OVERALL PROGRES PENGERUKAN

Kontrak Luasan
No. Area Dredging
(M2)

1 Area Dredging - 1 118,723.47 M2

2 Area Dredging - 2 146,276.53 M2

Jumlah 265,000.00 M2

PROGRES PENGERUKAN

Kontrak Luasan
No. Area Dredging
(M2)

1 Area Dredging - 1 118,723.47 M2

2 Area Dredging - 2 146,276.53 M2

Jumlah 265,000.00 M2

PROGRES PENGERUKAN

Kontrak Luasan
No. Area Dredging
(M2)

1 Area Dredging - 1 118,723.47 M2

2 Area Dredging - 2 146,276.53 M2

Jumlah 265,000.00 M2

PROGRES PENGERUKAN
Kontrak Luasan
No. Area Dredging
(M2)

1 Area Dredging - 1 118,723.47 M2

2 Area Dredging - 2 146,276.53 M2

Jumlah 265,000.00 M2

PROGRES PENGERUKAN (ALTERNATIF BILA S-1 D

Kontrak Luasan
No. Area Dredging
(M2)

1 Area Dredging - 1 118,723.47 M2

2 Area Dredging - 2 146,276.53 M2

Jumlah 265,000.00 M2

PROGRES PENGERUKAN (ALTERNATIF BILA S-1 D

Kontrak Luasan
No. Area Dredging
(M2)

1 Area Dredging - 1 118,723.47 M2

2 Area Dredging - 2 146,276.53 M2

Jumlah 265,000.00 M2

121081.28
267,357.81
ERALL PROGRES PENGERUKAN

Progres Realisasi
s/d Tagihan ke - 4 Minggu ke - 76 Komulatif
2 2
(M ) % (M ) % (M2) %

77,803.23 53.19% 35,587.44 24.33% 113,390.67 77.52%

77,803.23 29.36% 35,587.44 13.43% 113,390.67 42.79%

PROGRES PENGERUKAN

Progres Realisasi
s/d Minggu Ke - 76 Minggu ke - 77 Komulatif
2 2
(M ) % (M ) % (M2) %

113,390.67 77.52% 4,808.64 3.29% 118,199.32 80.81%

113,390.67 42.79% 4,808.64 1.81% 118,199.32 44.60%

PROGRES PENGERUKAN

Progres Realisasi
s/d Minggu Ke - 77 Minggu ke - 78 Komulatif
2 2
(M ) % (M ) % (M2) %

118,199.32 80.81% 2,512.04 1.72% 120,711.35 82.52%

118,199.32 44.60% 2,512.04 0.95% 120,711.35 45.55%

PROGRES PENGERUKAN
Progres Realisasi
s/d Minggu Ke - 78 Minggu ke - 79 Komulatif
2 2
(M ) % (M ) % (M2) %

120,711.35 82.52% 2,416.53 1.65% 123,127.89 84.17%

120,711.35 45.55% 2,416.53 0.91% 123,127.89 46.46%

NGERUKAN (ALTERNATIF BILA S-1 DILEWATI)

Progres Realisasi
s/d Minggu Ke - 78 Minggu ke - 79 Komulatif
(M2) % (M2) % (M2) %

120,711.35 82.52% 5,522.51 3.78% 126,233.87 86.30%

120,711.35 45.55% 5,522.51 2.08% 126,233.87 47.64%

NGERUKAN (ALTERNATIF BILA S-1 DILEWATI)

Progres Realisasi
s/d Minggu Ke - 79 Minggu ke - 80 Komulatif
(M2) % (M2) % (M2) %

123,127.89 84.17% 3,105.98 2.12% 126,233.87 86.30%

123,127.89 46.46% 3,105.98 1.17% 126,233.87 47.64%


AREA DREDGING 2

Sisa Keruk gbr. Rasio


3,684.506 160,950.525 Gambar
11,564.787 146,276.532 Kontrak
12,880.501 Sisa Keruk Kontrak
90.88%
28,129.794 25,565.177
AREA DREDGING 2

Sisa Keruk gbr. Rasio


3,417.565 160,950.525 Gambar
5,488.272 146,276.532 Kontrak
12,880.501 Sisa Keruk Kontrak
3,684.506 90.88%
23,148.646
25,470.844

AREA DREDGING 2

Sisa Keruk gbr. Rasio


5,488.272 160,950.525 Gambar
12,880.501 146,276.532 Kontrak
3,684.506 Sisa Keruk Kontrak
90.88%
20,042.663
22,053.279

AREA DREDGING 2

Sisa Keruk gbr. Rasio


5,488.272 160,950.525 Gambar
12,880.501 146,276.532 Kontrak
3,684.506 Sisa Keruk Kontrak
90.88%
20,042.663
22,053.279
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 77
Lokasi : Area Dredging 2
Target Kedalaman : -12.50 ICD
Jam Kerja : 24 Jam

Tanggal Rata - Rata


No. Uraian 17-Nov-18 18-Nov-18 19-Nov-18 20-Nov-18 21-Nov-18 22-Nov-18 23-Nov-18 Total dlm 1
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Minggu

A Track Pengerukan
1 Nama Track
2 Total Panjang Track
3 Mulai Pengerukan di STA.
4 Selesai Pengerukan di STA.
5 Panjang Hasil Pengerukan - - - - - - - - - - - - - -

B. Waktu Pelaksanaan
1 Durasi Waktu Maintenance (Jam) - -
2 Durasi Waktu Faktor Cuaca (Jam) - -
3 Durasi Waktu Pengerukan Efektif (Jam) - - - - - - - - - - - - - - - -

C. Kedalaman Pengerukan
1 Rata - Rata Level Eksisting (m)
2 Rata - Rata Level Dikeruk (m)
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) - -
2 Panjang Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - - - - - - - -
5 Luasan Area yg Dikeruk (< -12,50 ICD) (m2) - - - - - - - - - - - - - - - -
Luasan Area yg Dikeruk (Mencapai Target
6 -12,50 ICD) (m2) - -

7 Produktivitas Per Jam (m3 / jam) - - - - - - - - - - - - - - - -


REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 78
Lokasi : Area Dredging 2
Target Kedalaman : -12.50 ICD
Jam Kerja : 24 Jam

Tanggal Rata - Rata


No. Uraian 24-Nov-18 25-Nov-18 26-Nov-18 27-Nov-18 28-Nov-18 29-Nov-18 30-Nov-18 Total dlm 1
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Minggu

A Track Pengerukan
1 Nama Track
2 Total Panjang Track
3 Mulai Pengerukan di STA.
4 Selesai Pengerukan di STA.
5 Panjang Hasil Pengerukan - - - - - - - - - - - - - -

B. Waktu Pelaksanaan
1 Durasi Waktu Maintenance (Jam) - -
2 Durasi Waktu Faktor Cuaca (Jam) - -
3 Durasi Waktu Pengerukan Efektif (Jam) - - - - - - - - - - - - - - - -

C. Kedalaman Pengerukan
1 Rata - Rata Level Eksisting (m)
2 Rata - Rata Level Dikeruk (m)
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) - -
2 Panjang Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - - - - - - - -
5 Luasan Area yg Dikeruk (< -12,50 ICD) (m2) - - - - - - - - - - - - - - - -
Luasan Area yg Dikeruk (Mencapai Target
6 -12,50 ICD) (m2) - -

7 Produktivitas Per Jam (m3 / jam) - - - - - - - - - - - - - - - -


REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 79
Lokasi : Area Dredging 2
Target Kedalaman : -12.50 ICD
Jam Kerja : 24 Jam

Tanggal Rata - Rata


No. Uraian 01-Dec-18 02-Dec-18 03-Dec-18 04-Dec-18 05-Dec-18 06-Dec-18 07-Dec-18 Total dlm 1
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Minggu

A Track Pengerukan
1 Nama Track
2 Total Panjang Track
3 Mulai Pengerukan di STA.
4 Selesai Pengerukan di STA.
5 Panjang Hasil Pengerukan - - - - - - - - - - - - - -

B. Waktu Pelaksanaan
1 Durasi Waktu Maintenance (Jam) - -
2 Durasi Waktu Faktor Cuaca (Jam) - -
3 Durasi Waktu Pengerukan Efektif (Jam) - - - - - - - - - - - - - - - -

C. Kedalaman Pengerukan
1 Rata - Rata Level Eksisting (m)
2 Rata - Rata Level Dikeruk (m)
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) - -
2 Panjang Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - - - - - - - -
5 Luasan Area yg Dikeruk (< -12,50 ICD) (m2) - - - - - - - - - - - - - - - -
Luasan Area yg Dikeruk (Mencapai Target
6 -12,50 ICD) (m2) - -

7 Produktivitas Per Jam (m3 / jam) - - - - - - - - - - - - - - - -


REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 80
Lokasi : Area Dredging 2
Target Kedalaman : -12.50 ICD
Jam Kerja : 24 Jam

Tanggal Rata - Rata


No. Uraian 08-Dec-18 09-Dec-18 10-Dec-18 11-Dec-18 12-Dec-18 13-Dec-18 14-Dec-18 Total dlm 1
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Minggu

A Track Pengerukan
1 Nama Track
2 Total Panjang Track
3 Mulai Pengerukan di STA. 132.00
4 Selesai Pengerukan di STA. 134.00
5 Panjang Hasil Pengerukan - - - - - - - - - - 2.00 - - -

B. Waktu Pelaksanaan
1 Durasi Waktu Maintenance (Jam) - -
2 Durasi Waktu Faktor Cuaca (Jam) - -
3 Durasi Waktu Pengerukan Efektif (Jam) - - - - - - - - - - 0.50 - - - 0.50 0.07

C. Kedalaman Pengerukan
1 Rata - Rata Level Eksisting (m) - 3.00
2 Rata - Rata Level Dikeruk (m) - 3.50
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - - - 0.50 - - - 0.50 0.07

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 7.14
2 Panjang Area yg Dikeruk (m) - - - - - - - - - - 2.00 - - - 2.00 0.29
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - - - 0.50 - - - 0.50 0.07
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - - 50.00 - - - 50.00 7.14
5 Luasan Area yg Dikeruk (< -12,50 ICD) (m2) - - - - - - - - - - 100.00 - - - 100.00 14.29
Luasan Area yg Dikeruk (Mencapai Target
6 -12,50 ICD) (m2) - -

7 Produktivitas Per Jam (m3 / jam) - - - - - - - - - - 100.00 - - - 100.00 14.29


Realisasi Progres Pengerukan sd Minggu ke 80

Progres Realisasi
Kontrak Luasan s/d Minggu Ke - 79 Minggu Ke - 80 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 118,723.47 M2 50.00 11.39 0.01% 50.00 11.39 0.01%

2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 265,000.00 M2 126,233.87 47.635% 11.39 0.00% 126,245.26 47.640%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3
Luasan 121,470.39 M2
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2
Rasio Luas CCO Terhadap Kntrak Awal 97.74%

Target Produktivitas Per jam : 374.00 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 5,236.00 m3 / hari
Sisa Durasi : 19.00 hari
Volume Didapat : 99,484.00 m3
Luasan Didapat : 22,668.89 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini
Volume Material yg Didapat Minggu Ini (V) : 50.00 M3
Konversi Luasan yg Didapat (L) : 11.39 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 81
Lokasi : Area Dredging 1
Target Kedalaman : -13.50 ICD
Jam Kerja : 24 Jam

Tanggal
No. Uraian 15-Dec-18 16-Dec-18 17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 Total Rata-Rata
per Hari
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

A Track Pengerukan
1 Nama Track
2 Total Panjang Track
3 Mulai Pengerukan di STA. - 23.00 27.00 37.00 27.00 - 31.00 - - - - - 25.00
4 Selesai Pengerukan di STA. - 33.00 37.00 44.00 31.00 - 36.00 - - - - - 36.00
5 Panjang Hasil Pengerukan - 10.00 10.00 7.00 4.00 - 5.00 - - - - - - 11.00

B. Waktu Pelaksanaan
1 Durasi Waktu Maintenance (Jam) - -
2 Durasi Waktu Faktor Cuaca / Loss (Jam) - -
3 Durasi Waktu Pengerukan Efektif (Jam) - 2.42 5.50 4.08 1.75 - 2.58 - - - - - - 6.67 23.00 3.29

C. Kedalaman Pengerukan
1 Rata - Rata Level Eksisting (m) - - 3.00 - 3.00 - 3.00 - 3.00 - - 3.00 - - - - - - 3.20
2 Rata - Rata Level Dikeruk (m) - - 5.80 - 6.30 - 7.00 - 5.00 - - 6.20 - - - - - - 6.50
3 Rata - Rata Ketebalan yg Dikeruk (m) - 2.80 3.30 4.00 2.00 - 3.20 - - - - - - 3.30 18.60 2.66

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) - 50.00 50.00 50.00 50.00 - 50.00 - - - - - 50.00 300.00 42.86
2 Panjang Area yg Dikeruk (m) - 10.00 10.00 7.00 4.00 - 5.00 - - - - - - 11.00 47.00 6.71
3 Ketebalan Area yg Dikeruk (m) - 2.80 3.30 4.00 2.00 - 3.20 - - - - - - 3.30 18.60 2.66
4 Volume Material yg Dihasilkan (m3) - 1,400.00 1,650.00 1,400.00 400.00 - 800.00 - - - - - - 1,815.00 7,465.00 1,066.43
5 Luasan Area yg Dikeruk (< -12,50 ICD) (m2) - 500.00 500.00 350.00 200.00 - 250.00 - - - - - - 550.00 2,350.00 335.71
Luasan Area yg Dikeruk (Mencapai Target
6 -12,50 ICD) (m2) - -

7 Produktivitas Per Jam (m3 / jam) - 579.31 300.00 342.86 228.57 - 309.68 - - - - - - 272.25 2,032.67 290.38
Realisasi Progres Pengerukan sd Minggu ke 81

Progres Realisasi
Kontrak Luasan s/d Minggu Ke - 80 Minggu Ke - 81 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 118,723.47 M2 50.00 11.39 0.01% 7,465.00 1,701.01 1.43% 7,515.00 1,712.40 1.44%

2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 265,000.00 M2 126,245.26 47.64% 1,701.01 0.64% 127,946.27 48.28%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3
Luasan 121,470.39 M2
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2
Rasio Luas CCO Terhadap Kntrak Awal 97.74%

Target Produktivitas Per jam : 374.00 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 5,236.00 m3 / hari
Sisa Durasi : 19.00 hari
Volume Didapat : 99,484.00 m3
Luasan Didapat : 22,668.89 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini
Volume Material yg Didapat Minggu Ini (V) : 7,465.00 M3
Konversi Luasan yg Didapat (L) : 1,701.01 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 82
Lokasi : Area Dredging 2
Target Kedalaman : -12.50 ICD
Jam Kerja : 24 Jam

Tanggal Rata - Rata


No. Uraian 22-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 Total per Hari
dlm 1
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Minggu

A Track Pengerukan
1 Nama Track
2 Total Panjang Track
3 Mulai Pengerukan di STA. 36.00 25.00 40.00 42.00 46.00 55.00 15.00 19.00 28.00
4 Selesai Pengerukan di STA. 40.00 36.00 42.00 46.00 55.00 57.00 19.00 25.00 36.00
5 Panjang Hasil Pengerukan 4.00 11.00 2.00 - 4.00 9.00 2.00 - - - 4.00 6.00 8.00 -

B. Waktu Pelaksanaan
1 Durasi Waktu Maintenance Kapal (Jam) - -
2 Durasi Waktu Buka Tutup Alur (Jam) - -
3 Durasi Waktu Kendala Material Karang (Jam)
4 Durasi Waktu Maintenance Pipa Transf (Jam)
5 Durasi Waktu Pengerukan Efektif (Jam) 2.17 6.67 0.83 - 1.75 6.08 0.50 - - - 2.00 1.83 4.75 - 26.58 3.80

C. Kedalaman Pengerukan
1 Rata - Rata Level Eksisting (m) - 3.20 - 3.20 - 3.20 - 3.20 - 3.20 - 3.20 - 2.50 - 2.50 - 3.00
2 Rata - Rata Level Dikeruk (m) - 6.50 - 6.50 - 6.50 - 6.50 - 6.50 - 5.50 - 5.50 - 5.50 - 6.50
3 Rata - Rata Ketebalan yg Dikeruk (m) 3.30 3.30 3.30 - 3.30 3.30 2.30 - - - 3.00 3.00 3.50 - 28.30 4.04

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 450.00 64.29
2 Panjang Area yg Dikeruk (m) 4.00 11.00 2.00 - 4.00 9.00 2.00 - - - 4.00 6.00 8.00 - 50.00 7.14
3 Ketebalan Area yg Dikeruk (m) 3.30 3.30 3.30 - 3.30 3.30 2.30 - - - 3.00 3.00 3.50 - 28.30 4.04
4 Volume Material yg Dihasilkan (m3) 660.00 1,815.00 330.00 - 660.00 1,485.00 230.00 - - - 600.00 900.00 1,400.00 - 8,080.00 1,154.29
5 Luasan Area yg Dikeruk (< -12,50 ICD) (m2) 200.00 550.00 100.00 - 200.00 450.00 100.00 - - - 200.00 300.00 400.00 - 2,500.00 357.14
Luasan Area yg Dikeruk (Mencapai Target
6 -12,50 ICD) (m2) - -

7 Produktivitas Per Jam (m3 / jam) 304.62 272.25 396.00 - 377.14 244.11 460.00 - - - 300.00 490.91 294.74 - 3,139.76 448.54
Realisasi Progres Pengerukan sd Minggu ke 82

Progres Realisasi
Kontrak Luasan s/d Minggu Ke - 81 Minggu Ke - 82 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 118,723.47 M2 7,515.00 1,712.40 1.44% 8,080.00 1,841.15 1.55% 15,595.00 3,553.55 2.99%

2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 265,000.00 M2 127,946.27 48.28% 1,841.15 0.69% 129,787.42 48.98%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3
Luasan 121,470.39 M2
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2
Rasio Luas CCO Terhadap Kntrak Awal 97.74%

Target Produktivitas Per jam : 374.00 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 5,236.00 m3 / hari
Sisa Durasi : 19.00 hari
Volume Didapat : 99,484.00 m3
Luasan Didapat : 22,668.89 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini
Volume Material yg Didapat Minggu Ini (V) : 8,080.00 M3
Konversi Luasan yg Didapat (L) : 1,841.15 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 83
Lokasi : Area Dredging 2
Target Kedalaman : -12.50 ICD
Jam Kerja : 24 Jam

Tanggal Rata - Rata


No. Uraian 29-Dec-18 30-Dec-18 31-Dec-18 01-Jan-19 02-Jan-19 03-Jan-19 04-Jan-19 Total per Hari
dlm 1
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Minggu

A Track Pengerukan
1 Nama Track
2 Total Panjang Track
3 Mulai Pengerukan di STA. 36.00 42.00 131.00 125.00 42.00 48.00
4 Selesai Pengerukan di STA. 42.00 54.00 135.00 128.00 48.00 50.00
5 Panjang Hasil Pengerukan 6.00 12.00 - - 4.00 - - - - - 3.00 - 6.00 2.00

B. Waktu Pelaksanaan
1 Durasi Waktu Maintenance Kapal (Jam) - -
2 Durasi Waktu Buka Tutup Alur (Jam) - -
3 Durasi Waktu Kendala Material Karang (Jam)
4 Durasi Waktu Maintenance Pipa Transf (Jam)
5 Durasi Waktu Pengerukan Efektif (Jam) 3.50 6.58 - - 2.08 - - - - - 1.75 - 3.00 1.33 18.25 2.61

C. Kedalaman Pengerukan
1 Rata - Rata Level Eksisting (m) - 3.00 - 3.00 - 3.00 - 3.00 - 3.00 - 3.00
2 Rata - Rata Level Dikeruk (m) - 6.50 - 6.50 - 6.50 - 6.50 - 6.50 - 6.50
3 Rata - Rata Ketebalan yg Dikeruk (m) 3.50 3.50 - - 3.50 - - - - - 3.50 - 3.50 3.50 21.00 3.00

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 300.00 42.86
2 Panjang Area yg Dikeruk (m) 6.00 12.00 - - 4.00 - - - - - 3.00 - 6.00 2.00 33.00 4.71
3 Ketebalan Area yg Dikeruk (m) 3.50 3.50 - - 3.50 - - - - - 3.50 - 3.50 3.50 21.00 3.00
4 Volume Material yg Dihasilkan (m3) 1,050.00 2,100.00 - - 700.00 - - - - - 525.00 - 1,050.00 350.00 5,775.00 825.00
5 Luasan Area yg Dikeruk (< -12,50 ICD) (m2) 300.00 600.00 - - 200.00 - - - - - 150.00 - 300.00 100.00 1,650.00 235.71
Luasan Area yg Dikeruk (Mencapai Target
6 -12,50 ICD) (m2) - -

7 Produktivitas Per Jam (m3 / jam) 300.00 318.99 - - 336.00 - - - - - 300.00 - 350.00 262.50 1,867.49 266.78
Realisasi Progres Pengerukan sd Minggu ke 83

Progres Realisasi
Kontrak Luasan s/d Minggu Ke - 82 Minggu Ke - 83 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 118,723.47 M2 15,595.00 3,553.55 2.99% 5,775.00 1,315.92 1.11% 21,370.00 4,869.47 4.10%

2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 265,000.00 M2 129,787.42 48.98% 1,315.92 0.50% 131,103.34 49.47%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3
Luasan 121,470.39 M2
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2
Rasio Luas CCO Terhadap Kntrak Awal 97.74%

Target Produktivitas Per jam : 374.00 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 5,236.00 m3 / hari
Sisa Durasi : 19.00 hari
Volume Didapat : 99,484.00 m3
Luasan Didapat : 22,668.89 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini
Volume Material yg Didapat Minggu Ini (V) : 5,775.00 M3
Konversi Luasan yg Didapat (L) : 1,315.92 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 84
Lokasi : Area Dredging 1
Target Kedalaman : -12.50 ICD
Jam Kerja : 24 Jam

Tanggal Rata - Rata


05-Jan-19 06-Jan-19 07-Jan-19 08-Jan-19 09-Jan-19 10-Jan-19 11-Jan-19 per Hari
No. Uraian Total
dlm 1
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Minggu

A Track Pengerukan
1 Nama Track
2 Total Panjang Track 205.00 205.86
3 Mulai Pengerukan di STA. 50.00 50.00 55.00 90.00 45.00 52.00 54.00 60.00 60.00 63.00
4 Selesai Pengerukan di STA. 52.00 54.00 59.00 92.00 52.00 54.00 60.00 60.00 63.00 65.00
5 Panjang Hasil Pengerukan 2.00 4.00 4.00 - 2.00 7.00 2.00 6.00 - - 3.00 2.00 - -

B. Waktu Pelaksanaan
1 Durasi Waktu Maintenance Kapal (Jam) - -
2 Durasi Waktu Buka Tutup Alur (Jam) - -
3 Durasi Waktu Kendala Material Karang (Jam)
4 Durasi Waktu Maintenance Pipa Transf (Jam)
5 Durasi Waktu Pengerukan Efektif (Jam) 1.25 3.58 2.08 - 1.17 6.00 1.83 3.50 0.45 - 3.00 3.17 - - 26.03 3.72

C. Kedalaman Pengerukan
1 Rata - Rata Level Eksisting (m) - 3.00 - 2.50 - 2.50 - 3.50 - 3.50 - 3.50 - 2.50 - 3.00 - 3.00 - 3.00
2 Rata - Rata Level Dikeruk (m) - 6.00 - 5.00 - 5.00 - 6.50 - 7.00 - 6.00 - 6.50 - 6.70 - 7.00 - 7.50
3 Rata - Rata Ketebalan yg Dikeruk (m) 3.00 2.50 2.50 - 3.00 3.50 2.50 4.00 3.70 - 4.00 4.50 - - 33.20 4.74

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 600.00 85.71
2 Panjang Area yg Dikeruk (m) 2.00 4.00 4.00 - 2.00 7.00 2.00 6.00 - - 3.00 2.00 - - 32.00 4.57
3 Ketebalan Area yg Dikeruk (m) 3.00 2.50 2.50 - 3.00 3.50 2.50 4.00 3.70 - 4.00 4.50 - - 33.20 4.74
4 Volume Material yg Dihasilkan (m3) 300.00 500.00 500.00 - 300.00 1,225.00 250.00 1,200.00 - - 600.00 450.00 - - 5,325.00 760.71
5 Luasan Area yg Dikeruk (< -12,50 ICD) (m2) 100.00 200.00 200.00 - 100.00 350.00 100.00 300.00 - - 150.00 100.00 - - 1,600.00 228.57
Luasan Area yg Dikeruk (Mencapai Target
6 - -
-12,50 ICD) (m2)
7 Produktivitas Per Jam (m3 / jam) 240.00 139.53 240.00 - 257.14 204.17 136.36 342.86 - - 200.00 142.11 - - 1,902.17 271.74
Realisasi Progres Pengerukan sd Minggu ke 84

Progres Realisasi
Kontrak Luasan s/d Minggu Ke - 83 Minggu Ke - 84 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 118,723.47 M2 21,370.00 4,869.47 4.10% 5,325.00 1,213.38 1.02% 26,695.00 6,082.85 5.12%

2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 265,000.00 M2 131,103.34 49.47% 1,213.38 0.46% 132,316.72 49.93%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3
Luasan 121,470.39 M2
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2
Rasio Luas CCO Terhadap Kntrak Awal 97.74%

Target Produktivitas Per jam : 374.00 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 5,236.00 m3 / hari
Sisa Durasi : 19.00 hari
Volume Didapat : 99,484.00 m3
Luasan Didapat : 22,668.89 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini
Volume Material yg Didapat Minggu Ini (V) : 5,325.00 M3
Konversi Luasan yg Didapat (L) : 1,213.38 M2
A. Target Pengerukan Area Dredging 1

Volume Luasan
No. Target
(M3) (M2) Uraian
4.3885698 1 Termijn 6 99,484.00 22,668.89 Termijn 6
4.3885698 2 Termijn 7 105,300.00 23,994.15 Termijn 7
204,784.00

A. Target Pengerukan Area Dredging 1

No. Target Volume Luasan


4.3885698 1 Termijn 6 99,484.00 22,668.89
4.3885698 2 Termijn 7 105,300.00 23,994.15
Keterangan 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan
Produktivitas 300 m3/j , Jam Kerja 11 Jam 3,300 3,300 3,300 3,300 3,300 3,300
Produktivitas 300 m3/j , Jam Kerja 13 Jam
Komulatif 3,300 6,600 9,900 13,200 16,500 19,800
Pencapaian Progres
2-Jan 3-Jan 4-Jan 5-Jan 6-Jan 7-Jan 8-Jan 9-Jan 10-Jan 11-Jan 12-Jan
3,300 3,300 3,300 3,300 3,300 3,300 3,300 3,300 3,300 3,300 3,300

23,100 26,400 29,700 33,000 36,300 39,600 42,900 46,200 49,500 52,800 56,100
13-Jan 14-Jan 15-Jan 16-Jan 17-Jan 18-Jan 19-Jan 20-Jan 21-Jan 22-Jan
3,300 3,300 3,300 3,300 3,300 3,300 3,300 3,300 3,300 3,300

59,400 62,700 66,000 69,300 72,600 75,900 79,200 82,500 85,800 89,100
Target Harian (2018 / 2019)
23-Jan 24-Jan 25-Jan 26-Jan 27-Jan 28-Jan 29-Jan 30-Jan 31-Jan
3,300 3,300 3,300
3,900 3,900 3,900 3,900 3,900 3,900
92,400 95,700 99,000 102,900 106,800 110,700 114,600 118,500 122,400
1-Feb 2-Feb 3-Feb 4-Feb 5-Feb 6-Feb 7-Feb 8-Feb 9-Feb

3,900 3,900 3,900 3,900 3,900 3,900 3,900 3,900 3,900


126,300 130,200 134,100 138,000 141,900 145,800 149,700 153,600 157,500
10-Feb 11-Feb 12-Feb 13-Feb 14-Feb 15-Feb 16-Feb 17-Feb 18-Feb

3,900 3,900 3,900 3,900 3,900 3,900 3,900 3,900 3,900


161,400 165,300 169,200 173,100 177,000 180,900 184,800 188,700 192,600
19-Feb 20-Feb 21-Feb 22-Feb 23-Feb 24-Feb 25-Feb

3,900 3,900 3,900 3,900 3,900 3,900 3,900


196,500 200,400 204,300 208,200 212,100 216,000 219,900
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 85
Lokasi : Area Dredging 1
Target Kedalaman : -12.50 ICD
Jam Kerja : 24 Jam

Tanggal
Rata - Rata
12-Jan-19 13-Jan-19 14-Jan-19 15-Jan-19 16-Jan-19 17-Jan-19 18-Jan-19 per Hari
No. Uraian Total
dlm 1
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Minggu

A Track Pengerukan
1 Nama Track
2 Total Panjang Track
3 Mulai Pengerukan di STA. 118.00 102.00 102.00 110.00 118.00 218.00 223.00
4 Selesai Pengerukan di STA. 120.00 102.00 110.00 118.00 124.00 223.00 230.00
5 Panjang Hasil Pengerukan 2.00 - 8.00 8.00 6.00 5.00 7.00 - - - - - - -

B. Waktu Pelaksanaan
1 Durasi Waktu Maintenance Kapal (Jam) - -
2 Durasi Waktu Buka Tutup Alur (Jam) - -
3 Durasi Waktu Kendala Material Karang (Jam)
4 Durasi Waktu Maintenance Pipa Transf (Jam)
5 Durasi Waktu Pengerukan Efektif (Jam) 2.08 0.67 5.67 3.42 3.83 2.08 5.58 - - - - - - - 23.33 3.33

C. Kedalaman Pengerukan
1 Rata - Rata Level Eksisting (m) - 4.50 - 3.00 - 3.00 - 3.00 - 3.00 - 3.50 - 3.00
2 Rata - Rata Level Dikeruk (m) - 6.50 - 5.50 - 5.50 - 5.70 - 5.70 - 6.50 - 7.00
3 Rata - Rata Ketebalan yg Dikeruk (m) 2.00 2.50 2.50 2.70 2.70 3.00 4.00 - - - - - - - 19.40 2.77

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 350.00 50.00
2 Panjang Area yg Dikeruk (m) 2.00 - 8.00 8.00 6.00 5.00 7.00 - - - - - - - 36.00 5.14
3 Ketebalan Area yg Dikeruk (m) 2.00 2.50 2.50 2.70 2.70 3.00 4.00 - - - - - - - 19.40 2.77
4 Volume Material yg Dihasilkan (m3) 200.00 - 1,000.00 1,080.00 810.00 750.00 1,400.00 - - - - - - - 5,240.00 748.57
5 Luasan Area yg Dikeruk (< -12,50 ICD) (m2) 100.00 - 400.00 400.00 300.00 250.00 350.00 - - - - - - - 1,800.00 257.14
Luasan Area yg Dikeruk (Mencapai Target
6 - -
-12,50 ICD) (m2)
7 Produktivitas Per Jam (m3 / jam) 96.00 - 176.47 316.10 211.30 360.00 250.75 - - - - - - - 1,410.62 201.52
Realisasi Progres Pengerukan sd Minggu ke 85

Progres Realisasi
Kontrak Luasan s/d Minggu Ke - 84 Minggu Ke - 85 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 118,723.47 M2 26,695.00 6,082.85 5.12% 5,240.00 1,194.01 1.01% 31,935.00 7,276.86 6.13%

2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 265,000.00 M2 132,316.72 49.93% 1,194.01 0.45% 133,510.73 50.38%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3
Luasan 121,470.39 M2
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2
Rasio Luas CCO Terhadap Kntrak Awal 97.74%

Target Produktivitas Per jam : 374.00 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 5,236.00 m3 / hari
Sisa Durasi : 19.00 hari
Volume Didapat : 99,484.00 m3
Luasan Didapat : 22,668.89 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini
Volume Material yg Didapat Minggu Ini (V) : 5,240.00 M3
Konversi Luasan yg Didapat (L) : 1,194.01 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 86
Lokasi : Area Dredging 1
Target Kedalaman : -12.50 ICD
Jam Kerja : 24 Jam

Tanggal
Rata - Rata
19-Jan-19 20-Jan-19 21-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 25-Jan-19 per Hari
No. Uraian Total
dlm 1
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Minggu

A Track Pengerukan
1 Nama Track
2 Total Panjang Track
3 Mulai Pengerukan di STA. 125.00 128.00 162.00 114.00 165.00 177.00
4 Selesai Pengerukan di STA. 128.00 130.00 163.00 120.00 177.00 181.00
5 Panjang Hasil Pengerukan 3.00 2.00 1.00 6.00 12.00 4.00 - - - - - - -

B. Waktu Pelaksanaan
1 Durasi Waktu Maintenance Kapal (Jam) - -
2 Durasi Waktu Buka Tutup Alur (Jam) - -
3 Durasi Waktu Kendala Material Karang (Jam)
4 Durasi Waktu Maintenance Pipa Transf (Jam)
5 Durasi Waktu Pengerukan Efektif (Jam) 2.67 - 1.00 0.75 4.67 7.92 2.50 - - - - - - - 19.50 2.79

C. Kedalaman Pengerukan
1 Rata - Rata Level Eksisting (m) - 3.50 - 3.50 - 4.00 - 3.50 - 4.00 - 4.00
2 Rata - Rata Level Dikeruk (m) - 6.50 - 6.50 - 7.50 - 7.00 - 7.50 - 7.50
3 Rata - Rata Ketebalan yg Dikeruk (m) 3.00 3.00 3.50 3.50 3.50 3.50 - - - - - - - 20.00 2.86

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 300.00 42.86
2 Panjang Area yg Dikeruk (m) 3.00 2.00 1.00 6.00 12.00 4.00 - - - - - - - 28.00 4.00
3 Ketebalan Area yg Dikeruk (m) 3.00 3.00 3.50 3.50 3.50 3.50 - - - - - - - 20.00 2.86
4 Volume Material yg Dihasilkan (m3) 450.00 - 300.00 175.00 1,050.00 2,100.00 700.00 - - - - - - - 4,775.00 682.14
5 Luasan Area yg Dikeruk (< -12,50 ICD) (m2) 150.00 - 100.00 50.00 300.00 600.00 200.00 - - - - - - - 1,400.00 200.00
Luasan Area yg Dikeruk (Mencapai Target
6 - -
-12,50 ICD) (m2)
7 Produktivitas Per Jam (m3 / jam) 168.75 - 300.00 233.33 225.00 265.26 280.00 - - - - - - - 1,472.35 210.34
Realisasi Progres Pengerukan sd Minggu ke 85

Progres Realisasi
Kontrak Luasan s/d Minggu Ke - 84 Minggu Ke - 85 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2)

1 Area Dredging - 1 118,723.47 M2 31,935.00 7,276.86 6.13% 4,775.00 1,088.05 0.92% 36,710.00 8,364.91

2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87

Jumlah 265,000.00 M2 133,510.73 50.38% 1,088.05 0.41% 134,598.78


267746.922.00 1175408.987.58

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3
Luasan 121,470.39 M2
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2
Rasio Luas CCO Terhadap Kntrak Awal 97.74%

Target Produktivitas Per jam : 374.00 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 5,236.00 m3 / hari
Sisa Durasi : 19.00 hari
Volume Didapat : 99,484.00 m3
Luasan Didapat : 22,668.89 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini
Volume Material yg Didapat Minggu Ini (V) : 4,775.00 M3
Konversi Luasan yg Didapat (L) : 1,088.05 M2
gres Pengerukan sd Minggu ke 85

Progres Realisasi
Komulatif
%

7.05%

86.30%

50.79%
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 87
Lokasi : Area Dredging 1
Target Kedalaman : -12.50 ICD
Jam Kerja : 24 Jam

Tanggal
26-Jan-19 27-Jan-19 28-Jan-19 29-Jan-19 30-Jan-19 31-Jan-19 01-Feb-19
No. Uraian Total
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

A Track Pengerukan
1 Nama Track
2 Total Panjang Track 369.64 369.64 369.64 369.64 369.64 369.64 369.64 369.64 369.64 369.64
3 Mulai Pengerukan di STA. 216.00 220.00 232.00 233.00 237.00 240.00 248.00 256.00 264.00 270.00 275.00
4 Selesai Pengerukan di STA. 220.00 232.00 233.00 237.00 240.00 248.00 256.00 264.00 270.00 275.00 280.00
5 Panjang Hasil Pengerukan - - 4.00 12.00 1.00 4.00 3.00 8.00 8.00 8.00 6.00 5.00 - 5.00

B. Waktu Pelaksanaan
1 Durasi Waktu Maintenance Kapal (Jam) -
2 Durasi Waktu Buka Tutup Alur (Jam) -
3 Durasi Waktu Kendala Material Karang (Jam)
4 Durasi Waktu Maintenance Pipa Transf (Jam)
5 Durasi Waktu Pengerukan Efektif (Jam) - - 2.42 10.00 0.67 10.33 2.58 8.67 6.08 8.25 7.83 6.67 - 7.50 71.00

C. Kedalaman Pengerukan
1 Rata - Rata Level Eksisting (m) - 3.00 - 3.50 - 3.50 - 3.50 - 3.50 - 3.50 - 3.50 - 3.50 - 3.50 - 3.50 - 3.50
2 Rata - Rata Level Dikeruk (m) - 6.50 - 7.50 - 7.50 - 8.00 - 8.00 - 8.00 - 8.00 - 8.00 - 8.50 - 8.00 - 8.00
3 Rata - Rata Ketebalan yg Dikeruk (m) - - 3.50 4.00 4.00 4.50 4.50 4.50 4.50 4.50 5.00 4.50 - 4.50 48.00

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 550.00
2 Panjang Area yg Dikeruk (m) - - 4.00 12.00 1.00 4.00 3.00 8.00 8.00 8.00 6.00 5.00 - 5.00 64.00
3 Ketebalan Area yg Dikeruk (m) - - 3.50 4.00 4.00 4.50 4.50 4.50 4.50 4.50 5.00 4.50 - 4.50 48.00
4 Volume Material yg Dihasilkan (m3) - - 700.00 2,400.00 200.00 900.00 675.00 1,800.00 1,800.00 1,800.00 1,500.00 1,125.00 - 1,125.00 14,025.00
5 Luasan Area yg Dikeruk (< -12,50 ICD) (m2) - - 200.00 600.00 50.00 200.00 150.00 400.00 400.00 400.00 300.00 250.00 - 250.00 3,200.00
Luasan Area yg Dikeruk (Mencapai Target
6 -
-12,50 ICD) (m2)
7 Produktivitas Per Jam (m3 / jam) - - 289.66 240.00 300.00 87.10 261.29 207.69 295.89 218.18 191.49 168.75 - 150.00 2,410.05
SI LOG BOOK HARIAN - KK MULIA 07

Rata - Rata
per Hari
dlm 1
Minggu

-
-

10.14

6.86

78.57
9.14
6.86
2,003.57
457.14

344.29
Realisasi Progres Pengerukan sd Minggu ke 87

Progres Realisasi
Kontrak Luasan s/d Minggu Ke - 86 Minggu Ke - 87 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2)

1 Area Dredging - 1 118,723.47 M2 36,710.00 8,364.91 7.05% 14,025.00 3,195.80 2.69% 50,735.00 11,560.71

2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87

Jumlah 265,000.00 M2 134,598.78 50.79% 3,195.80 1.21% 137,794.58

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3
Luasan 121,470.39 M2
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2
Rasio Luas CCO Terhadap Kntrak Awal 97.74%

Target Produktivitas Per jam : 374.00 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari 48,749.00
Target Produksi Harian Rata-Rata (PHR) : 5,236.00 m3 / hari
Sisa Durasi : 19.00 hari
Volume Didapat : 99,484.00 m3
Luasan Didapat : 22,668.89 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini
Volume Material yg Didapat Minggu Ini (V) : 14,025.00 M3
Konversi Luasan yg Didapat (L) : 3,195.80 M2
Progres Pengerukan sd Minggu ke 87

Progres Realisasi
Komulatif
%

9.74%

86.30%

52.00%
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 88
Lokasi : Area Dredging 1
Target Kedalaman : -13.55 ICD
Jam Kerja : 24 Jam

Tanggal
Rata - Rata
02-Feb-19 03-Feb-19 04-Feb-19 05-Feb-19 06-Feb-19 07-Feb-19 08-Feb-19 per Hari
No. Uraian Total
dlm 1
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Minggu

A Track Pengerukan
1 Nama Track
2 Total Panjang Track 369.64 369.64 369.64 369.64 369.64 369.64 369.64 369.64 369.64 369.64 369.64 369.64 369.64 369.64
3 Mulai Pengerukan di STA. 280.00 286.00 228.00 233.00 239.00 243.00 249.00 255.00 262.00 262.00 267.00 223.00 229.00 239.00
4 Selesai Pengerukan di STA. 286.00 295.00 233.00 239.00 243.00 249.00 255.00 262.00 269.00 268.00 273.00 229.00 239.00 250.00
5 Panjang Hasil Pengerukan 6.00 9.00 5.00 6.00 4.00 6.00 6.00 7.00 7.00 6.00 6.00 6.00 10.00 11.00

B. Waktu Pelaksanaan
1 Durasi Waktu Maintenance Kapal (Jam) - -
2 Durasi Waktu Buka Tutup Alur (Jam) - -
3 Durasi Waktu Kendala Material Karang (Jam)
4 Durasi Waktu Maintenance Pipa Transf (Jam)
5 Durasi Waktu Pengerukan Efektif (Jam) 7.00 9.92 5.83 8.58 5.33 9.75 7.92 9.00 7.17 8.75 6.42 6.08 4.25 7.58 103.58 14.80

C. Kedalaman Pengerukan
1 Rata - Rata Level Eksisting (m) - 3.50 - 3.50 - 3.50 - 3.50 - 4.50 - 4.20 - 4.00 - 5.25 - 5.75 - 5.25 - 5.25 - 6.80 - 8.00 - 8.00
2 Rata - Rata Level Dikeruk (m) - 8.00 - 8.00 - 8.00 - 8.00 - 9.00 - 9.00 - 9.00 - 10.00 - 10.00 - 10.50 - 10.50 - 10.00 - 10.00 - 10.00
3 Rata - Rata Ketebalan yg Dikeruk (m) 4.50 4.50 4.50 4.50 4.50 4.80 5.00 4.75 4.25 5.25 5.25 3.20 2.00 2.00 59.00 8.43

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 700.00 100.00
2 Panjang Area yg Dikeruk (m) 6.00 9.00 5.00 6.00 4.00 6.00 6.00 7.00 7.00 6.00 6.00 6.00 10.00 11.00 95.00 13.57
3 Ketebalan Area yg Dikeruk (m) 4.50 4.50 4.50 4.50 4.50 4.80 5.00 4.75 4.25 5.25 5.25 3.20 2.00 2.00 59.00 8.43
4 Volume Material yg Dihasilkan (m3) 1,350.00 2,025.00 1,125.00 1,350.00 900.00 1,440.00 1,500.00 1,662.50 1,487.50 1,575.00 1,575.00 960.00 1,000.00 1,100.00 19,050.00 2,721.43
5 Luasan Area yg Dikeruk (< -12,50 ICD) (m2) 300.00 450.00 250.00 300.00 200.00 300.00 300.00 350.00 350.00 300.00 300.00 300.00 500.00 550.00 4,750.00 678.57
Luasan Area yg Dikeruk (Mencapai Target
6 - -
-12,50 ICD) (m2)
7 Produktivitas Per Jam (m3 / jam) 192.86 204.20 192.86 157.28 168.75 147.69 189.47 184.72 207.56 180.00 245.45 157.81 235.29 145.05 2,609.01 372.72
Realisasi Progres Pengerukan sd Minggu ke 87

Progres Realisasi
Kontrak Luasan s/d Minggu Ke - 87 Minggu Ke - 88 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 118,723.47 M2 50,735.00 11,560.71 9.74% 19,050.00 4,340.82 3.66% 69,785.00 15,901.54 13.39%

2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 265,000.00 M2 137,794.58 52.00% 4,340.82 1.64% 142,135.40 53.64%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3
Luasan 121,470.39 M2
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2
Rasio Luas CCO Terhadap Kntrak Awal 97.74%

Target Produktivitas Per jam : 374.00 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 5,236.00 m3 / hari
Sisa Durasi : 19.00 hari
Volume Didapat : 99,484.00 m3
Luasan Didapat : 22,668.89 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini
Volume Material yg Didapat Minggu Ini (V) : 19,050.00 M3
Konversi Luasan yg Didapat (L) : 4,340.82 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 89
Lokasi : Area Dredging 1
Target Kedalaman : -13.55 ICD 83.333
Total Kubikasi : 533,081.28 m3
Total Luas : 121,470.39 m2
Total kubikasi tahap pertama : 99,000.00 m3
Konversi Luasan : 22,558.60 m2
Jam Kerja : 24 Jam

Tanggal
Rata - Rata
09-Feb-19 10-Feb-19 11-Feb-19 12-Feb-19 13-Feb-19 14-Feb-19 15-Feb-19 per Hari
No. Uraian Total Target
dlm 1
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Minggu

A Track Pengerukan
1 Nama Track D-4 D-4 D-4 D-4 D-4 D-4 D-4 D-4 D-4 D-4 D-4 D-4 D-4 D-4 D-4
2 Total Panjang Track 369.64 369.64 369.64 369.64 369.64 369.64 369.64 369.64 369.64 369.64 369.64 369.64 369.64 369.64 369.64
3 Mulai Pengerukan di STA. 216.00 224.00 226.00 233.00 241.00 250.00 259.00 267.00 274.00 281.00 288.00 298.00 308.00 312.00 216.00
4 Selesai Pengerukan di STA. 224.00 226.00 233.00 241.00 250.00 259.00 267.00 274.00 281.00 288.00 298.00 308.00 312.00 312.00 312.00
5 Panjang Hasil Pengerukan 8.00 2.00 7.00 8.00 9.00 9.00 8.00 7.00 7.00 7.00 10.00 10.00 4.00 - 96.00 13.71

