A. Upah
1 Pekerja Org/Hari 69.680,00 Berdasarkan UMR Kab.
2 Tukang Kayu Org/Hari 72.000,00 Pati 2019
3 Tukang Batu Org/Jam 72.000,00
4 Tukang Besi Org/Hari 72.000,00
5 Kepala Tukang Org/Jam 74.000,00
6 Mandor Org/Jam 75.000,00
7 Jaga Malam Org/Hari 69.680,00
8 Fotografer Org/Hari 90.000,00
9 Pembantu fotografer Org/Hari 70.000,00
10 Juru Ukur / Gambar Org/Hari 90.000,00
11 Pembantu Juru Ukur Org/Hari 70.000,00
12 Quantity Org/Hari 90.000,00
13 Mekanik Org/Hari 100.000,00
14 Operator Org/Hari 90.000,00
15 Pembantu Operator Org/Hari 75.000,00
16 Sopir Org/Hari 85.000,00
17 Kernet Org/Hari 70.000,00
B. Bahan
1 Batu Kali / Batu Belah M3 124.372,00
2 Kertas Kalkir Rol 90.000,00
3 Kertas Milimeter Rol 50.000,00
4 Solar Industri (Minyak Solar) Ltr 10.625,00
5 Pelumas Transmisi Ltr 25.000,00
6 Pelumas Masin Ltr 23.000,00
7 Grase Ltr 21.000,00
8 Pasir Pasang M3 113.290,00
9 Semen Zak 66.900,00
Semen @ 50 kg Kg 1.338,00
10 Ember Bh 10.000,00
11 Kotak Adukan Bh 50.000,00
12 Papan tebal 4 Lbr 40.000,00
13 Karung Isi Tanah Bh 12.000,00
14 Kayu Bekisting M3 1.515.000,00
15 Paku Kg 15.200,00
16 Besi Beton Kg 10.050,00
17 Kawat Beton Kg 15.050,00
18 Minyak Bensin Ltr 10.925,00
19 Keranjang Bh 9.000,00
20 Gerobak Sorong Unit 350.000,00
21 Pasir Beton M3 129.257,00
22 Pipa PVC 2" M 12.000,00
23 Pipa Galvanis 3" M 174.000,00
24 Ijuk Kg 15.000,00
25 Split (Batu Pacah) M3 286.579,00
26 Kerikil Cor M3 96.500,00
27 Cat Kg 52.000,00
28 Multplex 18 mm Lbr 125.000,00
29 Tanah Timbun M3 76.549,00
30 Pasir Urug M3 86.549,00
31 Tiang Pancang ∆ 28 cm x 28 cm, Panjang 6 m' M' 130.000,00
32 U-Ditch 60 x 60 x 120 cm, tebal 7 cm Bh 910.000,00
33 Beton Ready Mix K-225 M3 936.000,00
34 Beton Ready Mix K-175 M3 836.000,00
35 Plastik Polythene tebal 125 micron M2 28.000,00
36 Paving Block tebal 6 cm Bh 3.200,00
37 Kansteen 10 x 20 x 50 cm Bh 21.950,00
38 Pagar BRC Hot Dip dia. 8 mm, (120x240 cm) M' 785.000,00
39 Tiang BRC Bh 275.000,00
No. URAIAN Satuan Harga Satuan (Rp) Harga Per Hari
C. Peralatan
1 Excavator Jam 425.308,00
2 Bulldozer Jam 485.246,00
3 Dump Truck Jam 272.680,00
4 Jack Hammer sewa-hari 138.430,00
5 Vibro Roller Jam 298.202,00
6 Concrete Mixer Jam 24.004,00 120.020,00
7 Concrete Vibrator Jam 20.741,00
8 Pompa Air Jam 24.875,00 174.125,00
9 Stamper sewa-hari 25.997,00 129.985,00
I.1 Pengamanan dan Pelaksanaan K3
ANALISA :
HARGA SATUAN PEKERJAAN Rp. : 12.235.608,00 /Ls
HARGA
NO. URAIAN SATUAN KUANTITAS SATUAN JUMLAH
(Rp.) (Rp.)
II. BAHAN
1 Kayu 5/7 Btg 1,000 32.000,00 32.000,00
2 Paku Kg 0,250 15.200,00 3.800,00
III. PERALATAN
1 Theodolite sewa-hari 1,000 150.000,00 150.000,00
2 Water Pass sewa-hari 1,000 100.000,00 100.000,00
ANALISA : LA.03
HARGA SATUAN PEKERJAAN Rp. : 720.758,00 /Buah
HARGA
NO. URAIAN SATUAN KUANTITAS SATUAN JUMLAH
(Rp.) (Rp.)
