Anda di halaman 1dari 52

RENCANA ANGGARAN BIAYA (RAB)

Bidang : Pembangunan
Kegiatan : Pembangunan Reservoar

HARGA SATUAN JUMLAH HARGA


NO URAIAN KEGIATAN SAT. VOL.
(RP) (RP)

I. PEKERJAAN PERSIAPAN
1 Pembersihan Lahan m2 40.00 14,950.00 598,000.00
2 Pemasangan Bouwplank m 25.00 92,690.00 2,317,250.00
3 Papan Nama Pekerjaan Ls 1.00 500,000.00 500,000.00
4 Kesehatan dan Keselamatan Kerja Ls 1.00 2,500,000.00 2,500,000.00
SUB TOTAL I 5,915,250.00

II. PEKERJAAN RESERVOAR


PONDASI TELAPAK
1 Pekerjaan Galian Tanah Biasa m3 0.00 87,980.00 -
2 Pembesian m3 161.54 14,730.00 2,379,437.21
3 Bekisting m3 18.84 228,190.00 4,299,099.60
4 Beton K.225 m3 2.45 1,328,150.00 3,251,311.20

PEKERJAAN BAK AIR


1 Pekerjaan Lantai
a. Pembesian kg 93.75 14,730.00 1,380,900.03
b. Bekisting m2 9.00 228,190.00 2,053,710.00
c. Beton K.225 m3 1.35 1,328,150.00 1,793,002.50
2 Pekerjaan Balok 25 x 30
a. Pembesian kg 102.27 14,730.00 1,506,436.39
b. Bekisting m2 10.20 228,190.00 2,327,538.00
c. Beton K.225 m3 0.90 1,328,150.00 1,195,335.00
3 Pekerjaan Kolom 30x30
a. Pembesian kg 511.02 14,730.00 7,527,300.00
b. Bekisting m2 1.92 228,190.00 438,124.80
c. Beton K.225 m3 1.44 1,328,150.00 1,912,536.00
4 Pekerjaan Kolom 25x25
a. Pembesian kg 119.00 14,730.00 1,752,859.63
b. Bekisting m2 12.00 228,190.00 2,738,280.00
c. Beton K.225 m3 0.75 1,328,150.00 996,112.50
5 Pekerjaan Sloof 20x20
a. Pembesian kg 66.82 14,730.00 984,298.10
b. Bekisting m2 72.00 228,190.00 16,429,680.00
c. Beton K.225 m3 1.35 1,328,150.00 1,793,002.50
6 Pekerjaan Dinding Bak Air
a. Pembesian kg 374.99 14,730.00 5,523,600.11
b. Bekisting m2 7.20 228,190.00 1,642,968.00
c. Beton K.225 m3 0.48 1,328,150.00 637,512.00
7 Pekerjaan Penutup t=12 cm
a. Pembesian kg 93.75 14,730.00 1,380,900.03
b. Bekisting m2 9.00 228,190.00 2,053,710.00
c. Beton K.225 m3 1.08 1,328,150.00 1,434,402.00
8 Pekerjaan Manhole
a. Pembesian kg 9.32 14,730.00 137,305.40
b. Bekisting m2 0.32 228,190.00 73,020.80
c. Beton K.225 m3 0.08 1,328,150.00 102,001.92
9 Lantai Kerja Beton K.100 m3 2.40 1,036,480.00 2,487,552.00
10 Valve All Flange 3" unit 1.00 1,800,000.00 1,800,000.00
11 Pengadaan dan pemasangan Mesin Pompa Diesel 3" unit 1.00 14,452,300.00 14,452,300.00
12 Pemasangan Pipa GIP Ø 3 " m 12.00 373,750.00 4,485,000.00
13 Pemasangan Pipa HDPE PE-100 PN 10 Ø 3 " m 265.00 267,440.00 70,871,600.00
14 Pengecatan Reservoar m2 74.00 48,660.00 3,600,840.00
SUB TOTAL II 165,441,675.71
III. PEKERJAAN BAK INTAKE
PONDASI TELAPAK
1 Pekerjaan Galian Tanah Biasa m3 0.03 87,980.00 2,375.46
2 Pembesian m3 10.65 14,730.00 156,920.46
3 Bekisting m3 0.25 228,190.00 57,047.50
4 Beton K.225 m3 0.02 1,328,150.00 23,906.70

PEKERJAAN BAK INTAKE


1 Galian Tanah Biasa m3 13.50 87,980.00 1,187,730.00
2 Pekerjaan Lantai
a. Pembesian kg 65.10 14,730.00 958,958.35
b. Bekisting m2 1.20 228,190.00 273,828.00
c. Beton K.225 m3 1.80 1,328,150.00 2,390,670.00
3 Pekerjaan Kolom 15x15
a. Pembesian kg 25.59 14,730.00 376,899.69
b. Bekisting m2 3.60 228,190.00 821,484.00
c. Beton K.225 m3 0.14 1,328,150.00 179,300.25
4 Pekerjaan Dinding Bak Air
a. Pembesian kg 146.48 14,730.00 2,157,656.29
b. Bekisting m2 31.20 228,190.00 7,119,528.00
c. Beton K.225 m3 1.80 1,328,150.00 2,390,670.00
5 Lantai Kerja Beton K.100 m3 0.90 1,036,480.00 932,832.00
6 Valve All Flange 3" unit 1.00 1,800,000.00 1,800,000.00
7 Pengadaan dan Pemasangan Pagar BRC 240x150x0.6 m2 30.00 268,920.00 8,067,600.00
8 Pemasangan Pipa GIP Ø 3 " m 24.00 373,750.00 8,970,000.00
SUB TOTAL III 37,867,406.70

IV. PEKERJAAN RUMAH POMPA


1 PEKERJAAN PONDASI
a. Galian Tanah Pondasi m3 8.68 87,980.00 763,666.40
b. Pas. Batu 1PC:4PS m3 5.21 1,092,320.00 5,688,802.56
c. Urugan Pasir t=5 cm m3 0.43 209,530.00 90,936.02

2 PEKERJAAN LANTAI
a. Urugan Pasir t=5 cm m3 0.44 209,530.00 92,193.20
b. Beton K.175 m3 1.06 1,246,600.00 1,316,409.60

3 PEKERJAAN SLOOF 15X12


a. Pembesian kg 69.66 14,730.00 1,026,127.81
b. Bekisting m2 3.72 228,190.00 848,866.80
c. Beton K.175 m3 0.22 1,246,600.00 278,241.12

4 PEKERJAAN KOLOM 15 x 15
a. Pembesian kg 97.82 14,730.00 1,440,931.79
b. Bekisting m2 6.00 228,190.00 1,369,140.00
c. Beton K.175 m3 0.23 1,246,600.00 280,485.00

5 PEKERJAAN BALOK 12x12


a. Pembesian kg 66.57 14,730.00 980,540.97
b. Bekisting m2 2.98 228,190.00 679,093.44
c. Beton K.175 m3 0.18 1,246,600.00 222,592.90

6 KONSTRUKSI KUDA-KUDA
a. Pemasangan Baja Ringan Canal C 75/75 m2 9.44 666,340.00 6,290,249.60
b. Pemasangan Atap Spandek m2 9.44 412,910.00 3,897,870.40

7 PEKERJAAN DINDING
a. Pemasangan Dinding Batu Merah (5x11x22) m2 29.78 163,580.00 4,871,412.40
b. Plesteran 1PC :4PS m3 29.78 67,520.00 2,010,745.60
c. Pengecatan m5 29.78 48,660.00 1,449,094.80

8 LAIN-LAIN
a. Pembuatan & Pemasangan Daun Pintu Kayu Kelas II m2 1.56 757,490.00 1,181,684.40
b. Pembuatan & Pemasangan Kusen Pintu Kayu Kelas II m3 0.02 7,548,950.00 177,400.33
c. Pemasangan Rooster 12x11x24 bh 11.00 115,800.00 1,273,800.00
SUB TOTAL IV 36,230,285.13
JUMLAH 245,454,617.54
PAJAK PERTAMBAHAN NILAI 10% 24,545,461.75
TOTAL 270,000,079.30
TOTAL DIBULATKAN 270,000,000.00
Bidang : Pembangunan
Kegiatan : Pembangunan Reservoar
URAIAN PEKERJAAN : 1 m3 galian tanah biasa sedalam 2 m
HARGA SATUAN : Rp 87,980.00 /m3 Permen No.28/2016 Hal. 579
HARGA HARGA PEKERJAAN
NO. URAIAN PEKERJAAN Kode SATUAN KUANTITAS
(Rp) (Rp)

A. Bahan

B. Tenaga
1. Pekerja L.01 Hari 0.9000 Rp 80,000.00 Rp 72,000.00
2. Mandor L.04 Hari 0.0450 Rp 100,000.00 Rp 4,500.00

C. Peralatan

D. Jumlah (A+B+C) Rp 76,500.00


E. Biaya Umum dan Keuntungan 15% Rp 11,475.00
F. Harga Satuan (D+E) Rp 87,975.00
G. Harga Satuan Pekerjaan (Dibulatkan) Rp 87,980.00

URAIAN PEKERJAAN : Pas. Batu 1PC : 4PS


HARGA SATUAN : Rp 1,092,320.00 /m3 Permen No.28/2016 Hal. 590
HARGA HARGA PEKERJAAN
NO. URAIAN PEKERJAAN Kode SATUAN KUANTITAS
(Rp) (Rp)

A. Bahan
1. Semen M.15 Kg 163.00 Rp 1,550.00 Rp 252,650.00
2. Pasir M.14.b m3 0.52 Rp 137,000.00 Rp 71,240.00
3. Batu M.05 m3 1.20 Rp 331,000.00 Rp 397,200.00

B. Tenaga
1. Pekerja L.01 Hari 1.500 Rp 80,000.00 Rp 120,000.00
2. Tukang Batu L.02 Hari 0.750 Rp 120,000.00 Rp 90,000.00
3. Kepala Tukang L.03 Hari 0.075 Rp 150,000.00 Rp 11,250.00
3. Mandor L.04 Hari 0.075 Rp 100,000.00 Rp 7,500.00

C. Peralatan

D. Jumlah (A+B+C) Rp 949,840.00


E. Biaya Umum dan Keuntungan 15% Rp 142,476.00
F. Harga Satuan (D+E) Rp 1,092,316.00
G. Harga Satuan Pekerjaan (Dibulatkan) Rp 1,092,320.00

URAIAN PEKERJAAN : Urugan Pasir


HARGA SATUAN : Rp 209,530.00 /m3 Permen No.28/2016 Hal. 583
HARGA HARGA PEKERJAAN
NO. URAIAN PEKERJAAN Kode SATUAN KUANTITAS
(Rp) (Rp)

A. Bahan
1. Pasir m3 1.200 Rp 131,000.00 Rp 157,200.00

B. Tenaga
1. Pekerja L.01 Hari 0.300 Rp 80,000.00 Rp 24,000.00
2. Mandor L.04 Hari 0.010 Rp 100,000.00 Rp 1,000.00

C. Peralatan

D. Jumlah (A+B+C) Rp 182,200.00


E. Biaya Umum dan Keuntungan 15% Rp 27,330.00
F. Harga Satuan (D+E) Rp 209,530.00
G. Harga Satuan Pekerjaan (Dibulatkan) Rp 209,530.00
Bidang : Pembangunan
Kegiatan : Pembangunan Reservoar
URAIAN PEKERJAAN : Beton K.225
HARGA SATUAN : Rp 1,328,150.00 /m3 Permen No.28/2016 Hal. 44
HARGA HARGA PEKERJAAN
NO. URAIAN PEKERJAAN Kode SATUAN KUANTITAS
(Rp) (Rp)

A. Bahan
1. Semen Kg 371.000 Rp 1,550.00 Rp 575,050.00
2. Pasir m3 0.499 Rp 137,000.00 Rp 68,363.00
3. Batu Pecah m3 0.776 Rp 375,000.00 Rp 291,000.00
4. Air liter 215.000 Rp 200.00 Rp 43,000.00

B. Tenaga
1. Pekerja L.01 Hari 1.650 Rp 80,000.00 Rp 132,000.00
2. Tukang Batu L.02 Hari 0.275 Rp 120,000.00 Rp 33,000.00
3. Kepala Tukang L.03 Hari 0.028 Rp 150,000.00 Rp 4,200.00
4. Mandor L.04 Hari 0.083 Rp 100,000.00 Rp 8,300.00

