SI dan DD Interkoneksi D.

I Kawasan Payakumbuh Seltimut


Kota Payakumbuh Laporan Akhir

DAFTAR ISI
BAB 1 PENDAHULUAN 1-

1.1 LATAR BELAKANG...............................................................................................1-1


1.2 MAKSUD DAN TUJUAN........................................................................................1-2
1.3 IDENFITIKASI MASALAH......................................................................................1-2
1.4 LOKASI PEKERJAAN............................................................................................1-3
1.5 LINGKUP KEGIATAN............................................................................................1-3
1.6 SISTEMATIKA PEMBAHASAN.............................................................................1-6

BAB 2 GAMBARAN UMUM 2-

2.1 LETAK DAN PENCAPAIAN LOKASI.....................................................................2-1


2.2 KONDISI GEOGRAFIS, TOPOGRAFI DAN GEOHIDROLOGI..............................2-2
2.2.1 Kondisi Geografis.............................................................................................2-3
2.2.2 Kondisi Topografi..............................................................................................2-3
2.2.3 Kondisi Geologis...............................................................................................2-4
2.2.4 Kondisi Geohidrologi.........................................................................................2-9
2.3 ADMINISTRATIF.................................................................................................2-19
2.4 KEPENDUDUKAN...............................................................................................2-26
2.4.1 Pertumbuhan Penduduk.................................................................................2-26
2.4.2 Persebaran Kepadatan...................................................................................2-29
2.4.3 Struktur Penduduk..........................................................................................2-30
2.4.4 Pendidikan......................................................................................................2-35
2.5 SOSIAL MASYARAKAT......................................................................................2-36
2.6 PEREKONOMIAN...............................................................................................2-38
2.6.1 Pertumbuhan Produk Domestik Regional Bruto (PDRB)................................2-38
2.6.2 Pertumbuhan Produk Domestik Regional Bruto (PDRB) Per Kapita...............2-38
2.6.3 Sektor Unggulan Perekonomian.....................................................................2-39
2.6.4 Fasilitas Perekonomian...................................................................................2-41

PT. WIRANTA BHUANA RAYA Bab 2 -


SI dan DD Interkoneksi D.I Kawasan Payakumbuh Seltimut
Kota Payakumbuh Laporan Akhir

2.6.5 Komoditi Daerah.............................................................................................2-41


2.7 KEGIATAN BUDIDAYA PERTANIAN..................................................................2-50
2.8 KELEMBAGAAN..................................................................................................2-51
2.9 RENCANA POLA RUANG...................................................................................2-53
2.10 TINJAUAN TERHADAP KRITERIA PEMBANGUNAN IRIGASI...........................2-54
2.11 KONDISI EKSISTING DI LAPANGAN.................................................................2-56
2.12 PERMASALAHAN YANG ADA DI LAPANGAN...................................................2-66

BAB 3 ANALISA DATA 3-

3.1 ANALISIS DATA...................................................................................................3-1


3.1.1 Analisis Topografi.........................................................................................3-1
3.1.2 Analisis Hidrologi........................................................................................3-12
3.1.3 Analisis Sosial.............................................................................................3-81
3.1.4 Analisis Mektan...........................................................................................3-90
3.2 SYSTEM PLANNING...........................................................................................3-94
3.2.1 Interkoneksi................................................................................................3-95
3.3 NOMEN KLATUR..............................................................................................3-101
3.4 SKEMA JARINGAN IRIGASI.............................................................................3-101
3.5 PETAK IRIGASI.................................................................................................3-110

BAB 4 KRITERIA PERENCANAAN 4-1


4.1 DASAR-DASAR DAN KRITERIA PERENCANAAN..................................................4-1
4.1.1 Kriteria Perencanaan Saluran..........................................................................4-1
4.1.2 Perencanaan Hidrolis Saluran.........................................................................4-2
4.1.3 Kontrol Kecepatan dan Tractive Force.............................................................4-5
4.1.4 Perhitungan Dimensi Saluran..........................................................................4-9
4.2 PERENCANAAN BANGUNAN.................................................................................4-9
4.2.1 Kriteria Perencanaan Bangunan Air.................................................................4-9
4.2.2 Bangunan Pengambilan (Bagi dan Sadap)......................................................4-9
4.2.3 Bangunan Pengatur.......................................................................................4-10
4.3 Bangunan Pelengkap.............................................................................................4-11

