KOP PERUSAHAAN

REKAPITULASI
DAFTAR KUANTITAS DAN HARGA
PEKERJAAN : PEMBANGUNAN RUMAH SUSUN TYPE BARAK PANJANG
JUMLAH LANTAI : 2 LANTAI
LOKASI : PONPES AL HUDA
DESA BANYU URIP, KECAMATAN SAMBUNG MACAN, KABUPATEN SRAGEN
TAHUN ANGGARAN : 2021

JUMLAH HARGA
No. JENIS PEKERJAAN
( Rp. )

I. PEKERJAAN PERSIAPAN DAN PEKERJAAN RK3K KONSTRUKSI TOTAL I :

PEKERJAAN PERSIAPAN

PEKERJAAN RK3K KONSTRUKSI

II. PEKERJAAN STRUKTUR, ARSITEKTUR DAN ME TOTAL II :

II.A. PEKERJAAN STANDART SUB TOTAL II.A :

PEKERJAAN STRUKTUR STANDART

PEKERJAAN ARSITEKTUR STANDART

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDAR

II.B. PEKERJAAN NON STANDART SUB TOTAL II.B :

PEKERJAAN STRUKTUR NON STANDART

PEKERJAAN ARSITEKTUR NON STANDART

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

TOTAL I + II :

PPN 10 % :

TOTAL

Terbilang :

......................., .................... 2021

PT / CV / KSO. ........................

.........................................
DIREKTUR
REKAPITULASI
DAFTAR KUANTITAS DAN HARGA

PEKERJAAN : PEMBANGUNAN RUMAH SUSUN TYPE BARAK PANJANG


JUMLAH LANTAI : 2 LANTAI
LOKASI : PONPES AL HUDA
DESA BANYU URIP, KECAMATAN SAMBUNG MACAN, KABUPATEN SRAGEN
TAHUN ANGGARAN : 2021

I. PEKERJAAN PERSIAPAN STANDAR DAN PEKERJAAN RK3K KONSTRUKSI


JUMLAH HARGA
No. URAIAN PEKERJAAN
(Rp.)

I.A. PEKERJAAN PERSIAPAN

I.B. PEKERJAAN RK3K KONSTRUKSI

JUMLAH HARGA PEKERJAAN PERSIAPAN DAN RK3K KONSTRUKSI


DAFTAR KUANTITAS DAN HARGA

PEKERJAAN : PEMBANGUNAN RUMAH SUSUN TYPE BARAK PANJANG


JUMLAH LANTAI : 2 LANTAI
LOKASI : PONPES AL HUDA
DESA BANYU URIP, KECAMATAN SAMBUNG MACAN, KABUPATEN SRAGEN
TAHUN ANGGARAN : 2021

I. PEKERJAAN PERSIAPAN STANDAR


HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOL. SAT.
( Rp. ) ( Rp. )

I.A. PEKERJAAN PERSIAPAN

1 Pengukuran dan Pemasangan Bouwplank 192.00 M'


2 Direksi Keet 24.00 M2
3 Papan Nama Proyek 1.00 ls
4 Foto Proyek 3.00 Phase
5 Air Kerja 1.00 Ls
6 Listrik Kerja 1.00 Ls
7 Pagar Seng Keliling Proyek 192.00 M'
DAFTAR KUANTITAS DAN HARGA

PEKERJAAN : PEMBANGUNAN RUMAH SUSUN TYPE BARAK PANJANG


JUMLAH LANTAI : 2 LANTAI
LOKASI : PONPES AL HUDA
DESA BANYU URIP, KECAMATAN SAMBUNG MACAN, KABUPATEN SRAGEN
TAHUN ANGGARAN : 2021

I. PEKERJAAN RK3K KONSTRUKSI


WAKT HARGA SATUAN JUMLAH HARGA
NO. JENIS PEKERJAAN VOL. SAT.
U (Rp.) (Rp.)

I.B. PEKERJAAN RK3K KONSTRUKSI TOTAL


1 Penyiapan RK3K terdiri atas: LS 1.00
Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja
Pembuatan Kartu Identitas Pekerja (KIP);

2 Sosialisasi dan Promosi K3 terdiri atas:


a Induksi K3 (Safety Induc on ); khusus untukpekerja baru Org 80.00 1
b Pengarahan K3 (safety briefing) : Pertemuan Keselamatan (Safety Talk dan/atau Org 80.00 1
Tool Box Meeting) ; setiap hari
Pelatihan K3;
- Bekerja di Ketinggian
- K3 Peralatan Konstruksi & Penggunaan bahan Kimia (MSDS)
- Analysis Keselamatan Pekerjaan
- Perilaku Berbasis Keselamatan (Budaya K3)
- P3K
c Simulasi K3; Org 20.00 1
d Spanduk (banner) ; Lb 5.00 1
e Poster; Lb 3.00 1
f Papan Informasi K3. Bh 1.00 1

3 Alat Pelindung Kerja terdiri atas:


a Jaring Pengaman(Polynet/Safety Net);
b Tali Keselamatan (Life Line); Ls 2.00 1
c Penahan Jatuh (Safety Deck); Ls 1.00 1
d Pagar Pengaman (Guard Railling); Ls 1.00 1
e Pembatas Area (Restricted Area ). Ls 1.00 1

4 Alat Pelindung Diri terdiri atas:


a Topi Pelindung (Safety Helmet) ; Bh 80.00 1
b Pelindung Mata (Goggles, Spectacles); Psg 24.00 1
c Tameng Muka (Face Shield); Bh 21.00 1
d Pelindung Telinga (Ear Plug, Ear Muff); Psg 24.00 1
e Pelindung Pernafasan Dan Mulut (Masker); Bh 80.00 1
f Sarung Tangan (Safety Gloves); Psg 24.00 1
g Sepatu Keselamatan (Safety Shoes); untuk Staf Psg 24.00 1
h Sepatu Keselamatan (Rubber Safety Shoes and toe cap) Psg 80.00 1
h Penunjang Seluruh Tubuh (Full Body Harness); Bh 7.00 1
i Jaket Pelampung (Life Vest);
j Rompi Keselamatan (Safety Vest); Bh 80.00 1
k Celemek (Apron/Coveralls); Bh
l Pelindung Jatuh (Fall Arrester); Bh 7.00 1

5 Personil K3 terdiri atas :


a Ahli K3 bln 1.00 5
b Petugas K3 bln 1.00 5
c Petugas P3K; bln 1.00 5

6 P3K
a Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, dll) Ls 1.00 1
b Ruang P3K (Tempat Tidur Pasien, Stetoskop, Timbangan Berat Badan, Tensi Meter, dll);
Ls 1.00 1
7 Rambu- Rambu terdiri atas : ls 1.00 1
Rambu Petunjuk;
Rambu Larangan;
Rambu Peringatan;
Rambu Kewajiban;
Rambu Informasi;
Rambu Pekerjaan Sementara;
Tongkat Pengatur Lalu Lintas (Warning Lights Stick) ;
Kerucut Lalu Lintas (Traffic Cone) ;
Lampu Putar (Rotary Lamp );
Lampu Selang Lalu Lintas.

8 Lain- Lain Terkait Pengendalian Risiko K3


a Alat Pemadam Api Ringan (APAR); 10Kg Bh 2.00 1
b Sirine; Bh 4.00 1
c Bendera K3; Bh 2.00 1
d Jalur Evakuasi (Escape Route ); Ls 1.00 1
e Lampu Darurat (Emergency Lamp ); Bh 2.00 1
f Program Inspeksi Dan Audit Internal; Org 2.00 1
g Pelaporan dan Penyelidikan Insiden. Ls 1.00 1
REKAPITULASI
DAFTAR KUANTITAS DAN HARGA

PEKERJAAN : PEMBANGUNAN RUMAH SUSUN TYPE BARAK PANJANG


JUMLAH LANTAI : 2 LANTAI
LOKASI : PONPES AL HUDA
DESA BANYU URIP, KECAMATAN SAMBUNG MACAN, KABUPATEN SRAGEN
TAHUN ANGGARAN : 2021

2.1. PEKERJAAN STRUKTUR


JUMLAH HARGA
No. URAIAN PEKERJAAN
(Rp.)

