REKAPITULASI
DAFTAR KUANTITAS DAN HARGA
PEKERJAAN : PEMBANGUNAN RUMAH SUSUN TYPE BARAK PANJANG
JUMLAH LANTAI : 2 LANTAI
LOKASI : PONPES AL HUDA
DESA BANYU URIP, KECAMATAN SAMBUNG MACAN, KABUPATEN SRAGEN
TAHUN ANGGARAN : 2021
JUMLAH HARGA
No. JENIS PEKERJAAN
( Rp. )
PEKERJAAN PERSIAPAN
TOTAL I + II :
PPN 10 % :
TOTAL
Terbilang :
PT / CV / KSO. ........................
.........................................
DIREKTUR
REKAPITULASI
DAFTAR KUANTITAS DAN HARGA
6 P3K
a Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, dll) Ls 1.00 1
b Ruang P3K (Tempat Tidur Pasien, Stetoskop, Timbangan Berat Badan, Tensi Meter, dll);
Ls 1.00 1
7 Rambu- Rambu terdiri atas : ls 1.00 1
Rambu Petunjuk;
Rambu Larangan;
Rambu Peringatan;
Rambu Kewajiban;
Rambu Informasi;
Rambu Pekerjaan Sementara;
Tongkat Pengatur Lalu Lintas (Warning Lights Stick) ;
Kerucut Lalu Lintas (Traffic Cone) ;
Lampu Putar (Rotary Lamp );
Lampu Selang Lalu Lintas.
SUB TOTAL :
DAFTAR KUANTITAS DAN HARGA
PEKERJAAN STRUKTUR
A.6 SOPI-SOPI
1 Kolom K1
- Beton K-300 1.72 M3
- Besi beton 423.15 Kg
- Bekisting 18.60 M2
2 Balok B2.1
- Beton K-300 2.69 M3
- Besi beton 710.22 Kg
- Bekisting 39.10 M2
c PEKERJAAN STP
1 Pekerjaan Galian tanah 13.13 M3
2 Pasir urug diatas tanah urug t=10 cm 0.53 M3
3 Cor beton lantai kerja Fc' 8.3 Mpa t=5 cm 0.26 M3
4 Pekerjaan Lantai Dasar STP
- Beton K-300 1.98 M3
- Besi beton 124.27 Kg
- Bekisting 2.64 M2
5 Pekerjaan Dinding STP
- Beton K-300 5.40 M3
- Besi beton 381.48 Kg
- Bekisting 58.96 M2
6 Pekerjaan Atap STP
- Beton K-300 0.90 M3
- Besi beton 87.56 Kg
- Bekisting 13.63 M2
d PEKERJAAN RESAPAN
1 Pekerjaan Galian tanah 5.96 M3
2 Pekerjaan Rollag Bata (Dinding Resapan) 18.02 M2
3 Kolom K1 (Resapan)
- Beton K-300 0.40 M3
- Besi beton 77.18 Kg
- Bekisting 6.72 M2
4 Balok BP (Resapan)
- Beton K-300 0.54 M3
- Besi beton 64.87 Kg
- Bekisting 8.16 M2
5 Pelat Atas (Resapan)
- Beton K-300 0.34 M3
- Besi beton 40.24 Kg
- Bekisting 5.52 M2
REKAPITULASI
DAFTAR KUANTITAS DAN HARGA
3. PEKERJAAN ARSITEKTUR
JUMLAH HARGA
NO. URAIA P E K E R J A A N
(Rp.)
3. PEKERJAAN ARSITEKTUR
HARGA SATUAN JUMLAH HARGA
NO. JENIS PEKERJAAN VOL. SAT.
(Rp.) (Rp.)