B. Waktu Pelaksanaan
1 Durasi Waktu Maintenance Kapal (Jam) - -
2 Durasi Waktu Buka Tutup Alur (Jam) - -
3 Durasi Waktu Kendala Material Karang (Jam) - -
4 Durasi Waktu Maintenance Pipa Transf (Jam) - -
5 Durasi Waktu Pengerukan Efektif (Jam) 6 50 1 20 4 35 7 30 6 10 8 0 6 10 5 40 5 15 7 55 7 30 7 45 3 5 72.00 345.00
4,665.00 77.00
6.83 1.33 4.58 7.50 6.17 8.00 6.17 5.67 5.25 7.92 7.50 7.75 3.08 0.00 77.75 45.00 11.11 12.00
C. Kedalaman Pengerukan 93%
1 Rata - Rata Level Eksisting (m) - 4.00 - 4.00 - 4.00 - 4.00 - 5.00 - 5.00 - 5.00 - 5.00 - 4.80 - 4.80 - 4.70 - 4.70 - 4.50
2 Rata - Rata Level Dikeruk (m) - 7.50 - 7.50 - 7.50 - 7.50 - 8.00 - 8.00 - 8.00 - 8.00 - 8.00 - 8.00 - 7.50 - 7.50 - 7.50
3 Rata - Rata Ketebalan yg Dikeruk (m) 3.50 3.50 3.50 3.50 3.00 3.00 3.00 3.00 3.20 3.20 2.80 2.80 3.00 - 41.00 5.86

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00
2 Panjang Area yg Dikeruk (m) 8.00 2.00 7.00 8.00 9.00 9.00 8.00 7.00 7.00 7.00 10.00 10.00 4.00 - 96.00 13.71
3 Ketebalan Area yg Dikeruk (m) 3.50 3.50 3.50 3.50 3.00 3.00 3.00 3.00 3.20 3.20 2.80 2.80 3.00 - 41.00 5.86
4 Volume Material yg Dihasilkan (m3) 1,400.00 350.00 1,225.00 1,400.00 1,350.00 1,350.00 1,200.00 1,050.00 1,120.00 1,120.00 1,400.00 1,400.00 600.00 - 14,965.00 2,137.86 3,000.00
71%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 400.00 100.00 350.00 400.00 450.00 450.00 400.00 350.00 350.00 350.00 500.00 500.00 200.00 - 4,800.00 685.71
Konversi Luasan (Mencapai Target
6 319.01 79.75 279.13 319.01 307.62 307.62 273.44 239.26 255.21 255.21 319.01 319.01 136.72 - 3,409.99 487.14
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m3 / jam) 204.88 262.50 267.27 186.67 218.92 168.75 194.59 185.29 213.33 141.47 186.67 180.65 194.59 #DIV/0! 192.48 300.00
64%

Luasan (99.000m3) 31.50


1862 55350
0.319 ###
1.52
Realisasi Progres Pengerukan sd Minggu ke 89

Progres Realisasi
Kontrak Luasan s/d Minggu Ke - 88 Minggu Ke - 89 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 118,723.47 M2 69,785.00 15,901.54 13.39% 14,965.00 3,409.99 2.87% 84,750.00 19,311.53 16.27%

2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 265,000.00 M2 142,135.40 53.64% 3,409.99 1.29% 145,545.40 54.92%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3
Luasan 121,470.39 M2
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 18.64
Rasio Luas CCO Terhadap Kntrak Awal 97.74%

Target Produktivitas Per jam : 374.00 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 5,236.00 m3 / hari
Sisa Durasi : 19.00 hari
Volume Didapat : 99,484.00 m3 sisa target 14,734.00
Luasan Didapat : 22,668.89 m2

B. Realisasi Minggu Ini 14,734.00 sisa hari sebelumnya


Realisasi Pengerukan Minggu Ini 600.00
Volume Material yg Didapat Minggu Ini (V) : 14,965.00 M3
Konversi Luasan yg Didapat (L) : 3,409.99 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 90
Lokasi : Area Dredging 1
Target Kedalaman : -13.55 ICD 83.333
Total Kubikasi : 533,081.28 m3
Total Luas : 121,470.39 m2
Total kubikasi tahap pertama : 99,000.00 m3
Konversi Luasan : 22,558.60 m2
Jam Kerja : 24 Jam

Tanggal
16-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 20-Feb-19 21-Feb-19
No. Uraian
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

A Track Pengerukan
1 Nama Track D-4 D-4 D-4 D-4 D-4 D-4 D-4 D-4 D-4 D-4 D-4 D-4
2 Total Panjang Track 369.64 369.64 369.64 369.64 369.64 369.64 369.64 369.64 369.64 369.64 369.64 369.64
3 Mulai Pengerukan di STA. 312.00 312.00 312.00 312.00 227.00 229.00 239.00 245.00 209.00 218.00 220.00 228.00
4 Selesai Pengerukan di STA. 312.00 312.00 312.00 312.00 229.00 239.00 245.00 255.00 218.00 220.00 228.00 236.00
5 Panjang Hasil Pengerukan - - - 2.00 10.00 6.00 10.00 9.00 2.00 8.00 8.00

B. Waktu Pelaksanaan
1 Durasi Waktu Maintenance Kapal (Jam)
2 Durasi Waktu Buka Tutup Alur (Jam)
3 Durasi Waktu Kendala Material Karang (Jam)
4 Durasi Waktu Maintenance Pipa Transf (Jam)
5 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 2 45 8 50 6 35 9 50 6 15 0 55 5 35 8

0.00 0.00 0.00 0.00 2.75 8.83 6.58 9.83 6.25 0.92 5.58 8.33
C. Kedalaman Pengerukan
1 Rata - Rata Level Eksisting (m) - - - - - 8.00 - 8.00 - 8.00 - 8.00 - 4.00 - 4.00 - 4.50 - 5.00
2 Rata - Rata Level Dikeruk (m) - - - - - 9.50 - 10.00 - 10.00 - 10.50 - 7.50 - 7.50 - 8.10 - 8.10
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - 1.50 2.00 2.00 2.50 3.50 3.50 3.60 3.10

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00
2 Panjang Area yg Dikeruk (m) - - - - 2.00 10.00 6.00 10.00 9.00 2.00 8.00 8.00
3 Ketebalan Area yg Dikeruk (m) - - - - 1.50 2.00 2.00 2.50 3.50 3.50 3.60 3.10
4 Volume Material yg Dihasilkan (m3) - - - - 150.00 1,000.00 600.00 1,250.00 1,575.00 350.00 1,440.00 1,240.00

5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - 100.00 500.00 300.00 500.00 450.00 100.00 400.00 400.00
Konversi Luasan (Mencapai Target
6 - - - - 34.18 227.86 136.72 284.83 358.89 79.75 328.13 282.55
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m3 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! 54.55 113.21 91.14 127.12 252.00 381.82 257.91 148.80

Luasan (99.000m3)
1862 55350
0.319 ###
1.52
OOK HARIAN - KK MULIA 07

Tanggal
Rata - Rata
21-Feb-19 22-Feb-19 per Hari
Total Target
dlm 1
Malam Siang Malam Minggu

D-4 D-4 D-4 D-4


369.64 369.64 369.64 369.64
228.00 236.00 236.00 312.00
236.00 236.00 242.00 242.00
8.00 - 6.00 61.00 15.25

- -
- -
- -
- -
20 1 0 6 25 51.00 330.00
3,390.00 56.00
8.33 1.00 6.42 56.50 30.00 14.13 12.00
118%
- 5.00 - 5.00 - 5.00
- 8.10 - 8.10 - 8.10
3.10 3.10 3.10 27.90 6.98

50.00 50.00 50.00 50.00 50.00


8.00 - 6.00 61.00 8.71
3.10 3.10 3.10 27.90 3.99
1,240.00 - 930.00 8,535.00 2,133.75 3,000.00
71%
400.00 - 300.00 3,050.00 435.71

282.55 - 211.91 1,944.82 277.83

148.80 - 144.94 151.06 300.00


50%
Realisasi Progres Pengerukan sd Minggu ke 90

Progres Realisasi
Kontrak Luasan s/d Minggu Ke - 89 Minggu Ke - 90 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 118,723.47 M2 84,750.00 19,311.53 16.27% 8,535.00 1,944.82 1.64% 93,285.00 21,256.36 17.90%

2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 265,000.00 M2 145,545.40 54.92% 1,944.82 0.73% 147,490.22 55.66%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3
Luasan 121,470.39 M2
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 18.64
Rasio Luas CCO Terhadap Kntrak Awal 97.74%
64,484.00
Target Produktivitas Per jam : 374.00 m3 / jam
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 5,236.00 m3 / hari
Sisa Durasi : 19.00 hari
Volume Didapat : 99,484.00 m3 sisa target 6,199.00
Luasan Didapat : 22,668.89 m2

B. Realisasi Minggu Ini 6,199.00 sisa hari sebelumnya


Realisasi Pengerukan Minggu Ini
Volume Material yg Didapat Minggu Ini (V) : 8,535.00 M3
Konversi Luasan yg Didapat (L) : 1,944.82 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 91
Lokasi : Area Dredging B
Target Kedalaman : -13.55 ICD 83.333
Total Kubikasi : 533,081.28 m3
Total Luas : 121,470.39 m2
Total kubikasi tahap pertama : 99,000.00 m3
Konversi Luasan : 22,558.60 m2
Jam Kerja : 24 Jam

Tanggal
Rata - Rata
23-Feb-19 24-Feb-19 25-Feb-19 26-Feb-19 27-Feb-19 28-Feb-19 01-Mar-19 per Hari
No. Uraian Total Target
POSISI S.D 22-FEB-19 dlm 1
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Minggu

A Track Pengerukan
1 Nama Track D-4 D-4 D-4 D-4 D-4 D-4 D-4 D-4 D-4 A 1.1 A 1.1 A 1.1 A 1.1 A 1.1 A 1.1 A 1.1
2 Total Panjang Track 369.64 369.64 369.64 369.64 369.64 369.64 369.64 369.64 369.64 180.00 180.00 180.00 180.00 180.00 180.00 180.00
3 Mulai Pengerukan di STA. 0 242.00 246.00 250.00 255.00 227.00 234.00 274.00 280.00 0 23.00 23.00 54.00 89.00 101.00 242.00
4 Selesai Pengerukan di STA. 242.00 246.00 250.00 255.00 261.00 234.00 240.00 280.00 286.00 23.00 23.00 54.00 89.00 101.00 150.00 150.00
5 Panjang Hasil Pengerukan 4.00 4.00 5.00 6.00 7.00 6.00 6.00 6.00 23.00 - 31.00 35.00 12.00 49.00 194.00 27.71

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 3 50 3 50 6 15 7 40 7 40 8 55 6 50 7 40 1 55 6 50 8 50 2 0 8 20 72.00 515.00
2 Durasi Efektif 3.83 3.83 6.25 7.67 7.67 8.92 6.83 7.67 1.92 0 6.83 8.83 2.00 8.33 80.58 1.00
11.51 12.00
C. Kedalaman Pengerukan 96%
1 Rata - Rata Level Eksisting (m) - 5.00 - 5.00 - 5.00 - 5.00 - 4.80 - 4.60 - 5.00 - 5.00 13.55 - 13.55 13.55 13.55 13.55
2 Rata - Rata Level Dikeruk (m) - 8.50 - 8.50 - 8.50 - 8.50 - 8.50 - 8.50 - 9.00 - 9.00 13.55 - 13.55 13.55 13.55 13.55
3 Rata - Rata Ketebalan yg Dikeruk (m) 3.50 3.50 3.50 3.50 3.70 3.90 4.00 4.00 - - - - - - 29.60 4.23

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00 42.00 42.00 42.00 13.55 13.55
2 Panjang Area yg Dikeruk (m) 4.00 4.00 5.00 6.00 7.00 6.00 6.00 6.00 23.00 - 31.00 35.00 12.00 49.00 194.00 27.71
3 Ketebalan Area yg Dikeruk (m) 3.50 3.50 3.50 3.50 3.70 3.90 4.00 4.00 - - - - - - 29.60 4.23
4 Volume Material yg Dihasilkan (m3) 93,285.00 700.00 700.00 875.00 1,050.00 1,295.00 1,170.00 1,200.00 1,200.00 - - - - - - 8,190.00 1,170.00 3,000.00
101,475.00 39%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 21256.36 200.00 200.00 250.00 300.00 350.00 300.00 300.00 300.00 966.00 0 1,302.00 1,470.00 504.00 2,058.00 8,500.00 1,214.29

6 Konversi Luasan (Mencapai Target 159.51 159.51 199.38 239.26 295.08 266.60 273.44 273.44 - - - - - - 1,866.21 266.60
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m3 / jam) 182.61 182.61 140.00 136.96 168.91 131.21 175.61 156.52 504.00 - 190.54 166.42 252.00 246.96 101.633919338159 300.00
34%

Luasan (99.000m3)
1862 LUASAN 6,300.00
0.319 KUBIKASI -
Realisasi Progres Pengerukan sd Minggu ke 91

Progres Realisasi
Kontrak Luasan s/d Minggu Ke - 90 Minggu Ke - 91 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 118,723.47 M2 93,285.00 21,256.36 17.90% 8,190.00 1,866.21 1.57% 101,475.00 23,122.57 19.48%

2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 265,000.00 M2 147,490.22 55.66% 1,866.21 0.70% 149,356.44 56.36%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3
Luasan 121,470.39 M2
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2
Rasio Luas CCO Terhadap Kntrak Awal 97.74%

Target Produktivitas Per jam : 374.00 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 5,236.00 m3 / hari
Sisa Durasi : 19.00 hari
Volume Didapat : 99,484.00 m3
Luasan Didapat : 22,668.89 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini
Volume Material yg Didapat Minggu Ini (V) : 8,190.00 M3
Konversi Luasan yg Didapat (L) : 1,866.21 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 92 Target per hari


Lokasi : Area Dredging 1A jam efektif : 14 jam
Target Kedalaman : -13.55 ICD luasan : 1597.81 m2
Total Kubikasi : 50,347.10 m3 kubikasi : 2517.3551 m3
Total Luas : 31,956.11 m2 penyelesaian : 20 hari
total panjang track : 369.57 m2 panjang : 39.95 m
lebar : 40 m

Tanggal
Rata - Rata
02-Mar-19 03-Mar-19 04-Mar-19 05-Mar-19 06-Mar-19 07-Mar-19 08-Mar-19 per Hari
No. Uraian Total dlm 1 Target
KOMULATIF
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Minggu

A Track Pengerukan
1 Nama Track A A2.1 A2.1 A2.1 A2.1 A2.1 A2.1 A2.1 A2.1 A2.1 A2.1 A2.1 A2.1 A2.1 A2.1 A2.1
2 Total Panjang Track 180.00 180.00 180.00 180.00 180.00 180.00 180.00 180.00 180.00 180.00 180.00 180.00 180.00 180.00 180.00
3 Mulai Pengerukan di STA. 0 44.00 48.00 48.00 48.00 48.00 48.00 48.00 48.00 48.00 48.00 48.00 48.00 48.00 #REF!
4 Selesai Pengerukan di STA. 44.00 48.00 48.00 48.00 48.00 48.00 48.00 48.00 48.00 48.00 48.00 48.00 48.00 48.00 48.00
5 Panjang Hasil Pengerukan 44.00 4.00 - - - - - - - - - - - - 48.00 12.00

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 5 30 0 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5.00 60.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 5.50 0.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 - 6.00 12.00

C. Kedalaman Pengerukan 50%


1 Rata - Rata Level Eksisting (m) 13.55 13.55 - - - - - - - - - - - -
2 Rata - Rata Level Dikeruk (m) 13.55 13.55 - - - - - - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 42.00 42.00 - - - - - - - - - - - - - -
2 Panjang Area yg Dikeruk (m) 44.00 4.00 - - - - - - - - - - - - 48.00 12.00
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - - - - - - - - 3,000.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 1,848.00 168.00 - - - - - - - - - - - - 2,016.00 504.00

6 Konversi Luasan (Mencapai Target - - - - - - - - - - - - - - - -


-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 336.00 336.00 - - - - - - - - - - - - - 300.00
0%

LUASAN 2,016.00
KUBIKASI -
Realisasi Progres Pengerukan Area A sd Minggu ke 1

Progres Realisasi
Kontrak Luasan Minggu Ke - 0 Minggu Ke - 1 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 31,956.11 M2 - - 0.00% - 2,016.00 6.31% - 25,138.57 20.70%

2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 178,232.64 M2 126,233.87 70.83% 2,016.00 1.13% 151,372.44 56.54%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3
Luasan 121,470.39 M2
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2
Rasio Luas CCO Terhadap Kntrak Awal 26.31%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari
Sisa Durasi : 20.00 hari
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini
Volume Material yg Didapat Minggu Ini (V) : - M3
Konversi Luasan yg Didapat (L) : 2,016.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 93 Target per hari


Lokasi : Area Dredging 1A jam efektif : 14 jam
Target Kedalaman : -13.55 ICD luasan : 1597.81 m2
Total Kubikasi : 50,347.10 m3 kubikasi : 2517.3551 m3
Total Luas : 31,956.11 m2 penyelesaian : 20 hari
total panjang track : 369.57 m2 panjang : 39.95 m
lebar : 40 m

Tanggal
Rata - Rata
09-Mar-19 10-Mar-19 11-Mar-19 12-Mar-19 13-Mar-19 14-Mar-19 15-Mar-19 per Hari
No. Uraian Total Target
KOMULATIF dlm 1
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Minggu

A Track Pengerukan
1 Nama Track A2.1 A2.1 A2.1 A2.1 A2.1 A2.1 A2.1 A2.1 A2.1 A2.1 A2.1 A2.1 A2.1 A2.1 A2.1 A2.1
3 Mulai Pengerukan di STA. 48.00 48.00 48.00 42.00 50.00 80.00 115.00 115.00 123.00 135.00 142.00 149.00 156.00 164.00 166.00 48.00
4 Selesai Pengerukan di STA. 48.00 48.00 48.00 50.00 80.00 115.00 155.00 123.00 135.00 142.00 149.00 156.00 164.00 166.00 166.00 135.00
5 Panjang Hasil Pengerukan - - - 8.00 30.00 35.00 40.00 8.00 12.00 7.00 7.00 7.00 8.00 2.00 - 164.00 41.00

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 2 25 10 25 7 0 9 10 6 55 8 15 9 15 9 5 6 15 8 20 2 10 0 0 76.00 195.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 2.42 10.42 7.00 9.17 6.92 8.25 9.25 9.08 6.25 8.33 2.17 0.00 79.25 1.00 13.21 12.00

C. Kedalaman Pengerukan 110%


1 Rata - Rata Level Eksisting (m) - - - 13.00 - 13.00 - 11.00 - 11.00 - 9.65 - 9.65 - 8.30 - 8.30 - 9.00 - 9.00 - 9.00 -
2 Rata - Rata Level Dikeruk (m) - - - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - 0.55 0.55 2.55 2.55 3.90 3.90 5.25 5.25 4.55 4.55 4.55 - 38.15 9.54

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) - - 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - 8.00 30.00 35.00 40.00 8.00 12.00 7.00 7.00 7.00 8.00 2.00 - 164.00 41.00
3 Ketebalan Area yg Dikeruk (m) - - 0.55 0.55 2.55 2.55 3.90 3.90 5.25 5.25 4.55 4.55 4.55 - 38.15 5.45
4 Volume Material yg Dihasilkan (m3) - - 184.80 693.00 3,748.50 4,284.00 1,310.40 1,965.60 1,543.50 1,543.50 1,337.70 1,528.80 382.20 - 18,522.00 2,646.00 3,000.00
88%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - 336.00 1,260.00 1,470.00 1,680.00 336.00 504.00 294.00 294.00 294.00 336.00 84.00 - 6,888.00 2,296.00

6 Konversi Luasan (Mencapai Target - - - - - - - - - - - - - - - -


-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) - - 139.03 120.96 210.00 183.27 48.58 61.09 31.78 32.37 47.04 40.32 38.77 #DIV/0! 233.72 300.00
78%

*dinamo pompa air pendingin


*Menunggu perbaikan dinamo macet

LUASAN 6,888.00
KUBIKASI 18,522.00
Realisasi Progres Pengerukan Area A sd Minggu ke 2

Progres Realisasi
Kontrak Luasan Minggu Ke - 1 Minggu Ke - 2 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - A 31,956.11 M2 - 25,138.57 78.67% 18,522.00 6,888.00 21.55% 18,522.00 32,026.57 100.22%

2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 178,232.64 M2 151,372.44 84.93% 6,888.00 3.86% 158,260.44 59.11%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3
Luasan 121,470.39 M2
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2
Rasio Luas CCO Terhadap Kntrak Awal 26.31%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari
Sisa Durasi : 20.00 hari
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini
Volume Material yg Didapat Minggu Ini (V) : 18,522.00 M3
Konversi Luasan yg Didapat (L) : 6,888.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 94 Target per hari


Lokasi : Area Dredging 1A jam efektif : 14 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 50,347.10 m3 kubikasi : 2619.5 m3
Total Luas : 31,956.11 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : 60.00 m
lebar : 50 m

Tanggal
16-Mar-19 17-Mar-19 18-Mar-19 19-Mar-19 20-Mar-19 21-Mar-19 22-Mar-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

A Track Pengerukan
1 Nama Track A2.1 A2.1 A2.1 A2.1 A2.1 A2.1 A2.2 A2.2 A2.1 A2.1 A2.2 A2.2 A2.2 A2.2
3 Mulai Pengerukan di STA. 48.00 166.00 170.00 178.00 183.00 193.00 193.00 193.00 197.00 205.00 136.00 143.00 151.00 159.00 161.00
4 Selesai Pengerukan di STA. 166.00 170.00 178.00 183.00 193.00 193.00 193.00 197.00 205.00 136.00 143.00 151.00 159.00 161.00 166.00
5 Panjang Hasil Pengerukan - 4.00 8.00 5.00 10.00 - - 4.00 8.00 8.00 7.00 8.00 8.00 2.00 5.00 77.00 15.40

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 3 25 8 0 5 55 10 0 0 0 0 0 3 10 9 45 7 50 9 5 6 40 8 0 2 55 4 35 74.00 320.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 3.42 8.00 5.92 10.00 0.00 0.00 3.17 9.75 7.83 9.08 6.67 8.00 2.92 4.58 79.33 1.00 13.22 12.00
1.00 1.00 0.00 1.00 1.00 1.00 1.00 6.00

C. Kedalaman Pengerukan 110%


1 Rata - Rata Level Eksisting (m) - 9.00 - 8.60 - 8.50 - 8.40 - - - 8.58 - 8.70 - 8.80 - 8.80 - 8.80 - 8.80 - 9.80 - 9.80
2 Rata - Rata Level Dikeruk (m) - 13.55 - 13.55 - 13.55 - 13.55 - - - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 - 13.55
3 Rata - Rata Ketebalan yg Dikeruk (m) 4.55 4.95 5.05 5.15 - - 4.97 4.85 4.75 4.75 4.75 4.75 3.75 3.75 56.02 14.01

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 42.00 42.00 42.00 42.00 - - 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 4.00 8.00 5.00 10.00 - - 4.00 8.00 8.00 7.00 8.00 8.00 2.00 5.00 77.00 11.00
3 Ketebalan Area yg Dikeruk (m) 4.55 4.95 5.05 5.15 - - 4.97 4.85 4.75 4.75 4.75 4.75 3.75 3.75 56.02 8.00
4 Volume Material yg Dihasilkan (m3) 764.40 1,663.20 1,060.50 2,163.00 - - 834.96 1,629.60 1,596.00 1,396.50 1,596.00 1,596.00 315.00 787.50 15,402.66 2,200.38 3,000.00
73%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 168.00 336.00 210.00 420.00 - - 168.00 336.00 336.00 294.00 336.00 336.00 84.00 210.00 3,234.00 462.00
Konversi Luasan (Mencapai Target
6 - - - - - - - - - - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 49.17 42.00 35.49 42.00 - - 53.05 34.46 42.89 32.37 50.40 42.00 28.80 45.82 194.15 300.00
produktivitas Per Jam kalender (m3 / jam) 0.33 0.35 0.36 0.35 0.34 0.34 0.34 0.34 0.27 0.27 65%

*menunggu bunker

LUASAN 3,234.00
KUBIKASI 15,402.66
Realisasi Progres Pengerukan Area A sd Minggu ke 3

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 2 Minggu Ke - 3 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 18,522.00 32,026.57 26.37% 15,402.66 3,234.00 2.66% 33,924.66 35,260.57 29.03%
KUMULATIF TERHADAP KONTRAK 34,463.19 29.03%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 158,260.44 59.11% 3,234.00 1.21% 161,494.44 60.32%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3
Luasan 121,470.39 M2
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari
Sisa Durasi : 20.00 hari
Luasan yang
Volume Didapat : 50,347.10 m3 suda dikeruk 18,438.00
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini Sisa luasan 13,518.11
pengerukan
Volume Material yg Didapat Minggu Ini (V) : 15,402.66 M3 sisa kubikasi 16,422.44 3,223.50 m3/jam
hari ini
pengerukan
Konversi Luasan yg Didapat (L) : 3,234.00 M2 eff 15.92 jam 202.52 m3/jam
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 95 Target per hari


Lokasi : Area Dredging 1A jam efektif : 14 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 50,347.10 m3 kubikasi : 2619.5 m3
Total Luas : 31,956.11 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : 60.00 m
lebar : 42 m

Tanggal
23-Mar-19 24-Mar-19 25-Mar-19 26-Mar-19 27-Mar-19 28-Mar-19 29-Mar-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

A Track Pengerukan
1 Nama Track - - - - - - A2.2 A2.2 A2.2 A2.1 A2.2 A2.2 A2.2 A2.2
3 Mulai Pengerukan di STA. 166.00 166.00 169.00 173.00 178.00 183.00 189.00 194.00 199.00 203.00 209.00 212.00 212.00 212.00
4 Selesai Pengerukan di STA. 166.00 169.00 173.00 178.00 183.00 189.00 194.00 199.00 203.00 209.00 212.00 212.00 212.00 217.00
5 Panjang Hasil Pengerukan - 3.00 4.00 5.00 5.00 6.00 5.00 5.00 4.00 6.00 3.00 - - 5.00 51.00 51.00

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 1 0 2 50 3 50 7 30 6 20 8 15 6 35 6 50 5 20 9 15 5 25 0 0 0 55 9 30 67.00 395.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 1.00 2.83 3.83 7.50 6.33 8.25 6.58 6.83 5.33 9.25 5.42 0.00 0.92 9.50 73.58 1.00 10.51 12.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 7.00

C. Kedalaman Pengerukan 88%


1 Rata - Rata Level Eksisting (m) - - 9.80 - 9.40 - 9.40 - 8.60 - 8.60 - 8.60 - 8.60 - 8.60 - 8.60 - 8.60 - - 9.65 - 9.65
2 Rata - Rata Level Dikeruk (m) - - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 - - 13.55 - 13.55
3 Rata - Rata Ketebalan yg Dikeruk (m) - 3.75 4.15 4.15 4.95 4.95 4.95 4.95 4.95 4.95 4.95 - 3.90 3.90 54.50 13.63

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 - 42.00 42.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - 3.00 4.00 5.00 5.00 6.00 5.00 5.00 4.00 6.00 3.00 - - 5.00 51.00 7.29
3 Ketebalan Area yg Dikeruk (m) - 3.75 4.15 4.15 4.95 4.95 4.95 4.95 4.95 4.95 4.95 - 3.90 3.90 54.50 7.79
4 Volume Material yg Dihasilkan (m3) - 472.50 697.20 871.50 1,039.50 1,247.40 1,039.50 1,039.50 831.60 1,247.40 623.70 - - 819.00 9,928.80 1,418.40 3,000.00
47%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - 126.00 168.00 210.00 210.00 252.00 210.00 210.00 168.00 252.00 126.00 - - 210.00 2,142.00 306.00
Konversi Luasan (Mencapai Target
6 - - - - - - - - - - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) - 44.47 43.83 28.00 33.16 30.55 31.90 30.73 31.50 27.24 23.26 #DIV/0! - 22.11 134.93 300.00
produktivitas Per Jam kalender (m3 / jam) - 0.27 0.30 0.30 0.35 0.35 0.35 0.35 0.35 0.35 0.35 - 0.28 0.28 45%

*selang air
*menunggu bunker
radiator macet

LUASAN 2,142.00
KUBIKASI 9,928.80
Realisasi Progres Pengerukan Area A sd Minggu ke 4

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 3 Minggu Ke - 4 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 8,595.20 36,620.57 30.15% 9,928.80 2,142.00 1.76% 18,524.00 38,762.57 31.91%
KUMULATIF TERHADAP KONTRAK 37,886.00 31.91%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 162,854.44 60.82% 2,142.00 0.80% 164,996.44 61.62%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 luas 99000 23,122.57
Luasan 121,470.39 M2 luas area a 13,498.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 yang suda 15,640.00
Rasio Luas CCO Terhadap Kntrak Awal 100.00% dikeruk

Target Produktivitas Per jam : 179.81 m3 / jam 9109.8


Rencana Jam Kerja : 14.00 jam / hari 15,430.00 17,705.00
sisa
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari pengerukan 16,526.11 32,642.10
sebelum 29
Sisa Durasi : 20.00 hari
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini Sisa luasan 16,316.11
pengerukan
Volume Material yg Didapat Minggu Ini (V) : 9,928.80 M3 sisa kubikasi 31,823.10 hari ini 3,223.50 m3/jam

pengerukan
Konversi Luasan yg Didapat (L) : 2,142.00 M2 eff 15.92 jam 202.52 m3/jam
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 96 Target per hari


Lokasi : 1A jam efektif : 14 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 50,347.10 m3 kubikasi : 2619.5 m3
Total Luas : 31,956.11 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : 60.00 m
lebar : 42 m

Tanggal
30-Mar-19 31-Mar-19 01-Apr-19 02-Apr-19 03-Apr-19 04-Apr-19 05-Apr-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

A Track Pengerukan
1 Nama Track A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2
3 Mulai Pengerukan di STA. 166.00 217.00 220.00 220.00 220.00 222.00 226.00 230.00 236.00 241.00 241.00 241.00 246.00 251.00 255.00
4 Selesai Pengerukan di STA. 217.00 220.00 220.00 220.00 222.00 226.00 230.00 236.00 241.00 241.00 241.00 246.00 251.00 255.00 260.00
5 Panjang Hasil Pengerukan 3.00 - - 2.00 4.00 4.00 6.00 5.00 - - 5.00 5.00 4.00 5.00 43.00 43.00

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 5 20 2 0 0 0 3 0 9 0 9 20 8 20 5 40 0 30 0 15 7 30 9 5 4 25 6 50 67.00 255.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 5.33 2.00 0.00 3.00 9.00 9.33 8.33 5.67 0.50 0.25 7.50 9.08 4.42 6.83 71.25 1.00 11.88 12.00
1.00 0.00 1.00 1.00 1.00 1.00 1.00 6.00

C. Kedalaman Pengerukan 99%


1 Rata - Rata Level Eksisting (m) - 8.40 - 8.00 - - 8.55 - 8.55 - 8.55 - 8.55 - 8.55 - - - 8.15 - 8.15 - 8.20 - 8.15
2 Rata - Rata Level Dikeruk (m) - 13.55 - 13.55 - - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 - - - 13.55 - 13.55 - 13.55 - 13.55
3 Rata - Rata Ketebalan yg Dikeruk (m) 5.15 5.55 - 5.00 5.00 5.00 5.00 5.00 - - 5.40 5.40 5.35 5.40 57.25 14.31

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 42.00 42.00 - 42.00 42.00 42.00 42.00 42.00 - - 42.00 42.00 42.00 42.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 3.00 - - 2.00 4.00 4.00 6.00 5.00 - - 5.00 5.00 4.00 5.00 43.00 6.14
3 Ketebalan Area yg Dikeruk (m) 5.15 5.55 - 5.00 5.00 5.00 5.00 5.00 - - 5.40 5.40 5.35 5.40 57.25 8.18
4 Volume Material yg Dihasilkan (m3) 648.90 - - 420.00 840.00 840.00 1,260.00 1,050.00 - - 1,134.00 1,134.00 898.80 1,134.00 9,359.70 1,337.10 3,000.00
45%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 126.00 - - 84.00 168.00 168.00 252.00 210.00 - - 210.00 210.00 168.00 210.00 1,806.00 258.00
Konversi Luasan (Mencapai Target
6 - - - - - - - - - - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 23.63 - #DIV/0! 28.00 18.67 18.00 30.24 37.06 - - 28.00 23.12 38.04 30.73 131.36 300.00
produktivitas Per Jam kalender (m3 / jam) 0.37 0.40 - 0.36 0.36 0.36 0.36 0.36 - - 0.39 0.39 0.38 0.39 44%

*pompa air pendingan mesin induk


648.90 7.33 88.49
trouble

LUASAN 1,806.00
KUBIKASI 9,359.70
Realisasi Progres Pengerukan Area A sd Minggu ke 4

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 4 Minggu Ke - 5 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 18,524.00 38,762.57 31.91% 9,359.70 1,806.00 1.49% 27,883.70 40,568.57 33.40%
KUMULATIF TERHADAP KONTRAK 39,651.16 33.40%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 164,996.44 61.62% 1,806.00 0.67% 166,802.44 62.30%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 luas 99000 23,122.57
Luasan 121,470.39 M2 luas area a 15,640.00 awal
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 yang suda 17,446.00
Rasio Luas CCO Terhadap Kntrak Awal 100.00% dikeruk

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari
Sisa Durasi : 20.00 hari
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini Sisa luasan 14,510.11
pengerukan
Volume Material yg Didapat Minggu Ini (V) : 9,359.70 M3 sisa kubikasi 22,463.40 420.00 m3/jam
hari ini
pengerukan
Konversi Luasan yg Didapat (L) : 1,806.00 M2 eff 3.00 jam 140.00 m3/jam
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 97 Target per hari


Lokasi : 1A jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 50,347.10 m3 kubikasi : 2000 m3
Total Luas : 31,956.11 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : 60.00 m
lebar : 50 m

Tanggal
06-Apr-19 07-Apr-19 08-Apr-19 09-Apr-19 10-Apr-19 11-Apr-19 12-Apr-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

A Track Pengerukan
1 Nama Track A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2
3 Mulai Pengerukan di STA. 217.00 260.00 261.00 267.00 268.00 274.00 278.00 282.00 285.00 290.00 294.00 299.00 302.00 307.00 307.00
4 Selesai Pengerukan di STA. 260.00 261.00 267.00 268.00 274.00 278.00 282.00 285.00 290.00 294.00 299.00 302.00 307.00 307.00 309.00
5 Panjang Hasil Pengerukan 1.00 6.00 1.00 6.00 4.00 4.00 3.00 5.00 4.00 5.00 3.00 5.00 - 2.00 49.00 49.00

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 1 40 9 30 1 20 11 5 6 20 6 55 8 5 7 20 7 5 9 15 6 20 9 35 0 0 4 20 84.00 290.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 1.67 9.50 1.33 11.08 6.33 6.92 8.08 7.33 7.08 9.25 6.33 9.58 0.00 4.33 88.83 1.00 14.81 12.00
1.00 1.00 1.00 1.00 1.00 1.00 0.00 6.00

C. Kedalaman Pengerukan 123%


1 Rata - Rata Level Eksisting (m) - 8.10 - 8.10 - 8.15 - 8.10 - 8.15 - 8.10 - 8.10 - 8.10 - 8.10 - 8.10 - 8.10 - 8.10 - - 8.10
2 Rata - Rata Level Dikeruk (m) - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 - - 13.55
3 Rata - Rata Ketebalan yg Dikeruk (m) 5.45 5.45 5.40 5.45 5.40 5.45 5.45 5.45 5.45 5.45 5.45 5.45 - 5.45 70.75 17.69

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 - 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 1.00 6.00 1.00 6.00 4.00 4.00 3.00 5.00 4.00 5.00 3.00 5.00 - 2.00 49.00 7.00
3 Ketebalan Area yg Dikeruk (m) 5.45 5.45 5.40 5.45 5.40 5.45 5.45 5.45 5.45 5.45 5.45 5.45 - 5.45 70.75 10.11
4 Volume Material yg Dihasilkan (m3) 228.90 1,373.40 226.80 1,373.40 907.20 915.60 686.70 1,144.50 915.60 1,144.50 686.70 1,144.50 - 545.00 11,292.80 1,613.26 3,000.00
54%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 42.00 252.00 42.00 252.00 168.00 168.00 126.00 210.00 168.00 210.00 126.00 210.00 - 100.00 2,074.00 296.29
Konversi Luasan (Mencapai Target
6 - - - - - - - - - - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 25.20 26.53 31.50 22.74 26.53 24.29 15.59 28.64 23.72 22.70 19.89 21.91 #DIV/0! 23.08 127.12 300.00
produktivitas Per Jam kalender (m3 / jam) 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 - 0.39 42%

545.00 4.33 125.77

LUASAN 2,074.00
KUBIKASI 11,292.80
Realisasi Progres Pengerukan Area A sd Minggu ke 97

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 96 Minggu Ke - 97 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 27,883.70 40,568.57 33.40% 11,292.80 2,074.00 1.71% 39,176.50 42,642.57 35.11%
KUMULATIF TERHADAP KONTRAK 41,678.25 35.11%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 166,802.44 62.30% 2,074.00 0.77% 168,876.44 63.07%

20,042.66
A. Target Pengerukan Termijn 6
Volume 533,081.28 M3 luas 99000 23,122.57
Luasan 121,470.39 M2 luas area a 17,446.00 awal
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 yang suda 19,520.00
Rasio Luas CCO Terhadap Kntrak Awal 100.00% dikeruk

Target Produktivitas Per jam : 179.81 m3 / jam 22,668.89 50347.1 158,189.98 59.74%
Rencana Jam Kerja : 14.00 jam / hari 24418 41.45% 59.08%
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 1,749.11 874.56 159,064.54 59.41%
Sisa Durasi : 20.00 hari 159,939.09 0.33%
Volume Didapat : 50,347.10 m3 25,550.00
Luasan Didapat : 31,956.11 m2 8,516.67 168,455.76 62.92%
176,972.42 66.10%
B. Realisasi Minggu Ini 185,489.09 69.28%
Realisasi Pengerukan Minggu Ini Sisa luasan 12,436.11
pengerukan
Volume Material yg Didapat Minggu Ini (V) : 11,292.80 M3 sisa kubikasi 11,170.60 hari ini 420.00 m3/jam

pengerukan
Konversi Luasan yg Didapat (L) : 2,074.00 M2 eff 3.00 jam 140.00 m3/jam
Realisasi Progres Pengerukan Area A sd Minggu ke 4

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 4 Minggu Ke - 5 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 27,883.70 40,568.57 33.40% 11,292.80 2,074.00 1.71% 39,176.50 42,642.57 35.11%
KUMULATIF TERHADAP KONTRAK 41,678.25 35.11%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 166,802.44 62.30% 2,074.00 0.77% 168,876.44 63.07%

20,042.66
A. Target Pengerukan Termijn 6
Volume 533,081.28 M3 luas 99000 23,122.57
Luasan 121,470.39 M2 luas area a 17,446.00 awal
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 yang suda 19,520.00
Rasio Luas CCO Terhadap Kntrak Awal 100.00% dikeruk

Target Produktivitas Per jam : 179.81 m3 / jam 22,668.89 50347.1 158,189.98 59.74%
Rencana Jam Kerja : 14.00 jam / hari 24418 41.45% 59.08%
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 1,749.11 874.56 159,064.54 59.41%
Sisa Durasi : 20.00 hari 159,939.09 0.33%
Volume Didapat : 50,347.10 m3 25,550.00
Luasan Didapat : 31,956.11 m2 8,516.67 168,455.76 62.92%
176,972.42 66.10%
B. Realisasi Minggu Ini 185,489.09 69.28%
Realisasi Pengerukan Minggu Ini Sisa luasan 12,436.11
pengerukan
Volume Material yg Didapat Minggu Ini (V) : 11,292.80 M3 sisa kubikasi 11,170.60 420.00 m3/jam
hari ini
pengerukan
Konversi Luasan yg Didapat (L) : 2,074.00 M2 eff 3.00 jam 140.00 m3/jam
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 98 Target per hari


Lokasi : 1A jam efektif : 10 jam 5108
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2 2.554
Total Kubikasi : 50,347.10 m3 kubikasi : 2000 m3
Total Luas : 31,956.11 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
13-Apr-19 14-Apr-19 15-Apr-19 16-Apr-19 17-Apr-19 18-Apr-19 19-Apr-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

A Track Pengerukan
1 Nama Track A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2
3 Mulai Pengerukan di STA. 260.00 309.00 313.00 232.00 236.00 240.00 243.50 247.00 249.00 253.50 253.50 253.50 256.50 261.00 262.50
4 Selesai Pengerukan di STA. 309.00 313.00 313.00 236.00 240.00 243.50 247.00 249.00 253.50 253.50 253.50 256.50 261.00 262.50 267.00
5 Panjang Hasil Pengerukan 4.00 - 4.00 4.00 3.50 3.50 2.00 4.50 - - 3.00 4.50 1.50 4.50 39.00 39.00

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 8 5 0 0 9 30 10 5 8 50 9 35 4 35 11 0 0 0 0 0 6 50 9 50 3 5 9 5 86.00 270.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 8.08 0.00 9.50 10.08 8.83 9.58 4.58 11.00 0.00 0.00 6.83 9.83 3.08 9.08 90.50 1.00 15.08 12.00
1.00 1.00 1.00 1.00 0.00 1.00 1.00 6.00

C. Kedalaman Pengerukan 126%


1 Rata - Rata Level Eksisting (m) - 7.80 - - 7.80 - 7.75 - 7.75 - 7.65 - 7.70 - 7.70 - - - 7.70 - 7.70 - 7.70 - 7.70
2 Rata - Rata Level Dikeruk (m) - 13.55 - - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 - - - 13.55 - 13.55 - 13.55 - 13.55
3 Rata - Rata Ketebalan yg Dikeruk (m) 5.75 - 5.75 5.80 5.80 5.90 5.85 5.85 - - 5.85 5.85 5.85 5.85 64.10 16.03

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 - 50.00 50.00 50.00 50.00 50.00 50.00 - - 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 4.00 - 4.00 4.00 3.50 3.50 2.00 4.50 - - 3.00 4.50 1.50 4.50 39.00 5.57
3 Ketebalan Area yg Dikeruk (m) 5.75 - 5.75 5.80 5.80 5.90 5.85 5.85 - - 5.85 5.85 5.85 5.85 64.10 9.16
4 Volume Material yg Dihasilkan (m3) 1,150.00 - 1,150.00 1,160.00 1,015.00 1,032.50 585.00 1,316.25 - - 877.50 1,316.25 438.75 1,316.25 11,357.50 1,622.50 3,000.00
54%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 200.00 - 200.00 200.00 175.00 175.00 100.00 225.00 - - 150.00 225.00 75.00 225.00 1,950.00 278.57

6 Konversi Luasan (Mencapai Target - - - - - - - - - - - - - - - -


-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 24.74 #DIV/0! 21.05 19.83 19.81 18.26 21.82 20.45 #DIV/0! #DIV/0! 21.95 22.88 24.32 24.77 125.50 300.00
produktivitas Per Jam kalender (m3 / jam) 142.27 - 0.41 0.41 0.41 0.42 0.42 0.42 - - 0.42 0.42 0.42 0.42 42%

1,755.00 12.17 144.25

LUASAN 1,950.00
KUBIKASI 11,357.50
Realisasi Progres Pengerukan Area A sd Minggu ke 98

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 97 Minggu Ke - 98 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 18,056.00 42,912.57 35.33% 11,357.50 1,950.00 1.61% 29,413.50 44,862.57 36.93%
KUMULATIF TERHADAP KONTRAK 43,848.05 36.93%
2
2 Area Dredging - 2 146,276.53 M 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 169,146.44 63.17% 1,950.00 0.73% 171,096.44 63.90%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 luas 99000 23,122.57
Luasan 121,470.39 M2 19,790.00 awal
luas a sampai
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 tgl 12 april 21,740.00 akhir
Rasio Luas CCO Terhadap Kntrak Awal 100.00%
volume a
sampai tgl 12 18056
april
Target Produktivitas Per jam : 179.81 m3 / jam
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari
Sisa Durasi : 20.00 hari
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini Sisa luasan 10,216.11

Volume Material yg Didapat Minggu Ini (V) : 11,357.50 M3 sisa kubikasi 20,933.60 pengerukan 420.00 m3/jam
hari ini
pengerukan
Konversi Luasan yg Didapat (L) : 1,950.00 M2 3.00 jam 140.00 m3/jam
eff
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 99 Target per hari


Lokasi : 1A jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 50,347.10 m3 kubikasi : 2000 m3
Total Luas : 31,956.11 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
20-Apr-19 21-Apr-19 22-Apr-19 23-Apr-19 24-Apr-19 25-Apr-19 26-Apr-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

A Track Pengerukan
1 Nama Track A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2
3 Mulai Pengerukan di STA. 240.00 267.00 267.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00
4 Selesai Pengerukan di STA. 267.00 267.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00
5 Panjang Hasil Pengerukan - 6.00 - - - - - - - - - - - - 6.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 1 35 11 0 1 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 13.00 65.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 1.58 11.00 1.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.08 - 7.04 12.00
1.00 1.00 0.00 0.00 0.00 0.00 0.00 2.00

C. Kedalaman Pengerukan 59%


1 Rata - Rata Level Eksisting (m) - 7.70 - 7.70 - 7.70 - - - - - - - - - - -
2 Rata - Rata Level Dikeruk (m) - 13.55 - 13.55 - 13.55 - - - - - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) 5.85 5.85 5.85 - - - - - - - - - - - 17.55 4.39

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 - - - - - - - - - - - 42.00 42.00
2 Panjang Area yg Dikeruk (m) - 6.00 - - - - - - - - - - - - 6.00 0.86
3 Ketebalan Area yg Dikeruk (m) 5.85 5.85 5.85 - - - - - - - - - - - 17.55 2.51
4 Volume Material yg Dihasilkan (m3) - 1,755.00 - - - - - - - - - - - - 1,755.00 250.71 3,000.00
8%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - 300.00 - - - - - - - - - - - - 300.00 42.86
Konversi Luasan (Mencapai Target
6 - - - - - - - - - - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) - 27.27 - #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 124.62 300.00
produktivitas Per Jam kalender (m3 / jam) 0.42 0.42 0.42 - - - - - - - - - - - 42%

- 1.50 -

LUASAN 300.00
KUBIKASI 1,755.00
Realisasi Progres Pengerukan Area A sd Minggu ke 99

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 98 Minggu Ke - 99 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 29,413.50 44,862.57 36.93% 1,755.00 300.00 0.25% 31,168.50 45,162.57 37.18%
KUMULATIF TERHADAP KONTRAK 44,141.27 37.18%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 171,096.44 63.90% 300.00 0.11% 171,396.44 64.01%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 luas 99000 23,122.57
Luasan 121,470.39 M2 19,790.00 awal
luas a sampai
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 22,040.00 akhir
tgl 12 april
Rasio Luas CCO Terhadap Kntrak Awal 100.00%
volume a
sampai tgl 12 18056
april
Target Produktivitas Per jam : 179.81 m3 / jam
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari
Sisa Durasi : 20.00 hari
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini Sisa luasan 9,916.11
pengerukan
Volume Material yg Didapat Minggu Ini (V) : 1,755.00 M3 sisa kubikasi 19,178.60 hari ini 420.00 m3/jam

pengerukan
Konversi Luasan yg Didapat (L) : 300.00 M2 eff 3.00 jam 140.00 m3/jam
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 100 Target per hari


Lokasi : 1A jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 50,347.10 m3 kubikasi : 2000 m3
Total Luas : 31,956.11 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
27-Apr-19 28-Apr-19 29-Apr-19 30-Apr-19 01-May-19 02-May-19 03-May-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

A Track Pengerukan
1 Nama Track A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A1.1 A1.1
3 Mulai Pengerukan di STA. 267.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00 150.00 150.00
4 Selesai Pengerukan di STA. 273.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00 273.00 150.00 150.00
5 Panjang Hasil Pengerukan - - - - - - - - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 40 0 40 1.00 80.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.67 0.67 2.33 - 2.33 12.00
0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00

C. Kedalaman Pengerukan 19%


1 Rata - Rata Level Eksisting (m) - - - - - - - - - - - - - 7.70 - 7.70
2 Rata - Rata Level Dikeruk (m) - - - - - - - - - - - - - 13.55 - 13.55
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - - - - - 5.85 5.85 11.70 2.93

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) - - - - - - - - - - - - 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - - - - - 5.85 5.85 11.70 1.67
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - - - - - - - - 3,000.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - - - - - - - - - - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! - - - 300.00
produktivitas Per Jam kalender (m3 / jam) - - - - - - - - - - - - 0.42 0.42 0%

- 0.00 #DIV/0!

