6
KERTAS KERJA PERHITUNGAN PAJAK DAN BIAYA ATRIBUSI
A. Perhitungan Pajak
PERHITUNGAN HARGA SETELAH PAJAK PEMBAGIAN BIAYA ATRIBUSI @ SETELAH PAJAK JUMLAH SETELAH PAJAK DAN
No. NAMA BARANG QTY @ JUMLAH DAN ATRIBUSI ATRIBUSI
PPN Pembulatan VAT @ VAT ATRIBUSI* Pembulatan ATRIBUSI ' @ATRIBUSI
1 Komputer 5.00 4,750,000.00 23,750,000.00 26,125,000.00 26,125,000.00 5,225,000.00 261,100.00 261,100.00 52,220.00 5,277,220.00 26,386,100.00
2 Notebook 7.00 5,250,000.00 36,750,000.00 40,425,000.00 40,425,000.00 5,775,000.00 404,000.00 404,000.00 57,714.29 5,832,714.29 40,829,000.00
3 Proyektor 8.00 6,750,000.00 54,000,000.00 59,400,000.00 59,400,000.00 7,425,000.00 593,600.00 593,600.00 74,200.00 7,499,200.00 59,993,600.00
4 Sound System 9.00 3,500,000.00 31,500,000.00 34,650,000.00 34,650,000.00 3,850,000.00 346,300.00 346,300.00 38,477.78 3,888,477.78 34,996,300.00
5 Screen 8.00 2,500,000.00 20,000,000.00 22,000,000.00 22,000,000.00 2,750,000.00 219,800.00 219,800.00 27,475.00 2,777,475.00 22,219,800.00
6 Printer 10.00 2,000,000.00 20,000,000.00 22,000,000.00 22,000,000.00 2,200,000.00 219,800.00 219,800.00 21,980.00 2,221,980.00 22,219,800.00
7 Hardisk 10.00 755,250.00 7,552,500.00 8,307,750.00 (7,750.00) 8,300,000.00 830,000.00 82,900.00 82,900.00 8,290.00 838,290.00 8,382,900.00
8 - - - - - - - - -
9 - - - - - - - - -
10 - - - - - - - - -
11 - - - - - - - - -
12 - - - - - - - - -
13 - - - - - - - - -
14 - - - - - - - - -
15 - - - - - - - - -
JUMLAH 57.00 193,552,500.00 212,907,750.00 (7,750.00) 212,900,000.00 2,127,500.00 - 2,127,500.00 215,027,500.00
JUMLAH DIBAYAR 212,900,000.00 (7,750.00) 2,127,500.00 - 215,027,500.00
SELISIH PEMBULATAN (7,750.00) - - -
Dokumen Pendukung
Kode_Prog._d Kode_Reke Harga_Satua EXTRA_COUNT BIAYA_ATRIBU Kondisi_Barang_ Lokasi_Barang_
Tanggal No._Reg._Manual No._Reg._SIPKD Uraian Qty Jumlah ASET_TETAP SPJ_UP/_GU/_TU SPJ_LS_Barang
an_Keg. ning n ABLE SI Saat_Diterima Ditempatkan
/RK/001/1/2014 Tgl. BKP No. BKP Tgl. SPK No. SPK
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
JUMLAH - - - -
-
- -
NIP. NIP.
MUTASI DARI SKPD/ UPT LAIN
0
Per : 30-Dec-99
Dokumen Pendukung
Kode_Reke Harga_Satua Jumlah_Dari- Kondisi_Barang_S Lokasi_Barang_
Tanggal No._Reg._Manual No._Reg._SIPKD Uraian Qty BERITA ACARA/ SK
ning n Mutasi_Internal aat_Diterima Ditempatkan
/ITL/001/1/2014 Tgl. BA/ SK No. BA/ SK
1 2 3 4 5 6 7 8 9 10 11 12
JUMLAH -
Mengetahui : 30-Dec-99
PB/ KPB Pengurus Barang/ Pembantu
- -
NIP. NIP.
