Anda di halaman 1dari 67

URAIAN PEKERJAAN

NO. GAMBAR & JENIS PEKERJAAN


PERHITUNGAN VOL SAT
I. PEKERJAAN PERSIAPAN
1. Pekerjaan pembersihan

Luas Tanah

P= 21.14
L= 12.29

1
2
.4
1
Luas= P x L
= 21.14 x 12.29
= 259.81 M² 259.81 M²

12.29

2. Pengukuran & Pemasangan Bouwplank

P.horisontal= 10.21+(2.15 x 4)+2.31+7.14+2.62+


= 11.01+(3.05 x 4)+3.00+12.29+2.50+12.63
= 84.51 M¹
2.31

P.vertikal= 21.14+3.00+11.55+5.65+2.35+7.06+
1
5
.5

081

= 1.40+5.15+10.81+6.97
1.

2.15
7.14 = 75.08 M¹
2.62
1
15
.5

35

11.01
2
.

Tot P.bouwplank= 84.51 + 75.08


6
55
4

.
11

= 159.59 M¹ 159.59 M¹
2.

3.00
3.05
12.29
0
3
.0

4
1
.0

2.50

URAIAN PEKERJAAN
II. PEKERJAAN GALIAN TANAH PERHITUNGAN VOL SAT
1 Vol Galian Tanah Pondasi 1.30
0.90
0.90
0.80
0.90
0.60

V= (L.atas + L.bawah) / 2 × Tinggi x P.gal dalam


V= (1,30 m + 0,90 m) / 2 × 0,90 × 159.59 m
V= 158 M³ 158 M³

2 Vol Urugan Pasir Bawah pondasi


Vol Urugan Pasir :
V= (L.Bawah + L.Atas) × T.Pondasi × P.Total
V= (0,90 m + 0,92 m) × 0,05 m × 159.59 m
V= 14.52 M³ 14.52 M³

3 Pas Batu Kosong


Vol Pas Batu Kosong :
V= (L.Bawah + L.Atas) × T.Pondasi × P.Total
V= (0,92 m + 0,99 m) × 0,15 m × 159.59 m
V= 45.72 M³ 45.72 M³

0.64 0.99
0.15 0.15
0.61 0.92
0.61 0.05 0.92
0.05
0.60 0.90
0.64 0.99
0.15 0.15
0.61 0.92

4 Pas Pondasi Batu Kali Sisi Tepi


0.05 & Dalam
0.61
0.60
0.92
0.90
0.05

Vol Pas Pondasi Batu Kali sisi dalam :


0.64 0.99 V= ((L.Bawah + L.Atas) / 2) × T.Pondasi × P.Total
0.15
0.61
0.15
0.92 V= ((0,70 m + 0,30 m) / 2) × 0,70 m × 159.59 m
0.61
0.60
0.05 0.92
0.90
0.05 V= 55.86 M³ 55.86 M³

0.30
5 Pek UruganTanah Kembali
Vol urugan

7
0
.0
0.50
Tanah Kembali= (Vol Gal Tanah - Vol Urugan Pasir -
0.30
Vol Batu Kosong - Vol Pondasi Batu Kali)
7
0
.0
= 158 - 14.52 - 45.72 - 55.86
0.70
= 41.89 M³ 41.89 M³

0.80

0.30
.7
0 0
0
.9

0.50
0

0.64
5

0.61
.1
0

6 Pek Peninggi Lantai 1.) Loket Pendaftaran


0.05
0.60

1.30

0.30 2.50 x 3.00


= 7.50 M²
0
.7
0
.90

0.70
0

0.99
2.) Ruang Tunggu
5

0.92
.1
0

0.05
0.90
3.00 x 2.84
= 8.52 M² Total = 30.83 M²
5.90 x 1.92
= 11.33 M²
2.86 x 3.84
= 10.98 M²
3.) Poli Gigi, Poli Umum, Ruang Inap 1 dan 2
(1.92 x 2) + (2.00 x 2) x 3.05
= 16.04 M²
4.) Ruang Tindakan
3.00 x 3.30
= 9.90 M²
5.) Lab 1 dan 2, KIA
7.14 x 3.35
= 23.92 M²
6.) Dapur
00

2.15
2
.

2.30 5.65
0

2.30 x 3.71
2
2
.

KM/WC
8
1
.3

KM/WC
= 8.53
Dapur
7.) KM/WC Umum
5
1
.0
7
31

1
.

5
6

6
.

KM/WC
2.15 x (1.83+1.50+1.83)
8
1
.3

Ruang Inap
1.57 2.62 2.95 = 11.09 M²
0

0
0

3
2

1
.

1.18 Lab 8.) Teras Belakang


Ruang Inap KIA
5

25.81 x 1.10
3

1.18
0

Lab
2
0

.
2
.

2.20
Poli Umum = 28.39 M²
92

Ruang
1
.

30

Tindakan
3
.

Poli Gigi 2.86 Apotik Total Luasan Lantai= 136.21 M² 136.21 M²


9
12

3.00
.

3.05 Ruang Tunggu


2

5.90
9
1
.

Vol Urugan Tanah Peningi


6.44
Loket
Pendaftaran 3.35 Lantai Teras= 28.39 x 0.12
0

0
0

0
3

3
.

= 3.41 M³
3
1
.

2.50
Lantai Utama Lantai Utama
6

Teras
4

KM/WC
2

Vol Urugan Tanah Peningi


.

0.03 0.00 0.00


0.01
0.05 0.01
0.01
0.04
0.04 0.01
0.04
0.04
Lantai KM/WC= 11.09 x 0.10
0.10 0.10 0.10
0.10
0.12 0.15 0.10 0.15
= 1.11 M³

Vol Urugan Tanah


Peningi Lantai= (7.50+30.83+16.04+9.90+23.92+8.53) x 0.15
= 96.72 x 0.15
= 14.51 M³

Total= 19.02 M³ 19.02 M³

Teras Lantai Utama Lantai Utama


0.00 KM/WC 0.00
0.03 0.05
0.01
0.01
0.04 0.01
0.01
0.04
Vol Urugan Pasir Peninggi Lantai= 136.21 x 0.10
0.04 0.04
0.10 0.10 0.10 = 13.62 M³ 13.62 M³
0.10
0.12 0.15 0.10 0.15
0.00 KM/WC 0.00
0.03 0.05
0.01 0.01
0.01 0.04 0.01 0.04
0.04
0.04
0.10 0.10 0.10
0.10
0.12 0.15 0.10 0.15
0.10
0.12 0.15 0.10 0.15

Vol spesi Lantai= 136.21 x 0.04


= 5.45 M³ 5.45 M³

Vol Total Peninggian Lantai= 19.02 + 13.62 + 5.45


= 38.09 M³ 38.09 M³

URAIAN PEKERJAAN
NO. GAMBAR & JENIS PEKERJAAN
PERHITUNGAN VOL SAT
III. PEKERJAAN BETON
1 Pak Sloof

Total Panjang Sloof= 159.59 0.15


Lebar Sloof= 0.15 5.98 M³
Tinggi sloof= 0.25

2
0
.5
Vol sloof= 0.15 x 0.25 x 159.59
= 5.98 M³

2 Pek Tiang Kolom

0.15
0.15
Sloof Tiang Kolom
Tinggi Tiang

Panjang= 0.15
Lebar= 0.15 SlofTiangKolm
TingiTang
3. 5
Tinggi Tiang= 3.35
Jlm Kolom= 44 2.95 M³

V= ( P x L ) x ( T x JK )
= ( 0,15 x 0,15 ) x ( 3,35 x 44)
= 0.02 x 147.4
= 2.95 M³

0.15
3 Pek Ring Balok
2
0
.5

Total Panjang Ring Balok= 159.59


Lebar Ring Balok= 0.15
Tinggi Ring Balok= 0.25

Vol Ring Balok= 0.15 x 0.25 x 159.59


= 5.98 M³ 5.98 M³
0.06

1.72

1
0
.2
2
2
.5
1.40
0.06

1.72

2
URAIAN PEKERJAAN

1
0
.
Pekerjaan Kusen Kayu PERHITUNGAN VOL SAT
1. Pek Pintu, Jendela dan Fentilasi
a. >P 1 (1 Buah)

2
2
.5
1.40 Luas Penampang Kusen= 0.06 x 0.12
= 0.0072 M²
0.06

1.12 Luas Pintu = 1.71 + (2 x 2.25) 6.22 M²

1
0
.2
05 = 6.22 M²

b. >P 2 (15 Buah)


2
.

0.06

Luas Penampang Kusen= 0.06 x 0.12

1
0
.2
= 0.0072 M²
Luas Jendela= 1.12 + (2 x 2.05) 78.30 M²
= 5.22 M²

Total = 5.22 x 15
05

= 78.3 M²
2
.

c. >P 3 (1 Buah) 0.06

1.65
1
0
.2

Luas Penampang Kusen= 0.06 x 0.12


= 0.0072 M²
5

4.98 M²
.7
1

Luas Jendela= (0.88) + (2 x 2.05)


= 4.98 M²
0.06

1.32 2.38
12

d. >J 1 (2 buah)
0
.
0

0
.2

.2
1

Luas Penampang Kusen= 0.06 x 0.12


1.12 2.18 = 0.0072 M²
Luas Jendela= (2 x 1.65) + (3 x 1.75) 17.10 M²
= 8.55 M²
0.06
Total = 8.55 x 2
= 17.10 M²

1.32 2.38
1
0
.2

e. >J 2 Loket (1 buah)


1.20

1.20

1.12 2.18 Luas Penampang Kusen= 0.06 x 0.12


= 0.0072 M²
6.16 M²

Luas Jendela= (2 x 1.32) + (2 x 1.20) + 1.12


= 6.16 M²
KM/WC

KM/WC
Dapur

KM/WC

Ruang Inap

Lab
Ruang Inap KIA
Lab

Poli Umum
Ruang
Tindakan
Poli Gigi
Apotik

Ruang Tunggu

Loket
Pendaftaran
KM/WC

KM/WC
Dapur
f. >J 3 Loket dan Apotik (1 buah) KM/WC

Ruang Inap

Lab
Ruang Inap KIA
Lab

Poli Umum

0
.2
Ruang
Luas Penampang Kusen= 0.06 x 0.12

0
Tindakan
Poli Gigi
Apotik = 0.0072 M²
Ruang Tunggu Luas Jendela= (2 x 2.38) + (3 x 1.20) + 2.18 20.80 M²
= 10.54 M²
Loket
Pendaftaran

Total = 2 x 10.54
= 20.80 M²

Luas Pek Pintu dan Jendela


= P1+P2+P3+J1+J2+J3
= 6.22 + 78.30 + 4.98 + 17.10 + 6.16 + 20.80
= 133.56 M² 133.56 M²
URAIAN PEKERJAAN
IV. PEKERJAAN DINDING & KAYU PERHITUNGAN VOL SAT
1. Pek Lubang Dinding
Panjang Total Dinding= 159.59 M²
Tinggi Dinding= 3.35 M¹

Luas Total Dinding= 159.59 x 3.35


= 534.63
Luas Pek Lubang Kusen Pintu dan Jendela
Luas Total Kusen= 133.56

Luas Dinding= 534.63 - 133.56 2.01 M³


= 401.07 M²

Vol Batu Bata= 0,25 x 0,20 x 0,10


= 0.01 M³

Total Vol Dinding= 0,01 x 401.07


= 2.01 M³

URAIAN PEKERJAAN
NO GAMBAR & JENIS PEKERJAAN
PERHITUNGAN VOL SAT
V. PEKERJAAN DINDING
1. Pasangan Batu Tela 1 : 4 (Dinding Biasa)
Luas Total= Luas Pintu + Jendela
= 133.56 M²

Luas Dinding 1 : 4 = 401


Luas Dinding Sopi" = 14.06
Luas Kusen = 133.56
L= (L.Dinding 1:4 + L.Dinding Sopi-Sopi) - L.Kusen 282 M²
= 401 + 14.06 - 133.56
= 282 M²

2. Pasangan Batu Tela 1 : 2 (Dinding Terasram)


Luas = Luas Pintu
P1= 6.22
P2= 78.30
P3= 4.98 +
Total= 89.50 M²

89.50 M²

Luas Dinding 1 : 2 = 120.32


Luas Kusen = 89.50

L= Luas Dinding 1 : 2 - Luas Kusen


= 120.32 - 89.50
= 31 M² 31 M²
KM/WC

KM/WC
Dapur
3. Plesteran Dinding 1 : 4 (Plesteran Biasa)
KM/WC
Luas Total Dinding 1 : 4 = 401
Ruang Inap L= Luas Dinding 1 : 4 x 2 Sisi
Lab
Ruang Inap KIA
Lab
KM/WC

Ruang Inap

Lab = 401 x 2.00


Ruang Inap KIA
Lab = 802 M² 802 M²
Poli Umum
Ruang
Tindakan
Poli Gigi
Apotik

Ruang Tunggu

Loket
Pendaf taran
Ruang Inap KIA
Lab

Poli Umum
Ruang
Tindakan
4. Plesteran Dinding 1 : 2 (Ples
Poli Gigi Terasram)
Apotik

Ruang Tunggu
Luas Total Dinding 1 : 2 = 120.32
L= Luas Dinding 1 : 2 x 2 Sisi
= 120.32 x 2.00
Loket
Pendaf taran = 241 M² 241 M²

5. Pek. Acian Dinding


Luas Plesteran Dinding 1 : 4 = 802
Luas Plesteran Dinding 1 : 2 = 241
1.83 1.50 L= L Plesteran 1 : 4 + L Plesteran 1 : 2
0.20 = 802 + 241
0.20
KM / WC
0.25 = 1043 M² 1043 M²
KM / WC 0.20
5

5
.1

1
2

2
.

URAIAN PEKERJAAN
NO GAMBAR & JENIS PEKERJAAN
PERHITUNGAN VOL SAT
VI. PEKERJAAN LANTAI
1 Pek. Lantai Keramik 40 x 40
1.83 1.50
1.) Loket Pendaftaran
KM / WC 2.) Ruang Tunggu
KM / WC
5

3.) Poli Gigi, Poli Umum, Ruang Inap 1 dan 2


1

1
2

2
.