LUASAN -
KUBIKASI -
Realisasi Progres Pengerukan Area A sd Minggu ke 100

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 99 Minggu Ke - 100 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 31,168.50 45,162.57 37.18% - 5,460.00 4.49% 31,168.50 50,622.57 41.67%
KUMULATIF TERHADAP KONTRAK 49,477.80 41.67%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 171,396.44 64.01% 5,460.00 2.04% 176,856.44 66.05%

A. Target Pengerukan Termijn 6 30,579.91


Volume 533,081.28 M3 25.17% luas 99000 23,122.57
Luasan 121,470.39 M2 134,202.05 19,790.00 awal
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 398,879.23 luas a sampai 27,500.00 akhir
tgl 12 april
Rasio Luas CCO Terhadap Kntrak Awal 100.00%
volume a
sampai tgl 12 18056
april
Target Produktivitas Per jam : 179.81 m3 / jam
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari
Sisa Durasi : 20.00 hari
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini Sisa luasan 4,456.11

Volume Material yg Didapat Minggu Ini (V) : - M3 sisa kubikasi 19,178.60 pengerukan 420.00 m3/jam
hari ini

Konversi Luasan yg Didapat (L) : - M2 pengerukan 3.00 jam 140.00 m3/jam


eff
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 101 Target per hari


Lokasi : 1A jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 50,347.10 m3 kubikasi : 2000 m3
Total Luas : 31,956.11 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
04-May-19 05-May-19 06-May-19 07-May-19 08-May-19 09-May-19 10-May-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

A Track Pengerukan
1 Nama Track A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1
3 Mulai Pengerukan di STA. 150.00 150.00 150.00 150.00 156.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00
4 Selesai Pengerukan di STA. 150.00 150.00 150.00 156.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00
5 Panjang Hasil Pengerukan - - 6.00 14.00 - - - - - - - - - - 20.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 2 0 4 15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6.00 15.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 2.00 4.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.25 - 6.25 12.00
0.00 1.00 0.00 0.00 0.00 0.00 0.00 1.00

C. Kedalaman Pengerukan 52%


1 Rata - Rata Level Eksisting (m) - - - 13.55 - 13.55 - - - - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - 13.55 - 13.55 - - - - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) - - 50.00 50.00 - - - - - - - - - - 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - 6.00 14.00 - - - - - - - - - - 20.00 2.86
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - - - - - - - - 3,000.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - - - - - - - - - - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! - - #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! - 300.00
produktivitas Per Jam kalender (m3 / jam) - - - - - - - - - - - - - - 0%

- 6.25 -

LUASAN -
KUBIKASI -
Realisasi Progres Pengerukan Area A sd Minggu ke 101

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 100 Minggu Ke - 101 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 31,168.50 50,622.57 41.67% - - 0.00% 31,168.50 50,622.57 41.67%
KUMULATIF TERHADAP KONTRAK 49,477.80 41.67%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 176,856.44 66.05% - 0.00% 176,856.44 66.05%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 luas 99000 23,122.57
Luasan 121,470.39 M2 19,790.00 awal
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 luas a sampai 22,040.00 akhir
tgl 12 april
Rasio Luas CCO Terhadap Kntrak Awal 100.00%
volume a
sampai tgl 12 18056
april
Target Produktivitas Per jam : 179.81 m3 / jam
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari
Sisa Durasi : 20.00 hari
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini Sisa luasan 9,916.11

Volume Material yg Didapat Minggu Ini (V) : - M3 sisa kubikasi 19,178.60 pengerukan 420.00 m3/jam
hari ini

Konversi Luasan yg Didapat (L) : - M2 pengerukan 3.00 jam 140.00 m3/jam


eff
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 102 Target per hari


Lokasi : 1A jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 50,347.10 m3 kubikasi : 2000 m3
Total Luas : 31,956.11 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
11-May-19 12-May-19 13-May-19 14-May-19 15-May-19 16-May-19 17-May-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

A Track Pengerukan
1 Nama Track A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1
3 Mulai Pengerukan di STA. 150.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00
4 Selesai Pengerukan di STA. 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00
5 Panjang Hasil Pengerukan - - - - - - - - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - #DIV/0! 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan #DIV/0!


1 Rata - Rata Level Eksisting (m) - - - - - - - - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - - - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) - - - - - - - - - - - - - - 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - - - - - - - - 3,000.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - - - - - - - - - - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) - - - - - - - - - - - - - - #DIV/0!

- 0.00 #DIV/0!

LUASAN -
KUBIKASI -
Realisasi Progres Pengerukan Area A sd Minggu ke 102

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 101 Minggu Ke - 102 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 31,168.50 50,622.57 41.67% - - 0.00% 31,168.50 50,622.57 41.67%
KUMULATIF TERHADAP KONTRAK 49,477.80 41.67%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 176,856.44 66.05% - 0.00% 176,856.44 66.05%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 luas 99000 23,122.57
Luasan 121,470.39 M2 19,790.00 awal
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 luas a sampai 22,040.00 akhir
tgl 12 april
Rasio Luas CCO Terhadap Kntrak Awal 100.00%
volume a
sampai tgl 12 18056
april
Target Produktivitas Per jam : 179.81 m3 / jam
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari
Sisa Durasi : 20.00 hari
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini Sisa luasan 9,916.11

Volume Material yg Didapat Minggu Ini (V) : - M3 sisa kubikasi 19,178.60 pengerukan 420.00 m3/jam
hari ini

Konversi Luasan yg Didapat (L) : - M2 pengerukan 3.00 jam 140.00 m3/jam


eff
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 103 Target per hari


Lokasi : 1A jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 50,347.10 m3 kubikasi : 2000 m3
Total Luas : 31,956.11 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
18-May-19 19-May-19 20-May-19 21-May-19 22-May-19 23-May-19 24-May-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

A Track Pengerukan
1 Nama Track A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1
3 Mulai Pengerukan di STA. 150.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00
4 Selesai Pengerukan di STA. 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00
5 Panjang Hasil Pengerukan - - - - - - - - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - #DIV/0! 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan #DIV/0!


1 Rata - Rata Level Eksisting (m) - - - - - - - - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - - - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) - - - - - - - - - - - - - - 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - - - - - - - - 3,000.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - - - - - - - - - - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) - - - - - - - - - - - - - - #DIV/0!

- 0.00 #DIV/0!

LUASAN -
KUBIKASI -
Realisasi Progres Pengerukan Area A sd Minggu ke 101

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 100 Minggu Ke - 101 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 31,168.50 50,622.57 41.67% - - 0.00% 31,168.50 50,622.57 41.67%
KUMULATIF TERHADAP KONTRAK 49,477.80 41.67%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 176,856.44 66.05% - 0.00% 176,856.44 66.05%

A. Target Pengerukan Termijn 6 27,500.00


Volume 533,081.28 M3 luas 99000 23,122.57
Luasan 121,470.39 M2 19,790.00 awal
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 luas a sampai 22,040.00 akhir
tgl 12 april
Rasio Luas CCO Terhadap Kntrak Awal 100.00%
volume a
sampai tgl 12 18056
april
Target Produktivitas Per jam : 179.81 m3 / jam
Rencana Jam Kerja : 14.00 jam / hari luasan 27500
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 5,460.00
Sisa Durasi : 20.00 hari
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini Sisa luasan 9,916.11

Volume Material yg Didapat Minggu Ini (V) : - M3 sisa kubikasi 19,178.60 pengerukan 420.00 m3/jam
hari ini

Konversi Luasan yg Didapat (L) : - M2 pengerukan 3.00 jam 140.00 m3/jam


eff
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 104 Target per hari


Lokasi : 1A jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 50,347.10 m3 kubikasi : 2000 m3
Total Luas : 31,956.11 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
25-May-19 26-May-19 27-May-19 28-May-19 29-May-19 30-May-19 31-May-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

A Track Pengerukan
1 Nama Track A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1
3 Mulai Pengerukan di STA. 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00
4 Selesai Pengerukan di STA. 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00
5 Panjang Hasil Pengerukan - - - - - - - - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - #DIV/0! 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan #DIV/0!


1 Rata - Rata Level Eksisting (m) - - - - - - - - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - - - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) - - - - - - - - - - - - - - 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - - - - - - - - 3,000.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - - - - - - - - - - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) - - - - - - - - - - - - - - #DIV/0!

- 0.00 #DIV/0!

LUASAN -
KUBIKASI -
Realisasi Progres Pengerukan Area A sd Minggu ke 101

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 100 Minggu Ke - 101 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 31,168.50 50,622.57 41.67% - - 0.00% 31,168.50 50,622.57 41.67%
KUMULATIF TERHADAP KONTRAK 49,477.80 41.67%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 176,856.44 66.05% - 0.00% 176,856.44 66.05%

A. Target Pengerukan Termijn 6 27,500.00


Volume 533,081.28 M3 luas 99000 23,122.57
Luasan 121,470.39 M2 19,790.00 awal
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 luas a sampai 22,040.00 akhir
tgl 12 april
Rasio Luas CCO Terhadap Kntrak Awal 100.00%
volume a
sampai tgl 12 18056
april
Target Produktivitas Per jam : 179.81 m3 / jam
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari
Sisa Durasi : 20.00 hari
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini Sisa luasan 9,916.11

Volume Material yg Didapat Minggu Ini (V) : - M3 sisa kubikasi 19,178.60 pengerukan 420.00 m3/jam
hari ini

Konversi Luasan yg Didapat (L) : - M2 pengerukan 3.00 jam 140.00 m3/jam


eff
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 105 Target per hari


Lokasi : 1A jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 50,347.10 m3 kubikasi : 2000 m3
Total Luas : 31,956.11 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
01-Jun-19 02-Jun-19 03-Jun-19 04-Jun-19 05-Jun-19 06-Jun-19 07-Jun-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

A Track Pengerukan
1 Nama Track A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1
3 Mulai Pengerukan di STA. 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00
4 Selesai Pengerukan di STA. 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00
5 Panjang Hasil Pengerukan - - - - - - - - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - #DIV/0! 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan #DIV/0!


1 Rata - Rata Level Eksisting (m) - - - - - - - - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - - - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) - - - - - - - - - - - - - - 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - - - - - - - - 3,000.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - - - - - - - - - - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) - - - - - - - - - - - - - - #DIV/0!

- 0.00 #DIV/0!

LUASAN -
KUBIKASI -
Realisasi Progres Pengerukan Area A sd Minggu ke 105

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 104 Minggu Ke - 105 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 31,168.50 50,622.57 41.67% - - 0.00% 31,168.50 50,622.57 41.67%
KUMULATIF TERHADAP KONTRAK 49,477.80 41.67%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 176,856.44 66.05% - 0.00% 176,856.44 66.05%

A. Target Pengerukan Termijn 6 27,500.00


Volume 533,081.28 M3 luas 99000 23,122.57
Luasan 121,470.39 M2 19,790.00 awal
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 luas a sampai 22,040.00 akhir
tgl 12 april
Rasio Luas CCO Terhadap Kntrak Awal 100.00%
volume a
sampai tgl 12 18056
april
Target Produktivitas Per jam : 179.81 m3 / jam
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari
Sisa Durasi : 20.00 hari
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini Sisa luasan 9,916.11

Volume Material yg Didapat Minggu Ini (V) : - M3 sisa kubikasi 19,178.60 pengerukan 420.00 m3/jam
hari ini

Konversi Luasan yg Didapat (L) : - M2 pengerukan 3.00 jam 140.00 m3/jam


eff
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 106 Target per hari


Lokasi : 1A jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 50,347.10 m3 kubikasi : 2000 m3
Total Luas : 31,956.11 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
08-Jun-19 09-Jun-19 10-Jun-19 11-Jun-19 12-Jun-19 13-Jun-19 14-Jun-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

A Track Pengerukan
1 Nama Track A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1
3 Mulai Pengerukan di STA. 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00
4 Selesai Pengerukan di STA. 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00
5 Panjang Hasil Pengerukan - - - - - - - - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - #DIV/0! 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan #DIV/0!


1 Rata - Rata Level Eksisting (m) - - - - - - - - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - - - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) - - - - - - - - - - - - - - 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - - - - - - - - 3,000.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - - - - - - - - - - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) - - - - - - - - - - - - - - #DIV/0!

- 0.00 #DIV/0!

LUASAN -
KUBIKASI -
Realisasi Progres Pengerukan Area A sd Minggu ke 106

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 105 Minggu Ke - 106 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 31,168.50 50,622.57 41.67% - - 0.00% 31,168.50 50,622.57 41.67%
KUMULATIF TERHADAP KONTRAK 49,477.80 41.67%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 176,856.44 66.05% - 0.00% 176,856.44 66.05%

A. Target Pengerukan Termijn 6 27,500.00


Volume 533,081.28 M3 luas 99000 23,122.57
Luasan 121,470.39 M2 19,790.00 awal
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 luas a sampai 22,040.00 akhir
tgl 12 april
Rasio Luas CCO Terhadap Kntrak Awal 100.00%
volume a
sampai tgl 12 18056
april
Target Produktivitas Per jam : 179.81 m3 / jam
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari
Sisa Durasi : 20.00 hari
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini Sisa luasan 9,916.11

Volume Material yg Didapat Minggu Ini (V) : - M3 sisa kubikasi 19,178.60 pengerukan 420.00 m3/jam
hari ini

Konversi Luasan yg Didapat (L) : - M2 pengerukan 3.00 jam 140.00 m3/jam


eff
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 107 Target per hari


Lokasi : 1A jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 50,347.10 m3 kubikasi : 2000 m3
Total Luas : 31,956.11 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
15-Jun-19 16-Jun-19 17-Jun-19 18-Jun-19 19-Jun-19 20-Jun-19 21-Jun-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

A Track Pengerukan
1 Nama Track A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1
3 Mulai Pengerukan di STA. 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00
4 Selesai Pengerukan di STA. 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00
5 Panjang Hasil Pengerukan - - - - - - - - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - #DIV/0! 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan #DIV/0!


1 Rata - Rata Level Eksisting (m) - - - - - - - - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - - - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) - - - - - - - - - - - - - - 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - - - - - - - - 3,000.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - - - - - - - - - - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) - - - - - - - - - - - - - - #DIV/0!

- 0.00 #DIV/0!

LUASAN -
KUBIKASI -
Realisasi Progres Pengerukan Area A sd Minggu ke 107

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 106 Minggu Ke - 107 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 31,168.50 50,622.57 41.67% - - 0.00% 31,168.50 50,622.57 41.67%
KUMULATIF TERHADAP KONTRAK 49,477.80 41.67%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 176,856.44 66.05% - 0.00% 176,856.44 66.05%

A. Target Pengerukan Termijn 6 27,500.00


Volume 533,081.28 M3 luas 99000 23,122.57
Luasan 121,470.39 M2 19,790.00 awal
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 luas a sampai 22,040.00 akhir
tgl 12 april
Rasio Luas CCO Terhadap Kntrak Awal 100.00%
volume a
sampai tgl 12 18056
april
Target Produktivitas Per jam : 179.81 m3 / jam
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari
Sisa Durasi : 20.00 hari
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini Sisa luasan 9,916.11

Volume Material yg Didapat Minggu Ini (V) : - M3 sisa kubikasi 19,178.60 pengerukan 420.00 m3/jam
hari ini

Konversi Luasan yg Didapat (L) : - M2 pengerukan 3.00 jam 140.00 m3/jam


eff
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 108 Target per hari


Lokasi : 1A jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 50,347.10 m3 kubikasi : 2000 m3
Total Luas : 31,956.11 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
22-Jun-19 23-Jun-19 24-Jun-19 25-Jun-19 26-Jun-19 27-Jun-19 28-Jun-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

A Track Pengerukan
1 Nama Track A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1
3 Mulai Pengerukan di STA. 170.00 170.00 170.00 170.00 170.00 170.00 180.00 190.00 190.00 190.00 190.00 190.00 190.00 190.00 190.00
4 Selesai Pengerukan di STA. 170.00 170.00 170.00 170.00 170.00 180.00 190.00 190.00 190.00 190.00 190.00 190.00 190.00 190.00 190.00
5 Panjang Hasil Pengerukan - - - - 10.00 10.00 - - - - - - - - 20.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 6 45 8 40 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14.00 85.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 6.75 8.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.42 - 15.42 12.00
0.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00

C. Kedalaman Pengerukan 128%


1 Rata - Rata Level Eksisting (m) - - - - - 12.00 - 12.00 - - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - 13.55 - 13.55 - - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - 1.55 1.55 - - - - - - - - 3.10 0.78

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) - - - - 42.00 42.00 - - - - - - - - 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - 10.00 10.00 - - - - - - - - 20.00 2.86
3 Ketebalan Area yg Dikeruk (m) - - - - 1.55 1.55 - - - - - - - - 3.10 0.44
4 Volume Material yg Dihasilkan (m3) - - - - 651.00 651.00 - - - - - - - - 1,302.00 186.00 3,000.00
6%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - 420.00 420.00 - - - - - - - - 840.00 120.00
Konversi Luasan (Mencapai Target
6 - - - - - - - - - - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! 62.22 48.46 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 84.45 300.00
produktivitas Per Jam kalender (m3 / jam) - - - - 0.11 0.11 - - - - - - - - 28%

1,302.00 15.42 84.45

LUASAN 840.00
KUBIKASI 1,302.00
Realisasi Progres Pengerukan Area A sd Minggu ke 108

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 107 Minggu Ke - 108 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 31,168.50 50,622.57 41.67% 1,302.00 840.00 0.69% 32,470.50 51,462.57 42.37%
KUMULATIF TERHADAP KONTRAK 50,298.80 42.37%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 176,856.44 66.05% 840.00 0.31% 177,696.44 66.37%

A. Target Pengerukan Termijn 6 28,340.00


Volume 533,081.28 M3 luas 99000 23,122.57
Luasan 121,470.39 M2 19,790.00 awal
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 luas a sampai 22,880.00 akhir
tgl 12 april
Rasio Luas CCO Terhadap Kntrak Awal 100.00%
volume a
sampai tgl 12 18056
april
Target Produktivitas Per jam : 179.81 m3 / jam
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari
Sisa Durasi : 20.00 hari
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini Sisa luasan 9,076.11

Volume Material yg Didapat Minggu Ini (V) : 1,302.00 M3 sisa kubikasi 17,876.60 pengerukan 420.00 m3/jam
hari ini

Konversi Luasan yg Didapat (L) : 840.00 M2 pengerukan 3.00 jam 140.00 m3/jam
eff
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 109 Target per hari


Lokasi : 1A jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 50,347.10 m3 kubikasi : 2000 m3
Total Luas : 31,956.11 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
29-Jun-19 30-Jun-19 01-Jul-19 02-Jul-19 03-Jul-19 04-Jul-19 05-Jul-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

A Track Pengerukan
1 Nama Track A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1
3 Mulai Pengerukan di STA. 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00
4 Selesai Pengerukan di STA. 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00
5 Panjang Hasil Pengerukan - - - - - - - - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - #DIV/0! 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan #DIV/0!


1 Rata - Rata Level Eksisting (m) - - - - - - - - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - - - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) - - - - - - - - - - - - - - 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - - - - - - - - 3,000.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - - - - - - - - - - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) - - - - - - - - - - - - - - #DIV/0!

- 0.00 #DIV/0!

LUASAN -
KUBIKASI -
Realisasi Progres Pengerukan Area A sd Minggu ke 109

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 108 Minggu Ke - 109 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 32,470.50 51,462.57 42.37% - - 0.00% 32,470.50 51,462.57 42.37%
KUMULATIF TERHADAP KONTRAK 50,298.80 42.37%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 177,696.44 66.37% - 0.00% 177,696.44 66.37%

A. Target Pengerukan Termijn 6 28,340.00


Volume 533,081.28 M3 luas 99000 23,122.57
Luasan 121,470.39 M2 19,790.00 awal
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 luas a sampai 22,040.00 akhir
tgl 12 april
Rasio Luas CCO Terhadap Kntrak Awal 100.00%
volume a
sampai tgl 12 18056
april
Target Produktivitas Per jam : 179.81 m3 / jam
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari
Sisa Durasi : 20.00 hari
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini Sisa luasan 9,916.11

Volume Material yg Didapat Minggu Ini (V) : - M3 sisa kubikasi 17,876.60 pengerukan 420.00 m3/jam
hari ini

Konversi Luasan yg Didapat (L) : - M2 pengerukan 3.00 jam 140.00 m3/jam


eff
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 110 Target per hari


Lokasi : 1A jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 50,347.10 m3 kubikasi : 2000 m3
Total Luas : 31,956.11 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
06-Jul-19 07-Jul-19 08-Jul-19 09-Jul-19 10-Jul-19 11-Jul-19 12-Jul-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

A Track Pengerukan
1 Nama Track A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1
3 Mulai Pengerukan di STA. 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00
4 Selesai Pengerukan di STA. 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00
5 Panjang Hasil Pengerukan - - - - - - - - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - #DIV/0! 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan #DIV/0!


1 Rata - Rata Level Eksisting (m) - - - - - - - - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - - - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) - - - - - - - - - - - - - - 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - - - - - - - - 3,000.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - - - - - - - - - - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) - - - - - - - - - - - - - - #DIV/0!

- 0.00 #DIV/0!

LUASAN -
KUBIKASI -
Realisasi Progres Pengerukan Area A sd Minggu ke 110

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 109 Minggu Ke - 110 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 32,470.50 51,462.57 42.37% - - 0.00% 32,470.50 51,462.57 42.37%
KUMULATIF TERHADAP KONTRAK 50,298.80 42.37%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 177,696.44 66.37% - 0.00% 177,696.44 66.37%

A. Target Pengerukan Termijn 6 28,340.00


Volume 533,081.28 M3 luas 99000 23,122.57
Luasan 121,470.39 M2 19,790.00 awal
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 luas a sampai 22,040.00 akhir
tgl 12 april
Rasio Luas CCO Terhadap Kntrak Awal 100.00%
volume a
sampai tgl 12 18056
april
Target Produktivitas Per jam : 179.81 m3 / jam
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari
Sisa Durasi : 20.00 hari
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini Sisa luasan 9,916.11

Volume Material yg Didapat Minggu Ini (V) : - M3 sisa kubikasi 17,876.60 pengerukan 420.00 m3/jam
hari ini

Konversi Luasan yg Didapat (L) : - M2 pengerukan 3.00 jam 140.00 m3/jam


eff
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 111 Target per hari


Lokasi : 1A jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 50,347.10 m3 kubikasi : 2000 m3
Total Luas : 31,956.11 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
13-Jul-19 14-Jul-19 15-Jul-19 16-Jul-19 17-Jul-19 18-Jul-19 19-Jul-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

A Track Pengerukan
1 Nama Track A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1
3 Mulai Pengerukan di STA. 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00
4 Selesai Pengerukan di STA. 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00
5 Panjang Hasil Pengerukan - - - - - - - - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - #DIV/0! 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan #DIV/0!


1 Rata - Rata Level Eksisting (m) - - - - - - - - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - - - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) - - - - - - - - - - - - - - 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - - - - - - - - 3,000.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - - - - - - - - - - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) - - - - - - - - - - - - - - #DIV/0!

- 0.00 #DIV/0!

LUASAN -
KUBIKASI -
Realisasi Progres Pengerukan Area A sd Minggu ke 111

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 110 Minggu Ke - 111 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 32,470.50 51,462.57 42.37% 92,000.00 40,374.84 33.24% 124,470.50 91,837.41 75.60%
KUMULATIF TERHADAP KONTRAK 89,760.61 75.60%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 177,696.44 66.37% 40,374.84 15.08% 218,071.28 81.45%

A. Target Pengerukan Termijn 6 68,714.84


Volume 533,081.28 M3 40374.84177 luas 99000 23,122.57
Luasan 121,470.39 M2 19,790.00 awal
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 luas a sampai tgl 62,414.84 akhir
12 april
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

volume a sampai 18056


tgl 12 april

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari
Sisa Durasi : 20.00 hari
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini Sisa luasan - 30,458.73

Volume Material yg Didapat Minggu Ini (V) : - M3 sisa kubikasi - 74,123.40 pengerukan hari 420.00 m3/jam
ini

Konversi Luasan yg Didapat (L) : - M2 pengerukan 3.00 jam 140.00 m3/jam


eff
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 111 Target per hari


Lokasi : 1A jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 50,347.10 m3 kubikasi : 2000 m3
Total Luas : 31,956.11 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
13-Jul-19 14-Jul-19 15-Jul-19 16-Jul-19 17-Jul-19 18-Jul-19 19-Jul-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

A Track Pengerukan
1 Nama Track A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1
3 Mulai Pengerukan di STA. 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00
4 Selesai Pengerukan di STA. 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00
5 Panjang Hasil Pengerukan - - - - - - - - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - #DIV/0! 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan #DIV/0!


1 Rata - Rata Level Eksisting (m) - - - - - - - - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - - - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) - - - - - - - - - - - - - - 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - - - - - - - - 3,000.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - - - - - - - - - - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) - - - - - - - - - - - - - - #DIV/0!

- 0.00 #DIV/0!

LUASAN -
KUBIKASI -
Realisasi Progres Pengerukan Area A sd Minggu ke 111

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 110 Minggu Ke - 111 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 32,470.50 51,462.57 42.37% - - 0.00% 32,470.50 51,462.57 42.37%
KUMULATIF TERHADAP KONTRAK 50,298.80 42.37%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 177,696.44 66.37% - 0.00% 177,696.44 66.37%

A. Target Pengerukan Termijn 6 28,340.00


Volume 533,081.28 M3 0 luas 99000 23,122.57
Luasan 121,470.39 M2 19,790.00 awal
luas a sampai tgl
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 22,040.00 akhir
12 april
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

volume a sampai
18056
tgl 12 april

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari
Sisa Durasi : 20.00 hari
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini Sisa luasan 9,916.11
pengerukan hari
Volume Material yg Didapat Minggu Ini (V) : - M3 sisa kubikasi 17,876.60 420.00 m3/jam
ini
pengerukan
Konversi Luasan yg Didapat (L) : - M2 3.00 jam 140.00 m3/jam
eff
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 111 Target per hari


Lokasi : 1A jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 50,347.10 m3 kubikasi : 2000 m3
Total Luas : 31,956.11 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
20-Jul-19 21-Jul-19 22-Jul-19 23-Jul-19 24-Jul-19 25-Jul-19 26-Jul-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

A Track Pengerukan
1 Nama Track A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1 A1.1
3 Mulai Pengerukan di STA. 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00
4 Selesai Pengerukan di STA. 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00 170.00
5 Panjang Hasil Pengerukan - - - - - - - - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - #DIV/0! 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan #DIV/0!


1 Rata - Rata Level Eksisting (m) - - - - - - - - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - - - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) - - - - - - - - - - - - - - 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - - - - - - - - 3,000.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - - - - - - - - - - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) - - - - - - - - - - - - - - #DIV/0!

- 0.00 #DIV/0!

LUASAN -
KUBIKASI -
Realisasi Progres Pengerukan Area A sd Minggu ke 112

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 111 Minggu Ke - 112 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2)

1 Area Dredging - 1 121,470.39 M2 32,470.50 51,462.57 42.37% - - 0.00% 32,470.50 51,462.57


KUMULATIF TERHADAP KONTRAK 50,298.80
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87

Jumlah 267,746.92 M2 177,696.44 66.37% - 0.00% 177,696.44

312,341.49 220,739.79
A. Target Pengerukan Termijn 6 28,340.00
Volume 533,081.28 M3 0 luas 99000 23,122.57
Luasan 121,470.39 M2 533081.28 19,790.00
luas a sampai tgl
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 58.9651550685978 22,040.00
12 april
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 117,930.31

volume a sampai
72,930.31 167.571 5.585.70 18056
tgl 12 april

Target Produktivitas Per jam : 179.81 m3 / jam 67028.4 3,952,340.00


Rencana Jam Kerja : 14.00 jam / hari 431137.724550898
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 5,000,000,000.00 53,625.25 26.81
Sisa Durasi : 20.00 hari 93239.66541
harga permeter
Volume Didapat : 50,347.10 m3 105.97
kubik
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini Sisa luasan 9,916.11
pengerukan hari
Volume Material yg Didapat Minggu Ini (V) : - M3 sisa kubikasi 17,876.60 420.00
ini
Konversi Luasan yg Didapat (L) : - M2 pengerukan eff 3.00 jam 140.00
engerukan Area A sd Minggu ke 112

Progres Realisasi (Tagihan ke-7)


Komulatif
%

42.37%
42.37%
86.30%

66.37%

awal
akhir

m3/jam

m3/jam
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 113 Target per hari


Lokasi : 1A jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 50,347.10 m3 kubikasi : 2000 m3
Total Luas : 31,956.11 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
27-Jul-19 28-Jul-19 29-Jul-19 30-Jul-19 31-Jul-19 01-Aug-19 02-Aug-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

A Track Pengerukan
1 Nama Track A1.1 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2
3 Mulai Pengerukan di STA. 170.00 170.00 170.00 170.00 178.00 186.00 186.00 186.00 202.00 202.00 214.00 214.00 232.00 232.00 270.00
4 Selesai Pengerukan di STA. 170.00 170.00 170.00 178.00 186.00 186.00 186.00 202.00 202.00 214.00 214.00 232.00 232.00 270.00 270.00
5 Panjang Hasil Pengerukan - - 8.00 8.00 - - 16.00 - 12.00 - 18.00 - 38.00 - 100.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 1 30 0 0 7 58 7 8 0 0 0 0 6 92 0 0 15 5 15 0 0 0 14 0 0 0 65.00 193.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 1.50 0.00 7.97 7.13 0.00 0.00 7.53 0.00 15.08 0.00 15.00 0.00 14.00 0.00 68.22 1.00 11.37 12.00
1.00 1.00 0.00 1.00 1.00 1.00 1.00 6.00

C. Kedalaman Pengerukan 95%


1 Rata - Rata Level Eksisting (m) - - - 6.00 - 6.00 - - - 6.00 - - 9.00 - - 10.00 - - 12.00 -
2 Rata - Rata Level Dikeruk (m) - - - 12.00 - 12.00 - - - 12.00 - - 13.55 - - 12.00 - - 12.70 -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - 6.00 6.00 - - 6.00 - 4.55 - 2.00 - 0.70 - 25.25 6.31

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) - - 50.00 50.00 - - 50.00 - 50.00 - 50.00 - 50.00 - 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - 8.00 8.00 - - 16.00 - 12.00 - 18.00 - 38.00 - 100.00 14.29
3 Ketebalan Area yg Dikeruk (m) - - 6.00 6.00 - - 6.00 - 4.55 - 2.00 - 0.70 - 25.25 3.61
4 Volume Material yg Dihasilkan (m3) - - 2,400.00 2,400.00 - - 4,800.00 - 2,730.00 - 1,800.00 - 1,330.00 - 15,460.00 2,208.57 3,000.00
74%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - 400.00 400.00 - - 800.00 - 600.00 - 900.00 - 1,900.00 - 5,000.00 714.29

6 Konversi Luasan (Mencapai Target - - - - - - - - - - - - - - - -


-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) - #DIV/0! 301.26 336.45 #DIV/0! #DIV/0! 637.17 #DIV/0! 180.99 #DIV/0! 60.00 #DIV/0! 135.71 #DIV/0! 226.63 300.00
produktivitas Per Jam kalender (m3 / jam) - - 0.43 0.43 - - 0.43 - 0.33 - 0.14 - 0.05 - 76%

1330.00 14.00 95.00


Realisasi Progres Pengerukan Area A sd Minggu ke 113

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 112 Minggu Ke - 113 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 32,470.50 51,462.57 42.37% 15,460.00 5,000.00 4.12% 47,930.50 56,462.57 46.48%
KUMULATIF TERHADAP KONTRAK 55,185.73 46.48%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 177,696.44 66.37% 5,000.00 1.87% 182,696.44 68.23%

A. Target Pengerukan Termijn 6 33,340.00


Volume 533,081.28 M3 6784.728845 luas 99000 23,122.57
Luasan 121,470.39 M2 19,790.00 awal
luas a sampai tgl
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 27,040.00 akhir
12 april
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

volume a sampai
18056
tgl 12 april

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari sisa pengerukan baty
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 10,208.00 5,408.00
Sisa Durasi : 20.00 hari 2,678.00
Volume Didapat : 50,347.10 m3 878.00
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini Sisa luasan 4,916.11
pengerukan hari
Volume Material yg Didapat Minggu Ini (V) : 15,460.00 M3 sisa kubikasi 2,416.60 420.00 m3/jam
ini
pengerukan
Konversi Luasan yg Didapat (L) : 5,000.00 M2 3.00 jam 140.00 m3/jam
eff
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 114 Target per hari


Lokasi : 1A jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 50,347.10 m3 kubikasi : 2000 m3
Total Luas : 31,956.11 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
03-Aug-19 04-Aug-19 05-Aug-19 06-Aug-19 07-Aug-19 08-Aug-19 09-Aug-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

A Track Pengerukan
1 Nama Track A1.1 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2 A2.2
3 Mulai Pengerukan di STA. 170.00 270.00 232.00 267.00 279.00 290.00 286.00 286.00
4 Selesai Pengerukan di STA. 170.00 282.00 238.00 278.00 290.00 292.00 289.00 292.00
5 Panjang Hasil Pengerukan 12.00 6.00 11.00 11.00 2.00 3.00 6.00 51.00 51.00

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 7 15 8 0 16 50 15 10 8 40 10 50 14 25 78.00 190.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 7.25 8.00 16.83 15.17 8.67 10.83 14.42 81.17 1.00 11.60 12.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 7.00

C. Kedalaman Pengerukan 97%


1 Rata - Rata Level Eksisting (m) - 12.00 - 12.00 - 12.00 - 8.30 - 8.30 - 12.00 - 10.00
2 Rata - Rata Level Dikeruk (m) - 12.70 - 13.10 - 13.40 - 12.80 - 12.10 - 13.00 - 12.90
3 Rata - Rata Ketebalan yg Dikeruk (m) 0.70 1.10 1.40 4.50 3.80 1.00 2.90 15.40 3.85

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 12.00 6.00 11.00 11.00 2.00 3.00 6.00 51.00 7.29
3 Ketebalan Area yg Dikeruk (m) 0.70 1.10 1.40 4.50 3.80 1.00 2.90 15.40 2.20
4 Volume Material yg Dihasilkan (m3) 420.00 330.00 770.00 2,475.00 380.00 150.00 870.00 5,395.00 770.71 3,000.00
26%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 600.00 300.00 550.00 550.00 100.00 150.00 300.00 2,550.00 364.29

6 Konversi Luasan (Mencapai Target - - - - - - - - -


-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 82.76 37.50 32.67 36.26 11.54 13.85 20.81 66.47 300.00
produktivitas Per Jam kalender (m3 / jam) 0.05 0.08 0.10 0.32 0.27 0.07 0.21 22%

870.00 14.42 60.35


Realisasi Progres Pengerukan Area A sd Minggu ke 114

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 113 Minggu Ke - 114 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 47,930.50 56,462.57 46.48% 5,395.00 2,550.00 2.10% 53,325.50 59,012.57 48.58%
KUMULATIF TERHADAP KONTRAK 57,678.07 48.58%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 182,696.44 68.23% 2,550.00 0.95% 185,246.44 69.19%

A. Target Pengerukan Termijn 6 35,890.00


Volume 533,081.28 M3 2367.633384 luas 99000 23,122.57
Luasan 121,470.39 M2 19,790.00 awal
luas a sampai tgl
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 24,590.00 akhir
12 april
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

volume a sampai
18056
tgl 12 april

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari sisa pengerukan baty
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 10,208.00 5,408.00
Sisa Durasi : 20.00 hari 2,678.00
Volume Didapat : 50,347.10 m3 878.00
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini Sisa luasan 7,366.11
pengerukan hari
Volume Material yg Didapat Minggu Ini (V) : 5,395.00 M3 sisa kubikasi - 2,978.40 420.00 m3/jam
ini
pengerukan
Konversi Luasan yg Didapat (L) : 2,550.00 M2 3.00 jam 140.00 m3/jam
eff
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 115 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 206,654.00 m3 kubikasi : 2000 m3
Total Luas : 28,723.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m 348
lebar : 50 m 344 4

Tanggal
10-Aug-19 11-Aug-19 12-Aug-19 13-Aug-19 14-Aug-19 15-Aug-19 16-Aug-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam Siang Malam

A Track Pengerukan
1 Nama Track A2.2 A2.2 A2.2 A2.2 A2.2 B B B B
3 Mulai Pengerukan di STA. 292.00 281.00 297.00 308.00 318.00 210.00 210.00 190.00 190.00
4 Selesai Pengerukan di STA. 296.00 297.00 308.00 318.00 321.00 214.00 216.00 200.00 195.00
5 Panjang Hasil Pengerukan 4.00 16.00 11.00 10.00 3.00 4.00 6.00 10.00 5.00 69.00 69.00

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 17 10 11 55 10 0 16 45 2 40 9 15 2 30 9 20 7 20 83.00 235.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 17.17 11.92 10.00 16.75 2.67 9.25 2.50 9.33 7.33 86.92 1.00 21.73 12.00
1.00 1.00 1.00 1.00 4.00

C. Kedalaman Pengerukan 181%


1 Rata - Rata Level Eksisting (m) - 8.30 - 7.30 - 10.00 - 10.00 - 10.00 - 6.00 - 6.80 - 4.00 - 6.00
2 Rata - Rata Level Dikeruk (m) - 11.80 - 10.00 - 13.55 - 13.00 - 13.00 - 8.50 - 10.50 - 8.50 - 10.00
3 Rata - Rata Ketebalan yg Dikeruk (m) 3.50 2.70 3.55 3.00 3.00 2.50 3.70 4.50 4.00 30.45 7.61

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 4.00 16.00 11.00 10.00 3.00 4.00 6.00 10.00 5.00 69.00 9.86
3 Ketebalan Area yg Dikeruk (m) 3.50 2.70 3.55 3.00 3.00 2.50 3.70 4.50 4.00 30.45 4.35
4 Volume Material yg Dihasilkan (m3) 700.00 2,160.00 1,952.50 1,500.00 450.00 500.00 1,110.00 2,250.00 1,000.00 11,622.50 1,660.36 3,000.00
55%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 200.00 800.00 550.00 500.00 150.00 200.00 300.00 500.00 250.00 3,450.00 492.86

6 Konversi Luasan (Mencapai Target - - - - - - - - - - -


-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 11.65 67.13 55.00 29.85 56.25 21.62 120.00 53.57 34.09 133.72 300.00
produktivitas Per Jam kalender (m3 / jam) 0.25 0.19 0.25 0.21 0.21 0.18 0.26 0.32 0.29 45%

97.50 1,597.50 2,840.00 1000.00 7.33 136.36 ### 39,500.00

36,140.00
35,140.00
Realisasi Progres Pengerukan Area A sd Minggu ke 115

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 114 Minggu Ke - 115 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 53,325.50 59,012.57 48.58% 11,622.50 3,450.00 2.84% 64,948.00 62,462.57 51.42%
KUMULATIF TERHADAP KONTRAK 61,050.05 51.42%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 185,246.44 69.19% 3,450.00 1.29% 188,696.44 70.48%

A. Target Pengerukan Termijn 6 39,340.00


Volume 533,081.28 M3 5100.615201 luas 99000 23,122.57
Luasan 121,470.39 M2 19,790.00 awal
luas a sampai tgl
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 25,490.00 akhir
12 april
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

volume a sampai
18056
tgl 12 april

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari sisa pengerukan baty
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 10,208.00 5,408.00
Sisa Durasi : 20.00 hari 2,678.00
Volume Didapat : 50,347.10 m3 878.00
Luasan Didapat : 31,956.11 m2
area B 4,860.00 m3
B. Realisasi Minggu Ini
Realisasi Pengerukan Minggu Ini Sisa luasan 6,466.11
pengerukan hari
Volume Material yg Didapat Minggu Ini (V) : 11,622.50 M3 sisa kubikasi - 14,600.90 420.00 m3/jam
ini
pengerukan
Konversi Luasan yg Didapat (L) : 3,450.00 M2 3.00 jam 140.00 m3/jam
eff
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 116 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m 348
lebar : 50 m 344 4

Tanggal
17-Aug-19 18-Aug-19 19-Aug-19 20-Aug-19 21-Aug-19 22-Aug-19 23-Aug-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track b b b b b b b
3 Mulai Pengerukan di STA. 195.00 165.00 131.00 131.00 121.00 117.00 127.00
4 Selesai Pengerukan di STA. 213.00 131.00 131.00 131.00 130.00 127.00 145.00
5 Panjang Hasil Pengerukan 18.00 34.00 - - 9.00 10.00 18.00 89.00 89.00

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 9 55 10 10 0 0 0 0 7 5 13 40 12 20 51.00 130.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 9.92 10.17 0.00 0.00 7.08 13.67 12.33 53.17 - 26.58 12.00
1.00 1.00 2.00

C. Kedalaman Pengerukan 222%


1 Rata - Rata Level Eksisting (m) - 7.50 - 3.00 - - - 5.00 - 6.00 - 10.00
2 Rata - Rata Level Dikeruk (m) - 9.00 - 6.00 - - - 8.50 - 9.00 - 10.50
3 Rata - Rata Ketebalan yg Dikeruk (m) 1.50 3.00 - - 3.50 3.00 0.50 11.50 2.88

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 18.00 34.00 - - 9.00 10.00 18.00 89.00 12.71
3 Ketebalan Area yg Dikeruk (m) 1.50 3.00 - - 3.50 3.00 0.50 11.50 1.64
4 Volume Material yg Dihasilkan (m3) 1,350.00 5,100.00 - - 1,575.00 1,500.00 450.00 9,975.00 1,425.00 3,000.00
48%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 900.00 1,700.00 - - 450.00 500.00 900.00 4,450.00 635.71

6 Konversi Luasan (Mencapai Target - - - - - - - - -


-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 90.76 167.21 #DIV/0! #DIV/0! 63.53 36.59 72.97 187.62 300.00
produktivitas Per Jam kalender (m3 / jam) 0.11 0.21 - - 0.25 0.21 0.04 63%

akumulasi 6,210.00 11,310.00 12,885.00 450.00 12.33 36.49 ### 40,000.00

38,500.00
38,050.00
36,700.00
Realisasi Progres Pengerukan Area A sd Minggu ke 116