MUTASI DARI HIBAH/ BARANG DALAM PENGUASAAN
0
Per : 30-Dec-99
Dokumen Pendukung
Kode_Reke Harga_Satua Jumlah_Barang Kondisi_Barang_S Lokasi_Barang_
Tanggal No._Reg._Manual No._Reg._SIPKD Uraian Qty BERITA ACARA/ SK
ning n _Dihibahkan aat_Diterima Ditempatkan
/HBH/001/1/2014 Tgl. BA/ SK No. BA/ SK
1 2 3 4 5 6 7 8 9 10 11 12
JUMLAH -
Mengetahui : 30-Dec-99
PB/ KPB Pengurus Barang/ Pembantu
- -
NIP. NIP.
PENGHAPUSAN ASET TETAP
0
Per : 30-Dec-99
Dokumen Pendukung
Kode_Reke Harga_Satua Jumlah_Pengha Kondisi_Barang_S Lokasi_Barang_
Tanggal No._Reg._Manual No._Reg._SIPKD Uraian Qty BERITA ACARA/ SK
ning n pusan aat_Diterima Ditempatkan
/HPS/001/1/2014 Tgl. BA/ SK No. BA/ SK
1 2 3 4 5 6 7 8 9 10 11 12
JUMLAH -
Mengetahui : 30-Dec-99
PB/ KPB Pengurus Barang/ Pembantu
- -
NIP. NIP.
LAPORAN MUTASI ASET TETAP TAHUN 2014
0
30-Dec-99
MUTASI_DARI_HIBAH
TREATMENT_SALDO_ REALISASI_BELANJA_ MUTASI_TAMBAH_AS KAPITALISASI_/_EXTR MUTASI_DARI_SKPD/ PENGHAPUSAN_ASET
Kode_ASET URAIAN SALDO_AWAL AWAL MODAL ET_TETAP A_COUNTABLE BIAYA_ATRIBUSI REKLASSIFIKASI _UPT_LAIN /_BARANG_DALAM_P _TETAP SALDO_AKHIR
ENGUASAAN
1 2 3 4 5 6 7 8 9 10 11 12 13
1.3.1 A. Tanah - - - - - - - - - - -
1.3.1.01. Tanah - - - - - - - - -
JUMLAH - - - - - - - - - - -
Cek (101,735,500) - - -
- -
NIP. NIP.
BELANJA
BELANJA
No. Rekening Uraian
5 BELANJA
5 2 3 BELANJA MODAL
5 2 3 01 Belanja Modal Pengadaan Tanah
5 2 3 01 01 Belanja modal pengadan tanah kantor
5 2 3 01 02 Belanja modal pengadaan tanah sarana kesehatan rumah sakit
5 2 3 01 03 Belanja modal pengadaan tanah sarana kesehatan puskesmas
5 2 3 01 04 Belanja modal pengadaan tanah sarana kesehatan poliklinik
5 2 3 01 05 Belanja modal pengadaan tanah sarana pendidikan taman kanak-ka
5 2 3 01 06 Belanja modal pengadaan tanah sarana pendidikan sekolah dasar
5 2 3 01 07 Belanja modal pengadaan tanah sarana pendidikan menengah umum
5 2 3 01 08 Belanja modal pengadaan tanah sarana pendidikan menengah lanju
5 2 3 01 09 Belanja modal pengadaan tanah sarana pendidikan luar biasa/khu
5 2 3 01 10 Belanja modal pengadaan tanah sarana pendidikan pelatihan dan
5 2 3 01 11 Belanja modal pengadaan tanah sarana sosial panti asuhan
5 2 3 01 12 Belanja modal pengadaan tanah sarana sosial panti jompo
5 2 3 01 13 Belanja modal pengadaan tanah sarana umum terminal
5 2 3 01 14 Belanja modal pengadaan tanah sarana umum dermaga
5 2 3 01 15 Belanja modal pengadaan tanah sarana umum lapangan terbang per
5 2 3 01 16 Belanja modal pengadaan tanah sarana umum rumah potong hewan
5 2 3 01 17 Belanja modal pengadaan tanah sarana umum tempat pelelangan ik
5 2 3 01 18 Belanja modal pengadaan tanah sarana umum pasar
5 2 3 01 19 Belanja modal pengadaan tanah sarana umum tempat pembuangan ak
