TH ANGGARAN : 2021
NO URAIAN PEKERJAAN
II PEKERJAAN PONDASI
X PEKERJAAN CAT
XV PEKERJAAN AKHIR
Total
PPN 10 %
JUMLAH TOTAL
PEMBULATAN
TERBILANG
Nama
jabatan
BILL OF QUANTITY (BOQ)
TH ANGGARAN : 2021
2 Pondasi tapak ( TP 1 )
a Urugan Pasir 2.65 m³ Rp -
b Lantai kerja Beton K 175 2.65 m³ Rp -
c Pembesian 2,079.49 kg Rp -
d Bekisting 211.68 m² Rp -
e Beton K-250 ( Ready Mix ) 15.88 m³ Rp -
3 Stump ( TP 1 )
a Pembesian 916.17 kg Rp -
b Bekisting 38.88 m² Rp -
c Beton K-250 ( Ready Mix ) 3.89 m³ Rp -
4 Pondasi tapak ( TP 2 )
a Urugan Pasir 0.32 m³ Rp -
b Lantai kerja Beton K 175 0.32 m³ Rp -
c Pembesian 388.25 kg Rp -
d Bekisting 9.60 m² Rp -
e Beton K-250 ( Ready Mix ) 1.92 m³ Rp -
5 Stump ( TP 2 )
a Pembesian 113.63 kg Rp -
b Bekisting 14.40 m² Rp -
c Beton K-250 ( Ready Mix ) 1.44 m³ Rp -
6 Sloof S1
a Pembesian 3,345.08 kg Rp -
b Bekisting 162.00 m² Rp -
c Beton K-250 ( Ready Mix ) 24.30 m³ Rp -
7 Sloof S2
a Pembesian 881.05 kg Rp -
b Bekisting 27.72 m² Rp -
c Beton K-250 ( Ready Mix ) 2.77 m³ Rp -
Rp -
III PEKERJAAN STRUKTUR
1 Kolom K1 ( 400 x 400 )
a Pembesian 4,511.60 kg Rp -
b Bekisting 302.40 m² Rp -
c Beton K-250 ( Ready Mix ) 30.24 m³ Rp -
8 Plat Lantai 2 ,T = 12 cm
a Bekisting 333.00 m² Rp -
b Beton K-250 ( Ready Mix ) 43.20 m³ Rp -
c Pembesian 4,438.80 kg Rp -
Rp -
XII PEKERJAAN PENUTUP LANTAI
a Keramik 60 x60 Anti Gores 546.00 m² Rp -
b Kramik 30 x 30 Lantai wc 24.96 m² Rp -
c Kramik 60 x 60 Lantai wc 54.76 m² Rp -
d Kramik Dinding Wc 30 X 60 cm Tinggi 1.5 Meter 175.24 m² Rp -
Jumlah Rp -
XIII PEKERJAAN SANITASI DAN SANITAIR
a Wastafel 18.00 Bh Rp -
b Cermin Dinding Uk 1,8 x 1,2 m 4.00 Bh Rp -
c Kran Air Stainless 18.00 Bh Rp -
d Pemasangan Pipa 3/4" Instalasi Air Bersih 24.00 M¹ Rp -
e Pemasangan Pipa 1" Instalasi Air Bersih 65.00 M¹ Rp -
f Pemasangan Pipa 2,5" Instalasi Air Kotor 60.00 M¹ Rp -
g Pemasangan Pipa 3" Instalasi Air Kotor 45.00 M¹ Rp -
h Bak Mandi Fiber 10.00 Bh Rp -
i Handle Stainless KM Difabel 2.00 Bh Rp -
j Pintu Box Shaft 2.00 Bh Rp -
k Jet Washer 2.00 Bh Rp -
l Floor Drain Stainless 12.00 Bh Rp -
m Sumur Dangkal Buis Beton 1 m Luar 1.00 Unit Rp -
n Sumur Resapan + Aksesoris 2.00 Unit Rp -
o Kloset Duduk Automatis + Aksesoris 2.00 Bh Rp -
p Kloset Jongkok 10.00 Bh Rp -
q Septictank + Resapan 2.00 Unit Rp -
Jumlah Rp -
XIV PEKERJAAN MEKANIKAL ELEKTRIKAL
a Meteran Listrik 16 A 1.00 Unit Rp -
b Instalasi Listrik 152.00 Titik Rp -
Kap Lampu Neon Rm 2 x 18 = 2 x 18 Watt Philips Panjang 120 Cm Led 18 Wat (
c 54.00 Bh Rp -
Ruang Kelas
d Lampu LED 10 Watt ( Termasuk Sarang Piting ) Teras 50.00 Bh Rp -
e MCB 10A 10.00 Bh Rp -
f Proteksi Petir 3.00 Unit Rp -
g Apar 5 kg Alat Pemadam Api Ringan - Fire Extinguisher + Kedudukannya 10.00 Bh Rp -
Rp -
XV PEKERJAAN AKHIR
a Pembersihan Lokasi Kerja( Sisa - Sisa Puing Material ) 1.00 Ls Rp -
Rp -
ANALISA HARGA SATUAN
Jumlah Harga = Rp -
Overhead & Profit 10% = Rp -
Jumlah Total = Rp -
0.0300 OH Pekerja Rp - = Rp -
0.0100 OH Tukang Rp - = Rp -
0.0050 OH Kepala Tukang Rp - = Rp -
0.0010 OH Mandor Rp - = Rp -
Jumlah Harga = Rp -
Overhead & Profit 10% = Rp -
Jumlah Total = Rp -
1.000 m2 Pasang Bekisting Untuk Pondasi pile cap
0.52 Oh Rp - = Rp -
0.26 Oh Pekerja Rp - = Rp -
0.03 Oh Tukang Kayu Rp - = Rp -
0.01 Oh Kepala Tukang Rp - = Rp -
Mandor
0.04 M3 Rp - = Rp -
0.30 Kg Kayu Kelas III Rp - = Rp -
0.10 Ltr Paku Biasa Rp 20,212.00 = Rp 2,021.20
Rp 2,021.20
Rp 1,010.60
PEMAKAIAN CETAKAN 2 X PAKAI
Jumlah Harga = Rp 1,010.60
Overhead & Profit 10% = Rp 101.06
Jumlah Total = Rp 1,111.66
0.30 Oh Pekerja Rp - = Rp -
0.26 Oh Tukang Kayu Rp - = Rp -
0.03 Oh Kepala Tukang Rp - = Rp -
0.01 Oh Mandor Rp - = Rp -
0.32 Oh Pekerja Rp - = Rp -
0.33 Oh Tukang Kayu Rp - = Rp -
0.03 Oh Kepala Tukang Rp - = Rp -
0.01 Oh Mandor Rp - = Rp -
BAHAN
1.02 m3 Ready Mixed K-250 Rp - = Rp -
ALAT
0.10 Hari Vibro Concrete Rp 41,500.00 = Rp 4,150.00
UPAH
1.00 oh Pekerja Rp - = Rp -
0.25 oh Tukang Batu Rp - = Rp -
0.03 oh Kepala Tukang Rp - = Rp -
0.10 oh Mandor Rp - = Rp -
JUMLAH Rp 4,150.00
0.30 Oh Pekerja Rp - = Rp -
0.33 Oh Tukang Kayu Rp - = Rp -
0.03 Oh Kepala Tukang Rp - = Rp -
0.01 Oh Mandor Rp - = Rp -
1.00 m3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (10±2)cm, w/c = 0,66
BAHAN
326.00 Kg Portland Semen Rp - = Rp -
760.00 Kg Pasir Beton Rp - = Rp -
1029.00 Kg batu pecah (maksimum 30 mm) Rp - = Rp -
UPAH
1.65 OH Pekerja Rp - = Rp -
0.25 OH Tukang Batu Rp - = Rp -
0.03 OH Kepala Tukang Rp - = Rp -
0.08 OH Mandor Rp - = Rp -
JUMLAH Rp -
Jumlah Harga = Rp -
Overhead & Profit 10% = Rp -
Jumlah Total = Rp -
1.00 m3 Galian Tanah Biasa
0.75 OH Pekerja Rp - = Rp -
0.03 OH Mandor Rp - = Rp -