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 115 Minggu Ke - 116 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 64,948.00 62,462.57 51.42% 9,975.00 4,450.00 3.66% 74,923.00 66,912.57 55.09%
KUMULATIF TERHADAP KONTRAK 65,399.42 55.09%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 188,696.44 70.48% 4,450.00 1.66% 193,146.44 72.14%

A. Target Pengerukan Termijn 6 43,790.00


Volume 533,081.28 M3 4377.598333 luas 99000 23,122.57
Luasan 121,470.39 M2 19,790.00 awal
luas a sampai tgl
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 26,490.00 akhir
12 april
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

volume a sampai
18056
tgl 12 april

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari sisa pengerukan baty
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 10,208.00 5,408.00
Sisa Durasi : 20.00 hari 2,678.00
Volume Didapat : 50,347.10 m3 878.00
Luasan Didapat : 31,956.11 m2
area B 50,172.00 m3
B. Realisasi Minggu Ini
Realisasi Pengerukan Minggu Ini Sisa luasan 5,466.11
pengerukan hari
Volume Material yg Didapat Minggu Ini (V) : 9,975.00 M3 sisa kubikasi - 24,575.90 420.00 m3/jam
ini
pengerukan
Konversi Luasan yg Didapat (L) : 4,450.00 M2 3.00 jam 140.00 m3/jam
eff
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 117 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m 348
lebar : 50 m 344 4

Tanggal
24-Aug-19 25-Aug-19 26-Aug-19 27-Aug-19 28-Aug-19 29-Aug-19 30-Aug-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track b b b b b b b
3 Mulai Pengerukan di STA. 127.00 127.00 145.00 145.00 145.00 145.00 145.00
4 Selesai Pengerukan di STA. 145.00 145.00 145.00 145.00 145.00 145.00 145.00
5 Panjang Hasil Pengerukan 18.00 18.00 - - - - - 36.00 36.00

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 8 10 5 35 0 0 0 0 0 0 0 0 0 0 13.00 45.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 8.17 5.58 0.00 0.00 0.00 0.00 0.00 13.75 - 6.88 12.00
1.00 1.00 0.00 0.00 0.00 0.00 0.00 2.00

C. Kedalaman Pengerukan 57%


1 Rata - Rata Level Eksisting (m) - 10.50 - 12.00 - - - - -
2 Rata - Rata Level Dikeruk (m) - 12.00 - 13.00 - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) 1.50 1.00 - - - - - 2.50 0.63

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 18.00 18.00 - - - - - 36.00 5.14
3 Ketebalan Area yg Dikeruk (m) 1.50 1.00 - - - - - 2.50 0.36
4 Volume Material yg Dihasilkan (m3) 1,350.00 900.00 - - - - - 2,250.00 321.43 3,000.00
11%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 900.00 900.00 - - - - - 1,800.00 257.14

6 Konversi Luasan (Mencapai Target - - - - - - - - -


-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 110.20 161.19 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 163.64 300.00
produktivitas Per Jam kalender (m3 / jam) 0.11 0.07 - - - - - 55%

akumulasi 6,210.00 7,110.00 11,310.00 900.00 5.58 161.19 - 40,000.00

40,000.00
40,000.00
38,650.00
Realisasi Progres Pengerukan Area A sd Minggu ke 117

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 116 Minggu Ke - 117 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 74,923.00 66,912.57 55.09% 2,250.00 1,800.00 1.48% 77,173.00 68,712.57 56.57%
KUMULATIF TERHADAP KONTRAK 67,158.71 56.57%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 193,146.44 72.14% 1,800.00 0.67% 194,946.44 72.81%

A. Target Pengerukan Termijn 6 45,590.00


Volume 533,081.28 M3 987.4281955 luas 99000 23,122.57
Luasan 121,470.39 M2 19,790.00 awal
luas a sampai tgl
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 23,840.00 akhir
12 april
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

volume a sampai
18056
tgl 12 april

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari sisa pengerukan baty
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 10,208.00 5,408.00
Sisa Durasi : 20.00 hari 2,678.00
Volume Didapat : 50,347.10 m3 878.00
Luasan Didapat : 31,956.11 m2
area B 52,422.00 m3
B. Realisasi Minggu Ini sisa kubikasi 27,578.00
Realisasi Pengerukan Minggu Ini sisa hari 30.64
Volume Material yg Didapat Minggu Ini (V) : 2,250.00 M3
Konversi Luasan yg Didapat (L) : 1,800.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 118 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m 348
lebar : 50 m 344 4

Tanggal
31-Aug-19 01-Sep-19 02-Sep-19 03-Sep-19 04-Sep-19 05-Sep-19 06-Sep-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track b b b b b b b
3 Mulai Pengerukan di STA. 145.00 145.00 138.00 144.00 98.00 105.00 98.00
4 Selesai Pengerukan di STA. 145.00 163.00 144.00 144.00 105.00 112.00 105.00
5 Panjang Hasil Pengerukan - 18.00 6.00 - 7.00 7.00 7.00 45.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 11 5 7 55 0 0 9 5 14 50 10 0 51.00 115.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 11.08 7.92 0.00 9.08 14.83 10.00 52.92 - 10.58 12.00
0.00 1.00 1.00 0.00 1.00 1.00 1.00 5.00

C. Kedalaman Pengerukan 88%


1 Rata - Rata Level Eksisting (m) - - 10.00 - 10.00 - - 4.00 - 7.80 - 8.00
2 Rata - Rata Level Dikeruk (m) - - 11.90 - 13.80 - - 9.00 - 9.50 - 11.35
3 Rata - Rata Ketebalan yg Dikeruk (m) - 1.90 3.80 - 5.00 1.70 3.35 15.75 3.94

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - 18.00 6.00 - 7.00 7.00 7.00 45.00 6.43
3 Ketebalan Area yg Dikeruk (m) - 1.90 3.80 - 5.00 1.70 3.35 15.75 2.25
4 Volume Material yg Dihasilkan (m3) - 1,710.00 1,140.00 - 1,750.00 595.00 1,172.50 6,367.50 909.64 3,000.00
30%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - 900.00 300.00 - 350.00 350.00 350.00 2,250.00 321.43

6 Konversi Luasan (Mencapai Target - - - - - - - - -


-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! 81.20 37.89 #DIV/0! 38.53 23.60 35.00 120.33 300.00
produktivitas Per Jam kalender (m3 / jam) - 0.14 0.27 - 0.36 0.12 0.24 40%

akumulasi 6,210.00 7,920.00 13,060.00 1172.50 10.00 117.25 595.00 40,000.00

39,405.00
38,232.50
38,232.50
Realisasi Progres Pengerukan Area A sd Minggu ke 118

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 117 Minggu Ke - 118 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 77,173.00 68,712.57 56.57% 6,367.50 2,250.00 1.85% 83,540.50 70,962.57 58.42%
KUMULATIF TERHADAP KONTRAK 69,357.83 58.42%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 194,946.44 72.81% 2,250.00 0.84% 197,196.44 73.65%

A. Target Pengerukan Termijn 6 47,840.00


Volume 533,081.28 M3 2794.421793 luas 99000 23,122.57
Luasan 121,470.39 M2 19,790.00 awal
luas a sampai tgl
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 24,290.00 akhir
12 april
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

volume a sampai
18056
tgl 12 april

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari sisa pengerukan baty
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 10,208.00 5,408.00
Sisa Durasi : 20.00 hari 2,678.00
Volume Didapat : 50,347.10 m3 878.00
Luasan Didapat : 31,956.11 m2
area B 58,789.50 m3
B. Realisasi Minggu Ini sisa kubikasi 21,210.50
Realisasi Pengerukan Minggu Ini sisa hari 18.09
Volume Material yg Didapat Minggu Ini (V) : 6,367.50 M3
Konversi Luasan yg Didapat (L) : 2,250.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 118 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m 348
lebar : 50 m 344 4

Tanggal
07-Sep-19 08-Sep-19 09-Sep-19 10-Sep-19 11-Sep-19 12-Sep-19 13-Sep-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track b b b b b b b
3 Mulai Pengerukan di STA. 105.00 80.00 95.00 110.00 95.00 105.00 117.00
4 Selesai Pengerukan di STA. 112.00 95.00 105.00 120.00 105.00 117.00 135.00
5 Panjang Hasil Pengerukan 7.00 15.00 10.00 10.00 10.00 12.00 18.00 82.00 82.00

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 13 35 14 20 16 25 15 55 15 55 14 35 7 40 94.00 265.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 13.58 14.33 16.42 15.92 15.92 14.58 7.67 98.42 1.00 14.06 12.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 7.00

C. Kedalaman Pengerukan 117%


1 Rata - Rata Level Eksisting (m) - 7.50 - 8.00 - 8.00 - 8.00 - 7.00 - 8.00 - 8.50
2 Rata - Rata Level Dikeruk (m) - 10.70 - 12.00 - 12.00 - 12.00 - 11.50 - 11.00 - 11.00
3 Rata - Rata Ketebalan yg Dikeruk (m) 3.20 4.00 4.00 4.00 4.50 3.00 2.50 25.20 4.20

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 7.00 15.00 10.00 10.00 10.00 12.00 18.00 82.00 11.71
3 Ketebalan Area yg Dikeruk (m) 3.20 4.00 4.00 4.00 4.50 3.00 2.50 25.20 3.60
4 Volume Material yg Dihasilkan (m3) 1,120.00 3,000.00 2,000.00 2,000.00 2,250.00 1,800.00 2,250.00 14,420.00 2,060.00 3,000.00
69%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 350.00 750.00 500.00 500.00 500.00 600.00 900.00 4,100.00 585.71

6 Konversi Luasan (Mencapai Target - - - - - - - - -


-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 25.77 52.33 30.46 31.41 31.41 41.14 117.39 146.52 300.00
produktivitas Per Jam kalender (m3 / jam) 0.23 0.29 0.29 0.29 0.32 0.21 0.18 49%

akumulasi 6,210.00 9,210.00 12,430.00 2250.00 15.92 141.36 ### 40,000.00

38,200.00
35,950.00
34,830.00
Realisasi Progres Pengerukan Area A sd Minggu ke 119

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 118 Minggu Ke - 119 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 83,540.50 70,962.57 58.42% 14,420.00 4,100.00 3.38% 97,960.50 75,062.57 61.79%
KUMULATIF TERHADAP KONTRAK 73,365.11 61.79%
2
2 Area Dredging - 2 146,276.53 M 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 197,196.44 73.65% 4,100.00 1.53% 201,296.44 75.18%

22,321.74
A. Target Pengerukan Termijn 6 51,940.00
Volume 533,081.28 M3 6328.31759 luas 99000 23,122.57
Luasan 121,470.39 M2 19,790.00 awal
luas a sampai tgl
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 26,140.00 akhir
12 april
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 46,407.82 38%

volume a sampai
18056
tgl 12 april

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari sisa pengerukan baty
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 10,208.00 5,408.00
Sisa Durasi : 20.00 hari target 2,678.00
Volume Didapat : 50,347.10 m3 pengerukan utk 878.00
Luasan Didapat : 31,956.11 m2 80000 63,240.00 65,490.00
area B 73,209.50 m3 16682
B. Realisasi Minggu Ini sisa kubikasi 6,790.50 85341
Realisasi Pengerukan Minggu Ini sisa hari 3.77 158,556.50 302,756.50 36129
Volume Material yg Didapat Minggu Ini (V) : 14,420.00 M3 9,969.50 374,524.78 397,324.78
Konversi Luasan yg Didapat (L) : 4,100.00 M2 target 80000
sisa kubikasi 16,760.00 14,510.00 14,510.00
6.4488888888889
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 120 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m 348
lebar : 50 m 344 4

Tanggal
14-Sep-19 15-Sep-19 16-Sep-19 17-Sep-19 18-Sep-19 19-Sep-19 20-Sep-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track b b b b b b b
3 Mulai Pengerukan di STA. 116.00 119.00 126.00 133.00 143.00 134.00 138.00
4 Selesai Pengerukan di STA. 123.00 126.00 133.00 143.00 150.00 138.00 146.00
5 Panjang Hasil Pengerukan 7.00 7.00 7.00 10.00 7.00 4.00 8.00 50.00 50.00

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 9 45 9 10 11 35 15 50 15 30 14 35 11 20 84.00 225.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 9.75 9.17 11.58 15.83 15.50 14.58 11.33 87.75 1.00 12.54 12.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 7.00

C. Kedalaman Pengerukan 104%


1 Rata - Rata Level Eksisting (m) - 7.00 - 8.00 - 8.00 - 9.00 - 6.00 - 3.00 - 8.00
2 Rata - Rata Level Dikeruk (m) - 10.00 - 11.00 - 12.00 - 12.50 - 11.00 - 11.00 - 12.00
3 Rata - Rata Ketebalan yg Dikeruk (m) 3.00 3.00 4.00 3.50 5.00 8.00 4.00 30.50 5.08

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 7.00 7.00 7.00 10.00 7.00 4.00 8.00 50.00 7.14
3 Ketebalan Area yg Dikeruk (m) 3.00 3.00 4.00 3.50 5.00 8.00 4.00 30.50 4.36
4 Volume Material yg Dihasilkan (m3) 1,050.00 1,050.00 1,400.00 1,750.00 1,750.00 1,600.00 1,600.00 10,200.00 1,457.14 3,000.00
49%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 350.00 350.00 350.00 500.00 350.00 200.00 400.00 2,500.00 357.14

6 Konversi Luasan (Mencapai Target - - - - - - - - -


-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 35.90 38.18 30.22 31.58 22.58 13.71 35.29 116.24 300.00
produktivitas Per Jam kalender (m3 / jam) 0.21 0.21 0.29 0.25 0.36 0.57 0.29 39%

akumulasi 6,210.00 7,260.00 12,360.00 1600.00 11.33 141.18 ### 40,000.00

38,400.00
36,800.00
35,750.00
Realisasi Progres Pengerukan Area A sd Minggu ke 120

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 119 Minggu Ke - 120 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 97,960.50 75,062.57 61.79% 10,200.00 2,500.00 2.06% 108,160.50 77,562.57 63.85%
KUMULATIF TERHADAP KONTRAK 75,808.58 63.85%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 201,296.44 75.18% 2,500.00 0.93% 203,796.44 76.12%

24,645.96
A. Target Pengerukan Termijn 6 54,440.00
Volume 533,081.28 M3 4476.341153 luas 99000 23,122.57
Luasan 121,470.39 M2 19,790.00 awal
luas a sampai tgl
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 24,540.00 akhir
12 april
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 43,907.82 36%

volume a sampai 18056


tgl 12 april

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari sisa pengerukan baty
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 10,208.00 5,408.00
Sisa Durasi : 20.00 hari target 2,678.00
Volume Didapat : 50,347.10 m3 pengerukan utk 878.00
Luasan Didapat : 31,956.11 m2 80000 63,240.00 75,690.00
area B 83,409.50 m3 19006
B. Realisasi Minggu Ini sisa kubikasi - 3,409.50 83017
Realisasi Pengerukan Minggu Ini sisa hari - 1.89 168,756.50 312,956.50 38454
Volume Material yg Didapat Minggu Ini (V) : 10,200.00 M3 20,169.50 364,324.78 387,124.78
Konversi Luasan yg Didapat (L) : 2,500.00 M2 target 80000
sisa kubikasi 16,760.00 4,310.00
2.69375
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 120 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m 348
lebar : 50 m 344 4

Tanggal
21-Sep-19 22-Sep-19 23-Sep-19 24-Sep-19 25-Sep-19 26-Sep-19 27-Sep-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track b b b b b b b
3 Mulai Pengerukan di STA. 117.00 123.00 127.00 131.00 137.00 139.00 139.00
4 Selesai Pengerukan di STA. 123.00 127.00 131.00 137.00 139.00 139.00 141.00
5 Panjang Hasil Pengerukan 6.00 4.00 4.00 6.00 2.00 - 2.00 24.00 24.00

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 15 35 13 30 9 55 11 40 4 20 0 0 7 55 59.00 235.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 15.58 13.50 9.92 11.67 4.33 0.00 7.92 62.92 1.00 10.49 12.00
1.00 1.00 1.00 1.00 1.00 0.00 1.00 6.00

C. Kedalaman Pengerukan 87%


1 Rata - Rata Level Eksisting (m) - 6.00 - 5.00 - 5.00 - 5.00 - 8.00 - - 8.00
2 Rata - Rata Level Dikeruk (m) - 11.00 - 10.00 - 10.50 - 10.00 - 10.60 - - 12.50
3 Rata - Rata Ketebalan yg Dikeruk (m) 5.00 5.00 5.50 5.00 2.60 - 4.50 27.60 4.60

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 6.00 4.00 4.00 6.00 2.00 - 2.00 24.00 3.43
3 Ketebalan Area yg Dikeruk (m) 5.00 5.00 5.50 5.00 2.60 - 4.50 27.60 3.94
4 Volume Material yg Dihasilkan (m3) 1,500.00 1,000.00 1,100.00 1,500.00 260.00 - 450.00 5,810.00 830.00 3,000.00
28%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 300.00 200.00 200.00 300.00 100.00 - 100.00 1,200.00 171.43
Konversi Luasan (Mencapai Target
6 - - - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 19.25 14.81 20.17 25.71 23.08 #DIV/0! 12.63 92.34 300.00
produktivitas Per Jam kalender (m3 / jam) 0.36 0.36 0.39 0.36 0.19 - 0.32 31%

akumulasi 6,210.00 7,210.00 12,810.00 450.00 7.92 56.84 - 40,000.00

40,000.00
39,550.00
38,050.00
Realisasi Progres Pengerukan Area A sd Minggu ke 121

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 120 Minggu Ke - 121 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 108,160.50 77,562.57 63.85% 5,810.00 1,200.00 0.99% 113,970.50 78,762.57 64.84%
KUMULATIF TERHADAP KONTRAK 76,981.44 64.84%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 203,796.44 76.12% 1,200.00 0.45% 204,996.44 76.56%

25,969.85
A. Target Pengerukan Termijn 6 kubikasi tercapai 710.00
Volume 533,081.28 M3 2549.759029 kubikasi 33000 1,500.00
Luasan 121,470.39 M2 sisa 31,500.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 estimasi 70.00
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 42,707.82 35%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari sisa pengerukan baty
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 10,208.00 5,408.00
Sisa Durasi : 20.00 hari target 2,678.00
Volume Didapat : 50,347.10 m3 pengerukan utk 878.00
Luasan Didapat : 31,956.11 m2 80000 63,240.00 81,500.00
area B 89,219.50 m3 20330
B. Realisasi Minggu Ini sisa kubikasi - 9,219.50 81693
Realisasi Pengerukan Minggu Ini sisa hari - 5.12 174,566.50 318,766.50 39778
Volume Material yg Didapat Minggu Ini (V) : 5,810.00 M3 25,979.50 358,514.78 381,314.78
Konversi Luasan yg Didapat (L) : 1,200.00 M2 target 80000
sisa kubikasi 16,760.00 - 1,500.00
-1.5
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 122 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m 348
lebar : 50 m 344 4

Tanggal
28-Sep-19 29-Sep-19 30-Sep-19 01-Oct-19 02-Oct-19 03-Oct-19 04-Oct-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track b b b b b b b
3 Mulai Pengerukan di STA. 117.00 123.00 131.00 141.00 148.00 160.00 170.00
4 Selesai Pengerukan di STA. 123.00 131.00 141.00 148.00 160.00 170.00 176.00
5 Panjang Hasil Pengerukan 6.00 8.00 10.00 7.00 12.00 10.00 6.00 59.00 59.00

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 14 10 15 30 17 10 14 35 12 40 14 40 14 40 100.00 205.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 14.17 15.50 17.17 14.58 12.67 14.67 14.67 103.42 1.00 14.77 12.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 7.00

C. Kedalaman Pengerukan 123%


1 Rata - Rata Level Eksisting (m) - 8.00 - 8.00 - 8.00 - 4.00 - 8.00 - 5.00 - 5.00
2 Rata - Rata Level Dikeruk (m) - 11.50 - 12.00 - 12.00 - 10.00 - 11.00 - 10.30 - 9.50
3 Rata - Rata Ketebalan yg Dikeruk (m) 3.50 4.00 4.00 6.00 3.00 5.30 4.50 30.30 5.05

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 6.00 8.00 10.00 7.00 12.00 10.00 6.00 59.00 8.43
3 Ketebalan Area yg Dikeruk (m) 3.50 4.00 4.00 6.00 3.00 5.30 4.50 30.30 4.33
4 Volume Material yg Dihasilkan (m3) 1,050.00 1,600.00 2,000.00 2,100.00 1,800.00 2,650.00 1,350.00 12,550.00 1,792.86 3,000.00
60%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 300.00 400.00 500.00 350.00 600.00 500.00 300.00 2,950.00 421.43
Konversi Luasan (Mencapai Target
6 - - - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 21.18 25.81 29.13 24.00 47.37 34.09 20.45 121.35 300.00
produktivitas Per Jam kalender (m3 / jam) 0.25 0.29 0.29 0.43 0.21 0.38 0.32 40%

akumulasi 6,210.00 7,810.00 12,360.00 1350.00 14.67 92.05 ### 40,000.00

37,350.00
36,000.00
34,950.00
Realisasi Progres Pengerukan Area A sd Minggu ke 122

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 121 Minggu Ke - 122 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 113,970.50 78,762.57 64.84% 12,550.00 2,950.00 2.43% 126,520.50 81,712.57 67.27%
KUMULATIF TERHADAP KONTRAK 79,864.73 67.27%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 204,996.44 76.56% 2,950.00 1.10% 207,946.44 77.67%

28,829.55
A. Target Pengerukan Termijn 6 kubikasi tercapai 13,260.00
Volume 533,081.28 M3 5507.655046 kubikasi 33000 14,050.00
Luasan 121,470.39 M2 sisa 18,950.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 estimasi 14.04
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 39,757.82 33% 4,318.04

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari sisa pengerukan baty
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 10,208.00 5,408.00
Sisa Durasi : 20.00 hari target 2,678.00
Volume Didapat : 50,347.10 m3 pengerukan utk 878.00
Luasan Didapat : 31,956.11 m2 80000 63,240.00 88,240.00
area B 101,769.50 m3 23190
B. Realisasi Minggu Ini sisa kubikasi - 21,769.50 78833
Realisasi Pengerukan Minggu Ini sisa hari - 12.09 187,116.50 331,316.50 42637
Volume Material yg Didapat Minggu Ini (V) : 12,550.00 M3 38,529.50 345,964.78 368,764.78
Konversi Luasan yg Didapat (L) : 2,950.00 M2 target 80000
sisa kubikasi 16,760.00 - 8,240.00
-8.24
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 123 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m 348
lebar : 50 m 344 4

Tanggal
05-Oct-19 06-Oct-19 07-Oct-19 08-Oct-19 09-Oct-19 10-Oct-19 11-Oct-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track b b b b b b b
3 Mulai Pengerukan di STA. 176.00 182.00 188.00 196.00 204.00 204.00 204.00
4 Selesai Pengerukan di STA. 182.00 188.00 196.00 204.00 204.00 204.00 210.00
5 Panjang Hasil Pengerukan 6.00 6.00 8.00 8.00 - - 6.00 34.00 34.00

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 12 45 9 50 10 10 14 55 0 0 0 0 10 50 55.00 210.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 12.75 9.83 10.17 14.92 0.00 0.00 10.83 58.50 - 11.70 12.00
1.00 1.00 1.00 1.00 0.00 0.00 1.00 5.00

C. Kedalaman Pengerukan 98%


1 Rata - Rata Level Eksisting (m) - 4.00 - 4.00 - 6.00 - 6.00 - - - 5.00
2 Rata - Rata Level Dikeruk (m) - 10.00 - 8.00 - 9.30 - 11.50 - - - 9.50
3 Rata - Rata Ketebalan yg Dikeruk (m) 6.00 4.00 3.30 5.50 - - 4.50 23.30 3.88

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 6.00 6.00 8.00 8.00 - - 6.00 34.00 4.86
3 Ketebalan Area yg Dikeruk (m) 6.00 4.00 3.30 5.50 - - 4.50 23.30 3.33
4 Volume Material yg Dihasilkan (m3) 1,800.00 1,200.00 1,320.00 2,200.00 - - 1,350.00 7,870.00 1,124.29 3,000.00
37%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 300.00 300.00 400.00 400.00 - - 300.00 1,700.00 242.86
Konversi Luasan (Mencapai Target
6 - - - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 23.53 30.51 39.34 26.82 #DIV/0! #DIV/0! 27.69 134.53 300.00
produktivitas Per Jam kalender (m3 / jam) 0.43 0.29 0.24 0.39 - - 0.32 45%

akumulasi 6,210.00 7,410.00 13,110.00 1350.00 10.83 124.62 - 40,000.00

40,000.00
38,650.00
36,850.00
Realisasi Progres Pengerukan Area A sd Minggu ke 123

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 122 Minggu Ke - 123 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 126,520.50 81,712.57 67.27% 7,870.00 1,700.00 1.40% 134,390.50 83,412.57 68.67%
KUMULATIF TERHADAP KONTRAK 81,526.29 68.67%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 207,946.44 77.67% 1,700.00 0.63% 209,646.44 78.30%

30,622.85
A. Target Pengerukan Termijn 6 kubikasi tercapai 21,130.00
Volume 533,081.28 M3 3453.804399 kubikasi 33000 21,920.00
Luasan 121,470.39 M2 sisa 11,080.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 estimasi 8.21
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 38,057.82 31% 2,524.74

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari sisa pengerukan baty
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 10,208.00 5,408.00
Sisa Durasi : 20.00 hari target 2,678.00
Volume Didapat : 50,347.10 m3 pengerukan utk 878.00
Luasan Didapat : 31,956.11 m2 80000 63,240.00 83,560.00
area B 109,639.50 m3 24983
B. Realisasi Minggu Ini sisa kubikasi - 29,639.50 77040
Realisasi Pengerukan Minggu Ini sisa hari - 16.47 194,986.50 339,186.50 44431
Volume Material yg Didapat Minggu Ini (V) : 7,870.00 M3 46,399.50 338,094.78 360,894.78
Konversi Luasan yg Didapat (L) : 1,700.00 M2 target 80000
sisa kubikasi 16,760.00 - 3,560.00
-3.56
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 124 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m 348
lebar : 50 m 344 4

Tanggal
12-Oct-19 13-Oct-19 14-Oct-19 15-Oct-19 16-Oct-19 17-Oct-19 18-Oct-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track b b b b b b b
3 Mulai Pengerukan di STA. 210.00 214.00 222.00 226.00 226.00 232.00 238.00
4 Selesai Pengerukan di STA. 214.00 222.00 226.00 226.00 232.00 238.00 248.00
5 Panjang Hasil Pengerukan 4.00 8.00 4.00 - 6.00 6.00 10.00 38.00 38.00

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 7 35 17 43 6 55 0 0 3 0 14 45 14 55 61.00 233.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 7.58 17.72 6.92 0.00 3.00 14.75 14.92 64.88 1.00 10.81 12.00
1.00 1.00 1.00 0.00 1.00 1.00 1.00 6.00

C. Kedalaman Pengerukan 90%


1 Rata - Rata Level Eksisting (m) - 4.00 - 5.90 - 7.00 - - 8.50 - 7.00 - 7.00
2 Rata - Rata Level Dikeruk (m) - 11.00 - 11.00 - 11.00 - - 10.20 - 13.00 - 12.00
3 Rata - Rata Ketebalan yg Dikeruk (m) 7.00 5.10 4.00 - 1.70 6.00 5.00 28.80 4.80

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 4.00 8.00 4.00 - 6.00 6.00 10.00 38.00 5.43
3 Ketebalan Area yg Dikeruk (m) 7.00 5.10 4.00 - 1.70 6.00 5.00 28.80 4.11
4 Volume Material yg Dihasilkan (m3) 1,400.00 2,040.00 800.00 - 510.00 1,800.00 2,500.00 9,050.00 1,292.86 3,000.00
43%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 200.00 400.00 200.00 - 300.00 300.00 500.00 1,900.00 271.43
Konversi Luasan (Mencapai Target
6 - - - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 26.37 22.58 28.92 #DIV/0! 100.00 20.34 33.52 139.48 300.00
produktivitas Per Jam kalender (m3 / jam) 0.50 0.36 0.29 - 0.12 0.43 0.36 46%

akumulasi 6,210.00 8,250.00 12,710.00 2500.00 14.92 167.60 ### 40,000.00

38,200.00
35,700.00
34,300.00
Realisasi Progres Pengerukan Area A sd Minggu ke 124

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 123 Minggu Ke - 124 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 134,390.50 83,412.57 68.67% 9,050.00 1,900.00 1.56% 143,440.50 85,312.57 70.23%
KUMULATIF TERHADAP KONTRAK 83,383.32 70.23%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 209,646.44 78.30% 1,900.00 0.71% 211,546.44 79.01%

32,685.02
A. Target Pengerukan Termijn 6 kubikasi tercapai 30,180.00
Volume 533,081.28 M3 3971.655631 kubikasi 33000 30,970.00
Luasan 121,470.39 M2 sisa 2,030.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 estimasi 0.81
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 36,157.82 30% 462.57

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari sisa pengerukan baty
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 10,208.00 5,408.00
Sisa Durasi : 20.00 hari target 2,678.00
Volume Didapat : 50,347.10 m3 pengerukan utk 878.00
Luasan Didapat : 31,956.11 m2 80000 63,240.00 84,740.00
area B 118,689.50 m3 27045
B. Realisasi Minggu Ini sisa kubikasi - 38,689.50 74978
Realisasi Pengerukan Minggu Ini sisa hari - 21.49 204,036.50 348,236.50 46493
Volume Material yg Didapat Minggu Ini (V) : 9,050.00 M3 55,449.50 329,044.78 351,844.78
Konversi Luasan yg Didapat (L) : 1,900.00 M2 target 80000
sisa kubikasi 16,760.00 - 4,740.00
-4.74
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 125 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m 348
lebar : 50 m 344 4

Tanggal
19-Oct-19 20-Oct-19 21-Oct-19 22-Oct-19 23-Oct-19 24-Oct-19 25-Oct-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c c c c
3 Mulai Pengerukan di STA. 248.00 254.00 260.00 266.00 272.00 124.00 132.00
4 Selesai Pengerukan di STA. 254.00 260.00 266.00 272.00 280.00 132.00 139.00
5 Panjang Hasil Pengerukan 6.00 6.00 6.00 6.00 8.00 8.00 7.00 47.00 47.00

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 15 0 11 10 8 0 11 0 16 0 13 40 14 0 88.00 50.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 15.00 11.17 8.00 11.00 16.00 13.67 14.00 88.83 1.00 12.69 12.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 7.00

C. Kedalaman Pengerukan 106%


1 Rata - Rata Level Eksisting (m) - 8.00 - 7.00 - 8.00 - 5.00 - 5.00 - 6.50 - 5.80
2 Rata - Rata Level Dikeruk (m) - 12.00 - 12.00 - 12.00 - 10.00 - 10.50 - 11.00 - 11.00
3 Rata - Rata Ketebalan yg Dikeruk (m) 4.00 5.00 4.00 5.00 5.50 4.50 5.20 33.20 5.53

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 6.00 6.00 6.00 6.00 8.00 8.00 7.00 47.00 6.71
3 Ketebalan Area yg Dikeruk (m) 4.00 5.00 4.00 5.00 5.50 4.50 5.20 33.20 4.74
4 Volume Material yg Dihasilkan (m3) 1,200.00 1,500.00 1,200.00 1,500.00 2,200.00 1,800.00 1,820.00 11,220.00 1,602.86 3,000.00
53%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 300.00 300.00 300.00 300.00 400.00 400.00 350.00 2,350.00 335.71
Konversi Luasan (Mencapai Target
6 - - - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 20.00 26.87 37.50 27.27 25.00 29.27 25.00 126.30 300.00
produktivitas Per Jam kalender (m3 / jam) 0.29 0.36 0.29 0.36 0.39 0.32 0.37 42%

1820.00 14.00 130.00 ### 40,000.00

38,200.00
36,380.00
35,180.00
Realisasi Progres Pengerukan Area A sd Minggu ke 125

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 124 Minggu Ke - 125 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 143,440.50 85,312.57 70.23% 11,220.00 2,350.00 1.93% 154,660.50 87,662.57 72.17%
KUMULATIF TERHADAP KONTRAK 85,680.18 72.17%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 211,546.44 79.01% 2,350.00 0.88% 213,896.44 79.89%

35,241.66
A. Target Pengerukan Termijn 6 kubikasi tercapai 41,400.00
Volume 533,081.28 M3 4923.975268 kubikasi 33000 42,190.00
Luasan 121,470.39 M2 sisa - 9,190.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 estimasi - 7.66
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 33,807.82 28% - 2,094.08

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari sisa pengerukan baty
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 10,208.00 5,408.00
Sisa Durasi : 20.00 hari target 2,678.00
Volume Didapat : 50,347.10 m3 pengerukan utk 878.00
Luasan Didapat : 31,956.11 m2 80000 63,240.00 84,740.00
area B 129,909.50 m3 29602
B. Realisasi Minggu Ini sisa kubikasi - 49,909.50 72421
Realisasi Pengerukan Minggu Ini sisa hari - 27.73 215,256.50 359,456.50 49049
Volume Material yg Didapat Minggu Ini (V) : 11,220.00 M3 66,669.50 317,824.78 340,624.78
Konversi Luasan yg Didapat (L) : 2,350.00 M2 target 80000
sisa kubikasi 16,760.00 - 6,910.00
-6.91
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 126 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m 348
lebar : 50 m 344 4

Tanggal
26-Oct-19 27-Oct-19 28-Oct-19 29-Oct-19 30-Oct-19 31-Oct-19 01-Nov-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c c c c
3 Mulai Pengerukan di STA. 144.00 150.00 158.00 166.00 173.00
4 Selesai Pengerukan di STA. 150.00 158.00 166.00 173.00 179.00
5 Panjang Hasil Pengerukan 6.00 8.00 8.00 7.00 6.00 35.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 13 55 10 0 11 35 10 20 9 30 53.00 140.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 13.92 10.00 11.58 10.33 9.50 55.33 - 11.07 12.00
1.00 1.00 1.00 1.00 1.00 5.00

C. Kedalaman Pengerukan 92%


1 Rata - Rata Level Eksisting (m) - 7.00 - 8.00 - 8.00 - 9.00 - 9.00
2 Rata - Rata Level Dikeruk (m) - 11.80 - 12.40 - 12.50 - 12.00 - 12.00
3 Rata - Rata Ketebalan yg Dikeruk (m) 4.80 4.40 4.50 3.00 3.00 Proses docking 19.70 3.28

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 6.00 8.00 8.00 7.00 6.00 35.00 5.00
3 Ketebalan Area yg Dikeruk (m) 4.80 4.40 4.50 3.00 3.00 19.70 2.81
4 Volume Material yg Dihasilkan (m3) 1,440.00 1,760.00 1,800.00 1,050.00 900.00 6,950.00 992.86 3,000.00
33%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 300.00 400.00 400.00 350.00 300.00 1,750.00 250.00
Konversi Luasan (Mencapai Target
6 - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 21.56 40.00 34.53 33.87 31.58 125.60 300.00
produktivitas Per Jam kalender (m3 / jam) 0.34 0.31 0.32 0.21 0.21 42%

900.00 9.50 94.74 - 40,000.00

40,000.00
40,000.00
38,560.00
Realisasi Progres Pengerukan Area A sd Minggu ke 126

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 125 Minggu Ke - 126 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 154,660.50 87,662.57 72.17% 6,950.00 1,750.00 1.44% 161,610.50 89,412.57 73.61%
KUMULATIF TERHADAP KONTRAK 87,390.60 73.61%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 213,896.44 79.89% 1,750.00 0.65% 215,646.44 80.54%

36,825.32
A. Target Pengerukan Termijn 6 kubikasi tercapai 37,130.00
Volume 533,081.28 M3 3050.0559815442 kubikasi 33000 37,920.00
Luasan 121,470.39 M2 sisa - 4,920.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 estimasi - 4.10
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 32,057.82 26% - 1,121.09

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari sisa pengerukan baty
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 10,208.00 5,408.00
Sisa Durasi : 20.00 hari target 2,678.00
Volume Didapat : 50,347.10 m3 pengerukan utk 878.00
Luasan Didapat : 31,956.11 m2 80000 63,240.00 84,740.00
area B 136,859.50 m3 31185
B. Realisasi Minggu Ini sisa kubikasi - 56,859.50 70837
Realisasi Pengerukan Minggu Ini sisa hari - 31.59 222,206.50 366,406.50 50633
Volume Material yg Didapat Minggu Ini (V) : 6,950.00 M3 73,619.50 310,874.78 333,674.78
Konversi Luasan yg Didapat (L) : 1,750.00 M2 target 80000
sisa kubikasi 16,760.00 - 2,640.00
-2.64
Realisasi Progres Pengerukan Area A sd Minggu ke 126

Progres Realisasi (Tagihan ke-10)


Kontrak Luasan termin 8 termin 10 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 31,168.50 50,662.57 41.71% 81,226.00 18,502.51 15.23% 112,394.50 69,165.08 56.94%
KUMULATIF TERHADAP KONTRAK 67,600.99 56.94%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 176,896.44 66.07% 18,502.51 6.91% 195,398.95 72.96%

A. Target Pengerukan Termijn 6 kubikasi tercapai 37,130.00


Volume 533,081.28 M3 kubikasi 33000 37,920.00
Luasan 121,470.39 M2 sisa - 4,920.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 estimasi - 4.10
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 52,305.31 43% - 1,121.09

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari sisa pengerukan baty
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 10,208.00 5,408.00
Sisa Durasi : 20.00 hari target 2,678.00
Volume Didapat : 50,347.10 m3 pengerukan utk 878.00
Luasan Didapat : 31,956.11 m2 80000 63,240.00 84,740.00
area B 136,859.50 m3 31185
B. Realisasi Minggu Ini sisa kubikasi - 56,859.50 70837
Realisasi Pengerukan Minggu Ini sisa hari - 31.59 222,206.50 366,406.50 50633
Volume Material yg Didapat Minggu Ini (V) : 6,950.00 M3 73,619.50 310,874.78 333,674.78
Konversi Luasan yg Didapat (L) : 1,750.00 M2 target 80000
sisa kubikasi 16,760.00 - 2,640.00
-2.64
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 126 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m 348
lebar : 50 m 344 4

Tanggal
02-Nov-19 03-Nov-19 04-Nov-19 05-Nov-19 06-Nov-19 07-Nov-19 08-Nov-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c c c c
3 Mulai Pengerukan di STA.
4 Selesai Pengerukan di STA.
5 Panjang Hasil Pengerukan - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 - #DIV/0! 12.00
0.00

C. Kedalaman Pengerukan #DIV/0!


1 Rata - Rata Level Eksisting (m)
2 Rata - Rata Level Dikeruk (m)
3 Rata - Rata Ketebalan yg Dikeruk (m) Proses docking - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 42.00 42.00
2 Panjang Area yg Dikeruk (m) - -
3 Ketebalan Area yg Dikeruk (m) - -
4 Volume Material yg Dihasilkan (m3) - - 3,000.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!

0.00 - #DIV/0! - 40,000.00

40,000.00
40,000.00
40,000.00
Realisasi Progres Pengerukan Area A sd Minggu ke 127

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 126 Minggu Ke - 127 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 112,394.50 69,165.08 56.94% - - 0.00% 112,394.50 69,165.08 56.94%
KUMULATIF TERHADAP KONTRAK 67,600.99 56.94%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 195,398.95 72.98% - 0.00% 195,398.95 72.96%

25,610.74
A. Target Pengerukan Termijn 6 kubikasi tercapai 30,180.00
Volume 533,081.28 M3 0 kubikasi 33000 30,970.00
Luasan 121,470.39 M2 sisa 2,030.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 estimasi 1.69
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 52,305.31 43% 462.57

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari sisa pengerukan baty
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 10,208.00 5,408.00
Sisa Durasi : 20.00 hari target 2,678.00
Volume Didapat : 50,347.10 m3 pengerukan utk 878.00
Luasan Didapat : 31,956.11 m2 80000 63,240.00 84,740.00
area B 129,909.50 m3 29602
B. Realisasi Minggu Ini sisa kubikasi - 49,909.50 72421
Realisasi Pengerukan Minggu Ini sisa hari - 27.73 215,256.50 359,456.50 49049
Volume Material yg Didapat Minggu Ini (V) : - M3 66,669.50 317,824.78 340,624.78
Konversi Luasan yg Didapat (L) : - M2 target 80000
sisa kubikasi 16,760.00 4,310.00
4.31
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 128 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m 348
lebar : 50 m 344 4

Tanggal
09-Nov-19 10-Nov-19 11-Nov-19 12-Nov-19 13-Nov-19 14-Nov-19 15-Nov-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c c c c
3 Mulai Pengerukan di STA.
4 Selesai Pengerukan di STA.
5 Panjang Hasil Pengerukan - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 - #DIV/0! 12.00
0.00

C. Kedalaman Pengerukan #DIV/0!


1 Rata - Rata Level Eksisting (m)
2 Rata - Rata Level Dikeruk (m)
3 Rata - Rata Ketebalan yg Dikeruk (m) Proses docking - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 42.00 42.00
2 Panjang Area yg Dikeruk (m) - -
3 Ketebalan Area yg Dikeruk (m) - -
4 Volume Material yg Dihasilkan (m3) - - 3,000.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!

0.00 - #DIV/0! - 40,000.00

40,000.00
40,000.00
40,000.00
Realisasi Progres Pengerukan Area A sd Minggu ke 127

Progres Realisasi (Tagihan ke-7)


Kontrak Luasan Minggu Ke - 126 Minggu Ke - 127 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 112,394.50 69,165.08 56.94% - - 0.00% 112,394.50 69,165.08 56.94%
KUMULATIF TERHADAP KONTRAK 67,600.99 56.94%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 195,398.95 72.98% - 0.00% 195,398.95 72.96%

25,610.74
A. Target Pengerukan Termijn 6 kubikasi tercapai 30,180.00
Volume 533,081.28 M3 0 kubikasi 33000 30,970.00
Luasan 121,470.39 M2 sisa 2,030.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 estimasi 1.69
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 52,305.31 43% 462.57

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari sisa pengerukan baty
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 10,208.00 5,408.00
Sisa Durasi : 20.00 hari target 2,678.00
Volume Didapat : 50,347.10 m3 pengerukan utk 878.00
Luasan Didapat : 31,956.11 m2 80000 63,240.00 84,740.00
area B 129,909.50 m3 29602
B. Realisasi Minggu Ini sisa kubikasi - 49,909.50 72421
Realisasi Pengerukan Minggu Ini sisa hari - 27.73 215,256.50 359,456.50 49049
Volume Material yg Didapat Minggu Ini (V) : - M3 66,669.50 317,824.78 340,624.78
Konversi Luasan yg Didapat (L) : - M2 target 80000
sisa kubikasi 16,760.00 4,310.00
4.31
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 129 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m 348
lebar : 50 m 344 4

Tanggal
16-Nov-19 17-Nov-19 18-Nov-19 19-Nov-19 20-Nov-19 21-Nov-19 22-Nov-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c c c c
3 Mulai Pengerukan di STA.
4 Selesai Pengerukan di STA.
5 Panjang Hasil Pengerukan - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 - #DIV/0! 12.00
0.00

C. Kedalaman Pengerukan #DIV/0!


1 Rata - Rata Level Eksisting (m)
2 Rata - Rata Level Dikeruk (m)
3 Rata - Rata Ketebalan yg Dikeruk (m) Proses docking - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 42.00 42.00
2 Panjang Area yg Dikeruk (m) - -
3 Ketebalan Area yg Dikeruk (m) - -
4 Volume Material yg Dihasilkan (m3) - - 3,000.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!

0.00 - #DIV/0! - 40,000.00

40,000.00
40,000.00
40,000.00
Realisasi Progres Pengerukan Area A sd Minggu ke 129

Progres Realisasi
Kontrak Luasan Minggu Ke - 128 Minggu Ke - 129 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 112,394.50 69,165.08 56.94% - - 0.00% 112,394.50 69,165.08 56.94%
KUMULATIF TERHADAP KONTRAK 67,600.99 56.94%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 195,398.95 72.98% - 0.00% 195,398.95 72.96%

25,610.74
A. Target Pengerukan Termijn 6 kubikasi tercapai 30,180.00
Volume 533,081.28 M3 0 kubikasi 33000 30,970.00
Luasan 121,470.39 M2 sisa 2,030.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 estimasi 1.69
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 52,305.31 43% 462.57

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari sisa pengerukan baty
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 10,208.00 5,408.00
Sisa Durasi : 20.00 hari target 2,678.00
Volume Didapat : 50,347.10 m3 pengerukan utk 878.00
Luasan Didapat : 31,956.11 m2 80000 63,240.00 84,740.00
area B 129,909.50 m3 29602
B. Realisasi Minggu Ini sisa kubikasi - 49,909.50 72421
Realisasi Pengerukan Minggu Ini sisa hari - 27.73 215,256.50 359,456.50 49049
Volume Material yg Didapat Minggu Ini (V) : - M3 66,669.50 317,824.78 340,624.78
Konversi Luasan yg Didapat (L) : - M2 target 80000
sisa kubikasi 16,760.00 4,310.00
4.31
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 130 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m 348
lebar : 50 m 344 4

Tanggal
23-Nov-19 24-Nov-19 25-Nov-19 26-Nov-19 27-Nov-19 28-Nov-19 29-Nov-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c c c c
3 Mulai Pengerukan di STA.
4 Selesai Pengerukan di STA.
5 Panjang Hasil Pengerukan - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 - #DIV/0! 12.00
0.00

C. Kedalaman Pengerukan #DIV/0!


1 Rata - Rata Level Eksisting (m)
2 Rata - Rata Level Dikeruk (m)
3 Rata - Rata Ketebalan yg Dikeruk (m) Proses docking - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 42.00 42.00
2 Panjang Area yg Dikeruk (m) - -
3 Ketebalan Area yg Dikeruk (m) - -
4 Volume Material yg Dihasilkan (m3) - - 3,000.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!

