Dokumen - Tips Rum
Dokumen - Tips Rum
NO. NILAI KONTRAK DASAR KENA PAJAK PPN PPH MASUK KE REKENING FEE 30%
TOTAL 6,938,941.09
NO NAMA PEKERJAAN NILAI KNTRAK MASUK REK PNJM BENDERA 7,5% KWJPAN 30%
1 perencanaan tinalan 11,484,600.00 10,022,923.64 751,719.27 3,006,877.09
TOTAL
ITUNGAN ASHADI
KONTROL
11,484,600.00
4,018,300.00
11,000,000.00
BERSIH
6,264,327.27
2,191,800.00
6,000,000.00
14,456,127.27
PROYEK PERENCANAAN DINAS PEKERJAAN UMUM KOTA KEDIRI TAHUN ANGGARAN 2018
GRAHA MAKMUR CONSULTANT
NO. NILAI KONTRAK DASAR KENA PAJAK PPN PPH (ps4) Nilai yg masuk rekening Vi Kwajiban 30% NAMA PEKERJAAN
TOTAL 150,271,000.00
NO NILAI KONTRAK KWAJIBAN 30% TERBAYAR PENERIMA TANDA TANGAN YG BERTANGGUNG NAMA PAKET
JAWAB
NO. NILAI KONTRAK DASAR KENA PAJAK PPN PPH
126,816,000.00 145,310,000.00
34,320,000.00 39,325,000.00
21,648,000.00 24,805,000.00
12,174,545.45 13,950,000.00
6,960,000.00 7,975,000.00
39,552,000.00 45,320,000.00
PAKET KTT
PENGAWASAN TEKNIS :
- PEMBANGUNAN JALAN GANG BHAKTI DI JALAN PRAMUKA
KELURAHAN TANJUNG PALAS TENGAH
- PEMBUATAN GORONG-GORONG DI TANJUNG PALAS HILIR
TOTAL 57,722,636.36
ADMINISTRASI 10%
FEE 30 % ( (sewa alat.bayar
Rp. ) BENDERA 10% pencairan jaminan MANSUR ppk KONTROL
produk),dll
TENAGA GAMBAR
NO. MASUK REKENING FEE BENDERA FEE DINAS KEPERLUAN Pinjam Tenaga Ahli 2 ska TOTAL
pembuatan produk 2
ADMINISTRASI
Orang
Kesepakatan Bagi 2
(474,720.00) : 2
- 237,360.00
NO. NILAI KONTRAK DASAR KENA PAJAK PPN PPH MASUK KE REKENING FEE 5% KONTROL
TOTAL 25,059,709.09
NAMA PEKERJAAN KET.
PPN PPH
NO. NILAI KONTRAK DASAR KENA PAJAK
10% 4%
1 60,000,000 54,545,455 5,454,545 2,181,818
2 42,000,000 38,181,818 3,818,182 1,527,273
3 60,000,000 54,545,455 5,454,545 2,181,818
4 1,338,000,000 1,216,363,636 121,636,364 48,654,545
PEMBAGIAN ANGGARAN
NILAI FISIK
SISA
1,338,000,000
MASUK KE REKENING
52,363,636
36,654,545
52,363,636
1,167,709,091
Nama NILAI KONTRAK DASAR KENA PAJAK PPN PPH MASUK KE REKENING
RESKINDO 15% POTONG BENDERA
Kontrak/Dinas ( Rp.) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
Belum Terbayar
Rekap Kerjasama Tim Toyoresmi Dengan Mas Qoiron
MASUK KE
Nama NILAI KONTRAK DASAR KENA PAJAK PPN PPH REKENING Bendera setelah dipotong bendera presentase Keterangan
Kontrak/Dinas ( Rp.) ( Rp. ) ( Rp. ) ( Rp. )
( Rp. )
kartoharjo
9,906,600.00 9,006,000.00 900,600.00 360,240.00 8,645,760.00 648,432.00 7,997,328.00 7,5% tofiq
taman ploso 9,908,800.00 9,008,000.00 900,800.00 360,320.00 8,647,680.00 648,576.00 7,999,104.00 7,5% taufiq
9,008,000.00
sekolahan 8,000,000.00 7,272,727.27 727,272.73 290,909.09 6,981,818.18 523,636.36 6,458,181.82 7,5% taufiq
7,272,727.27
pohon tepi jalan 7,850,400.00 7,136,727.27 713,672.73 285,469.09 6,851,258.18 513,844.36 6,337,413.82 7,5% taufiq
7,136,727.27
baron 9,857,400.00 8,961,272.73 896,127.27 358,450.91 8,602,821.82 645,211.64 7,957,610.18 7,5% taufiq