C. Peralatan

D. Jumlah (A+B+C) Rp 1,154,913.00


E. Biaya Umum dan Keuntungan 15% Rp 173,236.95
F. Harga Satuan (D+E) Rp 1,328,149.95
G. Harga Satuan Pekerjaan (Dibulatkan) Rp 1,328,150.00

URAIAN PEKERJAAN : Beton K.100


HARGA SATUAN : Rp 1,036,480.00 /m3 Permen No.28/2016 Hal. 592
HARGA HARGA PEKERJAAN
NO. URAIAN PEKERJAAN Kode SATUAN KUANTITAS
(Rp) (Rp)

A. Bahan
1. Portland Cemen kg 230.000 Rp 1,550.00 Rp 356,500.00
2. Pasir Pasang m3 0.638 Rp 137,000.00 Rp 87,406.00
3. Batu Pecah m3 0.761 Rp 375,000.00 Rp 285,375.00
4. Air liter 215.000 Rp 200.00 Rp 43,000.00

B. Tenaga
1. Pekerja L.01 Hari 1.200 Rp 80,000.00 Rp 96,000.00
2. Tukang Batu L.02 Hari 0.200 Rp 120,000.00 Rp 24,000.00
3. Kepala Tukang L.03 Hari 0.020 Rp 150,000.00 Rp 3,000.00
4. Mandor L.04 Hari 0.060 Rp 100,000.00 Rp 6,000.00

C. Peralatan

D. Jumlah (A+B+C) Rp 901,281.00


E. Biaya Umum dan Keuntungan 15% Rp 135,192.15
F. Harga Satuan (D+E) Rp 1,036,473.15
G. Harga Satuan Pekerjaan (Dibulatkan) Rp 1,036,480.00

URAIAN PEKERJAAN : Pembesian


HARGA SATUAN : Rp 14,730.00 /kg Permen No.28/2016 Hal. 599
HARGA HARGA PEKERJAAN
NO. URAIAN PEKERJAAN Kode SATUAN KUANTITAS
(Rp) (Rp)

A. Bahan
1. Besi Beton Ulir/Polos Kg 1.050 Rp 10,325.61 Rp 10,841.89
2. Kawat Beton m3 0.015 Rp 27,825.00 Rp 417.38

B. Tenaga
1. Pekerja L.01 Hari 0.007 Rp 80,000.00 Rp 560.00
2. Tukang L.02 Hari 0.007 Rp 120,000.00 Rp 840.00
3. Kepala Tukang L.03 Hari 0.0007 Rp 150,000.00 Rp 105.00
4. Mandor L.04 Hari 0.0004 Rp 100,000.00 Rp 40.00

C. Peralatan

D. Jumlah (A+B+C) Rp 12,804.27


E. Biaya Umum dan Keuntungan 15% Rp 1,920.64
F. Harga Satuan (D+E) Rp 14,724.91
G. Harga Satuan Pekerjaan (Dibulatkan) Rp 14,730.00
Bidang : Pembangunan
Kegiatan : Pembangunan Reservoar
URAIAN PEKERJAAN : 1 m2 Bekisting
HARGA SATUAN : Rp 228,190.00 /m2 Permen No.28/2016 Hal. 602
HARGA HARGA PEKERJAAN
NO. URAIAN PEKERJAAN Kode SATUAN KUANTITAS
(Rp) (Rp)

A. Bahan
1. Kayu Kelas III btg 0.040 Rp 28,116.67 Rp 1,124.67
2. Paku 5 cm - 10 cm kg 0.400 Rp 22,000.00 Rp 8,800.00
3. Minyak Bekisting liter 0.200 Rp 44,000.00 Rp 8,800.00
4. Balok Kayu Kelas II btg 0.018 Rp 34,222.22 Rp 616.00
5. Plywood 9 mm lembar 0.350 Rp 79,000.00 Rp 27,650.00
6. Kayu Dolken btg 2.000 Rp 25,388.89 Rp 50,777.78

B. Tenaga
1. Pekerja L.01 Hari 0.660 Rp 80,000.00 Rp 52,800.00
2. Tukang Kayu L.02 Hari 0.330 Rp 120,000.00 Rp 39,600.00
3. Kepala Tukang L.03 Hari 0.033 Rp 150,000.00 Rp 4,950.00
4. Mandor L.04 Hari 0.033 Rp 100,000.00 Rp 3,300.00

C. Peralatan

D. Jumlah (A+B+C) Rp 198,418.44


E. Biaya Umum dan Keuntungan 15% Rp 29,762.77
F. Harga Satuan (D+E) Rp 228,181.21
G. Harga Satuan Pekerjaan (Dibulatkan) Rp 228,190.00

URAIAN PEKERJAAN : 1 m3 Pasangan Batu Kosong


HARGA SATUAN : Rp 658,660.00 /m3 Permen No.28/2016 Hal. 594
HARGA HARGA PEKERJAAN
NO. URAIAN PEKERJAAN Kode SATUAN KUANTITAS
(Rp) (Rp)

A. Bahan
1. Batu m3 1.200 Rp 331,000.00 Rp 397,200.00
2. Pasir m3 0.432 Rp 131,000.00 Rp 56,592.00

B. Tenaga
1. Pekerja L.01 Hari 0.780 Rp 80,000.00 Rp 62,400.00
2. Tukang L.02 Hari 0.390 Rp 120,000.00 Rp 46,800.00
3. Kepala Tukang L.03 Hari 0.039 Rp 150,000.00 Rp 5,850.00
4. Mandor L.04 Hari 0.039 Rp 100,000.00 Rp 3,900.00

C. Peralatan

D. Jumlah (A+B+C) Rp 572,742.00


E. Biaya Umum dan Keuntungan 15% Rp 85,911.30
F. Harga Satuan (D+E) Rp 658,653.30
G. Harga Satuan Pekerjaan (Dibulatkan) Rp 658,660.00

URAIAN PEKERJAAN : 1 m Pemasangan Pipa GIP 3"


HARGA SATUAN : Rp 373,750.00 /m Permen No.28/2016 Hal. 792
HARGA HARGA PEKERJAAN
NO. URAIAN PEKERJAAN Kode SATUAN KUANTITAS
(Rp) (Rp)

A. Bahan
1. Pipa GIP 3" m 1.000 Rp 265,000.00 Rp 265,000.00

B. Tenaga
1. Pekerja L.01 Hari 0.400 Rp 80,000.00 Rp 32,000.00
2. Tukang Pipa L.02 Hari 0.200 Rp 120,000.00 Rp 24,000.00
3. Mandor L.04 Hari 0.040 Rp 100,000.00 Rp 4,000.00

C. Peralatan

D. Jumlah (A+B+C) Rp 325,000.00


E. Biaya Umum dan Keuntungan 15% Rp 48,750.00
F. Harga Satuan (D+E) Rp 373,750.00
G. Harga Satuan Pekerjaan (Dibulatkan) Rp 373,750.00
Bidang : Pembangunan
Kegiatan : Pembangunan Reservoar
URAIAN PEKERJAAN : 1 m Pemasangan Pipa HDPE PE-100 PN 10 Ø 4"
HARGA SATUAN : Rp 267,440.00 /m Permen No.28/2016 Hal. 766
HARGA HARGA PEKERJAAN
NO. URAIAN PEKERJAAN Kode SATUAN KUANTITAS
(Rp) (Rp)

A. Bahan
1. Pipa HDPE PE-100 PN 10 Ø 3 " m 1.200 Rp 133,200.00 Rp 159,840.00
2. Perlengkapan/Aksesories % 35.000 Rp 46,620.00 Rp 55,944.00

B. Tenaga
1. Pekerja L.01 Hari 0.054 Rp 80,000.00 Rp 4,320.00
2. Tukang Pipa L.02 Hari 0.090 Rp 120,000.00 Rp 10,800.00
3. Kepala Tukang 0.009 Rp 150,000.00 Rp 1,350.00
4. Mandor L.04 Hari 0.003 Rp 100,000.00 Rp 300.00

C. Peralatan

D. Jumlah (A+B+C) Rp 232,554.00


E. Biaya Umum dan Keuntungan 15% Rp 34,883.10
F. Harga Satuan (D+E) Rp 267,437.10
G. Harga Satuan Pekerjaan (Dibulatkan) Rp 267,440.00

URAIAN PEKERJAAN : Pembersihan


HARGA SATUAN : Rp 14,950.00 /m2 Permen No.28/2016 Hal. 575
HARGA HARGA PEKERJAAN
NO. URAIAN PEKERJAAN Kode SATUAN KUANTITAS
(Rp) (Rp)

A. Bahan

B. Tenaga
1. Pekerja L.01 Hari 0.100 Rp 80,000.00 Rp 8,000.00
2. Mandor L.04 Hari 0.050 Rp 100,000.00 Rp 5,000.00

C. Peralatan

D. Jumlah (A+B+C) Rp 13,000.00


E. Biaya Umum dan Keuntungan 15% Rp 1,950.00
F. Harga Satuan (D+E) Rp 14,950.00
G. Harga Satuan Pekerjaan (Dibulatkan) Rp 14,950.00

URAIAN PEKERJAAN : Bouwplank


HARGA SATUAN : Rp 92,690.00 /m Permen No.28/2016 Hal. 575
HARGA HARGA PEKERJAAN
NO. URAIAN PEKERJAAN Kode SATUAN KUANTITAS
(Rp) (Rp)

A. Bahan
1. Kayu Balok 5/7 Kelas III m3 0.012 Rp 2,530,500.00 Rp 30,366.00
2. Paku 2" - 3" kg 0.020 Rp 26,500.00 Rp 530.00
3. Kayu Papan 3/20 Kelas III m3 0.007 Rp 3,957,000.00 Rp 27,699.00

B. Tenaga
1. Pekerja L.01 Hari 0.100 Rp 80,000.00 Rp 8,000.00
2. Tukang Kayu L.02 Hari 0.100 Rp 120,000.00 Rp 12,000.00
3. Kepala Tukang L.03 Hari 0.010 Rp 150,000.00 Rp 1,500.00
4. Mandor L.04 Hari 0.005 Rp 100,000.00 Rp 500.00

C. Peralatan

D. Jumlah (A+B+C) Rp 80,595.00


E. Biaya Umum dan Keuntungan 15% Rp 12,089.25
F. Harga Satuan (D+E) Rp 92,684.25
G. Harga Satuan Pekerjaan (Dibulatkan) Rp 92,690.00
Bidang : Pembangunan
Kegiatan : Pembangunan Reservoar
URAIAN PEKERJAAN : Pemasangan Atap Spandek
HARGA SATUAN : Rp 412,910.00 /m2 SNI. 2010 Konst. Baja
HARGA HARGA PEKERJAAN
NO. URAIAN PEKERJAAN Kode SATUAN KUANTITAS
(Rp) (Rp)

A. Bahan
1. Spandek 3,2 mm m2 1.100 Rp 52,500.00 Rp 57,750.00
2. Baut Dia.10 mm bh 8.000 Rp 36,000.00 Rp 288,000.00

B. Tenaga
1. Pekerja L.01 Hari 0.020 Rp 80,000.00 Rp 1,600.00
2. Tukang L.02 Hari 0.080 Rp 120,000.00 Rp 9,600.00
3. Kepala Tukang L.03 Hari 0.010 Rp 150,000.00 Rp 1,500.00
4. Mandor L.04 Hari 0.006 Rp 100,000.00 Rp 600.00

C. Peralatan

D. Jumlah (A+B+C) Rp 359,050.00


E. Biaya Umum dan Keuntungan 15% Rp 53,857.50
F. Harga Satuan (D+E) Rp 412,907.50
G. Harga Satuan Pekerjaan (Dibulatkan) Rp 412,910.00

URAIAN PEKERJAAN : Pemasangan Baja Ringan + Reng


HARGA SATUAN : Rp 666,340.00 /m2 SNI. 2010 Konst. Baja
HARGA HARGA PEKERJAAN
NO. URAIAN PEKERJAAN Kode SATUAN KUANTITAS
(Rp) (Rp)