2.1.A. PEKERJAAN STRUKTUR STANDART


PEKERJAAN STRUKTUR ATAS (UPPER STRUCTURE)
A.1 LANTAI 1
A.2 LANTAI 2
A.3 LANTAI DAK ATAP
A.4 RING BALK
A.5 SOPI-SOPI
A.6 RANGKA ATAP BAJA

2.2.B. PEKERJAAN STRUKTUR NON STANDART


PEKERJAAN STRUKTUR BAWAH (SUB STRUCTURE)
B.1 PEKERJAAN STRUKTUR BAWAH
B.2 PEKERJAAN STRUKTUR GWT, RUANG POMPA DAN STP

SUB TOTAL :
DAFTAR KUANTITAS DAN HARGA
PEKERJAAN STRUKTUR

PEKERJAAN : PEMBANGUNAN RUMAH SUSUN TYPE BARAK PANJANG


JUMLAH LANTAI : 2 LANTAI
LOKASI : PONPES AL HUDA
DESA BANYU URIP, KECAMATAN SAMBUNG MACAN, KABUPATEN SRAGEN
TAHUN ANGGARAN : 2021

2.1. PEKERJAAN STRUKTUR


2.1.A. PEKERJAAN STRUKTUR STANDART
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME UNIT
( Rp. ) ( Rp. )

2.1.A. PEKERJAAN STRUKTUR STANDART


A.1 LANTAI 1
1 Kolom K1
- Beton K-300 6.44 M3
- Besi beton 1,478.96 Kg
- Bekisting 65.28 M2
2 Kolom K2
- Beton K-300 ` 20.62 M3
- Besi beton 5,338.92 Kg
- Bekisting 228.48 M2
3 Kolom K3
- Beton K-300 1.45 M3
- Besi beton 342.63 Kg
- Bekisting 15.30 M2
4 Perkerjaan dalam bangunan
- Tanah urug peninggian lantai t=45 cm (dalam bangunan) + pemadatan CBR 6% 264.15 M3
- Pasir urug diatas tanah urug t=10 cm (dalam bangunan) 58.97 M3
- Cor beton lantai kerja Fc' 8,3 Mpa t=5 cm (dalam bangunan) 29.49 M3
5 Perkerjaan luar bangunan
- Tanah urug peninggian lantai t=20 cm (luar bangunan) + pemadatan CBR 5% 32.67 M3
- Pasir urug diatas tanah urug t=10 cm (luar bangunan) 16.34 M3
- Cor beton lantai kerja Fc' 8,3 Mpa t=5 cm (luar bangunan) 8.17 M3
6 Cor beton Lantai Dasar Fc '25 Mpa t=10 cm (dalam bangunan)
- Beton K-300 58.70 M3
- Besi Weremesh M-8 4,974.39 Kg
7 Cor beton Lantai Dasar Fc '25 Mpa t=10 cm (luar bangunan)
- Beton K-300 16.34 M3
- Besi Weremesh M-8 1,134.49 Kg
- Begisting 13.20 M2
8 Ramp (Entrance)
- Beton K-300 0.54 M3
- Besi Weremesh M-8 54.00 Kg
- Bekisting 13.40 M2
9 Tangga lt. 1
- Beton K-300 13.33 M3
- Besi beton 2,424.65 Kg
- Bekisting 36.00 M2
10 Balok Bordes 20x35 cm
- Beton K-300 0.48 M3
- Besi beton 177.40 Kg
- Bekisting 10.80 M2
11 Kolom KB (Tangga)
- Beton K-300 0.21 M3
- Besi beton 44.10 Kg
- Bekisting 3.00 M2
12 Pelat Beton Canopy Jendela t= 10 cm
- Beton K-300 6.43 M3
- Besi beton 953.96 Kg
- Bekisting 79.06 M2
A.2 LANTAI 2
1 Kolom K1
- Beton K-300 3.92 M3
- Besi beton 869.08 Kg
- Bekisting 38.40 M2
2 Kolom K2
- Beton K-300 12.56 M3
- Besi beton 3,019.29 Kg
- Bekisting 134.40 M2
3 Kolom K3
- Beton K-300 0.88 M3
- Besi beton 193.91 Kg
- Bekisting 9.00 M2
4 Balok G1.1
- Beton K-300 8.36 M3
- Besi beton 1,757.17 Kg
- Bekisting 129.49 M2
5 Balok G1.2
- Beton K-300 10.93 M3
- Besi beton 2,407.92 Kg
- Bekisting 157.55 M2
6 Balok G1.3
- Beton K-300 1.69 M3
- Besi beton 394.04 Kg
- Bekisting 29.90 M2
7 Balok G1.4
- Beton K-300 1.89 M3
- Besi beton 418.60 Kg
- Bekisting 27.60 M2
8 Balok G1.5
- Beton K-300 0.69 M3
- Besi beton 203.39 Kg
- Bekisting 10.35 M2
9 Balok B1.1
- Beton K-300 2.53 M3
- Besi beton 449.38 Kg
- Bekisting 36.80 M2
10 Balok B1.2
- Beton K-300 0.39 M3
- Besi beton 449.38 Kg
- Bekisting 5.98 M2
11 Balok B1.3
- Beton K-300 0.89 M3
- Besi beton 531.64 Kg
- Bekisting 13.23 M2
12 Balok B2.1
- Beton K-300 0.11 M3
- Besi beton 217.67 Kg
- Bekisting 2.00 M2
13 Tangga lt.3
- Beton K-300 13.33 M3
- Besi beton 2,424.65 Kg
- Bekisting 36.00 M2
14 Balok Bordes 20x35 cm
- Beton K-300 0.48 M3
- Besi beton 177.40 Kg
- Bekisting 10.80 M2
15 Kolom KB (Tangga)
- Beton K-300 0.21 M3
- Besi beton 44.10 Kg
- Bekisting 3.00 M2
16 Pelat Beton Canopy Jendela t= 10 cm
- Beton K-300 6.43 M3
- Besi beton 953.96 Kg
- Bekisting 79.06 M2
17 Plat lantai 3 t=13 cm
- Beton K-300 68.50 M3
- Besi beton 6,709.40 Kg
- Bekisting 443.44 M2
18 Janggutan Beton
- Beton K-300 0.48 M3
- Besi beton 39.50 Kg
- Bekisting 7.92 M2

A.4 LANTAI DAK ATAP


1 Kolom K2
- Beton K-300 7.72 M3
- Besi beton 1,874.93 Kg
- Bekisting 77.95 M2
2 Kolom K3
- Beton K-300 0.54 M3
- Besi beton 120.30 Kg
- Bekisting 5.22 M2
3 Balok G1.1
- Beton K-300 4.04 M3
- Besi beton 1,243.64 Kg
- Bekisting 67.39 M2
4 Balok G1.2
- Beton K-300 8.17 M3
- Besi beton 2,243.16 Kg
- Bekisting 117.88 M2
5 Balok G1.3
- Beton K-300 0.44 M3
- Besi beton 121.98 Kg
- Bekisting 11.96 M2
6 Balok G1.5
- Beton K-300 0.69 M3
- Besi beton 189.44 Kg
- Bekisting 10.35 M2
7 Balok G2.1
- Beton K-300 0.18 M3
- Besi beton 52.86 Kg
- Bekisting 3.38 M2
8 Balok B1.1
- Beton K-300 2.53 M3
- Besi beton 449.38 Kg
- Bekisting 36.80 M2
9 Balok B1.2
- Beton K-300 0.39 M3
- Besi beton 351.15 Kg
- Bekisting 5.98 M2
10 Balok B1.3
- Beton K-300 0.89 M3
- Besi beton 432.90 Kg
- Bekisting 13.23 M2
11 Balok B2.1
- Beton K-300 0.11 M3
- Besi beton 217.67 Kg
- Bekisting 2.00 M2
12 Plat Dak t=13 cm
- Beton K-300 11.03 M3
- Besi beton 1,248.41 Kg
- Bekisting 88.59 M2
13 Pondasi Water Tank Plat Dak t=20 cm + Beton Pengikat
- Beton K-300 4.48 M3
- Besi beton 344.88 Kg
- Bekisting 14.40 M2

A.5 RING BALK


1 Balok G1.6
- Beton K-300 13.82 M3
- Besi beton 3,191.34 Kg
- Bekisting 247.50 M2
2 Balok G1.7
- Beton K-300 0.86 M3
- Besi beton 200.57 Kg
- Bekisting 24.75 M2
3 Balok B2.1
- Beton K-300 0.11 M3
- Besi beton 220.22 Kg
- Bekisting 2.00 M2

