LAMPIRAN 1 : KEPUTUSAN WALIKOTA PONTIANAK

NOMOR : …………………... TAHUN 2010

TENTANG
STANDARISASI HARGA SATUAN BAHAN, UPAH DAN ANALISA
BIAYA PEKERJAAN YANG TERDIRI DARI ANALISA E DAN ANALISA
BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN (ABK-SNI) KOTA PONTIANAK
TAHUN ANGGARAN 2010

( Periode Januari s/d Desember 2010 )

HARGA

TANPA HARGA TERMASUK


NO TENAGA KERJA SATUAN KODE KEUNTUNGAN KEUNTUNGAN KEUNTUNGAN
(OVERHEAD) (OVERHEAD) (OVERHEAD)
(Rp) (Rp) (Rp)

A. UPAH
1 Mandor Lapangan Org/hari L.061 60,500.00 6,050.00 66,550.00
2 Mekanik Org/hari L.071 60,500.00 6,050.00 66,550.00
3 Kepala Tukang Org/hari L.073 60,500.00 6,050.00 66,550.00
4 Tukang Batu / Kayu / Gali / Besi / Cor / Semen / Cat / Listrik / Pancang Org/hari L.079 55,000.00 5,500.00 60,500.00
5 Operator terlatih Org/hari L.081 49,500.00 4,950.00 54,450.00
6 Operator semi terlatih Org/hari L.082 44,000.00 4,400.00 48,400.00
7 Sopir Org/hari L.091 49,500.00 4,950.00 54,450.00
8 Pekerja / Buruh Lapangan Tak terlatih Org/hari L.101 44,000.00 4,400.00 48,400.00
9 Pekerja / Buruh Lapangan terlatih Org/hari L.106 49,500.00 4,950.00 54,450.00

HARGA TERMASUK
NO MATERIAL SATUAN KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

B. BAHAN PENGISI
1 Batu Kong M³ M.101 192,500.00
2 Batu Sap Pinang M³ - 215,050.00
3 Batu pecah 15-20 cm M³ - 230,230.00
4 Batu pecah 10-15 cm M³ M.020 246,070.00
5 Batu pecah 5-7 cm M³ M.022 271,060.00
6 Batu pecah 3-5 cm M³ M.023 290,700.00
7 Batu pecah 2-3 cm M³ M.024 327,030.00
8 Batu pecah 1-2 cm M³ M.025 373,580.00
9 Batu pecah 1-1 cm M³ - 394,900.00
10 Batu pecah 0,5 cm M³ M.026 394,900.00
11 Stone Dust M³ - 371,360.00
12 Aspal Kg - 9,900.00
13 Pasir M³ M.040 58,370.00
14 Semen PC Zak M.080 70,400.00
15 Semen PC Kg - 1,400.00
16 Tanah Ex. Peniraman M³ M.050.a 115,060.00
17 Tanah EX. Peladis M³ M.050 220,000.00
18 Paving Block Bh - 2,200.00
19 Paving Stone Bh - 3,630.00
20 Batu Bata 5 x 11 x 22cm Bh - 2,530.00
21 Bataco 15 x 30 x 7 cm Bh - 990.00
22 Bataco 20 x 40 x 9 cm ( press ) Bh - 2,530.00
23 Bataco 20 x 40 x 7 cm ( press ) Bh - 2,310.00
24 Kerawang ( roster ) 18 x 18 cm Bh - 3,300.00
25 Kerawang press ( roster ) 30 x 30 cm Bh - 26,400.00
26 Keramik 20 x 20 cm Kotak - 50,120.00
27 Keramik 30 x 30 cm Kotak - 40,030.00
28 Keramik 30 x 30 cm Unpolished Kotak - 54,450.00
29 Keramik 30 x 30 cm Artistik Kotak - 64,130.00
30 Keramik 40 x 40 cm (biasa) Kotak - 71,390.00
31 Keramik 40 x 40 cm (anti gores) Kotak - 96,250.00
32 Keramik 40 x 40 cm Unpolished Kotak - 98,450.00
33 Keramik 60 x 60 cm (anti gores) Kotak - 277,200.00
34 Granito 40 x 40 cm Kotak - 189,420.00
35 Marmer M² - 453,750.00
36 Wood Flooring M² - 275,000.00
37 List Keramik WC. 8 x 20 cm Bh - 242,000.00
38 Plint Kayu uk. 2 x 10 cm M1 - 46,750.00
39 Keramik dinding 20 x 20 cm Kotak - 50,380.00
40 Keramik dinding 20 x 25 cm Kotak - 54,890.00
41 Floor Hardener Kg - 8,250.00
42 Beton Ready Mix B 0 M³ - 792,000.00
43 Beton Ready Mix 125 M³ - 830,500.00
HARGA TERMASUK
NO MATERIAL SATUAN KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

44 Beton Ready Mix 175 M³ - 880,000.00


45 Beton Ready Mix 225 M³ - 1,017,500.00
46 Beton Ready Mix 300 M³ - 1,094,500.00
47 Additive Ready Mix M³ - 44,000.00
48 Karung Goni Curing Beton ( 0.7m² ) Gulung - 11,550.00
49 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 20 x 20, K 300 - 6m Btg - 1,155,000.00
50 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K 300 - 6m Btg - 1,485,000.00
51 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 28 x 28 x 28, K 300 - 6m Btg - 990,000.00
52 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 32 x 32 x 32, K 300 - 6m Btg - 1,105,500.00
53 Papan Turap Uk. 15/50 - 5m Kpg - 880,000.00
54 Papan Turap Uk. 15/50 - 6m Kpg - 1,122,000.00
55 Pemancangan Mini Pile - 6m Btg - 138,050.00
56 Sewa Pompa Ready Mix (Min. 100 M³) M³ - 55,000.00
57 Bahan Plastik Cor Beton M² - 3,850.00
HARGA TERMASUK
NO MATERIAL SATUAN KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

C. BAHAN KAYU
1 Ky. Belian tdk ketam Uk. 6/6 - 4 M M³ - 9,736,320.00
2 Ky. Belian tdk ketam Uk. 7/7 - 4 M M³ - 11,463,540.00
3 Ky. Belian tdk ketam Uk. 8/8 - 4 M M³ - 9,063,230.00
4 Ky. Belian tdk ketam Uk. 9/9 - 4 M M³ M.181.a 9,350,550.00
5 Ky. Belian tdk ketam Uk. 10/10 - 4 M M³ M.181.b 7,903,940.00
6 Ky. Belian tdk ketam Uk. 12/12 - 4 M M³ - 8,116,350.00
7 Ky. Belian tdk ketam Uk. 18/18 - 4 M M³ - 7,370,770.00
8 Ky. Belian ketam Uk. 6/6 - 4 M M³ - 8,934,750.00
9 Ky. Belian ketam Uk. 7/7 - 4 M M³ - 11,892,210.00
10 Ky. Belian ketam Uk. 8/8 - 4 M M³ - 10,771,200.00
11 Ky. Belian ketam Uk. 5/10 - 4 M M³ - 10,771,200.00
12 Ky. Belian ketam Uk. 4/8 - 4 M M³ - 9,453,120.00
13 Papan belian ketam (4m) M³ M.181.e 16,958,370.00
14 Papan belian tdk ketam (4m) M³ M.181.d 15,074,070.00
15 Ky. klas I Bengkirai uk. 8/8 - 4 M ( ketam ) M³ M.181.f 6,660,170.00
16 Ky. klas I Bengkirai uk. 8/8 - 4 M ( tdk ketam ) M³ M.181.g 11,297,220.00
17 Ky. klas I Bengkirai uk. 7/7 - 4 M ( tdk ketam ) M³ - 4,630,120.00
18 Ky. klas I Bengkirai uk. 7/7 - 4 M ( ketam ) M³ - 6,033,170.00
19 Ky. klas I Bengkirai uk. 5/10 - 4 M ( ketam / untuk kusen ) M³ - 11,550,000.00
20 Kusen Ky Kelas I Bangkirai uk. 5/10 M³ - 82,500.00
21 Ky. klas II Mabang uk. 8/8 - 4 M ( tdk ketam ) M³ M.181.h 2,194,720.00
22 Ky. klas II Mabang uk. 8/8 - 4 M ( ketam ) M³ M.181.i 3,293,620.00
23 Ky. klas II Mabang uk. 7/7 - 4 M ( tdk ketam ) M³ - 3,724,160.00
24 Ky. klas II Mabang uk. 7/7 - 4 M ( ketam ) M³ - 3,168,550.00
25 Ky. klas II Mabang uk. 4/6 - 4 M ( tdk ketam ) M³ - 2,764,960.00
26 Ky. klas II Mabang uk. 5/7 - 4 M ( tdk ketam ) M³ - 1,883,750.00
27 Ky. klas II Mabang uk. 5/10 - 4 M ( tdk ketam ) M³ - 3,053,270.00
28 Ky. klas II Mabang uk. 6/10 - 4 M ( tdk ketam ) M³ - 3,244,010.00
29 Ky. klas II Mabang uk. 6/12 - 4 M ( tdk ketam ) M³ - 3,949,990.00
30 Ky. klas II Mabang uk. 4/8 - 4 M ( tdk ketam ) M³ - 4,109,820.00
31 Ky. klas II Mabang uk. 8/15 - 4 M ( tdk ketam ) M³ - 2,520,870.00
32 Ky. klas II Mabang uk. 8/12 - 4 M ( tdk ketam ) M³ - 4,947,360.00
33 Ky klas III uk. 3/5 - 4 M ( tdk ketam) M³ - 962,500.00
34 Ky klas III uk. 4/6 - 4 M ( tdk ketam) M³ - 2,046,110.00
35 Papan kayu klas II (mabang) tdk ketam M³ M.181.j 4,541,790.00
36 Papan kayu klas II (mabang) ketam M³ M.181.k 6,331,160.00
37 Papan kayu klas I tdk ketam M³ - 9,052,120.00
38 Papan kayu klas I ketam M³ - 7,562,500.00
39 Papan mal klas III M³ M.181.l 1,323,520.00
40 Papan Simpiran M³ - 604,780.00
41 Renglat kayu klas I uk 1/8 cm Btg - 19,360.00
42 Kayu profil 10cm Btg - 20,680.00
43 Kayu cerucuk /dolken ø 6 - 8 - Pj. 4 M Btg - 5,630.00
44 Kayu cerucuk /dolken ø10 - Pj. 4 M Btg - 10,450.00
45 Kayu cerucuk /dolken ø12 - Pj. 12 M Btg - 66,000.00
46 Kayu cerucuk /dolken ø 15 - Pj. 12 M Btg - 82,500.00
47 Kayu Simpiran / Bakar M³ - 181,500.00
48 Alas kayu hutan Btg - 16,500.00

D. BAHAN CAT
1 Amplas Lbr - 2,310.00
2 Minyak cat Kg - 27,940.00
3 Cat kilat Kg - 42,130.00
4 Plamur Kg - 29,480.00
5 Cat dasar Kg - 33,000.00
6 Cat tembok Kg - 36,520.00
7 Cat tembok type weather shield Kg - 40,260.00
8 Cat tembok type weather coat (acrylic) Kg - 80,080.00
9 Cat seng Kg - 42,900.00
10 Dempul Kg - 27,940.00
11 Plitur Kg - 39,160.00
12 Thiner Ltr M.090.f 22,990.00
13 Thiner ND Ltr - 32,450.00
14 Melamic Ltr - 56,540.00
15 Vernis Ltr - 30,910.00
16 Meni Kg - 44,220.00
17 Oker Kg - 55,820.00
18 Lem Kayu Kg - 20,400.00
19 Sealent Tube - 137,500.00
20 Soda Api Kg - 11,660.00
21 Sabun / cream pembersih kotoran Kg - 20,350.00
22 Teak Oil Ltr - 44,000.00
23 Ter / Residu Ltr - 25,300.00
24 Kuas 4" Bh - 17,710.00
25 Road Line Paint ( Cat Marka ) Ltr M.090.e 49,500.00
26 Glass Bit Kg M.090.g 36,520.00
27 Weatherbond Emulsion ( cat kerb ) Kg M.090.h 79,200.00
HARGA TERMASUK
NO MATERIAL SATUAN KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

28 Termoplast Kg - 34,100.00

E. BAHAN BESI DAN ALUMINIUM


1 Besi Tulangan Beton Kg M.167 15,510.00
2 Besi wire mesh ø 5 Kg - 17,710.00
3 Kawat baja/bendrat Kg M.168 18,700.00
4 Simpai roll Kg - 20,900.00
5 Kawat simpai Kg - 26,620.00
6 Baut dia 4/8 " pj = 20 cm Btg M.163 8,250.00
7 Besi Penahan bh - 11,550.00
8 Beugel plat L. 3 cm bh - 38,500.00
9 Plat 1,2 x 2,4 x 12 Bh - 445,500.00
10 Besi Konstruksi (I, H) Kg - 17,930.00
11 Besi Konstruksi ( C ) Kg - 18,590.00
12 Besi Konstruksi (siku ) Kg - 18,590.00
13 Kawat Las Btg - 5,500.00
HARGA TERMASUK
NO MATERIAL SATUAN KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

14 Kawat Las Kg - 110,000.00


15 Kawat harmonika M² - 27,500.00
16 Kawat kasa M² - 13,750.00
17 Pipa galvanis dia 3/4" Btg - 148,610.00
18 Pipa galvanis dia 1/2" Btg - 121,880.00
19 Pipa galvanis dia 1" Btg - 191,510.00
20 Pipa galvanis dia 1 1/4" Btg - 269,830.00
21 Pipa galvanis dia 1 1/2" Btg - 312,730.00
22 Pipa galvanis dia 2" Btg - 384,450.00
23 Pipa galvanis dia 3" Btg - 614,350.00
24 Pipa galvanis dia 4" Btg - 437,580.00
25 Folding gate M² - 550,000.00
26 Rangka Aluminium 1 1/2" x 3" Meter - 82,500.00
27 Rangka Aluminium 1 3/4" x 4" Meter - 105,600.00
28 Pintu Aluminium std IKP, lengkap 4" Unit - 2,392,500.00
29 Rangka Baja Ringan Zincalume (truss/color) + Pemasangan M² - 253,000.00
30 Rangka Baja Ringan Zincalume (truss/polos) + Pemasangan M² - 165,000.00
31 Alumatek Unit - 2,090,000.00

F. BAHAN PENGANTUNG
1 Pintu Plastik untuk WC Bh - 302,500.00
2 Kait angin Bh - 14,850.00
3 Handle Jendela Bh - 16,500.00
4 Handle Pintu Bh - 110,000.00
5 Engsel jendela Bh - 24,750.00
6 Engsel pintu Bh - 33,000.00
7 Slot pintu Bh - 20,350.00
8 Slot jendela Bh - 11,550.00
9 Kunci tanam 2 slag (setaraf Belluci) Bh - 184,250.00
10 Kunci tanam 1 slag Bh - 118,250.00
11 Kunci tanam antik Bh - 179,020.00
12 Kunci tanam biasa Bh - 86,900.00
13 Kunci silinder Bh - 107,250.00
14 Door Closer Bh - 123,750.00
15 Door Stoper Bh - 22,000.00
16 Paku Seng Kg M.166.a 24,530.00
17 Paku campuran 1" - 5 " Kg M.166.b 20,900.00
18 Paku beton Kg - 27,500.00
19 Paku Atap Seng Kg M.166.c 27,500.00
20 Paku triplek Kg - 28,870.00
21 Paku GRC Kg - 28,870.00
22 Paku Zincallume Kg - 38,500.00
23 Sekrup Gypsum Kg - 66,000.00
24 Sekrup Fixer Bh - 330.00
25 Engsel Angin Bh - 11,000.00

G. BAHAN ATAP
1 Sirap belian Lbr - 5,500.00
2 Asbes Lbr - 55,000.00
3 Eternit M² - 71,500.00
4 Genteng Metal Type Prima 0.35 Lbr - 69,630.00
5 Genteng Metal Type Royal 0.35 Lbr - 69,630.00
6 Genteng Metal Type Classic 0.35 Lbr - 67,320.00
7 Genteng Metal Stone ( Type Classic 0.35 ) Lbr - 88,880.00
8 Genteng Metal Stone ( Type Prima 0.35 ) Lbr - 88,880.00
9 Atap Metal Supersheet 0.35 (polos) M' - 93,500.00
10 Atap Metal Supersheet 0.35 (polos) M² - 116,930.00
11 Atap Trim Deck 0.3 (polos) M² - 104,530.00
12 Atap Trim Deck 0.33 (color) M² - 117,420.00
13 Nok bubungan genteng metal 1/2 lingkaran 0.35 (pj 40cm) Bh - 71,500.00
14 Nok bubungan genteng metal stone 1/2 lingkaran 0.35 (pj 40cm) Bh - 88,000.00
15 Nok bubungan genteng metal kotak 0.35 M' - 85,360.00
16 Nok bubungan genteng metal stone kotak 0.35 M' - 101,200.00
17 Nok bubungan Trim Deck (polos) M' - 114,400.00
18 Nok bubungan Trim Deck (color) M' - 128,700.00
19 Seng Gelombang Bjls 30 Lbr - 71,390.00
20 Seng Gelombang Bjls 20 Lbr - 51,370.00
21 Seng Plat Bjls 20 Lbr - 52,800.00
22 Seng Plat Bjls 30 Lbr - 71,500.00
23 Seng Plat Bjls 30 (lebar 45 cm) M' - 20,900.00
24 Plat Datar Color 0.35 Lbr - 60,500.00
25 Zincalume Gelombang Persegi 0.35 (polos) M² - 114,120.00
26 Zincalume Gelombang Persegi 0.30 (polos) M² - 100,370.00
27 Zincalume Gelombang Persegi 0.35 (color) M² - 127,870.00
28 Zincalume Gelombang Persegi 0.30 (color) M² - 114,120.00
29 Zincalume Plat 0.2 Lbr - 130,900.00
30 Aluminium Foil M² - 55,000.00

H. BAHAN KACA
HARGA TERMASUK
NO MATERIAL SATUAN KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

1 Kaca Polos, t = 5 mm M² - 109,450.00


2 Kaca Polos, t = 12mm M² - 422,400.00
3 Kaca Rayben, t = 5 mm M² - 146,300.00
4 Kaca Cermin t = 3mm M² - 156,750.00
5 Kaca Patri M² - 1,045,000.00
6 Sealent Kg - 111,650.00
7 Nako + Bingkai (80 x 15) x 10 daun polos Bh - 214,500.00
8 Nako + Bingkai (80 x 15) x 10 daun rayben Bh - 225,500.00
9 Kaca Es M² - 167,200.00

I. BAHAN TRIPLEK
1 Triplek t = 3 mm Lbr - 60,500.00
2 Triplek t = 6 mm Lbr - 133,100.00
3 Triplek t =9 mm Lbr - 165,000.00
4 Multiplek t = 10 mm Lbr - 187,000.00
5 Multiplek t = 12 mm Lbr - 222,200.00
HARGA TERMASUK
NO MATERIAL SATUAN KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

6 Plywood 4' x 8' x 4mm Lbr - 109,340.00


7 Panel GRC 120 x 240 x 40 Lbr - 64,900.00
8 GypsumBoard t = 9mm Lbr - 67,100.00

J. BAHAN SANITASI
1 Kloset duduk monoblok Bh - 1,705,000.00
2 Kloset duduk putih (setaraf TOTO) Bh - 2,145,000.00
3 Kloset duduk warna (setaraf TOTO) Bh - 2,343,000.00
4 Kloset jongkok (setaraf TOTO) Bh - 204,600.00
5 Kloset jongkok (setaraf INA) Bh - 137,500.00
6 Kran air uk 1/2" Bh - 38,500.00
7 Pipa paralon dia 1/2" Btg - 17,820.00
8 Pipa paralon dia 3/4" Btg - 27,670.00
9 Pipa paralon dia 1" Btg - 40,700.00
10 Pipa paralon dia 2" Btg - 61,820.00
11 Pipa paralon dia 3" Btg - 117,150.00
12 Pipa paralon dia 4" Btg - 154,000.00

K. BAHAN MINYAK (TANPA KEUNTUNGAN)


1 Minyak solar Ltr M.183 4,500.00
2 Minyak solar industri Ltr - 5,750.00
3 Bensin premium Ltr M.184 5,600.00
4 Minyak pelumas Ltr M.185 24,200.00
5 Oli BEO 154W40/Cat Ltr - 42,400.00
6 Minyak tanah Ltr M.064 5,100.00
7 Minyak tanah industri Ltr - 6,100.00
8 Gas Elpiji Kg - 8,300.00
9 Alat-alat bantu Set M.170 57,000.00
10 Sewa Alat Untuk Pengelasan Jam - 62,500.00
11 Sewa Molen Set - 150,000.00
12 Sewa kuali termasuk angkutan Set - 63,300.00

L. BAHAN ALAT-ALAT LISTRIK


1 Armatur lampu High Mass Holovent 400 watt (lengkap) Unit 13,167,000.00
2 Armatur lampu SGP 338 / SONT 400 Watt Unit - 5,458,530.00
3 Armatur lampu SGP 328 / SONT 250 Watt Unit - 3,724,980.00
4 Armatur lampu SGP 338 / SONT 400 Watt (lengkap) Unit - 5,105,100.00
5 Armatur lampu SGP 368 / SONT 250 Watt (lengkap) Unit - 4,274,980.00
6 Armatur lampu LVD 100 Watt (lengkap) Unit - 4,939,000.00
7 Armatur lampu Ekorola TRX 800 - 20 Watt (set) Set - 544,500.00
8 Armatur lampu Sorot HPIT 250 Watt (lengkap) Set - 6,675,900.00
9 Sorot HPIT 250 watt (lengkap) Set - 5,563,250.00
10 XKS SON T 250 watt (lengkap) Set - 3,599,750.00
11 Tiang Artagonal Cabang 2 T = 11 M Tiang - 7,754,900.00
12 Tiang Artagonal Cabang 1 T = 11 M Tiang - 6,805,880.00
13 Tiang Oktagonal Cabang 2 T = 11 M Btg - 7,237,010.00
14 Tiang Oktagonal Cabang 1 T = 11 M Btg - 7,601,000.00
15 Tiang high mass 22 m cab. 5 ring Tiang - 67,217,150.00
16 Tiang high mass 22 m cab. 4 ring Tiang - 80,659,700.00
17 Tiang lampu oktagonal 11 m Btg - 10,838,520.00
18 Tiang lampu oktagonal 12 m Btg - 12,362,130.00
19 Tiang lampu oktagonal cab. 4 Ring 12 Mtr Btg - 10,838,300.00
20 Tiang lampu oktagonal cab. 2 (11m) Btg - 11,388,300.00
21 Stang Ornamen Galvanis dia 2" Pj. 7 M + Klem Tiang Btg - 983,010.00
22 Stang Ornamen Galvanis dia 2" Pj. 6 M + Klem Tiang Btg - 982,980.00
23 Stang Ornamen Galvanis dia 2" Pj. 5 M + Klem Tiang Btg - 915,200.00
24 Stang Ornamen Galvanis dia 2" Pj. 3 M + Klem Tiang 12 - 682,000.00
25 Stang Ornamen Galvanis dia 2" Pj. 2 M + Klem Tiang Btg - 517,000.00
26 Box Panel PJU Uk. 60x90x30 Cm lengkap Time Swich Set - 4,664,000.00
27 Box Panel PJU Uk. 50x45x25 Cm lengkap Time Swich Set - 3,376,170.00
28 Box KWH Meter Uk. 35 x 50 x 25 cm Buah - 797,500.00
29 Traffo HPL 400 Watt Buah - 249,700.00
30 Traffo HPL 250 Watt Buah - 202,030.00
31 Traffo HPL 125 Watt Buah - 124,850.00
32 Traffo SOX 135 Watt Buah - 842,870.00
33 Traffo SOX 180 Watt Buah - 842,870.00
34 Traffo SON T 400 Watt Buah - 459,430.00
35 Traffo SON T 250 Watt Buah - 374,360.00
36 Traffo SON T 125 Watt Buah - 248,320.00
37 Traffo SON T 70 Watt Buah - 144,550.00
38 Traffo SON H 400 Watt Buah - 409,290.00
39 Traffo SON H 250 Watt Buah - 280,950.00
40 Traffo SON H 125 Watt Buah - 248,320.00
41 Traffo SON H 70 Watt Buah - 148,220.00
42 Traffo HPiT 400 Buah - 270,500.00
43 Traffo Neon 40 Watt Buah - 19,610.00
44 Traffo Neon 20 Watt Buah - 16,360.00
45 Traffo Neon 10 Watt Buah - 14,390.00
46 HPL 400 Watt Buah - 202,950.00
HARGA TERMASUK
NO MATERIAL SATUAN KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

47 HPL 250 Watt Buah - 148,310.00


48 HPL 125 Watt Buah - 70,210.00
49 SOX 135 Watt Buah - 485,550.00
50 SOX 180 Watt Buah - 485,550.00
51 MLL 160 Watt Buah - 70,210.00
52 Bola SON T 1000 Watt Buah - 742,500.00
53 Bola SON T 400 Watt Buah - 336,600.00
54 Bola SON T 250 Watt Buah - 324,500.00
55 Bola SON T 125 Watt Buah - 248,320.00
56 Bola Lampu SON 70 Watt Buah - 168,520.00
57 SON H 400 Watt Buah - 280,950.00
58 SON H 250 Watt Buah - 280,950.00
59 SON H 125 Watt Buah - 248,320.00
60 SON H 70 Watt Buah - 140,430.00
HARGA TERMASUK
NO MATERIAL SATUAN KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

61 Bola Lampu HPIT 400 Watt Buah - 336,600.00


62 HPIT 400 Watt Buah - 324,610.00
63 Seri 200 Biji Kotak - 55,450.00
64 Seri Kuning Kotak - 55,450.00
65 Neon Sen Meter - 41,620.00
66 Pijar 5 Watt Buah - 2,100.00
67 Pijar 20 Watt Buah - 3,480.00
68 Pijar 25 Watt Buah - 3,480.00
69 Pijar 40 Watt Buah - 3,480.00
70 Pijar 60 Watt Buah - 4,950.00
71 Pijar 75 Watt Buah - 4,950.00
72 Pijar 80 Watt Buah - 3,940.00
73 Pijar 100 Watt Buah - 6,230.00
74 Pijar 200 Watt Buah - 13,840.00
75 Neon 40 Watt Buah - 13,100.00
76 Neon 20 Watt Buah - 9,070.00
77 Neon 10 Watt Buah - 5,220.00
78 Lampu Ekorola TRX 800 - 20 watt (set) Set - 538,080.00
79 Lampu Light Grick Buah - 131,810.00
80 Lampu Genite 16 Watt Buah - 41,610.00
81 Lampu XL 14 Watt Buah - 34,650.00
82 Lampu Sorot 300 Watt Buah - 137,500.00
83 Lampu Nepalos 25 Watt Buah - 34,650.00
84 Lampu Superlox 25 Watt Buah - 5,500.00
85 Lampu Superlox 40 Watt Buah - 6,230.00
86 Lampu Fisikom 25 Watt Buah - 34,650.00
87 Lampu Fisikom 23 Watt Buah - 34,650.00
88 Lampu Fisikom 18 Watt Buah - 27,770.00
89 Lampu Mercury 125 Watt Buah - 70,210.00
90 Lampu Mercury 250 Watt Buah - 148,220.00
91 Lampu Sunyco 45 Watt Buah - 83,230.00
92 Lampu Matsuka 8 Watt Buah - 20,800.00
93 Lampu Matsuka 14 Watt Buah - 22,180.00
94 Lampu Matsuka 18 Watt Buah - 31,900.00
95 Lampu Matsuka 20 Watt Buah - 37,490.00
96 Lampu Matsuka 25 Watt Buah - 38,860.00
97 Lampu Par 38 Watt Buah - 51,330.00
98 Lampu Taman Buah - 34,650.00
99 SL 15 Watt Buah - 115,500.00
100 SL 18 Watt Buah - 44,990.00
101 SL 25 Watt Buah - 58,190.00
102 TL Rina 32 Watt Buah - 27,680.00
103 Bola Essetial Buah - 33,360.00
104 Bola Spot Light Buah - 51,970.00
105 Bola Lampu Sorot 300 Watt Buah - 137,500.00
106 Hologen 500 Watt Buah - 40,240.00
107 Hologen 1.000 Watt Buah - 79,100.00
108 Hologen 1.500 Watt Buah - 90,100.00
109 NYY 1 x 1.5 mm Meter - 2,970.00
110 NYY 1 x 2.5 mm Meter - 4,620.00
111 NYY 1 x 4 mm Meter - 7,260.00
112 NYY 1 x 6 mm Meter - 11,220.00
113 NYY 2 mm Meter - 6,140.00
114 NYY 2 x 2.5 mm Meter - 12,210.00
115 NYY 2 x 4 mm Meter - 17,500.00
116 NYY 2 x 6 mm Meter - 16,610.00
117 NYY 2 x 10 mm Meter - 21,900.00
118 NYY 3 x 4 mm Meter - 23,740.00
119 NYY 4 x 2.5 mm Meter - 23,430.00
120 NYY 4 x 4 mm Meter - 34,650.00
121 NYY 4 x 6 mm Meter - 56,260.00
122 NYY 4 x 10 mm Meter - 76,560.00
123 NYY 4 x 16 mm Meter - 65,900.00
124 NYY 4 x 25 mm Meter - 273,350.00
125 NYY 4 x 35 mm Meter - 305,250.00
126 NYY 4 x 50 mm Meter - 374,550.00
127 NYY 4 x 70 mm Meter - 134,560.00
128 NYYFYGBY 4 x 6 mm Meter - 86,680.00
129 NYYFYGBY 4 x 10 mm Meter - 127,930.00
130 NYN 2 x 2,5 mm Meter - 6,500.00
131 NYN 3 x 1,5 mm Meter - 5,950.00
132 NYN 3 x 2,5 mm Meter - 7,880.00
133 NYA 1 x 1,5 mm Meter - 2,970.00
134 NYA 1 x 2,5 mm Meter - 4,620.00
135 NYA 1 x 4 mm Meter - 7,260.00
136 NYA 1 x 6 mm Meter - 11,220.00
137 NYA 2 x 2,5 mm Meter - 12,210.00
138 NYA 2 x 4 mm Meter - 17,600.00
139 NYA 2 x 30 mm Meter - 12,280.00
HARGA TERMASUK
NO MATERIAL SATUAN KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

140 NYA 4 x 6 mm Meter - 22,820.00


141 NYA 1,5 mm Meter - 1,370.00
142 NYA 4 mm Meter - 3,570.00
143 NYA 10 mm Meter - 8,700.00
144 NYA 16 mm Meter - 2,380.00
145 NYF6BY 4 x 10 mm Meter - 60,500.00
146 NYF6BY 4 x 16 mm Meter - 88,270.00
147 NYF6BY 4 x 25 mm Meter - 122,100.00
148 NYF6BY 4 x 35 mm Meter - 155,370.00
149 NYF6BY 4 x 50 mm Meter - 199,740.00
150 NYF6BY 4 x 70 mm Meter - 271,970.00
151 NYM 4 mm Meter - 3,570.00
152 NYM 3 x 4 mm Meter - 19,700.00
153 NYM 2 x 2 mm Meter - 5,950.00
154 NYM 2 x 4 mm Meter - 14,660.00
HARGA TERMASUK
NO MATERIAL SATUAN KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

155 NYM 2 x 2,5 mm Meter - 10,170.00


156 NYM 2 x 1,5 mm Meter - 4,400.00
157 NYM 3 x 1,5 mm Meter - 5,500.00
158 NYM 3 x 2,5 mm Meter - 7,880.00
159 NYM 3 x 10 mm Meter - 27,680.00
160 NYM 4 x 2,5 mm Meter - 10,080.00
161 NYM 4 x 4 mm Meter - 25,480.00
162 NYMHYM 2 x 0,75 mm Meter - 3,110.00
163 NYMHYM 2 x 1,5 mm Meter - 5,310.00
164 Traffo SON T 1000 Watt Buah - 929,500.00
165 Traffo SON T 400 Watt Buah - 551,320.00
166 Traffo SON T 250 Watt Buah - 449,240.00
167 Traffo SON T 70 Watt Buah - 173,470.00
168 Kabel Snur Roll - 55,450.00
169 Kabel Tester Meter - 27,680.00
170 Kabel Box Meter - 55,450.00
171 Kabel Mic Transparan Roll - 180,300.00
172 Kabel 3 x 2,5 mm Meter - 7,880.00
173 Kabel Antena Roll - 34,650.00
174 Kabel H / M Meter - 2,010.00
175 Kabel Transparan Meter - 2,750.00
176 Kabel Telepon Meter - 1,650.00
177 Kabel TC 2 x 10 mm Meter - 7,090.00
178 Kabel TC 2 x 16 mm Meter - 9,900.00
179 Box TL 20 Watt Buah - 8,250.00
180 Box MCB 1 Group Buah - 4,120.00
181 Cal Gulung Buah - 55,450.00
182 Contactor 100 A Buah - 1,106,050.00
183 Conector Buah - 7,970.00
184 Dop 3" Buah - 6,960.00
185 Esensial Buah - 34,650.00
186 Fitting Gantung Buah - 1,460.00
187 Fitting Duduk Buah - 3,480.00
188 Fitting Atom Buah - 27,770.00
189 Fitting Gantung E 27 Buah - 17,440.00
190 Fitting Duduk E 27 Buah - 17,440.00
191 Fitting Duduk E 40 Buah - 22,110.00
192 Fitting Hologen Buah - 27,770.00
193 Full Breket Buah - 12,500.00
194 Gulung Spul Buah - 69,390.00
195 Gulung Coil Contactor Buah - 69,390.00
196 Isolasi Unibel Buah - 4,950.00
197 Icnitor SN 58 Buah - 99,880.00
198 Inector Buah - 83,230.00
199 Ignator Buah - 55,500.00
200 Indiktor Buah - 130,160.00
201 Insuluk Buah - 320.00
202 Kapasitor Buah - 156,200.00
203 Kap Hijau E 27 Buah - 27,500.00
204 Kap Hijau E 40 Buah - 44,000.00
205 Kap Lampu Buah - 97,070.00
206 Kap To2 Buah - 97,070.00
207 Kop Skring Buah - 4,190.00
208 Klem Tiang Buah - 11,130.00
209 k. Skum 10-8 Buah - 840.00
210 MCB 1.A Buah - 13,880.00
211 MCB 2.A Buah - 13,880.00
212 MCB 25 A Buah - 13,880.00
213 MCB 63 A Buah - 124,850.00
214 MCB 40 A Buah - 52,700.00
215 MCB 45 A Buah - 52,700.00
216 MCB 50 A Buah - 235,620.00
217 MCB 10 A Buah - 68,000.00
218 MCB 16 A Buah - 34,650.00
219 MCB 6 A Buah - 34,650.00
220 MCB 2 A Buah - 13,880.00
221 MCB 4 A Buah - 34,650.00
222 MCB 32 A Buah - 34,650.00
223 MCB Box Buah - 3,480.00
224 Multi Tester Buah - 62,420.00
225 MC Se-3 N Buah - 911,620.00
226 Macon Mec gmg-50 aC Buah - 499,490.00
227 Magnetic Contactor 100 A Buah - 1,327,260.00
228 NH Fuse 80 A Buah - 25,000.00
229 Ornamen Pijar Buah - 48,560.00
230 Ornamen Gantung Buah - 48,560.00
231 Obeng Plus Buah - 19,610.00
232 Obeng Minus Buah - 19,610.00
233 Open Steker Buah - 2,090.00
HARGA TERMASUK
NO MATERIAL SATUAN KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

234 On - Off Buah - 6,270.00


235 Pat 38 Buah - 52,020.00
236 Solar Seal / Photo Seal Buah - 124,850.00
237 Opstic 1/2" lengkap klem Batang - 229,070.00
238 Pipa Paralon 1/2" Batang - 7,650.00
239 Pipa L 1/2" Batang - 2,090.00
240 Pipa Paralon 1' Batang - 9,020.00
241 Pipa Paralon 3/4" Batang - 8,340.00
242 Pipa Paralon 3' Batang - 16,680.00
243 Pipa PVC 1,5" Batang - 43,490.00
244 Pipa PVC Galvanis 1,5" Batang - 149,990.00
245 Pipa Besi Batang - 83,230.00
246 Pipa Galvanis Batang - 97,120.00
247 Pipa ornamen dia 2" x 2m Batang - 438,530.00
248 Pipa ornamen dia 2" x 3m lengkap klem Batang - 569,430.00
249 Pipa ornamen dia 2" x 6m lengkap klem Batang - 1,145,370.00
HARGA TERMASUK
NO MATERIAL SATUAN KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

250 Pipa ornamen dia 2" x 7m lengkap klem Batang - 1,276,270.00


251 Pondasi tiang lampu oktagonal (11 meter) Unit - 1,439,900.00
252 Pres Conector Buah - 2,810.00
253 Rangka Ring 32 Watt Buah - 13,840.00
254 Rel MCB Buah - 20,800.00
255 Roset Telpon Buah - 4,900.00
256 Saklar Double Buah - 6,280.00
257 Saklar Engkel Buah - 4,300.00
258 Saklar Tripel Buah - 16,680.00
259 Spul Contactor Buah - 55,450.00
260 Sekring 63 A Buah - 9,020.00
261 Solder Pistol Buah - 305,250.00
262 Solder Buah - 20,800.00
263 Solar Seal / Photo Seal Buah - 124,850.00
264 Stop Kontak Buah - 4,190.00
265 Steker Arde Buah - 8,340.00
266 Steker T Buah - 9,710.00
267 Steker PH Buah - 2,810.00
268 Sadel No. 6 Bungkus - 980.00
269 Sadel No. 8 Bungkus - 1,300.00
270 Sadel No. 9 Bungkus - 1,440.00
271 Sadel No. 10 Bungkus - 3,850.00
272 Sadel No. 12 Bungkus - 4,950.00
273 Sadel No. 14 Bungkus - 2,810.00
274 Sadel No. 19 Bungkus - 4,190.00
275 Sadel No. 22 Bungkus - 8,370.00
276 Skun RS-16 Buah - 980.00
277 Stater Buah - 2,810.00
278 Ston 63 A Buah - 124,880.00
279 Stost 40 A + Ip Buah - 52,750.00
280 Stost 32 A + Ip Buah - 34,680.00
281 Tedus Hitam Buah - 710.00
282 Tali Tester Buah - 20,800.00
283 Tang Amper Buah - 901,900.00
284 Tang Buaya Buah - 27,750.00
285 Tang Potong Buah - 27,750.00
286 Tang Kombinasi Buah - 27,750.00
287 Tang Jepit Buah - 27,750.00
288 Tang Skun Buah - 277,500.00
289 Time Swicht Theben Buah - 592,180.00
290 Taping Buah - 457,870.00
291 Taping Conector 1 baut Buah - 10,690.00
292 Taping Conector 2 baut Buah - 17,440.00
293 Tespen Buah - 6,920.00
294 Timah Solder Buah - 20,800.00
295 Terminal 25 ml Buah - 34,690.00
296 Tolkit Buah - 62,420.00
297 Wedge Klem Buah - 4,190.00
298 Wide Klem Buah - 6,420.00
299 WD 40 Buah - 34,690.00
300 Klem Tiang uk. 5" s/d 8" x 2" Set - 192,500.00

M. ALAT-ALAT PEMADAM KEBAKARAN


1 Helm pemadam kebakaran Buah - 630,850.00
2 Baju tahan panas Buah - 7,150,000.00
3 Baret lengkap Buah - 55,000.00
4 Celana tahan api Buah - 6,050,000.00
5 Sepatu pemadam Pasang - 550,000.00
6 Sarung tangan Pasang - 366,850.00
7 Chainsaw Buah - 8,800,000.00
8 Dahrem Buah - 66,000.00
9 Handy Talky Buah - 2,750,000.00
10 Tali pengaman Buah - 165,000.00
11 Kapak Pemadam Buah - 330,000.00
12 Kopel rem Buah - 49,500.00
13 Y Connection 1.5" Buah - 4,950,000.00
14 Y Connection 2.5" Buah - 5,500,000.00
15 Pilar Hydrant Unit - 5,390,000.00
16 Nozzle multi spray jet 1.5' Buah - 8,250,000.00
17 Nozzle multi spray jet 2.5' Buah - 8,800,000.00
18 Selang pemadan uk. 1.5 " x 20m
Roll - 3,025,000.00
+ Machino Coupling
19 Selang pemadan uk. 2.5 " x 20m
Roll - 3,245,000.00
+ Machino Coupling
20 Tac stick (alat pendeteksi kebocoran listrik) Buah - 10,560,000.00
21 Hydrant tester (alat ukur hydrant) - 9,680,000.00
22 Tabung pernapasan
Unit - 17,875,000.00
(continued breathing aparatus)
23 Floating Pump (pompa apung) Unit - 91,208,370.00
24 Hydrant Pillar Two Way 2,5" Machino Unit - 5,225,000.00
25 Tabung Apar 3 Kg Unit - 733,330.00
26 Tabung Apar 6 Kg Unit - 1,100,000.00
27 Sepeda Motor 110 cc Unit - 11,000,000.00
28 Sepeda Motor (Modifikasi) Unit - 17,416,660.00
29 Repiter Unit - 38,700,470.00
30 Mesin DF (Daug Feng) Unit - 5,500,000.00
31 Pump Niagara Unit - 9,533,330.00

WAKIL WALIKOTA PONTIANAK


HARGA TERMASUK
NO MATERIAL SATUAN KODE KEUNTUNGAN
(OVERHEAD)
(Rp)

TERTANDA

PARYADI, S.Hut

Untuk salinan sesuai dengan bunyi aslinya


SEKRETARIS DAERAH KOTA PONTIANAK

Ir. H. TONI HERIANTO, MT


Pembina Utama Muda
NIP. 19541129 198003 1 016
REKAPITULASI
RENCANA ANGGARAN BIAYA

PEKERJAAN : PEMBANGUNAN MASJID SAFINATUL ISLAM


LOKASI : KUBU RAYA
TAHUN ANGGARAN : 2021

NO. URAIAN PEKERJAAN BIAYA

I. PEKERJAAN PENDAHULUAN 7,201,249.90

II. PEKERJAAN TANAH, PONDASI DAN LANTAI DASAR 396,004,469.96

III. PEKERJAAN STRUKTUR BETON BERTULANG 1,192,552,891.31

IV. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 258,828,186.76

V. PEKERJAAN DINDING DAN PLESTERAN 76,741,844.86

VI. PEKERJAAN LANTAI KERAMIK 237,906,000.00

VII. PEKERJAAN PLAFOND 64,676,677.52

VIII. PEKERJAAN PENGECATAN DAN FINISHING DINDING 106,463,093.93

IX. PEKERJAAN KUSEN PINTU DAN JENDELA 52,786,400.00

X. PEKERJAAN INSTALASI PENERANGAN 20,650,000.00

XI. PEKERJAAN LAIN-LAIN 64,160,000.00

A. JUMLAH ( I s/d XI ) 2,477,970,814.23

B. PEMBULATAN 2,477,000,000.00

TERBILANG :

DUA MILYAR EMPAT RATUS TUJUH PULUH TUJUH JUTA RUPIAH


Rencana Anggaran Biaya (RAB)
PEKERJAAN : PEMBANGUNAN MASJID SAFINATUL ISLAM
LOKASI : KUBU RAYA
TAHUN ANGGARAN : 2021

HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME JUMLAH HARGA (Rp.)
(Rp.)