II. BAHAN
1 Multiplek tebal 18 mm Lbr 1,000 125.000,00 125.000,00
2 Kayu 8/12 Kelas II m3 0,077 1.515.000,00 116.655,00
3 Paku Campuran 5 cm dan 7 cm Kg 1,250 15.200,00 19.000,00
4 Cat Kayu Kg 2,500 52.000,00 130.000,00
III. PERALATAN
HARGA
NO. URAIAN SATUAN KUANTITAS SATUAN JUMLAH
(Rp.) (Rp.)
I. Mobilisasi
1 Excavator Unit 3,000 3.500.000,00 10.500.000,00
2 Bulldozer Unit 1,000 3.500.000,00 3.500.000,00
3 Dump Truck Unit 10,000 500.000,00 5.000.000,00
4 Vibro Compactor Unit 1,000 1.500.000,00 1.500.000,00
5 Concrete Pump Unit 1,000 1.000.000,00 1.000.000,00
6 Concrete Mixer Unit 4,000 150.000,00 600.000,00
7 Concrete Vibrator Unit 3,000 50.000,00 150.000,00
8 Generator Set Unit 1,000 500.000,00 500.000,00
9 Pompa Air Unit 4,000 150.000,00 600.000,00
10 Theodolie Set 1,000 50.000,00 50.000,00
11 Water Pass Set 1,000 50.000,00 50.000,00
12 Total Station Set 1,000 50.000,00 50.000,00
13 Stamper Unit 2,000 150.000,00 300.000,00
14 Water Tank Unit 1,000 500.000,00 500.000,00
15 Bar Cutter Set 1,000 150.000,00 150.000,00
16 Bar Bender Set 1,000 150.000,00 150.000,00
17 Peralatan Lab Tanah Set 1,000 50.000,00 50.000,00
18 Peralatan Lab Beton Set 1,000 50.000,00 50.000,00
II Demobilisasi
1 Demobilisasi Ls 1,000 24.700.000,00 24.700.000,00
ANALISA : D.04
HARGA SATUAN PEKERJAAN Rp. : 66.437.580,00 /Ls
HARGA
NO. URAIAN SATUAN KUANTITAS SATUAN JUMLAH
(Rp.) (Rp.)
II. BAHAN
1 Solar Ltr 42,400 10.625,00 450.500,00
III. PERALATAN
1 Pompa Air diesel 5 KW sewa-hari 1,200 174.125,00 208.950,00
ANALISA :
HARGA SATUAN PEKERJAAN Rp. : 47.797,00 /m3
HARGA
NO. URAIAN SATUAN KUANTITAS SATUAN JUMLAH
(Rp.) (Rp.)
II. BAHAN
sub jumlah II -
III. PERALATAN
ANALISA :
HARGA SATUAN PEKERJAAN Rp. : 25.910,00 /m'
HARGA
NO. URAIAN SATUAN KUANTITAS SATUAN JUMLAH
(Rp.) (Rp.)
II. BAHAN
1 Pipa PVC m' 1,050 12.000,00 12.600,00
2 Ijuk kg 0,100 15.000,00 1.500,00
3 Kerikil m3 0,018 96.500,00 1.737,00
III. PERALATAN
ANALISA : P.01.c
HARGA SATUAN PEKERJAAN Rp. : 696.144,00 /m3
HARGA
NO. URAIAN SATUAN KUANTITAS SATUAN JUMLAH
(Rp.) (Rp.)
II. BAHAN
1 Batu Kali m3 1,200 124.372,00 149.246,40
2 Pasir Pasang m3 0,520 113.290,00 58.910,80
3 Semen PC zak 163,000 1.338,00 218.094,00
sub jumlah II 426.251,20
III. PERALATAN
1 Beton Molen sewa-hari 0,167 120.020,00 20.043,34
ANALISA : P.03.e)
HARGA SATUAN PEKERJAAN Rp. : 64.504,00 /m2
HARGA
NO. URAIAN SATUAN KUANTITAS SATUAN JUMLAH
(Rp.) (Rp.)
II. BAHAN
1 Pasir Pasang m3 0,030 113.290,00 3.398,70
2 Semen PC Kg 7,776 1.338,00 10.404,29
sub jumlah II 13.802,99
III. PERALATAN
HARGA
NO. URAIAN SATUAN KUANTITAS SATUAN JUMLAH
(Rp.) (Rp.)