A.6 SOPI-SOPI
1 Kolom K1
- Beton K-300 1.72 M3
- Besi beton 423.15 Kg
- Bekisting 18.60 M2
2 Balok B2.1
- Beton K-300 2.69 M3
- Besi beton 710.22 Kg
- Bekisting 39.10 M2

A.7 RANGKA ATAP BAJA


- Pekerjaan Atap Baja Ringan + Lapis Alumunium Foil 810.58 M2
DAFTAR KUANTITAS DAN HARGA
PEKERJAAN STRUKTUR

PEKERJAAN : PEMBANGUNAN RUMAH SUSUN TYPE BARAK PANJANG


JUMLAH LANTAI : 2 LANTAI
LOKASI : PONPES AL HUDA
DESA BANYU URIP, KECAMATAN SAMBUNG MACAN, KABUPATEN SRAGEN
TAHUN : 2021

2.1.B. PEKERJAAN STRUKTUR NON STANDART


HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME UNIT
( Rp. ) ( Rp. )

2.1.B. PEKERJAAN STRUKTUR NON STANDART


B.1 PEKERJAAN STRUKTUR BAWAH (SUB STRUCTURE)
A.1. Pondasi Telapak dan Tie Beam (Sloof)
1 Pekerjaan Pondasi Telapak
- Pondasi Tipe P-1
- Beton K-300 56.25 M3
- Besi beton 5,965.73 Kg
- Bekisting 108.00 M2
- Pondasi Tipe P-2
- Beton K-300 7.53 M3
- Besi beton 915.16 Kg
- Bekisting 19.68 M2
- Pondasi Tipe P-3
- Beton K-300 66.30 M3
- Besi beton 7,616.07 Kg
- Bekisting 92.40 M2
2 Tie Beam / Sloof TB1
- Beton K-300 24.04 M3
- Besi beton 4,839.13 Kg
- Bekisting 245.76 M2
3 Pek. Rollag Bata (diatas tie beam), 1 bt (diatas tie beam) 106.85 M2
6 Pek. Rollag Bata (diatas tie beam), 1 bt (disisi luar) 52.80 M2
7 Besi Dowel Ø 10-1000 131.58 Kg
8 Pekerjaan Galian tanah :
Pondasi Tipe P-1 76.50 M3
Pondasi Tipe P-2 10.50 M3
Pondasi Tipe P-3 89.25 M3
Tie Beam / Sloof TB1 44.88 M3
9 Pekerjaan Urugan Pasir tebal 10 cm :
Pondasi Tipe P-1 11.25 M3
Pondasi Tipe P-2 1.38 M3
Pondasi Tipe P-3 13.26 M3
Tie Beam / Sloof TB1 5.34 M3
10 Pekerjaan Lantai Kerja tebal 5 cm :
Pondasi Tipe P-1 5.63 M3
Pondasi Tipe P-2 0.69 M3
Pondasi Tipe P-3 6.63
Tie Beam / Sloof TB1 2.67 M3
11 Urugan tanah kembali bekas galian 174.28 M3

B.2 PEKERJAAN STRUKTUR GWT, RUANG POMPA DAN STP


a PEKERJAAN STRUKTUR DASAR GWT
1 Pekerjaan Galian tanah 13.88 M3
2 Pasir urug diatas tanah urug t=10 cm 2.34 M3
3 Cor beton lantai kerja Fc' 8,3 Mpa t=5 cm 1.17 M3
4 Pemadatan tanah CBR > 6% 26.32 M2
5 Pas. Pondas Batu Kali 3.58 M3
6 Batu Pecah/Makadam dipadatkan t=30 cm 1.99 M3
7 Sloof/ Pondasi beton
- Beton K-300 2.10 M3
- Besi beton 467.24 Kg
- Bekisting 21.45 M2
8 Pekerjaan Lantai Dasar GWT
- Beton K-300 7.90 M3
- Besi beton 760.07 Kg
- Bekisting 32.32 M2

b PEKERJAAN STRUKTUR RUANG POMPA


1 Pekerjaan Galian tanah : 9.10 M3
2 Pasir urug diatas tanah urug t=10 cm 0.66 M3
3 Cor beton lantai kerja Fc' 8,3 Mpa t=5 cm 0.33 M3
4 Pas. Pondas Batu Kali 3.98 M3
5 Batu Pecah/Makadam dipadatkan t=30 cm 2.56 M3
6 Sloof/ Pondasi beton
- Beton K-300 2.85 M3
- Besi beton 633.52 Kg
- Bekisting 28.95 M2
7 Pemadatan tanah CBR > 6% 12.00 M2
8 Pekerjaan Lantai Dasar R.Pompa
- Beton K-300 3.15 M3
- Besi beton 265.96 Kg
- Bekisting 3.20 M2
9 Pekerjaan Pelat Dak R.Pompa
- Beton K-300 3.21 M3
- Besi beton 361.87 Kg
- Bekisting 24.43 M2
10 Kolom K1 (R. Pompa)
- Beton K-300 0.63 M3
- Besi beton 112.99 Kg
- Bekisting 8.40 M2
11 Balok B1 (R. Pompa)
- Beton K-300 1.72 M3
- Besi beton 485.27 Kg
- Bekisting 32.92 M2
12 Tie Beam Dasar Pelat (R. Pompa)
- Beton K-300 2.10 M3
- Besi beton 467.24 Kg
- Bekisting 21.45 M2
13 Tie Beam Ramp (ruang pompa)
- Beton K-300 0.07 M3
- Besi beton 16.63 Kg
- Bekisting 1.36 M2
14 Ramp (ruang pompa)
- Beton K-300 0.29 M3
- Besi beton 18.79 Kg
- Bekisting 6.80 M2

c PEKERJAAN STP
1 Pekerjaan Galian tanah 13.13 M3
2 Pasir urug diatas tanah urug t=10 cm 0.53 M3
3 Cor beton lantai kerja Fc' 8.3 Mpa t=5 cm 0.26 M3
4 Pekerjaan Lantai Dasar STP
- Beton K-300 1.98 M3
- Besi beton 124.27 Kg
- Bekisting 2.64 M2
5 Pekerjaan Dinding STP
- Beton K-300 5.40 M3
- Besi beton 381.48 Kg
- Bekisting 58.96 M2
6 Pekerjaan Atap STP
- Beton K-300 0.90 M3
- Besi beton 87.56 Kg
- Bekisting 13.63 M2

d PEKERJAAN RESAPAN
1 Pekerjaan Galian tanah 5.96 M3
2 Pekerjaan Rollag Bata (Dinding Resapan) 18.02 M2
3 Kolom K1 (Resapan)
- Beton K-300 0.40 M3
- Besi beton 77.18 Kg
- Bekisting 6.72 M2
4 Balok BP (Resapan)
- Beton K-300 0.54 M3
- Besi beton 64.87 Kg
- Bekisting 8.16 M2
5 Pelat Atas (Resapan)
- Beton K-300 0.34 M3
- Besi beton 40.24 Kg
- Bekisting 5.52 M2
REKAPITULASI
DAFTAR KUANTITAS DAN HARGA

PEKERJAAN : PEMBANGUNAN RUMAH SUSUN TYPE BARAK PANJANG


JUMLAH LANTAI : 2 LANTAI
LOKASI : PONPES AL HUDA
: DESA BANYU URIP, KECAMATAN SAMBUNG MACAN, KABUPATEN SRAGEN
TAHUN : 2021

3. PEKERJAAN ARSITEKTUR
JUMLAH HARGA
NO. URAIA P E K E R J A A N
(Rp.)

3.A. PEKERJAAN ARSITEKTUR STANDAR

I PEKERJAAN LANTAI SATU

I.1 PEKERJAAN PASANGAN DINDING & BETON PRAKTIS


I.2 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES & RAILING
I.3 PEKERJAAN PLAFOND
I.4 PEKERJAAN LANTAI
I.5 PEKERJAAN UTILITAS
I.6 PEKERJAAN PENGECATAN
I.6 PEKERJAAN RAMP DI ENTRANCE & ASESORIS DI FACADE