8,961,272.73
vertikal 4,096,562.71 3,724,147.92 372,414.79 148,965.92 3,575,182.00 268,138.65 3,307,043.35 7,5% taufiq
3,724,147.92
40,056,681.17
MASUK KE
Nama NILAI KONTRAK DASAR KENA PAJAK PPN PPH
REKENING Bendera setelah dipotong bendera presentase Keterangan
Kontrak/Dinas ( Rp.) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
77,669,090.91
125,873,699.35 125,873,699.35
MASUK KE
Nama NILAI KONTRAK DASAR KENA PAJAK PPN PPH REKENING Bendera setelah dipotong bendera presentase Keterangan
Kontrak/Dinas ( Rp.) ( Rp. ) ( Rp. ) ( Rp. )
( Rp. )
kusta ipung 8,120,200.00 7,382,000.00 738,200.00 295,280.00 7,086,720.00 354,336.00 6,732,384.00 5% ipung
7,382,000.00
singo 8,724,102.29 7,931,002.08 793,100.21 317,240.08 7,613,762.00 571,032.15 7,042,729.85 7,5% kita
7,931,002.08
13,775,113.85
Rekap Kerjasama Tim Toyoresmi Dengan Mas Qoiron
Nama NILAI KONTRAK DASAR KENA PAJAK PPN PPH MASUK KE REKENING
Kontrak/Dinas ( Rp.) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
46,406,400.00
Nama NILAI KONTRAK DASAR KENA PAJAK PPN PPH MASUK KE REKENING
Kontrak/Dinas ( Rp.) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
59,259,403.64
setelah dipotong
pengawasan Rp 25,403,480 Rp 12,701,740
perencanaan Rp 17,240,642
pendapatan bersih mbah hari Rp 29,942,382
Perencanaan Rehabilitasi
Saluran Drainase RW I
Kel.Lirboyo 16,000,000.00 13,963,636.36 698,181.82 13,265,454.55 5% ASEP
Pengawasan Pembangunan
Saluran Irigasi Kel. 8,724,100 7,613,760.00 571,032.00 7,042,728.00 7,5% GARDATAMA
Singonegaran
Pengawasan Pembangunan
Saluran Irigasi Kel. Ngronggo 10,095,000.00 8,810,181.82 660,763.64 8,149,418.18 7,5% GARDATAMA
Pengawasan Rehabilitasi
Sedang/Berat Bangunan 8,000,000.00 6,981,818.18 523,636.36 6,458,181.82 7,5% taufiq
Sekolah
Pengawasan Rehabilitasi
Saluran Drainase RW I 10,250,000.00 8,945,454.55 447,272.73 8,498,181.82 5% asep
Kel.Lirboyo
JUMLAH Rp 500,000
SALDO -Rp 6,581,000
JUMLAH Rp -
SALDO -Rp 5,815,000
SAIFUL
Tanggal PEMASUKAN KETERANGAN NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
JUMLAH Rp -
SALDO -Rp 145,000
Tanggal PENGELUARAN KETERANGAN
Materai 6000 @20 lbr ( 5 KONTRAK) 120000
Materai 6000 @2 lbr (Pembenahan KONTRAK) Rp 12,000
Materai 6000 @5 lbr (KWITANSI) Rp 30,000
Jaminan Pemiliharaan 5 paket @Rp.70.000 Rp 350,000
Ketua PPHP , 5 paket Rp 300,000
Team PPHP @Rp. 50.000, 2 org , 5 paket Rp 500,000
Kwitansi @Rp. 50.000, 2 org, 5 paket Rp 500,000
Keuangan (H) Rp 200,000
Laporan 4 rangakp, 5 paket @Rp. 100.000 Rp 2,000,000 PREDIKSI
Foto Kopi Pencairan Rp 63,000
Foto Kopi Pencairan Rp 6,000
Flasdisk 5 paket @Rp. 100.000 Rp 500,000
penawaran 5 paket @500.000 Rp 2,500,000
JUMLAH Rp 7,081,000
JUMLAH Rp 5,815,000
Tanggal PENGELUARAN KETERANGAN
Jaminan pengawasan 70000
Jaminan perencanaan Rp 75,000
JUMLAH Rp 145,000
Rp 13,041,000