JUMLAH ( A ) Rp -
Jumlah Harga = Rp -
Overhead & Profit 10% = Rp -
Jumlah Total = Rp -
BAHAN
1.20 m3 Pasir Urug Rp - = Rp -
UPAH
0.30 OH Pekerja Rp - = Rp -
0.01 OH Mandor Rp - = Rp -
JUMLAH ( A ) Rp -
Jumlah Harga = Rp -
Overhead & Profit 10% = Rp -
Jumlah Total = Rp -
BAHAN
1.20 m3 Tanah pilihan Rp - = Rp -
UPAH
0.25 oh Pekerja Rp - = Rp -
0.01 oh Mandor Rp - = Rp -
JUMLAH ( A ) Rp -
Jumlah Harga = Rp -
Overhead & Profit 10% = Rp -
Jumlah Total = Rp -
0.20 OH Pekerja Rp - = Rp -
0.15 OH Tukang batu Rp - = Rp -
0.02 OH Kepala Tukang Rp - = Rp -
0.01 OH Mandor Rp - = Rp -
JUMLAH ( A ) Rp -
Jumlah Harga = Rp -
Overhead & Profit 10% = Rp -
Jumlah Total = Rp -
1.00 m3 Pasangan Batu Belah
1.500 OH Pekerja Rp - = Rp -
0.750 OH Tukang Rp - = Rp -
0.075 OH Kepala Tukang Rp - = Rp -
0.075 OH Mandor Rp - = Rp -
Jumlah Harga = Rp -
Overhead & Profit 10% = Rp -
Jumlah Total = Rp -
0.192 OH Pekerja Rp - = Rp -
0.019 OH Mandor Rp - = Rp -
JUMLAH ( A ) Rp -
Jumlah Harga = Rp -
Overhead & Profit 10% = Rp -
Jumlah Total = Rp -
ANALISA HARGA SATUAN KEGIATAN KONSTRUKSI
STANDAR NASIONAL INDONESIA (SNI)
Tahun : 2017
A. TENAGA
1 Tukang OH 0.150 Rp - Rp -
2 Kepala tukang OH 0.015 Rp - Rp -
3 Mandor OH 0.018 Rp - Rp -
4 Pekerja OH 0.350 Rp - Rp -
B. BAHAN
1 Bata Merah buah 70.000 Rp - Rp -
2 PC Kg 14.260 Rp - Rp -
3 Pasir pasang m3 0.093 Rp - Rp -
Jumlah Harga Rp -
Overhead & Profit 10% Rp -
Jumlah Total Rp -
A. TENAGA
1 Tukang OH 0.200 Rp - Rp -
2 Kepala tukang OH 0.015 Rp - Rp -
3 Pekerja OH 0.200 Rp - Rp -
4 Mandor OH 0.010 Rp - Rp -
B. BAHAN
1 PC kg 6.240 Rp - Rp -
2 Pasir pasang m3 0.024 Rp - Rp -
Jumlah Harga Rp -
Overhead & Profit 10% Rp -
Jumlah Total Rp -
A. TENAGA
1 Tukang OH 0.100 Rp - Rp -
2 Kepala tukang OH 0.010 Rp - Rp -
3 Pekerja OH 0.150 Rp - Rp -
4 Mandor OH 0.010 Rp - Rp -
B. BAHAN
1 PC kg 3.250 Rp - Rp -
Jumlah Harga Rp -
Overhead & Profit 10% Rp -
Jumlah Total Rp -
JENIS PEKERJAAN : pintu P1 (Dua Daun Steel Door + Kaca Piber T 8 mm ) + Frame Steel ( Finishing Cat ) Uk 120 x 245
SATUAN PEKERJAAN : Unit
HARGA SATUAN : Rp -
TENAGA
A. TENAGA
1 Pekerja OH 1.100 Rp - Rp -
1 Mandor OH 0.500 Rp - Rp -
B. BAHAN
pintu P2 (Dua Daun Steel Door + Kaca Piber T 8 mm +
1 Lengkap Penggantung / Aksessoris ) + Frame Steel ( Unit 1.000 Rp - Rp -
Finishing Cat ) Uk 120 x 245
Jumlah Harga Rp -
Overhead & Profit 10% Rp -
Jumlah Total Rp -
JENIS PEKERJAAN : pintu P2 (Satu Daun Steel Door + Kaca Piber T 8 mm ) + Frame Steel ( Finishing Cat ) Uk 80 x 245
SATUAN PEKERJAAN : Unit
HARGA SATUAN : Rp -
TENAGA
A. TENAGA
1 Pekerja OH 0.500 Rp - Rp -
1 Mandor OH 0.200 Rp - Rp -
B. BAHAN
Pintu Panel Alumunium P3 (Bingkai Alumunium +
1 Unit 1.000 Rp - Rp -
Pengunci Dalam + Hendle + Engsel Stainlesteel )
Jumlah Harga Rp -
Overhead & Profit 10% Rp -
Jumlah Total Rp -
TENAGA
A. TENAGA
1 Pekerja OH 0.500 Rp - Rp -
1 Mandor OH 0.200 Rp - Rp -
B. BAHAN
Pintu Panel Alumunium P3 (Bingkai Alumunium +
1 Unit 1.000 Rp - Rp -
Pengunci Dalam + Hendle + Engsel Stainlesteel )
Jumlah Harga Rp -
Overhead & Profit 10% Rp -
Jumlah Total Rp -
JENIS PEKERJAAN : Jendela Kaca Polos + Kusen Alumunium J1 Lengkap Hendle + Pengunci + Engsel
SATUAN PEKERJAAN : Unit
HARGA SATUAN : Rp -
B. BAHAN
Jendela Kaca Polos + Kusen Alumunium J1 Lengkap
4 Unit 1.000 Rp - Rp -
Hendle + Pengunci + Engsel
Jumlah Harga Rp -
Overhead & Profit 10% Rp -
Jumlah Total Rp -
JENIS PEKERJAAN : Tralis Besi Jendela J1
SATUAN PEKERJAAN : M2
HARGA SATUAN : Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.500 Rp - Rp -
2 Mandor OH 0.200 Rp - Rp -
B. BAHAN
1 Tralis Besi Jendela J1 M2 1.000 Rp - Rp -
2 Baut Pisher Btg 10.000 Rp - Rp -
Jumlah Harga Rp -
Overhead & Profit 10% Rp -
Jumlah Total Rp -
A. TENAGA
1 Pekerja OH 0.020 Rp 100,000.00 Rp 2,000.00
2 Tukang OH 0.063 Rp - Rp -
3 Kepala Tukang OH 0.063 Rp 130,000.00 Rp 8,190.00
4 Mandor OH 0.003 Rp 150,000.00 Rp 375.00
B. BAHAN
1 Cat Sealer /dasar kg 0.100 Rp - Rp -
2 Cat Weathershield kg 0.180 Rp - Rp -
3 kuas Rol bh 0.010 Rp - Rp -
A. TENAGA
1 Pekerja OH 0.020 Rp 100,000.00 Rp 2,000.00
2 Tukang OH 0.063 Rp - Rp -
3 Kepala Tukang OH 0.063 Rp 130,000.00 Rp 8,190.00
4 Mandor OH 0.003 Rp 150,000.00 Rp 375.00
B. BAHAN
1 Pelitur Kg 0.100 Rp - Rp -
2 Thinner liter 0.260 Rp - Rp -
3 Amplas lbr 1.450 Rp - Rp -
4 Kuas 3" bh 0.100 Rp - Rp -
5 wood filler kg 0.200 Rp - Rp -
A. TENAGA
1 Pekerja OH 0.020 Rp 100,000.00 Rp 2,000.00
2 Tukang OH 0.063 Rp - Rp -
3 Kepala Tukang OH 0.063 Rp 130,000.00 Rp 8,190.00
4 Mandor OH 0.003 Rp 150,000.00 Rp 375.00
B. BAHAN
1 Cat zincromat Kg 0.100 Rp - Rp -
2 Cat Minyak Anti Karat Kg 0.100 Rp - Rp -
3 Amplas lbr 1.450 Rp - Rp -