I. PEKERJAAN PENDAHULUAN
1. Pembersihan lokasi ls 2,000,000.00 2,000,000.00
2. Pemasangan Bowplank 86.00 m1 60,479.65 5,201,249.90
Jumlah I 7,201,249.90
II. PEKERJAAN TANAH, PONDASI DAN LANTAI
1. Galian Tanah Pondasi 212.80 m3 95,018.75 20,219,990.00
2. Pondasi Cerucuk dia. 15 cm - 12 meter 832.00 btg 100,000.00 83,200,000.00
3. Urugan Pasir di bawah pondasi, t = 15 cm 21.50 m3 210,507.50 4,526,753.28
4. Lantai Kerja Beton K-125, t = 5 cm 7.17 m3 1,221,331.79 8,754,506.29
5. Pelat Pondasi Beton Bertulang
a. Pondasi P1
- Beton K-225 38.86 m3 1,384,583.12 53,810,438.18
- Tulangan 2,051.44 kg 18,772.03 38,509,622.90
- Bekisting 132.16 m2 209,556.45 27,694,980.43
6. Kolom Pondasi Beton Bertulang
a. Kolom Pondasi P1 (400mm x 400 mm)
- Beton K-225 8.51 m3 2,193,936.65 18,674,788.76
- Tulangan 2,090.44 kg 10,600.00 22,158,622.62
- Bekisting 17.02 m2 414,288.65 7,052,849.98
7. Urugan Tanah Kembali 127.68 m3 31,672.92 4,043,998.00
8. Urugan Pasir di bawah lantai 129.07 m3 210,507.50 27,169,501.33
9. Cor Lantai Beton Tulangan
- Beton K-225 30.71 m3 2,193,936.65 67,381,279.36
- Tulangan Wiremesh M6 1 lapis 1,119.26 kg 10,600.00 11,864,134.80
- Bekisting 4.50 m2 209,556.45 943,004.03
Jumlah II 396,004,469.96
III. PEKERJAAN STRUKTUR BETON BERTULANG
1. Balok Sloof Beton Bertulang
a. Balok Sloof SF1 dan SF2 (250mm x 600mm)
- Beton K-225 23.72 m3 2,193,936.65 52,029,207.65
- Tulangan 2,415.10 kg 18,772.03 45,336,277.63
- Bekisting 53.94 m2 247,376.50 13,343,488.41
2. Kolom Beton Bertulang Lantai 1
a. Kolom K1 (400mm x 400mm)
- Beton K-225 24.13 m3 2,193,936.65 52,935,303.49
- Tulangan 2,890.53 kg 18,772.03 54,261,177.49
- Bekisting 48.26 m2 439,984.25 21,231,879.97
3. Balok Beton Bertulang Lantai 2
a. Balok B1 (250mm x 600mm)
- Beton K-225 17.29 m3 2,193,936.65 37,927,679.84
- Tulangan 1,936.20 kg 18,772.03 36,346,326.47
- Bekisting 28.81 m2 425,863.40 12,270,189.21
b. Balok B2 (150mm x 300mm)
- Beton K-225 2.61 m3 2,193,936.65 5,721,238.30
- Tulangan 529.56 kg 18,772.03 9,940,859.50
- Bekisting 6.37 m2 425,863.40 2,714,666.24
4. Pelat Beton Bertulang Lantai 2
- Beton K-225 38.58 m3 2,193,936.65 84,632,422.64
- Tulangan Wiremesh M8 2 lapis 4,930.57 kg 18,772.03 92,556,743.28
- Bekisting 111.46 m2 469,488.65 52,328,829.34
5. Kolom Beton Bertulang Lantai 2
a. Kolom K1 (400mm x 400mm)
- Beton K-225 35.36 m3 2,193,936.65 77,577,599.94
- Tulangan 2,182.23 kg 18,772.03 40,964,855.09
- Bekisting 83.20 m2 425,863.40 35,431,834.88
6. Balok Beton Bertulang Lantai 3
a. Balok B1 (250mm x 600mm)
- Beton K-225 20.58 m3 2,193,936.65 45,147,925.35
- Tulangan 3,320.38 kg 18,772.03 62,330,183.42
- Bekisting 40.35 m2 425,863.40 17,183,588.19
b. Balok B2 (150mm x 300mm)
- Beton K-225 4.50 m3 2,193,936.65 9,872,714.93
- Tulangan 947.41 kg 18,772.03 17,784,892.06
- Bekisting 15.00 m2 425,863.40 6,387,951.00
9. Ring Balok Beton Bertulang
Balok B2 (150mm x 300mm)
- Beton K-225 13.51 m3 2,193,936.65 29,647,762.92
- Tulangan 2,742.91 kg 18,772.03 51,490,025.40
- Bekisting 45.05 m2 425,863.40 19,183,016.85
10. Pelat Dak Beton Bertulang
Balok B2 (150mm x 300mm)
- Beton K-225 14.88 m3 2,193,936.65 32,634,807.67
- Tulangan Wiremesh M8 2 lapis1 921.03 kg 18,772.03 17,289,504.33
- Bekisting 37.69 m2 425,863.40 16,049,939.82
11. Tangga Beton Bertulang 4.00 unit 35,000,000.00 140,000,000.00
Jumlah III 1,192,552,891.31
IV. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP
1. Rangka Atap Konstruksi 960.00 kg 39,887.75 38,292,240.00
2. Penutp Atap Genteng Metal 92.00 m2 189,404.86 17,425,247.30
3. Listplank Kayu Klas I 149.60 m1 187,905.75 28,110,699.45
4. Kubah dia 9,9 m dan tinggi 5.9 m 1.00 unit 175,000,000.00 175,000,000.00
Jumlah IV 258,828,186.76
V. PEKERJAAN DINDING
1. Pemasangan Dinding Batako 153.40 m2 122,291.00 18,759,439.40
2. Plesteran Dinding 306.80 m2 77,176.50 23,677,750.20
3. Acian dinding 306.80 m2 65,000.00 19,942,000.00
4. Kolom Latei (Kolom Praktis) 81.40 m1 111,303.90 9,060,137.46
5. Balok Latei (Balok Praktis) 23.82 m1 222,607.80 5,302,517.80
Jumlah V 76,741,844.86
VI. PEKERJAAN LANTAI KERAMIK
1. Pasangan Keramik Lantai 472.52 m2 450,000.00 212,634,000.00
2. Pasangan Keramik Tangga 56.16 m1 450,000.00 25,272,000.00
Jumlah VI 237,906,000.00
VII. PEKERJAAN PLAFOND
1. Pamasang Rangka Plafond Baja Ringan 452.20 m2 75,000.00 33,915,000.00
2. Pemasangan Plafond Gyosum Board 9 mm 72.00 m2 59,805.06 4,305,964.32
3. Pemasangan Plafond GRC Board 4 mm 460.00 m2 57,512.42 26,455,713.20
Jumlah VII 64,676,677.52
VIII. PEKERJAAN PENGECATAN DAN FINISHING DINDING
1. Cat Tembok Exterior 345.00 m2 67,164.03 23,171,588.63
2. Cat Tembok Interior 212.00 m2 63,875.03 13,541,505.30
3. Finishing Gypsum Ornamen Exterior 155.00 m2 450,000.00 69,750,000.00
Jumlah VIII 106,463,093.93
IX. PEKERJAAN KUSEN PINTU DAN JENDELA
1. Pintu dan Jendela PJ1 1.00 unit 6,300,000.00 6,300,000.00
2. Pintu P1 2.00 unit 3,400,000.00 6,800,000.00
3. Pintu P2 4.00 unit 2,322,000.00 9,288,000.00
4. Jendela J1 4.00 unit 3,200,400.00 12,801,600.00
5. Jendela J2 8.00 unit 2,154,600.00 17,236,800.00
6. Ventilasi V1 2.00 unit 180,000.00 360,000.00
Jumlah IX 52,786,400.00
X. PEKERJAAN INSTALASI PENERANGAN
1. Instalasi Titik Lampu, Saklar dan Stop Kontak 32.67 ttk 250,000.00 8,166,666.67
2. LED Panel Outbow 12 watt 11.33 bh 175,000.00 1,983,333.33
3. LED Bulb 19 watt 8.00 bh 100,000.00 800,000.00
4. LED Bulb 9 watt 2.00 bh 80,000.00 160,000.00
5. Lampu Hias Gantung 19 watt 1.00 bh 5,500,000.00 5,500,000.00
6. Stop Kontak 1 Phasa 13 A 9.00 bh 50,000.00 450,000.00
7. Stop Kontak Atas (AC&WH) 7.00 bh 100,000.00 700,000.00
8. Saklar Tunggal 7.00 bh 50,000.00 350,000.00
9. Saklar Seri 9.00 bh 60,000.00 540,000.00
10. MCB Box 1.00 Unit 2,000,000.00 2,000,000.00
Jumlah X 20,650,000.00
XI. PEKERJAAN LAIN-LAIN
1. Pagar Teralis 117.60 m1 350,000.00 41,160,000.00
2. Instalasi Pembuangan Air Hujan 1.00 ls 8,000,000.00 8,000,000.00
3. Tulisan Nama Masjid 1.00 ls 15,000,000.00 15,000,000.00

Jumlah XI 64,160,000.00

JUMLAH ( I s/d XI ) 2,477,970,814.23


PERHITUNGAN VOLUME PEKERJAAN MASJID

I. PEKERJAAN PENDAHULUAN
1 Pembersihan Lapangan dan Perataan : 23.00 m x 20.00 m = 460.00 m2 460.00 m2
2 Pemasangan Bowplank 23.00 m + 23.00 m + 20.00 m + 20.00 m = 86.00 m1 86.00 m1

II. PEKERJAAN TANAH DAN PONDASI


1 Galian Tanah Pondasi 212.80 m3
Pondai P1 2.00 m x 2.00 m x 0.95 m x 56.00 bh = 212.80 m3
= 212.80 m3

2 Pondasi Cerucuk dia. 15 cm - 12 meter 832.00 btg


Pondai P1 1.00 brs x 52.00 klm x 16.00 bh = 832.00 btg
= 832.00 btg

3 Urugan Pasir di bawah pondasi 21.50 m3


Pondai P1 1.60 m x 1.60 m x 0.15 m x 56.00 bh = 21.50 m3
= 21.50 m3

4 Lantai Kerja Beton K-125 7.17 m3


Pondai P1 1.60 m x 1.60 m x 0.05 m x 56.00 bh = 7.17 m3
= 7.17 m3
5 Pelat Pondasi Beton Bertulang
Pondasi P1
Beton K-225 38.86 m3
1.60 m x 1.60 m x 0.25 m x 56.00 bh = 35.84 m3
0.60 m x 0.60 m x 0.15 m x 56.00 bh = 3.02 m3
= 38.86 m3

Tulangan 2,564.30 kg
D 16 mm Berat = 1.579 kg/m
1.92 m x 2.00 = 3.84 m
0.17 m x 2.00 = 0.34 m
0.10 m x 2.00 = 0.20 m
= 4.38 m x 6.00 bh x 56.00 bh = 1,471.68 m1
0.52 m x 1.00 = 0.52 m
0.32 m x 2.00 = 0.64 m
0.10 m x 2.00 = 0.20 m
= 1.36 m x 2.00 bh x 56.00 bh = 152.32 m1
= 1,624.00 m1

1,624.00 m1 x 1.579 kg/m = 2,564.30 kg

Bekisting 132.16 m2
2.00 m x 0.25 m x 4.00 bh x 56.00 bh = 112.00 m2
0.60 m 0.15 m x 4.00 bh x 56.00 bh = 20.16 m2
= 132.16 m2

6 Kolom Pondasi Beton Bertulang


Kolom Pondasi P1 (400 mm x 400 mm)
Beton K-225 8.51 m3
0.40 m x 0.40 m x 0.95 m x 56.00 bh = 8.51 m3
= 8.51 m3

Tulangan 2,613.05 kg
D 16 mm Berat = 1.579 kg/m
1.99 m x 1.00 = 1.99 m
0.30 m x 1.00 = 0.30 m
= 2.29 m x 12.00 bh x 56.00 bh = 1,538.88 m1
1,538.88 m1 x 1.579 kg/m = 2,429.89 kg
Æ 8 mm Berat = 0.395 kg/m
0.32 m x 4.00 = 1.28 m
0.05 m x 2.00 = 0.10 m
= 1.38 m x 6.00 bh x 56.00 bh = 463.68 m1
463.68 m1 x 0.395 kg/m = 183.15 kg

2,429.89 kg + 183.154 kg = 2,613.05 kg

Bekisting 17.02 m2
0.40 m x 0.95 m x 4.00 bh x 56.00 bh = 85.12 m2
85.12 m2 x 0.20 (5 kali pakai) = 17.02 m2

7 Urugan Tanah Kembali 212.80 m3 x 0.60 (60% dari galian tanah pondasi) = 127.68 m3 127.68 m3

8 Urugan Pasir di bawah lantai 387.20 m3


tebal urugan 10 cm 20.00 m x 3.00 m x 1.00 = 60.00 m2
2.50 m x 6.80 m x 2.00 = 34.00 m2
= 94.00 m2 x 1.00 m = 94.00 m3
tebal urugan 50 cm 20.00 m x 9.30 m x 1.00 = 186.00 m2
14.00 m x 6.80 m x 1.00 = 95.20 m2
6.00 m x 2.00 m x 1.00 = 12.00 m2
= 293.20 m2 x 1.00 m = 293.20 m3
94.00 m3 + 293.20 m3 = 387.20 m3

9 Cor Lantai Dasar Beton Tulangan Praktis


Beton K-225 47.25 m3
20.00 m x 23.00 m = 460.00 m2
6.25 m x 2.00 m = 12.50 m2
= 472.50 m2 x 0.10 m = 47.25 m3

Tulangan 1,399.07 kg
Wiremesh M6 Berat = 2.961 kg/m2
472.50 m2 x 1.000 lps x 2.961 kg/m (1 lapis wiremesh M6) = 1,399.07 kg

Bekisting 4.50 m2
20.00 m x 0.10 m x 2.00 = 4.00 m2
2.00 m x 0.10 m x 2.00 = 0.40 m2
23.00 m x 0.10 m x 2.00 = 4.60 m2
= 9.00 m2
9.00 m2 x 0.50 (2 kali pakai) = 4.50 m2

II. PEKERJAAN STRUKTUR BETON BERTULANG


1 Balok Sloof Beton Bertulang
Balok Sloof SF1 dan SF 2 (250 mm x 600 mm)
Beton K-225 27.90 m3
20.00 m x 7.00 = 140.00 m1
23.00 m x 2.00 = 46.00 m1
= 186.00 m1 x 0.25 m x 0.60 m = 27.90 m3

Tulangan 4,025.16 kg
D 19 mm Berat = 2.227 kg/m
21.26 m x 8.00 x 7.00 = 1,190.56 m1
23.50 m x 4.00 x 2.00 = 188.00 m1
= 1,378.56 m1
1,378.56 m1 x 2.227 kg/m = 3,070.05 kg
Æ 8 mm Berat = 0.395 kg/m
0.54 m x 2.00 = 1.08 m
0.19 m x 2.00 = 0.38 m
0.05 m x 2.00 = 0.10 m
= 1.56 m x 1,550.00 bh = 2,418.00 m1
2,418.00 m1 x 0.395 kg/m = 955.11 kg

3,070.05 kg + 955.110 kg = 4,025.16 kg


Bekisting 53.94 m2
0.60 m x 186.00 m x 2.00 = 223.20 m2
0.25 m x 186.00 m x 1.00 = 46.50 m2
= 269.70 m2
269.70 m2 x 0.20 (5 kali pakai) = 53.94 m2

Balok Sloof SF3 (150 mm x 600 mm)


Beton K-225 5.67 m3
20.00 m x 2.00 = 40.00 m1
23.00 m x 1.00 = 23.00 m1
= 63.00 m1 x 0.15 m x 0.60 m = 5.67 m3

Tulangan 1,471.78 kg
D 19 mm Berat = 2.227 kg/m
21.26 m x 8.00 x 2.00 = 340.16 m1
24.26 m x 8.00 x 1.00 = 194.08 m1
= 534.24 m1
534.24 m1 x 2.227 kg/m = 1,189.75 kg
Æ 8 mm Berat = 0.395 kg/m
0.54 m x 2.00 = 1.08 m
0.09 m x 2.00 = 0.18 m
0.05 m x 2.00 = 0.10 m
= 1.36 m x 525.00 bh = 714.00 m1
714.00 m1 x 0.395 kg/m = 282.03 kg

1,189.75 kg + 282.030 kg = 1,471.78 kg

Bekisting 17.01 m2
0.60 m x 63.00 m x 2.00 = 75.60 m2
0.15 m x 63.00 m x 1.00 = 9.45 m2
= 85.05 m2
85.05 m2 x 0.20 (5 kali pakai) = 17.01 m2

2 Kolom Beton Bertulang Lantai 1


Kolom K1 (400 mm x 400 mm)
Beton K-225 24.13 m3
0.40 m x 0.40 m x 2.60 m x 58.00 bh = 24.13 m3

Tulangan 4,129.33 kg
D 16 mm Berat = 1.579 kg/m
3.24 m x 12.00 bh x 58.00 bh = 2,255.04 m1
2,255.04 m1 x 1.579 kg/m = 3,560.71 kg
Æ 8 mm Berat = 0.395 kg/m
0.34 m x 4.00 = 1.36 m
0.05 m x 2.00 = 0.10 m
= 1.46 m x 17.00 bh x 58.00 bh = 1,439.56 m1
1,439.56 m1 x 0.395 kg/m = 568.63 kg

3,560.71 kg + 568.626 kg = 4,129.33 kg

Bekisting 48.26 m2
0.40 m x 2.60 m x 4.00 bh x 58.00 bh = 241.28 m2
241.28 m2 x 0.20 (5 kali pakai) = 48.26 m2
2.2.1. HARGA SATUAN PEKERJAAN PERSIAPAN

2.2.1.2. Pembuatan 1 m² pagar sementara dari seng gelombang tinggi 2 meter


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.200 105,000.00 21,000.00
2 Tukang Kayu L.02 OH 0.400 125,000.00 50,000.00
3 Kepala Tukang L.03 OH 0.020 145,000.00 2,900.00
4 Mandor L.04 OH 0.020 155,000.00 3,100.00
JUMLAH TENAGA KERJA 77,000.00
B BAHAN
1 Dolken kayu ф 8-10/400cm batang 1.250 12,000.00 15,000.00
2 Semen Portland kg 2.500 1,500.00 3,750.00
3 Seng Gelombang lbr 1.200 55,000.00 66,000.00
4 Pasir Beton m³ 0.005 125,000.00 625.00
5 Koral Beton m³ 0.009 475,000.00 4,275.00
6 Kayu 5/7 m³ 0.072 4,755,000.00 342,360.00
7 Paku Biasa 2''-5'' kg 0.060 23,000.00 1,380.00
8 Meni Besi liter 0.450 52,000.00 23,400.00
JUMLAH HARGA BAHAN 456,790.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 533,790.00


E Overhead & Profit 15% x D 80,068.50
F Harga Satuan Pekerjaan (D+E) 613,858.50

2.2.1.2.a. Pembuatan 1 m² pagar sementara dari seng gelombang tinggi 2 meter tanpa beton
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.200 105,000.00 21,000.00
2 Tukang Kayu L.02 OH 0.400 125,000.00 50,000.00
3 Kepala Tukang L.03 OH 0.020 145,000.00 2,900.00
4 Mandor L.04 OH 0.020 155,000.00 3,100.00
JUMLAH TENAGA KERJA 77,000.00
B BAHAN
1 Dolken kayu ф 8-10/400cm batang 1.250 12,000.00 15,000.00
2 Seng Gelombang lbr 1.200 55,000.00 66,000.00
3 Kayu 5/7 m³ 0.072 4,755,000.00 342,360.00
4 Paku Biasa 2''-5'' kg 0.060 23,000.00 1,380.00
JUMLAH HARGA BAHAN 424,740.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 501,740.00


E Overhead & Profit 15% x D 75,261.00
F Harga Satuan Pekerjaan (D+E) 577,001.00

2.2.1.4.a. Pengukuran dan Pemasangan 1m Bouplank


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.100 105,000.00 10,500.00
2 Tukang Kayu L.02 OH 0.100 125,000.00 12,500.00
3 Kepala Tukang L.03 OH 0.010 145,000.00 1,450.00
4 Mandor L.04 OH 0.005 155,000.00 775.00
JUMLAH TENAGA KERJA 25,225.00
B BAHAN
1 Kayu Pancang (Dolken) d = 6-8 cm, p = 4m btg 1.000 9,000.00 9,000.00
2 Paku kg 0.020 23,000.00 460.00
3 Papan Kayu Kelas III m3 0.007 2,558,000.00 17,906.00
JUMLAH HARGA BAHAN 27,366.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 52,591.00


E Overhead & Profit 15% x D 7,888.65
F Harga Satuan Pekerjaan (D+E) 60,479.65

2.2.1.5. Pembuatan 1 m² kantor sementara lantai plesteran


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 2.000 105,000.00 210,000.00
2 Tukang Kayu L.02 OH 2.000 125,000.00 250,000.00
3 Tukang Batu L.02 OH 1.000 125,000.00 125,000.00
4 Kepala Tukang L.03 OH 0.300 145,000.00 43,500.00
5 Mandor L.04 OH 0.050 155,000.00 7,750.00
JUMLAH TENAGA KERJA 636,250.00
B BAHAN
1 Dolken kayu ф 8-10/400cm batang 1.250 12,000.00 15,000.00
2 Kayu m³ 0.180 7,500,000.00 1,350,000.00
3 Paku Biasa kg 0.080 23,000.00 1,840.00
4 Besi Strip kg 1.100 15,000.00 16,500.00
5 Semen Portland kg 35.000 1,500.00 52,500.00
6 Pasir Pasang m³ 0.150 125,000.00 18,750.00
7 Koral Beton m³ 0.150 475,000.00 71,250.00
8 Bata Merah bh 30.000 2,000.00 60,000.00
9 Seng Plat lbr 0.250 65,000.00 16,250.00
10 Jendela Naco bh 0.200 400,000.00 80,000.00
11 Kaca Polos m² 0.080 200,000.00 16,000.00
12 Kunci Tanam bh 0.150 55,000.00 8,250.00
13 Plywood 6mm lbr 0.060 111,000.00 6,660.00
JUMLAH HARGA ALAT 1,713,000.00
C PERALATAN

JUMLAH HARGA BAHAN

D Jumlah (A+B+C) 2,349,250.00


E Overhead & Profit 15% x D 352,387.50
F Harga Satuan Pekerjaan (D+E) 2,701,637.50

2.2.1.6. Pembuatan 1 m² rumah jaga (konstruksi kayu)


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang Kayu L.02 OH 1.500 125,000.00 187,500.00
3 Kepala Tukang L.03 OH 0.150 145,000.00 21,750.00
4 Mandor L.04 OH 0.050 155,000.00 7,750.00
JUMLAH TENAGA KERJA 322,000.00
B BAHAN
1 Dolken kayu ф 8-10/400cm batang 3.000 12,000.00 36,000.00
2 Kayu m³ 0.276 7,500,000.00 2,070,000.00
3 Paku Biasa kg 0.700 23,000.00 16,100.00
4 Seng Gelombang kg 1.500 55,000.00 82,500.00
JUMLAH HARGA BAHAN 2,204,600.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 2,526,600.00


E Overhead & Profit 15% x D 378,990.00
F Harga Satuan Pekerjaan (D+E) 2,905,590.00

2.2.1.7. Pembuatan 1 m² gudang semen dan peralatan


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang Kayu L.02 OH 2.000 125,000.00 250,000.00
3 Kepala Tukang L.03 OH 0.200 145,000.00 29,000.00
4 Mandor L.04 OH 0.050 155,000.00 7,750.00
JUMLAH TENAGA KERJA 391,750.00
B BAHAN
1 Dolken kayu ф 8-10/400cm batang 1.700 12,000.00 20,400.00
2 Kayu m³ 0.210 7,500,000.00 1,575,000.00
3 Paku Biasa kg 0.300 23,000.00 6,900.00
4 Semen Portland kg 10.500 1,500.00 15,750.00
5 Pasir Beton m³ 0.030 125,000.00 3,750.00
6 Koral Beton m³ 0.050 475,000.00 23,750.00
7 Seng Gelombang lbr 1.500 55,000.00 82,500.00
8 Seng Plat lbr 0.250 65,000.00 16,250.00
JUMLAH HARGA BAHAN 1,744,300.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 2,136,050.00


E Overhead & Profit 15% x D 320,407.50
F Harga Satuan Pekerjaan (D+E) 2,456,457.50

2.2.1.9. Pembersihan 1m² lapangan dan perataan


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.100 105,000.00 10,500.00
2 Mandor L.02 OH 0.050 155,000.00 7,750.00
JUMLAH TENAGA KERJA 18,250.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 18,250.00


E Overhead & Profit 15% x D 2,737.50
F Harga Satuan Pekerjaan (D+E) 20,987.50

2.2.1.12. Pembuatan 1 m² jalan sementara


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Mandor L.04 OH 0.005 155,000.00 775.00
JUMLAH TENAGA KERJA 105,775.00
B BAHAN
1 Batu Belah m³ 0.150 350,000.00 52,500.00
2 Batu Pecah m³ 0.090 475,000.00 42,750.00
3 Pasir Pasang m³ 0.010 125,000.00 1,250.00
JUMLAH HARGA BAHAN 96,500.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 202,275.00


E Overhead & Profit 15% x D 30,341.25
F Harga Satuan Pekerjaan (D+E) 232,616.25

2.2.1.13. Pembongkaran 1 m³ beton bertulang


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 13.334 105,000.00 1,400,070.00
2 Mandor L.04 OH 0.666 155,000.00 103,230.00
JUMLAH TENAGA KERJA 1,503,300.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,503,300.00


E Overhead & Profit 15% x D 225,495.00
F Harga Satuan Pekerjaan (D+E) 1,728,795.00

2.2.1.14. Pembongkaran 1 m³ dinding tembok bata


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 6.667 105,000.00 700,035.00
2 Mandor L.04 OH 0.333 155,000.00 51,615.00
JUMLAH TENAGA KERJA 751,650.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 751,650.00


E Overhead & Profit 15% x D 112,747.50
F Harga Satuan Pekerjaan (D+E) 864,397.50
2.3.1. HARGA SATUAN PEKERJAAN TANAH

2.3.1.1. Penggalian 1 m³ tanah biasa sedalam 1m


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.750 105,000.00 78,750.00
2 Mandor L.04 OH 0.025 155,000.00 3,875.00
JUMLAH TENAGA KERJA 82,625.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 82,625.00


E Overhead & Profit 15% x D 12,393.75
F Harga Satuan Pekerjaan (D+E) 95,018.75

2.3.1.2. Penggalian 1 m³ tanah biasa sedalam 2 m


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.900 105,000.00 94,500.00
2 Mandor L.04 OH 0.045 155,000.00 6,975.00
JUMLAH TENAGA KERJA 101,475.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 101,475.00


E Overhead & Profit 15% x D 15,221.25
F Harga Satuan Pekerjaan (D+E) 116,696.25

2.3.1.3. Penggalian 1 m³ tanah biasa sedalam3 m


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.050 105,000.00 110,250.00
2 Mandor L.04 OH 0.067 155,000.00 10,385.00
JUMLAH TENAGA KERJA 120,635.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 120,635.00


E Overhead & Profit 15% x D 18,095.25
F Harga Satuan Pekerjaan (D+E) 138,730.25

2.3.1.4. Penggalian 1 m³ tanah keras sedalam 1 m


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Mandor L.04 OH 0.032 155,000.00 4,960.00
JUMLAH TENAGA KERJA 109,960.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 109,960.00
E Overhead & Profit 15% x D 16,494.00
F Harga Satuan Pekerjaan (D+E) 126,454.00

2.3.1.5. Penggalian 1 m³ tanah cadas sedalam 1 m


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.500 105,000.00 157,500.00
2 Mandor L.04 OH 0.060 155,000.00 9,300.00
JUMLAH TENAGA KERJA 166,800.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 166,800.00


E Overhead & Profit 15% x D 25,020.00
F Harga Satuan Pekerjaan (D+E) 191,820.00

2.3.1.6. Penggalian 1 m³ tanah lumpur sedalam 1 m


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.200 105,000.00 126,000.00
2 Mandor L.04 OH 0.045 155,000.00 6,975.00
JUMLAH TENAGA KERJA 132,975.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 132,975.00


E Overhead & Profit 15% x D 19,946.25
F Harga Satuan Pekerjaan (D+E) 152,921.25

2.3.1.7. Pengerjaan stripping 1 m² tanah tebing setinggi 1 m


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.050 105,000.00 5,250.00
2 Mandor L.04 OH 0.005 155,000.00 775.00
JUMLAH TENAGA KERJA 6,025.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 6,025.00


E Overhead & Profit 15% x D 903.75
F Harga Satuan Pekerjaan (D+E) 6,928.75

2.3.1.8. Pembuangan 1 m³ tanah sejauh 30 m


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.330 105,000.00 34,650.00
2 Mandor L.04 OH 0.010 155,000.00 1,550.00
JUMLAH TENAGA KERJA 36,200.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 36,200.00


E Overhead & Profit 15% x D 5,430.00
F Harga Satuan Pekerjaan (D+E) 41,630.00

2.3.1.9. Pengurugan kembali 1 m³ galian tanah (tanah cadas)


Pengurugan kembali 1 m³ galian dihitung dari 1/3 kali dari koefisien pekerjaan galiaan
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.500 105,000.00 52,500.00
2 Mandor L.04 OH 0.050 155,000.00 7,750.00
JUMLAH TENAGA KERJA 60,250.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 60,250.00


E Overhead & Profit 15% x D 9,037.50
F Harga Satuan Pekerjaan (D+E) 69,287.50

2.3.1.9.a. Pengurugan kembali 1 m³ galian tanah biasa


Pengurugan kembali 1 m³ galian dihitung dari 1/3 kali dari koefisien pekerjaan galiaan

HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.250 105,000.00 26,250.00
2 Mandor L.04 OH 0.008 155,000.00 1,291.67
JUMLAH TENAGA KERJA 27,541.67
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 27,541.67


E Overhead & Profit 15% x D 4,131.25
F Harga Satuan Pekerjaan (D+E) 31,672.92

2.3.1.10. Pemadatan tanah 1 m³ tanah (per 20 cm)


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.500 105,000.00 52,500.00
2 Mandor L.04 OH 0.050 155,000.00 7,750.00
JUMLAH TENAGA KERJA 60,250.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 60,250.00


E Overhead & Profit 15% x D 9,037.50
F Harga Satuan Pekerjaan (D+E) 69,287.50

2.3.1.11. Pengurugan 1 m³ dengan pasir urug


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.300 105,000.00 31,500.00
2 Mandor L.04 OH 0.010 155,000.00 1,550.00
JUMLAH TENAGA KERJA 33,050.00
B BAHAN
1 Pasir Urug m3 1.200 125,000.00 150,000.00
JUMLAH HARGA BAHAN 150,000.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 183,050.00


E Overhead & Profit 15% x D 27,457.50
F Harga Satuan Pekerjaan (D+E) 210,507.50

2.3.1.11.a. Pengurugan 1 m³ dengan tanah pilihan


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.300 105,000.00 31,500.00
2 Mandor L.04 OH 0.010 155,000.00 1,550.00
JUMLAH TENAGA KERJA 33,050.00
B BAHAN
1 Tanah pilihan (peladis/bukit tokok) m3 1.200 284,000.00 340,800.00
JUMLAH HARGA BAHAN 340,800.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 373,850.00


E Overhead & Profit 15% x D 56,077.50
F Harga Satuan Pekerjaan (D+E) 429,927.50

2.3.1.11.b. Pengurugan 1 m³ dengan tanah ex. peniraman


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.300 105,000.00 31,500.00
2 Mandor L.04 OH 0.010 155,000.00 1,550.00
JUMLAH TENAGA KERJA 33,050.00
B BAHAN
1 Tanah ex. peniraman m3 1.200 190,000.00 228,000.00
JUMLAH HARGA BAHAN 228,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 261,050.00


E Overhead & Profit 15% x D 39,157.50
F Harga Satuan Pekerjaan (D+E) 300,207.50
3.2.1. HARGA SATUAN PEKERJAAN PONDASI

3.2.1.1. Pemasangan 1 m³ pondasi batu belah campuran 1SP:3PP


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.500 105,000.00 157,500.00
2 Tukang L.02 OH 0.750 125,000.00 93,750.00
3 Kepala Tukang L.03 OH 0.075 145,000.00 10,875.00
4 Mandor L.04 OH 0.075 155,000.00 11,625.00
JUMLAH TENAGA KERJA 273,750.00
B BAHAN
1 Batu Belah m³ 1.200 335,000.00 402,000.00
2 Semen Portland Kg 202.000 1,500.00 303,000.00
3 Pasir Pasang m³ 0.485 125,000.00 60,625.00
JUMLAH HARGA BAHAN 765,625.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,039,375.00


E Overhead & Profit 15% x D 155,906.25
F Harga Satuan Pekerjaan (D+E) 1,195,281.25

3.2.1.2. Pemasangan 1 m³ pondasi batu belah campuran 1SP:4PP


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.500 105,000.00 157,500.00
2 Tukang L.02 OH 0.750 125,000.00 93,750.00
3 Kepala Tukang L.03 OH 0.075 145,000.00 10,875.00
4 Mandor L.04 OH 0.075 155,000.00 11,625.00
JUMLAH TENAGA KERJA 273,750.00
B BAHAN
1 Batu Belah m³ 1.200 335,000.00 402,000.00
2 Semen Portland Kg 163.000 1,500.00 244,500.00
3 Pasir Pasang m³ 0.520 125,000.00 65,000.00
JUMLAH HARGA BAHAN 711,500.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 985,250.00


E Overhead & Profit 15% x D 147,787.50
F Harga Satuan Pekerjaan (D+E) 1,133,037.50

3.2.1.9. Pemasangan 1 m³ batu kosong (anstamping)


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.780 105,000.00 81,900.00
2 Tukang L.02 OH 0.390 125,000.00 48,750.00
3 Kepala Tukang L.03 OH 0.039 145,000.00 5,655.00
4 Mandor L.04 OH 0.039 155,000.00 6,045.00
JUMLAH TENAGA KERJA 142,350.00
B BAHAN
1 Batu Belah m³ 1.200 335,000.00 402,000.00
2 Pasir Urug m³ 0.432 125,000.00 54,000.00
JUMLAH HARGA BAHAN 456,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 598,350.00


E Overhead & Profit 15% x D 89,752.50
F Harga Satuan Pekerjaan (D+E) 688,102.50

3.2.1.10. Pemasangan 1 m³ pondasi siklop, 60% beton campuran 1SP:2PB:3Kr dan 40% batu belah
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 3.400 105,000.00 357,000.00
2 Tukang L.02 OH 0.850 125,000.00 106,250.00
3 Kepala Tukang L.03 OH 0.085 145,000.00 12,325.00
4 Mandor L.04 OH 0.170 155,000.00 26,350.00
JUMLAH TENAGA KERJA 501,925.00
B BAHAN
1 Batu Belah m³ 0.480 335,000.00 160,800.00
2 Semen Portlan Kg 194.000 1,500.00 291,000.00
3 Pasir Beton m³ 0.312 125,000.00 39,000.00
4 Kerikil m³ 0.468 500,000.00 234,000.00
5 Besi Beton Kg 126.000 13,500.00 1,701,000.00
6 Kawat Beton Kg 1.800 25,000.00 45,000.00
JUMLAH HARGA BAHAN 2,470,800.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 2,972,725.00


E Overhead & Profit 15% x D 445,908.75
F Harga Satuan Pekerjaan (D+E) 3,418,633.75
4.1.1. HARGA SATUAN PEKERJAAN BETON

4.1.1.1. Membuat 1 m³ beton mutu f'c =7,4 Mpa ( K 100), slump (12 ± 2) cm ,w/c =0,87
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.650 105,000.00 173,250.00
2 Tukang L.02 OH 0.275 125,000.00 34,375.00
3 Kepala Tukang L.03 OH 0.028 145,000.00 4,060.00
4 Mandor L.04 OH 0.083 155,000.00 12,865.00
JUMLAH TENAGA KERJA 224,550.00
B BAHAN
1 Semen Portlan Kg 247.000 1,500.00 370,500.00
2 Pasir Beton Kg 869.000 89.29 77,589.29
3 Kerikil (Maks 30mm) Kg 999.000 351.85 351,500.00
4 Air Liter - - -
JUMLAH HARGA BAHAN 799,589.29
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,024,139.29


E Overhead & Profit 15% x D 153,620.89
F Harga Satuan Pekerjaan (D+E) 1,177,760.18

4.1.1.1.a. Membuat 1 m³ beton mutu f'c =7,4 Mpa ( K 100), slump (12 ± 2) cm ,w/c =0,87 (Menggunakan Molen)
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.323 105,000.00 138,915.00
2 Tukang L.02 OH 0.189 125,000.00 23,625.00
3 Kepala Tukang L.03 OH 0.019 145,000.00 2,755.00
4 Mandor L.04 OH 0.066 155,000.00 10,230.00
JUMLAH TENAGA KERJA 175,525.00
B BAHAN
1 Semen Portlan Kg 247.000 1,500.00 370,500.00
2 Pasir Beton Kg 869.000 89.29 77,589.29
3 Kerikil (Maks 30mm) Kg 999.000 351.85 351,500.00
4 Air Liter - - -
JUMLAH HARGA BAHAN 799,589.29
C PERALATAN
Sewa Molen Sewa-hari 0.250 170,000.00 42,500.00
JUMLAH HARGA ALAT 42,500.00

D Jumlah (A+B+C) 1,017,614.29


E Overhead & Profit 15% x D 152,642.14
F Harga Satuan Pekerjaan (D+E) 1,170,256.43

CATATAN
bobot pasir =1.400 Kg/m³, Bobot isi kerikil = 1.350 Kg/m³, Buckling factor pasir =20%

4.1.1.2. Membuat 1 m³ beton mutu f'c =9,8 Mpa ( K 125), slump (12 ± 2) cm ,w/c =0,78
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.650 105,000.00 173,250.00
2 Tukang L.02 OH 0.275 125,000.00 34,375.00
3 Kepala Tukang L.03 OH 0.028 145,000.00 4,060.00
4 Mandor L.04 OH 0.083 155,000.00 12,865.00
JUMLAH TENAGA KERJA 224,550.00
B BAHAN
1 Semen Portlan Kg 276.000 1,500.00 414,000.00
2 Pasir Beton Kg 828.000 89.29 73,928.57
3 Kerikil (Maks 30mm) Kg 1,012.000 351.85 356,074.07
4 Air Liter - - -
JUMLAH HARGA BAHAN 844,002.65
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,068,552.65


E Overhead & Profit 15% x D 160,282.90
F Harga Satuan Pekerjaan (D+E) 1,228,835.54
4.1.1.2.a. Membuat 1 m³ beton mutu f'c =9,8 Mpa ( K 125), slump (12 ± 2) cm ,w/c =0,78 (Menggunakan Molen)
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.323 105,000.00 138,915.00
2 Tukang L.02 OH 0.189 125,000.00 23,625.00
3 Kepala Tukang L.03 OH 0.019 145,000.00 2,755.00
4 Mandor L.04 OH 0.066 155,000.00 10,230.00
JUMLAH TENAGA KERJA 175,525.00
B BAHAN
1 Semen Portlan Kg 276.000 1,500.00 414,000.00
2 Pasir Beton Kg 828.000 89.29 73,928.57
3 Kerikil (Maks 30mm) Kg 1,012.000 351.85 356,074.07
4 Air Liter - - -
JUMLAH HARGA BAHAN 844,002.65
C PERALATAN
1 Sewa Molen Sewa-hari 0.250 170,000.00 42,500.00
JUMLAH HARGA ALAT 42,500.00

D Jumlah (A+B+C) 1,062,027.65


E Overhead & Profit 15% x D 159,304.15
F Harga Satuan Pekerjaan (D+E) 1,221,331.79

CATATAN
bobot pasir =1.400 Kg/m³, Bobot isi kerikil = 1.350 Kg/m³, Buckling factor pasir =20%

4.1.1.3. Membuat 1 m³ beton mutu f'c =12,2 Mpa ( K 150), slump (12 ± 2) cm ,w/c =0,72
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.650 105,000.00 173,250.00
2 Tukang L.02 OH 0.275 125,000.00 34,375.00
3 Kepala Tukang L.03 OH 0.028 145,000.00 4,060.00
4 Mandor L.04 OH 0.083 155,000.00 12,865.00
JUMLAH TENAGA KERJA 224,550.00
B BAHAN
1 Semen Portlan Kg 299.000 1,500.00 448,500.00
2 Pasir Beton Kg 799.000 89.29 71,339.29
3 Kerikil (Maks 30mm) Kg 1,017.000 351.85 357,833.33
4 Air Liter - - -
JUMLAH HARGA BAHAN 877,672.62
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,102,222.62


E Overhead & Profit 15% x D 165,333.39
F Harga Satuan Pekerjaan (D+E) 1,267,556.01

4.1.1.3.a. Membuat 1 m³ beton mutu f'c =12,2 Mpa ( K 150), slump (12 ± 2) cm ,w/c =0,72 (Menggunakan Molen)
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.323 105,000.00 138,915.00
2 Tukang L.02 OH 0.189 125,000.00 23,625.00
3 Kepala Tukang L.03 OH 0.019 145,000.00 2,755.00
4 Mandor L.04 OH 0.066 155,000.00 10,230.00
JUMLAH TENAGA KERJA 175,525.00
B BAHAN
1 Semen Portlan Kg 299.000 1,500.00 448,500.00
2 Pasir Beton Kg 799.000 89.29 71,339.29
3 Kerikil (Maks 30mm) Kg 1,017.000 351.85 357,833.33
4 Air Liter - - -
JUMLAH HARGA BAHAN 877,672.62
C PERALATAN
1 Sewa Molen Sewa-hari 0.250 170,000.00 42,500.00
JUMLAH HARGA ALAT 42,500.00

D Jumlah (A+B+C) 1,095,697.62


E Overhead & Profit 15% x D 164,354.64
F Harga Satuan Pekerjaan (D+E) 1,260,052.26

CATATAN
bobot pasir =1.400 Kg/m³, Bobot isi kerikil = 1.350 Kg/m³, Buckling factor pasir =20%
4.1.1.4. Membuat 1 m³ lantai kerja beton mutu f'c =7,4 Mpa ( K 100), slump (3-6) cm ,w/c =0,87
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.200 105,000.00 126,000.00
2 Tukang L.02 OH 0.200 125,000.00 25,000.00
3 Kepala Tukang L.03 OH 0.020 145,000.00 2,900.00
4 Mandor L.04 OH 0.060 155,000.00 9,300.00
JUMLAH TENAGA KERJA 163,200.00
B BAHAN
1 Semen Portlan Kg 230.000 1,500.00 345,000.00
2 Pasir Beton Kg 893.000 89.29 79,732.14
3 Kerikil (Maks 30mm) Kg 1,027.000 351.85 361,351.85
4 Air Liter - - -
JUMLAH HARGA BAHAN 786,083.99
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 949,283.99


E Overhead & Profit 15% x D 142,392.60
F Harga Satuan Pekerjaan (D+E) 1,091,676.59

4.1.1.4.a. Membuat 1 m³ lantai kerja beton mutu f'c =7,4 Mpa ( K 100), slump (3-6) cm ,w/c =0,87 (Menggunakan Molen)
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.960 105,000.00 100,800.00
2 Tukang L.02 OH 0.130 125,000.00 16,250.00
3 Kepala Tukang L.03 OH 0.013 145,000.00 1,885.00
4 Mandor L.04 OH 0.048 155,000.00 7,440.00
JUMLAH TENAGA KERJA 126,375.00
B BAHAN
1 Semen Portlan Kg 230.000 1,500.00 345,000.00
2 Pasir Beton Kg 893.000 89.29 79,732.14
3 Kerikil (Maks 30mm) Kg 1,027.000 351.85 361,351.85
4 Air Liter - - -
JUMLAH HARGA BAHAN 786,083.99
C PERALATAN
1 Sewa Molen Sewa-hari 0.250 170,000.00 42,500.00
JUMLAH HARGA ALAT 42,500.00

D Jumlah (A+B+C) 954,958.99


E Overhead & Profit 15% x D 143,243.85
F Harga Satuan Pekerjaan (D+E) 1,098,202.84

CATATAN
bobot pasir =1.400 Kg/m³, Bobot isi kerikil = 1.350 Kg/m³, Buckling factor pasir =20%

4.1.1.5. Membuat 1 m³ beton mutu f'c =14,5 Mpa ( K 175), slump (12 ± 2) cm ,w/c = 0,66
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.650 105,000.00 173,250.00
2 Tukang L.02 OH 0.275 125,000.00 34,375.00
3 Kepala Tukang L.03 OH 0.028 145,000.00 4,060.00
4 Mandor L.04 OH 0.083 155,000.00 12,865.00
JUMLAH TENAGA KERJA 224,550.00
B BAHAN
1 Semen Portlan Kg 326.000 1,500.00 489,000.00
2 Pasir Beton Kg 760.000 89.29 67,857.14
3 Kerikil (Maks 30mm) Kg 1,029.000 351.85 362,055.56
4 Air Liter - - -
JUMLAH HARGA BAHAN 918,912.70
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,143,462.70


E Overhead & Profit 15% x D 171,519.40
F Harga Satuan Pekerjaan (D+E) 1,314,982.10
4.1.1.5.a. Membuat 1 m³ beton mutu f'c =14,5 Mpa ( K 175), slump (12 ± 2) cm ,w/c = 0,66 (Menggunakan Molen)
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.323 105,000.00 138,915.00
2 Tukang L.02 OH 0.189 125,000.00 23,625.00
3 Kepala Tukang L.03 OH 0.019 145,000.00 2,755.00
4 Mandor L.04 OH 0.066 155,000.00 10,230.00
JUMLAH TENAGA KERJA 175,525.00
B BAHAN
1 Semen Portlan Kg 326.000 1,500.00 489,000.00
2 Pasir Beton Kg 760.000 89.29 67,857.14
3 Kerikil (Maks 30mm) Kg 1,029.000 351.85 362,055.56
4 Air Liter - - -
JUMLAH HARGA BAHAN 918,912.70
C PERALATAN
1 Sewa Molen Sewa-hari 0.250 170,000.00 42,500.00
JUMLAH HARGA ALAT 42,500.00