PT. WIRANTA BHUANA RAYA Bab 2 -


SI dan DD Interkoneksi D.I Kawasan Payakumbuh Seltimut
Kota Payakumbuh Laporan Akhir

4.3.1 Bangunan Terjun...........................................................................................4-11


4.3.2 Gorong-gorong..............................................................................................4-15
4.3.3 Gorong-gorong Pembuang............................................................................4-16
4.4 Perencanaan Hidrolis Bangunan............................................................................4-17
4.4.1 Perencanaan Bangunan Pengatur Air...........................................................4-17

BAB 5 PERENCANAAN SALURAN 5-1


5.1 PERENCANAAN SALURAN.......................................................................................5-1
5.1.1 Dimensi Saluran Pasangan Primer.....................................................................5-2
5.1.2 Saluran Pasangan Sekunder..............................................................................5-3
5.1.3 Dimensi Saluran Pasangan Tersier....................................................................5-6
5.1.4 Dimensi Saluran Sekunder (Ier Baru)...............................................................5-17
5.1.5 Dimensi Saluran Sekunder (Interkoneksi).......................................................5-29
5.2 PERENCANAAN BANGUNAN.................................................................................5-34
5.2.1 Kriteria Perencanaan Bangunan Air.................................................................5-34
5.2.2 Bangunan Pengambilan (Bagi Dan Sadap)......................................................5-34

BAB 6 RENCANA ANGGARAN BIAYA DAN ANALISA EKONOMI 6-1


6.1 RENCANA ANGGARAN BIAYA.................................................................................6-1
6.1.1 Maksud Dan Tujuan..........................................................................................6-2
6.1.2 Volume Pekerjaan.............................................................................................6-2
6.1.3 Pekerjaan Tanah...............................................................................................6-2
6.1.4 Pekerjaan Konstruksi Bangunan.......................................................................6-3
6.1.5 Estimasi Biaya..................................................................................................6-4
6.1.6 Harga Satuan Upah Dan Bahan........................................................................6-4
6.1.7 Analisa penggunaan Alat..................................................................................6-5
6.1.8 Analisa penggunaan Alat..................................................................................6-5
6.1.9 Harga Satuan Pekerjaan...................................................................................6-6
6.1.10 Rencana Anggaran Biaya (RAB).....................................................................6-6
6.2 ANALISA EKONOMI...............................................................................................6-150

BAB 7 METODA PELAKSANAAN DAN OPERASI/PEMELIHARAAN 7-1


7.1 METODA PELAKSANAAN.........................................................................................7-1

PT. WIRANTA BHUANA RAYA Bab 2 -


SI dan DD Interkoneksi D.I Kawasan Payakumbuh Seltimut
Kota Payakumbuh Laporan Akhir

7.1.1 Pekerjaan Persiapan.........................................................................................7-1


7.1.2 Pekerjaan Lining Saluran..................................................................................7-2
7.1.3 Pekerjaan Bangunan Pelimpah.........................................................................7-5
7.1.4 Pekerjaan Beton Bertulang Mutu K175.............................................................7-8
7.2 OPERASI DAN PEMELIHARAAN.............................................................................7-10
7.2.1 Rencana Pembagian Air...................................................................................7-10
7.2.2 Prosedur Rencana Tanam................................................................................7-11
7.2.3 Pengoperasiaan Saat Hujan.............................................................................7-12
7.2.4 Pengoperasiaan Saat Kemarau........................................................................7-13
7.2.5 Prosedur Operasi Bangunan Pengambilan (Intake).........................................7-13
7.2.6 Prosedur Operasi Bangunan Pengatur.............................................................7-14
7.2.7 Pemeliharaan Rutin..........................................................................................7-14
7.2.8 Pemeliharaan Berkala......................................................................................7-18

