Under
As per provision of the MGNREGA guidelines 30% workers should be female. Moreover, as seen at the field
level 20% workers are found to be weak, old aged or physically challenged. On the basis of this assumption, 50%
workers will be able bodied persons & the remaining 50% workers will have low out turn.
Keeping in view the aforesaid considerations, the analysis of requirement of labour & Materials are
worked out in the preparation of SOR of Panchayat & Rural Development for MGNREGA. While preparing the
P & R.D.’s SOR, the SOR’s of APWD, Irrigation Department, Water Resources Department , Fishery Department,
SOR of Tripura Govt., West Bengal Govt. & IRC- Standard Data Book are referred to. Moreover, views & opinions
of some PDs & EEs of DRDAs are also considered while finalizing the SOR.
It is well known that the rates of different materials vary from district to district and place to place.
Districts have already been directed to finalise the rates for procurement of materials and accordingly the districts
will fix the rates. In this SOR the rates of materials & wages are not included. The rates of wages for Skilled /
Semi-skilled / Unskilled workers will be adopted as notified by the labour & Employment Department, Govt. of
Assam from time to time. Hence the item-wise rate is not worked out. Only analysis of requirement of labour and
materials are worked out. Against the items the quantity of labours and materials required per unit quantity of
works per day are also shown.
……….. i ………..
This analysis of requirement of labour and materials for different items computerized by
Sri Dhrubajyoti Sarmah & Sri William Kindo , is prepared by Sri Dhrubajyoti Sarmah , Jr. Engineer,
Pachim Kaliabor Development Block, Nagaon and Sri Bhagaban Das , Jr. Engineer of this office under the
guidance of Sri A. Rahman , Joint Director (Tech.), Panchayat & Rural Development : Assam, Juripar, Panjabari,
Guwahati-37.
The draft copy of ‘ SCHEDULE OF REQUIREMENT OF LABOUR & MATERIALS , 2010-11 ’ has been
approved by the Govt. of Assam, Panchayat & Rural Development Department, Dispur, Guwahati-06.
I hope this ‘ SCHEDULE OF REQUIREMENT OF LABOUR & MATERIALS , 2010-11 ’ will help in the
preparation of estimates under MGNREGA for all the districts.
……….. ii ………..
CERTIFICATE
C ertified that the ‘ SCHEDULE OF REQUIREMENT OF LABOUR &
West Bengal Govt. & IRC- Standard Data Book. Moreover, views & opinions
of some PDs & EEs of DRDAs are also considered while finalizing the SOR.
……….. iii………..
Quantity
Item No. Item of Work with Requirement of Labour & Materials
/labour/day
Item No. 1 Cutting jungles and trees up to 50cm girth including uprooting roots and stamps and
removing them from site of work etc., complete as directed.
A) Light Jungle
Requirement of Labour Unskilled .= 0.0311 No. /Sqm. 32.1543 Sqm./No.
B) Medium Jungle
Requirement of Labour Unskilled .= 0.0435 No. /Sqm. 22.9885 Sqm./No.
C) Heavy Jungle
Requirement of Labour Unskilled .= 0.0725 No. /Sqm. 13.7931 Sqm./No.
Item No. 2 A ) Felling and removing Bamboo clumps
Requirement of Labour Unskilled .= 0.7708 No. /Sqm. 1.2974 Sqm./No.
B ) Cutting trees including uprooting and removing where necessary.
i) 50cm to 100cm girth
Requirement of Labour Unskilled .= 0.5441 No. /Sqm. 1.8379 Sqm./No.
ii) 100cm to 150cm girth
Requirement of Labour Unskilled .= 1.3603 No. /Sqm. 0.7351 Sqm./No.
Item No. 3 Benching the existing rural road / embankment including light jungles, turfing up to
root level to ensure adequate compaction of soil and utilizing the soil obtained from
cutting as key and benching by breaking clods, dressing, ramming etc. complete as
directed.
Requirement of Labour Unskilled .= 0.0539 No. /Sqm. 18.5622 Sqm./No.
Item No. 4 Earthwork in filling in Road/Embankment etc. to the design section and grade by
obtaining earth from out side borrow pits and filling in uniform layer not exceeding
15cm thick including clearing light jungle, removing trees upto 15cm dia and uprooting
roots and stumps from the seat of embankment and borrow pit area, breaking clods not
more than 10mm cube, dressing and roughening the seat of embankment, profilling etc.,
lead up to 25M and lift up to 1.5M, complete as directed.
A) Ordinary Soil (Ordinary Soil means sandy soil, clay soil, loamy soil etc.)