4 Kuas 3" bh 0.100 Rp - Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.500 Rp 100,000.00 Rp 50,000.00
2 Tukang OH 0.500 Rp - Rp -
3 Kepala tukang OH 0.250 Rp 130,000.00 Rp 32,500.00
4 Mandor OH 0.100 Rp 150,000.00 Rp 15,000.00
B. BAHAN
4 Kloset Jongkok Merek Toto UNIT 1.000 Rp - Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.500 Rp 100,000.00 Rp 50,000.00
2 Mandor OH 0.100 Rp 150,000.00 Rp 15,000.00
B. BAHAN
4 Kloset Duduk Merek Toto ( Lengkap Aksessoris UNIT 1.000 Rp - Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.010 Rp 100,000.00 Rp 1,000.00
2 Tukang OH 0.100 Rp - Rp -
3 Kepala tukang OH 0.010 Rp 130,000.00 Rp 1,300.00
4 Mandor OH 0.005 Rp 150,000.00 Rp 750.00
B. BAHAN
1 Floor Drain UNIT 1.000 Rp - Rp -
2 Perlengkapan LS 12 % x Floor Drain
Rp - Rp -
Jumlah Harga Rp 3,050.00
Overhead & Profit 10% Rp 305.00
Jumlah Total Rp 3,355.00
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.500 Rp 100,000.00 Rp 50,000.00
2 Mandor OH 0.060 Rp 150,000.00 Rp 9,000.00
B. BAHAN
Wastafel Unit 1.000 Rp - Rp -
Perlengkapan Ls 12 % x Wastafel Rp - Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.010 Rp 100,000.00 Rp 1,000.00
2 Tukang OH 0.100 Rp - Rp -
3 Kepala tukang OH 0.010 Rp 130,000.00 Rp 1,300.00
4 Mandor OH 0.010 Rp 150,000.00 Rp 1,500.00
B. BAHAN
1 Kran Air Stainless Steel minimalis Ex. Onda bh 1.000 Rp - Rp -
2 perlengkapan 10% harga bahan 0.100 Rp - Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.036 Rp 100,000.00 Rp 3,600.00
2 Tukang OH 0.060 Rp - Rp -
3 Kepala tukang OH 0.006 Rp 130,000.00 Rp 780.00
4 Mandor OH 0.002 Rp 150,000.00 Rp 300.00
B. BAHAN
1 Pipa PVC Ø ¾" M 1.200 Rp - Rp -
2 Perlengkapan LS 35 % x Pipa Rp - Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.036 Rp 100,000.00 Rp 3,600.00
2 Tukang OH 0.060 Rp - Rp -
3 Kepala tukang OH 0.006 Rp 130,000.00 Rp 780.00
4 Mandor OH 0.002 Rp 150,000.00 Rp 300.00
B. BAHAN
1 Pipa PVC Ø 1" M1 1.200 Rp - Rp -
2 Perlengkapan LS 35 % x Pipa Rp - Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.081 Rp 100,000.00 Rp 8,100.00
2 Tukang OH 0.135 Rp - Rp -
3 Kepala tukang OH 0.014 Rp 130,000.00 Rp 1,755.00
4 Mandor OH 0.004 Rp 150,000.00 Rp 600.00
B. BAHAN
1 Pipa PVC Ø 2,5" M1 1.200 Rp - Rp -
2 Perlengkapan LS 35 % x Pipa Rp - Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.081 Rp 100,000.00 Rp 8,100.00
2 Tukang OH 0.135 Rp - Rp -
3 Kepala tukang OH 0.014 Rp 130,000.00 Rp 1,755.00
4 Mandor OH 0.004 Rp 150,000.00 Rp 600.00
B. BAHAN
1 Pipa PVC Ø 3" M1 1.200 Rp - Rp -
2 Perlengkapan LS 35 % x Pipa Rp - Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.081 Rp 100,000.00 Rp 8,100.00
2 Tukang OH 0.135 Rp - Rp -
3 Kepala tukang OH 0.014 Rp 130,000.00 Rp 1,755.00
4 Mandor OH 0.004 Rp 150,000.00 Rp 600.00
B. BAHAN
1 Pipa PVC Ø 3" M1 1.200 Rp - Rp -
2 Perlengkapan LS 35 % x Pipa Rp - Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.500 Rp 100,000.00 Rp 50,000.00
#### Mandor OH 0.250 Rp 150,000.00 Rp 37,500.00
B. BAHAN
1 Handle Stainless Difabel BH 1.200 Rp - Rp -
2 Perlengkapan LS 35 % x Pipa Rp - Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 1.000 Rp 100,000.00 Rp 100,000.00
2 Mandor OH 0.200 Rp 150,000.00 Rp 30,000.00
B. BAHAN
1 Sumur Dangkal Buis Beton Diameter 1 m LS 1.000 Rp - Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 1.200 Rp 100,000.00 Rp 120,000.00
2 Mandor OH 0.750 Rp 150,000.00 Rp 112,500.00
B. BAHAN
1 Sumur Resapan LS 1.000 Rp - Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 1.200 Rp 100,000.00 Rp 120,000.00
2 Mandor OH 0.750 Rp 150,000.00 Rp 112,500.00
B. BAHAN
1 Safty Tank LS 1.000 Rp - Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.250 Rp 100,000.00 Rp 25,000.00
2 Tukang OH 0.120 Rp - Rp -
3 Kepala tukang OH 0.012 Rp 130,000.00 Rp 1,560.00
4 Mandor OH 0.013 Rp 150,000.00 Rp 1,875.00
B. BAHAN
1 Keramik 60/60 Anti Gores Bh 2.780 Rp - Rp -
Semen Kg 8.360 Rp - Rp -
Pasir Pasang M3 0.023 Rp - Rp -
2 Semen Warna Kg 0.900 Rp - Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.250 Rp 100,000.00 Rp 25,000.00
2 Tukang OH 0.120 Rp - Rp -
3 Kepala tukang OH 0.012 Rp 130,000.00 Rp 1,560.00
4 Mandor OH 0.013 Rp 150,000.00 Rp 1,875.00
B. BAHAN
1 Keramik 30/30 Bh 11.000 Rp - Rp -
Semen Kg 9.300 Rp - Rp -
Pasir Pasang M3 0.018 Rp - Rp -
2 Semen Warna Kg 0.060 Rp - Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.250 Rp 100,000.00 Rp 25,000.00
2 Tukang OH 0.120 Rp - Rp -
3 Kepala tukang OH 0.012 Rp 130,000.00 Rp 1,560.00
4 Mandor OH 0.013 Rp 150,000.00 Rp 1,875.00
B. BAHAN
1 Keramik 30/60 Bh 6.000 Rp - Rp -
2 Semen Kg 8.360 Rp - Rp -
3 Pasir Pasang M3 0.023 Rp - Rp -
