HARGA TOTAL
NO URAIAN PEKERJAAN SATUAN VOLUME KETERANGAN
SATUAN HARGA
I PEKERJAAN PERSIAPAN
1 pembersihan area lapangan LS 1 1,500,000 1,500,000
2 foto dokumentasi LS 1 500,000 500,000
3 bongkar lantai kramik M2 97.75 8,000 782,000
4 Bongkaran flapon M2 103.32 13,000 1,343,160
5 bongkaran kanopy LS 1 750,000 750,000
6 perbaikan retakan dinding LS 1 1,500,000 1,500,000
7 buang puing brangkal ls 1 1,500,000 1,500,000
8 Bongkar atap m2 198.9 45,000 8,950,500
TOTAL 16,825,660
II PEKERJAAN ATAP DAN PENUTUP ATAP BARU
1 pekerjaan atap baja ringan m2 198.9 165,000 32,818,500
2 pekerjaan penutup atap genteng metal m2 198.9 126,000 25,061,400
3 pekerjaan pasangan lisplang GRC m 48.2 68,000 3,277,600
TOTAL 57,879,900
TOTAL 271,435,630
PPN 10 % 27,143,563
SUB TOTAL 298,579,193