Requirement of Labour Unskilled .= 0.5224 No. /Cum. 1.9142 Cum./No.
B) Hard Soil i) Soil with gravel or morum upto 50 mm size.
Requirement of Labour Unskilled .= 0.7400 No. /Cum. 1.3514 Cum./No.
C) Hard Soil ii ) Soil with gravel and boulders upto 30cm size
Requirement of Labour Unskilled .= 0.9468 No. /Cum. 1.0562 Cum./No.
Skilled .= 0.0816 No. /Cum. 12.2519 Cum./No.
Item No. 5 Excavation in soil in hilly area by manual means including cutting and trimming of
side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m
as directed.
Requirement of Labour Unskilled .= 0.5441 No. /Cum. 1.8379 Cum./No.
A) Extra lead for every 10m and extra lift for every 0.75m height
Requirement of Labour Unskilled .= 0.0342 No. /Cum. 29.2398 Cum./No.
Item No. 6 Excavation in ordinary rock using manual means including loading in a thala/cart
carrying of excavated materials to embankment site with a lead upto 1.5 m and a lead
upto 20 m as directed.
Requirement of Labour Unskilled .= 1.1971 No. /Cum. 0.8354 Cum./No.
…..Page - I…..
i) Foundation, footings, bases of columns, pile cap, raft and mass concrete works
etc. & Sides of tie beams, plinth beams, grade beams etc. at or below plinth level.
Requirement of Labour Unskilled .= 0.1828 No. /Sqm. 5.4705 Sqm./No.
Skilled .= 0.1450 No. /Sqm. 6.8966 Sqm./No.
Requirement of Materials Planks .= 0.0094 Cum. /Sqm.
Scantlings .= 0.0057 Cum. /Sqm.
Nail .= 0.200 Kg. /Sqm.
Item No. 22 Supplying, fitting, fixing and laying in position reinforcement in position in RCC works
including cutting, bending, cranking, binding with two plies 0.91mm ( 20 BWG ) black
annealed wire, hooking, tying complete as directed.
Requirement of Labour Unskilled .= 2.1765 No. /Qtl. 0.4595 Qtl./No.
Semi-Skilled .= 0.5000 No. /Qtl. 2.0000 Qtl./No.
Skilled .= 0.1250 No. /Qtl. 8.0000 Qtl./No.
Requirement of Materials Torsteel .= 1.05 Qtl. /Qtl.
Black Wire .= 1.00 Kg. /Qtl.
Item No. 23 P.C.C work in proportion 1 : 1.5 : 3 with hard broken stone agg. of size 6mm to 20mm
including curing with necessary timber shuttering, scaffolding where necessary,
complete as directed ( Shuttering, sacffolding cost will be paid separately )
A) Without Boat
Requirement of Labour Unskilled .= 0.3591 No. /Cum. 2.7847 Cum./No.
Skilled .= 0.1667 No. /Cum. 5.9988 Cum./No.
Requirement of Materials Boulder .= 1.0709 Cum. /Cum.
B) With Boat (In addition to Without Boat)
Hire of Country Boats of 25 qtls. with Boatman .= 0.1667 No. /Cum.
…..Page - XI…..
(Note : The figure in blue shown in the right hand side indicates the quantity of works to be done daily by a labour)
…..Page - XIII…..
