ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL SAT SPESIFIKASI/ JENIS KAYU KE LOKASI KETERANGAN
(Rp) (Rp)
1 Papan Mal / Begesting Kls III (3.5 Cm) Lbr Rita, Kemiri, Kapuk Hutan. 17,000.00
M3 600,000.00
M3 2,600,000.00
M3 3,000,000.00
M3 3,000,000.00
M3 2,600,000.00
M3 3,000,000.00
M3 6,500,000.00
M3 2,600,000.00
M3 6,500,000.00
M3 3,000,000.00
M3 6,500,000.00
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL SAT SPESIFIKASI/ JENIS KAYU KE LOKASI KETERANGAN
(Rp) (Rp)
1 Papan Mal / Begesting Kls III (3.5 Cm) Lbr Rita, Kemiri, Kapuk Hutan. 35,000.00
M3 1,000,000.00
M3 3,500,000.00
M3 3,500,000.00
M3 3,500,000.00
M3 3,500,000.00
M3 3,500,000.00
M3 6,500,000.00
M3 3,500,000.00
M3 6,500,000.00
M3 3,500,000.00
M3 6,500,000.00
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL SAT SPESIFIKASI/ JENIS KAYU KE LOKASI KETERANGAN
(Rp) (Rp)
1 Papan Mal / Begesting Kls III (3.5 Cm) Lbr Rita, Kemiri, Kapuk Hutan. 50,000.00
M3 1,300,000.00
M3 2,400,000.00
M3 2,400,000.00
M3 2,400,000.00
M3 2,500,000.00
M3 2,500,000.00
M3 7,500,000.00
M3 2,500,000.00
M3 7,500,000.00
M3 2,500,000.00
M3 7,500,000.00
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL SAT SPESIFIKASI/ JENIS KAYU KE LOKASI KETERANGAN
(Rp) (Rp)
1 Papan Mal / Begesting Kls III (3.5 Cm) Lbr Rita, Kemiri, Kapuk Hutan. 58,000.00
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL SAT SPESIFIKASI KE LOKASI KETERANGAN
(Rp) (Rp)
1 Batako Bh ukuran 10 x 40 x 20 cm, sisi tajam, keras, tidak pecah
2 Batu Gunung M³ Warna Hitam 20,000.00 Rp. 50.000 / Reit (2,5 M3)
3 Batu Belah 15/20 M³ Batu belah, 3 bidang pecah, keras 20,000.00 Rp. 50.000 / Reit (2,5 M3)
4 Batu Belah 5/7 M³ Batu belah, 3 bidang pecah, keras 30,000.00 Rp. 75.000 / Reit (2,5 M3)
5 Batu Belah 3/5 M³ Batu belah, 3 bidang pecah, keras 250,000.00 Rp. 500.000 / Reit (2,0 M3)
6 Batu Belah 2/3 M³ Batu belah, 3 bidang pecah, keras 250,000.00 Rp. 500.000 / Reit (2,0 M3)
7 Bata Merah Bh ukuran 5 x 10 x 22 cm, sisi tajam, keras, warna merata 600.00
8 Pasir Pasang M³ Pasir kali, tidak mengandung tanah/clay 20,000.00 Rp. 50.000 / Reit (2,5 M3)
9 Pasir Beton M³ Pasir kali, tidak mengandung tanah/clay 20,000.00 Rp. 50.000 / Reit (2,5 M3)
10 Pasir Urug M³ Pasir kali, mengandung tanah/clay 20% 20,000.00 Rp. 50.000 / Reit (2,5 M3)
12 Sirtu M³ Pasir batu, uk. Batuan 3-5 cm, 20,000.00 Rp. 50.000 / Reit (2,5 M3)
tidak mengandung tanah/clay
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL SAT SPESIFIKASI KE LOKASI KETERANGAN
(Rp) (Rp)
1 Batako Bh ukuran 10 x 40 x 20 cm, sisi tajam, keras, tidak pecah
2 Batu Gunung M³ Warna Hitam 20,000.00 Rp. 50.000 / Reit (2,5 M3)
3 Batu Belah 15/20 M³ Batu belah, 3 bidang pecah, keras 20,000.00 Rp. 50.000 / Reit (2,5 M3)
4 Batu Belah 5/7 M³ Batu belah, 3 bidang pecah, keras 30,000.00 Rp. 75.000 / Reit (2,5 M3)
5 Batu Belah 3/5 M³ Batu belah, 3 bidang pecah, keras 250,000.00 Rp. 500.000 / Reit (2,0 M3)
6 Batu Belah 2/3 M³ Batu belah, 3 bidang pecah, keras 250,000.00 Rp. 500.000 / Reit (2,0 M3)
7 Bata Merah Bh ukuran 5 x 10 x 22 cm, sisi tajam, keras, warna merata 600.00
8 Pasir Pasang M³ Pasir kali, tidak mengandung tanah/clay 20,000.00 Rp. 50.000 / Reit (2,5 M3)
9 Pasir Beton M³ Pasir kali, tidak mengandung tanah/clay 20,000.00 Rp. 50.000 / Reit (2,5 M3)
10 Pasir Urug M³ Pasir kali, mengandung tanah/clay 20% 20,000.00 Rp. 50.000 / Reit (2,5 M3)
11 Tanah Urug M³ Tidak tercampur sisa tumbuhan, plastik, 20,000.00 Rp. 50.000 / Reit (2,5 M3)
12 Sirtu M³ Pasir batu, uk. Batuan 3-5 cm, 20,000.00 Rp. 50.000 / Reit (2,5 M3)
tidak mengandung tanah/clay
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL SAT SPESIFIKASI KE LOKASI KETERANGAN
(Rp) (Rp)
1 Batako Bh ukuran 10 x 40 x 20 cm, sisi tajam, keras, tidak pecah
2 Batu Gunung M³ Warna Hitam 20,000.00 Rp. 50.000 / Reit (2,5 M3)
3 Batu Belah 15/20 M³ Batu belah, 3 bidang pecah, keras 20,000.00 Rp. 50.000 / Reit (2,5 M3)
4 Batu Belah 5/7 M³ Batu belah, 3 bidang pecah, keras 30,000.00 Rp. 75.000 / Reit (2,5 M3)
5 Batu Belah 3/5 M³ Batu belah, 3 bidang pecah, keras 250,000.00 Rp. 500.000 / Reit (2,0 M3)
6 Batu Belah 2/3 M³ Batu belah, 3 bidang pecah, keras 250,000.00 Rp. 500.000 / Reit (2,0 M3)
7 Bata Merah Bh ukuran 5 x 10 x 22 cm, sisi tajam, keras, warna merata 600.00
8 Pasir Pasang M³ Pasir kali, tidak mengandung tanah/clay 20,000.00 Rp. 50.000 / Reit (2,5 M3)
9 Pasir Beton M³ Pasir kali, tidak mengandung tanah/clay 20,000.00 Rp. 50.000 / Reit (2,5 M3)
10 Pasir Urug M³ Pasir kali, mengandung tanah/clay 20% 20,000.00 Rp. 50.000 / Reit (2,5 M3)
11 Tanah Urug M³ Tidak tercampur sisa tumbuhan, plastik, 20,000.00 Rp. 50.000 / Reit (2,5 M3)
12 Sirtu M³ Pasir batu, uk. Batuan 3-5 cm, 20,000.00 Rp. 50.000 / Reit (2,5 M3)
tidak mengandung tanah/clay
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL SAT SPESIFIKASI KE LOKASI KETERANGAN
(Rp) (Rp)
1 Batako Bh ukuran 10 x 40 x 20 cm, sisi tajam, keras, tidak pecah
2 Batu Gunung M³ Warna Hitam 20,000.00 Rp. 50.000 / Reit (2,5 M3)
3 Batu Belah 15/20 M³ Batu belah, 3 bidang pecah, keras 20,000.00 Rp. 50.000 / Reit (2,5 M3)
4 Batu Belah 5/7 M³ Batu belah, 3 bidang pecah, keras 20,000.00 Rp. 50.000 / Reit (2,5 M3)
5 Batu Belah 3/5 M³ Batu belah, 3 bidang pecah, keras 250,000.00 Rp. 750.000 / Reit (3,0 M3)
6 Batu Belah 2/3 M³ Batu belah, 3 bidang pecah, keras 250,000.00 Rp. 750.000 / Reit (3,0 M3)
8 Pasir Pasang M³ Pasir kali, tidak mengandung tanah/clay 20,000.00 Rp. 50.000 / Reit (2,5 M3)
9 Pasir Beton M³ Pasir kali, tidak mengandung tanah/clay 20,000.00 Rp. 50.000 / Reit (2,5 M3)
10 Pasir Urug M³ Pasir kali, mengandung tanah/clay 20% 20,000.00 Rp. 50.000 / Reit (2,5 M3)
12 Sirtu M³ Pasir batu, uk. Batuan 3-5 cm, 20,000.00 Rp. 50.000 / Reit (2,5 M3)
tidak mengandung tanah/clay
. Daun Pintu Panil Papan bh ukr. 0,82 x 2,0 m s/d 2.10 m 1,300,000.00
bahan kayu kls I, disain standar sesuai gambar
8 Daun Pintu Panil Papan ukr. 0,92 x 2,0 m s/d 2.10 m 1,500,000.00
bahan kayu kls I, disain standar sesuai gambar
. Daun Pintu Double Teakwood bh ukr 0,82 x 2,0 m s/d 2.10 m
bahan kayu kls I Bayam , disain standar sesuai gambar 650,000.00
11 Daun Pintu Trali Papan bh * Ukr. 0.92 x 1.20 m Rangka papan Kls I (Daun pintu Irisan Papan) 650,000.00
* Ukr. 0.92 x 1.20 m Rangka papan Jati (Daun pintu Irisan Papan) 650,000.00
. Kusen Pintu type I standar bh Ukr. Bersih dalam, tinggi lubang pintu 2,00 m, lebar 0,90 m 600,000.00 Harga dihitung per lubang
Ukr Kayu Kosen 5/13 cm Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,92 m
Kayu Kls I, Jenis Bayam
. Kusen Pintu type II standar bh Ukr. Bersih dalam, tinggi lubang pintu 2,00 m, lebar 0,80 m 600,000.00
Ukr Kayu Kosen 5/13 cm Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,80 m Harga dihitung per lubang
Kayu Kls I, Jenis Bayam
. Kusen Pintu type III standar bh Ukr. Bersih dalam, tinggi lubang pintu 2,00 m, lebar 0,70 m 550,000.00 Harga dihitung per lubang
Ukr Kayu Kosen 5/13 cm Tanpa lubang Ventilasi
Kayu Kls I, Jenis Bayam
. Kusen Pintu Stek bh Ukr. Tinggi 1.00 m 500,000.00 Harga dihitung per lubang
Ukr Kayu Kosen 5/13 cm Kayu Kls I, Jenis Bayam
. Kusen Jendela Type I standar bh Ukr. Bersih dalam, tinggi lubang pintu 1.25 m, lebar 0,60 m 350,000.00
Ukr Kayu Kosen 5/13 cm Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,60 m Harga dihitung per lubang
Kayu Kls I, Jenis Bayam
. Kusen Jendela Type I standar bh Ukr. Bersih dalam, tinggi lubang pintu 1.50 m, lebar 0,60 m 350,000.00
Ukr Kayu Kosen 5/13 cm Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,60 m Harga dihitung per lubang
Kayu Kls I, Jenis Bayam
. Kusen BV bh Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,60 m 300,000.00 Harga dihitung per lubang
Ukr Kayu Kosen 5/13 cm Kayu Kls I, Jenis Bayam
. Daun Pintu WC/KM bh Ukr. Pintu Tinggi 2.00 m. Lebar 0.70 m 700,000.00 Harga dihitung per lubang
Daun pintu PVC ( Warna Kayu, Warna Hijau, Biru )
Keterangan : Harga yang dimaksud adalah harga toko / bengkel diluar ongkos angkut
11 Daun Pintu Trali Papan bh * Ukr. 0.92 x 1.20 m Rangka papan Kls I (Daun pintu Irisan Papan) 1,400,000.00
* Ukr. 0.92 x 1.20 m Rangka papan Jati (Daun pintu Irisan Papan) 1,350,000.00
. Kusen Pintu type I standar bh Ukr. Bersih dalam, tinggi lubang pintu 2,00 m, lebar 0,90 m Harga dihitung per lubang
Ukr Kayu Kosen 5/13 cm Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,92 m 950,000.00
Kayu Kls I, Jenis Bayam
. Kusen Pintu type II standar bh Ukr. Bersih dalam, tinggi lubang pintu 2,00 m, lebar 0,80 m 800,000.00
Ukr Kayu Kosen 5/13 cm Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,80 m Harga dihitung per lubang
Kayu Kls I, Jenis Bayam
. Kusen Pintu type III standar bh Ukr. Bersih dalam, tinggi lubang pintu 2,00 m, lebar 0,70 m 750,000.00 Harga dihitung per lubang
Ukr Kayu Kosen 5/13 cm Tanpa lubang Ventilasi
Kayu Kls I, Jenis Bayam
. Kusen Pintu Stek bh Ukr. Tinggi 1.00 m 350,000.00 Harga dihitung per lubang
Ukr Kayu Kosen 5/13 cm Kayu Kls I, Jenis Bayam
. Kusen Jendela Type I standar bh Ukr. Bersih dalam, tinggi lubang pintu 1.25 m, lebar 0,60 m 450,000.00
Ukr Kayu Kosen 5/13 cm Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,60 m Harga dihitung per lubang
Kayu Kls I, Jenis Bayam
. Kusen Jendela Type I standar bh Ukr. Bersih dalam, tinggi lubang pintu 1.50 m, lebar 0,60 m 450,000.00
Ukr Kayu Kosen 5/13 cm Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,60 m Harga dihitung per lubang
Kayu Kls I, Jenis Bayam
. Kusen BV bh Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,60 m 150,000.00 Harga dihitung per lubang
Ukr Kayu Kosen 5/13 cm Kayu Kls I, Jenis Bayam
. Daun Pintu WC/KM bh Ukr. Pintu Tinggi 2.00 m. Lebar 0.70 m 700,000.00 Harga dihitung per lubang
Daun pintu PVC ( Warna Kayu, Warna Hijau, Biru )
Keterangan : Harga yang dimaksud adalah harga toko / bengkel diluar ongkos angkut
11 Daun Pintu Trali Papan bh * Ukr. 0.92 x 1.20 m Rangka papan Kls I (Daun pintu Irisan Papan) 1,000,000.00
* Ukr. 0.92 x 1.20 m Rangka papan Jati (Daun pintu Irisan Papan) 1,000,000.00
. Kusen Pintu type I standar bh Ukr. Bersih dalam, tinggi lubang pintu 2,00 m, lebar 0,90 m Harga dihitung per lubang
Ukr Kayu Kosen 5/13 cm Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,92 m 750,000.00
Kayu Kls I, Jenis Bayam
. Kusen Pintu type II standar bh Ukr. Bersih dalam, tinggi lubang pintu 2,00 m, lebar 0,80 m
Ukr Kayu Kosen 5/13 cm Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,80 m 750,000.00 Harga dihitung per lubang
Kayu Kls I, Jenis Bayam
. Kusen Pintu type III standar bh Ukr. Bersih dalam, tinggi lubang pintu 2,00 m, lebar 0,70 m 650,000.00 Harga dihitung per lubang
Ukr Kayu Kosen 5/13 cm Tanpa lubang Ventilasi
Kayu Kls I, Jenis Bayam
. Kusen Pintu Stek bh Ukr. Tinggi 1.00 m 500,000.00 Harga dihitung per lubang
Ukr Kayu Kosen 5/13 cm Kayu Kls I, Jenis Bayam
. Kusen Jendela Type I standar bh Ukr. Bersih dalam, tinggi lubang pintu 1.25 m, lebar 0,60 m
Ukr Kayu Kosen 5/13 cm Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,60 m 500,000.00 Harga dihitung per lubang
Kayu Kls I, Jenis Bayam
. Kusen Jendela Type I standar bh Ukr. Bersih dalam, tinggi lubang pintu 1.50 m, lebar 0,60 m
Ukr Kayu Kosen 5/13 cm Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,60 m 550,000.00 Harga dihitung per lubang
Kayu Kls I, Jenis Bayam
. Kusen BV bh Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,60 m 200,000.00 Harga dihitung per lubang
Ukr Kayu Kosen 5/13 cm Kayu Kls I, Jenis Bayam
. Daun Pintu WC/KM bh Ukr. Pintu Tinggi 2.00 m. Lebar 0.70 m 450,000.00 Harga dihitung per lubang
Daun pintu PVC ( Warna Kayu, Warna Hijau, Biru )
Keterangan : Harga yang dimaksud adalah harga toko / bengkel diluar ongkos angkut
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
2. PERALATAN
. Cangkul bh 40,000.00
206 Linggis bh Sedang (Tidak Berulir) 40,000.00
207 Pick Weel bh 55,000.00
208 Sekop bh Jo Kondao
209 Sekop bh Cap Mata 52,500.00
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
210 Ember Kecil Biasa (Cor) Rol Anti Pecah
211 Ember Kecil Elastis (Cor) bh Anti Pecah
212 Ember (Campuran) bh Anti Pecah
213 Ember (Campuran) bh Anti Pecah
214 Ember Bak (Untuk Matex) m
215 Sendok Semen Bh
216 Setrika Kayu bh
217 Lat /mistar Alluminium bh
218 Benang Nilon bh Plastik
219 Meteran 5 M bh
220 Hamer Kecil bh
221 Hamer Sedang bh
222 Selang waterpas bh
223 Selang Air set Sandflex
224 Terpal bh 3x4m
225 Terpal bh 4x6m
226 Drom Air bh
227 Tanki Air bh 3300 Liter
228 Tanki Air bh 5000 Liter
229 Gergaji Kayu bh
230 Gagang Gergaji Besi bh
231 Mata Gergaji Waja bh
232 Mata Gergaji Biasa bh
233 Kakatua bh
234 Tang Besar bh
235 Tang Sedang bh
236 Obeng Bunga sedang bh
237 Obeng Plat sedang bh
238 Alat Pemotong Keramik bh
239 Kawat Ayakan halus M'
240 Kawat Ayakan kasar M'
241 Kunci Pipa 1/2'' - 2'' No 26 bh
242 Kunci Pipa 1/2'' - 2'' No 36 bh
243 Kunci Pipa 3'' bh
244 Pisau Dumpul kecil bh
245 Pisau Dumpul besar bh
246 Pisau Plamir kecil bh
247 Pisau Plamir besar bh
(..........................................) (...............................)
SURVEY HARGA SATUAN
PROPINSI : NTT TOKO/CV/UD/Perorangan : UD PUTRA FLORES
KABUPATEN : FLORES TIMUR ALAMAT : Jln. Niaga No. 1 (Tlp. 21235) - Larantuka
STATUS : Mei 2011
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
I. BAHAN
1 Besi Beton Ф 5 mm Btg SNI / Standart pjg = 10,30 m
2 Besi Beton Ф 6 mm Btg SNI / Standart pjg = 12 m
3 Besi Beton Ф 6 mm Btg pjg = 10.30 m Banci 16,000.00
4 Besi Beton Ф 8 mm Btg SNI / Standart pjg = 12 m
5 Besi Beton Ф 8 mm Btg pjg = 10.30 m 25,000.00
6 Besi Beton Ф 10 mm Btg SNI / Standart pjg = 12 m
7 Besi Beton Ф 10 mm Btg pjg = 10.30 m Banci 36,500.00
8 Besi Beton Ф 12 mm Btg SNI / Standart pjg = 12 m
9 Besi Beton Ф 10,2 mm Btg pjg = 10.30 m Banci 47,500.00
10 Besi Siku Btg 40. 40. 4 85,000.00
11 Besi Siku Btg 50. 50. 5 95,000.00
12 Kawat Ikat Kg 20,000.00
13 Beugel U Bulat ø 16 mm - 52.cm Bh 30,000.00
14 Beugel U Plat - 60 cm Bh 30,000.00
15 Plat Strip ≠ 5 mm - 40 cm Bh 30,000.00
16 Baut Bulat Angkur ø 12 mm - 10 cm kg 3,500.00 18000/Kg
17 Baut Bulat Angkur ø 12 mm - 15 cm kg 4,000.00 18000/Kg
18 Baut Bulat Angkur ø 12 mm - 25 cm kg 5,500.00 18000/Kg
19 Baut Bulat ø 12 mm - 30 cm kg 9,000.00 18000/Kg
20 Ring/Cincin Baut kg 20,000.00 18000/Kg
21 Paku 2-3 cm kg 20,000.00
22 Paku 5 cm kg 13,000.00
23 Paku 7 cm kg 13,000.00
24 Paku 10 cm kg 13,000.00
25 Paku 12 cm kg 13,000.00
26 Paku Beton 7 cm kg 18,000.00
27 Paku Beton 10 cm kg 18,000.00
28 Paku Beton 12 cm kg 18,000.00
29 Paku Seng Kg 18,000.00
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
30 Seng Gelombang BJLS 0,20 mm Lbr Fumira BJLS 0.20 / 180 x 80 Cm
31 Seng Gelombang BJLS 0,30 mm Lbr Fumira BJLS 0.30 / 180 x 80 Cm
32 Seng Gelombang BJLS 0,20 mm Lbr Lokfom BJLS 0.20 / 180 x 80 Cm Gaja Gading/Gaja King 35,000.00
33 Seng Gelombang BJLS 0,30 mm Lbr Lokfom BJLS 0.30 / 180 x 80 Cm Gaja Gading/Gaja King 53,000.00
34 Seng Gelombang BJLA 0,25 mm Lbr BJLA 0.25 / 180 x 80 Cm Baja Lapis Aluminium
35 Seng plat 30 cm m' Lokfom BJLS 0.20 ( Lebar 30 cm ) 10,000.00
36 Seng plat 30 cm m' Lokfom BJLS 0.30 ( Lebar 30 cm )
37 Seng plat 40 cm m' Lokfom BJLS 0.20 ( Lebar 40 cm ) 14,000.00
38 Seng plat 40 cm m' Lokfom BJLS 0.30 ( Lebar 40 cm )
39 Seng Plat 60 cm m' BJLS 0.20 ( Lebar 60 cm ) 21,000.00
40 Seng Plat 60 cm m' BJLS 0.30 ( Lebar 60 cm )
41 Seng Plat 80 cm m' BJLS 0.20 ( Lebar 80 cm ) 28,500.00
42 Seng Plat 80 cm m' BJLS 0.30 ( Lebar 80 cm )
43 Seng Plat 100 cm m' BJLS 0.30 ( Lebar 100 cm )
44 Keramik 40 x 40 cm Putih Polos dos Asia Tile 40 cm x 40 cm KW 1 47,500.00
45 Keramik 40 x 40 cm Bermotif dos Kobin 40 cm x 40 cm
46 Keramik 30 x 30 cm Putih Polos dos Asia Tile 30 cm x 30 cm KW 1 42,500.00
47 Keramik 30 x 30 cm Bermotif dos Asia Tile 30 cm x 30 cm KW 1
48 Keramik 30 x 30 cm Bermotif dos AIKAD 30 cm x 30 cm KW 1
49 Keramik 20 x 20 cm Putih Polos Dos Asia Tile 20 cm x 20 cm 50,000.00
50 Keramik 20 x 20 cm Bermotif Dos Asia Tile 20 cm x 20 cm 50,000.00
51 Keramik 20 x 25 cm Bermotif Dos Kobin 20 cm x 25 cm 55,000.00
52 Keramik 20 x 25 cm Bermotif Dos Asia 20 cm x 25 cm
53 Keramik 20 x 25 cm Bermotif Dos Masterina 20 cm x 25 cm
54 Keramik 20 x 25 cm Bermotif Dos IKAD 20 cm x 25 cm
55 Keramik 20 x 25 cm Bertekstur (Wc/Km) Dos IKAD 20 cm x 25 cm
56 Keramik 20 x 25 cm Bertekstur (Wc/Km) Dos Asia 20 cm x 25 cm
57 Plint Keramik 10 x 20 cm Bh
58 Tegel Wafel 20 x 25 cm Dos
59 Semen Gersik Zak ukr 50 kg/ sak PPC (Semen Portland Pozolan)
60 Semen Gersik Zak ukr 40 kg/ sak PPC (Semen Portland Pozolan)
61 Semen Tonasa Zak ukr 50 kg/ sak
62 Semen Tonasa Zak ukr 40 kg/ sak
63 Semen Bosowa Zak ukr 50 kg/ sak 53,000.00
64 Semen Bosowa Zak ukr 40 kg/ sak 46,000.00
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
65 Semen Tiga Roda Zak ukr 40 kg/ sak
66 Semen Putih Zak
67 Semen Putih kg
68 Semen Warna ……… kg
69 Kaca Bening 3 mm M2 95,000.00
70 Kaca Riben/Gelap 3 mm M2 100,000.00
71 Kaca Bening 5 mm M2 100,000.00
72 Kaca Riben/Gelap 5 mm M2 110,000.00
73 Tripleks 9 mm Lbr Meranti 120,000.00 Sengon
74 Tripleks 6 mm Lbr Meranti 77,500.00 Sengon
75 Tripleks 4 mm Lbr Meranti 56,000.00 Semi Meranti
76 Tripleks 3 mm Lbr Meranti 44,000.00 Semi Meranti
77 Teacwood 3 mm Lbr 80,000.00
78 Teacwood 4 mm Lbr
79 Kursi Plastik Bh Napolyon Sandaran Tanpa Lengan
80 Lem Aica-Aibon kg Aries 47,500.00
81 Plamir Tembok kg Arco
82 Plamir Tembok kg Boyo 5 kg
83 Plamir Tembok kg Mexico 5 kg
84 Plamir Tembok kg Master/Weber 7,000.00 35,000.00
85 Dumpul Kayu kg Pedang 4,400.00 22,000.00
86 Dumpul Kayu kg Cawan -
87 Politur kg Mowilex 47,500.00
88 Vernis kg
89 Meni Kayu ltr Pedang 22,000.00
90 Meni Besi ltr Pedang 22,000.00
91 Cat Besi / Seng kg Arco
92 Cat Seng kg Matex 16,875.00 67.500 per klg (4 Kg)
93 Cat Seng kg Takaraaf
94 Cat Seng kg Belmas
95 Cat Seng kg Jarum
96 Cat Tembok kg Komilex
97 Cat Tembok kg Matex 13,000.00 65.000 per klg (5 Kg)
98 Cat Tembok kg Mawar
99 Cat Tembok kg Aries
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
100 Cat Tembok kg Arco
101 Cat Kayu kg Varaco
102 Cat Kayu kg Mawar
103 Cat Kayu kg Matex
104 Cat Kayu kg Dextro Lux
105 Cat Kayu kg Avian 38,500.00
106 Cat Kayu kg Emco 53,500.00
107 Minyak Cat/Tinner Ltr Biasa 25,000.00
108 Minyak Cat/Tinner Ltr Spesial (A) 31,000.00
109 Amplas Kayu Lbr Kertas Fuji Kasar No. 2" 3,500.00
110 Amplas Kayu Lbr Kertas Fuji Halus No. 5" 3,500.00
111 Amplas Kayu Lbr Kain Flejug Fox Kasar No. 2" 3,500.00
112 Amplas Kayu Lbr Kain Flejug Fox Halus No. 5" 3,500.00
113 Amplas Besi bh
114 Kwas Biasa 4'' bh Medico 10 cm 8,000.00
115 Kwas Biasa 3'' bh Medico 7 cm 5,000.00
116 Kwas Biasa 2'' bh Medico 5 cm 3,500.00
117 Kwas Biasa 1'' bh Medico 2.5 cm 2,500.00
118 Kwas Biasa 3/4'' bh Medico 2 cm 3,000.00
119 Kwas Biasa 1/2'' bh Medico 1.5 cm 2,000.00
120 Kwas Roll bh Imundex 12,000.00
121 Bak / tempat Cat Tembok bh 10,000.00
122 Ember Air bh Anti Pecah 10,000.00
123 Kunci tanam 2 x Putar bh Yuri Loch Factori Panjang 125,000.00
124 Kunci tanam 2 x Putar bh Fereder 175,000.00 Paori
125 Kunci tanam 2 x Putar bh Kuda
126 Kunci tanam 2 x Putar bh Royal
127 Kunci tanam 2 x Putar bh TOP
128 Kunci tanam 2 x Putar bh Yalle
129 Grendel Pintu bh Medico 12,500.00
130 Grendel Pintu bh MDC 2"
131 Grendel Jendela bh Kupu-kupu
132 Grendel Jendela bh RRC
133 Grendel Jendela bh Medico 7,500.00
134 Engsel Pintu bh Hona 4 cm x 3 cm x 3 mm Kuning 20,000.00 Gameo
135 Engsel Pintu bh Cobra 4 cm x 3 cm x 3 mm Stenlys Stile 10,000.00 HPP
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
136 Engsel Jendela bh Hona 3 cm x 2.5 cm x 2.5 mm Kuning 15,000.00 Gameo
137 Engsel Jendela bh Cobra Stenlys Stile 7,500.00 HPP
138 Kait Angin bh Sakura Lipat Kuning 7,500.00
139 Kait Angin bh RRC
140 Kait Angin bh Lipat Kuning
141 Sekring Box bh Broco 1 Lub
142 Sekring Box bh Broco 2 Lub
143 Lampu Phillips 5 watt bh Philips
144 Lampu Phillips 8 watt bh Philips
145 Lampu Phillips 14 watt bh Philips
146 Lampu Phillips 18 watt bh Philips 40,000.00
147 Lampu Phillips 23 watt bh Philips
148 Fiting Lampu bh Broco Tempel Warna Putih
149 Fiting Lampu bh Broco Tempel Warna Hitam
150 Fiting Lampu bh Broco Gantung
151 Saklar Ganda bh Broco Saklar Tanam Seri 20,000.00
152 Saklar Tunggal bh Broco Saklar Tanam Engkel 17,500.00
153 Stop Kontak Lengkap bh Broco 17,500.00
154 Embol Dos bh 4,000.00
155 Kabel Listrik NYM 2 x 1,5 mm Rol Eterna 850,000.00
156 Kabel Listrik NYM 2 x 1,5 mm Rol Blitz
157 Kabel Listrik NYM 2 x 2,5 mm Rol Eterna 950,000.00
158 Kabel Listrik NYM 2 x 2,5 mm Rol Blitz
159 Kabel Listrik NYM 2 x 3.0 mm Rol Eterna
160 Kabel Listrik NYM 2 x 3.0 mm Rol Blitz
161 Klem kabel 10 mm Btg 15,000.00
162 Isolasi Listrik Bh Unible 10,000.00
163 Sekerup 2.5 cm Doz 6,000.00
164 Pipa PVC Ф 5/8" (Pembks Kabel) Bh 10,000.00
165 Pipa PVC 4'' Btg AW Putih 95,000.00 Jenis ABU" AW
166 Pipa PVC 4'' Btg Maspion Abu-abu / Tebal
167 Pipa PVC 3'' Btg AW Putih 75,000.00 Jenis ABU" AW
168 Pipa PVC 3'' Btg Maspion Abu-abu / Tebal
169 Pipa PVC 2 1/2'' Btg AW Putih
170 Pipa PVC 2 1/2'' Btg Maspion Abu-abu / Tebal
171 Pipa PVC 2 '' Btg AW Putih 55,000.00 Jenis ABU" AW
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
172 Pipa PVC 2 '' Btg Maspion Abu-abu / Tebal
173 Pipa PVC 1 1/2'' Btg AW Putih 47,500.00 Jenis ABU" AW
174 Pipa PVC 1 1/2'' Btg Maspion Abu-abu / Tebal
175 Pipa PVC 1 '' Btg AW Putih 40,000.00 Jenis ABU" AW
176 Pipa PVC 1 '' Btg Maspion Abu-abu / Tebal
177 Socket PVC 4'' bh 12,500.00
178 Elbow PVC 4'' bh 15,000.00
179 Elbow PVC 1 1/2'' bh 4,500.00
180 Socket PVC 1 1/2'' bh 4,000.00
181 Tee PVC 1 1/2'' bh 5,000.00
182 Knee / Elbow PVC 1 1/2'' bh 4,500.00
183 Lem Paralon bh 7,500.00
184 Kran air 1/2'' dorong bh 30,000.00 Merek PVC/KN
185 Floor drain ( Plastik ) bh Plastik 25,000.00
186 Wastafel / Kizincing bh INA 375,000.00 Sedang komplit
187 Kloset Jongkok bh INA 150,000.00
188 Kloset Jongkok bh KIA
189 Kloset Duduk bh INA 450,000.00
190 Knee / Elbow GIP dia 1/2" bh 6,000.00
191 Watermur GIP dia 1/2" bh 15,000.00
192 Watermur GIP dia 1" bh 20,000.00
193 Tee GIP dia 1" bh 9,500.00
194 Oversock GIP dia 1"-1/2" bh 12,500.00
195 Oversock GIP dia 1"-1/2" bh 12,500.00
196 Pipa GIP dia 1'' btg
197 Pipa GIP dia 1/2'' btg 95,000.00
198 Socket GIP dia 1/2'' bh 5,000.00
199 Socket GIP dia 1'' bh 7,000.00
200 Tee GIP dia 1/2'' bh 7,500.00
201 Selotip bh 4,000.00
202 Lem Silicon bh 15,000.00
203 Pipa Hawa dia 1 1/2" bh 50 cm 15,000.00
204 Pipa Hawa dia 1 1/2" bh 75 cm 20,000.00
II ALAT
. Cangkul bh
206 Linggis bh Sedang (Tidak Berulir) 55,000.00
207 Pick Weel bh 55,000.00
208 Sekop bh Jo Kondao 65,000.00 merek Amico
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
209 Sekop bh Cap Mata 50,000.00
210 Ember Kecil Biasa (Cor) Rol Anti Pecah 10,000.00
211 Ember Kecil Elastis (Cor) bh Anti Pecah 10,000.00
212 Ember (Campuran) bh Anti Pecah
213 Ember (Campuran) bh Anti Pecah
214 Ember Bak (Untuk Matex) m 10,000.00
215 Sendok Semen Bh 17,500.00
216 Setrika Kayu bh 15,000.00
217 Lat /mistar Alluminium bh
218 Benang Nilon bh Plastik 25,000.00
219 Meteran 5 M bh 17,500.00
220 Hamer Kecil bh 27,500.00
221 Hamer Sedang bh 35,000.00
222 Selang waterpas bh 2,000.00 Per meter
223 Selang Air set Sandflex
224 Terpal bh 3x4m 60,000.00
225 Terpal bh 4x6m 120,000.00
226 Drom Air bh 165,000.00 200 ltr
227 Tanki Air bh 3300 Liter 4,900,000.00
228 Tanki Air bh 5000 Liter 7,400,000.00 5200 ltr
229 Gergaji Kayu bh 40,000.00
230 Gagang Gergaji Besi bh 20,000.00
231 Mata Gergaji Waja bh 15,000.00
232 Mata Gergaji Biasa bh
233 Kakatua bh 17,500.00
234 Tang Besar bh 27,500.00
235 Tang Sedang bh
236 Obeng Bunga sedang bh 25,000.00
237 Obeng Plat sedang bh 6,000.00
238 Alat Pemotong Keramik bh 300,000.00
239 Kawat Ayakan halus M'
240 Kawat Ayakan kasar M' 20,000.00
241 Kunci Pipa 1/2'' - 2'' No 26 bh 20,000.00
242 Kunci Pipa 1/2'' - 2'' No 36 bh 95,000.00
243 Kunci Pipa 3'' bh
244 Pisau Dumpul kecil bh 3,000.00
245 Pisau Dumpul besar bh 5,000.00
246 Pisau Plamir kecil bh 3,000.00
247 Pisau Plamir besar bh 6,000.00
( .................................................. ) (.................................................)
