B. BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA PERALATAN
B. ALAT PELINDUNG
1 Helm Keselamatan Sewa-Hari 5.000 5,000.00 25,000.00
2 Sarung Tangan Sewa-Hari 5.000 2,000.00 10,000.00
3 Masker Bh 2.000 2,000.00 4,000.00
4 Hand Sanitizer Bh 1.000 11,000.00 11,000.00
JUMLAH 50,000.00
B. BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA PERALATAN
B. BAHAN
1 Portlan Cement (40 Kg) kg 230.000 1,250.00 287,500.00
2 Pasir Beton kg 893 214.29 191,357.14
3 Batu Koral 1 - 2 cm kg 1,027 228.89 235,068.89
4 Air L 200 100.00 20,000.00
JUMLAH HARGA BAHAN 733,926.03
C PERALATAN
JUMLAH HARGA PERALATAN
4. MEMBUAT 1M3 BETON MUTU F'c : 12.2 Mpa (K150), Slump (12 +/- 2) cm, w/c : 0.72
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
1 Pekerja L.01 OH 1.650 75,000.00 123,750.00
2 Tukang L.02 OH 0.275 85,000.00 23,375.00
3 Kepala Tukang L.03 OH 0.028 90,000.00 2,520.00
4 Mandor L.04 OH 0.083 98,000.00 8,134.00
JUMLAH TENAGA KERJA 157,779.00
B. BAHAN
1 Portlan Cement (40 Kg) kg 326.000 1,250.00 407,500.00
2 Pasir Beton kg 760 214.29 162,857.14
3 Batu Koral 1 - 2 cm kg 1,029 228.89 235,526.67
4 Air L 215 100.00 21,500.00
JUMLAH HARGA BAHAN 827,383.81
C PERALATAN
JUMLAH HARGA PERALATAN
B. BAHAN
1 Besi beton Polos/Ulir kg 10.500 12,000.00 126,000.00
2 Kawat Beton kg 0.150 17,500.00 2,625.00
JUMLAH HARGA BAHAN 128,625.00
C PERALATAN
JUMLAH HARGA PERALATAN
B. BAHAN
1 Kayu kelas III/ Kayu cetakan m3 0.011 3,500,000.00 39,375.00
2 Paku kg 0.300 17,500.00 5,250.00
3 Minyak Begesting liter 0.100 0.00 -
JUMLAH HARGA BAHAN/4x PAKAI 44,625.00
C PERALATAN
JUMLAH HARGA PERALATAN
7. PEMASANGAN 1M2 DINDING BATA RINGAN UK (7.5X20X60) DENGAN MORTAR SIAP PAKAI
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
1 Pekerja L.01 OH 0.300 75,000.00 22,500.00
2 Tukang L.02 OH 0.100 85,000.00 8,500.00
3 Kepala Tukang L.03 OH 0.010 90,000.00 900.00
4 Mandor L.04 OH 0.010 98,000.00 980.00
JUMLAH TENAGA KERJA 32,880.00
B. BAHAN
1 Bata Ringan t=10 cm BH 8.750 7,999.00 69,991.25
2 Mortar Siap Pakai kg 2.500 2,200.00 5,500.00
JUMLAH HARGA BAHAN 75,491.25
C PERALATAN
JUMLAH HARGA PERALATAN
8. PEMASANGAN 1M2 DINDING BATA RINGAN UK (10X20X60) DENGAN MORTAR SIAP PAKAI
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
1 Pekerja L.01 OH 0.300 75,000.00 22,500.00
2 Tukang L.02 OH 0.100 85,000.00 8,500.00
3 Kepala Tukang L.03 OH 0.010 90,000.00 900.00
4 Mandor L.04 OH 0.010 98,000.00 980.00
JUMLAH TENAGA KERJA 32,880.00
B. BAHAN
1 Bata Ringan t=10 cm BH 8.400 9,000.00 75,600.00
2 Mortar Siap Pakai kg 2.500 2,200.00 5,500.00
JUMLAH HARGA BAHAN 81,100.00
C PERALATAN
JUMLAH HARGA PERALATAN
B. BAHAN
1 Hollow 35.35 m1 3.500 7,500.00 26,250.00
2 kalsiboard lbr 0.347 51,500.00 17,870.50
3 Paku skrup kg 0.110 14,500.00 1,595.00
JUMLAH HARGA BAHAN 45,715.50
C PERALATAN
JUMLAH HARGA PERALATAN
B. BAHAN
1 Kayu 3/5 m3 0.00525 5,790,000.00 30,397.50
2 kalsiboard lbr 0.347 51,500.00 17,870.50
3 Paku skrup kg 0.110 14,500.00 1,595.00
JUMLAH HARGA BAHAN 49,863.00
