Anda di halaman 1dari 5

RENCANA ANGGARAN BIAYA

Pekerjaan : Pemagaran Lahan


Lokasi : Serang
Tahun : 2021

NO URAIAN PEKERJAAN SATUAN HARGA JUMLAH


VOLUME BOBOT
SATUAN HARGA

I PEKERJAAN PERSIAPAN
1 Biaya Mobilisasi dan Demobilisasi ls 1.000 10,000,000.00 10,000,000.00 6.92
2 Pembersihan Lahan, Pengukuran dan Bouwplank ls 1.000 5,000,000.00 5,000,000.00 3.46
3 Gudang Kerja m2 7.500 1,039,230.50 7,794,228.75 5.39
4 Biaya Listrik Kerja dan air kerja ls 1.000 2,000,000.00 2,000,000.00 1.38
SUM TOTAL 24,794,228.750

II PEKERJAAN TANAH dan PASANGAN PONDASI


1 Pek. Galian Tanah Pondasi dan Sloof m3 45.080 77,962.50 3,514,549.50 2.43
2 Pek. Urugan Tanah Kembali Bekas Galian m3 13.524 21,829.50 295,222.16 0.20
3 Pas. Batu belah ad 1 : 4 m3 24.150 751,553.00 18,150,004.95 12.55
SUM TOTAL 21,959,776.608

III PEKERJAAN BETON


1 Cor Pondasi kolom Site Mix K.175 m3 5.299 1,200,000.00 6,359,040.00 4.40
2 Pekerjaan Sloof beton bertulang 20/25 m3 4.600 3,750,000.000 17,250,000.00 11.93
3 Pekerjaan Ring Balok bertulang 15/20 m3 3.680 3,750,000.000 13,800,000.00 9.55
SUM TOTAL 37,409,040.000

IV PEKERJAAN PAGAR PRA CETAK


1 Pek. Pasangan Pagar Beton Precast K225, t=200 cm m1 92.000 582,285.00 53,570,220.00 37.05
2 Pek. Pasang Kawat Duri 5 Jalur Dengan Besi Siku m1 92.000 52,624.37 4,841,441.97 3.35
SUM TOTAL 58,411,661.974

V PEKERJAAN LAIN - LAIN


Pek. Perapihan dan Pembersihan Lokasi dari sisa matrial ls 1.000 2,000,000.00 2,000,000.00 1.38
SUM TOTAL 2,000,000.000

JUMLAH 144,574,707.33 100.00


PEMBULATAN 144,574,000.00 100.00
JADWAL PELAKSANAAN TERHADAP MC0
PEMAGARAN LAHAN BARU
UPT. RUMAH SAKIT UMUM DAERAH BANTEN

