Anda di halaman 1dari 36

DAFTAR GAMBAR

DAFTAR GAMBAR DAFTAR GAMBAR DAFTAR GAMBAR

Nama Gambar No. Gambar Nama Gambar No. Gambar Nama Gambar No. Gambar

Daftar Gambar 1 Denah 15 Detail Kolom K1 27


Denah Lantai 1 2 Pembalokan Atap Detail HBK 28
Denah Lantai 2 3 Detail Tangga 1 16 Detail Pondasi 29
Denah Lantai 3 4 Detail Tangga 2 17 Portal Memanjang 30
Pot. Melintang 5 Denah Penulangan 18 Portal Melintang 31
Pot. Memanjang 6 Pelat Lt.2 BBS 33
Tampak Utara 7 Denah Penulangan 19 BBS 2 34
Pelat Lt.3
Tampak Timur 8 BBS 3 35
Denah Penulangan 20
Tampak Selatan 9 Volume 36
Atap
Tampak Barat 10 Tabel Balok 37
Detail pelat 1 21
Potongan Tangga 11
Detail Pelat 2 22
Denah Sloof dan 12
Detail Pelat Atap 23
Pondasi
Detail Sloof 24
Denah 13
Pembalokan Lt.2 Detail Balok induk 25
Denah 14 Detail Balok Anak 26
Pembalokan Lt. 3
Legenda
KM. Pria
KM. Wanita 2 2C 3 4 5 INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI

Lobby PROGRAM SARJANA TERAPAN


TEKNIK INFRASTRUKTUR SIPIL
1725.0
MATA KULIAH
R. Staff Administrasi
465.0 110.0 575.0 575.0 PROYEK STRUKTUR REKAYASA

R. Staff LOG. BANGUNAN GEDUNG

FUNGSI BANGUNAN
R. Tunggu
PERKANTORAN

DOSEN PEMBIMBING
B DIMAS PUSTAKA DIBIANTARA ST, MSc

KM. Pria KM. Wanita


11 10 9 8 7 6 5 4 3 2 1 UP
Ir. SRI SUBEKTI MT.

300.0
R. Tunggu -0.10 -0.10

12 13 14 15 16 17 18 19 20 21 22 23
±0.00 IDENTITAS MAHASISWA
B1
1 YONI ARDIANTO PRABOWO
NRP. 10111710013104
6

150.0

900.0
NAMA GAMBAR
C
Denah Lantai 1

450.0
R. Staff LOG. Lobby R. Staff Administrasi
±0.00 ±0.00
KETERANGAN

Lokasi : Ambon
Panjang bangunan : 17,25 m
D Lebar bangunan :9m
Tinggi Bangunan : 12 m
Jumlah lantai : 3 lantai
1
5

SKALA

1 : 100

Lantai 1 Kode Gbr No. Gbr


1 1 : 100
ARS 2
Legenda
1 2 2C 3 4 5 6
Balkon
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL

KM. Pria 2125.0


MATA KULIAH
200.0 465.0 110.0 575.0 575.0 200.0
KM. Wanita PROYEK STRUKTUR REKAYASA
BANGUNAN GEDUNG

R. HRD FUNGSI BANGUNAN


A
R. Pertemuan Balkon
±4.00
PERKANTORAN

DOSEN PEMBIMBING
R. Santai

500.0
DIMAS PUSTAKA DIBIANTARA ST, MSc
11 10 9 8 7 6 5 4 3 2 1
KM. Pria KM. Wanita
Ir. SRI SUBEKTI MT.
±3.90 ±3.90
R. Santai
DN ±4.00 IDENTITAS MAHASISWA
12 13 14 15 16 17 18 19 20 21 22 23
B1
1
YONI ARDIANTO PRABOWO
6 NRP. 10111710013104

150.0

1300.0
NAMA GAMBAR
C
Denah Lantai 2
R. Pertemuan R. HRD

450.0
±4.00
±4.00 KETERANGAN

Lokasi : Ambon
D Panjang bangunan : 17,25 m
Lebar bangunan :9m

200.0
Tinggi Bangunan : 12 m
Jumlah lantai : 3 lantai
E
SKALA
1 1 : 100
5
Lantai 2 Kode Gbr No. Gbr
1 1 : 100
ARS 3
Legenda
Balkon
Mushola 1 2 2A 3 4 5 6
R. Direktur
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
PROGRAM SARJANA TERAPAN
2125.0 TEKNIK INFRASTRUKTUR SIPIL

R. Operasi 200.0 489.0 86.0 575.0 575.0 200.0 MATA KULIAH

R. Pemasaran PROYEK STRUKTUR REKAYASA


BANGUNAN GEDUNG

R. Santai LT.3 A FUNGSI BANGUNAN


Balkon
+8.00
PERKANTORAN

DOSEN PEMBIMBING

500.0
11 10 9 8 7 6 5 4 3 2 1
Mushola DIMAS PUSTAKA DIBIANTARA ST, MSc
R. Santai LT.3 +8.00 Ir. SRI SUBEKTI MT.
12 13 14 15 16 17 18 19 20 21 22 23
+8.00
B1 IDENTITAS MAHASISWA
1
6

150.0
YONI ARDIANTO PRABOWO
NRP. 10111710013104

1300.0
NAMA GAMBAR
C
Denah Lantai 3

450.0
R. Operasi R. Pemasaran R. Direktur
+8.00 +8.00 +8.00
KETERANGAN

Lokasi : Ambon
D Panjang bangunan : 17,25 m

200.0
Lebar bangunan :9m
Tinggi Bangunan : 12 m
E Jumlah lantai : 3 lantai

SKALA
1
5 1 : 100

Lantai 3 Kode Gbr No. Gbr


1 1 : 100
ARS 4
E D C B1 B A
Balok induk 30/45
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
Pelat atap t= 10 cm PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL

Atap MATA KULIAH


1200.0
Pelat t = 12 cm PROYEK STRUKTUR REKAYASA
BANGUNAN GEDUNG

Railling kaca
FUNGSI BANGUNAN
800.0

PERKANTORAN
Lantai 3
Kolom 45/45 DOSEN PEMBIMBING
591.3 800.0
DIMAS PUSTAKA DIBIANTARA ST, MSc

Railling kaca Ir. SRI SUBEKTI MT.

400.0
IDENTITAS MAHASISWA
Lantai 2 YONI ARDIANTO PRABOWO
NRP. 10111710013104

191.3
400.0
Sloof 35/50 NAMA GAMBAR

Tanah urugan Pot. Melintang


0.0

Tanah Asli Lantai 1 KETERANGAN


0.0
Lokasi : Ambon
Pondasi Panjang bangunan : 17,25 m
Lebar bangunan :9m
-200.0 Tinggi Bangunan : 12 m
Jumlah lantai : 3 lantai

SKALA
Elv. -850
1 : 100
Potongan Melintang
1 1 : 100
Kode Gbr No. Gbr

ARS 5
6 5 4 3 2 1
200.0 575.0 575.0 575.0 200.0
Balok induk 30/45 INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
PROGRAM SARJANA TERAPAN
Pelat atap t= 10 cm TEKNIK INFRASTRUKTUR SIPIL
Atap
MATA KULIAH
1200.0
Kolom 45/45
PROYEK STRUKTUR REKAYASA
Railling kaca BANGUNAN GEDUNG

Pelat t = 12 cm
FUNGSI BANGUNAN

Lantai 3 PERKANTORAN
800.0 DOSEN PEMBIMBING
Railling kaca
DIMAS PUSTAKA DIBIANTARA ST, MSc

Ir. SRI SUBEKTI MT.