BAB 8 PENUTUP 8-1

PT. WIRANTA BHUANA RAYA Bab 2 -


SI dan DD Interkoneksi D.I Kawasan Payakumbuh Seltimut
Kota Payakumbuh Laporan Akhir

DAFTAR TABEL
Tabel 2. 1 Sungai-sungai Utama Yang Mengalir di Payakumbuh......................................2-11
Tabel 2. 2 Curah Hujan Rata-Rata.....................................................................................2-12
Tabel 2. 3 Kondisi Iklim Tanjung Pati.................................................................................2-14
Tabel 2. 4 Daftar Profil Kecamatan di Payakumbuh...........................................................2-19
Tabel 2. 5 Daftar Profil Kecamatan di Payakumbuh...........................................................2-20
Tabel 2. 6 Pembagian Penggunaan Lahan Menurut Kegunaan di Kota Payakumbuh.......2-20
Tabel 2. 7 Pembagian Penggunaan Lahan Menurut Kegunaan di Kabupaten 50 Kota......2-22
Tabel 2. 8 Daftar Kecamatan dan Persentase Jumlah Penduduk......................................2-26
Tabel 2. 9 Daftar Pertumbuhan Jumlah Penduduk............................................................2-28
Tabel 2. 10 Daftar Pertumbuhan Jumlah Penduduk Kabupaten 50 Kota...........................2-29
Tabel 2. 11 Daftar Ratio Penduduk Berdasarkan Jenis Kelamin........................................2-31
Tabel 2. 12 Daftar Ratio Penduduk Berdasarkan Jenis Kelamin........................................2-31
Tabel 2. 13 Jumlah Penduduk Berdasarkan Kelompok Umur, Tahun 2014.......................2-32
Tabel 2. 14 Jumlah Penduduk Berdasarkan Kelompok Umur, Tahun 2014.......................2-33
Tabel 2. 15 Jumlah Penduduk Berdasarkan Mata Pencaharian, Tahun 2012....................2-34
Tabel 2. 16 Jumlah Penduduk Berdasarkan Mata Pencaharian, Tahun 2014....................2-34
Tabel 2. 17 Jumlah Penduduk Berdasarkan Tingkat Pendidikan, Tahun 2014..................2-35
Tabel 2. 18 Sebaran Sarana Pendidikan, Tahun 2014.......................................................2-37
Tabel 2. 19 Sebaran Fasilitas Kesehatan, Tahun 2014......................................................2-37
Tabel 2. 20 Sebaran Fasilitas Rumah Ibadah, Tahun 2014...............................................2-38
Tabel 2. 21 Pdrb Perkapita Tahun 2014 Kota Payakumbuh..............................................2-39
Tabel 2. 22 Perkembangan Jumlah Koperasi Menurut Jenis Koperasi..............................2-40
Tabel 2. 23 Sebaran Jenis Irigasi dan Hasil Panen Pertanian...........................................2-42
Tabel 2. 24 Sebaran Hasil Panen Palawija........................................................................2-43
Tabel 2. 25 Sebaran Populasi Ternak...............................................................................2-44
Tabel 2. 26 Sebaran Populasi Ternak (Unggas)................................................................2-45

PT. WIRANTA BHUANA RAYA Bab 2 -


SI dan DD Interkoneksi D.I Kawasan Payakumbuh Seltimut
Kota Payakumbuh Laporan Akhir

Tabel 2. 27 Sebaran Komoditi Sayur-sayuran...................................................................2-46


Tabel 2. 28 Sebaran Komoditi Buah-buahan.....................................................................2-46
Tabel 2. 29 Sebaran Komoditi Perkebunan.......................................................................2-47
Tabel 2. 30 Sebaran Komoditi Perikanan (Pembudidaya Ikan).........................................2-48
Tabel 2. 31 Sebaran Komoditi Perikanan (Hasil Benih Ikan).............................................2-48
Tabel 2. 32 Sebaran Komoditi Perikanan (Budidaya Ikan Rakyat)....................................2-49
Tabel 2. 33 Sebaran Komoditi Perikanan (Penangkapan Ikan di Perairan Umum)...........2-49
Tabel 2. 34 Daftar P3A......................................................................................................2-51
Tabel 2. 35 Lokasi Koordinat Bendung..............................................................................2-57