SURVEY HARGA SATUAN
PROPINSI : NTT TOKO/CV/UD/Perorangan : Toko Gonzalu
KABUPATEN : FLORES TIMUR ALAMAT : Jln. Negara - Boru Wulanggitang
STATUS : Mei 2011
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
I. BAHAN
1 Besi Beton Ф 5 mm Btg SNI / Standart pjg = 10,30 m
2 Besi Beton Ф 6 mm Btg SNI / Standart pjg = 12 m 25,000.00
3 Besi Beton Ф 6 mm Btg pjg = 10.30 m Banci 17,500.00
4 Besi Beton Ф 8 mm Btg SNI / Standart pjg = 12 m 42,500.00
5 Besi Beton Ф 8 mm Btg pjg = 10.30 m 28,500.00
6 Besi Beton Ф 10 mm Btg SNI / Standart pjg = 12 m 62,500.00
7 Besi Beton Ф 10 mm Btg pjg = 10.30 m Banci 37,500.00
8 Besi Beton Ф 12 mm Btg SNI / Standart pjg = 12 m 90,000.00
9 Besi Beton Ф 10,2 mm Btg pjg = 10.30 m Banci 57,500.00
10 Besi Siku Btg 40. 40. 4 145,000.00
11 Besi Siku Btg 50. 50. 5 200,000.00
12 Kawat Ikat Kg 22,500.00
13 Beugel U Bulat ø 16 mm - 52.cm Bh 22,500.00
14 Beugel U Plat - 60 cm Bh 22,500.00
15 Plat Strip ≠ 5 mm - 40 cm Bh 12,500.00
16 Baut Bulat Angkur ø 12 mm - 10 cm kg 4,000.00
17 Baut Bulat Angkur ø 12 mm - 15 cm kg 4,500.00
18 Baut Bulat Angkur ø 12 mm - 25 cm kg 6,000.00
19 Baut Bulat ø 12 mm - 30 cm kg 7,500.00
20 Ring/Cincin Baut kg 4,000.00
21 Paku 2-3 cm kg 25,000.00
22 Paku 5 cm kg 15,000.00
23 Paku 7 cm kg 15,000.00
24 Paku 10 cm kg 15,000.00
25 Paku 12 cm kg 15,000.00
26 Paku Beton 7 cm kg 20,000.00
27 Paku Beton 10 cm kg 20,000.00
28 Paku Beton 12 cm kg 20,000.00
29 Paku Seng Kg 22,500.00
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
30 Seng Gelombang BJLS 0,20 mm Lbr Fumira BJLS 0.20 / 180 x 80 Cm 35,000.00
31 Seng Gelombang BJLS 0,30 mm Lbr Fumira BJLS 0.30 / 180 x 80 Cm 60,000.00
32 Seng Gelombang BJLS 0,20 mm Lbr Lokfom BJLS 0.20 / 180 x 80 Cm Gaja Gading/Gaja King
33 Seng Gelombang BJLS 0,30 mm Lbr Lokfom BJLS 0.30 / 180 x 80 Cm Gaja Gading/Gaja King
34 Seng Gelombang BJLA 0,25 mm Lbr BJLA 0.25 / 180 x 80 Cm Baja Lapis Aluminium
35 Seng plat 30 cm m' Lokfom BJLS 0.20 ( Lebar 30 cm ) 10,000.00
36 Seng plat 30 cm m' Lokfom BJLS 0.30 ( Lebar 30 cm )
37 Seng plat 40 cm m' Lokfom BJLS 0.20 ( Lebar 40 cm ) 12,000.00
38 Seng plat 40 cm m' Lokfom BJLS 0.30 ( Lebar 40 cm )
39 Seng Plat 60 cm m' BJLS 0.20 ( Lebar 60 cm ) 20,000.00
40 Seng Plat 60 cm m' BJLS 0.30 ( Lebar 60 cm )
41 Seng Plat 80 cm m' BJLS 0.20 ( Lebar 80 cm ) 25,000.00
42 Seng Plat 80 cm m' BJLS 0.30 ( Lebar 80 cm )
43 Seng Plat 100 cm m' BJLS 0.30 ( Lebar 100 cm )
44 Keramik 40 x 40 cm Putih Polos dos Asia Tile 40 cm x 40 cm KW 1 47,500.00
45 Keramik 40 x 40 cm Bermotif dos Kobin 40 cm x 40 cm 55,000.00
46 Keramik 30 x 30 cm Putih Polos dos Asia Tile 30 cm x 30 cm KW 1 38,000.00
47 Keramik 30 x 30 cm Bermotif dos Asia Tile 30 cm x 30 cm KW 1 42,000.00
48 Keramik 30 x 30 cm Bermotif dos AIKAD 30 cm x 30 cm KW 1 45,000.00
49 Keramik 20 x 20 cm Putih Polos Dos Asia Tile 20 cm x 20 cm 45,000.00
50 Keramik 20 x 20 cm Bermotif Dos Asia Tile 20 cm x 20 cm 50,000.00
51 Keramik 20 x 25 cm Bermotif Dos Kobin 20 cm x 25 cm 50,000.00
52 Keramik 20 x 25 cm Bermotif Dos Asia 20 cm x 25 cm 47,500.00
53 Keramik 20 x 25 cm Bermotif Dos Masterina 20 cm x 25 cm
54 Keramik 20 x 25 cm Bermotif Dos IKAD 20 cm x 25 cm 55,000.00
55 Keramik 20 x 25 cm Bertekstur (Wc/Km) Dos IKAD 20 cm x 25 cm 55,000.00
56 Keramik 20 x 25 cm Bertekstur (Wc/Km) Dos Asia 20 cm x 25 cm 47,500.00
57 Plint Keramik 10 x 20 cm Bh 7,000.00
58 Tegel Wafel 20 x 25 cm Dos
59 Semen Gersik Zak ukr 50 kg/ sak PPC (Semen Portland Pozolan)
60 Semen Gersik Zak ukr 40 kg/ sak PPC (Semen Portland Pozolan)
61 Semen Tonasa Zak ukr 50 kg/ sak
62 Semen Tonasa Zak ukr 40 kg/ sak
63 Semen Bosowa Zak ukr 50 kg/ sak 60,000.00 Buruh Bongkar @ Rp.1000/zak
64 Semen Bosowa Zak ukr 40 kg/ sak 50,000.00 Buruh Bongkar @ Rp.1000/zak
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
65 Semen Tiga Roda Zak ukr 40 kg/ sak 50,000.00 Buruh Bongkar @ Rp.1000/zak
66 Semen Putih Zak 100,000.00 Buruh Bongkar @ Rp.1000/zak
67 Semen Putih kg 5,000.00
68 Semen Warna ……… kg 12,000.00
69 Kaca Bening 3 mm M2 100,000.00
70 Kaca Riben/Gelap 3 mm M2 125,000.00
71 Kaca Bening 5 mm M2 140,000.00
72 Kaca Riben/Gelap 5 mm M2 145,000.00
73 Tripleks 9 mm Lbr Meranti 122,000.00
74 Tripleks 6 mm Lbr Meranti 87,000.00
75 Tripleks 4 mm Lbr Meranti 65,000.00
76 Tripleks 3 mm Lbr Meranti 50,000.00
77 Teacwood 3 mm Lbr 100,000.00
78 Teacwood 4 mm Lbr
79 Kursi Plastik Bh Napolyon Sandaran Tanpa Lengan 50,000.00
80 Lem Aica-Aibon kg Aries 50,000.00
81 Plamir Tembok kg Arco
82 Plamir Tembok kg Boyo 5 kg 7,500.00 Harga 37.500 per kaleng
83 Plamir Tembok kg Mexico 5 kg
84 Plamir Tembok kg Master/Weber 4,000.00 Harga 20.000 Per Kaleng
85 Dumpul Kayu kg Pedang 4,500.00 Harga 22.500 Per Kaleng
86 Dumpul Kayu kg Cawan
87 Politur kg Mowilex 65,000.00
88 Vernis kg
89 Meni Kayu ltr Pedang 22,500.00
90 Meni Besi ltr Pedang 22,500.00
91 Cat Besi / Seng kg Arco
92 Cat Seng kg Matex
93 Cat Seng kg Takaraaf
94 Cat Seng kg Belmas 20,000.00
95 Cat Seng kg Jarum
96 Cat Tembok kg Komilex
97 Cat Tembok kg Matex 17,000.00
98 Cat Tembok kg Mawar
99 Cat Tembok kg Aries 7,000.00
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
100 Cat Tembok kg Arco
101 Cat Kayu kg Varaco
102 Cat Kayu kg Mawar
103 Cat Kayu kg Matex
104 Cat Kayu kg Dextro Lux
105 Cat Kayu kg Avian 45,000.00
106 Cat Kayu kg Emco 60,000.00
107 Minyak Cat/Tinner Ltr Biasa 25,000.00
108 Minyak Cat/Tinner Ltr Spesial (A) 32,500.00
109 Amplas Kayu Lbr Kertas Fuji Kasar No. 2" 3,000.00
110 Amplas Kayu Lbr Kertas Fuji Halus No. 5" 3,000.00
111 Amplas Kayu Lbr Kain Flejug Fox Kasar No. 2" 3,000.00
112 Amplas Kayu Lbr Kain Flejug Fox Halus No. 5" 3,000.00
113 Amplas Besi bh 3,000.00
114 Kwas Biasa 4'' bh Medico 10 cm 10,000.00
115 Kwas Biasa 3'' bh Medico 7 cm 7,500.00
116 Kwas Biasa 2'' bh Medico 5 cm 5,000.00
117 Kwas Biasa 1'' bh Medico 2.5 cm 3,500.00
118 Kwas Biasa 3/4'' bh Medico 2 cm 2,000.00
119 Kwas Biasa 1/2'' bh Medico 1.5 cm
120 Kwas Roll bh Imundex 15,000.00
121 Bak / tempat Cat Tembok bh 17,500.00
122 Ember Air bh Anti Pecah 17,500.00
123 Kunci tanam 2 x Putar bh Yuri Loch Factori Panjang 135,000.00 Paori
124 Kunci tanam 2 x Putar bh Fereder
125 Kunci tanam 2 x Putar bh Kuda 65,000.00
126 Kunci tanam 2 x Putar bh Royal 130,000.00
127 Kunci tanam 2 x Putar bh TOP
128 Kunci tanam 2 x Putar bh Yalle 65,000.00
129 Grendel Pintu bh Medico 12,000.00
130 Grendel Pintu bh MDC 2"
131 Grendel Jendela bh Kupu-kupu 3,500.00
132 Grendel Jendela bh RRC 3,500.00
133 Grendel Jendela bh Medico 7,000.00
134 Engsel Pintu bh Hona 4 cm x 3 cm x 3 mm Kuning 17,500.00
135 Engsel Pintu bh Cobra 4 cm x 3 cm x 3 mm Stenlys Stile 17,500.00
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
136 Engsel Jendela bh Hona 3 cm x 2.5 cm x 2.5 mm Kuning 12,500.00
137 Engsel Jendela bh Cobra Stenlys Stile 12,500.00
138 Kait Angin bh Sakura Lipat Kuning 9,000.00
139 Kait Angin bh RRC 5,000.00
140 Kait Angin bh Lipat Kuning 7,000.00
141 Sekring Box bh Broco 1 Lub 35,000.00
142 Sekring Box bh Broco 2 Lub 50,000.00
143 Lampu Phillips 5 watt bh Philips 25,000.00
144 Lampu Phillips 8 watt bh Philips 28,500.00
145 Lampu Phillips 14 watt bh Philips 30,000.00
146 Lampu Phillips 18 watt bh Philips 35,000.00
147 Lampu Phillips 23 watt bh Philips 40,000.00
148 Fiting Lampu bh Broco Tempel Warna Putih 10,000.00
149 Fiting Lampu bh Broco Tempel Warna Hitam 4,500.00
150 Fiting Lampu bh Broco Gantung 3,000.00
151 Saklar Ganda bh Broco Saklar Tanam Seri 15,000.00
152 Saklar Tunggal bh Broco Saklar Tanam Engkel 12,000.00
153 Stop Kontak Lengkap bh Broco 15,000.00
154 Embol Dos bh 2,000.00
155 Kabel Listrik NYM 2 x 1,5 mm Rol Eterna 550,000.00
156 Kabel Listrik NYM 2 x 1,5 mm Rol Blitz
157 Kabel Listrik NYM 2 x 2,5 mm Rol Eterna 800,000.00
158 Kabel Listrik NYM 2 x 2,5 mm Rol Blitz
159 Kabel Listrik NYM 2 x 3.0 mm Rol Eterna
160 Kabel Listrik NYM 2 x 3.0 mm Rol Blitz
161 Klem kabel 10 mm Btg 12,000.00
162 Isolasi Listrik Bh Unible 7,500.00
163 Sekerup 2.5 cm Doz 7,000.00
164 Pipa PVC Ф 5/8" (Pembks Kabel) Bh 7,500.00
165 Pipa PVC 4'' Btg AW Putih
166 Pipa PVC 4'' Btg Maspion Abu-abu / Tebal 265,000.00
167 Pipa PVC 3'' Btg AW Putih
168 Pipa PVC 3'' Btg Maspion Abu-abu / Tebal 185,000.00
169 Pipa PVC 2 1/2'' Btg AW Putih
170 Pipa PVC 2 1/2'' Btg Maspion Abu-abu / Tebal 125,000.00
171 Pipa PVC 2 '' Btg AW Putih
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
172 Pipa PVC 2 '' Btg Maspion Abu-abu / Tebal 100,000.00
173 Pipa PVC 1 1/2'' Btg AW Putih
174 Pipa PVC 1 1/2'' Btg Maspion Abu-abu / Tebal 75,000.00
175 Pipa PVC 1 '' Btg AW Putih
176 Pipa PVC 1 '' Btg Maspion Abu-abu / Tebal 40,000.00
177 Socket PVC 4'' bh 22,500.00
178 Elbow PVC 4'' bh 37,000.00
179 Elbow PVC 1 1/2'' bh 6,000.00
180 Socket PVC 1 1/2'' bh 5,000.00
181 Tee PVC 1 1/2'' bh 7,000.00
182 Knee / Elbow PVC 1 1/2'' bh 6,000.00
183 Lem Paralon bh 7,500.00
184 Kran air 1/2'' dorong bh 17,500.00
185 Floor drain ( Plastik ) bh Plastik 12,000.00
186 Wastafel / Kizincing bh INA 275,000.00
187 Kloset Jongkok bh INA 145,000.00
188 Kloset Jongkok bh KIA
189 Kloset Duduk bh INA 400,000.00
190 Knee / Elbow GIP dia 1/2" bh 5,000.00
191 Watermur GIP dia 1/2" bh 12,000.00
192 Watermur GIP dia 1" bh 17,500.00
193 Tee GIP dia 1" bh 10,000.00
194 Oversock GIP dia 1"-1/2" bh 7,500.00
195 Oversock GIP dia 1"-1/2" bh
196 Pipa GIP dia 1'' btg
197 Pipa GIP dia 1/2'' btg
198 Socket GIP dia 1/2'' bh
199 Socket GIP dia 1'' bh
200 Tee GIP dia 1/2'' bh
201 Selotip bh
202 Lem Silicon bh
203 Pipa Hawa dia 1 1/2" bh 50 cm
204 Pipa Hawa dia 1 1/2" bh 75 cm
II ALAT
. Cangkul bh 60,000.00
206 Linggis bh Sedang (Tidak Berulir) 50,000.00
207 Pick Weel bh 60,000.00
208 Sekop bh Jo Kondao 60,000.00
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
209 Sekop bh Cap Mata 75,000.00
210 Ember Kecil Biasa (Cor) Rol Anti Pecah 8,000.00
211 Ember Kecil Elastis (Cor) bh Anti Pecah 10,000.00
212 Ember (Campuran) bh Anti Pecah 10,000.00
213 Ember (Campuran) bh Anti Pecah 10,000.00
214 Ember Bak (Untuk Matex) m 17,500.00
215 Sendok Semen Bh 12,500.00
216 Setrika Kayu bh 15,000.00
217 Lat /mistar Alluminium bh 22,500.00
218 Benang Nilon bh Plastik 10,000.00
219 Meteran 5 M bh 12,000.00
220 Hamer Kecil bh 17,500.00
221 Hamer Sedang bh 25,000.00
222 Selang waterpas bh 3,000.00
223 Selang Air set Sandflex 180,000.00
224 Terpal bh 3x4m 80,000.00
225 Terpal bh 4x6m 150,000.00
226 Drom Air bh 250,000.00
227 Tanki Air bh 3300 Liter 4,500,000.00
228 Tanki Air bh 5000 Liter 6,500,000.00
229 Gergaji Kayu bh 40,000.00
230 Gagang Gergaji Besi bh 27,500.00
231 Mata Gergaji Waja bh 15,000.00
232 Mata Gergaji Biasa bh 3,000.00
233 Kakatua bh 17,500.00
234 Tang Besar bh 30,000.00
235 Tang Sedang bh 12,000.00
236 Obeng Bunga sedang bh 7,500.00
237 Obeng Plat sedang bh 7,500.00
238 Alat Pemotong Keramik bh 135,000.00
239 Kawat Ayakan halus M' 20,000.00
240 Kawat Ayakan kasar M' 20,000.00
241 Kunci Pipa 1/2'' - 2'' No 26 bh 90,000.00
242 Kunci Pipa 1/2'' - 2'' No 36 bh 160,000.00
243 Kunci Pipa 3'' bh 300,000.00
244 Pisau Dumpul kecil bh 4,000.00
245 Pisau Dumpul besar bh 6,000.00
246 Pisau Plamir kecil bh 3,500.00
247 Pisau Plamir besar bh 6,000.00
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
I. BAHAN
1 Besi Beton Ф 5 mm Btg SNI / Standart pjg = 10,30 m
2 Besi Beton Ф 6 mm Btg SNI / Standart pjg = 12 m 30,000.00
3 Besi Beton Ф 6 mm Btg pjg = 10.30 m Banci 20,000.00
4 Besi Beton Ф 8 mm Btg SNI / Standart pjg = 12 m 42,000.00
5 Besi Beton Ф 8 mm Btg pjg = 10.30 m Banci 30,000.00
6 Besi Beton Ф 10 mm Btg SNI / Standart pjg = 12 m 65,000.00
7 Besi Beton Ф 10 mm Btg pjg = 10.30 m Banci 40,000.00
8 Besi Beton Ф 12 mm Btg SNI / Standart pjg = 12 m 90,000.00
9 Besi Beton Ф 10,2 mm Btg pjg = 10.30 m Banci 60,000.00
10 Besi Siku Btg 40. 40. 4 150,000.00
11 Besi Siku Btg 50. 50. 5 230,000.00
12 Kawat Ikat Kg 25,000.00
13 Beugel U Bulat ø 16 mm - 52.cm Bh
14 Beugel U Plat - 60 cm Bh
15 Plat Strip ≠ 5 mm - 40 cm Bh
16 Baut Bulat Angkur ø 12 mm - 10 cm kg 25,000.00
17 Baut Bulat Angkur ø 12 mm - 15 cm kg
18 Baut Bulat Angkur ø 12 mm - 25 cm kg
19 Baut Bulat ø 12 mm - 30 cm kg 25,000.00
20 Ring/Cincin Baut kg 25,000.00
21 Paku 2-3 cm kg 20,000.00
22 Paku 5 cm kg 17,000.00
23 Paku 7 cm kg 17,000.00
24 Paku 10 cm kg 17,000.00
25 Paku 12 cm kg 17,000.00
26 Paku Beton 7 cm kg 20,000.00
27 Paku Beton 10 cm kg 20,000.00
28 Paku Beton 12 cm kg 20,000.00
29 Paku Seng Kg 25,000.00
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
30 Seng Gelombang BJLS 0,20 mm Lbr Fumira BJLS 0.20 / 180 x 80 Cm 38,500.00
31 Seng Gelombang BJLS 0,30 mm Lbr Fumira BJLS 0.30 / 180 x 80 Cm 62,000.00
32 Seng Gelombang BJLS 0,20 mm Lbr Lokfom BJLS 0.20 / 180 x 80 Cm Gaja Gading/Gaja King
33 Seng Gelombang BJLS 0,30 mm Lbr Lokfom BJLS 0.30 / 180 x 80 Cm Gaja Gading/Gaja King
34 Seng Gelombang BJLA 0,25 mm Lbr BJLA 0.25 / 180 x 80 Cm Baja Lapis Aluminium
35 Seng plat 30 cm m' Lokfom BJLS 0.20 ( Lebar 30 cm ) 12,000.00
36 Seng plat 30 cm m' Lokfom BJLS 0.30 ( Lebar 30 cm )
37 Seng plat 40 cm m' Lokfom BJLS 0.20 ( Lebar 40 cm ) 15,000.00
38 Seng plat 40 cm m' Lokfom BJLS 0.30 ( Lebar 40 cm )
39 Seng Plat 60 cm m' BJLS 0.20 ( Lebar 60 cm ) 25,000.00
40 Seng Plat 60 cm m' BJLS 0.30 ( Lebar 60 cm )
41 Seng Plat 80 cm m' BJLS 0.20 ( Lebar 80 cm ) 30,000.00
42 Seng Plat 80 cm m' BJLS 0.30 ( Lebar 80 cm )
43 Seng Plat 100 cm m' BJLS 0.30 ( Lebar 100 cm )
44 Keramik 40 x 40 cm Putih Polos dos Asia Tile 40 cm x 40 cm KW 1 50,000.00
45 Keramik 40 x 40 cm Bermotif dos Kobin 40 cm x 40 cm
46 Keramik 30 x 30 cm Putih Polos dos Asia Tile 30 cm x 30 cm KW 1 40,000.00
47 Keramik 30 x 30 cm Bermotif dos Asia Tile 30 cm x 30 cm KW 1 47,500.00
48 Keramik 30 x 30 cm Bermotif dos AIKAD 30 cm x 30 cm KW 1 45,000.00
49 Keramik 20 x 20 cm Putih Polos Dos Asia Tile 20 cm x 20 cm
50 Keramik 20 x 20 cm Bermotif Dos Asia Tile 20 cm x 20 cm
51 Keramik 20 x 25 cm Bermotif Dos Kobin 20 cm x 25 cm
52 Keramik 20 x 25 cm Bermotif Dos Asia 20 cm x 25 cm
53 Keramik 20 x 25 cm Bermotif Dos Masterina 20 cm x 25 cm
54 Keramik 20 x 25 cm Bermotif Dos IKAD 20 cm x 25 cm
55 Keramik 20 x 25 cm Bertekstur (Wc/Km) Dos IKAD 20 cm x 25 cm
56 Keramik 20 x 25 cm Bertekstur (Wc/Km) Dos Asia 20 cm x 25 cm
57 Plint Keramik 10 x 20 cm Bh 7,500.00
58 Tegel Wafel 20 x 25 cm Dos
59 Semen Gersik Zak ukr 50 kg/ sak PPC (Semen Portland Pozolan)
60 Semen Gersik Zak ukr 40 kg/ sak PPC (Semen Portland Pozolan)
61 Semen Tonasa Zak ukr 50 kg/ sak
62 Semen Tonasa Zak ukr 40 kg/ sak
63 Semen Bosowa Zak ukr 50 kg/ sak 60,000.00
64 Semen Bosowa Zak ukr 40 kg/ sak 50,000.00
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
65 Semen Tiga Roda Zak ukr 40 kg/ sak
66 Semen Putih Zak 110,000.00
67 Semen Putih kg 5,000.00
68 Semen Warna ……… kg 15,000.00
69 Kaca Bening 3 mm M2 130,000.00
70 Kaca Riben/Gelap 3 mm M2 140,000.00
71 Kaca Bening 5 mm M2 150,000.00
72 Kaca Riben/Gelap 5 mm M2 160,000.00
73 Tripleks 9 mm Lbr Meranti 125,000.00
74 Tripleks 6 mm Lbr Meranti 80,000.00
75 Tripleks 4 mm Lbr Meranti 65,000.00
76 Tripleks 3 mm Lbr Meranti 52,000.00
77 Teacwood 3 mm Lbr 100,000.00
78 Teacwood 4 mm Lbr
79 Kursi Plastik Bh Napolyon Sandaran Tanpa Lengan
80 Lem Aica-Aibon kg Aries 50,000.00
81 Plamir Tembok kg Arco
82 Plamir Tembok kg Boyo 5 kg 9,000.00 45,000.00
83 Plamir Tembok kg Mexico 5 kg
84 Plamir Tembok kg Master/Weber
85 Dumpul Kayu kg Pedang 5,000.00 25,000.00
86 Dumpul Kayu kg Cawan
87 Politur kg Mowilex
88 Vernis kg
89 Meni Kayu ltr Pedang 25,000.00
90 Meni Besi ltr Pedang
91 Cat Besi / Seng kg Arco
92 Cat Seng kg Matex
93 Cat Seng kg Takaraaf
94 Cat Seng kg Belmas
95 Cat Seng kg Jarum
96 Cat Tembok kg Komilex
97 Cat Tembok kg Matex 17,000.00 85,000.00
98 Cat Tembok kg Mawar
99 Cat Tembok kg Aries
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
100 Cat Tembok kg Arco
101 Cat Kayu kg Varaco
102 Cat Kayu kg Mawar
103 Cat Kayu kg Matex
104 Cat Kayu kg Dextro Lux
105 Cat Kayu kg Avian
106 Cat Kayu kg Emco 65,000.00
107 Minyak Cat/Tinner Ltr Biasa
108 Minyak Cat/Tinner Ltr Spesial (A) 35,000.00
109 Amplas Kayu Lbr Kertas Fuji Kasar No. 2"
110 Amplas Kayu Lbr Kertas Fuji Halus No. 5"
111 Amplas Kayu Lbr Kain Flejug Fox Kasar No. 2"
112 Amplas Kayu Lbr Kain Flejug Fox Halus No. 5"
113 Amplas Besi bh
114 Kwas Biasa 4'' bh Medico 10 cm 10,000.00
115 Kwas Biasa 3'' bh Medico 7 cm 7,000.00
116 Kwas Biasa 2'' bh Medico 5 cm 5,000.00
117 Kwas Biasa 1'' bh Medico 2.5 cm
118 Kwas Biasa 3/4'' bh Medico 2 cm
119 Kwas Biasa 1/2'' bh Medico 1.5 cm
120 Kwas Roll bh Imundex 15,000.00
121 Bak / tempat Cat Tembok bh 15,000.00
122 Ember Air bh Anti Pecah
123 Kunci tanam 2 x Putar bh Yuri Loch Factori Panjang 135,000.00 Paori
124 Kunci tanam 2 x Putar bh Fereder
125 Kunci tanam 2 x Putar bh Kuda 90,000.00
126 Kunci tanam 2 x Putar bh Royal
127 Kunci tanam 2 x Putar bh TOP 60,000.00
128 Kunci tanam 2 x Putar bh Yalle 75,000.00
129 Grendel Pintu bh Medico 15,000.00 Merek King
130 Grendel Pintu bh MDC 2"
131 Grendel Jendela bh Kupu-kupu 7,500.00 Merek King
132 Grendel Jendela bh RRC
133 Grendel Jendela bh Medico
134 Engsel Pintu bh Hona 4 cm x 3 cm x 3 mm Kuning 15,000.00 Merek King
135 Engsel Pintu bh Cobra 4 cm x 3 cm x 3 mm Stenlys Stile
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
136 Engsel Jendela bh Hona 3 cm x 2.5 cm x 2.5 mm Kuning 10,000.00 Merek King
137 Engsel Jendela bh Cobra Stenlys Stile
138 Kait Angin bh Sakura Lipat Kuning
139 Kait Angin bh RRC 20,000.00 merek King
140 Kait Angin bh Lipat Kuning
141 Sekring Box bh Broco 1 Lub 40,000.00
142 Sekring Box bh Broco 2 Lub
143 Lampu Phillips 5 watt bh Philips
144 Lampu Phillips 8 watt bh Philips
145 Lampu Phillips 14 watt bh Philips
146 Lampu Phillips 18 watt bh Philips
147 Lampu Phillips 23 watt bh Philips 45,000.00 20 watt
148 Fiting Lampu bh Broco Tempel Warna Putih 15,000.00
149 Fiting Lampu bh Broco Tempel Warna Hitam
150 Fiting Lampu bh Broco Gantung
151 Saklar Ganda bh Broco Saklar Tanam Seri 20,000.00
152 Saklar Tunggal bh Broco Saklar Tanam Engkel 15,000.00
153 Stop Kontak Lengkap bh Broco 17,500.00
154 Embol Dos bh 2,500.00
155 Kabel Listrik NYM 2 x 1,5 mm Rol Eterna 575,000.00
156 Kabel Listrik NYM 2 x 1,5 mm Rol Blitz
157 Kabel Listrik NYM 2 x 2,5 mm Rol Eterna 850,000.00
158 Kabel Listrik NYM 2 x 2,5 mm Rol Blitz
159 Kabel Listrik NYM 2 x 3.0 mm Rol Eterna
160 Kabel Listrik NYM 2 x 3.0 mm Rol Blitz
161 Klem kabel 10 mm Btg 15,000.00
162 Isolasi Listrik Bh Unible 10,000.00
163 Sekerup 2.5 cm Doz 10,000.00
164 Pipa PVC Ф 5/8" (Pembks Kabel) Bh
165 Pipa PVC 4'' Btg AW Putih
166 Pipa PVC 4'' Btg Maspion Abu-abu / Tebal
167 Pipa PVC 3'' Btg AW Putih
168 Pipa PVC 3'' Btg Maspion Abu-abu / Tebal 70,000.00
169 Pipa PVC 2 1/2'' Btg AW Putih
170 Pipa PVC 2 1/2'' Btg Maspion Abu-abu / Tebal
171 Pipa PVC 2 '' Btg AW Putih
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
172 Pipa PVC 2 '' Btg Maspion Abu-abu / Tebal 50,000.00
173 Pipa PVC 1 1/2'' Btg AW Putih
174 Pipa PVC 1 1/2'' Btg Maspion Abu-abu / Tebal 35,000.00
175 Pipa PVC 1 '' Btg AW Putih
176 Pipa PVC 1 '' Btg Maspion Abu-abu / Tebal
177 Socket PVC 4'' bh
178 Elbow PVC 4'' bh
179 Elbow PVC 1 1/2'' bh
180 Socket PVC 1 1/2'' bh
181 Tee PVC 1 1/2'' bh
182 Knee / Elbow PVC 1 1/2'' bh 5,000.00 maspion
183 Lem Paralon bh 6,000.00
184 Kran air 1/2'' dorong bh
185 Floor drain ( Plastik ) bh Plastik 30,000.00 aluminium
186 Wastafel / Kizincing bh INA 300,000.00
187 Kloset Jongkok bh INA 150,000.00
188 Kloset Jongkok bh KIA
189 Kloset Duduk bh INA
190 Knee / Elbow GIP dia 1/2" bh
191 Watermur GIP dia 1/2" bh 12,500.00
192 Watermur GIP dia 1" bh 20,000.00
193 Tee GIP dia 1" bh 12,500.00
194 Oversock GIP dia 1"-1/2" bh 8,500.00
195 Oversock GIP dia 1"-1/2" bh 8,500.00
196 Pipa GIP dia 1'' btg 185,000.00 medium B - BSA Super Tebal
197 Pipa GIP dia 1/2'' btg 125,000.00 medium B - BSA Super Tebal
198 Socket GIP dia 1/2'' bh 4,000.00
199 Socket GIP dia 1'' bh 7,000.00
200 Tee GIP dia 1/2'' bh 6,000.00
201 Selotip bh
202 Lem Silicon bh
203 Pipa Hawa dia 1 1/2" bh 50 cm
204 Pipa Hawa dia 1 1/2" bh 75 cm
ALAT
205 Cangkul bh
206 Linggis bh Sedang (Tidak Berulir) 50,000.00
207 Pick Weel bh 60,000.00
208 Sekop bh Jo Kondao 55,000.00
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
209 Sekop bh Cap Mata
210 Ember Kecil Biasa (Cor) Rol Anti Pecah 10,000.00
211 Ember Kecil Elastis (Cor) bh Anti Pecah
212 Ember (Campuran) bh Anti Pecah
213 Ember (Campuran) bh Anti Pecah
214 Ember Bak (Untuk Matex) m
215 Sendok Semen Bh
216 Setrika Kayu bh
217 Lat /mistar Alluminium bh
218 Benang Nilon bh Plastik 10,000.00
219 Meteran 5 M bh 15,000.00
220 Hamer Kecil bh
221 Hamer Sedang bh 45,000.00
222 Selang waterpas bh 3,000.00 per meter
223 Selang Air set Sandflex 175,000.00 Roll
224 Terpal bh 3x4m 75,000.00
225 Terpal bh 4x6m 145,000.00
226 Drom Air bh
227 Tanki Air bh 3300 Liter 4,750,000.00
228 Tanki Air bh 5000 Liter 6,000,000.00
229 Gergaji Kayu bh
230 Gagang Gergaji Besi bh
231 Mata Gergaji Waja bh
232 Mata Gergaji Biasa bh
233 Kakatua bh 30,000.00
234 Tang Besar bh 20,000.00
235 Tang Sedang bh 17,500.00
236 Obeng Bunga sedang bh 10,000.00
237 Obeng Plat sedang bh 10,000.00
238 Alat Pemotong Keramik bh 350,000.00
239 Kawat Ayakan halus M'
240 Kawat Ayakan kasar M'
241 Kunci Pipa 1/2'' - 2'' No 26 bh
242 Kunci Pipa 1/2'' - 2'' No 36 bh
243 Kunci Pipa 3'' bh
244 Pisau Dumpul kecil bh
245 Pisau Dumpul besar bh
246 Pisau Plamir kecil bh
247 Pisau Plamir besar bh 6,000.00
ONGKOS ANGKUT
HARGA SATUAN KE LOKASI
NO NAMA BAHAN/ALAT SAT SPESIFIKASI KETERANGAN
(Rp) (Rp)
A PERMAINAN EDUKATIF LUAR
1 Seluncuran Set Pipa Ø 1 1/2" + plat etsel 2,500,000.00
2 Seluncur + Rumah Set Pipa Ø 1 1/2" + plat etsel 3,500,000.00
3 Seluncuran Dua Arah Set Pipa Ø 1 1/2" + plat etsel 4,500,000.00
4 Jungkat Jangkit Set Papan Kls I + Pipa Ø 1 1/2" 1,500,000.00
5 Ayunan Super + Tenda Set Pipa Ø 1 1/2" + plat etsel (kursi sepasang) 3,000,000.00
6 Ayuanan Besar Set Pipa Ø 1 1/2" + plat etsel (dua dudukan) 1,750,000.00
7 Ayunan Sedang Set Pipa Ø 1 1/2" + plat etsel 1,500,000.00
8 Ayunan Kecil Set Pipa Ø 1 1/2" + plat etsel 1,250,000.00
9 Ayunan Rantai Set Pipa Ø 1 1/2" + plat etsel 1,500,000.00
10 Bola Dunia Set Pipa Ø 1 1/2" + plat etsel 3,500,000.00
11 Bola Keranjang Set Pipa Ø 1 1/2" -
12 Jembatan Goyang Set Plat strip + Pipa Ø 1 1/2" 2,000,000.00
13 Tangga Majemuk Set Pipa Ø 1 1/2" 3,000,000.00
14 Tangga pelangi Set Pipa Ø 1 1/2" 1,750,000.00
15 Gelas Putar Set Pipa Ø 3/4" + Plat 3,000,000.00
16 Gelas Putar + Tenda Set Pipa Ø 3/4" + kain tenda 3,500,000.00
17 Bak Pasir Set -
18 Bak Air Set -
19 Papan Titian Set Papan Kls I 750,000.00
20 Kereta Dorong Set Plastik 500,000.00
21 Sepeda Roda Set Jadi + Pabrik (Besi + Plastik) 750,000.00
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT SPESIFIKASI KE LOKASI KETERANGAN
(Rp) (Rp)
22 Taman Lalulintas Set -
23 Panjat Tebing Set -
24 Akuarium Lengkap Set 1,000,000.00
25 Timbangan Set 750,000.00
C PERMAINAN MANIPULATIF
1 Mozaika Set -
2 Nuansa Warna Set 60,000.00
3 Papan Jamur Set 50,000.00
4 Lek Puzzio Set 50,000.00
5 Papan Geometri Set 40,000.00
6 Permaianan Lotto Set 40,000.00
7 Pohon Hitung Set 10,000.00
8 Kotak Hitung Set 10,000.00
9 Kotak Merjan Set 25,000.00
10 Kubus Berpola Set 50,000.00
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT SPESIFIKASI KE LOKASI KETERANGAN
(Rp) (Rp)
D PERMAINAN KESENIAN
1 Gitar Kecil Bh Plastik/kain 75,000.00
2 Pangung Sandiwara Boneka Set Plastik/kain 45,000.00
3 Boneka Berbentuk Orang Bh Plastik/kain 45,000.00
4 Boneka Berbentuk Binatang Bh Plastik/kain 75,000.00
(YOS M. WITIN)
(.................................................)