IDENTITAS MAHASISWA
Lantai 2
YONI ARDIANTO PRABOWO

Sloof 35/50 400.0 NRP. 10111710013104

NAMA GAMBAR
Tanah urugan
Pot. Memanjang
Tanah Asli
Lantai 1 KETERANGAN
0.0

Lokasi : Ambon
Pondasi Panjang bangunan : 17,25 m
-200.0 Lebar bangunan :9m
Tinggi Bangunan : 12 m
Jumlah lantai : 3 lantai

SKALA
Elv. -850

1 : 100
Potongan Memanjang Kode Gbr No. Gbr
1 1 : 100
ARS 6
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL

MATA KULIAH

PROYEK STRUKTUR REKAYASA


BANGUNAN GEDUNG

FUNGSI BANGUNAN
Atap
1200.0 PERKANTORAN

DOSEN PEMBIMBING
DIMAS PUSTAKA DIBIANTARA ST, MSc

Ir. SRI SUBEKTI MT.

Lantai 3 IDENTITAS MAHASISWA


800.0
YONI ARDIANTO PRABOWO
NRP. 10111710013104

NAMA GAMBAR

Tampak Utara
Lantai 2
400.0 KETERANGAN

Lokasi : Ambon
Panjang bangunan : 17,25 m
Lebar bangunan :9m
Lantai 1 Tinggi Bangunan : 12 m
Jumlah lantai : 3 lantai
0.0

SKALA
Tampak Utara
1 1 : 100
1 : 100

Kode Gbr No. Gbr

ARS 7
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL

MATA KULIAH

PROYEK STRUKTUR REKAYASA


BANGUNAN GEDUNG
Atap
1200.0 FUNGSI BANGUNAN

PERKANTORAN

DOSEN PEMBIMBING
DIMAS PUSTAKA DIBIANTARA ST, MSc
Lantai 3
Ir. SRI SUBEKTI MT.
800.0
IDENTITAS MAHASISWA
YONI ARDIANTO PRABOWO
NRP. 10111710013104

NAMA GAMBAR
Lantai 2
400.0 Tampak Timur

KETERANGAN

Lokasi : Ambon
Lantai 1 Panjang bangunan : 17,25 m
0.0 Lebar bangunan :9m
Tinggi Bangunan : 12 m
Jumlah lantai : 3 lantai
Tampak Timur
1 1 : 100 SKALA

1 : 100

Kode Gbr No. Gbr

ARS 8
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL

MATA KULIAH

PROYEK STRUKTUR REKAYASA


BANGUNAN GEDUNG
Atap
1200.0 FUNGSI BANGUNAN

PERKANTORAN

DOSEN PEMBIMBING
DIMAS PUSTAKA DIBIANTARA ST, MSc
Lantai 3
Ir. SRI SUBEKTI MT.
800.0
IDENTITAS MAHASISWA
YONI ARDIANTO PRABOWO
NRP. 10111710013104

NAMA GAMBAR
Lantai 2
400.0 Tampak Selatan

KETERANGAN

Lokasi : Ambon
Lantai 1 Panjang bangunan : 17,25 m
0.0 Lebar bangunan :9m
Tinggi Bangunan : 12 m
Jumlah lantai : 3 lantai

Tampak Selatan SKALA


1 1 : 100 1 : 100

Kode Gbr No. Gbr

ARS 9
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL

MATA KULIAH
Atap
PROYEK STRUKTUR REKAYASA
1200.0 BANGUNAN GEDUNG

FUNGSI BANGUNAN

PERKANTORAN

DOSEN PEMBIMBING
Lantai 3
800.0 DIMAS PUSTAKA DIBIANTARA ST, MSc

Ir. SRI SUBEKTI MT.

IDENTITAS MAHASISWA
YONI ARDIANTO PRABOWO
NRP. 10111710013104
Lantai 2
400.0 NAMA GAMBAR

Tampak Barat

KETERANGAN

Lantai 1
0.0 Lokasi : Ambon
Panjang bangunan : 17,25 m
Lebar bangunan :9m
Tinggi Bangunan : 12 m
Tampak Barat Jumlah lantai : 3 lantai
1 1 : 100
SKALA

1 : 100

Kode Gbr No. Gbr

ARS 10
INSTITUT TEKNOLOGI SEPULUH NOPEMBER

3 2 1 C B A FAKULTAS VOKASI
PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL

MATA KULIAH
2
11 PROYEK STRUKTUR REKAYASA
BANGUNAN GEDUNG
Atap Atap
1200.0 1200.0 FUNGSI BANGUNAN

PERKANTORAN

DOSEN PEMBIMBING
DIMAS PUSTAKA DIBIANTARA ST, MSc
Lantai 3 Lantai 3
Ir. SRI SUBEKTI MT.
800.0 591.3
800.0
591.3
IDENTITAS MAHASISWA
YONI ARDIANTO PRABOWO
NRP. 10111710013104

NAMA GAMBAR
Lantai 2 Lantai 2
400.0 191.3 400.0 Potongan Tangga
191.3

KETERANGAN

Lokasi : Ambon
Lantai 1 Lantai 1 Panjang bangunan : 17,25 m
0.0 0.0 Lebar bangunan :9m
Tinggi Bangunan : 12 m
2 Jumlah lantai : 3 lantai
11

SKALA

Potongan Tangga 1 : 100


1 1 : 100 Kode Gbr No. Gbr

ARS 11
1 2 2D 3 4 5 6 INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL
200.0 575.0 575.0 575.0 200.0
MATA KULIAH
200.0 437.0 138.0 575.0 575.0 200.0
PROYEK STRUKTUR REKAYASA
BANGUNAN GEDUNG

FUNGSI BANGUNAN
A PERKANTORAN

200.0
DOSEN PEMBIMBING
SLOOF ( 35 x 50 ) SLOOF ( 35 x 50 ) SLOOF ( 35 x 50 ) B DIMAS PUSTAKA DIBIANTARA ST, MSc

SLOOF ( 35 x 50 )
Ir. SRIE SUBEKTI MT.
SLOOF ( 35 x 50 )

SLOOF ( 35 x 50 )

SLOOF ( 35 x 50 )

SLOOF ( 35 x 50 )
SLOOF ( 35 x 50 )

300.0
IDENTITAS MAHASISWA

SLOOF ( 35 x 50 ) 1
6
B1 YONI ARDIANTO PRABOWO
NRP. 10111710013104

150.0
NAMA GAMBAR
SLOOF ( 35 x 50 ) SLOOF ( 35 x 50 ) SLOOF ( 35 x 50 ) C
Denah Sloof dan Pondasi
SLOOF ( 35 x 50 )

SLOOF ( 35 x 50 )

SLOOF ( 35 x 50 )

SLOOF ( 35 x 50 )

450.0
KETERANGAN

Mutu

BJTP 420 Mpa


SLOOF ( 35 x 50 ) SLOOF ( 35 x 50 ) ± 0
.

