SURVEY HARGA SATUAN

PROPINSI : NTT CV/UD/Perorangan : CV. Ramayana


KABUPATEN : FLORES TIMUR ALAMAT : Hokeng - Wolorona
STATUS : Mei 2011

ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL SAT SPESIFIKASI/ JENIS KAYU KE LOKASI KETERANGAN

(Rp) (Rp)

1 Papan Mal / Begesting Kls III (3.5 Cm) Lbr Rita, Kemiri, Kapuk Hutan. 17,000.00
M3 600,000.00

2 Kayu Balok 7/15 kelas I Btg Bayam 270,000.00


M3 6,500,000.00

3 Kayu Balok 8/12 kelas II Btg Meranti, Mahoni,Ampupu, Sureng. 100,000.00

M3 2,600,000.00

4 Kayu Balok 6/12 kelas II Btg Meranti, Mahoni,Ampupu, Sureng. 86,000.00

M3 3,000,000.00

5 Kayu Balok 6/10 kelas II Btg Meranti, Mahoni,Ampupu, Sureng. 71,000.00

M3 3,000,000.00

6 Kayu Usuk 5/7 kelas II Btg Meranti, Mahoni,Ampupu, Sureng. 31,000.00

M3 2,600,000.00

7 Kayu Usuk 4/6 kelas II Btg Meranti, Mahoni,Ampupu, Sureng. 28,000.00

M3 3,000,000.00

8 Papan tebal 4 cm kelas I Lbr Bayam, Jati 270,000.00

M3 6,500,000.00

9 Papan tebal 4 cm kelas II Lbr Meranti, Mahoni,Ampupu, Sureng. 100,000.00

M3 2,600,000.00

10 Papan tebal 3 cm kelas I Lbr Bayam, Jati 270,000.00

M3 6,500,000.00

11 Papan tebal 3 cm kelas II Lbr Meranti, Mahoni,Ampupu, Sureng. 88,000.00

M3 3,000,000.00

12 Papan tebal 2.5 cm kelas I Lbr Bayam, Jati 270,000.00

M3 6,500,000.00

13 Papan tebal 2.5 cm kelas II Lbr Meranti, Mahoni,Ampupu, Sureng. 67,500.00


M3 2,700,000.00

Hokeng, 17 Mei 2011

DISURVEY OLEH PIMPINAN CV.Ramayana

(........................................) (Yulius G. Ngathu)


SURVEY HARGA SATUAN
PROPINSI : NTT CV/UD/Perorangan : Irak Bengkel
KABUPATEN : FLORES TIMUR ALAMAT : Boru - Wulanggitang
STATUS : Mei 2011

ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL SAT SPESIFIKASI/ JENIS KAYU KE LOKASI KETERANGAN

(Rp) (Rp)

1 Papan Mal / Begesting Kls III (3.5 Cm) Lbr Rita, Kemiri, Kapuk Hutan. 35,000.00
M3 1,000,000.00

2 Kayu Balok 7/15 kelas I Btg Bayam 275,000.00


M3 6,500,000.00

3 Kayu Balok 8/12 kelas II Btg Meranti, Mahoni,Ampupu, Sureng. 130,000.00

M3 3,500,000.00

4 Kayu Balok 6/12 kelas II Btg Meranti, Mahoni,Ampupu, Sureng. 110,000.00

M3 3,500,000.00

5 Kayu Balok 6/10 kelas II Btg Meranti, Mahoni,Ampupu, Sureng. 80,000.00

M3 3,500,000.00

6 Kayu Usuk 5/7 kelas II Btg Meranti, Mahoni,Ampupu, Sureng. 50,000.00

M3 3,500,000.00

7 Kayu Usuk 4/6 kelas II Btg Meranti, Mahoni,Ampupu, Sureng. 35,000.00

M3 3,500,000.00

8 Papan tebal 4 cm kelas I Lbr Bayam, Jati 240,000.00

M3 6,500,000.00

9 Papan tebal 4 cm kelas II Lbr Meranti, Mahoni,Ampupu, Sureng. 140,000.00

M3 3,500,000.00

10 Papan tebal 3 cm kelas I Lbr Bayam, Jati 182,000.00

M3 6,500,000.00

11 Papan tebal 3 cm kelas II Lbr Meranti, Mahoni,Ampupu, Sureng. 106,000.00

M3 3,500,000.00

12 Papan tebal 2.5 cm kelas I Lbr Bayam, Jati 140,000.00

M3 6,500,000.00

13 Papan tebal 2.5 cm kelas II Lbr Meranti, Mahoni,Ampupu, Sureng. 90,000.00


M3 3,500,000.00

Boru, 18 Mei 2011

DISURVEY OLEH PIMPINAN Irak Bengkel

(........................................) (Robertus W. Irak)


SURVEY HARGA SATUAN
PROPINSI : NTT CV/UD/Perorangan : Berlian Karya
KABUPATEN : FLORES TIMUR ALAMAT : PTW. Bao - Larantuka
STATUS : Mei 2011

ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL SAT SPESIFIKASI/ JENIS KAYU KE LOKASI KETERANGAN

(Rp) (Rp)

1 Papan Mal / Begesting Kls III (3.5 Cm) Lbr Rita, Kemiri, Kapuk Hutan. 50,000.00
M3 1,300,000.00

2 Kayu Balok 7/15 kelas I Btg Bayam 250,000.00


M3 6,750,000.00

3 Kayu Balok 8/12 kelas II Btg Meranti, Mahoni,Ampupu, Sureng. 100,000.00

M3 2,400,000.00

4 Kayu Balok 6/12 kelas II Btg Meranti, Mahoni,Ampupu, Sureng. 80,000.00

M3 2,400,000.00

5 Kayu Balok 6/10 kelas II Btg Meranti, Mahoni,Ampupu, Sureng. 65,000.00

M3 2,400,000.00

6 Kayu Usuk 5/7 kelas II Btg Meranti, Mahoni,Ampupu, Sureng. 40,000.00

M3 2,500,000.00

7 Kayu Usuk 4/6 kelas II Btg Meranti, Mahoni,Ampupu, Sureng. 35,000.00

M3 2,500,000.00

8 Papan tebal 4 cm kelas I Lbr Bayam, Jati 250,000.00

M3 7,500,000.00

9 Papan tebal 4 cm kelas II Lbr Meranti, Mahoni,Ampupu, Sureng. 120,000.00

M3 2,500,000.00

10 Papan tebal 3 cm kelas I Lbr Bayam, Jati 240,000.00

M3 7,500,000.00

11 Papan tebal 3 cm kelas II Lbr Meranti, Mahoni,Ampupu, Sureng. 110,000.00

M3 2,500,000.00

12 Papan tebal 2.5 cm kelas I Lbr Bayam, Jati 240,000.00

M3 7,500,000.00

13 Papan tebal 2.5 cm kelas II Lbr Meranti, Mahoni,Ampupu, Sureng. 100,000.00


M3 2,500,000.00

Larantuka, 06 Mei 2011

DISURVEY OLEH PIMPINAN Berlian Karya

(Andy Liwu) (Yos M. Witin)


SURVEY HARGA SATUAN
PROPINSI : NTT CV/UD/Perorangan Gorita
KABUPATEN : FLORES TIMUR ALAMAT Lewoawan
STATUS : Mei 2011

ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL SAT SPESIFIKASI/ JENIS KAYU KE LOKASI KETERANGAN

(Rp) (Rp)

1 Papan Mal / Begesting Kls III (3.5 Cm) Lbr Rita, Kemiri, Kapuk Hutan. 58,000.00

2 Kayu Balok 7/15 kelas I Btg Bayam 270,833.00

3 Kayu Balok 8/12 kelas II Btg Meranti, Mahoni,Ampupu, Sureng. 173,000.00

4 Kayu Balok 6/12 kelas II Btg Meranti, Mahoni,Ampupu, Sureng. 128,571.00

5 Kayu Balok 6/10 kelas II Btg Meranti, Mahoni,Ampupu, Sureng. 107,142.00

6 Kayu Usuk 5/7 kelas II Btg Meranti, Mahoni,Ampupu, Sureng. 32,400.00

7 Kayu Usuk 4/6 kelas II Btg Meranti, Mahoni,Ampupu, Sureng. 43,269.00

8 Papan tebal 4 cm kelas I Lbr Bayam, Jati 26,000.00

9 Papan tebal 4 cm kelas II Lbr Meranti, Mahoni,Ampupu, Sureng. 180,000.00

10 Papan tebal 3 cm kelas I Lbr Bayam, Jati 191,176.00

11 Papan tebal 3 cm kelas II Lbr Meranti, Mahoni,Ampupu, Sureng. 132,352.00

12 Papan tebal 2.5 cm kelas I Lbr Bayam, Jati 162,500.00

13 Papan tebal 2.5 cm kelas II Lbr Meranti, Mahoni,Ampupu, Sureng. 112,500.00

Boru, Mei 2011

DISURVEY OLEH PIMPINAN

(........................................) (Goris Uran)


SURVEY HARGA SATUAN
PROPINSI : NTT CV/UD/Perorangan :Petrus Soge
KABUPATEN : FLORES TIMUR ALAMAT : Ojan - Dulipali
STATUS : Mei 2011

ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL SAT SPESIFIKASI KE LOKASI KETERANGAN

(Rp) (Rp)
1 Batako Bh ukuran 10 x 40 x 20 cm, sisi tajam, keras, tidak pecah

2 Batu Gunung M³ Warna Hitam 20,000.00 Rp. 50.000 / Reit (2,5 M3)

3 Batu Belah 15/20 M³ Batu belah, 3 bidang pecah, keras 20,000.00 Rp. 50.000 / Reit (2,5 M3)

4 Batu Belah 5/7 M³ Batu belah, 3 bidang pecah, keras 30,000.00 Rp. 75.000 / Reit (2,5 M3)

5 Batu Belah 3/5 M³ Batu belah, 3 bidang pecah, keras 250,000.00 Rp. 500.000 / Reit (2,0 M3)

6 Batu Belah 2/3 M³ Batu belah, 3 bidang pecah, keras 250,000.00 Rp. 500.000 / Reit (2,0 M3)

7 Bata Merah Bh ukuran 5 x 10 x 22 cm, sisi tajam, keras, warna merata 600.00

8 Pasir Pasang M³ Pasir kali, tidak mengandung tanah/clay 20,000.00 Rp. 50.000 / Reit (2,5 M3)

9 Pasir Beton M³ Pasir kali, tidak mengandung tanah/clay 20,000.00 Rp. 50.000 / Reit (2,5 M3)

10 Pasir Urug M³ Pasir kali, mengandung tanah/clay 20% 20,000.00 Rp. 50.000 / Reit (2,5 M3)

11 Tanah Urug M³ Tidak tercampur sisa tumbuhan, plastik, 20,000.00

12 Sirtu M³ Pasir batu, uk. Batuan 3-5 cm, 20,000.00 Rp. 50.000 / Reit (2,5 M3)
tidak mengandung tanah/clay

Dulipali, 20 Mei 2011

DISURVEY OLEH PIMPINAN ...............................

(Germana G. Mau) (Petrus Soge)


SURVEY HARGA SATUAN
PROPINSI : NTT CV/UD/Perorangan :Anton Puka
KABUPATEN : FLORES TIMUR ALAMAT : Ojan - Dulipali
STATUS : Mei 2011

ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL SAT SPESIFIKASI KE LOKASI KETERANGAN

(Rp) (Rp)
1 Batako Bh ukuran 10 x 40 x 20 cm, sisi tajam, keras, tidak pecah

2 Batu Gunung M³ Warna Hitam 20,000.00 Rp. 50.000 / Reit (2,5 M3)

3 Batu Belah 15/20 M³ Batu belah, 3 bidang pecah, keras 20,000.00 Rp. 50.000 / Reit (2,5 M3)

4 Batu Belah 5/7 M³ Batu belah, 3 bidang pecah, keras 30,000.00 Rp. 75.000 / Reit (2,5 M3)

5 Batu Belah 3/5 M³ Batu belah, 3 bidang pecah, keras 250,000.00 Rp. 500.000 / Reit (2,0 M3)

6 Batu Belah 2/3 M³ Batu belah, 3 bidang pecah, keras 250,000.00 Rp. 500.000 / Reit (2,0 M3)

7 Bata Merah Bh ukuran 5 x 10 x 22 cm, sisi tajam, keras, warna merata 600.00

8 Pasir Pasang M³ Pasir kali, tidak mengandung tanah/clay 20,000.00 Rp. 50.000 / Reit (2,5 M3)

9 Pasir Beton M³ Pasir kali, tidak mengandung tanah/clay 20,000.00 Rp. 50.000 / Reit (2,5 M3)

10 Pasir Urug M³ Pasir kali, mengandung tanah/clay 20% 20,000.00 Rp. 50.000 / Reit (2,5 M3)

11 Tanah Urug M³ Tidak tercampur sisa tumbuhan, plastik, 20,000.00 Rp. 50.000 / Reit (2,5 M3)

12 Sirtu M³ Pasir batu, uk. Batuan 3-5 cm, 20,000.00 Rp. 50.000 / Reit (2,5 M3)
tidak mengandung tanah/clay

Dulipali, 20 Mei 2011

DISURVEY OLEH PIMPINAN ...............................

(Germana G. Mau) (Anton Puka)


SURVEY HARGA SATUAN
PROPINSI : NTT CV/UD/Perorangan :Gelu Bukan
KABUPATEN : FLORES TIMUR ALAMAT : Ojan - Dulipali
STATUS : Mei 2011

ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL SAT SPESIFIKASI KE LOKASI KETERANGAN

(Rp) (Rp)
1 Batako Bh ukuran 10 x 40 x 20 cm, sisi tajam, keras, tidak pecah

2 Batu Gunung M³ Warna Hitam 20,000.00 Rp. 50.000 / Reit (2,5 M3)

3 Batu Belah 15/20 M³ Batu belah, 3 bidang pecah, keras 20,000.00 Rp. 50.000 / Reit (2,5 M3)

4 Batu Belah 5/7 M³ Batu belah, 3 bidang pecah, keras 30,000.00 Rp. 75.000 / Reit (2,5 M3)

5 Batu Belah 3/5 M³ Batu belah, 3 bidang pecah, keras 250,000.00 Rp. 500.000 / Reit (2,0 M3)

6 Batu Belah 2/3 M³ Batu belah, 3 bidang pecah, keras 250,000.00 Rp. 500.000 / Reit (2,0 M3)

7 Bata Merah Bh ukuran 5 x 10 x 22 cm, sisi tajam, keras, warna merata 600.00

8 Pasir Pasang M³ Pasir kali, tidak mengandung tanah/clay 20,000.00 Rp. 50.000 / Reit (2,5 M3)

9 Pasir Beton M³ Pasir kali, tidak mengandung tanah/clay 20,000.00 Rp. 50.000 / Reit (2,5 M3)

10 Pasir Urug M³ Pasir kali, mengandung tanah/clay 20% 20,000.00 Rp. 50.000 / Reit (2,5 M3)

11 Tanah Urug M³ Tidak tercampur sisa tumbuhan, plastik, 20,000.00 Rp. 50.000 / Reit (2,5 M3)

12 Sirtu M³ Pasir batu, uk. Batuan 3-5 cm, 20,000.00 Rp. 50.000 / Reit (2,5 M3)
tidak mengandung tanah/clay

Dulipali, 20 Mei 2011

DISURVEY OLEH PIMPINAN ...............................

(Germana G. Mau) (Gelu Bukan)


SURVEY HARGA SATUAN
PROPINSI : NTT CV/UD/Perorangan :Petrus Kajo Soge
KABUPATEN : FLORES TIMUR ALAMAT : Ojan - Dulipali
STATUS : Mei 2011

ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL SAT SPESIFIKASI KE LOKASI KETERANGAN

(Rp) (Rp)
1 Batako Bh ukuran 10 x 40 x 20 cm, sisi tajam, keras, tidak pecah

2 Batu Gunung M³ Warna Hitam 20,000.00 Rp. 50.000 / Reit (2,5 M3)

3 Batu Belah 15/20 M³ Batu belah, 3 bidang pecah, keras 20,000.00 Rp. 50.000 / Reit (2,5 M3)

4 Batu Belah 5/7 M³ Batu belah, 3 bidang pecah, keras 20,000.00 Rp. 50.000 / Reit (2,5 M3)

5 Batu Belah 3/5 M³ Batu belah, 3 bidang pecah, keras 250,000.00 Rp. 750.000 / Reit (3,0 M3)

6 Batu Belah 2/3 M³ Batu belah, 3 bidang pecah, keras 250,000.00 Rp. 750.000 / Reit (3,0 M3)

7 Bata Merah Bh ukuran 5 x 10 x 22 cm, sisi tajam, keras, warna merata

8 Pasir Pasang M³ Pasir kali, tidak mengandung tanah/clay 20,000.00 Rp. 50.000 / Reit (2,5 M3)

9 Pasir Beton M³ Pasir kali, tidak mengandung tanah/clay 20,000.00 Rp. 50.000 / Reit (2,5 M3)

10 Pasir Urug M³ Pasir kali, mengandung tanah/clay 20% 20,000.00 Rp. 50.000 / Reit (2,5 M3)

11 Tanah Urug M³ Tidak tercampur sisa tumbuhan, plastik,

12 Sirtu M³ Pasir batu, uk. Batuan 3-5 cm, 20,000.00 Rp. 50.000 / Reit (2,5 M3)
tidak mengandung tanah/clay

Dulipali, 16 Mei 2011

DISURVEY OLEH PIMPINAN ...............................

(Petrus Aryo Boleng) (Petrus Kajo Soge)


SURVEY HARGA SATUAN

PROPINSI : NTT TOKO/CV/UD : : Goris Meuble


KABUPATEN : FLORES TIMUR ALAMAT : Boru - Wulanggitang
STATUS : TAHUN ANGGARAN 2011

NAMA/JENIS HARGA SATUAN ONGKOS ANGKUT


NO GAMBAR / SKETSA SAT. SPESIFIKASI BAHAN/BARANG KETERANGAN
BARANG/BARANG KE LOKASI
(Rp.) (RP)

. Lemari Buku bh ukr. Pjg 0,70, lbr 0,40 tinggi 1,50 m


Rak atas kaca dorong 3 mm
* Rangka kayu kls I Bayam 4/5, penutup triplek 2,8 mm, 1 daun pintu Jati 1,250,000.00
* Rangka kayu Jati 4/5, penutup triplek 2,8 mm, 1 daun pintu Jati 1,250,000.00
* Rangka kayu Mahoni 4/5, penutup triplek 2,8 mm, 1 daun pintu Mahoni 900,000.00

. Papan Tulis bh ukr. Pjg 1,5 m, lebar 1,25 m 400,000.00


Rangka kayu Kls I bayam

. Meja 1/2 biro bh ukr. Tinggi 0,75 m


panjang 1,25 m
lebar 0,60 m
* Rangka kayu kls I 4/5, penutup triplek / Daun Papan Jati 1,400,000.00
* Rangka kayu Jati 4/5, penutup triplek / Daun Papan Jati 1,400,000.00

. Kursi Kantor bh ukr. Tinggi 0,85 m


tinggi duduk 0,40 m
lebar depan 0,40 m , Lebar samping 0.45 m
Rangka kayu kls I / Jati , penutup / Daun Papan Jati 350,000.00

. Meja murid bh ukr. Tinggi 0,75 m


panjang 1,00 m, Lebar 0.60 m
* Rangka kayu kls I Bayam 4/5, penutup triplek / Daun Papan Jati 500,000.00
* Rangka kayu Jati 4/5, penutup triplek / Daun Papan Jati 500,000.00

. Kursi murid bh ukr. Tinggi 0,90 m


tinggi duduk 0,40 m
lebar depan 0,40 m , Lebar samping 0.40 m
* Rangka kayu kls I Bayam , penutup / Daun Papan Jati 350,000.00
* Rangka kayu Jati , penutup / Daun Papan Jati 350,000.00

. Daun Pintu Panil Papan bh ukr. 0,82 x 2,0 m s/d 2.10 m 1,300,000.00
bahan kayu kls I, disain standar sesuai gambar

8 Daun Pintu Panil Papan ukr. 0,92 x 2,0 m s/d 2.10 m 1,500,000.00
bahan kayu kls I, disain standar sesuai gambar
. Daun Pintu Double Teakwood bh ukr 0,82 x 2,0 m s/d 2.10 m
bahan kayu kls I Bayam , disain standar sesuai gambar 650,000.00

. Daun Pintu Teakwood bh ukr 0,72 x 2,0 m s/d 2.10 m


Lapis seng Plat. bahan kayu kls I, disain standar sesuai gambar 700,000.00

11 Daun Pintu Trali Papan bh * Ukr. 0.92 x 1.20 m Rangka papan Kls I (Daun pintu Irisan Papan) 650,000.00
* Ukr. 0.92 x 1.20 m Rangka papan Jati (Daun pintu Irisan Papan) 650,000.00

12 Daun Jendela Panil Kaca bh ukr. 0,62 x 1,25 M


* Bahan kayu kls I Bayam 400,000.00
* Bahan kayu Jati 400,000.00

13 Daun Jendela Panil Kaca bh ukr. 0,62 x 1,52 M s/d ……... M


* Bahan kayu kls I Bayam 500,000.00
* Bahan kayu Jati 500,000.00

. Daun Ventilasi Jendela bh ukr. 0,62 x 1,25 M


Panil Kaca * Bahan kayu kls I Bayam 250,000.00
* Bahan kayu Jati 250,000.00

. Kusen Pintu type I standar bh Ukr. Bersih dalam, tinggi lubang pintu 2,00 m, lebar 0,90 m 600,000.00 Harga dihitung per lubang
Ukr Kayu Kosen 5/13 cm Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,92 m
Kayu Kls I, Jenis Bayam

. Kusen Pintu type II standar bh Ukr. Bersih dalam, tinggi lubang pintu 2,00 m, lebar 0,80 m 600,000.00
Ukr Kayu Kosen 5/13 cm Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,80 m Harga dihitung per lubang
Kayu Kls I, Jenis Bayam

. Kusen Pintu type III standar bh Ukr. Bersih dalam, tinggi lubang pintu 2,00 m, lebar 0,70 m 550,000.00 Harga dihitung per lubang
Ukr Kayu Kosen 5/13 cm Tanpa lubang Ventilasi
Kayu Kls I, Jenis Bayam

. Kusen Pintu Stek bh Ukr. Tinggi 1.00 m 500,000.00 Harga dihitung per lubang
Ukr Kayu Kosen 5/13 cm Kayu Kls I, Jenis Bayam

. Kusen Jendela Type I standar bh Ukr. Bersih dalam, tinggi lubang pintu 1.25 m, lebar 0,60 m 350,000.00
Ukr Kayu Kosen 5/13 cm Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,60 m Harga dihitung per lubang
Kayu Kls I, Jenis Bayam

. Kusen Jendela Type I standar bh Ukr. Bersih dalam, tinggi lubang pintu 1.50 m, lebar 0,60 m 350,000.00
Ukr Kayu Kosen 5/13 cm Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,60 m Harga dihitung per lubang
Kayu Kls I, Jenis Bayam

. Kusen BV bh Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,60 m 300,000.00 Harga dihitung per lubang
Ukr Kayu Kosen 5/13 cm Kayu Kls I, Jenis Bayam

. Daun Pintu WC/KM bh Ukr. Pintu Tinggi 2.00 m. Lebar 0.70 m 700,000.00 Harga dihitung per lubang
Daun pintu PVC ( Warna Kayu, Warna Hijau, Biru )

Keterangan : Harga yang dimaksud adalah harga toko / bengkel diluar ongkos angkut

Boru, mai 2011

Disurvey Oleh Pimpinan Goris Meuble

(………………………………) (GORYS HELLAN)


SURVEY HARGA SATUAN

PROPINSI : NTT TOKO/CV/UD : : CV. Ramayana


KABUPATEN : FLORES TIMUR ALAMAT : Wokeng - Wolorona
STATUS : TAHUN ANGGARAN 2011

NAMA/JENIS HARGA SATUAN ONGKOS ANGKUT


NO GAMBAR / SKETSA SAT. SPESIFIKASI BAHAN/BARANG KETERANGAN
BARANG/BARANG KE LOKASI
(Rp.) (RP)

. Lemari Buku bh ukr. Pjg 0,70, lbr 0,40 tinggi 1,50 m


Rak atas kaca dorong 3 mm
* Rangka kayu kls I Bayam 4/5, penutup triplek 2,8 mm, 1 daun pintu Jati 1,750,000.00
* Rangka kayu Jati 4/5, penutup triplek 2,8 mm, 1 daun pintu Jati 1,500,000.00
* Rangka kayu Mahoni 4/5, penutup triplek 2,8 mm, 1 daun pintu Mahoni 1,100,000.00

. Papan Tulis bh ukr. Pjg 1,5 m, lebar 1,25 m


Rangka kayu Kls I bayam 350,000.00

. Meja 1/2 biro bh ukr. Tinggi 0,75 m


panjang 1,25 m
lebar 0,60 m
* Rangka kayu kls I 4/5, penutup triplek / Daun Papan Jati 1,500,000.00
* Rangka kayu Jati 4/5, penutup triplek / Daun Papan Jati 1,250,000.00

. Kursi Kantor bh ukr. Tinggi 0,85 m


tinggi duduk 0,40 m
lebar depan 0,40 m , Lebar samping 0.45 m 450,000.00
Rangka kayu kls I / Jati , penutup / Daun Papan Jati

. Meja murid bh ukr. Tinggi 0,75 m


panjang 1,00 m, Lebar 0.60 m
* Rangka kayu kls I Bayam 4/5, penutup triplek / Daun Papan Jati 500,000.00
* Rangka kayu Jati 4/5, penutup triplek / Daun Papan Jati 450,000.00

. Kursi murid bh ukr. Tinggi 0,90 m


tinggi duduk 0,40 m
lebar depan 0,40 m , Lebar samping 0.40 m
* Rangka kayu kls I Bayam , penutup / Daun Papan Jati 400,000.00
* Rangka kayu Jati , penutup / Daun Papan Jati 350,000.00

. Daun Pintu Panil Papan bh ukr. 0,82 x 2,0 m s/d 2.10 m


bahan kayu kls I, disain standar sesuai gambar 1,500,000.00

8 Daun Pintu Panil Papan bh ukr. 0,92 x 2,0 m s/d 2.10 m


bahan kayu kls I, disain standar sesuai gambar 1,400,000.00
. Daun Pintu Double Teakwood bh ukr 0,82 x 2,0 m s/d 2.10 m
bahan kayu kls I Bayam , disain standar sesuai gambar 1,500,000.00

. Daun Pintu Teakwood bh ukr 0,72 x 2,0 m s/d 2.10 m


Lapis seng Plat. bahan kayu kls I, disain standar sesuai gambar 650,000.00

11 Daun Pintu Trali Papan bh * Ukr. 0.92 x 1.20 m Rangka papan Kls I (Daun pintu Irisan Papan) 1,400,000.00
* Ukr. 0.92 x 1.20 m Rangka papan Jati (Daun pintu Irisan Papan) 1,350,000.00

12 Daun Jendela Panil Kaca bh ukr. 0,62 x 1,25 M


* Bahan kayu kls I Bayam 500,000.00
* Bahan kayu Jati 450,000.00

13 Daun Jendela Panil Kaca bh ukr. 0,62 x 1,52 M s/d ……... M


* Bahan kayu kls I Bayam 600,000.00
* Bahan kayu Jati 500,000.00

. Daun Ventilasi Jendela bh ukr. 0,62 x 1,25 M


Panil Kaca * Bahan kayu kls I Bayam 350,000.00
* Bahan kayu Jati 300,000.00

. Kusen Pintu type I standar bh Ukr. Bersih dalam, tinggi lubang pintu 2,00 m, lebar 0,90 m Harga dihitung per lubang
Ukr Kayu Kosen 5/13 cm Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,92 m 950,000.00
Kayu Kls I, Jenis Bayam

. Kusen Pintu type II standar bh Ukr. Bersih dalam, tinggi lubang pintu 2,00 m, lebar 0,80 m 800,000.00
Ukr Kayu Kosen 5/13 cm Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,80 m Harga dihitung per lubang
Kayu Kls I, Jenis Bayam

. Kusen Pintu type III standar bh Ukr. Bersih dalam, tinggi lubang pintu 2,00 m, lebar 0,70 m 750,000.00 Harga dihitung per lubang
Ukr Kayu Kosen 5/13 cm Tanpa lubang Ventilasi
Kayu Kls I, Jenis Bayam

. Kusen Pintu Stek bh Ukr. Tinggi 1.00 m 350,000.00 Harga dihitung per lubang
Ukr Kayu Kosen 5/13 cm Kayu Kls I, Jenis Bayam

. Kusen Jendela Type I standar bh Ukr. Bersih dalam, tinggi lubang pintu 1.25 m, lebar 0,60 m 450,000.00
Ukr Kayu Kosen 5/13 cm Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,60 m Harga dihitung per lubang
Kayu Kls I, Jenis Bayam

. Kusen Jendela Type I standar bh Ukr. Bersih dalam, tinggi lubang pintu 1.50 m, lebar 0,60 m 450,000.00
Ukr Kayu Kosen 5/13 cm Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,60 m Harga dihitung per lubang
Kayu Kls I, Jenis Bayam

. Kusen BV bh Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,60 m 150,000.00 Harga dihitung per lubang
Ukr Kayu Kosen 5/13 cm Kayu Kls I, Jenis Bayam

. Daun Pintu WC/KM bh Ukr. Pintu Tinggi 2.00 m. Lebar 0.70 m 700,000.00 Harga dihitung per lubang
Daun pintu PVC ( Warna Kayu, Warna Hijau, Biru )

Keterangan : Harga yang dimaksud adalah harga toko / bengkel diluar ongkos angkut

Hokeng Jaya, 17 mai 2011

Disurvey Oleh Pimpinan CV.Ramayana

(………………………………) (Yulius G. Ngathu)


SURVEY HARGA SATUAN

PROPINSI : NTT TOKO/CV/UD : : IRAK BENGKEL


KABUPATEN : FLORES TIMUR ALAMAT : Boru - Wulanggitang
STATUS : TAHUN ANGGARAN 2011

NAMA/JENIS HARGA SATUAN ONGKOS ANGKUT


NO GAMBAR / SKETSA SAT. SPESIFIKASI BAHAN/BARANG KETERANGAN
BARANG/BARANG KE LOKASI
(Rp.) (RP)

. Lemari Buku bh ukr. Pjg 0,70, lbr 0,40 tinggi 1,50 m


Rak atas kaca dorong 3 mm
* Rangka kayu kls I Bayam 4/5, penutup triplek 2,8 mm, 1 daun pintu Jati 1,500,000.00
* Rangka kayu Jati 4/5, penutup triplek 2,8 mm, 1 daun pintu Jati 1,500,000.00
* Rangka kayu Mahoni 4/5, penutup triplek 2,8 mm, 1 daun pintu Mahoni 1,000,000.00

. Papan Tulis bh ukr. Pjg 1,5 m, lebar 1,25 m


Rangka kayu Kls I bayam 750,000.00

. Meja 1/2 biro bh ukr. Tinggi 0,75 m


panjang 1,25 m
lebar 0,60 m
* Rangka kayu kls I 4/5, penutup triplek / Daun Papan Jati 1,000,000.00
* Rangka kayu Jati 4/5, penutup triplek / Daun Papan Jati 1,000,000.00

. Kursi Kantor bh ukr. Tinggi 0,85 m


tinggi duduk 0,40 m
lebar depan 0,40 m , Lebar samping 0.45 m 300,000.00
Rangka kayu kls I / Jati , penutup / Daun Papan Jati

. Meja murid bh ukr. Tinggi 0,75 m


panjang 1,00 m, Lebar 0.60 m
* Rangka kayu kls I Bayam 4/5, penutup triplek / Daun Papan Jati 750,000.00
* Rangka kayu Jati 4/5, penutup triplek / Daun Papan Jati 750,000.00

. Kursi murid bh ukr. Tinggi 0,90 m


tinggi duduk 0,40 m
lebar depan 0,40 m , Lebar samping 0.40 m
* Rangka kayu kls I Bayam , penutup / Daun Papan Jati 300,000.00
* Rangka kayu Jati , penutup / Daun Papan Jati 300,000.00

. Daun Pintu Panil Papan bh ukr. 0,82 x 2,0 m s/d 2.10 m


bahan kayu kls I, disain standar sesuai gambar 350,000.00

8 Daun Pintu Panil Papan ukr. 0,92 x 2,0 m s/d 2.10 m


bahan kayu kls I, disain standar sesuai gambar 1,500,000.00
. Daun Pintu Double Teakwood bh ukr 0,82 x 2,0 m s/d 2.10 m
bahan kayu kls I Bayam , disain standar sesuai gambar 850,000.00

. Daun Pintu Teakwood bh ukr 0,72 x 2,0 m s/d 2.10 m


Lapis seng Plat. bahan kayu kls I, disain standar sesuai gambar 750,000.00

11 Daun Pintu Trali Papan bh * Ukr. 0.92 x 1.20 m Rangka papan Kls I (Daun pintu Irisan Papan) 1,000,000.00
* Ukr. 0.92 x 1.20 m Rangka papan Jati (Daun pintu Irisan Papan) 1,000,000.00

12 Daun Jendela Panil Kaca bh ukr. 0,62 x 1,25 M


* Bahan kayu kls I Bayam 375,000.00
* Bahan kayu Jati 375,000.00

13 Daun Jendela Panil Kaca bh ukr. 0,62 x 1,52 M s/d ……... M


* Bahan kayu kls I Bayam 475,000.00
* Bahan kayu Jati 475,000.00

. Daun Ventilasi Jendela bh ukr. 0,62 x 1,25 M


Panil Kaca * Bahan kayu kls I Bayam 200,000.00
* Bahan kayu Jati 200,000.00

. Kusen Pintu type I standar bh Ukr. Bersih dalam, tinggi lubang pintu 2,00 m, lebar 0,90 m Harga dihitung per lubang
Ukr Kayu Kosen 5/13 cm Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,92 m 750,000.00
Kayu Kls I, Jenis Bayam

. Kusen Pintu type II standar bh Ukr. Bersih dalam, tinggi lubang pintu 2,00 m, lebar 0,80 m
Ukr Kayu Kosen 5/13 cm Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,80 m 750,000.00 Harga dihitung per lubang
Kayu Kls I, Jenis Bayam

. Kusen Pintu type III standar bh Ukr. Bersih dalam, tinggi lubang pintu 2,00 m, lebar 0,70 m 650,000.00 Harga dihitung per lubang
Ukr Kayu Kosen 5/13 cm Tanpa lubang Ventilasi
Kayu Kls I, Jenis Bayam

. Kusen Pintu Stek bh Ukr. Tinggi 1.00 m 500,000.00 Harga dihitung per lubang
Ukr Kayu Kosen 5/13 cm Kayu Kls I, Jenis Bayam

. Kusen Jendela Type I standar bh Ukr. Bersih dalam, tinggi lubang pintu 1.25 m, lebar 0,60 m
Ukr Kayu Kosen 5/13 cm Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,60 m 500,000.00 Harga dihitung per lubang
Kayu Kls I, Jenis Bayam

. Kusen Jendela Type I standar bh Ukr. Bersih dalam, tinggi lubang pintu 1.50 m, lebar 0,60 m
Ukr Kayu Kosen 5/13 cm Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,60 m 550,000.00 Harga dihitung per lubang
Kayu Kls I, Jenis Bayam

. Kusen BV bh Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,60 m 200,000.00 Harga dihitung per lubang
Ukr Kayu Kosen 5/13 cm Kayu Kls I, Jenis Bayam

. Daun Pintu WC/KM bh Ukr. Pintu Tinggi 2.00 m. Lebar 0.70 m 450,000.00 Harga dihitung per lubang
Daun pintu PVC ( Warna Kayu, Warna Hijau, Biru )

Keterangan : Harga yang dimaksud adalah harga toko / bengkel diluar ongkos angkut

Boru, 18 mai 2011

Disurvey Oleh Pimpinan Irak Bengkel

(………………………………) (Robertus W. Irak)


SURVEY HARGA SATUAN
PROPINSI : NTT TOKO/CV/UD/Perorangan : Toko Teratai
KABUPATEN : FLORES TIMUR ALAMAT : Jln. Niaga 50 - Tlp (0383) 21401 - Larantuka
STATUS : Mei 2011

SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)

1 Besi Beton Ф 5 mm Btg SNI / Standart pjg = 10,30 m 16,000.00


2 Besi Beton Ф 6 mm Btg SNI / Standart pjg = 12 m 27,500.00
3 Besi Beton Ф 6 mm Btg pjg = 10.30 m Banci 16,000.00
4 Besi Beton Ф 8 mm Btg SNI / Standart pjg = 12 m 45,000.00
5 Besi Beton Ф 8 mm Btg pjg = 10.30 m 24,000.00
6 Besi Beton Ф 10 mm Btg SNI / Standart pjg = 12 m 65,000.00
7 Besi Beton Ф 10 mm Btg pjg = 10.30 m Banci 34,000.00
8 Besi Beton Ф 12 mm Btg SNI / Standart pjg = 12 m 97,000.00
9 Besi Beton Ф 10,2 mm Btg pjg = 10.30 m Banci 45,000.00
10 Besi Siku Btg 40. 40. 4 70,000.00
11 Besi Siku Btg 50. 50. 5 90,000.00
12 Kawat Ikat Kg 18,000.00
13 Beugel U Bulat ø 16 mm - 52.cm Bh
14 Beugel U Plat - 60 cm Bh
15 Plat Strip ≠ 5 mm - 40 cm Bh
16 Baut Bulat Angkur ø 12 mm - 10 cm kg 18,000.00
17 Baut Bulat Angkur ø 12 mm - 15 cm kg 18,000.00
18 Baut Bulat Angkur ø 12 mm - 25 cm kg 18,000.00
19 Baut Bulat ø 12 mm - 30 cm kg 18,000.00
20 Ring/Cincin Baut kg 500.00
21 Paku 2-3 cm kg 20,000.00
22 Paku 5 cm kg 14,000.00
23 Paku 7 cm kg 14,000.00
24 Paku 10 cm kg 14,000.00
25 Paku 12 cm kg 14,000.00
26 Paku Beton 7 cm kg 18,000.00
27 Paku Beton 10 cm kg 18,000.00
28 Paku Beton 12 cm kg 18,000.00
29 Paku Seng Kg 18,000.00
30 Seng Gelombang BJLS 0,20 mm Lbr Fumira BJLS 0.20 / 180 x 80 Cm 34,000.00 Gajah Gading
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
31 Seng Gelombang BJLS 0,30 mm Lbr Fumira BJLS 0.30 / 180 x 80 Cm 52,000.00 Gajah Gading
32 Seng Gelombang BJLS 0,20 mm Lbr Lokfom BJLS 0.20 / 180 x 80 Cm Gaja Gading/Gaja King
33 Seng Gelombang BJLS 0,30 mm Lbr Lokfom BJLS 0.30 / 180 x 80 Cm Gaja Gading/Gaja King
34 Seng Gelombang BJLA 0,25 mm Lbr BJLA 0.25 / 180 x 80 Cm Baja Lapis Aluminium
35 Seng plat 30 cm m' Lokfom BJLS 0.20 ( Lebar 30 cm ) 9,500.00
36 Seng plat 30 cm m' Lokfom BJLS 0.30 ( Lebar 30 cm )
37 Seng plat 40 cm m' Lokfom BJLS 0.20 ( Lebar 40 cm ) 13,000.00
38 Seng plat 40 cm m' Lokfom BJLS 0.30 ( Lebar 40 cm )
39 Seng Plat 60 cm m' BJLS 0.20 ( Lebar 60 cm ) 21,000.00
40 Seng Plat 60 cm m' BJLS 0.30 ( Lebar 60 cm )
41 Seng Plat 80 cm m' BJLS 0.20 ( Lebar 80 cm ) 23,000.00
42 Seng Plat 80 cm m' BJLS 0.30 ( Lebar 80 cm )
43 Seng Plat 100 cm m' BJLS 0.30 ( Lebar 100 cm ) 26,000.00
44 Keramik 40 x 40 cm Putih Polos dos Asia Tile 40 cm x 40 cm KW 1 47,000.00
45 Keramik 40 x 40 cm Bermotif dos Kobin 40 cm x 40 cm
46 Keramik 30 x 30 cm Putih Polos dos Asia Tile 30 cm x 30 cm KW 1 37,000.00
47 Keramik 30 x 30 cm Bermotif dos Asia Tile 30 cm x 30 cm KW 1
48 Keramik 30 x 30 cm Bermotif dos AIKAD 30 cm x 30 cm KW 1
49 Keramik 20 x 20 cm Putih Polos Dos Asia Tile 20 cm x 20 cm 47,500.00
50 Keramik 20 x 20 cm Bermotif Dos Asia Tile 20 cm x 20 cm
51 Keramik 20 x 25 cm Bermotif Dos Kobin 20 cm x 25 cm 55,000.00
52 Keramik 20 x 25 cm Bermotif Dos Asia 20 cm x 25 cm
53 Keramik 20 x 25 cm Bermotif Dos Masterina 20 cm x 25 cm
54 Keramik 20 x 25 cm Bermotif Dos IKAD 20 cm x 25 cm
55 Keramik 20 x 25 cm Bertekstur (Wc/Km) Dos IKAD 20 cm x 25 cm 49,500.00 ukuran 20 x 20 cm
56 Keramik 20 x 25 cm Bertekstur (Wc/Km) Dos Asia 20 cm x 25 cm
57 Plint Keramik 10 x 20 cm Bh
58 Tegel Wafel 20 x 25 cm Dos
59 Semen Gersik Zak ukr 50 kg/ sak PPC (Semen Portland Pozolan)
60 Semen Gersik Zak ukr 40 kg/ sak PPC (Semen Portland Pozolan)
61 Semen Tonasa Zak ukr 50 kg/ sak
62 Semen Tonasa Zak ukr 40 kg/ sak
63 Semen Bosowa Zak ukr 50 kg/ sak
64 Semen Bosowa Zak ukr 40 kg/ sak 52,000.00
65 Semen Tiga Roda Zak ukr 40 kg/ sak
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
66 Semen Putih Zak
67 Semen Putih kg 3,000.00
68 Semen Warna ……… kg
69 Kaca Bening 3 mm M2 85,000.00
70 Kaca Riben/Gelap 3 mm M2 95,000.00
71 Kaca Bening 5 mm M2 95,000.00
72 Kaca Riben/Gelap 5 mm M2 110,000.00
73 Tripleks 9 mm Lbr Meranti 125,000.00
74 Tripleks 6 mm Lbr Meranti 77,500.00
75 Tripleks 4 mm Lbr Meranti 55,000.00
76 Tripleks 3 mm Lbr Meranti 42,500.00
77 Teacwood 3 mm Lbr 80,000.00
78 Teacwood 4 mm Lbr
79 Kursi Plastik Bh Napolyon Sandaran Tanpa Lengan
80 Lem Aica-Aibon kg Aries 50,000.00
81 Plamir Tembok kg Arco
82 Plamir Tembok kg Boyo 5 kg 7,000.00 35,000.00
83 Plamir Tembok kg Mexico 5 kg
84 Plamir Tembok kg Master/Weber
85 Dumpul Kayu kg Pedang 5,000.00 25,000.00
86 Dumpul Kayu kg Cawan
87 Politur kg Mowilex
88 Vernis kg 47,500.00
89 Meni Kayu ltr Pedang
90 Meni Besi ltr Pedang 20,000.00
91 Cat Besi / Seng kg Arco
92 Cat Seng kg Matex 15,625.00 62.500 per klg (4 Kg)
93 Cat Seng kg Takaraaf 20,000.00 80.000 per klg (4 Kg)
94 Cat Seng kg Belmas
95 Cat Seng kg Jarum
96 Cat Tembok kg Komilex
97 Cat Tembok kg Matex
98 Cat Tembok kg Mawar
99 Cat Tembok kg Aries
100 Cat Tembok kg Arco
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
101 Cat Kayu kg Varaco
102 Cat Kayu kg Mawar
103 Cat Kayu kg Matex
104 Cat Kayu kg Dextro Lux
105 Cat Kayu kg Avian
106 Cat Kayu kg Emco
107 Minyak Cat/Tinner Ltr Biasa
108 Minyak Cat/Tinner Ltr Spesial (A)
109 Amplas Kayu Lbr Kertas Fuji Kasar No. 2" 3,000.00
110 Amplas Kayu Lbr Kertas Fuji Halus No. 5"
111 Amplas Kayu Lbr Kain Flejug Fox Kasar No. 2"
112 Amplas Kayu Lbr Kain Flejug Fox Halus No. 5"
113 Amplas Besi bh
114 Kwas Biasa 4'' bh Medico 10 cm 10,000.00
115 Kwas Biasa 3'' bh Medico 7 cm 6,000.00
116 Kwas Biasa 2'' bh Medico 5 cm 3,500.00
117 Kwas Biasa 1'' bh Medico 2.5 cm 1,500.00
118 Kwas Biasa 3/4'' bh Medico 2 cm 1,000.00
119 Kwas Biasa 1/2'' bh Medico 1.5 cm
120 Kwas Roll bh Imundex 20,000.00
121 Bak / tempat Cat Tembok bh 15,000.00
122 Ember Air bh Anti Pecah 15,000.00
123 Kunci tanam 2 x Putar bh Yuri Loch Factori Panjang
124 Kunci tanam 2 x Putar bh Fereder
125 Kunci tanam 2 x Putar bh Kuda
126 Kunci tanam 2 x Putar bh Royal 39,000.00
127 Kunci tanam 2 x Putar bh TOP
128 Kunci tanam 2 x Putar bh Yalle
129 Grendel Pintu bh Medico 5,000.00
130 Grendel Pintu bh MDC 2"
131 Grendel Jendela bh Kupu-kupu 15,000.00
132 Grendel Jendela bh RRC
133 Grendel Jendela bh Medico
134 Engsel Pintu bh Hona 4 cm x 3 cm x 3 mm Kuning 30,000.00
135 Engsel Pintu bh Cobra 4 cm x 3 cm x 3 mm Stenlys Stile
136 Engsel Jendela bh Hona 3 cm x 2.5 cm x 2.5 mm Kuning 12,500.00
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
137 Engsel Jendela bh Cobra Stenlys Stile
138 Kait Angin bh Sakura Lipat Kuning 15,000.00
139 Kait Angin bh RRC 20,000.00
140 Kait Angin bh Lipat Kuning
141 Sekring Box bh Broco 1 Lub 17,500.00
142 Sekring Box bh Broco 2 Lub 25,000.00
143 Lampu Phillips 5 watt bh Philips
144 Lampu Phillips 8 watt bh Philips
145 Lampu Phillips 14 watt bh Philips
146 Lampu Phillips 18 watt bh Philips
147 Lampu Phillips 23 watt bh Philips
148 Fiting Lampu bh Broco Tempel Warna Putih
149 Fiting Lampu bh Broco Tempel Warna Hitam
150 Fiting Lampu bh Broco Gantung
151 Saklar Ganda bh Broco Saklar Tanam Seri
152 Saklar Tunggal bh Broco Saklar Tanam Engkel
153 Stop Kontak Lengkap bh Broco
154 Embol Dos bh
155 Kabel Listrik NYM 2 x 1,5 mm Rol Eterna 550,000.00 per 100 m
156 Kabel Listrik NYM 2 x 1,5 mm Rol Blitz
157 Kabel Listrik NYM 2 x 2,5 mm Rol Eterna 775,000.00 per 100 m
158 Kabel Listrik NYM 2 x 2,5 mm Rol Blitz
159 Kabel Listrik NYM 2 x 3.0 mm Rol Eterna
160 Kabel Listrik NYM 2 x 3.0 mm Rol Blitz
161 Klem kabel 10 mm Btg
162 Isolasi Listrik Bh Unible
163 Sekerup 2.5 cm Doz
164 Pipa PVC Ф 5/8" (Pembks Kabel) Bh
165 Pipa PVC 4'' Btg AW Putih
166 Pipa PVC 4'' Btg Maspion Abu-abu / Tebal
167 Pipa PVC 3'' Btg AW Putih
168 Pipa PVC 3'' Btg Maspion Abu-abu / Tebal
169 Pipa PVC 2 1/2'' Btg AW Putih
170 Pipa PVC 2 1/2'' Btg Maspion Abu-abu / Tebal
171 Pipa PVC 2 '' Btg AW Putih
172 Pipa PVC 2 '' Btg Maspion Abu-abu / Tebal
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
173 Pipa PVC 1 1/2'' Btg AW Putih
174 Pipa PVC 1 1/2'' Btg Maspion Abu-abu / Tebal
175 Pipa PVC 1 '' Btg AW Putih
176 Pipa PVC 1 '' Btg Maspion Abu-abu / Tebal
177 Socket PVC 4'' bh
178 Elbow PVC 4'' bh
179 Elbow PVC 1 1/2'' bh
180 Socket PVC 1 1/2'' bh
181 Tee PVC 1 1/2'' bh
182 Knee / Elbow PVC 1 1/2'' bh
183 Lem Paralon bh
184 Kran air 1/2'' dorong bh
185 Floor drain ( Plastik ) bh Plastik
186 Wastafel / Kizincing bh INA
187 Kloset Jongkok bh INA
188 Kloset Jongkok bh KIA
189 Kloset Duduk bh INA
190 Knee / Elbow GIP dia 1/2" bh
191 Watermur GIP dia 1/2" bh
192 Watermur GIP dia 1" bh
193 Tee GIP dia 1" bh
194 Oversock GIP dia 1"-1/2" bh
195 Oversock GIP dia 1"-1/2" bh
196 Pipa GIP dia 1'' btg
197 Pipa GIP dia 1/2'' btg 95,000.00
198 Socket GIP dia 1/2'' bh
199 Socket GIP dia 1'' bh
200 Tee GIP dia 1/2'' bh
201 Selotip bh
202 Lem Silicon bh
203 Pipa Hawa dia 1 1/2" bh 50 cm
204 Pipa Hawa dia 1 1/2" bh 75 cm

2. PERALATAN
. Cangkul bh 40,000.00
206 Linggis bh Sedang (Tidak Berulir) 40,000.00
207 Pick Weel bh 55,000.00
208 Sekop bh Jo Kondao
209 Sekop bh Cap Mata 52,500.00
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
210 Ember Kecil Biasa (Cor) Rol Anti Pecah
211 Ember Kecil Elastis (Cor) bh Anti Pecah
212 Ember (Campuran) bh Anti Pecah
213 Ember (Campuran) bh Anti Pecah
214 Ember Bak (Untuk Matex) m
215 Sendok Semen Bh
216 Setrika Kayu bh
217 Lat /mistar Alluminium bh
218 Benang Nilon bh Plastik
219 Meteran 5 M bh
220 Hamer Kecil bh
221 Hamer Sedang bh
222 Selang waterpas bh
223 Selang Air set Sandflex
224 Terpal bh 3x4m
225 Terpal bh 4x6m
226 Drom Air bh
227 Tanki Air bh 3300 Liter
228 Tanki Air bh 5000 Liter
229 Gergaji Kayu bh
230 Gagang Gergaji Besi bh
231 Mata Gergaji Waja bh
232 Mata Gergaji Biasa bh
233 Kakatua bh
234 Tang Besar bh
235 Tang Sedang bh
236 Obeng Bunga sedang bh
237 Obeng Plat sedang bh
238 Alat Pemotong Keramik bh
239 Kawat Ayakan halus M'
240 Kawat Ayakan kasar M'
241 Kunci Pipa 1/2'' - 2'' No 26 bh
242 Kunci Pipa 1/2'' - 2'' No 36 bh
243 Kunci Pipa 3'' bh
244 Pisau Dumpul kecil bh
245 Pisau Dumpul besar bh
246 Pisau Plamir kecil bh
247 Pisau Plamir besar bh

Keterangan : Harga yang dimaksud adlah


harga toko diluar ongkos angkut
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
Larantuka, Mei 2011

DISURVEY OLEH PIMPINAN TOKO TERATAI

(..........................................) (...............................)
SURVEY HARGA SATUAN
PROPINSI : NTT TOKO/CV/UD/Perorangan : UD PUTRA FLORES
KABUPATEN : FLORES TIMUR ALAMAT : Jln. Niaga No. 1 (Tlp. 21235) - Larantuka
STATUS : Mei 2011

SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)

I. BAHAN
1 Besi Beton Ф 5 mm Btg SNI / Standart pjg = 10,30 m
2 Besi Beton Ф 6 mm Btg SNI / Standart pjg = 12 m
3 Besi Beton Ф 6 mm Btg pjg = 10.30 m Banci 16,000.00
4 Besi Beton Ф 8 mm Btg SNI / Standart pjg = 12 m
5 Besi Beton Ф 8 mm Btg pjg = 10.30 m 25,000.00
6 Besi Beton Ф 10 mm Btg SNI / Standart pjg = 12 m
7 Besi Beton Ф 10 mm Btg pjg = 10.30 m Banci 36,500.00
8 Besi Beton Ф 12 mm Btg SNI / Standart pjg = 12 m
9 Besi Beton Ф 10,2 mm Btg pjg = 10.30 m Banci 47,500.00
10 Besi Siku Btg 40. 40. 4 85,000.00
11 Besi Siku Btg 50. 50. 5 95,000.00
12 Kawat Ikat Kg 20,000.00
13 Beugel U Bulat ø 16 mm - 52.cm Bh 30,000.00
14 Beugel U Plat - 60 cm Bh 30,000.00
15 Plat Strip ≠ 5 mm - 40 cm Bh 30,000.00
16 Baut Bulat Angkur ø 12 mm - 10 cm kg 3,500.00 18000/Kg
17 Baut Bulat Angkur ø 12 mm - 15 cm kg 4,000.00 18000/Kg
18 Baut Bulat Angkur ø 12 mm - 25 cm kg 5,500.00 18000/Kg
19 Baut Bulat ø 12 mm - 30 cm kg 9,000.00 18000/Kg
20 Ring/Cincin Baut kg 20,000.00 18000/Kg
21 Paku 2-3 cm kg 20,000.00
22 Paku 5 cm kg 13,000.00
23 Paku 7 cm kg 13,000.00
24 Paku 10 cm kg 13,000.00
25 Paku 12 cm kg 13,000.00
26 Paku Beton 7 cm kg 18,000.00
27 Paku Beton 10 cm kg 18,000.00
28 Paku Beton 12 cm kg 18,000.00
29 Paku Seng Kg 18,000.00
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
30 Seng Gelombang BJLS 0,20 mm Lbr Fumira BJLS 0.20 / 180 x 80 Cm
31 Seng Gelombang BJLS 0,30 mm Lbr Fumira BJLS 0.30 / 180 x 80 Cm
32 Seng Gelombang BJLS 0,20 mm Lbr Lokfom BJLS 0.20 / 180 x 80 Cm Gaja Gading/Gaja King 35,000.00
33 Seng Gelombang BJLS 0,30 mm Lbr Lokfom BJLS 0.30 / 180 x 80 Cm Gaja Gading/Gaja King 53,000.00
34 Seng Gelombang BJLA 0,25 mm Lbr BJLA 0.25 / 180 x 80 Cm Baja Lapis Aluminium
35 Seng plat 30 cm m' Lokfom BJLS 0.20 ( Lebar 30 cm ) 10,000.00
36 Seng plat 30 cm m' Lokfom BJLS 0.30 ( Lebar 30 cm )
37 Seng plat 40 cm m' Lokfom BJLS 0.20 ( Lebar 40 cm ) 14,000.00
38 Seng plat 40 cm m' Lokfom BJLS 0.30 ( Lebar 40 cm )
39 Seng Plat 60 cm m' BJLS 0.20 ( Lebar 60 cm ) 21,000.00
40 Seng Plat 60 cm m' BJLS 0.30 ( Lebar 60 cm )
41 Seng Plat 80 cm m' BJLS 0.20 ( Lebar 80 cm ) 28,500.00
42 Seng Plat 80 cm m' BJLS 0.30 ( Lebar 80 cm )
43 Seng Plat 100 cm m' BJLS 0.30 ( Lebar 100 cm )
44 Keramik 40 x 40 cm Putih Polos dos Asia Tile 40 cm x 40 cm KW 1 47,500.00
45 Keramik 40 x 40 cm Bermotif dos Kobin 40 cm x 40 cm
46 Keramik 30 x 30 cm Putih Polos dos Asia Tile 30 cm x 30 cm KW 1 42,500.00
47 Keramik 30 x 30 cm Bermotif dos Asia Tile 30 cm x 30 cm KW 1
48 Keramik 30 x 30 cm Bermotif dos AIKAD 30 cm x 30 cm KW 1
49 Keramik 20 x 20 cm Putih Polos Dos Asia Tile 20 cm x 20 cm 50,000.00
50 Keramik 20 x 20 cm Bermotif Dos Asia Tile 20 cm x 20 cm 50,000.00
51 Keramik 20 x 25 cm Bermotif Dos Kobin 20 cm x 25 cm 55,000.00
52 Keramik 20 x 25 cm Bermotif Dos Asia 20 cm x 25 cm
53 Keramik 20 x 25 cm Bermotif Dos Masterina 20 cm x 25 cm
54 Keramik 20 x 25 cm Bermotif Dos IKAD 20 cm x 25 cm
55 Keramik 20 x 25 cm Bertekstur (Wc/Km) Dos IKAD 20 cm x 25 cm
56 Keramik 20 x 25 cm Bertekstur (Wc/Km) Dos Asia 20 cm x 25 cm
57 Plint Keramik 10 x 20 cm Bh
58 Tegel Wafel 20 x 25 cm Dos
59 Semen Gersik Zak ukr 50 kg/ sak PPC (Semen Portland Pozolan)
60 Semen Gersik Zak ukr 40 kg/ sak PPC (Semen Portland Pozolan)
61 Semen Tonasa Zak ukr 50 kg/ sak
62 Semen Tonasa Zak ukr 40 kg/ sak
63 Semen Bosowa Zak ukr 50 kg/ sak 53,000.00
64 Semen Bosowa Zak ukr 40 kg/ sak 46,000.00
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
65 Semen Tiga Roda Zak ukr 40 kg/ sak
66 Semen Putih Zak
67 Semen Putih kg
68 Semen Warna ……… kg
69 Kaca Bening 3 mm M2 95,000.00
70 Kaca Riben/Gelap 3 mm M2 100,000.00
71 Kaca Bening 5 mm M2 100,000.00
72 Kaca Riben/Gelap 5 mm M2 110,000.00
73 Tripleks 9 mm Lbr Meranti 120,000.00 Sengon
74 Tripleks 6 mm Lbr Meranti 77,500.00 Sengon
75 Tripleks 4 mm Lbr Meranti 56,000.00 Semi Meranti
76 Tripleks 3 mm Lbr Meranti 44,000.00 Semi Meranti
77 Teacwood 3 mm Lbr 80,000.00
78 Teacwood 4 mm Lbr
79 Kursi Plastik Bh Napolyon Sandaran Tanpa Lengan
80 Lem Aica-Aibon kg Aries 47,500.00
81 Plamir Tembok kg Arco
82 Plamir Tembok kg Boyo 5 kg
83 Plamir Tembok kg Mexico 5 kg
84 Plamir Tembok kg Master/Weber 7,000.00 35,000.00
85 Dumpul Kayu kg Pedang 4,400.00 22,000.00
86 Dumpul Kayu kg Cawan -
87 Politur kg Mowilex 47,500.00
88 Vernis kg
89 Meni Kayu ltr Pedang 22,000.00
90 Meni Besi ltr Pedang 22,000.00
91 Cat Besi / Seng kg Arco
92 Cat Seng kg Matex 16,875.00 67.500 per klg (4 Kg)
93 Cat Seng kg Takaraaf
94 Cat Seng kg Belmas
95 Cat Seng kg Jarum
96 Cat Tembok kg Komilex
97 Cat Tembok kg Matex 13,000.00 65.000 per klg (5 Kg)
98 Cat Tembok kg Mawar
99 Cat Tembok kg Aries
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
100 Cat Tembok kg Arco
101 Cat Kayu kg Varaco
102 Cat Kayu kg Mawar
103 Cat Kayu kg Matex
104 Cat Kayu kg Dextro Lux
105 Cat Kayu kg Avian 38,500.00
106 Cat Kayu kg Emco 53,500.00
107 Minyak Cat/Tinner Ltr Biasa 25,000.00
108 Minyak Cat/Tinner Ltr Spesial (A) 31,000.00
109 Amplas Kayu Lbr Kertas Fuji Kasar No. 2" 3,500.00
110 Amplas Kayu Lbr Kertas Fuji Halus No. 5" 3,500.00
111 Amplas Kayu Lbr Kain Flejug Fox Kasar No. 2" 3,500.00
112 Amplas Kayu Lbr Kain Flejug Fox Halus No. 5" 3,500.00
113 Amplas Besi bh
114 Kwas Biasa 4'' bh Medico 10 cm 8,000.00
115 Kwas Biasa 3'' bh Medico 7 cm 5,000.00
116 Kwas Biasa 2'' bh Medico 5 cm 3,500.00
117 Kwas Biasa 1'' bh Medico 2.5 cm 2,500.00
118 Kwas Biasa 3/4'' bh Medico 2 cm 3,000.00
119 Kwas Biasa 1/2'' bh Medico 1.5 cm 2,000.00
120 Kwas Roll bh Imundex 12,000.00
121 Bak / tempat Cat Tembok bh 10,000.00
122 Ember Air bh Anti Pecah 10,000.00
123 Kunci tanam 2 x Putar bh Yuri Loch Factori Panjang 125,000.00
124 Kunci tanam 2 x Putar bh Fereder 175,000.00 Paori
125 Kunci tanam 2 x Putar bh Kuda
126 Kunci tanam 2 x Putar bh Royal
127 Kunci tanam 2 x Putar bh TOP
128 Kunci tanam 2 x Putar bh Yalle
129 Grendel Pintu bh Medico 12,500.00
130 Grendel Pintu bh MDC 2"
131 Grendel Jendela bh Kupu-kupu
132 Grendel Jendela bh RRC
133 Grendel Jendela bh Medico 7,500.00
134 Engsel Pintu bh Hona 4 cm x 3 cm x 3 mm Kuning 20,000.00 Gameo
135 Engsel Pintu bh Cobra 4 cm x 3 cm x 3 mm Stenlys Stile 10,000.00 HPP
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
136 Engsel Jendela bh Hona 3 cm x 2.5 cm x 2.5 mm Kuning 15,000.00 Gameo
137 Engsel Jendela bh Cobra Stenlys Stile 7,500.00 HPP
138 Kait Angin bh Sakura Lipat Kuning 7,500.00
139 Kait Angin bh RRC
140 Kait Angin bh Lipat Kuning
141 Sekring Box bh Broco 1 Lub
142 Sekring Box bh Broco 2 Lub
143 Lampu Phillips 5 watt bh Philips
144 Lampu Phillips 8 watt bh Philips
145 Lampu Phillips 14 watt bh Philips
146 Lampu Phillips 18 watt bh Philips 40,000.00
147 Lampu Phillips 23 watt bh Philips
148 Fiting Lampu bh Broco Tempel Warna Putih
149 Fiting Lampu bh Broco Tempel Warna Hitam
150 Fiting Lampu bh Broco Gantung
151 Saklar Ganda bh Broco Saklar Tanam Seri 20,000.00
152 Saklar Tunggal bh Broco Saklar Tanam Engkel 17,500.00
153 Stop Kontak Lengkap bh Broco 17,500.00
154 Embol Dos bh 4,000.00
155 Kabel Listrik NYM 2 x 1,5 mm Rol Eterna 850,000.00
156 Kabel Listrik NYM 2 x 1,5 mm Rol Blitz
157 Kabel Listrik NYM 2 x 2,5 mm Rol Eterna 950,000.00
158 Kabel Listrik NYM 2 x 2,5 mm Rol Blitz
159 Kabel Listrik NYM 2 x 3.0 mm Rol Eterna
160 Kabel Listrik NYM 2 x 3.0 mm Rol Blitz
161 Klem kabel 10 mm Btg 15,000.00
162 Isolasi Listrik Bh Unible 10,000.00
163 Sekerup 2.5 cm Doz 6,000.00
164 Pipa PVC Ф 5/8" (Pembks Kabel) Bh 10,000.00
165 Pipa PVC 4'' Btg AW Putih 95,000.00 Jenis ABU" AW
166 Pipa PVC 4'' Btg Maspion Abu-abu / Tebal
167 Pipa PVC 3'' Btg AW Putih 75,000.00 Jenis ABU" AW
168 Pipa PVC 3'' Btg Maspion Abu-abu / Tebal
169 Pipa PVC 2 1/2'' Btg AW Putih
170 Pipa PVC 2 1/2'' Btg Maspion Abu-abu / Tebal
171 Pipa PVC 2 '' Btg AW Putih 55,000.00 Jenis ABU" AW
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
172 Pipa PVC 2 '' Btg Maspion Abu-abu / Tebal
173 Pipa PVC 1 1/2'' Btg AW Putih 47,500.00 Jenis ABU" AW
174 Pipa PVC 1 1/2'' Btg Maspion Abu-abu / Tebal
175 Pipa PVC 1 '' Btg AW Putih 40,000.00 Jenis ABU" AW
176 Pipa PVC 1 '' Btg Maspion Abu-abu / Tebal
177 Socket PVC 4'' bh 12,500.00
178 Elbow PVC 4'' bh 15,000.00
179 Elbow PVC 1 1/2'' bh 4,500.00
180 Socket PVC 1 1/2'' bh 4,000.00
181 Tee PVC 1 1/2'' bh 5,000.00
182 Knee / Elbow PVC 1 1/2'' bh 4,500.00
183 Lem Paralon bh 7,500.00
184 Kran air 1/2'' dorong bh 30,000.00 Merek PVC/KN
185 Floor drain ( Plastik ) bh Plastik 25,000.00
186 Wastafel / Kizincing bh INA 375,000.00 Sedang komplit
187 Kloset Jongkok bh INA 150,000.00
188 Kloset Jongkok bh KIA
189 Kloset Duduk bh INA 450,000.00
190 Knee / Elbow GIP dia 1/2" bh 6,000.00
191 Watermur GIP dia 1/2" bh 15,000.00
192 Watermur GIP dia 1" bh 20,000.00
193 Tee GIP dia 1" bh 9,500.00
194 Oversock GIP dia 1"-1/2" bh 12,500.00
195 Oversock GIP dia 1"-1/2" bh 12,500.00
196 Pipa GIP dia 1'' btg
197 Pipa GIP dia 1/2'' btg 95,000.00
198 Socket GIP dia 1/2'' bh 5,000.00
199 Socket GIP dia 1'' bh 7,000.00
200 Tee GIP dia 1/2'' bh 7,500.00
201 Selotip bh 4,000.00
202 Lem Silicon bh 15,000.00
203 Pipa Hawa dia 1 1/2" bh 50 cm 15,000.00
204 Pipa Hawa dia 1 1/2" bh 75 cm 20,000.00

II ALAT
. Cangkul bh
206 Linggis bh Sedang (Tidak Berulir) 55,000.00
207 Pick Weel bh 55,000.00
208 Sekop bh Jo Kondao 65,000.00 merek Amico
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
209 Sekop bh Cap Mata 50,000.00
210 Ember Kecil Biasa (Cor) Rol Anti Pecah 10,000.00
211 Ember Kecil Elastis (Cor) bh Anti Pecah 10,000.00
212 Ember (Campuran) bh Anti Pecah
213 Ember (Campuran) bh Anti Pecah
214 Ember Bak (Untuk Matex) m 10,000.00
215 Sendok Semen Bh 17,500.00
216 Setrika Kayu bh 15,000.00
217 Lat /mistar Alluminium bh
218 Benang Nilon bh Plastik 25,000.00
219 Meteran 5 M bh 17,500.00
220 Hamer Kecil bh 27,500.00
221 Hamer Sedang bh 35,000.00
222 Selang waterpas bh 2,000.00 Per meter
223 Selang Air set Sandflex
224 Terpal bh 3x4m 60,000.00
225 Terpal bh 4x6m 120,000.00
226 Drom Air bh 165,000.00 200 ltr
227 Tanki Air bh 3300 Liter 4,900,000.00
228 Tanki Air bh 5000 Liter 7,400,000.00 5200 ltr
229 Gergaji Kayu bh 40,000.00
230 Gagang Gergaji Besi bh 20,000.00
231 Mata Gergaji Waja bh 15,000.00
232 Mata Gergaji Biasa bh
233 Kakatua bh 17,500.00
234 Tang Besar bh 27,500.00
235 Tang Sedang bh
236 Obeng Bunga sedang bh 25,000.00
237 Obeng Plat sedang bh 6,000.00
238 Alat Pemotong Keramik bh 300,000.00
239 Kawat Ayakan halus M'
240 Kawat Ayakan kasar M' 20,000.00
241 Kunci Pipa 1/2'' - 2'' No 26 bh 20,000.00
242 Kunci Pipa 1/2'' - 2'' No 36 bh 95,000.00
243 Kunci Pipa 3'' bh
244 Pisau Dumpul kecil bh 3,000.00
245 Pisau Dumpul besar bh 5,000.00
246 Pisau Plamir kecil bh 3,000.00
247 Pisau Plamir besar bh 6,000.00

Keterangan : Harga yang dimaksud adlah


harga toko diluar ongkos angkut
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)

Larantuka, 6 Mei 2011

DISURVEY OLEH PIMPINAN UD PUTRA FLORES

( .................................................. ) (.................................................)
SURVEY HARGA SATUAN
PROPINSI : NTT TOKO/CV/UD/Perorangan : Toko Gonzalu
KABUPATEN : FLORES TIMUR ALAMAT : Jln. Negara - Boru Wulanggitang
STATUS : Mei 2011

SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)

I. BAHAN
1 Besi Beton Ф 5 mm Btg SNI / Standart pjg = 10,30 m
2 Besi Beton Ф 6 mm Btg SNI / Standart pjg = 12 m 25,000.00
3 Besi Beton Ф 6 mm Btg pjg = 10.30 m Banci 17,500.00
4 Besi Beton Ф 8 mm Btg SNI / Standart pjg = 12 m 42,500.00
5 Besi Beton Ф 8 mm Btg pjg = 10.30 m 28,500.00
6 Besi Beton Ф 10 mm Btg SNI / Standart pjg = 12 m 62,500.00
7 Besi Beton Ф 10 mm Btg pjg = 10.30 m Banci 37,500.00
8 Besi Beton Ф 12 mm Btg SNI / Standart pjg = 12 m 90,000.00
9 Besi Beton Ф 10,2 mm Btg pjg = 10.30 m Banci 57,500.00
10 Besi Siku Btg 40. 40. 4 145,000.00
11 Besi Siku Btg 50. 50. 5 200,000.00
12 Kawat Ikat Kg 22,500.00
13 Beugel U Bulat ø 16 mm - 52.cm Bh 22,500.00
14 Beugel U Plat - 60 cm Bh 22,500.00
15 Plat Strip ≠ 5 mm - 40 cm Bh 12,500.00
16 Baut Bulat Angkur ø 12 mm - 10 cm kg 4,000.00
17 Baut Bulat Angkur ø 12 mm - 15 cm kg 4,500.00
18 Baut Bulat Angkur ø 12 mm - 25 cm kg 6,000.00
19 Baut Bulat ø 12 mm - 30 cm kg 7,500.00
20 Ring/Cincin Baut kg 4,000.00
21 Paku 2-3 cm kg 25,000.00
22 Paku 5 cm kg 15,000.00
23 Paku 7 cm kg 15,000.00
24 Paku 10 cm kg 15,000.00
25 Paku 12 cm kg 15,000.00
26 Paku Beton 7 cm kg 20,000.00
27 Paku Beton 10 cm kg 20,000.00
28 Paku Beton 12 cm kg 20,000.00
29 Paku Seng Kg 22,500.00
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
30 Seng Gelombang BJLS 0,20 mm Lbr Fumira BJLS 0.20 / 180 x 80 Cm 35,000.00
31 Seng Gelombang BJLS 0,30 mm Lbr Fumira BJLS 0.30 / 180 x 80 Cm 60,000.00
32 Seng Gelombang BJLS 0,20 mm Lbr Lokfom BJLS 0.20 / 180 x 80 Cm Gaja Gading/Gaja King
33 Seng Gelombang BJLS 0,30 mm Lbr Lokfom BJLS 0.30 / 180 x 80 Cm Gaja Gading/Gaja King
34 Seng Gelombang BJLA 0,25 mm Lbr BJLA 0.25 / 180 x 80 Cm Baja Lapis Aluminium
35 Seng plat 30 cm m' Lokfom BJLS 0.20 ( Lebar 30 cm ) 10,000.00
36 Seng plat 30 cm m' Lokfom BJLS 0.30 ( Lebar 30 cm )
37 Seng plat 40 cm m' Lokfom BJLS 0.20 ( Lebar 40 cm ) 12,000.00
38 Seng plat 40 cm m' Lokfom BJLS 0.30 ( Lebar 40 cm )
39 Seng Plat 60 cm m' BJLS 0.20 ( Lebar 60 cm ) 20,000.00
40 Seng Plat 60 cm m' BJLS 0.30 ( Lebar 60 cm )
41 Seng Plat 80 cm m' BJLS 0.20 ( Lebar 80 cm ) 25,000.00
42 Seng Plat 80 cm m' BJLS 0.30 ( Lebar 80 cm )
43 Seng Plat 100 cm m' BJLS 0.30 ( Lebar 100 cm )
44 Keramik 40 x 40 cm Putih Polos dos Asia Tile 40 cm x 40 cm KW 1 47,500.00
45 Keramik 40 x 40 cm Bermotif dos Kobin 40 cm x 40 cm 55,000.00
46 Keramik 30 x 30 cm Putih Polos dos Asia Tile 30 cm x 30 cm KW 1 38,000.00
47 Keramik 30 x 30 cm Bermotif dos Asia Tile 30 cm x 30 cm KW 1 42,000.00
48 Keramik 30 x 30 cm Bermotif dos AIKAD 30 cm x 30 cm KW 1 45,000.00
49 Keramik 20 x 20 cm Putih Polos Dos Asia Tile 20 cm x 20 cm 45,000.00
50 Keramik 20 x 20 cm Bermotif Dos Asia Tile 20 cm x 20 cm 50,000.00
51 Keramik 20 x 25 cm Bermotif Dos Kobin 20 cm x 25 cm 50,000.00
52 Keramik 20 x 25 cm Bermotif Dos Asia 20 cm x 25 cm 47,500.00
53 Keramik 20 x 25 cm Bermotif Dos Masterina 20 cm x 25 cm
54 Keramik 20 x 25 cm Bermotif Dos IKAD 20 cm x 25 cm 55,000.00
55 Keramik 20 x 25 cm Bertekstur (Wc/Km) Dos IKAD 20 cm x 25 cm 55,000.00
56 Keramik 20 x 25 cm Bertekstur (Wc/Km) Dos Asia 20 cm x 25 cm 47,500.00
57 Plint Keramik 10 x 20 cm Bh 7,000.00
58 Tegel Wafel 20 x 25 cm Dos
59 Semen Gersik Zak ukr 50 kg/ sak PPC (Semen Portland Pozolan)
60 Semen Gersik Zak ukr 40 kg/ sak PPC (Semen Portland Pozolan)
61 Semen Tonasa Zak ukr 50 kg/ sak
62 Semen Tonasa Zak ukr 40 kg/ sak
63 Semen Bosowa Zak ukr 50 kg/ sak 60,000.00 Buruh Bongkar @ Rp.1000/zak
64 Semen Bosowa Zak ukr 40 kg/ sak 50,000.00 Buruh Bongkar @ Rp.1000/zak
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
65 Semen Tiga Roda Zak ukr 40 kg/ sak 50,000.00 Buruh Bongkar @ Rp.1000/zak
66 Semen Putih Zak 100,000.00 Buruh Bongkar @ Rp.1000/zak
67 Semen Putih kg 5,000.00
68 Semen Warna ……… kg 12,000.00
69 Kaca Bening 3 mm M2 100,000.00
70 Kaca Riben/Gelap 3 mm M2 125,000.00
71 Kaca Bening 5 mm M2 140,000.00
72 Kaca Riben/Gelap 5 mm M2 145,000.00
73 Tripleks 9 mm Lbr Meranti 122,000.00
74 Tripleks 6 mm Lbr Meranti 87,000.00
75 Tripleks 4 mm Lbr Meranti 65,000.00
76 Tripleks 3 mm Lbr Meranti 50,000.00
77 Teacwood 3 mm Lbr 100,000.00
78 Teacwood 4 mm Lbr
79 Kursi Plastik Bh Napolyon Sandaran Tanpa Lengan 50,000.00
80 Lem Aica-Aibon kg Aries 50,000.00
81 Plamir Tembok kg Arco
82 Plamir Tembok kg Boyo 5 kg 7,500.00 Harga 37.500 per kaleng
83 Plamir Tembok kg Mexico 5 kg
84 Plamir Tembok kg Master/Weber 4,000.00 Harga 20.000 Per Kaleng
85 Dumpul Kayu kg Pedang 4,500.00 Harga 22.500 Per Kaleng
86 Dumpul Kayu kg Cawan
87 Politur kg Mowilex 65,000.00
88 Vernis kg
89 Meni Kayu ltr Pedang 22,500.00
90 Meni Besi ltr Pedang 22,500.00
91 Cat Besi / Seng kg Arco
92 Cat Seng kg Matex
93 Cat Seng kg Takaraaf
94 Cat Seng kg Belmas 20,000.00
95 Cat Seng kg Jarum
96 Cat Tembok kg Komilex
97 Cat Tembok kg Matex 17,000.00
98 Cat Tembok kg Mawar
99 Cat Tembok kg Aries 7,000.00
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
100 Cat Tembok kg Arco
101 Cat Kayu kg Varaco
102 Cat Kayu kg Mawar
103 Cat Kayu kg Matex
104 Cat Kayu kg Dextro Lux
105 Cat Kayu kg Avian 45,000.00
106 Cat Kayu kg Emco 60,000.00
107 Minyak Cat/Tinner Ltr Biasa 25,000.00
108 Minyak Cat/Tinner Ltr Spesial (A) 32,500.00
109 Amplas Kayu Lbr Kertas Fuji Kasar No. 2" 3,000.00
110 Amplas Kayu Lbr Kertas Fuji Halus No. 5" 3,000.00
111 Amplas Kayu Lbr Kain Flejug Fox Kasar No. 2" 3,000.00
112 Amplas Kayu Lbr Kain Flejug Fox Halus No. 5" 3,000.00
113 Amplas Besi bh 3,000.00
114 Kwas Biasa 4'' bh Medico 10 cm 10,000.00
115 Kwas Biasa 3'' bh Medico 7 cm 7,500.00
116 Kwas Biasa 2'' bh Medico 5 cm 5,000.00
117 Kwas Biasa 1'' bh Medico 2.5 cm 3,500.00
118 Kwas Biasa 3/4'' bh Medico 2 cm 2,000.00
119 Kwas Biasa 1/2'' bh Medico 1.5 cm
120 Kwas Roll bh Imundex 15,000.00
121 Bak / tempat Cat Tembok bh 17,500.00
122 Ember Air bh Anti Pecah 17,500.00
123 Kunci tanam 2 x Putar bh Yuri Loch Factori Panjang 135,000.00 Paori
124 Kunci tanam 2 x Putar bh Fereder
125 Kunci tanam 2 x Putar bh Kuda 65,000.00
126 Kunci tanam 2 x Putar bh Royal 130,000.00
127 Kunci tanam 2 x Putar bh TOP
128 Kunci tanam 2 x Putar bh Yalle 65,000.00
129 Grendel Pintu bh Medico 12,000.00
130 Grendel Pintu bh MDC 2"
131 Grendel Jendela bh Kupu-kupu 3,500.00
132 Grendel Jendela bh RRC 3,500.00
133 Grendel Jendela bh Medico 7,000.00
134 Engsel Pintu bh Hona 4 cm x 3 cm x 3 mm Kuning 17,500.00
135 Engsel Pintu bh Cobra 4 cm x 3 cm x 3 mm Stenlys Stile 17,500.00
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
136 Engsel Jendela bh Hona 3 cm x 2.5 cm x 2.5 mm Kuning 12,500.00
137 Engsel Jendela bh Cobra Stenlys Stile 12,500.00
138 Kait Angin bh Sakura Lipat Kuning 9,000.00
139 Kait Angin bh RRC 5,000.00
140 Kait Angin bh Lipat Kuning 7,000.00
141 Sekring Box bh Broco 1 Lub 35,000.00
142 Sekring Box bh Broco 2 Lub 50,000.00
143 Lampu Phillips 5 watt bh Philips 25,000.00
144 Lampu Phillips 8 watt bh Philips 28,500.00
145 Lampu Phillips 14 watt bh Philips 30,000.00
146 Lampu Phillips 18 watt bh Philips 35,000.00
147 Lampu Phillips 23 watt bh Philips 40,000.00
148 Fiting Lampu bh Broco Tempel Warna Putih 10,000.00
149 Fiting Lampu bh Broco Tempel Warna Hitam 4,500.00
150 Fiting Lampu bh Broco Gantung 3,000.00
151 Saklar Ganda bh Broco Saklar Tanam Seri 15,000.00
152 Saklar Tunggal bh Broco Saklar Tanam Engkel 12,000.00
153 Stop Kontak Lengkap bh Broco 15,000.00
154 Embol Dos bh 2,000.00
155 Kabel Listrik NYM 2 x 1,5 mm Rol Eterna 550,000.00
156 Kabel Listrik NYM 2 x 1,5 mm Rol Blitz
157 Kabel Listrik NYM 2 x 2,5 mm Rol Eterna 800,000.00
158 Kabel Listrik NYM 2 x 2,5 mm Rol Blitz
159 Kabel Listrik NYM 2 x 3.0 mm Rol Eterna
160 Kabel Listrik NYM 2 x 3.0 mm Rol Blitz
161 Klem kabel 10 mm Btg 12,000.00
162 Isolasi Listrik Bh Unible 7,500.00
163 Sekerup 2.5 cm Doz 7,000.00
164 Pipa PVC Ф 5/8" (Pembks Kabel) Bh 7,500.00
165 Pipa PVC 4'' Btg AW Putih
166 Pipa PVC 4'' Btg Maspion Abu-abu / Tebal 265,000.00
167 Pipa PVC 3'' Btg AW Putih
168 Pipa PVC 3'' Btg Maspion Abu-abu / Tebal 185,000.00
169 Pipa PVC 2 1/2'' Btg AW Putih
170 Pipa PVC 2 1/2'' Btg Maspion Abu-abu / Tebal 125,000.00
171 Pipa PVC 2 '' Btg AW Putih
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
172 Pipa PVC 2 '' Btg Maspion Abu-abu / Tebal 100,000.00
173 Pipa PVC 1 1/2'' Btg AW Putih
174 Pipa PVC 1 1/2'' Btg Maspion Abu-abu / Tebal 75,000.00
175 Pipa PVC 1 '' Btg AW Putih
176 Pipa PVC 1 '' Btg Maspion Abu-abu / Tebal 40,000.00
177 Socket PVC 4'' bh 22,500.00
178 Elbow PVC 4'' bh 37,000.00
179 Elbow PVC 1 1/2'' bh 6,000.00
180 Socket PVC 1 1/2'' bh 5,000.00
181 Tee PVC 1 1/2'' bh 7,000.00
182 Knee / Elbow PVC 1 1/2'' bh 6,000.00
183 Lem Paralon bh 7,500.00
184 Kran air 1/2'' dorong bh 17,500.00
185 Floor drain ( Plastik ) bh Plastik 12,000.00
186 Wastafel / Kizincing bh INA 275,000.00
187 Kloset Jongkok bh INA 145,000.00
188 Kloset Jongkok bh KIA
189 Kloset Duduk bh INA 400,000.00
190 Knee / Elbow GIP dia 1/2" bh 5,000.00
191 Watermur GIP dia 1/2" bh 12,000.00
192 Watermur GIP dia 1" bh 17,500.00
193 Tee GIP dia 1" bh 10,000.00
194 Oversock GIP dia 1"-1/2" bh 7,500.00
195 Oversock GIP dia 1"-1/2" bh
196 Pipa GIP dia 1'' btg
197 Pipa GIP dia 1/2'' btg
198 Socket GIP dia 1/2'' bh
199 Socket GIP dia 1'' bh
200 Tee GIP dia 1/2'' bh
201 Selotip bh
202 Lem Silicon bh
203 Pipa Hawa dia 1 1/2" bh 50 cm
204 Pipa Hawa dia 1 1/2" bh 75 cm

II ALAT
. Cangkul bh 60,000.00
206 Linggis bh Sedang (Tidak Berulir) 50,000.00
207 Pick Weel bh 60,000.00
208 Sekop bh Jo Kondao 60,000.00
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
209 Sekop bh Cap Mata 75,000.00
210 Ember Kecil Biasa (Cor) Rol Anti Pecah 8,000.00
211 Ember Kecil Elastis (Cor) bh Anti Pecah 10,000.00
212 Ember (Campuran) bh Anti Pecah 10,000.00
213 Ember (Campuran) bh Anti Pecah 10,000.00
214 Ember Bak (Untuk Matex) m 17,500.00
215 Sendok Semen Bh 12,500.00
216 Setrika Kayu bh 15,000.00
217 Lat /mistar Alluminium bh 22,500.00
218 Benang Nilon bh Plastik 10,000.00
219 Meteran 5 M bh 12,000.00
220 Hamer Kecil bh 17,500.00
221 Hamer Sedang bh 25,000.00
222 Selang waterpas bh 3,000.00
223 Selang Air set Sandflex 180,000.00
224 Terpal bh 3x4m 80,000.00
225 Terpal bh 4x6m 150,000.00
226 Drom Air bh 250,000.00
227 Tanki Air bh 3300 Liter 4,500,000.00
228 Tanki Air bh 5000 Liter 6,500,000.00
229 Gergaji Kayu bh 40,000.00
230 Gagang Gergaji Besi bh 27,500.00
231 Mata Gergaji Waja bh 15,000.00
232 Mata Gergaji Biasa bh 3,000.00
233 Kakatua bh 17,500.00
234 Tang Besar bh 30,000.00
235 Tang Sedang bh 12,000.00
236 Obeng Bunga sedang bh 7,500.00
237 Obeng Plat sedang bh 7,500.00
238 Alat Pemotong Keramik bh 135,000.00
239 Kawat Ayakan halus M' 20,000.00
240 Kawat Ayakan kasar M' 20,000.00
241 Kunci Pipa 1/2'' - 2'' No 26 bh 90,000.00
242 Kunci Pipa 1/2'' - 2'' No 36 bh 160,000.00
243 Kunci Pipa 3'' bh 300,000.00
244 Pisau Dumpul kecil bh 4,000.00
245 Pisau Dumpul besar bh 6,000.00
246 Pisau Plamir kecil bh 3,500.00
247 Pisau Plamir besar bh 6,000.00

Keterangan : Harga yang dimaksud adlah


harga toko diluar ongkos angkut
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)

Boru, Mei 2011

DISURVEY OLEH PIMPINAN TOKO GONZALU

(..........................................) (Franky De Class)


SURVEY HARGA SATUAN
PROPINSI : NTT TOKO/CV/UD/Perorangan : Toko Harapan Jaya
KABUPATEN : FLORES TIMUR ALAMAT : Wolorona - Boru Wulanggitang
STATUS : 20 Mei 2011

SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)