Tabel 3.1 Hasil Pengukuran Topografi BM...........................................................................3-5


Tabel 3.2 Hasil Pengukuran Topografi CP...........................................................................3-6
Tabel 3.3 Curah Hujan Rata-Rata Stasiun Hujan Tj. Pati 10 Tahun Terakhir.....................3-14
Tabel 3.4 Data Iklim........................................................................................................... 3-16
Tabel 3.5 Hasil Rekapitulasi Metode Chi Kuadrat..............................................................3-20
Tabel 3.6 Hasil Rekapitulasi Metode Chi Kuadrat Semua DI.............................................3-21
Tabel 3.7 Pengukuran Debit Aliran Hulu Bendung.............................................................3-24
Tabel 3.8 Pengukuran Debit Aliran Hilir Bendung..............................................................3-24
Tabel 3.9 Rekapitulasi Hasil Pengukuran Debit Bendung Seluruh DI................................3-25
Tabel 3.10 Curah Hujan Harian Maximum.........................................................................3-26
Tabel 3.11 Curah Hujan Maximum Rencana......................................................................3-28
Tabel 3.12 Syarat Pemilihan Metode Frekuensi.................................................................3-30
Tabel 3.13 Resume Uji Kesesuaian...................................................................................3-34
Tabel 3.14 Hasil Perhitungan Distribusi Curah Hujan........................................................3-36
Tabel 3.15 Distibusi Infiltrasi (Horton) dan Hujan Effektif...................................................3-37
Tabel 3.16 Resume Debit Banjir Sub DAS Batang Agam..................................................3-44
Tabel 3.17 Hubungan Temperatur Rata-rata dengan Parameter Evapotranspirasi A, B dan ea
........................................................................................................................................... 3-49
Tabel 3.18 Nilai Radiasi Matahari pada Permukaan Horizontal di Luar Atmosfir, dalam mm/hari
........................................................................................................................................... 3-50
Tabel 3.19 Koefisien Refleksi.............................................................................................3-51
Tabel 3.20 Debit Andalan Batang Agam Metoda F.J Mock ( 2005 – 2014).....................3-60
Tabel 3.21 Debit Andalan Batang Agam Metoda NRECA ( 2005 – 2014)........................3-60

PT. WIRANTA BHUANA RAYA Bab 2 -


SI dan DD Interkoneksi D.I Kawasan Payakumbuh Seltimut
Kota Payakumbuh Laporan Akhir

Tabel 3.22 Data Debit (m3/s).............................................................................................3-61


Tabel 3.23 Rekapitulasi Debit Andalan Q80 Kawasan DI Payakumbuh Seltimut...............3-62
Tabel 3.24 Tabel Evapotranspirasi.....................................................................................3-66
Tabel 3.25 Harga-harga Koefisien Tanaman Padi dan Palawija........................................3-69
Tabel 3.26 Curah Hujan Efektif untuk Padi sebagai Prosentase Curah Hujan Setengah Bulanan
R80.................................................................................................................................... 3-70
Tabel 3.27 Inventarisasi sumber Air...................................................................................3-72
Tabel 3.28 Besar Debit Sesaat..........................................................................................3-73
Tabel 3.29 Perhitungan Kebutuhan Air Irigasi DI Batang Agam.........................................3-74
Tabel 3.30 Kebutuhan Air Irigasi DI Batang Agam.............................................................3-75
Tabel 3.31 Rekapitulasi DR Seluruh DI Seltimut................................................................3-77
Tabel 3.32 Rekapitulasi Data NFR DI-DI Seltimut..............................................................3-77
Tabel 3.33 Rekapitulasi Data Perbandingan Debit Andalan dan DR DI-DI Seltimut...........3-79
Tabel 3.34 Rekapitulasi Neraca Air Irigasi DI Seltimut (eksisting).....................................3-80
Tabel 3.35 Sumber Air DI Seltimut.....................................................................................3-84
Tabel 3.36 Rekapitulasi Luasan DI Eksisting dan Rencana...............................................3-85
Tabel 3.37 Proyeksi Peningkatan Produktivitas Lahan di DI Kawsan Seltimut...................3-89
Tabel 3.38 Analisis Pendapatan Usahatani Padi Sawah per hektar per Musim Tanam di Lokasi
Survei................................................................................................................................. 3-90
Tabel 3.39 Kondisi Neraca Air DI Kawasan Payakumbuh Seltimut....................................3-96
Tabel 3.40 Daftar DI. Interkoneksi...................................................................................3-100
Tabel 3.41 Petak DI Sei Dareh.........................................................................................3-110
Tabel 3.42 Petak DI Batang Tabit....................................................................................3-111
Tabel 3.43 Petak DI Batang Agam...................................................................................3-114
Tabel 3.44 Petak DI Batang Sikali....................................................................................3-115
Tabel 3.45 Petak DI Bulakan............................................................................................3-115
Tabel 3.46 Petak DI Sai Talang.......................................................................................3-116
Tabel 3.47 Petak DI Sai Bai.............................................................................................3-116
Tabel 3.48 Petak DI Beringin...........................................................................................3-116
Tabel 3.49 Petak DI Bandar Darek...................................................................................3-117
Tabel 3.50 Petak DI Bandar Piraweh...............................................................................3-117
Tabel 3.51 Petak DI L. M. Gadang...................................................................................3-117
Tabel 3.52 Petak DI Bandar Patai....................................................................................3-117