A. Bahan
1. C 75, 0.8 m 1.488 Rp 65,000.00 Rp 96,720.00
2. C 75, 0.6 m 2.232 Rp 65,000.00 Rp 145,080.00
3. Baut bh 28.000 Rp 5,000.00 Rp 140,000.00
4. Dinabold bh 1.600 Rp 10,000.00 Rp 16,000.00
5. Reng 45/45 m 3.600 Rp 29,200.00 Rp 105,120.00

B. Tenaga
1. Pekerja L.01 Hari 0.200 Rp 80,000.00 Rp 16,000.00
2. Tukang L.02 Hari 0.450 Rp 120,000.00 Rp 54,000.00
3. Kepala Tukang L.03 Hari 0.010 Rp 150,000.00 Rp 1,500.00
4. Mandor L.04 Hari 0.050 Rp 100,000.00 Rp 5,000.00

C. Peralatan

D. Jumlah (A+B+C) Rp 579,420.00


E. Biaya Umum dan Keuntungan 15% Rp 86,913.00
F. Harga Satuan (D+E) Rp 666,333.00
G. Harga Satuan Pekerjaan (Dibulatkan) Rp 666,340.00
Pengecatan 1m2 Tembok Baru (1 lapis cat dasar, 2 lapis cat
URAIAN PEKERJAAN : penutup)
HARGA SATUAN : Rp 48,660.00 /m2 Permen No.28/2016 Hal. 746
HARGA HARGA PEKERJAAN
NO. URAIAN PEKERJAAN Kode SATUAN KUANTITAS
(Rp) (Rp)

A. Bahan
1. Cat Tembok Dalam kg 0.120 Rp 100,400.00 Rp 12,048.00
2. Cat Tembok Luar kg 0.180 Rp 122,500.00 Rp 22,050.00

B. Tenaga
1. Pekerja L.01 Hari 0.028 Rp 80,000.00 Rp 2,240.00
2. Tukang L.02 Hari 0.042 Rp 120,000.00 Rp 5,040.00
3. Kepala Tukang L.03 Hari 0.004 Rp 150,000.00 Rp 630.00
4. Mandor L.04 Hari 0.003 Rp 100,000.00 Rp 300.00

C. Peralatan

D. Jumlah (A+B+C) Rp 42,308.00


E. Biaya Umum dan Keuntungan 15% Rp 6,346.20
F. Harga Satuan (D+E) Rp 48,654.20
G. Harga Satuan Pekerjaan (Dibulatkan) Rp 48,660.00
Bidang : Pembangunan
Kegiatan : Pembangunan Reservoar
URAIAN PEKERJAAN : Plesteran 1Pc:4Ps tebal 15 mm
HARGA SATUAN : Rp 67,520.00 /m2 Permen No.28/2016 Hal. 643
HARGA HARGA PEKERJAAN
NO. URAIAN PEKERJAAN Kode SATUAN KUANTITAS
(Rp) (Rp)

A. Bahan
1 Semen kg 6.240 Rp 1,550.00 Rp 9,672.00
2. Pasir m3 0.024 Rp 137,000.00 Rp 3,288.00

B. Tenaga
1. Pekerja L.01 Hari 0.300 Rp 80,000.00 Rp 24,000.00
2. Tukang L.02 Hari 0.150 Rp 120,000.00 Rp 18,000.00
3. Kepala Tukang L.03 Hari 0.015 Rp 150,000.00 Rp 2,250.00
4. Mandor L.04 Hari 0.015 Rp 100,000.00 Rp 1,500.00

C. Peralatan

D. Jumlah (A+B+C) Rp 58,710.00


E. Biaya Umum dan Keuntungan 15% Rp 8,806.50
F. Harga Satuan (D+E) Rp 67,516.50
G. Harga Satuan Pekerjaan (Dibulatkan) Rp 67,520.00

URAIAN PEKERJAAN : Pasangan Batu Merah (5x11x22) 1/2 bata Camp. 1Pc : 4Ps
HARGA SATUAN : Rp 163,580.00 /m2 Permen No.28/2016 Hal. 630
HARGA HARGA PEKERJAAN
NO. URAIAN PEKERJAAN Kode SATUAN KUANTITAS
(Rp) (Rp)

A. Bahan
1 Semen kg 11.500 Rp 1,550.00 Rp 17,825.00
2. Pasir m3 0.043 Rp 126,000.00 Rp 5,418.00
3. Bata Merah bh 70.000 Rp 800.00 Rp 56,000.00

B. Tenaga
1. Pekerja L.01 Hari 0.300 Rp 80,000.00 Rp 24,000.00
2. Tukang L.02 Hari 0.300 Rp 120,000.00 Rp 36,000.00
3. Kepala Tukang L.03 Hari 0.010 Rp 150,000.00 Rp 1,500.00
4. Mandor L.04 Hari 0.015 Rp 100,000.00 Rp 1,500.00

C. Peralatan

D. Jumlah (A+B+C) Rp 142,243.00


E. Biaya Umum dan Keuntungan 15% Rp 21,336.45
F. Harga Satuan (D+E) Rp 163,579.45
G. Harga Satuan Pekerjaan (Dibulatkan) Rp 163,580.00
Pembuatan dan pemasangan 1 m3 kusen pintu
URAIAN PEKERJAAN : kayu kelas II
HARGA SATUAN : Rp 7,548,950.00 /m2 Permen No.28/2016 Hal. 717
HARGA HARGA PEKERJAAN
NO. URAIAN PEKERJAAN Kode SATUAN KUANTITAS
(Rp) (Rp)

A. Bahan
1. Balok Kayu Kelas II m3 1.200 Rp 3,080,000.00 Rp 3,696,000.00
2. Paku 10 kg 1.250 Rp 22,000.00 Rp 27,500.00
3. Lem Kayu kg 1.000 Rp 20,800.00 Rp 20,800.00

B. Tenaga
1. Pekerja L.01 Hari 6.000 Rp 80,000.00 Rp 480,000.00
2. Tukang L.02 Hari 18.000 Rp 120,000.00 Rp 2,160,000.00
3. Kepala Tukang L.03 Hari 1.000 Rp 150,000.00 Rp 150,000.00
4. Mandor L.04 Hari 0.300 Rp 100,000.00 Rp 30,000.00

C. Peralatan

D. Jumlah (A+B+C) Rp 6,564,300.00


E. Biaya Umum dan Keuntungan 15% Rp 984,645.00
F. Harga Satuan (D+E) Rp 7,548,945.00
G. Harga Satuan Pekerjaan (Dibulatkan) Rp 7,548,950.00
Bidang : Pembangunan
Kegiatan : Pembangunan
Pembuatan dan Reservoar
pemasangan 1 m2 Daun Pintu Panel Kayu Kelas II
URAIAN PEKERJAAN :
HARGA SATUAN : Rp 757,490.00 /m2 Permen No.28/2016 Hal. 717
HARGA HARGA PEKERJAAN
NO. URAIAN PEKERJAAN Kode SATUAN KUANTITAS
(Rp) (Rp)

A. Bahan
1. Papan kayu Kelas II m3 0.040 Rp 3,957,000.00 Rp 158,280.00
3. Lem Kayu kg 0.500 Rp 20,800.00 Rp 10,400.00

B. Tenaga
1. Pekerja L.01 Hari 1.000 Rp 80,000.00 Rp 80,000.00
2. Tukang L.02 Hari 3.000 Rp 120,000.00 Rp 360,000.00
3. Kepala Tukang L.03 Hari 0.300 Rp 150,000.00 Rp 45,000.00
4. Mandor L.04 Hari 0.050 Rp 100,000.00 Rp 5,000.00

C. Peralatan

D. Jumlah (A+B+C) Rp 658,680.00


E. Biaya Umum dan Keuntungan 15% Rp 98,802.00
F. Harga Satuan (D+E) Rp 757,482.00
G. Harga Satuan Pekerjaan (Dibulatkan) Rp 757,490.00

URAIAN PEKERJAAN : Beton K.175


HARGA SATUAN : Rp 1,246,600.00 /m3 Permen No.28/2016 Hal. 246
HARGA HARGA PEKERJAAN
NO. URAIAN PEKERJAAN Kode SATUAN KUANTITAS
(Rp) (Rp)

A. Bahan
1. Semen Kg 326.000 Rp 1,550.00 Rp 505,300.00
2. Pasir m3 0.543 Rp 137,000.00 Rp 74,371.43
3. Batu Pecah m3 0.735 Rp 375,000.00 Rp 275,625.00
4. Air liter 215.000 Rp 200.00 Rp 43,000.00

B. Tenaga
1. Pekerja L.01 Hari 1.650 Rp 80,000.00 Rp 132,000.00
2. Tukang Batu L.02 Hari 0.275 Rp 120,000.00 Rp 33,000.00
3. Kepala Tukang L.03 Hari 0.028 Rp 150,000.00 Rp 4,200.00
4. Mandor L.04 Hari 0.165 Rp 100,000.00 Rp 16,500.00

C. Peralatan

D. Jumlah (A+B+C) Rp 1,083,996.43


E. Biaya Umum dan Keuntungan 15% Rp 162,599.46
F. Harga Satuan (D+E) Rp 1,246,595.89
G. Harga Satuan Pekerjaan (Dibulatkan) Rp 1,246,600.00
Bidang : Pembangunan
Kegiatan : Pembangunan Reservoar
URAIAN PEKERJAAN : Pengadaan dan Pemasangan Pagar BRC 240x150x0.6
HARGA SATUAN : Rp 268,920.00 /m3 Permen No.28/2016 Hal. 578
HARGA HARGA PEKERJAAN
NO. URAIAN PEKERJAAN Kode SATUAN KUANTITAS
(Rp) (Rp)

A. Bahan
1. BRC Lengkap dengan Tiang m2 1.100 Rp 205,000.00 Rp 225,500.00

B. Tenaga
1. Pekerja L.01 Hari 0.042 Rp 80,000.00 Rp 3,360.00
2. Tukang Batu L.02 Hari 0.004 Rp 120,000.00 Rp 480.00
3. Kepala Tukang L.03 Hari 0.002 Rp 150,000.00 Rp 300.00
4. Mandor L.04 Hari 0.042 Rp 100,000.00 Rp 4,200.00

C. Peralatan

D. Jumlah (A+B+C) Rp 233,840.00


E. Biaya Umum dan Keuntungan 15% Rp 35,076.00
F. Harga Satuan (D+E) Rp 268,916.00
G. Harga Satuan Pekerjaan (Dibulatkan) Rp 268,920.00
HARGA SATUAN ( RP. ) / KE
NO. U R A I A N SATUAN
BUDONG2 TOBADAK

1 2 3 4 8

I. BAHAN DASAR :

1 Semen ( PC ) :

2 Tonasa 50 Kg Zak 67,000 70,000

3 Tiga Roda 40 Kg Zak 55,000 60,000

4 Tonasa 40 Kg Zak 56,000 60,000

5 Bosowa 40 Kg Zak 54,000 56,000

6 Semen Putih Tiga Roda A Plus ( 50 Kg) Zak 146,000 148,000

7 Potrland Composite Cement (PC 40 Kg) Zak 69,000 73,000

8 Skim Coot 20 Kg Zak 67,000 70,000

9 Batu Merah Buah 800 800

10 Paving Block Buah 2,400 2,400

11 Bataco Buah 3,200 3,200


12 Batako Ringan M3 1,210,000 1,210,000

II. BAHAN JALAN

1 Aspal AC Ton 1,343,800 1,349,300

Adektif (Campuran Aspal) Ltr 85,100 85,100

2 Aspal Emulsi Kg. 18,500 47,460

3 Wetfiks BE Kg. 124,080 124,800

4 Minyak Tanah Ltr 15,900 15,900

5 Solar Ltr 10,100 10,100

6 Pelumas / Oli Ltr 44,000 44,000

III. BAHAN KAYU

1 Kayu Kelas I ( Bayam / Ulin )

- Sawang-sawang M3 4,400,000 4,400,000

168
- Uruh M3 4,400,000 4,400,000

- Saponi M 3
4,400,000 4,400,000

- Palapi M 3
4,400,000 4,400,000

- Merada M3 4,400,000 4,400,000

- Bradak M 3
4,400,000 4,400,000

3 Kayu Kelas II :

- Nato M3 3,080,000 3,080,000

- Balado M3 3,080,000 3,080,000

- Durian M 3
2,760,000 2,760,000

- Bintangor M 3
3,080,000 3,080,000

- Tapi-tapi / Batang 3,080,000 3,080,000

- Bunga-bunga / Batang 3,080,000 3,080,000

- Jambu-jambu / Batang 3,080,000 3,080,000

4 Kayu Kelas III

- Nato M3 2,535,800 2,488,500

- Bawang M 3
2,535,800 2,488,500

- Bakke M 3
2,535,800 2,488,500

- Lenderan M 3
2,535,800 2,488,500

- Dao M 3
2,535,800 2,488,500

-Bollung M 3
2,535,800 2,488,500

- Dagor M 3
2,415,000 2,488,500

Balok Kelas I M3 6,745,000 6,745,000

Papan Kelas I M3 7,300,200 7,300,200

Balok Kelas II M3 3,400,000 3,400,000

Papan Kelas II M3 3,957,000 3,957,000

Kayu Untuk perancah M3 2,285,000 2,285,000

Bambu Btg 27,000 27,000

Daun Pintu air (Ukuran 0,80 M) Buah 11,762,000 11,762,000

Daun Pintu air (Ukuran 1,00 M) Buah 13,992,000 13,992,000

IV. BAHAN LANTAI / DINDING

169
1 Tegel Keramik :