D Jumlah (A+B+C) 1,136,937.70


E Overhead & Profit 15% x D 170,540.65
F Harga Satuan Pekerjaan (D+E) 1,307,478.35

CATATAN
bobot pasir =1.400 Kg/m³, Bobot isi kerikil = 1.350 Kg/m³, Buckling factor pasir =20%

4.1.1.6. Membuat 1 m³ beton mutu f'c =16,9 Mpa ( K 200), slump (12 ± 2) cm ,w/c = 0,61
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.650 105,000.00 173,250.00
2 Tukang L.02 OH 0.275 125,000.00 34,375.00
3 Kepala Tukang L.03 OH 0.028 145,000.00 4,060.00
4 Mandor L.04 OH 0.083 155,000.00 12,865.00
JUMLAH TENAGA KERJA 224,550.00
B BAHAN
1 Semen Portlan Kg 352.000 1,500.00 528,000.00
2 Pasir Beton Kg 731.000 89.29 65,267.86
3 Kerikil (Maks 30mm) Kg 1,031.000 351.85 362,759.26
4 Air Liter - - -
JUMLAH HARGA BAHAN 956,027.12
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,180,577.12


E Overhead & Profit 15% x D 177,086.57
F Harga Satuan Pekerjaan (D+E) 1,357,663.68

4.1.1.6.a. Membuat 1 m³ beton mutu f'c =16,9 Mpa ( K 200), slump (12 ± 2) cm ,w/c = 0,61 (Menggunakan Molen)
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.323 105,000.00 138,915.00
2 Tukang L.02 OH 0.189 125,000.00 23,625.00
3 Kepala Tukang L.03 OH 0.019 145,000.00 2,755.00
4 Mandor L.04 OH 0.066 155,000.00 10,230.00
JUMLAH TENAGA KERJA 175,525.00
B BAHAN
1 Semen Portlan Kg 352.000 1,500.00 528,000.00
2 Pasir Beton Kg 731.000 89.29 65,267.86
3 Kerikil (Maks 30mm) Kg 1,031.000 351.85 362,759.26
4 Air Liter - - -
JUMLAH HARGA BAHAN 956,027.12
C PERALATAN
1 Sewa Molen Sewa-hari 0.250 170,000.00 42,500.00
JUMLAH HARGA ALAT 42,500.00

D Jumlah (A+B+C) 1,174,052.12


E Overhead & Profit 15% x D 176,107.82
F Harga Satuan Pekerjaan (D+E) 1,350,159.93

CATATAN
bobot pasir =1.400 Kg/m³, Bobot isi kerikil = 1.350 Kg/m³, Buckling factor pasir =20%
4.1.1.7. Membuat 1 m³ beton mutu f'c =19,3 Mpa ( K 225), slump (12 ± 2) cm ,w/c = 0,58
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.650 105,000.00 173,250.00
2 Tukang L.02 OH 0.275 125,000.00 34,375.00
3 Kepala Tukang L.03 OH 0.028 145,000.00 4,060.00
4 Mandor L.04 OH 0.083 155,000.00 12,865.00
JUMLAH TENAGA KERJA 224,550.00
B BAHAN
1 Semen Portlan Kg 371.000 1,500.00 556,500.00
2 Pasir Beton Kg 698.000 89.29 62,321.43
3 Kerikil (Maks 30mm) Kg 1,047.000 351.85 368,388.89
4 Air Liter - - -
JUMLAH HARGA BAHAN 987,210.32
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,211,760.32


E Overhead & Profit 15% x D 181,764.05
F Harga Satuan Pekerjaan (D+E) 1,393,524.37

4.1.1.7.a Membuat 1 m³ beton mutu f'c =19,3 Mpa ( K 225), slump (12 ± 2) cm ,w/c = 0,58 (Menggunakan Molen)
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.323 105,000.00 138,915.00
2 Tukang L.02 OH 0.189 125,000.00 23,625.00
3 Kepala Tukang L.03 OH 0.019 145,000.00 2,755.00
4 Mandor L.04 OH 0.066 155,000.00 10,230.00
JUMLAH TENAGA KERJA 175,525.00
B BAHAN
1 Semen Portlan Kg 371.000 1,500.00 556,500.00
2 Pasir Beton Kg 698.000 89.29 62,321.43
3 Kerikil (Maks 30mm) Kg 1,047.000 351.85 368,388.89
4 Air Liter - - -
JUMLAH HARGA BAHAN 987,210.32
C PERALATAN
1 Sewa Molen Sewa-hari 0.250 165,000.00 41,250.00
JUMLAH HARGA ALAT 41,250.00

D Jumlah (A+B+C) 1,203,985.32


E Overhead & Profit 15% x D 180,597.80
F Harga Satuan Pekerjaan (D+E) 1,384,583.12

CATATAN
bobot pasir =1.400 Kg/m³, Bobot isi kerikil = 1.350 Kg/m³, Buckling factor pasir =20%

4.1.1.8. Membuat 1 m³ beton mutu f'c =21,7 Mpa ( K 250), slump (12 ± 2) cm ,w/c = 0,56
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.650 105,000.00 173,250.00
2 Tukang L.02 OH 0.275 125,000.00 34,375.00
3 Kepala Tukang L.03 OH 0.028 145,000.00 4,060.00
4 Mandor L.04 OH 0.083 155,000.00 12,865.00
JUMLAH TENAGA KERJA 224,550.00
B BAHAN
1 Semen Portlan Kg 384.000 1,500.00 576,000.00
2 Pasir Beton Kg 692.000 89.29 61,785.71
3 Kerikil (Maks 30mm) Kg 1,039.000 351.85 365,574.07
4 Air Liter - - -
JUMLAH HARGA BAHAN 1,003,359.79
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,227,909.79


E Overhead & Profit 15% x D 184,186.47
F Harga Satuan Pekerjaan (D+E) 1,412,096.26

CATATAN
bobot pasir =1.400 Kg/m³, Bobot isi kerikil = 1.350 Kg/m³, Buckling factor pasir =20%
4.1.1.9. Membuat 1 m³ beton mutu f'c =24,0 Mpa ( K 275), slump (12 ± 2) cm ,w/c = 0,53
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.650 105,000.00 173,250.00
2 Tukang L.02 OH 0.275 125,000.00 34,375.00
3 Kepala Tukang L.03 OH 0.028 145,000.00 4,060.00
4 Mandor L.04 OH 0.083 155,000.00 12,865.00
JUMLAH TENAGA KERJA 224,550.00
B BAHAN
1 Semen Portlan Kg 406.000 1,500.00 609,000.00
2 Pasir Beton Kg 684.000 89.29 61,071.43
3 Kerikil (Maks 30mm) Kg 1,026.000 351.85 361,000.00
4 Air Liter - - -
JUMLAH HARGA BAHAN 1,031,071.43
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,255,621.43


E Overhead & Profit 15% x D 188,343.21
F Harga Satuan Pekerjaan (D+E) 1,443,964.64

CATATAN
bobot pasir =1.400 Kg/m³, Bobot isi kerikil = 1.350 Kg/m³, Buckling factor pasir =20%

4.1.1.10. Membuat 1 m³ beton mutu f'c =26,4 Mpa ( K 300), slump (12 ± 2) cm ,w/c = 0,52
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.650 105,000.00 173,250.00
2 Tukang L.02 OH 0.275 125,000.00 34,375.00
3 Kepala Tukang L.03 OH 0.028 145,000.00 4,060.00
4 Mandor L.04 OH 0.083 155,000.00 12,865.00
JUMLAH TENAGA KERJA 224,550.00
B BAHAN
1 Semen Portlan Kg 413.000 1,500.00 619,500.00
2 Pasir Beton Kg 681.000 89.29 60,803.57
3 Kerikil (Maks 30mm) Kg 1,021.000 351.85 359,240.74
4 Air Liter - - -
JUMLAH HARGA BAHAN 1,039,544.31
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,264,094.31


E Overhead & Profit 15% x D 189,614.15
F Harga Satuan Pekerjaan (D+E) 1,453,708.46

CATATAN
bobot pasir =1.400 Kg/m³, Bobot isi kerikil = 1.350 Kg/m³, Buckling factor pasir =20%

4.1.1.11. Membuat 1 m³ beton mutu f'c =28,8 Mpa ( K 325), slump (12 ± 2) cm ,w/c = 0,49
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 2.100 105,000.00 220,500.00
2 Tukang L.02 OH 0.350 125,000.00 43,750.00
3 Kepala Tukang L.03 OH 0.075 145,000.00 10,875.00
4 Mandor L.04 OH 0.105 155,000.00 16,275.00
JUMLAH TENAGA KERJA 291,400.00
B BAHAN
1 Semen Portlan Kg 439.000 1,500.00 658,500.00
2 Pasir Beton Kg 670.000 89.29 59,821.43
3 Kerikil (Maks 30mm) Kg 1,006.000 351.85 353,962.96
4 Air Liter - - -
JUMLAH HARGA BAHAN 1,072,284.39
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,363,684.39


E Overhead & Profit 15% x D 204,552.66
F Harga Satuan Pekerjaan (D+E) 1,568,237.05

CATATAN
bobot pasir =1.400 Kg/m³, Bobot isi kerikil = 1.350 Kg/m³, Buckling factor pasir =20%

4.1.1.12. Membuat 1 m³ beton mutu f'c =31,2 Mpa ( K 350), slump (12 ± 2) cm ,w/c = 0,48
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 2.100 105,000.00 220,500.00
2 Tukang L.02 OH 0.350 125,000.00 43,750.00
3 Kepala Tukang L.03 OH 0.075 145,000.00 10,875.00
4 Mandor L.04 OH 0.105 155,000.00 16,275.00
JUMLAH TENAGA KERJA 291,400.00
B BAHAN
1 Semen Portlan Kg 448.000 1,500.00 672,000.00
2 Pasir Beton Kg 667.000 89.29 59,553.57
3 Kerikil (Maks 30mm) Kg 1,000.000 351.85 351,851.85
4 Air Liter - - -
JUMLAH HARGA BAHAN 1,083,405.42
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,374,805.42
E Overhead & Profit 15% x D 206,220.81
F Harga Satuan Pekerjaan (D+E) 1,581,026.24
CATATAN
bobot pasir =1.400 Kg/m³, Bobot isi kerikil = 1.350 Kg/m³, Buckling factor pasir =20%

4.1.1.14. Pemasangan 1m PVC waterstop lebar 150 mm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.060 105,000.00 6,300.00
2 Tukang L.02 OH 0.030 125,000.00 3,750.00
3 Kepala Tukang L.03 OH 0.003 145,000.00 435.00
4 Mandor L.04 OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 10,950.00
B BAHAN
1 Waterstop lebar 150 mm m 1.050 125,000.00 131,250.00
JUMLAH HARGA BAHAN 131,250.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 142,200.00
E Overhead & Profit 15% x D 21,330.00
F Harga Satuan Pekerjaan (D+E) 163,530.00

4.1.1.15. Pemasangan 1m PVC waterstop lebar 200 mm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.070 105,000.00 7,350.00
2 Tukang L.02 OH 0.035 125,000.00 4,375.00
3 Kepala Tukang L.03 OH 0.004 145,000.00 580.00
4 Mandor L.04 OH 0.007 155,000.00 1,085.00
JUMLAH TENAGA KERJA 13,390.00
B BAHAN
1 Waterstop lebar 200 mm m 1.050 135,000.00 141,750.00
JUMLAH HARGA BAHAN 141,750.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 155,140.00
E Overhead & Profit 15% x D 23,271.00
F Harga Satuan Pekerjaan (D+E) 178,411.00

4.1.1.16. Pemasangan 1m PVC waterstop lebar 230-320 mm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.080 105,000.00 8,400.00
2 Tukang L.02 OH 0.040 125,000.00 5,000.00
3 Kepala Tukang L.03 OH 0.004 145,000.00 580.00
4 Mandor L.04 OH 0.004 155,000.00 620.00
JUMLAH TENAGA KERJA 14,600.00
B BAHAN
1 Waterstop lebar 230 -320 mm m 1.050 150,000.00 157,500.00
JUMLAH HARGA BAHAN 157,500.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 172,100.00
E Overhead & Profit 15% x D 25,815.00
F Harga Satuan Pekerjaan (D+E) 197,915.00

4.1.1.17. Pembesian 10 Kg dengan besi polos atau besi ulir U 32


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.070 105,000.00 7,350.00
2 Tukang L.02 OH 0.070 125,000.00 8,750.00
3 Kepala Tukang L.03 OH 0.007 145,000.00 1,015.00
4 Mandor L.04 OH 0.004 155,000.00 620.00
JUMLAH TENAGA KERJA 17,735.00
B BAHAN
1 Besi Beton (polos/ulir) U 32 Kg 10.500 13,500.00 141,750.00
2 Kawat Beton Kg 0.150 25,000.00 3,750.00
JUMLAH HARGA BAHAN 145,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 163,235.00
E Overhead & Profit 15% x D 24,485.25
F Harga Satuan Pekerjaan (D+E) 187,720.25
G Harga Satuan Pekerjaan (D+E) per 1 kg 18,772.03

4.1.1.17.a. Pembesian 10 Kg dengan besi polos atau besi ulir U 24


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.070 105,000.00 7,350.00
2 Tukang L.02 OH 0.070 125,000.00 8,750.00
3 Kepala Tukang L.03 OH 0.007 145,000.00 1,015.00
4 Mandor L.04 OH 0.004 155,000.00 620.00
JUMLAH TENAGA KERJA 17,735.00
B BAHAN
1 Besi Beton (polos/ulir) U 24 Kg 10.500 13,500.00 141,750.00
2 Kawat Beton Kg 0.150 25,000.00 3,750.00
JUMLAH HARGA BAHAN 145,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 163,235.00
E Overhead & Profit 15% x D 24,485.25
F Harga Satuan Pekerjaan (D+E) 187,720.25
G Harga Satuan Pekerjaan (D+E) per 1 kg 18,772.03

4.1.1.18. Pemasangan 10 Kg kabel presstressed polos/strands


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.050 105,000.00 5,250.00
2 Tukang L.02 OH 0.050 125,000.00 6,250.00
3 Kepala Tukang L.03 OH 0.005 145,000.00 725.00
4 Mandor L.04 OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 12,690.00
B BAHAN
1 Besi Beton (polos/ulir) U32 Kg 10.500 13,500.00 141,750.00
2 Kawat Beton Kg 0.100 25,000.00 2,500.00
JUMLAH HARGA BAHAN 144,250.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 156,940.00
E Overhead & Profit 15% x D 23,541.00
F Harga Satuan Pekerjaan (D+E) 180,481.00
G Harga Satuan Pekerjaan (D+E) per 1 kg 18,048.10

4.1.1.19. Pemasangan 10 Kg jaring kawat baja (wiremesh)


HARGA BIAYA
NO. URAIAN PEKERJAAN SATUAN KOEFISIEN
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.025 105,000.00 2,625.00
2 Tukang L.02 OH 0.025 125,000.00 3,125.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.001 155,000.00 155.00
JUMLAH TENAGA KERJA 9,530.00
B BAHAN
1 Wiremesh m5 Kg 10.200 14,500.00 147,900.00
2 Kawat Beton Kg 0.050 25,000.00 1,250.00
JUMLAH HARGA BAHAN 149,150.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 158,680.00
E Overhead & Profit 15% x D 23,802.00
F Harga Satuan Pekerjaan (D+E) 182,482.00
G Harga Satuan Pekerjaan (D+E) per 1 kg 18,248.20

4.1.1.20. Pemasangan 1m² bekisting untuk pondasi


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.520 105,000.00 54,600.00
2 Tukang L.02 OH 0.260 125,000.00 32,500.00
3 Kepala Tukang L.03 OH 0.026 145,000.00 3,770.00
4 Mandor L.04 OH 0.026 155,000.00 4,030.00
JUMLAH TENAGA KERJA 94,900.00
B BAHAN
1 Ky klas III uk. 3/5 - 4 M ( tdk ketam) m³ 0.040 2,500,000.00 100,000.00
2 Paku 5 - 10 cm Kg 0.300 23,000.00 6,900.00
3 Minyak Bekisting Liter 0.100 8,100.00 810.00
JUMLAH HARGA BAHAN 107,710.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 202,610.00
E Overhead & Profit 15% x D 30,391.50
F Harga Satuan Pekerjaan (D+E) 233,001.50

4.1.1.20.a. Pemasangan 1m² bekisting untuk pondasi (papan mal)


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.520 105,000.00 54,600.00
2 Tukang L.02 OH 0.260 125,000.00 32,500.00
3 Kepala Tukang L.03 OH 0.026 145,000.00 3,770.00
4 Mandor L.04 OH 0.026 155,000.00 4,030.00
JUMLAH TENAGA KERJA 94,900.00
B BAHAN
1 Papan Mal kelas III m³ 0.031 2,558,000.00 79,298.00
2 Paku 5 - 10 cm Kg 0.300 23,000.00 6,900.00
3 Cerucuk ф 6-8 cm - panj 4 m Btg 0.125 9,000.00 1,125.00
JUMLAH HARGA BAHAN 87,323.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 182,223.00


E Overhead & Profit 15% x D 27,333.45
F Harga Satuan Pekerjaan (D+E) 209,556.45

4.1.1.20.b. Pemasangan berulang 1m² bekisting untuk pondasi (papan mal)


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.520 105,000.00 54,600.00
2 Tukang L.02 OH 0.260 125,000.00 32,500.00
3 Kepala Tukang L.03 OH 0.026 145,000.00 3,770.00
4 Mandor L.04 OH 0.026 155,000.00 4,030.00
JUMLAH TENAGA KERJA 94,900.00
B BAHAN
1 Papan Mal kelas III m³ 0.031 2,558,000.00 79,298.00
2 Paku 5 - 10 cm Kg 0.300 23,000.00 6,900.00
3 Cerucuk ф 6-8 cm - panj 4 m Btg 0.125 9,000.00 1,125.00
JUMLAH HARGA BAHAN 87,323.00
JUMLAH HARGA BAHAN x 55 % 48,027.65
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 142,927.65


E Overhead & Profit 15% x D 21,439.15
F Harga Satuan Pekerjaan (D+E) 164,366.80

4.1.1.21. Pemasangan 1m² bekisting untuk sloof


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.520 105,000.00 54,600.00
2 Tukang L.02 OH 0.260 125,000.00 32,500.00
3 Kepala Tukang L.03 OH 0.026 145,000.00 3,770.00
4 Mandor L.04 OH 0.026 155,000.00 4,030.00
JUMLAH TENAGA KERJA 94,900.00
B BAHAN
1 Kayu kelas III m³ 0.045 2,500,000.00 112,500.00
2 Paku 5 - 10 cm Kg 0.300 23,000.00 6,900.00
3 Minyak Bekisting Liter 0.100 8,100.00 810.00
JUMLAH HARGA BAHAN 120,210.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 215,110.00


E Overhead & Profit 15% x D 32,266.50
F Harga Satuan Pekerjaan (D+E) 247,376.50

4.1.1.22. Pemasangan 1m² bekisting untuk kolom


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.660 105,000.00 69,300.00
2 Tukang L.02 OH 0.330 125,000.00 41,250.00
3 Kepala Tukang L.03 OH 0.033 145,000.00 4,785.00
4 Mandor L.04 OH 0.033 155,000.00 5,115.00
JUMLAH TENAGA KERJA 120,450.00
B BAHAN
1 Kayu kelas III m³ 0.040 2,500,000.00 100,000.00
2 Paku 5 - 12 cm Kg 0.400 23,000.00 9,200.00
3 Minyak Bekisting Liter 0.200 8,100.00 1,620.00
4 Balok kayu kelas II m³ 0.015 3,355,000.00 50,325.00
5 Plywood tebal 9mm Lbr 0.350 220,000.00 77,000.00
6 Dolken kayu ф 8-10 cm - panj 4 m Batang 2.000 12,000.00 24,000.00
JUMLAH HARGA BAHAN 262,145.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 382,595.00


E Overhead & Profit 15% x D 57,389.25
F Harga Satuan Pekerjaan (D+E) 439,984.25

4.1.1.22.a. Pemasangan 1m² bekisting untuk kolom (papan mal)


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.660 105,000.00 69,300.00
2 Tukang L.02 OH 0.330 125,000.00 41,250.00
3 Kepala Tukang L.03 OH 0.033 145,000.00 4,785.00
4 Mandor L.04 OH 0.033 155,000.00 5,115.00
JUMLAH TENAGA KERJA 120,450.00
B BAHAN
1 Kayu kelas III m³ 0.040 2,500,000.00 100,000.00
2 Paku 5 - 12 cm Kg 0.400 23,000.00 9,200.00
3 Minyak Bekisting Liter - 8,100.00 -
4 Balok kayu kelas II m³ 0.015 3,355,000.00 50,325.00
5 Papan Mal kelas III m³ 0.022 2,558,000.00 56,276.00
6 Dolken kayu ф 8-10 cm - panj 4 m Batang 2.000 12,000.00 24,000.00
JUMLAH HARGA BAHAN 239,801.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 360,251.00


E Overhead & Profit 15% x D 54,037.65
F Harga Satuan Pekerjaan (D+E) 414,288.65

4.1.1.22.b. Pemasangan berulang 1m² bekisting untuk kolom (papan mal)


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.660 105,000.00 69,300.00
2 Tukang L.02 OH 0.330 125,000.00 41,250.00
3 Kepala Tukang L.03 OH 0.033 145,000.00 4,785.00
4 Mandor L.04 OH 0.033 155,000.00 5,115.00
JUMLAH TENAGA KERJA 120,450.00
B BAHAN
1 Kayu kelas III m³ 0.040 2,500,000.00 100,000.00
2 Paku 5 - 12 cm Kg 0.400 23,000.00 9,200.00
3 Minyak Bekisting Liter - 8,100.00 -
4 Balok kayu kelas II m³ 0.015 3,355,000.00 50,325.00
5 Papan Mal kelas III m³ 0.022 2,558,000.00 56,276.00
6 Dolken kayu ф 8-10 cm - panj 4 m Batang 2.000 12,000.00 24,000.00
JUMLAH HARGA BAHAN 239,801.00
JUMLAH HARGA BAHAN x 55 % 131,890.55
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 252,340.55


E Overhead & Profit 15% x D 37,851.08
F Harga Satuan Pekerjaan (D+E) 290,191.63

4.1.1.23. Pemasangan 1m² bekisting untuk balok


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.660 105,000.00 69,300.00
2 Tukang L.02 OH 0.330 125,000.00 41,250.00
3 Kepala Tukang L.03 OH 0.033 145,000.00 4,785.00
4 Mandor L.04 OH 0.033 155,000.00 5,115.00
JUMLAH TENAGA KERJA 120,450.00
B BAHAN
1 Kayu kelas III m³ 0.040 2,500,000.00 100,000.00
2 Paku 5 - 12 cm Kg 0.400 23,000.00 9,200.00
3 Minyak Bekisting Liter 0.200 8,100.00 1,620.00
4 Balok kayu kelas II m³ 0.018 3,355,000.00 60,390.00
5 Plywood tebal 9mm Lbr 0.350 220,000.00 77,000.00
6 Dolken kayu ф 8-10 cm - panj 4 m Batang 2.000 12,000.00 24,000.00
JUMLAH HARGA BAHAN 272,210.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 392,660.00


E Overhead & Profit 15% x D 58,899.00
F Harga Satuan Pekerjaan (D+E) 451,559.00

4.1.1.23.a. Pemasangan 1m² bekisting untuk balok (papan mal)


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.660 105,000.00 69,300.00
2 Tukang L.02 OH 0.330 125,000.00 41,250.00
3 Kepala Tukang L.03 OH 0.033 145,000.00 4,785.00
4 Mandor L.04 OH 0.033 155,000.00 5,115.00
JUMLAH TENAGA KERJA 120,450.00
B BAHAN
1 Kayu kelas III m³ 0.040 2,500,000.00 100,000.00
2 Paku 5 - 12 cm Kg 0.400 23,000.00 9,200.00
3 Minyak Bekisting Liter - 8,100.00 -
4 Balok kayu kelas II m³ 0.018 3,355,000.00 60,390.00
5 Papan Mal kelas III m³ 0.022 2,558,000.00 56,276.00
6 Dolken kayu ф 8-10 cm - panj 4 m Batang 2.000 12,000.00 24,000.00
JUMLAH HARGA BAHAN 249,866.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 370,316.00


E Overhead & Profit 15% x D 55,547.40
F Harga Satuan Pekerjaan (D+E) 425,863.40

4.1.1.23.b. Pemasangan berulang 1m² bekisting untuk balok (papan mal)


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.660 105,000.00 69,300.00
2 Tukang L.02 OH 0.330 125,000.00 41,250.00
3 Kepala Tukang L.03 OH 0.033 145,000.00 4,785.00
4 Mandor L.04 OH 0.033 155,000.00 5,115.00
JUMLAH TENAGA KERJA 120,450.00
B BAHAN
1 Kayu kelas III m³ 0.040 2,500,000.00 100,000.00
2 Paku 5 - 12 cm Kg 0.400 23,000.00 9,200.00
3 Minyak Bekisting Liter - 8,100.00 -
4 Balok kayu kelas II m³ 0.018 3,355,000.00 60,390.00
5 Papan Mal kelas III m³ 0.022 2,558,000.00 56,276.00
6 Dolken kayu ф 8-10 cm - panj 4 m Batang 2.000 12,000.00 24,000.00
JUMLAH HARGA BAHAN 249,866.00
JUMLAH HARGA BAHAN x 55 % 137,426.30
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 257,876.30


E Overhead & Profit 15% x D 38,681.45
F Harga Satuan Pekerjaan (D+E) 296,557.75

4.1.1.24. Pemasangan 1m² bekisting untuk lantai


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.660 105,000.00 69,300.00
2 Tukang L.02 OH 0.330 125,000.00 41,250.00
3 Kepala Tukang L.03 OH 0.033 145,000.00 4,785.00
4 Mandor L.04 OH 0.033 155,000.00 5,115.00
JUMLAH TENAGA KERJA 120,450.00
B BAHAN
1 Kayu kelas III m³ 0.040 2,500,000.00 100,000.00
2 Paku 5 - 12 cm Kg 0.400 23,000.00 9,200.00
3 Minyak Bekisting Liter 0.200 8,100.00 1,620.00
4 Balok kayu kelas II m³ 0.015 3,355,000.00 50,325.00
5 Plywood tebal 9mm Lbr 0.350 220,000.00 77,000.00
6 Dolken kayu ф 8-10 cm - panj 4 m Batang 6.000 12,000.00 72,000.00
JUMLAH HARGA BAHAN 310,145.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 430,595.00


E Overhead & Profit 15% x D 64,589.25
F Harga Satuan Pekerjaan (D+E) 495,184.25

4.1.1.24.a. Pemasangan 1m² bekisting untuk lantai (papan mal)


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.660 105,000.00 69,300.00
2 Tukang L.02 OH 0.330 125,000.00 41,250.00
3 Kepala Tukang L.03 OH 0.033 145,000.00 4,785.00
4 Mandor L.04 OH 0.033 155,000.00 5,115.00
JUMLAH TENAGA KERJA 120,450.00
B BAHAN
1 Kayu kelas III m³ 0.040 2,500,000.00 100,000.00
2 Paku 5 - 12 cm Kg 0.400 23,000.00 9,200.00
3 Minyak Bekisting Liter - 8,100.00 -
4 Balok kayu kelas II m³ 0.015 3,355,000.00 50,325.00
5 Papan Mal kelas III m³ 0.022 2,558,000.00 56,276.00
6 Dolken kayu ф 8-10 cm - panj 4 m Batang 6.000 12,000.00 72,000.00
JUMLAH HARGA BAHAN 287,801.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 408,251.00


E Overhead & Profit 15% x D 61,237.65
F Harga Satuan Pekerjaan (D+E) 469,488.65

4.1.1.24.b. Pemasangan berulang 1m² bekisting untuk lantai (papan mal)


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.660 105,000.00 69,300.00
2 Tukang L.02 OH 0.330 125,000.00 41,250.00
3 Kepala Tukang L.03 OH 0.033 145,000.00 4,785.00
4 Mandor L.04 OH 0.033 155,000.00 5,115.00
JUMLAH TENAGA KERJA 120,450.00
B BAHAN
1 Kayu kelas III m³ 0.040 2,500,000.00 100,000.00
2 Paku 5 - 12 cm Kg 0.400 23,000.00 9,200.00
3 Minyak Bekisting Liter - 8,100.00 -
4 Balok kayu kelas II m³ 0.015 3,355,000.00 50,325.00
5 Papan Mal kelas III m³ 0.022 2,558,000.00 56,276.00
6 Dolken kayu ф 8-10 cm - panj 4 m Batang 6.000 12,000.00 72,000.00
JUMLAH HARGA BAHAN 287,801.00
JUMLAH HARGA BAHAN x 55 % 158,290.55
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 278,740.55


E Overhead & Profit 15% x D 41,811.08
F Harga Satuan Pekerjaan (D+E) 320,551.63

4.1.1.25. Pemasangan 1m² bekisting untuk dinding


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.660 105,000.00 69,300.00
2 Tukang L.02 OH 0.330 125,000.00 41,250.00
3 Kepala Tukang L.03 OH 0.033 145,000.00 4,785.00
4 Mandor L.04 OH 0.033 155,000.00 5,115.00
JUMLAH TENAGA KERJA 120,450.00
B BAHAN
1 Kayu kelas III m³ 0.030 2,500,000.00 75,000.00
2 Paku 5 - 12 cm Kg 0.400 23,000.00 9,200.00
3 Minyak Bekisting Liter 0.200 8,100.00 1,620.00
4 Balok kayu kelas II m³ 0.020 3,355,000.00 67,100.00
5 Plywood tebal 9mm Lbr 0.350 220,000.00 77,000.00
6 Dolken kayu ф 8-10 cm - panj 4 m Batang 3.000 12,000.00 36,000.00
7 Penjaga jarak bekisting/spacer Buah 4.000 -
JUMLAH HARGA BAHAN 265,920.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 386,370.00


E Overhead & Profit 15% x D 57,955.50
F Harga Satuan Pekerjaan (D+E) 444,325.50

4.1.1.25.a. Pemasangan 1m² bekisting untuk dinding (papan mal)


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.660 105,000.00 69,300.00
2 Tukang L.02 OH 0.330 125,000.00 41,250.00
3 Kepala Tukang L.03 OH 0.033 145,000.00 4,785.00
4 Mandor L.04 OH 0.033 155,000.00 5,115.00
JUMLAH TENAGA KERJA 120,450.00
B BAHAN
1 Kayu kelas III m³ 0.030 2,500,000.00 75,000.00
2 Paku 5 - 12 cm Kg 0.400 23,000.00 9,200.00
3 Minyak Bekisting Liter - 8,100.00 -
4 Balok kayu kelas II m³ 0.020 3,355,000.00 67,100.00
5 Papan Mal kelas III m³ 0.022 2,558,000.00 56,276.00
6 Dolken kayu ф 8-10 cm - panj 4 m Batang 3.000 12,000.00 36,000.00
7 Penjaga jarak bekisting/spacer Buah 4.000 -
JUMLAH HARGA BAHAN 243,576.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 364,026.00


E Overhead & Profit 15% x D 54,603.90
F Harga Satuan Pekerjaan (D+E) 418,629.90

4.1.1.25.b. Pemasangan berulang 1m² bekisting untuk dinding (papan mal)


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.660 105,000.00 69,300.00
2 Tukang L.02 OH 0.330 125,000.00 41,250.00
3 Kepala Tukang L.03 OH 0.033 145,000.00 4,785.00
4 Mandor L.04 OH 0.033 155,000.00 5,115.00
JUMLAH TENAGA KERJA 120,450.00
B BAHAN
1 Kayu kelas III m³ 0.030 2,500,000.00 75,000.00
2 Paku 5 - 12 cm Kg 0.400 23,000.00 9,200.00
3 Minyak Bekisting Liter - 8,100.00 -
4 Balok kayu kelas II m³ 0.020 3,355,000.00 67,100.00
5 Papan Mal kelas III m³ 0.022 2,558,000.00 56,276.00
6 Dolken kayu ф 8-10 cm - panj 4 m Batang 3.000 12,000.00 36,000.00
7 Penjaga jarak bekisting/spacer Buah 4.000 -
JUMLAH HARGA BAHAN 243,576.00
JUMLAH HARGA BAHAN x 55 % 133,966.80
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 254,416.80


E Overhead & Profit 15% x D 38,162.52
F Harga Satuan Pekerjaan (D+E) 292,579.32

4.1.1.26. Pemasangan 1m² bekisting untuk tangga


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.660 105,000.00 69,300.00
2 Tukang L.02 OH 0.330 125,000.00 41,250.00
3 Kepala Tukang L.03 OH 0.033 145,000.00 4,785.00
4 Mandor L.04 OH 0.033 155,000.00 5,115.00
JUMLAH TENAGA KERJA 120,450.00
B BAHAN
1 Kayu kelas III m³ 0.030 2,500,000.00 75,000.00
2 Paku 5 - 12 cm Kg 0.400 23,000.00 9,200.00
3 Minyak Bekisting Liter 0.150 8,100.00 1,215.00
4 Balok kayu kelas II m³ 0.015 3,355,000.00 50,325.00
5 Plywood tebal 9mm Lbr 0.350 220,000.00 77,000.00
6 Dolken kayu ф 8-10 cm - panj 4 m Batang 2.000 12,000.00 24,000.00
JUMLAH HARGA BAHAN 236,740.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 357,190.00


E Overhead & Profit 15% x D 53,578.50
F Harga Satuan Pekerjaan (D+E) 410,768.50

4.1.1.27. Pemasangan 1m² jembatan untuk pengecoran beton


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang L.02 OH 0.050 125,000.00 6,250.00
3 Kepala Tukang L.03 OH 0.005 145,000.00 725.00
4 Mandor L.04 OH 0.008 155,000.00 1,240.00
JUMLAH TENAGA KERJA 23,965.00
B BAHAN
1 Kayu kelas III (papan) m³ 0.026 2,558,000.00 67,531.20
2 Paku 5 - 12 cm Kg 0.600 23,000.00 13,800.00
3 Dolken kayu ф 8-10 cm - panj 4 m Batang 0.500 12,000.00 6,000.00
JUMLAH HARGA BAHAN 87,331.20
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 111,296.20


E Overhead & Profit 15% x D 16,694.43
F Harga Satuan Pekerjaan (D+E) 127,990.63

4.1.1.35. Membuat 1 m³ kolom praktis beton bertulang (11 x 11 ) cm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.180 105,000.00 18,900.00
2 Tukang batu L.02 OH 0.020 125,000.00 2,500.00
3 Tukang kayu L.02 OH 0.020 125,000.00 2,500.00
4 Tukang Besi L.02 OH 0.020 125,000.00 2,500.00
5 Kepala Tukang L.03 OH 0.006 145,000.00 870.00
6 Mandor L.04 OH 0.009 155,000.00 1,395.00
JUMLAH TENAGA KERJA 28,665.00
B BAHAN
1 Kayu kelas III (papan) m³ 0.0022,558,000.00 5,116.00
2 Paku 5 - 12 cm Kg 0.010 23,000.00 230.00
3 Minyak bekisting Liter 8,100.00 -
4 Besi beton polos U 24 Kg 3.000 13,500.00 40,500.00
5 Kawat beton Kg 0.450 25,000.00 11,250.00
6 Semen portland Kg 4.000 1,500.00 6,000.00
7 Pasir beton m³ 0.006 125,000.00 750.00
8 Kerikil m³ 0.009 475,000.00 4,275.00
JUMLAH HARGA BAHAN 68,121.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 96,786.00


E Overhead & Profit 15% x D 14,517.90
F Harga Satuan Pekerjaan (D+E) 111,303.90

B.13.a.1. Membuat 1 m³ beton ready mix K 100 menggunakan pompa


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang L.02 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.100 155,000.00 15,500.00
JUMLAH TENAGA KERJA 155,375.00
B BAHAN
1 Beton Ready Mix K 100 m³ 1.020 1,072,500.00 1,093,950.00
JUMLAH HARGA BAHAN 1,093,950.00
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00 396,000.00
JUMLAH HARGA ALAT 396,000.00
D Jumlah (A+B+C) 1,645,325.00
E Overhead & Profit 15% x D 246,798.75
F Harga Satuan Pekerjaan (D+E) 1,892,123.75

B.13.a.2. Membuat 1 m³ beton ready mix K 100 tidak menggunakan pompa


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang L.02 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.100 155,000.00 15,500.00
JUMLAH TENAGA KERJA 155,375.00
B BAHAN
1 Beton Ready Mix K 100 m³ 1.020 1,072,500.00 1,093,950.00
JUMLAH HARGA BAHAN 1,093,950.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,249,325.00


E Overhead & Profit 15% x D 187,398.75
F Harga Satuan Pekerjaan (D+E) 1,436,723.75

B. 13.b.1 Membuat 1 m³ beton ready mix K 125 menggunakan pompa


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang L.02 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.100 155,000.00 15,500.00
JUMLAH TENAGA KERJA 155,375.00
B BAHAN
1 Beton Ready Mix K 125 m³ 1.020 1,108,250.00 1,130,415.00
JUMLAH HARGA BAHAN 1,130,415.00
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00 396,000.00
JUMLAH HARGA ALAT 396,000.00
D Jumlah (A+B+C) 1,681,790.00
E Overhead & Profit 15% x D 252,268.50
F Harga Satuan Pekerjaan (D+E) 1,934,058.50

B. 13.b.2 Membuat 1 m³ beton ready mix K 125 tidak menggunakan pompa


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang L.02 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.100 155,000.00 15,500.00
JUMLAH TENAGA KERJA 155,375.00
B BAHAN
1 Beton Ready Mix K 125 m³ 1.020 1,108,250.00 1,130,415.00
JUMLAH HARGA BAHAN 1,130,415.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,285,790.00


E Overhead & Profit 15% x D 192,868.50
F Harga Satuan Pekerjaan (D+E) 1,478,658.50

B. 13.c.1 Membuat 1 m³ beton ready mix K 150 menggunakan pompa


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang L.02 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.100 155,000.00 15,500.00
JUMLAH TENAGA KERJA 155,375.00
B BAHAN
1 Beton Ready Mix K 150 m³ 1.020 1,025,000.00 1,045,500.00
JUMLAH HARGA BAHAN 1,045,500.00
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00 396,000.00
JUMLAH HARGA ALAT 396,000.00

D Jumlah (A+B+C) 1,596,875.00


E Overhead & Profit 15% x D 239,531.25
F Harga Satuan Pekerjaan (D+E) 1,836,406.25

B. 13.c.2 Membuat 1 m³ beton ready mix K 150 tidak menggunakan pompa


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang L.02 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.100 155,000.00 15,500.00
JUMLAH TENAGA KERJA 155,375.00
B BAHAN
1 Beton Ready Mix K 150 m³ 1.020 1,025,000.00 1,045,500.00
JUMLAH HARGA BAHAN 1,045,500.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,200,875.00
E Overhead & Profit 15% x D 180,131.25
F Harga Satuan Pekerjaan (D+E) 1,381,006.25

B. 13.d.1 Membuat 1 m³ beton ready mix K 175 menggunakan pompa


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang L.02 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.100 155,000.00 15,500.00
JUMLAH TENAGA KERJA 155,375.00
B BAHAN
1 Beton Ready Mix K 175 m³ 1.020 1,194,050.00 1,217,931.00
JUMLAH HARGA BAHAN 1,217,931.00
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00 396,000.00
JUMLAH HARGA ALAT 396,000.00
D Jumlah (A+B+C) 1,769,306.00
E Overhead & Profit 15% x D 265,395.90
F Harga Satuan Pekerjaan (D+E) 2,034,701.90

B. 13.d.2 Membuat 1 m³ beton ready mix K 175 tidak menggunakan pompa


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang L.02 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.100 155,000.00 15,500.00
JUMLAH TENAGA KERJA 155,375.00
B BAHAN
1 Beton Ready Mix K 175 m³ 1.020 1,194,050.00 1,217,931.00
JUMLAH HARGA BAHAN 1,217,931.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,373,306.00


E Overhead & Profit 15% x D 205,995.90
F Harga Satuan Pekerjaan (D+E) 1,579,301.90

B. 13.e.1 Membuat 1 m³ beton ready mix K 200 menggunakan pompa


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang L.02 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.100 155,000.00 15,500.00
JUMLAH TENAGA KERJA 155,375.00
B BAHAN
1 Beton Ready Mix K 200 m³ 1.020 1,134,000.00 1,156,680.00
JUMLAH HARGA BAHAN 1,156,680.00
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00 396,000.00
JUMLAH HARGA ALAT 396,000.00
D Jumlah (A+B+C) 1,708,055.00
E Overhead & Profit 15% x D 256,208.25
F Harga Satuan Pekerjaan (D+E) 1,964,263.25

B. 13.e.2 Membuat 1 m³ beton ready mix K 200 tidak menggunakan pompa


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang L.02 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.100 155,000.00 15,500.00
JUMLAH TENAGA KERJA 155,375.00
B BAHAN
1 Beton Ready Mix K 200 m³ 1.020 1,134,000.00 1,156,680.00
JUMLAH HARGA BAHAN 1,156,680.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,312,055.00
E Overhead & Profit 15% x D 196,808.25
F Harga Satuan Pekerjaan (D+E) 1,508,863.25

B. 13.f.1 Membuat 1 m³ beton ready mix K 225 menggunakan pompa


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang L.02 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.100 155,000.00 15,500.00
JUMLAH TENAGA KERJA 155,375.00
B BAHAN
1 Beton Ready Mix K 225 m³ 1.020 1,329,800.00 1,356,396.00
JUMLAH HARGA BAHAN 1,356,396.00
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00 396,000.00
JUMLAH HARGA ALAT 396,000.00

D Jumlah (A+B+C) 1,907,771.00


E Overhead & Profit 15% x D 286,165.65
F Harga Satuan Pekerjaan (D+E) 2,193,936.65

B. 13.f.2 Membuat 1 m³ beton ready mix K 225 tidak menggunakan pompa


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang L.02 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.100 155,000.00 15,500.00
JUMLAH TENAGA KERJA 155,375.00
B BAHAN
1 Beton Ready Mix K 225 m³ 1.020 1,329,800.00 1,356,396.00
JUMLAH HARGA BAHAN 1,356,396.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,511,771.00
E Overhead & Profit 15% x D 226,765.65
F Harga Satuan Pekerjaan (D+E) 1,738,536.65

B. 13.g.1 Membuat 1 m³ beton ready mix K 250 menggunakan pompa


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang L.02 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.100 155,000.00 15,500.00
JUMLAH TENAGA KERJA 155,375.00
B BAHAN
1 Beton Ready Mix K 250 m³ 1.020 1,372,800.00 1,400,256.00
JUMLAH HARGA BAHAN 1,400,256.00
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00 396,000.00
JUMLAH HARGA ALAT 396,000.00
D Jumlah (A+B+C) 1,951,631.00
E Overhead & Profit 15% x D 292,744.65
F Harga Satuan Pekerjaan (D+E) 2,244,375.65

B. 13.g.2 Membuat 1 m³ beton ready mix K 250 tidak menggunakan pompa


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang L.02 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.100 155,000.00 15,500.00
JUMLAH TENAGA KERJA 155,375.00
B BAHAN
1 Beton Ready Mix K 250 m³ 1.020 1,372,800.00 1,400,256.00
JUMLAH HARGA BAHAN 1,400,256.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,555,631.00


E Overhead & Profit 15% x D 233,344.65
F Harga Satuan Pekerjaan (D+E) 1,788,975.65

B. 13.h.1 Membuat 1 m³ beton ready mix K 275 menggunakan pompa


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang L.02 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.100 155,000.00 15,500.00
JUMLAH TENAGA KERJA 155,375.00
B BAHAN
1 Beton Ready Mix K 275 m³ 1.020 1,240,000.00 1,264,800.00
JUMLAH HARGA BAHAN 1,264,800.00
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00 396,000.00
JUMLAH HARGA ALAT 396,000.00
D Jumlah (A+B+C) 1,816,175.00
E Overhead & Profit 15% x D 272,426.25
F Harga Satuan Pekerjaan (D+E) 2,088,601.25

B. 13.h.2 Membuat 1 m³ beton ready mix K 275 tidak menggunakan pompa


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang L.02 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.100 155,000.00 15,500.00
JUMLAH TENAGA KERJA 155,375.00
B BAHAN
1 Beton Ready Mix K 275 m³ 1.020 1,240,000.00 1,264,800.00
JUMLAH HARGA BAHAN 1,264,800.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,420,175.00


E Overhead & Profit 15% x D 213,026.25
F Harga Satuan Pekerjaan (D+E) 1,633,201.25

B. 13.i.1 Membuat 1 m³ beton ready mix K 300 menggunakan pompa


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang L.02 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.100 155,000.00 15,500.00
JUMLAH TENAGA KERJA 155,375.00
B BAHAN
1 Beton Ready Mix K 300 m³ 1.020 1,430,000.00 1,458,600.00
JUMLAH HARGA BAHAN 1,458,600.00
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00 396,000.00
JUMLAH HARGA ALAT 396,000.00
D Jumlah (A+B+C) 2,009,975.00
E Overhead & Profit 15% x D 301,496.25
F Harga Satuan Pekerjaan (D+E) 2,311,471.25

