519,000.00 75,190.00

D TOTAL (A+B+C) 7,794,190.00


E Overhead & Profit 0% 0.00
TOTAL 7,794,190.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 7,794,190.00

Uraian Pekerjaan : 1 Set Pek. Pas. Water Pump 65 13 4


Satuan : Set
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 200,000.00 200,000.00

B BAHAN
Water Pump 65 13 4 Unit 1.000 8,000,000.00 8,000,000.00
Material Bantu Unit 0.030 8,000,000.00 240,000.00

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.010 8,240,000.00 82,400.00

D TOTAL (A+B+C) 8,522,400.00


E Overhead & Profit 0% 0.00
TOTAL 8,522,400.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 8,522,400.00
Uraian Pekerjaan : 1 Set Pek. Pas. Water Pump 65 7 22
Satuan : Set
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 200,000.00 200,000.00

B BAHAN
Water Pump 65 7 22 Unit 1.000 5,500,000.00 5,500,000.00
Material Bantu Unit 0.030 5,500,000.00 165,000.00

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.010 5,665,000.00 56,650.00

D TOTAL (A+B+C) 5,921,650.00


E Overhead & Profit 0% 0.00
TOTAL 5,921,650.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 5,921,650.00

Uraian Pekerjaan : 1 Set Pek. Pas. Water Pump 65 100 45


Satuan : Set
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 200,000.00 200,000.00

B BAHAN
Water Pump 65 100 45 Unit 1.000 174,800,000.00 174,800,000.00
Material Bantu Unit 0.030 174,800,000.00 5,244,000.00

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.010 174,974,800.00 1,749,748.00

D TOTAL (A+B+C) 181,993,748.00


E Overhead & Profit 0% 0.00
TOTAL 181,993,748.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 181,993,740.00

Uraian Pekerjaan : 1 Bh Pek. Ball Valve DN 25 mm


Satuan : Bh
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 40,000.00 40,000.00

B BAHAN
Ball Valve DN 25 mm Unit 1.000 110,000.00 110,000.00
Material Bantu Unit 0.010 110,000.00 1,100.00

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.000 110,110.00 0.00

D TOTAL (A+B+C) 151,100.00


E Overhead & Profit 0% 0.00
TOTAL 151,100.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 151,100.00
Uraian Pekerjaan : 1 Bh Pek. Ball Valve DN 40 mm
Satuan : Bh
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 40,000.00 40,000.00

B BAHAN
Ball Valve DN 40 mm Unit 1.000 230,000.00 230,000.00
Material Bantu Unit 0.010 230,000.00 2,300.00

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.010 230,230.00 2,302.30

D TOTAL (A+B+C) 274,602.30


E Overhead & Profit 0% 0.00
TOTAL 274,602.30
HARGA SATUAN PEKERJAAN (DIBULATKAN) 274,600.00

Uraian Pekerjaan : 1 Set Circular Swing DN 25 mm


Satuan : Set
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 1,000,000.00 1,000,000.00

B BAHAN
Circular Swing DN 25 mm Unit 1.000 2,000,000.00 2,000,000.00
Material Bantu Unit 0.001 2,000,000.00 2,000.00

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.001 2,000,000.00 2,000.00

D TOTAL (A+B+C) 3,004,000.00


E Overhead & Profit 0% 0.00
TOTAL 3,004,000.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 3,004,000.00

Uraian Pekerjaan : 1 Set Music Mixer 8 Way Output


Satuan : Set
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 200,000.00 200,000.00

B BAHAN
Musix Mixer 8 Way Output Unit 1.000 12,100,000.00 12,100,000.00
Material Bantu Unit 0.001 12,100,000.00 12,100.00

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.001 12,100,000.00 12,100.00

D TOTAL (A+B+C) 12,324,200.00


E Overhead & Profit 0% 0.00
TOTAL 12,324,200.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 12,324,200.00
Uraian Pekerjaan : 1 Set Outdoor All Weather Sound
Satuan : Set
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 200,000.00 200,000.00

B BAHAN
Outdoor All Weather Sound Unit 1.000 12,600,000.00 12,600,000.00
Material Bantu Unit 0.001 12,600,000.00 12,600.00

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.001 12,600,000.00 12,600.00

D TOTAL (A+B+C) 12,825,200.00


E Overhead & Profit 0% 0.00
TOTAL 12,825,200.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 12,825,200.00

