REKAPITULASI

RENCANA ANGGARAN BIAYA (RAB)

PROYEK : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN EMPAT LAWANG
KEGIATAN : REHABILTASI JARINGAN IRIGASI D.I AIR BETUNG BESAR
LOKASI KEGIATAN : DESA PADANG TEPONG, KECAMATAN ULU MUSI
TAHUN ANGGARAN : 2021

NO URAIAN PEKERJAAN JUMLAH

A PEKERJAAN PENDAHULUAN 22,000,000.00


B PEKERJAAN JARINGAN IRIGASI
I PEKERJAAN TANAH GALIAN 47,131,644.71
II PEKERJAAN SALURAN 1,749,489,633.96
III PEMBERSIHAN AKHIR 7,500,000.00

JUMLAH 1,826,121,278.67
PPN 10 % 182,612,127.87
JUMLAH + PPN 10 % 2,008,733,406.54
PEMBULATAN 2,008,733,000.00

TERBILANG : Dua Milyar Seratus Delapan Puluh Delapan Juta Delapan Ratus Delapan Puluh Delapan Ribu Rupiah

Palembang, 29 Maret 2021


Penawar
CV. PURWA DAYA SEJAHTERA

EBING IRAWAN
Direktur
RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN EMPAT LAWANG
PEKERJAAN : REHABILTASI JARINGAN IRIGASI D.I AIR BETUNG BESAR
LOKASI KEGIATAN : DESA PADANG TEPONG, KECAMATAN ULU MUSI
TAHUN ANGGARAN : 2021

VOLUME
NO URAIAN PEKERJAAN SAT HARGA SATUAN JUMLAH
PEK.

A PEKERJAAN PENDAHULUAN
1 Pekerjaan Pembersihan Lokasi 1.00 Ls 2,500,000.00 2,500,000.00
2 Pekerjaan Pengukuran dan Pasang Bowplank 1.00 Ls 4,000,000.00 4,000,000.00
3 Pekerjaan Pasang Papan Nama Kegiatan 1.00 Ls 500,000.00 500,000.00
4 Sewa barak / Bedeng Kerja 1.00 Ls 5,500,000.00 5,500,000.00
5 Kelengkapan K3 1.00 Ls 4,500,000.00 4,500,000.00
6 Pekerjaan Mobilisasi / Demobilisasi 1.00 Ls 5,000,000.00 5,000,000.00
SUB JUMLAH 22,000,000.00
B PEKERJAAN JARINGAN IRIGASI
I PEKERJAAN TANAH GALIAN
1 Pekerjaan Galian Tanah 519.60 M3 81,650.00 42,425,340.00
2 Pekerjaan Urugan Tanah Bekas Galian 173.20 M3 27,172.66 4,706,304.71
SUB JUMLAH 47,131,644.71
II PEKERJAAN SALURAN
1 Pekerjaan Dinding Batu Kali 1 : 3 779.40 M3 1,309,821.25 1,020,874,682.25
2 Pekerjaan Pasangan Pondasi Batu Kali 1 : 3 194.85 M3 1,309,821.25 255,218,670.56
3 Pekerjaan Pasangan Lantai Batu Kali 1 : 3 162.38 M3 1,309,821.25 212,682,225.47
4 Pekerjaan Plesteran Kepala ad 1 : 2 3,427.50 M2 76,065.37 260,714,055.68
SUB JUMLAH 1,749,489,633.96
III PEMBERSIHAN AKHIR
1 Dokumentasi dan Pelaporan Akhir 1.00 Ls 4,500,000.00 4,500,000.00
2 Pembersihan Akhir 1.00 Ls 3,000,000.00 3,000,000.00
SUB JUMLAH 7,500,000.00

Palembang, 29 Maret 2021


Penawar
CV. PURWA DAYA SEJAHTERA

EBING IRAWAN
Direktur
ANALISA HARGA SATUAN BAHAN DAN UPAH

HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFESIEN SATUAN HARGA
(Rp) (Rp)

