Keterangan

Ruangan yang sudah dikerjakan


Ruangan Makan Ruangan Sepatu Ruangan Sepatu R. Pantry R. Panel
Ruangan Simulator 1 Musholla Musholla Toilet R. Mitra Kerja
Ruangan Simulator 2 Ruang Infrastruktur Ruang Infrastruktur R. Assesment R. Kerja
Ruangan Meeting Ruang PM/GA Ruang PM/GA R. Induksi

-0.40 -0.02
4
MINE KASIR R.FOTOCOPY
±0.00 ±0.00 ±0.00
R.KERJA
±0.00 R.INDUKSI R.INDUKSI R.INDUKSI
±0.00 ±0.00 ±0.00 PEMBANGUNAN GEDUNG PERKANTORAN SIMPANG WARA
TOILET TOILET TAMAN TAMAN PT. ADARO PERSADA MANDIRI - JL. HAULING ROAD ADARO INDONESIA KM 67,
STORAGE FILLING DESA BAJUT, KECAMATAN TANTA,
-0.02 -0.02 -0.15 -0.15
±0.00 KABUPATEN TABALONG - PROVINSI KALIMANTAN SELATAN
3'
R.INDUKSI
SELASAR SELASAR ±0.00
±0.00 ±0.00
3
TAMAN TAMAN
-0.15 -0.15 PT. IRAWAN PRIMA UTAMA
R.INDUKSI R.INDUKSI R.INDUKSI R.INDUKSI
MAKET ±0.00 ±0.00 ±0.00
1 MRRD
SERVER
±0.00
±0.00

R.MAKAN R.TEATER R.MITRA KERJA


±0.00 ±0.00 20/08/2020
±0.00

MAKET PANEL 20/08/2020


MRRD ±0.00

2
R.PERSIAPAN CATERING SELASAR R.TUNGGU SELASAR
±0.00 ±0.00 ±0.00 ±0.00
1' TAMAN TAMAN
-0.15 -0.15
TOILET TOILET
-0.02 -0.02 R.ASSESSEMENT
R.SIMULATOR R.SIMULATOR R.MEETING PANTRY MUSHOLA R.INSTRUKTUR R.FM/GA ±0.00
RUANG SEPATU &
±0.00 ±0.00 ±0.00 -0.02 +0.02 ±0.00 ±0.00
OB
2 3 4 5 ±0.00
6 7 8
1
-0.02 -0.40 -0.02

A B C D E F G H I J

DENAH HSEEC 1
MP-000 ALL
1:200

0 250 500 750 1250 CM

U
GEDUNG INDUKSI 1:250
DENAH

APM-IPU-ADARO-PSW
PSW-IND-IPU-A-001 -
AS BUILT DRAWING