SLOOF ( 35 x 50 ) D BJTS 420 Mpa


Fc' 31 Mpa

200.0
1
5
E
SKALA

1 : 100
Denah Sloof dan Pondasi
1 1 : 100
Kode Gbr No. Gbr

STR 12
1 2 2B 2C 3 4 5 6 INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL

200.0 575.0 575.0 575.0 200.0 MATA KULIAH

200.0 287.5 177.5 110.0 575.0 575.0 200.0 PROYEK STRUKTUR REKAYASA
BANGUNAN GEDUNG

FUNGSI BANGUNAN
A
BI (30 X 45)

BI (30 X 45)

BI (30 X 45)

BI (30 X 45)
P3 P2 P2 P2 P3 PERKANTORAN

200.0
+4.00 +4.00
12cm +4.00 12cm +4.00 12cm +4.00 12cm 12cm
DOSEN PEMBIMBING
BI (30 X 45) K1 BI (30 X 45) K1 BI (30 X 45) K1 BI (30 X 45) K1 BI (30 X 45) B DIMAS PUSTAKA DIBIANTARA ST, MSc

Ir. SRIE SUBEKTI MT.


BA (25 x 30)

BA (25 x 30)
BI (30 X 45)

BI (30 X 45)

BI (30 X 45)

BI (30 X 45)
BA (25 x 30)
IDENTITAS MAHASISWA

450.0
P2 P1 P1 P1 P1 P2

+4.00 +4.00 12cm +4.00 12cm +4.00 12cm +4.00 12cm +4.00
12cm 12cm
1 YONI ARDIANTO PRABOWO
NRP. 10111710013104
6

1300.0
NAMA GAMBAR
BI (30 X 45) K1 BI (30 X 45) K1 BI (30 X 45) K1 BI (30 X 45) K1 BI (30 X 45)

C Denah Pembalokan Lt.2


BA (25 x 30)

BI (30 X 45)

BI (30 X 45)
BA (25 x 30)
BI (30 X 45)

BI (30 X 45)

450.0
P2 P1 P1 P1 P1 P1 P1 P2
KETERANGAN

BA (25 x 30)
+4.00 +4.00 12cm +4.00 12cm +4.00 12cm +4.00 12cm +4.00 12cm +4.00 12cm +4.00
12cm 12cm

Mutu

BI (30 X 45) K1 BI (30 X 45) K1 BI (30 X 45) + 4


.0
P 1

1
2
cm

K1 BI (30 X 45) K1 BI (30 X 45) D BJTP 420 Mpa


BJTS 420 Mpa
BI (30 X 45)

BI (30 X 45)

BI (30 X 45)

BI (30 X 45)
P3 P2 P2 P2 P3

200.0
Fc' 31 Mpa
+4.00 12cm +4.00 +4.00 +4.00 +4.00 12cm
12cm 12cm 12cm

E
SKALA

1 1 : 100
5
Kode Gbr No. Gbr
Denah Pembalokan Lt 2
1 1 : 100
STR 13
1 2 2B 2A 3 4 5 6 INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL

200.0 575.0 575.0 575.0 200.0 MATA KULIAH

PROYEK STRUKTUR REKAYASA


200.0 287.5 201.5 86.0 575.0 575.0 200.0 BANGUNAN GEDUNG

FUNGSI BANGUNAN
A
P2 P2 P2 PERKANTORAN

200.0

200.0
P3 P3
+8.00 12cm +8.00 12cm +8.00 12cm
+8.00 12cm +8.00 12cm DOSEN PEMBIMBING
K1 BI (30 X 45) K1 BI (30 X 45) K1 BI (30 X 45) K1 B
DIMAS PUSTAKA DIBIANTARA ST, MSc

Ir. SRIE SUBEKTI MT.

300.0
BI (30 X 45)
BI (30 X 45)

BI (30 X 45)
BI (30 X 45)
BA (25 x 30)

BA (25 x 30)

BA (25 x 30)
P1 P1 IDENTITAS MAHASISWA

450.0
P2 P1 P1 P2

+8.00 12cm +8.00 12cm +8.00 12cm


+8.00 12cm +8.00 12cm
+8.00 12cm
B1
1 YONI ARDIANTO PRABOWO
NRP. 10111710013104
6

150.0
NAMA GAMBAR
K1 BI (30 X 45) K1 BI (30 X 45) K1 BI (30 X 45) K1

C Denah Pembalokan Lt. 3

BI (30 X 45)

BA (25 x 30)
BI (30 X 45)

BI (30 X 45)
BA (25 x 30)

BA (25 x 30)
BI (30 X 45)

450.0

450.0
P2 P1 P1 P1 P1 P1 P1 P2
KETERANGAN
+8.00 12cm +8.00 +8.00 +8.00 +8.00 +8.00 +8.00 +8.00 12cm
12cm 12cm 12cm 12cm 12cm 12cm

Mutu

K1 BI (30 X 45) K1 BI (30 X 45) K1 BI (30 X 45) K1 D BJTP 420 Mpa


BJTS 420 Mpa
P2 P2 P2

200.0

200.0
P3 P3 Fc' 31 Mpa
+8.00 12cm +8.00 12cm +8.00 12cm
+8.00 12cm +8.00 12cm

E
SKALA

1 1 : 100
5
Denah Pembalokan Lt.3 Kode Gbr No. Gbr
1 1 : 100
STR 14
1 2 3 4 5 6

INSTITUT TEKNOLOGI SEPULUH NOPEMBER


2125.0 FAKULTAS VOKASI
PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL
200.0 575.0 575.0 575.0 200.0
MATA KULIAH

PA3
A PROYEK STRUKTUR REKAYASA
BANGUNAN GEDUNG

200.0
PA2 PA2 PA2 PA3

+12.00 10cm
+12.00 10cm +12.00 10cm +12.00 10cm +12.00 10cm
FUNGSI BANGUNAN

K1 BI (30 X 45) K1 BI (30 X 45) K1 BI (30 X 45) K1 B PERKANTORAN

DOSEN PEMBIMBING
BI (30 X 45)

BI (30 X 45)

BI (30 X 45)

BI (30 X 45)

450.0
PA2 PA2
PA PA PA
DIMAS PUSTAKA DIBIANTARA ST, MSc
+12.00 10cm +12.00 10cm
+12.00 10cm +12.00 10cm +12.00 10cm
1 Ir. SRIE SUBEKTI MT.