I. BAHAN
1 Besi Beton Ф 5 mm Btg SNI / Standart pjg = 10,30 m
2 Besi Beton Ф 6 mm Btg SNI / Standart pjg = 12 m 30,000.00
3 Besi Beton Ф 6 mm Btg pjg = 10.30 m Banci 20,000.00
4 Besi Beton Ф 8 mm Btg SNI / Standart pjg = 12 m 42,000.00
5 Besi Beton Ф 8 mm Btg pjg = 10.30 m Banci 30,000.00
6 Besi Beton Ф 10 mm Btg SNI / Standart pjg = 12 m 65,000.00
7 Besi Beton Ф 10 mm Btg pjg = 10.30 m Banci 40,000.00
8 Besi Beton Ф 12 mm Btg SNI / Standart pjg = 12 m 90,000.00
9 Besi Beton Ф 10,2 mm Btg pjg = 10.30 m Banci 60,000.00
10 Besi Siku Btg 40. 40. 4 150,000.00
11 Besi Siku Btg 50. 50. 5 230,000.00
12 Kawat Ikat Kg 25,000.00
13 Beugel U Bulat ø 16 mm - 52.cm Bh
14 Beugel U Plat - 60 cm Bh
15 Plat Strip ≠ 5 mm - 40 cm Bh
16 Baut Bulat Angkur ø 12 mm - 10 cm kg 25,000.00
17 Baut Bulat Angkur ø 12 mm - 15 cm kg
18 Baut Bulat Angkur ø 12 mm - 25 cm kg
19 Baut Bulat ø 12 mm - 30 cm kg 25,000.00
20 Ring/Cincin Baut kg 25,000.00
21 Paku 2-3 cm kg 20,000.00
22 Paku 5 cm kg 17,000.00
23 Paku 7 cm kg 17,000.00
24 Paku 10 cm kg 17,000.00
25 Paku 12 cm kg 17,000.00
26 Paku Beton 7 cm kg 20,000.00
27 Paku Beton 10 cm kg 20,000.00
28 Paku Beton 12 cm kg 20,000.00
29 Paku Seng Kg 25,000.00
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
30 Seng Gelombang BJLS 0,20 mm Lbr Fumira BJLS 0.20 / 180 x 80 Cm 38,500.00
31 Seng Gelombang BJLS 0,30 mm Lbr Fumira BJLS 0.30 / 180 x 80 Cm 62,000.00
32 Seng Gelombang BJLS 0,20 mm Lbr Lokfom BJLS 0.20 / 180 x 80 Cm Gaja Gading/Gaja King
33 Seng Gelombang BJLS 0,30 mm Lbr Lokfom BJLS 0.30 / 180 x 80 Cm Gaja Gading/Gaja King
34 Seng Gelombang BJLA 0,25 mm Lbr BJLA 0.25 / 180 x 80 Cm Baja Lapis Aluminium
35 Seng plat 30 cm m' Lokfom BJLS 0.20 ( Lebar 30 cm ) 12,000.00
36 Seng plat 30 cm m' Lokfom BJLS 0.30 ( Lebar 30 cm )
37 Seng plat 40 cm m' Lokfom BJLS 0.20 ( Lebar 40 cm ) 15,000.00
38 Seng plat 40 cm m' Lokfom BJLS 0.30 ( Lebar 40 cm )
39 Seng Plat 60 cm m' BJLS 0.20 ( Lebar 60 cm ) 25,000.00
40 Seng Plat 60 cm m' BJLS 0.30 ( Lebar 60 cm )
41 Seng Plat 80 cm m' BJLS 0.20 ( Lebar 80 cm ) 30,000.00
42 Seng Plat 80 cm m' BJLS 0.30 ( Lebar 80 cm )
43 Seng Plat 100 cm m' BJLS 0.30 ( Lebar 100 cm )
44 Keramik 40 x 40 cm Putih Polos dos Asia Tile 40 cm x 40 cm KW 1 50,000.00
45 Keramik 40 x 40 cm Bermotif dos Kobin 40 cm x 40 cm
46 Keramik 30 x 30 cm Putih Polos dos Asia Tile 30 cm x 30 cm KW 1 40,000.00
47 Keramik 30 x 30 cm Bermotif dos Asia Tile 30 cm x 30 cm KW 1 47,500.00
48 Keramik 30 x 30 cm Bermotif dos AIKAD 30 cm x 30 cm KW 1 45,000.00
49 Keramik 20 x 20 cm Putih Polos Dos Asia Tile 20 cm x 20 cm
50 Keramik 20 x 20 cm Bermotif Dos Asia Tile 20 cm x 20 cm
51 Keramik 20 x 25 cm Bermotif Dos Kobin 20 cm x 25 cm
52 Keramik 20 x 25 cm Bermotif Dos Asia 20 cm x 25 cm
53 Keramik 20 x 25 cm Bermotif Dos Masterina 20 cm x 25 cm
54 Keramik 20 x 25 cm Bermotif Dos IKAD 20 cm x 25 cm
55 Keramik 20 x 25 cm Bertekstur (Wc/Km) Dos IKAD 20 cm x 25 cm
56 Keramik 20 x 25 cm Bertekstur (Wc/Km) Dos Asia 20 cm x 25 cm
57 Plint Keramik 10 x 20 cm Bh 7,500.00
58 Tegel Wafel 20 x 25 cm Dos
59 Semen Gersik Zak ukr 50 kg/ sak PPC (Semen Portland Pozolan)
60 Semen Gersik Zak ukr 40 kg/ sak PPC (Semen Portland Pozolan)
61 Semen Tonasa Zak ukr 50 kg/ sak
62 Semen Tonasa Zak ukr 40 kg/ sak
63 Semen Bosowa Zak ukr 50 kg/ sak 60,000.00
64 Semen Bosowa Zak ukr 40 kg/ sak 50,000.00
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
65 Semen Tiga Roda Zak ukr 40 kg/ sak
66 Semen Putih Zak 110,000.00
67 Semen Putih kg 5,000.00
68 Semen Warna ……… kg 15,000.00
69 Kaca Bening 3 mm M2 130,000.00
70 Kaca Riben/Gelap 3 mm M2 140,000.00
71 Kaca Bening 5 mm M2 150,000.00
72 Kaca Riben/Gelap 5 mm M2 160,000.00
73 Tripleks 9 mm Lbr Meranti 125,000.00
74 Tripleks 6 mm Lbr Meranti 80,000.00
75 Tripleks 4 mm Lbr Meranti 65,000.00
76 Tripleks 3 mm Lbr Meranti 52,000.00
77 Teacwood 3 mm Lbr 100,000.00
78 Teacwood 4 mm Lbr
79 Kursi Plastik Bh Napolyon Sandaran Tanpa Lengan
80 Lem Aica-Aibon kg Aries 50,000.00
81 Plamir Tembok kg Arco
82 Plamir Tembok kg Boyo 5 kg 9,000.00 45,000.00
83 Plamir Tembok kg Mexico 5 kg
84 Plamir Tembok kg Master/Weber
85 Dumpul Kayu kg Pedang 5,000.00 25,000.00
86 Dumpul Kayu kg Cawan
87 Politur kg Mowilex
88 Vernis kg
89 Meni Kayu ltr Pedang 25,000.00
90 Meni Besi ltr Pedang
91 Cat Besi / Seng kg Arco
92 Cat Seng kg Matex
93 Cat Seng kg Takaraaf
94 Cat Seng kg Belmas
95 Cat Seng kg Jarum
96 Cat Tembok kg Komilex
97 Cat Tembok kg Matex 17,000.00 85,000.00
98 Cat Tembok kg Mawar
99 Cat Tembok kg Aries
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
100 Cat Tembok kg Arco
101 Cat Kayu kg Varaco
102 Cat Kayu kg Mawar
103 Cat Kayu kg Matex
104 Cat Kayu kg Dextro Lux
105 Cat Kayu kg Avian
106 Cat Kayu kg Emco 65,000.00
107 Minyak Cat/Tinner Ltr Biasa
108 Minyak Cat/Tinner Ltr Spesial (A) 35,000.00
109 Amplas Kayu Lbr Kertas Fuji Kasar No. 2"
110 Amplas Kayu Lbr Kertas Fuji Halus No. 5"
111 Amplas Kayu Lbr Kain Flejug Fox Kasar No. 2"
112 Amplas Kayu Lbr Kain Flejug Fox Halus No. 5"
113 Amplas Besi bh
114 Kwas Biasa 4'' bh Medico 10 cm 10,000.00
115 Kwas Biasa 3'' bh Medico 7 cm 7,000.00
116 Kwas Biasa 2'' bh Medico 5 cm 5,000.00
117 Kwas Biasa 1'' bh Medico 2.5 cm
118 Kwas Biasa 3/4'' bh Medico 2 cm
119 Kwas Biasa 1/2'' bh Medico 1.5 cm
120 Kwas Roll bh Imundex 15,000.00
121 Bak / tempat Cat Tembok bh 15,000.00
122 Ember Air bh Anti Pecah
123 Kunci tanam 2 x Putar bh Yuri Loch Factori Panjang 135,000.00 Paori
124 Kunci tanam 2 x Putar bh Fereder
125 Kunci tanam 2 x Putar bh Kuda 90,000.00
126 Kunci tanam 2 x Putar bh Royal
127 Kunci tanam 2 x Putar bh TOP 60,000.00
128 Kunci tanam 2 x Putar bh Yalle 75,000.00
129 Grendel Pintu bh Medico 15,000.00 Merek King
130 Grendel Pintu bh MDC 2"
131 Grendel Jendela bh Kupu-kupu 7,500.00 Merek King
132 Grendel Jendela bh RRC
133 Grendel Jendela bh Medico
134 Engsel Pintu bh Hona 4 cm x 3 cm x 3 mm Kuning 15,000.00 Merek King
135 Engsel Pintu bh Cobra 4 cm x 3 cm x 3 mm Stenlys Stile
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
136 Engsel Jendela bh Hona 3 cm x 2.5 cm x 2.5 mm Kuning 10,000.00 Merek King
137 Engsel Jendela bh Cobra Stenlys Stile
138 Kait Angin bh Sakura Lipat Kuning
139 Kait Angin bh RRC 20,000.00 merek King
140 Kait Angin bh Lipat Kuning
141 Sekring Box bh Broco 1 Lub 40,000.00
142 Sekring Box bh Broco 2 Lub
143 Lampu Phillips 5 watt bh Philips
144 Lampu Phillips 8 watt bh Philips
145 Lampu Phillips 14 watt bh Philips
146 Lampu Phillips 18 watt bh Philips
147 Lampu Phillips 23 watt bh Philips 45,000.00 20 watt
148 Fiting Lampu bh Broco Tempel Warna Putih 15,000.00
149 Fiting Lampu bh Broco Tempel Warna Hitam
150 Fiting Lampu bh Broco Gantung
151 Saklar Ganda bh Broco Saklar Tanam Seri 20,000.00
152 Saklar Tunggal bh Broco Saklar Tanam Engkel 15,000.00
153 Stop Kontak Lengkap bh Broco 17,500.00
154 Embol Dos bh 2,500.00
155 Kabel Listrik NYM 2 x 1,5 mm Rol Eterna 575,000.00
156 Kabel Listrik NYM 2 x 1,5 mm Rol Blitz
157 Kabel Listrik NYM 2 x 2,5 mm Rol Eterna 850,000.00
158 Kabel Listrik NYM 2 x 2,5 mm Rol Blitz
159 Kabel Listrik NYM 2 x 3.0 mm Rol Eterna
160 Kabel Listrik NYM 2 x 3.0 mm Rol Blitz
161 Klem kabel 10 mm Btg 15,000.00
162 Isolasi Listrik Bh Unible 10,000.00
163 Sekerup 2.5 cm Doz 10,000.00
164 Pipa PVC Ф 5/8" (Pembks Kabel) Bh
165 Pipa PVC 4'' Btg AW Putih
166 Pipa PVC 4'' Btg Maspion Abu-abu / Tebal
167 Pipa PVC 3'' Btg AW Putih
168 Pipa PVC 3'' Btg Maspion Abu-abu / Tebal 70,000.00
169 Pipa PVC 2 1/2'' Btg AW Putih
170 Pipa PVC 2 1/2'' Btg Maspion Abu-abu / Tebal
171 Pipa PVC 2 '' Btg AW Putih
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
172 Pipa PVC 2 '' Btg Maspion Abu-abu / Tebal 50,000.00
173 Pipa PVC 1 1/2'' Btg AW Putih
174 Pipa PVC 1 1/2'' Btg Maspion Abu-abu / Tebal 35,000.00
175 Pipa PVC 1 '' Btg AW Putih
176 Pipa PVC 1 '' Btg Maspion Abu-abu / Tebal
177 Socket PVC 4'' bh
178 Elbow PVC 4'' bh
179 Elbow PVC 1 1/2'' bh
180 Socket PVC 1 1/2'' bh
181 Tee PVC 1 1/2'' bh
182 Knee / Elbow PVC 1 1/2'' bh 5,000.00 maspion
183 Lem Paralon bh 6,000.00
184 Kran air 1/2'' dorong bh
185 Floor drain ( Plastik ) bh Plastik 30,000.00 aluminium
186 Wastafel / Kizincing bh INA 300,000.00
187 Kloset Jongkok bh INA 150,000.00
188 Kloset Jongkok bh KIA
189 Kloset Duduk bh INA
190 Knee / Elbow GIP dia 1/2" bh
191 Watermur GIP dia 1/2" bh 12,500.00
192 Watermur GIP dia 1" bh 20,000.00
193 Tee GIP dia 1" bh 12,500.00
194 Oversock GIP dia 1"-1/2" bh 8,500.00
195 Oversock GIP dia 1"-1/2" bh 8,500.00
196 Pipa GIP dia 1'' btg 185,000.00 medium B - BSA Super Tebal
197 Pipa GIP dia 1/2'' btg 125,000.00 medium B - BSA Super Tebal
198 Socket GIP dia 1/2'' bh 4,000.00
199 Socket GIP dia 1'' bh 7,000.00
200 Tee GIP dia 1/2'' bh 6,000.00
201 Selotip bh
202 Lem Silicon bh
203 Pipa Hawa dia 1 1/2" bh 50 cm
204 Pipa Hawa dia 1 1/2" bh 75 cm

ALAT
205 Cangkul bh
206 Linggis bh Sedang (Tidak Berulir) 50,000.00
207 Pick Weel bh 60,000.00
208 Sekop bh Jo Kondao 55,000.00
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)
209 Sekop bh Cap Mata
210 Ember Kecil Biasa (Cor) Rol Anti Pecah 10,000.00
211 Ember Kecil Elastis (Cor) bh Anti Pecah
212 Ember (Campuran) bh Anti Pecah
213 Ember (Campuran) bh Anti Pecah
214 Ember Bak (Untuk Matex) m
215 Sendok Semen Bh
216 Setrika Kayu bh
217 Lat /mistar Alluminium bh
218 Benang Nilon bh Plastik 10,000.00
219 Meteran 5 M bh 15,000.00
220 Hamer Kecil bh
221 Hamer Sedang bh 45,000.00
222 Selang waterpas bh 3,000.00 per meter
223 Selang Air set Sandflex 175,000.00 Roll
224 Terpal bh 3x4m 75,000.00
225 Terpal bh 4x6m 145,000.00
226 Drom Air bh
227 Tanki Air bh 3300 Liter 4,750,000.00
228 Tanki Air bh 5000 Liter 6,000,000.00
229 Gergaji Kayu bh
230 Gagang Gergaji Besi bh
231 Mata Gergaji Waja bh
232 Mata Gergaji Biasa bh
233 Kakatua bh 30,000.00
234 Tang Besar bh 20,000.00
235 Tang Sedang bh 17,500.00
236 Obeng Bunga sedang bh 10,000.00
237 Obeng Plat sedang bh 10,000.00
238 Alat Pemotong Keramik bh 350,000.00
239 Kawat Ayakan halus M'
240 Kawat Ayakan kasar M'
241 Kunci Pipa 1/2'' - 2'' No 26 bh
242 Kunci Pipa 1/2'' - 2'' No 36 bh
243 Kunci Pipa 3'' bh
244 Pisau Dumpul kecil bh
245 Pisau Dumpul besar bh
246 Pisau Plamir kecil bh
247 Pisau Plamir besar bh 6,000.00

Keterangan : Harga yang dimaksud adlah


harga toko diluar ongkos angkut
SPESIFIKASI
ONGKOS ANGKUT KE
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT LOKASI KETERANGAN
MEREK UKURAN JENIS KUALITAS
(Rp) (Rp)

Boru, 20 Mei 2011

DISURVEY OLEH PIMPINAN TOKO GONZALU

(Pertus Aryo Boleng) (Blasius Nong T)


SURVEY HARGA SATUAN
PROPINSI : NTT CV/UD/Perorangan : Bengkel Berlian Karya
KABUPATEN : FLORES TIMUR ALAMAT : Larantuka, Kmapung Tengah-PTWB
STATUS : Mei 2011

ONGKOS ANGKUT
HARGA SATUAN KE LOKASI
NO NAMA BAHAN/ALAT SAT SPESIFIKASI KETERANGAN

(Rp) (Rp)
A PERMAINAN EDUKATIF LUAR
1 Seluncuran Set Pipa Ø 1 1/2" + plat etsel 2,500,000.00
2 Seluncur + Rumah Set Pipa Ø 1 1/2" + plat etsel 3,500,000.00
3 Seluncuran Dua Arah Set Pipa Ø 1 1/2" + plat etsel 4,500,000.00
4 Jungkat Jangkit Set Papan Kls I + Pipa Ø 1 1/2" 1,500,000.00
5 Ayunan Super + Tenda Set Pipa Ø 1 1/2" + plat etsel (kursi sepasang) 3,000,000.00
6 Ayuanan Besar Set Pipa Ø 1 1/2" + plat etsel (dua dudukan) 1,750,000.00
7 Ayunan Sedang Set Pipa Ø 1 1/2" + plat etsel 1,500,000.00
8 Ayunan Kecil Set Pipa Ø 1 1/2" + plat etsel 1,250,000.00
9 Ayunan Rantai Set Pipa Ø 1 1/2" + plat etsel 1,500,000.00
10 Bola Dunia Set Pipa Ø 1 1/2" + plat etsel 3,500,000.00
11 Bola Keranjang Set Pipa Ø 1 1/2" -
12 Jembatan Goyang Set Plat strip + Pipa Ø 1 1/2" 2,000,000.00
13 Tangga Majemuk Set Pipa Ø 1 1/2" 3,000,000.00
14 Tangga pelangi Set Pipa Ø 1 1/2" 1,750,000.00
15 Gelas Putar Set Pipa Ø 3/4" + Plat 3,000,000.00
16 Gelas Putar + Tenda Set Pipa Ø 3/4" + kain tenda 3,500,000.00
17 Bak Pasir Set -
18 Bak Air Set -
19 Papan Titian Set Papan Kls I 750,000.00
20 Kereta Dorong Set Plastik 500,000.00
21 Sepeda Roda Set Jadi + Pabrik (Besi + Plastik) 750,000.00
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT SPESIFIKASI KE LOKASI KETERANGAN

(Rp) (Rp)
22 Taman Lalulintas Set -
23 Panjat Tebing Set -
24 Akuarium Lengkap Set 1,000,000.00
25 Timbangan Set 750,000.00

B PERMAINAN EDUKATIF DALAM


1 Balok Bangunan Set 50,000.00
2 Mainan Konstruksi Set 50,000.00
3 Lek Punlle Set 50,000.00
4 Permainan Lego Set 50,000.00
5 Permaianan Alat Pertukangan Set 50,000.00
6 Kotak Menara Set 50,000.00
7 Menara Gelang Set 50,000.00

C PERMAINAN MANIPULATIF
1 Mozaika Set -
2 Nuansa Warna Set 60,000.00
3 Papan Jamur Set 50,000.00
4 Lek Puzzio Set 50,000.00
5 Papan Geometri Set 40,000.00
6 Permaianan Lotto Set 40,000.00
7 Pohon Hitung Set 10,000.00
8 Kotak Hitung Set 10,000.00
9 Kotak Merjan Set 25,000.00
10 Kubus Berpola Set 50,000.00
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT SPESIFIKASI KE LOKASI KETERANGAN

(Rp) (Rp)

D PERMAINAN KESENIAN
1 Gitar Kecil Bh Plastik/kain 75,000.00
2 Pangung Sandiwara Boneka Set Plastik/kain 45,000.00
3 Boneka Berbentuk Orang Bh Plastik/kain 45,000.00
4 Boneka Berbentuk Binatang Bh Plastik/kain 75,000.00

Larantuka, 9 Mei 2011

PIMPINAN BERLIAN BENGKEL


DISURVEY OLEH

(YOS M. WITIN)
(.................................................)
SURVEY HARGA SATUAN
PROPINSI : NTT CV/UD/Perorangan : Dua Kembar
KABUPATEN : FLORES TIMUR ALAMAT : Postoh- Larantuka
STATUS : 18 Maret 2011

ONGKOS ANGKUT
HARGA SATUAN KE LOKASI
NO NAMA BAHAN/ALAT SAT SPESIFIKASI KETERANGAN

(Rp) (Rp)
A PERMAINAN EDUKATIF LUAR
1 Seluncuran Set Pipa Ø 1 1/2" + plat etsel 3,700,000.00
2 Seluncur + Rumah Set Pipa Ø 1 1/2" + plat etsel
3 Seluncuran Dua Arah Set Pipa Ø 1 1/2" + plat etsel
4 Jungkat Jangkit Set Papan Kls I + Pipa Ø 1 1/2" 2,600,000.00
5 Ayunan Super + Tenda Set Pipa Ø 1 1/2" + plat etsel (kursi sepasang)
6 Ayuanan Besar Set Pipa Ø 1 1/2" + plat etsel (dua dudukan) 4,200,000.00
7 Ayunan Sedang Set Pipa Ø 1 1/2" + plat etsel
8 Ayunan Kecil Set Pipa Ø 1 1/2" + plat etsel
9 Ayunan Rantai Set Pipa Ø 1 1/2" + plat etsel
10 Bola Dunia Set Pipa Ø 1 1/2" + plat etsel
11 Bola Keranjang Set Pipa Ø 1 1/2"
12 Jembatan Goyang Set Plat strip + Pipa Ø 1 1/2"
13 Tangga Majemuk Set Pipa Ø 1 1/2"
14 Tangga pelangi Set Pipa Ø 1 1/2" 3,500,000.00
15 Gelas Putar Mangkuk Putar Set Pipa Ø 3/4" + Plat 5,200,000.00
16 Gelas Putar + Tenda Set Pipa Ø 3/4" + kain tenda
17 Bak Pasir Set
18 Bak Air Set
19 Papan Titian Set Papan Kls I
20 Kereta Dorong Set Plastik
21 Sepeda Roda Set Jadi + Pabrik (Besi + Plastik)
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT SPESIFIKASI KE LOKASI KETERANGAN

(Rp) (Rp)
22 Taman Lalulintas Set
23 Panjat Tebing Set
24 Akuarium Lengkap Set 750,000.00
25 Timbangan Set 100,000.00

B PERMAINAN EDUKATIF DALAM


1 Balok Bangunan Set 80,000.00
2 Mainan Konstruksi Set
3 Lek Punlle Set
4 Permainan Lego Set
5 Permaianan Alat Pertukangan Set 80,000.00
6 Kotak Menara Set
7 Menara Gelang Set 150,000.00

C PERMAINAN MANIPULATIF
1 Mozaika Set
2 Nuansa Warna Set
3 Papan Jamur Set
4 Lek Puzzio Set
5 Papan Geometri Set
6 Permaianan Lotto Set
7 Pohon Hitung Set
8 Kotak Hitung Set
9 Kotak Merjan Set
10 Kubus Berpola Set
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT SPESIFIKASI KE LOKASI KETERANGAN

(Rp) (Rp)

D PERMAINAN KESENIAN
1 Gitar Kecil Bh Plastik/kain 150,000.00
2 Pangung Sandiwara Boneka Set Plastik/kain
3 Boneka Berbentuk Orang Bh Plastik/kain
4 Boneka Berbentuk Binatang Bh Plastik/kain

Larantuka, 9 Mei 2011

PIMPINAN BERLIAN BENGKEL


DISURVEY OLEH

(JAKA ISMADI)
(.................................................)
SURVEY HARGA SATUAN
PROPINSI : NTT CV/UD/Perorangan : Dua Kembar
KABUPATEN : FLORES TIMUR ALAMAT : Postoh- Larantuka
STATUS : 18 Maret 2011

ONGKOS ANGKUT
HARGA SATUAN KE LOKASI
NO NAMA BAHAN/ALAT SAT SPESIFIKASI KETERANGAN

(Rp) (Rp)
A PERMAINAN EDUKATIF LUAR
1 Seluncuran Set Pipa Ø 1 1/2" + plat etsel 3,700,000.00
2 Seluncur + Rumah Set Pipa Ø 1 1/2" + plat etsel
3 Seluncuran Dua Arah Set Pipa Ø 1 1/2" + plat etsel
4 Jungkat Jangkit Set Papan Kls I + Pipa Ø 1 1/2" 2,600,000.00
5 Ayunan Super + Tenda Set Pipa Ø 1 1/2" + plat etsel (kursi sepasang)
6 Ayuanan Besar Set Pipa Ø 1 1/2" + plat etsel (dua dudukan) 4,200,000.00
7 Ayunan Sedang Set Pipa Ø 1 1/2" + plat etsel
8 Ayunan Kecil Set Pipa Ø 1 1/2" + plat etsel
9 Ayunan Rantai Set Pipa Ø 1 1/2" + plat etsel
10 Bola Dunia Set Pipa Ø 1 1/2" + plat etsel
11 Bola Keranjang Set Pipa Ø 1 1/2"
12 Jembatan Goyang Set Plat strip + Pipa Ø 1 1/2"
13 Tangga Majemuk Set Pipa Ø 1 1/2"
14 Tangga pelangi Set Pipa Ø 1 1/2" 3,500,000.00
15 Gelas Putar Mangkuk Putar Set Pipa Ø 3/4" + Plat 5,200,000.00
16 Gelas Putar + Tenda Set Pipa Ø 3/4" + kain tenda
17 Bak Pasir Set
18 Bak Air Set
19 Papan Titian Set Papan Kls I
20 Kereta Dorong Set Plastik
21 Sepeda Roda Set Jadi + Pabrik (Besi + Plastik)
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT SPESIFIKASI KE LOKASI KETERANGAN

(Rp) (Rp)
22 Taman Lalulintas Set
23 Panjat Tebing Set
24 Akuarium Lengkap Set
25 Timbangan Set

B PERMAINAN EDUKATIF DALAM


1 Balok Bangunan Set
2 Mainan Konstruksi Set
3 Lek Punlle Set
4 Permainan Lego Set
5 Permaianan Alat Pertukangan Set
6 Kotak Menara Set
7 Menara Gelang Set

C PERMAINAN MANIPULATIF
1 Mozaika Set
2 Nuansa Warna Set
3 Papan Jamur Set
4 Lek Puzzio Set
5 Papan Geometri Set
6 Permaianan Lotto Set
7 Pohon Hitung Set
8 Kotak Hitung Set
9 Kotak Merjan Set
10 Kubus Berpola Set
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/ALAT SAT SPESIFIKASI KE LOKASI KETERANGAN

(Rp) (Rp)

D PERMAINAN KESENIAN
1 Gitar Kecil Bh Plastik/kain
2 Pangung Sandiwara Boneka Set Plastik/kain
3 Boneka Berbentuk Orang Bh Plastik/kain
4 Boneka Berbentuk Binatang Bh Plastik/kain

Larantuka, 9 Mei 2011

PIMPINAN BERLIAN BENGKEL


DISURVEY OLEH

(YOS M. WITIN)
(.................................................)
SURVEY HARGA SATUAN UPAH
PROPINSI : NTT
KABUPATEN : FLORES TIMUR
KECAMATAN : WULANGGITANG STATUS : ……………………..2011

HARGA SATUAN
NO NAMA TENAGA KERJA SAT SPESIFIKASI PARAF KETERANGAN
(RP.)

1 / Hari Tukang Batu Per hari = 6 Jam kerja efektif (1 HOK)

2 / Hari Tukang Kayu Per hari = 6 Jam kerja efektif (1 HOK)

3 / Hari Tukang Keramik Per hari = 6 Jam kerja efektif (1 HOK)

4 / Hari Tukang Cat Per hari = 6 Jam kerja efektif (1 HOK)

5 / Hari Pembantu Tukang Per hari = 6 Jam kerja efektif (1 HOK)

6 /Titik 350,000.00 Tukang Listrik Bahan ditanggung oleh Instalatir, selain bola lampu

HARGA SATUAN
NO. UPAH PEKERJAAN SAT. SPESIFIKASI KETERANGAN
(RP)

1 Pemasangan Meteran Listrik / Paket 2,800,000.00 Daya 900 VA Bonus Box Sekring, instalasi 3 titik lampu

2 Pemasangan Meteran Listrik / Paket 3,200,000.00 Daya 1300 VA Bonus Box Sekring, instalasi 3 titik lampu

3 Pemasangan Meteran Listrik / Paket Daya………………..

……………………………., …………………..2011

Disurvey Oleh

(.......................................................)
HARGA SATUAN
NO NAMA TENAGA KERJA SAT SPESIFIKASI PARAF KETERANGAN
(RP.)

SURVEY HARGA SATUAN UPAH

PROPINSI : NTT
KABUPATEN : FLORES TIMUR
KECAMATAN : WULANGGITANG STATUS : ……………………..2011

HARGA SATUAN
NO NAMA TENAGA KERJA SAT SPESIFIKASI PARAF KETERANGAN
(RP.)

1 / Hari Tukang Batu Per hari = 6 Jam kerja efektif (1 HOK)

2 / Hari Tukang Kayu Per hari = 6 Jam kerja efektif (1 HOK)

3 / Hari Tukang Keramik Per hari = 6 Jam kerja efektif (1 HOK)

4 / Hari Tukang Cat Per hari = 6 Jam kerja efektif (1 HOK)

5 /Titik Tukang Listrik Bahan ditangung sendiri

HARGA SATUAN
NO. UPAH PEKERJAAN SAT. SPESIFIKASI KETERANGAN
(RP)

1 Pemasangan Meteran Listrik / Paket Daya……………….. Bonus Sekring Box dan instalisi ……… titik lampu

2 Pemasangan Meteran Listrik / Paket Daya……………….. Bonus Sekring Box dan instalisi ……… titik lampu

3 Pemasangan Meteran Listrik / Paket Daya……………….. Bonus Sekring Box dan instalisi ……… titik lampu

……………………………., …………………..2011

Disurvey Oleh

(.......................................................)
HARGA JARAK HARGA ONGKOS JUMLAH JUMLAH
DI ANGKUT ANGKUT ANGKUT HARGA HARGA
NO MATERIAL SATUAN RATA2 RATA2/KM /UNIT TOTAL AKHIR
KE LOKASI KE LOKASI KE LOKASI KE LOKASI KE LOKASI
(Rp.) (KM) (Rp.) (Rp/Km) (Rp) (Rp)
A B C D H I J=HXI K=G+J L
LOKAL
PASIR, BATU, AIR KERJA
1 Pasir pasang M³ 14.00 30.00 0.00 0.00 0.00
2 Pasir urug / Sirtu M³ 14.00 400.00 5,600.00 5,600.00 6,000.00
3 Tanah urug M³ 14.00 400.00 5,600.00 5,600.00 6,000.00
4 Batu 15/20 M³
5 Kerikil uk. 2/3 M³
6 Batu Bata Bh
7 Papan Cor Lbr

Tanggal, ................., .................................

Mengetahui

Ketua Tim Survey CV/TOKO/Perorangan

( .......................................................) ( .......................................................)
PNPM Mandiri - Perdesaan

RENCANA ANGGARAN BIAYA


PEMBANGUNAN GEDUNG POSPAUD DAN PERLENGKAPAN
TAHUN ANGGARAN 2014

PROPINSI : NUSA TENGGARA TIMUR


KABUPATEN : FLORES TIMUR
KECAMATAN : ADONARA TENGAH
DESA : LITE

UPAH TENAGA UPAH TENAGA


NO TENAGA KERJA NO
KERJA (RP/HARI) KERJA (RP/HARI
1 Tukang 50,000.00 3 Pekerja 35,000.00
2 Mandor

HARGA HARGA HARGA JARAK HARGA ONGKOS JUMLAH JUMLAH


DI DI DI ANGKUT ANGKUT ANGKUT HARGA HARGA
NO MATERIAL SATUAN RATA - RATA
TOKO INDAH LIMA JAYA LIMA SATU RATA2 RATA2/KM /UNIT TOTAL
(Rp.) (Rp.) (Rp.) (KM) (Rp.) (Rp/Km) (Rp)
A B C D E F G H I J= H X I K=G + J L

KAYU
1 Papan 3/20-4 kls III bowplank Btg 90,000.00 70,000.00 85,000.00 82,000.00 12.00 1,000.00 12,000.00 94,000.00 94,000.00
2 Kayu 5/7-4 kls III stelan Btg 42,000.00 39,000.00 37,500.00 40,000.00 12.00 1,000.00 12,000.00 52,000.00 52,000.00
3 Kayu Kuda2 6/12 klas II Btg 270,000.00 200,000.00 235,000.00 12.00 1,000.00 12,000.00 247,000.00 247,000.00
4 Papan jepit 4/12 lbr 67,500.00 50,000.00 59,000.00 12.00 1,000.00 12,000.00 71,000.00 71,000.00
5 Balok kayu 5/10 klas II Btg 70,000.00 65,000.00 90,000.00 75,000.00 12.00 1,000.00 12,000.00 87,000.00 87,000.00
6 Papan klas II 3/25/4 (listplank) Lbr 125,000.00 85,000.00 105,000.00 12.00 1,000.00 12,000.00 117,000.00 117,000.00
7 Usuk kayu 4/6 klas II (r. Plafond) Btg 40,000.00 35,000.00 40,000.00 38,000.00 12.00 1,000.00 12,000.00 50,000.00 50,000.00
8 List plafond kayu profil Lbr 40,000.00 37,500.00 37,500.00 38,000.00 12.00 500.00 6,000.00 44,000.00 44,000.00
HARGA HARGA HARGA JARAK HARGA ONGKOS JUMLAH JUMLAH
DI DI DI ANGKUT ANGKUT ANGKUT HARGA HARGA
NO MATERIAL SATUAN RATA - RATA
RATA2 RATA2/KM /UNIT TOTAL
(Rp.) (Rp.) (Rp.) (KM) (Rp.) (Rp/Km) (Rp)
A B C D E F G H I J=HXI K=G+J L

BATA
1 Batako Bh - 2.00 100.00 200.00 200.00 0.00
2 Batu merah Bh 650.00 700.00 700.00 650.00 2.00 100.00 200.00 850.00 850.00

HARGA HARGA HARGA JARAK HARGA ONGKOS JUMLAH JUMLAH


DI DI DI ANGKUT ANGKUT ANGKUT HARGA HARGA
NO MATERIAL SATUAN RATA - RATA
Loli Marius Ama Leyn Simon Kopon RATA2 RATA2/KM /UNIT TOTAL
(Rp.) (Rp.) (Rp.) (KM) (Rp.) (Rp/Km) (Rp)
A B C D E F G H I J=HXI K=G+J L

PINTU JENDELA + BOVEN


1 Daun Pintu (P1) bh 1,400,000.00 1,200,000.00 1,300,000.00 1,300,000.00 12.00 2,000.00 20,000.00 1,320,000.00 1,320,000.00
2 Daun Pintu (P2) bh 700,000.00 700,000.00 700,000.00 12.00 2,000.00 20,000.00 720,000.00 720,000.00
3 Daun Jendela (J1) bh 375,000.00 350,000.00 400,000.00 375,000.00 12.00 2,000.00 20,000.00 395,000.00 395,000.00
4 Daun Jendela (J2) bh 325,000.00 350,000.00 400,000.00 358,000.00 12.00 2,000.00 20,000.00 378,000.00 378,000.00
5 Daun Bouven Pintu (P1) bh 150,000.00 180,000.00 80,000.00 137,000.00 12.00 2,000.00 20,000.00 157,000.00 157,000.00
6 Daun Bouven Pintu (P2) bh 150,000.00 180,000.00 80,000.00 137,000.00 12.00 2,000.00 20,000.00 157,000.00 157,000.00
7 Daun Bouven Jendela (J1 + J2) bh 150,000.00 350,000.00 300,000.00 267,000.00 12.00 2,000.00 20,000.00 287,000.00 287,000.00
8 Ventilasi bh 400,000.00 200,000.00 300,000.00 12.00 2,000.00 20,000.00 320,000.00 320,000.00
9 Kisi - Kisi Type I bh 1,400,000.00 1,400,000.00 1,400,000.00 12.00 2,000.00 20,000.00 1,420,000.00 1,420,000.00
10 Kisi - Kisi Type II bh 900,000.00 970,000.00 970,000.00 12.00 2,000.00 20,000.00 990,000.00 990,000.00
11 Kisi - Kisi Type III bh 1,700,000.00 1,500,000.00 1,500,000.00 12.00 2,000.00 20,000.00 1,520,000.00 1,520,000.00
12 Kisi - Kisi Type IV bh 700,000.00 1,200,000.00 1,200,000.00 12.00 2,000.00 20,000.00 1,220,000.00 1,220,000.00
13 Kusen P1 + Bouvent Kayu Klas I lbg 1,000,000.00 600,000.00 800,000.00 12.00 2,000.00 20,000.00 820,000.00 820,000.00
14 Kusen P2 + Bouvent Kayu Klas I lbg 1,000,000.00 600,000.00 800,000.00 12.00 2,000.00 20,000.00 820,000.00 820,000.00
15 Kusen J1 + Bouvent Kayu Klas I lbg 1,000,000.00 435,000.00 718,000.00 12.00 2,000.00 20,000.00 738,000.00 738,000.00
16 Kusen J2 + Bouvent Kayu Klas I lbg 700,000.00 450,000.00 575,000.00 12.00 2,000.00 20,000.00 595,000.00 595,000.00
17 Kusen Bouvent KM/WC Kayu Klas I lbg 150,000.00 450,000.00 300,000.00 12.00 2,000.00 20,000.00 320,000.00 320,000.00
18 Meja Guru 1/2 Biro Unit 1,500,000.00 1,400,000.00 1,450,000.00 12.00 2,000.00 20,000.00 1,470,000.00 1,470,000.00
19 Kursi Guru Unit 250,000.00 250,000.00 250,000.00 12.00 2,000.00 20,000.00 270,000.00 270,000.00
20 Meja Murid Unit 800,000.00 600,000.00 400,000.00 600,000.00 12.00 2,000.00 20,000.00 620,000.00 620,000.00
21 Kursi Murid Unit 200,000.00 300,000.00 250,000.00 250,000.00 12.00 2,000.00 20,000.00 270,000.00 270,000.00
22 Papan Tulis whiteboard Unit 900,000.00 1,500,000.00 1,500,000.00 1,300,000.00 12.00 2,000.00 20,000.00 1,320,000.00 1,320,000.00
23 Lemari Buku /Rak Unit 1,000,000.00 1,100,000.00 1,000,000.00 1,033,000.00 12.00 2,000.00 20,000.00 1,053,000.00 1,053,000.00
24 Lemari Arsip Unit 600,000.00 1,000,000.00 800,000.00 12.00 2,000.00 20,000.00 820,000.00 820,000.00

HARGA HARGA HARGA JARAK HARGA ONGKOS JUMLAH JUMLAH


DI DI DI ANGKUT ANGKUT ANGKUT HARGA HARGA
NO MATERIAL SATUAN RATA - RATA
RATA2 RATA2/KM /UNIT TOTAL
AGUS SUMARNO (Rp.) (Rp.) (KM) (Rp.) (Rp/Km) (Rp)
A B C D E F G H I J=HXI K=G+J L

PERMAINAN LUAR ANAK


1 Ayunan biasa Bh 1,500,000.00 1,500,000.00 17.00 2,000.00 34,000.00 1,534,000.00 1,534,000.00
2 Peluncur 2 arah Bh 3,800,000.00 3,800,000.00 17.00 2,000.00 34,000.00 3,834,000.00 3,834,000.00
3 Bola Dunia Bh 2,500,000.00 2,500,000.00 17.00 2,000.00 34,000.00 2,534,000.00 2,534,000.00
4 Jungkitan Bh 1,500,000.00 1,500,000.00 17.00 2,000.00 34,000.00 1,534,000.00 1,534,000.00

HARGA HARGA HARGA JARAK HARGA ONGKOS JUMLAH JUMLAH


DI DI DI ANGKUT ANGKUT ANGKUT HARGA HARGA
NO MATERIAL SATUAN RATA - RATA
Joko Isamadi Bina Karya Mandiri Ria RATA2 RATA2/KM /UNIT TOTAL
(Rp.) (Rp.) (Rp.) (KM) (Rp.) (Rp/Km) (Rp)
A B C D E F G H I J=HXI K=G+J L

PERMAINAN DALAM ANAK


1 Balok Bangunan set 120,000.00 125,000.00 125,000.00 123,000.00 17.00 500.00 8,500.00 131,500.00 132,000.00
2 Kertas Lipat set 100,000.00 105,000.00 105,000.00 103,000.00 17.00 500.00 8,500.00 111,500.00 112,000.00
3 Kertas Warna set 100,000.00 110,000.00 105,000.00 105,000.00 17.00 500.00 8,500.00 113,500.00 114,000.00
4 Krayon set 110,000.00 110,000.00 110,000.00 110,000.00 17.00 500.00 8,500.00 118,500.00 119,000.00
5 Plastisin set 45,000.00 45,000.00 50,000.00 47,000.00 17.00 500.00 8,500.00 55,500.00 56,000.00
6 Nuansa Warna set 125,000.00 130,000.00 130,000.00 128,000.00 17.00 500.00 8,500.00 136,500.00 137,000.00
7 Timbangan Geometri set 75,000.00 150,000.00 90,000.00 105,000.00 17.00 500.00 8,500.00 113,500.00 114,000.00
8 Kartu Huruf set 50,000.00 135,000.00 55,000.00 80,000.00 17.00 500.00 8,500.00 88,500.00 89,000.00
9 Puzzel Angka set 125,000.00 160,000.00 135,000.00 140,000.00 17.00 500.00 8,500.00 148,500.00 149,000.00
10 Puzzel Huruf set 125,000.00 165,000.00 135,000.00 142,000.00 17.00 500.00 8,500.00 150,500.00 151,000.00
11 Manik - Manik set 50,000.00 140,000.00 160,000.00 117,000.00 17.00 500.00 8,500.00 125,500.00 126,000.00
12 Bongkar Pasang set 200,000.00 270,000.00 205,000.00 225,000.00 17.00 500.00 8,500.00 233,500.00 234,000.00
13 Renteng Dinding Nama Hari set 95,000.00 110,000.00 100,000.00 102,000.00 17.00 500.00 8,500.00 110,500.00 111,000.00
14 Renteng Dinding Nama Bulan set 100,000.00 115,000.00 110,000.00 108,000.00 17.00 500.00 8,500.00 116,500.00 117,000.00
15 Renteng Dinding 4 Sehat 5 Sempurna set 100,000.00 110,000.00 105,000.00 105,000.00 17.00 500.00 8,500.00 113,500.00 114,000.00
16 Renteng Dinding Cerita Anak Nakal set 105,000.00 110,000.00 105,000.00 107,000.00 17.00 500.00 8,500.00 115,500.00 116,000.00
17 Boneka Keluarga set 120,000.00 125,000.00 125,000.00 123,000.00 17.00 500.00 8,500.00 131,500.00 132,000.00
18 Boneka Binatang set 120,000.00 125,000.00 125,000.00 123,000.00 17.00 500.00 8,500.00 131,500.00 132,000.00
19 Rambu - Rambu Lalu Lintas set 85,000.00 100,000.00 95,000.00 93,000.00 17.00 500.00 8,500.00 101,500.00 102,000.00
20 Boling dan Bola set 100,000.00 110,000.00 105,000.00 105,000.00 17.00 500.00 8,500.00 113,500.00 114,000.00
21 Renteng Tatib Sekolah set 125,000.00 130,000.00 130,000.00 128,000.00 17.00 500.00 8,500.00 136,500.00 137,000.00
22 Dekak - Dekak Besar dari Kayu set 150,000.00 175,000.00 165,000.00 163,000.00 17.00 500.00 8,500.00 171,500.00 172,000.00
22 Alat Masak set 90,000.00 120,000.00 100,000.00 103,000.00 17.00 500.00 8,500.00 111,500.00 112,000.00

HARGA HARGA HARGA JARAK HARGA ONGKOS JUMLAH JUMLAH


DI DI DI ANGKUT ANGKUT ANGKUT HARGA HARGA
NO MATERIAL SATUAN RATA - RATA
Santana Hilar RATA2 RATA2/KM /UNIT TOTAL AKHIR
(Rp.) (Rp.) (Rp.) (KM) (Rp.) (Rp/Km) (Rp) (Rp)
A B C D E F G H I J=HXI K=G+J L

PASIR BATU
1 Pasir pasang M³ 200,000.00 200,000.00 200,000.00 15.00 3,000.00 45,000.00 245,000.00 245,000.00
2 Pasir urug M³ 180,000.00 185,000.00 180,000.00 15.00 3,000.00 45,000.00 225,000.00 225,000.00
3 Tanah urug M³ 160,000.00 170,000.00 160,000.00 15.00 3,000.00 45,000.00 205,000.00 205,000.00
4 Batu 15/20 M³ 220,000.00 230,000.00 220,000.00 15.00 3,000.00 45,000.00 265,000.00 265,000.00
5 Kerikil uk. 2/3 M³ 300,000.00 400,000.00 300,000.00 15.00 3,000.00 45,000.00 345,000.00 345,000.00
HARGA HARGA HARGA JARAK HARGA ONGKOS JUMLAH JUMLAH
DI DI DI ANGKUT ANGKUT ANGKUT HARGA HARGA
NO MATERIAL SATUAN RATA - RATA
TOKO INDAH LIMA JAYA Panca Tunggal RATA2 RATA2/KM /UNIT TOTAL AKHIR
(Rp.) (Rp.) (Rp.) (KM) (Rp.) (Rp/Km) (Rp) (Rp)
A B C D E F G H I J=HXI K=G+J L

NON LOKAL
1 Paku biasa 5 cm kg 17,500.00 15,000.00 15,000.00 15,000.00 12.00 100.00 1,200.00 16,200.00 16,000.00
2 Semen 40 kg zak 57,000.00 51,000.00 54,000.00 51,000.00 12.00 500.00 6,000.00 57,000.00 57,000.00
3 Besi polos D 12 mm SNI btg 115,000.00 110,000.00 110,000.00 110,000.00 12.00 500.00 6,000.00 116,000.00 116,000.00
4 Kawat beton kg 25,000.00 20,000.00 20,000.00 20,000.00 12.00 100.00 1,200.00 21,200.00 21,000.00
5 Besi polos D 6 mm SNI btg 30,000.00 30,000.00 32,500.00 30,000.00 12.00 500.00 6,000.00 36,000.00 36,000.00
6 Seng Gel. BJLS 0,30 lbr 70,000.00 65,000.00 70,000.00 65,000.00 12.00 200.00 2,400.00 67,400.00 67,000.00
7 Paku seng kg 25,000.00 20,000.00 25,000.00 20,000.00 12.00 30.00 360.00 20,360.00 20,000.00
8 Seng plat 0,30 m 25,000.00 15,000.00 20,000.00 15,000.00 12.00 30.00 360.00 15,360.00 15,000.00
9 Paku 12 (Paku Putih) kg 25,000.00 25,000.00 25,000.00 25,000.00 12.00 30.00 360.00 25,360.00 25,000.00
10 Paku 10 biasa kg 17,500.00 15,000.00 17,500.00 15,000.00 12.00 100.00 1,200.00 16,200.00 16,000.00
11 Plat Strip 4 - 60 cm bh 40,000.00 50,000.00 50,000.00 40,000.00 12.00 30.00 0.00 40,000.00 40,000.00
12 Plat Strip 4 - 20 cm bh 25,000.00 25,000.00 25,000.00 25,000.00 12.00 30.00 0.00 25,000.00 25,000.00
13 Beugel U bulat 3 - 60 cm bh 55,000.00 50,000.00 50,000.00 50,000.00 12.00 30.00 0.00 50,000.00 50,000.00
14 Mor Baut ø 3/8 - 12 cm bh 4,000.00 5,000.00 5,000.00 4,000.00 12.00 30.00 0.00 4,000.00 4,000.00
15 Mor Baut ø 3/8 - 25 cm bh 7,500.00 6,000.00 6,000.00 6,000.00 12.00 30.00 360.00 6,360.00 6,000.00
16 Ring/Cinci Baut bh 1,000.00 1,000.00 1,000.00 1,000.00 12.00 50.00 0.00 1,000.00 1,000.00
17 Paku 7 cm kg 17,500.00 15,000.00 17,500.00 15,000.00 12.00 30.00 0.00 15,000.00 15,000.00
18 Keramik 40x40 cm dos 75,000.00 65,000.00 75,000.00 65,000.00 12.00 100.00 1,200.00 66,200.00 66,000.00
19 Semen warna kg 15,000.00 7,000.00 10,000.00 7,000.00 12.00 100.00 1,200.00 8,200.00 8,000.00
20 Keramik 20x20 cm dos 75,000.00 65,000.00 75,000.00 65,000.00 12.00 100.00 1,200.00 66,200.00 66,000.00
21 Keramik lantai WC 20x20 cm dos 75,000.00 65,000.00 65,000.00 65,000.00 12.00 30.00 360.00 65,360.00 65,000.00
22 Plywood 3 mm lbr 60,000.00 58,000.00 58,000.00 58,000.00 12.00 30.00 0.00 58,000.00 58,000.00
23 Paku tripleks kg 30,000.00 20,000.00 20,000.00 20,000.00 12.00 30.00 0.00 20,000.00 20,000.00
24 Cat seng (biru laut) kg 85,000.00 85,000.00 85,000.00 85,000.00 12.00 100.00 1,200.00 86,200.00 86,000.00
25 Cat plafond (Putih) Ember 275,000.00 185,000.00 185,000.00 185,000.00 12.00 100.00 1,200.00 186,200.00 186,000.00
26 Cat dinding (kuning telur) Ember 275,000.00 185,000.00 185,000.00 185,000.00 12.00 100.00 1,200.00 186,200.00 186,000.00
27 Cat listplank (merah hati) kg 40,000.00 40,000.00 40,000.00 12.00 100.00 1,200.00 41,200.00 41,000.00
28 Neon (Philips) 40 Watt bh 80,000.00 80,000.00 80,000.00 12.00 100.00 1,200.00 81,200.00 81,000.00
29 Saklar Ganda bh 20,000.00 20,000.00 20,000.00 12.00 100.00 1,200.00 21,200.00 21,000.00
30 Saklar Tunggal bh 15,000.00 15,000.00 15,000.00 12.00 70.00 0.00 15,000.00 15,000.00
31 Stop Kontak bh 20,000.00 20,000.00 20,000.00 12.00 70.00 0.00 20,000.00 20,000.00
32 Pipa PVC Ø 4'' btg 170,000.00 170,000.00 275,000.00 170,000.00 12.00 70.00 0.00 170,000.00 170,000.00
33 Soket PVC 4'' 135° bh 25,000.00 20,000.00 20,000.00 12.00 70.00 0.00 20,000.00 20,000.00
34 Pipa PVC Ø 2'' btg 170,000.00 170,000.00 170,000.00 12.00 70.00 0.00 170,000.00 170,000.00
35 Soket PVC 2'' 135° bh 25,000.00 20,000.00 20,000.00 12.00 70.00 0.00 20,000.00 20,000.00
36 Lem Paralon bh 10,000.00 10,000.00 10,000.00 10,000.00 12.00 70.00 0.00 10,000.00 10,000.00
37 Socket PVC Ø 4" bh 45,000.00 50,000.00 50,000.00 45,000.00 12.00 70.00 0.00 45,000.00 45,000.00
38 Socket PVC Ø 2" bh 45,000.00 50,000.00 50,000.00 45,000.00 12.00 100.00 1,200.00 46,200.00 46,000.00
39 Kloset Jongkok bh 175,000.00 150,000.00 150,000.00 12.00 100.00 0.00 150,000.00 150,000.00
40 Bak Penampung 2200 Ltr bh 3,500,000.00 3,850,000.00 3,500,000.00 12.00 30.00 0.00 3,500,000.00 3,500,000.00
41 Fool drain bh 50,000.00 50,000.00 50,000.00 50,000.00 12.00 30.00 50,000.00 50,000.00
42 Benang Nilon roll 10,000.00 10,000.00 10,000.00 10,000.00 12.00 30.00 10,000.00 10,000.00

HARGA HARGA HARGA JARAK HARGA ONGKOS JUMLAH JUMLAH


DI DI DI ANGKUT ANGKUT ANGKUT HARGA HARGA
NO MATERIAL SATUAN RATA - RATA
RATA2 RATA2/KM /UNIT TOTAL AKHIR
(Rp.) (Rp.) (Rp.) (KM) (Rp.) (Rp/Km) (Rp) (Rp)
A B C D E F G H I J=HXI K=G+J L

1 Air Kerja tanki 300,000.00 300,000.00 300,000.00


2 Papan Nama Proyek ls 150,000.00 150,000.00 150,000.00
3 Prasasti bh 850,000.00 850,000.00 850,000.00
HARGA HARGA HARGA JARAK HARGA ONGKOS JUMLAH JUMLAH
DI DI DI ANGKUT ANGKUT ANGKUT HARGA HARGA
NO MATERIAL SATUAN RATA - RATA
TOKO INDAH LIMA JAYA Panca Tunggal RATA2 RATA2/KM /UNIT TOTAL AKHIR
(Rp.) (Rp.) (Rp.) (KM) (Rp.) (Rp/Km) (Rp) (Rp)
A B C D E F G H I J=HXI K=G+J L

PERALATAN
1 Linggis bh 65,000.00 60,000 60,000 60,000.00 12.00 500.00 6,000.00 66,000.00 66,000.00
2 Cangkul bh 60,000.00 60,000 60,000 60,000.00 12.00 500.00 6,000.00 66,000.00 66,000.00
3 Sekop bh 65,000.00 85,000 50,000 50,000.00 12.00 500.00 6,000.00 56,000.00 56,000.00
4 Ember bh 10,000.00 10,000 15,000 10,000.00 12.00 100.00 1,200.00 11,200.00 11,000.00
5 Kuas biasa bh 15,000.00 15,000 15,000 15,000.00 12.00 - 0.00 15,000.00 15,000.00
6 Kuas roll bh 20,000.00 20,000.00 20,000.00 12.00 100.00 1,200.00 21,200.00 21,000.00

7 Kawat Ayak m' 25,000.00 25,000.00 25,000.00 25,000.00 12.00 30.00 0.00 25,000.00 25,000.00
8 Benang Nilon Roll 10,000.00 10,000.00 10,000.00 10,000.00 12.00 30.00 0.00 10,000.00 10,000.00
9 Terpal 4 x 6 bh 360,000.00 360,000.00 360,000.00 360,000.00 12.00 30.00 500.00 360,500.00 361,000.00

HARGA HARGA HARGA JARAK HARGA ONGKOS JUMLAH JUMLAH


DI DI DI ANGKUT ANGKUT ANGKUT HARGA HARGA
NO MATERIAL SATUAN RATA - RATA
CV. RATA2 RATA2/KM /UNIT TOTAL AKHIR
(Rp.) (Rp.) (Rp.) (KM) (Rp.) (Rp/Km) (Rp) (Rp)
A B C D E F G H I J=HXI K=G+J L

LISTRIK
1 Instalasi Listrik 900 watt ls 6,500,000.00 6,500,000.00 12.00 30.00 0.00 6,500,000.00 6,500,000.00
2 Neon (Philips) 40 Watt bh 80,000.00 80,000.00 80,000.00 12.00 30.00 0.00 80,000.00 80,000.00
3 Saklar Ganda bh 20,000.00 20,000.00 20,000.00 12.00 30.00 0.00 20,000.00 20,000.00
4 Saklar Tunggal bh 15,000.00 15,000.00 15,000.00 12.00 30.00 0.00 15,000.00 15,000.00
5 Stop Kontak bh 20,000.00 25,000.00 20,000.00 12.00 30.00 0.00 20,000.00 20,000.00
HARGA HARGA HARGA JARAK HARGA ONGKOS JUMLAH JUMLAH
DI DI DI ANGKUT ANGKUT ANGKUT HARGA HARGA
NO MATERIAL SATUAN RATA - RATA
RIA Joko Ismadi RATA2 RATA2/KM /UNIT TOTAL AKHIR
(Rp.) (Rp.) (Rp.) (KM) (Rp.) (Rp/Km) (Rp) (Rp)
A B C D E F G H I J=HXI K=G+J L

ALKES
1 Timbangan Bayi bh 975,000.00 900,000.00 900,000.00 12.00 30.00 0.00 900,000.00 900,000.00
2 Meter Pengukur Lila bh 100,000.00 100,000.00 100,000.00 12.00 30.00 0.00 100,000.00 100,000.00
3 Thermometer Digital bh 170,000.00 150,000.00 150,000.00 12.00 30.00 0.00 150,000.00 150,000.00
4 Timbangan Balita bh 725,000.00 650,000.00 650,000.00 12.00 30.00 0.00 650,000.00 650,000.00
5 Timbangan Dewasa dan Alat Ukur TB bh 3,250,000.00 3,000,000.00 3,000,000.00 12.00 30.00 0.00 3,000,000.00 3,000,000.00
6 Alat Tensi Spidometer bh 850,000.00 850,000.00 850,000.00 12.00 30.00 0.00 850,000.00 850,000.00
7 Ember Cuci tangan + Kran bh 800,000.00 800,000.00 12.00 30.00 0.00 800,000.00 800,000.00
8 Fundus Scop bh 2,000,000.00 2,000,000.00 2,000,000.00 12.00 30.00 0.00 2,000,000.00 2,000,000.00
9 Kain Gorden dan perlengkapan set 275,000.00 250,000.00 250,000.00 12.00 30.00 1.00 250,001.00 250,000.00
SURVEY HARGA SATUAN
PROPINSI : NUSA TENGGARA TIMUR T.A 2017
KABUPATEN : FLORES TIMUR
KECAMATAN : ILEBURA
DESA :
UPAH TENAGA
NO TENAGA KERJA KET.
KERJA (RP/HARI)
1 Tukang Rp -
2 Mandor Rp -
3 Pekerja Rp -

HARGA (On Site)


DI KETERANGAN
NO MATERIAL SPESIFIKASI SATUAN
..................................................

( Merk, Kubikasi atau Spesifikasi


(Rp.)
yang Lain )

A B C D E F
KAYU
1 Papan 3/20 kls III bowplank Panjang 4 m' Lbr
2 Papan Cor 3/25-4 Panjang 4 m' Lbr
3 Kayu 5/7-4 kls III stelan Panjang 4 m' Btg
4 Kayu/Balok 6/12
Klas I Panjang 4 m' (Bayam) Btg
Klas II Panjang 4 m' (Meranti, Ampupu, Sureng) Btg
5 Papan Gapit Kuda-Kuda (tebal : 3 cm x Lebar : 12 cm)
Klas I Panjang 4 m' (Bayam) Lbr
Klas II Panjang 4 m' (Meranti, Ampupu, Sureng) Lbr
6 Balok kayu 5/10 klas II
Klas I Panjang 4 m' (Bayam) Btg
Klas II Panjang 4 m' (Meranti, Ampupu, Sureng) Btg
7 Papan Listplank
Klas I Panjang 4 m' Lbr
Klas II Panjang 4 m' Lbr
Gipsum/Press Panjang 4 m' Lbr

8 Usuk 4/6
Klas I Panjang 4 m' (Bayam) Btg
Klas II Panjang 4 m' (Meranti, Ampupu, Sureng) Btg

9 List plafond kayu profil


Klas I Panjang 4 m' (Bayam) Lbr
Klas II Panjang 4 m' (Meranti, Ampupu, Sureng) Lbr
Gipsum/Press Panjang 4 m' Lbr

BATU, PASIR
ukuran 10 x 40 x 20 cm, sisi tajam, keras, tidak
1 Batako pecah Bh
ukuran 5 x 10 x 22 cm, sisi tajam, keras, warna
2 Batu merah Bh
merata
3 Pasir pasang Pasir Kali, Psr Gunung bukan Pasir Laut Reit/M³
4 Pasir urug Pasir Kali, Psr Gunung bukan Pasir Laut Reit/M³
5 Tanah urug Tidak mengandung kotoran plastik, dll Reit/M³
6 Batu Pasang (Batu Belah, Batu Kali, Batu Gunung) Ukuran 15/20 Cm Reit/M³
7 Kerikil uk. 2/3 Batu belah, 3 bidang pecah, keras Reit/M³

PINTU JENDELA + BOVEN


1 Daun Pintu (P1) Lebar 85 cm
Rangka & Panil Kayu Jati Lokal Lbr
Rangka & Panil Kayu Sureng Lbr
2 Daun Pintu (P2) Lebar 75 cm
Rangka & Panil Kayu Jati Lokal Lbr
Rangka & Panil Kayu Sureng Lbr
3 Daun Jendela (J1) Lebar 60 cm
Rangka & Panil Kayu Jati Lokal Lbr
Rangka & Panil Kayu Sureng Lbr
4 Daun Jendela (J2) Lebar 50 cm
Rangka & Panil Kayu Jati Lokal Lbr
Rangka & Panil Kayu Sureng Lbr
5 Bouven
Batu Rosrter bh
Kusen Kayu Klas I bh
6 Daun Bouven bh
Rangka & Panil Kayu Jati Lokal bh
Rangka & Panil Kayu Sureng
7 Kusen + Bouvent
Klas I 5/10 Panjang 4 m' (Bayam) Lubang
Klas II 5/10 Panjang 4 m' (Meranti, Ampupu, Sureng) Lubang
8 Kusen Jendela
Klas I 5/10 Panjang 4 m' (Bayam) Lubang
Klas II 5/10 Panjang 4 m' (Meranti, Ampupu, Sureng) Lubang
9 Meja 1/2 Biro
Jati Lokal Ukr. Tinggi 0,75 m Unit
Sureng Panjang 1,25 m Unit
Lebar 0,60 m
Rangka kayu kls I 4/5, penutup Papan Jati
Rangka kayu Jati 4/5, penutup Daun Papan Jati
10 Kursi Kantor
Jati Lokal ukr. Tinggi 0,85 m Unit
Suren tinggi duduk 0,40 m Unit
lebar depan 0,40 m , Lebar samping 0.45 m
Rangka kayu kls I / Jati , penutup Papan Jati

11 Meja Biasa
Jati Lokal ukr. Tinggi 0,75 m Unit
Suren panjang 1,25 m Unit
lebar 0,60 m
Rangka kayu kls I 4/5, penutup triplek / Daun Papan Jati
Rangka kayu Jati 4/5, penutup triplek / Daun Papan Jati
12 Lemari Arsip
Jati Lokal ukr. Pjg 1,20, lbr 0,40 tinggi 1,50 m Unit
Suren Rak atas kaca dorong 3 mm Unit
* Rangka kayu kls I Bayam 4/5, penutup triplek 2,8 mm,
2 daun pintu Jati
* Rangka kayu Jati 4/5, penutup triplek 2,8 mm, 2 daun
pintu Jati
* Rangka kayu Sureng 4/5, penutup triplek 2,8 mm, 2
daun pintu Mahoni

TOKO / FABRIKASI

1 Semen 40 kg
Bosowa Zak
Tonasa Zak
Gresik Zak
2 Besi polos Ø 12 mm Asli ( SNI ) Lonjor
3 Besi polos Ø 10 mm Asli ( SNI ) Lonjor
4 Besi polos Ø 8 mm Asli ( SNI ) Lonjor
5 Besi polos Ø 6 mm Asli ( SNI ) Lonjor
6 Kawat beton Kg
7 Seng Gel. BJLS 0,30
Warna Biru, Merah Hati Ayam Lbr
Polos Lbr
8 Paku seng Kg
9 Seng plat 0,30 m
10 Paku 16 Kg
11 Paku 12 (Paku Putih) Kg
12 Paku 12 (Biasa) Kg
13 Paku 10 biasa Kg
14 Paku 7 biasa Kg
15 Paku 5 biasa Kg
16 Plat Strip Tebal 4 mm - Pjg 60 cm Bh
17 Plat Strip Tebal 4 mm - Pjg 40 cm Bh
18 Plat Strip Tebal 4 mm - Pjg 20 cm Bh
18 Beugel U bulat 3 - 60 cm Bh
19 Mor Baut ø 12 mm - Panjang 16 cm Bh
20 Mor Baut ø 12 mm - Panjang 30 cm Bh
21 Baut Angkur ø 14 mm - Pjg 25 cm Bh
22 Ring/Cincin Baut Bh
23 Engsel Pintu Merk Hona Bh
Merk Cobra Bh
Merk ................................. Bh
24 Engsel Jendela Merk Hona Bh
Merk Cobra Bh
Merk ................................... Bh
25 Grendel Pintu Merk Medico Bh
Merk MDC 2" Bh
Merk ................................. Bh

26 Grendel Jendela Merk Medico Bh


Merk MDC 2" Bh
Merk .................................... Bh
27 Kait Angin Merk Sakura Bh
Merk RRC Bh
Merk ................................. Bh
28 Kunci Tanam Merk Royal Bh
Doubel Slag Merk TOP Bh
Merk ................................. Bh
29 Keramik 40x40 cm Dos
30 Keramik 30x30 cm Dos
31 Keramik 20x20 cm Dos
32 Keramik lantai WC 20x20 cm Motif, Kasar Dos
33 Semen warna Kg
34 Plywood 3 mm Lbr
35 Plywood 9 mm Lbr
36 Paku tripleks Kg
37 Cat seng (biru laut)
5 ( Lima ) Mawar/Belmas/Jarum Kg
1 ( Satu ) Mawar/Belmas/Jarum Kg
38 Cat plafond
5 ( Lima ) Matex/Aries/............. Kg
20 ( Dua Puluh ) Matex/Aries/............. Kg

39 Cat dinding
5 ( Lima ) Matex/Aries/............. Kg
20 ( Dua Puluh ) Matex/Aries/............. Kg
40 Cat Kayu
5 ( Lima ) Emco/Avian/Dexro Lux Kg
1 ( Satu ) Emco/Avian/Dexro Lux Kg
41 Meni Kayu
Pedang Ltr
Pedang Ltr
42 Minyak Cat / Tinner Spesial Ltr
43 Dumpul Pedang Kg
44 Kapur Kg
45 Plamir Arco/Master Waber Kg
46 Plamir Arco/Master Waber Kg
47 Neon Spiral, Jari
Lampu Phillips 5 watt Philips Bh
Lampu Phillips 8 watt Philips Bh
Lampu Phillips 14 watt Philips Bh
Lampu Phillips 18 watt Philips Bh
Lampu Phillips 23 watt Philips Bh
48 Saklar Ganda Broco Bh
49 Saklar Tunggal Broco Bh
50 Stop Kontak Broco Bh
51 Embol Dos Broco Bh
52 Vitting Lampu Broco Bh
53 Pipa PVC Ø 4'' Maspion btg
54 Soket PVC 4'' 135° Maspion Bh
55 Pipa PVC Ø 2'' Maspion btg
56 Soket PVC 2'' 135° Maspion Bh
57 Lem Paralon Bh
58 Socket PVC Ø 4" Maspion Bh
59 Socket PVC Ø 2" Maspion Bh
60 Kloset Jongkok Bh
61 Profil Tank
2200 Ltr Bh
1100 Ltr Bh
62 Floor drain Bh

PERALATAN
1 Pick Well Bh
2 Cangkul Bh
3 Sekop Bh
4 Ember Cor Bh
5 Ember Air Sedang Anti Pecah
6 Kuas biasa
4" (10 cm) Medico Bh
3" (7cm) Medico Bh
2" (5 cm) Medico Bh
7 Senduk Plamir Besar Bh
Kecil Bh
8 Kuas roll Bh
7 Kawat Ayak m'
8 Benang Profil 2 mm Roll
9 Terpal 4 x 6 Bh
10 Gerobak Dorong Arco Unit
11 Drom Plastik 200 Ltr Bh

LAIN - LAIN

1 Air Kerja 5000 ltr tanki


2 Papan Nama Proyek Baliho + Rangka Kayu Ls
Triplex + Rangka Kayu Ls
3 Prasasti Keramik Bh
Pasangan Batu Ls

...................................., ......................................................... 2017


Catatan ;
1 Bahwa Harga Bahan/Material yang akan dikirim sudah termasuk Biaya angkut.
2 Mohon Ditandatangani, Cap Perusahaan

TOKO/CV/UD Disurvey Oleh ;

( _______________________________ ) ( ____________________________ )
ANALISA HARGA SATUAN S.N.I

NO. URAIAN KOEF SAT HARGA SAT matrial HARGA SAT upah JUMLAH matrial JUMLAH upah TOTAL harga

A B C D E F G=(CXE) H = (C X F ) I=(G+H)

I PEKERJAAN PERSIAPAN
ANALISA 001 1 m' Pagar Sementara dari Kayu tinggi 2 m 0.00 38,691.56 38,691.56
Bahan
Dolken Kayu Ø 8 - 10/400 cm 1.250 btg Rp - Rp -
Semen Portland 2.500 Kg Rp - Rp -
Pasir Beton 0.005 m3 Rp - Rp -
Koral Beton 0.009 m3 Rp - Rp -
Kaso 5 / 7 ( albasiah ) 0.072 m3 Rp - Rp -
Paku Biasa 2" - 5" 0.060 Kg Rp - Rp -
Residu 0.400 Lt Rp - Rp -
Tenaga
Tukang Kayu 0.200 Oh Rp 65,734.00 Rp 13,146.80
Perkerja 0.400 Oh Rp 55,798.00 Rp 22,319.20
Kepala Tukang 0.020 Oh Rp 75,671.00 Rp 1,513.42
Mandor 0.020 Oh Rp 85,607.00 Rp 1,712.14

ANALISA 002 1 m' Pagar Sementara dari Seng Gelombang tinggi 2 m 0.00 38,691.56 38,691.56
Bahan
Dolken Kayu Ø 8 - 10/400 cm 1.250 btg Rp - 0.00
Semen Portland 2.500 Kg Rp - 0.00
Pasir Beton 1.200 m3 Rp - 0.00
Koral Beton 0.009 m3 Rp - 0.00
Kaso 5 / 7 ( albasiah ) 0.072 m3 Rp - 0.00
Paku Biasa 2" - 5" 0.060 Kg Rp - 0.00
Meni Besi 0.450 Lt Rp - 0.00
Tenaga
Tukang Kayu 0.200 Oh Rp 65,734.00 Rp 13,146.80
Perkerja 0.400 Oh Rp 55,798.00 Rp 22,319.20
Kepala Tukang 0.020 Oh Rp 75,671.00 Rp 1,513.42
Mandor 0.020 Oh Rp 85,607.00 Rp 1,712.14

ANALISA 003 1 m' Pagar Sementara dari Kawat Duri tinggi 1.8 m 0.00 33,111.76 33,111.76
Bahan
Dolken Kayu Ø 8 - 10/400 cm 1.000 btg Rp - 0.00
Semen Portland 2.000 Kg Rp - 0.00
Kawat Duri 25.000 Kg Rp - 0.00
Pasir Beton 0.005 m3 Rp - 0.00
Koral Beton 0.009 m3 Rp - 0.00
Paku Biasa 2" - 5" 0.060 Kg Rp - 0.00
Tenaga
Tukang Kayu 0.200 Oh Rp 65,734.00 13,147
Perkerja 0.300 Oh Rp 55,798.00 16,739
Kepala Tukang 0.020 Oh Rp 75,671.00 1,513
Mandor 0.020 Oh Rp 85,607.00 1,712

ANALISA 004 1 m' Pek. Pengukuran kembali (site) & Pemasangan Bowplank 0.00 13,337.95 13,337.95
Bahan
Kayu Kaso 5 / 7 (borneo) 0.012 m3 Rp - 0.00
Paku Biasa 2" - 5" 0.020 Kg Rp - 0.00
Kayu Papan 3 / 20 borneo 0.007 m3 Rp - 0.00
Tenaga
Tukang Kayu 0.100 Oh Rp 65,734.00 6,573
Perkerja 0.100 Oh Rp 55,798.00 5,580
Kepala Tukang 0.010 Oh Rp 75,671.00 757
Mandor 0.005 Oh Rp 85,607.00 428

ANALISA 005 1 m² Pek. Kantor Direksi Keet , dengan lantai plesteran 0.00 0.00 0.00
Bahan
Dolken Kayu Ø 8 - 10/400 cm 1.250 btg Rp - 0.00
Kayu Balok Borneo 0.180 m3 Rp - 0.00
Paku 0.850 Kg Rp - 0.00
Besi Strip 1.100 Kg Rp - 0.00
Semen Portland 35.000 Kg Rp - 0.00
Pasir Pasang 0.150 m3 Rp - 0.00
Pasir Beton 0.100 m3 Rp - 0.00
Koral Beton 0.150 m3 Rp - 0.00
Bata merah kelas I 30.000 bh Rp - 0.00
Seng Plat 0.250 lbr Rp - 0.00
Jendela Nako 2.000 bh Rp - 0.00
Kaca Polos 0.080 m2 Rp - 0.00
Kunci Tanam 0.150 bh Rp - 0.00
Plywood 4 mm 0.060 lbr Rp - 0.00
Tenaga
Tukang Kayu 2.000 Oh Rp - -
Tukang Batu 1.000 Oh Rp - -
Perkerja 2.000 Oh Rp - -
Kepala Tukang 0.300 Oh Rp - -
Mandor 0.050 Oh Rp - -

ANALISA 006 1 m² Pembuatan Gudang Semen dan Alat - alat 0.00 0.00 0.00
Bahan
Dolken Kayu Ø 8 - 10/400 cm 1.700 btg Rp - 0.00
Kayu Balok Borneo 0.210 m3 Rp - 0.00
Paku 0.300 Kg Rp - 0.00
Semen Portland 10.500 Kg Rp - 0.00
Pasir Beton 0.030 m3 Rp - 0.00
Koral Beton 0.050 m3 Rp - 0.00
Seng Gelombang BJLS 32 1.500 lbr Rp - 0.00
Tenaga
Tukang Kayu 2.000 Oh Rp - -
Perkerja 1.000 Oh Rp - -
Kepala Tukang 0.200 Oh Rp - -
Mandor 0.050 Oh Rp - -

ANALISA 007 1 m² Pembuatan Rumah Jaga / Konstruksi Kayu 0.00 0.00 0.00
Bahan
Dolken Kayu Ø 8 - 10/400 cm 3.000 btg Rp - 0.00
Kayu Balok Borneo 0.276 m3 Rp - 0.00
Paku 0.700 Kg Rp - 0.00
Seng Gelombang BJLS 32 1.500 lbr Rp - 0.00
Tenaga
Tukang Kayu 1.500 Oh Rp - -
Perkerja 1.000 Oh Rp - -
Kepala Tukang 0.150 Oh Rp - -
Mandor 0.050 Oh Rp - -

ANALISA 008 Membersihkan Lapangan dan Perataan 0.00 5,500.00 5,500.00


Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Mandor 0.050 Oh 55,000.00 2,750

ANALISA 009 1 m² Pembuatan Bedeng Buruh 547,485.00 116,050.00 663,535.00


Bahan
Dolken Kayu Ø 8 - 10/400 cm 1.250 btg 8,800.00 11,000.00
Kayu Balok Borneo 0.186 m3 1,815,000.00 337,590.00
Paku 0.300 Kg 34,100.00 10,230.00
Semen Portland 18.000 Kg 1,100.00 19,800.00
Pasir Beton 0.030 m3 215,000.00 6,450.00
Koral Beton 0.050 m3 275,000.00 13,750.00
Seng Gelombang BJLS 32 1.500 lbr 60,500.00 90,750.00
Plywood 4 mm 1.350 lbr 42,900.00 57,915.00
Tenaga
Tukang Kayu 2.000 Oh 38,500.00 77,000
Perkerja 1.000 Oh 27,500.00 27,500
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.050 Oh 55,000.00 2,750

ANALISA 010 1 m² Pembuatan Bak Adukan ( 40 x 50 x 20 ) cm 2,331,670.00 79,750.00 2,411,420.00


Bahan
Kayu Terentang 0.186 m3 1,540,000.00 286,440.00
Paku 0.300 Kg 34,100.00 10,230.00
Kayu Kaso 5 / 7 (borneo) 1.000 btg 2,035,000.00 2,035,000.00
Tenaga
Tukang Kayu 2.000 Oh 38,500.00 77,000
Mandor 0.050 Oh 55,000.00 2,750

ANALISA 011 1 m² Pembuatan Stegger dari Bambu, ( 40 x 50 x 20 ) cm 17,600.00 116,050.00 133,650.00


Bahan
Bambu Ø 6 - 8 / 600 cm 1.000 btg 13,200.00 13,200.00
Tali Ijuk 0.250 Kg 17,600.00 4,400.00
Tenaga
Tukang Kayu 2.000 Oh 38,500.00 77,000
Perkerja 1.000 Oh 27,500.00 27,500
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.050 Oh 55,000.00 2,750

ANALISA 012 1 m² Pembuatan Jalan Sementara 55,280.00 30,250.00 85,530.00


Bahan
Batu Belah 5 / 20 0.150 m3 209,000.00 31,350.00
Batu Belah 5 / 7 0.090 m3 242,000.00 21,780.00
Pasir Pasang 0.010 m3 215,000.00 2,150.00
Tenaga
Perkerja 1.000 Oh 27,500.00 27,500
Mandor 0.050 Oh 55,000.00 2,750

ANALISA 013 1 m³ Bongkaran Beton Bertulang 0.00 201,657.50 201,657.50


Tenaga
Perkerja 6.667 Oh 27,500.00 183,343
Mandor 0.333 Oh 55,000.00 18,315

ANALISA 014 1 m³ Bongkaran Dinding Tembok Bata Merah 0.00 185,157.50 185,157.50
Tenaga
Perkerja 6.667 Oh 27,500.00 183,343
Mandor 0.033 Oh 55,000.00 1,815

II PEKERJAAN TANAH
ANALISA 015 1 m3 Pek. Galian Tanah Biasa Max Kedalaman 1 m' 0.00 13,200.00 13,200.00
Tenaga
Perkerja 0.400 Oh 27,500.00 11,000
Tukang Gali Oh 33,000.00 -
Kepala Tukang Oh 44,000.00 -
Mandor 0.040 Oh 55,000.00 2,200

ANALISA 016 1 m3 Pek. Galian Tanah Biasa Max Kedalaman 2 m' 0.00 17,297.50 17,297.50
Tenaga
Perkerja 0.525 Oh 27,500.00 14,438
Tukang Gali Oh 33,000.00 -
Kepala Tukang Oh 44,000.00 -
Mandor 0.052 Oh 55,000.00 2,860

ANALISA 017 1 m3 Pek. Galian Tanah Biasa Max Kedalaman 3 m' 0.00 #VALUE! #VALUE!
Tenaga
Perkerja 0.735 Oh 27,500.00 20,213
Tukang Gali - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.073 Oh 55,000.00 4,015

ANALISA 018 1 m3 Pek. Galian Tanah Keras Max Kedalaman 1 m' 0.00 #VALUE! #VALUE!
Tenaga
Perkerja 0.625 Oh 27,500.00 17,188
Tukang Gali - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.062 Oh 55,000.00 3,410

ANALISA 019 1 m3 Pek. Galian Tanah Cadas Max Kedalaman 1 m' 0.00 #VALUE! #VALUE!
Tenaga
Perkerja 1.250 Oh 27,500.00 34,375
Tukang Gali - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.125 Oh 55,000.00 6,875
ANALISA 020 1 m3 Pek. Galian Tanah Lumpur Max Kedalaman 1 m' 0.00 #VALUE! #VALUE!
Tenaga
Perkerja 0.823 Oh 27,500.00 22,633
Tukang Gali - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.083 Oh 55,000.00 4,565

ANALISA 021 1 m² Pek. Stripping 1 m 0.00 #VALUE! #VALUE!


Tenaga
Perkerja 0.050 Oh 27,500.00 1,375
Tukang Gali - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.005 Oh 55,000.00 275

ANALISA 022 1 m³ Pembuangan Tanah sejauh 150 m 0.00 #VALUE! #VALUE!


Tenaga
Perkerja 0.192 Oh 27,500.00 5,280
Tukang Gali - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.050 Oh 55,000.00 2,750

ANALISA 023 1 m3 Urugan Tanah Kembali 0.00 #VALUE! #VALUE!


Tenaga
Perkerja 0.192 Oh 27,500.00 5,280
Tukang Gali - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.019 Oh 55,000.00 1,045

ANALISA 024 1 m3 Pemadatan tanah 0.00 #VALUE! #VALUE!


Tenaga
Perkerja 0.500 Oh 27,500.00 13,750
Tukang Gali - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.050 Oh 55,000.00 2,750

ANALISA 025 1 m3 Pek. Urugan Pasir 105,600.00 #VALUE! #VALUE!


Bahan
Pasir Urug 1.200 m3 88,000.00 105,600.00
Tenaga
Perkerja 0.300 Oh 27,500.00 8,250
Tukang Gali - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.010 Oh 55,000.00 550

ANALISA 026 1 m3 Pemasangan Lapisan ijuk 19,800.00 #VALUE! #VALUE!


