REKAPITULASI

DAFTAR QUANTITAS DAN HARGA

PEKERJAAN : PEMBANGUNAN AIR BERSIH


LOKASI : RANGAS
TAHUN ANGGARAN : 2021

NO URAIAN PEKERJAAN JUMLAH HARGA (RP)

I PEKERJAAN PERSIAPAN 1,823,985.00


II PEKERJAAN TANAH 1,460,815.80
III PEKERJAAN PONDASI 3,914,508.46
IV PEKERJAAN BETON 13,949,453.80
V PEKERJAAN DINDING 11,543,208.89
VI PEKERJAAN LANTAI 17,828,734.26
VII PEKERJAAN SANITASI 19,128,073.93
VIII PEKERJAAN INSTALASI LISTRIK 2,606,620.05
IX PEKERJAAN PINTU & VENTILASI 1,858,426.71
X PEKERJAAN GRILL PENUTUP SALURAN 599,426.30
XI PEKERJAAN ATAP 6,714,754.90

A JUMLAH REAL COST 81,428,008.08


B PPN (15% x A) 12,214,201.21
D JUMLAH TOTAL (A + B + C ) 93,642,209.30
E DIBULATKAN (D) 93,600,000.00
TERBILANG :
SEMBILAN PULUH TIGA JUTA ENAM RATUS RIBU RUPIAH

Mamuju , 20 April 2021


Dibuat Oleh ;

Muh Dani J
Estimator