Tutup bawah Tutup atas Besi behel 2 Besi behel 1 Lakob Pipa ukuran 5 Pipa ukuran 4 Pipa ukuran 2,5
18'
O-4 Penempelan
Lakob (las)
8' Penyambungan
O-5 Pipa
(las)
3' Pelubangan
O-6 Pasak
(gas cutting)
Pengelasan
5' O-8 Pasak
(las)
8' Penyambungan
O-9 Pipa
(las)
3' Pelubangan
O-10 Pasak
(gas cutting)
5' Pengelasan
O-12 Pasak
(las)
8' Pengelasan
O-14 Tutup atas
(las)
8' Pengelasan
O-16 Tutup bawah
(las)
10'
O-17 Cat
RINGKASAN
WAKTU 5'
KETERANGAN JUMLAH I-9
Quality
(MENIT) control
PEMERIKSAAN 9 21
OPERASI 17 94
TOTAL 26 115