Bahan
Ijuk 1.200 m3 16,500.00 19,800.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Gali - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.015 Oh 55,000.00 825

III PEKERJAAN PONDASI


ANALISA 027 1 m' Pembuatan Tiang Pancang ( 35 x 35 ) cm, Beton Bertulang 1,231,009.50 44,275.00 1,275,284.50
Bahan
Pasir Urug Darat 0.016 m3 35,750.00 572.00
Pasir Beton 0.080 m3 215,000.00 17,200.00
Koral Beton 0.125 m3 275,000.00 34,375.00
Semen Portland 49.000 Kg 1,100.00 53,900.00
Besi Beton 34.500 Kg 16,000.00 552,000.00
Kawat Beton 0.700 Kg 21,450.00 15,015.00
Kayu Kaso 5 / 7 (borneo) 0.270 m3 2,035,000.00 549,450.00
Paku 0.120 Kg 34,100.00 4,092.00
Minyak Bekisting 0.090 lt 4,950.00 445.50
Plamuur Tembok 0.200 Kg 19,800.00 3,960.00
Tenaga
Perkerja 0.800 Oh 27,500.00 22,000
Tukang Batu 0.500 Oh 35,750.00 17,875
Kepala Tukang 0.050 Oh 44,000.00 2,200
Mandor 0.040 Oh 55,000.00 2,200

ANALISA 028 1 m3 Pasangan Batu kali 1 Pc : 3Ps 710,460.00 69,465.00 779,925.00


Bahan
Batu Belah 15 / 20 1.100 m3 192,500.00 211,750.00
Semen Portland 392.000 Kg 1,100.00 431,200.00
Pasir Pasang 0.314 m3 215,000.00 67,510.00
Tenaga
Perkerja 1.500 Oh 27,500.00 41,250
Tukang Batu 0.600 Oh 35,750.00 21,450
Kepala Tukang 0.060 Oh 44,000.00 2,640
Mandor 0.075 Oh 55,000.00 4,125

ANALISA 029 1 m3 Pasangan Batu kali 1 Pc : 5Ps 478,310.00 69,465.00 547,775.00


Bahan
Batu Belah 15 / 20 1.100 m3 192,500.00 211,750.00
Semen Portland 136.000 Kg 1,100.00 149,600.00 3.4
Pasir Pasang 0.544 m3 215,000.00 116,960.00
Tenaga
Perkerja 1.500 Oh 27,500.00 41,250
Tukang Batu 0.600 Oh 35,750.00 21,450
Kepala Tukang 0.060 Oh 44,000.00 2,640
Mandor 0.075 Oh 55,000.00 4,125

IV PEKERJAAN DINDING
ANALISA 030 1 m2 Pasangan Bata Merah 1Pc : 3Ps 1 Bata 140,510.00 27,555.00 168,065.00
Bahan
Bata merah kelas I 140.000 bh 605.00 84,700.00
Semen Portland 32.950 Kg 1,100.00 36,245.00
Pasir Pasang 0.091 m3 215,000.00 19,565.00
Tenaga
Perkerja 0.650 Oh 27,500.00 17,875
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.030 Oh 55,000.00 1,650

ANALISA 031 1 m2 Pasangan Bata Merah 1Pc : 5Ps 1 Bata 131,050.00 27,555.00 158,605.00
Bahan
Bata merah kelas I 140.000 bh 605.00 84,700.00
Semen Portland 22.200 Kg 1,100.00 24,420.00
Pasir Pasang 0.102 m3 215,000.00 21,930.00
Tenaga
Perkerja 0.650 Oh 27,500.00 17,875
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.030 Oh 55,000.00 1,650

ANALISA 032 1 m2 Pasangan Bata Merah 1Pc : 3Ps 1/2 Bata 66,757.00 13,640.00 80,397.00
Bahan
Bata merah kelas I 70.000 bh 605.00 42,350.00
Semen Portland 14.370 Kg 1,100.00 15,807.00
Pasir Pasang 0.040 m3 215,000.00 8,600.00
Tenaga
Perkerja 0.320 Oh 27,500.00 8,800
Tukang Batu 0.100 Oh 35,750.00 3,575
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.015 Oh 55,000.00 825

ANALISA 033 1 m2 Pasangan Bata Merah 1Pc : 5Ps 1/2 Bata 62,673.00 13,640.00 76,313.00
Bahan
Bata merah kelas I 70.000 bh 605.00 42,350.00
Semen Portland 9.680 Kg 1,100.00 10,648.00 0.242
Pasir Pasang 0.045 m3 215,000.00 9,675.00
Tenaga
Perkerja 0.320 Oh 27,500.00 8,800
Tukang Batu 0.100 Oh 35,750.00 3,575
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.015 Oh 55,000.00 825

V PEKERJAAN PELESTERAN
ANALISA 032 1 m2 Plesteran Dinding 1Pc : 3Ps 11,213.00 12,072.50 23,285.50
Bahan
Semen Portland 6.480 Kg 1,100.00 7,128.00
Pasir Pasang 0.019 m3 215,000.00 4,085.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.010 Oh 55,000.00 550

ANALISA 033 1 m2 Plesteran Dinding 1Pc : 5Ps 9,482.00 12,072.50 21,554.50


Bahan
Semen Portland 4.320 Kg 1,100.00 4,752.00 0.108
Pasir Pasang 0.022 m3 215,000.00 4,730.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.010 Oh 55,000.00 550

ANALISA 034 1 m2 Plesteran Dinding 1Pc : 0. 5Kp : 3 Ps, tebal 15 mm 8,075.00 12,072.50 20,147.50
Bahan
Semen Portland 4.320 Kg 1,100.00 4,752.00
Kapur Padam 0.003 m3 176,000.00 528.00
Pasir Pasang 0.013 m3 215,000.00 2,795.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.010 Oh 55,000.00 550

ANALISA 035 1 m2 Plesteran Dinding 1Pc : 3Kp : 10Ps, tebal 15 mm 6,090.00 12,072.50 18,162.50
Bahan
Semen Portland 1.840 Kg 1,100.00 2,024.00
Kapur Padam 0.006 m3 176,000.00 1,056.00
Pasir Pasang 0.014 m3 215,000.00 3,010.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.010 Oh 55,000.00 550

ANALISA 036 1 m2 Plesteran 0.5Pc : 1Kp : 4Ps, tebal 15 mm 8,265.00 12,072.50 20,337.50
Bahan
Semen Portland 3.000 Kg 1,100.00 3,300.00
Kapur Padam 0.005 m3 176,000.00 880.00
Pasir Pasang 0.019 m3 215,000.00 4,085.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.010 Oh 55,000.00 550

ANALISA 037 1 m2 Plesteran 1Kp : 1 Sm : 1Ps, tebal 15 mm 3,529.89 12,072.50 15,602.39


Bahan
Semen Merah 0.009 Kg 1,210.00 10.89
Kapur Padam 0.009 m3 176,000.00 1,584.00
Pasir Pasang 0.009 m3 215,000.00 1,935.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.010 Oh 55,000.00 550

ANALISA 038 1 m2 Plesteran 1Kp : 1 Sm : 2Ps, tebal 15 mm 4,465.47 12,072.50 16,537.97


Bahan
Semen Merah 0.007 Kg 1,210.00 8.47
Kapur Padam 0.007 m3 176,000.00 1,232.00
Pasir Pasang 0.015 m3 215,000.00 3,225.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.010 Oh 55,000.00 550

ANALISA 039 1 m2 Plesteran 1Pc : 2 Ps, tebal 20 mm 20,653.00 15,592.50 36,245.50


Bahan
Semen Portland 14.280 Kg 1,100.00 15,708.00
Pasir Pasang 0.023 m3 215,000.00 4,945.00
Tenaga
Perkerja 0.250 Oh 27,500.00 6,875
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.0125 Oh 55,000.00 688

ANALISA 040 1 m2 Plesteran 1Pc : 3 Ps, tebal 20 mm 17,470.00 15,592.50 33,062.50


Bahan
Semen Portland 10.800 Kg 1,100.00 11,880.00
Pasir Pasang 0.026 m3 215,000.00 5,590.00
Tenaga
Perkerja 0.250 Oh 27,500.00 6,875
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.0125 Oh 55,000.00 688

ANALISA 041 1 m2 Plesteran 1Pc : 4Ps, tebal 20 mm 15,568.00 15,592.50 31,160.50


Bahan
Semen Portland 8.680 Kg 1,100.00 9,548.00
Pasir Pasang 0.028 m3 215,000.00 6,020.00
Tenaga
Perkerja 0.250 Oh 27,500.00 6,875
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.0125 Oh 55,000.00 688

ANALISA 042 1 m2 Plesteran 1Pc : 5Ps, tebal 20 mm 14,039.00 15,592.50 29,631.50


Bahan
7.29 Semen Portland 7.290 Kg 1,100.00 8,019.00
Pasir Pasang 0.028 m3 215,000.00 6,020.00
Tenaga
Perkerja 0.250 Oh 27,500.00 6,875
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.0125 Oh 55,000.00 688

ANALISA 043 1 m2 Plesteran 1Pc : 6Ps, tebal 20 mm 13,314.00 15,592.50 28,906.50


Bahan
Semen Portland 6.240 Kg 1,100.00 6,864.00
Pasir Pasang 0.030 m3 215,000.00 6,450.00
Tenaga
Perkerja 0.250 Oh 27,500.00 6,875
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.0125 Oh 55,000.00 688

ANALISA 044 1 m2 Plesteran 1Kp : 1 Sm : 2Ps, tebal 15 mm 5,464.89 15,592.50 21,057.39


Bahan
Semen Merah 0.009 Kg 1,210.00 10.89
Kapur Padam 0.009 m3 176,000.00 1,584.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Tenaga
Perkerja 0.250 Oh 27,500.00 6,875
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.0125 Oh 55,000.00 688

ANALISA 045 1 m2 Plesteran 1Pc : 2Ps, tebal 25 mm 19,845.00 16,995.00 36,840.00


Bahan
Semen Portland 15.500 Kg 1,100.00 17,050.00
Pasir Pasang 0.013 m3 215,000.00 2,795.00
Tenaga
Perkerja 0.300 Oh 27,500.00 8,250
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.013 Oh 55,000.00 715

ANALISA 046 1 m2 Plesteran 1Pc : 3Ps, tebal 25 mm 20,450.00 16,995.00 37,445.00


Bahan
Semen Portland 11.750 Kg 1,100.00 12,925.00
Pasir Pasang 0.035 m3 215,000.00 7,525.00
Tenaga
Perkerja 0.300 Oh 27,500.00 8,250
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.013 Oh 55,000.00 715

ANALISA 047 1 m2 Plesteran 1Pc : 4Ps, tebal 25 mm 18,598.00 16,995.00 35,593.00


Bahan
Semen Portland 9.480 Kg 1,100.00 10,428.00
Pasir Pasang 0.038 m3 215,000.00 8,170.00
Tenaga
Perkerja 0.300 Oh 27,500.00 8,250
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.013 Oh 55,000.00 715

ANALISA 048 1 m2 Plesteran 1Pc : 5Ps, tebal 25 mm 17,119.00 16,995.00 34,114.00


Bahan
Semen Portland 7.940 Kg 1,100.00 8,734.00
Pasir Pasang 0.039 m3 215,000.00 8,385.00
Tenaga
Perkerja 0.300 Oh 27,500.00 8,250
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.013 Oh 55,000.00 715

ANALISA 049 1 m2 Plesteran 1Pc : 2Ps, tebal 30 mm 28,040.00 19,662.50 47,702.50


Bahan
Semen Portland 18.650 Kg 1,100.00 20,515.00
Pasir Pasang 0.035 m3 215,000.00 7,525.00
Tenaga
Perkerja 0.320 Oh 27,500.00 8,800
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.015 Oh 55,000.00 825

ANALISA 050 1 m2 Plesteran 1Pc : 3Ps, tebal 30 mm 23,950.00 19,662.50 43,612.50


Bahan
Semen Portland 14.150 Kg 1,100.00 15,565.00
Pasir Pasang 0.039 m3 215,000.00 8,385.00
Tenaga
Perkerja 0.320 Oh 27,500.00 8,800
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.015 Oh 55,000.00 825

ANALISA 051 1 m2 Plesteran 1Pc : 4Ps, tebal 30 mm 21,548.00 19,662.50 41,210.50


Bahan
Semen Portland 11.380 Kg 1,100.00 12,518.00
Pasir Pasang 0.042 m3 215,000.00 9,030.00
Tenaga
Perkerja 0.320 Oh 27,500.00 8,800
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.015 Oh 55,000.00 825

ANALISA 052 1 m2 Plesteran 1Pc : 5Ps, tebal 30 mm 18,684.00 19,662.50 38,346.50


Bahan
Semen Portland 8.190 Kg 1,100.00 9,009.00
Pasir Pasang 0.045 m3 215,000.00 9,675.00
Tenaga
Perkerja 0.320 Oh 27,500.00 8,800
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.015 Oh 55,000.00 825

ANALISA 053 1 m2 Berapen 1Pc : 3Ps, tebal 30 mm 12,292.00 7,375.50 19,667.50


Bahan
Semen Portland 7.070 Kg 1,100.00 7,777.00
Pasir Pasang 0.021 m3 215,000.00 4,515.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Batu 0.070 Oh 35,750.00 2,503
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.008 Oh 55,000.00 440

ANALISA 054 1 m2 Berapen 1Pc : 5Ps, tebal 15 mm 11,182.00 7,375.50 18,557.50


Bahan
Semen Portland 5.670 Kg 1,100.00 6,237.00
Pasir Pasang 0.023 m3 215,000.00 4,945.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Batu 0.070 Oh 35,750.00 2,503
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.008 Oh 55,000.00 440

ANALISA 055 1 m2 Pelesteran Beton 1Pc : 2Ps, tebal 15 mm 14,100.00 15,895.00 29,995.00
Bahan
Semen Portland 9.300 Kg 1,100.00 10,230.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Tenaga
Perkerja 0.260 Oh 27,500.00 7,150
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.013 Oh 55,000.00 715

ANALISA 056 1 m2 Pelesteran Beton 1Pc : 3Ps, tebal 15 mm 12,292.00 15,895.00 28,187.00
Bahan
Semen Portland 7.070 Kg 1,100.00 7,777.00
Pasir Pasang 0.021 m3 215,000.00 4,515.00
Tenaga
Perkerja 0.260 Oh 27,500.00 7,150
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.013 Oh 55,000.00 715

ANALISA 057 1 m2 Pelesteran Skoring 1Pc : 2Ps 980.00 4,708.00 5,688.00


Bahan
Semen Portland 0.500 Kg 1,100.00 550.00
Pasir Pasang 0.002 m3 215,000.00 430.00
Tenaga
Perkerja 0.057 Oh 27,500.00 1,568
Tukang Batu 0.038 Oh 35,750.00 1,359
Kepala Tukang 0.038 Oh 44,000.00 1,672
Mandor 0.002 Oh 55,000.00 110

ANALISA 058 1 m2 Pelesteran Granito 1Pc Warna : 2 Granito, tebal 10 mm 330,190.08 2,453.00 332,643.08
Bahan
PC Warna 0.144 Kg 1,320.00 190.08
Batu Granito 15.000 Kg 22,000.00 330,000.00
Tenaga
Perkerja 0.050 Oh 27,500.00 1,375
Tukang Batu 0.020 Oh 35,750.00 715
Kepala Tukang 0.002 Oh 44,000.00 88
Mandor 0.005 Oh 55,000.00 275

ANALISA 059 1 m2 Pelesteran Teraso 1Pc Warna : 2 Batu Teraso, tebal 10 mm 202,980.80 21,780.00 224,760.80
Bahan
PC Warna 0.440 Kg 1,320.00 580.80
Batu Teraso 11.500 Kg 17,600.00 202,400.00
Tenaga
Perkerja 0.450 Oh 27,500.00 12,375
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.025 Oh 55,000.00 1,375

ANALISA 060 1 m2 Pelesteran Ciprat 1 Pc : 2 Ps 8,192.00 11,715.00 19,907.00


Bahan
Semen Portland 4.320 Kg 1,100.00 4,752.00
Pasir Pasang 0.016 m3 215,000.00 3,440.00
Tenaga
Perkerja 0.250 Oh 27,500.00 6,875
Tukang Batu 0.100 Oh 35,750.00 3,575
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.015 Oh 55,000.00 825

ANALISA 061 1 m2 Pelesteran Siar Adukan 1 Pc : 2 Ps 8,192.00 7,375.50 15,567.50


Bahan
Semen Portland 4.320 Kg 1,100.00 4,752.00
Pasir Pasang 0.016 m3 215,000.00 3,440.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Batu 0.070 Oh 35,750.00 2,503
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.008 Oh 55,000.00 440

ANALISA 062 1 m2 Pelesteran Waterfroof Batacote 3 lapis 59,260.00 17,105.00 76,365.00


Bahan
Semen Portland 0.500 Kg 1,100.00 550.00
Batacote 2.900 Kg 19,800.00 57,420.00
Pasir Pasang 0.006 m3 215,000.00 1,290.00
Tenaga
Perkerja 0.300 Oh 27,500.00 8,250
Tukang Batu 0.200 Oh 35,750.00 7,150
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.015 Oh 55,000.00 825

ANALISA 063 1 m2 Plesteran Dinding 1 : 3 + ACIAN 14,390.00 12,519.38 26,909.38


Bahan
Semen Portland 8.0000 kg 1,100.00 8,800.00
Pasir Pasang 0.0260 m3 215,000.00 5,590.00
Tenaga
Perkerja 0.2250 org 27,500.00 6,188 0.00
Tukang Batu 0.1525 org 35,750.00 5,452 0.00
Kepala Tukang 0.0100 org 44,000.00 440 0.00
Mandor 0.0080 org 55,000.00 440 0.00

1 m2 Plesteran Dinding 1 : 5 + ACIAN 11,960.00 12,519.38 24,479.38


Bahan
Semen Portland 5.4000 kg 1,100.00 5,940.00
Pasir Pasang 0.0280 m3 215,000.00 6,020.00
Tenaga
Perkerja 0.2250 org 27,500.00 6,188 0.00
Tukang Batu 0.1525 org 35,750.00 5,452 0.00
Kepala Tukang 0.0100 org 44,000.00 440 0.00
Mandor 0.0080 org 55,000.00 440 0.00

III PEKERJAAN KAYU


1m³ Pasang Kusen Pintu dan Jendela Kayu Jati 30,250,000.00 1,039,500.00 31,289,500.00
Bahan
Kayu Balok Jati 1.100 m3 27,500,000.00 30,250,000.00
Tenaga
Perkerja 6.000 Oh 27,500.00 165,000
Tukang Kayu 20.000 Oh 38,500.00 770,000
Kepala Tukang 2.000 Oh 44,000.00 88,000
Mandor 0.300 Oh 55,000.00 16,500

1m³ Pasang Kusen Pintu dan Jendela Kayu Borneo 2,178,000.00 962,500.00 3,140,500.00
Bahan
Kayu Balok Borneo 1.200 m3 1,815,000.00 2,178,000.00
Tenaga
Perkerja 6.000 Oh 27,500.00 165,000
Tukang Kayu 18.000 Oh 38,500.00 693,000
Kepala Tukang 2.000 Oh 44,000.00 88,000
Mandor 0.300 Oh 55,000.00 16,500

1m³ Pasang Kusen Pintu dan Jendela Kayu Damar Laut 2,442,000.00 962,500.00 3,404,500.00
Bahan
Kayu Balok Damar Laut 1.200 m3 2,035,000.00 2,442,000.00
Tenaga
Perkerja 6.000 Oh 27,500.00 165,000
Tukang Kayu 18.000 Oh 38,500.00 693,000
Kepala Tukang 2.000 Oh 44,000.00 88,000
Mandor 0.300 Oh 55,000.00 16,500

1m² Pasang Pintu Klamp Kayu Kamper 74,965.00 55,660.00 130,625.00


Bahan
Papan Kayu Kamper 0.036 m3 2,035,000.00 73,260.00
Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.350 Oh 27,500.00 9,625
Tukang Kayu 1.050 Oh 38,500.00 40,425
Kepala Tukang 0.105 Oh 44,000.00 4,620
Mandor 0.018 Oh 55,000.00 990

1m² Pasang Pintu Klamp Kayu Borneo 74,965.00 55,660.00 130,625.00


Bahan
Papan Kayu Borneo 0.036 m3 2,035,000.00 73,260.00
Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.350 Oh 27,500.00 9,625
Tukang Kayu 1.050 Oh 38,500.00 40,425
Kepala Tukang 0.105 Oh 44,000.00 4,620
Mandor 0.018 Oh 55,000.00 990

1m² Pasang Pintu Panel Kayu Jati 1,375,000.00 137,500.00 1,512,500.00


Bahan
Papan Kayu Jati 0.050 m3 27,500,000.00 1,375,000.00
Tenaga
Perkerja 1.000 Oh 27,500.00 27,500
Tukang Kayu 2.500 Oh 38,500.00 96,250
Kepala Tukang 0.250 Oh 44,000.00 11,000
Mandor 0.050 Oh 55,000.00 2,750

1m² Pasang Pintu Panel Kayu Kamper 81,400.00 137,500.00 218,900.00


Bahan
Papan Kayu Kamper 0.040 m3 2,035,000.00 81,400.00
Tenaga
Perkerja 1.000 Oh 27,500.00 27,500
Tukang Kayu 2.500 Oh 38,500.00 96,250
Kepala Tukang 0.250 Oh 44,000.00 11,000
Mandor 0.050 Oh 55,000.00 2,750

1m² Pasang Pintu dan Jendela Kaca Kayu Jati 962,500.00 110,000.00 1,072,500.00
Bahan
Papan Kayu Jati 0.035 m3 27,500,000.00 962,500.00
Tenaga
Perkerja 0.800 Oh 27,500.00 22,000
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.040 Oh 55,000.00 2,200

1m² Pasang Pintu dan Jendela Kaca Kayu Kamper 71,225.00 110,000.00 181,225.00
Bahan
Papan Kayu Kamper 0.035 m3 2,035,000.00 71,225.00
Tenaga
Perkerja 0.800 Oh 27,500.00 22,000
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.040 Oh 55,000.00 2,200

1m² Pasang Pintu dan Jendela Kaca Kayu Borneo 71,225.00 110,000.00 181,225.00
Bahan
Papan Kayu Borneo 0.035 m3 2,035,000.00 71,225.00
Tenaga
Perkerja 0.800 Oh 27,500.00 22,000
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.040 Oh 55,000.00 2,200

1m² Pasang Pintu dan Jendela Jalusi Kayu Borneo 130,240.00 172,700.00 302,940.00
Bahan
Papan Kayu Borneo 0.064 m3 2,035,000.00 130,240.00
Tenaga
Perkerja 1.000 Oh 27,500.00 27,500
Tukang Kayu 3.000 Oh 38,500.00 115,500
Kepala Tukang 0.300 Oh 44,000.00 13,200
Mandor 0.300 Oh 55,000.00 16,500

1m² Pasang Pintu dan Jendela Jalusi Kayu Kamper 130,240.00 183,700.00 313,940.00
Bahan
Papan Kayu Borneo 0.064 m3 2,035,000.00 130,240.00
Tenaga
Perkerja 1.000 Oh 27,500.00 27,500
Tukang Kayu 3.000 Oh 38,500.00 115,500
Kepala Tukang 0.300 Oh 44,000.00 13,200
Mandor 0.500 Oh 55,000.00 27,500

1m² Pasang Pintu Plywood rangkap, rangka kayu Jati 585,893.00 103,950.00 689,843.00
Bahan
Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00
Paku Biasa ½" - 1" 0.030 Kg 34,100.00 1,023.00
Lem Kayu 0.300 Lt 9,900.00 2,970.00
Plywood 4 mm 1.000 Lbr 42,900.00 42,900.00
Tenaga
Perkerja 0.600 Oh 27,500.00 16,500
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.030 Oh 55,000.00 1,650

1m² Pasang Pintu Plywood rangkap, rangka kayu Kamper 585,893.00 103,950.00 689,843.00
Bahan
Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00
Paku Biasa ½" - 1" 0.030 Kg 34,100.00 1,023.00
Lem Kayu 0.300 Lt 9,900.00 2,970.00
Plywood 4 mm 1.000 Lbr 42,900.00 42,900.00
Tenaga
Perkerja 0.600 Oh 27,500.00 16,500
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.030 Oh 55,000.00 1,650

1m² Pasang Jalusi Mati Kusen Kayu Jati 1,655,115.00 100,925.00 1,756,040.00
Bahan
Papan Kayu Jati 0.0600 m3 27,500,000.00 1,650,000.00
Paku Biasa ½" - 1" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.500 Oh 27,500.00 13,750
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.025 Oh 55,000.00 1,375
1m² Pasang Jalusi Mati Kusen Kayu Kamper 1,655,115.00 100,925.00 1,756,040.00
Bahan
Papan Kayu Jati 0.0600 m3 27,500,000.00 1,650,000.00
Paku Biasa ½" - 1" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.500 Oh 27,500.00 13,750
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.025 Oh 55,000.00 1,375

1m² Pasang Pintu Plywood Rangkap, rangka Kayu Borneo 86,779.00 103,950.00 190,729.00
Bahan
Papan Kayu Borneo 0.0196 m3 2,035,000.00 39,886.00
Paku Biasa ½" - 1" 0.030 Kg 34,100.00 1,023.00
Lem Kayu 0.300 Lt 9,900.00 2,970.00
Plywood 4 mm 1.000 lbr 42,900.00 42,900.00
Tenaga
Perkerja 0.600 Oh 27,500.00 16,500
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.030 Oh 55,000.00 1,650

1m² Pasang Pintu Teakwood Rangkap, rangka Kayu Jati 595,100.00 103,950.00 699,050.00
Bahan
Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00
Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00
Lem Kayu 0.300 Lt 9,900.00 2,970.00
Plywood 4 mm 1.000 lbr 42,900.00 42,900.00
Tenaga
Perkerja 0.600 Oh 27,500.00 16,500
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.030 Oh 55,000.00 1,650

1m² Pasang Pintu Teakwood Rangkap, rangka Kayu Kamper 595,100.00 103,950.00 699,050.00
Bahan
Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00
Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00
Lem Kayu 0.300 Lt 9,900.00 2,970.00
Plywood 4 mm 1.000 lbr 42,900.00 42,900.00
Tenaga
Perkerja 0.600 Oh 27,500.00 16,500
Tukang Kayu 2.000 Oh 38,500.00 77,000
Kepala Tukang 0.200 Oh 44,000.00 8,800
Mandor 0.030 Oh 55,000.00 1,650

1m² Pasang Pintu Plywood & Formika, rangka Kayu Jati 633,050.00 131,450.00 764,500.00
Bahan
Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00
Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00
Lem Kayu 0.800 Lt 9,900.00 7,920.00
Plywood 4 mm 1.000 lbr 42,900.00 42,900.00
Formika 4' x 3' 0.500 lbr 66,000.00 33,000.00
Tenaga
Perkerja 0.800 Oh 27,500.00 22,000
Tukang Kayu 2.500 Oh 38,500.00 96,250
Kepala Tukang 0.250 Oh 44,000.00 11,000
Mandor 0.040 Oh 55,000.00 2,200

1m² Pasang Pintu Plywood & Formika, rangka Kayu Kamper 133,936.00 131,450.00 265,386.00
Bahan
Papan Kayu Kamper 0.0196 m3 2,035,000.00 39,886.00
Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00
Lem Kayu 0.800 Lt 9,900.00 7,920.00
Plywood 4 mm 1.000 lbr 42,900.00 42,900.00
Formika 4' x 3' 0.500 lbr 66,000.00 33,000.00
Tenaga
Perkerja 0.800 Oh 27,500.00 22,000
Tukang Kayu 2.500 Oh 38,500.00 96,250
Kepala Tukang 0.250 Oh 44,000.00 11,000
Mandor 0.040 Oh 55,000.00 2,200

1m² Pasang Pintu Teakwood & Formika, rangka Kayu Jati 633,050.00 131,450.00 764,500.00
Bahan
Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00
Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00
Lem Kayu 0.800 Lt 9,900.00 7,920.00
Plywood 4 mm 1.000 lbr 42,900.00 42,900.00
Formika 4' x 3' 0.500 lbr 66,000.00 33,000.00
Tenaga
Perkerja 0.800 Oh 27,500.00 22,000
Tukang Kayu 2.500 Oh 38,500.00 96,250
Kepala Tukang 0.250 Oh 44,000.00 11,000
Mandor 0.040 Oh 55,000.00 2,200

1m² Pasang Pintu Teakwood & Formika, rangka Kayu Kamper ( divernis ) 611,600.00 131,450.00 743,050.00
Bahan
Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00
Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00
Lem Kayu 0.800 Lt 9,900.00 7,920.00
Plywood 4 mm 0.500 lbr 42,900.00 21,450.00
Formika 4' x 3' 0.500 lbr 66,000.00 33,000.00
Tenaga
Perkerja 0.800 Oh 27,500.00 22,000
Tukang Kayu 2.500 Oh 38,500.00 96,250
Kepala Tukang 0.250 Oh 44,000.00 11,000
Mandor 0.040 Oh 55,000.00 2,200

1m² Pasang Pintu Formika Double, rangka Kayu Jati 670,010.00 141,790.00 811,800.00
Bahan
Papan Kayu Jati 0.0196 m3 27,500,000.00 539,000.00
Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00
Lem Kayu 1.200 Lt 9,900.00 11,880.00
Plywood 4 mm 1.000 lbr 42,900.00 42,900.00
Formika 4' x 3' 1.000 lbr 66,000.00 66,000.00
Tenaga
Perkerja 1.000 Oh 27,500.00 27,500
Tukang Kayu 2.600 Oh 38,500.00 100,100
Kepala Tukang 0.260 Oh 44,000.00 11,440
Mandor 0.050 Oh 55,000.00 2,750

1m² Pasang Pintu Formika Double, rangka Kayu Kamper 170,896.00 141,790.00 312,686.00
Bahan
Papan Kayu Kamper 0.0196 m3 2,035,000.00 39,886.00
Paku Biasa ½" - 1" 0.300 Kg 34,100.00 10,230.00
Lem Kayu 1.200 Lt 9,900.00 11,880.00
Plywood 4 mm 1.000 lbr 42,900.00 42,900.00
Formika 4' x 3' 1.000 lbr 66,000.00 66,000.00
Tenaga
Perkerja 1.000 Oh 27,500.00 27,500
Tukang Kayu 2.600 Oh 38,500.00 100,100
Kepala Tukang 0.260 Oh 44,000.00 11,440
Mandor 0.050 Oh 55,000.00 2,750

1m3 Pasang Konstruksi Kuda - kuda Kayu Jati 30,450,530.00 635,800.00 31,086,330.00
Bahan
Balok Kayu Jati 1.100 m3 27,500,000.00 30,250,000.00
Besi Strip 15.000 11,550.00 173,250.00
Paku Biasa 2" - 5" 0.800 Kg 34,100.00 27,280.00
Tenaga
Perkerja 4.000 Oh 27,500.00 110,000
Tukang Kayu 12.000 Oh 38,500.00 462,000
Kepala Tukang 1.200 Oh 44,000.00 52,800
Mandor 0.200 Oh 55,000.00 11,000

1m3 Pasang Konstruksi Kuda - kuda Kayu Kamper 2,015,530.00 635,800.00 2,651,330.00
Bahan
Balok Kayu Kamper 1.100 m3 1,650,000.00 1,815,000.00
Besi Strip 15.000 Kg 11,550.00 173,250.00
Paku Biasa 2" - 5" 0.800 Kg 34,100.00 27,280.00
Tenaga
Perkerja 4.000 Oh 27,500.00 110,000
Tukang Kayu 12.000 Oh 38,500.00 462,000
Kepala Tukang 1.200 Oh 44,000.00 52,800
Mandor 0.200 Oh 55,000.00 11,000

1m3 Pasang Konstruksi Kuda - kuda Kayu Borneo 1,960,530.00 635,800.00 2,596,330.00
Bahan
Balok Kayu Borneo 1.100 m3 1,600,000.00 1,760,000.00
Besi Strip 15.000 Kg 11,550.00 173,250.00
Paku Biasa 2" - 5" 0.800 Kg 34,100.00 27,280.00
Tenaga
Perkerja 4.000 Oh 27,500.00 110,000
Tukang Kayu 12.000 Oh 38,500.00 462,000
Kepala Tukang 1.200 Oh 44,000.00 52,800
Mandor 0.200 Oh 55,000.00 11,000

1m3 Pasang Konstruksi Kuda - kuda Kayu Kruing 1,834,030.00 635,800.00 2,469,830.00
Bahan
Balok Kayu Kruing 1.100 m3 1,485,000.00 1,633,500.00
Besi Strip 15.000 Kg 11,550.00 173,250.00
Paku Biasa 2" - 5" 0.800 Kg 34,100.00 27,280.00
Tenaga
Perkerja 4.000 Oh 27,500.00 110,000
Tukang Kayu 12.000 Oh 38,500.00 462,000
Kepala Tukang 1.200 Oh 44,000.00 52,800
Mandor 0.200 Oh 55,000.00 11,000

1m² Pasang Kaso + Reng Genteng Kodok Kayu Kamper 24,915.00 7,315.00 32,230.00
Bahan
Balok Kayu Kamper 0.012 m3 1,650,000.00 19,800.00
Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.005 Oh 55,000.00 275

1m² Pasang Kaso + Reng Genteng Kodok Kayu Borneo 24,315.00 7,315.00 31,630.00
Bahan
Balok Kayu Borneo 0.012 m3 1,600,000.00 19,200.00
Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.005 Oh 55,000.00 275

1m² Pasang Kaso + Reng Genteng Monier Kayu Jati 390,115.00 7,315.00 397,430.00
Bahan
Balok Kayu Jati 0.014 m3 27,500,000.00 385,000.00
Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.005 Oh 55,000.00 275

1m² Pasang Kaso + Reng Genteng Monier Kayu Kamper 28,215.00 7,315.00 35,530.00
Bahan
Balok Kayu Kamper 0.014 m3 1,650,000.00 23,100.00
Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.005 Oh 55,000.00 275
1m² Pasang Kaso + Reng Genteng Beton Kayu Borneo 27,515.00 7,315.00 34,830.00
Bahan
Balok Kayu Borneo 0.014 m3 1,600,000.00 22,400.00
Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.005 Oh 55,000.00 275

1m² Pasang Kaso + Reng Atap Sirap Kayu Kamper 279,070.00 8,778.00 287,848.00
Bahan
Balok Kayu Kamper 0.165 m3 1,650,000.00 272,250.00
Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00
Tenaga
Perkerja 0.120 Oh 27,500.00 3,300
Tukang Kayu 0.120 Oh 38,500.00 4,620
Kepala Tukang 0.012 Oh 44,000.00 528
Mandor 0.006 Oh 55,000.00 330

1m² Pasang Kaso + Reng Atap Sirap Kayu Borneo 279,070.00 8,778.00 287,848.00
Bahan
Balok Kayu Kamper 0.165 m3 1,650,000.00 272,250.00
Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00
Tenaga
Perkerja 0.120 Oh 27,500.00 3,300
Tukang Kayu 0.120 Oh 38,500.00 4,620
Kepala Tukang 0.012 Oh 44,000.00 528
Mandor 0.006 Oh 55,000.00 330

1m² Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Jati 333,410.00 18,975.00 352,385.00
Bahan
Balok Kayu Jati 0.012 m3 27,500,000.00 330,000.00
Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.250 Oh 38,500.00 9,625
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.075 Oh 55,000.00 4,125

1m' Pasang papan ruiter ( 3 x 20 )cm Kayu Borneo 16,357.00 11,825.00 28,182.00
Bahan
Kayu Papan 3 / 20 borneo 0.0072 m3 2,035,000.00 14,652.00
Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.200 Oh 38,500.00 7,700
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.005 Oh 55,000.00 275

1m² Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Kamper 23,210.00 18,975.00 42,185.00
Bahan
Balok Kayu Kamper 0.012 m3 1,650,000.00 19,800.00
Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.250 Oh 38,500.00 9,625
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.075 Oh 55,000.00 4,125

1m² Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Borneo 23,210.00 18,975.00 42,185.00
Bahan
Balok Kayu Kamper 0.012 m3 1,650,000.00 19,800.00
Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.250 Oh 38,500.00 9,625
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.075 Oh 55,000.00 4,125

1m² Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Jati 637,615.00 18,920.00 656,535.00
Bahan
Balok Kayu Jati 0.023 m3 27,500,000.00 632,500.00
Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Kayu 0.300 Oh 38,500.00 11,550
Kepala Tukang 0.030 Oh 44,000.00 1,320
Mandor 0.010 Oh 55,000.00 550

1m² Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Kamper 43,065.00 18,920.00 61,985.00
Bahan
Balok Kayu Kamper 0.023 m3 1,650,000.00 37,950.00
Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Kayu 0.300 Oh 38,500.00 11,550
Kepala Tukang 0.030 Oh 44,000.00 1,320
Mandor 0.010 Oh 55,000.00 550

1m² Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Borneo 41,915.00 18,920.00 60,835.00
Bahan
Balok Kayu Borneo 0.023 m3 1,600,000.00 36,800.00
Paku Biasa 2" - 5" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Kayu 0.300 Oh 38,500.00 11,550
Kepala Tukang 0.030 Oh 44,000.00 1,320
Mandor 0.010 Oh 55,000.00 550

1m² Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Jati 749,320.00 22,577.50 771,897.50
Bahan
Balok Kayu Jati 0.027 m3 27,500,000.00 742,500.00
Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00
Tenaga
Perkerja 0.250 Oh 27,500.00 6,875
Tukang Kayu 0.350 Oh 38,500.00 13,475
Kepala Tukang 0.035 Oh 44,000.00 1,540
Mandor 0.0125 Oh 55,000.00 688

1m² Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Kamper 51,370.00 22,577.50 73,947.50
Bahan
Balok Kayu Kamper 0.027 m3 1,650,000.00 44,550.00
Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00
Tenaga
Perkerja 0.250 Oh 27,500.00 6,875
Tukang Kayu 0.350 Oh 38,500.00 13,475
Kepala Tukang 0.035 Oh 44,000.00 1,540
Mandor 0.0125 Oh 55,000.00 688

1m² Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Borneo 50,020.00 22,577.50 72,597.50
Bahan
Balok Kayu Borneo 0.027 m3 1,600,000.00 43,200.00
Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00
Tenaga
Perkerja 0.250 Oh 27,500.00 6,875
Tukang Kayu 0.350 Oh 38,500.00 13,475
Kepala Tukang 0.035 Oh 44,000.00 1,540
Mandor 0.0125 Oh 55,000.00 688

1m' Pasang Lisplank ( 3 x 20 )cm Kayu Jati 199,705.00 11,825.00 211,530.00


Bahan
Papan Kayu Jati 0.0072 m3 27,500,000.00 198,000.00
Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.200 Oh 38,500.00 7,700
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.005 Oh 55,000.00 275

1m' Pasang Lisplank ( 3 x 20 )cm Kayu Kamper 16,357.00 11,825.00 28,182.00


Bahan
Papan Kayu Kamper 0.0072 m3 2,035,000.00 14,652.00
Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.200 Oh 38,500.00 7,700
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.005 Oh 55,000.00 275

1m' Pasang Lisplank ( 3 x 30 )cm Kayu Jati 304,205.00 12,738.00 316,943.00


Bahan
Papan Kayu Jati 0.0110 m3 27,500,000.00 302,500.00
Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.110 Oh 27,500.00 3,025
Tukang Kayu 0.220 Oh 38,500.00 8,470
Kepala Tukang 0.022 Oh 44,000.00 968
Mandor 0.005 Oh 55,000.00 275

1m' Pasang Lisplank ( 3 x 30 )cm Kayu Kamper 24,090.00 12,738.00 36,828.00


Bahan
Papan Kayu Kamper 0.0110 m3 2,035,000.00 22,385.00
Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.110 Oh 27,500.00 3,025
Tukang Kayu 0.220 Oh 38,500.00 8,470
Kepala Tukang 0.022 Oh 44,000.00 968
Mandor 0.005 Oh 55,000.00 275

1m' Pasang Lisplank 2 x( 3 x 20 )cm Kayu Kamper 31,553.50 18,975.00 50,528.50


Bahan
Papan Kayu Kamper 0.0145 m3 2,035,000.00 29,507.50
Paku Biasa 2" - 5" 0.060 Kg 34,100.00 2,046.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.250 Oh 38,500.00 9,625
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.075 Oh 55,000.00 4,125

1m' Pasang Lisplank 2 x( 2 x 20 )cm Kayu Kamper 19,547.00 9,790.00 29,337.00


Bahan
Papan Kayu Kamper 0.0086 m3 2,035,000.00 17,501.00
Paku Biasa 2" - 5" 0.060 Kg 34,100.00 2,046.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.050 Oh 55,000.00 2,750

1m' Pasang Lisplank 2 x( 2 x 20 )cm Kayu Borneo 19,954.00 9,790.00 29,744.00


Bahan
Papan Kayu Borneo 0.0088 m3 2,035,000.00 17,908.00
Paku Biasa 2" - 5" 0.060 Kg 34,100.00 2,046.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.050 Oh 55,000.00 2,750

1m² Pasang Rangka Dinding Pemisah Kayu Kamper 49,830.00 27,555.00 77,385.00
Bahan
Balok Kayu Kamper 0.0195 m3 1,650,000.00 32,175.00
Papan Kayu Kamper 0.007 m3 2,035,000.00 14,245.00
Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.450 Oh 38,500.00 17,325
Kepala Tukang 0.045 Oh 44,000.00 1,980
Mandor 0.075 Oh 55,000.00 4,125

1m² Pasang Rangka Dinding Pemisah Kayu Borneo 48,855.00 27,555.00 76,410.00
Bahan
Balok Kayu Borneo 0.0195 m3 1,600,000.00 31,200.00
Papan Kayu Borneo 0.007 m3 2,035,000.00 14,245.00
Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.450 Oh 38,500.00 17,325
Kepala Tukang 0.045 Oh 44,000.00 1,980
Mandor 0.075 Oh 55,000.00 4,125

1m² Pasang Dinding Pemisah Teakwood Rangkap, RangkaKayu Kamper 49,830.00 27,555.00 77,385.00
Bahan
Balok Kayu Kamper 0.0195 m3 1,650,000.00 32,175.00
Papan Kayu Kamper 0.007 m3 2,035,000.00 14,245.00
Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.450 Oh 38,500.00 17,325
Kepala Tukang 0.045 Oh 44,000.00 1,980
Mandor 0.075 Oh 55,000.00 4,125

1m² Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper 49,830.00 27,555.00 77,385.00
Bahan
Balok Kayu Kamper 0.0195 m3 1,650,000.00 32,175.00
Papan Kayu Kamper 0.007 m3 2,035,000.00 14,245.00
Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.450 Oh 38,500.00 17,325
Kepala Tukang 0.045 Oh 44,000.00 1,980
Mandor 0.075 Oh 55,000.00 4,125

1m² Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper 98,274.00 31,790.00 130,064.00
Bahan
Balok Kayu Kamper 0.0195 m3 1,650,000.00 32,175.00
Papan Kayu Kamper 0.007 m3 2,035,000.00 14,245.00
Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00
Lem Kayu 0.560 lt 9,900.00 5,544.00
Plywood 4 mm 1.000 lbr 42,900.00 42,900.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Kayu 0.600 Oh 38,500.00 23,100
Kepala Tukang 0.060 Oh 44,000.00 2,640
Mandor 0.010 Oh 55,000.00 550

1m² Pasang Dinding Lambriziring dari papan Kayu jati 201,025.00 95,370.00 296,395.00
Bahan
Papan Kayu Jati 0.007 m3 27,500,000.00 192,500.00
Paku Biasa 2" - 5" 0.100 Kg 34,100.00 3,410.00
Paku Skrup 3.5" 0.150 Kg 34,100.00 5,115.00
Tenaga
Perkerja 0.600 Oh 27,500.00 16,500
Tukang Kayu 1.800 Oh 38,500.00 69,300
Kepala Tukang 0.180 Oh 44,000.00 7,920
Mandor 0.030 Oh 55,000.00 1,650

1m² Pasang Plywood tebal 4mm, untuk dinding 18,865.00 3,976.50 22,841.50
Bahan
Plywood 4 mm 0.400 lbr 42,900.00 17,160.00
Paku Biasa ½" - 1" 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.025 Oh 27,500.00 688
Tukang Kayu 0.075 Oh 38,500.00 2,888
Kepala Tukang 0.0075 Oh 44,000.00 330
Mandor 0.0013 Oh 55,000.00 72

1m² Pasang List Plafond Kayu Profil 18,480.00 1,529.00 20,009.00


Bahan
Kayu Profil 1.050 m' 17,600.00 18,480.00
Tenaga
Perkerja 0.021 Oh 27,500.00 578
Tukang Kayu 0.021 Oh 38,500.00 809
Kepala Tukang 0.0020 Oh 44,000.00 88
Mandor 0.0010 Oh 55,000.00 55

PEKERJAAN BETON
1 m2 Membuat Lantai Kerja Beton Tumbuk 1 Pc : 3 Ps : 5 Kr 28,690.00 32,758.00 61,448.00
Bahan
Semen Portland 10.000 Kg 1,100.00 11,000.00 0.25
Pasir Beton 0.026 m3 215,000.00 5,590.00
Koral Beton 0.044 m3 275,000.00 12,100.00
Tenaga
Perkerja 1.150 Oh 27,500.00 31,625
Tukang Batu 0.020 Oh 35,750.00 715
Kepala Tukang 0.002 Oh 44,000.00 88
Mandor 0.006 Oh 55,000.00 330

1 m³ Membuat Beton Tumbuk 1 Pc : 3 Ps : 5 Kr 590,850.00 59,812.50 650,662.50


Bahan
Semen Portland 218.000 Kg 1,100.00 239,800.00 5.45 Zak
Pasir Beton 0.520 m3 215,000.00 111,800.00
Koral Beton 0.870 m3 275,000.00 239,250.00
Air 215.000 Ltr 1.075 Drum
Tenaga
Perkerja 1.650 Oh 27,500.00 45,375
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.080 Oh 55,000.00 4,400
1 m³ Membuat Beton Tumbuk 1 Pc : 3 Ps : 6 Kr 576,250.00 59,812.50 636,062.50
Bahan
Semen Portland 197.000 Kg 1,100.00 216,700.00 4.925 Zak
Pasir Beton 0.470 m3 215,000.00 101,050.00
Koral Beton 0.940 m3 275,000.00 258,500.00
Tenaga
Perkerja 1.650 Oh 27,500.00 45,375
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.080 Oh 55,000.00 4,400

1 m³ Membuat Beton Tumbuk 1 Pc : 4 Ps : 6 Kr 552,100.00 59,812.50 611,912.50


Bahan
Semen Portland 173.000 Kg 1,100.00 190,300.00 4.325 Zak
Pasir Beton 0.570 m3 215,000.00 122,550.00
Koral Beton 0.870 m3 275,000.00 239,250.00
Tenaga
Perkerja 1.650 Oh 27,500.00 45,375
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.080 Oh 55,000.00 4,400

1 m³ Membuat Beton 1 Pc : 2 Ps : 3 Kr 581,500.00 59,812.50 641,312.50


Bahan
Semen Portland 232.000 Kg 1,100.00 255,200.00 5.8 Zak
Pasir Beton 0.520 m3 215,000.00 111,800.00
Koral Beton 0.780 m3 275,000.00 214,500.00
Tenaga
Perkerja 1.650 Oh 27,500.00 45,375
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.080 Oh 55,000.00 4,400

1 m³ Membuat Beton Bertulang 1 Pc : 2 Ps : 4 Kr 652,250.00 59,812.50 712,062.50


Bahan
Semen Portland 280.000 Kg 1,100.00 308,000.00
Pasir Beton 0.450 m3 215,000.00 96,750.00
Koral Beton 0.900 m3 275,000.00 247,500.00
Tenaga
Perkerja 1.650 Oh 27,500.00 45,375
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.080 Oh 55,000.00 4,400

1 m³ Membuat Beton Bertulang 1 Pc : 2 Ps : 2.5 Kr 700,100.00 59,812.50 759,912.50


Bahan
Semen Portland 352.000 Kg 1,100.00 387,200.00
Pasir Beton 0.560 m3 215,000.00 120,400.00
Koral Beton 0.700 m3 275,000.00 192,500.00
Tenaga
Perkerja 1.650 Oh 27,500.00 45,375
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.080 Oh 55,000.00 4,400

1 m³ Membuat Beton Bertulang 1 Pc : 1.5 Ps : 3Kr 631,500.00 59,812.50 691,312.50


Bahan
Semen Portland 357.000 Kg 1,100.00 392,700.00
Pasir Beton 0.420 m3 215,000.00 90,300.00
Koral Beton 0.540 m3 275,000.00 148,500.00
Tenaga
Perkerja 1.650 Oh 27,500.00 45,375
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.080 Oh 55,000.00 4,400

1 m³ Membuat Beton Bertulang 1 Pc : 1.5 Ps : 2.5Kr 740,150.00 59,812.50 799,962.50


Bahan
Semen Portland 386.000 Kg 1,100.00 424,600.00
Pasir Beton 0.470 m3 215,000.00 101,050.00
Koral Beton 0.780 m3 275,000.00 214,500.00
Tenaga
Perkerja 1.650 Oh 27,500.00 45,375
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.080 Oh 55,000.00 4,400

1 m³ Membuat Beton Bertulang 1 Pc : 1 Ps : 2Kr 809,950.00 59,812.50 869,762.50


Bahan
Semen Portland 479.000 Kg 1,100.00 526,900.00
Pasir Beton 0.370 m3 215,000.00 79,550.00
Koral Beton 0.740 m3 275,000.00 203,500.00
Tenaga
Perkerja 1.650 Oh 27,500.00 45,375
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.080 Oh 55,000.00 4,400

1 m³ Membuat Tiang Pancang Prestressed Beton 828,892.00 59,812.50 888,704.50


Bahan
Semen Portland 479.000 Kg 1,100.00 526,900.00
Pasir Beton 0.370 m3 215,000.00 79,550.00
Koral Beton 0.740 m3 275,000.00 203,500.00
Rapidrant 2.460 gln 7,700.00 18,942.00
Tenaga
Perkerja 1.650 Oh 27,500.00 45,375
Tukang Batu 0.250 Oh 35,750.00 8,938
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.080 Oh 55,000.00 4,400

1 m³ Membuat Beton Bertulang 1 Pc : 2Ps : 3 Splt 708,450.00 124,052.50 832,502.50


Bahan
Semen Portland 336.000 Kg 1,100.00 369,600.00
Pasir Beton 0.540 m3 215,000.00 116,100.00
Koral Beton 0.810 m3 275,000.00 222,750.00
Tenaga
Perkerja 2.000 Oh 27,500.00 55,000
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.035 Oh 44,000.00 1,540
Mandor 1.000 Oh 55,000.00 55,000

1 m³ Membuat Beton Bertulang 1 Pc : 2Ps : 4 Splt 676,900.00 124,052.50 800,952.50


Bahan
Semen Portland 291.000 Kg 1,100.00 320,100.00
Pasir Beton 0.470 m3 215,000.00 101,050.00
Koral Beton 0.930 m3 275,000.00 255,750.00
Tenaga
Perkerja 2.000 Oh 27,500.00 55,000
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.035 Oh 44,000.00 1,540
Mandor 1.000 Oh 55,000.00 55,000

1 m³ Membuat Beton Bertulang 1 Pc : 1.5Ps : 3 Splt 740,300.00 124,052.50 864,352.50


Bahan
Semen Portland 367.000 Kg 1,100.00 403,700.00
Pasir Beton 0.440 m3 215,000.00 94,600.00
Koral Beton 0.880 m3 275,000.00 242,000.00
Tenaga
Perkerja 2.000 Oh 27,500.00 55,000
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.035 Oh 44,000.00 1,540
Mandor 1.000 Oh 55,000.00 55,000

1 m³ Membuat Beton Bertulang 1 Pc : 1.5Ps : 2.5 Splt 763,200.00 124,052.50 887,252.50


Bahan
Semen Portland 400.000 Kg 1,100.00 440,000.00
Pasir Beton 0.480 m3 215,000.00 103,200.00
Koral Beton 0.800 m3 275,000.00 220,000.00
Tenaga
Perkerja 2.000 Oh 27,500.00 55,000
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.035 Oh 44,000.00 1,540
Mandor 1.000 Oh 55,000.00 55,000

1 m³ Membuat Beton Bertulang 1 Pc : 1Ps : 1Splt 931,300.00 124,052.50 1,055,352.50


Bahan
Semen Portland 615.000 Kg 1,100.00 676,500.00
Pasir Beton 0.520 m3 215,000.00 111,800.00
Koral Beton 0.520 m3 275,000.00 143,000.00
Tenaga
Perkerja 2.000 Oh 27,500.00 55,000
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.035 Oh 44,000.00 1,540
Mandor 1.000 Oh 55,000.00 55,000

1 m³ Membuat Beton Kedap Air dengan Strorox - 100 769,140.00 124,052.50 893,192.50
Bahan
Semen Portland 400.000 Kg 1,100.00 440,000.00
Pasir Beton 0.480 m3 215,000.00 103,200.00
Koral Beton 0.800 m3 275,000.00 220,000.00
Strorox - 100 1.200 Kg 4,950.00 5,940.00
Tenaga
Perkerja 2.000 Oh 27,500.00 55,000
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.035 Oh 44,000.00 1,540
Mandor 1.000 Oh 55,000.00 55,000

1 m' Memasang PVC Waterstop lebar 150 mm 36,960.00 2,689.50 39,649.50


Bahan
Waterstop lebar 150 mm 1.050 m' 35,200.00 36,960.00
Tenaga
Perkerja 0.050 Oh 27,500.00 1,375
Tukang Batu 0.030 Oh 35,750.00 1,073
Kepala Tukang 0.003 Oh 44,000.00 132
Mandor 0.002 Oh 55,000.00 110

1 m' Memasang PVC Waterstop lebar 200 mm 40,425.00 2,711.50 43,136.50


Bahan
Waterstop lebar 200 mm 1.050 m' 38,500.00 40,425.00
Tenaga
Perkerja 0.050 Oh 27,500.00 1,375
Tukang Batu 0.030 Oh 35,750.00 1,073
Kepala Tukang 0.0035 Oh 44,000.00 154
Mandor 0.002 Oh 55,000.00 110

1 m' Memasang PVC Waterstop lebar 230 mm 42,735.00 27,802.50 70,537.50


Bahan
Waterstop lebar 230 mm 1.050 m' 40,700.00 42,735.00
Tenaga
Perkerja 0.550 Oh 27,500.00 15,125
Tukang Batu 0.350 Oh 35,750.00 12,513
Mandor 0.003 Oh 55,000.00 165

1 m' Memasang PVC Waterstop lebar 250 mm 47,355.00 27,802.50 75,157.50


Bahan
Waterstop lebar 250 mm 1.050 m' 45,100.00 47,355.00
Tenaga
Perkerja 0.550 Oh 27,500.00 15,125
Tukang Batu 0.350 Oh 35,750.00 12,513
Mandor 0.003 Oh 55,000.00 165

1 m' Memasang PVC Waterstop lebar 300 mm 53,130.00 27,802.50 80,932.50


Bahan
Waterstop lebar 300 mm 1.050 m' 50,600.00 53,130.00
Tenaga
Perkerja 0.550 Oh 27,500.00 15,125
Tukang Batu 0.350 Oh 35,750.00 12,513
Mandor 0.003 Oh 55,000.00 165

1 m' Memasang PVC Waterstop lebar 320 mm 75,075.00 27,802.50 102,877.50


Bahan
Waterstop lebar 320 mm 1.050 m' 71,500.00 75,075.00
Tenaga
Perkerja 0.550 Oh 27,500.00 15,125
Tukang Batu 0.350 Oh 35,750.00 12,513
Mandor 0.003 Oh 55,000.00 165

1 Kg Pembesian dengan Besi Polos atau Besi Ulir 17,646.75 490.05 18,136.80
Bahan
Besi Beton ( Polos / Ulir ) 1.050 Kg 16,500.00 17,325.00
Kawat Beton 0.015 Kg 21,450.00 321.75
Tenaga
Perkerja 0.007 Oh 27,500.00 193
Tukang Besi 0.007 Oh 35,750.00 250
Kepala Tukang 0.0007 Oh 44,000.00 31
Mandor 0.0003 Oh 55,000.00 17

1 Kg Kabel Presstressed Polos / Strands 17,539.50 354.75 17,894.25


Bahan
Besi Beton ( Polos / Ulir ) 1.050 Kg 16,500.00 17,325.00
Kawat Beton 0.010 Kg 21,450.00 214.50
Tenaga
Perkerja 0.005 Oh 27,500.00 138
Tukang Besi 0.005 Oh 35,750.00 179
Kepala Tukang 0.0005 Oh 44,000.00 22
Mandor 0.0003 Oh 55,000.00 17

1 Kg Jaring Kawat Baja 39,707.25 1,773.75 41,481.00


Bahan
Besi Jaring Kawat Baja 1.020 Kg 22,000.00 22,440.00
Kawat Beton 0.805 Kg 21,450.00 17,267.25
Tenaga
Perkerja 0.025 Oh 27,500.00 688
Tukang Besi 0.025 Oh 35,750.00 894
Kepala Tukang 0.0025 Oh 44,000.00 110
Mandor 0.0015 Oh 55,000.00 83

1 m2 Pasang Bekisting 108,955.00 22,737.00 131,692.00


Bahan
Kayu Terentang 0.040 m3 1,540,000.00 61,600.00
Paku Biasa 2" - 5" 0.400 Kg 34,100.00 13,640.00
Minyak Bekisting 0.200 Lt 4,950.00 990.00
Plywood 9 mm 0.350 lbr 49,500.00 17,325.00
Dolken Kayu Galam Ø 8 - 10 / 4m 2.000 btg 7,700.00 15,400.00
Tenaga
Perkerja 0.300 Oh 27,500.00 8,250
Tukang Kayu 0.330 Oh 38,500.00 12,705
Kepala Tukang 0.0330 Oh 44,000.00 1,452
Mandor 0.0060 Oh 55,000.00 330

1 m2 Pasangan Stoot Werk 196,537.00 21,560.00 218,097.00


Bahan
Kayu Kaso 5 / 7 (borneo) 0.0882 m3 2,035,000.00 179,487.00
Paku 0.5000 kg 34,100.00 17,050.00
Tenaga
Perkerja 0.1500 org 27,500.00 4,125
Tukang Kayu 0.2000 org 38,500.00 7,700
Kepala Tukang 0.2000 org 44,000.00 8,800
Mandor 0.0170 org 55,000.00 935

1 m2 Pasang Bekisting untuk Pondasi 72,325.00 19,679.00 92,004.00


Bahan
Kayu Terentang 0.040 m3 1,540,000.00 61,600.00
Paku Biasa 2" - 5" 0.300 Kg 34,100.00 10,230.00
Minyak Bekisting 0.100 Lt 4,950.00 495.00
Tenaga
Perkerja 0.300 Oh 27,500.00 8,250
Tukang Kayu 0.260 Oh 38,500.00 10,010
Kepala Tukang 0.0260 Oh 44,000.00 1,144
Mandor 0.0050 Oh 55,000.00 275

1 m2 Pasang Bekisting untuk Sloof 72,325.00 19,679.00 92,004.00


Bahan
Kayu Terentang 0.040 m3 1,540,000.00 61,600.00
Paku Biasa 2" - 5" 0.300 Kg 34,100.00 10,230.00
Minyak Bekisting 0.100 Lt 4,950.00 495.00
Tenaga
Perkerja 0.300 Oh 27,500.00 8,250
Tukang Kayu 0.260 Oh 38,500.00 10,010
Kepala Tukang 0.0260 Oh 44,000.00 1,144
Mandor 0.0050 Oh 55,000.00 275

1 m2 Pasang Bekisting untuk Kolom 132,955.00 22,737.00 155,692.00


Bahan
Kayu Terentang 0.040 m3 1,540,000.00 61,600.00
Paku Biasa 2" - 5" 0.400 Kg 34,100.00 13,640.00
Minyak Bekisting 0.200 Lt 4,950.00 990.00
Balok Kayu Borneo 0.015 m3 1,600,000.00 24,000.00
Plywood 9 mm 0.350 lbr 49,500.00 17,325.00
Dolken Kayu Galam Ø 8 - 10 / 4m 2.000 btg 7,700.00 15,400.00
Tenaga
Perkerja 0.300 Oh 27,500.00 8,250
Tukang Kayu 0.330 Oh 38,500.00 12,705
Kepala Tukang 0.0330 Oh 44,000.00 1,452
Mandor 0.0060 Oh 55,000.00 330

1 m2 Pasang Bekisting untuk Balok 137,755.00 23,287.00 161,042.00


Bahan
Kayu Terentang 0.040 m3 1,540,000.00 61,600.00
Paku Biasa 2" - 5" 0.400 Kg 34,100.00 13,640.00
Minyak Bekisting 0.200 Lt 4,950.00 990.00
Balok Kayu Borneo 0.018 m3 1,600,000.00 28,800.00
Plywood 9 mm 0.350 lbr 49,500.00 17,325.00
Dolken Kayu Galam Ø 8 - 10 / 4m 2.000 btg 7,700.00 15,400.00
Tenaga
Perkerja 0.320 Oh 27,500.00 8,800
Tukang Kayu 0.330 Oh 38,500.00 12,705
Kepala Tukang 0.0330 Oh 44,000.00 1,452
Mandor 0.0060 Oh 55,000.00 330

1 m2 Pasang Bekisting untuk Lantai 163,755.00 22,379.50 186,134.50


Bahan
Kayu Terentang 0.040 m3 1,540,000.00 61,600.00
Paku Biasa 2" - 5" 0.400 Kg 34,100.00 13,640.00
Minyak Bekisting 0.200 Lt 4,950.00 990.00
Balok Kayu Borneo 0.015 m3 1,600,000.00 24,000.00
Plywood 9 mm 0.350 lbr 49,500.00 17,325.00
Dolken Kayu Galam Ø 8 - 10 / 4m 6.000 btg 7,700.00 46,200.00
Tenaga
Perkerja 0.320 Oh 27,500.00 8,800
Tukang Batu 0.330 Oh 35,750.00 11,798
Kepala Tukang 0.033 Oh 44,000.00 1,452
Mandor 0.006 Oh 55,000.00 330

1 m2 Pasang Bekisting untuk Dinding 449,755.00 23,287.00 473,042.00


Bahan
Kayu Terentang 0.040 m3 1,540,000.00 61,600.00
Paku Biasa 2" - 5" 0.400 Kg 34,100.00 13,640.00
Minyak Bekisting 0.200 Lt 4,950.00 990.00
Balok Kayu Borneo 0.015 m3 1,600,000.00 24,000.00
Plywood 9 mm 0.350 lbr 49,500.00 17,325.00
Dolken Kayu Galam Ø 8 - 10 / 4m 6.000 btg 7,700.00 46,200.00
Formtie / penjaga jarak bekisting 4.000 bh 71,500.00 286,000.00
Tenaga
Perkerja 0.320 Oh 27,500.00 8,800
Tukang Kayu 0.330 Oh 38,500.00 12,705
Kepala Tukang 0.033 Oh 44,000.00 1,452
Mandor 0.006 Oh 55,000.00 330

1 m2 Pasang Bekisting untuk Tangga 117,307.50 23,287.00 140,594.50


Bahan
Kayu Terentang 0.030 m3 1,540,000.00 46,200.00
Paku Biasa 2" - 5" 0.400 Kg 34,100.00 13,640.00
Minyak Bekisting 0.150 Lt 4,950.00 742.50
Balok Kayu Borneo 0.015 m3 1,600,000.00 24,000.00
Plywood 9 mm 0.350 lbr 49,500.00 17,325.00
Dolken Kayu Galam Ø 8 - 10 / 4m 2.000 btg 7,700.00 15,400.00
Tenaga
Perkerja 0.320 Oh 27,500.00 8,800
Tukang Kayu 0.330 Oh 38,500.00 12,705
Kepala Tukang 0.033 Oh 44,000.00 1,452
Mandor 0.006 Oh 55,000.00 330

1 m³ Membuat Pondasi Beton Bertulang ( 150 Kg + bekisting ) 3,490,992.50 217,195.00 3,708,187.50


Bahan
Kayu Terentang 0.200 m3 1,540,000.00 308,000.00
Paku Biasa 2" - 5" 1.500 Kg 34,100.00 51,150.00
Minyak Bekisting 0.400 Lt 4,950.00 1,980.00
Besi Beton Polos 150.000 Kg 16,000.00 2,400,000.00
Kawat Beton 2.250 Kg 21,450.00 48,262.50
Semen Portland 323.000 Kg 1,100.00 355,300.00
Pasir Beton 0.520 m3 215,000.00 111,800.00
Koral Beton 0.780 m3 275,000.00 214,500.00
Tenaga
Perkerja 3.900 Oh 27,500.00 107,250
Tukang Batu 0.350 Oh 35,750.00 12,513
Tukang Kayu 1.040 Oh 38,500.00 40,040
Tukang Besi 1.050 Oh 35,750.00 37,538
Kepala Tukang 0.245 Oh 44,000.00 10,780
Mandor 0.165 Oh 55,000.00 9,075

1 m³ Membuat Sloof Beton Bertulang ( 200 Kg + bekisting ) 4,432,920.00 279,911.50 4,712,831.50


Bahan
Kayu Terentang 0.270 m3 1,540,000.00 415,800.00
Paku Biasa 2" - 5" 2.000 Kg 34,100.00 68,200.00
Minyak Bekisting 0.600 Lt 4,950.00 2,970.00
Besi Beton Polos 200.000 Kg 16,000.00 3,200,000.00
Kawat Beton 3.000 Kg 21,450.00 64,350.00
Semen Portland 323.000 Kg 1,100.00 355,300.00
Pasir Beton 0.520 m3 215,000.00 111,800.00
Koral Beton 0.780 m3 275,000.00 214,500.00
Tenaga
Perkerja 4.850 Oh 27,500.00 133,375
Tukang Batu 0.350 Oh 35,750.00 12,513
Tukang Kayu 1.560 Oh 38,500.00 60,060
Tukang Besi 1.400 Oh 35,750.00 50,050
Kepala Tukang 0.331 Oh 44,000.00 14,564
Mandor 0.170 Oh 55,000.00 9,350

1 m³ Membuat Kolom Beton Bertulang ( 300 Kg + bekisting ) 6,961,925.00 454,217.50 7,416,142.50


Bahan
Kayu Terentang 0.400 m3 1,540,000.00 616,000.00
Paku Biasa 2" - 5" 4.000 Kg 34,100.00 136,400.00
Minyak Bekisting 2.000 Lt 4,950.00 9,900.00
Besi Beton Polos 300.000 Kg 16,000.00 4,800,000.00
Kawat Beton 4.500 Kg 21,450.00 96,525.00
Semen Portland 323.000 Kg 1,100.00 355,300.00
Pasir Beton 0.520 m3 215,000.00 111,800.00
Koral Beton 0.780 m3 275,000.00 214,500.00
Kayu Balok Borneo 0.150 m3 1,815,000.00 272,250.00
Plywood 9 mm 3.500 lbr 49,500.00 173,250.00
Dolken Ø 8 / 4 m 20.000 btg 8,800.00 176,000.00
Tenaga
Perkerja 7.300 Oh 27,500.00 200,750
Tukang Batu 0.350 Oh 35,750.00 12,513
Tukang Kayu 3.300 Oh 38,500.00 127,050
Tukang Besi 2.100 Oh 35,750.00 75,075
Kepala Tukang 0.570 Oh 44,000.00 25,080
Mandor 0.250 Oh 55,000.00 13,750

1 m³ Membuat Balok Beton Bertulang ( 200 Kg + bekisting ) 5,089,290.00 365,722.50 5,455,012.50


Bahan
Kayu Terentang 0.320 m3 1,540,000.00 492,800.00
Paku Biasa 2" - 5" 3.200 Kg 34,100.00 109,120.00
Minyak Bekisting 1.600 Lt 4,950.00 7,920.00
Besi Beton Polos 200.000 Kg 16,000.00 3,200,000.00
Kawat Beton 3.000 Kg 21,450.00 64,350.00
Semen Portland 323.000 Kg 1,100.00 355,300.00 8
Pasir Beton 0.520 m3 215,000.00 111,800.00
Koral Beton 0.780 m3 275,000.00 214,500.00
Kayu Balok Borneo 0.140 m3 1,815,000.00 254,100.00
Plywood 9 mm 2.800 lbr 49,500.00 138,600.00
Dolken Ø 8 / 4 m 16.000 btg 8,800.00 140,800.00
Tenaga
Perkerja 5.960 Oh 27,500.00 163,900
Tukang Batu 0.350 Oh 35,750.00 12,513
Tukang Kayu 2.800 Oh 38,500.00 107,800
Tukang Besi 1.400 Oh 35,750.00 50,050
Kepala Tukang 0.455 Oh 44,000.00 20,020
Mandor 0.208 Oh 55,000.00 11,440

1 m³ Membuat Balok Beton Bertulang ( 150 Kg + bekisting ) 4,377,702.50 346,005.00 4,723,707.50


Bahan
Kayu Terentang 0.320 m3 1,540,000.00 492,800.00
Paku Biasa 2" - 5" 3.200 Kg 34,100.00 109,120.00
Minyak Bekisting 1.600 Lt 4,950.00 7,920.00
Besi Beton Polos 150.000 Kg 16,000.00 2,400,000.00
Kawat Beton 2.250 Kg 21,450.00 48,262.50
Semen Portland 323.000 Kg 1,100.00 355,300.00
Pasir Beton 0.520 m3 215,000.00 111,800.00
Koral Beton 0.780 m3 275,000.00 214,500.00
Kayu Balok Borneo 0.120 m3 1,815,000.00 217,800.00
Plywood 9 mm 2.800 lbr 49,500.00 138,600.00
Dolken Ø 8 / 4 m 32.000 btg 8,800.00 281,600.00
Tenaga
Perkerja 5.800 Oh 27,500.00 159,500
Tukang Batu 0.350 Oh 35,750.00 12,513
Tukang Kayu 2.800 Oh 38,500.00 107,800
Tukang Besi 1.050 Oh 35,750.00 37,538
Kepala Tukang 0.420 Oh 44,000.00 18,480
Mandor 0.185 Oh 55,000.00 10,175

1 m³ Membuat Dinding Beton Bertulang ( 150 Kg + bekisting ) 4,256,702.50 333,905.00 4,590,607.50


Bahan
Kayu Terentang 0.240 m3 1,540,000.00 369,600.00
Paku Biasa 2" - 5" 3.200 Kg 34,100.00 109,120.00
Minyak Bekisting 1.600 Lt 4,950.00 7,920.00
Besi Beton Polos 150.000 Kg 16,000.00 2,400,000.00
Kawat Beton 2.250 Kg 21,450.00 48,262.50
Semen Portland 323.000 Kg 1,100.00 355,300.00
Pasir Beton 0.520 m3 215,000.00 111,800.00
Koral Beton 0.780 m3 275,000.00 214,500.00
Kayu Balok Borneo 0.160 m3 1,815,000.00 290,400.00
Plywood 9 mm 2.800 lbr 49,500.00 138,600.00
Dolken Ø 8 / 4 m 24.000 btg 8,800.00 211,200.00
Tenaga
Perkerja 5.600 Oh 27,500.00 154,000
Tukang Batu 0.350 Oh 35,750.00 12,513
Tukang Kayu 2.640 Oh 38,500.00 101,640
Tukang Besi 1.050 Oh 35,750.00 37,538
Kepala Tukang 0.400 Oh 44,000.00 17,600
Mandor 0.193 Oh 55,000.00 10,615

1 m³ Membuat Tangga Beton Bertulang ( 200 Kg + bekisting ) 4,876,715.00 334,042.50 5,210,757.50


Bahan
Kayu Terentang 0.250 m3 1,540,000.00 385,000.00
Paku Biasa 2" - 5" 3.000 Kg 34,100.00 102,300.00
Minyak Bekisting 1.200 Lt 4,950.00 5,940.00
Besi Beton Polos 200.000 Kg 16,000.00 3,200,000.00
Kawat Beton 3.000 Kg 21,450.00 64,350.00
Semen Portland 323.000 Kg 1,100.00 355,300.00
Pasir Beton 0.520 m3 215,000.00 111,800.00
Koral Beton 0.780 m3 275,000.00 214,500.00
Kayu Balok Borneo 0.105 m3 1,815,000.00 190,575.00
Plywood 9 mm 2.500 lbr 49,500.00 123,750.00
Dolken Ø 8 / 4 m 14.000 btg 8,800.00 123,200.00
Tenaga
Perkerja 5.600 Oh 27,500.00 154,000
Tukang Batu 0.350 Oh 35,750.00 12,513
Tukang Kayu 2.300 Oh 38,500.00 88,550
Tukang Besi 1.400 Oh 35,750.00 50,050
Kepala Tukang 0.405 Oh 44,000.00 17,820
Mandor 0.202 Oh 55,000.00 11,110

1 m³ Membuat Kolom Penguat Beton Bertulang (11 x 11) cm 69,238.50 4,279.00 73,517.50
Bahan
Kayu Terentang 0.002 m3 1,540,000.00 3,080.00
Paku Biasa 2" - 5" 0.010 Kg 34,100.00 341.00
Besi Beton Polos 3.000 Kg 16,000.00 48,000.00
Kawat Beton 0.450 Kg 21,450.00 9,652.50
Semen Portland 4.000 Kg 1,100.00 4,400.00
Pasir Beton 0.006 m3 215,000.00 1,290.00
Koral Beton 0.009 m3 275,000.00 2,475.00
Tenaga
Perkerja 0.060 Oh 27,500.00 1,650
Tukang Batu 0.020 Oh 35,750.00 715
Tukang Kayu 0.020 Oh 38,500.00 770
Tukang Besi 0.020 Oh 35,750.00 715
Kepala Tukang 0.006 Oh 44,000.00 264
Mandor 0.003 Oh 55,000.00 165

1 m³ Membuat Ring Balok Beton Bertulang (10 x 15) cm 79,087.50 17,712.75 96,800.25
Bahan
Kayu Albasiah 0.003 m3 495,000.00 1,485.00
Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00
Besi Beton Polos 3.600 Kg 16,000.00 57,600.00
Kawat Beton 0.050 Kg 21,450.00 1,072.50
Semen Portland 5.500 Kg 1,100.00 6,050.00
Pasir Beton 0.009 m3 215,000.00 1,935.00
Koral Beton 0.015 m3 275,000.00 4,125.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Batu 0.330 Oh 35,750.00 11,798
Tukang Kayu 0.033 Oh 38,500.00 1,271
Tukang Besi 0.033 Oh 35,750.00 1,180
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.005 Oh 55,000.00 275

V PEKERJAAN PENTUP ATAP


1m² Pasang Atap Genteng Palentong Kecil 41,250.00 7,804.50 49,054.50
Bahan
Genteng Palentong 25.000 bh 1,650.00 41,250.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.075 Oh 38,500.00 2,888
Kepala Tukang 0.008 Oh 44,000.00 352
Mandor 0.008 Oh 55,000.00 440

1m² Pasang Atap Genteng Kodok / Glazzur 126,500.00 7,804.50 134,304.50


Bahan
Genteng Kodok 25.000 bh 5,060.00 126,500.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.075 Oh 38,500.00 2,888
Kepala Tukang 0.008 Oh 44,000.00 352
Mandor 0.008 Oh 55,000.00 440

1m² Pasang Atap Genteng Palentong Super / Besar 29,040.00 7,139.00 36,179.00
Bahan
Genteng Palentong Super 12.000 bh 2,420.00 29,040.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.060 Oh 38,500.00 2,310
Kepala Tukang 0.006 Oh 44,000.00 264
Mandor 0.008 Oh 55,000.00 440

1m' Pasang Genteng Bubung Palentong 40,430.00 19,690.00 60,120.00


Bahan
Genteng Bubung Palentong 5.000 bh 4,950.00 24,750.00
Semen Portland 8.000 Kg 1,100.00 8,800.00
Pasir Pasang 0.032 m3 215,000.00 6,880.00
Tenaga
Perkerja 0.400 Oh 27,500.00 11,000
Tukang Kayu 0.200 Oh 38,500.00 7,700
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.002 Oh 55,000.00 110

1m' Pasang Genteng Bubung Kodok Glazzur 54,180.00 19,690.00 73,870.00


Bahan
Genteng Bubung Kodok 5.000 bh 7,700.00 38,500.00
Semen Portland 8.000 Kg 1,100.00 8,800.00
Pasir Pasang 0.032 m3 215,000.00 6,880.00
Tenaga
Perkerja 0.400 Oh 27,500.00 11,000
Tukang Kayu 0.200 Oh 38,500.00 7,700
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.002 Oh 55,000.00 110

1m' Pasang Genteng Bubung Palentong Besar 35,480.00 19,690.00 55,170.00


Bahan
Genteng Bubung Palentong 4.000 bh 4,950.00 19,800.00
Semen Portland 8.000 Kg 1,100.00 8,800.00
Pasir Pasang 0.032 m3 215,000.00 6,880.00
Tenaga
Perkerja 0.400 Oh 27,500.00 11,000
Tukang Kayu 0.200 Oh 38,500.00 7,700
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.002 Oh 55,000.00 110

1m' Pasang Rooflight Fiberglass ( 180 x 90 ) cm 232,705.00 7,122.50 239,827.50


Bahan
Roof Light Fiberglass 0.600 lbr 385,000.00 231,000.00
Paku 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.067 Oh 38,500.00 2,580
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385

1m' Pasang Atap Asbes Gelombang ( 2.50 x 0.92 m ) X 5mm 13,992.00 7,529.50 21,521.50
Bahan
Asbes Gelombang 0.500 lbr 19,800.00 9,900.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.075 Oh 38,500.00 2,888
Kepala Tukang 0.008 Oh 44,000.00 352
Mandor 0.008 Oh 55,000.00 440

1m' Pasang Atap Asbes Gelombang ( 2.25 x 0.92 m ) X 5mm 15,972.00 7,529.50 23,501.50
Bahan
Asbes Gelombang 0.600 lbr 19,800.00 11,880.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.075 Oh 38,500.00 2,888
Kepala Tukang 0.008 Oh 44,000.00 352
Mandor 0.008 Oh 55,000.00 440

1m' Pasang Atap Asbes Gelombang ( 2.00 x 0.92 m ) X 5mm 15,972.00 7,238.00 23,210.00
Bahan
Asbes Gelombang 0.600 lbr 19,800.00 11,880.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.070 Oh 38,500.00 2,695
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385

1m' Pasang Atap Asbes Gelombang ( 1.80 x 0.92 m ) X 5mm 18,942.00 7,238.00 26,180.00
Bahan
Asbes Gelombang 0.750 lbr 19,800.00 14,850.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.070 Oh 38,500.00 2,695
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385

1m² Pasang Atap Asbes Gelombang ( 300 x 1.05 m ) X 4mm 11,022.00 7,238.00 18,260.00
Bahan
Asbes Gelombang 0.350 lbr 19,800.00 6,930.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.070 Oh 38,500.00 2,695
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385

1m² Pasang Atap Asbes Gelombang ( 270 x 1.05 m ) X 4mm 12,408.00 7,238.00 19,646.00
Bahan
Asbes Gelombang 0.420 lbr 19,800.00 8,316.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.070 Oh 38,500.00 2,695
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385

1m² Pasang Atap Asbes Gelombang ( 240 x 1.05 m ) X 4mm 12,804.00 7,122.50 19,926.50
Bahan
Asbes Gelombang 0.440 lbr 19,800.00 8,712.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.067 Oh 38,500.00 2,580
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385

1m² Pasang Atap Asbes Gelombang ( 210 x 1.05 m ) X 4mm 14,190.00 7,122.50 21,312.50
Bahan
Asbes Gelombang 0.510 lbr 19,800.00 10,098.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.067 Oh 38,500.00 2,580
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385

1m² Pasang Atap Asbes Gelombang ( 1.5 x 1.05 m ) X 4mm 19,932.00 7,122.50 27,054.50
Bahan
Asbes Gelombang 0.800 lbr 19,800.00 15,840.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.067 Oh 38,500.00 2,580
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385

1m² Pasang Atap Asbes Gelombang ( 3.00 x 1.08 m ) X 6mm 11,418.00 7,122.50 18,540.50
Bahan
Asbes Gelombang 0.370 lbr 19,800.00 7,326.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.067 Oh 38,500.00 2,580
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385

1m² Pasang Atap Asbes Gelombang ( 2.7 x 1.08 m ) X 6mm 11,616.00 7,122.50 18,738.50
Bahan
Asbes Gelombang 0.380 lbr 19,800.00 7,524.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.067 Oh 38,500.00 2,580
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385

1m² Pasang Atap Asbes Gelombang ( 2.4 x 1.08 m ) X 6mm 13,200.00 7,122.50 20,322.50
Bahan
Asbes Gelombang 0.460 lbr 19,800.00 9,108.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.067 Oh 38,500.00 2,580
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385

1m² Pasang Atap Asbes Gelombang ( 2.1 x 1.08 m ) X 6mm 13,794.00 7,122.50 20,916.50
Bahan
Asbes Gelombang 0.490 lbr 19,800.00 9,702.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.067 Oh 38,500.00 2,580
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385

1m² Pasang Atap Asbes Gelombang ( 1.80 x 1.08 m ) X 6mm 15,378.00 7,122.50 22,500.50
Bahan
Asbes Gelombang 0.570 lbr 19,800.00 11,286.00
Paku Pancing 60 x 230 0.120 Kg 34,100.00 4,092.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Kayu 0.067 Oh 38,500.00 2,580
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.007 Oh 55,000.00 385

1m' Pasang Bubung Stel Gelombang 0.92m 252,120.00 7,914.50 260,034.50


Bahan
Asbes Gelombang 2.400 lbr 19,800.00 47,520.00
Paku Pancing 60 x 230 6.000 Kg 34,100.00 204,600.00
Tenaga
Perkerja 0.084 Oh 27,500.00 2,310
Tukang Kayu 0.125 Oh 38,500.00 4,813
Kepala Tukang 0.013 Oh 44,000.00 572
Mandor 0.004 Oh 55,000.00 220

1m' Pasang Nok Stel Gelombang 0.92m 252,120.00 7,914.50 260,034.50


Bahan
Asbes Gelombang 2.400 lbr 19,800.00 47,520.00
Paku Skrup 3.5" 6.000 bh 34,100.00 204,600.00
Tenaga
Perkerja 0.084 Oh 27,500.00 2,310
Tukang Kayu 0.125 Oh 38,500.00 4,813
Kepala Tukang 0.013 Oh 44,000.00 572
Mandor 0.004 Oh 55,000.00 220

1m' Pasang Nok Stel Gelombang 1.05m 246,180.00 7,914.50 254,094.50


Bahan
Asbes Gelombang 2.100 lbr 19,800.00 41,580.00
Paku Skrup 3.5" 6.000 bh 34,100.00 204,600.00
Tenaga
Perkerja 0.084 Oh 27,500.00 2,310
Tukang Kayu 0.125 Oh 38,500.00 4,813
Kepala Tukang 0.013 Oh 44,000.00 572
Mandor 0.004 Oh 55,000.00 220

1m' Pasang Nok Stel Gelombang 1.08m 245,190.00 7,914.50 253,104.50


Bahan
Asbes Gelombang 2.050 lbr 19,800.00 40,590.00
Paku Skrup 3.5" 6.000 bh 34,100.00 204,600.00
Tenaga
Perkerja 0.084 Oh 27,500.00 2,310
Tukang Kayu 0.125 Oh 38,500.00 4,813
Kepala Tukang 0.013 Oh 44,000.00 572
Mandor 0.004 Oh 55,000.00 220

1m' Pasang Nok Paten 0.92m 208,560.00 7,914.50 216,474.50


Bahan
Nok Paten 1.200 lbr 3,300.00 3,960.00
Paku Skrup 3.5" 6.000 bh 34,100.00 204,600.00
Tenaga
Perkerja 0.084 Oh 27,500.00 2,310
Tukang Kayu 0.125 Oh 38,500.00 4,813
Kepala Tukang 0.013 Oh 44,000.00 572
Mandor 0.004 Oh 55,000.00 220

1m' Pasang Nok Paten 1.05m 208,560.00 7,914.50 216,474.50


Bahan
Nok Paten 1.200 lbr 3,300.00 3,960.00
Paku Skrup 3.5" 6.000 bh 34,100.00 204,600.00
Tenaga
Perkerja 0.084 Oh 27,500.00 2,310
Tukang Kayu 0.125 Oh 38,500.00 4,813
Kepala Tukang 0.013 Oh 44,000.00 572
Mandor 0.004 Oh 55,000.00 220

1m' Pasang Nok Paten 1.08m 208,560.00 7,914.50 216,474.50


Bahan
Nok Paten 1.200 lbr 3,300.00 3,960.00
Paku Skrup 3.5" 6.000 bh 34,100.00 204,600.00
Tenaga
Perkerja 0.084 Oh 27,500.00 2,310
Tukang Kayu 0.125 Oh 38,500.00 4,813
Kepala Tukang 0.013 Oh 44,000.00 572
Mandor 0.004 Oh 55,000.00 220

1m' Pasang Nok Stel rata 0.92m 209,440.00 9,317.00 218,757.00


Bahan
Nok Stel rata 1.100 lbr 4,400.00 4,840.00
Paku Skrup 3.5" 6.000 bh 34,100.00 204,600.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.150 Oh 38,500.00 5,775
Kepala Tukang 0.013 Oh 44,000.00 572
Mandor 0.004 Oh 55,000.00 220

1m' Pasang Nok Stel rata 1.05m 209,440.00 7,914.50 217,354.50


Bahan
Nok Stel rata 1.100 lbr 4,400.00 4,840.00
Paku Skrup 3.5" 6.000 bh 34,100.00 204,600.00
Tenaga
Perkerja 0.084 Oh 27,500.00 2,310
Tukang Kayu 0.125 Oh 38,500.00 4,813
Kepala Tukang 0.013 Oh 44,000.00 572
Mandor 0.004 Oh 55,000.00 220

1m² Pasang Atap Genteng Beton 92,983.00 10,340.00 103,323.00


Bahan
Genteng Beton 11.000 lbr 8,360.00 91,960.00
Paku Biasa 2" - 5" 0.030 bh 34,100.00 1,023.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.010 Oh 55,000.00 550

1m² Pasang Atap Genteng Aspal 92,378.00 17,732.00 110,110.00


Bahan
Genteng Aspal 6.900 lbr 11,000.00 75,900.00
Plywood 4 mm 0.350 lbr 42,900.00 15,015.00
Paku Biasa 1/2" - 1" 0.030 Kg 34,100.00 1,023.00
Plastic Aerator 0.500 Bh 880.00 440.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Kayu 0.300 Oh 38,500.00 11,550
Kepala Tukang 0.003 Oh 44,000.00 132
Mandor 0.010 Oh 55,000.00 550

1m² Pasang Atap Genteng Metal 51,475.60 9,845.00 61,320.60


Bahan
Genteng Metal 1.020 lbr 43,780.00 44,655.60
Paku Biasa 2" - 5" 0.200 Kg 34,100.00 6,820.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.001 Oh 55,000.00 55

1m² Pasang Atap Sirap 34,320.00 15,730.00 50,050.00


Bahan
Genteng Sirap 60.000 lbr 458.33 27,500.00
Paku Biasa ½" - 1" 0.200 Kg 34,100.00 6,820.00
Tenaga
Perkerja 0.166 Oh 27,500.00 4,565
Tukang Kayu 0.250 Oh 38,500.00 9,625
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.008 Oh 55,000.00 440

1m' Pasang Nok Genteng Beton 51,045.00 20,680.00 71,725.00


Bahan
Genteng Beton 3.500 lbr 8,360.00 29,260.00
Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00
Semen abu -abu 10.800 Kg 1,100.00 11,880.00
Pasir Pasang 0.032 m3 215,000.00 6,880.00
Semen Warna 1.000 Kg 1,320.00 1,320.00
Tenaga
Perkerja 0.400 Oh 27,500.00 11,000
Tukang Kayu 0.200 Oh 38,500.00 7,700
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.020 Oh 55,000.00 1,100

1m' Pasang Nok Genteng Aspal 29,305.00 14,492.50 43,797.50


Bahan
Genteng Aspal 2.000 lbr 11,000.00 22,000.00
Paku Biasa ½" - 1" 0.050 Kg 34,100.00 1,705.00
Balok Kayu Borneo 0.0035 Kg 1,600,000.00 5,600.00
Tenaga
Perkerja 0.125 Oh 27,500.00 3,438
Tukang Kayu 0.250 Oh 38,500.00 9,625
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.006 Oh 55,000.00 330

1m' Pasang Nok Genteng Metal 44,055.00 14,025.00 58,080.00


Bahan
Genteng Decra Bond 1.100 lbr 38,500.00 42,350.00
Paku Biasa ½" - 1" 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.250 Oh 27,500.00 6,875
Tukang Kayu 0.150 Oh 38,500.00 5,775
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.013 Oh 55,000.00 715

1m' Pasang Nok Genteng Metal 44,055.00 14,025.00 58,080.00


Bahan
Genteng Decra Bond 1.100 lbr 38,500.00 42,350.00
Paku Biasa ½" - 1" 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.250 Oh 27,500.00 6,875
Tukang Kayu 0.150 Oh 38,500.00 5,775
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.013 Oh 55,000.00 715

1m' Pasang Nok Sirap 27,291.00 14,492.50 41,783.50


Bahan
Seng Plat 3" x 6" BJLS 28 0.400 Lbr 38,500.00 15,400.00
Paku Biasa ½" - 1" 0.060 Kg 34,100.00 2,046.00
Paku Biasa 2" - 5" 0.050 Kg 34,100.00 1,705.00
Papan Kayu Borneo tebal 3cm 0.004 m3 2,035,000.00 8,140.00
Tenaga
Perkerja 0.125 Oh 27,500.00 3,438
Tukang Kayu 0.250 Oh 38,500.00 9,625
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.006 Oh 55,000.00 330

1m² Pasang Atap Seng Gelombang 36,014.00 6,204.00 42,218.00


Bahan
Seng Gelombang 3" x 6" BJLS 28 0.700 Lbr 49,500.00 34,650.00
Paku Biasa ½" - 1" 0.040 Kg 34,100.00 1,364.00
Tenaga
Perkerja 0.120 Oh 27,500.00 3,300
Tukang Kayu 0.060 Oh 38,500.00 2,310
Kepala Tukang 0.006 Oh 44,000.00 264
Mandor 0.006 Oh 55,000.00 330

1m² Pasang Atap Nok Seng 12,914.00 3,789.50 16,703.50


Bahan
Seng Plat 3" x 6" BJLS 28 0.300 Lbr 38,500.00 11,550.00
Paku Biasa ½" - 1" 0.040 Kg 34,100.00 1,364.00
Tenaga
Perkerja 0.015 Oh 27,500.00 413
Tukang Kayu 0.070 Oh 38,500.00 2,695
Kepala Tukang 0.008 Oh 44,000.00 352
Mandor 0.006 Oh 55,000.00 330

1m² Pasang Atap Alluminium 46,882.00 3,982.00 50,864.00


Bahan
Atap Alluminium Gelombang tebal 0.55 1.050 m2 44,000.00 46,200.00
Paku Hak Pnjang 15 cm 0.020 Kg 34,100.00 682.00
Tenaga
Perkerja 0.015 Oh 27,500.00 413
Tukang Kayu 0.075 Oh 38,500.00 2,888
Kepala Tukang 0.008 Oh 44,000.00 352
Mandor 0.006 Oh 55,000.00 330

1m² Pasang Nok Alluminium 9,284.00 42,240.00 51,524.00


Bahan
Nok standar 40 cm 18, swg 22 1.200 m2 6,600.00 7,920.00
Paku Hak Pnjang 15 cm 0.040 Kg 34,100.00 1,364.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 1.000 Oh 38,500.00 38,500
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.010 Oh 55,000.00 550

1m² Pasang Alluminium Foil / Sisalation 4,042.50 6,710.00 10,752.50


Bahan
Sisalation / Alluminium Foil 1.050 m2 3,850.00 4,042.50
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.050 Oh 38,500.00 1,925
Kepala Tukang 0.005 Oh 44,000.00 220
Mandor 0.008 Oh 55,000.00 440

VII PEKERJAAN LANGIT - LANGIT


1 m2 Pas. Rangka Plapond Kayu Kls I (Hanya Rangka) 45,617.00 16,046.25 61,663.25
Bahan
Kayu Balok Borneo 0.0210 m3 1,815,000.00 38,115.00
Paku 0.2200 kg 34,100.00 7,502.00
Tenaga
Perkerja 0.1875 org 27,500.00 5,156 0.00
Tukang Kayu 0.2250 org 38,500.00 8,663 0.00
Kepala Tukang 0.0375 org 44,000.00 1,650 0.00
Mandor 0.0105 org 55,000.00 578 0.00

1 m² Langit - langit Asbes ( 1.00 x 1.00 )m tebal 5 mm 48,741.00 3,910.50 52,651.50


Bahan
Pelat Asbes tebal 5 mm 1.100 lbr 44,000.00 48,400.00
Paku 0.010 Kg 34,100.00 341.00
Tenaga
Perkerja 0.030 Oh 27,500.00 825
Tukang Kayu 0.070 Oh 38,500.00 2,695
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.0015 Oh 55,000.00 83

1 m² Langit - langit Asbes ( 1.00 x 1.00 )m tebal 4 mm 42,691.00 3,910.50 46,601.50


Bahan
Pelat Asbes tebal 4 mm 1.100 lbr 38,500.00 42,350.00
Paku 0.010 Kg 34,100.00 341.00
Tenaga
Perkerja 0.030 Oh 27,500.00 825
Tukang Kayu 0.070 Oh 38,500.00 2,695
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.0015 Oh 55,000.00 83

1 m² Langit - langit Asbes ( 1.00 x 1.00 )m tebal 3.5 mm 42,691.00 3,910.50 46,601.50
Bahan
Pelat Asbes tebal 4 mm 1.100 lbr 38,500.00 42,350.00
Paku 0.010 Kg 34,100.00 341.00
Tenaga
Perkerja 0.030 Oh 27,500.00 825
Tukang Kayu 0.070 Oh 38,500.00 2,695
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.0015 Oh 55,000.00 83

1 m² Langit - langit Akustik ( 30 x 30 )cm 570,955.00 6,963.00 577,918.00


Bahan
Akustik 30 x 30 cm 11.500 lbr 49,500.00 569,250.00
Paku 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.060 Oh 27,500.00 1,650
Tukang Kayu 0.120 Oh 38,500.00 4,620
Kepala Tukang 0.012 Oh 44,000.00 528
Mandor 0.0030 Oh 55,000.00 165

1 m² Langit - langit Akustik ( 30 x 60 )cm 314,325.00 6,105.00 320,430.00


Bahan
Akustik 30 x 60 cm 5.800 lbr 53,900.00 312,620.00
Paku 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.060 Oh 27,500.00 1,650
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0030 Oh 55,000.00 165

1 m² Langit - langit Akustik ( 60 x 120 )cm 100,705.00 6,105.00 106,810.00


Bahan
Akustik Arm Strong Ukuran 30 x 120 cm 1.500 lbr 66,000.00 99,000.00
Paku 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.060 Oh 27,500.00 1,650
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0030 Oh 55,000.00 165

1 m² Langit - langit Plywood ( 30 x 60 )cm, tebal 4 mm 16,467.00 6,407.50 22,874.50


Bahan
Plywood 4 mm 0.360 lbr 42,900.00 15,444.00
Paku 0.030 Kg 34,100.00 1,023.00
Tenaga
Perkerja 0.070 Oh 27,500.00 1,925
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0035 Oh 55,000.00 193

1 m² Langit - langit Plywood ( 30 x 60 )cm, tebal 6 mm 16,467.00 6,407.50 22,874.50


Bahan
Plywood 4 mm 0.360 lbr 42,900.00 15,444.00
Paku 0.030 Kg 34,100.00 1,023.00
Tenaga
Perkerja 0.070 Oh 27,500.00 1,925
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0035 Oh 55,000.00 193

1 m² Langit - langit Plywood ( 60 x 120 )cm, tebal 4 mm 16,467.00 6,407.50 22,874.50


Bahan
Plywood 4 mm 0.360 lbr 42,900.00 15,444.00
Paku 0.030 Kg 34,100.00 1,023.00
Tenaga
Perkerja 0.070 Oh 27,500.00 1,925
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0035 Oh 55,000.00 193

1 m² Langit - langit Plywood ( 60 x 120 )cm, tebal 6 mm 16,637.50 6,407.50 23,045.00


Bahan
Plywood 4 mm 0.360 lbr 42,900.00 15,444.00
Paku 0.035 Kg 34,100.00 1,193.50
Tenaga
Perkerja 0.070 Oh 27,500.00 1,925
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0035 Oh 55,000.00 193

1 m² Langit - langit Teakwood ( 30 x 60 )cm, tebal 4 mm 30,723.00 6,407.50 37,130.50


Bahan
Teakwood 4' x 8' x 4mm 0.360 lbr 82,500.00 29,700.00
Paku 0.030 Kg 34,100.00 1,023.00
Tenaga
Perkerja 0.070 Oh 27,500.00 1,925
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0035 Oh 55,000.00 193

1 m² Langit - langit Teakwood ( 60 x 120 )cm, tebal 4 mm 30,723.00 6,407.50 37,130.50


Bahan
Teakwood 4' x 8' x 4mm 0.360 lbr 82,500.00 29,700.00
Paku 0.030 Kg 34,100.00 1,023.00
Tenaga
Perkerja 0.070 Oh 27,500.00 1,925
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0035 Oh 55,000.00 193

1 m² Langit - langit Gypsum 28,023.00 6,407.50 34,430.50


Bahan
Gypsum 0.360 lbr 75,000.00 27,000.00
Paku 0.030 Kg 34,100.00 1,023.00
Tenaga
Perkerja 0.070 Oh 27,500.00 1,925
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0035 Oh 55,000.00 193

1 m² Langit - langit Kayu Jati 662,046.00 31,790.00 693,836.00


Bahan
Papan Kayu Jati 0.024 m3 27,500,000.00 660,000.00
Paku 0.010 Kg 34,100.00 341.00
Paku Sekrup 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Kayu 0.600 Oh 38,500.00 23,100
Kepala Tukang 0.060 Oh 44,000.00 2,640
Mandor 0.0100 Oh 55,000.00 550

1 m² Langit - langit Kayu Ramin 3,804.24 31,790.00 35,594.24


Bahan
Papan Kayu Ramin 0.024 lbr 73,260.00 1,758.24
Paku 0.010 Kg 34,100.00 341.00
Paku Sekrup 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Kayu 0.600 Oh 38,500.00 23,100
Kepala Tukang 0.060 Oh 44,000.00 2,640
Mandor 0.0100 Oh 55,000.00 550

1 m² Langit - langit Kayu Kamper 50,886.00 31,790.00 82,676.00


Bahan
Papan Kayu Kamper 0.024 lbr 2,035,000.00 48,840.00
Paku 0.010 Kg 34,100.00 341.00
Paku Sekrup 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Kayu 0.600 Oh 38,500.00 23,100
Kepala Tukang 0.060 Oh 44,000.00 2,640
Mandor 0.0100 Oh 55,000.00 550

1 m² Langit - langit Softboard 33,748.00 20,955.00 54,703.00


Bahan
Softboard 4' x 8' x 4mm 0.350 lbr 93,500.00 32,725.00
Paku 0.030 Kg 34,100.00 1,023.00
Tenaga
Perkerja 0.600 Oh 27,500.00 16,500
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0030 Oh 55,000.00 165

1 m² Langit - langit Akustik 60 x 120 cm + rangka Alluminium 379,885.00 25,987.50 405,872.50


Bahan
Profil Alluminium " T " 3.600 m' 71,500.00 257,400.00
Kawat seng polos 0.150 Kg 20,900.00 3,135.00
Ramset / Dinabolt 1.000 bh 12,100.00 12,100.00
Akustik Armstrom 60 x 120cm 1.500 lbr 71,500.00 107,250.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.500 Oh 38,500.00 19,250
Kepala Tukang 0.050 Oh 44,000.00 2,200
Mandor 0.0075 Oh 55,000.00 413

1 m² List Langit - langit Kayu Profil 16,071.00 3,685.00 19,756.00


Bahan
List Kayu Profil 1.100 m' 14,300.00 15,730.00
Paku 0.010 Kg 34,100.00 341.00
Tenaga
Perkerja 0.050 Oh 27,500.00 1,375
Tukang Kayu 0.050 Oh 38,500.00 1,925
Kepala Tukang 0.005 Oh 44,000.00 220
Mandor 0.0030 Oh 55,000.00 165

1 m² Langit - langit Plywood 4 mm + RangkaKayu Borneo 55,577.00 25,327.50 80,904.50


Bahan
Balok Kayu Borneo 0.023 m3 1,600,000.00 36,800.00
Paku 0.060 Kg 34,100.00 2,046.00
Plywood 4 mm 0.390 lbr 42,900.00 16,731.00
Tenaga
Perkerja 0.270 Oh 27,500.00 7,425
Tukang Kayu 0.400 Oh 38,500.00 15,400
Kepala Tukang 0.040 Oh 44,000.00 1,760
Mandor 0.0135 Oh 55,000.00 743

1 m² Langit - langit Asbes ( 1.00 x 1.00 )m, tebal 3.2mm Rangka Borneo 43,026.00 19,173.00 62,199.00
Bahan
Balok Kayu Borneo 0.012 m3 1,600,000.00 19,200.00
Paku 0.060 Kg 34,100.00 2,046.00
Asbes 1.100 lbr 19,800.00 21,780.00
Tenaga
Perkerja 0.180 Oh 27,500.00 4,950
Tukang Kayu 0.320 Oh 38,500.00 12,320
Kepala Tukang 0.032 Oh 44,000.00 1,408
Mandor 0.0090 Oh 55,000.00 495

1 m² Langit - langit Akustik ( 30 x 60 )cm + Rangka Kayu Borneo 351,466.00 25,025.00 376,491.00
Bahan
Balok Kayu Borneo 0.023 m3 1,600,000.00 36,800.00
Paku 0.060 Kg 34,100.00 2,046.00
Akustik 30 x 60 cm 5.800 lbr 53,900.00 312,620.00
Tenaga
Perkerja 0.260 Oh 27,500.00 7,150
Tukang Kayu 0.400 Oh 38,500.00 15,400
Kepala Tukang 0.040 Oh 44,000.00 1,760
Mandor 0.0130 Oh 55,000.00 715

1 m² Langit - langit Akustik ( 30 x 30 )cm + Rangka Kayu Borneo 614,496.00 29,540.50 644,036.50
Bahan
Balok Kayu Borneo 0.027 m3 1,600,000.00 43,200.00
Paku 0.060 Kg 34,100.00 2,046.00
Akustik 30 x 30 cm 11.500 lbr 49,500.00 569,250.00
Tenaga
Perkerja 0.310 Oh 27,500.00 8,525
Tukang Kayu 0.470 Oh 38,500.00 18,095
Kepala Tukang 0.047 Oh 44,000.00 2,068
Mandor 0.0155 Oh 55,000.00 853

IX PEKERJAAN SANITASI
Memasang 1 buah Kloset Duduk / Monoblok 1,859,000.00 138,919.00 1,997,919.00
Bahan
Kloset Duduk / Monoblok 1.000 bh 1,430,000.00 1,430,000.00
Perlengkapan 30% Dari bahan 429,000.00 429,000.00
Tenaga
Perkerja 3.300 Oh 27,500.00 90,750
Tukang Batu 1.100 Oh 35,750.00 39,325
Kepala Tukang 0.001 Oh 44,000.00 44
Mandor 0.1600 Oh 55,000.00 8,800
Memasang 1 buah Kloset Jongkok Porselen 173,750.00 155,925.00 329,675.00
Bahan
Kloset Jongkok Porselen 1.000 bh 165,000.00 165,000.00
Semen Portland 6.000 Kg 1,100.00 6,600.00
Pasir Pasang 0.010 m3 215,000.00 2,150.00
Tenaga
Perkerja 1.000 Oh 27,500.00 27,500
Tukang Batu 1.500 Oh 35,750.00 53,625
Kepala Tukang 1.500 Oh 44,000.00 66,000
Mandor 0.1600 Oh 55,000.00 8,800

Memasang 1 buah Kloset Jongkok Teraso 117,485.00 100,375.00 217,860.00


Bahan
Kloset Jongkok Teraso 1.000 bh 104,500.00 104,500.00
Bata merah kelas I 7.000 bh 605.00 4,235.00
Semen Portland 6.000 Kg 1,100.00 6,600.00
Pasir Pasang 0.010 m3 215,000.00 2,150.00
Tenaga
Perkerja 1.000 Oh 27,500.00 27,500
Tukang Batu 1.500 Oh 35,750.00 53,625
Kepala Tukang 0.300 Oh 44,000.00 13,200
Mandor 0.1100 Oh 55,000.00 6,050

Memasang 1 buah Urinoir 652,250.00 73,150.00 725,400.00


Bahan
Urinoir 1.000 bh 495,000.00 495,000.00
Perlengkapan 30% Harga Urinoir 148,500.00 148,500.00
Semen Portland 6.000 Kg 1,100.00 6,600.00
Pasir Pasang 0.010 m3 215,000.00 2,150.00
Tenaga
Perkerja 1.000 Oh 27,500.00 27,500
Tukang Batu 1.000 Oh 35,750.00 35,750
Kepala Tukang 0.100 Oh 44,000.00 4,400
Mandor 0.1000 Oh 55,000.00 5,500

Memasang 1 buah Wastafel 563,150.00 91,437.50 654,587.50


Bahan
Urinoir 1.000 bh 495,000.00 495,000.00
Perlengkapan 12% Harga Urinoir 59,400.00 59,400.00
Semen Abu -abu 6.000 Kg 1,100.00 6,600.00
Pasir Pasang 0.010 m3 215,000.00 2,150.00
Tenaga
Perkerja 1.000 Oh 27,500.00 27,500
Tukang Batu 1.450 Oh 35,750.00 51,838
Kepala Tukang 0.150 Oh 44,000.00 6,600
Mandor 0.1000 Oh 55,000.00 5,500

Memasang 1 buah Bak Mandi Teraso, volume 0.30 m³ 140,750.00 93,692.50 234,442.50
Bahan
Bak Teraso 1.000 bh 132,000.00 132,000.00
Semen Portland 6.000 Kg 1,100.00 6,600.00
Pasir Pasang 0.010 m3 215,000.00 2,150.00
Tenaga
Perkerja 2.100 Oh 27,500.00 57,750
Tukang Batu 0.750 Oh 35,750.00 26,813
Kepala Tukang 0.070 Oh 44,000.00 3,080
Mandor 0.1100 Oh 55,000.00 6,050

Memasang 1 buah Bak Mandi Fiberglass, volume 0.30 m³ 233,640.00 175,835.00 409,475.00
Bahan
Bak Fiberglass 1.000 bh 198,000.00 198,000.00
Perlengkapan 18% Harga Bak 35,640.00 35,640.00
Tenaga
Perkerja 1.800 Oh 27,500.00 49,500
Tukang Batu 2.700 Oh 35,750.00 96,525
Kepala Tukang 0.540 Oh 44,000.00 23,760
Mandor 0.1100 Oh 55,000.00 6,050

Memasang 1 buah Bak Mandi Batu bata, volume 0.30 m³ 420,284.00 301,950.00 722,234.00
Bahan
Bata merah kelas I 0.400 m3 605.00 242.00
Semen Portland 120.000 Kg 1,100.00 132,000.00
Pasir Pasang 0.300 m3 215,000.00 64,500.00
Porselen ( 11 x 11 ) cm 360.000 bh 598.95 215,622.00
Semen Nat 6.000 Kg 1,320.00 7,920.00
Tenaga
Perkerja 6.000 Oh 27,500.00 165,000
Tukang Batu 3.000 Oh 35,750.00 107,250
Kepala Tukang 0.300 Oh 44,000.00 13,200
Mandor 0.3000 Oh 55,000.00 16,500

Memasang 1 buah Badkip Porselen 858,000.00 #VALUE! #VALUE!