SURVEY HARGA SATUAN
PROPINSI : NTT CV/UD/Perorangan : Dua Kembar
KABUPATEN : FLORES TIMUR ALAMAT : Postoh- Larantuka
STATUS : 18 Maret 2011
ONGKOS ANGKUT
HARGA SATUAN KE LOKASI
NO NAMA BAHAN/ALAT SAT SPESIFIKASI KETERANGAN
(Rp) (Rp)
A PERMAINAN EDUKATIF LUAR
1 Seluncuran Set Pipa Ø 1 1/2" + plat etsel 3,700,000.00
2 Seluncur + Rumah Set Pipa Ø 1 1/2" + plat etsel
3 Seluncuran Dua Arah Set Pipa Ø 1 1/2" + plat etsel
4 Jungkat Jangkit Set Papan Kls I + Pipa Ø 1 1/2" 2,600,000.00
5 Ayunan Super + Tenda Set Pipa Ø 1 1/2" + plat etsel (kursi sepasang)
6 Ayuanan Besar Set Pipa Ø 1 1/2" + plat etsel (dua dudukan) 4,200,000.00
7 Ayunan Sedang Set Pipa Ø 1 1/2" + plat etsel
8 Ayunan Kecil Set Pipa Ø 1 1/2" + plat etsel
9 Ayunan Rantai Set Pipa Ø 1 1/2" + plat etsel
10 Bola Dunia Set Pipa Ø 1 1/2" + plat etsel
11 Bola Keranjang Set Pipa Ø 1 1/2"
12 Jembatan Goyang Set Plat strip + Pipa Ø 1 1/2"
13 Tangga Majemuk Set Pipa Ø 1 1/2"
14 Tangga pelangi Set Pipa Ø 1 1/2" 3,500,000.00
15 Gelas Putar Mangkuk Putar Set Pipa Ø 3/4" + Plat 5,200,000.00
16 Gelas Putar + Tenda Set Pipa Ø 3/4" + kain tenda
17 Bak Pasir Set
18 Bak Air Set
19 Papan Titian Set Papan Kls I
20 Kereta Dorong Set Plastik
21 Sepeda Roda Set Jadi + Pabrik (Besi + Plastik)
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT SPESIFIKASI KE LOKASI KETERANGAN
(Rp) (Rp)
22 Taman Lalulintas Set
23 Panjat Tebing Set
24 Akuarium Lengkap Set 750,000.00
25 Timbangan Set 100,000.00
C PERMAINAN MANIPULATIF
1 Mozaika Set
2 Nuansa Warna Set
3 Papan Jamur Set
4 Lek Puzzio Set
5 Papan Geometri Set
6 Permaianan Lotto Set
7 Pohon Hitung Set
8 Kotak Hitung Set
9 Kotak Merjan Set
10 Kubus Berpola Set
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT SPESIFIKASI KE LOKASI KETERANGAN
(Rp) (Rp)
D PERMAINAN KESENIAN
1 Gitar Kecil Bh Plastik/kain 150,000.00
2 Pangung Sandiwara Boneka Set Plastik/kain
3 Boneka Berbentuk Orang Bh Plastik/kain
4 Boneka Berbentuk Binatang Bh Plastik/kain
(JAKA ISMADI)
(.................................................)
SURVEY HARGA SATUAN
PROPINSI : NTT CV/UD/Perorangan : Dua Kembar
KABUPATEN : FLORES TIMUR ALAMAT : Postoh- Larantuka
STATUS : 18 Maret 2011
ONGKOS ANGKUT
HARGA SATUAN KE LOKASI
NO NAMA BAHAN/ALAT SAT SPESIFIKASI KETERANGAN
(Rp) (Rp)
A PERMAINAN EDUKATIF LUAR
1 Seluncuran Set Pipa Ø 1 1/2" + plat etsel 3,700,000.00
2 Seluncur + Rumah Set Pipa Ø 1 1/2" + plat etsel
3 Seluncuran Dua Arah Set Pipa Ø 1 1/2" + plat etsel
4 Jungkat Jangkit Set Papan Kls I + Pipa Ø 1 1/2" 2,600,000.00
5 Ayunan Super + Tenda Set Pipa Ø 1 1/2" + plat etsel (kursi sepasang)
6 Ayuanan Besar Set Pipa Ø 1 1/2" + plat etsel (dua dudukan) 4,200,000.00
7 Ayunan Sedang Set Pipa Ø 1 1/2" + plat etsel
8 Ayunan Kecil Set Pipa Ø 1 1/2" + plat etsel
9 Ayunan Rantai Set Pipa Ø 1 1/2" + plat etsel
10 Bola Dunia Set Pipa Ø 1 1/2" + plat etsel
11 Bola Keranjang Set Pipa Ø 1 1/2"
12 Jembatan Goyang Set Plat strip + Pipa Ø 1 1/2"
13 Tangga Majemuk Set Pipa Ø 1 1/2"
14 Tangga pelangi Set Pipa Ø 1 1/2" 3,500,000.00
15 Gelas Putar Mangkuk Putar Set Pipa Ø 3/4" + Plat 5,200,000.00
16 Gelas Putar + Tenda Set Pipa Ø 3/4" + kain tenda
17 Bak Pasir Set
18 Bak Air Set
19 Papan Titian Set Papan Kls I
20 Kereta Dorong Set Plastik
21 Sepeda Roda Set Jadi + Pabrik (Besi + Plastik)
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT SPESIFIKASI KE LOKASI KETERANGAN
(Rp) (Rp)
22 Taman Lalulintas Set
23 Panjat Tebing Set
24 Akuarium Lengkap Set
25 Timbangan Set
C PERMAINAN MANIPULATIF
1 Mozaika Set
2 Nuansa Warna Set
3 Papan Jamur Set
4 Lek Puzzio Set
5 Papan Geometri Set
6 Permaianan Lotto Set
7 Pohon Hitung Set
8 Kotak Hitung Set
9 Kotak Merjan Set
10 Kubus Berpola Set
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT SPESIFIKASI KE LOKASI KETERANGAN
(Rp) (Rp)
D PERMAINAN KESENIAN
1 Gitar Kecil Bh Plastik/kain
2 Pangung Sandiwara Boneka Set Plastik/kain
3 Boneka Berbentuk Orang Bh Plastik/kain
4 Boneka Berbentuk Binatang Bh Plastik/kain
(YOS M. WITIN)
(.................................................)
SURVEY HARGA SATUAN UPAH
PROPINSI : NTT
KABUPATEN : FLORES TIMUR
KECAMATAN : WULANGGITANG STATUS : ……………………..2011
HARGA SATUAN
NO NAMA TENAGA KERJA SAT SPESIFIKASI PARAF KETERANGAN
(RP.)
6 /Titik 350,000.00 Tukang Listrik Bahan ditanggung oleh Instalatir, selain bola lampu
HARGA SATUAN
NO. UPAH PEKERJAAN SAT. SPESIFIKASI KETERANGAN
(RP)
1 Pemasangan Meteran Listrik / Paket 2,800,000.00 Daya 900 VA Bonus Box Sekring, instalasi 3 titik lampu
2 Pemasangan Meteran Listrik / Paket 3,200,000.00 Daya 1300 VA Bonus Box Sekring, instalasi 3 titik lampu
……………………………., …………………..2011
Disurvey Oleh
(.......................................................)
HARGA SATUAN
NO NAMA TENAGA KERJA SAT SPESIFIKASI PARAF KETERANGAN
(RP.)
PROPINSI : NTT
KABUPATEN : FLORES TIMUR
KECAMATAN : WULANGGITANG STATUS : ……………………..2011
HARGA SATUAN
NO NAMA TENAGA KERJA SAT SPESIFIKASI PARAF KETERANGAN
(RP.)
HARGA SATUAN
NO. UPAH PEKERJAAN SAT. SPESIFIKASI KETERANGAN
(RP)
1 Pemasangan Meteran Listrik / Paket Daya……………….. Bonus Sekring Box dan instalisi ……… titik lampu
2 Pemasangan Meteran Listrik / Paket Daya……………….. Bonus Sekring Box dan instalisi ……… titik lampu
3 Pemasangan Meteran Listrik / Paket Daya……………….. Bonus Sekring Box dan instalisi ……… titik lampu
……………………………., …………………..2011
Disurvey Oleh
(.......................................................)
HARGA JARAK HARGA ONGKOS JUMLAH JUMLAH
DI ANGKUT ANGKUT ANGKUT HARGA HARGA
NO MATERIAL SATUAN RATA2 RATA2/KM /UNIT TOTAL AKHIR
KE LOKASI KE LOKASI KE LOKASI KE LOKASI KE LOKASI
(Rp.) (KM) (Rp.) (Rp/Km) (Rp) (Rp)
A B C D H I J=HXI K=G+J L
LOKAL
PASIR, BATU, AIR KERJA
1 Pasir pasang M³ 14.00 30.00 0.00 0.00 0.00
2 Pasir urug / Sirtu M³ 14.00 400.00 5,600.00 5,600.00 6,000.00
3 Tanah urug M³ 14.00 400.00 5,600.00 5,600.00 6,000.00
4 Batu 15/20 M³
5 Kerikil uk. 2/3 M³
6 Batu Bata Bh
7 Papan Cor Lbr
Mengetahui
( .......................................................) ( .......................................................)
PNPM Mandiri - Perdesaan
KAYU
1 Papan 3/20-4 kls III bowplank Btg 90,000.00 70,000.00 85,000.00 82,000.00 12.00 1,000.00 12,000.00 94,000.00 94,000.00
2 Kayu 5/7-4 kls III stelan Btg 42,000.00 39,000.00 37,500.00 40,000.00 12.00 1,000.00 12,000.00 52,000.00 52,000.00
3 Kayu Kuda2 6/12 klas II Btg 270,000.00 200,000.00 235,000.00 12.00 1,000.00 12,000.00 247,000.00 247,000.00
4 Papan jepit 4/12 lbr 67,500.00 50,000.00 59,000.00 12.00 1,000.00 12,000.00 71,000.00 71,000.00
5 Balok kayu 5/10 klas II Btg 70,000.00 65,000.00 90,000.00 75,000.00 12.00 1,000.00 12,000.00 87,000.00 87,000.00
6 Papan klas II 3/25/4 (listplank) Lbr 125,000.00 85,000.00 105,000.00 12.00 1,000.00 12,000.00 117,000.00 117,000.00
7 Usuk kayu 4/6 klas II (r. Plafond) Btg 40,000.00 35,000.00 40,000.00 38,000.00 12.00 1,000.00 12,000.00 50,000.00 50,000.00
8 List plafond kayu profil Lbr 40,000.00 37,500.00 37,500.00 38,000.00 12.00 500.00 6,000.00 44,000.00 44,000.00
HARGA HARGA HARGA JARAK HARGA ONGKOS JUMLAH JUMLAH
DI DI DI ANGKUT ANGKUT ANGKUT HARGA HARGA
NO MATERIAL SATUAN RATA - RATA
RATA2 RATA2/KM /UNIT TOTAL
(Rp.) (Rp.) (Rp.) (KM) (Rp.) (Rp/Km) (Rp)
A B C D E F G H I J=HXI K=G+J L
BATA
1 Batako Bh - 2.00 100.00 200.00 200.00 0.00
2 Batu merah Bh 650.00 700.00 700.00 650.00 2.00 100.00 200.00 850.00 850.00
PASIR BATU
1 Pasir pasang M³ 200,000.00 200,000.00 200,000.00 15.00 3,000.00 45,000.00 245,000.00 245,000.00
2 Pasir urug M³ 180,000.00 185,000.00 180,000.00 15.00 3,000.00 45,000.00 225,000.00 225,000.00
3 Tanah urug M³ 160,000.00 170,000.00 160,000.00 15.00 3,000.00 45,000.00 205,000.00 205,000.00
4 Batu 15/20 M³ 220,000.00 230,000.00 220,000.00 15.00 3,000.00 45,000.00 265,000.00 265,000.00
5 Kerikil uk. 2/3 M³ 300,000.00 400,000.00 300,000.00 15.00 3,000.00 45,000.00 345,000.00 345,000.00
HARGA HARGA HARGA JARAK HARGA ONGKOS JUMLAH JUMLAH
DI DI DI ANGKUT ANGKUT ANGKUT HARGA HARGA
NO MATERIAL SATUAN RATA - RATA
TOKO INDAH LIMA JAYA Panca Tunggal RATA2 RATA2/KM /UNIT TOTAL AKHIR
(Rp.) (Rp.) (Rp.) (KM) (Rp.) (Rp/Km) (Rp) (Rp)
A B C D E F G H I J=HXI K=G+J L
NON LOKAL
1 Paku biasa 5 cm kg 17,500.00 15,000.00 15,000.00 15,000.00 12.00 100.00 1,200.00 16,200.00 16,000.00
2 Semen 40 kg zak 57,000.00 51,000.00 54,000.00 51,000.00 12.00 500.00 6,000.00 57,000.00 57,000.00
3 Besi polos D 12 mm SNI btg 115,000.00 110,000.00 110,000.00 110,000.00 12.00 500.00 6,000.00 116,000.00 116,000.00
4 Kawat beton kg 25,000.00 20,000.00 20,000.00 20,000.00 12.00 100.00 1,200.00 21,200.00 21,000.00
5 Besi polos D 6 mm SNI btg 30,000.00 30,000.00 32,500.00 30,000.00 12.00 500.00 6,000.00 36,000.00 36,000.00
6 Seng Gel. BJLS 0,30 lbr 70,000.00 65,000.00 70,000.00 65,000.00 12.00 200.00 2,400.00 67,400.00 67,000.00
7 Paku seng kg 25,000.00 20,000.00 25,000.00 20,000.00 12.00 30.00 360.00 20,360.00 20,000.00
8 Seng plat 0,30 m 25,000.00 15,000.00 20,000.00 15,000.00 12.00 30.00 360.00 15,360.00 15,000.00
9 Paku 12 (Paku Putih) kg 25,000.00 25,000.00 25,000.00 25,000.00 12.00 30.00 360.00 25,360.00 25,000.00
10 Paku 10 biasa kg 17,500.00 15,000.00 17,500.00 15,000.00 12.00 100.00 1,200.00 16,200.00 16,000.00
11 Plat Strip 4 - 60 cm bh 40,000.00 50,000.00 50,000.00 40,000.00 12.00 30.00 0.00 40,000.00 40,000.00
12 Plat Strip 4 - 20 cm bh 25,000.00 25,000.00 25,000.00 25,000.00 12.00 30.00 0.00 25,000.00 25,000.00
13 Beugel U bulat 3 - 60 cm bh 55,000.00 50,000.00 50,000.00 50,000.00 12.00 30.00 0.00 50,000.00 50,000.00
14 Mor Baut ø 3/8 - 12 cm bh 4,000.00 5,000.00 5,000.00 4,000.00 12.00 30.00 0.00 4,000.00 4,000.00
15 Mor Baut ø 3/8 - 25 cm bh 7,500.00 6,000.00 6,000.00 6,000.00 12.00 30.00 360.00 6,360.00 6,000.00
16 Ring/Cinci Baut bh 1,000.00 1,000.00 1,000.00 1,000.00 12.00 50.00 0.00 1,000.00 1,000.00
17 Paku 7 cm kg 17,500.00 15,000.00 17,500.00 15,000.00 12.00 30.00 0.00 15,000.00 15,000.00
18 Keramik 40x40 cm dos 75,000.00 65,000.00 75,000.00 65,000.00 12.00 100.00 1,200.00 66,200.00 66,000.00
19 Semen warna kg 15,000.00 7,000.00 10,000.00 7,000.00 12.00 100.00 1,200.00 8,200.00 8,000.00
20 Keramik 20x20 cm dos 75,000.00 65,000.00 75,000.00 65,000.00 12.00 100.00 1,200.00 66,200.00 66,000.00
21 Keramik lantai WC 20x20 cm dos 75,000.00 65,000.00 65,000.00 65,000.00 12.00 30.00 360.00 65,360.00 65,000.00
22 Plywood 3 mm lbr 60,000.00 58,000.00 58,000.00 58,000.00 12.00 30.00 0.00 58,000.00 58,000.00
23 Paku tripleks kg 30,000.00 20,000.00 20,000.00 20,000.00 12.00 30.00 0.00 20,000.00 20,000.00
24 Cat seng (biru laut) kg 85,000.00 85,000.00 85,000.00 85,000.00 12.00 100.00 1,200.00 86,200.00 86,000.00
25 Cat plafond (Putih) Ember 275,000.00 185,000.00 185,000.00 185,000.00 12.00 100.00 1,200.00 186,200.00 186,000.00
26 Cat dinding (kuning telur) Ember 275,000.00 185,000.00 185,000.00 185,000.00 12.00 100.00 1,200.00 186,200.00 186,000.00
27 Cat listplank (merah hati) kg 40,000.00 40,000.00 40,000.00 12.00 100.00 1,200.00 41,200.00 41,000.00
28 Neon (Philips) 40 Watt bh 80,000.00 80,000.00 80,000.00 12.00 100.00 1,200.00 81,200.00 81,000.00
29 Saklar Ganda bh 20,000.00 20,000.00 20,000.00 12.00 100.00 1,200.00 21,200.00 21,000.00
30 Saklar Tunggal bh 15,000.00 15,000.00 15,000.00 12.00 70.00 0.00 15,000.00 15,000.00
31 Stop Kontak bh 20,000.00 20,000.00 20,000.00 12.00 70.00 0.00 20,000.00 20,000.00
32 Pipa PVC Ø 4'' btg 170,000.00 170,000.00 275,000.00 170,000.00 12.00 70.00 0.00 170,000.00 170,000.00
33 Soket PVC 4'' 135° bh 25,000.00 20,000.00 20,000.00 12.00 70.00 0.00 20,000.00 20,000.00
34 Pipa PVC Ø 2'' btg 170,000.00 170,000.00 170,000.00 12.00 70.00 0.00 170,000.00 170,000.00
35 Soket PVC 2'' 135° bh 25,000.00 20,000.00 20,000.00 12.00 70.00 0.00 20,000.00 20,000.00
36 Lem Paralon bh 10,000.00 10,000.00 10,000.00 10,000.00 12.00 70.00 0.00 10,000.00 10,000.00
37 Socket PVC Ø 4" bh 45,000.00 50,000.00 50,000.00 45,000.00 12.00 70.00 0.00 45,000.00 45,000.00
38 Socket PVC Ø 2" bh 45,000.00 50,000.00 50,000.00 45,000.00 12.00 100.00 1,200.00 46,200.00 46,000.00
39 Kloset Jongkok bh 175,000.00 150,000.00 150,000.00 12.00 100.00 0.00 150,000.00 150,000.00
40 Bak Penampung 2200 Ltr bh 3,500,000.00 3,850,000.00 3,500,000.00 12.00 30.00 0.00 3,500,000.00 3,500,000.00
41 Fool drain bh 50,000.00 50,000.00 50,000.00 50,000.00 12.00 30.00 50,000.00 50,000.00
42 Benang Nilon roll 10,000.00 10,000.00 10,000.00 10,000.00 12.00 30.00 10,000.00 10,000.00
PERALATAN
1 Linggis bh 65,000.00 60,000 60,000 60,000.00 12.00 500.00 6,000.00 66,000.00 66,000.00
2 Cangkul bh 60,000.00 60,000 60,000 60,000.00 12.00 500.00 6,000.00 66,000.00 66,000.00
3 Sekop bh 65,000.00 85,000 50,000 50,000.00 12.00 500.00 6,000.00 56,000.00 56,000.00
4 Ember bh 10,000.00 10,000 15,000 10,000.00 12.00 100.00 1,200.00 11,200.00 11,000.00
5 Kuas biasa bh 15,000.00 15,000 15,000 15,000.00 12.00 - 0.00 15,000.00 15,000.00
6 Kuas roll bh 20,000.00 20,000.00 20,000.00 12.00 100.00 1,200.00 21,200.00 21,000.00
7 Kawat Ayak m' 25,000.00 25,000.00 25,000.00 25,000.00 12.00 30.00 0.00 25,000.00 25,000.00
8 Benang Nilon Roll 10,000.00 10,000.00 10,000.00 10,000.00 12.00 30.00 0.00 10,000.00 10,000.00
9 Terpal 4 x 6 bh 360,000.00 360,000.00 360,000.00 360,000.00 12.00 30.00 500.00 360,500.00 361,000.00
LISTRIK
1 Instalasi Listrik 900 watt ls 6,500,000.00 6,500,000.00 12.00 30.00 0.00 6,500,000.00 6,500,000.00
2 Neon (Philips) 40 Watt bh 80,000.00 80,000.00 80,000.00 12.00 30.00 0.00 80,000.00 80,000.00
3 Saklar Ganda bh 20,000.00 20,000.00 20,000.00 12.00 30.00 0.00 20,000.00 20,000.00
4 Saklar Tunggal bh 15,000.00 15,000.00 15,000.00 12.00 30.00 0.00 15,000.00 15,000.00
5 Stop Kontak bh 20,000.00 25,000.00 20,000.00 12.00 30.00 0.00 20,000.00 20,000.00
HARGA HARGA HARGA JARAK HARGA ONGKOS JUMLAH JUMLAH
DI DI DI ANGKUT ANGKUT ANGKUT HARGA HARGA
NO MATERIAL SATUAN RATA - RATA
RIA Joko Ismadi RATA2 RATA2/KM /UNIT TOTAL AKHIR
(Rp.) (Rp.) (Rp.) (KM) (Rp.) (Rp/Km) (Rp) (Rp)
A B C D E F G H I J=HXI K=G+J L
ALKES
1 Timbangan Bayi bh 975,000.00 900,000.00 900,000.00 12.00 30.00 0.00 900,000.00 900,000.00
2 Meter Pengukur Lila bh 100,000.00 100,000.00 100,000.00 12.00 30.00 0.00 100,000.00 100,000.00
3 Thermometer Digital bh 170,000.00 150,000.00 150,000.00 12.00 30.00 0.00 150,000.00 150,000.00
4 Timbangan Balita bh 725,000.00 650,000.00 650,000.00 12.00 30.00 0.00 650,000.00 650,000.00
5 Timbangan Dewasa dan Alat Ukur TB bh 3,250,000.00 3,000,000.00 3,000,000.00 12.00 30.00 0.00 3,000,000.00 3,000,000.00
6 Alat Tensi Spidometer bh 850,000.00 850,000.00 850,000.00 12.00 30.00 0.00 850,000.00 850,000.00
7 Ember Cuci tangan + Kran bh 800,000.00 800,000.00 12.00 30.00 0.00 800,000.00 800,000.00
8 Fundus Scop bh 2,000,000.00 2,000,000.00 2,000,000.00 12.00 30.00 0.00 2,000,000.00 2,000,000.00
9 Kain Gorden dan perlengkapan set 275,000.00 250,000.00 250,000.00 12.00 30.00 1.00 250,001.00 250,000.00
SURVEY HARGA SATUAN
PROPINSI : NUSA TENGGARA TIMUR T.A 2017
KABUPATEN : FLORES TIMUR
KECAMATAN : ILEBURA
DESA :
UPAH TENAGA
NO TENAGA KERJA KET.
KERJA (RP/HARI)
1 Tukang Rp -
2 Mandor Rp -
3 Pekerja Rp -
A B C D E F
KAYU
1 Papan 3/20 kls III bowplank Panjang 4 m' Lbr
2 Papan Cor 3/25-4 Panjang 4 m' Lbr
3 Kayu 5/7-4 kls III stelan Panjang 4 m' Btg
4 Kayu/Balok 6/12
Klas I Panjang 4 m' (Bayam) Btg
Klas II Panjang 4 m' (Meranti, Ampupu, Sureng) Btg
5 Papan Gapit Kuda-Kuda (tebal : 3 cm x Lebar : 12 cm)
Klas I Panjang 4 m' (Bayam) Lbr
Klas II Panjang 4 m' (Meranti, Ampupu, Sureng) Lbr
6 Balok kayu 5/10 klas II
Klas I Panjang 4 m' (Bayam) Btg
Klas II Panjang 4 m' (Meranti, Ampupu, Sureng) Btg
7 Papan Listplank
Klas I Panjang 4 m' Lbr
Klas II Panjang 4 m' Lbr
Gipsum/Press Panjang 4 m' Lbr
8 Usuk 4/6
Klas I Panjang 4 m' (Bayam) Btg
Klas II Panjang 4 m' (Meranti, Ampupu, Sureng) Btg
BATU, PASIR
ukuran 10 x 40 x 20 cm, sisi tajam, keras, tidak
1 Batako pecah Bh
ukuran 5 x 10 x 22 cm, sisi tajam, keras, warna
2 Batu merah Bh
merata
3 Pasir pasang Pasir Kali, Psr Gunung bukan Pasir Laut Reit/M³
4 Pasir urug Pasir Kali, Psr Gunung bukan Pasir Laut Reit/M³
5 Tanah urug Tidak mengandung kotoran plastik, dll Reit/M³
6 Batu Pasang (Batu Belah, Batu Kali, Batu Gunung) Ukuran 15/20 Cm Reit/M³
7 Kerikil uk. 2/3 Batu belah, 3 bidang pecah, keras Reit/M³
11 Meja Biasa
Jati Lokal ukr. Tinggi 0,75 m Unit
Suren panjang 1,25 m Unit
lebar 0,60 m
Rangka kayu kls I 4/5, penutup triplek / Daun Papan Jati
Rangka kayu Jati 4/5, penutup triplek / Daun Papan Jati
12 Lemari Arsip
Jati Lokal ukr. Pjg 1,20, lbr 0,40 tinggi 1,50 m Unit
Suren Rak atas kaca dorong 3 mm Unit
* Rangka kayu kls I Bayam 4/5, penutup triplek 2,8 mm,
2 daun pintu Jati
* Rangka kayu Jati 4/5, penutup triplek 2,8 mm, 2 daun
pintu Jati
* Rangka kayu Sureng 4/5, penutup triplek 2,8 mm, 2
daun pintu Mahoni
TOKO / FABRIKASI
1 Semen 40 kg
Bosowa Zak
Tonasa Zak
Gresik Zak
2 Besi polos Ø 12 mm Asli ( SNI ) Lonjor
3 Besi polos Ø 10 mm Asli ( SNI ) Lonjor
4 Besi polos Ø 8 mm Asli ( SNI ) Lonjor
5 Besi polos Ø 6 mm Asli ( SNI ) Lonjor
6 Kawat beton Kg
7 Seng Gel. BJLS 0,30
Warna Biru, Merah Hati Ayam Lbr
Polos Lbr
8 Paku seng Kg
9 Seng plat 0,30 m
10 Paku 16 Kg
11 Paku 12 (Paku Putih) Kg
12 Paku 12 (Biasa) Kg
13 Paku 10 biasa Kg
14 Paku 7 biasa Kg
15 Paku 5 biasa Kg
16 Plat Strip Tebal 4 mm - Pjg 60 cm Bh
17 Plat Strip Tebal 4 mm - Pjg 40 cm Bh
18 Plat Strip Tebal 4 mm - Pjg 20 cm Bh
18 Beugel U bulat 3 - 60 cm Bh
19 Mor Baut ø 12 mm - Panjang 16 cm Bh
20 Mor Baut ø 12 mm - Panjang 30 cm Bh
21 Baut Angkur ø 14 mm - Pjg 25 cm Bh
22 Ring/Cincin Baut Bh
23 Engsel Pintu Merk Hona Bh
Merk Cobra Bh
Merk ................................. Bh
24 Engsel Jendela Merk Hona Bh
Merk Cobra Bh
Merk ................................... Bh
25 Grendel Pintu Merk Medico Bh
Merk MDC 2" Bh
Merk ................................. Bh
39 Cat dinding
5 ( Lima ) Matex/Aries/............. Kg
20 ( Dua Puluh ) Matex/Aries/............. Kg
40 Cat Kayu
5 ( Lima ) Emco/Avian/Dexro Lux Kg
1 ( Satu ) Emco/Avian/Dexro Lux Kg
41 Meni Kayu
Pedang Ltr
Pedang Ltr
42 Minyak Cat / Tinner Spesial Ltr
43 Dumpul Pedang Kg
44 Kapur Kg
45 Plamir Arco/Master Waber Kg
46 Plamir Arco/Master Waber Kg
47 Neon Spiral, Jari
Lampu Phillips 5 watt Philips Bh
Lampu Phillips 8 watt Philips Bh
Lampu Phillips 14 watt Philips Bh
Lampu Phillips 18 watt Philips Bh
Lampu Phillips 23 watt Philips Bh
48 Saklar Ganda Broco Bh
49 Saklar Tunggal Broco Bh
50 Stop Kontak Broco Bh
51 Embol Dos Broco Bh
52 Vitting Lampu Broco Bh
53 Pipa PVC Ø 4'' Maspion btg
54 Soket PVC 4'' 135° Maspion Bh
55 Pipa PVC Ø 2'' Maspion btg
56 Soket PVC 2'' 135° Maspion Bh
57 Lem Paralon Bh
58 Socket PVC Ø 4" Maspion Bh
59 Socket PVC Ø 2" Maspion Bh
60 Kloset Jongkok Bh
61 Profil Tank
2200 Ltr Bh
1100 Ltr Bh
62 Floor drain Bh
PERALATAN
1 Pick Well Bh
2 Cangkul Bh
3 Sekop Bh
4 Ember Cor Bh
5 Ember Air Sedang Anti Pecah
6 Kuas biasa
4" (10 cm) Medico Bh
3" (7cm) Medico Bh
2" (5 cm) Medico Bh
7 Senduk Plamir Besar Bh
Kecil Bh
8 Kuas roll Bh
7 Kawat Ayak m'
8 Benang Profil 2 mm Roll
9 Terpal 4 x 6 Bh
10 Gerobak Dorong Arco Unit
11 Drom Plastik 200 Ltr Bh
LAIN - LAIN
( _______________________________ ) ( ____________________________ )
ANALISA HARGA SATUAN S.N.I
NO. URAIAN KOEF SAT HARGA SAT matrial HARGA SAT upah JUMLAH matrial JUMLAH upah TOTAL harga
A B C D E F G=(CXE) H = (C X F ) I=(G+H)
I PEKERJAAN PERSIAPAN
ANALISA 001 1 m' Pagar Sementara dari Kayu tinggi 2 m 0.00 38,691.56 38,691.56
Bahan
Dolken Kayu Ø 8 - 10/400 cm 1.250 btg Rp - Rp -
Semen Portland 2.500 Kg Rp - Rp -
Pasir Beton 0.005 m3 Rp - Rp -
Koral Beton 0.009 m3 Rp - Rp -
Kaso 5 / 7 ( albasiah ) 0.072 m3 Rp - Rp -
Paku Biasa 2" - 5" 0.060 Kg Rp - Rp -
Residu 0.400 Lt Rp - Rp -
Tenaga
Tukang Kayu 0.200 Oh Rp 65,734.00 Rp 13,146.80
Perkerja 0.400 Oh Rp 55,798.00 Rp 22,319.20
Kepala Tukang 0.020 Oh Rp 75,671.00 Rp 1,513.42
Mandor 0.020 Oh Rp 85,607.00 Rp 1,712.14
ANALISA 002 1 m' Pagar Sementara dari Seng Gelombang tinggi 2 m 0.00 38,691.56 38,691.56
Bahan
Dolken Kayu Ø 8 - 10/400 cm 1.250 btg Rp - 0.00
Semen Portland 2.500 Kg Rp - 0.00
Pasir Beton 1.200 m3 Rp - 0.00
Koral Beton 0.009 m3 Rp - 0.00
Kaso 5 / 7 ( albasiah ) 0.072 m3 Rp - 0.00
Paku Biasa 2" - 5" 0.060 Kg Rp - 0.00
Meni Besi 0.450 Lt Rp - 0.00
Tenaga
Tukang Kayu 0.200 Oh Rp 65,734.00 Rp 13,146.80
Perkerja 0.400 Oh Rp 55,798.00 Rp 22,319.20
Kepala Tukang 0.020 Oh Rp 75,671.00 Rp 1,513.42
Mandor 0.020 Oh Rp 85,607.00 Rp 1,712.14
ANALISA 003 1 m' Pagar Sementara dari Kawat Duri tinggi 1.8 m 0.00 33,111.76 33,111.76
Bahan
Dolken Kayu Ø 8 - 10/400 cm 1.000 btg Rp - 0.00
Semen Portland 2.000 Kg Rp - 0.00
Kawat Duri 25.000 Kg Rp - 0.00
Pasir Beton 0.005 m3 Rp - 0.00
Koral Beton 0.009 m3 Rp - 0.00
Paku Biasa 2" - 5" 0.060 Kg Rp - 0.00
Tenaga
Tukang Kayu 0.200 Oh Rp 65,734.00 13,147
Perkerja 0.300 Oh Rp 55,798.00 16,739
Kepala Tukang 0.020 Oh Rp 75,671.00 1,513
Mandor 0.020 Oh Rp 85,607.00 1,712
ANALISA 004 1 m' Pek. Pengukuran kembali (site) & Pemasangan Bowplank 0.00 13,337.95 13,337.95
Bahan
Kayu Kaso 5 / 7 (borneo) 0.012 m3 Rp - 0.00
Paku Biasa 2" - 5" 0.020 Kg Rp - 0.00
Kayu Papan 3 / 20 borneo 0.007 m3 Rp - 0.00
Tenaga
Tukang Kayu 0.100 Oh Rp 65,734.00 6,573
Perkerja 0.100 Oh Rp 55,798.00 5,580
Kepala Tukang 0.010 Oh Rp 75,671.00 757
Mandor 0.005 Oh Rp 85,607.00 428
ANALISA 005 1 m² Pek. Kantor Direksi Keet , dengan lantai plesteran 0.00 0.00 0.00
Bahan
Dolken Kayu Ø 8 - 10/400 cm 1.250 btg Rp - 0.00
Kayu Balok Borneo 0.180 m3 Rp - 0.00
Paku 0.850 Kg Rp - 0.00
Besi Strip 1.100 Kg Rp - 0.00
Semen Portland 35.000 Kg Rp - 0.00
Pasir Pasang 0.150 m3 Rp - 0.00
Pasir Beton 0.100 m3 Rp - 0.00
Koral Beton 0.150 m3 Rp - 0.00
Bata merah kelas I 30.000 bh Rp - 0.00
Seng Plat 0.250 lbr Rp - 0.00
Jendela Nako 2.000 bh Rp - 0.00
Kaca Polos 0.080 m2 Rp - 0.00
Kunci Tanam 0.150 bh Rp - 0.00
Plywood 4 mm 0.060 lbr Rp - 0.00
Tenaga
Tukang Kayu 2.000 Oh Rp - -
Tukang Batu 1.000 Oh Rp - -
Perkerja 2.000 Oh Rp - -
Kepala Tukang 0.300 Oh Rp - -
Mandor 0.050 Oh Rp - -
ANALISA 006 1 m² Pembuatan Gudang Semen dan Alat - alat 0.00 0.00 0.00
Bahan
Dolken Kayu Ø 8 - 10/400 cm 1.700 btg Rp - 0.00
Kayu Balok Borneo 0.210 m3 Rp - 0.00
Paku 0.300 Kg Rp - 0.00
Semen Portland 10.500 Kg Rp - 0.00
Pasir Beton 0.030 m3 Rp - 0.00
Koral Beton 0.050 m3 Rp - 0.00
Seng Gelombang BJLS 32 1.500 lbr Rp - 0.00
Tenaga
Tukang Kayu 2.000 Oh Rp - -
Perkerja 1.000 Oh Rp - -
Kepala Tukang 0.200 Oh Rp - -
Mandor 0.050 Oh Rp - -
ANALISA 007 1 m² Pembuatan Rumah Jaga / Konstruksi Kayu 0.00 0.00 0.00
Bahan
Dolken Kayu Ø 8 - 10/400 cm 3.000 btg Rp - 0.00
Kayu Balok Borneo 0.276 m3 Rp - 0.00
Paku 0.700 Kg Rp - 0.00
Seng Gelombang BJLS 32 1.500 lbr Rp - 0.00
Tenaga
Tukang Kayu 1.500 Oh Rp - -
Perkerja 1.000 Oh Rp - -
Kepala Tukang 0.150 Oh Rp - -
Mandor 0.050 Oh Rp - -
ANALISA 014 1 m³ Bongkaran Dinding Tembok Bata Merah 0.00 185,157.50 185,157.50
Tenaga
Perkerja 6.667 Oh 27,500.00 183,343
Mandor 0.033 Oh 55,000.00 1,815
II PEKERJAAN TANAH
ANALISA 015 1 m3 Pek. Galian Tanah Biasa Max Kedalaman 1 m' 0.00 13,200.00 13,200.00
Tenaga
Perkerja 0.400 Oh 27,500.00 11,000
Tukang Gali Oh 33,000.00 -
Kepala Tukang Oh 44,000.00 -
Mandor 0.040 Oh 55,000.00 2,200
ANALISA 016 1 m3 Pek. Galian Tanah Biasa Max Kedalaman 2 m' 0.00 17,297.50 17,297.50
Tenaga
Perkerja 0.525 Oh 27,500.00 14,438
Tukang Gali Oh 33,000.00 -
Kepala Tukang Oh 44,000.00 -
Mandor 0.052 Oh 55,000.00 2,860
ANALISA 017 1 m3 Pek. Galian Tanah Biasa Max Kedalaman 3 m' 0.00 #VALUE! #VALUE!
Tenaga
Perkerja 0.735 Oh 27,500.00 20,213
Tukang Gali - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.073 Oh 55,000.00 4,015
ANALISA 018 1 m3 Pek. Galian Tanah Keras Max Kedalaman 1 m' 0.00 #VALUE! #VALUE!
Tenaga
Perkerja 0.625 Oh 27,500.00 17,188
Tukang Gali - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.062 Oh 55,000.00 3,410
ANALISA 019 1 m3 Pek. Galian Tanah Cadas Max Kedalaman 1 m' 0.00 #VALUE! #VALUE!
Tenaga
Perkerja 1.250 Oh 27,500.00 34,375
Tukang Gali - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.125 Oh 55,000.00 6,875
ANALISA 020 1 m3 Pek. Galian Tanah Lumpur Max Kedalaman 1 m' 0.00 #VALUE! #VALUE!
