Harga Sat.
Bahan / Upah / Alat Bahan
Rp.
5
Rp30,000.00 Rp5,001.00 -
Rp10,500.00 - -
Rp48,000.00 - Rp2,880.00
Rp52,000.00 - Rp312.00
Rp38,000.00 - Rp1,368.00
Rp60,000.00 - Rp108.00
Rp5,001.00 Rp4,668.00
Rp153,000.00 Rp25,505.10
Rp53,550.00 -
Rp48,000.00 -
Rp52,000.00 -
Rp38,000.00 -
Rp60,000.00 - Rp25,505.10
Rp235,000.00 Rp39,174.50
Rp82,250.00 -
Rp48,000.00 -
Rp52,000.00 -
Rp38,000.00 -
Rp60,000.00 - Rp39,174.50
Rp95,000.00 Rp95,000.00 -
Rp33,250.00 - -
Rp48,000.00 - Rp129,600.00
Rp52,000.00 - Rp28,080.00
Rp38,000.00 - Rp68,400.00
Rp60,000.00 - Rp6,600.00
Rp95,000.00 Rp232,680.00
Rp960,750.00 - -
Rp48,000.00 - Rp129,600.00
Rp52,000.00 - Rp28,080.00
Rp38,000.00 - Rp68,400.00
Rp60,000.00 - Rp6,600.00
Rp2,745,000.00 Rp232,680.00
Rp22,000.00 Rp22,000.00
Rp1,320.00 -
Rp38,000.00 -
Rp60,000.00 - Rp22,000.00
Rp2,050,000.00 Rp2,050,000.00 -
Rp123,000.00 - -
Rp48,000.00 - Rp52,800.00
Rp52,000.00 - Rp520.00
Rp38,000.00 - Rp125,400.00
Rp60,000.00 - Rp9,600.00
Rp2,050,000.00 Rp188,320.00
E KECIL) Rp36,900.00
Rp50,000.00
Rp57,084.53
Rp71,656.00
Rp8,591,412.59
Rp40,000.00
Rp294,000.00
Rp36,900.00
Rp7,000.00
Rp36,500.00
Rp58,750.00
Rp4,850,000.00 Rp4,850,000.00
Rp38,000.00 -
Rp60,000.00 -
Rp4,850,000.00
NO URAIAN PEKERJA
1 2
L. PEKERJAAN INSTALASI AIR DAN SANITASI
L.1 Pipa PVC 1''
L.2 Pipa PVC 3''
L.3 Pipa PVC 4"
L.4 Bak
L.5 Bathtub
L.6 Keran
L.7 Kloset Duduk
L.8 Kitchen zink stainless 2 lobang
L.9 Septictank
L.10 Pompa Zet Pump
NO URAIAN PEKERJA
1 2
L. PEKERJAAN PENGECATAN
L.1 Pipa PVC 1''
L.2 Pipa PVC 3''
L.3 Pipa PVC 4"
L.4 Bak
L.5 Bathtub
L.6 Keran
L.7 Kloset Duduk
L.8 Kitchen zink stainless 2 lobang
L.9 Septictank
L.10 Pompa Zet Pump
XII.6 Keran
Pekerja
Mandor
XII.9 Septictank
Pekerja
Tukang batu
Kepala tukang batu
Mandor
Volume Sat
6 7
13.000 m'
13 m'
13 m'
13 m'
7.000 m'
7 m'
7 m'
7 m'
9.000 m'
9 m'
9 m'
9 m'
2.000 bh
2 bh
2 bh
2 bh
2.000 bh
2 bh
2 bh
2 bh
6 bh
6 bh
2.000 bh
2 bh
2 bh
2 bh
1.000 bh
1 bh
1 bh
1 bh
1.000 unit
1 unit
1 unit
1 unit
1.000 unit
1 unit
Tukang batu
Kepala tukang batu
Pekerja
Mandor
Tukang batu
Kepala tukang batu
Pekerja
Mandor
Tukang batu
Kepala tukang batu
Pekerja
Mandor
Pekerja
Mandor
Tukang batu
Kepala tukang batu
Pekerja
Mandor
Tukang batu
Kepala tukang batu
Pekerja
Mandor
Pekerja
Mandor
13 m'
7 m'
2 bh
2 bh
2 bh
1 bh
No.