II PEKERJAAN LANTAI DUA

II.1 PEKERJAAN PASANGAN DINDING & BETON PRAKTIS


II.2 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES & RAILING
II.3 PEKERJAAN PLAFOND
II.4 PEKERJAAN LANTAI
II.5 PEKERJAAN UTILITAS
II.6 PEKERJAAN PENGECATAN

IV PEKERJAAN LANTAI DAK DAN ATAP

IV.1 PEKERJAAN PASANGAN DINDING & BETON PRAKTIS


IV.2 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES & RAILING
IV.3 PEKERJAAN PLAFOND
IV.4 PEKERJAAN LANTAI
V.5 PEKERJAAN UTILITAS
V.6 PEKERJAAN PENGECATAN
V.7 PEKERJAAN PENUTUP ATAP

3.B PEKERJAAN ARSITEKTUR NON STANDART

3.B.1 PEK. KELILING BAGIAN LUAR BANGUNAN


3.B.2 PEKERJAAN DRAINASE KELILING BAGIAN LUAR BANG.
3.B.3 PEKERJAAN R. POMPA DI LUAR BANGUNAN
3.B.4 PEKERJAAN LAIN-LAIN

JUMLAH HARGA PEKERJAAN ARSITEKTUR


DAFTAR KUANTITAS DAN HARGA
PEKERJAAN : PEMBANGUNAN RUMAH SUSUN TYPE BARAK PANJANG
JUMLAH LANTAI : 2 LANTAI
LOKASI : PONPES AL HUDA
: DESA BANYU URIP, KECAMATAN SAMBUNG MACAN, KABUPATEN SRAGEN
TAHUN : 2021

3. PEKERJAAN ARSITEKTUR
HARGA SATUAN JUMLAH HARGA
NO. JENIS PEKERJAAN VOL. SAT.
(Rp.) (Rp.)

3.A. PEKERJAAN ARSITEKTUR STANDAR

I PEKERJAAN LANTAI SATU

I.1 PEKERJAAN PASANGAN DINDING & BETON PRAKTIS


2
1 Pasangan dinding bata ringan t=10 cm termasuk dinding Railling tangga 609.31 M
2
2 Plester + aci (1:3) mortar dinding exterior/dind. Terluar/dalam 1,034.69 M
2
3 Plester dinding trasram (1:2) 130.33 M
2
4 Perapihan kolom/balok beton dan beton expose termasuk bawah tangga dan Canopy Jendela 384.35 M
1
5 Kolom & Balok praktis 11/11 Kusen 555.23 M
1
6 Pek. Pasang Hand Railling Tangga pipa Galvanis Steel Medium dia 2,5" 27.60 M
2
7 Pas. Keramik 30x60 dinding Km/Wc dan R.Wudhu 320.34 M
1
8 Pas. Plint 10x60 dinding corridor/selasar, R. Pengelola dan Hunian 272.67 M
2
9 Waterproofing (liquid/cement base) dinding t=2,1m km/wc (dinding luar) 129.87 M
10 Pasang Cover plumbing di Kolom Entrace : kalsiboard & rangka besi hollow 4/4 7.20 m'

I.2 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES & RAILING


Kusen Aluminium Powder Coating 3" + Daun Rk Alum + Kaca Clear 8mm+ Jendela kaca clear 6mm + Jaring
1 1.00 Unit
Nyamuk (lengkap terpasang) type PJ-1
Kusen Aluminium Powder Coating 3" + Daun Rk Alum + Kaca Clear 8mm +BV kaca clear 6mm+ Jaring Nyamuk
2 2.00 Unit
(lengkap terpasang) type P-1
Kusen Aluminium Powder Coating . 3" + Daun Pintu Engineering Honeycomb Wood + BV kaca clear 6mm+
3 4.00 Unit
Jaring Nyamuk (lengkap terpasang) type P-2
Kusen Aluminium Powder Coating . 3" + Daun Pintu Engineering Honeycomb Wood + BV kaca clear 6mm+
4 1.00 Unit
Jaring Nyamuk (lengkap terpasang) type P-3
5 Kusen UPVC, Rangka Daun Pintu UPVC. + Louvre UPVC (lengkap terpasang) type PT 20.00 Unit
Kusen Aluminium Powder Coating . 3" + Daun Pintu Engineering Honeycomb Wood (lengkap terpasang) type
6 2.00 Unit
PS
7 Kusen Aluminium Powder Coating . 3" + Daun jendela (lengkap terpasang) type J1 20.00 Unit
8 Kusen Aluminium Powder Coating . 3" + Daun jendela (lengkap terpasang) type J2 12.00 Unit
9 Glassblock 20 x 20 + Beton cetak (terpasang lengkap dengan aksesoris), Type GR1 28.00 Unit
10 Pasang Ornamen Type OW 10.50 m2

I.3 PEKERJAAN PLAFOND


2
1 Penutup plafond gypsum T=9 mm + rangka Holow Galvanish uk rangka 60x60 cm 389.30 M
2
2 Penutup plafond GRC T=6 mm + rangka Holow Galvanish uk rangka 60x60 112.22 M
3 List plafond gypsum 5/5 446.54 M'

I.4 PEKERJAAN LANTAI


2
1 Pasang Homogenous Tile polish lantai Hunian+ Selasar+Entrance+Tangga Uk. 60x60 448.81 M
2
2 Pasang Homogenous Tile unpolish lantai Teras samping dan selasar keliling bangunan Uk. 60x60 150.81 M
2
3 Pasang Keramik lantai R. Wudhu dan Toilet Uk. 30x30 Unpolish 99.22 M
4 Pasang Bordes Homogenous Tile polish Uk. 10x60 92.40 M'
5 PasangHomogenous Tile Step Nozing Tangga Entrance Uk. 10 x 60 cm 23.75 M'
2
6 Waterproofing (liquid/cement base) di daerah canopy jendela 42.15 M

I.5 PEKERJAAN UTILITAS


1 Pasang closet Jongkok type standart (lengkap terpasang) 10.00 Buah
2 Pasang kran 0,5" stainless (lengkap terpasang) 42.00 Buah
3 Pasang shower Fix Shower + stop Kran (lengkap terpasang) 10.00 Buah
4 Pasangan floor drain stainless , di Toilet di Teras, termasuk coring beton 30.00 Buah

I.6 PEKERJAAN PENGECATAN


2
1 Cat dinding bag. Luar termasuk kolom (exterior) 494.65 M
2
2 Cat dinding bag. Dalam termasuk kolom (interior) 942.12 M
2
3 Cat plafond 501.52 M
1
4 Cat list plafond 446.54 M

I.6 PEKERJAAN RAMP DI ENTRANCE & ASESORIS DI FACADE


1 Pekerjaan Ramp
2
- Pek. Pas. Railling Ramp dengan hollow galvanis untuk ramp depan 11.40 M
3
- Pasang beton Ramp 0.83 M
2
- Pasang Homogenous Tile unpolish lantai Ramp Uk. 60x60 8.28 M
2
- Pasangan rollag bata tangga entrance depan & samping + Ramp 9.00 M
II PEKERJAAN LANTAI DUA

II.1 PEKERJAAN PASANGAN DINDING & BETON PRAKTIS


2
1 Pasangan dinding bata ringan t=10 cm termasuk dinding Railling tangga 635.47 M
2
2 Plester + aci (1:3) mortar dinding exterior/dind. Terluar/dalam 969.33 M
2
3 Plester dinding trasram (1:2) 131.23 M
2
4 Perapihan kolom/balok beton dan beton expose termasuk bawah tangga dan Canopy Jendela 356.30 M
2
5 Kolom & Balok praktis 11/11 Kusen 555.00 M
3
6 Pek. Pasang Hand Railling Tangga pipa Galvanis Steel Medium dia 2,5" 30.20 M
2
7 Pas. Keramik 30x60 dinding Km/Wc dan R.Wudhu 323.17 M
3
8 Pas. Plint 10x60 dinding corridor/selasar, Hunian 242.59 M
2
9 Waterproofing (liquid/cement base) dinding t=2,1m km/wc (dinding luar) 129.87 M
10 Pasang Cover plumbing di Kolom Entrace : kalsiboard & rangka besi hollow 4/4 6.80 m'