4 Semen Warna Kg 0.900 Rp - Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.060 Rp 100,000.00 Rp 6,000.00
2 Tukang OH 0.006 Rp - Rp -
3 Kepala tukang OH 0.060 Rp 130,000.00 Rp 7,800.00
4 Mandor OH 0.000 Rp 150,000.00 Rp 45.00
B. BAHAN
1 Iwf 250 x 150 Kg 1.100 Rp - Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.060 Rp 100,000.00 Rp 6,000.00
2 Tukang OH 0.006 Rp - Rp -
3 Kepala tukang OH 0.060 Rp 130,000.00 Rp 7,800.00
4 Mandor OH 0.000 Rp 150,000.00 Rp 45.00
B. BAHAN
1 Cnp 100 x 50 x 20 x 2,3 Kg 1.100 Rp - Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.007 Rp 100,000.00 Rp 700.00
2 Tukang OH 0.007 Rp - Rp -
3 Kepala tukang OH 0.001 Rp 130,000.00 Rp 91.00
4 Mandor OH 0.000 Rp 150,000.00 Rp 45.00
B. BAHAN
1 Plat Baja Tebal = 12 mm x 1,2 x 2,4 Kg 1.050 Rp - Rp -
Kawat Las LB 52 4 mm Kg 0.015 Rp - Rp -
C Alat Bantu
1 Sewa Mesin Las 0.020 Rp 250,000.00 Rp 5,000.00
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.200 Rp 100,000.00 Rp 20,000.00
2 Tukang OH 0.100 Rp - Rp -
3 Kepala tukang OH 0.010 Rp 130,000.00 Rp 1,300.00
4 Mandor OH 0.010 Rp 150,000.00 Rp 1,500.00
B. BAHAN
1 Genteng Betumen Bergelombang Monolayer 3 mm Lbr 3.710 Rp - Rp -
2 Screw Bh 16.129 Rp - Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.050 Rp 100,000.00 Rp 5,000.00
2 Mandor OH 0.010 Rp 150,000.00 Rp 1,500.00
B. BAHAN
1 Triplek 9 mm ( Insulasi ) Lbr 1.000 Rp - Rp -
2 Screw Bh 16.000 Rp - Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.150 Rp 100,000.00 Rp 15,000.00
2 Tukang OH 0.250 Rp - Rp -
3 Kepala tukang OH 0.025 Rp 130,000.00 Rp 3,250.00
4 Mandor OH 0.075 Rp 150,000.00 Rp 11,250.00
B. BAHAN
1 Gypsum t. 9mm Lbr 0.382 Rp - Rp -
2 Rangka Puring Btg 2.000 Rp - Rp -
3 Paku Skrup Kotak 0.050 Rp - Rp -
4 Stoping Zak 0.025 Rp - Rp -
5 Joint Tape Roll 0.025 Rp - Rp -
6 Paku Ramset Set 0.020 Rp - Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.110 Rp 100,000.00 Rp 11,000.00
2 Tukang OH 0.220 Rp - Rp -
3 Kepala tukang OH 0.022 Rp 130,000.00 Rp 2,860.00
4 Mandor OH 0.005 Rp 150,000.00 Rp 750.00
B. BAHAN
1 Listplank GRC M1 1.100 Rp - Rp -
2 Paku Biasa 1/2'-1' Btg 0.050 Rp - Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.150 Rp 100,000.00 Rp 15,000.00
2 Tukang OH 0.300 Rp - Rp -
3 Kepala tukang OH 0.020 Rp 130,000.00 Rp 2,600.00
4 Mandor OH 0.010 Rp 150,000.00 Rp 1,500.00
B. BAHAN
1 Besi hollow 2x1/2 inch m1 4.000 Rp - Rp -
2 Braket besi L T=6mm pj 6-8 cm bh 8.000 Rp - Rp -
3 Angkur Dynabolt Ø10-800 mm kg 0.160 Rp - Rp -
4 Paku sekrup kg 0.060 Rp - Rp -
5 Alumunium composite panel T=0,4m1m m2 1.020 Rp - Rp -
6 Sealant tube 1.650 Rp - Rp -
7 Pekerjaan las listrik cm 3.680 Rp 1,000.00 Rp 3,680.00
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.200 Rp 100,000.00 Rp 20,000.00
2 Tukang OH 0.100 Rp - Rp -
3 Kepala tukang OH 0.010 Rp 130,000.00 Rp 1,300.00
4 Mandor OH 0.010 Rp 150,000.00 Rp 1,500.00
B. BAHAN
1 Rabung Bithumen M1 1.100 Rp - Rp -
2 Screw Bh 12.000 Rp 1,200.00 Rp 14,400.00
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.150 Rp 100,000.00 Rp 15,000.00
2 Mandor OH 0.075 Rp 150,000.00 Rp 11,250.00
B. BAHAN
1 Besi Sag Rod Diameter 10 Panjang 60 cm Ulir ( Lengkap Mor ) Btg 1.000 Rp - Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.004 Rp 100,000.00 Rp 400.00
2 Tukang OH 0.002 Rp - Rp -
3 Kepala tukang OH 0.000 Rp 130,000.00 Rp 26.00
4 Mandor OH 0.000 Rp 150,000.00 Rp 30.00
B. BAHAN
1 Kawat Las Listrik Kg 0.040 Rp - Rp -
2 Minyak Pelumas Liter 0.040 Rp - Rp -
ALAT
1 Las Listrik 250 A Diesel Jam 0.017 Rp 35,000.00 Rp 595.00
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.500 Rp 100,000.00 Rp 50,000.00
2 Tukang OH 0.500 Rp - Rp -
3 Kepala tukang OH 0.500 Rp 130,000.00 Rp 65,000.00
4 Mandor OH 0.100 Rp 150,000.00 Rp 15,000.00
B. BAHAN
1 Kable Bcc 50 mm m1 18.000 Rp - Rp -
2 Coper Rod Btg 1.000 Rp - Rp -
3 Cincin Ring Bh 16.000 Rp - Rp -
4 Moer Baut Tembaga Bh 18.000 Rp - Rp -
5 Klem Tembaga Bh 16.000 Rp - Rp -
6 Tembaga Seputzem Btg 1.000 Rp - Rp -
7 Pipa Gip Panjang 1 m Diameter 1" Btg 1.000 Rp - Rp -
8 Box Terminal Cable 200x100x60 cm Bh 1.000 Rp - Rp -
9 Bak Kontrol 50 x 60 x 5 cm Bh 1.000 Rp - Rp -
10 Serbuk Arang Kg 2.000 Rp - Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.100 Rp 100,000.00 Rp 10,000.00
2 Mandor OH 0.050 Rp 150,000.00 Rp 7,500.00
B. BAHAN
1 Pipa Relling Stainless Steel Diameter 2" M1 1.000 Rp - Rp -
2 Baut Pisher Btg 4.000 Rp - Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
A. TENAGA
1 Pekerja OH 0.200 Rp 100,000.00 Rp 20,000.00
2 Mandor OH 0.500 Rp 150,000.00 Rp 75,000.00
B. BAHAN
1 Besi Hollow 2 x 1" M1 1.000 Rp - Rp -
2 Baut Pisher Btg 6.000 Rp - Rp -
HARGA JUMLAH
NO. KOMPONEN SATUAN KOEF BAHAN /UPAH HARGA
(Rp.) (Rp.)