Bahan
Badkip 1.000 bh 715,000.00 715,000.00
Perlengkapan 20% harga Badkip 143,000.00 143,000.00
Tenaga
Perkerja - Oh 27,500.00 #VALUE!
Tukang Batu 0.075 Oh 35,750.00 2,681
Kepala Tukang 0.750 Oh 44,000.00 33,000
Mandor 0.2500 Oh 55,000.00 13,750

Memasang 1 buah Bak Fiberglass volume 1 m³ air 221,760.00 332,475.00 554,235.00


Bahan
Bak Fiberglass 1.000 bh 198,000.00 198,000.00
Perlengkapan 12% Harga Bak 23,760.00
Tenaga
Perkerja 3.000 Oh 27,500.00 82,500
Tukang Batu 4.500 Oh 35,750.00 160,875
Kepala Tukang 0.900 Oh 44,000.00 39,600
Mandor 0.9000 Oh 55,000.00 49,500

Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa Tanah Ø15 cm 154,111.00 2,992.00 157,103.00
Bahan
Pipa Tanah 1.600 bh 93,500.00 149,600.00
Semen Portland 0.680 Kg 1,100.00 748.00
Pasir Pasang 0.013 m3 215,000.00 2,795.00
Pasir Urug 0.011 m3 88,000.00 968.00
Tenaga
Perkerja 0.060 Oh 27,500.00 1,650
Tukang Batu 0.030 Oh 35,750.00 1,073
Kepala Tukang 0.003 Oh 44,000.00 132
Mandor 0.0025 Oh 55,000.00 138

Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa Tanah Ø 20 cm 154,799.00 4,191.00 158,990.00
Bahan
Pipa Tanah 1.600 bh 93,500.00 149,600.00
Semen Portland 0.870 Kg 1,100.00 957.00
Pasir Pasang 0.014 m3 215,000.00 3,010.00
Pasir Urug 0.014 m3 88,000.00 1,232.00
Tenaga
Perkerja 0.080 Oh 27,500.00 2,200
Tukang Batu 0.040 Oh 35,750.00 1,430
Kepala Tukang 0.004 Oh 44,000.00 176
Mandor 0.0070 Oh 55,000.00 385

Memasang 1 m' Pipa Beton Ø 5 cm - 20 cm 115,427.35 7,045.50 122,472.85


Bahan
Pipa Beton 1.100 bh 88,000.00 96,800.00
Bata merah kelas I 0.270 m3 605.00 163.35
Semen Portland 3.920 Kg 1,100.00 4,312.00
Pasir Pasang 0.056 m3 215,000.00 12,040.00
Pasir Urug 0.024 m3 88,000.00 2,112.00
Tenaga
Perkerja 0.140 Oh 27,500.00 3,850
Tukang Batu 0.070 Oh 35,750.00 2,503
Kepala Tukang 0.007 Oh 44,000.00 308
Mandor 0.0070 Oh 55,000.00 385

Memasang 1 m' Pipa Beton Ø 30 cm - 100 cm 127,649.75 19,123.50 146,773.25


Bahan
Pipa Beton 1.100 bh 88,000.00 96,800.00
Bata merah kelas I 0.550 m3 605.00 332.75
Semen Portland 10.300 Kg 1,100.00 11,330.00
Pasir Pasang 0.061 m3 215,000.00 13,115.00
Pasir Urug 0.069 m3 88,000.00 6,072.00
Tenaga
Perkerja 0.380 Oh 27,500.00 10,450
Tukang Batu 0.190 Oh 35,750.00 6,793
Kepala Tukang 0.019 Oh 44,000.00 836
Mandor 0.0190 Oh 55,000.00 1,045

Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t = 35cm 121,287.73 125,232.25 246,519.98
Bahan
Bata merah kelas I 0.145 m3 605.00 87.73
Semen Portland 44.000 Kg 1,100.00 48,400.00
Pasir Pasang 0.070 m3 215,000.00 15,050.00
Batu Kerikil 0.070 m3 275,000.00 19,250.00
Besi Beton 1.600 Kg 16,000.00 25,600.00
Pasir Beton 0.060 m3 215,000.00 12,900.00
Tenaga
Perkerja 3.200 Oh 27,500.00 88,000
Tukang Batu 1.015 Oh 35,750.00 36,286
Kepala Tukang 0.0015 Oh 44,000.00 66
Mandor 0.0160 Oh 55,000.00 880

Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50cm 179,251.25 61,932.75 241,184.00
Bahan
Bata merah kelas I 0.250 m3 605.00 151.25
Semen Portland 77.000 Kg 1,100.00 84,700.00
Pasir Pasang 0.130 m3 215,000.00 27,950.00
Batu Kerikil 0.020 m3 275,000.00 5,500.00
Besi Beton 2.600 Kg 16,000.00 41,600.00
Pasir Beton 0.090 m3 215,000.00 19,350.00
Tenaga
Perkerja 1.420 Oh 27,500.00 39,050
Tukang Batu 0.473 Oh 35,750.00 16,910
Kepala Tukang 0.0470 Oh 44,000.00 2,068
Mandor 0.0710 Oh 55,000.00 3,905

Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (60 x 60 )cm, t = 65cm 277,659.46 97,548.00 375,207.46
Bahan
Bata merah kelas I 0.371 m3 605.00 224.46
Semen Portland 114.000 Kg 1,100.00 125,400.00
Pasir Pasang 0.184 m3 215,000.00 39,560.00
Batu Koral 0.033 m3 275,000.00 9,075.00
Besi Beton 4.850 Kg 16,000.00 77,600.00
Pasir Beton 0.120 m3 215,000.00 25,800.00
Tenaga
Perkerja 2.160 Oh 27,500.00 59,400
Tukang Batu 0.720 Oh 35,750.00 25,740
Kepala Tukang 0.0720 Oh 44,000.00 3,168
Mandor 0.1080 Oh 55,000.00 5,940
Tukang Gali 0.1000 Oh 33,000.00 3,300

Memasang 1 m' Pipa Galvanis Ø ½" 201,500.00 6,583.50 208,083.50


Bahan
Pipa Galvanis 1.200 m' 130,000.00 156,000.00
Perlengkapan 35% Harga Pipa 45,500.00 45,500.00
Tenaga
Perkerja 0.054 Oh 27,500.00 1,485
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0270 Oh 55,000.00 1,485

Memasang 1 m' Pipa Galvanis Ø ¾" 201,500.00 6,583.50 208,083.50


Bahan
Pipa Galvanis 1.200 m' 130,000.00 156,000.00
Perlengkapan 35% Harga Pipa 45,500.00 45,500.00
Tenaga
Perkerja 0.054 Oh 27,500.00 1,485
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0270 Oh 55,000.00 1,485

Memasang 1 m' Pipa Galvanis Ø 1" 201,500.00 6,583.50 208,083.50


Bahan
Pipa Galvanis 1.200 m' 130,000.00 156,000.00
Perlengkapan 35% Harga Pipa 45,500.00 45,500.00
Tenaga
Perkerja 0.054 Oh 27,500.00 1,485
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0270 Oh 55,000.00 1,485

Memasang 1 m' Pipa Galvanis Ø 1½" 201,500.00 10,494.00 211,994.00


Bahan
Pipa Galvanis 1.200 m' 130,000.00 156,000.00
Perlengkapan 35% Harga Pipa 45,500.00 45,500.00
Tenaga
Perkerja 0.108 Oh 27,500.00 2,970
Tukang Batu 0.180 Oh 35,750.00 6,435
Kepala Tukang 0.0180 Oh 44,000.00 792
Mandor 0.0054 Oh 55,000.00 297

Memasang 1 m' Pipa Galvanis Ø 3" #VALUE! 10,494.00 #VALUE!


Bahan
Pipa Galvanis 1.200 m' 130,000.00 156,000.00
Perlengkapan 35% Harga Pipa 45,500.00 #VALUE!
Tenaga
Perkerja 0.108 Oh 27,500.00 2,970
Tukang Batu 0.180 Oh 35,750.00 6,435
Kepala Tukang 0.0180 Oh 44,000.00 792
Mandor 0.0054 Oh 55,000.00 297

Memasang 1 m' Pipa Galvanis Ø 4" 28,416.67 13,120.25 41,536.92


Bahan
Pipa Galvanis D 4" 1.200 m' 18,333.33 22,000.00
Perlengkapan 35% Harga Pipa 6,416.67 6,416.67
Tenaga
Perkerja 0.135 Oh 27,500.00 3,713
Tukang Batu 0.225 Oh 35,750.00 8,044
Kepala Tukang 0.0225 Oh 44,000.00 990
Mandor 0.0068 Oh 55,000.00 374

Memasang 1 m' Pipa PVC tipe AW Ø ½" 3,912.98 3,498.00 7,410.98


Bahan
Pipa PVC D 1/2" 1.200 m' 2,524.50 3,029.40
Perlengkapan 35% Harga Pipa 883.58 883.58
Tenaga
Perkerja 0.036 Oh 27,500.00 990
Tukang Batu 0.060 Oh 35,750.00 2,145
Kepala Tukang 0.0060 Oh 44,000.00 264
Mandor 0.0018 Oh 55,000.00 99

Memasang 1 m' Pipa PVC tipe AW Ø ¾" 6,146.53 3,498.00 9,644.53


Bahan
Pipa PVC tipe AW Ø ¾" 1.200 m' 3,965.50 4,758.60
Perlengkapan 35% Harga Pipa 1,387.93 1,387.93
Tenaga
Perkerja 0.036 Oh 27,500.00 990
Tukang Batu 0.060 Oh 35,750.00 2,145
Kepala Tukang 0.0060 Oh 44,000.00 264
Mandor 0.0018 Oh 55,000.00 99

Memasang 1 m' Pipa PVC tipe AW Ø 1" 8,439.75 3,498.00 11,937.75


Bahan
Pipa PVC tipe AW Ø 1" 1.200 m' 5,445.00 6,534.00
Perlengkapan 35% Harga Pipa 1,905.75 1,905.75
Tenaga
Perkerja 0.036 Oh 27,500.00 990
Tukang Batu 0.060 Oh 35,750.00 2,145
Kepala Tukang 0.0060 Oh 44,000.00 264
Mandor 0.0018 Oh 55,000.00 99

Memasang 1 m' Pipa PVC tipe AW Ø 1½" 28,626.95 3,498.00 32,124.95


Bahan
Pipa PVC tipe AW Ø 1½" 1.200 m' 18,469.00 22,162.80
Perlengkapan 35% Harga Pipa 6,464.15 6,464.15
Tenaga
Perkerja 0.036 Oh 27,500.00 990
Tukang Batu 0.060 Oh 35,750.00 2,145
Kepala Tukang 0.0060 Oh 44,000.00 264
Mandor 0.0018 Oh 55,000.00 99

Memasang 1 m' Pipa PVC tipe AW Ø 2" 31,073.63 5,247.00 36,320.63


Bahan
Pipa PVC tipe AW Ø 2" 1.200 m' 20,047.50 24,057.00
Perlengkapan 35% Harga Pipa 7,016.63 7,016.63
Tenaga
Perkerja 0.054 Oh 27,500.00 1,485
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0027 Oh 55,000.00 149

Memasang 1 m' Pipa PVC tipe AW Ø 2½" 51,150.00 3,498.00 54,648.00


Bahan
Pipa PVC tipe AW Ø 2½" 1.200 m' 33,000.00 39,600.00
Perlengkapan 35% Harga Pipa 11,550.00 11,550.00
Tenaga
Perkerja 0.036 Oh 27,500.00 990
Tukang Batu 0.060 Oh 35,750.00 2,145
Kepala Tukang 0.0060 Oh 44,000.00 264
Mandor 0.0018 Oh 55,000.00 99

Memasang 1 m' Pipa PVC tipe AW Ø 3" 61,763.63 7,873.25 69,636.88


Bahan
Pipa PVC tipe AW Ø 3" 1.200 m' 39,847.50 47,817.00
Perlengkapan 35% Harga Pipa 13,946.63 13,946.63
Tenaga
Perkerja 0.081 Oh 27,500.00 2,228
Tukang Batu 0.135 Oh 35,750.00 4,826
Kepala Tukang 0.0135 Oh 44,000.00 594
Mandor 0.0041 Oh 55,000.00 226

Memasang 1 m' Pipa PVC tipe AW Ø 4" 90,365.00 7,873.25 98,238.25


Bahan
Pipa PVC tipe AW Ø 4" 1.200 m' 58,300.00 69,960.00
Perlengkapan 35% Harga Pipa 20,405.00 20,405.00
Tenaga
Perkerja 0.081 Oh 27,500.00 2,228
Tukang Batu 0.135 Oh 35,750.00 4,826
Kepala Tukang 0.0135 Oh 44,000.00 594
Mandor 0.0041 Oh 55,000.00 226

Memasang 1 bh Bak Cuci Piring Stainles Steel 566,500.00 12,952.50 579,452.50


Bahan
Bak cuci Stainless steel 1.000 bh 495,000.00 495,000.00
Water Drain + Asesories 1.000 set 71,500.00 71,500.00
Tenaga
Perkerja 0.030 Oh 27,500.00 825
Tukang Batu 0.300 Oh 35,750.00 10,725
Kepala Tukang 0.0300 Oh 44,000.00 1,320
Mandor 0.0015 Oh 55,000.00 83

Memasang 1 bh Bak Cuci Piring Teraso 489,250.00 21,587.50 510,837.50


Bahan
Bak cuci Teraso 1.000 bh 385,000.00 385,000.00
Water Drain + Asesories 1.000 set 71,500.00 71,500.00
Semen Portland 20.000 Kg 1,100.00 22,000.00
Pasir Pasang 0.050 m3 215,000.00 10,750.00
Tenaga
Perkerja 0.050 Oh 27,500.00 1,375
Tukang Batu 0.500 Oh 35,750.00 17,875
Kepala Tukang 0.0500 Oh 44,000.00 2,200
Mandor 0.0025 Oh 55,000.00 138

Memasang 1 bh Kran Ø ¾" atau ½" 33,123.75 4,565.00 37,688.75


Bahan
Kran Air 1.000 bh 33,000.00 33,000.00
Seal tape 0.025 bh 4,950.00 123.75
Tenaga
Perkerja 0.010 Oh 27,500.00 275
Tukang Batu 0.100 Oh 35,750.00 3,575
Kepala Tukang 0.0100 Oh 44,000.00 440
Mandor 0.0050 Oh 55,000.00 275

Memasang 1 bh Floor Drain 33,000.00 4,565.00 37,565.00


Bahan
Kran Air 1.000 bh 33,000.00 33,000.00
Tenaga
Perkerja 0.010 Oh 27,500.00 275
Tukang Batu 0.100 Oh 35,750.00 3,575
Kepala Tukang 0.0100 Oh 44,000.00 440
Mandor 0.0050 Oh 55,000.00 275

VII PEKERJAAN BESI DAN ALLUMINIUM


1 Kg Pasang Rangka Atap Baja 23,100.00 2,590.50 25,690.50
Bahan
Besi Profil WF 1.100 Kg 19,800.00 21,780.00
Meni Besi 0.080 Kg 16,500.00 1,320.00
Tenaga
Perkerja 0.006 Oh 27,500.00 165
Tukang Besi 0.060 Oh 35,750.00 2,145
Kepala Tukang 0.0060 Oh 44,000.00 264
Mandor 0.0003 Oh 55,000.00 17

1 m² Pasang Pintu Besi Baja 495,000.00 47,520.00 542,520.00


Bahan
Pintu Besi Baja 1.000 m2 495,000.00 495,000.00
Tenaga
Perkerja 0.650 Oh 27,500.00 17,875
Tukang Besi Konstruksi 0.650 Oh 38,500.00 25,025
Kepala Tukang 0.0650 Oh 44,000.00 2,860
Mandor 0.0320 Oh 55,000.00 1,760

1 m² Pasang Jendela Besi 495,000.00 74,208.75 569,208.75


Bahan
Jendela Besi 1.000 m2 495,000.00 495,000.00
Tenaga
Perkerja 1.050 Oh 27,500.00 28,875
Tukang Besi Konstruksi 1.050 Oh 38,500.00 40,425
Kepala Tukang 0.1050 Oh 44,000.00 4,620
Mandor 0.00525 Oh 55,000.00 289

1 m² Pasang Jendela Besi Tahan Api 715,000.00 79,915.00 794,915.00


Bahan
Jendela Besi Tahan Api 1.000 m2 715,000.00 715,000.00
Tenaga
Perkerja 1.022 Oh 27,500.00 28,105
Tukang Besi Konstruksi 1.200 Oh 38,500.00 46,200
Kepala Tukang 0.1200 Oh 44,000.00 5,280
Mandor 0.0060 Oh 55,000.00 330

1 m² Pasang Pintu gulung besi 495,000.00 84,810.00 579,810.00


Bahan
Pintu gulung besi 1.000 m2 495,000.00 495,000.00
Tenaga
Perkerja 1.200 Oh 27,500.00 33,000
Tukang Besi Konstruksi 1.200 Oh 38,500.00 46,200
Kepala Tukang 0.1200 Oh 44,000.00 5,280
Mandor 0.0060 Oh 55,000.00 330

1 m² Pasang Pintu Lipat 715,000.00 74,206.00 789,206.00


Bahan
Pintu Lipat 1.000 m2 715,000.00 715,000.00
Tenaga
Perkerja 1.050 Oh 27,500.00 28,875
Tukang Besi Konstruksi 1.050 Oh 38,500.00 40,425
Kepala Tukang 0.1050 Oh 44,000.00 4,620
Mandor 0.0052 Oh 55,000.00 286

1 m² Pasang Pintu Suncreen Allumunium 385,000.00 36,740.00 421,740.00


Bahan
Suncreen Allumunium 1.000 m2 385,000.00 385,000.00
Tenaga
Perkerja 0.080 Oh 27,500.00 2,200
Tukang Besi Konstruksi 0.800 Oh 38,500.00 30,800
Kepala Tukang 0.080 Oh 44,000.00 3,520
Mandor 0.004 Oh 55,000.00 220

1 m² Pasang Rolling Door 715,000.00 91,531.00 806,531.00


Bahan
Rolling Door 1.000 m2 715,000.00 715,000.00
Tenaga
Perkerja 1.050 Oh 27,500.00 28,875
Tukang Besi Konstruksi 1.500 Oh 38,500.00 57,750
Kepala Tukang 0.105 Oh 44,000.00 4,620
Mandor 0.0052 Oh 55,000.00 286

1 m² Pasang Pintu Allumunium 385,000.00 74,206.00 459,206.00


Bahan
Pintu Allumunium 1.000 m2 385,000.00 385,000.00
Tenaga
Perkerja 1.050 Oh 27,500.00 28,875
Tukang Besi Konstruksi 1.050 Oh 38,500.00 40,425
Kepala Tukang 0.105 Oh 44,000.00 4,620
Mandor 0.0052 Oh 55,000.00 286

1 m² Pasang Venetions Blinds 143,000.00 24,736.25 167,736.25


Bahan
Venetions Blinds 1.000 m2 143,000.00 143,000.00
Tenaga
Perkerja 0.350 Oh 27,500.00 9,625
Tukang Kayu 0.350 Oh 38,500.00 13,475
Kepala Tukang 0.035 Oh 44,000.00 1,540
Mandor 0.00175 Oh 55,000.00 96

1 m² Pasang Vertikals Blinds 143,000.00 24,736.25 167,736.25


Bahan
Venetions Blinds 1.000 m2 143,000.00 143,000.00
Tenaga
Perkerja 0.350 Oh 27,500.00 9,625
Tukang Kayu 0.350 Oh 38,500.00 13,475
Kepala Tukang 0.035 Oh 44,000.00 1,540
Mandor 0.00175 Oh 55,000.00 96

1 m² Pasang Terali Besi 202,400.00 79,761.00 282,161.00


Bahan
Terali Besi 2 x 3 11.500 m' 17,600.00 202,400.00
Tenaga
Perkerja 1.200 Oh 27,500.00 33,000
Tukang Las 1.200 Oh 38,500.00 46,200
Kepala Tukang 0.012 Oh 44,000.00 528
Mandor 0.0006 Oh 55,000.00 33

1 m² Pasang Kawat Harmonika 197,945.00 7,067.50 205,012.50


Bahan
Kawat Harmonika 1.100 m2 176,000.00 193,600.00
Paku Biasa ½" - 1" 0.020 Kg 34,100.00 682.00
Papan Kayu Kamper 0.0018 m3 2,035,000.00 3,663.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0005 Oh 55,000.00 28

1 m² Pasang Kawat Nyamuk 52,745.00 7,067.50 59,812.50


Bahan
Kawat Nyamuk 1.100 m2 44,000.00 48,400.00
Paku Biasa ½" - 1" 0.020 Kg 34,100.00 682.00
Papan Kayu Kamper 0.0018 m3 2,035,000.00 3,663.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0005 Oh 55,000.00 28

1 m² Pasang Kawat Kassa 76,945.00 7,067.50 84,012.50


Bahan
Kawat Kassa 1.100 m2 66,000.00 72,600.00
Paku Biasa ½" - 1" 0.020 Kg 34,100.00 682.00
Papan Kayu Kamper 0.0018 m3 2,035,000.00 3,663.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0005 Oh 55,000.00 28
1 m² Pasang Kawat Burung 46,695.00 7,067.50 53,762.50
Bahan
Kawat Burung 1.100 m2 38,500.00 42,350.00
Paku Biasa ½" - 1" 0.020 Kg 34,100.00 682.00
Papan Kayu Kamper 0.0018 m3 2,035,000.00 3,663.00
Tenaga
Perkerja 0.100 Oh 27,500.00 2,750
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0005 Oh 55,000.00 28

1 m² Pasang Jendela Nako & Tralis 11,860.75 14,135.00 25,995.75


Bahan
Jendela Nako 1.100 m2 9,900.00 10,890.00
Paku Biasa ½" - 1" atau Sekrup 0.020 Kg 34,100.00 682.00
Besi Strip 0.0250 m2 11,550.00 288.75
Tenaga
Perkerja 0.200 Oh 27,500.00 5,500
Tukang Kayu 0.200 Oh 38,500.00 7,700
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.0010 Oh 55,000.00 55

1 m² Pasang Talang Datar , Seng BJLS 28 46,447.50 20,693.75 67,141.25


Bahan
Seng Plat 3" x 6" BJLS 28 0.500 Lbr 38,500.00 19,250.00
Paku Biasa ½" - 1" atau Sekrup 0.015 Kg 34,100.00 511.50
Papan Kayu Borneo 0.0096 m3 2,035,000.00 19,536.00
Flincote / Meni Besi 0.2500 Kg 28,600.00 7,150.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.400 Oh 38,500.00 15,400
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.00125 Oh 55,000.00 69

1 m² Pasang Talang Miring , Seng BJLS 28 67,006.50 17,668.75 84,675.25


Bahan
Seng Plat 3" x 6" BJLS 28 0.500 Lbr 38,500.00 19,250.00
Paku Biasa ½" - 1" atau Sekrup 0.015 Kg 34,100.00 511.50
Papan Kayu Borneo 0.0190 m3 2,035,000.00 38,665.00
Flincote / Meni Besi 0.3000 Kg 28,600.00 8,580.00
Tenaga
Perkerja 0.040 Oh 27,500.00 1,100
Tukang Kayu 0.400 Oh 38,500.00 15,400
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.00125 Oh 55,000.00 69

1 m² Pasang Talang ½ Lingkaran Ø 10 cm, Seng BJLS 28 62,700.00 14,918.75 77,618.75


Bahan
Seng Gelombang 3" x 6" BJLS 28 0.300 Lbr 49,500.00 14,850.00
Paku Biasa ½" - 1" atau Sekrup 0.100 Kg 34,100.00 3,410.00
Papan Kayu Borneo 0.0190 m3 2,035,000.00 38,665.00
Besi Strip 0.5000 Kg 11,550.00 5,775.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.250 Oh 38,500.00 9,625
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.00125 Oh 55,000.00 69

1 m² Pasang Talang ½ Lingkaran Ø 10 cm, Seng BJLS 24 57,750.00 14,918.75 72,668.75


Bahan
Seng Plat 3 x 6 BJLS 24 0.300 Lbr 33,000.00 9,900.00
Paku Biasa ½" - 1" atau Sekrup 0.100 Kg 34,100.00 3,410.00
Papan Kayu Borneo 0.0190 m3 2,035,000.00 38,665.00
Besi Strip 0.5000 Kg 11,550.00 5,775.00
Tenaga
Perkerja 0.150 Oh 27,500.00 4,125
Tukang Kayu 0.250 Oh 38,500.00 9,625
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.00125 Oh 55,000.00 69

VI PEKERJAAN KUNCI DAN KACA


1 Buah Pasang Kunsi Tanam Antik 220,000.00 27,555.00 247,555.00
Bahan
Kunsi Tanam Antik 1.000 Bh 220,000.00 220,000.00
Tenaga
Perkerja 0.060 Oh 27,500.00 1,650
Tukang Kayu 0.600 Oh 38,500.00 23,100
Kepala Tukang 0.060 Oh 44,000.00 2,640
Mandor 0.003 Oh 55,000.00 165

1 Buah Pasang Kunsi Tanam Biasa 99,000.00 20,240.00 119,240.00


Bahan
Kunsi Tanam Biasa 1.000 Bh 99,000.00 99,000.00
Tenaga
Perkerja 0.010 Oh 27,500.00 275
Tukang Kayu 0.500 Oh 38,500.00 19,250
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.005 Oh 55,000.00 275

1 Buah Pasang Kunsi Tanam Kamar Mandi 132,000.00 19,745.00 151,745.00


Bahan
Kunsi Tanam Kamar Mandi 1.000 Bh 132,000.00 132,000.00
Tenaga
Perkerja 0.005 Oh 27,500.00 138
Tukang Kayu 0.500 Oh 38,500.00 19,250
Kepala Tukang 0.005 Oh 44,000.00 220
Mandor 0.0025 Oh 55,000.00 138

1 Buah Pasang Kunsi Silinder 165,000.00 19,621.25 184,621.25


Bahan
Kunsi Silinder 1.000 Bh 165,000.00 165,000.00
Tenaga
Perkerja 0.005 Oh 27,500.00 138
Tukang Kayu 0.500 Oh 38,500.00 19,250
Kepala Tukang 0.005 Oh 44,000.00 220
Mandor 0.00025 Oh 55,000.00 14

1 Buah Pasang Engsel Pintu 30,250.00 6,888.75 37,138.75


Bahan
Engsel Pintu 1.000 Bh 30,250.00 30,250.00
Tenaga
Perkerja 0.015 Oh 27,500.00 413
Tukang Kayu 0.150 Oh 38,500.00 5,775
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.00075 Oh 55,000.00 41

1 Buah Pasang Engsel Jendela Kupu - kupu 27,500.00 4,592.50 32,092.50


Bahan
Engsel Jendela 1.000 Bh 27,500.00 27,500.00
Tenaga
Perkerja 0.010 Oh 27,500.00 275
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.00050 Oh 55,000.00 28

1 Buah Pasang Engsel Angin 33,000.00 9,680.00 42,680.00


Bahan
Engsel Angin 1.000 Bh 33,000.00 33,000.00
Tenaga
Perkerja 0.020 Oh 27,500.00 550
Tukang Kayu 0.200 Oh 38,500.00 7,700
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.01000 Oh 55,000.00 550

1 Buah Pasang Spring Knip 3,850.00 6,888.75 10,738.75


Bahan
Spring Knip 1.000 Bh 3,850.00 3,850.00
Tenaga
Perkerja 0.015 Oh 27,500.00 413
Tukang Kayu 0.150 Oh 38,500.00 5,775
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.00075 Oh 55,000.00 41

1 Buah Pasang Kait angin 38,500.00 6,888.75 45,388.75


Bahan
Kait Angin 1.000 Bh 38,500.00 38,500.00
Tenaga
Perkerja 0.015 Oh 27,500.00 413
Tukang Kayu 0.150 Oh 38,500.00 5,775
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.00075 Oh 55,000.00 41

1 Buah Pasang Door Closer 165,000.00 22,962.50 187,962.50


Bahan
Door Closer 1.000 Bh 165,000.00 165,000.00
Tenaga
Perkerja 0.050 Oh 27,500.00 1,375
Tukang Kayu 0.500 Oh 38,500.00 19,250
Kepala Tukang 0.050 Oh 44,000.00 2,200
Mandor 0.00250 Oh 55,000.00 138

1 Buah Pasang Kunci Selot 22,000.00 9,185.00 31,185.00


Bahan
Kunci Selot 1.000 Bh 22,000.00 22,000.00
Tenaga
Perkerja 0.020 Oh 27,500.00 550
Tukang Kayu 0.200 Oh 38,500.00 7,700
Kepala Tukang 0.020 Oh 44,000.00 880
Mandor 0.001 Oh 55,000.00 55

1 Buah Pasang Pegangan Pintu / Door Holder 231,000.00 22,962.50 253,962.50


Bahan
Door Holder 1.000 Bh 231,000.00 231,000.00
Tenaga
Perkerja 0.050 Oh 27,500.00 1,375
Tukang Kayu 0.500 Oh 38,500.00 19,250
Kepala Tukang 0.050 Oh 44,000.00 2,200
Mandor 0.0025 Oh 55,000.00 138

1 Buah Pasang Door Stop 165,000.00 4,592.50 169,592.50


Bahan
Door Stop 1.000 Bh 165,000.00 165,000.00
Tenaga
Perkerja 0.010 Oh 27,500.00 275
Tukang Kayu 0.100 Oh 38,500.00 3,850
Kepala Tukang 0.010 Oh 44,000.00 440
Mandor 0.0005 Oh 55,000.00 28

1 Buah Pasang Rel Pintu Dorong 275,000.00 27,555.00 302,555.00


Bahan
Rel Pintu Dorong 1.000 Bh 275,000.00 275,000.00
Tenaga
Perkerja 0.060 Oh 27,500.00 1,650
Tukang Kayu 0.600 Oh 38,500.00 23,100
Kepala Tukang 0.060 Oh 44,000.00 2,640
Mandor 0.0030 Oh 55,000.00 165

1 Buah Pasang Kunci Lemari 27,500.00 11,481.25 38,981.25


Bahan
Kunci Lemari 1.000 Bh 27,500.00 27,500.00
Tenaga
Perkerja 0.025 Oh 27,500.00 688
Tukang Kayu 0.250 Oh 38,500.00 9,625
Kepala Tukang 0.025 Oh 44,000.00 1,100
Mandor 0.00125 Oh 55,000.00 69

1 Buah Pasang Kaca tebal 3 mm 78,650.00 6,888.75 85,538.75


Bahan
Kaca Polos 1.100 m2 71,500.00 78,650.00
Tenaga
Perkerja 0.015 Oh 27,500.00 413
Tukang Kayu 0.150 Oh 38,500.00 5,775
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.00075 Oh 55,000.00 41

1 Buah Pasang Kaca tebal 5 mm 78,650.00 6,888.75 85,538.75


Bahan
Kaca Polos 1.100 m2 71,500.00 78,650.00
Tenaga
Perkerja 0.015 Oh 27,500.00 413
Tukang Kayu 0.150 Oh 38,500.00 5,775
Kepala Tukang 0.015 Oh 44,000.00 660
Mandor 0.00075 Oh 55,000.00 41

1 Buah Pasang Kaca tebal 8 mm 78,650.00 7,576.25 86,226.25


Bahan
Kaca Polos 1.100 m2 71,500.00 78,650.00
Tenaga
Perkerja 0.0165 Oh 27,500.00 454
Tukang Kayu 0.165 Oh 38,500.00 6,353
Kepala Tukang 0.0165 Oh 44,000.00 726
Mandor 0.00080 Oh 55,000.00 44

1 Buah Pasang Kaca Buram tebal 12 mm 102,850.00 11,481.25 114,331.25


Bahan
Kaca Buram 1.100 m2 93,500.00 102,850.00
Tenaga
Perkerja 0.0250 Oh 27,500.00 688
Tukang Kayu 0.250 Oh 38,500.00 9,625
Kepala Tukang 0.0250 Oh 44,000.00 1,100
Mandor 0.00125 Oh 55,000.00 69

1 Buah Pasang Kaca Cermin tebal 5 mm 96,800.00 6,888.75 103,688.75


Bahan
Kaca Cermin 1.100 m2 88,000.00 96,800.00
Tenaga
Perkerja 0.0150 Oh 27,500.00 413
Tukang Kayu 0.150 Oh 38,500.00 5,775
Kepala Tukang 0.0150 Oh 44,000.00 660
Mandor 0.00075 Oh 55,000.00 41

1 Buah Pasang Kaca Cermin tebal 6 mm 96,800.00 6,888.75 103,688.75


Bahan
Kaca Cermin 1.100 m2 88,000.00 96,800.00
Tenaga
Perkerja 0.0150 Oh 27,500.00 413
Tukang Kayu 0.150 Oh 38,500.00 5,775
Kepala Tukang 0.0150 Oh 44,000.00 660
Mandor 0.00075 Oh 55,000.00 41

1 Buah Pasang Kaca Cermin tebal 8 mm 96,800.00 7,576.25 104,376.25


Bahan
Kaca Cermin 1.100 m2 88,000.00 96,800.00
Tenaga
Perkerja 0.0165 Oh 27,500.00 454
Tukang Kayu 0.165 Oh 38,500.00 6,353
Kepala Tukang 0.0165 Oh 44,000.00 726
Mandor 0.00080 Oh 55,000.00 44

1 Buah Pasang Kaca Wireglass tebal 5 mm 145,200.00 6,888.75 152,088.75


Bahan
Kaca Wireglass 1.100 m2 132,000.00 145,200.00
Tenaga
Perkerja 0.0150 Oh 27,500.00 413
Tukang Kayu 0.150 Oh 38,500.00 5,775
Kepala Tukang 0.0150 Oh 44,000.00 660
Mandor 0.00075 Oh 55,000.00 41

1 Buah Pasang Kaca Patri tebal 5 mm 423,500.00 6,888.75 430,388.75


Bahan
Kaca Patri 1.100 m2 385,000.00 423,500.00
Tenaga
Perkerja 0.0150 Oh 27,500.00 413
Tukang Kayu 0.150 Oh 38,500.00 5,775
Kepala Tukang 0.0150 Oh 44,000.00 660
Mandor 0.00075 Oh 55,000.00 41

VI PEKERJAAN PENUTUP LANTAI DAN DINDING


1 m² Pasang Lantai Ubin PC Abu - abu ukuran 40 x 40 cm 56,243.30 12,380.50 68,623.80
Bahan
Ubin Abu -abu 40 x40 cm 6.630 bh 6,160.00 40,840.80
Semen Portland 9.800 Kg 1,100.00 10,780.00
Pasir Pasang 0.0215 m3 215,000.00 4,622.50

Tenaga
Perkerja 0.2500 Oh 27,500.00 6,875
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0125 Oh 55,000.00 688

1 m² Pasang Lantai Ubin PC Abu - abu ukuran 30 x 30 cm 56,752.05 12,883.75 69,635.80


Bahan
Ubin Abu -abu 30 x 30 cm 11.870 bh 3,465.00 41,129.55
Semen Portland 10.000 Kg 1,100.00 11,000.00
Pasir Pasang 0.0215 m3 215,000.00 4,622.50

Tenaga
Perkerja 0.2600 Oh 27,500.00 7,150
Tukang Batu 0.125 Oh 35,750.00 4,469
Kepala Tukang 0.0125 Oh 44,000.00 550
Mandor 0.0130 Oh 55,000.00 715
1 m² Pasang Lantai Ubin PC Abu - abu ukuran 20 x 20 cm 55,152.50 13,387.00 68,539.50
Bahan
Ubin Abu -abu 20 x 20 cm 26.500 bh 1,540.00 40,810.00
Semen Portland 10.400 Kg 1,100.00 11,440.00
Pasir Pasang 0.0135 m3 215,000.00 2,902.50

Tenaga
Perkerja 0.2700 Oh 27,500.00 7,425
Tukang Batu 0.130 Oh 35,750.00 4,648
Kepala Tukang 0.0130 Oh 44,000.00 572
Mandor 0.0135 Oh 55,000.00 743

1 m² Pasang Lantai Ubin Warna ukuran 40 x 40 cm 55,949.80 12,380.50 68,330.30


Bahan
Ubin Warna 40 x 40 cm 6.630 bh 6,160.00 40,840.80
Semen Portland 8.160 Kg 1,100.00 8,976.00 0.204
Pasir Pasang 0.0230 m3 215,000.00 4,945.00
Semen Warna 0.9000 Kg 1,320.00 1,188.00

Tenaga
Perkerja 0.2500 Oh 27,500.00 6,875
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0125 Oh 55,000.00 688

1 m² Pasang Lantai Ubin Warna ukuran 30 x 30 cm 56,458.55 12,380.50 68,839.05


Bahan
Ubin Warna 30 x 30 cm 11.870 bh 3,465.00 41,129.55
Semen Portland 8.360 Kg 1,100.00 9,196.00
Pasir Pasang 0.0230 m3 215,000.00 4,945.00
Semen Warna 0.9000 Kg 1,320.00 1,188.00

Tenaga
Perkerja 0.2500 Oh 27,500.00 6,875
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0125 Oh 55,000.00 688

1 m² Pasang Lantai Ubin Warna ukuran 20 x 20 cm 56,579.00 13,387.00 69,966.00


Bahan
Ubin Warna 20 x 20 cm 26.500 bh 1,540.00 40,810.00
Semen Portland 8.760 Kg 1,100.00 9,636.00
Pasir Pasang 0.0230 m3 215,000.00 4,945.00
Semen Warna 0.9000 Kg 1,320.00 1,188.00

Tenaga
Perkerja 0.2700 Oh 27,500.00 7,425
Tukang Batu 0.130 Oh 35,750.00 4,648
Kepala Tukang 0.0130 Oh 44,000.00 572
Mandor 0.0135 Oh 55,000.00 743

1 m² Pasang Lantai Ubin Teraso ukuran 40 x 40 cm 48,490.50 12,380.50 60,871.00


Bahan
Ubin Teraso 40 x 40 cm 6.250 bh 5,280.00 33,000.00
Semen Portland 8.800 Kg 1,100.00 9,680.00
Pasir Pasang 0.0215 m3 215,000.00 4,622.50
Semen Warna 0.9000 Kg 1,320.00 1,188.00

Tenaga
Perkerja 0.2500 Oh 27,500.00 6,875
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0125 Oh 55,000.00 688

1 m² Pasang Lantai Ubin Teraso ukuran 30 x 30 cm 23,209.20 12,883.75 36,092.95


Bahan
Ubin Teraso 30 x 30 cm 1.870 bh 2,970.00 5,553.90
Semen Portland 10.000 Kg 1,100.00 11,000.00
Pasir Pasang 0.0215 m3 215,000.00 4,622.50
Semen Warna 1.5400 Kg 1,320.00 2,032.80

Tenaga
Perkerja 0.2600 Oh 27,500.00 7,150
Tukang Batu 0.125 Oh 35,750.00 4,469
Kepala Tukang 0.0125 Oh 44,000.00 550
Mandor 0.0130 Oh 55,000.00 715

1 m² Pasang Lantai Ubin Granito ukuran 40 x 40 cm 224,464.10 12,402.50 236,866.60


Bahan
Ubin Granito 40 x 40 cm 6.930 bh 29,920.00 207,345.60
Semen Portland 9.800 Kg 1,100.00 10,780.00
Pasir Pasang 0.0215 m3 215,000.00 4,622.50
Semen Warna 1.3000 Kg 1,320.00 1,716.00

Tenaga
Perkerja 0.2500 Oh 27,500.00 6,875
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0125 Oh 44,000.00 550
Mandor 0.0125 Oh 55,000.00 688

1 m² Pasang Lantai Ubin Granito ukuran 30 x 30 cm 217,374.60 12,883.75 230,258.35


Bahan
Ubin Granito 30 x 30 cm 11.870 bh 16,830.00 199,772.10
Semen Portland 10.000 Kg 1,100.00 11,000.00
Pasir Pasang 0.0215 m3 215,000.00 4,622.50
Semen Warna 1.5000 Kg 1,320.00 1,980.00

Tenaga
Perkerja 0.2600 Oh 27,500.00 7,150
Tukang Batu 0.125 Oh 35,750.00 4,469
Kepala Tukang 0.0125 Oh 44,000.00 550
Mandor 0.0130 Oh 55,000.00 715

1 m² Pasang Lantai Ubin Teralux Kerang ukuran 40 x 40 cm 98,518.50 12,380.50 110,899.00


Bahan
Ubin Teralux Kerang 40 x 40 cm 6.250 bh 13,200.00 82,500.00
Semen Portland 8.800 Kg 1,100.00 9,680.00
Pasir Pasang 0.0215 m3 215,000.00 4,622.50
Semen Warna 1.3000 Kg 1,320.00 1,716.00

Tenaga
Perkerja 0.2500 Oh 27,500.00 6,875
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0125 Oh 55,000.00 688

1 m² Pasang Lantai Ubin Teralux Kerang ukuran 30 x 30 cm 104,774.48 12,380.50 117,154.98


Bahan
Ubin Teralux Kerang 30 x 30 cm 11.807 bh 7,425.00 87,666.98
Semen Portland 10.000 Kg 1,100.00 11,000.00
Pasir Pasang 0.0215 m3 215,000.00 4,622.50
Semen Warna 1.1250 Kg 1,320.00 1,485.00

Tenaga
Perkerja 0.2500 Oh 27,500.00 6,875
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0125 Oh 55,000.00 688

1 m² Pasang Lantai Ubin Teralux Marmer ukuran 60 x 60 cm 286,116.00 12,380.50 298,496.50


Bahan
Ubin Teralux Marmer 60 x 60 cm 5.600 bh 47,520.00 266,112.00
Semen Portland 8.190 Kg 1,100.00 9,009.00
Pasir Pasang 0.0450 m3 215,000.00 9,675.00
Semen Warna 1.0000 Kg 1,320.00 1,320.00

Tenaga
Perkerja 0.2500 Oh 27,500.00 6,875
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0125 Oh 55,000.00 688

1 m² Pasang Lantai Ubin Teralux Marmer ukuran 40 x 40 cm 148,018.50 29,326.00 177,344.50


Bahan
Ubin Teralux Marmer 40 x 40 cm 6.250 bh 21,120.00 132,000.00
Semen Portland 8.800 Kg 1,100.00 9,680.00
Pasir Pasang 0.0215 m3 215,000.00 4,622.50
Semen Warna 1.3000 Kg 1,320.00 1,716.00

Tenaga
Perkerja 0.6720 Oh 27,500.00 18,480
Tukang Batu 0.224 Oh 35,750.00 8,008
Kepala Tukang 0.0220 Oh 44,000.00 968
Mandor 0.0340 Oh 55,000.00 1,870

1 m² Pasang Lantai Ubin Teralux Marmer ukuran 30 x 30 cm 158,618.10 34,826.00 193,444.10


Bahan
Ubin Teralux Marmer 30 x 30 cm 11.870 bh 11,880.00 141,015.60
Semen Portland 10.000 Kg 1,100.00 11,000.00
Pasir Pasang 0.0215 m3 215,000.00 4,622.50
Semen Warna 1.5000 Kg 1,320.00 1,980.00

Tenaga
Perkerja 0.7000 Oh 27,500.00 19,250
Tukang Batu 0.340 Oh 35,750.00 12,155
Kepala Tukang 0.0340 Oh 44,000.00 1,496
Mandor 0.0350 Oh 55,000.00 1,925

1 m² Pasang Plint Ubin PC Abu - abu ukuran 15 x 20 cm 8,697.50 3,019.50 11,717.00


Bahan
Plint Ubin PC Abu - abu 15 x 20 cm 5.300 bh 1,155.00 6,121.50
Semen Portland 1.560 Kg 1,100.00 1,716.00
Pasir Pasang 0.0040 m3 215,000.00 860.00

Tenaga
Perkerja 0.0600 Oh 27,500.00 1,650
Tukang Batu 0.030 Oh 35,750.00 1,073
Kepala Tukang 0.0030 Oh 44,000.00 132
Mandor 0.0030 Oh 55,000.00 165

1 m² Pasang Plint Ubin PC Abu - abu ukuran 10 x 30 cm 6,438.15 3,019.50 9,457.65


Bahan
Plint Ubin PC Abu -abu 10 x 30 cm 3.530 bh 1,155.00 4,077.15
Semen Portland 1.560 Kg 1,100.00 1,716.00
Pasir Pasang 0.0030 m3 215,000.00 645.00

Tenaga
Perkerja 0.0600 Oh 27,500.00 1,650
Tukang Batu 0.030 Oh 35,750.00 1,073
Kepala Tukang 0.0030 Oh 44,000.00 132
Mandor 0.0030 Oh 55,000.00 165

1 m² Pasang Plint Ubin PC Abu - abu ukuran 10 x 40 cm 5,859.00 3,019.50 8,878.50


Bahan
Plint Ubin PC Abu - abu 10 x 40 cm 2.650 bh 1,320.00 3,498.00
Semen Portland 1.560 Kg 1,100.00 1,716.00
Pasir Pasang 0.0030 m3 215,000.00 645.00

Tenaga
Perkerja 0.0600 Oh 27,500.00 1,650
Tukang Batu 0.030 Oh 35,750.00 1,073
Kepala Tukang 0.0030 Oh 44,000.00 132
Mandor 0.0030 Oh 55,000.00 165

1 m² Pasang Plint Ubin PC Warna ukuran 10 x 20 cm 6,879.80 3,019.50 9,899.30


Bahan
Plint Ubin PC Warna 10 x 20 cm 5.300 bh 880.00 4,664.00
Semen Portland 1.200 Kg 1,100.00 1,320.00
Pasir Pasang 0.0030 m3 215,000.00 645.00
Semen Warna 0.1900 Kg 1,320.00 250.80

Tenaga
Perkerja 0.0600 Oh 27,500.00 1,650
Tukang Batu 0.030 Oh 35,750.00 1,073
Kepala Tukang 0.0030 Oh 44,000.00 132
Mandor 0.0030 Oh 55,000.00 165

1 m² Pasang Plint Ubin PC Warna ukuran 10 x 30 cm 7,030.60 3,019.50 10,050.10


Bahan
Plint Ubin PC Warna 10 x 30 cm 3.330 bh 1,320.00 4,395.60
Semen Portland 1.650 Kg 1,100.00 1,815.00
Pasir Pasang 0.0032 m3 215,000.00 688.00
Semen Warna 0.1000 Kg 1,320.00 132.00

Tenaga
Perkerja 0.0600 Oh 27,500.00 1,650
Tukang Batu 0.030 Oh 35,750.00 1,073
Kepala Tukang 0.0030 Oh 44,000.00 132
Mandor 0.0030 Oh 55,000.00 165

1 m² Pasang Plint Ubin PC Warna ukuran 10 x 40 cm 6,761.00 4,026.00 10,787.00


Bahan
Plint Ubin PC Warna 10 x 40 cm 2.650 bh 1,760.00 4,664.00
Semen Portland 1.200 Kg 1,100.00 1,320.00
Pasir Pasang 0.0030 m3 215,000.00 645.00
Semen Warna 0.1000 Kg 1,320.00 132.00

Tenaga
Perkerja 0.0800 Oh 27,500.00 2,200
Tukang Batu 0.040 Oh 35,750.00 1,430
Kepala Tukang 0.0040 Oh 44,000.00 176
Mandor 0.0040 Oh 55,000.00 220

1 m² Pasang Plint Ubin Teraso ukuran 10 x 30 cm 6,688.95 4,026.00 10,714.95


Bahan
Plint Ubin Teraso 10 x 30 cm 3.530 bh 1,155.00 4,077.15
Semen Portland 1.560 Kg 1,100.00 1,716.00
Pasir Pasang 0.0030 m3 215,000.00 645.00
Semen Warna 0.1900 Kg 1,320.00 250.80
Tenaga
Perkerja 0.0800 Oh 27,500.00 2,200
Tukang Batu 0.040 Oh 35,750.00 1,430
Kepala Tukang 0.0040 Oh 44,000.00 176
Mandor 0.0040 Oh 55,000.00 220

1 m² Pasang Plint Ubin Teraso ukuran 10 x 40 cm 6,178.00 4,026.00 10,204.00


Bahan
Plint Ubin Teraso 10 x 40 cm 2.650 bh 1,540.00 4,081.00
Semen Portland 1.200 Kg 1,100.00 1,320.00
Pasir Pasang 0.0030 m3 215,000.00 645.00
Semen Warna 0.1000 Kg 1,320.00 132.00

Tenaga
Perkerja 0.0800 Oh 27,500.00 2,200
Tukang Batu 0.040 Oh 35,750.00 1,430
Kepala Tukang 0.0040 Oh 44,000.00 176
Mandor 0.0040 Oh 55,000.00 220

1 m² Pasang Plint Ubin Granito ukuran 10 x 40 cm 21,919.00 3,019.50 24,938.50


Bahan
Plint Ubin Granito 10 x 40 cm 2.650 bh 7,480.00 19,822.00
Semen Portland 1.200 Kg 1,100.00 1,320.00
Pasir Pasang 0.0030 m3 215,000.00 645.00
Semen Warna 0.1000 Kg 1,320.00 132.00

Tenaga
Perkerja 0.0600 Oh 27,500.00 1,650
Tukang Batu 0.030 Oh 35,750.00 1,073
Kepala Tukang 0.0030 Oh 44,000.00 132
Mandor 0.0030 Oh 55,000.00 165

1 m² Pasang Plint Ubin Granito ukuran 10 x 30 cm 21,316.30 28,611.00 49,927.30


Bahan
Plint Ubin Granito 10 x 30 cm 3.330 bh 5,610.00 18,681.30
Semen Portland 1.650 Kg 1,100.00 1,815.00
Pasir Pasang 0.0032 m3 215,000.00 688.00
Semen Warna 0.1000 Kg 1,320.00 132.00

Tenaga
Perkerja 0.9000 Oh 27,500.00 24,750
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248

1 m² Pasang Plint Ubin Teralux Kerang ukuran 10 x 40 cm 10,885.00 28,611.00 39,496.00


Bahan
Plint Ubin Teralux Kerang 10 x 40 cm 2.500 bh 3,300.00 8,250.00
Semen Portland 1.650 Kg 1,100.00 1,815.00
Pasir Pasang 0.0032 m3 215,000.00 688.00
Semen Warna 0.1000 Kg 1,320.00 132.00

Tenaga
Perkerja 0.9000 Oh 27,500.00 24,750
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248

1 m² Pasang Plint Ubin Teralux Kerang ukuran 10 x 30 cm 10,876.75 28,611.00 39,487.75


Bahan
Plint Ubin Teralux Kerang 10 x 30 cm 3.330 bh 2,475.00 8,241.75
Semen Portland 1.650 Kg 1,100.00 1,815.00
Pasir Pasang 0.0032 m3 215,000.00 688.00
Semen Warna 0.1000 Kg 1,320.00 132.00

Tenaga
Perkerja 0.9000 Oh 27,500.00 24,750
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248

1 m² Pasang Plint Ubin Teralux Marmer ukuran 10 x 60 cm 16,099.00 28,611.00 44,710.00


Bahan
Plint Ubin Teralux Marmer 10 x 60 cm 1.700 bh 7,920.00 13,464.00
Semen Portland 1.650 Kg 1,100.00 1,815.00
Pasir Pasang 0.0032 m3 215,000.00 688.00
Semen Warna 0.1000 Kg 1,320.00 132.00

Tenaga
Perkerja 0.9000 Oh 27,500.00 24,750
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248

1 m² Pasang Plint Ubin Teralux Marmer ukuran 10 x 40 cm 15,835.00 28,611.00 44,446.00


Bahan
Plint Ubin Teralux Marmer 10 x 40 cm 2.500 bh 5,280.00 13,200.00
Semen Portland 1.650 Kg 1,100.00 1,815.00
Pasir Pasang 0.0032 m3 215,000.00 688.00
Semen Warna 0.1000 Kg 1,320.00 132.00

Tenaga
Perkerja 0.9000 Oh 27,500.00 24,750
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248

1 m² Pasang Plint Ubin Teralux Marmer ukuran 10 x 30 cm 15,821.80 28,611.00 44,432.80


Bahan
Plint Ubin Teralux Marmer 10 x 30 cm 3.330 bh 3,960.00 13,186.80
Semen Portland 1.650 Kg 1,100.00 1,815.00
Pasir Pasang 0.0032 m3 215,000.00 688.00
Semen Warna 0.1000 Kg 1,320.00 132.00
Tenaga
Perkerja 0.9000 Oh 27,500.00 24,750
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248

1 m² Pasang Teraso Cor ditempat 118.80 28,611.00 28,729.80


Bahan
Bahan Teraso Cor 0.0036 m3 33,000.00 118.80

Tenaga
Perkerja 0.9000 Oh 27,500.00 24,750
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248

1 m² Pasang Teralux Cor ditempat, tebal 3 cm 118.80 28,611.00 28,729.80


Bahan
Bahan Teraso Cor 0.0036 m3 33,000.00 118.80

Tenaga
Perkerja 0.9000 Oh 27,500.00 24,750
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248

1 m² Pasang Ubin Tahan Asam 178,970.20 14,190.00 193,160.20


Bahan
Ubin Tahan Asam 1.0500 m2 143,000.00 150,150.00
Semen Tanam Asam 14.1400 Kg 1,430.00 20,220.20
Pasir Pasang 0.0400 m3 215,000.00 8,600.00

Tenaga
Perkerja 0.2700 Oh 27,500.00 7,425
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.0150 Oh 44,000.00 660
Mandor 0.0135 Oh 55,000.00 743

1 m² Pasang Lantai Keramik Artistik 10 x 20 cm 32,108.00 32,752.50 64,860.50


Bahan
Ubin Keramik Artistik 10 x 20 cm 5.0000 bh 1,716.00 8,580.00
Semen Portland 11.3800 Kg 1,100.00 12,518.00
Pasir Pasang 0.0420 m3 215,000.00 9,030.00
Semen Warna 1.5000 Kg 1,320.00 1,980.00

Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m' Pasang Plint Keramik Artistik ukuran 10 x 20 cm 9,235.00 6,336.00 15,571.00


Bahan
Plint Keramik Artistik 10 x 20 cm 5.000 bh 1,320.00 6,600.00
Semen Portland 1.650 Kg 1,100.00 1,815.00
Pasir Pasang 0.0032 m3 215,000.00 688.00
Semen Warna 0.1000 Kg 1,320.00 132.00

Tenaga
Perkerja 0.0900 Oh 27,500.00 2,475
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248

1 m' Pasang Plint Keramik Artistik ukuran 10 x 10 cm 35,661.40 6,336.00 41,997.40


Bahan
Plint Keramik Artistik 10 x 10 cm 5.000 bh 6,600.00 33,000.00
Semen Portland 1.650 Kg 1,100.00 1,815.00
Pasir Pasang 0.0032 m3 215,000.00 688.00
Semen Warna 0.1200 Kg 1,320.00 158.40

Tenaga
Perkerja 0.0900 Oh 27,500.00 2,475
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248

1 m' Pasang Plint Keramik Artistik ukuran 5 x 20 cm 4,813.60 6,336.00 11,149.60


Bahan
Plint Keramik Artistik 5 x 20 cm 5.000 bh 660.00 3,300.00
Semen Portland 0.850 Kg 1,100.00 935.00
Pasir Pasang 0.0022 m3 215,000.00 473.00
Semen Warna 0.0800 Kg 1,320.00 105.60

Tenaga
Perkerja 0.0900 Oh 27,500.00 2,475
Tukang Batu 0.090 Oh 35,750.00 3,218
Kepala Tukang 0.0090 Oh 44,000.00 396
Mandor 0.0045 Oh 55,000.00 248

1 m' Pasang Plint Vinyl tanpa adukan 15,620.00 5,632.00 21,252.00


Bahan
Lt. Vinyl Karet 30 x 30 kwl I 3.500 bh 2,200.00 7,700.00
Lem Vinyl 0.080 Kg 99,000.00 7,920.00

Tenaga
Perkerja 0.0800 Oh 27,500.00 2,200
Tukang Batu 0.080 Oh 35,750.00 2,860
Kepala Tukang 0.0080 Oh 44,000.00 352
Mandor 0.0040 Oh 55,000.00 220

1 m² Pasang Lantai Keramik 10 x 20 cm 62,028.00 32,752.50 94,780.50


Bahan
Ubin Keramik 10 x 20 cm 50.000 bh 770.00 38,500.00
Semen Portland 11.380 Kg 1,100.00 12,518.00
Pasir Pasang 0.042 m3 215,000.00 9,030.00
Semen Warna 1.500 Kg 1,320.00 1,980.00

Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Lantai Keramik 15 x 15 cm 72,533.00 32,752.50 105,285.50


Bahan
Ubin Keramik 15 x 15 cm 44.000 bh 1,113.75 49,005.00
Semen Portland 11.380 Kg 1,100.00 12,518.00
Pasir Pasang 0.042 m3 215,000.00 9,030.00
Semen Warna 1.500 Kg 1,320.00 1,980.00

Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Lantai Keramik 20 x 20 cm 73,028.00 32,752.50 105,780.50


Bahan
Ubin Keramik 20 x 20 cm 25.000 bh 1,980.00 49,500.00
Semen Portland 11.380 Kg 1,100.00 12,518.00
Pasir Pasang 0.042 m3 215,000.00 9,030.00
Semen Warna 1.500 Kg 1,320.00 1,980.00

Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Lantai Keramik 25 x 25 cm 73,028.00 32,752.50 105,780.50


Bahan
Ubin Keramik 25 x 25 cm 16.000 bh 3,093.75 49,500.00
Semen Portland 11.380 Kg 1,100.00 12,518.00
Pasir Pasang 0.042 m3 215,000.00 9,030.00
Semen Warna 1.500 Kg 1,320.00 1,980.00

Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Lantai Keramik 15 x 20 cm 75,503.00 32,752.50 108,255.50


Bahan
Ubin Keramik 15 x 20 cm 35.000 bh 1,485.00 51,975.00
Semen Portland 11.380 Kg 1,100.00 12,518.00
Pasir Pasang 0.042 m3 215,000.00 9,030.00
Semen Warna 1.500 Kg 1,320.00 1,980.00

Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Lantai Keramik 33 x 33 cm 77,433.50 32,752.50 110,186.00


Bahan
Ubin Keramik 33 x 33 cm 10.000 bh 5,390.55 53,905.50
Semen Portland 11.380 Kg 1,100.00 12,518.00
Pasir Pasang 0.042 m3 215,000.00 9,030.00
Semen Warna 1.500 Kg 1,320.00 1,980.00

Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Lantai Keramik 33 x 33 cm anti slip 89,412.50 32,752.50 122,165.00


Bahan
Ubin Keramik 33 x 33 cm anti slip 10.000 bh 6,588.45 65,884.50
Semen Portland 11.380 Kg 1,100.00 12,518.00
Pasir Pasang 0.042 m3 215,000.00 9,030.00
Semen Warna 1.500 Kg 1,320.00 1,980.00

Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Lantai Keramik 10 x 33 cm 77,433.50 32,752.50 110,186.00


Bahan
Ubin Keramik 10 x 33 cm 33.000 bh 1,633.50 53,905.50
Semen Portland 11.380 Kg 1,100.00 12,518.00
Pasir Pasang 0.042 m3 215,000.00 9,030.00
Semen Warna 1.500 Kg 1,320.00 1,980.00

Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Lantai Mozaik 30 x 30 cm, ex lokal 92,590.00 32,752.50 125,342.50


Bahan
Mozaik 30 x 30 cm 12.000 bh 5,500.00 66,000.00
Semen Portland 14.150 Kg 1,100.00 15,565.00
Pasir Pasang 0.039 m3 215,000.00 8,385.00
Semen Warna 2.000 Kg 1,320.00 2,640.00

Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Lantai Marmer 177,026.00 32,752.50 209,778.50


Bahan
Marmer 1.052 M2 143,000.00 150,436.00
Semen Portland 14.150 Kg 1,100.00 15,565.00
Pasir Pasang 0.039 m3 215,000.00 8,385.00
Semen Warna 2.000 Kg 1,320.00 2,640.00

Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Lantai Karpet 100% Wool 219,450.00 11,968.00 231,418.00


Bahan
Feltex 100% Wool - T - 21 1.050 m2 176,000.00 184,800.00
Lem Vinyl 0.350 Kg 99,000.00 34,650.00

Tenaga
Perkerja 0.1700 Oh 27,500.00 4,675
Tukang Batu 0.170 Oh 35,750.00 6,078
Kepala Tukang 0.0170 Oh 44,000.00 748
Mandor 0.0085 Oh 55,000.00 468

1 m² Pasang Lantai Karpet 100% Wool, 20% Nylon 127,050.00 11,968.00 139,018.00
Bahan
Carpet 80% Wool, 20% Nylon 1.050 m2 88,000.00 92,400.00
Lem Vinyl 0.350 Kg 99,000.00 34,650.00

Tenaga
Perkerja 0.1700 Oh 27,500.00 4,675
Tukang Batu 0.170 Oh 35,750.00 6,078
Kepala Tukang 0.0170 Oh 44,000.00 748
Mandor 0.0085 Oh 55,000.00 468

1 m² Pasang Underlyer, tebal 6 mm 99,330.00 8,448.00 107,778.00


Bahan
Underlyer, tebal 6 mm / Rubber Corrugated 1.050 m2 94,600.00 99,330.00

Tenaga
Perkerja 0.1200 Oh 27,500.00 3,300
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0060 Oh 55,000.00 330

1 m² Pasang Lantai Karpet 63,525.00 11,968.00 75,493.00


Bahan
Carpet 1.050 m2 27,500.00 28,875.00
Lem Vinyl 0.350 Kg 99,000.00 34,650.00

Tenaga
Perkerja 0.1700 Oh 27,500.00 4,675
Tukang Batu 0.170 Oh 35,750.00 6,078
Kepala Tukang 0.0170 Oh 44,000.00 748
Mandor 0.0085 Oh 55,000.00 468

1 m² Pasang Lantai Parquet Jati 244,200.00 33,715.00 277,915.00


Bahan
Parquet Jati 1.050 m2 176,000.00 184,800.00
Lem Vinyl 0.600 Kg 99,000.00 59,400.00

Tenaga
Perkerja 0.6500 Oh 27,500.00 17,875
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0325 Oh 55,000.00 1,788

1 m² Pasang Dinding Porselen 11 x 11 cm, putih 57,165.00 38,775.00 95,940.00


Bahan
Porselen 11 x 11 cm putih 83.000 Bh 495.00 41,085.00
Semen Abu -abu 9.300 Kg 1,100.00 10,230.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Semen Warna 1.500 Kg 1,320.00 1,980.00
Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.500 Oh 35,750.00 17,875
Kepala Tukang 0.0500 Oh 44,000.00 2,200
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Dinding Porselen 11 x 11 cm, warna 66,295.00 38,775.00 105,070.00


Bahan
Porselen 11 x 11 cm warna 83.000 Bh 605.00 50,215.00
Semen Abu -abu 9.300 Kg 1,100.00 10,230.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Semen Warna 1.500 Kg 1,320.00 1,980.00
Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.500 Oh 35,750.00 17,875
Kepala Tukang 0.0500 Oh 44,000.00 2,200
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Dinding Porselen 15 x 15 cm, putih 66,198.75 36,217.50 102,416.25


Bahan
Porselen 15 x 15 cm putih 45.000 Bh 1,113.75 50,118.75
Semen Abu -abu 9.300 Kg 1,100.00 10,230.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Semen Warna 1.500 Kg 1,320.00 1,980.00
Tenaga
Perkerja 0.6000 Oh 27,500.00 16,500
Tukang Batu 0.450 Oh 35,750.00 16,088
Kepala Tukang 0.0450 Oh 44,000.00 1,980
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Dinding Porselen 15 x 15 cm, warna 77,336.25 36,217.50 113,553.75


Bahan
Porselen 15 x 15 cm warna 45.000 Bh 1,361.25 61,256.25
Semen Abu -abu 9.300 Kg 1,100.00 10,230.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Semen Warna 1.500 Kg 1,320.00 1,980.00
Tenaga
Perkerja 0.6000 Oh 27,500.00 16,500
Tukang Batu 0.450 Oh 35,750.00 16,088
Kepala Tukang 0.0450 Oh 44,000.00 1,980
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Dinding Porselen 10 x 20 cm, warna 76,580.00 36,217.50 112,797.50


Bahan
Porselen 10 x 20 cm warna 50.000 Bh 1,210.00 60,500.00
Semen Abu -abu 9.300 Kg 1,100.00 10,230.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Semen Warna 1.500 Kg 1,320.00 1,980.00
Tenaga
Perkerja 0.6000 Oh 27,500.00 16,500
Tukang Batu 0.450 Oh 35,750.00 16,088
Kepala Tukang 0.0450 Oh 44,000.00 1,980
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Dinding Porselen 20 x 20 cm, warna 76,580.00 36,217.50 112,797.50


Bahan
Porselen 20 x 20 cm warna 25.000 Bh 2,420.00 60,500.00
Semen Abu -abu 9.300 Kg 1,100.00 10,230.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Semen Warna 1.500 Kg 1,320.00 1,980.00
Tenaga
Perkerja 0.6000 Oh 27,500.00 16,500
Tukang Batu 0.450 Oh 35,750.00 16,088
Kepala Tukang 0.0450 Oh 44,000.00 1,980
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Dinding Keramik Artistik 10 x 20 cm, warna 786,080.00 36,217.50 822,297.50


Bahan
Keramik Artistik 10 x 20 cm 100.000 Bh 7,700.00 770,000.00
Semen Abu -abu 9.300 Kg 1,100.00 10,230.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Semen Warna 1.500 Kg 1,320.00 1,980.00
Tenaga
Perkerja 0.6000 Oh 27,500.00 16,500
Tukang Batu 0.450 Oh 35,750.00 16,088
Kepala Tukang 0.0450 Oh 44,000.00 1,980
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Dinding Keramik Artistik 5 x 20 cm, warna 731,080.00 36,217.50 767,297.50


Bahan
Keramik Artistik 5 x 20 cm 100.000 Bh 7,150.00 715,000.00
Semen Abu -abu 9.300 Kg 1,100.00 10,230.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Semen Warna 1.500 Kg 1,320.00 1,980.00
Tenaga
Perkerja 0.6000 Oh 27,500.00 16,500
Tukang Batu 0.450 Oh 35,750.00 16,088
Kepala Tukang 0.0450 Oh 44,000.00 1,980
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Dinding Keramik 10 x 20 cm 208,580.00 36,217.50 244,797.50


Bahan
Keramik 10 x 20 cm 50.000 Bh 3,850.00 192,500.00
Semen Abu -abu 9.300 Kg 1,100.00 10,230.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Semen Warna 1.500 Kg 1,320.00 1,980.00
Tenaga
Perkerja 0.6000 Oh 27,500.00 16,500
Tukang Batu 0.450 Oh 35,750.00 16,088
Kepala Tukang 0.0450 Oh 44,000.00 1,980
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Dinding Keramik 15 x 15 cm 189,330.00 36,217.50 225,547.50


Bahan
Keramik 15 x 15 cm 45.000 Bh 3,850.00 173,250.00
Semen Abu -abu 9.300 Kg 1,100.00 10,230.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Semen Warna 1.500 Kg 1,320.00 1,980.00
Tenaga
Perkerja 0.6000 Oh 27,500.00 16,500
Tukang Batu 0.450 Oh 35,750.00 16,088
Kepala Tukang 0.0450 Oh 44,000.00 1,980
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Dinding Keramik 20 x 20 cm 112,330.00 23,705.00 136,035.00


Bahan
Keramik 20 x 20 cm 25.000 Bh 3,850.00 96,250.00
Semen Abu -abu 9.300 Kg 1,100.00 10,230.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Semen Warna 1.500 Kg 1,320.00 1,980.00
Tenaga
Perkerja 0.6000 Oh 27,500.00 16,500
Tukang Batu 0.100 Oh 35,750.00 3,575
Kepala Tukang 0.0450 Oh 44,000.00 1,980
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Dinding Keramik 10 x 20 cm 208,580.00 23,168.75 231,748.75


Bahan
Keramik 10 x 20 cm 50.000 Bh 3,850.00 192,500.00
Semen Abu -abu 9.300 Kg 1,100.00 10,230.00
Pasir Pasang 0.018 m3 215,000.00 3,870.00
Semen Warna 1.500 Kg 1,320.00 1,980.00
Tenaga
Perkerja 0.6000 Oh 27,500.00 16,500
Tukang Batu 0.125 Oh 35,750.00 4,469
Kepala Tukang 0.0125 Oh 44,000.00 550
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Dinding Marmer 166,899.00 47,822.50 214,721.50


Bahan
Marmer 1.020 M2 143,000.00 145,860.00
Semen Abu -abu 12.440 Kg 1,100.00 13,684.00
Pasir Pasang 0.025 m3 215,000.00 5,375.00
Semen Warna 1.500 Kg 1,320.00 1,980.00
Tenaga
Perkerja 0.7200 Oh 27,500.00 19,800
Tukang Batu 0.650 Oh 35,750.00 23,238
Kepala Tukang 0.0650 Oh 44,000.00 2,860
Mandor 0.0350 Oh 55,000.00 1,925

1 m² Pasang Dinding Bata Klinker 5 x 5 x 24 cm 107,059.00 32,752.50 139,811.50


Bahan
Bata Pelapis Klinker 80.000 Bh 1,100.00 88,000.00
Semen Abu -abu 12.440 Kg 1,100.00 13,684.00
Pasir Pasang 0.025 m3 215,000.00 5,375.00
Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Dinding Batu Paros 309,200.00 32,752.50 341,952.50


Bahan
Batu Paros 1.050 Bh 275,000.00 288,750.00
Semen Abu -abu 11.750 Kg 1,100.00 12,925.00
Pasir Pasang 0.035 m3 215,000.00 7,525.00
Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Dinding Batu Tempel Hitam 112,850.00 32,752.50 145,602.50


Bahan
Batu Tempel Hitam 1.050 Bh 88,000.00 92,400.00
Semen Abu -abu 11.750 Kg 1,100.00 12,925.00
Pasir Pasang 0.035 m3 215,000.00 7,525.00
Tenaga
Perkerja 0.6200 Oh 27,500.00 17,050
Tukang Batu 0.350 Oh 35,750.00 12,513
Kepala Tukang 0.0350 Oh 44,000.00 1,540
Mandor 0.0300 Oh 55,000.00 1,650

1 m² Pasang Lantai Vinyl Karet 30 x 30 cm KL I 144,045.00 10,560.00 154,605.00


Bahan
Vinyl Karet 30 x 30 cm KL I 11.050 Bh 9,900.00 109,395.00
Lem Vinyl 0.350 Kg 99,000.00 34,650.00
Tenaga
Perkerja 0.1500 Oh 27,500.00 4,125
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.0150 Oh 44,000.00 660
Mandor 0.0075 Oh 55,000.00 413

1 m² Pasang Lantai Vinyl Karet 30 x 30 cm KL II 131,890.00 10,560.00 142,450.00


Bahan
Vinyl Karet 30 x 30 cm KL II 11.050 Bh 8,800.00 97,240.00
Lem Vinyl 0.350 Kg 99,000.00 34,650.00
Tenaga
Perkerja 0.1500 Oh 27,500.00 4,125
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.0150 Oh 44,000.00 660
Mandor 0.0075 Oh 55,000.00 413

1 m² Pasang Lantai Vinyl Asbes 30 x 30 cm 107,580.00 10,560.00 118,140.00


Bahan
Vinyl Asbes 30 x 30 cm 11.050 Bh 6,600.00 72,930.00
Lem Vinyl 0.350 Kg 99,000.00 34,650.00
Tenaga
Perkerja 0.1500 Oh 27,500.00 4,125
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.0150 Oh 44,000.00 660
Mandor 0.0075 Oh 55,000.00 413

1 m² Pasang Lantai Vinyl Motif Kembang 30 x 30 cm 125,812.50 10,560.00 136,372.50


Bahan
Vinyl Motif Kembang ex DN 11.050 Bh 8,250.00 91,162.50
Lem Vinyl 0.350 Kg 99,000.00 34,650.00
Tenaga
Perkerja 0.1500 Oh 27,500.00 4,125
Tukang Batu 0.150 Oh 35,750.00 5,363
Kepala Tukang 0.0150 Oh 44,000.00 660
Mandor 0.0075 Oh 55,000.00 413

1 m² Pasang Wall Covering lebar 50 cm 23,188.00 27,918.00 51,106.00


Bahan
Vinyl Wall Covering lebar 50 cm 1.100 m2 19,580.00 21,538.00
Lem 0.250 Kg 6,600.00 1,650.00
Tenaga
Perkerja 0.7500 Oh 27,500.00 20,625
Tukang Batu 0.170 Oh 35,750.00 6,078
Kepala Tukang 0.0170 Oh 44,000.00 748
Mandor 0.0085 Oh 55,000.00 468

1 m² Floor Hardener Ferrovax 92,400.00 8,448.00 100,848.00


Bahan
Floor Hardener Ferrovax 3.000 Kg 30,800.00 92,400.00
Tenaga
Perkerja 0.1200 Oh 27,500.00 3,300
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0060 Oh 55,000.00 330

1 m² Floor Hardener Mastercron 154,000.00 8,448.00 162,448.00


Bahan
Floor Hardener Ferrovax 5.000 Kg 30,800.00 154,000.00
Tenaga
Perkerja 0.1200 Oh 27,500.00 3,300
Tukang Batu 0.120 Oh 35,750.00 4,290
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0060 Oh 55,000.00 330

1 m² Plint Kayu 2 x 10 cm 67,705.00 8,778.00 76,483.00


Bahan
Papan Kayu Jati 0.002 m3 27,500,000.00 66,000.00
Paku Skrup 3.5" 0.050 Kg 34,100.00 1,705.00
Tenaga
Perkerja 0.1200 Oh 27,500.00 3,300
Tukang Kayu 0.120 Oh 38,500.00 4,620
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0060 Oh 55,000.00 330

VI PEKERJAAN PENGECATAN
1 m² Mengikis / Mengerok Permukaan Cat Tembok Lama 357.50 #VALUE! #VALUE!
Bahan
Soda Api 0.050 Kg 7,150.00 357.50
Tenaga
Perkerja 0.1500 Oh 27,500.00 4,125
Tukang Cat - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.0025 Oh 55,000.00 138

1 m² Mencuci Bidang Permukaan Tembok yang Pernah dicat 192.50 #VALUE! #VALUE!
Bahan
Sabun 0.050 Kg 3,850.00 192.50
Tenaga
Perkerja 0.1500 Oh 27,500.00 4,125
Tukang Cat - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.0025 Oh 55,000.00 138

1 m² Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual 192.50 #VALUE! #VALUE!
Bahan
Sabun 0.050 Kg 3,850.00 192.50
Tenaga
Perkerja 0.1500 Oh 27,500.00 4,125
Tukang Cat - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.0025 Oh 55,000.00 138

1 m² Menyabun Permukaan Tembok Lama 192.50 #VALUE! #VALUE!