II.2 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES & RAILING


Kusen Aluminium Powder Coating 3" + Daun Rk Alum + Kaca Clear 8mm+ Jendela kaca clear 6mm + Jaring
1 1.00 Unit
Nyamuk (lengkap terpasang) type PJ-1
Kusen Aluminium Powder Coating . 3" + Daun Pintu Engineering Honeycomb Wood + BV kaca clear 6mm+
2 4.00 Unit
Jaring Nyamuk (lengkap terpasang) type P-2
3 Kusen UPVC, Rangka Daun Pintu UPVC. + Louvre UPVC (lengkap terpasang) type PT 20.00 Unit
Kusen Aluminium Powder Coating . 3" + Daun Pintu Engineering Honeycomb Wood (lengkap terpasang) type
4 2.00 Unit
PS
5 Kusen Aluminium Powder Coating . 3" + Daun jendela (lengkap terpasang) type J1 26.00 Unit
6 Kusen Aluminium Powder Coating . 3" + Daun jendela (lengkap terpasang) type J2 12.00 Unit
7 Glassblock 20 x 20 + Beton cetak (terpasang lengkap dengan aksesoris), Type GR1 34.00 Unit
8 Pasang Ornamen Type OW 11.40 m2
Railing Balkon type R1 , hollow 40.40 & 20.40 tebal 1,2mm termasuk zincromate finish duco & asesoris &
9 2.00 Unit
terpasang
Railing Balkon type R2 , hollow 40.40 & 20.40 tebal 1,2mm termasuk zincromate finish duco & asesoris &
10 1.00 Unit
terpasang

II.3 PEKERJAAN PLAFOND


2
1 Penutup plafond gypsum T=9 mm + rangka Holow Galvanish uk rangka 60x60 cm 405.50 M
2
2 Penutup plafond GRC T=6 mm + rangka Holow Galvanish uk rangka 60x60 112.22 M
3 List plafond gypsum 5/5 452.54 M'

II.4 PEKERJAAN LANTAI


2
1 Pasang Homogenous Tile polish lantai Unit Hunian ,Selasar dan Tangga Uk. 60x60 407.07 M
2
2 Pasang Keramik lantai R. Wudhu dan Toilet Uk. 30x30 Unpolish 99.22 M
3 Pasang Bordes Homogenous Tile polish Uk. 10x60 92.40 M'
4 Pasang Step Nozing Uk. 10 x 60 cm 22.50 M'
2
5 Waterproofing (liquid/cement base) lantai km/wc 99.22 M
2
6 Waterproofing (liquid/cement base) di daerah canopy jendela 45.75 M

II.5 PEKERJAAN UTILITAS


1 Pasang closet Jongkok type standart (lengkap terpasang) 10.00 Buah
2 Pasang kran 0,5" stainless (lengkap terpasang) 42.00 Buah
3 Pasang shower Fix Shower + stop Kran (lengkap terpasang) 10.00 Buah
4 Pasangan floor drain stainless , di Toilet di Teras, termasuk coring beton 32.00 Buah

II.6 PEKERJAAN PENGECATAN


2
1 Cat dinding bag. Luar termasuk kolom (exterior) 398.06 M
2
2 Cat dinding bag. Dalam termasuk kolom (interior) 790.98 M
2
3 Cat plafond 517.72 M
1
4 Cat list plafond 452.54 M

IV PEKERJAAN LANTAI DAK DAN ATAP

IV.1 PEKERJAAN PASANGAN DINDING & BETON PRAKTIS


2
1 Pasangan dinding bata ringan t=10 cm 303.57 M
2
2 Plester + aci (1:3) mortar dinding exterior/dind. Terluar/dalam 544.57 M
2
3 Perapihan kolom/balok beton dan beton expose 57.50 M
3
4 Kolom & Balok praktis 11/11 Kusen 107.34 M

IV.2 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES & RAILING


1 Pintu besi Lengkap terpasang Type PD 2.00 Unit
2 Pasang Glass Block Type GB-1 14.00 Unit
3 Pasang Ornamen Type OW 12.70 m2
4 Pas. Logo PU Plat Baja 80 x 80 t=3mm finish cat duco warna doff terpasang 1.00 Unit

IV.3 PEKERJAAN PLAFOND


2
1 Penutup plafond GRC T=6 mm + rangka Holow Galvanish uk rangka 60x60 158.80 M
2 List plafond gypsum 5/5 270.00 M'

IV.4 PEKERJAAN LANTAI


2
1 Waterproofing Membran Bakar t=3cm lantai Dak ex. Sika/ setara 117.60 M
2
2 Pek. Screed + Aci Lantai Dak Torn 117.60 M
2
3 Cat Epoxy 500 micron Lantai Dak 117.60 M
V.5 PEKERJAAN UTILITAS
1 Pasang Roof Drain Stainless (lengkap terpasang) 10.00 Buah

V.6 PEKERJAAN PENGECATAN


2
1 Cat dinding bag. Luar termasuk kolom (exterior) 370.62 M
2
2 Cat dinding bag. Dalam termasuk kolom (interior) 231.45 M
2
3 Cat plafond 120.88 M
2
4 Cat beton expose 117.60 M
1
5 Cat list plafond 229.00 M

V.7 PEKERJAAN PENUTUP ATAP


2
1 Atap Genteng metal berpasir T=0.35 mm 732.93 M
2 Nok Genteng Metal 43.00 M'
3 Lisplang GRC tebal 9 mm lebar 30 cm + cat exterior 109.70 M'
4 Talang zincalum t= 0,35mm, L=90 cm 63.70 M'
DAFTAR KUANTITAS DAN HARGA

PEKERJAAN : PEMBANGUNAN RUMAH SUSUN TYPE BARAK PANJANG


JUMLAH LANTAI : 2 LANTAI
LOKASI : PONPES AL HUDA
: DESA BANYU URIP, KECAMATAN SAMBUNG MACAN, KABUPATEN SRAGEN
TAHUN : 2021

3. PEKERJAAN ARSITEKTUR

HARGA SATUAN JUMLAH HARGA


NO. JENIS PEKERJAAN VOL. SAT.
(Rp.) (Rp.)

3.B PEKERJAAN ARSITEKTUR NON STANDART TOTAL

3.B.1 PEK. KELILING BAGIAN LUAR BANGUNAN SUB TOTAL

I PEKERJAAN KELILING BANGUNAN DAN TANAMAN

1 Pek. Tanah Subur Pasir urug t = 7 cm 120.65 M3


2 Pek. Tanaman Rumput Gajah Mini 804.31 M2
3 Pek. Tanam Pucuk Merah t= 30 s/d 40 cm 44.00 Btg
4 Pek. Tanaman Zodia 58.00 Btg
5 Pek. Tanaman Ketapang Kencana tinggi 4 m 10.00 Btg

II PEKERJAAN PERKERASAN AKSES JALAN MASUK

1 Pek. Pasir Urug t = 7 cm di Bawah Paving 64.40 M3


2 Pek. Paving Blok t = 8 cm (standart) 920.00 M3
4 Pek. Kanstein uk. 8.40.20 Jalan Sekeliling Bangunan 161.50 M1

3.B.2 PEKERJAAN DRAINASE KELILING BAGIAN LUAR BANG. SUB TOTAL

I DRAINASE LUAR/SEKELILING BANGUNAN

1 Pek. Pasangan 1/2 Bata Saluran 144.15 M2


2 Pek. Plesteran 1:3 104.28 M2
3 Pek. Acian 114.72 M2
4 Pek. Pasir Urug t = 10 cm 2.99 M3
5 Pek. Galian Tanah Saluran 13.83 M3
6 Pek. Buis Beton Setengah Lingkaran 30 cm 124.70 M1
7 Pek. Gorong-Gorong dia. 60 cm Menuju Ke Riol Kota 50.00 M1
8 Pek. Grill penutup saluran, besi siku 50.50.5 + plat strip 16.40 M1