Tenaga
Perkerja 0.823 Oh 27,500.00 22,633
Tukang Gali - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.083 Oh 55,000.00 4,565
IV PEKERJAAN DINDING
ANALISA 030 1 m2 Pasangan Bata Merah 1Pc : 3Ps 1 Bata 140,510.00 27,555.00 168,065.00
Bahan
Bata merah kelas I 140.000 bh 605.00 84,700.00
Semen Portland 32.950 Kg 1,100.00 36,245.00
Pasir Pasang 0.091 m3 215,000.00 19,565.00
Tenaga
Perkerja 0.650 Oh 27,500.00 17,875
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.030 Oh 55,000.00 1,650
ANALISA 031 1 m2 Pasangan Bata Merah 1Pc : 5Ps 1 Bata 131,050.00 27,555.00 158,605.00
Bahan
Bata merah kelas I 140.000 bh 605.00 84,700.00
Semen Portland 22.200 Kg 1,100.00 24,420.00
Pasir Pasang 0.102 m3 215,000.00 21,930.00
Tenaga
Perkerja 0.650 Oh 27,500.00 17,875
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.030 Oh 55,000.00 1,650
ANALISA 032 1 m2 Pasangan Bata Merah 1Pc : 3Ps 1/2 Bata 66,757.00 13,640.00 80,397.00
Bahan
Bata merah kelas I 70.000 bh 605.00 42,350.00
Semen Portland 14.370 Kg 1,100.00 15,807.00
Pasir Pasang 0.040 m3 215,000.00 8,600.00
Tenaga
Perkerja 0.320 Oh 27,500.00 8,800
Tukang Batu 0.100 Oh 35,750.00 3,575
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.015 Oh 55,000.00 825
ANALISA 033 1 m2 Pasangan Bata Merah 1Pc : 5Ps 1/2 Bata 62,673.00 13,640.00 76,313.00
Bahan
Bata merah kelas I 70.000 bh 605.00 42,350.00
Semen Portland 9.680 Kg 1,100.00 10,648.00 0.242
Pasir Pasang 0.045 m3 215,000.00 9,675.00
Tenaga
Perkerja 0.320 Oh 27,500.00 8,800
Tukang Batu 0.100 Oh 35,750.00 3,575
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.015 Oh 55,000.00 825
V PEKERJAAN PELESTERAN
ANALISA 032 1 m2 Plesteran Dinding 1Pc : 3Ps 11,213.00 12,072.50 23,285.50
Bahan
Semen Portland 6.480 Kg 1,100.00 7,128.00
Pasir Pasang 0.019 m3 215,000.00 4,085.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.010 Oh 55,000.00 550
ANALISA 034 1 m2 Plesteran Dinding 1Pc : 0. 5Kp : 3 Ps, tebal 15 mm 8,075.00 12,072.50 20,147.50
Bahan
Semen Portland 4.320 Kg 1,100.00 4,752.00
Kapur Padam 0.003 m3 176,000.00 528.00
Pasir Pasang 0.013 m3 215,000.00 2,795.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.010 Oh 55,000.00 550
ANALISA 035 1 m2 Plesteran Dinding 1Pc : 3Kp : 10Ps, tebal 15 mm 6,090.00 12,072.50 18,162.50
Bahan
Semen Portland 1.840 Kg 1,100.00 2,024.00
Kapur Padam 0.006 m3 176,000.00 1,056.00
Pasir Pasang 0.014 m3 215,000.00 3,010.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.010 Oh 55,000.00 550
ANALISA 036 1 m2 Plesteran 0.5Pc : 1Kp : 4Ps, tebal 15 mm 8,265.00 12,072.50 20,337.50
Bahan
Semen Portland 3.000 Kg 1,100.00 3,300.00
Kapur Padam 0.005 m3 176,000.00 880.00
Pasir Pasang 0.019 m3 215,000.00 4,085.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.010 Oh 55,000.00 550
ANALISA 055 1 m2 Pelesteran Beton 1Pc : 2Ps, tebal 15 mm 14,100.00 15,895.00 29,995.00
Bahan
Semen Portland 9.300 Kg 1,100.00 10,230.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Tenaga
Perkerja 0.260 Oh 27,500.00 7,150
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.013 Oh 55,000.00 715
ANALISA 056 1 m2 Pelesteran Beton 1Pc : 3Ps, tebal 15 mm 12,292.00 15,895.00 28,187.00
Bahan
Semen Portland 7.070 Kg 1,100.00 7,777.00
Pasir Pasang 0.021 m3 215,000.00 4,515.00
Tenaga
Perkerja 0.260 Oh 27,500.00 7,150
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.013 Oh 55,000.00 715
ANALISA 058 1 m2 Pelesteran Granito 1Pc Warna : 2 Granito, tebal 10 mm 330,190.08 2,453.00 332,643.08
Bahan
PC Warna 0.144 Kg 1,320.00 190.08
Batu Granito 15.000 Kg 22,000.00 330,000.00
Tenaga
Perkerja 0.050 Oh 27,500.00 1,375
Tukang Batu 0.020 Oh 35,750.00 715
Kepala Tukang 0.002 Oh 44,000.00 88
Mandor 0.005 Oh 55,000.00 275
ANALISA 059 1 m2 Pelesteran Teraso 1Pc Warna : 2 Batu Teraso, tebal 10 mm 202,980.80 21,780.00 224,760.80
Bahan
PC Warna 0.440 Kg 1,320.00 580.80
Batu Teraso 11.500 Kg 17,600.00 202,400.00
Tenaga
Perkerja 0.450 Oh 27,500.00 12,375
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.025 Oh 55,000.00 1,375
1m³ Pasang Kusen Pintu dan Jendela Kayu Borneo 2,178,000.00 962,500.00 3,140,500.00
Bahan
Kayu Balok Borneo 1.200 m3 1,815,000.00 2,178,000.00
Tenaga
Perkerja 6.000 Oh 27,500.00 165,000
Tukang Kayu 18.000 Oh 38,500.00 693,000
Kepala Tukang 2.000 Oh 44,000.00 88,000
Mandor 0.300 Oh 55,000.00 16,500
1m³ Pasang Kusen Pintu dan Jendela Kayu Damar Laut 2,442,000.00 962,500.00 3,404,500.00
Bahan
Kayu Balok Damar Laut 1.200 m3 2,035,000.00 2,442,000.00
Tenaga
Perkerja 6.000 Oh 27,500.00 165,000
Tukang Kayu 18.000 Oh 38,500.00 693,000
Kepala Tukang 2.000 Oh 44,000.00 88,000
Mandor 0.300 Oh 55,000.00 16,500
1m² Pasang Pintu dan Jendela Kaca Kayu Jati 962,500.00 110,000.00 1,072,500.00
Bahan
Papan Kayu Jati 0.035 m3 27,500,000.00 962,500.00
Tenaga
Perkerja 0.800 Oh 27,500.00 22,000
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.040 Oh 55,000.00 2,200
1m² Pasang Pintu dan Jendela Kaca Kayu Kamper 71,225.00 110,000.00 181,225.00
Bahan
Papan Kayu Kamper 0.035 m3 2,035,000.00 71,225.00
Tenaga
Perkerja 0.800 Oh 27,500.00 22,000
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.040 Oh 55,000.00 2,200
1m² Pasang Pintu dan Jendela Kaca Kayu Borneo 71,225.00 110,000.00 181,225.00
Bahan
Papan Kayu Borneo 0.035 m3 2,035,000.00 71,225.00
Tenaga
Perkerja 0.800 Oh 27,500.00 22,000
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.040 Oh 55,000.00 2,200
1m² Pasang Pintu dan Jendela Jalusi Kayu Borneo 130,240.00 172,700.00 302,940.00
Bahan
Papan Kayu Borneo 0.064 m3 2,035,000.00 130,240.00
Tenaga
Perkerja 1.000 Oh 27,500.00 27,500
Tukang Kayu 3.000 Oh 38,500.00 115,500
Kepala Tukang 0.300 Oh 44,000.00 13,200
Mandor 0.300 Oh 55,000.00 16,500
1m² Pasang Pintu dan Jendela Jalusi Kayu Kamper 130,240.00 183,700.00 313,940.00
Bahan
Papan Kayu Borneo 0.064 m3 2,035,000.00 130,240.00
Tenaga
Perkerja 1.000 Oh 27,500.00 27,500
Tukang Kayu 3.000 Oh 38,500.00 115,500
Kepala Tukang 0.300 Oh 44,000.00 13,200
Mandor 0.500 Oh 55,000.00 27,500
1m² Pasang Pintu Plywood rangkap, rangka kayu Jati 585,893.00 103,950.00 689,843.00
Bahan
Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00
Paku Biasa ½" - 1" 0.030 Kg 34,100.00 1,023.00
Lem Kayu 0.300 Lt 9,900.00 2,970.00
Plywood 4 mm 1.000 Lbr 42,900.00 42,900.00
Tenaga
Perkerja 0.600 Oh 27,500.00 16,500
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.030 Oh 55,000.00 1,650
1m² Pasang Pintu Plywood rangkap, rangka kayu Kamper 585,893.00 103,950.00 689,843.00
Bahan
Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00
Paku Biasa ½" - 1" 0.030 Kg 34,100.00 1,023.00
Lem Kayu 0.300 Lt 9,900.00 2,970.00
Plywood 4 mm 1.000 Lbr 42,900.00 42,900.00
Tenaga
Perkerja 0.600 Oh 27,500.00 16,500
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.030 Oh 55,000.00 1,650
1m² Pasang Jalusi Mati Kusen Kayu Jati 1,655,115.00 100,925.00 1,756,040.00
Bahan
Papan Kayu Jati 0.0600 m3 27,500,000.00 1,650,000.00
Paku Biasa ½" - 1" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.500 Oh 27,500.00 13,750
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.025 Oh 55,000.00 1,375
1m² Pasang Jalusi Mati Kusen Kayu Kamper 1,655,115.00 100,925.00 1,756,040.00
Bahan
Papan Kayu Jati 0.0600 m3 27,500,000.00 1,650,000.00
Paku Biasa ½" - 1" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.500 Oh 27,500.00 13,750
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.025 Oh 55,000.00 1,375
1m² Pasang Pintu Plywood Rangkap, rangka Kayu Borneo 86,779.00 103,950.00 190,729.00
Bahan
Papan Kayu Borneo 0.0196 m3 2,035,000.00 39,886.00
Paku Biasa ½" - 1" 0.030 Kg 34,100.00 1,023.00
Lem Kayu 0.300 Lt 9,900.00 2,970.00
Plywood 4 mm 1.000 lbr 42,900.00 42,900.00
Tenaga
Perkerja 0.600 Oh 27,500.00 16,500
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.030 Oh 55,000.00 1,650
1m² Pasang Pintu Teakwood Rangkap, rangka Kayu Jati 595,100.00 103,950.00 699,050.00
Bahan
Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00
Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00
Lem Kayu 0.300 Lt 9,900.00 2,970.00
Plywood 4 mm 1.000 lbr 42,900.00 42,900.00
Tenaga
Perkerja 0.600 Oh 27,500.00 16,500
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.030 Oh 55,000.00 1,650
1m² Pasang Pintu Teakwood Rangkap, rangka Kayu Kamper 595,100.00 103,950.00 699,050.00
Bahan
Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00
Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00
Lem Kayu 0.300 Lt 9,900.00 2,970.00
Plywood 4 mm 1.000 lbr 42,900.00 42,900.00
Tenaga
Perkerja 0.600 Oh 27,500.00 16,500
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.030 Oh 55,000.00 1,650
1m² Pasang Pintu Plywood & Formika, rangka Kayu Jati 633,050.00 131,450.00 764,500.00
Bahan
Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00
Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00
Lem Kayu 0.800 Lt 9,900.00 7,920.00
Plywood 4 mm 1.000 lbr 42,900.00 42,900.00
Formika 4' x 3' 0.500 lbr 66,000.00 33,000.00
Tenaga
Perkerja 0.800 Oh 27,500.00 22,000
Tukang Kayu 2.500 Oh 38,500.00 96,250
Kepala Tukang 0.250 Oh 44,000.00 11,000
Mandor 0.040 Oh 55,000.00 2,200
1m² Pasang Pintu Plywood & Formika, rangka Kayu Kamper 133,936.00 131,450.00 265,386.00
Bahan
Papan Kayu Kamper 0.0196 m3 2,035,000.00 39,886.00
Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00
Lem Kayu 0.800 Lt 9,900.00 7,920.00
Plywood 4 mm 1.000 lbr 42,900.00 42,900.00
Formika 4' x 3' 0.500 lbr 66,000.00 33,000.00
Tenaga
Perkerja 0.800 Oh 27,500.00 22,000
Tukang Kayu 2.500 Oh 38,500.00 96,250
Kepala Tukang 0.250 Oh 44,000.00 11,000
Mandor 0.040 Oh 55,000.00 2,200
1m² Pasang Pintu Teakwood & Formika, rangka Kayu Jati 633,050.00 131,450.00 764,500.00
Bahan
Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00
Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00
Lem Kayu 0.800 Lt 9,900.00 7,920.00
Plywood 4 mm 1.000 lbr 42,900.00 42,900.00
Formika 4' x 3' 0.500 lbr 66,000.00 33,000.00
Tenaga
Perkerja 0.800 Oh 27,500.00 22,000
Tukang Kayu 2.500 Oh 38,500.00 96,250
Kepala Tukang 0.250 Oh 44,000.00 11,000
Mandor 0.040 Oh 55,000.00 2,200
1m² Pasang Pintu Teakwood & Formika, rangka Kayu Kamper ( divernis ) 611,600.00 131,450.00 743,050.00
Bahan
Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00
Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00
Lem Kayu 0.800 Lt 9,900.00 7,920.00
Plywood 4 mm 0.500 lbr 42,900.00 21,450.00
Formika 4' x 3' 0.500 lbr 66,000.00 33,000.00
Tenaga
Perkerja 0.800 Oh 27,500.00 22,000
Tukang Kayu 2.500 Oh 38,500.00 96,250
Kepala Tukang 0.250 Oh 44,000.00 11,000
Mandor 0.040 Oh 55,000.00 2,200
1m² Pasang Pintu Formika Double, rangka Kayu Jati 670,010.00 141,790.00 811,800.00
Bahan
Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00
Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00
Lem Kayu 1.200 Lt 9,900.00 11,880.00
Plywood 4 mm 1.000 lbr 42,900.00 42,900.00
Formika 4' x 3' 1.000 lbr 66,000.00 66,000.00
Tenaga
Perkerja 1.000 Oh 27,500.00 27,500
Tukang Kayu 2.600 Oh 38,500.00 100,100
Kepala Tukang 0.260 Oh 44,000.00 11,440
Mandor 0.050 Oh 55,000.00 2,750
1m² Pasang Pintu Formika Double, rangka Kayu Kamper 170,896.00 141,790.00 312,686.00
Bahan
Papan Kayu Kamper 0.0196 m3 2,035,000.00 39,886.00
Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00
Lem Kayu 1.200 Lt 9,900.00 11,880.00
Plywood 4 mm 1.000 lbr 42,900.00 42,900.00
Formika 4' x 3' 1.000 lbr 66,000.00 66,000.00
Tenaga
Perkerja 1.000 Oh 27,500.00 27,500
Tukang Kayu 2.600 Oh 38,500.00 100,100
Kepala Tukang 0.260 Oh 44,000.00 11,440
Mandor 0.050 Oh 55,000.00 2,750
1m3 Pasang Konstruksi Kuda - kuda Kayu Jati 30,450,530.00 635,800.00 31,086,330.00
Bahan
Balok Kayu Jati 1.100 m3 27,500,000.00 30,250,000.00
Besi Strip 15.000 11,550.00 173,250.00
Paku Biasa 2" - 5" 0.800 Kg 34,100.00 27,280.00
Tenaga
Perkerja 4.000 Oh 27,500.00 110,000
Tukang Kayu 12.000 Oh 38,500.00 462,000
Kepala Tukang 1.200 Oh 44,000.00 52,800
Mandor 0.200 Oh 55,000.00 11,000
1m3 Pasang Konstruksi Kuda - kuda Kayu Kamper 2,015,530.00 635,800.00 2,651,330.00
Bahan
Balok Kayu Kamper 1.100 m3 1,650,000.00 1,815,000.00
Besi Strip 15.000 Kg 11,550.00 173,250.00
Paku Biasa 2" - 5" 0.800 Kg 34,100.00 27,280.00
Tenaga
Perkerja 4.000 Oh 27,500.00 110,000
Tukang Kayu 12.000 Oh 38,500.00 462,000
Kepala Tukang 1.200 Oh 44,000.00 52,800
Mandor 0.200 Oh 55,000.00 11,000
1m3 Pasang Konstruksi Kuda - kuda Kayu Borneo 1,960,530.00 635,800.00 2,596,330.00
Bahan
Balok Kayu Borneo 1.100 m3 1,600,000.00 1,760,000.00
Besi Strip 15.000 Kg 11,550.00 173,250.00
Paku Biasa 2" - 5" 0.800 Kg 34,100.00 27,280.00
Tenaga
Perkerja 4.000 Oh 27,500.00 110,000
Tukang Kayu 12.000 Oh 38,500.00 462,000
Kepala Tukang 1.200 Oh 44,000.00 52,800
Mandor 0.200 Oh 55,000.00 11,000
1m3 Pasang Konstruksi Kuda - kuda Kayu Kruing 1,834,030.00 635,800.00 2,469,830.00
Bahan
Balok Kayu Kruing 1.100 m3 1,485,000.00 1,633,500.00
Besi Strip 15.000 Kg 11,550.00 173,250.00
Paku Biasa 2" - 5" 0.800 Kg 34,100.00 27,280.00
Tenaga
Perkerja 4.000 Oh 27,500.00 110,000
Tukang Kayu 12.000 Oh 38,500.00 462,000
Kepala Tukang 1.200 Oh 44,000.00 52,800
Mandor 0.200 Oh 55,000.00 11,000
1m² Pasang Kaso + Reng Genteng Kodok Kayu Kamper 24,915.00 7,315.00 32,230.00
Bahan
Balok Kayu Kamper 0.012 m3 1,650,000.00 19,800.00
Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.005 Oh 55,000.00 275
1m² Pasang Kaso + Reng Genteng Kodok Kayu Borneo 24,315.00 7,315.00 31,630.00
Bahan
Balok Kayu Borneo 0.012 m3 1,600,000.00 19,200.00
Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.005 Oh 55,000.00 275
1m² Pasang Kaso + Reng Genteng Monier Kayu Jati 390,115.00 7,315.00 397,430.00
Bahan
Balok Kayu Jati 0.014 m3 27,500,000.00 385,000.00
Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.005 Oh 55,000.00 275
1m² Pasang Kaso + Reng Genteng Monier Kayu Kamper 28,215.00 7,315.00 35,530.00
Bahan
Balok Kayu Kamper 0.014 m3 1,650,000.00 23,100.00
Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.005 Oh 55,000.00 275
1m² Pasang Kaso + Reng Genteng Beton Kayu Borneo 27,515.00 7,315.00 34,830.00
Bahan
Balok Kayu Borneo 0.014 m3 1,600,000.00 22,400.00
Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.005 Oh 55,000.00 275
1m² Pasang Kaso + Reng Atap Sirap Kayu Kamper 279,070.00 8,778.00 287,848.00
Bahan
Balok Kayu Kamper 0.165 m3 1,650,000.00 272,250.00
Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00
Tenaga
Perkerja 0.120 Oh 27,500.00 3,300
Tukang Kayu 0.120 Oh 38,500.00 4,620
Kepala Tukang 0.012 Oh 44,000.00 528
Mandor 0.006 Oh 55,000.00 330
1m² Pasang Kaso + Reng Atap Sirap Kayu Borneo 279,070.00 8,778.00 287,848.00
Bahan
Balok Kayu Kamper 0.165 m3 1,650,000.00 272,250.00
Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00
Tenaga
Perkerja 0.120 Oh 27,500.00 3,300
Tukang Kayu 0.120 Oh 38,500.00 4,620
Kepala Tukang 0.012 Oh 44,000.00 528
Mandor 0.006 Oh 55,000.00 330
1m² Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Jati 333,410.00 18,975.00 352,385.00
Bahan
Balok Kayu Jati 0.012 m3 27,500,000.00 330,000.00
Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.250 Oh 38,500.00 9,625
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.075 Oh 55,000.00 4,125
1m' Pasang papan ruiter ( 3 x 20 )cm Kayu Borneo 16,357.00 11,825.00 28,182.00
Bahan
Kayu Papan 3 / 20 borneo 0.0072 m3 2,035,000.00 14,652.00
Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.200 Oh 38,500.00 7,700
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.005 Oh 55,000.00 275
1m² Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Kamper 23,210.00 18,975.00 42,185.00
Bahan
Balok Kayu Kamper 0.012 m3 1,650,000.00 19,800.00
Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.250 Oh 38,500.00 9,625
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.075 Oh 55,000.00 4,125
1m² Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Borneo 23,210.00 18,975.00 42,185.00
Bahan
Balok Kayu Kamper 0.012 m3 1,650,000.00 19,800.00
Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.250 Oh 38,500.00 9,625
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.075 Oh 55,000.00 4,125
1m² Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Jati 637,615.00 18,920.00 656,535.00
Bahan
Balok Kayu Jati 0.023 m3 27,500,000.00 632,500.00
Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Kayu 0.300 Oh 38,500.00 11,550
Kepala Tukang 0.030 Oh 44,000.00 1,320
Mandor 0.010 Oh 55,000.00 550
1m² Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Kamper 43,065.00 18,920.00 61,985.00
Bahan
Balok Kayu Kamper 0.023 m3 1,650,000.00 37,950.00
Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Kayu 0.300 Oh 38,500.00 11,550
Kepala Tukang 0.030 Oh 44,000.00 1,320
Mandor 0.010 Oh 55,000.00 550
1m² Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Borneo 41,915.00 18,920.00 60,835.00
Bahan
Balok Kayu Borneo 0.023 m3 1,600,000.00 36,800.00
Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Kayu 0.300 Oh 38,500.00 11,550
Kepala Tukang 0.030 Oh 44,000.00 1,320
Mandor 0.010 Oh 55,000.00 550
1m² Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Jati 749,320.00 22,577.50 771,897.50
Bahan
Balok Kayu Jati 0.027 m3 27,500,000.00 742,500.00
Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00
Tenaga
Perkerja 0.250 Oh 27,500.00 6,875
Tukang Kayu 0.350 Oh 38,500.00 13,475
Kepala Tukang 0.035 Oh 44,000.00 1,540
Mandor 0.0125 Oh 55,000.00 688
1m² Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Kamper 51,370.00 22,577.50 73,947.50
Bahan
Balok Kayu Kamper 0.027 m3 1,650,000.00 44,550.00
Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00
Tenaga
Perkerja 0.250 Oh 27,500.00 6,875
Tukang Kayu 0.350 Oh 38,500.00 13,475
Kepala Tukang 0.035 Oh 44,000.00 1,540
Mandor 0.0125 Oh 55,000.00 688
1m² Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Borneo 50,020.00 22,577.50 72,597.50
Bahan
Balok Kayu Borneo 0.027 m3 1,600,000.00 43,200.00
Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00
Tenaga
Perkerja 0.250 Oh 27,500.00 6,875
Tukang Kayu 0.350 Oh 38,500.00 13,475
Kepala Tukang 0.035 Oh 44,000.00 1,540
Mandor 0.0125 Oh 55,000.00 688
1m² Pasang Rangka Dinding Pemisah Kayu Kamper 49,830.00 27,555.00 77,385.00
Bahan
Balok Kayu Kamper 0.0195 m3 1,650,000.00 32,175.00
Papan Kayu Kamper 0.007 m3 2,035,000.00 14,245.00
Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.450 Oh 38,500.00 17,325
Kepala Tukang 0.045 Oh 44,000.00 1,980
Mandor 0.075 Oh 55,000.00 4,125
1m² Pasang Rangka Dinding Pemisah Kayu Borneo 48,855.00 27,555.00 76,410.00
Bahan
Balok Kayu Borneo 0.0195 m3 1,600,000.00 31,200.00
Papan Kayu Borneo 0.007 m3 2,035,000.00 14,245.00
Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.450 Oh 38,500.00 17,325
Kepala Tukang 0.045 Oh 44,000.00 1,980
Mandor 0.075 Oh 55,000.00 4,125
1m² Pasang Dinding Pemisah Teakwood Rangkap, RangkaKayu Kamper 49,830.00 27,555.00 77,385.00
Bahan
Balok Kayu Kamper 0.0195 m3 1,650,000.00 32,175.00
Papan Kayu Kamper 0.007 m3 2,035,000.00 14,245.00
Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.450 Oh 38,500.00 17,325
Kepala Tukang 0.045 Oh 44,000.00 1,980
Mandor 0.075 Oh 55,000.00 4,125
1m² Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper 49,830.00 27,555.00 77,385.00
Bahan
Balok Kayu Kamper 0.0195 m3 1,650,000.00 32,175.00
Papan Kayu Kamper 0.007 m3 2,035,000.00 14,245.00
Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.450 Oh 38,500.00 17,325
Kepala Tukang 0.045 Oh 44,000.00 1,980
Mandor 0.075 Oh 55,000.00 4,125
1m² Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper 98,274.00 31,790.00 130,064.00
Bahan
Balok Kayu Kamper 0.0195 m3 1,650,000.00 32,175.00
Papan Kayu Kamper 0.007 m3 2,035,000.00 14,245.00
Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00
Lem Kayu 0.560 lt 9,900.00 5,544.00
Plywood 4 mm 1.000 lbr 42,900.00 42,900.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Kayu 0.600 Oh 38,500.00 23,100
Kepala Tukang 0.060 Oh 44,000.00 2,640
Mandor 0.010 Oh 55,000.00 550
1m² Pasang Dinding Lambriziring dari papan Kayu jati 201,025.00 95,370.00 296,395.00
Bahan
Papan Kayu Jati 0.007 m3 27,500,000.00 192,500.00
Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00
Paku Skrup 3.5" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.600 Oh 27,500.00 16,500
Tukang Kayu 1.800 Oh 38,500.00 69,300
Kepala Tukang 0.180 Oh 44,000.00 7,920
Mandor 0.030 Oh 55,000.00 1,650
1m² Pasang Plywood tebal 4mm, untuk dinding 18,865.00 3,976.50 22,841.50
Bahan
Plywood 4 mm 0.400 lbr 42,900.00 17,160.00
Paku Biasa ½" - 1" 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.025 Oh 27,500.00 688
Tukang Kayu 0.075 Oh 38,500.00 2,888
Kepala Tukang 0.0075 Oh 44,000.00 330
Mandor 0.0013 Oh 55,000.00 72
PEKERJAAN BETON
1 m2 Membuat Lantai Kerja Beton Tumbuk 1 Pc : 3 Ps : 5 Kr 28,690.00 32,758.00 61,448.00
Bahan
Semen Portland 10.000 Kg 1,100.00 11,000.00 0.25
Pasir Beton 0.026 m3 215,000.00 5,590.00
Koral Beton 0.044 m3 275,000.00 12,100.00
Tenaga
Perkerja 1.150 Oh 27,500.00 31,625
Tukang Batu 0.020 Oh 35,750.00 715
Kepala Tukang 0.002 Oh 44,000.00 88
Mandor 0.006 Oh 55,000.00 330
1 m³ Membuat Beton Kedap Air dengan Strorox - 100 769,140.00 124,052.50 893,192.50
Bahan
Semen Portland 400.000 Kg 1,100.00 440,000.00
Pasir Beton 0.480 m3 215,000.00 103,200.00
Koral Beton 0.800 m3 275,000.00 220,000.00
Strorox - 100 1.200 Kg 4,950.00 5,940.00
Tenaga
Perkerja 2.000 Oh 27,500.00 55,000
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.035 Oh 44,000.00 1,540
Mandor 1.000 Oh 55,000.00 55,000
1 Kg Pembesian dengan Besi Polos atau Besi Ulir 17,646.75 490.05 18,136.80
Bahan
Besi Beton ( Polos / Ulir ) 1.050 Kg 16,500.00 17,325.00
Kawat Beton 0.015 Kg 21,450.00 321.75
Tenaga
Perkerja 0.007 Oh 27,500.00 193
Tukang Besi 0.007 Oh 35,750.00 250
Kepala Tukang 0.0007 Oh 44,000.00 31
Mandor 0.0003 Oh 55,000.00 17
1 m³ Membuat Kolom Penguat Beton Bertulang (11 x 11) cm 69,238.50 4,279.00 73,517.50
Bahan
Kayu Terentang 0.002 m3 1,540,000.00 3,080.00
Paku Biasa 2" - 5" 0.010 Kg 34,100.00 341.00
Besi Beton Polos 3.000 Kg 16,000.00 48,000.00
Kawat Beton 0.450 Kg 21,450.00 9,652.50
Semen Portland 4.000 Kg 1,100.00 4,400.00
Pasir Beton 0.006 m3 215,000.00 1,290.00
Koral Beton 0.009 m3 275,000.00 2,475.00
Tenaga
Perkerja 0.060 Oh 27,500.00 1,650
Tukang Batu 0.020 Oh 35,750.00 715
Tukang Kayu 0.020 Oh 38,500.00 770
Tukang Besi 0.020 Oh 35,750.00 715
Kepala Tukang 0.006 Oh 44,000.00 264
Mandor 0.003 Oh 55,000.00 165
1 m³ Membuat Ring Balok Beton Bertulang (10 x 15) cm 79,087.50 17,712.75 96,800.25
Bahan
Kayu Albasiah 0.003 m3 495,000.00 1,485.00
Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00
Besi Beton Polos 3.600 Kg 16,000.00 57,600.00
Kawat Beton 0.050 Kg 21,450.00 1,072.50
Semen Portland 5.500 Kg 1,100.00 6,050.00
Pasir Beton 0.009 m3 215,000.00 1,935.00
Koral Beton 0.015 m3 275,000.00 4,125.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Batu 0.330 Oh 35,750.00 11,798
Tukang Kayu 0.033 Oh 38,500.00 1,271
Tukang Besi 0.033 Oh 35,750.00 1,180
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.005 Oh 55,000.00 275
1m² Pasang Atap Genteng Palentong Super / Besar 29,040.00 7,139.00 36,179.00
Bahan
Genteng Palentong Super 12.000 bh 2,420.00 29,040.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.060 Oh 38,500.00 2,310
Kepala Tukang 0.006 Oh 44,000.00 264
Mandor 0.008 Oh 55,000.00 440
1m' Pasang Atap Asbes Gelombang ( 2.50 x 0.92 m ) X 5mm 13,992.00 7,529.50 21,521.50
Bahan
Asbes Gelombang 0.500 lbr 19,800.00 9,900.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.075 Oh 38,500.00 2,888
Kepala Tukang 0.008 Oh 44,000.00 352
Mandor 0.008 Oh 55,000.00 440
1m' Pasang Atap Asbes Gelombang ( 2.25 x 0.92 m ) X 5mm 15,972.00 7,529.50 23,501.50
Bahan
Asbes Gelombang 0.600 lbr 19,800.00 11,880.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.075 Oh 38,500.00 2,888
Kepala Tukang 0.008 Oh 44,000.00 352
Mandor 0.008 Oh 55,000.00 440
1m' Pasang Atap Asbes Gelombang ( 2.00 x 0.92 m ) X 5mm 15,972.00 7,238.00 23,210.00
Bahan
Asbes Gelombang 0.600 lbr 19,800.00 11,880.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.070 Oh 38,500.00 2,695
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385
1m' Pasang Atap Asbes Gelombang ( 1.80 x 0.92 m ) X 5mm 18,942.00 7,238.00 26,180.00
Bahan
Asbes Gelombang 0.750 lbr 19,800.00 14,850.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.070 Oh 38,500.00 2,695
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385
1m² Pasang Atap Asbes Gelombang ( 300 x 1.05 m ) X 4mm 11,022.00 7,238.00 18,260.00
Bahan
Asbes Gelombang 0.350 lbr 19,800.00 6,930.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.070 Oh 38,500.00 2,695
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385
1m² Pasang Atap Asbes Gelombang ( 270 x 1.05 m ) X 4mm 12,408.00 7,238.00 19,646.00
Bahan
Asbes Gelombang 0.420 lbr 19,800.00 8,316.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.070 Oh 38,500.00 2,695
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385
1m² Pasang Atap Asbes Gelombang ( 240 x 1.05 m ) X 4mm 12,804.00 7,122.50 19,926.50
Bahan
Asbes Gelombang 0.440 lbr 19,800.00 8,712.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.067 Oh 38,500.00 2,580
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385
1m² Pasang Atap Asbes Gelombang ( 210 x 1.05 m ) X 4mm 14,190.00 7,122.50 21,312.50
Bahan
Asbes Gelombang 0.510 lbr 19,800.00 10,098.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.067 Oh 38,500.00 2,580
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385
1m² Pasang Atap Asbes Gelombang ( 1.5 x 1.05 m ) X 4mm 19,932.00 7,122.50 27,054.50
Bahan
Asbes Gelombang 0.800 lbr 19,800.00 15,840.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.067 Oh 38,500.00 2,580
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385
1m² Pasang Atap Asbes Gelombang ( 3.00 x 1.08 m ) X 6mm 11,418.00 7,122.50 18,540.50
Bahan
Asbes Gelombang 0.370 lbr 19,800.00 7,326.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.067 Oh 38,500.00 2,580
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385
1m² Pasang Atap Asbes Gelombang ( 2.7 x 1.08 m ) X 6mm 11,616.00 7,122.50 18,738.50
Bahan
Asbes Gelombang 0.380 lbr 19,800.00 7,524.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.067 Oh 38,500.00 2,580
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385
1m² Pasang Atap Asbes Gelombang ( 2.4 x 1.08 m ) X 6mm 13,200.00 7,122.50 20,322.50
Bahan
Asbes Gelombang 0.460 lbr 19,800.00 9,108.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.067 Oh 38,500.00 2,580
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385
1m² Pasang Atap Asbes Gelombang ( 2.1 x 1.08 m ) X 6mm 13,794.00 7,122.50 20,916.50
Bahan
Asbes Gelombang 0.490 lbr 19,800.00 9,702.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.067 Oh 38,500.00 2,580
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385
1m² Pasang Atap Asbes Gelombang ( 1.80 x 1.08 m ) X 6mm 15,378.00 7,122.50 22,500.50
Bahan
Asbes Gelombang 0.570 lbr 19,800.00 11,286.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.067 Oh 38,500.00 2,580
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385
1 m² Langit - langit Asbes ( 1.00 x 1.00 )m tebal 3.5 mm 42,691.00 3,910.50 46,601.50
Bahan
Pelat Asbes tebal 4 mm 1.100 lbr 38,500.00 42,350.00
Paku 0.010 Kg 34,100.00 341.00
Tenaga
Perkerja 0.030 Oh 27,500.00 825
Tukang Kayu 0.070 Oh 38,500.00 2,695
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.0015 Oh 55,000.00 83
1 m² Langit - langit Asbes ( 1.00 x 1.00 )m, tebal 3.2mm Rangka Borneo 43,026.00 19,173.00 62,199.00