3. PEKERJAAN ARSITEKTUR
II BAK KONTROL
A RUANG POMPA
1 Pek. Pasangan Dinding Bata 1:5 28.29 M2
2 Pek. Plester Dinding Exterior/Dind. Terluar 56.58 M2
3 Pek. Acian Dinding Exterior/Dind. Terluar 56.58 M2
4 Pek. Kolom Praktis & Balok Praktis 11/11 Termasuk Opening Kusen Aluminium 13.16 M'
5 Pek. Perapihan Daerah Dak Beton 33.50 M2
6 Pek. Waterproofing (coating tahan asam, anti toxid + serat fiber) Lantai dan Dinding 66.85 M2
7 Pek. Waterproofing membran bakar t=3cm di Daerah Dak 56.27 M2
8 Pek. Pasang Lantai Keramik 20x20 ad.5 cm (kasar) 16.58 M2
9 Pek. Pasang Keramik Dinding 20x20 55.18 M2
10 Pek. Cat Dinding dan Dak Bag. Luar (exterior) 74.55 M2
11 Pek. Pintu Besi 1.00 Unit
C SEPTICK TANK KONPENSIONAL
1 Pasang Ijuk 10.00 kg
2 Urugan Pasir 0.90 m3
3 Urugan Kerikil 1.80 m3
4 Pipa PVC dia 100 2.50 M1
5 Pipa PVC dia 50 1.50 M1
6 Pipa Vent 1.00 unit
A PEKERJAAN AKSESORIS
1 Pek. Pembuatan Lemari Surat 1.00 unit
2 Pek. Nama Ruangan 10x20 cm -acrylic (lengkap terpasang) 25.00 unit
3 Pek. Nama Lantai 30x30 -acrylic (lengkap terPasang) 6.00 unit
4 Pek. Papan Informasi Denah Bangunan 60x120 cm -acrylic (lengkap terpasang) 3.00 unit
5 Pekerjaan Lampu Penerangan Jalan Solarcell 50 watt terpasang berfungsi 10.00 unit
- Tiang Oktagonal Galvanis tinggi : 7 meter
- PV Modul Panel Surya 2x80 WP
- Lampu LED 50 watt Phillip 120 lm
- Battere Lithium 100 Ah 12 VCD
- Box System Battere, Timer dimmer, Terminal Kabel + aksosoris
- Solar Charge Control
- Kabel Panel Surya
- Kabel Lampu
- Garansi 2 tahun
- Pondasi Beton Bertulang K300, dimensi 50 cm x 50 cm x 200 cm
- Angkur Baut dia 16, lengkap terpasang
- Pembesian 549.00 Kg
- Pembesian 691.74 Kg
- Bekisting 76.86 M2
6 Pekerjaan Sloof 15 x 20
- Beton K.175 5.40 M3
- Pembesian 648.00 Kg
- Bekisting 72.00 M2
- Pembesian 486.00 Kg
- Bekisting 54.00 M2
15 Pemasangan Lampu sorot led 20 watt IP67 Lengkap dengan Instalasi 4.00 Unit
Pintu Besi Hollow 4 cmx 4 cm, lebar 90 cm, tinggi 3 meter, finishing cat, lengkap
1.00 set
16 dengan engsel dan pengunci + gembok terpasang
C MEJA KURSI TAMAN ( 2 UNIT KURSI LENGKUNG, 1 MEJA BUNDAR) - 2 SET
1 Galian tanah 1.42 m3
A.1. LANTAI 1
1. PEMIPAAN AIR BERSIH
2. PEMIPAAN AIR KOTOR & AIR BEKAS
3. PEMIPAAN AIR HUJAN
4. PEMIPAAN VENT
5. INSTALASI PANEL
6. INSTALASI KABEL FEEDER
7. INSTALASI KABEL TRAY
8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK
9. INSTALASI PENERANGAN & STOP KONTAK
A.2. LANTAI 2
1. PEMIPAAN AIR BERSIH
2. PEMIPAAN AIR KOTOR & AIR BEKAS
3. PEMIPAAN AIR HUJAN
4. PEMIPAAN VENT
5. INSTALASI PANEL
6. INSTALASI KABEL FEEDER
7. INSTALASI KABEL TRAY
8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK
9. INSTALASI PENERANGAN & STOP KONTAK
SUB TOTAL :
DAFTAR KUANTITAS DAN HARGA
PEKERJAAN MEKANIKAL & ELEKTRIKAL
4. PEMIPAAN VENT
- MCCB 3P, 63 A
- MCB 1P, 16 A
- MCB 1P, 10 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 63 A
- Accessories & Termination
- Box Panel
Fitting-Fitting :
- Elbow W200 x H100 bh 1.00
- Material bantu ( mur, baut, hanger rod, supporting, dll ) lot 1.00
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk 92.00
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk 18.00