PT. WIRANTA BHUANA RAYA Bab 2 -


SI dan DD Interkoneksi D.I Kawasan Payakumbuh Seltimut
Kota Payakumbuh Laporan Akhir

Tabel 3.53 Petak DI Bandar Sikampung..........................................................................3-118


Tabel 3.54 Petak DI Padang Jariang................................................................................3-118
Tabel 3.55 Petak DI Tanjung 5 Kampung........................................................................3-118
Tabel 3.56 Petak DI Baramban Nan Tuo.........................................................................3-119
Tabel 3.57 Petak DI Tanjung Rajo...................................................................................3-119
Tabel 3.58 Petak DI Bandar Kaluek.................................................................................3-119
Tabel 3.59 Petak DI Pincuran Tujuh.................................................................................3-120
Tabel 3.60 Petak DI Bandar Simpang..............................................................................3-120
Tabel 3.61 Petak DI Bandar Rawang...............................................................................3-120
Tabel 3.62 Petak DI Tanjung Panta.................................................................................3-120
Tabel 3.63 Petak DI Bandar Dalam..................................................................................3-121
Tabel 4. 1 Koefisien Kekasaran Strickler Saluran Tanah.....................................................4-3
Tabel 4. 2 Koefisien Kekasaran Strickler Saluran Pasangan...............................................4-3
Tabel 4. 3 Tinggi Jagaan (Free Board) Minimum.................................................................4-4
Tabel 4. 4 Lebar Minimum Tanggul......................................................................................4-4
Tabel 4. 5 Kecepatan Izin Maksimum Yang Diizinkan Pada Saluran...................................4-6
Tabel 4. 6 Tractive Force yang diizinkan..............................................................................4-8
Tabel 4. 7 Perbandingan Tak Berdimensi Untuk Loncat Air...............................................4-15
Tabel 6. 1 Daftar Harga Satuan Dasar Tenaga Kerja...........................................................6-7
Tabel 6. 2 RAB DI Seltimut................................................................................................6-15
Tabel 6. 3 RAB DI Sei Dareh.............................................................................................6-16
Tabel 6. 4 RAB DI Batang Tabit.........................................................................................6-17
Tabel 6. 5 RAB DI Batang Tabit Bawah.............................................................................6-18
Tabel 6. 6 RAB DI Batang Agam........................................................................................6-19
Tabel 6. 7 RAB DI Batang Sikali........................................................................................6-20
Tabel 6. 8 RAB DI Bulakan................................................................................................6-21
Tabel 6. 9 RAB DI Sei Talang............................................................................................6-22
Tabel 6. 10 RAB DI Sei Baih..............................................................................................6-23
Tabel 6. 11 RAB DI Beringin..............................................................................................6-24
Tabel 6. 12 RAB DI Bandar Darek.....................................................................................6-25
Tabel 6. 13 RAB DI Bandar Piraweh..................................................................................6-26
Tabel 6. 14 RAB DI Lumau Munggu Gadang.....................................................................6-27
Tabel 6. 15 RAB DI Bandar Patai.......................................................................................6-28