KONTRAK MC 0% WAKTU PELAKSANAAN 45 HARI KALENDER


NO URAIAN PEKERJAAN HARGA JUMLAH BOBOT JUMLAH BOBOT 1 8 15 22 29 36 43 KET
VOLUME VOLUME
SATUAN HARGA (%) HARGA (%) 7 14 21 28 35 42 45
I PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 1.000 ls #NAME? #REF! #REF! #NAME? ls #NAME? #NAME? #NAME? 100%
2 Biaya Mobilisasi dan Demobilisasi 1.000 ls 10,000,000.00 #REF! #REF! #NAME? ls #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
3 Pembersihan Lahan, Pengukuran dan Bouwplank 1.000 ls 5,000,000.00 #REF! #REF! #NAME? ls #NAME? #NAME? #NAME?
4 Gudang Kerja 7.500 m2 1,039,230.50 #REF! #REF! #NAME? m2 #NAME? #NAME? #NAME? #NAME?
5 Biaya Listrik Kerja dan air kerja 1.000 ls 2,000,000.00 #REF! #REF! #NAME? ls #NAME? #NAME? #NAME?
6 Administrasi , Dokumentasi dan Asbuild Drawing 1.000 ls #NAME? #REF! #REF! #NAME? ls #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
II PEKERJAAN TANAH dan PASANGAN PONDASI
1 Pek. Galian Tanah Pondasi dan Sloof 129.510 m3 77,962.50 #REF! #REF! #NAME? m3 #NAME? #NAME? #NAME? #NAME?
2 Pek. Urugan Tanah Kembali Bekas Galian 7.310 m3 21,829.50 #REF! #REF! #NAME? m3 #NAME? #NAME? #NAME? #NAME?
3 Lap. Pasir Urug Bawah Pondasi ,t = 5 cm 20.880 m3 #NAME? #REF! #REF! #NAME? m3 #NAME? #NAME? #NAME? #NAME?
4 Pas. Batu belah ad 1 : 4 116.030 m3 751,553.00 #REF! #REF! #NAME? m3 #NAME? #NAME? #NAME? #NAME? #NAME?
III PEKERJAAN BETON
1 Cor Pondasi kolom Site Mix K.175 88.300 m3 1,200,000.00 #REF! #REF! #NAME? m3 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
2 Pekerjaan Sloof beton bertulang 20/25
- Pembesian 5,401.700 kg #NAME? #REF! #REF! #NAME? kg #NAME? #NAME? #NAME? #NAME? #NAME? 50%
- Cor Beton Site Mix K.175 41.320 m3 #NAME? #REF! #REF! #NAME? m3 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
- Begesting Sloof (2x pakai 75%) 429.200 m2 #NAME? #REF! #REF! #NAME? m2 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
3 Pekerjaan Ring Balok bertulang 15/20
- Pembesian 4,094.840 kg #NAME? #REF! #REF! #NAME? kg #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
- Cor Beton Site Mix K.175 25.750 m3 #NAME? #REF! #REF! #NAME? m3 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
- Begesting Sloof (2x pakai 75%) 423.100 m2 #NAME? #REF! #REF! #NAME? m2 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
IV PEKERJAAN PAGAR PRA CETAK
1 Pek. Pasangan Pagar Beton Precast K225, t=200 cm 858.400 m1 582,285.00 #REF! #REF! #NAME? m1 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
2 Pek. Pasang Kawat Duri 5 Jalur Dengan Besi Siku 858.400 m1 52,624.37 #REF! #REF! #NAME? m1 #NAME? #NAME? #NAME? #NAME? #NAME?
V PEKERJAAN LAIN - LAIN
1 Pek. Perapihan dan Pembersihan Lokasi dari sisa matrial 1.000 ls 2,000,000.00 #REF! #REF! 1.000 ls 2,000,000.00 #NAME? #NAME?
VI BIAYA K3 (Alat Pelindung diri)
Topi pelindung/Helm Proyek 20.000 bh #NAME? #REF! #REF! #NAME? bh #NAME? #NAME? #NAME?
Sepatu Keselamatan (safety Shoes) 20.000 psg #NAME? #REF! #REF! #NAME? psg #NAME? #NAME? #NAME?
Rompi Keselamatan 20.000 bh #NAME? #REF! #REF! #NAME? bh #NAME? #NAME? #NAME?
Masker Kesehatan 3 playy 50.000 box #NAME? #REF! #REF! #NAME? box #NAME? #NAME? #NAME?
Bendera K3 1.000 bh #NAME? #REF! #REF! #NAME? bh #NAME? #NAME? #NAME? 0%
JUMLAH #REF! #REF! #NAME? #NAME?
PPN 10% #REF! PROGRES MINGGUAN #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
JUMLAH + PPN #REF! PROGRES MINGGUAN KUMULATIF - #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
PEMBULATAN #REF! PROGRES REALISASI MINGGUAN
PROGRES REALISASI MINGGUAN KUMULATIF -
DEVIASI -
#NAME?
### #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME?

### #NAME? #NAME? #NAME? #NAME?


### #NAME? #NAME? #NAME? #NAME?
Oktober

Senin Selasa Rabu Kamis Jumat Sabtu Minggu

28 29 30 01 02 03 04 Minggu ke - 1 (satu), Periode :


05 06 07 08 09 10 11 Minggu ke - 2 (dua), Periode :
12 13 14 15 16 17 18 Minggu ke - 3 (tiga), Periode :
19 20 21 22 23 24 25 Minggu ke - 4 (empat), Periode :
26 27 28 29 30 31 01 Minggu ke - 5 (lima), Periode :
Minggu ke - 6 (enam), Periode :
Minggu ke - 7 (tujuh), Periode :
November
Senin Selasa Rabu Kamis Jumat Sabtu Minggu

26 27 28 29 30 31 01
02 03 04 05 06 07 08
09 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 01 02 03 04 05 06

Desember
Senin Selasa Rabu Kamis Jumat Sabtu Minggu

30 01 02 03 04 05 06
07 08 09 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31 01 02 03
04 05 06 07 08 09 10
Tgl Awal
Tgl Awal Minggu Tgl Akhir Minggu Tgl Akhir Minggu Tgl TTD
Minggu

27 Oktober 2020 02 November 2020 27 Juli 2 Juli 2020 3 Juli 2020


03 November 2020 09 November 2020 3 Juli 9 Juli 2020 10 Juli 2020
10 November 2020 16 November 2020 10 Juli 16 Juli 2020 17 Juli 2020
17 November 2020 23 November 2020 17 Juli 23 Juli 2020 24 Juli 2020
24 November 2020 30 November 2020 24 Juli 30 Juli 2020 31 Juli 2020
01 Desember 2020 07 Desember 2020 1 Juli 7 Juli 2020 8 Juli 2020
08 Desember 2020 10 Desember 2020 8 Juli 10 Juli 2020 11 Juli 2020
Periode

27 Juli s/d 2 Juli 2020 1 Januari


3 Juli s/d 9 Juli 2020 2 Februari
10 Juli s/d 16 Juli 2020 3 Maret
17 Juli s/d 23 Juli 2020 4 April
24 Juli s/d 30 Juli 2020 5 Mei
1 Juli s/d 7 Juli 2020 6 Juni
8 Juli s/d 10 Juli 2020 7 Juli