6
IDENTITAS MAHASISWA

1300.0
K1 BI (30 X 45) K1 BI (30 X 45) K1 BI (30 X 45) K1 C YONI ARDIANTO PRABOWO
NRP. 10111710013104

NAMA GAMBAR
BI (30 X 45)

BI (30 X 45)

BI (30 X 45)

BI (30 X 45)
PA2
PA PA PA

450.0
PA2

+12.00 10cm
+12.00 +12.00 +12.00 +12.00
Denah Pembalokan Atap
10cm 10cm 10cm 10cm

KETERANGAN
K1 BI (30 X 45) K1 BI (30 X 45) K1 BI (30 X 45) K1 D

200.0
PA3 PA2 PA2 PA2 PA3
Mutu
+12.00 10cm +12.00 10cm +12.00 10cm +12.00 10cm +12.00 10cm

BJTP 420 Mpa


E BJTS 420 Mpa
Fc' 31 Mpa

1
5
SKALA

1 : 100
Kode Gbr No. Gbr
Atap
1 1 : 100
STR 15
27.5
P1 12cm
3 D19 3 D19
Ø10 -120 mm

Ø10 -150 mm

13.1
30.0

30.0
Ø10 -120 mm
17.4

INSTITUT TEKNOLOGI SEPULUH NOPEMBER


FAKULTAS VOKASI
PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL

25.0 MATA KULIAH


2 D19 25.0
2 D16
PROYEK STRUKTUR REKAYASA
BANGUNAN GEDUNG

Detail tangga 1 Balok Bordes 1 Detail Balok Tangga FUNGSI BANGUNAN

3 4 1 : 10 5
1 : 10 1 : 10 PERKANTORAN

DOSEN PEMBIMBING

DIMAS PUSTAKA DIBIANTARA ST, MSc

Ir. SRIE SUBEKTI MT.

IDENTITAS MAHASISWA

2 2A YONI ARDIANTO PRABOWO


NRP. 10111710013104

NAMA GAMBAR

437.6
23

22
5 Ø10 -150 mm
21 16 Detail Tangga 1
Ø10 -150 mm
B
20

19
Ø10 -150 mm
18
KETERANGAN
208.7

17
11 10 9 8 7 6 5 4 3 2 1

120.0
16

+173.9
+156.5
+139.1
+121.7
+104.3
+87.0
+69.6
+52.2
+34.8
+17.4
15

14 Mutu
2
Ø10 -150 mm 13

+191.3
12
16 BJTP 420 Mpa
Ø10 -150 mm
10
11
4 BJTS 420 Mpa
9 16 12 13 14 15 16 17 18 19 20 21 22 23 Fc' 31 Mpa
Ø10 -150 mm

+208.7
+226.1
+243.5
+260.9
+278.3
+295.7
+313.0
+330.4
+347.8
+365.2
+382.6
+400.0
8

7
Ø10 -150 mm
6

5 3
4
16
3 SKALA
2

135.1 As indicated
Kode Gbr No. Gbr

Potongan tangga 1 Denah Tangga 1


2 1 : 50 1 1 : 50
STR 16
2A 2

25.0 3 D16
3 D19 INSTITUT TEKNOLOGI SEPULUH NOPEMBER
Ø10 -150 mm FAKULTAS VOKASI
27.5 PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL
3 Lantai 3
800.0 Ø10 -120 mm MATA KULIAH
17.4

30.0
Ø10 -200 mm

30.0
PROYEK STRUKTUR REKAYASA
BANGUNAN GEDUNG

23 Ø10 FUNGSI BANGUNAN

2 D16 PERKANTORAN
25.0
2 D19
DOSEN PEMBIMBING
Detail tangga 2 Balok Tangga Balok Bordes
3 4 1 : 10
5 1 : 10
DIMAS PUSTAKA DIBIANTARA ST, MSc
1 : 10 Ir. SRIE SUBEKTI MT.

IDENTITAS MAHASISWA

YONI ARDIANTO PRABOWO


NRP. 10111710013104
2 2A
NAMA GAMBAR

23
4 Detail Tangga 2
22
17
465.6
21
Ø10 -150 mm
20

19 Ø10 -150 mm KETERANGAN


18
417.4
208.7

17 Ø10 -150 mm

120.0
16 2
15 11 10 9 8 7 6 5 4 3 2 1 Mutu
17
14
591.3
13
BJTP 420 Mpa
252.4

12
Ø10 -150 mm 11
BJTS 420 Mpa
10 5 800.0 Fc' 31 Mpa
Ø10 -150 mm 9 17
Ø10 -150 mm 8
12 13 14 15 16 17 18 19 20 21 22 23
7
191.3

4 SKALA
2
3
3
1 17 493.1 As indicated
Kode Gbr No. Gbr

Potongan tangga 2 Denah tangga 2


2 1 : 50
1 1 : 50
STR 17
1 2 2C 3 4 5 6
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL

2125.0 MATA KULIAH

200.0 465.0 110.0 575.0 575.0 200.0 PROYEK STRUKTUR REKAYASA


BANGUNAN GEDUNG

FUNGSI BANGUNAN
A

200.0
PERKANTORAN
Ø10 - 150mm
m
01-∅

DOSEN PEMBIMBING
B
DIMAS PUSTAKA DIBIANTARA ST, MSc
Ø10 - 150mm Ø10 - 150mm
Ir. SRIE SUBEKTI MT.
VOID

450.0
IDENTITAS MAHASISWA
Ø10 - 150mm 1
YONI ARDIANTO PRABOWO
6 NRP. 10111710013104
Ø10 - 150mm

Ø10 - 150mm

Ø10 - 150mm

Ø10 - 150mm

Ø10 - 150mm
Ø10 - 150mm
Ø10 - 150mm

1300.0
Ø10 - 150mm

NAMA GAMBAR

C Denah Penulangan Pelat Lt.2

450.0
Ø10 - 150mm
KETERANGAN

Mutu
+ 0
.4
P 1

m
c2
1 + 4
.0
P 1

1
2
cm + 4
.0
P 1

1
2
cm + 4
.0
P 1

1
2
cm + 4
.0
P 1

1
2
cm + 4
.0
P 1

1
2
cm + 4
.0
P 1

1
2
cm + 4
.0
P 1

1
2
cm + 4
.0
P 1

1
2
cm

D BJTP 420 Mpa


BJTS 420 Mpa

200.0
Ø10 - 150mm Fc' 31 Mpa

E
SKALA

1
5
1 : 100
Denah Penulangan Pelat Lt 2 Kode Gbr No. Gbr
1 1 : 100
STR 18
1 2 2A 3 4 5 6

INSTITUT TEKNOLOGI SEPULUH NOPEMBER


FAKULTAS VOKASI
2125.0 PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL

200.0 489.0 86.0 575.0 575.0 200.0 MATA KULIAH

PROYEK STRUKTUR REKAYASA


BANGUNAN GEDUNG

Ø10 - 150mm
FUNGSI BANGUNAN

200.0
Ø10 - 150mm
∅10 - 100mm

PERKANTORAN
B
DOSEN PEMBIMBING
Ø10 - 150mm
Ø10 - 150mm

300.0
VOID DIMAS PUSTAKA DIBIANTARA ST, MSc

B1 Ir. SRIE SUBEKTI MT.