PT. WIRANTA BHUANA RAYA Bab 2 -


SI dan DD Interkoneksi D.I Kawasan Payakumbuh Seltimut
Kota Payakumbuh Laporan Akhir

Tabel 6. 16 RAB DI Bandar Padang Sikampung................................................................6-29


Tabel 6. 17 RAB DI Bandar Padang Jariang......................................................................6-29
Tabel 6. 18 RAB DI Baramban Nan Tuo............................................................................6-30
Tabel 6. 19 RAB DI Tanjung Lima Kampung......................................................................6-31
Tabel 6. 20 RAB DI Tanjung Rajo......................................................................................6-32
Tabel 6. 21 RAB DI Bandar Kaluek....................................................................................6-33
Tabel 6. 22 RAB DI Pincuran Tujuh...................................................................................6-34
Tabel 6. 23 RAB DI Bandar Simpang.................................................................................6-35
Tabel 6. 24 RAB DI Bandar Rawang..................................................................................6-36
Tabel 6. 25 RAB DI Tanjung Panta....................................................................................6-37
Tabel 6. 26 RAB DI Bandar Dalam....................................................................................6-38
Tabel 6. 27 Biaya Produksi Per Hektar............................................................................6-151
Tabel 6. 28 Perhitungan Biaya Produksi dan Nilai Hasil Produksi....................................6-152
Tabel 6. 29 Perhitungan Biaya Produksi dan Nilai Hasil Produksi....................................6-152
Tabel 6. 30 Kenaikan Pendapatan Petani........................................................................6-153
Tabel 6. 31 Manfaat Bersih/ Incremental Net Benefit petani...........................................6-153
Tabel 6. 32 Perhitungan Present Annuity Dengan Benefit Cos Ratio (10 %)..................6-154
Tabel 6. 33 Perhitungan Kumulatif B-C (Suku bunga 20 %)...........................................6-156

PT. WIRANTA BHUANA RAYA Bab 2 -


SI dan DD Interkoneksi D.I Kawasan Payakumbuh Seltimut
Kota Payakumbuh Laporan Akhir

DAFTAR GAMBAR
Gambar 1. 1 Lokasi Pekerjaan DED Rehabilitasi DI. Kawasan Seltimut di Kota Payakumbuh
(2.025 Ha)........................................................................................................................... 1-3
YGambar 2. 1 Pencapaian Lokasi…………………………………………………………………2-1
Gambar 2. 2 Lokasi Pekerjaan Berdasarkan Peraturan Menteri Pekerjaan Umum dan
Perumahan Rakyat..............................................................................................................2-2
Gambar 2. 3 Lokasi Sungai Indragiri...................................................................................2-2
Gambar 2. 4 Peta Geologi Regional Solok..........................................................................2-5
Gambar 2. 5 Curah Hujan Rata-Rata STA Suliki, Tanjung Pati dan Lintau Buo.................2-13
Gambar 2. 6 Potensi Air Tanah..........................................................................................2-17
Gambar 2. 7 Grafik Pembagian Lahan di Kota Payakumbuh............................................2-21
Gambar 2. 8 Grafik Pembagian Lahan di Kabupaten 50 Kota...........................................2-22
Gambar 2. 9 Peta Administrasi Kota Payakumbuh............................................................2-23
Gambar 2. 10 Peta Jaringan Irigasi Kota Payakumbuh.....................................................2-24
Gambar 2. 11 Peta Stasiun Hujan.....................................................................................2-25
Gambar 2. 12 Persentase Luas Wilayah Tiap Kecamatan................................................2-27
Gambar 2. 13 Grafik Pertumbuhan Jumlah Penduduk......................................................2-28
Gambar 2. 14 Grafik Mata Pencaharian............................................................................2-34
Gambar 2. 15 Grafik Jenis Irikasi dan Hasil Produksi........................................................2-42
Gambar 2. 16 Grafik Produksi Jagung dan Ubi Kayu........................................................2-43
Gambar 2. 17 Grafik Populasi Hewan Ternak...................................................................2-44
Gambar 2. 18 Grafik Mata Pencaharian............................................................................2-45
Gambar 2. 19 Gambar Kesesuaian Lahan Untuk DI Seltimut............................................2-54
Gambar 2. 20 Peta Administrasi Kota Payakumbuh beserta lokasi DI Seltimut.................2-56
Gambar 2. 21 D.I. Sei Dareh..............................................................................................2-59
Gambar 2. 22 D.I. Batang Tabit.........................................................................................2-59
Gambar 2. 23 D.I. Batang Agam........................................................................................2-59
Gambar 2. 24 D.I. Batang Sikali.........................................................................................2-60
Gambar 2. 25 D.I. Bulakan.................................................................................................2-60