4.) Ruang Tindakan


5.) Lab 1 dan 2, KIA
0.10 0.10 6.) Dapur
7.) KM/WC Umum
0.25 0.25
0
0

8.) Teras Belakang


.5
.5

0.20 0.20
1

9.) Kamar anak 2


2.00 1.68 10.) Dapur & ruang makan
1.68
125.11 M²
Luas Lantai Keramik 40x40
KM / WC
0

Luas = Luas Keseluruhan Lantai - Luas Lantai KM/WC


.0
2

= 136.21 - 11.09
= 125.11 M²
0.10 0.10

Luas Lantai Keramik 20x20


0.25 0.25
Luas = 11.09 M²
0
.50

.5

0.20 0.20
1

1.35 2.00
1.35
2 Pek. Lantai Keramik KM/WC 20 x 20 cm 0.20
KM / WC 0.20 0.25
.0
2 0

0.20

A.) KM/WC 1 dan 2


0.10
5.15 M²
1.) (1.83 x 2.15) x 2 = 7.87
0.25
0.20 2.) 1.50 x 2.15 = 3.23 +
L. pas Keramik = 5.00 M²

0.10
Faktor Keamanan = 3% x 5.00
= 0.15
0.25
0.20

Tot.Keb Keramik = 5.00 + 0.15


= 5.15 M²

3 Pek. Dinding Keramik KM/WC 20 x 25 cm


0.10
0.20

1.) KM/WC 1 dan 2


1.40 1.)1.68 + 0.76 = 6.44
2.) 2.00 + 2.00 + 1.35 + 0.43 = 5.78 +
12.22 M²
1
2
.9
1
.
99 2
.
19
1
.
99
0.56
0.80
0.80

9
1
.9
0.56

L. Pas Keramik Dinding = 12.22 x 1.50


= 18.33 M²

9
1
.9
Faktor Keamanan = 3% x 18.33
1.40 = 0.55 M²

9
Tot.Keb Keramik = 18.33 + 0.55

.1
2
= 18.88 M²
0.80
9
.9
1

0.56

4 Pek. List Dinding Keramik KM/WC 20x10 cm


9

1.) KM/WC (Kamar mandi utama)


.9
1

2.) KM/WC Umum


1.40 1.) 2.00 + 2.00 + 1.68 + 0.76 = 6.44
2.) 2.00 + 2.00 + 1.35 + 0.43 = 5.78 +
12.22 M²
9
.1
2

0.80

L. Pas Keramik Dinding = 12.22 x 0.10 1.26 M²


9

= 1.22 M²
.9
1

0.56

Faktor Keamanan = 3% x 1.22


9
.9
1

= 0.04 M²

Tot.Keb Keramik = 1.12 + 0.04


= 1.26 M²
Tot. Kebutuh Keramik KM/WC
Keramik 20 x 20 = 5.15
0.63 Keramik 20 x 25 = 18.88 25.29 M²
Keramik 20 x 10 = 1.26 +
25.29 M²
6
1
.3

URAIAN PEKERJAAN
PEKERJAAN KAYU, PENGANTUNG DAN
VII. PERHITUNGAN VOL SAT
PENGUNCI
1. Pekerjaan P1 Kaca ( panjang & luas) 1 buah

1.00

1.08 2 Daun pintu= 1.40 x 2,19


= 3.07 M² 3.07 M²

1.00
1.08
2. Pekerjaan P2 (panjang & luas) 15 buah
1 Daun pintu= 0.80 x 1.99
= 1.59

Tot 15 daun pintu= 1.59 x 15


=
Balok bubung ky besi 5/1023.88 M² 23.88 M²
Nok bubung genteng metal
Atap genteng metal
Reng ky matoa 3/4
Kasau ky matoa 5/7
Kaki kuda-kuda ky besi 6/12
30.0°
10.33
3. Pekerjaan P3 (panjang & luas) 1 buah 30.0°
10.33

1 Daun pintu= 0.56 x 1.99


= 1.11 M² 1.11 M²

Balok bubung ky besi 5/10


URAIAN PEKERJAAN
PEKERJAAN KAYU, PENGANTUNGbubung Nok DAN genteng metal
VIII. Atap genteng metal PERHITUNGAN VOL SAT
PENGUNCI
1 Pekerjaan J1 (panjang & luas) 2 buah Reng ky matoa 3/4
Kasau ky matoa 5/7
Kaki kuda-kuda ky besi 6/12
1 daun jendela= 0,63 x 1.63
= 1.03 M²

30.0°
Total 4 daun jendela= 1.03 x 4
7.12= 4.12 M² 4.12 M²

2 Pekerjaan J2 Loket (1 buah)

1 jendela full kaca= 1.00 x 1.08


= 1.08 M²

1.08 M²

3 Pekerjaan J 3 Loket dan Apotik (4 buah)


1 jendela full kaca= 1.00 x 1.08
= 1.08 M²

Total 4 jendela full kaca= 1.08 x 4


= 4.32 M² 4.32 M²

URAIAN PEKERJAAN
IX. GAMBAR DAN JENIS PEKERJAAN ATAP VOL SAT
1. Type Kuda-Kuda K1 (8 buah)
Panjang bangunan 10 + 1= 12.44 m
Lebar bangunan 13 + 1= 10.33 m
Derajat kemiringan cos 30= 0.154 m
Vol= ( P Bangunan + Overstek Genteng ) x ( L Bangunan + Overstek Genteng ) / Derajat Kemiringan Atap Genteng ( cos derajat )

L. Atap= 12.44 x 10.33 / 0.154


= 843 m²

Kebutuhan genteng metal (uk. 2×4)Lbr. 1.62 m²= L.Atap x 1.62


= 843 x 1.62
= 1365.66 Lembar

2. Type Kuda-Kuda K2 (2 buah)

URAIAN PEKERJAAN
X. GAMBAR DAN JENIS PEKERJAAN PERHITUNGAN VOL SAT
1. PEKERJAAN ATAP DAN PLAFOND
LUAS = LUASAN LANTAI (Luas lantai WC+Luas lantai)
TP= 136.21 M²

B = 0.05
H = 0.05
V= TP x B x H 0.34 M³
V= 136.21 x 0.05 x 0.05
V= 0.34 M³

Plafond Gypsumboard 9mm(1.20x2.40)= 0.26 x 136.21


Plafond Calsiboard t 6 mm (1.20x2.40)= 0.17 x 136.21
List Gypsumboard t 10 mm(1.20x2.40)= 0.29 x 136.21

Total Keb= 35.30


= 23.54
= 39.23 +
98.07 M³
2. Panjang Nok Seng Plat BJLS
Panjang = 43.32 M¹ 43.32 M¹

VI. GAMBAR DAN JENIS PEKERJAAN PERHITUNGAN VOL SAT


XI. PEKERJAAN PENGECETAN
1. Pek. Cat Dinding Tembok

Luasan Acian Dinding= 2.01 M² 2.01 M²

2. Pek. Cat Minyak Lisplang


T= 0.20
Panjang Lisplang= 42.25

L= T x PT
= 0.20 x 42.25
= 8.45 M² 8.45 M²

3. Pek. Cat Minyak Kayu Kusen


Panjang Kayu Kusen= 133.56
L Bidang Yg Dicat = 0.25

L= P x L
= 133.56 x 0.25
= 33.39 M² 33.39 M²
4. Pek. Cat Teak Oil/Politur Daun Pintu Kayu P1= 3.07
P2= 23.88
P3= 1.11
J1= 4.12
J2= 1.08 37.58 M²
J3= 4.32 +
37.58 M²
5. Pek. Cat List Gybsumboard

Panjang List Gypsum= 202.12 M²

URAIAN PEKERJAAN
NO GAMBAR DAN JENIS PEKERJAAN
PERHITUNGAN VOL SAT
XII. PEKERJAAN ELEKTRIKAL
1. Jumlah Titik Lampu, Saklar, & Stop Kontak

1. Pek. Lampu SL 24 Watt (Downlight)


= 19.00 19.00 Titik

2. Pek. Lampu SL 14 Watt


= 11.00 11.00 Titik

3. Pek. Saklar Tunggal


= 4.00 4.00 Titik

4. Pek. Saklar Ganda


= 8.00 8.00 Titik

5. Pek. Stop Kontak


= 7.00 7.00 Titik

6. Pek. KWH/Meteran
= 1.00 1.00 Unit
NO GAMBAR DAN JENIS PEKERJAAN
XIII. PEKERJAAN MEKANIKAL & SANITAIR PERHITUNGAN VOL SAT
Pek. Mekanikal
1. Pek. Pipa GIP dia. 1/2" Air Bersih

Pnjng Pipa GIP diameter


1/2" Air Bersih= 9.07
= 3.53
= 3.27
= 4.68 +
20.55 M¹ 20.55 M¹

2. Pek. Pipa PVC dia. 2" Pembuangan Air Bersih

Pnjng Pipa PVC diameter


2" Pembuangan Air Bersih= 6.60
0.55 +
7.15 M¹
7.15 M¹

3. Pek. Pipa PVC dia. 4" Pembuangan Air Kotor

Pnjng Pipa PVC diameter


4" Pembuangan Air Kotor= 6.12
0.32 +
6.44 M¹

6.44 M¹

4 Pek. Closed Jongkok


= 3.00 3.00 BH
5 Pek. Floor Drain
= 1.00 1.00 BH

6 Pek. Kran Air dia. 1/2"


= 4.00 4.00 BH
9.07
7. Pek. Septictank & Peresapan
= 2.00 2.00 BH

27
53

3
.
3
.

6
4
.8

2.20

2.20
0.5
2.20

0.32
1
6
.2
HARGA BAHAN DAN UPAH KERJA
KEGIATAN : Pembangunan Klinik
LOKASI : Kota Jayapura, Papua, Indonesia

A. HARGA BAHAN

NO NAMA BAHAN Satuan Harga di Lokasi


1 2 3 4
I. HARGA BAHAN LOKAL

A. KELOMPOK BAHAN BATU, PASIR, DAN TANAH


1. Batu Kali M³ Rp 510,000.00
2. Batu Kerikil M³ Rp 530,000.00
3. Batu Tela Bh Rp 3,850.00
4. Batu Kerawang Bh Rp 10,300.00
5. Paving Blok Bh Rp 5,000.00
6. Batu Alam Bh Rp 20,000.00
7. Sirtu M³ Rp 285,000.00
8. Batu Pecah :
a. Ukuran 1 - 2 cm M³ Rp 1,225,000.00
b. Ukuran 2 - 3 cm M³ Rp 1,145,000.00
c. Ukuran 3 - 5 cm M³ Rp 1,070,000.00
d. Ukuran 5 - 7 cm M³ Rp 990,500.00
9. Pasir Pasang M³ Rp 510,000.00
10. Pasir Beton M³ Rp 530,000.00
11. Pasir Urug M³ Rp 460,000.00
12. Tanah Timbunan/Urugan Pilihan M³ Rp 290,000.00
13. Karang Timbunan M³ Rp 320,000.00
14. Urugan Tanah Humus M³ Rp 430,000.00
B. KELOMPOK BAHAN KAYU
1. KAYU KELAS I (Kayu Besi)
a. Balok Kayu uk. 5 x 10 M³ Rp 5,100,000.00
b. Balok Kayu uk. 5 x 5 M³ Rp 5,100,000.00
c. Papan Kayu uk. 2 x 20 x 400 M³ Rp 5,100,000.00
d. Balok Kayu uk. 6 x 12 M³ Rp 5,100,000.00
2. KAYU KELAS II (Kayu Matoa)
a. Balok Kayu uk. 5 x 10 M³ Rp 2,950,000.00
b. Balok Kayu uk. 5 x 5 M³ Rp 2,950,000.00
c. Papan Kayu uk. 2 x 20 x 400 M³ Rp 2,950,000.00
d. Kayu Steger / Buah M³ Rp 2,400,000.00
e. Papan Bekisting M³ Rp 2,750,000.00
f. Kayu List Kaca Batang Rp 35,000.00
g. List Profil Kayu Batang Rp 51,000.00
II. HARGA BAHAN NON LOKAL

A. KELOMPOK BAHAN SEMEN DAN KERAMIK


1. Semen PC 50 Kg Zak Rp 99,900.00
2. Semen Warna Kg Rp 24,000.00
3. Keramik uk. 40 x 40 Bh Rp 25,000.00
4. Keramik uk. 20 x 20 Bh Rp 6,000.00
5. Keramik uk. 20 x 25 Bh Rp 6,325.00
6. Keramik uk. 20 x 10 Bh Rp 4,500.00
7. Ubin Plint uk. 10 x 40 Bh Rp 30,000.00
8. Ubin Homogeunes Tile 40/40 M² Rp 138,000.00
9. Ubin Homogeunes Tile 20/20 Type Castelo M² Rp 119,000.00
10. Ubin Homogeunes Tile 25/40 Type castelo Dos Rp 150,000.00
11. List Keramik Dinding 5/20 Motif Bh Rp 18,000.00
B. KELOMPOK BAHAN ATAP
1. Atap Multiroof Lbr Rp 50,000.00
2. Nok Multiroof Lbr Rp 20,000.00
3. Seng Plat BJLS 30 mm Lbr Rp 94,500.00
4. Seng Plat BJLS 20 mm Lbr Rp 68,500.00
5 Truss C75.75 SNI TASO Bh Rp 85,000.00
6 Reng 32.45 TASO Bh Rp 45,000.00
7 Skrup Kanal C (1.550)pcs Dus Rp 135,550.00
8 Skrup Genteng(1.550)pcs Dus Rp 80,500.00
9 Alumunium Foil Single (1m x 50m) Roll Rp 250,500.00
10 Alumunium Foil Double (1m x 50m) Roll Rp 280,500.00
C. KELOMPOK BAHAN PLAFOND
1. Tripleks 4 mm Lbr Rp 80,000.00
2. Tripleks 6 mm Lbr Rp 150,000.00
3. Multipleks 9 mm Lbr Rp 210,000.00
3. Teakwood uk. 122 x 244 Lbr Rp 185,000.00
4. Plafond Gypsum Board t. 9 mm
a. Rangka Hollow 4 x 4 M' Rp 36,000.00
b. Gypsum Board t. 9 mm Lbr Rp 114,000.00
c. Kasa Gypsum Roll Rp 48,000.00
d. Tepung Gypsum Kg Rp 21,600.00
e. Alkasit Kg Rp 600,000.00
f. Paku Skrup Bh Rp 840.00
g. Kawat Penggantung M' Rp 6,000.00
h. List Profil Cornees Gypsum M' Rp 50,000.00
i. List Profil Kayu 3-4 , 4 M M' Rp 36,000.00
5. Plafond Kalsiboard t. 3,5 mm Lbr Rp 108,000.00
NO NAMA BAHAN Satuan Harga di Lokasi
1 2 3 4

D. KELOMPOK BAHAN BESI


1. Besi Beton Polos Kg Rp 19,750.00
2. Besi Beton Ulir Kg Rp 19,950.00
3. Kawat Ikat Kg Rp 30,500.00
4. Kawat Duri Pagar Kg Rp 220,000.00
5. Kawat Harmonika T. 150 cm M¹ Rp 88,000.00
6. Besi Siku/Strip Kg Rp 19,000.00
7. Baja Tempa M' Rp 45,000.00
8. Profil Aluminium M' Rp 150,000.00