1
XII PEKERJAAN INSTALASI AIR DAN SANITASI
XII.1 Pipa PVC 1''
Pipa PVC maspion abu diameter 1" (AW)
XII.4 Bak
Bak fiberglass
XII.5 Bathtub
Bathtube standard bh
XII.6 Keran
Kran stainless lokal kait
XII.9 Septictank
Galian tanah
Pasir urug M3 0
Lantai kerja t = 10 cm M2
Pas. Bata 1 PC : 2 PS + plesteran
Plat beton penutup dan balok M
Pipa PVC 4" jenis AW + sambungan M1
Pipa GIP 1 1/2"
Galian tanah untuk rembesan M3
Pas.ijuk
bh 1
No.
1 Pekerja
2 Tukang batu
3 Kepala tukang batu
4 Mandor
o.
1
2 Pipa PVC maspion abu diameter 3" (AW)
3 Pipa PVC maspion abu diameter 4" (AW)
4 Bak fiberglass
5 Bathtube standard
6 Kran stainless lokal kait
7 Kloset duduk warna standard TOTO C 240 lengkap
8 Kitchen zink stainless 2 lubang
9 Galian tanah
10 Pasir urug
11 Lantai kerja t = 10 cm
12 Pas. Bata 1 PC : 2 PS + plesteran
13 Plat beton penutup dan balok
14 Pipa PVC 4" jenis AW + sambungan
15 Pipa GIP 1 1/2"
16 Galian tanah untuk rembesan
17 Pas.ijuk
18 Urugan kerikil 3,5 cm
19 Pipa PVC 4" berlobang jenis AW
20 Urugan kembali perataan tanah
21 Pompa zetpump 250 watt sanyo
Rp1,074,840 1.667
Rp2,577,424 0.033
Rp216,000 0.6
Rp352,800 0.133
Rp124,538 0.375
Rp37,800 0.6
Rp38,325 0.117
Rp528,750 1
Rp11,248 0.125
Rp4,850,000 0.111
Rp21,050,043 Jumlah
NO
1
L. PEKERJAAN INSTALASI AIR DAN SANITASI
L.1 Pipa PVC 1''
L.2 Pipa PVC 3''
L.3 Pipa PVC 4"
L.4 Bak
L.5 Bathtub
L.6 Keran
L.7 Kloset Duduk
L.8 Kitchen zink stainless 2 lobang
L.9 Septictank
L.10 Pompa Zet Pump
NO
1
L. PEKERJAAN PENGECATAN
L.1 Pipa PVC 1''
L.2 Pipa PVC 3''
L.3 Pipa PVC 4"
L.4 Bak
L.5 Bathtub
L.6 Keran
L.7 Kloset Duduk
L.8 Kitchen zink stainless 2 lobang
L.9 Septictank
L.10 Pompa Zet Pump
No. Jenis Pekerja
1
2
3 Kepala tukang batu
4
No.
TOR
RAB Bahan
Rp235,047
Rp1,198,740
Rp2,350,470
Rp285,000
Rp5,490,000
Rp132,000
Rp8,200,000
Rp425,000
Rp166,050
Rp10,710
Rp128,440
Rp1,074,840
Rp2,577,424
Rp216,000 0.771
Rp352,800 0.171
Rp124,538 0.482
Rp37,800 0.771
Rp38,325 0.15
Rp528,750 1.286
Rp11,248 0.161
Rp4,850,000 0.143
Rp28,433,181 Jumlah
1
XII P
XII.1
Tukang batu
Kepala tukang batu
Pekerja
XII.2 Mandor
XII.4 Bak
Tukang batu
XII.5 Bathtub
Tukang batu
XII.6 Keran
Pekerja
Mandor
XII.7 Kloset Duduk
Tukang batu
Kepala tukang batu
Pekerja
Mandor
Pekerja
Tukang batu
Kepala tukang batu
Mandor
XII.10 Pompa Zet Pump
Pekerja
Mandor
No.