C PERALATAN
JUMLAH HARGA PERALATAN
B. BAHAN
1 kalsiboard lbr 0.347 51,500.00 17,870.50
2 Paku skrup kg 0.110 14,500.00 1,595.00
JUMLAH HARGA BAHAN 19,465.50
C PERALATAN
JUMLAH HARGA PERALATAN
B. BAHAN
1 Paving stone 20x20x5cm m2 25.0000 2,500.00 62,500.00
JUMLAH HARGA BAHAN 62,500.00
C PERALATAN
JUMLAH HARGA PERALATAN
B. BAHAN
1 Asbes gelombang (1.05mx3.00mx4mm) lbr 0.35 99,850.00 34,947.50
2 Paku kg 0.12 17,500.00 2,100.00
JUMLAH HARGA BAHAN 37,047.50
C PERALATAN
JUMLAH HARGA PERALATAN
B. BAHAN
1 Atap Zincalume (Spandek) m2 1.05 50,000.00 52,500.00
2 Sekrup + Karet bh 4.00 750.00 3,000.00
JUMLAH HARGA BAHAN 55,500.00
C PERALATAN
JUMLAH HARGA PERALATAN
B. BAHAN
1 Asbes wuwung gelombang kecil bh 1.200 41,500.00 49,800.00
2 Paku kg 0.040 17,500.00 700.00
JUMLAH HARGA BAHAN 49,800.00
C PERALATAN
JUMLAH HARGA PERALATAN
B. BAHAN
1 Talang Galvalum L:60cm 0.25 m1 1.050 30,000.00 31,500.00
2 Paku kg 0.040 17,500.00 700.00
JUMLAH HARGA BAHAN 31,500.00
C PERALATAN
JUMLAH HARGA PERALATAN
B. BAHAN
1 Bubung Genteng Beton bh 3.500 4,700.00 16,450.00
JUMLAH HARGA BAHAN 16,450.00
C PERALATAN
JUMLAH HARGA PERALATAN
B. BAHAN
1 Bubung Genteng Mantili bh 3.500 3,200.00 11,200.00
JUMLAH HARGA BAHAN 11,200.00
C PERALATAN
JUMLAH HARGA PERALATAN
B. BAHAN
1 Usuk C 0.75 Galvalume m1 1.050 12,000.00 12,600.00
2 Baut Hexa bh 4.000 500.00 2,000.00
JUMLAH HARGA BAHAN 14,600.00
C PERALATAN
JUMLAH HARGA PERALATAN
16. PEMBUATAN DAN PEMASANGAN 1 m3 KUSEN PINTU DAN KUSEN JENDELA, KAYU KELAS II DAN III
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
1 Pekerja L.01 OH 6.00 75,000.00 450,000.00
2 Tukang kayu L.02 OH 18.00 85,000.00 1,530,000.00
3 Kepala Tukang kayu L.03 OH 1.80 90,000.00 162,000.00
4 Mandor L.04 OH 0.30 98,000.00 29,400.00
JUMLAH TENAGA KERJA 2,171,400.00
B. BAHAN
1 Kayu kruing usuk m3 1.10 5,790,000.00 6,369,000.00
2 Paku kg 1.25 17,500.00 21,875.00
3 Lem kayu kg 1.00 15,000.00 15,000.00
JUMLAH HARGA BAHAN 6,405,875.00
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A+B+C) Rp 8,577,275.00
E HARGA SATUAN PEKERJAAN / M3 Rp 8,577,275.00
17. PEMASANGAN 1 m3 KONSTROKSI KUDA KUDA KONVENSIONAL , KAYU KELAS I,II,III BENTANG 6m
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
1 Pekerja L.01 OH 4.000 75,000.00 300,000.00
2 Tukang kayu L.02 OH 12.000 85,000.00 1,020,000.00
3 Kepala Tukang Kayu L.03 OH 1.200 90,000.00 108,000.00
4 Mandor L.04 OH 0.200 98,000.00 19,600.00
JUMLAH TENAGA KERJA 1,447,600.00
B. BAHAN
1 Kayu Kruing /terentang ( Usuk) m3 1.1000 7,295,000.00 8,024,500.00
2 Paku kg 5.6000 17,500.00 98,000.00
JUMLAH HARGA BAHAN 8,122,500.00
C PERALATAN
JUMLAH HARGA PERALATAN
18. MEMBUAT 1 M2 DAUN PINTU KAYU LAPIS (Triplek Melamin) RANGKAP, RANGKA TERTUTUP KAYU KELAS II
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
1 Pekerja L.01 OH 0.500 75,000.00 37,500.00
2 Tukang kayu L.02 OH 1.850 85,000.00 157,250.00
3 Kepala Tukang kayu L.03 OH 0.210 90,000.00 18,900.00
4 Mandor L.04 OH 0.035 98,000.00 3,430.00