Jumlah Harga Rp -
Overhead & Profit 10% Rp -
Jumlah Total Rp -
Pas. Batako
UKURAN
NO ITEM P L T LUAS
(M) (M) (M) (M2)
Dikurangi
UKURAN
NO ITEM P L T LUAS
(M) (M) (M) (M2)
K2 3.50 0.90
B1 92.00 0.90
B2 92.00 0.90
B3 92.00 0.40
JUMLAH TOTAL
UKURAN
NO ITEM P L T LUAS
(M) (M) (M) (M2)
JUMLAH TOTAL
UKURAN
NO ITEM P L T LUAS
(M) (M) (M) (M2)
Lt.2
Kls 1,2,3 7.80 4.30 33.54
-
Tangga 7.80 2.80 21.84
JUMLAH TOTAL
UKURAN
NO ITEM P L T LUAS
(M) (M) (M) (M2)
Kurangi
Pintu p2 1.60 2.10 3.36
Pintu p3 1.50 2.10 3.15
Pintu p1 0.90 2.10 1.89
P4 0.70 2.10 1.47
j1 1.50 1.40 2.10
j2 1.20 1.30 1.56
JUMLAH TOTAL
Krmik lt 1
UKURAN
NO ITEM P L T LUAS
(M) (M) (M) (M2)
Krmik lt 2
UKURAN
NO ITEM P L T LUAS
(M) (M) (M) (M2)
JUMLAH TOTAL
Krmik lt 3
UKURAN
NO ITEM P L T LUAS
(M) (M) (M) (M2)
JUMLAH TOTAL
Krmik Lt Wc
UKURAN
NO ITEM P L T LUAS
(M) (M) (M) (M2)
JUMLAH TOTAL
Krmik dinding wc
UKURAN
NO ITEM P L T LUAS
(M) (M) (M) (M2)
JUMLAH TOTAL
JUMLAH TOTAL
JUMLAH TOTAL
JUMLAH TOTAL
Pentelasi Bv
UKURAN
NO ITEM P L T LUAS
(M) (M) (M) (M2)
Kramik
UKURAN
NO ITEM P L T LUAS
(M) (M) (M) (M2)
Lt.2
Kls 1,2,3 7.80 4.30 33.54
-
Tangga 7.80 2.80 21.84
-
Teras 2.80 1.80 5.04
-
Teras 4.30 1.80 7.74
-
2.90 1.80 5.22
-
5.20 1.80 9.36
-
Selasar 91.50 0.80 73.20
JUMLAH TOTAL
KRAMIK DINDING WC
UKURAN
NO ITEM P L T LUAS
(M) (M) (M) (M2)
Lt.2
Dinding 2.90 2.00 5.80
3.10 2.00 6.20
Dinding 68.80 2.00 137.60
Atap Bitumen
UKURAN
NO ITEM P L T LUAS
(M) (M) (M) (M2)
UKURAN
NO ITEM P T LUAS
(KG) (KG) (M) (M2)
1M 29.60 11.84
JUMLAH TOTAL
UKURAN
NO ITEM P T LUAS
(KG) (KG) (M) (M2)
1M 4.97 38.10
Sambungan 4.97 1.20
JUMLAH TOTAL
Plate Tebal 10 mm
UKURAN
NO ITEM P L T Bj
(KG) (KG) (M) (KG)
JUMLAH TOTAL
Lisplank Grc
UKURAN
NO ITEM P L T LUAS
(M) (M) (M) (M2)
6.26 -
38.10
JUMLAH TOTAL
Pengelasan Dengan Las Listrik
UKURAN
NO ITEM P Jlh T LUAS
(M) (M) (M) (M2)
24.00 344.40
28.00 352.80
10.00 91.00
12.00 67.20
12.00 54.60
-
4.00 7.92
4.00 12.96
4.00 14.06
8.00 40.32
24.00 98.40
4.00 14.40
2.00 3.30
2.00 25.00
10.00 139.49
1,265.85
6.00 17.64
-
5.00 6.30
2.00 4.20
-
48.00 80.64
-
6.00 6.28
8.00 3.46
4.00 0.96
119.47
1,146.37 M3
JUMLAH
VOLUME KETERANGAN
KOMULATIF
(M3)
54.00 245.70
-
20.00 63.00
-
1.00 82.80
-
1.00 82.80
-
1.00 36.80
511.10 M2
JUMLAH
VOLUME KETERANGAN
KOMULATIF
(M3)
10.00 88.20
-
34.00 258.40
-
346.60 M2
JUMLAH
VOLUME KETERANGAN
KOMULATIF
(M3)
-
12.00 402.48
-
1.00 21.84
-
12.00 24.96
4.00 36.96
-
4.00 17.80
-
4.00 20.16
-
8.00 61.92
-
4.00 20.88
-
2.00 18.72
1.00 73.20
698.92 M3
JUMLAH
VOLUME KETERANGAN
KOMULATIF
(M3)
1.00 156.00
3.00 58.50
2.00 21.00
1.00 48.00
1.00 28.00
311.50
1.00 3.36
3.00 9.45
1.00 1.89
2.00 2.94
8.00 16.80
2.00 3.12
37.56
273.94 M3
JUMLAH
VOLUME KETERANGAN
KOMULATIF
(M3)
1.00 157.60
-
3.00 0.54
-
1.00 3.00
-
1.00 1.05
4.59
153.01 M3
JUMLAH
VOLUME KETERANGAN
KOMULATIF
(M3)
1.00 157.60
-
-
-
2.00 6.00
-
1.00 2.70
2.00 3.30
12.00
145.60 M3
JUMLAH
VOLUME KETERANGAN
KOMULATIF
(M3)
1.00 157.60
-
-
-
2.00 6.00
-
1.00 2.70
3.00 2.70
11.40
146.20 M3
JUMLAH
VOLUME KETERANGAN
KOMULATIF
(M3)
4.00 9.62
-
9.62 M3
JUMLAH
VOLUME KETERANGAN
KOMULATIF
(M3)
1.00 4.73
1.00 1.47
3.26 M3
JUMLAH
VOLUME KETERANGAN
KOMULATIF
(M3)
6.00 17.64
17.64 M3
JUMLAH
VOLUME KETERANGAN
KOMULATIF
(M3)
4.00 12.60
12.60 M3
JUMLAH
VOLUME KETERANGAN
KOMULATIF
(M3)
10.00 13.65
2.00 3.90
17.55 M3
JUMLAH
VOLUME KETERANGAN
KOMULATIF
(M3)
12.00 5.40
6.00 6.54
4.00 1.00
12.94 M3
JUMLAH
VOLUME KETERANGAN
KOMULATIF
(M3)
12.00 402.48
1.00 21.84
424.32
12.00 24.96
4.00 36.96
4.00 17.80
54.76
-
4.00 20.16
-
8.00 61.92
-
4.00 20.88
-
2.00 18.72
121.68
1.00 73.20
1,299.68 M3
JUMLAH
VOLUME KETERANGAN
KOMULATIF
(M3)
10.00 58.00
2.00 12.40
1.00 137.60
208.00
24.00 32.76
175.24
JUMLAH
VOLUME KETERANGAN
KOMULATIF
(M3)
2.00 486.00
486.00 M3
JUMLAH
VOLUME KETERANGAN
KOMULATIF
(M3)
10.00 3,504.64
3,504.64 M3
JUMLAH
VOLUME KETERANGAN
KOMULATIF
(M3)
24.00 4,541.52
24.00 143.04
4,684.56 M3
JUMLAH
VOLUME KETERANGAN
KOMULATIF
(M3)
20.00 141.30
40.00 282.60
10.00 70.65
10.00 125.60
10.00 117.75
20.00 282.60
1,020.50 M3
JUMLAH
VOLUME KETERANGAN
KOMULATIF
(M3)
4.00 25.04
2.00 76.20
101.24 M3
JUMLAH
VOLUME KETERANGAN
KOMULATIF
(M3)
10.00 750.00
10.00 5,600.00
10.00 1,200.00
10.00 750.00
10.00 480.00
10.00 1,020.00
9,800.00 cm
Pemotongan lahan dan penimbunan