5 2 3 01 20 Belanja modal pengadaan tanah sarana umum taman
5 2 3 01 21 Belanja modal pengadaan tanah sarana umum pusat hiburan rakyat
5 2 3 01 22 Belanja modal pengadaan tanah sarana umum ibadah
5 2 3 01 23 Belanja modal pengadaan tanah sarana umum stadion olah raga
5 2 3 01 24 Belanja modal pengadaan tanah perumahan
5 2 3 01 25 Belanja modal pengadaan tanah pertanian
5 2 3 01 26 Belanja modal pengadaan tanah perkebunan
5 2 3 01 27 Belanja modal pengadaan tanah perikanan
5 2 3 01 28 Belanja modal pengadaan tanah peternakan
5 2 3 01 29 Belanja modal pengadaan tanah perkampungan
5 2 3 01 30 Belanja modal pengadaan tanah pergudangan/tempat penimbunan ma
5 2 3 01 31 Belanja modal pengadaan tanah untuk jalan
5 2 3 01 32 Belanja modal pengadaan tanah untuk jaringan air
5 BELANJA
5 BELANJA
5 BELANJA
5 BELANJA
5 BELANJA
5 BELANJA
5 BELANJA
5 BELANJA
Dokumen Pendukung
Kode_Reke Jumlah_Dari- Kondisi_Barang_S Lokasi_Barang_
Tanggal No._Reg._Manual Uraian Qty Harga_Satuan BERITA ACARA SEMENTARA
ning Mutasi_Internal aat_Diterima Ditempatkan
Tgl. BA/ SK No. BA/ SK
1 2 3 4 5 6 7 8 9 10 11
JUMLAH -
Mengetahui : 30-Dec-99
PB/ KPB Pengurus Barang/ Pembantu
- -
NIP. NIP.
MUTASI DARI HIBAH/ BARANG DALAM PENGUASAAN
0
Per : 30-Dec-99
Dokumen Pendukung
Kode_Reke Jumlah_Barang_Dihibahk Kondisi_Barang_S Lokasi_Barang_
Tanggal No._Reg._Manual Uraian Qty Harga_Satuan BERITA ACARA SEMENTARA
ning an aat_Diterima Ditempatkan
Tgl. No.
1 2 3 4 5 6 7 8 9 10 11
JUMLAH -
Mengetahui : 30-Dec-99
PB/ KPB Pengurus Barang/ Pembantu
- -
NIP. NIP.
DRAFT ASET TETAP RUSAK BERAT
0
Per : 30-Dec-99
1 2 3 4 5 6 7 8
JUMLAH
Mengetahui : 30-Dec-99
PB/ KPB Pengurus Barang/ Pembantu
- -
NIP. NIP.
BELANJA
BELANJA NERACA
5 2 3 03 Belanja Modal Pengadaan Alat-alat Angkutan Darat Bermotor 1 3 2 02 Alat-alat Angkutan Darat Bermotor
5 2 3 03 01 Belanja modal pengadaan alat-alat angkutan darat bermotor seda 1 3 2 02 01 Alat-alat angkutan darat bermotor sedan
5 2 3 03 02 Belanja modal pengadaan alat-alat angkutan darat bermotor jeep 1 3 2 02 02 Alat-alat angkutan darat bermotor jeep
5 2 3 03 03 Belanja modal pengadaan alat-alat angkutan darat bermotor stat 1 3 2 02 03 Alat-alat angkutan darat bermotor station wagon
5 2 3 03 04 Belanja modal pengadaan alat-alat angkutan darat bermotor bus 1 3 2 02 04 Alat-alat angkutan darat bermotor bus
5 2 3 03 05 Belanja modal pengadaan alat-alat angkutan darat bermotor micr 1 3 2 02 05 Alat-alat angkutan darat bermotor micro bus
5 2 3 03 06 Belanja modal pengadaan alat-alat angkutan darat bermotor truc 1 3 2 02 06 Alat-alat angkutan darat bermotor truck
5 2 3 03 07 Belanja modal pengadaan alat-alat angkutan darat bermotor tang 1 3 2 02 07 Alat-alat angkutan darat bermotor tangki (air, minyak, tinja)
