No. D E S C R I P T I O N Qty Unit ( Rp ) ( Rp ) A. PEKERJAAN PERSIAPAN 1 Local Permit 1.00 Ls 20,000,000 20,000,000 2 Pek. Mob dan Demobilisasi Alat dan Pekerja 1.00 Ls 70,000,000 70,000,000 3 Pek. Listrik dan Air Kerja 1.00 Ls 40,000,000 40,000,000 4 Pek. Administrasi, Dokumentasi 1.00 Ls 7,000,000 7,000,000 5 Pek. Rental Alat Berat - - Crane 30T (2 Unit) 1.00 Ls 400,000,000 400,000,000 - Jack Hammer 1.00 Ls 5,700,000 5,700,000 Sub Total A 542,700,000 B. PEKERJAAN PEMBONGAKARAN STEEL STRUCTURE, ROOFING & BRICK WALL 1 Pek. Bongkar Atap 7,830.00 m2 25,000 195,750,000 2 Pek. Bongkar Sagrod, bracing & Purlin 120,968.27 Kg 1,900 229,839,705 3 Pek. Bongkar Talang 324.00 m; 25,000 8,100,000 4 Pek. Bongkar Brick Wall 8,236.80 m2 22,000 181,209,600 5 Pek. Bongkar Rafter, Kolom, Tie Beam & Canopy 139,080.80 kg 1,900 264,253,520 6 Pek. Biaya Handling (penyusunan bongkaran disusun berdasakan keputusan direksi) 260,049.07 Kg 400.00 104,019,626 7 Pek. Bongkar Pintu Besi (4x5m2) 3.00 Unit 2,250,000 6,750,000 8 Pek Bongkar canopy area loading dock 1.00 Ls 28,080,000 28,080,000 Sub Total B 1,018,002,451 C. PEKERJAAN PEMBONGAKARAN STEEL STRUCTURE, (Area Mezanin) 1 Pekerjaan Bongkar Mezanin 1.00 ls 105,701,408 105,701,408 Sub Total C 105,701,408 D. PEKERJAAN PEMBONGAKARAN GUDANG KECIL (DISAMPING GUDANG INDUK) 1 Pek. Bongkar gudang kecil (disamping gudang induk) dan bekas kantin 1.00 Ls 58,610,188 58,610,188 Sub Total D 58,610,188 TOTAL BIAYA 1,725,014,047