Bahan
Sabun 0.050 Kg 3,850.00 192.50
Tenaga
Perkerja 0.1500 Oh 27,500.00 4,125
Tukang Cat - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.0025 Oh 55,000.00 138

1 m² Mengerok Karat atau Cat Lama Permukaan Baja dgn Pancar Pasir ( Sanblasting ) dgn Tingkat Kebersihan Sa 2½. 577,500.00 159,500.00 737,000.00
Bahan
Pasir Silika 40.000 Kg 13,200.00 528,000.00
BBM 10.000 Ltr 4,950.00 49,500.00
Peralatan
Kompresor, Blasting Pot , Selang Dan Nozzle sewa / Hr
Tenaga
Perkerja 1.6000 Oh 27,500.00 44,000
Tukang Cat 1.600 Oh 33,000.00 52,800
Kepala Tukang 0.8000 Oh 44,000.00 35,200
Mandor 0.5000 Oh 55,000.00 27,500

1 m² Mendempul dan Menggosok Kayu 2,464.00 2,733.50 5,197.50


Bahan
Dempul Jadi 0.080 Kg 23,100.00 1,848.00
Minyak Cat 0.020 Kg 27,500.00 550.00
Batu Apung 0.010 Kg 6,600.00 66.00
Tenaga
Perkerja 0.0400 Oh 27,500.00 1,100
Tukang Cat 0.040 Oh 33,000.00 1,320
Kepala Tukang 0.0040 Oh 44,000.00 176
Mandor 0.0025 Oh 55,000.00 138

1 m² Mengecatan Bidang Kayu Lama 7,084.00 4,867.50 11,951.50


Bahan
Plamir 0.150 Kg 19,800.00 2,970.00
Cat Dasar 0.170 Kg 11,000.00 1,870.00
Cat Penutup 0.170 Kg 13,200.00 2,244.00
Tenaga
Perkerja 0.0700 Oh 27,500.00 1,925
Tukang Cat 0.075 Oh 33,000.00 2,475
Kepala Tukang 0.0075 Oh 44,000.00 330
Mandor 0.0025 Oh 55,000.00 138

1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup 15,290.00 2,623.50 17,913.50
Bahan
Cat Meni 0.200 Kg 16,500.00 3,300.00
Plamir 0.150 Kg 19,800.00 2,970.00
Cat Dasar 0.170 Kg 11,000.00 1,870.00
Cat Kayu glotek 0.260 Kg 27,500.00 7,150.00

Tenaga
Perkerja 0.0700 Oh 27,500.00 1,925
Tukang Cat 0.009 Oh 33,000.00 297
Kepala Tukang 0.0060 Oh 44,000.00 264
Mandor 0.0025 Oh 55,000.00 138

1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup 17,765.00 5,703.50 23,468.50
Bahan
Cat Meni 0.200 Kg 16,500.00 3,300.00
Plamir 0.150 Kg 19,800.00 2,970.00
Cat Dasar 0.170 Kg 11,000.00 1,870.00
Cat Kayu glotek 0.350 Kg 27,500.00 9,625.00

Tenaga
Perkerja 0.0700 Oh 27,500.00 1,925
Tukang Cat 0.105 Oh 33,000.00 3,465
Kepala Tukang 0.0040 Oh 44,000.00 176
Mandor 0.0025 Oh 55,000.00 138

1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup 17,765.00 5,703.50 23,468.50
Bahan
Cat Meni 0.200 Kg 16,500.00 3,300.00
Plamir 0.150 Kg 19,800.00 2,970.00
Cat Dasar 0.170 Kg 11,000.00 1,870.00
Cat Kayu glotek 0.350 Kg 27,500.00 9,625.00

Tenaga
Perkerja 0.0700 Oh 27,500.00 1,925
Tukang Cat 0.105 Oh 33,000.00 3,465
Kepala Tukang 0.0040 Oh 44,000.00 176
Mandor 0.0025 Oh 55,000.00 138

1 m² Pelaburan Bidang Kayu dengan Teak Oil 7,920.00 6,088.50 14,008.50


Bahan
Teak Oil 0.360 Ltr 22,000.00 7,920.00
Tenaga
Perkerja 0.0400 Oh 27,500.00 1,100
Tukang Cat 0.063 Oh 33,000.00 2,079
Kepala Tukang 0.0630 Oh 44,000.00 2,772
Mandor 0.0025 Oh 55,000.00 138

1 m² Pelaburan Bidang Kayu dengan Pelitur 49,511.00 6,088.50 55,599.50


Bahan
Pelitur 0.150 Ltr 38,500.00 5,775.00
Pelitur Jadi 0.372 Ltr 88,000.00 32,736.00
Ampelas 2.000 Lbr 5,500.00 11,000.00
Tenaga
Perkerja 0.0400 Oh 27,500.00 1,100
Tukang Cat 0.063 Oh 33,000.00 2,079
Kepala Tukang 0.0630 Oh 44,000.00 2,772
Mandor 0.0025 Oh 55,000.00 138

1 m² Pelaburan Bidang Kayu dengan Cat Residu dan Ter 5,390.00 #VALUE! #VALUE!
Bahan
Residu atau Ter 0.350 Ltr 15,400.00 5,390.00
Tenaga
Perkerja 0.1000 Oh 27,500.00 2,750
Tukang Cat - Oh 33,000.00 #VALUE!
Kepala Tukang - Oh 44,000.00 #VALUE!
Mandor 0.0060 Oh 55,000.00 330

1 m² Pelaburan Bidang Kayu dengan Vernis 6,897.00 10,521.50 17,418.50


Bahan
Vernis 0.150 Ltr 34,100.00 5,115.00
Dempul 0.050 Kg 23,100.00 1,155.00
Ampelas 0.100 Lbr 5,500.00 550.00
Kuas 0.010 Bh 7,700.00 77.00
Tenaga
Perkerja 0.1600 Oh 27,500.00 4,400
Tukang Cat 0.160 Oh 33,000.00 5,280
Kepala Tukang 0.0160 Oh 44,000.00 704
Mandor 0.0025 Oh 55,000.00 138

1 m² Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) 6,512.00 3,043.70 9,555.70
Bahan
Plamir 0.100 Kg 19,800.00 1,980.00
Cat Dasar 0.100 Kg 11,000.00 1,100.00
Cat Tembok vinilex 0.260 Kg 13,200.00 3,432.00
Tenaga
Perkerja 0.0200 Oh 27,500.00 550
Tukang Cat 0.063 Oh 33,000.00 2,079
Kepala Tukang 0.0063 Oh 44,000.00 277
Mandor 0.0025 Oh 55,000.00 138

1 m² Melabur Tembok dengan Kapur Sirih 5,302.00 4,299.90 9,601.90


Bahan
Ampelas 0.100 Lbr 5,500.00 550.00
Alang - alang 0.250 ikat 6,600.00 1,650.00
Perancah Kayu 0.002 m3 1,485,000.00 2,970.00
Kapur Sirih 0.150 Kg 880.00 132.00
Tenaga
Perkerja 0.1500 Oh 27,500.00 4,125
Tukang Cat 0.001 Oh 33,000.00 33
Kepala Tukang 0.0001 Oh 44,000.00 4
Mandor 0.0025 Oh 55,000.00 138
1 m² Melabur Tembok Lama dengan Kapur Sirih ( untuk pemeliharaan ) 3,234.00 1,424.50 4,658.50
Bahan
Perancah Kayu 0.002 m3 1,485,000.00 2,970.00
Kapur Sirih 0.300 Kg 880.00 264.00
Tenaga
Perkerja 0.0400 Oh 27,500.00 1,100
Tukang Cat 0.005 Oh 33,000.00 165
Kepala Tukang 0.0005 Oh 44,000.00 22
Mandor 0.0025 Oh 55,000.00 138

1 m² Pemasangan Wall Paper 47,960.00 7,375.50 55,335.50


Bahan
Wall Paper 1.200 m3 38,500.00 46,200.00
Perekat 0.200 Kg 8,800.00 1,760.00
Tenaga
Perkerja 0.0200 Oh 27,500.00 550
Tukang Cat 0.200 Oh 33,000.00 6,600
Kepala Tukang 0.0020 Oh 44,000.00 88
Mandor 0.0025 Oh 55,000.00 138

1 m² Pengecatan Permukaan Baja dengan Meni Besi 1,727.00 8,580.00 10,307.00


Bahan
Meni Besi 0.100 Kg 16,500.00 1,650.00
Kuas 0.010 Bh 7,700.00 77.00
Tenaga
Perkerja 0.0200 Oh 27,500.00 550
Tukang Cat 0.200 Oh 33,000.00 6,600
Kepala Tukang 0.0200 Oh 44,000.00 880
Mandor 0.0100 Oh 55,000.00 550

1 m² Pengecatan Permukaan Baja dengan Meni Besi dan Perancah 4,697.00 15,702.50 20,399.50
Bahan
Meni Besi 0.100 Kg 16,500.00 1,650.00
Kuas 0.010 Bh 7,700.00 77.00
Perancah Kayu 0.002 m3 1,485,000.00 2,970.00
Tenaga
Perkerja 0.2500 Oh 27,500.00 6,875
Tukang Cat 0.225 Oh 33,000.00 7,425
Kepala Tukang 0.0225 Oh 44,000.00 990
Mandor 0.0075 Oh 55,000.00 413

1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 4 Lapis Cat Konvensional, tebal 200 um 7,524.00 1,765.50 9,289.50
Bahan
Meni ( Read Lead ) A 0.100 Kg 9,900.00 990.00
Meni ( Read Lead ) B 0.100 Kg 12,100.00 1,210.00
Alluminium C 0.040 Kg 27,500.00 1,100.00
Alluminium B 0.040 Kg 29,700.00 1,188.00
Pengencer 0.010 Ltr 6,600.00 66.00
Perancah Kayu 0.002 m3 1,485,000.00 2,970.00
Tenaga
Perkerja 0.0060 Oh 27,500.00 165
Tukang Cat 0.006 Oh 33,000.00 198
Kepala Tukang 0.0225 Oh 44,000.00 990
Mandor 0.0075 Oh 55,000.00 413

1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 1 Lapis Cat Mutakhir, tebal 200 um 4,950.00 3,003.00 7,953.00
Bahan
Meni Besi 0.300 Kg 16,500.00 4,950.00
Tenaga
Perkerja 0.0060 Oh 27,500.00 165
Tukang Cat 0.060 Oh 33,000.00 1,980
Kepala Tukang 0.0120 Oh 44,000.00 528
Mandor 0.0060 Oh 55,000.00 330

1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 3 Lapis Cat Konvensional, tebal 200 um 4,136.00 64,350.00 68,486.00
Bahan
Cat Dasar 0.110 Kg 11,000.00 1,210.00
Cat Antara 0.170 Kg 11,000.00 1,870.00
Cat Penutup 0.080 Kg 13,200.00 1,056.00
Tenaga
Perkerja 0.5000 Oh 27,500.00 13,750
Tukang Cat 0.800 Oh 33,000.00 26,400
Kepala Tukang 0.3000 Oh 44,000.00 13,200
Mandor 0.2000 Oh 55,000.00 11,000

1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Semprot ( Airless Spray ) dgn Sistem 1 Lapis Cat Mutakhir, tebal 200 um 3,300.00 53,900.00 57,200.00
Bahan
Cat Dasar 0.300 Kg 11,000.00 3,300.00
Tenaga
Perkerja 0.4000 Oh 27,500.00 11,000
Tukang Cat 0.700 Oh 33,000.00 23,100
Kepala Tukang 0.2000 Oh 44,000.00 8,800
Mandor 0.2000 Oh 55,000.00 11,000
UKURAN BESI BETON

No Diameter pjg berat/m' (kg) berat/btg (kg)

1 Ø 22 12 m 2.984 35.808
2 Ø 19 12 m 2.226 26.712
3 Ø 16 12 m 1.578 18.936
4 Ø 14 12 m 1.208 14.496
5 Ø 12 12 m 0.888 10.656
6 Ø 10 12 m 0.617 7.404
7 Ø8 12 m 0.395 4.74
8 Ø6 12 m 0.222 2.664
DAFTAR HARGA SATUAN UPAH DAN MATERIAL/BAHAN NON LOKAL
Propinsi : a
Kabupaten : b
Kecamatan : c
Desa : d
HARGA
ONGKOS PAJAK PAJAK PPh
NO URAIAN SAT. SATUAN GALIAN C JUMLAH HARGA RAB
MUAT PPn ( 10 % ) (1,5 % )
(RP)
I UPAH
1 Tukang HOK 80,000 4,000 84,000 84,000
2 Pekerja HOK 50,000 2,500 52,500 52,500
II BAHAN
2 Besi Beton Ф 6 mm Btg 25,000 2,500 375 27,875 27,900
6 Besi Beton Ф 10 mm Btg 63,000 6,300 945 70,245 70,200
8 Besi Beton Ф 12 mm Btg 90,000 9,000 1,350 100,350 100,400
10 Besi Siku Btg 146,000 14,600 2,190 162,790 162,800
11 Besi Siku Btg 201,000 20,100 3,015 224,115 224,100
12 Kawat Ikat Kg 23,000 2,300 345 25,645 25,600
13 Beugel U Bulat ø 16 mm - 52.cm Bh 23,000 2,300 345 25,645 25,600
14 Beugel U Plat - 60 cm Bh 23,000 2,300 345 25,645 25,600
15 Plat Strip ≠ 5 mm - 40 cm Bh 13,000 1,300 195 14,495 14,500
16 Baut Bulat Angkur ø 12 mm - 10 cm Bh 4,250 425 64 4,739 4,700
17 Baut Bulat Angkur ø 12 mm - 15 cm Bh 5,000 500 75 5,575 5,600
18 Baut Bulat Angkur ø 12 mm - 25 cm Bh 6,000 600 90 6,690 6,700
19 Baut Bulat ø 12 mm - 30 cm Bh 8,000 800 120 8,920 8,900
20 Ring/Cincin Baut Bh 500 50 8 558 600
21 Paku 2-3 cm kg 26,000 2,600 390 28,990 29,000
22 Paku 5 cm kg 16,000 1,600 240 17,840 17,800
23 Paku 7 cm kg 16,000 1,600 240 17,840 17,800
24 Paku 10 cm kg 16,000 1,600 240 17,840 17,800
25 Paku 12 cm kg 16,000 1,600 240 17,840 17,800
26 Paku Beton 7 cm kg 21,000 2,100 315 23,415 23,400
27 Paku Beton 10 cm kg 21,000 2,100 315 23,415 23,400
28 Paku Beton 12 cm kg 21,000 2,100 315 23,415 23,400
29 Paku Seng Kg 23,000 2,300 345 25,645 25,600
31 Seng Gelombang BJLS 0,30 mm Lbr 61,000 6,100 915 68,015 68,000
37 Seng plat 40 cm m' 13,000 1,300 195 14,495 14,500
46 Keramik 30 x 30 cm Putih Polos dos 39,000 3,900 585 43,485 43,500
49 Keramik 20 x 20 cm Putih Polos Dos 46,000 4,600 690 51,290 51,300
56 Keramik 20 x 25 cm Bertekstur (Wc/Km) Dos 48,000 4,800 720 53,520 53,500
57 Plint Keramik 10 x 20 cm Bh 8,000 800 120 8,920 8,900
58 Tegel Wafel 20 x 25 cm Dos 1,000 100 15 1,115 1,100
63 Semen Bosowa Zak 61,000 6,100 915 68,015 68,000
66 Semen Putih Zak 101,000 10,100 1,515 112,615 112,600
67 Semen Putih kg 6,000 600 90 6,690 6,700
68 Semen Warna ……… kg 13,000 1,300 195 14,495 14,500
69 Kaca Bening 3 mm M2 101,000 10,100 1,515 112,615 112,600
70 Kaca Riben/Gelap 3 mm M2 126,000 12,600 1,890 140,490 140,500
71 Kaca Bening 5 mm M2 141,000 14,100 2,115 157,215 157,200
72 Kaca Riben/Gelap 5 mm M2 146,000 14,600 2,190 162,790 162,800
73 Tripleks 9 mm Lbr 123,000 12,300 1,845 137,145 137,100
74 Tripleks 6 mm Lbr 88,000 8,800 1,320 98,120 98,100
75 Tripleks 4 mm Lbr 66,000 6,600 990 73,590 73,600
76 Tripleks 3 mm Lbr 51,000 5,100 765 56,865 56,900
77 Teacwood 3 mm Lbr 101,000 10,100 1,515 112,615 112,600
79 Kursi Plastik Bh 51,000 5,100 765 56,865 56,900
80 Lem Aica-Aibon kg 51,000 5,100 765 56,865 56,900
84 Plamir Tembok kg 5,000 500 75 5,575 5,600
85 Dumpul Kayu kg 5,000 500 75 5,575 5,600
87 Politur kg 66,000 6,600 990 73,590 73,600
89 Meni Kayu ltr 23,000 2,300 345 25,645 25,600
90 Meni Besi ltr 23,000 2,300 345 25,645 25,600
94 Cat Seng kg 21,000 2,100 315 23,415 23,400
97 Cat Tembok kg 18,000 1,800 270 20,070 20,100
105 Cat Kayu kg 46,000 4,600 690 51,290 51,300
107 Minyak Cat/Tinner Ltr 26,000 2,600 390 28,990 29,000
109 Amplas Kayu Lbr 3,000 300 45 3,345 3,300
114 Kwas Biasa 4'' Bh 10,000 1,000 150 11,150 11,200
115 Kwas Biasa 3'' Bh 8,000 800 120 8,920 8,900
116 Kwas Biasa 2'' Bh 5,000 500 75 5,575 5,600
117 Kwas Biasa 1'' Bh 4,000 400 60 4,460 4,500
118 Kwas Biasa 3/4'' Bh 2,000 200 30 2,230 2,200
120 Kwas Roll Bh 15,000 1,500 225 16,725 16,700
121 Bak / tempat Cat Tembok Bh 18,000 1,800 270 20,070 20,100
122 Ember Air Bh 18,000 1,800 270 20,070 20,100
123 Kunci tanam 2 x Putar Bh 136,000 13,600 2,040 151,640 151,600
129 Grendel Pintu Bh 13,000 1,300 195 14,495 14,500
131 Grendel Jendela Bh 4,000 400 60 4,460 4,500
132 Grendel Jendela Bh 4,000 400 60 4,460 4,500
133 Grendel Jendela Bh 8,000 800 120 8,920 8,900
134 Engsel Pintu Bh 18,000 1,800 270 20,070 20,100
137 Engsel Jendela Bh 13,000 1,300 195 14,495 14,500
140 Kait Angin Bh 8,000 800 120 8,920 8,900
141 Sekring Box Bh 36,000 3,600 540 40,140 40,100
147 Lampu Phillips 23 watt Bh 41,000 4,100 615 45,715 45,700
150 Fiting Lampu Bh 4,000 400 60 4,460 4,500
151 Saklar Ganda Bh 16,000 1,600 240 17,840 17,800
152 Saklar Tunggal Bh 13,000 1,300 195 14,495 14,500
153 Stop Kontak Lengkap Bh 16,000 1,600 240 17,840 17,800
154 Embol Dos Bh 3,000 300 45 3,345 3,300
155 Kabel Listrik NYM 2 x 1,5 mm Rol 551,000 55,100 8,265 614,365 614,400
161 Klem kabel 10 mm Btg 12,000 1,200 180 13,380 13,400
162 Isolasi Listrik Bh 8,000 800 120 8,920 8,900
163 Sekerup 2.5 cm Doz 7,000 700 105 7,805 7,800
164 Pipa PVC Ф 5/8" (Pembks Kabel) Bh 8,000 800 120 8,920 8,900
165 Pipa PVC 4'' Btg 96,000 9,600 1,440 107,040 107,000
167 Pipa PVC 3'' Btg 76,000 7,600 1,140 84,740 84,700
170 Pipa PVC 2 1/2'' Btg 126,000 12,600 1,890 140,490 140,500
172 Pipa PVC 2 '' Btg 101,000 10,100 1,515 112,615 112,600
174 Pipa PVC 1 1/2'' Btg 76,000 7,600 1,140 84,740 84,700
176 Pipa PVC 1 '' Btg 41,000 4,100 615 45,715 45,700
177 Socket PVC 4'' Bh 23,000 2,300 345 25,645 25,600
178 Elbow PVC 4'' Bh 37,000 3,700 555 41,255 41,300
179 Elbow PVC 1 1/2'' Bh 6,000 600 90 6,690 6,700
180 Socket PVC 1 1/2'' Bh 5,000 500 75 5,575 5,600
181 Tee PVC 1 1/2'' Bh 7,000 700 105 7,805 7,800
182 Knee / Elbow PVC 1 1/2'' Bh 6,000 600 90 6,690 6,700
183 Lem Paralon Bh 8,000 800 120 8,920 8,900
184 Kran air 1/2'' dorong Bh 18,000 1,800 270 20,070 20,100
185 Floor drain ( Plastik ) Bh 12,000 1,200 180 13,380 13,400
186 Wastafel / Kizincing Bh 276,000 27,600 4,140 307,740 307,700
187 Kloset Jongkok Bh 146,000 14,600 2,190 162,790 162,800
189 Kloset Duduk Bh 401,000 40,100 6,015 447,115 447,100
190 Knee / Elbow GIP dia 1/2" Bh 5,000 500 75 5,575 5,600
191 Watermur GIP dia 1/2" Bh 12,000 1,200 180 13,380 13,400
192 Watermur GIP dia 1" Bh 18,000 1,800 270 20,070 20,100
193 Tee GIP dia 1" Bh 10,000 1,000 150 11,150 11,200
195 Oversock GIP dia 1"-1/2" Bh 13,000 1,300 195 14,495 14,500
196 Pipa GIP dia 1'' btg 185,000 18,500 2,775 206,275 206,300
197 Pipa GIP dia 1/2'' btg 126,000 12,600 1,890 140,490 140,500
198 Socket GIP dia 1/2'' Bh 5,000 500 75 5,575 5,600
199 Socket GIP dia 1'' Bh 7,000 700 105 7,805 7,800
200 Tee GIP dia 1/2'' Bh 8,000 800 120 8,920 8,900
201 Selotip Bh 4,000 400 60 4,460 4,500
202 Lem Silicon Bh 15,000 1,500 225 16,725 16,700
204 Pipa Hawa dia 1 1/2" Bh 20,000 2,000 300 22,300 22,300
205 Cangkul Bh 60,000 6,000 900 66,900 66,900
206 Linggis Bh 50,000 5,000 750 55,750 55,800
207 Pick Weel Bh 60,000 6,000 900 66,900 66,900
208 Sekop Bh 60,000 6,000 900 66,900 66,900
209 Sekop Bh 75,000 7,500 1,125 83,625 83,600
210 Ember Kecil Biasa (Cor) Rol 8,000 800 120 8,920 8,900
212 Ember (Campuran) Bh 10,000 1,000 150 11,150 11,200
214 Ember Bak (Untuk Matex) M' 18,000 1,800 270 20,070 20,100
215 Sendok Semen Bh 13,000 1,300 195 14,495 14,500
216 Setrika Kayu bh 15,000 1,500 225 16,725 16,700
217 Lat /mistar Alluminium bh 23,000 2,300 345 25,645 25,600
218 Benang Nilon bh 10,000 1,000 150 11,150 11,200
219 Meteran 5 M bh 12,000 1,200 180 13,380 13,400
220 Hamer Kecil bh 18,000 1,800 270 20,070 20,100
221 Hamer Sedang bh 25,000 2,500 375 27,875 27,900
222 Selang waterpas bh 3,000 300 45 3,345 3,300
223 Selang Air set 180,000 18,000 2,700 200,700 200,700
225 Terpal bh 150,000 15,000 2,250 167,250 167,300
226 Drom Air bh 250,000 25,000 3,750 278,750 278,800
229 Gergaji Kayu bh 40,000 4,000 600 44,600 44,600
230 Gagang Gergaji Besi bh 28,000 2,800 420 31,220 31,200
231 Mata Gergaji Waja bh 15,000 1,500 225 16,725 16,700
232 Mata Gergaji Biasa bh 3,000 300 45 3,345 3,300
233 Kakatua bh 18,000 1,800 270 20,070 20,100
234 Tang Besar bh 30,000 3,000 450 33,450 33,500
235 Tang Sedang bh 12,000 1,200 180 13,380 13,400
236 Obeng Bunga sedang bh 8,000 800 120 8,920 8,900
237 Obeng Plat sedang bh 8,000 800 120 8,920 8,900
238 Alat Pemotong Keramik bh 135,000 13,500 2,025 150,525 150,500
239 Kawat Ayakan halus M' 20,000 2,000 300 22,300 22,300
240 Kawat Ayakan kasar M' 20,000 2,000 300 22,300 22,300
241 Kunci Pipa 1/2'' - 2'' No 26 bh 90,000 9,000 1,350 100,350 100,400
242 Kunci Pipa 1/2'' - 2'' No 36 bh 160,000 16,000 2,400 178,400 178,400
243 Kunci Pipa 3'' bh 300,000 30,000 4,500 334,500 334,500
244 Pisau Dumpul kecil bh 4,000 400 60 4,460 4,500
245 Pisau Dumpul besar bh 6,000 600 90 6,690 6,700
246 Pisau Plamir kecil bh 4,000 400 60 4,460 4,500
247 Pisau Plamir besar bh 6,000 600 90 6,690 6,700
DAFTAR HARGA SATUAN UPAH DAN MATERIAL/BAHAN NON LOKAL
Propinsi : a
Kabupaten : b
Kecamatan : c
Desa : d
HARGA
ONGKOS PAJAK PAJAK PPh
NO URAIAN SAT. SATUAN GALIAN C JUMLAH HARGA RAB
MUAT PPn ( 10 % ) (1,5 % )
(RP)
I UPAH
1 Tukang HOK 40,000
2 Pekerja HOK 30,000
II BAHAN
1 Batako Bh

2 Batu Gunung M³ 98,000 7,500 20,000 9,800 1,470 136,770 136,800

3 Batu Belah 15/20 M³ 98,000 7,500 20,000 9,800 1,470 136,770 136,800

4 Batu Belah 5/7 M³ 108,000 7,500 20,000 10,800 1,620 147,920 147,900

5 Batu Belah 3/5 M³ 328,000 7,500 20,000 32,800 4,920 393,220 393,200

6 Batu Belah 2/3 M³ 328,000 8,000 20,000 32,800 4,920 393,720 393,700

7 Bata Merah Bh 750 75 11 836 800

8 Pasir Pasang M³ 98,000 6,000 20,000 9,800 1,470 135,270 135,300

9 Pasir Beton M³ 98,000 6,000 20,000 9,800 1,470 135,270 135,300

10 Pasir Urug M³ 98,000 8,000 20,000 9,800 1,470 137,270 137,300

11 Tanah Urug M³ 98,000 4,000 20,000 9,800 1,470 133,270 133,300

12 Sirtu M³ 98,000 8,000 20,000 9,800 1,470 137,270 137,300


DAFTAR HARGA SATUAN UPAH DAN MATERIAL/BAHAN NON LOKAL
Propinsi : a
Kabupaten : b
Kecamatan : c
Desa : d
HARGA
ONGKOS PAJAK PAJAK PPh
NO URAIAN SAT. SATUAN GALIAN C JUMLAH HARGA RAB
MUAT PPn ( 10 % ) (1,5 % )
(RP)
I BAHAN
1 Papan Mal / Begesting Kls III (3.5 Cm) Lbr 36,000 3,600 540 40,140 40,100
M3 653,000 65,300 9,795 728,095 728,100
2 Kayu Balok 7/15 kelas I Btg 272,000 27,200 4,080 303,280 303,300
M3 6,553,000 655,300 98,295 7,306,595 7,306,600
3 Kayu Balok 8/12 kelas II Btg 102,000 10,200 1,530 113,730 113,700
M3 2,653,000 265,300 39,795 2,958,095 2,958,100
4 Kayu Balok 6/12 kelas II Btg 88,000 8,800 1,320 98,120 98,100
M3 3,053,000 305,300 45,795 3,404,095 3,404,100
5 Kayu Balok 6/10 kelas II Btg 73,000 7,300 1,095 81,395 81,400
M3 3,053,000 305,300 45,795 3,404,095 3,404,100
6 Kayu Usuk 5/7 kelas II Btg 33,000 3,300 495 36,795 36,800
M3 2,653,000 265,300 39,795 2,958,095 2,958,100
7 Kayu Usuk 4/6 kelas II Btg 29,000 2,900 435 32,335 32,300
M3 3,053,000 305,300 45,795 3,404,095 3,404,100
8 Papan tebal 4 cm kelas I Lbr 272,000 27,200 4,080 303,280 303,300
M3 6,553,000 655,300 98,295 7,306,595 7,306,600
9 Papan tebal 4 cm kelas II Lbr 102,000 10,200 1,530 113,730 113,700
M3 2,653,000 265,300 39,795 2,958,095 2,958,100
10 Papan tebal 3 cm kelas I Lbr 272,000 27,200 4,080 303,280 303,300
M3 6,553,000 655,300 98,295 7,306,595 7,306,600
11 Papan tebal 3 cm kelas II Lbr 90,000 9,000 1,350 100,350 100,400
M3 3,053,000 305,300 45,795 3,404,095 3,404,100
12 Papan tebal 2.5 cm kelas I Lbr 272,000 27,200 4,080 303,280 303,300
M3 6,553,000 655,300 98,295 7,306,595 7,306,600
13 Papan tebal 2.5 cm kelas II Lbr 69,000 6,900 1,035 76,935 76,900
DAFTAR HARGA SATUAN UPAH DAN MATERIAL/BAHAN NON LOKAL
Propinsi : a
Kabupaten : b
Kecamatan : c
Desa : d
HARGA PAJAK PAJAK PPh
NO URAIAN SATUAN SATUAN PPn ( 10 % ) (1,5 % ) JUMLAH HARGA RAB

I BAHAN
1 Lemari Buku bh
ukr. Pjg 0,70, lbr 0,40 tinggi 1,50 m
Rak atas kaca dorong 3 mm
* Rangka kayu kls I Bayam 4/5, penutup triplek 2,8 mm, 1 daun pintu Jati 1,260,000 126,000 18,900 1,404,900 1,404,900
* Rangka kayu Jati 4/5, penutup triplek 2,8 mm, 1 daun pintu Jati 1,260,000 126,000 18,900 1,404,900 1,404,900
* Rangka kayu Mahoni 4/5, penutup triplek 2,8 mm, 1 daun pintu Mahoni 910,000 91,000 13,650 1,014,650 1,014,700
- - - -
2 Papan Tulis bh 405,000 40,500 6,075 451,575 451,600
ukr. Pjg 1,5 m, lebar 1,25 m
Rangka kayu Kls I bayam

3 Meja 1/2 biro bh


ukr. Tinggi 0,75 m
panjang 1,25 m
lebar 0,60 m
* Rangka kayu kls I 4/5, penutup triplek / Daun Papan Jati 1,410,000 141,000 21,150 1,572,150 1,572,200
* Rangka kayu Jati 4/5, penutup triplek / Daun Papan Jati 1,410,000 141,000 21,150 1,572,150 1,572,200

4 Kursi Kantor bh 355,000 35,500 5,325 395,825 395,800


ukr. Tinggi 0,85 m
tinggi duduk 0,40 m
lebar depan 0,40 m , Lebar samping 0.45 m
Rangka kayu kls I / Jati , penutup / Daun Papan Jati

5 Meja murid bh
ukr. Tinggi 0,75 m
panjang 1,00 m, Lebar 0.60 m
* Rangka kayu kls I Bayam 4/5, penutup triplek / Daun Papan Jati 508,000 50,800 7,620 566,420 566,400
* Rangka kayu Jati 4/5, penutup triplek / Daun Papan Jati 505,000 50,500 7,575 563,075 563,100

6 Kursi murid bh
ukr. Tinggi 0,90 m
tinggi duduk 0,40 m
lebar depan 0,40 m , Lebar samping 0.40 m
* Rangka kayu kls I Bayam , penutup / Daun Papan Jati 355,000 35,500 5,325 395,825 395,800
* Rangka kayu Jati , penutup / Daun Papan Jati 355,000 35,500 5,325 395,825 395,800

7 Daun Pintu Panil Papan bh 1,310,000 131,000 19,650 1,460,650 1,460,700


ukr. 0,82 x 2,0 m s/d 2.10 m
bahan kayu kls I, disain standar sesuai gambar

8 Daun Pintu Panil Papan 1,510,000 151,000 22,650 1,683,650 1,683,700


ukr. 0,92 x 2,0 m s/d 2.10 m
bahan kayu kls I, disain standar sesuai gambar

9 Daun Pintu Double Teakwood bh 660,000 66,000 9,900 735,900 735,900


ukr 0,82 x 2,0 m s/d 2.10 m
bahan kayu kls I Bayam , disain standar sesuai gambar

10 Daun Pintu Teakwood bh 710,000 71,000 10,650 791,650 791,700


Lapis seng Plat.
ukr 0,72 x 2,0 m s/d 2.10 m
bahan kayu kls I, disain standar sesuai gambar

11 Daun Pintu Trali Papan bh


* Ukr. 0.92 x 1.20 m Rangka papan Kls I (Daun pintu Irisan Papan) 660,000 66,000 9,900 735,900 735,900
* Ukr. 0.92 x 1.20 m Rangka papan Jati (Daun pintu Irisan Papan) 660,000 66,000 9,900 735,900 735,900

12 Daun Jendela Panil Kaca bh


ukr. 0,62 x 1,25 M
* Bahan kayu kls I Bayam 408,000 40,800 6,120 454,920 454,900
* Bahan kayu Jati 405,000 40,500 6,075 451,575 451,600
13 Daun Jendela Panil Kaca bh
ukr. 0,62 x 1,52 M s/d ……... M
* Bahan kayu kls I Bayam 508,000 50,800 7,620 566,420 566,400
* Bahan kayu Jati 508,000 50,800 7,620 566,420 566,400

14 Daun Ventilasi Jendela bh


Panil Kaca
ukr. 0,62 x 1,25 M
* Bahan kayu kls I Bayam 255,000 25,500 3,825 284,325 284,300
* Bahan kayu Jati 255,000 25,500 3,825 284,325 284,300

15 Kusen Pintu type I standar bh 610,000 61,000 9,150 680,150 680,200


Ukr Kayu Kosen 5/13 cm
Ukr. Bersih dalam, tinggi lubang pintu 2,00 m, lebar 0,90 m
Kayu Kls I, Jenis Bayam

16 Kusen Pintu type II standar bh 610,000 61,000 9,150 680,150 680,200


Ukr Kayu Kosen 5/13 cm
Ukr. Bersih dalam, tinggi lubang pintu 2,00 m, lebar 0,80 m
Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,80 m
Kayu Kls I, Jenis Bayam

17 Kusen Pintu type III standar bh 560,000 56,000 8,400 624,400 624,400
Ukr Kayu Kosen 5/13 cm
Ukr. Bersih dalam, tinggi lubang pintu 2,00 m, lebar 0,70 m
Tanpa lubang Ventilasi
Kayu Kls I, Jenis Bayam

18 Kusen Pintu Stek bh 355,000 35,500 5,325 395,825 395,800


Ukr Kayu Kosen 5/13 cm
Ukr. Tinggi 1.00 m
Kayu Kls I, Jenis Bayam

19 Kusen Jendela Type I standar bh 360,000 36,000 5,400 401,400 401,400


Ukr Kayu Kosen 5/13 cm
Ukr. Bersih dalam, tinggi lubang pintu 1.25 m, lebar 0,60 m
Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,60 m
Kayu Kls I, Jenis Bayam

20 Kusen Jendela Type I standar bh 360,000 36,000 5,400 401,400 401,400


Ukr Kayu Kosen 5/13 cm
Ukr. Bersih dalam, tinggi lubang pintu 1.50 m, lebar 0,60 m
Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,60 m
Kayu Kls I, Jenis Bayam

21 Kusen BV bh 305,000 30,500 4,575 340,075 340,100


Ukr Kayu Kosen 5/13 cm
Ventilasi tinggi lubang Ventilasi 0,40 m, lebar 0,60 m
Kayu Kls I, Jenis Bayam

22 Daun Pintu WC/KM bh 710,000 71,000 10,650 791,650 791,700


Ukr. Pintu Tinggi 2.00 m. Lebar 0.70 m
Daun pintu PVC ( Warna Kayu, Warna Hijau, Biru )
HARGA SATUAN
Propinsi : Nusa Tenggara Timur

Kabupaten : Flores Timur


Kecamatan : ……………………….
Desa : ……………………….

JUMLAH HARGA SAT.


NO TENAGA KERJA HARGA DASAR UPAH PAJAK 5 %
RAB
1 Tukang Rp 80,000 Rp 4,000 Rp 84,000
2 Pekerja Rp 50,000 Rp 2,500 Rp 52,500
3 Mandor Rp -

GALIAN C
ONGKOS MUAT /
PPN PPh JUMLAH
JUMLAH HARGA SAT.
NO MATERIAL SATUAN HARGA DASAR ANGKUT RAB

20% 10% 1,5%


A B C D E F G H I=E+F+G+H J=I
KAYU
Kayu Papan 3 / 20 Klas III Panjang 4 m' Lbr 49,000 4,900 735 54,635 55,000
1 Papan Cor 3/25-4 Panjang 4 m' Lbr 48,500 4,850 728 54,078 54,100
2 Kayu Kaso 5 / 7 Klas III Panjang 4 m' Btg 40,000 4,000 600 44,600 44,600
3 Kayu/Balok 6/12 - -
Klas I Panjang 4 m' Btg 295,000 29,500 4,425 328,925 329,000
Klas II Panjang 4 m' Btg 193,000 19,300 2,895 215,195 215,000
4 Papan Gapit Kuda-Kuda (tebal : 3 cm x Lebar : 12 cm) - -
Klas I Panjang 4 m' Lbr 150,000 15,000 2,250 167,250 167,000
Klas II Panjang 4 m' Lbr - - - -
5 Balok kayu 5/10 klas II - -
Klas I Panjang 4 m' Btg 192,000 19,200 2,880 214,080 214,000
Klas II Panjang 4 m' Btg 140,000 14,000 2,100 156,100 156,000
6 Papan Listplank 3/30 - -
Klas I Panjang 4 m' Lbr 160,000 16,000 2,400 178,400 178,000
Klas II Panjang 4 m' Lbr 125,000 12,500 1,875 139,375 139,000
Gipsum/Press Panjang 4 m' Lbr 150,000 15,000 2,250 167,250 167,000
- -
7 Usuk 5/7 - -
Klas I Panjang 4 m' Bh 49,300 4,930 740 54,970 55,000
Klas II Panjang 4 m' Bh 35,200 3,520 528 39,248 39,000
- -
8 List plafond kayu profil - -
Klas I Panjang 4 m' Lbr 15,000 1,500 225 16,725 17,000
Klas II Panjang 4 m' Lbr 10,000 1,000 150 11,150 11,000
Gipsum/Press Panjang 4 m' Lbr 12,000 1,200 180 13,380 13,000
- -
BATU, PASIR - -
1 Batako Bh 5,000 500 75 5,575 6,000
2 Batu merah Bh 900 90 14 1,004 1,000
3 Pasir pasang M³ 200,000 6,000 20,000 3,000 229,000 229,000
4 Pasir urug M³ 200,000 6,000 20,000 3,000 229,000 229,000
5 Tanah urug M³ 150,000 4,000 15,000 2,250 171,250 171,000
6 Batu 15/20 M³ 200,000 7,500 20,000 3,000 230,500 231,000
7 Kerikil uk. 2/3 M³ 500,000 9,000 50,000 7,500 566,500 567,000
PINTU JENDELA + BOVEN.
1 Daun Pintu (P1) Lebar 85 cm - -
Jati Lokal Lbr 1,750,000 175,000 26,250 1,951,250 1,951,000
Panil Dobel Triplex Lbr 750,000 75,000 11,250 836,250 836,000
2 Daun Pintu (P2) Lebar 75 cm - -
Jati Lokal Lbr 1,600,000 160,000 24,000 1,784,000 1,784,000
Panil Dobel Triplex Lbr 750,000 75,000 11,250 836,250 836,000
3 Daun Jendela (J1) Lebar 60 cm - -
Jati Lokal Lbr 350,000 35,000 5,250 390,250 390,000
Panil Kaca 5 mm Lbr 300,000 30,000 4,500 334,500 335,000
4 Daun Jendela (J2) Lebar 50 cm - -
Jati Lokal Lbr 350,000 35,000 5,250 390,250 390,000
Panil Kaca 5 mm Lbr 300,000 30,000 4,500 334,500 335,000
5 Bouven - -
Batu Rosrter bh 20,000 2,000 300 22,300 22,000
Kosen Kayu Klas I bh 40,000 4,000 600 44,600 45,000
6 Daun Bouven - -
Kayu Jati bh 100,000 10,000 1,500 111,500 112,000
7 Kusen Pintu - -
Klas I Lubang 65,000 6,500 975 500,000 500,000
Klas II Lubang 250,000 25,000 3,750 278,750 279,000
8 Kusen Jendela - -
Klas I Lubang 250,000 25,000 3,750 278,750 279,000
Klas II Lubang 200,000 20,000 3,000 223,000 223,000
9 Meja 1/2 Biro - -
Jati Lokal Unit 1,250,000 125,000 18,750 1,393,750 1,394,000
Suren Unit 1,200,000 120,000 18,000 1,338,000 1,338,000
10 Kursi Kayu Jati - -
Jati Lokal Unit 250,000 25,000 3,750 278,750 279,000
Suren Unit 200,000 20,000 3,000 223,000 223,000
11 Meja Biasa - -
Jati Lokal Unit 175,000 17,500 2,625 195,125 195,000
Suren Unit 160,000 16,000 2,400 178,400 178,000
12 Lemari Arsip - -
Jati Lokal Unit 750,000 75,000 11,250 836,250 836,000
Suren Unit 550,000 55,000 8,250 613,250 613,000
Tempat Tidur Jati Lokal Unit 1,200,000 120,000 18,000 1,338,000 1,338,000

13 Bangku Kayu Jati Lokal Unit 300,000 30,000 4,500 334,500 335,000
Suren Unit 250,000 25,000 3,750 278,750 279,000

TOKO / FABRIKASI

1 Semen 40 kg
Bosowa Zak 55,000 5,000 5,500 825 66,325 66,000
Tonasa Zak 55,000 5,000 5,500 825 66,325 66,000
Gresik Zak 55,000 5,000 5,500 825 66,325 66,000
2 Besi polos Ø 12 mm Asli ( SNI ) Lonjor 200,000 20,000 3,000 223,000 223,000
3 Besi polos Ø 10 mm Asli ( SNI ) Lonjor 91,000 9,100 1,365 101,465 101,000
4 Besi polos Ø 8 mm Asli ( SNI ) Lonjor 70,000 7,000 1,050 78,050 78,000
5 Besi polos Ø 6 mm Asli ( SNI ) Lonjor 47,000 4,700 705 52,405 52,000
6 Kawat beton kg 25,000 2,500 375 27,875 28,000
7 Seng Gel. BJLS 0,30 - - -
Warna Lbr 48,000 4,800 720 53,520 54,000
Polos Lbr 70,000 7,000 1,050 78,050 78,000
8 Paku seng kg 28,000 2,800 420 31,220 31,000
9 Seng plat 0,30 m 20,000 2,000 300 22,300 22,000
10 Paku 16 kg 20,000 2,000 300 22,300 22,000
11 Paku 12 (Paku Putih) kg 20,000 2,000 300 22,300 22,000
12 Paku 12 (Biasa) kg 20,000 2,000 300 22,300 22,000
13 Paku 10 biasa kg 20,000 2,000 300 22,300 22,000
14 Paku 7 biasa kg 20,000 2,000 300 22,300 22,000
15 Paku 5 biasa kg 20,000 2,000 300 22,300 22,000
16 Plat Strip Tebal 4 mm - Pjg 60 cm Bh 15,000 1,500 225 16,725 17,000
17 Plat Strip Tebal 4 mm - Pjg 40 cm Bh 15,000 1,500 225 16,725 17,000
18 Plat Strip Tebal 4 mm - Pjg 20 cm Bh 15,000 1,500 225 16,725 17,000
18 Beugel U bulat 3 - 60 cm Bh 15,000 1,500 225 16,725 17,000
19 Mor Baut ø 12 mm - Panjang 16 cm Bh 10,000 1,000 150 11,150 11,000
20 Mor Baut ø 12 mm - Panjang 30 cm Bh 10,000 1,000 150 11,150 11,000
21 Baut Angkur ø 14 mm - Pjg 25 cm Bh 10,000 1,000 150 11,150 11,000
22 Ring/Cinci Baut Bh 500 50 8 558 1,000
23 Engsel Pintu Merk ................................. Bh 30,000 3,000 450 33,450 33,000
Merk ................................. Bh 30,000 3,000 450 33,450 33,000
Merk ................................. Bh 30,000 3,000 450 33,450 33,000
24 Engsel Jendela Merk ................................. Bh 20,000 2,000 300 22,300 22,000
Merk ................................. Bh 20,000 2,000 300 22,300 22,000
Merk ................................. Bh 20,000 2,000 300 22,300 22,000
25 Grendel Pintu Merk ................................. Bh 15,000 1,500 225 16,725 17,000
Merk ................................. Bh 15,000 1,500 225 16,725 17,000
Merk ................................. Bh 15,000 1,500 225 16,725 17,000
26 Kait Angin Merk ................................. Bh 15,000 1,500 225 16,725 17,000
Merk ................................. Bh 15,000 1,500 225 16,725 17,000
Merk ................................. Bh 15,000 1,500 225 16,725 17,000
27 Grendel Jendela Merk ................................. Bh 15,000 1,500 225 16,725 17,000
Merk ................................. Bh 15,000 1,500 225 16,725 17,000
Merk ................................. Bh 15,000 1,500 225 16,725 17,000
28 Kunci Tanam Doubel Slag Merk ................................. Bh 120,000 12,000 1,800 133,800 134,000
Merk ................................. Bh 150,000 15,000 2,250 167,250 167,000
Merk ................................. Bh 100,000 10,000 1,500 111,500 112,000
29 Keramik 40x40 cm Merk ................................. dos 95,000 9,500 1,425 105,925 106,000
30 Keramik 30x30 cm Merk ................................. dos 70,000 7,000 1,050 78,050 78,000
31 Keramik 20x20 cm Merk ................................. dos 65,000 6,500 975 72,475 72,000
Keramik lantai WC 20x20
32 Motif, Kasar dos 50,000 5,000 750 55,750 56,000
cm
33 Semen warna kg 20,000 2,000 300 22,300 22,000
34 Plywood 3 mm lbr 95,000 9,500 1,425 105,925 106,000
35 Plywood 9 mm lbr 120,000 12,000 1,800 133,800 134,000
36 Paku tripleks 3 cm kg 25,000 2,500 375 27,875 28,000
37 Cat seng (biru laut) Merk ................................. - -
5 ( Lima ) kg 60,000 6,000 900 66,900 67,000
1 ( Satu ) kg 20,000 2,000 300 22,300 22,000
38 Cat plafond (Putih) Merk ................................. - -
5 ( Lima ) kg 85,000 8,500 1,275 94,775 95,000
20 ( Dua Puluh ) kg 120,000 12,000 1,800 133,800 134,000
39 Cat dinding (kuning telur) Merk ................................. - -
5 ( Lima ) kg 85,000 8,500 1,275 94,775 95,000
20 ( Dua Puluh ) kg 120,000 12,000 1,800 133,800 134,000
40 Cat listplank (merah hati) Merk ................................. - -
5 ( Lima ) kg 60,000 6,000 900 66,900 67,000
1 ( Satu ) kg 20,000 2,000 300 22,300 22,000
Minyak cat/Tinner kg 25,000 2,500 375 27,875 28,000
Meni kg 25,000 2,500 375 27,875 28,000
41 Neon Spiral, Jari
Lampu Phillips 5 watt Bh 35,000 3,500 525 39,025 39,000
Lampu Phillips 8 watt Bh 50,000 5,000 750 55,750 56,000
Lampu Phillips 14 watt Bh 65,000 6,500 975 72,475 72,000
Lampu Phillips 18 watt Bh 70,000 7,000 1,050 78,050 78,000
Lampu Phillips 23 watt Bh 95,000 9,500 1,425 105,925 106,000

42 Saklar Ganda Bh 20,000 2,000 300 22,300 22,000


43 Saklar Tunggal btg 15,000 1,500 225 16,725 17,000
44 Stop Kontak Bh 15,000 1,500 225 16,725 17,000
45 Fiting Lapmu Bh 15,000 1,500 225 16,725 17,000
46 Instalasi Listrik Ls 2,500,000 250,000 37,500 2,787,500 2,788,000
47 Pipa PVC Ø 4'' btg 215,000 21,500 3,225 239,725 240,000
48 Soket PVC 4'' 135° Bh 10,000 1,000 150 11,150 11,000
49 Pipa PVC Ø 2'' Bh 120,000 12,000 1,800 133,800 134,000
50 Soket PVC 2'' 135° Bh 10,000 1,000 150 11,150 11,000
51 Lem Paralon Bh 5,000 500 75 5,575 6,000
52 Socket PVC Ø 4" Bh 10,000 1,000 150 11,150 11,000
53 Socket PVC Ø 2" Bh 10,000 1,000 150 11,150 11,000
54 Knee PVC 4" Bh 20,000 2,000 300 22,300 22,000
55 Knee PVC 2" Bh 20,000 2,000 300 22,300 22,000
56 Kloset Jongkok Bh 120,000 12,000 1,800 133,800 134,000
57 Elbow PVC 4'' Bh 20,000 2,000 300 22,300 22,000
58 Pipa Penguras Bh 20,000 2,000 300 22,300 22,000
59 Pipa Hawa Bh 25,000 2,500 375 27,875 28,000
60 Profil Tank
2200 Ltr Bh 3,800,000.00 380,000 57,000 4,237,000 4,237,000
1100 Ltr Bh 2,000,000 200,000 30,000 2,230,000 2,230,000
61 Floor drain Bh 5,000 500 75 5,575 6,000

PERALATAN
1 Paquel Bh 60,000 6,000 900 66,900 67,000
2 Cangkul Bh 60,000 6,000 900 66,900 67,000
3 Linggis Bh 60,000 6,000 900 66,900 67,000
4 Sekop Bh 70,000 7,000 1,050 78,050 78,000
5 Ember Cor Bh 15,000 1,500 225 16,725 17,000
6 Ember Anti Pecah Ukuran Sedang Bh 25,000 2,500 375 27,875 28,000
7 Kuas biasa
Kecil Bh 10,000 1,000 150 11,150 11,000
Sedang Bh 12,000 1,200 180 13,380 13,000
Besar Bh 15,000 1,500 225 16,725 17,000
8 Kuas roll Bh 35,000 3,500 525 39,025 39,000
9 Kawat Ayak m' 25,000 2,500 375 27,875 28,000
10 Amplas Lbr 5,000 500 75 5,575 6,000
11 Benang Nillon Roll 10,000 1,000 150 11,150 20,000
12 Terpal 4 x 6 Bh 180,000 18,000 2,700 200,700 201,000
13 Gerobak Dorong Unit 400,000 40,000 6,000 446,000 446,000
14 Drom Plastik 200 Ltr Bh 200,000 20,000 3,000 223,000 223,000

LAIN - LAIN
1 Air Kerja 5000 ltr tanki 350,000 350,000 350,000
2 Papan Nama Proyek Baliho + Rangka Ls 100,000 100,000 100,000
Kayu
Triplex + Rangka
Kayu Ls 100,000 100,000 100,000
3 Prasasti Keramik Bh 700,000 700,000 700,000
Pasangan Batu Ls 700,000 700,000 700,000
Menghitung Harga Satuan Pekerjaan

ANALISA HARGA SATUAN PEKERJAAN UNTUK KONSTRUKSI BANGUNAN GEDUNG DAN


PERUMAHAN

I. Pekerjaan Tanah
SNI 2835 - 2008
1.1 Menggali 1 m3 tanah biasa sedalam 1 meter Rp - Rp 19,875

Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Tenaga kerja Pekerja OH 0.750 Rp 25,000 Rp - Rp 18,750


Mandor OH 0.025 Rp 45,000 Rp - Rp 1,125

1.2 Menggali 1 m3 tanah biasa sedalam 2 meter Rp - Rp 24,525

Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Tenaga kerja Pekerja OH 0.900 Rp 25,000 Rp - Rp 22,500


Mandor OH 0.045 Rp 45,000 Rp - Rp 2,025

1.3 Menggali 1 m3 tanah biasa sedalam 3 meter Rp - Rp 29,265

Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Tenaga kerja Pekerja OH 1.050 Rp 25,000 Rp - Rp 26,250


Mandor OH 0.067 Rp 45,000 Rp - Rp 3,015

1.4 Menggali 1 m3 tanah keras sedalam 1 meter Rp - Rp 26,440

Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Tenaga kerja Pekerja OH 1.000 Rp 25,000 Rp - Rp 25,000


Mandor OH 0.032 Rp 45,000 Rp - Rp 1,440

1.5 Menggali 1 m3 tanah cadas sedalam 1 meter Rp - Rp 40,200

Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Tenaga kerja Pekerja OH 1.500 Rp 25,000 Rp - Rp 37,500


Mandor OH 0.060 Rp 45,000 Rp - Rp 2,700

1.6 Menggali 1 m3 tanah lumpur sedalam 1 meter Rp - Rp 32,025

Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Tenaga kerja Pekerja OH 1.200 Rp 25,000 Rp - Rp 30,000


Mandor OH 0.045 Rp 45,000 Rp - Rp 2,025

Spesialis Infrastruktur NMC PNPM-MPd Page 136 of 289


Menghitung Harga Satuan Pekerjaan

1.7 Mengerjakan 1 m2 stripping tebing setinggi 1 meter Rp - Rp 1,475

Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Tenaga kerja Pekerja OH 0.050 Rp 25,000 Rp - Rp 1,250


Mandor OH 0.005 Rp 45,000 Rp - Rp 225

1.8 Membuang 1 m3 tanah sejauh 30 meter Rp - Rp 8,700

Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Tenaga kerja Pekerja OH 0.330 Rp 25,000 Rp - Rp 8,250


Mandor OH 0.010 Rp 45,000 Rp - Rp 450

Mengurug kembali 1 m3
galian dihitung dari 1/3
1.9 Mengurug kembali 1 m3 galian
kali upah pekerjaan
galian

Mengurug kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian

1.10 Memadatkan 1 m3 tanah (per 20 cm) Rp - Rp 14,750

Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Tenaga kerja Pekerja OH 0.500 Rp 25,000 Rp - Rp 12,500


Mandor OH 0.050 Rp 45,000 Rp - Rp 2,250

1.11 Mengurug 1 m3 pasir urug Rp - Rp 7,950

Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Bahan Pasir urug m 3


1.200 Rp - Rp -
Tenaga kerja Pekerja OH 0.300 Rp 25,000 Rp 7,500
Mandor OH 0.010 Rp 45,000 Rp 450

1.12 Memasang 1 m3 Lapisan pudel campuran 1 KP : 3 PP : 7 TL Rp 50,000 Rp 39,200

Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Kapur padam m 3
0.135 Rp - Rp -
Bahan Pasir Pasang m3 0.400 Rp 125,000 Rp 50,000
Tanah Liat m3 0.948 Rp - Rp -
Pekerja OH 0.800 Rp 25,000 Rp 20,000
Tukang batu OH 0.400 Rp 35,000 Rp 14,000
Tenaga kerja
Kepala tukang OH 0.040 Rp 40,000 Rp 1,600
Mandor OH 0.080 Rp 45,000 Rp 3,600

1.13 Memasang 1 m3 Lapisan pudel campuran 1 KP : 5 TL Rp - Rp 39,200

Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Spesialis Infrastruktur NMC PNPM-MPd Page 137 of 289


Menghitung Harga Satuan Pekerjaan

Kapur padam m3 0.248 Rp - Rp -


Bahan
Tanah Liat m3 1.240 Rp - Rp -
Pekerja OH 0.800 Rp 25,000 Rp 20,000
Tukang batu OH 0.400 Rp 35,000 Rp 14,000
Tenaga kerja
Kepala tukang OH 0.040 Rp 40,000 Rp 1,600
Mandor OH 0.080 Rp 45,000 Rp 3,600

1.14 Memasang 1 m2 lapisan ijuk tebal 10 cm Rp - Rp 4,425

Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Bahan Ijuk kg 6.000 Rp - Rp -


Tenaga kerja Pekerja OH 0.150 Rp 25,000 Rp 3,750
Mandor OH 0.015 Rp 45,000 Rp 675

1.15 Mengurug 1 m3 sirtu padat untuk peninggian lantai bangunan Rp - Rp 7,375

Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Bahan Sirtu m 3
1.200 Rp - Rp -
Tenaga kerja Pekerja OH 0.250 Rp 25,000 Rp 6,250
Mandor OH 0.025 Rp 45,000 Rp 1,125

II. PEKERJAAN PONDASI


SNI 2837 - 2008
2.1 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 PP Rp 448,625 Rp 70,125

Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Batu belah 15 cm/20 cm m3 1.200 Rp 155,000 Rp 186,000


Bahan Portland Cement kg 202.000 Rp 1,000 Rp 202,000
Pasir Pasang m3 0.485 Rp 125,000 Rp 60,625
Pekerja OH 1.500 Rp 25,000 Rp 37,500
Tukang batu OH 0.750 Rp 35,000 Rp 26,250
Tenaga kerja
Kepala tukang OH 0.075 Rp 40,000 Rp 3,000
Mandor OH 0.075 Rp 45,000 Rp 3,375

2.2 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP Rp 414,000 Rp 70,125

Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Batu belah 15 cm/20 cm m 3


1.200 Rp 155,000 Rp 186,000
Bahan Portland Cement kg 163.000 Rp 1,000 Rp 163,000
Pasir Pasang m3 0.520 Rp 125,000 Rp 65,000
Pekerja OH 1.500 Rp 25,000 Rp 37,500
Tukang batu OH 0.750 Rp 35,000 Rp 26,250
Tenaga kerja
Kepala tukang OH 0.075 Rp 40,000 Rp 3,000
Mandor OH 0.075 Rp 45,000 Rp 3,375

Spesialis Infrastruktur NMC PNPM-MPd Page 138 of 289


Menghitung Harga Satuan Pekerjaan

2.3 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 5 PP Rp 390,000 Rp 70,125

Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Batu belah 15 cm/20 cm m3 1.200 Rp 155,000 Rp 186,000


Bahan Portland Cement kg 136.000 Rp 1,000 Rp 136,000
Pasir Pasang m3 0.544 Rp 125,000 Rp 68,000
Pekerja OH 1.500 Rp 25,000 Rp 37,500
Tukang batu OH 0.750 Rp 35,000 Rp 26,250
Tenaga kerja
Kepala tukang OH 0.075 Rp 40,000 Rp 3,000
Mandor OH 0.075 Rp 45,000 Rp 3,375

2.4 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 6 PP Rp 373,125 Rp 70,125


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu belah 15 cm/20 cm m3 1.200 Rp 155,000 Rp 186,000
Portland Cement kg 117.000 Rp 1,000 Rp 117,000
Bahan Pasir Pasang m3 0.561 Rp 125,000 Rp 70,125
Pekerja OH 1.500 Rp 25,000 Rp 37,500
Tukang batu OH 0.750 Rp 35,000 Rp 26,250
Kepala tukang OH 0.075 Rp 40,000 Rp 3,000
Tenaga kerja  
Mandor OH 0.075 Rp 45,000 Rp 3,375
Mandor
OH Rp 350,000 Rp 70,125
2.5 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 8 PP
0,075
Kebutuhan  Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu belah 15 cm/20 cm m3 1.200 Rp 155,000 Rp 186,000
Portland Cement kg 91.000 Rp 1,000 Rp 91,000
Bahan Pasir Pasang m3 0.584 Rp 125,000 Rp 73,000
Pekerja OH 1.500 Rp 25,000 Rp 37,500
Tukang batu OH 0.750 Rp 35,000 Rp 26,250
Kepala tukang OH 0.075 Rp 40,000 Rp 3,000
Tenaga kerja Mandor OH 0.075 Rp 45,000 Rp 3,375

2.6 Memasang 1 m3 pondasi batu belah, campuran 1 KP : 1 SM : 2 PP Rp 228,500 Rp 70,125


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu belah 15 cm/20 cm m3 1.200 Rp 155,000 Rp 186,000
Kapur padam m3 0.170 Rp - Rp -
Semen Merah m3 0.170 Rp - Rp -
Bahan Pasir Pasang m3 0.340 Rp 125,000 Rp 42,500
Pekerja OH 1.500 Rp 25,000 Rp 37,500
Tukang batu OH 0.750 Rp 35,000 Rp 26,250
Kepala tukang OH 0.075 Rp 40,000 Rp 3,000
Tenaga kerja Mandor OH 0.075 Rp 45,000 Rp 3,375

2.7 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 KP : 10 PP Rp 308,500 Rp 70,125


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu belah 15 cm/20 cm m3 1.200 Rp 155,000 Rp 186,000

Spesialis Infrastruktur NMC PNPM-MPd Page 139 of 289


Bahan
Menghitung Harga Satuan Pekerjaan

Portland Cement kg 61.000 Rp 1,000 Rp 61,000


Kapur padam m3 0.147 Rp - Rp -
Bahan Pasir Pasang m3 0.492 Rp 125,000 Rp 61,500
Pekerja OH 1.500 Rp 25,000 Rp 37,500
Tukang batu OH 0.750 Rp 35,000 Rp 26,250
Kepala tukang OH 0.075 Rp 40,000 Rp 3,000
Tenaga kerja Mandor OH 0.075 Rp 45,000 Rp 3,375

2.8 Memasang 1 m3 pondasi batu belah, campuran 1/4 PC : 1 KP : 4 PP Rp 292,375 Rp 70,125


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu belah 15 cm/20 cm m3 1.200 Rp 155,000 Rp 186,000
Portland Cement kg 41.000 Rp 1,000 Rp 41,000
Kapur padam m3 0.131 Rp - Rp -
Bahan Pasir Pasang m3 0.523 Rp 125,000 Rp 65,375
Pekerja OH 1.500 Rp 25,000 Rp 37,500
Tukang batu OH 0.750 Rp 35,000 Rp 26,250
Kepala tukang OH 0.075 Rp 40,000 Rp 3,000
Tenaga kerja Mandor OH 0.075 Rp 45,000 Rp 3,375

2.9 Memasang 1 m3 batu kosong (aanstamping) Rp 186,000 Rp 36,465


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu belah 15 cm/20 cm m3 1.200 Rp 155,000 Rp 186,000
Bahan Pasir urug m3 0.432 Rp - Rp -
Pekerja OH 0.780 Rp 25,000 Rp 19,500
Tukang batu OH 0.390 Rp 35,000 Rp 13,650
Kepala tukang OH 0.039 Rp 40,000 Rp 1,560
Tenaga kerja Mandor OH 0.039 Rp 45,000 Rp 1,755

2.10 Memasang 1 m3 pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu belah Rp 268,400 Rp 125,800
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu belah 15 cm/20 cm m3 0.480 Rp 155,000 Rp 74,400
Portland Cement kg 194.000 Rp 1,000 Rp 194,000
Pasir beton m3 0.312 Rp - Rp -
Koral Beton m3 0.468 Rp - Rp -
Besi beton kg 126.000 Rp - Rp -
Kawat beton kg 1.800 Rp - Rp -
Bahan
Pekerja OH 3.400 Rp 25,000 Rp 85,000
Tukang batu OH 0.850 Rp 35,000 Rp 29,750
Kepala tukang OH 0.085 Rp 40,000 Rp 3,400
Tenaga kerja Mandor OH 0.170 Rp 45,000 Rp 7,650

2.11 Memasang 1 m3 pondasi sumuran, diameter 100 cm Rp 263,750 Rp 96,555


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Batu belah 15 cm/20 cm m3 0.450 Rp 155,000 Rp 69,750
Portland Cement kg 194.000 Rp 1,000 Rp 194,000

Spesialis Infrastruktur NMC PNPM-MPd Page 140 of 289


Menghitung Harga Satuan Pekerjaan
Bahan

Pasir beton m3 0.312 Rp - Rp -


Koral Beton m3 0.468 Rp - Rp -
Tenaga kerja Pekerja OH 2.400 Rp 25,000 Rp 60,000
Tukang batu OH 0.800 Rp 35,000 Rp 28,000
Kepala tukang OH 0.080 Rp 40,000 Rp 3,200
Mandor OH 0.119 Rp 45,000 Rp 5,355

III. PEKERJAAN BETON


SNI 7394 - 2008
3.1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 2) cm, w/c = 0,87
± Rp 247,000 Rp 55,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 247.000 Rp 1,000 Rp 247,000
Pasir beton ( kg ) kg 869.000 Rp - Rp -
koral beton kg kg 999.000 Rp - Rp -
Bahan Air Liter 215.000 Rp - Rp -
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Kepala tukang OH 0.028 Rp 40,000 Rp 1,120
Tenaga kerja Mandor OH 0.083 Rp 45,000 Rp 3,735

3.2 Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 2) cm, w/c = 0,78
± Rp 276,000 Rp 55,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 276.000 Rp 1,000 Rp 276,000
Pasir beton ( kg ) kg 828.000 Rp - Rp -
koral beton kg kg 1,012.000 Rp - Rp -
Bahan Air Liter 215.000 Rp - Rp -
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Kepala tukang OH 0.028 Rp 40,000 Rp 1,120
Tenaga kerja Mandor OH 0.083 Rp 45,000 Rp 3,735

3.3 Membuat 1 m3 beton mutu f’c = 12,2 MPa (K 150), slump (12 2) cm, w/c = 0,72
± Rp 299,000 Rp 55,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 299.000 Rp 1,000 Rp 299,000
Pasir beton ( kg ) kg 799.000 Rp - Rp -
koral beton kg kg 1,017.000 Rp - Rp -
Bahan Air Liter 215.000 Rp - Rp -
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Kepala tukang OH 0.028 Rp 40,000 Rp 1,120
Tenaga kerja Mandor OH 0.083 Rp 45,000 Rp 3,735

CATATAN Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Bukling factor pasir = 20 %

Spesialis Infrastruktur NMC PNPM-MPd Page 141 of 289


Menghitung Harga Satuan Pekerjaan

3.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87 Rp 230,000 Rp 40,500
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 230.000 Rp 1,000 Rp 230,000
Pasir beton ( kg ) kg 893.000 Rp - Rp -
koral beton kg kg 1,027.000 Rp - Rp -
Bahan Air Liter 200.000 Rp - Rp -
Pekerja OH 1.200 Rp 25,000 Rp 30,000
Tukang batu OH 0.200 Rp 35,000 Rp 7,000
Kepala tukang OH 0.020 Rp 40,000 Rp 800
Tenaga kerja Mandor OH 0.060 Rp 45,000 Rp 2,700

3.5 Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66
± Rp 326,000 Rp 55,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 326.000 Rp 1,000 Rp 326,000
Pasir beton ( kg ) kg 760.000 Rp - Rp -
koral beton kg kg 1,029.000 Rp - Rp -
Bahan Air Liter 215.000 Rp - Rp -
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Kepala tukang OH 0.028 Rp 40,000 Rp 1,120
Tenaga kerja Mandor OH 0.083 Rp 45,000 Rp 3,735

3.6 Membuat 1 m3 beton mutu f’c = 16,9 MPa (K 200), slump (12 2) cm, w/c = 0,61
± Rp 352,000 Rp 55,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 352.000 Rp 1,000 Rp 352,000
Pasir beton ( kg ) kg 731.000 Rp - Rp -
koral beton kg kg 1,031.000 Rp - Rp -
Bahan Air Liter 215.000 Rp - Rp -
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Kepala tukang OH 0.028 Rp 40,000 Rp 1,120
Tenaga kerja Mandor OH 0.083 Rp 45,000 Rp 3,735

3.7 Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58
± Rp 371,000 Rp 55,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 371.000 Rp 1,000 Rp 371,000
Pasir beton ( kg ) kg 698.000 Rp - Rp -
koral beton kg kg 1,047.000 Rp - Rp -
Bahan Air Liter 215.000 Rp - Rp -
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Kepala tukang OH 0.028 Rp 40,000 Rp 1,120
Tenaga kerja Mandor OH 0.083 Rp 45,000 Rp 3,735

3.8 Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 2) cm, w/c = 0,56
± Rp 384,000 Rp 55,730

Spesialis Infrastruktur NMC PNPM-MPd Page 142 of 289


Menghitung Harga Satuan Pekerjaan

Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 384.000 Rp 1,000 Rp 384,000
Pasir beton ( kg ) kg 692.000 Rp - Rp -
koral beton kg kg 1,039.000 Rp - Rp -
Bahan Air Liter 215.000 Rp - Rp -
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Kepala tukang OH 0.028 Rp 40,000 Rp 1,120
Tenaga kerja Mandor OH 0.083 Rp 45,000 Rp 3,735

3.9 Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275), slump (12 2) cm, w/c = 0,53
± Rp 406,000 Rp 55,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 406.000 Rp 1,000 Rp 406,000
Pasir beton ( kg ) kg 684.000 Rp - Rp -
koral beton kg kg 1,026.000 Rp - Rp -
Bahan Air Liter 215.000 Rp - Rp -
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Kepala tukang OH 0.028 Rp 40,000 Rp 1,120
Tenaga kerja Mandor OH 0.083 Rp 45,000 Rp 3,735

3.10 Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 2) cm, w/c = 0,52
± Rp 413,000 Rp 55,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 413.000 Rp 1,000 Rp 413,000
Pasir beton m3 681.000 Rp - Rp -
Koral Beton m3 1,021.000 Rp - Rp -
Bahan Air Liter 215.000 Rp - Rp -
Pekerja OH 1.650 Rp 25,000 Rp 41,250
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Kepala tukang OH 0.028 Rp 40,000 Rp 1,120
Tenaga kerja Mandor OH 0.083 Rp 45,000 Rp 3,735

3.11 Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (12 2) cm, w/c = 0,49
± Rp 439,000 Rp 70,875
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 439.000 Rp 1,000 Rp 439,000
Pasir beton ( kg ) kg 670.000 Rp - Rp -
koral beton kg kg 1,006.000 Rp - Rp -
Bahan Air Liter 215.000 Rp - Rp -
Pekerja OH 2.100 Rp 25,000 Rp 52,500
Tukang batu OH 0.350 Rp 35,000 Rp 12,250
Kepala tukang OH 0.035 Rp 40,000 Rp 1,400
Tenaga kerja Mandor OH 0.105 Rp 45,000 Rp 4,725

3.12 Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (12 2) cm, w/c = 0,48
± Rp 448,000 Rp 70,875
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 448.000 Rp 1,000 Rp 448,000

Bahan Infrastruktur NMC PNPM-MPd


Spesialis Page 143 of 289
Menghitung Harga Satuan Pekerjaan

Pasir beton ( kg ) kg 667.000 Rp - Rp -


koral beton kg kg 1,000.000 Rp - Rp -
Bahan Air Liter 215.000 Rp - Rp -
Pekerja OH 2.100 Rp 25,000 Rp 52,500
Tukang batu OH 0.350 Rp 35,000 Rp 12,250
Kepala tukang OH 0.035 Rp 40,000 Rp 1,400
Tenaga kerja Mandor OH 0.105 Rp 45,000 Rp 4,725

3.13 Membuat 1 m3 beton kedap air dengan strorox – 100 Rp 400,000 Rp 70,875
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 400.000 Rp 1,000 Rp 400,000
Pasir beton m3 0.480 Rp - Rp -
Koral Beton m3 0.800 Rp - Rp -
Bahan Strorox – 100 kg 1.200 Rp - Rp -
Pekerja OH 2.100 Rp 25,000 Rp 52,500
Tukang batu OH 0.350 Rp 35,000 Rp 12,250
Kepala tukang OH 0.035 Rp 40,000 Rp 1,400
Tenaga kerja Mandor OH 0.105 Rp 45,000 Rp 4,725

3.14 Memasang 1 m’ PVC Waterstop lebar 150 mm Rp - Rp 1,755


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Waterstop lebar 150 mm m’ 1.050 Rp - Rp -
Pekerja OH 0.060 Rp 25,000 Rp 1,500
Tukang batu/pipa OH 0.030 Rp - Rp -
Kepala tukang OH 0.003 Rp 40,000 Rp 120
Tenaga kerja Mandor OH 0.003 Rp 45,000 Rp 135

3.15 Memasang 1 m’ PVC Waterstop lebar 200 mm Rp - Rp 2,225


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Waterstop lebar 200 mm m’ 1.050 Rp - Rp -
Pekerja OH 0.070 Rp 25,000 Rp 1,750
Tukang batu/pipa OH 0.035 Rp - Rp -
Kepala tukang OH 0.004 Rp 40,000 Rp 160
Tenaga kerja Mandor OH 0.007 Rp 45,000 Rp 315

3.16 Membuat 1 m’ PVC Waterstop lebar 230 mm – 320 mm Rp - Rp 2,340


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Waterstop m’ 1.050 Rp - Rp -
Bahan lebar 230 mm - 320 mm
Pekerja OH 0.080 Rp 25,000 Rp 2,000
Tukang batu/pipa OH 0.040 Rp - Rp -
Kepala tukang OH 0.004 Rp 40,000 Rp 160
Tenaga kerja Mandor OH 0.004 Rp 45,000 Rp 180

3.17 Pembesian 10 kg dengan besi polos atau besi ulir Rp - Rp 2,210


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Spesialis Infrastruktur NMC PNPM-MPd Page 144 of 289


Menghitung Harga Satuan Pekerjaan

Besi beton (polos/ulir) kg 10.500 Rp - Rp -


Bahan Kawat beton kg 0.150 Rp - Rp -
Pekerja OH 0.070 Rp 25,000 Rp 1,750
Tukang besi OH 0.070 Rp - Rp -
Kepala tukang OH 0.007 Rp 40,000 Rp 280
Tenaga kerja Mandor OH 0.004 Rp 45,000 Rp 180

3.18 Memasang 10 kg kabel presstressed polos/strands Rp - Rp 1,585


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Besi beton (polos/ulir) kg 10.500 Rp - Rp -
Bahan Kawat beton kg 0.100 Rp - Rp -
Pekerja OH 0.050 Rp 25,000 Rp 1,250
Tukang besi OH 0.050 Rp - Rp -
Kepala tukang OH 0.005 Rp 40,000 Rp 200
Tenaga kerja Mandor OH 0.003 Rp 45,000 Rp 135

3.19 Memasang 10 kg jaring kawat baja/wire mesh Rp - Rp 1,670


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Jaring kawat baja dilas kg 10.200 Rp - Rp -
Bahan Kawat beton kg 0.050 Rp - Rp -
Pekerja OH 0.025 Rp 25,000 Rp 625
Tukang besi OH 0.025 Rp - Rp -
Kepala tukang OH 0.025 Rp 40,000 Rp 1,000
Tenaga kerja Mandor OH 0.001 Rp 45,000 Rp 45

3.20 Memasang 1 m2 bekisting untuk pondasi Rp - Rp 15,210


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 ### Rp - Rp -
Paku 5 cm – 10 cm kg ### Rp - Rp -
Bahan Minyak bekisting Liter ### Rp - Rp -
Pekerja OH ### Rp 25,000 Rp 13,000
Tukang kayu OH ### Rp - Rp -
Kepala tukang OH ### Rp 40,000 Rp 1,040
Tenaga kerja Mandor OH ### Rp 45,000 Rp 1,170

3.21 Memasang 1 m2 bekisting untuk sloof Rp - Rp 15,210


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 ### Rp - Rp -
Paku 5 cm – 10 cm kg ### Rp - Rp -
Bahan Minyak bekisting Liter ### Rp - Rp -
Pekerja OH ### Rp 25,000 Rp 13,000
Tukang kayu OH ### Rp - Rp -
Kepala tukang OH ### Rp 40,000 Rp 1,040
Tenaga kerja Mandor OH ### Rp 45,000 Rp 1,170

3.22 Memasang 1 m2 bekisting untuk kolom Rp - Rp 19,305


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Spesialis Infrastruktur NMC PNPM-MPd Page 145 of 289


Menghitung Harga Satuan Pekerjaan

Kayu kelas III m3 ### Rp - Rp -


Paku 5 cm – 12 cm kg ### Rp - Rp -
Minyak bekisting Liter ### Rp - Rp -
Balok kayu kelas II m3 ### Rp - Rp -
Plywood tebal 9 mm Lbr ### Rp - Rp -
Dolken kayu galam, Batang 2.000 Rp - Rp -
Bahan φ (8–10) cm, panjang 4 m
Pekerja OH ### Rp 25,000 Rp 16,500
Tukang kayu OH ### Rp - Rp -
Kepala tukang OH ### Rp 40,000 Rp 1,320
Tenaga kerja Mandor OH ### Rp 45,000 Rp 1,485

3.23 Memasang 1 m2 bekisting untuk balok Rp - Rp 19,305


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 ### Rp - Rp -
Paku 5 cm – 12 cm kg ### Rp - Rp -
Minyak bekisting Liter ### Rp - Rp -
Balok kayu kelas II m3 ### Rp - Rp -
Plywood tebal 9 mm Lbr ### Rp - Rp -
Dolken kayu galam, Rp - Rp -
Bahan φ (8-10) cm, panjang 4 m Batang ###
Pekerja OH ### Rp 25,000 Rp 16,500
Tukang kayu OH ### Rp - Rp -
Kepala tukang OH ### Rp 40,000 Rp 1,320
Tenaga kerja Mandor OH ### Rp 45,000 Rp 1,485

3.24 Memasang 1 m2 bekisting untuk lantai Rp - Rp 19,305


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 ### Rp - Rp -
Paku 5 cm – 12 cm kg ### Rp - Rp -
Minyak bekisting Liter ### Rp - Rp -
Balok kayu kelas II m3 ### Rp - Rp -
Plywood tebal 9 mm Lbr ### Rp - Rp -
Dolken kayu galam, (8-10) cm,
ö

Rp -
Bahan panjang 4 m Batang ### Rp -
Pekerja OH ### Rp 25,000 Rp 16,500
Tukang kayu OH ### Rp - Rp -
Kepala tukang OH ### Rp 40,000 Rp 1,320
Tenaga kerja Mandor OH ### Rp 45,000 Rp 1,485

3.25 Memasang 1 m2 bekisting untuk dinding Rp - Rp 19,305


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.030 Rp - Rp -
Paku 5 cm – 12 cm kg 0.400 Rp - Rp -
Minyak bekisting Liter 0.200 Rp - Rp -
Balok kayu kelas II m3 0.020 Rp - Rp -

Spesialis Infrastruktur NMC PNPM-MPd Page 146 of 289

Bahan
Menghitung Harga Satuan Pekerjaan

Plywood tebal 9 mm Lbr 0.350 Rp - Rp -


Dolken kayu galam, (8-10) cm,
ö

Rp -
panjang 4 m Batang 3.000 Rp -
Formite/penjaga jarak
Rp -
Bahan bekisting/spacer Buah 4.000 Rp -
Pekerja OH 0.660 Rp 25,000 Rp 16,500
Tukang kayu OH 0.330 Rp - Rp -
Kepala tukang OH 0.033 Rp 40,000 Rp 1,320
Tenaga kerja Mandor OH 0.033 Rp 45,000 Rp 1,485

3.26 Memasang 1 m2 bekisting untuk tangga Rp - Rp 19,305


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 ### Rp - Rp -
Paku 5 cm – 12 cm kg ### Rp - Rp -
Minyak bekisting Liter ### Rp - Rp -
Balok kayu kelas II m3 ### Rp - Rp -
Plywood tebal 9 mm Lbr ### Rp - Rp -
Dolken kayu galam, (8-10) cm,
ö

Rp -
Bahan panjang 4 m Batang ### Rp -
Pekerja OH ### Rp 25,000 Rp 16,500
Tukang kayu OH ### Rp - Rp -
Kepala tukang OH ### Rp 40,000 Rp 1,320
Tenaga kerja Mandor OH ### Rp 45,000 Rp 1,485

3.27 Memasang 1 m2 jembatan untuk pengecoran beton Rp - Rp 4,310


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III (papan) m3 0.026 Rp - Rp -
Paku 5 cm – 12 cm kg 0.600 Rp - Rp -
Dolken kayu galam (kaso), (8-10)ö

Rp -
Bahan cm, panjang 4 m Batang 0.500 Rp -
Pekerja OH 0.150 Rp 25,000 Rp 3,750
Tukang kayu OH 0.050 Rp - Rp -
Kepala tukang OH 0.005 Rp 40,000 Rp 200
Tenaga kerja Mandor OH 0.008 Rp 45,000 Rp 360

3.28 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting) Rp 336,000 Rp 164,530
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.200 Rp - Rp -
Paku 5 cm – 12 cm kg 1.500 Rp - Rp -
Minyak bekisting Liter 0.400 Rp - Rp -
Besi beton polos kg 157.500 Rp - Rp -
Kawat beton kg 2.250 Rp - Rp -
Portland Cement kg 336.000 Rp 1,000 Rp 336,000
Pasir beton m3 0.540 Rp - Rp -
Bahan Koral Beton m3 0.810 Rp - Rp -
Pekerja OH 5.300 Rp 25,000 Rp 132,500

Spesialis Infrastruktur NMC PNPM-MPd Page 147 of 289

Tenaga kerja
Menghitung Harga Satuan Pekerjaan

Tukang batu OH 0.275 Rp 35,000 Rp 9,625


Tukang kayu OH 1.300 Rp - Rp -
Tukang besi OH 1.050 Rp - Rp -
Kepala tukang OH 0.262 Rp 40,000 Rp 10,480
Tenaga kerja Mandor OH 0.265 Rp 45,000 Rp 11,925

3.29 Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting) Rp 336,000 Rp 176,530
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.270 Rp - Rp -
Paku 5 cm-12cm kg 2.000 Rp - Rp -
Minyak bekisting Liter 0.600 Rp - Rp -
Besi beton polos kg 210.000 Rp - Rp -
Kawat beton kg 3.000 Rp - Rp -
Portland Cement kg 336.000 Rp 1,000 Rp 336,000
Plywood 9 mm Lembar 3.500 Rp - Rp -
Pasir beton m3 0.540 Rp - Rp -
Bahan Koral Beton m3 0.810 Rp - Rp -
Pekerja OH 5.650 Rp 25,000 Rp 141,250
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Tukang kayu OH 1.560 Rp - Rp -
Tukang besi OH 1.400 Rp - Rp -
Kepala tukang OH 0.323 Rp 40,000 Rp 12,920
Tenaga kerja Mandor OH 0.283 Rp 45,000 Rp 12,735

3.30 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting) Rp 336,000 Rp 217,880
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.400 Rp - Rp -
Paku 5 cm – 12 cm kg 4.000 Rp - Rp -
Minyak bekisting Liter 2.000 Rp - Rp -
Besi beton polos kg 315.000 Rp - Rp -
Kawat beton kg 4.500 Rp - Rp -
Portland Cement kg 336.000 Rp 1,000 Rp 336,000
Pasir beton m3 0.540 Rp - Rp -
Koral Beton m3 0.810 Rp - Rp -
Kayu kelas II balok m3 0.150 Rp - Rp -
Plywood 9 mm Lembar 3.500 Rp - Rp -
Dolken kayu galam, (8-10) cm,
ö

Rp -
Bahan panjang 4 m Batang 20.000 Rp -
Pekerja OH 7.050 Rp 25,000 Rp 176,250
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Tukang kayu OH 1.650 Rp - Rp -
Tukang besi OH 2.100 Rp - Rp -
Kepala tukang OH 0.403 Rp 40,000 Rp 16,120
Tenaga kerja Mandor OH 0.353 Rp 45,000 Rp 15,885

3.31 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting) Rp 336,000 Rp 196,005

Spesialis Infrastruktur NMC PNPM-MPd Page 148 of 289


Menghitung Harga Satuan Pekerjaan

Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.320 Rp - Rp -
Paku 5 cm – 12 cm kg 3.200 Rp - Rp -
Minyak bekisting Liter 1.600 Rp - Rp -
Besi beton polos kg 210.000 Rp - Rp -
Kawat beton kg 3.000 Rp - Rp -
Portland Cement kg 336.000 Rp 1,000 Rp 336,000
Pasir beton m3 0.540 Rp - Rp -
Koral Beton m3 0.810 Rp - Rp -
Kayu kelas II balok m3 0.140 Rp - Rp -
Plywood 9 mm Lembar 2.800 Rp - Rp -
Dolken kayu galam, (8-10) cm,
ö

Rp -
Bahan panjang 4 m Batang 16.000 Rp -
Pekerja OH 6.350 Rp 25,000 Rp 158,750
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Tukang kayu OH 1.650 Rp - Rp -
Tukang besi OH 1.400 Rp - Rp -
Kepala tukang OH 0.333 Rp 40,000 Rp 13,320
Tenaga kerja Mandor OH 0.318 Rp 45,000 Rp 14,310

3.32 Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting) Rp 336,000 Rp 164,650
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.320 Rp - Rp -
Paku 5 cm – 12 cm kg 3.200 Rp - Rp -
Minyak bekisting Liter 1.600 Rp - Rp -
Besi beton polos kg 157.500 Rp - Rp -
Kawat beton kg 2.250 Rp - Rp -
Portland Cement kg 336.000 Rp 1,000 Rp 336,000
Pasir beton m3 0.540 Rp - Rp -
Koral Beton m3 0.810 Rp - Rp -
Kayu kelas II balok m3 0.120 Rp - Rp -
Plywood 9 mm Lembar 2.800 Rp - Rp -
Dolken kayu galam, (8-10) cm,ö

Rp -
Bahan panjang 4 m Batang 32.000 Rp -
Pekerja OH 5.300 Rp 25,000 Rp 132,500
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Tukang kayu OH 1.300 Rp - Rp -
Tukang besi OH 1.050 Rp - Rp -
Kepala tukang OH 0.265 Rp 40,000 Rp 10,600
Tenaga kerja Mandor OH 0.265 Rp 45,000 Rp 11,925

3.33 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) Rp 336,000 Rp 164,530
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.240 Rp - Rp -
Paku 5 cm – 12 cm kg 3.200 Rp - Rp -
Minyak bekisting Liter 1.600 Rp - Rp -

Spesialis Infrastruktur NMC PNPM-MPd Page 149 of 289


Menghitung Harga Satuan Pekerjaan

Besi beton polos kg 157.500 Rp - Rp -


Kawat beton kg 2.250 Rp - Rp -
Portland Cement kg 336.000 Rp 1,000 Rp 336,000
Pasir beton m3 0.540 Rp - Rp -
Koral Beton m3 0.810 Rp - Rp -
Kayu kelas II balok m3 0.160 Rp - Rp -
Plywood 9 mm Lembar 2.800 Rp - Rp -
Dolken kayu galam, (8-10) cm,
ö

Rp -
Bahan panjang 4 m Batang 24.000 Rp -
Pekerja OH 5.300 Rp 25,000 Rp 132,500
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Tukang kayu OH 1.300 Rp - Rp -
Tukang besi OH 1.050 Rp - Rp -
Kepala tukang OH 0.262 Rp 40,000 Rp 10,480
Tenaga kerja Mandor OH 0.265 Rp 45,000 Rp 11,925

3.34 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting) Rp 336,000 Rp 176,530
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 0.250 Rp - Rp -
Paku 5 cm – 12 cm kg 3.000 Rp - Rp -
Minyak bekisting Liter 1.200 Rp - Rp -
Besi beton polos kg 210.000 Rp - Rp -
Kawat beton kg 3.000 Rp - Rp -
Portland Cement kg 336.000 Rp 1,000 Rp 336,000
Pasir beton m3 0.540 Rp - Rp -
Koral Beton m3 0.810 Rp - Rp -
Kayu kelas II balok m3 0.105 Rp - Rp -
Plywood 9 mm Lembar 2.500 Rp - Rp -
Dolken kayu galam, (8-10) cm,
ö

Rp -
Bahan panjang 4 m Batang 14.000 Rp -
Pekerja OH 5.650 Rp 25,000 Rp 141,250
Tukang batu OH 0.275 Rp 35,000 Rp 9,625
Tukang kayu OH 1.560 Rp - Rp -
Tukang besi OH 1.400 Rp - Rp -
Kepala tukang OH 0.323 Rp 40,000 Rp 12,920
Tenaga kerja Mandor OH 0.283 Rp 45,000 Rp 12,735

3.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm Rp 4,000 Rp 5,845
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 ### Rp - Rp -
Paku 5 cm – 12 cm kg ### Rp - Rp -
Minyak bekisting Liter Rp - Rp -
Besi beton polos kg ### Rp - Rp -
Kawat beton kg ### Rp - Rp -
Portland Cement kg ### Rp 1,000 Rp 4,000
Pasir beton m3 ### Rp - Rp -
Bahan
Spesialis Infrastruktur NMC PNPM-MPd Page 150 of 289
Menghitung Harga Satuan Pekerjaan

Bahan Koral Beton m3 ### Rp - Rp -


Pekerja OH ### Rp 25,000 Rp 4,500
Tukang batu OH ### Rp 35,000 Rp 700
Tukang kayu OH ### Rp - Rp -
Tukang besi OH ### Rp - Rp -
Kepala tukang OH ### Rp 40,000 Rp 240
Tenaga kerja Mandor OH ### Rp 45,000 Rp 405

3.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm Rp 5,500 Rp 9,655
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas III m3 ### Rp - Rp -
Paku 5 cm – 12 cm kg ### Rp - Rp -
Minyak bekisting Liter Rp - Rp -
Besi beton polos kg ### Rp - Rp -
Kawat beton kg ### Rp - Rp -
Portland Cement kg ### Rp 1,000 Rp 5,500
Pasir beton m3 ### Rp - Rp -
Bahan Koral Beton m3 ### Rp - Rp -
Pekerja OH ### Rp 25,000 Rp 7,425
Tukang batu OH ### Rp 35,000 Rp 1,155
Tukang kayu OH ### Rp - Rp -
Tukang besi OH ### Rp - Rp -
Kepala tukang OH ### Rp 40,000 Rp 400
Tenaga kerja Mandor OH ### Rp 45,000 Rp 675

IV. PEKERJAAN DINDING


SNI 6897 - 2008

4.1 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 2 PP Rp 53,500 Rp 24,150
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 140.000 Rp - Rp -
Portland Cement kg 43.500 Rp 1,000 Rp 43,500
Bahan Pasir Pasang m3 0.080 Rp 125,000 Rp 10,000
Pekerja OH 0.600 Rp 25,000 Rp 15,000
Tukang batu OH 0.200 Rp 35,000 Rp 7,000
Kepala tukang OH 0.020 Rp 40,000 Rp 800
Tenaga kerja Mandor OH 0.030 Rp 45,000 Rp 1,350

4.2 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 PP Rp 44,325 Rp 24,150
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 140.000 Rp - Rp -
Portland Cement kg 32.950 Rp 1,000 Rp 32,950
Bahan Pasir Pasang m3 0.091 Rp 125,000 Rp 11,375
Pekerja OH 0.600 Rp 25,000 Rp 15,000
Tukang batu OH 0.200 Rp 35,000 Rp 7,000

Tenaga kerja
Spesialis Infrastruktur NMC PNPM-MPd Page 151 of 289
Menghitung Harga Satuan Pekerjaan

Kepala tukang OH 0.020 Rp 40,000 Rp 800


Tenaga kerja Mandor OH 0.030 Rp 45,000 Rp 1,350

4.3 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4 PP Rp 38,175 Rp 24,150
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 140.000 Rp - Rp -
Portland Cement kg 26.550 Rp 1,000 Rp 26,550
Bahan Pasir Pasang m3 0.093 Rp 125,000 Rp 11,625
Pekerja OH 0.600 Rp 25,000 Rp 15,000
Tukang batu OH 0.200 Rp 35,000 Rp 7,000
Kepala tukang OH 0.020 Rp 40,000 Rp 800
Tenaga kerja Mandor OH 0.030 Rp 45,000 Rp 1,350

4.4 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 5 PP Rp 34,950 Rp 24,150
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 140.000 Rp - Rp -
Portland Cement kg 22.200 Rp 1,000 Rp 22,200
Bahan Pasir Pasang m3 0.102 Rp 125,000 Rp 12,750
Pekerja OH 0.600 Rp 25,000 Rp 15,000
Tukang batu OH 0.200 Rp 35,000 Rp 7,000
Kepala tukang OH 0.020 Rp 40,000 Rp 800
Tenaga kerja Mandor OH 0.030 Rp 45,000 Rp 1,350

4.5 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 6 PP Rp 33,750 Rp 24,150
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 140.000 Rp - Rp -
Portland Cement kg 18.500 Rp 1,000 Rp 18,500
Bahan Pasir Pasang m3 0.122 Rp 125,000 Rp 15,250
Pekerja OH 0.600 Rp 25,000 Rp 15,000
Tukang batu OH 0.200 Rp 35,000 Rp 7,000
Kepala tukang OH 0.020 Rp 40,000 Rp 800
Tenaga kerja Mandor OH 0.030 Rp 45,000 Rp 1,350

4.6 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3 KP : 10 PP Rp 21,643 Rp 24,150
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 140.000 Rp - Rp -
Portland Cement kg 10.080 Rp 1,000 Rp 10,080
Pasir Pasang m3 0.093 Rp 125,000 Rp 11,563
Bahan Kapur padam m3 0.028 Rp - Rp -
Pekerja OH 0.600 Rp 25,000 Rp 15,000
Tukang batu OH 0.200 Rp 35,000 Rp 7,000
Kepala tukang OH 0.020 Rp 40,000 Rp 800
Tenaga kerja Mandor OH 0.030 Rp 45,000 Rp 1,350

4.7 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 2 PP Rp 23,700 Rp 12,075
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp - Rp -

Bahan
Spesialis Infrastruktur NMC PNPM-MPd Page 152 of 289
Menghitung Harga Satuan Pekerjaan

Portland Cement kg 18.950 Rp 1,000 Rp 18,950


Bahan Pasir Pasang m3 0.038 Rp 125,000 Rp 4,750
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 35,000 Rp 3,500
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675

4.8 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 3 PP Rp 19,370 Rp 12,075
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp - Rp -
Portland Cement kg 14.370 Rp 1,000 Rp 14,370
Bahan Pasir Pasang m3 0.040 Rp 125,000 Rp 5,000
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 35,000 Rp 3,500
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675

4.9 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 4 PP Rp 16,875 Rp 12,075
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp - Rp -
Portland Cement kg 11.500 Rp 1,000 Rp 11,500
Bahan Pasir Pasang m3 0.043 Rp 125,000 Rp 5,375
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 35,000 Rp 3,500
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675

4.10 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 5 PP Rp 15,305 Rp 12,075
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp - Rp -
Portland Cement kg 9.680 Rp 1,000 Rp 9,680
Bahan Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 35,000 Rp 3,500
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675

4.11 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 6 PP Rp 14,445 Rp 12,075
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp - Rp -
Portland Cement kg 8.320 Rp 1,000 Rp 8,320
Bahan Pasir Pasang m3 0.049 Rp 125,000 Rp 6,125
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 35,000 Rp 3,500
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675

Spesialis Infrastruktur NMC PNPM-MPd Page 153 of 289


Menghitung Harga Satuan Pekerjaan

4.12 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) tebal 1/2 bata, campuran spesi 1 PC : 8 PP Rp 12,750 Rp 12,075
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp - Rp -
Portland Cement kg 6.500 Rp 1,000 Rp 6,500
Bahan Pasir Pasang m3 0.050 Rp 125,000 Rp 6,250
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 35,000 Rp 3,500
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675

4.13 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 3 KP : 10 PP Rp 10,750 Rp 12,075
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp - Rp -
Portland Cement kg 4.500 Rp 1,000 Rp 4,500
Pasir Pasang m3 0.050 Rp 125,000 Rp 6,250
Bahan Kapur padam m3 0.015 Rp - Rp -
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 35,000 Rp 3,500
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675

4.14 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 KP : 1 SM : 1 PP Rp 2,250 Rp 12,075
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp - Rp -
Semen Merah m3 0.018 Rp - Rp -
Pasir Pasang m3 0.018 Rp 125,000 Rp 2,250
Bahan Kapur padam m3 0.018 Rp - Rp -
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 35,000 Rp 3,500
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675

4.15 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 KP : 1 SM : 2 PP Rp 3,500 Rp 12,075
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah Buah 70.000 Rp - Rp -
Semen Merah m3 0.014 Rp - Rp -
Pasir Pasang m3 0.028 Rp 125,000 Rp 3,500
Bahan Kapur padam m3 0.014 Rp - Rp -
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 35,000 Rp 3,500
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675

4.16 Memasang 1 m2 dinding HB 20 , campuran spesi 1 PC : 3 PP Rp 121,320 Rp 14,025


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Hollow Block 20 Buah 12.500 Rp - Rp -

Bahan Infrastruktur NMC PNPM-MPd


Spesialis Page 154 of 289
Menghitung Harga Satuan Pekerjaan

Portland Cement kg 30.320 Rp 1,000 Rp 30,320


Pasir Pasang m3 0.728 Rp 125,000 Rp 91,000
Bahan Besi angkur =8 mm
ö kg 0.280 Rp - Rp -
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 35,000 Rp 5,250
Kepala tukang OH 0.015 Rp 40,000 Rp 600
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675

4.17 Memasang 1 m2 dinding HB 20, cam puran spesi 1 PC : 4 PP Rp 120,760 Rp 14,025


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Hollow Block 20 Buah 12.500 Rp - Rp -
Portland Cement kg 24.260 Rp 1,000 Rp 24,260
Pasir Pasang m3 0.772 Rp 125,000 Rp 96,500
Bahan Besi angkur =8 mm
ö kg 0.280 Rp - Rp -
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 35,000 Rp 5,250
Kepala tukang OH 0.015 Rp 40,000 Rp 600
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675