5 2 3 03 08 Belanja modal pengadaan alat-alat angkutan darat bermotor boks 1 3 2 02 08 Alat-alat angkutan darat bermotor boks
5 2 3 03 09 Belanja modal pengadaan alat-alat angkutan darat bermotor pick 1 3 2 02 09 Alat-alat angkutan darat bermotor pickup
5 2 3 03 10 Belanja modal pengadaan alat-alat angkutan darat bermotor ambu 1 3 2 02 10 Alat-alat angkutan darat bermotor ambulance
5 2 3 03 11 Belanja modal pengadaan alat-alat angkutan darat bermotor pema 1 3 2 02 11 Alat-alat angkutan darat bermotor pemadam kebakaran
5 2 3 03 12 Belanja modal pengadaan alat-alat angkutan darat bermotor sepe 1 3 2 02 12 Alat-alat angkutan darat bermotor sepeda motor
5 2 3 03 13 Belanja modal pengadaan alat-alat angkutan darat bermotor lift 1 3 2 02 13 Alat-alat angkutan darat bermotor lift/elevator
5 2 3 03 14 Belanja modal pengadaan alat-alat angkutan darat bermotor teng 1 3 2 02 14 Alat-alat angkutan darat bermotor tangga berjalan
5 2 3 04 Belanja Modal Pengadaan Alat-alat Angkutan Darat Tidak Bermoto 1 3 2 03 Alat-alat Angkutan Darat Tidak Bermotor
5 2 3 04 01 Belanja modal pengadaan gerobak 1 3 2 03 01 Gerobak
5 2 3 04 02 Belanja modal pengadaan pedati/delman/dokar/bendi/cidomo/andon 1 3 2 03 02 Pedati/delman/dokar/bendi/cidomo/andong
5 2 3 04 03 Belanja modal pengadaan becak 1 3 2 03 03 Becak
5 2 3 04 04 Belanja modal pengadaan sepeda 1 3 2 03 04 Sepeda
5 2 3 04 05 Belanja modal pengadaan karavan 1 3 2 03 05 Karavan
BELANJA NERACA
5 2 3 05 Belanja Modal Pengadaan Alat-alat Angkutan di Air Bermotor 1 3 2 04 Alat-alat Angkutan di Air Bermotor
5 2 3 05 01 Belanja modal pengadaan kapal motor 1 3 2 04 01 Kapal motor
5 2 3 05 02 Belanja modal pengadaan kapal feri 1 3 2 04 02 Kapal feri
5 2 3 05 03 Belanja modal pengadaan speed boat 1 3 2 04 03 Speed boat
5 2 3 05 04 Belanja modal pengadaan motor boat/motor tempel 1 3 2 04 04 Motor boat/motor tempel
5 2 3 05 05 Belanja modal pengadaan hydro foil 1 3 2 04 05 Hydro foil
5 2 3 05 06 Belanja modal pengadaan jet foil 1 3 2 04 06 Jet foil
5 2 3 05 07 Belanja modal pengadaan kapal tug boat 1 3 2 04 07 Kapal tug boat
5 2 3 05 08 Belanja modal pengadaan kapal tenker 1 3 2 04 08 Kapal tanker
5 2 3 05 09 Belanja modal pengadaan kapal kargo 1 3 2 04 09 Kapal kargo
5 2 3 06 Belanja Modal Pengadaan Alat-alat Angkutan di Air Tidak Bermot 1 3 2 05 Alat-alat Angkutan di Air Tidak Bermotor
5 2 3 06 01 Belanja modal pengadaan perahu layar 1 3 2 05 01 Perahu layar
5 2 3 06 02 Belanja modal pengadaan perahu sampan 1 3 2 05 02 Perahu sampan
5 2 3 06 03 Belanja modal pengadaan perahu tongkang 1 3 2 05 03 Perahu tongkang
5 2 3 06 04 Belanja modal pengadaan perahu karet 1 3 2 05 04 Perahu karet
