B. - TENAGA
Pekerja Org/Hri
Mandor Org/Hri
Tukang Org/Hri
Kepala tukang Org/Hri
C. - PERALATAN
D. JUMLAH ( A + B + C )
E. OVERHEAD & PROFIT ( 10% X D )
F. HARGA SATUAN PEKERJAAN ( D + E )
-
C. Sub. Jumlah -
278,235.12
27,823.51
306,058.64