4.18 Memasang 1 m2 dinding HB 15, campuran spesi 1 PC : 3 PP Rp 91,490 Rp 14,490


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Hollow Block 15 Buah 12.500 Rp - Rp -
Portland Cement kg 22.740 Rp 1,000 Rp 22,740
Pasir Pasang m3 0.550 Rp 125,000 Rp 68,750
Bahan Besi angkur =8 mm
ö kg 0.280 Rp - Rp -
Pekerja OH 0.360 Rp 25,000 Rp 9,000
Tukang batu OH 0.120 Rp 35,000 Rp 4,200
Kepala tukang OH 0.012 Rp 40,000 Rp 480
Tenaga kerja Mandor OH 0.018 Rp 45,000 Rp 810

4.19 Memasang 1 m2 dinding HB 15, campuran spesi 1 PC : 4 PP Rp 90,950 Rp 14,490


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Hollow Block 15 Buah 12.500 Rp - Rp -
Portland Cement kg 18.200 Rp 1,000 Rp 18,200
Pasir Pasang m3 0.582 Rp 125,000 Rp 72,750
Bahan Besi angkur =8 mm
ö kg 0.280 Rp - Rp -
Pekerja OH 0.360 Rp 25,000 Rp 9,000
Tukang batu OH 0.120 Rp 35,000 Rp 4,200
Kepala tukang OH 0.012 Rp 40,000 Rp 480
Tenaga kerja Mandor OH 0.018 Rp 45,000 Rp 810

4.20 Memasang 1 m2 dinding HB 10, campuran spesi 1 PC : 3 PP Rp 60,660 Rp 12,075


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Hollow Block 10 Buah 12.500 Rp - Rp -
Portland Cement kg 15.160 Rp 1,000 Rp 15,160
Pasir Pasang m3 0.364 Rp 125,000 Rp 45,500
Bahan Besi angkur =8 mm
ö kg 0.280 Rp - Rp -

Spesialis Infrastruktur NMC PNPM-MPd Page 155 of 289


Menghitung Harga Satuan Pekerjaan

Pekerja OH 0.300 Rp 25,000 Rp 7,500


Tukang batu OH 0.100 Rp 35,000 Rp 3,500
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675

4.21 Memasang 1 m2 dinding HB 10, campuran spesi 1 PC : 4 PP Rp 60,630 Rp 12,075


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Hollow Block 10 Buah 12.500 Rp - Rp -
Portland Cement kg 12.130 Rp 1,000 Rp 12,130
Pasir Pasang m3 0.388 Rp 125,000 Rp 48,500
Bahan Besi angkur =8 mm
ö kg 0.280 Rp - Rp -
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 35,000 Rp 3,500
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675

4.22 Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 3 PP Rp 18,000 Rp 12,075
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Terawang (roster) Buah 30.000 Rp - Rp -
Portland Cement kg 14.000 Rp 1,000 Rp 14,000
Bahan Pasir Pasang m3 0.032 Rp 125,000 Rp 4,000
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 35,000 Rp 3,500
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675

4.23 Memasang 1 m2 dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 4 PP Rp 15,375 Rp 12,075
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Terawang (roster) Buah 30.000 Rp - Rp -
Portland Cement kg 11.000 Rp 1,000 Rp 11,000
Bahan Pasir Pasang m3 0.035 Rp 125,000 Rp 4,375
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 35,000 Rp 3,500
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675

4.24 Memasang 1 m2 dinding bata berongga ekspose ukuran (5 x 11 x 24) cm, campuran spesi 1 PC : 3 PP Rp 18,000 Rp 14,025
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata berongga ekspose Buah 70.000 Rp - Rp -
Portland Cement kg 14.000 Rp 1,000 Rp 14,000
Bahan Pasir Pasang m3 0.032 Rp 125,000 Rp 4,000
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 35,000 Rp 5,250
Kepala tukang OH 0.015 Rp 40,000 Rp 600
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675

Spesialis Infrastruktur NMC PNPM-MPd Page 156 of 289


Menghitung Harga Satuan Pekerjaan

V. PEKERJAAN PLESTERAN
SNI DT 91 -0010-2007

5.1 Memasang 1 m2 plesteran 1 PC : 1 PP, tebal 15 mm Rp 17,504 Rp 14,025


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 15.504 Rp 1,000 Rp 15,504
Bahan Pasir Pasang m3 0.016 Rp 125,000 Rp 2,000
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 35,000 Rp 5,250
Kepala tukang OH 0.015 Rp 40,000 Rp 600
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675

5.2 Memasang 1 m2 plesteran 1 PC : 2 PP, tebal 15 mm Rp 12,724 Rp 14,025


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 10.224 Rp 1,000 Rp 10,224
Bahan Pasir Pasang m3 0.020 Rp 125,000 Rp 2,500
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 35,000 Rp 5,250
Kepala tukang OH 0.015 Rp 40,000 Rp 600
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675

5.3 Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 15 mm Rp 10,651 Rp 14,025


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 7.776 Rp 1,000 Rp 7,776
Bahan Pasir Pasang m3 0.023 Rp 125,000 Rp 2,875
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 35,000 Rp 5,250
Kepala tukang OH 0.015 Rp 40,000 Rp 600
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675

5.4 Memasang 1 m2 plesteran 1 PC : 4 PP, tebal 15 mm Rp 9,240 Rp 14,025


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 6.240 Rp 1,000 Rp 6,240
Bahan Pasir Pasang m3 0.024 Rp 125,000 Rp 3,000
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 35,000 Rp 5,250
Kepala tukang OH 0.015 Rp 40,000 Rp 600
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675

5.5 Memasang 1 m2 plesteran 1 PC : 5 PP, tebal 15 mm Rp 8,434 Rp 14,025


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 5.184 Rp 1,000 Rp 5,184
Bahan Pasir Pasang m3 0.026 Rp 125,000 Rp 3,250
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 35,000 Rp 5,250
Kepala tukang OH 0.015 Rp 40,000 Rp 600
Tenaga kerja

Spesialis Infrastruktur NMC PNPM-MPd Page 157 of 289


Menghitung Harga Satuan Pekerjaan

Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675

5.6 Memasang 1 m2 plesteran 1 PC : 6 PP, tebal 15 mm Rp 7,791 Rp 14,025


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 4.416 Rp 1,000 Rp 4,416
Bahan Pasir Pasang m3 0.027 Rp 125,000 Rp 3,375
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 35,000 Rp 5,250
Kepala tukang OH 0.015 Rp 40,000 Rp 600
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675

5.7 Memasang 1 m2 plesteran 1 PC : 7 PP, tebal 15 mm Rp 7,436 Rp 14,025


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 3.936 Rp 1,000 Rp 3,936
Bahan Pasir Pasang m3 0.028 Rp 125,000 Rp 3,500
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 35,000 Rp 5,250
Kepala tukang OH 0.015 Rp 40,000 Rp 600
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675

5.8 Memasang 1 m2 plesteran 1 PC : 8 PP, tebal 15 mm Rp 7,081 Rp 14,025


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 3.456 Rp 1,000 Rp 3,456
Bahan Pasir Pasang m3 0.029 Rp 125,000 Rp 3,625
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 35,000 Rp 5,250
Kepala tukang OH 0.015 Rp 40,000 Rp 600
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675

5.9 Memasang 1 m2 plesteran 1 PC : 1/2 KP : 3 PP, tebal 15 mm Rp 7,385 Rp 14,490


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 5.760 Rp 1,000 Rp 5,760
Kapur padam m3 0.003 Rp - Rp -
Bahan Pasir Pasang m3 0.013 Rp 125,000 Rp 1,625
Pekerja OH 0.360 Rp 25,000 Rp 9,000
Tukang batu OH 0.120 Rp 35,000 Rp 4,200
Kepala tukang OH 0.012 Rp 40,000 Rp 480
Tenaga kerja Mandor OH 0.018 Rp 45,000 Rp 810

5.10 Memasang 1 m2 plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm Rp 5,500 Rp 14,490


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 3.000 Rp 1,000 Rp 3,000
Kapur padam m3 0.005 Rp - Rp -
Bahan Pasir Pasang m3 0.020 Rp 125,000 Rp 2,500
Pekerja OH 0.360 Rp 25,000 Rp 9,000
Tukang batu OH 0.120 Rp 35,000 Rp 4,200

Tenaga kerja
Spesialis Infrastruktur NMC PNPM-MPd Page 158 of 289
Menghitung Harga Satuan Pekerjaan

Kepala tukang OH 0.012 Rp 40,000 Rp 480


Tenaga kerja Mandor OH 0.018 Rp 45,000 Rp 810

5.11 memasang 1 m2 plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm Rp 1,125 Rp 14,490


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Semen Merah m3 0.009 Rp - Rp -
Kapur padam m3 0.009 Rp - Rp -
Bahan Pasir Pasang m3 0.009 Rp 125,000 Rp 1,125
Pekerja OH 0.360 Rp 25,000 Rp 9,000
Tukang batu OH 0.120 Rp 35,000 Rp 4,200
Kepala tukang OH 0.012 Rp 40,000 Rp 480
Tenaga kerja Mandor OH 0.018 Rp 45,000 Rp 810

5.12 Memasang 1 m2 plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm Rp 1,875 Rp 14,490


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Semen Merah m3 0.007 Rp - Rp -
Kapur padam m3 0.007 Rp - Rp -
Bahan Pasir Pasang m3 0.015 Rp 125,000 Rp 1,875
Pekerja OH 0.360 Rp 25,000 Rp 9,000
Tukang batu OH 0.120 Rp 35,000 Rp 4,200
Kepala tukang OH 0.012 Rp 40,000 Rp 480
Tenaga kerja Mandor OH 0.018 Rp 45,000 Rp 810

5.13 Memasang 1 m2 plesteran 1 PC : 2 PP, tebal 20 mm Rp 17,007 Rp 18,790


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 13.632 Rp 1,000 Rp 13,632
Bahan Pasir Pasang m3 0.027 Rp 125,000 Rp 3,375
Pekerja OH 0.400 Rp 25,000 Rp 10,000
Tukang batu OH 0.200 Rp 35,000 Rp 7,000
Kepala tukang OH 0.020 Rp 40,000 Rp 800
Tenaga kerja Mandor OH 0.022 Rp 45,000 Rp 990

5.14 Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 20 mm Rp 14,243 Rp 14,885


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 10.368 Rp 1,000 Rp 10,368
Bahan Pasir Pasang m3 0.031 Rp 125,000 Rp 3,875
Pekerja OH 0.260 Rp 25,000 Rp 6,500
Tukang batu OH 0.200 Rp 35,000 Rp 7,000
Kepala tukang OH 0.020 Rp 40,000 Rp 800
Tenaga kerja Mandor OH 0.013 Rp 45,000 Rp 585

5.15 Memasang 1 m2 plesteran 1 PC : 4 PP, tebal 20 mm Rp 12,320 Rp 18,790


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 8.320 Rp 1,000 Rp 8,320
Bahan Pasir Pasang m3 0.032 Rp 125,000 Rp 4,000
Pekerja OH 0.400 Rp 25,000 Rp 10,000

TenagaInfrastruktur
Spesialis kerja NMC PNPM-MPd Page 159 of 289
Menghitung Harga Satuan Pekerjaan

Tukang batu OH 0.200 Rp 35,000 Rp 7,000


Kepala tukang OH 0.020 Rp 40,000 Rp 800
Tenaga kerja Mandor OH 0.022 Rp 45,000 Rp 990

5.16 Memasang 1 m2 plesteran 1 PC : 5 PP, tebal 20 mm Rp 11,287 Rp 18,790


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 6.912 Rp 1,000 Rp 6,912
Bahan Pasir Pasang m3 0.035 Rp 125,000 Rp 4,375
Pekerja OH 0.400 Rp 25,000 Rp 10,000
Tukang batu OH 0.200 Rp 35,000 Rp 7,000
Kepala tukang OH 0.020 Rp 40,000 Rp 800
Tenaga kerja Mandor OH 0.022 Rp 45,000 Rp 990

5.17 Memasang 1 m2 plesteran 1 PC : 6 PP, tebal 20 mm Rp 10,388 Rp 18,790


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 5.888 Rp 1,000 Rp 5,888
Bahan Pasir Pasang m3 0.036 Rp 125,000 Rp 4,500
Pekerja OH 0.400 Rp 25,000 Rp 10,000
Tukang batu OH 0.200 Rp 35,000 Rp 7,000
Kepala tukang OH 0.020 Rp 40,000 Rp 800
Tenaga kerja Mandor OH 0.022 Rp 45,000 Rp 990

5.18 Memasang 1 m2 plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm Rp 2,250 Rp 20,570


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Semen Merah m3 0.009 Rp - Rp -
Kapur padam m3 0.009 Rp - Rp -
Bahan Pasir Pasang m3 0.018 Rp 125,000 Rp 2,250
Pekerja OH 0.440 Rp 25,000 Rp 11,000
Tukang batu OH 0.220 Rp 35,000 Rp 7,700
Kepala tukang OH 0.022 Rp 40,000 Rp 880
Tenaga kerja Mandor OH 0.022 Rp 45,000 Rp 990

5.19 Memasang 1 m2 Berapen 1 PC : 5 PP, tebal 15 mm Rp 8,434 Rp 7,055


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 5.184 Rp 1,000 Rp 5,184
Bahan Pasir Pasang m3 0.026 Rp 125,000 Rp 3,250
Pekerja OH 0.150 Rp 25,000 Rp 3,750
Tukang batu OH 0.075 Rp 35,000 Rp 2,625
Kepala tukang OH 0.008 Rp 40,000 Rp 320
Tenaga kerja Mandor OH 0.008 Rp 45,000 Rp 360

5.20 Memasang 1 m’ Plesteran Skoning 1 PC : 2 PP, lebar 10 mm Rp 2,125 Rp 17,780


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 0.500 Rp 1,000 Rp 500
Bahan Pasir Pasang m3 0.013 Rp 125,000 Rp 1,625
Pekerja OH 0.080 Rp 25,000 Rp 2,000
Tukang batu OH 0.400 Rp 35,000 Rp 14,000

Tenaga kerja
Spesialis Infrastruktur NMC PNPM-MPd Page 160 of 289
Menghitung Harga Satuan Pekerjaan

Kepala tukang OH 0.040 Rp 40,000 Rp 1,600


Tenaga kerja Mandor OH 0.004 Rp 45,000 Rp 180

5.21 Memasang 1 m2 Plesteran Granit , 1 PC : 2 Granit, tebal 10 mm Rp 10,000 Rp 21,080


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Bahan Batu granit kg 15.000 Rp - Rp -
Pekerja OH 0.450 Rp 25,000 Rp 11,250
Tukang batu OH 0.225 Rp 35,000 Rp 7,875
Kepala tukang OH 0.023 Rp 40,000 Rp 920
Tenaga kerja Mandor OH 0.023 Rp 45,000 Rp 1,035

5.22 Memasang 1 m2 Plesteran Teraso , 1 PC : 2 Batu Teraso, tebal 10 mm Rp 10,000 Rp 21,080


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Bahan Batu teraso kg 15.000 Rp - Rp -
Pekerja OH 0.450 Rp 25,000 Rp 11,250
Tukang batu OH 0.225 Rp 35,000 Rp 7,875
Kepala tukang OH 0.023 Rp 40,000 Rp 920
Tenaga kerja Mandor OH 0.023 Rp 45,000 Rp 1,035

5.23 Memasang 1 m2 Plesteran Ciprat 1 PC : 2 PP Rp 5,070 Rp 12,075


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 4.320 Rp 1,000 Rp 4,320
Bahan Pasir Pasang m3 0.006 Rp 125,000 Rp 750
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.100 Rp 35,000 Rp 3,500
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675

5.24 Memasang 1 m2 finishing siar pasangan dinding bata merah (=20 m’) Rp 3,108 Rp 7,055
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Portland Cement kg 3.108 Rp 1,000 Rp 3,108
Pekerja OH 0.150 Rp 25,000 Rp 3,750
Tukang batu OH 0.075 Rp 35,000 Rp 2,625
Kepala tukang OH 0.008 Rp 40,000 Rp 320
Tenaga kerja Mandor OH 0.008 Rp 45,000 Rp 360

5.25 Memasang 1 m2 finishing siar pasangan dinding conblock ekspose (=8 m’) Rp 1,600 Rp 3,315
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Portland Cement kg 1.600 Rp 1,000 Rp 1,600
Pekerja OH 0.070 Rp 25,000 Rp 1,750
Tukang batu OH 0.035 Rp 35,000 Rp 1,225
Kepala tukang OH 0.004 Rp 40,000 Rp 160
Tenaga kerja Mandor OH 0.004 Rp 45,000 Rp 180

5.26 Memasang 1 m2 finishing siar pasangan batu kali adukan 1 PC : 2 PP Rp 7,840 Rp 14,025

Spesialis Infrastruktur NMC PNPM-MPd Page 161 of 289


Menghitung Harga Satuan Pekerjaan

Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 6.340 Rp 1,000 Rp 6,340
Bahan Pasir Pasang m3 0.012 Rp 125,000 Rp 1,500
Pekerja OH 0.300 Rp 25,000 Rp 7,500
Tukang batu OH 0.150 Rp 35,000 Rp 5,250
Kepala tukang OH 0.015 Rp 40,000 Rp 600
Tenaga kerja Mandor OH 0.015 Rp 45,000 Rp 675

5.27 Memasang 1 m2 acian Rp 3,250 Rp 9,350


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Portland Cement kg 3.250 Rp 1,000 Rp 3,250
Pekerja OH 0.200 Rp 25,000 Rp 5,000
Tukang batu OH 0.100 Rp 35,000 Rp 3,500
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.010 Rp 45,000 Rp 450

VI. PEKERJAAN KAYU


SNI 3434 - 2008

6.1 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas I Rp - Rp 274,750
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu m3 1.100 Rp - Rp -
Paku 10 cm kg 1.250 Rp - Rp -
Bahan Lem kayu kg 1.000 Rp - Rp -
Pekerja OH 7.000 Rp 25,000 Rp 175,000
Tukang kayu OH 21.000 Rp - Rp -
Kepala tukang OH 2.100 Rp 40,000 Rp 84,000
Tenaga kerja Mandor OH 0.350 Rp 45,000 Rp 15,750

6.2 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III Rp - Rp 235,500
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu m3 1.200 Rp - Rp -
Paku 10 cm kg 1.250 Rp - Rp -
Bahan Lem kayu kg 1.000 Rp - Rp -
Pekerja OH 6.000 Rp 25,000 Rp 150,000
Tukang kayu OH 18.000 Rp - Rp -
Kepala tukang OH 1.800 Rp 40,000 Rp 72,000
Tenaga kerja Mandor OH 0.300 Rp 45,000 Rp 13,500

6.3 Membuat dan memasang 1 m2 pintu klamp standar, kayu kelas II Rp - Rp 13,760
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.040 Rp - Rp -
Bahan Paku 5 cm - 7 cm kg 0.050 Rp - Rp -
Pekerja OH 0.350 Rp 25,000 Rp 8,750
Tukang kayu OH 1.050 Rp - Rp -
Kepala tukang OH 0.105 Rp 40,000 Rp 4,200
Tenaga kerja

Spesialis Infrastruktur NMC PNPM-MPd Page 162 of 289


Menghitung Harga Satuan Pekerjaan

Tenaga kerja Mandor OH 0.018 Rp 45,000 Rp 810

6.4 Membuat dan memasang 1 m2 pintu klamp sederhana, kayu kelas III Rp - Rp 13,760
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.040 Rp - Rp -
Bahan Paku 5 cm - 7 cm kg 0.050 Rp - Rp -
Pekerja OH 0.350 Rp 25,000 Rp 8,750
Tukang kayu OH 1.050 Rp - Rp -
Kepala tukang OH 0.105 Rp 40,000 Rp 4,200
Tenaga kerj a Mandor OH 0.018 Rp 45,000 Rp 810

6.5 Membuat dan memasang 1 m2 daun pintu panel, kayu kelas I atau II Rp - Rp 39,250
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.040 Rp - Rp -
Bahan Lem kayu kg 0.500 Rp - Rp -
Pekerja OH 1.000 Rp 25,000 Rp 25,000
Tukang kayu OH 3.000 Rp - Rp -
Kepala tukang OH 0.300 Rp 40,000 Rp 12,000
Tenaga kerja Mandor OH 0.050 Rp 45,000 Rp 2,250

6.6 Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas I atau II Rp - Rp 31,400
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.024 Rp - Rp -
Bahan Lem kayu kg 0.300 Rp - Rp -
Pekerja OH 0.800 Rp 25,000 Rp 20,000
Tukang kayu OH 2.400 Rp - Rp -
Kepala tukang OH 0.240 Rp 40,000 Rp 9,600
Tenaga kerja Mandor OH 0.040 Rp 45,000 Rp 1,800

6.7 Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas I atau II Rp - Rp 39,250
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.064 Rp - Rp -
Bahan Lem kayu kg 0.500 Rp - Rp -
Pekerja OH 1.000 Rp 25,000 Rp 25,000
Tukang kayu OH 3.000 Rp - Rp -
Kepala tukang OH 0.300 Rp 40,000 Rp 12,000
Tenaga kerja Mandor OH 0.050 Rp 45,000 Rp 2,250

6.8 Membuat 1 m2 daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas II (lebar sampai 90 cm) Rp - Rp 27,475
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.025 Rp - Rp -
Paku 1 cm - 2,5 cm kg 0.030 Rp - Rp -
Lem kayu kg 0.500 Rp - Rp -
Plywood tebal 4 mm Ukuran (90 x
Rp -
Bahan 220) cm Lembar 1.000 Rp -
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang kayu OH 2.100 Rp - Rp -

Tenaga kerja
Spesialis Infrastruktur NMC PNPM-MPd Page 163 of 289
Menghitung Harga Satuan Pekerjaan

Kepala tukang OH 0.210 Rp 40,000 Rp 8,400


Tenaga kerja Mandor OH 0.035 Rp 45,000 Rp 1,575

6.9 Membuat 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II Rp - Rp 31,400
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.026 Rp - Rp -
Paku 1 cm - 2,5 cm kg 0.030 Rp - Rp -
Lem kayu kg 0.500 Rp - Rp -
Plywood tebal 4 mm Ukuran (90 x
Rp -
Bahan 220) cm Lembar 1.000 Rp -
Pekerja OH 0.800 Rp 25,000 Rp 20,000
Tukang kayu OH 2.400 Rp - Rp -
Kepala tukang OH 0.240 Rp 40,000 Rp 9,600
Tenaga kerja Mandor OH 0.040 Rp 45,000 Rp 1,800

6.10 Memasang 1 m2 jalusi kusen, kayu kelas I atau II Rp - Rp 39,825


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.060 Rp - Rp -
Bahan Paku 1 cm - 2,5 cm kg 0.150 Rp - Rp -
Pekerja OH 0.670 Rp 25,000 Rp 16,750
Tukang kayu OH 2.000 Rp - Rp -
Kepala tukang OH 0.200 Rp 40,000 Rp 8,000
Tenaga kerja Mandor OH 0.335 Rp 45,000 Rp 15,075

6.11 Memasang 1 m2 teakwood rangkap, rangka expose kayu kelas I Rp - Rp 31,400


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.025 Rp - Rp -
Paku 1 cm - 2,5 cm kg 0.030 Rp - Rp -
Lem kayu kg 0.300 Rp - Rp -
Teakwood tebal 4 mm ukuran (90 x Rp -
Bahan 220) cm Lembar 1.000 Rp -
Pekerja OH 0.800 Rp 25,000 Rp 20,000
Tukang kayu OH 2.400 Rp - Rp -
Kepala tukang OH 0.240 Rp 40,000 Rp 9,600
Tenaga kerja Mandor OH 0.040 Rp 45,000 Rp 1,800

6.12 Memasang 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II Rp - Rp 33,385
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.025 Rp - Rp -
Paku 1 cm - 2,5 cm kg 0.030 Rp - Rp -
Lem kayu kg 0.800 Rp - Rp -
Teakwood tebal 4 mm ukuran (90 x Rp -
220) cm Lembar 1.000 Rp -
Bahan Formika Lembar 0.500 Rp - Rp -
Pekerja OH 0.850 Rp 25,000 Rp 21,250
Tukang kayu OH 2.550 Rp - Rp -
Kepala tukang OH 0.255 Rp 40,000 Rp 10,200
Tenaga kerja

Spesialis Infrastruktur NMC PNPM-MPd Page 164 of 289


Menghitung Harga Satuan Pekerjaan

Tenaga kerja Mandor OH 0.043 Rp 45,000 Rp 1,935

6.13 Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter Rp - Rp 157,000
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu m3 1.100 Rp - Rp -
Besi strip tebal 5 mm kg 15.000 Rp - Rp -
Bahan Paku 12 cm kg 5.600 Rp - Rp -
Pekerja OH 4.000 Rp 25,000 Rp 100,000
Tukang kayu OH 12.000 Rp - Rp -
Kepala tukang OH 1.200 Rp 40,000 Rp 48,000
Tenaga kerja Mandor OH 0.200 Rp 45,000 Rp 9,000

6.14 Memasang 1 m3 konstruksi kuda-kuda expose, kayu kelas I Rp - Rp 262,975


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu m3 1.200 Rp - Rp -
Besi strip tebal 5 mm kg 15.000 Rp - Rp -
Bahan Paku 12 cm kg 5.600 Rp - Rp -
Pekerja OH 6.700 Rp 25,000 Rp 167,500
Tukang kayu OH 20.100 Rp - Rp -
Kepala tukang OH 2.010 Rp 40,000 Rp 80,400
Tenaga kerja Mandor OH 0.335 Rp 45,000 Rp 15,075

6.15 Memasang 1 m3 konstruksi gordeng, kayu kelas II Rp - Rp 94,200


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu m3 1.100 Rp - Rp -
Besi strip tebal 5 mm kg 15.000 Rp - Rp -
Bahan Paku 12 cm kg 3.000 Rp - Rp -
Pekerja OH 2.400 Rp 25,000 Rp 60,000
Tukang kayu OH 7.200 Rp - Rp -
Kepala tukang OH 0.720 Rp 40,000 Rp 28,800
Tenaga kerja Mandor OH 0.120 Rp 45,000 Rp 5,400

6.16 Memasang 1 m2 rangka atap genteng keramik, kayu kelas II Rp - Rp 3,125


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kaso-kaso (5 x 7) cm m3 0.014 Rp - Rp -
Reng (2 x 3) cm m3 0.036 Rp - Rp -
Bahan Paku 5 cm dan 10 cm kg 0.250 Rp - Rp -
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.100 Rp - Rp -
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

6.17 Memasang 1 m2 rangka atap genteng beton, kayu kelas II Rp - Rp 3,125


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kaso-kaso (5 x 7) cm m3 0.014 Rp - Rp -
Reng (3 x 4) cm m3 0.057 Rp - Rp -
Bahan

Spesialis Infrastruktur NMC PNPM-MPd Page 165 of 289


Menghitung Harga Satuan Pekerjaan

Bahan Paku 5 cm dan 10 cm kg 0.250 Rp - Rp -


Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.100 Rp - Rp -
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

6.18 Memasang 1 m2 rangka atap sirap, kayu kelas II Rp - Rp 3,750


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu kelas II m3 0.165 Rp - Rp -
Bahan Paku 5 cm dan 10 cm kg 0.200 Rp - Rp -
Pekerja OH 0.120 Rp 25,000 Rp 3,000
Tukang kayu OH 0.120 Rp - Rp -
Kepala tukang OH 0.012 Rp 40,000 Rp 480
Tenaga kerja Mandor OH 0.006 Rp 45,000 Rp 270

6.19 Memasang 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III Rp - Rp 8,325
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kaso-kaso (5 x 7) cm m3 0.015 Rp - 0
Bahan Paku 7 cm – 10 cm kg 0.200 Rp - Rp -
Pekerja OH 0.150 Rp 25,000 Rp 3,750
Tukang kayu OH 0.300 Rp - Rp -
Kepala tukang OH 0.030 Rp 40,000 Rp 1,200
Tenaga kerja Mandor OH 0.075 Rp 45,000 Rp 3,375

6.20 Memasang 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III Rp - Rp 6,650
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kaso-kaso (5 x 7) cm m3 0.016 Rp - Rp -
Bahan Paku 7 cm – 10 cm kg 0.250 Rp - Rp -
Pekerja OH 0.200 Rp 25,000 Rp 5,000
Tukang kayu OH 0.300 Rp - Rp -
Kepala tukang OH 0.030 Rp 40,000 Rp 1,200
Tenaga kerja Mandor OH 0.010 Rp 45,000 Rp 450

6.21 Memasang 1 m1 lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II Rp - Rp 3,525
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.011 Rp - Rp -
Bahan Paku 5 cm dan 7 cm kg 0.100 Rp - Rp -
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.200 Rp - Rp -
Kepala tukang OH 0.020 Rp 40,000 Rp 800
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

6.22 Memasang 1 m1 lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II Rp - Rp 3,525
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.011 Rp - Rp -
Bahan Paku 5 cm dan 7 cm kg 0.050 Rp - Rp -
Pekerja OH 0.100 Rp 25,000 Rp 2,500

Spesialis Infrastruktur NMC PNPM-MPd Page 166 of 289


Tenaga kerja
Menghitung Harga Satuan Pekerjaan

Tukang kayu OH 0.200 Rp - Rp -


Kepala tukang OH 0.020 Rp 40,000 Rp 800
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

6.23 Memasang 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III Rp - Rp 5,910
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu m3 0.028 Rp - Rp -
Bahan Paku 5 cm dan 7 cm kg 0.150 Rp - Rp -
Pekerja OH 0.150 Rp 25,000 Rp 3,750
Tukang kayu OH 0.450 Rp - Rp -
Kepala tukang OH 0.045 Rp 40,000 Rp 1,800
Tenaga kerja Mandor OH 0.008 Rp 45,000 Rp 360

6.24 Memasang 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II Rp - Rp 5,910
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu, ukuran (6 x 12) cm m3 0.028 Rp - Rp -
Paku 5 cm dan 10 cm kg 0.150 Rp - Rp -
Teakwood tebal 4 mm, Ukuran 120
Rp -
cm x 240 cm Lembar 0.860 Rp -
Bahan Lem kayu kg 0.560 Rp - Rp -
Pekerja OH 0.150 Rp 25,000 Rp 3,750
Tukang kayu OH 0.450 Rp - Rp -
Kepala tukang OH 0.045 Rp 40,000 Rp 1,800
Tenaga kerja Mandor OH 0.008 Rp 45,000 Rp 360

6.25 Memasang 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II Rp - Rp 7,850
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu, ukuran (6 x 12) cm m3 0.028 Rp - Rp -
Paku 5 cm dan 10 cm kg 0.150 Rp - Rp -
Plywood tebal 4 mm, ukuran 120 Rp -
cm x 240 cm Lembar 0.860 Rp -
Bahan Lem kayu kg 0.560 Rp - Rp -
Pekerja OH 0.200 Rp 25,000 Rp 5,000
Tukang kayu OH 0.600 Rp - Rp -
Kepala tukang OH 0.060 Rp 40,000 Rp 2,400
Tenaga kerja Mandor OH 0.010 Rp 45,000 Rp 450

6.26 Memasang 1 m2 dinding lambriziring dari papan kayu kelas I Rp - Rp 23,550


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu m3 0.007 Rp - Rp -
Paku 5 cm dan 10 cm kg 0.100 Rp - Rp -
Bahan Paku skrup 10 cm kg 0.150 Rp - Rp -
Pekerja OH 0.600 Rp 25,000 Rp 15,000
Tukang kayu OH 1.800 Rp - Rp -
Kepala tukang OH 0.180 Rp 40,000 Rp 7,200
Tenaga kerja Mandor OH 0.030 Rp 45,000 Rp 1,350

Spesialis Infrastruktur NMC PNPM-MPd Page 167 of 289


Menghitung Harga Satuan Pekerjaan

6.27 Memasang 1 m2 dinding lambriziring dari plywood ukuran (120 x 240) cm Rp - Rp 990
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plywood tebal 4 mm Lembar 0.400 Rp - Rp -
Bahan Paku 1 cm dan 2,5 cm kg 0.050 Rp - Rp -
Pekerja OH 0.025 Rp 25,000 Rp 625
Tukang kayu OH 0.075 Rp - Rp -
Kepala tukang OH 0.008 Rp 40,000 Rp 320
Tenaga kerja Mandor OH 0.001 Rp 45,000 Rp 45

6.28 Memasang 1 m2 dinding bilik, rangka kayu kelas III atau IV Rp - Rp 2,925
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bilik bambu m2 1.500 Rp - Rp -
Kaso-kaso (5 x 7) cm m3 0.014 Rp - Rp -
Paku kg 0.012 Rp - Rp -
Bahan List kayu 2/4 m3 0.003 Rp - Rp -
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.050 Rp - Rp -
Kepala tukang OH 0.005 Rp 40,000 Rp 200
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

VII. PEKERJAAN PENUTUP LANTAI DAN DINDING


SNI 7395 - 2008

7.1 Memasang 1 m2 lantai ubin PC abu-abu ukuran (40 x 40) cm Rp 15,425 Rp 11,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin abu-abu Buah 6.630 Rp - Rp -
Portland Cement kg 9.800 Rp 1,000 Rp 9,800
Bahan Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Pekerja OH 0.250 Rp 25,000 Rp 6,250
Tukang batu OH 0.125 Rp 35,000 Rp 4,375
Kepala tukang OH 0.013 Rp 40,000 Rp 520
Tenaga kerja Mandor OH 0.013 Rp 45,000 Rp 585

7.2 Memasang 1 m2 lantai ubin PC abu-abu ukuran (30 x 30) cm Rp 15,625 Rp 12,155
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin abu-abu Buah 11.870 Rp - Rp -
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Bahan Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Pekerja OH 0.260 Rp 25,000 Rp 6,500
Tukang batu OH 0.130 Rp 35,000 Rp 4,550
Kepala tukang OH 0.013 Rp 40,000 Rp 520
Tenaga kerja Mandor OH 0.013 Rp 45,000 Rp 585

7.3 Memasang 1 m2 lantai ubin PC abu-abu ukuran (20 x 20) cm Rp 16,025 Rp 12,665
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin abu-abu Buah 26.500 Rp - Rp -

Bahan
Spesialis Infrastruktur NMC PNPM-MPd Page 168 of 289
Menghitung Harga Satuan Pekerjaan

Portland Cement kg 10.400 Rp 1,000 Rp 10,400


Bahan Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Pekerja OH 0.270 Rp 25,000 Rp 6,750
Tukang batu OH 0.135 Rp 35,000 Rp 4,725
Kepala tukang OH 0.014 Rp 40,000 Rp 560
Tenaga kerja Mandor OH 0.014 Rp 45,000 Rp 630

7.4 Memasang 1 m2 lantai ubin warna ukuran (40 x 40) cm Rp 15,425 Rp 11,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin warna Buah 6.630 Rp - Rp -
Portland Cement kg 9.800 Rp 1,000 Rp 9,800
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 1.300 Rp - Rp -
Pekerja OH 0.250 Rp 25,000 Rp 6,250
Tukang batu OH 0.125 Rp 35,000 Rp 4,375
Kepala tukang OH 0.013 Rp 40,000 Rp 520
Tenaga kerja Mandor OH 0.013 Rp 45,000 Rp 585

7.5 Memasang 1 m2 lantai ubin warna ukuran (30 x 30) cm Rp 15,625 Rp 12,155
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin warna Buah 11.870 Rp - Rp -
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 1.500 Rp - Rp -
Pekerja OH 0.260 Rp 25,000 Rp 6,500
Tukang batu OH 0.130 Rp 35,000 Rp 4,550
Kepala tukang OH 0.013 Rp 40,000 Rp 520
Tenaga kerja Mandor OH 0.013 Rp 45,000 Rp 585

7.6 Memasang 1 m2 lantai ubin warna ukuran (20 x 20) cm Rp 16,025 Rp 12,665
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin warna Buah 26.500 Rp - Rp -
Portland Cement kg 10.400 Rp 1,000 Rp 10,400
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 1.620 Rp - Rp -
Pekerja OH 0.270 Rp 25,000 Rp 6,750
Tukang batu OH 0.135 Rp 35,000 Rp 4,725
Kepala tukang OH 0.014 Rp 40,000 Rp 560
Tenaga kerja Mandor OH 0.014 Rp 45,000 Rp 630

7.7 Memasang 1 m2 lantai ubin teraso ukuran (40 x 40) cm Rp 15,425 Rp 11,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teraso Buah 6.630 Rp - Rp -
Portland Cement kg 9.800 Rp 1,000 Rp 9,800
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 1.300 Rp - Rp -
Pekerja OH 0.250 Rp 25,000 Rp 6,250

Spesialis Infrastruktur NMC PNPM-MPd Page 169 of 289


Tenaga kerja
Menghitung Harga Satuan Pekerjaan

Tukang batu OH 0.125 Rp 35,000 Rp 4,375


Kepala tukang OH 0.013 Rp 40,000 Rp 520
Tenaga kerja Mandor OH 0.013 Rp 45,000 Rp 585

7.8 Memasang 1 m2 lantai ubin teraso ukuran (30 x 30) cm Rp 15,625 Rp 12,155
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teraso Buah 11.870 Rp - Rp -
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 1.500 Rp - Rp -
Pekerja OH 0.260 Rp 25,000 Rp 6,500
Tukang batu OH 0.130 Rp 35,000 Rp 4,550
Kepala tukang OH 0.013 Rp 40,000 Rp 520
Tenaga kerja Mandor OH 0.013 Rp 45,000 Rp 585

7.9 Memasang 1 m2 lantai ubin granit ukuran (40 x 40) cm Rp 15,425 Rp 11,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin granit Buah 6.630 Rp - Rp -
Portland Cement kg 9.800 Rp 1,000 Rp 9,800
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 1.300 Rp - Rp -
Pekerja OH 0.250 Rp 25,000 Rp 6,250
Tukang batu OH 0.125 Rp 35,000 Rp 4,375
Kepala tukang OH 0.013 Rp 40,000 Rp 520
Tenaga kerja Mandor OH 0.013 Rp 45,000 Rp 585

7.10 Memasang 1 m2 lantai ubin granit ukuran (30 x 30) cm Rp 15,625 Rp 12,155
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin granit Buah 11.870 Rp - Rp -
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 1.500 Rp - Rp -
Pekerja OH 0.260 Rp 25,000 Rp 6,500
Tukang batu OH 0.130 Rp 35,000 Rp 4,550
Kepala tukang OH 0.013 Rp 40,000 Rp 520
Tenaga kerja Mandor OH 0.013 Rp 45,000 Rp 585

7.11 Memasang 1 m2 lantai ubin teralux ukuran (40 x 40) cm Rp 15,425 Rp 11,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teralux kerang Buah 6.630 Rp - Rp -
Portland Cement kg 9.800 Rp 1,000 Rp 9,800
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 1.300 Rp - Rp -
Pekerja OH 0.250 Rp 25,000 Rp 6,250
Tukang batu OH 0.125 Rp 35,000 Rp 4,375
Kepala tukang OH 0.013 Rp 40,000 Rp 520
Tenaga kerja Mandor OH 0.013 Rp 45,000 Rp 585

Spesialis Infrastruktur NMC PNPM-MPd Page 170 of 289


Menghitung Harga Satuan Pekerjaan

7.12 Memasang 1 m2 lantai ubin teralux ukuran (30 x 30) cm Rp 15,625 Rp 12,155
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teralux kerang Buah 11.870 Rp - Rp -
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 1.500 Rp - Rp -
Pekerja OH 0.260 Rp 25,000 Rp 6,500
Tukang batu OH 0.130 Rp 35,000 Rp 4,550
Kepala tukang OH 0.013 Rp 40,000 Rp 520
Tenaga kerja Mandor OH 0.013 Rp 45,000 Rp 585

7.13 Memasang 1 m2 lantai ubin teralux marmer ukuran (60 x 60) cm Rp 15,225 Rp 11,220
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teralux marmer Buah 3.100 Rp - Rp -
Portland Cement kg 9.600 Rp 1,000 Rp 9,600
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 1.500 Rp - Rp -
Pekerja OH 0.240 Rp 25,000 Rp 6,000
Tukang batu OH 0.120 Rp 35,000 Rp 4,200
Kepala tukang OH 0.012 Rp 40,000 Rp 480
Tenaga kerja Mandor OH 0.012 Rp 45,000 Rp 540

7.14 Memasang 1 m2 lantai ubin teralux marmer ukuran (40 x 40) cm Rp 15,425 Rp 11,730
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teralux marmer Buah 6.630 Rp - Rp -
Portland Cement kg 9.800 Rp 1,000 Rp 9,800
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 1.300 Rp - Rp -
Pekerja OH 0.250 Rp 25,000 Rp 6,250
Tukang batu OH 0.125 Rp 35,000 Rp 4,375
Kepala tukang OH 0.013 Rp 40,000 Rp 520
Tenaga kerja Mandor OH 0.013 Rp 45,000 Rp 585

7.15 Memasang 1 m2 lantai ubin teralux marmer ukuran (30 x 30) cm Rp 15,625 Rp 12,155
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin teralux marmer Buah 11.870 Rp - Rp -
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 1.500 Rp - Rp -
Pekerja OH 0.260 Rp 25,000 Rp 6,500
Tukang batu OH 0.130 Rp 35,000 Rp 4,550
Kepala tukang OH 0.013 Rp 40,000 Rp 520
Tenaga kerja Mandor OH 0.013 Rp 45,000 Rp 585

7.16 Memasang 1 m plint ubin PC abu-abu ukuran (15 x 20) cm Rp 2,150 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Spesialis Infrastruktur NMC PNPM-MPd Page 171 of 289


Menghitung Harga Satuan Pekerjaan

Plint Ubin Buah 5.300 Rp - Rp -


Portland Cement kg 1.650 Rp 1,000 Rp 1,650
Bahan Pasir Pasang m3 0.004 Rp 125,000 Rp 500
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

7.17 Memasang 1 m plint ubin PC abu-abu ukuran (10 x 30) cm Rp 1,615 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint Ubin Buah 3.530 Rp - Rp -
Portland Cement kg 1.240 Rp 1,000 Rp 1,240
Bahan Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

7.18 Memasang 1 m plint ubin PC abu-abu ukuran (10 x 40) cm Rp 1,615 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint Ubin Buah 2.650 Rp - Rp -
Portland Cement kg 1.240 Rp 1,000 Rp 1,240
Bahan Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

7.19 Memasang 1 m plint ubin PC warna ukuran (10 x 20) cm Rp 1,515 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin PC warna Buah 5.300 Rp - Rp -
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Bahan Semen warna kg 0.100 Rp - Rp -
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

7.20 Memasang 1 m plint ubin PC warna ukuran (10 x 30) cm Rp 1,515 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin PC warna Buah 3.530 Rp - Rp -
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Bahan Semen warna kg 0.100 Rp - Rp -
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150

Tenaga kerja
Spesialis Infrastruktur NMC PNPM-MPd Page 172 of 289
Menghitung Harga Satuan Pekerjaan

Kepala tukang OH 0.009 Rp 40,000 Rp 360


Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

7.21 Memasang 1 m plint ubin PC warna ukuran (10 x 40) cm Rp 1,515 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin PC warna Buah 2.650 Rp - Rp -
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Bahan Semen warna kg 0.100 Rp - Rp -
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

7.22 Memasang 1 m plint ubin teraso ukuran (10 x 30) cm Rp 1,515 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teraso Buah 3.530 Rp - Rp -
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Bahan Semen warna kg 0.100 Rp - Rp -
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

7.23 Memasang 1 m plint ubin teraso ukuran (10 x 40) cm Rp 1,515 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teraso Buah 2.650 Rp - Rp -
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Bahan Semen warna Kg 0.100 Rp - Rp -
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

7.24 Memasang 1 m plint ubin granit ukuran (10 x 40) cm Rp 1,515 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin granit Buah 2.650 Rp - Rp -
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Bahan Semen warna kg 0.100 Rp - Rp -
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

Spesialis Infrastruktur NMC PNPM-MPd Page 173 of 289


Menghitung Harga Satuan Pekerjaan

7.25 Memasang 1 m plint ubin granit ukuran (10 x 30) cm Rp 1,515 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin granit Buah 3.530 Rp - Rp -
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Bahan Semen warna kg 0.100 Rp - Rp -
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

7.26 Memasang 1 m plint ubin teralux kerang ukuran (10 x 40) cm Rp 1,515 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teralux kerang Buah 2.650 Rp - Rp -
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Bahan Semen warna kg 0.100 Rp - Rp -
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

7.27 Memasang 1 m plint ubin teralux kerang ukuran (10 x 30) cm Rp 1,515 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teralux kerang Buah 3.530 Rp - Rp -
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Bahan Semen warna Kg 0.100 Rp - Rp -
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

7.28 Memasang 1 m plint ubin teralux marmer ukuran (10 x 60) cm Rp 1,515 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teralux marmer Buah 1.700 Rp - Rp -
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Bahan Semen warna kg 0.100 Rp - Rp -
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

7.29 Memasang 1 m plint ubin teralux marmer ukuran (10 x 40) cm Rp 1,515 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teralux marmer Buah 2.650 Rp - Rp -

Bahan Infrastruktur NMC PNPM-MPd


Spesialis Page 174 of 289
Menghitung Harga Satuan Pekerjaan

Portland Cement kg 1.140 Rp 1,000 Rp 1,140


Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Bahan Semen warna kg 0.100 Rp - Rp -
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

7.30 Memasang 1 m plint ubin teralux marmer ukuran (10 x 30) cm Rp 1,515 Rp 5,985
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint ubin teralux marmer Buah 3.530 Rp - Rp -
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Bahan Semen warna kg 0.100 Rp - Rp -
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

7.31 Memasang 1 m2 lantai teraso cor ditempat, tebal 3 cm Rp - Rp 16,830


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Bahan teraso cor m3 0.036 Rp - Rp -
Pekerja OH 0.360 Rp 25,000 Rp 9,000
Tukang batu OH 0.180 Rp 35,000 Rp 6,300
Kepala tukang OH 0.018 Rp 40,000 Rp 720
Tenaga kerja Mandor OH 0.018 Rp 45,000 Rp 810

7.32 Memasang 1 m2 lantai keramik artistik ukuran (10 x 20) cm Rp 13,815 Rp 32,725
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin keramik artistik Buah 53.000 Rp - Rp -
Portland Cement kg 8.190 Rp 1,000 Rp 8,190
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 2.750 Rp - Rp -
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang batu OH 0.350 Rp 35,000 Rp 12,250
Kepala tukang OH 0.035 Rp 40,000 Rp 1,400
Tenaga kerja Mandor OH 0.035 Rp 45,000 Rp 1,575

7.33 Memasang 1 m2 lantai keramik artistik ukuran (10 x 10) cm atau (5 x 20) cm Rp 13,815 Rp 32,725
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin keramik artistik Buah 106.000 Rp - Rp -
Portland Cement kg 8.190 Rp 1,000 Rp 8,190
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 3.200 Rp - Rp -
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang batu OH 0.350 Rp 35,000 Rp 12,250
Kepala tukang OH 0.035 Rp 40,000 Rp 1,400
Tenaga kerja

Spesialis Infrastruktur NMC PNPM-MPd Page 175 of 289


Menghitung Harga Satuan Pekerjaan

Tenaga kerja Mandor OH 0.035 Rp 45,000 Rp 1,575

7.34 Memasang 1 m2 lantai keramik ukuran (33 x 33) cm Rp 13,815 Rp 32,725


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin keramik Buah 10.000 Rp - Rp -
Portland Cement kg 8.190 Rp 1,000 Rp 8,190
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 1.620 Rp - Rp -
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang batu OH 0.350 Rp 35,000 Rp 12,250
Kepala tukang OH 0.035 Rp 40,000 Rp 1,400
Tenaga kerja Mandor OH 0.035 Rp 45,000 Rp 1,575

7.35 Memasang 1 m2 lantai keramik ukuran (30 x 30) cm Rp 15,625 Rp 32,725


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin keramik Buah 11.870 Rp - Rp -
Portland Cement kg 10.000 Rp 1,000 Rp 10,000
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 1.500 Rp - Rp -
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang batu OH 0.350 Rp 35,000 Rp 12,250
Kepala tukang OH 0.035 Rp 40,000 Rp 1,400
Tenaga kerja Mandor OH 0.035 Rp 45,000 Rp 1,575

7.36 Memasang 1 m2 lantai keramik ukuran (20 x 20) cm Rp 16,025 Rp 32,725


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin keramik Buah 26.500 Rp - Rp -
Portland Cement kg 10.400 Rp 1,000 Rp 10,400
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 1.620 Rp - Rp -
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang batu OH 0.350 Rp 35,000 Rp 12,250
Kepala tukang OH 0.035 Rp 40,000 Rp 1,400
Tenaga kerja Mandor OH 0.035 Rp 45,000 Rp 1,575

7.37 Memasang 1 m2 lantai keramik ukuran (10 x 33) cm, variasi/border Rp 15,425 Rp 49,130
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ubin keramik Buah 33.000 Rp - Rp -
Portland Cement kg 9.800 Rp 1,000 Rp 9,800
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 4.370 Rp - Rp -
Pekerja OH 1.050 Rp 25,000 Rp 26,250
Tukang batu OH 0.525 Rp 35,000 Rp 18,375
Kepala tukang OH 0.053 Rp 40,000 Rp 2,120
Tenaga kerja Mandor OH 0.053 Rp 45,000 Rp 2,385

7.38 Memasang 1 m2 lantai mosaik ukuran (30 x 30) cm, campuran spesi 1 PC : 3 PP Rp 19,025 Rp 32,725

Spesialis Infrastruktur NMC PNPM-MPd Page 176 of 289


Menghitung Harga Satuan Pekerjaan

Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Mosaik Buah 11.870 Rp - Rp -
Portland Cement kg 14.150 Rp 1,000 Rp 14,150
Pasir Pasang m3 0.039 Rp 125,000 Rp 4,875
Bahan Semen warna kg 2.000 Rp - Rp -
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang batu OH 0.350 Rp 35,000 Rp 12,250
Kepala tukang OH 0.035 Rp 40,000 Rp 1,400
Tenaga kerja Mandor OH 0.035 Rp 45,000 Rp 1,575

7.39 Memasang 1 m’ plint keramik ukuran (10 x 20) cm Rp 1,515 Rp 5,985


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint keramik artistik Buah 5.300 Rp - Rp -
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Bahan Semen warna kg 0.025 Rp - Rp -
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

7.40 Memasang 1 m’ plint keramik ukuran (10 x 10) cm Rp 1,515 Rp 5,985


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint keramik artistik Buah 10.600 Rp - Rp -
Portland Cement kg 1.140 Rp 1,000 Rp 1,140
Pasir Pasang m3 0.003 Rp 125,000 Rp 375
Bahan Semen warna kg 0.050 Rp - Rp -
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

7.41 Memasang 1 m’ plint keramik ukuran (5 x 20) cm Rp 758 Rp 5,985


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plint keramik artistik Buah 5.300 Rp - Rp -
Portland Cement kg 0.570 Rp 1,000 Rp 570
Pasir Pasang m3 0.002 Rp 125,000 Rp 188
Bahan Semen warna kg 0.013 Rp - Rp -
Pekerja OH 0.090 Rp 25,000 Rp 2,250
Tukang batu OH 0.090 Rp 35,000 Rp 3,150
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

7.42 Memasang 1 m’ plint internal cove artistik ukuran (5 x 5 x 20) cm Rp 1,515 Rp 49,710
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Internal cove Buah 5.300 Rp - Rp -
Portland Cement kg 1.140 Rp 1,000 Rp 1,140

Bahan
Spesialis Infrastruktur NMC PNPM-MPd Page 177 of 289
Menghitung Harga Satuan Pekerjaan

Pasir Pasang m3 0.003 Rp 125,000 Rp 375


Bahan Semen warna kg 0.100 Rp - Rp -
Pekerja OH 0.750 Rp 25,000 Rp 18,750
Tukang batu OH 0.750 Rp 35,000 Rp 26,250
Kepala tukang OH 0.075 Rp 40,000 Rp 3,000
Tenaga kerja Mandor OH 0.038 Rp 45,000 Rp 1,710

7.43 Memasang 1 m2 lantai marmer ukuran (100 x 100) cm Rp 13,815 Rp 32,725


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Marmer Buah 1.060 Rp - Rp -
Portland Cement kg 8.190 Rp 1,000 Rp 8,190
Pasir Pasang m3 0.045 Rp 125,000 Rp 5,625
Bahan Semen warna kg 0.650 Rp - Rp -
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang batu OH 0.350 Rp 35,000 Rp 12,250
Kepala tukang OH 0.035 Rp 40,000 Rp 1,400
Tenaga kerja Mandor OH 0.035 Rp 45,000 Rp 1,575

7.44 Memasang 1 m2 lantai karpet Rp - Rp 5,335


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Karpet m2 1.050 Rp - Rp -
Bahan Lem kg 0.350 Rp - Rp -
Pekerja OH 0.170 Rp 25,000 Rp 4,250
Tukang kayu OH 0.170 Rp - Rp -
Kepala tukang OH 0.017 Rp 40,000 Rp 680
Tenaga kerja Mandor OH 0.009 Rp 45,000 Rp 405

7.45 Memasang 1 m2 underlayer Rp - Rp 3,750


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Underlayer irubber corrugated m2 1.050 Rp - Rp -
Bahan Lem kg 0.350 Rp - Rp -
Pekerja OH 0.120 Rp 25,000 Rp 3,000
Tukang kayu OH 0.120 Rp - Rp -
Kepala tukang OH 0.012 Rp 40,000 Rp 480
Tenaga kerja Mandor OH 0.006 Rp 45,000 Rp 270

7.46 Memasang 1 m2 lantai parquet Rp - Rp 20,475


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Parquet m2 1.050 Rp - Rp -
Bahan Lem kg 0.600 Rp - Rp -
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang kayu OH 0.350 Rp - Rp -
Kepala tukang OH 0.035 Rp 40,000 Rp 1,400
Tenaga kerja Mandor OH 0.035 Rp 45,000 Rp 1,575

7.47 Memasang 1 m2 lantai kayu (gym floor) Rp - Rp 20,475


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Spesialis Infrastruktur NMC PNPM-MPd Page 178 of 289


Menghitung Harga Satuan Pekerjaan

Gymfloor m2 1.050 Rp - Rp -
Bahan Lem kg 0.600 Rp - Rp -
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang kayu OH 0.350 Rp - Rp -
Kepala tukang OH 0.035 Rp 40,000 Rp 1,400
Tenaga kerja Mandor OH 0.035 Rp 45,000 Rp 1,575

7.48 Memasang 1 m2 dinding porselen ukuran (11 x 11) cm Rp 11,550 Rp 46,750


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Porselen Buah 86.000 Rp - Rp -
Portland Cement kg 9.300 Rp 1,000 Rp 9,300
Pasir Pasang m3 0.018 Rp 125,000 Rp 2,250
Bahan Semen warna kg 1.500 Rp - Rp -
Pekerja OH 1.000 Rp 25,000 Rp 25,000
Tukang batu OH 0.500 Rp 35,000 Rp 17,500
Kepala tukang OH 0.050 Rp 40,000 Rp 2,000
Tenaga kerja Mandor OH 0.050 Rp 45,000 Rp 2,250

7.49 Memasang 1 m2 dinding porselin ukuran (10 x 20) cm Rp 11,550 Rp 42,075


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Porselen Buah 53.000 Rp - Rp -
Portland Cement kg 9.300 Rp 1,000 Rp 9,300
Pasir Pasang m3 0.018 Rp 125,000 Rp 2,250
Bahan Semen warna kg 2.750 Rp - Rp -
Pekerja OH 0.900 Rp 25,000 Rp 22,500
Tukang batu OH 0.450 Rp 35,000 Rp 15,750
Kepala tukang OH 0.045 Rp 40,000 Rp 1,800
Tenaga kerja Mandor OH 0.045 Rp 45,000 Rp 2,025

7.50 Memasang 1 m2 dinding porselin ukuran (20 x 20) cm Rp 11,550 Rp 42,075


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Porselen Buah 26.500 Rp - Rp -
Portland Cement kg 9.300 Rp 1,000 Rp 9,300
Pasir Pasang m3 0.018 Rp 125,000 Rp 2,250
Bahan Semen warna kg 1.940 Rp - Rp -
Pekerja OH 0.900 Rp 25,000 Rp 22,500
Tukang batu OH 0.450 Rp 35,000 Rp 15,750
Kepala tukang OH 0.045 Rp 40,000 Rp 1,800
Tenaga kerja Mandor OH 0.045 Rp 45,000 Rp 2,025

7.51 Memasang 1 m2 dinding keramik artistik ukuran (10 x 20) cm Rp 11,550 Rp 42,075
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Keramik artistik Buah 53.000 Rp - Rp -
Portland Cement kg 9.300 Rp 1,000 Rp 9,300
Pasir Pasang m3 0.018 Rp 125,000 Rp 2,250
Bahan Semen warna kg 2.750 Rp - Rp -
Pekerja OH 0.900 Rp 25,000 Rp 22,500

Spesialis Infrastruktur NMC PNPM-MPd Page 179 of 289


Tenaga kerja
Menghitung Harga Satuan Pekerjaan

Tukang batu OH 0.450 Rp 35,000 Rp 15,750


Kepala tukang OH 0.045 Rp 40,000 Rp 1,800
Tenaga kerja Mandor OH 0.045 Rp 45,000 Rp 2,025

7.52 Memasang 1 m2 dinding keramik artistik ukuran (5 x 20) cm Rp 11,550 Rp 42,075


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Keramik artistik Buah 106.000 Rp - Rp -
Portland Cement kg 9.300 Rp 1,000 Rp 9,300
Pasir Pasang m3 0.018 Rp 125,000 Rp 2,250
Bahan Semen warna kg 2.900 Rp - Rp -
Pekerja OH 0.900 Rp 25,000 Rp 22,500
Tukang batu OH 0.450 Rp 35,000 Rp 15,750
Kepala tukang OH 0.045 Rp 40,000 Rp 1,800
Tenaga kerja Mandor OH 0.045 Rp 45,000 Rp 2,025

7.53 Memasang 1 m2 dinding keramik ukuran (10 x 20) cm Rp 11,550 Rp 42,075


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Keramik Buah 53.000 Rp - Rp -
Portland Cement kg 9.300 Rp 1,000 Rp 9,300
Pasir Pasang m3 0.018 Rp 125,000 Rp 2,250
Bahan Semen warna kg 2.750 Rp - Rp -
Pekerja OH 0.900 Rp 25,000 Rp 22,500
Tukang batu OH 0.450 Rp 35,000 Rp 15,750
Kepala tukang OH 0.045 Rp 40,000 Rp 1,800
Tenaga kerja Mandor OH 0.045 Rp 45,000 Rp 2,025

7.54 Memasang 1 m2 dinding keramik ukuran (20 x 20) cm Rp 11,550 Rp 42,075


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Keramik Buah 26.500 Rp - Rp -
Portland Cement kg 9.300 Rp 1,000 Rp 9,300
Pasir Pasang m3 0.018 Rp 125,000 Rp 2,250
Bahan Semen warna kg 1.940 Rp - Rp -
Pekerja OH 0.900 Rp 25,000 Rp 22,500
Tukang batu OH 0.450 Rp 35,000 Rp 15,750
Kepala tukang OH 0.045 Rp 40,000 Rp 1,800
Tenaga kerja Mandor OH 0.045 Rp 45,000 Rp 2,025

7.55 Memasang 1 m2 dinding marmer ukuran (100 x 100) cm Rp 15,565 Rp 60,775


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Marmer m2 1.060 Rp - Rp -
Paku 12 cm Buah 3.003 Rp - Rp -
Portland Cement kg 12.440 Rp 1,000 Rp 12,440
Pasir Pasang m3 0.025 Rp 125,000 Rp 3,125
Bahan Semen warna kg 0.650 Rp - Rp -
Pekerja OH 1.300 Rp 25,000 Rp 32,500
Tukang batu OH 0.650 Rp 35,000 Rp 22,750
Kepala tukang OH 0.065 Rp 40,000 Rp 2,600
Tenaga kerja

Spesialis Infrastruktur NMC PNPM-MPd Page 180 of 289


Menghitung Harga Satuan Pekerjaan

Tenaga kerja Mandor OH 0.065 Rp 45,000 Rp 2,925

7.56 Memasang 1 m2 dinding bata pelapis ukuran (3 x 7 x 24) cm Rp 15,565 Rp 46,750


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata pelapis dinding Buah 63.000 Rp - Rp -
Portland Cement kg 12.440 Rp 1,000 Rp 12,440
Pasir Pasang m3 0.025 Rp 125,000 Rp 3,125
Bahan Semen warna kg 2.750 Rp - Rp -
Pekerja OH 1.000 Rp 25,000 Rp 25,000
Tukang batu OH 0.500 Rp 35,000 Rp 17,500
Kepala tukang OH 0.050 Rp 40,000 Rp 2,000
Tenaga kerja Mandor OH 0.050 Rp 45,000 Rp 2,250

7.57 Memasang 1 m2 dinding batu paras Rp 16,125 Rp 32,725


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu paras m2 1.100 Rp - Rp -
Portland Cement kg 11.750 Rp 1,000 Rp 11,750
Bahan Pasir Pasang m3 0.035 Rp 125,000 Rp 4,375
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang batu OH 0.350 Rp 35,000 Rp 12,250
Kepala tukang OH 0.035 Rp 40,000 Rp 1,400
Tenaga kerja Mandor OH 0.035 Rp 45,000 Rp 1,575

7.58 Memasang 1 m2 dinding batu tempel hitam Rp 16,125 Rp 32,725


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu tempel hitam m2 1.100 Rp - Rp -
Portland Cement kg 11.750 Rp 1,000 Rp 11,750
Bahan Pasir Pasang m3 0.035 Rp 125,000 Rp 4,375
Pekerja OH 0.700 Rp 25,000 Rp 17,500
Tukang batu OH 0.350 Rp 35,000 Rp 12,250
Kepala tukang OH 0.035 Rp 40,000 Rp 1,400
Tenaga kerja Mandor OH 0.035 Rp 45,000 Rp 1,575

7.59 Memasang 1 m2 lantai vinyl ukuran (30 x 30) cm KL I Rp - Rp 4,710


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Vinyl Buah 11.870 Rp - Rp -
Bahan Lem vinyl kg 0.350 Rp - Rp -
Pekerja OH 0.150 Rp 25,000 Rp 3,750
Tukang OH 0.150 Rp - Rp -
Kepala tukang OH 0.015 Rp 40,000 Rp 600
Tenaga kerja Mandor OH 0.008 Rp 45,000 Rp 360

7.60 Memasang 1 m2 wall paper, lebar 50 cm Rp - Rp 9,520


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Wall paper m 2.200 Rp - Rp -
Bahan Lem kg 0.250 Rp - Rp -
Pekerja OH 0.350 Rp 25,000 Rp 8,750

Spesialis Infrastruktur NMC PNPM-MPd Page 181 of 289


Tenaga kerja
Menghitung Harga Satuan Pekerjaan

Tukang OH 0.175 Rp - Rp -
Kepala tukang OH 0.017 Rp 40,000 Rp 680
Tenaga kerja Mandor OH 0.002 Rp 45,000 Rp 90

7.61 Memasang 1 m2 floor hardener Rp - Rp 3,750


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Floor hardener kg 5.000 Rp - Rp -
Pekerja OH 0.120 Rp 25,000 Rp 3,000
Tukang OH 0.120 Rp - Rp -
Kepala tukang OH 0.012 Rp 40,000 Rp 480
Tenaga kerja Mandor OH 0.006 Rp 45,000 Rp 270

7.62 Memasang 1 m plint vinyil karet ukuran (30 x 30) cm dengan perekat Rp - Rp 2,500
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Vinyl karet Buah 1.760 Rp - Rp -
Bahan Lem vinyl kg 0.080 Rp - Rp -
Pekerja OH 0.080 Rp 25,000 Rp 2,000
Tukang OH 0.080 Rp - Rp -
Kepala tukang OH 0.008 Rp 40,000 Rp 320
Tenaga kerja Mandor OH 0.004 Rp 45,000 Rp 180

7.63 Memasang 1 m plint kayu kelas II ukuran (2 x 10) cm Rp - Rp 3,750


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu kelas II m3 0.003 Rp - Rp -
Bahan Paku skrup 5 cm kg 0.050 Rp - Rp -
Pekerja OH 0.120 Rp 25,000 Rp 3,000
Tukang kayu OH 0.120 Rp - Rp -
Kepala tukang OH 0.012 Rp 40,000 Rp 480
Tenaga kerja Mandor OH 0.006 Rp 45,000 Rp 270

VIII. PEKERJAAN LANGIT-LANGIT


SNI 2839 - 2008

8.1 Memasang 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm Rp - Rp 1,210
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes semen m2 1.100 Rp - Rp -
Bahan Paku tripleks kg 0.010 Rp - Rp -
Pekerja OH 0.030 Rp 25,000 Rp 750
Tukang kayu OH 0.070 Rp - Rp -
Kepala tukang OH 0.007 Rp 40,000 Rp 280
Tenaga kerja Mandor OH 0.004 Rp 45,000 Rp 180

8.2 Memasang 1 m2 langit-langit akustik ukuran (30 x 30) cm Rp - Rp 3,750


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
akustik ukuran (30 x 30) cm Lembar 12.000 Rp - Rp -
Bahan Paku tripleks kg 0.050 Rp - Rp -

Spesialis Infrastruktur NMC PNPM-MPd Page 182 of 289


Menghitung Harga Satuan Pekerjaan

Pekerja OH 0.120 Rp 25,000 Rp 3,000


Tukang kayu OH 0.120 Rp - Rp -
Kepala tukang OH 0.012 Rp 40,000 Rp 480
Tenaga kerja Mandor OH 0.006 Rp 45,000 Rp 270

8.3 Memasang 1 m2 langit-langit akustik ukuran (30 x 60) cm Rp - Rp 3,125


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
akustik ukuran (30 x 60) cm Lembar 5.800 Rp - Rp -
Bahan Paku tripleks kg 0.050 Rp - Rp -
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.100 Rp - Rp -
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

8.4 Memasang 1 m2 langit-langit akustik ukuran (60 x 120) cm Rp - Rp 3,125


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Akustik Ukuran 60 cm x 120 cm Lembar 1.500 Rp - Rp -
Bahan Paku tripleks kg 0.050 Rp - Rp -
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.100 Rp - Rp -
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

8.5 Memasang 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm dan 6 mm Rp - Rp 3,125
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Tripleks Lembar 0.375 Rp - Rp -
Bahan Paku tripleks kg 0.030 Rp - Rp -
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.100 Rp - Rp -
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

8.6 Memasang 1 m2 langit-langit lambriziring kayu, tebal 9 mm Rp - Rp 25,000


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu papan m3 0.015 Rp - Rp -
Bahan Paku tripleks kg 0.010 Rp - Rp -
Pekerja OH 0.800 Rp 25,000 Rp 20,000
Tukang kayu OH 0.800 Rp - Rp -
Kepala tukang OH 0.080 Rp 40,000 Rp 3,200
Tenaga kerja Mandor OH 0.040 Rp 45,000 Rp 1,800

8.7 Memasang 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm Rp - Rp 2,925
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Gypsum board Lembar 0.364 Rp - Rp -
Bahan Paku skrup kg 0.110 Rp - Rp -
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang kayu OH 0.050 Rp - Rp -

Tenaga kerja
Spesialis Infrastruktur NMC PNPM-MPd Page 183 of 289
Menghitung Harga Satuan Pekerjaan

Kepala tukang OH 0.005 Rp 40,000 Rp 200


Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

8.8 Memasang 1 m’ list langit-langit gysum profil Rp - Rp 1,875


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
List gypsum m' 1.050 Rp - Rp -
Bahan Tepung gypsum kg 0.150 Rp - Rp -
Pekerja OH 0.060 Rp 25,000 Rp 1,500
Tukang kayu OH 0.060 Rp - Rp -
Kepala tukang OH 0.006 Rp 40,000 Rp 240
Tenaga kerja Mandor OH 0.003 Rp 45,000 Rp 135

8.9 Memasang 1 m2 langit-langit akustik ukuran (60 x 120) cm + rangka alluminium Rp - Rp 15,625
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Profil Alluminium "T" m’ 3.600 Rp - Rp -
Kawat diameter 4 mm kg 0.150 Rp - Rp -
Ramset Buah 1.050 Rp - Rp -
Bahan Akustik Ukuran 60 cm x 120 cm Lembar 1.500 Rp - Rp -
Pekerja OH 0.500 Rp 25,000 Rp 12,500
Tukang besi OH 0.500 Rp - Rp -
Kepala tukang OH 0.050 Rp 40,000 Rp 2,000
Tenaga kerja Mandor OH 0.025 Rp 45,000 Rp 1,125

8.10 Memasang 1 m’ list langit-langit kayu profil Rp - Rp 1,585


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
List kayu profil m’ 1.050 Rp - Rp -
Bahan Paku kg 0.010 Rp - Rp -
Pekerja OH 0.050 Rp 25,000 Rp 1,250
Tukang kayu OH 0.050 Rp - Rp -
Kepala tukang OH 0.005 Rp 40,000 Rp 200
Tenaga kerja Mandor OH 0.003 Rp 45,000 Rp 135

IX. PEKERJAAN BESI DAN ALUMUNIUM


SNI 7393 - 2008
9.1 Memasang 1 kg besi profil Rp - Rp 1,875
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Besi profil kg 1.150 Rp - Rp -
Pekerja OH 0.060 Rp 25,000 Rp 1,500
Tukang las OH 0.060 Rp - Rp -
Kepala tukang OH 0.006 Rp 40,000 Rp 240
Tenaga kerja Mandor OH 0.003 Rp 45,000 Rp 135

9.2 Memasang 1 kg rangka kuda-kuda baja IWF Rp - Rp 1,875


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Besi baja IWF kg 1.150 Rp - Rp -

Spesialis Infrastruktur NMC PNPM-MPd Page 184 of 289


Menghitung Harga Satuan Pekerjaan

Pekerja OH 0.060 Rp 25,000 Rp 1,500


Tukang las OH 0.060 Rp - Rp -
Kepala tukang OH 0.006 Rp 40,000 Rp 240
Tenaga kerja Mandor OH 0.003 Rp 45,000 Rp 135

9.3 Mengerjakan 100 kg pekerjaan perakitan Rp - Rp 2,765


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Solar Liter 1.000 Rp - Rp -
Bahan Minyak pelumas Liter 0.100 Rp - Rp -
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang besi OH 0.100 Rp - Rp -
Kepala tukang OH 0.001 Rp 40,000 Rp 40
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225
Alat Sewa alat perakitan baja Jam 0.800 Rp - Rp -

9.4 Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku Rp - Rp 32,790
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Besi siku L 30.30.3 kg 15.000 Rp - Rp -
Besi plat baja kg 32.800 Rp - Rp -
Bahan kawat las kg 0.050 Rp - Rp -
Pekerja OH 1.050 Rp 25,000 Rp 26,250
Tukang besi OH 1.050 Rp - Rp -
Kepala tukang OH 0.105 Rp 40,000 Rp 4,200
Tenaga kerja Mandor OH 0.052 Rp 45,000 Rp 2,340

9.5 Mengerjakan 10 cm pengelasan dengan las listrik Rp - Rp 1,170


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kawat las listrik kg 0.400 Rp - Rp -
Solar Liter 0.300 Rp - Rp -
Bahan Minyak pelumas Liter 0.040 Rp - Rp -
Pekerja OH 0.040 Rp 25,000 Rp 1,000
Tukang besi OH 0.020 Rp - Rp -
Kepala tukang OH 0.002 Rp 40,000 Rp 80
Tenaga kerja Mandor OH 0.002 Rp 45,000 Rp 90
Alat Sewa alat Jam 0.170

9.6 Membuat 1 m2 rangka jendela besi scuare tube (25 x 5) cm Rp - Rp 20,290


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Besi scuare tube m 4.760 Rp - Rp -
Besi lis kaca (1 x 1) cm m 4.522 Rp - Rp -
Bahan Pengelasan cm 20.000 Rp - Rp -
Pekerja OH 0.650 Rp 25,000 Rp 16,250
Tukang besi OH 0.650 Rp - Rp -
Kepala tukang OH 0.065 Rp 40,000 Rp 2,600
Tenaga kerja Mandor OH 0.032 Rp 45,000 Rp 1,440

9.7 Memasang 1 m2 pintu rolling door besi Rp - Rp 35,070

Spesialis Infrastruktur NMC PNPM-MPd Page 185 of 289


Menghitung Harga Satuan Pekerjaan

Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Pintu gulung besi m2 1.000 Rp - Rp -
Pekerja OH 1.200 Rp 25,000 Rp 30,000
Tukang besi OH 1.200 Rp - Rp -
Kepala tukang OH 0.120 Rp 40,000 Rp 4,800
Tenaga kerja Mandor OH 0.006 Rp 45,000 Rp 270

9.8 Memasang 1 m2 pintu lipat (Folding door) Rp - Rp 13,750


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Pintu lipat m2 1.000 Rp - Rp -
Pekerja OH 0.440 Rp 25,000 Rp 11,000
Tukang besi OH 0.440 Rp - Rp -
Kepala tukang OH 0.044 Rp 40,000 Rp 1,760
Tenaga kerja Mandor OH 0.022 Rp 45,000 Rp 990

9.9 Memasang 1 m2 sunscreen alluminium Rp - Rp 5,380


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Sunscreen alluminium m2 1.000 Rp - Rp -
Pekerja OH 0.080 Rp 25,000 Rp 2,000
Tukang besi OH 0.800 Rp - Rp -
Kepala tukang OH 0.080 Rp 40,000 Rp 3,200
Tenaga kerja Mandor OH 0.004 Rp 45,000 Rp 180

9.10 Memasang 1 m2 rolling door alluminium Rp - Rp 31,250


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Rolling door alluminium m2 1.000 Rp - Rp -
Pekerja OH 1.000 Rp 25,000 Rp 25,000
Tukang besi OH 1.000 Rp - Rp -
Kepala tukang OH 0.100 Rp 40,000 Rp 4,000
Tenaga kerja Mandor OH 0.050 Rp 45,000 Rp 2,250

9.11 Memasang 1 m kusen pintu alluminium Rp - Rp 1,342


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Profil alluminium m 1.100 Rp - Rp -
Skrup fixer Buah 2.000 Rp - Rp -
Bahan Sealant Tube 0.060 Rp - Rp -
Pekerja OH 0.043 Rp 25,000 Rp 1,075
Tukang besi konstruksi OH 0.043 Rp - Rp -
Kepala tukang OH 0.004 Rp 40,000 Rp 172
Tenaga kerja Mandor OH 0.002 Rp 45,000 Rp 95

9.12 Memasang 1 m2 pintu alluminium strip lebar 8 cm Rp - Rp 2,654


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Profil alluminium m’ 4.400 Rp - Rp -
Bahan Alluminium strip m’ 14.600 Rp - Rp -
Pekerja OH 0.085 Rp 25,000 Rp 2,125
Tukang besi OH 0.085 Rp - Rp -

Tenaga kerja
Spesialis Infrastruktur NMC PNPM-MPd Page 186 of 289
Menghitung Harga Satuan Pekerjaan

Kepala tukang OH 0.009 Rp 40,000 Rp 340


Tenaga kerja Mandor OH 0.004 Rp 45,000 Rp 189

9.13 Memasang 1 m2 pintu kaca rangka alluminium Rp - Rp 2,710


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pintu alluminium m 4.400 Rp - Rp -
Profil kaca m 4.500 Rp - Rp -
Bahan Sealant Tube 0.270 Rp - Rp -
Pekerja OH 0.085 Rp 25,000 Rp 2,125
Tukang besi OH 0.085 Rp - Rp -
Kepala tukang OH 0.009 Rp 40,000 Rp 360
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

9.14 Memasang 1 m2 venetions blinds dan Vertical blinds Rp - Rp 10,960


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Venetions blinds dan vertical blinds m2 1.000
Rp -
Bahan (tirai) Rp -
Pekerja OH 0.350 Rp 25,000 Rp 8,750
Tukang besi OH 0.350 Rp - Rp -
Kepala tukang OH 0.035 Rp 40,000 Rp 1,400
Tenaga kerja Mandor OH 0.018 Rp 45,000 Rp 810

9.15 Memasang 1 m2 terali besi strip (2 x 3) mm Rp - Rp 52,165


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Besi strip kg 6.177 Rp - Rp -
Bahan Pengelasan cm 27.080 Rp - Rp -
Pekerja OH 1.670 Rp 25,000 Rp 41,750
Tukang besi OH 1,670.000 Rp - Rp -
Kepala tukang OH 0.167 Rp 40,000 Rp 6,680
Tenaga kerja Mandor OH 0.083 Rp 45,000 Rp 3,735

9.16 Memasang 1 m2 kawat nyamuk Rp - Rp 3,125


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kawat nyamuk m2 1.100 Rp - Rp -
Pengelasan cm 11.110 Rp - Rp -
Bahan Baja strip (0,2 x 2) cm kg 1.716 Rp - Rp -
Pekerja OH 0.100 Rp 25,000 Rp 2,500
Tukang besi OH 0.100 Rp - Rp -
Kepala tukang OH 0.010 Rp 40,000 Rp 400
Tenaga kerja Mandor OH 0.005 Rp 45,000 Rp 225

9.17 Memasang 1 m2 jendela nako & tralis Rp - Rp 5,845


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Jendela nako (rangka + kaca 5
mm) m2 1.100 Rp - Rp -
Paku skrup 1 cm – 2,5 cm Buah 10.000 Rp - Rp -
Bahan Besi strip m’ 7.000 Rp - Rp -
Pekerja OH 0.200 Rp 25,000 Rp 5,000

Spesialis Infrastruktur NMC PNPM-MPd Page 187 of 289


Tenaga kerja
Menghitung Harga Satuan Pekerjaan

Tukang besi OH 0.200 Rp - Rp -


Kepala tukang OH 0.020 Rp 40,000 Rp 800
Tenaga kerja Mandor OH 0.001 Rp 45,000 Rp 45

9.18 Memasang 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm Rp - Rp 6,450


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Seng plat m’ 1.050 Rp - Rp -
Paku 1 cm - 2,5 cm kg 0.015 Rp - Rp -
Bahan Papan kayu kelas II atau III m3 0.019 Rp - Rp -
Pekerja OH 0.200 Rp 25,000 Rp 5,000
Tukang besi OH 0.400 Rp - Rp -
Kepala tukang OH 0.025 Rp 40,000 Rp 1,000
Tenaga kerja Mandor OH 0.010 Rp 45,000 Rp 450

9.19 Memasang 1 m’ talang 1/2 lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm Rp - Rp 5,310
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Seng plat m 1.050 Rp - Rp -
Paku 1 cm - 2,5 cm kg 0.010 Rp - Rp -
Bahan Besi strip kg 0.500 Rp - Rp - Rp -
Pekerja OH 0.150 Rp 25,000 Rp 3,750
Tukang besi OH 0.300 Rp - Rp -
Kepala tukang OH 0.030 Rp 40,000 Rp 1,200
Tenaga kerja Mandor OH 0.008 Rp 45,000 Rp 360

X. PEKERJAAN PENUTUP ATAP


SNI. 03-3436-1994

10.1 1m² Pasang Atap Genteng Palentong Kecil Rp - Rp 4,430


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Genteng Palentong bh 25.000 Rp - Rp -
Pekerja Oh 0.150 Rp 25,000 Rp 3,750
Tukang kayu Oh 0.075 Rp - Rp -
Kepala tukang Oh 0.008 Rp 40,000 Rp 320
Tenaga Mandor Oh 0.008 Rp 45,000 Rp 360

10.2 1m² Pasang Atap Genteng Kodok / Glazzur Rp - Rp 4,430


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Genteng Kodok bh 25.000 Rp - Rp -
Pekerja Oh 0.150 Rp 25,000 Rp 3,750
Tukang kayu Oh 0.075 Rp - Rp -
Kepala tukang Oh 0.008 Rp 40,000 Rp 320
Tenaga Mandor Oh 0.008 Rp 45,000 Rp 360

10.3 1m² Pasang Atap Genteng Palentong Super / Besar Rp - Rp 4,350


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Genteng Palentong Super bh 12.000 Rp - Rp -

Spesialis Infrastruktur NMC PNPM-MPd Page 188 of 289


Menghitung Harga Satuan Pekerjaan

Pekerja Oh 0.150 Rp 25,000 Rp 3,750


Tukang kayu Oh 0.060 Rp - Rp -
Kepala tukang Oh 0.006 Rp 40,000 Rp 240
Tenaga Mandor Oh 0.008 Rp 45,000 Rp 360

10.4 1m' Pasang Genteng Bubung Palentong Rp 4,000 Rp 10,890


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Genteng Bubung Palentong bh 5.000 Rp - Rp -
Semen Portland Kg 8.000 Rp - Rp -
Bahan Pasir Pasang m3 0.032 Rp 125,000 Rp 4,000
Pekerja Oh 0.400 Rp 25,000 Rp 10,000
Tukang kayu Oh 0.200 Rp - Rp -
Kepala tukang Oh 0.020 Rp 40,000 Rp 800
Tenaga Mandor Oh 0.002 Rp 45,000 Rp 90

10.5 1m' Pasang Genteng Bubung Kodok Glazzur Rp 4,000 Rp 10,890


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Genteng Bubung Kodok bh 5.000 Rp - Rp -
Semen Portland Kg 8.000 Rp - Rp -
Bahan Pasir Pasang m3 0.032 Rp 125,000 Rp 4,000
Pekerja Oh 0.400 Rp 25,000 Rp 10,000
Tukang kayu Oh 0.200 Rp - Rp -
Kepala tukang Oh 0.020 Rp 40,000 Rp 800
Tenaga Mandor Oh 0.002 Rp 45,000 Rp 90

10.6 1m' Pasang Genteng Bubung Palentong Besar Rp 4,000 Rp 10,890


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Genteng Bubung Palentong bh 4.000 Rp - Rp -
Semen Portland Kg 8.000 Rp - Rp -
Bahan Pasir Pasang m3 0.032 Rp 125,000 Rp 4,000
Pekerja Oh 0.400 Rp 25,000 Rp 10,000
Tukang kayu Oh 0.200 Rp - Rp -
Tenaga Kepala tukang Oh 0.020 Rp 40,000 Rp 800
Mandor Oh 0.002 Rp 45,000 Rp 90

10.7 1m' Pasang Rooflight Fiberglass ( 180 x 90 ) cm Rp - Rp 4,095


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Roof Light Fiberglass lbr 0.600 Rp - Rp -
Bahan Paku Kg 0.050 Rp - Rp -
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp - Rp -
Kepala tukang Oh 0.007 Rp 40,000 Rp 280
Tenaga Mandor Oh 0.007 Rp 45,000 Rp 315

10.8 1m' Pasang Atap Asbes Gelombang ( 2.50 x 0.92 m ) X 5mm Rp - Rp 4,180
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Spesialis Infrastruktur NMC PNPM-MPd Page 189 of 289


Menghitung Harga Satuan Pekerjaan

Asbes Gelombang lbr 0.500 Rp - Rp -


Bahan Paku Pancing 60 x 230 Kg 0.120 Rp - Rp -
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.075 Rp - Rp -
Kepala tukang Oh 0.008 Rp 40,000 Rp 320
Tenaga Mandor Oh 0.008 Rp 45,000 Rp 360

10.9 1m' Pasang Atap Asbes Gelombang ( 2.25 x 0.92 m ) X 5mm Rp - Rp 4,180
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.600 Rp - Rp -
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp - Rp -
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.075 Rp - Rp -
Kepala tukang Oh 0.008 Rp 40,000 Rp 320
Tenaga Mandor Oh 0.008 Rp 45,000 Rp 360

10.10 1m' Pasang Atap Asbes Gelombang ( 2.00 x 0.92 m ) X 5mm Rp - Rp 4,095
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.600 Rp - Rp -
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp - Rp -
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.070 Rp - Rp -
Kepala tukang Oh 0.007 Rp 40,000 Rp 280
Tenaga Mandor Oh 0.007 Rp 45,000 Rp 315

10.11 1m' Pasang Atap Asbes Gelombang ( 1.80 x 0.92 m ) X 5mm Rp - Rp 4,095
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.750 Rp - Rp -
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp - Rp -
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.070 Rp - Rp -
Kepala tukang Oh 0.007 Rp 40,000 Rp 280
Tenaga Mandor Oh 0.007 Rp 45,000 Rp 315

10.12 1m² Pasang Atap Asbes Gelombang ( 300 x 1.05 m ) X 4mm Rp - Rp 4,095
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.350 Rp - Rp -
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp - Rp -
Tenaga Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.070 Rp - Rp -
Kepala tukang Oh 0.007 Rp 40,000 Rp 280
Mandor Oh 0.007 Rp 45,000 Rp 315

10.13 1m² Pasang Atap Asbes Gelombang ( 270 x 1.05 m ) X 4mm Rp - Rp 4,095
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.420 Rp - Rp -
Bahan

Spesialis Infrastruktur NMC PNPM-MPd Page 190 of 289


Menghitung Harga Satuan Pekerjaan

Bahan Paku Pancing 60 x 230 Kg 0.120 Rp - Rp -


Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.070 Rp - Rp -
Kepala tukang Oh 0.007 Rp 40,000 Rp 280
Tenaga Mandor Oh 0.007 Rp 45,000 Rp 315

10.14 1m² Pasang Atap Asbes Gelombang ( 240 x 1.05 m ) X 4mm Rp - Rp 4,095
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.440 Rp - Rp -
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp - Rp -
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp - Rp -
Kepala tukang Oh 0.007 Rp 40,000 Rp 280
Tenaga Mandor Oh 0.007 Rp 45,000 Rp 315

10.15 1m² Pasang Atap Asbes Gelombang ( 210 x 1.05 m ) X 4mm Rp - Rp 4,095
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.510 Rp - Rp -
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp - Rp -
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp - Rp -
Kepala tukang Oh 0.007 Rp 40,000 Rp 280
Tenaga Mandor Oh 0.007 Rp 45,000 Rp 315

10.16 1m² Pasang Atap Asbes Gelombang ( 1.5 x 1.05 m ) X 4mm Rp - Rp 4,095
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.800 Rp - Rp -
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp - Rp -
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp - Rp -
Kepala tukang Oh 0.007 Rp 40,000 Rp 280
Tenaga Mandor Oh 0.007 Rp 45,000 Rp 315

10.17 1m² Pasang Atap Asbes Gelombang ( 3.00 x 1.08 m ) X 6mm Rp - Rp 4,095
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.370 Rp - Rp -
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp - Rp -
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp - Rp -
Kepala tukang Oh 0.007 Rp 40,000 Rp 280
Tenaga Mandor Oh 0.007 Rp 45,000 Rp 315

10.18 1m² Pasang Atap Asbes Gelombang ( 2.7 x 1.08 m ) X 6mm Rp - Rp 4,095
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.380 Rp - Rp -
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp - Rp -

Spesialis Infrastruktur NMC PNPM-MPd Page 191 of 289


Menghitung Harga Satuan Pekerjaan

Pekerja Oh 0.140 Rp 25,000 Rp 3,500


Tukang kayu Oh 0.067 Rp - Rp -
Kepala tukang Oh 0.007 Rp 40,000 Rp 280
Tenaga Mandor Oh 0.007 Rp 45,000 Rp 315

10.19 1m² Pasang Atap Asbes Gelombang ( 2.4 x 1.08 m ) X 6mm Rp - Rp 4,095
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.460 Rp - Rp -
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp - Rp -
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp - Rp -
Kepala tukang Oh 0.007 Rp 40,000 Rp 280
Tenaga Mandor Oh 0.007 Rp 45,000 Rp 315

10.20 1m² Pasang Atap Asbes Gelombang ( 2.1 x 1.08 m ) X 6mm Rp - Rp 4,095
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.490 Rp - Rp -
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp - Rp -
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp - Rp -
Kepala tukang Oh 0.007 Rp 40,000 Rp 280
Tenaga Mandor Oh 0.007 Rp 45,000 Rp 315

10.21 1m² Pasang Atap Asbes Gelombang ( 1.80 x 1.08 m ) X 6mm Rp - Rp 4,095
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 0.570 Rp - Rp -
Bahan Paku Pancing 60 x 230 Kg 0.120 Rp - Rp -
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang kayu Oh 0.067 Rp - Rp -
Kepala tukang Oh 0.007 Rp 40,000 Rp 280
Tenaga Mandor Oh 0.007 Rp 45,000 Rp 315

10.22 1m' Pasang Bubung Stel Gelombang 0.92m Rp - Rp 2,800


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 2.400 Rp - Rp -
Bahan Paku Pancing 60 x 230 Kg 6.000 Rp - Rp -
Pekerja Oh 0.084 Rp 25,000 Rp 2,100
Tukang kayu Oh 0.125 Rp - Rp -
Kepala tukang Oh 0.013 Rp 40,000 Rp 520
Tenaga Mandor Oh 0.004 Rp 45,000 Rp 180

10.23 1m' Pasang Nok Stel Gelombang 0.92m Rp - Rp 2,800


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 2.400 Rp - Rp -
Bahan Paku Skrup 3.5" bh 6.000 Rp - Rp -
Pekerja Oh 0.084 Rp 25,000 Rp 2,100

Spesialis Infrastruktur NMC PNPM-MPd Page 192 of 289


Tenaga
Menghitung Harga Satuan Pekerjaan

Tukang kayu Oh 0.125 Rp - Rp -


Kepala tukang Oh 0.013 Rp 40,000 Rp 520
Tenaga Mandor Oh 0.004 Rp 45,000 Rp 180

10.24 1m' Pasang Nok Stel Gelombang 1.05m Rp - Rp 2,800


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 2.100 Rp - Rp -
Bahan Paku Skrup 3.5" bh 6.000 Rp - Rp -
Pekerja Oh 0.084 Rp 25,000 Rp 2,100
Tukang kayu Oh 0.125 Rp - Rp -
Kepala tukang Oh 0.013 Rp 40,000 Rp 520
Tenaga Mandor Oh 0.004 Rp 45,000 Rp 180