E. KELOMPOK BAHAN PIPA


1. PIPA GIP MEDIUM
a. Pipa GIP dia. 1/2" - 6 M Btg Rp 148,000.00
b. Pipa GIP dia. 3/4" - 6 M Btg Rp 187,200.00
c. Pipa GIP dia. 1" - 6 M Btg Rp 244,200.00
d. Pipa GIP dia. 2" - 6 M Btg Rp 414,500.00
e. Pipa GIP dia. 3" - 6 M Btg Rp 665,500.00
f. Pipa GIP dia. 4" - 6 M Btg Rp 895,000.00
g. Pipa GIP dia. 6" - 6 M Btg Rp 3,504,000.00
2. PIPA PVC AW
a. Pipa PVC dia. ½" Btg Rp 39,500.00
b. Pipa PVC dia. 1" Btg Rp 51,400.00
c. Pipa PVC dia. 1½" Btg Rp 67,400.00
d. Pipa PVC dia. 2" Btg Rp 99,500.00
e. Pipa PVC dia. 2½" Btg Rp 135,000.00
f. Pipa PVC dia. 3" Btg Rp 210,000.00
g. Pipa PVC dia. 4" Btg Rp 327,500.00
h. Pipa PVC dia. 6" Btg Rp 695,000.00
i. Pipa PVC dia. 8" Btg Rp 1,423,000.00

F. KELOMPOK BAHAN PAKU


1. Paku Campur Kg Rp 27,500.00
2. Paku Seng + Ring Karet Kg Rp 33,500.00
3. Paku Tripleks Kg Rp 29,500.00
4. Karet Paku Bh Rp 200.00
5. Skrup Fixer Bh Rp 700.00

G. KELOMPOK BAHAN KACA


1. Kaca Polos Bening 5 mm M² Rp 345,000.00
2. Kaca Polos Rayben 5 mm M² Rp 420,000.00
3. Kaca Polos Bening 12 mm M² Rp 550,000.00
4. Kaca Nako Rayben 5 mm + tralis 8 Klip Set Rp 325,000.00
5. Kaca Nako Rayben 5 mm + tralis 7 Klip Set Rp 284,000.00
6. Bahan Dinding Aluminium Composit Panel
a. Composit Panel m2 Rp 580,000.00
b. Hollow Alumunium 2 x 4 m1 Rp 51,600.00
c. Siku Alumunium 2 x 2 m1 Rp 12,000.00
d. Baut V 25 mm bh Rp 600.00
e. Spon tbl. 10 mm m2 Rp 21,600.00
f. Sealant tube Rp 42,000.00
H. KELOMPOK BAHAN ELEKTRIKAL
1. Lampu TL 2 x 40 watt Lengkap + Casing Bh Rp 131,500.00
2. Lampu TL 2 x 20 watt Lengkap + Casing Bh Rp 109,000.00
3. Lampu SL Philips 18 watt + fiting ulir Bh Rp 40,000.00
4. Lampu SL Philips 14 watt + fiting ulir Bh Rp 32,000.00
5. Lampu Tanam (Down laight) Philips SL 18 watt Set Rp 385,000.00
6. Lampu Hologen 500 Watt Set Rp 250,000.00
7. Kabel Listrik NYM 2 x 2,5 mm M¹ Rp 17,500.00
8. Stop Kontak Set Rp 34,500.00
9. Saklar Tunggal Bh Rp 34,500.00
10. Saklar Double Bh Rp 34,500.00
11. Sekring Khass 2 Group + ACC Bh Rp 67,000.00
12. Pipa kabel PVC ½" - 4 mm Btg Rp 28,000.00
13. Fitting Lampu Bh Rp 11,000.00
14. Kipas Exhaust Ceiling Bh Rp 975,000.00
15. Baut Bh Rp 350.00
16. Box Panel uk. 90 x 70 x 30 cm Unit Rp 8,021,000.00
17. Box Panel uk. 80 x 60 x 40 cm Unit Rp 7,112,300.00
18. Kabel NYY 4 x 70 mm² M' Rp 729,750.00
19. Kabel NYY 4 x 35 mm² M' Rp 143,000.00
20. Kabel 2 x NYA 2,5 mm² M' Rp 29,900.00
21. AC Spilit Wall 5 PK Unit Rp 23,100,000.00
22. AC Spilit Wall 2 PK Unit Rp 11,136,000.00
23. AC Spilit Wall 1,5 PK Unit Rp 7,930,800.00
24. AC Spilit Wall 1 PK Unit Rp 5,820,000.00
25. Lift Type VSM - 630 - C0105 Unit Rp 886,077,000.00
26. Hoisway Beam Unit Rp 18,800.00
NO NAMA BAHAN Satuan Harga di Lokasi
1 2 3 4
I. KELOMPOK BAHAN PENGUNCI/PENGGANTUNG
1. Kunci Tanam 2 Slaag Bh Rp 165,000.00
2. Kunci Tanam Silinder Bh Rp 165,000.00
3. Engsel Pintu ring nilon Kuningan Psg Rp 45,000.00
4. Engsel Jendela ring nilon Kuningan Psg Rp 16,800.00
5. Engsel Pintu Stainless Bh Rp 70,000.00
6. Engsel Jendela Stainless Bh Rp 60,000.00
7. Kunci Grendel Jendela Bh Rp 18,500.00
8. Door holder Bh Rp 30,000.00
9. Hak Angin Psg Rp 23,000.00
J. KELOMPOK BAHAN CAT
1. Cat Dinding Interior DULUX Kg Rp 125,000.00
2. Cat Dinding Exterior DULUX Kg Rp 131,000.00
3. Cat Plafond Tembok Kg Rp 26,800.00
4. Cat Kilat Kayu setara EMCO Kg Rp 61,500.00
5. Cat Besi Kg Rp 61,500.00
6. Cat Meni Kayu Kg Rp 30,200.00
7. Minyak Cat (Thineer) Ltr Rp 29,500.00
8. Residu Kg Rp 13,000.00
9. Teak Oil / Politur Ltr Rp 49,000.00
10. Plamur Tembok Kg Rp 30,000.00
11. Dempul Kayu Kg Rp 30,200.00
12. Amplas Lbr Rp 7,500.00
13. Kuwas Sedang Bh Rp 9,500.00
14. Lem Kayu Kg Rp 83,000.00
15. Karpet anti Selip M' Rp 360,000.00
16. Sealant Tube Rp 30,000.00
K. KELOMPOK BAHAN SANITAIR
1. Klosed Jongkok KIA Standar / Sejenis Bh Rp 630,000.00
2. Klosed Duduk KIA Standar / Sejenis Bh Rp 2,000,000.00
3. Wastafel lengkap Cermin Set Rp 2,200,000.00
4. Bak Cuci Aluminium + Asesoris Set Rp 945,000.00
5. Urinoir Porselin + Asesoris lengkap Set Rp 1,600,000.00
6. Kran Air Kepala Putih Bh Rp 74,000.00
7. Stop Kran Bh Rp 103,000.00
8. Floor Drain Stainlees Bh Rp 81,600.00
9. Mesin Pompa Air Sanyo + Asesories 450 Watt Unit Rp 2,520,000.00
10. Shell Tape Bh Rp 6,000.00
11. Bak Air Fiberglass 1 M³ Bh Rp 3,400,000.00
12. Bak Air Fiberglass 2000 ltr Bh Rp 6,100,000.00
13. Water Profing Kg Rp 16,000.00
14. Sewa Pipa Support Set Rp 16,000.00
15. Sewa Scafolding Set Rp 35,000.00
16. Jack Base + Clamp Bh Rp 15,000.00
17. Shower Spray Bh Rp 495,000.00
18. Hand Shower Bh Rp 750,000.00
19. Wastafel untuk Meja Bh Rp 260,000.00
20. Cermin T. 5 mm M² Rp 155,000.00
21. Shink Stainles Steel Bh Rp 530,000.00
22. Water Drain + Asesories Set Rp 98,500.00
23. Penggatung Tisu Bh Rp 190,000.00
24. Baut Bh Rp 500.00
25. Tempat Sabun Bh Rp 220,000.00
26. Air bersih Ltr Rp 600.00
27. Wastafel Bh Rp 1,824,000.00
28. Dop Pipa Penguras Bak Bh Rp 8,000.00

B. UPAH KERJA
NO URAIAN TENAGA Satuan UPAH KERJA
1 2 3 4

1 Kepala Tukang OH Rp 170,000.00


2 Mandor OH Rp 193,000.00
3 Pekerja OH Rp 95,000.00
4 Tukang OH Rp 155,000.00
5 Operator OH Rp 193,000.00
6 Asisten Operator OH Rp 155,000.00
RENCANA ANGGARAN BIAYA
KEGIATAN : Pembangunan Klinik
LOKASI : Kota Jayapura, Papua, Indonesia

HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6

I. PEKERJAAN PERSIAPAN 5,066,306.70


1. Pek. Pembersihan Lokasi 259.81 M² 19,500.00 5,066,306.70
2. Pek. Pengukuran dan Pemasangan Bouwplank 159.59 M¹ 83,400.00 13,309,806.00
18,376,112.70

JUMLAH I Rp 18,376,112.70
II. PEKERJAAN TANAH
1. Penggalian Tanah Pondasi 157.99 M³ 84,650.00 13,374,200.57
2. Tanah Urugan Hasil Galian Pondasi 41.89 M³ 28,870.00 1,209,432.87
3. Pasir Urug Bawah Pondasi 14.52 M³ 585,860.00 8,508,263.16
4. Pasir Urug Bawah Lantai 13.62 M³ 585,860.00 7,979,999.06
5. Penimbunan Pilihan Peninggian Lantai 19.02 M³ 375,860.00 7,150,285.47
6. Pas. Anstamping/Bt. Kosong 45.72 M³ 962,290.00 43,998,338.21
7. Pas. Pondasi Batu Kali 1 : 4 55.86 M³ 1,462,080.00 81,666,671.52
163,887,190.85

JUMLAH II Rp 163,887,190.85
III. PEKERJAAN BETON
1. Pek. Cor Sloof 25 x 15 5.98 M³ 7,352,790.00 44,003,690.85
2. Pek. Cor Kolom 15 x 15 2.95 M³ 10,720,720.00 31,604,682.56
3. Pek. Cor Ring Balok 15 x 20 5.98 M³ 16,819,870.00 100,660,614.50
4. Pek. Cor Lantai Bawah Keramik 5.45 M³ 1,352,860.00 7,370,922.42
5. Pek. Cor Lantai Dack Beton 3.07 M³ 9,797,810.00 30,098,872.32
6. Pek. Cor Meja Beton Wastafel Zing Aluminium 0.09 M³ 7,769,720.00 699,274.80
214,438,057.46

JUMLAH III Rp 214,438,057.46


IV. PEKERJAAN DINDING DAN LANTAI
1. Pek. Pasangan Batu Tela 1 : 4 534.63 M² 170,970.00 91,405,092.71
2. Pek. Plesteran Dinding 1 : 4 10.69 M² 81,840.00 875,076.66
3. Pek. Acian Dinding 5.35 M² 44,710.00 239,031.51
4. Pek. Lantai Keramik 40 x 40 125.11 M² 116,960.00 14,633,263.26
5. Pek. Lantai Keramik 20 x 20 (KM/WC) 5.15 M² 220,440.00 1,135,266.00
6. Pek. Dinding Keramik 20 x 25 (KM/WC) - M² 256,970.00 0.00
7. Pek. List Dinding Keramik 10 x 20 (KM/WC) 1.26 M' 349,293.80 439,621.18
108,727,351.31

JUMLAH IV Rp 108,727,351.31
V. PEKERJAAN KAYU, PENGGANTUNG & PENGUNCI
1. Pek. Kusen Pintu, Jendela & Ventilasi Ky. Besi 6/12 133.56 M³ 9,836,020.00 1,313,698,831.20
2. Pek. Daun Pintu Pani Kayu 89.50 M² 832,450.00 74,504,275.00
3. Pek. Jendela Panil Kaca 44.06 M² 1,078,860.00 47,534,571.60
4. Pek. Engsel Pintu 24 Psg 70,290.00 1,686,960.00
5. Pek. Engsel Jendela 27 Psg 34,450.00 930,150.00
6. Pek. Kunci Pintu Double 2 Bh 239,250.00 478,500.00
7. Pek. Kunci Tanam 2 Slaag 8 Bh 239,250.00 1,914,000.00
8. Pek. Grendel Jendela 12 Bh 102,810.00 1,233,720.00
9. Pek. Hak Kait Angin 24 Bh 107,310.00 2,575,440.00
1,444,556,447.80

JUMLAH V Rp 1,444,556,447.80
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6

VI. PEKERJAAN ATAP & PLAFOND


1. Pek. Kuda-Kuda Ky. Besi 6/12 2.56 M³ 186,600.00 476,930.94
2. Pek. Gording Ky. Besi 6/12 1.35 M³ 111,960.00 151,392.31
3. Pek. Kasau Ky. Besi 5/7 + Reng Ky. Besi 3/4 194.92 M² 1,555.00 303,103.71
4. Pek. Atap Multiroof 194.92 M² 1,555.00 303,103.71
5. Pek. Nok Seng Multiroof 22.85 M' 2,332.50 53,297.63
6. Pek. Lisplang Ky Besi Papan 2x 2/20 15.86 M² 3,421.00 54,257.06
7. Pek. Talang Seng Lapis Papan Kayu 8.24 M' 3,887.50 32,033.00
8. Pek. Rangka Plafond Ky. Besi 5 x 5 192.83 M² 4,665.00 899,551.95
9. Pek. Plafond Gypsumboard T 9 mm 156.35 M² 5,753.50 899,559.73
10. Pek. Plafond Calsiboard t 6 mm 36.48 M² 5,753.50 209,887.68
11. Pek. List Gypsumboard t 10 mm 148.91 M' 933.00 138,933.03
12. Pek. List Kayu Besi t 5 mm 92.59 M' 777.50 71,988.73
3,594,039.47

JUMLAH VI Rp 3,594,039.47
VII. PEKERJAAN PENGECETAN
1. Pek. Cat Dinding Tembok 2.01 M² 60,560.00 121,442.94
2. Pek. Cat Minyak Lisplang Kayu 8.45 M² 60,600.00 512,070.00
3. Pek. Cat Minyak Kayu Kusen 33.39 M² 60,600.00 2,023,434.00
4. Pek. Cat Teak Oil/Politur Daun Pintu Kayu + Jendela 32.18 M² 66,640.00 2,144,501.86
5. Pek. Cat Plafond 136.21 M² 22,530.00 3,068,752.72
6. Pek. Cat List Gybsumboard 11.11 M² 22,530.00 250,326.32
7. Pek. Cat Minyak Listplnk Kayu 8.45 M² 60,600.00 512,070.00
8,632,597.84
JUMLAH VII Rp 8,632,597.84
VIII. PEKERJAAN ELEKTRIKAL
1. Pek. Lampu SL 24 Watt (Down Light) 19.00 Ttik 756,350.00 14,370,650.00
2. Pek. Lampu SL 14 Watt 11.00 Ttik 411,350.00 4,524,850.00
3. Pek. Saklar Tunggal 4.00 Ttik 286,420.00 1,145,680.00
4. Pek. Saklar Ganda 8.00 Ttik 286,420.00 2,291,360.00
5. Pek. Stop Kontak 7.00 Ttik 286,420.00 2,004,940.00
6. Pek. Kwh/Meteran 1.00 Unit 4,000,000.00 4,000,000.00
28,337,480.00