Bahan
Balok Kayu Borneo 0.012 m3 1,600,000.00 19,200.00
Paku 0.060 Kg 34,100.00 2,046.00
Asbes 1.100 lbr 19,800.00 21,780.00
Tenaga
Perkerja 0.180 Oh 27,500.00 4,950
Tukang Kayu 0.320 Oh 38,500.00 12,320
Kepala Tukang 0.032 Oh 44,000.00 1,408
Mandor 0.0090 Oh 55,000.00 495
1 m² Langit - langit Akustik ( 30 x 60 )cm + Rangka Kayu Borneo 351,466.00 25,025.00 376,491.00
Bahan
Balok Kayu Borneo 0.023 m3 1,600,000.00 36,800.00
Paku 0.060 Kg 34,100.00 2,046.00
Akustik 30 x 60 cm 5.800 lbr 53,900.00 312,620.00
Tenaga
Perkerja 0.260 Oh 27,500.00 7,150
Tukang Kayu 0.400 Oh 38,500.00 15,400
Kepala Tukang 0.040 Oh 44,000.00 1,760
Mandor 0.0130 Oh 55,000.00 715
1 m² Langit - langit Akustik ( 30 x 30 )cm + Rangka Kayu Borneo 614,496.00 29,540.50 644,036.50
Bahan
Balok Kayu Borneo 0.027 m3 1,600,000.00 43,200.00
Paku 0.060 Kg 34,100.00 2,046.00
Akustik 30 x 30 cm 11.500 lbr 49,500.00 569,250.00
Tenaga
Perkerja 0.310 Oh 27,500.00 8,525
Tukang Kayu 0.470 Oh 38,500.00 18,095
Kepala Tukang 0.047 Oh 44,000.00 2,068
Mandor 0.0155 Oh 55,000.00 853
IX PEKERJAAN SANITASI
Memasang 1 buah Kloset Duduk / Monoblok 1,859,000.00 138,919.00 1,997,919.00
Bahan
Kloset Duduk / Monoblok 1.000 bh 1,430,000.00 1,430,000.00
Perlengkapan 30% Dari bahan 429,000.00 429,000.00
Tenaga
Perkerja 3.300 Oh 27,500.00 90,750
Tukang Batu 1.100 Oh 35,750.00 39,325
Kepala Tukang 0.001 Oh 44,000.00 44
Mandor 0.1600 Oh 55,000.00 8,800
Memasang 1 buah Kloset Jongkok Porselen 173,750.00 155,925.00 329,675.00
Bahan
Kloset Jongkok Porselen 1.000 bh 165,000.00 165,000.00
Semen Portland 6.000 Kg 1,100.00 6,600.00
Pasir Pasang 0.010 m3 215,000.00 2,150.00
Tenaga
Perkerja 1.000 Oh 27,500.00 27,500
Tukang Batu 1.500 Oh 35,750.00 53,625
Kepala Tukang 1.500 Oh 44,000.00 66,000
Mandor 0.1600 Oh 55,000.00 8,800
Memasang 1 buah Bak Mandi Teraso, volume 0.30 m³ 140,750.00 93,692.50 234,442.50
Bahan
Bak Teraso 1.000 bh 132,000.00 132,000.00
Semen Portland 6.000 Kg 1,100.00 6,600.00
Pasir Pasang 0.010 m3 215,000.00 2,150.00
Tenaga
Perkerja 2.100 Oh 27,500.00 57,750
Tukang Batu 0.750 Oh 35,750.00 26,813
Kepala Tukang 0.070 Oh 44,000.00 3,080
Mandor 0.1100 Oh 55,000.00 6,050
Memasang 1 buah Bak Mandi Fiberglass, volume 0.30 m³ 233,640.00 175,835.00 409,475.00
Bahan
Bak Fiberglass 1.000 bh 198,000.00 198,000.00
Perlengkapan 18% Harga Bak 35,640.00 35,640.00
Tenaga
Perkerja 1.800 Oh 27,500.00 49,500
Tukang Batu 2.700 Oh 35,750.00 96,525
Kepala Tukang 0.540 Oh 44,000.00 23,760
Mandor 0.1100 Oh 55,000.00 6,050
Memasang 1 buah Bak Mandi Batu bata, volume 0.30 m³ 420,284.00 301,950.00 722,234.00
Bahan
Bata merah kelas I 0.400 m3 605.00 242.00
Semen Portland 120.000 Kg 1,100.00 132,000.00
Pasir Pasang 0.300 m3 215,000.00 64,500.00
Porselen ( 11 x 11 ) cm 360.000 bh 598.95 215,622.00
Semen Nat 6.000 Kg 1,320.00 7,920.00
Tenaga
Perkerja 6.000 Oh 27,500.00 165,000
Tukang Batu 3.000 Oh 35,750.00 107,250
Kepala Tukang 0.300 Oh 44,000.00 13,200
Mandor 0.3000 Oh 55,000.00 16,500
Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa Tanah Ø15 cm 154,111.00 2,992.00 157,103.00
Bahan
Pipa Tanah 1.600 bh 93,500.00 149,600.00
Semen Portland 0.680 Kg 1,100.00 748.00
Pasir Pasang 0.013 m3 215,000.00 2,795.00
Pasir Urug 0.011 m3 88,000.00 968.00
Tenaga
Perkerja 0.060 Oh 27,500.00 1,650
Tukang Batu 0.030 Oh 35,750.00 1,073
Kepala Tukang 0.003 Oh 44,000.00 132
Mandor 0.0025 Oh 55,000.00 138
Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa Tanah Ø 20 cm 154,799.00 4,191.00 158,990.00
Bahan
Pipa Tanah 1.600 bh 93,500.00 149,600.00
Semen Portland 0.870 Kg 1,100.00 957.00
Pasir Pasang 0.014 m3 215,000.00 3,010.00
Pasir Urug 0.014 m3 88,000.00 1,232.00
Tenaga
Perkerja 0.080 Oh 27,500.00 2,200
Tukang Batu 0.040 Oh 35,750.00 1,430
Kepala Tukang 0.004 Oh 44,000.00 176
Mandor 0.0070 Oh 55,000.00 385
Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t = 35cm 121,287.73 125,232.25 246,519.98
Bahan
Bata merah kelas I 0.145 m3 605.00 87.73
Semen Portland 44.000 Kg 1,100.00 48,400.00
Pasir Pasang 0.070 m3 215,000.00 15,050.00
Batu Kerikil 0.070 m3 275,000.00 19,250.00
Besi Beton 1.600 Kg 16,000.00 25,600.00
Pasir Beton 0.060 m3 215,000.00 12,900.00
Tenaga
Perkerja 3.200 Oh 27,500.00 88,000
Tukang Batu 1.015 Oh 35,750.00 36,286
Kepala Tukang 0.0015 Oh 44,000.00 66
Mandor 0.0160 Oh 55,000.00 880
Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50cm 179,251.25 61,932.75 241,184.00
Bahan
Bata merah kelas I 0.250 m3 605.00 151.25
Semen Portland 77.000 Kg 1,100.00 84,700.00
Pasir Pasang 0.130 m3 215,000.00 27,950.00
Batu Kerikil 0.020 m3 275,000.00 5,500.00
Besi Beton 2.600 Kg 16,000.00 41,600.00
Pasir Beton 0.090 m3 215,000.00 19,350.00
Tenaga
Perkerja 1.420 Oh 27,500.00 39,050
Tukang Batu 0.473 Oh 35,750.00 16,910
Kepala Tukang 0.0470 Oh 44,000.00 2,068
Mandor 0.0710 Oh 55,000.00 3,905
Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (60 x 60 )cm, t = 65cm 277,659.46 97,548.00 375,207.46
Bahan
Bata merah kelas I 0.371 m3 605.00 224.46
Semen Portland 114.000 Kg 1,100.00 125,400.00
Pasir Pasang 0.184 m3 215,000.00 39,560.00
Batu Koral 0.033 m3 275,000.00 9,075.00
Besi Beton 4.850 Kg 16,000.00 77,600.00
Pasir Beton 0.120 m3 215,000.00 25,800.00
Tenaga
Perkerja 2.160 Oh 27,500.00 59,400
Tukang Batu 0.720 Oh 35,750.00 25,740
Kepala Tukang 0.0720 Oh 44,000.00 3,168
Mandor 0.1080 Oh 55,000.00 5,940
Tukang Gali 0.1000 Oh 33,000.00 3,300
Tenaga
Perkerja 0.2500 Oh 27,500.00 6,875
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0125 Oh 55,000.00 688
Tenaga
Perkerja 0.2600 Oh 27,500.00 7,150
Tukang Batu 0.125 Oh 35,750.00 4,469
Kepala Tukang 0.0125 Oh 44,000.00 550
Mandor 0.0130 Oh 55,000.00 715
1 m² Pasang Lantai Ubin PC Abu - abu ukuran 20 x 20 cm 55,152.50 13,387.00 68,539.50
Bahan
Ubin Abu -abu 20 x 20 cm 26.500 bh 1,540.00 40,810.00
Semen Portland 10.400 Kg 1,100.00 11,440.00
Pasir Pasang 0.0135 m3 215,000.00 2,902.50
Tenaga
Perkerja 0.2700 Oh 27,500.00 7,425
Tukang Batu 0.130 Oh 35,750.00 4,648
Kepala Tukang 0.0130 Oh 44,000.00 572
Mandor 0.0135 Oh 55,000.00 743
Tenaga
Perkerja 0.2500 Oh 27,500.00 6,875
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0125 Oh 55,000.00 688
Tenaga
Perkerja 0.2500 Oh 27,500.00 6,875
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0125 Oh 55,000.00 688
Tenaga
Perkerja 0.2700 Oh 27,500.00 7,425
Tukang Batu 0.130 Oh 35,750.00 4,648
Kepala Tukang 0.0130 Oh 44,000.00 572
Mandor 0.0135 Oh 55,000.00 743
Tenaga
Perkerja 0.2500 Oh 27,500.00 6,875
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0125 Oh 55,000.00 688
Tenaga
Perkerja 0.2600 Oh 27,500.00 7,150
Tukang Batu 0.125 Oh 35,750.00 4,469
Kepala Tukang 0.0125 Oh 44,000.00 550
Mandor 0.0130 Oh 55,000.00 715
Tenaga
Perkerja 0.2500 Oh 27,500.00 6,875
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0125 Oh 44,000.00 550
Mandor 0.0125 Oh 55,000.00 688
Tenaga
Perkerja 0.2600 Oh 27,500.00 7,150
Tukang Batu 0.125 Oh 35,750.00 4,469
Kepala Tukang 0.0125 Oh 44,000.00 550
Mandor 0.0130 Oh 55,000.00 715
Tenaga
Perkerja 0.2500 Oh 27,500.00 6,875
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0125 Oh 55,000.00 688
Tenaga
Perkerja 0.2500 Oh 27,500.00 6,875
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0125 Oh 55,000.00 688
Tenaga
Perkerja 0.2500 Oh 27,500.00 6,875
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0125 Oh 55,000.00 688
Tenaga
Perkerja 0.6720 Oh 27,500.00 18,480
Tukang Batu 0.224 Oh 35,750.00 8,008
Kepala Tukang 0.0220 Oh 44,000.00 968
Mandor 0.0340 Oh 55,000.00 1,870
Tenaga
Perkerja 0.7000 Oh 27,500.00 19,250
Tukang Batu 0.340 Oh 35,750.00 12,155
Kepala Tukang 0.0340 Oh 44,000.00 1,496
Mandor 0.0350 Oh 55,000.00 1,925
Tenaga
Perkerja 0.0600 Oh 27,500.00 1,650
Tukang Batu 0.030 Oh 35,750.00 1,073
Kepala Tukang 0.0030 Oh 44,000.00 132
Mandor 0.0030 Oh 55,000.00 165
Tenaga
Perkerja 0.0600 Oh 27,500.00 1,650
Tukang Batu 0.030 Oh 35,750.00 1,073
Kepala Tukang 0.0030 Oh 44,000.00 132
Mandor 0.0030 Oh 55,000.00 165
Tenaga
Perkerja 0.0600 Oh 27,500.00 1,650
Tukang Batu 0.030 Oh 35,750.00 1,073
Kepala Tukang 0.0030 Oh 44,000.00 132
Mandor 0.0030 Oh 55,000.00 165
Tenaga
Perkerja 0.0600 Oh 27,500.00 1,650
Tukang Batu 0.030 Oh 35,750.00 1,073
Kepala Tukang 0.0030 Oh 44,000.00 132
Mandor 0.0030 Oh 55,000.00 165
Tenaga
Perkerja 0.0600 Oh 27,500.00 1,650
Tukang Batu 0.030 Oh 35,750.00 1,073
Kepala Tukang 0.0030 Oh 44,000.00 132
Mandor 0.0030 Oh 55,000.00 165
Tenaga
Perkerja 0.0800 Oh 27,500.00 2,200
Tukang Batu 0.040 Oh 35,750.00 1,430
Kepala Tukang 0.0040 Oh 44,000.00 176
Mandor 0.0040 Oh 55,000.00 220
Tenaga
Perkerja 0.0800 Oh 27,500.00 2,200
Tukang Batu 0.040 Oh 35,750.00 1,430
Kepala Tukang 0.0040 Oh 44,000.00 176
Mandor 0.0040 Oh 55,000.00 220
Tenaga
Perkerja 0.0600 Oh 27,500.00 1,650
Tukang Batu 0.030 Oh 35,750.00 1,073
Kepala Tukang 0.0030 Oh 44,000.00 132
Mandor 0.0030 Oh 55,000.00 165
Tenaga
Perkerja 0.9000 Oh 27,500.00 24,750
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248
Tenaga
Perkerja 0.9000 Oh 27,500.00 24,750
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248
Tenaga
Perkerja 0.9000 Oh 27,500.00 24,750
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248
Tenaga
Perkerja 0.9000 Oh 27,500.00 24,750
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248
Tenaga
Perkerja 0.9000 Oh 27,500.00 24,750
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248
Tenaga
Perkerja 0.9000 Oh 27,500.00 24,750
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248
Tenaga
Perkerja 0.9000 Oh 27,500.00 24,750
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248
Tenaga
Perkerja 0.2700 Oh 27,500.00 7,425
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.0150 Oh 44,000.00 660
Mandor 0.0135 Oh 55,000.00 743
Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650
Tenaga
Perkerja 0.0900 Oh 27,500.00 2,475
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248
Tenaga
Perkerja 0.0900 Oh 27,500.00 2,475
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248
Tenaga
Perkerja 0.0900 Oh 27,500.00 2,475
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248
Tenaga
Perkerja 0.0800 Oh 27,500.00 2,200
Tukang Batu 0.080 Oh 35,750.00 2,860
Kepala Tukang 0.0080 Oh 44,000.00 352
Mandor 0.0040 Oh 55,000.00 220
Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650
Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650
Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650
Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650
Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650
Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650
Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650
Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650
Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650
Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650
Tenaga
Perkerja 0.1700 Oh 27,500.00 4,675
Tukang Batu 0.170 Oh 35,750.00 6,078
Kepala Tukang 0.0170 Oh 44,000.00 748
Mandor 0.0085 Oh 55,000.00 468
1 m² Pasang Lantai Karpet 100% Wool, 20% Nylon 127,050.00 11,968.00 139,018.00
Bahan
Carpet 80% Wool, 20% Nylon 1.050 m2 88,000.00 92,400.00
Lem Vinyl 0.350 Kg 99,000.00 34,650.00
Tenaga
Perkerja 0.1700 Oh 27,500.00 4,675
Tukang Batu 0.170 Oh 35,750.00 6,078
Kepala Tukang 0.0170 Oh 44,000.00 748
Mandor 0.0085 Oh 55,000.00 468
Tenaga
Perkerja 0.1200 Oh 27,500.00 3,300
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0060 Oh 55,000.00 330
Tenaga
Perkerja 0.1700 Oh 27,500.00 4,675
Tukang Batu 0.170 Oh 35,750.00 6,078
Kepala Tukang 0.0170 Oh 44,000.00 748
Mandor 0.0085 Oh 55,000.00 468
Tenaga
Perkerja 0.6500 Oh 27,500.00 17,875
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0325 Oh 55,000.00 1,788
VI PEKERJAAN PENGECATAN
1 m² Mengikis / Mengerok Permukaan Cat Tembok Lama 357.50 #VALUE! #VALUE!
Bahan
Soda Api 0.050 Kg 7,150.00 357.50
Tenaga
Perkerja 0.1500 Oh 27,500.00 4,125
Tukang Cat - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.0025 Oh 55,000.00 138
1 m² Mencuci Bidang Permukaan Tembok yang Pernah dicat 192.50 #VALUE! #VALUE!
Bahan
Sabun 0.050 Kg 3,850.00 192.50
Tenaga
Perkerja 0.1500 Oh 27,500.00 4,125
Tukang Cat - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.0025 Oh 55,000.00 138
1 m² Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual 192.50 #VALUE! #VALUE!
Bahan
Sabun 0.050 Kg 3,850.00 192.50
Tenaga
Perkerja 0.1500 Oh 27,500.00 4,125
Tukang Cat - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.0025 Oh 55,000.00 138
1 m² Mengerok Karat atau Cat Lama Permukaan Baja dgn Pancar Pasir ( Sanblasting ) dgn Tingkat Kebersihan Sa 2½. 577,500.00 159,500.00 737,000.00
Bahan
Pasir Silika 40.000 Kg 13,200.00 528,000.00
BBM 10.000 Ltr 4,950.00 49,500.00
Peralatan
Kompresor, Blasting Pot , Selang Dan Nozzle sewa / Hr
Tenaga
Perkerja 1.6000 Oh 27,500.00 44,000
Tukang Cat 1.600 Oh 33,000.00 52,800
Kepala Tukang 0.8000 Oh 44,000.00 35,200
Mandor 0.5000 Oh 55,000.00 27,500
1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup 15,290.00 2,623.50 17,913.50
Bahan
Cat Meni 0.200 Kg 16,500.00 3,300.00
Plamir 0.150 Kg 19,800.00 2,970.00
Cat Dasar 0.170 Kg 11,000.00 1,870.00
Cat Kayu glotek 0.260 Kg 27,500.00 7,150.00
Tenaga
Perkerja 0.0700 Oh 27,500.00 1,925
Tukang Cat 0.009 Oh 33,000.00 297
Kepala Tukang 0.0060 Oh 44,000.00 264
Mandor 0.0025 Oh 55,000.00 138
1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup 17,765.00 5,703.50 23,468.50
Bahan
Cat Meni 0.200 Kg 16,500.00 3,300.00
Plamir 0.150 Kg 19,800.00 2,970.00
Cat Dasar 0.170 Kg 11,000.00 1,870.00
Cat Kayu glotek 0.350 Kg 27,500.00 9,625.00
Tenaga
Perkerja 0.0700 Oh 27,500.00 1,925
Tukang Cat 0.105 Oh 33,000.00 3,465
Kepala Tukang 0.0040 Oh 44,000.00 176
Mandor 0.0025 Oh 55,000.00 138
1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup 17,765.00 5,703.50 23,468.50
Bahan
Cat Meni 0.200 Kg 16,500.00 3,300.00
Plamir 0.150 Kg 19,800.00 2,970.00
Cat Dasar 0.170 Kg 11,000.00 1,870.00
Cat Kayu glotek 0.350 Kg 27,500.00 9,625.00
Tenaga
Perkerja 0.0700 Oh 27,500.00 1,925
Tukang Cat 0.105 Oh 33,000.00 3,465
Kepala Tukang 0.0040 Oh 44,000.00 176
Mandor 0.0025 Oh 55,000.00 138
1 m² Pelaburan Bidang Kayu dengan Cat Residu dan Ter 5,390.00 #VALUE! #VALUE!
Bahan
Residu atau Ter 0.350 Ltr 15,400.00 5,390.00
Tenaga
Perkerja 0.1000 Oh 27,500.00 2,750
Tukang Cat - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.0060 Oh 55,000.00 330
1 m² Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) 6,512.00 3,043.70 9,555.70
Bahan
Plamir 0.100 Kg 19,800.00 1,980.00
Cat Dasar 0.100 Kg 11,000.00 1,100.00
Cat Tembok vinilex 0.260 Kg 13,200.00 3,432.00
Tenaga
Perkerja 0.0200 Oh 27,500.00 550
Tukang Cat 0.063 Oh 33,000.00 2,079
Kepala Tukang 0.0063 Oh 44,000.00 277
Mandor 0.0025 Oh 55,000.00 138
1 m² Pengecatan Permukaan Baja dengan Meni Besi dan Perancah 4,697.00 15,702.50 20,399.50
Bahan
Meni Besi 0.100 Kg 16,500.00 1,650.00
Kuas 0.010 Bh 7,700.00 77.00
Perancah Kayu 0.002 m3 1,485,000.00 2,970.00
Tenaga
Perkerja 0.2500 Oh 27,500.00 6,875
Tukang Cat 0.225 Oh 33,000.00 7,425
Kepala Tukang 0.0225 Oh 44,000.00 990
Mandor 0.0075 Oh 55,000.00 413
1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 4 Lapis Cat Konvensional, tebal 200 um 7,524.00 1,765.50 9,289.50
Bahan
Meni ( Read Lead ) A 0.100 Kg 9,900.00 990.00
Meni ( Read Lead ) B 0.100 Kg 12,100.00 1,210.00
Alluminium C 0.040 Kg 27,500.00 1,100.00
Alluminium B 0.040 Kg 29,700.00 1,188.00
Pengencer 0.010 Ltr 6,600.00 66.00
Perancah Kayu 0.002 m3 1,485,000.00 2,970.00
Tenaga
Perkerja 0.0060 Oh 27,500.00 165
Tukang Cat 0.006 Oh 33,000.00 198
Kepala Tukang 0.0225 Oh 44,000.00 990
Mandor 0.0075 Oh 55,000.00 413
1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 1 Lapis Cat Mutakhir, tebal 200 um 4,950.00 3,003.00 7,953.00
Bahan
Meni Besi 0.300 Kg 16,500.00 4,950.00
Tenaga
Perkerja 0.0060 Oh 27,500.00 165
Tukang Cat 0.060 Oh 33,000.00 1,980
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0060 Oh 55,000.00 330
1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 3 Lapis Cat Konvensional, tebal 200 um 4,136.00 64,350.00 68,486.00
Bahan
Cat Dasar 0.110 Kg 11,000.00 1,210.00
Cat Antara 0.170 Kg 11,000.00 1,870.00
Cat Penutup 0.080 Kg 13,200.00 1,056.00
Tenaga
Perkerja 0.5000 Oh 27,500.00 13,750
Tukang Cat 0.800 Oh 33,000.00 26,400
Kepala Tukang 0.3000 Oh 44,000.00 13,200
Mandor 0.2000 Oh 55,000.00 11,000
1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Semprot ( Airless Spray ) dgn Sistem 1 Lapis Cat Mutakhir, tebal 200 um 3,300.00 53,900.00 57,200.00
Bahan
Cat Dasar 0.300 Kg 11,000.00 3,300.00
Tenaga
Perkerja 0.4000 Oh 27,500.00 11,000
Tukang Cat 0.700 Oh 33,000.00 23,100
Kepala Tukang 0.2000 Oh 44,000.00 8,800
Mandor 0.2000 Oh 55,000.00 11,000
UKURAN BESI BETON
1 Ø 22 12 m 2.984 35.808
2 Ø 19 12 m 2.226 26.712
3 Ø 16 12 m 1.578 18.936
4 Ø 14 12 m 1.208 14.496
5 Ø 12 12 m 0.888 10.656
6 Ø 10 12 m 0.617 7.404
7 Ø8 12 m 0.395 4.74
8 Ø6 12 m 0.222 2.664
DAFTAR HARGA SATUAN UPAH DAN MATERIAL/BAHAN NON LOKAL
Propinsi : a
Kabupaten : b
Kecamatan : c
Desa : d
HARGA
ONGKOS PAJAK PAJAK PPh
NO URAIAN SAT. SATUAN GALIAN C JUMLAH HARGA RAB
MUAT PPn ( 10 % ) (1,5 % )
(RP)
I UPAH
1 Tukang HOK 80,000 4,000 84,000 84,000
2 Pekerja HOK 50,000 2,500 52,500 52,500
II BAHAN
2 Besi Beton Ф 6 mm Btg 25,000 2,500 375 27,875 27,900
6 Besi Beton Ф 10 mm Btg 63,000 6,300 945 70,245 70,200
8 Besi Beton Ф 12 mm Btg 90,000 9,000 1,350 100,350 100,400
10 Besi Siku Btg 146,000 14,600 2,190 162,790 162,800
11 Besi Siku Btg 201,000 20,100 3,015 224,115 224,100
12 Kawat Ikat Kg 23,000 2,300 345 25,645 25,600
13 Beugel U Bulat ø 16 mm - 52.cm Bh 23,000 2,300 345 25,645 25,600
14 Beugel U Plat - 60 cm Bh 23,000 2,300 345 25,645 25,600
15 Plat Strip ≠ 5 mm - 40 cm Bh 13,000 1,300 195 14,495 14,500
16 Baut Bulat Angkur ø 12 mm - 10 cm Bh 4,250 425 64 4,739 4,700
17 Baut Bulat Angkur ø 12 mm - 15 cm Bh 5,000 500 75 5,575 5,600
18 Baut Bulat Angkur ø 12 mm - 25 cm Bh 6,000 600 90 6,690 6,700
19 Baut Bulat ø 12 mm - 30 cm Bh 8,000 800 120 8,920 8,900
20 Ring/Cincin Baut Bh 500 50 8 558 600
21 Paku 2-3 cm kg 26,000 2,600 390 28,990 29,000
22 Paku 5 cm kg 16,000 1,600 240 17,840 17,800
23 Paku 7 cm kg 16,000 1,600 240 17,840 17,800
24 Paku 10 cm kg 16,000 1,600 240 17,840 17,800
25 Paku 12 cm kg 16,000 1,600 240 17,840 17,800
26 Paku Beton 7 cm kg 21,000 2,100 315 23,415 23,400
27 Paku Beton 10 cm kg 21,000 2,100 315 23,415 23,400
28 Paku Beton 12 cm kg 21,000 2,100 315 23,415 23,400
29 Paku Seng Kg 23,000 2,300 345 25,645 25,600
31 Seng Gelombang BJLS 0,30 mm Lbr 61,000 6,100 915 68,015 68,000
37 Seng plat 40 cm m' 13,000 1,300 195 14,495 14,500
46 Keramik 30 x 30 cm Putih Polos dos 39,000 3,900 585 43,485 43,500
49 Keramik 20 x 20 cm Putih Polos Dos 46,000 4,600 690 51,290 51,300
56 Keramik 20 x 25 cm Bertekstur (Wc/Km) Dos 48,000 4,800 720 53,520 53,500
57 Plint Keramik 10 x 20 cm Bh 8,000 800 120 8,920 8,900
58 Tegel Wafel 20 x 25 cm Dos 1,000 100 15 1,115 1,100
63 Semen Bosowa Zak 61,000 6,100 915 68,015 68,000
66 Semen Putih Zak 101,000 10,100 1,515 112,615 112,600
67 Semen Putih kg 6,000 600 90 6,690 6,700
68 Semen Warna ……… kg 13,000 1,300 195 14,495 14,500
69 Kaca Bening 3 mm M2 101,000 10,100 1,515 112,615 112,600
70 Kaca Riben/Gelap 3 mm M2 126,000 12,600 1,890 140,490 140,500
71 Kaca Bening 5 mm M2 141,000 14,100 2,115 157,215 157,200
72 Kaca Riben/Gelap 5 mm M2 146,000 14,600 2,190 162,790 162,800
73 Tripleks 9 mm Lbr 123,000 12,300 1,845 137,145 137,100
74 Tripleks 6 mm Lbr 88,000 8,800 1,320 98,120 98,100
75 Tripleks 4 mm Lbr 66,000 6,600 990 73,590 73,600
76 Tripleks 3 mm Lbr 51,000 5,100 765 56,865 56,900
77 Teacwood 3 mm Lbr 101,000 10,100 1,515 112,615 112,600
79 Kursi Plastik Bh 51,000 5,100 765 56,865 56,900
80 Lem Aica-Aibon kg 51,000 5,100 765 56,865 56,900
84 Plamir Tembok kg 5,000 500 75 5,575 5,600
85 Dumpul Kayu kg 5,000 500 75 5,575 5,600
87 Politur kg 66,000 6,600 990 73,590 73,600
89 Meni Kayu ltr 23,000 2,300 345 25,645 25,600
90 Meni Besi ltr 23,000 2,300 345 25,645 25,600
94 Cat Seng kg 21,000 2,100 315 23,415 23,400
97 Cat Tembok kg 18,000 1,800 270 20,070 20,100
105 Cat Kayu kg 46,000 4,600 690 51,290 51,300
107 Minyak Cat/Tinner Ltr 26,000 2,600 390 28,990 29,000
109 Amplas Kayu Lbr 3,000 300 45 3,345 3,300
114 Kwas Biasa 4'' Bh 10,000 1,000 150 11,150 11,200
115 Kwas Biasa 3'' Bh 8,000 800 120 8,920 8,900
116 Kwas Biasa 2'' Bh 5,000 500 75 5,575 5,600
117 Kwas Biasa 1'' Bh 4,000 400 60 4,460 4,500
118 Kwas Biasa 3/4'' Bh 2,000 200 30 2,230 2,200
120 Kwas Roll Bh 15,000 1,500 225 16,725 16,700
121 Bak / tempat Cat Tembok Bh 18,000 1,800 270 20,070 20,100
122 Ember Air Bh 18,000 1,800 270 20,070 20,100
123 Kunci tanam 2 x Putar Bh 136,000 13,600 2,040 151,640 151,600
129 Grendel Pintu Bh 13,000 1,300 195 14,495 14,500
131 Grendel Jendela Bh 4,000 400 60 4,460 4,500
132 Grendel Jendela Bh 4,000 400 60 4,460 4,500
133 Grendel Jendela Bh 8,000 800 120 8,920 8,900
134 Engsel Pintu Bh 18,000 1,800 270 20,070 20,100
137 Engsel Jendela Bh 13,000 1,300 195 14,495 14,500
140 Kait Angin Bh 8,000 800 120 8,920 8,900
141 Sekring Box Bh 36,000 3,600 540 40,140 40,100
147 Lampu Phillips 23 watt Bh 41,000 4,100 615 45,715 45,700
150 Fiting Lampu Bh 4,000 400 60 4,460 4,500
151 Saklar Ganda Bh 16,000 1,600 240 17,840 17,800
152 Saklar Tunggal Bh 13,000 1,300 195 14,495 14,500
153 Stop Kontak Lengkap Bh 16,000 1,600 240 17,840 17,800
154 Embol Dos Bh 3,000 300 45 3,345 3,300
155 Kabel Listrik NYM 2 x 1,5 mm Rol 551,000 55,100 8,265 614,365 614,400
161 Klem kabel 10 mm Btg 12,000 1,200 180 13,380 13,400
162 Isolasi Listrik Bh 8,000 800 120 8,920 8,900
163 Sekerup 2.5 cm Doz 7,000 700 105 7,805 7,800
164 Pipa PVC Ф 5/8" (Pembks Kabel) Bh 8,000 800 120 8,920 8,900
165 Pipa PVC 4'' Btg 96,000 9,600 1,440 107,040 107,000
167 Pipa PVC 3'' Btg 76,000 7,600 1,140 84,740 84,700
170 Pipa PVC 2 1/2'' Btg 126,000 12,600 1,890 140,490 140,500
172 Pipa PVC 2 '' Btg 101,000 10,100 1,515 112,615 112,600
174 Pipa PVC 1 1/2'' Btg 76,000 7,600 1,140 84,740 84,700
176 Pipa PVC 1 '' Btg 41,000 4,100 615 45,715 45,700
177 Socket PVC 4'' Bh 23,000 2,300 345 25,645 25,600
178 Elbow PVC 4'' Bh 37,000 3,700 555 41,255 41,300
179 Elbow PVC 1 1/2'' Bh 6,000 600 90 6,690 6,700
180 Socket PVC 1 1/2'' Bh 5,000 500 75 5,575 5,600
181 Tee PVC 1 1/2'' Bh 7,000 700 105 7,805 7,800
182 Knee / Elbow PVC 1 1/2'' Bh 6,000 600 90 6,690 6,700
183 Lem Paralon Bh 8,000 800 120 8,920 8,900
184 Kran air 1/2'' dorong Bh 18,000 1,800 270 20,070 20,100
185 Floor drain ( Plastik ) Bh 12,000 1,200 180 13,380 13,400
186 Wastafel / Kizincing Bh 276,000 27,600 4,140 307,740 307,700
187 Kloset Jongkok Bh 146,000 14,600 2,190 162,790 162,800
189 Kloset Duduk Bh 401,000 40,100 6,015 447,115 447,100
190 Knee / Elbow GIP dia 1/2" Bh 5,000 500 75 5,575 5,600
191 Watermur GIP dia 1/2" Bh 12,000 1,200 180 13,380 13,400
192 Watermur GIP dia 1" Bh 18,000 1,800 270 20,070 20,100
193 Tee GIP dia 1" Bh 10,000 1,000 150 11,150 11,200
195 Oversock GIP dia 1"-1/2" Bh 13,000 1,300 195 14,495 14,500
196 Pipa GIP dia 1'' btg 185,000 18,500 2,775 206,275 206,300
197 Pipa GIP dia 1/2'' btg 126,000 12,600 1,890 140,490 140,500
198 Socket GIP dia 1/2'' Bh 5,000 500 75 5,575 5,600
199 Socket GIP dia 1'' Bh 7,000 700 105 7,805 7,800
200 Tee GIP dia 1/2'' Bh 8,000 800 120 8,920 8,900
201 Selotip Bh 4,000 400 60 4,460 4,500
202 Lem Silicon Bh 15,000 1,500 225 16,725 16,700
204 Pipa Hawa dia 1 1/2" Bh 20,000 2,000 300 22,300 22,300
205 Cangkul Bh 60,000 6,000 900 66,900 66,900
206 Linggis Bh 50,000 5,000 750 55,750 55,800
207 Pick Weel Bh 60,000 6,000 900 66,900 66,900
208 Sekop Bh 60,000 6,000 900 66,900 66,900
209 Sekop Bh 75,000 7,500 1,125 83,625 83,600
210 Ember Kecil Biasa (Cor) Rol 8,000 800 120 8,920 8,900
212 Ember (Campuran) Bh 10,000 1,000 150 11,150 11,200
214 Ember Bak (Untuk Matex) M' 18,000 1,800 270 20,070 20,100
215 Sendok Semen Bh 13,000 1,300 195 14,495 14,500
216 Setrika Kayu bh 15,000 1,500 225 16,725 16,700
217 Lat /mistar Alluminium bh 23,000 2,300 345 25,645 25,600
218 Benang Nilon bh 10,000 1,000 150 11,150 11,200
219 Meteran 5 M bh 12,000 1,200 180 13,380 13,400
220 Hamer Kecil bh 18,000 1,800 270 20,070 20,100
221 Hamer Sedang bh 25,000 2,500 375 27,875 27,900
222 Selang waterpas bh 3,000 300 45 3,345 3,300
223 Selang Air set 180,000 18,000 2,700 200,700 200,700
225 Terpal bh 150,000 15,000 2,250 167,250 167,300
226 Drom Air bh 250,000 25,000 3,750 278,750 278,800
229 Gergaji Kayu bh 40,000 4,000 600 44,600 44,600
230 Gagang Gergaji Besi bh 28,000 2,800 420 31,220 31,200
231 Mata Gergaji Waja bh 15,000 1,500 225 16,725 16,700
232 Mata Gergaji Biasa bh 3,000 300 45 3,345 3,300
233 Kakatua bh 18,000 1,800 270 20,070 20,100
234 Tang Besar bh 30,000 3,000 450 33,450 33,500
235 Tang Sedang bh 12,000 1,200 180 13,380 13,400
236 Obeng Bunga sedang bh 8,000 800 120 8,920 8,900
237 Obeng Plat sedang bh 8,000 800 120 8,920 8,900
238 Alat Pemotong Keramik bh 135,000 13,500 2,025 150,525 150,500
239 Kawat Ayakan halus M' 20,000 2,000 300 22,300 22,300
240 Kawat Ayakan kasar M' 20,000 2,000 300 22,300 22,300
241 Kunci Pipa 1/2'' - 2'' No 26 bh 90,000 9,000 1,350 100,350 100,400
242 Kunci Pipa 1/2'' - 2'' No 36 bh 160,000 16,000 2,400 178,400 178,400
243 Kunci Pipa 3'' bh 300,000 30,000 4,500 334,500 334,500
244 Pisau Dumpul kecil bh 4,000 400 60 4,460 4,500
245 Pisau Dumpul besar bh 6,000 600 90 6,690 6,700
246 Pisau Plamir kecil bh 4,000 400 60 4,460 4,500
247 Pisau Plamir besar bh 6,000 600 90 6,690 6,700
DAFTAR HARGA SATUAN UPAH DAN MATERIAL/BAHAN NON LOKAL
Propinsi : a
Kabupaten : b
Kecamatan : c
Desa : d
HARGA
ONGKOS PAJAK PAJAK PPh
NO URAIAN SAT. SATUAN GALIAN C JUMLAH HARGA RAB
MUAT PPn ( 10 % ) (1,5 % )
(RP)
I UPAH
1 Tukang HOK 40,000
2 Pekerja HOK 30,000
II BAHAN
1 Batako Bh
3 Batu Belah 15/20 M³ 98,000 7,500 20,000 9,800 1,470 136,770 136,800
4 Batu Belah 5/7 M³ 108,000 7,500 20,000 10,800 1,620 147,920 147,900
5 Batu Belah 3/5 M³ 328,000 7,500 20,000 32,800 4,920 393,220 393,200
6 Batu Belah 2/3 M³ 328,000 8,000 20,000 32,800 4,920 393,720 393,700
I BAHAN
1 Lemari Buku bh
ukr. Pjg 0,70, lbr 0,40 tinggi 1,50 m
Rak atas kaca dorong 3 mm
* Rangka kayu kls I Bayam 4/5, penutup triplek 2,8 mm, 1 daun pintu Jati 1,260,000 126,000 18,900 1,404,900 1,404,900
* Rangka kayu Jati 4/5, penutup triplek 2,8 mm, 1 daun pintu Jati 1,260,000 126,000 18,900 1,404,900 1,404,900
* Rangka kayu Mahoni 4/5, penutup triplek 2,8 mm, 1 daun pintu Mahoni 910,000 91,000 13,650 1,014,650 1,014,700
- - - -
2 Papan Tulis bh 405,000 40,500 6,075 451,575 451,600
ukr. Pjg 1,5 m, lebar 1,25 m
Rangka kayu Kls I bayam
5 Meja murid bh
ukr. Tinggi 0,75 m
panjang 1,00 m, Lebar 0.60 m
* Rangka kayu kls I Bayam 4/5, penutup triplek / Daun Papan Jati 508,000 50,800 7,620 566,420 566,400
* Rangka kayu Jati 4/5, penutup triplek / Daun Papan Jati 505,000 50,500 7,575 563,075 563,100
6 Kursi murid bh
ukr. Tinggi 0,90 m
tinggi duduk 0,40 m
lebar depan 0,40 m , Lebar samping 0.40 m
* Rangka kayu kls I Bayam , penutup / Daun Papan Jati 355,000 35,500 5,325 395,825 395,800
* Rangka kayu Jati , penutup / Daun Papan Jati 355,000 35,500 5,325 395,825 395,800
17 Kusen Pintu type III standar bh 560,000 56,000 8,400 624,400 624,400
Ukr Kayu Kosen 5/13 cm
Ukr. Bersih dalam, tinggi lubang pintu 2,00 m, lebar 0,70 m
Tanpa lubang Ventilasi
Kayu Kls I, Jenis Bayam
GALIAN C
ONGKOS MUAT /
PPN PPh JUMLAH
JUMLAH HARGA SAT.
