DAFTAR ISI
EXCECUTIVE SUMMARY
I. KRITERIA DESAIN
IV. PEMBEBANAN
LAMPIRAN
EXECUTIVE SUMMARY
“EXECUTIVE SUMMARY”
4. Besi Beton
Besi Beton Ulir : 400 Mpa (BJTD 40) untuk dia. D 10 ( dia.
10 mm, 13 mm, dst)
5. Klasifikasi Tanah: SE (Tanah Lunak)
6. Parameter percepatan terpetakan: Karawang: Ss = 0.78g, S1 = 0.36g
7. Koefisien situs, Fa = 1.272, Fv = 2.52
8. Parameter spectrum response pada: perioda pendek, SMS = 0.998 g,
periode 1 detik, SM1 = 0.93 g
9. Parameter percepatan spectral design: SDS = 2/3 SMS =0.665 g,
SD1 = 2/3 SM1=0.621 g
T0=0.186 det; TS=0.933 det
10. Kategori Disain Seismik: KDS D
11. Tipe Struktur:
Sistem Portal Baja Pemikul Momen Khusus
Faktor Reduksi Gempa R = 8
Faktor Redudansi ρ = 1
Faktor Pembesaran Displacement, Cd = 5.5
Faktor Kuat Lebih Ωo = 3
12. Pengecekan defleksi vertikat akibat beban service dan gempa telah
dilakukan dan memenuhi syarat.
13. Pengecekan Stress ratio telah dilakukan dan memenuhi syarat, nilai
diangka <1.
14. Modal participating mass ratio output program nilainya harus melebihi 90
%
Modal participating mass ratio: 92 %
I.KRITERIA DESAIN
KRITERIA DESAIN
1. PENDAHULUAN
Bab ini menjelaskan tentang kriteria desain serta keterangan umum perencanaan struktur
proyek “Warehouse PT. Heinz ABC” sebagai acuan Perencana Struktur dalam melakukan
pekerjaan perencanaan struktur. Kriteria desain menjelaskan secara singkat mengenai
peraturan-peraturan, standar-standar yang digunakan, pembebanan, jenis dan mutu
bahan/material struktur, tipe/jenis , sistem struktur atas dan struktur bawah/pondasi,
analisa/modelisasi struktur, anggapan-anggapan yang digunakan dll.
Nama Proyek :
Tipe/Sistem Struktur
Fungsi Bangunan
4. MUTU/STANDAR BAHAN
4.1. Beton
Kekuatan karakteristik silinder beton (f’c) yang didasarkan atas kekuatan beton pada umur 28 hari sebagai
berikut:
Pile Cap : f'c= 25 MPa
TieBeam : f'c= 25 MPa
Kolom Pedestal : f’c= 25 MPa
Besi Beton Ulir : 400 Mpa (BJTD 40) untuk dia. D 10 ( dia. 10 mm, 13 mm, dst)
Structural Connection : Baut HTB ASTM A325 (Tensile strength = 120 ksi = 843 Mpa)
5. PEMBEBANAN
Beban Mati, Beban Mati tambahan, berat sendiri struktur, berat finishing arsitektur dan berat ducting / kabel / pipa
M/E dimasukkan serta diperhitungkan sebagai Beban Mati. Beban Mati material dan komponen bangunan
dihitung berdasarkan Tabel-1 berikut :
Tabel-1 : BEBAN MATI
Beban equipment M/E (Genset, Cooling Tower, Reservoir, alat/mesin khusus, dan lain-lain) akan dihitung
berdasarkan informasi /data dari M/E.
Besaran beban hidup dan reduksi beban hidup mengikuti ketentuan SNI 1727 : 2013 Beban Minimum untuk
Perancangan Bangunan Gedung dan Struktur Lain.
Pada prinsipnya, beban horisontal gempa yang digunakan dihitung berdasarkan atas “Tata Cara
Perencanaan Ketahanan Gempa untuk Bangunan Gedung” SNI 03-1726-2019.
Bangunan ini termasuk pada Kategori Desain Seismik D dengan Kategori Risiko Bangunan Tipe II.
Perhitungan beban gempa secara lebih detail dijelaskan dalam Butir 8 “Perencanaan Gempa”.
Kombinasi pembebanan dihitung berdasarkan atas Peraturan Perencanaan yang berlaku. Untuk struktur beton,
elemen struktur direncanakan sesuai persyaratan kekuatan (“Desain Strength”) pada kombinasi beban batas seperti
diuraikan berikut ini:
dimana :
U = Required Strength (kuat perlu)
= Strength Reduction Factor (faktor reduksi kekuatan)
a. U = 1,4 D
b. U = 1,2 D + 1,6 L + 0,5 (Lr atau R)
c. U = 1,2 D + 1,6 (Lr atau R) + (L atau 0,5W)
d. U = 1,2 D + 1,0 W + L + 0,5 (Lr atau R)
e. U = 1,2 D + 1,0 E + L
f. U = 0,9 D + 1,0 W
g. U = 0,9 D + 1,0 E
Apabila beban tanah H bekerja pada strukur, maka harus diperhitungkan sebagai berikut ;
1. Bila H bekerja sendirian atau menambah pada pengaruh beban lainnya, harus disertakan dengan
faktor beban sebesar 1,6;
2. Bila pengaruh H permanen dan melawan pengaruh beban lainnya, harus disertakan dengan faktor beban
sebesar 0,9;
3. Bila pengaruh H tidak permanen tetapi, bila ada, melawan pengaruh beban lainnya, H tidak boleh disertakan.
Bilamana sesuai, pengaruh struktural dari T harus ditinjau dalam kombinasi dengan beban lainnya. Faktor beban
pada T harus ditentukan dengan memperhitungkan ketidaktentuan yang sepertinya terkait dengan besaran T,
probabilitas dimana pengaruh maksimum dari T akan terjadi serentak dengan beban terapan lainnya, dan
konsekuensi yang berpotensi merugikan jika pengaruh T lebih besar dari yang diasumsikan. Faktor beban pada T
tidak boleh mempunyai nilai kurang dari 1,0.
Kombinasi beban gempa yang digunakan untuk desain kekuatan adalah sebagai berikut :
dimana :
U = kuat perlu (“Required Strength”)
D = beban mati
L = beban hidup
ρ = faktor redundansi
QE = pengaruh gaya gempa horizontal
SDS = parameter percepatan respons spektral pada perioda pendek dengan redaman 5 persen.
6. SISTEM STRUKTUR
Sistem struktur yang dipakai dalam perhitungan struktur Warehouse adalah Sistem Portal Baja Pemikul
Momen Khusus. Sesuai SNI Gempa 2019, maka gaya gempa rencana dihitung dengan menggunakan nilai faktor
reduksi gempa, R = 8.
Struktur terdiri atas pondasi dalam (Tiang Pancang Tekan atau Tiang Bor/Bored Pile). Pemilihan jenis pondasi
dalam akan ditentukan kemudian antara lain berdasarkan kondisi tanah, beban kolom, pengaruh terhadap
lingkungan , akses masuk alat ke site, ketersedian alat, biaya, waktu, dst.
8. PERENCANAAN GEMPA
Beban gempa yang digunakan adalah Respons Spektrum dari Tata Cara Perencanaan Ketahanan Gempa untuk
Bangunan Gedung SNI 03-1726-2019.
Lokasi proyek termasuk dalam Kelas Situs SE (Tanah Lunak) dengan Kategori Desain Seismik D, Kategori
Resiko Bangunan II dan Faktor Keutamaan, Ie = 1,00.
Berdasarkan periode getar bangunan T yang diperoleh, selanjutnya dihitung nilai Sa (Percepatan Respons Spektra)
sesuai dengan wilayah dan kelas situs. Ordinat dari Respons Spektrum dikoreksi dengan faktor koreksi I/R dengan
memperhitungkan tipe/sistem struktur untuk menjadikan beban gempa menjadi beban gempa nominal.
Analisis harus menyertakan jumlah ragam yang cukup untuk mendapatkan partisipasi massa ragam terkombinasi
sebesar paling sedikit 100 persen dari massa aktual dalam masing-masing arah horisonal orthogonal dari respons
yang ditinjau.
PENGECUALIAN Sebagai alternatif, analisis diizinkan untuk memasukkan jumlah ragam yang minimum
untuk mencapai massa ragam terkombinasi paling sedikit 90 % dari massa aktual dalam
masing-masing arah horizontal ortogonal dari respons yang ditinjau oleh model.
Perhitungan Respons Maksimum dilakukan dengan 2 cara superposisi yaitu CQC (Complete Quadratic
Combination) atau SRSS (Square Root of the Sum of Squares). Metode CQC harus digunakan dimana ragam
berjarak dekat mempunyai korelasi silang yang signifikan di anatara translasi dan torsi.
Gaya geser tingkat nominal akibat pengaruh Gempa Rencana sepanjang tinggi struktur gedung hasil analisis
ragam spektrum respons dalam suatu arah tertentu dikalikan nilainya dengan suatu faktor skala
FS = V/Vt > 1
dimana:
FS = Faktor Skala
V = gaya geser dasar prodedur gaya lateral ekivalen.
Vt = gaya geser dasar nominal yang didapat dari hasil analisis ragam spektrum respons yang
telah dilakukan.
Gaya geser seismik dalam arah yang ditetapkan ditentukan sebagai berikut :
V = Cs Wt
dimana :
V = Gaya geser dasar nominal statik ekivalen.
Cs = Koefisien respons seismik.
R = Faktor modifikasi respons gempa.
Wt = Berat seismik efektif.
SDS = Parameter percepatan spektrum respons desain dalam rentang periode pendek.
SD1 = Parameter percepatan spektrum respons desain pada periode sebesar 0,1 detik .
T = Periode fundamental struktur yang ditentukan.
Gaya geser dasar nominal V dibagikan sepanjang tinggi struktur gedung menjadi beban-beban gempa nominal
statik ekivalen Fx yang menangkap pada pusat massa lantai tingkat ke-i menurut persamaan :
dimana:
Cvx = faktor distribusi vertikal.
V = gaya lateral desain total atau geser dasar dari struktur.
wi dan wx = bagian berat seismik efektif total struktur (W) yang dikenakan pada tingkat i atau x.
hi dan hx = tinggi dari dasar sampai tingkat i atau x
k = eksponen terkait dengan periode struktur
T ≤ 0,5 sec maka k = 1
0,5 sec ≤ T ≤ 2,5 sec maka 1 ≤ k ≤ 2
T ≥ 2,5 sec maka k = 2
Gaya gempa diijinkan untuk diterapkan secara terpisah dalam masing-masing arah dari dua arah orthogonal.
Pengaruh beban paling kritis akibat penerapan gaya gempa pada struktur dianggap terpenuhi jika komponen dan
fondasinya didesain untuk memikul kombinasai beban yang ditetapkan berikut :
A. Komponen Struktur Lentur (BALOK) pada Sistem Rangka Pemikul Momen Khusus ( SRPMK ).
Gaya geser rencana Ve ditentukan dari peninjauan gaya statik antara dua muka tumpuan. Mpr dianggap bekerja
pada muka-muka tumpuan dan komponen tersebut dibebani beban gravitasi terfaktor sepanjang bentangnya.
Ve Ve
Mpr1 Mpr2
L
M pr1 M WuL
pr2
Ve
L 2
dimana :
Mpr : kuat momen lentur mungkin dari suatu komponen struktur dengan atau tanpa beban aksial, yang
ditentukan menggunakan sifat-sifat komponen struktur pada muka joint dengan menganggap kuat tarik pada
tulangan longitudinal minimum 1.25 fy dan factor reduksi Ø = 1 N-mm.
Ve : gaya geser rencana.
fy : kuat leleh yang disyaratkan.
Arah gaya geser Ve tergantung pada besar relative beban gravitasi yang dihasilkan oleh momen-momen ujung.
Momen-momen Mpr ujung didasarkan pada tegangan tarik 1.25 fy. Kedua momen ujung diperhitungkan untuk
kedua arah, yaitu searah jarum jam dan berlawanan arah jarum jam.
Pada setiap irisan penampang balok, jumlah tulangan atas dan bawah adalah :
1.4
Asmin = fy bwd
f' c
Asmin = 4f b w d
y
Rasio tulangan maks < 0.025
Untuk balok T :
Asmin adalah:
f' c
A b d
smin 4f y f
f' c
A bwd
smin 2f y
dimana :
bf : lebar bagian sayap penampang.
d : jarak dari serat tekan terluar ke pusat tulangan tarik.
bw : lebar badan.
B. Komponen Struktur yang menerima kombinasi Lentur dan beban Aksial ( KOLOM ) pada Sistem
Rangka Pemikul Momen Khusus ( SRPMK ).
Kolom
Ve Ve
Pu Pu
Mpr3 Mpr4
H
M M pr4
pr3
Ve > Ve hasil analisa struktur
H
Momen-momen ujung Mpr untuk kolom tidak perlu lebih besar dari momen yang dihasilkan oleh Mpr balok pada
hubungan balok kolom. Ve tidak boleh lebih kecil dari hasil perhitungan analisis struktur. Gaya aksial tekan
terfaktor akibat gempa < Agf’c / 20.
Rasio volumetric tulangan spiral atau sengkang cincin harus memenuhi syarat :
Kuat lentur setiap kolom yang menerima beban aksial tekan terfaktor > Agf’c /10
harus memenuhi :
∑Me > (6/5) ∑Mg
dimana :
∑Me : jumlah momen pada muka joint, yang berhubungan dengan kuat lentur nominal kolom yang
merangka pada join tersebut, yang dihitung untuk beban aksial terfaktor, konsisten dengan arah
gaya lateral yang ditinjau yang menghasilkan kuat lentur terkecil.
∑Mg : jumlah momen pada muka join, yang berhubungan dengan kuat lentur nominal balok (termasuk
pelat yang berada dalam kondisi tarik) yang merangka pada joint tersebut.
fyh : kuat leleh tulangan transversal yang disyaratkan.
hc : dimensi penampang inti kolom diukur dari sumbu ke sumbu tulangan pengekang.
s : spasi tulangan transversal diukur sepanjang sumbu longitudinal komponen struktur.
Ag : luas penampang bruto.
Ach : luas penampang komponen struktur dari sisi luar ke sisi luar tulangan transversal.
Ash : luas penampang total tulangan transversal (termasuk sengkang pengikat) dalam rentang spasi s
dan tegak lurus terhadap dimensi hc.
g : rasio luas tulangan total terhadap luas penampang beton.
Penulangan lentur dan geser Balok maupun lentur dan geser Kolom dilakukan dengan bantuan program ETABS
v.18.1.1 dimana parameter-parameter yang digunakan disesuaikan dengan Tata Cara Perhitungan Struktur Beton
untuk Bangunan Gedung, SNI-03-2847-2019.
9. Perencanaan Pondasi
Berdasarkan hasil penyelidikan tanah, klasifikasi tanah yang digunakan adalah Tanah Lunak.
