a=Bxc 334.05
Σ Pn 5046.091776 Σ Mn 1209.575422
Σ Pn 5030.344591 Σ Mn 1208.306311
Σ Pn 3786.369582 Σ Mn 1015.300139
Tinjauan Beban Aksial dan Momen Lentur E. Batas Struktur Boleh Dianggap Hanya Menahan Momen Lentur Saja
Load Pu Mu PuØ = 0,01 x fc' x b x h PuØ = 0,01 x fc' x b x h = 122500 N
P1 50 125 = 122.5 Kn
P2 150 175 PuØ = PuØnb PuØ = PuØnb = 3269.723984 Kn
P3 250 225 Dipilih Yang Terkecil = 122.5 Kn
P4 350 275 F. Tinjauan Keadaan Beban P = 0
P5 450 325 Karena As' = As Maka Tulangan Pasti Belum Leleh
P6 0 0 Nilai P = 600 x AS' -fy x AS / 1,7 x f'c x b P = 600 x AS' -fy x AS / 1,7 x f'c x b = 7.239415126 mm
P7 0 0 Nilai q = 600 x B1 x ds' x AS' / 0,85 x f'c x b q = 600 x B1 x ds' x AS' / 0,85 x f'c x b = 1554.569143 N/mm2
P8 0 0 Tegangan persegi tekan beton a = sqrt ( p2 + q ) - p a = sqrt ( p2 + q ) - p = 39.99673561 mm
P9 0 0 G. Karena Tulangan Tekan Memang Belum Leleh
P10 0 0 Dihitung Tegangan Tulangan Tekan
Dihitung Tegangan Tulangan Tekan ( Fs' ) F's =( a - B1 x ds' / a ) x 600 = 89.95837557 N/mm2
Fs' < Fy
89.96 < 410 Status Tul Belum Leleh
H. Kontrol Tulangan
a_Maks = 600 * B1 * Dd / 600 + fy = 333.2673267 mm
a < a_Maks
39.9967356 < 333.26733 Status Tul Sudah Leleh
I. Mengcheck Momen Ultimate
Mu Rencana < Ø Mn
- Momen Nominal Yang di Hasilkan Oleh Gaya Tekan beton
Mnc = 0,85 x fc' x a x b (d-a/2 ) Mnc = 0,85 x fc' x a x b (d-a/2 ) = 380769894 N.mm
= 380.769894 Kn.m
- Momen Nominal Yang di Hasilkan Oleh Gaya Tekan Tulangan
Mns = AS' x fs' ( d - ds' ) Mns = AS' x fs' ( d - ds' ) = 63222278.57 N.mm
= 63.22227857 Kn.m
Nilai Momen Nominal Yang Di Dapat
Mn = Mnc + Mns = 443.9921726 Kn.m
Nilai Momen Rencananya Adalah
Mr = 0,8 x Mn = 355.1937381 Kn.m
Mr = 0,65 x Mn = 288.5949122 Kn.m