Ø10 - 150mm 1
IDENTITAS MAHASISWA
6

150.0
Ø10 - 150mm

Ø10 - 150mm

Ø10 - 150mm

Ø10 - 150mm

Ø10 - 150mm
Ø10 - 150mm

Ø10 - 150mm

1300.0
YONI ARDIANTO PRABOWO
Ø10 - 150mm

NRP. 10111710013104

C NAMA GAMBAR

450.0
Denah Penulangan Pelat Lt.3
Ø10 - 150mm

KETERANGAN

D Mutu

200.0
Ø10 - 150mm BJTP 420 Mpa
BJTS 420 Mpa
E Fc' 31 Mpa

1 SKALA
5

1 : 100
Denah Penulangan Pelat Lt.3 Kode Gbr No. Gbr
1 1 : 100
STR 19
1 2 3 4 5 6

INSTITUT TEKNOLOGI SEPULUH NOPEMBER


FAKULTAS VOKASI
PROGRAM SARJANA TERAPAN
200.0 575.0 575.0 575.0 200.0 TEKNIK INFRASTRUKTUR SIPIL

MATA KULIAH

Ø10 - 150mm PROYEK STRUKTUR REKAYASA


A BANGUNAN GEDUNG

200.0
FUNGSI BANGUNAN
∅10 - 100mm

B PERKANTORAN

Ø10 - 150mm DOSEN PEMBIMBING

450.0
DIMAS PUSTAKA DIBIANTARA ST, MSc

Ir. SRIE SUBEKTI MT.


1
6 IDENTITAS MAHASISWA

Ø10 - 150mm
Ø10 - 150mm

Ø10 - 150mm

Ø10 - 150mm
C YONI ARDIANTO PRABOWO
NRP. 10111710013104

Ø10 - 150mm NAMA GAMBAR

450.0
Denah Penulangan Atap

KETERANGAN

D
P 1 P 1 P 1 P 1 P 1 P 1 P 1 P 1

+ 0
.4 m
c2
1 + 4
.0 1
2
cm + 4
.0 1
2
cm + 4
.0 1
2
cm + 4
.0 1
2
cm + 4
.0 1
2
cm + 4
.0 1
2
cm + 4
.0 1
2
cm

Mutu

200.0
Ø10 - 150mm

BJTP 420 Mpa


E BJTS 420 Mpa
Fc' 31 Mpa

1
5 SKALA

1 : 100
Kode Gbr No. Gbr
Denah Penulangan Atap
1 1 : 100
STR 20
2 2B

287.5
2B 2

Ø10 -150 mm
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
C PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL

MATA KULIAH
Lantai 2

12.0
400.0 PROYEK STRUKTUR REKAYASA
BANGUNAN GEDUNG

2 2
FUNGSI BANGUNAN
Ø10 - 150mm
21 21

450.0
PERKANTORAN

DOSEN PEMBIMBING

DIMAS PUSTAKA DIBIANTARA ST, MSc


Ø10 - 150mm Pot. Pelat P1 Ir. SRIE SUBEKTI MT.

2 1 : 25 IDENTITAS MAHASISWA

+ 4 .0 0
P1

1 2 cm

D YONI ARDIANTO PRABOWO


NRP. 10111710013104

NAMA GAMBAR

Detail pelat 1
PELAT P1
1 1 : 50
KETERANGAN

Mutu

BJTP 420 Mpa


BJTS 420 Mpa
Fc' 31 Mpa

SKALA

As indicated
3D Pelat P1 Kode Gbr No. Gbr
3
STR 21
1 2

200.0

Ø10 -150 mm

B INSTITUT TEKNOLOGI SEPULUH NOPEMBER


FAKULTAS VOKASI
PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL
Lantai 2

12.0
Ø10 - 150mm
MATA KULIAH
400.0
2 2
PROYEK STRUKTUR REKAYASA
22 22 BANGUNAN GEDUNG

BI (30 X 45)
Ø10 - 150mm

450.0
FUNGSI BANGUNAN

Potongan Pelat P2 PERKANTORAN


2 1 : 25
Ø10 - 150mm DOSEN PEMBIMBING

DIMAS PUSTAKA DIBIANTARA ST, MSc

Ir. SRIE SUBEKTI MT.

IDENTITAS MAHASISWA
C
YONI ARDIANTO PRABOWO
NRP. 10111710013104

NAMA GAMBAR
PELAT P2
1 1 : 50
Ø10 -149 mm
Detail Pelat 2

KETERANGAN

Ø10 -150 mm
Mutu

BJTP 420 Mpa


BJTS 420 Mpa
Fc' 31 Mpa

SKALA

As indicated

3D Pelat P2 Kode Gbr No. Gbr

3
STR 22
3 4

575.0 INSTITUT TEKNOLOGI SEPULUH NOPEMBER


FAKULTAS VOKASI
PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL

C MATA KULIAH

PROYEK STRUKTUR REKAYASA


2 Ø10 - 150mm 2 BANGUNAN GEDUNG
23 23

450.0
FUNGSI BANGUNAN
Ø10 - 150mm

PERKANTORAN

D DOSEN PEMBIMBING
P 1

+ 4
.0
1
2
cm

DIMAS PUSTAKA DIBIANTARA ST, MSc

Ir. SRIE SUBEKTI MT.

PLAT ATAP 3D Pelat Atap IDENTITAS MAHASISWA


1 1 : 100
3
YONI ARDIANTO PRABOWO
NRP. 10111710013104

NAMA GAMBAR

3 4 Detail Pelat Atap

KETERANGAN

Ø10 -149 mm Mutu

BJTP 420 Mpa


Atap BJTS 420 Mpa
2.0
10.0

Fc' 31 Mpa
1200.0

SKALA

As indicated

Potongan Pelat Atap Kode Gbr No. Gbr

2 1 : 25
STR 23
35.0
Ø10 -100 mm 3 D19
Lantai 1
3 D19
0.0
2 D 13 INSTITUT TEKNOLOGI SEPULUH NOPEMBER

50.0
FAKULTAS VOKASI
Ø10 -100 mm Ø10 -100 mm PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL
Ø10 -200 mm
MATA KULIAH

3 D19
PROYEK STRUKTUR REKAYASA

Sloof Tumpuan BANGUNAN GEDUNG

A 1 : 20 FUNGSI BANGUNAN

35.0 PERKANTORAN
3 D19
Ø10 -200 mm Lantai 1
Ø10 -100 mm DOSEN PEMBIMBING
0.0
Ø10 -200 mm

50.0
DIMAS PUSTAKA DIBIANTARA ST, MSc

Ir. SRIE SUBEKTI MT.


2 D 13

4.0
IDENTITAS MAHASISWA
A B
D 24 24 C 3 D19 YONI ARDIANTO PRABOWO
NRP. 10111710013104

450.0 Sloof Lapangan


2
B 1 : 20
NAMA GAMBAR

24 112.5 80.0 65.0 80.0 112.5


Detail Sloof
Lantai 1
KETERANGAN
0.0
38.0
Lantai 1 Mutu

0.0 BJTP 420 Mpa

28.8
BJTS 420 Mpa
Tumpuan Lapangan Lap Splice Tumpuan Lapangan

28.8
Fc' 31 Mpa

30.0

B SKALA
A
24
24
Kait Sloof As indicated
Detail Sloof 2
1 1 : 20 Kode Gbr No. Gbr
1 : 25

STR 24
Ø10 -150 mm

Ø10 -100 mm
Ø10 -100 mm

5D19
Lantai 2 INSTITUT TEKNOLOGI SEPULUH NOPEMBER

12.0
FAKULTAS VOKASI
400.0 PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL

45.0
2D13
Ø10 -100 mm MATA KULIAH
Ø10 -100 mm

4.0
3D19 PROYEK STRUKTUR REKAYASA
Ø10 -150 mm 30.0 BANGUNAN GEDUNG

FUNGSI BANGUNAN
Detail BI Tumpuan
A 1 : 20
PERKANTORAN
D C
DOSEN PEMBIMBING

B 450.0 A 2 D19
DIMAS PUSTAKA DIBIANTARA ST, MSc

25 25 Lantai 2 Ir. SRIE SUBEKTI MT.