Pemilihan jenis pondasi dalam akan ditentukan kemudian antara lain berdasarkan kondisi tanah, beban kolom,
pengaruh terhadap lingkungan, akses masuk alat ke site, ketersedian alat, biaya, waktu, dst. Daya dukung aksial
tekan, aksial tarik, dan lateral pada prinsipnya akan memakai daya dukung hasil perhitungan perencana dengan
mempertimbangkan rekomendasi yang diberikan dalam laporan soil test yang ada.
9.3. Daya Dukung Izin Pondasi Pada Beban Tetap & Beban Sementara (ASD Method)
Pondasi Tiang Pancang direncanakan mampu mampu memikul baik beban gravitasi, beban gempa rencana
maupun beban gempa kuat dengan mengikuti ketentuan-ketentuan sebagai berikut:
Daya dukung tekan dan tarik tiang pancang dihitung berdasarkan Nilai SPT dengan menggunakan rumus:
Pu = (25 x Np x Ap ) +
03.32
03.32
03.31
03.31
03.30
03.30
03.29
03.29
03.28
03.28
03.27
03.27
03.26
03.26
03.25
03.25
Roof Bracing
03.24
03.24
Round Bar 16 mm
03.23
03.23
03.22
03.22
Gording
CNP.150x65x20x2,3
03.21
03.21
03.20
03.20
03.19
03.19
03.18
03.17
03.17
04.2
04.2
03.16
03.16
03.15
03.15
Gording
2CNP.150x65x20x2,3
03.14
03.14
03.13
03.13
03.12
03.12
03.11
03.11
03.10
03.10
03.9
03.9
03
3.8
ETABS 18.1.1
+12.50
. WF400 . WF400
WF400 . WF400 .
WF-150
. WF400
W
.
F2
+6.5
00
WF400
WF400
WF400
+1.50
K47
K47
K47
+0.00
0
+12.50
. WF400 . WF400
WF400 . WF400 .
WF-150
. WF400
W
.
F2
+6.5
00
WF400
WF400
WF400
+1.50
K47
K47
K47
+0.00
0
+12.50
. WF400 . WF400
WF400 . WF400 .
WF-150
. WF400
W
.
F2
+6.5
00
WF400
WF400
WF400
+1.50
K47
K47
K47
+0.00
0
+12.50
. WF400 . WF400
WF400 . WF400 .
WF-150
. WF400
W
.
F2
+6.5
00
WF400
WF400
HB300
+1.50
K55
K47
K47
+0.00
0
+12.50
00. WF-
. WF400 . WF400 WF-3
300.
WF400 . WF400 . 30 0.
WF -
300 .
WF-
WF-150
. WF400
. WF-
150.
WF-
150
. WF-
2150L. +6.5
2L
50
5
WF150
WF150
2L50
0
WF150 WF150 WF150 WF150
WF150
WF400
WF400
WF300
WF300
+1.50
K47
K47
K35
K35
+0.00
0
+12.50
00. WF-
. WF400 . WF400 WF-3
300.
WF400 . WF400 . 30 0.
WF -
300 .
. WF-
WF400 WF-
150.
WF-
150
. WF-
2150L. +6.5
2L
50
5
WF150
WF150
2L50
0
WF150 WF150 WF150 WF150
WF150
WF400
WF400
WF300
WF300
HB300
+1.50
K55
K47
K47
K35
K35
+0.00
0
0.
WF-
15
0. WF-
15
0. WF
-15
+12.50
-15 0.
WF
WF150
WF150
0 WF30
WF400 . WF400 .
WF-
300.
WF-150
. WF400
. WF-
150.
WF-
150
. WF-
2150L. +6.5
2L
50
5
WF150
WF150
2L50
0
WF150 WF150 WF150 WF150
WF150
WF400
WF400
WF300
WF300
+1.50
K47
K47
K35
K35
+0.00
0
0.
WF-
15
0. WF-
15
0. WF
-15
+12.50
-15 0.
WF
WF150
WF150
0 WF30
WF400 . WF400 .
WF-
300.
WF-150
. WF400
W
.
F2
WF-
150.
WF-
150
. WF-
2150L. +6.5
2L
00 50
5
WF150
WF150
2L50
0
WF150 WF150 WF150 WF150
WF150
WF400
WF400
WF300
WF300
HB300
+1.50
K55
K47
K47
K35
K35
+0.00
0
0.
WF-
15
0. WF-
15
0. WF
-15
+12.50
-15 0.
WF
WF150
WF150
0 WF30
WF30
WF-
300.
0
300.
WF-
WF-
150.
WF-
150
. WF-
2150L. +6.5
2L
50
5
WF150
WF150
2L50
0
WF150 WF150 WF150 WF150
WF150
WF300
WF300
+1.50
K35
K35
+0.00
0
0.
WF-
15
0. WF-
15
0. WF
-15
+12.50
-15 0.
WF
WF150
WF150
0 WF30
WF30
WF-
300.
0
300.
WF-
WF-
150.
WF-
150
. WF-
2150L. +6.5
2L
50
5
WF150
WF150
2L50
0
WF150 WF150 WF150 WF150
WF150
WF300
WF300
+1.50
K35
K35
+0.00
0
1. Beban Mati
Atap Metal Sheet = 6 kg/m2
Ceiling = 0 kg/m2
Insulation 0.02 x 16 kg/m3 = 0.32 kg/m2
Solar Panel = 0 kg/m2
ME = 18 kg/m2
= 24.32 kg/m2
2 Beban Hidup
180 180
180 180 180 180
180 180
180180 180180
180 180
180 180 180
180180
180 180 6060
180 60 6060 180
180
180
180 180 180
60
1806060 60 180 180
180 180
180
180 180 60 180 180
180
180
180
180 180
180180180 6060 180
60 6060 180
180
180
180
180
1 1
180
80 1
80 80 6060
60 60 180180
180
180
180
180 60 180 180
180 60 60 180
180 6060 180 180
180
180
180 180180 18060 180 180
60 180
180
180 180
180 180 6060 6060 180
180 180 180
180
180
6060 60180
180 180
180
180
180
180 180180
1 80 60 60 180 180
180
180
180 180
180
180
180
180
180
180
180
180
180
180
180
180
180
180 60 180 180 180
180
180 180
180 180 180
180 180 6060 6060 180 180
180
180
180
180
180
180
180 180 180
180
180
180
180
180
180
180
180
180
180
180
180
180 60 180 180 180
180
180
180
180
180 180
180 180
180 180 6060 6060 180
180 180
180
180
180
180
180
180
180
180
180
180
180 180
180 180 180 180
180
180
180
180
180
180
180 180 180
180 60
60 60 180 180
180 180 180 180
180
180
180180 180 180
180 180 60 60 180 180
180
180
180 180 180
180
180
180
180
180
180 180
180 180
180 180
180 180
180
180 180 180
180
180
180
180
180
180
180
180
180
180
180180
180
180
180
180 180
180
180 180
180 606060 180 180
180
180
180 180
180 180
180
180
180
180
180 180 180
180 180
180 180 60 60 180
180 180 180
180
180 180
180
180
180
180
180
180
180 180
180 180 180
180
180
180
180
180
180
180
180
180
180 180 180 180
180 180 60
60 60 180 180
180
180
180
180
180
180
180 180
180 180
180
180
180
180 180 180
180 180
180 180
180 180 60 60 180
180 180
180
180 180
180
180
180
180
180
180
180 180
180 180
180 180
180
180 180 180 180
180
180
180 180 180 180 180
180
180
180
180
180
180
180
180
180 180
180 180
180 180 180
180 180 606060 180 180
180
180
180
180
180 180 180
180 180
180 180 180
180 180
180 180 60 60 180
180 180
180
180 180
180 180
180
180
180 180 180180 180 180
180
180
180
180
180 180 180
180 180
180
180
180
180 180
180 180 606060 180 180
180
180
180
180
180
180 180
180 180 180
180
180
180 180 180 180
180
180
180
180
180 180 180
180 180
180 180 180
180 180
180
180180 60 60 180 180
180
180 180
180 180
180
180
180 180 180
180 180
180
180
180
180
180
180 180 180
180 180180
180
180
180 180
180 180 606060180 180
180
180
180
180
180 180
180 180 180
180
180
180 180 180 180 180
180
180
180
180
180 180 180 180 180 180
180 180 180180
180 60 180 180
180 180 180
180
180
180 180
180 180 180 180
180
180 180
180 180
180
180 180 180
180 180
180 180 180
180
180
180
180 180 180 180 180
180
180 180
180 180
180
180 180
180 180
180 180 180
180 180
180
180
180 180 180 180
180 180 180
180
180 180
180
180 180
180 180
180 180
180 180 180
180 180
180
180
180 180 180 180 180
180
180 180
180
180 180
180 180 180
180
180 180
180 180 180 180
180
180
180
180 180 180 180
180
180
180 180 180 180
180
180
180
180 180
180 180
180 180
180
180 180 180 180
180 180
180 180
180
180 180
180 180
180
180
180 180
180
180
180
180
180
180
Risk Category = IV Table 1.4-1 SNI 1727:2013 𝑞 = 0.613 . 𝐾𝑧 . 𝐾𝑧𝑡 . 𝐾𝑑 . 𝑉 2 . I (N/m2) ; V (m/s) 27.3-2 SNI 1727:2013
Importance Factor = 1 Table 1.5-2 SNI 1727:2013 Velocity Pressure Exposure, Kz
2
Wind Speed, V = 32.1 m/s For z < 4.6 m = 𝐾𝑧 = 2.01(15ൗ𝑍𝑔) ൗ
Exposure Type = D Table 27.3-1 SNI 1727:2013
2
Roof Angle = 15 ˚ Table 27.4-1 SNI 1727:2013 For 4.6 m < z < 274 m = 𝐾𝑧 = 2.01(𝑍ൗ𝑍𝑔) ൗ
Height, H = 8 m
Length, L = 16.25 m Z = 10.5
Wide, B = 90 m Zg = 213.36
26.9-1 SNI 1727:2013
H/L = 0.49 a = 11.5
L/B = 0.1805556 h = 12
Cp Windward (dinding) = 0.8 Table 27.4-1 SNI 1727:2013 Kz = 1.19
Cp Windward (Atap) = -0.7 Kzt = 1 26.8-2 SNI 1727:2013
Cp Leeward (Dinding) = -0.5 Kd = 0.85 Table 26.6-1 SNI 1727:2013
Cp Leeward (Atap) = -0.18 Kh = 1.22
2
Gust factor, G = 0.85 26.9-4 SNI 1727:2013 Qz = 639.18 N/m
2
65.16 Kg/m
Diambil nilai Qz = 77.00 Kg/m2
2
Qh = 654.19 N/m
2
= 66.69 Kg/m
diambil nilai Qh = 77.00 Kg/m2
Internal Pressure (GCpi) Table 26.6-1 SNI 1727:2013
Enclosure Classification Gcpi
Open Building 0
+ 0.55
Partially Enclosed Building
- 0.55
+ 0.18
Enclosed Building
- 0.18
151 15
0 0
15 5 0 150
105
15 42 0 00 150 1510
420105 4202
4 50
420 1510
142 0 0 2 1
0 50 50
42 0 5
105 4 240
0 1 1 5
1
420 1420510 424020 50 1 050
0 50 1 5 51050
5105 424020 0 1
420 142
0020 150 51050
420 1420 2
5105 4 4
1510
420 1 420 4024020 150 50
510 1510
420 420 5024020 150 50
151 4 1510
420 42005024020150 50
15 4 1510
1510 420 420 105
510510 0 20 150 50
51051
051051 15 4240 151
42420042
42 42
0 042
42 15105 051051 105
420 420 1 05
0420042
42042
0420010
42
42
5142
0510
0 42
05100510 051051
05105 1 4024020 50 0
42
42 042
042 1 5
01 0 5105
420 420 15
105
42
042
042
042
042
04205142
042 005 051051 1
142
042
0 010542
5 0 000
1042
515
051051
05105
1510
51051 4024020 50 0
42
4204204242
042042
042
01051
5 0 051051 420 1420 510 151
050
042
0142 0420 42
0
51051 0042 4242 000
042 010
510
51051 420 15105 051051
051051 54024020150
051015 05105 1 0
510510 051051 420 1420 151
0
51 0 51051 05105 510 050
44 20 20
442
2042
42042
042 1
042
04205142
0042
01
505
105
1
4242042
42
0 042
0
420
420
4242
0 142
5 0
51051 0 54024020150
042
5100420 42
042
51051 000 05
1 051051 0 0
42
1 0
042042
510510 0 051051 420 1420 151
442420 0
51 0
51 0 4 24 0
510
51 05
1 0
5 510 050
4204204
204204204202 051051 5 0 0
2402
402
40 05105 1050 01
40
5120 24
140
05142005124040
24202 051051 20240 2402
40
2402 2404 105105 1 5402402 50
00
4
051051 0
2 051051 1510 4024020 10510
51051
420 42050 151
4422
4
004
240
24204204204204204 05105 51051 050
151 2042 04204
2
040
2
0
5
1 0
5
1 0
5
1
0 4422 0404
220404
20
051051 050 4 24020 150
05151 2
4
0 00
2 051051 4
2 4
0
2 04
212
04 4
0
2 051051 420 42015 420 1
44224040 0 051 051051 51051024024020 051051 0 5105
24 2042
04204204204 051051 050 4240 051051 05105 0
1512042 04204 2042
04
2042
02
00
051051
01
5
4
2240240240
0 4
2 2
0
4 0
4
2 4
051051 105105
0 420 420
15
0
4422 051051 5
0
1 0
51051 1 2
0 2
04 0
2404
2
51051 020 051051051 420 1 5105
404
042
2 04204204 051051 050 15
2042
042042042
04204204 0515 42
4040
2 2 051051 051051 0 0
40
204 02
2 00 0105105101 40
2 2
4040
2 2
40 4
2 2
0
4 0
2402
0
51 0 51 0
05105
0 1 5
5051 151 4 0
4
2 20
0 5
1 05105 420 420 420 0
050 051 4422 051051 10510 151
400
2
40 2
4040
2 05105 51051 050
2402
4040
2 2
40 1051 050
2402
4 4020
0
2 051051
44 151 05
2404
2 04
2 051051 105105
02
2 0402
4402
2 05105 1051
0404
202402402 1051 050
4200 05105
1051
05105
1051
050
2021.02.26_Heinz ABC-str atas-report.EDB 3-D View Frame Span Loads Local-2 (WL)
396
396 ETABS 18.1.1
396
396
396
396
396
3 96
396 396
270 270
270 270
270 270
2 7 0 2 70
270 270
270 270
270 270
270 270
Penentuan kategori resiko bangunan dilakukan berdasarkan fungsi dari bangunan. Mengacu pada Tabel (SNI 1726-
2019), pada kasus ini kategori resiko bangunan diambil berdasarkan fungsi bangunan yaitu Kantor
Gedung dan nongedung yang memiliki risiko rendah terhadap jiwa manusia pada saat terjadi
kegagalan, termasuk, tapi tidak dibatasi untuk, antara lain:
- Fasilitas pertanian, perkebunan, perternakan, dan perikanan
I
- Fasilitas sementara
- Gudang penyimpanan
- Rumah jaga dan struktur kecil lainnya
Semua gedung dan struktur lainnya, kecuali yang termasuk dalam kategori resiko I,III, IV
termasuk, tidak dibatasi untuk :
- Perumahan
- Rumah Toko dan Kantor
- Pasar
- Gedung Perkantoran II
- Gedung Apartemen / Rumah Susun
- Pusat Perbelanjaan / Mall
- Bangunan Industri
- Fasilitas Manufaktur
- Pabrik
Gedung dan nongedung yang memiliki risiko tinggi terhadap jiwa manusia pada saat terjadi
kegagalan, termasuk, tapi tidak dibatasi untuk:
- Bioskop
- Ruang Pertemuan
- Stadion
- Fasilitas kesehatan yang tidak memiliki unit bedah dan unit gawat darurat
Gedung dan nongedung, tidak termasuk kedalam kategori risiko IV, yang memiliki potensi
untuk menyebabkan dampak ekonomi yang besar dan/atau gangguan massal terhadap
III
kehidupan masyarakat sehari-hari bila terjadi kegagalan, termasuk, tapi tidak dibatasi untuk:
Gedung dan nongedung yang tidak termasuk dalam kategori risiko IV, (termasuk, tetapi tidak
dibatasi untuk fasilitas manufaktur, proses, penanganan, penyimpanan, penggunaan atau tempat
pembuangan bahan bakar berbahaya, bahan kimia berbahaya, limbah berbahaya, atau bahan
yang mudah meledak) yang mengandung bahan beracun atau peledak di mana jumlah
kandungan bahannya melebihi nilai batas yang disyaratkan oleh instansi yang berwenang dan
cukup menimbulkan bahaya bagi masyarakat jika terjadi kebocoran.