B. 13.i.2 Membuat 1 m³ beton ready mix K 300 tidak menggunakan pompa


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang L.02 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.100 155,000.00 15,500.00
JUMLAH TENAGA KERJA 155,375.00
B BAHAN
1 Beton Ready Mix K 300 m³ 1.020 1,430,000.00 1,458,600.00
JUMLAH HARGA BAHAN 1,458,600.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,613,975.00


E Overhead & Profit 15% x D 242,096.25
F Harga Satuan Pekerjaan (D+E) 1,856,071.25

B. 13.j.1 Membuat 1 m³ beton ready mix K 325 menggunakan pompa


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang L.02 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.100 155,000.00 15,500.00
JUMLAH TENAGA KERJA 155,375.00
B BAHAN
1 Beton Ready Mix K 325 m³ 1.020 1,306,500.00 1,332,630.00
JUMLAH HARGA BAHAN 1,332,630.00
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00 396,000.00
JUMLAH HARGA ALAT 396,000.00
D Jumlah (A+B+C) 1,884,005.00
E Overhead & Profit 15% x D 282,600.75
F Harga Satuan Pekerjaan (D+E) 2,166,605.75

B. 13.j.2 Membuat 1 m³ beton ready mix K 325 tidak menggunakan pompa


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang L.02 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.100 155,000.00 15,500.00
JUMLAH TENAGA KERJA 155,375.00
B BAHAN
1 Beton Ready Mix K 325 m³ 1.020 1,306,500.00 1,332,630.00
JUMLAH HARGA BAHAN 1,332,630.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,488,005.00
E Overhead & Profit 15% x D 223,200.75
F Harga Satuan Pekerjaan (D+E) 1,711,205.75

B. 13.k.1 Membuat 1 m³ beton ready mix K 350 menggunakan pompa


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang L.02 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.100 155,000.00 15,500.00
JUMLAH TENAGA KERJA 155,375.00
B BAHAN
1 Beton Ready Mix K 350 m³ 1.020 1,530,100.00 1,560,702.00
JUMLAH HARGA BAHAN 1,560,702.00
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00 396,000.00
JUMLAH HARGA ALAT 396,000.00

D Jumlah (A+B+C) 2,112,077.00


E Overhead & Profit 15% x D 316,811.55
F Harga Satuan Pekerjaan (D+E) 2,428,888.55

B. 13.k.2 Membuat 1 m³ beton ready mix K 350 tidak menggunakan pompa


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang L.02 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.100 155,000.00 15,500.00
JUMLAH TENAGA KERJA 155,375.00
B BAHAN
1 Beton Ready Mix K 350 m³ 1.020 1,530,100.00 1,560,702.00
JUMLAH HARGA BAHAN 1,560,702.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,716,077.00
E Overhead & Profit 15% x D 257,411.55
F Harga Satuan Pekerjaan (D+E) 1,973,488.55

B. 13.l.1 Membuat 1 m³ beton ready mix K 375 menggunakan pompa


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang L.02 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.100 155,000.00 15,500.00
JUMLAH TENAGA KERJA 155,375.00
B BAHAN
1 Beton Ready Mix K 375 m³ 1.020 1,377,500.00 1,405,050.00
JUMLAH HARGA BAHAN 1,405,050.00
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00 396,000.00
JUMLAH HARGA ALAT 396,000.00
D Jumlah (A+B+C) 1,956,425.00
E Overhead & Profit 15% x D 293,463.75
F Harga Satuan Pekerjaan (D+E) 2,249,888.75

B. 13.l.2 Membuat 1 m³ beton ready mix K 375 tidak menggunakan pompa


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang L.02 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.100 155,000.00 15,500.00
JUMLAH TENAGA KERJA 155,375.00
B BAHAN
1 Beton Ready Mix K 375 m³ 1.020 1,377,500.00 1,405,050.00
JUMLAH HARGA BAHAN 1,405,050.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,560,425.00


E Overhead & Profit 15% x D 234,063.75
F Harga Satuan Pekerjaan (D+E) 1,794,488.75

B. 13.m.1 Membuat 1 m³ beton ready mix K 400 menggunakan pompa


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang L.02 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.100 155,000.00 15,500.00
JUMLAH TENAGA KERJA 155,375.00
B BAHAN
1 Beton Ready Mix K 400 m³ 1.020 1,601,600.00 1,633,632.00
JUMLAH HARGA BAHAN 1,633,632.00
C PERALATAN
1 Pompa Ready mix Sewa-hari 0.120 3,300,000.00 396,000.00
JUMLAH HARGA ALAT 396,000.00

D Jumlah (A+B+C) 2,185,007.00


E Overhead & Profit 15% x D 327,751.05
F Harga Satuan Pekerjaan (D+E) 2,512,758.05

B. 13.m.3 Membuat 1 m³ beton ready mix K 400 tidak menggunakan pompa


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang L.02 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.100 155,000.00 15,500.00
JUMLAH TENAGA KERJA 155,375.00
B BAHAN
1 Beton Ready Mix K 400 m³ 1.020 1,601,600.00 1,633,632.00
JUMLAH HARGA BAHAN 1,633,632.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,789,007.00
E Overhead & Profit 15% x D 268,351.05
F Harga Satuan Pekerjaan (D+E) 2,057,358.05
4.2.1. HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM

4.2.1.1 Pemasangan 1 Kg besi profil


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.060 105,000.00 6,300.00
2 Tukang Las Kontruksi L.03 OH 0.060 125,000.00 7,500.00
3 Kepala Tukang L.03 OH 0.006 145,000.00 870.00
4 Mandor L.04 OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 15,135.00
B BAHAN
1 Besi profil Kg 1.150 17,000.00 19,550.00
JUMLAH HARGA BAHAN 19,550.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 34,685.00
E Overhead & Profit 15% x D 5,202.75
F Harga Satuan Pekerjaan (D+E) 39,887.75

4.2.1.2 Pemasangan 1 Kg rangka kuda-kuda baja IWF


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.060 105,000.00 6,300.00
2 Tukang Las Kontruksi L.03 OH 0.060 125,000.00 7,500.00
3 Kepala Tukang L.03 OH 0.006 145,000.00 870.00
4 Mandor L.04 OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 15,135.00
B BAHAN
1 Besi baja IWF Kg 1.150 17,000.00 19,550.00
JUMLAH HARGA BAHAN 19,550.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 34,685.00


E Overhead & Profit 15% x D 5,202.75
F Harga Satuan Pekerjaan (D+E) 39,887.75

4.2.1.3 Pengerjaan 100 kg pekerjaan perakitan


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.100 105,000.00 10,500.00
2 Tukang Las Kontruksi L.03 OH 0.100 125,000.00 12,500.00
3 Kepala Tukang L.03 OH 0.001 145,000.00 145.00
4 Mandor L.04 OH 0.005 155,000.00 775.00
JUMLAH TENAGA KERJA 23,920.00
B BAHAN
1 Solar Liter 1.000 8,100.00 8,100.00
2 Minyak pelumas Liter 0.100 28,800.00 2,880.00
JUMLAH HARGA BAHAN 10,980.00
C PERALATAN
1 Sewa alat Jam 0.800 70,000.00 56,000.00
JUMLAH HARGA ALAT 56,000.00

D Jumlah (A+B+C) 90,900.00


E Overhead & Profit 15% x D 13,635.00
F Harga Satuan Pekerjaan (D+E) 104,535.00

4.2.1.4 Pembuatan 1 m² pintu besi plat baja tebal 2mm rangkap, rangka baja siku
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
NO. URAIAN PEKERJAAN SATUAN KOEFISIEN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.050 105,000.00 110,250.00
2 Tukang Las Biasa L.03 OH 1.050 125,000.00 131,250.00
3 Kepala Tukang L.03 OH 0.105 145,000.00 15,225.00
4 Mandor L.04 OH 0.052 155,000.00 8,060.00
JUMLAH TENAGA KERJA 264,785.00
B BAHAN
1 Besi siku L 30.30.3 Kg 15.000 17,000.00 255,000.00
2 Besi plat baja Kg 32.800 17,000.00 557,600.00
3 Kawat las Kg 0.050 28,500.00 1,425.00
JUMLAH HARGA BAHAN 814,025.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,078,810.00
E Overhead & Profit 15% x D 161,821.50
F Harga Satuan Pekerjaan (D+E) 1,240,631.50

4.2.1.5 Pengerjaan 10 cm pengelasan dengan las listrik


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.040 105,000.00 4,200.00
2 Tukang Las Biasa L.03 OH 0.020 125,000.00 2,500.00
3 Kepala Tukang L.03 OH 0.002 145,000.00 290.00
4 Mandor L.04 OH 0.002 155,000.00 310.00
JUMLAH TENAGA KERJA 7,300.00
B BAHAN
1 Kawat Las listrik Kg 0.400 28,500.00 11,400.00
2 Solar Liter 0.300 8,100.00 2,430.00
3 Minyak pelumas Liter 0.040 28,800.00 1,152.00
JUMLAH HARGA BAHAN 14,982.00
C PERALATAN
1 Sewa alat Jam 0.170 70,000.00 11,900.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 22,282.00
E Overhead & Profit 15% x D 3,342.30
F Harga Satuan Pekerjaan (D+E) 25,624.30

4.2.1.14 Pemasangan 1 m² venetions blinds dan vertical blinds


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.350 105,000.00 36,750.00
2 Tukang L.03 OH 0.350 125,000.00 43,750.00
3 Kepala Tukang L.03 OH 0.035 145,000.00 5,075.00
4 Mandor L.04 OH 0.018 155,000.00 2,790.00
JUMLAH TENAGA KERJA 88,365.00
B BAHAN
venetions blinds dan vertical blinds
1 m 1.000 -
(tirai)
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 88,365.00


E Overhead & Profit 15% x D 13,254.75
F Harga Satuan Pekerjaan (D+E) 101,619.75

4.2.1.15 Pemasangan 1 m² terali besi strip (2x3) mm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.670 105,000.00 175,350.00
2 Tukang L.03 OH 1.670 125,000.00 208,750.00
3 Kepala Tukang L.03 OH 0.167 145,000.00 24,215.00
4 Mandor L.04 OH 0.083 155,000.00 12,865.00
JUMLAH TENAGA KERJA 421,180.00
B BAHAN
1 Besi strip Kg 6.177 17,000.00 105,009.00
2 Pengelasan cm 27.080 2,228.20 60,339.66
JUMLAH HARGA BAHAN 165,348.66
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 586,528.66


E Overhead & Profit 15% x D 87,979.30
F Harga Satuan Pekerjaan (D+E) 674,507.95

4.2.1.17 Pemasangan 1 m² jendela nako dan tralis


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.200 105,000.00 21,000.00
2 Tukang L.03 OH 0.200 125,000.00 25,000.00
3 Kepala Tukang L.03 OH 0.020 145,000.00 2,900.00
4 Mandor L.04 OH 0.001 155,000.00 155.00
JUMLAH TENAGA KERJA 49,055.00
B BAHAN
1 Jendela nako (rangka + kaca 5mm) m² 1.100 400,000.00 440,000.00
2 Paku 1 cm - 2,5 cm buah 10.000 23,000.00 230,000.00
3 Besi strip Kg 7.000 17,000.00 119,000.00
JUMLAH HARGA BAHAN 789,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 838,055.00
E Overhead & Profit 15% x D 125,708.25
F Harga Satuan Pekerjaan (D+E) 963,763.25

4.2.1.18 Pemasangan 1 m² talang datar/jurai seng bjls 30 lebar 90 cm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.200 105,000.00 21,000.00
2 Tukang L.03 OH 0.200 125,000.00 25,000.00
3 Kepala Tukang L.03 OH 0.020 145,000.00 2,900.00
4 Mandor L.04 OH 0.001 155,000.00 155.00
JUMLAH TENAGA KERJA 49,055.00
B BAHAN
1 Seng plat m² 1.050 80,000.00 84,000.00
2 Paku 1 cm - 2,5 cm Kg 0.015 23,000.00 345.00
3 Papan kayu kelas II m³ 0.019 7,060,000.00 134,140.00
JUMLAH HARGA BAHAN 218,485.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 267,540.00
E Overhead & Profit 15% x D 40,131.00
F Harga Satuan Pekerjaan (D+E) 307,671.00

4.2.1.19 Pemasangan 1 m² talang talang ½ lingkaran D-15, seng plat bjls 30 lebar 45 cm
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang L.03 OH 0.300 125,000.00 37,500.00
3 Kepala Tukang L.03 OH 0.030 145,000.00 4,350.00
4 Mandor L.04 OH 0.008 155,000.00 1,240.00
JUMLAH TENAGA KERJA 58,840.00
B BAHAN
1 Seng plat m² 1.050 42,500.00 44,625.00
2 Paku 1 cm - 2,5 cm Kg 0.010 23,000.00 230.00
3 Besi strip Kg 0.500 17,000.00 8,500.00
JUMLAH HARGA BAHAN 53,355.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 112,195.00


E Overhead & Profit 15% x D 16,829.25
F Harga Satuan Pekerjaan (D+E) 129,024.25
4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING
4.4.1.3 Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal 1 bata campuran 1SP:4PP
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.600 105,000.00 63,000.00
2 Tukang batu L.02 OH 0.200 125,000.00 25,000.00
3 Kepala Tukang L.03 OH 0.020 145,000.00 2,900.00
4 Mandor L.04 OH 0.030 155,000.00 4,650.00
JUMLAH TENAGA KERJA 95,550.00
B BAHAN
1 Bata Merah bh 140.000 2,000.00 280,000.00
2 Semen Portland Kg 26.550 1,500.00 39,825.00
3 Pasir pasang m³ 0.093 125,000.00 11,625.00
JUMLAH HARGA BAHAN 331,450.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 427,000.00
E Overhead & Profit 15% x D 64,050.00
F Harga Satuan Pekerjaan (D+E) 491,050.00

4.4.1.9 Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal ½ bata campuran 1SP:4PP
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.300 105,000.00 31,500.00
2 Tukang batu L.02 OH 0.100 125,000.00 12,500.00
3 Kepala Tukang L.03 OH 0.010 145,000.00 1,450.00
4 Mandor L.04 OH 0.015 155,000.00 2,325.00
JUMLAH TENAGA KERJA 47,775.00
B BAHAN
1 Bata Merah bh 70.000 2,000.00 140,000.00
2 Semen Portland Kg 11.500 1,500.00 17,250.00
3 Pasir pasang m³ 0.043 125,000.00 5,375.00
JUMLAH HARGA BAHAN 162,625.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 210,400.00
E Overhead & Profit 15% x D 31,560.00
F Harga Satuan Pekerjaan (D+E) 241,960.00

4.4.1.17 Pemasangan 1 m² dinding conblock HB20 1SP:4PP


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.350 105,000.00 36,750.00
2 Tukang batu L.02 OH 0.150 125,000.00 18,750.00
3 Kepala Tukang L.03 OH 0.015 145,000.00 2,175.00
4 Mandor L.04 OH 0.018 155,000.00 2,790.00
JUMLAH TENAGA KERJA 60,465.00
B BAHAN
1 HB-20 m³ 12.500 -
2 Semen portland Kg 24.260 1,500.00 36,390.00
3 Pasir pasang m³ 0.772 125,000.00 96,500.00
4 Besi angker diameter 8 kg 0.280 13,500.00 3,780.00
JUMLAH HARGA BAHAN 136,670.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 197,135.00
E Overhead & Profit 15% x D 29,570.25
F Harga Satuan Pekerjaan (D+E) 226,705.25

4.4.1.17.a Pemasangan 1 m² dinding batako uk. 20/40/9


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.350 105,000.00 36,750.00
2 Tukang batu L.02 OH 0.150 125,000.00 18,750.00
3 Kepala Tukang L.03 OH 0.015 145,000.00 2,175.00
4 Mandor L.04 OH 0.018 155,000.00 2,790.00
JUMLAH TENAGA KERJA 60,465.00
B BAHAN
1 Batako 20/40/9 (cetak mesin) Bh 12.500 2,500.00 31,250.00
2 Semen Portland Kg 7.500 1,500.00 11,250.00
3 Pasir pasang m³ 0.027 125,000.00 3,375.00
JUMLAH HARGA BAHAN 45,875.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 106,340.00
E Overhead & Profit 15% x D 15,951.00
F Harga Satuan Pekerjaan (D+E) 122,291.00

4.4.1.17.b Pemasangan 1 m² dinding batako 20/40/7


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.350 105,000.00 36,750.00
2 Tukang batu L.02 OH 0.150 125,000.00 18,750.00
3 Kepala Tukang L.03 OH 0.015 145,000.00 2,175.00
4 Mandor L.04 OH 0.018 155,000.00 2,790.00
JUMLAH TENAGA KERJA 60,465.00
B BAHAN
1 Batako 20/40/7 (cetak mesin) Bh 12.500 2,300.00 28,750.00
2 Semen Portland Kg 7.500 1,500.00 11,250.00
3 Pasir pasang m³ 0.027 125,000.00 3,375.00
JUMLAH HARGA BAHAN 43,375.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 103,840.00
E Overhead & Profit 15% x D 15,576.00
F Harga Satuan Pekerjaan (D+E) 119,416.00

4.4.1.19 Pemasangan 1 m² dinding conblock HB15 1SP:4PP


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.320 105,000.00 33,600.00
2 Tukang batu L.02 OH 0.120 125,000.00 15,000.00
3 Kepala Tukang L.03 OH 0.012 145,000.00 1,740.00
4 Mandor L.04 OH 0.016 155,000.00 2,480.00
JUMLAH TENAGA KERJA 52,820.00
B BAHAN
1 HB-15 m³ 12.500 -
2 Semen portland Kg 18.200 1,500.00 27,300.00
3 Pasir pasang m³ 0.582 125,000.00 72,750.00
4 Besi angker diameter 8 kg 0.280 13,500.00 3,780.00
JUMLAH HARGA BAHAN 103,830.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 156,650.00
E Overhead & Profit 15% x D 23,497.50
F Harga Satuan Pekerjaan (D+E) 180,147.50

4.4.1.19.a. Pemasangan 1 m² dinding batako 15/30/7


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.320 105,000.00 33,600.00
2 Tukang batu L.02 OH 0.120 125,000.00 15,000.00
3 Kepala Tukang L.03 OH 0.012 145,000.00 1,740.00
4 Mandor L.04 OH 0.016 155,000.00 2,480.00
JUMLAH TENAGA KERJA 52,820.00
B BAHAN
1 Batako 15/30/7 (cetak mesin) Bh 22.000 1,800.00 39,600.00
2 Semen Portland Kg 7.500 1,500.00 11,250.00
3 Pasir pasang m³ 0.027 125,000.00 3,375.00
JUMLAH HARGA BAHAN 54,225.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 107,045.00
E Overhead & Profit 15% x D 16,056.75
F Harga Satuan Pekerjaan (D+E) 123,101.75

4.4.1.23 Pemasangan 1 m² dinding terawang (rooster) 12x11x24 campuran 1SP:4PP


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
NO. URAIAN PEKERJAAN SATUAN KOEFISIEN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.300 105,000.00 31,500.00
2 Tukang batu L.02 OH 0.100 125,000.00 12,500.00
3 Kepala Tukang L.03 OH 0.010 145,000.00 1,450.00
4 Mandor L.04 OH 0.015 155,000.00 2,325.00
JUMLAH TENAGA KERJA 47,775.00
B BAHAN
1 Bata berongga m³ 30.000 20,000.00 600,000.00
2 Semen portland Kg 11.000 1,520.00 16,720.00
3 Pasir pasang m³ 0.035 89,000.00 3,115.00
JUMLAH HARGA BAHAN 619,835.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 667,610.00
E Overhead & Profit 15% x D 100,141.50
F Harga Satuan Pekerjaan (D+E) 767,751.50

4.4.1.23.a Pemasangan 1 m² dinding terawang (rooster) 18x18 campuran 1SP:4PP


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.300 105,000.00 31,500.00
2 Tukang batu L.02 OH 0.100 125,000.00 12,500.00
3 Kepala Tukang L.03 OH 0.010 145,000.00 1,450.00
4 Mandor L.04 OH 0.015 155,000.00 2,325.00
JUMLAH TENAGA KERJA 47,775.00
B BAHAN
1 Rooster 18 x 18 cm Bh 30.000 20,000.00 600,000.00
2 Semen portland Kg 11.000 1,500.00 16,500.00
3 Pasir pasang m³ 0.035 125,000.00 4,375.00
JUMLAH HARGA BAHAN 620,875.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 668,650.00
E Overhead & Profit 15% x D 100,297.50
F Harga Satuan Pekerjaan (D+E) 768,947.50
4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN

4.4.2.1 Pemasangan 1 m² plesteran 1SP:1PP tebal 15mm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.300 105,000.00 31,500.00
2 Tukang batu L.03 OH 0.150 125,000.00 18,750.00
3 Kepala Tukang L.03 OH 0.015 145,000.00 2,175.00
4 Mandor L.04 OH 0.015 155,000.00 2,325.00
JUMLAH TENAGA KERJA 54,750.00
B BAHAN
1 PC Kg 15.504 1,500.00 23,256.00
2 PP m³ 0.016 125,000.00 2,000.00
JUMLAH HARGA BAHAN 25,256.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 80,006.00


E Overhead & Profit 15% x D 12,000.90
F Harga Satuan Pekerjaan (D+E) 92,006.90

4.4.2.2 Pemasangan 1 m² plesteran 1SP:2PP tebal 15mm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.300 105,000.00 31,500.00
2 Tukang batu L.03 OH 0.150 125,000.00 18,750.00
3 Kepala Tukang L.03 OH 0.015 145,000.00 2,175.00
4 Mandor L.04 OH 0.015 155,000.00 2,325.00
JUMLAH TENAGA KERJA 54,750.00
B BAHAN
1 PC Kg 10.224 1,500.00 15,336.00
2 PP m³ 0.020 125,000.00 2,500.00
JUMLAH HARGA BAHAN 17,836.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 72,586.00


E Overhead & Profit 15% x D 10,887.90
F Harga Satuan Pekerjaan (D+E) 83,473.90

4.4.2.3 Pemasangan 1 m² plesteran 1SP:3PP tebal 15mm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.300 105,000.00 31,500.00
2 Tukang batu L.03 OH 0.150 125,000.00 18,750.00
3 Kepala Tukang L.03 OH 0.015 145,000.00 2,175.00
4 Mandor L.04 OH 0.015 155,000.00 2,325.00
JUMLAH TENAGA KERJA 54,750.00
B BAHAN
1 PC Kg 7.776 1,500.00 11,664.00
2 PP m³ 0.023 125,000.00 2,875.00
JUMLAH HARGA BAHAN 14,539.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 69,289.00
E Overhead & Profit 15% x D 10,393.35
F Harga Satuan Pekerjaan (D+E) 79,682.35

4.4.2.4 Pemasangan 1 m² plesteran 1SP:4PP tebal 15mm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.300 105,000.00 31,500.00
2 Tukang batu L.03 OH 0.150 125,000.00 18,750.00
3 Kepala Tukang L.03 OH 0.015 145,000.00 2,175.00
4 Mandor L.04 OH 0.015 155,000.00 2,325.00
JUMLAH TENAGA KERJA 54,750.00
B BAHAN
1 PC Kg 6.240 1,500.00 9,360.00
2 PP m³ 0.024 125,000.00 3,000.00
JUMLAH HARGA BAHAN 12,360.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 67,110.00


E Overhead & Profit 15% x D 10,066.50
F Harga Satuan Pekerjaan (D+E) 77,176.50

4.4.2.13 Pemasangan 1 m² plesteran 1SP: 1PP tebal 20mm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.400 105,000.00 42,000.00
2 Tukang batu L.03 OH 0.200 125,000.00 25,000.00
3 Kepala Tukang L.03 OH 0.020 145,000.00 2,900.00
4 Mandor L.04 OH 0.022 155,000.00 3,410.00
JUMLAH TENAGA KERJA 73,310.00
B BAHAN
1 PC Kg 13.632 1,500.00 20,448.00
2 PP m³ 0.027 125,000.00 3,375.00
JUMLAH HARGA BAHAN 23,823.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 97,133.00


E Overhead & Profit 15% x D 14,569.95
F Harga Satuan Pekerjaan (D+E) 111,702.95

4.4.2.14 Pemasangan 1 m² plesteran 1SP: 3PP tebal 20mm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.260 105,000.00 27,300.00
2 Tukang batu L.03 OH 0.200 125,000.00 25,000.00
3 Kepala Tukang L.03 OH 0.020 145,000.00 2,900.00
4 Mandor L.04 OH 0.013 155,000.00 2,015.00
JUMLAH TENAGA KERJA 57,215.00
B BAHAN
1 PC Kg 10.368 1,500.00 15,552.00
2 PP m³ 0.031 125,000.00 3,875.00
JUMLAH HARGA BAHAN 19,427.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 76,642.00


E Overhead & Profit 15% x D 11,496.30
F Harga Satuan Pekerjaan (D+E) 88,138.30

4.4.2.15 Pemasangan 1 m² plesteran 1SP: 4PP tebal 20mm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.400 105,000.00 42,000.00
2 Tukang batu L.03 OH 0.200 125,000.00 25,000.00
3 Kepala Tukang L.03 OH 0.020 145,000.00 2,900.00
4 Mandor L.04 OH 0.022 155,000.00 3,410.00
JUMLAH TENAGA KERJA 73,310.00
B BAHAN
1 PC Kg 8.320 1,500.00 12,480.00
2 PP m³ 0.032 125,000.00 4,000.00
JUMLAH HARGA BAHAN 16,480.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 89,790.00


E Overhead & Profit 15% x D 13,468.50
F Harga Satuan Pekerjaan (D+E) 103,258.50
4.4.2.20 Pemasangan 1 m² plesteran 1SP : 3PP lebar 10mm
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.080 105,000.00 8,400.00
2 Tukang batu L.03 OH 0.400 125,000.00 50,000.00
3 Kepala Tukang L.03 OH 0.040 145,000.00 5,800.00
4 Mandor L.04 OH 0.004 155,000.00 620.00
JUMLAH TENAGA KERJA 64,820.00
B BAHAN
1 Semen PC Kg 0.500 1,500.00 750.00
2 Pasir pasang m³ 0.013 125,000.00 1,625.00
JUMLAH HARGA BAHAN 2,375.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 67,195.00


E Overhead & Profit 15% x D 10,079.25
F Harga Satuan Pekerjaan (D+E) 77,274.25

4.4.2.23 Pemasangan 1 m² plesteran ciprat 1SP : 2PP


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.300 105,000.00 31,500.00
2 Tukang batu L.03 OH 0.100 125,000.00 12,500.00
3 Kepala Tukang L.03 OH 0.010 145,000.00 1,450.00
4 Mandor L.04 OH 0.015 155,000.00 2,325.00
JUMLAH TENAGA KERJA 47,775.00
B BAHAN
1 Semen PC Kg 4.320 1,500.00 6,480.00
2 Pasir Pasang m³ 0.006 125,000.00 750.00
JUMLAH HARGA BAHAN 7,230.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 55,005.00


E Overhead & Profit 15% x D 8,250.75
F Harga Satuan Pekerjaan (D+E) 63,255.75

4.4.2.24 Pemasangan 1 m² finishing siar pasangan bata merah


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang batu L.03 OH 0.075 125,000.00 9,375.00
3 Kepala Tukang L.03 OH 0.008 145,000.00 1,160.00
4 Mandor L.04 OH 0.008 155,000.00 1,240.00
JUMLAH TENAGA KERJA 27,525.00
B BAHAN
1 Semen PC Kg 3.108 1,500.00 4,662.00
JUMLAH HARGA BAHAN 4,662.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 32,187.00


E Overhead & Profit 15% x D 4,828.05
F Harga Satuan Pekerjaan (D+E) 37,015.05

4.4.2.25 Pemasangan 1 m² finishing siar pasangan conblock ekspose


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.070 105,000.00 7,350.00
2 Tukang batu L.03 OH 0.035 125,000.00 4,375.00
3 Kepala Tukang L.03 OH 0.004 145,000.00 580.00
4 Mandor L.04 OH 0.004 155,000.00 620.00
JUMLAH TENAGA KERJA 12,925.00
B BAHAN
1 Semen PC Kg 1.600 1,500.00 2,400.00
JUMLAH HARGA BAHAN 2,400.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 15,325.00


E Overhead & Profit 15% x D 2,298.75
F Harga Satuan Pekerjaan (D+E) 17,623.75

4.4.2.26 Pemasangan 1 m² finishing siar pasangan batu kali, campuran 1SP:2PP


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.300 105,000.00 31,500.00
2 Tukang batu L.03 OH 0.150 125,000.00 18,750.00
3 Kepala Tukang L.03 OH 0.015 145,000.00 2,175.00
4 Mandor L.04 OH 0.015 155,000.00 2,325.00
JUMLAH TENAGA KERJA 54,750.00
B BAHAN
1 Semen PC Kg 6.340 1,500.00 9,510.00
2 Pasir pasang m³ 0.012 125,000.00 1,500.00
JUMLAH HARGA BAHAN 11,010.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 65,760.00


E Overhead & Profit 15% x D 9,864.00
F Harga Satuan Pekerjaan (D+E) 75,624.00

4.4.2.27 Pemasangan 1 m² acian


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.200 105,000.00 21,000.00
2 Tukang batu L.03 OH 0.100 125,000.00 12,500.00
3 Kepala Tukang L.03 OH 0.010 145,000.00 1,450.00
4 Mandor L.04 OH 0.010 155,000.00 1,550.00
JUMLAH TENAGA KERJA 36,500.00
B BAHAN
1 Semen PC Kg 3.250 1,500.00 4,875.00
JUMLAH HARGA BAHAN 4,875.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 41,375.00


E Overhead & Profit 15% x D 6,206.25
F Harga Satuan Pekerjaan (D+E) 47,581.25
4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

4.4.3.34.a. Pemasangan 1 m² lantai keramik 40 cm x 40 cm polished (setaraf indogres)


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.700 105,000.00 73,500.00
2 Tukang batu L.02 OH 0.350 125,000.00 43,750.00
3 Kepala Tukang L.03 OH 0.035 145,000.00 5,075.00
4 Mandor L.04 OH 0.035 155,000.00 5,425.00
JUMLAH TENAGA KERJA 127,750.00
B BAHAN
1 keramik 40 X 40 cm Bh 6.250 25,833.33 161,458.33
2 Semen Portlan Kg 8.190 1,500.00 12,285.00
3 Pasir pasang m³ 0.045 125,000.00 5,625.00
4 Semen warna Kg 0.150 14,000.00 2,100.00
JUMLAH HARGA BAHAN 181,468.33
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 309,218.33
E Overhead & Profit 15% x D 46,382.75
F Harga Satuan Pekerjaan (D+E) 355,601.08

4.4.3.34.b Pemasangan 1 m² lantai keramik 40 cm x 40 cm unpolished (setaraf indogres)


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.700 105,000.00 73,500.00
2 Tukang batu L.02 OH 0.350 125,000.00 43,750.00
3 Kepala Tukang L.03 OH 0.035 145,000.00 5,075.00
4 Mandor L.04 OH 0.035 155,000.00 5,425.00
JUMLAH TENAGA KERJA 127,750.00
B BAHAN
1 Keramik 40 X 40 cm Bh 6.250 25,833.33 161,458.33
2 Semen Portlan Kg 8.190 1,500.00 12,285.00
3 Pasir pasang m³ 0.045 125,000.00 5,625.00
4 Semen warna Kg 0.150 14,000.00 2,100.00
JUMLAH HARGA BAHAN 181,468.33
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 309,218.33


E Overhead & Profit 15% x D 46,382.75
F Harga Satuan Pekerjaan (D+E) 355,601.08

4.4.3.35 Pemasangan 1 m² lantai keramik 30 cm x 30 cm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.700 105,000.00 73,500.00
2 Tukang batu L.02 OH 0.350 125,000.00 43,750.00
3 Kepala Tukang L.03 OH 0.035 145,000.00 5,075.00
4 Mandor L.04 OH 0.035 155,000.00 5,425.00
JUMLAH TENAGA KERJA 127,750.00
B BAHAN
1 Keramik 30 x 30 cm ex roman Bh 11.870 9,090.91 107,909.09
2 Semen Portlan Kg 10.000 1,500.00 15,000.00
3 Pasir pasang m³ 0.045 125,000.00 5,625.00
4 Semen warna Kg 1.500 14,000.00 21,000.00
JUMLAH HARGA BAHAN 149,534.09
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 277,284.09
E Overhead & Profit 15% x D 41,592.61
F Harga Satuan Pekerjaan (D+E) 318,876.70

4.4.3.35.a Pemasangan 1 m² lantai keramik 30 cm x 30 cm polished


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.700 105,000.00 73,500.00
2 Tukang batu L.02 OH 0.350 125,000.00 43,750.00
3 Kepala Tukang L.03 OH 0.035 145,000.00 5,075.00
4 Mandor L.04 OH 0.035 155,000.00 5,425.00
JUMLAH TENAGA KERJA 127,750.00
B BAHAN
1 Keramik 30 x 30 cm polish Bh 11.870 9,090.91 107,909.09
2 Semen Portlan Kg 10.000 1,500.00 15,000.00
3 Pasir pasang m³ 0.045 125,000.00 5,625.00
4 Semen warna Kg 0.150 14,000.00 2,100.00
JUMLAH HARGA BAHAN 130,634.09
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 258,384.09
E Overhead & Profit 15% x D 38,757.61
F Harga Satuan Pekerjaan (D+E) 297,141.70

4.4.3.35.b Pemasangan 1 m² lantai keramik 30 cm x 30 cm unpolished


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.700 105,000.00 73,500.00
2 Tukang batu L.02 OH 0.350 125,000.00 43,750.00
3 Kepala Tukang L.03 OH 0.035 145,000.00 5,075.00
4 Mandor L.04 OH 0.035 155,000.00 5,425.00
JUMLAH TENAGA KERJA 127,750.00
B BAHAN
1 Keramik 30 x 30 cm Bh 11.870 9,090.91 107,909.09
2 Semen Portlan Kg 10.000 1,500.00 15,000.00
3 Pasir pasang m³ 0.045 125,000.00 5,625.00
4 Semen warna Kg 0.150 14,000.00 2,100.00
JUMLAH HARGA BAHAN 130,634.09
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 258,384.09
E Overhead & Profit 15% x D 38,757.61
F Harga Satuan Pekerjaan (D+E) 297,141.70

4.4.3.35.c Pemasangan 1 m² lantai keramik artistik 30 cm x 30 cm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.700 105,000.00 73,500.00
2 Tukang batu L.02 OH 0.350 125,000.00 43,750.00
3 Kepala Tukang L.03 OH 0.035 145,000.00 5,075.00
4 Mandor L.04 OH 0.035 155,000.00 5,425.00
JUMLAH TENAGA KERJA 127,750.00
B BAHAN
1 Keramik 30 x 30 cm Bh 11.870 9,090.91 107,909.09
2 Semen Portlan Kg 10.000 1,500.00 15,000.00
3 Pasir pasang m³ 0.045 125,000.00 5,625.00
4 Semen warna Kg 0.150 14,000.00 2,100.00
JUMLAH HARGA BAHAN 130,634.09
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 258,384.09
E Overhead & Profit 15% x D 38,757.61
F Harga Satuan Pekerjaan (D+E) 297,141.70

4.4.3.36 Pemasangan 1 m² lantai keramik 20 cm x 20 cm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.700 105,000.00 73,500.00
2 Tukang batu L.02 OH 0.350 125,000.00 43,750.00
3 Kepala Tukang L.03 OH 0.035 145,000.00 5,075.00
4 Mandor L.04 OH 0.035 155,000.00 5,425.00
JUMLAH TENAGA KERJA 127,750.00
B BAHAN
1 Keramik 20 x 20 cm ex roman Bh 26.500 3,460.00 91,690.00
2 Semen Portlan Kg 10.400 1,500.00 15,600.00
3 Pasir pasang m³ 0.045 125,000.00 5,625.00
4 Semen warna Kg 0.162 14,000.00 2,268.00
JUMLAH HARGA BAHAN 115,183.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 242,933.00
E Overhead & Profit 15% x D 36,439.95
F Harga Satuan Pekerjaan (D+E) 279,372.95

4.4.3.41 Pemasangan 1 m² plint keramik ukuran 5 cm x 20 cm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.090 105,000.00 9,450.00
2 Tukang batu L.02 OH 0.090 125,000.00 11,250.00
3 Kepala Tukang L.03 OH 0.035 145,000.00 5,075.00
4 Mandor L.04 OH 0.005 155,000.00 775.00
JUMLAH TENAGA KERJA 26,550.00
B BAHAN
1 Plint keramik Bh 5.300 -
2 Semen Portlan Kg 0.570 1,500.00 855.00
3 Pasir pasang m³ 0.002 125,000.00 187.50
4 Semen warna Kg 0.013 14,000.00 182.00
JUMLAH HARGA BAHAN 1,224.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 27,774.50
E Overhead & Profit 15% x D 4,166.18
F Harga Satuan Pekerjaan (D+E) 31,940.68

4.4.3.41.a Pemasangan 1 m² plint keramik ukuran 8 cm x 20 cm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.090 105,000.00 9,450.00
2 Tukang batu L.02 OH 0.090 125,000.00 11,250.00
3 Kepala Tukang L.03 OH 0.035 145,000.00 5,075.00
4 Mandor L.04 OH 0.005 155,000.00 775.00
JUMLAH TENAGA KERJA 26,550.00
B BAHAN
1 Plint keramik 8 x 20 cm Bh 5.300 11,600.00 61,480.00
2 Semen Portlan Kg 0.570 1,500.00 855.00
3 Pasir pasang m³ 0.002 125,000.00 187.50
4 Semen warna Kg 0.013 14,000.00 182.00
JUMLAH HARGA BAHAN 62,704.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 89,254.50
E Overhead & Profit 15% x D 13,388.18
F Harga Satuan Pekerjaan (D+E) 102,642.68

4.4.3.43 Pemasangan 1 m² lantai marmer artistik 100cm x 100cm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.700 105,000.00 73,500.00
2 Tukang batu L.02 OH 0.350 125,000.00 43,750.00
3 Kepala Tukang L.03 OH 0.035 145,000.00 5,075.00
4 Mandor L.04 OH 0.035 155,000.00 5,425.00
JUMLAH TENAGA KERJA 127,750.00
B BAHAN
1 Marmer Bh 1.060 1,400,000.00 1,484,000.00
2 Semen Portlan Kg 8.190 1,500.00 12,285.00
3 Pasir pasang m³ 0.045 125,000.00 5,625.00
4 Semen warna Kg 0.650 14,000.00 9,100.00
JUMLAH HARGA BAHAN 1,511,010.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,638,760.00
E Overhead & Profit 15% x D 245,814.00
F Harga Satuan Pekerjaan (D+E) 1,884,574.00

4.4.3.44 Pemasangan 1 m² lantai karpet


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.170 105,000.00 17,850.00
2 Tukang batu L.02 OH 0.170 125,000.00 21,250.00
3 Kepala Tukang L.03 OH 0.017 145,000.00 2,465.00
4 Mandor L.04 OH 0.009 155,000.00 1,395.00
JUMLAH TENAGA KERJA 42,960.00
B BAHAN
1 Karpet m² 1.050 -
2 Lem Kg 0.350 20,000.00 7,000.00
JUMLAH HARGA BAHAN 7,000.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 49,960.00


E Overhead & Profit 15% x D 7,494.00
F Harga Satuan Pekerjaan (D+E) 57,454.00

4.4.3.45 Pemasangan 1 m² underlayer (lapisan bawah karpet)


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.120 105,000.00 12,600.00
2 Tukang batu L.02 OH 0.120 125,000.00 15,000.00
3 Kepala Tukang L.03 OH 0.012 145,000.00 1,740.00
4 Mandor L.04 OH 0.006 155,000.00 930.00
JUMLAH TENAGA KERJA 30,270.00
B BAHAN
1 Underlayer m² 1.050 -
2 Lem Kg 0.350 20,000.00 7,000.00
JUMLAH HARGA BAHAN 7,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 37,270.00
E Overhead & Profit 15% x D 5,590.50
F Harga Satuan Pekerjaan (D+E) 42,860.50

4.4.3.46 Pemasangan 1 m² parquet kayu


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.700 105,000.00 73,500.00
2 Tukang batu L.02 OH 0.350 125,000.00 43,750.00
3 Kepala Tukang L.03 OH 0.035 145,000.00 5,075.00
4 Mandor L.04 OH 0.035 155,000.00 5,425.00
JUMLAH TENAGA KERJA 127,750.00
B BAHAN
1 Parquet m² 1.050 420,000.00 441,000.00
2 Lem Kg 0.600 20,000.00 12,000.00
JUMLAH HARGA BAHAN 453,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 580,750.00


E Overhead & Profit 15% x D 87,112.50
F Harga Satuan Pekerjaan (D+E) 667,862.50

4.4.3.54 Pemasangan 1 m² dinding keramik 20 cm x 20 cm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.900 105,000.00 94,500.00
2 Tukang batu L.02 OH 0.450 125,000.00 56,250.00
3 Kepala Tukang L.03 OH 0.045 145,000.00 6,525.00
4 Mandor L.04 OH 0.045 155,000.00 6,975.00
JUMLAH TENAGA KERJA 164,250.00
B BAHAN
1 Keramik 20 x 20 cm ex roman Bh 26.500 3,950.00 104,675.00
2 Semen portlan Kg 9.300 1,500.00 13,950.00
3 Pasir pasng m³ 0.018 125,000.00 2,250.00
4 Semen warna Kg 0.194 14,000.00 2,716.00
JUMLAH HARGA BAHAN 123,591.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 287,841.00
E Overhead & Profit 15% x D 43,176.15
F Harga Satuan Pekerjaan (D+E) 331,017.15
4.4.3.54.a Pemasangan 1 m² dinding keramik 20 cm x 25 cm
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.900 105,000.00 94,500.00
2 Tukang batu L.02 OH 0.450 125,000.00 56,250.00
3 Kepala Tukang L.03 OH 0.045 145,000.00 6,525.00
4 Mandor L.04 OH 0.045 155,000.00 6,975.00
JUMLAH TENAGA KERJA 164,250.00
B BAHAN
1 Keramik 20 x 25 cm ex roman Bh 20.000 5,100.00 102,000.00
2 Semen portlan Kg 9.300 1,500.00 13,950.00
3 Pasir pasng m³ 0.018 125,000.00 2,250.00
4 Semen warna Kg 0.019 14,000.00 271.60
JUMLAH HARGA BAHAN 118,471.60
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 282,721.60
E Overhead & Profit 15% x D 42,408.24
F Harga Satuan Pekerjaan (D+E) 325,129.84

4.4.3.57 Pemasangan 1 m² dinding Batu Paras


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.700 105,000.00 73,500.00
2 Tukang batu L.02 OH 0.350 125,000.00 43,750.00
3 Kepala Tukang L.03 OH 0.035 145,000.00 5,075.00
4 Mandor L.04 OH 0.035 155,000.00 5,425.00
JUMLAH TENAGA KERJA 127,750.00
B BAHAN
1 Batu paras Bh 1.100 -
2 Semen portlan Kg 11.750 1,500.00 17,625.00
3 Pasir pasang m³ 0.035 125,000.00 4,375.00
JUMLAH HARGA BAHAN 22,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 27,425.00
E Overhead & Profit 15% x D 4,113.75
F Harga Satuan Pekerjaan (D+E) 31,538.75

4.4.3.58 Pemasangan 1 m² dinding batu tempel hitam


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.700 105,000.00 73,500.00
2 Tukang batu L.02 OH 0.350 125,000.00 43,750.00
3 Kepala Tukang L.03 OH 0.035 145,000.00 5,075.00
4 Mandor L.04 OH 0.035 155,000.00 5,425.00
JUMLAH TENAGA KERJA 127,750.00
B BAHAN
1 Batu tempel hitam Bh 1.100 -
2 Semen portlan Kg 11.750 1,500.00 17,625.00
3 Pasir pasang m³ 0.035 125,000.00 4,375.00
JUMLAH HARGA BAHAN 22,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 27,425.00
E Overhead & Profit 15% x D 4,113.75
F Harga Satuan Pekerjaan (D+E) 31,538.75

4.4.3.59 Pemasangan 1 m² lantai vynil ukuran 30cm x30cm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang batu L.02 OH 0.150 125,000.00 18,750.00
3 Kepala Tukang L.03 OH 0.015 145,000.00 2,175.00
4 Mandor L.04 OH 0.008 155,000.00 1,240.00
JUMLAH TENAGA KERJA 37,915.00
B BAHAN
1 Vynil Bh 11.870 6,200.00 73,594.00
2 Lem Kg 0.350 20,000.00 7,000.00
JUMLAH HARGA BAHAN 80,594.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 118,509.00