PT. WIRANTA BHUANA RAYA Bab 2 -


SI dan DD Interkoneksi D.I Kawasan Payakumbuh Seltimut
Kota Payakumbuh Laporan Akhir

Gambar 2. 26 D.I. Sei Talang............................................................................................2-60


Gambar 2. 27 D.I. Sei Bai..................................................................................................2-61
Gambar 2. 28 D.I. Bendung Beringin.................................................................................2-61
Gambar 2. 29 D.I. Bandar Darek.......................................................................................2-61
Gambar 2. 30 D.I. Bandar Piraweh....................................................................................2-62
Gambar 2. 31 D.I. Limaumunggu Gadang.........................................................................2-62
Gambar 2. 32 D.I. Bandar Patai.........................................................................................2-62
Gambar 2. 33 D.I. Bandar Padang Sikampung..................................................................2-63
Gambar 2. 34 D.I. Bandar Padang Jariang........................................................................2-63
Gambar 2. 35 D.I. Tanjung Lima Kampung........................................................................2-63
Gambar 2. 36 D.I. Barambanan Nan Tuo..........................................................................2-64
Gambar 2. 37 D.I. Tanjung Rajo........................................................................................2-64
Gambar 2. 38 D.I. Bandar Kaluek......................................................................................2-64
Gambar 2. 39 D.I. Pincuran Tujuh......................................................................................2-65
Gambar 2. 40 D.I. Bandar Simpang...................................................................................2-65
Gambar 2. 41 D.I. Bandar Rawang....................................................................................2-65
Gambar 2. 42 D.I. Tanjung Panta......................................................................................2-66
Gambar 2. 43 D.I. Bandar Dalam.......................................................................................2-66
Gambar 2. 44 Tidak Terdapat Nomenklatur.......................................................................2-67
Gambar 2. 45 Terdapat Saluran yang Mengalami Kerusakan...........................................2-68
Gambar 2. 46 Terdapat Sampah dan Tumbuhan Liar di Sekitar Bangunan.......................2-68
Gambar 2. 47 Terdapat Sampah dan Tumbuhan Liar di Sekitar Bangunan serta tidak
ada nya jalan inspeksi........................................................................................................2-69
Gambar 3.1 Konstruksi Bench Mark Beton..........................................................................3-2
Gambar 3.2 Konstruksi Cek Point Beton..............................................................................3-3
Gambar 3.3 Lokasi BM-1.....................................................................................................3-3
Gambar 3.4 Sektsa Pengukuran Seltimut............................................................................3-4
Gambar 3.5 Contoh Deskripsi BM-1....................................................................................3-7
Gambar 3.6 Contoh Deskripsi BM-2....................................................................................3-8
Gambar 3.7 Contoh Deskripsi BM-3....................................................................................3-9
Gambar 3.8 Contoh Deskripsi CP-1...................................................................................3-10
Gambar 3.9 Contoh Deskripsi CP-2...................................................................................3-11
Gambar 3.10 Contoh Deskripsi CP-3.................................................................................3-12

PT. WIRANTA BHUANA RAYA Bab 2 -


SI dan DD Interkoneksi D.I Kawasan Payakumbuh Seltimut
Kota Payakumbuh Laporan Akhir