Gedung dan nongedung yang dikategorikan sebagai fasilitas yang penting,
termasuk, tetapi tidak dibatasi untuk:
- Bangunan-bangunan monumental
- Gedung sekolah dan fasilitas pendidikan
- Rumah ibadah
- Rumah sakit dan fasilitas kesehatan lainnya yang memiliki fasilitas bedah
dan unit gawat darurat
- Fasilitas pemadam kebakaran, ambulans, dan kantor polisi, serta garasi
kendaraan darurat
- Tempat perlindungan terhadap gempa bumi, tsunami, angin badai, dan
tempat perlindungan darurat lainnya IV
- Fasilitas kesiapan darurat, komunikasi, pusat operasi dan fasilitas lainnya
untuk tanggap darurat
- Pusat pembangkit energi dan fasilitas publik lainnya yang dibutuhkan pada
saat keadaan darurat
- Struktur tambahan (termasuk menara telekomunikasi, tangki penyimpanan
bahan bakar, menara pendingin, struktur stasiun listrik, tangki air pemadam
kebakaran atau struktur rumah atau struktur pendukung air atau material
atau peralatan pemadam kebakaran) yang disyaratkan untuk beroperasi pada
saat keadaan darurat
Lokasi = Karawang
Kategori Risiko = Kategori II
Kelas Situs = SE
Ss = 0.784
S1 = 0.369
Fa = 1.272
Fv = 2.522
S MS = 0.998
S M1 = 0.932
S DS = 0.665
S D1 = 0.621
T0 = 0.182
Ts = 0.909
Tabel 6 - Koefisien Situs F a (SNI 1726-2019)
Parameter Respon Spektral Percepatan Gempa (MCER) Terpetakan Pada Periode Pendek,
Kelas Situs T = 0,2 detik, S s
Parameter Respon Spektral Percepatan Gempa (MCER) Terpetakan Pada Periode 1 detik, S 1
Kelas Situs
Lokasi : Karawang
Kategori Resiko : Kategori II
S DS : 0.665
S D1 : 0.621
Penentuan sistem struktur bangunan untuk sistem penahan gempa dilakukan berdasarkan tabel (SNI 1726 - 2019),
diperoleh parameter sebagai berikut :
Tipe Struktur = Sistem Rangka Baja
dan Pemikul Momen Khusus
Koefisien Modifikasi (R ) = 8
Faktor Kuat Lebih (Ώ) = 3
Faktor Amplifikasi (C d ) = 5.5
VI.ANALISIS STATIK STRUKTUR
Input Analisis Statik akibat Beban Gravitasi, Data Kombinasi
Pembebanan
1 Loads
This chapter provides loading information as applied to the model.
1.1 Materials
Project = Warehouse
Building = Warehouse
Kategori Desain Seismik = D (Karawang)
Height of Building ( Hn ) = 8.5 m
n ( number of story ) = 1
x (parameter perioda pendekatan Ct dan x) = 0.80
Ct = 0.0724
Ta = Ct hnx = 0.40 sec
Cu = 1.40
Cu Ta = 0.562 sec
Tx ( Time Period for x direction ) = 1.10 sec (from dynamic analysis)
T = z n (SNI 1726 - 2002) = 0.18 sec (sebagai pembanding)
T used = 0.562 sec
k = 1.30
Total Weight ( Wt ) = 70,389 Kgf
Importance Factor ( I e ) = 1.00
Reduction Factor ( R ) = 8.00
Cs max = SD1/T(R/Ie) = 0.14
Cs min ≥ 0.01 = 0.01
Cs min = 0.044SDSIe = 0.03
Cs min = 0.03
Cs min = 0.5S1/(R/Ie) = 0.02 If S1 ≥ 0.6g
Respons Seismic Coeficient Cs = SDS/(R/Ie) = 0.08
C used = 0.0832
Base Shear ( V = Cs Wt ) = 5,855 Kgf
Gravity ( g ) = 9.81 ( m / sec² )
Mass Source From Load :
DL ( Reduction Factor ) = 1.00 ( Input Etabs )
DISTRIBUSI BEBAN LATERAL
ARAH-X
( ANALISIS STATIK )
Project = Warehouse
Building = Warehouse
Kategori Desain Seismik = D (Karawang)
Height of Building ( Hn ) = 8.5 m
n ( number of story ) = 1
x (parameter perioda pendekatan Ct dan x) = 0.80
Ct = 0.0724
Ta = Ct hnx = 0.40 sec
Cu = 1.40
Cu Ta = 0.562 sec
Ty ( Time Period for y direction ) = 1.10 sec ( from dynamic analysis )
T = z n (SNI 1726 - 2002) = 0.18 sec (sebagai pembanding)
T used = 0.562 sec
k = 1.30
Total Weight ( Wt ) = 70,389.50 Kgf
Importance Factor ( I e ) = 1.00
Reduction Factor ( R ) = 8.00
Cs max = SD1/T(R/Ie) = 0.13
Cs min ≥ 0.01 = 0.01
Cs min = 0.044SDSIe = 0.03
Cs min = 0.03
Cs min = 0.5S1/(R/Ie) = 0.02 If S1 ≥ 0.6g
Respons Seismic Coeficient Cs = SDS/(R/Ie) = 0.08
C used = 0.0832
Base Shear ( V = Cs Wt ) = 5,855 Kgf
Gravity ( g ) = 9.81 ( m / sec² )
Mass Source From Load : =
DL ( Reduction Factor ) = 1.00 ( Input Etabs )
DISTRIBUSI BEBAN LATERAL
ARAH- Y
( ANALISIS STATIK )
Project = Warehouse
Building = Warehouse
KDS = D
Height of Building ( H ) = 8.50 m
Tx ( Time Period for x direction ) = 1.10 sec
Ty ( Time Period for y direction ) = 1.10 sec
Project : Warehouse
Building : Warehouse
Project : Warehouse
Building : Warehouse
COMB1 1.4 DL
COMB-WIND1
COMB-WIND2
Kombinasi Pembebanan SNI 1726.2019
SDS = 0.666 ##
ρ = 1 1
COMB1 1.40 DL
-0.54
431
256
-0.5
31
-0.0
-0.56
882
-1.6-08.176
155
0.23
85
838
0.66
-0.5
-1.6
89
88
0.71
39
0.33
325
84 7
0.67
.44488
-0.1
06
99
2
0.26
-0.0 8
.0
1
-0.0317
-0.0204
00.4
62
00
-0
0.13
09
0. .023 0.
06
1.2581 -1.1558
08
0.0303
-
0.0027
8
0.02
-0.109 0.6003 0.1647 -0.0032
-0.0035
05
2
0.6108 9E-
0.1132
0.0827
0.1227
-0.4908
00
0.2893
0
.1
3
-0.1805
0.2923 -0.4252
2021.02.26_Heinz ABC-str atas-16.25.EDB Elevation View - 03.32 Moment 3-3 Diagram (DL) [tonf-m]
ETABS 18.1.1
-0-.0.
9591
0310
1003
-0-.0.
3395
0 .0
-0.5 9
-0.56
615
75
75
0.0
0.0527 -0.0584
9
15
-0.05970.054
-0.94
172
-2.2-08.190
669 9
53
0.56
-0.2-2.158
13
-0.9
0.32
00.8.899
42
97
63 3
88
0.59
546
0.72
85
3
08
0.60
0.10
57
5555
-0.0 8
0.52
.0
02
-0.0491
-0.0352
-0
0.02
23
.0
91
1.6965 -1.4965
262-0
0.0727 0.0036
00.0.0440
-0.2249 0.2933
-0.0049
7
0.9394 .000
0.21087
-0.9355
0.2706
0.0877
4
0.5089
00
0
0.
0.615 -0.6695
2021.02.26_Heinz ABC-str atas-16.25.EDB Elevation View - 03.31 Moment 3-3 Diagram (DL) [tonf-m]
ETABS 18.1.1
0.0
718
87 0.270
0.27 70.0
0.82
96
1-
0.2 1
0.81
27
3
22
02
23
-0 .
-0.1278 0.1276
46
-0.0
43
0.10
-0.33
21
-0.01
0.44
172
02
-0.65
95
-0.33
01
98
68
-0.96
67
0.
-0.64
0.3165
47
-0.2573 0.0002
00
-1.26
85
-0.01
-0.9
0.
21
-1.25
78
95
-0.3702 -0.0094
1
-0.20
0.5284
36
-0.0234
-0.016
-2.5451 2.2858
-0.2352
0.3056 -0.2881
0.3056 -0.2881
2021.02.26_Heinz ABC-str atas-16.25.EDB Elevation View - 03.26 Shear Force 2-2 Diagram (DL) [tonf]
ETABS 18.1.1
0.0
718
87 0.278
0.12 0.0
0.83
98
1-
65
0.2 4
0.67
14
22
01
24
23
-0 .
-0.1253 0.1255
0.04
2
-0.0
33
-0.32
49
00 68
0.41
0.15
089
95
-0.64
23
-0.24
0.0.00
00
96
-0.96
797
0.
-0.56
0.3063
63
12
-1.25
38
-0.8
-1.17
09
12
-0.3219 -0.009
-0.20
0.5099
27
-0.0505
-0.0238
-2.371 2.1108
-0.2028
-0.2472
0.2664 -0.2771
0.2664 -0.2771
2021.02.26_Heinz ABC-str atas-16.25.EDB Elevation View - 03.27 Shear Force 2-2 Diagram (DL) [tonf]
ETABS 18.1.1
-0.46
623
125
-0.4
23
-0.1
646
-1.2-0.134
32 6
-0.35
0.14
-0.0204-0.1-1.122
64
-0.3
0.51
118 7
0011
4
0.19
238
0.57
9
2
0.55
03
00.3.344
31
-0.0 3
42
0.26
.0
00
0.0556 -0.0095
0. 0.02-0.0117
-0
53
0.15
00 06 0.0
37
0.9077 -0.8063
1
27
0.018
-
0.01
0.0019
-0.0651 0.3995 0.1103 -0.0051
-0.0025
01
0.08251
0.0707
2
0.1949
-0.1193
0.1604 -0.2816
2021.02.26_Heinz ABC-str atas-16.25.EDB Elevation View - 03.32 Moment 3-3 Diagram (LL) [tonf-m]
ETABS 18.1.1
-0-.0
35 2
0.417
1.604
9635
0 .1
5
-0-.0
-0.46
626
35
35
0.1
0.1045 -0.11
-0.4
5
26
-0.1135
0.1079
296
-0.83
816
-1.9-01.147
02
0.53
-0.2-1.753
-0.0
141
00.7.777
66
-0.7
0.30
.48822
88
478
59 2
72
18
0.56
6
05
0.02
00.4
4433
-0.0 5
0.39
.0
1
-0.0372
00
-0
72
-0.0280.
95
1.4236 -1.2117
084
0.0702
-
00.0.0329
0.0027
-0.2045 0.2469 -0.0008
-0.0037
7
0.7788 .001
0.1745
0.0817
-0.8276
00
0.2392
0.4258
0
0.
0.5415 -0.5544
2021.02.26_Heinz ABC-str atas-16.25.EDB Elevation View - 03.31 Moment 3-3 Diagram (LL) [tonf-m]
ETABS 18.1.1
96
0.0 0
0.0
96 .1424
0-.7
347
0.3
.3859
088031
-0.5
-0.2461 0.2461
96
-0.09
97
81
-0.3
-0.00
0.09 -0.0197
45
0.34
66
-0.57
-0.24
0.01
61
346
-0.81
51
2
-0.48
0.2546
44
48
-1.02
42
00
-0.72
31
0.
8.200
-0.9
16
-0.17 0
-0.3059 -0.0071
85
0.4484
-0.0496
-0.0105
-2.0954 1.7901
-0.1756
-0.2046
0.2435 -0.2389
0.2435 -0.2389
2021.02.26_Heinz ABC-str atas-16.25.EDB Elevation View - 03.30 Shear Force 2-2 Diagram (LL) [tonf]
ETABS 18.1.1
96
0.0 0
0.0
96 .2084
0-.6
27
0.2
.2786
38
367914
38
-0.4
-0.1442 0.1442
0.05
0.05
-0.03
13
0.11
-0.26
47
61
0.32
-0.50
32
-0.18
01
0.02
69
-0.74
17
-0.42
0.2184
86
39
-0.96
87
00
-0.66
4
71
0.
6.500
-0.87
56
-0.16 0
-0.2489 -0.0065
26
0.3856
-0.1407
-0.0587
-0.0098
-1.8015 1.5631
-0.1756
0.1981 -0.2051
0.1981 -0.2051
2021.02.26_Heinz ABC-str atas-16.25.EDB Elevation View - 03.31 Shear Force 2-2 Diagram (LL) [tonf]
03.1403.14
03.C03.C'
-13.8896
8
-14.882
12.5633
19.0455
4
-11.685
-8.2123
-5.1079
-2.3722
-0.0051
1.9934
3.6232
4.8843
5.7768
6.3006
4558
6.45
6. 58
6.2424
6.2066
8433
.384
66.3
(DL) [tonf-m]
6.1933
5.6337
4.7055
3.4085
1.743
-0.2912
-3.2167
-12.1146
03.14
03.B
-15.3419
41
-12.69
2.431
32
-10.03
4
-7.099
9
-4.478
6
-2.171
-16.6953
4
-7.921
-11.201
99
-10.92
-13-6 520475
.6.0 4
7.2168
64
8
5 0.7
-1.907
53
0.0801
03.14
4
03.A
-0.