NO MATERIAL SATUAN HARGA DASAR ANGKUT RAB
13 Bangku Kayu Jati Lokal Unit 300,000 30,000 4,500 334,500 335,000
Suren Unit 250,000 25,000 3,750 278,750 279,000
TOKO / FABRIKASI
1 Semen 40 kg
Bosowa Zak 55,000 5,000 5,500 825 66,325 66,000
Tonasa Zak 55,000 5,000 5,500 825 66,325 66,000
Gresik Zak 55,000 5,000 5,500 825 66,325 66,000
2 Besi polos Ø 12 mm Asli ( SNI ) Lonjor 200,000 20,000 3,000 223,000 223,000
3 Besi polos Ø 10 mm Asli ( SNI ) Lonjor 91,000 9,100 1,365 101,465 101,000
4 Besi polos Ø 8 mm Asli ( SNI ) Lonjor 70,000 7,000 1,050 78,050 78,000
5 Besi polos Ø 6 mm Asli ( SNI ) Lonjor 47,000 4,700 705 52,405 52,000
6 Kawat beton kg 25,000 2,500 375 27,875 28,000
7 Seng Gel. BJLS 0,30 - - -
Warna Lbr 48,000 4,800 720 53,520 54,000
Polos Lbr 70,000 7,000 1,050 78,050 78,000
8 Paku seng kg 28,000 2,800 420 31,220 31,000
9 Seng plat 0,30 m 20,000 2,000 300 22,300 22,000
10 Paku 16 kg 20,000 2,000 300 22,300 22,000
11 Paku 12 (Paku Putih) kg 20,000 2,000 300 22,300 22,000
12 Paku 12 (Biasa) kg 20,000 2,000 300 22,300 22,000
13 Paku 10 biasa kg 20,000 2,000 300 22,300 22,000
14 Paku 7 biasa kg 20,000 2,000 300 22,300 22,000
15 Paku 5 biasa kg 20,000 2,000 300 22,300 22,000
16 Plat Strip Tebal 4 mm - Pjg 60 cm Bh 15,000 1,500 225 16,725 17,000
17 Plat Strip Tebal 4 mm - Pjg 40 cm Bh 15,000 1,500 225 16,725 17,000
18 Plat Strip Tebal 4 mm - Pjg 20 cm Bh 15,000 1,500 225 16,725 17,000
18 Beugel U bulat 3 - 60 cm Bh 15,000 1,500 225 16,725 17,000
19 Mor Baut ø 12 mm - Panjang 16 cm Bh 10,000 1,000 150 11,150 11,000
20 Mor Baut ø 12 mm - Panjang 30 cm Bh 10,000 1,000 150 11,150 11,000
21 Baut Angkur ø 14 mm - Pjg 25 cm Bh 10,000 1,000 150 11,150 11,000
22 Ring/Cinci Baut Bh 500 50 8 558 1,000
23 Engsel Pintu Merk ................................. Bh 30,000 3,000 450 33,450 33,000
Merk ................................. Bh 30,000 3,000 450 33,450 33,000
Merk ................................. Bh 30,000 3,000 450 33,450 33,000
24 Engsel Jendela Merk ................................. Bh 20,000 2,000 300 22,300 22,000
Merk ................................. Bh 20,000 2,000 300 22,300 22,000
Merk ................................. Bh 20,000 2,000 300 22,300 22,000
25 Grendel Pintu Merk ................................. Bh 15,000 1,500 225 16,725 17,000
Merk ................................. Bh 15,000 1,500 225 16,725 17,000
Merk ................................. Bh 15,000 1,500 225 16,725 17,000
26 Kait Angin Merk ................................. Bh 15,000 1,500 225 16,725 17,000
Merk ................................. Bh 15,000 1,500 225 16,725 17,000
Merk ................................. Bh 15,000 1,500 225 16,725 17,000
27 Grendel Jendela Merk ................................. Bh 15,000 1,500 225 16,725 17,000
Merk ................................. Bh 15,000 1,500 225 16,725 17,000
Merk ................................. Bh 15,000 1,500 225 16,725 17,000
28 Kunci Tanam Doubel Slag Merk ................................. Bh 120,000 12,000 1,800 133,800 134,000
Merk ................................. Bh 150,000 15,000 2,250 167,250 167,000
Merk ................................. Bh 100,000 10,000 1,500 111,500 112,000
29 Keramik 40x40 cm Merk ................................. dos 95,000 9,500 1,425 105,925 106,000
30 Keramik 30x30 cm Merk ................................. dos 70,000 7,000 1,050 78,050 78,000
31 Keramik 20x20 cm Merk ................................. dos 65,000 6,500 975 72,475 72,000
Keramik lantai WC 20x20
32 Motif, Kasar dos 50,000 5,000 750 55,750 56,000
cm
33 Semen warna kg 20,000 2,000 300 22,300 22,000
34 Plywood 3 mm lbr 95,000 9,500 1,425 105,925 106,000
35 Plywood 9 mm lbr 120,000 12,000 1,800 133,800 134,000
36 Paku tripleks 3 cm kg 25,000 2,500 375 27,875 28,000
37 Cat seng (biru laut) Merk ................................. - -
5 ( Lima ) kg 60,000 6,000 900 66,900 67,000
1 ( Satu ) kg 20,000 2,000 300 22,300 22,000
38 Cat plafond (Putih) Merk ................................. - -
5 ( Lima ) kg 85,000 8,500 1,275 94,775 95,000
20 ( Dua Puluh ) kg 120,000 12,000 1,800 133,800 134,000
39 Cat dinding (kuning telur) Merk ................................. - -
5 ( Lima ) kg 85,000 8,500 1,275 94,775 95,000
20 ( Dua Puluh ) kg 120,000 12,000 1,800 133,800 134,000
40 Cat listplank (merah hati) Merk ................................. - -
5 ( Lima ) kg 60,000 6,000 900 66,900 67,000
1 ( Satu ) kg 20,000 2,000 300 22,300 22,000
Minyak cat/Tinner kg 25,000 2,500 375 27,875 28,000
Meni kg 25,000 2,500 375 27,875 28,000
41 Neon Spiral, Jari
Lampu Phillips 5 watt Bh 35,000 3,500 525 39,025 39,000
Lampu Phillips 8 watt Bh 50,000 5,000 750 55,750 56,000
Lampu Phillips 14 watt Bh 65,000 6,500 975 72,475 72,000
Lampu Phillips 18 watt Bh 70,000 7,000 1,050 78,050 78,000
Lampu Phillips 23 watt Bh 95,000 9,500 1,425 105,925 106,000
PERALATAN
1 Paquel Bh 60,000 6,000 900 66,900 67,000
2 Cangkul Bh 60,000 6,000 900 66,900 67,000
3 Linggis Bh 60,000 6,000 900 66,900 67,000
4 Sekop Bh 70,000 7,000 1,050 78,050 78,000
5 Ember Cor Bh 15,000 1,500 225 16,725 17,000
6 Ember Anti Pecah Ukuran Sedang Bh 25,000 2,500 375 27,875 28,000
7 Kuas biasa
Kecil Bh 10,000 1,000 150 11,150 11,000
Sedang Bh 12,000 1,200 180 13,380 13,000
Besar Bh 15,000 1,500 225 16,725 17,000
8 Kuas roll Bh 35,000 3,500 525 39,025 39,000
9 Kawat Ayak m' 25,000 2,500 375 27,875 28,000
10 Amplas Lbr 5,000 500 75 5,575 6,000
11 Benang Nillon Roll 10,000 1,000 150 11,150 20,000
12 Terpal 4 x 6 Bh 180,000 18,000 2,700 200,700 201,000
13 Gerobak Dorong Unit 400,000 40,000 6,000 446,000 446,000
14 Drom Plastik 200 Ltr Bh 200,000 20,000 3,000 223,000 223,000
LAIN - LAIN
1 Air Kerja 5000 ltr tanki 350,000 350,000 350,000
2 Papan Nama Proyek Baliho + Rangka Ls 100,000 100,000 100,000
Kayu
Triplex + Rangka
Kayu Ls 100,000 100,000 100,000
3 Prasasti Keramik Bh 700,000 700,000 700,000
Pasangan Batu Ls 700,000 700,000 700,000
Menghitung Harga Satuan Pekerjaan
I. Pekerjaan Tanah
SNI 2835 - 2008
1.1 Menggali 1 m3 tanah biasa sedalam 1 meter Rp - Rp 19,875
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Mengurug kembali 1 m3
galian dihitung dari 1/3
1.9 Mengurug kembali 1 m3 galian
kali upah pekerjaan
galian
Mengurug kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kapur padam m 3
0.135 Rp - Rp -
Bahan Pasir Pasang m3 0.400 Rp 125,000 Rp 50,000
Tanah Liat m3 0.948 Rp - Rp -
Pekerja OH 0.800 Rp 25,000 Rp 20,000
Tukang batu OH 0.400 Rp 35,000 Rp 14,000
Tenaga kerja
Kepala tukang OH 0.040 Rp 40,000 Rp 1,600
Mandor OH 0.080 Rp 45,000 Rp 3,600
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Sirtu m 3
1.200 Rp - Rp -
Tenaga kerja Pekerja OH 0.250 Rp 25,000 Rp 6,250
Mandor OH 0.025 Rp 45,000 Rp 1,125
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
2.10 Memasang 1 m3 pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu belah Rp 268,400 Rp 125,800
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu belah 15 cm/20 cm m3 0.480 Rp 155,000 Rp 74,400
Portland Cement kg 194.000 Rp 1,000 Rp 194,000
Pasir beton m3 0.312 Rp - Rp -
Koral Beton m3 0.468 Rp - Rp -
Besi beton kg 126.000 Rp - Rp -
Kawat beton kg 1.800 Rp - Rp -
Bahan
Pekerja OH 3.400 Rp 25,000 Rp 85,000
Tukang batu OH 0.850 Rp 35,000 Rp 29,750
Kepala tukang OH 0.085 Rp 40,000 Rp 3,400
Tenaga kerja Mandor OH 0.170 Rp 45,000 Rp 7,650
3.2 Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 2) cm, w/c = 0,78
± Rp 276,000 Rp 55,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 276.000 Rp 1,000 Rp 276,000
Pasir beton ( kg ) kg 828.000 Rp - Rp -
koral beton kg kg 1,012.000 Rp - Rp -
Bahan Air Liter 215.000 Rp - Rp -
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Kepala tukang OH 0.028 Rp 40,000 Rp 1,120
Tenaga kerja Mandor OH 0.083 Rp 45,000 Rp 3,735
3.3 Membuat 1 m3 beton mutu f’c = 12,2 MPa (K 150), slump (12 2) cm, w/c = 0,72
± Rp 299,000 Rp 55,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 299.000 Rp 1,000 Rp 299,000
Pasir beton ( kg ) kg 799.000 Rp - Rp -
koral beton kg kg 1,017.000 Rp - Rp -
Bahan Air Liter 215.000 Rp - Rp -
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Kepala tukang OH 0.028 Rp 40,000 Rp 1,120
Tenaga kerja Mandor OH 0.083 Rp 45,000 Rp 3,735
CATATAN Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Bukling factor pasir = 20 %
3.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87 Rp 230,000 Rp 40,500
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 230.000 Rp 1,000 Rp 230,000
Pasir beton ( kg ) kg 893.000 Rp - Rp -
koral beton kg kg 1,027.000 Rp - Rp -
Bahan Air Liter 200.000 Rp - Rp -
Pekerja OH 1.200 Rp 25,000 Rp 30,000
Tukang batu OH 0.200 Rp 35,000 Rp 7,000
Kepala tukang OH 0.020 Rp 40,000 Rp 800
Tenaga kerja Mandor OH 0.060 Rp 45,000 Rp 2,700
3.5 Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66
± Rp 326,000 Rp 55,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 326.000 Rp 1,000 Rp 326,000
Pasir beton ( kg ) kg 760.000 Rp - Rp -
koral beton kg kg 1,029.000 Rp - Rp -
Bahan Air Liter 215.000 Rp - Rp -
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Kepala tukang OH 0.028 Rp 40,000 Rp 1,120
Tenaga kerja Mandor OH 0.083 Rp 45,000 Rp 3,735
3.6 Membuat 1 m3 beton mutu f’c = 16,9 MPa (K 200), slump (12 2) cm, w/c = 0,61
± Rp 352,000 Rp 55,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 352.000 Rp 1,000 Rp 352,000
Pasir beton ( kg ) kg 731.000 Rp - Rp -
koral beton kg kg 1,031.000 Rp - Rp -
Bahan Air Liter 215.000 Rp - Rp -
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Kepala tukang OH 0.028 Rp 40,000 Rp 1,120
Tenaga kerja Mandor OH 0.083 Rp 45,000 Rp 3,735
3.7 Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58
± Rp 371,000 Rp 55,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 371.000 Rp 1,000 Rp 371,000
Pasir beton ( kg ) kg 698.000 Rp - Rp -
koral beton kg kg 1,047.000 Rp - Rp -
Bahan Air Liter 215.000 Rp - Rp -
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Kepala tukang OH 0.028 Rp 40,000 Rp 1,120
Tenaga kerja Mandor OH 0.083 Rp 45,000 Rp 3,735
3.8 Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 2) cm, w/c = 0,56
± Rp 384,000 Rp 55,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 384.000 Rp 1,000 Rp 384,000
Pasir beton ( kg ) kg 692.000 Rp - Rp -
koral beton kg kg 1,039.000 Rp - Rp -
Bahan Air Liter 215.000 Rp - Rp -
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Kepala tukang OH 0.028 Rp 40,000 Rp 1,120
Tenaga kerja Mandor OH 0.083 Rp 45,000 Rp 3,735
3.9 Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275), slump (12 2) cm, w/c = 0,53
± Rp 406,000 Rp 55,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 406.000 Rp 1,000 Rp 406,000
Pasir beton ( kg ) kg 684.000 Rp - Rp -
koral beton kg kg 1,026.000 Rp - Rp -
Bahan Air Liter 215.000 Rp - Rp -
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Kepala tukang OH 0.028 Rp 40,000 Rp 1,120
Tenaga kerja Mandor OH 0.083 Rp 45,000 Rp 3,735
3.10 Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 2) cm, w/c = 0,52
± Rp 413,000 Rp 55,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 413.000 Rp 1,000 Rp 413,000
Pasir beton m3 681.000 Rp - Rp -
Koral Beton m3 1,021.000 Rp - Rp -
Bahan Air Liter 215.000 Rp - Rp -
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Kepala tukang OH 0.028 Rp 40,000 Rp 1,120
Tenaga kerja Mandor OH 0.083 Rp 45,000 Rp 3,735
3.11 Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (12 2) cm, w/c = 0,49
± Rp 439,000 Rp 70,875
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 439.000 Rp 1,000 Rp 439,000
Pasir beton ( kg ) kg 670.000 Rp - Rp -
koral beton kg kg 1,006.000 Rp - Rp -
Bahan Air Liter 215.000 Rp - Rp -
Pekerja OH 2.100 Rp 25,000 Rp 52,500
Tukang batu OH 0.350 Rp 35,000 Rp 12,250
Kepala tukang OH 0.035 Rp 40,000 Rp 1,400
Tenaga kerja Mandor OH 0.105 Rp 45,000 Rp 4,725
3.12 Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (12 2) cm, w/c = 0,48
± Rp 448,000 Rp 70,875
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 448.000 Rp 1,000 Rp 448,000
3.13 Membuat 1 m3 beton kedap air dengan strorox – 100 Rp 400,000 Rp 70,875
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 400.000 Rp 1,000 Rp 400,000
Pasir beton m3 0.480 Rp - Rp -
Koral Beton m3 0.800 Rp - Rp -
Bahan Strorox – 100 kg 1.200 Rp - Rp -
Pekerja OH 2.100 Rp 25,000 Rp 52,500
Tukang batu OH 0.350 Rp 35,000 Rp 12,250
Kepala tukang OH 0.035 Rp 40,000 Rp 1,400
Tenaga kerja Mandor OH 0.105 Rp 45,000 Rp 4,725
Rp -
Bahan panjang 4 m Batang ### Rp -
Pekerja OH ### Rp 25,000 Rp 16,500
Tukang kayu OH ### Rp - Rp -
Kepala tukang OH ### Rp 40,000 Rp 1,320
Tenaga kerja Mandor OH ### Rp 45,000 Rp 1,485
Bahan
Menghitung Harga Satuan Pekerjaan
Rp -
panjang 4 m Batang 3.000 Rp -
Formite/penjaga jarak
Rp -
Bahan bekisting/spacer Buah 4.000 Rp -
Pekerja OH 0.660 Rp 25,000 Rp 16,500
Tukang kayu OH 0.330 Rp - Rp -
Kepala tukang OH 0.033 Rp 40,000 Rp 1,320
Tenaga kerja Mandor OH 0.033 Rp 45,000 Rp 1,485
Rp -
Bahan panjang 4 m Batang ### Rp -
Pekerja OH ### Rp 25,000 Rp 16,500
Tukang kayu OH ### Rp - Rp -
Kepala tukang OH ### Rp 40,000 Rp 1,320
Tenaga kerja Mandor OH ### Rp 45,000 Rp 1,485
Rp -
Bahan cm, panjang 4 m Batang 0.500 Rp -
Pekerja OH 0.150 Rp 25,000 Rp 3,750
Tukang kayu OH 0.050 Rp - Rp -
Kepala tukang OH 0.005 Rp 40,000 Rp 200
Tenaga kerja Mandor OH 0.008 Rp 45,000 Rp 360
3.28 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting) Rp 336,000 Rp 164,530
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.200 Rp - Rp -
Paku 5 cm – 12 cm kg 1.500 Rp - Rp -
Minyak bekisting Liter 0.400 Rp - Rp -
Besi beton polos kg 157.500 Rp - Rp -
Kawat beton kg 2.250 Rp - Rp -
Portland Cement kg 336.000 Rp 1,000 Rp 336,000
Pasir beton m3 0.540 Rp - Rp -
Bahan Koral Beton m3 0.810 Rp - Rp -
Pekerja OH 5.300 Rp 25,000 Rp 132,500
Tenaga kerja
Menghitung Harga Satuan Pekerjaan
3.29 Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting) Rp 336,000 Rp 176,530
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.270 Rp - Rp -
Paku 5 cm-12cm kg 2.000 Rp - Rp -
Minyak bekisting Liter 0.600 Rp - Rp -
Besi beton polos kg 210.000 Rp - Rp -
Kawat beton kg 3.000 Rp - Rp -
Portland Cement kg 336.000 Rp 1,000 Rp 336,000
Plywood 9 mm Lembar 3.500 Rp - Rp -
Pasir beton m3 0.540 Rp - Rp -
Bahan Koral Beton m3 0.810 Rp - Rp -
Pekerja OH 5.650 Rp 25,000 Rp 141,250
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Tukang kayu OH 1.560 Rp - Rp -
Tukang besi OH 1.400 Rp - Rp -
Kepala tukang OH 0.323 Rp 40,000 Rp 12,920
Tenaga kerja Mandor OH 0.283 Rp 45,000 Rp 12,735
3.30 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting) Rp 336,000 Rp 217,880
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.400 Rp - Rp -
Paku 5 cm – 12 cm kg 4.000 Rp - Rp -
Minyak bekisting Liter 2.000 Rp - Rp -
Besi beton polos kg 315.000 Rp - Rp -
Kawat beton kg 4.500 Rp - Rp -
Portland Cement kg 336.000 Rp 1,000 Rp 336,000
Pasir beton m3 0.540 Rp - Rp -
Koral Beton m3 0.810 Rp - Rp -
Kayu kelas II balok m3 0.150 Rp - Rp -
Plywood 9 mm Lembar 3.500 Rp - Rp -
Dolken kayu galam, (8-10) cm,
ö
Rp -
Bahan panjang 4 m Batang 20.000 Rp -
Pekerja OH 7.050 Rp 25,000 Rp 176,250
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Tukang kayu OH 1.650 Rp - Rp -
Tukang besi OH 2.100 Rp - Rp -
Kepala tukang OH 0.403 Rp 40,000 Rp 16,120
Tenaga kerja Mandor OH 0.353 Rp 45,000 Rp 15,885
3.31 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting) Rp 336,000 Rp 196,005
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.320 Rp - Rp -
Paku 5 cm – 12 cm kg 3.200 Rp - Rp -
Minyak bekisting Liter 1.600 Rp - Rp -
Besi beton polos kg 210.000 Rp - Rp -
Kawat beton kg 3.000 Rp - Rp -
Portland Cement kg 336.000 Rp 1,000 Rp 336,000
Pasir beton m3 0.540 Rp - Rp -
Koral Beton m3 0.810 Rp - Rp -
Kayu kelas II balok m3 0.140 Rp - Rp -
Plywood 9 mm Lembar 2.800 Rp - Rp -
Dolken kayu galam, (8-10) cm,
ö
Rp -
Bahan panjang 4 m Batang 16.000 Rp -
Pekerja OH 6.350 Rp 25,000 Rp 158,750
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Tukang kayu OH 1.650 Rp - Rp -
Tukang besi OH 1.400 Rp - Rp -
Kepala tukang OH 0.333 Rp 40,000 Rp 13,320
Tenaga kerja Mandor OH 0.318 Rp 45,000 Rp 14,310
3.32 Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting) Rp 336,000 Rp 164,650
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.320 Rp - Rp -
Paku 5 cm – 12 cm kg 3.200 Rp - Rp -
Minyak bekisting Liter 1.600 Rp - Rp -
Besi beton polos kg 157.500 Rp - Rp -
Kawat beton kg 2.250 Rp - Rp -
Portland Cement kg 336.000 Rp 1,000 Rp 336,000
Pasir beton m3 0.540 Rp - Rp -
Koral Beton m3 0.810 Rp - Rp -
Kayu kelas II balok m3 0.120 Rp - Rp -
Plywood 9 mm Lembar 2.800 Rp - Rp -
Dolken kayu galam, (8-10) cm,ö
Rp -
Bahan panjang 4 m Batang 32.000 Rp -
Pekerja OH 5.300 Rp 25,000 Rp 132,500
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Tukang kayu OH 1.300 Rp - Rp -
Tukang besi OH 1.050 Rp - Rp -
Kepala tukang OH 0.265 Rp 40,000 Rp 10,600
Tenaga kerja Mandor OH 0.265 Rp 45,000 Rp 11,925
3.33 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) Rp 336,000 Rp 164,530
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.240 Rp - Rp -
Paku 5 cm – 12 cm kg 3.200 Rp - Rp -
Minyak bekisting Liter 1.600 Rp - Rp -
Rp -
Bahan panjang 4 m Batang 24.000 Rp -
Pekerja OH 5.300 Rp 25,000 Rp 132,500
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Tukang kayu OH 1.300 Rp - Rp -
Tukang besi OH 1.050 Rp - Rp -
Kepala tukang OH 0.262 Rp 40,000 Rp 10,480
Tenaga kerja Mandor OH 0.265 Rp 45,000 Rp 11,925
3.34 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting) Rp 336,000 Rp 176,530
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.250 Rp - Rp -
Paku 5 cm – 12 cm kg 3.000 Rp - Rp -
Minyak bekisting Liter 1.200 Rp - Rp -
Besi beton polos kg 210.000 Rp - Rp -
Kawat beton kg 3.000 Rp - Rp -
Portland Cement kg 336.000 Rp 1,000 Rp 336,000
Pasir beton m3 0.540 Rp - Rp -
Koral Beton m3 0.810 Rp - Rp -
Kayu kelas II balok m3 0.105 Rp - Rp -
Plywood 9 mm Lembar 2.500 Rp - Rp -
Dolken kayu galam, (8-10) cm,
ö
Rp -
Bahan panjang 4 m Batang 14.000 Rp -
Pekerja OH 5.650 Rp 25,000 Rp 141,250
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Tukang kayu OH 1.560 Rp - Rp -
Tukang besi OH 1.400 Rp - Rp -
Kepala tukang OH 0.323 Rp 40,000 Rp 12,920
Tenaga kerja Mandor OH 0.283 Rp 45,000 Rp 12,735
3.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm Rp 4,000 Rp 5,845
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 ### Rp - Rp -
Paku 5 cm – 12 cm kg ### Rp - Rp -
Minyak bekisting Liter Rp - Rp -
Besi beton polos kg ### Rp - Rp -
Kawat beton kg ### Rp - Rp -
Portland Cement kg ### Rp 1,000 Rp 4,000
Pasir beton m3 ### Rp - Rp -
Bahan
Spesialis Infrastruktur NMC PNPM-MPd Page 150 of 289
Menghitung Harga Satuan Pekerjaan
3.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm Rp 5,500 Rp 9,655
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 ### Rp - Rp -
Paku 5 cm – 12 cm kg ### Rp - Rp -
Minyak bekisting Liter Rp - Rp -
Besi beton polos kg ### Rp - Rp -
Kawat beton kg ### Rp - Rp -
Portland Cement kg ### Rp 1,000 Rp 5,500
Pasir beton m3 ### Rp - Rp -
Bahan Koral Beton m3 ### Rp - Rp -
Pekerja OH ### Rp 25,000 Rp 7,425
Tukang batu OH ### Rp 35,000 Rp 1,155
Tukang kayu OH ### Rp - Rp -
Tukang besi OH ### Rp - Rp -
Kepala tukang OH ### Rp 40,000 Rp 400
Tenaga kerja Mandor OH ### Rp 45,000 Rp 675
4.1 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 2 PP Rp 53,500 Rp 24,150
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 140.000 Rp - Rp -
Portland Cement kg 43.500 Rp 1,000 Rp 43,500
Bahan Pasir Pasang m3 0.080 Rp 125,000 Rp 10,000
Pekerja OH 0.600 Rp 25,000 Rp 15,000
Tukang batu OH 0.200 Rp 35,000 Rp 7,000
Kepala tukang OH 0.020 Rp 40,000 Rp 800
Tenaga kerja Mandor OH 0.030 Rp 45,000 Rp 1,350
4.2 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 PP Rp 44,325 Rp 24,150
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 140.000 Rp - Rp -
Portland Cement kg 32.950 Rp 1,000 Rp 32,950
Bahan Pasir Pasang m3 0.091 Rp 125,000 Rp 11,375
Pekerja OH 0.600 Rp 25,000 Rp 15,000
Tukang batu OH 0.200 Rp 35,000 Rp 7,000
Tenaga kerja
Spesialis Infrastruktur NMC PNPM-MPd Page 151 of 289
Menghitung Harga Satuan Pekerjaan
4.3 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4 PP Rp 38,175 Rp 24,150
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 140.000 Rp - Rp -
Portland Cement kg 26.550 Rp 1,000 Rp 26,550
Bahan Pasir Pasang m3 0.093 Rp 125,000 Rp 11,625
Pekerja OH 0.600 Rp 25,000 Rp 15,000
Tukang batu OH 0.200 Rp 35,000 Rp 7,000
Kepala tukang OH 0.020 Rp 40,000 Rp 800
Tenaga kerja Mandor OH 0.030 Rp 45,000 Rp 1,350
4.4 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 5 PP Rp 34,950 Rp 24,150
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 140.000 Rp - Rp -
Portland Cement kg 22.200 Rp 1,000 Rp 22,200
Bahan Pasir Pasang m3 0.102 Rp 125,000 Rp 12,750
Pekerja OH 0.600 Rp 25,000 Rp 15,000
Tukang batu OH 0.200 Rp 35,000 Rp 7,000
Kepala tukang OH 0.020 Rp 40,000 Rp 800
Tenaga kerja Mandor OH 0.030 Rp 45,000 Rp 1,350
4.5 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 6 PP Rp 33,750 Rp 24,150
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 140.000 Rp - Rp -
Portland Cement kg 18.500 Rp 1,000 Rp 18,500
Bahan Pasir Pasang m3 0.122 Rp 125,000 Rp 15,250
Pekerja OH 0.600 Rp 25,000 Rp 15,000
Tukang batu OH 0.200 Rp 35,000 Rp 7,000
Kepala tukang OH 0.020 Rp 40,000 Rp 800
Tenaga kerja Mandor OH 0.030 Rp 45,000 Rp 1,350
4.6 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 KP : 10 PP Rp 21,643 Rp 24,150
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 140.000 Rp - Rp -
Portland Cement kg 10.080 Rp 1,000 Rp 10,080
Pasir Pasang m3 0.093 Rp 125,000 Rp 11,563
Bahan Kapur padam m3 0.028 Rp - Rp -
Pekerja OH 0.600 Rp 25,000 Rp 15,000
Tukang batu OH 0.200 Rp 35,000 Rp 7,000
Kepala tukang OH 0.020 Rp 40,000 Rp 800
Tenaga kerja Mandor OH 0.030 Rp 45,000 Rp 1,350
4.7 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 2 PP Rp 23,700 Rp 12,075
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp - Rp -
Bahan
Spesialis Infrastruktur NMC PNPM-MPd Page 152 of 289
Menghitung Harga Satuan Pekerjaan
4.8 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 3 PP Rp 19,370 Rp 12,075
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp - Rp -
Portland Cement kg 14.370 Rp 1,000 Rp 14,370
Bahan Pasir Pasang m3 0.040 Rp 125,000 Rp 5,000
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 35,000 Rp 3,500
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675
4.9 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 4 PP Rp 16,875 Rp 12,075
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp - Rp -
Portland Cement kg 11.500 Rp 1,000 Rp 11,500
Bahan Pasir Pasang m3 0.043 Rp 125,000 Rp 5,375
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 35,000 Rp 3,500
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675
4.10 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 5 PP Rp 15,305 Rp 12,075
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp - Rp -
Portland Cement kg 9.680 Rp 1,000 Rp 9,680
Bahan Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 35,000 Rp 3,500
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675
4.11 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 6 PP Rp 14,445 Rp 12,075
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp - Rp -
Portland Cement kg 8.320 Rp 1,000 Rp 8,320
Bahan Pasir Pasang m3 0.049 Rp 125,000 Rp 6,125
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 35,000 Rp 3,500
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675
4.12 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) tebal 1/2 bata, campuran spesi 1 PC : 8 PP Rp 12,750 Rp 12,075
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp - Rp -
Portland Cement kg 6.500 Rp 1,000 Rp 6,500
Bahan Pasir Pasang m3 0.050 Rp 125,000 Rp 6,250
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 35,000 Rp 3,500
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675
4.13 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 3 KP : 10 PP Rp 10,750 Rp 12,075
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp - Rp -
Portland Cement kg 4.500 Rp 1,000 Rp 4,500
Pasir Pasang m3 0.050 Rp 125,000 Rp 6,250
Bahan Kapur padam m3 0.015 Rp - Rp -
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 35,000 Rp 3,500
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675
4.14 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 KP : 1 SM : 1 PP Rp 2,250 Rp 12,075
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp - Rp -
Semen Merah m3 0.018 Rp - Rp -
Pasir Pasang m3 0.018 Rp 125,000 Rp 2,250
Bahan Kapur padam m3 0.018 Rp - Rp -
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 35,000 Rp 3,500
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675
4.15 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 KP : 1 SM : 2 PP Rp 3,500 Rp 12,075
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp - Rp -
Semen Merah m3 0.014 Rp - Rp -
Pasir Pasang m3 0.028 Rp 125,000 Rp 3,500
Bahan Kapur padam m3 0.014 Rp - Rp -
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 35,000 Rp 3,500
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675
4.22 Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 3 PP Rp 18,000 Rp 12,075
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Terawang (roster) Buah 30.000 Rp - Rp -
Portland Cement kg 14.000 Rp 1,000 Rp 14,000
Bahan Pasir Pasang m3 0.032 Rp 125,000 Rp 4,000
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 35,000 Rp 3,500
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675
4.23 Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 4 PP Rp 15,375 Rp 12,075
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Terawang (roster) Buah 30.000 Rp - Rp -
Portland Cement kg 11.000 Rp 1,000 Rp 11,000
Bahan Pasir Pasang m3 0.035 Rp 125,000 Rp 4,375
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 35,000 Rp 3,500
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675
4.24 Memasang 1 m2 dinding bata berongga ekspose ukuran (5 x 11 x 24) cm, campuran spesi 1 PC : 3 PP Rp 18,000 Rp 14,025
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata berongga ekspose Buah 70.000 Rp - Rp -
Portland Cement kg 14.000 Rp 1,000 Rp 14,000
Bahan Pasir Pasang m3 0.032 Rp 125,000 Rp 4,000
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 35,000 Rp 5,250
Kepala tukang OH 0.015 Rp 40,000 Rp 600
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675
V. PEKERJAAN PLESTERAN
SNI DT 91 -0010-2007
Tenaga kerja
Spesialis Infrastruktur NMC PNPM-MPd Page 158 of 289
Menghitung Harga Satuan Pekerjaan
TenagaInfrastruktur
Spesialis kerja NMC PNPM-MPd Page 159 of 289
Menghitung Harga Satuan Pekerjaan
Tenaga kerja
Spesialis Infrastruktur NMC PNPM-MPd Page 160 of 289
Menghitung Harga Satuan Pekerjaan
5.24 Memasang 1 m2 finishing siar pasangan dinding bata merah (=20 m’) Rp 3,108 Rp 7,055
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Portland Cement kg 3.108 Rp 1,000 Rp 3,108
Pekerja OH 0.150 Rp 25,000 Rp 3,750
Tukang batu OH 0.075 Rp 35,000 Rp 2,625
Kepala tukang OH 0.008 Rp 40,000 Rp 320
Tenaga kerja Mandor OH 0.008 Rp 45,000 Rp 360
5.25 Memasang 1 m2 finishing siar pasangan dinding conblock ekspose (=8 m’) Rp 1,600 Rp 3,315
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Portland Cement kg 1.600 Rp 1,000 Rp 1,600
Pekerja OH 0.070 Rp 25,000 Rp 1,750
Tukang batu OH 0.035 Rp 35,000 Rp 1,225
Kepala tukang OH 0.004 Rp 40,000 Rp 160
Tenaga kerja Mandor OH 0.004 Rp 45,000 Rp 180
5.26 Memasang 1 m2 finishing siar pasangan batu kali adukan 1 PC : 2 PP Rp 7,840 Rp 14,025
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 6.340 Rp 1,000 Rp 6,340
Bahan Pasir Pasang m3 0.012 Rp 125,000 Rp 1,500
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 35,000 Rp 5,250
Kepala tukang OH 0.015 Rp 40,000 Rp 600
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675
6.1 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas I Rp - Rp 274,750
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu m3 1.100 Rp - Rp -