Uraian Pekerjaan : 1 Bh Lampu LED 24 V 10 W


Satuan : Set
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 200,000.00 200,000.00

B BAHAN
Lampu LED 24 V 10 W Unit 1.000 850,000.00 850,000.00
Material Bantu Unit 0.001 850,000.00 850.00

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.001 850,000.00 850.00

D TOTAL (A+B+C) 1,051,700.00


E Overhead & Profit 0% 0.00
TOTAL 1,051,700.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 1,051,700.00

Uraian Pekerjaan : 1 Bh Mounting Bracket


Satuan : Set
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 5,000.00 5,000.00

B BAHAN
Mounting Bracket Unit 1.000 550,000.00 550,000.00
Material Bantu Unit 0.001 550,000.00 550.00

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.001 550,000.00 550.00

D TOTAL (A+B+C) 556,100.00


E Overhead & Profit 0% 0.00
TOTAL 556,100.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 556,100.00
Uraian Pekerjaan : 1 Bh Pipa PPR PN 20
Satuan : Bh
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 20,000.00 20,000.00

B BAHAN
Pipa PPR PN 20 Unit 1.000 185,000.00 185,000.00
Material Bantu Unit 0.001 185,000.00 185.00

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.001 185,000.00 185.00

D TOTAL (A+B+C) 205,370.00


E Overhead & Profit 0% 0.00
TOTAL 205,370.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 205,370.00

Uraian Pekerjaan : 1 Bh Pipa PPR PN 25


Satuan : Bh
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 20,000.00 20,000.00

B BAHAN
Pipa PPR PN 25 Unit 1.000 229,100.00 229,100.00
Material Bantu Unit 0.001 229,100.00 229.10

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.001 229,100.00 229.10

D TOTAL (A+B+C) 249,558.20


E Overhead & Profit 0% 0.00
TOTAL 249,558.20
HARGA SATUAN PEKERJAAN (DIBULATKAN) 249,550.00

Uraian Pekerjaan : 1 Bh Pipa PPR PN 40


Satuan : Bh
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 20,000.00 20,000.00

B BAHAN
Pipa PPR PN 40 Unit 1.000 531,200.00 531,200.00
Material Bantu Unit 0.001 531,200.00 531.20

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.001 531,200.00 531.20

D TOTAL (A+B+C) 552,262.40


E Overhead & Profit 0% 0.00
TOTAL 552,262.40
HARGA SATUAN PEKERJAAN (DIBULATKAN) 552,260.00
Uraian Pekerjaan : 1 Bh Pipa PPR PN 80
Satuan : Bh
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 20,000.00 20,000.00

B BAHAN
Pipa PPR PN 80 Unit 1.000 3,480,000.00 3,480,000.00
Material Bantu Unit 0.001 3,480,000.00 3,480.00

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.001 3,480,000.00 3,480.00

D TOTAL (A+B+C) 3,506,960.00


E Overhead & Profit 0% 0.00
TOTAL 3,506,960.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 3,506,960.00

Uraian Pekerjaan : 1 Set Music Program Automatic


Satuan : Set
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 600,000.00 600,000.00

B BAHAN
Music Program Automatic Unit 1.000 265,233,250.00 265,233,250.00
Material Bantu Unit 0.001 265,233,250.00 265,233.25

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.001 265,233,250.00 265,233.25

D TOTAL (A+B+C) 266,363,716.50


E Overhead & Profit 0% 0.00
TOTAL 266,363,716.50
HARGA SATUAN PEKERJAAN (DIBULATKAN) 266,363,710.00

Uraian Pekerjaan : 1 Bh Selenoid Valve DN 25


Satuan : Bh
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 200,000.00 200,000.00

B BAHAN
Selenoid Valve DN 25 Unit 1.000 1,480,000.00 1,480,000.00
Material Bantu Unit 0.001 1,480,000.00 1,480.00

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.001 1,480,000.00 1,480.00

D TOTAL (A+B+C) 1,682,960.00


E Overhead & Profit 0% 0.00
TOTAL 1,682,960.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 1,682,960.00
Uraian Pekerjaan : 1 Set Connection Pipa DN 25
Satuan : Set
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 4,000.00 4,000.00

B BAHAN
Connection Pipa DN 25 Set 1.000 75,275.00 75,275.00
Material Bantu Ls 0.001 75,275.00 75.28