- Putih 20 x 20 cm Dos/M2 63,000 77,000

- Warna 20 x 20 cm Dos/M2 68,500 79,000

- Putih 20 x 25 cm Dos/M2 69,000 73,000

- Warna 20 x 25 cm Dos/M2 73,500 79,000

- Putih 30 x 30 cm Dos/M2 61,500 62,000

- Warna 30 x 30 cm Dos/M 2
67,000 73,000

- Putih 40 x 40 cm Dos/M2 63,000 70,000

- Warna 40 x 40 cm Dos/M2 80,000 82,000

- Warna 50 x 50 cm Dos/M2 116,600 130,500

- Warna 60 x 60 cm Dos/M 2
185,500 198,500

2 Roster Keramik (30 x 30 cm) Buah 70,000 66,000

Roster Keramik (20 x 20 cm) Buah 50,000 44,600

Roster Kaca (20 x 20 cm) Buah 33,000 27,500

Roster Beton 20 x 20 cm Buah 38,500 40,700

Roster Beton 20 x 30 cm Buah 63,000 62,500

Roster Beton 30 x 40 cm Buah 69,300 69,006

3 Batu Alam Marmer ( 10 x 20 ) M 2


328,500 345,100

Palimanan Kasar (10x20) M2 403,200 428,700

Under Sheet Patah / Lurus M2 491,400 500,900

Batu Coral Zak 105,000 120,000

4 Casting (30 x 40 cm) Buah 27,100 38,100

Cincin Beton (Semua Ukuran) Buah 157,500 175,100

Gorong-Gorong (Semua Ukuran) Buah 211,700 232,000

V. BAHAN KACA

1 Kaca Bening 3 mm M2 122,500 157,500

2 Kaca Bening 5 mm M2 183,500 173,500

3 Kaca Rayben 3 mm M2 178,100 214,500

170
4 Kaca Rayben 5 mm M2 211,500 216,500

VI. BAHAN BESI

1 Besi Beton :

- Besi beton diameter = 6 mm Batang 36,300 33,000

- Besi beton diameter = 8 mm Batang 50,000 50,000

- Besi beton diameter = 10 mm Batang 77,000 74,500

- Besi beton diameter = 12 mm Batang 110,000 105,000

- Besi beton diameter = 14 mm Batang 145,000 160,000

- Besi beton diameter = 16 mm Batang 196,100 212,000

- Besi beton diameter = 19 mm Batang 337,200 301,100

- Besi beton diameter = 22 mm Batang 393,800 414,000

- Besi beton diameter = 25 mm Batang 576,000 585,800

2 Besi Ulir :

- Besi beton diameter = 10 mm Batang 74,800 97,600

- Besi beton diameter = 12 mm Batang 140,500 129,500

- Besi beton diameter = 14 mm Batang 192,000 190,500

- Besi beton diameter = 16 mm Batang 246,000 233,500

- Besi beton diameter = 19 mm Batang 360,000 339,800

- Besi beton diameter = 22 mm Batang 456,000 413,500

- Besi beton diameter = 25 mm Batang 576,000 551,800

3 Paku :

1 - Paku Biasa ( 2 - 3 CM ) Kg. 26,500 25,000

- Paku Biasa ( 4 - 10 CM ) Kg. 21,000 22,000

- Paku asbes Kg. 37,000 26,500

- Paku seng ( Payung ) RRT Kg. 47,500 55,000

- Paku Sirap 2 cm Kg. 24,500 27,000

- Paku beton (2-3 cm) Dos 49,875 42,000

- Paku beton (4-10 cm) Dos 38,850 36,225

- Paku Gypsum Dos 50,000 31,500

171
- Baut Buah 33,500 38,000

Kawat :

