Anda di halaman 1dari 27

TSX:GCM

Gemcom Software International Inc.


Minex 5.2 – Apollo Scheduling – Ignore Function

Copyright 2007, Gemcom Software International Inc.


2
APOLLO

Apollo course

• Overview
• Design
• Volumes Reporting
• Scheduling
• Plotting

Copyright 2007, Gemcom Software International Inc.


3
APOLLO

Apollo course

SCHEDULING

Copyright 2007, Gemcom Software International Inc.


4
APOLLO
SCHEDULING

SCHEDULING SIMLIFIED BY

• IGNORE SWITHCES

• MOVEMENT FILES

• IGNORE LAYERS

Copyright 2007, Gemcom Software International Inc.


5
APOLLO
IGNORE SWITCHES

Copyright 2007, Gemcom Software International Inc.


6
APOLLO
IGNORE SWITCHES

FIRST UNDERSTAND

3 STAGES OF MINING

Copyright 2007, Gemcom Software International Inc.


7
APOLLO

3 STAGES OF MINING

1 SURFACE
2 PREMINING
3 MINING
Copyright 2007, Gemcom Software International Inc.
8
APOLLO
STAGE 1 SURFACE MINING

• TREE CLEARING
• COAL CLEAN OFF

SURFACE MINING
GENERALLY IGNORED

Copyright 2007, Gemcom Software International Inc.


9
APOLLO
STAGE 2 PREMINING

• DRILLING
• RIPPING

PREMINING
GENERALLY IGNORED

Copyright 2007, Gemcom Software International Inc.


10
APOLLO
STAGE 3 MINING

• DIGGING
• EXCAVATION

MINING must be done

Copyright 2007, Gemcom Software International Inc.


11
APOLLO
IGNORE SURFACE MINING

WE ASSUME
TREE CLEARING & COAL CLEAN UP
ARE AUTOMATIC & ARE NOT SCHEDULED

Copyright 2007, Gemcom Software International Inc.


12
APOLLO
IGNORE PREMINING

WE ASSUME
DRILLING BLASTING &
RIPPING ARE AUTOMATIC
& ARE NOT SCHEDULED

Copyright 2007, Gemcom Software International Inc.


13
APOLLO
STAGE 3 MINING

MINING HAS TWO PARTS


WASTE & COAL

Waste MINING must be done


Coal MINING can be ignored

Copyright 2007, Gemcom Software International Inc.


14
APOLLO
IGNORE COAL MINING

WE ASSUME
COAL IS MINED AUTOMATICALLY
WHEN WASTE IS REMOVED
WARNING MEANS NO INVENTORY

Copyright 2007, Gemcom Software International Inc.


15
APOLLO
IGNORE COAL MINING

WE ASSUME
COAL IS MINED AUTOMATICALLY
WHEN WASTE IS REMOVED
WARNING MEANS NO INVENTORY

Copyright 2007, Gemcom Software International Inc.


APOLLO 16

IGNORE TRUCKS

EQUIPMENT FILE DEFINES


TRUCK REQUIRED
DRAGLINE HAS NO TRUCKS

Copyright 2007, Gemcom Software International Inc.


APOLLO 17

IGNORE TRUCKS

EXCAVATOR OR LOADER HAS


TRUCKS

Copyright 2007, Gemcom Software International Inc.


18
APOLLO
IGNORE TRUCKS

RATE = 100%

WE ASSUME LOADER IS FULLY


TRUCKED AND OPERATES
AT FULL RATE

Copyright 2007, Gemcom Software International Inc.


APOLLO 19

IGNORE WEDGES
WASTE MINING ADVANCES
LOWER WEDGE
PRIME
Lower wedge
UPPER WEDGE Upper wedge
Prime

Copyright 2007, Gemcom Software International Inc.


APOLLO 20

IGNORE WEDGES

UPPER WEDGE REQUIRES DOZER


ASSIST
BUT DOZER SCHEDULEING IS VERY
DETAILED

Copyright 2007, Gemcom Software International Inc.


21
APOLLO
IGNORE WEDGES

WE ASSUME DOZER WORK


IS DONE

Copyright 2007, Gemcom Software International Inc.


APOLLO 22

IGNORE WASTE
THIN WASTE (AIB)
IS MINED
AUTOMATICALLY

AIB

Copyright 2007, Gemcom Software International Inc.


APOLLO 23

AIB
AI AIB
B
IGNORE WASTE

Copyright 2007, Gemcom Software International Inc.


APOLLO 24

EQUIPMENT FILE

DIG RATE
= RATE x CALENDAR x UTILISATION x QUALITY VARIABLE

AI AIB
B

Copyright 2007, Gemcom Software International Inc.


APOLLO 25

SCHEDULE SELECT

Copyright 2007, Gemcom Software International Inc.


APOLLO 26

ADDITIONAL IGNORE FUNCTION

 IGNORE COAL MINING


 Coal is automatically mined when it’s exposed without affected the waste equipment production
х Have to put the coal equipment when coal exposed

 IGNORE PARTIAL EXPOSURE


х We can mine the coal without having it 100% exposed
Notes: x Ignore coal mining to run x Ignore partial exposure

 IGNORE EXPOSURE
х To prevent underground mining
Notes: Generally to make the scheduling run faster just tick off x Ignore Exposure & X Ignore Codes

Copyright 2007, Gemcom Software International Inc.


APOLLO 27

 Set SMG_QUERY_DATABASE_ACCESS Yes


Notes: - Restart Minex
- Open DBR  Shared “YES” (Just read)
- Open DBS  Shared “NO” (To rewrite before scheduling run.
To report “YES” (to make a report after scheduling)

 EQUIPMENT MOVEMENT VARIABLE


Production factor  To make the schedule slower in certain block

 EQUIPMENT CANNOT FIND AN EXPOSED LAYER TO START


Because there’s a small/tiny layers (trivial layer). Always used minimum 5 in Build DBR

 TO BREAK REPORT TO WEEKLY BASIS


 Use date control file in c:/ Minex / etc / calendars / Date Control File
 Copy this file into the directory and edit using text editor

 POST VIEW

 BACK STEP IN SCHEDULING

Copyright 2007, Gemcom Software International Inc.

Anda mungkin juga menyukai