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.001 75,275.00 75.28

D TOTAL (A+B+C) 79,425.55


E Overhead & Profit 0% 0.00
TOTAL 79,425.55
HARGA SATUAN PEKERJAAN (DIBULATKAN) 79,420.00

Uraian Pekerjaan : 1 Set Connection Pipa DN 40


Satuan : Set
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 4,000.00 4,000.00

B BAHAN
Connection Pipa DN 40 Set 1.000 135,150.00 135,150.00
Material Bantu Ls 0.001 135,150.00 135.15

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.001 135,150.00 135.15

D TOTAL (A+B+C) 139,420.30


E Overhead & Profit 0% 0.00
TOTAL 139,420.30
HARGA SATUAN PEKERJAAN (DIBULATKAN) 139,420.00

Uraian Pekerjaan : 1 Set Acoustic Enclosure


Satuan : Set
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 200,000.00 200,000.00

B BAHAN
Acoustic Enclosure Set 1.000 5,300,000.00 5,300,000.00
Material Bantu Ls 0.001 5,300,000.00 5,300.00

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.001 5,300,000.00 5,300.00

D TOTAL (A+B+C) 5,510,600.00


E Overhead & Profit 0% 0.00
TOTAL 5,510,600.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 5,510,600.00
Uraian Pekerjaan : 1 Set PLC 60 XP
Satuan : Set
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 200,000.00 200,000.00

B BAHAN
PLC 60 XP Set 1.000 9,250,000.00 9,250,000.00
Material Bantu Ls 0.001 9,250,000.00 9,250.00

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.001 9,250,000.00 9,250.00

D TOTAL (A+B+C) 9,468,500.00


E Overhead & Profit 0% 0.00
TOTAL 9,468,500.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 9,468,500.00

Uraian Pekerjaan : 1 Set Projectors


Satuan : Set
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 200,000.00 200,000.00

B BAHAN
Projectors Set 1.000 9,250,000.00 9,250,000.00
Material Bantu Ls 0.001 9,250,000.00 9,250.00

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.001 9,250,000.00 9,250.00

D TOTAL (A+B+C) 9,468,500.00


E Overhead & Profit 0% 0.00
TOTAL 9,468,500.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 9,468,500.00

Uraian Pekerjaan : 1 Set Waterscreen


Satuan : Set
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 400,000.00 400,000.00

B BAHAN
Waterscreen Set 1.000 146,746,000.00 146,746,000.00
Material Bantu Ls 0.001 146,746,000.00 146,746.00

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.001 146,746,000.00 146,746.00

D TOTAL (A+B+C) 147,439,492.00


E Overhead & Profit 0% 0.00
TOTAL 147,439,492.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 147,439,490.00
Uraian Pekerjaan : 1 Set Flange Connector DN 89 SS304
Satuan : Set
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 20,000.00 20,000.00

B BAHAN
Flange Connector DN 89 SS304 Set 1.000 239,200.00 239,200.00
Material Bantu Ls 0.001 239,200.00 239.20

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.001 239,200.00 239.20

D TOTAL (A+B+C) 259,678.40


E Overhead & Profit 0% 0.00
TOTAL 259,678.40
HARGA SATUAN PEKERJAAN (DIBULATKAN) 259,670.00

Uraian Pekerjaan : 1 Set Nozzle Jet Connector DN273 SS 304


Satuan : Set
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 20,000.00 20,000.00

B BAHAN
Nozzle Jet Connector DN273 SS 304 Set 1.000 5,380,000.00 5,380,000.00
Material Bantu Ls 0.001 5,380,000.00 5,380.00

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.001 5,380,000.00 5,380.00

D TOTAL (A+B+C) 5,410,760.00


E Overhead & Profit 0% 0.00
TOTAL 5,410,760.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 5,410,760.00

Uraian Pekerjaan : 1 Set Pipa Stainless Steel


Satuan : Set
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 200,000.00 200,000.00

B BAHAN
Pipa Stainless steel Set 1.000 105,800,000.00 105,800,000.00
Material Bantu Ls 0.001 105,800,000.00 105,800.00

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.001 105,800,000.00 105,800.00

D TOTAL (A+B+C) 106,211,600.00


E Overhead & Profit 0% 0.00
TOTAL 106,211,600.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 106,211,600.00
Uraian Pekerjaan : 1 Set Pasangan Kabel
Satuan : Set
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 200,000.00 200,000.00

B BAHAN
Kabel Set 0.600 53,800,000.00 32,280,000.00
Material Bantu Ls 0.001 53,800,000.00 53,800.00