E Overhead & Profit 15% x D 17,776.35
F Harga Satuan Pekerjaan (D+E) 136,285.35

4.4.3.60 Pemasangan 1 m² wallpaper lebar 50cm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.350 105,000.00 36,750.00
2 Tukang batu L.02 OH 0.175 125,000.00 21,875.00
3 Kepala Tukang L.03 OH 0.017 145,000.00 2,465.00
4 Mandor L.04 OH 0.002 155,000.00 310.00
JUMLAH TENAGA KERJA 61,400.00
B BAHAN
1 Wallpaper Bh 2.200 60,000.00 132,000.00
2 Lem Kg 0.250 20,000.00 5,000.00
JUMLAH HARGA BAHAN 137,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 198,400.00


E Overhead & Profit 15% x D 29,760.00
F Harga Satuan Pekerjaan (D+E) 228,160.00

4.4.3.61 Pemasangan 1 m² floor harderner


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.120 105,000.00 12,600.00
2 Tukang batu L.02 OH 0.120 125,000.00 15,000.00
3 Kepala Tukang L.03 OH 0.012 145,000.00 1,740.00
4 Mandor L.04 OH 0.006 155,000.00 930.00
JUMLAH TENAGA KERJA 30,270.00
B BAHAN
1 Floor harderner Kg 5.000 16,600.00 83,000.00
JUMLAH HARGA BAHAN 83,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 113,270.00


E Overhead & Profit 15% x D 16,990.50
F Harga Satuan Pekerjaan (D+E) 130,260.50

4.4.3.62 Pemasangan 1 m² plint vynil 15cm x 30cm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.080 105,000.00 8,400.00
2 Tukang batu L.02 OH 0.080 125,000.00 10,000.00
3 Kepala Tukang L.03 OH 0.008 145,000.00 1,160.00
4 Mandor L.04 OH 0.004 155,000.00 620.00
JUMLAH TENAGA KERJA 20,180.00
B BAHAN
1 Vynil Bh 1.760 -
2 Lem Kg 0.080 20,000.00 1,600.00
JUMLAH HARGA BAHAN 1,600.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 21,780.00


E Overhead & Profit 15% x D 3,267.00
F Harga Satuan Pekerjaan (D+E) 25,047.00

4.4.3.63 Pemasangan 1 m² plint kayu tebal 2cm lebar 10cm


HARGA BIAYA
NO. URAIAN PEKERJAAN SATUAN KOEFISIEN
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.120 105,000.00 12,600.00
2 Tukang batu L.02 OH 0.120 125,000.00 15,000.00
3 Kepala Tukang L.03 OH 0.012 145,000.00 1,740.00
4 Mandor L.04 OH 0.006 155,000.00 930.00
JUMLAH TENAGA KERJA 30,270.00
B BAHAN
1 Papan kayu kelas 1 m³ 0.003 11,188,300.00 33,564.90
2 Paku/sekrup 5cm Kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 34,714.90
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 64,984.90


E Overhead & Profit 15% x D 9,747.74
F Harga Satuan Pekerjaan (D+E) 74,732.64
SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

A.4.5.1.5. Pemasangan 1 m² langit-langit tripleks ukuran (120 x 240) cm, tebal 3mm
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.100 105,000.00 10,500.00
2 Tukang kayu L,02 OH 0.100 125,000.00 12,500.00
3 Kepala Tukang L,03 OH 0.010 145,000.00 1,450.00
4 Mandor L,04 OH 0.005 155,000.00 775.00
JUMLAH TENAGA KERJA 25,225.00
B BAHAN
1 Tripleks (3 mm) lembar 0.375 70,000.00 26,250.00
2 Paku Tripleks kg 0.030 25,000.00 750.00
JUMLAH HARGA BAHAN 27,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 52,225.00


E Overhead & Profit 15% x D 7,833.75
F Harga Satuan Pekerjaan (D+E) 60,058.75

A.4.5.1.5.a. Pemasangan 1 m² langit-langit tripleks ukuran (120 x 240) cm, tebal 6 mm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.100 105,000.00 10,500.00
2 Tukang kayu L,02 OH 0.100 125,000.00 12,500.00
3 Kepala Tukang L,03 OH 0.010 145,000.00 1,450.00
4 Mandor L,04 OH 0.005 155,000.00 775.00
JUMLAH TENAGA KERJA 25,225.00
B BAHAN
1 Tripleks (6 mm) lembar 0.375 111,000.00 41,625.00
2 Paku Tripleks kg 0.030 25,000.00 750.00
JUMLAH HARGA BAHAN 42,375.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 67,600.00


E Overhead & Profit 15% x D 10,140.00
F Harga Satuan Pekerjaan (D+E) 77,740.00

A.4.5.1.6. Pemasangan 1 m² langit-langit lambrisering kayu, tebal 9mm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.800 105,000.00 84,000.00
2 Tukang kayu L,02 OH 0.800 125,000.00 100,000.00
3 Kepala Tukang L,03 OH 0.080 145,000.00 11,600.00
4 Mandor L,04 OH 0.040 155,000.00 6,200.00
JUMLAH TENAGA KERJA 201,800.00
B BAHAN
1 Kayu papan (Kelas I Ketam) m³ 0.015 11,188,300.00 167,824.50
2 Paku Tripleks kg 0.010 25,000.00 250.00
JUMLAH HARGA BAHAN 168,074.50
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 369,874.50


E Overhead & Profit 15% x D 55,481.18
F Harga Satuan Pekerjaan (D+E) 425,355.68

Pekerjaan Langit-Langit 73
A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.100 105,000.00 10,500.00
2 Tukang kayu L,02 OH 0.050 125,000.00 6,250.00
3 Kepala Tukang L,03 OH 0.005 145,000.00 725.00
4 Mandor L,04 OH 0.005 155,000.00 775.00
JUMLAH TENAGA KERJA 18,250.00
B BAHAN
1 Gypsum board lembar 0.364 74,600.00 27,154.40
2 Paku Skrup kg 0.110 60,000.00 6,600.00
JUMLAH HARGA BAHAN 33,754.40
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 52,004.40


E Overhead & Profit 15% x D 7,800.66
F Harga Satuan Pekerjaan (D+E) 59,805.06

A.4.5.1.7.a. Pemasangan 1 m2 langit-langit GRC (120x240x4) mm, tebal 4 mm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.100 105,000.00 10,500.00
2 Tukang kayu L,02 OH 0.050 125,000.00 6,250.00
3 Kepala Tukang L,03 OH 0.005 145,000.00 725.00
4 Mandor L,04 OH 0.005 155,000.00 775.00
JUMLAH TENAGA KERJA 18,250.00
B BAHAN
1 GRC Board (120 x 240 x 4) lembar 0.364 79,700.00 29,010.80
2 Paku GRC kg 0.110 25,000.00 2,750.00
JUMLAH HARGA BAHAN 31,760.80
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 50,010.80


E Overhead & Profit 15% x D 7,501.62
F Harga Satuan Pekerjaan (D+E) 57,512.42

A.4.5.1.9. Pemasangan 1 m’ list langit-langit kayu profil


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.050 105,000.00 5,250.00
2 Tukang kayu L,02 OH 0.050 125,000.00 6,250.00
3 Kepala Tukang L,03 OH 0.005 145,000.00 725.00
4 Mandor L,04 OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 12,690.00
B BAHAN
1 List kayu profil m 1.050 35,000.00 36,750.00
2 Paku (1"-5") kg 0.010 23,000.00 230.00
JUMLAH HARGA BAHAN 36,980.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 49,670.00


E Overhead & Profit 15% x D 7,450.50
F Harga Satuan Pekerjaan (D+E) 57,120.50

Pekerjaan Langit-Langit 74
A.4.5.2. SATUAN PEKERJAAN PENUTUP ATAP

A.4.5.2.32. Pemasangan 1 m2 genteng metal (ex prima) 0.30


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.200 105,000.00 21,000.00
2 Tukang kayu L.03 OH 0.100 125,000.00 12,500.00
3 Kepala Tukang L.11 OH 0.010 145,000.00 1,450.00
4 Mandor L.15 OH 0.001 155,000.00 155.00
JUMLAH TENAGA KERJA 35,105.00
B BAHAN
1 Genteng metal ex prima 0.30 bh 1.020 122,544.00 124,994.88
2 Paku biasa ½"-1" kg 0.200 23,000.00 4,600.00
JUMLAH HARGA BAHAN 129,594.88
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 164,699.88


E Overhead & Profit 15% x D 24,704.98
F Harga Satuan Pekerjaan (D+E) 189,404.86
catatan : harga bahan genteng metal ex prima dikali 1,84 lembar

A.4.5.2.32.a. Pemasangan 1 m2 genteng metal (ex royal) 0.30


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.200 105,000.00 21,000.00
2 Tukang kayu L.03 OH 0.100 125,000.00 12,500.00
3 Kepala Tukang L.11 OH 0.010 145,000.00 1,450.00
4 Mandor L.15 OH 0.001 155,000.00 155.00
JUMLAH TENAGA KERJA 35,105.00
B BAHAN
1 Genteng metal ex royal 0.30 Bh 1.020 113,886.00 116,163.72
2 Paku biasa ½"-1" Kg 0.200 23,000.00 4,600.00
JUMLAH HARGA BAHAN 120,763.72
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 155,868.72


E Overhead & Profit 15% x D 23,380.31
F Harga Satuan Pekerjaan (D+E) 179,249.03
catatan : harga bahan genteng metal ex royal dikali 1,71 lembar

A.4.5.2.32.b. Pemasangan 1 m2 genteng metal (ex royal) 0.25


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.200 105,000.00 21,000.00
2 Tukang kayu L.03 OH 0.100 125,000.00 12,500.00
3 Kepala Tukang L.11 OH 0.010 145,000.00 1,450.00
4 Mandor L.15 OH 0.001 155,000.00 155.00
JUMLAH TENAGA KERJA 35,105.00
B BAHAN
1 Genteng metal ex royal 0.25 Bh 1.020 88,578.00 90,349.56
2 Paku biasa ½"-1" Kg 0.200 23,000.00 4,600.00
JUMLAH HARGA BAHAN 94,949.56
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 130,054.56


E Overhead & Profit 15% x D 19,508.18
F Harga Satuan Pekerjaan (D+E) 149,562.74
catatan : harga bahan genteng metal ex royal dikali 1,71 lembar

A.4.5.2.32.c. Pemasangan 1 m2 genteng metal (ex clasic) 0.30


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.200 105,000.00 21,000.00
2 Tukang kayu L.03 OH 0.100 125,000.00 12,500.00
3 Kepala Tukang L.11 OH 0.010 145,000.00 1,450.00
4 Mandor L.15 OH 0.001 155,000.00 155.00
JUMLAH TENAGA KERJA 35,105.00
B BAHAN
1 Genteng metal ex clasic 0.30 Bh 1.020 107,892.00 110,049.84
2 Paku biasa ½"-1" Kg 0.200 23,000.00 4,600.00
JUMLAH HARGA BAHAN 114,649.84
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 149,754.84


E Overhead & Profit 15% x D 22,463.23
F Harga Satuan Pekerjaan (D+E) 172,218.07
catatan : harga bahan genteng metal ex classic dikali 1,62 lembar

A.4.5.2.32.d. Pemasangan 1 m2 genteng metal (ex clasic) 0.25


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.200 105,000.00 21,000.00
2 Tukang kayu L.03 OH 0.100 125,000.00 12,500.00
3 Kepala Tukang L.11 OH 0.010 145,000.00 1,450.00
4 Mandor L.15 OH 0.001 155,000.00 155.00
JUMLAH TENAGA KERJA 35,105.00
B BAHAN
1 Genteng metal ex clasic 0.25 Bh 1.020 83,916.00 85,594.32
2 Paku biasa ½"-1" Kg 0.200 23,000.00 4,600.00
JUMLAH HARGA BAHAN 90,194.32
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 125,299.32


E Overhead & Profit 15% x D 18,794.90
F Harga Satuan Pekerjaan (D+E) 144,094.22
catatan : harga bahan genteng metal ex classic dikali 1,62 lembar

A.4.5.2.32.e. Pemasangan 1 m2 genteng metal stone (ex prima) 0.35


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.200 105,000.00 21,000.00
2 Tukang kayu L.03 OH 0.100 125,000.00 12,500.00
3 Kepala Tukang L.11 OH 0.010 145,000.00 1,450.00
4 Mandor L.15 OH 0.001 155,000.00 155.00
JUMLAH TENAGA KERJA 35,105.00
B BAHAN
1 Genteng metal stone ex prima 0.35 Bh 1.020 147,200.00 150,144.00
2 Paku biasa ½"-1" Kg 0.200 23,000.00 4,600.00
JUMLAH HARGA BAHAN 154,744.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 189,849.00


E Overhead & Profit 15% x D 28,477.35
F Harga Satuan Pekerjaan (D+E) 218,326.35
catatan : harga bahan genteng metal stone ex prima dikali 1,84 lembar

A.4.5.2.32.f. Pemasangan 1 m2 genteng metal stone (ex classic) 0.35


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.200 105,000.00 21,000.00
2 Tukang kayu L.03 OH 0.100 125,000.00 12,500.00
3 Kepala Tukang L.11 OH 0.010 145,000.00 1,450.00
4 Mandor L.15 OH 0.001 155,000.00 155.00
JUMLAH TENAGA KERJA 35,105.00
B BAHAN
1 Genteng metal stone ex classic 0.35 Bh 1.020 129,600.00 132,192.00
2 Paku biasa ½"-1" Kg 0.200 23,000.00 4,600.00
JUMLAH HARGA BAHAN 136,792.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 171,897.00


E Overhead & Profit 15% x D 25,784.55
F Harga Satuan Pekerjaan (D+E) 197,681.55
catatan : harga bahan genteng metal stone ex classic dikali 1,62 lembar

A.4.5.2.33. Pemasangan 1 m2 atap sirap kayu


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.166 105,000.00 17,430.00
2 Tukang kayu L.03 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.11 OH 0.025 145,000.00 3,625.00
4 Mandor L.15 OH 0.008 155,000.00 1,240.00
JUMLAH TENAGA KERJA 53,545.00
B BAHAN
1 Sirap kayu (Belian) Bh 30.000 5,300.00 159,000.00
2 Paku biasa ½"-1" Kg 0.200 23,000.00 4,600.00
JUMLAH HARGA BAHAN 163,600.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 217,145.00


E Overhead & Profit 15% x D 32,571.75
F Harga Satuan Pekerjaan (D+E) 249,716.75

A.4.5.2.33.a. Pemasangan 1 m2 atap sirap kayu 6 x 40 x 0,3 cm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.166 105,000.00 17,430.00
2 Tukang kayu L.03 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.11 OH 0.025 145,000.00 3,625.00
4 Mandor L.15 OH 0.008 155,000.00 1,240.00
JUMLAH TENAGA KERJA 53,545.00
B BAHAN
1 Sirap kayu (Belian) 6x40x0,3 cm Bh 60.000 5,300.00 318,000.00
2 Paku biasa ½"-1" Kg 0.200 23,000.00 4,600.00
JUMLAH HARGA BAHAN 322,600.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 376,145.00


E Overhead & Profit 15% x D 56,421.75
F Harga Satuan Pekerjaan (D+E) 432,566.75

A.4.5.2.36. Pemasangan 1 m’ nok genteng metal kotak 0.35


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.250 105,000.00 26,250.00
2 Tukang kayu L.03 OH 0.150 125,000.00 18,750.00
3 Kepala Tukang L.11 OH 0.015 145,000.00 2,175.00
4 Mandor L.15 OH 0.013 155,000.00 2,015.00
JUMLAH TENAGA KERJA 49,190.00
B BAHAN
1 Nok genteng metal kotak 0.35 Bh 1.100 50,000.00 55,000.00
2 Paku biasa ½"-1" Kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 56,150.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 105,340.00


E Overhead & Profit 15% x D 15,801.00
F Harga Satuan Pekerjaan (D+E) 121,141.00

A.4.5.2.36.a. Pemasangan 1 m’ nok genteng metal stone kotak 0.35


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.250 105,000.00 26,250.00
2 Tukang kayu L.03 OH 0.150 125,000.00 18,750.00
3 Kepala Tukang L.11 OH 0.015 145,000.00 2,175.00
4 Mandor L.15 OH 0.013 155,000.00 2,015.00
JUMLAH TENAGA KERJA 49,190.00
B BAHAN
1 Nok genteng metal stone kotak 0.35 Bh 1.100 96,900.00 106,590.00
2 Paku biasa ½"-1" Kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 107,740.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 156,930.00


E Overhead & Profit 15% x D 23,539.50
F Harga Satuan Pekerjaan (D+E) 180,469.50

A.4.5.2.36.b. Pemasangan 1 m’ nok genteng metal 1/2 lingkaran 0.35 pjg. 40 cm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.250 105,000.00 26,250.00
2 Tukang kayu L.03 OH 0.150 125,000.00 18,750.00
3 Kepala Tukang L.11 OH 0.015 145,000.00 2,175.00
4 Mandor L.15 OH 0.013 155,000.00 2,015.00
JUMLAH TENAGA KERJA 49,190.00
B BAHAN
1 Nok genteng metal 1/2 lingkaran 0.35 pjg 40 cm Bh 1.100 138,000.00 151,800.00
2 Paku biasa ½"-1" Kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 152,950.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 202,140.00


E Overhead & Profit 15% x D 30,321.00
F Harga Satuan Pekerjaan (D+E) 232,461.00
Catatan : Harga satuan nok genteng metal 1/2 lingkaran dikali 3

A.4.5.2.36.c. Pemasangan 1 m’ nok genteng metal stone 1/2 lingkaran 0.35 pjg. 40 cm
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.250 105,000.00 26,250.00
2 Tukang kayu L.03 OH 0.150 125,000.00 18,750.00
3 Kepala Tukang L.11 OH 0.015 145,000.00 2,175.00
4 Mandor L.15 OH 0.013 155,000.00 2,015.00
JUMLAH TENAGA KERJA 49,190.00
B BAHAN
1 Nok genteng metal stone 1/2 lingkaran 0.35 pjg 40 cm Bh 1.100 225,000.00 247,500.00
2 Paku biasa ½"-1" Kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 248,650.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 297,840.00


E Overhead & Profit 15% x D 44,676.00
F Harga Satuan Pekerjaan (D+E) 342,516.00
Catatan : Harga satuan nok genteng metal stone 1/2 lingkaran dikali 3

A.4.5.2.38. Pemasangan 1 m2 atap seng gelombang BJLS 20


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.120 105,000.00 12,600.00
2 Tukang kayu L.03 OH 0.060 125,000.00 7,500.00
3 Kepala Tukang L.11 OH 0.006 145,000.00 870.00
4 Mandor L.15 OH 0.006 155,000.00 930.00
JUMLAH TENAGA KERJA 21,900.00
B BAHAN
1 Seng gelombang bjls 20 Lbr 0.700 55,000.00 38,500.00
2 Paku seng ½"-1" Kg 0.020 23,000.00 460.00
JUMLAH HARGA BAHAN 38,960.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 60,860.00


E Overhead & Profit 15% x D 9,129.00
F Harga Satuan Pekerjaan (D+E) 69,989.00

A.4.5.2.38.a. Pemasangan 1 m2 atap seng gelombang BJLS 30


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.120 105,000.00 12,600.00
2 Tukang kayu L.03 OH 0.060 125,000.00 7,500.00
3 Kepala Tukang L.11 OH 0.006 145,000.00 870.00
4 Mandor L.15 OH 0.006 155,000.00 930.00
JUMLAH TENAGA KERJA 21,900.00
B BAHAN
1 Seng gelombang bjls 30 Lbr 0.700 72,000.00 50,400.00
2 Paku seng ½"-1" Kg 0.020 23,000.00 460.00
JUMLAH HARGA BAHAN 50,860.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 72,760.00


E Overhead & Profit 15% x D 10,914.00
F Harga Satuan Pekerjaan (D+E) 83,674.00
A.4.5.2.39. Pemasangan 1 m’ nok atap seng BJLS 30
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang kayu L.03 OH 0.070 125,000.00 8,750.00
3 Kepala Tukang L.11 OH 0.007 145,000.00 1,015.00
4 Mandor L.15 OH 0.006 155,000.00 930.00
JUMLAH TENAGA KERJA 26,445.00
B BAHAN
1 Seng plat 3"x6" bjls.30 lebar 90 cm Lbr 0.300 72,000.00 21,600.00
2 Paku biasa ½"-1" Kg 0.040 23,000.00 920.00
JUMLAH HARGA BAHAN 22,520.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 48,965.00


E Overhead & Profit 15% x D 7,344.75
F Harga Satuan Pekerjaan (D+E) 56,309.75

A.4.5.2.39.a. Pemasangan 1 m’ nok atap seng BJLS 20


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang kayu L.03 OH 0.070 125,000.00 8,750.00
3 Kepala Tukang L.11 OH 0.007 145,000.00 1,015.00
4 Mandor L.15 OH 0.006 155,000.00 930.00
Jumlah JUMLAH TENAGA KERJA 26,445.00
B BAHAN
1 Seng plat 3"x6" bjls.20 lebar 90 cm Lbr 0.300 65,000.00 19,500.00
2 Paku biasa ½"-1" Kg 0.040 23,000.00 920.00
Jumlah JUMLAH HARGA BAHAN 20,420.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 46,865.00


E Overhead & Profit 15% x D 7,029.75
F Harga Satuan Pekerjaan (D+E) 53,894.75

A.4.5.2.40. Pemasangan 1 m2 atap alumunium


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang kayu L.03 OH 0.750 125,000.00 93,750.00
3 Kepala Tukang L.11 OH 0.080 145,000.00 11,600.00
4 Mandor L.15 OH 0.006 155,000.00 930.00
JUMLAH TENAGA KERJA 122,030.00
B BAHAN
1 Almn gel tbl 0,55 Lbr 1.050 - 0.00
2 Paku hak panj 15cm Kg 0.020 - 0.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 122,030.00


E Overhead & Profit 15% x D 18,304.50
F Harga Satuan Pekerjaan (D+E) 140,334.50

A.4.5.2.40.a. Pemasangan 1 m2 atap super sheet 0.35 (polos)


HARGA BIAYA
NO. URAIAN PEKERJAAN SATUAN KOEFISIEN
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang kayu L.03 OH 0.750 125,000.00 93,750.00
3 Kepala Tukang L.11 OH 0.080 145,000.00 11,600.00
4 Mandor L.15 OH 0.006 155,000.00 930.00
JUMLAH TENAGA KERJA 122,030.00
B BAHAN
1 Atap Metal Supersheet 0.35 (polos) M2 1.050 81,300.00 85,365.00
2 Screw Zincalume Bh 5.000 500.00 2,500.00
JUMLAH HARGA BAHAN 87,865.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 209,895.00


E Overhead & Profit 15% x D 31,484.25
F Harga Satuan Pekerjaan (D+E) 241,379.25

A.4.5.2.40.b. Pemasangan 1 m2 atap super sheet 0.35 (colour)


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang kayu L.03 OH 0.750 125,000.00 93,750.00
3 Kepala Tukang L.11 OH 0.080 145,000.00 11,600.00
4 Mandor L.15 OH 0.006 155,000.00 930.00
JUMLAH TENAGA KERJA 122,030.00
B BAHAN
1 Atap Metal Supersheet 0.35 (colour) M2 1.050 111,900.00 117,495.00
2 Screw Zincalume Bh 5.000 500.00 2,500.00
JUMLAH HARGA BAHAN 119,995.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 242,025.00


E Overhead & Profit 15% x D 36,303.75
F Harga Satuan Pekerjaan (D+E) 278,328.75

A.4.5.2.40.c. Pemasangan 1 m2 atap super sheet 0.25 (polos)


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang kayu L.03 OH 0.750 125,000.00 93,750.00
3 Kepala Tukang L.11 OH 0.080 145,000.00 11,600.00
4 Mandor L.15 OH 0.006 155,000.00 930.00
JUMLAH TENAGA KERJA 122,030.00
B BAHAN
1 Atap Metal Supersheet 0.25 (polos) M2 1.050 47,000.00 49,350.00
2 Screw Zincalume Bh 5.000 500.00 2,500.00
JUMLAH HARGA BAHAN 51,850.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 173,880.00


E Overhead & Profit 15% x D 26,082.00
F Harga Satuan Pekerjaan (D+E) 199,962.00

A.4.5.2.40.d. Pemasangan 1 m2 atap super sheet 0.25 (colour)


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang kayu L.03 OH 0.750 125,000.00 93,750.00
3 Kepala Tukang L.11 OH 0.080 145,000.00 11,600.00
4 Mandor L.15 OH 0.006 155,000.00 930.00
JUMLAH TENAGA KERJA 122,030.00
B BAHAN
1 Atap Metal Supersheet 0.25 (colour) M2 1.050 70,000.00 73,500.00
2 Screw Zincalume Bh 5.000 500.00 2,500.00
JUMLAH HARGA BAHAN 76,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 198,030.00


E Overhead & Profit 15% x D 29,704.50
F Harga Satuan Pekerjaan (D+E) 227,734.50

A.4.5.2.40.e. Pemasangan 1 m2 atap steel sheet 0.30 lurus (silver)


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang kayu L.03 OH 0.750 125,000.00 93,750.00
3 Kepala Tukang L.11 OH 0.080 145,000.00 11,600.00
4 Mandor L.15 OH 0.006 155,000.00 930.00
JUMLAH TENAGA KERJA 122,030.00
B BAHAN
1 Atap Steel Sheet 0.30 lurus (silver) M2 1.050 64,900.00 68,145.00
2 Screw Zincalume Bh 5.000 500.00 2,500.00
JUMLAH HARGA BAHAN 70,645.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 192,675.00


E Overhead & Profit 15% x D 28,901.25
F Harga Satuan Pekerjaan (D+E) 221,576.25
catatan : harga bahan atap steel sheet dikali 1,18 lembar

A.4.5.2.40.f. Pemasangan 1 m2 atap steel sheet 0.35 lurus (silver)


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang kayu L.03 OH 0.750 125,000.00 93,750.00
3 Kepala Tukang L.11 OH 0.080 145,000.00 11,600.00
4 Mandor L.15 OH 0.006 155,000.00 930.00
JUMLAH TENAGA KERJA 122,030.00
B BAHAN
1 Atap Steel Sheet 0.35 lurus (silver) M2 1.050 70,800.00 74,340.00
2 Screw Zincalume Bh 5.000 500.00 2,500.00
JUMLAH HARGA BAHAN 76,840.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 198,870.00


E Overhead & Profit 15% x D 29,830.50
F Harga Satuan Pekerjaan (D+E) 228,700.50
catatan : harga bahan atap steel sheet dikali 1,18 lembar

A.4.5.2.40.g. Pemasangan 1 m2 atap steel sheet 0.40 lurus (silver)


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang kayu L.03 OH 0.750 125,000.00 93,750.00
3 Kepala Tukang L.11 OH 0.080 145,000.00 11,600.00
4 Mandor L.15 OH 0.006 155,000.00 930.00
JUMLAH TENAGA KERJA 122,030.00
B BAHAN
1 Atap Steel Sheet 0.40 lurus (silver) M2 1.050 76,700.00 80,535.00
2 Screw Zincalume Bh 5.000 500.00 2,500.00
JUMLAH HARGA BAHAN 83,035.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 205,065.00


E Overhead & Profit 15% x D 30,759.75
F Harga Satuan Pekerjaan (D+E) 235,824.75
catatan : harga bahan atap steel sheet dikali 1,18 lembar

A.4.5.2.40.h. Pemasangan 1 m2 atap steel sheet 0.25 lurus (biru, merah, hijau tua)
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang kayu L.03 OH 0.750 125,000.00 93,750.00
3 Kepala Tukang L.11 OH 0.080 145,000.00 11,600.00
4 Mandor L.15 OH 0.006 155,000.00 930.00
JUMLAH TENAGA KERJA 122,030.00
B BAHAN
1 Atap Steel Sheet 0.25 lurus (biru, merah, hijau tua) M2 1.050 59,000.00 61,950.00
2 Screw Zincalume Bh 5.000 500.00 2,500.00
JUMLAH HARGA BAHAN 64,450.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 186,480.00


E Overhead & Profit 15% x D 27,972.00
F Harga Satuan Pekerjaan (D+E) 214,452.00
catatan : harga bahan atap steel sheet dikali 1,18 lembar

A.4.5.2.40.i. Pemasangan 1 m2 atap steel sheet 0.25 lurus (biru, merah, coklat, hijau tua, biru tua)
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang kayu L.03 OH 0.750 125,000.00 93,750.00
3 Kepala Tukang L.11 OH 0.080 145,000.00 11,600.00
4 Mandor L.15 OH 0.006 155,000.00 930.00
JUMLAH TENAGA KERJA 122,030.00
B BAHAN
1 Atap Steel Sheet 0.25 lurus (warna) M2 1.050 59,000.00 61,950.00
2 Screw Zincalume Bh 5.000 500.00 2,500.00
JUMLAH HARGA BAHAN 64,450.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 186,480.00


E Overhead & Profit 15% x D 27,972.00
F Harga Satuan Pekerjaan (D+E) 214,452.00
catatan : harga bahan atap steel sheet dikali 1,18 lembar

A.4.5.2.40.j. Pemasangan 1 m2 atap steel sheet 0.35 lurus (coklat, biru, merah, hijau muda)
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang kayu L.03 OH 0.750 125,000.00 93,750.00
3 Kepala Tukang L.11 OH 0.080 145,000.00 11,600.00
4 Mandor L.15 OH 0.006 155,000.00 930.00
JUMLAH TENAGA KERJA 122,030.00
B BAHAN
1 Atap Steel Sheet 0.35 lurus (coklat, biru, merah, hijau muda) M2 1.050 79,060.00 83,013.00
2 Screw Zincalume Bh 5.000 500.00 2,500.00
JUMLAH HARGA BAHAN 85,513.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 207,543.00


E Overhead & Profit 15% x D 31,131.45
F Harga Satuan Pekerjaan (D+E) 238,674.45
catatan : harga bahan atap steel sheet dikali 1,18 lembar

A.4.5.2.40.k. Pemasangan 1 m2 atap steel sheet 0.4 lurus (biru)


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang kayu L.03 OH 0.750 125,000.00 93,750.00
3 Kepala Tukang L.11 OH 0.080 145,000.00 11,600.00
4 Mandor L.15 OH 0.006 155,000.00 930.00
JUMLAH TENAGA KERJA 122,030.00
B BAHAN
1 Atap Steel Sheet 0.4 lurus (biru) M2 1.050 84,960.00 89,208.00
2 Screw Zincalume Bh 5.000 500.00 2,500.00
JUMLAH HARGA BAHAN 91,708.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 213,738.00


E Overhead & Profit 15% x D 32,060.70
F Harga Satuan Pekerjaan (D+E) 245,798.70
catatan : harga bahan atap steel sheet dikali 1,18 lembar

A.4.5.2.40.l. Pemasangan 1 m2 atap steel sheet 0.45 lurus (biru, merah, hijau muda)
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang kayu L.03 OH 0.750 125,000.00 93,750.00
3 Kepala Tukang L.11 OH 0.080 145,000.00 11,600.00
4 Mandor L.15 OH 0.006 155,000.00 930.00
JUMLAH TENAGA KERJA 122,030.00
B BAHAN
1 Atap Steel Sheet 0.45 lurus (biru, merah, hijau muda) M2 1.050 90,860.00 95,403.00
2 Screw Zincalume Bh 5.000 500.00 2,500.00
JUMLAH HARGA BAHAN 97,903.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 219,933.00


E Overhead & Profit 15% x D 32,989.95
F Harga Satuan Pekerjaan (D+E) 252,922.95
catatan : harga bahan atap steel sheet dikali 1,18 lembar

A.4.5.2.40.m. Pemasangan 1 m2 atap steel sheet 0.3 lengkung (silver)


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang kayu L.03 OH 0.750 125,000.00 93,750.00
3 Kepala Tukang L.11 OH 0.080 145,000.00 11,600.00
4 Mandor L.15 OH 0.006 155,000.00 930.00
JUMLAH TENAGA KERJA 122,030.00
B BAHAN
1 Atap Steel Sheet 0.3 lengkung (silver) M2 1.050 71,390.00 74,959.50
2 Screw Zincalume Bh 5.000 500.00 2,500.00
JUMLAH HARGA BAHAN 77,459.50
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 199,489.50


E Overhead & Profit 15% x D 29,923.43
F Harga Satuan Pekerjaan (D+E) 229,412.93
catatan : harga bahan atap steel sheet dikali 1,18 lembar

A.4.5.2.40.n. Pemasangan 1 m2 atap steel sheet 0.35 lengkung (silver)


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang kayu L.03 OH 0.750 125,000.00 93,750.00
3 Kepala Tukang L.11 OH 0.080 145,000.00 11,600.00
4 Mandor L.15 OH 0.006 155,000.00 930.00
JUMLAH TENAGA KERJA 122,030.00
B BAHAN
1 Atap Steel Sheet 0.35 lengkung (silver) M2 1.050 77,880.00 81,774.00
2 Screw Zincalume Bh 5.000 500.00 2,500.00
JUMLAH HARGA BAHAN 84,274.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 206,304.00


E Overhead & Profit 15% x D 30,945.60
F Harga Satuan Pekerjaan (D+E) 237,249.60
catatan : harga bahan atap steel sheet dikali 1,18 lembar

A.4.5.2.40.o. Pemasangan 1 m2 atap steel sheet 0.4 lengkung (silver)


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang kayu L.03 OH 0.750 125,000.00 93,750.00
3 Kepala Tukang L.11 OH 0.080 145,000.00 11,600.00
4 Mandor L.15 OH 0.006 155,000.00 930.00
JUMLAH TENAGA KERJA 122,030.00
B BAHAN
1 Atap Steel Sheet 0.4 lengkung (silver) M2 1.050 84,370.00 88,588.50
2 Screw Zincalume Bh 5.000 500.00 2,500.00
JUMLAH HARGA BAHAN 91,088.50
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 213,118.50


E Overhead & Profit 15% x D 31,967.78
F Harga Satuan Pekerjaan (D+E) 245,086.28
catatan : harga bahan atap steel sheet dikali 1,18 lembar

A.4.5.2.40.p. Pemasangan 1 m2 atap steel sheet 0.3 lengkung (biru, merah, coklat, hijau tua, biru tua)
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
NO. URAIAN PEKERJAAN SATUAN KOEFISIEN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang kayu L.03 OH 0.750 125,000.00 93,750.00
3 Kepala Tukang L.11 OH 0.080 145,000.00 11,600.00
4 Mandor L.15 OH 0.006 155,000.00 930.00
JUMLAH TENAGA KERJA 122,030.00
B BAHAN
1 Atap Steel Sheet 0.3 lengkung (biru, merah, coklat, hijau tua, biru tua) M2 1.050 73,986.00 77,685.30
2 Screw Zincalume Bh 5.000 500.00 2,500.00
JUMLAH HARGA BAHAN 80,185.30
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 202,215.30


E Overhead & Profit 15% x D 30,332.30
F Harga Satuan Pekerjaan (D+E) 232,547.60
catatan : harga bahan atap steel sheet dikali 1,18 lembar

A.4.5.2.40.q. Pemasangan 1 m2 atap steel sheet 0.35 lengkung (coklat, biru, merah, hijau muda)
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang kayu L.03 OH 0.750 125,000.00 93,750.00
3 Kepala Tukang L.11 OH 0.080 145,000.00 11,600.00
4 Mandor L.15 OH 0.006 155,000.00 930.00
JUMLAH TENAGA KERJA 122,030.00
B BAHAN
1 Atap Steel Sheet 0.35 lengkung (coklat, biru, merah, hijau muda) M2 1.050 86,966.00 91,314.30
2 Screw Zincalume Bh 5.000 500.00 2,500.00
JUMLAH HARGA BAHAN 93,814.30
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 215,844.30


E Overhead & Profit 15% x D 32,376.65
F Harga Satuan Pekerjaan (D+E) 248,220.95
catatan : harga bahan atap steel sheet dikali 1,18 lembar

A.4.5.2.40.r. Pemasangan 1 m2 atap steel sheet 0.4 lengkung (biru)


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang kayu L.03 OH 0.750 125,000.00 93,750.00
3 Kepala Tukang L.11 OH 0.080 145,000.00 11,600.00
4 Mandor L.15 OH 0.006 155,000.00 930.00
JUMLAH TENAGA KERJA 122,030.00
B BAHAN
1 Atap Steel Sheet 0.4 lengkung (biru) M2 1.050 93,456.00 98,128.80
2 Screw Zincalume Bh 5.000 500.00 2,500.00
JUMLAH HARGA BAHAN 100,628.80
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 222,658.80


E Overhead & Profit 15% x D 33,398.82
F Harga Satuan Pekerjaan (D+E) 256,057.62
catatan : harga bahan atap steel sheet dikali 1,18 lembar

A.4.5.2.40.s. Pemasangan 1 m2 atap steel sheet 0.45 lengkung (biru, merah, hijau muda)
HARGA BIAYA
NO. URAIAN PEKERJAAN SATUAN KOEFISIEN
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang kayu L.03 OH 0.750 125,000.00 93,750.00
3 Kepala Tukang L.11 OH 0.080 145,000.00 11,600.00
4 Mandor L.15 OH 0.006 155,000.00 930.00
JUMLAH TENAGA KERJA 122,030.00
B BAHAN
1 Atap Steel Sheet 0.45 lengkung (biru, merah, hijau muda) M2 1.050 99,946.00 104,943.30
2 Screw Zincalume Bh 5.000 500.00 2,500.00
JUMLAH HARGA BAHAN 107,443.30
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 229,473.30


E Overhead & Profit 15% x D 34,421.00
F Harga Satuan Pekerjaan (D+E) 263,894.30
catatan : harga bahan atap steel sheet dikali 1,18 lembar

A.4.5.2.42. Pemasangan 1 m2 alumunium foil/sisalation


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang kayu L.03 OH 0.050 125,000.00 6,250.00
3 Kepala Tukang L.11 OH 0.005 145,000.00 725.00
4 Mandor L.15 OH 0.008 155,000.00 1,240.00
JUMLAH TENAGA KERJA 23,965.00
B BAHAN
1 Alumunium foil M2 1.050 55,000.00 57,750.00
JUMLAH HARGA BAHAN 57,750.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 81,715.00


E Overhead & Profit 15% x D 12,257.25
F Harga Satuan Pekerjaan (D+E) 93,972.25
SATUAN PEKERJAAN KAYU

A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 7.000 105,000.00 735,000.00
2 Tukang kayu L.03 OH 21.000 125,000.00 2,625,000.00
3 Kepala Tukang L.11 OH 2.100 145,000.00 304,500.00
4 Mandor L.15 OH 0.350 155,000.00 54,250.00
JUMLAH TENAGA KERJA 3,718,750.00
B BAHAN
1 Balok Kayu (Bengkirai 5/10 Ketam untuk kusen) m3 1.100 80,000.00 88,000.00
2 Paku 10 cm Kg 1.250 23,000.00 28,750.00
3 Lem kayu Kg 1.000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 136,750.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 3,855,500.00


E Overhead & Profit 15% x D 578,325.00
F Harga Satuan Pekerjaan (D+E) 4,433,825.00

A.4.6.1.1.a. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu belian
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 7.000 105,000.00 735,000.00
2 Tukang kayu L.03 OH 21.000 125,000.00 2,625,000.00
3 Kepala Tukang L.11 OH 2.100 145,000.00 304,500.00
4 Mandor L.15 OH 0.350 155,000.00 54,250.00
JUMLAH TENAGA KERJA 3,718,750.00
B BAHAN
1 Kayu belian Ketam m3 1.100 120,000.00 132,000.00
2 Paku 10 cm Kg 1.250 23,000.00 28,750.00
3 Lem kayu Kg 1.000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 180,750.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 3,899,500.00


E Overhead & Profit 15% x D 584,925.00
F Harga Satuan Pekerjaan (D+E) 4,484,425.00

A.4.6.1.2.b. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 6.000 105,000.00 630,000.00
2 Tukang kayu L.03 OH 18.000 125,000.00 2,250,000.00
3 Kepala Tukang L.03 OH 1.800 145,000.00 261,000.00
4 Mandor L.04 OH 0.300 155,000.00 46,500.00
JUMLAH TENAGA KERJA 3,187,500.00
B BAHAN
1 Balok Kayu (Ky. klas II Mabang uk. 5/10 ( tdk ketam ) m3 1.200 65,000.00 78,000.00
2 Paku 10 cm Kg 1.250 23,000.00 28,750.00
3 Lem kayu Kg 1.000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 126,750.00
C PERALATAN

JUMLAH HARGA ALAT

Pekerjaan Kayu 88
D Jumlah (A+B+C) 3,314,250.00
E Overhead & Profit 15% x D 497,137.50
F Harga Satuan Pekerjaan (D+E) 3,811,387.50

A.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.350 105,000.00 36,750.00
2 Tukang kayu L.03 OH 1.050 125,000.00 131,250.00
3 Kepala Tukang L.03 OH 0.105 145,000.00 15,225.00
4 Mandor L.04 OH 0.018 155,000.00 2,790.00
JUMLAH TENAGA KERJA 186,015.00
B BAHAN
1 Papan kayu (Papan kayu klas II (mabang) tdk ketam m3 0.040 8,300,000.00 332,000.00
2 Paku 5-7 cm Kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 333,150.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 519,165.00


E Overhead & Profit 15% x D 77,874.75
F Harga Satuan Pekerjaan (D+E) 597,039.75

A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.350 105,000.00 36,750.00
2 Tukang kayu L.03 OH 1.050 125,000.00 131,250.00
3 Kepala Tukang L.03 OH 0.105 145,000.00 15,225.00
4 Mandor L.04 OH 0.018 155,000.00 2,790.00
JUMLAH TENAGA KERJA 186,015.00
B BAHAN
1 Papan kayu klas III m3 0.040 2,558,000.00 102,320.00
2 Paku 5-7 cm Kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 103,470.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 289,485.00


E Overhead & Profit 15% x D 43,422.75
F Harga Satuan Pekerjaan (D+E) 332,907.75

A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang kayu L.03 OH 3.000 125,000.00 375,000.00
3 Kepala Tukang L.03 OH 0.300 145,000.00 43,500.00
4 Mandor L.04 OH 0.050 155,000.00 7,750.00
JUMLAH TENAGA KERJA 531,250.00
B BAHAN
1 Papan kayu (Papan kayu klas I (ketam) m3 0.040 11,188,300.00 447,532.00
2 Lem kayu Kg 0.500 20,000.00 10,000.00
JUMLAH HARGA BAHAN 457,532.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 988,782.00


E Overhead & Profit 15% x D 148,317.30

Pekerjaan Kayu 89
F Harga Satuan Pekerjaan (D+E) 1,137,099.30

A.4.6.1.5.a. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu belian


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang kayu L.03 OH 3.000 125,000.00 375,000.00
3 Kepala Tukang L.03 OH 0.300 145,000.00 43,500.00
4 Mandor L.04 OH 0.050 155,000.00 7,750.00
JUMLAH TENAGA KERJA 531,250.00
B BAHAN
1 Papan kayu (Papan belian (ketam) m3 0.040 14,814,000.00 592,560.00
2 Lem kayu Kg 0.500 20,000.00 10,000.00
JUMLAH HARGA BAHAN 602,560.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,133,810.00


E Overhead & Profit 15% x D 170,071.50
F Harga Satuan Pekerjaan (D+E) 1,303,881.50

A.4.6.1.5.b. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas II


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang kayu L.03 OH 3.000 125,000.00 375,000.00
3 Kepala Tukang L.03 OH 0.300 145,000.00 43,500.00
4 Mandor L.04 OH 0.050 155,000.00 7,750.00
JUMLAH TENAGA KERJA 531,250.00
B BAHAN
1 Papan kayu (Papan kayu klas II (mabang) ketam) m3 0.040 8,300,000.00 332,000.00
2 Lem kayu Kg 0.500 20,000.00 10,000.00
JUMLAH HARGA BAHAN 342,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 873,250.00


E Overhead & Profit 15% x D 130,987.50
F Harga Satuan Pekerjaan (D+E) 1,004,237.50

A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.800 105,000.00 84,000.00
2 Tukang kayu L.03 OH 2.400 125,000.00 300,000.00
3 Kepala Tukang L.03 OH 0.240 145,000.00 34,800.00
4 Mandor L.04 OH 0.040 155,000.00 6,200.00
JUMLAH TENAGA KERJA 425,000.00
B BAHAN
1 Papan kayu (Papan kayu klas I (ketam) m3 0.040 11,188,300.00 447,532.00
2 Lem kayu Kg 0.300 20,000.00 6,000.00
JUMLAH HARGA BAHAN 453,532.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 878,532.00


E Overhead & Profit 15% x D 131,779.80
F Harga Satuan Pekerjaan (D+E) 1,010,311.80