JUMLAH VIII Rp 28,337,480.00


Pekerjaan Mekanikal
1. Pek. Pipa GIP dia. 1/2" Air Bersih - M' 62,890.00 0.00
2. Pek. Pipa PVC dia. 2" Pembuangan Air Bersih 7.15 M' 69,140.00 494,351.00
3. Pek. Pipa PVC dia. 4" Pembuangan Air Kotor 6.44 M' 157,490.00 1,014,235.60
Pekerjaan Sanitair
1. Klosed Duduk KIA Standar / Sejenis 3.00 Bh 2,000,000.00 6,000,000.00
2. Pek. Kran Air dia. 1/2" 5.00 Bh 93,340.00 466,700.00
3. Pek. Washtafel Zing Aluminium 1.00 Bh 260,000.00 260,000.00
4. Pek. Septictank & Peresapan 2.00 Unit 4,548,321.90 9,096,643.79
17,331,930.39
JUMLAH IX Rp 17,331,930.39
X. PEKERJAAN AKHIR
1. Pek. Pembersihan Akhir 1.00 Ls 1,000,000.00
1,000,000.00

JUMLAH X Rp 1,000,000.00

REAL COST Rp 2,008,881,207.81


PEMBULATAN Rp 2,008,881,000.00
ANALISA HARGA SATUAN
KEGIATAN :Pembangunan Klinik
LOKASI : Jayapura, Papua, Indonesia

HARGA SATUAN JUMLAH


No. URAIAN PEKERJAAN ANALISA SATUAN BAHAN/UPAH HARGA
(Rp) (Rp)
1 2 3 4 5 6

# PEKERJAAN PERSIAPAN

1. 1 M² Pembersihan Lokasi
SNI No. 6.1 ~ Pekerja 0.1000 H/o 107,000.00 10,700.00
2835-2002 ~ Mandor 0.0500 H/o 176,000.00 8,800.00
JUMLAH 19,500.00
DIBULATKAN 19,500.00
2. 1 M¹ Pagar Sementara dari Seng Gel. T. 2 m
SNI No. 6.2 ~ Dolken Kayu Buah 1.2500 Btg 68,571.43 85,714.29
2835-2002 ~ Semen PC 2.5000 Kg 1,800.00 4,500.00
~ Seng Gelombang BJLS. 20 1.2000 Lbr 68,500.00 82,200.00
~ Pasir Beton 0.0050 M³ 530,000.00 2,650.00
~ Koral Beton 0.0090 M³ 285,000.00 2,565.00
~ Kayu Kls. II 0.0720 M³ 2,950,000.00 212,400.00
~ Paku Campur 0.0600 Kg 27,500.00 1,650.00
~ Meni Besi 0.4500 Kg 30,200.00 13,590.00
~ Pekerja 0.2000 H/o 107,000.00 21,400.00
~ Tukang 0.4000 H/o 141,500.00 56,600.00
~ Kepala Tukang 0.0200 H/o 155,500.00 3,110.00
~ Mandor 0.0200 H/o 176,000.00 3,520.00
JUMLAH 489,899.29
DIBULATKAN 489,890.00
3. 1 M¹ Pengukuran dan Pemasangan Bouwplank
SNI No. 6.4 ~ Kayu Papan 3/20 0.0070 M³ 2,950,000.00 20,650.00
2835-2002 ~ Kayu Skoor 5/7 0.0120 M³ 2,950,000.00 35,400.00
~ Paku Campur 0.0200 Kg 27,500.00 550.00
~ Tukang Kayu 0.1000 H/o 141,500.00 14,150.00
~ Kepala Tukang Kayu 0.0100 H/o 107,000.00 1,070.00
~ Pekerja 0.1000 H/o 107,000.00 10,700.00
~ Mandor 0.0050 H/o 176,000.00 880.00
JUMLAH 83,400.00
DIBULATKAN 83,400.00
# PEKERJAAN TANAH DAN PASIR

4. 1 M³ Galian Tanah Biasa sedalam 1 M


SNI No. 6.1 ~ Pekerja 0.7500 H/o 107,000.00 80,250.00
2836-2008 ~ Mandor 0.0250 H/o 176,000.00 4,400.00
JUMLAH 84,650.00
DIBULATKAN 84,650.00
5. 1 M³ Galian Tanah Biasa sedalam 2 M
SNI No. 6.2 ~ Pekerja 0.9000 H/o 107,000.00 96,300.00
2836-2008 ~ Mandor 0.0450 H/o 176,000.00 7,920.00
JUMLAH 104,220.00
DIBULATKAN 104,220.00
6. 1 M³ Pembuangan Tanah sejauh 150 M
SNI No. 6.8 ~ Pekerja 0.5160 H/o 107,000.00 55,212.00
2835-2002 ~ Mandor 0.0500 H/o 176,000.00 8,800.00
JUMLAH 64,012.00
DIBULATKAN 64,010.00
7. 1 M³ Urugan Kembali Galian Tanah
SNI No. 6.9 ~ Pekerja 0.1333 H/o 107,000.00 14,263.10
2836-2008 ~ Mandor 0.0830 H/o 176,000.00 14,608.00
JUMLAH 28,871.10
DIBULATKAN 28,870.00
8. 1 M³ Urugan Pasir
SNI No. 6.11 ~ Pasir Urug 1.2000 M³ 460,000.00 552,000.00
2836-2008 ~ Pekerja 0.3000 H/o 107,000.00 32,100.00
~ Mandor 0.0100 H/o 176,000.00 1,760.00
JUMLAH 585,860.00
DIBULATKAN 585,860.00
9. 1 M³ Urugan Sirtu
SNI No. 6.15 ~ Urugan Sirtu 1.2000 M³ 285,000.00 342,000.00
2836-2008 ~ Pekerja 0.3000 H/o 107,000.00 32,100.00
~ Mandor 0.0100 H/o 176,000.00 1,760.00
JUMLAH 375,860.00
DIBULATKAN 375,860.00

HARGA SATUAN JUMLAH


No. URAIAN PEKERJAAN ANALISA SATUAN BAHAN/UPAH HARGA
(Rp) (Rp)
1 2 3 4 5 6
10. 1 M³ Urugan Tanah Humus
SNI No. 6.15 ~ Urugan Tanah Humus 1.2000 M³ 430,000.00 516,000.00
2836-2008 ~ Pekerja 0.3000 H/o 107,000.00 32,100.00
~ Mandor 0.0100 H/o 176,000.00 1,760.00
JUMLAH 549,860.00
DIBULATKAN 549,860.00
# PEKERJAAN PASANGAN PONDASI

11. 1 M³ Pasangan Pondasi Batu Kosong (Aanstamping)


SNI No. 6.9 ~ Batu Belah 15/20 cm 1.2000 M³ 510,000.00 612,000.00
2836-2008 ~ Pasir Urug 0.4320 M³ 460,000.00 198,720.00
~ Pekerja 0.7800 H/o 107,000.00 83,460.00
~ Tukang 0.3900 H/o 141,500.00 55,185.00
~ Kepala Tukang 0.0390 H/o 155,500.00 6,064.50
~ Mandor 0.0390 H/o 176,000.00 6,864.00
JUMLAH 962,293.50
DIBULATKAN 962,290.00
12. 1 M³ Pasangan Pondasi Batu Kali
SNI No. 6.2 Campuran 1 Pc : 4 Psr
2836-2008 ~ Batu Belah 15/20 cm 1.2000 M³ 510,000.00 612,000.00
~ Sement PC 163.0000 Kg 1,800.00 293,400.00
~ Pasir Pasang 0.5200 M³ 510,000.00 265,200.00
~ Pekerja 1.5000 H/o 107,000.00 160,500.00
~ Tukang 0.7500 H/o 141,500.00 106,125.00
~ Kepala Tukang 0.0750 H/o 155,500.00 11,662.50
~ Mandor 0.0750 H/o 176,000.00 13,200.00
JUMLAH 1,462,087.50
DIBULATKAN 1,462,080.00
# PEKERJAAN PASANGAN DINDING

13. 1 M² Pasangan Dinding Batu Tela


SNI No. 6.16 Campuran 1 Pc : 2 Psr
6897-2008 ~ Batu Tela 20.000 Bh 3,850.00 77,000.00
~ Sement PC 19.000 Kg 1,800.00 34,200.00
~ Pasir Pasang 0.038 M³ 510,000.00 19,380.00
~ Pekerja 0.300 H/o 107,000.00 32,100.00
~ Tukang 0.100 H/o 141,500.00 14,150.00
~ Kepala Tukang 0.010 H/o 155,500.00 1,555.00
~ Mandor 0.015 H/o 176,000.00 2,640.00
JUMLAH 181,025.00
DIBULATKAN 181,020.00
14. 1 M² Pasangan Dinding Batu Tela Tidur
SNI No. 6.16 Campuran 1 Pc : 3 Psr
6897-2008 ~ Batu Tela 52.300 Bh 3,850.00 201,355.00
~ Sement PC 32.950 Kg 1,800.00 59,310.00
~ Pasir Pasang 0.073 M³ 510,000.00 37,230.00
~ Pekerja 0.350 H/o 107,000.00 37,450.00
~ Tukang 0.150 H/o 141,500.00 21,225.00
~ Kepala Tukang 0.015 H/o 155,500.00 2,332.50
~ Mandor 0.018 H/o 176,000.00 3,168.00
JUMLAH 362,070.50
DIBULATKAN 362,070.00
15. 1 M² Pasangan Dinding Batu Tela
SNI No. 6.17 Campuran 1 Pc : 4 Psr
6897-2008 ~ Batu Tela 20.000 Bh 3,850.00 77,000.00
~ Sement PC 12.0000 Kg 1,800.00 21,600.00
~ Pasir Pasang 0.043 M³ 510,000.00 21,930.00
~ Pekerja 0.300 H/o 107,000.00 32,100.00
~ Tukang 0.100 H/o 141,500.00 14,150.00
~ Kepala Tukang 0.010 H/o 155,500.00 1,555.00
~ Mandor 0.015 H/o 176,000.00 2,640.00
JUMLAH 170,975.00
DIBULATKAN 170,970.00
# PEKERJAAN PLESTERAN
16. 1 M² Plesteran Tebal 15 mm
SNI No. 6.2 Campuran 1 Pc : 2 Psr
2837-2008 ~ Sement PC 10.2240 Kg 1,800.00 18,403.20
~ Pasir Pasang 0.0200 M³ 510,000.00 10,200.00
~ Pekerja 0.3840 H/o 107,000.00 41,088.00
~ Tukang 0.1500 H/o 141,500.00 21,225.00
~ Kepala Tukang 0.0150 H/o 155,500.00 2,332.50
~ Mandor 0.0150 H/o 176,000.00 2,640.00
JUMLAH 95,888.70
DIBULATKAN 95,880.00
HARGA SATUAN JUMLAH
No. URAIAN PEKERJAAN ANALISA SATUAN BAHAN/UPAH HARGA
(Rp) (Rp)
1 2 3 4 5 6
17. 1 M² Plesteran Tebal 15 mm
SNI No. 6.3 Campuran 1 Pc : 4 Psr
2837-2008 ~ Sement PC 6.2800 Kg 1,800.00 11,304.00
~ Pasir Pasang 0.0240 M³ 510,000.00 12,240.00
~ Pekerja 0.3000 H/o 107,000.00 32,100.00
~ Tukang 0.1500 H/o 141,500.00 21,225.00
~ Kepala Tukang 0.0150 H/o 155,500.00 2,332.50
~ Mandor 0.0150 H/o 176,000.00 2,640.00
JUMLAH 81,841.50
DIBULATKAN 81,840.00
18. 1 M² Acian Dinding Batu Tela
SNI No. 6.27 ~ Sement PC 3.2500 Kg 1,800.00 5,850.00
2837-2008 ~ Pekerja 0.2000 H/o 107,000.00 21,400.00
~ Tukang 0.1000 H/o 141,500.00 14,150.00
~ Kepala Tukang 0.0100 H/o 155,500.00 1,555.00
~ Mandor 0.0100 H/o 176,000.00 1,760.00
JUMLAH 44,715.00
DIBULATKAN 44,710.00
# PEKERJAAN BETON

19. 1 M³ Membuat Beton Mutu f'c : 7,4 Mpa (K100)