1
XII PEKERJAAN INSTALASI AIR DAN SANITASI
XII.1 Pipa PVC 1''
Pipa PVC maspion abu diameter 1" (AW)
XII.4 Bak
Bak fiberglass
XII.5 Bathtub
Bathtube standard
XII.6 Keran
Kran stainless lokal kait
XII.9 Septictank
Galian tanah
Pasir urug
Lantai kerja t = 10 cm
Pas. Bata 1 PC : 2 PS + plesteran
Plat beton penutup dan balok
Pipa PVC 4" jenis AW + sambungan
Pipa GIP 1 1/2"
Galian tanah untuk rembesan
Pas.ijuk
Urugan kerikil 3,5 cm
Pipa PVC 4" berlobang jenis AW
Urugan kembali perataan tanah
47.000 m'
47 m'
47 m'
47 m'
47 m'
47 m'
47 m'
47 m'
60 m'
60 m'
60 m'
60 m'
3.000 bh
3 bh
3 bh
3 bh
2.000 bh
2 bh
2 bh
2 bh
6.000 bh
6 bh
4.000 bh
4 bh
4 bh
4 bh
16.452
1.000 bh 0.990
1 bh
1 bh
1 bh
1 unit
1 unit
1 unit
10.24
1 unit
1 unit
6 7=5x4 7
unit 4.5 M3
unit 0.214 M3
unit 2.25 M2
unit 15 M2
unit 0.3 M3
unit 5.4 M1
unit 1.2 btg
unit 3.375 M3
unit 5.4 Kg
unit 1.05 M3
unit 9 M1
unit 1.125 M3
bh 1 unit
0.99 Rp48,000
0.009 Rp52,000
2.97 Rp38,000
0.144 Rp60,000
Jumlah
6.370 Rp38,000
2.7 Rp48,000
0.72 Rp52,000
0.45 Rp60,000
Jumlah
0.225 Rp38,000
0.113 Rp60,000
Jumlah
1.269
0.127
0.761 23.500 m'
0.038
1.269
0.127
0.761 23.500 m'
0.038
3.645
0.729
2.43 1.500 bh
0.149
1.62
0.324
1.08 0.667 bh
0.066
1.98
0.018
5.94 2.000 bh
0.288
0.99
0.009
2.97 1.000 bh
0.144
2
PEKERJAAN INSTALASI AIR DAN SANITASI
ECIL)
Jumlah Harga
han
Rp.