12.0
400.0 IDENTITAS MAHASISWA
2 D 13
112.5 75.0 75.0 75.0 112.5

45.0
Ø10 -150 mm
YONI ARDIANTO PRABOWO
Lantai 2 NRP. 10111710013104

4.0
400.0 NAMA GAMBAR
30.0 2 D19

Detail Balok induk


Tumpuan Lapangan Lap Splice Tumpuan Lapangan

KETERANGAN

A Detail BI Lapangan
B
B
C 25 Mutu
25
25 1 : 20
BJTP 420 Mpa
75.0 BJTS 420 Mpa
Fc' 31 Mpa
Balok Induk Lantai 2
1 1 : 25
400.0

Ø10 -100 mm SKALA

As indicated
Kode Gbr No. Gbr
Lap Splice
C 1 : 20
STR 25
C D
2
26
450.0
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
Lantai 2 PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL
400.0
4 MATA KULIAH
26

PROYEK STRUKTUR REKAYASA


2 BANGUNAN GEDUNG

26
FUNGSI BANGUNAN

PERKANTORAN

DOSEN PEMBIMBING

Balok Anak Ø10 -200 mm


DIMAS PUSTAKA DIBIANTARA ST, MSc
1 1 : 25 Ir. SRIE SUBEKTI MT.

2 D19
IDENTITAS MAHASISWA

YONI ARDIANTO PRABOWO


NRP. 10111710013104
2 D19
25.0 D NAMA GAMBAR

Lantai 2 Detail Balok Anak


400.0 24.0
3 D19 KETERANGAN
30.0

Ø10 -200 mm Lantai 2


400.0 Mutu

BJTP 420 Mpa

16.4
BJTS 420 Mpa

30.0
Fc' 31 Mpa
3 D19
25.0

SKALA
Detail Balok Anak 15.0
2 1 : 10
As indicated
Kode Gbr No. Gbr

Kait Balok Anak


4 1 : 10
STR 26
5

45.0
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
3D13 - 100 PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL

MATA KULIAH
Lantai 2
400.0 PROYEK STRUKTUR REKAYASA
BANGUNAN GEDUNG

45.0
20D22
FUNGSI BANGUNAN

Daerah Sendi Plastis


PERKANTORAN

90.0
X X
27 27 DOSEN PEMBIMBING
Pot. X-X
X 1 : 10
DIMAS PUSTAKA DIBIANTARA ST, MSc

Ir. SRIE SUBEKTI MT.


55.0

IDENTITAS MAHASISWA

3D13 - 130 YONI ARDIANTO PRABOWO


NRP. 10111710013104
Sambungan lewatan

20D22

45.0
65.0

NAMA GAMBAR

Detail Kolom K1
55.0

KETERANGAN
Y Y
27 27 45.0 Mutu
Daerah Sendi Plastis

BJTP 420 Mpa


BJTS 420 Mpa
90.1

Fc' 31 Mpa

Lantai 1 Pot. Y-Y


0.0
Y 1 : 10 SKALA

As indicated
Potongan Kolom K1 Kode Gbr No. Gbr
1 1 : 25
STR 27
45.0

3D13 - 100
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI

45.0
20D22 PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL

MATA KULIAH

PROYEK STRUKTUR REKAYASA


BANGUNAN GEDUNG

FUNGSI BANGUNAN

5D19 PERKANTORAN
5D19

DOSEN PEMBIMBING
2D13 2D13

45.0

45.0
Ø10-100 DIMAS PUSTAKA DIBIANTARA ST, MSc
Ø10-100
Ir. SRIE SUBEKTI MT.

3D19
30.0 3D19 30.0 IDENTITAS MAHASISWA

YONI ARDIANTO PRABOWO


NRP. 10111710013104

NAMA GAMBAR

3D13 - 100
Detail HBK

KETERANGAN

45.0
20D22

Mutu
45.0
BJTP 420 Mpa
BJTS 420 Mpa
Fc' 31 Mpa

SKALA

Tampak HBK Tampak Samping HBK 1 : 20


2 1 : 20
3 1 : 20 Kode Gbr No. Gbr

HBK
1 STR 28
12 D19

B
Pondasi
-200.0
INSTITUT TEKNOLOGI SEPULUH NOPEMBER

50.0
FAKULTAS VOKASI
PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL

65.0 65.0 MATA KULIAH

PROYEK STRUKTUR REKAYASA


BANGUNAN GEDUNG

Lantai 1
FUNGSI BANGUNAN
0.0 60.0 100.0 60.0
PERKANTORAN
220.0
DOSEN PEMBIMBING

Detail 2 Pondasi DIMAS PUSTAKA DIBIANTARA ST, MSc

2 1 : 20
Ir. SRIE SUBEKTI MT.

IDENTITAS MAHASISWA
12 D19

YONI ARDIANTO PRABOWO


NRP. 10111710013104
2 12 D19
29 12 D19 NAMA GAMBAR

Detail Pondasi

0.0
22
Pondasi KETERANGAN

-200.0
Mutu
50.0

220.0
BJTP 420 Mpa
BJTS 420 Mpa
Fc' 31 Mpa

220.0
2
29
SKALA

60.0 100.0 60.0


1 : 20
Kode Gbr No. Gbr

Detail Pondasi
1 1 : 20 STR 29
1 2 3 4 5 6
200.0 575.0 575.0 575.0 200.0 INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL

MATA KULIAH
Atap
Kantilever Tumpuan Lapangan Tumpuan Tumpuan Lapangan Tumpuan Tumpuan Lapangan Tumpuan Kantilever
5D19 5D19 2D19 5D19 5D19 2D19 5D19 5D19 2D19 5D19 5D19
Ø10 - 100 Ø10 - 100 Ø10 - 150 Ø10 - 100 Ø10 - 100 Ø10 - 150 Ø10 - 100 Ø10 - 100 Ø10 - 150 Ø10 - 100 Ø10 - 100

3D19 3D19 2D19 3D19 3D19 2D19 3D19 3D19 2D19 3D19 3D19
1200.0 PROYEK STRUKTUR REKAYASA
BANGUNAN GEDUNG

FUNGSI BANGUNAN

PERKANTORAN

Lantai 3
Kantilever Tumpuan Lapangan Tumpuan Tumpuan Lapangan Tumpuan Tumpuan Lapangan Tumpuan Kantilever
5D19 5D19 2D19 5D19 5D19 2D19 5D19 5D19 2D19 5D19 5D19
Ø10 - 100 Ø10 - 100 Ø10 - 150 Ø10 - 100 Ø10 - 100 Ø10 - 150 Ø10 - 100 Ø10 - 100 Ø10 - 150 Ø10 - 100 Ø10 - 100 DOSEN PEMBIMBING
3D19 3D19 2D19 3D19 3D19 2D19 3D19 3D19 2D19 3D19 3D19
800.0
DIMAS PUSTAKA DIBIANTARA ST, MSc

Ir. SRIE SUBEKTI MT.