Kawat beton Kg. 27,825 27,825

Kawat Bronjong (Galvanis 4 mm) M 2


28,500 28,500

Rang Nyamuk dan Bingkai M2 12,000 13,000

Ayakan kecil M2 28,000 29,500

Kawat Duri 10 Kg Roll 185,500 178,500

Kawat Duri 8 Kg Roll 164,500 170,500

Kawat Raam M2 48,000 28,000

Les Aluminium P. 6 m Batang 37,500 37,000

Besi Plat tebal 2 mm Lembar 693,000 733,000

Besi Plat tebal 3 mm Lembar 935,000 944,000

Besi Plat tebal 5 mm Lembar 1,540,000 1,549,000

Besi Siku 30.30.3 Btg. 66,000 65,000

Besi Siku 40.40.4 Btg. 140,000 142,000

Besi Siku 50.50.5 Btg. 137,500 159,500

Besi Siku 60.60.6 Btg. 192,500 201,500

VII BAHAN PIPA

PIPA BESI GIP -

Ø 1/2 inc - 6 m (Medium) A Btg. 85,500 74,000

Ø 3/4 inc - 6 m (Biasa) Btg. 134,000 142,000

Ø 1 inc - 6 m (Medium) A Btg. 189,000 170,500

Ø 1 1/2 inc - 6 m (Medium) B Btg. 245,000 244,000

Ø 1 1/4 inc - 6 m (Medium) B Btg. 228,500 226,800

Ø 2 inc - 6 m (Medium) B Btg. 319,500 289,500

Ø 2 1/2 inc - 6 m (Medium) B Btg. 622,500 595,500

Ø 3 inc - 6 m (Medium) A Btg. 768,000 737,500

172
Ø 3/4 inc - 4 m Btg. 19,500 25,500

Ø 1 inc - 4 m Btg. 26,500 26,500

Ø 1 1/4 inc - 4 m Btg. 37,000 53,000

SS Ø 1 1/2 inc - 4 m Btg. 49,500 62,500

Ø 2 inc - 4 m Btg. 47,700 42,400

Ø 2 1/2 inc - 4 m Btg. 58,500 58,500

Ø 3 inc - 4 m Btg. 79,500 89,600

Ø 4 inc - 4 m Btg. 122,000 141,500

Ø 5 inc - 4 m Btg. 237,500 239,500

Ø 6 inc - 4 m Btg. 324,600 317,600

Ø 8 inc - 4 m Btg. 525,500 556,500

Ø 10 inc - 4 m Btg. 908,200 856,200

Ø 12 inc - 4 m Btg. 1,215,500 1,226,800

3 SAMBUNGAN PIPA

Sambungan Pipa keni 2" Buah 7,000 8,400

Sambungan Pipa keni 3" Buah 11,000 10,600

Sambungan Pipa keni 4" Buah 16,500 28,000

Sambungan Pipa Lurus 2" Buah 6,000 4,500

Sambungan Pipa Lurus 3" Buah 8,500 5,800

Sambungan Pipa Lurus 4" Buah 16,000 15,600

Sambungan Pipa tee 2" Buah 9,000 10,500

Sambungan Pipa tee 3" Buah 16,500 13,700

Sambungan Pipa tee 4" Buah 22,000 33,500

3. PIPA UNTUK INSTALASI LISTRIK

Ø 5/8 inc - 4 m Btg. 11,000 9,500

Ø 3/4 inc - 4 m Btg. 40,000 45,500

Ø 1 inc - 4 m Btg. 50,000 53,000

Ø 1 1/2 inc - 4 m Btg. 92,500 95,000

VIII. BAHAN LANGIT - LANGIT

173
1 - Gypsum Lbr. 83,000 94,000

- Hexa Board Lbr. 83,000 73,700

- Tripleks 122 x 244 cm tebal 2 mm Lbr. 47,700 45,400

- Tripleks 122 x 244 cm tebal 3 mm Lbr. 58,000 66,000

- Tripleks 122 x 244 cm tebal 6 mm Lbr. 82,000 99,000

- Tripleks 122 x 244 cm tebal 3 mm Melamin Lbr. 165,000 138,000

2 - Teakwood 122 x 244 cm tebal 3 mm Lbr. 137,500 148,500

- Teakwood 80 x 244 cm tebal 3 mm Lbr. 102,000 113,000

3 - List profil 3 cm Btg. 22,000 33,000

- List profil 4 cm Btg. 26,300 37,300

- List profil 5 cm Btg. 27,500 38,500

- List profil 7 cm Btg. 33,600 44,600

IX. BAHAN ATAP :

1 - Genteng Metal (Sakura Roof) Lbr. 44,000 37,800

- Seng Gelombang Kecil Kaki 8,000 8,000

- Seng plat lebar 30 cm Meter 16,000 15,000

- Seng plastik ( Fiber ) Kaki 11,000 11,000

- Seng Spandek KR 5 AZ 150 Tebal 0,35 mm Meter 66,000 48,600

- Seng Spandek KR 5 AZ 150 Tebal 0,40 mm Meter 60,500 59,400

- Seng Soka Lbr. 71,500 71,500

3 - Nok Genteng Metal bh 32,000 32,400

- Nok Seng M 33,000 32,400

4 - Talang Karet Meter 10,600 15,000

- Talang Seng Lebar 30 cm Meter 15,000 15,000

- Talang Seng Lebar 40 cm Meter 16,500 19,000

- Talang U - P = 4 m Buah 82,000 79,000

5 Sambungan Talang

- Sambungan Lurus Buah 11,000 8,500

174
- Sambungan Siku Buah 11,200 15,500

- Gantungan Buah 10,500 11,200

- Pancuran Buah 66,000 37,800

X. BAHAN BAJA RINGAN

- Rangka Atap M2 260,000 271,000

XI. BAHAN PENGGANTUNG

1 Kunci Tanam

- Kualitas Biasa Buah 142,200 262,500

- Kualitas baik Buah 180,000 189,500

- Double Handle Kualitas Biasa Buah 225,000 236,900

- Double Handle Kualitas Baik Buah 284,300 299,300

2 Penggantung

- Hak angin kecil Buah 10,500 6,300

- Hak angin besar Buah 16,000 12,000

- Grendel Biasa kecil Buah 6,000 13,000

- Grendel Biasa besar Buah 16,000 26,500

- Grendel Kuningan kecil Buah 16,000 13,700

- Grendel Kuningan besar Buah 28,000 31,500

- Engsel Biasa kecil Psg. 16,000 10,600

- Engsel Biasa besar Psg. 28,000 16,000

- Engsel Kuningan Kecil Psg. 15,800 18,000

- Engsel Kuningan Besar Psg. 16,500 31,500

- Engsel Stainles Kecil Psg. 26,500 15,800

- Engsel Stainles Besar Psg. 37,000 26,500

3 - Pintu PVC Kaca Buah 1,028,200 1,040,000

- Pintu PVC Buah 262,500 302,400

- Pintu Urat Kayu Buah 963,000 972,000

175
XII. BAHAN SANITER

1 Kloset Duduk kualitas baik (Toto)/Lengkap Buah 2,700,000 2,625,000

Kloset Duduk kualitas sedang (Toto) Buah 2,500,000 1,575,000

2 Kloset Jongkok kualitas baik (Toto) Buah 400,000 440,000

Kloset Jongkok kualitas sedang (Toto) Buah 390,000 168,000

3 - Washtafel Stainlesteel 1 Lobang Buah 200,000 199,800

- Washtafel Stainlesteel 2 Lobang Buah 490,000 498,800

- Washtafel Keramik (Toto) Buah 770,000 1,183,000

- Urinoir Buah 1,050,000 1,610,000

4 Tempat Sabun kualitas baik Buah 89,500 69,000

Tempat Sabun kualitas sedang Buah 52,500 52,500

5 Kran air 1/2 inc kualitas biasa Buah 21,000 21,000

Kran air 1/2 inc kualitas baik Buah 31,800 29,500

6 Kran air 3/4 inc kualitas biasa Buah 28,000 27,000

Kran air 3/4 inc kualitas baik Buah 48,000 38,000

7 Drainase filter KM/WC Plastik Buah 16,000 27,300

Drainase filter KM/WC kuningan Buah 47,500 26,300

8 Bak Mandi Biasa Buah 367,500 367,500

9 Bak Mandi Fiber Buah 480,000 707,000

10 Tanki Air Stainless (650 Ltr) Buah 2,640,000 6,468,000

11 Tanki Air Stainless (1200 Ltr) Buah 3,420,000 8,379,000

12 Tanki Air Plastik Fiber (650ML) Buah 950,000 990,000

13 Tanki Air Plastik Fiber (1200ML) Buah 1,450,000 1,540,000

XIII. BAHAN FINISHING / CAT

1 Cat tembok dalam liter 95,400 95,400

2 Cat tembok Luar liter 117,500 117,500

3 Cat Kayu/Besi kaleng 63,000 66,000

176
4 Cat atap kaleng 99,000 157,500

5 Cat marka ltr 73,200 73,200

6 Meni Ltr 33,600 38,000

7 Tenner Ltr 38,000 44,000

8 Dempul Kg. 48,000 38,000

9 Plamur Kg. 50,000 64,800

10 Kertas Gosok M 11,000 11,000

11 Lem Seng M 15,800 15,800

XIV. BAHAN INSTALASI LISTRIK

1 Kabel Listrik

- NYA 1.1/2 mm Eternal Roll 231,000 241,500

- NYA 2.1/2 mm Roll 498,800 498,800

- NYM 2 X 1.5 mm M' 13,200 11,800

- NYM 2 X 2.5 mm M' 14,400 14,000

- NYM 2 X 4 mm M' 18,000 29,000

- NYM 3 X 6 mm M' 33,600 44,600

- NYM 3 X 1.5 mm M' 15,800 14,000

- NYM 3 X 2.5 mm M' 16,800 16,800

- NYM 3 X 4 mm M' 23,000 34,000

- NYM 4 X 2.5 mm M' 31,500 42,500

- NYM 4 X 4 mm M' 42,000 53,000

- NYM 4 X 6 mm M' 48,000 59,000

- NYM 4 X 10 mm M' 72,000 83,000

2 Kabel Twisted Aluminium

- 2 x 16 mm M' 18,000 24,000

- 4 x 16 mm M' 30,000 36,000

- 4 x 25 mm M' 33,600 39,600

- 3 x 35 + 25 mm M' 48,000 54,000

- 3 x 70 + 50 mm M' 54,000 60,000

177
3 Lampu TL (Philips)