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T TOTL
KOMULATIF
(M) (M) (M) (M2)
Kayu Cerucuk
-
Tapak Tp1 3.00 16.00 48.00 27.00
Tp2 3.00 9.00 27.00 10.00
JUMLAH TOTAL
Urugan Pasir
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
Urugan Pasir
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
Beton Tapak 0.80 0.80 0.30 10.00
JUMLAH TOTAL -
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
Pembesian Sloof S 1
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
Besi Dia 10 mm
Panjang 36.00 10.00 10.00 50.00 1.00
Sambungan 40 cm 0.40 10.00 10.00 50.00 1.00
Lintang 10.00 10.00 10.00 180.00 1.00
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T BANYAK
KOMULATIF
(M) (M) (M) BIDANG
UKURAN JUMLAH
NO ITEM P L T BANYAK
KOMULATIF
(M) (M) (M) BIDANG
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T BANYAK
KOMULATIF
(M) (M) (M) BIDANG
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
Beton Lantai
R.1 8.85 7.85 0.08 1.00
R.2 8.85 7.85 0.08 1.00
R.3 8.85 7.85 0.08 1.00
Wc 7.85 2.85 0.08 2.00
R.Tangga 7.85 2.85 0.08 1.00
Teras 35.85 1.85 0.08 1.00
JUMLAH TOTAL -
LANTAI 1
Pekerjaan Pembesian Kolom K1
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
Beton K 250 K1
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
Beton K 250 K1
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
Beton K 250 Kp
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
JUMLAH TOTAL
Pekerjaan Bekisting B3 lt 1
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
JUMLAH TOTAL
Pekerjaan Bekisting B3 lt 1
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
Pekerjaan Pembesian Lantai Satu
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
Besi Dia 10 mm
Panjang 36.00 10.00 10.00 50.00 2.00
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L Luas BANYAK
KOMULATIF
(M) (M) (M) BIDANG
Lantai 1
R.1 8.80 7.80 1.00
R.2 8.80 7.80 1.00
R.3 8.80 7.80 1.00
Wc 6.80 2.80 2.00
Wc 2.80 2.80 2.00
R.Tangga 7.80 2.80 1.00
Teras 4.30 1.80 6.00
Teras 1.80 2.80 1.00
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
Besi Dia 10 mm
Panjang 2.10 10.00 10.00 5.00 1.00
Pekerjaan Bekisting
UKURAN JUMLAH
NO ITEM P L Luas BANYAK
KOMULATIF
(M) (M) (M) BIDANG
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
Plasteran
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
Acian
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
Pembesian Selasar
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
Besi Dia 10 mm
Panjang 99.00 10.00 10.00 5.33 1.00
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
SALURAN KELILING BANGUNAN
Galian Tanah Pondasi
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
Plasteran
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
Acian
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
Urugan Pasir
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL
Beton Lantai Saluran
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
KOLOM K1
Pekerjaan Bekisting Kolom K1
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
Beton K 250 K1
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
KOLOM PRAKTIS KP
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
Kolom 4.00 0.15 4.00 12.00
JUMLAH TOTAL
Beton K 250 Kp LT 2
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
BALOK B1
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
JUMLAH TOTAL
Pekerjaan Bekisting B2
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
JUMLAH TOTAL
Pekerjaan Bekisting B3 lt 2
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
Besi Dia 10 mm
Panjang 36.00 10.00 10.00 61.00 2.00
Sambungan 40 cm - 10.00 10.00 61.00 2.00
Lintang 12.20 10.00 10.00 180.00 2.00
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L Luas BANYAK
KOMULATIF
(M) (M) (M) BIDANG
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
LANTAI 3
Pekerjaan Pembesian Kolom K1 lt 3
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
Beton K 250 K1 lt 3
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
KOMULATIF
(M) (Φ) (Φ) BESI
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
Beton K 250 Kp lt 3
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
JUMLAH TOTAL -
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
JUMLAH TOTAL
Pekerjaan Bekisting B2 lt 3