LEAD
25 m
0.5224 No. 35 m
0.5387 No. 45 m 6.00
0.5550 No. 55 m
0.5713 No. 65 m 5.25
0.5876 No. 75 m
0.6039 No. 85 m 4.50
0.6202 No. 95 m
ROAD
0.6202 No.
0.6691 No. 125 m 3.00
0.6039 No.
LIFT
0.6854 No. 135 m
0.5876 No.
0.7017 No. 145 m 2.25
0.5713 No.
0.7180 No. 155 m
0.5550 No.
0.7343 No. 165 m 1.50
0.5387 No.
0.7506 No. 175 m `
0.5224 No.
0.7669 No. 185 m
0.7832 No. 195 m
0.7995 No.
ROAD
LEAD
25 m
0.7400 No. 35 m
0.7563 No. 45 m 6.00
0.7726 No. 55 m
0.7889 No. 65 m 5.25
0.8052 No. 75 m
0.8215 No. 85 m 4.50
0.8378 No. 95 m
ROAD
0.8378 No.
0.8867 No. 125 m 3.00
0.8215 No.
LIFT
0.9030 No. 135 m
0.8052 No.
0.9193 No. 145 m 2.25
0.7889 No.
0.9356 No. 155 m
0.7726 No.
0.9519 No. 165 m 1.50
0.7563 No.
0.9682 No. 175 m `
0.7400 No.
0.9845 No. 185 m
1.0008 No. 195 m
1.0171 No.
ROAD
LEAD
25 m
0.9468 No. 35 m
0.9631 No. 45 m 6.00
0.9794 No. 55 m
0.9957 No. 65 m 5.25
1.0120 No. 75 m
1.0283 No. 85 m 4.50
1.0446 No. 95 m
ROAD
1.0446 No.
1.0935 No. 125 m 3.00
1.0283 No.
LIFT
1.1098 No. 135 m
1.0120 No.
1.1261 No. 145 m 2.25
0.9957 No.
1.1424 No. 155 m
0.9794 No.
1.1587 No. 165 m 1.50
0.9631 No.
1.1750 No. 175 m `
0.9468 No.
1.1913 No. 185 m
1.2076 No. 195 m
1.2239 No.
ROAD
LEAD
25 m
0.5441 No. 35 m
0.5783 No. 45 m 6.00
0.6125 No. 55 m
0.6467 No. 65 m 5.25
0.6809 No. 75 m
0.7151 No. 85 m 4.50
0.7493 No. 95 m
ROAD
0.7493 No.
0.8519 No. 125 m 3.00
0.7151 No.
LIFT
0.8861 No. 135 m
0.6809 No.
0.9203 No. 145 m 2.25
0.6467 No.
0.9545 No. 155 m
0.6125 No.
0.9887 No. 165 m 1.50
0.5783 No.
1.0229 No. 175 m `
0.5441 No.
1.0571 No. 185 m
1.0913 No. 195 m
1.1255 No.
ROAD
LEAD
20 m
1.1971 No. 30 m
1.2506 No. 40 m 6.00
1.3041 No. 50 m
1.3576 No. 60 m 5.25
1.4111 No. 70 m
1.4646 No. 80 m 4.50
1.5181 No. 90 m
ROAD
1.5181 No.
1.6786 No. 120 m 3.00
1.4646 No.
LIFT
1.7321 No. 130 m
1.4111 No.
1.7856 No. 140 m 2.25
1.3576 No.
1.8391 No. 150 m
1.3041 No.
1.8926 No. 160 m 1.50
1.2506 No.
1.9461 No. 170 m `
1.1971 No.
1.9996 No. 180 m
2.0531 No. 190 m
2.1066 No.
ROAD
LEAD
25 m
0.4897 No. 35 m
0.5060 No. 45 m 6.00
0.5223 No. 55 m
0.5386 No. 65 m 5.25
0.5549 No. 75 m
0.5712 No. 85 m 4.50
0.5875 No. 95 m
ROAD
0.5875 No.
0.6364 No. 125 m 3.00
0.5712 No.
LIFT
0.6527 No. 135 m
0.5549 No.
0.6690 No. 145 m 2.25
0.5386 No.
0.6853 No. 155 m
0.5223 No.
0.7016 No. 165 m 1.50
0.5060 No.
0.7179 No. 175 m `
0.4897 No.
0.7342 No. 185 m
0.7505 No. 195 m
0.7668 No.
ROAD
LEAD
25 m
0.8271 No. 35 m
0.8434 No. 45 m 6.00
0.8597 No. 55 m
0.8760 No. 65 m 5.25
0.8923 No. 75 m
0.9086 No. 85 m 4.50
0.9249 No. 95 m
ROAD
0.9249 No.
0.9738 No. 125 m 3.00
0.9086 No.
LIFT
0.9901 No. 135 m
0.8923 No.
1.0064 No. 145 m 2.25
0.8760 No.
1.0227 No. 155 m
0.8597 No.
1.0390 No. 165 m 1.50
0.8434 No.
1.0553 No. 175 m `
0.8271 No.
1.0716 No. 185 m
1.0879 No. 195 m
1.1042 No.
ROAD
LEAD
25 m
0.9903 No. 35 m
1.0066 No. 45 m 6.00
1.0229 No. 55 m
1.0392 No. 65 m 5.25
1.0555 No. 75 m
1.0718 No. 85 m 4.50
1.0881 No. 95 m
ROAD
1.0881 No.
1.1370 No. 125 m 3.00
1.0718 No.
LIFT
1.1533 No. 135 m
1.0555 No.
1.1696 No. 145 m 2.25
1.0392 No.
1.1859 No. 155 m
1.0229 No.
1.2022 No. 165 m 1.50
1.0066 No.
1.2185 No. 175 m `
0.9903 No.
1.2348 No. 185 m
1.2511 No. 195 m
1.2674 No.
ROAD