II. BAHAN
1 Pasir Pasang m3 0,012 113.290,00 1.359,48
2 Semen PC kg 6,340 1.338,00 8.482,92
III. PERALATAN
ANALISA : B.17
HARGA SATUAN PEKERJAAN Rp. : 13.061,00 /kg
HARGA
NO. URAIAN SATUAN KUANTITAS SATUAN JUMLAH
(Rp.) (Rp.)
I. UPAH TENAGA KERJA
1 Pekerja OH 0,700 69.680,00 48.776,00
2 Tukang Besi OH 0,700 72.000,00 50.400,00
3 Kepala Tukang OH 0,070 74.000,00 5.180,00
4 Mandor OH 0,070 75.000,00 5.250,00
II. BAHAN
1 Besi Beton Kg 105,000 10.050,00 1.055.250,00
2 Kawat Beton Kg 1,500 15.050,00 22.575,00
sub jumlah II 1.077.825,00
III. PERALATAN
ANALISA : B.21
HARGA SATUAN PEKERJAAN Rp. : 126.409,00 /m2
HARGA
NO. URAIAN SATUAN KUANTITAS SATUAN JUMLAH
(Rp.) (Rp.)
II. BAHAN
1 Multiplek 18 mm Lbr 0,245 125.000,00 30.625,00
2 Kaso 5/7 cm m3 0,0135 1.515.000,00 20.452,50
3 Paku 5 cm dan 7 cm Kg 0,250 15.200,00 3.800,00
4 Minyak bekisting L 0,200 8.000,00 1.600,00
III. ALAT
ANALISA :
HARGA SATUAN PEKERJAAN Rp. : 21.338,00 /m2
HARGA
NO. URAIAN SATUAN KUANTITAS SATUAN JUMLAH
(Rp.) (Rp.)
II. BAHAN
1 Cat Kg 0,245 52.000,00 12.740,00
2 Kuas Bh 0,2000 5.000,00 1.000,00
III. ALAT
ANALISA : B.13
HARGA SATUAN PEKERJAAN Rp. : 1.172.767,00 /m3
HARGA
NO. URAIAN SATUAN KUANTITAS SATUAN JUMLAH
(Rp.) (Rp.)
I. TENAGA
1 Pekerja OH 1,000 69.680,00 69.680,00
2 Tukang Batu OH 0,250 72.000,00 18.000,00
3 Kepala Tukang OH 0,025 74.000,00 1.850,00
4 Mandor OH 0,100 75.000,00 7.500,00
sub jumlah I 97.030,00
II. BAHAN
1 Campuran Beton Ready Mix K.225 m3 1,0200 936.000,00 954.720,00
III. PERALATAN
1 Pompa dan compeyor beton sewa-hari 0,120 120.020,00 14.402,40
HARGA
NO. URAIAN SATUAN KUANTITAS SATUAN JUMLAH
(Rp.) (Rp.)
I. TENAGA
1 Pekerja OH 1,000 69.680,00 69.680,00
2 Tukang Batu OH 0,250 72.000,00 18.000,00
3 Kepala Tukang OH 0,025 74.000,00 1.850,00
4 Mandor OH 0,100 75.000,00 7.500,00
sub jumlah I 97.030,00
II. BAHAN
1 Beton Ready Mix K.175 (60%) m3 0,6300 836.000,00 526.680,00
2 Batu Belah (40%) m3 0,4800 124.372,00 59.698,56
III. PERALATAN
1 Pompa dan compeyor beton sewa-hari 0,120 120.020,00 14.402,40
ANALISA : B.01
HARGA SATUAN PEKERJAAN Rp. : 706.721,00 /m3
HARGA
NO. URAIAN SATUAN KUANTITAS SATUAN JUMLAH
(Rp.) (Rp.)
I. TENAGA
1 Pekerja OH 1,32300 69.680,00 92.186,64
2 Tukang Batu OH 0,22000 72.000,00 15.840,00
3 Kepala Tukang OH 0,02200 74.000,00 1.628,00
4 Mandor OH 0,13200 75.000,00 9.900,00
sub jumlah I 119.554,64
II. BAHAN
1 PC/Portland Cement Kg 247,000 1.338,00 330.486,00
2 PB / Pasir Beton m3 0,621 129.257,00 80.268,60
3 Kr / Krikil m3 0,740 96.500,00 71.410,00
4 Air L 215,000 50,00 10.750,00
III. PERALATAN
1 Molen sewa-hari 0,250 120.020,00 30.005,00
HARGA
NO. URAIAN SATUAN KUANTITAS SATUAN JUMLAH
(Rp.) (Rp.)