SNI No. 6.1 ~ Sement PC 247.0000 Kg 1,800.00 444,600.00
7394-2008 ~ Pasir Beton 0.4340 M³ 530,000.00 230,020.00
~ Kerikil Beton 0.5940 M³ 530,000.00 314,820.00
~ Air 215.000 Ltr 600.00 129,000.00
~ Pekerja 1.6500 H/o 107,000.00 176,550.00
~ Tukang 0.2750 H/o 141,500.00 38,912.50
~ Kepalla Tukang 0.0280 H/o 155,500.00 4,354.00
~ Mandor 0.0830 H/o 176,000.00 14,608.00
JUMLAH 1,352,864.50
DIBULATKAN 1,352,860.00
20. 1 M³ Membuat Beton Mutu f'c : 19,3 Mpa (K225)
SNI No. 6.1 ~ Sement PC 371.0000 Kg 1,800.00 667,800.00
7394-2008 ~ Pasir Beton 0.3490 M³ 530,000.00 184,970.00
~ Kerikil/Batu Pecah uk. 2 - 3 cm 0.6220 M³ 1,145,000.00 712,190.00
~ Air 215.000 Ltr 600.00 129,000.00
~ Pekerja 1.6500 H/o 107,000.00 176,550.00
~ Tukang 0.2750 H/o 141,500.00 38,912.50
~ Kepalla Tukang 0.0280 H/o 155,500.00 4,354.00
~ Mandor 0.0830 H/o 176,000.00 14,608.00
JUMLAH 1,928,384.50
DIBULATKAN 1,928,380.00
21. 1 Kg Pembesian dengan Besi Polos/Ulir
SNI No. 6.17 ~ Besi Beton Polos/Ulir 1.0500 Kg 19,750.00 20,737.50
7394-2008 ~ Kawat Beton 0.0150 Kg 30,500.00 457.50
~ Pekerja 0.0070 H/o 107,000.00 749.00
~ Tukang 0.0070 H/o 141,500.00 990.50
~ Kepalla Tukang 0.0007 H/o 155,500.00 108.85
~ Mandor 0.0004 H/o 176,000.00 70.40
JUMLAH 23,113.75
DIBULATKAN 23,110.00
22. 1 M² Memasang Bekisting untuk Pondasi
SNI No. 6.2 ~ Kayu Matoa 0.0400 M³ 2,950,000.00 118,000.00
7394-2008 ~ Paku Campur 0.1500 Kg 27,500.00 4,125.00
~ Pekerja 0.5200 H/o 107,000.00 55,640.00
~ Tukang 0.2600 H/o 141,500.00 36,790.00
~ Kepalla Tukang 0.0260 H/o 155,500.00 4,043.00
~ Mandor 0.0260 H/o 176,000.00 4,576.00
JUMLAH 223,174.00
DIBULATKAN 223,170.00
23. 1 M² Pasang Bekisting Sloof
~ Kayu Begisting 0.0450 M³ 2,400,000.00 108,000.00
~ Paku Campur 0.3000 Kg 27,500.00 8,250.00
~ Pekerja 0.5200 H/o 107,000.00 55,640.00
~ Tukang 0.2600 H/o 141,500.00 36,790.00
~ Kepalla Tukang 0.0260 H/o 155,500.00 4,043.00
~ Mandor 0.0260 H/o 176,000.00 4,576.00
JUMLAH 217,299.00
DIBULATKAN 217,290.00
24. 1 M² Bekisting Kolom
~ Kayu Begisting 0.0400 M³ 2,400,000.00 96,000.00
~ Paku Campur 0.4000 Kg 27,500.00 11,000.00
~ Balok Kayu 0.0150 M³ 2,950,000.00 44,250.00
~ Tripleks 9 mm 0.3500 Lbr 210,000.00 73,500.00
~ Pekerja 0.3000 H/o 107,000.00 32,100.00
~ Tukang 0.2600 H/o 141,500.00 36,790.00
~ Kepalla Tukang 0.0260 H/o 155,500.00 4,043.00
~ Mandor 0.0050 H/o 176,000.00 880.00
JUMLAH 298,563.00
DIBULATKAN 298,560.00
25. 1 M² Memasang Bekisting untuk Balok
SNI No. 6.23 ~ Kayu Matoa 0.0400 M³ 2,950,000.00 118,000.00
7394-2008 ~ Paku Campur 0.2000 Kg 27,500.00 5,500.00
~ Multiplek 9 mm 0.3500 Lbr 210,000.00 73,500.00
~ Sewa Scafolding 1.0000 Set 35,000.00 35,000.00
~ Pekerja 0.6600 H/o 107,000.00 70,620.00
~ Tukang 0.3300 H/o 141,500.00 46,695.00
~ Kepalla Tukang 0.0330 H/o 155,500.00 5,131.50
~ Mandor 0.0330 H/o 176,000.00 5,808.00
JUMLAH 360,254.50
DIBULATKAN 360,250.00
26. 1 M² Bekisting Dinding
~ Kayu Matoa 0.0300 M³ 2,950,000.00 88,500.00
~ Paku Campur 0.2000 Kg 27,500.00 5,500.00
~ Sewa Pipa Support 1.0000 Set 16,000.00 16,000.00
~ Tripleks 9 mm 0.3500 Lbr 210,000.00 73,500.00
~ Jack Base + Clamp 1.0000 Bh 15,000.00 15,000.00
~ Pekerja 0.3000 H/o 107,000.00 32,100.00
~ Tukang 0.2600 H/o 141,500.00 36,790.00
~ Kepalla Tukang 0.0260 H/o 155,500.00 4,043.00
~ Mandor 0.0050 H/o 176,000.00 880.00
JUMLAH 272,313.00
DIBULATKAN 272,310.00
27. 1 M² Bekisting Plat Lantai
~ Kayu Begisting 0.0400 M³ 2,400,000.00 96,000.00
~ Paku Campur 0.4000 Kg 27,500.00 11,000.00
~ Balok Kayu 0.0150 M³ 2,950,000.00 44,250.00
~ Tripleks 9 mm 0.3500 Lbr 210,000.00 73,500.00
~ Pekerja 0.3200 H/o 107,000.00 34,240.00
~ Tukang 0.3300 H/o 141,500.00 46,695.00
~ Kepalla Tukang 0.0330 H/o 155,500.00 5,131.50
~ Mandor 0.0060 H/o 176,000.00 1,056.00
JUMLAH 311,872.50
DIBULATKAN 311,870.00
28. 1 M² Memasang Bekisting untuk Tangga
SNI No. 6.26 ~ Kayu Matoa 0.0300 M³ 2,950,000.00 88,500.00
7394-2008 ~ Paku Campur 0.4000 Kg 27,500.00 11,000.00
~ Multiplek 9 mm 0.3500 Lbr 210,000.00 73,500.00
~ Sewa Pipa Support 1.0000 Set 16,000.00 16,000.00
~ Pekerja 0.6600 H/o 107,000.00 70,620.00
~ Tukang 0.3300 H/o 141,500.00 46,695.00
~ Kepalla Tukang 0.0330 H/o 155,500.00 5,131.50
~ Mandor 0.0330 H/o 176,000.00 5,808.00
JUMLAH 317,254.50
DIBULATKAN 317,250.00
29. 1 M³ Membongkar Cetakan
~ Pekerja 4.0000 H/o 107,000.00 428,000.00
JUMLAH 428,000.00
DIBULATKAN 428,000.00
HARGA SATUAN JUMLAH
No. URAIAN PEKERJAAN ANALISA SATUAN BAHAN/UPAH HARGA
(Rp) (Rp)
1 2 3 4 5 6
30. 1 M³ Beton Pondasi Poer Plat (K225)
~ Beton K225 1.0000 M³ 1,928,380.00 1,928,380.00
~ Pembesian 246.8278 Kg 23,110.00 5,704,190.02
~ Begisting Pondasi 1.8461 M² 223,170.00 411,992.95
JUMLAH 8,044,562.97
DIBULATKAN 8,044,560.00
31. 1 M³ Cor Sloof (K225)
~ Beton K225 1.0000 M³ 1,928,380.00 1,928,380.00
~ Pembesian 167.1851 Kg 23,110.00 3,863,647.05
~ Begisting Sloof 7.1829 M² 217,290.00 1,560,770.35
JUMLAH 7,352,797.41
DIBULATKAN 7,352,790.00
32. 1 M³ Cor Kolom (K225)
~ Beton K225 1.0000 M³ 1,928,380.00 1,928,380.00
~ Pembesian 208.2019 Kg 23,110.00 4,811,544.80
~ Begisting Kolom 13.3333 M² 298,560.00 3,980,800.00
JUMLAH 10,720,724.80
DIBULATKAN 10,720,720.00
33. 1 M³ Cor Kolom Praktis 15 x 15 (K175)
~ Beton K100 1.0000 M³ 1,352,860.00 1,352,860.00
~ Pembesian 110.0000 Kg 23,110.00 2,542,100.00
~ Begisting Kolom 13.3333 M² 298,560.00 3,980,800.00
JUMLAH 7,875,760.00
DIBULATKAN 7,875,760.00
34. 1 M³ Cor Beton Balok (K225)
~ Beton K225 1.0000 M³ 1,928,380.00 1,928,380.00
~ Pembesian 183.1246 Kg 23,110.00 4,232,009.37
~ Begisting Balok 14.5918 M² 360,250.00 5,256,681.65
JUMLAH 11,417,071.02
DIBULATKAN 11,417,070.00
35. 1 M³ Cor Beton Rinkbalk 15 x 15 (K225)
~ Beton K225 1.0000 M³ 1,928,380.00 1,928,380.00
~ Pembesian 196.8119 Kg 23,110.00 4,548,321.90
~ Begisting Balok 28.7111 M² 360,250.00 10,343,177.78
JUMLAH 16,819,879.67
DIBULATKAN 16,819,870.00
36. 1 M³ Cor Plat Lantai dasar T. 12 cm (K225)
~ Beton K225 1.0000 M³ 1,928,380.00 1,928,380.00
~ Pembesian 197.7634 Kg 23,110.00 4,570,312.51
~ Begisting 0.7390 M² 311,870.00 230,471.93
~ Pembongkaran Bekisting 0.0060 M³ 428,000.00 2,568.00
JUMLAH 6,731,732.44
DIBULATKAN 6,731,730.00
37. 1 M³ Cor Plat Lantai T. 12 cm (K225)
~ Beton K225 1.0000 M³ 1,928,380.00 1,928,380.00
~ Pembesian 197.7634 Kg 23,110.00 4,570,312.51
~ Begisting 9.2336 M² 311,870.00 2,879,686.06
~ Pembongkaran Bekisting 0.9800 M³ 428,000.00 419,440.00
JUMLAH 9,797,818.56
DIBULATKAN 9,797,810.00
38. 1 M³ Cor Plat Lantai T. 10 cm (K225)
~ Beton K225 1.0000 M³ 1,928,380.00 1,928,380.00
~ Pembesian 110.0000 Kg 23,110.00 2,542,100.00
~ Begisting 9.2340 M² 311,870.00 2,879,807.58
~ Pembongkaran Bekisting 0.9800 M³ 428,000.00 419,440.00
JUMLAH 7,769,727.58
DIBULATKAN 7,769,720.00
39. 1 M³ Cor Beton Plat Tangga T. 12 cm (K225)
~ Beton K225 1.0000 M³ 1,928,380.00 1,928,380.00
~ Pembesian 150.0000 Kg 23,110.00 3,466,500.00
~ Begisting 8.3330 M² 311,870.00 2,598,812.71
~ Pembongkaran Bekisting 2.5000 M³ 428,000.00 1,070,000.00
JUMLAH 9,063,692.71
DIBULATKAN 9,063,690.00
40. 1 M³ Cor Beton Listplank 12/40 (K225)
~ Beton K225 1.0000 M³ 1,928,380.00 1,928,380.00
~ Pembesian 110.0000 Kg 23,110.00 2,542,100.00
~ Begisting Balok 6.0000 M² 360,250.00 2,161,500.00
JUMLAH 6,631,980.00
DIBULATKAN 6,631,980.00
41. 1 M³ Cor Listplank Beton T. 12 cm (K225)
~ Beton K225 1.0000 M³ 1,928,380.00 1,928,380.00
~ Pembesian 324.7778 Kg 23,110.00 7,505,614.44
~ Begisting 25.0000 M² 360,250.00 9,006,250.00
~ Pembongkaran Bekisting 1.5000 M³ 428,000.00 642,000.00
JUMLAH 19,082,244.44
DIBULATKAN 19,082,240.00

# PEKERJAAN PELAPIS LANTAI DAN DINDING

42. 1 M² Pasang Lantai Ubin Keramik 40/40


SNI No. 6.1 ~ Ubin Keramik uk. 40/40 6.6300 Bh 4,166.67 27,625.00
7395-2008 ~ Semen PC 9.8000 Kg 1,800.00 17,640.00
~ Pasir Pasang 0.0450 M³ 510,000.00 22,950.00
~ Pekerja 0.2500 H/o 107,000.00 26,750.00
~ Tukang 0.1250 H/o 141,500.00 17,687.50
~ Kepalla Tukang 0.0130 H/o 155,500.00 2,021.50
~ Mandor 0.0130 H/o 176,000.00 2,288.00
JUMLAH 116,962.00
DIBULATKAN 116,960.00
HARGA SATUAN JUMLAH
No. URAIAN PEKERJAAN ANALISA SATUAN BAHAN/UPAH HARGA
(Rp) (Rp)
1 2 3 4 5 6
43. 1 M² Pasang Lantai Ubin Keramik 30/30
SNI No. 6.2 ~ Ubin Keramik uk. 30/30 11.8700 Bh 10,454.55 124,095.45
7395-2008 ~ Semen PC 10.0000 Kg 1,800.00 18,000.00
~ Pasir Pasang 0.0450 M³ 510,000.00 22,950.00
~ Pekerja 0.2600 H/o 107,000.00 27,820.00
~ Tukang 0.1300 H/o 141,500.00 18,395.00
~ Kepalla Tukang 0.0130 H/o 155,500.00 2,021.50
~ Mandor 0.0130 H/o 176,000.00 2,288.00
JUMLAH 215,569.95
DIBULATKAN 215,560.00
44. 1 M² Pasang Lantai Ubin Keramik 20/20
SNI No. 6.3 ~ Ubin Keramik uk. 20/20 26.5000 Bh 4,200.00 111,300.00
7395-2008 ~ Semen PC 10.4000 Kg 1,800.00 18,720.00
~ Pasir Pasang 0.0450 M³ 510,000.00 22,950.00
~ Pekerja 0.2700 H/o 107,000.00 28,890.00
~ Tukang 0.1350 H/o 141,500.00 19,102.50
~ Kepalla Tukang 0.0130 H/o 155,500.00 2,021.50
~ Mandor 0.0130 H/o 176,000.00 2,288.00
JUMLAH 205,272.00
DIBULATKAN 205,270.00
45. 1 M² Pasang Lantai Ubin 20/20
SNI No. 6.1 ~ Ubin uk. 20/20 Type Castelo 26.5000 Bh 4,760.00 126,140.00
7395-2008 ~ Semen PC 10.4000 Kg 1,800.00 18,720.00
~ Pasir Pasang 0.0450 M³ 510,000.00 22,950.00
~ Pekerja 0.2700 H/o 107,000.00 28,890.00
~ Tukang 0.1350 H/o 141,500.00 19,102.50
~ Kepalla Tukang 0.0140 H/o 155,500.00 2,177.00
~ Mandor 0.0140 H/o 176,000.00 2,464.00
JUMLAH 220,443.50
DIBULATKAN 220,440.00
46. 1 M² Pasang Dinding Keramik Homogeunes Tile 20/25
SNI No. 6.1 ~ Keramik Homogeunes Tile uk. 20/25 Type Cas 1.0000 M² 80,000.00 80,000.00
7395-2008 ~ Semen PC 10.0000 Kg 1,800.00 18,000.00
~ Pasir Pasang 0.0450 M³ 510,000.00 22,950.00
~ Pekerja 0.7000 H/o 107,000.00 74,900.00
~ Tukang 0.3500 H/o 141,500.00 49,525.00
~ Kepalla Tukang 0.0350 H/o 155,500.00 5,442.50
~ Mandor 0.0350 H/o 176,000.00 6,160.00
JUMLAH 256,977.50
DIBULATKAN 256,970.00
47. 1 M² Pasang Dinding Keramik 25/40 Type castelo
SNI No. 6.54 ~ Ubin Keramik uk. 25/40 Type Castelo 1.0000 M² 150,000.00 150,000.00
7395-2008 ~ Semen PC 9.3000 Kg 1,800.00 16,740.00
~ Pasir Pasang 0.0180 M³ 510,000.00 9,180.00
~ Pekerja 0.9000 H/o 107,000.00 96,300.00
~ Tukang 0.4500 H/o 141,500.00 63,675.00
~ Kepalla Tukang 0.0450 H/o 155,500.00 6,997.50
~ Mandor 0.0450 H/o 176,000.00 7,920.00
JUMLAH 350,812.50
DIBULATKAN 350,810.00
HARGA SATUAN JUMLAH
No. URAIAN PEKERJAAN ANALISA SATUAN BAHAN/UPAH HARGA
(Rp) (Rp)
1 2 3 4 5 6
48. 1 M' Pasang List Keramik Dinding 5/20 Motif
SNI No. 6.54 ~ List Keramik Dinding Motif 5.1000 Bh 18,000.00 91,800.00
7395-2008 ~ Semen PC 0.5700 Kg 1,800.00 1,026.00
~ Pasir Pasang 0.0015 M³ 510,000.00 765.00
~ Semen Warna 0.0130 Kg 24,000.00 312.00
~ Pekerja 0.0900 H/o 107,000.00 9,630.00
~ Tukang 0.0900 H/o 141,500.00 12,735.00
~ Kepalla Tukang 0.0090 H/o 155,500.00 1,399.50
~ Mandor 0.0050 H/o 176,000.00 880.00
JUMLAH 118,547.50
DIBULATKAN 118,540.00
49. 1 M' Pasang List Plint Keramik Dinding 10/40
SNI No. 6.21 ~ List Plint Keramik 10 x 40 2.6500 Bh 30,000.00 79,500.00
7395-2008 ~ Semen PC 1.1400 Kg 1,800.00 2,052.00
~ Pasir Pasang 0.0030 M³ 510,000.00 1,530.00
~ Semen Warna 0.1000 Kg 24,000.00 2,400.00
~ Pekerja 0.0900 H/o 107,000.00 9,630.00
~ Tukang 0.0900 H/o 141,500.00 12,735.00
~ Kepalla Tukang 0.0090 H/o 155,500.00 1,399.50
~ Mandor 0.0050 H/o 176,000.00 880.00
JUMLAH 110,126.50
DIBULATKAN 110,120.00
50. 1 M² Pasang Paving Block
SNI No. 6.21 ~ Pasir Pasang 0.1100 M³ 510,000.00 56,100.00
7395-2008 ~ Sirtu 0.2200 M³ 285,000.00 62,700.00
~ Paving Block 30.0000 Bh 5,000.00 150,000.00
~ Pekerja 0.7500 H/o 107,000.00 80,250.00
~ Tukang 0.5000 H/o 141,500.00 70,750.00
~ Kepalla Tukang 0.0500 H/o 155,500.00 7,775.00
~ Mandor 0.0010 H/o 176,000.00 176.00
JUMLAH 427,751.00
DIBULATKAN 427,750.00
51. 1 M² Pasangan Dinding Batu Alam
Empiris ~ Batu Alam 10.0000 Bh 20,000.00 200,000.00
~ Pasir Pasang 0.0370 M³ 510,000.00 18,870.00
~ Semen PC 14.0000 Kg 1,800.00 25,200.00
~ Tukang 0.2440 oh 141,500.00 34,526.00
~ Kepala tukang 0.0244 org 155,500.00 3,794.20
~ Pekerja 0.5700 org 107,000.00 60,990.00
~ Mandor 0.0336 org 176,000.00 5,913.60
JUMLAH 349,293.80
DIBULATKAN 349,290.00
52. 1 M² Pasangan Dinding Batu Terawang/Roster
Empiris ~ Batu Kerawang 10.0000 Bh 30,000.00 300,000.00
~ Pasir Pasang 0.0370 M³ 510,000.00 18,870.00
~ Semen PC 14.0000 Kg 1,800.00 25,200.00
~ Tukang 0.2440 oh 141,500.00 34,526.00
~ Kepala tukang 0.0244 org 155,500.00 3,794.20
~ Pekerja 0.5700 org 107,000.00 60,990.00
~ Mandor 0.0336 org 176,000.00 5,913.60
JUMLAH 449,293.80
DIBULATKAN 449,290.00

