PEKERJAAN PENDAHULUAN
PERSIAPAN 150 KOLAM M2 45,000.00 3,500
PEKERJAAN PIPA
PIPA 3" BH 110.00 131,000
ELBOW 3' BH 450.00 47,000
JUMLAH HARGA
157,500,000
10,800,000,000
3,600,000
14,410,000.00
21,150,000.00
NO. KETERANGAN SAT VOLUME HARGA
SATUAN
PEKERJAAN PENDAHULUAN
PERSIAPAN 150 KOLAM M2 40,000.00 3,500
PEKERJAAN PIPA
PIPA 3" BH 150.00 131,000
ELBOW 3' BH 600.00 47,000
JUMLAH HARGA
140,000,000
8,640,000,000
3,600,000
19,650,000.00
28,200,000.00