Galian 1 m3 Tanah Biasa Sedalam 1 Meter


A TENAGA
Pekerja L.01 OH 0.750 90,000.00 67,500.00
Mandor L.04 OH 0.025 140,000.00 3,500.00
JUMLAH TENAGA KERJA 71,000.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 71,000.00
E Overhead & Profit 15 % x D 10,650.00
F Harga Satuan Pekerjaan (D+E) 81,650.00

Urugan 1 m3 Dengan Pasir Urug


A TENAGA
Pekerja L.01 OH 0.500 90,000.00 45,000.00
Mandor L.04 OH 0.010 140,000.00 1,400.00
JUMLAH TENAGA KERJA 46,400.00
B BAHAN
Pasir Urug 1.200 200,000.00 240,000.00
JUMLAH HARGA BAHAN 240,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 286,400.00
E Overhead & Profit 15 % x D 42,960.00
F Harga Satuan Pekerjaan (D+E) 329,360.00

Urugan Kembali 1 m3 (1/3 dari Koefesien Galian)


A TENAGA
Pekerja L.01 OH 0.250 90,000.00 22,500.00
Mandor L.04 OH 0.008 140,000.00 1,128.40
JUMLAH TENAGA KERJA 23,628.40
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 23,628.40
E Overhead & Profit 15 % x D 3,544.26
F Harga Satuan Pekerjaan (D+E) 27,172.66

Pemasangan Batu Kali 1 m3 Campuran 1 PC : 3 Ps


A TENAGA
Pekerja L.01 OH 1.500 90,000.00 135,000.00
Tukang Batu L.02 OH 0.750 110,000.00 82,500.00
Kepala Tukang L.03 OH 0.075 125,000.00 9,375.00
Mandor L.04 OH 0.075 140,000.00 10,500.00
JUMLAH TENAGA KERJA 237,375.00
B BAHAN
Batu Gunung / Batu Belah m3 1.200 420,000.00 504,000.00
Semen Portland Kg 202.000 1,200.00 242,400.00
Pasir Pasang m3 0.485 320,000.00 155,200.00
JUMLAH HARGA BAHAN 901,600.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,138,975.00
E Overhead & Profit 15 % x D 170,846.25
F Harga Satuan Pekerjaan (D+E) 1,309,821.25

Pemasangan 1 m2 plesteran 1 SP : 2 Ps tebal 15mm.

A TENAGA
Pekerja L.01 OH 0.300 90,000.00 Rp 27,000.00
Tukang Batu L.03 OH 0.150 110,000.00 Rp 16,500.00
Kepala Tukang L.03 OH 0.015 125,000.00 Rp 1,875.00
Mandor L.04 OH 0.015 140,000.00 Rp 2,100.00
JUMLAH TENAGA KERJA 47,475.00
B BAHAN
Semen Portland Kg 10.224 1,200.00 12,268.80
Pasir Pasang m3 0.020 320,000.00 6,400.00
JUMLAH HARGA BAHAN 18,668.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 66,143.80
E Overhead & Profit 15 % x D 9,921.57
F Harga Satuan Pekerjaan (D+E) 76,065.37

Palembang, 29 Maret 2021


Penawar
CV. PURWA DAYA SEJAHTERA

EBING IRAWAN
Direktur
DAFTAR HARGA SATUAN UPAH DAN BAHAN

HARGA SATUAN
NO URAIAN UPAH DAN BAHAN SATUAN KETERANGAN
(Rp)