- 5 watt Buah 28,500 28,500

- 10 watt Buah 31,800 40,800

- 11 watt Buah 36,000 45,000

- 20 watt Buah 49,800 58,800

- 40 watt Buah 105,000 114,000

4 Lampu TL gantung (Philips)

- 8 watt Buah 38,500 54,000

- 18 watt Buah 55,200 77,500

5 Lampu Pijar

- 5 watt Buah 5,300 9,000

- 10 watt Buah 10,500 13,500

- 15 watt Buah 15,800 15,800

- 25 watt Buah 18,000 21,000

- 40 watt Buah 24,000 27,000

6 Lampu Essential (Philips)

- 5 watt Buah 29,700 30,000

- 8watt Buah 31,500 32,000

- 11 watt Buah 36,300 35,000

- 14 watt Buah 38,500 38,000

- 18 watt Buah 41,800 41,000

- 23 watt Buah 44,000 49,000

7 Lampu Sorot Halogen

- 150 Watt Buah 367,500 380,500

- 500 Watt Buah 377,500 390,500

- 1.000 Watt Buah 387,500 400,500

8 Lampu Taman

178
- SM BG 12" ST KUBEL Buah 112,500 217,500

- SM BG 38 BTD TULIP Buah 132,000 237,000

- SM BG 38 HF LOTUS Buah 112,500 217,500

- SM BG 33 ST LOTUS Buah 112,500 217,500

- SM BG 12" OQ KUBEL Buah 112,500 217,500

- SM BG 15" BTD RDMA Buah 132,000 237,000

9 Lampu Jalan

- 250 Watt Philips Pakai Travo 1 set 937,500 2,297,120

- 250 Watt Tanpa Travo Buah 781,500 1,914,920

10 Shakelar

- Phase tunggal putih (Broco) Buah 24,000 25,000

- Phase tunggal Cokelat (Broco) Buah 27,000 28,000

- Phase double Cokelat Buah 32,000 33,000

11 Stop Kontak

- TV Cable + Stop Buah 58,800 82,400

- Telp. + Stop Buah 56,700 80,000

- TV Cable Buah 46,800 65,500

- Stop Kontak Tunggal Buah 21,000 9,500

- Stop Kontak Telepon Buah 46,800 60,500

- Stop Kontak Seri 4 Buah 68,300 72,300

- Stop Kontak Double Buah 47,300 52,800

12 MCB

- MCB Emby 2- 20 A Buah 66,000 65,600

- Box MCB 1 Group Buah 5,500 7,000

- Box MCB 2 Group Buah 11,000 12,600

- Box MCB 4 Group Buah 27,500 28,300

- Box MCB 8 Group Buah 72,000 78,500

- Box MCB 12 Group Buah 108,000 110,000

13 Fitting tempel Buah 16,000 16,000

Fitting gantung Buah 7,000 7,000

179
Down Light Uk. Kecil Buah 48,000 47,800

Down Light Uk. Sedang Buah 70,000 67,500

Down Light Uk. Besar Buah 90,000 77,500

XV. ALAT BANTU

1 Gerobak dorong Merk Sakai JA60 Buah 495,000 515,000

Gerobak dorong Merk Arco Buah 528,000 570,000

2 Sekop Kualitas Baik Buah 94,000 91,000

Sekop Kualitas Sedang Buah 72,000 72,000

3 Sendok semen Buah 21,000 24,500

4 Palu Kecil Buah 42,000 47,500

5 Palu Sedang Buah 50,000 52,500

6 Gergaji Sedang Buah 50,000 72,000

7 Gergaji Besar Buah 94,500 110,000

8 Meter Roll : 50 M Rol 100,000 89,500

9 7M Rol 47,500 53,000

10 5M Rol 28,000 27,000

11 Siku : 30 Cm Buah 49,500 50,300

12 25 Cm Buah 30,000 30,000

13 Pahat Besar Buah 71,500 52,500

14 Pahat kecil Buah 27,500 42,000

15 Bambu Besar Buah 19,000 23,000

16 Bambu Sedang Buah 16,000 20,000

17 Bambu Kecil Buah 10,500 14,500

XVI. BAHAN ALUMINIUM

1 Pintu Seloding Kaca Uk. Standar Buah 1,701,000 1,966,000

2 Kuseng Kaca Mati M2 945,000 1,210,000

3 Pintu Has Tower Kaca (200 CM x 1200 CM) Buah 1,071,000 1,336,000

4 Jendela Kain 1 Lubang (200 CM x 200 CM) Buah 2,268,000 2,533,000

5 Jendela Dorong (200 CM x 200 CM) Buah 2,016,000 2,276,000

6 Pintu Sming/Partisi+Hanle (100 CM x 100 CM) Buah 2,205,000 2,465,000

180
7 Pintu Holidoor Buah 1,512,000 1,772,000

8 Pintu Maraton Buah 1,890,000 2,150,000

9 Door Koloser Buah 1,890,000 2,150,000

10 Engsel Tanam Aluminium (Door Max) Buah 63,000 56,700

181
HARGA SATUAN ( RP. ) / KECAMATAN
KET
KAROSSA Topoyo PANGALE

9 10 11 12

71,500 77,500 76,000

60,500 67,000 55,000

60,500 54,000 54,000

60,000 53,000 60,000

147,000 146,000 143,000

73,000 79,000 75,000

71,500 71,500 69,000

800 800 750

2,650 2,500 2,500

3,200 3,200 3,200


1,250,000 1,210,000 1,210,000

1,343,800 1,343,800 1,343,800

85,100 85,100 85,100

27,200 33,900 33,900

118,800 118,800 118,800

15,900 15,900 15,900

10,100 10,100 10,100

44,000 44,000 44,000

4,400,000 4,400,000 4,400,000

182
4,400,000 4,400,000 4,400,000

4,400,000 4,400,000 4,400,000

4,400,000 4,400,000 4,400,000

4,400,000 4,400,000 4,400,000

4,400,000 4,400,000 4,400,000

3,080,000 3,080,000 3,080,000

3,080,000 3,080,000 3,080,000

2,760,000 2,760,000 2,760,000

3,080,000 3,080,000 3,080,000

3,080,000 3,080,000 3,080,000

3,080,000 3,080,000 3,080,000

3,080,000 3,080,000 3,080,000

2,470,800 2,530,500 2,535,800

2,470,800 2,530,500 2,535,800

2,470,800 2,530,500 2,535,800

2,470,800 2,530,500 2,535,800

2,470,800 2,530,500 2,535,800

2,470,800 2,530,500 2,535,800

2,470,800 2,530,500 2,535,800

6,745,000 6,745,000 6,745,000

7,300,200 7,300,200 7,300,200

3,400,000 3,400,000 3,400,000

3,957,000 3,957,000 3,957,000

2,285,000 2,285,000 2,285,000

27,000 27,000 27,000

11,762,000 11,773,000 11,773,000

13,992,000 14,003,000 14,003,000

183
77,000 68,500 71,500

88,000 73,500 71,500

78,700 68,900 77,000

88,000 68,250 73,500

72,500 72,500 61,000

88,000 94,700 67,200

68,900 68,900 63,000

104,000 74,200 68,900

143,000 107,800 100,100

262,000 187,000 198,000

77,000 65,000 70,000

43,500 50,500 50,500

52,500 31,500 29,000

60,700 70,800 70,800

99,500 115,800 115,800

109,200 127,500 127,500

111,500 349,500 349,800

388,700 428,100 428,100

468,000 495,900 500,900

105,000 115,000 115,500

28,100 33,100 31,000

157,500 170,100 180,000

211,700 227,000 227,000

157,500 131,500 165,000

210,000 194,500 210,000

184,000 135,000 176,000

184
262,500 216,000 247,500

42,350 42,350 36,300

55,000 50,000 49,155

82,500 71,500 69,360

115,500 79,500 99,000

145,000 144,500 132,500

239,000 201,500 206,000

337,500 342,500 342,000

394,000 399,000 394,000

576,000 581,000 585,500

99,600 79,800 79,500

140,500 145,500 150,000

192,000 197,000 201,500

246,000 251,000 255,500

360,000 365,000 369,500

456,000 461,000 465,500

576,000 581,000 585,500

38,000 26,500 20,000

28,000 22,000 17,000

37,000 37,000 42,000

66,000 66,000 42,000

26,500 33,000 37,000

71,925 60,900 60,900

79,000 79,000 68,500

37,000 37,000 47,500

185
38,500 36,000 38,500

33,000 27,825 28,000

32,600 34,700 38,000

26,500 15,000 16,000

38,500 25,000 21,500

210,000 198,000 204,000

176,000 176,600 181,500

26,500 25,000 31,500

52,500 37,000 37,500

693,000 731,000 732,000

940,000 939,000 944,000

1,628,000 1,544,000 1,549,000

71,500 64,500 69,000

143,000 143,000 145,000

165,000 123,500 143,500

198,500 196,500 201,500

- - -

189,000 56,000 61,500

210,000 140,500 71,500

315,000 168,600 83,500

385,000 241,600 276,700

330,000 224,700 231,000

367,500 286,500 133,500

652,500 59,000 606,500

800,000 730,500 750,800

186
26,500 26,500 27,500

42,000 37,500 37,000

63,000 34,000 35,000

84,000 41,600 43,400

94,500 51,000 51,000

115,500 69,000 73,500

157,500 79,500 74,200

210,000 132,500 127,200

352,000 231,000 244,000

472,500 314,600 367,500

682,500 614,500 498,800

997,500 910,200 787,500

1,325,000 1,215,500 1,249,600

8,400 7,300 8,400

13,800 9,500 12,700

26,500 16,000 17,800

5,500 6,500 6,300

10,500 9,600 11,700

17,500 16,500 15,800

10,500 10,500 12,800

15,800 16,700 15,800

36,800 21,200 21,200

10,500 10,500 8,500

44,520 43,000 42,000

53,000 51,400 54,400

63,000 95,500 98,500

187
99,000 89,000 94,000

83,500 730,300 72,400

61,000 47,200 47,300

66,000 63,600 54,000

88,000 79,000 78,800

132,000 171,000 133,000

143,000 143,500 148,500

110,000 108,000 113,000

26,500 28,000 33,000

31,500 32,300 37,300

27,500 33,500 38,500

34,700 39,600 44,600

38,500 37,000 36,800

8,000 11,000 6,600

17,000 16,800 12,600

11,600 12,500 18,000

63,600 52,500 49,500

69,000 58,800 60,500

77,000 73,500 71,500

33,000 32,100 33,000

26,500 34,100 33,000

10,500 10,500 15,800

16,000 13,500 16,500

19,000 16,000 22,000

75,300 76,300 78,800

10,500 8,400 10,000

188
16,000 17,000 16,000

10,500 10,500 8,400

32,000 47,500 25,000

260,000 266,000 271,500

157,500 165,400 105,000

210,000 199,500 157,500

262,500 249,400 262,500

315,000 299,300 420,000

11,000 10,500 5,300

16,000 16,000 8,400

6,000 6,500 5,300

11,000 16,000 16,500

10,500 8,600 12,600

21,000 21,000 26,300

10,600 10,600 10,600

19,000 16,000 12,600

16,000 16,000 26,300

26,500 26,300 36,800

22,000 26,500 22,000

33,000 37,000 33,000

1,320,000 963,000 1,312,500

550,000 299,600 308,000

1,106,000 963,000 525,000

189
4,200,000 2,625,000 2,600,000

1,575,000 1,575,000 1,890,000

420,000 406,600 418,000

440,000 168,000 315,000

330,000 198,000 289,000

660,000 540,000 472,500

1,050,000 845,000 1,312,500

1,170,000 1,150,000 1,225,000

105,000 89,500 84,000

55,000 52,500 63,000

38,500 21,000 20,000

165,000 31,500 28,000

49,500 26,300 31,500

165,000 36,800 68,500

10,000 19,500 21,000

26,300 47,500 36,800

367,500 224,700 315,000

424,000 505,000 529,000

1,995,000 4,620,000 8,085,000

2,625,000 5,985,000 10,473,750

990,000 1,020,000 935,000

1,590,000 1,560,000 1,430,000

99,000 100,400 100,000

106,000 122,500 127,000

71,500 66,000 60,000

190
126,500 108,000 120,800

44,000 78,200 82,700

27,500 33,600 36,800

55,000 36,800 31,500

31,500 33,600 39,000

64,800 64,200 66,000

10,500 10,500 16,000

16,000 20,800 20,500

265,000 231,000 577,500

371,000 498,800 498,800

11,800 13,200 12,200

12,600 14,400 13,200

21,000 24,000 28,000

41,600 39,600 43,600

15,800 15,600 14,300

17,800 16,800 15,400

21,200 29,000 33,000

31,500 37,500 41,500

50,000 48,000 52,000

56,000 54,000 58,000

66,000 78,000 82,000

8,500 21,000 23,500

34,000 33,000 35,500

37,600 36,600 39,100

52,000 51,000 53,500

58,000 57,000 59,500

191
27,500 33,500 37,500

33,000 36,800 40,000

38,500 41,000 44,100

47,200 54,800 57,800

105,000 110,000 105,000

40,000 67,500 67,500

55,000 96,600 169,050

10,500 5,300 5,300

16,000 12,500 14,000

15,800 15,800 15,800

19,300 20,000 21,500

26,000 26,000 27,500

29,700 32,400 29,700

34,500 34,800 40,000

39,800 38,400 42,000

41,400 40,800 47,300

47,300 43,200 52,500

57,800 48,000 63,000

367,500 373,500 379,000

397,500 383,500 389,000

407,500 393,500 399,000

192
142,000 137,500 160,500

161,500 157,000 180,000

142,000 137,500 160,500

142,000 137,500 160,500

142,000 137,500 160,500

161,500 157,000 180,000

1,406,500 1,640,800 1,640,800

1,172,300 1,367,800 1,367,800

26,000 27,000 28,400

29,000 30,000 31,500

34,000 35,000 36,800

154,500 103,000 103,000

85,000 100,000 100,000

60,500 82,000 82,000

21,000 12,000 11,000

88,000 82,000 82,000

73,300 71,300 69,300

54,300 51,300 48,800

63,600 64,100 67,500

16,000 17,000 10,000

21,000 14,000 14,500

31,500 33,000 29,000

75,500 77,000 73,000

110,000 111,500 113,000

13,000 18,000 16,500

7,500 7,200 10,500

193
48,000 49,500 50,800

68,400 69,500 70,500

78,800 80,000 80,500

425,000 510,000 472,500

498,700 500,200 525,000

89,500 96,000 94,500

68,300 78,000 84,000

26,300 24,000 31,500

42,000 42,000 68,500

47,300 47,500 84,000

52,500 78,000 100,000

131,500 94,500 115,500

89,500 100,000 120,000

52,500 47,500 77,000

27,500 30,000 33,000

52,000 51,500 52,500

30,500 30,000 31,500

50,000 68,500 52,500

25,000 25,300 26,500

25,000 23,000 24,000

21,800 20,000 20,500

16,500 14,200 15,300

1,936,000 1,846,000 1,956,000

1,180,000 1,090,000 1,200,000

1,306,000 1,216,000 1,326,000

2,503,000 2,413,000 2,523,000

2,246,000 2,156,000 2,266,000

2,455,000 2,345,000 2,455,000

194
1,762,000 1,652,000 1,762,000

2,140,000 2,030,000 2,140,000

2,140,000 2,030,000 2,140,000

57,700 64,000 57,800

195
DAFTAR HARGA SATUAN BAHAN MATERIAL

HARGA SATUAN ( RP. ) / KECAMAT


NO. U R A I A N SATUAN
Topoyo TOBADAK KAROSSA

1 2 3 4 8 9
1 Batu Gunung M3 250,000 330,000 250,000

2 Batu Kali M3 308,000 320,000 308,000

3 Pasir Urug M3 108,000 120,000 108,000

4 Pasir Pasang M3 114,000 126,000 114,000

5 Kerikil Sungai M3 196,000 207,000 178,000

6 Batu Pecah 7 - 10 cm M3 333,000 345,000 316,000

7 Batu Pecah 5 - 7 cm M3 333,000 345,000 316,000

8 Batu Pecah 3 - 5 cm M3 346,000 357,000 328,000

9 Batu Pecah 2 - 3 cm M3 352,000 363,000 335,000

10 Batu Pecah 1 - 2 cm M3 358,000 370,000 341,000

11 Batu Pecah 0.5 - 1 cm M3 371,000 382,000 353,000

12 Agregat Base M3 345,500 297,000 379,500

13 Tanah Timbunan Pilihan M3 121,000 132,000 121,000

14 Tanah Timbunan Biasa M3 102,000 113,000 102,000

190
DAFTAR HARGA SATUAN UPAH KERJA

HARGA SATUAN ( RP. ) / KECAMAT

NO. U R A I A N SATUAN TOPOYO TOBADAK KAROSSA

1 2 3 4 5 6

1 Kepala Tukang Org/Hari Rp 150,000 Rp 170,000 Rp 150,000

2 Tukang Kayu Org/Hari Rp 120,000 Rp 120,000 Rp 120,000

3 Tukang Batu Org/Hari Rp 120,000 Rp 120,000 Rp 120,000

4 Tukang Besi Org/Hari Rp 120,000 Rp 120,000 Rp 120,000

5 Mandor / Pengawas Org/Hari Rp 100,000 Rp 157,500 Rp 100,000

6 Pekerja/ Buruh Terlatih Org/Hari Rp 80,000 Rp 85,000 Rp 80,000

7 Pekerja tak terlatih Org/Hari Rp 70,000 Rp 85,000 Rp 70,000

8 Penjaga Gudang Org/Hari Rp 70,000 Rp 70,000 Rp 70,000

9 Penjaga Malam Org/Hari Rp 80,000 Rp 80,000 Rp 80,000

10 Operator Org/Hari Rp 280,000 Rp 280,000 Rp 280,000

11 Pembantu Operator Org/Hari Rp 175,000 Rp 175,000 Rp 175,000

12 Penjaga Siang Org/Hari Rp 60,000 Rp 60,000 Rp 60,000

13 Biaya Pemasangan Instalasi Listrik /Unit Rp 75,000 Rp 75,000 Rp 75,000

14 Biaya Pemasangan Instalasi Air Bersih (Rumah Tangga) /Meteran Rp 1,400,000 Rp 1,400,000 Rp 1,400,000

15 Biaya Pemasangan Instalasi Air Bersih (Kantor) /Meteran Rp 5,000,000 Rp 5,000,000 Rp 5,000,000
16 Biaya Pemasangan Ac / Unit Rp 150,000 Rp 150,000 Rp 150,000

191
TAR HARGA SATUAN BAHAN MATERIAL

HARGA SATUAN ( RP. ) / KECAMATAN

PANGALE Budong2 KET

10 11 12
262,500 275,000

343,000 331,000

143,000 131,000

220,000 137,000

219,000 219,000

356,000 356,000

356,000 356,000

369,000 369,000

375,000 375,000

381,000 381,000

394,000 394,000

396,800 310,500

155,000 144,000

136,000 125,000

192
DAFTAR HARGA SATUAN UPAH KERJA

HARGA SATUAN ( RP. ) / KECAMATAN

BUDONG2 PANGALE KET

7 8 12

Rp 150,000 Rp 150,000

Rp 120,000 Rp 120,000

Rp 120,000 Rp 120,000

Rp 120,000 Rp 120,000

Rp 100,000 Rp 100,000

Rp 80,000 Rp 80,000

Rp 70,000 Rp 70,000

Rp 70,000 Rp 70,000

Rp 80,000 Rp 80,000

Rp 280,000 Rp 280,000

Rp 175,000 Rp 175,000

Rp 60,000 Rp 60,000

Rp 75,000 Rp 75,000

Rp 1,400,000 Rp 1,400,000

Rp 5,000,000 Rp 5,000,000

Rp 150,000 Rp 150,000

193
DAFTAR HARGA BAHAN

No Bahan Satuan Harga

1 2 3 4
l BAHAN PIPA DAN ACESSORIES

A BAHAN GIP / STEEL


1 Pipa Gip Ø 12" ( medium A) Meter Rp 1,483,000.00
Pipa Gip Ø 10" ( medium A) Meter Rp 1,105,000.00
Pipa Gip Ø 8" ( medium A) Meter Rp 871,000.00
Pipa Gip Ø 6" ( medium A) Meter Rp 572,000.00
Pipa Gip Ø 4" ( medium A) Meter Rp 365,000.00
Pipa Gip Ø 3" ( medium A) Meter Rp 265,000.00
Pipa Gip Ø 2" ( medium A) Meter Rp 170,900.00

Pipa GIP Ø 1 " Meter Rp 31,504.00


Pipa GIP Ø 3/4 " Meter Rp 22,500.00
Pipa GIP Ø 1/2 " Meter Rp 20,000.00

2 Bend Gip 90⁰ - Ø 12" Buah Rp 1,052,600.00


Bend Gip 90⁰ - Ø 10" Buah Rp 976,000.00
Bend Gip 90⁰ - Ø 8" Buah Rp 577,000.00
Bend Gip 90⁰ - Ø 6" Buah Rp 178,000.00
Bend Gip 90⁰ - Ø 4" Buah Rp 99,000.00
Bend Gip 90⁰ - Ø 3" Buah Rp 59,000.00
Bend Gip 90⁰ - Ø 2" Buah Rp 38,000.00