1
-0.130
ETABS 18.1.1
03.1503.15
03.C03.C'
-13.8054
9
-14.723
11.5339
17.7431
5
-11.496
-7.9877
-4.8474
-2.0759
0.327
2.3612
4.0268
5.3238
6.2521
6.8117
0027
7.00
7. 27
6.8251
6.6332
6.6677
6.6191
(DL) [tonf-m]
6.2363
5.4849
4.3648
2.876
1.0186
-1.2074
-3.8798
-13.7981
03.15
03.B
-17.1862
34
-15.75
1.1742
75
-12.60
3
-9.086
3
-5.878
6
-2.983
-20.6878
-13.4882
8
-11.516
91
-15.25
85
-18.7-96.113 7
10.5107
45
2
3 1.2
-2.71036 0.3256
99
03.15
6
03.A
-0.37 -0.
1
-0.130
1.725E-05
ETABS 18.1.1
03.1603.16
03.C03.C'
-13.2133
2
-13.839
7.7708
12.9128
8
-10.502
-6.8865
-3.6642
-0.8358
1.6013
3.6391
5.2825
6.5312
7.3851
7.8441
7.9196
7.9131
7.5824
621
.055
77.0
6.8783
(DL) [tonf-m]
6.2981
5.3211
3.9471
2.1756
0.0034
-2.5436
-12.5644
-8.1377
-16.7022
03.16
03.B
-20.4839
45
-16.34
3.5279
58
-13.35
7
-10.04
5
-7.076
2
-4.445
03.16
03.A
-0.195
ETABS 18.1.1
03.C03.C'
04.2 04.2
-14.8403
7
-15.866
12.9479
19.7573
5
-12.402
-8.6435
-5.2832
-2.3214
0.239
2.4064
4.1756
5.5469
6.5206
7.0966
2753
7.27
7. 01
7.0507
6.8768
6.9311
6.9022
(DL) [tonf-m]
6.5387
5.7793
4.6246
3.0746
1.133
-1.1834
-2.0533
-14.4033
03.B
04.2
-17.9739
64
-17.93
88
-14.43
02
-10.52
3
-6.940
5
-3.698
9
-0.793
-22.1206
-14.4817
3
-11.772
41
-15.86
5
.71
-19-1 .69612
15.0556
2
-0.741
03.A
04.2
6
-0.139
0.0409
ETABS 18.1.1
03.1703.17
03.C03.C'
-12.9799
9
-13.716
9.2134
14.6518
6
-10.556
-7.1278
-4.0677
-1.3762
0.9466
2.9008
4.4864
5.7033
6.5515
7.0311
.142
77.1 42
6.8843
6.553
6.5577
6.4793
(DL) [tonf-m]
6.037
5.226
4.0463
2.498
0.5811
-1.7045
-7.7031
-14.5334
03.17
03.B
-17.9715
73
-14.66
2.8435
5
-11.810
3
-8.639
5
-5.781
9
-3.236
03.17
03.A
2
-0.130
ETABS 18.1.1
03.1803.18
03.C03.C'
-12.6205
7
-13.407
9.9166
15.4392
3
-10.398
-7.1313
-4.2147
-1.6486
0.567
2.4322
3.9469
5.1111
5.9249
6.3882
0111
6.5501
6.
6.2635
6.0571
6.1142
6.0883
(DL) [tonf-m]
5.769
5.0993
4.0791
2.7084
0.9873
-1.0843
-12.8752
03.18
03.B
-16.0576
03
-13.06
2.6212
66
-10.32
-7.288
-4.546
5
-2.100
-18.0411
-11.8346
4
-9.706
5
-12.96
94
-16-7.0.83171 2
8.8541
54
1
5 1.0
-2.329
98
0.2623
03.18
5
03.A
-0.
-0.1144
2.718E-05
ETABS 18.1.1
03.1803.18
03.C03.C'
3.6817
3.6817
-3.1885
-2.9349
-2.6353
-2.3357
-2.0361
-1.7365
-1.4369
-1.1373
-0.8377
-0.5381
-0.2385
0.0455
0.3451
0.4683
0.6447
0.1687
-0.1154
(DL) [tonf]
-0.415
-0.7146
-1.0142
-1.3138
-1.6134
03.B
-3.365
-1.0983
-1.0983
2
-3.187
7
-2.956
8
-2.680
-2.405
1
-2.129
-4.1377
-4.1377
6
4.7041
88
03.18
03.A
0.7
0.2096
ETABS 18.1.1
03.1703.17
03.C03.C'
3.6256
3.6256
-3.3424
-3.0732
-2.7581
-2.4429
-2.1278
-1.8126
-1.4975
-1.1823
-0.8672
-0.552
-0.2369
0.0472
0.3623
0.3942
0.6775
0.079
-0.205
(DL) [tonf]
-0.5202
-0.8353
-1.1505
-1.4656
-1.7808
03.B
-3.6257
-3.326
-1.3838
-1.3838
-3.08
6
-2.788
2
-2.497
8
-2.205
03.17
03.A
0.2251
ETABS 18.1.1
03.C03.C'
04.2 04.2
4.5396
4.5396
-3.6399
-3.3471
-3.0084
-2.6696
-2.3309
-1.9921
-1.6534
-1.3146
-0.9759
-0.6371
-0.2983
0.3245
0.5147
0.6632
0.1759
-0.1081
(DL) [tonf]
-0.4469
-0.7856
-1.1244
-1.4631
-1.8019
-3.77
-0.2545
-0.2545
1
-4.036
5
-3.766
6
-3.451
7
-3.136
7
-2.821
8
-2.506
-5.0926
-5.0926
0.663
03.A
04.2
0.3007
ETABS 18.1.1
03.1603.16
03.C03.C'
3.428
3.428
-3.5346
-3.2418
-2.903
-2.5643
-2.2255
-1.8868
-1.548
-1.2093
-0.8705
-0.5317
-0.193
0.0911
0.4298
0.3175
0.7686
-0.3053
(DL) [tonf]
-0.644
-0.9828
-1.3215
-1.6603
-1.999
03.B
-3.9672
4
-3.486
-1.9057
-1.9057
9
-3.216
9
-2.901
-2.587
-2.272
03.16
03.A
0.2486
ETABS 18.1.1
03.1503.15
03.C03.C'
4.1395
4.1395
-3.4108
-3.1417
-2.8265
-2.5114
-2.1962
-1.8811
-1.5659
-1.2508
-0.9356
-0.6205
-0.3053
0.2939
0.4451
0.609
0.1299
-0.1541
(DL) [tonf]
-0.4693
-0.7844
-1.0996
-1.4147
-1.7299
03.B
-3.5748
-0.6631
-0.6631
7
-3.651
6
-3.405
2
-3.114
8
-2.822
4
-2.531
-4.7998
-4.7998
8
5.4982684
24
03.15
03.A
0.9
0.4
0.2251
ETABS 18.1.1
03.1503.15
03.C03.C'
-8.7887
-9.3643
7.3226
11.2706
-7.2861
-5.0298
-3.0164
-1.246
0.2814
1.5659
2.6075
3.4061
3.9617
4.2744
4.34
4. 42
3442
4.171
4.0549
4.1138
4.112
(LL) [tonf-m]
3.9262
3.4974
2.8257
1.911
0.7534
-0.6472
-8.679
03.15
03.B
-10.8545
-9.787
0.9011
8
-7.806
4
-5.595
6
-3.588
6
-1.786
-12.5816
-7.0011
-8.1995
4
-9.340
-11-5 401149
.5.6 4
66
6.4073
3
9 0.7
-1.69243 0.1639
28
03.15
4
03.A
-0.26 -0.
5
-0.091
1.1E-05
ETABS 18.1.1
03.1603.16
03.C03.C'
-7.9559
-8.3227
4.6201
7.7018
-6.3021
-4.1117
-2.1628
-0.4556
1.0118
2.2343
3.2149
3.9535
4.4501
4.7044
4.7421
4.7195
4.4898
7935
.175
44.1
4.1025
(LL) [tonf-m]
3.7825
3.2192
2.4125
1.3622
0.0662
-1.4728
-10.0627
03.16
03.B
-12.3594
4
-9.677
2.3006
4
-7.883
5
-5.895
-4.1121
7
-2.533
03.16
03.A
-0.1187
ETABS 18.1.1
03.C03.C'
04.2 04.2
-8.9021
-9.5041
7.6634
11.7227
-7.41
-5.1378
-3.1099
-1.3262
0.2114
1.508
2.5605
3.3692
3.934
4.2551
4.33
4. 96
3226
4.163
4.0568
4.1114
4.1052
(LL) [tonf-m]
3.9149
3.482
2.8066
1.8889
0.731
-0.6699
-1.507
-8.6983
03.B
04.2
-10.8689
22
-10.64
0.1215
4
-8.556
1
-6.219
7
-4.086
7
-2.158
6
-0.434
-13.2536
4
-8.6817
-6.991
2
-9.434
36.9347
-11.7-0
8.9961
2
-0.406
03.A
04.2
3
-0.064
0.0272
ETABS 18.1.1
03.1703.17
03.C03.C'
-8.31
-8.773
5.8706
9.3455
-6.7295
-4.5147
-2.5428
-0.8138
0.6722
1.9153
2.9154
3.6725
4.1867
4.458
4.5025
4.4863
4.2717
4.0613
4.0937
4.0655
(LL) [tonf-m]
3.8267
3.345
2.6204
1.6528
0.4422
-1.0113
-9.2548
03.17
03.B
-11.4747
7
-9.298
1.8812
-7.469
9
-5.439
5
-3.615
7
-1.995
03.17
03.A
5
-0.091
ETABS 18.1.1
03.1803.18
03.C03.C'
-8.6623
-9.2038
6.8682
10.6739
-7.1343
-4.8886
-2.8857
-1.1259
0.391
1.665
2.696
3.4841
4.0292
4.3313
4.3913
4.3906
4.2068
4.0745
4.1306
4.1259
(LL) [tonf-m]
3.9344
3.4999
2.8225
1.9022
0.7388
-0.6674
-3.8079
-8.722
03.18
03.B
-10.9023
4
-8.851
1.8025
6
-6.992
1
-4.928
2
-3.068
1
-1.413
-11.9414
6
-7.8287
-6.457
-8.6611
-10-5 424938
.7.2 7
07
5.8803
4
3 0.7
-1.589
99
0.135
03.18
3
03.A
-0.
5
-0.091
1.726E-05
ETABS 18.1.1
03.1803.18
03.C03.C'
2.5371
2.5371
-2.1978
-2.0237
-1.816
-1.6083
-1.4006
-1.1929
-0.9852
-0.7775
-0.5698
-0.3622
-0.1545
0.0532
0.2609
0.3555
0.4686
0.1478
-0.0599
(LL) [tonf]
-0.2676
-0.4753
-0.683
-0.8906
-1.0983
03.B
-2.3109
-0.7361
-0.7361
8
-2.172
6
-2.015
2
-1.825
8
-1.634
4
-1.444
-2.7418
-2.7418
3.1341
03.18
03.A
0.18
ETABS 18.1.1
03.1703.17
03.C03.C'
2.3166
2.3166
-2.1714
-1.9973
-1.7896
-1.5819
-1.3742
-1.1665
-0.9588
-0.7511
-0.5434
-0.3357
-0.128
0.0796
0.2873
0.3151
0.495
0.1074
-0.1003
(LL) [tonf]
-0.308
-0.5156
-0.7233
-0.931
-1.1387
03.B
-2.3513
9
-0.8956
-0.8956
-2.139
7
-1.982
3
-1.792
9
-1.601
5
-1.411
03.17
03.A
0.18
ETABS 18.1.1
03.C03.C'
04.2 04.2
2.7062
2.7062
-2.2155
-2.0414
-1.8337
-1.626
-1.4183
-1.2106
-1.0029
-0.7952
-0.5875
-0.3798
-0.1722
0.0355
0.2432
0.3601
0.4509
0.1524
-0.0552
(LL) [tonf]
-0.2629
-0.4706
-0.6783
-0.886
-1.0937
-2.3062
-0.2137
-0.2137
5
-2.421
3
-2.264
9
-2.073
5
-1.883
2
-1.693
8
-1.502
-3.0479
-3.0479
0.405
03.A
04.2
0.18
ETABS 18.1.1
03.1603.16
03.C03.C'
2.0545
2.0545
-2.1554
-1.9813
-1.7737
-1.566
-1.3583
-1.1506
-0.9429
-0.7352
-0.5275
-0.3198
-0.1121
0.0956
0.3033
0.2421
0.511
0.0344
-0.1733
(LL) [tonf]
-0.381
-0.5887
-0.7964
-1.0041
-1.2118
03.B
-2.4243
6
-2.106
-1.1962
-1.1962
4
-1.949
-1.759
6
-1.568
2
-1.378
03.16
03.A
0.18
ETABS 18.1.1
03.1503.15
03.C03.C'
2.632
2.632
-2.2068
-2.0327
-1.825
-1.6173
-1.4096
-1.2019
-0.9942
-0.7866
-0.5789
-0.3712
-0.1635
0.0442
0.2519
0.3604
0.4596
0.1527
-0.055
(LL) [tonf]
-0.2627
-0.4704
-0.6781
-0.8858
-1.0935
03.B
-2.306
-0.4498
-0.4498
5
-2.309
3
-2.152
9
-1.961
5
-1.771
1
-1.581
-2.9214
-2.9214
3.37106
03.15
03.A
0.3
0.18
ETABS 18.1.1
IX.2b Output Analisa Statik Akibat Beban Gempa
Arah-X
ETABS 18.1.1
-0 .
00
01
01
051 -0.00
0 .0
-0.0001
108
00
166
-0.0
224
2
-0.0
-0.0003
0.0001
282
14
-0.0
011334
0.00
-0.0
0.00
-0.0
-0.00
0.01
-0.0
65
0.01
034
-0.0
16
0.02
-0.0 3
48
-0.0202
00
-0.0056
-0.0047
0.02
63
-0.002
.0
1
0.03
00
1
0.00
-0
-0.0225
00-035
-0.0061
0.0
57
0.0146 --0.0001
0.0191
9E
77
.0
0.01194
0.0018
2.101
0.0551 0.0545
0
0.0314
00
0.
