DAFTAR HARGA SATUAN UPAH DAN BAHAN

PROVINSI : BENGKULU
KABUPATEN : REJANG LEBONG
KECAMATAN : KOTA PADANG
T.A : 2018

Harga Satuan +
No. Uraian Satuan Harga Satuan PPN (%) Keterangan / Spesifikasi / Ukuran
Pajak

HARGA SATUAN UPAH / HONORARIUM


- Upah Pemasangan Tiang Ls Rp 700,000.00 Rp 700,000.00
- Upah Pemasangan Kabel TR 4 x 35 mm LS Rp 10,000.00 Rp 10,000.00
- Pemasangan Kabel SR Rumah LS Rp 75,000.00 Rp 75,000.00
HARGA SATUAN BAHAN
- Pengadaan Tiang Tinggi 9 m btg Rp 2,500,000.00 250,000 Rp 2,750,000.00
- Pembelian Kabel TR 4 x 35 Meter Rp 45,000.00 4,500 Rp 49,500.00
- Susvensien Clem Breket bh Rp 125,000.00 12,500 Rp 137,500.00
- Clem Tarik/Servis Clem TR bh Rp 75,000.00 7,500 Rp 82,500.00
- Tap Konektor Tunggal bh Rp 17,000.00 1,700 Rp 18,700.00
- Top Konetor Seri bh Rp 35,000.00 3,500 Rp 38,500.00
- Klem Tarik SR bh Rp 70,000.00 7,000 Rp 77,000.00

DAFTAR HARGA SATUAN UPAH DAN BAHAN HALAMAN 1


RENCANA ANGGARAN BIAYA
PENGADAAN LAMPU JALAN
PROVINSI BENGKULU KEGIATAN DANA DESA

KEBUPATEN REJANG LEBONG JENIS KEGIATAN LAMPU JALAN

KECAMATAN P.U.T VOLUME 25 Unit

DESA ULAK TANDING TAHUN ANGGARAN 2019

Harga Satuan Setelah


No Uraian Volume Satuan Jumlah Total
Pajak

A BELANJA UPAH TENAGA KERJA


- Upah Pemasangan Tiang 1.00 unit Rp 700,000.00 Rp 700,000.00
- Upah Pemasangan Kabel TR 4 x 35 mm 36.00 /m Rp 10,000.00 Rp 360,000.00
- Pemasangan Kabel SR Rumah 1.00 unit Rp 75,000.00 Rp 75,000.00
Sub Total Rp 1,135,000.00
Dikali 25.00 Unit Rp 28,375,000.00
B BELANJA PERALATAN KERJA
- Cangkul 2.00 buah Rp 82,500.00 Rp 165,000.00
- Kuas 2" 10.00 buah Rp 3,300.00 Rp 33,000.00
- Sendok semen 5.00 buah Rp 60,500.00 Rp 302,500.00
- Sekop 3.00 buah Rp 82,500.00 Rp 247,500.00
Sub Total Rp 748,000.00
C BELANJA BAHAN KELISTRIKAN
- Pengadaan Tiang Tinggi 9 m 1.00 Unit Rp 2,750,000.00 Rp 2,750,000.00
- Pembelian Kabel TR 4 x 35 1.00 bh Rp 49,500.00 Rp 49,500.00
- Susvensien Clem Breket 13.00 bh Rp 137,500.00 Rp 1,787,500.00
- Clem Tarik/Servis Clem TR 1.00 bh Rp 82,500.00 Rp 82,500.00
- Tap Konektor Tunggal 1.00 bh Rp 18,700.00 Rp 18,700.00
- Top Konetor Seri 1.00 bh Rp 38,500.00 Rp 38,500.00
- Klem Tarik SR 1.00 bh Rp 77,000.00 Rp 77,000.00
Sub Total Rp 4,803,700.00
Sub Total 25.00 Unit Rp 120,092,500.00
D BELANJA BAHAN/MATERIAL
- Semen 1.00 Zak Rp 77,000.00 Rp 77,000.00
- Sirtu 1.00 m3 Rp 181,500.00 Rp 181,500.00
- Cat Besi 5.00 kg Rp 85,800.00 Rp 429,000.00
Sub Total Rp 687,500.00
Dikali 25.00 Unit Rp 17,187,500.00
- JUMLAH TOTAL ( A+ B + C ) Rp 166,403,000.00
- BIAYA PERENCANAAN KTD Rp 3,300,000.00
- BIAYA TEKNIS PELAKSANA KEGIATAN (ATK DAN BARANG PENUNJANG KEGIATAN Rp 1,600,000.00
- TOTAL KEG. LAMPU JALAN Rp 171,303,000.00

Desa Ulak Tanding, .....Februari 2019

Disetujui Oleh , Didampingi /Diverifikasi oleh Dibuat Oleh

PTPKD Desa Ulak Tanding PDTI P.U.Tanding Kader Teknis Desa

........................... ..........................

Mengetahui
Kepala Desa Ulak Tanding

........................