II BAK KONTROL

1 Pek. Pasangan 1/2 Bata Bak Kontrol ( 4 unit BK ) 10.240 M2


2 Pek. Plester + Aci 12.160 M2
3 Pek. Pasir Urug t = 5 cm 0.128 M3
4 Pek. Galian Tanah 3.872 M3

3.B.3. PEKERJAAN R. POMPA DI LUAR BANGUNAN SUB TOTAL

A RUANG POMPA
1 Pek. Pasangan Dinding Bata 1:5 28.29 M2
2 Pek. Plester Dinding Exterior/Dind. Terluar 56.58 M2
3 Pek. Acian Dinding Exterior/Dind. Terluar 56.58 M2
4 Pek. Kolom Praktis & Balok Praktis 11/11 Termasuk Opening Kusen Aluminium 13.16 M'
5 Pek. Perapihan Daerah Dak Beton 33.50 M2
6 Pek. Waterproofing (coating tahan asam, anti toxid + serat fiber) Lantai dan Dinding 66.85 M2
7 Pek. Waterproofing membran bakar t=3cm di Daerah Dak 56.27 M2
8 Pek. Pasang Lantai Keramik 20x20 ad.5 cm (kasar) 16.58 M2
9 Pek. Pasang Keramik Dinding 20x20 55.18 M2
10 Pek. Cat Dinding dan Dak Bag. Luar (exterior) 74.55 M2
11 Pek. Pintu Besi 1.00 Unit
C SEPTICK TANK KONPENSIONAL
1 Pasang Ijuk 10.00 kg
2 Urugan Pasir 0.90 m3
3 Urugan Kerikil 1.80 m3
4 Pipa PVC dia 100 2.50 M1
5 Pipa PVC dia 50 1.50 M1
6 Pipa Vent 1.00 unit

3.B.4. PEKERJAAN LAIN-LAIN SUB TOTAL

A PEKERJAAN AKSESORIS
1 Pek. Pembuatan Lemari Surat 1.00 unit
2 Pek. Nama Ruangan 10x20 cm -acrylic (lengkap terpasang) 25.00 unit
3 Pek. Nama Lantai 30x30 -acrylic (lengkap terPasang) 6.00 unit
4 Pek. Papan Informasi Denah Bangunan 60x120 cm -acrylic (lengkap terpasang) 3.00 unit
5 Pekerjaan Lampu Penerangan Jalan Solarcell 50 watt terpasang berfungsi 10.00 unit
- Tiang Oktagonal Galvanis tinggi : 7 meter
- PV Modul Panel Surya 2x80 WP
- Lampu LED 50 watt Phillip 120 lm
- Battere Lithium 100 Ah 12 VCD
- Box System Battere, Timer dimmer, Terminal Kabel + aksosoris
- Solar Charge Control
- Kabel Panel Surya
- Kabel Lampu
- Garansi 2 tahun
- Pondasi Beton Bertulang K300, dimensi 50 cm x 50 cm x 200 cm
- Angkur Baut dia 16, lengkap terpasang

B PEKERJAAN PAGAR KELILING


1 Pekerjaan Galian Tanah 70.07 M3

2 Pekerjaan Urugan Tanah Kembali 21.02 M3

3 Pekerjaan Urugan Pasir 5.40 M3

4 Pekerjaan Foot Platplat 60 x 60


- Beton K.175 4.39 M3

- Pembesian 549.00 Kg

5 Pekerjaan Kolom Pagar 15 x 15


- Beton K.175 5.76 M3

- Pembesian 691.74 Kg

- Bekisting 76.86 M2

6 Pekerjaan Sloof 15 x 20
- Beton K.175 5.40 M3

- Pembesian 648.00 Kg

- Bekisting 72.00 M2

7 Pekerjaan Ring Balok 15 x 15


- Beton K.175 4.05 M3

- Pembesian 486.00 Kg

- Bekisting 54.00 M2

8 Pas. Pondasi Batu Belah 1 Pc : 4 Ps 41.65 M3

9 Pasangan Batu Bata Merah 1/2 bata 1 : 5 256.50 M2

10 Pekerjaan Plesteran Dinding 1 PC : 4 Ps, tebal 15 mm 513.00 M2

11 Pekerjaan Acian Dinding 513.00 M2

12 Pasangan Roster 20x20 cm 256.50 M2

13 Pengecatan Dinding Eksterior 769.50 M2

14 Pemasangan Nomenklatur (Letter Timbul) Stainless Steel 1.00 LS

15 Pemasangan Lampu sorot led 20 watt IP67 Lengkap dengan Instalasi 4.00 Unit
Pintu Besi Hollow 4 cmx 4 cm, lebar 90 cm, tinggi 3 meter, finishing cat, lengkap
1.00 set
16 dengan engsel dan pengunci + gembok terpasang
C MEJA KURSI TAMAN ( 2 UNIT KURSI LENGKUNG, 1 MEJA BUNDAR) - 2 SET
1 Galian tanah 1.42 m3

2 Pas. Pondasi Batu Belah 1 Pc : 4 Ps 1.42 m3

3 Urugan Pasir 0.24 m3

4 Urugan Sirtu Pengisi Kursi 1.71 m3

5 Pasangan Batu Bata Merah 1/2 bata 1 : 5 12.48 m2

6 Pekerjaan Plesteran Dinding 1 PC : 4 Ps, tebal 15 mm 12.48 m2

7 Pekerjaan Acian Dinding 12.48 m2

8 Pek. Beton Mutu K 175 0.48 m3

Pek. Meja Beton T= 10 cm


9 Pek. Bekisting untuk 3 kali pakai 0.85 m2

10 Pek. Pembesian 10.14 kg

11 Pek. Beton Mutu K 175 0.08 m3


REKAPITULASI
DAFTAR KUANTITAS DAN HARGA
PEKERJAAN MEKANIKAL & ELEKTRIKAL

PEKERJAAN : PEMBANGUNAN RUMAH SUSUN TYPE BARAK PANJANG


JUMLAH LANTAI : 2 LANTAI
LOKASI : PONPES AL HUDA
: DESA BANYU URIP, KECAMATAN SAMBUNG MACAN, KABUPATEN SRAGEN
TAHUN : 2021

IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


JUMLAH HARGA
No. URAIAN PEKERJAAN
(Rp.)

A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

A.1. LANTAI 1
1. PEMIPAAN AIR BERSIH
2. PEMIPAAN AIR KOTOR & AIR BEKAS
3. PEMIPAAN AIR HUJAN
4. PEMIPAAN VENT
5. INSTALASI PANEL
6. INSTALASI KABEL FEEDER
7. INSTALASI KABEL TRAY
8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK
9. INSTALASI PENERANGAN & STOP KONTAK

A.2. LANTAI 2
1. PEMIPAAN AIR BERSIH
2. PEMIPAAN AIR KOTOR & AIR BEKAS
3. PEMIPAAN AIR HUJAN
4. PEMIPAAN VENT
5. INSTALASI PANEL
6. INSTALASI KABEL FEEDER
7. INSTALASI KABEL TRAY
8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK
9. INSTALASI PENERANGAN & STOP KONTAK

A.3. LANTAI ATAP


1. PEMIPAAN AIR BERSIH
2. PEMIPAAN AIR HUJAN

A.4. PEKERJAAN UTILITAS


1. INSTALASI PANEL
2. PEKERJAAN INSTALASI KABEL FEEDER
3. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK
4. INSTALASI PENERANGAN & STOP KONTAK

A.5. PEKERJAAN SISTEM PENTANAHAN


1. INSTALASI
A.6. PEKERJAAN PENANGKAL PETIR
1. INSTALASI

B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART

B.1. PEKERJAAN PEMADAM KEBAKARAN


I INSTALASI FIRE EXTINGUISHER
B.2 PEKERJAAN VENTILASI UDARA
I INSTALASI EXHAUST FAN
B.3. PEKERJAAN SARANA DAN PRASARANA LINGKUNGAN (LUAR BANGUNAN)
I PEKERJAAN INSTALASI PLAMBING
II PENYAMBUNGAN DAYA PLN
III PEKERJAAN INSTALASI KABEL FEEDER

SUB TOTAL :
DAFTAR KUANTITAS DAN HARGA
PEKERJAAN MEKANIKAL & ELEKTRIKAL

PEKERJAAN : PEMBANGUNAN RUMAH SUSUN TYPE BARAK PANJANG


JUMLAH LANTAI : 2 LANTAI
LOKASI : PONPES AL HUDA
: DESA BANYU URIP, KECAMATAN SAMBUNG MACAN, KABUPATEN SRAGEN
TAHUN : 2021

IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


IV. A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

HARGA SATUAN TOTAL HARGA


No. URAIAN PEKERJAAN SAT VOL
(Rp) (Rp)