-0.0198
-0.0221 -0.0208
2021.02.26_Heinz ABC-str atas-16.25.EDB Elevation View - 03.31 Moment 3-3 Diagram (EQX0) [tonf-m]
ETABS 18.1.1
048
151
-0.0
202
-0.0
253
1
-0.0
0.00
0.00
-0.0
-0.0
-0.00
0.01
0037
-0.0
59
0.01
028
-0.0
0.01
03
-0.0 2
38
00
-0.0046
-0.0038
-0.0017
0.02
47
-0.017
.0
1
0.02
91
-0.016400
0.00
0
-0.0205
-0.0052
5-
0.0
35
5E-0
0.0124 0.05 --0.0001
0.0159
75
65
0.00984
0.0013
0.0468
0
0.0519
0.0261
4.47
00
0.
-0.0184
-0.0179
-0.0188
2021.02.26_Heinz ABC-str atas-16.25.EDB Elevation View - 03.32 Moment 3-3 Diagram (EQX0) [tonf-m]
ETABS 18.1.1
0.00
0.00
0.00
32
0.00
32
37
0.00
32
37
0.00
-0.00
32
37
05
0.01
-0.00
32
37
-0.00
32
0.00
37
-0.00
6
0.0134
37
-0.00
4
00
0.01
-0.00
.0
-0.01 0206
0.0159 05 0.0531
-3.366E-05
E- 0.0239
-0.0
91
-0.0022
0.0528
-0.0074
1.8
-
-0.0129
-0.0145
0.0012 -0.0003
2021.02.26_Heinz ABC-str atas-16.25.EDB Elevation View - 03.32 Shear Force 2-2 Diagram (EQX0) [tonf]
ETABS 18.1.1
0.0
00 0.003
1
5
E-0
0.00
6
0.00
-0.0001 0.0001
38
3
0.00
34
-3 .
41
0.00
34
42
0.00
-0.00
34
0.01
42
11
-0.00
34
42
-0.00
34
0.00
92
42
-0.00
0.0161
0.0119
42
-0.00
4
00
-0.00
.0
-0.012 0303
0.0187 05
-4.74E-05
E- 0.055 0.0287
-0.0
37
-0.0092
-0.0025
0.0606
1.5
-
-0.0152 -0.0149
-0.001 -0.0007
2021.02.26_Heinz ABC-str atas-16.25.EDB Elevation View - 03.31 Shear Force 2-2 Diagram (EQX0) [tonf]
03.1503.15
03.C03.C'
-0.1706
-0.2157
0.5876
0.8171
-0.2062
-0.1949
-0.1836
-0.1723
-0.1609
-0.1496
-0.1383
-0.127
-0.1156
-0.1043
-0.093
-0.0817
-0.0704
(EQX0) [tonf-m]
-0.0386
-0.0068
0.0249
0.0567
0.0885
0.1202
0.152
0.3108
03.15
03.B
0.3374
0.7158
1.0175
6
-0.073
2
-0.087
8
-0.100
-0.1144
-0.2989
9 0.4931
35
0. 546
0.2588
0
-0.
0.711
1.0602
0.0689
03.15
03.A
-0 .0218092
-0.0 7
6
-0.003
18
0.0
ETABS 18.1.1
03.1603.16
03.C03.C'
-0.2166
-0.274
0.7477
1.0276
-0.2619
-0.2475
-0.2332
-0.219
-0.2049
-0.1907
-0.1767
-0.1627
-0.1487
-0.1347
-0.1208
-0.1069
-0.0929
(EQX0) [tonf-m]
-0.0512
-0.0096
0.0322
0.0739
0.1155
0.1572
0.1989
0.4083
03.16
03.B
0.4436
0.8981
1.2591
2
-0.044
9
-0.061
7
-0.079
4
-0.097
03.16
03.A
38
2 0.00
-0.000
0.004
ETABS 18.1.1
ETABS 18.1.1
-0.336
7
-0.0925
9
-0.263
-0.1031
-0.0465
-0.336
-0.082
-0.308
-0.0109
-0.1136
6
-0.281
-0.1165
-0.1242
-0.1347
-0.042
-0.253
-0.1451
-0.19
-0.226
-0.1556
-0.198
-0.1659
-0.171
-0.1763
8
-0.143
-0.1865
5
4
-0.116
-0.1968
-0.088
-0.2069
5
-0.061
-0.2153
9
-0.033
9
-0.061
-0.005
0.0245
-0.030
0.06
-0.008
0.0312
0.0956
0.1051
0.1311
0.1792
0.1666
0.2537
0.202
0.3286
0.2374
0.404
0.2727
5
0.48
0.308
6
0.3432
0.0166
9
0.5566
0.3726
0.6244
2021.02.26_Heinz ABC-str atas-30.EDB Elevation View - 04.2 Moment 3-3 Diagram (EQX0) [tonf-m]
03.1703.17
03.C03.C'
-0.2066
-0.2615
0.7161
0.9858
-0.2503
-0.2368
-0.2234
-0.21
-0.1966
-0.1832
-0.1698
-0.1563
-0.1429
-0.1295
-0.1161
-0.1027
-0.0893
(EQX0) [tonf-m]
-0.0494
-0.0095
0.0304
0.0703
0.1102
0.1501
0.19
03.B
0.4229
0.8646
1.2152
4
-0.049
7
-0.062
1
-0.076
4
-0.089
03.17
03.A
6
-0.003
2.114E-06
ETABS 18.1.1
03.1803.18
03.C03.C'
-0.163
-0.2077
0.5852
0.8122
-0.1995
-0.1897
-0.1799
-0.1701
-0.1603
-0.1505
-0.1407
-0.1309
-0.1211
-0.1113
-0.1015
-0.0917
-0.0819
(EQX0) [tonf-m]
-0.0482
-0.0144
0.0194
0.0532
0.087
0.1207
0.1545
0.3234
03.18
03.B
0.3517
0.7293
1.0367
8
-0.070
2
-0.085
7
-0.099
-0.1142
-0.3035
5 0.5051
36
0.5594
0.2647
0
-0.
0.7248
1.0796
0.0711
03.18
03.A
6
-0.029 1
1
-0.003
19
0.0
ETABS 18.1.1
03.1803.18
03.C03.C'
0.1513
0.1222
-0.0084
-0.0084
-0.0084
-0.0084
-0.0084
-0.0084
-0.0084
-0.0084
-0.0084
-0.0084
-0.0084
-0.0084
-0.0084
(EQX0) [tonf]
0.0289
0.0289
0.0289
0.0289
0.0289
0.0289
0.0289
03.18
03.B
0.0289
0.0135
0.0135
0.0135
0.0135
0.0135
0.2365
0.2057
0.0581
0.0581
-0.1713
-0.18
03.18
59
03.A
0.0104
02
- 0.
0.0031
ETABS 18.1.1
03.1703.17
03.C03.C'
0.1507
0.1798
-0.0115
-0.0115
-0.0115
-0.0115
-0.0115
-0.0115
-0.0115
-0.0115
-0.0115
-0.0115
-0.0115
-0.0115
-0.0115
(EQX0) [tonf]
0.0341
0.0341
0.0341
0.0341
0.0341
0.0341
0.0341
03.17
03.B
0.0341
0.0124
0.0124
0.0124
0.0124
0.0124
03.17
03.A
0.0112
0.0035
ETABS 18.1.1
ETABS 18.1.1
0.0689
0.0254
0.0302
0.0689
0.0254
0.0302
0.0689
0.0254
0.0302
0.0689
0.0254
0.0302
0.0689
0.0302
0.0254
0.0689
0.0254
0.0302
0.0689
0.0254
0.0302
0.0689
0.0302
0.0254
0.0689
0.0254
0.0302
0.0689
0.0254
0.0302
0.0689
0.0302
0.0254
0.0689
-0.0089
0.0254
0.0302
0.0689
0.0302
-0.0089
0.0254
-0.0089
0.0237
-0.0089
0.0139
-0.0089
0.0049
-0.0089
-0.0089
-0.0089
-0.0089
-0.0089
-0.0089
-0.0089
-0.0089
0.1256
0.2348 0.1648
2021.02.26_Heinz ABC-str atas-30.EDB Elevation View - 04.2 Shear Force 2-2 Diagram (EQX0) [tonf]
03.1603.16
03.C03.C'
0.1866
0.1575
-0.012
-0.012
-0.012
-0.012
-0.012
-0.012
-0.012
-0.012
-0.012
-0.012
-0.012
-0.012
-0.012
(EQX0) [tonf]
0.0358
0.0358
0.0358
0.0358
0.0358
0.0358
0.0358
03.16
03.B
0.0358
0.0167
0.0167
0.0167
0.0167
0.0167
03.16
03.A
0.0125
0.0041
ETABS 18.1.1
03.1503.15
03.C03.C'
0.1239
0.153
-0.0097
-0.0097
-0.0097
-0.0097
-0.0097
-0.0097
-0.0097
-0.0097
-0.0097
-0.0097
-0.0097
-0.0097
-0.0097
(EQX0) [tonf]
0.0272
0.0272
0.0272
0.0272
0.0272
0.0272
0.0272
0.172
03.15
03.B
0.0272
0.0127
0.0127
0.0127
0.0127
0.0127
0.2328
0.0566
0.202
0.0566
-0.1681
-0.1748
03.15
54
03.A
02
0.0093 - 0.
0.0035
ETABS 18.1.1
IX.2c Output Analisa Statik Akibat Beban Gempa
Arah-Y
ETABS 18.1.1
-0 .
00
03 -0.0001
-0.00
0 .0 3 023
026
2
0
00
-0.0
00
0.0002 0.0001
013
2
1
-0.0
0.0
-0.0002 -0.0008
-0.0
0.00
-0.00
22
-05
0.00
.00000
03
0.00
13
4E
04
--00.0
-0.0014
-0.0019
5
-0.0011
-0.0001
07
0.00
0.00
-0
26
--0.001
3.32
4E
0.0
11
0.00
6
0.00
-0.0006 0.0023
4. 0.00308
0.0005
33
-2.288E-05
15
5
06
01088
0.00
2.
9E-0
-0.0003 3.914E-056 -0.001
E-
-0
63
0.0017 -0.0029
0.0007
E
0.0014
75
2.77
7
8.
-0.0012 0.0022
2021.02.26_Heinz ABC-str atas-16.25.EDB Elevation View - 03.31 Moment 3-3 Diagram (EQY0) [tonf-m]
ETABS 18.1.1
021
-0.00
-0.00
05
-0.00
-0.0
08
013 7
-0.0
0.00
73
-0.0
-0.0-0.010
09
39
0.00
-0.0
-0.00
35
0.00
09
0.00
08425
61
73
0.00
00025
0.00
43
-0.0 E-
17
82
05
-0.0034
-0.0013
-0.0002
E-
.2
-0.006569
0.00
-2
0.0042
0033
-0.0012 4.402E-05
2.0
00.0.000
0.0005 0.0086 --0.0001
0.0028
11
0.00251
-0.0055
0
0.0037
0.0032
0.0097
0.0054
00
0.
-0.0031
0.0041 -0.0071
2021.02.26_Heinz ABC-str atas-16.25.EDB Elevation View - 03.32 Moment 3-3 Diagram (EQY0) [tonf-m]
ETABS 18.1.1
-0.00
21
-0.00
21
-0.00
0.00
15
21
-0.00
-0.00
19
21
0.00
-0.0
-0.00
55
19
0.0089
21
-0.00
-0.00
0.0028
19
21
-0.00
019
1
-0.00
00
-0.00
.0
-0.0023 0005
19
0.0015 06 0.0121 0.0038
-0.0001
19
E-
-0.0
67
-0.0013
-0.005
-0.0019
4.0
-
0.0015
-0.0026
0.0015 -0.0026
2021.02.26_Heinz ABC-str atas-16.25.EDB Elevation View - 03.32 Shear Force 2-2 Diagram (EQY0) [tonf]
ETABS 18.1.1
1
03 .000
0
-0. 13
0.00
00
09
0.00
0.00
09
02
0.00
0.00
-0.0003 -0.0006
09
0.00
0.00
03
09
0.00
0.00
03
09
0.00
0.00
03
0.00
03
02
03
6
0.00
-0
05 0.0008
0.0006
23 0.0006
5E
54
008
1.
-0.0007 -0.00 0.0001
-1 -0.0
-0.0013
0.0007 -0.0037
19
E-
-0.001
-0.0034
.7
-0.0004 0.0008
-0.0004 0.0008
2021.02.26_Heinz ABC-str atas-16.25.EDB Elevation View - 03.31 Shear Force 2-2 Diagram (EQY0) [tonf]
03.1503.15
03.C03.C'
-0.1416
-0.1068
0.0353
0.0436
0.0412
0.0383
0.0354
0.0325
0.0296
0.0268
0.0239
0.021
0.0181
0.0153
0.0124
0.0095
0.0066
(EQY0) [tonf-m]
0.0015
-0.0037
-0.0088
-0.014
-0.0191
-0.0243
-0.0294
-0.0552
03.15
03.B
-0.0595
-0.017
6
0.0326
-0.0114
9
-0.003
0.0036
-0.2181
7
-0.1516
-0.105
5
-0.122
-0.137 8
-0.062 5
0.0699
08
5
8 0.0
-0.017 0.0045
04
03.15
0
03.A
-0.
E-06
-1.747
E-07
-8.524
ETABS 18.1.1
03.1603.16
03.C03.C'
-0.052
-0.0655
0.1746
0.2301
-0.0619
-0.0579
-0.054
-0.0503
-0.0466
-0.0431
-0.0396
-0.0362
-0.0329
-0.0296
-0.0264
-0.0233
-0.0198
(EQY0) [tonf-m]
-0.0108
-0.0018
0.0076
0.0166
0.0256
0.0347
0.0438
0.0914
03.16
03.B
0.0998
0.2123
0.2889
7
-0.037
3
-0.057
-0.077
7
-0.096
03.16
03.A
0.0076
0.0037
ETABS 18.1.1
03.C03.C'
04.2 04.2
-0.1212
-0.0915
0.0296
0.0367
0.0342
0.0316
0.029
0.0266
0.0243
0.022
0.0199
0.0178
0.0158
0.0139
0.012
0.0102
0.008
(EQY0) [tonf-m]
0.0036
-0.0013
-0.0058
-0.0103
-0.0148
-0.0193
-0.024
-0.0489
03.B
04.2
-0.0535
-0.009
5
0.0362
5
-0.005
6
-0.000
0.0001
0.005
0.0101
-0.1749
-0.086
-0.1239
1
-0.099
8
-0.109
0.0731
-0.0
-0 0756
.011
03.A
04.2
7
-0.003
ETABS 18.1.1
ETABS 18.1.1
0
0
03.A
03.17
0
0.0001
-0.000
1
-0.000
2
-0.000
3
-0.000
5
-0.000
6
-0.000
7
0.0013
03.B
03.17
0.0003
0.0004
0.0005
0.0006
0.0007
0.0013
0.001
0.0007
0.0004
0.0001
-0.0002
-0.0005
-0.0007
-0.001
-0.0013
-0.0016
-0.0019
-0.0022
0.005
0.0036
-0.0024
-0.0021
03.C03.C'
03.1703.17
ETABS 18.1.1
-0.0222
-0.0228
-0.047
-0.0234
-0.0148
-0.062
-0.062
7
-0.033
-0.0075
-0.056
-0.0001
-0.051
-0.0246
4
-0.024
-0.0252
-0.004
-0.046
-0.019
-0.0258
-0.041
-0.0311
-0.0264
-0.036
-0.0275
-0.026
-0.027
7
-0.0281
7
-0.020
-0.0287
5
3
-0.015
-0.0293
-0.010
-0.0298
2
-0.005
6
-0.000
0.0072
0.0097
0.0146
-0.005
0.024
0.022
0.0384
0.0293
0.0527
0.0367
0.0671
0.044
0.0814
0.0514
1
0.0958
0.0588
08
0.0661
0.004
0
0.1101
0.0723
0.