6
-
-
Rp2,880.00
Rp312.00
Rp1,368.00
Rp108.00
Rp4,668.00
-
-
Rp2,880.00
Rp312.00
Rp1,368.00
Rp108.00
Rp4,668.00
-
-
Rp1,520.00
Rp2,400.00
Rp3,920.00
Rp425,000.00
Rp51,000.00
Rp48,000.00
Rp52,000.00
Rp38,000.00
Rp60,000.00
Rp9,998.00
Rp38,000.00
Rp48,000.00
-
- Rp9,500.00
- Rp7,500.00
Rp17,000.00
t Kebutuhan Tenaga Kerja
8=5x6
0.702
0.07
0.421
0.021
1.214
0.378
0.038
0.227
0.011
0.654
0.486
0.049
0.292
0.015
0.841
4.860
0.972
3.24
0.198
9.27
4.860
0.972
3.24
0.198
9.27
0.216
0.216
0.432
1.980
0.018
5.94
0.288
8.226
0.990
0.009
2.97
0.144
4.113
6.370
2.7
0.72
0.45
10.24
0.225
0.113
0.338
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
m'
m'
bh
bh
bh
bh
bh 1.0000 2.00
bh 1.0000 6.00
bh 1.0000 2.00
bh 1.0000 1.00
M3 4.5000 1.00
M3 0.2142 1.00
M2 2.2500 1.00
M2 15.0000 1.00
M3 0.3000 1.00
M1 5.4000 1.00
btg 1.2000 1.00
M3 3.3750 1.00
Kg 5.4000 1.00
bh
6 bh
2 bh
1 bh
4.5 M3
0.214 M3
2.25 M2
15 M2
0.3 M3
5.4 M1
1.2 btg
3.375 M3
5.4 Kg
1.05
9
1.125
1 unit
Jenis Pekerja
Jenis Bahan
Rp119,427
Rp286,380
Rp24,000
Rp39,200
Rp13,838
Rp4,200
Rp4,258
Rp58,750
Rp1,250
Rp538,889
Rp2,338,894
URAIA
URAIAN
Pekerja
Tukang batu
Mandor
Jenis Bahan
Pekerja/ Biaya
Hari Upah/Hari
Rp188,646
Rp192,795
Rp29,912
0.320 Rp19,226
Jumlah Rp430,579
Jumlah
Bahan/H
ari
1.119
1.119
1.429
0.429
0.286
0.857
0.571
0.143
0.643
0.031
0.321
2.143
0.043
771 Rp30,857
171 Rp50,400
482 Rp17,791
771 Rp5,400
15 Rp5,475
286 Rp75,536
161 Rp1,607
143 Rp692,857
mlah Rp4,061,883
2
PEKERJAAN INSTALASI AIR DAN SANITASI Pipa PVC 1''
Uraian Jenis pekerjaan
2
2.538
0.254
1.523
0.076
4.391
2.538
0.254
1.523
0.076
4.391
3.24
0.324
1.944
0.097
5.605
7.290
1.458
4.86
0.297
13.905
4.860
0.972
3.24
0.198
9.27
0.216
0.216
0.432
3.960
0.036
11.88
0.576
0.009
2.97
0.144
4.113
2.7
0.72
0.45
0.225
0.113
0.338
Bahan
3 Rp36,900
3 Rp50,000
2 Rp57,085
2 Rp71,656
3 Rp8,591,413
1 Rp40,000
g Rp294,000
3 Rp36,900
Rp7,000
3 Rp36,500
1 Rp58,750
3 Rp9,998
Jumlah
unit Rp4,850,000
Rp47,520
Rp468
Rp112,860
Rp8,640
Rp169,488
Rp242,061
Rp129,600
Rp37,440
Rp27,000
Rp436,101
Rp8,550
Rp6,750
Rp15,300
3
bt
lot
Oh
Oh
Oh
Oh
bt
lot
Oh
Oh
Oh
Oh
bt
lot
Oh
Oh
Oh
Oh
bh
lot
Oh
Oh
Oh
Oh
bh
Oh
Oh
bh
Oh
Oh
Upah
Rp.