Pekerjaan Kayu 90
A.4.6.1.6.a. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu belian
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.800 105,000.00 84,000.00
2 Tukang kayu L.03 OH 2.400 125,000.00 300,000.00
3 Kepala Tukang L.03 OH 0.240 145,000.00 34,800.00
4 Mandor L.04 OH 0.040 155,000.00 6,200.00
JUMLAH TENAGA KERJA 425,000.00
B BAHAN
1 Papan kayu (Papan belian ketam) m3 0.024 14,814,000.00 355,536.00
2 Lem kayu Kg 0.300 20,000.00 6,000.00
JUMLAH HARGA BAHAN 361,536.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 786,536.00


E Overhead & Profit 15% x D 117,980.40
F Harga Satuan Pekerjaan (D+E) 904,516.40

A.4.6.1.6.b. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas II
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.800 105,000.00 84,000.00
2 Tukang kayu L.03 OH 2.400 125,000.00 300,000.00
3 Kepala Tukang L.03 OH 0.240 145,000.00 34,800.00
4 Mandor L.04 OH 0.040 155,000.00 6,200.00
JUMLAH TENAGA KERJA 425,000.00
B BAHAN
1 Papan kayu (Papan kayu klas II (mabang) ketam) m3 0.024 8,300,000.00 199,200.00
2 Lem kayu Kg 0.300 20,000.00 6,000.00
JUMLAH HARGA BAHAN 205,200.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 630,200.00


E Overhead & Profit 15% x D 94,530.00
F Harga Satuan Pekerjaan (D+E) 724,730.00

A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang kayu L.03 OH 3.000 125,000.00 375,000.00
3 Kepala Tukang L.03 OH 0.300 145,000.00 43,500.00
4 Mandor L.04 OH 0.050 155,000.00 7,750.00
JUMLAH TENAGA KERJA 531,250.00
B BAHAN
1 Papan kayu (Papan kayu klas I (ketam) m3 0.064 11,188,300.00 716,051.20
2 Lem kayu Kg 0.500 20,000.00 10,000.00
JUMLAH HARGA BAHAN 726,051.20
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,257,301.20


E Overhead & Profit 15% x D 188,595.18
F Harga Satuan Pekerjaan (D+E) 1,445,896.38

A.4.6.1.7.a. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu belian
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )

Pekerjaan Kayu 91
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang kayu L.03 OH 3.000 125,000.00 375,000.00
3 Kepala Tukang L.03 OH 0.300 145,000.00 43,500.00
4 Mandor L.04 OH 0.050 155,000.00 7,750.00
JUMLAH TENAGA KERJA 531,250.00
B BAHAN
1 Papan kayu (Papan belian ketam) m3 0.064 14,814,000.00 948,096.00
2 Lem kayu Kg 0.500 20,000.00 10,000.00
JUMLAH HARGA BAHAN 958,096.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,489,346.00


E Overhead & Profit 15% x D 223,401.90
F Harga Satuan Pekerjaan (D+E) 1,712,747.90

A.4.6.1.7.b. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas II
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang kayu L.03 OH 3.000 125,000.00 375,000.00
3 Kepala Tukang L.03 OH 0.300 145,000.00 43,500.00
4 Mandor L.04 OH 0.050 155,000.00 7,750.00
JUMLAH TENAGA KERJA 531,250.00
B BAHAN
1 Papan kayu (Papan kayu klas II (mabang) ketam) m3 0.064 8,300,000.00 531,200.00
2 Lem kayu Kg 0.500 20,000.00 10,000.00
JUMLAH HARGA BAHAN 541,200.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,072,450.00


E Overhead & Profit 15% x D 160,867.50
F Harga Satuan Pekerjaan (D+E) 1,233,317.50

A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm)
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.700 105,000.00 73,500.00
2 Tukang kayu L.03 OH 2.100 125,000.00 262,500.00
3 Kepala Tukang L.03 OH 0.210 145,000.00 30,450.00
4 Mandor L.04 OH 0.035 155,000.00 5,425.00
JUMLAH TENAGA KERJA 371,875.00
B BAHAN
1 Papan kayu (Papan kayu klas II (mabang) ketam) m3 0.025 8,300,000.00 207,500.00
2 Paku 1 cm- 2,5 cm Kg 0.030 23,000.00 690.00
3 Lem kayu Kg 0.500 20,000.00 10,000.00
4 Plywood tebal 6 mm ukuran (90 x 220) cm Lembar 1.000 120,000.00 120,000.00
JUMLAH HARGA BAHAN 338,190.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 710,065.00


E Overhead & Profit 15% x D 106,509.75
F Harga Satuan Pekerjaan (D+E) 816,574.75

A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7

Pekerjaan Kayu 92
A TENAGA
1 Pekerja L.01 OH 0.800 105,000.00 84,000.00
2 Tukang kayu L.03 OH 2.400 125,000.00 300,000.00
3 Kepala Tukang L.03 OH 0.240 145,000.00 34,800.00
4 Mandor L.04 OH 0.040 155,000.00 6,200.00
JUMLAH TENAGA KERJA 425,000.00
B BAHAN
1 Papan kayu (Papan kayu klas I (ketam) m3 0.0256 11,188,300.00 286,420.48
2 Paku 1 cm- 2,5 cm Kg 0.030 23,000.00 690.00
3 Lem kayu Kg 0.500 20,000.00 10,000.00
4 Plywood tebal 6 mm ukuran (90 x 220) cm Lembar 1.000 120,000.00 120,000.00
JUMLAH HARGA BAHAN 417,110.48
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 842,110.48


E Overhead & Profit 15% x D 126,316.57
F Harga Satuan Pekerjaan (D+E) 968,427.05

A.4.6.1.9.a. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas II


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.800 105,000.00 84,000.00
2 Tukang kayu L.03 OH 2.400 125,000.00 300,000.00
3 Kepala Tukang L.03 OH 0.240 145,000.00 34,800.00
4 Mandor L.04 OH 0.040 155,000.00 6,200.00
JUMLAH TENAGA KERJA 425,000.00
B BAHAN
1 Papan kayu (Papan kayu klas II (mabang) ketam) m3 0.0256 8,300,000.00 212,480.00
2 Paku 1 cm- 2,5 cm Kg 0.030 23,000.00 690.00
3 Lem kayu Kg 0.500 20,000.00 10,000.00
4 Plywood tebal 6 mm ukuran (90 x 220) cm Lembar 1.000 120,000.00 120,000.00
JUMLAH HARGA BAHAN 343,170.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 768,170.00


E Overhead & Profit 15% x D 115,225.50
F Harga Satuan Pekerjaan (D+E) 883,395.50

A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas I


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.670 105,000.00 70,350.00
2 Tukang kayu L.03 OH 2.000 125,000.00 250,000.00
3 Kepala Tukang L.03 OH 0.200 145,000.00 29,000.00
4 Mandor L.04 OH 0.335 155,000.00 51,925.00
JUMLAH TENAGA KERJA 401,275.00
B BAHAN
1 Papan kayu (Papan kayu klas I (ketam) m3 0.060 11,188,300.00 671,298.00
2 Paku 1 cm- 2,5 cm Kg 0.150 23,000.00 3,450.00
JUMLAH HARGA BAHAN 674,748.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,076,023.00


E Overhead & Profit 15% x D 161,403.45
F Harga Satuan Pekerjaan (D+E) 1,237,426.45

A.4.6.1.10.a. Pemasangan 1 m2 jalusi kusen, kayu kelas II


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7

Pekerjaan Kayu 93
A TENAGA
1 Pekerja L.01 OH 0.670 105,000.00 70,350.00
2 Tukang kayu L.03 OH 2.000 125,000.00 250,000.00
3 Kepala Tukang L.03 OH 0.200 145,000.00 29,000.00
4 Mandor L.04 OH 0.335 155,000.00 51,925.00
JUMLAH TENAGA KERJA 401,275.00
B BAHAN
1 Papan kayu (Papan kayu klas II (mabang) ketam) m3 0.060 8,300,000.00 498,000.00
2 Paku 1 cm- 2,5 cm Kg 0.150 23,000.00 3,450.00
JUMLAH HARGA BAHAN 501,450.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 902,725.00


E Overhead & Profit 15% x D 135,408.75
F Harga Satuan Pekerjaan (D+E) 1,038,133.75

A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas II bentang 6 meter


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 4.000 105,000.00 420,000.00
2 Tukang kayu L.03 OH 12.000 125,000.00 1,500,000.00
3 Kepala Tukang L.03 OH 1.200 145,000.00 174,000.00
4 Mandor L.04 OH 0.200 155,000.00 31,000.00
JUMLAH TENAGA KERJA 2,125,000.00
B BAHAN
1 Balok kayu (Ky. klas II Mabang uk. 6/12 - 4 M ( tdk ketam ) m3 1.100 4,224,000.00 4,646,400.00
2 Besi strip tebal 5 mm Kg 15.000 17,000.00 255,000.00
3 Paku 12 cm Kg 5.600 23,000.00 128,800.00
JUMLAH HARGA BAHAN 5,030,200.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 7,155,200.00


E Overhead & Profit 15% x D 1,073,280.00
F Harga Satuan Pekerjaan (D+E) 8,228,480.00

A.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 6.700 105,000.00 703,500.00
2 Tukang kayu L.03 OH 21.100 125,000.00 2,637,500.00
3 Kepala Tukang L.03 OH 2.010 145,000.00 291,450.00
4 Mandor L.04 OH 0.335 155,000.00 51,925.00
JUMLAH TENAGA KERJA 3,684,375.00
B BAHAN
1 Ky. klas I Bengkirai uk. 5/10 - 4 M ( ketam ) m3 1.200 9,050,000.00 10,860,000.00
2 Besi strip tebal 5 mm Kg 15.000 17,000.00 255,000.00
3 Paku 12 cm Kg 5.600 23,000.00 128,800.00
JUMLAH HARGA BAHAN 11,243,800.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 14,928,175.00


E Overhead & Profit 15% x D 2,239,226.25
F Harga Satuan Pekerjaan (D+E) 17,167,401.25

Pekerjaan Kayu 94
A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 6.700 105,000.00 703,500.00
2 Tukang kayu L.03 OH 21.100 125,000.00 2,637,500.00
3 Kepala Tukang L.03 OH 2.010 145,000.00 291,450.00
4 Mandor L.04 OH 0.335 155,000.00 51,925.00
JUMLAH TENAGA KERJA 3,684,375.00
B BAHAN
1 Balok kayu (Ky. klas II Mabang uk. 5/10 - 4 M ( tdk ketam )) m3 1.100 3,355,000.00 3,690,500.00
2 Besi strip tebal 5 mm Kg 15.000 17,000.00 255,000.00
3 Paku 12 cm Kg 3.000 23,000.00 69,000.00
JUMLAH HARGA BAHAN 4,014,500.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 7,698,875.00


E Overhead & Profit 15% x D 1,154,831.25
F Harga Satuan Pekerjaan (D+E) 8,853,706.25

A.4.6.1.18. Pemasangan 1 m2 rangka atap sirap, kayu kelas II


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.120 105,000.00 12,600.00
2 Tukang kayu L.03 OH 0.120 125,000.00 15,000.00
3 Kepala Tukang L.03 OH 0.012 145,000.00 1,740.00
4 Mandor L.04 OH 0.006 155,000.00 930.00
JUMLAH TENAGA KERJA 30,270.00
B BAHAN
1 Kayu kelas II (Ky. klas II Mabang uk. 4/6 - 4 M ( tdk ketam ) m3 0.014 5,070,000.00 70,980.00
2 Paku 5 - 10 cm Kg 0.057 23,000.00 1,311.00
JUMLAH HARGA BAHAN 72,291.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 102,561.00


E Overhead & Profit 15% x D 15,384.15
F Harga Satuan Pekerjaan (D+E) 117,945.15

A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang kayu L.03 OH 0.300 125,000.00 37,500.00
3 Kepala Tukang L.03 OH 0.030 145,000.00 4,350.00
4 Mandor L.04 OH 0.075 155,000.00 11,625.00
JUMLAH TENAGA KERJA 69,225.00
B BAHAN
1 Kaso-kaso 5 x 7 cm (Ky. klas II Mabang uk. 5/7 - 4 M ( tdk ketam m3 0.015 4,755,000.00 73,227.00
2 Paku 7 - 10 cm Kg 0.200 23,000.00 4,600.00
JUMLAH HARGA BAHAN 77,827.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 147,052.00


E Overhead & Profit 15% x D 22,057.80
F Harga Satuan Pekerjaan (D+E) 169,109.80

Pekerjaan Kayu 95
A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.200 105,000.00 21,000.00
2 Tukang kayu L.03 OH 0.300 125,000.00 37,500.00
3 Kepala Tukang L.03 OH 0.030 145,000.00 4,350.00
4 Mandor L.04 OH 0.010 155,000.00 1,550.00
JUMLAH TENAGA KERJA 64,400.00
B BAHAN
1 Kaso-kaso 5 x 7 cm (Ky. klas II Mabang uk. 5/7 - 4 M ( tdk ketam m3 0.0163 4,755,000.00 77,506.50
2 Paku 7 - 10 cm Kg 0.250 23,000.00 5,750.00
JUMLAH HARGA BAHAN 83,256.50
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 147,656.50


E Overhead & Profit 15% x D 22,148.48
F Harga Satuan Pekerjaan (D+E) 169,804.98

A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.100 105,000.00 10,500.00
2 Tukang kayu L.03 OH 0.200 125,000.00 25,000.00
3 Kepala Tukang L.03 OH 0.020 145,000.00 2,900.00
4 Mandor L.04 OH 0.005 155,000.00 775.00
JUMLAH TENAGA KERJA 39,175.00
B BAHAN
1 Papan kayu (Papan kayu klas I (bengkirai) ketam) m3 0.0108 11,188,300.00 120,833.64
2 Paku 7 - 10 cm Kg 0.100 23,000.00 2,300.00
JUMLAH HARGA BAHAN 123,133.64
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 162,308.64


E Overhead & Profit 15% x D 24,346.30
F Harga Satuan Pekerjaan (D+E) 186,654.94

A.4.6.1.21.a. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu belian


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.100 105,000.00 10,500.00
2 Tukang kayu L.03 OH 0.200 125,000.00 25,000.00
3 Kepala Tukang L.03 OH 0.020 145,000.00 2,900.00
4 Mandor L.04 OH 0.005 155,000.00 775.00
JUMLAH TENAGA KERJA 39,175.00
B BAHAN
1 Papan kayu (Papan kayu belian ketam) m3 0.0108 14,814,000.00 159,991.20
2 Paku 7 - 10 cm Kg 0.100 23,000.00 2,300.00
JUMLAH HARGA BAHAN 162,291.20
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 201,466.20


E Overhead & Profit 15% x D 30,219.93
F Harga Satuan Pekerjaan (D+E) 231,686.13

Pekerjaan Kayu 96
A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.100 105,000.00 10,500.00
2 Tukang kayu L.03 OH 0.200 125,000.00 25,000.00
3 Kepala Tukang L.03 OH 0.020 145,000.00 2,900.00
4 Mandor L.04 OH 0.005 155,000.00 775.00
JUMLAH TENAGA KERJA 39,175.00
B BAHAN
1 Papan kayu (Papan kayu klas I (bengkirai) ketam) m3 0.011 11,188,300.00 123,071.30
2 Paku 7 - 10 cm Kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 124,221.30
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 163,396.30


E Overhead & Profit 15% x D 24,509.45
F Harga Satuan Pekerjaan (D+E) 187,905.75

A.4.6.1.22.a. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu belian


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.100 105,000.00 10,500.00
2 Tukang kayu L.03 OH 0.200 125,000.00 25,000.00
3 Kepala Tukang L.03 OH 0.020 145,000.00 2,900.00
4 Mandor L.04 OH 0.005 155,000.00 775.00
JUMLAH TENAGA KERJA 39,175.00
B BAHAN
1 Papan kayu belian ketam m3 0.011 14,814,000.00 162,954.00
2 Paku 7 - 10 cm Kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 164,104.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 203,279.00


E Overhead & Profit 15% x D 30,491.85
F Harga Satuan Pekerjaan (D+E) 233,770.85

A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Tukang kayu L.03 OH 0.450 125,000.00 56,250.00
3 Kepala Tukang L.03 OH 0.045 145,000.00 6,525.00
4 Mandor L.04 OH 0.008 155,000.00 1,240.00
JUMLAH TENAGA KERJA 79,765.00
B BAHAN
1 Balok kayu mabang tidak ketam (7/7) m3 0.028 4,716,717.69 132,068.10
2 Paku 5 dan 7 cm Kg 0.150 23,000.00 3,450.00
JUMLAH HARGA BAHAN 135,518.10
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 215,283.10


E Overhead & Profit 15% x D 32,292.46
F Harga Satuan Pekerjaan (D+E) 247,575.56

A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )

Pekerjaan Kayu 97
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.200 105,000.00 21,000.00
2 Tukang kayu L.03 OH 0.600 125,000.00 75,000.00
3 Kepala Tukang L.03 OH 0.060 145,000.00 8,700.00
4 Mandor L.04 OH 0.010 155,000.00 1,550.00
JUMLAH TENAGA KERJA 106,250.00
B BAHAN
1 Balok kayu (Ky. klas II Mabang uk. 6/12 - 4 M ( tdk ketam ) M3 0.028 4,224,000.00 118,272.00
2 Paku 5 dan 10 Kg 0.150 23,000.00 3,450.00
3 Plywood tebal 3 mm ukuran (120 x 240) cm Lembar 0.860 70,000.00 60,200.00
4 Lem kayu Kg 0.560 20,000.00 11,200.00
JUMLAH HARGA BAHAN 193,122.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 299,372.00


E Overhead & Profit 15% x D 44,905.80
F Harga Satuan Pekerjaan (D+E) 344,277.80

Pekerjaan Kayu 98
SATUAN PEKERJAAN KUNCI DAN KACA

A.4.6.2.1. Pemasangan 1 buah kunci tanam antik


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.060 105,000.00 6,300.00
2 Tukang kayu L.03 OH 0.600 125,000.00 75,000.00
3 Kepala Tukang L.03 OH 0.060 145,000.00 8,700.00
4 Mandor L.04 OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 90,465.00
B BAHAN
1 Kunci tanam antik Bh 1.000 47,500.00 47,500.00
JUMLAH HARGA BAHAN 47,500.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 137,965.00


E Overhead & Profit 15% x D 20,694.75
F Harga Satuan Pekerjaan (D+E) 158,659.75

A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.010 105,000.00 1,050.00
2 Tukang kayu L.03 OH 0.500 125,000.00 62,500.00
3 Kepala Tukang L.03 OH 0.050 145,000.00 7,250.00
4 Mandor L.04 OH 0.005 155,000.00 775.00
JUMLAH TENAGA KERJA 71,575.00
B BAHAN
1 Kunci tanam biasa Bh 1.000 55,000.00 55,000.00
JUMLAH HARGA BAHAN 55,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 126,575.00


E Overhead & Profit 15% x D 18,986.25
F Harga Satuan Pekerjaan (D+E) 145,561.25

A.4.6.2.2.a. Pemasangan 1 buah kunci tanam 2 slag


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.010 105,000.00 1,050.00
2 Tukang kayu L.03 OH 0.500 125,000.00 62,500.00
3 Kepala Tukang L.03 OH 0.050 145,000.00 7,250.00
4 Mandor L.04 OH 0.005 155,000.00 775.00
JUMLAH TENAGA KERJA 71,575.00
B BAHAN
1 Kunci tanam 2 slag (setaraf beluci) Bh 1.000 180,000.00 180,000.00
JUMLAH HARGA BAHAN 180,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 251,575.00


E Overhead & Profit 15% x D 37,736.25

Pekerjaan Kunci dan Kaca 99


F Harga Satuan Pekerjaan (D+E) 289,311.25

A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.005 105,000.00 525.00
2 Tukang kayu L.03 OH 0.500 125,000.00 62,500.00
3 Kepala Tukang L.03 OH 0.050 145,000.00 7,250.00
4 Mandor L.04 OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 70,740.00
B BAHAN
1 Kunci tanam biasa Bh 1.000 55,000.00 55,000.00
JUMLAH HARGA BAHAN 55,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 125,740.00


E Overhead & Profit 15% x D 18,861.00
F Harga Satuan Pekerjaan (D+E) 144,601.00

A.4.6.2.4. Pemasangan 1 buah kunci silinder


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.005 105,000.00 525.00
2 Tukang kayu L.03 OH 0.500 125,000.00 62,500.00
3 Kepala Tukang L.03 OH 0.050 145,000.00 7,250.00
4 Mandor L.04 OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 70,740.00
B BAHAN
1 Kunci silinder Bh 1.000 78,800.00 78,800.00
JUMLAH HARGA BAHAN 78,800.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 149,540.00


E Overhead & Profit 15% x D 22,431.00
F Harga Satuan Pekerjaan (D+E) 171,971.00

A.4.6.2.5. Pemasangan 1 buah engsel pintu


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.015 105,000.00 1,575.00
2 Tukang kayu L.03 OH 0.150 125,000.00 18,750.00
3 Kepala Tukang L.03 OH 0.015 145,000.00 2,175.00
4 Mandor L.04 OH 0.0008 155,000.00 124.00
JUMLAH TENAGA KERJA 22,624.00
B BAHAN
1 Engsel pintu Bh 1.000 29,000.00 29,000.00
JUMLAH HARGA BAHAN 29,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 51,624.00


E Overhead & Profit 15% x D 7,743.60
F Harga Satuan Pekerjaan (D+E) 59,367.60

Pekerjaan Kunci dan Kaca 100


A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.010 105,000.00 1,050.00
2 Tukang kayu L.03 OH 0.100 125,000.00 12,500.00
3 Kepala Tukang L.03 OH 0.010 145,000.00 1,450.00
4 Mandor L.04 OH 0.0005 155,000.00 77.50
JUMLAH TENAGA KERJA 15,077.50
B BAHAN
1 Engsel kupu-kupu Bh 1.000 18,800.00 18,800.00
JUMLAH HARGA BAHAN 18,800.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 33,877.50


E Overhead & Profit 15% x D 5,081.63
F Harga Satuan Pekerjaan (D+E) 38,959.13

A.4.6.2.9. Pemasangan 1 buah kait angin


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.015 105,000.00 1,575.00
2 Tukang kayu L.03 OH 0.150 125,000.00 18,750.00
3 Kepala Tukang L.03 OH 0.015 145,000.00 2,175.00
4 Mandor L.04 OH 0.008 155,000.00 1,240.00
JUMLAH TENAGA KERJA 23,740.00
B BAHAN
1 Kait angin Bh 1.000 14,400.00 14,400.00
JUMLAH HARGA BAHAN 14,400.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 38,140.00


E Overhead & Profit 15% x D 5,721.00
F Harga Satuan Pekerjaan (D+E) 43,861.00

A.4.6.2.10. Pemasangan 1 buah door closer


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.050 105,000.00 5,250.00
2 Tukang kayu L.03 OH 0.500 125,000.00 62,500.00
3 Kepala Tukang L.03 OH 0.050 145,000.00 7,250.00
4 Mandor L.04 OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 75,465.00
B BAHAN
1 Door clooser Set 1.000 250,000.00 250,000.00
JUMLAH HARGA BAHAN 250,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 325,465.00


E Overhead & Profit 15% x D 48,819.75
F Harga Satuan Pekerjaan (D+E) 374,284.75

Pekerjaan Kunci dan Kaca 101


A.4.6.2.11. Pemasangan 1 buah kunci slot pintu
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.020 105,000.00 2,100.00
2 Tukang kayu L.03 OH 0.200 125,000.00 25,000.00
3 Kepala Tukang L.03 OH 0.020 145,000.00 2,900.00
4 Mandor L.04 OH 0.001 155,000.00 155.00
JUMLAH TENAGA KERJA 30,155.00
B BAHAN
1 Kunci slot pintu Bh 1.000 18,900.00 18,900.00
JUMLAH HARGA BAHAN 18,900.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 49,055.00


E Overhead & Profit 15% x D 7,358.25
F Harga Satuan Pekerjaan (D+E) 56,413.25

A.4.6.2.11.a. Pemasangan 1 buah kunci slot jendela


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.020 105,000.00 2,100.00
2 Tukang kayu L.03 OH 0.200 125,000.00 25,000.00
3 Kepala Tukang L.03 OH 0.020 145,000.00 2,900.00
4 Mandor L.04 OH 0.001 155,000.00 155.00
JUMLAH TENAGA KERJA 30,155.00
B BAHAN
1 Kunci slot jendela Bh 1.000 8,800.00 8,800.00
JUMLAH HARGA BAHAN 8,800.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 38,955.00


E Overhead & Profit 15% x D 5,843.25
F Harga Satuan Pekerjaan (D+E) 44,798.25

A.4.6.2.12. Pemasangan 1 buah Door holder


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.050 105,000.00 5,250.00
2 Tukang kayu L.03 OH 0.500 125,000.00 62,500.00
3 Kepala Tukang L.03 OH 0.050 145,000.00 7,250.00
4 Mandor L.04 OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 75,465.00
B BAHAN
1 Door holder Bh 1.000 170,000.00 170,000.00
JUMLAH HARGA BAHAN 170,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 245,465.00


E Overhead & Profit 15% x D 36,819.75
F Harga Satuan Pekerjaan (D+E) 282,284.75

A.4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm


HARGA BIAYA
NO. URAIAN PEKERJAAN SATUAN KOEFISIEN

Pekerjaan Kunci dan Kaca 102


NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.015 105,000.00 1,575.00
2 Tukang kayu L.03 OH 0.150 125,000.00 18,750.00
3 Kepala Tukang L.03 OH 0.015 145,000.00 2,175.00
4 Mandor L.04 OH 0.0008 155,000.00 124.00
JUMLAH TENAGA KERJA 22,624.00
B BAHAN
1 Kaca tebal 3mm m² 1.100 150,000.00 165,000.00
2 Sealant Kg 0.050 35,000.00 1,750.00
JUMLAH HARGA BAHAN 166,750.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 189,374.00


E Overhead & Profit 15% x D 28,406.10
F Harga Satuan Pekerjaan (D+E) 217,780.10

A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.015 105,000.00 1,575.00
2 Tukang kayu L.03 OH 0.150 125,000.00 18,750.00
3 Kepala Tukang L.03 OH 0.015 145,000.00 2,175.00
4 Mandor L.04 OH 0.0008 155,000.00 124.00
JUMLAH TENAGA KERJA 22,624.00
B BAHAN
1 Kaca tebal 5 mm m² 1.100 200,000.00 220,000.00
2 Sealant Kg 0.050 35,000.00 1,750.00
JUMLAH HARGA BAHAN 221,750.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 244,374.00


E Overhead & Profit 15% x D 36,656.10
F Harga Satuan Pekerjaan (D+E) 281,030.10

A.4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.017 105,000.00 1,785.00
2 Tukang kayu L.03 OH 0.170 125,000.00 21,250.00
3 Kepala Tukang L.03 OH 0.017 145,000.00 2,465.00
4 Mandor L.04 OH 0.0009 155,000.00 139.50
JUMLAH TENAGA KERJA 25,639.50
B BAHAN
1 Kaca tebal 8 mm m² 1.100 398,000.00 437,800.00
2 Sealant Kg 0.070 35,000.00 2,450.00
JUMLAH HARGA BAHAN 440,250.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 465,889.50


E Overhead & Profit 15% x D 69,883.43
F Harga Satuan Pekerjaan (D+E) 535,772.93

Pekerjaan Kunci dan Kaca 103


A.4.6.2.19. Pemasangan 1 m2 kaca tebal 12 mm
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.025 105,000.00 2,625.00
2 Tukang kayu L.03 OH 0.250 125,000.00 31,250.00
3 Kepala Tukang L.03 OH 0.025 145,000.00 3,625.00
4 Mandor L.04 OH 0.0013 155,000.00 201.50
JUMLAH TENAGA KERJA 37,701.50
B BAHAN
1 Kaca tebal 12 mm m² 1.100 640,000.00 704,000.00
2 Sealant Kg 0.070 35,000.00 2,450.00
JUMLAH HARGA BAHAN 706,450.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 744,151.50


E Overhead & Profit 15% x D 111,622.73
F Harga Satuan Pekerjaan (D+E) 855,774.23

A.4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.015 105,000.00 1,575.00
2 Tukang kayu L.03 OH 0.150 125,000.00 18,750.00
3 Kepala Tukang L.03 OH 0.015 145,000.00 2,175.00
4 Mandor L.04 OH 0.008 155,000.00 1,240.00
JUMLAH TENAGA KERJA 23,740.00
B BAHAN
1 Kaca cermin 5 mm m² 1.100 418,000.00 459,800.00
JUMLAH HARGA BAHAN 459,800.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 483,540.00


E Overhead & Profit 15% x D 72,531.00
F Harga Satuan Pekerjaan (D+E) 556,071.00

A.4.6.2.20.a. Pemasangan 1 m2 kaca cermin tebal 3 mm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.015 105,000.00 1,575.00
2 Tukang kayu L.03 OH 0.150 125,000.00 18,750.00
3 Kepala Tukang L.03 OH 0.015 145,000.00 2,175.00
4 Mandor L.04 OH 0.008 155,000.00 1,240.00
JUMLAH TENAGA KERJA 23,740.00
B BAHAN
1 Kaca cermin 3 mm m² 1.100 275,000.00 302,500.00
JUMLAH HARGA BAHAN 302,500.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 326,240.00


E Overhead & Profit 15% x D 48,936.00
F Harga Satuan Pekerjaan (D+E) 375,176.00

A.4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )

Pekerjaan Kunci dan Kaca 104


1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.075 105,000.00 7,875.00
2 Tukang kayu L.03 OH 0.150 125,000.00 18,750.00
3 Kepala Tukang L.03 OH 0.015 145,000.00 2,175.00
4 Mandor L.04 OH 0.004 155,000.00 620.00
JUMLAH TENAGA KERJA 29,420.00
B BAHAN
1 Kaca patri 5 mm m² 1.100 550,000.00 605,000.00
2 Sealant Kg 0.050 35,000.00 1,750.00
JUMLAH HARGA BAHAN 606,750.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 636,170.00


E Overhead & Profit 15% x D 95,425.50
F Harga Satuan Pekerjaan (D+E) 731,595.50

Pekerjaan Kunci dan Kaca 105


4.7.1. SATUAN PEKERJAAN PENGECATAN

A.4.7.1.1. 1 m2 Pengikisan / pengerokan permukaan cat lama


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Mandor L.04 OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 16,215.00
B BAHAN
1 Soda api Kg 0.050 25,000.00 1,250.00
JUMLAH HARGA BAHAN 1,250.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 17,465.00


E Overhead & Profit 15% x D 2,619.75
F Harga Satuan Pekerjaan (D+E) 20,084.75

A.4.7.1.2. 1 m2 Pencucian bidang permukaan tembok yang pernah dicat


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Mandor L.04 OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 16,215.00
B BAHAN
1 Sabun Kg 0.050 15,700.00 785.00
JUMLAH HARGA BAHAN 785.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 17,000.00


E Overhead & Profit 15% x D 2,550.00
F Harga Satuan Pekerjaan (D+E) 19,550.00

A.4.7.1.3. 1 m2 Pengerokan karat pada permukaan baja cara manual


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00 15,750.00
2 Mandor L.04 OH 0.008 155,000.00 1,240.00
JUMLAH TENAGA KERJA 16,990.00
B BAHAN
1 Sabun Kg 0.050 15,700.00 785.00
JUMLAH HARGA BAHAN 785.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 17,775.00


E Overhead & Profit 15% x D 2,666.25
F Harga Satuan Pekerjaan (D+E) 20,441.25

A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.070 105,000.00 7,350.00
2 Tukang cat L.02 OH 0.009 125,000.00 1,125.00
3 Kepala tukang L.03 OH 0.006 145,000.00 870.00
4 Mandor L.04 OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 9,810.00
B BAHAN
1 Cat menie Kg 0.200 52,000.00 10,400.00
2 Plamur Kg 0.150 31,500.00 4,725.00
3 Cat dasar Kg 0.170 70,000.00 11,900.00
4 Cat penutup (cat kilat) Kg 0.260 70,000.00 18,200.00
5 Kuas Bh 0.010 25,000.00 250.00
6 Pengencer Ltr 0.030 25,000.00 750.00
7 Ampelas Lbr 0.200 4,000.00 800.00
JUMLAH HARGA BAHAN 47,025.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 56,835.00


E Overhead & Profit 15% x D 8,525.25
F Harga Satuan Pekerjaan (D+E) 65,360.25

A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 3 lapis cat penutup)
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.070 105,000.00 7,350.00
2 Tukang cat L.02 OH 0.105 125,000.00 13,125.00
3 Kepala tukang L.03 OH 0.004 145,000.00 580.00
4 Mandor L.04 OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 21,520.00
B BAHAN
1 Cat menie Kg 0.200 52,000.00 10,400.00
2 Plamur Kg 0.150 31,500.00 4,725.00
3 Cat dasar Kg 0.170 70,000.00 11,900.00
4 Cat penutup (cat kilat) Kg 0.350 70,000.00 24,500.00
5 Kuas Bh 0.010 25,000.00 250.00
6 Pengencer Kg 0.030 25,000.00 750.00
7 Ampelas Lbr 0.200 4,000.00 800.00
JUMLAH HARGA BAHAN 53,325.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 74,845.00


E Overhead & Profit 15% x D 11,226.75
F Harga Satuan Pekerjaan (D+E) 86,071.75

A.4.7.1.5.a. Pengecatan 1 m2 bidang kayu lama


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.070 105,000.00 7,350.00
2 Tukang cat L.02 OH 0.075 125,000.00 9,375.00
3 Kepala tukang L.03 OH 0.0075 145,000.00 1,087.50
4 Mandor L.04 OH 0.0025 155,000.00 387.50
JUMLAH TENAGA KERJA 18,200.00
B BAHAN
1 Plamur Kg 0.150 52,000.00 7,800.00
2 Cat dasar Kg 0.170 31,500.00 5,355.00
3 Cat penutup (cat kilat) Kg 0.170 70,000.00 11,900.00
JUMLAH HARGA BAHAN 25,055.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 43,255.00


E Overhead & Profit 15% x D 6,488.25
F Harga Satuan Pekerjaan (D+E) 49,743.25

A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.040 105,000.00 4,200.00
2 Tukang cat L.02 OH 0.063 125,000.00 7,875.00
3 Kepala tukang L.03 OH 0.063 145,000.00 9,135.00
4 Mandor L.04 OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 21,675.00
B BAHAN
1 Teak Oil Ltr 0.360 60,000.00 21,600.00
JUMLAH HARGA BAHAN 21,600.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 43,275.00


E Overhead & Profit 15% x D 6,491.25
F Harga Satuan Pekerjaan (D+E) 49,766.25

A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.040 105,000.00 4,200.00
2 Tukang cat L.02 OH 0.060 125,000.00 7,500.00
3 Kepala tukang L.03 OH 0.016 145,000.00 2,320.00
4 Mandor L.04 OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 14,485.00
B BAHAN
1 Politur Kg 0.150 64,000.00 9,600.00
2 Politur jadi Kg 0.372 64,000.00 23,808.00
3 Ampelas Lbr 2.000 4,000.00 8,000.00
JUMLAH HARGA BAHAN 41,408.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 55,893.00


E Overhead & Profit 15% x D 8,383.95
F Harga Satuan Pekerjaan (D+E) 64,276.95

A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.100 11.00 1.10
2 Mandor L.04 OH 0.006 44.00 0.26
JUMLAH TENAGA KERJA 1.36
B BAHAN
1 Residu atau ter Ltr 0.350 58,400.00 20,440.00
JUMLAH HARGA BAHAN 20,440.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 20,441.36


E Overhead & Profit 15% x D 3,066.20
F Harga Satuan Pekerjaan (D+E) 23,507.57

A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.160 105,000.00 16,800.00
2 Tukang cat L.02 OH 0.160 125,000.00 20,000.00
3 Kepala tukang L.03 OH 0.016 145,000.00 2,320.00
4 Mandor L.04 OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 39,585.00
B BAHAN
1 Vernis Ltr 0.150 45,000.00 6,750.00
2 Dempul Kg 0.050 31,500.00 1,575.00
3 Ampelas Lbr 0.100 4,000.00 400.00
JUMLAH HARGA BAHAN 8,725.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 48,310.00


E Overhead & Profit 15% x D 7,246.50
F Harga Satuan Pekerjaan (D+E) 55,556.50

A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.020 105,000.00 2,100.00
2 Tukang cat L.02 OH 0.063 125,000.00 7,875.00
3 Kepala tukang L.03 OH 0.0063 145,000.00 913.50
4 Mandor L.04 OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 11,353.50
B BAHAN
1 Plamur Kg 0.100 31,500.00 3,150.00
2 Cat dasar (setara vinilex) Kg 0.100 27,000.00 2,700.00
3 Cat penutup (setara vinilex) Kg 0.260 28,000.00 7,280.00
JUMLAH HARGA BAHAN 13,130.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 24,483.50


E Overhead & Profit 15% x D 3,672.53
F Harga Satuan Pekerjaan (D+E) 28,156.03

A.4.7.1.10.a. Pengecatan 1 m2 tembok baru interior mutu baik setara mowilex ( 1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.020 105,000.00 2,100.00
2 Tukang cat L.02 OH 0.063 125,000.00 7,875.00
3 Kepala tukang L.03 OH 0.0063 145,000.00 913.50
4 Mandor L.04 OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 11,353.50
B BAHAN
1 Plamur Kg 0.100 31,500.00 3,150.00
2 Cat dasar (setara mowilex) Kg 0.100 70,000.00 7,000.00
3 Cat interior (setara mowilex) Kg 0.260 100,000.00 26,000.00
JUMLAH HARGA BAHAN 36,150.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 47,503.50


E Overhead & Profit 15% x D 7,125.53
F Harga Satuan Pekerjaan (D+E) 54,629.03

A.4.7.1.10.b. Pengecatan 1 m2 tembok baru interior mutu baik setara dulux ( 1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.020 105,000.00 2,100.00
2 Tukang cat L.02 OH 0.063 125,000.00 7,875.00
3 Kepala tukang L.03 OH 0.0063 145,000.00 913.50
4 Mandor L.04 OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 11,353.50
B BAHAN
1 Plamur Kg 0.100 31,500.00 3,150.00
2 Cat dasar (setara dulux) Kg 0.100 140,000.00 14,000.00
3 Cat interior (setara dulux) Kg 0.260 104,000.00 27,040.00
JUMLAH HARGA BAHAN 44,190.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 55,543.50


E Overhead & Profit 15% x D 8,331.53
F Harga Satuan Pekerjaan (D+E) 63,875.03

4.7.1.10.c. Pengecatan 1 m2 tembok baru exterior setara mowilex ( 1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.020 105,000.00 2,100.00
2 Tukang cat L.02 OH 0.063 125,000.00 7,875.00
3 Kepala tukang L.03 OH 0.0063 145,000.00 913.50
4 Mandor L.04 OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 11,353.50
B BAHAN
1 Plamur Kg 0.100 31,500.00 3,150.00
2 Cat dasar (setara mowilex) Kg 0.100 70,000.00 7,000.00
3 Cat exterior wheatercoat (setara mowilex) Kg 0.260 120,000.00 31,200.00
JUMLAH HARGA BAHAN 41,350.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 52,703.50


E Overhead & Profit 15% x D 7,905.53
F Harga Satuan Pekerjaan (D+E) 60,609.03

A.4.7.1.10.d. Pengecatan 1 m2 tembok baru exterior mutu baik setara dulux ( 1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.020 105,000.00 2,100.00
2 Tukang cat L.02 OH 0.063 125,000.00 7,875.00
3 Kepala tukang L.03 OH 0.0063 145,000.00 913.50
4 Mandor L.04 OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 11,353.50
B BAHAN
1 Palmmur Kg 0.100 31,500.00 3,150.00
2 Cat dasar (setara dulux) Kg 0.100 140,000.00 14,000.00
3 Cat exterior wheater shield (setara dulux) Kg 0.260 115,000.00 29,900.00
JUMLAH HARGA BAHAN 47,050.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 58,403.50


E Overhead & Profit 15% x D 8,760.53
F Harga Satuan Pekerjaan (D+E) 67,164.03

A.4.7.1.11. Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.028 105,000.00 2,940.00
2 Tukang cat L.02 OH 0.042 125,000.00 5,250.00
3 Kepala tukang L.03 OH 0.0042 145,000.00 609.00
4 Mandor L.04 OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 9,264.00
B BAHAN
1 Cat dasar (setara vinilex) Kg 0.120 27,000.00 3,240.00
2 Cat penutup (setara vinilex) Kg 0.180 28,000.00 5,040.00
JUMLAH HARGA BAHAN 8,280.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 17,544.00


E Overhead & Profit 15% x D 2,631.60
F Harga Satuan Pekerjaan (D+E) 20,175.60

A.4.7.1.11.a. Pengecatan 1 m2 tembok lama interior mutu baik setara mowilex ( 1 lapis cat dasar, 2 lapis cat penutup)
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.028 105,000.00 2,940.00
2 Tukang cat L.02 OH 0.042 125,000.00 5,250.00
3 Kepala tukang L.03 OH 0.0042 145,000.00 609.00
4 Mandor L.04 OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 9,264.00
B BAHAN
1 Cat dasar (setara mowilex) Kg 0.120 70,000.00 8,400.00
2 Cat interior (setara mowilex) Kg 0.180 100,000.00 18,000.00
JUMLAH HARGA BAHAN 26,400.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 35,664.00


E Overhead & Profit 15% x D 5,349.60
F Harga Satuan Pekerjaan (D+E) 41,013.60

A.4.7.1.11.b. Pengecatan 1 m2 tembok lama interior mutu baik setara dulux ( 1 lapis cat dasar, 2 lapis cat penutup)
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.028 105,000.00 2,940.00
2 Tukang cat L.02 OH 0.042 125,000.00 5,250.00
3 Kepala tukang L.03 OH 0.0042 145,000.00 609.00
4 Mandor L.04 OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 9,264.00
B BAHAN
1 Cat dasar (setara dulux) Kg 0.120 140,000.00 16,800.00
2 Cat interior (setara dulux) Kg 0.180 104,000.00 18,720.00
JUMLAH HARGA BAHAN 35,520.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 44,784.00


E Overhead & Profit 15% x D 6,717.60
F Harga Satuan Pekerjaan (D+E) 51,501.60

A.4.7.1.11.c. Pengecatan 1 m2 tembok lama exterior mutu baik setara mowilex ( 1 lapis cat dasar, 2 lapis cat penutup)
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.028 105,000.00 2,940.00
2 Tukang cat L.02 OH 0.042 125,000.00 5,250.00
3 Kepala tukang L.03 OH 0.0042 145,000.00 609.00
4 Mandor L.04 OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 9,264.00
B BAHAN
1 Cat dasar (setara mowilex) Kg 0.120 70,000.00 8,400.00
2 Cat exterior wheatercoat (setara mowilex) Kg 0.180 120,000.00 21,600.00
JUMLAH HARGA BAHAN 30,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 39,264.00


E Overhead & Profit 15% x D 5,889.60
F Harga Satuan Pekerjaan (D+E) 45,153.60

A.4.7.1.11.d. Pengecatan 1 m2 tembok lama exterior mutu baik setara dulux ( 1 lapis cat dasar, 2 lapis cat penutup)
HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.028 105,000.00 2,940.00
2 Tukang cat L.02 OH 0.042 125,000.00 5,250.00
3 Kepala tukang L.03 OH 0.0042 145,000.00 609.00
4 Mandor L.04 OH 0.003 155,000.00 465.00
JUMLAH TENAGA KERJA 9,264.00
B BAHAN
1 Cat dasar (setara dulux) Kg 0.120 140,000.00 16,800.00
2 Cat exterior wheatercoat (setara dulux) Kg 0.180 115,000.00 20,700.00
JUMLAH HARGA BAHAN 37,500.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 46,764.00


E Overhead & Profit 15% x D 7,014.60
F Harga Satuan Pekerjaan (D+E) 53,778.60

A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.020 105,000.00 2,100.00
2 Tukang cat L.02 OH 0.200 125,000.00 25,000.00
3 Kepala tukang L.03 OH 0.020 145,000.00 2,900.00
4 Mandor L.04 OH 0.0025 155,000.00 387.50
JUMLAH TENAGA KERJA 30,387.50
B BAHAN
1 Menie besi Kg 0.100 52,000.00 5,200.00
2 Kuas (4") Bh 0.010 25,000.00 250.00
JUMLAH HARGA BAHAN 5,450.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 35,837.50


E Overhead & Profit 15% x D 5,375.63
F Harga Satuan Pekerjaan (D+E) 41,213.13
A.5.1.1. HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.32.a Pemasangan 1 m’ pipa PVC tipe D diameter 4”


HARGA BIAYA
NO. URAIAN PEKERJAAN KODE SATUAN KOEFISIEN SATUAN SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.081 105,000.00 8,505.00
2 Tukang batu L.02 OH 0.135 125,000.00 16,875.00
3 Kepala tukang L.03 OH 0.014 145,000.00 1,957.50
4 Mandor L.04 OH 0.004 155,000.00 620.00
JUMLAH TENAGA KERJA 27,957.50
B BAHAN
1 Pipa PVC 4” (setara wavin) M 1.20 43,325.000 51,990.00
2 Perlengkapan % 35.00 10,831.250 3,790.94
JUMLAH HARGA BAHAN 55,780.94
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 83,738.44