0.00 - #DIV/0! - 40,000.00

40,000.00
40,000.00
40,000.00
Realisasi Progres Pengerukan Area A sd Minggu ke 130

Progres Realisasi
Kontrak Luasan Minggu Ke - 129 Minggu Ke - 130 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 112,394.50 69,165.08 56.94% - - 0.00% 112,394.50 69,165.08 56.94%
KUMULATIF TERHADAP KONTRAK 67,600.99 56.94%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 195,398.95 72.98% - 0.00% 195,398.95 72.96%

25,610.74
A. Target Pengerukan Termijn 6 kubikasi tercapai 30,180.00
Volume 533,081.28 M3 0 kubikasi 33000 30,970.00
Luasan 121,470.39 M2 sisa 2,030.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 estimasi 1.69
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 52,305.31 43% 462.57

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari sisa pengerukan baty
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 10,208.00 5,408.00
Sisa Durasi : 20.00 hari target 2,678.00
Volume Didapat : 50,347.10 m3 pengerukan utk 878.00
Luasan Didapat : 31,956.11 m2 80000 63,240.00 84,740.00
area B 129,909.50 m3 29602
B. Realisasi Minggu Ini sisa kubikasi - 49,909.50 72421
Realisasi Pengerukan Minggu Ini sisa hari - 27.73 215,256.50 359,456.50 49049
Volume Material yg Didapat Minggu Ini (V) : - M3 66,669.50 317,824.78 340,624.78
Konversi Luasan yg Didapat (L) : - M2 target 80000
sisa kubikasi 16,760.00 4,310.00
4.31
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 131 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
30-Nov-19 01-Dec-19 02-Dec-19 03-Dec-19 04-Dec-19 05-Dec-19 06-Dec-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c c c c
3 Mulai Pengerukan di STA.
4 Selesai Pengerukan di STA.
5 Panjang Hasil Pengerukan - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 - #DIV/0! 12.00
0.00

C. Kedalaman Pengerukan #DIV/0!


1 Rata - Rata Level Eksisting (m)
2 Rata - Rata Level Dikeruk (m)
3 Rata - Rata Ketebalan yg Dikeruk (m) Proses docking - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 42.00 42.00
2 Panjang Area yg Dikeruk (m) - -
3 Ketebalan Area yg Dikeruk (m) - -
4 Volume Material yg Dihasilkan (m3) - - 3,000.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!
Realisasi Progres Pengerukan Area A sd Minggu ke 131

Progres Realisasi
Kontrak Luasan Minggu Ke - 130 Minggu Ke - 131 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 112,394.50 69,165.08 56.94% - - 0.00% 112,394.50 69,165.08 56.94%
KUMULATIF TERHADAP KONTRAK 67,600.99 56.94%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 195,398.95 72.98% - 0.00% 195,398.95 72.96%

25,610.74
A. Target Pengerukan Termijn 6 kubikasi tercapai 30,180.00
Volume 533,081.28 M3 0 kubikasi 33000 30,970.00
Luasan 121,470.39 M2 sisa 2,030.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 estimasi 1.69
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 52,305.31 43% 462.57

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari sisa pengerukan baty
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 10,208.00 5,408.00
Sisa Durasi : 20.00 hari target 2,678.00
Volume Didapat : 50,347.10 m3 pengerukan utk 878.00
Luasan Didapat : 31,956.11 m2 80000 63,240.00 84,740.00
area B 129,909.50 m3 29602
B. Realisasi Minggu Ini sisa kubikasi - 49,909.50 72421
Realisasi Pengerukan Minggu Ini sisa hari - 27.73 215,256.50 359,456.50 49049
Volume Material yg Didapat Minggu Ini (V) : - M3 66,669.50 317,824.78 340,624.78
Konversi Luasan yg Didapat (L) : - M2 target 80000
sisa kubikasi 16,760.00 4,310.00
4.31
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 132 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
07-Dec-19 08-Dec-19 09-Dec-19 10-Dec-19 11-Dec-19 12-Dec-19 13-Dec-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c c c c
3 Mulai Pengerukan di STA.
4 Selesai Pengerukan di STA.
5 Panjang Hasil Pengerukan - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 - #DIV/0! 12.00
0.00

C. Kedalaman Pengerukan #DIV/0!


1 Rata - Rata Level Eksisting (m)
2 Rata - Rata Level Dikeruk (m)
3 Rata - Rata Ketebalan yg Dikeruk (m) Proses docking - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 42.00 42.00
2 Panjang Area yg Dikeruk (m) - -
3 Ketebalan Area yg Dikeruk (m) - -
4 Volume Material yg Dihasilkan (m3) - - 3,000.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!
Realisasi Progres Pengerukan Area A sd Minggu ke 132

Progres Realisasi
Kontrak Luasan Minggu Ke - 131 Minggu Ke - 132 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 112,394.50 69,165.08 56.94% - - 0.00% 112,394.50 69,165.08 56.94%
KUMULATIF TERHADAP KONTRAK 67,600.99 56.94%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 195,398.95 72.98% - 0.00% 195,398.95 72.96%

25,610.74
A. Target Pengerukan Termijn 6 kubikasi tercapai 30,180.00
Volume 533,081.28 M3 0 kubikasi 33000 30,970.00
Luasan 121,470.39 M2 sisa 2,030.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 estimasi 1.69
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 52,305.31 43% 462.57

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari sisa pengerukan baty
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 10,208.00 5,408.00
Sisa Durasi : 20.00 hari target 2,678.00
Volume Didapat : 50,347.10 m3 pengerukan utk 878.00
Luasan Didapat : 31,956.11 m2 80000 63,240.00 84,740.00
area B 129,909.50 m3 29602
B. Realisasi Minggu Ini sisa kubikasi - 49,909.50 72421
Realisasi Pengerukan Minggu Ini sisa hari - 27.73 215,256.50 359,456.50 49049
Volume Material yg Didapat Minggu Ini (V) : - M3 66,669.50 317,824.78 340,624.78
Konversi Luasan yg Didapat (L) : - M2 target 80000
sisa kubikasi 16,760.00 4,310.00
4.31
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 133 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
14-Dec-19 15-Dec-19 16-Dec-19 17-Dec-19 18-Dec-19 19-Dec-19 20-Dec-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c c c c
3 Mulai Pengerukan di STA.
4 Selesai Pengerukan di STA.
5 Panjang Hasil Pengerukan - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 - #DIV/0! 12.00
0.00

C. Kedalaman Pengerukan #DIV/0!


1 Rata - Rata Level Eksisting (m)
2 Rata - Rata Level Dikeruk (m)
3 Rata - Rata Ketebalan yg Dikeruk (m) Proses docking - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 42.00 42.00
2 Panjang Area yg Dikeruk (m) - -
3 Ketebalan Area yg Dikeruk (m) - -
4 Volume Material yg Dihasilkan (m3) - - 3,000.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!
Realisasi Progres Pengerukan Area A sd Minggu ke 133

Progres Realisasi
Kontrak Luasan Minggu Ke - 132 Minggu Ke - 133 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 112,394.50 69,165.08 56.94% - - 0.00% 112,394.50 69,165.08 56.94%
KUMULATIF TERHADAP KONTRAK 67,600.99 56.94%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 195,398.95 72.98% - 0.00% 195,398.95 72.96%

25,610.74
A. Target Pengerukan Termijn 6 kubikasi tercapai 30,180.00
Volume 533,081.28 M3 0 kubikasi 33000 30,970.00
Luasan 121,470.39 M2 sisa 2,030.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 estimasi 1.69
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 52,305.31 43% 462.57

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari sisa pengerukan baty
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 10,208.00 5,408.00
Sisa Durasi : 20.00 hari target 2,678.00
Volume Didapat : 50,347.10 m3 pengerukan utk 878.00
Luasan Didapat : 31,956.11 m2 80000 63,240.00 84,740.00
area B 129,909.50 m3 29602
B. Realisasi Minggu Ini sisa kubikasi - 49,909.50 72421
Realisasi Pengerukan Minggu Ini sisa hari - 27.73 215,256.50 359,456.50 49049
Volume Material yg Didapat Minggu Ini (V) : - M3 66,669.50 317,824.78 340,624.78
Konversi Luasan yg Didapat (L) : - M2 target 80000
sisa kubikasi 16,760.00 4,310.00
4.31
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 134 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
21-Dec-19 22-Dec-19 23-Dec-19 24-Dec-19 25-Dec-19 26-Dec-19 27-Dec-19 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan 156.00 19.00


1 Nama Track B B B B
3 Mulai Pengerukan di STA. 137.00 138.00 144.00 146.00
4 Selesai Pengerukan di STA. 138.00 144.00 150.00 154.00
5 Panjang Hasil Pengerukan 1.00 6.00 6.00 8.00 21.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 4 0 8 5 15 55 9 35 36.00 95.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 4.00 8.08 15.92 9.58 37.58 - 9.40 12.00
1.00 1.00 1.00 1.00 4.00

C. Kedalaman Pengerukan 78%


1 Rata - Rata Level Eksisting (m) - 8.00 - 8.00 - 8.00 - 9.00
DOCKING
2 Rata - Rata Level Dikeruk (m) - 10.00 - 11.00 - 12.00 - 12.50
3 Rata - Rata Ketebalan yg Dikeruk (m) 2.00 3.00 4.00 3.50 12.50 2.08

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 1.00 6.00 6.00 8.00 21.00 3.00
3 Ketebalan Area yg Dikeruk (m) 2.00 3.00 4.00 3.50 12.50 1.79
4 Volume Material yg Dihasilkan (m3) 100.00 900.00 1,200.00 1,400.00 3,600.00 514.29 3,000.00
17%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 50.00 300.00 300.00 400.00 1,050.00 150.00
Konversi Luasan (Mencapai Target
6 - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 12.50 37.11 18.85 41.74 95.79 300.00
produktivitas Per Jam kalender (m3 / jam) 0.14 0.21 0.29 0.25 32%

1,400.00 9.58 146.09


Realisasi Progres Pengerukan Area A sd Minggu ke 134

Progres Realisasi
Kontrak Luasan Minggu Ke - 133 Minggu Ke - 134 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 112,394.50 69,165.08 56.94% 3,600.00 1,050.00 0.86% 115,994.50 70,215.08 57.80%
KUMULATIF TERHADAP KONTRAK 68,627.24 57.80%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 195,398.95 72.98% 1,050.00 0.39% 196,448.95 73.37%

26,431.05
A. Target Pengerukan Termijn 6 kubikasi tercapai 33,780.00
Volume 533,081.28 M3 1579.8851127423 kubikasi 33000 34,570.00
Luasan 121,470.39 M2 sisa - 1,570.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 estimasi - 1.31
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 51,255.31 42% - 357.75

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari sisa pengerukan baty
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 10,208.00 5,408.00
Sisa Durasi : 20.00 hari target 2,678.00
Volume Didapat : 50,347.10 m3 pengerukan utk 878.00
Luasan Didapat : 31,956.11 m2 80000 63,240.00 84,740.00
area B 133,509.50 m3 30422
B. Realisasi Minggu Ini sisa kubikasi - 53,509.50 71601
Realisasi Pengerukan Minggu Ini sisa hari - 29.73 218,856.50 363,056.50 49870
Volume Material yg Didapat Minggu Ini (V) : 3,600.00 M3 70,269.50 314,224.78 337,024.78
Konversi Luasan yg Didapat (L) : 1,050.00 M2 target 80000
sisa kubikasi 16,760.00 710.00
0.71
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 135 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
28-Dec-19 29-Dec-19 30-Dec-19 31-Dec-19 01-Jan-20 02-Jan-20 03-Jan-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track B B B B B B B
3 Mulai Pengerukan di STA. 154.00 160.00 166.00 172.00 180.00
4 Selesai Pengerukan di STA. 160.00 166.00 172.00 180.00 184.00
5 Panjang Hasil Pengerukan 6.00 6.00 6.00 8.00 4.00 30.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 6 0 14 10 7 45 13 55 6 45 46.00 155.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 6.00 14.17 7.75 13.92 6.75 48.58 - 6.94 12.00
1.00 1.00 1.00 1.00 1.00 5.00

C. Kedalaman Pengerukan 58%


1 Rata - Rata Level Eksisting (m) - 7.00 - 7.00 - 8.00 - 8.00 - 8.00
2 Rata - Rata Level Dikeruk (m) - 11.00 - 11.00 - 13.55 - 13.55 - 12.00
3 Rata - Rata Ketebalan yg Dikeruk (m) 4.00 4.00 5.55 5.55 4.00 23.10 3.85

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 6.00 6.00 6.00 8.00 4.00 30.00 4.29
3 Ketebalan Area yg Dikeruk (m) 4.00 4.00 5.55 5.55 4.00 23.10 3.30
4 Volume Material yg Dihasilkan (m3) 1,200.00 1,200.00 1,665.00 2,220.00 800.00 7,085.00 1,012.14 3,000.00
34%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 300.00 300.00 300.00 400.00 200.00 1,500.00 214.29

6 Konversi Luasan (Mencapai Target - - - - - - -


-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 50.00 21.18 38.71 28.74 29.63 145.83 300.00
produktivitas Per Jam kalender (m3 / jam) 0.29 0.29 0.40 0.40 0.29 49%

2,220.00 13.92 159.52 145.83


Realisasi Progres Pengerukan Area A sd Minggu ke 135

Progres Realisasi
Kontrak Luasan Minggu Ke - 134 Minggu Ke - 135 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 115,994.50 70,215.08 57.80% 7,085.00 1,500.00 1.23% 123,079.50 71,715.08 59.04%
KUMULATIF TERHADAP KONTRAK 70,093.32 59.04%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 196,448.95 73.37% 1,500.00 0.56% 197,948.95 73.93%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 10,685.00 m3
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 2,550.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari
Sisa Durasi : 20.00 hari
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini
Volume Material yg Didapat Minggu Ini (V) : 7,085.00 M3
Konversi Luasan yg Didapat (L) : 1,500.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 136 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
04-Jan-20 05-Jan-20 06-Jan-20 07-Jan-20 08-Jan-20 09-Jan-20 10-Jan-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track B B B B B B B
3 Mulai Pengerukan di STA. 184.00 190.00 202.00 208.00 220.00 230.00
4 Selesai Pengerukan di STA. 190.00 202.00 208.00 220.00 230.00 240.00
5 Panjang Hasil Pengerukan 6.00 12.00 6.00 12.00 10.00 10.00 56.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 4 0 20 20 15 50 16 45 9 10 8 35 72.00 160.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 4.00 20.33 15.83 16.75 9.17 8.58 74.67 1.00 10.67 12.00
1.00 1.00 1.00 1.00 1.00 1.00 6.00

C. Kedalaman Pengerukan 89%


1 Rata - Rata Level Eksisting (m) - 8.00 - 8.00 - 8.00 - 11.00 - 11.00 - 11.00
2 Rata - Rata Level Dikeruk (m) - 11.00 - 12.50 - 12.50 - 13.55 - 13.55 - 13.00
3 Rata - Rata Ketebalan yg Dikeruk (m) 3.00 4.50 4.50 2.55 2.55 2.00 Standby perbaikan water pump 19.10 3.18
engine

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 6.00 12.00 6.00 12.00 10.00 10.00 56.00 8.00
3 Ketebalan Area yg Dikeruk (m) 3.00 4.50 4.50 2.55 2.55 2.00 19.10 2.73
4 Volume Material yg Dihasilkan (m3) 900.00 2,700.00 1,350.00 1,530.00 1,275.00 1,000.00 8,755.00 1,250.71 3,000.00
42%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 300.00 600.00 300.00 600.00 500.00 500.00 2,800.00 400.00
Konversi Luasan (Mencapai Target
6 - - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 75.00 29.51 18.95 35.82 54.55 58.25 117.25 300.00
produktivitas Per Jam kalender (m3 / jam) 0.21 0.32 0.32 0.18 0.18 0.14 39%

1,000.00 8.58 116.50


Realisasi Progres Pengerukan Area A sd Minggu ke 136

Progres Realisasi
Kontrak Luasan Minggu Ke - 135 Minggu Ke - 136 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 123,079.50 71,715.08 59.04% 8,755.00 2,800.00 2.31% 383,332.14 87,347.85 71.91%
KUMULATIF TERHADAP KONTRAK 85,372.57 71.91%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 197,948.95 73.93% 2,800.00 1.05% 213,581.72 79.77%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 19,440.00 m3 79.77%
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 5,350.00 m2 0.00%
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari 0.7977
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari
Sisa Durasi : 20.00 hari 47.15% 32.62%
Volume Didapat : 50,347.10 m3 87,347.85 m2
Luasan Didapat : 31,956.11 m2 383,332.14 m3

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini
Volume Material yg Didapat Minggu Ini (V) : 8,755.00 M3
Konversi Luasan yg Didapat (L) : 2,800.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 137 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
11-Jan-20 12-Jan-20 13-Jan-20 14-Jan-20 15-Jan-20 16-Jan-20 17-Jan-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track B B B B B B B
3 Mulai Pengerukan di STA. 240.00 152.00 161.00 169.00
4 Selesai Pengerukan di STA. 251.00 161.00 169.00 177.00
5 Panjang Hasil Pengerukan 11.00 12.00 8.00 8.00 39.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 8 15 11 55 9 0 7 35 35.00 105.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 8.25 11.92 9.00 7.58 36.75 - 5.25 12.00
1.00 1.00 1.00 1.00 4.00

C. Kedalaman Pengerukan 44%


1 Rata - Rata Level Eksisting (m) - 10.00 - 12.00 - 10.00 - 6.00
2 Rata - Rata Level Dikeruk (m) - 13.55 - 13.55 - 13.55 - 9.00
3 Rata - Rata Ketebalan yg Dikeruk (m) STANDBY PERBAIKAN WATER PUMP MAIN ENGINE 3.55 1.55 3.55 3.00 11.65 1.94

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 11.00 12.00 8.00 8.00 39.00 5.57
3 Ketebalan Area yg Dikeruk (m) 3.55 1.55 3.55 3.00 11.65 1.66
4 Volume Material yg Dihasilkan (m3) 1,952.50 930.00 1,420.00 1,200.00 5,502.50 786.07 3,000.00
26%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 550.00 600.00 400.00 400.00 1,950.00 278.57

6 Konversi Luasan (Mencapai Target - - - - - -


-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 66.67 50.35 44.44 52.75 149.73 300.00
produktivitas Per Jam kalender (m3 / jam) 0.25 0.11 0.25 0.21 50%

1,420.00 9.00 157.78


Realisasi Progres Pengerukan Area A sd Minggu ke 137

Progres Realisasi
Kontrak Luasan Minggu Ke - 136 Minggu Ke - 137 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 383,332.14 87,347.85 71.91% 5,502.50 1,950.00 1.61% 388,834.64 89,297.85 73.51%
KUMULATIF TERHADAP KONTRAK 87,278.48 73.51%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 213,581.72 79.77% 1,950.00 0.73% 215,531.72 80.50%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 24,942.50 m3
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 7,300.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari
Sisa Durasi : 20.00 hari
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini
Volume Material yg Didapat Minggu Ini (V) : 5,502.50 M3
Konversi Luasan yg Didapat (L) : 1,950.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 138 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
18-Jan-20 19-Jan-20 20-Jan-20 21-Jan-20 22-Jan-20 23-Jan-20 24-Jan-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track B B B B B B B
3 Mulai Pengerukan di STA. 177.00 187.00 203.00 211.00 218.00 226.00 232.00
4 Selesai Pengerukan di STA. 187.00 203.00 211.00 218.00 226.00 232.00 239.00
5 Panjang Hasil Pengerukan 10.00 16.00 8.00 7.00 8.00 6.00 7.00 62.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 16 15 17 45 11 45 15 45 2 40 7 45 13 25 81.00 260.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 16.25 17.75 11.75 15.75 2.67 7.75 13.42 85.33 1.00 12.19 12.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 7.00

C. Kedalaman Pengerukan 102%


1 Rata - Rata Level Eksisting (m) - 8.00 - 9.00 - 8.00 - 8.00 - 8.00 - 7.00 - 11.00
2 Rata - Rata Level Dikeruk (m) - 11.00 - 11.50 - 11.00 - 12.50 - 11.00 - 11.00 - 13.55
3 Rata - Rata Ketebalan yg Dikeruk (m) 3.00 2.50 3.00 4.50 3.00 4.00 2.55 22.55 3.76

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 10.00 16.00 8.00 7.00 8.00 6.00 7.00 62.00 8.86
3 Ketebalan Area yg Dikeruk (m) 3.00 2.50 3.00 4.50 3.00 4.00 2.55 22.55 3.22
4 Volume Material yg Dihasilkan (m3) 1,500.00 2,000.00 1,200.00 1,575.00 1,200.00 1,200.00 892.50 9,567.50 1,366.79 3,000.00
46%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 500.00 800.00 400.00 350.00 400.00 300.00 350.00 3,100.00 442.86

6 Konversi Luasan (Mencapai Target - - - - - - - - -


-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 30.77 45.07 34.04 22.22 150.00 38.71 26.09 112.12 300.00
produktivitas Per Jam kalender (m3 / jam) 0.21 0.18 0.21 0.32 0.21 0.29 0.18 37%

1,200.00 11.75 102.13


Realisasi Progres Pengerukan Area A sd Minggu ke 138

Progres Realisasi
Kontrak Luasan Minggu Ke - 137 Minggu Ke - 138 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 388,834.64 89,297.85 73.51% 9,567.50 3,100.00 2.55% 398,402.14 92,397.85 76.07%
KUMULATIF TERHADAP KONTRAK 90,308.37 76.07%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 215,531.72 80.50% 3,100.00 1.16% 218,631.72 81.66%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 34,510.00 m3
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 10,400.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari
Sisa Durasi : 20.00 hari
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini
Volume Material yg Didapat Minggu Ini (V) : 9,567.50 M3
Konversi Luasan yg Didapat (L) : 3,100.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 139 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
25-Jan-20 26-Jan-20 27-Jan-20 28-Jan-20 29-Jan-20 30-Jan-20 31-Jan-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track B B B B B B B
3 Mulai Pengerukan di STA. 156.00 173.00 178.00 183.00 188.00 194.00 198.00 198.00
4 Selesai Pengerukan di STA. 17.00 178.00 183.00 188.00 194.00 198.00 198.00 206.00
5 Panjang Hasil Pengerukan 5.00 5.00 5.00 6.00 4.00 - 8.00 33.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 12 55 15 20 11 35 12 20 10 45 0 30 12 15 72.00 220.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 12.92 15.33 11.58 12.33 10.75 0.50 12.25 75.67 1.00 10.81 12.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 7.00

C. Kedalaman Pengerukan 90%


1 Rata - Rata Level Eksisting (m) - 8.50 - 8.50 - 10.00 - 7.00 - 10.50 - - 10.00
2 Rata - Rata Level Dikeruk (m) - 13.55 - 11.00 - 12.00 - 12.00 - 13.55 - - 13.00
3 Rata - Rata Ketebalan yg Dikeruk (m) 5.05 2.50 2.00 5.00 3.05 - 3.00 20.60 3.43

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 5.00 5.00 5.00 6.00 4.00 - 8.00 33.00 4.71
3 Ketebalan Area yg Dikeruk (m) 5.05 2.50 2.00 5.00 3.05 - 3.00 20.60 2.94
4 Volume Material yg Dihasilkan (m3) 1,262.50 625.00 500.00 1,500.00 610.00 - 1,200.00 5,697.50 813.93 3,000.00
27%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 250.00 250.00 250.00 300.00 200.00 - 400.00 1,650.00 235.71

6 Konversi Luasan (Mencapai Target - - - - - - - - -


-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 19.35 16.30 21.58 24.32 18.60 - 32.65 75.30 300.00
produktivitas Per Jam kalender (m3 / jam) 0.36 0.18 0.14 0.36 0.22 - 0.21 25%

- 0.50 0.00
Realisasi Progres Pengerukan Area A sd Minggu ke 139

Progres Realisasi
Kontrak Luasan Minggu Ke - 137 Minggu Ke - 138 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 398,402.14 92,397.85 76.07% 5,697.50 1,650.00 1.36% 404,099.64 94,047.85 77.42%
KUMULATIF TERHADAP KONTRAK 91,921.06 77.42%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 218,631.72 81.66% 1,650.00 0.62% 220,281.72 82.27%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 40,207.50 m3
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 12,050.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari
Sisa Durasi : 20.00 hari
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini
Volume Material yg Didapat Minggu Ini (V) : 5,697.50 M3
Konversi Luasan yg Didapat (L) : 1,650.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 140 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
01-Feb-20 02-Feb-20 03-Feb-20 04-Feb-20 05-Feb-20 06-Feb-20 07-Feb-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track B B B B B B B
3 Mulai Pengerukan di STA. 206.00 215.00 224.00 234.00 243.00 253.00 253.00
4 Selesai Pengerukan di STA. 215.00 224.00 234.00 243.00 253.00 253.00 253.00
5 Panjang Hasil Pengerukan 9.00 9.00 10.00 9.00 10.00 - - 47.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 12 45 12 35 13 0 13 15 7 15 0 0 0 0 57.00 110.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 12.75 12.58 13.00 13.25 7.25 0.00 0.00 58.83 - 8.40 12.00
1.00 1.00 1.00 1.00 1.00 0.00 0.00 5.00

C. Kedalaman Pengerukan 70%


1 Rata - Rata Level Eksisting (m) - 9.00 - 9.00 - 10.00 - 10.00 - 11.00 - -
2 Rata - Rata Level Dikeruk (m) - 13.00 - 13.55 - 13.55 - 13.20 - 13.55 - -
3 Rata - Rata Ketebalan yg Dikeruk (m) 4.00 4.55 3.55 3.20 2.55 - - 17.85 2.98

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 9.00 9.00 10.00 9.00 10.00 - - 47.00 6.71
3 Ketebalan Area yg Dikeruk (m) 4.00 4.55 3.55 3.20 2.55 - - 17.85 2.55
4 Volume Material yg Dihasilkan (m3) 1,800.00 2,047.50 1,775.00 1,440.00 1,275.00 - - 8,337.50 1,191.07 3,000.00
40%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 450.00 450.00 500.00 450.00 500.00 - - 2,350.00 335.71

6 Konversi Luasan (Mencapai Target - - - - - - - - -


-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 35.29 35.76 38.46 33.96 68.97 #DIV/0! #DIV/0! 141.71 300.00
produktivitas Per Jam kalender (m3 / jam) 0.29 0.33 0.25 0.23 0.18 - - 47%

1,275.00 7.25 175.86


Realisasi Progres Pengerukan Area A sd Minggu ke 140

Progres Realisasi
Kontrak Luasan Minggu Ke - 139 Minggu Ke - 140 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 404,099.64 94,047.85 77.42% 8,337.50 2,350.00 1.93% 412,437.14 96,397.85 79.36%
KUMULATIF TERHADAP KONTRAK 94,217.92 79.36%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 220,281.72 82.27% 2,350.00 0.88% 222,631.72 83.15%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 48,545.00 m3
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 14,400.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari
Sisa Durasi : 20.00 hari
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini
Volume Material yg Didapat Minggu Ini (V) : 8,337.50 M3
Konversi Luasan yg Didapat (L) : 2,350.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 141 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
08-Feb-20 09-Feb-20 10-Feb-20 11-Feb-20 12-Feb-20 13-Feb-20 14-Feb-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track B B B B B B B
3 Mulai Pengerukan di STA. 253.00 253.00 253.00 253.00 253.00 253.00 253.00
4 Selesai Pengerukan di STA. 253.00 253.00 253.00 253.00 253.00 253.00 253.00
5 Panjang Hasil Pengerukan - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan 0%
1 Rata - Rata Level Eksisting (m) - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - 3,000.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - -

6 Konversi Luasan (Mencapai Target - - - - - - - - -


-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) - - - - - - - #DIV/0!

- - #DIV/0!
Realisasi Progres Pengerukan Area A sd Minggu ke 141

Progres Realisasi
Kontrak Luasan Minggu Ke - 140 Minggu Ke - 141 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 412,437.14 96,397.85 79.36% - - 0.00% 412,437.14 96,397.85 79.36%
KUMULATIF TERHADAP KONTRAK 94,217.92 79.36%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 222,631.72 83.15% - 0.00% 222,631.72 83.15%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 48,545.00 m3
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 14,400.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari
Sisa Durasi : 20.00 hari
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini
Volume Material yg Didapat Minggu Ini (V) : - M3
Konversi Luasan yg Didapat (L) : - M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 142 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
15-Feb-20 16-Feb-20 17-Feb-20 18-Feb-20 19-Feb-20 20-Feb-20 21-Feb-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track B B B B B c c
3 Mulai Pengerukan di STA. 253.00 253.00 259.00 265.00 273.00 112.00 114.00
4 Selesai Pengerukan di STA. 253.00 259.00 265.00 273.00 279.00 114.00 114.00
5 Panjang Hasil Pengerukan - 6.00 6.00 8.00 6.00 2.00 - 28.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 9 55 11 35 12 15 12 25 6 5 0 55 50.00 190.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 9.92 11.58 12.25 12.42 6.08 0.92 53.17 - 7.60 12.00
0.00 1.00 1.00 1.00 1.00 1.00 1.00 6.00

C. Kedalaman Pengerukan 63%


1 Rata - Rata Level Eksisting (m) - - 11.00 - 9.00 - 9.00 - 8.00 - 5.00 -
2 Rata - Rata Level Dikeruk (m) - - 13.55 - 13.55 - 13.55 - 13.00 - 11.50 -
3 Rata - Rata Ketebalan yg Dikeruk (m) - 2.55 4.55 4.55 5.00 6.50 - 23.15 3.86

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - 6.00 6.00 8.00 6.00 2.00 - 28.00 4.00
3 Ketebalan Area yg Dikeruk (m) - 2.55 4.55 4.55 5.00 6.50 - 23.15 3.31
4 Volume Material yg Dihasilkan (m3) - 765.00 1,365.00 1,820.00 1,500.00 650.00 - 6,100.00 871.43 3,000.00
29%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - 300.00 300.00 400.00 300.00 100.00 - 1,400.00 200.00

6 Konversi Luasan (Mencapai Target - - - - - - - - -


-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! 30.25 25.90 32.65 24.16 16.44 - 114.73 300.00
produktivitas Per Jam kalender (m3 / jam) - 0.18 0.33 0.33 0.36 0.46 - 38%

650.00 6.08 106.85

12.58 13.00 13.25 7.25 9.92 11.58 12.25 12.42 11.53 92.25
Realisasi Progres Pengerukan Area A sd Minggu ke 142

Progres Realisasi
Kontrak Luasan Minggu Ke - 141 Minggu Ke - 142 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 412,437.14 96,397.85 79.36% 6,100.00 1,400.00 1.15% 418,537.14 97,797.85 80.51%
KUMULATIF TERHADAP KONTRAK 95,586.26 80.51%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 222,631.72 83.15% 1,400.00 0.52% 224,031.72 83.67%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 54,645.00 m3
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 15,800.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c
Sisa Durasi : 20.00 hari 650.00 m3
Volume Didapat : 50,347.10 m3 100.00 m2
Luasan Didapat : 31,956.11 m2

B. Realisasi Minggu Ini


Realisasi Pengerukan Minggu Ini
Volume Material yg Didapat Minggu Ini (V) : 6,100.00 M3
Konversi Luasan yg Didapat (L) : 1,400.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 143 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
22-Feb-20 23-Feb-20 24-Feb-20 25-Feb-20 26-Feb-20 27-Feb-20 28-Feb-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c c c c
3 Mulai Pengerukan di STA. 114.00 114.00 116.00 118.00 118.00 118.00 130.00
4 Selesai Pengerukan di STA. 116.00 116.00 118.00 118.00 118.00 130.00 132.00
5 Panjang Hasil Pengerukan 2.00 2.00 2.00 - - 12.00 2.00 20.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 9 15 6 20 7 55 0 0 0 0 10 50 5 25 37.00 165.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 9.25 6.33 7.92 0.00 0.00 10.83 5.42 39.75 - 5.68 12.00
1.00 1.00 1.00 0.00 0.00 1.00 1.00 5.00

C. Kedalaman Pengerukan 47%


1 Rata - Rata Level Eksisting (m) - 8.00 - 11.50 - 8.00 - - - 7.00 - 6.00
2 Rata - Rata Level Dikeruk (m) - 11.50 - 13.55 - 11.55 - - - 11.00 - 9.00
3 Rata - Rata Ketebalan yg Dikeruk (m) 3.50 2.05 3.55 - - 4.00 3.00 16.10 2.68

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 2.00 2.00 2.00 - - 12.00 2.00 20.00 2.86
3 Ketebalan Area yg Dikeruk (m) 3.50 2.05 3.55 - - 4.00 3.00 16.10 2.30
4 Volume Material yg Dihasilkan (m3) 350.00 205.00 355.00 - - 2,400.00 300.00 3,610.00 515.71 3,000.00
17%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 100.00 100.00 100.00 - - 600.00 100.00 1,000.00 142.86
Konversi Luasan (Mencapai Target
6 - - - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 10.81 15.79 12.63 #DIV/0! #DIV/0! 55.38 18.46 90.82 300.00
produktivitas Per Jam kalender (m3 / jam) 0.25 0.15 0.25 - - 0.29 0.21 30%

300.00 5.42 55.38

6.33 7.92 - - 10.83 5.42 5.08 30.50


Realisasi Progres Pengerukan Area A sd Minggu ke 143

Progres Realisasi
Kontrak Luasan Minggu Ke - 142 Minggu Ke - 143 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 418,537.14 97,797.85 80.51% 3,610.00 1,000.00 0.82% 422,147.14 98,797.85 81.33%
KUMULATIF TERHADAP KONTRAK 96,563.65 81.33%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 224,031.72 83.67% 1,000.00 0.37% 225,031.72 84.05%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 58,255.00 m3
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 16,800.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c
Sisa Durasi : 20.00 hari 4,260.00 m3
Volume Didapat : 50,347.10 m3 1,100.00 m2
Luasan Didapat : 31,956.11 m2 sisa kubikasi 165,740.00
estimasi 82.87
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 9/27/21
Volume Material yg Didapat Minggu Ini (V) : 3,610.00 M3
Konversi Luasan yg Didapat (L) : 1,000.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 144 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
29-Feb-20 01-Mar-20 02-Mar-20 03-Mar-20 04-Mar-20 05-Mar-20 06-Mar-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c c c c
3 Mulai Pengerukan di STA. 132.00 132.00 132.00 132.00 132.00 138.00 144.00
4 Selesai Pengerukan di STA. 132.00 132.00 132.00 132.00 138.00 144.00 150.00
5 Panjang Hasil Pengerukan - - - - 6.00 6.00 6.00 18.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 8 50 10 30 13 50 31.00 130.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 8.83 10.50 13.83 33.17 - 4.74 12.00
0.00 0.00 0.00 0.00 1.00 1.00 1.00 3.00

C. Kedalaman Pengerukan 39%


1 Rata - Rata Level Eksisting (m) - - - - - 9.00 - 8.00 - 8.00
2 Rata - Rata Level Dikeruk (m) - - - - - 12.00 - 11.00 - 12.00
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - 3.00 3.00 4.00 10.00 1.67

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - 6.00 6.00 6.00 18.00 2.57
3 Ketebalan Area yg Dikeruk (m) - - - - 3.00 3.00 4.00 10.00 1.43
4 Volume Material yg Dihasilkan (m3) - - - - 900.00 900.00 1,200.00 3,000.00 428.57 3,000.00
14%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - 300.00 300.00 300.00 900.00 128.57
Konversi Luasan (Mencapai Target
6 - - - - - - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! 33.96 28.57 21.69 90.45 300.00
produktivitas Per Jam kalender (m3 / jam) - - - - 0.21 0.21 0.29 30%

1,200.00 13.83 86.75

- 0.00 - - 8.83 10.50 13.83 4.74 33.17


Realisasi Progres Pengerukan Area A sd Minggu ke 144

Progres Realisasi
Kontrak Luasan Minggu Ke - 143 Minggu Ke - 144 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 422,147.14 98,797.85 81.33% 3,000.00 900.00 0.74% 425,147.14 99,697.85 82.08%
KUMULATIF TERHADAP KONTRAK 97,443.29 82.08%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 225,031.72 84.05% 900.00 0.34% 225,931.72 84.38%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 61,255.00 m3
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 17,700.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c
Sisa Durasi : 20.00 hari 7,260.00 m3
Volume Didapat : 50,347.10 m3 2,000.00 m2
Luasan Didapat : 31,956.11 m2 sisa kubikasi 162,740.00
estimasi 81.37
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 9/27/21
Volume Material yg Didapat Minggu Ini (V) : 3,000.00 M3
Konversi Luasan yg Didapat (L) : 900.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 144 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
07-Mar-20 08-Mar-20 09-Mar-20 10-Mar-20 11-Mar-20 12-Mar-20 13-Mar-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c c c c
3 Mulai Pengerukan di STA. 150.00 159.00 165.00 171.00 177.00 183.00 189.00
4 Selesai Pengerukan di STA. 159.00 165.00 171.00 177.00 183.00 189.00 189.00
5 Panjang Hasil Pengerukan 9.00 6.00 6.00 6.00 6.00 6.00 - 39.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 14 15 12 5 11 55 9 5 7 35 8 0 0 0 61.00 115.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 14.25 12.08 11.92 9.08 7.58 8.00 0.00 62.92 1.00 8.99 12.00
1.00 1.00 1.00 1.00 1.00 1.00 0.00 6.00

C. Kedalaman Pengerukan 75%


1 Rata - Rata Level Eksisting (m) - 8.00 - 8.00 - 8.00 - 7.00 - 8.00 - 8.00 -
2 Rata - Rata Level Dikeruk (m) - 12.50 - 11.50 - 11.00 - 11.00 - 11.00 - 11.00 -
3 Rata - Rata Ketebalan yg Dikeruk (m) 4.50 3.50 3.00 4.00 3.00 3.00 - 21.00 3.50

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 9.00 6.00 6.00 6.00 6.00 6.00 - 39.00 5.57
3 Ketebalan Area yg Dikeruk (m) 4.50 3.50 3.00 4.00 3.00 3.00 - 21.00 3.00
4 Volume Material yg Dihasilkan (m3) 2,025.00 1,050.00 900.00 1,200.00 900.00 900.00 - 6,975.00 996.43 3,000.00
33%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 450.00 300.00 300.00 300.00 300.00 300.00 - 1,950.00 278.57
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 142.11 86.90 75.52 132.11 118.68 112.50 #DIV/0! 110.86 300.00
produktivitas Per Jam kalender (m3 / jam) 37%

900.00 8.00 112.50

14.25 12.08 11.92 9.08 11.83 47.33


Realisasi Progres Pengerukan Area A sd Minggu ke 144

Progres Realisasi
Kontrak Luasan Minggu Ke - 143 Minggu Ke - 144 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 425,147.14 99,697.85 82.08% 6,975.00 1,950.00 1.61% 432,122.14 101,647.85 83.68%
KUMULATIF TERHADAP KONTRAK 99,349.20 83.68%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 225,931.72 84.38% 1,950.00 0.73% 227,881.72 85.11%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 68,230.00 m3
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 19,650.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c
Sisa Durasi : 20.00 hari 14,235.00 m3
Volume Didapat : 50,347.10 m3 3,950.00 m2
Luasan Didapat : 31,956.11 m2 sisa kubikasi 155,765.00
estimasi 77.88
B. Realisasi Minggu Ini tanggal selesai 7/6/21 3/11/2020
Realisasi Pengerukan Minggu Ini 9/27/21 5/27/2020
Volume Material yg Didapat Minggu Ini (V) : 6,975.00 M3
Konversi Luasan yg Didapat (L) : 1,950.00 M2 total jam efektif rata rata jam efektif
111.00 6.53
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 146 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
14-Mar-20 15-Mar-20 16-Mar-20 17-Mar-20 18-Mar-20 19-Mar-20 20-Mar-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c c c c
3 Mulai Pengerukan di STA. 189.00 189.00 197.00 207.00 219.00 229.00 237.00
4 Selesai Pengerukan di STA. 189.00 197.00 207.00 219.00 229.00 237.00 237.00
5 Panjang Hasil Pengerukan - 8.00 10.00 12.00 10.00 8.00 - 48.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 9 0 14 40 17 40 14 5 9 20 0 0 63.00 105.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 9.00 14.67 17.67 14.08 9.33 0.00 64.75 1.00 9.25 12.00
0.00 1.00 1.00 1.00 1.00 1.00 0.00 5.00

C. Kedalaman Pengerukan 77%


1 Rata - Rata Level Eksisting (m) - - 9.00 - 7.00 - 7.00 - 7.50 - 8.00 -
2 Rata - Rata Level Dikeruk (m) - - 12.00 - 11.50 - 11.00 - 11.50 - 11.50 -
3 Rata - Rata Ketebalan yg Dikeruk (m) - 3.00 4.50 4.00 4.00 3.50 - 19.00 3.17

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - 8.00 10.00 12.00 10.00 8.00 - 48.00 6.86
3 Ketebalan Area yg Dikeruk (m) - 3.00 4.50 4.00 4.00 3.50 - 19.00 2.71
4 Volume Material yg Dihasilkan (m3) - 1,200.00 2,250.00 2,400.00 2,000.00 1,400.00 - 9,250.00 1,321.43 3,000.00
44%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - 400.00 500.00 600.00 500.00 400.00 - 2,400.00 342.86
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! 133.33 153.41 135.85 142.01 150.00 #DIV/0! 142.86 300.00
produktivitas Per Jam kalender (m3 / jam) 48%
Realisasi Progres Pengerukan Area A sd Minggu ke 146

Progres Realisasi
Kontrak Luasan Minggu Ke - 145 Minggu Ke - 146 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 432,122.14 101,647.85 83.68% 9,250.00 2,400.00 1.98% 441,372.14 104,047.85 85.66%
KUMULATIF TERHADAP KONTRAK 101,694.92 85.66%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 227,881.72 85.11% 2,400.00 0.90% 230,281.72 86.01%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 77,480.00 m3
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 22,050.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c
Sisa Durasi : 20.00 hari 23,485.00 m3
Volume Didapat : 50,347.10 m3 6,350.00 m2
Luasan Didapat : 31,956.11 m2 sisa kubikasi 146,515.00
estimasi 73.26
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 9/17/21
Volume Material yg Didapat Minggu Ini (V) : 9,250.00 M3
Konversi Luasan yg Didapat (L) : 2,400.00 M2 total jam efektif rata rata jam efektif
9.00 1.50
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 146 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
21-Mar-20 22-Mar-20 23-Mar-20 24-Mar-20 25-Mar-20 26-Mar-20 27-Mar-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c c c c
3 Mulai Pengerukan di STA. 237.00 237.00 247.00 255.00 257.00 265.00 273.00
4 Selesai Pengerukan di STA. 237.00 247.00 255.00 257.00 265.00 273.00 281.00
5 Panjang Hasil Pengerukan - 10.00 8.00 2.00 8.00 8.00 8.00 44.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 11 35 15 30 3 30 11 20 9 15 9 45 58.00 175.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 11.58 15.50 3.50 11.33 9.25 9.75 60.92 1.00 8.70 12.00
0.00 1.00 1.00 1.00 1.00 1.00 1.00 6.00

C. Kedalaman Pengerukan 73%


1 Rata - Rata Level Eksisting (m) - - 8.00 - 9.00 - 8.00 - 8.00 - 10.00 - 11.00
2 Rata - Rata Level Dikeruk (m) - - 11.00 - 13.55 - 10.00 - 12.00 - 13.55 - 13.55
3 Rata - Rata Ketebalan yg Dikeruk (m) - 3.00 4.55 2.00 4.00 3.55 2.55 19.65 3.28

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - 10.00 8.00 2.00 8.00 8.00 8.00 44.00 6.29
3 Ketebalan Area yg Dikeruk (m) - 3.00 4.55 2.00 4.00 3.55 2.55 19.65 2.81
4 Volume Material yg Dihasilkan (m3) - 1,500.00 1,820.00 200.00 1,600.00 1,420.00 1,020.00 7,560.00 1,080.00 3,000.00
36%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - 500.00 400.00 100.00 400.00 400.00 400.00 2,200.00 314.29
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! 129.50 117.42 57.14 141.18 153.51 104.62 124.10 300.00
produktivitas Per Jam kalender (m3 / jam) 41%