7
-
Rp10,500.00
-
-
-
- Rp10,500.00
-
Rp53,550.00
-
-
-
- Rp53,550.00
-
Rp82,250.00
-
-
-
- Rp82,250.00
-
Rp33,250.00
-
-
-
- Rp33,250.00
Rp960,750.00
-
-
-
- Rp960,750.00
-
Rp1,320.00
-
- Rp1,320.00
Rp123,000.00
- Rp123,000.00
Rp425,000.00
-
-
-
-
-
Rp425,000.00
Rp166,050.00
Rp10,710.00
Rp128,440.19
Rp1,074,840.00
Rp2,577,423.78
Rp216,000.00
Rp352,800.00
Rp124,537.50
Rp37,800.00
Rp38,325.00
Rp528,750.00
Rp11,247.75
- R
- R
-
-
-
Rp0.00
AN
Jumlah
AN
Jumlah
Kebutuhan Tenaga Kerja
8=5x6
0.07
0.421
0.021
1.214
0.038
0.227
0.011
0.654
0.049
0.292
0.015
0.841
0.972
3.24
0.198
9.27
0.972
3.24
0.198
9.27
Oh 0.702
Oh 0.07
Oh 0.421
Oh 0.021
Oh 0.378
Oh 0.038
Oh 0.227
Oh 0.011
Oh 0.486
Oh 0.049
Oh 0.292
Oh 0.015
4.86
0.972
3.24
0.198
Oh 4.86
Oh 0.972
Oh 3.24
Oh 0.198
0.216
0.216
Oh 1.98
Oh 0.018
Oh 5.94
Oh 0.288
Oh 0.99
Oh 0.009
Oh 2.97
Oh 0.144
0.225
0.113
0.351
0.035
0.211
0.011
0.189
0.019
0.113
0.006
2.43
0.486
1.62
0.099
1.62
0.324
1.08
0.066
0.99
0.009
2.97
0.144
0.99
0.009
2.97
0.144
Uraian Jenis pekerjaan
2
Rp2,745,000
Rp22,000
Rp2,050,000
Rp425,000
M3 Rp36,900
M3 Rp50,000
M2 Rp57,085
M2 Rp71,656
M3 Rp8,591,413
M1 Rp40,000
btg Rp294,000
M3 Rp36,900
Kg Rp7,000
M3 Rp36,500
M1 Rp58,750
M3 Rp9,998
Jumlah
Rp4,850,000
Jumlah
Bahan
Jumlah
N PEKERJA AN
Jumlah
URAIAN PEKERJAAN
Jumlah
Pekerja
ukang batu
Mandor
Jenis Bahan
ari
6
79
Biaya
Bahan/Hari
Rp33,578
Rp171,249
Rp335,781
Rp40,714
Rp784,286
Rp18,857
Rp1,171,429
Rp60,714
Rp23,721
Rp1,530
Rp18,349
Rp153,549
Rp368,203
Jumlah
Jumlah
Jumlah
Jumlah
Jumlah
Jumlah
Jumlah
Jumlah
bt
bt
bt
bh
bh
bh
bh
bh
M3
bh
Tukang batu
Kepala tukang batu
XII.4 Bak
Tukang batu
Kepala tukang batu
XII. 5 Bathtub
Tukang batu
Kepala tukang batu
XII.6 Keran
XII.7 Kloset Duduk
Tukang batu
Kepala tukang batu
XII.9 Septictank
RAB Bahan
9
1
1
3
bt
lot
Oh
Oh
Oh
Oh
bt
lot
Oh
Oh
Oh
Oh
bt
lot
Oh
Oh
Oh
Oh
bh
lot
Oh
Oh
Oh
Oh
bh
lot
Oh
Oh
Oh
Oh
bh
lot
Oh
Oh
bh
lot
Oh
Oh
Oh
Oh
bh
lot
Oh
Oh
Oh
Oh
M3
M3
M2
M2
M3
M1
btg
M3
Kg
M3
M1
M3
Oh
Oh
Alat
Rp.
8
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Rp188,320.00 Rp51,000.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- - p268,957.03
p144,000.00
VOL
13
7
9
2
2
6
2
1
1
1
VOL
13
7
9
2
2
6
2
1
1
1
Oh 0.04
Oh 0.04
Jumlah
Oh 1.1
Oh 0.01
Oh 3.3
Oh Jumlah 0.16
Oh 1.1
Oh 0.01
Oh 3.3
Oh Jumlah 0.16
Oh 7.078
Oh 3
Oh 0.8
Oh Jumlah 0.5
Oh 0.25
Oh Jumlah 0.125
2
1
1
8
8
7
1
6
9
2
5
Rp48,000
Rp52,000
Rp38,000
Rp60,000
6.5
3.5
1.000 bh
0.667
1.000 bh
pekerjaan
Rp5,490,000
Sat J
bt
1
1
1
Sat
bt
bt
bt
bh
bh
bh
bh
bh
M3
M3
M2
M2
M3
btg
Sat.