# PEKERJAAN KAYU dan PLAFOND

53. 1 M³ Kusen Pintu dan Jendela 5/10


SNI No. 6.1 ~ Kayu Besi uk. 5/10 1.1000 M³ 5,100,000.00 5,610,000.00
3434-2008 ~ Paku 1.2500 Kg 27,500.00 34,375.00
~ Lem Kayu 1.0000 Kg 83,000.00 83,000.00
~ Pekerja 7.0000 H/o 107,000.00 749,000.00
~ Tukang 21.0000 H/o 141,500.00 2,971,500.00
~ Kepalla Tukang 2.1000 H/o 155,500.00 326,550.00
~ Mandor 0.3500 H/o 176,000.00 61,600.00
JUMLAH 9,836,025.00
DIBULATKAN 9,836,020.00
54. 1 M² Pasang Daun Pintu Panil Kayu
SNI No. 6.5 ~ Papan Kayu Besi 0.0400 M³ 5,100,000.00 204,000.00
3434-2008 ~ Lem Kayu 0.5000 Kg 83,000.00 41,500.00
~ Pekerja 1.0000 H/o 107,000.00 107,000.00
~ Tukang 3.0000 H/o 141,500.00 424,500.00
~ Kepalla Tukang 0.3000 H/o 155,500.00 46,650.00
~ Mandor 0.0500 H/o 176,000.00 8,800.00
JUMLAH 832,450.00
DIBULATKAN 832,450.00

HARGA SATUAN JUMLAH


No. URAIAN PEKERJAAN ANALISA SATUAN BAHAN/UPAH HARGA
(Rp) (Rp)
1 2 3 4 5 6
55. 1 M² Pasang Daun Pintu Panil Kaca
SNI No. 6.6 ~ Kaca Ryben T. 5 mm 1.1000 M² 420,000.00 462,000.00
3434-2008 ~ Papan kayu Besi 0.0240 M³ 5,100,000.00 122,400.00
~ Lem Kayu 0.3000 Kg 83,000.00 24,900.00
~ Pekerja 0.8000 H/o 107,000.00 85,600.00
~ Tukang 2.4000 H/o 141,500.00 339,600.00
~ Kepalla Tukang 0.2400 H/o 155,500.00 37,320.00
~ Mandor 0.0400 H/o 176,000.00 7,040.00
JUMLAH 1,078,860.00
DIBULATKAN 1,078,860.00
56. 1 M² Pasangan Jendela Panil Kaca
~ Papan Kayu Besi 0.0240 M³ 5,100,000.00 122,400.00
~ Lem Kayu 0.3000 Kg 83,000.00 24,900.00
~ Kaca Ryben T. 5 mm 1.1000 M² 420,000.00 462,000.00
~ Tukang Kayu 2.4000 H/o 141,500.00 339,600.00
~ Pekerja 0.8000 H/o 107,000.00 85,600.00
~ Kepala Tukang Kayu 0.2400 H/o 155,500.00 37,320.00
~ Mandor 0.0400 H/o 176,000.00 7,040.00
JUMLAH 1,078,860.00
DIBULATKAN 1,078,860.00
57. 1 M² Pasangan Jalusi
~ Papan Kayu Besi 0.0640 M³ 5,100,000.00 326,400.00
~ Tukang Kayu 3.0000 H/o 141,500.00 424,500.00
~ Kepala Tukang Kayu 0.3000 H/o 155,500.00 46,650.00
~ Pekerja 1.0000 H/o 107,000.00 107,000.00
~ Mandor 0.0500 H/o 176,000.00 8,800.00
~ Paku 0.1500 Kg 27,500.00 4,125.00
JUMLAH 917,475.00
DIBULATKAN 917,470.00
58. 1 M² Pasang Daun Pintu Panil Kayu Lapis Seng Plat
SNI No. 6.5 ~ Papan Kayu Besi 0.0400 M³ 5,100,000.00 204,000.00
3434-2008 ~ Lem Kayu 0.5000 Kg 83,000.00 41,500.00
~ Seng Plat BJLS 30 0.5300 Lbr 94,500.00 50,085.00
~ Pekerja 1.0000 H/o 107,000.00 107,000.00
~ Tukang 3.0000 H/o 141,500.00 424,500.00
~ Kepalla Tukang 0.3000 H/o 155,500.00 46,650.00
~ Mandor 0.0500 H/o 176,000.00 8,800.00
JUMLAH 882,535.00
DIBULATKAN 882,530.00
59. 1 M² Dinding Partisi Double Gypsumboard R, Ky. Besi
SNI No. 6.5 ~ Balok Ky. Besi 0.0195 M³ 5,100,000.00 99,450.00
3434-2008 ~ Papan Ky. Besi 0.0070 M³ 5,100,000.00 35,700.00
~ Paku 0.1000 Kg 27,500.00 2,750.00
~ Lem Kayu 0.5600 Ltr 83,000.00 46,480.00
~ Gypsumboard T 9 mm 1.0000 Lbr 114,000.00 114,000.00
~ Pekerja 0.1500 H/o 107,000.00 16,050.00
~ Tukang 0.4500 H/o 141,500.00 63,675.00
~ Kepalla Tukang 0.0450 H/o 155,500.00 6,997.50
~ Mandor 0.0750 H/o 176,000.00 13,200.00
JUMLAH 398,302.50
DIBULATKAN 398,300.00
60. 1 M² Pasang Jendela Kaca Mati (kaca bening t. 5 mm)
~ Kaca Bening T. 5 mm 1.1000 M² 420,000.00 462,000.00
~ Pekerja 0.0150 H/o 107,000.00 1,605.00
~ Tukang 0.1500 H/o 141,500.00 21,225.00
~ Kepalla Tukang 0.0150 H/o 155,500.00 2,332.50
~ Mandor 0.0080 H/o 176,000.00 1,408.00
JUMLAH 488,570.50
DIBULATKAN 488,570.00
61. 1 M² Pasang Dinding Kaca Mati (kaca bening t. 12 mm)
~ Kaca Bening T. 12 mm 1.2000 M² 550,000.00 660,000.00
~ Kusen Aluminium 1.0000 M² 123,843.00 123,843.00
~ Pekerja 0.0150 H/o 107,000.00 1,605.00
~ Tukang 0.1500 H/o 141,500.00 21,225.00
~ Kepalla Tukang 0.0150 H/o 155,500.00 2,332.50
~ Mandor 0.0080 H/o 176,000.00 1,408.00
JUMLAH 810,413.50
DIBULATKAN 810,410.00
62. 1 M² Rangka plafond 60 x 60 Ky Besi 5/5,
SNI ~ Balok kayu Besi 5/5 0.0163 M³ 5,100,000.00 83,130.00
2839-2008 ~ Paku campur 0.2500 kg 36,000.00 9,000.00
~ Pekerja 0.2000 H/o 107,000.00 21,400.00
~ Tukang 0.3000 H/o 141,500.00 42,450.00
~ Kepala tukang 0.0300 H/o 155,500.00 4,665.00
~ Mandor 0.0100 H/o 176,000.00 1,760.00
JUMLAH (Belum PPn) 162,405.00
DIBULATKAN 162,400.00
HARGA SATUAN JUMLAH
No. URAIAN PEKERJAAN ANALISA SATUAN BAHAN/UPAH HARGA
(Rp) (Rp)
1 2 3 4 5 6
63. 1 M² Langit - langit Gypsum Board t. 9 mm,
SNI ~ Gypsum board 9 mm 0.3640 lbr 114,000.00 41,496.00
2839-2008 ~ Kasa gypsum 0.0500 roll 48,000.00 2,400.00
~ Tepung gypsum 0.4500 kg 21,600.00 9,720.00
~ Alkasit 0.0030 kg 600,000.00 1,800.00
~ Paku skrup 20.0000 kg 840.00 16,800.00
~ Pekerja 0.2400 H/o 107,000.00 25,680.00
~ Tukang 0.3700 H/o 141,500.00 52,355.00
~ Kepalla Tukang 0.0370 H/o 155,500.00 5,753.50
~ Mandor 0.0120 H/o 176,000.00 2,112.00
JUMLAH 158,116.50
DIBULATKAN 158,110.00
64. 1 M² Langit - langit Calsiboard t. 6 mm,
SNI ~ Calsiboard 6 mm 0.3640 lbr 108,000.00 39,312.00
2839-2008 ~ Kasa gypsum 0.0500 roll 48,000.00 2,400.00
~ Tepung gypsum 0.4500 kg 21,600.00 9,720.00
~ Alkasit 0.0030 kg 600,000.00 1,800.00
~ Paku skrup 20.0000 kg 840.00 16,800.00
~ Pekerja 0.2400 H/o 107,000.00 25,680.00
~ Tukang 0.3700 H/o 141,500.00 52,355.00
~ Kepalla Tukang 0.0370 H/o 155,500.00 5,753.50
~ Mandor 0.0120 H/o 176,000.00 2,112.00
JUMLAH 155,932.50
DIBULATKAN 155,930.00
65. 1 M' Pasang List Profil Cornees Gypsum 5 - 10 cm
SNI ~ List Profil Cornees Gypsum 1.0500 M' 50,000.00 52,500.00
2839-2008 ~ Tepung Gypsum 0.1500 Kg 21,600.00 3,240.00
~ Alkasit 0.0040 Kg 600,000.00 2,400.00
~ Pekerja 0.0600 H/o 107,000.00 6,420.00
~ Tukang 0.0600 H/o 141,500.00 8,490.00
~ Kepalla Tukang 0.0060 H/o 155,500.00 933.00
~ Mandor 0.0030 H/o 176,000.00 528.00
JUMLAH 74,511.00
DIBULATKAN 74,510.00
66. 1 M' Pasang List Profil Kayu
SNI ~ List Profil Kayu 1.2000 M' 36,000.00 43,200.00
2839-2008 ~ Paku 0.0100 Kg 29,500.00 295.00
~ Pekerja 0.0500 H/o 107,000.00 5,350.00
~ Tukang 0.0500 H/o 141,500.00 7,075.00
~ Kepalla Tukang 0.0050 H/o 155,500.00 777.50
~ Mandor 0.0030 H/o 176,000.00 528.00
JUMLAH 57,225.50
DIBULATKAN 57,220.00
67. 1 M² Pekerjaan Dinding Skat Double Teakwood
~ Teakwood 0.7600 Lbr 185,000.00 140,600.00
~ Rangka Kayu Besi 5/10 0.0200 M³ 5,100,000.00 102,000.00
~ Kayu Besi Papan 0.0070 M³ 5,100,000.00 35,700.00
~ Paku Triplrks 0.1000 Kg 29,500.00 2,950.00
~ Lem Kayu 0.5600 Kg 83,000.00 46,480.00
~ Tukang Kayu 0.4500 H/o 141,500.00 63,675.00
~ Pekerja 0.1500 H/o 107,000.00 16,050.00
~ Kepala Tukang 0.0450 H/o 155,500.00 6,997.50
~ Mandor 0.0750 H/o 176,000.00 13,200.00
JUMLAH 427,652.50
DIBULATKAN 427,650.00
68. 1 Set Pek. Kaca Nako 8 Klip + Tralis
~ Stang Louver + Kaca + Tralis 1.0000 Set 325,000.00 325,000.00
~ Tukang Kayu 1.3000 H/o 141,500.00 183,950.00
~ Pekerja 0.2800 H/o 107,000.00 29,960.00
~ Kepala Tukang 0.1300 H/o 155,500.00 20,215.00
~ Mandor 0.1000 H/o 176,000.00 17,600.00
JUMLAH 576,725.00
DIBULATKAN 576,720.00
69. 1 M² Memasang Teralis Besi Tempa
~ Baja Tempa 6.1770 M' 45,000.00 277,965.00
~ Pengelasan 27.0800 Cm 4,570.80 123,777.26
~ Tukang Las 1.6700 H/o 141,500.00 236,305.00
~ Pekerja 1.6700 H/o 107,000.00 178,690.00
~ Kepala Tukang 0.1670 H/o 155,500.00 25,968.50
~ Mandor 0.0830 H/o 176,000.00 14,608.00
JUMLAH 857,313.76
DIBULATKAN 857,310.00
70. 1 M² Pas. Kawat Harmonika
~ Papan Kayu Besi 0.0018 M³ 5,100,000.00 9,180.00
~ Kawat Harmonika 1.1000 M² 88,000.00 96,800.00
~ Paku 0.0200 Kg 27,500.00 550.00
~ Tukang Kayu 0.1000 H/o 141,500.00 14,150.00
~ Kepala Tukang Kayu 0.0100 H/o 155,500.00 1,555.00
~ Pekerja 0.1000 H/o 107,000.00 10,700.00
~ Mandor 0.0005 H/o 176,000.00 88.00
JUMLAH 123,843.00
DIBULATKAN 123,840.00