1,420.00 9.25 153.51


Realisasi Progres Pengerukan Area A sd Minggu ke 147

Progres Realisasi
Kontrak Luasan Minggu Ke - 146 Minggu Ke - 147 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 441,372.14 104,047.85 85.66% 7,560.00 2,200.00 1.81% 448,932.14 106,247.85 87.47%
KUMULATIF TERHADAP KONTRAK 103,845.17 87.47%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 230,281.72 86.01% 2,200.00 0.82% 232,481.72 86.83%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 85,040.00 m3
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 24,250.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c
Sisa Durasi : 20.00 hari 31,045.00 m3
Volume Didapat : 50,347.10 m3 8,550.00 m2
Luasan Didapat : 31,956.11 m2 sisa kubikasi 138,955.00
estimasi 69.48
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 9/13/21
Volume Material yg Didapat Minggu Ini (V) : 7,560.00 M3
Konversi Luasan yg Didapat (L) : 2,200.00 M2 total jam efektif rata rata jam efektif
9.00 1.50
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 147 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
28-Mar-20 29-Mar-20 30-Mar-20 31-Mar-20 01-Apr-20 02-Apr-20 03-Apr-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c c c c
3 Mulai Pengerukan di STA. 237.00 251.00 261.00 261.00 267.00 275.00 282.00
4 Selesai Pengerukan di STA. 251.00 261.00 261.00 267.00 275.00 282.00 294.00
5 Panjang Hasil Pengerukan 14.00 10.00 - 6.00 8.00 7.00 12.00 57.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 11 45 9 30 0 0 6 15 12 0 10 30 11 15 59.00 135.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 11.75 9.50 0.00 6.25 12.00 10.50 11.25 61.25 1.00 8.75 12.00
1.00 1.00 0.00 1.00 1.00 1.00 1.00 6.00

C. Kedalaman Pengerukan 73%


1 Rata - Rata Level Eksisting (m) - 11.00 - 11.00 - - 11.00 - 10.00 - 8.00 - 7.00
2 Rata - Rata Level Dikeruk (m) - 13.55 - 13.55 - - 13.55 - 13.55 - 12.00 - 11.00
3 Rata - Rata Ketebalan yg Dikeruk (m) 2.55 2.55 - 2.55 3.55 4.00 4.00 19.20 3.20

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 14.00 10.00 - 6.00 8.00 7.00 12.00 57.00 8.14
3 Ketebalan Area yg Dikeruk (m) 2.55 2.55 - 2.55 3.55 4.00 4.00 19.20 2.74
4 Volume Material yg Dihasilkan (m3) 1,785.00 1,275.00 - 765.00 1,420.00 1,400.00 2,400.00 9,045.00 1,292.14 3,000.00
43%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 700.00 500.00 - 300.00 400.00 350.00 600.00 2,850.00 407.14
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 151.91 134.21 #DIV/0! 122.40 118.33 133.33 213.33 147.67 300.00
produktivitas Per Jam kalender (m3 / jam) 49%

2,400.00 11.25 213.33


Realisasi Progres Pengerukan Area A sd Minggu ke 148

Progres Realisasi
Kontrak Luasan Minggu Ke - 147 Minggu Ke - 148 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 448,932.14 106,247.85 87.47% 9,045.00 2,850.00 2.35% 457,977.14 109,097.85 89.81%
KUMULATIF TERHADAP KONTRAK 106,630.72 89.81%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 232,481.72 86.83% 2,850.00 1.06% 235,331.72 87.89%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 94,085.00 m3
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 27,100.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c
Sisa Durasi : 20.00 hari 40,090.00 m3
Volume Didapat : 50,347.10 m3 11,400.00 m2
Luasan Didapat : 31,956.11 m2 sisa kubikasi 129,910.00
estimasi 64.96
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 9/8/21
Volume Material yg Didapat Minggu Ini (V) : 9,045.00 M3
Konversi Luasan yg Didapat (L) : 2,850.00 M2 total jam efektif rata rata jam efektif
9.00 1.50
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 149 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
04-Apr-20 05-Apr-20 06-Apr-20 07-Apr-20 08-Apr-20 09-Apr-20 10-Apr-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c c c c
3 Mulai Pengerukan di STA. 294.00 308.00 316.00 316.00 316.00 316.00 316.00
4 Selesai Pengerukan di STA. 308.00 316.00 316.00 316.00 316.00 316.00 324.00
5 Panjang Hasil Pengerukan 14.00 8.00 - - - - 8.00 30.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 13 15 8 40 0 0 0 0 0 0 0 0 10 25 31.00 80.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 13.25 8.67 0.00 0.00 0.00 0.00 10.42 32.33 - 4.62 12.00
1.00 1.00 0.00 0.00 0.00 0.00 1.00 3.00

C. Kedalaman Pengerukan 38%


1 Rata - Rata Level Eksisting (m) - 9.60 - 10.00 - - - - - 10.00
2 Rata - Rata Level Dikeruk (m) - 12.00 - 13.00 - - - - - 13.55
3 Rata - Rata Ketebalan yg Dikeruk (m) 2.40 3.00 - - - - 3.55 8.95 1.49

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 14.00 8.00 - - - - 8.00 30.00 4.29
3 Ketebalan Area yg Dikeruk (m) 2.40 3.00 - - - - 3.55 8.95 1.28
4 Volume Material yg Dihasilkan (m3) 1,680.00 1,200.00 - - - - 1,420.00 4,300.00 614.29 1,800.00
34%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 700.00 400.00 - - - - 400.00 1,500.00 214.29
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 126.79 138.46 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 136.32 132.99 300.00
produktivitas Per Jam kalender (m3 / jam) 44%

1,420.00 10.42 136.32


Realisasi Progres Pengerukan Area A sd Minggu ke 149

Progres Realisasi
Kontrak Luasan Minggu Ke - 148 Minggu Ke - 149 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 457,977.14 109,097.85 89.81% 4,300.00 1,500.00 1.23% 462,277.14 110,597.85 91.05%
KUMULATIF TERHADAP KONTRAK 108,096.80 91.05%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 235,331.72 87.89% 1,500.00 0.56% 236,831.72 88.45%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 98,385.00 m3
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 28,600.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c keseluruhan area
Sisa Durasi : 20.00 hari 44,390.00 m3 195,610.00
Volume Didapat : 50,347.10 m3 12,900.00 m2
Luasan Didapat : 31,956.11 m2 sisa kubikasi 125,610.00
estimasi 62.81
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 9/6/21
Volume Material yg Didapat Minggu Ini (V) : 4,300.00 M3
Konversi Luasan yg Didapat (L) : 1,500.00 M2 total jam efektif rata rata jam efektif
9.00 1.50
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 150 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
11-Apr-20 12-Apr-20 13-Apr-20 14-Apr-20 15-Apr-20 16-Apr-20 17-Apr-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c c c c
3 Mulai Pengerukan di STA. 294.00 168.00 178.00 188.00 200.00 208.00 218.00
4 Selesai Pengerukan di STA. 305.00 178.00 188.00 200.00 208.00 218.00 226.00
5 Panjang Hasil Pengerukan 11.00 10.00 10.00 12.00 8.00 10.00 8.00 69.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 12 40 12 20 8 20 10 5 10 35 13 55 12 5 77.00 180.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 12.67 12.33 8.33 10.08 10.58 13.92 12.08 80.00 1.00 11.43 12.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 7.00

C. Kedalaman Pengerukan 95%


1 Rata - Rata Level Eksisting (m) - 9.00 - 10.00 - 11.00 - 11.00 - 11.00 - 11.00 - 11.00
2 Rata - Rata Level Dikeruk (m) - 13.00 - 13.55 - 13.55 - 13.55 - 13.55 - 13.55 - 13.55
3 Rata - Rata Ketebalan yg Dikeruk (m) 4.00 3.55 2.55 2.55 2.55 2.55 2.55 20.30 3.38

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 11.00 10.00 10.00 12.00 8.00 10.00 8.00 69.00 9.86
3 Ketebalan Area yg Dikeruk (m) 4.00 3.55 2.55 2.55 2.55 2.55 2.55 20.30 2.90
4 Volume Material yg Dihasilkan (m3) 2,200.00 1,775.00 1,275.00 1,530.00 1,020.00 1,275.00 1,020.00 10,095.00 1,442.14 1,800.00
80%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 550.00 500.00 500.00 600.00 400.00 500.00 400.00 3,450.00 492.86
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 173.68 143.92 153.00 151.74 96.38 91.62 84.41 126.19 300.00
produktivitas Per Jam kalender (m3 / jam) 42%

1,530.00 10.08 151.74


Realisasi Progres Pengerukan Area A sd Minggu ke 150

Progres Realisasi
Kontrak Luasan Minggu Ke - 149 Minggu Ke - 150 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 457,977.14 109,097.85 89.81% 10,095.00 3,450.00 2.84% 468,072.14 112,547.85 92.65%
KUMULATIF TERHADAP KONTRAK 110,002.70 92.65%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 235,331.72 87.89% 3,450.00 1.29% 238,781.72 89.18%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 108,480.00 m3
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 32,050.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c
Sisa Durasi : 20.00 hari 54,485.00 m3
Volume Didapat : 50,347.10 m3 16,350.00 m2
Luasan Didapat : 31,956.11 m2 sisa kubikasi 115,515.00
estimasi 57.76
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 9/1/21
Volume Material yg Didapat Minggu Ini (V) : 10,095.00 M3
Konversi Luasan yg Didapat (L) : 3,450.00 M2 total jam efektif rata rata jam efektif
9.00 1.50
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 151 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
18-Apr-20 19-Apr-20 20-Apr-20 21-Apr-20 22-Apr-20 23-Apr-20 24-Apr-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 226.00 150.00 156.00 156.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 226.00 156.00 156.00 156.00 169.68 175.68 172.00
5 Panjang Hasil Pengerukan - 6.00 - - 3.68 6.00 3.00 18.68 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 10 0 8 20 10 5 8 15 14 45 9 35 59.00 120.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 10.00 8.33 10.08 8.25 14.75 9.58 61.00 1.00 8.71 12.00
0.00 1.00 1.00 1.00 1.00 1.00 1.00 6.00

C. Kedalaman Pengerukan 73%


1 Rata - Rata Level Eksisting (m) - - 9.50 - 11.00 - 11.00 - 8.50 - 10.00 - 11.80
2 Rata - Rata Level Dikeruk (m) - - 13.55 - 13.55 - 13.55 - 13.00 - 12.90 - 13.20
3 Rata - Rata Ketebalan yg Dikeruk (m) - 4.05 2.55 2.55 4.50 2.90 1.40 17.95 2.99

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - 6.00 - - 3.68 6.00 3.00 18.68 2.67
3 Ketebalan Area yg Dikeruk (m) - 4.05 2.55 2.55 4.50 2.90 1.40 17.95 2.56
4 Volume Material yg Dihasilkan (m3) - 1,215.00 - - 828.00 870.00 210.00 3,123.00 446.14 1,800.00
25%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - 300.00 - - 184.00 300.00 150.00 934.00 133.43
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! 121.50 - - 100.36 58.98 21.91 51.20 300.00
produktivitas Per Jam kalender (m3 / jam) 17%

210.00 9.58 21.91


Realisasi Progres Pengerukan Area A sd Minggu ke 151

Progres Realisasi
Kontrak Luasan Minggu Ke - 150 Minggu Ke - 151 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 468,072.14 112,547.85 92.65% 3,123.00 934.00 0.77% 471,195.14 113,481.85 93.42%
KUMULATIF TERHADAP KONTRAK 110,915.58 93.42%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 238,781.72 89.18% 934.00 0.35% 239,715.72 89.53%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 111,603.00 m3
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 32,984.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c1
Sisa Durasi : 20.00 hari 1,908.00 m3
Volume Didapat : 50,347.10 m3 634.00 m2
Luasan Didapat : 31,956.11 m2 sisa kubikasi 34,492.00
estimasi 22.99
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/28/21
Volume Material yg Didapat Minggu Ini (V) : 3,123.00 M3
Konversi Luasan yg Didapat (L) : 934.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 152 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
25-Apr-20 26-Apr-20 27-Apr-20 28-Apr-20 29-Apr-20 30-Apr-20 01-May-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 226.00 150.00 150.00 150.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 226.00 150.00 150.00 150.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan 0%
1 Rata - Rata Level Eksisting (m) - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - 1,800.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!

- - #DIV/0!
Realisasi Progres Pengerukan Area A sd Minggu ke 152

Progres Realisasi
Kontrak Luasan Minggu Ke - 151 Minggu Ke - 152 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 471,195.14 113,481.85 93.42% - - 0.00% 471,195.14 113,481.85 93.42%
KUMULATIF TERHADAP KONTRAK 110,915.58 93.42%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 239,715.72 89.53% - 0.00% 239,715.72 89.53%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock hasil baty
Luasan 121,470.39 M2 111,603.00 m3 82.75% 87347.85
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 32,984.00 m2 6.78%
Rasio Luas CCO Terhadap Kntrak Awal 100.00%
7,157.47 m2
Target Produktivitas Per jam : 179.81 m3 / jam 31,411.04 m3
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c1
Sisa Durasi : 20.00 hari 1,908.00 m3
Volume Didapat : 50,347.10 m3 634.00 m2
Luasan Didapat : 31,956.11 m2 sisa kubikasi 34,492.00
estimasi 22.99
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/28/21
Volume Material yg Didapat Minggu Ini (V) : - M3
Konversi Luasan yg Didapat (L) : - M2
Realisasi Progres Pengerukan Area A sd Minggu ke 152

Progres Realisasi
Kontrak Luasan Minggu Ke - 151 Minggu Ke - 152 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 418,397.59 95,338.03 78.49% - - 0.00% 418,397.59 95,338.03 78.49%
KUMULATIF TERHADAP KONTRAK 93,182.06 78.49%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 221,571.90 82.75% - 0.00% 221,571.90 82.75%

A. Target Pengerukan Termijn 6 hasil baty 82.75%


Volume 533,081.28 M3
Luasan 121,470.39 M2 79.77%
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 82.76% volume belum terkeruk baty 15 apr
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 205,019.47 m3
46,716.69 m2
Target Produktivitas Per jam : 179.81 m3 / jam 74,753.70
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area 2
Sisa Durasi : 20.00 hari 47.15% 35.61%
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2 95,338.03 m2
418,397.59 m3
B. Realisasi Minggu Ini
Realisasi Pengerukan Minggu Ini
Volume Material yg Didapat Minggu Ini (V) : - M3
Konversi Luasan yg Didapat (L) : - M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 153 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
02-May-20 03-May-20 04-May-20 05-May-20 06-May-20 07-May-20 08-May-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 226.00 150.00 150.00 150.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 226.00 150.00 150.00 150.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan 0%
1 Rata - Rata Level Eksisting (m) - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - 1,500.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!

- - #DIV/0!
Realisasi Progres Pengerukan Area A sd Minggu ke 153

Progres Realisasi
Kontrak Luasan Minggu Ke - 152 Minggu Ke - 153 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 418,397.59 95,338.03 78.49% - - 0.00% 418,397.59 95,338.03 78.49%
KUMULATIF TERHADAP KONTRAK 93,182.06 78.49%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 221,571.90 82.75% - 0.00% 221,571.90 82.75%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 111,603.00 m3
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 32,984.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c1
Sisa Durasi : 20.00 hari 1,908.00 m3
Volume Didapat : 50,347.10 m3 634.00 m2
Luasan Didapat : 31,956.11 m2 sisa kubikasi 34,492.00
estimasi 22.99
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/28/21
Volume Material yg Didapat Minggu Ini (V) : - M3
Konversi Luasan yg Didapat (L) : - M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 154 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
09-May-20 10-May-20 11-May-20 12-May-20 13-May-20 14-May-20 15-May-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 226.00 150.00 150.00 150.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 226.00 150.00 150.00 150.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan 0%
1 Rata - Rata Level Eksisting (m) - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - 1,500.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!

- - #DIV/0!
Realisasi Progres Pengerukan Area A sd Minggu ke 154

Progres Realisasi
Kontrak Luasan Minggu Ke - 153 Minggu Ke - 154 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 418,397.59 95,338.03 78.49% - - 0.00% 418,397.59 95,338.03 78.49%
KUMULATIF TERHADAP KONTRAK 93,182.06 78.49%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 221,571.90 82.75% - 0.00% 221,571.90 82.75%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 111,603.00 m3
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 32,984.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c1
Sisa Durasi : 20.00 hari 1,908.00 m3
Volume Didapat : 50,347.10 m3 634.00 m2
Luasan Didapat : 31,956.11 m2 sisa kubikasi 34,492.00
estimasi 22.99
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/28/21
Volume Material yg Didapat Minggu Ini (V) : - M3
Konversi Luasan yg Didapat (L) : - M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 154 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
16-May-20 17-May-20 18-May-20 19-May-20 20-May-20 21-May-20 22-May-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 226.00 150.00 150.00 150.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 226.00 150.00 150.00 150.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan 0%
1 Rata - Rata Level Eksisting (m) - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - 1,500.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!

- - #DIV/0!
Realisasi Progres Pengerukan Area A sd Minggu ke 155

Progres Realisasi
Kontrak Luasan Minggu Ke - 154 Minggu Ke - 155 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 418,397.59 95,338.03 78.49% - - 0.00% 418,397.59 95,338.03 78.49%
KUMULATIF TERHADAP KONTRAK 93,182.06 78.49%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 221,571.90 82.75% - 0.00% 221,571.90 82.75%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 111,603.00 m3
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 32,984.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c1
Sisa Durasi : 20.00 hari 1,908.00 m3
Volume Didapat : 50,347.10 m3 634.00 m2
Luasan Didapat : 31,956.11 m2 sisa kubikasi 34,492.00
estimasi 22.99
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/28/21
Volume Material yg Didapat Minggu Ini (V) : - M3
Konversi Luasan yg Didapat (L) : - M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 156 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
23-May-20 24-May-20 25-May-20 26-May-20 27-May-20 28-May-20 29-May-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 226.00 150.00 150.00 150.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 226.00 150.00 150.00 150.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan 0%
1 Rata - Rata Level Eksisting (m) - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - 1,500.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!

- - #DIV/0!
Realisasi Progres Pengerukan Area A sd Minggu ke 156

Progres Realisasi
Kontrak Luasan Minggu Ke - 155 Minggu Ke - 156 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 418,397.59 95,338.03 78.49% - - 0.00% 418,397.59 95,338.03 78.49%
KUMULATIF TERHADAP KONTRAK 93,182.06 78.49%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 221,571.90 82.75% - 0.00% 221,571.90 82.75%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 111,603.00 m3
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 32,984.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c1
Sisa Durasi : 20.00 hari 1,908.00 m3
Volume Didapat : 50,347.10 m3 634.00 m2
Luasan Didapat : 31,956.11 m2 sisa kubikasi 34,492.00
estimasi 22.99
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/28/21
Volume Material yg Didapat Minggu Ini (V) : - M3
Konversi Luasan yg Didapat (L) : - M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 156 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
30-May-20 31-May-20 01-Jun-20 02-Jun-20 03-Jun-20 04-Jun-20 05-Jun-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 226.00 150.00 150.00 150.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 226.00 150.00 150.00 150.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan 0%
1 Rata - Rata Level Eksisting (m) - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - 1,500.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!

- - #DIV/0!
Realisasi Progres Pengerukan Area A sd Minggu ke 157

Progres Realisasi
Kontrak Luasan Minggu Ke - 156 Minggu Ke - 157 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 418,397.59 95,338.03 78.49% - - 0.00% 418,397.59 95,338.03 78.49%
KUMULATIF TERHADAP KONTRAK 93,182.06 78.49%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 221,571.90 82.75% - 0.00% 221,571.90 82.75%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 111,603.00 m3
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 32,984.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c1
Sisa Durasi : 20.00 hari 1,908.00 m3
Volume Didapat : 50,347.10 m3 634.00 m2
Luasan Didapat : 31,956.11 m2 sisa kubikasi 34,492.00
estimasi 22.99
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/28/21
Volume Material yg Didapat Minggu Ini (V) : - M3
Konversi Luasan yg Didapat (L) : - M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 158 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
06-Jun-20 07-Jun-20 08-Jun-20 09-Jun-20 10-Jun-20 11-Jun-20 12-Jun-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 226.00 150.00 150.00 150.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 226.00 150.00 150.00 150.00 169.68 173.68 172.00
5 Panjang Hasil Pengerukan - - - - 1.00 4.00 8.00 13.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 2 30 5 30 5 0 12.00 60.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 2.50 5.50 5.00 13.00 - 6.50 12.00
0.00 0.00 0.00 0.00 1.00 1.00 1.00 3.00

C. Kedalaman Pengerukan 54%


1 Rata - Rata Level Eksisting (m) - - - - - 9.50 - 10.80 - 10.00
2 Rata - Rata Level Dikeruk (m) - - - - - 11.50 - 13.00 - 12.50
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - 2.00 2.20 2.50 6.70 1.12

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - 1.00 4.00 8.00 13.00 1.86
3 Ketebalan Area yg Dikeruk (m) - - - - 2.00 2.20 2.50 6.70 0.96
4 Volume Material yg Dihasilkan (m3) - - - - 100.00 440.00 1,000.00 1,540.00 770.00 1,500.00
51%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - 50.00 200.00 400.00 650.00 92.86
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! 40.00 80.00 200.00 118.46 300.00
produktivitas Per Jam kalender (m3 / jam) 39%

440.00 5.50 80.00


Realisasi Progres Pengerukan Area A sd Minggu ke 158

Progres Realisasi
Kontrak Luasan Minggu Ke - 157 Minggu Ke - 158 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 418,397.59 95,338.03 78.49% 1,540.00 650.00 0.54% 419,937.59 95,988.03 79.02%
KUMULATIF TERHADAP KONTRAK 93,817.36 79.02%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 221,571.90 82.75% 650.00 0.24% 222,221.90 83.00%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 113,143.00 m3 421,250.16
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 33,634.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c1 area 1
Sisa Durasi : 20.00 hari 3,448.00 m3
Volume Didapat : 50,347.10 m3 1,284.00 m2
Luasan Didapat : 31,956.11 m2 sisa kubikasi 32,952.00 185,484.18 m3
estimasi 21.97
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/27/21
Volume Material yg Didapat Minggu Ini (V) : 1,540.00 M3
Konversi Luasan yg Didapat (L) : 650.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 159 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
13-Jun-20 14-Jun-20 15-Jun-20 16-Jun-20 17-Jun-20 18-Jun-20 19-Jun-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 150.00 150.00 150.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 178.00 150.00 150.00 150.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan 6.00 - - - 6.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 12 15 0 45 0 0 0 0 0 0 0 0 0 0 12.00 60.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 12.25 0.75 0.00 0.00 0.00 0.00 0.00 13.00 - 6.50 12.00
1.00 1.00 0.00 0.00 0.00 0.00 0.00 2.00

C. Kedalaman Pengerukan 54%


1 Rata - Rata Level Eksisting (m) - 9.50 - - - - - -
2 Rata - Rata Level Dikeruk (m) - 13.00 - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) 3.50 - - - - - - 3.50 0.58

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 6.00 - - - - - - 6.00 0.86
3 Ketebalan Area yg Dikeruk (m) 3.50 - - - - - - 3.50 0.50
4 Volume Material yg Dihasilkan (m3) 1,050.00 - - - - - - 1,050.00 525.00 1,500.00
35%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 300.00 - - - - - - 300.00 42.86
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 85.71 - #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 80.77 300.00
produktivitas Per Jam kalender (m3 / jam) 27%

- - #DIV/0!
Realisasi Progres Pengerukan Area A sd Minggu ke 159

Progres Realisasi
Kontrak Luasan Minggu Ke - 158 Minggu Ke - 159 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 419,937.59 95,988.03 79.02% 1,050.00 300.00 0.25% 420,987.59 96,288.03 79.27%
KUMULATIF TERHADAP KONTRAK 94,110.58 79.27%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 222,221.90 83.00% 300.00 0.11% 222,521.90 83.11%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 112,653.00 m3 422,566.73
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 33,284.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c1 area 1
Sisa Durasi : 20.00 hari 4,498.00 m3
Volume Didapat : 50,347.10 m3 1,584.00 m2
Luasan Didapat : 31,956.11 m2 sisa kubikasi 31,902.00 184,434.18 m3
estimasi 21.27
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/27/21
Volume Material yg Didapat Minggu Ini (V) : 1,050.00 M3
Konversi Luasan yg Didapat (L) : 300.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 159 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
20-Jun-20 21-Jun-20 22-Jun-20 23-Jun-20 24-Jun-20 25-Jun-20 26-Jun-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 150.00 150.00 150.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 172.00 150.00 150.00 150.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan 0%
1 Rata - Rata Level Eksisting (m) - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - 1,500.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!

- - #DIV/0!
Realisasi Progres Pengerukan Area A sd Minggu ke 159

Progres Realisasi
Kontrak Luasan Minggu Ke - 158 Minggu Ke - 159 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 420,987.59 96,288.03 79.27% - - 0.00% 420,987.59 96,288.03 79.27%
KUMULATIF TERHADAP KONTRAK 94,110.58 79.27%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 222,521.90 83.11% - 0.00% 222,521.90 83.11%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 111,603.00 m3 422,566.73
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 32,984.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c1 area 1
Sisa Durasi : 20.00 hari 4,498.00 m3
Volume Didapat : 50,347.10 m3 1,584.00 m2
Luasan Didapat : 31,956.11 m2 sisa kubikasi 31,902.00 184,434.18 m3
estimasi 21.27
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/27/21
Volume Material yg Didapat Minggu Ini (V) : - M3
Konversi Luasan yg Didapat (L) : - M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 161 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
27-Jun-20 28-Jun-20 29-Jun-20 30-Jun-20 01-Jul-20 02-Jul-20 03-Jul-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 150.00 150.00 150.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 172.00 150.00 150.00 150.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan 0%
1 Rata - Rata Level Eksisting (m) - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - 1,500.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!

- - #DIV/0!
Realisasi Progres Pengerukan Area A sd Minggu ke 159

Progres Realisasi
Kontrak Luasan Minggu Ke - 158 Minggu Ke - 159 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 420,987.59 96,288.03 79.27% - - 0.00% 420,987.59 96,288.03 79.27%
KUMULATIF TERHADAP KONTRAK 94,110.58 79.27%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 222,521.90 83.11% - 0.00% 222,521.90 83.11%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 111,603.00 m3 422,566.73
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 32,984.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c1 area 1
Sisa Durasi : 20.00 hari 4,498.00 m3
Volume Didapat : 50,347.10 m3 1,584.00 m2
Luasan Didapat : 31,956.11 m2 sisa kubikasi 31,902.00 184,434.18 m3
estimasi 21.27
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/27/21
Volume Material yg Didapat Minggu Ini (V) : - M3
Konversi Luasan yg Didapat (L) : - M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 162 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
04-Jul-20 05-Jul-20 06-Jul-20 07-Jul-20 08-Jul-20 09-Jul-20 10-Jul-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 150.00 150.00 150.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 172.00 150.00 150.00 150.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan - - - - 1.00 1.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 3 0 3.00 -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 3.00 3.00 - 1.50 12.00
0.00 0.00 0.00 0.00 0.00 0.00 1.00 1.00

C. Kedalaman Pengerukan 13%


1 Rata - Rata Level Eksisting (m) - - - - - - - 11.00
2 Rata - Rata Level Dikeruk (m) - - - - - - - 13.00
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - 2.00 2.00 0.33

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - 1.00 1.00 0.14
3 Ketebalan Area yg Dikeruk (m) - - - - - - 2.00 2.00 0.29
4 Volume Material yg Dihasilkan (m3) - - - - - - 100.00 100.00 50.00 1,500.00
3%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - 50.00 50.00 7.14
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 33.33 33.33 300.00
produktivitas Per Jam kalender (m3 / jam) 11%

100.00 3.00 33.33


Realisasi Progres Pengerukan Area A sd Minggu ke 162

Progres Realisasi
Kontrak Luasan Minggu Ke - 161 Minggu Ke - 162 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 420,987.59 96,288.03 79.27% 100.00 50.00 0.04% 421,087.59 96,338.03 79.31%
KUMULATIF TERHADAP KONTRAK 94,159.45 79.31%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 222,521.90 83.11% 50.00 0.02% 222,571.90 83.13%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 111,703.00 m3 422,786.16
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 33,034.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c1 area 1
Sisa Durasi : 20.00 hari 4,598.00 m3
Volume Didapat : 50,347.10 m3 1,634.00 m2
Luasan Didapat : 31,956.11 m2 sisa kubikasi 31,802.00 184,334.18 m3
estimasi 21.20
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/27/21
Volume Material yg Didapat Minggu Ini (V) : 100.00 M3
Konversi Luasan yg Didapat (L) : 50.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 163 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
11-Jul-20 12-Jul-20 13-Jul-20 14-Jul-20 15-Jul-20 16-Jul-20 17-Jul-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 174.00 179.00 179.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 174.00 179.00 179.00 179.00 169.68 169.68 169.00
5 Panjang Hasil Pengerukan 2.00 5.00 - - 5.00 12.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 2 0 6 0 0 0 0 0 6 25 0 0 0 0 14.00 25.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 2.00 6.00 0.00 0.00 6.42 0.00 0.00 14.42 - 2.06 12.00
1.00 1.00 0.00 0.00 1.00 0.00 0.00 3.00

C. Kedalaman Pengerukan 17%


1 Rata - Rata Level Eksisting (m) - 11.00 - 10.70 - - - 10.80 - -
2 Rata - Rata Level Dikeruk (m) - 13.50 - 13.50 - - - 13.55 - -
3 Rata - Rata Ketebalan yg Dikeruk (m) 2.50 2.80 - - 2.75 - - 8.05 1.34

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 2.00 5.00 - - 5.00 - - 12.00 1.71
3 Ketebalan Area yg Dikeruk (m) 2.50 2.80 - - 2.75 - - 8.05 1.15
4 Volume Material yg Dihasilkan (m3) 250.00 700.00 - - 687.50 - - 1,637.50 233.93 1,500.00
16%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 100.00 250.00 - - 250.00 - - 600.00 85.71
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 125.00 116.67 #DIV/0! #DIV/0! 107.14 #DIV/0! #DIV/0! 113.58 300.00
produktivitas Per Jam kalender (m3 / jam) 38%

687.50 6.42 107.14 113.58. 327.50 18.194.44


Realisasi Progres Pengerukan Area A sd Minggu ke 162

Progres Realisasi
Kontrak Luasan Minggu Ke - 161 Minggu Ke - 162 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 421,087.59 96,338.03 79.31% 1,637.50 600.00 0.49% 422,725.09 96,938.03 79.80%
KUMULATIF TERHADAP KONTRAK 94,745.88 79.80%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 222,571.90 83.13% 600.00 0.22% 223,171.90 83.35%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 113,240.50 m3 425,419.30
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 33,584.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c1 area 1
Sisa Durasi : 20.00 hari 6,235.50 m3
Volume Didapat : 50,347.10 m3 2,234.00 m2
Luasan Didapat : 31,956.11 m2 sisa kubikasi 30,164.50 182,696.68 m3
estimasi 20.11
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/26/21
Volume Material yg Didapat Minggu Ini (V) : 1,637.50 M3
Konversi Luasan yg Didapat (L) : 600.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 163 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
18-Jul-20 19-Jul-20 20-Jul-20 21-Jul-20 22-Jul-20 23-Jul-20 24-Jul-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 169.00 173.00 173.00 175.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 173.00 173.00 175.00 177.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan 4.00 - 2.00 2.00 - 3.00 11.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 5 5 0 0 4 45 2 30 0 0 0 0 7 40 18.00 120.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 5.08 0.00 4.75 2.50 0.00 0.00 7.67 20.00 - 2.86 12.00
1.00 0.00 1.00 1.00 0.00 0.00 1.00 4.00

C. Kedalaman Pengerukan 24%


1 Rata - Rata Level Eksisting (m) - 10.00 - - 7.00 - 10.00 - - - 9.00
2 Rata - Rata Level Dikeruk (m) - 13.55 - - 10.00 - 13.00 - - - 12.50
3 Rata - Rata Ketebalan yg Dikeruk (m) 3.55 - 3.00 3.00 - - 3.50 13.05 2.18

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 4.00 - 2.00 2.00 - - 3.00 11.00 1.57
3 Ketebalan Area yg Dikeruk (m) 3.55 - 3.00 3.00 - - 3.50 13.05 1.86
4 Volume Material yg Dihasilkan (m3) 710.00 - 300.00 300.00 - - 525.00 1,835.00 262.14 1,500.00
17%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 200.00 - 100.00 100.00 - - 150.00 550.00 78.57
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 139.67 #DIV/0! 63.16 120.00 #DIV/0! #DIV/0! 68.48 91.75 300.00
produktivitas Per Jam kalender (m3 / jam) 31%

525.00 7.67 68.48 91.75. 367.00 20.388.89


Realisasi Progres Pengerukan Area A sd Minggu ke 162

Progres Realisasi
Kontrak Luasan Minggu Ke - 161 Minggu Ke - 162 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 422,725.09 96,938.03 79.80% 1,835.00 550.00 0.45% 424,560.09 97,488.03 80.26%
KUMULATIF TERHADAP KONTRAK 95,283.44 80.26%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 223,171.90 83.35% 550.00 0.21% 223,721.90 83.56%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 113,438.00 m3 427,833.02
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 33,534.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c1 area 1
Sisa Durasi : 20.00 hari 8,070.50 m3
Volume Didapat : 50,347.10 m3 2,784.00 m2
Luasan Didapat : 31,956.11 m2 sisa kubikasi 28,329.50 180,861.68 m3
estimasi 18.89
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/24/21
Volume Material yg Didapat Minggu Ini (V) : 1,835.00 M3
Konversi Luasan yg Didapat (L) : 550.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 165 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
25-Jul-20 26-Jul-20 27-Jul-20 28-Jul-20 29-Jul-20 30-Jul-20 31-Jul-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 175.00 178.00 181.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 175.00 178.00 181.00 181.00 169.68 171.68 172.00
5 Panjang Hasil Pengerukan 3.00 3.00 3.00 - 2.00 2.00 - 13.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 8 30 11 55 11 15 0 0 5 30 5 5 0 0 40.00 135.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 8.50 11.92 11.25 0.00 5.50 5.08 0.00 42.25 - 6.04 12.00
1.00 1.00 1.00 0.00 1.00 1.00 0.00 5.00

C. Kedalaman Pengerukan 50%


1 Rata - Rata Level Eksisting (m) - 7.00 - 7.00 - 8.00 - - 9.00 - 9.00 -
2 Rata - Rata Level Dikeruk (m) - 12.50 - 12.50 - 13.55 - - 13.55 - 13.00 -
3 Rata - Rata Ketebalan yg Dikeruk (m) 5.50 5.50 5.55 - 4.55 4.00 - 25.10 4.18

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 3.00 3.00 3.00 - 2.00 2.00 - 13.00 1.86
3 Ketebalan Area yg Dikeruk (m) 5.50 5.50 5.55 - 4.55 4.00 - 25.10 3.59
4 Volume Material yg Dihasilkan (m3) 825.00 825.00 832.50 - 455.00 400.00 - 3,337.50 476.79 1,500.00
32%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 150.00 150.00 150.00 - 100.00 100.00 - 650.00 92.86
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 97.06 69.23 74.00 #DIV/0! 82.73 78.69 #DIV/0! 78.99 300.00
produktivitas Per Jam kalender (m3 / jam) 26%

455.00 5.50 82.73 78.99. 667.50 37.083.33


Realisasi Progres Pengerukan Area A sd Minggu ke 162

Progres Realisasi
Kontrak Luasan Minggu Ke - 161 Minggu Ke - 162 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 424,560.09 97,488.03 80.26% 3,337.50 650.00 0.54% 427,897.59 98,138.03 80.79%
KUMULATIF TERHADAP KONTRAK 95,918.74 80.79%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 223,721.90 83.56% 650.00 0.24% 224,371.90 83.80%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 114,940.50 m3 430,685.59
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 33,634.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c1 area 1
Sisa Durasi : 20.00 hari 11,408.00 m3
Volume Didapat : 50,347.10 m3 3,434.00 m2
Luasan Didapat : 31,956.11 m2 sisa kubikasi 24,992.00 177,524.18 m3
estimasi 19.22
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/25/21
Volume Material yg Didapat Minggu Ini (V) : 3,337.50 M3
Konversi Luasan yg Didapat (L) : 650.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 166 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
01-Aug-20 02-Aug-20 03-Aug-20 04-Aug-20 05-Aug-20 06-Aug-20 07-Aug-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 175.00 177.00 180.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 175.00 177.00 180.00 184.00 169.68 173.68 172.00
5 Panjang Hasil Pengerukan 3.00 2.00 3.00 4.00 5.00 4.00 2.00 23.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 8 0 7 0 11 0 13 40 10 25 8 10 6 45 63.00 120.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 8.00 7.00 11.00 13.67 10.42 8.17 6.75 65.00 1.00 9.29 12.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 7.00

C. Kedalaman Pengerukan 77%


1 Rata - Rata Level Eksisting (m) - 8.00 - 7.00 - 7.00 - 8.00 - 10.00 - 9.00 - 9.00
2 Rata - Rata Level Dikeruk (m) - 12.50 - 12.50 - 13.55 - 13.00 - 13.55 - 13.55 - 12.00
3 Rata - Rata Ketebalan yg Dikeruk (m) 4.50 5.50 6.55 5.00 3.55 4.55 3.00 32.65 5.44

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 3.00 2.00 3.00 4.00 5.00 4.00 2.00 23.00 3.29
3 Ketebalan Area yg Dikeruk (m) 4.50 5.50 6.55 5.00 3.55 4.55 3.00 32.65 4.66
4 Volume Material yg Dihasilkan (m3) 675.00 550.00 982.50 1,000.00 887.50 910.00 300.00 5,305.00 757.86 1,300.00
58%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 150.00 100.00 150.00 200.00 250.00 200.00 100.00 1,150.00 164.29
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 84.38 78.57 89.32 73.17 85.20 111.43 44.44 81.62 300.00
produktivitas Per Jam kalender (m3 / jam) 27%

887.50 10.42 85.20 81.62. 1,061.00 58.944.44


Realisasi Progres Pengerukan Area A sd Minggu ke 166

Progres Realisasi
Kontrak Luasan Minggu Ke - 165 Minggu Ke - 166 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 427,897.59 98,138.03 80.79% 5,305.00 1,150.00 0.95% 433,202.59 99,288.03 81.74%
KUMULATIF TERHADAP KONTRAK 97,042.74 81.74%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 224,371.90 83.80% 1,150.00 0.43% 225,521.90 84.23%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 116,908.00 m3 435,732.44
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 34,134.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c1 area 1
Sisa Durasi : 20.00 hari 16,713.00 m3
Volume Didapat : 50,347.10 m3 4,584.00 m2
Luasan Didapat : 31,956.11 m2 sisa kubikasi 19,687.00 172,219.18 m3
estimasi 15.14
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/21/21
Volume Material yg Didapat Minggu Ini (V) : 5,305.00 M3
Konversi Luasan yg Didapat (L) : 1,150.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 167 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
08-Aug-20 09-Aug-20 10-Aug-20 11-Aug-20 12-Aug-20 13-Aug-20 14-Aug-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 172.00 172.00 172.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 172.00 172.00 172.00 172.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan - - - - 1.00 - 1.00 2.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 2 0 0 0 1 0 3.00 -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 2.00 0.00 1.00 3.00 - 0.43 12.00
0.00 0.00 0.00 0.00 1.00 0.00 1.00 2.00

C. Kedalaman Pengerukan 4%
1 Rata - Rata Level Eksisting (m) - - - - - 10.00 - - 9.00
2 Rata - Rata Level Dikeruk (m) - - - - - 11.50 - - 10.00
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - 1.50 - 1.00 2.50 0.42

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - 1.00 - 1.00 2.00 0.29
3 Ketebalan Area yg Dikeruk (m) - - - - 1.50 - 1.00 2.50 0.36
4 Volume Material yg Dihasilkan (m3) - - - - 75.00 - 50.00 125.00 17.86 1,300.00
1%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - 50.00 - 50.00 100.00 14.29
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! 37.50 #DIV/0! 50.00 41.67 300.00
produktivitas Per Jam kalender (m3 / jam) 14%

75.00 2.00 37.50 41.67. 25.00 1.388.89


Realisasi Progres Pengerukan Area A sd Minggu ke 167

Progres Realisasi
Kontrak Luasan Minggu Ke - 166 Minggu Ke - 167 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 433,202.59 99,288.03 81.74% 125.00 100.00 0.08% 433,327.59 99,388.03 81.82%
KUMULATIF TERHADAP KONTRAK 97,140.48 81.82%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 225,521.90 84.23% 100.00 0.04% 225,621.90 84.27%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 111,728.00 m3 436,171.30
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 33,084.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c1 area 1
Sisa Durasi : 20.00 hari 16,838.00 m3
Volume Didapat : 50,347.10 m3 4,684.00 m2
Luasan Didapat : 31,956.11 m2 sisa kubikasi 19,562.00 172,344.18 m3
estimasi 15.05
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/21/21
Volume Material yg Didapat Minggu Ini (V) : 125.00 M3
Konversi Luasan yg Didapat (L) : 100.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 168 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
15-Aug-20 16-Aug-20 17-Aug-20 18-Aug-20 19-Aug-20 20-Aug-20 21-Aug-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 175.00 179.00 179.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 175.00 179.00 179.00 179.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan 3.00 4.00 - - 2.00 - - 9.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 11 0 11 0 0 0 0 0 5 5 0 0 0 0 27.00 5.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 11.00 11.00 0.00 0.00 5.08 0.00 0.00 27.08 - 3.87 12.00
1.00 1.00 0.00 0.00 1.00 0.00 0.00 3.00

C. Kedalaman Pengerukan 32%


1 Rata - Rata Level Eksisting (m) - 9.00 - 9.00 - - - 9.00 - -
2 Rata - Rata Level Dikeruk (m) - 13.00 - 13.00 - - - 11.50 - -
3 Rata - Rata Ketebalan yg Dikeruk (m) 4.00 4.00 - - 2.50 - - 10.50 1.75

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 3.00 4.00 - - 2.00 - - 9.00 1.29
3 Ketebalan Area yg Dikeruk (m) 4.00 4.00 - - 2.50 - - 10.50 1.50
4 Volume Material yg Dihasilkan (m3) 600.00 800.00 - - 250.00 - - 1,650.00 235.71 1,300.00
18%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 150.00 200.00 - - 100.00 - - 450.00 64.29
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 54.55 72.73 #DIV/0! #DIV/0! 49.18 #DIV/0! #DIV/0! 60.92 300.00
produktivitas Per Jam kalender (m3 / jam) 20%

250.00 5.08 49.18 60.92. 330.00 18.333.33


Realisasi Progres Pengerukan Area A sd Minggu ke 168

Progres Realisasi
Kontrak Luasan Minggu Ke - 167 Minggu Ke - 168 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 433,327.59 99,388.03 81.82% 1,650.00 450.00 0.37% 434,977.59 99,838.03 82.19%
KUMULATIF TERHADAP KONTRAK 97,580.30 82.19%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 225,621.90 84.27% 450.00 0.17% 226,071.90 84.43%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 pengerukan stl dock
Luasan 121,470.39 M2 113,253.00 m3 438,146.15
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 33,434.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%

Target Produktivitas Per jam : 179.81 m3 / jam


Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c1 area 1
Sisa Durasi : 20.00 hari 18,488.00 m3
Volume Didapat : 50,347.10 m3 5,134.00 m2
Luasan Didapat : 31,956.11 m2 sisa kubikasi 17,912.00 173,994.18 m3
estimasi 13.78
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/19/21
Volume Material yg Didapat Minggu Ini (V) : 1,650.00 M3
Konversi Luasan yg Didapat (L) : 450.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 169 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
22-Aug-20 23-Aug-20 24-Aug-20 25-Aug-20 26-Aug-20 27-Aug-20 28-Aug-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 172.00 172.00 172.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 172.00 172.00 172.00 172.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan 0%
1 Rata - Rata Level Eksisting (m) - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - 1,300.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!

- - #DIV/0! #DIV/0! - -
Realisasi Progres Pengerukan Area A sd Minggu ke 168

Progres Realisasi
Kontrak Luasan Minggu Ke - 167 Minggu Ke - 168 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 434,977.59 99,838.03 82.19% - - 0.00% 434,977.59 99,838.03 82.19%
KUMULATIF TERHADAP KONTRAK 97,580.30 82.19%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 226,071.90 84.43% - 0.00% 226,071.90 84.43%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 700000 pengerukan stl dock
Luasan 121,470.39 M2 166918.720.00 111,603.00 m3 438,146.15
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 32,984.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%
21998
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area c1 area 1
Sisa Durasi : 20.00 hari 16,838.00 m3
Volume Didapat : 50,347.10 m3 4,684.00 m2
Luasan Didapat : 31,956.11 m2 sisa kubikasi 19,562.00 173,994.18 m3
estimasi 15.05
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/21/21
Volume Material yg Didapat Minggu Ini (V) : - M3 5012.567.01
Konversi Luasan yg Didapat (L) : - M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 170 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
29-Aug-20 30-Aug-20 31-Aug-20 01-Sep-20 02-Sep-20 03-Sep-20 04-Sep-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 172.00 172.00 172.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 172.00 172.00 172.00 172.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan 0%
1 Rata - Rata Level Eksisting (m) - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - 1,300.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!

- - #DIV/0! #DIV/0! - -
Realisasi Progres Pengerukan Area A sd Minggu ke 170

Progres Realisasi
Kontrak Luasan Minggu Ke - 169 Minggu Ke - 170 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 434,977.59 99,838.03 82.19% - - 0.00% 434,977.59 99,838.03 82.19%
KUMULATIF TERHADAP KONTRAK 97,580.30 82.19%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 226,071.90 84.43% - 0.00% 226,071.90 84.43%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 700000 pengerukan stl dock
Luasan 121,470.39 M2 166918.720.00 111,603.00 m3 438,146.15
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 32,984.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%
21998
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 20000 area c1 area 1
Sisa Durasi : 20.00 hari 4557.293.40 16,838.00 m3
Volume Didapat : 50,347.10 m3 48,000.00 4,684.00 m2
Luasan Didapat : 31,956.11 m2 10937.5041644681 sisa kubikasi 19,562.00 173,994.18 m3
estimasi 15.05
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/21/21
Volume Material yg Didapat Minggu Ini (V) : - M3 5012.567.01
Konversi Luasan yg Didapat (L) : - M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 171 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
05-Sep-20 06-Sep-20 07-Sep-20 08-Sep-20 09-Sep-20 10-Sep-20 11-Sep-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 172.00 172.00 172.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 172.00 172.00 172.00 172.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan 0%
1 Rata - Rata Level Eksisting (m) - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - 1,300.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!