I. TENAGA
1 Pekerja OH 0,57143 69.680,00 39.817,14
2 Tukang Batu OH 0,14286 72.000,00 10.285,71
3 Kepala Tukang OH 0,07143 74.000,00 5.285,71
4 Mandor OH 0,05714 75.000,00 4.285,71
sub jumlah I 59.674,29
II. BAHAN
1 U-Ditch 60 x 60 x 120 cm, tebal 7 cm Unit 1,000 910.000,00 910.000,00
III. PERALATAN
1 Tackel sewa-hari 0,250 75.000,00 18.750,00
ANALISA :
HARGA SATUAN PEKERJAAN Rp. : 148.203,00 /M3
HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN JUMLAH
(Rp.) (Rp.)
A TENAGA KERJA
1 Pekerja OH 0,4000 69.680,00 27.872,00
2 Mandor OH 0,0400 75.000,00 3.000,00
B BAHAN DIPAKAI
1 Pasir Urug m3 1,200 86.549,00 103.858,80
ANALISA :
HARGA SATUAN PEKERJAAN Rp. : 49.382,00 /M2
HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN JUMLAH
(Rp.) (Rp.)
A TENAGA KERJA
1 Pekerja OH 0,1600 69.680,00 11.148,80
2 Tukang tembok/gali OH 0,0320 72.000,00 2.304,00
3 Mandor OH 0,0160 75.000,00 1.200,00
B BAHAN DIPAKAI
1 Plastick Polythene tebal 125 micron m2 1,080 28.000,00 30.240,00
HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN JUMLAH
(Rp.) (Rp.)
A TENAGA KERJA
1 Pekerja OH 0,8300 69.680,00 57.834,40
2 Mandor OH 0,0830 72.000,00 5.976,00
B BAHAN
ANALISA :
HARGA SATUAN PEKERJAAN Rp. : 211.547,00 / m'
HARGA
NO. URAIAN SATUAN KUANTITAS SATUAN JUMLAH
(Rp.) (Rp.)
II. BAHAN
1 Pipa galvanis dia. 3" m' 1,0000 174.000,00 174.000,00
III. PERALATAN
Sub Jumlah III -
Sub Jumlah (I+II+III) 192.316,00
IV. Lain-lain
- Biaya Umum 5 % x Sub Jumlah (I+II+III) 9.615,80
- Keuntungan 5 % x Sub Jumlah (I+II+III) 9.615,80
Sub Jumlah IV 19.231,60
Jumlah Harga (I+II+III+IV) 211.547,60
Harga Satuan Pekerjaan Dibulatkan 211.547,00
JENIS PEKERJAAN : Pasangan Pagar BRC Ø 7 mm, T 1.2 M
ANALISA :
HARGA SATUAN PEKERJAAN Rp. : 947.861,00 /m2
HARGA
NO. URAIAN SATUAN KUANTITAS SATUAN JUMLAH
(Rp.) (Rp.)
II. PERALATAN
ANALISA :
HARGA SATUAN PEKERJAAN Rp. : 144.638,00 /m2
HARGA
NO. URAIAN SATUAN KUANTITAS SATUAN JUMLAH
(Rp.) (Rp.)
II. PERALATAN
1 Pedestrian Roller sewa-hari 0,0125 178.962,00 2.237,03
HARGA
NO. URAIAN SATUAN KUANTITAS SATUAN JUMLAH
(Rp.) (Rp.)