10.25 1m' Pasang Nok Stel Gelombang 1.08m Rp - Rp 2,800


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Asbes Gelombang lbr 2.050 Rp - Rp -
Bahan Paku Skrup 3.5" bh 6.000 Rp - Rp -
Pekerja Oh 0.084 Rp 25,000 Rp 2,100
Tukang kayu Oh 0.125 Rp - Rp -
Kepala tukang Oh 0.013 Rp 40,000 Rp 520
Tenaga Mandor Oh 0.004 Rp 45,000 Rp 180

10.26 1m' Pasang Nok Paten 0.92m Rp - Rp 2,800


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Nok Paten lbr 1.200 Rp - Rp -
Bahan Paku Skrup 3.5" bh 6.000 Rp - Rp -
Pekerja Oh 0.084 Rp 25,000 Rp 2,100
Tukang kayu Oh 0.125 Rp - Rp -
Kepala tukang Oh 0.013 Rp 40,000 Rp 520
Tenaga Mandor Oh 0.004 Rp 45,000 Rp 180

10.27 1m' Pasang Nok Paten 1.05m Rp - Rp 2,800


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Nok Paten lbr 1.200 Rp - Rp -
Bahan Paku Skrup 3.5" bh 6.000 Rp - Rp -
Pekerja Oh 0.084 Rp 25,000 Rp 2,100
Tukang kayu Oh 0.125 Rp - Rp -
Kepala tukang Oh 0.013 Rp 40,000 Rp 520
Tenaga Mandor Oh 0.004 Rp 45,000 Rp 180

10.28 1m' Pasang Nok Paten 1.08m Rp - Rp 2,800


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Nok Paten lbr 1.200 Rp - Rp -
Bahan Paku Skrup 3.5" bh 6.000 Rp - Rp -
Pekerja Oh 0.084 Rp 25,000 Rp 2,100
Tukang kayu Oh 0.125 Rp - Rp -

TenagaInfrastruktur NMC PNPM-MPd


Spesialis Page 193 of 289
Menghitung Harga Satuan Pekerjaan

Kepala tukang Oh 0.013 Rp 40,000 Rp 520


Tenaga Mandor Oh 0.004 Rp 45,000 Rp 180

10.29 1m' Pasang Nok Stel rata 0.92m Rp - Rp 3,200


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Nok Stel rata lbr 1.100 Rp - Rp -
Bahan Paku Skrup 3.5" bh 6.000 Rp - Rp -
Pekerja Oh 0.100 Rp 25,000 Rp 2,500
Tukang kayu Oh 0.150 Rp - Rp -
Kepala tukang Oh 0.013 Rp 40,000 Rp 520
Tenaga Mandor Oh 0.004 Rp 45,000 Rp 180

10.30 1m' Pasang Nok Stel rata 1.05m Rp - Rp 2,800


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Nok Stel rata lbr 1.100 Rp - Rp -
Bahan Paku Skrup 3.5" bh 6.000 Rp - Rp -
Pekerja Oh 0.084 Rp 25,000 Rp 2,100
Tukang kayu Oh 0.125 Rp - Rp -
Kepala tukang Oh 0.013 Rp 40,000 Rp 520
Tenaga Mandor Oh 0.004 Rp 45,000 Rp 180

10.31 1m² Pasang Atap Genteng Beton Rp - Rp 5,850


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Genteng Beton lbr 11.000 Rp - Rp -
Bahan Paku Biasa 2" - 5" bh 0.030 Rp - Rp -
Pekerja Oh 0.200 Rp 25,000 Rp 5,000
Tukang kayu Oh 0.100 Rp - Rp -
Kepala tukang Oh 0.010 Rp 40,000 Rp 400
Tenaga Mandor Oh 0.010 Rp 45,000 Rp 450

10.32 1m² Pasang Atap Genteng Aspal Rp - Rp 5,570


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Genteng Aspal lbr 6.900 Rp - Rp -
Plywood 4 mm lbr 0.350 Rp - Rp -
Paku Biasa 1/2" - 1" Kg 0.030 Rp - Rp -
Bahan Plastic Aerator Bh 0.500 Rp - Rp -
Pekerja Oh 0.200 Rp 25,000 Rp 5,000
Tukang kayu Oh 0.300 Rp - Rp -
Kepala tukang Oh 0.003 Rp 40,000 Rp 120
Tenaga Mandor Oh 0.010 Rp 45,000 Rp 450

10.33 1m² Pasang Atap Genteng Metal Rp - Rp 5,445


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Genteng Metal lbr 1.020 Rp - Rp -
Bahan Paku Biasa 2" - 5" Kg 0.200 Rp - Rp -
Pekerja Oh 0.200 Rp 25,000 Rp 5,000

Spesialis Infrastruktur NMC PNPM-MPd Page 194 of 289


Tenaga
Menghitung Harga Satuan Pekerjaan

Tukang kayu Oh 0.100 Rp - Rp -


Kepala tukang Oh 0.010 Rp 40,000 Rp 400
Tenaga Mandor Oh 0.001 Rp 45,000 Rp 45

10.34 1m² Pasang Atap Sirap Rp - Rp 5,510


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Genteng Sirap lbr 60.000 Rp - Rp -
Bahan Paku Biasa ½" - 1" Kg 0.200 Rp - Rp -
Pekerja Oh 0.166 Rp 25,000 Rp 4,150
Tukang kayu Oh 0.250 Rp - Rp -
Kepala tukang Oh 0.025 Rp 40,000 Rp 1,000
Tenaga Mandor Oh 0.008 Rp 45,000 Rp 360

10.35 1m' Pasang Nok Genteng Beton Rp 4,000 Rp 11,700


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Genteng Beton lbr 3.500 Rp - Rp -
Paku Biasa 2" - 5" Kg 0.050 Rp - Rp -
Semen abu -abu Kg 10.800 Rp - Rp -
Pasir Pasang m3 0.032 Rp 125,000 Rp 4,000
Bahan Semen Warna Kg 1.000 Rp - Rp -
Pekerja Oh 0.400 Rp 25,000 Rp 10,000
Tukang kayu Oh 0.200 Rp - Rp -
Kepala tukang Oh 0.020 Rp 40,000 Rp 800
Tenaga Mandor Oh 0.020 Rp 45,000 Rp 900

10.36 1m' Pasang Nok Genteng Aspal Rp - Rp 4,395


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Genteng Aspal lbr 2.000 Rp - Rp -
Paku Biasa ½" - 1" Kg 0.050 Rp - Rp -
Balok Kayu Borneo Kg 0.004 Rp - Rp -
Tenaga Pekerja Oh 0.125 Rp 25,000 Rp 3,125
Tukang kayu Oh 0.250 Rp - Rp -
Kepala tukang Oh 0.025 Rp 40,000 Rp 1,000
Mandor Oh 0.006 Rp 45,000 Rp 270

10.37 1m' Pasang Nok Genteng Metal Rp - Rp 7,435


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Genteng Decra Bond lbr 1.100 Rp - Rp -
Bahan Paku Biasa ½" - 1" Kg 0.050 Rp - Rp -
Pekerja Oh 0.250 Rp 25,000 Rp 6,250
Tukang kayu Oh 0.150 Rp - Rp -
Kepala tukang Oh 0.015 Rp 40,000 Rp 600
Tenaga Mandor Oh 0.013 Rp 45,000 Rp 585

10.38 1m' Pasang Nok Genteng Metal Rp - Rp 7,435


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Spesialis Infrastruktur NMC PNPM-MPd Page 195 of 289


Menghitung Harga Satuan Pekerjaan

Genteng Decra Bond lbr 1.100 Rp - Rp -


Bahan Paku Biasa ½" - 1" Kg 0.050 Rp - Rp -
Pekerja Oh 0.250 Rp 25,000 Rp 6,250
Tukang kayu Oh 0.150 Rp - Rp -
Kepala tukang Oh 0.015 Rp 40,000 Rp 600
Tenaga Mandor Oh 0.013 Rp 45,000 Rp 585

10.39 1m' Pasang Nok Sirap Rp - Rp 4,395


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Seng Plat 3" x 6" BJLS 28 Lbr 0.400 Rp - Rp -
Paku Biasa ½" - 1" Kg 0.060 Rp - Rp -
Paku Biasa 2" - 5" Kg 0.050 Rp - Rp -
Bahan Papan Kayu Borneo tebal 3cm m3 0.004 Rp - Rp -
Pekerja Oh 0.125 Rp 25,000 Rp 3,125
Tukang kayu Oh 0.250 Rp - Rp -
Kepala tukang Oh 0.025 Rp 40,000 Rp 1,000
Tenaga Mandor Oh 0.006 Rp 45,000 Rp 270

10.40 1m² Pasang Atap Seng Gelombang Rp - Rp 3,510


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Seng Gelombang 3" x 6" BJLS 28 Lbr 0.700 Rp - Rp -
Bahan Paku Biasa ½" - 1" Kg 0.020 Rp - Rp -
Pekerja Oh 0.120 Rp 25,000 Rp 3,000
Tukang kayu Oh 0.060 Rp - Rp -
Kepala tukang Oh 0.006 Rp 40,000 Rp 240
Tenaga Mandor Oh 0.006 Rp 45,000 Rp 270

10.41 1m² Pasang Atap Nok Seng Rp - Rp 965


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Seng Plat 3" x 6" BJLS 28 Lbr 0.300 Rp - Rp -
Bahan Paku Biasa ½" - 1" Kg 0.040 Rp - Rp -
Pekerja Oh 0.015 Rp 25,000 Rp 375
Tukang kayu Oh 0.070 Rp - Rp -
Kepala tukang Oh 0.008 Rp 40,000 Rp 320
Tenaga Mandor Oh 0.006 Rp 45,000 Rp 270

10.42 1m² Pasang Atap Alluminium Rp - Rp 965


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Atap Alluminium Gelombang tebal 0 m2 1.050 Rp - Rp -
Bahan Paku Hak Pnjang 15 cm Kg 0.020 Rp - Rp -
Pekerja Oh 0.015 Rp 25,000 Rp 375
Tukang kayu Oh 0.075 Rp - Rp -
Kepala tukang Oh 0.008 Rp 40,000 Rp 320
Tenaga Mandor Oh 0.006 Rp 45,000 Rp 270

10.43 1m² Pasang Nok Alluminium Rp - Rp 3,350

Spesialis Infrastruktur NMC PNPM-MPd Page 196 of 289


Menghitung Harga Satuan Pekerjaan

Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Nok standar 40 cm 18, swg 22 m2 1.200 Rp - Rp -
Bahan Paku Hak Pnjang 15 cm Kg 0.040 Rp - Rp -
Pekerja Oh 0.100 Rp 25,000 Rp 2,500
Tukang kayu Oh 1.000 Rp - Rp -
Kepala tukang Oh 0.010 Rp 40,000 Rp 400
Tenaga Mandor Oh 0.010 Rp 45,000 Rp 450

10.44 1m² Pasang Alluminium Foil / Sisalation Rp - Rp 4,310


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Sisalation / Alluminium Foil m2 1.050 Rp - Rp -
Pekerja Oh 0.150 Rp 25,000 Rp 3,750
Tukang kayu Oh 0.050 Rp - Rp -
Kepala tukang Oh 0.005 Rp 40,000 Rp 200
Tenaga Mandor Oh 0.008 Rp 45,000 Rp 360

XI. PEKERJAAN SANITASI


RSNI. T-15-2002

11.1 Memasang 1 buah Kloset Duduk / Monoblok Rp - Rp 128,240


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kloset Duduk / Monoblok bh 1.000 Rp - Rp -
Bahan Perlengkapan 30% Dari bahan Rp - Rp -
Pekerja Oh 3.300 Rp 25,000 Rp 82,500
Tukang batu Oh 1.100 Rp 35,000 Rp 38,500
Kepala tukang Oh 0.001 Rp 40,000 Rp 40
Tenaga Mandor Oh 0.160 Rp 45,000 Rp 7,200

11.2 Memasang 1 buah Kloset Jongkok Porselen Rp 1,250 Rp 144,700


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kloset Jongkok Porselen bh 1.000 Rp - Rp -
Semen Portland Kg 6.000 Rp - Rp -
Bahan Pasir Pasang m3 0.010 Rp 125,000 Rp 1,250
Pekerja Oh 1.000 Rp 25,000 Rp 25,000
Tukang batu Oh 1.500 Rp 35,000 Rp 52,500
Kepala tukang Oh 1.500 Rp 40,000 Rp 60,000
Tenaga Mandor Oh 0.160 Rp 45,000 Rp 7,200

11.3 Memasang 1 buah Kloset Jongkok Teraso Rp 1,250 Rp 94,450


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kloset Jongkok Teraso bh 1.000 Rp - Rp -
Bata merah bh 7.000 Rp - Rp -
Semen Portland Kg 6.000 Rp - Rp -
Bahan Pasir Pasang m3 0.010 Rp 125,000 Rp 1,250
Pekerja Oh 1.000 Rp 25,000 Rp 25,000

Spesialis Infrastruktur NMC PNPM-MPd Page 197 of 289


Tenaga
Menghitung Harga Satuan Pekerjaan

Tukang batu Oh 1.500 Rp 35,000 Rp 52,500


Kepala tukang Oh 0.300 Rp 40,000 Rp 12,000
Tenaga Mandor Oh 0.110 Rp 45,000 Rp 4,950

11.4 Memasang 1 buah Urinoir Rp 1,250 Rp 68,500


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Urinoir bh 1.000 Rp - Rp -
Perlengkapan Rp -
Semen Portland Kg 6.000 Rp - Rp -
Bahan Pasir Pasang m3 0.010 Rp 125,000 Rp 1,250
Pekerja Oh 1.000 Rp 25,000 Rp 25,000
Tukang batu Oh 1.000 Rp 35,000 Rp 35,000
Kepala tukang Oh 0.100 Rp 40,000 Rp 4,000
Tenaga Mandor Oh 0.100 Rp 45,000 Rp 4,500

11.5 Memasang 1 buah Wastafel Rp 1,250 Rp 86,250


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Urinoir bh 1.000 Rp - Rp -
Perlengkapan
Semen Abu -abu Kg 6.000 Rp - Rp -
Bahan Pasir Pasang m3 0.010 Rp 125,000 Rp 1,250
Pekerja Oh 1.000 Rp 25,000 Rp 25,000
Tukang batu Oh 1.450 Rp 35,000 Rp 50,750
Kepala tukang Oh 0.150 Rp 40,000 Rp 6,000
Tenaga Mandor Oh 0.100 Rp 45,000 Rp 4,500

11.6 Memasang 1 buah Bak Mandi Teraso, volume 0.30 m³ Rp 1,250 Rp 86,500
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bak Teraso bh 1.000 Rp - Rp -
Semen Portland Kg 6.000 Rp - Rp -
Bahan Pasir Pasang m3 0.010 Rp 125,000 Rp 1,250
Pekerja Oh 2.100 Rp 25,000 Rp 52,500
Tukang batu Oh 0.750 Rp 35,000 Rp 26,250
Kepala tukang Oh 0.070 Rp 40,000 Rp 2,800
Tenaga Mandor Oh 0.110 Rp 45,000 Rp 4,950

11.7 Memasang 1 buah Bak Mandi Fiberglass, volume 0.30 m³ Rp - Rp 166,050


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bak Fiberglass bh 1.000 Rp - Rp -
Bahan Perlengkapan Rp -
Pekerja Oh 1.800 Rp 25,000 Rp 45,000
Tukang batu Oh 2.700 Rp 35,000 Rp 94,500
Kepala tukang Oh 0.540 Rp 40,000 Rp 21,600
Tenaga Mandor Oh 0.110 Rp 45,000 Rp 4,950

11.8 Memasang 1 buah Bak Mandi Batu bata, volume 0.30 m³ Rp 37,500 Rp 280,500

Spesialis Infrastruktur NMC PNPM-MPd Page 198 of 289


Menghitung Harga Satuan Pekerjaan

Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah m3 0.400 Rp - Rp -
Semen Portland Kg 120.000 Rp - Rp -
Pasir Pasang m3 0.300 Rp 125,000 Rp 37,500
Porselen ( 11 x 11 ) cm bh 360.000 Rp - Rp -
Bahan Semen Nat Kg 6.000 Rp - Rp -
Pekerja Oh 6.000 Rp 25,000 Rp 150,000
Tukang batu Oh 3.000 Rp 35,000 Rp 105,000
Kepala tukang Oh 0.300 Rp 40,000 Rp 12,000
Tenaga Mandor Oh 0.300 Rp 45,000 Rp 13,500

11.9 Memasang 1 buah Badkip Porselen Rp - Rp 43,875


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Badkip bh 1.000 Rp - Rp -
Bahan Perlengkapan Rp -
Pekerja Oh Rp 25,000 Rp -
Tukang batu Oh 0.075 Rp 35,000 Rp 2,625
Kepala tukang Oh 0.750 Rp 40,000 Rp 30,000
Tenaga Mandor Oh 0.250 Rp 45,000 Rp 11,250

11.10 Memasang 1 buah Bak Fiberglass volume 1 m³ air Rp - Rp 309,000


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bak Fiberglass bh 1.000 Rp - Rp -
Bahan Perlengkapan Rp -
Pekerja Oh 3.000 Rp 25,000 Rp 75,000
Tukang batu Oh 4.500 Rp 35,000 Rp 157,500
Kepala tukang Oh 0.900 Rp 40,000 Rp 36,000
Tenaga Mandor Oh 0.900 Rp 45,000 Rp 40,500

11.11 Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa Tanah Ø15 cm Rp 1,625 Rp 2,783
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa Tanah bh 1.600 Rp - Rp -
Semen Portland Kg 0.680 Rp - Rp -
Pasir Pasang m3 0.013 Rp 125,000 Rp 1,625
Bahan Pasir Urug m3 0.011 Rp - Rp -
Pekerja Oh 0.060 Rp 25,000 Rp 1,500
Tukang batu Oh 0.030 Rp 35,000 Rp 1,050
Kepala tukang Oh 0.003 Rp 40,000 Rp 120
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 113

11.12 Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa Tanah Ø 20 cm Rp 1,750 Rp 3,875
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa Tanah bh 1.600 Rp - Rp -
Semen Portland Kg 0.870 Rp - Rp -
Pasir Pasang m3 0.014 Rp 125,000 Rp 1,750
Bahan

Spesialis Infrastruktur NMC PNPM-MPd Page 199 of 289


Menghitung Harga Satuan Pekerjaan

Bahan Pasir Urug m3 0.014 Rp - Rp -


Pekerja Oh 0.080 Rp 25,000 Rp 2,000
Tukang batu Oh 0.040 Rp 35,000 Rp 1,400
Kepala tukang Oh 0.004 Rp 40,000 Rp 160
Tenaga Mandor Oh 0.007 Rp 45,000 Rp 315

11.13 Memasang 1 m' Pipa Beton Ø 5 cm - 20 cm Rp 7,000 Rp 6,545


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa Beton bh 1.100 Rp - Rp -
Bata merah m3 0.270 Rp - Rp -
Semen Portland Kg 3.920 Rp - Rp -
Pasir Pasang m3 0.056 Rp 125,000 Rp 7,000
Bahan Pasir Urug m3 0.024 Rp - Rp -
Pekerja Oh 0.140 Rp 25,000 Rp 3,500
Tukang batu Oh 0.070 Rp 35,000 Rp 2,450
Kepala tukang Oh 0.007 Rp 40,000 Rp 280
Tenaga Mandor Oh 0.007 Rp 45,000 Rp 315

11.14 Memasang 1 m' Pipa Beton Ø 30 cm - 100 cm Rp 7,625 Rp 17,765


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa Beton bh 1.100 Rp - Rp -
Bata merah m3 0.550 Rp - Rp -
Semen Portland Kg 10.300 Rp - Rp -
Pasir Pasang m3 0.061 Rp 125,000 Rp 7,625
Bahan Pasir Urug m3 0.069 Rp - Rp -
Pekerja Oh 0.380 Rp 25,000 Rp 9,500
Tukang batu Oh 0.190 Rp 35,000 Rp 6,650
Kepala tukang Oh 0.019 Rp 40,000 Rp 760
Tenaga Mandor Oh 0.019 Rp 45,000 Rp 855

11.15 Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t = 35cm Rp 8,750 Rp 116,305
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah m3 0.145 Rp - Rp -
Semen Portland Kg 44.000 Rp - Rp -
Pasir Pasang m3 0.070 Rp 125,000 Rp 8,750
Batu Kerikil m3 0.070 Rp - Rp -
Besi beton Kg 1.600 Rp - Rp -
Bahan Pasir beton m3 0.060 Rp - Rp -
Pekerja Oh 3.200 Rp 25,000 Rp 80,000
Tukang batu Oh 1.015 Rp 35,000 Rp 35,525
Kepala tukang Oh 0.002 Rp 40,000 Rp 60
Tenaga Mandor Oh 0.016 Rp 45,000 Rp 720

11.16 Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50cm Rp 16,250 Rp 57,130
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah m3 0.250 Rp - Rp -
Semen Portland Kg 77.000 Rp - Rp -

Spesialis Infrastruktur NMC PNPM-MPd Page 200 of 289


Bahan
Menghitung Harga Satuan Pekerjaan

Pasir Pasang m3 0.130 Rp 125,000 Rp 16,250


Batu Kerikil m3 0.020 Rp - Rp -
Besi beton Kg 2.600 Rp - Rp -
Bahan Pasir beton m3 0.090 Rp - Rp -
Pekerja Oh 1.420 Rp 25,000 Rp 35,500
Tukang batu Oh 0.473 Rp 35,000 Rp 16,555
Kepala tukang Oh 0.047 Rp 40,000 Rp 1,880
Tenaga Mandor Oh 0.071 Rp 45,000 Rp 3,195

11.17 Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (60 x 60 )cm, t = 65cm Rp 23,000 Rp 86,940
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bata merah m3 0.371 Rp - Rp -
Semen Portland Kg 114.000 Rp - Rp -
Pasir Pasang m3 0.184 Rp 125,000 Rp 23,000
Batu Koral m3 0.033 Rp - Rp -
Besi beton Kg 4.850 Rp - Rp -
Bahan Pasir beton m3 0.120 Rp - Rp -
Pekerja Oh 2.160 Rp 25,000 Rp 54,000
Tukang batu Oh 0.720 Rp 35,000 Rp 25,200
Kepala tukang Oh 0.072 Rp 40,000 Rp 2,880
Mandor Oh 0.108 Rp 45,000 Rp 4,860
Tenaga Tukang Gali Oh 0.100 Rp - Rp -

11.18 Memasang 1 m' Pipa Galvanis Ø ½" Rp - Rp 6,075


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa Galvanis m' 1.200 Rp - Rp -
Bahan Perlengkapan Rp -
Pekerja Oh 0.054 Rp 25,000 Rp 1,350
Tukang batu Oh 0.090 Rp 35,000 Rp 3,150
Kepala tukang Oh 0.009 Rp 40,000 Rp 360
Tenaga Mandor Oh 0.027 Rp 45,000 Rp 1,215

11.19 Memasang 1 m' Pipa Galvanis Ø ¾" Rp - Rp 6,075


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa Galvanis m' 1.200 Rp - Rp -
Bahan Perlengkapan Rp -
Pekerja Oh 0.054 Rp 25,000 Rp 1,350
Tukang batu Oh 0.090 Rp 35,000 Rp 3,150
Kepala tukang Oh 0.009 Rp 40,000 Rp 360
Tenaga Mandor Oh 0.027 Rp 45,000 Rp 1,215

11.20 Memasang 1 m' Pipa Galvanis Ø 1" Rp - Rp 6,075


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa Galvanis m' 1.200 Rp - Rp -
Bahan Perlengkapan Rp -
Pekerja Oh 0.054 Rp 25,000 Rp 1,350
Tukang batu Oh 0.090 Rp 35,000 Rp 3,150

Tenaga
Spesialis Infrastruktur NMC PNPM-MPd Page 201 of 289
Menghitung Harga Satuan Pekerjaan

Kepala tukang Oh 0.009 Rp 40,000 Rp 360


Tenaga Mandor Oh 0.027 Rp 45,000 Rp 1,215

11.21 Memasang 1 m' Pipa Galvanis Ø 1½" Rp - Rp 9,963


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa Galvanis m' 1.200 Rp - Rp -
Bahan Perlengkapan Rp -
Pekerja Oh 0.108 Rp 25,000 Rp 2,700
Tukang batu Oh 0.180 Rp 35,000 Rp 6,300
Kepala tukang Oh 0.018 Rp 40,000 Rp 720
Tenaga Mandor Oh 0.005 Rp 45,000 Rp 243

11.22 Memasang 1 m' Pipa Galvanis Ø 3" Rp - Rp 9,963


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa Galvanis m' 1.200 Rp - Rp -
Bahan Perlengkapan Rp -
Pekerja Oh 0.108 Rp 25,000 Rp 2,700
Tukang batu Oh 0.180 Rp 35,000 Rp 6,300
Kepala tukang Oh 0.018 Rp 40,000 Rp 720
Tenaga Mandor Oh 0.005 Rp 45,000 Rp 243

11.23 Memasang 1 m' Pipa Galvanis Ø 4" Rp - Rp 12,456


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa Galvanis D 4" m' 1.200 Rp - Rp -
Bahan Perlengkapan Rp -
Pekerja Oh 0.135 Rp 25,000 Rp 3,375
Tukang batu Oh 0.225 Rp 35,000 Rp 7,875
Kepala tukang Oh 0.023 Rp 40,000 Rp 900
Tenaga Mandor Oh 0.007 Rp 45,000 Rp 306

11.24 Memasang 1 m' Pipa PVC tipe AW Ø ½" Rp - Rp 3,321


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa PVC D 1/2" m' 1.200 Rp - Rp -
Bahan Perlengkapan Rp -
Pekerja Oh 0.036 Rp 25,000 Rp 900
Tukang batu Oh 0.060 Rp 35,000 Rp 2,100
Kepala tukang Oh 0.006 Rp 40,000 Rp 240
Tenaga Mandor Oh 0.002 Rp 45,000 Rp 81

11.25 Memasang 1 m' Pipa PVC tipe AW Ø ¾" Rp - Rp 3,321


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa PVC tipe AW Ø ¾" m' 1.200 Rp - Rp -
Bahan Perlengkapan Rp -
Pekerja Oh 0.036 Rp 25,000 Rp 900
Tukang batu Oh 0.060 Rp 35,000 Rp 2,100
Kepala tukang Oh 0.006 Rp 40,000 Rp 240
Tenaga Mandor Oh 0.002 Rp 45,000 Rp 81

Spesialis Infrastruktur NMC PNPM-MPd Page 202 of 289


Menghitung Harga Satuan Pekerjaan

11.26 Memasang 1 m' Pipa PVC tipe AW Ø 1" Rp - Rp 3,321


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa PVC tipe AW Ø 1" m' 1.200 Rp - Rp -
Bahan Perlengkapan Rp -
Pekerja Oh 0.036 Rp 25,000 Rp 900
Tukang batu Oh 0.060 Rp 35,000 Rp 2,100
Kepala tukang Oh 0.006 Rp 40,000 Rp 240
Tenaga Mandor Oh 0.002 Rp 45,000 Rp 81

11.27 Memasang 1 m' Pipa PVC tipe AW Ø 1½" Rp - Rp 3,321


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa PVC tipe AW Ø 1½" m' 1.200 Rp - Rp - Rp -
Bahan Perlengkapan Rp -
Pekerja Oh 0.036 Rp 25,000 Rp 900
Tukang batu Oh 0.060 Rp 35,000 Rp 2,100
Kepala tukang Oh 0.006 Rp 40,000 Rp 240
Tenaga Mandor Oh 0.002 Rp 45,000 Rp 81

11.28 Memasang 1 m' Pipa PVC tipe AW Ø 2" Rp - Rp 4,982


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa PVC tipe AW Ø 2" m' 1.200 Rp - Rp -
Bahan Perlengkapan Rp -
Pekerja Oh 0.054 Rp 25,000 Rp 1,350
Tukang batu Oh 0.090 Rp 35,000 Rp 3,150
Kepala tukang Oh 0.009 Rp 40,000 Rp 360
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 122

11.29 Memasang 1 m' Pipa PVC tipe AW Ø 2½" Rp - Rp 3,321


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa PVC tipe AW Ø 2½" m' 1.200 Rp - Rp - Rp -
Bahan Perlengkapan Rp -
Pekerja Oh 0.036 Rp 25,000 Rp 900
Tukang batu Oh 0.060 Rp 35,000 Rp 2,100
Kepala tukang Oh 0.006 Rp 40,000 Rp 240
Tenaga Mandor Oh 0.002 Rp 45,000 Rp 81

11.30 Memasang 1 m' Pipa PVC tipe AW Ø 3" Rp - Rp 7,475


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa PVC tipe AW Ø 3" m' 1.200 Rp - Rp - Rp -
Bahan Perlengkapan Rp -
Pekerja Oh 0.081 Rp 25,000 Rp 2,025
Tukang batu Oh 0.135 Rp 35,000 Rp 4,725
Kepala tukang Oh 0.014 Rp 40,000 Rp 540
Tenaga Mandor Oh 0.004 Rp 45,000 Rp 185

11.31 Memasang 1 m' Pipa PVC tipe AW Ø 4" Rp - Rp 7,475

Spesialis Infrastruktur NMC PNPM-MPd Page 203 of 289


Menghitung Harga Satuan Pekerjaan

Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pipa PVC tipe AW Ø 4" m' 1.200 Rp - Rp - Rp -
Bahan Perlengkapan Rp -
Pekerja Oh 0.081 Rp 25,000 Rp 2,025
Tukang batu Oh 0.135 Rp 35,000 Rp 4,725
Kepala tukang Oh 0.014 Rp 40,000 Rp 540
Tenaga Mandor Oh 0.004 Rp 45,000 Rp 185

11.32 Memasang 1 bh Bak Cuci Piring Stainles Steel Rp - Rp 12,518


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bak cuci Stainless steel bh 1.000 Rp - Rp -
Bahan Water Drain + Asesories set 1.000 Rp - Rp -
Pekerja Oh 0.030 Rp 25,000 Rp 750
Tukang batu Oh 0.300 Rp 35,000 Rp 10,500
Kepala tukang Oh 0.030 Rp 40,000 Rp 1,200
Tenaga Mandor Oh 0.002 Rp 45,000 Rp 68

11.33 Memasang 1 bh Bak Cuci Piring Teraso Rp 6,250 Rp 20,863


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bak cuci Teraso bh 1.000 Rp - Rp -
Water Drain + Asesories set 1.000 Rp - Rp -
Semen Portland Kg 20.000 Rp - Rp -
Bahan Pasir Pasang m3 0.050 Rp 125,000 Rp 6,250
Pekerja Oh 0.050 Rp 25,000 Rp 1,250
Tukang batu Oh 0.500 Rp 35,000 Rp 17,500
Kepala tukang Oh 0.050 Rp 40,000 Rp 2,000
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 113

11.34 Memasang 1 bh Kran Ø ¾" atau ½" Rp - Rp 4,375


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kran Air bh 1.000 Rp - Rp -
Bahan Seal tape bh 0.025 Rp - Rp -
Pekerja Oh 0.010 Rp 25,000 Rp 250
Tukang batu Oh 0.100 Rp 35,000 Rp 3,500
Kepala tukang Oh 0.010 Rp 40,000 Rp 400
Tenaga Mandor Oh 0.005 Rp 45,000 Rp 225

11.35 Memasang 1 bh Floor Drain Rp - Rp 4,375


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Floor Drain bh 1.000 Rp - Rp -
Pekerja Oh 0.010 Rp 25,000 Rp 250
Tukang batu Oh 0.100 Rp 35,000 Rp 3,500
Kepala tukang Oh 0.010 Rp 40,000 Rp 400
Tenaga Mandor Oh 0.005 Rp 45,000 Rp 225

XII. PEKERJAAN KUNCI DAN KACA


Spesialis Infrastruktur NMC PNPM-MPd Page 204 of 289
Menghitung Harga Satuan Pekerjaan

PT. T-30.2000-C
12.1 1 Buah Pasang kunci Tanam Antik Rp - Rp 4,035
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan kunci Tanam Antik Bh 1.000 Rp - Rp -
Pekerja Oh 0.060 Rp 25,000 Rp 1,500
Tukang kayu Oh 0.600 Rp - Rp -
Kepala tukang Oh 0.060 Rp 40,000 Rp 2,400
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 135

12.2 1 Buah Pasang kunci Tanam Biasa Rp - Rp 875


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan kunci Tanam Biasa Bh 1.000 Rp - Rp -
Pekerja Oh 0.010 Rp 25,000 Rp 250
Tukang kayu Oh 0.500 Rp - Rp -
Kepala tukang Oh 0.010 Rp 40,000 Rp 400
Tenaga Mandor Oh 0.005 Rp 45,000 Rp 225

12.3 1 Buah Pasang kunci Tanam Kamar Mandi Rp - Rp 438


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan kunci Tanam Kamar Mandi Bh 1.000 Rp - Rp -
Pekerja Oh 0.005 Rp 25,000 Rp 125
Tukang kayu Oh 0.500 Rp - Rp -
Kepala tukang Oh 0.005 Rp 40,000 Rp 200
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 113

12.4 1 Buah Pasang kunci Silinder Rp - Rp 336


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan kunci Silinder Bh 1.000 Rp - Rp -
Pekerja Oh 0.005 Rp 25,000 Rp 125
Tukang kayu Oh 0.500 Rp - Rp -
Kepala tukang Oh 0.005 Rp 40,000 Rp 200
Tenaga Mandor Oh 0.000 Rp 45,000 Rp 11

12.5 1 Buah Pasang Engsel Pintu Rp - Rp 1,009


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Engsel Pintu Bh 1.000 Rp - Rp -
Pekerja Oh 0.015 Rp 25,000 Rp 375
Tukang kayu Oh 0.150 Rp - Rp -
Kepala tukang Oh 0.015 Rp 40,000 Rp 600
Tenaga Mandor Oh 0.001 Rp 45,000 Rp 34

12.6 1 Buah Pasang Engsel Jendela Kupu - kupu Rp - Rp 673


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Engsel Jendela Bh 1.000 Rp - Rp -
Pekerja Oh 0.010 Rp 25,000 Rp 250

Spesialis
TenagaInfrastruktur NMC PNPM-MPd Page 205 of 289
Menghitung Harga Satuan Pekerjaan

Tukang kayu Oh 0.100 Rp - Rp -


Kepala tukang Oh 0.010 Rp 40,000 Rp 400
Tenaga Mandor Oh 0.001 Rp 45,000 Rp 23

12.7 1 Buah Pasang Engsel Angin Rp - Rp 1,750


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Engsel Angin Bh 1.000 Rp - Rp -
Pekerja Oh 0.020 Rp 25,000 Rp 500
Tukang kayu Oh 0.200 Rp - Rp -
Kepala tukang Oh 0.020 Rp 40,000 Rp 800
Tenaga Mandor Oh 0.010 Rp 45,000 Rp 450

12.8 1 Buah Pasang Spring Knip Rp - Rp 1,009


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Spring Knip Bh 1.000 Rp - Rp -
Pekerja Oh 0.015 Rp 25,000 Rp 375
Tukang kayu Oh 0.150 Rp - Rp -
Kepala tukang Oh 0.015 Rp 40,000 Rp 600
Tenaga Mandor Oh 0.001 Rp 45,000 Rp 34

12.9 1 Buah Pasang Kait angin Rp - Rp 1,009


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kait Angin Bh 1.000 Rp - Rp -
Pekerja Oh 0.015 Rp 25,000 Rp 375
Tukang kayu Oh 0.150 Rp - Rp -
Kepala tukang Oh 0.015 Rp 40,000 Rp 600
Tenaga Mandor Oh 0.001 Rp 45,000 Rp 34

12.10 1 Buah Pasang Door Closer Rp - Rp 3,363


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Door Closer Bh 1.000 Rp - Rp -
Pekerja Oh 0.050 Rp 25,000 Rp 1,250
Tukang kayu Oh 0.500 Rp - Rp -
Kepala tukang Oh 0.050 Rp 40,000 Rp 2,000
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 113

12.11 1 Buah Pasang Kunci Selot Rp - Rp 1,345


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kunci Selot Bh 1.000 Rp - Rp -
Pekerja Oh 0.020 Rp 25,000 Rp 500
Tukang kayu Oh 0.200 Rp - Rp -
Kepala tukang Oh 0.020 Rp 40,000 Rp 800
Tenaga Mandor Oh 0.001 Rp 45,000 Rp 45

12.12 1 Buah Pasang Pegangan Pintu / Door Holder Rp - Rp 3,363


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Door Holder Bh 1.000 Rp - Rp -

Spesialis Infrastruktur NMC PNPM-MPd Page 206 of 289


Menghitung Harga Satuan Pekerjaan

Pekerja Oh 0.050 Rp 25,000 Rp 1,250


Tukang kayu Oh 0.500 Rp - Rp -
Kepala tukang Oh 0.050 Rp 40,000 Rp 2,000
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 113

12.13 1 Buah Pasang Door Stop Rp - Rp 673


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Door Stop Bh 1.000 Rp - Rp -
Pekerja Oh 0.010 Rp 25,000 Rp 250
Tukang kayu Oh 0.100 Rp - Rp -
Kepala tukang Oh 0.010 Rp 40,000 Rp 400
Tenaga Mandor Oh 0.001 Rp 45,000 Rp 23

12.14 1 Buah Pasang Rel Pintu Dorong Rp - Rp 4,035


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Rel Pintu Dorong Bh 1.000 Rp - Rp -
Pekerja Oh 0.060 Rp 25,000 Rp 1,500
Tukang kayu Oh 0.600 Rp - Rp -
Kepala tukang Oh 0.060 Rp 40,000 Rp 2,400
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 135

12.15 1 Buah Pasang Kunci Lemari Rp - Rp 1,681


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kunci Lemari Bh 1.000 Rp - Rp -
Pekerja Oh 0.025 Rp 25,000 Rp 625
Tukang kayu Oh 0.250 Rp - Rp -
Kepala tukang Oh 0.025 Rp 40,000 Rp 1,000
Tenaga Mandor Oh 0.001 Rp 45,000 Rp 56

12.16 1 Buah Pasang Kaca tebal 3 mm Rp - Rp 1,009


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kaca Polos m2 1.100 Rp - Rp -
Pekerja Oh 0.015 Rp 25,000 Rp 375
Tukang kayu Oh 0.150 Rp - Rp -
Kepala tukang Oh 0.015 Rp 40,000 Rp 600
Tenaga Mandor Oh 0.001 Rp 45,000 Rp 34

12.17 1 Buah Pasang Kaca tebal 5 mm Rp - Rp 1,009


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kaca Polos m2 1.100 Rp - Rp -
Pekerja Oh 0.015 Rp 25,000 Rp 375
Tukang kayu Oh 0.150 Rp - Rp -
Kepala tukang Oh 0.015 Rp 40,000 Rp 600
Tenaga Mandor Oh 0.001 Rp 45,000 Rp 34

12.18 1 Buah Pasang Kaca tebal 8 mm Rp - Rp 1,109


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah

Spesialis Infrastruktur NMC PNPM-MPd Page 207 of 289


Menghitung Harga Satuan Pekerjaan

Bahan Kaca Polos m2 1.100 Rp - Rp -


Pekerja Oh 0.017 Rp 25,000 Rp 413
Tukang kayu Oh 0.165 Rp - Rp -
Kepala tukang Oh 0.017 Rp 40,000 Rp 660
Tenaga Mandor Oh 0.001 Rp 45,000 Rp 36

12.19 1 Buah Pasang Kaca Buram tebal 12 mm Rp - Rp 1,681


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kaca Buram m2 1.100 Rp - Rp -
Pekerja Oh 0.025 Rp 25,000 Rp 625
Tukang kayu Oh 0.250 Rp - Rp -
Kepala tukang Oh 0.025 Rp 40,000 Rp 1,000
Tenaga Mandor Oh 0.001 Rp 45,000 Rp 56

12.20 1 Buah Pasang Kaca Cermin tebal 5 mm Rp - Rp 1,009


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kaca Cermin m2 1.100 Rp - Rp -
Pekerja Oh 0.015 Rp 25,000 Rp 375
Tukang kayu Oh 0.150 Rp - Rp -
Kepala tukang Oh 0.015 Rp 40,000 Rp 600
Tenaga Mandor Oh 0.001 Rp 45,000 Rp 34

12.21 1 Buah Pasang Kaca Cermin tebal 6 mm Rp - Rp 1,009


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kaca Cermin m2 1.100 Rp - Rp -
Pekerja Oh 0.015 Rp 25,000 Rp 375
Tukang kayu Oh 0.150 Rp - Rp -
Kepala tukang Oh 0.015 Rp 40,000 Rp 600
Tenaga Mandor Oh 0.001 Rp 45,000 Rp 34

12.22 1 Buah Pasang Kaca Cermin tebal 8 mm Rp - Rp 1,109


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kaca Cermin m2 1.100 Rp - Rp -
Pekerja Oh 0.017 Rp 25,000 Rp 413
Tukang kayu Oh 0.165 Rp - Rp -
Kepala tukang Oh 0.017 Rp 40,000 Rp 660
Tenaga Mandor Oh 0.001 Rp 45,000 Rp 36

12.23 1 Buah Pasang Kaca Wireglass tebal 5 mm Rp - Rp 1,009


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kaca Wireglass m2 1.100 Rp - Rp -
Pekerja Oh 0.015 Rp 25,000 Rp 375
Tukang kayu Oh 0.150 Rp - Rp -
Kepala tukang Oh 0.015 Rp 40,000 Rp 600
Tenaga Mandor Oh 0.001 Rp 45,000 Rp 34

12.24 1 Buah Pasang Kaca Patri tebal 5 mm Rp - Rp 1,009

Spesialis Infrastruktur NMC PNPM-MPd Page 208 of 289


Menghitung Harga Satuan Pekerjaan

Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kaca Patri m2 1.100 Rp - Rp -
Pekerja Oh 0.015 Rp 25,000 Rp 375
Tukang kayu Oh 0.150 Rp - Rp -
Kepala tukang Oh 0.015 Rp 40,000 Rp 600
Tenaga Mandor Oh 0.001 Rp 45,000 Rp 34

XIII. PEKERJAAN PENGECATAN


PT. T.38-2000-C
13.1 1 m² Mengikis / Mengerok Permukaan Cat Tembok Lama Rp - Rp 3,863
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Soda Api Kg 0.050 Rp - Rp -
Pekerja Oh 0.150 Rp 25,000 Rp 3,750
Tukang Cat Oh Rp - Rp -
Kepala tukang Oh Rp 40,000 Rp -
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 113

13.2 1 m² Mencuci Bidang Permukaan Tembok yang Pernah dicat Rp 3,750 Rp 113
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Sabun Kg 0.050 Rp - Rp -
Pekerja Oh 0.150 Rp 25,000 Rp 3,750
Tukang Cat Oh Rp - Rp -
Kepala tukang Oh Rp 40,000 Rp -
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 113

13.3 1 m² Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual Rp - Rp 3,863
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Sabun Kg 0.050 Rp - Rp -
Pekerja Oh 0.150 Rp 25,000 Rp 3,750
Tukang Cat Oh Rp - Rp -
Kepala tukang Oh Rp 40,000 Rp -
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 113

13.4 1 m² Menyabun Permukaan Tembok Lama Rp - Rp 3,863


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Sabun Kg 0.050 Rp - Rp -
Pekerja Oh 0.150 Rp 25,000 Rp 3,750
Tukang Cat Oh Rp - Rp -
Kepala tukang Oh Rp 40,000 Rp -
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 113

13.5 1 m² Mengerok Karat atau Cat Lama Permukaan Baja dgn Pancar Pasir ( Sanblasting ) dgn Tingkat Kebersihan Sa 2½. Rp - Rp 94,500
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pasir Silika Kg 40.000 Rp - Rp -

Spesialis
Bahan Infrastruktur NMC PNPM-MPd Page 209 of 289
Menghitung Harga Satuan Pekerjaan

BBM Ltr 10.000 Rp - Rp -


Peralatan Rp -
Bahan Kompresor, Blasting Pot , Selang Dan Nozzle Rp -
Pekerja Oh 1.600 Rp 25,000 Rp 40,000
Tukang Cat Oh 1.600 Rp - Rp -
Kepala tukang Oh 0.800 Rp 40,000 Rp 32,000
Tenaga Mandor Oh 0.500 Rp 45,000 Rp 22,500

13.6 1 m² Mendempul dan Menggosok Kayu Rp - Rp 1,273


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Dempul Jadi Kg 0.080 Rp - Rp -
Minyak Cat Kg 0.020 Rp - Rp -
Bahan Batu Apung Kg 0.010 Rp - Rp -
Pekerja Oh 0.040 Rp 25,000 Rp 1,000
Tukang Cat Oh 0.040 Rp - Rp -
Kepala tukang Oh 0.004 Rp 40,000 Rp 160
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 113

13.7 1 m² Mengecatan Bidang Kayu Lama Rp - Rp 2,163


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plamir Kg 0.150 Rp - Rp -
Cat Dasar Kg 0.170 Rp - Rp -
Bahan Cat Penutup Kg 0.170 Rp - Rp -
Pekerja Oh 0.070 Rp 25,000 Rp 1,750
Tukang Cat Oh 0.075 Rp - Rp -
Kepala tukang Oh 0.008 Rp 40,000 Rp 300
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 113

13.8 1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup Rp - Rp 2,103
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Cat Meni Kg 0.200 Rp - Rp -
Plamir Kg 0.150 Rp - Rp -
Cat Dasar Kg 0.170 Rp - Rp -
Bahan Cat Kayu glotek Kg 0.260 Rp - Rp -
Pekerja Oh 0.070 Rp 25,000 Rp 1,750
Tukang Cat Oh 0.009 Rp - Rp -
Kepala tukang Oh 0.006 Rp 40,000 Rp 240
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 113

13.9 1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup Rp - Rp 2,023
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Cat Meni Kg 0.200 Rp - Rp -
Plamir Kg 0.150 Rp - Rp -
Cat Dasar Kg 0.170 Rp - Rp -
Bahan Cat Kayu glotek Kg 0.350 Rp - Rp -
Pekerja Oh 0.070 Rp 25,000 Rp 1,750
Tukang Cat Oh 0.105 Rp - Rp -

Tenaga
Spesialis Infrastruktur NMC PNPM-MPd Page 210 of 289
Menghitung Harga Satuan Pekerjaan

Kepala tukang Oh 0.004 Rp 40,000 Rp 160


Tenaga Mandor Oh 0.003 Rp 45,000 Rp 113

13.10 1 m² Pelaburan Bidang Kayu dengan Teak Oil Rp - Rp 3,633


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Teak Oil Ltr 0.360 Rp - Rp -
Pekerja Oh 0.040 Rp 25,000 Rp 1,000
Tukang Cat Oh 0.063 Rp - Rp -
Kepala tukang Oh 0.063 Rp 40,000 Rp 2,520
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 113

13.11 1 m² Pelaburan Bidang Kayu dengan Pelitur Rp - Rp 3,633


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pelitur Ltr 0.150 Rp - Rp -
Pelitur Jadi Ltr 0.372 Rp - Rp -
Bahan Ampelas Lbr 2.000 Rp - Rp -
Pekerja Oh 0.040 Rp 25,000 Rp 1,000
Tukang Cat Oh 0.063 Rp - Rp -
Kepala tukang Oh 0.063 Rp 40,000 Rp 2,520
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 113

13.12 1 m² Pelaburan Bidang Kayu dengan Cat Residu dan Ter Rp - Rp 2,770
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Residu atau Ter Ltr 0.350 Rp - Rp -
Pekerja Oh 0.100 Rp 25,000 Rp 2,500
Tukang Cat Oh Rp - Rp -
Kepala tukang Oh Rp 40,000 Rp -
Tenaga Mandor Oh 0.006 Rp 45,000 Rp 270

13.13 1 m² Pelaburan Bidang Kayu dengan Vernis Rp - Rp 4,753


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Vernis Ltr 0.150 Rp - Rp -
Dempul Kg 0.050 Rp - Rp -
Ampelas Lbr 0.100 Rp - Rp -
Bahan Kuas Bh 0.010 Rp - Rp -
Pekerja Oh 0.160 Rp 25,000 Rp 4,000
Tukang Cat Oh 0.160 Rp - Rp -
Kepala tukang Oh 0.016 Rp 40,000 Rp 640
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 113

13.14 1 m² Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) Rp - Rp 865
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plamir Kg 0.100 Rp - Rp -
Cat Dasar Kg 0.100 Rp - Rp -
Bahan Cat Tembok Kg 0.260 Rp - Rp -
Pekerja Oh 0.020 Rp 25,000 Rp 500

Spesialis
TenagaInfrastruktur NMC PNPM-MPd Page 211 of 289
Menghitung Harga Satuan Pekerjaan

Tukang Cat Oh 0.063 Rp - Rp -


Kepala tukang Oh 0.006 Rp 40,000 Rp 252
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 113

13.15 1 m² Melabur Tembok dengan Kapur Sirih Rp - Rp 3,867


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Ampelas Lbr 0.100 Rp - Rp -
Alang - alang ikat 0.250 Rp - Rp -
Perancah Kayu m3 0.002 Rp - Rp -
Bahan Kapur Sirih Kg 0.150 Rp - Rp -
Pekerja Oh 0.150 Rp 25,000 Rp 3,750
Tukang Cat Oh 0.001 Rp - Rp -
Kepala tukang Oh 0.000 Rp 40,000 Rp 4
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 113

13.16 1 m² Melabur Tembok Lama dengan Kapur Sirih ( untuk pemeliharaan ) Rp - Rp 1,133
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Perancah Kayu m3 0.002 Rp - Rp -
Bahan Kapur Sirih Kg 0.300 Rp - Rp -
Pekerja Oh 0.040 Rp 25,000 Rp 1,000
Tukang Cat Oh 0.005 Rp - Rp -
Kepala tukang Oh 0.001 Rp 40,000 Rp 20
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 113

13.17 1 m² Pemasangan Wall Paper Rp - Rp 693


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Wall Paper m3 1.200 Rp - Rp -
Bahan Perekat Kg 0.200 Rp - Rp -
Pekerja Oh 0.020 Rp 25,000 Rp 500
Tukang Cat Oh 0.200 Rp - Rp -
Kepala tukang Oh 0.002 Rp 40,000 Rp 80
Tenaga Mandor Oh 0.003 Rp 45,000 Rp 113

13.18 1 m² Pengecatan Permukaan Baja dengan Meni Besi Rp - Rp 1,750


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Meni Besi Kg 0.100 Rp - Rp -
Bahan Kuas Bh 0.010 Rp - Rp -
Pekerja Oh 0.020 Rp 25,000 Rp 500
Tukang Cat Oh 0.200 Rp - Rp -
Kepala tukang Oh 0.020 Rp 40,000 Rp 800
Tenaga Mandor Oh 0.010 Rp 45,000 Rp 450

13.19 1 m² Pengecatan Permukaan Baja dengan Meni Besi dan Perancah Rp - Rp 7,488
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Meni Besi Kg 0.100 Rp - Rp -
Kuas Bh 0.010 Rp - Rp -
Bahan Perancah Kayu m3 0.002 Rp - Rp -

Spesialis Infrastruktur NMC PNPM-MPd Page 212 of 289


Menghitung Harga Satuan Pekerjaan

Pekerja Oh 0.250 Rp 25,000 Rp 6,250


Tukang Cat Oh 0.225 Rp - Rp -
Kepala tukang Oh 0.023 Rp 40,000 Rp 900
Tenaga Mandor Oh 0.008 Rp 45,000 Rp 338

13.20 1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 4 Lapis Cat Konvensional, tebal 200 um Rp - Rp 1,388
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Meni ( Read Lead ) A Kg 0.100 Rp - Rp -
Meni ( Read Lead ) B Kg 0.100 Rp - Rp -
Alluminium C Kg 0.040 Rp - Rp -
Alluminium B Kg 0.040 Rp - Rp -
Pengencer Ltr 0.010 Rp - Rp -
Bahan Perancah Kayu m3 0.002 Rp - Rp -
Pekerja Oh 0.006 Rp 25,000 Rp 150
Tukang Cat Oh 0.006 Rp - Rp -
Kepala tukang Oh 0.023 Rp 40,000 Rp 900
Tenaga Mandor Oh 0.008 Rp 45,000 Rp 338

13.21 1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 1 Lapis Cat Mutakhir, tebal 200 um Rp - Rp 900
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Meni Besi Kg 0.300 Rp - Rp -
Pekerja Oh 0.006 Rp 25,000 Rp 150
Tukang Cat Oh 0.060 Rp - Rp -
Kepala tukang Oh 0.012 Rp 40,000 Rp 480
Tenaga Mandor Oh 0.006 Rp 45,000 Rp 270

13.22 1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 3 Lapis Cat Konvensional, tebal 200 um Rp - Rp 33,500
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Cat Dasar Kg 0.110 Rp - Rp -
Cat Antara Kg 0.170 Rp - Rp -
Bahan Cat Penutup Kg 0.080 Rp - Rp -
Pekerja Oh 0.500 Rp 25,000 Rp 12,500
Tukang Cat Oh 0.800 Rp - Rp -
Kepala tukang Oh 0.300 Rp 40,000 Rp 12,000
Tenaga Mandor Oh 0.200 Rp 45,000 Rp 9,000

13.23 1 m² Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Semprot ( Airless Spray ) dgn Sistem 1 Lapis Cat Mutakhir, tebal 200 u Rp - Rp 27,000
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Cat Dasar Kg 0.300 Rp - Rp -
Pekerja Oh 0.400 Rp 25,000 Rp 10,000
Tukang Cat Oh 0.700 Rp - Rp -
Kepala tukang Oh 0.200 Rp 40,000 Rp 8,000
Tenaga Mandor Oh 0.200 Rp 45,000 Rp 9,000

XIV. PEKERJAAN PERSIAPAN

Spesialis Infrastruktur NMC PNPM-MPd Page 213 of 289


Menghitung Harga Satuan Pekerjaan

RSNI. T-15-2002
14.1 1 m' Pagar Sementara dari Kayu tinggi 2 m Rp - Rp 11,700
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Dolken Kayu Ø 8 - 10/400 cm btg 1.250 Rp - Rp -
Semen Portland Kg 2.500 Rp - Rp -
Pasir beton m3 0.005 Rp - Rp -
Bahan Koral Beton m3 0.009 Rp - Rp -
Kaso 5 / 7 ( albasiah ) m3 0.072 Rp - Rp -
Paku Biasa 2" - 5" Kg 0.060 Rp - Rp -
Residu Lt 0.400 Rp - Rp -
Tukang kayu Oh 0.200 Rp - Rp -
Pekerja Oh 0.400 Rp 25,000 Rp 10,000
Tenaga
Kepala tukang Oh 0.020 Rp 40,000 Rp 800
Mandor Oh 0.020 Rp 45,000 Rp 900

14.2 1 m' Pagar Sementara dari Seng Gelombang tinggi 2 m Rp - Rp 11,700


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Dolken Kayu Ø 8 - 10/400 cm btg 1.250 Rp - Rp -
Semen Portland Kg 2.500 Rp - Rp -
Seng gelombang 3"-5" lbr 1.200 Rp - Rp -
Pasir beton m3 1.200 Rp - Rp -
Bahan
Koral Beton m3 0.009 Rp - Rp -
Kaso 5 / 7 ( albasiah ) m3 0.072 Rp - Rp -
Paku Biasa 2" - 5" Kg 0.060 Rp - Rp -
Meni Besi Lt 0.450 Rp - Rp -
Tukang kayu Oh 0.200 Rp - Rp -
Pekerja Oh 0.400 Rp 25,000 Rp 10,000
Tenaga
Kepala tukang Oh 0.020 Rp 40,000 Rp 800
Mandor Oh 0.020 Rp 45,000 Rp 900

14.3 1 m' Pagar Sementara dari Kawat Duri tinggi 1.8 m Rp - Rp 9,200
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Dolken Kayu Ø 8 - 10/400 cm btg 1.000 Rp - Rp -
Semen Portland Kg 2.000 Rp - Rp -
Kawat Duri Kg 25.000 Rp - Rp -
Pasir beton m3 0.005 Rp - Rp -
Koral Beton m3 0.009 Rp - Rp -
Bahan Paku Biasa 2" - 5" Kg 0.060 Rp - Rp -
Tukang kayu Oh 0.200 Rp - Rp -
Pekerja Oh 0.300 Rp 25,000 Rp 7,500
Kepala tukang Oh 0.020 Rp 40,000 Rp 800
Tenaga Mandor Oh 0.020 Rp 45,000 Rp 900

14.4 1 m' Pek. Pengukuran & Pemasangan Bowplank Rp - Rp 3,125


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu Kaso 5 / 7 (borneo) m3 0.012 Rp - Rp -

Bahan
Spesialis Infrastruktur NMC PNPM-MPd Page 214 of 289
Menghitung Harga Satuan Pekerjaan

Paku Biasa 2" - 5" Kg 0.020 Rp - Rp -


Bahan Kayu Papan 3 / 20 borneo m3 0.007 Rp - Rp -
Tukang kayu Oh 0.100 Rp - Rp -
Pekerja Oh 0.100 Rp 25,000 Rp 2,500
Kepala tukang Oh 0.010 Rp 40,000 Rp 400
Tenaga Mandor Oh 0.005 Rp 45,000 Rp 225

14.5 1 m² Pek. Kantor Direksi Keet , dengan lantai plesteran Rp 18,750 Rp 99,250
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Dolken Kayu Ø 8 - 10/400 cm btg 1.250 Rp - Rp -
Kayu Balok Borneo m3 0.180 Rp - Rp -
Paku Kg 0.850 Rp - Rp -
Besi Strip Kg 1.100 Rp - Rp -
Semen Portland Kg 35.000 Rp - Rp -
Pasir Pasang m3 0.150 Rp 125,000 Rp 18,750
Pasir beton m3 0.100 Rp - Rp -
Koral Beton m3 0.150 Rp - Rp -
Bata merah bh 30.000 Rp - Rp -
Seng Plat lbr 0.250 Rp - Rp -
Jendela nako (rangka + kaca 5 mm) m2 0.500 Rp - Rp -
Kaca Polos m2 0.080 Rp - Rp -
Kunci Tanam bh 0.150 Rp - Rp -
Bahan Plywood 4 mm lbr 0.060 Rp - Rp -
Tukang kayu Oh 2.000 Rp - Rp -
Tukang batu Oh 1.000 Rp 35,000 Rp 35,000
Pekerja Oh 2.000 Rp 25,000 Rp 50,000
Kepala tukang Oh 0.300 Rp 40,000 Rp 12,000
Tenaga Mandor Oh 0.050 Rp 45,000 Rp 2,250

14.6 1 m² Pembuatan Gudang Semen dan Alat - alat Rp - Rp 35,250


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Dolken Kayu Ø 8 - 10/400 cm btg 1.700 Rp - Rp -
Kayu Balok Borneo m3 0.210 Rp - Rp -
Paku Kg 0.300 Rp - Rp -
Semen Portland Kg 10.500 Rp - Rp -
Pasir beton m3 0.030 Rp - Rp -
Koral Beton m3 0.050 Rp - Rp -
Bahan Seng Gelombang BJLS 32 lbr 1.500 Rp - Rp -
Tukang kayu Oh 2.000 Rp - Rp -
Pekerja Oh 1.000 Rp 25,000 Rp 25,000
Kepala tukang Oh 0.200 Rp 40,000 Rp 8,000
Tenaga Mandor Oh 0.050 Rp 45,000 Rp 2,250

14.7 1 m² Pembuatan Rumah Jaga / Konstruksi Kayu Rp - Rp 33,250


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Dolken Kayu Ø 8 - 10/400 cm btg 3.000 Rp - Rp -
Kayu Balok Borneo m3 0.276 Rp - Rp -
Paku Kg 0.700 Rp - Rp -
Bahan

Spesialis Infrastruktur NMC PNPM-MPd Page 215 of 289


Menghitung Harga Satuan Pekerjaan

Bahan Seng Gelombang BJLS 32 lbr 1.500 Rp - Rp -


Tukang kayu Oh 1.500 Rp - Rp -
Pekerja Oh 1.000 Rp 25,000 Rp 25,000
Kepala tukang Oh 0.150 Rp 40,000 Rp 6,000
Tenaga Mandor Oh 0.050 Rp 45,000 Rp 2,250

14.8 1 m2 Membersihkan Lapangan dan Perataan Rp - Rp 4,750


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pekerja Oh 0.100 Rp 25,000 Rp 2,500
Tenaga Mandor Oh 0.050 Rp 45,000 Rp 2,250

14.9 1 m² Pembuatan Bedeng Buruh Rp - Rp 35,250


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Dolken Kayu Ø 8 - 10/400 cm btg 1.250 Rp - Rp -
Kayu Balok Borneo m3 0.186 Rp - Rp -
Paku Kg 0.300 Rp - Rp -
Semen Portland Kg 18.000 Rp - Rp -
Pasir beton m3 0.030 Rp - Rp -
Koral Beton m3 0.050 Rp - Rp -
Seng Gelombang BJLS 32 lbr 1.500 Rp - Rp -
Bahan Plywood 4 mm lbr 1.350 Rp - Rp -
Tukang kayu Oh 2.000 Rp - Rp -
Pekerja Oh 1.000 Rp 25,000 Rp 25,000
Kepala tukang Oh 0.200 Rp 40,000 Rp 8,000
Tenaga Mandor Oh 0.050 Rp 45,000 Rp 2,250

14.10 1 m² Pembuatan Bak Adukan ( 40 x 50 x 20 ) cm Rp - Rp 68


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu Terentang m3 0.036 Rp - Rp -
Paku Kg 0.080 Rp - Rp -
Bahan Kayu Kaso 5 / 7 (borneo) btg 1.000 Rp - Rp -
Tukang kayu Oh 0.030 Rp - Rp -
Tenaga Mandor Oh 0.002 Rp 45,000 Rp 68

14.11 1 m² Pembuatan Stegger dari Bambu, ( 40 x 50 x 20 ) cm Rp - Rp 10,635


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bambu Ø 6 - 8 / 600 cm btg 1.000 Rp - Rp -
Bahan Tali Ijuk Kg 0.250 Rp - Rp -
Tukang kayu Oh 0.017 Rp - Rp -
Pekerja Oh 0.002 Rp 25,000 Rp 50
Kepala tukang Oh 0.250 Rp 40,000 Rp 10,000
Tenaga Mandor Oh 0.013 Rp 45,000 Rp 585

14.12 1 m² Pembuatan Jalan Sementara Rp 1,250 Rp 27,250


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu Belah 5 / 20 m3 0.150 Rp - Rp -
Batu Belah 5 / 7 m3 0.090 Rp - Rp -
Bahan Pasir Pasang m3 0.010 Rp 125,000 Rp 1,250

Spesialis Infrastruktur NMC PNPM-MPd Page 216 of 289


Menghitung Harga Satuan Pekerjaan

Pekerja Oh 1.000 Rp 25,000 Rp 25,000


Tenaga Mandor Oh 0.050 Rp 45,000 Rp 2,250

14.13 1 m³ Bongkaran Beton Bertulang Rp - Rp 181,660


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pekerja Oh 6.667 Rp 25,000 Rp 166,675
Tenaga Mandor Oh 0.333 Rp 45,000 Rp 14,985

14.14 1 m³ Bongkaran Dinding Tembok Bata Merah Rp - Rp 168,160


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pekerja Oh 6.667 Rp 25,000 Rp 166,675
Tenaga Mandor Oh 0.033 Rp 45,000 Rp 1,485

Spesialis Infrastruktur NMC PNPM-MPd Page 217 of 289


Kabupaten : Flores Timur
Kecamatan : ………………………. Take Of Sheet
Desa : ………………………. NO

Perhitungan Volume Sketsa

I
1 Pekerjaan Pembersihan
Luas = 224.00 m2

2 Pekerjaan Pengukuran dan Pemasangan Bouwplank II


9.00
Panjang (P) = 50.00 m' 24.0 4.00 1.30 3.70
6.0
0.3 1.20
Posyandu
0.4 ± 0.00 4.00
2.80 R. Administrasi
- 1.85

10.00

-0.05
8.80 3.00 3.00

elasar
BPD

S
± 0.00

3 Pekerjaan Tanah AULA


- 1.85
- Galian Pondasi Bangunan Utama 3.00 PKK
± 0.00 3.00

Panjang (P) = 87.00


Lebar (L) = 0.50
Tinggi (T) = 0.60 4.00 1.30 3.70
Volume = P x L x t
= 87.00 0.50 0.60
= 26.10

4 Pekerjaan Urugan Tanah Kembali


= 1/3 x Galian Tanah
= 0.33 x 26.10
= 8.70

5 Pekerjaan Urugan Pasir bawah Anstamping


Panjang (P) = 87.00
Lebar (L) = 0.50
Tinggi (T) = 0.05
Volume = P x L x t
= 87.00 0.50 0.05
= 2.18

6 Pekerjaan Urugan Pasir bawah Lantai


Luas (L) = 93.00
Tinggi (T) = 0.05
Volume = L x T
= 93.00 x 0.05
= 4.65
7 Pekerjaan Urugan Tanah peninggian lantai
Luas (L) = 93.00
Tinggi (T) = 0.25
Volume = L x T
= 93.00 x 0.25
= 23.25

8 Pekerjaan anstamping Besi Ø 12 mm - 4


Panjang (P) = 87.00
Lebar (L) = 0.50 Beugel Ø 6 mm
Tinggi (T) = 0.10
Volume = P x L x t
= 87.00 0.50 0.10
= 4.35
Besi Ø 12 mm - 4
± 0.00
9 Pekerjaan Pondasi 1 : 6
- Pondasi Bangunan Utama
Pond. III T1 = - T2 = - - Tanah Urug
Pond. II T1 = 0.60 T2 = 0.60 0.60
Pond. I T1 = 0.60 T2 = 0.60 0.60
Pond. Rolaag T1 = - T2 = - - Pas. Batu 1 : 5
Rata - Rata T Pondasi = 0.60 M'

Panjang (P) = 87.00


Luas (L) = 0.38
Tinggi (T) = 0.60
Volume = P x L x t
= 87.00 x 0.38 x 0.60
= 19.58

10 Pekerjaan Beton, Pembesian dan Bekisting


a). Kolom Praktis
Lebar (L) = 0.10 M
Tebal (b) = 0.10 M
Jumlah klm (n) = 26.00 Bh

Jumlah besi 1 kolom = 4.00 btng


Tinggi klm (tk) = 3.40 M' 0.10
Tul. Pokok
Volume beton (v) = 0.10 x 0.10 x 3.40 x 26.00 Beugel 0.06 4 Ø 12 mm
Ø 6 mm
= 0.88 M3
0.06 0.10
Kebutuhan besi 12 mm (kolom) = 3.70 x 4.00 x 26.00 / 11.5
= 33.46 btg
(Keterangan : 11,90 adalah ukuran panjang 1 staff besi) Panjang 1 Beugel = 34 Cm
Kebutuhan besi 6 mm (beugel) =( 3.40 / 0.20 )x 0.34 x 26.00 / 11.50
= 13.07 btg
(Keterangan : 0.20 adalah jarak antar beugel; 0.5 adalah panjang 1 beugel)
Tebal Selimut Beton = 2 cm

b). Kolom Struktur


Lebar (L) = 0.20 M
Tebal (b) = 0.20 M
Jumlah klm (n) = 2.00 Bh

Jumlah besi 1 kolom = 4.00 btng


Tinggi klm (tk) = 2.92 M'
Volume beton (v) = 0.20 x 0.20 x 2.92 x 2.00
= 0.23 M3
Kebutuhan besi 12 mm (kolom) = 3.22 x 4.00 x 2.00 / 11.5
= 2.24 btg
(Keterangan : 11,90 adalah ukuran panjang 1 staff besi)
Kebutuhan besi 6 mm (beugel) =( 2.92 / 0.20 )x 0.74 x 2.00 / 11.50
= 1.88 btg
(Keterangan : 0.20 adalah jarak antar beugel; 0.5 adalah panjang 1 beugel)
Tebal Selimut Beton = 2 cm
c). Sloof

Lebar (L) = 0.15 M


Tinggi (t) = 0.20 M
Panjang (n) = 87.00 M
Jumlah besi untk Sloof = 4.00 btng
Volume beton (v) = 0.15 x 0.20 x 87.00
0.15
Tul. Pokok
Kebutuhan besi 12 mm
=
=
2.610 M3
87.00 x 4.00 / 11.50 Beugel 0.11 4 Ø 12 mm
Ø 6 mm
= 30.26 btg
(Keterangan : 11,90 adalah ukuran panjang 1 staff besi)
Kebutuhan besi 6 mm (beugel) = 87.00 / 0.20 x 0.64 / 11.5
0.16 0.20
= 24.21 btg

(Keterangan : 0.15 adalah jarak antar beugel; 0.6 adalah panjang 1 beugel)

Panjang 1 Beugel = 64 Cm

d). Latei
Lebar (L) = - M
Tinggi (t) = - M
Panjang (n) = - M
Jumlah besi untk Latei = - btng
Volume beton (v) = - x - x -
= - M3
Kebutuhan besi 12 mm = - x - / 11.50
= - btg
(Keterangan : 11,90 adalah ukuran panjang 1 staff besi)
0.15
Kebutuhan besi 6 mm (beugel) = - / 0.15 x 0.54 / 11.5 Tul. Pokok
= - btg Beugel 0.11 4 Ø 12 mm
Ø 6 mm

0.11 0.15

Panjang 1 Beugel = 54 Cm

e). Ringbalk
Lebar (L) = 0.15 M
Tinggi (t) = 0.20 M
Panjang (n) = 87.00 M
Jumlah besi untk Sloof/Ringbalk = 4.00 btng
Volume beton (v) = 0.15 x 0.20 x 87.00
= 2.61 M3
Kebutuhan besi 12 mm = 87.00 x 4.00 / 11.50

0.15
= 30.26 btg
(Keterangan : 12 adalah ukuran panjang 1 staff besi)
Tul. Pokok
0.11
Kebutuhan besi 6 mm (beugel) = 87.00 / 0.20 x 0.64 / 11.5
= 24.21 btg Beugel 4 Ø 12 mm
Ø 6 mm

0.16 0.20

Panjang 1 Beugel = 64 Cm
0.16 0.20

Panjang 1 Beugel = 64 Cm

f). Gewel R. Utama


Lebar (L) = 0.15 M
Tinggi (t) = 0.15 M
Panjang (n) = 31.56 M
Jumlah besi untk gewel = 4.00 btng
Volume beton (v) = 0.15 x 0.15 x 31.56
= 0.71 M3
Kebutuhan besi 12 mm = 31.56 x 4.00 / 11.50
= 10.98 btg
(Keterangan : 12 adalah ukuran panjang 1 staff besi)
Kebutuhan besi 6 mm (beugel) = 31.56 / 0.20 x 0.54 / 11.5
= 7.41 btg
(Keterangan : 0.15 adalah jarak antar beugel; 0.40 adalah panjang 1 beugel)
0.15
Tul. Pokok
Beugel 0.11 4 Ø 12 mm
Ø 6 mm

0.11 0.15

Panjang 1 Beugel = 54 Cm

g). Gewel Teras


Lebar (L) = 0.15 M
Tinggi (t) = 0.15 M
Panjang (n) = 6.00 M
Jumlah besi untk gewel = 4.00 btng
Volume beton (v) = 0.15 x 0.15 x 6.00
= 0.14 M3
Kebutuhan besi 12 mm = 6.00 x 4.00 / 11.50 0.15
= 2.09 btg Tul. Pokok
(Keterangan : 12 adalah ukuran panjang 1 staff besi) Beugel 0.11 4 Ø 12 mm
Kebutuhan besi 6 mm (beugel) = 6.00 / 0.20 x 0.54 / 11.5 Ø 6 mm
= 1.41 btg
0.11 0.15

Panjang 1 Beugel = 54 Cm

h). Tiang Gewel R. Utama


Lebar (L) = 0.10 M
Tinggi (t) = 0.10 M
Jumlah klm (n) = 1.00 Bh
Jumlah besi 1 kolom = 4.00 btng
Tinggi nok Gewel (tk) = 9.02 M
Volume beton (v) = 0.10 x 0.10 x 9.02 x 1.0
= 0.09 M3
(Keterangan : 0.15 adalah jarak antar beugel; 0.40 adalah panjang 1 beugel)

Kebutuhan besi 12 mm = 9.12 x 4.00 x 1.00 / 11.5


= 3.17 btg
(Keterangan : 12 adalah ukuran panjang 1 staff besi)
Kebutuhan besi 6 mm (beugel) = 9.02 / 0.20 x 0.34 x 1.00 / 11.50
= 1.33 btg
(Keterangan : 0.20 adalah jarak antar beugel; 0.50 adalah panjang 1 beugel)

Total Volume Beton 7.039 M3

Total kebutuhan besi dia 12 mm 112.46 btg

Total kebutuhan besi dia 6 mm 73.52 btg

TOTAL BERAT BESI Ø 12 1,198.36 Kg


TOTAL BERAT BESI Ø 6 195.85 Kg

x 3.2 x 15.00 #REF! m2


D 12 = 10.656 kg/btg x 87.00 #REF! m2
D6 = 2.664 kg/btg x 87.00 #REF! m2
Luas Balok Latai (15/15) = 0.4 x 87.00 34.8 m2
Luas Gewel 10/15 = 0.3 x 37.56 11.3 m2

11 Pekerjaan Dinding
Utama
Panjang = 80.00
Tinggi = 3.00
Luas = P x T
= 80.00 x 3.00
= 240.00 m2
Luas Kap Bata Bangunan Utama
= 28.49 m2 Sisi Kr+Kn+Tengah
Luas Kap Bata Bangunan Aula
= 2.42 m2
Luas Bata Bangunan Aula (Penutup Atap diatas Ringbalk) 0.70
= 15.96 m2

TOTAL = 286.86 m2
Bouvent Kayu Klas I 5/10 = 54 Cm
Luas bukaan (Pintu, Jendela, Kolom, Latei)
Pintu = 23.58 m2
Jendela = 10.92 m2
Boven Batu = 1.58 m2
Ventilasi = - m2
Kolom = - m2
Latei = - m2

Total = 36.07 m2
Luas Pekerjaan dinding = 250.79 m2

12 Pekerjaan Plesteran Dinding + Acian


Luas = 250.79 x 2.00 sisi
= 501.58 m2

13 Pekerjaan Acian Dinding


Luas = 250.79 x 2.00 sisi
= 501.58 m2

14 Pekerjaan Kusen Boven dan Daun Pintu Jendela

0.05 0.05 0.05


0.05
0.10 0.50 0.10 0.10 0.85 0.10 0.05
0.05
0.10 0.75 0.10

Pot. C - C Pot. B - B
Pot. B - B
Daun Pintu (P1) = 2.00 bh Luas = 0.12 M2
Daun Pintu (P2) = 1.00 bh Luas = 0.04 M2
Daun Pintu (P3) = 6.00 bh Luas = 0.22 M2 0.05 0.05 0.05 0.05
0.10 0.50 0.10 0.10 0.85 0.10 0.05
0.05

Daun Pintu (P4) = 3.00 bh Luas = 0.08 M2 Pot. B - B


0.10 0.75 0.10

Pot. C - C Pot. B - B
Daun Jendela (J1) = 2.00 bh Luas = 0.03 M2 D
0.05
A
0.05
A
0.10 0.05 0.05
0.10 0.10 0.50 0.10
0.10 0.85

Daun Jendela (J2) = 6.00 bh Luas = -


0.10 0.10

M2 0.05 0.05
0.05
0.10 0.75 0.10

B B
B
Kusen Pintu (P1) = 2.00 bh Luas = 0.06 M3 B

C C
1.20

Kusen Pintu (P2) = 1.00 bh Luas = 0.03 M3

cabening5mm
Kusen Pintu (P3) = 6.00 bh Luas = 0.15 M3

anilka
P
2.05
2.00 2.05
0.05 2.00

Kusen Pintu (P4) = 3.00 bh Luas = 0.07 M3


Pot. D - D
D
Kusen Jendela (J1) = 2.00 bh Luas = 0.04 M3
Kusen Jendela (J2) = 6.00 bh Luas = 0.15 M3
Jendela (J1) = 21 Bh
Bouven/Roster Pintu (P1) = - bh Luas = - M3 Skala 1 : 10 0
D 0.10 0.10 0.10 0.10

Bouven/Roster Pintu (P2) = - bh Luas = - M3 Pintu Type 1 = 3 Bh


A
Pot. A - A
A
Pot. A - A

D Pintu Type 2 = 5 Bh
Bouvent Kayu Klas I 5/10 = 54 Cm
Skala 1 : 20

Bouven/Batu Roster Pintu +Jendela = 35.00 bh Luas = 0.25 M3


Skala 1 : 20
D

Kisi - Kisi 1 = - bh Luas = - M2


Kisi - Kisi 2 = - bh Luas = - M2
Kisi - Kisi 3 = - bh Luas = - M2
Kisi - Kisi 4 = - bh Luas = - M2
LUAS TOTAL = 1.225 M2

15 Pekerjaan Atap
- Luas Atap
1 Luas Atap Ruangan (Type Pelana) 1 2.00
Panjang 1 = 8.00 m' Pjg 2 = 7.00
Kemiringan 1 = 5.45 m' Kemirngn 2 = 4.88
Luas = 8.00 x 5.45 Luas = 68.3
Luas Total Atap = 155.52 m2

Luas Atap Ruangan Aula 1/2 Pelana


Panjang = -
Kemiringan = -
Luas = - x -
= - m2
2 Luas Atap Ruangan Guru + WC/KM Konsol
Lebar = -
Kemiringan = -
Luas = - x -
= - m2

Luas Atap Ruangan Guru + WC/KM Biasa


Lebar = -
Kemiringan = -
Luas = - x -
= - m2

Luas Atap konsol pintu WC/KM


Lebar = -
Kemiringan = -
Luas = - x -
= - m2

3 Luas Atap Teras


Lebar = 5.00
Kemiringan = 3.00
Luas = 5.00 x 3.00
= 30.00 m2
TOTAL LUAS ATAP = 185.52 M2
Panjang Seng Plat Talang = 6.00
PANJANG SENG BUBUNGAN = 27.00

- Kuda - Kuda 6/12 Type 1


Jumlah kuda-kuda = 3.00
Uk. Balok = 0.06 / 0.12
Panjang Kaki kuda-kuda = 10.90
Panjang balok Tarik = 8.00
Ringbalk 15/20
Panjang Tiang Nok = 2.55
2
Panjang Tiang Nok Tempel = - Listplank 25
Panjang Balok Pengunci = 1.00
Panjang Balok Bubungan = 14.00 x 1Bh
Panjang balok Skoor = 4.00
Total Panjang Balok 6/12 = 26.45 x 3.00 = 93.4
Pjg Kaki kuda2 pd gewel = 32.70 Balok Tarik 6/12
= 126.05 m
Volume = 0.06 x 0.12 x 126.1
= 0.908 m3
Papan Jepit
Uk. Papan = 0.04 x 0.12
Panjang Papan Jepit Vertikal = 6.80
Panjang Papan Jepit Horisontal = 12.00
Total Panjang Balok 3/12 = 18.80 x 3.00
56.40
Volume = 56.40 / 4.00
= 14.10 Btg

Plat U Strip 4 - 60 cm = 3.00


Plat Strip 4 - 40 cm = 6.00
Beugel U Bulat 3 - 40 cm = 6.00
Mur Baut ø 3/8 - 10 cm = 18.00 ( Untuk Plat Strip )
Mur Baut ø 3/8 - 12 cm = 18.00 ( Untuk Papan Apit )
Mur Baut ø 5/8 - 25 cm = 12.00 ( Untuk Balok Pengunci )
Ring/Cinci Baut = 96.00
Angkur Penguat Kuda2 Ø 5/8 - 30 cm = - bh

- Kuda - Kuda 6/12 Gedung 2


Jumlah kuda-kuda = -
Uk. Balok = 0.06 / 0.12
Panjang Kaki kuda-kuda = 3.94
Panjang balok Tarik = 3.85
Panjang Tiang Nok = 0.95
Mur Baut
Total Panjang Balok 6/12 = 8.74 x -
Pjg Kaki kuda2 pd gewel = -
= 8.74 m
Volume = 0.06 x 0.12 x 8.74 - 0.05
Balok Tempel 6/12
= 0.063 m3
Talud Existing/Lama
TOTAL VOL. KUDA2 6/12 = 0.970 m3 34.72 Btg 33.70
TOTAL PJG KUDA2 6/12 = 134.79 m3 33.70 Btg

- Gording 6/10
Uk. Balok usuk = 0.06 / 0.10
Jumlah Gording =
Panjang 1 gording =
Panjang keseluruhan = 256.00
Ukuran balok = 0.06 x 0.10 x 256.0
Volume = 1.54 m3

Papan Jepit
Uk. Papan = 0.03 x 0.12
Panjang skoor Papan Jepit 3/12 = -

Total Panjang Balok 3/12 = - x -


-
Volume = - / 4.00
= - Btg

- Kait angin 6/10


Uk. Balok usuk = 0.06 / 0.10
Jumlah kait angin = -
Panjang 1 batang = -
Panjang keseluruhan = -
Ukuran balok = 0.06 x 0.10 x -
Volume = - m3

- Gording 6/10 Ruangan Aula


Uk. Balok usuk = 0.06 / 0.10
Jumlah Gording = -
Panjang 1 gording = -
Panjang keseluruhan = -
Ukuran balok = 0.06 x 0.10 x -
Volume = - m3

- Konsol 6/10 WC/KM


Uk. Balok usuk = 0.06 / 0.10
Panjang keseluruhan = m
Ukuran balok = 0.06 x 0.10 x -
Volume = - m3

- Gording 6/10 Teras


Jumlah Gording =
Panjang 1 gording =
Panjang keseluruhan = -
Ukuran balok = 0.06 x 0.10 x -
Volume = - m3
TOTAL VOL. GORDING 6/10 1.54 M3
TOTAL PJG GORDING 256.00 M'

Pekerjaan Listplank 2 Lapi2


Panjang Listplank Memanjang = 60.00 M1
Panjang Kemiringan Atap = 53.32
Total Panjang = 129.32 1.16
Volume = 32.33 Lbr

16 Pekerjaan rangka + Plafond


Luas Gedung Utama = 6.00 x 8.00 + 6.0 x 7.00
= 90.00 m2
Luas Teras = 2.00 x 3.00
= 6.00 m2
Luas Teritisan Depan = 11.00 x 1.00
= 11.00 m2
Luas Tirisan Belakang ruangan = 14.00 x 1.00
= 14.00 m2
Luas Aula = - x -
= - m2
= - x -
= - m2
Luas tirisan kr = 12.00 x 1.00
= 12.00 m2
Luas tirisan kn = 9.00 x 1.00
= 9.00 m2
Luas tirisan Teras = 11.00 x 1.00
= 11.00 m2
TOTAL = 153.00 m2

Pekerjaan List Plafond


Panjang List Plafond = 243.00 m
17 Pekerjaan Lantai dan Keramik
Pekerjaan Lantai dan Keramik
Luas (L) = 93.00 m2
Tinggi (T) = 0.05
Volume = L x T
= 93.00 x 0.05
= 4.65 m3

Pekerjaan Lantai keramik Ruangan utama 40x40 cm


Luas = 82.75 m2

Pekerjaan keramik dinding KM/WC (15X20)


Luas = - m2

Pekerjaan keramik dinding dan lantai bak KM/WC (15X20)


Luas = - m2

Pekerjaan keramik lantai KM/WC (15X20)


Luas = 10.250 m2

18 Pekerjaan Finishing
● Mengecat bidang Seng
Luas = 185.52 M2

● Mengecat bidang plafond


Luas = 153.00 M2

● Mengecat dinding
panjang = - m
tinggi = - m
- x
Luas = 501.58 M2
Luas pengecatan segi tiga ruangan
- x -
= - m2

Luas pengecatan segi tiga teras


= m
TOTAL = 501.58 M2
● Mengecat sepatu dinding
Panjang = 174.00 m
tinggi = 0.20 m
Luas = 34.80

● Pengecatan Listplank
panjang = 258.64 m
tinggi = 0.20 m
luas = 51.73 m2

● Pengecatan Listplafond
panjang = 243.00 m
tinggi = 0.05 m
luas = 12.15 m2

● Pengecatan Kosen
Pintu Type 1 1.00 bh
panjang 1 = 4.10 m Lebar Bidang Cat 1 = 0.3
panjang 2 = 1.50 m Lebar Bidang Cat 2 = 0.2
luas = 1.53 m2

Pintu Type 2 1.00 Bh


panjang 1 = 4.10 m Lebar Bidang Cat 1 = 0.3

panjang 2 = 1.00 m Lebar Bidang Cat 2 = 0.2


luas = 1.43 m2

Pintu Type 3 6.00 Bh


panjang 1 = 4.10 m Lebar Bidang Cat 1 = 0.3

panjang 2 = 0.98 m Lebar Bidang Cat 2 = 0.2


luas = 2.41 m2

Pintu Type 4 3.00 Bh


panjang 1 = 3.90 m Lebar Bidang Cat 1 = 0.3

panjang 2 = 0.78 m Lebar Bidang Cat 2 = 0.2


luas = 1.64 m2

Jendela Type 1 2.00 Bh


panjang 1 = 1.40 m Lebar Bidang Cat 1 = 0.6
panjang 2 = 1.20 m Lebar Bidang Cat 2 = 0.2
panjang 3 = - m
luas = 1.32 m2

Jendela Type 2 6.00 Bh


panjang 1 = 4.20 m Lebar Bidang Cat 1 = -
panjang 2 = 2.20 m Lebar Bidang Cat 2 = -
panjang 3 = - m
luas = - m2

Bouvent - Bh
panjang 1 = - m Lebar Bidang Cat 1 = 0.3
panjang 2 = - m Lebar Bidang Cat 2 = 0.2

luas = - m2

TOTAL 8.32 m2
19 Pekerjaan Lain - lain
Engsel pintu = 36.00 bh
Engsel Jendela = 28.00 bh
Engsel Bouvent = - bh ( Bouvent Pintu dan Jendela )
Kunci pintu tanam = 11.00 bh
Kait angin = 28.00 bh ( 1 jendela 2 kait Angin - Kiri + Kanan )
Grendel jendela = 14.00 bh ( Bouvent Pintu dan Jendela )
Grendel Pintu = 12.00 bh

20 Meubeler + Perlengkapan Lain


Meja 1/2 Biro = 2.00 Unit
Kursi Kayu = 8.00 Unit
Bangku Kayu = 2.00 Unit
Kursi Pelastik = Unit
Tempat Tidur = 2.00 Unit
Lemari Obat = 1.00 Unit ( 1,22 x 0,60 x 1,84 )
Lemari Arsip = 1.00 Unit ( 1,60 x 0,40 x 1,95 )

21 Perlengkapan Lain
Kasur = 2.00 Bh
Bantal Kepala = 4.00 Bh
BantaL Guling = 2.00 Bh
Seprei = 2.00 Bh
Sarung Bantal Kepala = 4.00 Bh
Sarung Bantal Guling = 2.00 Bh

22 Permainan
Permainan Luar = bh
Ayunan biasa = bh
Peluncur 2 arah = bh
Bola Dunia = bh
Jungkitan = bh

Permainan Dalam

Balok Mobil-mobilan = - set


Bongkar pasang truk = - set
Kebun binatang = - set
Rambu-rambu lalulintas = - set
Kereta angkah = - set
Kereta geometri = - set
Kereta abjad = - set
Menara angkah = - set
Menara huruf = - set
Meronce Kotak = - set
Meronce Huruf = - set
Meronce angkah = - set
Peraga Keluarga = - set
Puzel angkah = - set
Manik Hitung = - set
Papan 6 Alur = - set
Menara Jamur = - set
Ukuran tinggi badan = - set
Balok Kereta Api = - set
Menara Telur = - set
Alat Pertanian = - set
Komunikasi = - set

23 Pekerjaan Septiktank
Pekerjaan Galian
- Galian Lubang Pemecah kotoran
Panjang (P) = -
Lebar (L) = 0.55
Tinggi (T) = 0.75
Volume = P x L x t
= - 0.55 0.75
= -
- Galian Lubang Septiktank
Panjang (P) = 1.50
Lebar (L) = 1.50
Tinggi (T) = 1.50
Volume = P x L x t
= 1.50 1.50 1.50
= 3.38

- Galian Lubang Peresapan


Panjang (P) = 1.50
Lebar (L) = 1.50
Tinggi (T) = 1.50
Volume = P x L x t
= 1.50 1.50 1.50
= 3.38

TOTAL = 6.750

Pekerjaan pasangan dinding septiktank


Panjang = 1.50
Tinggi = 1.50
Luas = P x T
= 1.50 x 1.50
= 2.25
Pekerjaan pasangan dinding peresapan
Panjang = 1.50
Tinggi = 1.50
Luas = P x T
= 1.50 x 1.50
= 2.25

Pekerjaan Beton, Pembesian dan Bekisting


Coran beton penutup septiktank dan peresapan
Lebar (L) = 1.50 M
Tinggi (t) = 0.10 M
Panjang (n) = 1.50 M
Volume beton (v) = 1.50 x 0.10 x 1.50
= 0.23 x 2.00 ( Penutup Septi.,Penutup resapan,
= 0.45 m3 lantai septitank )
Coran beton penutup lubang pemecah kotoran
Lebar (L) = - M
Tinggi (t) = 0.10 M
Panjang (n) = 1.50 M
Volume beton (v) = - x 0.10 x 1.50
= - M3

Tulangan
Besi 10 mm
Melintang dan memanjang = 10.00
Pjg 1 staf melintang = 1.55
Pjg keseluruhan = 15.50 x 2.00 x 2.00
63.00 m
Kebutuhan besi 10 = 5.48 btg
Berat besi 10 = 40.56 kg KET.
D 10 = 7.4 kg/btg
D6 = 2.7 kg/btg
Instalasi Septiktank
Pipa PVC Ø 4'' = 2.00 btg
Knee PVC 4'' = 3.00 bh
Pipa PVC Ø 2'' = 2.00 btg
Knee PVC 2'' = 2.00 bh
Lem Paralon = 3.00 bh
Kloset Jongkok = 3.00 bh
Pipa Hawa = 1.00 bh