1 2 4 5 6
I Upah Tenaga
1 Pekerja tdk Terlatih 75,000.00 Org/Hari
2 Pekerja Terlatih 90,000.00 Org/Hari
3 Tukang 110,000.00 Org/Hari
4 Kepala Tukang 125,000.00 Org/Hari
5 Mandor 140,000.00 Org/Hari
II Uraian Bahan Umum
1 Ampelas 11,750.00 Lbr
2 Air Adukan 60.00 Liter
3 Batu Belah 420,000.00 M3
4 Baut/Paku Genteng Metal 69,000.00 Kg
5 Besi beton polos 18,850.00 Kg
6 Besi Hollow 2x4 cm 6,666.67 M'
7 Cat dasar 43,200.00 Kg
8 Cat menie 40,500.00 Kg
9 Cat penutup 60,500.00 Kg
10 Cat Aquaproof 87,200.00 Kg
11 Closet Duduk 2,995,000.00 Unit
12 Closet Jongkok 599,500.00 Unit
13 Daun Jendela Aluminium +Kaca 5 MM 798,400.00 Bh
14 Door Closer 149,200.00 Bh
15 Engsel jendela 23,500.00 Bh
16 Engsel pintu 32,500.00 Bh
17 Formika Uk. 122x244 CM 231,200.00 Lembar
18 Flush Bolt (Grendel Pintu) 15,750.00 Bh
19 Floor Drain 109,600.00 Bh
20 Genteng metal 68,950.00 Kpg
21 Grendel Jendela 14,750.00 Bh
22 Grendel Pintu 14,975.00 Bh
23 Gypsum Board 9 MM 142,750.00 Lbr
24 Handel Jendela 9,450.00 Bh
25 Kaca tebal 5 mm 226,750.00 M2
26 Kaca Clear Tempered 8 MM 780,000.00 M2
27 Kait Angin 18,750.00 Bh
28 Kalsiboard 94,500.00 Lembar
29 Kawat Beton 28,750.00 Kg
30 Kawat Seng Polos 33,040.00 Kg
31 Kayu Dolken φ (8-10) cm, P 4 m 13,500.00 Btg
32 Kayu Gelam Dia 10-12 CM 13,000.00 Btg
33 Kayu kelas II 4,750,000.00 M3
34 Kayu kelas III 3,850,000.00 M3
35 Kayu Kelas IV 2,800,000.00 M3
36 Kerikil 450,000.00 M3
37 Keramik Dinding 20/25 67,150.00 Ktk
38 Keramik Lantai 40/40 motif mutu B 16,000.00 Bh
39 Koral Beton 1,050,000.00 M3
40 Kuas 13,000.00 Bh
41 Kunci Tanam 2 Slag Mutu Baik 297,500.00 Unit
42 Kuda-Kuda & Rangka Atap Baja Ringan 210,000.00 M2
HARGA SATUAN
NO URAIAN UPAH DAN BAHAN SATUAN KETERANGAN
(Rp)

1 2 4 5 6
43 Kran Air 1/2 Inch 63,500.00 Unit
HARGA SATUAN
NO URAIAN UPAH DAN BAHAN SATUAN KETERANGAN
(Rp)

1 2 4 5 6
44 Lem Kayu 23,625.00 Kg
45 List Gipsum Besar 24,000.00 M'
46 List PVC panel 57,600.00 M
47 List karet 3,937.50 M'
48 Minyak bekisting 41,565.00 Liter
49 Mur/paku Genteng Metal 69,300.00 Kg
50 Nok genteng metal 54,250.00 Bh
51 Paku 28,800.00 Kg
52 Paku 1 cm - 2,5 cm 20,000.00 Kg
53 Paku 10 cm 28,800.00 Kg
54 Paku 5 cm – 12 cm 29,920.00 Kg
55 Paku 5 dan 7 cm 25,700.00 Kg
56 Paku Sekrup 26,150.00 Kg
57 Papan kayu kelas II atau III 4,150,000.00 M3
58 Pasir Beton 320,000.00 M3
59 Pasir pasang 320,000.00 M3
60 Pasir Urug 200,000.00 M3
61 Pengencer 13,600.00 Kg
62 Plamuur Tembok 152,500.00 GLN
63 Plamuur Kayu 48,800.00 Kg
64 Plint keramik 4,750.00 Bh
65 Plywood 5 mm 111,250.00 Lbr
66 Plywood 9 mm 151,000.00 Lbr
67 Profil alluminium 200,000.00 M'
68 PVC Panel 56,000.00 Lbr
69 Pipa PVC 4” Mutu B 287,500.00 Btg
70 Pipa PVC 2” Mutu A 96,700.00 Btg
71 Pipa PVC 3/4” Mutu A 39,000.00 Btg
72 Pipa PVC 1/2” Mutu A 35,000.00 Btg
73 Propil Pintu alluminium 172,500.00 M'
74 Pull Handle 216,000.00 Unit
75 Ramset/Dina bolt 4,800.00 Bh
76 Rangka Baja 210,000.00 M2
77 Sealant 43,200.00 Kg
78 Semen Portland 60,000.00 ZAK
79 Semen warna 26,250.00 Kg
80 Seng gelombang 12,000.00 kk
81 Seng plat lebar 45/44 cm 35,200.00 m1
82 Seng plat lebar 90 cm 51,000.00 m1
83 Sealant 43,200.00 Tube
84 Seal Tape 6,400.00 Bh
85 Skrup fixer 1,815.00 Bh
86 Tanah Timbunan 105,000.00 M3
87 Teakwood 3 mm 90 x 220 cm 82,000.00 Lbr
88 Tangki Air 1000 Liter 1,997,500.00 Unit
89 Ubin Granite 60x60 419,000.00 M2
90 Keramik 40x40 CM 84,000.00 Ktk
BASIS DATA PERHITUNGAN VOLUME
DIMENSI LUAS-VOL
NO URAIAN PEKERJAAN JML KLL VOLUME SAT
P L T KOTOR TOTAL

