Analisa Land
Analisa Land
A. TENAGA
B. BAHAN
C. PERALATAN
1. Bulldozer (E04) jam 23.7970 1,244,383.17 Rp 29,612,617.97
2. Chain Saw (E64) jam 11.1111 51,354.31 Rp 570,603.40
3 Alat Bantu Ls 1.0000 50,000.00 Rp 50,000.00