0.0604
0
0.0166
-0.057 -0.0225
-0.
1226
5
0
0.0
-0.0624
2021.02.26_Heinz ABC-str atas-30.EDB Elevation View - 03.18 Moment 3-3 Diagram (EQY0) [tonf-m]
ETABS 18.1.1
0.0133
0.0048
0.0063
0.0133
0.0063
0.0048
0.0133
0.0048
0.0063
0.0133
0.0048
0.0063
0.0133
0.0063
0.0048
0.0133
0.0048
0.0063
0.0133
0.0048
0.0063
0.0133
0.0063
0.0048
0.0133
0.0048
0.0063
0.0133
0.0048
0.0063
0.0133
0.0063
0.0048
0.0133
-0.0005
0.0048
0.0063
0.0133
-0.0005
0.0063
0.0048
-0.0005
-0.0005
-0.0005
-0.0005
-0.0005
-0.0005
-0.0005
-0.0005
-0.0005
-0.0005
-0.0005
-0.0387
-0.0387
61
0.0197
00
- 0.
0.0415 0.0305
2021.02.26_Heinz ABC-str atas-30.EDB Elevation View - 03.18 Shear Force 2-2 Diagram (EQY0) [tonf]
ETABS 18.1.1
0.0002
0.0001
0.0001
0.0002
0.0002
0.0001
0.0002
0.0001
0.0001
0.0002
0.0002
0.0001
0.0002
0.0001
0.0001
0.0002
0.0002
0.0001
0.0002
0.0001
0.0001
0.0002
0.0002
-0.0001
0.0001
-0.0002
0.0002
-0.0001
0.0001
-0.0002
-0.0001
-0.0002
-0.0001
-0.0002
-0.0001
-0.0002
-0.0001
-0.0002
-0.0001
-0.0002
-0.0001
-0.0002
-0.0001
-0.0002
-0.0001
-0.0002
-0.0001
-0.0002
-0.0001
-0.0002
-0.0001
-0.0002
0.0009
4.109E-05
4.109E-05 0.0009
2021.02.26_Heinz ABC-str atas-30.EDB Elevation View - 03.17 Shear Force 2-2 Diagram (EQY0) [tonf]
03.C03.C'
04.2 04.2
0.0018
-0.0198
-0.0198
0.0018
0.0018
0.0018
0.0018
0.0018
0.0018
0.0018
0.0018
0.0018
0.0018
0.0018
0.0018
-0.0042
(EQY0) [tonf]
-0.0042
-0.0042
-0.0042
-0.0042
-0.0042
-0.0042
-0.0224
-0.0224
2
-0.005
2
-0.005
2
-0.005
2
-0.005
-0.034
-0.034
03.A
04.2
ETABS 18.1.1
ETABS 18.1.1
0.0248
0.0189
0.0248
0.0189
0.0248
0.0189
0.008
0.0248
0.0189
0.008
0.0248
0.0189
0.008
0.0248
0.0189
0.008
0.0248
0.0189
0.008
0.0248
0.0189
0.008
0.0248
0.0189
0.008
0.0248
0.0189
0.008
0.0248
0.0189
0.008
0.0248
0.0189
0.008
-0.003
0.0248
0.0189
0.008
-0.003
-0.003
0.008
0.008
-0.003
-0.003
-0.003
-0.003
-0.003
-0.003
-0.003
-0.003
-0.003
-0.003
0.037
0.051
0.051 0.037
2021.02.26_Heinz ABC-str atas-30.EDB Elevation View - 03.16 Shear Force 2-2 Diagram (EQY0) [tonf]
03.1503.15
03.C03.C'
-0.0232
-0.0232
0.0025
0.0025
0.0025
0.0025
0.0025
0.0025
0.0025
0.0025
0.0025
0.0025
0.0025
0.0025
0.0025
(EQY0) [tonf]
-0.0044
-0.0044
-0.0044
-0.0044
-0.0044
-0.0044
-0.0044
03.B
-0.0234
-0.0234
-0.007
-0.007
-0.007
-0.007
-0.0443
-0.0443
03.15
0.0398
03.A
ETABS 18.1.1
X. PERHITUNGAN STRUKTUR BAJA DAN BETON
Pengecekan Stress Ratio
ETABS 18.1.1
6 0.14
0.14 7
0.08
3
0.16 7
0.11
6
9 0.17 7
0.11
0.16 7
0.12
4
0.12 8
0.33
4
2
0.35 6
0.19
0.675
0.17 6
0.166
0.094
00. .098
0.
0.222
17
14
5
2
0.241 0.131 0.170 0.302 0.559
0.426
0.504
0.00 0.50 0.70 0.90 1.00
2021.02.26_Heinz ABC-str atas-16.25.EDB Elevation View - 03.32 Steel P-M Interaction Ratios (AISC 360-10)
ETABS 18.1.1
9 3 0.20
0.1 1
0.0
59 58
0.159
0.167
0.0
1 0.14
0.17 3
0.16
2
0.23 0
0.16
2
6 0.23 0
0.14
0.18 0
0.24
9
0.24 3
0.50
3
4
0.53 4
0.27
0.20 7
0.220
0.105
00. .138
0.
0.323
20
16
3
4
0.510 0.196 0.206 0.392 0.847
0.584
0.609
0.00 0.50 0.70 0.90 1.00
2021.02.26_Heinz ABC-str atas-16.25.EDB Elevation View - 03.31 Steel P-M Interaction Ratios (AISC 360-10)
ETABS 18.1.1
8 9 0.29
0.2 6
0.0
63 62
0.234
0.227
0.0
3 0.14
0.19 4
0.19
1
0.26 0
0.19
1
2 0.26 1
0.14
0.19 9
0.28
6
0.29 6
0.56
6
9
0.59 2
0.30
0.20 2
0.264
0.115
00. .142
0.
0.358
21
16
8
8
0.602 0.215 0.253 0.424 0.940
0.639
0.643
0.00 0.50 0.70 0.90 1.00
2021.02.26_Heinz ABC-str atas-16.25.EDB Elevation View - 03.30 Steel P-M Interaction Ratios (AISC 360-10)
ETABS 18.1.1
0.347
0.330 0.325 0.340 0.425 0.437 0.455
0.347 0.340 0.430 0.455
0.327 0.429 0.448
0.335 09
0.249
0.300 0.293
0.239 0.364 0.4 0.415
0.357
0.162 0.292 0.272
0.179 0.119 0.195 0.161
0.130 0.261 0.150 0.210
0.247 0.425 0.326 0.399
0.410 0.528
0.596
0.596 0.613
0.613 0.757
0.757 0.616
0.616
00..452
0.136 42
2
0.839
0.515
0.974
0.00 0.50 0.70 0.90 1.00
2021.02.26_Heinz ABC-str atas-30.EDB Elevation View - 03.12 Steel P-M Interaction Ratios (AISC 360-10)
ETABS 18.1.1
0.375
0.366 0.360 0.370
0.442 0.437 0.452 0.471
0.375 0.370 0.441 0.471
0.354 0.351 0.420 0.465
0.317 0.313 0.372 0.432 0.3
0.256 0.253 0.297 73
0.186 0.173 0.196 0.286 0.1
0.138 0.124 0.162 72
0.278 0.267 0.345 0.208 0.402
0.451 0.441 0.555
0.649 0.649 0.639
0.639 0.792
0.792 0.625
0.625
0.143
00.4.487
55
0.927
0.559
0.989
0.00 0.50 0.70 0.90 1.00
2021.02.26_Heinz ABC-str atas-30.EDB Elevation View - 03.13 Steel P-M Interaction Ratios (AISC 360-10)
ETABS 18.1.1
0.408
0.408 0.411 0.411
0.447 0.443 0.460 0.479
0.400 0.406 0.445 0.479
0.370 0.381 0.420 0.472
0.325 0.337 0.369 0.439 0.3
0.259 0.271 0.292 78
0.166 0.183 0.188 0.292 0.1
0.150 0.125 0.174 77
0.308 0.278 0.360 0.205 0.400
0.491 0.459 0.572
0.696 0.696 0.664
0.664 0.813
0.813 0.624
0.624
0.139
00.4.526
88
0.988
0.564
0.987
0.00 0.50 0.70 0.90 1.00
2021.02.26_Heinz ABC-str atas-30.EDB Elevation View - 03.14 Steel P-M Interaction Ratios (AISC 360-10)
ETABS 18.1.1
0.520
0.520 0.511 0.512
0.451 0.449 0.471 0.490
0.488 0.483 0.447 0.490
0.445 0.445 0.417 0.482
0.382 0.381 0.361 0.447 0.3
0.299 0.296 0.279 86
0.186 0.188 0.169 0.297 0.1
0.168 0.134 0.196 82
0.343 0.311 0.386 0.200 0.397
0.545 0.510 0.604
0.766 0.775 0.734
0.734 0.849
0.849 0.621
0.621
0.819
0.6 0.203
0.708
0.031
0.133
28
0.558
0.992
0.893
0.453
0.380 0.314 0.316
0.448 0.443 0.461 0.486
0.518 0.313 0.447 0.489
0.558 0.301 0.424 0.485
0.579 0.262 0.372 0.454 0.3
0.580 0.201 0.294 97
0.576 0.137 0.186 0.310 0.1
0.531 0.215 0.201 94
0.476 0.372 0.392 0.193 0.392
0.397 0.554 0.611
0.184 0.301 0.760
0.761 0.858
0.858 0.620
0.620
0.066 0.186
0.207
0.587
0.994
0.00 0.50 0.70 0.90 1.00
2021.02.26_Heinz ABC-str atas-30.EDB Elevation View - 03.16 Steel P-M Interaction Ratios (AISC 360-10)
ETABS 18.1.1
0.466
0.391 0.327 0.328
0.447 0.445 0.466 0.488
0.525 0.323 0.443 0.488
0.566 0.299 0.415 0.483
0.587 0.259 0.359 0.452 0.3
0.587 0.196 0.277 93
0.581 0.131 0.169 0.308 0.1
0.533 0.208 0.210 95
0.489 0.362 0.401 0.182 0.375
0.413 0.539 0.618
0.194 0.313 0.740
0.740 0.863
0.863 0.597
0.597
51
0.054 0.1
0.130
0.606
0.999
0.00 0.50 0.70 0.90 1.00
2021.02.26_Heinz ABC-str atas-30.EDB Elevation View - 03.17 Steel P-M Interaction Ratios (AISC 360-10)
ETABS 18.1.1
0.576
0.576 0.580 0.580
0.452 0.452 0.482 0.499
0.522 0.537 0.441 0.499
0.461 0.483 0.404 0.489
0.382 0.411 0.342 0.455 0.3
0.281 0.318 0.254 94
0.152 0.200 0.138 0.306 0.1
0.217 0.120 0.222 95
0.409 0.302 0.415 0.177 0.369
0.621 0.506 0.635
0.853 0.853 0.733
0.733 0.881
0.881 0.589
0.589
0.767
0.7 0.221
0.753
0.030
0.125
29
0.585
0.982
0.932
0.085
0.099
0.085
0.099
0.0000
0.0417
0.0000
0.0417
2021.02.26_Heinz ABC-str atas-16.25.EDB Elevation View - 03.28 Shear Reinforcing (ACI 318-11)
ETABS 18.1.1
0.0000
0.0417
0.0000
0.0417
2021.02.26_Heinz ABC-str atas-16.25.EDB Elevation View - 03.29 Shear Reinforcing (ACI 318-11)
ETABS 18.1.1
0.509
0.136
0.473
0.160
0.130
0.522
0.00 0.50 0.70 0.90 1.00
2021.02.26_Heinz ABC-str atas-30.EDB Elevation View - 03.15 Column P-M-M Interaction Ratios (ACI 318-11)
ETABS 18.1.1
0.0417
0.0333
0.0583
0.0333
0.0583
2021.02.26_Heinz ABC-str atas-30.EDB Elevation View - 03.15 Shear Reinforcing (ACI 318-11)
ETABS 18.1.1
0.0583
0.0333
0.0583
0.0333
0.0583
2021.02.26_Heinz ABC-str atas-30.EDB Elevation View - 03.14 Shear Reinforcing (ACI 318-11)
ETABS 18.1.1
0.0417
0.0333
0.0583
0.0333
0.0583
2021.02.26_Heinz ABC-str atas-30.EDB Elevation View - 04.2 Shear Reinforcing (ACI 318-11)
ETABS 18.1.1
0.0417
0.0333
0.0583
0.0333
0.0583
2021.02.26_Heinz ABC-str atas-30.EDB Elevation View - 03.18 Shear Reinforcing (ACI 318-11)
Perhitungan Sambungan
Page 1 of 3
02/21/2021
01:22:57 AM
ASUS
Job: HEINZ BASE PLATE HB 300 -- Connection: HB300
Foundation: 1000 x 1000 x 1000 deep (reinf.) - 1-1/2" thick grout pad
HD Bolts: 12 x M24 8.8/N - hook length 200 - 500 embedment
Base plate:
600x450x50 Gr./Fy/Fu=A36/24/400MPa
Welds:
CJPGW/483MPa all around column.
Bolts:
12 x M24 8.8/N anchor bolts.
Bolt hole dia. . . . . . . . . . 46 mm
No. bolt rows = 4
No. bolt cols. = 4
Spacing of outer bolts, sg = 350 in XX direction.
Spacing of outer bolts, sp = 400 in YY direction.
Embedment length = 500, hook = 200
Shear capacity of bolts considered.
No shear key.
Foundation:
SHEAR ANALYSIS
NOTES:
1. Flexural yield capacity ignoring section slenderness.
10. Shear capacity reduced by 20% with grout pad - see AISC SDG 1 p.29.
1 warning.
Base plate:
500x350x32 Gr./Fy/Fu=A36/24/400MPa
Welds:
CJPGW/483MPa all around column.
Bolts:
8 x M20 A307/N anchor bolts.
Bolt hole dia. . . . . . . . . . 40 mm
No. bolt rows = 3
No. bolt cols. = 3
Spacing of outer bolts, sg = 300 in XX direction.
Spacing of outer bolts, sp = 400 in YY direction.
Embedment length = 500, hook = 200
Shear capacity of bolts considered.
No shear key.