Gambar 3.11 Peta POS Stasiun Curah Hujan Provinsi Sumatera Barat...........................3-13
Gambar 3.12 Grafik Curah Hujan Stasiun Tanjung Pati.....................................................3-14
Gambar 3.13 Lokasi Pengujian Hidrometri Batang Agam..................................................3-23
Gambar 3.14 Plotting Position Curah Hujan Maximum Rencana.......................................3-29
Gambar 3.15 Bentuk Hidrograph HSS ITB-1 dan HSS ITB-2 (tak berdimensi)..................3-39
Gambar 3.16 Hidrograph Satuan Sintetis menurut Snyders...............................................3-40
Gambar 3.17 Hidrograph Satuan Sintetis menurut Nakayasu............................................3-42
Gambar 3.18 Perbandingan Hasil Cara Nakayasu, Alexeyev, ITB-1/2 untuk Tr=50 tahun.(Sub
DAS Batang Agam)............................................................................................................ 3-44
Gambar 3.19 model rainfall-runoff......................................................................................3-45
Gambar 3.20 Bagan Alir Prediksi Debit Dengan Metoda Mock..........................................3-47
Gambar 3.21 Bagan Alir Perhitungan Debit Dalam Metoda Mock......................................3-47
Gambar 3.22 Skema Model NRECA..................................................................................3-57
Gambar 3.23 Grafik Kalibrasi.............................................................................................3-61
Gambar 3.24 Neraca Keseimbangan Air DI Batang Agam pada Alternatif 6......................3-76
Gambar 3.25 Gambar Kesesuaian Lahan Untuk D.I. Seltimut...........................................3-83
Gambar 3.26 Posisi Pengambilan Sample.........................................................................3-91
Gambar 3.27 Keadaan Tanah Titik 1.................................................................................3-92
Gambar 3.28 Proses Hand Boring Titik 1...........................................................................3-93
Gambar 3.29 Proses Test Pit Titik 1...................................................................................3-93
Gambar 3.30 Proses Sondir Titik 1....................................................................................3-94
Gambar 3.31 Flowchart Interkoneksi..................................................................................3-98
Gambar3.32 Peta Situasi Wilayah Rencana......................................................................3-99
Gambar3.33 Desain Interkoneksi.....................................................................................3-100
Gambar3.34 Skema Jaringan Interkoneksi Dareh............................................................3-104
Gambar3.35 Skema Bangunan Interkoneksi Dareh.........................................................3-105
Gambar 3.36 Skema Jaringan Interkoneksi Tabit 1.........................................................3-106
Gambar 3.37 Skema Bangunan Interkoneksi Tabit 1.......................................................3-107
Gambar 3.38 Skema Jaringan Interkoneksi Tabit 2.........................................................3-108
Gambar 3.39 Skema Bangunan Interkoneksi Tabit 2.......................................................3-109
Gambar 4. 1 Tata Letak bangunan Bagi Sadap.................................................................4-10
Gambar 4. 2 Bentuk mercu bangunan pengatur ambang tetap..........................................4-11
Gambar 4. 3 Peristilahan dalam Bangunan Terjun Tegak..................................................4-11

PT. WIRANTA BHUANA RAYA Bab 2 -


SI dan DD Interkoneksi D.I Kawasan Payakumbuh Seltimut
Kota Payakumbuh Laporan Akhir

Gambar 4. 4 Grafik tak berdimensi dari geometri bangunan terjun tegak (Bos, Replogle and
Clemmens, 1984)............................................................................................................... 4-13
Gambar 4. 5 Peristilahan dalam Bangunan Terjun Miring..................................................4-13
Gambar 6. 1 Diagram Analisis Volume Pekerjaan dan Estimasi Biaya................................6-1
Gambar 6. 2 Hubungan B/C vs Suku Bunga....................................................................6-155
Gambar 6. 3 Hubungan B/C vs Suku Bunga 20 %...........................................................6-156
Gambar 6. 4 Hubungan B/C vs Suku Bunga 15 %...........................................................6-157

PT. WIRANTA BHUANA RAYA Bab 2 -