Anda di halaman 1dari 7

Pengeluaran SPPD Sorong 15,167,400.

00
4-Apr-21 5-Apr-21 6-Apr-21 7-Apr-21 8-Apr-21
Tiket Berangkat 4,000,000.00
Hotel 400,000.00 550,000.00 550,000.00 550,000.00 550,000.00
Mobil
Makan
TOTAL 7,150,000.00
9-Apr-21 10-Apr-21 11-Apr-21 12-Apr-21 13-Apr-21

550,000.00
kontrol biaya
No Komponen biaya Rp/hari Junlah Hari TOTAL
KDM
1 Transportasi - v
Pesawat
Mobil 9.00
2 Uang Saku -
Jaya 50,000.00 9.00 450,000.00
Dewa 50,000.00 9.00 450,000.00
3 Konsumsi 200,000.00 - v
4 Cuci Pakaian 50,000.00 9.00 450,000.00 v
5 Penginapan 400,000.00 9.00 3,600,000.00 v
6 Upah Kerja -
Jaya 487,000.00 9.00 4,383,000.00
Dewa
9,333,000.00
kontrol biaya In 50,616,280.00
Keterangan
ASTEK Out 30,066,400.00
7,582,400.00
3,520,000.00
550,000.00
v 2,200,000.00
5,500,000.00
5,357,000.00
5,357,000.00

v
Trasnport (Estimasi)
Penginapan 11 hari (tgl 6-16 Mei)
Laundry
Makan Siang&Malam (11 Hari)
Transportasi Hotel ke Unit
Pak Jaya
Pak Dewa
In 50,616,280.00 s.d tgl 11 April 2021 PR akan dibuat s.d 16 April
Out 28,566,585.00
6,077,201.00 Trasnport berangkat KDM
4,162,384.00 Trasnport pulang KDM
3,520,000.00 Penginapan 11 hari (tgl 6-16 Mei) KDM
550,000.00 Laundry Uang Saku ke astek
2,200,000.00 Makan Siang&Malam (11 Hari) Uang Saku ke astek
4,500,000.00 Transportasi Hotel ke Unit 9 Hari (sewa mobil) KDM
5,357,000.00 Pak Jaya KDM ke PT BUS
2,200,000.00 Pak Dewa KDM

Margin 22,049,695.00
B 128 Rp/kWh
D 28 Rp/kWh

Estimasi Produksi
CF 80%
Jumlah uni 5

Anda mungkin juga menyukai