E Overhead & Profit 15% x D 12,560.77
F Harga Satuan Pekerjaan (D+E) 96,299.20
STANDAR HARGA SATUAN DASAR UPAH DAN BAHAN

STANDAR HARGA SATUAN DASAR UPAH

HARGA SATUAN DASAR


(TIDAK TERMASUK
NO MATERIAL SATUAN KODE
PROFIT & OVERHEAD)
(Rp)

A. UPAH
1 Pekerja Org/hari L. 01 105,000.00
2 Tukang Gali / Batu / Tembok / Kayu /Besi / Cat / Pipa / Cor / Semen / Listrik / Pancang Org/hari L. 02 125,000.00
3 Kepala Tukang Org/hari L. 03 145,000.00
4 Mandor Org/hari L. 04 155,000.00
5 Ahli alat berat (mekanik) Org/hari L. 07 125,000.00
6 Operator Alat Berat Org/hari L. 08 170,000.00
7 Pembantu Operator Org/hari L. 09 100,000.00
8 Supir Truk Org/hari L. 10 115,000.00
9 Kenek truk Org/hari L. 11 80,000.00

STANDAR HARGA SATUAN DASAR BAHAN

HARGA SATUAN DASAR


(TIDAK TERMASUK
NO MATERIAL SATUAN
PROFIT & OVERHEAD)
(Rp)

B. BAHAN PENGISI
1 Batu Kong M³ 300,000.00
2 Batu Sap Pinang M³ 320,000.00
3 Batu pecah 15-20 cm M³ 335,000.00
4 Batu pecah 10-15 cm M³ 350,000.00
5 Batu pecah 5-7 cm M³ 385,000.00
6 Batu pecah 3-5 cm M³ 405,000.00
7 Batu pecah 2-3 cm M³ 435,000.00
8 Batu pecah 1-2 cm M³ 475,000.00
9 Batu pecah 1-1 cm M³ 500,000.00
10 Batu pecah 0,5 cm M³ 500,000.00
11 Stone Dust M³ 350,000.00
12 Aspal Kg 13,790.00
13 Aspal Emulsi (Teak Coat) Kg 14,175.00
14 Aspal Emulsi (Prime Coat) Kg 14,175.00
15 Aspal Sealent Kg 35,000.00
16 Pasir Kasar M³ 125,000.00
17 Pasir Halus M³ 125,000.00
18 Semen PC Zak 75,000.00
19 Semen PC Kg 1,500.00
20 Tanah Ex. Peniraman M³ 190,000.00
21 Tanah Pilihan (Paladis/Tanah Bukit Tokok) M³ 284,000.00
22 Paving Block Persegi Panjang Bh 3,750.00
23 Paving Stone Persegi Panjang (21 x 10,5 x 8) Bh 2,650.00
24 Paving Stone Persegi Panjang (21 x 10,5 x 10) Bh 3,750.00
25 Paving Stone Segi 5 (21 x 30 x 6) Bh 4,200.00
26 Paving Stone Diamond (Segi 6, 18 x 10.5 x 7 ) Bh 3,250.00
27 Batu Bata 5 x 11 x 22cm Bh 2,000.00
28 Bataco 15 x 30 x 7 cm Bh 1,800.00
29 Bataco 15 x 30 x 6 cm Bh 1,600.00
30 Bataco 20 x 40 x 9 cm ( press ) Bh 2,500.00
31 Bataco 20 x 40 x 7 cm ( press ) Bh 2,300.00
32 Bata Ringan 20 x 60 x 10 Bh 18,000.00
33 Kerawang ( roster ) 18 x 18 cm Bh 20,000.00
34 Kerawang press ( roster ) 30 x 30 cm Bh 60,500.00
35 Keramik 20 x 20 cm Polished ex Roman Kotak 86,500.00
36 Keramik 20 x 20 cm Unpolished ex Roman Kotak 98,000.00

Hal - 115
HARGA SATUAN DASAR
(TIDAK TERMASUK
NO MATERIAL SATUAN
PROFIT & OVERHEAD)
(Rp)

37 Keramik 30 x 30 cm Polished ex Roman Kotak 100,000.00


38 Keramik 30 x 30 cm Unpolished ex Roman Kotak 100,000.00
39 Keramik 40 x 40 cm Polished ex Roman Kotak 110,000.00
40 Keramik 40 x 40 cm Unpolished ex Roman Kotak 110,000.00
41 Keramik 30 x 60 cm Polished (setaraf Indogress) Kotak 250,000.00
42 Keramik 30 x 60 cm Unpolished (setaraf Indogress) Kotak 250,000.00
43 Keramik 40 x 40 cm Polished (setaraf Indogress) Kotak 155,000.00
44 Keramik 40 x 40 cm Unpolished (setaraf Indogress) Kotak 155,000.00
45 Keramik 60 x 60 cm Polished (setaraf Indogress) Kotak 320,000.00
46 Keramik 60 x 60 cm Unpolished (setaraf Indogress) Kotak 323,000.00
47 Keramik 60 x 60 cm Granit Kotak 160,000.00
48 Keramik dinding 20 x 20 cm ex Roman Kotak 98,750.00
49 Keramik dinding 20 x 25 cm ex Roman Kotak 102,000.00
50 Marmer M² 1,400,000.00
51 Wood Flooring M² 420,000.00
52 List Keramik WC. 8 x 20 cm Bh 11,600.00
53 Plint Kayu uk. 2 x 10 cm Bh 61,000.00
54 Floor Hardener Kg 16,600.00
55 Beton Ready Mix B 0 M³ 1,072,500.00
56 Beton Ready Mix 125 M³ 1,108,250.00
57 Beton Ready Mix 150 M³ 1,025,000.00
58 Beton Ready Mix 175 M³ 1,194,050.00
59 Beton Ready Mix 200 M³ 1,134,000.00
60 Beton Ready Mix 225 M³ 1,329,800.00
61 Beton Ready Mix 250 M³ 1,372,800.00
62 Beton Ready Mix 275 M³ 1,240,000.00
63 Beton Ready Mix 300 M³ 1,430,000.00
64 Beton Ready Mix 325 M³ 1,306,500.00
65 Beton Ready Mix 350 M³ 1,530,100.00
66 Beton Ready Mix 375 M³ 1,377,500.00
67 Beton Ready Mix 400 M³ 1,601,600.00
68 Beton Ready Mix 425 M³ 1,432,500.00
69 Beton Ready Mix 450 M³ 1,673,100.00
70 Beton Ready Mix 475 M³ 1,504,000.00
71 Beton Ready Mix 500 M³ 1,536,500.00
72 Additive Ready Mix Liter 38,300.00
73 Karung Goni Curing Beton ( 0.7m² ) Lembar 11,300.00
74 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 20 x 20, 4 D 16, ø 6 K 300 - 6m Btg 1,440,000.00
75 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 20 x 20, 8 D 13, ø 6 K 350 - 6m Btg 1,620,000.00
76 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, 4 D 16, ø 6 K 300 - 6m Btg 1,740,000.00
77 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, 8 D 13, ø 6 K 350 -6 m Btg 1,800,000.00
78 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 30 x 30, 4 D 16, ø 6 K 450 - 6m Btg 2,460,000.00
79 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 20 x 20, 8 D 13, ø 6 K 350 - 8m Btg 2,240,000.00
80 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, 8 D 16, ø 6 K 350 - 9m Btg 3,825,000.00
81 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 28 x 28 x 28, K 350 - 6m Btg 1,122,000.00
82 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 32 x 32 x 32, K 450 - 6m Btg 1,158,300.00
83 Sheetpile 0,6 x 0,15 x 4 meter K.350 (Besi Ulir D 13 Polos D 6) Btg 1,400,000.00
84 Sheetpile 0,6 x 0,15 x 5 meter K.350 (Besi Ulir D 13 Polos D 6) Btg 1,750,000.00
85 Sheetpile 0,6 x 0,15 x 6 meter K.350 (Besi Ulir D 13 Polos D 6) Btg 2,100,000.00
86 Sewa Pompa Ready Mix (Min. 100 M³) M³ 33,000.00
87 Bahan Plastik Cor Beton M² 1,500.00
88 Kansteen / kerb beton 20x30x60 bh 65,000.00
89 Kansteen / kerb beton 16x28x45 bh 55,000.00

C. BAHAN KAYU
1 Ky. Belian tdk ketam Uk. 6/6 - 4 M M³ 11,805,000.00
2 Ky. Belian tdk ketam Uk. 7/7 - 4 M M³ 11,700,000.00
3 Ky. Belian tdk ketam Uk. 8/8 - 4 M M³ 8,950,000.00
4 Ky. Belian tdk ketam Uk. 8/16 - 4 M M³ 8,750,000.00
5 Ky. Belian tdk ketam Uk. 9/9 - 4 M M³ 9,567,900.00
6 Ky. Belian tdk ketam Uk. 10/10 - 4 M M³ 10,000,000.00
7 Ky. Belian tdk ketam Uk. 12/12 - 4 M M³ 13,020,900.00
8 Ky. Belian tdk ketam Uk. 18/18 - 4 M M³ 10,416,700.00
9 Ky. Belian tdk ketam Uk. 5/10 - 4 M M³ 11,500,000.00
10 Ky. Belian ketam Uk. 6/6 - 4 M M³ 12,800,000.00

Hal - 116
HARGA SATUAN DASAR
(TIDAK TERMASUK
NO MATERIAL SATUAN
PROFIT & OVERHEAD)
(Rp)

11 Ky. Belian ketam Uk. 7/7 - 4 M M³ 12,500,000.00


12 Ky. Belian ketam Uk. 8/8 - 4 M M³ 11,015,700.00
13 Ky. Belian ketam Uk. 5/10 - 4 M M³ 11,000,000.00
14 Ky. Belian ketam Uk. 4/8 - 4 M M³ 11,718,750.00
15 Ky. klas I Bengkirai uk. 8/8 - 4 M ( tdk ketam ) M³ 7,421,875.00
16 Ky. klas I Bengkirai uk. 7/7 - 4 M ( tdk ketam ) M³ 7,500,000.00
17 Ky. klas I Bengkirai uk. 8/8 - 4 M ( ketam ) M³ 7,800,000.00
18 Ky. klas I Bengkirai uk. 7/7 - 4 M ( ketam ) M³ 7,840,000.00
19 Ky. klas I Bengkirai uk. 5/10 - 4 M ( ketam ) M³ 9,050,000.00
20 Kusen Ky Belian uk. 5/10 M1 120,000.00
21 Kusen Ky Kelas I Bangkirai uk. 5/10 M1 80,000.00
22 Kusen Ky Kelas II uk. 5/10 M1 65,000.00
23 Ky. klas II Mabang uk. 8/8 - 4 M ( tdk ketam ) M³ 4,440,000.00
24 Ky. klas II Mabang uk. 7/7 - 4 M ( tdk ketam ) M³ 4,716,717.69
25 Ky. klas II Mabang uk. 4/6 - 4 M ( tdk ketam ) M³ 5,070,000.00
26 Ky. klas II Mabang uk. 5/7 - 4 M ( tdk ketam ) M³ 4,755,000.00
27 Ky. klas II Mabang uk. 5/10 - 4 M ( tdk ketam ) M³ 3,355,000.00
28 Ky. klas II Mabang uk. 6/10 - 4 M ( tdk ketam ) M³ 3,576,000.00
29 Ky. klas II Mabang uk. 6/12 - 4 M ( tdk ketam ) M³ 4,224,000.00
30 Ky. klas II Mabang uk. 4/8 - 4 M ( tdk ketam ) M³ 5,468,750.00
31 Ky. klas II Mabang uk. 8/15 - 4 M ( tdk ketam ) M³ 4,589,000.00
32 Ky. klas II Mabang uk. 8/12 - 4 M ( tdk ketam ) M³ 4,634,000.00
33 Ky. klas II Mabang uk. 8/8 - 4 M ( ketam ) M³ 4,531,000.00
34 Ky. klas II Mabang uk. 7/7 - 4 M ( ketam ) M³ 5,600,000.00
35 Ky klas III uk. 3/5 - 4 M ( tdk ketam) M³ 2,500,000.00
36 Ky klas III uk. 4/6 - 4 M ( tdk ketam) M³ 2,083,000.00
37 Papan belian ketam (4m) M³ 14,814,000.00
38 Papan belian tdk ketam (4m) M³ 13,880,000.00
39 Papan kayu klas II (mabang) tdk ketam M³ 7,060,000.00
40 Papan kayu klas II (mabang) ketam M³ 8,300,000.00
41 Papan kayu klas I tdk ketam M³ 10,819,800.00
42 Papan kayu klas I ketam M³ 11,188,300.00
43 Papan mal klas III M³ 2,558,000.00
44 Papan Simpiran M³ 1,064,800.00
45 Renglat kayu klas I uk 1/8 cm Btg 18,000.00
46 Kayu profil 10cm Btg 35,000.00
47 Kayu cerucuk /dolken ø 4 - 6 - Pj. 4 M Btg 7,000.00
48 Kayu cerucuk /dolken ø 6 - 8 - Pj. 4 M Btg 9,000.00
49 Kayu cerucuk /dolken ø 8 - 10 - Pj. 4 M Btg 12,000.00
50 Kayu cerucuk /dolken ø12 - Pj. 8 M Btg 85,000.00
51 Kayu cerucuk /dolken ø 15 - Pj. 12 M Btg 150,000.00
52 Kayu Simpiran / Bakar M³ 250,000.00
53 Alas laci Btg 11,000.00
54 Wood Plank M' 77,500.00
55 Bambu Pj. 10 m Btg 12,000.00

D. BAHAN CAT
1 Amplas Lbr 4,000.00
2 Minyak cat Kg 36,000.00
3 Cat kilat setara Dulux Kg 70,000.00
4 Cat kilat setara Avian Kg 70,000.00
5 Plamur Kg 31,500.00
6 Cat Dasar Alkali Setara Dulux Kg 140,000.00
7 Cat Akhir Interior setara Dulux Kg 104,000.00
8 Cat Akhir Eksterior (weather shield) setara Dulux Kg 115,000.00
9 Cat Dasar setara Mowilex Kg 70,000.00
10 Cat Akhir Interior setara Mowilex Kg 100,000.00
11 Cat Akhir Eksterior (weather shield) setara Mowilex Kg 120,000.00
12 Cat Dasar setara Vinilex Kg 27,000.00
13 Cat Akhir Interior setara Vinilex Kg 28,000.00
14 Cat seng (Zinc Chromate) Kg 44,000.00
15 Plitur Kg 64,000.00
16 Thiner Ltr 25,000.00
17 Melamic Ltr 67,000.00
18 Vernis Ltr 45,000.00

Hal - 117
HARGA SATUAN DASAR
(TIDAK TERMASUK
NO MATERIAL SATUAN
PROFIT & OVERHEAD)
(Rp)

19 Meni Kg 52,000.00
20 Oker / Semen Warna Kg 14,000.00
21 Lem Kayu Kg 20,000.00
22 Sealent Kg 107,700.00
23 Soda Api Kg 25,000.00
24 Sabun / cream pembersih kotoran Kg 15,700.00
25 Teak Oil Ltr 60,000.00
26 Ter / Residu Ltr 58,400.00
27 Kuas 4" Bh 25,000.00
28 Cat Marka (non Thermoplas) Kg 65,000.00
29 Cat Marka (Thermoplastic) Kg 95,000.00
30 Cat Kansteen (ex. Matex) Kg 53,750.00
31 Cat Trotoar (ex. Tenokote) Kg 41,250.00
32 Glass Bead Kg 30,000.00
33 Weatherbond Emulsion ( cat kerb ) Kg 39,000.00
34 Cat Water Proofing Kg 78,500.00

E. BAHAN BESI DAN ALUMINIUM


1 Besi Tulangan Beton U 24 Kg 13,500.00
2 Besi Tulangan Beton U 32 Kg 13,500.00
3 Besi wire mesh ø 5 Kg 14,500.00
4 Besi wire mesh ø 6 Kg 14,500.00
5 Besi wire mesh ø 8 Kg 14,500.00
6 Kawat baja/bendrat Kg 25,000.00
7 Simpai roll Kg 30,000.00
8 Kawat simpai Kg 25,000.00
9 Baut dia 4/8 " pj = 20 cm Btg 5,000.00
10 Besi Penahan bh 16,000.00
11 Beugel plat L. 3 cm bh 15,000.00
12 Plat 1,2 x 2,4 x 12 Bh 310,000.00
13 Besi Profil Kg 17,000.00
14 Kawat Las Btg 5,300.00
15 Kawat Las Kg 28,500.00
16 Kawat harmonika M² 45,000.00
17 Kawat kasa M² 16,000.00
18 Pipa galvanis dia 3/4" Btg 230,000.00
19 Pipa galvanis dia 1/2" Btg 190,000.00
20 Pipa galvanis dia 1" Btg 325,000.00
21 Pipa galvanis dia 1 1/4" Btg 410,000.00
22 Pipa galvanis dia 1 1/2" Btg 465,000.00
23 Pipa galvanis dia 2" Btg 610,000.00
24 Pipa galvanis dia 2,5" Btg 785,000.00
25 Pipa galvanis dia 3" Btg 1,015,000.00
26 Pipa galvanis dia 4" Btg 1,465,000.00
27 Pipa galvanis dia 5" Btg 2,000,000.00
28 Pipa galvanis dia 6,5" Btg 2,395,000.00
29 Folding gate M² 715,000.00
30 Rangka Aluminium 1 1/2" x 3" Meter 85,000.00
31 Rangka Aluminium 1 3/4" x 4" Meter 95,000.00
32 Pintu Aluminium std IKP, lengkap 4" Unit 1,500,000.00
33 Kusen Aluminium 3" Putih Meter 120,000.00
34 Kusen Aluminium 3" Hitam Meter 85,000.00
35 Kusen Aluminium 3" Silver Meter 75,000.00
36 Rangka Baja Ringan Zincalume (truss/color) (Tanpa Jurai Dalam - Bentang s/d 16 m) M² 235,200.00
37 Rangka Baja Ringan Zincalume (truss/color) (Tanpa Jurai Dalam - Bentang 17 m s/d 30 m) M² 272,500.00
38 Rangka Baja Ringan Zincalume (truss/color) (Dengan Jurai Dalam - Bentang s/d 16m) M² 250,000.00
39 Rangka Baja Ringan Zincalume (truss/color) (Dengan Jurai Dalam - Bentang 17 m s/d 30 m) M² 304,100.00
40 Rangka Baja Ringan Zincalume (truss/polos) (Tanpa Jurai Dalam - Bentang s/d 16 m) M² 175,000.00
41 Rangka Baja Ringan Zincalume (truss/polos) (Tanpa Jurai Dalam - Bentang 17 m s/d 30 m) M² 225,400.00
42 Rangka Baja Ringan Zincalume (truss/polos) (Dengan Jurai Dalam - Bentang s/d 16m) M² 193,900.00
43 Rangka Baja Ringan Zincalume (truss/polos) (Dengan Jurai Dalam - Bentang 17 m s/d 30 m) M² 257,000.00
44 Reng Rangka Baja Ringan (Polos) uk. 0.40 - 0.45 Pjg 6 m btg 52,500.00
45 Rangka baja truss (0,75-6m) btg 94,000.00
46 Rangka baja truss (0,65-6m) btg 85,000.00
47 Dinabolt bh 6,500.00

Hal - 118
HARGA SATUAN DASAR
(TIDAK TERMASUK
NO MATERIAL SATUAN
PROFIT & OVERHEAD)
(Rp)

48 L. Braket bh 6,000.00
49 Baut truss bh 550.00
50 Baut reng bh 500.00
51 Baut atap 5 cm bh 500.00
52 Alumunium Komposit + Rangka Besi M² 908,700.00
53 Alumunium Komposit Interior (1,22 x 2,44 m) Lbr 560,000.00
54 Alumunium Komposit Exterior (1,22 x 2,44 m) Lbr 815,000.00
55 Rangka Plafond Metal Furing + Pemasangan M² 130,000.00
56 Besi stainles 1" btg 119,600.00
57 Besi tempa btg 69,600.00
58 Plastik Waring Roll 325,000.00

F. BAHAN PENGGANTUNG
1 Pintu PVC untuk WC Bh 266,000.00
2 Kait angin Bh 14,400.00
3 Handle Jendela Bh 15,400.00
4 Handle Pintu Bh 170,000.00
5 Engsel jendela Bh 18,800.00
6 Engsel pintu Bh 29,000.00
7 Slot pintu Bh 18,900.00
8 Slot jendela Bh 8,800.00
9 Kunci tanam 2 slag (setaraf Belluci) Bh 180,000.00
10 Kunci tanam 1 slag besar Bh 230,000.00
11 Kunci tanam 1 slag kecil Bh 150,000.00
12 Kunci tanam antik Bh 47,500.00
13 Kunci tanam biasa Bh 55,000.00
14 Kunci silinder Bh 78,800.00
15 Door Closer Bh 250,000.00
16 Door Stoper Bh 88,750.00
17 Paku Seng Kg 35,000.00
18 Paku campuran 1" - 5 " Kg 23,000.00
19 Paku beton Kg 40,000.00
20 Paku triplek Kg 25,000.00
21 Paku GRC Kg 25,000.00
22 Paku Zincalum Kg 10,700.00
23 Paku Onduline Bh 1,300.00
24 Sekrup Onduline Bh 1,500.00
25 Sekrup Gibsum Kg 60,000.00
26 Sekrup Fixer Bh 2,500.00
27 Sekrup Steel Sheet uk. 5 x 15 mm Bh 300.00
28 Sekrup Steel Sheet uk. 5 x 25 mm Bh 300.00
29 Sekrup Steel Sheet uk. 5 x 35 mm Bh 400.00
30 Sekrup Steel Sheet uk. 5 x 45 mm Bh 500.00
31 Sekrup Steel Sheet uk. 5 x 50 mm Bh 500.00
32 Sekrup Steel Sheet uk. 5 x 55 mm Bh 600.00
33 Sekrup Steel Sheet uk. 5 x 65 mm Bh 700.00
34 Sekrup Ulir Kayu Bh 700.00
35 Paku asbes Bh 600.00
36 Sekrup Zincalume Bh 500.00
37 Pintu Tempered Polos 12 mm - uk. 87 x 213,5 cm Unit 5,500,000.00
38 Pintu Alumunium + Engsel Tanam - uk. 90 x 215 cm Unit 2,104,300.00
39 Pintu Alumunium + Engsel Kupu-kupu - uk. 90 x 215 cm Unit 1,578,300.00
40 Jendela Casement - uk. 60 x 120 cm (Lengkap - Tanpa Kaca) Unit 800,000.00

G. BAHAN ATAP
1 Sirap belian Lbr 5,300.00
2 Asbes Lbr 57,200.00
3 Eternit M² 68,400.00
4 Genteng Metal Type Permata 0.30 Lbr 63,000.00
5 Genteng Metal Type Prima 0.30 Lbr 66,600.00
6 Genteng Metal Type Royal 0.30 Lbr 66,600.00
7 Genteng Metal Type Classic 0.30 Lbr 66,600.00
8 Genteng Metal Type Permata 0.25 Lbr 51,800.00
9 Genteng Metal Type Classic 0.25 Lbr 51,800.00
10 Genteng Metal Type Royal 0.25 Lbr 51,800.00

Hal - 119
HARGA SATUAN DASAR
(TIDAK TERMASUK
NO MATERIAL SATUAN
PROFIT & OVERHEAD)
(Rp)

11 Atap Genteng Onduline Transparan 2 x 0,95 m Lbr 275,000.00


12 Atap Genteng Onduline Warna 2 x 0,95 m (merah,hijau,coklat & hitam) Lbr 173,000.00
13 Atap Genteng Onduline Warna 2 x 0,95 m (Biru /Premium) Lbr 200,000.00
14 Atap Genteng Onduvilla Warna 1,06 x 0,4 m (merah,hijau,coklat & hitam) Lbr 59,000.00
15 Atap Genteng Onduvilla Warna 1,06 x 0,4 m (teracota 3D & florentino) Lbr 54,000.00
16 Perabung Onduline Warna 90 x 50 cm (merah, coklat, hijau & hitam) Lbr 100,000.00
17 Perabung Onduline Warna 90 x 50 cm (biru/premium) Lbr 110,000.00
18 Perabung Onduline Warna 90 x 50 cm (florentino) Lbr 110,000.00
19 Siku Onduline Warna 110 x 40 cm (merah,coklat,hijau & hitam) Lbr 93,000.00
20 Apron Piece Onduvilla 102 x 14 cm Lbr 89,500.00
21 Verge Piece Onduline/Onduvilla 104 x 10,5 cm tinggi 11,4 cm Lbr 89,500.00
22 Onduband M 57,000.00
23 Atap Seng Metal Soka Abadi Lbr 92,000.00
24 Atap Seng Metal Soka Jempol Lbr 67,000.00
25 Atap Seng Metal Soka Tiara Lbr 68,000.00
26 Genteng Metal Stone ( Type Classic 0.35 ) Lbr 80,000.00
27 Genteng Metal Stone ( Type Prima 0.35 ) Lbr 80,000.00
28 Atap Metal Supersheet 0.35 (polos) M² 81,300.00
29 Atap Metal Supersheet 0.35 (colour) M² 111,900.00
30 Atap Metal Supersheet 0.25 (polos) M² 47,000.00
31 Atap Metal Supersheet 0.25 (colour) M² 70,000.00
32 Atap Trim Deck 0.3 (polos) M² 100,000.00
33 Atap Trim Deck 0.35 (color) M² 112,300.00
34 Atap polycarbonat M² 78,300.00
35 Nok bubungan genteng metal 1/2 lingkaran 0.35 (pj 40cm) Bh 46,000.00
36 Nok bubungan genteng metal stone 1/2 lingkaran 0.35 (pj 40cm) Bh 75,000.00
37 Nok bubungan genteng metal kotak 0.35 M' 50,000.00
38 Nok bubungan genteng metal stone kotak 0.35 M' 96,900.00
39 Nok bubungan Trim Deck (polos) M' 109,500.00
40 Nok bubungan Trim Deck (color) M' 123,100.00
41 Seng Gelombang Bjls 30 Lbr 72,000.00
42 Seng Gelombang Bjls 20 Lbr 55,000.00
43 Seng Plat Bjls 20 Lbr 65,000.00
44 Seng Plat Bjls 30 Lbr 80,000.00
45 Seng Plat Bjls 30 (lebar 45 cm) M' 42,500.00
46 Plat Datar Color 0.35 Lbr 55,000.00
47 Zincalume Gelombang Persegi 0.40 (polos) M² 75,900.00
48 Zincalume Gelombang Persegi 0.35 (polos) M² 73,000.00
49 Zincalume Gelombang Persegi 0.30 (polos) M² 70,000.00
50 Zincalume Gelombang Persegi 0.40(color) M² 83,800.00
51 Zincalume Gelombang Persegi 0.35 (color) M² 80,000.00
52 Zincalume Gelombang Persegi 0.30 (color) M² 55,000.00
53 Zincalume Plat 0.2 Lbr 50,000.00
54 Aluminium Foil M² 55,000.00
55 Papan Belian utk Atap uk. 1/15 pj. 50 cm Lbr 15,200.00
56 Atap Steel Sheet 0.30 lurus (silver) M 55,000.00
57 Atap Steel Sheet 0.35 lurus (silver) M 60,000.00
58 Atap Steel Sheet 0.4 lurus (silver) M 65,000.00
59 Atap Steel Sheet 0.25 lurus (biru, merah, hijau tua) M 50,000.00
60 Atap Steel Sheet 0.30 lurus (biru, merah, coklat, hijau tua, biru tua) M 57,000.00
61 Atap Steel Sheet 0.35 lurus (coklat, biru, merah, hijau muda) M 67,000.00
62 Atap Steel Sheet 0.40 lurus (biru) M 72,000.00
63 Atap Steel Sheet 0.45 lurus (biru, merah, hijau muda) M 77,000.00
64 Atap Steel Sheet 0.30 lengkung (silver) M 60,500.00
65 Atap Steel Sheet 0.35 lengkung (silver) M 66,000.00
66 Atap Steel Sheet 0.4 lengkung (silver) M 71,500.00
67 Atap Steel Sheet 0.30 lengkung (biru, merah, coklat, hijau tua, biru tua) M 62,700.00
68 Atap Steel Sheet 0.35 lengkung (coklat, biru, merah, hijau muda) M 73,700.00
69 Atap Steel Sheet 0.40 lengkung (biru) M 79,200.00
70 Atap Steel Sheet 0.45 lengkung (biru, merah, hijau muda) M 84,700.00
71 Nok/Prabung Steel Sheet 0.30 lebar 333 mm (silver) M 22,000.00
72 Nok/Prabung Steel Sheet 0.35 lebar 333 mm (silver) M 24,000.00
73 Nok/Prabung Steel Sheet 0.40 lebar 333 mm (silver) M 26,000.00
74 Nok/Prabung Steel Sheet 0.25 lebar 333 mm (biru, merah, hijau tua) M 20,000.00
75 Nok/Prabung Steel Sheet 0.30 lebar 333 mm (biru, merah, coklat, hijau tua, biru tua) M 22,800.00

Hal - 120
HARGA SATUAN DASAR
(TIDAK TERMASUK
NO MATERIAL SATUAN
PROFIT & OVERHEAD)
(Rp)

76 Nok/Prabung Steel Sheet 0.35 lebar 333 mm (coklat, biru, merah, hijau muda) M 26,800.00
77 Nok/Prabung Steel Sheet 0.40 lebar 333 mm (biru) M 28,800.00
78 Nok/Prabung Steel Sheet 0.45 lebar 333 mm (biru, merah, hijau muda) M 30,800.00
79 Nok/Prabung Steel Sheet 0.30 lebar 500 mm (silver) M 33,000.00
80 Nok/Prabung Steel Sheet 0.35 lebar 500 mm (silver) M 36,000.00
81 Nok/Prabung Steel Sheet 0.40 lebar 500 mm (silver) M 39,000.00
82 Nok/Prabung Steel Sheet 0.25 lebar 500 mm (biru, merah, hijau tua) M 30,000.00
83 Nok/Prabung Steel Sheet 0.30 lebar 500 mm (biru, merah, coklat, hijau tua, biru tua) M 34,200.00
84 Nok/Prabung Steel Sheet 0.35 lebar 500 mm (coklat, biru, merah, hijau muda) M 40,200.00
85 Nok/Prabung Steel Sheet 0.40 lebar 500 mm (biru) M 43,200.00
86 Nok/Prabung Steel Sheet 0.45 lebar 500 mm (biru, merah, hijau muda) M 46,200.00

H. BAHAN KACA
1 Kaca Polos, t = 3 mm M² 150,000.00
2 Kaca Polos, t = 5 mm M² 200,000.00
3 Kaca Polos, t = 8 mm M² 398,000.00
4 Kaca Polos, t = 12 mm M² 640,000.00
5 Kaca Rayben, t = 3 mm M² 200,000.00
6 Kaca Rayben, t = 5 mm M² 200,000.00
7 Kaca Rayben, t = 8 mm M² 550,000.00
8 Kaca Rayben, t = 12 mm M² 900,000.00
9 Kaca Cermin t = 3 mm M² 275,000.00
10 Kaca Cermin t = 5 mm M² 418,000.00
11 Kaca Repsol, t = 5 mm M² 550,000.00
12 Sealent Kg 35,000.00
13 Nako + Bingkai (80 x 15) x 10 daun polos Bh 400,000.00
14 Nako + Bingkai (80 x 15) x 10 daun rayben Bh 469,000.00
15 Kaca Es, t = 3 mm M² 275,000.00
16 Kaca Es, t = 5 mm M² 267,500.00
17 Kaca Raindown, t = 5 mm M² 550,000.00

I. BAHAN TRIPLEK
1 Triplek t = 3 mm Lbr 70,000.00
2 Teakwood t = 3 mm Lbr 140,000.00
3 Formika t = 0,03 mm Lbr 115,000.00
4 Multiplex t = 6 mm Lbr 111,000.00
5 Multiplex t = 9 mm Lbr 220,000.00
6 Multiplex t = 10 mm Lbr 278,000.00
7 Multiplek t = 12 mm Lbr 282,100.00
8 Plywood 4' x 8' x 4mm Lbr 120,000.00
9 Panel GRC 120 x 240 x 40 Lbr 79,700.00
10 GypsumBoard t = 9 mm Lbr 74,600.00
11 Super Plank 10 x 240 x 9 cm Lbr 65,000.00
12 Super Plank 20 x 240 x 9 cm Lbr 70,000.00
13 Super Plank 30 x 240 x 9 cm Lbr 110,000.00

J. BAHAN SANITASI
1 Wastafel setara Toto Bh 1,000,000.00
2 Kloset duduk monoblok Bh 2,962,700.00
3 Kloset duduk putih (setaraf TOTO) Bh 2,246,800.00
4 Kloset duduk warna (setaraf TOTO) Bh 2,500,000.00
5 Kloset jongkok (setaraf TOTO) Bh 330,000.00
6 Kloset jongkok (setaraf INA) Bh 200,000.00
7 Urinoir setaraf Toto Unit 2,000,000.00
8 Bak air fibreglass uk. 55x55x60 cm Bh 300,000.00
9 Shower Spray setara Toto Unit 350,000.00
10 Sliding rail setara Toto Unit 500,000.00
11 Floordrain stainless steel setara Toto Bh 400,000.00
12 Floordrain PVC Bh 35,000.00
13 Tempat Sabun Setara Toto Bh 120,000.00
14 Kran zink setara Toto Bh 307,000.00
15 Kitchenzink stainless steel 1 lubang Unit 650,000.00
16 Kran dinding setara Toto Bh 150,000.00
17 Kran air uk 1/2" Bh 32,500.00
18 Pipa PVC dia 1/2" AW ex Wavin Btg 23,400.00

Hal - 121
HARGA SATUAN DASAR
(TIDAK TERMASUK
NO MATERIAL SATUAN
PROFIT & OVERHEAD)
(Rp)

19 Pipa PVC dia 3/4" AW ex Wavin Btg 32,500.00


20 Pipa PVC dia 1" AW ex Wavin Btg 44,400.00
21 Pipa PVC dia 2" AW ex Wavin Btg 100,000.00
22 Pipa PVC dia 3" AW ex Wavin Btg 203,500.00
23 Pipa PVC dia 4" AW ex Wavin Btg 335,500.00
24 Pipa PVC dia 8" AW ex Wavin Btg 1,306,800.00
25 Pipa PVC dia 3/4" D ex Wavin Btg 23,500.00
26 Pipa PVC dia 1" D ex Wavin Btg 30,000.00
27 Pipa PVC dia 2" D ex Wavin Btg 61,000.00
28 Pipa PVC dia 3" D ex Wavin Btg 111,000.00
29 Pipa PVC dia 4" D ex Wavin Btg 173,300.00
30 Stop kran dia 1/2" ex onda Bh 43,000.00
31 Stop kran dia 3/4" ex onda Bh 51,200.00
32 Stop kran dia 1" ex onda Bh 115,000.00
33 Tangki air 1000 liter Bh 2,500,000.00
34 Tangki air 500 liter Bh 1,500,000.00
35 Pelampung otomatis Bh 75,000.00
36 Roof Drain Metal Bh 75,000.00
37 Septicktank Biosel kap. 6,00 m3 Unit 115,000.00
38 Mesin Jet Pump kap.250 watt Unit 1,440,000.00
39 Mesin Pompa tekan kap. 150 watt Unit 550,000.00

K. BAHAN MINYAK (TANPA KEUNTUNGAN)


1 Minyak solar industri Ltr 8,100.00
2 Bensin industri Ltr 7,400.00
3 Minyak pelumas/Oli Ltr 28,800.00
4 Minyak tanah Ltr 9,600.00
5 Gas Elpiji Refill 12 kg Kg 28,800.00
6 Sewa Molen Set 170,000.00
7 Sewa Alat Perakitan Set 70,000.00
8 Sewa Peralatan Las Set 70,000.00
9 Alat-alat bantu Set 66,400.00

L. BATU ALAM
1 Batu Andesit Ukuran 10 x 20 cm M² 170,000.00
2 Batu Andesit Ukuran 15 x 30 cm M² 200,000.00
3 Batu Andesit Ukuran 20 x 40 cm M² 230,000.00
4 Batu Andesit Ukuran 30 x 60 cm M² 260,000.00
5 Batu Candi Ukuran 10 x 20 cm M² 170,000.00
6 Batu Candi Ukuran 15 x 30 cm M² 200,000.00
7 Batu Candi Ukuran 20 x 40 cm M² 220,000.00
8 Batu Pacitoroso Ukuran 10 x 20 cm M² 190,000.00
9 Batu Pacitoroso Ukuran 15 x 30 cm M² 220,000.00
10 Batu Pacitoroso Ukuran 20 x 40 cm M² 250,000.00
11 Batu Bali Green Ukuran 10 x 20 cm M² 180,000.00
12 Batu Bali Green Ukuran 15 x 30 cm M² 200,000.00
13 Batu Bali Green Ukuran 20 x 40 cm M² 220,000.00
14 Batu Prasasti Peresmian (batu hitam) ukuran 40 x 60 buah 2,400,000.00
15 Batu Prasasti Peresmian (batu hitam) ukuran 60 x 80 buah 4,800,000.00
16 Batu Koral (batu taman) kg 14,000.00
17 Batu Granit Ukuran Lebar 60 cm M² 1,300,000.00

M. BAHAN ALAT-ALAT LISTRIK


1 Traffo HPL 400 Watt Buah 298,500.00
2 Traffo HPL 250 Watt Buah 228,000.00
3 Traffo HPL 125 Watt Buah 155,350.00
4 Traffo SON T 1000 Watt Buah 1,687,000.00
5 Traffo SON T 400 Watt Buah 462,000.00
6 Traffo SON T 250 Watt Buah 311,930.00
7 Traffo SON T 150 Watt Buah 179,000.00
8 Traffo SON T 125 Watt Buah 180,000.00
9 Traffo SON T 70 Watt Buah 120,000.00
10 Traffo Neon 40 Watt Buah 40,000.00
11 Traffo Neon 20 Watt Buah 40,000.00
12 HPL 250 Watt Buah 170,500.00

Hal - 122
HARGA SATUAN DASAR
(TIDAK TERMASUK
NO MATERIAL SATUAN
PROFIT & OVERHEAD)
(Rp)

13 HPL 125 Watt Buah 117,750.00


14 Bola SON T 1000 Watt Buah 690,000.00
15 Bola SON T 400 Watt Buah 240,000.00
16 Bola SON T 250 Watt Buah 136,000.00
17 Bola SON T 150 Watt Buah 118,800.00
18 Bola Lampu SON 70 Watt Buah 117,500.00
19 Bola Lampu HPIT 400 Watt Buah 240,000.00
20 Lampu Sorot 300 Watt (LENGKAP) Buah 250,000.00
21 SL 14 Watt Buah 29,500.00
22 SL 18 Watt Buah 41,050.00
23 SL 23 Watt Buah 47,500.00
24 TL Rina 32 Watt Buah 40,000.00
25 Bola Lampu Sorot 300 Watt Buah 32,000.00
26 Hologen 500 Watt Buah 35,500.00
27 Hologen 1.000 Watt Buah 51,250.00
28 NYMHYM 2 x 0,75 mm Meter 4,490.00
29 NYMHYM 2 x 1,5 mm Meter 7,030.00
30 Kabel 3 x 2,5 mm Meter 510,000.00
31 Kabel TC 2 x 10 mm Meter 4,200.00
32 Kabel TC 2 x 16 mm Meter 6,500.00
33 Box MCB 1 Group Buah 3,500.00
34 Box Time Swich ( Lengkap pipa optic 1,5 +Klem + Kunci ) Set 2,695,650.00
35 Box KWH Meter Uk. L 35 cm x T 50 cm x LS 25 cm Buah 781,700.00
36 Fitting Gantung Buah 4,375.00
37 Fitting Duduk Buah 13,300.00
38 Fitting Atom Buah 3,500.00
39 Fitting Gantung E 27 Buah 11,000.00
40 Fitting Duduk E 27 Buah 41,000.00
41 Full Breket Buah 17,500.00
42 Isolasi Unibel Buah 7,700.00
43 Icnitor SN 58 Buah 51,500.00
44 Inector Buah 73,500.00
45 Ignator Buah 35,000.00
46 Kap Hijau E 27 Buah 12,000.00
47 Kap Hijau E 40 Buah 16,000.00
48 Kop Skring Buah 7,000.00
49 k. Skum 10-8 Buah 1,000.00
50 MCB 1.A Buah 35,000.00
51 MCB 2.A Buah 31,600.00
52 MCB 25 A Buah 33,000.00
53 MCB 63 A Buah 62,000.00
54 MCB 40 A Buah 29,000.00
55 MCB 50 A Buah 62,000.00
56 MCB 10 A Buah 37,500.00
57 MCB 16 A Buah 44,800.00
58 MCB 6 A Buah 33,000.00
59 MCB 32 A Buah 33,000.00
60 MCB Box Buah 2,500.00
61 Multi Tester Buah 110,000.00
62 Macon Mec gmg-50 aC Buah 484,500.00
63 Magnetic Contactor 100 A Buah 672,000.00
64 NH Fuse 80 A Buah 495,000.00
65 Ornamen Pijar Buah 89,000.00
66 Obeng Plus Buah 20,000.00
67 Obeng Minus Buah 20,000.00
68 Solar Seal / Photo Seal Buah 50,000.00
69 Rangka Ring 32 Watt Buah 45,000.00
70 Rel MCB Buah 15,000.00
71 Saklar Tunggal setara Broco Buah 11,000.00
72 Saklar Tunggal setara Panasonic Buah 15,363.00
73 Saklar Double setara Broco Buah 14,000.00
74 Saklar Double setara Panasonic Buah 24,000.00
75 Saklar Engkel setara Broco Buah 17,000.00
76 Saklar Tripel setara Broco Buah 18,000.00
77 Saklar Tripel setara Panasonic Buah 40,687.00
78 Solder Pistol Buah 45,000.00
79 Solar Seal / Photo Seal Buah 56,000.00
80 Steker Arde Buah 10,000.00

Hal - 123
HARGA SATUAN DASAR
(TIDAK TERMASUK
NO MATERIAL SATUAN
PROFIT & OVERHEAD)
(Rp)

81 Steker T Buah 20,000.00


82 Sadel No. 6 Bungkus 6,500.00
83 Sadel No. 8 Bungkus 7,000.00
84 Sadel No. 9 Bungkus 7,350.00
85 Sadel No. 10 Bungkus 8,000.00
86 Sadel No. 12 Bungkus 9,500.00
87 Sadel No. 14 Bungkus 12,600.00
88 Sadel No. 19 Bungkus 18,100.00
89 Sadel No. 22 Bungkus 19,100.00
90 Stater Buah 5,500.00
91 Tang Amper Buah 1,024,000.00
92 Tang Potong Buah 31,000.00
93 Tang Kombinasi Buah 35,000.00
94 Time Swicht Theben Buah 334,250.00
95 Taping Conector 1 baut Buah 16,266.00
96 Taping Conector 2 baut Buah 24,233.00
97 Tespen Buah 17,500.00
98 Amatur Lampu Son T 250 Watt (lengkap) Set 3,856,500.00
99 Amatur Lampu Son T 150 Watt (lengkap) Set 3,304,300.00
100 Stang Ornamen Uk 2 x 1,5 meter ( lengkap Klim Tiang) Btg 530,400.00
101 Stang Ornamen Uk 2 x 2 meter ( lengkap Klim Tiang) Btg 667,800.00
102 Stang Ornamen Uk 2 x 3 meter ( lengkap Klim Tiang) Btg 739,300.00
103 Stang Ornamen Uk 2 x 4 meter ( lengkap Klim Tiang) Btg 848,700.00
104 Stang Ornamen Uk 2 x 6 meter ( lengkap Klim Tiang) Btg 934,700.00
105 Wide Klem Buah 5,800.00
106 Pole Breacket Buah 21,600.00
107 Kapasitor Buah 181,200.00
108 Kontraktor 100 A Buah 598,100.00
109 Kontraktor 80 A Buah 488,000.00
110 Kontraktor 32 A Buah 330,000.00

Hal - 124
LAMPIRAN 2 : KEPUTUSAN WALIKOTA PONTIANAK
NOMOR : ………………… TAHUN 2010
TANGGAL : ……………-…………2010

TENTANG
DAFTAR HARGA SATUAN TANAMAN HIAS
DI KOTA PONTIANAK TAHUN 2010
Periode : Januari 2010

NO JENIS BAHAN PERTAMANAN UKURAN


TINGGI DIAMETER UNIT HARGA BAHAN
(cm) (cm)
1 2 3 4 5 6

I. RUMPUT (LAWN)
1 Rumput gajah ( Axonopus sp )
a. Tandur 100 Titik/M2 M2 9,000
b. Lempeng, jarak lempeng + 2 cm 25 x 25 cm M2 31,000
2 Rumput golf (Tifton grass) Tandur 100 Titik/M2 M2 10,250
3 Rumput manila (Zoysia matrela),jrk lempeng 2 cm 25 x 25 cm M2 9,000
4 Rumput manila (Zoysia matrela) Tandur 100 Titik/M2 M2 5,000