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
JUMLAH TOTAL
Pekerjaan Bekisting B2 lt 3
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
Besi Dia 10 mm
Panjang 18.20 10.00 10.00 61.00 2.00
Sambungan 40 cm 0.40 10.00 10.00 61.00 2.00
Lintang 12.20 10.00 10.00 91.00 2.00
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L Luas BANYAK
KOMULATIF
(M) (M) (M) BIDANG
JUMLAH TOTAL
JUMLAH TOTAL -
VOLUME KETERANGAN
(M3)
240.00
67.50
307.50 M3
VOLUME KETERANGAN
(M3)
73.87
73.87 M3
VOLUME KETERANGAN
(M3)
76.00
76.00 M3
VOLUME KETERANGAN
(M1)
-
1,296.00
270.00
1,566.00 M1
VOLUME KETERANGAN
(M3)
2.65
2.65 M3
VOLUME KETERANGAN
(M3)
2.65
2.65 M3
VOLUME KETERANGAN
(KG)
2,079.49
2,079.49
VOLUME KETERANGAN
(M2)
211.68
211.68
VOLUME KETERANGAN
(M3)
15.88
15.88
VOLUME KETERANGAN
(M3)
74.09
VOLUME KETERANGAN
(KG)
916.17
916.17
VOLUME KETERANGAN
(M2)
38.88
38.88
VOLUME KETERANGAN
(M3)
3.89
3.89
VOLUME KETERANGAN
(M3)
12.16
12.16 M3
VOLUME KETERANGAN
(M3)
0.32
0.32 M3
VOLUME KETERANGAN
(M3)
0.32
0.32 M3
VOLUME KETERANGAN
(KG)
388.25
388.25
VOLUME KETERANGAN
(M2)
9.60
9.60
VOLUME KETERANGAN
(M3)
1.92
1.92
VOLUME KETERANGAN
(M3)
7.68
7.68
VOLUME KETERANGAN
(KG)
113.63
113.63
VOLUME KETERANGAN
(M2)
14.40
14.40
VOLUME KETERANGAN
(M3)
1.44
1.44
Pembesian Sloof S 2
UKURAN
VOLUME KETERANGAN NO ITEM P DIA
(KG) (M) (Φ)
UKURAN
VOLUME KETERANGAN NO ITEM P L
(M2) (M) (M)
UKURAN
VOLUME KETERANGAN NO ITEM P L
(M3) (M) (M)
VOLUME KETERANGAN
(KG)
1,109.70
1,109.70
2,219.40
VOLUME KETERANGAN
(M2)
20.84
20.84
20.84
6.71
6.71
19.90
95.85
VOLUME KETERANGAN
(M2)
3.47
3.47
3.47
1.12
1.12
3.32
15.97
VOLUME KETERANGAN
(M2)
69.47
69.47
69.47
44.75
22.37
66.32
341.86
VOLUME KETERANGAN
(M3)
5.56
5.56
5.56
1.79
1.79
5.31
25.56
VOLUME KETERANGAN
(KG)
3,579.45
932.15
4,511.60
VOLUME KETERANGAN
(M2)
302.40
302.40
VOLUME KETERANGAN
(M3)
30.24
30.24
VOLUME KETERANGAN
(KG)
1,060.58
234.76
1,295.34
VOLUME KETERANGAN
(M2)
84.00
84.00
VOLUME KETERANGAN
(M3)
6.30
6.30
VOLUME KETERANGAN
(KG)
310.72
-
838.44
134.23
1,283.39
VOLUME KETERANGAN
(M2)
60.48
163.20
223.68
VOLUME KETERANGAN
(M3)
1.81
4.90
6.71
VOLUME KETERANGAN
(KG)
349.42
96.09
445.51
VOLUME KETERANGAN
(M2)
78.72
78.72
VOLUME KETERANGAN
(M3)
2.36
2.36
VOLUME KETERANGAN
(KG)
4,041.08
785.77
4,826.85
VOLUME KETERANGAN
(M2)
270.28
270.28
VOLUME KETERANGAN
(M3)
23.90
23.90
VOLUME KETERANGAN
(KG)
1,205.46
105.02
351.59
1,662.07
VOLUME KETERANGAN
(M2)
101.84
101.84
VOLUME KETERANGAN
(M3)
4.58
4.58
VOLUME KETERANGAN
(KG)
137.07
31.41
168.48
VOLUME KETERANGAN
(M2)
15.44
15.44
VOLUME KETERANGAN
(M3)
1.16
1.16
VOLUME KETERANGAN
(KG)
325.63
74.62
400.25
VOLUME KETERANGAN
(M2)
36.68
36.68
VOLUME KETERANGAN
(M3)
2.75
2.75
VOLUME KETERANGAN
(KG)
2,219.40
2,219.40
4,438.80
VOLUME KETERANGAN
(M2)
-
68.64
68.64
68.64
38.08
15.68
21.84
46.44
5.04
333.00
VOLUME KETERANGAN
(M3)
43.20
43.20
VOLUME KETERANGAN
(KG)
6.47
7.77
56.96
VOLUME KETERANGAN
(M2)
5.04
5.04
VOLUME KETERANGAN
(M3)
0.60
0.60
VOLUME KETERANGAN
(M3)
2.23
2.23 M3
VOLUME KETERANGAN
(M2)
44.55
44.55
VOLUME KETERANGAN
(M2)
44.55
44.55
VOLUME KETERANGAN
(M2)
44.55
44.55
VOLUME KETERANGAN
(M3)
14.85
3.96
79.20
M3
VOLUME KETERANGAN
(KG)
325.51
325.51
651.02
VOLUME KETERANGAN
(M3)
6.34
6.34
VOLUME KETERANGAN
(M3)
29.70
29.70 M3
VOLUME KETERANGAN
(M2)
118.80
118.80
VOLUME KETERANGAN
(M2)
118.80
118.80
VOLUME KETERANGAN
(M2)
118.80
118.80
VOLUME KETERANGAN
(M3)
1.49
M3
VOLUME KETERANGAN
(M3)
2.97
2.97
VOLUME KETERANGAN
(M2)
VOLUME KETERANGAN
(M3)
VOLUME KETERANGAN
(KG)
178.97
39.15
218.12
VOLUME KETERANGAN
(M2)
28.80
28.80
VOLUME KETERANGAN
(M3)
1.08
1.08
VOLUME KETERANGAN
(KG)
6,286.13
8.84
1,730.56
8,025.52
VOLUME KETERANGAN
(M2)
426.75
426.75
VOLUME KETERANGAN
(M3)
51.21
51.21
VOLUME KETERANGAN
(KG)
439.70
88.33
528.03
VOLUME KETERANGAN
(M2)
20.48
20.48
VOLUME KETERANGAN
(M3)
1.95
1.95
VOLUME KETERANGAN
(KG)
400.56
2.84
129.35
532.74
VOLUME KETERANGAN
(M2)
59.83
59.83
VOLUME KETERANGAN
(M3)
3.76
3.76
VOLUME KETERANGAN
(KG)
2,707.67
2,707.67
5,415.34
VOLUME KETERANGAN
(M2)
160.00
56.00
216.00
VOLUME KETERANGAN
(M3)
19.20
6.72
25.92
VOLUME KETERANGAN
(KG)
VOLUME KETERANGAN
(M2)
VOLUME KETERANGAN
(M3)
VOLUME KETERANGAN
(KG)
113.63
24.86
138.49
VOLUME KETERANGAN
(M2)
18.00
18.00
VOLUME KETERANGAN
(M3)
0.68