- - #DIV/0! #DIV/0! - -
Realisasi Progres Pengerukan Area A sd Minggu ke 171

Progres Realisasi
Kontrak Luasan Minggu Ke - 170 Minggu Ke - 171 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 434,977.59 99,838.03 82.19% - - 0.00% 434,977.59 99,838.03 82.19%
KUMULATIF TERHADAP KONTRAK 97,580.30 82.19%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 226,071.90 84.43% - 0.00% 226,071.90 84.43%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 700000 pengerukan stl dock
Luasan 121,470.39 M2 166918.720.00 111,603.00 m3 438,146.15
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 32,984.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%
21998
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 20000 area c1 area 1
Sisa Durasi : 20.00 hari 4557.293.40 16,838.00 m3
Volume Didapat : 50,347.10 m3 48,000.00 4,684.00 m2
Luasan Didapat : 31,956.11 m2 10937.5041644681 sisa kubikasi 19,562.00 173,994.18 m3
estimasi 15.05
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/21/21
Volume Material yg Didapat Minggu Ini (V) : - M3 5012.567.01
Konversi Luasan yg Didapat (L) : - M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 172 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
12-Sep-20 13-Sep-20 14-Sep-20 15-Sep-20 16-Sep-20 17-Sep-20 18-Sep-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 172.00 172.00 172.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 172.00 172.00 172.00 172.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan 0%
1 Rata - Rata Level Eksisting (m) - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - 1,300.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!

- - #DIV/0! #DIV/0! - -
Realisasi Progres Pengerukan Area A sd Minggu ke 172

Progres Realisasi
Kontrak Luasan Minggu Ke - 171 Minggu Ke - 172 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 434,977.59 99,838.03 82.19% - - 0.00% 434,977.59 99,838.03 82.19%
KUMULATIF TERHADAP KONTRAK 97,580.30 82.19%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 226,071.90 84.43% - 0.00% 226,071.90 84.43%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 700000 pengerukan stl dock
Luasan 121,470.39 M2 166918.720.00 111,603.00 m3 438,146.15
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 32,984.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%
21998
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 20000 area c1 area 1
Sisa Durasi : 20.00 hari 4557.293.40 16,838.00 m3
Volume Didapat : 50,347.10 m3 48,000.00 4,684.00 m2
Luasan Didapat : 31,956.11 m2 10937.5041644681 sisa kubikasi 19,562.00 173,994.18 m3
estimasi 15.05
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/21/21
Volume Material yg Didapat Minggu Ini (V) : - M3 5012.567.01
Konversi Luasan yg Didapat (L) : - M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 173 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
19-Sep-20 20-Sep-20 21-Sep-20 22-Sep-20 23-Sep-20 24-Sep-20 25-Sep-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 172.00 172.00 172.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 172.00 172.00 172.00 172.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan 0%
1 Rata - Rata Level Eksisting (m) - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - 1,300.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!

- - #DIV/0! #DIV/0! - -
Realisasi Progres Pengerukan Area A sd Minggu ke 173

Progres Realisasi
Kontrak Luasan Minggu Ke - 172 Minggu Ke - 173 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 434,977.59 99,838.03 82.19% - - 0.00% 434,977.59 99,838.03 82.19%
KUMULATIF TERHADAP KONTRAK 97,580.30 82.19%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 226,071.90 84.43% - 0.00% 226,071.90 84.43%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 700000 pengerukan stl dock
Luasan 121,470.39 M2 166918.720.00 111,603.00 m3 438,146.15
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 32,984.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%
21998
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 20000 area c1 area 1
Sisa Durasi : 20.00 hari 4557.293.40 16,838.00 m3
Volume Didapat : 50,347.10 m3 48,000.00 4,684.00 m2
Luasan Didapat : 31,956.11 m2 10937.5041644681 sisa kubikasi 19,562.00 173,994.18 m3
estimasi 15.05
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/21/21
Volume Material yg Didapat Minggu Ini (V) : - M3 5012.567.01
Konversi Luasan yg Didapat (L) : - M2
Realisasi Progres Pengerukan Area A sd Minggu ke 173

Progres Realisasi
Kontrak Luasan Minggu Ke - 151 Minggu Ke - 152 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 451,714.59 102,927.32 84.73% - - 0.00% 451,714.59 102,927.32 84.73%
KUMULATIF TERHADAP KONTRAK 100,599.73 84.73%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 229,161.19 85.59% - 0.00% 229,161.19 85.58%

A. Target Pengerukan Termijn 6 hasil baty


Volume 533,081.28 M3
Luasan 121,470.39 M2 79.77%
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 82.76% volume terkeruk baty 3 sept
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 171,702.85

Target Produktivitas Per jam : 179.81 m3 / jam 18,543.07


Rencana Jam Kerja : 14.00 jam / hari 81,367
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area 2
Sisa Durasi : 20.00 hari 47.15% 35.61% 361,378.43
Volume Didapat : 50,347.10 m3 82,345.38
Luasan Didapat : 31,956.11 m2 95,338.03 m2
418,397.59 m3
B. Realisasi Minggu Ini
Realisasi Pengerukan Minggu Ini 102927.322.81 m2
Volume Material yg Didapat Minggu Ini (V) : - M3 451714.590.65 m3
Konversi Luasan yg Didapat (L) : - M2
68,317.00 m3
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 174 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
26-Sep-20 27-Sep-20 28-Sep-20 29-Sep-20 30-Sep-20 01-Oct-20 02-Oct-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 172.00 172.00 172.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 172.00 172.00 172.00 172.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan 0%
1 Rata - Rata Level Eksisting (m) - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - 1,300.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!

- - #DIV/0! #DIV/0! - -
Realisasi Progres Pengerukan Area A sd Minggu ke 174

Progres Realisasi
Kontrak Luasan Minggu Ke - 173 Minggu Ke - 174 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 451,714.59 102,927.32 84.73% - - 0.00% 418,397.59 95,338.03 78.49%
KUMULATIF TERHADAP KONTRAK 93,182.06 78.49%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 229,161.19 85.59% - 0.00% 221,571.90 82.75%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 700000 pengerukan stl dock
Luasan 121,470.39 M2 166918.720.00 111,603.00 m3 418,397.59
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 32,984.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%
21998
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 20000 area c1 area 1
Sisa Durasi : 20.00 hari 4557.293.40 16,838.00 m3
Volume Didapat : 50,347.10 m3 48,000.00 4,684.00 m2
Luasan Didapat : 31,956.11 m2 10937.5041644681 sisa kubikasi 19,562.00 173,994.18 m3
estimasi 15.05
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/21/21
Volume Material yg Didapat Minggu Ini (V) : - M3 5012.567.01
Konversi Luasan yg Didapat (L) : - M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 174 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
03-Oct-20 04-Oct-20 05-Oct-20 06-Oct-20 07-Oct-20 08-Oct-20 09-Oct-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 172.00 172.00 172.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 172.00 172.00 172.00 172.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan 0%
1 Rata - Rata Level Eksisting (m) - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - 1,300.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!

- - #DIV/0! #DIV/0! - -
Realisasi Progres Pengerukan Area A sd Minggu ke 175

Progres Realisasi
Kontrak Luasan Minggu Ke - 174 Minggu Ke - 175 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 418,397.59 95,338.03 78.49% - - 0.00% 418,397.59 95,338.03 78.49%
KUMULATIF TERHADAP KONTRAK 93,182.06 78.49%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 221,571.90 82.75% - 0.00% 221,571.90 82.75%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 700000 pengerukan stl dock
Luasan 121,470.39 M2 166918.720.00 111,603.00 m3 418,397.59
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 32,984.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%
21998
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 20000 area c1 area 1
Sisa Durasi : 20.00 hari 4557.293.40 16,838.00 m3
Volume Didapat : 50,347.10 m3 48,000.00 4,684.00 m2
Luasan Didapat : 31,956.11 m2 10937.5041644681 sisa kubikasi 19,562.00 173,994.18 m3
estimasi 15.05
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/21/21
Volume Material yg Didapat Minggu Ini (V) : - M3 5012.567.01
Konversi Luasan yg Didapat (L) : - M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 176 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
10-Oct-20 11-Oct-20 12-Oct-20 13-Oct-20 14-Oct-20 15-Oct-20 16-Oct-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 172.00 172.00 172.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 172.00 172.00 172.00 172.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan 0%
1 Rata - Rata Level Eksisting (m) - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - 1,300.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!

- - #DIV/0! #DIV/0! - -
Realisasi Progres Pengerukan Area A sd Minggu ke 176

Progres Realisasi
Kontrak Luasan Minggu Ke - 175 Minggu Ke - 176 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 418,397.59 95,338.03 78.49% - - 0.00% 418,397.59 95,338.03 78.49%
KUMULATIF TERHADAP KONTRAK 93,182.06 78.49%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 221,571.90 82.75% - 0.00% 221,571.90 82.75%

A. Target Pengerukan Termijn 6


Volume 533,081.28 M3 700000 pengerukan stl dock
Luasan 121,470.39 M2 166918.720.00 111,603.00 m3 418,397.59
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 32,984.00 m2
Rasio Luas CCO Terhadap Kntrak Awal 100.00%
21998
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 20000 area c1 area 1
Sisa Durasi : 20.00 hari 4557.293.40 16,838.00 m3
Volume Didapat : 50,347.10 m3 48,000.00 4,684.00 m2
Luasan Didapat : 31,956.11 m2 10937.5041644681 sisa kubikasi 19,562.00 173,994.18 m3
estimasi 15.05
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/21/21
Volume Material yg Didapat Minggu Ini (V) : - M3 5012.567.01
Konversi Luasan yg Didapat (L) : - M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 177 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
17-Oct-20 18-Oct-20 19-Oct-20 20-Oct-20 21-Oct-20 22-Oct-20 23-Oct-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 172.00 172.00 172.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 172.00 172.00 172.00 172.00 169.68 171.68 172.00
5 Panjang Hasil Pengerukan - - - - 6.00 2.00 1.00 9.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 8 10 3 30 2 30 13.00 70.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 8.17 3.50 2.50 14.17 - 2.02 12.00
0.00 0.00 0.00 0.00 1.00 1.00 1.00 3.00

C. Kedalaman Pengerukan 17%


1 Rata - Rata Level Eksisting (m) - - - - - 11.00 - 10.00 - 10.00
2 Rata - Rata Level Dikeruk (m) - - - - - 13.55 - 11.00 - 11.00
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - 2.55 1.00 1.00 4.55 0.76

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - 6.00 2.00 1.00 9.00 1.29
3 Ketebalan Area yg Dikeruk (m) - - - - 2.55 1.00 1.00 4.55 0.65
4 Volume Material yg Dihasilkan (m3) - - - - 765.00 100.00 50.00 915.00 130.71 1,300.00
10%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - 300.00 100.00 50.00 450.00 64.29
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! 93.67 28.57 20.00 64.59 300.00
produktivitas Per Jam kalender (m3 / jam) 22%

50.00 2.50 20.00 64.59. 183.00 10.166.67


Realisasi Progres Pengerukan Area A sd Minggu ke 177

Progres Realisasi
Kontrak Luasan Minggu Ke - 176 Minggu Ke - 177 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 418,397.59 95,338.03 78.49% 915.00 450.00 0.37% 419,312.59 95,788.03 78.86%
KUMULATIF TERHADAP KONTRAK 93,621.89 78.86%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 221,571.90 82.75% 450.00 0.17% 222,021.90 82.92%

pengerukan setelah maintenance lama


A. Target Pengerukan Termijn 6 915.00 m3
Volume 533,081.28 M3 700000 450.00 m2
Luasan 121,470.39 M2 166918.720.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 sisa volume baty 3 sept (area 1&2)
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 170,787.85
21998
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 20000 area c1
Sisa Durasi : 20.00 hari 4557.293.40 17,753.00 m3
Volume Didapat : 50,347.10 m3 48,000.00 5,134.00 m2
Luasan Didapat : 31,956.11 m2 10937.5041644681 sisa kubikasi 18,647.00
estimasi 14.34
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/20/21
Volume Material yg Didapat Minggu Ini (V) : 915.00 M3 5012.567.01
Konversi Luasan yg Didapat (L) : 450.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 178 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
24-Oct-20 25-Oct-20 26-Oct-20 27-Oct-20 28-Oct-20 29-Oct-20 30-Oct-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 172.00 172.00 180.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 172.00 172.00 180.00 184.00 169.68 175.68 172.00
5 Panjang Hasil Pengerukan - - 8.00 4.00 6.00 6.00 4.00 28.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 9 35 5 15 8 40 9 30 10 0 41.00 120.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 9.58 5.25 8.67 9.50 10.00 43.00 - 6.14 12.00
0.00 0.00 1.00 1.00 1.00 1.00 1.00 5.00

C. Kedalaman Pengerukan 51%


1 Rata - Rata Level Eksisting (m) - - - 8.00 - 8.00 - 5.00 - 9.00 - 6.00
2 Rata - Rata Level Dikeruk (m) - - - 13.55 - 10.00 - 9.00 - 12.00 - 11.00
3 Rata - Rata Ketebalan yg Dikeruk (m) - - 5.55 2.00 4.00 3.00 5.00 19.55 3.26

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - 8.00 4.00 6.00 6.00 4.00 28.00 4.00
3 Ketebalan Area yg Dikeruk (m) - - 5.55 2.00 4.00 3.00 5.00 19.55 2.79
4 Volume Material yg Dihasilkan (m3) - - 2,220.00 400.00 1,200.00 900.00 1,000.00 5,720.00 817.14 1,300.00
63%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - 400.00 200.00 300.00 300.00 200.00 1,400.00 200.00
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! 231.65 76.19 138.46 94.74 100.00 133.02 300.00
produktivitas Per Jam kalender (m3 / jam) 44%

900.00 9.50 94.74 133.02. 1,144.00 63.555.56


Realisasi Progres Pengerukan Area A sd Minggu ke 178

Progres Realisasi
Kontrak Luasan Minggu Ke - 177 Minggu Ke - 178 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 419,312.59 95,788.03 78.86% 5,720.00 1,400.00 1.15% 425,032.59 97,188.03 80.01%
KUMULATIF TERHADAP KONTRAK 94,990.23 80.01%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 222,021.90 82.92% 1,400.00 0.52% 223,421.90 83.45%

pengerukan setelah maintenance lama


A. Target Pengerukan Termijn 6 6,635.00 m3
Volume 533,081.28 M3 700000 1,850.00 m2
Luasan 121,470.39 M2 166918.720.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 sisa volume baty 3 sept (area 1&2)
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 165,067.85
21998 sisa volume area 1
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000 147,072.18
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 20000 area c1
Sisa Durasi : 20.00 hari 4557.293.40 22,558.00 m3
Volume Didapat : 50,347.10 m3 48,000.00 6,084.00 m2
Luasan Didapat : 31,956.11 m2 10937.5041644681 sisa kubikasi 13,842.00
estimasi 10.65
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/16/21
Volume Material yg Didapat Minggu Ini (V) : 5,720.00 M3 5012.567.01
Konversi Luasan yg Didapat (L) : 1,400.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 179 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
31-Oct-20 01-Nov-20 02-Nov-20 03-Nov-20 04-Nov-20 05-Nov-20 06-Nov-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 174.00 178.00 182.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 174.00 178.00 182.00 182.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan 2.00 4.00 4.00 - - - - 10.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 6 10 3 20 4 25 0 0 0 0 0 0 0 0 13.00 55.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 6.17 3.33 4.42 0.00 0.00 0.00 0.00 13.92 - 1.99 12.00
1.00 1.00 1.00 0.00 0.00 0.00 0.00 3.00

C. Kedalaman Pengerukan 17%


1 Rata - Rata Level Eksisting (m) - 11.00 - 4.00 - 6.00 - 8.00 - 12.00 - 9.00 - 6.00
2 Rata - Rata Level Dikeruk (m) - 13.55 - 6.00 - 8.00 - 10.00 - 13.55 - 12.00 - 11.00
3 Rata - Rata Ketebalan yg Dikeruk (m) 2.55 2.00 2.00 2.00 1.55 3.00 5.00 18.10 3.02

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 2.00 4.00 4.00 - - - - 10.00 1.43
3 Ketebalan Area yg Dikeruk (m) 2.55 2.00 2.00 2.00 1.55 3.00 5.00 18.10 2.59
4 Volume Material yg Dihasilkan (m3) 255.00 400.00 400.00 - - - - 1,055.00 150.71 1,300.00
12%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 100.00 200.00 200.00 - - - - 500.00 71.43
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 41.35 120.00 90.57 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 75.81 300.00
produktivitas Per Jam kalender (m3 / jam) 25%

- - #DIV/0! 75.81. 211.00 11.722.22


Realisasi Progres Pengerukan Area A sd Minggu ke 179

Progres Realisasi
Kontrak Luasan Minggu Ke - 178 Minggu Ke - 179 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 425,032.59 97,188.03 80.01% 1,055.00 500.00 0.41% 426,087.59 97,688.03 80.42%
KUMULATIF TERHADAP KONTRAK 95,478.92 80.42%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 223,421.90 83.45% 500.00 0.19% 223,921.90 83.63%

pengerukan setelah maintenance lama


A. Target Pengerukan Termijn 6 7,690.00 m3
Volume 533,081.28 M3 700000 2,350.00 m2
Luasan 121,470.39 M2 166918.720.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 sisa volume baty 3 sept (area 1&2)
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 164,012.85
21998 sisa volume area 1
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000 146,017.18 akumulasi volume
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 20000 area c1 estimasi selesai
Sisa Durasi : 20.00 hari 4557.293.40 17,893.00 m3 112.320.91
Volume Didapat : 50,347.10 m3 48,000.00 5,184.00 m2 10/26/21
Luasan Didapat : 31,956.11 m2 10937.5041644681 sisa kubikasi 18,507.00
estimasi 14.24
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/20/21
Volume Material yg Didapat Minggu Ini (V) : 1,055.00 M3 5012.567.01
Konversi Luasan yg Didapat (L) : 500.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 179 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
07-Nov-20 08-Nov-20 09-Nov-20 10-Nov-20 11-Nov-20 12-Nov-20 13-Nov-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 172.00 172.00 172.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 172.00 172.00 172.00 172.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan 0%
1 Rata - Rata Level Eksisting (m) - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - 1,300.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!

- - #DIV/0! #DIV/0! - -
Realisasi Progres Pengerukan Area A sd Minggu ke 179

Progres Realisasi
Kontrak Luasan Minggu Ke - 178 Minggu Ke - 179 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 426,087.59 97,688.03 80.42% - - 0.00% 426,087.59 97,688.03 80.42%
KUMULATIF TERHADAP KONTRAK 95,478.92 80.42%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 223,921.90 83.63% - 0.00% 223,921.90 83.63%

pengerukan setelah maintenance lama


A. Target Pengerukan Termijn 6 7,690.00 m3
Volume 533,081.28 M3 700000 1,850.00 m2
Luasan 121,470.39 M2 166918.720.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 sisa volume baty 3 sept (area 1&2)
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 164,012.85
21998 sisa volume area 1
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000 146,017.18 akumulasi volume
Rencana Jam Kerja : 14.00 jam / hari 161397.180.00
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 20000 area c1 estimasi selesai
Sisa Durasi : 20.00 hari 4557.293.40 16,838.00 m3 112.320.91
Volume Didapat : 50,347.10 m3 48,000.00 4,684.00 m2 10/26/21
Luasan Didapat : 31,956.11 m2 10937.5041644681 sisa kubikasi 19,562.00
estimasi 15.05
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/21/21
Volume Material yg Didapat Minggu Ini (V) : - M3 5012.567.01
Konversi Luasan yg Didapat (L) : - M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 179 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
14-Nov-20 15-Nov-20 16-Nov-20 17-Nov-20 18-Nov-20 19-Nov-20 20-Nov-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 172.00 172.00 172.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 172.00 172.00 172.00 172.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan 0%
1 Rata - Rata Level Eksisting (m) - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - 1,300.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!

- - #DIV/0! #DIV/0! - -
Realisasi Progres Pengerukan Area A sd Minggu ke 179

Progres Realisasi
Kontrak Luasan Minggu Ke - 178 Minggu Ke - 179 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 426,087.59 97,688.03 80.42% - - 0.00% 426,087.59 97,688.03 80.42%
KUMULATIF TERHADAP KONTRAK 95,478.92 80.42%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 223,921.90 83.63% - 0.00% 223,921.90 83.63%

pengerukan setelah maintenance lama


A. Target Pengerukan Termijn 6 7,690.00 m3
Volume 533,081.28 M3 700000 1,850.00 m2
Luasan 121,470.39 M2 166918.720.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 sisa volume baty 3 sept (area 1&2)
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 164,012.85
21998 sisa volume area 1
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000 146,017.18 akumulasi volume
Rencana Jam Kerja : 14.00 jam / hari 161397.180.00
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 20000 area c1 estimasi selesai
Sisa Durasi : 20.00 hari 4557.293.40 16,838.00 m3 112.320.91
Volume Didapat : 50,347.10 m3 48,000.00 4,684.00 m2 10/26/21
Luasan Didapat : 31,956.11 m2 10937.5041644681 sisa kubikasi 19,562.00
estimasi 15.05
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/21/21
Volume Material yg Didapat Minggu Ini (V) : - M3 5012.567.01
Konversi Luasan yg Didapat (L) : - M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 182 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
21-Nov-20 22-Nov-20 23-Nov-20 24-Nov-20 25-Nov-20 26-Nov-20 27-Nov-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 172.00 172.00 172.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 172.00 172.00 172.00 172.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan 0%
1 Rata - Rata Level Eksisting (m) - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - 1,300.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!

- - #DIV/0! #DIV/0! - -
Realisasi Progres Pengerukan Area A sd Minggu ke 182

Progres Realisasi
Kontrak Luasan Minggu Ke - 181 Minggu Ke - 182 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 426,087.59 97,688.03 80.42% - - 0.00% 426,087.59 97,688.03 80.42%
KUMULATIF TERHADAP KONTRAK 95,478.92 80.42%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 223,921.90 83.63% - 0.00% 223,921.90 83.63%

pengerukan setelah maintenance lama


A. Target Pengerukan Termijn 6 7,690.00 m3
Volume 533,081.28 M3 700000 1,850.00 m2
Luasan 121,470.39 M2 166918.720.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 sisa volume baty 3 sept (area 1&2)
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 164,012.85
21998 sisa volume area 1
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000 146,017.18 akumulasi volume
Rencana Jam Kerja : 14.00 jam / hari 161397.180.00
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 20000 area c1 estimasi selesai
Sisa Durasi : 20.00 hari 4557.293.40 16,838.00 m3 112.320.91
Volume Didapat : 50,347.10 m3 48,000.00 4,684.00 m2 10/26/21
Luasan Didapat : 31,956.11 m2 10937.5041644681 sisa kubikasi 19,562.00
estimasi 15.05
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/21/21
Volume Material yg Didapat Minggu Ini (V) : - M3 5012.567.01
Konversi Luasan yg Didapat (L) : - M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 179 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
28-Nov-20 29-Nov-20 30-Nov-20 01-Dec-20 02-Dec-20 03-Dec-20 04-Dec-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 172.00 172.00 172.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 172.00 172.00 172.00 172.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - -
2 Durasi Waktu Pengerukan Efektif (Desimal) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - 12.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. Kedalaman Pengerukan 0%
1 Rata - Rata Level Eksisting (m) - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - 1,300.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!

- - #DIV/0! #DIV/0! - -
Realisasi Progres Pengerukan Area A sd Minggu ke 183

Progres Realisasi
Kontrak Luasan Minggu Ke - 182 Minggu Ke - 183 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 426,087.59 97,688.03 80.42% - - 0.00% 426,087.59 97,688.03 80.42%
KUMULATIF TERHADAP KONTRAK 95,478.92 80.42%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 223,921.90 83.63% - 0.00% 223,921.90 83.63%

pengerukan setelah maintenance lama


A. Target Pengerukan Termijn 6 7,690.00 m3
Volume 533,081.28 M3 700000 1,850.00 m2
Luasan 121,470.39 M2 166918.720.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 sisa volume baty 3 sept (area 1&2)
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 164,012.85
21998 sisa volume area 1
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000 146,017.18 akumulasi volume
Rencana Jam Kerja : 14.00 jam / hari 161397.180.00
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 20000 area c1 estimasi selesai
Sisa Durasi : 20.00 hari 4557.293.40 16,838.00 m3 112.320.91
Volume Didapat : 50,347.10 m3 48,000.00 4,684.00 m2 10/26/21
Luasan Didapat : 31,956.11 m2 10937.5041644681 sisa kubikasi 19,562.00
estimasi 15.05
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/21/21
Volume Material yg Didapat Minggu Ini (V) : - M3 5012.567.01
Konversi Luasan yg Didapat (L) : - M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 184 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
05-Dec-20 06-Dec-20 07-Dec-20 08-Dec-20 09-Dec-20 10-Dec-20 11-Dec-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 176.00 178.00 178.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 176.00 178.00 178.00 178.00 169.68 173.68 172.00
5 Panjang Hasil Pengerukan 4.00 2.00 - - 4.00 4.00 6.00 20.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 4 45 1 30 0 0 0 0 8 40 7 35 12 0 32.00 150.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 4.75 1.50 0.00 0.00 8.67 7.58 12.00 34.50 - 4.93 12.00
1.00 1.00 0.00 0.00 1.00 1.00 1.00 5.00

C. Kedalaman Pengerukan 41%


1 Rata - Rata Level Eksisting (m) - 5.00 - 9.00 - - 8.00 - 8.00 - 8.00 - 8.00
2 Rata - Rata Level Dikeruk (m) - 9.00 - 10.00 - - 10.00 - 13.55 - 13.55 - 13.55
3 Rata - Rata Ketebalan yg Dikeruk (m) 4.00 1.00 - 2.00 5.55 5.55 5.55 23.65 3.94

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 4.00 2.00 - - 4.00 4.00 6.00 20.00 2.86
3 Ketebalan Area yg Dikeruk (m) 4.00 1.00 - 2.00 5.55 5.55 5.55 23.65 3.38
4 Volume Material yg Dihasilkan (m3) 800.00 100.00 - - 1,110.00 1,110.00 1,665.00 4,785.00 683.57 1,300.00
53%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 200.00 100.00 - - 200.00 200.00 300.00 1,000.00 142.86
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 168.42 66.67 #DIV/0! #DIV/0! 128.08 146.37 138.75 138.70 300.00
produktivitas Per Jam kalender (m3 / jam) 46%

1,110.00 7.58 146.37 138.70. 957.00 53.166.67


Realisasi Progres Pengerukan Area A sd Minggu ke 184

Progres Realisasi
Kontrak Luasan Minggu Ke - 183 Minggu Ke - 184 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 426,087.59 97,688.03 80.42% 4,785.00 1,000.00 0.82% 430,872.59 98,688.03 81.24%
KUMULATIF TERHADAP KONTRAK 96,456.31 81.24%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 223,921.90 83.63% 1,000.00 0.37% 224,921.90 84.01%

pengerukan setelah maintenance lama


A. Target Pengerukan Termijn 6 12,475.00 m3
Volume 533,081.28 M3 700000 2,850.00 m2
Luasan 121,470.39 M2 166918.720.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 sisa volume baty 3 sept (area 1&2)
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 159,227.85
21998 sisa volume area 1
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000 141,232.18 akumulasi volume
Rencana Jam Kerja : 14.00 jam / hari 166182.180.00
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 20000 area c1 estimasi selesai
Sisa Durasi : 20.00 hari 4557.293.40 21,623.00 m3 108.640.14
Volume Didapat : 50,347.10 m3 48,000.00 5,684.00 m2 10/22/21
Luasan Didapat : 31,956.11 m2 10937.5041644681 sisa kubikasi 14,777.00
estimasi 11.37
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/17/21
Volume Material yg Didapat Minggu Ini (V) : 4,785.00 M3 5012.567.01
Konversi Luasan yg Didapat (L) : 1,000.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 185 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
12-Dec-20 13-Dec-20 14-Dec-20 15-Dec-20 16-Dec-20 17-Dec-20 18-Dec-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 176.00 180.00 180.00 184.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 176.00 180.00 182.00 184.00 185.00 169.68 175.68 172.00
5 Panjang Hasil Pengerukan 4.00 4.00 2.00 4.00 1.00 4.00 6.00 - 25.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 5 15 8 10 6 15 3 20 6 35 9 50 0 30 37.00 175.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 5.25 8.17 6.25 3.33 6.58 9.83 0.50 39.92 - 5.70 12.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 7.00

C. Kedalaman Pengerukan 48%


1 Rata - Rata Level Eksisting (m) - 9.00 - 7.50 - 11.00 - 8.00 - 7.00 - 8.00 - 8.00 -
2 Rata - Rata Level Dikeruk (m) - 13.55 - 12.50 - 13.55 - 13.55 - 8.00 - 12.00 - 12.00 -
3 Rata - Rata Ketebalan yg Dikeruk (m) 4.55 5.00 2.55 5.55 1.00 4.00 4.00 - 26.65 4.44

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 4.00 4.00 2.00 4.00 1.00 4.00 6.00 - 25.00 3.57
3 Ketebalan Area yg Dikeruk (m) 4.55 5.00 2.55 5.55 1.00 4.00 4.00 - 26.65 3.81
4 Volume Material yg Dihasilkan (m3) 910.00 1,000.00 255.00 1,110.00 50.00 800.00 1,200.00 - 5,325.00 760.71 1,300.00
59%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 200.00 200.00 100.00 200.00 50.00 200.00 300.00 - 1,250.00 178.57
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 173.33 153.67 177.60 15.00 121.52 122.03 - 133.40 300.00
produktivitas Per Jam kalender (m3 / jam) 44%

1,200.00 9.83 122.03 133.40. 1,065.00 59.166.67


Realisasi Progres Pengerukan Area A sd Minggu ke 185

Progres Realisasi
Kontrak Luasan Minggu Ke - 184 Minggu Ke - 185 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 426,087.59 97,688.03 80.42% 5,325.00 1,250.00 1.03% 431,412.59 98,938.03 81.45%
KUMULATIF TERHADAP KONTRAK 96,700.65 81.45%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 223,921.90 83.63% 1,250.00 0.47% 225,171.90 84.10%

pengerukan setelah maintenance lama


A. Target Pengerukan Termijn 6 17,800.00 m3
Volume 533,081.28 M3 700000 4,100.00 m2
Luasan 121,470.39 M2 166918.720.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 sisa volume baty 3 sept (area 1&2)
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 153,902.85
21998 sisa volume area 1
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000 135,907.18 akumulasi sisa volume
Rencana Jam Kerja : 14.00 jam / hari 135907.180.00
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 20000 area c1 estimasi selesai
Sisa Durasi : 20.00 hari 4557.293.40 22,163.00 m3 135.907.18
Volume Didapat : 50,347.10 m3 48,000.00 5,934.00 m2 11/18/21
Luasan Didapat : 31,956.11 m2 10937.5041644681 sisa kubikasi 14,237.00
estimasi 10.95
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/16/21
Volume Material yg Didapat Minggu Ini (V) : 5,325.00 M3 5012.567.01
Konversi Luasan yg Didapat (L) : 1,250.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 185 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
19-Dec-20 20-Dec-20 21-Dec-20 22-Dec-20 23-Dec-20 24-Dec-20 25-Dec-20 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 176.00 180.00 180.00 186.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 176.00 180.00 180.00 186.00 194.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan 4.00 4.00 - 6.00 8.00 - - 2.00 24.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 8 45 8 55 12 0 15 5 0 0 0 30 5 25 48.00 160.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 8.75 8.92 12.00 15.08 0.00 0.50 5.42 50.67 - 7.24 12.00
1.00 1.00 1.00 1.00 0.00 1.00 1.00 6.00

C. Kedalaman Pengerukan 60%


1 Rata - Rata Level Eksisting (m) - 9.00 - 8.00 - - 7.00 - 7.00 - - - 8.00
2 Rata - Rata Level Dikeruk (m) - 13.55 - 13.00 - - 13.00 - 13.00 - - - 10.00
3 Rata - Rata Ketebalan yg Dikeruk (m) 4.55 5.00 - 6.00 6.00 - - 2.00 23.55 3.93

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 4.00 4.00 - 6.00 8.00 - - 2.00 24.00 3.43
3 Ketebalan Area yg Dikeruk (m) 4.55 5.00 - 6.00 6.00 - - 2.00 23.55 3.36
4 Volume Material yg Dihasilkan (m3) 910.00 1,000.00 - 1,800.00 2,400.00 - - 200.00 6,310.00 901.43 1,300.00
69%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 200.00 200.00 - 300.00 400.00 - - 100.00 1,200.00 171.43
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 104.00 112.15 150.00 159.12 #DIV/0! - 36.92 124.54 300.00
produktivitas Per Jam kalender (m3 / jam) 42%

- 0.50 - 124.54. 1,262.00 70.111.11


Realisasi Progres Pengerukan Area A sd Minggu ke 186

Progres Realisasi
Kontrak Luasan Minggu Ke - 185 Minggu Ke - 186 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 431,412.59 98,938.03 81.45% 6,310.00 1,200.00 0.99% 437,722.59 100,138.03 82.44%
KUMULATIF TERHADAP KONTRAK 97,873.52 82.44%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 225,171.90 84.10% 1,200.00 0.45% 226,371.90 84.55%

pengerukan setelah maintenance lama


A. Target Pengerukan Termijn 6 24,110.00 m3
Volume 533,081.28 M3 700000 5,300.00 m2
Luasan 121,470.39 M2 166918.720.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 sisa volume baty 3 sept (area 1&2)
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 147,592.85
21998 sisa volume area 1
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000 129,597.18 akumulasi sisa volume
Rencana Jam Kerja : 14.00 jam / hari 129597.180.00
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 20000 area c1 estimasi selesai
Sisa Durasi : 20.00 hari 4557.293.40 23,148.00 m3 129.597.18
Volume Didapat : 50,347.10 m3 48,000.00 5,884.00 m2 11/12/21
Luasan Didapat : 31,956.11 m2 10937.5041644681 sisa kubikasi 13,252.00
estimasi 10.19
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/16/21
Volume Material yg Didapat Minggu Ini (V) : 6,310.00 M3 5012.567.01
Konversi Luasan yg Didapat (L) : 1,200.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 185 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
26-Dec-20 27-Dec-20 28-Dec-20 29-Dec-20 30-Dec-20 31-Dec-20 01-Jan-21 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 178.00 179.00 179.00 179.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 178.00 179.00 179.00 179.00 179.00 169.68 173.68 172.00
5 Panjang Hasil Pengerukan 6.00 1.00 - - - - 4.00 8.00 19.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 10 40 2 0 0 0 0 0 0 0 4 0 7 10 23.00 50.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 10.67 2.00 0.00 0.00 0.00 4.00 7.17 23.83 - 3.40 12.00
1.00 1.00 0.00 0.00 0.00 1.00 1.00 4.00

C. Kedalaman Pengerukan 28%


1 Rata - Rata Level Eksisting (m) - 8.00 - 8.00 - - - - - 10.00 - 9.00
2 Rata - Rata Level Dikeruk (m) - 13.00 - 9.00 - - - - - 13.55 - 13.55
3 Rata - Rata Ketebalan yg Dikeruk (m) 5.00 1.00 - - - - 3.55 4.55 14.10 2.35

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 6.00 1.00 - - - - 4.00 8.00 19.00 2.71
3 Ketebalan Area yg Dikeruk (m) 5.00 1.00 - - - - 3.55 4.55 14.10 2.01
4 Volume Material yg Dihasilkan (m3) 1,500.00 50.00 - - - - 710.00 1,820.00 4,080.00 582.86 1,300.00
45%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 300.00 50.00 - - - - 200.00 400.00 950.00 135.71
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 140.63 25.00 #DIV/0! #DIV/0! #DIV/0! 177.50 253.95 171.19 300.00
produktivitas Per Jam kalender (m3 / jam) 57%

710.00 4.00 177.50 171.19. 816.00 45.333.33


Realisasi Progres Pengerukan Area A sd Minggu ke 187

Progres Realisasi
Kontrak Luasan Minggu Ke - 186 Minggu Ke - 187 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 437,722.59 100,138.03 82.44% 4,080.00 950.00 0.78% 441,802.59 101,088.03 83.22%
KUMULATIF TERHADAP KONTRAK 98,802.03 83.22%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 226,371.90 84.55% 950.00 0.35% 227,321.90 84.90%

pengerukan setelah maintenance lama


A. Target Pengerukan Termijn 6 28,190.00 m3
Volume 533,081.28 M3 700000 6,250.00 m2
Luasan 121,470.39 M2 166918.720.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 sisa volume baty 3 sept (area 1&2)
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 143,512.85
21998 sisa volume area 1
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000 125,517.18 akumulasi sisa volume
Rencana Jam Kerja : 14.00 jam / hari 125467.180.00
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 20000 area c1 estimasi selesai
Sisa Durasi : 20.00 hari 4557.293.40 20,918.00 m3 125.517.18
Volume Didapat : 50,347.10 m3 48,000.00 5,634.00 m2 11/8/21
Luasan Didapat : 31,956.11 m2 10937.5041644681 sisa kubikasi 15,482.00
estimasi 11.91
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/17/21
Volume Material yg Didapat Minggu Ini (V) : 4,080.00 M3 5012.567.01
Konversi Luasan yg Didapat (L) : 950.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 188 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
02-Jan-21 03-Jan-21 04-Jan-21 05-Jan-21 06-Jan-21 07-Jan-21 08-Jan-21 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 180.00 192.00 192.00 200.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 180.00 192.00 192.00 200.00 208.00 169.68 175.68 172.00
5 Panjang Hasil Pengerukan 8.00 12.00 - 8.00 8.00 6.00 6.00 2.00 50.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 8 0 11 5 10 5 9 0 8 10 6 50 2 15 54.00 85.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 8.00 11.08 10.08 9.00 8.17 6.83 2.25 55.42 - 7.92 10.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 7.00

C. Kedalaman Pengerukan 79%


1 Rata - Rata Level Eksisting (m) - 9.00 - 8.00 - - 9.00 - 9.00 - 7.00 - 11.00 - 9.00
2 Rata - Rata Level Dikeruk (m) - 13.55 - 12.50 - - 13.00 - 12.00 - 11.00 - 13.55 - 10.00
3 Rata - Rata Ketebalan yg Dikeruk (m) 4.55 4.50 - 4.00 3.00 4.00 2.55 1.00 23.60 3.93

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 8.00 12.00 - 8.00 8.00 6.00 6.00 2.00 50.00 7.14
3 Ketebalan Area yg Dikeruk (m) 4.55 4.50 - 4.00 3.00 4.00 2.55 1.00 23.60 3.37
4 Volume Material yg Dihasilkan (m3) 1,820.00 2,700.00 - 1,600.00 1,200.00 1,200.00 765.00 100.00 9,385.00 1,340.71 1,300.00
103%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 400.00 600.00 - 400.00 400.00 300.00 300.00 100.00 2,500.00 357.14
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 227.50 243.61 158.68 133.33 146.94 111.95 44.44 169.35 300.00
produktivitas Per Jam kalender (m3 / jam) 56%

765.00 6.83 111.95 169.35. 1,877.00 104.277.78


Realisasi Progres Pengerukan Area A sd Minggu ke 188

Progres Realisasi
Kontrak Luasan Minggu Ke - 187 Minggu Ke - 188 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 441,802.59 101,088.03 83.22% 9,385.00 2,500.00 2.06% 451,187.59 103,588.03 85.28%
KUMULATIF TERHADAP KONTRAK 101,245.50 85.28%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 227,321.90 84.90% 2,500.00 0.93% 229,821.90 85.84%

pengerukan setelah maintenance lama


A. Target Pengerukan Termijn 6 37,575.00 m3
Volume 533,081.28 M3 700000 8,750.00 m2
Luasan 121,470.39 M2 166918.720.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 sisa volume baty 3 sept (area 1&2)
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 134,127.85
21998 sisa volume area 1
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000 116,132.18 akumulasi sisa volume
Rencana Jam Kerja : 14.00 jam / hari 116082.180.00
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 20000 area c1 estimasi selesai
Sisa Durasi : 20.00 hari 4557.293.40 26,223.00 m3 116.132.18
Volume Didapat : 50,347.10 m3 48,000.00 7,184.00 m2 10/30/21
Luasan Didapat : 31,956.11 m2 10937.5041644681 sisa kubikasi 10,177.00
estimasi 7.83
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/13/21
Volume Material yg Didapat Minggu Ini (V) : 9,385.00 M3 5012.567.01
Konversi Luasan yg Didapat (L) : 2,500.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 189 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
09-Jan-21 10-Jan-21 11-Jan-21 12-Jan-21 13-Jan-21 14-Jan-21 15-Jan-21 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 180.00 186.00 186.00 196.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 180.00 186.00 186.00 196.00 204.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan 8.00 6.00 - 10.00 8.00 8.00 - - 40.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 9 5 5 50 10 15 9 20 3 10 0 0 0 0 36.00 100.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 9.08 5.83 10.25 9.33 3.17 0.00 0.00 37.67 - 5.38 12.00
1.00 1.00 1.00 1.00 1.00 0.00 0.00 5.00

C. Kedalaman Pengerukan 45%


1 Rata - Rata Level Eksisting (m) - 9.00 - 9.00 - - 10.00 - 9.00 - 7.00 - -
2 Rata - Rata Level Dikeruk (m) - 13.55 - 12.50 - - 13.55 - 12.00 - 9.00 - -
3 Rata - Rata Ketebalan yg Dikeruk (m) 4.55 3.50 - 3.55 3.00 2.00 - - 16.60 2.77

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 8.00 6.00 - 10.00 8.00 8.00 - - 40.00 5.71
3 Ketebalan Area yg Dikeruk (m) 4.55 3.50 - 3.55 3.00 2.00 - - 16.60 2.37
4 Volume Material yg Dihasilkan (m3) 1,820.00 1,050.00 - 1,775.00 1,200.00 800.00 - - 6,645.00 949.29 1,300.00
73%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 400.00 300.00 - 500.00 400.00 400.00 - - 2,000.00 285.71
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 200.37 180.00 173.17 128.57 252.63 #DIV/0! #DIV/0! 176.42 300.00
produktivitas Per Jam kalender (m3 / jam) 59%

- - #DIV/0! 176.42. 1,329.00 73.833.33


Realisasi Progres Pengerukan Area A sd Minggu ke 189

Progres Realisasi
Kontrak Luasan Minggu Ke - 187 Minggu Ke - 188 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 451,187.59 103,588.03 85.28% 6,645.00 2,000.00 1.65% 457,832.59 105,588.03 86.92%
KUMULATIF TERHADAP KONTRAK 103,200.27 86.92%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 229,821.90 85.84% 2,000.00 0.75% 231,821.90 86.58%

pengerukan setelah maintenance lama


A. Target Pengerukan Termijn 6 44,220.00 m3
Volume 533,081.28 M3 700000 10,750.00 m2
Luasan 121,470.39 M2 166918.720.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 sisa volume baty 3 sept (area 1&2)
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 127,482.85
21998 sisa volume area 1
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000 109,487.18 akumulasi sisa volume
Rencana Jam Kerja : 14.00 jam / hari 109437.180.00
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 20000 area c1 estimasi selesai
Sisa Durasi : 20.00 hari 4557.293.40 23,483.00 m3 109.487.18
Volume Didapat : 50,347.10 m3 48,000.00 6,684.00 m2 10/23/21
Luasan Didapat : 31,956.11 m2 10937.5041644681 sisa kubikasi 12,917.00
estimasi 9.94
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/15/21
Volume Material yg Didapat Minggu Ini (V) : 6,645.00 M3 5012.567.01
Konversi Luasan yg Didapat (L) : 2,000.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 190 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
16-Jan-21 17-Jan-21 18-Jan-21 19-Jan-21 20-Jan-21 21-Jan-21 22-Jan-21 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 176.00 184.00 190.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 176.00 184.00 190.00 190.00 169.68 175.68 172.00
5 Panjang Hasil Pengerukan 4.00 8.00 - 6.00 - 1.00 6.00 - 25.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 8 25 7 0 5 40 0 0 6 0 2 10 0 0 28.00 75.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 8.42 7.00 5.67 0.00 6.00 2.17 0.00 29.25 - 4.18 12.00
1.00 1.00 1.00 0.00 1.00 1.00 0.00 5.00

C. Kedalaman Pengerukan 35%


1 Rata - Rata Level Eksisting (m) - 11.00 - 12.00 - - 12.00 - - 11.00 - 11.00 -
2 Rata - Rata Level Dikeruk (m) - 13.55 - 13.55 - - 13.55 - - 13.55 - 13.55 -
3 Rata - Rata Ketebalan yg Dikeruk (m) 2.55 1.55 - 1.55 - 2.55 2.55 - 10.75 1.79

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 4.00 8.00 - 6.00 - 1.00 6.00 - 25.00 3.57
3 Ketebalan Area yg Dikeruk (m) 2.55 1.55 - 1.55 - 2.55 2.55 - 10.75 1.54
4 Volume Material yg Dihasilkan (m3) 510.00 620.00 - 465.00 - 127.50 765.00 - 2,487.50 355.36 1,300.00
27%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 200.00 400.00 - 300.00 - 50.00 300.00 - 1,250.00 178.57
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 60.59 88.57 82.06 #DIV/0! 21.25 353.08 #DIV/0! 85.04 300.00
produktivitas Per Jam kalender (m3 / jam) 28%

765.00 2.17 353.08 85.04. 497.50 27.638.89


Realisasi Progres Pengerukan Area A sd Minggu ke 190

Progres Realisasi
Kontrak Luasan Minggu Ke - 189 Minggu Ke - 190 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 457,832.59 105,588.03 86.92% 2,487.50 1,250.00 1.03% 460,320.09 106,838.03 87.95%
KUMULATIF TERHADAP KONTRAK 104,422.00 87.95%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 231,821.90 86.58% 1,250.00 0.47% 233,071.90 87.05%

pengerukan setelah maintenance lama


A. Target Pengerukan Termijn 6 46,707.50 m3
Volume 533,081.28 M3 700000 12,000.00 m2
Luasan 121,470.39 M2 166918.720.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 sisa volume baty 3 sept (area 1&2)
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 124,995.35
21998 sisa volume area 1
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000 106,999.68 akumulasi sisa volume
Rencana Jam Kerja : 14.00 jam / hari 106949.680.00
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 20000 area c1 estimasi selesai
Sisa Durasi : 20.00 hari 4557.293.40 19,325.50 m3 106.999.68
Volume Didapat : 50,347.10 m3 48,000.00 5,934.00 m2 10/20/21
Luasan Didapat : 31,956.11 m2 10937.5041644681 sisa kubikasi 17,074.50
estimasi 13.13
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/19/21
Volume Material yg Didapat Minggu Ini (V) : 2,487.50 M3 5012.567.01
Konversi Luasan yg Didapat (L) : 1,250.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 191 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
23-Jan-21 24-Jan-21 25-Jan-21 26-Jan-21 27-Jan-21 28-Jan-21 29-Jan-21 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 176.00 182.00 182.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 176.00 182.00 182.00 188.00 169.68 170.68 172.00
5 Panjang Hasil Pengerukan 4.00 6.00 - - 6.00 6.00 1.00 4.00 27.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 9 40 6 20 0 0 4 40 5 45 1 0 3 5 28.00 150.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 9.67 6.33 0.00 4.67 5.75 1.00 3.08 30.50 - 4.36 12.00
1.00 1.00 0.00 1.00 1.00 1.00 1.00 6.00

C. Kedalaman Pengerukan 36%


1 Rata - Rata Level Eksisting (m) - 6.50 - 6.10 - - - 5.00 - 8.00 - 12.00 - 6.00
2 Rata - Rata Level Dikeruk (m) - 13.55 - 10.15 - - - 8.00 - 12.00 - 13.00 - 9.00
3 Rata - Rata Ketebalan yg Dikeruk (m) 7.05 4.05 - - 3.00 4.00 1.00 3.00 22.10 3.68

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 4.00 6.00 - - 6.00 6.00 1.00 4.00 27.00 3.86
3 Ketebalan Area yg Dikeruk (m) 7.05 4.05 - - 3.00 4.00 1.00 3.00 22.10 3.16
4 Volume Material yg Dihasilkan (m3) 1,410.00 1,215.00 - - 900.00 1,200.00 50.00 600.00 5,375.00 767.86 1,300.00
59%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 200.00 300.00 - - 300.00 300.00 50.00 200.00 1,350.00 192.86
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 145.86 191.84 #DIV/0! 192.86 208.70 50.00 194.59 176.23 300.00
produktivitas Per Jam kalender (m3 / jam) 59%

50.00 1.00 50.00 176.23. 1,075.00 59.722.22


Realisasi Progres Pengerukan Area A sd Minggu ke 191

Progres Realisasi
Kontrak Luasan Minggu Ke - 190 Minggu Ke - 191 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 460,320.09 106,838.03 87.95% 5,375.00 1,350.00 1.11% 465,695.09 108,188.03 89.07%
KUMULATIF TERHADAP KONTRAK 105,741.48 89.07%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 233,071.90 87.05% 1,350.00 0.50% 234,421.90 87.55%

pengerukan setelah maintenance lama


A. Target Pengerukan Termijn 6 52,082.50 m3
Volume 533,081.28 M3 700000 13,350.00 m2
Luasan 121,470.39 M2 166918.720.00 3.00%
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 sisa volume baty 3 sept (area 1&2)
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 119,620.35
21998 sisa volume area 1 8,032.41
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000 101,624.68 akumulasi sisa volume
Rencana Jam Kerja : 14.00 jam / hari 101574.680.00
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 20000 area c1 estimasi selesai
Sisa Durasi : 20.00 hari 4557.293.40 22,213.00 m3 101.624.68
Volume Didapat : 50,347.10 m3 48,000.00 6,034.00 m2 10/15/21
Luasan Didapat : 31,956.11 m2 10937.5041644681 sisa kubikasi 14,187.00
estimasi 10.91
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/16/21
Volume Material yg Didapat Minggu Ini (V) : 5,375.00 M3 5012.567.01
Konversi Luasan yg Didapat (L) : 1,350.00 M2
14,082.50 3,208.90
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 192 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
30-Jan-21 31-Jan-21 01-Feb-21 02-Feb-21 03-Feb-21 04-Feb-21 05-Feb-21 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 172.00 172.00 172.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 172.00 172.00 172.00 172.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan - - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) - -
2 Durasi Waktu Pengerukan Efektif (Desimal) STANDBY MENUNGGU PERBAIKAN RING BUSHING 0.00 - - 12.00
0.00

C. Kedalaman Pengerukan 0%
1 Rata - Rata Level Eksisting (m) - - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - - 1,300.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!