JUMLAH TENAGA KERJA 217,080.00
B. BAHAN
1 Kayu Meranti (usuk) m3 0.011 5,790,000.00 63,690.00
2 Paku kg 0.030 17,500.00 525.00
3 Lem Kayu kg 0.250 15,000.00 3,750.00
4 Triplek Tebal 3 mm, Uk. (90 x 2.00 ) cm lbr 0.556 60,000.00 33,333.33
JUMLAH HARGA BAHAN 101,298.33
C PERALATAN
JUMLAH HARGA PERALATAN
B. BAHAN
paku kg 0.1500 17,500.00 2,625.00
JUMLAH HARGA BAHAN 2,625.00
C PERALATAN
JUMLAH HARGA PERALATAN
B. BAHAN
1 Kunci pintu bh 1.0000 70,000.00 70,000.00
JUMLAH HARGA BAHAN 70,000.00
C PERALATAN
JUMLAH HARGA PERALATAN
B. BAHAN
1 Engsel 4" bh 1.0000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 20,000.00
C PERALATAN
JUMLAH HARGA PERALATAN
C PERALATAN
JUMLAH HARGA PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A+B+C) Rp 21,199.00
E HARGA SATUAN PEKERJAAN / BH Rp 21,199.00
22. PEMASANGAN 1 BH KAIT ANGIN
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
1 Pekerja L.01 OH 75,000.00 -
2 Tukang kayu L.02 OH 0.200 85,000.00 17,000.00
3 Kepala Tukang kayu L.03 OH 0.020 90,000.00 1,800.00
4 Mandor L.04 OH 98,000.00 -
JUMLAH TENAGA KERJA 18,800.00
B. BAHAN
1 Kait angin bh 1.0000 14,000.00 14,000.00
JUMLAH HARGA BAHAN 14,000.00
C PERALATAN
JUMLAH HARGA PERALATAN
C PERALATAN
JUMLAH HARGA PERALATAN
B. BAHAN
1 Kayu Meranti (usuk) m3 0.0140 5,790,000.00 81,060.00
2 Lem Kayu kg 0.3000 15,000.00 4,500.00
3 Kaca Polos 3mm m2 1.1000 100,000.00 110,000.00
JUMLAH HARGA BAHAN 195,560.00
C PERALATAN
JUMLAH HARGA PERALATAN
B. BAHAN
1 Pasir Pasang m3 0.028 280,000.00 7,840.00
2 Portlan Cement (40 Kg) kg 3.936 1,250.00 4,920.00
JUMLAH HARGA BAHAN 12,760.00
C PERALATAN
JUMLAH HARGA PERALATAN
B. BAHAN
1 Mortar Siap Pakai kg 3.250 2,200.00 7,150.00
JUMLAH HARGA BAHAN 7,150.00
C PERALATAN
JUMLAH HARGA PERALATAN
B. BAHAN
1 keramik 40/40 cm Motif bh 6.857 7,500.00 51,427.50
2 Pasir pasang m3 0.045 280,000.00 12,600.00
3 Semen PC kg 10.000 1,250.00 12,500.00
4 Semen warna kg 1.620 2,000.00 3,240.00
JUMLAH BAHAN 79,767.50
C PERALATAN
JUMLAH HARGA PERALATAN
B. BAHAN
1 Batu kumbung 27/27 cm bh 27.000 10,000.00 270,000.00
2 Pasir pasang m3 0.246 280,000.00 68,880.00
3 Semen PC kg 136.000 1,250.00 170,000.00
JUMLAH BAHAN 508,880.00
C PERALATAN
JUMLAH HARGA PERALATAN
24. PENGECATAN 1 M2 TEMBOK BARU ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
1 Pekerja L.01 OH 0.020 75,000.00 1,500.00
2 Tukang batu L.02 OH 0.063 85,000.00 5,355.00
3 Kepala Tukang batu L.03 OH 0.0063 90,000.00 567.00
4 Mandor L.04 OH 0.0030 98,000.00 294.00
JUMLAH TENAGA KERJA 7,716.00
B. BAHAN
1 Plamuur kg 0.10 18,000.00 1,800.00
2 Cat dasar kg 0.10 20,000.00 2,000.00
3 Cat penutup kg 0.26 20,000.00 5,200.00
JUMLAH HARGA BAHAN 9,000.00
C PERALATAN
JUMLAH HARGA PERALATAN
B. BAHAN
1 Vernis L 0.15 38,000.00 5,700.00
2 Dempul Kg 0.05 42,000.00 2,100.00
3 Ampelas Lbr 0.10 6,700.00 670.00
JUMLAH HARGA BAHAN 8,470.00
C PERALATAN
JUMLAH HARGA PERALATAN
B. BAHAN
1 Cat Tembok interior kg 0.26 20,000.00 5,200.00
JUMLAH HARGA BAHAN 5,200.00
C PERALATAN
JUMLAH HARGA PERALATAN