# PEKERJAAN PENGGANTUNG & PENGUNCI


71. 1 Bh Pasang Kunci Tanam 2 Slaag
SNI ~ Kunci Tanam Dua Slaag 1.0000 Bh 165,000.00 165,000.00
2835-2002 ~ Pekerja 0.0100 H/o 107,000.00 1,070.00
~ Tukang 0.5000 H/o 141,500.00 70,750.00
~ Kepala Tukang 0.0100 H/o 155,500.00 1,555.00
~ Mandor 0.0050 H/o 176,000.00 880.00
JUMLAH (Belum PPn) 239,255.00
DIBULATKAN 239,250.00
72. 1 Bh Pasang Kunci Silinder
SNI ~ Kunci Silinder 1.0000 Bh 165,000.00 165,000.00
2835-2002 ~ Pekerja 0.0050 H/o 107,000.00 535.00
~ Tukang 0.5000 H/o 141,500.00 70,750.00
~ Kepala Tukang 0.0100 H/o 155,500.00 1,555.00
~ Mandor 0.0003 H/o 176,000.00 52.80
JUMLAH (Belum PPn) 237,892.80
DIBULATKAN 237,890.00
73. 1 Bh Pasang Engsel Pintu Ring Nilon
SNI ~ Engsel Pintu Ring Nilon 1.0000 M¹ 45,000.00 45,000.00
2835-2002 ~ Pekerja 0.0150 H/o 107,000.00 1,605.00
~ Tukang 0.1500 H/o 141,500.00 21,225.00
~ Kepala Tukang 0.0150 H/o 155,500.00 2,332.50
~ Mandor 0.0008 H/o 176,000.00 132.00
JUMLAH (Belum PPn) 70,294.50
DIBULATKAN 70,290.00
74. 1 Bh Pasang Engsel Jendela Ring Nilon
SNI ~ Engsel Jendela Ring Nilon 1.0000 M¹ 16,800.00 16,800.00
2835-2002 ~ Pekerja 0.0100 H/o 107,000.00 1,070.00
~ Tukang 0.1000 H/o 141,500.00 14,150.00
~ Kepala Tukang 0.0100 H/o 155,500.00 1,555.00
~ Mandor 0.0050 H/o 176,000.00 880.00
JUMLAH (Belum PPn) 34,455.00
DIBULATKAN 34,450.00
75. 1 Bh Pasang Grendel Jendela
SNI ~ Kunci Grendel Jendela 1.0000 Bh 18,500.00 18,500.00
2835-2002 ~ Pekerja 0.0500 H/o 107,000.00 5,350.00
~ Tukang 0.5000 H/o 141,500.00 70,750.00
~ Kepala Tukang 0.0500 H/o 155,500.00 7,775.00
~ Mandor 0.0025 H/o 176,000.00 440.00
JUMLAH (Belum PPn) 102,815.00
DIBULATKAN 102,810.00
76. 1 Bh Pasang Hak Angin Jendela
SNI ~ Hak Angin Biasa 1.0000 Bh 23,000.00 23,000.00
2835-2002 ~ Pekerja 0.0500 H/o 107,000.00 5,350.00
~ Tukang 0.5000 H/o 141,500.00 70,750.00
~ Kepala Tukang 0.0500 H/o 155,500.00 7,775.00
~ Mandor 0.0025 H/o 176,000.00 440.00
JUMLAH (Belum PPn) 107,315.00
DIBULATKAN 107,310.00
77. 1 Bh Pasang Door Closer
SNI ~ Dor Closer 1.0000 Bh 30,000.00 30,000.00
2835-2002 ~ Pekerja 0.0500 H/o 107,000.00 5,350.00
~ Tukang 0.5000 H/o 141,500.00 70,750.00
~ Kepala Tukang 0.0500 H/o 155,500.00 7,775.00
~ Mandor 0.0025 H/o 176,000.00 440.00
JUMLAH (Belum PPn) 114,315.00
DIBULATKAN 114,310.00
HARGA SATUAN JUMLAH
No. URAIAN PEKERJAAN ANALISA SATUAN BAHAN/UPAH HARGA
(Rp) (Rp)
1 2 3 4 5 6

# PEKERJAAN KAP dan ATAP

78. 1 M³ Konstruksi Kuda - kuda Ky. Besi 5/10


SNI No. 6.13 ~ Kayu Besi uk. 5/10 1.1000 M³ 5,100,000.00 5,610,000.00
3434-2008 ~ Paku 5.6000 Kg 27,500.00 154,000.00
~ Besi Strip T. 5 mm 15.0000 Kg 19,000.00 285,000.00
~ Pekerja 4.0000 H/o 107,000.00 428,000.00
~ Tukang 12.0000 H/o 141,500.00 1,698,000.00
~ Kepalla Tukang 1.2000 H/o 155,500.00 186,600.00
~ Mandor 0.2000 H/o 176,000.00 35,200.00
JUMLAH 8,396,800.00
DIBULATKAN 8,396,800.00
79. 1 M³ Konstruksi Gording Ky. Besi 5/10
SNI No. 6.15 ~ Kayu Besi 5/10 1.1000 M³ 5,100,000.00 5,610,000.00
3434-2008 ~ Besi Strip t. 5 mm 15.0000 Kg 19,000.00 285,000.00
~ Paku Kayu 3.0000 Kg 27,500.00 82,500.00
~ Pekerja 2.4000 H/o 107,000.00 256,800.00
~ Tukang 7.2000 H/o 141,500.00 1,018,800.00
~ Kepalla Tukang 0.7200 H/o 155,500.00 111,960.00
~ Mandor 0.1200 H/o 176,000.00 21,120.00
JUMLAH 7,386,180.00
DIBULATKAN 7,386,180.00
80. 1 M² Pasang Atap Genteng Roftop
SNI No. 6.32 ~ Atap Roftop 1.0200 Lbr 216,000.00 220,320.00
03-3436-2002 ~ Paku 0.2000 Kg 27,500.00 5,500.00
~ Pekerja 0.2000 H/o 107,000.00 21,400.00
~ Tukang Kayu 0.1000 H/o 141,500.00 14,150.00
~ Kepala Tukang Kayu 0.0100 H/o 155,500.00 1,555.00
~ Mandor 0.0010 H/o 176,000.00 176.00
JUMLAH 263,101.00
DIBULATKAN 263,100.00
HARGA SATUAN JUMLAH
No. URAIAN PEKERJAAN ANALISA SATUAN BAHAN/UPAH HARGA
(Rp) (Rp)
1 2 3 4 5 6

81. 1 M' Pasang Nok Genteng Metal


SNI No. 6.36 ~ Nok Genteng Metal 1.1000 Lbr 96,000.00 105,600.00
03-3436-2002 ~ Paku 0.0500 Kg 27,500.00 1,375.00
~ Pekerja 0.2500 H/o 107,000.00 26,750.00
~ Tukang Kayu 0.1500 H/o 141,500.00 21,225.00
~ Kepala Tukang Kayu 0.0150 H/o 155,500.00 2,332.50
~ Mandor 0.0130 H/o 176,000.00 2,288.00
JUMLAH 159,570.50
DIBULATKAN 159,570.00
82. 1 M² Pasang Kaso + Reng Genteng Metal
~ Usuk kayu 5/7 Kayu Besi 0.0140 M³ 5,100,000.00 71,400.00
~ Reng 3/4 Besi 0.0072 M³ 5,100,000.00 36,720.00
~ Paku usuk & reng 0.2500 Kg 27,500.00 6,875.00
~ Pekerja 0.1000 H/o 107,000.00 10,700.00
~ Tukang Kayu 0.1000 H/o 141,500.00 14,150.00
~ Kepala Tukang Kayu 0.0100 H/o 155,500.00 1,555.00
~ Mandor 0.0050 H/o 176,000.00 880.00
JUMLAH 142,280.00
DIBULATKAN 142,280.00
83. 1 M' Pasang Talang Seng
SNI No. 6.36 ~ Talang Seng 0.3 x 0.45 1.0500 Lbr 94,500.00 99,225.00
03-3436-2002 ~ Papan Kayu 0.0190 Lbr 5,100,000.00 96,900.00
~ Paku 0.0150 Kg 27,500.00 412.50
~ Pekerja 0.2000 H/o 107,000.00 21,400.00
~ Tukang Kayu 0.4000 H/o 141,500.00 56,600.00
~ Kepala Tukang Kayu 0.0250 H/o 155,500.00 3,887.50
~ Mandor 0.0100 H/o 176,000.00 1,760.00
JUMLAH 280,185.00
DIBULATKAN 280,180.00
84. 1 M² Pasang Listplank uk. 2.5 x 20 cm
SNI No. 6.22 ~ Papan Kayu Besi 0.0110 M³ 5,100,000.00 56,100.00
3434-2008 ~ Paku 0.0500 Kg 27,500.00 1,375.00
~ Pekerja 0.1100 H/o 107,000.00 11,770.00
~ Tukang Kayu 0.2200 H/o 141,500.00 31,130.00
~ Kepala Tukang Kayu 0.0220 H/o 155,500.00 3,421.00
~ Mandor 0.0050 H/o 176,000.00 880.00
JUMLAH 104,676.00
DIBULATKAN 104,670.00

# PEKERJAAN PENGECATAN
85. 1 M² Pengecatan Interior Tembok Baru ( 1 lapis plamir,
1 lapis cat dasar, 2 lapis cat penutup)
SNI - 6.14 ~ Plamur tembok 0.1000 Kg 30,000.00 3,000.00
2835-2002 ~ Cat Dasar 0.1000 Kg 125,000.00 12,500.00
~ Cat Penutup 2x 0.2600 Kg 125,000.00 32,500.00
~ Pekerja 0.0200 H/o 107,000.00 2,140.00
~ Tukang Kayu 0.0630 H/o 141,500.00 8,914.50
~ Kepala Tukang 0.0063 H/o 155,500.00 979.65
~ Mandor 0.0030 H/o 176,000.00 528.00
JUMLAH 60,562.15
DIBULATKAN 60,560.00
86. 1 M² Pengecatan Exterior Tembok Baru ( 1 lapis plamir,
1 lapis cat dasar, 2 lapis cat penutup)
~ Plamur tembok 0.1000 Kg 30,000.00 3,000.00
~ Cat Dasar 0.1000 Kg 131,000.00 13,100.00
~ Cat Penutup 2x 0.2600 Kg 131,000.00 34,060.00
~ Pekerja 0.0200 H/o 107,000.00 2,140.00
~ Tukang Kayu 0.0630 H/o 141,500.00 8,914.50
~ Kepala Tukang 0.0063 H/o 155,500.00 979.65
~ Mandor 0.0030 H/o 176,000.00 528.00
JUMLAH 62,722.15
DIBULATKAN 62,720.00
87. 1 M² Pengecatan Bidang kayu Baru (1 lapis palmir,
1 lapis cat dasar, 3 lapis cat penutup)
SNI - 6.9 ~ Cat Menie 0.2000 Kg 30,200.00 6,040.00
2835-2002 ~ Plamur 0.1500 Kg 30,000.00 4,500.00
~ Cat dasar 0.1700 Kg 61,500.00 10,455.00
~ Cat Kilat/Minyak 0.3500 Kg 61,500.00 21,525.00
~ Pekerja 0.0700 H/o 107,000.00 7,490.00
~ Tukang 0.1050 H/o 141,500.00 14,857.50
~ Kepala Tukang 0.0040 H/o 155,500.00 622.00
~ Mandor 0.0025 H/o 176,000.00 440.00
JUMLAH 65,929.50
DIBULATKAN 65,920.00

HARGA SATUAN JUMLAH


No. URAIAN PEKERJAAN ANALISA SATUAN BAHAN/UPAH HARGA
(Rp) (Rp)
1 2 3 4 5 6
88. 1 M² Pekerjaan Teak Oil Politur
SNI - 6.9 ~ Teak oil / Politur 0.1500 Ltr 49,000.00 7,350.00
2835-2002 ~ Dempul 0.0500 Kg 30,200.00 1,510.00
~ Amplas 2.0000 Lbr 7,500.00 15,000.00
~ Kuas 0.0100 Bh 9,500.00 95.00
~ Pekerja 0.1600 H/o 107,000.00 17,120.00
~ Tukang Kayu 0.1600 H/o 141,500.00 22,640.00
~ Kepala Tukang Kayu 0.0160 H/o 155,500.00 2,488.00
~ Mandor 0.0025 H/o 176,000.00 440.00
JUMLAH 66,643.00
DIBULATKAN 66,640.00
89. 1 M² Cat Tembok Baru / Kapur
Dinding (3 X Cat)
SNI - 6.9 ~ Plamur 0.1000 Kg 30,000.00 3,000.00
2835-2002 ~ Cat Tembok 0.2600 Kg 26,800.00 6,968.00
~ Pekerja 0.0200 H/o 107,000.00 2,140.00
~ Tukang Kayu 0.0630 H/o 141,500.00 8,914.50
~ Kepala Tukang Kayu 0.0063 H/o 155,500.00 979.65
~ Mandor 0.0030 H/o 176,000.00 528.00
JUMLAH 22,530.15
DIBULATKAN 22,530.00
90. 1 M² Cat Kayu / Kilat Baru (3 X )
Menggosok & Mendempul
SNI - 6.9 ~ Cat Menie 0.2000 Kg 30,200.00 6,040.00
2835-2002 ~ Plamur 0.1500 Kg 30,000.00 4,500.00
~ Cat dasar 0.1700 Kg 30,200.00 5,134.00
~ Cat Kilat/Minyak 0.3500 Kg 61,500.00 21,525.00
~ Pekerja 0.0700 H/o 107,000.00 7,490.00
~ Tukang Kayu 0.1050 H/o 141,500.00 14,857.50
~ Kepala Tukang Kayu 0.0040 H/o 155,500.00 622.00
~ Mandor 0.0025 H/o 176,000.00 440.00
JUMLAH 60,608.50
DIBULATKAN 60,600.00