1 Kusen Bouvenlight
- Kusen Kayu 2.40 0.22 - 2.00 1.06 1.06 5.27
RUMAH POMPA

- Panel Kaca - - - 2.00 -


2 Kusen Pintu Eksterior
- Kusen Kayu 4.40 0.24 - 2.00 2.11 4.21
- Teralis Besi 0.70 1.50 - 2.00 2.10
3 Kusen Pintu Interior
- Kusen Kayu
- Panel Kayu

1 Kusen Ventilasi teralis


RMH GENSET

- Kusen Kayu 4.40 0.22 - 5.00 4.84 10.09 15.08


- Teralis 1.50 0.70 - 5.00 5.25
2 Kusen Pintu Eksterior
- Kusen Kayu 5.80 0.24 - 1.00 1.39 4.99
- Panel Kayu 2.00 1.80 - 1.00 3.60
DIMENSI LUAS-VOL
NO URAIAN PEKERJAAN JML KLL VOLUME SAT
P L T KOTOR TOTAL
DIMENSI LUAS-VOL
NO URAIAN PEKERJAAN JML KLL VOLUME SAT
P L T KOTOR TOTAL
JADWAL WAKTU PELAKSANAAN PEKERJAAN

KEGIATAN : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN EMPAT LAWANG
PEKERJAAN : REHABILTASI JARINGAN IRIGASI D.I AIR BETUNG BESAR
LOKASI KEGIATAN : DESA PADANG TEPONG, KECAMATAN ULU MUSI
TAHUN ANGGARAN : 2021

Pelaksanaan Masa Pemeliharaan


Bulan Ke-1 Bulan Ke - 2 Bulan Ke - 3 Bulan Ke - 4 Bulan Ke :
No. Uraian Pekerjaan Volume Bobot Ket
Minggu ke .... Minggu ke .... Minggu ke .... Minggu ke ....
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 5 6 1 2 3 4 5 6

100%
A PEKERJAAN PENDAHULUAN 1.00 1.20 0.40 0.40 0.40

B PEKERJAAN JARINGAN IRIGASI

I PEKERJAAN TANAH GALIAN 1.00 2.58 0.43 0.43 0.43 0.43 0.43 0.43 50%

II PEKERJAAN SALURAN 1.00 95.80 6.84 6.84 6.84 6.84 6.84 6.84 6.84 6.84 6.84 6.84 6.84 6.84 6.84 6.84

III PEMBERSIHAN AKHIR 1.00 0.41 0.08 0.08 0.08 0.08 0.08
0%

MASA PELAKSANAAN 90 (HARI KALENDER)