bt
bt
bt
bh
bh
bh
bh
Pekerja
Mandor
Pekerja
Mandor
Pekerja
Mandor
Pekerja
Mandor
Pekerja
Mandor
Pekerja
Mandor
Pekerja
Mandor
Pekerja
Mandor
Pekerja
Tukang batu
Mandor
Pekerja
Mandor
B Bahan
Rp166,050
Rp10,710
Rp128,440
Rp1,074,840
Rp2,577,424
Rp216,000
Rp352,800
Rp124,538
Rp37,800
Rp38,325
Rp528,750
Rp11,248
Rp5,266,924
Rp4,850,000
1 bh
1.000 unit
1
2.7
0.54
1.8
0.11
1.000
1
0.04
0.04
1.000
1
1.1
0.01
3.3
0.16
1.000
1
1.1
0.01
3.3
0.16
4.5
0.214
2.25
15
0.3
5.4
1.2
3.375
5.4
1.05
9
1.125
7.078
3
0.8
0.5
1.000
0.25
0.125
7.03
VOL
13
7
9
2
2
6
2
1
1
1
VOL
13
7
9
2
2
6
2
1
1
1
0.04 0.036
0.04 0.036
1.1 0.99
0.01 0.009
3.3 2.97
0.16 0.144
1.1 0.99
0.01 0.009
3.3 2.97
0.16 0.144
7.078 6.37
3 2.7
0.8 0.72
0.5 0.45
0.25 0.225
0.125 0.1125
Rp48,000
Rp52,000
Rp38,000
Rp60,000
Jumlah
Rp48,000
Rp52,000
Rp38,000
Rp60,000
Jumlah
Rp48,000
Rp52,000
Rp38,000
Rp60,000
Jumlah
Rp48,000
Rp52,000
Rp38,000
Rp60,000
Rp38,000
Rp60,000
Rp48,000
Rp52,000
Rp38,000
Rp60,000
Rp48,000
Rp52,000
Rp38,000
Rp60,000
Jumlah
Rp38,000
Rp60,000
,490,000
Rp132,000
Rp4,100,000
Rp425,000
Rp166,050
Rp10,710
Rp128,440
Rp1,074,840
Rp2,577,424
Rp216,000
Rp352,800
Rp124,538
Rp37,800
Rp38,325
Rp528,750
Rp11,248
Rp5,266,924
Rp4,850,000
Sat Jumlah Pekerja
Oh 23.141
Oh 16.956
Oh
Oh
bt
bt
bh
bh
bh
bh
bh
M3
M3
M2
M2
M3
M1
btg
M3
Kg
M3
M1
M3
bh
VOL
47
47
60
3
2
6
4
1
1
1
Sat Jumlah Pekerja
Oh 34.751
Oh 28.116
Oh 4.027
Oh 2.243
bt 7.835
bt 7.835
bt 10.002
bh 3
bh 2
bh 6
bh 4
bh 1
M3 4.5
M3 0.214
M2 2.25
M2 15
M3 0.3
M1
M3
Kg
M3
M1
M3
bh
3
Oh 0.06
Oh 0.006
Oh 0.036
Oh 0.0018
Oh 0.06
Oh 0.006
Oh 0.036
Oh 0.0018
Oh 0.06
Oh 0.006
Oh 0.036
Oh 0.0018
Oh 2.7000
Oh 0.54
Oh 1.8
Oh 0.11
Oh 2.7000
Oh 0.54
Oh 1.8
Oh 0.11
Oh 0.0400
Oh 0.04
Oh 1.1
Oh 0.01
Oh 3.3
Oh 0.16
Oh 1.1000
Oh 0.01
Oh 3.3
Oh 0.16
Jumlah
Oh 7.078
Oh 3
Oh 0.8
Oh 0.5
Jumlah
Oh 0.25
Oh 0.125
0.1667
0.1667
0.1667
1.0000
1.0000
1.0000
1.0000
1.0000
4.5000
M3 0.2142
M2 2.25
M2 15