Foundation:
Foundation strength, f'c . . . . 28.0 MPa
Grout thickness . . . . . . . . . 38 mm
Rectangular, D . . . . . . . . . 1000 mm
B . . . . . . . . . 1000 mm
Min. bolt edge distance . . . . . 300 mm
Depth . . . . . . . . . . . . . . 1000 mm
Coefficient of friction . . . . . 0.40
SHEAR ANALYSIS
NOTES:
1. Flexural yield capacity ignoring section slenderness.
10. Shear capacity reduced by 20% with grout pad - see AISC SDG 1 p.29.
Foundation: 1000 x 1000 x 1000 deep (reinf.) - 1-1/2" thick grout pad
HD Bolts: 10 x M24 8.8/S/N - hook length 200 - 500 embedment
Base plate:
600x450x50 Gr./Fy/Fu=A36/24/400MPa
Welds:
CJPGW/483MPa all around column.
Bolts:
10 x M24 8.8/S/N anchor bolts.
Bolt hole dia. . . . . . . . . . 46 mm
No. bolt rows = 4
No. bolt cols. = 3
Spacing of outer bolts, sg = 350 in XX direction.
Spacing of outer bolts, sp = 400 in YY direction.
Embedment length = 500, hook = 200
Shear capacity of bolts considered.
No shear key.
Foundation:
SHEAR ANALYSIS
NOTES:
1. Flexural yield capacity ignoring section slenderness.
10. Shear capacity reduced by 20% with grout pad - see AISC SDG 1 p.29.
56 Gr.A36
165WF300
100
B1
100 5.0 deg.
88
100
10
Gr.A36
Stiffeners: WF300
Top: 60x16x262 Gr.A36 - Weld=10 FW/483 Side=127
C1 End=full Plates: 50.8 kg
Web doubler both sides: 250x16x443 Gr.A36 CJPGW all around Bolts: 2.8 kg
Btm.: 60x16x282 Gr.A36 - Weld=10 FW/483 Side=full End=full Welds: 7.0 kg
Haunched section:
Depth at end plate . . . . . . . 500 mm
Horizontal length . . . . . . . . 600 mm
Haunch angle . . . . . . . . . . 21.94˚
Effective section depth . . . . . 498 mm
Effective section area . . . . . 7473 mm2
Section plastic modulus . . . . . 1108653 mm3
Section Ixx . . . . . . . . . . . 2.3726E+08 mm4
Section moment strength . . . . . 247.7 kN.m Note 1
Section shear strength . . . . . 410.2 kN Note 2
Section tension strength . . . . 1669.3 kN
End plate:
550x150x20 Gr./Fy/Fu=A36/24/400MPa
Beam to end plate angle . . . . . 85.00˚
Haunch to end plate angle . . . . 68.06˚
Bolts:
6 x M16 A325PT/N top flange, 100 gauge.
4 x M16 A325PT/N btm. flange, 100 gauge.
BILL OF MATERIALS
Plates:
1 no. - 550x150x20 Grade=A36 . . . . . . . 13.0 kg
2 no. - 140x42x20 Grade=A36 . . . . . . . . 1.8 kg
2 no. - 282x60x16 Grade=A36 . . . . . . . . 4.3 kg
2 no. - 443x250x16 Grade=A36 . . . . . . . 27.8 kg
2 no. - 262x60x16 Grade=A36 . . . . . . . . 3.9 kg
Total mass of plates . . . . . . . . . . . 50.8 kg
Bolts:
10 no. - M16 A325PT/N x 80 long . . . . . . 2.8 kg
Welds:
448 mm - FW 8 fu=483MPa . . . . . . . . . . 0.1 kg
280 mm - CJPGW 20x20x85% fu=483MPa . . . . 0.7 kg
300 mm - CJPGW 9x9x50% fu=483MPa . . . . . 0.1 kg
2680 mm - FW 10 fu=483MPa . . . . . . . . . 1.1 kg
1772 mm - CJPGW 16x16x85% fu=483MPa . . . . 3.0 kg
1000 mm - CJPGW 16x16x100% fu=483MPa . . . 2.0 kg
Total mass of welds . . . . . . . . . . . . 7.0 kg
BOLT ARRANGEMENT
6-Bolt Flush End Plate
Connection checked for tension at top flange.
GEOMETRY CHECKS
CHECK 1 - Detailing Requirements:
Bolt UTS . . . . . . . . . . . . 827 ≥ 800 Yes
End plate width, bi . . . . . . . 150 ≥ 163 No
150 ≤ 175 Yes
NOTE: Clearances should be checked in virtual reality view.
End plate bolt bearing strength, øRn . . . 921.4 ≥ Vb = 42.8 21.5 Pass SDG4 (3.18)
COLUMN-SIDE CHECKS...
Ref. 19: Steel Design Guide 4 (SDG4)
Extended End Plate Moment Connections - Seismic and Wind Applications
T.M. Murray & E.A. Sumner - AISC - 2004
┌QQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQR
S WARNING: This connection does not satisfy all requirements of the model. S
S Even if stated capacity is adequate the design may not be valid. S
YQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQZ
NOTES:
1. Flexural yield capacity ignoring section slenderness.
2. Shear yield capacity ignoring slenderness.
4. Compression yield capacity of section ignoring slenderness.
56 Gr.A36
100 216WF400
100 B1
100 5.0 deg.
88
100
100
Gr.A36
HB300 10
Stiffeners: C1
Top: 60x16x250 Gr.A36 - Weld=10 FW/483 Side=127 End=full Plates: 80.5 kg
Web doubler both sides: 238x16x639 Gr.A36 CJPGW all around Bolts: 7.6 kg
Btm.: 60x16x270 Gr.A36 - Weld=10 FW/483 Side=full End=full Welds: 8.6 kg
Haunched section:
Depth at end plate . . . . . . . 700 mm
Horizontal length . . . . . . . . 600 mm
Haunch angle . . . . . . . . . . 29.25˚
Effective section depth . . . . . 697 mm
Effective section area . . . . . 1.3427E+04 mm2
Section plastic modulus . . . . . 2784951 mm3
Section Ixx . . . . . . . . . . . 8.4126E+08 mm4
Section moment strength . . . . . 622.1 kN.m Note 1
Section shear strength . . . . . 622.0 kN Note 2
Section tension strength . . . . 2999.5 kN
End plate:
750x200x25 Gr./Fy/Fu=A36/24/400MPa
Beam to end plate angle . . . . . 85.00˚
Haunch to end plate angle . . . . 60.75˚
Bolts:
8 x M20 A325PT/N top flange, 100 gauge.
6 x M20 A325PT/N btm. flange, 100 gauge.
BILL OF MATERIALS
Plates:
1 no. - 750x200x25 Grade=A36 . . . . . . . 29.4 kg
2 no. - 140x115x20 Grade=A36 . . . . . . . 5.1 kg
2 no. - 270x60x16 Grade=A36 . . . . . . . . 4.1 kg
2 no. - 639x238x16 Grade=A36 . . . . . . . 38.2 kg
2 no. - 250x60x16 Grade=A36 . . . . . . . . 3.8 kg
Total mass of plates . . . . . . . . . . . 80.5 kg
Bolts:
14 no. - M20 A325PT/N x 100 long . . . . . 7.6 kg
Welds:
740 mm - FW 8 fu=483MPa . . . . . . . . . . 0.2 kg
280 mm - CJPGW 20x20x85% fu=483MPa . . . . 0.7 kg
400 mm - CJPGW 13x13x50% fu=483MPa . . . . 0.3 kg
2816 mm - FW 10 fu=483MPa . . . . . . . . . 1.1 kg
2556 mm - CJPGW 16x16x85% fu=483MPa . . . . 4.4 kg
952 mm - CJPGW 16x16x100% fu=483MPa . . . . 1.9 kg
Total mass of welds . . . . . . . . . . . . 8.6 kg
BOLT ARRANGEMENT
8-Bolt Flush End Plate
Connection checked for tension at top flange.
GEOMETRY CHECKS
CHECK 1 - Detailing Requirements:
Bolt UTS . . . . . . . . . . . . 827 ≥ 800 Yes
End plate width, bi . . . . . . . 200 ≥ 213 No
200 ≤ 325 Yes
NOTE: Clearances should be checked in virtual reality view.
End plate bolt bearing strength, øRn . . . 2159.4 ≥ Vb = 73.7 29.3 Pass SDG4 (3.18)
COLUMN-SIDE CHECKS...
Ref. 19: Steel Design Guide 4 (SDG4)
Extended End Plate Moment Connections - Seismic and Wind Applications
T.M. Murray & E.A. Sumner - AISC - 2004
┌PPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPQ
R WARNING: This connection does not satisfy all requirements of the model. R
R Even if stated capacity is adequate the design may not be valid. R
YPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPZ
NOTES:
1. Flexural yield capacity ignoring section slenderness.
2. Shear yield capacity ignoring slenderness.
4. Compression yield capacity of section ignoring slenderness.
94
140 350Gr.A36
140 WF700
140 B1
112
140
140
Gr.A36
HB400 10
C1
Stiffeners:
Top: 100x32x338 Gr.A36 - Weld=10 FW/483 Side=127 End=full Plates: 296.7 kg
Web doubler both sides: 294x32x880 Gr.A36 CJPGW all around Bolts: 13.6 kg
Btm.: 100x32x358 Gr.A36 - Weld=10 FW/483 Side=full End=full Welds: 37.8 kg
Haunched section:
Depth at end plate . . . . . . . 1000 mm
Horizontal length . . . . . . . . 700 mm
Haunch angle . . . . . . . . . . 21.39˚
Effective section depth . . . . . 1000 mm
Effective section area . . . . . 3.4024E+04 mm2
Section plastic modulus . . . . . 1.0568E+07 mm3
Section Ixx . . . . . . . . . . . 4.6147E+09 mm4
Section moment strength . . . . . 2360.8 kN.m Note 1
Section shear strength . . . . . 1661.1 kN Note 2
Section tension strength . . . . 7600.7 kN
Rafter vertical eccentricity . . 150.0 mm
End plate:
1300x300x40 Gr./Fy/Fu=A36/24/400MPa
Beam to end plate angle . . . . . 90.00˚
Haunch to end plate angle . . . . 68.61˚
Bolts:
8 x M24 A325PT/N top flange, 100 gauge.
6 x M24 A325PT/N btm. flange, 100 gauge.
BILL OF MATERIALS
Plates:
1 no. - 1300x300x40 Grade=A36 . . . . . . . 122.5 kg
2 no. - 180x164x20 Grade=A36 . . . . . . . 9.3 kg
2 no. - 358x100x32 Grade=A36 . . . . . . . 18.0 kg
2 no. - 880x294x32 Grade=A36 . . . . . . . 130.0 kg
2 no. - 338x100x32 Grade=A36 . . . . . . . 17.0 kg
Total mass of plates . . . . . . . . . . . 296.7 kg
Bolts:
14 no. - M24 A325PT/N x 130 long . . . . . 13.6 kg
Welds:
1016 mm - FW 8 fu=483MPa . . . . . . . . . 0.3 kg
360 mm - CJPGW 20x20x85% fu=483MPa . . . . 1.0 kg
600 mm - CJPGW 24x24x50% fu=483MPa . . . . 1.4 kg
4364 mm - FW 10 fu=483MPa . . . . . . . . . 1.7 kg
3520 mm - CJPGW 32x32x85% fu=483MPa . . . . 24.1 kg
1176 mm - CJPGW 32x32x100% fu=483MPa . . . 9.5 kg
Total mass of welds . . . . . . . . . . . . 37.8 kg
Simplified analysis:
Beam 1... Puft = 210.0t Pufc = 210.0c
Puwt = 0.0 Puwc = 0.0
Muw = 0.00
Vuw = 74.0
Elastic analysis:
Beam 1... Puft = 167.5t Pufc = 167.5c
Puwt = 0.0 Puwc = 0.0
Muw = 41.5
Vuw = 74.0
Plastic analysis:
Beam 1... Puft = 163.2t Pufc = 163.2c
Puwt = 0.0 Puwc = 0.0
Muw = 45.7
Vuw = 74.0
BOLT ARRANGEMENT
8-Bolt Flush End Plate
Connection checked for tension at top flange.
GEOMETRY CHECKS
CHECK 1 - Detailing Requirements:
Bolt UTS . . . . . . . . . . . . 827 ≥ 800 Yes
End plate width, bi . . . . . . . 300 ≥ 313 No
300 ≤ 425 Yes
NOTE: Clearances should be checked in virtual reality view.
COLUMN-SIDE CHECKS...
Ref. 19: Steel Design Guide 4 (SDG4)
Extended End Plate Moment Connections - Seismic and Wind Applications
T.M. Murray & E.A. Sumner - AISC - 2004
┌PPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPQ
R WARNING: This connection does not satisfy all requirements of the model. R
R Even if stated capacity is adequate the design may not be valid. R
XPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPY
NOTES:
1. Flexural yield capacity ignoring section slenderness.
2. Shear yield capacity ignoring slenderness.
4. Compression yield capacity of section ignoring slenderness.
INPUT DATA qU
2
q.DL = 24 kg/m weight of roof
2
q.WL = 40 kg/m wind load Lk
2
q.LL = 20 kg/m wind load
PLL = 100 kg Live load
x
a = 10 slope angle
Lk = 6000 mm purlin supported
Lp = 1200 mm horizontal distance of purlin
Lx = 2000 mm tie rod distance a
2
fy = 2400 kg/cm yield strength of steel
y
E = 2,100,000 kg/cm2 modulus of elasticity of steel
CALCULATION
Try C 150x65x20x2.3
4 3
Ix = 248.00 cm Zx = 33.00 cm
4 3
Iy = 41.00 cm Zy = 9.37 cm
q = 5.50 kg/m
Deflection Check
dx = 17.70 mm
Pu = Qp + Qs = ( qp x Ap ) + S (qs x As)
Pu = ( 25 x Np x Ap ) + S ( Ns x Ls + Nc x Lc ) x K (Japanese Formula)
5 2
P allowable = Qs / 5 (Tension)
Mini Pile 25 x 25 cm
∑ = 70.50
K = 4 x 0.25 = 1.00 m
-2.00
-3.00
-4.00
-5.00
meter
-6.00
-7.00
-8.00
-9.00
-10.00
-11.00
-12.00
-13.00
0 5 10 15 20 25 30 35 40
ton
Series1
ETABS 18.1.1
03.32 03.32
158 160
Fz = 4 Fz = 5
03.31 03.31
161 162
Fz = 5 Fz = 5
03.30 03.30
163 164
Fz = 5 Fz = 5
03.29 03.29
165 171
Fz = 5 Fz = 5
03.28 03.28
172 173
Fz = 5 Fz = 5
03.27 03.27
174 175
Fz = 5 Fz = 5
03.26 03.26
176 177
Fz = 5 Fz = 6
03.25 03.25
178 179
Fz = 5 Fz = 6
03.24 03.24
180 181
Fz = 5 Fz = 6
03.23 03.23
182 184
Fz = 5 Fz = 6
03.22 03.22
186 199
Fz = 5 Fz = 6
03.21 03.21
200 201
Fz = 5 Fz = 6
03.20 03.20
204 206
Fz = 5 Fz = 6
03.19 03.19
208 210
Fz = 5 Fz = 6
03.18
437 435 436214 216
Fz = 15 Fz = 15 Fz Fz
= 9= 4 Fz = 5
03.17 03.17
433 434218 220
Fz = 16 Fz Fz
= 9= 4 Fz = 4
04.2 04.2
427 425 426227 228
Fz = 16 Fz = 16 Fz Fz
= 9= 4 Fz = 5
03.16 03.16
442 441224 226
Fz = 16 Fz =Fz10= 4 Fz = 5
03.15 03.15
439 440 438
Fz = 18 Fz = 15 Fz = 8
03.14 03.14
444 446 443
Fz = 9 Fz = 15 Fz = 8
03.13 03.13
461 462 448
Fz = 10 Fz = 15 Fz = 8
03.12 03.12
465 466 463
Fz = 10 Fz = 15 Fz = 8
03.11 03.11
1154 1155 1167
Fz = 9 Fz = 14 Fz = 8
03.10 03.10
03.9 03.9
03.8 03.8
03.7 03.7
PERHITUNGAN JUMLAH TIANG PANCANG
DIA. 25 x 25 cm
P2 P1 P2
03.32 03.32
P2 P2
03.31 03.31
P2 P2
03.30 03.30
P2 P2
03.29 03.29
03.28 P2 P2 03.28
03.27 P2 P2 03.27
03.26 P2 P2 03.26
03.25 P2 P2 03.25
P2 P2
03.24 03.24
03.23 P2 P2 03.23
P2 P2
03.22 03.22
03.21
P2 P2 03.21
KETERANGAN PILE
03.20 P2 P2 03.20
P1 1 PILE
03.19 P2 P2 03.19
EX EX P2
P2 2 PILE
03.18 P3 P2
P2 EX EX
Pijin 35 Ton
03.14 03.14
03.13 P2 EX EX 03.13
03.12 P2 EX EX 03.12
03.11 03.11
03.10 03.10
XII.PENULANGAN STRUKTUR BAWAH
XII.1 Penulangan Pile Cap
PERENCANAAN PILE CAP BERDASARKAN DAYA DUKUNG IJIN TIANG PANCANG
l
a1
b1 X
2-2 b
1-1
Potongan 1-1 (Melintang) = 1 Tiang
Jumlah Tiang = 1.0
V = 25.0 Ton
Vu = P x 1.5
Vu = Ø Vn ; Ø = 0.75
= Ø ( Vc + Vs )
Vu = 37.5 Ton
Vn = Vu / 0.75 Ton
Vn = 50.0 Ton
= 500,000.0 N
Vn = Vc + Vs
Vs = Vn - Vc
= 411,458.3 N
Vs < 2/3 x f'c(1/2) x b x d'
354,166.7 N
Vs = Av fy ( d' /s ) N
= 411,458.3 N
Tulangan Geser
Dia. Tulangan = 16.0 mm
Av = 2 x ( 1/4 x 3.14 x dia² )
Av = 401.9 mm²
s = Av x fy x d' / Vs mm
= 200.0 mm
Digunakan Tul geser : D16-200
PERENCANAAN PILE CAP BERDASARKAN DAYA DUKUNG IJIN TIANG PANCANG
a1
X
b b1
3D
1-1
Potongan 1-1 (Melintang) = 1 Tiang panjang kolom h = 700.0 mm
Jumlah Tiang = 1.0 lebar kolom b = 400.0 mm
M1-1 = P x ex f'c = 25.0 Mpa
= 0.88 Ton-m d eff = 525.0 mm
= 8,750,000.0 Nmm jarak tepi = 250.0 mm
Mu = M1-1 x 1.5 = 13,125,000.0 Nmm Pu = 700.0 KN
Mn = Mu / 0.8
= 16,406,250.0 Nmm
b = 0.600 m
f'c = 25 Mpa
V = 35.0 Ton
Vu = P x 1.5
Vu = Ø Vn ; Ø = 0.75
= Ø ( Vc + Vs )
PERENCANAAN PILE CAP ( TYPE-P2 )
Vu = 52.5 Ton
Vn = Vu / 0.75 Ton
Vn = 70.0 Ton
= 700,000.0 N
Vn = Vc + Vs
Vs = Vn - Vc
= 437,500.0 N
Vs < 2/3 x f'c(1/2) x b x d'
1,050,000.0 N OK !
Vs = Av fy ( d' /s ) N
= 437,500.0 N
Tulangan Geser
Dia. Tulangan = 13.0 mm
Av = 2 x ( 1/4 x 3.14 x dia² )
Av = 265.3 mm²
s = Av x fy x d' / Vs mm
= 150.0 mm
Digunakan Tul geser : D13-150
Tulangan Lentur
Coba tebal penampang
d = 600.0 mm
d' = 525.0 mm
Mn = 16,406,250.0
Rn = Mn / ( b d'² )
= 0.1
m = fy / 0.85 f'c )
= 32.0
The picture can't be display ed.
1 2.Rn.m
rho = 1 1
m fy
rho = 0.00025
As perlu = rho x b x d'
As perlu = 78.4 mm²
d
2
J d b 3
b mm
4
=1 1 3 2
416,892,382,813
6 b b
1 1
b1 X
D
b
a1
ex
3D
1-1
l
Potongan 1-1 (Melintang) = 1 Tiang
Jumlah Tiang = 1.0
M1-1 = P x ex
= 0.9 Ton-m
= 8,750,000.0 Nmm
Mu = M1-1 x 1.5 = 13,125,000.0 Nmm
Mn = Mu / 0.8
= 16,406,250.0 Nmm
b = 1.000 m
f'c = 24.9 Mpa
V = 35.0 Ton
Vu = P x 1.5
Vu = Ø Vn ; Ø = 0.75
= Ø ( Vc + Vs )
Page 3 of 3
Vu = 52.5 Ton
Vn = Vu / 0.75 Ton
Vn = 70.0 Ton
= 700,000.0 N
Vn = Vc + Vs
Vs = Vn - Vc
= 263,375.9 N
(1/2)
Vs < 2/3 x f'c x b x d'
1,746,496.5 N OK !
Vs = Av fy ( d' /s ) N
= 263,375.9 N
Tulangan Geser
Dia. Tulangan = 13.0 mm
Av = 2 x ( 1/4 x 3.14 x dia² )
Av = 265.3 mm²
s = Av x fy x d' / Vs mm
= 250.0 mm
Tulangan Lentur
Coba tebal penampang
d = 600.0 mm
d' = 525.0 mm
Mn = 16,406,250.0
Rn = Mn / ( b d'² )
= 0.1
m = fy / 0.85 f'c )
= 32.1
rho =
rho = 0.00015
As perlu = rho x b x d'
As perlu = 78.3 mm²
2
d b 3
b 4
J =1 1 d 3 2 446,435,937,500 mm
6 b
1 b1
B24 B24
03.32 03.32
B24
B24
03.31 03.31
B24
B24
03.30 03.30
B24
B24
03.29 03.29
B24
B24
03.28 03.28
B24
B24
03.27 03.27
B24
B24
03.26 03.26
B24
B24
03.25 03.25
B24
B24
03.24 03.24
B24
B24
03.23 03.23
B24
B24
03.22 03.22
B24
B24
03.21 03.21
B24
B24
03.20 03.20
B24
B24
03.19 03.19
B24
B24
03.18
B24 B24
B24 B24
B24 B24
B24
B24
03.17 03.17
B24
B24
04.2 04.2
B24
B24
B24
B24
B24
B24 B24
03.16 03.16
B24
03.15 03.15
B24
03.14 03.14
B24
03.13 03.13
B24
B24
B24
03.12 03.12
03.11 03.11
03.9
04.2
03.10
03.11
03.12
03.13
03.14
03.15
03.16
03.17
03.18
03.19
03.20
03.21
03.22
03.23
03.24
03.25
03.26
03.27
03.28
03.29
03.30
03.31
03.32
1.31 0.67 2.48 0.89 1.70 2.98 1.56 0.56 1.17 3.94 2.48 1.90 2.27 2.48 4.03 1.63 1.63 1.63 2.25 3.35 4.89
03.A
2.48 1.94 1.27 1.92 0.88 1.86 1.37 2.48 3.16 2.48 1.90 1.90 2.27 2.27 2.48 3.48 2.80 1.62 2.25 2.25 2.70
0.22 0.22 0.26 0.27 0.25 0.29 0.29 0.29 0.33 0.31 0.32 0.38 0.49 0.37 0.23 0.57 0.46 0.53 0.30 0.26 0.25
0.56 0.12 0.60 0.67 0.22 0.69 0.78 0.36 0.84 0.79 0.70 1.49 6.63 2.02 1.04 1.53 2.97 8.88 1.92 0.95 0.83
1.03 0.21 1.06 0.91 0.21 0.90 0.92 0.21 0.82 0.87 0.20 0.80 0.84 0.19 0.84 0.86 0.19 0.84 0.85 0.19 0.84 0.86 0.19 0.85 0.85 0.19 0.85 0.85 0.19 0.86 0.85 0.19 0.86 0.85 0.19 0.86 0.85 0.20 0.87 0.84 0.20 0.87 0.85 0.20 0.86 0.80 0.21 0.89 1.00 0.22 0.84
03.C
0.26 0.26 0.28 0.37 0.35 0.37 0.49 0.48 0.52 0.69 0.69 0.96 2.48 3.02 6.11 6.62 2.50 3.23 1.20 0.88 0.89
03.C'
0.64 0.76 0.46 0.44 0.21 0.41 0.44 0.26 0.37 0.42 0.29 0.36 0.40 0.27 0.39 0.41 0.27 0.39 0.41 0.27 0.39 0.41 0.27 0.40 0.41 0.27 0.40 0.41 0.27 0.41 0.41 0.27 0.41 0.40 0.27 0.42 0.40 0.28 0.42 0.40 0.28 0.42 0.40 0.28 0.42 0.38 0.29 0.43 0.47 0.63 0.65
0.25 0.48 0.49
0.30 0.22 1.06
1.21 0.29 1.46 1.34 0.38 0.88 0.98 0.24 1.00 1.04 0.25 0.99 1.03 0.25 1.00 1.03 0.24 1.00 1.03 0.24 1.01 1.03 0.24 1.02 1.02 0.23 1.02 1.02 0.24 1.03 1.02 0.24 1.03 1.00 0.25 1.05 1.01 0.25 1.04 1.00 0.26 1.05 1.01 0.26 1.05 0.94 0.26 1.03 1.21 0.45 1.24
0.85 0.88 0.66 0.67 0.36 0.42 0.48 0.37 0.46 0.51 0.36 0.46 0.51 0.35 0.47 0.50 0.35 0.47 0.50 0.35 0.48 0.50 0.34 0.48 0.49 0.34 0.49 0.49 0.34 0.50 0.48 0.35 0.50 0.48 0.36 0.51 0.48 0.35 0.51 0.47 0.36 0.52 0.47 0.37 0.52 0.44 0.38 0.51 0.56 0.81 0.97
03.D'03.D
03.E
03.9
04.2
03.10
03.11
03.12
03.13
03.14
03.15
03.16
03.17
03.19
03.20
03.21
03.22
03.23
03.24
03.25
03.26
03.27
03.28
03.29
03.30
03.31
03.32
ETABS 18.1.1
03.9
04.2
03.10
03.11
03.12
03.13
03.14
03.15
03.16
03.17
03.18
03.19
03.20
03.21
03.22
03.23
03.24
03.25
03.26
03.27
03.28
03.29
03.30
03.31
03.32
0.0193 0.0172 0.0193 0.0190 0.0172 0.0190 0.0192 0.0172 0.0192 0.0190 0.0172 0.0190 0.0208 0.0177 0.0208 0.0205 0.0183 0.0205 0.0219 0.0196 0.0219
03.A
0.0000 0.0000 0.0000 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172
0.0324 0.0292 0.0324 0.0469 0.0445 0.0469 0.0172 0.0172 0.0172
0.0000 0.0000 0.0000 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172
03.C
03.C'
0.0172
0.0000
0.0172
0.0000
0.0172
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172
03.D'03.D
03.E
03.9
04.2
03.10
03.11
03.12
03.13
03.14
03.15
03.16
03.17
03.19
03.20
03.21
03.22
03.23
03.24
03.25
03.26
03.27
03.28
03.29
03.30
03.31
03.32
ETABS 18.1.1
0.19 0.86 0.85 0.19 0.86 0.85 0.20 0.87 0.84 0.20 0.87 0.85 0.20 0.86 0.80 0.21 0.89 1.00 0.22 0.84
0.27 0.41 0.40 0.27 0.42 0.40 0.28 0.42 0.40 0.28 0.42 0.40 0.28 0.42 0.38 0.29 0.43 0.47 0.63 0.65
03.C'
0.24 1.03 1.00 0.25 1.05 1.01 0.25 1.04 1.00 0.26 1.05 1.01 0.26 1.05 0.94 0.26 1.03 1.21 0.45 1.24
0.35 0.50 0.48 0.36 0.51 0.48 0.35 0.51 0.47 0.36 0.52 0.47 0.37 0.52 0.44 0.38 0.51 0.56 0.81 0.97
03.D'03.D
04.2
03.12
03.13
03.14
03.15
03.16
03.17
03.18
03.19
2.48 1.94 1.27 1.92 0.88 1.86 1.37 2.48 3.16 2.48 1.90 1.90 2.27 2.27 2.48 3.48 2.80 1.62 2.25 2.25 2.70
0.50 0.09 0.60 0.57 0.13 0.62 0.59 0.17 0.66 0.60 0.21 0.73 1.17 0.16 0.49 0.22 0.18 1.25 0.65 0.13 0.54
0.22 0.22 0.26 0.27 0.25 0.29 0.29 0.29 0.33 0.31 0.32 0.38 0.49 0.37 0.23 0.57 0.46 0.53 0.30 0.26 0.25
03.11
03.12
03.13
03.14
03.15
03.16
03.17
03.18
03.19
ETABS 18.1.1
0.0193 0.0172 0.0193 0.0190 0.0172 0.0190 0.0192 0.0172 0.0192 0.0190 0.0172 0.0190 0.0208 0.0177 0.0208 0.0205 0.0183 0.0205 0.0219 0.0196 0.0219
0.0000 0.0000 0.0000 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0324 0.0292 0.0324 0.0469 0.0445 0.0469 0.0172 0.0172 0.0172
0.0000 0.0000 0.0000 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172
0.0172
0.0172
0.0172
ETABS 18.1.1 2/28/2021
0.0172
0.0172
0.0172
0.0172
0.0172
0.0172
0.0172
0.0172
0.0172
0.0172
0.0172
2021.02.19_Heinz ABC-str bawah.EDB Plan View - +0.00 - Z = 0 (cm) Shear Reinforcing (ACI 318-11)
LAMPIRAN