# PEKERJAAN ELEKTRIKAL
91. 1 TTK DownLight XL 18 Watt Grill Armatur
~ Downlight XL 18W Grill Armatur 1.0000 Set 385,000.00 385,000.00
~ Acsesoris 1.0000 Ls 11,000.00 11,000.00
~ Kabel Listrik 5.0000 M' 17,500.00 87,500.00
~ Pekerja 1.0000 H/o 107,000.00 107,000.00
~ Tukang 1.0000 H/o 141,500.00 141,500.00
~ Kepala Tukang 0.1000 H/o 155,500.00 15,550.00
~ Mandor 0.0500 H/o 176,000.00 8,800.00
JUMLAH 756,350.00
DIBULATKAN 756,350.00
92. 1 TTK Pasang Lampu PLC 18 Watt
~ Lampu PLC 18 Watt 1.0000 Bh 40,000.00 40,000.00
~ Acsesoris 1.0000 Bh 11,000.00 11,000.00
~ Kabel Listrik 5.0000 M' 17,500.00 87,500.00
~ Pekerja 1.0000 H/o 107,000.00 107,000.00
~ Tukang 1.0000 H/o 141,500.00 141,500.00
~ Kepala Tukang 0.1000 H/o 155,500.00 15,550.00
~ Mandor 0.0500 H/o 176,000.00 8,800.00
JUMLAH 411,350.00
DIBULATKAN 411,350.00
93. 1 TTK Pasang Saklar Tunggal
~ Saklar Tunggal 1.0000 Bh 34,500.00 34,500.00
~ Kabel Listrik 5.0000 M' 17,500.00 87,500.00
~ Pipa Kabel Union 1.0000 Btg 28,000.00 28,000.00
~ Pekerja 0.5000 H/o 107,000.00 53,500.00
~ Tukang 0.5000 H/o 141,500.00 70,750.00
~ Kepala Tukang Listrik 0.0500 H/o 155,500.00 7,775.00
~ Mandor 0.0250 H/o 176,000.00 4,400.00
JUMLAH 286,425.00
DIBULATKAN 286,420.00
94. 1 TTK Pasang Saklar Double
~ Saklar Double 1.0000 Bh 34,500.00 34,500.00
~ Kabel 5.0000 M' 17,500.00 87,500.00
~ Pipa Kabel Union 1.0000 Btg 28,000.00 28,000.00
~ Pekerja 0.5000 H/o 107,000.00 53,500.00
~ Tukang 0.5000 H/o 141,500.00 70,750.00
~ Kepala Tukang Listrik 0.0500 H/o 155,500.00 7,775.00
~ Mandor 0.0250 H/o 176,000.00 4,400.00
JUMLAH 286,425.00
DIBULATKAN 286,420.00
HARGA SATUAN JUMLAH
No. URAIAN PEKERJAAN ANALISA SATUAN BAHAN/UPAH HARGA
(Rp) (Rp)
1 2 3 4 5 6
95. 1 Ttk Pasang Stop Kontak
~ Stop Kontak 1.0000 Bh 34,500.00 34,500.00
~ Kabel 5.0000 M 17,500.00 87,500.00
~ Pipa Kabel Union 1.0000 Btg 28,000.00 28,000.00
~ Pekerja 0.5000 H/o 107,000.00 53,500.00
~ Tukang 0.5000 H/o 141,500.00 70,750.00
~ Kepala Tukang Listrik 0.0500 H/o 155,500.00 7,775.00
~ Mandor 0.0250 H/o 176,000.00 4,400.00
JUMLAH 286,425.00
DIBULATKAN 286,420.00
# PEKERJAAN SANITAIR
96. 1 M¹ Memasang PIPA GIP Medium Ø ½"
~ Pipa GIP Medium Ø ½" 1.2000 M¹ 24,666.67 29,600.00
~ Aksesoris (35 % dari Harga Bahan) 8,633.33
~ Pekerja 0.0540 H/o 107,000.00 5,778.00
~ Tukang 0.0900 H/o 141,500.00 12,735.00
~ Kepala Tukang 0.0090 H/o 155,500.00 1,399.50
~ Mandor 0.0270 H/o 176,000.00 4,752.00
JUMLAH 62,897.83
DIBULATKAN 62,890.00
97. 1 M¹ Memasang PIPA GIP Medium Ø ¾"
~ Pipa GIP Medium Ø ¾" 1.2000 M¹ 31,200.00 37,440.00
~ Aksesoris (35 % dari Harga Bahan) 10,920.00
~ Pekerja 0.0540 H/o 107,000.00 5,778.00
~ Tukang 0.0900 H/o 141,500.00 12,735.00
~ Kepala Tukang 0.0090 H/o 155,500.00 1,399.50
~ Mandor 0.0270 H/o 176,000.00 4,752.00
JUMLAH 73,024.50
DIBULATKAN 73,020.00
98. 1 M¹ Memasang Pipa GIP Ø 1"
~ Pipa GIP Ø 1 1.2000 Bh 40,700.00 48,840.00
~ Perlengkapan (35% Harga Pipa) 0.3500 14,245.00
~ Pekerja 0.5400 H/o 107,000.00 57,780.00
~ Tukang 0.0900 H/o 141,500.00 12,735.00
~ Kepala Tukang 0.0900 H/o 155,500.00 13,995.00
~ Mandor 0.0270 H/o 176,000.00 4,752.00
JUMLAH 152,347.00
DIBULATKAN 152,340.00
99. 1 M¹ Memasang Pipa GIP Ø 2"
~ Pipa GIP Ø 2 1.2000 Bh 103,625.00 124,350.00
~ Perlengkapan (35% Harga Pipa) 0.3500 36,268.75
~ Pekerja 0.5400 H/o 107,000.00 57,780.00
~ Tukang 0.0900 H/o 141,500.00 12,735.00
~ Kepala Tukang 0.0900 H/o 155,500.00 13,995.00
~ Mandor 0.0270 H/o 176,000.00 4,752.00
JUMLAH 249,880.75
DIBULATKAN 249,880.00
100. 1 M¹ Memasang Pipa PVC Ø 2" AW
~ Pipa PVC Ø 2 AW 1.2000 Bh 24,875.00 29,850.00
~ Perlengkapan (35% Harga Pipa) 8,706.25
~ Pekerja 0.0810 H/o 107,000.00 8,667.00
~ Tukang 0.1350 H/o 141,500.00 19,102.50
~ Kepala Tukang 0.0135 H/o 155,500.00 2,099.25
~ Mandor 0.0041 H/o 176,000.00 721.60
JUMLAH 69,146.60
DIBULATKAN 69,140.00
101. 1 M¹ Memasang Pipa PVC Ø 2,5" AW
~ Pipa PVC Ø 2,5 AW 1.2000 Bh 33,750.00 40,500.00
~ Perlengkapan (35% Harga Pipa) 11,812.50
~ Pekerja 0.0810 H/o 107,000.00 8,667.00
~ Tukang 0.1350 H/o 141,500.00 19,102.50
~ Kepala Tukang 0.0135 H/o 155,500.00 2,099.25
~ Mandor 0.0041 H/o 176,000.00 721.60
JUMLAH 82,902.85
DIBULATKAN 82,900.00
102. 1 M¹ Memasang Pipa PVC Ø 3" AW
~ Pipa PVC Ø 3 AW 1.2000 Bh 52,500.00 63,000.00
~ Perlengkapan (35% Harga Pipa) 18,375.00
~ Pekerja 0.0810 H/o 107,000.00 8,667.00
~ Tukang 0.1350 H/o 141,500.00 19,102.50
~ Kepala Tukang 0.0135 H/o 155,500.00 2,099.25
~ Mandor 0.0041 H/o 176,000.00 721.60
JUMLAH 111,965.35
DIBULATKAN 111,960.00
103. 1 M¹ Memasang Pipa PVC Ø 4" AW
~ Pipa PVC Ø 4 AW 1.2000 Bh 81,875.00 98,250.00
~ Perlengkapan (35% Harga Pipa) 28,656.25
~ Pekerja 0.0810 H/o 107,000.00 8,667.00
~ Tukang 0.1350 H/o 141,500.00 19,102.50
~ Kepala Tukang 0.0135 H/o 155,500.00 2,099.25
~ Mandor 0.0041 H/o 176,000.00 721.60
JUMLAH 157,496.60
DIBULATKAN 157,490.00
104. 1 Bh Memasang Kloset Jongkok Porselin
~ Kloset Jongkok Porselin 1.0000 Bh 630,000.00 630,000.00
~ Semen Portland 6.0000 Kg 1,998.00 11,988.00
~ Pasir Pasang 0.0100 M³ 510,000.00 5,100.00
~ Pekerja 1.0000 H/o 107,000.00 107,000.00
~ Tukang 1.5000 H/o 141,500.00 212,250.00
~ Kepala Tukang 1.5000 H/o 155,500.00 233,250.00
~ Mandor 0.1600 H/o 176,000.00 28,160.00
JUMLAH 1,227,748.00
DIBULATKAN 1,227,740.00
105. 1 Bh Memasang Kloset Duduk/Monoblock
~ Kloset Duduk/Monoblock 1.0000 Bh 2,000,000.00 2,000,000.00
~ Perlengkapan (6% Harga Bahan) 120,000.00
~ Pekerja 3.3000 H/o 107,000.00 353,100.00
~ Tukang 1.1000 H/o 141,500.00 155,650.00
~ Kepala Tukang 0.0010 H/o 155,500.00 155.50
~ Mandor 0.1600 H/o 176,000.00 28,160.00
JUMLAH 2,657,065.50
DIBULATKAN 2,657,060.00
106. 1 Bh Memasang Urinoir
~ Urinoir 1.000 bh 1,600,000.00 1,600,000.00
~ Harga urinoir (Perlengkapan) 0.300 x 96,000.00
~ PC 6.000 kg 1,998.00 11,988.00
~ Pasir pasang 0.010 m3 510,000.00 5,100.00
~ Tukang batu 1.000 org 141,500.00 141,500.00
~ Kepala tukang batu 0.100 org 155,500.00 15,550.00
~ Pekerja 1.000 org 107,000.00 107,000.00
~ Mandor 0.100 org 176,000.00 17,600.00
JUMLAH 1,994,738.00
DIBULATKAN 1,994,730.00
107. 1 Bh Memasang Kran Air Ø ½"
~ Kran Air Ø ½" 1.0000 Bh 74,000.00 74,000.00
~ Seal Tape 0.0250 Bh 67,400.00 1,685.00
~ Pekerja 0.0100 H/o 107,000.00 1,070.00
~ Tukang 0.1000 H/o 141,500.00 14,150.00
~ Kepala Tukang 0.0100 H/o 155,500.00 1,555.00
~ Mandor 0.0050 H/o 176,000.00 880.00
JUMLAH 93,340.00
DIBULATKAN 93,340.00
108. 1 Bh Memasang Floor Drain
~ Floor Drain 1.0000 Bh 39,500.00 39,500.00
~ Pekerja 0.0100 H/o 107,000.00 1,070.00
~ Tukang 0.1000 H/o 141,500.00 14,150.00
~ Kepala Tukang 0.0100 H/o 155,500.00 1,555.00
~ Mandor 0.0050 H/o 176,000.00 880.00
JUMLAH 57,155.00
DIBULATKAN 57,150.00
109. 1 Bh Pas. Bak Air Lapis Keramik 80 x 80 x 80 cm
~ Pas. Batu Tela 1 : 3 4.8000 M² 170,970.00 820,656.00
~ Spesi 1 : 2 t.1,5 cm 6.2000 M² 95,880.00 594,456.00
~ Keramik 20/25 cm 3.2000 M² 256,970.00 822,304.00
~ Lantai Kerja 1 : 3 : 5 0.0480 M³ 1,352,860.00 64,937.28
~ Dop Pipa Penguras 1.0000 Bh 8,000.00 8,000.00
~ Pekerja 2.3000 H/o 107,000.00 246,100.00
~ Tukang 3.5000 H/o 141,500.00 495,250.00
~ Kepala Tukang 0.2400 H/o 155,500.00 37,320.00
~ Mandor 0.2400 H/o 176,000.00 42,240.00
JUMLAH 3,131,263.28
DIBULATKAN 3,131,260.00
"REKAPITULASI ANGGARAN BIAYA"
KEGIATAN : Pembangunan Klinik
PEKERJAAN : Kota Jayapura, Papua, Indonesia

NO URAIAN PEKERJAAN JUMLAH HARGA

I. PEKERJAAN PERSIAPAN Rp. 18,376,112.70

II. PEKERJAAN TANAH Rp. 163,887,190.85

III. PEKERJAAN BETON Rp. 214,438,057.46

IV. PEKERJAAN DINDING DAN LANTAI Rp. 128,253,578.54

V. PEKERJAAN KAYU, PENGGANTUNG & PENGUNCI Rp. 1,444,556,447.80

VI. PEKERJAAN ATAP & PLAFOND Rp. 3,594,039.47

VII. PEKERJAAN PENGECETAN Rp. 8,632,597.84

VIII. PEKERJAAN ELEKTRIKAL Rp. 28,337,480.00

IX. PEKERJAAN MEKANIKAL & SANITAIR Rp. 17,331,930.39


X. PEKERJAAN AKHIR Rp. 1,000,000.00

REAL COST : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp. 772,463,270.85


PAJAK (PPn 10%) : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp. 77,246,327.09
TOTAL COST : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp. 849,709,597.94

PEMBULATAN : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp. 849,709,000.00

Terbilang : DELAPAN RATUS EMPAT PULUH SEMBILAN JUTA TUJUH RATUS SEMBILAN RIBU RUPIAH.

Jayapura, …………………2019

NATALIUS IRIANTO
17 - 111 - 010
Mahasiswa Teknik Sipil - USTJ
JADWAL WAKTU PELAKSANAAN ( TIME SCHEDULE )
PEKERJAAN : PEMBANGGUNAN KLINIK
LOKASI : Jayapura, Papua, Indonesia

BULAN KE 1 BULAN KE 2 BULAN KE 3


JUMLAH HARGA BOBOT
NO URAIAN PERKERJAAN MINGGU KE MINGGU KE MINGGU KE %
(Rp) (%)
1 2 3 4 1 2 3 4 1 2 3 4
I. PEKERJAAN PERSIAPAN 18,376,112.70 0.91 0.46 0.46 100%
II. PEKERJAAN TANAH 163,887,190.85 8.16 4.08 4.08
III. PEKERJAAN BETON 214,438,057.46 10.67 2.67 2.67 2.67 2.67
IV. PEKERJAAN DINDING DAN LANTAI 108,727,351.31 5.41 0.77 0.77 0.77 0.77 0.77 0.77 0.77
V. PEKERJAAN KAYU, PENGGANTUNG & PENGUNCI 1,444,556,447.80 71.91 8.99 8.99 8.99 8.99 8.99 8.99 8.99 8.99
50%
VI. PEKERJAAN ATAP & PLAFOND 3,594,039.47 0.18 0.04 0.04 0.04 0.04 0.04
VII. PEKERJAAN PENGECETAN 8,632,597.84 0.43 0.14 0.14 0.14
VIII. PEKERJAAN ELEKTRIKAL 28,337,480.00 1.41 0.47 0.47 0.47
IX. PEKERJAAN MEKANIKAL & SANITAIR 17,331,930.39 0.86 0.29 0.29 0.29
X. PEKERJAAN AKHIR 1,000,000.00 0.05 0.02 0.02
0%
TOTAL 2,008,881,207.81 100.00 0.46 4.54 6.75 11.66 12.43 12.47 9.80 9.80 10.56 10.70 10.69 0.17
BOBOT RENCANA KOMULATIF ( % ) 0 0.95 5.49 12.23 23.89 36.32 48.79 58.59 68.38 78.94 89.64 100.32 100
BOBOT REALISASI KOMULATIF ( % )
SELISIH ( % )