M3 0.3
M1 5.4
btg 1.2
M3 3.375
Kg 5.4
M3 1.05
M1 9
M3 1.125
1.0000
(Hari)
10
4
0.167
1
0.06
0.006
0.036
0.002
0.167
1
0.06
0.006
0.036
0.002
0.167
1
0.06
0.006
0.036
0.002
1.000
1
2.7
0.54
1.8
0.11
1.000
Rp52,800.00
SAT
4
m' Rp5,001
m' Rp25,505
m' Rp39,175
bh Rp95,000
bh Rp2,745,000
bh Rp22,000
bh Rp2,050,000
bh Rp425,000
unit Rp5,266,924
unit Rp4,850,000
SAT
m' Rp4,668
m' Rp4,668
m' Rp4,668
bh Rp232,680
bh Rp232,680
bh Rp3,920
bh Rp188,320
bh Rp188,320
unit Rp484,557
unit Rp17,000
6
6
9
4
5
25
Rp233,280
Rp50,544
Rp123,120
Rp11,880
m'
m'
bh
bh
bt
mlah Pekerja
.141
.956
2.848
1.653
1.167
1.5
2
2
6
2
1
4.5
0.214
2.25
15
0.3
5.4
1.2
3.375
5.4
1.05
9
1.125
1
SAT
4
m'
m'
m'
bh
bh
bh
bh
bh
unit
unit
VOL SAT
3 4
47 m'
47 m'
60 m'
3 bh
2 bh
6 bh
4 bh
bh
unit
unit
5.4
1.2
3.375
5.4
1.05
9
1.125
1
4 5
0.054
0.0054
0.0324
0.0016
0.054
0.0054
0.0324
0.0016
0.054
0.0054
0.0324
0.0016
2.4300
0.486
1.62
0.099
2.4300
0.486
1.62
0.099
0.0360
0.036
0.99
0.009
2.97
Koeff.
47.00
47.00
60.00
3.00
2.00
6.00
4.00
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
2
- -
- Rp51,000.00
Rp52,800.00 - Rp520.00 - Rp125,400.00 - Rp9,600.00 -
BAHAN
5
5,001
25,505
39,175
95,000
2,745,000
22,000
2,050,000
425,000
5,266,924
4,850,000
UPAH
5
4,668
4,668
4,668
232,680
232,680
3,920
188,320
188,320
484,557
17,000
Rp233,280
Rp50,544
Rp123,120
Rp11,880
Rp95,040
Rp936
Rp225,720
Rp17,280
Rp47,520
Rp468
Rp112,860
Rp8,640
Rp169,488
2
0.525
4.5
0.563
2.848
1.653
umlah Bahan
2.167
T BAHAN
5
Rp5,001
Rp25,505
Rp39,175
Rp95,000
Rp2,745,000
Rp22,000
Rp2,050,000
Rp425,000
t Rp5,266,924
t Rp4,850,000
T UPAH
5
' Rp4,668
' Rp4,668
' Rp4,668
h Rp232,680
h Rp232,680
h Rp3,920
h Rp188,320
Rp188,320
Rp484,557
Rp17,000
Sat
Oh
Oh
Oh
Oh
Sat
bt
bt
bt
bh
bh
bh
bh
bh
M3
M3
M2
M2
M3
M1
btg
M3
Kg
M3
M1
M3
bh
5
0.054
0.0054
0.0324
0.0016
0.054
0.0054
0.0324
0.0016
0.054
0.0054
0.0324
0.0016
2.4300
0.486
1.62
0.099
2.4300
0.486
1.62
0.099