Rencana Kemajuan Pekerjaan (%) 100.000 0.40 0.91 7.67 7.27 7.27 7.27 7.36 6.84 6.84 6.84 6.84 6.93 6.84 6.84 6.84 6.84 0.08 0.08
Rencana Kemajuan Pekerjaan Komulatif (%) 0.40 1.32 8.99 16.26 23.54 30.81 38.17 45.01 51.85 58.69 65.54 72.46 79.31 86.15 92.99 99.84 99.92 100.00
Catatan :
- 1 minggu : 7 hari
- Pelaksanaan 120 hari
Palembang, 29 Maret 2021
Penawar
CV. PURWA DAYA SEJAHTERA

EBING IRAWAN
Direktur
FORMULIR REKAPITULASI PERHITUNGAN TINGKAT KOMPONEN DALAM NEGERI (TKDN)

KEGIATAN : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN EMPAT LAWANG
PEKERJAAN : REHABILTASI JARINGAN IRIGASI D.I AIR BETUNG BESAR
LOKASI KEGIATAN : DESA PADANG TEPONG, KECAMATAN ULU MUSI
TAHUN ANGGARAN : 2021

Nilai Gabungan Barang/Jasa (Rp) TKDN

Uraian Pekerjaan
KDN KLN Total Barang/ Jasa Gabungan

(1) (2) (3) (4) (6) (7)


Barang
I. Material Langsung (Bahan baku) 1,506,550,054.90 - 1,506,550,054.90 75.00 75.00

II. Peralatan (Barang Jadi) 140,611,338.46 - 140,611,338.46 7.00 7.00


A. Sub Total Barang 1,647,161,393.36 - 1,647,161,393.36 82.00 82.00
Jasa
III. Manajemen Proyek dan Perekayasaan 70,305,669.23 70,305,669.23 3.50 3.50

IV. Alat Kerja / Fasilitas Kerja 50,218,335.16 - 50,218,335.16 2.50 2.50

V. Konstruksi dan Fabrikasi 40,174,668.13 - 40,174,668.13 2.00 2.00

VI. Jasa Umum 200,873,340.65 - 200,873,340.65 10.00 10.00


B. Sub Total 361,572,013.18 - 361,572,013.18 18.00 18.00

C. TOTAL Biaya (A + B) 2,008,733,406.54 - 2,008,733,406.54 100.00 100.00


Formulasi perhitungan:
Nilai Barang Total (4A) - Nilai Barang Luar Negeri (3A)
Nilai Gabungan Barang dan Jasa (4C)
% TKDN (Gabungan Barang dan Jasa).
= +

Nilai Jasa Total(4b) - Nilai Jasa Luar Negeri (3B)


Nilai Gabungan Barang dan Jasa (4C)
1,647,161,393.36 361,572,013.18
= +
2,008,733,406.54 2,008,733,406.54 Palembang, 29 Maret 2021
Penawar
= 82.00% + 18.00% CV. PURWA DAYA SEJAHTERA

= 100.00%

EBING IRAWAN
Direktur
DAFTAR PEKERJAAN YANG DISUBKONTRAKAN

KEGIATAN : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN EMPAT LAWANG
PEKERJAAN : REHABILTASI JARINGAN IRIGASI D.I AIR BETUNG BESAR
LOKASI KEGIATAN : DESA PADANG TEPONG, KECAMATAN ULU MUSI
TAHUN ANGGARAN : 2021

Harga Satuan Jumlah Harga


No. Uraian Pekerjaan Satuan Volume
(Rp) (Rp)

TIDAK DISUBKONTRAKAN

Palembang, 29 Maret 2021


Penawar
CV. PURWA DAYA SEJAHTERA

EBING IRAWAN
Direktur
SPESIFIKASI TEKNIS PEKERJAAN
KEGIATAN : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN EMPAT LAWANG
PEKERJAAN : REHABILTASI JARINGAN IRIGASI D.I AIR BETUNG BESAR
LOKASI KEGIATAN : DESA PADANG TEPONG, KECAMATAN ULU MUSI
TAHUN ANGGARAN : 2021

Harga Satuan Jumlah Harga


No. Uraian Pekerjaan
(Rp) (Rp)

SPESIFIKASI TEKNIS PEKERJAAN SESUAI DENGAN DOKUMEN

Palembang, 29 Maret 2021


Penawar
CV. PURWA DAYA SEJAHTERA

EBING IRAWAN
Direktur