Pekerjaan Urugan Pasir, kerikil 2/3, batu 15/20 dan ijuk pd peresapan septiktank
Pasir
Luas (L) = 2.25
Tinggi (T) = 0.40
Volume = L x T
= 2.25 x 0.40
= 0.90

Kerikil 2/3
Luas (L) = 2.25
Tinggi (T) = 0.40
Volume = L x T
= 2.25 x 0.40
= 0.90

Batu 15/20
Luas (L) = 2.25
Tinggi (T) = 0.20
Volume = L x T
= 2.25 x 0.20
= 0.45

23 Pekerjaan Saluran Keliling

Galian La = 0.60
t = 0.70
p = - M'

vol = -

Pas. Batu 1 : 5
- Saluran
Panjang (P) = - M'

Luas I = 0.35 M2
Luas II = 0.12 M2

Luas = 0.23 M2

Volume = - M3

- Plester saluran = - M2
24 Pekerjaan instalasi listrik
Instalasi Listrik 900 watt = 1.00 ls Bonus Sekring Box dan instalisi ……… titik lampu
Neon (Philips) 18 Watt = 15.00 bh
Fiting Lampu = 15.00 bh
Saklar Ganda = 5.00 bh
Saklar Tunggal = 4.00 bh
Stop Kontak Lengkap = 8.00 bh
Embos = bh
Kabel Listrik NYM 2 x 1,5 mm = m'
ANALISA SATUAN BAHAN

Kebutuhan
Volume Satuan Analisa

Bahan Alat Pekerja Tukang

224.00 M2 Pekerjaan Pembersihan


0.1000 Org Pekerja 22.40

Bahan Alat Pekerja Tukang

50.00 M' 1 M' Pengukuran & pemasangan bouwplank


Bahan
0.0120 m3 Kayu Kaso 5 / 7 Klas II 0.60
0.0200 Kg Paku Biasa 5 1.00
0.0070 m3 Kayu Papan 3 / 20 Klas III 0.35
Tenaga
0.1000 HOK Tukang Kayu 5.00
0.1000 HOK Perkerja 5.00

Bahan Alat Pekerja Tukang


26.10 M3 1 M3 Galian Tanah biasa sedalam 1 meter
Tenaga
0.6250 HOK Pekerja 16.31

Bahan Alat Pekerja Tukang


8.70 M3 1 M3 Urugan tanah kembali
0.1920 HOK Pekerja 1.67

Bahan Alat Pekerja Tukang


2.18 M3 1 M3 Urugan Pasir alas pondasi dan lantai
1.1000 M3 Pasir urug anstamping 2.39
0.3000 Org Pekerja 0.65

Bahan Alat Pekerja Tukang


4.65 M3 1 M3 Urugan Pasir alas pondasi dan lantai
1.1000 M3 Pasir urug lantai 5.12
0.3000 Org Pekerja 1.40
Bahan Alat Pekerja Tukang
23.25 M3 1 M3 Urugan tanah peninggian lantai
1.1000 M3 Tanah urug lantai 25.58
0.3000 Org Pekerja 6.98

Bahan Alat Pekerja Tukang


4.35 M3 1 M3 Pasangan pondasi batu kosong
0.7800 M3 Pekerja 3.39
0.3900 Org Tukang 1.70
1.1000 Org Batu 15/20 4.79

Bahan Alat Pekerja Tukang


19.58 M3 1 M3 Pas. pondasi batu kali/karang 1PC : 6Psr
1.1000 M3 Batu Kali 21.53
0.5610 M3 Pasir Pasang 10.98
2.9250 Zak Semen 40 kg 57.26
0.6000 HOK Tukang Batu 11.75
1.5000 HOK Pekerja 29.36

Bahan Alat Pekerja Tukang


0.88 M3 1 M3 Membuat Kolom beton bertulang 1PC : 2Psr : 3Krl
8.0750 Zak Semen portland 7.14
0.5200 M3 Pasir beton 0.46
0.7800 M3 Kerikil 2/3 0.69
7.3000 org Pekerja 6.45
0.3500 org Tukang Batu 0.31
3.3000 org Tukang Kayu 2.92
2.1000 org Tukang Besi 0.31
Bahan Alat Pekerja Tukang
356.56 Kg Pembesian u/ kolom dgn besi polos atau ulir D 10 mm
1.0500 Kg Besi polos D 12 mm 35.13
3.0000 Kg Kawat beton 2.65
0.0000 0rg Pekerja -
0.0000 org Tukang -
Bahan Alat Pekerja Tukang
34.81 Kg Pembesian u/ Kolom dengan besi polos atau ulir D 6 mm
1.0500 Kg Besi polos D 6 mm 13.72
0.0000 Kg Kawat beton -
0.0000 0rg Pekerja -

0.0000 org Tukang -


Bahan Alat Pekerja Tukang
- 1 M3 bekisting untuk kolom
4.0000 Kg Paku biasa 7 cm 3.54
3.5000 Lbr Playwood 9 mm 3.09
20.000 Btg Kayu 5/7 Kelas II 17.68
0.0000 oh Pekerja -
0.0000 oh Tukang -
2.61 1 M3 Membuat Sloof beton bertulang 1PC : 2Psr : 3Krl
8.0750 Zak Semen portland 21.08
0.5200 M3 Pasir beton 1.36
0.7800 M3 Kerikil 2/3 2.04
4.8500 org Pekerja 12.66
0.3500 org Tukang Batu 0.91
1.5600 org Tukang Kayu 4.07
1.4000 org Tukang Besi 0.91

Bahan Alat Pekerja Tukang


322.46 Kg Pembesian u/ Sloof dgn besi polos atau ulir D 10 mm
1.0500 Kg Besi polos D 12 mm 31.77
3.0000 Kg Kawat beton 7.83
0.0000 0rg Pekerja -
0.0000 org Tukang -
Bahan Alat Pekerja Tukang
64.49 Kg Pembesian u/ Sloof dengan besi polos atau ulir D 6 mm
1.0500 Kg Besi polos D 6 mm 25.42
0.0000 Kg Kawat beton -
0.0000 0rg Pekerja -
0.0000 org Tukang -

Bahan Alat Pekerja Tukang


- 1 M2 Papan bekisting
2.0000 Kg Paku biasa 5.22
0.3700 m3 Papan 3/25 kls III u/ Begesting Sloof, Ringbalk & Latei 32.19
10.000 Btg Kayu 5/7 -

- 1 M3 Membuat Balok Latei beton bertulang 1PC : 2Psr : 3Krl Bahan Alat Pekerja Tukang
8.0750 Zak Semen portland -
0.5200 M3 Pasir beton -
0.7800 M3 Kerikil 2/3 -
5.9600 org Pekerja -
0.3500 org Tukang Batu -
2.8000 org Tukang Kayu -
1.4000 org Tukang Besi -

Bahan Alat Pekerja Tukang


- Kg Pembesian u/ Balok Latei dgn besi polos atau ulir D 10 mm
1.0500 Kg Besi polos D 12 mm -
3.0000 Kg Kawat beton -
0.0000 0rg Pekerja -
0.0000 org Tukang -
Bahan Alat Pekerja Tukang
- Kg Pembesian u/ Balok Latei dengan besi polos atau ulir D 6 mm
1.0500 Kg Besi polos D 6 mm -
0.0000 Kg Kawat beton -
0.0000 0rg Pekerja -
Bahan Alat Pekerja Tukang
1 M2 Papan bekisting untuk balok
2.000 Kg Paku biasa -
- 0.370 m3 Papan 2/20 kls III

2.61 M3 1 M3 Membuat Ringbalk beton bertulang 1PC : 2Psr : 3Krl Bahan Alat Pekerja Tukang
8.0750 Zak Semen portland 21.08
0.5200 M3 Pasir beton 1.36
0.7800 M3 Kerikil 2/3 2.04
4.8500 org Pekerja 12.66
0.3500 org Tukang Batu 0.91
1.5600 org Tukang Kayu 4.07
1.4000 org Tukang Besi 0.91

Bahan Alat Pekerja Tukang


322.46 Kg Pembesian u/ Ringbalk dgn besi polos atau ulir D 10 mm
1.0500 Kg Besi polos D 12 mm 31.77
3.0000 Kg Kawat beton 7.83
0.0000 0rg Pekerja -
0.0000 org Tukang -
Bahan Alat Pekerja Tukang
64.49 Kg Pembesian u/ Ringbalk dengan besi polos atau ulir D 6 mm
1.0500 Kg Besi polos D 6 mm 25.42
0.0000 Kg Kawat beton -
0.0000 0rg Pekerja -
0.0000 org Tukang -

Bahan Alat Pekerja Tukang


- 1 M2 Papan bekisting untuk Ringbalk
2.0000 Kg Paku biasa 5.22
0.3700 m3 Papan 2/20 kls III
10.000 Btg Kayu 5/7

0.71 M3 1 M3 Membuat Gewel beton bertulang 1PC : 2Psr : 3Krl Bahan Alat Pekerja Tukang
8.0750 Zak Semen portland 5.73
0.5200 M3 Pasir beton 0.37
0.7800 M3 Kerikil 2/3 0.55
4.8500 org Pekerja 3.44
0.3500 org Tukang Batu 0.25
1.5600 org Tukang Kayu 1.11
1.4000 org Tukang Besi 0.25

Bahan Alat Pekerja Tukang


116.98 Kg Pembesian u/ Gewel dgn besi polos atau ulir D 12 mm
1.0500 Kg Besi polos D 12 mm 11.53
3.0000 Kg Kawat beton 2.13
0.0000 0rg Pekerja -
0.0000 org Tukang -
Bahan Alat Pekerja Tukang
19.74 Kg Pembesian u/ Gewel dengan besi polos atau ulir D 6 mm
1.0500 Kg Besi polos D 6 mm 7.78
0.0000 Kg Kawat beton -
0.0000 0rg Pekerja -
0.0000 org Tukang -

Bahan Alat Pekerja Tukang


- 1 M2 Papan bekisting untuk Gewel
0.0000 Kg Paku biasa -
0.0000 m3 Papan 2/20 kls III -
0.0000 Btg Kayu 5/7 -

Bahan Alat Pekerja Tukang


-
-
-
-
-
-
-

Bahan Alat Pekerja Tukang


-
-
-
-
-
-
-

Bahan Alat Pekerja Tukang


250.79 M2 1 M2 Pas. bata merah tebal ½ bata, 1PC : 5Psr
70.000 Bh Batu Bata Merah 17,555
0.045 M3 Pasir Pasang 11.29
0.242 zak Semen 40 kg 60.69
0.100 Org Tukang 25.08
0.320 Org Pekerja 80.25

Bahan Alat Pekerja Tukang


501.58 M2 1 M2 Plesteran 1PC : 5Ps, tebal 15mm + Acian
0.108 zak Semen 40 kg 54.17
0.028 M3 Pasir pasang 14.04
0.153 Org Tukang 76.49
0.225 Org Pekerja 112.86
2
501.58 M2 1 M Acian 1PC : 5Ps, tebal 15mm Bahan Alat Pekerja Tukang
0.030 org Tukang 15.05
0.040 zak Semen 40 Kg 20.06
0.74 M3 1m³ Pasang Kusen Pintu dan Jendela Kayu Bayam
6.000 Org Pekerja 4.43

18.000 Org Tukang 13.30

0.15 M2 1m² Pasang Pintu Panel Kayu Jati


1.000 Org Pekerja 0.15

2.500 Org Tukang 0.39

0.03 M2 1m² Pasang Pintu dan Jendela Kaca Kayu Jati


0.80 Org Pekerja 0.02
2.00 Org Tukang 0.05

Bahan Alat Pekerja Tukang


185.52 M2 Mengatap dengan seng BJLS 0,30
0.8000 lbr Seng Gel. BJLS 0,30 148.42
0.0400 Kg Paku seng 7.42
0.0600 Org Tukang 11.13
0.1200 Org Pekerja 22.26
Bahan Alat Pekerja Tukang
27.00 M' 1M' Bubungan dan Talang Air seng plat 0,30
1.1000 m' Seng plat 0,30 29.70
0.0400 Kg Paku seng 1.08
0.1200 Org Tukang 3.24
0.0600 Org Pekerja 1.62

Bahan Alat Pekerja Tukang


0.97 M3 1M3 Kuda - kuda rangka atap kayu klas I
1.100 M3 Kayu Kuda2 6/12 klas I 1.00
0.800 Kg Paku 12 (Paku Putih) 0.78
0.800 kg Paku 10 biasa 0.78
- Btg Skoor Papan Gapit 3/12 14.10
- bh Plat U Strip 4 - 60 cm 3.00
- bh Plat Strip 4 - 20 cm 6.00
- bh Beugel U Bulat 3 - 60 cm 6.00
- bh Mur Baut ø 3/8 - 10 cm 18.00
- bh Mur Baut ø 3/8 - 12 cm 18.00
- bh Mur Baut ø 5/8 - 25 cm 12.00
- bh Ring/Cinci Baut 96.00
12.000 Org Tukang 11.65
4.000 Org Pekerja 3.88
Bahan Alat Pekerja Tukang
1.54 M3 1M3 Pekerjaan kayu gording
1.100 M3 Gording-kayu 5/10 klas II 1.69
10.000 Kg Paku 12 cm 15.36
14.000 Org Tukang kayu 21.50
4.000 Org Pekerja 6.14
Bahan Alat Pekerja Tukang

32.33 M' 1m' Pasang Lisplank 2 x( 2 x 25 )cm Kayu Klas I


1.1000 M3 Papan Listplank klas II 3/25/4 (2 Lapis) 35.56
0.1200 Kg Paku 7 cm 3.88
0.2500 Org Tukang kayu 8.08
0.1500 Org Pekerja 4.85

Bahan Alat Pekerja Tukang


153.00 M2 1 M2 Langit-langit plywood 3mm + rangka kayu kls II
0.0210 M3 Usuk kayu 5/7 klas II 3.21
0.2200 Kg Paku 7-10 Cm 33.66
0.2250 Org Tukang 34.43
0.1875 Org Pekerja 28.69
Bahan Alat Pekerja Tukang
153.00 M2 1 M2 Langit-langit plywood, tebal 3mm
0.3600 Lbr Plywood 3 mm 55.08
0.0350 Kg Paku tripleks 5.36
0.0700 Org Pekerja 10.71
0.1000 Org Tukang kayu 15.30
Bahan Alat Pekerja Tukang
243.00 M' 1 M' List langit-langit kayu profil
1.2000 m' List kayu profil pjg 4 m' 291.60
0.0150 Kg Paku 3 cm 3.65
0.0500 Org Pekerja 12.15
0.0500 Org Tukang kayu 12.15
Bahan Alat Pekerja Tukang

4.65 M3 3
1 M Membuat lantai beton, 1PC : 3Psr : 5Krl tebal 7cm
0.0260 M3 Batu pecah 2/3 0.12
0.5700 M3 Pasir Pasang 2.65
4.3250 Zak Semen 40 kg 20.11
0.2500 Org Tukang Batu 1.16
1.6500 Org Pekerja 7.67

Bahan Alat Pekerja Tukang


82.75 M2 1 M2 Pasang lantai keramik ukuran 40 x 40 cm
6.6300 Dos Keramik 40x40 cm 82.75
0.2040 Zak Semen 40 kg 16.88
0.9000 Kg Semen warna 2.86
0.0230 M3 Pasir pasang 1.90
0.2240 Org Tukang 18.54
0.6720 Org Pekerja 55.61

Bahan Alat Pekerja Tukang


- M2 1 M2 Pasang lantai & dinding Bak WC 20x20 cm
26.500 Bh Keramik 20x20 cm -
0.2190 Zak Semen 40 kg -
0.9000 Kg Semen warna -
0.0230 M3 Pasir pasang -
0.1300 Org Tukang -
0.2700 Org Pekerja -

Bahan Alat Pekerja Tukang


10.25 M2 1 M2 Pasang lantai keramik WC 20x20 cm
26.500 Bh Keramik lantai WC 20x20 cm 10.25
0.2190 Zak Semen 40 kg 2.24
0.9000 Kg Semen warna 9.23
0.0230 M3 Pasir pasang 0.24
0.1300 Org Tukang 1.33
0.2700 Org Pekerja 2.77

Bahan Alat Pekerja Tukang


185.52 M2 1M2 Mengecat seng (2 x jalan)
0.2250 Kg Cat seng (biru laut) @5 Kg 8.35
0.0650 Ltr Minyak Cat 12.06
0.0250 Bh Kuas biasa 4" 4.64
0.0090 Org Tukang cat 1.67
0.0700 Org Pekerja 12.99

Bahan Alat Pekerja Tukang


153.00 M2 1 M2 Pengecatan bidang Tripleks
(2 X jalan)
0.2600 Kg Cat plafond (Putih) @20 Kg 1.99
0.0150 Bh Kuas roll 2.30
0.0090 Org Tukang cat 1.38
0.0700 Org Pekerja 10.71

Bahan Alat Pekerja Tukang


501.58 M2 1M2 Mengecat tembok
(2 X jalan)
0.2600 Kg Cat dinding (kuning telur) @20 Kg 6.52
0.0150 Bh Kuas roll Besar dan Sedang 7.52
0.0090 Org Tukang cat 4.51
0.0700 Org Pekerja 35.11
Bahan Alat Pekerja Tukang

34.80 M2 1M2 Mengecat sepatu dinding (2 x Lapis)


0.2600 Kg Cat Kaki dinding (merah hati) @1 Kg 9.05
0.2500 Bh Kuas biasa 3" 8.70
0.0090 Org Tukang cat 0.31
0.0700 Org Pekerja 2.44

Bahan Alat Pekerja Tukang


51.73 M2 1M2 Mengecat listplank
(2 x jalan)
0.3500 Kg Cat listplank (Coklat Tua) @5kg 3.62
0.1700 Kg Cat Dasar 8.79
0.2000 Kg Meni 10.35
0.2000 Bh Kuas Biasa 3" 10.35
0.0090 Org Tukang cat 0.47
0.0700 Org Pekerja 3.62

Bahan Alat Pekerja Tukang


12.15 M2 1M2 Mengecat listplafond
(2 x jalan)
0.2600 Kg Cat listplafond (Coklat Tua) @1 Kg 3.16
0.0650 Ltr Minyak Cat 0.79
0.2000 Bh Kuas Biasa 2" 2.43
0.0090 Org Tukang cat 0.11
0.0700 Org Pekerja 0.85

Bahan Alat Pekerja Tukang

8.32 M2 1M2 Mengecat Kosen Pintu dan Jendela


(2 x jalan)
0.3500 Kg Cat Kayu (Coklat Tua) 2.91
0.1700 Kg Cat Dasar 1.42
0.2000 Kg Meni 1.66
0.2000 Bh Kuas Biasa 3" 1.66
1.1000 Lbr Kertas Amplas 9.16
0.0090 Org Tukang cat 0.07
0.0700 Org Pekerja 0.58

-
Bahan Alat Pekerja Tukang
6.75 M3 1 M3 Galian Tanah biasa sedalam 1 meter
0.6250 Pekerja 4.22
Bahan Alat Pekerja Tukang

4.50 M2 2
1 M Pasangan bata merah tebal ½ bata, 1PC : 5Psr
70.000 Bh Batu Bata Merah 315
0.045 M3 Pasir Pasang 0.20
0.242 zak Semen 40 kg 1.09
0.100 Org Tukang 0.45
0.320 Org Pekerja 1.44

Bahan Alat Pekerja Tukang


0.45 M3 1 M3 Membuat beton bertulang 1PC : 2Psr : 3Krl
8.075 Zak Semen portland 3.63
0.520 M3 Pasir beton 0.23
0.780 M3 Kerikil 2/3 0.35
4.850 org Pekerja 2.18
0.350 org Tukang Batu 0.16
1.560 org Tukang Kayu 0.70
1.400 org Tukang Besi 0.63

Bahan Alat Pekerja Tukang

40.56 Kg Pembesian dengan besi polos atau ulir D 10 mm


1.050 Kg Besi polos D 10 mm 5.75
3.000 Kg Kawat beton 1.35
-
-
Bahan Alat Pekerja Tukang
0.90 M3 1 M3 Urugan Pasir
1.2000 M3 Pasir urug lantai 1.08
0.3000 Org Tukang 0.27

0.90 M3 1 M3 Urugan kerikil


1.2000 M3 kerikil 1.08
0.3000 Org Tukang 0.27

0.45 M3 1 M3 Urugan batu 15/20


1.2000 M3 batu karang 0.54
0.3000 Org Tukang 0.14

Bahan Alat Pekerja Tukang

- M3 3
1 M Galian Tanah biasa sedalam 1 meter
0.7500 Org Pekerja -

- M3 1 M3 Pas. batu kali/karang 1PC : 5Psr


1.1000 M3 Batu Kali -
0.5610 M3 Pasir Pasang -
2.9250 Zak Semen 40 kg -
0.6000 HOK Tukang Batu -
1.5000 HOK Pekerja -

- M2 1 M2 Plesteran 1PC : 5Ps, tebal 15mm


0.108 zak Semen 40 kg -
0.028 M3 Pasir pasang -
0.153 Org Tukang -
0.225 Org Pekerja -
RENCANA ANGGARAN BIAYA (RAB)
...............................................................................
TAHUN ANGGARAN 2017

Propinsi : Nusa Tenggara Timur No. RAB 01


Kabupaten : Flores Timur Kegiatan Pengukuran
Kecamatan : ………………………. Volume
Desa : ……………………….

Volume Jumlah Total


No Uraian Sat. Harga Satuan
Total Swadaya Dana Desa Swadaya Dana Desa
a b c d e f g h i
I BAHAN
1 Kayu Kaso 5 / 7 Klas II 43.00 43.00 Btg 44,600.00 - 1,917,800.00
2 Paku Biasa 5 1.00 1.00 Kg 22,000.00 - 22,000.00
3 Kayu Papan 3 / 20 Klas III 15.00 15.00 Lbr 55,000.00 - 825,000.00

Sub Total I - 2,764,800.00

II ALAT
1 Benang Nilon 4.00 - 4.00 20,000.00 - 80,000.00
- - - - - -

Sub Total II - 80,000

III UPAH
1 Tukang 5.00 - 5.00 HOK 84,000.00 - 420,000.00
2 Pekerja 5.00 - 5.00 HOK 52,500.00 - 262,500.00

Sub Total III - 682,500.00

IV LAIN-LAIN
1 Papan Proyek 1.00 1.00 Ls 100,000.00 - 100,000.00
2 Prasasti 1.00 1.00 Bh 700,000.00 - 700,000.00

Sub Total IV - 800,000


Total Biaya ( I + II + III + IV ) - 4,327,300

Dari Dana Desa 4,327,300.00


Sumber Dana Dari Swadaya -
Jumlah Total (DD + Swadaya) 4,327,300.00

Mengetahui : Diperiksa Oleh : Dibuat Oleh :


Kepala Desa ............................... ....................................... Tim Pelaksana Kegiatan Desa

.............................................. ......................................... ...........................................


.............. KTD
RENCANA ANGGARAN BIAYA (RAB)
...............................................................................
TAHUN ANGGARAN 2017

Propinsi : Nusa Tenggara Timur No. RAB 02


Kabupaten : Flores Timur Kegiatan Galian Tanah
Kecamatan : ………………………. Volume
Desa : ……………………….

Volume Jumlah Total


No Uraian Sat. Harga Satuan
Total Swadaya Dana Desa Swadaya Dana Desa
a b c d e f g h i
I BAHAN

Sub Total I - -

II ALAT
1 Paquel 2.00 2.00 - 67,000.00 134,000.00 -
2 Cangkul 2.00 2.00 - 67,000.00 134,000.00 -
3 Linggis 2.00 2.00 - 67,000.00 134,000.00 -
4 Sekop 3.00 3.00 - 78,000.00 234,000.00 -

Sub Total II 636,000 -

III UPAH
1 Tukang - - HOK 84,000.00 - -
2 Pekerja 16.00 16.00 HOK 52,500.00 - 840,000.00

Sub Total III - 840,000.00

IV LAIN-LAIN

Sub Total IV - -
Total Biaya ( I + II + III + IV ) 636,000 840,000

Dari Dana Desa 840,000.00


Sumber Dana Dari Swadaya 636,000.00
Jumlah Total (DD + Swadaya) 1,476,000.00

Mengetahui : Diperiksa Oleh : Dibuat Oleh :


Kepala Desa ............................... ....................................... Tim Pelaksana Kegiatan Desa

.............................................. ......................................... ...........................................


.............. KTD
RENCANA ANGGARAN BIAYA (RAB)
...............................................................................
TAHUN ANGGARAN 2017

Propinsi : Nusa Tenggara Timur No. RAB 03


Kabupaten : Flores Timur Kegiatan Urugan
Kecamatan : ………………………. Volume
Desa : ……………………….

Volume Jumlah Total


No Uraian Sat. Harga Satuan
Total Swadaya Dana Desa Swadaya Dana Desa
a b c d e f g h i
I BAHAN
1 Pasir Urug 8.00 8.00 M3 229,000.00 - 1,832,000.00
2 Tanah Urug 26.00 26.00 M3 171,000.00 - 4,446,000.00

Sub Total I - 6,278,000.00

II ALAT
1 Sekop 2.00 - 2.00 Bh 78,000.00 - 156,000.00
2 Gerobak dorong 1.00 - 1.00 Bh 446,000.00 - 446,000.00

Sub Total II - 602,000

III UPAH
1 Tukang - - HOK 84,000.00 - -
2 Pekerja 9.00 9.00 HOK 52,500.00 - 472,500.00

Sub Total III - 472,500.00

IV LAIN-LAIN

Sub Total IV - -
Total Biaya ( I + II + III + IV ) - 7,352,500

Dari Dana Desa 7,352,500.00


Sumber Dana Dari Swadaya -
Jumlah Total (DD + Swadaya) 7,352,500.00

Mengetahui : Diperiksa Oleh : Dibuat Oleh :


Kepala Desa ............................... ....................................... Tim Pelaksana Kegiatan Desa

.............................................. ......................................... ...........................................


.............. KTD
RENCANA ANGGARAN BIAYA (RAB)
...............................................................................
TAHUN ANGGARAN 2017

Propinsi : Nusa Tenggara Timur No. RAB 04


Kabupaten : Flores Timur Kegiatan Pas. Batu
Kecamatan : ………………………. Volume
Desa : ……………………….

Volume Jumlah Total


No Uraian Sat. Harga Satuan
Total Swadaya Dana Desa Swadaya Dana Desa
a b c d e f g h i
I BAHAN
1 Batu Kali 22.00 22.00 M3 231,000.00 - 5,082,000.00
2 Pasir Pasang 11.00 11.00 M3 229,000.00 - 2,519,000.00
3 Semen 40 kg 57.00 57.00 Zak 66,000.00 - 3,762,000.00

Sub Total I - 11,363,000.00

II ALAT
1 Sekop 2.00 - 2.00 Bh 78,000.00 - 156,000.00
2 Ember Coor 5.00 - 5.00 Bh 17,000.00 - 85,000.00
3 Ember Campuran 5.00 - 5.00 Bh 28,000.00 - 140,000.00
4 Profil Tank 2200 Ltr 1.00 - 1.00 Bh 4,237,000.00 - 4,237,000.00
5 Terpal 4 x 6 1.00 - 1.00 Bh 201,000.00 - 201,000.00

Sub Total II - 4,819,000.00

III UPAH
1 Tukang 12.00 12.00 HOK 84,000.00 - 1,008,000.00
2 Pekerja 29.00 29.00 HOK 52,500.00 - 1,522,500.00

Sub Total III - 2,530,500.00

IV LAIN-LAIN

Sub Total IV - -
Total Biaya ( I + II + III + IV ) - 18,712,500

Dari Dana Desa 18,712,500.00


Sumber Dana Dari Swadaya -
Jumlah Total (DD + Swadaya) 18,712,500.00

Mengetahui : Diperiksa Oleh : Dibuat Oleh :


Kepala Desa ............................... ....................................... Tim Pelaksana Kegiatan Desa

.............................................. ......................................... ...........................................


.............. KTD
RENCANA ANGGARAN BIAYA (RAB)
...............................................................................
TAHUN ANGGARAN 2017

Propinsi : Nusa Tenggara Timur No. RAB 05


Kabupaten : Flores Timur Kegiatan Pek. Beton
Kecamatan : ………………………. Volume
Desa : ……………………….

Volume Jumlah Total


No Uraian Sat. Harga Satuan
Total Swadaya Dana Desa Swadaya Dana Desa
a b c d e f g h i
I BAHAN
1 Semen portland 55.00 - 55.00 Zak 66,000.00 - 3,630,000.00
2 Pasir beton 4.00 - 4.00 M3 229,000.00 - 916,000.00
3 Kerikil 2/3 5.00 - 5.00 M3 567,000.00 - 2,835,000.00
4 Besi polos D 12 mm 110.00 - 110.00 Staff 101,000.00 - 11,110,000.00
5 Besi polos D 6 mm 72.00 - 72.00 Staff 52,000.00 - 3,744,000.00
6 Kawat beton 20.00 - 20.00 Kg 28,000.00 - 560,000.00
7 Paku biasa 7 cm 14.00 - 14.00 Kg 22,000.00 - 308,000.00
8 Playwood 9 mm u/ Begesting Kolom 3.00 - 3.00 Lbr 134,000.00 - 402,000.00
9 Kayu 5/7 Kelas II 18.00 - 18.00 Btg 39,000.00 - 702,000.00
10 Kayu Papan 3 / 20 Klas III 32.00 - 32.00 Lbr 55,000.00 - 1,760,000.00

Sub Total I - 25,967,000.00

II ALAT
1 Sekop 2.00 - 2.00 78,000.00 - 156,000.00
2 Ember Coor 5.00 - 5.00 17,000.00 - 85,000.00

Sub Total II - 241,000

III UPAH
1 Tukang 17.00 17.00 HOK 84,000.00 - 1,428,000.00
2 Pekerja 35.00 35.00 HOK 52,500.00 - 1,837,500.00

Sub Total III - 3,265,500.00

IV LAIN-LAIN

Sub Total IV - -
Total Biaya ( I + II + III + IV ) - 29,473,500

Dari Dana Desa 29,473,500.00


Sumber Dana Dari Swadaya -
Jumlah Total (DD + Swadaya) 29,473,500.00

Mengetahui : Diperiksa Oleh : Dibuat Oleh :


Kepala Desa ............................... ....................................... Tim Pelaksana Kegiatan Desa

.............................................. ......................................... ...........................................


.............. KTD
RENCANA ANGGARAN BIAYA (RAB)
...............................................................................
TAHUN ANGGARAN 2017

Propinsi : Nusa Tenggara Timur No. RAB 06


Kabupaten : Flores Timur Kegiatan Pek. Dinding + Plester + Acian
Kecamatan : ………………………. Volume
Desa : ……………………….

Volume Jumlah Total


No Uraian Sat. Harga Satuan
Total Swadaya Dana Desa Swadaya Dana Desa
a b c d e f g h i
I BAHAN
1 Batu Bata Merah 17,555 17,555.00 Bh 1,000.00 - 17,555,000.00
2 Pasir Pasang 25.00 25.00 M3 229,000.00 - 5,725,000.00
3 Semen 40 kg 135.00 135.00 Zak 66,325.00 - 8,953,875.00

Sub Total I - 32,233,875.00

II ALAT
1 Kawat Ayak 4.00 4.00 M' 28,000.00 - 112,000.00

Sub Total II - 112,000

III UPAH
1 Tukang 102.00 102.00 HOK 84,000.00 - 8,568,000.00
2 Pekerja 193.00 193.00 HOK 52,500.00 - 10,132,500.00

Sub Total III - 18,700,500.00

IV LAIN-LAIN

Sub Total IV - -
Total Biaya ( I + II + III + IV ) - 51,046,375

Dari Dana Desa 51,046,375.00


Sumber Dana Dari Swadaya -
Jumlah Total (DD + Swadaya) 51,046,375.00

Mengetahui : Diperiksa Oleh : Dibuat Oleh :


Kepala Desa ............................... ....................................... Tim Pelaksana Kegiatan Desa

.............................................. ......................................... ...........................................


.............. KTD
RENCANA ANGGARAN BIAYA (RAB)
...............................................................................
TAHUN ANGGARAN 2017

Propinsi : Nusa Tenggara Timur No. RAB 07


Kabupaten : Flores Timur Kegiatan Pek. Pintu & Jendela
Kecamatan : ………………………. Volume
Desa : ……………………….

Volume Jumlah Total


No Uraian Sat. Harga Satuan
Total Swadaya Dana Desa Swadaya Dana Desa
a b c d e f g h i
I BAHAN
1 Daun Pintu (P1) 2.00 2.00 Bh 1,784,000.00 - 3,568,000.00
2 Daun Pintu (P2) 1.00 1.00 Bh 1,951,000.00 - 1,951,000.00
3 Daun Pintu (P3) 6.00 6.00 Bh 1,951,000.00 - 11,706,000.00
4 Daun Pintu (P4) 3.00 3.00 Bh 1,784,000.00 - 5,352,000.00
5 Daun Jendela (J1) 2.00 2.00 Bh 390,000.00 - 780,000.00
6 Daun Jendela (J2) 6.00 6.00 Bh 390,000.00 - 2,340,000.00
7 Kusen Pintu (P1) 2.00 2.00 Bh 500,000.00 - 1,000,000.00
8 Kusen Pintu (P2) 1.00 1.00 Bh 500,000.00 - 500,000.00
9 Kusen Pintu (P3) 6.00 6.00 Bh 500,000.00 - 3,000,000.00
10 Kusen Pintu (P4) 3.00 3.00 Bh 500,000.00 - 1,500,000.00
11 Kusen Jendela (J1) 2.00 2.00 Bh 279,000.00 - 558,000.00
12 Kusen Jendela (J2) 6.00 6.00 Bh 279,000.00 - 1,674,000.00
13 Bouven/Roster Pintu (P1) - - Bh 45,000.00 - -
14 Bouven/Roster Pintu (P2) - - Bh 45,000.00 - -
15 Bouven/Batu Roster Pintu +Jendela 35.00 35.00 Bh 22,000.00 - 770,000.00
16 Engsel pintu 36.00 36.00 Bh 33,000.00 - 1,188,000.00
17 Engsel Jendela 28.00 28.00 Bh 22,000.00 - 616,000.00
18 Engsel Bouvent - - Bh - - -
19 Kunci pintu tanam 11.00 11.00 Bh 134,000.00 - 1,474,000.00
20 Kait angin 28.00 28.00 Bh 17,000.00 - 476,000.00
21 Grendel jendela 14.00 14.00 Bh 17,000.00 - 238,000.00
22 Grendel Pintu 12.00 12.00 Bh 17,000.00 - 204,000.00

Sub Total I - 38,895,000.00

II ALAT

Sub Total II - -

III UPAH
1 Tukang 14.00 14.00 HOK 84,000.00 - 1,176,000.00
2 Pekerja 5.00 5.00 HOK 52,500.00 - 262,500.00

Sub Total III - 1,438,500.00

IV LAIN-LAIN

Sub Total IV - -
Total Biaya ( I + II + III + IV ) - 40,333,500

Dari Dana Desa 40,333,500.00


Sumber Dana Dari Swadaya -
Jumlah Total (DD + Swadaya) 40,333,500.00

Mengetahui : Diperiksa Oleh : Dibuat Oleh :


Kepala Desa ............................... ....................................... Tim Pelaksana Kegiatan Desa
.............................................. ......................................... ...........................................
.............. KTD
RENCANA ANGGARAN BIAYA (RAB)
...............................................................................
TAHUN ANGGARAN 2017

Propinsi : Nusa Tenggara Timur No. RAB 08


Kabupaten : Flores Timur Kegiatan Pek. Atap
Kecamatan : ………………………. Volume
Desa : ……………………….

Volume Jumlah Total


No Uraian Sat. Harga Satuan
Total Swadaya Dana Desa Swadaya Dana Desa
a b c d e f g h i
I BAHAN
1 Seng Gel. BJLS 0,30 149.00 - 149.00 Lbr 78,000.00 - 11,622,000.00
2 Paku seng 7.00 - 7.00 Kg 31,000.00 - 217,000.00
3 Seng plat Bubungan & Talang 0,30 30.00 - 30.00 M' 22,000.00 - 660,000.00
4 Kayu Kuda2 6/12 klas I 35.00 - 35.00 Btg/M3 329,000.00 - 11,515,000.00
5 Paku 12 (Paku Putih) 1.00 - 1.00 Kg 22,000.00 - 22,000.00
6 Paku 10 biasa 1.00 - 1.00 Kg 22,000.00 - 22,000.00
7 Skoor Papan Gapit 3/12 15.00 - 15.00 Lbr 167,000.00 - 2,505,000.00
8 Plat U Strip 4 - 60 cm 3.00 - 3.00 Bh 17,000.00 - 51,000.00
9 Plat Strip 4 - 20 cm 6.00 - 6.00 Bh 17,000.00 - 102,000.00
10 Beugel U Bulat 3 - 60 cm 6.00 - 6.00 Bh 17,000.00 - 102,000.00
11 Mur Baut ø 3/8 - 10 cm 18.00 - 18.00 Bh 11,000.00 - 198,000.00
12 Mur Baut ø 3/8 - 12 cm 18.00 - 18.00 Bh 11,000.00 - 198,000.00
13 Mur Baut ø 5/8 - 25 cm 12.00 - 12.00 Bh 11,000.00 - 132,000.00
14 Ring/Cinci Baut 96.00 - 96.00 Bh 1,000.00 - 96,000.00
15 Gording-kayu 5/10 klas II 85.00 - 85.00 Btg/M3 156,000.00 - 13,260,000.00
16 Paku 12 cm 15.00 - 15.00 Kg 22,000.00 - 330,000.00
17 Papan Listplank klas II 3/25/4 (2 Lapis) 36.00 - 36.00 Lbr 139,000.00 - 5,004,000.00
18 Paku 7 cm 4.00 - 4.00 Kg 22,000.00 - 88,000.00

Sub Total I - 46,124,000.00

II ALAT

Sub Total II - -

III UPAH
1 Tukang 34.00 34.00 HOK 84,000.00 - 2,856,000.00
2 Pekerja 39.00 39.00 HOK 52,500.00 - 2,047,500.00

Sub Total III - 4,903,500.00

IV LAIN-LAIN

Sub Total IV - -
Total Biaya ( I + II + III + IV ) - 51,027,500

Dari Dana Desa 51,027,500.00


Sumber Dana Dari Swadaya -
Jumlah Total (DD + Swadaya) 51,027,500.00

Mengetahui : Diperiksa Oleh : Dibuat Oleh :


Kepala Desa ............................... ....................................... Tim Pelaksana Kegiatan Desa

.............................................. ......................................... ...........................................


.............. KTD
RENCANA ANGGARAN BIAYA (RAB)
...............................................................................
TAHUN ANGGARAN 2017

Propinsi : Nusa Tenggara Timur No. RAB 09


Kabupaten : Flores Timur Kegiatan Pek. Lantai
Kecamatan : ………………………. Volume
Desa : ……………………….

Volume Jumlah Total


No Uraian Sat. Harga Satuan
Total Swadaya Dana Desa Swadaya Dana Desa
a b c d e f g h i
I BAHAN
1 Keramik 40x40 cm 83.00 83.00 Dos 106,000.00 - 8,798,000.00
2 Semen 40 kg 17.00 17.00 Zak 66,000.00 - 1,122,000.00
3 Semen warna 3.00 3.00 Kg 22,000.00 - 66,000.00
4 Pasir pasang 2.00 2.00 M3 229,000.00 - 458,000.00

Sub Total I - 10,444,000.00

II ALAT

Sub Total II - -

III UPAH
1 Tukang 19.00 19.00 HOK 84,000.00 - 1,596,000.00
2 Pekerja 56.00 56.00 HOK 52,500.00 - 2,940,000.00

Sub Total III - 4,536,000.00

IV LAIN-LAIN

Sub Total IV - -
Total Biaya ( I + II + III + IV ) - 14,980,000

Dari Dana Desa 14,980,000.00


Sumber Dana Dari Swadaya -
Jumlah Total (DD + Swadaya) 14,980,000.00

Mengetahui : Diperiksa Oleh : Dibuat Oleh :


Kepala Desa ............................... ....................................... Tim Pelaksana Kegiatan Desa

.............................................. ......................................... ...........................................


.............. KTD
RENCANA ANGGARAN BIAYA (RAB)
...............................................................................
TAHUN ANGGARAN 2017

Propinsi : Nusa Tenggara Timur No. RAB 10


Kabupaten : Flores Timur Kegiatan Pek. Plafond
Kecamatan : ………………………. Volume
Desa : ……………………….

Volume Jumlah Total


No Uraian Sat. Harga Satuan
Total Swadaya Dana Desa Swadaya Dana Desa
a b c d e f g h i
I BAHAN
1 Usuk kayu 5/7 klas II 3.00 - 3.00 M3 39,000.00 - 117,000.00
2 Paku 7-10 Cm 34.00 - 34.00 Kg 22,000.00 - 748,000.00
3 Plywood 3 mm 56.00 - 56.00 Lbr 106,000.00 - 5,936,000.00
4 Paku tripleks 5.00 - 5.00 Kg 28,000.00 - 140,000.00
5 List kayu profil pjg 4 m' 73.00 - 73.00 Lbr 11,000.00 - 803,000.00
6 Paku 3 cm 4.00 - 4.00 Kg 28,000.00 - 112,000.00

Sub Total I - 7,856,000.00

II ALAT

Sub Total II - -

III UPAH
1 Tukang 62.00 62.00 HOK 84,000.00 - 5,208,000.00
2 Pekerja 52.00 52.00 HOK 52,500.00 - 2,730,000.00

Sub Total III - 7,938,000.00

IV LAIN-LAIN

Sub Total IV - -
Total Biaya ( I + II + III + IV ) - 15,794,000

Dari Dana Desa 15,794,000.00


Sumber Dana Dari Swadaya -
Jumlah Total (DD + Swadaya) 15,794,000.00

Mengetahui : Diperiksa Oleh : Dibuat Oleh :


Kepala Desa ............................... ....................................... Tim Pelaksana Kegiatan Desa

.............................................. ......................................... ...........................................


.............. KTD
RENCANA ANGGARAN BIAYA (RAB)
...............................................................................
TAHUN ANGGARAN 2017

Propinsi : Nusa Tenggara Timur No. RAB 11


Kabupaten : Flores Timur Kegiatan Instalasi Listrik
Kecamatan : ………………………. Volume
Desa : ……………………….

Volume Jumlah Total


No Uraian Sat. Harga Satuan
Total Swadaya Dana Desa Swadaya Dana Desa
a b c d e f g h i
I BAHAN
1 Instalasi Listrik 900 watt 1.00 - 1.00 Ls 2,788,000.00 - 2,788,000.00
2 Neon (Philips) 18 Watt 15.00 - 15.00 Bh 78,000.00 - 1,170,000.00
3 Fiting Lampu 15.00 - 15.00 Bh 17,000.00 - 255,000.00
4 Saklar Ganda 5.00 - 5.00 Bh 22,000.00 110,000.00
5 Saklar Tunggal 4.00 - 4.00 Bh 17,000.00 68,000.00
6 Stop Kontak Lengkap 8.00 - 8.00 Bh 17,000.00 136,000.00
7 Embos - - - Bh -
8 Kabel Listrik NYM 2 x 1,5 mm - - - m -
-
-

Sub Total I - 4,527,000.00

II ALAT
- - -
- - -

Sub Total II - -

III UPAH
1 Tukang 9.00 9.00 Ls 84,000.00 - 756,000.00
2 Pekerja 11.00 11.00 Ls 52,500.00 - 577,500.00

Sub Total III - 1,333,500.00

IV LAIN-LAIN

Sub Total IV - -
Total Biaya ( I + II + III + IV ) - 5,860,500

Dari Dana Desa 5,860,500.00


Sumber Dana Dari Swadaya -
Jumlah Total (DD + Swadaya) 5,860,500.00

Mengetahui : Diperiksa Oleh : Dibuat Oleh :


Kepala Desa ............................... ....................................... Tim Pelaksana Kegiatan Desa

.............................................. ......................................... ...........................................


.............. KTD
RENCANA ANGGARAN BIAYA (RAB)
...............................................................................
TAHUN ANGGARAN 2017

Propinsi : Nusa Tenggara Timur No. RAB 12


Kabupaten : Flores Timur Kegiatan Pek. Pengacatan
Kecamatan : ………………………. Volume
Desa : ……………………….

Volume Jumlah Total


No Uraian Sat. Harga Satuan
Total Swadaya Dana Desa Swadaya Dana Desa
a b c d e f g h i
I BAHAN
1 Cat seng (biru laut) @5 Kg 9.00 - 9.00 Ember 67,000.00 - 603,000.00
2 Minyak Cat 13.00 - 13.00 Liter 28,000.00 - 364,000.00
3 Cat plafond (Putih) @20 Kg 2.00 - 2.00 Ember 134,000.00 - 268,000.00
4 Cat dinding (kuning telur) @20 Kg 7.00 - 7.00 Ember 134,000.00 - 938,000.00
5 Cat Kaki dinding (merah hati) @1 Kg 10.00 - 10.00 Kg 67,000.00 - 670,000.00
6 Cat listplank (Coklat Tua) @5kg 4.00 - 4.00 Kg 67,000.00 - 268,000.00
7 Cat Dasar 2.00 - 2.00 Kg 28,000.00 - 56,000.00
8 Cat listplafond (Coklat Tua) @1 Kg 4.00 - 4.00 Kg 67,000.00 - 268,000.00
9 Cat Kayu (Coklat Tua) 3.00 - 3.00 Kg 67,000.00 - 201,000.00

Sub Total I - 3,636,000.00

II ALAT
1 Kuas biasa 4" 5.00 - 5.00 Bh 17,000.00 - 85,000.00
2 Kuas roll Besar dan Sedang 3.00 - 3.00 Bh 39,000.00 - 117,000.00
3 Kuas biasa 3" 3.00 - 3.00 Bh 13,000.00 - 39,000.00
4 Kuas Biasa 2" 2.00 - 2.00 Bh 11,000.00 - 22,000.00
5 Kertas Amplas 10.00 - 10.00 Lbr 6,000.00 - 60,000.00

Sub Total II - 323,000

III UPAH
1 Tukang 9.00 9.00 HOK 84,000.00 - 756,000.00
2 Pekerja 66.00 66.00 HOK 52,500.00 - 3,465,000.00

Sub Total III - 4,221,000.00

IV LAIN-LAIN

Sub Total IV - -
Total Biaya ( I + II + III + IV ) - 8,180,000

Dari Dana Desa 8,180,000.00


Sumber Dana Dari Swadaya -
Jumlah Total (DD + Swadaya) 8,180,000.00

Mengetahui : Diperiksa Oleh : Dibuat Oleh :


Kepala Desa ............................... ....................................... Tim Pelaksana Kegiatan Desa

.............................................. ......................................... ...........................................


.............. KTD
RENCANA ANGGARAN BIAYA (RAB)
...............................................................................
TAHUN ANGGARAN 2017

Propinsi : Nusa Tenggara Timur No. RAB 13


Kabupaten : Flores Timur Kegiatan Pengadaan Mebeuler
Kecamatan : ………………………. Volume
Desa : ……………………….

Volume Jumlah Total


No Uraian Sat. Harga Satuan
Total Swadaya Dana Desa Swadaya Dana Desa
a b c d e f g h i
I BAHAN
1 Tempat Tidur 2.00 - 2.00 Bh 1,338,000.00 - 2,676,000.00
2 Lemari Arsip 1.00 - 1.00 Bh 836,000.00 - 836,000.00
3 Lemari Obat 1.00 - 1.00 Bh 836,000.00 - 836,000.00
4 Meja 1/2 Biro 2.00 - 2.00 Bh 1,394,000.00 - 2,788,000.00
5 Kursi Kayu 8.00 - 8.00 Bh 279,000.00 - 2,232,000.00
6 Bangku Kayu 2.00 - 2.00 Bh 335,000.00 - 670,000.00
7 Kursi Pelastik - - - Bh - -

Sub Total I - 10,038,000.00

II ALAT
1 - - -
2 - - -

Sub Total II - -

III UPAH
1 Tukang - - HOK - - -
2 Pekerja - - HOK - - -

Sub Total III - -

IV LAIN-LAIN

Sub Total IV - -
Total Biaya ( I + II + III + IV ) - 10,038,000

Dari Dana Desa 10,038,000.00


Sumber Dana Dari Swadaya -
Jumlah Total (DD + Swadaya) 10,038,000.00

Mengetahui : Diperiksa Oleh : Dibuat Oleh :


Kepala Desa ............................... ....................................... Tim Pelaksana Kegiatan Desa

.............................................. ......................................... ...........................................


.............. KTD
RENCANA ANGGARAN BIAYA (RAB)
...............................................................................
TAHUN ANGGARAN 2017

Propinsi : Nusa Tenggara Timur No. RAB 14


Kabupaten : Flores Timur Kegiatan Sanitasi
Kecamatan : ………………………. Volume
Desa : ……………………….

Volume Jumlah Total


No Uraian Sat. Harga Satuan
Total Swadaya Dana Desa Swadaya Dana Desa
a b c d e f g h i
I BAHAN
1 Kloset Jongkok 3.00 - 3.00 Bh 134,000.00 - 402,000.00
2 Floor Drain 3.00 - 3.00 Bh 6,000.00 - 18,000.00
3 Pipa PVC 4" 3.00 - 3.00 Btg 240,000.00 - 720,000.00
4 Pipa PVC 2" 2.00 - 2.00 Btg 134,000.00 - 268,000.00
5 Pipa Penguras 3.00 - 3.00 Bh 22,000.00 - 66,000.00
6 Pipa Hawa 1.00 - 1.00 Bh 28,000.00 - 28,000.00
7 Socket PVC 4" 3.00 - 3.00 Bh 11,000.00 - 33,000.00
8 Socket PVC 2" 3.00 - 3.00 Bh 11,000.00 - 33,000.00
9 Elbow PVC 4'' 3.00 - 3.00 Bh 22,000.00 - 66,000.00
10 Knee PVC 4" 3.00 - 3.00 Bh 22,000.00 - 66,000.00
11 Knee PVC 2" 2.00 - 2.00 Bh 22,000.00 - 44,000.00
12 Lem PVC 3.00 - 3.00 Bh 6,000.00 - 18,000.00

Sub Total I - 1,762,000.00

II ALAT

Sub Total II - -

III UPAH

Sub Total III - -

IV LAIN-LAIN

Sub Total IV - -
Total Biaya ( I + II + III + IV ) - 1,762,000

Dari Dana Desa 1,762,000.00


Sumber Dana Dari Swadaya -
Jumlah Total (DD + Swadaya) 1,762,000.00

Mengetahui : Diperiksa Oleh : Dibuat Oleh :


Kepala Desa ............................... ....................................... Tim Pelaksana Kegiatan Desa

.............................................. ......................................... ...........................................


.............. KTD
REKAPITULASI KEBUTUHAN BAHAN ALAT DAN UPAH
...............................................................................
TAHUN ANGGARAN 2017

Propinsi : Nusa Tenggara Timur


Kabupaten : Flores Timur
Kecamatan : ……………………….
Desa : ……………………….

Volume Jumlah Total


No Uraian Sat. Harga Satuan
Total Swadaya Dana Desa Swadaya Dana Desa
I UPAH
1 Tukang 283 - 283 HOK Rp 84,000 Rp - Rp 23,772,000
2 Pekerja 516 - 516 HOK Rp 52,500 Rp - Rp 27,090,000

SUB TOTAL I Rp - Rp 50,862,000###


II BAHAN
KAYU
1 Papan 3/20-4 kls III bowplank 15.00 - 15.00 Lbr Rp 55,000 Rp - Rp 825,000
2 Kayu 5/7-4 kls II 61.00 - 61.00 Btg Rp 44,600 Rp - Rp 2,720,600
3 Kayu Kuda2 6/12 klas II 35.00 - 35.00 Btg Rp 215,000 Rp - Rp 7,525,000
4 Papan jepit 4/12 15.00 - 15.00 Lbr Rp 139,000 Rp - Rp 2,085,000
5 Balok kayu 5/10 klas II 85.00 - 85.00 Btg Rp 156,000 Rp - Rp 13,260,000
6 Papan klas II 3/25/4 (listplank) 36.00 - 36.00 Lbr Rp 139,000 Rp - Rp 5,004,000
7 Usuk kayu 4/6 klas II (r. Plafond) 3.00 - 3.00 Btg Rp 39,000 Rp - Rp 117,000
8 List plafond kayu profil 73.00 - 73.00 m' Rp 11,000 Rp - Rp 803,000

PINTU JENDELA + BOVEN


1 Daun Pintu (P1) 2.00 - 2.00 Lbr Rp 1,784,000 Rp - Rp 3,568,000
2 Daun Pintu (P2) 1.00 - 1.00 Lbr Rp 1,951,000 Rp - Rp 1,951,000
3 Daun Pintu (P3) 6.00 - 6.00 Lbr Rp 1,951,000 Rp - Rp 11,706,000
4 Daun Pintu (P4) 3.00 - 3.00 Lbr Rp 1,784,000 Rp - Rp 5,352,000
5 Daun Jendela (J1) 2.00 - 2.00 Lbr Rp 390,000 Rp - Rp 780,000
6 Daun Jendela (J2) 6.00 - 6.00 Lbr Rp 390,000 Rp - Rp 2,340,000
7 Daun Bouven Pintu (P1) - - - Lbr Rp - Rp - Rp -
8 Daun Bouven Pintu (P2) - - - Lbr Rp - Rp - Rp -
9 Daun Bouven Jendela (J1 + J2) - - - Lbr Rp - Rp - Rp -
10 Ventilasi - - - Bh Rp - Rp - Rp -
11 Kisi - Kisi Type I - - - Bh Rp - Rp - Rp -
12 Kisi - Kisi Type II - - - Bh Rp - Rp - Rp -
13 Kisi - Kisi Type III - - - Bh Rp - Rp - Rp -
14 Kisi - Kisi Type IV - - - Bh Rp - Rp - Rp -
15 Kusen P1 2.00 - 2.00 Bh Rp 500,000 Rp - Rp 1,000,000
16 Kusen P2 1.00 - 1.00 Bh Rp 500,000 Rp - Rp 500,000
17 Kusen P3 6.00 - 6.00 Bh Rp 500,000 Rp - Rp 3,000,000
18 Kusen P4 3.00 - 3.00 Bh Rp 500,000 Rp - Rp 1,500,000
19 Kusen J1 + Bouvent - - - Bh Rp - Rp - Rp -
20 Kusen J2 + Bouvent - - - Bh Rp - Rp - Rp -
21 Bouvent Batu Roster 35.00 - 35.00 Bh Rp 22,000 Rp - Rp 770,000
22 Engsel pintu 36.00 - 36.00 Bh Rp 33,000 Rp - Rp 1,188,000
23 Engsel Jendela 28.00 - 28.00 Bh Rp 22,000 Rp - Rp 616,000
24 Engsel Bouvent - - - Bh Rp - Rp - Rp -
25 Kunci pintu tanam 11.00 - 11.00 Bh Rp 134,000 Rp - Rp 1,474,000
26 Kait angin 28.00 - 28.00 Bh Rp 17,000 Rp - Rp 476,000
27 Grendel jendela 14.00 - 14.00 Bh Rp 17,000 Rp - Rp 238,000
28 Grendel Pintu 12.00 - 12.00 Bh Rp 17,000 Rp - Rp 204,000

MEUBELER
1 Tempat Tidur 2.00 - 2.00 Bh Rp 1,338,000 Rp - Rp 2,676,000
2 Lemari Arsip 1.00 - 1.00 Bh Rp 836,000 Rp - Rp 836,000
3 Lemari Obat 1.00 - 1.00 Bh Rp 836,000 Rp - Rp 836,000
4 Meja 1/2 Biro 2.00 - 2.00 Bh Rp 1,394,000 Rp - Rp 2,788,000
5 Kursi Kayu 8.00 - 8.00 Bh Rp 279,000 Rp - Rp 2,232,000
6 Bangku Kayu 2.00 - 2.00 Bh Rp 335,000 Rp - Rp 670,000
7 Kursi Pelastik - - - Bh Rp - Rp - Rp -
BAHAN/MATERIAL LOKAL
1 Pasir pasang 42.00 - 42.00 M3 Rp 229,000 Rp - Rp 9,618,000###
2 Pasir urug 8.00 - 8.00 M3 Rp 229,000 Rp - Rp 1,832,000###
3 Tanah urug 26.00 - 26.00 M3 Rp 171,000 Rp - Rp 4,446,000###
4 Batu Pasang 22.00 - 22.00 M3 Rp 231,000 Rp - Rp 5,082,000###
5 Kerikil uk. 2/3 5.00 - 5.00 M3 Rp 567,000 Rp - Rp 2,835,000###
6 Batu Bata 17,555.00 - 17,555.00 Bh Rp 1,000 Rp - Rp 17,555,000
7 Air Kerja 3.00 - 3.00 Tengki Rp 350,000 Rp - Rp 1,050,000

BAHAN/MATERIAL NON LOKAL


1 Semen 40 kg Bozowa 264.00 - 264.00 Zak Rp 66,000 Rp - Rp 17,424,000 ###
2 Besi polos D 12 mm 110.00 - 110.00 Staff Rp 101,000 Rp - Rp 11,110,000 ###
3 Kawat beton 20.00 - 20.00 Kg Rp 28,000 Rp - Rp 560,000 ###
4 Besi polos D 6 mm 72.00 - 72.00 Staff Rp 52,000 Rp - Rp 3,744,000 ###
5 Seng Gel. BJLS 0,30 149.00 - 149.00 Lbr Rp 78,000 Rp - Rp 11,622,000 ###
6 Paku seng 7.00 - 7.00 Kg Rp 31,000 Rp - Rp 217,000 ###
7 Seng plat 0,30 30.00 - 30.00 M Rp 22,000 Rp - Rp 660,000 ###
8 Paku 12 (Paku Putih) 1.00 - 1.00 Kg Rp 22,000 Rp - Rp 22,000 ###
9 Paku 12 biasa 15.00 - 15.00 Kg Rp 22,000 Rp - Rp 330,000
10 Paku 10 biasa 1.00 - 1.00 Kg Rp 22,000 Rp - Rp 22,000 ###
11 Paku 7-10 Cm 34.00 - 34.00 Kg Rp 22,000 Rp - Rp 748,000
12 Plat U Strip 4 - 60 cm 3.00 - 3.00 Bh Rp 17,000 Rp - Rp 51,000 ###
13 Plat Strip 4 - 20 cm 6.00 - 6.00 Bh Rp 17,000 Rp - Rp 102,000 ###
14 Beugel U bulat 3 - 60 cm 6.00 - 6.00 Bh Rp 17,000 Rp - Rp 102,000 ###
15 Mor Baut ø 3/8 - 10 cm 18.00 - 18.00 Bh Rp 11,000 Rp - Rp 198,000
16 Mor Baut ø 3/8 - 12 cm 18.00 - 18.00 Bh Rp 11,000 Rp - Rp 198,000 ###
17 Mor Baut ø 3/8 - 25 cm 12.00 - 12.00 Bh Rp 11,000 Rp - Rp 132,000 ###
18 Ring/Cinci Baut 96.00 - 96.00 Bh Rp 1,000 Rp - Rp 96,000 ###
19 Paku 7 cm 18.00 - 18.00 Kg Rp 22,000 Rp - Rp 396,000 ###
20 Keramik 40x40 cm 83.00 - 83.00 Dos Rp 106,000 Rp - Rp 8,798,000 ###
21 Semen warna 3.00 - 3.00 Kg Rp 22,000 Rp - Rp 66,000 ###
22 Keramik 15x20 cm - - - Dos Rp - Rp - Rp - ###
23 Keramik lantai WC 15x20 cm - - - Dos Rp - Rp - Rp - ###
24 Plywood 3 mm 56.00 - 56.00 Lbr Rp 106,000 Rp - Rp 5,936,000 ###
25 Playwood 9 mm u/ Begesting Kolom 3.00 - 3.00 Lbr Rp 134,000 Rp - Rp 402,000
26 Paku tripleks 5.00 - 5.00 Kg Rp 28,000 Rp - Rp 140,000 ###
27 Cat seng (biru laut) @5 Kg 9.00 - 9.00 Ember Rp 67,000 Rp - Rp 603,000 ###
28 Cat plafond (Putih) @20 Kg 2.00 - 2.00 Ember Rp 134,000 Rp - Rp 268,000 ###
29 Cat dinding (kuning telur) @20 Kg 7.00 - 7.00 Ember Rp 134,000 Rp - Rp 938,000 ###
30 Cat listplank (Coklat Tua) @5kg 4.00 - 4.00 Kg Rp 67,000 Rp - Rp 268,000 ###
31 Cat listplafond (Coklat Tua) @1 Kg 4.00 - 4.00 Kg Rp 67,000 Rp - Rp 268,000
32 Cat Kayu (Coklat Tua) 3.00 - 3.00 Kg Rp 67,000 Rp - Rp 201,000
33 Cat Kaki dinding (merah hati) @1 Kg 10.00 - 10.00 Kg Rp 67,000 Rp - Rp 670,000
34 Cat Dasar 2.00 - 2.00 Kg Rp 28,000 Rp - Rp 56,000
35 Minyak Cat 13.00 - 13.00 Ltr Rp 28,000 Rp - Rp 364,000
36 Pipa PVC Ø 4'' 3.00 - 3.00 Btg Rp 240,000 Rp - Rp 720,000 ###
37 Knee PVC 4'' 135° 3.00 - 3.00 Bh Rp 22,000 Rp - Rp 66,000 ###
38 Elbow PVC 4'' 3.00 - 3.00 Bh Rp 22,000 Rp - Rp 66,000
39 Pipa PVC Ø 2'' 2.00 - 2.00 Btg Rp 134,000 Rp - Rp 268,000 ###
40 Knee PVC 2'' 135° 2.00 - 2.00 Bh Rp 22,000 Rp - Rp 44,000 ###
41 Lem Paralon 3.00 - 3.00 Bh Rp 6,000 Rp - Rp 18,000 ###
42 Socket PVC Ø 4" 3.00 - 3.00 Bh Rp 11,000 Rp - Rp 33,000 ###
43 Socket PVC Ø 2" 3.00 - 3.00 Bh Rp 11,000 Rp - Rp 33,000 ###
44 Pipa Penguras 3.00 - 3.00 Bh Rp 22,000 Rp - Rp 66,000
45 Pipa Hawa 1.00 - 1.00 Bh Rp 28,000 Rp - Rp 28,000
46 Kloset Jongkok 3.00 - 3.00 Bh Rp 134,000 Rp - Rp 402,000 ###
47 Floor Drain 3.00 - 3.00 Bh Rp 6,000 Rp - Rp 18,000 ###

INSTALASI LISTRIK
1 Instalasi Listrik 900 watt 1.00 - 1.00 Ls Rp 2,788,000 Rp - Rp 2,788,000
2 Neon (Philips) 18 Watt 15.00 - 15.00 Bh Rp 78,000 Rp - Rp 1,170,000
3 Fiting Lampu 15.00 - 15.00 Bh Rp 17,000 Rp - Rp 255,000
4 Saklar Ganda 5.00 - 5.00 Bh Rp 22,000 Rp - Rp 110,000
5 Saklar Tunggal 4.00 - 4.00 Bh Rp 17,000 Rp - Rp 68,000
6 Stop Kontak Lengkap 8.00 - 8.00 Bh Rp 17,000 Rp - Rp 136,000
7 Embos - - - Bh Rp - Rp - Rp -
8 Kabel Listrik NYM 2 x 1,5 mm - - - Bh Rp - Rp - Rp -

SUB TOTAL II Rp - Rp 194,459,600


III PERALATAN
1 Linggis 2.00 2.00 - Bh Rp - Rp - Rp -
2 Cangkul 2.00 2.00 - Bh Rp 67,000 Rp 134,000 Rp -
3 Paquel 2.00 2.00 - Bh Rp 67,000 Rp 134,000 Rp -
4 Sekop 9.00 3.00 6.00 Bh Rp 78,000 Rp 234,000 Rp 468,000
5 Ember Coor 5.00 - 5.00 Bh Rp 17,000 Rp - Rp 85,000###
6 Ember Campuran 5.00 - 5.00 Bh Rp 28,000 Rp - Rp 140,000
7 Profil Tank 2200 Ltr 1.00 - 1.00 Bh Rp 4,237,000 Rp - Rp 4,237,000
8 Kuas biasa 4'' 5.00 - 5.00 Bh Rp 17,000 Rp - Rp 85,000
9 Kuas biasa 3'' 3.00 - 3.00 Bh Rp 13,000 Rp - Rp 39,000
10 Kuas biasa 2'' 2.00 - 2.00 Bh Rp 11,000 Rp - Rp 22,000
11 Kuas roll 3.00 - 3.00 Bh Rp 39,000 Rp - Rp 117,000
12 Terpal 4 x 6 1.00 - 1.00 Bh Rp 201,000 Rp - Rp 201,000
13 Benang Nilon 4.00 - 4.00 Roll Rp 20,000 Rp - Rp 80,000
14 Kawat Ayak 4.00 - 4.00 m Rp 28,000 Rp - Rp 112,000
15 Gerobak Dorong 1.00 - 1.00 Bh Rp 446,000 Rp - Rp 446,000

SUB TOTAL III Rp 502,000 Rp 6,032,000


IV LAIN - LAIN

1 Papan Nama Proyek 1.00 - 1.00 Ls Rp 100,000 Rp - Rp 100,000


2 Prasasti 1.00 - 1.00 Bh Rp 700,000 Rp - Rp 700,000

SUB TOTAL IV Rp - Rp ###


800,000
JUMLAH SUB TOTAL I s/d IV Rp 502,000 Rp 252,153,600
OPS TIM PERENCANA ###
GRAND TOTAL Rp 252,153,600 ###
###

###
Mengetahui : Diperiksa Oleh : Dibuat Oleh :
Kepala Desa ............................... ....................................... Tim Pelaksana Kegiatan Desa

.............................................. ......................................... ...........................................


.............. KTD
REKAPITULASI RENCANA ANGGARAN BIAYA
...............................................................................
TAHUN ANGGARAN 2017

Propinsi : Nusa Tenggara Timur


Kabupaten : Flores Timur
Kecamatan : ……………………….
Desa : ……………………….

N0 URAIAN SWADAYA DANA DESA Bobot (%)

I BAHAN - 194,459,600 76.97%

II ALAT 502,000 6,032,000 2.59%

III UPAH - 50,862,000 20.13%

IV LAIN - LAIN - 800,000 0.32%

TOTAL 502,000.00 252,153,600.00 100.00%

Operasional Tim Perencana - 0.00%

GRAND TOTAL 502,000.00 252,153,600.00 100.00%

Mengetahui : Diperiksa Oleh : Dibuat Oleh :


Kepala Desa ............................... ....................................... Tim Pelaksana Kegiatan Desa

.............................................. ......................................... ...........................................


.............. KTD
CV/UD/Perorangan :
ALAMAT :
STATUS : ……………………………2014

SPESIFIKASI
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL JENIS MM SAT DIAMETER LUAR KE LOKASI KETERANGAN
Tebal Brt tanpa Ulir
Max (mm) Min (mm) Min Kg / Btg (Rp) (Rp)

1 Pipa GIP Ø4 100 Btg 113.90 113.00 67.00


Pipa GIP Ø3 MEDIUM A 80 Btg 88.70 87.90 45.00
Pipa GIP Ø 2 1/2 ( ISTW ) 65 Btg 76.00 75.20 3.70 36.00
Pipa GIP Ø2 50 Btg 60.20 59.60 3.60 25.00
Pipa GIP Ø 1 1/2 40 Btg 48.20 47.80 3.30 18.00
Pipa GIP Ø1 25 Btg 33.80 33.20 3.20 12.00
Pipa GIP Ø 3/4 20 Btg 26.90 26.40 2.60 7.50
Pipa GIP Ø 1/2 15 Btg 21.40 21.00 2.60 5.00

2 Pipa GIP Ø3 MEDIUM B Btg


Pipa GIP Ø 2 1/2 ( ISTW ) Btg
Pipa GIP Ø2 Btg 2.70
Pipa GIP Ø 1 1/2 Btg 2.20
Pipa GIP Ø1 Btg 2.10
Pipa GIP Ø 3/4 Btg 2.10
Pipa GIP Ø 1/2 Btg 2.10

3 Pipa GIP Ø3 MEDIUM A Btg


Pipa GIP Ø 2 1/2 ( SPINDO ) Btg
Pipa GIP Ø2 Btg
Pipa GIP Ø 1 1/2 Btg
Pipa GIP Ø1 Btg
Pipa GIP Ø 3/4 Btg
Pipa GIP Ø 1/2 Btg
SPESIFIKASI
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL JENIS MM SAT DIAMETER LUAR KE LOKASI KETERANGAN
Tebal Brt tanpa Ulir
Max (mm) Min (mm) Min Kg / Btg (Rp) (Rp)
4 Pipa GIP Ø3 MEDIUM B Btg
Pipa GIP Ø 2 1/2 ( SPINDO ) Btg
Pipa GIP Ø2 Btg
Pipa GIP Ø 1 1/2 Btg
Pipa GIP Ø1 Btg
Pipa GIP Ø 3/4 Btg
Pipa GIP Ø 1/2 Btg

5 Pipa GIP Ø3 MEDIUM A Btg


Pipa GIP Ø 2 1/2 (BSA SUPER TEBAL) Btg
Pipa GIP Ø2 Btg
Pipa GIP Ø 1 1/2 Btg
Pipa GIP Ø1 Btg
Pipa GIP Ø 3/4 Btg
Pipa GIP Ø 1/2 Btg

6 Pipa GIP Ø3 MEDIUM B Btg


Pipa GIP Ø 2 1/2 (BSA SUPER TEBAL) Btg
Pipa GIP Ø2 Btg
Pipa GIP Ø 1 1/2 Btg
Pipa GIP Ø1 Btg
Pipa GIP Ø 3/4 Btg
Pipa GIP Ø 1/2 Btg

7 Socket Lurus Ø3 Bh
Socket Lurus Ø 2 1/2 Bh
Socket Lurus Ø2 Bh
Socket Lurus Ø 1 1/2 Bh
Socket Lurus Ø1 Bh
Socket Lurus Ø 3/4 Bh
Socket Lurus Ø 1/2 Bh
SPESIFIKASI
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL JENIS MM SAT DIAMETER LUAR KE LOKASI KETERANGAN
Tebal Brt tanpa Ulir
Max (mm) Min (mm) Min Kg / Btg (Rp) (Rp)
8 Socket bok /Knee 90 Ø3 Bh
Socket bok /Knee 90 Ø 2 1/2 Bh
Socket bok /Knee 90 Ø2 Bh
Socket bok /Knee 90 Ø 1 1/2 Bh
Socket bok /Knee 90 Ø1 Bh
Socket bok /Knee 90 Ø 3/4 Bh
Socket bok /Knee 90 Ø 1/2 Bh

9 Socket bok /Knee 135 Ø3 Bh


Socket bok /Knee 135 Ø 2 1/2 Bh
Socket bok /Knee 135 Ø2 Bh
Socket bok /Knee 135 Ø 1 1/2 Bh
Socket bok /Knee 135 Ø1 Bh
Socket bok /Knee 135 Ø 3/4 Bh
Socket bok /Knee 135 Ø 1/2 Bh

10 Socket Tee Ø3 Bh
Socket Tee Ø 2 1/2 Bh
Socket Tee Ø2 Bh
Socket Tee Ø 1 1/2 Bh
Socket Tee Ø1 Bh
Socket Tee Ø 3/4 Bh
Socket Tee Ø 1/2 Bh

11 Elbow Ø3 Bh
Elbow Ø 2 1/2 Bh
Elbow Ø2 Bh
Elbow Ø 1 1/2 Bh
Elbow Ø1 Bh
Elbow Ø 3/4 Bh
Elbow Ø 1/2 Bh
SPESIFIKASI
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL JENIS MM SAT DIAMETER LUAR KE LOKASI KETERANGAN
Tebal Brt tanpa Ulir
Max (mm) Min (mm) Min Kg / Btg (Rp) (Rp)
12 Over loop Ø 3 - 2 1/2 Bh
Over loop Ø3-2 Bh
Over loop Ø 3 - 1 1/2 Bh
Over loop Ø3-1 Bh
Over loop Ø 2 1/2 - 2 Bh
Over loop Ø 2 1/2 - 1 1/2 Bh
Over loop Ø 2 1/2 - 1 Bh
Over loop Ø 2 1/2 - 3/4 Bh
Over loop Ø 2 1/2 - 1/2 Bh
Over loop Ø 2 - 1 1/2 Bh
Over loop Ø2 - 1 Bh
Over loop Ø 2 - 3/4 Bh
Over loop Ø 2 - 1/2 Bh
Over loop Ø 1 1/2 - 1 Bh
Over loop Ø 1 1/2 - 3/4 Bh
Over loop Ø 1 1/2 - 1/2 Bh
Over loop Ø 1 - 3/4 Bh
Over loop Ø 1 - 1/2 Bh
Over loop Ø 3/4 - 1/2 Bh

13 Over Tee Ø 3 - 2 1/2 Bh


Over Tee Ø3-2 Bh
Over Tee Ø 3 - 1 1/2 Bh
Over Tee Ø3-1 Bh
Over Tee Ø 3 - 3/4 Bh
Over Tee Ø 3 - 1/2 Bh
Over Tee Ø 2 1/2 - 2 Bh
Over Tee Ø 2 - 1 1/2 Bh
Over Tee Ø 2 1/2 - 1 Bh
Over Tee Ø 2 1/2 - 3/4 Bh
Over Tee Ø 2 1/2 - 1/2 Bh
Over Tee Ø 2 - 1 1/2 Bh
Over Tee Ø2 - 1 Bh
Over Tee Ø 2 - 3/4 Bh
Over Tee Ø 2 - 1/2 Bh
Over Tee Ø 1 1/2 - 1 Bh
Over Tee Ø 1 1/2 - 3/4 Bh
Over Tee Ø 1 1/2 - 1/2 Bh
Over Tee Ø 1 - 3/4 Bh
Over Tee Ø 1 - 1/2 Bh
Over Tee Ø 3/4 - 1/2 Bh
SPESIFIKASI
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL JENIS MM SAT DIAMETER LUAR KE LOKASI KETERANGAN
Tebal Brt tanpa Ulir
Max (mm) Min (mm) Min Kg / Btg (Rp) (Rp)
14 Water moor Ø3 Merek Onda Bh
Water moor Ø 2 1/2 Merek Onda Bh
Water moor Ø2 Merek Onda Bh
Water moor Ø 1 1/2 Merek Onda Bh
Water moor Ø1 Merek Onda Bh
Water moor Ø 3/4 Merek Onda Bh
Water moor Ø 1/2 Merek Onda Bh

15 Doble Nippel Ø3
Doble Nippel Ø 2 1/2 Bh
Doble Nippel Ø2 Bh
Doble Nippel Ø 1 1/2 Bh
Doble Nippel Ø1 Bh
Doble Nippel Ø 3/4 Bh
Doble Nippel Ø 1/2 Bh

16 Plug Kran Ø3 Merek Onda Bh


Plug Kran Ø 2 1/2 Merek Onda Bh
Plug Kran Ø2 Merek Onda Bh
Plug Kran Ø 1 1/2 Merek Onda Bh
Plug Kran Ø1 Merek Onda Bh
Plug Kran Ø 3/4 Merek Onda Bh
Plug Kran Ø 1/2 Merek Onda Bh

17 Balvalve Ø3 Merek Onda Bh


Balvalve Ø 2 1/2 Merek Onda Bh
Balvalve Ø2 Merek Onda Bh
Balvalve Ø 1 1/2 Merek Onda Bh
Balvalve Ø1 Merek Onda Bh
Balvalve Ø 3/4 Merek Onda Bh
Balvalve Ø 1/2 Merek Onda Bh

18 Dop Ø 2 1/2 Bh
Dop Ø2 Bh
Dop Ø 1 1/2 Bh
Dop Ø1 Bh
Dop Ø 3/4 Bh
Dop Ø 1/2 Bh
SPESIFIKASI
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL JENIS MM SAT DIAMETER LUAR KE LOKASI KETERANGAN
Tebal Brt tanpa Ulir
Max (mm) Min (mm) Min Kg / Btg (Rp) (Rp)
19 Stop Kran Ø3 Merek Onda Bh
Stop Kran Ø 2 1/2 Merek Onda Bh
Stop Kran Ø2 Merek Onda Bh
Stop Kran Ø 1 1/2 Merek Onda Bh
Stop Kran Ø1 Merek Onda Bh
Stop Kran Ø 3/4 Merek Onda Bh
Stop Kran Ø 1/2 Merek Onda Bh

20 Kran Air Ø 1/2 Merek Onda Bh


Kran Air Ø 3/4 Merek Onda Bh

22 Pipa Penguras Ø 1 1/2 Bh


Pipa Peluap Ø 1 1/2 Bh
Pipa Hawa Ø1 Bh
Pipa Saring Ø 2 1/2 Bh
Pipa Saring Ø2 Bh
Pipa Saring Ø 1 1/2 Bh

SPESIFIKASI
ONGKOS ANGKUT
HARGA SATUAN
NO NAMA BAHAN/MATERIAL JENIS MM SAT DIAMETER LUAR KE LOKASI KETERANGAN
Tebal Brt tanpa Ulir
Max (mm) Min (mm) Min Kg / Btg (Rp) (Rp)

26 Stand / kaki banskrup Bh


27 Pipe cuter Pemotong Pipa) 2" Bh
28 Pipe cuter Pemotong Pipa) 4" Bh
29 Gagang Gergaji Besi Bh
30 Anak Gergaji Besi Bh
31 Selotip Bh
32 Menie Besi Kg

Keterangan : Harga yang dimaksud adalah


harga toko diluar ongkos angkut

…………………………….., …………………………………….2014

Disurvei Oleh Pimpinan………………………..

(.................................................) ( )
Perhitungan RAB : Bendahara Desa :

Harga Satuan PPN PPh Harga Dalam PPN PPh Harga Sat. 2,000,000
Harga Sat. Dalam RAB DPP
Bahan Kwitansi Dalam RAB
10% 1.5% 10% 1.5%
6,000,000 600,000 90,000 6,690,000 6,690,000 6,000,000 600,000 90,000 6,690,000 PPn + PPh Ok

7,500,000 750,000 112,500 8,362,500 8,362,500 7,500,000 750,000 112,500 8,362,500 PPn + PPh Ok

1,750,000 175,000 1,925,000 1,925,000 1,750,000 175,000 1,925,000 PPN Ok

11,250,000 1,125,000 168,750 12,543,750 12,543,750 11,250,000 1,125,000 168,750 12,543,750 PPn + PPh Ok

3,010,000 301,000 45,150 3,356,150 3,356,150 3,010,000 301,000 45,150 3,356,150 PPn + PPh Ok

1,200,000 120,000 1,320,000 1,320,000 1,200,000 120,000 1,320,000 PPN Ok

1,450,000 145,000 1,595,000 1,595,000 1,450,000 145,000 1,595,000 PPN Ok


REKAPITULASI ANGGARAN BIAYA

Propinsi : Nusa Tenggara Timur Kegiatan : Pemb. Polindes


Kabupaten : Flores Timur Ukuran :
Kecamatan : ………………………. No. RAB : 14
Desa : ……………………….

Kegiatan : Pemb. Polindes


Ukuran : 0
No URAIAN Bobot %
Jumlah :
No RAB : 01
Dana Desa Swadaya
I BAHAN 194,459,600 - 73.26
( tidak perlu dirinci )
II PERALATAN 6,032,000### 502,000 2.27
( tidak perlu dirinci )
III UPAH 50,862,000### - 19.16
( tidak perlu dirinci )
III LAIN - LAIN 800,000### - 0.30
( tidak perlu dirinci )
Jumlah 252,153,600
IV Ops TPK (2%) 5,308,000 2.00
V OPS Tim Perencana (3%) 7,963,000 3.00
Jumlah total 265,424,600

Grand Total 265,424,600 100.00


Jumlah Biaya Upah 50,862,000
Jumlah OH Konstruksi HOK

llllllllllllllllllllllllllllllllllllll
RENCANA ANGGARAN BIAYA

DESA WAIWURING KECAMATAN WITIHAMA


TAHUN ANGGARAN 2017

1.    Bidang : 2.2. Pembangunan Desa


2.    Kegiatan : 2.2.6. Pembangunan Gedung Polindes
3.    Waktu Pelaksanaan : 60 Hari Kerja

Rincian Pendanaan : Dana Desa Rp 265,424,600

HARGA
JUMLAH
NO. URAIAN VOLUME SATUAN SATUAN
(Rp.) (Rp.)
1 2 3 4 5 6=3 x5
I. BELANJA BARANG & JASA
1 Upah Tenaga Kerja 1 Borongan 50,862,000 50,862,000
2 Ops. TPK 1 Ls 5,308,000 5,308,000
3 Ops. Tim Perencana 1 Ls 7,963,000 7,963,000
4 Alat:
- Sekop 6 Bh 78,000 468,000
- Ember Coor 5 Bh 17,000 85,000
- Ember Campuran 5 Bh 28,000 140,000
- Profil Tank 2200 Ltr 1 Bh 4,237,000 4,237,000
- Kuas biasa 4'' 5 Bh 17,000 85,000
- Kuas biasa 3'' 3 Bh 13,000 39,000
- Kuas biasa 2'' 2 Bh 11,000 22,000
- Kuas roll 3 Bh 39,000 117,000
- Terpal 4 x 6 1 Bh 201,000 201,000
- Benang Nilon 4 Roll 20,000 80,000
- Kawat Ayak 4 m 28,000 112,000
- Gerobak Dorong 1 Bh 446,000 446,000

II. BELANJA MODAL


1 MATERIAL LOKAL
- Pasir pasang 42 M3 229,000 9,618,000
- Pasir urug 8 M3 229,000 1,832,000
- Tanah urug 26 M3 171,000 4,446,000
- Batu Pasang 22 M3 231,000 5,082,000
- Kerikil uk. 2/3 5 M3 567,000 2,835,000
- Batu Bata 17,555 Bh 1,000 17,555,000
- Air Kerja 3 Tengki 350,000 1,050,000

2 MATERIAL LOKAL KAYU


a Jenis Kayu
- Papan 3/20-4 kls III bowplank 15 Lbr 55,000 825,000
- Kayu 5/7-4 kls II 61 Btg 44,600 2,720,600
- Kayu Kuda2 6/12 klas II 35 Btg 215,000 7,525,000
- Papan jepit 4/12 15 Lbr 139,000 2,085,000
- Balok kayu 5/10 klas II 85 Btg 156,000 13,260,000
- Papan klas II 3/25/4 (listplank) 36 Lbr 139,000 5,004,000
- Usuk kayu 4/6 klas II (r. Plafond) 3 Btg 39,000 117,000
- List plafond kayu profil 73 m' 11,000 803,000

b Pintu dan Jendela


- Daun Pintu (P1) 2 Lbr 1,784,000 3,568,000
- Daun Pintu (P2) 1 Lbr 1,951,000 1,951,000
- Daun Pintu (P3) 6 Lbr 1,951,000 11,706,000
- Daun Pintu (P4) 3 Lbr 1,784,000 5,352,000
- Daun Jendela (J1) 2 Lbr 390,000 780,000
- Daun Jendela (J2) 6 Lbr 390,000 2,340,000
- Kusen P1 2 Bh 500,000 1,000,000
- Kusen P2 1 Bh 500,000 500,000
- Kusen P3 6 Bh 500,000 3,000,000
- Kusen P4 3 Bh 500,000 1,500,000
- Bouvent Batu Roster 35 Bh 22,000 770,000
- Engsel pintu 36 Bh 33,000 1,188,000
- Engsel Jendela 28 Bh 22,000 616,000
- Kunci pintu tanam 11 Bh 134,000 1,474,000
- Kait angin 28 Bh 17,000 476,000
- Grendel jendela 14 Bh 17,000 238,000
- Grendel Pintu 12 Bh 17,000 204,000

c Meubeler
- Tempat Tidur 2 Bh 1,338,000 2,676,000
- Lemari Arsip 1 Bh 836,000 836,000
- Lemari Obat 1 Bh 836,000 836,000
- Meja 1/2 Biro 2 Bh 1,394,000 2,788,000
- Kursi Kayu 8 Bh 279,000 2,232,000
- Bangku Kayu 2 Bh 335,000 670,000
- Kursi Pelastik 0 Bh - -

3 MATERIAL NON LOKAL


Semen 40 kg Bozowa 264 Zak 66,000 17,424,000
Besi polos D 12 mm 110 Staff 101,000 11,110,000
Kawat beton 20 Kg 28,000 560,000
Besi polos D 6 mm 72 Staff 52,000 3,744,000
Seng Gel. BJLS 0,30 149 Lbr 78,000 11,622,000
Paku seng 7 Kg 31,000 217,000
Seng plat 0,30 30 M 22,000 660,000
Paku 12 (Paku Putih) 1 Kg 22,000 22,000
Paku 12 biasa 15 Kg 22,000 330,000
Paku 10 biasa 1 Kg 22,000 22,000
Paku 7-10 Cm 34 Kg 22,000 748,000
Plat U Strip 4 - 60 cm 3 Bh 17,000 51,000
Plat Strip 4 - 20 cm 6 Bh 17,000 102,000
Beugel U bulat 3 - 60 cm 6 Bh 17,000 102,000
Mor Baut ø 3/8 - 10 cm 18 Bh 11,000 198,000
Mor Baut ø 3/8 - 12 cm 18 Bh 11,000 198,000
Mor Baut ø 3/8 - 25 cm 12 Bh 11,000 132,000
Ring/Cinci Baut 96 Bh 1,000 96,000
Paku 7 cm 18 Kg 22,000 396,000
Keramik 40x40 cm 83 Dos 106,000 8,798,000
Semen warna 3 Kg 22,000 66,000
Keramik 15x20 cm 0 Dos - -
Keramik lantai WC 15x20 cm 0 Dos - -
Plywood 3 mm 56 Lbr 106,000 5,936,000
Playwood 9 mm u/ Begesting Kolom 3 Lbr 134,000 402,000
Paku tripleks 5 Kg 28,000 140,000
Cat seng (biru laut) @5 Kg 9 Ember 67,000 603,000
Cat plafond (Putih) @20 Kg 2 Ember 134,000 268,000
Cat dinding (kuning telur) @20 Kg 7 Ember 134,000 938,000
Cat listplank (Coklat Tua) @5kg 4 Kg 67,000 268,000
Cat listplafond (Coklat Tua) @1 Kg 4 Kg 67,000 268,000
Cat Kayu (Coklat Tua) 3 Kg 67,000 201,000
Cat Kaki dinding (merah hati) @1 Kg 10 Kg 67,000 670,000
Cat Dasar 2 Kg 28,000 56,000
Minyak Cat 13 Ltr 28,000 364,000
Pipa PVC Ø 4'' 3 Btg 240,000 720,000
Knee PVC 4'' 135° 3 Bh 22,000 66,000
Elbow PVC 4'' 3 Bh 22,000 66,000
Pipa PVC Ø 2'' 2 Btg 134,000 268,000
Knee PVC 2'' 135° 2 Bh 22,000 44,000
Lem Paralon 3 Bh 6,000 18,000
Socket PVC Ø 4" 3 Bh 11,000 33,000
Socket PVC Ø 2" 3 Bh 11,000 33,000
Pipa Penguras 3 Bh 22,000 66,000
Pipa Hawa 1 Bh 28,000 28,000
Kloset Jongkok 3 Bh 134,000 402,000
Floor Drain 3 Bh 6,000 18,000

4 INSTALASI LISTRIK
Instalasi Listrik 900 watt 1 Ls 2,788,000 2,788,000
Neon (Philips) 18 Watt 15 Bh 78,000 1,170,000
Fiting Lampu 15 Bh 17,000 255,000
Saklar Ganda 5 Bh 22,000 110,000
Saklar Tunggal 4 Bh 17,000 68,000
Stop Kontak Lengkap 8 Bh 17,000 136,000

5 LAIN - LAIN
Papan Nama Proyek 1 Ls 100,000 100,000
Prasasti 1 Bh 700,000 700,000
-
JUMLAH (Rp.) 265,424,600
llllllllllllllllllllllllllllllllllllll
DANA DESA 2017

REKAPITULASI PER
Provinsi : NTT
Kabupaten : Flores Timur
Kecamatan : Witihama
Desa : Waiwuring

NO. BAHAN/ALAT VOLUME SATUAN


I. MATERIAL LOKAL
1 Pasir pasang 42 M3
2 Pasir urug 8 M3
3 Tanah urug 26 M3
4 Batu Pasang 22 M3
5 Kerikil uk. 2/3 5 M3
6 Batu Bata 17,555 Bh

II. MATERIAL NON LOKAL


III. UPAH
No UPAH Volume Sat
1 Tukang 29
2 Pekerja 142
JUMLAH

Disetujui
Kepala Desa Riangduli

SILVIANUS LEGO OLA


REKAPITULASI PERHITUNGAN PAJAK
Jenis Kegiatan : Pemb. Polindes
Lokasi : Ds. Waiwuring

JUMLAH PAJAK JUMLAH


GALIAN C 20% PPN 10% PPh 1,5%
GALIAN C 20% PPN 10%

-
-
-
-
-
-
Pajak 5%
4,000
2,500
JUMLAH - -

llllllllllllllllllllllllllllllllllll

Disetujui Tim Pelaksana Kegiatan


epala Desa Riangduli Desa Riangduli

LVIANUS LEGO OLA MARLINDA INA R. BAHY


b. Polindes
Waiwuring

JUMLAH PAJAK
PPh 1,5%

-
-
-
-
-
-
Total
116,000.00
355,000.00
471,000.00