A. PEKERJAAN MEKANIKAL & ELEKTRIKAL STANDART


A.1. LANTAI 1

1. PEMIPAAN AIR BERSIH


Pipa PVC AW (Incl. Fitting & Accessories)

- PVC AW dia. 15 m 136.00


- PVC AW dia. 20 m 14.00
- PVC AW dia. 32 m 60.00
- PVC AW dia. 40 (Riser dari Tangki Air Atas) m 86.00
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 40 bh 4.00

2. PEMIPAAN AIR KOTOR & AIR BEKAS

Pipa PVC AW (Incl. Fitting & Accessories)


- dia. 150 ( horisontal pipa air kotor ) m 25.00
- dia. 150 ( horisontal pipa air bekas) m 20.00
- dia. 100 m 46.00
- dia. 80 m 42.00
- dia. 50 m 30.00
Clean Out (CO)
- CO, dia. 150 bh 2.00
- CO, dia. 100 bh 2.00
- CO, dia. 80 bh 2.00

3. PEMIPAAN AIR HUJAN


Pipa PVC Kelas AW (Incl. Fitting & Accessories)

- dia. 100 m 28.00


- dia. 80 m 16.00

4. PEMIPAAN VENT

Pipa PVC Kelas D (Incl. Fitting & Accessories)


- Dia. 50 ( pipa riser ) m 10.00
- Dia. 32 m 12.00
5. INSTALASI PANEL
Pengadaan dan pemasangan PP-LT.1 unit 1.00
dengan komponen panel, sbb :

- MCCB 3P, 63 A
- MCB 1P, 16 A
- MCB 1P, 10 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 63 A
- Accessories & Termination
- Box Panel

6. INSTALASI KABEL FEEDER


a. Kabel Distribusi Daya dari MDP :

- NYY 4 x 10 mm2 + E-NYA 10 mm2 ke PP-LT.1 m' 10.00

7. INSTALASI KABEL TRAY

- Kabel Tray W600 x H100 m' 8.00


- Kabel Tray W200 x H100 m' 40.00

Fitting-Fitting :
- Elbow W200 x H100 bh 1.00
- Material bantu ( mur, baut, hanger rod, supporting, dll ) lot 1.00

8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK

- Lampu LED 9 Watt bh 60.00


- Lampu LED 9 Watt, c/w battery charger bh 7.00
- Lampu LED 7 Watt bh 18.00
- Lampu LED 7 Watt, c/w battery charger bh 2.00
- Lampu baret isi TL Bulat-20 watt c/w battery charger bh 2.00
- Exit Lamp-18 watt c/w battery charger bh 3.00
- Stop Kontak 1P, 220 Volt, 13A bh 18.00
- Saklar 1 gang bh 4.00
- Saklar 2 gang bh 23.00
- Saklar Hotel 1 gang bh 2.00
- Saklar Hotel 2 gang bh 2.00

9. INSTALASI PENERANGAN & STOP KONTAK

- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk 92.00
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk 18.00
A.2. LANTAI 2

1. PEMIPAAN AIR BERSIH


Pipa PVC Kelas AW (Incl. Fitting & Accessories)

- PVC AW dia. 15 m 136.00


- PVC AW dia. 20 m 14.00
- PVC AW dia. 32 m 60.00
- PVC AW dia. 40 (Riser dari Tangki Air Atas) m 8.00
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 40 bh 4.00

2. PEMIPAAN AIR KOTOR & AIR BEKAS


Pipa PVC Kelas AW (Incl. Fitting & Accessories)

- dia. 100 m 32.00


- dia. 80 m 50.00
- dia. 50 m 30.00
- Dop, dia. 150 bh 2.00
- Dop, dia. 100 bh 8.00

3. PEMIPAAN AIR HUJAN


Pipa PVC Kelas AW (Incl. Fitting & Accessories)

- dia. 100 m 16.00


- dia. 80 m 2.00
Roof Drain, Cast Iron
- dia. 80 bh 2.00

4. PEMIPAAN VENT

Pipa PVC Kelas D (Incl. Fitting & Accessories)


- Dia. 50 ( pipa riser ) m 10.00
- Dia. 32 m 12.00

- Vent cup Dia. 50 bh 2.00

5. INSTALASI PANEL
Pengadaan dan pemasangan PP-LT.2 unit 1.00
dengan komponen panel, sbb :

- MCCB 3P, 50 A
- MCB 1P, 16 A
- MCB 1P, 10 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 50 A
- Accessories & Termination
- Box Panel
6. INSTALASI KABEL FEEDER
a. Kabel Distribusi Daya dari MDP :

- NYY 4 x 6 mm2 + E-NYA 6 mm2 ke PP-LT.2 m' 16.00

7. INSTALASI KABEL TRAY

- Kabel Tray W200 x H100 m' 40.00

Fitting-Fitting :
- Elbow W200 x H100 bh 1.00
- Material bantu ( mur, baut, hanger rod, supporting, dll ) lot 1.00

8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK

- Lampu LED 9 Watt bh 60.00


- Lampu LED 9 Watt, c/w battery charger bh 7.00
- Lampu LED 7 Watt bh 18.00
- Lampu LED 7 Watt, c/w battery charger bh 2.00
- Lampu baret isi TL Bulat-20 watt c/w battery charger bh 2.00
- Exit Lamp-18 watt c/w battery charger bh 2.00
- Stop Kontak 1P, 220 Volt, 13A bh 18.00
- Saklar 1 gang bh 4.00
- Saklar 2 gang bh 23.00
- Saklar Hotel 1 gang bh 2.00
- Saklar Hotel 2 gang bh 2.00

9. INSTALASI PENERANGAN & STOP KONTAK

- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk 91.00
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk 18.00

A.3. LANTAI ATAP

1. PEMIPAAN AIR BERSIH


Pipa PVC Kelas AW (Incl. Fitting & Accessories)

- PVC AW dia. 40 (Riser ke tanki air atas) m 24.00


- PVC AW dia. 32 (Pipa Drain) m 4.00
- PVC AW dia. 80 (Header) m 4.00

Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 50 bh 14.00
- dia. 80 bh 1.00
- dia. 32 bh 4.00

2. PEMIPAAN AIR HUJAN


Pipa PVC Kelas AW (Incl. Fitting & Accessories)

- dia. 100 m 22.00


Roof Drain, Cast Iron
- dia. 100 bh 8.00
A.4. PEKERJAAN UTILITAS

1. INSTALASI PANEL

a. P-PLN by pln by pln

- MCCB 3P, 80 A : 1 bh
- Accessories & Termination : 1 lot
- Box Panel : 1 unit

b. PEKERJAAN LV-MDP
Pengadaan dan pemasangan LV-MDP , dengan komponen panel, unit 1.00
sbb :

- MCCB 3P, 80 A
- MCCB 3P, 63 A
- MCCB 3P, 50 A
- MCB 3P, 32 A
- Contacto, (timer switch)
- Earth Fault Relay

- Over Current Relay


- Over / Under Voltage Relay
- Power Factor-meter
- Frequency-metr
- Ampere-meter 300/5 A
- Ampere-meter 50/5 A

- Volt-meter 0-500 Volt


- Volt Selector Switch
- CT 300/5 A
- CT 50/5 A
- Fuse Carrier 4 A
- Indicator Lamp
- Rel MCCB 3P
- CU Bar 5 x 80 A
- Accessories & Termination
- Box Panel

c. P-POMPA AIR BERSIH


Pengadaan dan pemasangan P-POMPA AIR BERSIH , dengan kompo- unit 1.00
nen panel, sbb :

- MCB 3P, 32 A
- MCB 3P, 10 A
- WLC 61F G-AP 220 Volt
- DOL ( Direct On Line )
- Radar diantaki air atas
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 32 A
- Accessories & Termination
- Box Panel
2. PEKERJAAN INSTALASI KABEL FEEDER

- NYFGbY 4 x 16 mm2 + E-NYA 16 mm2 Dari P-PLN ke LV-MDP m' 50.00

Kabel Distribusi Daya dari LV-MDP :