5 2 3 06 05 Belanja modal pengadaan perahu rakit 1 3 2 05 05 Perahu rakit
5 2 3 06 06 Belanja modal pengadaan perahu sekoci 1 3 2 05 06 Perahu sekoci
5 2 3 09 Belanja Modal Pengadaan Alat-alat Pengolahan Pertanian dan Pet 1 3 2 08 Alat-alat Pengolahan Pertanian dan Peternakan
5 2 3 09 01 Belanaja modal pengadaan penggilingan hasil pertanian 1 3 2 08 01 Penggilingan hasil pertanian
5 2 3 09 02 Belanja modal pengadaan alat pengering gabah 1 3 2 08 02 Alat pengering gabah
5 2 3 09 03 Belanja modal pengadaan mesin bajak 1 3 2 08 03 Mesin bajak
5 2 3 09 04 Belanja modal pengadaan mesin kompresor 1 3 2 08 04 Mesin kompresor
5 2 3 15 Belanja Modal Pengadaan Penghias Ruangan Rumah Tangga 1 3 2 14 Penghias Ruangan Rumah Tangga
5 2 3 15 01 Belanja modal pengadaan lampu hias 1 3 2 14 01 Lampu hias
5 2 3 15 02 Belanja modal pengadaan jam dinding/meja 1 3 2 14 02 Jam dinding/meja
5 2 3 24 Belanja Modal Pengadaan Penerangan Jalan,Taman dan Hutan Kota 1 3 4 04 Penerangan Jalan, Taman dan Hutan Kota
5 2 3 24 01 Belanja modal pengadaan lampu hias jalan 1 3 4 04 01 Lampu hias jalan
5 2 3 24 02 Belanja modal pengadaan lampu hias taman 1 3 4 04 02 Lampu hias taman
5 2 3 24 03 Belanja modal pengadaan lampu penerang hutan kota 1 3 4 04 03 Lampu penerang hutan kota
5 2 3 24 04 Belanja modal pengadaan dan pemasangan lampu penerangan jalan 1 3 4 04 04 Lampu penerangan jalan
5 2 3 25 Belanja Modal Pengadaan Instlasi Listrik dan Telepon 1 3 4 05 Instalasi Listrik dan Telepon
5 2 3 25 01 Belanja Modal Pengadaan Instlasi Listrik 1 3 4 05 01 Instalasi Listrik
5 2 3 25 02 Belanja Modal Pengadaan Instlasi Telepon 1 3 4 05 02 Instalasi Telepon
5 2 3 28 Belanja Modal Pengadaan Barang bercorak Kesenian, Kebudayaan 1 3 5 02 Barang Bercorak Kesenian, Kebudayaan
5 2 3 28 01 Belanja modal pengadaan lukisan/foto 1 3 5 02 01 Lukisan/foto
5 2 3 28 02 Belanja modal pengadaan patung 1 3 5 02 02 Patung
5 2 3 28 03 Belanja modal pengadaan ukiran 1 3 5 02 03 Ukiran
5 2 3 28 04 Belanja modal pengadaan pahatan 1 3 5 02 04 Pahatan
5 2 3 28 05 Belanja modal pengadaan batu alam 1 3 5 02 05 Batu alam
5 2 3 28 06 Belanja modal pengadaan maket/miniatur/diorama 1 3 5 02 06 Maket/miniatur/diorama
5 2 3 28 07 Belanja modal gamelan/wayang 1 3 5 02 07 Gamelan/wayang
5 2 3 28 85 Belanja modal pengadaan alat musik 1 3 5 02 85 Alat musik
Per : 30-Dec-99
Kode_Prog._d Kondisi_Barang_
No. ASAL USUL Tanggal Kode_Rekening Jenis Nomor NO DPA Tgl DPA PENYEDIA KODE BARANG (KIB) Nama Barang Qty Harga satuan Jml Hrga BARU/ PENAMBAH NILAI (PN) Kode KIB I Kode KIB II Kode KIB III Kode KIB IV Kode KIB V SPJ_UP/_GU/_TU SPJ_LS_Barang Merek/Type
an_Keg. Saat_Diterima
Kontrak
7 8 9 10 Tgl. BKP No. BKP Tgl. SPK No. SPK
1 2 3 4 5 6 14 15 16 17 18 19 26
-