0.0360
0.036
0.99
0.009
2.97
0.144
0.9900
0.009
2.97
0.144
6.37
2.7
0.72
0.45
0.225
0.1125
Volume
00
00
00
1.00
1.00
1
1
1
1
1
1
1
1
1
1
1
1.00
Biaya Bahan Bid Price
6
Rp65,013.00
Rp178,535.70
Rp352,570.50
Rp190,000.00
Rp5,490,000.00
Rp132,000.00
Rp4,100,000.00
Rp425,000.00
Rp5,266,924.22
Rp4,850,000.00
Rp21,050,043
Biaya Upah Bid Price
6
Rp60,684.00
Rp32,676.00
Rp42,012.00
Rp465,360.00
Rp465,360.00
Rp23,520.00
Rp376,640.00
Rp188,320.00
Rp484,557.03
Rp17,000.00
Rp2,156,129
Rp33,696
Rp3,650
Rp16,006 2
Rp1,264
Rp54,616
Rp18,144
Rp1,966
Rp8,618 2
Rp680
Rp29,408
Rp23,328
Rp2,527
Rp11,081
Rp875
Rp37,811
Rp8,208
Rp12,960 1
Rp8,550
Rp6,750 1
Sat. Koeff. Vol
3 4 5
bt 0.1667 13
bt 0.1667 7
0.1667 9.00
bh 1 2
M3 1.05
M1 9
M3 1.125
bh 1
2.25 M3
0.107 M3
1.125 M2
7.5 M2
0.15 M3
2.7 M1
0.6 btg
1.688 M3
2.7 Kg
M3
M1
M3
Sat Bahan
Rp30,000
bt
bt Rp153,000
bt Rp235,000
bh Rp95,000
bh Rp2,745,000
bh Rp22,000
bh Rp2,050,000
bh Rp425,000
M3 Rp36,900
M3 Rp50,000
M2 Rp57,085
M2 Rp71,656
M3 Rp8,591,413
M1 Rp40,000
btg Rp294,000
M3 Rp36,900
Kg Rp7,000
M3 Rp36,500
M1 Rp58,750
M3 Rp9,998
bh Rp4,850,000
BAHAN Biaya Bahan Bid P
5 6
Rp235,047.00
Rp1,198,739.70
Rp2,350,470.00
Rp285,000.00
Rp5,490,000.00
Rp132,000.00
Rp8,200,000.00
Rp425,000.00
Rp5,266,924.22
Rp4,850,000.00
Rp28,433,181
UPAH Biaya Upah Bid Pr
5 6
Rp219,396.00
Rp219,396.00
Rp280,080.00
Rp698,040.00
Rp465,360.00
Rp23,520.00
Rp753,280.00
Rp188,320.00
Rp484,557.03
Rp17,000.00
Rp3,348,949
t Harga Satuan Upah
Rp38,000
Rp48,000
Rp52,000
Rp60,000
Jumlah
Rp30,000
Rp153,000
Rp235,000
Rp95,000
Rp2,745,000
Rp22,000
Rp2,050,000
Rp425,000
Rp36,900
Rp50,000
Rp57,085
Rp71,656
Rp8,591,413
Rp40,000
Rp294,000
Rp36,900
Rp7,000
Rp36,500
Rp58,750
Rp9,998
Rp4,850,000
Jumlah
Price
h Bid Price
Volume
13
9.00
2
1
1
1
M3
M3
M2
M2
M3
M1
btg
M3
Kg
M3
M1
M3
Harga Satu
Upah
Rp38,000
Rp48,000
Rp52,000
Rp60,000
Bahan
Rp30,000
Biaya Bahan Bid Price
6
0.00
7.03
00
49
0,000
mlah