- NYY 4 x 6 mm2 + E-NYA 6 mm2 ke P-Air Bersih m' 40.00


- NYY 4 x 4 mm2 + E-NYA 4 mm2 ke P-Shallow Well Pump m' 40.00

3. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK


a. Ruang Pompa

- TL 1 x 18 W, TL Balk Type bh 2.00


- Stop Kontak 1P, 220 Volt, 13A, Wall Type bh 1.00
- Saklar 1 gang bh 2.00

b. Lampu Taman
- Lampu Taman/ Penerangan Luar ( t = 2,5 m ) SL 26 watt bh 16.00

4. INSTALASI PENERANGAN & STOP KONTAK


a. Ruang Pompa

- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk 2.00
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk 1.00

b. Lampu Taman

- NYFGBY 3 x 2,5 mm2 untuk Lampu Taman ttk 16.00

- Testing & Commissioning lot 1.00

A.5. PEKERJAAN SISTEM PENTANAHAN

1. INSTALASI
Pentanahan (Grounding) Netral Sistem & Pentanahan Body

a. - Body Panel

Item SBB:
- Grounding Rod GIP 1' ( untuk R lebih kecil dari 2 ohm ) bh 1.00
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
- Termination R.Supporting Material lot 1.00
- Kabel BC 50 mm2 m 30.00
- Testing & Commissioning lot 1.00

b. - Body Peralatan pada Sistem Elektronik

Item SBB:
- Grounding Rod GIP 1' ( untuk R lebih kecil dari 2 ohm ) bh 1.00
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
- Termination R.Supporting Material lot 1.00
- Kabel BC 50 mm2 m 30.00
- Testing & Commissioning lot 1.00
A.6. PEKERJAAN PENANGKAL PETIR

1. INSTALASI

- Splitzen T=1 meter, pipa galvanized c/w : peralatan bantu unit 6.00
- Bak kontrol 40x40x30 cm unit 1.00
- Down Conduktor BC 50mm + accessories m' 73.00
- Grounding System max. 2 ohm lot 1.00
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
- Biaya Instalasi lot 1.00
- Material Bantu lot 1.00
- Testing & Comissioning included perijinan dari DEPNAKER lot 1.00
- Bracket, Seal , Test Box , dls lot 1.00
DAFTAR KUANTITAS DAN HARGA
PEKERJAAN MEKANIKAL & ELEKTRIKAL

PEKERJAAN : PEMBANGUNAN RUMAH SUSUN TYPE BARAK PANJANG


JUMLAH LANTAI : 2 LANTAI
LOKASI : PONPES AL HUDA
: DESA BANYU URIP, KECAMATAN SAMBUNG MACAN, KABUPATEN SRAGEN
TAHUN : 2021

IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


IV. B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART

HARGA SATUAN TOTAL HARGA


No. URAIAN PEKERJAAN SAT VOL
(Rp) (Rp)

B. PEKERJAAN MEKANIKAL & ELEKTRIKAL NON STANDART

B.1. PEKERJAAN PEMADAM KEBAKARAN

I INSTALASI FIRE EXTINGUISHER

a LANTAI 1

Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :


- Type Class ABC 3,5 kg DCP Seamless, c/w support bh 3.00
- Type Class BC 4,6 kg CO2 Seamless, c/w support bh 1.00

b LANTAI 2
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :

- Type Class ABC 3,5 kg DCP Seamless, c/w support bh 2.00

B.2 PEKERJAAN VENTILASI UDARA

I INSTALASI EXHAUST FAN

1 LANTAI 1
- Exhaust kap 400 Cfm ( axial fan ) unit 10

Pipa PVC Class D

- dia. 100 m 150


- Grille 100 x 100 (Alumunium) bh 100
- Grille 200 x 200 (Alumunium) bh 10
2 LANTAI 2
- Exhaust kap 400 Cfm ( axial fan ) unit 10

Pipa PVC Class D

- dia. 100 m 150


- Grille 100 x 100 (Alumunium) bh 100
- Grille 200 x 200 (Alumunium) bh 10

B.3. PEKERJAAN SARANA DAN PRASARANA LINGKUNGAN (LUAR BANGUNAN)

I PEKERJAAN INSTALASI PLAMBING

I.1 INSTALASI AIR BERSIH


PERALATAN UTAMA

Pengadaan dan pemasangan unit


1 Lift Pump bh 4.00
Type : Centrifugal end suction
Kapasitas : 120 l/menit
Head : 20 mtr
Speed : 2900 rpm
Daya : 1,5 KW/380V/50Hz/3ph
1 duty, 1 standby ( bergantian), lengkap dengan set 1.00
panel control, wlc di Tanki Air Atas dan accessories

2 Distribution Pump set 2.00


Type : Jet Pump (model tutup)
Kapasitas : 34 l/menit
Head : 26 mtr
Daya : 400 W/220V/50Hz/1ph

3 Tangki Air Atas ( Type Cylinder ) unit 4.00


Kapasitas : 1,5 m3
Glass Rainforcement Plastic (GRP), lengkap dengan Assesories dan dudukan/ pondasi

4 PEKERJAAN DEEP WELL unit 1.00


a Pembuatan / Pengeboran sumur dalam
- Kedalaman + 100 Meter
Pipa Casing , Pipa GIP Medium dia 150mm
Pipa Rising dia 80mm
Pipa screen dia 80mm
b Pengadaan dan pemasangan pompa shallow well
- Kapasitas(deb air)150 s/d 200 Lpm, pengadaan dan pemasangan pipa konstruksi : 1 unit
c Instalasi kabel Kontrol WLC : 1 unit
d Instalasi Pipa GIP dia 50 mm ke GWT : 1 unit
e Gate Valve dia 2" : 1 unit
f Bak Kontrol Valve uk, 600 x 600 mm dengan tutup bordes tebal 2 mm : 1 unit
g Panel kontrol shallow well type outdoor : 1 unit
h Pengujian kwalitas air ke laboratorium : 1 unit
i Testing Comissioning & Training : 1 unit
j Material & Alat Bantu : 1 unit

5 Ground Water Tank unit 4.00


Kapasitas : 6 m3
Glass Rainforcement Plastic (GRP), lengkap dengan Assesories dan dudukan/ pondasi

6 ACCESSORIES POMPA
- Gate Valve
dia. 50 bh 2.00
- Check Valve ( CV )
dia. 50 bh 2.00
- Strainer ( STR )
dia. 50 bh 2.00
- Flexible Joint ( FJ )
dia. 50 bh 4.00
- Foot Valve
dia. 50 bh 2.00
- Pressure Gauge bh 2.00
- GIP med dia. 100 ( pipa header ) set 1.00
- Instalasi pemipaan area pompa lot 1.00
c/w fiting-fitting & support.
- Meteran Air c/w GV dia. 50 & Box Meteran unit 1.00
7 INSTALASI PEMIPAAN
Pengadaan dan pemasangan unit.

Pemipaan PPR PN-10 (Incl. Fitting & All Accessories)


a SITE PLAN
1. Dari Box Meter PDAM ke GWT

- GIP dia. 50 (Dari Box Meter PDAM ke GWT) m 6.00


2. Pemipaan R.Pompa ke Shaft
- GIP dia. 65 ( pipa dari GWT ke Shaft ) m 20.00
b Penyambungan pipa PDAM, pipa gip dia. 65 termasuk tidak ditawarkan
Perijinan.

1.2 INSTALASI AIR KOTOR & AIR BEKAS

1 Septic Tank unit 2.00


Kapasitas : 9 m3 /hari

2 Resapan unit 2.00


Kapasitas : 3 m3

- Struktur Pondasi By Sipil

3 TESTING COMMISSIONING lot 1.00


II PENYAMBUNGAN DAYA PLN

1 Pekerjaan Pasang Baru Daya Listrik PLN 23 KVA va 23,000


- BP ( Biaya penyambungan )
- UJL ( Uang Jaminan Langanan )
- Biaya Instalatir
- Concuil
- Pemasangan dan material yang dibutuhkan, seperti ;
( kabel, tiang, pondasi, galian & urugan kembali, dll )

III PEKERJAAN INSTALASI KABEL FEEDER


Kabel Distribusi Daya dari Panel Pompa - Air Bersih

- NYY 4 x 4 mm2 ke LP-1 m' 10.00

- NYY 4 x 4 mm2 ke LP-2 m' 10.00

- Proteksi Kabel dengan Pipa Gip Dia 100 m' 20.00

Pengadaan Pipa Gip Dia 100, termasuk galian dan material bantu lainya

- Testing & Commissioning lot 1.00