3 Ben Gip 45⁰ - Ø 12" Buah Rp 789,500.00


Ben Gip 45⁰ - Ø 10" Buah Rp 732,000.00
Ben Gip 45⁰ - Ø 8" Buah Rp 432,800.00
Ben Gip 45⁰ - Ø 6" Buah Rp 133,500.00
Ben Gip 45⁰ - Ø 4" Buah Rp 74,500.00
Ben Gip 45⁰ - Ø 3" Buah Rp 44,500.00
Ben Gip 45⁰ - Ø 2" Buah Rp 28,500.00

4 Ben Gip 22,5⁰ - Ø 12" Buah Rp 592,500.00


Ben Gip 22,5⁰ - Ø 10" Buah Rp 549,000.00
Ben Gip 22,5⁰ - Ø 8" Buah Rp 324,600.00
Ben Gip 22,5⁰ - Ø 6" Buah Rp 100,500.00
Ben Gip 22,5⁰ - Ø 4" Buah Rp 55,700.00

192
Ben Gip 22,5⁰ - Ø 3" Buah Rp 33,500.00

Ben Gip 22,5⁰ - Ø 2" Buah Rp 21,500.00


5 Tee Steel All Flange Ø (12 x 12 x 12 ) " Buah Rp 7,748,500.00
Tee Steel All Flange Ø (12 x 10 x 12 ) " Buah Rp 7,633,500.00
Tee Steel All Flange Ø (12 x 8 x 12 ) " Buah Rp 7,345,000.00
Tee Steel All Flange Ø (10 x 10 x 10 ) " Buah Rp 5,910,500.00
Tee Steel All Flange Ø (10 x 8 x 10 ) " Buah Rp 4,859,500.00
Tee Steel All Flange Ø (10 x 6 x 10 ) " Buah Rp 4,373,100.00
Tee Steel All Flange Ø (8 x 8 x 8 ) " Buah Rp 3,621,700.00
Tee Steel All Flange Ø (8 x 6 x 8 ) " Buah Rp 3,248,800.00
Tee Steel All Flange Ø (8 x 4 x 8 ) " Buah Rp 2,777,500.00
Tee Steel All Flange Ø (6 x 6 x 6 ) " Buah Rp 2,282,700.00
Tee Steel All Flange Ø (6 x 4 x 6 ) " Buah Rp 2,034,700.00
Tee Steel All Flange Ø (6 x 3 x 6 ) " Buah Rp 1,757,000.00
Tee Steel All Flange Ø (4 x 4 x 4 ) " Buah Rp 1,532,500.00
Tee Steel All Flange Ø (4 x 3 x 4 ) " Buah Rp 1,039,700.00
Tee Steel All Flange Ø (4 x 2 x 4 ) " Buah Rp 672,800.00
Tee Steel All Flange Ø (3 x 3 x 3 ) " Buah Rp 611,600.00
Tee Steel All Flange Ø (3 x 2 x 3 ) " Buah Rp 581,000.00
Tee Steel All Flange Ø (2 x 2 x 2 ) " Buah Rp 512,000.00

6 Valve All Flange Ø 12 " Buah Rp 7,737,500.00


Valve All Flange Ø 10 " Buah Rp 7,094,500.00
Valve All Flange Ø 8 " Buah Rp 5,500,000.00
Valve All Flange Ø 6 " Buah Rp 4,400,000.00
Valve All Flange Ø 4 " Buah Rp 2,400,000.00
Valve All Flange Ø 3 " Buah Rp 1,800,000.00
Valve All Flange Ø 2 " Buah Rp 1,300,000.00

7 Flage Steel Ø 12 " Lengkap Baut Buah Rp 372,500.00


Flage Steel Ø 10 " Lengkap Baut Buah Rp 305,800.00
Flage Steel Ø 8 " Lengkap Baut Buah Rp 254,500.00
Flage Steel Ø 6 " Lengkap Baut Buah Rp 238,600.00
Flage Steel Ø 4 " Lengkap Baut Buah Rp 128,500.00
Flage Steel Ø 3 " Lengkap Baut Buah Rp 104,000.00
Flage Steel Ø 2 " Lengkap Baut Buah Rp 79,600.00

8 Valve Cover Ø 12 " Buah Rp 310,800.00


Valve Cover Ø 10 " Buah Rp 259,900.00
Valve Cover Ø 8 " Buah Rp 197,800.00
Valve Cover Ø 6 " Buah Rp 62,200.00
Valve Cover Ø 4 " Buah Rp 56,500.00

193
9 Stand Valve Ø 12 " Buah Rp 226,500.00
Stand Valve Ø 10 " Buah Rp 226,000.00
Stand Valve Ø 8 " Buah Rp 209,500.00
Stand Valve Ø 6 " Buah Rp 183,500.00
Stand Valve Ø 4 " Buah Rp 165,500.00
Stand Valve Ø 3 " Buah Rp 146,800.00
Stand Valve Ø 2 " Buah Rp 140,700.00

10 Air Valve Ø 25 mm Buah Rp 289,500.00


Air Valve Ø 20 mm Buah Rp 274,500.00
Air Valve Ø 12,55 mm Buah Rp 259,500.00

11 Clamp Sadle Ø 200 x 25 mm Buah Rp 54,900.00


Clamp Sadle Ø 150 x 25 mm Buah Rp 42,700.00
Clamp Sadle Ø 100 x 25 mm Buah Rp 40,500.00
Clamp Sadle Ø 75 x 25 mm Buah Rp 25,500.00

Clamp Sadle Ø 150 x 20 mm Buah Rp 38,900.00


Clamp Sadle Ø 100 x 20 mm Buah Rp 36,500.00
Clamp Sadle Ø 75 x 20 mm Buah Rp 23,000.00
Clamp Sadle Ø 50 x 20 mm Buah Rp 23,000.00

Clamp Sadle Ø 150 x 12,5 mm Buah Rp 35,500.00


Clamp Sadle Ø 100 x 12,5 mm Buah Rp 33,500.00
Clamp Sadle Ø 75 x 12,5 mm Buah Rp 21,000.00
12 Air Ven Ø 3 " Buah Rp 20,000.00
13 Stainer Ø 6 " Buah Rp 963,700.00
Stainer Ø 4 " Buah Rp 847,000.00
Stainer Ø 3 " Buah Rp 731,500.00

14 Tutup Manhole 1,00 x 0, 80 m Buah Rp 787,700.00


Tutup Manhole 0,80 x 0, 80 m Buah Rp 417,000.00
Tutup Manhole 0,80 x 0, 60 m Buah Rp 370,700.00
Tutup Manhole 0,60 x 0,60 m Buah Rp 324,500.00

15 Dresser Joint Ø 12 " Buah Rp 1,039,700.00


Dresser Joint Ø 10 " Buah Rp 978,500.00
Dresser Joint Ø 8 " Buah Rp 504,600.00
Dresser Joint Ø 6 " Buah Rp 302,800.00
Dresser Joint Ø 4 " Buah Rp 174,500.00
Dresser Joint Ø 3 " Buah Rp 137,600.00
Dresser Joint Ø 2 " Buah Rp 101,000.00

194
Meter Induk Ø 6" Buah Rp 9,729,300.00

16 Bar Matahari pada pasangan pipa Ø 12 " Buah Rp 500,500.00


Bar Matahari pada pasangan pipa Ø 10 " Buah Rp 412,500.00
Bar Matahari pada pasangan pipa Ø 8 " Buah Rp 321,600.00
Bar Matahari pada pasangan pipa Ø 6 " Buah Rp 276,500.00
Bar Matahari pada pasangan pipa Ø 4 " Buah Rp 185,400.00
Bar Matahari pada pasangan pipa Ø 3 " Buah Rp 139,000.00
Bar Matahari pada pasangan pipa Ø 2 " Buah Rp 92,700.00

B BAHAN PIPA & RUBER


1 Pipa PVC Ø 12 " ( Bell End SNI S - 12, 5 ) Meter Rp 802,700.00
Pipa PVC Ø 10 " ( Bell End SNI S - 12, 5 ) Meter Rp 501,000.00
Pipa PVC Ø 8 " ( Bell End SNI S - 12, 5 ) Meter Rp 323,100.00
Pipa PVC Ø 6 " ( Bell End SNI S - 12, 5 ) Meter Rp 202,000.00
Pipa PVC Ø 4 " ( Bell End SNI S - 12, 5 ) Meter Rp 184,000.00
Pipa PVC Ø 3 " ( Bell End SNI S - 12, 5 ) Meter Rp 115,500.00
Pipa PVC Ø 2 " ( Bell End SNI S - 12, 5 ) Meter Rp 63,000.00

2 Bell Bend 90⁰ Ø 12 " Buah Rp 3,754,500.00


Bell Bend 90⁰ Ø 10 " Buah Rp 2,168,500.00
Bell Bend 90⁰ Ø 8 " Buah Rp 1,235,900.00
Bell Bend 90⁰ Ø 6 " Buah Rp 686,900.00
Bell Bend 90⁰ Ø 4 " Buah Rp 323,500.00
Bell Bend 90⁰ Ø 3 " Buah Rp 224,800.00
Bell Bend 90⁰ Ø 2 " Buah Rp 133,500.00

Bell Bend 45⁰ Ø 12 " Buah Rp 3,372,000.00


Bell Bend 45⁰ Ø 10 " Buah Rp 1,985,900.00
Bell Bend 45⁰ Ø 8 " Buah Rp 1,060,400.00
Bell Bend 45⁰ Ø 6 " Buah Rp 598,400.00
Bell Bend 45⁰ Ø 4 " Buah Rp 282,400.00
Bell Bend 45⁰ Ø 3 " Buah Rp 198,500.00
Bell Bend 45⁰ Ø 2 " Buah Rp 122,500.00

Bell Bend 22,5⁰ Ø 12 " Buah Rp 2,730,500.00


Bell Bend 22,5⁰ Ø 10 " Buah Rp 1,633,500.00
Bell Bend 22,5⁰ Ø 8 " Buah Rp 886,500.00
Bell Bend 22,5⁰ Ø 6 " Buah Rp 510,000.00
Bell Bend 22,5⁰ Ø 4 " Buah Rp 252,900.00
Bell Bend 22,5⁰ Ø 3 " Buah Rp 175,700.00
Bell Bend 22,5⁰ Ø 2 " Buah Rp 106,900.00

195
Bell Bend 11,5⁰ Ø 12 " Buah Rp 2,267,800.00
Bell Bend 11,5⁰ Ø 10 " Buah Rp 1,379,500.00
Bell Bend 11,5⁰ Ø 8 " Buah Rp 775,400.00
Bell Bend 11,5⁰ Ø 6 " Buah Rp 453,800.00
Bell Bend 11,5⁰ Ø 4 " Buah Rp 234,700.00
Bell Bend 11,5⁰ Ø 3 " Buah Rp 163,500.00
Bell Bend 11,5⁰ Ø 2 " Buah Rp 102,800.00

Bell Bend Repair Ø 12 " Buah Rp 584,500.00


Bell Bend Repair Ø 10 " Buah Rp 365,500.00
Bell Bend Repair Ø 8 " Buah Rp 234,500.00
Bell Bend Repair Ø 6 " Buah Rp 152,000.00
Bell Bend Repair Ø 4 " Buah Rp 57,500.00
Bell Bend Repair Ø 3 " Buah Rp 34,500.00
Bell Bend Repair Ø 2 " Buah Rp 15,000.00