Paku 10 cm kg 1.250 Rp - Rp -
Bahan Lem kayu kg 1.000 Rp - Rp -
Pekerja OH 7.000 Rp 25,000 Rp 175,000
Tukang kayu OH 21.000 Rp - Rp -
Kepala tukang OH 2.100 Rp 40,000 Rp 84,000
Tenaga kerja Mandor OH 0.350 Rp 45,000 Rp 15,750
6.2 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III Rp - Rp 235,500
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu m3 1.200 Rp - Rp -
Paku 10 cm kg 1.250 Rp - Rp -
Bahan Lem kayu kg 1.000 Rp - Rp -
Pekerja OH 6.000 Rp 25,000 Rp 150,000
Tukang kayu OH 18.000 Rp - Rp -
Kepala tukang OH 1.800 Rp 40,000 Rp 72,000
Tenaga kerja Mandor OH 0.300 Rp 45,000 Rp 13,500
6.3 Membuat dan memasang 1 m2 pintu klamp standar, kayu kelas II Rp - Rp 13,760
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.040 Rp - Rp -
Bahan Paku 5 cm - 7 cm kg 0.050 Rp - Rp -
Pekerja OH 0.350 Rp 25,000 Rp 8,750
Tukang kayu OH 1.050 Rp - Rp -
Kepala tukang OH 0.105 Rp 40,000 Rp 4,200
Tenaga kerja
6.4 Membuat dan memasang 1 m2 pintu klamp sederhana, kayu kelas III Rp - Rp 13,760
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.040 Rp - Rp -
Bahan Paku 5 cm - 7 cm kg 0.050 Rp - Rp -
Pekerja OH 0.350 Rp 25,000 Rp 8,750
Tukang kayu OH 1.050 Rp - Rp -
Kepala tukang OH 0.105 Rp 40,000 Rp 4,200
Tenaga kerj a Mandor OH 0.018 Rp 45,000 Rp 810
6.5 Membuat dan memasang 1 m2 daun pintu panel, kayu kelas I atau II Rp - Rp 39,250
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.040 Rp - Rp -
Bahan Lem kayu kg 0.500 Rp - Rp -
Pekerja OH 1.000 Rp 25,000 Rp 25,000
Tukang kayu OH 3.000 Rp - Rp -
Kepala tukang OH 0.300 Rp 40,000 Rp 12,000
Tenaga kerja Mandor OH 0.050 Rp 45,000 Rp 2,250
6.6 Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas I atau II Rp - Rp 31,400
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.024 Rp - Rp -
Bahan Lem kayu kg 0.300 Rp - Rp -
Pekerja OH 0.800 Rp 25,000 Rp 20,000
Tukang kayu OH 2.400 Rp - Rp -
Kepala tukang OH 0.240 Rp 40,000 Rp 9,600
Tenaga kerja Mandor OH 0.040 Rp 45,000 Rp 1,800
6.7 Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas I atau II Rp - Rp 39,250
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.064 Rp - Rp -
Bahan Lem kayu kg 0.500 Rp - Rp -
Pekerja OH 1.000 Rp 25,000 Rp 25,000
Tukang kayu OH 3.000 Rp - Rp -
Kepala tukang OH 0.300 Rp 40,000 Rp 12,000
Tenaga kerja Mandor OH 0.050 Rp 45,000 Rp 2,250
6.8 Membuat 1 m2 daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas II (lebar sampai 90 cm) Rp - Rp 27,475
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.025 Rp - Rp -
Paku 1 cm - 2,5 cm kg 0.030 Rp - Rp -
Lem kayu kg 0.500 Rp - Rp -
Plywood tebal 4 mm Ukuran (90 x
Rp -
Bahan 220) cm Lembar 1.000 Rp -
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang kayu OH 2.100 Rp - Rp -
Tenaga kerja
Spesialis Infrastruktur NMC PNPM-MPd Page 163 of 289
Menghitung Harga Satuan Pekerjaan
6.9 Membuat 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II Rp - Rp 31,400
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.026 Rp - Rp -
Paku 1 cm - 2,5 cm kg 0.030 Rp - Rp -
Lem kayu kg 0.500 Rp - Rp -
Plywood tebal 4 mm Ukuran (90 x
Rp -
Bahan 220) cm Lembar 1.000 Rp -
Pekerja OH 0.800 Rp 25,000 Rp 20,000
Tukang kayu OH 2.400 Rp - Rp -
Kepala tukang OH 0.240 Rp 40,000 Rp 9,600
Tenaga kerja Mandor OH 0.040 Rp 45,000 Rp 1,800
6.12 Memasang 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II Rp - Rp 33,385
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.025 Rp - Rp -
Paku 1 cm - 2,5 cm kg 0.030 Rp - Rp -
Lem kayu kg 0.800 Rp - Rp -
Teakwood tebal 4 mm ukuran (90 x Rp -
220) cm Lembar 1.000 Rp -
Bahan Formika Lembar 0.500 Rp - Rp -
Pekerja OH 0.850 Rp 25,000 Rp 21,250
Tukang kayu OH 2.550 Rp - Rp -
Kepala tukang OH 0.255 Rp 40,000 Rp 10,200
Tenaga kerja
6.13 Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter Rp - Rp 157,000
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu m3 1.100 Rp - Rp -
Besi strip tebal 5 mm kg 15.000 Rp - Rp -
Bahan Paku 12 cm kg 5.600 Rp - Rp -
Pekerja OH 4.000 Rp 25,000 Rp 100,000
Tukang kayu OH 12.000 Rp - Rp -
Kepala tukang OH 1.200 Rp 40,000 Rp 48,000
Tenaga kerja Mandor OH 0.200 Rp 45,000 Rp 9,000
6.19 Memasang 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III Rp - Rp 8,325
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kaso-kaso (5 x 7) cm m3 0.015 Rp - 0
Bahan Paku 7 cm – 10 cm kg 0.200 Rp - Rp -
Pekerja OH 0.150 Rp 25,000 Rp 3,750
Tukang kayu OH 0.300 Rp - Rp -
Kepala tukang OH 0.030 Rp 40,000 Rp 1,200
Tenaga kerja Mandor OH 0.075 Rp 45,000 Rp 3,375
6.20 Memasang 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III Rp - Rp 6,650
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kaso-kaso (5 x 7) cm m3 0.016 Rp - Rp -
Bahan Paku 7 cm – 10 cm kg 0.250 Rp - Rp -
Pekerja OH 0.200 Rp 25,000 Rp 5,000
Tukang kayu OH 0.300 Rp - Rp -
Kepala tukang OH 0.030 Rp 40,000 Rp 1,200
Tenaga kerja Mandor OH 0.010 Rp 45,000 Rp 450
6.21 Memasang 1 m1 lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II Rp - Rp 3,525
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.011 Rp - Rp -
Bahan Paku 5 cm dan 7 cm kg 0.100 Rp - Rp -
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.200 Rp - Rp -
Kepala tukang OH 0.020 Rp 40,000 Rp 800
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225
6.22 Memasang 1 m1 lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II Rp - Rp 3,525
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.011 Rp - Rp -
Bahan Paku 5 cm dan 7 cm kg 0.050 Rp - Rp -
Pekerja OH 0.100 Rp 25,000 Rp 2,500
6.23 Memasang 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III Rp - Rp 5,910
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu m3 0.028 Rp - Rp -
Bahan Paku 5 cm dan 7 cm kg 0.150 Rp - Rp -
Pekerja OH 0.150 Rp 25,000 Rp 3,750
Tukang kayu OH 0.450 Rp - Rp -
Kepala tukang OH 0.045 Rp 40,000 Rp 1,800
Tenaga kerja Mandor OH 0.008 Rp 45,000 Rp 360
6.24 Memasang 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II Rp - Rp 5,910
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu, ukuran (6 x 12) cm m3 0.028 Rp - Rp -
Paku 5 cm dan 10 cm kg 0.150 Rp - Rp -
Teakwood tebal 4 mm, Ukuran 120
Rp -
cm x 240 cm Lembar 0.860 Rp -
Bahan Lem kayu kg 0.560 Rp - Rp -
Pekerja OH 0.150 Rp 25,000 Rp 3,750
Tukang kayu OH 0.450 Rp - Rp -
Kepala tukang OH 0.045 Rp 40,000 Rp 1,800
Tenaga kerja Mandor OH 0.008 Rp 45,000 Rp 360
6.25 Memasang 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II Rp - Rp 7,850
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu, ukuran (6 x 12) cm m3 0.028 Rp - Rp -
Paku 5 cm dan 10 cm kg 0.150 Rp - Rp -
Plywood tebal 4 mm, ukuran 120 Rp -
cm x 240 cm Lembar 0.860 Rp -
Bahan Lem kayu kg 0.560 Rp - Rp -
Pekerja OH 0.200 Rp 25,000 Rp 5,000
Tukang kayu OH 0.600 Rp - Rp -
Kepala tukang OH 0.060 Rp 40,000 Rp 2,400
Tenaga kerja Mandor OH 0.010 Rp 45,000 Rp 450
6.27 Memasang 1 m2 dinding lambriziring dari plywood ukuran (120 x 240) cm Rp - Rp 990
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plywood tebal 4 mm Lembar 0.400 Rp - Rp -
Bahan Paku 1 cm dan 2,5 cm kg 0.050 Rp - Rp -
Pekerja OH 0.025 Rp 25,000 Rp 625
Tukang kayu OH 0.075 Rp - Rp -
Kepala tukang OH 0.008 Rp 40,000 Rp 320
Tenaga kerja Mandor OH 0.001 Rp 45,000 Rp 45
6.28 Memasang 1 m2 dinding bilik, rangka kayu kelas III atau IV Rp - Rp 2,925
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bilik bambu m2 1.500 Rp - Rp -
Kaso-kaso (5 x 7) cm m3 0.014 Rp - Rp -
Paku kg 0.012 Rp - Rp -
Bahan List kayu 2/4 m3 0.003 Rp - Rp -
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.050 Rp - Rp -
Kepala tukang OH 0.005 Rp 40,000 Rp 200
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225
7.1 Memasang 1 m2 lantai ubin PC abu-abu ukuran (40 x 40) cm Rp 15,425 Rp 11,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin abu-abu Buah 6.630 Rp - Rp -
Portland Cement kg 9.800 Rp 1,000 Rp 9,800
Bahan Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Pekerja OH 0.250 Rp 25,000 Rp 6,250
Tukang batu OH 0.125 Rp 35,000 Rp 4,375
Kepala tukang OH 0.013 Rp 40,000 Rp 520
Tenaga kerja Mandor OH 0.013 Rp 45,000 Rp 585
7.2 Memasang 1 m2 lantai ubin PC abu-abu ukuran (30 x 30) cm Rp 15,625 Rp 12,155
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin abu-abu Buah 11.870 Rp - Rp -
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Bahan Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Pekerja OH 0.260 Rp 25,000 Rp 6,500
Tukang batu OH 0.130 Rp 35,000 Rp 4,550
Kepala tukang OH 0.013 Rp 40,000 Rp 520
Tenaga kerja Mandor OH 0.013 Rp 45,000 Rp 585
7.3 Memasang 1 m2 lantai ubin PC abu-abu ukuran (20 x 20) cm Rp 16,025 Rp 12,665
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin abu-abu Buah 26.500 Rp - Rp -
Bahan
Spesialis Infrastruktur NMC PNPM-MPd Page 168 of 289
Menghitung Harga Satuan Pekerjaan
7.4 Memasang 1 m2 lantai ubin warna ukuran (40 x 40) cm Rp 15,425 Rp 11,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin warna Buah 6.630 Rp - Rp -
Portland Cement kg 9.800 Rp 1,000 Rp 9,800
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 1.300 Rp - Rp -
Pekerja OH 0.250 Rp 25,000 Rp 6,250
Tukang batu OH 0.125 Rp 35,000 Rp 4,375
Kepala tukang OH 0.013 Rp 40,000 Rp 520
Tenaga kerja Mandor OH 0.013 Rp 45,000 Rp 585
7.5 Memasang 1 m2 lantai ubin warna ukuran (30 x 30) cm Rp 15,625 Rp 12,155
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin warna Buah 11.870 Rp - Rp -
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 1.500 Rp - Rp -
Pekerja OH 0.260 Rp 25,000 Rp 6,500
Tukang batu OH 0.130 Rp 35,000 Rp 4,550
Kepala tukang OH 0.013 Rp 40,000 Rp 520
Tenaga kerja Mandor OH 0.013 Rp 45,000 Rp 585
7.6 Memasang 1 m2 lantai ubin warna ukuran (20 x 20) cm Rp 16,025 Rp 12,665
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin warna Buah 26.500 Rp - Rp -
Portland Cement kg 10.400 Rp 1,000 Rp 10,400
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 1.620 Rp - Rp -
Pekerja OH 0.270 Rp 25,000 Rp 6,750
Tukang batu OH 0.135 Rp 35,000 Rp 4,725
Kepala tukang OH 0.014 Rp 40,000 Rp 560
Tenaga kerja Mandor OH 0.014 Rp 45,000 Rp 630
7.7 Memasang 1 m2 lantai ubin teraso ukuran (40 x 40) cm Rp 15,425 Rp 11,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teraso Buah 6.630 Rp - Rp -
Portland Cement kg 9.800 Rp 1,000 Rp 9,800
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 1.300 Rp - Rp -
Pekerja OH 0.250 Rp 25,000 Rp 6,250
7.8 Memasang 1 m2 lantai ubin teraso ukuran (30 x 30) cm Rp 15,625 Rp 12,155
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teraso Buah 11.870 Rp - Rp -
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 1.500 Rp - Rp -
Pekerja OH 0.260 Rp 25,000 Rp 6,500
Tukang batu OH 0.130 Rp 35,000 Rp 4,550
Kepala tukang OH 0.013 Rp 40,000 Rp 520
Tenaga kerja Mandor OH 0.013 Rp 45,000 Rp 585
7.9 Memasang 1 m2 lantai ubin granit ukuran (40 x 40) cm Rp 15,425 Rp 11,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin granit Buah 6.630 Rp - Rp -
Portland Cement kg 9.800 Rp 1,000 Rp 9,800
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 1.300 Rp - Rp -
Pekerja OH 0.250 Rp 25,000 Rp 6,250
Tukang batu OH 0.125 Rp 35,000 Rp 4,375
Kepala tukang OH 0.013 Rp 40,000 Rp 520
Tenaga kerja Mandor OH 0.013 Rp 45,000 Rp 585
7.10 Memasang 1 m2 lantai ubin granit ukuran (30 x 30) cm Rp 15,625 Rp 12,155
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin granit Buah 11.870 Rp - Rp -
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 1.500 Rp - Rp -
Pekerja OH 0.260 Rp 25,000 Rp 6,500
Tukang batu OH 0.130 Rp 35,000 Rp 4,550
Kepala tukang OH 0.013 Rp 40,000 Rp 520
Tenaga kerja Mandor OH 0.013 Rp 45,000 Rp 585
7.11 Memasang 1 m2 lantai ubin teralux ukuran (40 x 40) cm Rp 15,425 Rp 11,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teralux kerang Buah 6.630 Rp - Rp -
Portland Cement kg 9.800 Rp 1,000 Rp 9,800
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 1.300 Rp - Rp -
Pekerja OH 0.250 Rp 25,000 Rp 6,250
Tukang batu OH 0.125 Rp 35,000 Rp 4,375
Kepala tukang OH 0.013 Rp 40,000 Rp 520
Tenaga kerja Mandor OH 0.013 Rp 45,000 Rp 585
7.12 Memasang 1 m2 lantai ubin teralux ukuran (30 x 30) cm Rp 15,625 Rp 12,155
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teralux kerang Buah 11.870 Rp - Rp -
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 1.500 Rp - Rp -
Pekerja OH 0.260 Rp 25,000 Rp 6,500
Tukang batu OH 0.130 Rp 35,000 Rp 4,550
Kepala tukang OH 0.013 Rp 40,000 Rp 520
Tenaga kerja Mandor OH 0.013 Rp 45,000 Rp 585
7.13 Memasang 1 m2 lantai ubin teralux marmer ukuran (60 x 60) cm Rp 15,225 Rp 11,220
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teralux marmer Buah 3.100 Rp - Rp -
Portland Cement kg 9.600 Rp 1,000 Rp 9,600
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 1.500 Rp - Rp -
Pekerja OH 0.240 Rp 25,000 Rp 6,000
Tukang batu OH 0.120 Rp 35,000 Rp 4,200
Kepala tukang OH 0.012 Rp 40,000 Rp 480
Tenaga kerja Mandor OH 0.012 Rp 45,000 Rp 540
7.14 Memasang 1 m2 lantai ubin teralux marmer ukuran (40 x 40) cm Rp 15,425 Rp 11,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teralux marmer Buah 6.630 Rp - Rp -
Portland Cement kg 9.800 Rp 1,000 Rp 9,800
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 1.300 Rp - Rp -
Pekerja OH 0.250 Rp 25,000 Rp 6,250
Tukang batu OH 0.125 Rp 35,000 Rp 4,375
Kepala tukang OH 0.013 Rp 40,000 Rp 520
Tenaga kerja Mandor OH 0.013 Rp 45,000 Rp 585
7.15 Memasang 1 m2 lantai ubin teralux marmer ukuran (30 x 30) cm Rp 15,625 Rp 12,155
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teralux marmer Buah 11.870 Rp - Rp -
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 1.500 Rp - Rp -
Pekerja OH 0.260 Rp 25,000 Rp 6,500
Tukang batu OH 0.130 Rp 35,000 Rp 4,550
Kepala tukang OH 0.013 Rp 40,000 Rp 520
Tenaga kerja Mandor OH 0.013 Rp 45,000 Rp 585
7.16 Memasang 1 m plint ubin PC abu-abu ukuran (15 x 20) cm Rp 2,150 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
7.17 Memasang 1 m plint ubin PC abu-abu ukuran (10 x 30) cm Rp 1,615 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint Ubin Buah 3.530 Rp - Rp -
Portland Cement kg 1.240 Rp 1,000 Rp 1,240
Bahan Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225
7.18 Memasang 1 m plint ubin PC abu-abu ukuran (10 x 40) cm Rp 1,615 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint Ubin Buah 2.650 Rp - Rp -
Portland Cement kg 1.240 Rp 1,000 Rp 1,240
Bahan Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225
7.19 Memasang 1 m plint ubin PC warna ukuran (10 x 20) cm Rp 1,515 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin PC warna Buah 5.300 Rp - Rp -
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Bahan Semen warna kg 0.100 Rp - Rp -
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225
7.20 Memasang 1 m plint ubin PC warna ukuran (10 x 30) cm Rp 1,515 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin PC warna Buah 3.530 Rp - Rp -
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Bahan Semen warna kg 0.100 Rp - Rp -
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Tenaga kerja
Spesialis Infrastruktur NMC PNPM-MPd Page 172 of 289
Menghitung Harga Satuan Pekerjaan
7.21 Memasang 1 m plint ubin PC warna ukuran (10 x 40) cm Rp 1,515 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin PC warna Buah 2.650 Rp - Rp -
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Bahan Semen warna kg 0.100 Rp - Rp -
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225
7.22 Memasang 1 m plint ubin teraso ukuran (10 x 30) cm Rp 1,515 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teraso Buah 3.530 Rp - Rp -
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Bahan Semen warna kg 0.100 Rp - Rp -
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225
7.23 Memasang 1 m plint ubin teraso ukuran (10 x 40) cm Rp 1,515 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teraso Buah 2.650 Rp - Rp -
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Bahan Semen warna Kg 0.100 Rp - Rp -
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225
7.24 Memasang 1 m plint ubin granit ukuran (10 x 40) cm Rp 1,515 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin granit Buah 2.650 Rp - Rp -
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Bahan Semen warna kg 0.100 Rp - Rp -
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225
7.25 Memasang 1 m plint ubin granit ukuran (10 x 30) cm Rp 1,515 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin granit Buah 3.530 Rp - Rp -
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Bahan Semen warna kg 0.100 Rp - Rp -
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225
7.26 Memasang 1 m plint ubin teralux kerang ukuran (10 x 40) cm Rp 1,515 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teralux kerang Buah 2.650 Rp - Rp -
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Bahan Semen warna kg 0.100 Rp - Rp -
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225
7.27 Memasang 1 m plint ubin teralux kerang ukuran (10 x 30) cm Rp 1,515 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teralux kerang Buah 3.530 Rp - Rp -
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Bahan Semen warna Kg 0.100 Rp - Rp -
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225
7.28 Memasang 1 m plint ubin teralux marmer ukuran (10 x 60) cm Rp 1,515 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teralux marmer Buah 1.700 Rp - Rp -
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Bahan Semen warna kg 0.100 Rp - Rp -
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225
7.29 Memasang 1 m plint ubin teralux marmer ukuran (10 x 40) cm Rp 1,515 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teralux marmer Buah 2.650 Rp - Rp -
7.30 Memasang 1 m plint ubin teralux marmer ukuran (10 x 30) cm Rp 1,515 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teralux marmer Buah 3.530 Rp - Rp -
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Bahan Semen warna kg 0.100 Rp - Rp -
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225
7.32 Memasang 1 m2 lantai keramik artistik ukuran (10 x 20) cm Rp 13,815 Rp 32,725
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin keramik artistik Buah 53.000 Rp - Rp -
Portland Cement kg 8.190 Rp 1,000 Rp 8,190
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 2.750 Rp - Rp -
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang batu OH 0.350 Rp 35,000 Rp 12,250
Kepala tukang OH 0.035 Rp 40,000 Rp 1,400
Tenaga kerja Mandor OH 0.035 Rp 45,000 Rp 1,575
7.33 Memasang 1 m2 lantai keramik artistik ukuran (10 x 10) cm atau (5 x 20) cm Rp 13,815 Rp 32,725
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin keramik artistik Buah 106.000 Rp - Rp -
Portland Cement kg 8.190 Rp 1,000 Rp 8,190
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 3.200 Rp - Rp -
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang batu OH 0.350 Rp 35,000 Rp 12,250
Kepala tukang OH 0.035 Rp 40,000 Rp 1,400
Tenaga kerja
7.37 Memasang 1 m2 lantai keramik ukuran (10 x 33) cm, variasi/border Rp 15,425 Rp 49,130
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin keramik Buah 33.000 Rp - Rp -
Portland Cement kg 9.800 Rp 1,000 Rp 9,800
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 4.370 Rp - Rp -
Pekerja OH 1.050 Rp 25,000 Rp 26,250
Tukang batu OH 0.525 Rp 35,000 Rp 18,375
Kepala tukang OH 0.053 Rp 40,000 Rp 2,120
Tenaga kerja Mandor OH 0.053 Rp 45,000 Rp 2,385
7.38 Memasang 1 m2 lantai mosaik ukuran (30 x 30) cm, campuran spesi 1 PC : 3 PP Rp 19,025 Rp 32,725
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Mosaik Buah 11.870 Rp - Rp -
Portland Cement kg 14.150 Rp 1,000 Rp 14,150
Pasir Pasang m3 0.039 Rp 125,000 Rp 4,875
Bahan Semen warna kg 2.000 Rp - Rp -
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang batu OH 0.350 Rp 35,000 Rp 12,250
Kepala tukang OH 0.035 Rp 40,000 Rp 1,400
Tenaga kerja Mandor OH 0.035 Rp 45,000 Rp 1,575
7.42 Memasang 1 m’ plint internal cove artistik ukuran (5 x 5 x 20) cm Rp 1,515 Rp 49,710
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Internal cove Buah 5.300 Rp - Rp -
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Bahan
Spesialis Infrastruktur NMC PNPM-MPd Page 177 of 289
Menghitung Harga Satuan Pekerjaan
Gymfloor m2 1.050 Rp - Rp -
Bahan Lem kg 0.600 Rp - Rp -
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang kayu OH 0.350 Rp - Rp -
Kepala tukang OH 0.035 Rp 40,000 Rp 1,400
Tenaga kerja Mandor OH 0.035 Rp 45,000 Rp 1,575
7.51 Memasang 1 m2 dinding keramik artistik ukuran (10 x 20) cm Rp 11,550 Rp 42,075
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Keramik artistik Buah 53.000 Rp - Rp -
Portland Cement kg 9.300 Rp 1,000 Rp 9,300
Pasir Pasang m3 0.018 Rp 125,000 Rp 2,250
Bahan Semen warna kg 2.750 Rp - Rp -
Pekerja OH 0.900 Rp 25,000 Rp 22,500
Tukang OH 0.175 Rp - Rp -
Kepala tukang OH 0.017 Rp 40,000 Rp 680
Tenaga kerja Mandor OH 0.002 Rp 45,000 Rp 90
7.62 Memasang 1 m plint vinyil karet ukuran (30 x 30) cm dengan perekat Rp - Rp 2,500
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Vinyl karet Buah 1.760 Rp - Rp -
Bahan Lem vinyl kg 0.080 Rp - Rp -
Pekerja OH 0.080 Rp 25,000 Rp 2,000
Tukang OH 0.080 Rp - Rp -
Kepala tukang OH 0.008 Rp 40,000 Rp 320
Tenaga kerja Mandor OH 0.004 Rp 45,000 Rp 180
8.1 Memasang 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm Rp - Rp 1,210
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes semen m2 1.100 Rp - Rp -
Bahan Paku tripleks kg 0.010 Rp - Rp -
Pekerja OH 0.030 Rp 25,000 Rp 750
Tukang kayu OH 0.070 Rp - Rp -
Kepala tukang OH 0.007 Rp 40,000 Rp 280
Tenaga kerja Mandor OH 0.004 Rp 45,000 Rp 180
8.5 Memasang 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm dan 6 mm Rp - Rp 3,125
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Tripleks Lembar 0.375 Rp - Rp -
Bahan Paku tripleks kg 0.030 Rp - Rp -
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.100 Rp - Rp -
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225
8.7 Memasang 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm Rp - Rp 2,925
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Gypsum board Lembar 0.364 Rp - Rp -
Bahan Paku skrup kg 0.110 Rp - Rp -
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.050 Rp - Rp -
Tenaga kerja
Spesialis Infrastruktur NMC PNPM-MPd Page 183 of 289
Menghitung Harga Satuan Pekerjaan
8.9 Memasang 1 m2 langit-langit akustik ukuran (60 x 120) cm + rangka alluminium Rp - Rp 15,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Profil Alluminium "T" m’ 3.600 Rp - Rp -
Kawat diameter 4 mm kg 0.150 Rp - Rp -
Ramset Buah 1.050 Rp - Rp -
Bahan Akustik Ukuran 60 cm x 120 cm Lembar 1.500 Rp - Rp -
Pekerja OH 0.500 Rp 25,000 Rp 12,500
Tukang besi OH 0.500 Rp - Rp -
Kepala tukang OH 0.050 Rp 40,000 Rp 2,000
Tenaga kerja Mandor OH 0.025 Rp 45,000 Rp 1,125
9.4 Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku Rp - Rp 32,790
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Besi siku L 30.30.3 kg 15.000 Rp - Rp -
Besi plat baja kg 32.800 Rp - Rp -
Bahan kawat las kg 0.050 Rp - Rp -
Pekerja OH 1.050 Rp 25,000 Rp 26,250
Tukang besi OH 1.050 Rp - Rp -
Kepala tukang OH 0.105 Rp 40,000 Rp 4,200
Tenaga kerja Mandor OH 0.052 Rp 45,000 Rp 2,340
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Pintu gulung besi m2 1.000 Rp - Rp -
Pekerja OH 1.200 Rp 25,000 Rp 30,000
Tukang besi OH 1.200 Rp - Rp -
Kepala tukang OH 0.120 Rp 40,000 Rp 4,800
Tenaga kerja Mandor OH 0.006 Rp 45,000 Rp 270
Tenaga kerja
Spesialis Infrastruktur NMC PNPM-MPd Page 186 of 289
Menghitung Harga Satuan Pekerjaan
9.19 Memasang 1 m’ talang 1/2 lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm Rp - Rp 5,310
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Seng plat m 1.050 Rp - Rp -
Paku 1 cm - 2,5 cm kg 0.010 Rp - Rp -
Bahan Besi strip kg 0.500 Rp - Rp - Rp -
Pekerja OH 0.150 Rp 25,000 Rp 3,750
Tukang besi OH 0.300 Rp - Rp -
Kepala tukang OH 0.030 Rp 40,000 Rp 1,200
Tenaga kerja Mandor OH 0.008 Rp 45,000 Rp 360
10.8 1m' Pasang Atap Asbes Gelombang ( 2.50 x 0.92 m ) X 5mm Rp - Rp 4,180
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
10.9 1m' Pasang Atap Asbes Gelombang ( 2.25 x 0.92 m ) X 5mm Rp - Rp 4,180
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.600 Rp - Rp -
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp - Rp -
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.075 Rp - Rp -
Kepala tukang Oh 0.008 Rp 40,000 Rp 320
Tenaga Mandor Oh 0.008 Rp 45,000 Rp 360
10.10 1m' Pasang Atap Asbes Gelombang ( 2.00 x 0.92 m ) X 5mm Rp - Rp 4,095
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.600 Rp - Rp -
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp - Rp -
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.070 Rp - Rp -
Kepala tukang Oh 0.007 Rp 40,000 Rp 280
Tenaga Mandor Oh 0.007 Rp 45,000 Rp 315
10.11 1m' Pasang Atap Asbes Gelombang ( 1.80 x 0.92 m ) X 5mm Rp - Rp 4,095
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.750 Rp - Rp -
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp - Rp -
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.070 Rp - Rp -
Kepala tukang Oh 0.007 Rp 40,000 Rp 280
Tenaga Mandor Oh 0.007 Rp 45,000 Rp 315
10.12 1m² Pasang Atap Asbes Gelombang ( 300 x 1.05 m ) X 4mm Rp - Rp 4,095
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.350 Rp - Rp -
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp - Rp -
Tenaga Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.070 Rp - Rp -
Kepala tukang Oh 0.007 Rp 40,000 Rp 280
Mandor Oh 0.007 Rp 45,000 Rp 315
10.13 1m² Pasang Atap Asbes Gelombang ( 270 x 1.05 m ) X 4mm Rp - Rp 4,095
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.420 Rp - Rp -
Bahan
10.14 1m² Pasang Atap Asbes Gelombang ( 240 x 1.05 m ) X 4mm Rp - Rp 4,095
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.440 Rp - Rp -
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp - Rp -
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp - Rp -
Kepala tukang Oh 0.007 Rp 40,000 Rp 280
Tenaga Mandor Oh 0.007 Rp 45,000 Rp 315
10.15 1m² Pasang Atap Asbes Gelombang ( 210 x 1.05 m ) X 4mm Rp - Rp 4,095
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.510 Rp - Rp -
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp - Rp -
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp - Rp -
Kepala tukang Oh 0.007 Rp 40,000 Rp 280
Tenaga Mandor Oh 0.007 Rp 45,000 Rp 315
10.16 1m² Pasang Atap Asbes Gelombang ( 1.5 x 1.05 m ) X 4mm Rp - Rp 4,095
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.800 Rp - Rp -
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp - Rp -
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp - Rp -
Kepala tukang Oh 0.007 Rp 40,000 Rp 280
Tenaga Mandor Oh 0.007 Rp 45,000 Rp 315
10.17 1m² Pasang Atap Asbes Gelombang ( 3.00 x 1.08 m ) X 6mm Rp - Rp 4,095
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.370 Rp - Rp -
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp - Rp -
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp - Rp -
Kepala tukang Oh 0.007 Rp 40,000 Rp 280
Tenaga Mandor Oh 0.007 Rp 45,000 Rp 315
10.18 1m² Pasang Atap Asbes Gelombang ( 2.7 x 1.08 m ) X 6mm Rp - Rp 4,095
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.380 Rp - Rp -
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp - Rp -
10.19 1m² Pasang Atap Asbes Gelombang ( 2.4 x 1.08 m ) X 6mm Rp - Rp 4,095
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.460 Rp - Rp -
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp - Rp -
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp - Rp -
Kepala tukang Oh 0.007 Rp 40,000 Rp 280
Tenaga Mandor Oh 0.007 Rp 45,000 Rp 315
10.20 1m² Pasang Atap Asbes Gelombang ( 2.1 x 1.08 m ) X 6mm Rp - Rp 4,095
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.490 Rp - Rp -
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp - Rp -
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp - Rp -
Kepala tukang Oh 0.007 Rp 40,000 Rp 280
Tenaga Mandor Oh 0.007 Rp 45,000 Rp 315
10.21 1m² Pasang Atap Asbes Gelombang ( 1.80 x 1.08 m ) X 6mm Rp - Rp 4,095