IDENTITAS MAHASISWA

YONI ARDIANTO PRABOWO


Lantai 2
Kantilever Tumpuan Lapangan Tumpuan Tumpuan Lapangan Tumpuan Tumpuan Lapangan Tumpuan Kantilever
5D19 5D19 2D19 5D19 5D19 2D19 5D19 5D19 2D19 5D19 5D19 NRP. 10111710013104
Ø10 - 100 Ø10 - 100 Ø10 - 150 Ø10 - 100 Ø10 - 100 Ø10 - 150 Ø10 - 100 Ø10 - 100 Ø10 - 150 Ø10 - 100 Ø10 - 100

400.0
3D19 3D19 2D19 3D19 3D19 2D19 3D19 3D19 2D19 3D19 3D19
NAMA GAMBAR

Portal Memanjang

KETERANGAN
Lantai 1
Tumpuan Lapangan Tumpuan Tumpuan Lapangan Tumpuan Tumpuan Lapangan Tumpuan
3D19 3D19 3D19 3D19 3D19 3D19 3D19 3D19 3D19
Ø10 - 100 Ø10 - 200 Ø10 - 100 Ø10 - 100 Ø10 - 200 Ø10 - 100 Ø10 - 100 Ø10 - 200 Ø10 - 100

3D19 3D19 3D19 3D19 3D19 3D19 3D19 3D19 3D19


0.0 Mutu

BJTP 420 Mpa


Pondasi BJTS 420 Mpa
Fc' 31 Mpa
-200.0

SKALA

1 : 100

Portal Memanjang Kode Gbr No. Gbr

1 1 : 100
STR 30
E D C B A
200.0 450.0 450.0 200.0
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL

Atap
Kantilever Tumpuan Lapangan Tumpuan Tumpuan Lapangan Tumpuan Kantilever
5D19 5D19 2D19 5D19 5D19 2D19 5D19 5D19
Ø10 - 100 Ø10 - 100 Ø10 - 150 Ø10 - 100 Ø10 - 100 Ø10 - 150 Ø10 - 100 Ø10 - 100 MATA KULIAH
3D19 3D19 2D19 3D19 3D19 2D19 3D19 3D19
1200.0
PROYEK STRUKTUR REKAYASA
BANGUNAN GEDUNG

FUNGSI BANGUNAN

PERKANTORAN
Lantai 3
Kantilever Tumpuan Lapangan Tumpuan Tumpuan Lapangan Tumpuan Kantilever
5D19 5D19 2D19 5D19 5D19 2D19 5D19 5D19
Ø10 - 100 Ø10 - 100 Ø10 - 150 Ø10 - 100 Ø10 - 100 Ø10 - 150 Ø10 - 100 Ø10 - 100

3D19 3D19 2D19 3D19 3D19 2D19 3D19 3D19


800.0 DOSEN PEMBIMBING

DIMAS PUSTAKA DIBIANTARA ST, MSc

Ir. SRIE SUBEKTI MT.

IDENTITAS MAHASISWA

Lantai 2
Kantilever Tumpuan Lapangan Tumpuan Tumpuan Lapangan Tumpuan Kantilever
5D19 5D19 2D19 5D19 5D19 2D19 5D19 5D19
Ø10 - 100 Ø10 - 100 Ø10 - 150 Ø10 - 100 Ø10 - 100 Ø10 - 150 Ø10 - 100 Ø10 - 100 YONI ARDIANTO PRABOWO
NRP. 10111710013104
3D19 3D19 2D19 3D19 3D19 2D19 3D19 3D19
400.0
NAMA GAMBAR

Portal Melintang

Lantai 1
Tumpuan Lapangan Tumpuan Tumpuan Lapangan Tumpuan
3D19
Ø10 - 100
3D19
Ø10 - 200
3D19
Ø10 - 100
3D19
Ø10 - 100
3D19
Ø10 - 200
3D19
Ø10 - 100
KETERANGAN

3D19 3D19 3D19 3D19 3D19 3D19


0.0
Mutu
Pondasi BJTP 420 Mpa
-200.0 BJTS 420 Mpa
Fc' 31 Mpa

SKALA

1 : 100
Kode Gbr No. Gbr
Portal Melintang
1 1 : 100
STR 31
tulangan D19
Bar Shape
Shape Diameter A Quantity Type Image
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
M_00 19 mm 1191 mm 1 D19 FAKULTAS VOKASI
PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL
M_00 19 mm 2230 mm 3 D19
M_00 19 mm 2237 mm 12 D19 MATA KULIAH

M_00 19 mm 2250 mm 33 D19 PROYEK STRUKTUR REKAYASA


BANGUNAN GEDUNG
M_00 19 mm 3681 mm 3 D19
M_00 19 mm 3691 mm 3 D19 FUNGSI BANGUNAN
M_00 19 mm 4720 mm 10 D19
PERKANTORAN
M_00 19 mm 4770 mm 6 D19
M_00 19 mm 5234 mm 24 D19 DOSEN PEMBIMBING

M_00 19 mm 5253 mm 24 D19 DIMAS PUSTAKA DIBIANTARA ST, MSc

Ir. SRIE SUBEKTI MT.

IDENTITAS MAHASISWA
Sengkang 10mm
YONI ARDIANTO PRABOWO
NRP. 10111710013104
Bar Shape
Shape Diameter A B C D Quantity Type Image
NAMA GAMBAR

M_T1 10 mm 220 mm 170 mm 85 mm 85 mm 234 Ø10


BBS

KETERANGAN

M_T1 10 mm 260 mm 210 mm 85 mm 85 mm 105 Ø10


Mutu

BJTP 420 Mpa


BJTS 420 Mpa
Fc' 31 Mpa
M_T1 10 mm 370 mm 220 mm 85 mm 85 mm 3178 Ø10

SKALA
M_T1 10 mm 420 mm 270 mm 85 mm 85 mm 816 Ø10

Kode Gbr No. Gbr

STR 33
Sengkang 19 mm
Bar Shape
Shape Diameter A B C D Quantity Type Image

M_T1 13 mm 366 mm 225 mm 60 mm 60 mm 5 D 13


INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL

M_T1 13 mm 370 mm 211 mm 60 mm 60 mm 5 D 13 MATA KULIAH

PROYEK STRUKTUR REKAYASA


BANGUNAN GEDUNG

M_T1 13 mm 370 mm 220 mm 60 mm 60 mm 10 D 13 FUNGSI BANGUNAN

PERKANTORAN

DOSEN PEMBIMBING
M_T1 13 mm 370 mm 235 mm 60 mm 60 mm 5 D 13
DIMAS PUSTAKA DIBIANTARA ST, MSc

Ir. SRIE SUBEKTI MT.