Bell Tee Bell Ø 12" x 12" x 12" Buah Rp 3,725,700.00


Bell Tee Bell Ø 12" x 10" x 12" Buah Rp 3,567,500.00
Bell Tee Bell Ø 12" x 8" x 12" Buah Rp 3,483,900.00
Bell Tee Bell Ø 10" x 10" x 10" Buah Rp 2,610,700.00
Bell Tee Bell Ø 10" x 8" x 10" Buah Rp 2,430,000.00
Bell Tee Bell Ø 10" x 6" x 10" Buah Rp 2,345,700.00
Bell Tee Bell Ø 10" x 4" x 10" Buah Rp 2,062,500.00
Bell Tee Bell Ø 8" x 8" x 8" Buah Rp 1,939,000.00
Bell Tee Bell Ø 8" x 6" x 8" Buah Rp 1,814,500.00
Bell Tee Bell Ø 8" x 4" x 8" Buah Rp 1,772,000.00
Bell Tee Bell Ø 6" x 6" x 6" Buah Rp 1,262,500.00
Bell Tee Bell Ø 6" x 4" x 6" Buah Rp 1,169,700.00
Bell Tee Bell Ø 6" x 3" x 6" Buah Rp 1,103,500.00
Bell Tee Bell Ø 4" x 4" x 4" Buah Rp 531,500.00
Bell Tee Bell Ø 4" x 3" x 4" Buah Rp 508,800.00
Bell Tee Bell Ø 4" x 2" x 4" Buah Rp 501,500.00
Bell Tee Bell Ø 3" x 3" x 3" Buah Rp 393,900.00
Bell Tee Bell Ø 3" x 2" x 3" Buah Rp 371,500.00
Bell Tee Bell Ø 2" x 2" x 2" Buah Rp 296,600.00

Flanged Bell End Ø 12" Lengkap Baut Buah Rp 1,309,000.00


Flanged Bell End Ø 10" Lengkap Baut Buah Rp 998,500.00
Flanged Bell End Ø 8" Lengkap Baut Buah Rp 960,500.00
Flanged Bell End Ø 6" Lengkap Baut Buah Rp 618,500.00
Flanged Bell End Ø 4" Lengkap Baut Buah Rp 349,500.00
Flanged Bell End Ø 3" Lengkap Baut Buah Rp 272,700.00

196
Flanged Bell End Ø 2" Lengkap Baut Buah Rp 198,000.00

5 Flanged Spigot Ø 12" Lengkap Baut Buah Rp 1,159,500.00


Flanged Spigot Ø 10" Lengkap Baut Buah Rp 836,800.00
Flanged Spigot Ø 8" Lengkap Baut Buah Rp 687,600.00
Flanged Spigot Ø 6" Lengkap Baut Buah Rp 485,800.00
Flanged Spigot Ø 4" Lengkap Baut Buah Rp 317,600.00
Flanged Spigot Ø 3" Lengkap Baut Buah Rp 252,700.00
Flanged Spigot Ø 2" Lengkap Baut Buah Rp 183,500.00

6 Bell Reducer Ø 12" x 10" Buah Rp 1,145,500.00


Bell Reducer Ø 10" x8" Buah Rp 784,500.00
Bell Reducer Ø 8" x 6" Buah Rp 485,500.00
Bell Reducer Ø 8" x 4" Buah Rp 187,600.00
Bell Reducer Ø 6" x 4" Buah Rp 251,000.00
Bell Reducer Ø 4" x 3" Buah Rp 167,500.00
Bell Reducer Ø 3" x 2" Buah Rp 89,000.00

7 Bell Cap Ø 8" Buah Rp 416,500.00


Bell Cap Ø 6" Buah Rp 230,600.00
Bell Cap Ø 4" Buah Rp 145,600.00
Bell Cap Ø 3" Buah Rp 77,900.00
Bell Cap Ø 2" Buah Rp 43,500.00

8 Karet Packing Ø 12" Buah Rp 117,700.00


Karet Packing Ø 10" Buah Rp 73,600.00
Karet Packing Ø 8" Buah Rp 47,500.00
Karet Packing Ø 6" Buah Rp 30,700.00
Karet Packing Ø 4" Buah Rp 20,700.00
Karet Packing Ø 3" Buah Rp 17,700.00
Karet Packing Ø 2" Buah Rp 17,700.00

9 Flexibel Joint Ø 12" Buah Rp 4,586,700.00


Flexibel Joint Ø 10" Buah Rp 3,577,700.00
Flexibel Joint Ø 8" Buah Rp 2,660,500.00
Flexibel Joint Ø 6" Buah Rp 1,743,000.00
Flexibel Joint Ø 4" Buah Rp 1,100,800.00
Flexibel Joint Ø 3" Buah Rp 642,500.00
Flexibel Joint Ø 2" Buah Rp 489,500.00

C BAHAN HDPE DAN ACCSESORIES

197
1 Pipa HDPE PE-100 PN 10 Ø 12 " Meter Rp 1,073,100.00
Pipa HDPE PE-100 PN 10 Ø 10 " Meter Rp 674,700.00
Pipa HDPE PE-100 PN 10 Ø 8 " Meter Rp 550,600.00
Pipa HDPE PE-100 PN 10 Ø 6 " Meter Rp 278,100.00
Pipa HDPE PE-100 PN 10 Ø 4 " Meter Rp 133,200.00
Pipa HDPE PE-100 PN 10 Ø 3 " Meter Rp 89,200.00
Pipa HDPE PE-100 PN 10 Ø 2 " Meter Rp 44,000.00

2 Bend 90⁰ HDPE Ø 12 " Buah Rp 1,920,000.00


Bend 90⁰ HDPE Ø 10 " Buah Rp 1,482,000.00
Bend 90⁰ HDPE Ø 8 " Buah Rp 931,400.00
Bend 90⁰ HDPE Ø 6 " Buah Rp 764,000.00
Bend 90⁰ HDPE Ø 4 " Buah Rp 375,900.00
Bend 90⁰ HDPE Ø 3 " Buah Rp 305,900.00
Bend 90⁰ HDPE Ø 2 " Buah Rp 183,000.00

3 Bend 45⁰ HDPE Ø 12 " Buah Rp 1,286,700.00


Bend 45⁰ HDPE Ø 10 " Buah Rp 1,021,200.00
Bend 45⁰ HDPE Ø 8 " Buah Rp 724,200.00
Bend 45⁰ HDPE Ø 6 " Buah Rp 585,200.00
Bend 45⁰ HDPE Ø 4 " Buah Rp 305,600.00
Bend 45⁰ HDPE Ø 3 " Buah Rp 212,400.00
Bend 45⁰ HDPE Ø 2 " Buah Rp 125,800.00

4 Reducer Ø 12 " x 10 " Buah Rp 1,591,600.00


Reducer Ø 10 " x 8 " Buah Rp 990,200.00
Reducer Ø 8 " x 6 " Buah Rp 527,000.00
Reducer Ø 8 " x 4 " Buah Rp 527,000.00
Reducer Ø 6 " x 4 " Buah Rp 361,300.00
Reducer Ø 4 " x 3 " Buah Rp 135,800.00
Reducer Ø 3 " x 2 " Buah Rp 74,200.00
5 Stub Flange HDPE Ø 12 " Buah Rp 1,565,800.00
Stub Flange HDPE Ø 10 " Buah Rp 1,088,600.00
Stub Flange HDPE Ø 8 " Buah Rp 744,800.00
Stub Flange HDPE Ø 6 " Buah Rp 475,300.00
Stub Flange HDPE Ø 4 " Buah Rp 269,600.00
Stub Flange HDPE Ø 3 " Buah Rp 218,100.00
Stub Flange HDPE Ø 2 " Buah Rp 149,300.00

D BAHAN BESI PROFIL"H"


Besi profil "H" (H Beam 100)x 100x6x8 Meter Rp 288,000.00
Besi profil "H" (H Beam 125)x 125x6.5x9 Meter Rp 399,900.00
Besi profil "H" (H Beam 150)x 150x7x11 Meter Rp 528,500.00

198
Besi profil "H" (H Beam 175)x 175x7.5x11 Meter Rp 673,500.00
Besi profil "H" (H Beam 200)x 200x8x12 Meter Rp 837,500.00
Besi profil "H" (H Beam 250)x 250x9x14 Meter Rp 1,215,500.00
Besi profil "H" (H Beam 300)x 300x10x15 Meter Rp 1,577,500.00
Besi profil "H" (H Beam 350)x 350x12x19 Meter Rp 2,480,900.00

E BAHAN KELENGKAPAN HU / KRAN UMUM


1 Tangki HU Kapasitas 2,00 m3 unit Rp 3,150,000.00
Tangki HU Kapasitas 1,50 m3 unit Rp 2,316,500.00
Tangki HU Kapasitas 1,25 m3 unit Rp 1,621,600.00
Tangki HU Kapasitas 1,00 m3 unit Rp 1,158,500.00

2 Mand Meter Ø 1" Buah Rp 55,600.00


Mand Meter Ø 3/4" Buah Rp 47,500.00
Mand Meter Ø 1/2" Buah Rp 39,900.00

3 Double Neple Ø 1" Buah Rp 24,500.00


Double Neple Ø 3/4" Buah Rp 18,000.00
Double Neple Ø 1/2" Buah Rp 14,000.00
4 Sock GIP Ø 1" Buah Rp 22,500.00
Sock GIP Ø 3/4" Buah Rp 16,000.00
Sock GIP Ø 1/2" Buah Rp 14,000.00

5 Knee GIP Ø 1" Buah Rp 25,500.00


Knee GIP Ø 3/4" Buah Rp 19,000.00
Knee GIP Ø 1/2" Buah Rp 16,000.00

6 Tee GIP Ø 1" Buah Rp 34,800.00


Tee GIP Ø 3/4" Buah Rp 22,500.00
Tee GIP Ø 1/2" Buah Rp 19,000.00

7 Stop Kran Ø 1" Buah Rp 136,500.00


Stop Kran Ø 3/4" Buah Rp 115,500.00
Stop Kran Ø 1/2" Buah Rp 84,000.00
Ball Valve Ø 1" Buah Rp 31,600.00
Ball Valve Ø 3/4" Buah Rp 20,900.00
8 Pelampung Ø 3/4" Set Rp 55,600.00
Seal Tape Pipa Dos Rp 92,700.00

ll BAHAN LAINNYA
A BAHAN AGREGAT

199
Pasir Urug mᶟ Rp 130,000.00
Pasir Pasang mᶟ Rp 152,500.00
Pasir Beton mᶟ Rp 155,000.00
Kerikil Sungai / kepala Pasir mᶟ Rp 250,000.00
Pasir batu / kotor mᶟ Rp 165,000.00
batu kali 15/20 mᶟ Rp 269,000.00
koral Beton / Kerikil Pecah 2/3 mᶟ Rp 442,800.00
Batu Pecah 5/7 cm mᶟ Rp 350,000.00
Batu Bata Buah Rp 1,200.00
Portland Cement @ 50 kg Zak Rp 75,000.00
Portland Cement @ 1 kg Kg Rp 1,500.00

B BAHAN BESI / BAJA


Besi Beton Kg Rp 27,900.00
Kawat Beton Kg Rp 37,000.00
Kawat Las Kg Rp 131,500.00
Kawat Roll / Bronjong Rool Rp 1,200,000.00
Tali Sling Ø 1" Meter Rp 113,000.00
Tali Sling Ø 3/4" Meter Rp 237,300.00
Tali Sling Ø 1/2" Meter Rp 237,300.00
Baut Angker 12 mm Buah Rp 750.00
Baja 2xWF 200.125 Buah Rp 88,500.00
Besi Siku 70,70,7 Meter Rp 54,200.00
Besi Siku 60,60,6 Meter Rp 46,400.00
Besi Siku 50,50,5 Meter Rp 41,900.00
Besi Strip 50,5 Meter Rp 33,900.00
Besi Strip 50,4 Meter Rp 29,100.00
Besi Strip 50,3 Meter Rp 27,200.00
paku 2' 5' Kg Rp 25,800.00
baut Mur & Ring 16/15 Buah Rp 5,000.00

C BAHAN KAYU
Plywood / Multiplex 4 mm lembar Rp 80,000.00
Kayu Dolken / Galam Buah Rp 22,600.00
Kayu Borneo (lll) mᶟ Rp 2,110,000.00
Kayu Kelas ll mᶟ Rp 3,367,600.00
kayu ulin mᶟ Rp 10,735,000.00
Kayu Bayam mᶟ Rp 7,910,000.00
D BAHAN KIMIA DAN LAINNYA

200
Cat Tembok Kg Rp 90,000.00
Cat Kilat / Besi Kg Rp 54,400.00
Cat kayu Kg Rp 67,000.00
Minyak cat Liter Rp 57,600.00
Cat Meni Kg Rp 20,500.00
Plamir Tembok Kg Rp 16,400.00
Kaporit Kg Rp 19,800.00
Air Bersih untuk Test & Pencucian Pipa mᶟ Rp 1,800.00

201