- - #DIV/0! #DIV/0! - -
Realisasi Progres Pengerukan Area A sd Minggu ke 192

Progres Realisasi
Kontrak Luasan Minggu Ke - 191 Minggu Ke - 192 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 465,695.09 108,188.03 89.07% - - 0.00% 465,695.09 108,188.03 89.07%
KUMULATIF TERHADAP KONTRAK 105,741.48 89.07%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 234,421.90 87.55% - 0.00% 234,421.90 87.55%

pengerukan setelah maintenance lama


A. Target Pengerukan Termijn 6 52,082.50 m3
Volume 533,081.28 M3 700000 13,350.00 m2
Luasan 121,470.39 M2 166918.720.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 sisa volume baty 3 sept (area 1&2)
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 119,620.35
21998 sisa volume area 1
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000 101,624.68 akumulasi sisa volume
Rencana Jam Kerja : 14.00 jam / hari 101574.680.00
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 20000 area c1 estimasi selesai
Sisa Durasi : 20.00 hari 4557.293.40 16,838.00 m3 101.624.68
Volume Didapat : 50,347.10 m3 48,000.00 4,684.00 m2 10/15/21
Luasan Didapat : 31,956.11 m2 10937.5041644681 sisa kubikasi 19,562.00
estimasi 15.05
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/21/21
Volume Material yg Didapat Minggu Ini (V) : - M3 5012.567.01
Konversi Luasan yg Didapat (L) : - M2
14,082.50 3,208.90
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 192 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
06-Feb-21 07-Feb-21 08-Feb-21 09-Feb-21 10-Feb-21 11-Feb-21 12-Feb-21 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 C1
3 Mulai Pengerukan di STA. 172.00 172.00 172.00 172.00 166.00 169.68 169.00
4 Selesai Pengerukan di STA. 172.00 172.00 172.00 172.00 169.68 169.68 172.00
5 Panjang Hasil Pengerukan - - - - - - - - - #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) - -
2 Durasi Waktu Pengerukan Efektif (Desimal) STANDBY MENUNGGU PERBAIKAN RING BUSHING 0.00 - - 12.00
0.00

C. Kedalaman Pengerukan 0%
1 Rata - Rata Level Eksisting (m) - - - - - - - -
2 Rata - Rata Level Dikeruk (m) - - - - - - - -
3 Rata - Rata Ketebalan yg Dikeruk (m) - - - - - - - - - -

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) - - - - - - - - - -
3 Ketebalan Area yg Dikeruk (m) - - - - - - - - - -
4 Volume Material yg Dihasilkan (m3) - - - - - - - - - - 1,300.00
0%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) - - - - - - - - - -
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 300.00
produktivitas Per Jam kalender (m3 / jam) #DIV/0!

- - #DIV/0! #DIV/0! - -
Realisasi Progres Pengerukan Area A sd Minggu ke 192

Progres Realisasi
Kontrak Luasan Minggu Ke - 191 Minggu Ke - 192 Komulatif
No. Area Dredging
(M2)
3 2 3 2 3
(M ) (M ) % (M ) (M ) % (M ) (M2) %

1 Area Dredging - 1 121,470.39 M2 465,695.09 108,188.03 89.07% - - 0.00% 465,695.09 108,188.03 89.07%
KUMULATIF TERHADAP KONTRAK 105,741.48 89.07%
2 Area Dredging - 2 146,276.53 M2 126,233.87 86.30% 0.00% 126,233.87 86.30%

Jumlah 267,746.92 M2 234,421.90 87.55% - 0.00% 234,421.90 87.55%

pengerukan setelah maintenance lama


A. Target Pengerukan Termijn 6 52,082.50 m3
Volume 533,081.28 M3 700000 13,350.00 m2
Luasan 121,470.39 M2 166918.720.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 sisa volume baty 3 sept (area 1&2)
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 119,620.35
21998 sisa volume area 1
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000 101,624.68 akumulasi sisa volume
Rencana Jam Kerja : 14.00 jam / hari 101574.680.00
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 20000 area c1 estimasi selesai
Sisa Durasi : 20.00 hari 4557.293.40 16,838.00 m3 101.624.68
Volume Didapat : 50,347.10 m3 48,000.00 4,684.00 m2 10/15/21
Luasan Didapat : 31,956.11 m2 10937.5041644681 sisa kubikasi 19,562.00
estimasi 15.05
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/21/21
Volume Material yg Didapat Minggu Ini (V) : - M3 5012.567.01
Konversi Luasan yg Didapat (L) : - M2
14,082.50 3,208.90
Realisasi Progres Pengerukan Area A sd Minggu ke 152

Progres Realisasi
Kontrak Luasan Minggu Ke - 151 Minggu Ke - 152 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 379,374.10 86,445.95 71.17% - - 0.00% 379,374.10 86,445.95 71.17%
KUMULATIF TERHADAP KONTRAK 84,491.07 71.17%
2 Area Dredging - 2 146,276.53 M2 135,117.63 92.37% 0.00% 135,117.63 92.37%

Jumlah 267,746.92 M2 221,563.58 82.75% - 0.00% 221,563.58 82.75%

A. Target Pengerukan Termijn 6 hasil baty 82.75%


Volume 533,081.28 M3
Luasan 121,470.39 M2 79.77%
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 82.76% volume belum terkeruk baty 15 apr
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 205,019.47 m3
46,716.69 m2
Target Produktivitas Per jam : 179.81 m3 / jam 74,753.70
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area 2
Sisa Durasi : 20.00 hari 47.15% 35.61%
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2 102,047.48 m2
447,842.50 m3
B. Realisasi Minggu Ini
Realisasi Pengerukan Minggu Ini
Volume Material yg Didapat Minggu Ini (V) : - M3
Konversi Luasan yg Didapat (L) : - M2
Realisasi Progres Pengerukan Area A sd Minggu ke 152

Progres Realisasi
Kontrak Luasan Minggu Ke - 151 Minggu Ke - 152 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 379,374.10 91,430.76 75.27% - 0.00% 379,374.10 91,430.76 75.27%
KUMULATIF TERHADAP KONTRAK 89,363.16 75.27%
2 Area Dredging - 2 146,276.53 M2 135,117.63 92.37% 0.00% 135,117.63 92.37%

Jumlah 267,746.92 M2 226,548.39 84.61% - 0.00% 226,548.39 84.61%

75.27%
A. Target Pengerukan Termijn 6 hasil baty 84.61%
Volume 533,081.28 M3
Luasan 121,470.39 M2 79.77%
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 82.76% volume belum terkeruk baty 15 apr
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 205,019.47 m3
46,716.69 m2
Target Produktivitas Per jam : 179.81 m3 / jam 74,753.70
Rencana Jam Kerja : 14.00 jam / hari
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area 2
Sisa Durasi : 20.00 hari 47.15% 35.61%
Volume Didapat : 50,347.10 m3
Luasan Didapat : 31,956.11 m2 102,047.48 m2
447,842.50 m3
B. Realisasi Minggu Ini
Realisasi Pengerukan Minggu Ini
Volume Material yg Didapat Minggu Ini (V) : - M3
Konversi Luasan yg Didapat (L) : - M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 194 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
13-Feb-21 14-Feb-21 15-Feb-21 16-Feb-21 17-Feb-21 18-Feb-21 19-Feb-21 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track c c c c C1 C1 SLOPE 4
3 Mulai Pengerukan di STA. 172.00 178.00 182.00 190.00 196.00 196.00 30.00
4 Selesai Pengerukan di STA. 178.00 182.00 190.00 196.00 196.00 200.00 36.00
5 Panjang Hasil Pengerukan 6.00 4.00 10.00 8.00 6.00 - 4.00 6.00 6.00 50.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 6 30 6 20 9 40 8 10 8 15 5 40 42.00 155.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 6.50 6.33 9.67 8.17 0.00 8.25 5.67 44.58 - 6.37 12.00
1.00 1.00 1.00 1.00 0.00 1.00 1.00 6.00

C. Kedalaman Pengerukan 53%


1 Rata - Rata Level Eksisting (m) - 7.35 - 10.22 - 8.00 - 7.44 - 6.00 - - 8.00 - 6.10 - 5.50
2 Rata - Rata Level Dikeruk (m) - 13.55 - 13.55 - 11.88 - 10.21 - 10.15 - - 10.15 - 8.45 - 9.00
3 Rata - Rata Ketebalan yg Dikeruk (m) 6.20 3.33 3.88 2.77 4.15 - 2.15 2.35 3.50 28.33 4.72

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 6.00 4.00 10.00 8.00 6.00 - 4.00 6.00 6.00 50.00 7.14
3 Ketebalan Area yg Dikeruk (m) 6.20 3.33 3.88 2.77 4.15 - 2.15 2.35 3.50 28.33 4.05
4 Volume Material yg Dihasilkan (m3) 1,860.00 666.00 1,940.00 1,108.00 1,245.00 - 430.00 705.00 1,050.00 9,004.00 1,286.29 1,300.00
99%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 300.00 200.00 500.00 400.00 300.00 - 200.00 300.00 300.00 2,500.00 357.14
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 286.15 411.47 114.62 152.45 #DIV/0! 137.58 185.29 201.96 300.00
produktivitas Per Jam kalender (m3 / jam) 67%

2,606.00 6.33 411.47 201.96. 1,800.80 100.044.44


Realisasi Progres Pengerukan Area A sd Minggu ke 194

Progres Realisasi
Kontrak Luasan Minggu Ke - 193 Minggu Ke - 194 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 379,374.10 91,430.76 75.27% 9,004.00 2,500.00 2.06% 388,378.10 93,930.76 77.33%
KUMULATIF TERHADAP KONTRAK 91,806.62 77.33%
2 Area Dredging - 2 146,276.53 M2 135,117.63 92.37% 0.00% 135,117.63 92.37%

Jumlah 267,746.92 M2 226,548.39 84.61% 2,500.00 0.93% 229,048.39 85.55%

3% 7,470.14 pengerukan setelah maintenance lama


A. Target Pengerukan Termijn 6 61,086.50 m3
Volume 533,081.28 M3 700000 15,850.00 m2
Luasan 121,470.39 M2 166918.720.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 sisa volume baty 3 sept (area 1&2)
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 110,616.35
21998 sisa volume area 1
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000 92,620.68 akumulasi sisa volume
Rencana Jam Kerja : 14.00 jam / hari 92570.680.00
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari 20000 area c1 estimasi selesai
Sisa Durasi : 20.00 hari 4557.293.40 25,842.00 m3 92.620.68
Volume Didapat : 50,347.10 m3 48,000.00 7,184.00 m2 10/6/21
Luasan Didapat : 31,956.11 m2 10937.5041644681 sisa kubikasi 10,558.00
estimasi 8.12
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/14/21
Volume Material yg Didapat Minggu Ini (V) : 9,004.00 M3 5012.567.01
Konversi Luasan yg Didapat (L) : 2,500.00 M2
23,086.50 5,260.60
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 194 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
20-Feb-21 21-Feb-21 22-Feb-21 23-Feb-21 24-Feb-21 25-Feb-21 26-Feb-21 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track SLOPE 4 SLOPE 4 SLOPE 4 SLOPE 4 SLOPE 4 SLOPE 4 SLOPE 4
3 Mulai Pengerukan di STA. 36.00 40.00 44.00 46.00 50.00 50.00 30.00
4 Selesai Pengerukan di STA. 40.00 44.00 46.00 50.00 50.00 51.00 34.00
5 Panjang Hasil Pengerukan 4.00 4.00 2.00 2.00 4.00 - 1.00 4.00 21.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 6 25 8 40 9 45 7 25 6 50 8 45 44.00 230.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 6.42 8.67 9.75 7.42 0.00 6.83 8.75 47.83 - 6.83 12.00
1.00 1.00 1.00 1.00 0.00 1.00 1.00 6.00

C. Kedalaman Pengerukan 57%


1 Rata - Rata Level Eksisting (m) - 5.50 - 4.10 - 4.10 - 4.00 - 4.00 - - 3.90 - 3.90
2 Rata - Rata Level Dikeruk (m) - 6.65 - 6.65 - 6.65 - 6.65 - 6.65 - - 6.65 - 6.65
3 Rata - Rata Ketebalan yg Dikeruk (m) 1.15 2.55 2.55 2.65 2.65 - 2.75 2.75 17.05 2.84

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 4.00 4.00 2.00 2.00 4.00 - 1.00 4.00 21.00 3.00
3 Ketebalan Area yg Dikeruk (m) 1.15 2.55 2.55 2.65 2.65 - 2.75 2.75 17.05 2.44
4 Volume Material yg Dihasilkan (m3) 230.00 510.00 255.00 265.00 530.00 - 137.50 550.00 2,477.50 353.93 1,300.00
27%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 200.00 200.00 100.00 100.00 200.00 - 50.00 200.00 1,050.00 150.00
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 35.84 58.85 53.33 71.46 #DIV/0! 20.12 62.86 51.79 300.00
produktivitas Per Jam kalender (m3 / jam) 17%

510.00 8.67 58.85 51.79. 495.50 27.527.78


Realisasi Progres Pengerukan Area A sd Minggu ke 195

Progres Realisasi
Kontrak Luasan Minggu Ke - 194 Minggu Ke - 195 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 388,378.10 93,930.76 77.33% 2,477.50 14,798.03 12.18% 390,855.60 108,728.79 89.51%
KUMULATIF TERHADAP KONTRAK 106,270.01 89.51%
2 Area Dredging - 2 146,276.53 M2 135,117.63 92.37% 0.00% 135,117.63 92.37%

Jumlah 267,746.92 M2 229,048.39 85.55% 14,798.03 5.53% 243,846.42 91.07%

4259 ADL PENAMBAHAN PROGRES UTK AKHIR BULAN AGAR TIDAK MINUS (DIAMBIL DARpengerukan setelah maintenance lama
A. Target Pengerukan Termijn 6 4,864.03 4,625 63,564.00 m3
Volume 533,081.28 M3 700000 30,648.03 m2
Luasan 121,470.39 M2 166918.720.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 sisa volume baty 3 sept (area 1&2)
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 108,138.85
21998 sisa volume area 1
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000 90,143.18 akumulasi sisa volume
Rencana Jam Kerja : 14.00 jam / hari 90093.180.00
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area slope 4 estimasi selesai
Sisa Durasi : 20.00 hari 3,527.50 m3 90.143.18
Volume Didapat : 50,347.10 m3 1,350.00 m2 10/4/21
Luasan Didapat : 31,956.11 m2 sisa kubikasi 14,614.41
estimasi 14.61
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/20/21
Volume Material yg Didapat Minggu Ini (V) : 2,477.50 M3 18690.918.60
Konversi Luasan yg Didapat (L) : 1,050.00 M2
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 196 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
27-Feb-21 28-Feb-21 01-Mar-21 02-Mar-21 03-Mar-21 04-Mar-21 05-Mar-21 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track SLOPE 4 SLOPE 4 SLOPE 4 SLOPE 4 SLOPE 4 SLOPE 4 SLOPE 4
3 Mulai Pengerukan di STA. 36.00 40.00 42.00 44.00 46.00 47.00 30.00
4 Selesai Pengerukan di STA. 40.00 42.00 44.00 46.00 47.00 49.00 31.00
5 Panjang Hasil Pengerukan 4.00 2.00 2.00 2.00 2.00 1.00 1.00 2.00 1.00 17.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 7 0 11 25 9 0 3 0 10 20 2 15 6 20 48.00 80.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 7.00 11.42 9.00 3.00 10.33 2.25 6.33 49.33 - 7.05 12.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 7.00

C. Kedalaman Pengerukan 59%


1 Rata - Rata Level Eksisting (m) - 4.50 - 3.00 - 6.65 - 6.65 - 6.00 - 6.65 - 4.40 - 3.90 - 3.00
2 Rata - Rata Level Dikeruk (m) - 9.50 - 9.60 - 10.20 - 9.50 - 9.80 - 10.40 - 9.20 - 5.65 - 8.40
3 Rata - Rata Ketebalan yg Dikeruk (m) 5.00 6.60 3.55 2.85 3.80 3.75 4.80 1.75 5.40 37.50 6.25

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 4.00 2.00 2.00 2.00 2.00 1.00 1.00 2.00 1.00 17.00 2.43
3 Ketebalan Area yg Dikeruk (m) 5.00 6.60 3.55 2.85 3.80 3.75 4.80 1.75 5.40 37.50 5.36
4 Volume Material yg Dihasilkan (m3) 1,000.00 660.00 355.00 285.00 380.00 187.50 240.00 175.00 270.00 3,552.50 507.50 1,300.00
39%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 200.00 100.00 100.00 100.00 100.00 50.00 50.00 100.00 50.00 850.00 121.43
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 142.86 57.81 71.11 126.67 18.15 77.78 42.63 72.01 300.00
produktivitas Per Jam kalender (m3 / jam) 24%

660.00 11.42 57.81 72.01. 710.50 39.472.22


Realisasi Progres Pengerukan Area A sd Minggu ke 196

Progres Realisasi
Kontrak Luasan Minggu Ke - 194 Minggu Ke - 195 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 390,855.60 108,728.79 89.51% 3,552.50 850.00 0.70% 394,408.10 109,578.79 90.21%
KUMULATIF TERHADAP KONTRAK 107,100.79 90.21%
2 Area Dredging - 2 146,276.53 M2 135,117.63 92.37% 0.00% 135,117.63 92.37%

Jumlah 267,746.92 M2 243,846.42 91.07% 850.00 0.32% 244,696.42 91.39%

1.48% 3,962.65 pengerukan setelah maintenance lama


A. Target Pengerukan Termijn 6 67,116.50 m3
Volume 533,081.28 M3 700000 31,498.03 m2
Luasan 121,470.39 M2 166918.720.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 sisa volume baty 3 sept (area 1&2)
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 104,586.35
21998 sisa volume area 1
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000 86,590.68 akumulasi sisa volume
Rencana Jam Kerja : 14.00 jam / hari 86540.680.00
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area slope 4 estimasi selesai
Sisa Durasi : 20.00 hari 7,080.00 m3 86.590.68
Volume Didapat : 50,347.10 m3 2,200.00 m2 9/30/21
Luasan Didapat : 31,956.11 m2 sisa kubikasi 11,061.91
estimasi 11.06
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/17/21
Volume Material yg Didapat Minggu Ini (V) : 3,552.50 M3 4,864.03
AGAR TIDAK MINUS (DIAMBIL DARI PETA DAN DI CARI
Konversi Luasan yg Didapat (L) : 850.00 M2
MANA AREA YANG DAPAT DI PROGRES SECARA
1,344,567.00
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 197 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
06-Mar-21 07-Mar-21 08-Mar-21 09-Mar-21 10-Mar-21 11-Mar-21 12-Mar-21 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track SLOPE 4 SLOPE 4 SLOPE 4 SLOPE 4 SLOPE 4 SLOPE 4 SLOPE 4
3 Mulai Pengerukan di STA. 36.00 37.00 39.00 41.00 43.00 49.00 30.00
4 Selesai Pengerukan di STA. 37.00 39.00 41.00 43.00 49.00 53.00 32.00
5 Panjang Hasil Pengerukan 1.00 2.00 2.00 2.00 6.00 4.00 2.00 19.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 6 45 6 10 12 35 11 0 11 55 10 55 4 15 60.00 215.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 6.75 6.17 12.58 11.00 11.92 10.92 4.25 63.58 1.00 9.08 12.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 7.00

C. Kedalaman Pengerukan 76%


1 Rata - Rata Level Eksisting (m) - 4.50 - 4.50 - 5.00 - 6.65 - 6.65 - 6.00 - - 6.00 - 3.00
2 Rata - Rata Level Dikeruk (m) - 10.20 - 6.65 - 7.80 - 9.50 - 9.50 - 10.50 - - 9.80 - 8.50
3 Rata - Rata Ketebalan yg Dikeruk (m) 5.70 2.15 2.80 2.85 2.85 4.50 - 3.80 5.50 30.15 5.03

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 1.00 2.00 2.00 - 2.00 6.00 - 4.00 2.00 19.00 2.71
3 Ketebalan Area yg Dikeruk (m) 5.70 2.15 2.80 2.85 2.85 4.50 - 3.80 5.50 30.15 4.31
4 Volume Material yg Dihasilkan (m3) 285.00 215.00 280.00 - 285.00 1,350.00 - 760.00 550.00 3,725.00 532.14 1,300.00
41%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 50.00 100.00 100.00 - 100.00 300.00 - 200.00 100.00 950.00 135.71
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 42.22 34.86 22.25 25.91 113.29 69.62 129.41 58.58 300.00
produktivitas Per Jam kalender (m3 / jam) 20%

215.00 6.17 34.86 58.58. 745.00 41.388.89


Realisasi Progres Pengerukan Area A sd Minggu ke 197

Progres Realisasi
Kontrak Luasan Minggu Ke - 196 Minggu Ke - 197 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 394,408.10 109,578.79 90.21% 3,725.00 950.00 0.78% 398,133.10 110,528.79 90.99%
KUMULATIF TERHADAP KONTRAK 108,029.30 90.99%
2 Area Dredging - 2 146,276.53 M2 135,117.63 92.37% 0.00% 135,117.63 92.37%

Jumlah 267,746.92 M2 244,696.42 91.39% 950.00 0.35% 245,646.42 91.75%

1.48% 3,962.65 pengerukan setelah maintenance lama


A. Target Pengerukan Termijn 6 70,841.50 m3
Volume 533,081.28 M3 700000 32,448.03 m2
Luasan 121,470.39 M2 166918.720.00
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 sisa volume baty 3 sept (area 1&2)
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 100,861.35
21998 sisa volume area 1
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000 82,865.68 akumulasi sisa volume
Rencana Jam Kerja : 14.00 jam / hari 82815.680.00
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area slope 4 estimasi selesai
Sisa Durasi : 20.00 hari 10,805.00 m3 82.865.68
Volume Didapat : 50,347.10 m3 3,150.00 m2 9/26/21
Luasan Didapat : 31,956.11 m2 sisa kubikasi 7,336.91
estimasi 7.34
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/13/21
Volume Material yg Didapat Minggu Ini (V) : 3,725.00 M3 4,625
Konversi Luasan yg Didapat (L) : 950.00 M2 AREA DARAT
1,344,567.00
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 198 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
13-Mar-21 14-Mar-21 15-Mar-21 16-Mar-21 17-Mar-21 18-Mar-21 19-Mar-21 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track SLOPE 4 SLOPE 4 SLOPE 4 SLOPE 4 SLOPE 4 SLOPE 4 SLOPE 4
3 Mulai Pengerukan di STA. 36.00 38.00 40.00 42.00 44.00 47.00 47.00
4 Selesai Pengerukan di STA. 38.00 40.00 42.00 44.00 47.00 47.00 52.00
5 Panjang Hasil Pengerukan 2.00 2.00 2.00 2.00 3.00 - 5.00 16.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 15 5 10 5 3 45 6 45 7 20 0 0 9 50 50.00 170.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 15.08 10.08 3.75 6.75 7.33 0.00 9.83 52.83 - 7.55 12.00
1.00 1.00 1.00 1.00 1.00 0.00 1.00 6.00

C. Kedalaman Pengerukan 63%


1 Rata - Rata Level Eksisting (m) - 6.00 - 5.00 - 3.50 - 6.50 - 5.00 - - - 4.50
2 Rata - Rata Level Dikeruk (m) - 9.00 - 8.00 - 8.50 - 8.50 - 8.50 - - - 8.50
3 Rata - Rata Ketebalan yg Dikeruk (m) 3.00 3.00 5.00 2.00 3.50 - - 4.00 20.50 3.42

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 2.00 2.00 2.00 2.00 3.00 - - - 5.00 16.00 2.29
3 Ketebalan Area yg Dikeruk (m) 3.00 3.00 5.00 2.00 3.50 - - - 4.00 20.50 2.93
4 Volume Material yg Dihasilkan (m3) 300.00 300.00 500.00 - 200.00 525.00 - - - 1,000.00 2,825.00 403.57 1,300.00
31%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 100.00 100.00 100.00 - 100.00 150.00 - - - 250.00 800.00 114.29
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 19.89 29.75 133.33 29.63 71.59 - 101.69 53.47 300.00
produktivitas Per Jam kalender (m3 / jam) 18%

300.00 10.08 29.75 53.47. 565.00 31.388.89


Realisasi Progres Pengerukan Area A sd Minggu ke 198

Progres Realisasi
Kontrak Luasan Minggu Ke - 197 Minggu Ke - 198 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 398,133.10 110,528.79 90.99% 2,825.00 1,400.00 1.15% 400,958.10 111,928.79 92.14%
KUMULATIF TERHADAP KONTRAK 109,397.65 92.14%
2 Area Dredging - 2 146,276.53 M2 135,117.63 92.37% 0.00% 135,117.63 92.37%

Jumlah 267,746.92 M2 245,646.42 91.75% 1,400.00 0.52% 247,046.42 92.27%

pengerukan setelah maintenance lama


A. Target Pengerukan Termijn 6 73,666.50 m3
Volume 533,081.28 M3 33,848.03 m2 153,707.81 21902.530.00
Luasan 121,470.39 M2 131,805.28 4990.8127726539
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 sisa volume baty 3 sept (area 1&2)
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 98,036.35
sisa volume area 1
Target Produktivitas Per jam : 179.81 m3 / jam 58,138.78 akumulasi sisa volume
Rencana Jam Kerja : 14.00 jam / hari 58088.780.00
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area slope 4 estimasi selesai
Sisa Durasi : 20.00 hari 13,630.00 m3 58.138.78
Volume Didapat : 50,347.10 m3 3,950.00 m2 9/2/21
Luasan Didapat : 31,956.11 m2 sisa kubikasi 4,511.91
estimasi 4.51
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/10/21
Volume Material yg Didapat Minggu Ini (V) : 2,825.00 M3
Konversi Luasan yg Didapat (L) : 800.00 M2
1,344,567.00
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 199 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
20-Mar-21 21-Mar-21 22-Mar-21 23-Mar-21 24-Mar-21 25-Mar-21 26-Mar-21 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track SLOPE 4 SLOPE 4 SLOPE 4 SLOPE 4 SLOPE 4 SLOPE 4 SLOPE 4
3 Mulai Pengerukan di STA. 52.00 56.00 59.00 59.00 61.00 64.00 67.00
4 Selesai Pengerukan di STA. 56.00 59.00 59.00 61.00 64.00 67.00 70.00
5 Panjang Hasil Pengerukan 4.00 3.00 - 2.00 3.00 3.00 3.00 18.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 10 30 3 55 0 0 2 55 4 55 12 45 6 15 37.00 255.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 10.50 3.92 0.00 2.92 4.92 12.75 6.25 41.25 - 5.89 12.00
1.00 1.00 0.00 1.00 1.00 1.00 1.00 6.00

C. Kedalaman Pengerukan 49%


1 Rata - Rata Level Eksisting (m) - 7.20 - 4.50 - - 8.50 - 3.70 - - 5.00 - 3.00
2 Rata - Rata Level Dikeruk (m) - 13.55 - 8.50 - - 10.60 - 7.00 - - 8.50 - 8.50
3 Rata - Rata Ketebalan yg Dikeruk (m) 6.35 4.00 - 2.10 3.30 - 3.50 5.50 24.75 4.13

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 4.00 3.00 - 2.00 3.00 - 3.00 - 3.00 18.00 2.57
3 Ketebalan Area yg Dikeruk (m) 6.35 4.00 - 2.10 3.30 - 3.50 - 5.50 24.75 3.54
4 Volume Material yg Dihasilkan (m3) 1,270.00 600.00 - - 210.00 495.00 - 525.00 - 825.00 3,925.00 560.71 1,300.00
43%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 200.00 150.00 - - 100.00 150.00 - 150.00 - 150.00 900.00 128.57
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 120.95 153.19 #DIV/0! 72.00 100.68 41.18 132.00 95.15 300.00
produktivitas Per Jam kalender (m3 / jam) 32%

600.00 3.92 153.19 95.15. 17230.750.00 785.00 43.611.11


Realisasi Progres Pengerukan Area A sd Minggu ke 199

Progres Realisasi
Kontrak Luasan Minggu Ke - 198 Minggu Ke - 199 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 400,958.10 111,928.79 92.14% 3,925.00 900.00 0.74% 404,883.10 112,828.79 92.89%
KUMULATIF TERHADAP KONTRAK 110,277.29
2 Area Dredging - 2 146,276.53 M2 135,117.63 92.37% 0.00% 135,117.63 92.37%

Jumlah 267,746.92 M2 247,046.42 92.27% 900.00 0.34% 247,946.42 92.60%

0.15% 600.00 pengerukan setelah maintenance lama


A. Target Pengerukan Termijn 6 799.621.92 2633.1418546 77,591.50 m3
Volume 533,081.28 M3 700000 34,748.03 m2 153,707.81 21902.530.00
Luasan 121,470.39 M2 166918.720.00 131,805.28 4990.81277265392
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 sisa volume baty 3 sept (area 1&2)
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 94,111.35
21998 sisa volume area 1
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000 54,213.78 akumulasi sisa volume
Rencana Jam Kerja : 14.00 jam / hari 54163.780.00
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area slope 4 estimasi selesai
Sisa Durasi : 20.00 hari 17,555.00 m3 54.213.78
Volume Didapat : 50,347.10 m3 4,850.00 m2 8/29/21
Luasan Didapat : 31,956.11 m2 sisa kubikasi 586.91
estimasi 0.59
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/6/21
Volume Material yg Didapat Minggu Ini (V) : 3,925.00 M3 1,344,567 1,633.32
Konversi Luasan yg Didapat (L) : 900.00 M2 3,844,452
1,344,567.00
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 199 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
27-Mar-21 28-Mar-21 29-Mar-21 30-Mar-21 31-Mar-21 01-Apr-21 02-Apr-21 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track SLOPE 4 SLOPE 4 SLOPE 4 SLOPE 5 SLOPE 5 SLOPE 5 SLOPE 4
3 Mulai Pengerukan di STA. 70.00 73.00 76.00 79.00 82.00 85.00 89.00
4 Selesai Pengerukan di STA. 73.00 76.00 79.00 82.00 85.00 89.00 97.00
5 Panjang Hasil Pengerukan 3.00 3.00 3.00 3.00 3.00 4.00 8.00 27.00 27.00

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 9 25 9 50 2 0.5 11 20 6 25 14 5 11 55 62.00 180.50
2 Durasi Waktu Pengerukan Efektif (Desimal) 9.42 9.83 2.01 11.33 6.42 14.08 11.92 65.01 1.00 9.29 12.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 7.00

C. Kedalaman Pengerukan 77%


1 Rata - Rata Level Eksisting (m) - 5.00 - 3.00 - 3.00 - 3.00 - 6.50 - - 5.00 - 5.00
2 Rata - Rata Level Dikeruk (m) - 7.00 - 7.00 - 7.00 - 7.00 - 8.25 - - 8.50 - 8.50
3 Rata - Rata Ketebalan yg Dikeruk (m) 2.00 4.00 4.00 4.00 1.75 - 3.50 3.50 22.75 3.79

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 3.00 3.00 3.00 3.00 3.00 - 4.00 - 8.00 27.00 3.86
3 Ketebalan Area yg Dikeruk (m) 2.00 4.00 4.00 4.00 1.75 - 3.50 - 3.50 22.75 3.25
4 Volume Material yg Dihasilkan (m3) 300.00 600.00 600.00 600.00 262.50 - 700.00 - 1,400.00 4,462.50 637.50 1,300.00
49%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 150.00 150.00 150.00 150.00 150.00 - 200.00 - 400.00 1,350.00 192.86
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 31.86 61.02 298.76 52.94 40.91 49.70 117.48 68.65 300.00
produktivitas Per Jam kalender (m3 / jam) 23%

600.00 9.83 61.02 68.65. 892.50 49.583.33


Realisasi Progres Pengerukan Area A sd Minggu ke 200

Progres Realisasi
Kontrak Luasan Minggu Ke - 199 Minggu Ke - 200 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 404,883.10 112,828.79 92.89% 4,462.50 1,350.00 1.11% 409,345.60 114,178.79 94.00%
KUMULATIF TERHADAP KONTRAK 111,596.76
2 Area Dredging - 2 146,276.53 M2 135,117.63 92.37% 0.00% 135,117.63 92.37%

Jumlah 267,746.92 M2 247,946.42 92.60% 1,350.00 0.50% 249,296.42 93.11%

91.31% 90.73% 3.98% 10656.327.50 9306.327.50 pengerukan setelah maintenance lama


A. Target Pengerukan Termijn 6 46766.036.57 2,326.58 82,054.00 m3
Volume 533,081.28 M3 1.72% 4605.247.06 46.531.64 36,098.03 m2 153,707.81 21902.530.00
Luasan 121,470.39 M2 20210.447.97 131,805.28 4990.8127726539
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 42,303.54 sisa volume baty 3 sept (area 1&2)
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 89,648.85
21998 sisa volume area 1
Target Produktivitas Per jam : 179.81 m3 / jam 791,928,000 49,751.28 akumulasi sisa volume
Rencana Jam Kerja : 14.00 jam / hari 49701.280.00
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area slope 4 estimasi selesai
Sisa Durasi : 20.00 hari 22,017.50 m3 49.751.28
Volume Didapat : 50,347.10 m3 6,200.00 m2 8/24/21
Luasan Didapat : 31,956.11 m2 sisa kubikasi - 3,875.59
estimasi - 3.88
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 7/2/21
Volume Material yg Didapat Minggu Ini (V) : 4,462.50 M3 1,344,567 1,633.32
Konversi Luasan yg Didapat (L) : 1,350.00 M2 3,844,452
1,344,567.00
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Periode Minggu Ke : 199 Target per hari


Lokasi : 1B jam efektif : 10 jam
Target Kedalaman : -13.55 ICD luasan : 1027.38 m2
Total Kubikasi : 194,909.80 m3 kubikasi : 2000 m3
Total Luas : 24,439.00 m2 penyelesaian : 13 hari
total panjang track : 369.57 m2 panjang : m
lebar : 50 m

Tanggal
03-Apr-21 04-Apr-21 05-Apr-21 06-Apr-21 07-Apr-21 08-Apr-21 09-Apr-21 Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF Minggu
Siang Siang Siang Siang Siang Siang Siang

A Track Pengerukan
1 Nama Track SLOPE 5 SLOPE 5 SLOPE 5 SLOPE 5 SLOPE 5 SLOPE 5 SLOPE 5
3 Mulai Pengerukan di STA. 70.00 73.00 76.00 79.00 82.00 85.00 89.00
4 Selesai Pengerukan di STA. 73.00 76.00 79.00 82.00 85.00 89.00 97.00
5 Panjang Hasil Pengerukan 3.00 3.00 3.00 3.00 3.00 4.00 8.00 27.00 #DIV/0!

B. Waktu Pelaksanaan
1 Durasi Waktu Pengerukan Efektif (Jam) 4 45 5 45 10 25 6 15 25.00 130.00
2 Durasi Waktu Pengerukan Efektif (Desimal) 4.75 5.75 10.42 6.25 0.00 0.00 0.00 27.17 - 3.88 12.00
1.00 1.00 1.00 1.00 0.00 0.00 0.00 4.00

C. Kedalaman Pengerukan 32%


1 Rata - Rata Level Eksisting (m) - 3.00 - 3.00 - 3.00 - 3.00 - 3.00 - 3.00 - 3.00
2 Rata - Rata Level Dikeruk (m) - 6.65 - 6.65 - 6.65 - 6.65 - 6.65 - 6.65 - 6.65
3 Rata - Rata Ketebalan yg Dikeruk (m) 3.65 3.65 3.65 3.65 3.65 - 3.65 3.65 25.55 4.26

D. Volume Pengerukan
1 Lebar Area yg Dikeruk (m) 50.00 50.00 50.00 50.00 50.00 50.00 50.00 42.00 42.00
2 Panjang Area yg Dikeruk (m) 3.00 3.00 3.00 3.00 3.00 - 4.00 - 8.00 27.00 3.86
3 Ketebalan Area yg Dikeruk (m) 3.65 3.65 3.65 3.65 3.65 - 3.65 - 3.65 25.55 3.65
4 Volume Material yg Dihasilkan (m3) 547.50 547.50 547.50 547.50 547.50 - 730.00 - 1,460.00 4,927.50 703.93 1,300.00
54%
5 Luasan Area yg Dikeruk (< -8.00 ICD) (m2) 150.00 150.00 150.00 150.00 150.00 - 200.00 - 400.00 1,350.00 192.86
Konversi Luasan (Mencapai Target
6 - -
-13,55 ICD) (m2)
7 Produktivitas Per Jam (m2 / jam) 115.26 95.22 52.56 87.60 #DIV/0! #DIV/0! #DIV/0! 181.38 300.00
produktivitas Per Jam kalender (m3 / jam) 60%

547.50 5.75 95.22 181.38. 985.50 54.750.00


Realisasi Progres Pengerukan Area A sd Minggu ke 200

Progres Realisasi
Kontrak Luasan Minggu Ke - 199 Minggu Ke - 200 Komulatif
No. Area Dredging
(M2)
(M3) (M2) % (M3) (M2) % (M3) (M2) %

1 Area Dredging - 1 121,470.39 M2 409,345.60 114,178.79 94.00% 4,927.50 1,350.00 1.11% 414,273.10 115,528.79 95.11%
KUMULATIF TERHADAP KONTRAK 112,916.24
2 Area Dredging - 2 146,276.53 M2 135,117.63 92.37% 0.00% 135,117.63 92.37%

Jumlah 267,746.92 M2 249,296.42 93.11% 1,350.00 0.50% 250,646.42 93.61%

pengerukan setelah maintenance lama


A. Target Pengerukan Termijn 6 86,981.50 m3
Volume 533,081.28 M3 37,448.03 m2 153,707.81
Luasan 121,470.39 M2 131,805.28
Rasio Vol. Terhadap Luasan CCO 4.39 M3/M2 sisa volume baty 3 sept (area 1&2)
Rasio Luas CCO Terhadap Kntrak Awal 100.00% 84,721.35
sisa volume area 1
Target Produktivitas Per jam : 179.81 m3 / jam 44,823.78 akumulasi sisa volume
Rencana Jam Kerja : 14.00 jam / hari 44773.780.00
Target Produksi Harian Rata-Rata (PHR) : 2,517.36 m3 / hari area slope 4 estimasi selesai
Sisa Durasi : 20.00 hari 26,945.00 m3 44.823.78
Volume Didapat : 50,347.10 m3 7,550.00 m2 8/19/21
Luasan Didapat : 31,956.11 m2 sisa kubikasi - 8,803.09
estimasi - 8.80
B. Realisasi Minggu Ini tanggal selesai 7/6/21
Realisasi Pengerukan Minggu Ini 6/27/21
Volume Material yg Didapat Minggu Ini (V) : 4,927.50 M3 1,633.32
Konversi Luasan yg Didapat (L) : 1,350.00 M2
1,344,567.00
REKAPITULASI LOG BOOK HARIAN - KK MULIA 07

Tanggal
Rata - Rata per
No. Uraian Total Hari dlm 1 Target
KOMULATIF SLOPE 6 KOTAK SLOPE 6 KOTAK SLOPE 7 KOTAK Minggu
SLOPE 6 KOTAK 6 SLOPE 6 KOTAK 8 SLOPE 7 KOTAK 4 SLOPE 7 KOTAK 5 SLOPE 7 KOTAK 6 SLOPE 7 KOTAK 8 SLOPE 8 KOTAK 8
5 7 7
1 Rata - Rata Level Eksisting (m) - 4.95 - 3.25 - 1.55 0.15 - 6.65 - 4.95 - 3.25 - 1.55 0.15 0.15
2 Rata - Rata Level Dikeruk (m) - 11.75 - 11.75 - 11.75 - 11.75 - 11.75 - 11.75 - 11.75 - 11.75 - 11.75 - 11.75
3 Rata - Rata Ketebalan yg Dikeruk (m) 6.80 8.50 10.20 11.90 5.10 6.80 8.50 10.20 11.90 11.90 91.80 15.30
D. Volume Pengerukan
2 luasan Area yg Dikeruk (m) 70,189 319,142 463,474.00 958,380.00 29,530.00 258,935.00 514,985.00 577,360.00 1,186,708.00 151,710.00 4,530,413.00 647,201.86
3 Ketebalan Area yg Dikeruk (m) 6.80 8.50 10.20 11.90 5.10 6.80 8.50 10.20 11.90 11.90 91.80 13.11
4 Volume Material yg Dihasilkan (m3) 477,285 2,712,707 4,727,435 11,404,722 150,603 1,760,758 4,377,373 5,889,072 14,121,825 1,805,349 47,427,129 6,775,304.10 1,300.00