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.001 53,800,000.00 53,800.00

D TOTAL (A+B+C) 32,587,600.00


E Overhead & Profit 0% 0.00
TOTAL 32,587,600.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 32,587,600.00

Uraian Pekerjaan : 1 Set Under Swing Motor


Satuan : Set
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 200,000.00 200,000.00

B BAHAN
Under Swing Motor Set 1.000 12,500,000.00 12,500,000.00
Material Bantu Ls 0.001 12,500,000.00 12,500.00

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.001 12,500,000.00 12,500.00

D TOTAL (A+B+C) 12,725,000.00


E Overhead & Profit 0% 0.00
TOTAL 12,725,000.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 12,725,000.00

Uraian Pekerjaan : 1 Set Pompa Atman HA 35


Satuan : Set
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 200,000.00 200,000.00

B BAHAN
Pompa Atman HA 35 Set 1.000 2,500,000.00 2,500,000.00
Material Bantu Ls 0.001 2,500,000.00 2,500.00

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.001 2,500,000.00 2,500.00

D TOTAL (A+B+C) 2,705,000.00


E Overhead & Profit 0% 0.00
TOTAL 2,705,000.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 2,705,000.00
Uraian Pekerjaan : 1 Set Computer
Satuan : Set
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Biaya Pemasangan lot 1.000 200,000.00 200,000.00

B BAHAN
Computer Set 1.000 21,400,000.00 21,400,000.00
Material Bantu Ls 0.001 21,400,000.00 21,400.00

C ALAT
Peralatan, gantungan, mur, baut, dll Ls 0.001 21,400,000.00 21,400.00

D TOTAL (A+B+C) 21,642,800.00


E Overhead & Profit 0% 0.00
TOTAL 21,642,800.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 21,642,800.00

Uraian Pekerjaan : Pembuatan 1 Unit Sumur Bor


Satuan : Set
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Jasa Pembuatan Sumur Bor lot 1.000 30,000,000.00 30,000,000.00

B BAHAN

C ALAT

D TOTAL (A+B+C) 30,000,000.00


E Overhead & Profit 0% 0.00
TOTAL 30,000,000.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 30,000,000.00

Uraian Pekerjaan : Pekerjaan 1 Set Submersible Deep Well Pump


Satuan : Set
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Jasa Pemasangan lot 1.000 400,000.00 400,000.00

B BAHAN
Submersible Deep Well Pump Set 1.000 27,000,000.00 27,000,000.00

C ALAT

D TOTAL (A+B+C) 27,400,000.00


E Overhead & Profit 0% 0.00
TOTAL 27,400,000.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 27,400,000.00
Uraian Pekerjaan : Pekerjaan 1 Unit Tower Tank 1,5 m3
Satuan : Set
Referensi :

NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

A UPAH
Jasa Pemasangan lot 1.000 100,000.00 100,000.00

B BAHAN
Tower Tank 1,5 m3 Set 1.000 7,500,000.00 7,500,000.00

C ALAT

D TOTAL (A+B+C) 7,600,000.00


E Overhead & Profit 0% 0.00
TOTAL 7,600,000.00
HARGA SATUAN PEKERJAAN (DIBULATKAN) 7,600,000.00
ANALISSA HARGA POHON

NO JENIS POHON SAT HARGA SATUAN (RP.)


P
1 Tanah Subur + Pupuk M3 Rp22,000.00
2 Rumput Gajah Mini M2 Rp55,000.00
3 Pohon Kenanga t= 1 m BH Rp2,800,000.00
4 Pohon Jepun Bali t= 2 m BH Rp1,800,000.00
5 Pohon Kelapa t= 2 m BH Rp2,500,000.00
6 Pohon Intaran t= 2 m BH Rp2,200,000.00
7 Pohon Cempaka t= 2 m BH Rp1,600,000.00
8 Pohon Juwet t= 2 m BH Rp1,700,000.00
9 Pohon Majegau t= 2 m BH Rp2,500,000.00
10 Pohon Boni t= 2 m BH Rp1,900,000.00
11 Pohon Manggis t= 2 m BH Rp2,200,000.00
12 Pohon Kepundung t= 2 m BH Rp1,350,000.00
13 Pohon Dadap t= 2 m BH Rp1,400,000.00
14 Pohon Sentul/Kecapi t= 2 m BH Rp1,750,000.00

Anda mungkin juga menyukai