ACTION PLAN
TPC INDOPLASTIC AND CHEMICAL
- Cross Reference between ISO 9001:2000 vs TPC’s
procedure
1. Review Selling and Order Handling For Domestic
sales Procedure.
2. Review Selling and Order Handling For Export sales
Procedure.
7.2.1, 7.2.2, 7.2.3 27-11-07
3. Review handling of customer Complaint procedure
4. Review Finish Product delivery procedure
Dom/Export)
5. Review Handling of Export Document
1. Develop Handling of develop and modification
database/application program procedure
2. Develop Back up and Restore data procedure
3. Develop Preventive and Corrective 4.2.3, 4.2.4, 6.3, 7.5.1 27-11-07
Maintenance for computer and Peripherals
4. Review Computer list and diagram of computer
network
5. Develop Information security procedure.
1. Review Work Order Procedure
2. Develop Preventive maintenance Procedure
Develop Control of Measurement Devices (Calibration)
Review List of all measurement devices (acceptance 6.3, 7.5.1, 7.6 27-11-07
criteria for calibration/verification result)
Review Handling of Stock Spare part procedure
Page 2 of 5
ACTION PLAN
TPC INDOPLASTIC AND CHEMICAL
1. Develop Production planning procedure
2. Review Off Grade / Off Spec Product Handling
3. Review Packing of PVC Resin
4. Review PVC Resin Production
5. Review Raw Material Test and Changing
6. Develop traceability simulation instruction.
7.5.1, 7.5.2, 7.5.3, 7.5.4,
7.5.5, 7.6, 8.2.3, 8.2.4, 8.3, 27-11-07
1. Review Quality Plan Incoming Raw Material
8.4
2. Review Quality Plan Inprocess Raw Material
3. Review Quality Plan PVC Resin Product
4. Review Quality Plan Utility / Water & waste water
5. Develop / review Inspection and testing Plan.
Page 3 of 5
ACTION PLAN
TPC INDOPLASTIC AND CHEMICAL
Review/Develop Control Of Documents Procedure:
If document will control as soft copy, organization
should be define the control of documents, accessing
and printing able of documents
Make Stamp for ‘controlled copy-do not copy’,
‘obsolete’, ‘uncontrolled copy’, ‘master document’
4.2.3 30-11-07
Review Document register as Master list Document
Each Department should be identify all external
document and register to Document controller
(External Document such as: Legal regulations,
Manual Book, ASTM, etc) and make External
Document register.
Define Method of Numbering documents (Procedure,
IK, FR, Standart, etc), Level of Approval Documents,
Format for all documents (incl: font type, structure, 4.2.3 22-11-07
etc).
Develop Control Of Record Procedure:
Make Masterlist of Records for each section. 4.2.4 27-11-07
Page 4 of 5
ACTION PLAN
TPC INDOPLASTIC AND CHEMICAL
Note:
1. Procedure is document level 2 at documentation structure, after quality manual (level 1). This action plan of course can grow or made one depended
from the process in organization at the time of consultancy.
2. Procedure later will be equiped with Work Instruction/form/checklist ( level 3) which more detail of each activity done ( if needs). So at action this plan
doesn't identify document level 3 (except new thing), but is adapted for requirement required, and can grow as according to consultancy.
3. Ascertains with PIC ( PIC: Person In Charge, finalizes of tasks intended), and due date making of the tasks, ( have been agreed on at least 2 days
before have been sent to Premysis Office in Surabaya, in the form of Hard Copy)