A.2. LANTAI 2
4. PEMIPAAN VENT
5. INSTALASI PANEL
Pengadaan dan pemasangan PP-LT.2 unit 1.00
dengan komponen panel, sbb :
- MCCB 3P, 50 A
- MCB 1P, 16 A
- MCB 1P, 10 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 50 A
- Accessories & Termination
- Box Panel
6. INSTALASI KABEL FEEDER
a. Kabel Distribusi Daya dari MDP :
Fitting-Fitting :
- Elbow W200 x H100 bh 1.00
- Material bantu ( mur, baut, hanger rod, supporting, dll ) lot 1.00
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk 91.00
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk 18.00
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 50 bh 14.00
- dia. 80 bh 1.00
- dia. 32 bh 4.00
1. INSTALASI PANEL
- MCCB 3P, 80 A : 1 bh
- Accessories & Termination : 1 lot
- Box Panel : 1 unit
b. PEKERJAAN LV-MDP
Pengadaan dan pemasangan LV-MDP , dengan komponen panel, unit 1.00
sbb :
- MCCB 3P, 80 A
- MCCB 3P, 63 A
- MCCB 3P, 50 A
- MCB 3P, 32 A
- Contacto, (timer switch)
- Earth Fault Relay
- MCB 3P, 32 A
- MCB 3P, 10 A
- WLC 61F G-AP 220 Volt
- DOL ( Direct On Line )
- Radar diantaki air atas
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 32 A
- Accessories & Termination
- Box Panel
2. PEKERJAAN INSTALASI KABEL FEEDER
b. Lampu Taman
- Lampu Taman/ Penerangan Luar ( t = 2,5 m ) SL 26 watt bh 16.00
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk 2.00
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk 1.00
b. Lampu Taman
1. INSTALASI
Pentanahan (Grounding) Netral Sistem & Pentanahan Body
a. - Body Panel
Item SBB:
- Grounding Rod GIP 1' ( untuk R lebih kecil dari 2 ohm ) bh 1.00
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
- Termination R.Supporting Material lot 1.00
- Kabel BC 50 mm2 m 30.00
- Testing & Commissioning lot 1.00
Item SBB:
- Grounding Rod GIP 1' ( untuk R lebih kecil dari 2 ohm ) bh 1.00
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
- Termination R.Supporting Material lot 1.00
- Kabel BC 50 mm2 m 30.00
- Testing & Commissioning lot 1.00
A.6. PEKERJAAN PENANGKAL PETIR
1. INSTALASI
- Splitzen T=1 meter, pipa galvanized c/w : peralatan bantu unit 6.00
- Bak kontrol 40x40x30 cm unit 1.00
- Down Conduktor BC 50mm + accessories m' 73.00
- Grounding System max. 2 ohm lot 1.00
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
- Biaya Instalasi lot 1.00
- Material Bantu lot 1.00
- Testing & Comissioning included perijinan dari DEPNAKER lot 1.00
- Bracket, Seal , Test Box , dls lot 1.00
DAFTAR KUANTITAS DAN HARGA
PEKERJAAN MEKANIKAL & ELEKTRIKAL
a LANTAI 1
b LANTAI 2
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
1 LANTAI 1
- Exhaust kap 400 Cfm ( axial fan ) unit 10
6 ACCESSORIES POMPA
- Gate Valve
dia. 50 bh 2.00
- Check Valve ( CV )
dia. 50 bh 2.00
- Strainer ( STR )
dia. 50 bh 2.00
- Flexible Joint ( FJ )
dia. 50 bh 4.00
- Foot Valve
dia. 50 bh 2.00
- Pressure Gauge bh 2.00
- GIP med dia. 100 ( pipa header ) set 1.00
- Instalasi pemipaan area pompa lot 1.00
c/w fiting-fitting & support.
- Meteran Air c/w GV dia. 50 & Box Meteran unit 1.00
7 INSTALASI PEMIPAAN
Pengadaan dan pemasangan unit.
Pengadaan Pipa Gip Dia 100, termasuk galian dan material bantu lainya