M_T1 13 mm 370 mm 270 mm 60 mm 60 mm 320 D 13 IDENTITAS MAHASISWA

YONI ARDIANTO PRABOWO


NRP. 10111710013104

NAMA GAMBAR
M_T1 13 mm 370 mm 370 mm 60 mm 60 mm 1864 D 13

BBS 2

M_T1 13 mm 420 mm 270 mm 60 mm 60 mm 55 D 13 KETERANGAN

Mutu

BJTP 420 Mpa


M_T1 13 mm 870 mm 270 mm 60 mm 60 mm 10 D 13 BJTS 420 Mpa
Fc' 31 Mpa

SKALA

Kode Gbr No. Gbr

STR 34
Tulangan 10mm
Bar Shape
Shape Diameter A B C D Quantity Type Image
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
M_00 10 mm 1160 mm 0 mm 0 mm 0 mm 257 Ø10 FAKULTAS VOKASI
PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL
M_00 10 mm 1398 mm 0 mm 0 mm 0 mm 14 Ø10
MATA KULIAH
M_00 10 mm 1673 mm 0 mm 0 mm 0 mm 14 Ø10
M_00 10 mm 1788 mm 0 mm 0 mm 0 mm 34 Ø10 PROYEK STRUKTUR REKAYASA
BANGUNAN GEDUNG
M_00 10 mm 2110 mm 0 mm 0 mm 0 mm 154 Ø10
M_00 10 mm 2162 mm 0 mm 0 mm 0 mm 2 Ø10 FUNGSI BANGUNAN

M_00 10 mm 2484 mm 0 mm 0 mm 0 mm 42 Ø10


PERKANTORAN
M_00 10 mm 3833 mm 0 mm 0 mm 0 mm 9 Ø10
DOSEN PEMBIMBING
M_00 10 mm 4870 mm 0 mm 0 mm 0 mm 2 Ø10
M_00 10 mm 8198 mm 0 mm 0 mm 0 mm 60 Ø10 DIMAS PUSTAKA DIBIANTARA ST, MSc

M_00 10 mm 8239 mm 0 mm 0 mm 0 mm 62 Ø10 Ir. SRIE SUBEKTI MT.

M_00 10 mm 12915 mm 0 mm 0 mm 0 mm 286 Ø10 IDENTITAS MAHASISWA

M_00 10 mm 12960 mm 0 mm 0 mm 0 mm 448 Ø10


YONI ARDIANTO PRABOWO
NRP. 10111710013104
M_00 10 mm 14463 mm 0 mm 0 mm 0 mm 34 Ø10
M_00 10 mm 14986 mm 0 mm 0 mm 0 mm 34 Ø10 NAMA GAMBAR
M_00 10 mm 21152 mm 0 mm 0 mm 0 mm 142 Ø10
M_00 10 mm 21188 mm 0 mm 0 mm 0 mm 142 Ø10 BBS 3
M_00 10 mm 21210 mm 0 mm 0 mm 0 mm 176 Ø10
KETERANGAN

Mutu

BJTP 420 Mpa


BJTS 420 Mpa
Fc' 31 Mpa

SKALA

Kode Gbr No. Gbr

STR 35
volume balok volume lantai
Elevation at Elevation
Bottom Type Volume Berat Tipe at Bottom Volume Berat
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
BA (25 x 30) 4.62 m³ 11.08 t PLAT 12 CM 388.0 26.95 m³ 64.68 t PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL
BI (30 X 45) 42.50 m³ 102.01 t PLAT 12 CM 788.0 26.90 m³ 64.56 t
-50.0 SLOOF ( 35 x 50 ) 16.15 m³ 38.77 t Plat atap 10 cm 1190.0 24.23 m³ 58.16 t MATA KULIAH
Grand total: 129 63.27 m³ 151.86 t Grand total: 72 78.08 m³ 187.40 t
PROYEK STRUKTUR REKAYASA
BANGUNAN GEDUNG

volume kolom FUNGSI BANGUNAN

Tinggi Volume Berat Besi Tulangan


PERKANTORAN
Jumlah
1400.0 2.83 m³ 6.80 t Bar Total Bar Batang DOSEN PEMBIMBING
1400.0 2.82 m³ 6.77 t Diameter Length Reinforcement Volume Berat Besi Besi
DIMAS PUSTAKA DIBIANTARA ST, MSc
1400.0 2.83 m³ 6.80 t
1400.0 2.83 m³ 6.80 t 10 mm 28482 m 2236978.75 cm³ 17560.28 kg 2374 Ir. SRIE SUBEKTI MT.

1400.0 2.83 m³ 6.80 t 13 mm 5315 m 705524.57 cm³ 5538.37 kg 443 IDENTITAS MAHASISWA
1400.0 2.83 m³ 6.80 t 16 mm 33 m 6593.73 cm³ 51.76 kg 3
1400.0 2.83 m³ 6.80 t 19 mm 2800 m 793893.71 cm³ 6232.07 kg 233 YONI ARDIANTO PRABOWO
NRP. 10111710013104
1400.0 2.83 m³ 6.80 t 22 mm 6239 m 2371563.46 cm³ 18616.77 kg 520
1400.0 2.83 m³ 6.80 t NAMA GAMBAR
1400.0 2.83 m³ 6.80 t
1400.0 2.83 m³ 6.80 t Volume
1400.0 2.83 m³ 6.80 t
16800.0 33.97 m³ 81.53 t KETERANGAN

Mutu

BJTP 420 Mpa


BJTS 420 Mpa
Fc' 31 Mpa

SKALA

Kode Gbr No. Gbr

STR 36
BALOK INDUK SLOOF
INSTITUT TEKNOLOGI SEPULUH NOPEMBER
FAKULTAS VOKASI
PROGRAM SARJANA TERAPAN
TEKNIK INFRASTRUKTUR SIPIL
Gambar Gambar
MATA KULIAH
Tumpuan Lapangan
Tumpuan Lapangan
Dimensi 300 mm x 450 mm Dimensi 350 mm x 500 mm PROYEK STRUKTUR REKAYASA
BANGUNAN GEDUNG
Tulangan Atas 5D19 2D19 Tulangan Atas 3D19 3D19
Tulangan Tengah 2D13 2D13 Tulangan Tengah 2D13 2D13 FUNGSI BANGUNAN
Tulangan Bawah 3D19 2D19 Tulangan Bawah 3D19 3D19
Tul. Sengkang Ø10 - 100 Ø10 - 150 Tul. Sengkang Ø10 - 100 Ø10 - 200 PERKANTORAN
Selimut 40 mm 40 mm Selimut 40 mm 40 mm
DOSEN PEMBIMBING

DIMAS PUSTAKA DIBIANTARA ST, MSc

Ir. SRIE SUBEKTI MT.

IDENTITAS MAHASISWA
Balok Anak Balok Bordes
YONI ARDIANTO PRABOWO
NRP. 10111710013104

NAMA GAMBAR
Gambar Gambar

Tumpuan Lapangan Tumpuan Lapangan


Tabel Balok
Dimensi 250 mm x 300 mm Dimensi 250 mm x 300 mm

Tulangan Atas 2D19 2D19 Tulangan Atas 3D16 3D16


KETERANGAN
Tulangan Tengah - - Tulangan Tengah 2Ø10 2Ø10
Tulangan Bawah 3D19 3D19 Tulangan Bawah 216 2D16 Mutu
Tul. Sengkang Ø10 - 200 Ø10 - 200 Tul. Sengkang Ø10 - 120 Ø10 - 120
BJTP 420 Mpa
Selimut 40 mm 40 mm Selimut 20 mm 20 mm BJTS 420 Mpa
Fc' 31 Mpa

SKALA

1 : 20
Kode Gbr No. Gbr

STR 37