II PENUTUP TANAH
1 Anggrek tanah (Sphatoglotis plicata), rumpun 35 - 40 2 btg, 3 anakan Polybag 8,000
2 Bayam merah (Alteanthera ficoidea), rumpun 20 - 25 1 btg/rumpun Polybag 2,000
3 Beludru coklat (Episcia reptans) 7 - 10 Tajuk 10 - 15 Polybag 3,000
4 Beludru Hijau (Episcia reptans) 7 - 10 Tajuk 10 - 15 Polybag 3,000
5 Botan (Centaurea candisina) 25 - 30 1 btg Polybag 4,500
6 Cendrawasih (Phyllantus sp) 15 - 20 Tajuk 20 - 25 Polybag 12,017
7 Cocor bebek (Kalanchoe pinnata) 15 - 20 1 btg Polybag 5,000
8 Crossandra 20 - 40 Tajuk 20 - 25 Polybag 11,000
9 Dinding ari (Hemigraphis colorata) 7 - 10 3 s/d 4 btg/rpn Polybag 10,000
10 Dracaena Tricolor 30 Polybag 17,500
11 Gandarusa 15 3 s/d 4 btg/rpn Polybag 3,500
12 Jengger ayam air mancur daun besar 15 - 20 dia. 1 btg Polybag 6,000
13 Jengger ayam air mancur daun kecil 15 - 20 dia. 1 btg Polybag 6,000
14 Jengger ayam a.m. protol besar 20 - 25 dia. Btg 1 cm Polybag 6,000
15 Jengger ayam a.m. protol kecil 20 - 25 dia. Btg 1 cm Polybag 7,000
16 Kembang coklat putih (Zyphyranthes sp) 15 - 20 Tajuk 15 - 20 Polybag 3,250
17 Kembang coklat merah muda (Zyphyranthes sp) 15 - 20 Tajuk 15 - 20 Polybag 3,250
18 Krokot (Althernantera amoenna) 10 5 btg/rpn Polybag 1,000
19 Lili paris bintang (Chlorophytum sp) 10 - 12 1 btg/rpn Polybag 3,250
20 Lili paris kasar (Ophiopogon jaburan) 20 - 25 5 s/d 7 btg/rpn Polybag 5,000
21 Lili paris kasar (Ophiopogon jaburan) 25-35 5 s/d 7 btg/rpn Polybag 10,658
22 Lili paris kucai (Chlorophytum sp) 10 3 s/d 5 btg/rpn Polybag 3,500
21 Lili paris umbi (Chlorophytum sp) 10 3 s/d 5 btg/rpn Polybag 3,250
22 Lili paris brazil (Chlorophytum sp) 15 - 20 3 s/d 5 btg/rpn Polybag 4,500
24 Mirten perak (Malphigia sp) 20 - 25 3 s/d 5 btg/rpn Polybag 12,000
25 Mirten rebah (Malphigia sp) 10 - 15 Tajuk 10 - 15 Polybag 17,500
26 Mirten tegak (Malphigia sp) 30 - 35 3 btg/rpn Polybag 20,000
27 Nanas kerang (Rhoeo discolor) 3-5 1 btg Polybag 3,250
28 Nanas merah (Ananas sp) 15-20 Tajuk 20 - 25 Polybag 4,500
28 Nanas merah (Ananas sp) 30-40 Tajuk 20 - 25 Polybag 7,500
29 Seruni rambat (Wedelia trilobata) 10 3 s/d 5 btg/rpn Polybag 11,996
30 Sutra bombai banci (Portulacca sp) 7 - 10 3 s/d 5 btg/rpn Polybag 1,500
31 Sutra bombai ungu (Portulacca sp) 7 - 10 3 s/d 5 btg/rpn Polybag 2,500
32 Tagetes (Tagetes erecta) 20 - 25 Tajuk 15 - 20 Polybag 2,500
33 Nanas kerang (Rhoeo discolor) 20 1 btg Polybag 5,000
34 Katis kodok hijau (Sansiviera sp) isi 10 10 10 btg/pot Polybag 4,750
35 Katis kodok kuning (Sansiviera sp) isi 10 10 10 btg/pot Polybag 6,250
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT HARGA BAHAN
(cm) (cm)
1 2 3 4 5 6
36 Pedang-pedangan strip kuning (Sansiviera sp) 30 - 35 5 s/d 7 btg/rpn Polybag 6,750
37 Pedang-pedangan strip hijau (Sansiviera sp) 30 - 35 5 s/d 7 btg/rpn Polybag 5,250
38 Pandan Kuning Africa 30 Polybag 10,000
39 Pangkas kuning kecil (Duranta repens) 10 3 s/d 5 btg/rpn Polybag 2,000
40 Pangkas kuning sedang (Duranta repens) 15 3 s/d 5 btg/rpn Polybag 3,250
41 Lantana Warna-Warni 15 3 s/d 5 btg/rpn Polybag 6,000
42 Taiwan Beauty bunga ungu (Cuphea sp) 25 Tajuk 15 Polybag 10,500
44 Taiwan Beauty bunga ungu (Cuphea sp) 16 Tajuk 15 Polybag 4,000
45 Cover Crop (Kacang-kacangan) 7-10 10 btg / rpn Polybag 1,500

III PERDU
1 Agave putih (Agave sp) 40 dia. Tajuk 30 Polybag 55,000
2 Agave biasa (Agave sp) 50 dia. Tajuk 40 Polybag 37,500
3 Aglonema (Aglaonema sp) 40 3 btg Polybag 30,000
4 Bilawan (Plumbago aphylia) 10 - 15 3 btg Polybag 40,000
5 Bougenvil berbunga bentukan penuh 60 dia.Tajuk 60 Polybag 125,000
6 Bougenvil hawai (Bougainvillea sp) 60 dia.Tajuk 60 Polybag 150,000
7 Bougenvil Biasa 60 dia.Tajuk 60 Polybag 50,000
8 Dendron biasa (Phillodendron sp) 15 - 20 1 btg Polybag 20,000
9 Dendrose lokal Jkt Merah 20 - 40 dia.Tajuk 10-15 Polybag 17,500
10 Balanceng india (Dieffenbachia sp) 30 3 daun/btg Polybag 22,500
11 Dracena tricolor (Dracena sp) 30 dia. Tajuk 30 Polybag 15,000
12 Kacapiring (Gardenia sp) 50 dia. Tajuk 30 Polybag 12,500
13 Pisang-pisangan (Heliconia sp) bunga
kuning / merah 50 2 s/d 3 btg/rpn Polybag 5,000
14 Spatiphylum lokal (Spatiphylum sp) 15 - 20 3 bth/pot Polybag 11,000
15 Spatiphylum luar (Spatiphylum sp) 15 - 20 3 btg Polybag 25,000
16 Beringin putih kecil (Ficus hybrida) ex Jkt 30 diaTajuk 15 -20 Polybag 145,000
17 Kamboja jepang (Adenium cutanium) bercabang 30 dia.Tajuk 15-20 Polybag 27,500
18 Kamboja putih 100 dia. Btg 3 Polybag 100,000
19 Kamboja rantai 100 dia. Btg 3 Polybag 90,000
20 Kana (Canna hibrida) 40 2 s/d 3 btg/rpn Polybag 10,000
21 Kastuba (Euphorbia pulcherima) 25 - 30 dia. Tajuk 30 Polybag 35,000
22 Kembang sepatu putih (Hibiscus mutabilis) 30 1 btg/pot Polybag 27,500
23 Lusiana 50 - 75 dia. Btg 1,5 Polybag 22,500
24 Mawar putih (Rosa Hybrida) 25 dia.Tajuk15 -20 Polybag 5,000
25 Mawar merah (Rosa Hybrida) 30 dia.Tajuk 15-20 Polybag 5,000
26 Melati costa (Jasminum sp) 50 2 anakan/rpn Polybag 22,500
27 Melati Gambir (Jasminum sp) 50 2 anakan/rpn Polybag 22,500
28 Melati Malaysia Polybag 22,500
29 Oleander (Nerium indicum) 30 1 rpn Polybag 11,000
30 Pepayungan (Cyperus altemifolius) 60 5 anakan/pot Polybag 8,500
31 Pandan hijau jepang (Pandanus sp) 50 1 rpn Polybag 35,000
32 Pandan kuning afrika 50 1 rpn Polybag 37,500
33 Pangkas Hijau 10 3 s/d 5 btg/rpn Polybag 1,500
33 Pangkas Hijau 20-40 3 s/d 5 btg/rpn Polybag 2,250
34 Variegata Polybag 15,000
34 Sambang darah 50 dia. Tajuk 30 Polybag 40,000
35 Siklok Polybag 92,500
36 Wali songo daun kecil (Scheffera sp) 50 1 btg/pot Polybag 20,000
37 Soka bangkok (Ixora sp) 20 1 btg/pot Polybag 6,500
38 Soka jepang bunga orange (Ixora sp) 20 1 btg/pot Polybag 4,000
39 Soka philipina (Ixora sp) 20 1 btg/pot Polybag 4,000
40 Soka siantan (Ixora tricia) 20 1 btg/pot Polybag 4,000
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT HARGA BAHAN
(cm) (cm)
1 2 3 4 5 6
41 Soka singapura (Ixora cocineae) bunga
putih, pink 30 1 btg/pot Polybag 4,000
42 Soka jawa/hawai (Ixora sp) 30 1 btg/pot Polybag 5,000
43 Terang bulan daun putih/kuning (Thitonia sp) 20 3 s/d 5 btg/rpn Polybag 6,000
44 Tombak raja (Yucca gloriosa) 40 3 s/d 5 btg/rpn Polybag 52,500
45 Tapak dara 10 - 15 3 s/d 5 btg/rpn Polybag 3,500
46 Pangkas Hijau 3-5 3 s/d 5 btg/rpn Polybag 1,500
47 Pangkas Hijau 20 4 s/d 7 btg/rpn Polybag 2,500
48 Bayam Merah 10 - 15 3 s/d 5 btg/rpn Polybag 2,000
49 Soka Merah 20 1 btg/pot Polybag 6,500
50 Bawang-bawangan 15-20 f5 s/d 7 btg/rpn Polybag 5,050
51 Bawang-bawangan 20-25 f5 s/d 7 btg/rpn Polybag 6,000
52 Veberia Polybag 7,500
53 Vinolia 20-30 5 s/d 10btg/rpn Polybag 6,000
54 Vinolia 10-15 2 s/d 4 btg/rpn Polybag 5,750
55 Vinolia 35-40 12sd 20 btg/rpn Polybag 6,500
56 Variegata Polybag 15,000
57 Aires Polybag 4,950
58 Ketela Merah 10 1sd 2 btg/rpn Polybag 3,650
59 Kana Presiden 15 - 20 1sd 2 btg/rpn Polybag 5,000

IV TANAMAN PAGAR
1 Kedondong laut (Nothopanax sp) 30-65 3 s/d 4 btg/rpn Polybag 6,000
2 Kedondong laut (Nothopanax sp) 60 - 75 3 s/d 4 btg/rpn Polybag 8,750
3 Kemuning (Murraya paniculata) 75 1 btg/rpn Polybag 35,000
4 Lantana pagar (Lantana camara) 30 1rpn Polybag 17,500
5 Mangkokan (Nothopanax sp) 50 3 s/d 4 btg/rpn Polybag 15,000
6 Mirten pagar (Malphigia sp) 50 3 s/d 4 btg/rpn Polybag 15,000
7 The-tehan tinggi (Durantha repens) 30 3 s/d 4 btg/rpn Polybag 13,500
8 The-tehan tinggi (Durantha repens) 50 3 s/d 4 btg/rpn Polybag 23,500
9 The-tehan tinggi (Durantha repens) 70 3 s/d 4 btg/rpn Polybag 30,000
10 Krokot 15 Polybag 1,008

V TANAMAN MERAMBAT
1 Air mata pengantin ( Antigonon leptapus) 30 dia. Tajuk 430 Polybag 40,000
2 Air mata pengantin ( Antigonon leptapus) 50 dia. Tajuk 40 Polybag 47,500
2 Alamanda (Alamanda cathartica) 30 dia. Tajuk 20 Polybag 12,500
3 Alamanda (Alamanda cathartica) 50 dia. Tajuk 40 Polybag 15,000
4 Arabidea (Arabidea sp) 40 dia. Tajuk 30 Polybag 50,000
5 Flame of irian (Orange) 40 dia. Tajuk 30 Polybag 35,000
6 Kembang kelinci (Ipomea sp) 40 dia. Tajuk 30 Polybag 40,000
7 Kembang sungsang (Gloriosa superba) 30 dia. Tajuk 20 Polybag 40,000
8 Lantana rambut ungu (Lantana sp) 20 3 s/d 4 btg/rpn Polybag 7,500
9 Pasiflora 60 dia. Tajuk 40 Polybag 20,000
10 Sirih Gading daun strip kuning (Scindapsus sp) 30 3 s/d 4 btg/rpn Polybag 10,000
11 Sthephanot bunga putih
(Sthepanothis floribunda) 30 dia. Tajuk 40 Polybag 30,000
12 Nona Makan Sirih 30 Polybag 15,000
13 Ubi rambat Kuning 30 Polybag 2,500

VI TANAMAN HIAS
1 Anjuang hijau (Dracaena sp) 60 dia. Tajuk 40 Polybag 10,000
2 Anjuang kribo (Dracaerna sp) 60 dia. Tajuk 40 Polybag 11,000
3 Anjuang kuning (Dracaerna sp) 60 dia. Tajuk 40 Polybag 12,500
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT HARGA BAHAN
(cm) (cm)
1 2 3 4 5 6
4 Anjuang merah (Cordelyne terminalis) 40 dia. Tajuk 20 Polybag 8,000
5 Anjuang merah (Cordelyne terminalis) 60 dia. Tajuk 40 Polybag 11,000
6 Anjuang merah (Cordelyne terminalis) 80 dia. Tajuk 50 Polybag 15,000
7 Anjuang suji (Dracaena sp) 60 dia. Tajuk 40 Polybag 13,500
8 Azalea (Azalea sp) 50 dia. Tajuk 40 Polybag 25,000
9 Bakung kecil (Hymenochalys sp) 20 dia. Tajuk 40 Polybag 5,500
10 Beringin bonsai (Ficus benjamina) 100 - 200 dia. Tajuk 100 Polybag 225,000
11 Beringin bonsai bentukan (Ficus benjamina) 100 - 200 dia. Tajuk 100 Polybag 375,000
12 Beringin bonsai putih (Ficus benjamina) 250 dia. Tajuk 100 Polybag 1,000,000
13 Bonsai serut 151 - 200 dia. Tajuk 100 Polybag 2,500,000
14 Nusa indah merah/putih (Nussaenda sp) 50 dia. Tajuk 40 Polybag 20,000
15 Rambusa 50 Polybag 30,000
16 Pakis kelabang kuning (Neprolephis sp) 40 5 s/d 7 btg/rpn Polybag 10,000
17 Pakis krol (Neprolephis sp) 40 5 s/d 7 btg/rpn Polybag 12,500
18 Pakis monyet (Alsophila glauca) 150 - 200 dia. Tajuk 40 Polybag 200,000
19 Pisang kipas (Ravanela madagaskariensis) 200 - 250 dia. Btg 10 Polybag 475,000
20 Puring bor (Codiaeum sp) 75 dia. Tajuk 30 Polybag 20,000
21 Puring buntut (Codiaeum sp) 75 dia. Tajuk 30 Polybag 20,000
22 Puring gelatik (Codiaeum sp) 75 dia. Tajuk 30 Polybag 20,000
23 Puring jet (Codiaeum sp) 40 dia. Tajuk 20 Polybag 14,500
24 Puring jet (Codiaeum sp) 75 dia. Tajuk 30 Polybag 30,000
25 Puring ketapang (Codiaeum sp) 50 dia. Tajuk 30 Polybag 20,000
26 Puring nuri (Codiaeum sp) 60 dia. Tajuk 30 Polybag 20,000
27 Puring Kuning 20 dia. Tajuk 30 Polybag 7,500
28 Siklok dia. Btg 5 Polybag 100,000
29 Sikas/Pakis haji halus (Cycas revoluta) 80 dia. Btg 7,5 Polybag 900,000
30 Sikas diameter tajuk daun (Cycas sp) 100 dia. Btg 10 Polybag 1,000,000
31 Sikas medan (Cycas sp) 100 dia. Btg 10 Polybag 1,350,000
32 Sikas/pakis haji kasar (Cycas rumpi) 50 - 100 dia. Btg 7,5 Polybag 125,000
33 Kamboja kuning (Bali) tinggi (Plumeria sp) 150 - 200 dia. Btg 3 Polybag 400,000
34 Kamboja orange tinggi (Plumeria sp) 150 - 200 dia. Btg 3 Polybag 300,000
35 Lidah Buaya Besar 10-25 2-3 btg/pot Polybag 40,000
36 Lidah Buaya Kecil 50 5-7 btg/pot Polybag 15,000

VII PALEM
1 Kelapa gading (Cocos capitata) 200 - 250 dia. Btg 20 Phn 450,000
2 Kelapa sawit (Elais guineensis) 200 - 250 dia. Btg 40 Phn 450,000
3 Kelapa sayur (Cocos nucifera) 200 - 250 dia. btg 30 Phn 175,000
4 Kurma (Phoenix daetilifera) 100 dia. btg 30 Phn 400,000
5 Kurma (Phoenix daetilifera) >200 dia. Btg 40 Phn 3,500,000
6 Lontar (Borassus flabefiter) 300 dia. Btg 25 Phn 400,000
7 Palm anggur (Lalania loglgessu) 100 dia. Btg 15 Phn 150,000
8 Palm alexander 150 dia. Btg 10 Phn 125,000
9 Palm botol 150 - 200 dia. btg 30 Phn 300,000
10 Palm camedoria 100 3 s/d 5 btg/rpn Phn 110,000
11 Palm camedoria 200 3 s/d 5 btg/rpn Phn 300,000
12 Palm ekor tupai 50-75 Phn 45,000
13 Palm ekor tupai 200 dia. Btg 15 Phn 225,000
14 Palm jepang (Ptychosperma macarthurii) 100 - 150 5 s/d 7 btg/rpn Rmp 110,000
15 Palm jepang (Ptychosperma macarthurii) 150 - 250 5 s/d 7 btg/rpn Rmp 250,000
16 Palm kol (Licuala grandis) 100 dia. Btg 10 Phn 65,000
18 Palm kuning (Chrysalidocarpus lutescens) 50 - 100 3 s/d 5 btg/rpn Phn 42,500
19 Palm kuning (Chrysalidocarpus lutescens) 100 - 150 5 s/d 7 btg/rpn Rmp 125,000
20 Palm korembusa 50 dia. Btg 5 Phn 40,000
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT HARGA BAHAN
(cm) (cm)
1 2 3 4 5 6
21 Palm korembusa 100 dia. Btg 7 Phn 60,000
22 Palm korembusa >200 dia. Btg 10 Phn 70,000
23 Palm merah (Cyrtotachis lakka) 150 - 200 3 s/d 5 btg/rpn Phn 110,000
24 Palm merah (Cyrtotachis lakka) 300 - 350 5 s/d 7 btg/rpn Rmp 325,000
25 Palm phoeniks (Phoenix sp) 75 - 100 dia. Btg 8 Phn 175,000
26 Palm phoeniks (Phoenix sp) 150 - 200 dia. Btg 10 Phn 375,000
26 Palm putri 50 Phn 45,000
27 Palm putri 100-150 dia. Btg 10 Phn 140,000
28 Palm putri 150 - 200 dia. Btg 10 Phn 300,000
29 Palm pigni (Phoenix canariensis) 100 - 150 dia. Btg 10 Phn 8,000,000
30 Palm raja (Oredoxa regia) 100 - 200 dia. Btg 20 Phn 150,000
31 Palm raja (Super oredoxa regia) 200 - 300 dia. Btg 25 Phn 425,000
32 Palm ratu 100 - 150 dia. Btg 10 Phn 80,000
33 Palm sadeng (Livistonia rotundifolta) 50 dia. Btg 5 Phn 62,500
34 Palm saderi (Caroutamiti) 150 dia. Btg 8 Phn 70,000
35 Palm seledri tunggal tinggi 150 dia. Btg 8 Phn 150,000
36 Palm seledri tunggal putih 200 dia. Btg 8 Phn 400,000
37 Palm udang 50 3 s/d 5 btg/rpn Phn 35,000
38 Palm waregu (Rhapis excelsa) 150 5 s/d 7 btg/rpn Rmp 50,000
39 Pinang sirih (Areca catechu) 200 dia. Btg 10 Phn 250,000

VIII BAMBU DAN CEMARA


1 Bambu china (Bambussa vulgaris) 50 5 s/d 7 btg/rpn Dpr 45,000
2 Bambu daging (Bambussa venticossa) 150 5 s/d 7 btg/rpn Dpr 75,000
3 Bambu jepang (Phyliastachis aurea) 200 5 s/d 7 btg/rpn Dpr 67,500
4 Bambu kuning (Bambussa vulgaris) 150 5 s/d 7 btg/rpn Dpr 235,000
5 Cemara angin (Casuarina avisatifollia) 200 dia. Btg 4 Phn 200,000
6 Cemara gembel (Cupressus papuana) 150 dia. Btg 4 Phn 50,000
7 Cemara halus (Araucaria cuninghamii) 150 dia. Btg 4 Phn 75,000
8 Cemara kipas 100 - 150 dia. Btg 4 Phn 150,000
9 Cemara kuning daun emas (Cupressus sp) 150 dia. Btg 4 Phn 550,000
10 Cemara lilin 100 dia. Btg 3 Phn 52,500
11 Cemara laut (Casuarina aquasetifolia) 150 dia. Btg 4 Phn 150,000
12 Cemara natal (Cupressus sp) 75 dia.tajuk 50 Phn 62,500
13 Cemara norfolk (Araucaria sp) 75 dia.tajuk 50 Phn 62,500
14 Cemara norfolk (Araucaria sp) 100 - 150 dia.tajuk 60 Phn 150,000
15 Cemara norfolk (Araucaria sp) 400 - 500 dia.tajuk 200 Phn 1,250,000
16 Cemara pipa mas (Compressus sp) 75 dia.tajuk 40 Phn 75,000
17 Cemara tiang 100 - 140 dia. Btg 3 Phn 77,500
18 Pinus (Pinus merkusii) 200 dia. Btg 4 Phn 275,000
19 Pinus (Pinus merkusii) 300 dia. Btg 5 Phn 400,000

IX TANAMAN PEMIKAT BURUNG


1 Aren (Arenga catecu) 100 dia. Btg 3 Phn 275,000
2 Belimbing (Averhoa carambola) 75 dia. Btg 3 Phn 57,500
3 Bintaro 50 dia. Btg 3 Phn 20,000
4 Bintaro 100 dia. Btg 3 Phn 40,000
5 Bintaro 150 dia. Btg 4 Phn 70,000
6 Buni (Atidesmabunius) 200 - 300 dia. Btg 5 Phn 80,000
7 Buni (Atidesmabunius) 400 - 500 dia. Btg 10 Phn 250,000
8 Cermai 50-100 dia. Btg 5 Phn 35,000
9 Duku condet (Lansium domisticum) 100 dia. Btg 3 Phn 75,000
10 Durian (Durio zibenthinus) 150 dia. Btg 4 Phn 175,000
11 Gatet 200 - 300 dia. Btg 5 Phn 90,000
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT HARGA BAHAN
(cm) (cm)
1 2 3 4 5 6
12 Gowok (Eugenia polychephalum) 100 dia. Btg 3 Phn 40,000
13 Jambu air (Eugenia aquea) 100-150 dia. Btg 5 Phn 61,750
14 Jambu air (Eugenia aquea) 200-300 dia. Btg 10 Phn 300,000
15 Jambu bol (Eugenia malaccensis) 100 dia. Btg 3 Phn 175,000
16 Jambu mawar (Eugenia jambos) 100 dia. Btg 3 Phn 50,000
17 Kaliandra (Caliandra callothyrsus) 100 dia. Btg 3 Phn 40,000
18 Kantil (Michelia champaca) 100 dia. Btg 3 Phn 65,000
19 Kapilayu 100 dia. Btg 3 Phn 44,000
20 Kawista 200 - 300 dia. Btg 5 Phn 99,000
21 Kecapi (Sandoricum koetjape) 150 dia. Btg 4 Phn 341,000
22 Kecubung 100 dia. Btg 3 Phn 77,000
23 Kedondong (Spondias pinnata) 150 - 200 dia. Btg 4 Phn 165,000
24 Kemang (Baccaurea dulcis) 100 - 150 dia. Btg 3 Phn 33,000
25 Kenanga (Cananga odorata) 50 dia. Btg 3 Phn 52,250
26 Kepel (Stelechocarpus burahol) 100 dia. Btg 3 Phn 38,500
27 Kersen/serry 150 dia. Btg 4 Phn 132,000
28 Kesah 150 dia. Btg 4 Phn 88,000
29 Ketapang (Terminalia cattapa) 150 dia. Btg 4 Phn 137,500
30 Kelengkeng 100 dia. Btg 3 Phn 164,340
31 Kluwih 150 - 200 dia. Btg 4 Phn 27,500
32 Kosambi 100 dia. Btg 3 Phn 16,500
33 Lobi-lobi (Flacourtia inermis) 150 dia. Btg 4 Phn 38,500
34 Melinjo (Gnetum gnemon) 200 dia. Btg 4 Phn 110,000
35 Menteng (Baccaurea dulcis) 200 dia. Btg 4 Phn 99,000
36 Mindi 100 dia. Btg 3 Phn 38,500
37 Nam-nam 200 dia. Btg 5 Phn 93,500
38 Nangka (Artocarpus heterophyllus) 100 dia. Btg 3 Phn 121,000
39 Pala 200 - 300 dia. Btg 5 Phn 170,500
40 Petai 200 - 300 dia. Btg 5 Phn 165,000
41 Rambutan 50 dia. Btg 3 Phn 22,000
42 Rukem 100 dia. Btg 3 Phn 33,000
43 Sirsak 50-100 dia. Btg 5 Phn 38,500
44 Sawo kecik (Manilkara kauki) 100 dia. Btg 4 Phn 66,000
45 Sawo kecik (Manilkara kauki) 200 dia. Btg 4 Phn 220,000
46 Serikaya 50 dia. Btg 3 Phn 66,000
47 Yangliu 150 - 200 dia. Btg 4 Phn 165,000
48 Maja 200 dia. Btg 5 Phn 99,000

X BUNGA POTONG
1 Amarilis (Amarylidaceae) 1 Tangkai 17,875
2 Anggrek macan (Arrachnis sp) 1 Tangkai 275,000
3 Anyelir 1 Tangkai 13,750
4 Apple blossom 1 Tangkai 11,000
5 Aster (Asteraceae sp) 1 Tangkai 15,125
6 Anggrek Dendrobium 1 Tangkai 68,750
7 Gladiol 1 Tangkai 13,750
8 Golden shower 1 Tangkai 55,000
9 Krisan (Chrysanthemum llini) 1 Tangkai 16,500
10 Mawar 1 Tangkai 5,500

XI TANAMAN TEDUH (INDOOR PLANT)


1 Anggrek bulan 40 -50 3 s/d 5 btg/rpn Polybag 110,000
2 Anggrek cathalea 40 -50 3 s/d 5 btg/rpn Polybag 82,500
3 Anggrek douglas kecil 40 -50 3 s/d 5 btg/rpn Polybag 25,850
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT HARGA BAHAN
(cm) (cm)
1 2 3 4 5 6
4 Apple blossom 30 - 40 Polybag 55,000
5 Asparagus 30 - 40 dia. Tajuk 20 Polybag 22,000
6 Begonia daun besar 40 -50 dia. Tajuk 20 Polybag 24,750
7 Begonia daun Kecil 40 -50 dia. Tajuk 20 Polybag 24,750
8 Begonia Hijau 40-50 dia. Tajuk 20 Polybag 24,750
9 Begonia perak 40 -50 dia. Tajuk 20 Polybag 23,100
10 Belanceng bintik 40 -50 4 s/d 5 dn/pot Polybag 165,000
11 Belanceng putih 40 -50 4 s/d 5 dn/pot Polybag 22,000
12 Golden shower 50 dia. Tajuk 20 Polybag 44,000
13 Gandasari 30 - 40 dia. Tajuk 15 Polybag 22,000
14 Hortensia 30 - 40 dia. Tajuk 30 Polybag 33,000
15 Kembang kancing 30 - 40 dia. Tajuk 20 Polybag 11,000
16 Kencuran 30 - 40 dia. Tajuk 20 Polybag 11,000
17 Krisdoren 30 - 40 dia. Tajuk 15 Polybag 16,500
18 Kuping gajah 30 - 40 4 s/d 5 dn/pot Polybag 38,500
19 Kuping keledai 30 - 40 4 s/d 5 dn/pot Polybag 49,500
20 Maranta macan 30 - 40 dia. Tajuk 25 Polybag 24,750
21 Maranta batik 30 - 40 dia. Tajuk 25 Polybag 22,000
22 Maranta buntut ayam 30 - 40 dia. Tajuk 25 Polybag 27,500
23 Maranta keris 30 - 40 dia. Tajuk 25 Polybag 22,000
24 Maranta sepat 30 - 40 dia. Tajuk 25 Polybag 22,000
25 Meranti bintik 40 -50 dia. Tajuk 20 Polybag 22,000
26 Meranti kol 40 -50 dia. Tajuk 20 Polybag 22,000
27 Meranti mas koki 40 -50 dia. Tajuk 20 Polybag 22,000
28 Meranti pisang 40 -50 dia. Tajuk 20 Polybag 22,000
29 Monstera 50 - 75 4 s/d 5 dn/pot Polybag 11,000
30 Mutiara 40 -50 dia. Tajuk 20 Polybag 5,500
31 Pacing 40 -50 dia. Tajuk 20 Polybag 5,500
32 Dona Carmen 40-50 Polybag 41,250
33 Sisik Naga 30-40 Polybag 55,000
34 Palesota 20-30 Polybag 60,500
35 Diefenbachia 30-40 Polybag 82,500
36 Chiangmai 20-30 Polybag 44,000
37 Chiangmai balon 20-30 Polybag 96,750
38 Pilodendron dia. Tajuk 15 Polybag 8,250
39 Sabrina ungu 20 - 30 dia. Tajuk 15 Polybag 5,500
40 Bambu China 20-30 dia. Tajuk 20 Polybag 16,500
41 Sirih Gading 40 -50 dia. Tajuk 20 Polybag 16,500
42 Sri rejeki 30 - 40 4 s/d 5 dn/pot Polybag 22,000
43 Supelir foster kasar 30 - 40 dia. Tajuk 15 Polybag 27,500
44 Supelir halus 30 - 40 dia. Tajuk 15 Polybag 27,500
45 Tanduk rusa 40 -50 dia. Tajuk 20 Polybag 44,000
46 Walisongo biasa 50 - 100 dia. Btg 2 Polybag 44,000
47 Walisongo kuning 100 - 150 dia. Btg 3 Polybag 137,500
XII POHON PENEDUH
1 Angsana (Pterocarpus indicus) 100 - 200 dia. Btg 3 Phn 100,100
2 Asem Keranji (Pithecelluobium dulce) 150 - 200 dia.Btg 2,5s/d 4 Phn 324,500
3 Asem (Tamarindus indica) 150 - 200 dia.Btg 2,5s/d 4 Phn 143,000
4 Biola cantik 10 - 25 Phn 35,750
5 Bumi 10 - 25 Phn 10,100
6 Batavia 100 dia. Btg 5 Phn 71,500
7 Beringin (Ficus benjamina) 150 - 200 dia.Btg 2,5s/d 4 Phn 393,250
8 Beringin (Ficus benjamina) 200 - 300 dia. Btg 4 s/d 5 Phn 572,000
9 Beringin putih 200 dia. Btg 3,5 Phn 1,430,000
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT HARGA BAHAN
(cm) (cm)
1 2 3 4 5 6
10 Biola cantik (Ficus pandurata) 150 - 250 dia.Btg 2,5s/d 4 Phn 286,000
11 Bisbul (Diospyros discolor) 100 - 200 dia. Btg 3 Phn 28,600
12 Bunga kupu-kupu (Bauhunia purpurea) 400 - 500 dia.Btg 8s/d 10 Phn 429,000
13 Bunga saputangan(Amherstia nobilis) 0,50-100 dia. Btg 2 Phn 154,200
14 Bunga saputangan(Amherstia nobilis) 250-300 dia. Btg 3,5 Phn 171,600
16 Bungur (Lagerstromea loudonii) 50-100 Phn 71,500
17 Bungur (Lagerstromea loudonii) 100-150 dia. Btg 3,5 Phn 180,753
18 Bungur (Lagerstromea loudonii) 150 - 250 dia. Btg 3,5 Phn 214,500
19 Cassia golden 50-100 dia. Btg 3 Phn 57,475
20 Cassia golden 150-175 dia. Btg 3 Phn 57,600
21 Cassia golden 150-200 dia. Btg 3 Phn 78,650
22 Cassia sp 200 - 300 dia. Btg 4 s/d 5 Phn 85,800
23 Cempaka kuning (Michelia champaca) 300 - 400 dia. Btg 5 s/d 8 Phn 128,700
24 Ceremai 400 - 500 dia.Btg 8 s.d 10 Phn 321,750
25 Dadap hutan (Erythrina sp) 300 - 400 dia. Btg 5 s/d 8 Phn 250,250
26 Dadap kuning (Erythrina veriegata sp) 300 - 400 dia. Btg 5 s/d 8 Phn 286,000
27 Dadap kuning (Erythrina veriegata sp) 100 - 200 dia. Btg 5 s/d 8 Phn 143,000
28 Dadap merah (Erythrina christagali 150 - 200 dia. Btg 3,5 Phn 250,250
29 Dadap merah (Erythrina christagali 300 - 400 dia. Btg 5 s/d 8 Phn 572,000
30 Sungkai 50 - 100 Phn 67,100
31 Sungkai 150 Phn 357,500
31 Damar (Agathis alba) 500 - 700 dia. Btg > 10 Phn 643,500
32 Flamboyan (Delonix regia) 150 dia. Btg 2,5 Phn 143,000
33 Gemelina 300 dia. Btg 5 Phn 128,700
34 Glauka 100 - 150 dia. Btg 3 Phn 50,050
33 Glodogan 10 - 25 Phn 7,150
34 Glodogan (Polyalthea longifolia) 100-150 dia. Btg 3,5 Phn 151,250
35 Glodogan (Polyalthea longifolia) 150 - 200 dia. Btg 3,5 Phn 178,750
36 Glodogan (Polyalthea longifolia) 200 - 300 dia. Btg 4 s/d 5 Phn 286,000
37 Glodogan tiang (Sarracca sp) 50 Phn 14,300
38 Glodogan tiang (Sarracca sp) 150 - 300 dia. Btg 4 Phn 178,750
39 Glodogan tiang (Sarracca sp) 400 - 500 dia.Btg 8 s.d 10 Phn 321,750
40 Jatimas 200 - 300 dia. Btg 4 s/d 5 Phn 286,000
41 Jakaranda (Jacaranda acutifolia) 150 - 200 dia. Btg 3,5 Phn 50,050
42 Johar (Cassia siamea) 150 dia. Btg 3 Phn 107,250
43 Kamboja putih ( Plumeria rubra) 200 - 300 dia. Btg 4 s/d 5 Phn 286,000
44 Kamboja rantai 300 - 400 dia. Btg 5 s/d 8 Phn 1,144,000
45 Karet kebo (Ficus elastica) 100 dia. Btg 3 Phn 35,750
46 Kasia bunga kuning (Cassia multijuga) 150 - 200 dia. Btg 3,5 Phn 171,600
47 Kastuba (Euphorbia pulcherrima) 200 - 300 dia. Btg 4 s/d 5 Phn 357,500
48 Kayu manis (Cinnamon bumanni) 200 dia. Btg 3,5 Phn 100,100
49 Kayu manis (Cinnamon bumanni) 400 - 600 dia. Btg 8s.d10 Phn 193,050
50 Kayu putih (Maleucaa leucadendron) 200 - 300 dia. Btg 4 s/d 5 Phn 85,800
51 Kembang kupu-kupu (Bauhinia pupurea) 100-150 dia. Btg 3,5 Phn 121,000
52 Kembang kupu-kupu (Bauhinia pupurea) 150 - 200 dia. Btg 3,5 Phn 181,500
53 Kembang merak (Caesalpina pulcherrima) 100-150 dia. Btg 3 Phn 90,750
54 Kembang merak (Caesalpina pulcherrima) 200 dia. Btg 3 Phn 181,500
55 Kembang sepatu kuning (Hibiscus hybridus) 100 - 200 dia. Btg 3,5 Phn 214,500
56 Kenari (Canarium commune) 100 - 150 dia. Btg 3 Phn 71,500
57 Kenari (Canarium commune) 300 - 400 dia. Btg 5 s/d 8 Phn 171,600
58 Ketapang (Terminalia catappa) 150 - 200 dia. Btg 3,5 Phn 321,750
59 Ketapang (Terminalia catappa) 500 - 600 dia. Btg > 10 Phn 643,500
60 Kepuh 300 - 400 dia. Btg 5 s/d 8 Phn 100,100
61 Kiara payung (Filicium decipiens) 150 - 200 dia. Btg 3,5 Phn 143,000
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT HARGA BAHAN
(cm) (cm)
1 2 3 4 5 6
62 Pucuk Merah Phn 80,000
63 Kurma 50 dia. Btg 3 Phn 214,500
64 Lampeni 150 - 200 dia. Btg 3,5 Phn 78,650
65 Mahoni (Swietania mahagoni) 20-40 dia. Btg 2 s/d 3 Phn 101,875
66 Mahoni (Swietania mahagoni) 30-50 dia. Btg 5 s/d 8 Phn 121,000
67 Mahoni (Swietania mahagoni) 50-75 dia. Btg 5 s/d 8 Phn 143,000
68 Mahoni diameter (Swietania mahagoni) 200 - 300 dia. Btg 4 s/d 5 Phn 214,500
69 Mangga (Mangifera indica) 500 - 800 dia. Btg > 10 Phn 2,145,000
70 Mangga Mardi Malaysia Phn 178,750
71 Sawo manila Phn 178,750
72 Jeruk Sambal calung Phn 28,600
73 Lengkeng Diamond Phn 89,375
74 Kedondong bangkok Phn 117,975
75 jambu Air bangkok Phn 107,250
76 jambu Batu Merah Phn 46,475
77 Matoa irian (Pometia pinata) 300 - 400 dia. Btg 5 s/d 8 Phn 1,101,100
78 Pucuk Merah 75-100 dia. Btg 5 s/d 8 Phn 137,500
79 Pule (Alsonia scholaris) 600 - 700 dia. Btg > 10 Phn 572,000
80 Salam 50 - 100 dia. Btg 3 Phn 71,500
81 Salam 10 - 25 Phn 42,900
82 Sikat botol 200 - 300 dia. Btg 4 s/d 5 Phn 357,500
83 Santorium 500 - 600 dia. Btg > 10 Phn 572,000
84 Sawo duren (Chrysophillium cainito) 150 - 200 dia. Btg 3,5 Phn 250,250
85 Sawo kecik (Chrysophillium sp) 200 dia. Btg 3,5 Phn 357,500
86 Sono keling/Sengon (Abaziafalcata) 150 - 200 dia. Btg 3,5 Phn 85,800
87 Spathodea campanulata 150 - 200 dia. Btg 3,5 Phn 57,200
88 Spathodea campanulata 500 - 600 dia. Btg > 10 Phn 643,500
89 Tabebuia 100 - 200 dia. Tajuk 50 - 70 Phn 15,250
90 Tanjung (Mimusops elengi) 10 - 25 Phn 17,875
91 Tanjung (Mimusops elengi) 60 -100 Phn 66,000
92 Tanjung (Mimusops elengi) 100-150 Phn 79,860
93 Tanjung (Mimusops elengi) 150-200 dia. Btg 3,5 Phn 95,835
94 Tanjung (Mimusops elengi) 200-250 dia. Btg 5 s/d 7 Phn 181,500
95 Tanjung (Mimusops elengi) 200 - 300 dia. Btg 4 s/d 5 Phn 286,000
96 Sirsak Madu 150 -200 dia. Btg 3,5 Phn 89,375
97 Melinjo 150 - 200 dia. Btg 3,5 Phn 121,550
98 Mahkota Dewa 150 - 200 dia. Btg 3,5 Phn 143,000
99 Trembesi (Samanea saman) 10 - 25 Phn 58,650
100 Trembesi (Samanea saman) 200 dia. Btg 3,5 Phn 135,850
101 Trembesi (Samanea saman) 400 - 500 dia. Btg 8s.d 10 Phn 217,950
102 Trembesi (Samanea saman) 600 - 700 dia. Btg > 10 Phn 500,500
103 Trenggulin (Cassia fistula) 50 - 150 dia. Btg 3 Phn 42,900
104 Walisongo (Alithurium macrolobium) 50 - 100 dia. Btg 3 Phn 107,250
104 Walisongo (Alithurium macrolobium) 200 dia. Btg 3,5 Phn 321,750
105 Walisongo (Alithurium macrolobium) 300 dia. Btg 5 Phn 500,500
106 Waru (Hibiscus tiliaceus) 500 - 600 dia. Btg > 10 Phn 500,500
107 Yangliu (Salyx babylonia) 150 - 200 dia. Btg 3,5 Phn 214,500
XIII BIJI
1 Bixa (Bixaceae sp) 1 Kg 44,000
2 Bunga kupu-kupu (Bauhunia pupurea) 1 Kg 33,000
3 Bungur (Largerstroemia loudonii) 1 Kg 22,000
4 Buni (Antidesma bunius) 1 Kg 44,000
5 Glodogan (Polyalthea longifolia) 1 Kg 44,000
6 Mahoni (Swietenia mahagoni) 1 Kg 11,000
NO JENIS BAHAN PERTAMANAN UKURAN
TINGGI DIAMETER UNIT HARGA BAHAN
(cm) (cm)
1 2 3 4 5 6
7 Salam (Eugenia Polyanthum) 1 Kg 22,000
8 Tanjung (Mimusops elengi) 1 Kg 16,500
9 Trembesi (Samanea saman) 1 Kg 33,000

XIV TANAMAN HIAS YG MEMILIKI NILAI KHUSUS


1 Anthurium 50 Kondisi optimal Polybag 247,500
2 Belenceng yongmay 50 Kondisi optimal Polybag 55,000
3 Bonsai bentuk 75 Kondisi optimal Phn 1,100,000
4 Cemara dent 100 - 150 Kondisi optimal Phn 1,237,500
5 Cemara udang 50 - 100 Kondisi optimal Phn 1,045,000
6 Cemara udang 150 - 200 Kondisi optimal Phn 2,475,000
7 Kamboja jepang bentuk 100 - 200 Kondisi optimal Phn 1,375,000
8 Kapu-kapu 50 Kondisi optimal Phn 38,500
9 Krisan pot 30 - 40 Kondisi optimal Pot 38,500
10 Lotus 10 - 30 Kondisi optimal Rmp 143,000
11 Melati air 40 - 50 Kondisi optimal Rmp 44,000
12 Meranti karet 40 - 50 Kondisi optimal Rmp 44,000
13 Meranti pisang 100 Kondisi optimal Phn 44,000
14 Nolina 100 Kondisi optimal Phn 165,000
15 Pacira tinggi 150 Kondisi optimal Phn 330,000
16 Palm segitiga tinggi 150 - 200 Kondisi optimal Phn 495,000
17 Pandan bali cabang tinggi 150 - 200 Kondisi optimal Phn 495,000
18 Pandan bali tunggal tinggi 100 Kondisi optimal Phn 176,000
19 Philodendron hijau 50 Kondisi optimal Phn 22,000
20 Philodendron kuning 50 Kondisi optimal Phn 55,000
21 Philodendron merah 50 Kondisi optimal Phn 220,000
22 Puring kuning 50 Kondisi optimal Phn 13,750
23 Sikas antik tinggi 100 Kondisi optimal Phn 1,320,000
24 Srikit bangkok 40 - 50 Kondisi optimal Phn 66,000
25 Teratai biasa 10 - 20 Kondisi optimal Rmp 46,750
26 Tipha 50 - 100 Kondisi optimal Rmp 88,000
27 Zannia kelompok diameter 100 Kondisi optimal Phn 137,500
28 Zannia tunggal 50 Kondisi optimal Phn 121,000

WAKIL WALIKOTA PONTIANAK

TERTANDA

PARYADI, S.Hut

Untuk salinan sesuai dengan bunyi aslinya


SEKRETARIS DAERAH KOTA PONTIANAK

Ir. H. TONI HERIANTO, MT


Pembina Utama Muda
NIP. 19541129 198003 1 016