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.570 Rp - Rp -
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp - Rp -
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp - Rp -
Kepala tukang Oh 0.007 Rp 40,000 Rp 280
Tenaga Mandor Oh 0.007 Rp 45,000 Rp 315
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Nok standar 40 cm 18, swg 22 m2 1.200 Rp - Rp -
Bahan Paku Hak Pnjang 15 cm Kg 0.040 Rp - Rp -
Pekerja Oh 0.100 Rp 25,000 Rp 2,500
Tukang kayu Oh 1.000 Rp - Rp -
Kepala tukang Oh 0.010 Rp 40,000 Rp 400
Tenaga Mandor Oh 0.010 Rp 45,000 Rp 450
11.6 Memasang 1 buah Bak Mandi Teraso, volume 0.30 m³ Rp 1,250 Rp 86,500
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bak Teraso bh 1.000 Rp - Rp -
Semen Portland Kg 6.000 Rp - Rp -
Bahan Pasir Pasang m3 0.010 Rp 125,000 Rp 1,250
Pekerja Oh 2.100 Rp 25,000 Rp 52,500
Tukang batu Oh 0.750 Rp 35,000 Rp 26,250
Kepala tukang Oh 0.070 Rp 40,000 Rp 2,800
Tenaga Mandor Oh 0.110 Rp 45,000 Rp 4,950
11.8 Memasang 1 buah Bak Mandi Batu bata, volume 0.30 m³ Rp 37,500 Rp 280,500
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah m3 0.400 Rp - Rp -
Semen Portland Kg 120.000 Rp - Rp -
Pasir Pasang m3 0.300 Rp 125,000 Rp 37,500
Porselen ( 11 x 11 ) cm bh 360.000 Rp - Rp -
Bahan Semen Nat Kg 6.000 Rp - Rp -
Pekerja Oh 6.000 Rp 25,000 Rp 150,000
Tukang batu Oh 3.000 Rp 35,000 Rp 105,000
Kepala tukang Oh 0.300 Rp 40,000 Rp 12,000
Tenaga Mandor Oh 0.300 Rp 45,000 Rp 13,500
11.11 Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa Tanah Ø15 cm Rp 1,625 Rp 2,783
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa Tanah bh 1.600 Rp - Rp -
Semen Portland Kg 0.680 Rp - Rp -
Pasir Pasang m3 0.013 Rp 125,000 Rp 1,625
Bahan Pasir Urug m3 0.011 Rp - Rp -
Pekerja Oh 0.060 Rp 25,000 Rp 1,500
Tukang batu Oh 0.030 Rp 35,000 Rp 1,050
Kepala tukang Oh 0.003 Rp 40,000 Rp 120
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 113
11.12 Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa Tanah Ø 20 cm Rp 1,750 Rp 3,875
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa Tanah bh 1.600 Rp - Rp -
Semen Portland Kg 0.870 Rp - Rp -
Pasir Pasang m3 0.014 Rp 125,000 Rp 1,750
Bahan
11.15 Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t = 35cm Rp 8,750 Rp 116,305
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah m3 0.145 Rp - Rp -
Semen Portland Kg 44.000 Rp - Rp -
Pasir Pasang m3 0.070 Rp 125,000 Rp 8,750
Batu Kerikil m3 0.070 Rp - Rp -
Besi beton Kg 1.600 Rp - Rp -
Bahan Pasir beton m3 0.060 Rp - Rp -
Pekerja Oh 3.200 Rp 25,000 Rp 80,000
Tukang batu Oh 1.015 Rp 35,000 Rp 35,525
Kepala tukang Oh 0.002 Rp 40,000 Rp 60
Tenaga Mandor Oh 0.016 Rp 45,000 Rp 720
11.16 Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50cm Rp 16,250 Rp 57,130
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah m3 0.250 Rp - Rp -
Semen Portland Kg 77.000 Rp - Rp -
11.17 Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (60 x 60 )cm, t = 65cm Rp 23,000 Rp 86,940
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah m3 0.371 Rp - Rp -
Semen Portland Kg 114.000 Rp - Rp -
Pasir Pasang m3 0.184 Rp 125,000 Rp 23,000
Batu Koral m3 0.033 Rp - Rp -
Besi beton Kg 4.850 Rp - Rp -
Bahan Pasir beton m3 0.120 Rp - Rp -
Pekerja Oh 2.160 Rp 25,000 Rp 54,000
Tukang batu Oh 0.720 Rp 35,000 Rp 25,200
Kepala tukang Oh 0.072 Rp 40,000 Rp 2,880
Mandor Oh 0.108 Rp 45,000 Rp 4,860
Tenaga Tukang Gali Oh 0.100 Rp - Rp -
Tenaga
Spesialis Infrastruktur NMC PNPM-MPd Page 201 of 289
Menghitung Harga Satuan Pekerjaan
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa PVC tipe AW Ø 4" m' 1.200 Rp - Rp - Rp -
Bahan Perlengkapan Rp -
Pekerja Oh 0.081 Rp 25,000 Rp 2,025
Tukang batu Oh 0.135 Rp 35,000 Rp 4,725
Kepala tukang Oh 0.014 Rp 40,000 Rp 540
Tenaga Mandor Oh 0.004 Rp 45,000 Rp 185
PT. T-30.2000-C
12.1 1 Buah Pasang kunci Tanam Antik Rp - Rp 4,035
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan kunci Tanam Antik Bh 1.000 Rp - Rp -
Pekerja Oh 0.060 Rp 25,000 Rp 1,500
Tukang kayu Oh 0.600 Rp - Rp -
Kepala tukang Oh 0.060 Rp 40,000 Rp 2,400
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 135
Spesialis
TenagaInfrastruktur NMC PNPM-MPd Page 205 of 289
Menghitung Harga Satuan Pekerjaan
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kaca Patri m2 1.100 Rp - Rp -
Pekerja Oh 0.015 Rp 25,000 Rp 375
Tukang kayu Oh 0.150 Rp - Rp -
Kepala tukang Oh 0.015 Rp 40,000 Rp 600
Tenaga Mandor Oh 0.001 Rp 45,000 Rp 34
13.2 1 m² Mencuci Bidang Permukaan Tembok yang Pernah dicat Rp 3,750 Rp 113
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Sabun Kg 0.050 Rp - Rp -
Pekerja Oh 0.150 Rp 25,000 Rp 3,750
Tukang Cat Oh Rp - Rp -
Kepala tukang Oh Rp 40,000 Rp -
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 113
13.3 1 m² Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual Rp - Rp 3,863
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Sabun Kg 0.050 Rp - Rp -
Pekerja Oh 0.150 Rp 25,000 Rp 3,750
Tukang Cat Oh Rp - Rp -
Kepala tukang Oh Rp 40,000 Rp -
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 113
13.5 1 m² Mengerok Karat atau Cat Lama Permukaan Baja dgn Pancar Pasir ( Sanblasting ) dgn Tingkat Kebersihan Sa 2½. Rp - Rp 94,500
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pasir Silika Kg 40.000 Rp - Rp -
Spesialis
Bahan Infrastruktur NMC PNPM-MPd Page 209 of 289
Menghitung Harga Satuan Pekerjaan
13.8 1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup Rp - Rp 2,103
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Cat Meni Kg 0.200 Rp - Rp -
Plamir Kg 0.150 Rp - Rp -
Cat Dasar Kg 0.170 Rp - Rp -
Bahan Cat Kayu glotek Kg 0.260 Rp - Rp -
Pekerja Oh 0.070 Rp 25,000 Rp 1,750
Tukang Cat Oh 0.009 Rp - Rp -
Kepala tukang Oh 0.006 Rp 40,000 Rp 240
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 113
13.9 1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup Rp - Rp 2,023
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Cat Meni Kg 0.200 Rp - Rp -
Plamir Kg 0.150 Rp - Rp -
Cat Dasar Kg 0.170 Rp - Rp -
Bahan Cat Kayu glotek Kg 0.350 Rp - Rp -
Pekerja Oh 0.070 Rp 25,000 Rp 1,750
Tukang Cat Oh 0.105 Rp - Rp -
Tenaga
Spesialis Infrastruktur NMC PNPM-MPd Page 210 of 289
Menghitung Harga Satuan Pekerjaan
13.12 1 m² Pelaburan Bidang Kayu dengan Cat Residu dan Ter Rp - Rp 2,770
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Residu atau Ter Ltr 0.350 Rp - Rp -
Pekerja Oh 0.100 Rp 25,000 Rp 2,500
Tukang Cat Oh Rp - Rp -
Kepala tukang Oh Rp 40,000 Rp -
Tenaga Mandor Oh 0.006 Rp 45,000 Rp 270
13.14 1 m² Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) Rp - Rp 865
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plamir Kg 0.100 Rp - Rp -
Cat Dasar Kg 0.100 Rp - Rp -
Bahan Cat Tembok Kg 0.260 Rp - Rp -
Pekerja Oh 0.020 Rp 25,000 Rp 500
Spesialis
TenagaInfrastruktur NMC PNPM-MPd Page 211 of 289
Menghitung Harga Satuan Pekerjaan
13.16 1 m² Melabur Tembok Lama dengan Kapur Sirih ( untuk pemeliharaan ) Rp - Rp 1,133
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Perancah Kayu m3 0.002 Rp - Rp -
Bahan Kapur Sirih Kg 0.300 Rp - Rp -
Pekerja Oh 0.040 Rp 25,000 Rp 1,000
Tukang Cat Oh 0.005 Rp - Rp -
Kepala tukang Oh 0.001 Rp 40,000 Rp 20
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 113
13.19 1 m² Pengecatan Permukaan Baja dengan Meni Besi dan Perancah Rp - Rp 7,488
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Meni Besi Kg 0.100 Rp - Rp -
Kuas Bh 0.010 Rp - Rp -
Bahan Perancah Kayu m3 0.002 Rp - Rp -
13.20 1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 4 Lapis Cat Konvensional, tebal 200 um Rp - Rp 1,388
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Meni ( Read Lead ) A Kg 0.100 Rp - Rp -
Meni ( Read Lead ) B Kg 0.100 Rp - Rp -
Alluminium C Kg 0.040 Rp - Rp -
Alluminium B Kg 0.040 Rp - Rp -
Pengencer Ltr 0.010 Rp - Rp -
Bahan Perancah Kayu m3 0.002 Rp - Rp -
Pekerja Oh 0.006 Rp 25,000 Rp 150
Tukang Cat Oh 0.006 Rp - Rp -
Kepala tukang Oh 0.023 Rp 40,000 Rp 900
Tenaga Mandor Oh 0.008 Rp 45,000 Rp 338
13.21 1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 1 Lapis Cat Mutakhir, tebal 200 um Rp - Rp 900
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Meni Besi Kg 0.300 Rp - Rp -
Pekerja Oh 0.006 Rp 25,000 Rp 150
Tukang Cat Oh 0.060 Rp - Rp -
Kepala tukang Oh 0.012 Rp 40,000 Rp 480
Tenaga Mandor Oh 0.006 Rp 45,000 Rp 270
13.22 1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 3 Lapis Cat Konvensional, tebal 200 um Rp - Rp 33,500
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Cat Dasar Kg 0.110 Rp - Rp -
Cat Antara Kg 0.170 Rp - Rp -
Bahan Cat Penutup Kg 0.080 Rp - Rp -
Pekerja Oh 0.500 Rp 25,000 Rp 12,500
Tukang Cat Oh 0.800 Rp - Rp -
Kepala tukang Oh 0.300 Rp 40,000 Rp 12,000
Tenaga Mandor Oh 0.200 Rp 45,000 Rp 9,000
13.23 1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Semprot ( Airless Spray ) dgn Sistem 1 Lapis Cat Mutakhir, tebal 200 u Rp - Rp 27,000
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Cat Dasar Kg 0.300 Rp - Rp -
Pekerja Oh 0.400 Rp 25,000 Rp 10,000
Tukang Cat Oh 0.700 Rp - Rp -
Kepala tukang Oh 0.200 Rp 40,000 Rp 8,000
Tenaga Mandor Oh 0.200 Rp 45,000 Rp 9,000
RSNI. T-15-2002
14.1 1 m' Pagar Sementara dari Kayu tinggi 2 m Rp - Rp 11,700
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Dolken Kayu Ø 8 - 10/400 cm btg 1.250 Rp - Rp -
Semen Portland Kg 2.500 Rp - Rp -
Pasir beton m3 0.005 Rp - Rp -
Bahan Koral Beton m3 0.009 Rp - Rp -
Kaso 5 / 7 ( albasiah ) m3 0.072 Rp - Rp -
Paku Biasa 2" - 5" Kg 0.060 Rp - Rp -
Residu Lt 0.400 Rp - Rp -
Tukang kayu Oh 0.200 Rp - Rp -
Pekerja Oh 0.400 Rp 25,000 Rp 10,000
Tenaga
Kepala tukang Oh 0.020 Rp 40,000 Rp 800
Mandor Oh 0.020 Rp 45,000 Rp 900
14.3 1 m' Pagar Sementara dari Kawat Duri tinggi 1.8 m Rp - Rp 9,200
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Dolken Kayu Ø 8 - 10/400 cm btg 1.000 Rp - Rp -
Semen Portland Kg 2.000 Rp - Rp -
Kawat Duri Kg 25.000 Rp - Rp -
Pasir beton m3 0.005 Rp - Rp -
Koral Beton m3 0.009 Rp - Rp -
Bahan Paku Biasa 2" - 5" Kg 0.060 Rp - Rp -
Tukang kayu Oh 0.200 Rp - Rp -
Pekerja Oh 0.300 Rp 25,000 Rp 7,500
Kepala tukang Oh 0.020 Rp 40,000 Rp 800
Tenaga Mandor Oh 0.020 Rp 45,000 Rp 900
Bahan
Spesialis Infrastruktur NMC PNPM-MPd Page 214 of 289
Menghitung Harga Satuan Pekerjaan
14.5 1 m² Pek. Kantor Direksi Keet , dengan lantai plesteran Rp 18,750 Rp 99,250
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Dolken Kayu Ø 8 - 10/400 cm btg 1.250 Rp - Rp -
Kayu Balok Borneo m3 0.180 Rp - Rp -
Paku Kg 0.850 Rp - Rp -
Besi Strip Kg 1.100 Rp - Rp -
Semen Portland Kg 35.000 Rp - Rp -
Pasir Pasang m3 0.150 Rp 125,000 Rp 18,750
Pasir beton m3 0.100 Rp - Rp -
Koral Beton m3 0.150 Rp - Rp -
Bata merah bh 30.000 Rp - Rp -
Seng Plat lbr 0.250 Rp - Rp -
Jendela nako (rangka + kaca 5 mm) m2 0.500 Rp - Rp -
Kaca Polos m2 0.080 Rp - Rp -
Kunci Tanam bh 0.150 Rp - Rp -
Bahan Plywood 4 mm lbr 0.060 Rp - Rp -
Tukang kayu Oh 2.000 Rp - Rp -
Tukang batu Oh 1.000 Rp 35,000 Rp 35,000
Pekerja Oh 2.000 Rp 25,000 Rp 50,000
Kepala tukang Oh 0.300 Rp 40,000 Rp 12,000
Tenaga Mandor Oh 0.050 Rp 45,000 Rp 2,250
I
1 Pekerjaan Pembersihan
Luas = 224.00 m2
10.00
-0.05
8.80 3.00 3.00
elasar
BPD
S
± 0.00
(Keterangan : 0.15 adalah jarak antar beugel; 0.6 adalah panjang 1 beugel)
Panjang 1 Beugel = 64 Cm
d). Latei
Lebar (L) = - M
Tinggi (t) = - M
Panjang (n) = - M
Jumlah besi untk Latei = - btng
Volume beton (v) = - x - x -
= - M3
Kebutuhan besi 12 mm = - x - / 11.50
= - btg
(Keterangan : 11,90 adalah ukuran panjang 1 staff besi)
0.15
Kebutuhan besi 6 mm (beugel) = - / 0.15 x 0.54 / 11.5 Tul. Pokok
= - btg Beugel 0.11 4 Ø 12 mm
Ø 6 mm
0.11 0.15
Panjang 1 Beugel = 54 Cm
e). Ringbalk
Lebar (L) = 0.15 M
Tinggi (t) = 0.20 M
Panjang (n) = 87.00 M
Jumlah besi untk Sloof/Ringbalk = 4.00 btng
Volume beton (v) = 0.15 x 0.20 x 87.00
= 2.61 M3
Kebutuhan besi 12 mm = 87.00 x 4.00 / 11.50
0.15
= 30.26 btg
(Keterangan : 12 adalah ukuran panjang 1 staff besi)
Tul. Pokok
0.11
Kebutuhan besi 6 mm (beugel) = 87.00 / 0.20 x 0.64 / 11.5
= 24.21 btg Beugel 4 Ø 12 mm
Ø 6 mm
0.16 0.20
Panjang 1 Beugel = 64 Cm
0.16 0.20
Panjang 1 Beugel = 64 Cm
0.11 0.15
Panjang 1 Beugel = 54 Cm
Panjang 1 Beugel = 54 Cm
11 Pekerjaan Dinding
Utama
Panjang = 80.00
Tinggi = 3.00
Luas = P x T
= 80.00 x 3.00
= 240.00 m2
Luas Kap Bata Bangunan Utama
= 28.49 m2 Sisi Kr+Kn+Tengah
Luas Kap Bata Bangunan Aula
= 2.42 m2
Luas Bata Bangunan Aula (Penutup Atap diatas Ringbalk) 0.70
= 15.96 m2
TOTAL = 286.86 m2
Bouvent Kayu Klas I 5/10 = 54 Cm
Luas bukaan (Pintu, Jendela, Kolom, Latei)
Pintu = 23.58 m2
Jendela = 10.92 m2
Boven Batu = 1.58 m2
Ventilasi = - m2
Kolom = - m2
Latei = - m2
Total = 36.07 m2
Luas Pekerjaan dinding = 250.79 m2
Pot. C - C Pot. B - B
Pot. B - B
Daun Pintu (P1) = 2.00 bh Luas = 0.12 M2
Daun Pintu (P2) = 1.00 bh Luas = 0.04 M2
Daun Pintu (P3) = 6.00 bh Luas = 0.22 M2 0.05 0.05 0.05 0.05
0.10 0.50 0.10 0.10 0.85 0.10 0.05
0.05
Pot. C - C Pot. B - B
Daun Jendela (J1) = 2.00 bh Luas = 0.03 M2 D
0.05
A
0.05
A
0.10 0.05 0.05
0.10 0.10 0.50 0.10
0.10 0.85
M2 0.05 0.05
0.05
0.10 0.75 0.10
B B
B
Kusen Pintu (P1) = 2.00 bh Luas = 0.06 M3 B
C C
1.20
cabening5mm
Kusen Pintu (P3) = 6.00 bh Luas = 0.15 M3
anilka
P
2.05
2.00 2.05
0.05 2.00
D Pintu Type 2 = 5 Bh
Bouvent Kayu Klas I 5/10 = 54 Cm
Skala 1 : 20
15 Pekerjaan Atap
- Luas Atap
1 Luas Atap Ruangan (Type Pelana) 1 2.00
Panjang 1 = 8.00 m' Pjg 2 = 7.00
Kemiringan 1 = 5.45 m' Kemirngn 2 = 4.88
Luas = 8.00 x 5.45 Luas = 68.3
Luas Total Atap = 155.52 m2
- Gording 6/10
Uk. Balok usuk = 0.06 / 0.10
Jumlah Gording =
Panjang 1 gording =
Panjang keseluruhan = 256.00
Ukuran balok = 0.06 x 0.10 x 256.0
Volume = 1.54 m3
Papan Jepit
Uk. Papan = 0.03 x 0.12
Panjang skoor Papan Jepit 3/12 = -
18 Pekerjaan Finishing
● Mengecat bidang Seng
Luas = 185.52 M2
● Mengecat dinding
panjang = - m
tinggi = - m
- x
Luas = 501.58 M2
Luas pengecatan segi tiga ruangan
- x -
= - m2
● Pengecatan Listplank
panjang = 258.64 m
tinggi = 0.20 m
luas = 51.73 m2
● Pengecatan Listplafond
panjang = 243.00 m
tinggi = 0.05 m
luas = 12.15 m2
● Pengecatan Kosen
Pintu Type 1 1.00 bh
panjang 1 = 4.10 m Lebar Bidang Cat 1 = 0.3
panjang 2 = 1.50 m Lebar Bidang Cat 2 = 0.2
luas = 1.53 m2
Bouvent - Bh
panjang 1 = - m Lebar Bidang Cat 1 = 0.3
panjang 2 = - m Lebar Bidang Cat 2 = 0.2
luas = - m2
TOTAL 8.32 m2
19 Pekerjaan Lain - lain
Engsel pintu = 36.00 bh
Engsel Jendela = 28.00 bh
Engsel Bouvent = - bh ( Bouvent Pintu dan Jendela )
Kunci pintu tanam = 11.00 bh
Kait angin = 28.00 bh ( 1 jendela 2 kait Angin - Kiri + Kanan )
Grendel jendela = 14.00 bh ( Bouvent Pintu dan Jendela )
Grendel Pintu = 12.00 bh
21 Perlengkapan Lain
Kasur = 2.00 Bh
Bantal Kepala = 4.00 Bh
BantaL Guling = 2.00 Bh
Seprei = 2.00 Bh
Sarung Bantal Kepala = 4.00 Bh
Sarung Bantal Guling = 2.00 Bh
22 Permainan
Permainan Luar = bh
Ayunan biasa = bh
Peluncur 2 arah = bh
Bola Dunia = bh
Jungkitan = bh
Permainan Dalam
23 Pekerjaan Septiktank
Pekerjaan Galian
- Galian Lubang Pemecah kotoran
Panjang (P) = -
Lebar (L) = 0.55
Tinggi (T) = 0.75
Volume = P x L x t
= - 0.55 0.75
= -
- Galian Lubang Septiktank
Panjang (P) = 1.50
Lebar (L) = 1.50
Tinggi (T) = 1.50
Volume = P x L x t
= 1.50 1.50 1.50
= 3.38
TOTAL = 6.750
Tulangan
Besi 10 mm
Melintang dan memanjang = 10.00
Pjg 1 staf melintang = 1.55
Pjg keseluruhan = 15.50 x 2.00 x 2.00
63.00 m
Kebutuhan besi 10 = 5.48 btg
Berat besi 10 = 40.56 kg KET.
D 10 = 7.4 kg/btg
D6 = 2.7 kg/btg
Instalasi Septiktank
Pipa PVC Ø 4'' = 2.00 btg
Knee PVC 4'' = 3.00 bh
Pipa PVC Ø 2'' = 2.00 btg
Knee PVC 2'' = 2.00 bh
Lem Paralon = 3.00 bh
Kloset Jongkok = 3.00 bh
Pipa Hawa = 1.00 bh
Pekerjaan Urugan Pasir, kerikil 2/3, batu 15/20 dan ijuk pd peresapan septiktank
Pasir
Luas (L) = 2.25
Tinggi (T) = 0.40
Volume = L x T
= 2.25 x 0.40
= 0.90
Kerikil 2/3
Luas (L) = 2.25
Tinggi (T) = 0.40
Volume = L x T
= 2.25 x 0.40
= 0.90
Batu 15/20
Luas (L) = 2.25
Tinggi (T) = 0.20
Volume = L x T
= 2.25 x 0.20
= 0.45
Galian La = 0.60
t = 0.70
p = - M'
vol = -
Pas. Batu 1 : 5
- Saluran
Panjang (P) = - M'
Luas I = 0.35 M2
Luas II = 0.12 M2
Luas = 0.23 M2
Volume = - M3
- Plester saluran = - M2
24 Pekerjaan instalasi listrik
Instalasi Listrik 900 watt = 1.00 ls Bonus Sekring Box dan instalisi ……… titik lampu
Neon (Philips) 18 Watt = 15.00 bh
Fiting Lampu = 15.00 bh
Saklar Ganda = 5.00 bh
Saklar Tunggal = 4.00 bh
Stop Kontak Lengkap = 8.00 bh
Embos = bh
Kabel Listrik NYM 2 x 1,5 mm = m'
ANALISA SATUAN BAHAN
Kebutuhan
Volume Satuan Analisa
- 1 M3 Membuat Balok Latei beton bertulang 1PC : 2Psr : 3Krl Bahan Alat Pekerja Tukang
8.0750 Zak Semen portland -
0.5200 M3 Pasir beton -
0.7800 M3 Kerikil 2/3 -
5.9600 org Pekerja -
0.3500 org Tukang Batu -
2.8000 org Tukang Kayu -
1.4000 org Tukang Besi -
2.61 M3 1 M3 Membuat Ringbalk beton bertulang 1PC : 2Psr : 3Krl Bahan Alat Pekerja Tukang
8.0750 Zak Semen portland 21.08
0.5200 M3 Pasir beton 1.36
0.7800 M3 Kerikil 2/3 2.04
4.8500 org Pekerja 12.66
0.3500 org Tukang Batu 0.91
1.5600 org Tukang Kayu 4.07
1.4000 org Tukang Besi 0.91
0.71 M3 1 M3 Membuat Gewel beton bertulang 1PC : 2Psr : 3Krl Bahan Alat Pekerja Tukang
8.0750 Zak Semen portland 5.73
0.5200 M3 Pasir beton 0.37
0.7800 M3 Kerikil 2/3 0.55
4.8500 org Pekerja 3.44
0.3500 org Tukang Batu 0.25
1.5600 org Tukang Kayu 1.11
1.4000 org Tukang Besi 0.25
4.65 M3 3
1 M Membuat lantai beton, 1PC : 3Psr : 5Krl tebal 7cm
0.0260 M3 Batu pecah 2/3 0.12
0.5700 M3 Pasir Pasang 2.65
4.3250 Zak Semen 40 kg 20.11
0.2500 Org Tukang Batu 1.16
1.6500 Org Pekerja 7.67
-
Bahan Alat Pekerja Tukang
6.75 M3 1 M3 Galian Tanah biasa sedalam 1 meter
0.6250 Pekerja 4.22
Bahan Alat Pekerja Tukang
4.50 M2 2
1 M Pasangan bata merah tebal ½ bata, 1PC : 5Psr
70.000 Bh Batu Bata Merah 315
0.045 M3 Pasir Pasang 0.20
0.242 zak Semen 40 kg 1.09
0.100 Org Tukang 0.45
0.320 Org Pekerja 1.44
- M3 3
1 M Galian Tanah biasa sedalam 1 meter
0.7500 Org Pekerja -
II ALAT
1 Benang Nilon 4.00 - 4.00 20,000.00 - 80,000.00
- - - - - -
III UPAH
1 Tukang 5.00 - 5.00 HOK 84,000.00 - 420,000.00
2 Pekerja 5.00 - 5.00 HOK 52,500.00 - 262,500.00
IV LAIN-LAIN
1 Papan Proyek 1.00 1.00 Ls 100,000.00 - 100,000.00
2 Prasasti 1.00 1.00 Bh 700,000.00 - 700,000.00
Sub Total I - -
II ALAT
1 Paquel 2.00 2.00 - 67,000.00 134,000.00 -
2 Cangkul 2.00 2.00 - 67,000.00 134,000.00 -
3 Linggis 2.00 2.00 - 67,000.00 134,000.00 -
4 Sekop 3.00 3.00 - 78,000.00 234,000.00 -
III UPAH
1 Tukang - - HOK 84,000.00 - -
2 Pekerja 16.00 16.00 HOK 52,500.00 - 840,000.00
IV LAIN-LAIN
Sub Total IV - -
Total Biaya ( I + II + III + IV ) 636,000 840,000
II ALAT
1 Sekop 2.00 - 2.00 Bh 78,000.00 - 156,000.00
2 Gerobak dorong 1.00 - 1.00 Bh 446,000.00 - 446,000.00
III UPAH
1 Tukang - - HOK 84,000.00 - -
2 Pekerja 9.00 9.00 HOK 52,500.00 - 472,500.00
IV LAIN-LAIN
Sub Total IV - -
Total Biaya ( I + II + III + IV ) - 7,352,500
II ALAT
1 Sekop 2.00 - 2.00 Bh 78,000.00 - 156,000.00
2 Ember Coor 5.00 - 5.00 Bh 17,000.00 - 85,000.00
3 Ember Campuran 5.00 - 5.00 Bh 28,000.00 - 140,000.00
4 Profil Tank 2200 Ltr 1.00 - 1.00 Bh 4,237,000.00 - 4,237,000.00
5 Terpal 4 x 6 1.00 - 1.00 Bh 201,000.00 - 201,000.00
III UPAH
1 Tukang 12.00 12.00 HOK 84,000.00 - 1,008,000.00
2 Pekerja 29.00 29.00 HOK 52,500.00 - 1,522,500.00
IV LAIN-LAIN
Sub Total IV - -
Total Biaya ( I + II + III + IV ) - 18,712,500
II ALAT
1 Sekop 2.00 - 2.00 78,000.00 - 156,000.00
2 Ember Coor 5.00 - 5.00 17,000.00 - 85,000.00
III UPAH
1 Tukang 17.00 17.00 HOK 84,000.00 - 1,428,000.00
2 Pekerja 35.00 35.00 HOK 52,500.00 - 1,837,500.00
IV LAIN-LAIN
Sub Total IV - -
Total Biaya ( I + II + III + IV ) - 29,473,500
II ALAT
1 Kawat Ayak 4.00 4.00 M' 28,000.00 - 112,000.00
III UPAH
1 Tukang 102.00 102.00 HOK 84,000.00 - 8,568,000.00
2 Pekerja 193.00 193.00 HOK 52,500.00 - 10,132,500.00
IV LAIN-LAIN
Sub Total IV - -
Total Biaya ( I + II + III + IV ) - 51,046,375
II ALAT
Sub Total II - -
III UPAH
1 Tukang 14.00 14.00 HOK 84,000.00 - 1,176,000.00
2 Pekerja 5.00 5.00 HOK 52,500.00 - 262,500.00
IV LAIN-LAIN
Sub Total IV - -
Total Biaya ( I + II + III + IV ) - 40,333,500
II ALAT
Sub Total II - -
III UPAH
1 Tukang 34.00 34.00 HOK 84,000.00 - 2,856,000.00
2 Pekerja 39.00 39.00 HOK 52,500.00 - 2,047,500.00
IV LAIN-LAIN
Sub Total IV - -
Total Biaya ( I + II + III + IV ) - 51,027,500
II ALAT
Sub Total II - -
III UPAH
1 Tukang 19.00 19.00 HOK 84,000.00 - 1,596,000.00
2 Pekerja 56.00 56.00 HOK 52,500.00 - 2,940,000.00
IV LAIN-LAIN
Sub Total IV - -
Total Biaya ( I + II + III + IV ) - 14,980,000
II ALAT
Sub Total II - -
III UPAH
1 Tukang 62.00 62.00 HOK 84,000.00 - 5,208,000.00
2 Pekerja 52.00 52.00 HOK 52,500.00 - 2,730,000.00
IV LAIN-LAIN
Sub Total IV - -
Total Biaya ( I + II + III + IV ) - 15,794,000
II ALAT
- - -
- - -
Sub Total II - -
III UPAH
1 Tukang 9.00 9.00 Ls 84,000.00 - 756,000.00
2 Pekerja 11.00 11.00 Ls 52,500.00 - 577,500.00
IV LAIN-LAIN
Sub Total IV - -
Total Biaya ( I + II + III + IV ) - 5,860,500
II ALAT
1 Kuas biasa 4" 5.00 - 5.00 Bh 17,000.00 - 85,000.00
2 Kuas roll Besar dan Sedang 3.00 - 3.00 Bh 39,000.00 - 117,000.00
3 Kuas biasa 3" 3.00 - 3.00 Bh 13,000.00 - 39,000.00
4 Kuas Biasa 2" 2.00 - 2.00 Bh 11,000.00 - 22,000.00
5 Kertas Amplas 10.00 - 10.00 Lbr 6,000.00 - 60,000.00
III UPAH
1 Tukang 9.00 9.00 HOK 84,000.00 - 756,000.00
2 Pekerja 66.00 66.00 HOK 52,500.00 - 3,465,000.00
IV LAIN-LAIN
Sub Total IV - -
Total Biaya ( I + II + III + IV ) - 8,180,000
II ALAT
1 - - -
2 - - -
Sub Total II - -
III UPAH
1 Tukang - - HOK - - -
2 Pekerja - - HOK - - -
IV LAIN-LAIN
Sub Total IV - -
Total Biaya ( I + II + III + IV ) - 10,038,000
II ALAT
Sub Total II - -
III UPAH
IV LAIN-LAIN
Sub Total IV - -
Total Biaya ( I + II + III + IV ) - 1,762,000
MEUBELER
1 Tempat Tidur 2.00 - 2.00 Bh Rp 1,338,000 Rp - Rp 2,676,000
2 Lemari Arsip 1.00 - 1.00 Bh Rp 836,000 Rp - Rp 836,000
3 Lemari Obat 1.00 - 1.00 Bh Rp 836,000 Rp - Rp 836,000
4 Meja 1/2 Biro 2.00 - 2.00 Bh Rp 1,394,000 Rp - Rp 2,788,000
5 Kursi Kayu 8.00 - 8.00 Bh Rp 279,000 Rp - Rp 2,232,000
6 Bangku Kayu 2.00 - 2.00 Bh Rp 335,000 Rp - Rp 670,000
7 Kursi Pelastik - - - Bh Rp - Rp - Rp -
BAHAN/MATERIAL LOKAL
1 Pasir pasang 42.00 - 42.00 M3 Rp 229,000 Rp - Rp 9,618,000###
2 Pasir urug 8.00 - 8.00 M3 Rp 229,000 Rp - Rp 1,832,000###
3 Tanah urug 26.00 - 26.00 M3 Rp 171,000 Rp - Rp 4,446,000###
4 Batu Pasang 22.00 - 22.00 M3 Rp 231,000 Rp - Rp 5,082,000###
5 Kerikil uk. 2/3 5.00 - 5.00 M3 Rp 567,000 Rp - Rp 2,835,000###
6 Batu Bata 17,555.00 - 17,555.00 Bh Rp 1,000 Rp - Rp 17,555,000
7 Air Kerja 3.00 - 3.00 Tengki Rp 350,000 Rp - Rp 1,050,000
INSTALASI LISTRIK
1 Instalasi Listrik 900 watt 1.00 - 1.00 Ls Rp 2,788,000 Rp - Rp 2,788,000
2 Neon (Philips) 18 Watt 15.00 - 15.00 Bh Rp 78,000 Rp - Rp 1,170,000
3 Fiting Lampu 15.00 - 15.00 Bh Rp 17,000 Rp - Rp 255,000
4 Saklar Ganda 5.00 - 5.00 Bh Rp 22,000 Rp - Rp 110,000
5 Saklar Tunggal 4.00 - 4.00 Bh Rp 17,000 Rp - Rp 68,000
6 Stop Kontak Lengkap 8.00 - 8.00 Bh Rp 17,000 Rp - Rp 136,000
7 Embos - - - Bh Rp - Rp - Rp -
8 Kabel Listrik NYM 2 x 1,5 mm - - - Bh Rp - Rp - Rp -
###
Mengetahui : Diperiksa Oleh : Dibuat Oleh :
Kepala Desa ............................... ....................................... Tim Pelaksana Kegiatan Desa
SPESIFIKASI
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL JENIS MM SAT DIAMETER LUAR KE LOKASI KETERANGAN
Tebal Brt tanpa Ulir
Max (mm) Min (mm) Min Kg / Btg (Rp) (Rp)
7 Socket Lurus Ø3 Bh
Socket Lurus Ø 2 1/2 Bh
Socket Lurus Ø2 Bh
Socket Lurus Ø 1 1/2 Bh
Socket Lurus Ø1 Bh
Socket Lurus Ø 3/4 Bh
Socket Lurus Ø 1/2 Bh
SPESIFIKASI
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL JENIS MM SAT DIAMETER LUAR KE LOKASI KETERANGAN
Tebal Brt tanpa Ulir
Max (mm) Min (mm) Min Kg / Btg (Rp) (Rp)
8 Socket bok /Knee 90 Ø3 Bh
Socket bok /Knee 90 Ø 2 1/2 Bh
Socket bok /Knee 90 Ø2 Bh
Socket bok /Knee 90 Ø 1 1/2 Bh
Socket bok /Knee 90 Ø1 Bh
Socket bok /Knee 90 Ø 3/4 Bh
Socket bok /Knee 90 Ø 1/2 Bh
10 Socket Tee Ø3 Bh
Socket Tee Ø 2 1/2 Bh
Socket Tee Ø2 Bh
Socket Tee Ø 1 1/2 Bh
Socket Tee Ø1 Bh
Socket Tee Ø 3/4 Bh
Socket Tee Ø 1/2 Bh
11 Elbow Ø3 Bh
Elbow Ø 2 1/2 Bh
Elbow Ø2 Bh
Elbow Ø 1 1/2 Bh
Elbow Ø1 Bh
Elbow Ø 3/4 Bh
Elbow Ø 1/2 Bh
SPESIFIKASI
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL JENIS MM SAT DIAMETER LUAR KE LOKASI KETERANGAN
Tebal Brt tanpa Ulir
Max (mm) Min (mm) Min Kg / Btg (Rp) (Rp)
12 Over loop Ø 3 - 2 1/2 Bh
Over loop Ø3-2 Bh
Over loop Ø 3 - 1 1/2 Bh
Over loop Ø3-1 Bh
Over loop Ø 2 1/2 - 2 Bh
Over loop Ø 2 1/2 - 1 1/2 Bh
Over loop Ø 2 1/2 - 1 Bh
Over loop Ø 2 1/2 - 3/4 Bh
Over loop Ø 2 1/2 - 1/2 Bh
Over loop Ø 2 - 1 1/2 Bh
Over loop Ø2 - 1 Bh
Over loop Ø 2 - 3/4 Bh
Over loop Ø 2 - 1/2 Bh
Over loop Ø 1 1/2 - 1 Bh
Over loop Ø 1 1/2 - 3/4 Bh
Over loop Ø 1 1/2 - 1/2 Bh
Over loop Ø 1 - 3/4 Bh
Over loop Ø 1 - 1/2 Bh
Over loop Ø 3/4 - 1/2 Bh
15 Doble Nippel Ø3
Doble Nippel Ø 2 1/2 Bh
Doble Nippel Ø2 Bh
Doble Nippel Ø 1 1/2 Bh
Doble Nippel Ø1 Bh
Doble Nippel Ø 3/4 Bh
Doble Nippel Ø 1/2 Bh
18 Dop Ø 2 1/2 Bh
Dop Ø2 Bh
Dop Ø 1 1/2 Bh
Dop Ø1 Bh
Dop Ø 3/4 Bh
Dop Ø 1/2 Bh
SPESIFIKASI
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL JENIS MM SAT DIAMETER LUAR KE LOKASI KETERANGAN
Tebal Brt tanpa Ulir
Max (mm) Min (mm) Min Kg / Btg (Rp) (Rp)
19 Stop Kran Ø3 Merek Onda Bh
Stop Kran Ø 2 1/2 Merek Onda Bh
Stop Kran Ø2 Merek Onda Bh
Stop Kran Ø 1 1/2 Merek Onda Bh
Stop Kran Ø1 Merek Onda Bh
Stop Kran Ø 3/4 Merek Onda Bh
Stop Kran Ø 1/2 Merek Onda Bh
SPESIFIKASI
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL JENIS MM SAT DIAMETER LUAR KE LOKASI KETERANGAN
Tebal Brt tanpa Ulir
Max (mm) Min (mm) Min Kg / Btg (Rp) (Rp)
…………………………….., …………………………………….2014
(.................................................) ( )
Perhitungan RAB : Bendahara Desa :
Harga Satuan PPN PPh Harga Dalam PPN PPh Harga Sat. 2,000,000
Harga Sat. Dalam RAB DPP
Bahan Kwitansi Dalam RAB
10% 1.5% 10% 1.5%
6,000,000 600,000 90,000 6,690,000 6,690,000 6,000,000 600,000 90,000 6,690,000 PPn + PPh Ok
7,500,000 750,000 112,500 8,362,500 8,362,500 7,500,000 750,000 112,500 8,362,500 PPn + PPh Ok
11,250,000 1,125,000 168,750 12,543,750 12,543,750 11,250,000 1,125,000 168,750 12,543,750 PPn + PPh Ok
3,010,000 301,000 45,150 3,356,150 3,356,150 3,010,000 301,000 45,150 3,356,150 PPn + PPh Ok
llllllllllllllllllllllllllllllllllllll
RENCANA ANGGARAN BIAYA
HARGA
JUMLAH
NO. URAIAN VOLUME SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5 6=3 x5
I. BELANJA BARANG & JASA
1 Upah Tenaga Kerja 1 Borongan 50,862,000 50,862,000
2 Ops. TPK 1 Ls 5,308,000 5,308,000
3 Ops. Tim Perencana 1 Ls 7,963,000 7,963,000
4 Alat:
- Sekop 6 Bh 78,000 468,000
- Ember Coor 5 Bh 17,000 85,000
- Ember Campuran 5 Bh 28,000 140,000
- Profil Tank 2200 Ltr 1 Bh 4,237,000 4,237,000
- Kuas biasa 4'' 5 Bh 17,000 85,000
- Kuas biasa 3'' 3 Bh 13,000 39,000
- Kuas biasa 2'' 2 Bh 11,000 22,000
- Kuas roll 3 Bh 39,000 117,000
- Terpal 4 x 6 1 Bh 201,000 201,000
- Benang Nilon 4 Roll 20,000 80,000
- Kawat Ayak 4 m 28,000 112,000
- Gerobak Dorong 1 Bh 446,000 446,000
c Meubeler
- Tempat Tidur 2 Bh 1,338,000 2,676,000
- Lemari Arsip 1 Bh 836,000 836,000
- Lemari Obat 1 Bh 836,000 836,000
- Meja 1/2 Biro 2 Bh 1,394,000 2,788,000
- Kursi Kayu 8 Bh 279,000 2,232,000
- Bangku Kayu 2 Bh 335,000 670,000
- Kursi Pelastik 0 Bh - -
4 INSTALASI LISTRIK
Instalasi Listrik 900 watt 1 Ls 2,788,000 2,788,000
Neon (Philips) 18 Watt 15 Bh 78,000 1,170,000
Fiting Lampu 15 Bh 17,000 255,000
Saklar Ganda 5 Bh 22,000 110,000
Saklar Tunggal 4 Bh 17,000 68,000
Stop Kontak Lengkap 8 Bh 17,000 136,000
5 LAIN - LAIN
Papan Nama Proyek 1 Ls 100,000 100,000
Prasasti 1 Bh 700,000 700,000
-
JUMLAH (Rp.) 265,424,600
llllllllllllllllllllllllllllllllllllll
DANA DESA 2017
REKAPITULASI PER
Provinsi : NTT
Kabupaten : Flores Timur
Kecamatan : Witihama
Desa : Waiwuring
Disetujui
Kepala Desa Riangduli
-
-
-
-
-
-
Pajak 5%
4,000
2,500
JUMLAH - -
llllllllllllllllllllllllllllllllllll
JUMLAH PAJAK
PPh 1,5%
-
-
-
-
-
-
Total
116,000.00
355,000.00
471,000.00
llllllllllllllllllllllllllllllllllllll