II. PERALATAN
I. ASUMSI
1 Jam kerja efektif per-hari Tk 7,00 Jam
2 Faktor pengembangan bahan Fk 1,20
3 Faktor Tanah Lepas Fk1 1,20
2. ALAT
a. Excavator
Kapasitas Bucket V 0,80 M3
Faktor Bucket Fb 0,85 -
Faktor Efisiensi Alat Fa 0,80 -
Waktu Kerja Alat
- Menggali tanah T1 0,40 menit
- Memindahkan T2 0,20 menit
Waktu siklus : Ts 0,60 menit
Koefisien tenaga :
- Pekerja = (Tk x P) : Qt (L01) 0,0368 Jam
- Mandor = (Tk x M) : Qt (L02) 0,0184 Jam
Jenis Pekerjaan : Timbunan Tanggul Embung
Satuan Pembayaran : M3 Anl : --
I. ASUMSI
1 Jam kerja efektif per-hari Tk 7,00 Jam
2 Faktor pengembangan bahan Fk 1,30
3 Faktor Tanah Lepas Fk1 1,20
2. ALAT
a. Excavator
Kapasitas Bucket V 0,80 M3
Faktor Bucket Fb 0,85 -
Faktor Efisiensi Alat Fa 0,80 -
Waktu Kerja Alat
- Menggali tanah T1 0,30 menit
- Memindahkan T2 0,20 menit
Waktu siklus : Ts 0,50 menit
2. TENAGA
Produksi menentukan : Excavator Q1 65,28 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 456,96 M3
Kebutuhan tenaga :
- Pekerja P 2,00 orang
- Mandor M 1,00 orang
Koefisien tenaga :
- Pekerja = (Tk x P) : Qt (L01) 0,0306 Jam
- Mandor = (Tk x M) : Qt (L02) 0,0153 Jam
Jenis Pekerjaan : Membuang hasil galian dgn jarak buangan 0 s/d 0,50 km dan meratakan
Satuan Pembayaran : M3
I. ASUMSI
1 Jam kerja efektif per-hari Tk 7,00 Jam
2 Faktor pengembangan bahan Fk 1,20
3 Faktor Tanah Lepas Fk1 1,20
4 Jarak Angkut L 0,500 Km
5 Tebal hamparan t 0,00 M
2. ALAT
a. Excavator Standart
Kapasitas Bucket V 0,80 M3
Faktor Bucket Fb 0,90 -
Faktor Efisiensi Alat Fa 0,80 -
Waktu Kerja Alat
- Menggali T1 0,00 menit
- Memindahkan dan memuat ke Dump Truck T2 0,50 menit
Waktu siklus : Ts 0,50 menit
c. Dump Truck
Kapasitas bak V 5,00 M3
Faktor efisiensi alat Fa 0,90
Kecepatan rata-rata bermuatan v1 15,00 Km/jam
Kecepatan rata-rata kosong v2 20,00 Km/jam
Waktu Kerja Alat :
- Waktu tempuh isi = (L : v1) x 60 T1 2,00 Menit
- Waktu tempuh kosong = (L : v2) x 60 T2 1,50 Menit
- Waktu muat = (V : Q1) x 60 T3 4,34 Menit
- Lain-lain T4 0,40 Menit
Waktu Siklus = T1 + T2 + T3 + T4 Ts3 8,24 Menit
Kapasitas Produksi Alat = ( V x Fa x 60 ) / (Ts3 x Fk) Q3 36,41 M3/Jam
Koefisien Alat = 1/ Q3 0,0275 Jam
3. TENAGA
Produksi menentukan : Excavator Q1 69,12 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 483,84 M3
Kebutuhan tenaga :
- Pekerja P 2,00 orang
- Mandor M 1,00 orang
Koefisien tenaga :
- Pekerja = (Tk x P) : Qt (L01) 0,0289 Jam
- Mandor = (Tk x M) : Qt (L02) 0,0145 Jam
Jenis Pekerjaan : Membuang hasil galian dgn jarak buangan 0,50 s/d 1,00 km dan meratakan
Satuan Pembayaran : M3
I. ASUMSI
1 Jam kerja efektif per-hari Tk 7,00 Jam
2 Faktor pengembangan bahan Fk 1,20
3 Faktor Tanah Lepas Fk1 1,20
4 Jarak Angkut L 0,750 Km
5 Tebal hamparan t 0,00 M
2. ALAT
a. Excavator Standart
Kapasitas Bucket V 0,80 M3
Faktor Bucket Fb 0,90 -
Faktor Efisiensi Alat Fa 0,80 -
Waktu Kerja Alat
- Menggali T1 0,00 menit
- Memindahkan dan memuat ke Dump Truck T2 0,50 menit
Waktu siklus : Ts 0,50 menit
c. Dump Truck
Kapasitas bak V 5,00 M3
Faktor efisiensi alat Fa 0,90
