PEKERJAAN TANAH Galian pondasi batu kali Pengurugan dengan pasir urug
Start: 15/04/21 ID: 7 Start: 15/04/21 ID: 8 Start: 22/04/21 ID: 10
Finish: 27/04/21 Dur: 9 days Finish: 21/04/21 Dur: 5 days Finish: 22/04/21 Dur: 1 day
Comp: 0% Res: Res:
PEKERJAAN DINDING Pas. Dinding bata merah (5x11x22)cm tebal 1/2 batu
Pas.campuran
Dinding trans
1P
Start: 13/05/21 ID: 14 Start: 13/05/21 ID: 15 Start: 25/05/21
Finish: 26/05/21 Dur: 10 days Finish: 24/05/21 Dur: 8 days Finish: 26/05/21
Comp: 0% Res: Res:
Page 1
PEKERJAAN KUSEN PINTU DAN JENDELA Pembuatan dan p
Start: 25/05/21 ID: 36 Start: 25/05/21
Finish: 03/06/21 Dur: 8 days Finish: 25/05/21
Comp: 0% Res:
PEKERJAAN ATAP
Start: 02/06/21 ID: 41
Finish: 11/06/21 Dur: 8 days
Comp: 0%
PEKERJAAN LANGIT-LANGIT
Start: 04/06/21 ID: 46
Finish: 14/06/21 Dur: 7 days
Comp: 0%
PEMASANGAN KERAMIK
Start: 11/06/21 ID: 50
Finish: 21/06/21 Dur: 7 days
Comp: 0%
Page 2
PEKERJAAN PENGECATAN Pengecatan bidang kayu baru (sek. Avian)
Start: 04/06/21 ID: 60 Start: 04/06/21 ID: 61
Finish: 17/06/21 Dur: 10 days Finish: 04/06/21 Dur: 1 day
Comp: 0% Res:
Pemasangan insta
Start: 25/05/21
Finish: 25/05/21
Res:
PEKERJAAN PIPA
Start: 28/05/21 ID: 71
Finish: 31/05/21 Dur: 2 days
Comp: 0%
Page 3
Pembuatan kotak adukan uk. 40cm x 50cm x 25cm
Start: 14/04/21 ID: 6
Finish: 14/04/21 Dur: 1 day
Pas. Dinding transram (5x11x22)cm tebal 1/2 batu campuran 1PC : 3PP
Start: 25/05/21 ID: 16
Finish: 26/05/21 Dur: 2 days
kolom praktis 15x15 -pembesian -bekisting (2 x pakai) -cor beton 1 PC: 2PS : 3 Kr
Start: 25/05/21 ID: 20 Start: 25/05/21 ID: 22 Start: 28/05/21 ID: 23 Start: 02/06/21 ID: 21
Finish: 03/06/21 Dur: 8 days Finish: 26/05/21 Dur: 2 days Finish: 01/06/21 Dur: 3 days Finish: 03/06/21 Dur: 2 days
Res: Res: Res:
Ring balk 15x20 -bekisting (2 x pakai) -pembesian -cor beton 1 PC: 2PS : 3 Kr
Start: 25/05/21 ID: 28 Start: 25/05/21 ID: 31 Start: 28/05/21 ID: 30 Start: 31/05/21 ID: 29
Finish: 01/06/21 Dur: 6 days Finish: 26/05/21 Dur: 2 days Finish: 28/05/21 Dur: 1 day Finish: 01/06/21 Dur: 2 days
Res: Res: Res:
Pembuatan dan pemasangan kusen pintu dan jendela, kayu kruingPembuatan dan pemasangan daun pintu panel, kayu
Pembuatan
kruing dan pemasangan jendela kaca, kayu
Pemasangan
kruing kaca bening tebal 5mm
Start: 25/05/21 ID: 37 Start: 26/05/21 ID: 38 Start: 01/06/21 ID: 39 Start: 03/06/21 ID: 40
Finish: 25/05/21 Dur: 1 day Finish: 31/05/21 Dur: 4 days Finish: 02/06/21 Dur: 2 days Finish: 03/06/21 Dur: 1 day
Res: Res: Res:
Pemasangan rangka langit-langit 60x80 cm Pemasangan langit-langit gypsum Pemasangan list langit-langit
Start: 04/06/21 ID: 47 Start: 09/06/21 ID: 48 Start: 11/06/21 ID: 49
Finish: 08/06/21 Dur: 3 days Finish: 10/06/21 Dur: 2 days Finish: 14/06/21 Dur: 2 days
Res: Res: Res:
Pas. Ubin Keramik uk. 30x30 cm sek. Asia tile Pas. Ubin Keramik uk.
Start: 11/06/21 ID: 51 Start: 11/06/21
Finish: 21/06/21 Dur: 7 days Finish: 11/06/21
Res: Res:
Page 5
Pemasangan instalasi titik lampu Pemasangan lampu LE
Start: 08/06/21 ID: 65 Start: 11/06/21
Finish: 10/06/21 Dur: 3 days Finish: 15/06/21
Res: Res:
Pemasangan instalasi stop kontak Pemasangan saklar tunggal sek. Broco Pemasangan saklar double sek. Broco
Start: 25/05/21 ID: 66 Start: 26/05/21 ID: 69 Start: 26/05/21 ID: 70
Finish: 25/05/21 Dur: 1 day Finish: 26/05/21 Dur: 1 day Finish: 26/05/21 Dur: 1 day
Res: Res:
Pemasangan pipa PVC tipe AW diameter 1/2” Pemasangan pipa PVC tipe AW diameter 3/4” Pemasangan kran air stainlessteel
Start: 28/05/21 ID: 72 Start: 31/05/21 ID: 73 Start: 31/05/21 ID: 74
Finish: 28/05/21 Dur: 1 day Finish: 31/05/21 Dur: 1 day Finish: 31/05/21 Dur: 1 day
Res: Res: Res:
Page 6
Page 7
. Ubin Keramik uk. 20x20 cm sek. Asia tile
ID: 52
Dur: 1 day
Page 8
masangan lampu LED 9 watt sek. Philips Pemasangan lampu LED 3 watt sek. Philips
ID: 67 Start: 16/06/21 ID: 68
Dur: 3 days Finish: 16/06/21 Dur: 1 day
Res:
Page 9
Critical Critical Milestone Critical Summary Critical Inserted Critical Marked Critical External Project Summary Highlighted Noncritical
Project: PERENCANAAN RUMAH TIN
Date: Thu 08/07/21
Noncritical Milestone Summary Inserted Marked External Highlighted Critical
Page 10