0.68
VOLUME KETERANGAN
(KG)
2,527.71
695.87
3,223.58
VOLUME KETERANGAN
(M2)
171.00
171.00
VOLUME KETERANGAN
(M3)
20.52
20.52
VOLUME KETERANGAN
(KG)
563.43
113.19
676.62
VOLUME KETERANGAN
(M2)
26.25
26.25
VOLUME KETERANGAN
(M3)
2.50
2.50
VOLUME KETERANGAN
(KG)
433.23
139.90
573.12
VOLUME KETERANGAN
(M2)
48.00
48.00
VOLUME KETERANGAN
(M3)
5.85
5.85
VOLUME KETERANGAN
(KG)
1,368.88
30.09
1,368.88
2,767.84
VOLUME KETERANGAN
(M2)
160.00
56.00
216.00
VOLUME KETERANGAN
(M3)
19.20
6.72
25.92
JUMLAH
DIA BANYAK VOLUMEKETERANGAN
KOMULATIF
(Φ) BESI (KG)
881.05
JUMLAH
LUAS BANYAK VOLUMEKETERANGAN
KOMULATIF
(M2) BIDANG (M2)
27.72
JUMLAH
T LUAS VOLUMEKETERANGAN
KOMULATIF
(M) (M2) (M3)
- 2.77
DAFTAR HARGA SATUAN BAHAN BANGUNAN
HARGA
NO. J E N I S B A H A N SAT. BAHAN
D PASIR
1 Urug m3
2 Pasang m3
3 Beton m3
E TANAH
1 Tanah Urug m3
2 Tanah Urug Pilihan m3
3 Tanah Timbun Di Datangkan m3
F PORTLAND CEMENT
1 Semen Dinamic 50 kg zak
2 Padang 50 kg zak
3 Semen warna kg
II BAHAN KAYU
A Kayu Kelas III
1 Kayu Kelas II m3
2 Balok Kayu Kelas III m3
3 Kayu Cerucuk Dia 3" Btg
B DOLKEN
1 Sedang 8 x 10 x 400 cm btg
2 Kecil 6 x 7 x 400 cm btg
3 Besar 10 x 12 x 400 cm btg
4 Kayu cetakan m3
5 Kayu bakar m3
6 Bambu btg
V LAIN-LAIN
1 Beneer Lbr
2 Minyak Beton & bekisting ltr
3 Vibro Concrete hari
IX BAHAN BESI
1 Besi Pipa Galvanis 1.5" Kg
2 Kawat Ikat beton/bendrat kg
3 besi beton ulir kg
4 Baja Profil Dan Plat kg
5 Besi Cnp 100 x 50 x 20 x 2,3 kg
6 Besi Profil Iwf 250x150 kg
7 Engsel pintu Besi Diameter 12 mm Bh
8 Besi hollow 2x1/2 inch m1
9 Braket besi L T=6mm pj 6-8 cm bh
10 Angkur Dynabolt Ø10-800 mm kg
11 Angkur Diameter 19 Panjang 60 cm ( Dilas Joint Tulangan Btg
12 Baut Diameter 19 Panjang 2,5" Btg
13 Ikatan Angin/ Bresing ( Lengkap Jarum Keras ) Btg
14 Alumunium composite panel T=0,4m1m m2
15 Sealant tube
16 Kawat Las Listrik Kg
17 Bio Solar Liter
18 Minyak Pelumas Liter
19 Balok Alumunium 2x4" m1
20 Plat Alumunium m2
HARGA
NO. J E N I S B A H A N SAT. BAHAN
XI MEKANIKAL ELEKTRIKAL
1 Meteran Listrik 16 Ampere Unit
2 Lampu Neon Rm 2 x 18 = 2 x 18 Watt Philips Panjang 120 Cm bh
3 Lampu LED 10 Watt ( Termasuk Sarang Piting ) bh
4 Stop Kontak bh
5 Stop Kontak Ac bh
6 Titik Instalasi Listrik bh
7 Payer Hidran bh
8 MCB 16A bh
9 Apar 5 kg Alat Pemadam Api Ringan - Fire Extinguisher + Kedudukannya bh
10 Kable Bcc 50 mm m1
11 Coper Rod Btg
12 Cincin Ring Bh
13 Moer Baut Tembaga Bh
14 Klem Tembaga Bh
15 Tembaga Seputzem Btg
16 Pipa Gip Panjang 1 m Diameter 1" Btg
17 Box Terminal Cable 200x100x60 cm Bh
18 Bak Kontrol 50 x 60 x 5 cm Bh
19 Serbuk Arang Kg
20 PintuBox Shaft Bh
1 Pekerja Hr
2 Mandor Hr
3 Tukang Listrik Hr
4 Tukang Kayu Hr
5 Kep. Tk Kayu Hr
6 Tukang Batu Hr
7 Kep. Tk Batu Hr
8 Tukang Besi Hr
9 Kepala Tk Kayu Hr
10 Tukang Cat Hr
11 Kep. Tk. Cat Hr
12 Tukang Plitur Hr
13 Tukang Jalan Hr
14 Tukang Gali Hr
15 Tk. Masak Aspal Hr komponen upah
16 Tk. Leiding Hr gaji
17 Masinis Hr trnspor
18 Pembantu Masines Hr biaya umum
19 Penjaga Api Hr kesra
20 Penjaga Malam Hr
21 Sopir Hr
22 Pembantu Sopir Hr
23 Mekanik Hr
24 Pembantu Mekanik Hr
25 Operator Hr
26 Pembantu Operator Hr
DAFTAR HARGA SATUAN BAHAN
Kegiatan : Pendamping Administrasi Kegiatan ( DAK 2017 )
Pekerjaan : Jasa Konsultasi Perencanaan Kegiatan DAK Afirmasi ( 1 Paket )
1 Excavator Jam
2 Motor Grader jam
3 Vibro Roller jam
4 Water Tanker jam
5 Dump Truck Jam
6 Alat Bantu ls
ANALISA HARGA SATUAN PEKERJAAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
PEKERJAAN PERSIAPAN
2. BAHAN
- Banner Lembar 1.0000 0.00
- Kayu Balok 5 / 7 cm Klas III M3 0.0385 0.00
- Paku Biasa 5 - 7 cm Kg 0.2000 0.00
3. ALAT
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
JUMLAH TOTAL
Pekerjaan Bekisting
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
Sloof Tangga
UKURAN JUMLAH
NO ITEM P DIA DIA BANYAK
KOMULATIF
(M) (Φ) (Φ) BESI
JUMLAH TOTAL
Pekerjaan Bekisting
UKURAN JUMLAH
NO ITEM P L LUAS BANYAK
KOMULATIF
(M) (M) (M2) BIDANG
JUMLAH TOTAL
UKURAN JUMLAH
NO ITEM P L T LUAS
KOMULATIF
(M) (M) (M) (M2)
JUMLAH TOTAL -
VOLUME KETERANGAN
(KG)
137.60
149.07
82.07
368.74
VOLUME KETERANGAN
(M2)
11.40
11.40
VOLUME KETERANGAN
(M3)
1.37
0.72
2.09
VOLUME KETERANGAN
(KG)
10.65
5.66
16.31
VOLUME KETERANGAN
(M2)
1.80
1.80
VOLUME KETERANGAN
(M3)
0.18
0.18