Kecepatan rata-rata bermuatan v1 15,00 Km/jam
Kecepatan rata-rata kosong v2 20,00 Km/jam
Waktu Kerja Alat :
- Waktu tempuh isi = (L : v1) x 60 T1 3,00 Menit
- Waktu tempuh kosong = (L : v2) x 60 T2 2,25 Menit
- Waktu muat = (V : Q1) x 60 T3 4,34 Menit
- Lain-lain T4 0,40 Menit
Waktu Siklus = T1 + T2 + T3 + T4 Ts3 9,99 Menit
Kapasitas Produksi Alat = ( V x Fa x 60 ) / (Ts3 x Fk) Q3 30,03 M3/Jam
Koefisien Alat = 1/ Q3 0,0333 Jam
3. TENAGA
Produksi menentukan : Excavator Q1 69,12 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 483,84 M3
Kebutuhan tenaga :
- Pekerja P 2,00 orang
- Mandor M 1,00 orang
Koefisien tenaga :
- Pekerja = (Tk x P) : Qt (L01) 0,0289 Jam
- Mandor = (Tk x M) : Qt (L02) 0,0145 Jam
Jenis Pekerjaan : Membuang hasil galian dgn jarak buangan 1,00 s/d 3,00 km dan meratakan
Satuan Pembayaran : M3
I. ASUMSI
1 Jam kerja efektif per-hari Tk 7,00 Jam
2 Faktor pengembangan bahan Fk 1,20
3 Faktor Tanah Lepas Fk1 1,20
4 Jarak Angkut L 2,000 Km
5 Tebal hamparan t 0,00 M
2. ALAT
a. Excavator Standart
Kapasitas Bucket V 0,80 M3
Faktor Bucket Fb 0,90 -
Faktor Efisiensi Alat Fa 0,80 -
Waktu Kerja Alat
- Menggali T1 0,00 menit
- Memindahkan dan memuat ke Dump Truck T2 0,50 menit
Waktu siklus : Ts 0,50 menit
c. Dump Truck
Kapasitas bak V 5,00 M3
Faktor efisiensi alat Fa 0,90
Kecepatan rata-rata bermuatan v1 15,00 Km/jam
Kecepatan rata-rata kosong v2 20,00 Km/jam
Waktu Kerja Alat :
- Waktu tempuh isi = (L : v1) x 60 T1 8,00 Menit
- Waktu tempuh kosong = (L : v2) x 60 T2 6,00 Menit
- Waktu muat = (V : Q1) x 60 T3 4,34 Menit
- Lain-lain T4 0,40 Menit
Waktu Siklus = T1 + T2 + T3 + T4 Ts3 18,74 Menit
Kapasitas Produksi Alat = ( V x Fa x 60 ) / (Ts3 x Fk) Q3 16,01 M3/Jam
Koefisien Alat = 1/ Q3 0,0625 Jam
3. TENAGA
Produksi menentukan : Excavator Q1 69,12 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 483,84 M3
Kebutuhan tenaga :
- Pekerja P 2,00 orang
- Mandor M 1,00 orang
Koefisien tenaga :
- Pekerja = (Tk x P) : Qt (L01) 0,0289 Jam
- Mandor = (Tk x M) : Qt (L02) 0,0145 Jam
Jenis Pekerjaan : Pengadaan dan pemancangan tiang pancang ∆ 28 cm x 28 cm panjang 6 m'
Satuan Pembayaran : M'
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Jam kerja efektif per-hari Tk 7,00 Jam
3 Panjang Tiang Pancang P 6,00 M'
2. ALAT
a. ALAT
Tripod + Hammer
Kapasitas Alat V 1,00 Titik
Faktor Efisiensi Alat Fa 0,80 -
Waktu kerja Alat :
- Waktu menaikan T1 4,00 menit
- Waktu penggeseran dan penyetelan T2 3,00 menit
- Waktu pemancangan T3 5,00 menit
Waktu Siklus : T1 + T2 + T3 Ts 12,00 menit
Kapasitas Produksi
V x P x Fa x 60 Q 24,00 m'/Jam
Ts
Koefisiensi alat 1:Q 0,0417 Jam
3. TENAGA
Produksi menentukan : Tripod + Hammer Q1 24,00 M'/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 168,00 M'
Kebutuhan tenaga :
- Pekerja P 4,00 orang
- Mandor M 1,00 orang
- Tukang T 3,00 orang
- Kepala Tukang KT 2,00 orang
Koefisien tenaga :
- Pekerja = (Tk x P) : Qt (L01) 0,1667 Jam
- Mandor = (Tk x M) : Qt (L02) 0,0417 Jam
- Tukang = (Tk x T) : Qt (L03) 0,1250 Jam
- Kepala Tukang = (Tk x KT) : Qt (L04) 0,0833 Jam